  1. Proceedings of the workshop on better nuclear plant maintenance: improving human and organisational performance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-05

    A significant proportion of nuclear plant events is attributable to failures that take place during maintenance and periodic testing. Human and organisational factors are frequently identified as making a major contribution to these events. Despite this recognition, licensee and regulatory oversight in the human and organisational area has tended to focus more on operational matters than maintenance. Owing to the importance of human and organisational performance on nuclear plant maintenance, the CSNI Special Experts' Group on Human and Organisational Factors (SEGHOF) hosted a workshop entitled 'Better nuclear plant maintenance: improving human and organisational performance'. The workshop provided an international forum for staff from nuclear plants, research bodies, and regulators to discuss human and organisational challenges to maintenance, and initiatives to support effective performance. Over 60 participants from about 20 countries participated. The workshop was divided into five sessions: 1) International guidance to improve maintenance performance; 2) Lessons learned through maintenance operating experience; 3) Licensee initiatives to support reliable maintenance; 4) Regulatory approaches to assuring effective licensee maintenance; and 5) Recent trends and their impact on maintenance. Sessions commenced with oral presentations of papers followed by break-out and plenary discussions. Session 4 on regulatory approaches included short presentations from ten regulatory bodies and was followed by discussion comparing these approaches. The main findings of the workshop concern: the retirements of experienced staff; the increasing use of contractors to perform maintenance activities; the use of skill-broadening in maintenance; the role of supervisors at the plant level; the organisational changes that are used to optimise the use of plant staff resources; the effective planning of maintenance tasks; the time allowed to complete maintenance tasks; the development

  2. Improving human performance in maintenance personnel

    International Nuclear Information System (INIS)

    Gonzalez Anez, Francisco; Agueero Agueero, Jorge

    2010-01-01

    The continuous evolution and improvement of safety-related processes has included the analysis, design and development of training plans for the qualification of maintenance nuclear power plant personnel. In this respect, the international references in this area recommend the establishment of systematic qualification programmes for personnel performing functions or carrying out safety related tasks. Maintenance personnel qualification processes have improved significantly, and training plans have been designed and developed based on Systematic Approach to Training methodology to each job position. These improvements have been clearly reflected in recent training programmes with new training material and training facilities focused not only on developing technical knowledge and skills but also on improving attitudes and safety culture. The objectives of maintenance training facilities such as laboratories, mock-ups real an virtual, hydraulic loops, field simulators and other training material to be used in the maintenance training centre are to cover training necessities for initial and continuous qualification. Evidently, all these improvements made in the qualification of plant personnel should be extended to include supplemental personnel (external or contracted) performing safety-related tasks. The supplemental personnel constitute a very spread group, covering the performance of multiple activities entailing different levels of responsibility. Some of these activities are performed permanently at the plant, while others are occasional or sporadic. In order to establish qualification requirements for these supplemental workers, it is recommended to establish a rigorous analysis of job positions and tasks. The objective will be to identify the qualification requirements to assure competence and safety. (authors)

  3. Latent human error analysis and efficient improvement strategies by fuzzy TOPSIS in aviation maintenance tasks.

    Science.gov (United States)

    Chiu, Ming-Chuan; Hsieh, Min-Chih

    2016-05-01

    The purposes of this study were to develop a latent human error analysis process, to explore the factors of latent human error in aviation maintenance tasks, and to provide an efficient improvement strategy for addressing those errors. First, we used HFACS and RCA to define the error factors related to aviation maintenance tasks. Fuzzy TOPSIS with four criteria was applied to evaluate the error factors. Results show that 1) adverse physiological states, 2) physical/mental limitations, and 3) coordination, communication, and planning are the factors related to airline maintenance tasks that could be addressed easily and efficiently. This research establishes a new analytic process for investigating latent human error and provides a strategy for analyzing human error using fuzzy TOPSIS. Our analysis process complements shortages in existing methodologies by incorporating improvement efficiency, and it enhances the depth and broadness of human error analysis methodology. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  4. Human factors interventions to reduce human errors and improve productivity in maintenance tasks

    International Nuclear Information System (INIS)

    Isoda, Hachiro; Yasutake, J.Y.

    1992-01-01

    This paper describes work in progress to develop interventions to reduce human errors and increase maintenance productivity in nuclear power plants. The effort is part of a two-phased Human Factors research program being conducted jointly by the Central Research Institute of Electric Power Industry (CRIEPI) in Japan and the Electric Power Research Institute (EPRI) in the United States. The overall objective of this joint research program is to identify critical maintenance tasks and to develop, implement and evaluate interventions which have high potential for reducing human errors or increasing maintenance productivity. As a result of the Phase 1 effort, ten critical maintenance tasks were identified. For these tasks, over 25 candidate interventions were identified for potential development. After careful analysis, seven interventions were selected for development during Phase 2. This paper describes the methodology used to analyze and identify the most critical tasks, the process of identifying and developing selected interventions and some of the initial results. (author)

  5. The contributions of human factors on human error in Malaysia aviation maintenance industries

    Science.gov (United States)

    Padil, H.; Said, M. N.; Azizan, A.

    2018-05-01

    Aviation maintenance is a multitasking activity in which individuals perform varied tasks under constant pressure to meet deadlines as well as challenging work conditions. These situational characteristics combined with human factors can lead to various types of human related errors. The primary objective of this research is to develop a structural relationship model that incorporates human factors, organizational factors, and their impact on human errors in aviation maintenance. Towards that end, a questionnaire was developed which was administered to Malaysian aviation maintenance professionals. Structural Equation Modelling (SEM) approach was used in this study utilizing AMOS software. Results showed that there were a significant relationship of human factors on human errors and were tested in the model. Human factors had a partial effect on organizational factors while organizational factors had a direct and positive impact on human errors. It was also revealed that organizational factors contributed to human errors when coupled with human factors construct. This study has contributed to the advancement of knowledge on human factors effecting safety and has provided guidelines for improving human factors performance relating to aviation maintenance activities and could be used as a reference for improving safety performance in the Malaysian aviation maintenance companies.

  6. Maintenance improvement program

    International Nuclear Information System (INIS)

    Derbonne, D.R.; Plunkett, T.F.; Simpson, J.R.

    1989-01-01

    During fuel cycle 1 at River Bend station, considerable effort was expended to reduce corrective maintenance work orders (MWOs) to <1,000. This was done by complementing the plant staff with costly contract personnel. Coming out of the first refueling outage, most contract personnel were released. The change in MWO backlog started a steady rise. It became readily apparent that to avoid costly contract staff time, a maintenance improvement program (MIP) was necessary. The MIP Was primarily directed at two areas: crew efficiency improvements and improved preplanned MWO packages. The overall effect of the MIP was to achieve significant productivity improvements with reduced operation and maintenance cost by providing frequent accountability to all levels of maintenance supervision. The MIP also produced a feeling of pride among the maintenance department employees that had not really existed before. This was the best benefit of all

  7. A human factors approach to effective maintenance

    International Nuclear Information System (INIS)

    Penington, J.; Shakeri, S.

    2006-01-01

    Traditionally in the field of Human Factors within the nuclear industry, the focus has been to identify the potential for human errors in operating tasks, and develop strategies to prevent their occurrence, provide recovery mechanisms, and mitigate the consequences of error as appropriate. Past experience has demonstrated however a significant number of human errors within the nuclear industry occur during maintenance tasks. It is for this reason, and the fact that our nuclear power plants are ageing and increasingly in need of maintenance, that the industry must pay more attention to maintenance tasks. The purpose of this paper is to present a framework for effective maintenance programs, and based upon this framework discuss an approach (an audit tool) that can be used to both design such a program, and to assess existing programs. In addition, this tool can form the basis of cost benefit decisions relating to priorities for improvements to existing programs. (author)

  8. The human factor in maintenance work

    International Nuclear Information System (INIS)

    Hansson, B.

    1996-01-01

    In most of the maintenance works performed at operating plants, the personnel is the warranty for both efficient performance and good quality. To reach the right quality level in performance, the personnel needs adequate tools and of course a maintenance strategy and an organisation that supports the efficient work. The human factor is mostly referred to when something went wrong and analyses are done. There is a great potential of doing preventive analysis. The presentation will focus on experience in this field and what has been done at Barsebaeck NPP to analyse and improve the maintenance work. As maintenance work can't be seen as an isolated area, the rest of the plant organisation is included in the presentation. (author) figs., tabs

  9. Human errors related to maintenance and modifications

    International Nuclear Information System (INIS)

    Laakso, K.; Pyy, P.; Reiman, L.

    1998-01-01

    about weakness in audits made by the operating organisation and in tests relating to plant operation. The number of plant-specific maintenance records used as input material was high and the findings were discussed thoroughly with the plant maintenance personnel. The results indicated that instrumentation is more prone to human error than the rest of maintenance. Most errors stem from refuelling outage periods and about a half of them were identified during the same outage they were committed. Plant modifications are a significant source of common cause failures. The number of dependent errors could be reduced by improved co-ordination and auditing, post-installation checking, training and start-up testing programmes. (orig.)

  10. Identification of the human factors contributing to maintenance failures in a petroleum operation.

    Science.gov (United States)

    Antonovsky, Ari; Pollock, Clare; Straker, Leon

    2014-03-01

    This research aimed to identify the most frequently occurring human factors contributing to maintenance-related failures within a petroleum industry organization. Commonality between failures will assist in understanding reliability in maintenance processes, thereby preventing accidents in high-hazard domains. Methods exist for understanding the human factors contributing to accidents. Their application in a maintenance context mainly has been advanced in aviation and nuclear power. Maintenance in the petroleum industry provides a different context for investigating the role that human factors play in influencing outcomes. It is therefore worth investigating the contributing human factors to improve our understanding of both human factors in reliability and the factors specific to this domain. Detailed analyses were conducted of maintenance-related failures (N = 38) in a petroleum company using structured interviews with maintenance technicians. The interview structure was based on the Human Factor Investigation Tool (HFIT), which in turn was based on Rasmussen's model of human malfunction. A mean of 9.5 factors per incident was identified across the cases investigated.The three most frequent human factors contributing to the maintenance failures were found to be assumption (79% of cases), design and maintenance (71%), and communication (66%). HFIT proved to be a useful instrument for identifying the pattern of human factors that recurred most frequently in maintenance-related failures. The high frequency of failures attributed to assumptions and communication demonstrated the importance of problem-solving abilities and organizational communication in a domain where maintenance personnel have a high degree of autonomy and a wide geographical distribution.

  11. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  12. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    OpenAIRE

    Orlando Duran; Andrea Capaldo; Paulo Andrés Duran Acevedo

    2017-01-01

    Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despi...

  13. Maintenance performance improvement with System Dynamics : A Corrective Maintenance showcase

    NARCIS (Netherlands)

    Deenen, R.E.M.; Van Daalen, C.E.; Koene, E.G.C.

    2008-01-01

    This paper presents a case study of an analysis of a Corrective Maintenance process to realize performance improvement. The Corrective Maintenance process is supported by SAP, which has indicated the performance realisation problem. System Dynamics is used in a Group Model Building process to

  14. Human cognitive task distribution model for maintenance support system of a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Young Ho

    2007-02-15

    In human factors research, more attention has been devoted to the operation of nuclear power plants (NPPs) than to their maintenance. However, human error related to maintenance is 45% among the total human errors from 1990 to 2005 in Korean nuclear power plants. Therefore, it is necessary to study human factors in the maintenance of an NPP. There is a current trend toward introducing digital technology into both safety and non-safety systems in NPPs. A variety of information about plant conditions can be used digitally. In the future, maintenance support systems will be developed based on an information-oriented NPP. In this context, it is necessary to study the cognitive tasks of the personnel involved in maintenance and the interaction between the personnel and maintenance support systems. The fundamental purpose of this work is how to distribute the cognitive tasks of the personnel involved in the maintenance in order to develop a maintenance support system that considers human factors. The second purpose is to find the causes of errors due to engineers or maintainers and propose system functions that are countermeasures to reduce these errors. In this paper, a cognitive task distribution model of the personnel involved in maintenance is proposed using Rasmussen's decision making model. First, the personnel were divided into three groups: the operators (inspectors), engineers, and maintainers. Second, human cognitive tasks related to maintenance were distributed based on these groups. The operators' cognitive tasks are detection and observation; the engineers' cognitive tasks are identification, evaluation, target state, select target, and procedure: and the maintainers' cognitive task is execution. The case study is an analysis of failure reports related to human error in maintenance over a period of 15years. By using error classification based on the information processing approach, the human errors involved in maintenance were classified

  15. Human cognitive task distribution model for maintenance support system of a nuclear power plant

    International Nuclear Information System (INIS)

    Park, Young Ho

    2007-02-01

    In human factors research, more attention has been devoted to the operation of nuclear power plants (NPPs) than to their maintenance. However, human error related to maintenance is 45% among the total human errors from 1990 to 2005 in Korean nuclear power plants. Therefore, it is necessary to study human factors in the maintenance of an NPP. There is a current trend toward introducing digital technology into both safety and non-safety systems in NPPs. A variety of information about plant conditions can be used digitally. In the future, maintenance support systems will be developed based on an information-oriented NPP. In this context, it is necessary to study the cognitive tasks of the personnel involved in maintenance and the interaction between the personnel and maintenance support systems. The fundamental purpose of this work is how to distribute the cognitive tasks of the personnel involved in the maintenance in order to develop a maintenance support system that considers human factors. The second purpose is to find the causes of errors due to engineers or maintainers and propose system functions that are countermeasures to reduce these errors. In this paper, a cognitive task distribution model of the personnel involved in maintenance is proposed using Rasmussen's decision making model. First, the personnel were divided into three groups: the operators (inspectors), engineers, and maintainers. Second, human cognitive tasks related to maintenance were distributed based on these groups. The operators' cognitive tasks are detection and observation; the engineers' cognitive tasks are identification, evaluation, target state, select target, and procedure: and the maintainers' cognitive task is execution. The case study is an analysis of failure reports related to human error in maintenance over a period of 15years. By using error classification based on the information processing approach, the human errors involved in maintenance were classified

  16. Maintenance modeling and optimization integrating human and material resources

    International Nuclear Information System (INIS)

    Martorell, S.; Villamizar, M.; Carlos, S.; Sanchez, A.

    2010-01-01

    Maintenance planning is a subject of concern to many industrial sectors as plant safety and business depend on it. Traditionally, the maintenance planning is formulated in terms of a multi-objective optimization (MOP) problem where reliability, availability, maintainability and cost (RAM+C) act as decision criteria and maintenance strategies (i.e. maintenance tasks intervals) act as the only decision variables. However the appropriate development of each maintenance strategy depends not only on the maintenance intervals but also on the resources (human and material) available to implement such strategies. Thus, the effect of the necessary resources on RAM+C needs to be modeled and accounted for in formulating the MOP affecting the set of objectives and constraints. In this paper RAM+C models to explicitly address the effect of human resources and material resources (spare parts) on RAM+C criteria are proposed. This extended model allows accounting for explicitly how the above decision criteria depends on the basic model parameters representing the type of strategies, maintenance intervals, durations, human resources and material resources. Finally, an application case is performed to optimize the maintenance plan of a motor-driven pump equipment considering as decision variables maintenance and test intervals and human and material resources.

  17. Maintenance modeling and optimization integrating human and material resources

    Energy Technology Data Exchange (ETDEWEB)

    Martorell, S., E-mail: smartore@iqn.upv.e [Dpto. Ingenieria Quimica y Nuclear, Universidad Politecnica Valencia (Spain); Villamizar, M.; Carlos, S. [Dpto. Ingenieria Quimica y Nuclear, Universidad Politecnica Valencia (Spain); Sanchez, A. [Dpto. Estadistica e Investigacion Operativa Aplicadas y Calidad, Universidad Politecnica Valencia (Spain)

    2010-12-15

    Maintenance planning is a subject of concern to many industrial sectors as plant safety and business depend on it. Traditionally, the maintenance planning is formulated in terms of a multi-objective optimization (MOP) problem where reliability, availability, maintainability and cost (RAM+C) act as decision criteria and maintenance strategies (i.e. maintenance tasks intervals) act as the only decision variables. However the appropriate development of each maintenance strategy depends not only on the maintenance intervals but also on the resources (human and material) available to implement such strategies. Thus, the effect of the necessary resources on RAM+C needs to be modeled and accounted for in formulating the MOP affecting the set of objectives and constraints. In this paper RAM+C models to explicitly address the effect of human resources and material resources (spare parts) on RAM+C criteria are proposed. This extended model allows accounting for explicitly how the above decision criteria depends on the basic model parameters representing the type of strategies, maintenance intervals, durations, human resources and material resources. Finally, an application case is performed to optimize the maintenance plan of a motor-driven pump equipment considering as decision variables maintenance and test intervals and human and material resources.

  18. Software Maintenance Management Evaluation and Continuous Improvement

    CERN Document Server

    April, Alain

    2008-01-01

    This book explores the domain of software maintenance management and provides road maps for improving software maintenance organizations. It describes full maintenance maturity models organized by levels 1, 2, and 3, which allow for benchmarking and continuous improvement paths. Goals for each key practice area are also provided, and the model presented is fully aligned with the architecture and framework of software development maturity models of CMMI and ISO 15504. It is complete with case studies, figures, tables, and graphs.

  19. Analysis of human-in-the-loop tele-operated maintenance inspection tasks using VR

    International Nuclear Information System (INIS)

    Boessenkool, H.; Abbink, D.A.; Heemskerk, C.J.M.; Steinbuch, M.; Baar, M.R. de; Wildenbeest, J.G.W.; Ronden, D.; Koning, J.F.

    2013-01-01

    Highlights: ► Execution of tele-operated inspection tasks for ITER maintenance was analyzed. ► Human factors experiments using Virtual Reality showed to be a valuable approach. ► A large variation in time performance and number of collisions was found. ► Results indicate significant room for improvement for teleoperated free space tasks. ► A promising solution is haptic shared control: assist operator with guiding forces. -- Abstract: One of the challenges in future fusion plants such as ITER is the remote maintenance of the plant. Foreseen human-in-the-loop tele-operation is characterized by limited visual and haptic feedback from the environment, which results in degraded task performance and increased operator workload. For improved tele-operated task performance it is required to get insight in the expected tasks and problems during maintenance at ITER. By means of an exploratory human factor experiment, this paper analyses problems and bottlenecks during the execution of foreseen tele-operated maintenance at ITER, identifying most promising areas of improvement. The focus of this paper is on free space (sub)tasks where contact with the environment needs to be avoided. A group of 5 subjects was asked to carry-out an ITER related free space task (visual inspection), using a six degree of freedom master device connected to a simulated hot cell environment. The results show large variation in time performance between subjects and an increasing number of collisions for more difficult tasks, indicating room for improvement for free space (sub)tasks. The results will be used in future research on the haptic guidance strategies in the ITER Remote Handling framework

  20. Analysis of human-in-the-loop tele-operated maintenance inspection tasks using VR

    Energy Technology Data Exchange (ETDEWEB)

    Boessenkool, H., E-mail: h.boessenkool@differ.nl [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Eindhoven University of Technology, Department of Mechanical Engineering, Dynamics and Control Group, PO Box 513, 5600 MB Eindhoven (Netherlands); Abbink, D.A. [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands); Steinbuch, M. [Eindhoven University of Technology, Department of Mechanical Engineering, Dynamics and Control Group, PO Box 513, 5600 MB Eindhoven (Netherlands); Baar, M.R. de [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Eindhoven University of Technology, Department of Mechanical Engineering, Dynamics and Control Group, PO Box 513, 5600 MB Eindhoven (Netherlands); Wildenbeest, J.G.W. [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands); Ronden, D. [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Koning, J.F. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands)

    2013-10-15

    Highlights: ► Execution of tele-operated inspection tasks for ITER maintenance was analyzed. ► Human factors experiments using Virtual Reality showed to be a valuable approach. ► A large variation in time performance and number of collisions was found. ► Results indicate significant room for improvement for teleoperated free space tasks. ► A promising solution is haptic shared control: assist operator with guiding forces. -- Abstract: One of the challenges in future fusion plants such as ITER is the remote maintenance of the plant. Foreseen human-in-the-loop tele-operation is characterized by limited visual and haptic feedback from the environment, which results in degraded task performance and increased operator workload. For improved tele-operated task performance it is required to get insight in the expected tasks and problems during maintenance at ITER. By means of an exploratory human factor experiment, this paper analyses problems and bottlenecks during the execution of foreseen tele-operated maintenance at ITER, identifying most promising areas of improvement. The focus of this paper is on free space (sub)tasks where contact with the environment needs to be avoided. A group of 5 subjects was asked to carry-out an ITER related free space task (visual inspection), using a six degree of freedom master device connected to a simulated hot cell environment. The results show large variation in time performance between subjects and an increasing number of collisions for more difficult tasks, indicating room for improvement for free space (sub)tasks. The results will be used in future research on the haptic guidance strategies in the ITER Remote Handling framework.

  1. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  2. Human factor analysis and preventive countermeasures of maintenance in nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Li; Hu Chao

    2008-01-01

    Based on the human error analysis theory and the characteristics of maintenance in a nuclear power plant, human factors of maintenance in NPP are divided into three different areas: human, technology, and organization, in which human refers to the individual factors, mainly including psychological quality, physiological characteristic, state of health, knowledge, skill level, and interpersonal relationship. Technology includes the maintenance technology, maintenance strategy, maintenance tool, maintenance interface, maintenance regulation, and work environment. Organization includes task arrangement, information communication, training, personnel external environment, team construction, and leadership. The analysis also reveals that the organization factors, which can indirectly influence personnel performance, are the primary initiators of human error. Based on these, some countermeasures are brought forward in order to reduce human errors. (authors)

  3. Implementing a customer focused continual business improvement program to improve the maintenance process

    International Nuclear Information System (INIS)

    Kharshafdjian, G.; Fisher, C.; Beres, T.; Brooks, S.; Forbes, S.; Krause, M.; McAuley, K.; Wendorf, M.

    2006-01-01

    Global market pressures and increasing competition demands that successful companies establish a continual business improvement program as part of implementing its business strategy. Such programs must be driven by the definition of quality from the customer's perspective. This customer quality focus often requires a change in all aspects of the business including products, services, processes and culture. This paper will describe how Atomic Energy of Canada Limited implemented a Continual Business Improvement Program in their Nuclear Laboratories Business Unit. In particular, to review how the techniques were applied to improve the maintenance process and the status of the project. Customer (internal users of the processes at CRL) feedback has shown repeatedly there is dissatisfaction of the maintenance process. Customers complain about jobs not getting done to schedule or being deferred. A project has been launched with the following goals: to improve the maintenance process customer satisfaction and increase trades wrench time by 30 minutes / trade / day. DMAIC (Define-Measure-Analyze-Improve-Control) methodology was applied to find out the Root Cause(s) of the problem, provide solutions, and implement improvements. The expected Operational Benefits include: Executing work efficiently to quality standards and business performance of the site, improve maintenance efficiencies, reduce cycle time for maintenance process and improve process yield, and improve customer and employee satisfaction. (author)

  4. Implementing a customer focused continual business improvement program to improve the maintenance process

    Energy Technology Data Exchange (ETDEWEB)

    Kharshafdjian, G.; Fisher, C.; Beres, T.; Brooks, S.; Forbes, S.; Krause, M.; McAuley, K.; Wendorf, M. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada)

    2006-07-01

    Global market pressures and increasing competition demands that successful companies establish a continual business improvement program as part of implementing its business strategy. Such programs must be driven by the definition of quality from the customer's perspective. This customer quality focus often requires a change in all aspects of the business including products, services, processes and culture. This paper will describe how Atomic Energy of Canada Limited implemented a Continual Business Improvement Program in their Nuclear Laboratories Business Unit. In particular, to review how the techniques were applied to improve the maintenance process and the status of the project. Customer (internal users of the processes at CRL) feedback has shown repeatedly there is dissatisfaction of the maintenance process. Customers complain about jobs not getting done to schedule or being deferred. A project has been launched with the following goals: to improve the maintenance process customer satisfaction and increase trades wrench time by 30 minutes / trade / day. DMAIC (Define-Measure-Analyze-Improve-Control) methodology was applied to find out the Root Cause(s) of the problem, provide solutions, and implement improvements. The expected Operational Benefits include: Executing work efficiently to quality standards and business performance of the site, improve maintenance efficiencies, reduce cycle time for maintenance process and improve process yield, and improve customer and employee satisfaction. (author)

  5. Basic study of the plant maintenance model considering plant improvement/modification

    International Nuclear Information System (INIS)

    Tsumaya, Akira; Inoue, Kazuya; Mochizuki, Masahito; Wakamatsu, Hidefumi; Arai, Eiji

    2007-01-01

    This paper proposes a maintenance activity model that considers not only routine maintenance activity but also functional maintenance including improvement/modification. Required maintenance types are categorized, and limitation of Activity Domain Integration Diagram (ADID) proposed by ISO18435 are discussed based on framework for life cycle maintenance management of manufacturing assets. Then, we proposed extension ADID model for plant maintenance activity model considering functional improvement/modification. (author)

  6. A study on human performance enhancement plan in maintenance field by survey on actual condition of human performance tools - 15035

    International Nuclear Information System (INIS)

    Park, J.; Jeong, H.; Kim, Y.

    2015-01-01

    Human errors in nuclear power plant are one of the important factors that may cause reactor trip. Most operating companies of nuclear power plants manage human factor systematically through tools like HPES (Human Performance Enhancement), PSR (Periodic Safety Review), OE (Operating Experience), human performance tools, safety culture assessment and CAP (Corrective Action Program). But human factors are managed passively in maintenance field, because maintenance works are carrying out by partner companies. KHNP also contracts the maintenance work to the partner companies, and advise them to use human performance tools. But the actual condition on partner companies has not been surveyed. This paper suggests some plans that can improve human performance by analyzing the opinion of partner company employees about the causes and solutions of human errors, by analyzing utilization of human performance tools and by comparing the results of the partner companies survey with the results of the operating company survey. The survey is conducted to 3 partner companies by similar contents and categories in order to compare partner company with operating company, and the main analysis fields are the following: -1) Level of understanding and utilization of the human performance tools, -2) Difficulties of applying the human performance tools, -3) Level of employee's training (or education) in the use of the human performance tools, and -4) Root causes of human errors and countermeasures. (authors)

  7. Cloud Computing for Maintenance Performance Improvement

    OpenAIRE

    Kour, Ravdeep; Karim, Ramin; Parida, Aditya

    2013-01-01

    Cloud Computing is an emerging research area. It can be utilised for acquiring an effective and efficient information logistics. This paper uses cloud-based technology for the establishment of information logistics for railway system which requires information based on data from different data sources (e.g. railway maintenance, railway operation, and railway business data). In order to improve the performance of the maintenance process relevant data from various sources need to be acquired, f...

  8. Research on operation and maintenance support system adaptive to human recognition and understanding in human-centered plant

    International Nuclear Information System (INIS)

    Numano, Masayoshi; Matsuoka, Takeshi; Mitomo, N.

    2004-01-01

    As a human-centered plant, advanced nuclear power plant needs appropriate role sharing between human and mobile intelligent agents. Human-machine cooperation for plant operation and maintenance activities is also required with an advanced interface. Plant's maintenance is programmed using mobile robots working under the radiation environments instead of human beings. Operation and maintenance support system adaptive to human recognition and understanding should be developed to establish adequate human and machine interface so as to induce human capabilities to the full and enable human to take responsibility for plan's operation. Plant's operation and maintenance can be cooperative activities between human and intelligent automonous agents having surveillance and control functions. Infrastructure of multi-agent simulation system for the support system has been investigated and developed based on work plans derived from the scheduler. (T. Tanaka)

  9. An analysis of human maintenance failures of a nuclear power plant

    International Nuclear Information System (INIS)

    Pyy, P.

    2000-01-01

    In the report, a study of faults caused by maintenance activities is presented. The objective of the study was to draw conclusions on the unplanned effects of maintenance on nuclear power plant safety and system availability. More than 4400 maintenance history reports from the years 1992-1994 of Olkiluoto BWR nuclear power plant (NPP) were analysed together with the maintenance personnel. The human action induced faults were classified, e.g., according to their multiplicity and effects. This paper presents and discusses the results of a statistical analysis of the data. Instrumentation and electrical components appeared to be especially prone to human failures. Many human failures were found in safety related systems. Several failures also remained latent from outages to power operation. However, the safety significance of failures was generally small. Modifications were an important source of multiple human failures. Plant maintenance data is a good source of human reliability data and it should be used more in the future. (orig.)

  10. Statistical analysis of human maintenance failures of a nuclear power plant

    International Nuclear Information System (INIS)

    Pyy, P.

    2000-01-01

    In this paper, a statistical study of faults caused by maintenance activities is presented. The objective of the study was to draw conclusions on the unplanned effects of maintenance on nuclear power plant safety and system availability. More than 4400 maintenance history reports from the years 1992-1994 of Olkiluoto BWR nuclear power plant (NPP) were analysed together with the maintenance personnel. The human action induced faults were classified, e.g., according to their multiplicity and effects. This paper presents and discusses the results of a statistical analysis of the data. Instrumentation and electrical components are especially prone to human failures. Many human failures were found in safety related systems. Similarly, several failures remained latent from outages to power operation. The safety significance was generally small. Modifications are an important source of multiple human failures. Plant maintenance data is a good source of human reliability data and it should be used more, in future. (orig.)

  11. Human Error Probability Assessment During Maintenance Activities of Marine Systems

    Directory of Open Access Journals (Sweden)

    Rabiul Islam

    2018-03-01

    Full Text Available Background: Maintenance operations on-board ships are highly demanding. Maintenance operations are intensive activities requiring high man–machine interactions in challenging and evolving conditions. The evolving conditions are weather conditions, workplace temperature, ship motion, noise and vibration, and workload and stress. For example, extreme weather condition affects seafarers' performance, increasing the chances of error, and, consequently, can cause injuries or fatalities to personnel. An effective human error probability model is required to better manage maintenance on-board ships. The developed model would assist in developing and maintaining effective risk management protocols. Thus, the objective of this study is to develop a human error probability model considering various internal and external factors affecting seafarers' performance. Methods: The human error probability model is developed using probability theory applied to Bayesian network. The model is tested using the data received through the developed questionnaire survey of >200 experienced seafarers with >5 years of experience. The model developed in this study is used to find out the reliability of human performance on particular maintenance activities. Results: The developed methodology is tested on the maintenance of marine engine's cooling water pump for engine department and anchor windlass for deck department. In the considered case studies, human error probabilities are estimated in various scenarios and the results are compared between the scenarios and the different seafarer categories. The results of the case studies for both departments are also compared. Conclusion: The developed model is effective in assessing human error probabilities. These probabilities would get dynamically updated as and when new information is available on changes in either internal (i.e., training, experience, and fatigue or external (i.e., environmental and operational conditions

  12. Human error in maintenance: An investigative study for the factories of the future

    International Nuclear Information System (INIS)

    Dhillon, B S

    2014-01-01

    This paper presents a study of human error in maintenance. Many different aspects of human error in maintenance considered useful for the factories of the future are studied, including facts, figures, and examples; occurrence of maintenance error in equipment life cycle, elements of a maintenance person's time, maintenance environment and the causes for the occurrence of maintenance error, types and typical maintenance errors, common maintainability design errors and useful design guidelines to reduce equipment maintenance errors, maintenance work instructions, and maintenance error analysis methods

  13. Competence within Maintenance

    OpenAIRE

    Nerland, Annette Smørholm

    2010-01-01

    Maintenance can be a contributing factor to unwanted events, as well as desired events and states. Human competence can be defined as the ability to perform a specific task, action or function successfully, and is therefore a key factor to proper execution of maintenance tasks. Hence,maintenance will have negative consequences if done wrong, and give positive results when done right. The purpose of this report is to study the many aspects of maintenance competence. Endeavoring to improve ...

  14. Systematic analysis of dependent human errors from the maintenance history at finnish NPPs - A status report

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K. [VTT Industrial Systems (Finland)

    2002-12-01

    Operating experience has shown missed detection events, where faults have passed inspections and functional tests to operating periods after the maintenance activities during the outage. The causes of these failures have often been complex event sequences, involving human and organisational factors. Especially common cause and other dependent failures of safety systems may significantly contribute to the reactor core damage risk. The topic has been addressed in the Finnish studies of human common cause failures, where experiences on latent human errors have been searched and analysed in detail from the maintenance history. The review of the bulk of the analysis results of the Olkiluoto and Loviisa plant sites shows that the instrumentation and control and electrical equipment is more prone to human error caused failure events than the other maintenance and that plant modifications and also predetermined preventive maintenance are significant sources of common cause failures. Most errors stem from the refuelling and maintenance outage period at the both sites, and less than half of the dependent errors were identified during the same outage. The dependent human errors originating from modifications could be reduced by a more tailored specification and coverage of their start-up testing programs. Improvements could also be achieved by a more case specific planning of the installation inspection and functional testing of complicated maintenance works or work objects of higher plant safety and availability importance. A better use and analysis of condition monitoring information for maintenance steering could also help. The feedback from discussions of the analysis results with plant experts and professionals is still crucial in developing the final conclusions and recommendations that meet the specific development needs at the plants. (au)

  15. Summary of EPRI projects for improving power plant maintenance and maintainability

    International Nuclear Information System (INIS)

    Shugars, H.G.; Poole, D.N.; Pack, R.W.

    1979-01-01

    The Electric Power Research Institute is sponsoring projects to improve power plant maintenance and maintainability. Areas presently being emphasized are improvements in plant design for maintainability, improvements in performing nuclear plant refuelings, and development of on-line monitoring and diagnostic systems for various plant components. The seven projects are reviewed. They are: (1) human factors review of power plant maintainability; (2) refueling outage improvement; (3) on-line monitoring and diagnostics for power plant machinery; (4) acoustic emission and vibrati1on signature analysis of fossil fuel plant components; (5) acoustic monitoring of power plant valves; (6) on-line monitoring and diagnostics for generators; and (7) detection of water induction in steam turbines. Each project contractor and the project manager are listed for reference. 8 references

  16. TRIZ method application for improving the special vehicles maintenance

    OpenAIRE

    Petrović Saša; Lozanović-Šajić Jasmina; Knežević Tijana; Pavlović Jovan; Ivanov Goran

    2014-01-01

    TRIZ methodology provides an opportunity for improving the classical engineering approach based on personal knowledge and experience. This paper presents the application of TRIZ methods for improving vehicle maintenance where special equipment is installed. A specific problem is the maintenance of the periscopes with heating system. Protective glass panels with heating system are rectangular glass elements. Their purpose is to perform mechanical protection ...

  17. A Study on Human Factors in Maintenance of a Nuclear Power Plant (NPP)

    International Nuclear Information System (INIS)

    Park, Young Ho; Seong, Poong Hyun

    2006-01-01

    In human factors research, more attention has been devoted to the operation of a nuclear power plant (NPP) than to their maintenance. However, more NPP incidents are caused by inadequate maintenance rather than by faulty operation. There is a trend in NPP toward introducing digital technology into safety and non-safety systems. This lead to changes of maintenance, and support systems such as diagnosis system, augmentation system and handy terminal will be developed. In this context, it is important to identify tasks of human related to each phase of maintenance and their relation in order to apply those to maintenance. However, there are few researches of human factors in maintenance. This paper studies on framework of cognitive task analysis for developing maintenance support systems

  18. Task analysis of human-in-the-loop tele-operated maintenance: What can be learned from JET?

    International Nuclear Information System (INIS)

    Boessenkool, H.; Thomas, J.; Heemskerk, C.J.M.; Baar, M.R. de; Steinbuch, M.; Abbink, D.A.

    2014-01-01

    Highlights: •Maintenance task execution at JET was analyzed to guide improvements for ITER. •A large variation in task duration was found for various operator experience levels. •Results indicate significant room for improvement for tele-operated performance. •Improvent of visual feedback and artificial guiding forces was considered promising. -- Abstract: Remote maintenance will determine the available uptime of future fusion plants such as ITER. Experience at predecessor JET showed that a human-in-the-loop tele-operated approach is crucial, although this approach entails drawbacks such as the unavoidable extensive operator training and relatively long execution times. These drawbacks are common knowledge, but little quantitative research is available to guide improvements (such as improved training methods, or active operator support systems). The aim of this paper is to identify the key areas for further improvement of tele-operated maintenance. This is achieved by a detailed task analysis based on recent maintenance at JET, using task logbooks and video data as well as interviews with experienced master–slave operators. The resulting task analysis shows the (sub)tasks that were most time-consuming and shows a large variance in time performance within operators, but also substantial differences between qualified operators with different levels of experience. The operator interviews indicate that intuitive (virtual) visual feedback and artificial (guiding) forces are promising directions for improvement. The results found in this study will be used for future research and development activities focusing on haptic guiding strategies, with the aim to further design and optimize RH maintenance systems for ITER and beyond

  19. Maintenance system improvement in cast iron foundry

    Directory of Open Access Journals (Sweden)

    S. Kukla

    2011-07-01

    Full Text Available The work presents the issue of technical equipment management in an iron foundry basing on the assumptions of the TPM system (Total Productive Maintenance. Exploitation analysis of automatic casting lines has been carried out and their work’s influence on the whole production system’s functioning has been researched. Within maintenance system improvement, implementation of autonomic service and planned lines’ review have been proposed in order to minimize the time of breakdown stoppages. The SMED method was used to optimize changeover time, and the OEE (Overall Equipment Effectiveness was applied to evaluate the level of resources usage before and after implementing changes. Further, the influence of the maintenance strategy of casting devices’ efficiency on own costs of casting manufac- ture was estimated.

  20. Applying PPM to ERP Maintenance and Continuous Improvement Initiatives

    DEFF Research Database (Denmark)

    El-Tal, Nada Maria; Fonnesbæk, Majbrit; Kræmmergaard, Pernille

    2006-01-01

    to gain business benefits from the systems. However the ERP literature on how to do this is limited. The purpose of this article is to explore how Project Portfolio Management (PPM) from the Research and Development (R&D) literature can be applied to an ERP second wave context, when companies...... are to prioritize and select maintenance and continuous improvement initiatives. This is done by reviewing the existing literature in the fields of PPM from R&D literature and then by reviewing the existing literature about maintenance and improvement initiatives in the ERP literature, after which the two...... are compared and discussed using three case-studies. The paper contributes with a discussion on how PPM from R&D can be applied to maintenance and continuous improvement initiatives in the second wave of ERP. The paper ends with arguing that emphasis needs to be given to this field, since a conscious...

  1. Human Factors in Aviation Maintenance. Phase 1

    Science.gov (United States)

    1991-11-01

    solution is war- more effe-ctive use of human resoUrecs , the neat step Ls to ane- uassol o efogte.S a hr sn tes te de. Af piot progfctram can...and Subtitle 5. Report Date November 1991 Human Factors in Aviation Maintenance - Phase One Progress Report 6. Perfarng Oon z’on Code i8. Perfo-rrng...Independence Avenue, SW 14. Sponsor,mg Agency Code Washington, DC 20591 15. Supplementary Notes 16. Abstract "• This human factors research in aviation

  2. UNC Nuclear Industries' human-factored approach to the operating or maintenance procedure

    International Nuclear Information System (INIS)

    Nelson, A.A.; Clark, J.E.

    1982-01-01

    The development of Human Factors Engineering (HFE) and UNC Nuclear Industries' (UNC) commitment to minimizing the potential for human error in the performance of operating or maintenance procedures have lead to a procedure upgrade program. Human-factored procedures were developed using information from many sources including, but not limited to, operators, a human factors specialist, engineers and supervisors. This has resulted in the Job Performance Aid (JPA). This paper presents UNC's approach to providing human-factored operating and maintenance procedures

  3. Using systematic aging assessments to improve effectiveness of plant maintenance programs

    International Nuclear Information System (INIS)

    Watson, P.; Yang, J.X.; Dam, R.F.; Nickerson, J.H.

    2003-01-01

    Nuclear plant equipment aging assessment studies provided by AECL include life assessments, condition assessments or systematic assessments of maintenance. AECL has developed several tools to apply the results of aging assessment studies to improve the effectiveness of actual plant maintenance programs. The Systematic Assessment of Maintenance and the SYSTMS tool generate maintenance tasks for a system. The System Maintenance Datastore tool assesses the maintenance resources on a system basis, and can thus quantify the savings realized by optimizing the maintenance program. Long term trends in condition-based maintenance due to component aging can be predicted, and resource savings due to optimum timing of component replacement or general plant refurbishment can be quantified. The System based Adaptive Maintenance Process ensures the maintenance program is continually updated to reflect the latest plant equipment condition and maintenance strategy information. (author)

  4. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  5. IMPROVING THE QUALITY OF MAINTENANCE PROCESSES USING INFORMATION TECHNOLOGY

    Directory of Open Access Journals (Sweden)

    Zora Arsovski

    2008-06-01

    Full Text Available In essence, process of maintaining equipment is a support process, because it indirectly contributes to operational ability of the production process necessary for the supply chain of the new value. Taking into account increased levels of automatization and quality, this proces s becomes more and more significant and for some branches of industry, even crucial. Due to the fact that the quality of the entire process is more and more dependent on the maintenance process, these processes must be carefully designed and effectively im plemented. There are various techniques and approaches at our disposal, such as technical, logistical and intensive application of the information - communication technologies. This last approach is presented in this work. It begins with organizational goa ls, especially quality objectives. Then, maintenance processes and integrated information system structures are defined. Maintenance process quality and improvement processes are defined using a set of performances, with a special emphasis placed on effectiveness and quality economics. At the end of the work, information system for improving maintenance economics is structured. Besides theoretical analysis, work also presents results authors obtained analyzing food industry, metal processing industry an d building materials industry.

  6. Discussing the Effective Factors on Maintenance of Human Resources

    OpenAIRE

    Bahare Shahriari

    2016-01-01

    In this research, the author has elaborated on detection of effective factors on maintenance and retention of human resources. Since human resources are the most resources for obtaining competitive advantage, it is essential to pay attention to different dimensions of human resources management. One of these dimensions is retention of human resources. Factors such as providing correct and valid information at the time of recruitment, assigning tasks based on competence, existence of a clear c...

  7. AREVA NP products and services for NPP operation and maintenance improvement

    International Nuclear Information System (INIS)

    Dechelette, Anne; Rat, Guy Le

    2009-01-01

    AREVA supplies customized services throughout the reactor improvement process according to clients' requirements: safety, performance, availability, obsolescence, operating and maintenance conditions, environment and technical assistance. Form design studies to on site modification and implementation including requalification tests, AREVA, as OEM*, has various products and services in the field of Engineering and Upgrading to satisfy client demands. In keeping with Inpo's AP913 approach, AREVA is particularly skilled in this methodology to help utilities improve availability factor and maintenance programs. AREVA has customized its services to many utilities in cooperating with local partners, suppliers, and engineering service providers through partnerships, consortiums, joint ventures, etc. AREVA's knowledge of the fleet's operation and maintenance experience helps NPP clients to identify the most cost effective improvements and approaches. Different examples of modifications of modifications and improvements performed in France and abroad illustrate AREVA's involvement in the NPP continuous upgrade process

  8. TRIZ method application for improving the special vehicles maintenance

    Directory of Open Access Journals (Sweden)

    Petrović Saša

    2014-01-01

    Full Text Available TRIZ methodology provides an opportunity for improving the classical engineering approach based on personal knowledge and experience. This paper presents the application of TRIZ methods for improving vehicle maintenance where special equipment is installed. A specific problem is the maintenance of the periscopes with heating system. Protective glass panels with heating system are rectangular glass elements. Their purpose is to perform mechanical protection of built-in prisms and provide heating of the prisms. Aging and long-term use leads to failure of these elements. The practice requires solutions in order to extend the lifetime of the system. New solution is evaluated by simulation and experiment.

  9. Residual life management. Maintenance improvement

    International Nuclear Information System (INIS)

    Sainero Garcia, J.; Hevia Ruperez, F.

    1995-01-01

    The terms Residual Life Management, Life Cycle Management and Long-Term Management are synonymous with a concept which aims to establish efficient maintenance for the profitable and safe operation of a power plant for as long as possible. A Residual Life Management programme comprises a number of stages, of which Maintenance Evaluation focuses on how power plant maintenance practices allow the mitigation and control of component ageing. with this objective in mind, a methodology has been developed for the analysis of potential degradative phenomena acting on critical components in terms of normal power plant maintenance practices. This methodology applied to maintenance evaluation enables the setting out of a maintenance programme based on the Life Management concept, and the programme's subsequent up-dating to allow for new techniques and methods. Initial applications have shown that although, in general terms, power plant maintenance is efficient, the way in which Residual Life Management is approached requires changes in maintenance practices. These changes range from modifications to existing inspection and surveillance methods or the establishment of new ones, to the monitoring of trends or the performance of additional studies, the purpose of which is to provide an accurate evaluation of the condition of the installations and the possibility of life extension. (Author)

  10. Identifying Human Factors Issues in Aircraft Maintenance Operations

    Science.gov (United States)

    Veinott, Elizabeth S.; Kanki, Barbara G.; Shafto, Michael G. (Technical Monitor)

    1995-01-01

    Maintenance operations incidents submitted to the Aviation Safety Reporting System (ASRS) between 1986-1992 were systematically analyzed in order to identify issues relevant to human factors and crew coordination. This exploratory analysis involved 95 ASRS reports which represented a wide range of maintenance incidents. The reports were coded and analyzed according to the type of error (e.g, wrong part, procedural error, non-procedural error), contributing factors (e.g., individual, within-team, cross-team, procedure, tools), result of the error (e.g., aircraft damage or not) as well as the operational impact (e.g., aircraft flown to destination, air return, delay at gate). The main findings indicate that procedural errors were most common (48.4%) and that individual and team actions contributed to the errors in more than 50% of the cases. As for operational results, most errors were either corrected after landing at the destination (51.6%) or required the flight crew to stop enroute (29.5%). Interactions among these variables are also discussed. This analysis is a first step toward developing a taxonomy of crew coordination problems in maintenance. By understanding what variables are important and how they are interrelated, we may develop intervention strategies that are better tailored to the human factor issues involved.

  11. Assessment and improvement of urban streets maintenance: Case study Kragujevac

    Directory of Open Access Journals (Sweden)

    Jokanović Igor

    2017-01-01

    Full Text Available City of Kragujevac struggles with providing road maintenance services due to limited funds and low capacity within the existing Public Utility Companies. As a solution to problems with traditional methods of contracting, many road authorities have moved to contracting road maintenance works to the private sector based on performance measures. The paper presents the outcomes of the study conducted for the purpose of improving current practice and condition of urban network within the City of Kragujevac through the application of performance-based maintenance contracting.

  12. A maintenance performance measurement framework that includesmaintenenace human factors: a case study from the electricity transmission industry

    Directory of Open Access Journals (Sweden)

    Peach, Rina

    2016-08-01

    Full Text Available Over the past two to three decades, maintenance management has undergone a paradigm shift; it is no longer seen as a necessary evil, but as an integral part of the business process that creates value for the organisation. The next step in the evolution of maintenance management is a maintenance performance measurement that includes human factors. The human factors in maintenance are well- known in the aviation industry, as it gained momentum in the early 1990s after a series of serious aviation accidents. Other industries, however, have been slow to integrate the human factor in their maintenance performance measurements. This paper discusses the results of a research project that investigated the use and importance of maintenance management performance measurements that focus specifically on human factors as part of the overall performance management system. From the research presented in this paper, ‘motivation’ and ‘competence’ were identified as the most important human performance factors in the maintenance of electricity transmission systems.

  13. Developing Predictive Maintenance Expertise to Improve Plant Equipment Reliability

    International Nuclear Information System (INIS)

    Wurzbach, Richard N.

    2002-01-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  14. Interface technology based on human cognition and understanding for the operation and maintenance of advanced human cooperative plants

    International Nuclear Information System (INIS)

    Numano, Masayoshi; Niwa, Yasuyuki; Itoh, Hiroko; Miyazaki, Keiko; Fukuto, Junji; Okazaki, Tadatsugi; Matsukura, Hiroshi; Tanaka, Kunihiko; Matsuoka, Takeshi; Liu, Qiao; Mitomo, Nobuo

    2006-01-01

    'Development of Intelligent Systems Technology for Advanced Human Cooperative Plants' was implemented as 'Nuclear Energy Fundamentals Crossover Research' by 3 institutes (The Institute of Physical and Chemical Research; RIKEN, National Institute of Advanced Industrial Science and Technology; AIST and National Maritime Research Institute; NMRI). Aiming at appropriate interaction between human and agents in Digital Maintenance Field which spreads widely in time and space, NMRI developed technologies on contraction of plant information, generalization and intuition of the information through visual presentation. Intuitive presentation gave on-site information for identifying the source of abnormalities to human operators. And a human-machine cooperation infrastructure for plant maintenance was proposed and developed, where an overview display was used to show position and state information of all the agents in the plant and each agent view was used to show the corresponding agent's information in detail. A part of this technology was implemented in a demonstration program. Two agents were developed to support human operators' plant maintenance activities in this program. This demonstration showed the effectiveness of human-agent cooperation for early plant abnormality detection. (author)

  15. The mapping and preparation of human resources for NPP’S operation and maintenance in Indonesia

    International Nuclear Information System (INIS)

    Moch-Djoko Birmano; Yohanes Dwi Anggoro

    2013-01-01

    The preparation of the competent human resources (HRs) is one of the basic infrastructure of NPP’s development. IAEA recommends that at the initial activity in preparation of human resources for NPP is doing Business Process Mapping by identifying the knowledge, skills and abilities of required human resources to carry out the operation and maintenance of NPPs. This study aims to mapping and preparing of human resources for NPP’s operation and maintenance in Indonesia. The method used are mapping business processes at operation and maintenance stage of NPP, identifying positions, conducting surveys with questionnaires and calculations, and data analysis. Surveys and questionnaires to determine the level of technical competence of personnel in BATAN at operation and maintenance stage. Analysis using the Method of Gap Analysis with human resources Competency Standards Criteria based on technical competence qualifications. This study uses the assumption that the nuclear power plant will be built 2 units (twin) and start operation in 2027. The results showed that from the aspect of education, BATAN able to meet the needs of human resources at 53.64 to 73.75%. While from the aspect of training and specific work experience, participation level of BATAN’s human resources is still very low of IAEA requirements. This case caused because young human resources in BATAN who have educational qualifications, experience, training and technical certifications in the field of operation and maintenance of nuclear power plants is still limited. Based on this, there should be preparation of NPP’s human resources with establish NPP’s human resources development program based on required qualifications. (author)

  16. Predictive Maintenance: One key to improved power plant availability

    International Nuclear Information System (INIS)

    Mobley; Allen, J.W.

    1986-01-01

    Recent developments in microprocessor technology has provided the ability to routinely monitor the actual mechanical condition of all rotating and reciprocating machinery and process variables (i.e. pressure, temperature, flow, etc.) of other process equipment within an operating electric power generating plant. This direct correlation between frequency domain vibration and actual mechanical condition of machinery and trending process variables of non-rotating equipment can provide the ''key'' to improving the availability and reliability, thermal efficiency and provide the baseline information necessary for developing a realistic plan for extending the useful life of power plants. The premise of utilizing microprocessor-based Predictive Maintenance to improve power plant operation has been proven by a number of utilities. This paper provides a comprehensive discussion of the TEC approach to Predictive Maintenance and examples of successful programs

  17. Investigating the causes of human error-induced incidents in the maintenance operations of petrochemical industry by using HFACS

    Directory of Open Access Journals (Sweden)

    Mohammadreza Azhdari

    2017-03-01

    Full Text Available Background & Objectives: Maintenance is an important tool for the petrochemical industries to prevent of accidents and increase operational and process safety success. The purpose of this study was to identify the possible causes of incidents caused by human error in the petrochemical maintenance activities by using Human Factors Analysis and Classification System (HFACS. Methods: This study is a cross-sectional analysis that was conducted in Zagros Petrochemical Company, Asaluyeh-Iran. A checklist of human error-induced incidents was developed based on four HFACS main levels and nineteen sub-groups. Hierarchical task analysis (HTA technique was used to identify maintenance activities and tasks. The main causes of possible incidents were identified by checklist and recorded. Corrective and preventive actions were defined depending on priority.   Results: The content analysis of worksheets of 444 activities showed 37.6% of the causes at the level of unsafe actions, 27.5% at the level of unsafe supervision, 20.9% at the level of preconditions for unsafe acts and 14% of the causes at the level of organizational effects. The HFACS sub-groups showed errors (24.36% inadequate supervision (14.89% and violations (13.26% with the most frequency. Conclusion: In order to prevent and reduce the occurrence of the identified errors, reducing the rate of the detected errors is crucial. Findings of this study showed that appropriate controlling measures such as periodical training of work procedures and supervision improvement decrease the human error-induced incidents in petrochemical industry maintenance.

  18. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K. [VTT Industrial Systems, Espoo (Finland)

    2006-12-15

    The focus in human reliability analysis of nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, human maintenance failures and design deficiencies, remained latent in the system, have an impact on the severity of a disturbance, e.g. by disabling safety-related equipment on demand. Especially common cause failures (CCFs) of safety related systems can affect the core damage risk to a significant extent. The topic has been addressed in Finnish studies, where experiences of latent human errors have been searched and analysed systematically from the maintenance history stored in the the power plant information systems of the Loviisa and Olkiluoto NPPs. Both the single and multiple errors (CCFs) were classified in detail and documented as error and event reports. The human CCFs involved human, organisational and technical factors. The review of the analysed single and multiple errors showed that instrumentation and control and electrical equipment are more prone to human error caused failure events than the other maintenance objects. The review of the analysed experience showed that most errors stem from the refuelling and maintenance outage periods. More than half of the multiple errors from the outages remained latent to the power operating periods. The review of the analysed multiple errors showed that difficulties with small plant modifications and planning of maintenance and operability were significant sources of common cause failures. The most dependent human errors originating from small modifications could be reduced by a more tailored planning and coverage of their start-up testing programs. Improvements could also be achieved by identifying better in work planning from the operating experiences those complex or intrusive repair and preventive maintenance work tasks and actions which are prone to errors. Such uncertain cases in important equipment require a more tailored work planning of the installation

  19. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Laakso, K.

    2006-12-01

    The focus in human reliability analysis of nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, human maintenance failures and design deficiencies, remained latent in the system, have an impact on the severity of a disturbance, e.g. by disabling safety-related equipment on demand. Especially common cause failures (CCFs) of safety related systems can affect the core damage risk to a significant extent. The topic has been addressed in Finnish studies, where experiences of latent human errors have been searched and analysed systematically from the maintenance history stored in the the power plant information systems of the Loviisa and Olkiluoto NPPs. Both the single and multiple errors (CCFs) were classified in detail and documented as error and event reports. The human CCFs involved human, organisational and technical factors. The review of the analysed single and multiple errors showed that instrumentation and control and electrical equipment are more prone to human error caused failure events than the other maintenance objects. The review of the analysed experience showed that most errors stem from the refuelling and maintenance outage periods. More than half of the multiple errors from the outages remained latent to the power operating periods. The review of the analysed multiple errors showed that difficulties with small plant modifications and planning of maintenance and operability were significant sources of common cause failures. The most dependent human errors originating from small modifications could be reduced by a more tailored planning and coverage of their start-up testing programs. Improvements could also be achieved by identifying better in work planning from the operating experiences those complex or intrusive repair and preventive maintenance work tasks and actions which are prone to errors. Such uncertain cases in important equipment require a more tailored work planning of the installation

  20. Homologous mechanisms of visuospatial working memory maintenance in macaque and human: Properties and sources

    Science.gov (United States)

    Reinhart, Robert M.G.; Heitz, Richard P.; Purcell, Braden A.; Weigand, Pauline K.; Schall, Jeffrey D.; Woodman, Geoffrey F.

    2012-01-01

    Although areas of frontal cortex are thought to be critical for maintaining information in visuospatial working memory, the event-related potential (ERP) index of maintenance is found over posterior cortex in humans. In the present study, we reconcile these seemingly contradictory findings. Here we show that macaque monkeys and humans exhibit the same posterior ERP signature of working memory maintenance that predicts the precision of the memory-based behavioral responses. In addition, we show that the specific pattern of rhythmic oscillations in the alpha band, recently demonstrated to underlie the human visual working memory ERP component, is also present in monkeys. Next, we concurrently recorded intracranial local field potentials from two prefrontal and another frontal cortical area to determine their contribution to the surface potential indexing maintenance. The local fields in the two prefrontal areas, but not the cortex immediately posterior, exhibited amplitude modulations, timing, and relationships to behavior indicating that they contribute to the generation of the surface ERP component measured from the distal posterior electrodes. Rhythmic neural activity in the theta and gamma bands during maintenance provided converging support for the engagement of the same brain regions. These findings demonstrate that nonhuman primates have homologous electrophysiological signatures of visuospatial working memory to those of humans and that a distributed neural network, including frontal areas, underlies the posterior ERP index of visuospatial working memory maintenance. PMID:22649249

  1. The role of human error in risk analysis: Application to pre- and post-maintenance procedures of process facilities

    International Nuclear Information System (INIS)

    Noroozi, Alireza; Khakzad, Nima; Khan, Faisal; MacKinnon, Scott; Abbassi, Rouzbeh

    2013-01-01

    Human factors play an important role in the safe operation of a facility. Human factors include the systematic application of information about human characteristics and behavior to increase the safety of a process system. A significant proportion of human errors occur during the maintenance phase. However, the quantification of human error probabilities in the maintenance phase has not been given the amount of attention it deserves. This paper focuses on a human factors analysis in pre-and post- pump maintenance operations. The procedures for removing process equipment from service (pre-maintenance) and returning the equipment to service (post-maintenance) are considered for possible failure scenarios. For each scenario, human error probability is calculated for each activity using the Success Likelihood Index Method (SLIM). Consequences are also assessed in this methodology. The risk assessment is conducted for each component and the overall risk is estimated by adding individual risks. The present study is aimed at highlighting the importance of considering human error in quantitative risk analyses. The developed methodology has been applied to a case study of an offshore process facility

  2. Computerizing Maintenance Management Improves School Processes.

    Science.gov (United States)

    Conroy, Pat

    2002-01-01

    Describes how a Computerized Maintenance Management System (CMMS), a centralized maintenance operations database that facilitates work order procedures and staff directives, can help individual school campuses and school districts to manage maintenance. Presents the benefits of CMMS and things to consider in CMMS selection. (EV)

  3. Design and evaluation of augmented reality for nuclear power plant maintenance based on Cognitive activity analysis

    International Nuclear Information System (INIS)

    Koo, Jwa Jin

    2008-02-01

    The goals of maintenance in nuclear power plants (NPPs) are to reduce the number of plant shutdowns, to decrease the shutdown time, to minimize the maintenance costs, and to improve nuclear safety. Furthermore, it is difficult for maintenance personnel to conduct work in NPPs due to the complexity of NPPs, safety issues and time constraints. Human errors should be prevented to achieve maintenance goals in NPPs. Therefore, it is necessary to improve working conditions by introducing support systems. Augmented Reality (AR) has the potential to assist with maintenance tasks and make maintenance personnel concentrate on the tasks, which will then the reduced human error and improve human performance. The working procedure for AR systems was designed based on the characteristics of cognitive activity, and an experiment was conducted to estimate the effectiveness of AR. The results indicated that a well-designed working procedure for AR systems was more effective than a conventional paper-based working procedure. In addition, participants made fewer errors using the designed working procedure. AR systems as maintenance support systems are beneficial technology that can improve maintenance performance by reducing cognitive loads and unnecessary movements. An AR application can be attractive and effective at supporting maintenance task

  4. Improved Nuclear Power Plant maintenance. Application to Cofrentes NPP

    International Nuclear Information System (INIS)

    Serradell, V.

    2002-01-01

    The Industrial Safety and Environment Group (MEDASEGI) of the Valencia Polytechnic University (UPV) develops its activities in the fields of environmental radioactivity metrology and risk analysis and management aimed at improving industrial safety. The different lines of research developed by this group include collaboration with Cofrentes NPP. This collaboration began in 1993 and has primarily focused on issues related to improved maintenance and currently on life management. (Author)

  5. Basic Characteristics of Human Erroneous Actions during Test and Maintenance Activities Leading to Unplanned Reactor Trips

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Park, Jin Kyun

    2010-01-01

    Test and maintenance (T and M) activities of nuclear power plants are essential for sustaining the safety of a power plant and maintaining the reliability of plant systems and components. However, the potential of human errors during T and M activities has also the potential to induce unplanned reactor trips or power derate or making safety-related systems unavailable. According to the major incident/accident reports of nuclear power plants in Korea, contribution of human errors takes up about 20% of the total events. The previous study presents that most of human-related unplanned reactor trip events during normal power operation are associated with T and M activities (63%), which are comprised of plant maintenance activities such as a 'periodic preventive maintenance (PPM)', a 'planned maintenance (PM)' and a 'corrective maintenance (CM)'. This means that T and M activities should be a major subject for reducing the frequency of human-related unplanned reactor trips. This paper aims to introduce basic characteristics of human erroneous actions involved in the test and maintenance-induced unplanned reactor trip events that have occurred between 1986 and 2006 in Korean nuclear power plants. The basic characteristics are described by dividing human erroneous actions into planning-based errors and execution-based errors. For the events associated with planning failures, they are, firstly, classified according to existence of the work procedure and then described for what aspects of the procedure or work plan have deficiency or problem. On the other hand, for the events associated with execution failures, they are described from the aspect of external error modes

  6. The Maintenance Personnel Performance Simulation (MAPPS) model: A human reliability analysis tool

    International Nuclear Information System (INIS)

    Knee, H.E.

    1985-01-01

    The Maintenance Personnel Performance Simulation (MAPPS) model is a computerized, stochastic, task-oriented human behavioral model developed to provide estimates of nuclear power plant (NPP) maintenance team performance measures. It is capable of addressing person-machine, person-environment, and person-person relationships, and accounts for interdependencies that exist between the subelements that make up the maintenance task of interest. The primary measures of performance estimated by MAPPS are: 1) the probability of successfully completing the task of interest and 2) the task duration time. MAPPS also estimates a host of other performance indices, including the probability of an undetected error, identification of the most- and least-likely error-prone subelements, and maintenance team stress profiles during task execution

  7. Evidence Accumulation and Choice Maintenance Are Dissociated in Human Perceptual Decision Making.

    Directory of Open Access Journals (Sweden)

    Mads Lund Pedersen

    Full Text Available Perceptual decision making in monkeys relies on decision neurons, which accumulate evidence and maintain choices until a response is given. In humans, several brain regions have been proposed to accumulate evidence, but it is unknown if these regions also maintain choices. To test if accumulator regions in humans also maintain decisions we compared delayed and self-paced responses during a face/house discrimination decision making task. Computational modeling and fMRI results revealed dissociated processes of evidence accumulation and decision maintenance, with potential accumulator activations found in the dorsomedial prefrontal cortex, right inferior frontal gyrus and bilateral insula. Potential maintenance activation spanned the frontal pole, temporal gyri, precuneus and the lateral occipital and frontal orbital cortices. Results of a quantitative reverse inference meta-analysis performed to differentiate the functions associated with the identified regions did not narrow down potential accumulation regions, but suggested that response-maintenance might rely on a verbalization of the response.

  8. 25 CFR 170.808 - Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can BIA Road Maintenance Program funds be used to improve... THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.808 Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities? No. BIA Road...

  9. Study on the methodology for predicting and preventing errors to improve reliability of maintenance task in nuclear power plant

    International Nuclear Information System (INIS)

    Hanafusa, Hidemitsu; Iwaki, Toshio; Embrey, D.

    2000-01-01

    The objective of this study was to develop and effective methodology for predicting and preventing errors in nuclear power plant maintenance tasks. A method was established by which chief maintenance personnel can predict and reduce errors when reviewing the maintenance procedures and while referring to maintenance supporting systems and methods in other industries including aviation and chemical plant industries. The method involves the following seven steps: 1. Identification of maintenance tasks. 2. Specification of important tasks affecting safety. 3. Assessment of human errors occurring during important tasks. 4. Identification of Performance Degrading Factors. 5. Dividing important tasks into sub-tasks. 6. Extraction of errors using Predictive Human Error Analysis (PHEA). 7. Development of strategies for reducing errors and for recovering from errors. By way of a trial, this method was applied to the pump maintenance procedure in nuclear power plants. This method is believed to be capable of identifying the expected errors in important tasks and supporting the development of error reduction measures. By applying this method, the number of accidents resulting form human errors during maintenance can be reduced. Moreover, the maintenance support base using computers was developed. (author)

  10. Improvement of the preventive maintenance program of an emergency diesel generator set

    International Nuclear Information System (INIS)

    Jacquot, J.P.; Meuwisse, C.; Cailleaux, J.P.

    1995-01-01

    An exhaustive Reliability Centered Maintenance (RCM) analysis was performed of the emergency diesel generator sets in Electricite de France 900-MW nuclear power plants. The first part of this paper describes the Reliability Centered Maintenance approach, including the functional breakdown, complete analysis of operation feedback and safety assessment of the risk induced by functional diesel failures. The second part shows how this kind of RCM analysis can be used to improve the efficiency of periodic tests of the machine, and more generally, the efficiency of condition-directed maintenance tasks. The underlying objective is to minimize risk and aging of the machine

  11. Industry assessment of human factors in aviation maintenance and inspection research program : an assessment of industry awareness and use of the Federal Aviation Administration Office of Aviation Medicine Human Factors in Aviation Maintenance and Inspect

    Science.gov (United States)

    1998-03-01

    Ten years ago the Federal Aviation Administration (FAA) Office of Aviation Medicine embarked on a research and development program dedicated to human factors in aviation maintenance and inspection. Since 1989 FAA has invested over $12M in maintenance...

  12. Airline Maintenance Manpower Optimization from the De Novo Perspective

    Science.gov (United States)

    Liou, James J. H.; Tzeng, Gwo-Hshiung

    Human resource management (HRM) is an important issue for today’s competitive airline marketing. In this paper, we discuss a multi-objective model designed from the De Novo perspective to help airlines optimize their maintenance manpower portfolio. The effectiveness of the model and solution algorithm is demonstrated in an empirical study of the optimization of the human resources needed for airline line maintenance. Both De Novo and traditional multiple objective programming (MOP) methods are analyzed. A comparison of the results with those of traditional MOP indicates that the proposed model and solution algorithm does provide better performance and an improved human resource portfolio.

  13. Improvement of industrial efficiency by knowledge management in maintenance engineering

    Directory of Open Access Journals (Sweden)

    Carlos Alberto Mariotoni

    2015-09-01

    Full Text Available This article shows research and studies dealing with the management of knowledge in industrial maintenance engineering, developed in the field of applied research in real industrial companies of Europe, which are the consequences of  having knowledge on islands, as well as measures improvements when there is an adequate knowledge management. The peculiarities which are given in the maintenance of the company departments, knowledge of operators and technicians operating in these areas, is heavily based on their experiences (strong tacit component, what is difficult to measure and articulate, and however, on numerous occasions, this break from the knowledge, can impose a high cost for the industry.

  14. Application of Dr. Mainte, integrated simulator of maintenance optimization, to LWRs

    International Nuclear Information System (INIS)

    Isobe, Yoshihiro; Sagisaka, Mitsuyuki; Etoh, Junji; Matsunaga, Takashi; Kosaka, Toru; Matsumoto, Satoshi; Yoshimura, Shinobu

    2015-01-01

    Dr. Mainte, an integrated simulator for maintenance optimization of LWRs (Light Water Reactors) is based on PFM (Probabilistic Fracture Mechanics) analyses. The concept of the simulator is to provide a decision-making system to optimize maintenance activities for typical components and piping systems in nuclear power plants totally and quantitatively in terms of safety, availability, economic rationality, environmental impact and social acceptance. For the further improvement of the safety and availability of nuclear power plants, the effect of human error and its reduction on the optimization of maintenance activities have been studied. In addition, an approach of reducing human error is proposed. (author)

  15. Ecological Interface Design of Augmented Reality Display for Nuclear Power Plant Maintenance

    International Nuclear Information System (INIS)

    Kim, In; Seong, Poong Hyun

    2008-01-01

    The importance of maintenance in nuclear power plants (NPPs) has been emphasized through many researches. The goals of maintenance in nuclear power plants are not only to reduce the number of shutdowns which directly affects to the profit, but also to prevent accidents or incidents hence improves nuclear safety. It is known that reduction of the rate of human error in maintenance tasks can be achieved if maintenance personnel are properly supported by maintenance support systems. Among many proposed maintenance support system, the use of augmented reality (AR) has been proposed

  16. Improving nuclear power plant reliability through predictive maintenance

    International Nuclear Information System (INIS)

    Geilhausen, R.; Kunze, U.

    1996-01-01

    Maintenance strategies can be assigned to one of three categories: failure maintenance, periodic maintenance or condition-oriented maintenance. The optimum maintenance scheme can be selected on the basis of a cost-benefit analysis but the safety of life and limb or the political climate for NPP can hardly expressed in numbers. The implementation of preventive maintenance needs two preconditions: high-performance instrumentation in the form of stationary and mobile monitoring systems for the determination of the condition of the nuclear power plant components and provision of a tool that can handle both the organization of the work and the evaluation of the results obtained. (authors)

  17. Human-centered automation of testing, surveillance and maintenance

    International Nuclear Information System (INIS)

    Bhatt, S.C.; Sun, B.K.H.

    1991-01-01

    Manual surveillance and testing of instrumentation, control and protection systems at nuclear power plants involves system and human errors which can lead to substantial plant down time. Frequent manual testing can also contribute significantly to operation and maintenance cost. Automation technology offers potential for prudent applications at the power plant to reduce testing errors and cost. To help address the testing problems and to harness the benefit of automation application, input from utilities is obtained on suitable automation approaches. This paper includes lessens from successful past experience at a few plants where some island of automation exist. The results are summarized as a set of specifications for semi automatic testing. A human-centered automation methodology is proposed with the guidelines for optimal human/computer division of tasks given. Implementation obstacles for significant changes of testing practices are identified and methods acceptable to nuclear power plants for addressing these obstacles have been suggested

  18. The improvement of maintenance service for traction networks equipment on the base of process approach

    Directory of Open Access Journals (Sweden)

    D. V. Mironov

    2014-12-01

    Full Text Available Purpose. The new methods development for improving the maintenance service for equipment of traction networks in order to increase its efficiency and quality. Methodology. In world practice of solving problems related to the quality of products and services is usually achieved by introducing quality management system in to the enterprises. The provisions of quality management system were used for solving the problem. The technologies of process engineering were used for describing the main stages of maintenance service. Findings. The development of high-speed movement and growth of its intensity, the use of electric rolling stock of a new generation require the introduction of new methods diagnostics of equipment technical state and improvement of the existing maintenance system and repair of power supply. Developing a model of business-processes, their optimization with using techniques of process engineering and system management is needed for the transition to the management system based on the process approach. From the standpoint of the process approach and in accordance with the requirements of the quality management system (ISO 9001-2009, the operation of the E (Department of electrification and power supply infrastructure sector is represented as a scheme of business-processes in which the guaranteed supply with electricity of railway and third-party consumers is defined as the main business-process of management. Each of the sub-process of power supply for consumers is described in details. The use methods and main stages of process approach for sample management system reorganization were investigated. The methodology and the application method of PDCA (Plan-Do-Check-Act closed loop to the equipment maintenance system were described. The monitoring process of traction networks maintenance using the process approach was divided into components after investigations. The technical documentation of maintenance service was investigated in

  19. Criteria and model for assessing and improving information technology maturity within maintenance

    International Nuclear Information System (INIS)

    Kans, M; Ehsanifard, K; Moniri, A

    2012-01-01

    Maintenance optimization and decision-making processes have been both influenced considerably by Information Technology (IT) developments mainly by increasing data availability. The decision-making process in its turn has affected systems trustworthiness positively. Therefore, theoretically speaking it could be said that Maintenance Management Information technology (MMIT) has the potential to provide applicable solutions for many of the maintenance management problems. Nevertheless, this potential has been hardly experienced in practice because of the mismatch between the level of IT maturity in the organizations and their selected MMIT solutions. To fill this gap this paper suggests a number of criteria which are crucial in decision making for selecting a MMIT application. The criteria are formed based on previous findings utilising an extensive literature review. A model is further developed for this purpose which is also tested on a case company active in power generation in Sweden. The model proved to be helpful when taking further improvement steps for reaching high utilization of IT in maintenance.

  20. A development of maintenance educational support method by using navigation method. Pt. 1. A conceptual design of RHR pump maintenance educational support prototype system

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo; Gouda, Hidenori

    2001-01-01

    The purpose of this research is before hand prevention of the systematic error produced from the fault of command / command system on the different organization in a nuclear power plant, and the individual error of the demand level of maintenance work, and knowledge and experience level of a maintenance worker produced from it being incongruent (mismatch), and generating of the serious accident and a serious trouble. This research attains optimization with the difficulty of maintenance work, and work execution capability, such as the persons concerned (a supervision person, a construction person, work person), and proposes the new 'maintenance educational support technique' which is useful to the improvement in 'work reliability' and 'before hand prevention of a human error' in the maintenance work spot. The main results concerning this research are shown below. (1) In this research, concept design of RHR pump maintenance work educational support prototype system was performed on the basis of the examination result of a process analysis of RHR pump maintenance work, load mapping, a rule base/knowledge base and a data base/filing system. Consequently, when an educator-ed talked with a data base/filing system along with load mapping of maintenance work (Why, How, What), a possibility that it could reach exactly from work start to the sub goal or the last goal and timely was suggested. (2) As a result of classifying 'the difficulty of maintenance work', and man's work execution capability' and comparing the result using SRK (behavior of human) index which Rasmussen proposed, among both, it turns out that difference (inharmonious) arises. The exact presentation of the educational method or educational material which responded to knowledge and experience level of an educational achievement target or an educator-ed can be referred to as being connected with the improvement in work reliability, and before hand prevention of a human error as a result by then, incorporating

  1. MAPPS (Maintenance Personnel Performance Simulation): a computer simulation model for human reliability analysis

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.

    1985-01-01

    A computer model has been developed, sensitivity tested, and evaluated capable of generating reliable estimates of human performance measures in the nuclear power plant (NPP) maintenance context. The model, entitled MAPPS (Maintenance Personnel Performance Simulation), is of the simulation type and is task-oriented. It addresses a number of person-machine, person-environment, and person-person variables and is capable of providing the user with a rich spectrum of important performance measures including mean time for successful task performance by a maintenance team and maintenance team probability of task success. These two measures are particularly important for input to probabilistic risk assessment (PRA) studies which were the primary impetus for the development of MAPPS. The simulation nature of the model along with its generous input parameters and output variables allows its usefulness to extend beyond its input to PRA

  2. Introducing artificial depth cues to improve task performance in ITER maintenance actions

    International Nuclear Information System (INIS)

    Heemskerk, C.J.M.; Eendebak, P.T.; Schropp, G.Y.R.; Hermes, H.V.; Elzendoorn, B.S.Q.; Magielsen, A.J.

    2013-01-01

    Highlights: ► Operators regard lack of 3D perception as primary factor hindering remote maintenance. ► Promising techniques to improve depth perception are depth gauges and stereo vision. ► First experiment shows artificial depth gauges need to be designed with care. ► Second experiment shows that stereo vision improves task performance significantly. -- Abstract: Maintenance operations on ITER tokamak components will be largely performed by remote handling. In previous work it was shown that representative maintenance tasks could be performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators indicated that they regarded the lack of 3D perception as the primary factor hindering their performance. This paper discusses various techniques to improve depth perception in teleoperation, including stereo vision, head tracking, virtual camera views and depth gauges. The most promising techniques were tested. Performance metrics included time-to-complete, path analysis and operator work-load. In a first experiment, artificial depth gauges views were tested in a 1:1 scale hardware testbed with mechanical master-slave manipulators handled by experienced operators. Robust real-time image processing was achieved with marker-based objects. The simple depth gauge and graphical overlay did not significantly improve task performance. Operators commented on their view of the task being “obstructed” by the graphical overlay, and the depth gauge was judged not very informative. In a second experiment, real time tracking was combined with VR display including stereo and head tracking. While stereo was found to improve the task performance significantly over the 1 camera (mono) condition, head tracking unexpectedly did not

  3. Introducing artificial depth cues to improve task performance in ITER maintenance actions

    Energy Technology Data Exchange (ETDEWEB)

    Heemskerk, C.J.M., E-mail: c.heemskerk@heemskerk-innovative.nl [Heemskerk Innovative Technology, Sassenheim (Netherlands); Eendebak, P.T. [TNO Netherlands Organisation for Applied Scientific Research (Netherlands); Schropp, G.Y.R. [Heemskerk Innovative Technology, Sassenheim (Netherlands); Hermes, H.V. [TU Eindhoven (Netherlands); Elzendoorn, B.S.Q. [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, P.O. Box 1207, 3430 BE Nieuwegein (Netherlands); Magielsen, A.J. [NRG, P.O. Box 25, 1755 ZG Petten (Netherlands)

    2013-10-15

    Highlights: ► Operators regard lack of 3D perception as primary factor hindering remote maintenance. ► Promising techniques to improve depth perception are depth gauges and stereo vision. ► First experiment shows artificial depth gauges need to be designed with care. ► Second experiment shows that stereo vision improves task performance significantly. -- Abstract: Maintenance operations on ITER tokamak components will be largely performed by remote handling. In previous work it was shown that representative maintenance tasks could be performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators indicated that they regarded the lack of 3D perception as the primary factor hindering their performance. This paper discusses various techniques to improve depth perception in teleoperation, including stereo vision, head tracking, virtual camera views and depth gauges. The most promising techniques were tested. Performance metrics included time-to-complete, path analysis and operator work-load. In a first experiment, artificial depth gauges views were tested in a 1:1 scale hardware testbed with mechanical master-slave manipulators handled by experienced operators. Robust real-time image processing was achieved with marker-based objects. The simple depth gauge and graphical overlay did not significantly improve task performance. Operators commented on their view of the task being “obstructed” by the graphical overlay, and the depth gauge was judged not very informative. In a second experiment, real time tracking was combined with VR display including stereo and head tracking. While stereo was found to improve the task performance significantly over the 1 camera (mono) condition, head tracking unexpectedly did not.

  4. Human factors issues in aircraft maintenance and inspection : "information exchange and communications".

    Science.gov (United States)

    1990-11-01

    The Federal Aviation Administration sponsored a 2-day meeting in December 1989 as part of a continuing program to address issues of human factors and personnel performance in aviation maintenance and inspection. This meeting focused on issues of "inf...

  5. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  6. Information Management System Development for the Characterization and Analysis of Human Error in Naval Aviation Maintenance Related Mishaps

    National Research Council Canada - National Science Library

    Wood, Brian

    2000-01-01

    .... The Human Factors Analysis and Classification System-Maintenance Extension taxonomy, an effective framework for classifying and analyzing the presence of maintenance errors that lead to mishaps...

  7. Human temporal cortical single neuron activity during working memory maintenance.

    Science.gov (United States)

    Zamora, Leona; Corina, David; Ojemann, George

    2016-06-01

    The Working Memory model of human memory, first introduced by Baddeley and Hitch (1974), has been one of the most influential psychological constructs in cognitive psychology and human neuroscience. However the neuronal correlates of core components of this model have yet to be fully elucidated. Here we present data from two studies where human temporal cortical single neuron activity was recorded during tasks differentially affecting the maintenance component of verbal working memory. In Study One we vary the presence or absence of distracting items for the entire period of memory storage. In Study Two we vary the duration of storage so that distractors filled all, or only one-third of the time the memory was stored. Extracellular single neuron recordings were obtained from 36 subjects undergoing awake temporal lobe resections for epilepsy, 25 in Study one, 11 in Study two. Recordings were obtained from a total of 166 lateral temporal cortex neurons during performance of one of these two tasks, 86 study one, 80 study two. Significant changes in activity with distractor manipulation were present in 74 of these neurons (45%), 38 Study one, 36 Study two. In 48 (65%) of those there was increased activity during the period when distracting items were absent, 26 Study One, 22 Study Two. The magnitude of this increase was greater for Study One, 47.6%, than Study Two, 8.1%, paralleling the reduction in memory errors in the absence of distracters, for Study One of 70.3%, Study Two 26.3% These findings establish that human lateral temporal cortex is part of the neural system for working memory, with activity during maintenance of that memory that parallels performance, suggesting it represents active rehearsal. In 31 of these neurons (65%) this activity was an extension of that during working memory encoding that differed significantly from the neural processes recorded during overt and silent language tasks without a recent memory component, 17 Study one, 14 Study two

  8. Human Temporal Cortical Single Neuron Activity During Working Memory Maintenance

    Science.gov (United States)

    Zamora, Leona; Corina, David; Ojemann, George

    2016-01-01

    The Working Memory model of human memory, first introduced by Baddeley and Hitch (1974), has been one of the most influential psychological constructs in cognitive psychology and human neuroscience. However the neuronal correlates of core components of this model have yet to be fully elucidated. Here we present data from two studies where human temporal cortical single neuron activity was recorded during tasks differentially affecting the maintenance component of verbal working memory. In Study One we vary the presence or absence of distracting items for the entire period of memory storage. In Study Two we vary the duration of storage so that distractors filled all, or only one-third of the time the memory was stored. Extracellular single neuron recordings were obtained from 36 subjects undergoing awake temporal lobe resections for epilepsy, 25 in Study one, 11 in Study two. Recordings were obtained from a total of 166 lateral temporal cortex neurons during performance of one of these two tasks, 86 study one, 80 study two. Significant changes in activity with distractor manipulation were present in 74 of these neurons (45%), 38 Study one, 36 Study two. In 48 (65%) of those there was increased activity during the period when distracting items were absent, 26 Study One, 22 Study Two. The magnitude of this increase was greater for Study One, 47.6%, than Study Two, 8.1%, paralleling the reduction in memory errors in the absence of distracters, for Study One of 70.3%, Study Two 26.3% These findings establish that human lateral temporal cortex is part of the neural system for working memory, with activity during maintenance of that memory that parallels performance, suggesting it represents active rehearsal. In 31 of these neurons (65%) this activity was an extension of that during working memory encoding that differed significantly from the neural processes recorded during overt and silent language tasks without a recent memory component, 17 Study one, 14 Study two

  9. Improvement of railway ballast maintenance approach, incorporating ballast geometry and fouling conditions

    Science.gov (United States)

    Sadeghi, J.; Motieyan-Najar, M. E.; Zakeri, J. A.; Yousefi, B.; Mollazadeh, M.

    2018-04-01

    Ballast plays an important role in the stability of railway track systems. The effectiveness of the ballast in maintaining the track stability is very much dependent on its mechanical conditions. The available ballast maintenance approaches are mainly based on only track geometry conditions (such as track profile) which do not sufficiently reflect the ballast mechanical behaviors. That is, the ballast potential of degradation (i.e., ballast long term behaviors) has been omitted. This makes the effectiveness of the current ballast maintenance approach questionable, indicating a need for a more comprehensive and effective ballast conditions assessment technique. In response to this need, two ballast condition indices based on ballast geometry degradation (BGI) and the level of ballast fouling (BFI) as the main indicators of ballast mechanical behavior were developed. The BGI is a function of the standard deviations of track alignment, unevenness and twist. The BFI was developed based on the data obtained from the ground penetration radar (GPR). Making use of the new indices, a more reliable maintenance algorithm was developed. Through illustrations of the applicability of the new maintenance algorithm in a railway line, it was shown that the new algorithm causes a considerable improvement in the maintenance effectiveness and an increase in the life cycle of railway tracks by making more effective allocation of resources and more accurate maintenance planning.

  10. Performance Improvement through Implementation of Lean Maintenance

    OpenAIRE

    S. Kolanjiappan; Dr. K. Maran

    2011-01-01

    Lean Maintenance is a relatively new term, invented in the last decade of the twentieth century, but the principles are well established in Total Productive Maintenance (TPM). Lean Maintenance—taking its lead from Lean Manufacturing—applies some new techniques to TPM concepts to render a more structured implementation path. Tracing its roots back to Henry Ford with modern refinements born in Japanese manufacturing, specifically the Toyota Production System (TPS). Lean seeks to eliminate a...

  11. Beneficial Effects of a Dietary Weight Loss Intervention on Human Gut Microbiome Diversity and Metabolism Are Not Sustained during Weight Maintenance.

    Science.gov (United States)

    Heinsen, Femke-Anouska; Fangmann, Daniela; Müller, Nike; Schulte, Dominik M; Rühlemann, Malte C; Türk, Kathrin; Settgast, Ute; Lieb, Wolfgang; Baines, John F; Schreiber, Stefan; Franke, Andre; Laudes, Matthias

    2016-01-01

    In the present study, we examined the effect of a very low-calorie diet(VLCD)-based obesity program on human gut microbiome diversity and metabolism during weight loss and weight maintenance. Obese subjects underwent 3 months of VLCD followed by 3 months of weight maintenance. A lean and an obese control group were included. The microbiome was characterized by performing high-throughput dual-indexed 16S rDNA amplicon sequencing. At baseline, a significant difference in the Firmicutes/Bacteroidetes ratio between the lean and obese individuals was observed (p = 0.047). The VLCD resulted in significant alterations in gut microbiome diversity from baseline to 3 months (p = 0.0053). Acinetobacter represented an indicator species for the observed effect (indicator value = 0.998, p = 0.006). Metabolic analyses revealed alterations of the bacterial riboflavin pathway from baseline to 3 months (pnom = 0.0078). These changes in diversity and bacterial metabolism induced by VLCD diminished during the weight maintenance phase, despite sustained reductions in body weight and sustained improvements of insulin sensitivity. The present data show that a VLCD is able to beneficially alter both gut microbiome diversity and metabolism in obese humans, but that these changes are not sustained during weight maintenance. This finding might suggest that the microbiome should be targeted during obesity programs. © 2016 The Author(s) Published by S. Karger GmbH, Freiburg.

  12. Beneficial Effects of a Dietary Weight Loss Intervention on Human Gut Microbiome Diversity and Metabolism Are Not Sustained during Weight Maintenance

    Directory of Open Access Journals (Sweden)

    Femke-Anouska Heinsen

    2016-11-01

    Full Text Available Objective: In the present study, we examined the effect of a very low-calorie diet(VLCD-based obesity program on human gut microbiome diversity and metabolism during weight loss and weight maintenance. Methods: Obese subjects underwent 3 months of VLCD followed by 3 months of weight maintenance. A lean and an obese control group were included. The microbiome was characterized by performing high-throughput dual-indexed 16S rDNA amplicon sequencing. Results: At baseline, a significant difference in the Firmicutes/Bacteroidetes ratio between the lean and obese individuals was observed (p = 0.047. The VLCD resulted in significant alterations in gut microbiome diversity from baseline to 3 months (p = 0.0053. Acinetobacter represented an indicator species for the observed effect (indicator value = 0.998, p = 0.006. Metabolic analyses revealed alterations of the bacterial riboflavin pathway from baseline to 3 months (pnom = 0.0078. These changes in diversity and bacterial metabolism induced by VLCD diminished during the weight maintenance phase, despite sustained reductions in body weight and sustained improvements of insulin sensitivity. Conclusion: The present data show that a VLCD is able to beneficially alter both gut microbiome diversity and metabolism in obese humans, but that these changes are not sustained during weight maintenance. This finding might suggest that the microbiome should be targeted during obesity programs.

  13. Advances in new WWER designs to improve operation and maintenance

    International Nuclear Information System (INIS)

    Dragunov, Y.G.; Ryzhov, S.B.; Podshibiakin, A.K.; Vasilchenko, I.N.; Repin, A.I.; Nikitenko, M.P.; Konoplev, N.P.; Fil, N.S.

    2000-01-01

    Economic operational indices of WWER-type reactors show their competitiveness in all the countries where these reactors operate. Advanced WWERs being designed and constructed now have the improved characteristics of economical efficiency and are more convenient for operation and maintenance. Many technical solutions aimed at improvement of the operational performance are implemented in the design of WWER-1000/V-392 and WWER-640/V-407, and these reactors are the important basis for the nuclear power expansion in Russia. Some of these solutions are considered in the present paper. (author)

  14. New roles of the human Suv3 helicase in genome maintenance

    DEFF Research Database (Denmark)

    Venø, Susanne Trillingsgaard

    During her PhD studies, Susanne Trillingsgaard Venø carried out research into the role of the human Suv3 protein in stabilising the human genome – DNA. Suv3 is a helicase that separates the two strands of the DNA’s double helix. Throughout our lives, the DNA in our cells is constantly exposed...... maintenance. Based on these new research results, the Suv3 protein could be a valuable model for genome stability as an important factor in our understanding of why we get old....

  15. Maintenance Personnel Performance Simulation (MAPPS) model: a human reliability analysis tool

    International Nuclear Information System (INIS)

    Knee, H.E.

    1985-01-01

    The Maintenance Personnel Performance Simulation (MAPPS) model is a computerized, stochastic, task-oriented human behavioral model developed to provide estimates of nuclear power plant (NPP) maintenance team performance measures. It is capable of addressing person-machine, person-environment, and person-person relationships, and accounts for interdependencies that exist between the subelements that make up the maintenance task of interest. The primary measures of performance estimated by MAPPS are: (1) the probability of successfully completing the task of interest; and (2) the task duration time. MAPPS also estimates a host of other performance indices, including the probability of an undetected error, identification of the most- and least-likely error-prone subelements, and maintenance team stress profiles during task execution. The MAPPS model was subjected to a number of evaluation efforts that focused upon its practicality, acceptability, usefulness, and validity. Methods used for these efforts included a case method approach, consensus estimation, and comparison with observed task performance measures at a NPP. Favorable results, such as close agreement between task duration times for two tasks observed in the field (67.0 and 119.8 minutes, respectively), and estimates by MAPPS (72.0 and 124.0 minutes, respectively) enhance the confidence in the future use of MAPPS. 8 refs., 1 fig

  16. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  17. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun

    2009-01-01

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors

  18. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2009-05-15

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors.

  19. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  20. Web-Based Information Management System for the Investigation, Reporting, and Analysis of Human Error in Naval Aviation Maintenance

    National Research Council Canada - National Science Library

    Boex, Anthony

    2001-01-01

    .... The Human Factors Analysis and Classification System-Maintenance Extension (HFACS-ME) taxonomy, a framework for classifying and analyzing the presence of maintenance errors that lead to mishaps, is the foundation of this tool...

  1. Dr. Mainte. Integrated simulator of maintenance optimization of LWRs

    International Nuclear Information System (INIS)

    Isobe, Yoshihiro; Sagisaka, Mitsuyuki; Etoh, Junji; Matsunaga, Takashi; Kosaka, Toru; Matsumoto, Satoshi; Yoshimura, Shinobu

    2014-01-01

    Dr. Mainte, an integrated simulator for maintenance optimization of LWRs (Light Water Reactors) has been developed based on PFM (Probabilistic Fracture Mechanics) analyses. The concept of the simulator is to provide a decision-making system to optimize maintenance activities for representative components and piping systems in nuclear power plants totally and quantitatively in terms of safety, availability and economic efficiency, environmental impact and social acceptance. For the further improvement of the safety and availability, the effect of human error and its reduction on the optimization of plant maintenance activities and approaches of reducing it have been studied. (author)

  2. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  3. Long-term maintenance of human induced pluripotent stem cells by automated cell culture system.

    Science.gov (United States)

    Konagaya, Shuhei; Ando, Takeshi; Yamauchi, Toshiaki; Suemori, Hirofumi; Iwata, Hiroo

    2015-11-17

    Pluripotent stem cells, such as embryonic stem cells and induced pluripotent stem (iPS) cells, are regarded as new sources for cell replacement therapy. These cells can unlimitedly expand under undifferentiated conditions and be differentiated into multiple cell types. Automated culture systems enable the large-scale production of cells. In addition to reducing the time and effort of researchers, an automated culture system improves the reproducibility of cell cultures. In the present study, we newly designed a fully automated cell culture system for human iPS maintenance. Using an automated culture system, hiPS cells maintained their undifferentiated state for 60 days. Automatically prepared hiPS cells had a potency of differentiation into three germ layer cells including dopaminergic neurons and pancreatic cells.

  4. Human errors in test and maintenance of nuclear power plants. Nordic project work

    International Nuclear Information System (INIS)

    Andersson, H.; Liwaang, B.

    1985-08-01

    The present report is a summary of the NKA/LIT-1 project performed for the period 1981-1985. The report summarizes work on human error influence in test and calibration activities in nuclear power plants, reviews problems regarding optimization of the test intervals, organization of test and maintenance activities, and the analysis of human error contribution to the overall risk in test and mainenace tasks. (author)

  5. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  6. Improving CANDU plant operation and maintenance through retrofit information technology systems

    International Nuclear Information System (INIS)

    Lupton, L.R.; Judd, R.A.; MacBeth, M.J.

    1998-01-01

    CANDU plant owners are facing an increasingly competitive environment for the generation of electricity. To meet this challenge, all owners have identified that information technology offers opportunities for significant improvements in CANDU operation, maintenance and administration (OM and A) costs. Targeted information technology application areas include instrumentation and control, engineering, construction, operations and plant information management. These opportunities also pose challenges and issues that must be addressed if the full benefits of the advances in information technology are to be achieved. Key among these are system hardware and software maintenance, and obsolescence protection; AECL has been supporting CANDU stations with the initial development and evaluation of systems to improve plant performance and cost. Key initiatives that have been implemented or are in the process of being implemented in some CANDU plants to achieve operational benefits include: critical safety parameter monitor system; advanced computerized annunciation system; plant historical data system; and plant display system. Each system will be described in terms of its role in enhancing current CANDU plant performance and how they will contribute to future CANDU plant performance

  7. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  8. Improvement of testing and maintenance based on fault tree analysis

    International Nuclear Information System (INIS)

    Cepin, M.

    2000-01-01

    Testing and maintenance of safety equipment is an important issue, which significantly contributes to safe and efficient operation of a nuclear power plant. In this paper a method, which extends the classical fault tree with time, is presented. Its mathematical model is represented by a set of equations, which include time requirements defined in the house event matrix. House events matrix is a representation of house events switched on and off through the discrete points of time. It includes house events, which timely switch on and off parts of the fault tree in accordance with the status of the plant configuration. Time dependent top event probability is calculated by the fault tree evaluations. Arrangement of components outages is determined on base of minimization of mean system unavailability. The results show that application of the method may improve the time placement of testing and maintenance activities of safety equipment. (author)

  9. Improving the development, use and control of maintenance procedures

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; Radford, L.R.; Wheeler, W.A.; Badalamente, R.V.

    1985-12-01

    This paper describes the results of a project conducted for the US Nuclear Regulatory Commission (NRC) to assess and document the need for guidance or regulatory involvement by the NRC in the development, upgrading, use and control of maintenance procedures in US nuclear power plants. Presented are the findings of the following activities: (1) a survey of current maintenance procedure practices in seven US nuclear power plants; (2) a review and analysis of plant administrative and maintenance procedures; (3) a survey of maintenance procedure practices in industries that share some characteristics with the nuclear industry; and (4) a review of the research pertaining to job performance aids and a brief analysis of their applicability to maintenance in nuclear power plants. Based on these findings, several recommendations to upgrade maintenance procedures are offered

  10. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  11. Improving industrial maintenance contract relationships

    NARCIS (Netherlands)

    De Jong, A.

    2010-01-01

    Unavailability of technical systems, such as aircraft, is expensive. Technical systems require maintenance to prevent and to remedy defects that cause unavailability. Users of technical systems usually bear the consequences of the risk of unavailability, in particular the loss of productivity. This

  12. Human area MT+ shows load-dependent activation during working memory maintenance with continuously morphing stimulation.

    Science.gov (United States)

    Galashan, Daniela; Fehr, Thorsten; Kreiter, Andreas K; Herrmann, Manfred

    2014-07-11

    Initially, human area MT+ was considered a visual area solely processing motion information but further research has shown that it is also involved in various different cognitive operations, such as working memory tasks requiring motion-related information to be maintained or cognitive tasks with implied or expected motion.In the present fMRI study in humans, we focused on MT+ modulation during working memory maintenance using a dynamic shape-tracking working memory task with no motion-related working memory content. Working memory load was systematically varied using complex and simple stimulus material and parametrically increasing retention periods. Activation patterns for the difference between retention of complex and simple memorized stimuli were examined in order to preclude that the reported effects are caused by differences in retrieval. Conjunction analysis over all delay durations for the maintenance of complex versus simple stimuli demonstrated a wide-spread activation pattern. Percent signal change (PSC) in area MT+ revealed a pattern with higher values for the maintenance of complex shapes compared to the retention of a simple circle and with higher values for increasing delay durations. The present data extend previous knowledge by demonstrating that visual area MT+ presents a brain activity pattern usually found in brain regions that are actively involved in working memory maintenance.

  13. A predictive maintenance approach for improved nuclear plant availability

    International Nuclear Information System (INIS)

    Verma, R.M.P.; Pandya, M.B.; Kini, M.P.

    1979-01-01

    Predictive maintenance programme as against preventive maintenance programme aims at diagnosing, inspecting, monitoring, and objective condition-checking of equipment. It helps in forecasting failures, and scheduling the optimal frequencies for overhauls, replacements, lubrication etc. It also helps in establishing work load, manpower, resource planning and inventory control. Various stages of predictive maintenance programme for a nuclear power plant are outlined. A partial list of instruments for predictive maintenance is given. (M.G.B.)

  14. Engine health monitoring systems: Tools for improved maintenance management in the 1980's

    Science.gov (United States)

    Kimball, J. C.

    1981-01-01

    The performance monitoring aspect of maintenance, characteristic of the engine health monitoring system are discussed. An overview of the system activities is presented and a summary of programs for improved monitoring in the 1980's are discussed.

  15. Proposal of a framework for solving human factors of artificial systems and its application to maintenance work

    International Nuclear Information System (INIS)

    Nagamatsu, Takashi; Otsuji, Tomoo; Yoshikawa, Hidekazu; Shiba, Shigenari

    2004-01-01

    A framework for solving human factors of artificial systems is proposed in this study, where a whole system of machines and the human organization that involves in the operation and management of machines is defined as an 'artificial system'. Five aspects of human factors in the artificial system are first discussed, and the types of artificial system with respect to the human factors are divided into three levels from a viewpoint of complexity. A framework that can treat artificial systems by unified methodology has been proposed for treating both the complexity level and the different kinds of human factors. As a concrete example of this framework application, a prototype system has been developed for advanced plant maintenance support by using ES-HMD (Eye Sensing-Head Mounted Display). This is a remote communication system of cooperative maintenance work between the expert in a remote support center and the maintenance worker at a certain machine in the plant site to conduct a complicated task without committing human error. It was confirmed by laboratory experiment that the expert would instruct the worker so that he or she could perform the task successfully, by observing the worker's eye gazing point and by pointing the right place of action on the transferred display of the worker's eyesight through the ES-MHD. (author)

  16. Present Situation and Problems of Land Improvement District as an Operation and Maintenance Organization of Land Improvement Facilities

    OpenAIRE

    長堀, 金造; 赤江, 剛夫; 大田, 征六

    1994-01-01

    Land improvement districts originally started as organizations after World War II: They are in charge of construction and operation of irrigation and drainage facilities, Development of agricultural land, reclamation from sea water, reclamation by filling, Recovery from disaster, exchange and consolidation of agricultural land and so on. As the Main construction projects were completed, the purpose of land improvement districts Has shifted from facilities construction to operation and mainten...

  17. Improvement of maintenance engineering using plant network and personal digital assistant

    International Nuclear Information System (INIS)

    Otani, Yohei; Hasegawa, Takeshi; Hoshino, Masateru; Kato, Takahisa; Yokoi, Miki

    2015-01-01

    Toshiba has developed and adopted wired and/or wireless maintenance network at nuclear power plant in cooperate with industry. Toshiba also developed a tablet PC based field testing tool that enables to display test procedures and record test results in the field to improve the efficiency of such testing. Recently, we have adopted remote desktop protocol that enables to support the operator. (author)

  18. Design for improved maintenance of the fiber-optic cable system (As carried out in a concurrent engineering environment)

    Science.gov (United States)

    Tremoulet, P. C.

    The author describes a number of maintenance improvements in the Fiber Optic Cable System (FOCS). They were achieved during a production phase pilot concurrent engineering program. Listed in order of importance (saved maintenance time and material) by maintenance level, they are: (1) organizational level: improved fiber optic converter (FOC) BITE; (2) Intermediate level: reduced FOC adjustments from 20 to 2; partitioned FOC into electrical and optical parts; developed cost-effective fault isolation test points and test using standard test equipment; improved FOC chassis to have lower mean time to repair; and (3) depot level: revised test requirements documents (TRDs) for common automatic test equipment and incorporated ATE testability into circuit and assemblies and application-specific integrated circuits. These improvements met this contract's tailored logistics MIL-STD 1388-1A requirements of monitoring the design for supportability and determining the most effective support equipment. Important logistics lessons learned while accomplishing these maintainability and supportability improvements on the pilot concurrent engineering program are also discussed.

  19. Human Reliability Analysis. Applicability of the HRA-concept in maintenance shutdown

    International Nuclear Information System (INIS)

    Obenius, Aino

    2007-08-01

    Probabilistic Safety Analysis (PSA) is performed for Swedish nuclear power plants in order to make predictions and improvements of system safety. The analysis of the Three Mile Island and Chernobyl accidents contributed to broaden the approach to nuclear power plant safety. A system perspective focusing on the interaction between aspects of Man, Technology and Organization (MTO) emerged in addition to the development of Human Factors knowledge. To take the human influence on the technical system into consideration when performing PSAs, a Human Reliability Analysis (HRA) is performed. PSA is performed for different stages and plant operating states, and the current state of Swedish analyses is Low power and Shutdown (LPSD), also called Shutdown PSA (SPSA). The purpose of this master's thesis is to describe methods and basic models used when analysing human reliability for the LPSD state. The following questions are at issue: 1. How can the LPSD state be characterised and defined? 2. What is important to take into consideration when performing a LPSD HRA? 3. How can human behaviour be modelled for a LPSD risk analysis? 4. According to available empirical material, how are the questions above treated in performed analysis of human operation during LPSD? 5. How does the result of the questions above affect the way methods for analysis of LPSD could and/or should be developed? The procedure of this project has mainly consisted of literature studies of available theory for modelling of human behaviour and risk analysis of the LPSD state. This study regards analysis of planned outages when maintenance, fuel change, tests and inspections are performed. The outage period is characterised by planned maintenance activities performed in rotating 3-shifts, around the clock, as well as many of the persons performing work tasks on the plant being external contractors. The working conditions are characterised by stress due to heat, radiation and physically demanding or monotonous

  20. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  1. IMPLEMENTASI TOTAL PRODUCTIVE MAINTENANCE DI DEPARTEMEN NON JAHIT PT. KERTA RAJASA RAYA

    Directory of Open Access Journals (Sweden)

    Ronald E. Stok

    2001-01-01

    Full Text Available The effectivity improvement of production facility in factory is not only on facility manitenance but also on human resources. Total Productive Maintenance (TPM gives an optimal solution to effectivity improvement. A case study of TPM implementation have done in non sewing department of PT Kerta Rajasa Raya. Abstract in Bahasa Indonesia : Peningkatan efektivitas dari fasilitas produksi di suatu perusahaan bukan hanya terbatas pada perawatan fasilitas kerja saja tetapi juga sumber daya manusia. Total Productive Maintenance (TPM memberikan suatu solusi optimal terhadap peningkatan efektivitas dengan melibatkan semua sumber daya manusia yang bertanggung jawab terhadap fasilitas produksi. Suatu studi kasus terhadap pengimplementasian TPM dilakukan di departemen non jahit PT. Kerta Rajasa Raya. Kata kunci : TPM, MTTF, Autonomous Maintenance.

  2. A Human Error Analysis Procedure for Identifying Potential Error Modes and Influencing Factors for Test and Maintenance Activities

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Park, Jin Kyun

    2010-01-01

    Periodic or non-periodic test and maintenance (T and M) activities in large, complex systems such as nuclear power plants (NPPs) are essential for sustaining stable and safe operation of the systems. On the other hand, it also has been raised that human erroneous actions that might occur during T and M activities has the possibility of incurring unplanned reactor trips (RTs) or power derate, making safety-related systems unavailable, or making the reliability of components degraded. Contribution of human errors during normal and abnormal activities of NPPs to the unplanned RTs is known to be about 20% of the total events. This paper introduces a procedure for predictively analyzing human error potentials when maintenance personnel perform T and M tasks based on a work procedure or their work plan. This procedure helps plant maintenance team prepare for plausible human errors. The procedure to be introduced is focusing on the recurrent error forms (or modes) in execution-based errors such as wrong object, omission, too little, and wrong action

  3. Conversion of a mainframe simulation for maintenance performance to a PC environment

    International Nuclear Information System (INIS)

    Gertman, D.I.

    1991-01-01

    A computer-based simulation capable of generating human error probabilities (HEPs) for maintenance activities is presented. The HEPs are suitable for use in probabilistic risk assessments (PRAs) and are an important source of information for data management systems such as NUCLARR- the Nuclear Computerized Library for Assessing Reactor Reliability. (1) The basic computer model MAPPS--the maintenance personnel performance simulation has been developed and validated by the US NRC in order to improve maintenance practices and procedures at nuclear power plants. This model validated previously, has now been implemented and improved, in a PC environment, and renamed MicroMAPPS. The model is stochastically based, able to simulate the performance of 2 to 15 person crews for a variety of maintenance conditions. These conditions include aspects of crew actions as potentially influenced by the task, the environment, or characteristics of the personnel involved. The nature of the software code makes it particularly appropriate for determining changes in HEP rates due to fluctuations in important task, environment,. or personnel parameters. The presentation presents a brief review of the mainframe version of the code and presents a summarization of the enhancements which dramatically change the nature of the human computer interaction

  4. Comparative analysis of genome maintenance genes in naked mole rat, mouse, and human

    NARCIS (Netherlands)

    S.L. Macrae (Sheila L.); Q. Zhang (Quanwei); C. Lemetre (Christophe); I. Seim (Inge); R.B. Calder (Robert B.); J.H.J. Hoeijmakers (Jan); Y. Suh (Yousin); V.N. Gladyshev (Vadim N.); A. Seluanov (Andrei); V. Gorbunova (Vera); J. Vijg (Jan); Z.D. Zhang (Zhengdong D.)

    2015-01-01

    textabstractGenome maintenance (GM) is an essential defense system against aging and cancer, as both are characterized by increased genome instability. Here, we compared the copy number variation and mutation rate of 518 GM-associated genes in the naked mole rat (NMR), mouse, and human genomes. GM

  5. Improving CANDU plant operation and maintenance through retrofit information technology systems

    International Nuclear Information System (INIS)

    Lupton, L. R.; Judd, R. A.

    1998-01-01

    CANDU plant owners are facing an increasingly competitive environment for the generation of electricity. To meet this challenge, all owners have identified that information technology offers opportunities for significant improvements in CANDU operation, maintenance and administration (OM and A) costs. Targeted information technology application areas include instrumentation and control, engineering, construction, operations and plant information management. These opportunities also pose challenges and issues that must be addressed if the full benefits of the advances in information technology are to be achieved. Key among these are system hardware and software maintenance, and obsolescence protection. AECL has been supporting CANDU stations with the initial development and evaluation of systems to improve plant performance and cost. Five key initiatives that have been implemented or are in the process of being implemented in some CANDU plants to achieve cooperational benefits include: critical safety parameter monitor system; advanced computerized annunciation system; plant historical data system; plant display system; and digital protection system. Each system will be described in terms of its role in enhancing current CANDU plant performance and how they will contribute to future CANDU plant performance. (author). 8 refs., 3 figs

  6. A multicriteria decision making approach applied to improving maintenance policies in healthcare organizations.

    Science.gov (United States)

    Carnero, María Carmen; Gómez, Andrés

    2016-04-23

    decision-making group. This approach is better suited to actual health care organization practice and depending on the subsystem analysed, improvements are introduced that are not included in normal maintenance policies; in this way, not only have different maintenance policies been suggested, but also alternatives that, in each case and according to viability, provide a more complete decision tool for the maintenance manager.

  7. Improvement of nuclear power plant operation and maintenance in Japan

    International Nuclear Information System (INIS)

    Kazushige Hamazaki

    1987-01-01

    Following the inauguration of commercial nuclear power generation in Japan in 1966, capacity factors were held in the relatively low level until around 1975 due to initial-period troubles. With subsequent improvement, however, capacity factors have climbed steadily and recently been sustaining more than 70%. To obtain this successful result, a various kind of improvement have been made not only for the operation management area but also for the maintenance management area in conjunction with the successive effort to reflect the operating experiences to the early stage design. Nowadays nuclear generation has assumed increasing importance for Japan's electrical power needs, and is making a great contribution to stabilizing power supply costs. (author)

  8. Management of remanent lifetime. Short-term benefits of the maintenance evaluation and improvement programme

    International Nuclear Information System (INIS)

    Sainero Garcia, J.

    1993-01-01

    Remanent Lifetime Management, which is scientifically based on knowing the degradatory phenomena associated with aging, today allows us to optimize plant life through a long-term maintenance strategy combining preventive maintenance and condition monitoring programmes. Within a project for Remanent Lifetime Management (RLM), the determination of methods of control and mitigation of degradations due to aging depends on the programme of Maintenance Evaluation and Improvement (MEI). This programme, underpinned by the analysis of degradatory phenomena to which plant components are subjected, evaluates current maintenance practices and defines the complementary actions which would facilitate establishment of a long-term strategy to control aging. Together with this main objective of the RLM project, the MEI programme achieves short-term benefits since, right from the beginning, it offers solutions to mitigate and guard against degradations in crucial plant components, and generally sets out a programme to control aging. The MEI programme further serves as a tool to reach the final objectives of the new 10CFR50.65 rule, 'Requirements for Maintenance Programs for NPPs'. The MEI always offers the option should the Utility Owner decide to extend plant life. (author)

  9. Environmental Assessment for Waterfront Facilities Maintenance and Improvements, Pearl Harbor Naval Complex, Oahu, Hawaii

    National Research Council Canada - National Science Library

    2005-01-01

    Commander, Navy Region Hawaii (CNRH) proposes to repair, maintain, and improve waterfront berthing and maintenance facilities for ships and submarines on an as-needed basis within the Pearl Harbor Naval Complex (PHNC...

  10. Information management in supply chain partnering : improving maintenance processes in Dutch housing associations

    NARCIS (Netherlands)

    Debby Goedknegt

    2017-01-01

    From the article: "Abstract Maintenance processes of Dutch housing associations are often still organized in a traditional manner. Contracts are based on lowest price instead of ‘best quality for lowest price’ considering users’ demands. Dutch housing associations acknowledge the need to improve

  11. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1999-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  12. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  13. Improvement of condition-based maintenance technology by utilization of thermography

    International Nuclear Information System (INIS)

    Shimada, Hiroki

    2004-01-01

    In the United States, condition-based maintenance technology comprising IR thermography (hereafter ''thermography'' for short) has been regarded in recent years as the established means for effectively improvement the performance of accident-preventive measures for nuclear power stations. As very few nuclear power plants in Japan have been utilizing the technology, measures for allowing power station personnel to use the technology with ease have been studied on an empirical basis. First, in view of improving the measuring efficiency to determine temperatures more accurately with a single measurement, principal factors affecting the measured temperature values have been analyzed. As a result, it has been found effective for accurate temperature measurement to make use of the table to radiation rates that have been determined for each facility coating specification by using a black body tape and to determine the measuring spot by avoiding rear heat sources (influence of reflection ratio) and background noise (influence of scattered light). Concurrently, as a result of determining the IR attenuation in the atmosphere, thermographic measurement has been found feasible without any significant attenuation as long as the distance is below 10 meters. Further, every power station facility (mainly electrical facilities) that is immune to thermography has been identified. These study results have been documented in the form of the ''Thermography Measurement Manual'' by also including in it the descriptions on abnormal thermal images and the judgment criteria at elevated temperatures that have been used in the United States. Based on these accomplishments, condition-based maintenance technology employing thermography has been applied to on-site investigation of nuclear power stations, and the effectiveness of thermography-aided accident-prevention has been demonstrated by detecting locally temperature rising spots of power cable joints. Moreover, with respect to maintenance

  14. A Simulation Model for Machine Efficiency Improvement Using Reliability Centered Maintenance: Case Study of Semiconductor Factory

    Directory of Open Access Journals (Sweden)

    Srisawat Supsomboon

    2014-01-01

    Full Text Available The purpose of this study was to increase the quality of product by focusing on the machine efficiency improvement. The principle of the reliability centered maintenance (RCM was applied to increase the machine reliability. The objective was to create preventive maintenance plan under reliability centered maintenance method and to reduce defects. The study target was set to reduce the Lead PPM for a test machine by simulating the proposed preventive maintenance plan. The simulation optimization approach based on evolutionary algorithms was employed for the preventive maintenance technique selection process to select the PM interval that gave the best total cost and Lead PPM values. The research methodology includes procedures such as following the priority of critical components in test machine, analyzing the damage and risk level by using Failure Mode and Effects Analysis (FMEA, calculating the suitable replacement period through reliability estimation, and optimizing the preventive maintenance plan. From the result of the study it is shown that the Lead PPM of test machine can be reduced. The cost of preventive maintenance, cost of good product, and cost of lost product were decreased.

  15. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  16. NOTCH-Mediated Maintenance and Expansion of Human Bone Marrow Stromal/Stem Cells: A Technology Designed for Orthopedic Regenerative Medicine.

    Science.gov (United States)

    Dong, Yufeng; Long, Teng; Wang, Cuicui; Mirando, Anthony J; Chen, Jianquan; O'Keefe, Regis J; Hilton, Matthew J

    2014-12-01

    Human bone marrow-derived stromal/stem cells (BMSCs) have great therapeutic potential for treating skeletal disease and facilitating skeletal repair, although maintaining their multipotency and expanding these cells ex vivo have proven difficult. Because most stem cell-based applications to skeletal regeneration and repair in the clinic would require large numbers of functional BMSCs, recent research has focused on methods for the appropriate selection, expansion, and maintenance of BMSC populations during long-term culture. We describe here a novel biological method that entails selection of human BMSCs based on NOTCH2 expression and activation of the NOTCH signaling pathway in cultured BMSCs via a tissue culture plate coated with recombinant human JAGGED1 (JAG1) ligand. We demonstrate that transient JAG1-mediated NOTCH signaling promotes human BMSC maintenance and expansion while increasing their skeletogenic differentiation capacity, both ex vivo and in vivo. This study is the first of its kind to describe a NOTCH-mediated methodology for the maintenance and expansion of human BMSCs and will serve as a platform for future clinical or translational studies aimed at skeletal regeneration and repair. ©AlphaMed Press.

  17. How and when will self-assessment improve maintenance of CANDU plants - evaluator's view

    International Nuclear Information System (INIS)

    Mika, K.

    1997-01-01

    Learning organizations use self-evaluation programs to compare their actual performance with their management's expectations and industry standards. In general, self-evaluations identify areas needing improvement. Self-evaluation activities in maintenance departments include self-assessments, management monitoring observations, root cause analyses, event investigations, benchmarking, use of operating experience, self-checking, and problem reporting systems. In Ontario Hydro Nuclear (OHN) we have used almost all forms of self-evaluation with mixed success. However, we did not use self-assessments. With emphasis on excellent maintenance this powerful form of self-evaluation is being introduced to all our plants. Because of its recency and relative inexperience with it, this paper is focused on self-assessment. The paper provides the author's perspective on how a self-assessment program would be evaluated by an independent internal evaluation and what attributes should be in place in order for maintenance departments to succeed in the implementation and successful continuation of the program. (author)

  18. Human-robot collaborative navigation for autonomous maintenance management of nuclear installation

    International Nuclear Information System (INIS)

    Nugroho, Djoko Hari

    2002-01-01

    Development of human and robot collaborative navigation for autonomous maintenance management of nuclear installation has been conducted. The human-robot collaborative system is performed using a switching command between autonomous navigation and manual navigation that incorporate a human intervention. The autonomous navigation path is conducted using a novel algorithm of MLG method based on Lozano-Perez s visibility graph. The MLG optimizes the shortest distance and safe constraints. While the manual navigation is performed using manual robot tele operation tools. Experiment in the MLG autonomous navigation system is conducted for six times with 3-D starting point and destination point coordinate variation. The experiment shows a good performance of autonomous robot maneuver to avoid collision with obstacle. The switching navigation is well interpreted using open or close command to RS-232C constructed using LabVIEW

  19. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  20. Spares management for improved maintenance

    International Nuclear Information System (INIS)

    Moncrief, E.C.; Schroder, R.M.

    1987-01-01

    A recent survey by the US Nuclear Regulatory Commission (NRC) of maintenance practices at US nuclear power plants confirms that spare parts availability is, to some extent, a problem at all but a few plants, and that 57% of the plants sometimes operated in a limiting condition for operation over the last year due to unavailability of spare parts. That's the bad news. The good news is that significant improvement is possible without ballooning inventory. The vast majority of total dollar value of spare parts inventory at power generation stations, whether nuclear or fossil, is rarely used (parts or components that are used 12 or less times per year including many with a history of no use for many years). Inventory Solutions of Akron, Ohio, has developed such a tool, called rarely used inventory stocking logic (RUSL) which is a user-friendly decision support tool for setting spare parts reorder points. Based on statistical computations enhanced to include the most advanced techniques developed for use in aerospace and military combat readiness, RUSL calculates the optimum stocking level to achieve the desired spare part availability at the station. In doing so, it considers the importance of the part in preventing an outage, as well as key economic ordering parameters, such as part cost, carrying cost, number of parts in service, historical observed usage, anticipated future usage, and lead time to replenish

  1. Digital maintenance field technology for the maintenance of nuclear power plant

    International Nuclear Information System (INIS)

    Sato, Tomomasa; Asama, Hajime; Kita, Nobuyuki; Numano, Masayoshi

    2002-01-01

    This paper proposes a concept of 'Digital Maintenance Field Technology', which enables human beings and working robots making fully use of the necessary information for maintenance activity not only in any location of the maintenance field (seamless in location) but also in any moment from the past to the future (seamless in time) and in any format in presenting to human (seamless in semantics). The paper points out the following three essential components of the technology: 1) 'Digital Field Construction Technology', 2) 'Digital Field Archival Technology' and 3) 'Digital Field Presentation Technology'. The necessary capabilities are extracted and our approaches and state of the art of realizing these capabilities are introduced in addition to present the state of the art of home application example. The future extension is also illustrated. (author)

  2. Implementation of Total Productive Maintenance (TPM to Improve Sheeter Machine Performance

    Directory of Open Access Journals (Sweden)

    Candra Nofri Eka

    2017-01-01

    Full Text Available This paper purpose is an evaluation of TPM implementation, as a case study at sheeter machine cut size line 5 finishing department, PT RAPP, Indonesia. Research methodology collected the Overall Equipment Effectiveness (OEE data of sheeter machine and computed its scores. Then, OEE analysis big losses, statistical analysis using SPSS 20 and focused maintenance evaluation of TPM were performed. The data collected to machine sheeter’s production for 10 months (January-October 2016. The data analyses was resulted the OEE average score of 82.75%. This score was still below the world class OEE (85% and the company target (90%. Based the big losses of OEE analysis was obtained the reduce speed losses, which most significant losses of OEE scores. The reduce speed losses value was 44.79% of total losses during the research period. The high score of these losses due to decreasing of machine production speed by operators, which intended to improve the quality of resulting products. The OEE scores statistical analysis was found breakdown losses and reduces speed losses, which significantly affected to OEE scores. Implementations of focused maintenance of TPM in the case study may need to improve because there were still occurred un-expecting losses during the research period.

  3. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  4. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  5. Research on gesture recognition of augmented reality maintenance guiding system based on improved SVM

    Science.gov (United States)

    Zhao, Shouwei; Zhang, Yong; Zhou, Bin; Ma, Dongxi

    2014-09-01

    Interaction is one of the key techniques of augmented reality (AR) maintenance guiding system. Because of the complexity of the maintenance guiding system's image background and the high dimensionality of gesture characteristics, the whole process of gesture recognition can be divided into three stages which are gesture segmentation, gesture characteristic feature modeling and trick recognition. In segmentation stage, for solving the misrecognition of skin-like region, a segmentation algorithm combing background mode and skin color to preclude some skin-like regions is adopted. In gesture characteristic feature modeling of image attributes stage, plenty of characteristic features are analyzed and acquired, such as structure characteristics, Hu invariant moments features and Fourier descriptor. In trick recognition stage, a classifier based on Support Vector Machine (SVM) is introduced into the augmented reality maintenance guiding process. SVM is a novel learning method based on statistical learning theory, processing academic foundation and excellent learning ability, having a lot of issues in machine learning area and special advantages in dealing with small samples, non-linear pattern recognition at high dimension. The gesture recognition of augmented reality maintenance guiding system is realized by SVM after the granulation of all the characteristic features. The experimental results of the simulation of number gesture recognition and its application in augmented reality maintenance guiding system show that the real-time performance and robustness of gesture recognition of AR maintenance guiding system can be greatly enhanced by improved SVM.

  6. Instrumentalization of eating improves weight loss maintenance in obesity

    DEFF Research Database (Denmark)

    Christensen, Bodil Just; Iepsen, Eva Pers Winning; Lundgren, Julie Rehné

    2017-01-01

    Aim: The purpose of this study was to identify psychosocial determinants for maintaining weight loss. Methods: 42 obese individuals who achieved a 12% weight loss before entering a 52-week weight maintenance program were interviewed qualitatively. Psychosocial factors related to weight loss...... weight loss maintenance was associated with an interplay between behavioral, affective and contextual changes. ‘Instrumentalization of eating behavior' seems to be an important element in long-term weight maintenance....

  7. An Improved Distribution Policy with a Maintenance Aspect for an Urban Logistic Problem

    Directory of Open Access Journals (Sweden)

    Nadia Ndhaief

    2017-07-01

    Full Text Available In this paper, we present an improved distribution plan supporting an urban distribution center (UDC to solve the last mile problem of urban freight. This is motivated by the need of UDCs to satisfy daily demand in time under a high service level in allocated urban areas. Moreover, these demands could not be satisfied in individual cases because the delivery rate can be less than daily demand and/or affected by random failure or maintenance actions of vehicles. The scope of our work is to focus on a UDC, which needs to satisfy demands in a finite horizon. To that end, we consider a distribution policy on two sequential plans, a distribution plan correlated to a maintenance plan using a subcontracting strategy with several potential urban distribution centers (UDCs and performing preventive maintenance to ensure deliveries for their allocated urban area. The choice of subcontractor will depend on distance, environmental and availability criteria. In doing so, we define a mathematical model for searching the best distribution and maintenance plans using a subcontracting strategy. Moreover, we consider delay for the next periods with an expensive penalty. Finally, we present a numerical example illustrating the benefits of our approach.

  8. The analysis of human error as causes in the maintenance of machines: a case study in mining companies

    Directory of Open Access Journals (Sweden)

    Kovacevic, Srdja

    2016-12-01

    Full Text Available This paper describes the two-step method used to analyse the factors and aspects influencing human error during the maintenance of mining machines. The first step is the cause-effect analysis, supported by brainstorming, where five factors and 21 aspects are identified. During the second step, the group fuzzy analytic hierarchy process is used to rank the identified factors and aspects. A case study is done on mining companies in Serbia. The key aspects are ranked according to an analysis that included experts who assess risks in mining companies (a maintenance engineer, a technologist, an ergonomist, a psychologist, and an organisational scientist. Failure to follow technical maintenance instructions, poor organisation of the training process, inadequate diagnostic equipment, and a lack of understanding of the work process are identified as the most important causes of human error.

  9. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  10. Instrumentalization of Eating Improves Weight Loss Maintenance in Obesity

    Directory of Open Access Journals (Sweden)

    Bodil Just Christensen

    2017-12-01

    Full Text Available Aim: The purpose of this study was to identify psychosocial determinants for maintaining weight loss. Methods: 42 obese individuals who achieved a 12% weight loss before entering a 52-week weight maintenance program were interviewed qualitatively. Psychosocial factors related to weight loss maintenance were identified in two contrasting groups: weight reducers and weight regainers. Groups were defined by health-relevant weight maintenance (additional weight loss > 3% at week 52, n = 9 versus weight gain > 3%, at week 52, n = 20. Results: Weight reducers reported structured meal patterns (p = 0.008, no comfort eating (p = 0.016 and less psychosocial stress (p = 0.04 compared to weight regainers. The ability to instrumentalize eating behavior emerged as an important factor (p = 0.007. Nutritional knowledge, motivation or exercise level did not differ between groups (p > 0.05. Conclusions: Successful weight loss maintenance was associated with an interplay between behavioral, affective and contextual changes. ‘Instrumentalization of eating behavior' seems to be an important element in long-term weight maintenance.

  11. Improving Minuteman III Maintenance Concepts

    Science.gov (United States)

    2017-03-23

    the ground . Then figure out what your challenges are. We’ll have those” (Pappalardo, 2011). Another challenge facing the maintenance personnel...as assets aged as indicated by the pattern ‘B’ shown in Figure 2. With the increase in the mechanization of processes, more attention has been...concepts could be applied to the sustainment of the MM III as well as benefit its planned replacement, the Ground Based Strategic Deterrent (GBDS

  12. Improving maintenance of lost weight following a commercial liquid meal replacement program: a preliminary study.

    Science.gov (United States)

    Ames, Gretchen E; Patel, Roshni H; McMullen, Jillian S; Thomas, Colleen S; Crook, Julia E; Lynch, Scott A; Lutes, Lesley D

    2014-01-01

    Clinic-based liquid meal replacement (800kcals/day) programs produce substantial weight loss. Nevertheless, long-term maintenance remains a challenge. A limitation of maintenance programs is that they continue to promote large behavior changes that are initially required to induce weight loss which may be unsustainable long-term. The study aims were to conduct a preliminary assessment of the feasibility, acceptability, and effectiveness of a small changes maintenance intervention (SCM) for 30 patients who completed liquid meal replacement program (LMR). The 20-session SCM delivered over 52 weeks offered no preset goals for maintenance behaviors and all changes in behavior were self-selected. Participants had a median BMI of 40.9 kg/m(2) and weight of 111 kg at the start of LMR. At LMR completion, they lost 18% (21 kg) of body weight. The SCM was completed by 22 patients (73%); 19 completers (86%) attended ≥ 17 of 20 sessions with a median satisfaction rating of 9 (on a scale of 1 to 9). Completers were asked to record self-selected maintenance behaviors daily (median 351 days recorded). The most commonly reported daily behaviors were self-weighing, use of meal replacements and step counting. Median percent regain at week 52 was 14% (2.8 kg) of lost weight (range, -42 to 74%), significantly less than a median of 56% (11 kg) percent regain of lost weight (range, -78 to 110%) in a demographically similar historical control group with no maintenance intervention after LMR completion (P<0.001). Thus, SCM holds promise for improving weight maintenance. Future research should compare SCM to standard maintenance programs that promote large program-directed changes. © 2013.

  13. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  14. Human factors in maintenance: Development and research in Swedish nuclear power plants

    International Nuclear Information System (INIS)

    Salo, I.; Svensson, Ola

    2001-11-01

    The present report investigated previously completed, ongoing, and planned research and development projects focusing human factors and maintenance work carried out at Swedish nuclear power plants and SKI. In addition, needs for future research and development works were also investigated. Participants from all nuclear power plants and SKI were included in the study. Participants responded to a set of questions in an interview. The interviews also generated a list of future research and development projects

  15. Human factors in maintenance: development and research in Swedish nuclear power plants

    International Nuclear Information System (INIS)

    Salo, I.; Svenson, O.

    2001-11-01

    The report investigated previously completed, ongoing, and planned research and development projects focusing human factors and maintenance work carried out at Swedish nuclear power plants and SKI. In addition, needs for future research and development works were also investigated. Participants from all nuclear power plants and SKI were included in the study. Participants responded to a set of questions in an interview. The interviews also generated a list of future research and development projects. (au)

  16. Human factors in maintenance: Development and research in Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Salo, I. [Lund Univ. (Sweden). Dept. of Psychology; Svensson, Ola [Stockholm Univ. (Sweden). Dept. of Psychology

    2001-11-01

    The present report investigated previously completed, ongoing, and planned research and development projects focusing human factors and maintenance work carried out at Swedish nuclear power plants and SKI. In addition, needs for future research and development works were also investigated. Participants from all nuclear power plants and SKI were included in the study. Participants responded to a set of questions in an interview. The interviews also generated a list of future research and development projects.

  17. Development of a daily maintenance work management system for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshimura, Sadanori; Maita, Keikichi; Ogawa, Koutaro; Tabata, Nobuyuki; Shibuya, Shinya

    1999-01-01

    Maintenance work plays an important role in keeping the safety and reliability of nuclear power plants. Especially, with the recent trends of reducing the outage length, safe and reliable execution of maintenance work is more earnestly required than ever. Taking this situation into account, a daily maintenance work management system has been developed to support the execution of maintenance work for nuclear power plants. This system supports maintenance personnel in writing and approving the daily work instruction sheet and reduces their workload by providing predetermined lists of items necessary for filling up the sheet and by applying an electronic approval procedure. It also provides information through a computer network to improve the communication among maintenance personnel. For work steps to be treated in the daily work instruction sheet, an analysis was made to identify potential human errors and related counter measures, which were then linked to safety and quality assurance instructions of the sheet. Based on this information, the system automatically presents the safety and quality assurance instructions related to the work content listed in the sheet to improve the appropriateness of the instructions. A prototype of the daily maintenance work management system was developed and a trial use was made for actual periodic maintenance work at a nuclear power plant. This experience shows the usefulness of the system in reducing the workload of maintenance personnel and in providing safer work instructions. (author)

  18. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  19. Impact of improved operation and maintenance on cohesive sediment transport in Gezira Scheme, Sudan

    NARCIS (Netherlands)

    Osman, I.S.E.

    2015-01-01

    Summary

    Efficient operation and maintenance of irrigation schemes are needed for improving the hydraulic performance of the canals, enhancing the crop yields and insuring sustainable production. There is a great need to enhance the researches and for a variety of tools such as

  20. Advances in safety related maintenance

    International Nuclear Information System (INIS)

    2000-03-01

    The maintenance of systems, structures and components in nuclear power plants (NPPs) plays an important role in assuring their safe and reliable operation. Worldwide, NPP maintenance managers are seeking to reduce overall maintenance costs while maintaining or improving the levels of safety and reliability. Thus, the issue of NPP maintenance is one of the most challenging aspects of nuclear power generation. There is a direct relation between safety and maintenance. While maintenance alone (apart from modifications) will not make a plant safer than its original design, deficient maintenance may result in either an increased number of transients and challenges to safety systems or reduced reliability and availability of safety systems. The confidence that NPP structures, systems and components will function as designed is ultimately based on programmes which monitor both their reliability and availability to perform their intended safety function. Because of this, approaches to monitor the effectiveness of maintenance are also necessary. An effective maintenance programme ensures that there is a balance between the improvement in component reliability to be achieved and the loss of component function due to maintenance downtime. This implies that the safety level of an NPP should not be adversely affected by maintenance performed during operation. The nuclear industry widely acknowledges the importance of maintenance in NPP safety and operation and therefore devotes great efforts to develop techniques, methods and tools to aid in maintenance planning, follow-up and optimization, and in assuring the effectiveness of maintenance

  1. PORTFOLIO OF POTENTIAL STRATEGIES IN AERONAUTIC MAINTENANCE

    International Nuclear Information System (INIS)

    Rolet, S.

    2010-01-01

    EADS divisions aim more and more at developing services associated to their platforms. EADS divisions, like Airbus and Eurocopter, are investigating on services associated to their platforms in order to add them value. One possible service consists in structural maintenance operation assistance, especially for NDT operations performed by the customer. EADS Innovation Works envisages three different and complementary enhanced structural maintenance categories. Enhanced NDT improves standard NDT operation environment. This is made possible by the existence of 'smart' NDT tools that are computer based and therefore able to support other functions. These functions range from local smart data processing and display to remote expert assisted operation. Passive Sensor Network relies on sensors permanently installed on aircraft structure. Interrogation of sensors is performed on ground and off line (while structure is not loaded except by its own weight). It can be done at arbitrary times in order to determine structure health. The aim is to give easy access to some hidden ''hot spots,'' to reduce human factor in structure health assessment and optimize maintenance. Structural Health Monitoring goes a step beyond Passive Sensor Network, because interrogation units are on board the aircraft and may be connected to aircraft network. It allows to use on-line techniques such as adapted acoustic emission and to automatically raise an alarm when a defect appears in the structure. This paper presents these different ways of improving structural maintenance operations in service, with their respective advantages and limitations.

  2. The maintenance management for lean organization

    Directory of Open Access Journals (Sweden)

    Daniel D. GEORGESCU

    2010-12-01

    Full Text Available The goal of lean maintenance approach is to maintain organization international competitiveness. In the spirit of continuously improvement, in the paper it is shown how by adjusting some Lean manufacturing specific techniques for Total Productive Maintenance (TPM system, was born new maintenance system named Lean TPM. This is a systemic approach with three techniques, which don’t exclude specific techniques of TPM pillars, but complete them: the 7Ss as a critical first step in any improvement program; instantaneous maintenance; improvement setup operations. In the spirit of Lean principle, Lean TPM adjusts overall equipment effectiveness concept for all supply-chain from supplier to customer. Maintaining equipment in its optimal state and continually improving its productivity is the whole strategy behind Lean TPM.

  3. Improving Maintenance Data Collection Via Point-Of-Maintenance (POMX) Implementation

    Science.gov (United States)

    2006-03-01

    accurate documentation, (3) identifying and correcting the root causes for poor data integrity, and (4) educating the unit on the critical need for data ...the validity of the results. The data in this study were analyzed using the SAS JMP 6.0 statistical software package. The results for the tests...traditional keyboard data entry methods at a computer terminal. These terminals are typically located in the aircraft maintenance unit (AMU) facility , away

  4. System reliability as perceived by maintenance personnel on petroleum production facilities

    International Nuclear Information System (INIS)

    Antonovsky, A.; Pollock, C.; Straker, L.

    2016-01-01

    The aim of this research was to understand the relationship between maintenance staff perceptions of organisational effectiveness and operational reliability in petroleum operations. Engineering measures exist that assess the effectiveness of maintenance and reliability of equipment. These measures are typically retrospective and may not provide insight into what impedes system reliability. Perceptions of organisational effectiveness by the workforce may provide a predictive measure that could improve our understanding of the human factors that influence system reliability. Maintenance personnel (n=133) from nine petroleum production facilities completed a survey as part of a study of human factors and maintenance reliability. 69 respondents (51.9%) provided comments to an open-ended question in the survey, and these data were analysed using Interpretive Phenomenological Analysis to extract themes. Four super-ordinate themes were identified from the analysis: 1) Communication and access to information, 2) Efficiency of current work systems, 3) Need for better workgroup support, and 4) Management impacts on the workplace. We found a significant relationship between the frequency of the four super-ordinate themes and the facility reliability level as measured by ‘Mean Time Between Failures’: χ"2(6,N=158)=16.2, p=.013. These results demonstrated that operational effectiveness might be differentiated on the basis of survey-derived perceptions of maintenance personnel. - Highlights: • Thematic analysis of survey comments provided insights into workplace reliability • Worker’s comments on reliability related to technical data on time between failures • Management decision-making was the main theme in the lower reliability workplaces • Improving efficiency was the main theme in the higher reliability workplaces • Communication and better workgroup support were themes at all reliability levels

  5. Skeletal muscle structural lipids improve during weight-maintenance after a very low calorie dietary intervention

    DEFF Research Database (Denmark)

    Haugaard, Steen B; Vaag, Allan; Mu, Huiling

    2009-01-01

    -guided 24-weeks weight-maintenance program (-1.2 +/- 1.5 kg, P = ns). SMPL FA composition was determined by gas liquid chromatography. During the preceding VLCD, insulin sensitivity (HOMA-IR) and glycemic control (HbA1c) improved but no change in SMPL omega-3 FA was observed. During the weight......-maintenance program five subjects received the pancreas lipase inhibitor Orlistat 120 mg t.i.d. versus placebo. RESULTS: HOMA-IR and HbA1c stabilized and SMPL total omega-3 FA, docosahexaenoic acid and ratio of n-3/n-6 polyunsaturated FA increased by 24% (P

  6. Proceedings of the CIM maintenance engineering/mine operators' conference; Comptes rendus du colloque de ICM sur l'ingenierie de maintenance et l'exploitation miniere

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This conference provided a forum to exchange knowledge and best practices that apply to to modern underground mining. It highlighted the synergy and co-operation that is essential for successful operations and maintenance practices. Solutions to mitigate increasing ventilation costs were presented along with possible alternatives to diesel powered equipment in order to maintain air quality at a level that is acceptable for human workers. The themes for the technical program were innovation and performance improvement; maintenance, and mining. The sessions were entitled: deep mining; environment; mining best practices; ground control; energy efficiency; research and development in mining; mining methods; narrow-vein mining; innovative equipment; predictive maintenance; research and development in maintenance; and, planning and scheduling. The conference featured 24 presentations, of which 5 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  7. Elimination of maintenance outage and cost reduction by development of outage-free maintenance techniques

    International Nuclear Information System (INIS)

    Jakabe, Hideo; Maruyama, Yoshinaga

    1996-01-01

    The development program of KEPCO on outage-free maintenance techniques for distribution line work since 1984 is overviewed. It has succeeded in eliminating maintenance outages since 1989. The original aim was to improve customer satisfaction. However, in all, four benefits were realised through the development. These are cost reduction, securing of worker safety, improvement of customer service, and advancement of distribution techniques and morale in KEPCO. The introduction of robotic techniques for maintenance work and manipulator techniques for repair work is planned for further modernization. These new techniques are helping in both work safety and work efficiency improvement. Cost reduction and advancement of distribution line work techniques is also considered. (R.P.)

  8. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  9. Managing railcar maintenance : a primer on practices and improvement opportunities for the U.S. transit industry.

    Science.gov (United States)

    2013-09-01

    This report surveys the state-of-practice of transit railcar maintenance management and fleet management practices. It emphasizes a lifecycle management approach to fleet management. It also emphasizes the role of performance improvement programs and...

  10. Human Resources Training Requirement on NPP Operation and Maintenance

    International Nuclear Information System (INIS)

    Nurlaila; Yuliastuti

    2009-01-01

    This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the nonnuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates. (author)

  11. South Blackwater Coal`s maintenance program

    Energy Technology Data Exchange (ETDEWEB)

    Nash, J. [South Blackwater Coal Limited, Blackwater, Qld. (Australia)

    1998-09-01

    The South Blackwater operation consists of two opencut mining areas and two underground mines (Laleham and Kenmure) near Blackwater in central Queensland, all of which supply coal to a central coal preparation plant. South Blackwater Coal Ltd. recently developed a maintenance improvement programme, described in this article. The programme involved implementation systems of key performance indicators (KPIs), benchmaking, condition monitoring, work planning and control, failure analysis and maintenance audit. Some improvements became almost immediately apparent, others were quite gradual. Major results included: improved availability (and reliability) of all opencast fleets, improvements in rear dump availability; reduced maintenance man-hours for opencast fleets; and increased availability of the coal handling and preparation plant. The paper is an edited version of that presented at the `Maintenance in mining conference` 16-19 March 1998, held in Bali, Indonesia. 4 figs., 2 photos.

  12. PROBING GENOME MAINTENANCE FUNCTIONS OF HUMAN RECQ1

    Directory of Open Access Journals (Sweden)

    Furqan Sami

    2013-03-01

    Full Text Available The RecQ helicases are a highly conserved family of DNA-unwinding enzymes that play key roles in protecting the genome stability in all kingdoms of life.'Human RecQ homologs include RECQ1, BLM, WRN, RECQ4, and RECQ5β.'Although the individual RecQ-related diseases are characterized by a variety of clinical features encompassing growth defects (Bloom Syndrome and Rothmund Thomson Syndrome to premature aging (Werner Syndrome, all these patients have a high risk of cancer predisposition.'Here, we present an overview of recent progress towards elucidating functions of RECQ1 helicase, the most abundant but poorly characterized RecQ homolog in humans.'Consistent with a conserved role in genome stability maintenance, deficiency of RECQ1 results in elevated frequency of spontaneous sister chromatid exchanges, chromosomal instability, increased DNA damage and greater sensitivity to certain genotoxic stress.'Delineating what aspects of RECQ1 catalytic functions contribute to the observed cellular phenotypes, and how this is regulated is critical to establish its biological functions in DNA metabolism.'Recent studies have identified functional specialization of RECQ1 in DNA repair; however, identification of fundamental similarities will be just as critical in developing a unifying theme for RecQ actions, allowing the functions revealed from studying one homolog to be extrapolated and generalized to other RecQ homologs.

  13. Probabilistic analysis of free ways for maintenance

    International Nuclear Information System (INIS)

    Torres V, A.; Rivero O, J.J.

    2004-01-01

    The safety during the maintenance interventions is treated in limited manner and in general independent of the systems of management of the maintenance. This variable is affected by multiple technical or human factors many times subjective and difficult to quantifying, what limits the design of preventive plans. However, some factors constitute common points: the isolation configurations during the free ways (bank drafts in the oil industry) and the human errors associated to their violation. This characteristic allowed to develop the analysis of such situations through the methodology of fault trees that it links faults of teams and human errors cohesively. The methodology has been automated inside the MOSEG Win Ver 1.0 code and the same one can embrace from the analysis of a particular situation of free way until that of a complete strategy of maintenance from the point of view of the safety of the maintenance personal. (Author)

  14. A development of maintenance educational support method by using navigation method Pt. 4. A development of a paper prototype system for the RHR pump maintenance educational support

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo; Tsumura, Joji

    2004-01-01

    This research establishes the new maintenance educational support prototype system for aiming at organization as Trinity (a supervision person, a construction person in charge, a work person in charge, and group length), and improvement in human reliability for the purpose of aiming at before hand prevention of a systematic error, human error, and the accident and a trouble. (1) This maintenance educational support: system made educational start to the educational end the structure navigated exactly, carrying out the exchange with a data base along with the road map which divided action (act) of the work process and worker concerning RHR pump maintenance work for a participant etc. by class. (2) First, according to a participant's attribute, this educational support system performs educational support (a question and reply) concerning an organization and organization, and judges knowledge and a nature type based on the result. Furthermore, educational support (a question and reply) concerning maintenance work is performed, and a knowledge level is judged based on the result. And it considered as the structure which performs the comprehensive judgment about an organization, organization, and the educational effect concerning maintenance work at the last. (3) The judgment pattern of the knowledge and nature after the educational support end concerning a participant's organization and organization was made into four kinds which consist of (1) organization priority and duty A type, (2) organization priority and an adaptable type, (3) individual priority and an adaptable type, and (4) individual priority and a duty priority type. (4) The judgment pattern of the knowledge level after the educational support end concerning maintenance work of a participant was used as three kinds of evaluation axes, schedule management, apparatus reliability capability, and human-being reliability. (author)

  15. How and when will self-assessment improve maintenance of CANDU plants - evaluator's view

    Energy Technology Data Exchange (ETDEWEB)

    Mika, K. [Ontario Hydro. Bruce Nuclear Station. Tiverton, ON (Canada)

    1997-07-01

    Learning organizations use self-evaluation programs to compare their actual performance with their management's expectations and industry standards. In general, self-evaluations identify areas needing improvement. Self-evaluation activities in maintenance departments include self-assessments, management monitoring observations, root cause analyses, event investigations, benchmarking, use of operating experience, self-checking, and problem reporting systems. In Ontario Hydro Nuclear (OHN) we have used almost all forms of self-evaluation with mixed success. However, we did not use self-assessments. With emphasis on excellent maintenance this powerful form of self-evaluation is being introduced to all our plants. Because of its recency and relative inexperience with it, this paper is focused on self-assessment. The paper provides the author's perspective on how a self-assessment program would be evaluated by an independent internal evaluation and what attributes should be in place in order for maintenance departments to succeed in the implementation and successful continuation of the program. (author)

  16. Mobile robotics for CANDU reactor maintenance: case studies and near-term improvements

    International Nuclear Information System (INIS)

    Lipsett, M. G.; Rody, K.H.

    1995-01-01

    Although robotics researchers have been promising that robotics would soon be performing tasks in hazardous environments, the reality has yet to live up to the hype. The presently available crop of robots suitable for deployment in industrial situations are remotely operated, requiring skilled users. This talk describes cases where mobile robots have been used successfully in CANDU stations, discusses the difficulties in using mobile robots for reactor maintenance, and provides near-term goals for achievable improvements in performance and usefulness. (author)

  17. Prototyping visual interface for maintenance and supply databases

    OpenAIRE

    Fore, Henry Ray

    1989-01-01

    Approved for public release; distribution is unlimited This research examined the feasibility of providing a visual interface to standard Army Management Information Systems at the unit level. The potential of improving the Human-Machine Interface of unit level maintenance and supply software, such as ULLS (Unit Level Logistics System), is very attractive. A prototype was implemented in GLAD (Graphics Language for Database). GLAD is a graphics object-oriented environment for databases t...

  18. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  19. Proactive maintenance initiatives at Argonne National Laboratory-West

    International Nuclear Information System (INIS)

    Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

    1995-01-01

    In the late 1980's, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ''mentor'' roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I ampersand C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned

  20. Teacher Evaluation: Organizational Maintenance Versus Stimulation of Improved Teaching Performance. The New Mexico Principalship Study.

    Science.gov (United States)

    Wood, Carolyn J.; Pohland, Paul A.

    Teacher evaluation procedures appear to focus on organizational maintenance aspects more heavily than on helping teachers improve their teaching performance. This conclusion was reached after a content analysis of teacher evaluation instruments used in New Mexico schools. Items focusing on the instructional role constituted only 28% of the items…

  1. JIT maintenance improves the productivity and energy efficiency of the system

    Directory of Open Access Journals (Sweden)

    Marković Željko M.

    2016-01-01

    Full Text Available Maintenance planning in order to ensure the smooth functioning of the system, optimal interaction of system with the environment, and timely responses to the set requirements is one of the most important internal resources of the organization. Just-In-Time Maintenance enables rarely downtime and lower maintenance costs throughout the life cycle of the system, and dramatically increases the productivity and energy efficiency of the entire system. By adopting of the Just-In-Time Maintenance philosophy, minimum of objective function of energy or production system, as well as of production of services system, is achieved.

  2. Building Maintenance Management System for Heritage Museum

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2012-09-01

    Full Text Available An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, category, location, and ownership. This study focuses on Building Maintenance Management System for Heritage Museum, which consists of two case studies in Penang State Museum and Art Gallery, Malaysia and Museum of Perak, Malaysia. The aim of this study is to propose methods to improve the maintenance management system for heritage museum. From the results, the common problem occurs during the implementation for the maintenance of each building is the budget for the maintenance and worker’s skill. The department of each museum must have their own maintenance unit to keep an eye on the maintenance activities for their buildings in order to improve the maintenance management system in their building.

  3. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  4. The human CTC1/STN1/TEN1 complex regulates telomere maintenance in ALT cancer cells

    Energy Technology Data Exchange (ETDEWEB)

    Huang, Chenhui; Jia, Pingping; Chastain, Megan; Shiva, Olga; Chai, Weihang, E-mail: wchai@wsu.edu

    2017-06-15

    Maintaining functional telomeres is important for long-term proliferation of cells. About 15% of cancer cells are telomerase-negative and activate the alternative-lengthening of telomeres (ALT) pathway to maintain their telomeres. Recent studies have shown that the human CTC1/STN1/TEN1 complex (CST) plays a multi-faceted role in telomere maintenance in telomerase-expressing cancer cells. However, the role of CST in telomere maintenance in ALT cells is unclear. Here, we report that human CST forms a functional complex localizing in the ALT-associated PML bodies (APBs) in ALT cells throughout the cell cycle. Suppression of CST induces telomere instabilities including telomere fragility and elevates telomeric DNA recombination, leading to telomere dysfunction. In addition, CST deficiency significantly diminishes the abundance of extrachromosomal circular telomere DNA known as C-circles and t-circles. Suppression of CST also results in multinucleation in ALT cells and impairs cell proliferation. Our findings imply that the CST complex plays an important role in regulating telomere maintenance in ALT cells. - Highlights: • CST localizes at telomeres and ALT-associated PML bodies in ALT cells throughout the cell cycle. • CST is important for promoting telomeric DNA replication in ALT cells. • CST deficiency decreases ECTR formation and increases T-SCE. • CST deficiency impairs ALT cell proliferation and results in multinucleation.

  5. Data management in maintenance outsourcing

    International Nuclear Information System (INIS)

    Murthy, D.N.P.; Karim, M.R.; Ahmadi, A.

    2015-01-01

    Most businesses view maintenance as tasks carried out by technicians and the data collected is mostly cost related. There is a growing trend towards outsourcing of maintenance and the data collection issues are not addressed properly in most maintenance service contracts. Effective maintenance management requires proper data management - data collection and analysis for decision-making. This requires a proper framework and when maintenance is outsourced it raises several issues and challenges. The paper develops a framework for data management when maintenance is outsourced and looks at a real case study that highlights the need for proper data management. - Highlights: • Framework for data management in maintenance outsourcing. • Black-box to grey-box approaches for modelling. • Improvements to maintenance decision-making. • Case study to illustrate the approaches and the shortcomings in data collection

  6. Using risk-informed asset management for feedwater system preventative maintenance optimization

    International Nuclear Information System (INIS)

    Kee, Ernest; Sun, Alice; Richards, Andrew; Grantom, Rick; Liming, James; Salter, James

    2004-01-01

    The initial development of a South Texas Project Nuclear Operating Company process for supporting preventative maintenance optimization by applying the Balance-Of-Plant model and Risk-Informed Asset Management alpha-level software applications is presented. Preventative maintenance activities are evaluated in the South Texas Project Risk-Informed Asset Management software while the plant maintains or improves upon high levels of nuclear safety. In the Balance-Of-Plant availability application, the level of detail in the feedwater system is enhanced to support plant decision-making at the component failure mode and human error mode level of indenture by elaborating on the current model at the super-component level of indenture. The enhanced model and modeling techniques are presented. Results of case studies in feedwater system preventative maintenance optimization sing plant-specific data are also presented. (author)

  7. An experimental study on the effect of noise and sleep loss on human performance using the measure of TCI during NPP maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Jo, Hyun Jun

    2008-02-15

    There are various stressors in NPP maintenance, such as environmental stressors and work-related stressors. These stressors degrade human performance and increase human error. Stress has not been largely considered as a factor of human error in root cause analyses. Recently, however, regulatory bodies and research institutes have worked to manage the physical condition of the operator and improve the environment and methods of NPP maintenance. These efforts have focused on reducing the incidence of human error due to stress. It is necessary to study how much stress affects human performance before these efforts are complete. The objectives of the present study are to formulate a Task Concentration Index (TCI) based on Electrocardiogram (ECG) signals in order to evaluate the degree to which a person concentrates on a task experimentally. With the TCI, the study will also evaluate the effects of noise and sleep loss on human performance during NPP maintenance tasks. Stress influences the efficiency of information processing and data input and output. Stress and human error are tightly linked in a closed-loop combination. The human body responds to stress by activating the nervous system and specific hormones. Therefore, physiological signals are changed by stress. A spectral analysis of Heart Rate Variability (HRV) provides a noninvasive technique for indirectly measuring sympathetic and parasympathetic modulation during specific tasks. The high-frequency component (HF, 0.15∼0.4Hz) reflects momentary respiration and is mediated by the parasympathetic nervous system. The low-frequency component (LF, 0.04∼0.15Hz) has been interpreted mainly as an indicator of sympathetic influences (especially when expressed in normalized units). When the level of stress is high, the Normalized Low Frequency component (NoLF) of HRV signals is generally higher than the normal state. The difference in NoLF readings between a normal state and during a task could be used to evaluate

  8. An experimental study on the effect of noise and sleep loss on human performance using the measure of TCI during NPP maintenance

    International Nuclear Information System (INIS)

    Jo, Hyun Jun

    2008-02-01

    There are various stressors in NPP maintenance, such as environmental stressors and work-related stressors. These stressors degrade human performance and increase human error. Stress has not been largely considered as a factor of human error in root cause analyses. Recently, however, regulatory bodies and research institutes have worked to manage the physical condition of the operator and improve the environment and methods of NPP maintenance. These efforts have focused on reducing the incidence of human error due to stress. It is necessary to study how much stress affects human performance before these efforts are complete. The objectives of the present study are to formulate a Task Concentration Index (TCI) based on Electrocardiogram (ECG) signals in order to evaluate the degree to which a person concentrates on a task experimentally. With the TCI, the study will also evaluate the effects of noise and sleep loss on human performance during NPP maintenance tasks. Stress influences the efficiency of information processing and data input and output. Stress and human error are tightly linked in a closed-loop combination. The human body responds to stress by activating the nervous system and specific hormones. Therefore, physiological signals are changed by stress. A spectral analysis of Heart Rate Variability (HRV) provides a noninvasive technique for indirectly measuring sympathetic and parasympathetic modulation during specific tasks. The high-frequency component (HF, 0.15∼0.4Hz) reflects momentary respiration and is mediated by the parasympathetic nervous system. The low-frequency component (LF, 0.04∼0.15Hz) has been interpreted mainly as an indicator of sympathetic influences (especially when expressed in normalized units). When the level of stress is high, the Normalized Low Frequency component (NoLF) of HRV signals is generally higher than the normal state. The difference in NoLF readings between a normal state and during a task could be used to evaluate

  9. PSA Model Improvement Using Maintenance Rule Function Mapping

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Mi Ro [KHNP-CRI, Nuclear Safety Laboratory, Daejeon (Korea, Republic of)

    2011-10-15

    The Maintenance Rule (MR) program, in nature, is a performance-based program. Therefore, the risk information derived from the Probabilistic Safety Assessment model is introduced into the MR program during the Safety Significance determination and Performance Criteria selection processes. However, this process also facilitates the determination of the vulnerabilities in currently utilized PSA models and offers means of improving them. To find vulnerabilities in an existing PSA model, an initial review determines whether the safety-related MR functions are included in the PSA model. Because safety-related MR functions are related to accident prevention and mitigation, it is generally necessary for them to be included in the PSA model. In the process of determining the safety significance of each functions, quantitative risk importance levels are determined through a process known as PSA model basic event mapping to MR functions. During this process, it is common for some inadequate and overlooked models to be uncovered. In this paper, the PSA model and the MR program of Wolsong Unit 1 were used as references

  10. An experimental maintenance management system.

    Science.gov (United States)

    1979-01-01

    The purpose of this study was to evaluate Virginia's maintenance management system and to recommend modifications directed at improving it. The study revealed that (1) the current system of allocating maintenance monies is based upon centerline milea...

  11. Residual life management. Maintenance improvement; Gestion de vida remanente. Mejora del mantenimiento

    Energy Technology Data Exchange (ETDEWEB)

    Sainero Garcia, J; Hevia Ruperez, F

    1996-12-31

    The terms Residual Life Management, Life Cycle Management and Long-Term Management are synonymous with a concept which aims to establish efficient maintenance for the profitable and safe operation of a power plant for as long as possible. A Residual Life Management programme comprises a number of stages, of which Maintenance Evaluation focuses on how power plant maintenance practices allow the mitigation and control of component ageing. with this objective in mind, a methodology has been developed for the analysis of potential degradative phenomena acting on critical components in terms of normal power plant maintenance practices. This methodology applied to maintenance evaluation enables the setting out of a maintenance programme based on the Life Management concept, and the programme`s subsequent up-dating to allow for new techniques and methods. Initial applications have shown that although, in general terms, power plant maintenance is efficient, the way in which Residual Life Management is approached requires changes in maintenance practices. These changes range from modifications to existing inspection and surveillance methods or the establishment of new ones, to the monitoring of trends or the performance of additional studies, the purpose of which is to provide an accurate evaluation of the condition of the installations and the possibility of life extension. (Author)

  12. Energeia of maintenance. Knowledge resource maintenance and creation of new value

    International Nuclear Information System (INIS)

    Iwata, Shuichi

    2011-01-01

    After the Fukushima accident occurred in March 2011, the intellectual energeia of maintenology (motive force of implementation) - 'arrow of information' - could be obtained by trying to establish academic agenda from uniting 'arrow of time' and 'arrow of entropy' based on historical review and then dividing characteristics of maintenance objects needed from society in the future, into content, context and measures in order to overcome this chaos. Looking at contaminated area map around Chernobyl and comparing state of Ukraine elapsed 25 years after Chernobyl accident with that of Fukushima in great social anxiety at present, various 'arrow of information' could be enumerated such as (1) openness of content of accident information and evaluation of context, (2) safety and stability of social society, (3) perfect individual's care and human right for knowing risk, (4) data literacy, (5) various risks, (6) data dissemination and (7) utilization of outsider's view. Knowledge maintenology should be expanded in the area such as (1) preservation of global environment and maintenology, (2) problem of contaminated area with radioactive materials: data science and maintenology, (3) maintenance of large artificial product: experimental science, theoretical science, computational science and maintenology, (4) maintenance of knowledge related with events having complicated causality: design science responding to various risks. As for utilization of nuclear energy, maintenance technology, which shall balance its benefit and risk of society and establish science needed for security of all human being -a raison d'etre and energeia of maintenology-, should be considered for upper structure about global energy, environment, economics and politics (including military affairs) and human society, not for respective energy system in specific country or organization. Fundamentals of energeia of maintenology shall be implemented in the same spirit of 'Yui', small mutual aid organization

  13. Maintenance Mentor

    National Research Council Canada - National Science Library

    Jacobs, John

    2003-01-01

    Maintenance Mentor (MXM) is a research effort conducted by a joint AFRL/HESR and Northrop Grumman Information Technology team to identify the basic, high-level requirements necessary for improving flight line diagnostic capabilities...

  14. Proceedings of the fourth international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1997-01-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance

  15. Proceedings of the fourth international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance.

  16. A randomized trial using motivational interviewing for maintenance of blood pressure improvements in a community-engaged lifestyle intervention: HUB city steps

    Science.gov (United States)

    Landry, Alicia; Madson, Michael; Thomson, Jessica; Zoellner, Jamie; Connell, Carol; Yadrick, Kathleen

    2015-01-01

    Little is known about the effective dose of motivational interviewing for maintaining intervention-induced health outcome improvements. The purpose of this study was to compare effects of two doses of motivational interviewing for maintaining blood pressure improvements in a community-engaged lifestyle intervention conducted with African-Americans. Participants were tracked through a 12-month maintenance phase following a 6-month intervention targeting physical activity and diet. For the maintenance phase, participants were randomized to receive a low (4) or high (10) dose of motivational interviewing delivered via telephone by trained research staff. Generalized linear models were used to test for group differences in blood pressure. Blood pressure significantly increased during the maintenance phase. No differences were apparent between randomized groups. Results suggest that 10 or fewer motivational interviewing calls over a 12-month period may be insufficient to maintain post-intervention improvements in blood pressure. Further research is needed to determine optimal strategies for maintaining changes. PMID:26590242

  17. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  18. Human biomonitoring after chemical incidents and during short-term maintenance work as a tool for exposure analysis and assessment.

    Science.gov (United States)

    Bader, M; Van Weyenbergh, T; Verwerft, E; Van Pul, J; Lang, S; Oberlinner, C

    2014-12-15

    Human biomonitoring (HBM) is frequently used for the analysis and assessment of exposure to chemicals under routine working conditions. In recent years, HBM has also been applied to monitor the exposure of the general population, and of emergency responders in the aftermath of chemical incidents. Two examples of targeted HBM programs in the chemical industry are described and discussed in this paper: (1) analysis and assessment of the exposure of firefighters and chemical workers after the spill of p-chloroaniline from a burning chemical barrel, and (2) biomonitoring of maintenance workers potentially exposed to benzene during regular turnarounds. The results of these investigations underline that human biomonitoring contributes substantially to comprehensive exposure analyses, human health risk assessments and communication. In addition, regular HBM surveillance and feedback can assist in the continuous improvement of workplace safety measures and exposure control. In conclusion, data on accidental or short-term exposure to hazardous chemicals are an important source of information for the further development of limit and assessment values, the validation of biomarkers and of targeted HBM programs for both routine monitoring and disaster management. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  19. ATP economy of force maintenance in human tibialis anterior muscle

    DEFF Research Database (Denmark)

    Nakagawa, Yoshinao; Ratkevicius, Aivaras; Mizuno, Masao

    2005-01-01

    PURPOSE: The aim of this study was investigate ATP economy of force maintenance in the human tibialis anterior muscle during 60 s of anaerobic voluntary contraction at 50% of maximum voluntary contraction (MVC). METHODS: ATP turnover rate was evaluated using P magnetic resonance spectroscopy (P...... contraction. It averaged at 4.81 +/- 0.42 N.s.micromol-1, and correlated with the relative cross-sectional area of the muscle occupied by Type I fiber (r = 0.73, P contraction, subjects dropping in force showed lower ATP economy compared with those maintaining the force (3.......7 +/- 0.6 vs 5.3 +/- 0.6 N.s.micromol-1; P contraction could be due to an increase in the ATP economy of contracting muscle fibers offsetting the effects of increased temperature and low ATP economy...

  20. Applying Systems Engineering to Improve the Main Gas Turbine Exhaust System Maintenance Strategy for the CG-47 Ticonderoga Class Cruiser

    Science.gov (United States)

    2015-09-01

    national security and prosperity (U.S. Navy 2014). In perspective, oceans are the lifeblood of the planet and its entire population . The National...maintenance strategy, reliability-centered maintenance, cost, schedule, performance, growth -work, new-work, optimal fleet response plan, time-directed...76 5. Main Gas Turbine Exhaust System Growth -Work ..................77 E. RECOMMENDATIONS TO IMPROVE THE MAIN GAS TURBINE EXHAUST SYSTEM

  1. Opioid maintenance therapy in Switzerland: an overview of the Swiss IMPROVE study.

    Science.gov (United States)

    Besson, J; Beck, T; Wiesbeck, G; Hämmig, R; Kuntz, A; Abid, S; Stohler, R

    2014-01-01

    Switzerland's drug policy model has always been unique and progressive, but there is a need to reassess this system in a rapidly changing world. The IMPROVE study was conducted to gain understanding of the attitudes and beliefs towards opioid maintenance therapy (OMT) in Switzerland with regards to quality and access to treatment. To obtain a "real-world" view on OMT, the study approached its goals from two different angles: from the perspectives of the OMT patients and of the physicians who treat patients with maintenance therapy. The IMPROVE study collected a large body of data on OMT in Switzerland. This paper presents a small subset of the dataset, focusing on the research design and methodology, the profile of the participants and the responses to several key questions addressed by the questionnaires. IMPROVE was an observational, questionnaire-based cross-sectional study on OMT conducted in Switzerland. Respondents consisted of OMT patients and treating physicians from various regions of the country. Data were collected using questionnaires in German and French. Physicians were interviewed by phone with a computer-based questionnaire. Patients self-completed a paper-based questionnaire at the physicians' offices or OMT treatment centres. A total of 200 physicians and 207 patients participated in the study. Liquid methadone and methadone tablets or capsules were the medications most commonly prescribed by physicians (60% and 20% of patient load, respectively) whereas buprenorphine use was less frequent. Patients (88%) and physicians (83%) were generally satisfied with the OMT currently offered. The current political framework and lack of training or information were cited as determining factors that deter physicians from engaging in OMT. About 31% of OMT physicians interviewed were ≥60 years old, indicating an ageing population. Diversion and misuse were considered a significant problem in Switzerland by 45% of the physicians. The subset of IMPROVE data

  2. Flexible maintenance system (FMS). Background, concept, and results of technical development

    International Nuclear Information System (INIS)

    Yoshikawa, Hidekazu; Watanabe, Osami; Takizawa, Yoji; Ohga, Yukiharu; Ohi, Tadashi

    2006-01-01

    Maintenance works of nuclear power plants have been involved with various people and organizations. Thus human errors are apt to be made. Since 2000, the project on development of flexible maintenance system (FMS) has been conducted for five years in order to make maintenance works more rational and reduce human errors probability. Background, concept and results of technical development to upgrade maintenance works and training are reviewed. Advanced technology such as optical viewing equipments, laser holography inspection systems and neural networks shall be applied to maintenance works. (T. Tanaka)

  3. Reliability centered maintenance streamlining through lessons learned

    International Nuclear Information System (INIS)

    Strong, D.K.

    1991-01-01

    In late 1986, PSE and G concluded that the Nuclear Department would develop a consistent approach to maintenance at Artificial Island (Salem and Hope Creak nuclear units). Preventive maintenance (PM) would be the heart of this approach. In the last six months of 1987 departments affected by the maintenance program participated on working groups that developed the Artificial Island maintenance philosophy. The central theme of the maintenance philosophy is the RCM (reliability centered maintenance) process. A pilot project tested the process in 1988. In 1989 the Central PM Group formed and in 1990 was given responsibility and authority to analyze, approve, implement, and control PM program changes. RCM is the central theme of the PM improvement effort but not the whole effort. Other important pieces included in this paper are: development of a common PM program, improvement of work instructions, development of predictive maintenance techniques into programs, development of a PM basis database, development of PM feedback from failure trends, root cause analysis, maintenance performance indicators, technicians, and engineers

  4. Comparative analysis of genome maintenance genes in naked mole rat, mouse, and human.

    Science.gov (United States)

    MacRae, Sheila L; Zhang, Quanwei; Lemetre, Christophe; Seim, Inge; Calder, Robert B; Hoeijmakers, Jan; Suh, Yousin; Gladyshev, Vadim N; Seluanov, Andrei; Gorbunova, Vera; Vijg, Jan; Zhang, Zhengdong D

    2015-04-01

    Genome maintenance (GM) is an essential defense system against aging and cancer, as both are characterized by increased genome instability. Here, we compared the copy number variation and mutation rate of 518 GM-associated genes in the naked mole rat (NMR), mouse, and human genomes. GM genes appeared to be strongly conserved, with copy number variation in only four genes. Interestingly, we found NMR to have a higher copy number of CEBPG, a regulator of DNA repair, and TINF2, a protector of telomere integrity. NMR, as well as human, was also found to have a lower rate of germline nucleotide substitution than the mouse. Together, the data suggest that the long-lived NMR, as well as human, has more robust GM than mouse and identifies new targets for the analysis of the exceptional longevity of the NMR. © 2015 The Authors. Aging Cell published by the Anatomical Society and John Wiley & Sons Ltd.

  5. Improved Navy Maintenance Through Corrosion-Fatigue Assessment Program

    National Research Council Canada - National Science Library

    Hoppe, Wally

    2008-01-01

    ... to evaluate issues relevant to corrosion-fatigue of aircraft components. In this multi-year, multi-contract program, tools have been developed to assist in the establishment of maintenance options for corroded components...

  6. Good practices for cost effective maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1997-02-01

    This publication is organized around five areas that were identified by the utilities and government organizations who contributed to this report as most important to them. They are: Increasing production through maintenance activities related to improved plant material condition, reduced duration of planned outages, use of on-line maintenance and reduced frequency of forced outages; reducing workload through avoiding unnecessary regulatory burden and using reliability centered maintenance and condition monitoring; improving maintenance processes through better planning and scheduling, use of information management systems, graduated work controls, and appropriate post-maintenance testing; improving productivity through better teamwork, greater sharing of resources, and better radiation management associated with maintenance; measuring performance of maintenance activities through such tools as performance measures and benchmarking. Figs, tabs

  7. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  8. Improvement in renal function after everolimus introduction and calcineurin inhibitor reduction in maintenance thoracic transplant recipients

    DEFF Research Database (Denmark)

    Arora, Satish; Gude, Einar; Sigurdardottir, Vilborg

    2012-01-01

    The NOCTET (NOrdic Certican Trial in HEart and lung Transplantation) trial demonstrated that everolimus improves renal function in maintenance thoracic transplant (TTx) recipients. Nevertheless, introduction of everolimus is not recommended for patients with advanced renal failure. We evaluated...... NOCTET data to assess everolimus introduction amongst TTx recipients with advanced renal failure....

  9. Development of plant maintenance systems

    International Nuclear Information System (INIS)

    Tomita, Jinji; Ike, Masae; Nakayama, Kenji; Kato, Hisatomo

    1989-01-01

    Toshiba is making active efforts for the continuing improvement of reliability and maintainability of operating nuclear power plants. As a part of these efforts, the company has developed new maintenance administration systems, diagnostic monitoring facilities for plant equipments, computer-aided expert systems, and remote-controlled machines for maintenance work. The maintenance administration systems provide efficient work plans and data acquisition capabilities for the management of personnel and equipments involved in nuclear power plant maintenance. The plant diagnostic facilities monitor and diagnose plant conditions for preventive maintenance, as well as enabling rapid countermeasures to be carried out should they be required. Expert systems utilizing artificial intelligence (AI) technology are also employed. The newly developed remote-controlled machines are useful tools for the maintenance inspection of equipment which can not be easily accessed. (author)

  10. Improved quality of input data for maintenance optimization using expert judgment

    International Nuclear Information System (INIS)

    Oien, Knut

    1998-01-01

    Most maintenance optimization models need an estimate of the so-called 'naked' failure rate function as input. In practice it is very difficult to estimate the 'naked' failure rate, because overhauls and other preventive maintenance actions tend to 'corrupt' the recorded lifelengths. The purpose of this paper is to stress the importance of utilizing the knowledge of maintenance engineers, i.e., expert judgment, in addition to recorded equipment lifelengths, in order to get credible input data. We have shown that without utilizing expert judgment, the estimated mean time to failure may be strongly biased, often by a factor of 2-3, depending on the life distribution that is assumed. We recommend including a simple question about the mean remaining lifelength on the work-order forms. By this approach the knowledge of maintenance engineers may be incorporated in a simple and cost-effective way

  11. Can training improve human performance

    International Nuclear Information System (INIS)

    Waylett, W.J. Jr.

    1986-01-01

    The nuclear industry has made a significant commitment to improve training through the implementation of performance-based training programs. Senior management expects that human performance improvement will result from this significant resource allocation. The author examines this hypothesis and discusses other issues that may interfere with enhancing human performance through training. The integration of quality improvement concepts to support training is also discussed by the author, who was a pioneer facilitator during the development of Florida Power and Light Company's Quality Improvement Program. Critical success factors are proposed based on the author's experience as a plant manager, training manager and quality facilitator

  12. Integration of infrared thermography into various maintenance methodologies

    Science.gov (United States)

    Morgan, William T.

    1993-04-01

    Maintenance methodologies are in developmental stages throughout the world as global competitiveness drives all industries to improve operational efficiencies. Rapid progress in technical advancements has added an additional strain on maintenance organizations to progressively change. Accompanying needs for advanced training and documentation is the demand for utilization of various analytical instruments and quantitative methods. Infrared thermography is one of the primary elements of engineered approaches to maintenance. Current maintenance methodologies can be divided into six categories; Routine ('Breakdown'), Preventive, Predictive, Proactive, Reliability-Based, and Total Productive (TPM) maintenance. Each of these methodologies have distinctive approaches to achieving improved operational efficiencies. Popular though is that infrared thermography is a Predictive maintenance tool. While this is true, it is also true that it can be effectively integrated into each of the maintenance methodologies for achieving desired results. The six maintenance strategies will be defined. Infrared applications integrated into each will be composed in tabular form.

  13. Simulated maintenance a virtual reality

    International Nuclear Information System (INIS)

    Lirvall, P.

    1995-01-01

    The article describes potential applications of personal computer-based virtual reality software. The applications are being investigated by Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories for the Canadian deuterium-uranium (Candu) reactor. Objectives include: (1) reduction of outage duration and improved safety, (2) cost-effective and safe maintenance of equipment, (3) reduction of exposure times and identification of overexposure situations, (4) cost-effective training in a virtual control room simulator, (5) human factors evaluation of design interface, and (6) visualization of conceptual and detailed designs of critical nuclear field environments. A demonstration model of a typical reactor control room, the use of virtual reality in outage planning, and safety issues are outlined

  14. Maintenance: Two Views.

    Science.gov (United States)

    Ballard, J. Barry; Burdette, Clarence E.

    1987-01-01

    Presents two viewpoints on the question of using funding from the Vocational Education Act to maintain ongoing vocational programs. Ballard argues that programs have improved qualitatively because of additional program improvement monies, whereas Burdette argues that the ban on using funds for maintenance treats some states unfairly. (CH)

  15. OPTIMALISASI KINERJA PERSEDIAAN SUKU CADANG UNTUK PELAKSANAAN MAINTENANCE REPAIR OVERHAUL (MRO DENGAN PENERAPAN COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEMS (CMMS (Studi Kasus di PT. Indonesia Asahan Aluminium

    Directory of Open Access Journals (Sweden)

    Sutrisno Sutrisno

    2015-04-01

    Full Text Available PT.Inalum is a manufacturing company engaged in the aluminum smelting industry. PT.Inalum pengendaliaan system requires an inventory of spare parts to conduct maintenance, repair and overhaul (MRO. CMMS (Computerized Maintenance Management System is a computerized maintenance system running on a LAN (Local Area Network. CMMS is influenced by three variables, namely an integrated maintenance, inventory and procurement so as to create a good maintenance should be supported by the inventory control of spare parts used in maintenance. CMMS aims to make the work more efficient and effective, especially in matters relating to maintenance. That as a benchmark to measure the performance of CMMs for spare parts inventory control is a key performance indicator (KPI. This study aims to evaluate and compare key performance indicators before and after implementation of CMMS for the implementation of MRO activities. Another goal to be achieved is to determine the factors that affect the value of the inventory of spare parts. Based on the results of data processing and analysis can be seen that by looking at a comparison of before and after implementation of CMMS on key performance indicators, it appears that there is an improvement in every parameter, one of which is the value of the inventory prior to the implementation of CMMS for $ 34,790,000.00 compared to after the application of the inventory value fell to $ 19,632,000.00. Factors that affect the value of the inventory is the inventory of spare parts, maintenance, procurement, and human resources.

  16. Maintenance Therapy in Ovarian Cancer with Targeted Agents Improves PFS and OS: A Systematic Review and Meta-Analysis.

    Directory of Open Access Journals (Sweden)

    Xinyu Qian

    Full Text Available Maintenance therapy with targeted agents for prolonging remission for ovarian cancer patients remains controversial. As a result, a meta-analysis was conducted to assess the effectiveness and safety of using maintenance therapy with targeted agents for the treatment of ovarian cancer.From inception to January 2015, we searched for randomized, controlled trials (RCTs using the following databases: PubMed, ScienceDirect, the Cochrane Library, Clinicaltrials.gov and EBSCO. Eligible trials included RCTs that evaluated standard chemotherapy which was either followed or not followed by targeted maintenance in patients with ovarian cancer who had been previously receiving adjunctive treatments, such as cytoreductive surgery and standard chemotherapy. The outcome measures included progression-free survival (PFS, overall survival (OS and incidence of adverse events.A total of 13 RCTs, which were published between 2006 and 2014, were found to be in accordance with our inclusion criteria. The primary meta-analysis indicated that both PFS and OS were statistically and significantly improved in the targeted maintenance therapy group as compared to the control group (PFS: HR = 0.84, 95%CI: 0.75 to 0.95, p = 0.001; OS: HR = 0.91, 95%CI: 0.84 to 0.98, p = 0.02. When taking safety into consideration, the use of targeted agents was significantly correlated with increased risks of fatigue, diarrhea, nausea, vomiting, and hypertension. However, no significant differences were found in incidence rates of abdominal pain, constipation or joint pain.Our results indicate that targeted maintenance therapy clearly improves the survival of ovarian cancer patients but may also increase the incidence of adverse events. Additional randomized, double-blind, placebo-controlled, multicenter investigations will be required on a larger cohort of patients to verify our findings.

  17. Extending Virtual Reality simulation of ITER maintenance operations with dynamic effects

    International Nuclear Information System (INIS)

    Heemskerk, C.J.M.; Baar, M.R. de; Boessenkool, H.; Graafland, B.; Haye, M.J.; Koning, J.F.; Vahedi, M.; Visser, M.

    2011-01-01

    Virtual Reality (VR) simulation can be used to study, improve and verify ITER maintenance operations during preparation. VR can also improve the situational awareness of human operators during actual Remote Handling (RH) operations. Until now, VR systems use geometric models of the environment and the objects being handled and kinematic models of the manipulation systems. The addition of dynamic effects into the VR simulation was investigated. Important dynamic effects are forces due to contact transitions and the bending of beams under heavy loads. A novel dynamics simulation module was developed and introduced as an add-on to the VR4Robots VR software. Tests were performed under simplified test conditions and in the context of realistic ITER maintenance tasks on a benchmark product and on the ECRH Upper Port Launcher Plug (UPL). The introduction of dynamic effects into VR simulations was found to add realism and provide new insights in procedure development. The quality of the haptic feedback depends strongly on the haptic device used to 'display' haptic feedback to the operator. Dynamic effect simulation can also form the basis for real-time guidance support to operators during the execution of maintenance tasks (augmented reality).

  18. Non destructive examinations and degradations: the use of feedback experience to improve maintenance policy

    International Nuclear Information System (INIS)

    Champigny, F.

    2007-01-01

    In France, since 1995, 58 pressurized water reactors have been operating to produce electricity. These reactors were built from 1975 to the beginning of nineties and are ranked in 4 standardized series, 900 MWe CP0 types, 900 MWe CPY types, 1300 MWe types and 1400 MWe types. The plants have undergone evolutions taking into account the feedback experience for manufacturing and construction, net power growth but also maintenance operations. In 1977 the first maintenance programs were based upon the American experience using ASME section XI code. As and when required, they have been modified with the events appeared during the operation. First of them concerned the steam generator tubes with the discover of the first primary water stress corrosion cracking at the end of the seventies then the under-clad cracking phenomenon in the 900 MWe pressure vessel nozzles. At the beginning of years 2000, the new departmental order dedicated to operation required to check and modify, if necessary, the maintenance policy to better take into account the possible damages, fast fracture studies for primary and secondary systems and, last but not least, qualification processes for non destructive examinations. These new requirements have induced a rewriting of the maintenance policies and inspection programs in the way to be more consistent with the need of an improved availability of the plants while keeping a high safety level. Through few examples, we show how the approaches and the practices have been modified in terms of non-destructive examination (NDE) and particularly the impact of the NDE qualification results. In addition, examples of the important choices between in-service inspection and repair policy are also described. (author)

  19. Improving motor reliability in nuclear power plants: Volume 1, Performance evaluation and maintenance practices

    International Nuclear Information System (INIS)

    Subudhi, M.; Gunther, W.E.; Taylor, J.H.; Sugarman, A.C.; Sheets, M.W.

    1987-11-01

    This report constitutes the first of the three volumes under this NUREG. The report presents recommendations for developing a cost-effective program for performance evaluation and maintenance of electric motors in nuclear power plants. These recommendations are based on current industry practices, available techniques for monitoring degradation in motor components, manufacturer's recommendations, operating experience, and results from two laboratory tests on aged motors. Two laboratory test reports on a small and a large motor are presented in separate volumes of this NUREG. These provide the basis for the various functional indicators recommended for maintenance programs in this report. The overall preventive maintenance program is separated into two broad areas of activity aimed at mitigating the potential effects of equipment aging: Performance Evaluation and Equipment Maintenance. The latter involves actually maintaining the condition of the equipment while the former involves those activities undertaken to monitor degradation due to aging. These monitoring methods are further categorized into periodic testing, surveillance testing, continuous monitoring and inspections. This study focuses on the methods and procedures for performing the above activities to maintain the motors operationally ready in a nuclear facility. This includes an assessment of various functional indicators to determine their suitability for trending to monitor motor component condition. The intrusiveness of test methods and the present state-of-the-art for using the test equipment in a plant environment are discussed. In conclusion, implementation of the information provided in this report, will improve motor reliability in nuclear power plants. The study indicates the kinds of tests to conduct, how and when to conduct them, and to which motors the tests should be applied. 44 refs., 12 figs., 13 tabs

  20. Business process modeling of industrial maintenance at TRANSPETRO: integrating oil pipeline and marine terminals activities

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio), Rio de Janeiro, RJ (Brazil). Programa de Pos-Graduacao em Metrologia para Qualidade e Inovacao

    2009-07-01

    This paper describes the experience of TRANSPETRO in remodeling industrial maintenance activities focusing on: preparing for business process modeling (BPM); mapping and analyzing 'As-Is' process; designing 'To-Be' process; implementing remodeled process; improving process continuously. The conceptual model and results achieved will contribute to several areas within the company as: reliability engineering; human resources, including employees' selective processes, training and development, and certifications; standardization process encompassing standard and operational procedures adoption according to up-dating external normative references and legal requirements; health, safety and environment (HSE) performance improvement. These are some of potential benefits from BPM focusing on TRANSPETRO's industrial maintenance area in the search of operational excellence. (author)

  1. Improved inflammatory activity with peginterferon alfa-2b maintenance therapy in non-cirrhotic prior non-responders: a randomized study.

    Science.gov (United States)

    Poynard, Thierry; Bruix, Jordi; Schiff, Eugene R; Diago, Moises; Berg, Thomas; Moreno-Otero, Ricardo; Lyra, Andre C; Carrilho, Flair; Griffel, Louis H; Boparai, Navdeep; Jiang, Ruiyun; Burroughs, Margaret; Brass, Clifford A; Albrecht, Janice K

    2013-03-01

    Therapeutic options for patients failing hepatitis C retreatment are limited. EPIC(3) included a prospective trial assessing long-term peginterferon alfa-2b (PegIFNα-2b) maintenance therapy in patients with METAVIR fibrosis scores (MFS) of F2 or F3 who previously failed hepatitis C retreatment. Patients with F2/F3 MFS who failed retreatment were randomized to PegIFNα-2b (0.5 μg/kg/week, n=270) or observation (n=270) for 36 months. Blinded liver biopsies obtained before retreatment and after maintenance therapy were evaluated using MFS and activity scores, and confirmatory testing was performed using FibroTest and ActiTest. In total, 348 patients had paired biopsies: 192 patients had missing post-treatment biopsies and were considered as having no change in fibrosis/activity scores. In total, 16% of patients receiving PegIFNα-2b and 11% of observation patients had improvement in MFS (p=0.32). More PegIFNα-2b than observation patients had improvement in activity score (20% vs. 9%; p 2.5 years, improvement in MFS or activity score was more common with PegIFNα-2b than observation (21% vs. 14%, p=0.08 and 26% vs. 10%, p 2.5 years. Both FibroTest and ActiTest were significantly improved during maintenance therapy. Copyright © 2012 European Association for the Study of the Liver. Published by Elsevier B.V. All rights reserved.

  2. Comparative Proteomic Analysis of Supportive and Unsupportive Extracellular Matrix Substrates for Human Embryonic Stem Cell Maintenance*

    Science.gov (United States)

    Soteriou, Despina; Iskender, Banu; Byron, Adam; Humphries, Jonathan D.; Borg-Bartolo, Simon; Haddock, Marie-Claire; Baxter, Melissa A.; Knight, David; Humphries, Martin J.; Kimber, Susan J.

    2013-01-01

    Human embryonic stem cells (hESCs) are pluripotent cells that have indefinite replicative potential and the ability to differentiate into derivatives of all three germ layers. hESCs are conventionally grown on mitotically inactivated mouse embryonic fibroblasts (MEFs) or feeder cells of human origin. In addition, feeder-free culture systems can be used to support hESCs, in which the adhesive substrate plays a key role in the regulation of stem cell self-renewal or differentiation. Extracellular matrix (ECM) components define the microenvironment of the niche for many types of stem cells, but their role in the maintenance of hESCs remains poorly understood. We used a proteomic approach to characterize in detail the composition and interaction networks of ECMs that support the growth of self-renewing hESCs. Whereas many ECM components were produced by supportive and unsupportive MEF and human placental stromal fibroblast feeder cells, some proteins were only expressed in supportive ECM, suggestive of a role in the maintenance of pluripotency. We show that identified candidate molecules can support attachment and self-renewal of hESCs alone (fibrillin-1) or in combination with fibronectin (perlecan, fibulin-2), in the absence of feeder cells. Together, these data highlight the importance of specific ECM interactions in the regulation of hESC phenotype and provide a resource for future studies of hESC self-renewal. PMID:23658023

  3. Maintenance Tools applied to Electric Generators to Improve Energy Efficiency and Power Quality of Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Milton Fonseca Junior

    2017-07-01

    Full Text Available This paper presents a specific method to improve the reliability of the equipment and the quality of power supplied to the electrical systems with the frequency and voltage control of a thermoelectric plant, to guarantee a more stable system. The method has the novelty of combining Total Productive Maintenance (TPM using only four pillars, with Electrical Predictive Maintenance based in failure analysis and diagnostic. It prevents voltage drops caused by excessive reactive consumption, thus guaranteeing the company a perfect functioning of its equipment and providing a longer life of them. The Maintenance Management Program (MMP seeks to prevent failures from causing the equipment to be shut down from the electrical system, which means large financial losses, either by reducing billing or by paying fines to the regulatory agency, in addition to prejudice the reliability of the system. Using management tools, but applying only four TPM pillars, it was possible to achieve innovation in power plants with internal combustion engines. This study aims to provide maintenance with a more reliable process, through the implantation of measurement, control and diagnostic devices, thus allowing the management to reduce breakdown of plant equipment. Some results have been achieved after the implementation, such as reduction of annual maintenance cost, reduction of corrective maintenance, increase of MTBF (Mean Time between Failures and reduction of MTTR (Mean Time to Repair in all areas. Probabilistic models able to describe real processes in a more realistic way, and facilitate the optimization at maximum reliability or minimum costs are presented. Such results are reflected in more reliable and continual power generation.

  4. Enhanced human performance of utility maintenance programs

    International Nuclear Information System (INIS)

    Fresco, A.; Haber, S.; O'Brien, J.

    1993-01-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant's maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program

  5. Safety related maintenance in the framework of the reliability centered maintenance concept

    International Nuclear Information System (INIS)

    1992-07-01

    Elevated safety requirements and ever increasing costs of maintenance of nuclear power plants stimulate the interest in different methods and approaches to optimize maintenance activities. Among different concepts, the Reliability Centered Maintenance (RCM) as an approach to improve Preventive Maintenance (PM) programmes is being widely discussed an applied in several IAEA Member States. In order to summarize basic principles and current implementation of the RCM, the IAEA organized a Consultants Meeting in November 1990. The report prepared during that meeting was discussed during the Technical Committee Meeting (TCM) held in May 1991. Numerous technical presentations as well as panel and plenary discussions took place at the TCM. This document contains the report of the Consultants Meeting (modified to include comments of the TCM), a summary of the most important discussions as well as all 14 papers presented at the TCM

  6. Technology Trend in the Maintenance of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yoon, Kyungsup; Lee, Unjang

    2014-01-01

    In this paper, overall technology evolution is reviewed and the improvements in the plant safety, reliability and productivity are described. And the issue and some recommendation for better maintenance of Korean nuclear power plants are presented as the interim study results on the 'Management and Regulatory Policy for the Nuclear Power Plant Maintenance and Equipment Reliability' under the agreement with the Nuclear Safety and Security Commission. The future trend in the maintenance technologies is also covered. Maintenance is the essential element for the enhancement of plant safety, reliability and economics and also for public safety. Therefore the regulator's involvements and the utility's active participation is inevitable for the better maintenance. For the better sustainability of our nuclear power plants the followings are recommended. ·Establishment of the good maintenance program and continuous improvement. ·Application of OLM on the safety related and non-safety related components by step-by-step approach. ·Improvement PRA technology for the accurate and reliable risk analysis. ·Continuous training and cultivation for the qualified maintenance personnel

  7. Technology Trend in the Maintenance of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Kyungsup; Lee, Unjang [CTO and CEO, Seoul (Korea, Republic of)

    2014-05-15

    In this paper, overall technology evolution is reviewed and the improvements in the plant safety, reliability and productivity are described. And the issue and some recommendation for better maintenance of Korean nuclear power plants are presented as the interim study results on the 'Management and Regulatory Policy for the Nuclear Power Plant Maintenance and Equipment Reliability' under the agreement with the Nuclear Safety and Security Commission. The future trend in the maintenance technologies is also covered. Maintenance is the essential element for the enhancement of plant safety, reliability and economics and also for public safety. Therefore the regulator's involvements and the utility's active participation is inevitable for the better maintenance. For the better sustainability of our nuclear power plants the followings are recommended. ·Establishment of the good maintenance program and continuous improvement. ·Application of OLM on the safety related and non-safety related components by step-by-step approach. ·Improvement PRA technology for the accurate and reliable risk analysis. ·Continuous training and cultivation for the qualified maintenance personnel.

  8. State-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-04-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system. 5 references, 8 figures

  9. A development of maintenance educational support method by using navigation method. Pt. 3. A detal design of RHR pump maintenance educational support prototype system

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo; Tsumura, Joji

    2003-01-01

    This research establishes the new maintenance educational support prototype system for aiming at organization as Trinity (a supervision person, a construction person in charge, a work person in charge, and group length), and improvement in human reliability for the purpose of aiming at before hand prevention of a systematic error, human error, and the accident and a trouble. Main results: (1) This paper prototype system acquired a participant data by the input of 'position and rank' etc. of a participant, and was taken as the structure which navigates the participant exactly from the start of RHR pump maintenance work to the end on the basis of the data (question etc.) while performing reeducation based on the reply of an organization, organization, and the participant to the structure-ized question in connection with on-site work, judging, and the judgment result etc. by the system. (2) RHR pump maintenance work has the complicated hierarchy. Then, in order to raise the study effect of the participant about maintenance education, it considered as the structure as which that a participant does what study, further to which process a participant next progresses in which protion of the whole maintenance process a participant is and etc. A participant can always keep regarding the whole study in connection with maintenance education (Fig. 2). (3) This paper prototype system was taken as the structure which shows clearly a participant special feature, weak point, etc., by plotting an organization, organization, and the reply result of the subject of the question completion before in connection with on-site work, and after completion on the same screen. (4) This paper prototype system Judge how changed a participant action pattern's completion front, and after completion. For example, from the organization neglect/duty neglect type before completion, after completion specifies having changed to the organization/duty serious-consideration type, further, is adding the

  10. Towards Improved Human Resource Development In Nigeria ...

    African Journals Online (AJOL)

    Towards Improved Human Resource Development In Nigeria: Challenges And Prospects. ... Journal of Research in National Development ... Consequently, the paper recommended; improved investment in education, implementable policies on human resource development, involvement of private organization in human ...

  11. Guidance for the design and management of a maintenance plan to assure safety and improve the predictability of a DOE nuclear irradiation facility. Final report

    International Nuclear Information System (INIS)

    Booth, R.S.; Kryter, R.C.; Shepard, R.L.; Smith, O.L.; Upadhyaya, B.R.; Rowan, W.J.

    1994-10-01

    A program is recommended for planning the maintenance of DOE nuclear facilities that will help safety and enhance availability throughout a facility's life cycle. While investigating the requirements for maintenance activities, a major difference was identified between the strategy suitable for a conventional power reactor and one for a research reactor facility: the latter should provide a high degree of predicted availability (referred to hereafter as ''predictability'') to its users, whereas the former should maximize total energy production. These differing operating goals necessitate different maintenance strategies. A strategy for scheduling research reactor facility operation and shutdown for maintenance must balance safety, reliability,and predicted availability. The approach developed here is based on three major elements: (1) a probabilistic risk analysis of the balance between assured reliability and predictability (presented in Appendix C), (2) an assessment of the safety and operational impact of maintenance activities applied to various components of the facility, and (3) a data base of historical and operational information on the performance and requirements for maintenance of various components. These factors are integrated into a set of guidelines for designing a new highly maintainable facility, for preparing flexible schedules for improved maintenance of existing facilities, and for anticipating the maintenance required to extend the life of an aging facility. Although tailored to research reactor facilities, the methodology has broader applicability and may therefore be used to improved the maintenance of power reactors, particularly in anticipation of peak load demands

  12. An improved segmentation-based HMM learning method for Condition-based Maintenance

    International Nuclear Information System (INIS)

    Liu, T; Lemeire, J; Cartella, F; Meganck, S

    2012-01-01

    In the domain of condition-based maintenance (CBM), persistence of machine states is a valid assumption. Based on this assumption, we present an improved Hidden Markov Model (HMM) learning algorithm for the assessment of equipment states. By a good estimation of initial parameters, more accurate learning can be achieved than by regular HMM learning methods which start with randomly chosen initial parameters. It is also better in avoiding getting trapped in local maxima. The data is segmented with a change-point analysis method which uses a combination of cumulative sum charts (CUSUM) and bootstrapping techniques. The method determines a confidence level that a state change happens. After the data is segmented, in order to label and combine the segments corresponding to the same states, a clustering technique is used based on a low-pass filter or root mean square (RMS) values of the features. The segments with their labelled hidden state are taken as 'evidence' to estimate the parameters of an HMM. Then, the estimated parameters are served as initial parameters for the traditional Baum-Welch (BW) learning algorithms, which are used to improve the parameters and train the model. Experiments on simulated and real data demonstrate that both performance and convergence speed is improved.

  13. Gentilly 2 maintenance in a total quality environment

    Energy Technology Data Exchange (ETDEWEB)

    Ross, M H; Marois, H [Hydro-Quebec, Gentilly (Canada). Gentilly Generating Station

    1993-12-31

    Comprehensive preventive maintenance programs at Gentilly-2 Nuclear Generating Station are based on a policy that seeks to balance requirements against resources. A commitment to total quality aims at performance improvement and total customer satisfaction. To improve overall performance to an annual availability factor of 90%, planned outages must be limited to 21 days per year, and the preventive maintenance program must be upgraded. A quality improvement team is involved in supporting this initiative. This team will seek to bring a new balance to the program, and eventually optimize it, using reliability-centred maintenance techniques. 24 figs.

  14. Development and evaluation of a movie-centric multimedia system for supporting operation and maintenance 'K-SHOW'

    International Nuclear Information System (INIS)

    Kage, Yoshiko; Kubono, Norimitsu

    2006-01-01

    The fact that operators in the power plants and the power networks needed On the Job Training (OJT) opportunities and adequate materials was one of the most important factors that improved human performance. In this research, we have developed, 'Movie-centric Multimedia System', or 'K-SHOW', for supporting operation and maintenance in order to improve their skills and knowledge. Operators could author the movies with texts, symbols, and so forth interactively and flexibly and could view it on the CRT screen. Operators could learn expert' know-how and check the operations before working actual operation. Operators rated this system as a highly useful tool of transfer for supporting operation and maintenance in their workplaces. (author)

  15. Improvement of the M/S manipulator maintenance at OSL

    International Nuclear Information System (INIS)

    Kuwana, Koichi; Ouchi, Hiroshi; Ito, Yutaka; Sato, Yoshihiro; Midorikawa, Mituhiro; Hayakawa, Tuyoshi

    2010-01-01

    The safeguards inspection samples from the JNFL Rokkasho Reprocessing Plant (RRP) are received and analyzed at the On Site Laboratory (OSL). Since the samples from the input accountancy tank of the RRP contain a lot of fission products, they are treated in a hot-cell line with a M/S (Master /Slave) manipulator. Special equipment and tools were used for the maintenance of the M/S manipulator, especially for the exchange of the M/S manipulator. However, the manipulator exchange work was not easy due to the limitation of the space in the OSL. For solution to this problem, a monorail and monorail hoist equipment was installed onto wall surface of analytical room close to each M/S manipulator, and then it made the exchange of M/S manipulator easy without special equipment and tools. Additionally, operator was freed from the burden of working space arranging for the exchange of M/S manipulator such as removing of analytical equipments. This report represents the improvement of operation for the exchange of M/S manipulator with installation of monorail and hoist equipment. (author)

  16. Leisure-time activity is an important determinant of long-term weight maintenance after weight loss in the Sibutramine Trial on Obesity Reduction and Maintenance (STORM trial)

    DEFF Research Database (Denmark)

    van Baak, M. A.; van Mil, E.; Astrup, A.

    2003-01-01

    The success rate of long-term maintenance of weight loss in obese patients is usually low. To improve the success rate, determinants of long-term weight maintenance must be identified.......The success rate of long-term maintenance of weight loss in obese patients is usually low. To improve the success rate, determinants of long-term weight maintenance must be identified....

  17. Reliability centred maintenance of nuclear power plant facilities

    International Nuclear Information System (INIS)

    Kovacs, Zoltan; Novakova, Helena; Hlavac, Pavol; Janicek, Frantisek

    2011-01-01

    A method for the optimization of preventive maintenance nuclear power plant equipment, i.e. reliability centred maintenance, is described. The method enables procedures and procedure schedules to be defined such as allow the maintenance cost to be minimized without compromising operational safety or reliability. Also, combinations of facilities which remain available and ensure reliable operation of the reactor unit during the maintenance of other pieces of equipment are identified. The condition-based maintenance concept is used in this process, thereby preventing unnecessary operator interventions into the equipment, which are often associated with human errors. Where probabilistic safety assessment is available, the most important structures, systems and components with the highest maintenance priority can be identified. (orig.)

  18. Human Reliability and the Current Dilemma in Human-Machine Interface Design Strategies

    International Nuclear Information System (INIS)

    Passalacqua, Roberto; Yamada, Fumiaki

    2002-01-01

    Since human error dominates the probability of failures of still-existing human-requiring systems (as the Monju reactor), the human-machine interface needs to be improved. Several rationales may lead to the conclusion that 'humans' should limit themselves to monitor the 'machine'. For example, this is the trend in the aviation industry: newest aircrafts are designed to be able to return to a safe state by the use of control systems, which do not need human intervention. Thus, the dilemma whether we really need operators (for example in the nuclear industry) might arise. However, social-technical approaches in recent human error analyses are pointing out the so-called 'organizational errors' and the importance of a human-machine interface harmonization. Typically plant's operators are a 'redundant' safety system with a much lower reliability (than the machine): organizational factors and harmonization requirements suggest designing the human-machine interface in a way that allows improvement of operator's reliability. In addition, taxonomy studies of accident databases have also proved that operators' training should promote processes of decision-making. This is accomplished in the latest trends of PSA technology by introducing the concept of a 'Safety Monitor' that is a computer-based tool that uses a level 1 PSA model of the plant. Operators and maintenance schedulers of the Monju FBR will be able to perform real-time estimations of the plant risk level. The main benefits are risk awareness and improvements in decision-making by operators. Also scheduled maintenance can be approached in a more rational (safe and economic) way. (authors)

  19. Predictive maintenance primer

    International Nuclear Information System (INIS)

    Flude, J.W.; Nicholas, J.R.

    1991-04-01

    This Predictive Maintenance Primer provides utility plant personnel with a single-source reference to predictive maintenance analysis methods and technologies used successfully by utilities and other industries. It is intended to be a ready reference to personnel considering starting, expanding or improving a predictive maintenance program. This Primer includes a discussion of various analysis methods and how they overlap and interrelate. Additionally, eighteen predictive maintenance technologies are discussed in sufficient detail for the user to evaluate the potential of each technology for specific applications. This document is designed to allow inclusion of additional technologies in the future. To gather the information necessary to create this initial Primer the Nuclear Maintenance Applications Center (NMAC) collected experience data from eighteen utilities plus other industry and government sources. NMAC also contacted equipment manufacturers for information pertaining to equipment utilization, maintenance, and technical specifications. The Primer includes a discussion of six methods used by analysts to study predictive maintenance data. These are: trend analysis; pattern recognition; correlation; test against limits or ranges; relative comparison data; and statistical process analysis. Following the analysis methods discussions are detailed descriptions for eighteen technologies analysts have found useful for predictive maintenance programs at power plants and other industrial facilities. Each technology subchapter has a description of the operating principles involved in the technology, a listing of plant equipment where the technology can be applied, and a general description of the monitoring equipment. Additionally, these descriptions include a discussion of results obtained from actual equipment users and preferred analysis techniques to be used on data obtained from the technology. 5 refs., 30 figs

  20. The state-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-01-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system

  1. CANDU 9 Design improvements based on experience feedback

    International Nuclear Information System (INIS)

    Yu, S. K. W.; Bonechi, M.; Snell, V. G.

    2000-01-01

    An evolutionary approach utilizing advance technologies has been implenented for the enhancement introduced in the CANDU 9 Nuclear Power Plant (NPP) design. The design of these systems and associated equipment has also benfited from experience feedback from operating CANDU stations and from including advanced products from CANDU engineering and research programs. This paper highlights the design features that contribute to the safety improvements of the CANDU 9 design, summarizes the analysis results which demonstrate the improved performance and also emphasizes design features which reduce operation and maintenance (Q and M) costs. The safety design features highlighted include the increased use of passive devices and heat sinks to achieve extensive system simplification; this also improves reliability and reduces maintenance workloads. System features that contribute to improved operability are also described. The CANDU 9 Control Center provides plant staff with enhanced operating, maintenance and diagnostics features which significantly improve operability, testing and maintainability due to the integration of human factors engineering with a systematic design process. (author)

  2. Operations and maintenance - Safety challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Liv [Oljedirektoratet, Stavanger (Norway)

    1999-07-01

    With the unsteady oil prices and the possible consequences of the deregulation of the European energy markets one may expect further optimization of operating and maintenance costs. One may also expect extended use of various risk-based optimization techniques such as RCM (Reliability Centered Maintenance) and RBI (Risk Based Inspection). This presentation addresses the need for further research and development in this area. Maintenance work is necessary, but it can also create risk. The accident statistics show many examples of this. The Norwegian petroleum industry's ability to learn from previous incidents is questioned. Maintenance staff must be well trained and possess the necessary routines. Technical documentation must be updated. Uncertainties with respect to future oil and gas prices combined with the effect of the deregulation of the European energy markets will lead to even more focus on cost-effective operations and maintenance. The need for long-term research and development is stressed. Risk based techniques such as RCM and RBI are extensively used in the defence industry and the nuclear industry, but applying them to the petroleum industry requires improved risk models. Ageing effects such as corrosion, erosion, fatigue etc. can be expected, but the capability to predict, monitor and control them should be improved. At present, not even the most sophisticated risk analysis can model ageing effects. The importance of efficient use of information technology (IT) is stressed. Improving the product quality and safety often requires new technology and so research and development is important. Close cooperation with the industry is required.

  3. Understanding and Predicting the Process of Software Maintenance Releases

    Science.gov (United States)

    Basili, Victor; Briand, Lionel; Condon, Steven; Kim, Yong-Mi; Melo, Walcelio L.; Valett, Jon D.

    1996-01-01

    One of the major concerns of any maintenance organization is to understand and estimate the cost of maintenance releases of software systems. Planning the next release so as to maximize the increase in functionality and the improvement in quality are vital to successful maintenance management. The objective of this paper is to present the results of a case study in which an incremental approach was used to better understand the effort distribution of releases and build a predictive effort model for software maintenance releases. This study was conducted in the Flight Dynamics Division (FDD) of NASA Goddard Space Flight Center(GSFC). This paper presents three main results: 1) a predictive effort model developed for the FDD's software maintenance release process; 2) measurement-based lessons learned about the maintenance process in the FDD; and 3) a set of lessons learned about the establishment of a measurement-based software maintenance improvement program. In addition, this study provides insights and guidelines for obtaining similar results in other maintenance organizations.

  4. Providing Our Fellows in Training with Education on Inflammatory Bowel Disease Health Maintenance to Improve the Quality of Care in Our Health Care System.

    Science.gov (United States)

    Lee, Ann Joo; Kraemer, Dale F; Smotherman, Carmen; Eid, Emely

    2016-01-01

    Inflammatory bowel disease (IBD) quality measures were established in an effort to standardize IBD health care. Despite effort to improve clinical performance, considerable variations in practice still exist. To further improve IBD health care, we propose incorporating an in-service educational session on IBD health maintenance to provide trainees with increasing awareness and knowledge on IBD management. Fifty electronic medical charts were randomly selected, and the level of quality documentation was assessed for 15 core IBD quality measures. Data were reported as the percentage of charts meeting audit criteria (compliance score). Fellows then attended an in-service educational session to review IBD quality measures and reinforce practice expectations. A second audit was then performed on an additional 50 patient charts to determine whether documentation practices improved after the educational session. We found a positive correlation between an in-service educational session and fellows' compliance with IBD health maintenance. Overall, the fellows' compliance score increased by 18% (before intervention, 65%; after intervention, 83%; P bases for IBD health maintenance. Incorporating a standard curriculum on IBD health maintenance provides fellows in training with increased awareness and guidance on managing the unique preventive care needs of patients with IBD.

  5. Human Error Probability Assessment During Maintenance Activities of Marine Systems

    OpenAIRE

    Rabiul Islam; Faisal Khan; Rouzbeh Abbassi; Vikram Garaniya

    2018-01-01

    Background: Maintenance operations on-board ships are highly demanding. Maintenance operations are intensive activities requiring high man–machine interactions in challenging and evolving conditions. The evolving conditions are weather conditions, workplace temperature, ship motion, noise and vibration, and workload and stress. For example, extreme weather condition affects seafarers' performance, increasing the chances of error, and, consequently, can cause injuries or fatalities to personne...

  6. The application of manipulator robot for nuclear plant maintenance

    International Nuclear Information System (INIS)

    Kohata, Yukifumi; Fujita, Jun; Onishi, Ken; Tsuhari, Hiroyuki; Hosoe, Fumihiro

    2010-01-01

    In the maintenance works at nuclear power plant, robots are used because of high radiation, narrow space and underwater work. Various robots are needed because there is various maintenance works. This is inefficiency. As the solutions, we developed manipulator robots for the access of specialized tools. This study shows manipulator robots developed by MHI, application example to maintenance works and effectiveness of manipulator robots. When robotization of maintenance works are considered, manipulator technology is very effective solution means. We achieved efficiency improvement and the reliability improvement by developing a high generality manipulator. (author)

  7. Proceedings of the third international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1995-01-01

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately

  8. Proceedings of the third international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately.

  9. American Board of Radiology Maintenance of Certification-Part IV: Practice Quality Improvement for Radiation Oncology

    International Nuclear Information System (INIS)

    Kun, Larry E.; Haffty, Bruce G.; Bosma, Jennifer; Strife, Janet L.; Hattery, Robert R.

    2007-01-01

    Maintenance of Certification is a physician-based response to public concerns about the quality of medical care and physician competency in a rapidly evolving, technically demanding specialty. American Board of Radiology (ABR) has previously described the first three components of the Maintenance of Certification. The ABR is currently developing a program in practice performance, completing Part IV of the competencies. The Practice Quality Improvement (PQI) program is meant to critically evaluate meaningful aspects of a physician's practice in a simple manner, using identifiable metrics and self-assessment to include an action plan for quality improvement. Each diplomate will be expected to complete three PQI projects during a full 10-year Maintenance of Certification cycle. Current diplomates with time-limited certificates will find prorated requirements determined by their year of certification on the ABR Website. Diplomates will have the option of completing zero to two Type I PQI projects (assessing factors relevant to clinical practice by peer review and self-reporting) and one to three Type II projects (i.e., at least one Type II projects of the three required, assessing parameters of practice by comparison with evidence-based guidelines, consensus statements, or peer comparisons; Type II projects are initiated and managed by professional societies). Several examples of Type I projects that might be offered by societies or directly through the ABR are provided, as well as highlights of the two Type II projects that have sought ABR qualification: American Society for Therapeutic Radiology and Oncology's Performance Assessment for the Advancement of Radiation Oncology Treatment program and American College of Radiology's RO-PEER program. An additional objective of the PQI is to develop national databases for future reference using aggregate data from the PQI projects

  10. A Self-Evaluation Tool for Development of Maintenance Personnel's Competences

    International Nuclear Information System (INIS)

    Piirto, A.; Paajanen, P.; Kantola, J.; Vanharanta, H.

    2007-01-01

    Teollisuuden Voima Oy (TVO) operates Olkiluoto nuclear power plant, which consists of twin 840 MWe BWR units. The first nuclear power plant unit, Olkiluoto 1, was connected to the national grid in September 1978 and the second almost identical unit, Olkiluoto 2, in February 1980. The construction of the third 1600 MWe PWR unit, Olkiluoto 3, was started in the spring 2005. The commercial operation of the new unit will start in 2009. The operation results of TVO's nuclear power plant units have been among the best ones in the world. The operational success is primary attributable to the early elimination of technical problems and preparation for defects beforehand. Also development of outage planning, maintenance methods and a low rate of disturbances have been very significant in achieving good operation results. TVO's long-term goals in operation and maintenance are: - keeping the load factor over 90 % and avoiding operational disturbances; - keeping the technical condition of the plant units 'as new'; - continuous learning and development of operation and maintenance functions; - decreasing the production costs. These goals also set requirements for maintenance personnel's competences. The high-grade competence of maintenance personnel has an effect on safe and reliable nuclear power plant operation. However, as a concept, safety is not always easy to define. A high level of safety is the result of the complex interaction of good design, operational safety and human performance: A set of indicators which are designed to monitor all aspects of operational safety performance are needed to form a total picture of the safe plant operation. In the framework six key areas of improvement of nuclear safety are defined. These key areas of improvement are based on the vision that the plant operates with low risk. Implementation of the actions will result in direct and permanent positive impact on plant nuclear safety and safety culture. The information gained from

  11. Maintenance of radiation monitoring systems

    International Nuclear Information System (INIS)

    Aoyama, Kei

    2001-01-01

    As the safety and quality of atomic power facilities are more strongly required, the reliability improvement and preventive maintenance of radiation monitoring systems are important. This paper describes the maintenance of radiation monitoring systems delivered by Fuji Electric and the present status of preventive maintenance technology. Also it introduces the case that we developed a fault diagnosis function adopting a statistics technique and artificial intelligence (AI) and delivered a radiation monitoring system including this function. This system can output a fault analysis result and a countermeasure from the computer in real time. (author)

  12. A development of maintenance educational support method by using navigation method. Pt. 2. A basic design of RHR pump maintenance educational support prototype system

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo

    2002-01-01

    The nuclear power plant has the human error produced from the disagreement of the difficulty of systematic error and maintenance work and the work execution capability, such as the persons concerned, which are produced from the fault of the command and the chain of command concerning organization. Then, this research establishes the new maintenance educational support prototype system for aiming at organization as Trinity (a supervision person, a construction person in charge, a work person in charge, and group length) , and improvement in human reliability for the purpose of aiming at before hand prevention of a systematic error, human error, and the accident and a trouble. Main results (I) In this research, as a result of investigating and analyzing about an exchange of the information which exists between the Trinity of concerning maintenance work execution, it became clear that the command and the chain of command for job execution exist among 3 persons. (Fig. 1) It will consider as the index for establishment of this command and chain of command of the maintenance educational support method from now on. (2) The basic design was performed on the educator's-ed position-and-rank level' about the 'prototype system' which enables suitable educational support. (Fig. 2) Its feature are as follows. (I) Presumption of the mismatch portion concerning the position-and-rank level / work execution capability before and behind the education by the initial educational scenario concerning an organization / on-site work, and education, (2) Implementation of reeducation by the 'reeducation scenario' concerning the organization / on-site work for complementing and canceling the mismatch portion. (3) Implementation of the comprehensive judgment (the educational effect) by analysis of the contents of a reply (conversation) of the educator-ed in reeducation scenario process. By this research, the possibility of the self-recognition of the problem of self or weak points (knowledge

  13. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  14. Development of advanced human-machine system for plant operation and maintenance

    International Nuclear Information System (INIS)

    Wu, Wei; Ohi, Tadashi; Yoshikawa, Hidekazu; Sawaragi, Tetsuo; Kitamura, Masaharu; Furuta, Kazuo; Gofuku, Akio; Ito, Koji

    2004-01-01

    With the worldwide deregulation of the power industry, and the aging of the nuclear power plants (NPPs), concerns are growing over the reliability and safety of the NPPs, because the regulation of man power may lower the current high level of reliability and safety. In this paper, a concept of overall integrated plant management mechanism is proposed, in order to meet the requirements of cutting costs of NPPs and the requirements of maintaining or increasing safety and reliability. The concept is called as satellite operation maintenance center (SOMC). SOMC integrates the operation and maintenance activities of several NPP units by utilizing advanced information technologies to support cooperation activities between workers allocated at SOMC and the field workers. As for the operation activities, a framework called as Advanced Operation System (AOS) is proposed in this paper. AOS consists of three support sub-systems: dynamic operation permission system(DyOPS), supervisor information presentation system using interface agent, and crew performance evaluation system. As for the maintenance activities, a framework called as Ubiquitous-Computing-based Maintenance support System (UCMS) is proposed next. Two case studies are described, in order to show the way of how UCMS support field workers to do maintenance tasks efficiently, safely, and infallibly as well. Finally, a prospect of SOMC is shown in order to explain the way of how the technology elements developed in this project could be integrated as a whole one system to support maintenance activities of NPPs in the future. (author)

  15. Knowledge engineering thinking of maintenance

    International Nuclear Information System (INIS)

    2007-01-01

    Maintenance optimization problem could not always settled mathematically and was obliged to use quasi-optimum solution with omitting non-formulated limiting condition or neglecting part of optimization object. In such a case knowledge engineering thinking was encouraged. Maintenance of complicated plant and artificial system should be considered from artificial object (equipment/facility hardware and system), technical information and knowledge base, and organizational and human aspect or society and institution. Comprehensive management system in organization and society was necessary not only for assuring integrity of equipment but also for attaining higher performance, reliability and economics of system. For better judgment it was important to share mechanism to make use of more information with organization or whole society. It was required to create database and data mining for knowledge base management system of maintenance. Maintenance was called 'last fortress' to assure quality such as reliability and safety of required function of equipment. Strategic approach to develop maintenance technology under cooperation was considered. Life extension R and D road map was launched in 2005. (T. Tanaka)

  16. Cost savings from performance-based maintenance contracting

    NARCIS (Netherlands)

    Straub, A.

    2009-01-01

    New procurement approaches combined with performance-based building approaches should reduce costs, but empirical qualitative and quantitative studies are lacking. Performance-based maintenance contracts give maintenance suppliers incentives to improve their way of working. Innovative,

  17. Time since injury limits but does not prevent improvement and maintenance of gains in balance in chronic stroke.

    Science.gov (United States)

    Llorens, Roberto; Noé, Enrique; Alcañiz, Mariano; Deutsch, Judith E

    2018-01-01

    To determine the influence of time since injury on the efficacy and maintenance of gains of rehabilitation of balance after stroke. Forty-seven participants were assigned to a least (6-12 months), a moderate (12-24 months), or a most chronic (>24 months) group. Participants trained for 20 one-hour sessions, administered three to five times a week, combining conventional physical therapy and visual feedback-based exercises that trained the ankle and hip strategies. Participants were assessed before, after the intervention, and one month later with a posturography test (Sway Speed and Limits of Stability) and clinical scales. In contrast to other subjects, the most chronic participants failed to improve their sway and to maintain the benefits detected in the Limits of Stability after the intervention. Although all the participants improved in those clinical tests that better matched the trained skills, time since injury limited the improvement, and over all, the maintenance of gains. Time since injury limits but does not prevent improvement in chronic stages post-stroke, and this effect appears to be more pronounced with maintaining gains. These findings support that training duration and intensity as well as type of therapy may need to be adjusted based on time post-stroke.

  18. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  19. Introducing artificial depth cues to improve task performance in ITER maintenance actions

    NARCIS (Netherlands)

    Heemskerk, C.J.M.; Eendebak, P.T.; Schropp, G.Y.R.; Hermes, H.V.; Elzendoorn, B.S.Q.; Magielsen, A.J.

    2013-01-01

    Maintenance operations on ITER tokamak components will be largely performed by remote handling. In previous work it was shown that representative maintenance tasks could be performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators

  20. Maintenance program decision-making utilizing crash data.

    Science.gov (United States)

    2013-07-01

    This document describes methods that may be used by UDOT Maintenance personnel to improve highway safety. Four programs have been recommended using crash data to make more informed decisions concerning maintenance programs as follows: : Snow & Ic...

  1. The maintenance management for lean organization

    OpenAIRE

    Daniel D. GEORGESCU

    2010-01-01

    The goal of lean maintenance approach is to maintain organization international competitiveness. In the spirit of continuously improvement, in the paper it is shown how by adjusting some Lean manufacturing specific techniques for Total Productive Maintenance (TPM) system, was born new maintenance system named Lean TPM. This is a systemic approach with three techniques, which don’t exclude specific techniques of TPM pillars, but complete them: the 7Ss as a critical first step in any improvemen...

  2. Excellence through maintenance mastering

    International Nuclear Information System (INIS)

    Lamarche, M.; Guillot, M.; Monier, M.

    1987-01-01

    To improve the overall availability factor of nuclear power plants you have to cut either the forced outage role and the planned outage time or you need to reduce simultaneously the failures and the efforts devoted to avoiding them. Among other results, this goal leads to a decrease in the number of real or anticipated problems. Electricite de France policy, in this matter, is to focus on decreasing the compoents' maintenance needs through a comprehensive modification program, targeted to eliminating the weak points as revealed by the operation. Thereby one may reach, for simple equipment, a nearly maintenance-free condition in which the only maintenance needed is surveillance, which provides assurance that everything is operating properly. A good example of this type of equipment is the family of static components, drums, and pipes whose corrective maintenance is almost nil when their initial condition is good

  3. Lean thinking for a maintenance process

    Directory of Open Access Journals (Sweden)

    Sherif Mostafa

    2015-01-01

    Full Text Available The maintenance process shares significant operating costs in an organisation. Lean thinking can be incorporated into maintenance activities through applying its principles and practices/tools. Lean maintenance (LM is a prerequisite for lean manufacturing systems. This research proposes a new structure for LM process based on a systematic literature review of a significant number of related articles that were published on LM. The process structure is designed based on the five lean principles to guide and support organisations to pursue maintenance excellence. This study establishes a scheme for LM tools that are structured into 2 level 4 bundles and 26 lean practices/tools and develops a House of Waste (HoW to demonstrate the association between maintenance wastes and the LM tools. With a successful accomplishment of the proposed scheme, the performance of a maintenance department can create more improvement opportunities over time to reach the maintenance excellence status.

  4. Failure: A Source of Progress in Maintenance and Design

    Science.gov (United States)

    Chaïb, R.; Taleb, M.; Benidir, M.; Verzea, I.; Bellaouar, A.

    This approach, allows using the failure as a source of progress in maintenance and design to detect the most critical components in equipment, to determine the priority order maintenance actions to lead and direct the exploitation procedure towards the most penalizing links in this equipment, even define the necessary changes and recommendations for future improvement. Thus, appreciate the pathological behaviour of the material and increase its availability, even increase its lifespan and improve its future design. In this context and in the light of these points, the failures are important in managing the maintenance function. Indeed, it has become important to understand the phenomena of failure and degradation of equipments in order to establish an appropriate maintenance policy for the rational use of mechanical components and move to the practice of proactive maintenance [1], do maintenance at the design [2].

  5. Human performance improvement for nuclear power plants

    International Nuclear Information System (INIS)

    2005-01-01

    The IAEA assists NPP operating organizations to improve plant performance through a focus on human performance improvement in areas like organizational and leadership development, senior management decision making, organization and management of HPI programmes including tools needed for effective HPI implementation, safety culture enhancement, knowledge management, personnel selection and staffing, career development, training and development, work design, scheduling and conditions, procedure and other job-aid development and use, effective communications, human performance monitoring, motivation. Many NPP operating organizations in Member States, are not yet achieving the full potential of their NPP technology/equipment regarding safety, operational or economic performance due to human performance weaknesses. The IAEA's HPI (Human Performance Improvement) services provide a means for these organizations to efficiently and effectively learn from international experts and the experiences of others in improving plant performance through human performance improvements. NPP operating organizations can benefit from these services in a number of ways, including requesting a national project, participating in a regional project, or requesting an assist visit. The types of activities provided through these services include assistance in benchmarking practices of successful organizations, providing information exchange and reviews of current practices through assist missions, conducting workshops on focused human performance topics, evaluating current human performance methods, including assistance in implementing self assessment programmes and providing support to safety culture enhancement programmes based on self-assessment

  6. Integrated reliability condition monitoring and maintenance of equipment

    CERN Document Server

    Osarenren, John

    2015-01-01

    Consider a Viable and Cost-Effective Platform for the Industries of the Future (IOF) Benefit from improved safety, performance, and product deliveries to your customers. Achieve a higher rate of equipment availability, performance, product quality, and reliability. Integrated Reliability: Condition Monitoring and Maintenance of Equipment incorporates reliable engineering and mathematical modeling to help you move toward sustainable development in reliability condition monitoring and maintenance. This text introduces a cost-effective integrated reliability growth monitor, integrated reliability degradation monitor, technological inheritance coefficient sensors, and a maintenance tool that supplies real-time information for predicting and preventing potential failures of manufacturing processes and equipment. The author highlights five key elements that are essential to any improvement program: improving overall equipment and part effectiveness, quality, and reliability; improving process performance with maint...

  7. 21 CFR 211.67 - Equipment cleaning and maintenance.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment cleaning and maintenance. 211.67 Section 211.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... Equipment cleaning and maintenance. (a) Equipment and utensils shall be cleaned, maintained, and, as...

  8. A Field Study of Scale Economies in Software Maintenance

    OpenAIRE

    Rajiv D. Banker; Sandra A. Slaughter

    1997-01-01

    Software maintenance is a major concern for organizations. Productivity gains in software maintenance can enable redeployment of Information Systems resources to other activities. Thus, it is important to understand how software maintenance productivity can be improved. In this study, we investigate the relationship between project size and software maintenance productivity. We explore scale economies in software maintenance by examining a number of software enhancement projects at a large fi...

  9. Evidence for a double dissociation of articulatory rehearsal and non-articulatory maintenance of phonological information in human verbal working memory.

    Science.gov (United States)

    Trost, Sarah; Gruber, Oliver

    2012-01-01

    Recent functional neuroimaging studies have provided evidence that human verbal working memory is represented by two complementary neural systems, a left lateralized premotor-parietal network implementing articulatory rehearsal and a presumably phylogenetically older bilateral anterior-prefrontal/inferior-parietal network subserving non-articulatory maintenance of phonological information. In order to corroborate these findings from functional neuroimaging, we performed a targeted behavioural study in patients with very selective and circumscribed brain lesions to key regions suggested to support these different subcomponents of human verbal working memory. Within a sample of over 500 neurological patients assessed with high-resolution structural magnetic resonance imaging, we identified 2 patients with corresponding brain lesions, one with an isolated lesion to Broca's area and the other with a selective lesion bilaterally to the anterior middle frontal gyrus. These 2 patients as well as groups of age-matched healthy controls performed two circuit-specific verbal working memory tasks. In this way, we systematically assessed the hypothesized selective behavioural effects of these brain lesions on the different subcomponents of verbal working memory in terms of a double dissociation. Confirming prior findings, the lesion to Broca's area led to reduced performance under articulatory rehearsal, whereas the non-articulatory maintenance of phonological information was unimpaired. Conversely, the bifrontopolar brain lesion was associated with impaired non-articulatory phonological working memory, whereas performance under articulatory rehearsal was unaffected. The present experimental neuropsychological study in patients with specific and circumscribed brain lesions confirms the hypothesized double dissociation of two complementary brain systems underlying verbal working memory in humans. In particular, the results demonstrate the functional relevance of the anterior

  10. The 2nd international conference on CANDU maintenance. Proceedings

    International Nuclear Information System (INIS)

    1992-01-01

    The conference mainly dealt with all aspects of the maintenance of CANDU power plants, but also included some papers on PWR plants, one on a coal-burning station, and one on robotics for fusion. Volume 1 includes sessions on the following topics: Plenary, Human performance, Maintenance planning and resourcing, Life cycle management, Maintenance cost evaluation and control, Use of special teams, Innovative maintenance techniques, Remote tooling, Reactivity maintenance, Reactor maintenance, Steam generator experience. Out of 34 papers listed under these sessions, one was published as an appendix to Vol. 2, two were published only as loose papers in a virtual supplement, and nine were not published in the proceedings at all. The individual papers have been abstracted separately

  11. Periodic imperfect preventive maintenance with two categories of competing failure modes

    Energy Technology Data Exchange (ETDEWEB)

    Zequeira, R.I. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: romulo.zequeira@utt.fr; Berenguer, C. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: christophe.berenguer@utt.fr

    2006-04-15

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists.

  12. Periodic imperfect preventive maintenance with two categories of competing failure modes

    International Nuclear Information System (INIS)

    Zequeira, R.I.; Berenguer, C.

    2006-01-01

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists

  13. A virtual reality intervention (Second Life) to improve weight maintenance: Rationale and design for an 18-month randomized trial.

    Science.gov (United States)

    Sullivan, D K; Goetz, J R; Gibson, C A; Mayo, M S; Washburn, R A; Lee, Y; Ptomey, L T; Donnelly, J E

    2016-01-01

    Despite the plethora of weight loss programs available in the US, the prevalence of overweight and obesity (BMI≥25kg/m(2)) among US adults continues to rise at least, in part, due to the high probability of weight regain following weight loss. Thus, the development and evaluation of novel interventions designed to improve weight maintenance are clearly needed. Virtual reality environments offer a promising platform for delivering weight maintenance interventions as they provide rapid feedback, learner experimentation, real-time personalized task selection and exploration. Utilizing virtual reality during weight maintenance allows individuals to engage in repeated experiential learning, practice skills, and participate in real-life scenarios without real-life repercussions, which may diminish weight regain. We will conduct an 18-month effectiveness trial (6 months weight loss, 12 months weight maintenance) in 202 overweight/obese adults (BMI 25-44.9kg/m(2)). Participants who achieve ≥5% weight loss following a 6month weight loss intervention delivered by phone conference call will be randomized to weight maintenance interventions delivered by conference call or conducted in a virtual environment (Second Life®). The primary aim of the study is to compare weight change during maintenance between the phone conference call and virtual groups. Secondarily, potential mediators of weight change including energy and macronutrient intake, physical activity, consumption of fruits and vegetables, self-efficacy for both physical activity and diet, and attendance and completion of experiential learning assignments will also be assessed. Copyright © 2015 Elsevier Inc. All rights reserved.

  14. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  15. MOV predictive maintenance program at Darlington NGS

    International Nuclear Information System (INIS)

    Morrison, J.F.

    1992-01-01

    This paper details the Motor Operated Valve (MOV) Predictive Maintenance program at Darlington Nuclear Generating Station. The program encompasses the use of diagnostics tooling in conjunction with more standard maintenance techniques, with the goal of improving performance of MOV's. Problems encountered and solutions developed during the first two phases of this program are presented, along with proposed actions for the final trending phase of the program. This paper also touches on the preventive and corrective maintenance aspects of an overall MOV maintenance program. 6 refs., 6 tabs., 6 figs

  16. The operational challenge of remote maintenance

    International Nuclear Information System (INIS)

    Forsythe, L.

    2015-01-01

    Full text of publication follows. With the declining supply of fossil fuels that are used in power stations today, and the ongoing concern over climate change, nuclear fusion is one of the most promising options for generating large amounts of carbon-free energy in the future. Fuel supplies for fusion will be available for millions of years, with 1 kg of fusion fuel providing the same amount of energy as 10 thousand tonnes of fossil fuel. Unlike conventional fission reactors, the radioactive waste produced from fusion is short-lived, and will be safe to dispose of conventionally within 100 years. Although fusion has the huge advantage of being a carbon free energy source, there are complexities when it comes to maintaining the machine. Due to the nature of the fusion reaction, the components within the area of the reactor vacuum vessel become radioactive, which requires maintenance and modifications to be conducted remotely to protect human operators. Remote maintenance is the use of manipulators to carry out tasks in challenging or hostile environments, which would otherwise cause harm to humans. Remote handling slave manipulators do the work of a human by mimicking the movements from a master robotic manipulator that is controlled by a human operator. This means that remote handling can be used in many other areas other too, such as space; fission power plants; sub-sea; and nuclear material handling or in adverse environments such as: low or high temperature; chemically contaminated; combustible and low oxygen environments. Remote maintenance requires specialist engineers to take into consideration many aspects normally taken for granted when carrying out a task manually. Constraints such as the space around us; viewing and lighting; the human body's dexterity and flexibility; the weight and centre of gravity of tools and components, and how we securely grip and handle them; and access to fixings and fastenings. All these are factors that require careful

  17. Expert system for maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ito, Tetsuo; Kasahara, Takayasu; Watanabe, Takao; Matsuki, Tsutomu.

    1989-01-01

    The basic function of the expert system which supports the maintenance works such as the diagnosis of nuclear power plants and the planning of maintenance works was developed. For the maintenance of large scale plants like nuclear power plants, much manpower is required. Consequently, it has been desired to develop the system for improving the maintainability by utilizing the expertise and empirical knowledge of skilled engineers. This system comprises the subsystems for aiding plant diagnosis and maintenance work planning. The former diagnoses the contents of out of order based on the knowledge base, and thereafter, guides the method of taking measures using simulator. The latter establishes the plan by using the method of limiting branching together so that the maintenance works do not interfere mutually or do not affect the operation. Hereafter, it is intended to improve the man-machine condition and expand knowledge aiming at the practical use. The outline of the system, the constitution of subsystems, the example of plant diagnosis, the support of plant maintenance work planning and so on are reported. (K.I.)

  18. Environmental favourable foundries through maintenance activities

    Directory of Open Access Journals (Sweden)

    A. Saniuk

    2015-10-01

    Full Text Available Maintenance today contributes to the aim of sustainable development in society, including environmental and energy saving, safety and economical aspects. The main purpose of the paper is to present the role of maintenance in the realization of sustainable developing practices in a foundry industry. Maintenance offers numerous opportunities to reduce the influence of foundry processes on the natural environment and utilize resources more efficiently. Maintenance activities can help to reduce losses and thereby improve the efficiency of the processes used in the production of resources (e.g. raw materials, energy, etc., especially in areas such as: the choice of an appropriate strategy for the maintenance of machinery and equipment (e.g. reactive, preventive, proactive; inventory management of spare parts; lubrication management and management of technology media.

  19. Application and issues of online maintenance for equipment of nuclear power plants

    International Nuclear Information System (INIS)

    Higasa, Hisakazu

    2011-01-01

    The maintenance systems for long-term safety and repair costs reduction of equipment of nuclear power plants are stated. Planned maintenance contained the breakdown maintenance (BM) and the preventive maintenance, which consists of the time based maintenance (MBM) and the condition based maintenance (CBM). Explained are the characteristics of equipments, maintenance methods, maintenance solutions and the self-evaluation maintenance power, damage mechanism and solutions, and monitoring tools and application. Stated are the maintenance system and application of monitoring technology, periodical maintenance, application of diagnosis, vibration monitoring techniques, decision of vibration monitoring, and application of monitoring techniques for improvement of maintenance. Illustrated are realization of planned maintenance by reorganization of maintenance, a trend of maintenance of equipments, table of classified maintenance systems, change of maintenance program, maintenance data and investigation of damage mechanism, examples of self-evaluation maintenance power, examples of analysis of damage of parts of equipments, evaluation of rotating machines by vibration method, examples of results of diagnosis of bearing of rotating machines, online maintenance system of Asahi Kasei Engineering Corporation, degradation pattern of pomp, estimation of lifetime by total vibration and vibration on acceleration, and improvement of equipments. (S.Y.)

  20. Laboratory simulation of maintenance activity

    International Nuclear Information System (INIS)

    Kantowitz, B.H.

    1988-01-01

    Laboratory research in highly controlled settings can augment, but not replace, studies in plant or training center locations. A laboratory simulation involves abstraction of the human information processing and social interactions required in prototypical maintenance tasks. A variety of independent variables can be studied quickly, efficiently, and at relatively low cost. Sources of human error can be identified in terms of models of human perception, cognition, action, attention, and social/organizational processes. This paper discusses research in progress at the Battelle Human Performance Laboratory. Both theoretical aspects and practical implications are considered. Directions for future human factors research are indicated

  1. Autonomous and professional maintenance in metallurgical enterprise as activities within total productive maintenance

    Directory of Open Access Journals (Sweden)

    B. Gajdzik

    2014-04-01

    Full Text Available The content of this publication consists of notions connected with Total Productive Maintenance (TPM in metallurgical enterprise. The basic areas of devices condition management through Autonomous and Professional Maintenance are described here. Mentioned areas of activities are performed in metallurgical enterprise ArcelorMittal Poland within pillars of World Class Manufacturing (WCM. The aims of UR programs are to maintain the basic functionality of the devices and decrease the number of failures in order to reach improvement of production efficiency.

  2. Technologies for improving current and future light water reactor operation and maintenance: Development on the basis of experience. Proceedings of a technical committee meeting

    International Nuclear Information System (INIS)

    2000-09-01

    Application of efficient technologies for improving operation and maintenance of nuclear power plants is an important element for assuring their economic competitiveness with other means of generating electricity. The competitive environment, which nuclear power plant operators face in many countries as a result of de-regulation of the electricity market, imposes cost pressures that must be met while at the same time satisfying stringent safety requirements. Further, as currently operating plants age, proper management includes development and application of better technologies for inspection, maintenance and repair. For future plants, the opportunity exists during the design phase to incorporate design features for performing efficient inspection, maintenance and repairs. Despite the prevailing low prices of fossil fuels, the generation costs of nuclear electricity continue to be competitive with electricity generation costs from fossil-fuelled plants for base load generation in several countries. For nuclear power, the capital investment component of electricity generation cost is relatively high, while the nuclear fuel cycle cost is - and is expected to remain - relatively low. The prices of fossil fuels are fairly low today but are likely to increase over the long term because the resource is limited. Moreover, governments may introduce incentives to reduce the use of fossil fuels in order to protect the environment. In many countries, nuclear utilities are experiencing increased competition with other sources of electricity production due to deregulation of the electricity market, and nuclear plant operators can no longer pass along the generation costs to consumers through regulated electricity rates. This competitive environment has significant implications for plant operations to achieve efficient use of all resources, and to effectively manage plant activities including outages and maintenance. Over the past several years, steady improvements have been

  3. Technologies for improving current and future light water reactor operation and maintenance: Development on the basis of experience. Proceedings of a technical committee meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    Application of efficient technologies for improving operation and maintenance of nuclear power plants is an important element for assuring their economic competitiveness with other means of generating electricity. The competitive environment, which nuclear power plant operators face in many countries as a result of de-regulation of the electricity market, imposes cost pressures that must be met while at the same time satisfying stringent safety requirements. Further, as currently operating plants age, proper management includes development and application of better technologies for inspection, maintenance and repair. For future plants, the opportunity exists during the design phase to incorporate design features for performing efficient inspection, maintenance and repairs. Despite the prevailing low prices of fossil fuels, the generation costs of nuclear electricity continue to be competitive with electricity generation costs from fossil-fuelled plants for base load generation in several countries. For nuclear power, the capital investment component of electricity generation cost is relatively high, while the nuclear fuel cycle cost is - and is expected to remain - relatively low. The prices of fossil fuels are fairly low today but are likely to increase over the long term because the resource is limited. Moreover, governments may introduce incentives to reduce the use of fossil fuels in order to protect the environment. In many countries, nuclear utilities are experiencing increased competition with other sources of electricity production due to deregulation of the electricity market, and nuclear plant operators can no longer pass along the generation costs to consumers through regulated electricity rates. This competitive environment has significant implications for plant operations to achieve efficient use of all resources, and to effectively manage plant activities including outages and maintenance. Over the past several years, steady improvements have been

  4. Maintenance for life management

    International Nuclear Information System (INIS)

    Hevia, F.

    1997-01-01

    Life Management is based on the detection, monitoring and control of long-term degradation that affects individual plant components and important populations. Experience has shown that in many cases current maintenance practices do not attend to ageing directly; instead they deal with the consequences when it is already too late, when good Life Management is no longer practical. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to project against, monitor and mitigate ageing that can affect the safe and profitable operating life of the facility. New regulatory requirements for ageing monitoring and effective maintenance to ensure safety (Maintenance Rule) have made it even more necessary to implement the Maintenance Evaluation Programme to cope with ageing, and to integrate that tasks in both programmes to optimise effort and use of tools. This paper presents a brief description of the objectives and methodologies of these Programmes which has been applied to plants around the world and in Spain at the Garona and Vandellos II plants in Spain as part of the PIE project for developing a Remanent Life Evaluation System for nuclear power plants. (Author)

  5. Improved Human Erythropoiesis and Platelet Formation in Humanized NSGW41 Mice

    Directory of Open Access Journals (Sweden)

    Susann Rahmig

    2016-10-01

    Full Text Available Human erythro-megakaryopoiesis does not occur in humanized mouse models, preventing the in vivo analysis of human hematopoietic stem cell (HSC differentiation into these lineages in a surrogate host. Here we show that stably engrafted KIT-deficient NOD/SCID Il2rg−/− KitW41/W41 (NSGW41 mice support much improved human erythropoiesis and platelet formation compared with irradiated NSG recipients. Considerable numbers of human erythroblasts and mature thrombocytes are present in the bone marrow and blood, respectively. Morphology, composition, and enucleation capacity of de novo generated human erythroblasts in NSGW41 mice are comparable with those in human bone marrow. Overexpression of human erythropoietin showed no further improvement in human erythrocyte output, but depletion of macrophages led to the appearance of human erythrocytes in the blood. Human erythropoiesis up to normoblasts and platelet formation is fully supported in NSGW41 mice, allowing the analysis of human HSC differentiation into these lineages, the exploration of certain pathophysiologies, and the evaluation of gene therapeutic approaches.

  6. Expert system for compressor maintenance support; Sistema especialista para apoio a manutencao de compressores

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Jonny Carlos da [Universidade Federal de Santa Catarina (UFSC), Florianopolis, SC (Brazil). Dept. de Engenharia Mecanica; Caletti, Luciano [KEOHPS - Knowledge Engineering on Hydraulic and Pneumatic System, SC (Brazil); Luna, Paulo de T.M. [Universidade Regional de Blumenau - FURB, SC (Brazil)

    2004-07-01

    The performance of critical machines in industrial processes, such as compressors used in industrial plants, is fundamental for overall company operation. In this context, it becomes strategic the application of methods and tools to support the operation and maintenance of the most relevant process equipment. Among these computational tools are the Expert Systems, which aim to emulate the decision making process of human experts in a specific knowledge domain. In Oil and Gas domain, an example of such tools is the SEGRED project, which combines expert system techniques with dynamic simulation of transport and distribution natural gas networks. The SECOMP project, Expert System for Compressor Maintenance, is considered a spin-off of the SEGRED. Its objective is to develop an expert system to support maintenance activities, aiming to increase reliability, improve performance and reduce maintenance and operational costs. This article presents the first phase of the SECOMP project, which is related to the development of an expert system prototype for corrective maintenance of natural gas reciprocating compressors. The paper discusses the context of this knowledge domain, the prototype development and its potential contribution in an industrial environment. (author)

  7. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  8. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  9. A review of e-maintenance capabilities and challenges

    Directory of Open Access Journals (Sweden)

    Adolfo Crespo Marquez

    2008-02-01

    Full Text Available Within the era of e-manufacturing and e-business, e-maintenance provides the opportunity for a new maintenance generation. E-maintenance integrates existing telemaintenance principles, with web-services and modern e-collaboration principles. Collaboration allows not only to share and exchange information but also knowledge and (e-intelligence. This paper outlines the basic capabilities provided by e-maintenance to companies as well as describes emerging challenges to benefit from these new operational improvement opportunities

  10. Simulation based comparison of predictive maintenance policies

    NARCIS (Netherlands)

    Tinga, Tiedo; Janssen, R.H.P.; Steenbergen, R.; van Gelder, P.

    2013-01-01

    When an asset is operated in variable conditions, its operational efficiency can be improved significantly when the maintenance is performed in a dynamic manner. This means that variations in usage and operating environment are taken into account when deciding on the length of the maintenance

  11. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  12. Training of maintenance personnel

    International Nuclear Information System (INIS)

    Rabouhams, J.

    1986-01-01

    This lecture precises the method and means developed by EDF to ensure the training of maintenance personnel according to their initial educational background and their experience. The following points are treated: General organization of the training for maintenance personnel in PWR and GCR nuclear power stations and in Creys Malville fast breeder reactor; Basic nuclear training and pedagogical aids developed for this purpose; Specific training and training provided by contractors; complementary training taking into account the operation experience and feedback; Improvement of velocity, competence and safety during shut-down operations by adapted training. (orig.)

  13. Incarcerated intravenous heroin users: predictors of post-release utilization of methadone maintenance treatment.

    Science.gov (United States)

    Lin, Huang-Chi; Wang, Peng-Wei; Yang, Yi-Hsin; Tsai, Jih-Jin; Yen, Cheng-Fang

    2016-01-01

    Incarcerated intravenous heroin users have more problematic patterns of heroin use, but are less likely to access methadone maintenance treatment by their own initiative than heroin users in the community. The present study examined predictors for receiving methadone maintenance treatment post-release among incarcerated intravenous heroin users within a 24-month period. This cohort study recruited 315 incarcerated intravenous heroin users detained in 4 prisons in southern Taiwan and followed up within the 24-month period post-release. Cox proportional hazards regression analysis was applied to determine the predictive effects of sociodemographic and drug-use characteristics, attitude toward methadone maintenance treatment, human immunodeficiency virus serostatus, perceived family support, and depression for access to methadone maintenance treatment after release. There were 295 (93.7%) incarcerated intravenous heroin users released that entered the follow-up phase of the study. During the 24-month follow-up period, 50.8% of them received methadone maintenance treatment. After controlling for the effects of the detainment period before and after recruitment by Cox proportional hazards regression analysis, incarcerated intravenous heroin users who had positive human immunodeficiency virus serostatus (HR = 2.85, 95% CI = 1.80-4.52, p maintenance treatment before committal (HR = 1.94, 95% CI = 1.23-3.05, p maintenance treatment within the 24-month follow-up period. Positive human immunodeficiency virus serostatus with fully subsidized treatment and previous methadone maintenance treatment experiences predicted access of methadone maintenance treatment post-release. Strategies for getting familiar with methadone maintenance treatment during detainment, including providing methadone maintenance treatment prior to release and lowering the economic burden of receiving treatment, may facilitate entry of methadone maintenance treatment for incarcerated intravenous heroin

  14. Tutoring electronic troubleshooting in a simulated maintenance work environment

    Science.gov (United States)

    Gott, Sherrie P.

    1987-01-01

    A series of intelligent tutoring systems, or intelligent maintenance simulators, is being developed based on expert and novice problem solving data. A graded series of authentic troubleshooting problems provides the curriculum, and adaptive instructional treatments foster active learning in trainees who engage in extensive fault isolation practice and thus in conditionalizing what they know. A proof of concept training study involving human tutoring was conducted as a precursor to the computer tutors to assess this integrated, problem based approach to task analysis and instruction. Statistically significant improvements in apprentice technicians' troubleshooting efficiency were achieved after approximately six hours of training.

  15. Current problems and perspectives of maintenance at NPPs

    International Nuclear Information System (INIS)

    Hevia Ruperez, F.; Garcia, R.; Manso Osuna, R.

    1994-01-01

    The highest levels of availability and efficiency for a plant in service, together with other, not less important, objectives such as improving plant safety, reliability and operability cannot be achieved if there is no adequate maintenance of plant systems and equipment. The combination of the large number of such system and equipment, diversity of their design, complexity of their interrelations and operation and maintenance requirements, make it difficult at times to obtain the right degree of technical and economic effectiveness. From the regulatory point of view, mention must be made of the Maintenance Rule (10/CFR/50.65) entitled ''Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants'' published on 10 July 1991 by the NRC. This Rule will come into force in the USA in 1996. This paper presents, on the one hand, a general view of the current status of NPP maintenance, enumerating the problems, difficulties and complications affecting its workability and, on the other, outlines new trends and methodologies (RAM, RCM, PRA, Remaining Lifetime Management, etc), for analysing and evaluating maintenance programmes, improving and optimizing them, and at the same time enhancing plant availability and lifetime. (Author)

  16. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  17. Thermoeconomic studies applied to maintenance of power plants

    International Nuclear Information System (INIS)

    Carvalho, F.R.; Horta Nogueira, L.A.

    1996-01-01

    The thermoeconomic method is an important tool aiming to improve maintenance activities in steam power plants, becoming possible to share the irreversibilities costs to each equipment, as boilers, turbines and heat exchangers. Furthermore, the effects related to changes in operational and design parameters can be studied in a detailed way, evaluating the local and distributed effects. In this work, after a brief review of power plant maintenance costs concepts and values, one address a methodology for maintenance costs estimation and develops a case study of thermoeconomics of a hypothetical plant, presenting the exergy flows, exergy losses and maintenance costs distribution. Also is presented an evaluation of exergoeconomic maintenance cost, evaluating their significance, at equipment level, related to overall maintenance cost, aiming to help the maintenance activities planning. 10 refs, 3 figs, 12 tabs

  18. Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    In order to increase Member States capabilities in utilizing good engineering and management practices the Agency has developed a series of Technical Documents (TECDOCs) to describe best practices and members experience in the application of them. This TECDOC describes the concept of Reliability Centred Maintenance (RCM) which is the term used to describe a systematic approach to the evaluation, design and development of cost effective maintenance programmes for plant and equipment. The concept has been in existence for over 25 years originating in the civil aviation sector. This TECDOC supplements previous IAEA publications on the subject and seeks to reflect members experience in the application of the principles involved. The process focuses on the functionality of the plant and equipment and the critical failure mechanisms that could result in the loss of functionality. When employed effectively the process can result in the elimination of unnecessary maintenance activities and the identification and introduction of measures to address deficiencies in the maintenance programme. Overall the process can result in higher levels of reliability for the plant and equipment at reduced cost and demands on finite maintenance resources. The application of the process requires interaction between the operators and the maintenance practitioners which is often lacking in traditional maintenance programmes. The imposition of this discipline produces the added benefit of improved information flows between the key players in plant and equipment management with the result that maintenance activities and operational practices are better informed. This publication was produced within IAEA programme on nuclear power plants operating performance and life cycle management

  19. Evaluation of artillery equipment maintenance support capability based on grey clustering

    Science.gov (United States)

    Zhai, Mei-jie; Gao, Peng

    2017-12-01

    This paper, the theory and method of evaluating the capability of equipment maintenance support in China and abroad are studied, from the point of view of the combat task of artillery troops and the strategic attachment in the future military struggle. This paper establishes the framework of the evaluation Index system of the equipment maintenance support capability of the artillery units, and applies the grey clustering method to the evaluation of the equipment maintenance support capability of the artillery units, and finally evaluates the equipment maintenance and support capability of the artillery brigade as an example, and analyzes the evaluation results. This paper finds out the outstanding problems existing in the maintenance and support of military equipment, and puts forward some constructive suggestions, in order to improve the status of military equipment maintenance and support and improve the level of future equipment maintenance.

  20. Program plan for future regulatory activity in nuclear-power-plant maintenance

    International Nuclear Information System (INIS)

    Badalamente, R.V.

    1982-10-01

    The intent of this paper is to describe the results of a study of nuclear power plant (NPP) maintenance conducted by Battelle's Pacific Northwest Laboratories (PNL) for the Nuclear Regulatory Commission (NRC). The purpose of the study for the NRC was to determine problems affecting human performance in NPP maintenance, pinpoint those which adversely affect public health and safety, review strategies for overcoming the problems, and suggest the direction that regulatory activities should take. Results of the study were presented to the NRC (Division of Human Factors Safety) in the form of a recommended program plan for future regulatory activity in NPP maintenance

  1. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  2. New method of classifying human errors at nuclear power plants and the analysis results of applying this method to maintenance errors at domestic plants

    International Nuclear Information System (INIS)

    Takagawa, Kenichi; Miyazaki, Takamasa; Gofuku, Akio; Iida, Hiroyasu

    2007-01-01

    Since many of the adverse events that have occurred in nuclear power plants in Japan and abroad have been related to maintenance or operation, it is necessary to plan preventive measures based on detailed analyses of human errors made by maintenance workers or operators. Therefore, before planning preventive measures, we developed a new method of analyzing human errors. Since each human error is an unsafe action caused by some misjudgement made by a person, we decided to classify them into six categories according to the stage in the judgment process in which the error was made. By further classifying each error into either an omission-type or commission-type, we produced 12 categories of errors. Then, we divided them into the two categories of basic error tendencies and individual error tendencies, and categorized background factors into four categories: imperfect planning; imperfect facilities or tools; imperfect environment; and imperfect instructions or communication. We thus defined the factors in each category to make it easy to identify factors that caused the error. Then using this method, we studied the characteristics of human errors that involved maintenance workers and planners since many maintenance errors have occurred. Among the human errors made by workers (worker errors) during the implementation stage, the following three types were prevalent with approximately 80%: commission-type 'projection errors', omission-type comprehension errors' and commission type 'action errors'. The most common among the individual factors of worker errors was 'repetition or habit' (schema), based on the assumption of a typical situation, and the half number of the 'repetition or habit' cases (schema) were not influenced by any background factors. The most common background factor that contributed to the individual factor was 'imperfect work environment', followed by 'insufficient knowledge'. Approximately 80% of the individual factors were 'repetition or habit' or

  3. GRAPHICAL MODELS OF THE AIRCRAFT MAINTENANCE PROCESS

    Directory of Open Access Journals (Sweden)

    Stanislav Vladimirovich Daletskiy

    2017-01-01

    Full Text Available The aircraft maintenance is realized by a rapid sequence of maintenance organizational and technical states, its re- search and analysis are carried out by statistical methods. The maintenance process concludes aircraft technical states con- nected with the objective patterns of technical qualities changes of the aircraft as a maintenance object and organizational states which determine the subjective organization and planning process of aircraft using. The objective maintenance pro- cess is realized in Maintenance and Repair System which does not include maintenance organization and planning and is a set of related elements: aircraft, Maintenance and Repair measures, executors and documentation that sets rules of their interaction for maintaining of the aircraft reliability and readiness for flight. The aircraft organizational and technical states are considered, their characteristics and heuristic estimates of connection in knots and arcs of graphs and of aircraft organi- zational states during regular maintenance and at technical state failure are given. It is shown that in real conditions of air- craft maintenance, planned aircraft technical state control and maintenance control through it, is only defined by Mainte- nance and Repair conditions at a given Maintenance and Repair type and form structures, and correspondingly by setting principles of Maintenance and Repair work types to the execution, due to maintenance, by aircraft and all its units mainte- nance and reconstruction strategies. The realization of planned Maintenance and Repair process determines the one of the constant maintenance component. The proposed graphical models allow to reveal quantitative correlations between graph knots to improve maintenance processes by statistical research methods, what reduces manning, timetable and expenses for providing safe civil aviation aircraft maintenance.

  4. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  5. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  6. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    International Nuclear Information System (INIS)

    Cohen, Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-01-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O ampersand M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O ampersand M Improvement Program. O ampersand M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O ampersand M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O ampersand M costs was achieved. Based on the lessons learned, an optimum solar- field O ampersand M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O ampersand M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts

  7. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Cohen Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-06-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O&M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O&M Improvement Program. O&M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O&M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O&M costs was achieved. Based on the lessons learned, an optimum solar- field O&M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O&M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts.

  8. Development of methods for the evaluation and reduction of risk factors for the maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Preuss, W.; Ogurek, K.H.

    1988-01-01

    The maintenance of a nuclear power plant is an essential requirement for its safe operation. Recent experience has however revealed increasingly more deviations and disturbances associated with maintenance work - in particular related to human error. The investigations should contribute to the further improvement of the conditions for safe and optimal maintenance procedures and thus minimize the risk of disturbances arising from them. The first step of the investigation is presented here, in which the methodological preliminary work was carried out and a suitable procedure developed. A basis was provided by means of extensive literature research and analysis. Additional information was obtained through discussions with experts (research workers as well as plant operational management). In particular suitable techniques of investigation and analysis are presented in detail, the problem structure of the field of investigation bas been worked out, and a methodology for the evaluation of data has been developed. Furthermore criteria have been formulated with which nuclear power plants and maintenance processes can be choosen for an economic way of investigation, and a procedure is presented which serves the investigator to check and to improve the methodology. Finally, proposals for further investigations are given. (orig.) [de

  9. A marriage of tradition and new technology into a strategic plan for maintenance at Martin Marietta Energy Systems, Inc

    International Nuclear Information System (INIS)

    Miller, D.R.

    1992-01-01

    During the past several years, the management focus of US Department of Energy (DOE) contractors has sharpened to include an aggressive reassessment of facility support functions. A vast majority of DOE buildings and equipment are 30 to 40 years old. This presentation discusses the scope of the maintenance challenge and some of the strategic plans and actions now in progress. As a new DOE contractor, Energy Systems began to infuse a top-down management style into its operations approximately seven years ago. Previously, autonomous operations such as gaseous diffusion plants and the national laboratory were directed to follow more uniform policies and procedures. More recently, DOE's assessments and self-assessments of facilities have permitted a formal approach to the replacement of old equipment. In 1990 an Energy Systems corporate decision was made to bring a top-down approach to the performance of maintenance. A long standing corporate Maintenance Managers Committee was given a new charter. Representatives of all five Energy Systems sites were asked by top management to look ahead and identify appropriate strategic goals. These goals must assist the diverse operations to achieve more consistency and to use new technology to improve equipment reliability. Specific goals identified were increased safety to personnel, extended equipment life, increased overall productive time, improved product quality, and greater cost effectiveness of maintenance efforts. Yet another area of interest and search for innovation is in human resource development. Traditionally, human resource development in maintenance has focused on academic advancement for salaried staff and unrelated task or safety training for hourly staff. In the future, training and education for all employees will be better coordinated to achieve the overall goals

  10. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  11. Long-term development of nuclear maintenance service provider in Slovenia

    International Nuclear Information System (INIS)

    Androjna, A.; Racic, Z.; Balazic, D.

    2004-01-01

    In recent years, most utilities have been facing a challenge of optimizing maintenance costs, while maintaining or improving equipment reliability. As the equipment ages and maintenance skills within the plant staff may decline due to a generation exchange, the challenge becomes even stronger. Consequently, many plants are looking for possible solutions through partnering with maintenance service providers. The fact that there is only one nuclear power plant in Slovenia hinders the development of local maintenance contractors to some extent. Additionally, they have to face everincreasing technical and organizational requirements while a longer fuel cycle and shorter outage durations result in a narrower annual scope of outage activities. In such circumstances, it may be very difficult for local maintenance service providers to retain and improve skills and qualifications in the long run. Even more so, since they also face the need to rejuvenate their staff and the interest of subcontractors to participate diminishes. The paper presents a case on long-term development issues as experienced by NUMIP, the leading Slovenian nuclear maintenance service provider. Above all, we would like to contribute to a better understanding of efficient local maintenance support. NUMIP's future strategic options are explored in light of possible partnering relationship with the nuclear power plant, based on trust, win-win attitude and continuous improvement. Long-term benefits of the proposed partnering are indicated for both parties, the nuclear power plant and the local maintenance service provider. (author)

  12. Energy efficient maintenance. Project report; Energioptimerende vedligehold. Projektrapport

    Energy Technology Data Exchange (ETDEWEB)

    Bjerg, J. (Center for Drift og Vedligehold, Frederici (Denmark)); Dam Wied, M.; Skjershede Nielsen, P.; Holt, J. (NRGi Raadgivning A/S, Aarhus (Denmark)); Dam, M. (Energi Horsens, Horsens (Denmark)); Holk Lauridsen, V. (Teknologisk Institut, Energieffektivisering og Ventilation, Taastrup (Denmark))

    2010-03-15

    Together with four case companies, the project developed and tested a model for energy-efficient maintenance. In each of the companies, the model was adjusted through a cooperation process aiming at combining energy optimisation and maintenance as part of specific production optimisation. When correctly planned, energy-efficient maintenance is interesting for all companies. An overall solution was made, which can facilitate major energy savings and production efficiency improvement. (LN)

  13. Expanding Educators' Contributions to Continuous Quality Improvement of American Board of Medical Specialties Maintenance of Certification.

    Science.gov (United States)

    Nora, Lois Margaret; Pouwels, Mellie Villahermosa; Irons, Mira

    2016-01-01

    The American Board of Medical Specialties board certification has transformed into a career-long process of learning, assessment, and performance improvement through its Program for Maintenance of Certification (MOC). Medical educators across many medical professional organizations, specialty societies, and other institutions have played important roles in shaping MOC and tailoring its overarching framework to the needs of different specialties. This Commentary addresses potential barriers to engagement in work related to MOC for medical school (MS) and academic health center (AHC) educators and identifies reasons for, and ways to accomplish, greater involvement in this work. The authors present ways that medical and other health professions educators in these settings can contribute to the continuous improvement of the MOC program including developing educational and assessment activities, engaging in debate about MOC, linking MOC with institutional quality improvement activities, and pursuing MOC-related scholarship. MS- and AHC-based educators have much to offer this still-young and continually improving program, and their engagement is sought, necessary, and welcomed.

  14. Maintenance Management Systems in the Czech Enterprises of Chemical and Food Industries

    Directory of Open Access Journals (Sweden)

    Lenka Branska

    2016-12-01

    Full Text Available Purpose of the article: The aim of this article is to use the results of the qualitative research to describe the current form of maintenance systems used in enterprises of chemical and food industries, and then to discuss and generalize the results. Methodology/methods: The primary qualitative research was conducted in five companies, which can be regarded as typical representatives of the industries. The main objective of the primary research in individual companies was to determine how they perform the strategic and tactical operational planning of maintenance, implementation of these plans and their control. Individual interviews with respondents were used as the research method. The results of the research were processed using the content analysis method. Subsequently, comparison of the findings from individual businesses and subsequent synthesis thereof was performed, which allowed making generalizations. Scientific aim: The scientific aim of the article is to develop knowledge in the field of maintenance management by specifying the form of the maintenance systems utilized in Czech enterprises of the chemical and food industries and identifying the main opportunities for their improvement. Findings: Czech enterprises of the chemical and food industries utilize maintenance management systems. These systems are aimed at prevention, emphasizing the planning of maintenance activities in fixed periodic intervals. Also, they often utilize diagnostic maintenance. However, the maintenance systems currently used cannot be considered fully operational, with regard to the relatively large volume of after-failure repairs. Conclusions: Production equipment maintenance systems are irreplaceable in chemical and food industry enterprises, but there is great potential for improvement. Improvement should be focused on the area of strategic as well as tactical and operational planning of production equipment maintenance. In terms of strategy, the biggest

  15. DNMT1 but not its interaction with the replication machinery is required for maintenance of DNA methylation in human cells

    Science.gov (United States)

    Spada, Fabio; Haemmer, Andrea; Kuch, David; Rothbauer, Ulrich; Schermelleh, Lothar; Kremmer, Elisabeth; Carell, Thomas; Längst, Gernot; Leonhardt, Heinrich

    2007-01-01

    DNA methylation plays a central role in the epigenetic regulation of gene expression in vertebrates. Genetic and biochemical data indicated that DNA methyltransferase 1 (Dnmt1) is indispensable for the maintenance of DNA methylation patterns in mice, but targeting of the DNMT1 locus in human HCT116 tumor cells had only minor effects on genomic methylation and cell viability. In this study, we identified an alternative splicing in these cells that bypasses the disrupting selective marker and results in a catalytically active DNMT1 protein lacking the proliferating cell nuclear antigen–binding domain required for association with the replication machinery. Using a mechanism-based trapping assay, we show that this truncated DNMT1 protein displays only twofold reduced postreplicative DNA methylation maintenance activity in vivo. RNA interference–mediated knockdown of this truncated DNMT1 results in global genomic hypomethylation and cell death. These results indicate that DNMT1 is essential in mouse and human cells, but direct coupling of the replication of genetic and epigenetic information is not strictly required. PMID:17312023

  16. Status of the reliability centered maintenance program at Ontario Hydro's Bruce 'A' Nuclear Division

    International Nuclear Information System (INIS)

    Khan, I.

    1995-01-01

    Bruce A started a preventive maintenance (PM) quality improvement program in August of 1991. This initiative was taken to address the concerns expressed by the AECB and the Peer Audits finding. The concerns were on the quality of the Bruce A PM Program and its execution in the field. Reliability Centered Maintenance (RCM) analysis was selected as the PM program quality improvement and optimization technique. Therefore, RCM became a key component of Bruce A's Integrated PM program and maintenance strategy. As a result of RCM implementation, and improvements in the work planning and scheduling process, Bruce A is seeing downward trends in the corrective maintenance work load, maintenance preventable forced outages, overdue/missed PM tasks and corrective maintenance backlog. Control Room Operators have reported observing an improvement in systems and equipment response to transients. Other benefits include a documented, controlled and traceable PM program. In addition, the team approach required by RCM has started to improve staff confidence in the PM program which, in turn, is improving the compliance with the PM program. (author)

  17. Tools to support maintenance strategies under soft soil conditions

    Directory of Open Access Journals (Sweden)

    J. W. M. Lambert

    2015-11-01

    Full Text Available Costs for maintenance of infrastructure in municipalities with soft soil underground conditions, are estimated to be almost 40 % higher than in others. As a result, these municipalities meet financial problems that cause overdue maintenance. In some cases municipalities are even afraid to be unable to offer a minimum service level in future. In common, traditional practice, roads and sewerage systems have been constructed in trenches that consist of sandy material that replaces the upper meters of the soft soil. Under influence of its weight, this causes accelerated settlements of the construction. A number of alternative constructions have been developed, e.g. using light-weight materials to limit settlement velocity. In order to limit future maintenance costs, improvement of maintenance strategies is desired. Tools have been and will be developed to support municipalities in improving their maintenance strategies and save money by doing that. A model (BALANS that weighs the attractiveness of alternative solutions under different soil, environmental and economic circumstances, will be presented.

  18. A method for accounting for maintenance costs in flux balance analysis improves the prediction of plant cell metabolic phenotypes under stress conditions.

    Science.gov (United States)

    Cheung, C Y Maurice; Williams, Thomas C R; Poolman, Mark G; Fell, David A; Ratcliffe, R George; Sweetlove, Lee J

    2013-09-01

    Flux balance models of metabolism generally utilize synthesis of biomass as the main determinant of intracellular fluxes. However, the biomass constraint alone is not sufficient to predict realistic fluxes in central heterotrophic metabolism of plant cells because of the major demand on the energy budget due to transport costs and cell maintenance. This major limitation can be addressed by incorporating transport steps into the metabolic model and by implementing a procedure that uses Pareto optimality analysis to explore the trade-off between ATP and NADPH production for maintenance. This leads to a method for predicting cell maintenance costs on the basis of the measured flux ratio between the oxidative steps of the oxidative pentose phosphate pathway and glycolysis. We show that accounting for transport and maintenance costs substantially improves the accuracy of fluxes predicted from a flux balance model of heterotrophic Arabidopsis cells in culture, irrespective of the objective function used in the analysis. Moreover, when the new method was applied to cells under control, elevated temperature and hyper-osmotic conditions, only elevated temperature led to a substantial increase in cell maintenance costs. It is concluded that the hyper-osmotic conditions tested did not impose a metabolic stress, in as much as the metabolic network is not forced to devote more resources to cell maintenance. © 2013 The Authors The Plant Journal © 2013 John Wiley & Sons Ltd.

  19. A Heuristic for Improving Legacy Software Quality during Maintenance: An Empirical Case Study

    Science.gov (United States)

    Sale, Michael John

    2017-01-01

    Many organizations depend on the functionality of mission-critical legacy software and the continued maintenance of this software is vital. Legacy software is defined here as software that contains no testing suite, is often foreign to the developer performing the maintenance, lacks meaningful documentation, and over time, has become difficult to…

  20. Human fetal liver stromal cells that overexpress bFGF support growth and maintenance of human embryonic stem cells.

    Directory of Open Access Journals (Sweden)

    Jiafei Xi

    Full Text Available In guiding hES cell technology toward the clinic, one key issue to be addressed is to culture and maintain hES cells much more safely and economically in large scale. In order to avoid using mouse embryonic fibroblasts (MEFs we isolated human fetal liver stromal cells (hFLSCs from 14 weeks human fetal liver as new human feeder cells. hFLSCs feeders could maintain hES cells for 15 passages (about 100 days. Basic fibroblast growth factor (bFGF is known to play an important role in promoting self-renewal of human embryonic stem (hES cells. So, we established transgenic hFLSCs that stably express bFGF by lentiviral vectors. These transgenic human feeder cells--bFGF-hFLSCs maintained the properties of H9 hES cells without supplementing with any exogenous growth factors. H9 hES cells culturing under these conditions maintained all hES cell features after prolonged culture, including the developmental potential to differentiate into representative tissues of all three embryonic germ layers, unlimited and undifferentiated proliferative ability, and maintenance of normal karyotype. Our results demonstrated that bFGF-hFLSCs feeder cells were central to establishing the signaling network among bFGF, insulin-like growth factor 2 (IGF-2, and transforming growth factor β (TGF-β, thereby providing the framework in which hES cells were instructed to self-renew or to differentiate. We also found that the conditioned medium of bFGF-hFLSCs could maintain the H9 hES cells under feeder-free conditions without supplementing with bFGF. Taken together, bFGF-hFLSCs had great potential as feeders for maintaining pluripotent hES cell lines more safely and economically.

  1. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  2. Reliability Centered Maintenance - Methodologies

    Science.gov (United States)

    Kammerer, Catherine C.

    2009-01-01

    Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

  3. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  4. Maintenance related to life management: Survey and control of equipment ageing

    International Nuclear Information System (INIS)

    Hevia Ruperez, F.

    2000-01-01

    The aim of this paper is to review relevant objectives and aspects of the Maintenance Evaluation and Improvement Programmes for Nuclear Power Plant Life Management. Recent experience shows that current maintenance practice often fails to directly address long-term degradation that affects singular plant components and equipment populations. Instead, delayed attention to the consequences makes good Life Management unfeasible. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to protect against, mitigate and/or monitor ageing that affects the safe, profitable life of the facility. The paper analyses the methodologies used, incidents during their application and the main conclusions reached from the implementation of these programmes in Spanish nuclear power plants. Special attention is paid to recommended solutions for improving the efficiency of the utility's contributions, its leadership in task development and integration, and its interfaces with organisations specialised in providing services that support Life Management Programmes. The coexistence of these and other similar maintenance programmes make it necessary to integrate tasks to optimise effort and tools. The paper analyses the guidelines to be considered when integrating these Programmes with other maintenance optimisation programmes (economy and feasibility, RCM) and with tasks derived from the application of Maintenance Rule regulatory requirements. Lastly, the paper reports on the state of these Maintenance Evaluation and Improvement Programmes, their development, what prospects they have, and the Industry's initiative and actions concerning the matter. (author)

  5. Trehalose improves cell proliferation and dehydration tolerance of human HaCaT cells

    Directory of Open Access Journals (Sweden)

    Lee Kyung Eun

    2015-01-01

    Full Text Available Trehalose is a disaccharide molecule that serves as a natural osmotic regulator in halophilic microorganisms and plants but not in mammals. We observed that human HaCaT cells supplied with trehalose improved cell proliferation and extended viability under dehydration. In HaCaT cells, in response to increasing concentrations of exogenous trehalose, the levels of heat shock protein (HSP 70 increased and matrix metalloproteinase (MMP 1 decreased. Proteome analysis of trehalose-treated HaCaT cells revealed remarkable increases in the levels of proteins involved in cell signaling and the cell cycle, including p21 activated kinase I, Sec I family domain protein and elongation factor G. Moreover, the proteins for cell stress resistance, tryptophan hydroxylase, serine/cysteine proteinase inhibitors and vitamin D receptors were also increased. In addition, the proteins responsible for the maintenance of the cytoskeleton and cellular structures including procollagen-lysine dioxygenase, vinculin and ezrin were increased. Proteomic data revealed that trehalose affected HaCaT cells by inducing the proteins involved in cell proliferation. These results suggest that trehalose improves the proliferation and dehydration tolerance of HaCaT cells by inducing proteins involved in cell growth and dehydration protection.

  6. Florida maintenance rating program (MRP) assessment and enhancement : final report, May 28, 2008.

    Science.gov (United States)

    2008-05-28

    The Maintenance Rating Program (MRP), developed in 1985 by FDOT, is a statewide maintenance system aimed : at evaluating the State highway maintenance conditions, and determining FDOT asset maintenance needs. In the : quest for continuous improvement...

  7. Development of a Field Management Standard for Improving Human Factors

    International Nuclear Information System (INIS)

    Yun, Young Su; Son, Il Moon; Son, Byung Chang; Kwak, Hyo Yean

    2009-07-01

    This project is to develop a management guideline for improving human performances as a part of the Human Factors Management System of Kori unit 1 which is managing all of human factors items such as man-machine system interfaces, work procedures, work environments, and human reliabilities in nuclear power plants. Human factors engineering includes an human factors suitability analysis and improvement of human works, an analysis of accidents by human error, an improvement of work environment, an establishment of human factors management rules and a development of human resources to manage and perform those things consistently. For assisting these human factors engineering tasks, we developed human factors management guidelines, checklists and work procedures to be used in staffing, qualification, training, and human information requirements and workload. We also provided a software tool for managing the above items. Additionally, contents and an item pool for a human factors qualifying examination and training programs were developed. A procedures improvement and a human factors V and V on the Kori unit 1 have been completed as a part of this project, too

  8. Present status of maintenance in nuclear power stations

    International Nuclear Information System (INIS)

    Fueki, Kensuke

    1982-01-01

    For nuclear power stations, the improvement of the rate of facility utilization is indispensable. As its means, the shortening of regular inspection period, the adoption of long term cycle operation, the shortening of plant shutdown period by the improvement of the reliability of installed equipment and so on are conceivable. In this paper, the maintenance techniques in nuclear power stations which constitute the basis of reliability improvement are explained. In nuclear power stations, the use of nuclear fuel, accordingly the existence of radioactivity are the remarkable features. At the time of an accident, the nuclear reaction in a reactor must be stopped, and the excessive heat must be removed. The radioactivity in nuclear fuel must not be released outside. The regular inspection of once a year is provided by the law, and routine tests are performed during normal operation. The check-up by operators also is a part of the safety measures. For the early detection of abnormality, the diagnosis system is developed, and the maintenance techniques during operation are examined for being taken into the safety test and standard. The improvement of reliability is attempted by the redundancy of systems. The activity of quality assurance, the organization for the maintenance of nuclear power stations and maintenance works, and the measures to raise the rate of operation are reported. (Kako, I.)

  9. Continuous improvement of operation and maintenance conditions of french PWR nuclear islands

    International Nuclear Information System (INIS)

    Bitsch, D.

    1985-05-01

    Improvement of the nuclear island design, to facilitate maintenance and working conditions during plant shutdown, has been a subject of particular attention within the French PWR program. Standardization and industrial concentration created an unusually favourable context for approaching this objective. Progress efforts supported by the feedback of actual operating experience were pursued in the areas of plant layout-equipment installation, and on the design and technology of the component themselves. The progress efforts on the design and technology of the components were pursued along several paths including: - the resistance increase of specific parts submitted to various forms of in-service damage, - the reduction of the extent and duration of work during plant outages and - the reduction of the Occupational Radiation Exposure (ORE), one of the most important axes of development, through the appropriate selection of less releasing materials, the implementation of more efficient decontamination systems and by the use of robots

  10. Road Maintenance in Africa: Approaches and Perspectives

    Directory of Open Access Journals (Sweden)

    M Mostafa Hassan

    2018-01-01

    Full Text Available In Africa, roads are the dominant mode of passenger and freight transport, for which the need is growing rapidly. It is noticeable that most of the African countries do not do enough to ensure the sustainability of road infrastructure as it has been widely reported that roads are affected, to varying degrees, by premature deterioration. Most of the African countries have adopted institutional reforms, notably entailing the creation of road funds and road agencies, and made significant progress on road maintenance. However, many challenges remain to be addressed in all of them to ensure appropriate maintenance. Although spending on road maintenance has increased over time in all African countries it remains insufficient to cover the needs. Poorly maintained roads constrain mobility, significantly raise vehicle operating costs, increase accident rates and their associated human and property costs, and aggravate isolation, poverty, poor health, and illiteracy in rural communities. This paper focuses, in particular, on road maintenance in some African countries considering types of road maintenance and the different approaches aiming at a comparison to reflect on similarities and differences.

  11. Road Maintenance in Africa: Approaches and Perspectives

    Science.gov (United States)

    M, Mostafa Hassan

    2018-06-01

    In Africa, roads are the dominant mode of passenger and freight transport, for which the need is growing rapidly. It is noticeable that most of the African countries do not do enough to ensure the sustainability of road infrastructure as it has been widely reported that roads are affected, to varying degrees, by premature deterioration. Most of the African countries have adopted institutional reforms, notably entailing the creation of road funds and road agencies, and made significant progress on road maintenance. However, many challenges remain to be addressed in all of them to ensure appropriate maintenance. Although spending on road maintenance has increased over time in all African countries it remains insufficient to cover the needs. Poorly maintained roads constrain mobility, significantly raise vehicle operating costs, increase accident rates and their associated human and property costs, and aggravate isolation, poverty, poor health, and illiteracy in rural communities. This paper focuses, in particular, on road maintenance in some African countries considering types of road maintenance and the different approaches aiming at a comparison to reflect on similarities and differences.

  12. Maintenance policy of the nuclear park

    International Nuclear Information System (INIS)

    Teisset, J.M.

    1995-01-01

    The nuclear installations maintenance policy of Electricite de France (EDF) follows three axes: first, controlling the aging of the production tool to warrant the safety and the functional reliability during the 40 years of installations service life. Second: optimizing the maintenance activities taking into account the safety goals, costs, security, dosimetry, duration of outages, and intervention conditions in the decisions. Third: developing a real partnership with contractors. EDF has decided to decentralize its maintenance operations towards each unit which is in charge of the organization of its own project. A better management of the contractor personnel has allowed to increase the performances of maintenance operations. The development of long-term agreements with contractors has permitted to reinforce the qualification, the responsibility and the efficiency of the personnel and to improve their means and tools. (J.S.). 1 photo

  13. Applying principles of Design For Assembly to ITER maintenance operations

    International Nuclear Information System (INIS)

    Heemskerk, Cock; de Baar, Marco; Elzendoorn, Ben; Koning, Jarich; Verhoeven, Toon; Vreede, Fred de

    2009-01-01

    In ITER, maintenance operations in the vessel and in the Hot Cell will be largely done by Remote Handling (RH). Remotely performed maintenance actions tend to be more time-costly than actions performed by direct human access. With a human operator in the control loop and adequate situational feedback, a two-armed master slave manipulator system can mimic direct access with dexterous manipulation, tactile feedback and vision. But even then, turnaround times are still very high. Adapting the design for simplified maintenance operations can yield significant time savings. One of the methods known to produce a simpler, more robust design, which is also better suited for handling with robots, is Design For Assembly (DFA). This paper discusses whether and how the principles of DFA can be applied to simplify maintenance operations for ITER. While DFA is normally used with series-production and ITER is a unique product, it is possible to apply the principles of DFA to ITER maintenance operations. Furthermore, DFA's principles can be applied at different abstraction levels. Combining principles of DFA with Virtual Reality leads to new insights and provides additional value.

  14. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  15. 6. CNS international conference on CANDU maintenance. Proceedings

    International Nuclear Information System (INIS)

    2003-01-01

    The 6th CNS International Conference on CANDU Maintenance took place in Toronto, Ontario on November 16-18, 2003. The theme for the conference was 'Maintenance for Life'. About 270 delegates attended the conference held by the Canadian Nuclear Society. The conference consisted of four parallel sessions, a pattern that continued throughout the conference. Papers were grouped under the following headings: Fuel Channels and End Fittings - Assessments; Fuel Channels and End Fittings - Inspections; Fuel Channels and End Fittings - Maintenance; Fuel Channels and End Fittings - Universal Delivery Machine; Water Upgrading; Performance and Plant Life Improvement; Steam Generator Life Management; Steam Generator Modifications; Steam Generators - Inspections; Steam Generators - Assessments; Maintenance Programs; Feeder Inspections; Feeder Assessment and Mitigation; Valve Maintenance; Instrumentation and Control; Inspection Technology; and Fuel Handling

  16. Qualitative study on maintenance management in Moroccan industries

    Science.gov (United States)

    Naji, Amal; El Oumami, Mohamed; Bouksour, Otmane; Beidouri, Zitouni

    2018-05-01

    Maintenance management is, and has been studied in depth, especially for strategies to be implemented in industry, even though, authors note that there is a gap between literature and management adopted by industries. In this paper, we present a qualitative study in five Moroccan industries to investigate “how maintenance is managed” rather than “how it should be”. The questionnaire utilized for the study consists on semi-structured and open-ended questions. We consider factors and variables related to maintenance management and we explore the relationships between those factors. The original contribution of this paper is to provide a «real view »about maintenance management in Moroccan industries, which could help to improve understanding of barriers to implementing maintenance strategy.

  17. Utilization of information and communications technology (ICT) to improve workface efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Haines, A.; Rasmussen, J. [Industrial Audit Corp., Toronto, Ontario (Canada)

    2010-07-01

    Improving the efficiency of personnel at the workface is a key objective for executing construction, maintenance, quality, engineering and human performance activities. Schedule and cost overruns have a significant impact on the bottom line and on future business efficiency in execution of tasks is paramount to success. Leveraging information and communications technology (ICT) in construction, maintenance and operation environments can create a mobile workforce where personnel efficiency is improved, significant gains are made on schedule and cost, and the overall quality of work is raised. This paper will discuss the impact of mobile technology specifically on workface efficiency and productivity. (author)

  18. Utilization of information and communications technology (ICT) to improve workface efficiency

    International Nuclear Information System (INIS)

    Haines, A.; Rasmussen, J.

    2010-01-01

    Improving the efficiency of personnel at the workface is a key objective for executing construction, maintenance, quality, engineering and human performance activities. Schedule and cost overruns have a significant impact on the bottom line and on future business efficiency in execution of tasks is paramount to success. Leveraging information and communications technology (ICT) in construction, maintenance and operation environments can create a mobile workforce where personnel efficiency is improved, significant gains are made on schedule and cost, and the overall quality of work is raised. This paper will discuss the impact of mobile technology specifically on workface efficiency and productivity. (author)

  19. Ballistic characteristics improving and maintenance of protective ballistic vests

    OpenAIRE

    RADONJIC VOJKAN M.; JOVANOVIC DANKO M.; ZIVANOVIC GORAN Z.; RESIMIC BRANKO V.

    2014-01-01

    The work presents research of the materials necessary for the maintenance of protective ballistic vests. In this paper is proposed a new construction design with modern materials for ballistic inserts producing. This paper also presents the results of laboratory tests of ballistic cartridges with new materials. Based on the test results, it can be concluded, the proposed technical solution for making ballistic inserts adequately meets current standards.

  20. Human factors in operational maintenance on future naval vessels

    NARCIS (Netherlands)

    Post, W.M.; Schreurs, J.C.; Rakhorst-Oudendijk, M.L.W.; Badon Ghijben, N.A.; Diggelen, J. van

    2014-01-01

    The increasing complexity of operational maintenance on naval platforms and the need to sustain this also in battle conditions are in conflict with the requirement for crew reduction. This asks for a new approach. The Netherlands MoD knows how to develop technical solutions for operational

  1. Optimisation oriented lean six sigma development for maintenance management in service sector

    OpenAIRE

    Alsubaie, Barrak Hamdan

    2016-01-01

    This thesis was submitted for the award of Doctor of Philosophy and was awarded by Brunel University London This research deals with the optimization of preventive maintenance (PM) and process improvement for maintenance management in service sector. To stay competitive and sustain long-term profitability, process improvement methodologies have become strategically important for maintenance management in recent years. These include well-known approaches such as Total Quality Management (TQ...

  2. Valves maintenance management in nuclear power plants

    International Nuclear Information System (INIS)

    Trost, J.

    2001-01-01

    The deregulation of Europe's power market will force nuclear power plant operators to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing expenditure on maintenance. Framatome ANP GmbH, in cooperation with plant operators is currently developing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. (Author)

  3. The future of artificial intelligence in nuclear plant maintenance

    International Nuclear Information System (INIS)

    Norgate, G.

    1984-01-01

    Robots with vision and force sensing capability, performing tasks under computer control, will offer new opportunities to reduce human exposure to radiation. Such machines do not yet exist and even simple maintenance tasks challenge current robot technology. Recently increased priority for research on artificial intelligence and fifth generation computer technology is likely to bring useful maintenance robots closer to reality

  4. Different genome maintenance strategies in human and tobacco cells.

    Science.gov (United States)

    Pelczar, Pawel; Kalck, Véronique; Kovalchuk, Igor

    2003-08-22

    In this work, genome maintenance strategies of organisms belonging to different kingdoms (animals versus plants) but of similar genome size were investigated using a novel, universal double-strand break (DSB) repair assay. Different plasmids linearised with KpnI, Acc65I or EcoRV yielding either 3' or 5' protruding or blunt DNA termini, respectively, were transfected into HeLa cells and Nicotiana plumbaginifolia protoplasts and assayed for the efficiency and fidelity of DSB repair. We show that the mechanism of break sealing is similar but that drastic differences are seen in the fidelity of repair: in HeLa cells, 50-55% DSBs were repaired precisely, compared to as little as 15-30% in tobacco cells. Moreover, the DSB repair in plants resulted in 30-40% longer deletions and significantly shorter insertions. Combined, these led to more than twofold larger net DNA loss in tobacco cells. Our observations point to possible differences in the strategies of DSB repair and genome maintenance in plants and animals.

  5. Remote Maintenance Design Guide for Compact Processing Units

    Energy Technology Data Exchange (ETDEWEB)

    Draper, J.V.

    2000-07-13

    Oak Ridge National Laboratory (ORNL) Robotics and Process Systems (RPSD) personnel have extensive experience working with remotely operated and maintained systems. These systems require expert knowledge in teleoperation, human factors, telerobotics, and other robotic devices so that remote equipment may be manipulated, operated, serviced, surveyed, and moved about in a hazardous environment. The RPSD staff has a wealth of experience in this area, including knowledge in the broad topics of human factors, modular electronics, modular mechanical systems, hardware design, and specialized tooling. Examples of projects that illustrate and highlight RPSD's unique experience in remote systems design and application include the following: (1) design of a remote shear and remote dissolver systems in support of U.S. Department of Energy (DOE) fuel recycling research and nuclear power missions; (2) building remotely operated mobile systems for metrology and characterizing hazardous facilities in support of remote operations within those facilities; (3) construction of modular robotic arms, including the Laboratory Telerobotic Manipulator, which was designed for the National Aeronautics and Space Administration (NASA) and the Advanced ServoManipulator, which was designed for the DOE; (4) design of remotely operated laboratories, including chemical analysis and biochemical processing laboratories; (5) construction of remote systems for environmental clean up and characterization, including underwater, buried waste, underground storage tank (UST) and decontamination and dismantlement (D&D) applications. Remote maintenance has played a significant role in fuel reprocessing because of combined chemical and radiological contamination. Furthermore, remote maintenance is expected to play a strong role in future waste remediation. The compact processing units (CPUs) being designed for use in underground waste storage tank remediation are examples of improvements in systems

  6. The Comparison of Effectiveness of Cognitive-Behavioral Group Therapy Based on Coping Skills and Methadone Maintenance Treatment in Improvement of Emotional Regulation Strategies and Relapse Prevention

    Directory of Open Access Journals (Sweden)

    Tahereh Ghorbany

    2011-05-01

    Full Text Available Purpose: This study compared the effectiveness of group cognitive-behavioral therapy based on coping skills (CBT and methadone maintenance therapy (MMT in improvement of emotional regulation strategies and prevention of relapse. Method: The method of the present study was semi-experimental research design (pre-test-post-test with witness group. For sampling 45 substance abuse people who had referred to addiction treatment centers were selected and assigned to three groups of cognitive behavior therapy, methadone maintenance treatment and witness group randomly. The participants in all three groups completed the emotional intelligence questionnaire before and after the intervention. Data were analyzed by covariance method. Results: The results showed that cognitive-behavior therapy in comparison to methadone maintenance therapy and witness group led to significant improvement of emotional regulation in substance abusers, but there was no significant difference between the methadone maintenance treatment group and control group. Also, the rate of relapse in individuals who assigned to cognitive-behavior therapy group in comparison to methadone maintenance therapy and the witness group was significantly lower, but there was no significant difference between methadone therapy and witness. Conclusion: Cognitive-behavior therapy was an effective treatment that can change the cognitive and behavioral variables related to substance abuse, such as emotional regulation strategies. Thus, results suggested that drug abuse treatment programs must target these mediator variables.

  7. Exposure control during high maintenance jobs

    International Nuclear Information System (INIS)

    Hinson, C.S.; Wigginton, J.E.

    1991-01-01

    Occupational radiation doses at US light-water-cooled reactors (LWRs) have been decreasing every year since 1983. In 1989, the LWR average dose per reactor reached its lowest point since 1973. Historically, maintenance-related activities have accounted for between 70 and 75% of the total occupational doses at US LWRs, and most of this maintenance-related dose is accrued during plant outages. This paper will focus on high dose maintenance jobs such as steam generator replacement, recirculation pipe replacement/crack repair, induction heating stress improvement, and steam generator tube plugging/sleeving and will discuss how the doses associated with these jobs have declined over the past several years through the implementation of various ALARA techniques

  8. Improvement of hydration and epidermal barrier function in human skin by a novel compound isosorbide dicaprylate.

    Science.gov (United States)

    Chaudhuri, R K; Bojanowski, K

    2017-10-01

    The study involved the synthesis of a novel derivative of caprylic acid - isosorbide dicaprylate (IDC) - and the evaluation of its potential in improving water homoeostasis and epidermal barrier function in human skin. The effect of IDC on gene expression was assayed in skin organotypic cultures by DNA microarrays. The results were then confirmed for a few key genes by quantitative PCR, immuno- and cytochemistry. Final validation of skin hydration properties was obtained by four separate clinical studies. Level of hydration was measured by corneometer either by using 2% IDC lotion alone vs placebo or in combination with 2% glycerol lotion vs 2% glycerol only. A direct comparison in skin hydration between 2% IDC and 2% glycerol lotions was also carried out. The epidermal barrier function improvement was assessed by determining changes in transepidermal water loss (TEWL) on the arms before and after treatment with 2% IDC lotion versus placebo. IDC was found to upregulate the expression of AQP3, CD44 and proteins involved in keratinocyte differentiation as well as the formation and function of stratum corneum. A direct comparison between 2% IDC versus 2% glycerol lotions revealed a three-fold advantage of IDC in providing skin hydration. Severely dry skin treated with 2% IDC in combination with 2% glycerol showed 133% improvement, whereas 35% improvement was observed with moderately dry human skin. Topical isosorbide dicaprylate favourably modulates genes involved in the maintenance of skin structure and function, resulting in superior clinical outcomes. By improving skin hydration and epidermal permeability barrier, it offers therapeutic applications in skin ageing. © 2017 Society of Cosmetic Scientists and the Société Française de Cosmétologie.

  9. Maintenance in sustainable manufacturing

    Directory of Open Access Journals (Sweden)

    Vladimir Stuchly

    2014-09-01

    Full Text Available Background: Sustainable development is about reaching a balance between economic, social, and environmental goals, as well as people's participation in the planning process in order to gain their input and support. For a company, sustainable development means adoption of such business strategy and actions that contribute to satisfying present needs of company and stakeholders, as well as simultaneous protection, maintenance and strengthening of human and environmental potential which will be needed in the future. This new approach forces manufacturing companies to change their previous management paradigms. New management paradigm should include new issues and develop innovative methods, practices and technologies striving for solving problem of shortages of resources, softening environment overload and enabling development of environment-friendly lifecycle of products. Hence, its realization requires updating existing production models as they are based on previously accepted paradigm of unlimited resources and unlimited regeneration capabilities. Maintenance plays a crucial role because of its impact on availability, reliability, quality and life cycle cost, thus it should be one of the main pillars of new business running model.  Material and methods: The following paper is a result of research on the literature and observation of practices undertaken by a company within maintenance area. Results and conclusions: The main message is that considering sustainable manufacturing requires considerable expanding range of analysis and focusing on supporting processes. Maintenance offers numerous opportunities of decreasing influence of business processes on natural environment and more efficient resources utilization. The goal of maintenance processes realizing sustainable development strategy is increased profitability of exploitation and optimization of total lifecycle cost without disturbing safety and environmental issues. 

  10. Procedure to evaluate and control efficiently the operations management of medical equipment in the maintenance unit of a health institution

    Directory of Open Access Journals (Sweden)

    Herrera-Galán Michael

    2018-01-01

    Full Text Available Maintenance management plays a very important role in the success of any company. As a consequence of this, in the year of 2013, a study was carried out in health facilities found in the South Eastern Region of Jamaica with the objective of evaluating the existing Maintenance Management Program for Medical Equipment. Among the results obtained, it showed that there is an inadequacy in the existing program whose principal deficiency is attributed to the operations management. As such, this work proposes a procedure for evaluating and controlling in an efficient manner the operations management within the Biomedical Department which forms part of the South East Regional Health Authority Maintenance Unit (SERHAMU, this latter is found on the premises of the Bustamante Hospital for Children (BHC, Jamaica. The method used to develop the procedure (GOMHO is based fundamentally on the design of: a codification system to identify control registers and to record failures associated with each equipment, a system of placing equipment into categories and further differentiating them based on the potential hazard such pose on the human body in the event of an operational failure. In addition, this procedure gives the SERHAMU at the BHC the opportunity to calculate the amount of human resources needed to carry out efficiently the preventative and corrective maintenance work being demanded on the department. During the implementation phase, the results demonstrated that from the control procedure designed there was an improvement in the planning and carrying out of maintenance work and a better system of monitoring the activities that are executed. Also, it was evidenced that there is a 61.53% of the amount of human resources needed to carry out the maintenance actions.

  11. Framework for implementation of maintenance management in distribution network service providers

    International Nuclear Information System (INIS)

    Gomez Fernandez, Juan Francisco; Crespo Marquez, Adolfo

    2009-01-01

    Distribution network service providers (DNSP) are companies dealing with network infrastructure, such as distribution of gas, water, electricity or telecommunications, and they require the development of special maintenance management (MM) capabilities in order to satisfy the needs of their customers. In this sector, maintenance management information systems are essential to ensure control, gain knowledge and improve decision making. The aim of this paper is the study of specific characteristics of maintenance in these types of companies. We will investigate existing standards and best management practices with the scope of defining a suitable ad-hoc framework for implementation of maintenance management. The conclusion of the work supports the proposition of a framework consisting on a processes framework based on a structure of systems, integrated for continuous improvement of maintenance activities. The paper offers a very practical approach to the problem, as a result of more of 10 years of professional experience within this sector, and specially focused to network maintenance.

  12. Overview of NRC's human factors regulatory research program

    International Nuclear Information System (INIS)

    Coffman, F.D. Jr.

    1989-01-01

    The human factors research program is divided into distinct and interrelated program activities: (1) Personnel Performance measurement, (2) Personnel Subsystem, (3) Human-System Interface, (4) Organization and Management, and (5) a group of Reliability Assessment activities. The purpose of the Personnel Performance Measurement activity is to improve the Agency's understanding of the factors influencing personnel performance and the effects on the safety of nuclear operations and maintenance by developing improvements to methods for collecting and managing personnel performance data. Personnel Subsystem research will broaden the understanding of such factors as staffing, qualifications, and training that influence human performance in the nuclear system and will develop the technical basis for regulatory guidance to reduce any adverse impact of these influences on nuclear safety. Research in the Human-System Interface activity will provide the technical basis for ensuring that the interface between the system and the human user supports safe operations and maintenance. Organization and Management research will result in the development of tools for evaluating organization and management issues within the nuclear industry. And finally, the Reliability Assessment group of activities includes multidisciplinary research that will integrate human and hardware considerations for evaluating reliability and risk in NRC licensing, inspection, and regulatory decisions

  13. Managing Human Performance to Improve Nuclear Facility Operation

    International Nuclear Information System (INIS)

    2013-01-01

    One of the IAEA's statutory objectives is to 'seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world.' One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish 'standards of safety for protection of health and minimization of danger to life and property'. The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. IAEA Nuclear Energy Series No. NG-G-2.1, Managing Human Resources in the Field of Nuclear Energy, was published in 2009. In that publication, four interrelated objectives of the management of human resources were identified and discussed: ensuring that nuclear industry personnel have the necessary competence for their jobs; effectively organizing work activities; anticipating human resource needs; and monitoring and continually improving performance. This publication addresses the fourth objective and, in particular, summarizes good practices in the area of managing human performance

  14. Flexibility configurations and preventive maintenance impact on job-shop manufacturing systems

    Directory of Open Access Journals (Sweden)

    Paolo Renna

    2017-03-01

    Full Text Available Manufacturing systems need to be able to work under the dynamic and uncertain production environment. Machine and routing flexibility combined with preventive maintenance actions can improve the performance of the manufacturing systems under dynamic conditions. This paper evaluates different levels of machine and routing flexibility combined with different degrees of preventive maintenance policy. The performance measures considered are throughput, work in process and throughput. The performance measures are compared with a system without any flexibility and no preventive maintenance actions. Different levels of flexibility and preventive maintenance actions are examined under a simulation environment. The simulation results highlight more important factors for the performance measures and the best combination of the factors to improve the performance.

  15. Maintenance-based prognostics of nuclear plant equipment for long-term operation

    Energy Technology Data Exchange (ETDEWEB)

    Welz, Zachary; Coble, Jamie; Upadhyaya, Belle; Hines, Wes [University of Tennessee, Knoxville (United States)

    2017-08-15

    While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

  16. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  17. Study on the Management for the Nuclear Power Plant Maintenance and Equipment Reliability

    International Nuclear Information System (INIS)

    Yoon, Kyeongseop; Lee, Sangheon; Kim, Myungjin; Lee, Unjang

    2015-01-01

    In our country, many studies on the regulatory policy of the plant maintenance have ever been performed since 1998, but the relevant regulatory requirements were not established yet. These background mentioned above request us to study on the regulation policy and maintenance plan to improve the safety, reliability and efficiency of NPP. To solve these problems, in this study, we deduct the management methodology for the improvement of NPP maintenance and equipment reliability that is essential to secure the safety and efficiency of the commercial NPP. For analysis the maintenance and equipment reliability management methodology in overseas NPP. We studied maintenance and equipment reliability of USA, Canada and Europe(France, England, German). We also studied status and application condition of Korean NPP maintenance management technical development. We deducted an effective maintenance methodology that is needed to Korean NPP, as a result of comparison on the technical trend of the maintenance management between overseas and Korean, such like following. - Regulation form ·Specific provision of regulation requirement and application of form that is clarifying application standard - Maintenance management methodology, Maintenance management program. This results of study could be applied for regulation policy, law and guideline establishment of NPP maintenance, operation, supervision and a system establishment for maintenance management, education data about maintenance for NPP employees

  18. Probabilistic analysis of free ways for maintenance; Analisis probabilista de vias libres para mantenimiento

    Energy Technology Data Exchange (ETDEWEB)

    Torres V, A.; Rivero O, J.J. [Dpto. Ingenieria Nuclear, Instituto Superior de Tecnologias y Ciencias Aplicadas, Ave. Salvador Allende y Luaces, Quinta de los Molinos, Plaza, Ciudad Habana (Cuba)]. e-mail: atorres@fctn.isctn.edu.cu

    2004-07-01

    The safety during the maintenance interventions is treated in limited manner and in general independent of the systems of management of the maintenance. This variable is affected by multiple technical or human factors many times subjective and difficult to quantifying, what limits the design of preventive plans. However, some factors constitute common points: the isolation configurations during the free ways (bank drafts in the oil industry) and the human errors associated to their violation. This characteristic allowed to develop the analysis of such situations through the methodology of fault trees that it links faults of teams and human errors cohesively. The methodology has been automated inside the MOSEG Win Ver 1.0 code and the same one can embrace from the analysis of a particular situation of free way until that of a complete strategy of maintenance from the point of view of the safety of the maintenance personal. (Author)

  19. Development of optical fiber cable's inspection technology and maintenance criteria

    International Nuclear Information System (INIS)

    Kim, Min-Su; Ju, Hee-Wan; Shim, Seon-Heum; Lee, Youn-Ki; Kim, Jin-Il; Huh, Tae-Young

    2008-01-01

    Improve the reliability and establish the systematic maintenance methods for the digital control facilities' optical fiber cable, reviewed the technical requirements and the current maintenance procedures, analyzed the optical fiber cable's characteristics through actual test like bending, tension, attenuation. Based on the results of review, test and analysis, prepared the maintenance criteria and standard maintenance guideline. Also we verified those can be applied directly to the operating nuclear power plant through the actual test at Ulchin Unit 6. The details of test and analysis are presented in this paper. Also introduce the contents of maintenance criteria and guidelines

  20. CONSIDERATIONS UPON DESIGNING MODULAR CONSTRUCTIONS FOR IMPROVING THE PRODUCTS ASSEMBLING, MAINTENANCE AND RECYCLING PROCESSES

    Directory of Open Access Journals (Sweden)

    BÂRSAN Lucian

    2015-11-01

    Full Text Available Modular constructions are frequently used in industry because of their multiple advantages. Used from the antiquity as a measuring system that ensured good proportions for the objects or buildings, the module is used in present industry as a tool for improving the product maintenance, repair, upgrading, and/or recycling. Modular constructions can be assembled and disassembled easily, facilitating the postuse actions like subassemblies reuse, or materials recovering for the recycling process. An important aspect of this paper is that designers should create the modular solution even from the conceptual design stage and build a structure of functions based on well motivated arguments and which can easily be brake out according to technological possibilities, product functioning and assembly solutions.

  1. TPX in-vessel remote maintenance tooling

    International Nuclear Information System (INIS)

    Rennich, M.J.; Silke, G.W.

    1995-01-01

    The Tokamak Physics Experiment (TPX) has used the lessons learned from successful remote maintenance and remote handling facilities to develop both a concept and philosophy for incorporation of remote design from the earliest phases of the project. Initiation of mockup testing during the conceptual design phase leads to significant improvements in the basic maintenance equipment configuration. In addition, remote handling features and capabilities have been incorporated into the design of the plasma-facing components (PFCs) as part of the total PFC design effort

  2. A human factors needs assessment and planning study

    International Nuclear Information System (INIS)

    Price, H.E.; Van Cott, H.P.

    1982-06-01

    A study was done to assess the need for human factors research, development, and regulatory action in the Atomic Energy Control Board. Further study or development in nine human factors areas is proposed. The urgency, schedule, and resources judged to be necessary for the proposed efforts are estimated. Special emphasis is placed on the need for task analysis information, for the evaluation of control room and maintenance human engineering, and for the development of an improved human error reporting system

  3. Evaluation System and Implementation Countermeasure of Automobile Green Maintenance

    Science.gov (United States)

    Zhang, Fei; Xie, Xinxin; Yan, Chaoyong

    2018-01-01

    Green maintenance research is in the beginning of our country, the work is being explored. Based on the existing research results at home and abroad, this paper learns and draws lessons from the experiences and lessons of foreign advanced countries and domestic advanced enterprises. In the face of the challenges brought by economic development and energy saving and emission reduction, this paper discusses the green maintenance theory and security system, And the research status of green maintenance content and system at home and abroad, through the deletion and selection of green maintenance index, through the AHP method to determine the green evaluation criteria, and the introduction of C equivalent evaluation system, the use of fuzzy synthesis Evaluation method to build a green maintenance evaluation model, and the actual validation, put forward the implementation of green maintenance feasibility programs and related security recommendations, vehicle maintenance enterprises to carry out green maintenance, improve business efficiency and reduce environmental management costs to provide theoretical basis. And to achieve effective reduction of environmental pollution, reduce maintenance costs of the target, a reasonable promotion of maintenance and environmental protection and sustainable development. Promote green maintenance from research to practice, from the laboratory to the maintenance of enterprises, from the pilot to the overall development and transformation.

  4. Program strategies for maintenance management, organization and planning

    International Nuclear Information System (INIS)

    Czegeny, J.I.

    2003-01-01

    In this paper we look respectively at three specific examples showing program strategies for maintenance management, organization and planning. Starting with preventive maintenance optimization, we will look at one Bruce B Predefined task on the Reactor Regulating System to illustrate reduced maintenance requirement, a maintenance management strategy. Next discussed is the organizational strategy at Darlington to have an engineering program meet the jurisdictional requirements for maintaining certification for TSSA registered pressure vessels. The last look-see will show the earned value of the planning for the first Pickering A unit to be returned to service. Finally all the above is tied together in a compare and contrast of what works and what could be improved upon. (author)

  5. Forecasts of the Maintenance Activity

    Directory of Open Access Journals (Sweden)

    Marius Romocea

    2017-11-01

    Full Text Available Enhancing the machines’ technical and technological performance through constructive improvements that allow for the automation of orders, contributes to the increasing of the production capacity of the system and for maintaining an optimal level of product costs. In order to achieve these goals, it is necessary to organize the maintenance work well, in order to quickly diagnose the malfunctions and to shorten the repair time. Given the scale of the phenomena, this paper seeks to answer two questions, namely: how will be the maintenance in future and also how to prepare this activity.

  6. Integrated maintenance management model in the printing industry

    Directory of Open Access Journals (Sweden)

    Csaba Horváth

    2010-09-01

    Full Text Available Rapid technological and economic changes are setting radically new task for maintenance divisions of printingworks. In this dissertation the author provides a summary on the possible approaches for the adoption to the newrequirements. He formulates his situation analysis based on an exhaustive questionnaire survey, and points out thecurrents of changes and challenges caused by the expected developments in the maintenance field of the printingindustry.Based on the possible answers on these challenges, the Author has compiled a - yet missing - maintenance managementmodel that encompasses the maintenance specialties of the industry, as well as the professional heritage andthe latest scientific accomplishments in the discipline of maintenance.The model is based on the widely accepted quality focused maintenance approach, that is supplemented by theAuthor with four new aspects - 1 reliability-focused culture, 2 quality management system, 3 employment ofexternal service provides, 4 maintenance characteristics specific to printing machinery - determining their effectsand integrating them into one single system.In order to construct the model, the Author develops specific solutions that can be seen as own scientific achievementson the specification of maintenance characteristics of printing machinery; on the efficiency improving applicationsof quality management systems, modern knowledge management and reliability focused corporate culture;and on the implementation of a maintenance information system.

  7. 49 CFR 260.39 - Maintenance standards.

    Science.gov (United States)

    2010-10-01

    ... REHABILITATION AND IMPROVEMENT FINANCING PROGRAM Standards for Maintenance of Facilities Involved in the Project... the project. (b) When the proceeds of a direct loan or an obligation guaranteed by the Administrator...

  8. Local panels and maintainability human factors assessment for AP1000 nuclear power plant

    International Nuclear Information System (INIS)

    Li, Zhonghai; Reed, Julie I.

    2011-01-01

    A document entitled 'AP1000 Local Panels and Maintainability Human Factors Design Guidelines' was produced to aid the designers to specifically include human factors (HF) considerations in the design, operation, and maintenance of local control stations and plant equipment. To ensure that the applicable HF design guidelines are appropriately applied to the design of local panels and maintenance activities, and identify any HF improvement opportunities that can readily be implemented at the design stage, a HF assessment of maintenance activities and local plant operations is underway. This assessment gives priority to local control stations and equipment which have been identified as having a potential impact on safety. This includes risk-significant systems, structures and components (SSCs) identified through the probabilistic risk assessment (PRA), and local operator actions as required by the Emergency Operating Procedures (EOPs). Local actions, maintenance activities and associated operator interfaces are reviewed against the relevant HF guidelines. The results of the assessment include a description of the component, associated local actions and/or required maintenance activities, good design features and/or potential issues, and recommendations for change or improvement. These results are communicated to responsible design engineers who evaluate the impact to plant design and implement design changes, if deemed necessary. (author)

  9. Optimisation of maintenance and inspection work in nuclear power plants

    International Nuclear Information System (INIS)

    Meyer, V.

    1996-01-01

    The long-term planning and comparative evaluation of inspection and maintenance intervals as well as results of electric components and machinery have to be intensified in order to shorten maintenance shut-down periods, e.g. of the Grohnde reactor station, thus improving the availability of the plant and the specific electricity generation cost. Economically efficient maintenance has to be based on an efficient organisational structure. Outsourcing of less plant-specific work and tasks offers the possibility for in-house personnel to concentrate on their core competences. All the measures discussed contribute to improving the economic efficiency of the nuclear power plants. (orig./DG) [de

  10. A study on mobile PC display design in NPP maintenance considering the level of expertise

    International Nuclear Information System (INIS)

    Kim, In

    2010-02-01

    Recently, the importance of effective maintenance in nuclear power plants (NPPs) has been emphasized and research into effective maintenance by adopting mobile maintenance aids (MMAs) have been attempted. MMAs are currently used during operation and maintenance in NPPs, but no method that considers the limitations of mobile devices has been proposed. For improved and effective use, an MMA display design method based on abstraction hierarchy (AH) is proposed and its design considerations are discussed in this study. Six levels of abstraction hierarchy are proposed in this paper to classify the maintenance information. By classifying and organizing maintenance information using AH, maintenance information can be used effectively by users either high or low levels of expertise. When information classification has been finished, the information requirements and relationships for MMA design is extracted from the analysis of the AH result. Representative human-machine interface (HMI) guidelines issued by the US NRC, which are generally used in NPPs, are applied. With the considerations of MMA design analysis and practical guidelines, AH-based MMA is designed for maintenance tasks. An experiment is conducted using the AH-based MMA in order to estimate the effectiveness of the proposed method for maintenance tasks and to identify design considerations to enhance the proposed MMAs. The result indicated that an AH-based manual was more effective than a conventional manual in terms of task completion time and number of errors. The workload for the AH-based manual was estimated to be less than the conventional manual for low levels of expertise. However, a conventional manual was more comprehensive than the proposed manual and the steps contained in the maintenance manual were easier to remember. As the level of expertise increases, subjects tended to follow more abstract information while the number of navigations decreased. It is believed that when mobile devices become

  11. Integrating Safety in the Aviation System: Interdepartmental Training for Pilots and Maintenance Technicians

    Science.gov (United States)

    Mattson, Marifran; Petrin, Donald A.; Young, John P.

    2001-01-01

    The study of human factors has had a decisive impact on the aviation industry. However, the entire aviation system often is not considered in researching, training, and evaluating human factors issues especially with regard to safety. In both conceptual and practical terms, we argue for the proactive management of human error from both an individual and organizational systems perspective. The results of a multidisciplinary research project incorporating survey data from professional pilots and maintenance technicians and an exploratory study integrating students from relevant disciplines are reported. Survey findings suggest that latent safety errors may occur during the maintenance discrepancy reporting process because pilots and maintenance technicians do not effectively interact with one another. The importance of interdepartmental or cross-disciplinary training for decreasing these errors and increasing safety is discussed as a primary implication.

  12. Fire protection maintenance at Browns Ferry Nuclear Plant

    International Nuclear Information System (INIS)

    Kern, J.R.

    1989-01-01

    This paper describes two approaches to staffing and organizing a fire protection maintenance group. Both have been used at Browns Ferry Nuclear Plant. One takes traditional craft functions and relocates them from the plant maintenance department to the fire protection section. The other expands the role to include response to fire, medical, and hazardous material emergencies. Both approaches remove the fire protection supervisor from a purely staff role, and involve him/her in direct-line management functions. This results in improved technical direction to the craftsmen, improved quality of the work performed, and improved craft morale. It also assures the fire protection supervisor of much more detailed knowledge of the overall status of the fire protection systems

  13. Human Reliability Analysis. Applicability of the HRA-concept in maintenance shutdown; Analys av maensklig tillfoerlitlighet. HRA-begreppets tillaempbarhet vid revisionsavstaellning

    Energy Technology Data Exchange (ETDEWEB)

    Obenius, Aino (MTO Psykologi AB, Stockholm (SE))

    2007-08-15

    Probabilistic Safety Analysis (PSA) is performed for Swedish nuclear power plants in order to make predictions and improvements of system safety. The analysis of the Three Mile Island and Chernobyl accidents contributed to broaden the approach to nuclear power plant safety. A system perspective focusing on the interaction between aspects of Man, Technology and Organization (MTO) emerged in addition to the development of Human Factors knowledge. To take the human influence on the technical system into consideration when performing PSAs, a Human Reliability Analysis (HRA) is performed. PSA is performed for different stages and plant operating states, and the current state of Swedish analyses is Low power and Shutdown (LPSD), also called Shutdown PSA (SPSA). The purpose of this master's thesis is to describe methods and basic models used when analysing human reliability for the LPSD state. The following questions are at issue: 1. How can the LPSD state be characterised and defined? 2. What is important to take into consideration when performing a LPSD HRA? 3. How can human behaviour be modelled for a LPSD risk analysis? 4. According to available empirical material, how are the questions above treated in performed analysis of human operation during LPSD? 5. How does the result of the questions above affect the way methods for analysis of LPSD could and/or should be developed? The procedure of this project has mainly consisted of literature studies of available theory for modelling of human behaviour and risk analysis of the LPSD state. This study regards analysis of planned outages when maintenance, fuel change, tests and inspections are performed. The outage period is characterised by planned maintenance activities performed in rotating 3-shifts, around the clock, as well as many of the persons performing work tasks on the plant being external contractors. The working conditions are characterised by stress due to heat, radiation and physically demanding or

  14. Using ELECTRE TRI to support maintenance of water distribution networks

    Directory of Open Access Journals (Sweden)

    Flavio Trojan

    2012-08-01

    Full Text Available Problems encountered in the context of the maintenance management of water supply are evidenced by the lack of decision support models which gives a manager overview of the system. This paper, therefore, develops a model that uses, in its framework, the multicriteria outranking method ELECTRE TRI. The objective is to sort the areas of water flow measurement of a water distribution network, by priority of maintenance, with data collected from an automated system of abnormalities detection. This sorting is designed to support maintenance decisions in terms of the measure more appropriate to be applied per region. To illustrate the proposed model, an application was performed in a city with 100 thousand water connections. With this model it becomes possible to improve the allocation of maintenance measures for regions and mainly to improve the operation of the distribution network.

  15. Supporting industrial equipment development through a set of design-for-maintenance guidelines

    NARCIS (Netherlands)

    Mulder, W.; Basten, Robertus Johannes Ida; Jauregui Becker, Juan Manuel; Blok, Jeroen; Hoekstra, Sipke; Kokkeler, Frans; Marjanovic, Dorian; Storga, Mario; Pavkovic, Neven; Bojcetic, Nenad

    2014-01-01

    This paper presents a leaflet with design-for-maintenance guidelines. It aims at supporting developers of industrial equipment in their design-for-maintenance practices. The use of this leaflet should lead to increased attention for design-for-maintenance aspects and to improve idea generation. The

  16. Maintenance rule: a system to guarantee maintenance effectiveness

    International Nuclear Information System (INIS)

    Torralbo, J.R.

    1995-01-01

    In the last few years, maintenance activities in nuclear plants have been given prime attention in view of their repercussion on the performance of such plants. One of the results of that attention is a new rule published in the U.S. known as M aintenance Rule . The paper describes the philosophy and main guidelines of the new regulation, and presents the procedure brought into action by the nuclear industry in Spain so to make their application contribute to a real improvement of safety and performance in nuclear plants. (Author)

  17. Maintenance Management in Network Utilities Framework and Practical Implementation

    CERN Document Server

    Gómez Fernández, Juan F

    2012-01-01

    In order to satisfy the needs of their customers, network utilities require specially developed maintenance management capabilities. Maintenance Management information systems are essential to ensure control, gain knowledge and improve-decision making in companies dealing with network infrastructure, such as distribution of gas, water, electricity and telecommunications. Maintenance Management in Network Utilities studies specified characteristics of maintenance management in this sector to offer a practical approach to defining and implementing  the best management practices and suitable frameworks.   Divided into three major sections, Maintenance Management in Network Utilities defines a series of stages which can be followed to manage maintenance frameworks properly. Different case studies provide detailed descriptions which illustrate the experience in real company situations. An introduction to the concepts is followed by main sections including: • A Literature Review: covering the basic concepts an...

  18. Analysis of trends in aviation maintenance risk: An empirical approach

    International Nuclear Information System (INIS)

    Marais, Karen B.; Robichaud, Matthew R.

    2012-01-01

    Safety is paramount in the airline industry. A significant amount of effort has been devoted to reducing mechanical failures and pilot errors. Recently, more attention has been devoted to the contribution of maintenance to accidents and incidents. This study investigates and quantifies the contribution of maintenance, both in terms of frequency and severity, to passenger airline risk by analyzing three different sources of data from 1999 to 2008: 769 NTSB accident reports, 3242 FAA incident reports, and 7478 FAA records of fines and other legal actions taken against airlines and associated organizations. We analyze several safety related metrics and develop an aviation maintenance risk scorecard that collects these metrics to synthesize a comprehensive track record of maintenance contribution to airline accidents and incidents. We found for example that maintenance-related accidents are approximately 6.5 times more likely to be fatal than accidents in general, and that when fatalities do occur, maintenance accidents result in approximately 3.6 times more fatalities on average. Our analysis of accident trends indicates that this contribution to accident risk has remained fairly constant over the past decade. Our analysis of incidents and FAA fines and legal actions also revealed similar trends. We found that at least 10% of incidents involving mechanical failures such as ruptured hydraulic lines can be attributed to maintenance, suggesting that there may be issues surrounding both the design of and compliance with maintenance plans. Similarly 36% of FAA fines and legal actions involve inadequate maintenance, with recent years showing a decline to about 20%, which may be a reflection of improved maintenance practices. Our results can aid industry and government in focusing resources to continue improving aviation safety.

  19. Human mortality improvement in evolutionary context

    DEFF Research Database (Denmark)

    Burger, Oskar; Baudisch, Annette; Vaupel, James W

    2012-01-01

    Life expectancy is increasing in most countries and has exceeded 80 in several, as low-mortality nations continue to make progress in averting deaths. The health and economic implications of mortality reduction have been given substantial attention, but the observed malleability of human mortality...... about 4 of the roughly 8,000 human generations that have ever lived. Moreover, mortality improvement in humans is on par with or greater than the reductions in mortality in other species achieved by laboratory selection experiments and endocrine pathway mutations. This observed plasticity in age...

  20. Value centric approaches to the design, operations and maintenance of wind turbines

    Science.gov (United States)

    Khadabadi, Madhur Aravind

    Wind turbine maintenance is emerging as an unexpectedly high component of turbine operating cost, and there is an increasing interest in managing this cost. This thesis presents an alternative view of maintenance as a value-driver, and develops an optimization algorithm to evaluate the value delivered by different maintenance techniques. I view maintenance as an operation that moves the turbine to an improved state in which it can generate more power and, thus, earn more revenue. To implement this approach, I model the stochastic deterioration of the turbine in two dimensions: the deterioration rate, and the extent of deterioration, and then use maintenance to improve the state of the turbine. The value of the turbine is the difference between the revenue from to the power generation and the costs incurred in operation and maintenance. With a focus on blade deterioration, I evaluate the value delivered by implementing two different maintenance schemes, predictive maintenance and scheduled maintenance. An example of predictive maintenance technique is the use of Condition Monitoring Systems to precisely detect deterioration. I model Condition Monitoring System (CMS) of different degrees of fidelity, where a higher fidelity CMS would allow the blade state to be determined with a higher precision. The same model is then applied for the scheduled maintenance technique. The improved state information obtained from these techniques is then used to derive an optimal maintenance strategy. The difference between the value of the turbine with and without the inspection type can be interpreted as the value of the inspection. The results indicate that a higher fidelity (and more expensive) inspection method does not necessarily yield the highest value, and, that there is an optimal level of fidelity that results in maximum value. The results also aim to inform the operator of the impact of regional parameters such as wind speed, variance and maintenance costs to the optimal

  1. Architecture and Key Techniques of Augmented Reality Maintenance Guiding System for Civil Aircrafts

    Science.gov (United States)

    hong, Zhou; Wenhua, Lu

    2017-01-01

    Augmented reality technology is introduced into the maintenance related field for strengthened information in real-world scenarios through integration of virtual assistant maintenance information with real-world scenarios. This can lower the difficulty of maintenance, reduce maintenance errors, and improve the maintenance efficiency and quality of civil aviation crews. Architecture of augmented reality virtual maintenance guiding system is proposed on the basis of introducing the definition of augmented reality and analyzing the characteristics of augmented reality virtual maintenance. Key techniques involved, such as standardization and organization of maintenance data, 3D registration, modeling of maintenance guidance information and virtual maintenance man-machine interaction, are elaborated emphatically, and solutions are given.

  2. To select the best tool for generating 3D maintenance data and to set the detailed process for obtaining the 3D maintenance data

    Science.gov (United States)

    Prashanth, B. N.; Roy, Kingshuk

    2017-07-01

    Three Dimensional (3D) maintenance data provides a link between design and technical documentation creating interactive 3D graphical training and maintenance material. It becomes difficult for an operator to always go through huge paper manuals or come running to the computer for doing maintenance of a machine which makes the maintenance work fatigue. Above being the case, a 3D animation makes maintenance work very simple since, there is no language barrier. The research deals with the generation of 3D maintenance data of any given machine. The best tool for obtaining the 3D maintenance is selected and the tool is analyzed. Using the same tool, a detailed process for extracting the 3D maintenance data for any machine is set. This project aims at selecting the best tool for obtaining 3D maintenance data and to select the detailed process for obtaining 3D maintenance data. 3D maintenance reduces use of big volumes of manuals which creates human errors and makes the work of an operator fatiguing. Hence 3-D maintenance would help in training and maintenance and would increase productivity. 3Dvia when compared with Cortona 3D and Deep Exploration proves to be better than them. 3Dvia is good in data translation and it has the best renderings compared to the other two 3D maintenance software. 3Dvia is very user friendly and it has various options for creating 3D animations. Its Interactive Electronic Technical Publication (IETP) integration is also better than the other two software. Hence 3Dvia proves to be the best software for obtaining 3D maintenance data of any machine.

  3. Animal-Assisted Therapy for Improving Human Health

    Directory of Open Access Journals (Sweden)

    Sibel Cevizci

    2009-06-01

    Full Text Available ABSTRACT Animal Assisted Therapy (AAT or Pet Therapy is an adjunctive therapy by taking advantage of human and animal interaction, activate the physiological and psychological mechanisms, initiate positive changes improving health in metabolism. In recent years, this interaction are in use to treat psychological and psychiatric disorders such as stress, depression, loneliness, pervasive developmental disorders affect negatively to human health. Furthermore, AAT has been increasingly used to improve quality of life, hypertension, cardiovascular diseases, chronic illnesses such as cancer and AIDS. The aim of this paper is to identify AAT by reviewing human and animal interaction, evaluate how AAT has a scientific background from past to now. Also, we aim to give some information about the risks, institutional applications, some factors referring AAT’s mechanism of action and chronic diseases, psychological and physical improvements provided with animal assisted therapies. The therapy results will be evaluated more advisable providing AAT is being applied with public health specialist, veterinarian, physician, psychologist, psychiatrist and veterinary public health experts who are monitor applications. Especially, the psychosomatic effects result from physical, emotional and play mechanism of action of HDT can be used for improving quality of life in individuals with chronic diseases. In Turkey, there is no any investigation which have been performed in this scientific field. It is quitely important to evaluate the benefits of this therapy accurately and to select various methods proper to diseases. Consequently, it is obvious that AAT will be considered by the healthcare services as a supportive therapy process for improving human health in Turkey and needs further studies. [TAF Prev Med Bull 2009; 8(3.000: 263-272

  4. 14 CFR 129.113 - Fuel tank system maintenance program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel tank system maintenance program. 129... Continued Airworthiness and Safety Improvements § 129.113 Fuel tank system maintenance program. (a) Except... on which an auxiliary fuel tank is installed under a field approval, before June 16, 2008, the...

  5. Evaluation of implementation an Integrated Safety and Preventive Maintenance System for Improving of Safety Indexes

    Directory of Open Access Journals (Sweden)

    I mohammadfam

    2014-03-01

    Full Text Available Accident analysis shows that one of the main reasons for accidents is non-integration of maintenance units with safety. Merging these two processes through an integrated system can reduce and or eliminate accidents, diseases, and environmental pollution. These issues lead to improvement in organizational performance, as well. The aim of this study is to design and establish an integrated system for obtaining the aforementioned goal. Integration was carried out at Nirou Moharreke Machine Tools Company via Structured System Analysis & Design Method (SSADM. In order to measure the effectiveness of the system, selected indexes were compared using statistical methods prior and after system establishment. Results show that the accident severity index reduced from 135.46 in 2010, to 43.85 in 2012. Moreover, system effectiveness improved equipment reliability and availability (e.g. reliability of the Pfeiffer Milling machine (P (t>50 increased from 0.89 in 2010, to 0.9 in 2012. This system by forecasting various failures, and planning and designing the required operations for preventing occurrence of these failures, plays an important role in improving safety conditions of equipment, and increasing organizational performance, and is capable of presenting an excellent accident prevention program.

  6. Reducing maintenance costs

    International Nuclear Information System (INIS)

    Zaiss, W.; Reuschle, K.; Baier, B.

    2002-01-01

    The increasingly more expensive maintenance measures, cuts in the cost budget, and the loss of know-how on the part of vendors all require a change of policy with respect to maintenance concepts of the part of operators. This also applies to the existing valve concepts, the drives included. Under these aspects, the current drive, which is self-actuated and actuated by outside media, for a parallel-plate valve of a nomial width of 700 was reconsidered. The effort served to reduce maintenance costs and, at the same time, simplify the drive concept as well as cut back on the number of in-service inspections. Moreover, the number of active components were to be minimized and installation conditions in the plant were to be improved. When the boundary conditions to be observed with respect to process technology had been laid down, the competent technical department developed a concept of modification of the drive. A major constituent part was the demonstration of the functioning capability of the new drive under accident conditions. It was achieved mainly by an analytical approach. In the resultant drive concept, the same control valves are employed to actuate a driving cylinder by means of self-actuation or by an outside medium as a function of pressure. (orig.) [de

  7. Study on sociological approach to resolve maintenance related social problems

    International Nuclear Information System (INIS)

    Aoki, Takayuki

    2007-01-01

    This study proposes a sociological approach to resolve maintenance related social problems. As a result of consideration, the followings were found. (1) In general, solutions to some kinds of questions can be deduced from basic laws using some theories or methodologies in the field of the natural science or engineering. The approach to resolve maintenance related social problems is similar to the approach in the natural science or engineering. (2) The points of view based on fundamental human rights, market principles and community principles, and so on, are very important in resolving maintenance related social problems and can be placed as theories or tools for resolution. (3) If such theories or tools for resolving maintenance related social problems as described above are systematically prepared, it is estimated that it becomes very much easier to resolve maintenance related social problems. (author)

  8. The role of NF-κB signaling in the maintenance of pluripotency of human induced pluripotent stem cells.

    Directory of Open Access Journals (Sweden)

    Osamu Takase

    Full Text Available NF-κB signaling plays an essential role in maintaining the undifferentiated state of embryonic stem (ES cells. However, opposing roles of NF-κB have been reported in mouse and human ES cells, and the role of NF-κB in human induced pluripotent stem (iPS cells has not yet been clarified. Here, we report the role of NF-κB signaling in maintaining the undifferentiated state of human iPS cells. Compared with differentiated cells, undifferentiated human iPS cells showed an augmentation of NF-κB activity. During differentiation induced by the removal of feeder cells and FGF2, we observed a reduction in NF-κB activity, the expression of the undifferentiation markers Oct3/4 and Nanog, and the up-regulation of the differentiated markers WT-1 and Pax-2. The specific knockdown of NF-κB signaling using p65 siRNA also reduced the expression of Oct3/4 and Nanog and up-regulated WT-1 and Pax-2 but did not change the ES-like colony formation. Our results show that the augmentation of NF-κB signaling maintains the undifferentiated state of human iPS and suggest the importance of this signaling pathway in maintenance of human iPS cells.

  9. Human-Technology Centric In Cyber Security Maintenance For Digital Transformation Era

    Science.gov (United States)

    Ali, Firkhan Ali Bin Hamid; Zalisham Jali, Mohd, Dr

    2018-05-01

    The development of the digital transformation in the organizations has become more expanding in these present and future years. This is because of the active demand to use the ICT services among all the organizations whether in the government agencies or private sectors. While digital transformation has led manufacturers to incorporate sensors and software analytics into their offerings, the same innovation has also brought pressure to offer clients more accommodating appliance deployment options. So, their needs a well plan to implement the cyber infrastructures and equipment. The cyber security play important role to ensure that the ICT components or infrastructures execute well along the organization’s business successful. This paper will present a study of security management models to guideline the security maintenance on existing cyber infrastructures. In order to perform security model for the currently existing cyber infrastructures, combination of the some security workforces and security process of extracting the security maintenance in cyber infrastructures. In the assessment, the focused on the cyber security maintenance within security models in cyber infrastructures and presented a way for the theoretical and practical analysis based on the selected security management models. Then, the proposed model does evaluation for the analysis which can be used to obtain insights into the configuration and to specify desired and undesired configurations. The implemented cyber security maintenance within security management model in a prototype and evaluated it for practical and theoretical scenarios. Furthermore, a framework model is presented which allows the evaluation of configuration changes in the agile and dynamic cyber infrastructure environments with regard to properties like vulnerabilities or expected availability. In case of a security perspective, this evaluation can be used to monitor the security levels of the configuration over its lifetime and

  10. Cross-species epigenetics identifies a critical role for VAV1 in SHH subgroup medulloblastoma maintenance.

    Science.gov (United States)

    Lindsey, J C; Kawauchi, D; Schwalbe, E C; Solecki, D J; Selby, M P; McKinnon, P J; Olson, J M; Hayden, J T; Grundy, R G; Ellison, D W; Williamson, D; Bailey, S; Roussel, M F; Clifford, S C

    2015-09-03

    The identification of key tumorigenic events in Sonic Hedgehog (SHH) subgroup medulloblastomas (MBSHH) will be essential for the development of individualized therapies and improved outcomes. However, beyond confirmation of characteristic SHH pathway mutations, recent genome-wide sequencing studies have not revealed commonly mutated genes with widespread relevance as potential therapeutic targets. We therefore examined any role for epigenetic DNA methylation events in MBSHH using a cross-species approach to candidate identification, prioritization and validation. MBSHH-associated DNA methylation events were first identified in 216 subgrouped human medulloblastomas (50 MBSHH, 28 Wnt/Wingless, 44 Group 3 and 94 Group 4) and their conservation then assessed in tumors arising from four independent murine models of Shh medulloblastoma, alongside any role in tumorigenesis using functional assessments in mouse and human models. This strategy identified widespread regional CpG hypo-methylation of VAV1, leading to its elevated expression, as a conserved aberrant epigenetic event, which characterizes the majority of MBSHH tumors in both species, and is associated with a poor outcome in MBSHH patients. Moreover, direct modulation of VAV1 in mouse and human models revealed a critical role in tumor maintenance, and its abrogation markedly reduced medulloblastoma growth. Further, Vav1 activity regulated granule neuron precursor germinal zone exit and migration initiation in an ex vivo model of early postnatal cerebellar development. These findings establish VAV1 as a critical epigenetically regulated oncogene with a key role in MBSHH maintenance, and highlight its potential as a validated therapeutic target and prognostic biomarker for the improved therapy of medulloblastoma.

  11. Ageing Management Based Maintenance at ETRR-II

    Energy Technology Data Exchange (ETDEWEB)

    Kamoon, A.; Ali, A., E-mail: akamoun2004@yahoo.com [Inshas Nuclear Research Centre, Egyptian Atomic Energy Authority (EAEA), Cairo (Egypt)

    2014-08-15

    The second research reactor of Egypt, ETRR-II, is an open pool type multi-purpose reactor of 22 MW that has been in operation since 1998. The main purposes of ETRR-II are the production of radioisotopes, personnel training, research and development. Ageing management of ETRR-II is based on the maintenance programme. This programme was planned to have a proactive maintenance strategy that mainly depends on adequate preventive and predictive maintenance. Screening of SSCs is based on safety classes, needs and quality levels. The operation condition and maintenance history are the basis to assess the level of degradation. The ultimate aim of the maintenance team is to perform adequate maintenance work only when it is really necessary. The objectives of the ageing management based maintenance are to maintain and improve equipment availability, confirm compliance with operational limits and conditions, and detect and correct any abnormal condition that might affect reactor safety. The programme also helps to detect trends in ageing so that a plan for mitigating ageing effects can be prepared and implemented. Reactor service conditions are monitored through many parameters and conditions such as conductivity and pH of coolant water, water radiochemical analysis, thermal and hydraulic parameters, a leak detection system, corrosion rate of piping, vibration level of rotating equipment and control rod drop time.

  12. Maintenance and improvement of dairy feed quality by radiation for distribution system

    International Nuclear Information System (INIS)

    Kobayashi, Ryoei; Kawamoto, Hidenori; Uegaki, Ryuichi; Tanaka, Osamu; Ando, Sada; Akiyama, Noriaki; Yamada, Akio

    1997-01-01

    With an aim to improve the quality of crude feed and its maintenance, γ-ray radiation was carried out during the steps of preparation and storage of feed and the effects on the fermentation of silage crude feed and mixed feed were investigated. Of the γ-ray radiation significant effects on general constituents in the silage were not observed immediately after the radiation, but it was clear that the contents of fibrous components were apt to increase one month later. The ratio, VBN/TN in the silage decreased with the elevation of radiation dose. Further it was found that radiation at 16 Gy or more is needed to prevent butyric acid fermentation in the silage and aerobic deterioration. In addition, the amount of peroxide lipids was not increased by the γ-radiation, suggesting that no adverse effects on the quality of the feed in silage might be caused by radiation. Thus, it was concluded that γ-radiation in appropriate conditions has favorable influence on silage fermentation. (M.N.)

  13. On condition based maintenance policy

    Directory of Open Access Journals (Sweden)

    Jong-Ho Shin

    2015-04-01

    Full Text Available In the case of a high-valuable asset, the Operation and Maintenance (O&M phase requires heavy charges and more efforts than the installation (construction phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs, we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.

  14. Budaya Keselamatan di Bengkel Perawatan Pesawat Udara pada Garuda Maintenance Facility (GMF AEROASIA)

    OpenAIRE

    Minda Mora

    2011-01-01

    Safety is the most important thing in aviation. Safety level has to improved in highest performance. One way to improve safety is to implement safety culture in organization. In case of aviation safety, safety is affected by many factors. Aircraft maintenance is of the factor. The goal of his research is to asess the aviation safety culture in maintenance facilities, case study: Garuda Maintenance Facilities (GMF) using Safety Culture Indicator Scale Measurement System (SCISMS). The Safety Cu...

  15. Maintenance viewpoint of a successful reactor program

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Grygiel, M.L.

    1984-05-01

    As the Operating and Support staffs of the FFTF organization have gained experience, the plant reliability and capacity factors have shown a steadily improving trend. The plant capacity factor for Cycle 4 was 99.5%. It is the purpose of this report to describe the evolution of the maintenance organization at the FFTF site from a general support organization to a technically proficient organization playing a major role in planning and performance of plant maintenance evolutions

  16. Management of remanent lifetime. Short-term benefits of the maintenance evaluation and improvement programme; Gestion de la vida remanente de instalaciones industriales. Extension de vida

    Energy Technology Data Exchange (ETDEWEB)

    Sainero Garcia, J [Empresarios Agrupados, Madrid (Spain)

    1993-12-15

    Remanent Lifetime Management, which is scientifically based on knowing the degradatory phenomena associated with aging, today allows us to optimize plant life through a long-term maintenance strategy combining preventive maintenance and condition monitoring programmes. Within a project for Remanent Lifetime Management (RLM), the determination of methods of control and mitigation of degradations due to aging depends on the programme of Maintenance Evaluation and Improvement (MEI). This programme, underpinned by the analysis of degradatory phenomena to which plant components are subjected, evaluates current maintenance practices and defines the complementary actions which would facilitate establishment of a long-term strategy to control aging. Together with this main objective of the RLM project, the MEI programme achieves short-term benefits since, right from the beginning, it offers solutions to mitigate and guard against degradations in crucial plant components, and generally sets out a programme to control aging. The MEI programme further serves as a tool to reach the final objectives of the new 10CFR50.65 rule, 'Requirements for Maintenance Programs for NPPs'. The MEI always offers the option should the Utility Owner decide to extend plant life. (author)

  17. Costs of performance based maintenance for local roads: Case study Albania

    Science.gov (United States)

    Jokanović, Igor; Grujić, Bojana; Zeljić, Dragana; Grujić, Žarko; Svilar, Mila

    2017-12-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inadequate local roads maintenance in Albania is proposed to be solved by implementing performance based maintenance approach for which the costing exercise is presented within the paper.

  18. Preventive and corrective maintenance for MINT EPS 3000 electron beam machine

    International Nuclear Information System (INIS)

    Siti Aiasah Hashim; Shaari Jahar

    2005-01-01

    Preventive and corrective maintenance of a high energy electron is to ensure that the machine would not fail during operation. MINT's EPS 3000 electron beam machine has been in operation for almost 12 years. Throughout those years, events relating to scheduled overhauls and unscheduled corrective maintenance had provided invaluable experience in the form of informal maintenance training to the operators. With the implementation of ISO 9001:2000 Quality Management System at the facility, the preventive and corrective maintenance program is becoming more structured and orderly. Collected maintenance data shall be used to initiate continual improvement activities in the facility.This paper describes MINT-ALURTRON's 12 years experience in providing maintenance work for the EPS 3000. (Author)

  19. Knowledge representation for integrated plant operation and maintenance

    DEFF Research Database (Denmark)

    Lind, Morten

    2010-01-01

    Integrated operation and maintenance of process plants has many advantages. One advantage is the improved economy obtained by reducing the number of plant shutdowns. Another is to increase reliability of operation by monitoring of risk levels during on-line maintenance. Integrated plant operation...... and maintenance require knowledge bases which can capture the interactions between the two plant activities. As an example, taking out a component or a subsystem for maintenance during operation will require a knowledge base representing the interactions between plant structure, functions, operating states...... and goals and incorporate knowledge about redundancy and reliability data. Multilevel Flow Modeling can be used build knowledge bases representing plant goals and functions and has been applied for fault diagnosis and supervisory control but currently it does not take into account structural information...

  20. Annual report of the maintenance division for 1965

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-12-01

    The personnel of the Division is organized in groups, each responsible for a number of tasks related to maintenance of reactor mechanical structures, electric equipment, electronic equipment. According to the action plan for 1965 the division for RA reactor maintenance the main activities were: planned maintenance of the reactor components, planned repair of the main components, indispensable repairs during reactor operation, repair during planned shutdown periods and tasks related to improvement of operation components and systems. Quite a significant number of failures was related to electronic equipment resulting from failures of thermometers in the heavy water system due to vibrations of the pumps. A number of spare parts and tools were produced needed for maintenance of reactor components, as well as instruments for control and calibration of reactor measuring devices [sr

  1. Routine maintenance: safety term based work selection; Selecao de trabalho baseado no prazo seguro

    Energy Technology Data Exchange (ETDEWEB)

    Camargo, Albair de; Filho, Antnio S.; Brendler, Fabiano E.; Adamatti, Gilberto A.; Naruto, Itiro; Araujo, Luiz C.F.; Puerari, Roberto [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    This work has objective to present the experience of improvement of routine maintenance system in some refineries of the PETROBRAS system, with the purpose to increase the efficiency in the Industrial Maintenance Management (cost), Utilization and HSE (Health, Safety and Environment), key of success of a petroleum company. The new system is based on the implantation of the culture of work selection in the safe period, through elaboration of new maintenance procedure, with emphasis in decisions shared between Operation and Maintenance Team, resulting in reduction of emergencies, making possible contract of services of maintenance for packages and improved allocation of resources. This work treat about improvement of the system in use, in view of that it has already taken in consideration the consequence of fail in the maintenance with participation of the operators. Besides of these challenge, this modification was made without causing riots in the process of implantation of SAP. As main result, financial profits had got better of resources with increase of safety, considering that they are analyzed in a way it that systematized potential risks. (author)

  2. Optimisation of distributed maintenance: Modelling and application to the multi-factory production

    Energy Technology Data Exchange (ETDEWEB)

    Simeu-Abazi, Zineb, E-mail: Zineb.Simeu-Abazi@g-scop.inpg.fr [Laboratory G-SCOP, 46 Avenue Felix Viallet, 38031 Grenoble Cedex 1 (France); Ahmad, Alali Alhouaij [Laboratory G-SCOP, 46 Avenue Felix Viallet, 38031 Grenoble Cedex 1 (France)

    2011-11-15

    This paper concerns the modelling and the cost evaluation of maintenance activities in a distributed context. In this work we study the particular case where the maintenance activities are executed by two workshops: a central maintenance workshop (CMW) and a mobile maintenance workshop (MMW). The CMW concerns the repairing process for the corrective maintenance and the MMW executes all preventive maintenance in several factories according to a defined scheduling. The aim is to take into account the resources (spare parts in the MMW) and maintenance actions for a given operating budget. A modular approach for modelling a multi-site structure is proposed to achieve the aim of improving the availability of facilities on production sites while minimising the cost of maintenance.

  3. 14 CFR 121.1113 - Fuel tank system maintenance program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel tank system maintenance program. 121... Improvements § 121.1113 Fuel tank system maintenance program. (a) Except as provided in paragraph (g) of this... capacity of 7500 pounds or more. (b) For each airplane on which an auxiliary fuel tank is installed under a...

  4. Maintenance of Certification®, Maintenance of Public Trust

    Science.gov (United States)

    Chung, Kevin C.; Clapham, Philip J.; Lalonde, Donald H.

    2010-01-01

    The Maintenance of Certification® (MOC) program has been well received by many physicians, but faced significant opposition from others, who complain that it is overly tedious, costly, and irrelevant to their practice. This article offers a consolidated and concise history of the MOC program and a summary of what plastic surgeons need to know to successfully complete the American Board of Plastic Surgery’s (ABPS) own MOC requirements. The authors have justified each step of the ABPS’s MOC process in terms of how it improves the quality of care delivered to Plastic Surgery patients. Finally, a summary of research is presented that demonstrates both that the public supports the MOC process for all physicians and that continuing education and formal assessment and improvement initiatives have been linked in multiple studies to a better and more evidence-based medical practice. PMID:21285803

  5. Converging Technologies for Improving Human Performance: Integrating From the Nanoscale

    International Nuclear Information System (INIS)

    Roco, M.C.; Bainbridge, W.S.

    2002-01-01

    In the early decades of the twenty-first century, concentrated efforts can unify science based on the unity of nature, thereby advancing the combination of nanotechnology, biotechnology, information technology, and new humane technologies based in cognitive science. Converging technologies integrated from the nanoscale could determine a tremendous improvement in human abilities and societal outcomes. This is a broad, cross cutting, emerging, and timely opportunity of interest to individuals, society, and humanity in the long term.About eighty scientific leaders, industry experts, and policy makers across a range of fields have contributed to develop a vision for the potential to improve human physical, mental, and social capabilities through the convergence of the four technologies. Six major themes have emerged: (a) The broad potential of converging technologies; (b) Expanding human cognition and communication; (c) Improving human health and physical capabilities; (d) Enhancing group and societal outcomes; (e) National security, and (f) Unifying science and education. This article summarizes the observations, conclusions, and recommendations made in the report (Roco and Bainbridge, eds., 2002. Converging Technologies for Improving Human Performance, NSF-DOC Report, June 2002, Arlington VA, USA)

  6. Feasibility study of component risk ranking for plant maintenance

    International Nuclear Information System (INIS)

    Ushijima, Koji; Yonebayashi, Kenji; Narumiya, Yoshiyuki; Sakata, Kaoru; Kumano, Tetsuji

    1999-01-01

    Nuclear power is the base load electricity source in Japan, and reduction of operation and maintenance cost maintaining or improving plant safety is one of the major issues. Recently, Risk Informed Management (RIM) is focused as a solution. In this paper, the outline regarding feasibility study of component risk ranking for plant maintenance for a typical Japanese PWR plant is described. A feasibility study of component risk raking for plant maintenance optimization is performed on check valves and motor-operated valves. Risk ranking is performed in two steps using probabilistic analysis (quantitative method) for risk ranking of components, and deterministic examination (qualitative method) for component review. In this study, plant components are ranked from the viewpoint of plant safety / reliability, and the applicability for maintenance is assessed. As a result, distribution of maintenance resources using risk ranking is considered effective. (author)

  7. Improving maintenance medication adherence in adult inflammatory bowel disease patients: a pilot study

    Directory of Open Access Journals (Sweden)

    Michelle L. Matteson-Kome

    2014-01-01

    Full Text Available Medication nonadherence in inflammatory bowel disease (IBD may lead to suboptimal control of the disease, decreased quality of life, and poor outcomes. This pilot study evaluated the feasibility, intervention mechanism, and potential effectiveness of a three-month continuous self-improvement (CSI intervention to enhance medication adherence (MA in adult nonadherent IBD patients. Adult IBD patients taking a daily or twice-daily dosed maintenance medication were screened electronically for two months to determine baseline MA levels. Nonadherent IBD participants were randomized to the CSI or the attention control (AC intervention and monitored for three months. The CSI intervention consisted of a data evaluation and system refinement process in which system changes were identified and implemented. The AC group was given educational information regarding IBD disease process, extra-intestinal manifestations of IBD, and medical therapy. Demographic statistics, change scores for within and between- group differences, and effect size estimates were calculated. Nine nonadherent participants (medication adherence score <0.85 were eligible for randomization. The intervention was found feasible and acceptable. Although no statistically significant improvement in MA was found (P=0.14, adherence improved in 3 of 4 of the CSI group and 1 of 2 in the attention control group. The effect size calculation of 1.9 will determine the sample size for future study. The results of this pilot study showed the intervention was feasible and had a positive effect on MA change score and adherence levels. A larger fully powered study is needed to test of the effectiveness of this innovative intervention.

  8. A comparative evaluation plan for the Maintenance, Inventory, and Logistics Planning (MILP) System Human-Computer Interface (HCI)

    Science.gov (United States)

    Overmyer, Scott P.

    1993-01-01

    The primary goal of this project was to develop a tailored and effective approach to the design and evaluation of the human-computer interface (HCI) to the Maintenance, Inventory and Logistics Planning (MILP) System in support of the Mission Operations Directorate (MOD). An additional task that was undertaken was to assist in the review of Ground Displays for Space Station Freedom (SSF) by attending the Ground Displays Interface Group (GDIG), and commenting on the preliminary design for these displays. Based upon data gathered over the 10 week period, this project has hypothesized that the proper HCI concept for navigating through maintenance databases for large space vehicles is one based upon a spatial, direct manipulation approach. This dialogue style can be then coupled with a traditional text-based DBMS, after the user has determined the general nature and location of the information needed. This conclusion is in contrast with the currently planned HCI for MILP which uses a traditional form-fill-in dialogue style for all data access and retrieval. In order to resolve this difference in HCI and dialogue styles, it is recommended that comparative evaluation be performed which combines the use of both subjective and objective metrics to determine the optimal (performance-wise) and preferred approach for end users. The proposed plan has been outlined in the previous paragraphs and is available in its entirety in the Technical Report associated with this project. Further, it is suggested that several of the more useful features of the Maintenance Operations Management System (MOMS), especially those developed by the end-users, be incorporated into MILP to save development time and money.

  9. Six Sigma methodology as a road to intelligent maintenance

    Directory of Open Access Journals (Sweden)

    Michał Zasadzień

    2017-06-01

    Full Text Available An enterprise which is managed in a modern way should be based on the concept of knowledge management. It is particularly important in the case of processes related to facility maintenance, where the efficiency and effectiveness of work is directly connected with the employees’ knowledge. Improvement of processes involved in facility maintenance has a real influence on the productivity of a manufacturing enterprise. High accessibility of technical equipment and its correct functioning influence not only production efficiency but also the quality of products and the safety of operators. The article is a description of an attempt to implement one of quality engineering methods for improving the facility maintenance process. The author decided to use the 8D method to shorten the duration of downtimes caused by breakdowns. Owing to the conducted analysis and the implementation of the improvement and preventive actions, we were able to shorten the duration of a downtime of a machine having a crucial importance for the company. Investigations and implementation were conducted in one of Silesian production plants.

  10. Development of the tool infrastructure for implementation of the maintenance rule

    International Nuclear Information System (INIS)

    Lo, Chung-Kung; Hsu, Pi-Lin

    2009-01-01

    INER PSA Group helps the three operating plants in Taiwan to decide the importance of their scoped-in equipment in terms of risk significance and develop the application database software (MEMOS) to implement the maintenance effectiveness monitoring process. NER also develops a software tool (MIRU) used in the on-line maintenance scheduling and risk assessment process. It serves as a platform for the plants to plan their daily maintenance activities and perform the risk assessment in the future rolling on-line maintenance. The implementation of routine on-line maintenance will be a critical step towards improving the capacity factors and thus further enhancement of the performance of nuclear power in Taiwan

  11. [A comparative study of maintenance services using the data-mining technique].

    Science.gov (United States)

    Cruz, Antonio M; Aguilera-Huertas, Wilmer A; Días-Mora, Darío A

    2009-08-01

    The main goal in this research was comparing two hospitals' maintenance service quality. One of them had a contract service; the other one had an in-house maintenance service. The authors followed the next stages when conducting this research: domain understanding, data characterisation and sample reduction, insight characterisation and building the TAT predictor. Multiple linear regression and clustering techniques were used for improving the efficiency of corrective maintenance tasks in a clinical engineering department (CED). The indicator being studied was turnaround time (TAT). The institution having an in-house maintenance service had better quality indicators than the contract maintenance service. There was lineal dependence between availability and service productivity.

  12. Aircraft Maintenance Engineering: Factors Impacting Airlines E-Maintenance Technologies, Authoring and Illustrations

    Science.gov (United States)

    Karayianes, Frank

    The purpose of this research was to evaluate factors influencing acceptance and use of technologies in the field of aircraft maintenance authoring, graphics, and documentation. Maintenance engineering authors convert complex engineering used in aircraft production and transform that data using technology (tools) into usable technical publications data. While the current literature includes a large volume of research in technology acceptance in various domains of industry and business, the problem is that no such studies exist with respect to the aircraft maintenance engineering authoring, allowing any number of tools to be used and acceptance to be unsure. The study was based on theoretical approaches of the Technology Acceptance Model and the associated hypothesis related to eight research questions. A survey questionnaire was developed for data collection from a selected population of aircraft maintenance engineering authors. Data collected from 148 responses were exposed to a range of statistical methods and analyses. Analysis of data were performed within the structural equation model using exploratory factor analysis, confirmatory factor analysis, and a range of regression methods. The analyses generally provided results consistent with prior literature. Two survey questions yielded unexpected results contrary to similar studies. The relationship between prior experience and job level did not show a significant relationship with perceived usefulness or perceived ease of use. Other results included the significant relationship between Perceived Usefulness and Perceived Ease of Use with Technology acceptance. Recommendations include understanding how Technology Acceptance can be improved for the industry and the need for further research not covered to refine recommendations for technology acceptance related to the aviation industry.

  13. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  14. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  15. Maintenance of BWR control rod drive mechanisms

    International Nuclear Information System (INIS)

    Greene, R.H.

    1991-01-01

    Control rod drive mechanism (CRDM) replacement and rebuilding is one of the highest dose, most physically demanding, and complicated maintenance activities routinely accomplished by BWR utilities. A recent industry workshop sponsored by the Oak Ridge National Laboratory, which dealt with the effects of CRDM aging, revealed enhancements in maintenance techniques and tooling which have reduced ALARA, improved worker comfort and productivity, and have provided revised guidelines for CRDM changeout selection. Highlights of this workshop and ongoing research on CRDM aging are presented in this paper

  16. Simulation-based man-machine interface evaluation for plant maintenance facilities

    International Nuclear Information System (INIS)

    Nakagawa, Takashi; Kitamura, Masashi; Nakatani, Yoshio; Umeda, Yoshikazu

    1998-01-01

    Although a lot of human errors has occurred in the maintenance of power plants, systematic approaches to the reduction of human error are not sufficient compared with those applied to operations. The authors propose a new method of evaluating and analyzing human interface design from the viewpoint of human error reduction, and have implemented the method on the DIAS system. This system consists of maintenance personnel and equipment interface simulators, and it generates a dynamic interaction between humans and the working environment. The DIAS system can calculate the human error rate and their weighted calculations according to dangerousness, the influence on the equipment, and the influence on the plant of each task by THERP, and can carry out the dynamic analysis of the panel selection error index if there is similar equipment in the neighborhood, the working time, the distance of movement, and the distance of eye movement. The authors applied this system to evaluate the interface design of actual Transformer Protection Relay Panels and their layout in a room in a nuclear power plant. Our customer accepted our evaluation and proposals modifying the panel design. (author)

  17. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  18. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  19. Nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1981-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  20. Military Real Property Maintenance: Management Improvements are needed to Ensure Adequate Facilities

    National Research Council Canada - National Science Library

    Chan, Kwai-Cheung

    2000-01-01

    ... about $5 billion for each of the past 4 years (fiscal years 1996-1999). Separate accounts are used to fund maintenance and repair of family housing, many industrial-related facilities, and many military medical facilities...

  1. Hardware and software maintenance strategies for upgrading vintage computers

    International Nuclear Information System (INIS)

    Wang, B.C.; Buijs, W.J.; Banting, R.D.

    1992-01-01

    The paper focuses on the maintenance of the computer hardware and software for digital control computers (DCC). Specific design and problems related to various maintenance strategies are reviewed. A foundation was required for a reliable computer maintenance and upgrading program to provide operation of the DCC with high availability and reliability for 40 years. This involved a carefully planned and executed maintenance and upgrading program, involving complementary hardware and software strategies. The computer system was designed on a modular basis, with large sections easily replaceable, to facilitate maintenance and improve availability of the system. Advances in computer hardware have made it possible to replace DCC peripheral devices with reliable, inexpensive, and widely available components from PC-based systems (PC = personal computer). By providing a high speed link from the DCC to a PC, it is now possible to use many commercial software packages to process data from the plant. 1 fig

  2. Reliability centered Maintenance (RCM) program for Chashma NPP (CHASNUPP)

    International Nuclear Information System (INIS)

    Khalid, S.; Khan, S.A.

    2000-01-01

    This paper describes the proposed Reliability Centered Maintenance (RCM) program for Chashma Nuclear Power Plant (CHASNUPP). Major steps are the identification of risk critical components and the implementation of RCM procedures. Identification of risk critical components is based upon the CHASNUPP level 1 PSA results (performed under IAEA TC Project PAK/9/019) which is near completion. The other requirements for implementation of RCM program is the qualitative analysis to be performed for identifying the dominant potential failure modes of each risk critical component and determination of the necessary maintenance activities, required to ensure reliable operation of the identified risk critical components. Implementation of RCM program for these components will lead to improvement in plant availability and safety together with reduction in the maintenance cost. Development - implementation of RCM program at this stage will help the CHASNUPP Maintenance department who is now developing the maintenance program - procedures for CHASNUPP. (author)

  3. Use of passive systems to improve plant operation and maintenance

    International Nuclear Information System (INIS)

    Shah, D.

    2000-01-01

    In a deregulated future, a utility's strength will depend on its ability to be cost competitive in the marketplace. However, the competitive advantage of nuclear power will depend on each owner's ability to reduce Operating and Maintenance (O and M) costs without sacrificing nuclear safety. The use of passive systems (i.e., systems without any moving parts) can reduce plant O and M costs while increasing safety in nuclear power plants. (author)

  4. The role of knowledge sharing and transactive memory system on condition based maintenance policy

    NARCIS (Netherlands)

    Koochaki, J.; Bouwhuis, I. M.

    2008-01-01

    Today, Condition Based Maintenance (CBM) has reached a sophisticated level in industry and the advantages of predictive maintenance are accepted globally. However, although lots of effort has been put into improving methods and techniques in CBM, most of predictive maintenance programs fail to

  5. Study on the improvement of working environment at night in maintenance works at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hiramoto, Mitsuru; Kotani, Fumio [Institute of Nuclear Safety System Inc., Seika, Kyoto (Japan)

    2000-09-01

    At the maintenance work site in nuclear power plants, due to the shortening (reduction of a regular inspection period) of the regular inspection period, the tendency toward working on around-the-clock basis has increased; thus, nighttime work is on the rise. Based upon research both locally and internationally, as well as examples of measures against such a tendency and the results of on-site surveys of the environment surrounding maintenance works at nuclear power plants, the author comprehensively studied the effects of nighttime work on workers, the measures to cope with the situation, and how a working environment for nighttime work should be. Based on the results, the authors made a guidebook for nighttime maintenance work at nuclear power plants. This guidebook, which deals with the subject of nighttime maintenance work at nuclear power plants, is quite unique in the world. It is expected that by using this guidebook, the quality of nighttime maintenance work and the levels of techniques/skills would be enhanced and maintained, and the safety of workers would be ensured, promoting considerably thus the establishment of a comfortable workplace. (author)

  6. Study on the improvement of working environment at night in maintenance works at nuclear power plants

    International Nuclear Information System (INIS)

    Hiramoto, Mitsuru; Kotani, Fumio

    2000-01-01

    At the maintenance work site in nuclear power plants, due to the shortening (reduction of a regular inspection period) of the regular inspection period, the tendency toward working on around-the-clock basis has increased; thus, nighttime work is on the rise. Based upon research both locally and internationally, as well as examples of measures against such a tendency and the results of on-site surveys of the environment surrounding maintenance works at nuclear power plants, the author comprehensively studied the effects of nighttime work on workers, the measures to cope with the situation, and how a working environment for nighttime work should be. Based on the results, the authors made a guidebook for nighttime maintenance work at nuclear power plants. This guidebook, which deals with the subject of nighttime maintenance work at nuclear power plants, is quite unique in the world. It is expected that by using this guidebook, the quality of nighttime maintenance work and the levels of techniques/skills would be enhanced and maintained, and the safety of workers would be ensured, promoting considerably thus the establishment of a comfortable workplace. (author)

  7. Detailed semantic analyses of human error incidents occurring at domestic nuclear power plants to fiscal year 2000

    International Nuclear Information System (INIS)

    Tsuge, Tadashi; Hirotsu, Yuko; Takano, Kenichi; Ebisu, Mitsuhiro; Tsumura, Joji

    2003-01-01

    Analysing and evaluating observed cases of human error incidents with the emphasis on human factors and behavior involved was essential for preventing recurrence of those. CRIEPI has been conducting detailed and structures analyses of all incidents reported during last 35 year based on J-HPES, from the beginning of the first Tokai nuclear power operation till fiscal year of 2000, in which total 212 human error cases are identified. Results obtained by the analyses have been stored into the J-HPES data-base. This summarized the semantic analyses on all case-studies stored in the above data-base to grasp the practical and concrete contents and trend of more frequently observed human errors (as are called trigger actions here), causal factors and preventive measures. These semantic analyses have been executed by classifying all those items into some categories that could be considered as having almost the same meaning using the KJ method. Followings are obtained typical results by above analyses: (1) Trigger action-Those could be classified into categories of operation or categories of maintenance. Operational timing errors' and 'operational quantitative errors' were major actions in trigger actions of operation, those occupied about 20% among all actions. At trigger actions of maintenance, 'maintenance quantitative error' were major actions, those occupied quarter among all actions; (2) Causal factor- 'Human internal status' were major factors, as in concrete factors, those occupied 'improper persistence' and 'lack of knowledge'; (3) Preventive measure-Most frequent measures got were job management changes in procedural software improvements, which was from 70% to 80%. As for preventive measures of operation, software improvements have been implemented on 'organization and work practices' and 'individual consciousness'. Concerning preventive measures of maintenance, improvements have been implemented on 'organization and work practices'. (author)

  8. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    International Nuclear Information System (INIS)

    Heinemann, J.L.; Millard, G.E.

    1997-08-01

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP

  9. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  10. Oil coastal tanker maintenance and availability

    Energy Technology Data Exchange (ETDEWEB)

    Goldsztejn, Eduardo; Gomez Haedo, Juan Carlos [Government' s Oil Company of Uruguay (ANCAP), Montivideo (Uruguay)

    2008-07-01

    ANCAP (Government's Oil Company of Uruguay) owns a 4000 DWT oil coastal tanker which is mainly used for oil transport in the River Plate, Uruguay and Parana rivers. Availability of the ship is critical because of shortage of available vessels in the region. Full maximum draught of the vessel is 4m , so it can navigate in very shallow waters as it is the case of some places in the Uruguay and Parana rivers. Although the ship was built in 1979, it is a complete double hull, powered by two twin main engines and propellers. Since 1994, several changes in maintenance management have been introduced, in order to increase the availability, thus increasing the total oil volume yearly transported. These changes affected several maintenance items and they also included a modification in the design of part of the cargo tank floors of the ship. As a result of these changes, an increase of 60% of the oil derivatives volume transported yearly was achieved. In this paper, some of the important improvements on maintenance practises and management are described, together with a quantification of their influence on vessel's availability and overall maintenance costs. (author)

  11. Improvement of quality of life following 6 months of methadone maintenance therapy in Malaysia.

    Science.gov (United States)

    Baharom, Nizam; Hassan, Mohd Rohaizat; Ali, Norsiah; Shah, Shamsul Azhar

    2012-08-01

    Methadone Maintenance Therapy (MMT) is one of the popular choices for drug substitution therapy and is fairly new in Malaysia. Aside from its role in harm reduction against HIV infection, MMT programme may potentially enhances clients' quality of life. This study aims to identify the impact of MMT programme on clients' quality of life after 6 months in treatment and to explore factors that may be associated with changes in their quality of life. In this retrospective report review, 122 subjects from 2 government MMT clinics were selected from the district of Tampin, Negeri Sembilan, Malaysia. The raw score from the WHO Quality of Life questionnaire (WHOQOL-BREF), at baseline and 6 months after therapy were collected and converted to 0-100 scale form to give quality of life scores for four domains; physical, psychological, social relationships and environment. Other variables of interest were socio-demography, age when joining MMT programme, age and duration of illicit drug use, HIV and Hepatitis C status, and the Opiate Treatment Index (OTI) score on drug use, sexual and social aspect at the baseline. Statistical analysis used the SPSS version 16. There was significant improvement in all four domains of quality of life, after 6 months of MMT. The largest improvement was for psychological domain (mean score difference 15.54 ± 20.81). Multivariable linear regression analysis showed that, for the physical domain, there was no significant predictor. For both the psychological and social domains, having tertiary education is a significant predictor for improvement in both aspects of quality of life. Negative HIV status is associated with improvement for the environment domain. There was a significant short term improvement in the quality of life of MMT clients who stayed in the programme for at least 6 months in the district of Tampin, Negeri Sembilan, Malaysia.

  12. The Use of the Performance Diagnostic Checklist-Human Services to Assess and Improve the Job Performance of Individuals with Intellectual Disabilities.

    Science.gov (United States)

    Smith, Madison; Wilder, David A

    2018-06-01

    The Performance Diagnostic Checklist-Human Services (PDC-HS) is an informant-based tool designed to identify the variables responsible for performance problems. To date, the PDC-HS has not been examined with individuals with intellectual disabilities. In the current study, two supervisors with intellectual disabilities completed the PDC-HS to assess the productivity of two supervisees with disabilities who performed a pricing task in a thrift store. The PDC-HS suggested that performance deficits were due to a lack of training; a PDC-HS-indicated intervention was effective to increase accurate pricing. • The PDC-HS is an informant-based tool designed to identify the variables responsible for employee performance problems in human service settings. • The PDC-HS can be completed by some individuals with intellectual disabilities in a supervisory position to identify the variables responsible for problematic job performance among their supervisees. • A PDC-HS indicated intervention was demonstrated to be effective to improve the job performance of individuals with disabilities. • The PDC-HS may be a useful tool to support performance improvement and job maintenance among individuals with intellectual disabilities.

  13. The application and practice of predictive maintenance at CANDU equipment management

    International Nuclear Information System (INIS)

    Yu Guangting

    2014-01-01

    The equipment in Qinshan CANDU unit is characterized by large number and complex structure. Some equipment failure has no relation with the operation time, it is impossible to avoid the failure of these equipment only by periodical maintenance. To improve the equipment reliability, increase the equipment usability and decrease the maintenance cost, for important equipment related to nuclear safety and generating electricity, it is required to perform condition monitoring and the predictive maintenance (PdM). According to different characteristics of equipment, it is required to use suitable equipment condition monitoring method, content and frequency. In this way, some potential equipment failure can be found, preventive maintenance can be arranged in advance, and equipment maintenance management can be optimized. (author)

  14. Development of support system for maintenance and administration of reprocessing plant equipment

    International Nuclear Information System (INIS)

    Iwasaki, Syogo; Taniguchi, Takayuki; Shiraishi, Yoshihiko; Isaka, Kazuo

    1998-01-01

    Each year, maintenance work is carried out for about 10,000 pieces of equipment, including mechanical devices, electric equipment and instruments, at the Tokai Reprocessing Plant. Ninety percent of such maintenance work is preventive maintenance. In order to manage the information about the maintenance work, a computer support system was developed between 1985 and 1992. Twenty-seven thousand pieces of equipment and 180,000 maintenance histories have already been registered in the system. The system has been used for planning inspections and replacement of equipment as well as checking their maintenance histories. Actual usage of the system has shown that some auxiliary functions need to be added. The system will therefore be improved and extended. (author)

  15. Proficiency evaluation of maintenance personnel: Training equivalency determination

    International Nuclear Information System (INIS)

    Price, W.J.

    1991-01-01

    The nuclear industry has recognized the importance of safe, quality, productive maintenance practices and has taken a number of initiatives that have generally improved maintenance programs. Because proficient maintenance practices are critical to plant safety and reliability, most plants have also recognized the need for reliable, valid testing techniques that demonstrate and assure the competence of their maintenance personnel. Until now, resource demands were too great to develop in-plant testing programs. In the past, maintenance supervisors have exempted personnel from training, using informal judgment of the employees' previous training and experience and informal observation of the employee on the job. While this procedure may have some degree of validity, it fails to provide the documentation for training equivalency that is required to satisfy the US Nuclear Regulatory Commission (NRC) regulations and Institute of Nuclear Power Operations (INPO) guidelines. To assess and demonstrate the proficiency levels of personnel, Calvert Cliffs needed to establish an objective, reliable, time-saving, and valid system to evaluate the competency levels of personnel. This was done in a joint effort with the Electric Power Research Institute

  16. Costs of performance based maintenance for local roads: Case study Albania

    OpenAIRE

    Jokanović Igor; Grujić Bojana; Zeljić Dragana; Grujić Žarko; Svilar Mila

    2017-01-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inade...

  17. Review of some aspects of human reliability quantification

    International Nuclear Information System (INIS)

    Lydell, B.O.Y.; Spurgin, A.J.; Hannaman, G.W.; Lukic, Y.D.

    1986-01-01

    An area in systems reliability considered to be weak, is the characterization and quantification of the role of the operations and maintenance staff in combatting accidents. Several R and D programs are underway to improve the modeling of human interactions and some progress has been made. This paper describes a specific aspect of human reliability analysis which is referred to as modeling of cognitive processes. In particular, the basis for the so- called Human Cognitive Reliability (HCR) model is described and the focus is on its validation and on its benefits and limitations

  18. Effective maintenance practices to manage system aging

    International Nuclear Information System (INIS)

    Chockie, A.; Bjorkelo, K.

    1992-01-01

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies

  19. Perencanaan Kegiatan Maintenance Dengan Metode Reability Centered Maintenance (Rcm) II

    OpenAIRE

    Rachmad Hidayat; Nachnul Ansori; Ali Imron

    2010-01-01

    Maintenance Activity Planning by Reability Centered Maintenance (RCM) II Method. This research discussmaintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation isgiven to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation.From the research results with RPN points out that critical component that needs to get main priority in givemaintenance on compresor screw are bust logistic on timeworn...

  20. Study on how to evaluate the effectiveness of maintenance activities for giant complex plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki

    2010-01-01

    If we try to check the effectiveness of maintenance activities in nuclear power plant, it is necessary to evaluate plant performance from the viewpoint of nuclear safety and economy. So, in this paper, after the relation among maintenance optimization, maintenance performance targets, maintenance effectiveness indicator and maintenance key parameters important to nuclear safety and economy was made clear, a method to evaluate the effectiveness of maintenance activities was discussed. As a result of consideration, it was concluded that the maintenance effectiveness indicator proposed in this paper can evaluate maintenance effectiveness and can show the direction of improving existing maintenance program because the relation with maintenance performance target and maintenance key parameters is clear. (author)

  1. Terroir as a Concept to Improve Human Health

    Science.gov (United States)

    Brevik, Eric C.; Steffan, Joshua J.; Burgess, Lynn C.; Cerdà, Artemi; Pereg, Lily

    2017-04-01

    Soil is important to human health because of the ability of healthy soils to supply nutrients through food products, medications derived from soil, its ability to clean water, and for many other positive reasons. On the other hand, degraded soils can have negative impacts on human health through processes such as dust generation and by acting as a point of human contact with heavy metals, organic chemicals, and pathogens. Despite the definite links between soil and human health, it is likely that most people don't think about soil when considering human health issues. In fact, there appears to be a disconnect between most people in our modern society and soil, and when people do notice soil it often seems to be in a negative context, leading to terms such as "soiled", "dirty", "dirt poor", etc. People pay attention to and care for things that matter to them, and creating a more positive public image of soil has the possibility of improving human health by leading to careful and caring treatment of the soil resource. The concept of terroir is a good example of a setting within which soils have a more positive image. While terroir originally established a connection between those who love wine and the soils that produce those wines, the concept has been expanded to many additional products such as cacao, cheese, coffee, fruits, olive oil, and vegetables. If the terroir concept could be expanded to include additional products that are important to people and expanded into parts of the world where it is not currently well known, that may provide an increased positive perception of soil, and thereby indirectly improve human health. It may even be possible to provide a terroir link to direct health benefits, such as medications derived from a given soil environment, and therefore provide a very focused emphasis on soil and human health issues. Therefore, we advocate a concerted effort to expand the terroir concept as a means to improve overall human health.

  2. Using lean methodology to improve efficiency of electronic order set maintenance in the hospital.

    Science.gov (United States)

    Idemoto, Lori; Williams, Barbara; Blackmore, Craig

    2016-01-01

    Order sets, a series of orders focused around a diagnosis, condition, or treatment, can reinforce best practice, help eliminate outdated practice, and provide clinical guidance. However, order sets require regular updates as evidence and care processes change. We undertook a quality improvement intervention applying lean methodology to create a systematic process for order set review and maintenance. Root cause analysis revealed challenges with unclear prioritization of requests, lack of coordination between teams, and lack of communication between producers and requestors of order sets. In March of 2014, we implemented a systematic, cyclical order set review process, with a set schedule, defined responsibilities for various stakeholders, formal meetings and communication between stakeholders, and transparency of the process. We first identified and deactivated 89 order sets which were infrequently used. Between March and August 2014, 142 order sets went through the new review process. Processing time for the build duration of order sets decreased from a mean of 79.6 to 43.2 days (pLean production principles to the order set review process resulted in significant improvement in processing time and increased quality of orders. As use of order sets and other forms of clinical decision support increase, regular evidence and process updates become more critical.

  3. Putting your human resource department to work for you.

    Science.gov (United States)

    McConnell, C R

    1991-06-01

    As a staff function, human resources is organized as a service activity. Service activities render no patient care; they do not advance the work of the organization. However, they support the performance of the organization's work and in a practical sense become necessary. For example, if a pure service, such as building maintenance, did not exist, the facility's physical plant would gradually self-destruct. Similarly, without human resources to see to the maintenance of the work force, the overall suitability and capability of that work force will steadily erode. Recognize human resources for what it is--an essential service function required to help the organization run as efficiently as possible. Learn what the HR department does, and especially learn why the department does what it does. Provide input to the human resource department. Forge a continuing working relationship with the HR department, making it clear that you expect service from this essential service department. Challenge the HR department to do more, to do better, and to continually improve service--and put the human resource department to work for you and your employees.

  4. Transfer of technology in maintenance tools

    International Nuclear Information System (INIS)

    Delorme, H.; Cartry, J.P.

    1985-10-01

    For maximum reliability of maintenance operations, FRAMATOME has aimed to improve the accessibility of highly irradiated and contaminated reactor coolant system equipment by the active promotion of an automation and robotization strategy. A number of robot designs have been developed providing replacement of operators inside the steam generator channel head, smooth handling of heavy or cumbersome objects in this zone, easy marking of steam generator tubes and increased speed of repetitive channel head operations: maintenance spider, theta-theta prime robotic service arm, R-theta robotic service arm, remote manipulator arm. Two operations are described: channel head folding cover plate and, operation of the torquing machine for head cover plate

  5. Contribution to the Optimization of Strategy of Maintenance by Lean Six Sigma

    Science.gov (United States)

    Youssouf, Ayadi; Rachid, Chaib; Ion, Verzea

    The efficiency of the maintenance of the industrial systems is a major economic stake for their business concern. The main difficulties and the sources of ineffectiveness live in the choice of the actions of maintenance especially when the machine plays a vital role in the process of production. But as Algeria has embarked on major infrastructure projects in transport, housing, automobile, manufacturing industry and construction (factories, housing, highway, subway, tram, etc.) requiring new implications on maintenance strategies that meet industry requirements imposed by the exploitation. From then on and seen the importance of the maintenance on the economic market and sound impacts on the performances of the installations, methods of optimization were developed. For this purpose, to ensure the survival of businesses, be credible, contributing and competitive in the market, maintenance services must continually adapt to the progress of technical areas, technological and organizational even help maintenance managers to construct or to modify maintenance strategies, objective of this work. Our contribution in this work focuses on the optimization of maintenance for industrial systems by the use of Lean six Sigma bases. Lean Six Sigma is a method of improving the quality and profitability based on mastering statically of process and it is also a management style that based on a highly regulated organization dedicated to managing project. The method is based on five main steps summarized in the acronym (DMAIC): Define Measure, Analyze, Improve and Control. Application of the method on the maintenance processes with using maintenance methods during the five phases of the method will help to reduce costs and losses in order to strive for optimum results in terms of profit and quality.

  6. On the concept of e-maintenance: Review and current research

    International Nuclear Information System (INIS)

    Muller, Alexandre; Crespo Marquez, Adolfo; Iung, Benoit

    2008-01-01

    The importance of the maintenance function has increased because of its role in keeping and improving system availability and safety, as well as product quality. To support this role, the development of the communication and information technologies has allowed the emergence of the concept of e-maintenance. Within the era of e-manufacturing and e-business, e-maintenance provides the opportunity for a new maintenance generation. As we will discuss later in this paper, e-maintenance integrates existing telemaintenance principles, with Web services and modern e-collaboration principles. Collaboration allows to share and exchange not only information but also knowledge and (e)-intelligence. By means of a collaborative environment, pertinent knowledge and intelligence become available and usable at the right place and time, in order to facilitate reaching the best maintenance decisions. This paper outlines the basic ideas within the e-maintenance concept and then provides an overview of the current research and challenges in this emerging field. An underlying objective is to identify the industrial/academic actors involved in the technological, organizational or management issues related to the development of e-maintenance. Today, this heterogeneous community has to be federated in order to bring up e-maintenance as a new scientific discipline

  7. Maintenance and fabrication of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Han, Kwang Soo; Chung, Chong Eun; Park, Kwang Hyeon; Hong, Suk Boong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jung Bok

    1996-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation cost of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. (author). 10 refs., 18 tabs., 8 figs.

  8. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Han, Kwang Soo; Chung, Chong Eun; Park, Kwang Hyeon; Hong, Suk Boong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jung Bok.

    1996-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation cost of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. (author). 10 refs., 18 tabs., 8 figs

  9. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Han, Kwang Soo; Jeong, Jong Eun; Park, Kwang Hyun; Hong, Suk Bong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jeong Bok

    1995-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation costs of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. 18 tabs., 17 figs., 13 refs. (Author) .new

  10. Maintenance and fabrication of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Han, Kwang Soo; Jeong, Jong Eun; Park, Kwang Hyun; Hong, Suk Bong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jeong Bok [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation costs of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. 18 tabs., 17 figs., 13 refs. (Author) .new.

  11. Preventive maintenance technology for nuclear power stations

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo

    1992-01-01

    With the increase of the number of nuclear power plants in operation and the number of years of operation, the improvement of reliability and the continuation of safe operation have become more important, and the expectation for preventive maintenance technology has also heightened. The maintenance of Japanese nuclear power plants is based on the time schedule maintenance mainly by the regular inspection carried out every year, but the monitoring of the conditions of various machinery and equipment in operation has been performed widely. In this report, the present state of checkup and inspection technologies and the monitoring and diagnostic technologies for operational condition, which are the key technologies of preventive maintenance, are described. As the checkup and inspection technologies, ultrasonic flow detection technology, phased array technology, Amplituden und Laufzeit Orts Kurven method and X-ray CT, and as the monitoring and diagnostic technologies for operational condition, the diagnosis support system for BWR plants 'PLADIS', those for rotary machines, those for turbogenerators, those for solenoid valves, the mechanization of patrol works and the systematizing technology are reported. (K.I.)

  12. Progress with the national infrastructure maintenance strategy

    CSIR Research Space (South Africa)

    Wall, K

    2008-07-01

    Full Text Available infrastructure investment and maintenance that will result from this strategy will not only improve infrastructure performance and underpin services sustainability, but will also contribute significantly towards national and local economic growth and will add...

  13. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  14. The role of maintenance thalidomide therapy in multiple myeloma: MRC Myeloma IX results and meta-analysis.

    Science.gov (United States)

    Morgan, Gareth J; Gregory, Walter M; Davies, Faith E; Bell, Sue E; Szubert, Alexander J; Brown, Julia M; Coy, Nuria N; Cook, Gordon; Russell, Nigel H; Rudin, Claudius; Roddie, Huw; Drayson, Mark T; Owen, Roger G; Ross, Fiona M; Jackson, Graham H; Child, J Anthony

    2012-01-05

    Thalidomide maintenance has the potential to modulate residual multiple myeloma (MM) after an initial response. This trial compared the effect of thalidomide maintenance and no maintenance on progression-free survival (PFS) and overall survival (OS) in MM patients. After intensive or nonintensive induction therapy, 820 newly diagnosed MM patients were randomized to open-label thalidomide maintenance until progression, or no maintenance. Interphase FISH (iFISH) analysis was performed at study entry. Median PFS was significantly longer with thalidomide maintenance (log-rank P < .001). Median OS was similar between regimens (log-rank P = .40). Patients with favorable iFISH showed improved PFS (P = .004) and a trend toward a late survival benefit. Patients with adverse iFISH receiving thalidomide showed no significant PFS benefit and worse OS (P = .009). Effective relapse therapy enhanced survival after progression, translating into a significant OS benefit. Meta-analysis of this and other studies show a significant late OS benefit (P < .001, 7-year difference hazard ratio = 12.3; 95% confidence interval, 5.5-19.0). Thalidomide maintenance significantly improves PFS and can be associated with improved OS. iFISH testing is important in assessing the clinical impact of maintenance therapy. Overview analysis demonstrated that thalidomide maintenance was associated with a significant late OS benefit. This trial was registered at www.isrctn.org as #ISRCTN68454111.

  15. Emergence and maintenance of menopause in humans: A game theory model.

    Science.gov (United States)

    Thouzeau, Valentin; Raymond, Michel

    2017-10-07

    Menopause, the permanent cessation of ovulation, occurs in women well before the end of their expected life span. Several adaptive hypotheses have been proposed to solve this evolutionary puzzle, each based on a possible fitness benefit derived from an early reproductive senescence, but no consensus has emerged. The construction of a game theory model allowed us to jointly study the main adaptive hypotheses in emergence and maintenance of menopause. Four classical hypotheses on the benefits of menopause were considered (decreased maternal mortality, increased grandmothering, decreased conflict over reproductive resources between older and younger females, and changes in their relatedness) plus a fifth one derived from a possible pleiotropic trade-off. Interestingly, the conditions for the emergence of menopause are more restrictive than those for its maintenance due to the social and familial changes induced by the occurrence of non-reproductive older women. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Implementing a least cost and risk focused maintenance process

    International Nuclear Information System (INIS)

    Darling, S.S.

    1996-01-01

    The paper will focus on the vital role maintenance, big ''M'' (spares, PM program, planning and scheduling, turning the wrench), has in preserving return of investment, and safety in operation of high risk high value facilities/platforms. The maintenance process of today and for the future must utilize risk assessment and reliability engineering techniques to prioritize plant resources. The new process must provide for high levels of safety assurance yet allow for improved generation and transmission capacity while maintaining adequate system reliability. This approach ultimately leads to continuous and sustained reduction in operating cost, improved production capacity, and a safety culture based upon a risk determent cost-beneficial decision process

  17. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  18. Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects

    Directory of Open Access Journals (Sweden)

    Alena Conrads

    2018-03-01

    Full Text Available Tunnel boring machines require extensive maintenance and inspection effort to provide a high availability. The cutting tools of the cutting wheel must be changed timely upon reaching a critical condition. While one possible maintenance strategy is to change tools only when it is absolutely necessary, tools can also be changed preventively to avoid further damages. Such different maintenance strategies influence the maintenance duration and the overall project performance. However, determine downtime related to a particular maintenance strategy is still a challenging task. This paper shows an analysis of the robustness to achieve the planned project performance of a maintenance strategy considering uncertainties of wear behavior of the cutting tools. A simulation based analysis is presented, implementing an empirical wear prediction model. Different strategies of maintenance planning are compared by performing a parameter variation study including Monte-Carlo simulations. The maintenance costs are calculated and evaluated with respect to their robustness. Finally, an improved and robust maintenance strategy has been determined. Keywords: Mechanized tunneling, Maintenance, Wear of cutting tools, Process simulation, Robustness, Uncertainty modeling

  19. The nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1982-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  20. Multi-level predictive maintenance for multi-component systems

    International Nuclear Information System (INIS)

    Nguyen, Kim-Anh; Do, Phuc; Grall, Antoine

    2015-01-01

    In this paper, a novel predictive maintenance policy with multi-level decision-making is proposed for multi-component system with complex structure. The main idea is to propose a decision-making process considered on two levels: system level and component one. The goal of the decision rules at the system level is to address if preventive maintenance actions are needed regarding the predictive reliability of the system. At component level the decision rules aim at identifying optimally a group of several components to be preventively maintained when preventive maintenance is trigged due to the system level decision. Selecting optimal components is based on a cost-based group improvement factor taking into account the predictive reliability of the components, the economic dependencies as well as the location of the components in the system. Moreover, a cost model is developed to find the optimal maintenance decision variables. A 14-component system is finally introduced to illustrate the use and the performance of the proposed predictive maintenance policy. Different sensitivity analysis are also investigated and discussed. Indeed, the proposed policy provides more flexibility in maintenance decision-making for complex structure systems, hence leading to significant profits in terms of maintenance cost when compared with existing policies. - Highlights: • A predictive maintenance policy for complex structure systems is proposed. • Multi-level decision process based on prognostic results is proposed. • A cost-based group importance measure is introduced for decision-making. • Both positive and negative dependencies between components are investigated. • A cost model and Monte Carlo simulation are developed for optimization process.

  1. Optimal maintenance work organization and technical education

    International Nuclear Information System (INIS)

    Toshiro Kitamura

    2005-01-01

    Under Japanese multi-layered maintenance routines, almost 100% of work is delegated to outside contractors. For taking such form, there are several reasons unique to Japan. U.S. maintenance work organization makes a contrast, reducing the volume of subcontract in these past ten years. On the other hand, France has a trend of increasing the volume of subcontract for cost reduction that is expected in liberalization and privatization. In Japan, since the subcontract went too far, there is a trend that the multi-layered subcontract structure will be relieved. The Japan Atomic Power, Inc., has organized a team that performs a part of maintenance work by employees themselves since three years before. Direct work is effective to greatly supporting the employees' technical ability. It is expected that the quality of subcontract management will be markedly improved from now on. (author)

  2. Integrated Design and Approach of Building Maintenance Management in the Built Environment

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2017-12-01

    Full Text Available Building maintenance is such a crucial aspect in the construction industry. The construction industry is characterized as a project-based industry that delivers one of a kind products and services. Thus, building maintenance can guarantee the safety of buildings including human health and property. To some extent, it plays as a guard to supervise the buildings protecting them being suffered collapse and deterioration. The most importantly, preparing for maintenance carried out on buildings is complex and it is related to procurement system dramatically, such as design-and-build, design-build-finance operate, and the private finance initiative and public/private partnerships, all of them need to give much consideration of operational and maintenance needs and costs which are ongoing.. This paper will focus on design and approach of building maintenance management in the construction industry.

  3. National plan to enhance aviation safety through human factors improvements

    Science.gov (United States)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  4. Education as a Basic Element of Improving Professional Important Qualities of Aviation Technical Maintenance Personnel

    Directory of Open Access Journals (Sweden)

    Gorbačovs Oļegs

    2016-12-01

    Full Text Available In this article the importance of professional qualities, competence and their increase, directly dependent on the training of aviation technical maintenance personnel and determination the level of flight safety is covered. This publication analyses necessary training and requirements for aviation technical personnel involved in aircraft maintenance, as well as the requirements for aviation training organizations, defined as per Part-147, for such personnel preparation and training.

  5. Model-based fault diagnosis framework for effective predictive maintenance / B.B. Akindele

    OpenAIRE

    Akindele, Babatunde Babajide

    2010-01-01

    Predictive maintenance is a proactive maintenance strategy that is aimed at preventing the unexpected failure of equipment through condition monitoring of the health and performance of the equipment. Incessant equipment outage resulting in low availability of production facilities is a major issue in the Nigerian manufacturing environment. Improving equipment availability in Nigeria industry through institution of a full featured predictive maintenance has been suggested by many authors. T...

  6. BALTICA IV. Plant maintenance for managing life and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hietanen, S; Auerkari, P [eds.; VTT Manufacturing Technology, Espoo (Finland). Operational Reliability

    1999-12-31

    BALTICA IV International Conference on Plant Maintenance Managing Life and performance held on September 7-9, 1998 on board M/S Silja Symphony on its cruise between Helsinki-Stockholm and at Aavaranta in Kirkkonummi. The BALTICA IV conference provides a forum for the transfer of technology from applied research to practice. This is one of the two volumes of the proceedings of the BALTICA IV International Conference on Plant Maintenance Managing Life and Performance. The BALTICA IV conference focuses on new technology, recent experience and applications of condition and life management, and on improvements in maintenance strategies for safe and economical operation of power plants. (orig.)

  7. BALTICA IV. Plant maintenance for managing life and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hietanen, S.; Auerkari, P. [eds.] [VTT Manufacturing Technology, Espoo (Finland). Operational Reliability

    1998-12-31

    BALTICA IV International Conference on Plant Maintenance Managing Life and performance held on September 7-9, 1998 on board M/S Silja Symphony on its cruise between Helsinki-Stockholm and at Aavaranta in Kirkkonummi. The BALTICA IV conference provides a forum for the transfer of technology from applied research to practice. This is one of the two volumes of the proceedings of the BALTICA IV International Conference on Plant Maintenance Managing Life and Performance. The BALTICA IV conference focuses on new technology, recent experience and applications of condition and life management, and on improvements in maintenance strategies for safe and economical operation of power plants. (orig.)

  8. Maintenance therapy in advanced non-small cell lung cancer: current status and future implications.

    Science.gov (United States)

    Stinchcombe, Thomas E; Socinski, Mark A

    2011-01-01

    Maintenance therapy for patients with advanced non-small cell lung cancer has been an area of intense investigation. Maintenance therapy has been divided into two broad categories: continuation maintenance when the chemotherapy or targeted agent was part of a defined number of cycles of combination therapy and in the absence of disease progression is continued as a single agent or switch maintenance when a third agent is initiated after four cycles of platinum-based double-agent chemotherapy in the absence of disease progression. Two monoclonal antibodies, cetuximab and bevacizumab, are used as continuation maintenance, but the incremental benefit of the maintenance therapy with these agents is undetermined. Phase III trials have not revealed an overall survival benefit for continuation maintenance chemotherapy, and this approach should be considered investigational. Phase III trials have demonstrated an improvement in overall survival with switch maintenance therapy with pemetrexed compared with placebo in patients with nonsquamous histology and erlotinib compared with placebo. Phase III trials have not revealed an improvement in quality of life with maintenance therapy. In the trials of maintenance therapy, 30 to 40% of patients enrolled in the observation or placebo arm did not receive second-line therapy, and among the patients who did receive second-line therapy, there was significant heterogeneity in the therapy. The development of maintenance therapy has raised issues about the role of treatment-free intervals in routine clinical care, trial design issues such as the optimal endpoint, the ethics of a placebo arm, and the implications of maintenance therapy for first-line trials.

  9. Long-Term Weight Maintenance after a 17-Week Weight Loss Intervention with or without a One-Year Maintenance Program: A Randomized Controlled Trial

    Directory of Open Access Journals (Sweden)

    Tuula Pekkarinen

    2015-01-01

    Full Text Available Background. Weight lost by obese patients is almost always regained over time. Extended treatment may improve maintenance, but solid evidence is lacking. Purpose. We determined effectiveness of maintenance therapy after a weight loss program. Methods. Together 201 patients (mean age 47 years and BMI 42 kg/m2, 71% women were randomly assigned to either a 17-week weight loss program followed by a one-year maintenance program or to a weight loss program without subsequent maintenance intervention. The weight loss program included behavior modification and a very-low-calorie diet, and maintenance program behavior modification. The primary outcome measure was percentage of patients with 5% or more weight loss at the end of maintenance (week 69 and one year later (week 121. Secondary outcomes were weight related changes in lifestyle and quality of life. Results. At week 69, 52% of the patients with and 44% of those without maintenance program had lost weight ≥5%, P=0.40, and, at week 121, 33% and 34%, P=0.77, respectively. At week 121 secondary outcomes did not differ between the groups among those successfully followed up. Conclusions. This one-year maintenance program was not effective in preventing weight regain in severely obese patients. Trial Registration. This trial is registered under clinicaltrials.gov Identifier: NCT00590655.

  10. Recent Changes to ABR Maintenance of Certification Part 4 (PQI): Acknowledgment of Radiologists' Activities to Improve Quality and Safety.

    Science.gov (United States)

    Donnelly, Lane F; Mathews, Vincent P; Laszakovits, David J; Jackson, Valerie P; Guiberteau, Milton J

    2016-02-01

    The ABR has recently reviewed and revised its policy establishing how ABR diplomates may comply with requirements for Maintenance of Certification Part 4: Practice Quality Improvement (PQI). The changes were deemed necessary by the Board of Trustees to acknowledge and credit the numerous ways in which radiology professionals contribute to improving patient care through existing and evolving activities available to them within the radiology community. In addition to meeting requirements by completing a traditional PQI project, the policy revision now allows diplomates to meet criteria by completing one of a number of activities in an expanded spectrum of PQI options recognized by the ABR. The new policy also acknowledges the maturing state of quality improvement science by permitting PQI projects to use "any standard quality improvement methodology," such as Six Sigma, Lean, the Institute for Healthcare Improvement's Model for Improvement, and others in addition to the previously prescribed three-phase plan-do-study-act format. Copyright © 2016 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  11. Network maintenance

    CERN Multimedia

    GS Department

    2009-01-01

    A site-wide network maintenance operation has been scheduled for Saturday 28 February. Most of the network devices of the general purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites throughout the day. This upgrade will not affect the Computer Centre itself, Building 613, the Technical Network and the LHC experiments, dedicated networks at the pits. For further details of this intervention, please contact Netops by phone 74927 or e-mail mailto:Netops@cern.ch. IT/CS Group

  12. Network maintenance

    CERN Multimedia

    IT Department

    2009-01-01

    A site wide network maintenance has been scheduled for Saturday 28 February. Most of the network devices of the General Purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites along this day. This upgrade will not affect: the Computer centre itself, building 613, the Technical Network and the LHC experiments dedicated networks at the pits. Should you need more details on this intervention, please contact Netops by phone 74927 or email mailto:Netops@cern.ch. IT/CS Group

  13. Optimization of radiation protection of cell maintenance of radiopharmaceutical production

    International Nuclear Information System (INIS)

    Machado, Jessica S.; Gerulis, Eduardo; Todo, Alberto S.; Rodrigues Junior, Orlando

    2011-01-01

    This paper performs a study of maintenance tasks realized in production cells to suggest improvements related to the occupational doses based on the optimization principle of the radioprotection. A data survey has been realized of the doses received by the workers during the maintenance. The average values of effective doses are lower than the limits established in the regulations, however can be optimized

  14. Preliminary conceptual design of inspection and maintenance for KALIMER reactor system

    Energy Technology Data Exchange (ETDEWEB)

    Joo, Young Sang; Kim, Seok Hun; Yoo, Bong

    2000-08-01

    In-service inspection and maintenance are very important for improving the safety and availability of nuclear power plants. The conceptual requirements of in-service inspection and maintenance should be reflected in the earlier design process for the verification of the plant operability and reliability. In this report the fundamental approaches of the inspection and maintenance for KALIMER are established to ensure the structural integrity and operability for KALIMER. The general strategy and methodology of maintenance and inspection for the reactor system and components are proposed and described for satisfying the intents of the section XI, division 3, of ASME code and considering the design characteristics of KALIMER.

  15. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  16. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  17. Effect of tailored educational intervention to improve self-care maintenance and quality of life in postmenopausal osteoporotic women after a fragility fracture: the Guardian Angel® study.

    Science.gov (United States)

    Basilici Zannetti, Emanuela; D'Agostino, Fabio; Cittadini, Noemi; Feola, Maurizio; Pennini, Annalisa; Rao, Cecilia; Vellone, Ercole; Tarantino, Umberto; Alvaro, Rosaria

    2017-01-01

    Osteoporosis has a significant impact on affected patients. Healthcare providers should encourage postmenopausal women to improve self-care maintenance behaviors and quality of life following a fragility fracture. The aims of this study were to a) develop two new instruments for measuring, respectively, self-care maintenance and quality of life, in postmenopausal women with osteoporosis; b) evaluate the effectiveness of a tailored educational intervention to improve self-care maintenance and quality of life after a fragility fracture in postmenopausal women. For the first aim, a cross-sectional study will be performed; for the second aim, a multicenter, quasi-experimental, interventional design will be used. A convenience sample of postmenopausal women admitted to 44 hospitals in Italy with a diagnosis of bone fragility fracture will be enrolled and surveyed at 7, 30, 60 and 180 days after discharge. Trained nurses will conduct the educational intervention. The new instruments will allow the measurement of self-care and quality of life in postmenopausal women following a fragility fracture. Through tailored educational interventions, women can be helped to take their medications correctly, adopt a healthy lifestyle, reduce the occurrence of bone fractures, and have a better quality of life.

  18. A CMMS Expert using BIM for IBS Building Maintenance

    Directory of Open Access Journals (Sweden)

    Hamzah Noraini

    2016-01-01

    Full Text Available In the IBS building maintenance, the conventional methods to the project delivery and its failure to form effective communication channel between complementary knowledge on IBS construction and related members that is conducted in the sequential manner has resulted in ineffectiveness for managing building maintenance, where a paradigm shift within the IBS traditional approach is necessary. The research results described are concerned with i an integrated system to record, diagnose and analyse information for IBS building maintenance to detect patent or latent defect, select an effective repair method, provide appropriate planning decision and reduce risks of defect throughout the building lifetime. ii building a decision making support in diagnosis in IBS building maintenance based on robust data collection about concrete defects and causes including in the selection of a durable replacement design and material or the proper rehabilitation method. The system development was based on analysis of number of interviews and case studies conducted with professional engineers working in IBS building maintenance departments. The paper concludes that implementing a CMMS Expert using BIM can help improve the performance of IBS building design, construction and maintenance operations.

  19. Analysis and forecast of maintenance in power plants; Instandhaltungsanalyse und -prognose fuer Grosskraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Kittan, Thomas [Vattenfall Europe Generation AG, Spremberg (Germany). Standort Technischer Service; Herold, Matthias [TUEV SUED Industrie Service GmbH, Chemnitz (Germany); Baumann, Carsten [TUEV SUED Industrie Service GmbH, Dresden (Germany)

    2011-07-01

    A comprehensive assessment of the 'Schwarze Pumpe' power station has given insights into the effectiveness of maintenance measures and facilitated the budgeting of future maintenance for four additional power station units. Vattenfall commissioned experts from TUeV SUeD Industrie Service to carry out third-party analysis of its maintenance measures and forecast future maintenance budgets. The aim was to obtain a valid data set enabling the detailed assessment of past and future activities and pointing out potentials for improvement. (orig.)

  20. The Design of Management Practices To Improve the Physical Plant Maintenance of Southwest Texas Junior College.

    Science.gov (United States)

    Box, Wilford Winston

    A study was conducted of the physical plant maintenance department (PPMD) of Southwest Texas Junior College (SWTJC), in order to determine if the department was structured as a functional organization, if maintenance control procedures were in place, and if efficient management practices were being used. Consultations with the director of the PPMD…

  1. On reliability and maintenance modelling of ageing equipment in electric power systems

    International Nuclear Information System (INIS)

    Lindquist, Tommie

    2008-04-01

    Maintenance optimisation is essential to achieve cost-efficiency, availability and reliability of supply in electric power systems. The process of maintenance optimisation requires information about the costs of preventive and corrective maintenance, as well as the costs of failures borne by both electricity suppliers and customers. To calculate expected costs, information is needed about equipment reliability characteristics and the way in which maintenance affects equipment reliability. The aim of this Ph.D. work has been to develop equipment reliability models taking the effect of maintenance into account. The research has focussed on the interrelated areas of condition estimation, reliability modelling and maintenance modelling, which have been investigated in a number of case studies. In the area of condition estimation two methods to quantitatively estimate the condition of disconnector contacts have been developed, which utilise results from infrared thermography inspections and contact resistance measurements. The accuracy of these methods were investigated in two case studies. Reliability models have been developed and implemented for SF6 circuit-breakers, disconnector contacts and XLPE cables in three separate case studies. These models were formulated using both empirical and physical modelling approaches. To improve confidence in such models a Bayesian statistical method incorporating information from the equipment design process was also developed. This method was illustrated in a case study of SF6 circuit-breaker operating rods. Methods for quantifying the effect of maintenance on equipment condition and reliability have been investigated in case studies on disconnector contacts and SF6 circuit-breakers. The input required by these methods are condition measurements and historical failure and maintenance data, respectively. This research has demonstrated that the effect of maintenance on power system equipment may be quantified using available data

  2. Maintenance and management of refills NPP Cofrentes

    International Nuclear Information System (INIS)

    Salar, J.; Blanquer, N.

    2014-01-01

    Maintenance in a nuclear power plant is a discipline that requires considering multiple criteria. Many risks can be involved during the jobs execution, and the preparation of activities needs an important knowledge and experience. During outages, many pieces of equipment are reviewed and inspected, and there is a huge increase of the number of risks and variables needed to perform and adequate preparation, coordination and execution of the maintenance activities. Cofrentes Nuclear Power Plant has improved the Outage preparation organization, in order to get more people involved, and make sure that all the critical parameters have been considered for each outage work. (Author)

  3. Research on Application of FMECA in Missile Equipment Maintenance Decision

    Science.gov (United States)

    Kun, Wang

    2018-03-01

    Fault mode effects and criticality analysis (FMECA) is a method widely used in engineering. Studying the application of FMEA technology in military equipment maintenance decision-making, can help us build a better equipment maintenance support system, and increase the using efficiency of weapons and equipment. Through Failure Modes, Effects and Criticality Analysis (FMECA) of equipment, known and potential failure modes and their causes are found out, and the influence on the equipment performance, operation success, personnel security are determined. Furthermore, according to the synthetical effects of the severity of effects and the failure probability, possible measures for prevention and correction are put forward. Through replacing or adjusting the corresponding parts, corresponding maintenance strategy is decided for preventive maintenance of equipment, which helps improve the equipment reliability.

  4. With a re-engineering of maintenance to a profitably oriented maintenance

    International Nuclear Information System (INIS)

    Angelevska, Silvana; Jolevski, Tome

    2000-01-01

    This paper presents an overview of effectiveness of the profit centered maintenance as a contemporary way of the maintenance management concept. Such redesign of a maintenance procedure results in significant gains in cost reduction and increase of the profitability and competitiveness of energy. The business process re engineering - a modern management control theory that is important aspect of the profit centered maintenance is summarized

  5. Assessing maintenance contracts when preventive maintenance is outsourced

    International Nuclear Information System (INIS)

    Wu Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.

  6. Routine check and annual maintenance for industrial radiography gamma projector

    International Nuclear Information System (INIS)

    Shaharudin Sayuti; Abdul Nassir Ibrahim; Sukhri Ahmad; Arshad Yassin; Mohd Junaidi Jaapar; Khairul Anuar Mohd Salleh; Abdul Razak Hamzah

    2009-04-01

    The main objective of this paper is to share some experience pertaining to gamma projector maintenance programme. In Malaysia there are more than 100 gamma projectors, which need to be maintenance annually. Most of these projectors are Tech-Ops 660 series portable gamma radiography systems, which are used primarily for industrial radiography. The portability feature of the system provides both a safe means of transporting the radioactive source and operating flexibility, particularly useful in areas where access is limited. Generally, the national authorised service centre carries out the annual inspection of this system. In Malaysia, Malaysian Nuclear Agency has been recognised as the National Gamma Projector Maintenance Centre by the Atomic Energy Licensing Board (AELB). In this paper, a brief review of the design and operation is included in the discussion of the maintenance procedure, limitations and improvements of the gamma projector maintenance programme. (author)

  7. Improved extraction procedure for carotenoids from human milk.

    Science.gov (United States)

    Schweigert, F J; Hurtienne, A; Bathe, K

    2000-05-01

    An improved method for the extraction of the major carotenoids from human milk is described. Carotenoids were extracted from milk first with ethanol and n-hexane. Then, polar xanthophylls were extracted from n-hexane into ethanol/water. The remaining n-hexane was evaporated, the residue combined with the ethanolic milk fraction and the mixture briefly saponified. Carotenoids were extracted from the hydrolysate with n-hexane, combined with the polar xanthophylls from the non-saponified ethanol/water-extract and separated by HPLC. Using this method we were able to significantly improve the recovery of xanthophylls such as lutein and zeaxanthin from human milk. The recovery rate of all carotenoids was > 90%. This method might not only be of value for milk but should be especially useful in the extraction of carotenoids from human tissues such as the adipose tissue.

  8. Risk-Based Predictive Maintenance for Safety-Critical Systems by Using Probabilistic Inference

    Directory of Open Access Journals (Sweden)

    Tianhua Xu

    2013-01-01

    Full Text Available Risk-based maintenance (RBM aims to improve maintenance planning and decision making by reducing the probability and consequences of failure of equipment. A new predictive maintenance strategy that integrates dynamic evolution model and risk assessment is proposed which can be used to calculate the optimal maintenance time with minimal cost and safety constraints. The dynamic evolution model provides qualified risks by using probabilistic inference with bucket elimination and gives the prospective degradation trend of a complex system. Based on the degradation trend, an optimal maintenance time can be determined by minimizing the expected maintenance cost per time unit. The effectiveness of the proposed method is validated and demonstrated by a collision accident of high-speed trains with obstacles in the presence of safety and cost constrains.

  9. Improvement of availability of PWR nuclear plants through the reduction of the time required for refueling/maintenance outages

    International Nuclear Information System (INIS)

    Mayers, J.B.; Soth, L.G.

    1978-04-01

    The objective of the project, conducted by Commonwealth Research Corporation and Westinghouse Electric Corporation, is to identify improvements in procedures and equipment which will reduce the time required for refueling/maintenance outages at PWR nuclear power plants. The outage of Commonwealth Edison Zion Station Unit 1 in March through May of 1976 was evaluated to identify those items which caused delays and those work activities that offer the potential for significant improvements that could reduce the overall duration of the outage and achieve an improvement in the plant's availability for power production. Modifications in procedures have been developed and were evaluated during one or more outages in 1977. Conceptual designs have been developed for equipment modifications to the refueling system that could reduce the time required for the refueling portion of the outage. The purpose of the interim report is to describe those conceptual designs and to assess their impact upon future outages. Recommendations are included for the implementation of these equipment improvements in a continuation of this program as a demonstration of plant availability benefits that can be realized in PWR nuclear plants already in operation or under construction

  10. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  11. AIRCRAFT MAINTENANCE HANGAR

    Directory of Open Access Journals (Sweden)

    GEAMBASU Gabriel George

    2017-05-01

    Full Text Available The paper presents the maintenance process that is done on an airplane, at a certain period of time, or after a number of flight hours or cycles and describes the checks performed behind each inspection. The first part of research describes the aircraft maintenance process that has to be done after an updated maintenance manual according with aircraft type, followed by a short introduction about maintenance hangar. The second part of the paper presents a hangar design with a foldable roof and walls, which can be folded or extended, over an airplane when a maintenance process is done, or depending on weather condition.

  12. The plant operating procedure information modeling system for creation and maintenance of procedures

    International Nuclear Information System (INIS)

    Fanto, S.V.; Petras, D.S.; Reiner, R.T.; Frost, D.R.; Orendi, R.G.

    1990-01-01

    This paper reports that as a result of the accident at Three Mile Island, regulatory requirements were issued to upgrade Emergency Operating Procedures for nuclear power plants. The use of human-factored, function-oriented, EOPs were mandated to improve human reliability and to mitigate the consequences of a broad range of initiating events, subsequent failures and operator errors, without having to first diagnose the specific events. The Westinghouse Owners Group responded by developing the Emergency Response Guidelines in a human-factored, two-column format to aid in the transfer of the improved technical information to the operator during transients and accidents. The ERGs are a network of 43 interrelated guidelines which specify operator actions to be taken during plant emergencies to restore the plant to a safe and stable condition. Each utility then translates these guidelines into plant specific EOPs. The creation and maintenance of this large web of interconnecting ERGs/EOPs is an extremely complex task. This paper reports that in order to aid procedure documentation specialists with this time-consuming and tedious task, the Plant Operating Procedure Information Modeling system was developed to provide a controlled and consistent means to build and maintain the ERGs/EOPs and their supporting documentation

  13. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  14. Quality Control Activities Related to Mechanical Maintenance of Safety Related Components at Krsko NPP

    International Nuclear Information System (INIS)

    Djakovic, D.

    2016-01-01

    For successful, safe and reliable operation of nuclear power plant, maintenance processes have to be systematically controlled and procedures for quality control of maintenance activities shall be established. This is requested by the quality assurance program, which shall provide control over activities affecting the quality of structures, systems, and components, considering their importance to safety. As a part of Quality and Nuclear Oversight Division (QNOD; SKV), the Quality Control Department (QC) provides quality control activities, which are deeply involved in maintenance processes at Krsko NPP, both on safety related and non-safety related (non-nuclear safety) components. QC activities on safety related components have to fulfil all requirements, which will enable the components to perform their intended safety functions. This paper describes quality control activities related to mechanical maintenance of safety related components at Krsko NPP and significant role of the Krsko plant QC Department in three particular maintenance cases connected with safety related components. In these three specific cases, the QC has confirmed its importance in compliance with quality assurance program and presented its significant added value in providing safe and reliable operation of the plant. The first maintenance activity was installation of nozzle check valves in the scope of a modification for improving regulation of spent fuel pit pumps. The QC Department performed receipt inspection of the valves. Using non-destructive examination methods and X-ray spectrometry, it was found out that the valve diffuser was made of improper material, which could cause progressive corrosion of the valve diffuser in borated water and consequently a loss of safety function of the valves followed by long-term consequences. The second one was the receipt inspection of containment ventilation fan coolers. The coolers were claimed and sent back to the supplier because the QC Department

  15. Reliability Centered Maintenance as a tool for plant life extension

    International Nuclear Information System (INIS)

    Elliott, J.O.; Mulay, J.N.; Nakahara, Y.

    1991-01-01

    Currently in the nuclear industry there is a growing interest in lowering the cost and complexity of maintenance activities while at the same time improving plant reliability and safety in an effort to prepare for the technical and regulatory challenges of life extension. This seemingly difficult task is being aided by the introduction of a maintenance philosophy developed originally by the airline industry and subsequently applied with great success both in that industry and the U.S. military services. Reliability Centered Maintenance (RCM), in its basic form, may be described as a consideration of reliability and maintenance problems from a systems level approach, allowing a focus on preservation of system function as the aim of a maintenance program optimized for both safety and economics. It is this systematic view of plant maintenance, with the emphasis on overall functions rather than individual parts and components which sets RCM apart from past nuclear plant maintenance philosophies. It is also the factor which makes application of RCM an ideal first step in development of strategies for life extension, both for aging plants, and for plants just beginning their first license term. (J.P.N.)

  16. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  17. A Grounded Theory Study of Aircraft Maintenance Technician Decision-Making

    Science.gov (United States)

    Norcross, Robert

    Aircraft maintenance technician decision-making and actions have resulted in aircraft system errors causing aircraft incidents and accidents. Aircraft accident investigators and researchers examined the factors that influence aircraft maintenance technician errors and categorized the types of errors in an attempt to prevent similar occurrences. New aircraft technology introduced to improve aviation safety and efficiency incur failures that have no information contained in the aircraft maintenance manuals. According to the Federal Aviation Administration, aircraft maintenance technicians must use only approved aircraft maintenance documents to repair, modify, and service aircraft. This qualitative research used a grounded theory approach to explore the decision-making processes and actions taken by aircraft maintenance technicians when confronted with an aircraft problem not contained in the aircraft maintenance manuals. The target population for the research was Federal Aviation Administration licensed aircraft and power plant mechanics from across the United States. Nonprobability purposeful sampling was used to obtain aircraft maintenance technicians with the experience sought in the study problem. The sample population recruitment yielded 19 participants for eight focus group sessions to obtain opinions, perceptions, and experiences related to the study problem. All data collected was entered into the Atlas ti qualitative analysis software. The emergence of Aircraft Maintenance Technician decision-making themes regarding Aircraft Maintenance Manual content, Aircraft Maintenance Technician experience, and legal implications of not following Aircraft Maintenance Manuals surfaced. Conclusions from this study suggest Aircraft Maintenance Technician decision-making were influenced by experience, gaps in the Aircraft Maintenance Manuals, reliance on others, realizing the impact of decisions concerning aircraft airworthiness, management pressures, and legal concerns

  18. Burkholderia thailandensis: Growth and Laboratory Maintenance.

    Science.gov (United States)

    Garcia, Erin C; Cotter, Peggy A

    2016-08-12

    Burkholderia thailandensis is a nonpathogenic Gram-negative bacterium found in tropical soils. Closely related to several human pathogens, its ease of genetic manipulation, rapid growth in the laboratory, and low virulence make B. thailandensis a commonly used model organism. This unit describes the fundamental protocols for in vitro growth and maintenance of B. thailandensis in the laboratory. © 2016 by John Wiley & Sons, Inc. Copyright © 2016 John Wiley & Sons, Inc.

  19. The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways

    Directory of Open Access Journals (Sweden)

    Tetria Yunik Dewi Pamungkas

    2017-01-01

    Full Text Available It is believed that there is merit in researching how the management of track maintenance is organized in the United Kingdom, in particular by Network Rail, and then evaluating how this can be applied to the benefit of Indonesian Railways. The purpose of this research was expected to provide recommendations for management improvement of track maintenance by researching the track maintenance management system in Network Rail. This research study is based on secondary data. The analysis was conducted by using comparison method which compares the British Railways management and Indonesia railway management related to track maintenance management. The track maintenance management system was studied by using Network Rail. The results were compared with track maintenance management system in Indonesia. The comparison will provide the data differences that evaluated so the problem can be identified. The final result of this analysis was the identification of problems and improvisation that can be done for the development of track maintenance management in Indonesia. Several management issues have been mapped to several groups: finance management, structure organization, and asset management. From the problems that have been mapped, some improvements are recommended as monopolist authority restriction, maintenance system contract extension, re-structuring organization hierarchy, business plan consideration, track monitoring strategy arrangement, and condition based maintenance strategy adoption.

  20. METHODOLOGICAL FUNDAMENTALS OF DETERMINATION OF UNPOWERED ROLLING STOCK MAINTENANCE CHARACTERISTICS

    Directory of Open Access Journals (Sweden)

    L. A. Muradian

    2016-02-01

    Full Text Available Purpose. The paper involves: 1 confirmation of the technical characteristics of cars and their modifications, as well as indicators of unfailing work probability during the time between overhauls or service hours; 2 improving the methodological approaches to assess the maintenance characteristics of new and modernized equipment of rail transport on the example of not self-propelled rolling stock, namely, railway freight cars; 3 solution of scientific and applied problems in assessment the maintenance characteristics of the new and modernized railway equipment. Methodology. The basic methodological approaches to the assessment of the maintenance characteristics on the example of not self-propelled rolling stock, namely, railway freight cars were considered. The analysis of the reliability of the car, which is considered as a complex mechanical system, where all system elements are connected in series, wherein each element includes m is serially connected parts. The failure of each part of the calculation will result in refusal of the car. Thus, the car is a system without redundancy. Findings. The evaluation technic of the maintenance characteristics of freight cars in controlled operation with taking into account the features of the new generation of cars was improved. Specified: the duration of the tests, the frequency of inspection of the control group of cars controlled by the parameters of the car, the reasons for the early termination of controlled operation. Identified failures in the process of controlled operation are divided according to their nature. Originality. The authors proposed a method of assessing the maintenance characteristics of railway equipment in trial operation as an example of a new generation of freight cars. Practical value. The results allow assessing the maintenance characteristics of new and modernized rail transport equipment during the maintenance test.