WorldWideScience

Sample records for magnitude cost estimate

  1. IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case).

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M.; Prescott, Ryan; Dawson, Jericah M.; Huelskamp, Robert M.

    2014-11-01

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, based on leveraging a fully funded, Sandia executed NDC Modernization project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

  2. Rough order of magnitude cost estimate for immobilization of 50MT of plutonium using new facilities at the Savannah River site: alternative 12A

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons of plutonium using ceramic in a new facility at Savannah River Site (SRS)

  3. Rough order of magnitude cost estimate for immobilization of 50 MT of plutonium using existing facilities at the Savannah River site: alternative 12B

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons of plutonium using ceramic in an existing facility (221-F) at an Savannah River Site (SRS)

  4. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at Hanford: alternatives 4A/8/10

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium as a ceramic in an existing facility, the Fuels and Materials Examination Facility (FMEF), at Hanford

  5. Rough order of magnitude cost estimate for immobilization of 50 MT of plutonium using existing facilities at Hanford: alternative 11B

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF)

  6. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium sharing existing facilities at Hanford with MOX fuel fabrication facility: alternative 4B

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF). The MOX Fuel Fabrication Facility (MFFF), which is being costed in a separate report, will also be located in the FMEF in this co-location option

  7. Rough order of magnitude cost estimate for immobilization of 50 MT of plutonium sharing existing facilities at Hanford with pit disassembly and conversion facility: alternative 11

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF). The Pit Disassembly and Conversion Facility (PDCF), which is being costed in a separate report by LANL, will also be located in the FMEF in this co-location option

  8. Magnitude Estimation for Large Earthquakes from Borehole Recordings

    Science.gov (United States)

    Eshaghi, A.; Tiampo, K. F.; Ghofrani, H.; Atkinson, G.

    2012-12-01

    We present a simple and fast method for magnitude determination technique for earthquake and tsunami early warning systems based on strong ground motion prediction equations (GMPEs) in Japan. This method incorporates borehole strong motion records provided by the Kiban Kyoshin network (KiK-net) stations. We analyzed strong ground motion data from large magnitude earthquakes (5.0 ≤ M ≤ 8.1) with focal depths < 50 km and epicentral distances of up to 400 km from 1996 to 2010. Using both peak ground acceleration (PGA) and peak ground velocity (PGV) we derived GMPEs in Japan. These GMPEs are used as the basis for regional magnitude determination. Predicted magnitudes from PGA values (Mpga) and predicted magnitudes from PGV values (Mpgv) were defined. Mpga and Mpgv strongly correlate with the moment magnitude of the event, provided sufficient records for each event are available. The results show that Mpgv has a smaller standard deviation in comparison to Mpga when compared with the estimated magnitudes and provides a more accurate early assessment of earthquake magnitude. We test this new method to estimate the magnitude of the 2011 Tohoku earthquake and we present the results of this estimation. PGA and PGV from borehole recordings allow us to estimate the magnitude of this event 156 s and 105 s after the earthquake onset, respectively. We demonstrate that the incorporation of borehole strong ground-motion records immediately available after the occurrence of large earthquakes significantly increases the accuracy of earthquake magnitude estimation and the associated improvement in earthquake and tsunami early warning systems performance. Moment magnitude versus predicted magnitude (Mpga and Mpgv).

  9. Cost function estimation

    DEFF Research Database (Denmark)

    Andersen, C K; Andersen, K; Kragh-Sørensen, P

    2000-01-01

    on these criteria, a two-part model was chosen. In this model, the probability of incurring any costs was estimated using a logistic regression, while the level of the costs was estimated in the second part of the model. The choice of model had a substantial impact on the predicted health care costs, e...

  10. Rapid Moment Magnitude Estimation Using Strong Motion Derived Static Displacements

    OpenAIRE

    Muzli, Muzli; Asch, Guenter; Saul, Joachim; Murjaya, Jaya

    2015-01-01

    The static surface deformation can be recovered from strong motion records. Compared to satellite-based measurements such as GPS or InSAR, the advantage of strong motion records is that they have the potential to provide real-time coseismic static displacements. The use of these valuable data was optimized for the moment magnitude estimation. A centroid grid search method was introduced to calculate the moment magnitude by using1 model. The method to data sets was applied of the 2011...

  11. The Psychology of Cost Estimating

    Science.gov (United States)

    Price, Andy

    2016-01-01

    Cost estimation for large (and even not so large) government programs is a challenge. The number and magnitude of cost overruns associated with large Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) programs highlight the difficulties in developing and promulgating accurate cost estimates. These overruns can be the result of inadequate technology readiness or requirements definition, the whims of politicians or government bureaucrats, or even as failures of the cost estimating profession itself. However, there may be another reason for cost overruns that is right in front of us, but only recently have we begun to grasp it: the fact that cost estimators and their customers are human. The last 70+ years of research into human psychology and behavioral economics have yielded amazing findings into how we humans process and use information to make judgments and decisions. What these scientists have uncovered is surprising: humans are often irrational and illogical beings, making decisions based on factors such as emotion and perception, rather than facts and data. These built-in biases to our thinking directly affect how we develop our cost estimates and how those cost estimates are used. We cost estimators can use this knowledge of biases to improve our cost estimates and also to improve how we communicate and work with our customers. By understanding how our customers think, and more importantly, why they think the way they do, we can have more productive relationships and greater influence. By using psychology to our advantage, we can more effectively help the decision maker and our organizations make fact-based decisions.

  12. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using new facilities at the Savannah River site: alternatives 3A/5A/6A/6B/7A/9A

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium using ceramic in a new facility at Savannah River Site (SRS)

  13. Estimation of the Magnitude of Excavation Damaged Zone at KURT

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Won Jin; Kim, Jin Sub; Lee, Changsoo; Cho, Heui Joo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    In the EDZ, the permeability of the rock increases. The annular EDZ surrounding the tunnel may act as a continuous and high-permeable pathway for the groundwater flow, which accelerates the intrusion of groundwater into the repository and increases the release of radionuclide into the biosphere from the repository. Therefore an investigation on the magnitude of the EDZ has been important from the viewpoint of mechanical stability and radiological safety for a geological repository. In this study, two in-situ measurements were performed at the KURT (KAERI Underground Research Tunnel) to investigate the magnitude of the EDZ. The magnitude of EDZ was estimated to be 0.6 to 1.8 m from the tunnel wall on the basis of the deformation modulus, and the value of deformation modulus in the EDZ is about 40% of those in undisturbed zone. The magnitude of EDZ can be estimated to be about 2 m from the viewpoint of permeability, and the permeabilities in the EDZ seem to be increased at up to 2 orders of magnitude compared with those in the intact rock. The magnitude of EDZ estimated based on the permeability is larger than that from the Goodman jack test.

  14. Sequential sampling, magnitude estimation, and the wisdom of crowds

    DEFF Research Database (Denmark)

    Nash, Ulrik W.

    2017-01-01

    in the wisdom of crowds indicated by judgment distribution skewness. The present study reports findings from an experiment on magnitude estimation and supports these predictions. The study moreover demonstrates that systematic errors by groups of people can be corrected using information about the judgment...

  15. Estimating the magnitude of food waste generated in South Africa

    CSIR Research Space (South Africa)

    Oelofse, Suzanna HH

    2012-08-01

    Full Text Available Throughout the developed world, food is treated as a disposable commodity. Between one third and half of all food produced for human consumption globally is estimated to be wasted. However, attempts to quantify the actual magnitude of food wasted...

  16. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.

    1992-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  17. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.; Heemstra, F.J.

    1993-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  18. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at the Savannah River site: alternatives 3B/5B/6C/6D/7B/9B

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium using ceramic in an existing facility (221-F) at Savannah River Site (SRS)

  19. Structural Estimation of Stock Market Participation Costs

    DEFF Research Database (Denmark)

    Khorunzhina, Natalia

    2013-01-01

    education programs can affect consumers' investment decisions. Using household data from the Panel Study of Income Dynamics, I estimate the magnitude of the participation cost, allowing for individual heterogeneity in it. The results show the average stock market participation cost is about 4–6% of labor...

  20. Cost estimating for CERCLA remedial alternatives a unit cost methodology

    International Nuclear Information System (INIS)

    Brettin, R.W.; Carr, D.J.; Janke, R.J.

    1995-06-01

    The United States Environmental Protection Agency (EPA) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA, Interim Final, dated October 1988 (EPA 1988) requires a detailed analysis be conducted of the most promising remedial alternatives against several evaluation criteria, including cost. To complete the detailed analysis, order-of-magnitude cost estimates (having an accuracy of +50 percent to -30 percent) must be developed for each remedial alternative. This paper presents a methodology for developing cost estimates of remedial alternatives comprised of various technology and process options with a wide range of estimated contaminated media quantities. In addition, the cost estimating methodology provides flexibility for incorporating revisions to remedial alternatives and achieves the desired range of accuracy. It is important to note that the cost estimating methodology presented here was developed as a concurrent path to the development of contaminated media quantity estimates. This methodology can be initiated before contaminated media quantities are estimated. As a result, this methodology is useful in developing cost estimates for use in screening and evaluating remedial technologies and process options. However, remedial alternative cost estimates cannot be prepared without the contaminated media quantity estimates. In the conduct of the feasibility study for Operable Unit 5 at the Fernald Environmental Management Project (FEMP), fourteen remedial alternatives were retained for detailed analysis. Each remedial alternative was composed of combinations of remedial technologies and processes which were earlier determined to be best suited for addressing the media-specific contaminants found at the FEMP site, and achieving desired remedial action objectives

  1. Approaches to estimating decommissioning costs

    International Nuclear Information System (INIS)

    Smith, R.I.

    1990-07-01

    The chronological development of methodology for estimating the cost of nuclear reactor power station decommissioning is traced from the mid-1970s through 1990. Three techniques for developing decommissioning cost estimates are described. The two viable techniques are compared by examining estimates developed for the same nuclear power station using both methods. The comparison shows that the differences between the estimates are due largely to differing assumptions regarding the size of the utility and operating contractor overhead staffs. It is concluded that the two methods provide bounding estimates on a range of manageable costs, and provide reasonable bases for the utility rate adjustments necessary to pay for future decommissioning costs. 6 refs

  2. An Analytical Cost Estimation Procedure

    National Research Council Canada - National Science Library

    Jayachandran, Toke

    1999-01-01

    Analytical procedures that can be used to do a sensitivity analysis of a cost estimate, and to perform tradeoffs to identify input values that can reduce the total cost of a project, are described in the report...

  3. Passive seismic monitoring at the ketzin CCS site -Magnitude estimation

    NARCIS (Netherlands)

    Paap, B.F.; Steeghs, T.P.H.

    2014-01-01

    In order to allow quantification of the strength of local micro-seismic events recorded at the CCS pilot site in Ketzin in terms of local magnitude, earthquake data recorded by standardized seismometers were used. Earthquakes were selected that occurred in Poland and Czech Republic and that were

  4. Sinusoidal Parameter Estimation Using Quadratic Interpolation around Power-Scaled Magnitude Spectrum Peaks

    Directory of Open Access Journals (Sweden)

    Kurt James Werner

    2016-10-01

    Full Text Available The magnitude of the Discrete Fourier Transform (DFT of a discrete-time signal has a limited frequency definition. Quadratic interpolation over the three DFT samples surrounding magnitude peaks improves the estimation of parameters (frequency and amplitude of resolved sinusoids beyond that limit. Interpolating on a rescaled magnitude spectrum using a logarithmic scale has been shown to improve those estimates. In this article, we show how to heuristically tune a power scaling parameter to outperform linear and logarithmic scaling at an equivalent computational cost. Although this power scaling factor is computed heuristically rather than analytically, it is shown to depend in a structured way on window parameters. Invariance properties of this family of estimators are studied and the existence of a bias due to noise is shown. Comparing to two state-of-the-art estimators, we show that an optimized power scaling has a lower systematic bias and lower mean-squared-error in noisy conditions for ten out of twelve common windowing functions.

  5. Collider Scaling and Cost Estimation

    International Nuclear Information System (INIS)

    Palmer, R.B.

    1986-01-01

    This paper deals with collider cost and scaling. The main points of the discussion are the following ones: 1) scaling laws and cost estimation: accelerating gradient requirements, total stored RF energy considerations, peak power consideration, average power consumption; 2) cost optimization; 3) Bremsstrahlung considerations; 4) Focusing optics: conventional, laser focusing or super disruption. 13 refs

  6. Laser cost experience and estimation

    International Nuclear Information System (INIS)

    Shofner, F.M.; Hoglund, R.L.

    1977-01-01

    This report addresses the question of estimating the capital and operating costs for LIS (Laser Isotope Separation) lasers, which have performance requirements well beyond the state of mature art. This question is seen with different perspectives by political leaders, ERDA administrators, scientists, and engineers concerned with reducing LIS to economically successful commercial practice, on a timely basis. Accordingly, this report attempts to provide ''ballpark'' estimators for capital and operating costs and useful design and operating information for lasers based on mature technology, and their LIS analogs. It is written very basically and is intended to respond about equally to the perspectives of administrators, scientists, and engineers. Its major contributions are establishing the current, mature, industrialized laser track record (including capital and operating cost estimators, reliability, types of application, etc.) and, especially, evolution of generalized estimating procedures for capital and operating cost estimators for new laser design

  7. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  8. Guideline to Estimate Decommissioning Costs

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Kim, Younggook; Oh, Jaeyoung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The primary objective of this work is to provide guidelines to estimate the decommissioning cost as well as the stakeholders with plausible information to understand the decommissioning activities in a reasonable manner, which eventually contribute to acquiring the public acceptance for the nuclear power industry. Although several cases of the decommissioning cost estimate have been made for a few commercial nuclear power plants, the different technical, site-specific and economic assumptions used make it difficult to interpret those cost estimates and compare them with that of a relevant plant. Trustworthy cost estimates are crucial to plan a safe and economic decommissioning project. The typical approach is to break down the decommissioning project into a series of discrete and measurable work activities. Although plant specific differences derived from the economic and technical assumptions make a licensee difficult to estimate reliable decommissioning costs, estimating decommissioning costs is the most crucial processes since it encompasses all the spectrum of activities from the planning to the final evaluation on whether a decommissioning project has successfully been preceded from the perspective of safety and economic points. Hence, it is clear that tenacious efforts should be needed to successfully perform the decommissioning project.

  9. Software Cost-Estimation Model

    Science.gov (United States)

    Tausworthe, R. C.

    1985-01-01

    Software Cost Estimation Model SOFTCOST provides automated resource and schedule model for software development. Combines several cost models found in open literature into one comprehensive set of algorithms. Compensates for nearly fifty implementation factors relative to size of task, inherited baseline, organizational and system environment and difficulty of task.

  10. Missing texture reconstruction method based on error reduction algorithm using Fourier transform magnitude estimation scheme.

    Science.gov (United States)

    Ogawa, Takahiro; Haseyama, Miki

    2013-03-01

    A missing texture reconstruction method based on an error reduction (ER) algorithm, including a novel estimation scheme of Fourier transform magnitudes is presented in this brief. In our method, Fourier transform magnitude is estimated for a target patch including missing areas, and the missing intensities are estimated by retrieving its phase based on the ER algorithm. Specifically, by monitoring errors converged in the ER algorithm, known patches whose Fourier transform magnitudes are similar to that of the target patch are selected from the target image. In the second approach, the Fourier transform magnitude of the target patch is estimated from those of the selected known patches and their corresponding errors. Consequently, by using the ER algorithm, we can estimate both the Fourier transform magnitudes and phases to reconstruct the missing areas.

  11. An evolutionary approach to real-time moment magnitude estimation via inversion of displacement spectra

    Science.gov (United States)

    Caprio, M.; Lancieri, M.; Cua, G. B.; Zollo, A.; Wiemer, S.

    2011-01-01

    We present an evolutionary approach for magnitude estimation for earthquake early warning based on real-time inversion of displacement spectra. The Spectrum Inversion (SI) method estimates magnitude and its uncertainty by inferring the shape of the entire displacement spectral curve based on the part of the spectra constrained by available data. The method consists of two components: 1) estimating seismic moment by finding the low frequency plateau Ω0, the corner frequency fc and attenuation factor (Q) that best fit the observed displacement spectra assuming a Brune ω2 model, and 2) estimating magnitude and its uncertainty based on the estimate of seismic moment. A novel characteristic of this method is that is does not rely on empirically derived relationships, but rather involves direct estimation of quantities related to the moment magnitude. SI magnitude and uncertainty estimates are updated each second following the initial P detection. We tested the SI approach on broadband and strong motion waveforms data from 158 Southern California events, and 25 Japanese events for a combined magnitude range of 3 ≤ M ≤ 7. Based on the performance evaluated on this dataset, the SI approach can potentially provide stable estimates of magnitude within 10 seconds from the initial earthquake detection.

  12. Noise measurement from magnitude MRI using local estimates of variance and skewness

    International Nuclear Information System (INIS)

    Rajan, Jeny; Poot, Dirk; Juntu, Jaber; Sijbers, Jan

    2010-01-01

    In this note, we address the estimation of the noise level in magnitude magnetic resonance (MR) images in the absence of background data. Most of the methods proposed earlier exploit the Rayleigh distributed background region in MR images to estimate the noise level. These methods, however, cannot be used for images where no background information is available. In this note, we propose two different approaches for noise level estimation in the absence of the image background. The first method is based on the local estimation of the noise variance using maximum likelihood estimation and the second method is based on the local estimation of the skewness of the magnitude data distribution. Experimental results on synthetic and real MR image datasets show that the proposed estimators accurately estimate the noise level in a magnitude MR image, even without background data. (note)

  13. Do Indonesian Children's Experiences with Large Currency Units Facilitate Magnitude Estimation of Long Temporal Periods?

    Science.gov (United States)

    Cheek, Kim A.

    2017-08-01

    Ideas about temporal (and spatial) scale impact students' understanding across science disciplines. Learners have difficulty comprehending the long time periods associated with natural processes because they have no referent for the magnitudes involved. When people have a good "feel" for quantity, they estimate cardinal number magnitude linearly. Magnitude estimation errors can be explained by confusion about the structure of the decimal number system, particularly in terms of how powers of ten are related to one another. Indonesian children regularly use large currency units. This study investigated if they estimate long time periods accurately and if they estimate those time periods the same way they estimate analogous currency units. Thirty-nine children from a private International Baccalaureate school estimated temporal magnitudes up to 10,000,000,000 years in a two-part study. Artifacts children created were compared to theoretical model predictions previously used in number magnitude estimation studies as reported by Landy et al. (Cognitive Science 37:775-799, 2013). Over one third estimated the magnitude of time periods up to 10,000,000,000 years linearly, exceeding what would be expected based upon prior research with children this age who lack daily experience with large quantities. About half treated successive powers of ten as a count sequence instead of multiplicatively related when estimating magnitudes of time periods. Children generally estimated the magnitudes of long time periods and familiar, analogous currency units the same way. Implications for ways to improve the teaching and learning of this crosscutting concept/overarching idea are discussed.

  14. Cost Estimates and Investment Decisions

    International Nuclear Information System (INIS)

    Emhjellen, Kjetil; Emhjellen Magne; Osmundsen, Petter

    2001-08-01

    When evaluating new investment projects, oil companies traditionally use the discounted cashflow method. This method requires expected cashflows in the numerator and a risk adjusted required rate of return in the denominator in order to calculate net present value. The capital expenditure (CAPEX) of a project is one of the major cashflows used to calculate net present value. Usually the CAPEX is given by a single cost figure, with some indication of its probability distribution. In the oil industry and many other industries, it is common practice to report a CAPEX that is the estimated 50/50 (median) CAPEX instead of the estimated expected (expected value) CAPEX. In this article we demonstrate how the practice of using a 50/50 (median) CAPEX, when the cost distributions are asymmetric, causes project valuation errors and therefore may lead to wrong investment decisions with acceptance of projects that have negative net present values. (author)

  15. Quasi real-time estimation of the moment magnitude of large earthquake from static strain changes

    Science.gov (United States)

    Itaba, S.

    2016-12-01

    The 2011 Tohoku-Oki (off the Pacific coast of Tohoku) earthquake, of moment magnitude 9.0, was accompanied by large static strain changes (10-7), as measured by borehole strainmeters operated by the Geological Survey of Japan in the Tokai, Kii Peninsula, and Shikoku regions. A fault model for the earthquake on the boundary between the Pacific and North American plates, based on these borehole strainmeter data, yielded a moment magnitude of 8.7. On the other hand, based on the seismic wave, the prompt report of the magnitude which the Japan Meteorological Agency (JMA) announced just after earthquake occurrence was 7.9. Such geodetic moment magnitudes, derived from static strain changes, can be estimated almost as rapidly as determinations using seismic waves. I have to verify the validity of this method in some cases. In the case of this earthquake's largest aftershock, which occurred 29 minutes after the mainshock. The prompt report issued by JMA assigned this aftershock a magnitude of 7.3, whereas the moment magnitude derived from borehole strain data is 7.6, which is much closer to the actual moment magnitude of 7.7. In order to grasp the magnitude of a great earthquake earlier, several methods are now being suggested to reduce the earthquake disasters including tsunami. Our simple method of using static strain changes is one of the strong methods for rapid estimation of the magnitude of large earthquakes, and useful to improve the accuracy of Earthquake Early Warning.

  16. Rapid estimation of the moment magnitude of large earthquake from static strain changes

    Science.gov (United States)

    Itaba, S.

    2014-12-01

    The 2011 off the Pacific coast of Tohoku earthquake, of moment magnitude (Mw) 9.0, occurred on March 11, 2011. Based on the seismic wave, the prompt report of the magnitude which the Japan Meteorological Agency announced just after earthquake occurrence was 7.9, and it was considerably smaller than an actual value. On the other hand, using nine borehole strainmeters of Geological Survey of Japan, AIST, we estimated a fault model with Mw 8.7 for the earthquake on the boundary between the Pacific and North American plates. This model can be estimated about seven minutes after the origin time, and five minute after wave arrival. In order to grasp the magnitude of a great earthquake earlier, several methods are now being suggested to reduce the earthquake disasters including tsunami (e.g., Ohta et al., 2012). Our simple method of using strain steps is one of the strong methods for rapid estimation of the magnitude of great earthquakes.

  17. Cost Estimation and Control for Flight Systems

    Science.gov (United States)

    Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)

    2002-01-01

    Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.

  18. Supplemental report on cost estimates'

    International Nuclear Information System (INIS)

    1992-01-01

    The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis

  19. A General Method to Estimate Earthquake Moment and Magnitude using Regional Phase Amplitudes

    Energy Technology Data Exchange (ETDEWEB)

    Pasyanos, M E

    2009-11-19

    This paper presents a general method of estimating earthquake magnitude using regional phase amplitudes, called regional M{sub o} or regional M{sub w}. Conceptually, this method uses an earthquake source model along with an attenuation model and geometrical spreading which accounts for the propagation to utilize regional phase amplitudes of any phase and frequency. Amplitudes are corrected to yield a source term from which one can estimate the seismic moment. Moment magnitudes can then be reliably determined with sets of observed phase amplitudes rather than predetermined ones, and afterwards averaged to robustly determine this parameter. We first examine in detail several events to demonstrate the methodology. We then look at various ensembles of phases and frequencies, and compare results to existing regional methods. We find regional M{sub o} to be a stable estimator of earthquake size that has several advantages over other methods. Because of its versatility, it is applicable to many more events, particularly smaller events. We make moment estimates for earthquakes ranging from magnitude 2 to as large as 7. Even with diverse input amplitude sources, we find magnitude estimates to be more robust than typical magnitudes and existing regional methods and might be tuned further to improve upon them. The method yields a more meaningful quantity of seismic moment, which can be recast as M{sub w}. Lastly, it is applied here to the Middle East region using an existing calibration model, but it would be easy to transport to any region with suitable attenuation calibration.

  20. Estimating the Costs of Preventive Interventions

    Science.gov (United States)

    Foster, E. Michael; Porter, Michele M.; Ayers, Tim S.; Kaplan, Debra L.; Sandler, Irwin

    2007-01-01

    The goal of this article is to improve the practice and reporting of cost estimates of prevention programs. It reviews the steps in estimating the costs of an intervention and the principles that should guide estimation. The authors then review prior efforts to estimate intervention costs using a sample of well-known but diverse studies. Finally,…

  1. Earthquake magnitude estimation using the τ c and P d method for earthquake early warning systems

    Science.gov (United States)

    Jin, Xing; Zhang, Hongcai; Li, Jun; Wei, Yongxiang; Ma, Qiang

    2013-10-01

    Earthquake early warning (EEW) systems are one of the most effective ways to reduce earthquake disaster. Earthquake magnitude estimation is one of the most important and also the most difficult parts of the entire EEW system. In this paper, based on 142 earthquake events and 253 seismic records that were recorded by the KiK-net in Japan, and aftershocks of the large Wenchuan earthquake in Sichuan, we obtained earthquake magnitude estimation relationships using the τ c and P d methods. The standard variances of magnitude calculation of these two formulas are ±0.65 and ±0.56, respectively. The P d value can also be used to estimate the peak ground motion of velocity, then warning information can be released to the public rapidly, according to the estimation results. In order to insure the stability and reliability of magnitude estimation results, we propose a compatibility test according to the natures of these two parameters. The reliability of the early warning information is significantly improved though this test.

  2. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  3. Order of magnitude cost appraisal for selected aspects of clad waste management

    International Nuclear Information System (INIS)

    Zima, G.E.

    1977-02-01

    A simple formula, incorporating the fixed charge rate principle, is applied to a clad waste management exercise involving densification, canning, transportation and salt disposal. For the purpose of comparison with the bulk of published nuclear waste management costs, cost and fixed charge rate data appropriate to roughly the period 1970 to 1973 are used. Within the context of this order of magnitude appraisal, densification displays some cost advantage, reflected principally in the transportation cost. Dependent on the degree of densification, above a certain clad waste generation rate the transportation savings may be expected to exceed reasonable densification costs. There is no explicit consideration of the decontamination step in this appraisal. The limited accessibility of surface effect decontamination to internal transuranic and activation product contamination suggests a quite small influence of decontamination on the transportation and disposal costs. Decontamination may, however, have a significant effect on the ease of establishing a practicable containment envelope of high reliability throughout the clad waste history. A brief comparison is made of clad waste management costs with the major costs of the nuclear power economy. This comparison implies a virtually unlimited technical latitude for clad waste treatment in accommodating the public safety without significant perturbation of nuclear power costs. It is submitted that clad waste management optimization will be under the primal constraint of maximizing thelong term public safety, with economic analysis useful only as a discriminator between waste handling alternatives of sensibly equivalent containment qualities. Some areas of clad waste treatment meriting increased attention are noted

  4. The Relationship between Spatial and Temporal Magnitude Estimation of Scientific Concepts at Extreme Scales

    Science.gov (United States)

    Price, Aaron; Lee, H.

    2010-01-01

    Many astronomical objects, processes, and events exist and occur at extreme scales of spatial and temporal magnitudes. Our research draws upon the psychological literature, replete with evidence of linguistic and metaphorical links between the spatial and temporal domains, to compare how students estimate spatial and temporal magnitudes associated with objects and processes typically taught in science class.. We administered spatial and temporal scale estimation tests, with many astronomical items, to 417 students enrolled in 12 undergraduate science courses. Results show that while the temporal test was more difficult, students’ overall performance patterns between the two tests were mostly similar. However, asymmetrical correlations between the two tests indicate that students think of the extreme ranges of spatial and temporal scales in different ways, which is likely influenced by their classroom experience. When making incorrect estimations, students tended to underestimate the difference between the everyday scale and the extreme scales on both tests. This suggests the use of a common logarithmic mental number line for both spatial and temporal magnitude estimation. However, there are differences between the two tests in the errors student make in the everyday range. Among the implications discussed is the use of spatio-temporal reference frames, instead of smooth bootstrapping, to help students maneuver between scales of magnitude and the use of logarithmic transformations between reference frames. Implications for astronomy range from learning about spectra to large scale galaxy structure.

  5. Origin of how steam rockets can reduce space transport cost by orders of magnitude

    International Nuclear Information System (INIS)

    Zuppero, A.; Larson, T.K.; Schnitzler, B.G.; Rice, J.W.; Hill, T.J.; Richins, W.D.; Parlier, L.; Werner, J.E.

    1999-01-01

    A brief sketch shows the origin of why and how thermal rocket propulsion has the unique potential to dramatically reduce the cost of space transportation for most inner solar system missions of interest. Orders of magnitude reduction in cost are apparently possible when compared to all processes requiring electrolysis for the production of rocket fuels or propellants and to all electric propulsion systems. An order of magnitude advantage can be attributed to rocket propellant tank factors associated with storing water propellant, compared to cryogenic liquids. An order of magnitude can also be attributed to the simplicity of the extraction and processing of ice on the lunar surface, into an easily stored, non-cryogenic rocket propellant (water). A nuclear heated thermal rocket can deliver thousands of times its mass to Low Earth Orbit from the Lunar surface, providing the equivalent to orders of magnitude drop in launch cost for mass in Earth orbit. Mass includes water ice. These cost reductions depend (exponentially) on the mission delta-v requirements being less than about 6 km/s, or about 3 times the specific velocity of steam rockets (2 km/s, from Isp 200 sec). Such missions include: from the lunar surface to Low Lunar Orbit, (LLO), from LLO to lunar escape, from Low Earth Orbit (LEO) to Geosynchronous Orbit (GEO), from LEO to Earth Escape, from LEO to Mars Transfer Orbit, from LLO to GEO, missions returning payloads from about 10% of the periodic comets using propulsive capture to orbits around Earth itself, and fast, 100 day missions from Lunar Escape to Mars. All the assertions depend entirely and completely on the existence of abundant, nearly pure ice at the permanently dark North and South Poles of the Moon. copyright 1999 American Institute of Physics

  6. The magnitude, share and determinants of unpaid care costs for home-based palliative care service provision in Toronto, Canada.

    Science.gov (United States)

    Chai, Huamin; Guerriere, Denise N; Zagorski, Brandon; Coyte, Peter C

    2014-01-01

    With increasing emphasis on the provision of home-based palliative care in Canada, economic evaluation is warranted, given its tremendous demands on family caregivers. Despite this, very little is known about the economic outcomes associated with home-based unpaid care-giving at the end of life. The aims of this study were to (i) assess the magnitude and share of unpaid care costs in total healthcare costs for home-based palliative care patients, from a societal perspective and (ii) examine the sociodemographic and clinical factors that account for variations in this share. One hundred and sixty-nine caregivers of patients with a malignant neoplasm were interviewed from time of referral to a home-based palliative care programme provided by the Temmy Latner Centre for Palliative Care at Mount Sinai Hospital, Toronto, Canada, until death. Information regarding palliative care resource utilisation and costs, time devoted to care-giving and sociodemographic and clinical characteristics was collected between July 2005 and September 2007. Over the last 12 months of life, the average monthly cost was $14 924 (2011 CDN$) per patient. Unpaid care-giving costs were the largest component - $11 334, accounting for 77% of total palliative care expenses, followed by public costs ($3211; 21%) and out-of-pocket expenditures ($379; 2%). In all cost categories, monthly costs increased exponentially with proximity to death. Seemingly unrelated regression estimation suggested that the share of unpaid care costs of total costs was driven by patients' and caregivers' sociodemographic characteristics. Results suggest that overwhelming the proportion of palliative care costs is unpaid care-giving. This share of costs requires urgent attention to identify interventions aimed at alleviating the heavy financial burden and to ultimately ensure the viability of home-based palliative care in future. © 2013 John Wiley & Sons Ltd.

  7. Food irradiation : estimates of cost of processing

    International Nuclear Information System (INIS)

    Krishnamurthy, K.; Bongirwar, D.R.

    1987-01-01

    For estimating the cost of food irradiation, three factors have to be taken into consideration. These are : (1) capital cost incurred on irradiation device and its installation, (2) recurring or running cost which includes maintenance cost and operational expenditure, and (3) product specific cost dependent on the factors specific to the food item to be processed, its storage, handling and distribution. A simple method is proposed to provide estimates of capital costs and running costs and it is applied to prepare a detailed estimate of costs for irradiation processing of onions and fish in India. The cost of processing onions worked out to be between Rs. 40 to 120 per 1000 Kg and for fish Rs 354 per 1000 Kg. These estimates do not take into account transparation costs and fluctuations in marketing procedures. (M.G.B.). 7 tables

  8. Cost estimation tools in Germany and the UK. Comparison of cost estimates and actual costs

    International Nuclear Information System (INIS)

    Pfeifer, W.; Gordelier, S.; Drake, V.

    2005-01-01

    Full text: Accurate cost estimation for future decommissioning projects is a matter of considerable importance, especially for ensuring that sufficient funds will be available at the time of project implementation. This paper looks at the experience of cost estimation and real implementation outcomes from two countries, Germany and the UK, and draws lessons for the future. In Germany, cost estimates for the decommissioning of power reactors are updated every two years. For this purpose, the STILLKO program of the NIS Company is used. So far, Forschungszentrum Karlsruhe has successfully decommissioned two prototype reactor facilities. Re-cultivation of the premises has already been completed. At the moment, the activated components of the multi-purpose research reactor (MZFR), the first pressurized water reactor in Germany that was moderated and cooled with heavy water, and of the prototype fast breeder reactor (KNK) are being dismantled remotely. Consequently, vast experience exists in particular for the updating of total costs on the basis of actually incurred expenses. The further the dismantling work proceeds, the more reliable is the total cost estimate. Here, the development of the estimated MZFR decommissioning costs shall be presented and compared with the estimates obtained for a German reference PWR-type power reactor of 1200 MW. In this way: - common features of the prototype reactor and power reactor shall be emphasized, - several parameters leading to an increase in the estimated costs shall be highlighted, - cost risks shall be outlined with the remote dismantling of the reactor pressure vessel serving as an example, - calculation parameters shall be presented, and - recommendations shall be made for a consistent estimation of costs. The United Kingdom Atomic Energy Authority (UKAEA) has a major programme for the environmental remediation of its former research and development sites at Dounreay, Windscale, Harwell and Winfrith together with the need to

  9. Outer planet probe cost estimates: First impressions

    Science.gov (United States)

    Niehoff, J.

    1974-01-01

    An examination was made of early estimates of outer planetary atmospheric probe cost by comparing the estimates with past planetary projects. Of particular interest is identification of project elements which are likely cost drivers for future probe missions. Data are divided into two parts: first, the description of a cost model developed by SAI for the Planetary Programs Office of NASA, and second, use of this model and its data base to evaluate estimates of probe costs. Several observations are offered in conclusion regarding the credibility of current estimates and specific areas of the outer planet probe concept most vulnerable to cost escalation.

  10. Preliminary cost estimating for the nuclear industry

    International Nuclear Information System (INIS)

    Klumpar, I.V.; Soltz, K.M.

    1985-01-01

    The nuclear industry has higher costs for personnel, equipment, construction, and engineering than conventional industry, which means that cost estimation procedures may need adjustment. The authors account for the special technical and labor requirements of the nuclear industry in making adjustments to equipment and installation cost estimations. Using illustrative examples, they show that conventional methods of preliminary cost estimation are flexible enough for application to emerging industries if their cost structure is similar to that of the process industries. If not, modifications can provide enough engineering and cost data for a statistical analysis. 9 references, 14 figures, 4 tables

  11. Estimated cost of overactive bladder in Thailand.

    Science.gov (United States)

    Prasopsanti, Kriangsak; Santi-Ngamkun, Apirak; Pornprasit, Kanokwan

    2007-11-01

    To estimate the annual direct and indirect costs of overactive bladder (OAB) in indigenous Thai people aged 18 years and over in the year 2005. Economically based models using diagnostic and treatment algorithms from clinical practice guidelines and current disease prevalence data were used to estimate direct and indirect costs of OAB. Prevalence and event probability estimates were obtained from the literature, national data sets, and expert opinion. Costs were estimated from a small survey using a cost questionnaire and from unit costs of King Chulalongkorn Memorial Hospital. The annual cost of OAB in Thailand is estimated as 1.9 billion USD. It is estimated to consume 1.14% of national GDP The cost includes 0.33 billion USD for direct medical costs, 1.3 billion USD for direct, nonmedical costs and 0.29 billion USD for indirect costs of lost productivity. The largest costs category was direct treatment costs of comorbidities associated with OAB. Costs of OAB medication accountedfor 14% of the total costs ofOAB.

  12. Cost estimation of Kyoto Protocol

    International Nuclear Information System (INIS)

    Di Giulio, Enzo

    2005-01-01

    This article proposes a reflection on important aspects in the costs determination performance of Kyoto Protocol. The evaluation of the main models evidence possible impacts on the economies. A key role in the determination of the cost is represented by the relative hypothesis to emission trading and the projects CDM-JI and from the political capacity at the cost negative or equal to zero [it

  13. Historical estimates of national accounts magnitudes in Greece: 1830-1939

    OpenAIRE

    Κωστελένος, Γεώργιος Κ.

    2007-01-01

    The study of long run economic development is facilitated immensely by the existence of relevant data. In this context, long run national accounts magnitudes are probably the most important. This has been realized since the early 1950s by economists of the stature of Kuznets, Friedman and North and relevant time series have been estimated, originally for countries like the U.S.A. and Great Britain and subsequently for other developed and less developed countries. In Greece, how...

  14. Combining Neural Networks with Existing Methods to Estimate 1 in 100-Year Flood Event Magnitudes

    Science.gov (United States)

    Newson, A.; See, L.

    2005-12-01

    Over the last fifteen years artificial neural networks (ANN) have been shown to be advantageous for the solution of many hydrological modelling problems. The use of ANNs for flood magnitude estimation in ungauged catchments, however, is a relatively new and under researched area. In this paper ANNs are used to make estimates of the magnitude of the 100-year flood event (Q100) for a number of ungauged catchments. The data used in this study were provided by the Centre for Ecology and Hydrology's Flood Estimation Handbook (FEH), which contains information on catchments across the UK. Sixteen catchment descriptors for 719 catchments were used to train an ANN, which was split into a training, validation and test data set. The goodness-of-fit statistics on the test data set indicated good model performance, with an r-squared value of 0.8 and a coefficient of efficiency of 79 percent. Data for twelve ungauged catchments were then put through the trained ANN to produce estimates of Q100. Two other accepted methodologies were also employed: the FEH statistical method and the FSR (Flood Studies Report) design storm technique, both of which are used to produce flood frequency estimates. The advantage of developing an ANN model is that it provides a third figure to aid a hydrologist in making an accurate estimate. For six of the twelve catchments, there was a relatively low spread between estimates. In these instances, an estimate of Q100 could be made with a fair degree of certainty. Of the remaining six catchments, three had areas greater than 1000km2, which means the FSR design storm estimate cannot be used. Armed with the ANN model and the FEH statistical method the hydrologist still has two possible estimates to consider. For these three catchments, the estimates were also fairly similar, providing additional confidence to the estimation. In summary, the findings of this study have shown that an accurate estimation of Q100 can be made using the catchment descriptors of

  15. A Novel Method for Age Estimation in Solar-Type Stars Through GALEX FUV Magnitudes

    Science.gov (United States)

    Ho, Kelly; Subramonian, Arjun; Smith, Graeme; Shouru Shieh

    2018-01-01

    Utilizing an inverse association known to exist between Galaxy Evolution Explorer (GALEX) far ultraviolet (FUV) magnitudes and the chromospheric activity of F, G, and K dwarfs, we explored a method of age estimation in solar-type stars through GALEX FUV magnitudes. Sample solar-type star data were collected from refereed publications and filtered by B-V and absolute visual magnitude to ensure similarities in temperature and luminosity to the Sun. We determined FUV-B and calculated a residual index Q for all the stars, using the temperature-induced upper bound on FUV-B as the fiducial. Plotting current age estimates for the stars against Q, we discovered a strong and significant association between the variables. By applying a log-linear transformation to the data to produce a strong correlation between Q and loge Age, we confirmed the association between Q and age to be exponential. Thus, least-squares regression was used to generate an exponential model relating Q to age in solar-type stars, which can be used by astronomers. The Q-method of stellar age estimation is simple and more efficient than existing spectroscopic methods and has applications to galactic archaeology and stellar chemical composition analysis.

  16. Magnitude X on the Richter Scale: Welfare Cost of Business Cycles in Developing Countries

    OpenAIRE

    Stephane Pallage; Michel Robe

    2000-01-01

    Economic fluctuations are much stronger in developing countries than in the United States. Yet, while a large literature debates what constitutes a reasonable estimate of the welfare cost of business cycles in the US, it remains an open question how large that cost is in developing countries. Using several model economies, we provide such a measure for a large number of low--income countries. Our first main result is that the welfare cost of output fluctuations per se is far from trivial in t...

  17. Towards Greater Harmonisation of Decommissioning Cost Estimates

    International Nuclear Information System (INIS)

    O'Sullivan, Patrick; ); Laraia, Michele; ); LaGuardia, Thomas S.

    2010-01-01

    The NEA Decommissioning Cost Estimation Group (DCEG), in collaboration with the IAEA Waste Technology Section and the EC Directorate-General for Energy and Transport, has recently studied cost estimation practices in 12 countries - Belgium, Canada, France, Germany, Italy, Japan, the Netherlands, Slovakia, Spain, Sweden, the United Kingdom and the United States. Its findings are to be published in an OECD/NEA report entitled Cost Estimation for Decommissioning: An International Overview of Cost Elements, Estimation Practices and Reporting Requirements. This booklet highlights the findings contained in the full report. (authors)

  18. Cost-estimating relationships for space programs

    Science.gov (United States)

    Mandell, Humboldt C., Jr.

    1992-01-01

    Cost-estimating relationships (CERs) are defined and discussed as they relate to the estimation of theoretical costs for space programs. The paper primarily addresses CERs based on analogous relationships between physical and performance parameters to estimate future costs. Analytical estimation principles are reviewed examining the sources of errors in cost models, and the use of CERs is shown to be affected by organizational culture. Two paradigms for cost estimation are set forth: (1) the Rand paradigm for single-culture single-system methods; and (2) the Price paradigms that incorporate a set of cultural variables. For space programs that are potentially subject to even small cultural changes, the Price paradigms are argued to be more effective. The derivation and use of accurate CERs is important for developing effective cost models to analyze the potential of a given space program.

  19. The Effect of Amplifier Bias Drift on Differential Magnitude Estimation in Multiple-Star Systems

    Science.gov (United States)

    Tyler, David W.; Muralimanohar, Hariharan; Borelli, Kathy J.

    2007-02-01

    We show how the temporal drift of CCD amplifier bias can cause significant relative magnitude estimation error in speckle interferometric observations of multiple-star systems. When amplifier bias varies over time, the estimation error arises if the time between acquisition of dark-frame calibration data and science data is long relative to the timescale over which the bias changes. Using analysis, we show that while detector-temperature drift over time causes a variation in accumulated dark current and a residual bias in calibrated imagery, only amplifier bias variations cause a residual bias in the estimated energy spectrum. We then use telescope data taken specifically to investigate this phenomenon to show that for the detector used, temporal bias drift can cause residual energy spectrum bias as large or larger than the mean value of the noise energy spectrum. Finally, we use a computer simulation to demonstrate the effect of residual bias on differential magnitude estimation. A supplemental calibration technique is described in the appendices.

  20. Rapid estimation of earthquake magnitude from the arrival time of the peak high‐frequency amplitude

    Science.gov (United States)

    Noda, Shunta; Yamamoto, Shunroku; Ellsworth, William L.

    2016-01-01

    We propose a simple approach to measure earthquake magnitude M using the time difference (Top) between the body‐wave onset and the arrival time of the peak high‐frequency amplitude in an accelerogram. Measured in this manner, we find that Mw is proportional to 2logTop for earthquakes 5≤Mw≤7, which is the theoretical proportionality if Top is proportional to source dimension and stress drop is scale invariant. Using high‐frequency (>2  Hz) data, the root mean square (rms) residual between Mw and MTop(M estimated from Top) is approximately 0.5 magnitude units. The rms residuals of the high‐frequency data in passbands between 2 and 16 Hz are uniformly smaller than those obtained from the lower‐frequency data. Top depends weakly on epicentral distance, and this dependence can be ignored for distances earthquake produces a final magnitude estimate of M 9.0 at 120 s after the origin time. We conclude that Top of high‐frequency (>2  Hz) accelerograms has value in the context of earthquake early warning for extremely large events.

  1. A comparison of moment magnitude estimates for the European-Mediterranean and Italian regions

    Science.gov (United States)

    Gasperini, Paolo; Lolli, Barbara; Vannucci, Gianfranco; Boschi, Enzo

    2012-09-01

    With the goal of constructing a homogeneous data set of moment magnitudes (Mw) to be used for seismic hazard assessment, we compared Mw estimates from moment tensor catalogues available online. We found an apparent scaling disagreement between Mw estimates from the National Earthquake Information Center (NEIC) of the US Geological Survey and from the Global Centroid Moment Tensor (GCMT) project. We suspect that this is the effect of an underestimation of Mw > 7.0 (M0 > 4.0 × 1019 Nm) computed by NEIC owing to the limitations of their computational approach. We also found an apparent scaling disagreement between GCMT and two regional moment tensor catalogues provided by the 'Eidgenössische Technische Hochschule Zürich' (ETHZ) and by the European-Mediterranean Regional Centroid Moment Tensor (RCMT) project of the Italian 'Istituto Nazionale di Geofisica e Vulcanologia' (INGV). This is probably the effect of the overestimation of Mw < 5.5 (M0 < 2.2 × 1017 Nm), up to year 2002, and of Mw < 5.0 (M0 < 4.0 × 1016 Nm), since year 2003, owing to the physical limitations of the standard CMT inversion method used by GCMT for the earthquakes of relatively low magnitude. If the discrepant data are excluded from the comparisons, the scaling disagreements become insignificant in all cases. We observed instead small absolute offsets (≤0.1 units) for NEIC and ETHZ catalogues with respect to GCMT whereas there is an almost perfect correspondence between RCMT and GCMT. Finally, we found a clear underestimation of about 0.2 units of Mw magnitudes computed at the INGV using the time-domain moment tensor (TDMT) method with respect to those reported by GCMT and RCMT. According to our results, we suggest appropriate offset corrections to be applied to Mw estimates from NEIC, ETHZ and TDMT catalogues before merging their data with GCMT and RCMT catalogues. We suggest as well to discard the probably discrepant data from NEIC and GCMT if other Mw estimates from different sources are

  2. Cost Estimating Handbook for Environmental Restoration

    International Nuclear Information System (INIS)

    1993-01-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals

  3. A Bayesian framework for estimating moment magnitude and its uncertainty from macroseismic intensity measures

    Science.gov (United States)

    Kawabata, E.; Main, I. G.; Naylor, M.; Chandler, R. E.

    2016-12-01

    In moderate to low seismicity areas such as the UK, earthquakes represent a small but not negligible risk to sensitive structures such as nuclear power plants. As a part of the safety case in the planning and regulation of such structures, seismic activity must first be monitored and quantified to form a catalogue of past events. In a low or moderate seismicity zone, most of our knowledge of the most significant events comes from macroseismic intensity measures from the pre-instrumental period (before 1900). These historical records must then be combined and calibrated with modern analogue and digitally-recorded instrumental data on a common source magnitude scale, the most useful of which is the moment magnitude. The result is a unified catalogue that can be used for probabilistic seismic hazard analysis. An isoseismal map involves a set of contours that enclose the areas at which the event was felt at particular intensity values or higher, called felt areas. It has been common practice to draw these contours by hand with varying degrees of subjectivity. Here, we demonstrate a Bayesian method for constructing such maps objectively from macroseismic intensity measures and their observed locations. It involves using mathematical expressions to represent concentric ellipses and estimating their optimal parameters and uncertainties in a Bayesian framework. Inferred fault orientations in the UK are predominantly vertical, so the elliptical assumption is reasonable at least to first order or as a null hypothesis. Relevant physical constraints are used as priors where available. The resulting posterior distributions are used to calculate felt area at a given intensity, as well as a probability density function for the inferred epicentre. We then describe another Bayesian approach for deriving moment magnitude from felt areas based on their relationship and known constraints such as the frequency-magnitude distribution. The use of Bayesian inference allows us to quantify

  4. Method for developing cost estimates for generic regulatory requirements

    International Nuclear Information System (INIS)

    1985-01-01

    The NRC has established a practice of performing regulatory analyses, reflecting costs as well as benefits, of proposed new or revised generic requirements. A method had been developed to assist the NRC in preparing the types of cost estimates required for this purpose and for assigning priorities in the resolution of generic safety issues. The cost of a generic requirement is defined as the net present value of total lifetime cost incurred by the public, industry, and government in implementing the requirement for all affected plants. The method described here is for commercial light-water-reactor power plants. Estimating the cost for a generic requirement involves several steps: (1) identifying the activities that must be carried out to fully implement the requirement, (2) defining the work packages associated with the major activities, (3) identifying the individual elements of cost for each work package, (4) estimating the magnitude of each cost element, (5) aggregating individual plant costs over the plant lifetime, and (6) aggregating all plant costs and generic costs to produce a total, national, present value of lifetime cost for the requirement. The method developed addresses all six steps. In this paper, we discuss on the first three

  5. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M E; Prasad, C; Toothman, D A; Kaplan, N

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  6. Demystifying the Cost Estimation Process

    Science.gov (United States)

    Obi, Samuel C.

    2010-01-01

    In manufacturing today, nothing is more important than giving a customer a clear and straight-forward accounting of what their money has purchased. Many potentially promising return business orders are lost because of unclear, ambiguous, or improper billing. One of the best ways of resolving cost bargaining conflicts is by providing a…

  7. Estimates of the magnitudes of major marine mass extinctions in earth history

    Science.gov (United States)

    Stanley, Steven M.

    2016-10-01

    Procedures introduced here make it possible, first, to show that background (piecemeal) extinction is recorded throughout geologic stages and substages (not all extinction has occurred suddenly at the ends of such intervals); second, to separate out background extinction from mass extinction for a major crisis in earth history; and third, to correct for clustering of extinctions when using the rarefaction method to estimate the percentage of species lost in a mass extinction. Also presented here is a method for estimating the magnitude of the Signor-Lipps effect, which is the incorrect assignment of extinctions that occurred during a crisis to an interval preceding the crisis because of the incompleteness of the fossil record. Estimates for the magnitudes of mass extinctions presented here are in most cases lower than those previously published. They indicate that only ˜81% of marine species died out in the great terminal Permian crisis, whereas levels of 90-96% have frequently been quoted in the literature. Calculations of the latter numbers were incorrectly based on combined data for the Middle and Late Permian mass extinctions. About 90 orders and more than 220 families of marine animals survived the terminal Permian crisis, and they embodied an enormous amount of morphological, physiological, and ecological diversity. Life did not nearly disappear at the end of the Permian, as has often been claimed.

  8. Estimates of the magnitudes of major marine mass extinctions in earth history.

    Science.gov (United States)

    Stanley, Steven M

    2016-10-18

    Procedures introduced here make it possible, first, to show that background (piecemeal) extinction is recorded throughout geologic stages and substages (not all extinction has occurred suddenly at the ends of such intervals); second, to separate out background extinction from mass extinction for a major crisis in earth history; and third, to correct for clustering of extinctions when using the rarefaction method to estimate the percentage of species lost in a mass extinction. Also presented here is a method for estimating the magnitude of the Signor-Lipps effect, which is the incorrect assignment of extinctions that occurred during a crisis to an interval preceding the crisis because of the incompleteness of the fossil record. Estimates for the magnitudes of mass extinctions presented here are in most cases lower than those previously published. They indicate that only ∼81% of marine species died out in the great terminal Permian crisis, whereas levels of 90-96% have frequently been quoted in the literature. Calculations of the latter numbers were incorrectly based on combined data for the Middle and Late Permian mass extinctions. About 90 orders and more than 220 families of marine animals survived the terminal Permian crisis, and they embodied an enormous amount of morphological, physiological, and ecological diversity. Life did not nearly disappear at the end of the Permian, as has often been claimed.

  9. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  10. Cost estimating for large nuclear projects

    International Nuclear Information System (INIS)

    Duggal, A.; Hunt, M.

    2004-01-01

    In today's market, the generation of electricity is a very competitive business, which is constantly under the watchful eye of the media and public. Nuclear power faces a lot of competition from other sources such as hydro, coal and gas. Controlling costs, monitoring costs, feedback, industry knowledge and up to date cost estimating tools are essential for a nuclear company to compete on a long term basis. This paper reviews the terminology and estimating principles used for the construction of new nuclear plants, lifetime operating costs, and the costs associated with refurbishment work. (author)

  11. Fundamental aspects of seismic event detection, magnitude estimation and their interrelation

    International Nuclear Information System (INIS)

    Ringdal, F.

    1977-01-01

    The main common subject of the papers forming this thesis is statistical model development within the seismological disciplines of seismic event detection and event magnitude estimation. As more high quality seismic data become available as a result of recent seismic network developments, the opportunity will exist for large scale application and further refinement of these models. It is hoped that the work presented here will facilitate improved understanding of the basic issues, both within earthquake-explosion discrimination, in the framework of which most of this work originated, and in seismology in general. (Auth.)

  12. Estimating and understanding DOE waste management costs'

    International Nuclear Information System (INIS)

    Kang, J.S.; Sherick, M.J.

    1995-01-01

    This paper examines costs associated with cleaning up the US Department of Energy's (DOE's) nuclear facilities, with particular emphasis on the waste management program. Life-cycle waste management costs have been compiled and reported in the DOE Baseline Environmental Management Report (BEMR). Waste management costs are a critical issue for DOE because of the current budget constraints. The DOE sites are struggling to accomplish their environmental management objectives given funding scenarios that are well below anticipated waste management costs. Through the BEMR process, DOE has compiled complex-wide cleanup cost estimates and has begun analysis of these costs with respect to alternative waste management scenarios and policy strategies. From this analysis, DOE is attempting to identify the major cost drivers and prioritize environmental management activities to achieve maximum utilization of existing funding. This paper provides an overview of the methodology DOE has used to estimate and analyze some waste management costs, including the key data requirements and uncertainties

  13. Parametric cost estimation for space science missions

    Science.gov (United States)

    Lillie, Charles F.; Thompson, Bruce E.

    2008-07-01

    Cost estimation for space science missions is critically important in budgeting for successful missions. The process requires consideration of a number of parameters, where many of the values are only known to a limited accuracy. The results of cost estimation are not perfect, but must be calculated and compared with the estimates that the government uses for budgeting purposes. Uncertainties in the input parameters result from evolving requirements for missions that are typically the "first of a kind" with "state-of-the-art" instruments and new spacecraft and payload technologies that make it difficult to base estimates on the cost histories of previous missions. Even the cost of heritage avionics is uncertain due to parts obsolescence and the resulting redesign work. Through experience and use of industry best practices developed in participation with the Aerospace Industries Association (AIA), Northrop Grumman has developed a parametric modeling approach that can provide a reasonably accurate cost range and most probable cost for future space missions. During the initial mission phases, the approach uses mass- and powerbased cost estimating relationships (CER)'s developed with historical data from previous missions. In later mission phases, when the mission requirements are better defined, these estimates are updated with vendor's bids and "bottoms- up", "grass-roots" material and labor cost estimates based on detailed schedules and assigned tasks. In this paper we describe how we develop our CER's for parametric cost estimation and how they can be applied to estimate the costs for future space science missions like those presented to the Astronomy & Astrophysics Decadal Survey Study Committees.

  14. Evaluating Annual Maximum and Partial Duration Series for Estimating Frequency of Small Magnitude Floods

    Directory of Open Access Journals (Sweden)

    Fazlul Karim

    2017-06-01

    Full Text Available Understanding the nature of frequent floods is important for characterising channel morphology, riparian and aquatic habitat, and informing river restoration efforts. This paper presents results from an analysis on frequency estimates of low magnitude floods using the annual maximum and partial series data compared to actual flood series. Five frequency distribution models were fitted to data from 24 gauging stations in the Great Barrier Reef (GBR lagoon catchments in north-eastern Australia. Based on the goodness of fit test, Generalised Extreme Value, Generalised Pareto and Log Pearson Type 3 models were used to estimate flood frequencies across the study region. Results suggest frequency estimates based on a partial series are better, compared to an annual series, for small to medium floods, while both methods produce similar results for large floods. Although both methods converge at a higher recurrence interval, the convergence recurrence interval varies between catchments. Results also suggest frequency estimates vary slightly between two or more partial series, depending on flood threshold, and the differences are large for the catchments that experience less frequent floods. While a partial series produces better frequency estimates, it can underestimate or overestimate the frequency if the flood threshold differs largely compared to bankfull discharge. These results have significant implications in calculating the dependency of floodplain ecosystems on the frequency of flooding and their subsequent management.

  15. Absolute magnitude estimation and relative judgement approaches to subjective workload assessment

    Science.gov (United States)

    Vidulich, Michael A.; Tsang, Pamela S.

    1987-01-01

    Two rating scale techniques employing an absolute magnitude estimation method, were compared to a relative judgment method for assessing subjective workload. One of the absolute estimation techniques used was an unidimensional overall workload scale and the other was the multidimensional NASA-Task Load Index technique. Thomas Saaty's Analytic Hierarchy Process was the unidimensional relative judgment method used. These techniques were used to assess the subjective workload of various single- and dual-tracking conditions. The validity of the techniques was defined as their ability to detect the same phenomena observed in the tracking performance. Reliability was assessed by calculating test-retest correlations. Within the context of the experiment, the Saaty Analytic Hierarchy Process was found to be superior in validity and reliability. These findings suggest that the relative judgment method would be an effective addition to the currently available subjective workload assessment techniques.

  16. Methodology for Estimation of Flood Magnitude and Frequency for New Jersey Streams

    Science.gov (United States)

    Watson, Kara M.; Schopp, Robert D.

    2009-01-01

    Methodologies were developed for estimating flood magnitudes at the 2-, 5-, 10-, 25-, 50-, 100-, and 500-year recurrence intervals for unregulated or slightly regulated streams in New Jersey. Regression equations that incorporate basin characteristics were developed to estimate flood magnitude and frequency for streams throughout the State by use of a generalized least squares regression analysis. Relations between flood-frequency estimates based on streamflow-gaging-station discharge and basin characteristics were determined by multiple regression analysis, and weighted by effective years of record. The State was divided into five hydrologically similar regions to refine the regression equations. The regression analysis indicated that flood discharge, as determined by the streamflow-gaging-station annual peak flows, is related to the drainage area, main channel slope, percentage of lake and wetland areas in the basin, population density, and the flood-frequency region, at the 95-percent confidence level. The standard errors of estimate for the various recurrence-interval floods ranged from 48.1 to 62.7 percent. Annual-maximum peak flows observed at streamflow-gaging stations through water year 2007 and basin characteristics determined using geographic information system techniques for 254 streamflow-gaging stations were used for the regression analysis. Drainage areas of the streamflow-gaging stations range from 0.18 to 779 mi2. Peak-flow data and basin characteristics for 191 streamflow-gaging stations located in New Jersey were used, along with peak-flow data for stations located in adjoining States, including 25 stations in Pennsylvania, 17 stations in New York, 16 stations in Delaware, and 5 stations in Maryland. Streamflow records for selected stations outside of New Jersey were included in the present study because hydrologic, physiographic, and geologic boundaries commonly extend beyond political boundaries. The StreamStats web application was developed

  17. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  18. Cost-estimating for commercial digital printing

    Science.gov (United States)

    Keif, Malcolm G.

    2007-01-01

    The purpose of this study is to document current cost-estimating practices used in commercial digital printing. A research study was conducted to determine the use of cost-estimating in commercial digital printing companies. This study answers the questions: 1) What methods are currently being used to estimate digital printing? 2) What is the relationship between estimating and pricing digital printing? 3) To what extent, if at all, do digital printers use full-absorption, all-inclusive hourly rates for estimating? Three different digital printing models were identified: 1) Traditional print providers, who supplement their offset presswork with digital printing for short-run color and versioned commercial print; 2) "Low-touch" print providers, who leverage the power of the Internet to streamline business transactions with digital storefronts; 3) Marketing solutions providers, who see printing less as a discrete manufacturing process and more as a component of a complete marketing campaign. Each model approaches estimating differently. Understanding and predicting costs can be extremely beneficial. Establishing a reliable system to estimate those costs can be somewhat challenging though. Unquestionably, cost-estimating digital printing will increase in relevance in the years ahead, as margins tighten and cost knowledge becomes increasingly more critical.

  19. Estimating the costs of human space exploration

    Science.gov (United States)

    Mandell, Humboldt C., Jr.

    1994-01-01

    The plan for NASA's new exploration initiative has the following strategic themes: (1) incremental, logical evolutionary development; (2) economic viability; and (3) excellence in management. The cost estimation process is involved with all of these themes and they are completely dependent upon the engineering cost estimator for success. The purpose is to articulate the issues associated with beginning this major new government initiative, to show how NASA intends to resolve them, and finally to demonstrate the vital importance of a leadership role by the cost estimation community.

  20. Nuclear shipping and waste disposal cost estimates

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1977-11-01

    Cost estimates for the shipping of spent fuel from the reactor, shipping of waste from the reprocessing plant, and disposal of reprocessing plant wastes have been made for five reactor types. The reactors considered are the light-water reactor (LWR), the mixed-oxide-fueled light-water reactor (MOX), the Canadian deuterium-uranium reactor (CANDU), the fast breeder reactor (FBR), and the high-temperature gas-cooled reactor (HTGR). In addition to the cost estimates, this report provides details on the bases and assumptions used to develop the cost estimates

  1. Econometric estimation of country-specific hospital costs

    Directory of Open Access Journals (Sweden)

    Murray Christopher JL

    2003-02-01

    Full Text Available Abstract Information on the unit cost of inpatient and outpatient care is an essential element for costing, budgeting and economic-evaluation exercises. Many countries lack reliable estimates, however. WHO has recently undertaken an extensive effort to collect and collate data on the unit cost of hospitals and health centres from as many countries as possible; so far, data have been assembled from 49 countries, for various years during the period 1973–2000. The database covers a total of 2173 country-years of observations. Large gaps remain, however, particularly for developing countries. Although the long-term solution is that all countries perform their own costing studies, the question arises whether it is possible to predict unit costs for different countries in a standardized way for short-term use. The purpose of the work described in this paper, a modelling exercise, was to use the data collected across countries to predict unit costs in countries for which data are not yet available, with the appropriate uncertainty intervals. The model presented here forms part of a series of models used to estimate unit costs for the WHO-CHOICE project. The methods and the results of the model, however, may be used to predict a number of different types of country-specific unit costs, depending on the purpose of the exercise. They may be used, for instance, to estimate the costs per bed-day at different capacity levels; the "hotel" component of cost per bed-day; or unit costs net of particular components such as drugs. In addition to reporting estimates for selected countries, the paper shows that unit costs of hospitals vary within countries, sometimes by an order of magnitude. Basing cost-effectiveness studies or budgeting exercises on the results of a study of a single facility, or even a small group of facilities, is likely to be misleading.

  2. Estimating the cost of a smoking employee.

    Science.gov (United States)

    Berman, Micah; Crane, Rob; Seiber, Eric; Munur, Mehmet

    2014-09-01

    We attempted to estimate the excess annual costs that a US private employer may attribute to employing an individual who smokes tobacco as compared to a non-smoking employee. Reviewing and synthesising previous literature estimating certain discrete costs associated with smoking employees, we developed a cost estimation approach that approximates the total of such costs for U.S. employers. We examined absenteeism, presenteesim, smoking breaks, healthcare costs and pension benefits for smokers. Our best estimate of the annual excess cost to employ a smoker is $5816. This estimate should be taken as a general indicator of the extent of excess costs, not as a predictive point value. Employees who smoke impose significant excess costs on private employers. The results of this study may help inform employer decisions about tobacco-related policies. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  3. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  4. Statistical methods of estimating mining costs

    Science.gov (United States)

    Long, K.R.

    2011-01-01

    Until it was defunded in 1995, the U.S. Bureau of Mines maintained a Cost Estimating System (CES) for prefeasibility-type economic evaluations of mineral deposits and estimating costs at producing and non-producing mines. This system had a significant role in mineral resource assessments to estimate costs of developing and operating known mineral deposits and predicted undiscovered deposits. For legal reasons, the U.S. Geological Survey cannot update and maintain CES. Instead, statistical tools are under development to estimate mining costs from basic properties of mineral deposits such as tonnage, grade, mineralogy, depth, strip ratio, distance from infrastructure, rock strength, and work index. The first step was to reestimate "Taylor's Rule" which relates operating rate to available ore tonnage. The second step was to estimate statistical models of capital and operating costs for open pit porphyry copper mines with flotation concentrators. For a sample of 27 proposed porphyry copper projects, capital costs can be estimated from three variables: mineral processing rate, strip ratio, and distance from nearest railroad before mine construction began. Of all the variables tested, operating costs were found to be significantly correlated only with strip ratio.

  5. The great environmental restoration cost estimating shootout: A blind test of three DOE cost estimating groups

    International Nuclear Information System (INIS)

    Klemen, Paul

    1992-01-01

    The cost of the Department of Energy's (DOE) Environmental Restoration (ER) Program has increased steadily over the last three years and, in the process, has drawn increasing scrutiny from Congress, the public, and government agencies such as the Office of Management and Budget and the General Accounting Office. Programmatic costs have been reviewed by many groups from within the DOE as well as from outside agencies. While cost may appear to be a universally applicable barometer of project conditions, it is actually a single dimensional manifestation of a complex set of conditions. As such, variations in cost estimates can be caused by a variety of underlying factors such as changes in scope, schedule, performing organization, economic conditions, or regulatory environment. This paper will examine the subject of cost estimates by evaluating three different cost estimates prepared for a single project including two estimates prepared by project proponents and another estimate prepared by a review team. The paper identifies the reasons for cost growth as measured by the different estimates and evaluates the ability of review estimates to measure the validity of costs. The comparative technique used to test the three cost estimates will identify the reasons for changes in the estimated cost, over time, and evaluate the ability of an independent review to correctly identify the reasons for cost growth and evaluate the reasonableness of the cost proposed by the project proponents. Recommendations are made for improved cost estimates and improved cost estimate reviews. Conclusions are reached regarding the differences in estimate results that can be attributed to differences in estimating techniques, the implications of these differences for decision makers, and circumstances that are unique to environmental cost estimating. (author)

  6. Los Alamos Waste Management Cost Estimation Model

    International Nuclear Information System (INIS)

    Matysiak, L.M.; Burns, M.L.

    1994-03-01

    This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs

  7. Estimating flexural rigidity and load magnitude required for formation of Ross Island flexure moat

    Science.gov (United States)

    Jha, S.; Harry, D. L.; Wenman, C. P.

    2017-12-01

    rigidity estimate of 6.9 x 1019 Nm. The load magnitudes determined from these flexure models lie in the range of 4.6 x 1015 N - 4.3 x 1016 N. This is less than the topographic load (6.9 x 1017 N estimated from BEDMAP2) produced by the island by one to two orders of magnitude. The difference in load magnitudes suggest anomalously low densities caused by high lower crust and mantle temperatures in the region.

  8. NASA Software Cost Estimation Model: An Analogy Based Estimation Model

    Science.gov (United States)

    Hihn, Jairus; Juster, Leora; Menzies, Tim; Mathew, George; Johnson, James

    2015-01-01

    The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K-­ nearest neighbor prediction model performance on the same data set.

  9. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M.E.; Prasad, C.; Toothman, D.A.; Kaplan, N.

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  10. Reevaluation of the macroseismic effects of the 1887 Sonora, Mexico earthquake and its magnitude estimation

    Science.gov (United States)

    Suárez, Gerardo; Hough, Susan E.

    2008-01-01

    The Sonora, Mexico, earthquake of 3 May 1887 occurred a few years before the start of the instrumental era in seismology. We revisit all available accounts of the earthquake and assign Modified Mercalli Intensities (MMI), interpreting and analyzing macroseismic information using the best available modern methods. We find that earlier intensity assignments for this important earthquake were unjustifiably high in many cases. High intensity values were assigned based on accounts of rock falls, soil failure or changes in the water table, which are now known to be very poor indicators of shaking severity and intensity. Nonetheless, reliable accounts reveal that light damage (intensity VI) occurred at distances of up to ~200 km in both Mexico and the United States. The resulting set of 98 reevaluated intensity values is used to draw an isoseismal map of this event. Using the attenuation relation proposed by Bakun (2006b), we estimate an optimal moment magnitude of Mw7.6. Assuming this magnitude is correct, a fact supported independently by documented rupture parameters assuming standard scaling relations, our results support the conclusion that northern Sonora as well as the Basin and Range province are characterized by lower attenuation of intensities than California. However, this appears to be at odds with recent results that Lg attenuation in the Basin and Range province is comparable to that in California.

  11. Stochastic cost estimating in repository life-cycle cost analysis

    International Nuclear Information System (INIS)

    Tzemos, S.; Dippold, D.

    1986-01-01

    The conceptual development, the design, and the final construction and operation of a nuclear repository span many decades. Given this lengthy time frame, it is quite challenging to obtain a good approximation of the repository life-cycle cost. One can deal with this challenge by using an analytic method, the method of moments, to explicitly assess the uncertainty of the estimate. A series expansion is used to approximate the uncertainty distribution of the cost estimate. In this paper, the moment methodology is derived and is illustrated through a numerical example. The range of validity of the approximation is discussed. The method of moments is compared to the traditional stochastic cost estimating methods and found to provide more and better information on cost uncertainty. The tow methods converge to identical results as the number of convolved variables increases and approaches the range where the central limit theorem is valid

  12. 40 CFR 261.142 - Cost estimate.

    Science.gov (United States)

    2010-07-01

    ... hazardous waste, and the potential cost of closing the facility as a treatment, storage, and disposal... facility. (3) The cost estimate may not incorporate any salvage value that may be realized with the sale of... no later than 30 days after a change in a facility's operating plan or design that would increase the...

  13. Decommissioning Cost Estimating -The ''Price'' Approach

    International Nuclear Information System (INIS)

    Manning, R.; Gilmour, J.

    2002-01-01

    Over the past 9 years UKAEA has developed a formalized approach to decommissioning cost estimating. The estimating methodology and computer-based application are known collectively as the PRICE system. At the heart of the system is a database (the knowledge base) which holds resource demand data on a comprehensive range of decommissioning activities. This data is used in conjunction with project specific information (the quantities of specific components) to produce decommissioning cost estimates. PRICE is a dynamic cost-estimating tool, which can satisfy both strategic planning and project management needs. With a relatively limited analysis a basic PRICE estimate can be produced and used for the purposes of strategic planning. This same estimate can be enhanced and improved, primarily by the improvement of detail, to support sanction expenditure proposals, and also as a tender assessment and project management tool. The paper will: describe the principles of the PRICE estimating system; report on the experiences of applying the system to a wide range of projects from contaminated car parks to nuclear reactors; provide information on the performance of the system in relation to historic estimates, tender bids, and outturn costs

  14. Cost estimation for decommissioning of research reactors

    International Nuclear Information System (INIS)

    Grossi, Pablo Andrade; Tello, Cledola Cassia Oliveira de; Segabinaze, Roberto de Oliveira; Daniska, Vladimir

    2013-01-01

    In the case of research reactors, the limited data that is available tends to provide only overall decommissioning costs, without any breakdown of the main cost elements. In order to address this subject, it is important to collect and analyse all available data of decommissioning costs for the research reactors. The IAEA has started the DACCORD Project focused on data analysis and costing of research reactors decommissioning. Data collection is organized in accordance with the International Structure for Decommissioning Costing (ISDC), developed jointly by the IAEA, the OECD Nuclear Energy Agency and the European Commission. The specific aims of the project include the development of representative and comparative data and datasets for preliminary costing for decommissioning. This paper will focus on presenting a technique to consider several representative input data in accordance with the ISDC structure and using the CERREX (Cost Estimation for Research Reactors in Excel) software developed by IAEA. (author)

  15. Cost analysis and estimating tools and techniques

    CERN Document Server

    Nussbaum, Daniel

    1990-01-01

    Changes in production processes reflect the technological advances permeat­ ing our products and services. U. S. industry is modernizing and automating. In parallel, direct labor is fading as the primary cost driver while engineering and technology related cost elements loom ever larger. Traditional, labor-based ap­ proaches to estimating costs are losing their relevance. Old methods require aug­ mentation with new estimating tools and techniques that capture the emerging environment. This volume represents one of many responses to this challenge by the cost analysis profession. The Institute of Cost Analysis (lCA) is dedicated to improving the effective­ ness of cost and price analysis and enhancing the professional competence of its members. We encourage and promote exchange of research findings and appli­ cations between the academic community and cost professionals in industry and government. The 1990 National Meeting in Los Angeles, jointly spo~sored by ICA and the National Estimating Society (NES),...

  16. Pain from the life cycle perspective: Evaluation and Measurement through psychophysical methods of category estimation and magnitude estimation.

    Science.gov (United States)

    Sousa, Fátima Aparecida Emm Faleiros; Silva, Talita de Cássia Raminelli da; Siqueira, Hilze Benigno de Oliveira Moura; Saltareli, Simone; Gomez, Rodrigo Ramon Falconi; Hortense, Priscilla

    2016-08-18

    to describe acute and chronic pain from the perspective of the life cycle. participants: 861 people in pain. The Multidimensional Pain Evaluation Scale (MPES) was used. in the category estimation method the highest descriptors of chronic pain for children/ adolescents were "Annoying" and for adults "Uncomfortable". The highest descriptors of acute pain for children/adolescents was "Complicated"; and for adults was "Unbearable". In magnitude estimation method, the highest descriptors of chronic pain was "Desperate" and for descriptors of acute pain was "Terrible". the MPES is a reliable scale it can be applied during different stages of development. descrever a dor aguda e a crônica na perspectiva do ciclo vital. Métodos: participaram 861 pessoas com dor. Foi utilizada a Escala Multidimensional de Avaliação da Dor (EMADOR). Resultados: no método da estimação de categoria o descritor da dor crônica de maior atribuição para crianças e adolescentes foi "Chata" e para adultos foi "Desconfortável". Os descritores de maior atribuição para dor aguda em crianças e adolescentes foram "Complicada" e em adultos "Insuportável". No método de estimação de magnitude, o descritor de maior atribuição na dor crônica foi "Atormentadora" e na dor aguda foi "Terrível". a EMADOR é uma escala confiável e pode ser utilizada nas diferentes etapas do desenvolvimento humano. la descripción del dolor agudo y crónico desde las perspectiva del ciclo de vida. participaron 861 personas con dolor. Se utilizó la Escala Multidimensional de Evaluación del Dolor (EMEDOR). en el método de estimación de categoría el descriptor de dolor crónico más alto para niños y adolescentes fue de Molesto y para adultos fue Incómodo. Los descriptores mayores de dolor agudo para niños y adolescentes fueron Complejo y para adultos Insoportable. En el método de estimación de magnitud, el mayor descriptor de dolor crónico fueron Atormentador y el mayor de dolor agudo fue Terrible

  17. Cost Estimating Cases: Educational Tools for Cost Analysts

    Science.gov (United States)

    1993-09-01

    only appropriate documentation should be provided. In other words, students should not submit all of the documentation possible using ACEIT , only that...case was their lack of understanding of the ACEIT software used to conduct the estimate. Specifically, many students misinterpreted the cost...estimating relationships (CERs) embedded in the 49 software. Additionally, few of the students were able to properly organize the ACEIT documentation output

  18. Cost estimate for electrostatically plugged cusp reactor

    International Nuclear Information System (INIS)

    Dolan, T.J.

    1977-01-01

    A preliminary design of an electrostatically plugged cusp reactor was presented in (UCRL-52142(1976)). The capital costs of the various components of this reactor are estimated and totaled for two different blanket configurations: one having an energy multiplication factor M = 1.2, and the other having M = 1.68. The unoptimized direct capital costs for these cases are found to be about 1400 and 950 $/kWe, respectively

  19. Direct magnitude estimates of speech intelligibility in dysarthria: effects of a chosen standard.

    Science.gov (United States)

    Weismer, Gary; Laures, Jacqueline S

    2002-06-01

    Direct magnitude estimation (DME) has been used frequently as a perceptual scaling technique in studies of the speech intelligibility of persons with speech disorders. The technique is typically used with a standard, or reference stimulus, chosen as a good exemplar of "midrange" intelligibility. In several published studies, the standard has been chosen subjectively, usually on the basis of the expertise of the investigators. The current experiment demonstrates that a fixed set of sentence-level utterances, obtained from 4 individuals with dysarthria (2 with Parkinson disease, 2 with traumatic brain injury) as well as 3 neurologically normal speakers, is scaled differently depending on the identity of the standard. Four different standards were used in the main experiment, three of which were judged qualitatively in two independent evaluations to be good exemplars of midrange intelligibility. Acoustic analyses did not reveal obvious differences between these four standards but suggested that the standard with the worst-scaled intelligibility had much poorer voice source characteristics compared to the other three standards. Results are discussed in terms of possible standardization of midrange intelligibility exemplars for DME experiments.

  20. Failing to Estimate the Costs of Offshoring

    DEFF Research Database (Denmark)

    Møller Larsen, Marcus

    2016-01-01

    This article investigates cost estimation errors in the context of offshoring. It is argued that an imprecise estimation of the costs related to implementing a firm activity in a foreign location has a negative impact on the process performance of that activity. Performance is deterred...... as operations are likely to be disrupted by managerial distraction and resource misallocation. It is also argued that this relationship is mitigated by the extent to which firms use modularity to coordinate the activity but worsened by the extent to which ongoing communication is used. The results, based...

  1. Social opportunity cost of capital: empirical estimates

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, S.

    1978-02-01

    This report develops estimates of the social-opportunity cost of public capital. The private and social costs of capital are found to diverge primarily because of the effects of corporate and personal income taxes. Following Harberger, the social-opportunity cost of capital is approximated by a weighted average of the returns to different classes of savers and investors where the weights are the flows of savings or investments in each class multiplied by the relevant elasticity. Estimates of these parameters are obtained and the social-opportunity cost of capital is determined to be in the range of 6.2 to 10.8%, depending upon the parameter values used. Uncertainty is found to affect the social-opportunity cost of capital in two ways. First, some allowance must be made for the chance of failure or at least of not realizing claims of a project's proponents. Second, a particular government project will change the expected variability of the returns to the government's entire portfolio of projects. In the absence of specific information about each project, the use of the economy-wide average default and risk adjustments is suggested. These are included in the empirical estimates reported. International capital markets make available private capital, the price of which is not distorted by the U.S. tax system. The inclusion of foreign sources slightly reduces the social-opportunity cost of capital. 21 references.

  2. Cost estimate of electricity produced by TPV

    Science.gov (United States)

    Palfinger, Günther; Bitnar, Bernd; Durisch, Wilhelm; Mayor, Jean-Claude; Grützmacher, Detlev; Gobrecht, Jens

    2003-05-01

    A crucial parameter for the market penetration of TPV is its electricity production cost. In this work a detailed cost estimate is performed for a Si photocell based TPV system, which was developed for electrically self-powered operation of a domestic heating system. The results are compared to a rough estimate of cost of electricity for a projected GaSb based system. For the calculation of the price of electricity, a lifetime of 20 years, an interest rate of 4.25% per year and maintenance costs of 1% of the investment are presumed. To determine the production cost of TPV systems with a power of 12-20 kW, the costs of the TPV components and 100 EUR kW-1el,peak for assembly and miscellaneous were estimated. Alternatively, the system cost for the GaSb system was derived from the cost of the photocells and from the assumption that they account for 35% of the total system cost. The calculation was done for four different TPV scenarios which include a Si based prototype system with existing technology (etasys = 1.0%), leading to 3000 EUR kW-1el,peak, an optimized Si based system using conventional, available technology (etasys = 1.5%), leading to 900 EUR kW-1el,peak, a further improved system with future technology (etasys = 5%), leading to 340 EUR kW-1el,peak and a GaSb based system (etasys = 12.3% with recuperator), leading to 1900 EUR kW-1el,peak. Thus, prices of electricity from 6 to 25 EURcents kWh-1el (including gas of about 3.5 EURcents kWh-1) were calculated and compared with those of fuel cells (31 EURcents kWh-1) and gas engines (23 EURcents kWh-1).

  3. Support to LANL: Cost estimation. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOE planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors

  4. Cost estimating Brayton and Stirling engines

    Science.gov (United States)

    Fortgang, H. R.

    1980-01-01

    Brayton and Stirling engines were analyzed for cost and selling price for production quantities ranging from 1000 to 400,000 units per year. Parts and components were subjected to indepth scrutiny to determine optimum manufacturing processes coupled with make or buy decisions on materials and small parts. Tooling and capital equipment costs were estimated for each detail and/or assembly. For low annual production volumes, the Brayton engine appears to have a lower cost and selling price than the Stirling Engine. As annual production quantities increase, the Stirling becomes a lower cost engine than the Brayton. Both engines could benefit cost wise if changes were made in materials, design and manufacturing process as annual production quantities increase.

  5. Phase-Based Adaptive Estimation of Magnitude-Squared Coherence Between Turbofan Internal Sensors and Far-Field Microphone Signals

    Science.gov (United States)

    Miles, Jeffrey Hilton

    2015-01-01

    A cross-power spectrum phase based adaptive technique is discussed which iteratively determines the time delay between two digitized signals that are coherent. The adaptive delay algorithm belongs to a class of algorithms that identifies a minimum of a pattern matching function. The algorithm uses a gradient technique to find the value of the adaptive delay that minimizes a cost function based in part on the slope of a linear function that fits the measured cross power spectrum phase and in part on the standard error of the curve fit. This procedure is applied to data from a Honeywell TECH977 static-engine test. Data was obtained using a combustor probe, two turbine exit probes, and far-field microphones. Signals from this instrumentation are used estimate the post-combustion residence time in the combustor. Comparison with previous studies of the post-combustion residence time validates this approach. In addition, the procedure removes the bias due to misalignment of signals in the calculation of coherence which is a first step in applying array processing methods to the magnitude squared coherence data. The procedure also provides an estimate of the cross-spectrum phase-offset.

  6. Cost Estimation for Research Reactor Decommissioning

    International Nuclear Information System (INIS)

    2013-01-01

    One of the IAEA's statutory objectives is to 'seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world'. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The purpose of this publication is to develop a costing methodology and a software tool in order to support cost estimation for research reactor decommissioning. The costing methodology is intended for the preliminary cost estimation stages for research reactor decommissioning with limited inventory data and other input data available. Existing experience in decommissioning costing is considered. As the basis for the cost calculation structure, the costing model uses the International Structure for Decommissioning Costing (ISDC) that is recommended by the IAEA, the Organisation for

  7. Residential outage cost estimation: Hong Kong

    International Nuclear Information System (INIS)

    Woo, C.K.; Ho, T.; Shiu, A.; Cheng, Y.S.; Horowitz, I.; Wang, J.

    2014-01-01

    Hong Kong has almost perfect electricity reliability, the result of substantial investments ultimately financed by electricity consumers who may be willing to accept lower reliability in exchange for lower bills. But consumers with high outage costs are likely to reject the reliability reduction. Our ordered-logit regression analysis of the responses by 1876 households to a telephone survey conducted in June 2013 indicates that Hong Kong residents exhibit a statistically-significant preference for their existing service reliability and rate. Moreover, the average residential cost estimate for a 1-h outage is US$45 (HK$350), topping the estimates reported in 10 of the 11 studies published in the last 10 years. The policy implication is that absent additional compelling evidence, Hong Kong should not reduce its service reliability. - Highlights: • Use a contingent valuation survey to obtain residential preferences for reliability. • Use an ordered logit analysis to estimate Hong Kong's residential outage costs. • Find high outage cost estimates that imply high reliability requirements. • Conclude that sans new evidence, Hong Kong should not reduce its reliability

  8. Unmanned Aerial Vehicles unique cost estimating requirements

    Science.gov (United States)

    Malone, P.; Apgar, H.; Stukes, S.; Sterk, S.

    Unmanned Aerial Vehicles (UAVs), also referred to as drones, are aerial platforms that fly without a human pilot onboard. UAVs are controlled autonomously by a computer in the vehicle or under the remote control of a pilot stationed at a fixed ground location. There are a wide variety of drone shapes, sizes, configurations, complexities, and characteristics. Use of these devices by the Department of Defense (DoD), NASA, civil and commercial organizations continues to grow. UAVs are commonly used for intelligence, surveillance, reconnaissance (ISR). They are also use for combat operations, and civil applications, such as firefighting, non-military security work, surveillance of infrastructure (e.g. pipelines, power lines and country borders). UAVs are often preferred for missions that require sustained persistence (over 4 hours in duration), or are “ too dangerous, dull or dirty” for manned aircraft. Moreover, they can offer significant acquisition and operations cost savings over traditional manned aircraft. Because of these unique characteristics and missions, UAV estimates require some unique estimating methods. This paper describes a framework for estimating UAV systems total ownership cost including hardware components, software design, and operations. The challenge of collecting data, testing the sensitivities of cost drivers, and creating cost estimating relationships (CERs) for each key work breakdown structure (WBS) element is discussed. The autonomous operation of UAVs is especially challenging from a software perspective.

  9. Estimating the cost of production stoppage

    Science.gov (United States)

    Delionback, L. M.

    1979-01-01

    Estimation model considers learning curve quantities, and time of break to forecast losses due to break in production schedule. Major parameters capable of predicting costs are number of units made prior to production sequence, length of production break, and slope of learning curve produced prior to break.

  10. Continuous estimates on the earthquake early warning magnitude by use of the near-field acceleration records

    Science.gov (United States)

    Li, Jun; Jin, Xing; Wei, Yongxiang; Zhang, Hongcai

    2013-10-01

    In this article, the seismic records of Japan's Kik-net are selected to measure the acceleration, displacement, and effective peak acceleration of each seismic record within a certain time after P wave, then a continuous estimation is given on earthquake early warning magnitude through statistical analysis method, and Wenchuan earthquake record is utilized to check the method. The results show that the reliability of earthquake early warning magnitude continuously increases with the increase of the seismic information, the biggest residual happens if the acceleration is adopted to fit earthquake magnitude, which may be caused by rich high-frequency components and large dispersion of peak value in acceleration record, the influence caused by the high-frequency components can be effectively reduced if the effective peak acceleration and peak displacement is adopted, it is estimated that the dispersion of earthquake magnitude obviously reduces, but it is easy for peak displacement to be affected by long-period drifting. In various components, the residual enlargement phenomenon at vertical direction is almost unobvious, thus it is recommended in this article that the effective peak acceleration at vertical direction is preferred to estimate earthquake early warning magnitude. Through adopting Wenchuan strong earthquake record to check the method mentioned in this article, it is found that this method can be used to quickly, stably, and accurately estimate the early warning magnitude of this earthquake, which shows that this method is completely applicable for earthquake early warning.

  11. Contingency Cost estimation for Research reactor Decommissioning

    International Nuclear Information System (INIS)

    Jin, Hyung Gon; Hong, Yun Jeong

    2016-01-01

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors

  12. Contingency Cost estimation for Research reactor Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Hong, Yun Jeong [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors.

  13. PROBLEMAS DE ESTIMACIÓN DE MAGNITUDES NO ALCANZABLES: ESTRATEGIAS Y ÉXITO EN LA RESOLUCIÓN (Unreachable Magnitude Estimation Problems: Strategies and Solving Success

    Directory of Open Access Journals (Sweden)

    Núria Gorgorió

    2013-03-01

    Full Text Available Llamamos problemas de Fermi a aquellos problemas que, siendo de difícil resolución, admiten una aproximación a su solución a base de romper el problema en partes más pequeñas y resolverlas por separado. En este artículo presentamos los problemas de estimación de magnitudes no alcanzables (PEMNA como un subconjunto de los problemas de Fermi. A partir de los datos recopilados en un estudio hecho con alumnos de 12 a 16 años, caracterizamos las distintas estrategias de resolución propuestas por estos y discutimos sobre la potencialidad de estas estrategias para resolver los problemas con éxito. Fermi problems are problems that, being difficult to solve, can be satisfactorily solved if they are broken down into smaller pieces that are solved separately. In this article, we present inconceivable magnitude estimation problems as a subset of Fermi problems. Based on data collected from a study carried out with 12 to 16 years old students, we describe the different strategies for solving the problems that were proposed by the students, and discuss the potential of these strategies to successfully solve the problems.

  14. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  15. Importance of funding in decommissioning cost estimates

    International Nuclear Information System (INIS)

    Mingst, B.C.

    1987-01-01

    Decommissioning cost estimates have been made by several study groups for the decommissioning of pressurized-water and boiling-water nuclear power stations. The results of these studies are comparable when corrected for inflation and the differences in contingency factors applied by the study groups. The estimated dismantling costs differ far less than a factor of 2 in all cases, despite the design differences found in the plants that were studied. An analysis of the different methods available for funding the dismantling of these facilities shows the much stronger effect that the choice of funding methods has on the net cost of decommissioning. The total cost of dismantling may vary more than a factor of 4 from one funding method to another, assuming current or recent historical inflation rates. The funding methods evaluated include sinking funds, deposits, negative-salvage value depreciation, and insurance. These funding methods are taken from the NRC's Notice of Proposed Rulemaking description of acceptable funding methods. The funding analysis for this study was performed using the DECOST-86 computer code. The evaluation of funding options for a nuclear facility, and the appropriate choice of the funding method best for that facility, are found to be more important than detailed engineering studies in determining the net cost of decommissioning during the early portions of the plant's operating lifetime

  16. Rapid estimation of the moment magnitude of the 2011 off the Pacific coast of Tohoku earthquake from coseismic strain steps

    Science.gov (United States)

    Itaba, S.; Matsumoto, N.; Kitagawa, Y.; Koizumi, N.

    2012-12-01

    The 2011 off the Pacific coast of Tohoku earthquake, of moment magnitude (Mw) 9.0, occurred at 14:46 Japan Standard Time (JST) on March 11, 2011. The coseismic strain steps caused by the fault slip of this earthquake were observed in the Tokai, Kii Peninsula and Shikoku by the borehole strainmeters which were carefully set by Geological Survey of Japan, AIST. Using these strain steps, we estimated a fault model for the earthquake on the boundary between the Pacific and North American plates. Our model, which is estimated only from several minutes' strain data, is largely consistent with the final fault models estimated from GPS and seismic wave data. The moment magnitude can be estimated about 6 minutes after the origin time, and 4 minutes after wave arrival. According to the fault model, the moment magnitude of the earthquake is 8.7. On the other hand, based on the seismic wave, the prompt report of the magnitude which the Japan Meteorological Agency announced just after earthquake occurrence was 7.9. Generally coseismic strain steps are considered to be less reliable than seismic waves and GPS data. However our results show that the coseismic strain steps observed by the borehole strainmeters, which were carefully set and monitored, can be relied enough to decide the earthquake magnitude precisely and rapidly. In order to grasp the magnitude of a great earthquake earlier, several methods are now being suggested to reduce the earthquake disasters including tsunami. Our simple method of using strain steps is one of the strong methods for rapid estimation of the magnitude of great earthquakes.

  17. Estimation of 18FDG doses's cost

    International Nuclear Information System (INIS)

    Hamza, Fatma; Amouri, W.; Jardak, I.; Kallel, F.; Charfeddine, S.; Guermazi, F.

    2013-01-01

    The cyclotron facility, essentially for medical use, is far from being a simple establishment of a dedicated device to accelerate particles producing a beta plus emitter radioelement. The cyclotron site encompasses more over all necessary equipments for the production and the quality control of considered radiotracer that 18 FDG is just one example. This facility is subject to strict standards in terms of radiopharmaceutical production, radiation level, pressure level and airflow resulting in the production of a drug submitted to the MA (Marketing Authorization). These multiple factors directly influence the final cost of the dose that remains to be reachable by the patient. The aim of this work is to estimate the cost of a dose of 18 FDG to ensure financial viability of the project while accessible to the patient. The cost of the facility will entail the following: buildings and utilities, equipment and operational cost. This calculation is possible only if we define in advance the type of cyclotron, which is bound to the market needs in particular the number of PET facilities, the number of scans per day and the radioactive decay of radioelement. Our study represents a simulation that considers some hypothesis. We assumed that the cyclotron is installed in Sousse and that the PET facilities number (positon emission tomography) is 6 in which 4 are located 2 hours away. For a PET scan, the average dose per patient is about 350 MBq (5 MBq/kg) and the exam duration is about 45 minutes. Each center performs 10 tests per day. In terms of fees, we considered device and building's cost, facility amortization, consumables (target, marking accessories), maintenance, remuneration expense and the annual electricity consumption. All our calculations have been reported to the number of working days per year. The estimates were made outside the customs duties and technical assistance that may last up to 2 years. Requirements and needs were estimated at 5.4 curies per day. For

  18. IDC reengineering Phase 2 & 3 US industry standard cost estimate summary

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Huelskamp, Robert M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-01-01

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

  19. Magnitude, distribution, and estimated level of underreporting of acute gastroenteritis in Jamaica.

    Science.gov (United States)

    Fletcher, Stephanie M; Lewis-Fuller, Eva; Williams, Hank; Miller, Zahra; Scarlett, Henroy P; Cooper, Collin; Gordon-Johnson, Kelly-Ann; Vickers, Ivan; Shaw, Karen; Wellington, Iyanna; Thame, Jennifer; Pérez, Enrique; Indar, Lisa

    2013-12-01

    Jamaica is the third largest island in the Caribbean. The epidemiology of acute gastroenteritis (AGE) is important to Jamaica, particularly in the areas of health, tourism, and because of the potential impact on the local workforce and the economy. Data collected by the National Surveillance Unit on the prevalence of AGE transmitted by food are not accurate. To determine the true magnitude, risk factors, and the extent of underreporting of AGE in Jamaica, we conducted a cross-sectional, population-based retrospective survey during the periods of 21 February-7 March and 14-27 June 2009, corresponding to high- and low-AGE season respectively. Of the total 1,920 persons selected randomly by a multistage cluster-sampling process, 1,264 responded (response rate 65.8%). Trained interviewers administered a standardized, validated questionnaire during face-to-face interviews. The overall prevalence of self-reported AGE was 4.0% (95% CI 2.9-5.1) at a rate of 0.5 episodes/per person-year. The highest monthly prevalence of AGE (14.6%) was found among the 1-4 year(s) age-group and the lowest (2.1%) among the 25-44 years age-group. Of the 18 cases (36%) who sought medical care, 11% were hospitalized, 33% were treated with antibiotics, and 66.7% received oral rehydration fluids. Only 2 cases who sought medical care reportedly submitted stool specimens. The mean duration of diarrhoea was 3.1 days, which resulted in a mean loss of 4 productive days, with over half of the cases requiring someone to care for them. The burden of syndromic AGE for 2009 was extrapolated to be 122,711 cases, showing an underreporting factor of 58.9. For every laboratory-confirmed AGE case, it was estimated that 383 more cases were occurring in the population. This research confirms that the prevalence of AGE is underreported in Jamaica and not being adequately detected by the current surveillance system. The components of the integrated surveillance system for AGE in Jamaica, particularly the laboratory

  20. The Cognitive Estimation Task Is Nonunitary: Evidence for Multiple Magnitude Representation Mechanisms Among Normative and ADHD College Students

    Directory of Open Access Journals (Sweden)

    Sarit Ashkenazi

    2017-02-01

    Full Text Available There is a current debate on whether the cognitive system has a shared representation for all magnitudes or whether there are unique representations. To investigate this question, we used the Biber cognitive estimation task. In this task, participants were asked to provide estimates for questions such as, “How many sticks of spaghetti are in a package?” The task uses different estimation categories (e.g., time, numerical quantity, distance, and weight to look at real-life magnitude representations. Experiment 1 assessed (N = 95 a Hebrew version of the Biber Cognitive Estimation Task and found that different estimation categories had different relations, for example, weight, time, and distance shared variance, but numerical estimation did not. We suggest that numerical estimation does not require the use of measurement in units, hence, it represents a more “pure” numerical estimation. Experiment 2 found that different factors explain individual abilities in different estimation categories. For example, numerical estimation was predicted by preverbal innate quantity understanding (approximate number sense and working memory, whereas time estimations were supported by IQ. These results demonstrate that cognitive estimation is not a unified construct.

  1. Spreadsheet tool for estimating noise reduction costs

    International Nuclear Information System (INIS)

    Frank, L.; Senden, V.; Leszczynski, Y.

    2009-01-01

    The Northeast Capital Industrial Association (NCIA) represents industry in Alberta's industrial heartland. The organization is in the process of developing a regional noise management plan (RNMP) for their member companies. The RNMP includes the development of a noise reduction cost spreadsheet tool to conduct reviews of practical noise control treatments available for individual plant equipment, inclusive of ranges of noise attenuation achievable, which produces a budgetary prediction of the installed cost of practical noise control treatments. This paper discussed the noise reduction cost spreadsheet tool, with particular reference to noise control best practices approaches and spreadsheet tool development such as prerequisite, assembling data required, approach, and unit pricing database. Use and optimization of the noise reduction cost spreadsheet tool was also discussed. It was concluded that the noise reduction cost spreadsheet tool is an easy interactive tool to estimate implementation costs related to different strategies and options of noise control mitigating measures and was very helpful in gaining insight for noise control planning purposes. 2 tabs.

  2. Cost estimate of bovine tuberculosis to Ethiopia.

    Science.gov (United States)

    Tschopp, Rea; Hattendorf, Jan; Roth, Felix; Choudhury, Adnan Ali Khan; Choudhoury, Adnan; Shaw, Alexandra; Aseffa, Abraham; Zinsstag, Jakob

    2013-01-01

    While bovine tuberculosis (BTB) has been eliminated in some industrialized countries, it prevails worldwide, particularly in Africa. In Ethiopia, BTB is prevalent as numerous studies have shown its occurrence in livestock and in abattoirs but it has not been demonstrated in wildlife and only very few cases have been found in humans. The objective of this study is to estimate the cost of BTB to Ethiopia with the aim of informing Ethiopian policy on options for BTB control. BTB in livestock affects both animal productivity and herd demographic composition. The Livestock Development Planning System (LDPS2, FAO) was modified to allow for stochastic simulation of parameters. We performed an incremental cost of disease analysis, comparing livestock production with and without BTB. For the rural scenario we considered an endemically stable 4 % comparative intradermal test (CIDT) prevalence and for the urban scenario an endemically stable 32 % CIDT prevalence among cattle. The net present value of rural Ethiopian livestock products in 2005 is estimated at 65.7 billion (thousand million) Ethiopian Birr (95 % Confidence Interval (CI) 53.8-77.7 billion Birr), which is the equivalent of 7.5 billion US$ (95 %CI 6.1-8.9 billion US$) at a rate of 8.7 Birr per US$ in 2005. The cost of BTB ranges from 646 million Birr (75.2 million US$) in 2005 to 3.1 Billion Birr in 2011 (358 million US$) but is within the range of uncertainty of our estimate and can thus not be distinguished from zero. The cost of disease in the urban livestock production ranges from 5 to 42 million Birr (500,000-4.9 million US$) between 2005 and 2011 but is also within the range of uncertainty of our estimate. Our study shows no measurable loss in asset value or cost of disease due to BTB in rural and urban production systems in Ethiopia. This does not mean that there is not a real cost of disease, but the variability of the productivity parameters and prices are high and would require more precise estimates

  3. Estimating Maintenance Cost for Web Applications

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the issue of determining a method for estimating maintenance costs for web applications. The current state of research in the field of web application maintenance is summarized and leading theories and results are highlighted. The cost of web maintenance is determined by the number of man-hours invested in maintenance tasks. Web maintenance tasks are categorized into content maintenance and technical maintenance. Research is centered on analyzing technical maintenance tasks. The research hypothesis is formulated on the assumption that the number of man-hours invested in maintenance tasks can be assessed based on the web application’s user interaction level, complexity and content update effort. Data regarding the costs of maintenance tasks is collected from 24 maintenance projects implemented by a web development company that tackles a wide area of web applications. Homogeneity and diversity of collected data is submitted for debate by presenting a sample of the data and depicting the overall size and comprehensive nature of the entire dataset. A set of metrics dedicated to estimating maintenance costs in web applications is defined based on conclusions formulated by analyzing the collected data and the theories and practices dominating the current state of research. Metrics are validated with regards to the initial research hypothesis. Research hypothesis are validated and conclusions are formulated on the topic of estimating the maintenance cost of web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  4. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  5. AES, Automated Construction Cost Estimation System

    International Nuclear Information System (INIS)

    Holder, D.A.

    1995-01-01

    A - Description of program or function: AES (Automated Estimating System) enters and updates the detailed cost, schedule, contingency, and escalation information contained in a typical construction or other project cost estimates. It combines this information to calculate both un-escalated and escalated and cash flow values for the project. These costs can be reported at varying levels of detail. AES differs from previous versions in at least the following ways: The schedule is entered at the WBS-Participant, Activity level - multiple activities can be assigned to each WBS-Participant combination; the spending curve is defined at the schedule activity level and a weighing factor is defined which determines percentage of cost for the WBS-Participant applied to the schedule activity; Schedule by days instead of Fiscal Year/Quarter; Sales Tax is applied at the Line Item Level- a sales tax codes is selected to indicate Material, Large Single Item, or Professional Services; a 'data filter' has been added to allow user to define data the report is to be generated for. B - Method of solution: Average Escalation Rate: The average escalation for a Bill of is calculated in three steps. 1. A table of quarterly escalation factors is calculated based on the base fiscal year and quarter of the project entered in the estimate record and the annual escalation rates entered in the Standard Value File. 2. The percentage distribution of costs by quarter for the Bill of Material is calculated based on the schedule entered and the curve type. 3. The percent in each fiscal year and quarter in the distribution is multiplied by the escalation factor for the fiscal year and quarter. The sum of these results is the average escalation rate for that Bill of Material. Schedule by curve: The allocation of costs to specific time periods is dependent on three inputs, starting schedule date, ending schedule date, and the percentage of costs allocated to each quarter. Contingency Analysis: The

  6. Advanced Composite Air Frame Life Cycle Cost Estimating

    Science.gov (United States)

    2014-06-19

    the ACCA based on the cost . This cost analysis takes into account the increased performance parameters of the new airframe structure. This research...20 Advanced Composite Cargo Aircraft ( ACCA ) ..........................................................23 viii Cost Estimation...establishing the procurement strategies and life cycle cost (LCC) model cost estimations. The current LCC models do not take into account the potential cost

  7. A Concurrent Mixed Methods Approach to Examining the Quantitative and Qualitative Meaningfulness of Absolute Magnitude Estimation Scales in Survey Research

    Science.gov (United States)

    Koskey, Kristin L. K.; Stewart, Victoria C.

    2014-01-01

    This small "n" observational study used a concurrent mixed methods approach to address a void in the literature with regard to the qualitative meaningfulness of the data yielded by absolute magnitude estimation scaling (MES) used to rate subjective stimuli. We investigated whether respondents' scales progressed from less to more and…

  8. Cost estimate for a proposed GDF Suez LNG testing program

    Energy Technology Data Exchange (ETDEWEB)

    Blanchat, Thomas K.; Brady, Patrick Dennis; Jernigan, Dann A.; Luketa, Anay Josephine; Nissen, Mark R.; Lopez, Carlos; Vermillion, Nancy; Hightower, Marion Michael

    2014-02-01

    At the request of GDF Suez, a Rough Order of Magnitude (ROM) cost estimate was prepared for the design, construction, testing, and data analysis for an experimental series of large-scale (Liquefied Natural Gas) LNG spills on land and water that would result in the largest pool fires and vapor dispersion events ever conducted. Due to the expected cost of this large, multi-year program, the authors utilized Sandia's structured cost estimating methodology. This methodology insures that the efforts identified can be performed for the cost proposed at a plus or minus 30 percent confidence. The scale of the LNG spill, fire, and vapor dispersion tests proposed by GDF could produce hazard distances and testing safety issues that need to be fully explored. Based on our evaluations, Sandia can utilize much of our existing fire testing infrastructure for the large fire tests and some small dispersion tests (with some modifications) in Albuquerque, but we propose to develop a new dispersion testing site at our remote test area in Nevada because of the large hazard distances. While this might impact some testing logistics, the safety aspects warrant this approach. In addition, we have included a proposal to study cryogenic liquid spills on water and subsequent vaporization in the presence of waves. Sandia is working with DOE on applications that provide infrastructure pertinent to wave production. We present an approach to conduct repeatable wave/spill interaction testing that could utilize such infrastructure.

  9. Applying coda envelope measurements to local and regional waveforms for stable estimates of magnitude, source spectra and energy

    International Nuclear Information System (INIS)

    Hofstetter, R.; Mayeda, K.; Rodgers, A.; Walter, W.

    1999-01-01

    Magnitude estimation forms an integral part in any seismic monitoring endeavor. For monitoring compliance of the Comprehensive Nuclear-Test-Ban Treaty, regional seismic discriminants are often functions of magnitude such as m(sub b):M(sub 0) high-to-low spectral ratios, and nuclear yield estimation. For small-to-moderate magnitude events that cannot be studied by a large regional or global network of stations, there is a need for stable magnitudes that can be obtained from as few as one station. To date, magnitudes based on coda envelopes are by far the most stable because of the coda's averaging properties. Unlike conventional magnitudes which utilize the direct phases such as P (P(sub n), P(sub g)) or S (S(sub n), L(sub g)), or M(sub g), a coda envelope magnitude is not as sensitive to the undesirable effects of source radiation pattern, 3-D path heterogeneity, and constructive/destructive interference near the recording site. The stability of the coda comes from a time-domain measurement made over a large portion of the seismogram thereby averaging over the scattered wavefield. This approach has been applied to earthquakes in the western United States where it was found that a single-station coda magnitude was approximately equivalent to an average over a 64 station network which used only the direct waves such as L(sub g) (Mayeda and Walter, JGR, 1996). In this paper we describe in detail our calibration procedure starting with a broadband recording, correlation with independent moment estimates, formation of narrowband envelopes, coda envelope fitting with synthetics, and finally the resultant moment-rate spectra. Our procedure accounts for all propagation, site, and S-to-coda transfer function effects. The resultant coda-derived moment-rate spectra are then used to estimate seismic moment (M(sub o)), narrowband magnitudes such as m(sub b) or M(sub L), and total seismic energy. For the eastern Mediterranean region a preliminary study was completed for

  10. Estimated generic prices of cancer medicines deemed cost-ineffective in England: a cost estimation analysis.

    Science.gov (United States)

    Hill, Andrew; Redd, Christopher; Gotham, Dzintars; Erbacher, Isabelle; Meldrum, Jonathan; Harada, Ryo

    2017-01-20

    The aim of this study was to estimate lowest possible treatment costs for four novel cancer drugs, hypothesising that generic manufacturing could significantly reduce treatment costs. This research was carried out in a non-clinical research setting using secondary data. There were no human participants in the study. Four drugs were selected for the study: bortezomib, dasatinib, everolimus and gefitinib. These medications were selected according to their clinical importance, novel pharmaceutical actions and the availability of generic price data. Target costs for treatment were to be generated for each indication for each treatment. The primary outcome measure was the target cost according to a production cost calculation algorithm. The secondary outcome measure was the target cost as the lowest available generic price; this was necessary where export data were not available to generate an estimate from our cost calculation algorithm. Other outcomes included patent expiry dates and total eligible treatment populations. Target prices were £411 per cycle for bortezomib, £9 per month for dasatinib, £852 per month for everolimus and £10 per month for gefitinib. Compared with current list prices in England, these target prices would represent reductions of 74-99.6%. Patent expiry dates were bortezomib 2014-22, dasatinib 2020-26, everolimus 2019-25 and gefitinib 2017. The total global eligible treatment population in 1 year is 769 736. Our findings demonstrate that affordable drug treatment costs are possible for novel cancer drugs, suggesting that new therapeutic options can be made available to patients and doctors worldwide. Assessing treatment cost estimations alongside cost-effectiveness evaluations is an important area of future research. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  11. Food waste in South Africa: Understanding the magnitude, water footprint and cost

    CSIR Research Space (South Africa)

    Oelofse, Suzanna HH

    2014-11-01

    Full Text Available by type to water loss as a result of food waste Table 2: Contribution of food commodities to water loss as a result of food waste THE VISION ZERO WASTE HANDBOOK 67 8 FOOD WASTE IN SOUTH AFRICA that cereals (32%), meat (26%) and fruit and vegetables (24... impact of fruit and vegetables are the highest (42%) followed by meat (32%)( Nahman and de Lange, 2013), cereals are contributing the most to water loss (32%) followed by meat (26%) (Figure 3). It is therefore evident that actions to reduce cost vs...

  12. Grizzly Bear Noninvasive Genetic Tagging Surveys: Estimating the Magnitude of Missed Detections.

    Directory of Open Access Journals (Sweden)

    Jason T Fisher

    Full Text Available Sound wildlife conservation decisions require sound information, and scientists increasingly rely on remotely collected data over large spatial scales, such as noninvasive genetic tagging (NGT. Grizzly bears (Ursus arctos, for example, are difficult to study at population scales except with noninvasive data, and NGT via hair trapping informs management over much of grizzly bears' range. Considerable statistical effort has gone into estimating sources of heterogeneity, but detection error-arising when a visiting bear fails to leave a hair sample-has not been independently estimated. We used camera traps to survey grizzly bear occurrence at fixed hair traps and multi-method hierarchical occupancy models to estimate the probability that a visiting bear actually leaves a hair sample with viable DNA. We surveyed grizzly bears via hair trapping and camera trapping for 8 monthly surveys at 50 (2012 and 76 (2013 sites in the Rocky Mountains of Alberta, Canada. We used multi-method occupancy models to estimate site occupancy, probability of detection, and conditional occupancy at a hair trap. We tested the prediction that detection error in NGT studies could be induced by temporal variability within season, leading to underestimation of occupancy. NGT via hair trapping consistently underestimated grizzly bear occupancy at a site when compared to camera trapping. At best occupancy was underestimated by 50%; at worst, by 95%. Probability of false absence was reduced through successive surveys, but this mainly accounts for error imparted by movement among repeated surveys, not necessarily missed detections by extant bears. The implications of missed detections and biased occupancy estimates for density estimation-which form the crux of management plans-require consideration. We suggest hair-trap NGT studies should estimate and correct detection error using independent survey methods such as cameras, to ensure the reliability of the data upon which species

  13. Grizzly Bear Noninvasive Genetic Tagging Surveys: Estimating the Magnitude of Missed Detections.

    Science.gov (United States)

    Fisher, Jason T; Heim, Nicole; Code, Sandra; Paczkowski, John

    2016-01-01

    Sound wildlife conservation decisions require sound information, and scientists increasingly rely on remotely collected data over large spatial scales, such as noninvasive genetic tagging (NGT). Grizzly bears (Ursus arctos), for example, are difficult to study at population scales except with noninvasive data, and NGT via hair trapping informs management over much of grizzly bears' range. Considerable statistical effort has gone into estimating sources of heterogeneity, but detection error-arising when a visiting bear fails to leave a hair sample-has not been independently estimated. We used camera traps to survey grizzly bear occurrence at fixed hair traps and multi-method hierarchical occupancy models to estimate the probability that a visiting bear actually leaves a hair sample with viable DNA. We surveyed grizzly bears via hair trapping and camera trapping for 8 monthly surveys at 50 (2012) and 76 (2013) sites in the Rocky Mountains of Alberta, Canada. We used multi-method occupancy models to estimate site occupancy, probability of detection, and conditional occupancy at a hair trap. We tested the prediction that detection error in NGT studies could be induced by temporal variability within season, leading to underestimation of occupancy. NGT via hair trapping consistently underestimated grizzly bear occupancy at a site when compared to camera trapping. At best occupancy was underestimated by 50%; at worst, by 95%. Probability of false absence was reduced through successive surveys, but this mainly accounts for error imparted by movement among repeated surveys, not necessarily missed detections by extant bears. The implications of missed detections and biased occupancy estimates for density estimation-which form the crux of management plans-require consideration. We suggest hair-trap NGT studies should estimate and correct detection error using independent survey methods such as cameras, to ensure the reliability of the data upon which species management and

  14. Estimating the magnitude of female genital mutilation/cutting in Norway: an extrapolation model.

    Science.gov (United States)

    Ziyada, Mai M; Norberg-Schulz, Marthe; Johansen, R Elise B

    2016-02-02

    With emphasis on policy implications, the main objective of this study was to estimate the numbers of two main groups affected by FGM/C in Norway: 1) those already subjected to FGM/C and therefore potentially in need for health care and 2) those at risk of FGM/C and consequently the target of preventive and protective measures. Special attention has been paid to type III as it is associated with more severe complications. Register data from Statistics Norway (SSB) was combined with population-based survey data on FGM/C in the women/girls' countries of origin. As of January 1(st) 2013, there were 44,467 first and second-generation female immigrants residing in Norway whose country of origin is one of the 29 countries where FGM/C is well documented. About 40 pct. of these women and girls are estimated to have already been subjected to FGM/C prior to immigration to Norway. Type III is estimated in around 50 pct. of those already subjected to FGM/C. Further, a total of 15,500 girls are identified as potentially at risk, out of which an approximate number of girls ranging between 3000 and 7900 are estimated to be at risk of FGM/C. Reliable estimates on FGM/C are important for evidence-based policies. The study findings indicate that about 17,300 women and girls in Norway can be in need of health care, in particular the 9100 who are estimated to have type III. Preventive and protective measures are also needed to protect girls at risk (3000 to 7900) from being subjected to FGM/C. Nevertheless, as there are no appropriate tools at the moment that can single these girls out of all who are potentially at risk, all girls in the potentially at risk group (15,500) should be targeted with preventive measures.

  15. Estimated Annual Maintenance Costs for Educational Facilities in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    Global estimated annual costs for undertaking basic maintenance of all educational facilities in Eritrea.......Global estimated annual costs for undertaking basic maintenance of all educational facilities in Eritrea....

  16. A Probabilistic Cost Estimation Model for Unexploded Ordnance Removal

    National Research Council Canada - National Science Library

    Poppe, Peter

    1999-01-01

    ...) contaminated sites that the services must decontaminate. Existing models for estimating the cost of UXO removal often require a high level of expertise and provide only a point estimate for the costs...

  17. Development of a simple estimation tool for LMFBR construction cost

    International Nuclear Information System (INIS)

    Yoshida, Kazuo; Kinoshita, Izumi

    1999-01-01

    A simple tool for estimating the construction costs of liquid-metal-cooled fast breeder reactors (LMFBRs), 'Simple Cost' was developed in this study. Simple Cost is based on a new estimation formula that can reduce the amount of design data required to estimate construction costs. Consequently, Simple cost can be used to estimate the construction costs of innovative LMFBR concepts for which detailed design has not been carried out. The results of test calculation show that Simple Cost provides cost estimations equivalent to those obtained with conventional methods within the range of plant power from 325 to 1500 MWe. Sensitivity analyses for typical design parameters were conducted using Simple Cost. The effects of four major parameters - reactor vessel diameter, core outlet temperature, sodium handling area and number of secondary loops - on the construction costs of LMFBRs were evaluated quantitatively. The results show that the reduction of sodium handling area is particularly effective in reducing construction costs. (author)

  18. Cost estimates supporting West Valley DEIS

    International Nuclear Information System (INIS)

    Pirro, J.

    1981-01-01

    An Environmental Impact Statement (EIS) is being prepared which considers alternate means for solidifying the high level liquid wastes (HLLW) at the Western New York Nuclear Service Center (WNYNSC). For this purpose three basic scenarios were considered. In the first scenario, the HLLW is converted into terminal waste form of borosilicate glass. Before vitrification, the non-radioactive chemical salts are separated from the radioactive and transuranic (TRU) constituents in the HLLW. In the second scenario, the HLLW is converted into an intermediate form-fused salt. The stored HLLW is dewatered and melted and the solids are transported to a Department of Energy (DOE) site. The fused salt will be processed of the DOE site at a later date where it will be converted to a vitrified form in a facility that will be constructed to treat HLLW stored at that site. The vitrified salt will be eventually removed for permanent disposal at a Federal repository. In the third scenario, the HLLW is solidified in the existing HLLW storage tanks with cement and returned for on-site disposal in the existing tanks or additional tanks as needed to accommodate the volume. To support the EIS, the costs to accomplish each of the alternatives is provided. The purpose of this cost estimate is to provide a common basis to evaluate the expenditures required to immobilize the HLLW presently stored at the WNYNSC

  19. Order-of-magnitude physics of neutron stars. Estimating their properties from first principles

    Energy Technology Data Exchange (ETDEWEB)

    Reisenegger, Andreas; Zepeda, Felipe S. [Pontificia Universidad Catolica de Chile, Instituto de Astrofisica, Facultad de Fisica, Macul (Chile)

    2016-03-15

    We use basic physics and simple mathematics accessible to advanced undergraduate students to estimate the main properties of neutron stars. We set the stage and introduce relevant concepts by discussing the properties of ''everyday'' matter on Earth, degenerate Fermi gases, white dwarfs, and scaling relations of stellar properties with polytropic equations of state. Then, we discuss various physical ingredients relevant for neutron stars and how they can be combined in order to obtain a couple of different simple estimates of their maximum mass, beyond which they would collapse, turning into black holes. Finally, we use the basic structural parameters of neutron stars to briefly discuss their rotational and electromagnetic properties. (orig.)

  20. ICPP tank farm closure study. Volume III: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option

  1. Increased accuracy of cost-estimation using product configuration systems

    DEFF Research Database (Denmark)

    Rasmussen, Jeppe Bredahl; Hvam, Lars; Mortensen, Niels Henrik

    This article describes an approach for utilizing Product Configuration Systems (PCS) for quantifying project costs in project-based companies. It presents a case study demonstrating a method of quantifying costs in a way that makes it possible to configure cost- and time estimates. Piecework costs......, material costs and sub-supplier costs are used as principle cost elements and linked to structural and process elements to facilitate configuration. The cost data are used by the PCS to generate fast and accurate cost-estimates, quotations, time estimates and cost summaries. The described cost...... quantification principles have been used in a Scandinavian SME (Small and Medium-sized Enterprise) since the 90’s, but have since 2011 been adopted to be used in a configuration system. A longitudinal case study was conducted to compare cost and time-estimation accuracy before and after implementation. We...

  2. Estimation of the Demand for Hospital Care After a Possible High-Magnitude Earthquake in the City of Lima, Peru.

    Science.gov (United States)

    Bambarén, Celso; Uyen, Angela; Rodriguez, Miguel

    2017-02-01

    Introduction A model prepared by National Civil Defense (INDECI; Lima, Peru) estimated that an earthquake with an intensity of 8.0 Mw in front of the central coast of Peru would result in 51,019 deaths and 686,105 injured in districts of Metropolitan Lima and Callao. Using this information as a base, a study was designed to determine the characteristics of the demand for treatment in public hospitals and to estimate gaps in care in the hours immediately after such an event. A probabilistic model was designed that included the following variables: demand for hospital care; time of arrival at the hospitals; type of medical treatment; reason for hospital admission; and the need for specialized care like hemodialysis, blood transfusions, and surgical procedures. The values for these variables were obtained through a literature search of the databases of the MEDLINE medical bibliography, the Cochrane and SciELO libraries, and Google Scholar for information on earthquakes over the last 30 years of over magnitude 6.0 on the moment magnitude scale. If a high-magnitude earthquake were to occur in Lima, it was estimated that between 23,328 and 178,387 injured would go to hospitals, of which between 4,666 and 121,303 would require inpatient care, while between 18,662 and 57,084 could be treated as outpatients. It was estimated that there would be an average of 8,768 cases of crush syndrome and 54,217 cases of other health problems. Enough blood would be required for 8,761 wounded in the first 24 hours. Furthermore, it was expected that there would be a deficit of hospital beds and operating theaters due to the high demand. Sudden and violent disasters, such as earthquakes, represent significant challenges for health systems and services. This study shows the deficit of preparation and capacity to respond to a possible high-magnitude earthquake. The study also showed there are not enough resources to face mega-disasters, especially in large cities. Bambarén C , Uyen A

  3. CALIBRATION OF THE MEARTH PHOTOMETRIC SYSTEM: OPTICAL MAGNITUDES AND PHOTOMETRIC METALLICITY ESTIMATES FOR 1802 NEARBY M-DWARFS

    International Nuclear Information System (INIS)

    Dittmann, Jason A.; Irwin, Jonathan M.; Charbonneau, David; Newton, Elisabeth R.

    2016-01-01

    The MEarth Project is a photometric survey systematically searching the smallest stars near the Sun for transiting rocky planets. Since 2008, MEarth has taken approximately two million images of 1844 stars suspected to be mid-to-late M dwarfs. We have augmented this survey by taking nightly exposures of photometric standard stars and have utilized this data to photometrically calibrate the MEarth system, identify photometric nights, and obtain an optical magnitude with 1.5% precision for each M dwarf system. Each optical magnitude is an average over many years of data, and therefore should be largely immune to stellar variability and flaring. We combine this with trigonometric distance measurements, spectroscopic metallicity measurements, and 2MASS infrared magnitude measurements in order to derive a color–magnitude–metallicity relation across the mid-to-late M dwarf spectral sequence that can reproduce spectroscopic metallicity determinations to a precision of 0.1 dex. We release optical magnitudes and metallicity estimates for 1567 M dwarfs, many of which did not have an accurate determination of either prior to this work. For an additional 277 stars without a trigonometric parallax, we provide an estimate of the distance, assuming solar neighborhood metallicity. We find that the median metallicity for a volume-limited sample of stars within 20 pc of the Sun is [Fe/H] = −0.03 ± 0.008, and that 29/565 of these stars have a metallicity of [Fe/H] = −0.5 or lower, similar to the low-metallicity distribution of nearby G dwarfs. When combined with the results of ongoing and future planet surveys targeting these objects, the metallicity estimates presented here will be important for assessing the significance of any putative planet–metallicity correlation

  4. CALIBRATION OF THE MEARTH PHOTOMETRIC SYSTEM: OPTICAL MAGNITUDES AND PHOTOMETRIC METALLICITY ESTIMATES FOR 1802 NEARBY M-DWARFS

    Energy Technology Data Exchange (ETDEWEB)

    Dittmann, Jason A.; Irwin, Jonathan M.; Charbonneau, David; Newton, Elisabeth R. [Harvard-Smithsonian Center for Astrophysics, 60 Garden St., Cambridge, MA 02138 (United States)

    2016-02-20

    The MEarth Project is a photometric survey systematically searching the smallest stars near the Sun for transiting rocky planets. Since 2008, MEarth has taken approximately two million images of 1844 stars suspected to be mid-to-late M dwarfs. We have augmented this survey by taking nightly exposures of photometric standard stars and have utilized this data to photometrically calibrate the MEarth system, identify photometric nights, and obtain an optical magnitude with 1.5% precision for each M dwarf system. Each optical magnitude is an average over many years of data, and therefore should be largely immune to stellar variability and flaring. We combine this with trigonometric distance measurements, spectroscopic metallicity measurements, and 2MASS infrared magnitude measurements in order to derive a color–magnitude–metallicity relation across the mid-to-late M dwarf spectral sequence that can reproduce spectroscopic metallicity determinations to a precision of 0.1 dex. We release optical magnitudes and metallicity estimates for 1567 M dwarfs, many of which did not have an accurate determination of either prior to this work. For an additional 277 stars without a trigonometric parallax, we provide an estimate of the distance, assuming solar neighborhood metallicity. We find that the median metallicity for a volume-limited sample of stars within 20 pc of the Sun is [Fe/H] = −0.03 ± 0.008, and that 29/565 of these stars have a metallicity of [Fe/H] = −0.5 or lower, similar to the low-metallicity distribution of nearby G dwarfs. When combined with the results of ongoing and future planet surveys targeting these objects, the metallicity estimates presented here will be important for assessing the significance of any putative planet–metallicity correlation.

  5. Cost estimation and management over the life cycle of metallurgical ...

    African Journals Online (AJOL)

    This study investigates whether all expected costs over the life cycle of metallurgical research projects are included in initial, normal and fi nal cost estimates, and whether these costs are managed throughout a project's life cycle since there is not enough emphasis on the accurate estimation of costs and their management ...

  6. 28 CFR 100.16 - Cost estimate submission.

    Science.gov (United States)

    2010-07-01

    ..., quantity, and cost. (ii) Direct labor. Provide a time-phased (e.g., monthly, quarterly) breakdown of labor... estimates. (iii) Allocable direct costs. Indicate how allocable costs are computed and applied, including... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Cost estimate submission. 100.16 Section...

  7. Estimating the magnitude of near-membrane PDE4 activity in living cells.

    Science.gov (United States)

    Xin, Wenkuan; Feinstein, Wei P; Britain, Andrea L; Ochoa, Cristhiaan D; Zhu, Bing; Richter, Wito; Leavesley, Silas J; Rich, Thomas C

    2015-09-15

    Recent studies have demonstrated that functionally discrete pools of phosphodiesterase (PDE) activity regulate distinct cellular functions. While the importance of localized pools of enzyme activity has become apparent, few studies have estimated enzyme activity within discrete subcellular compartments. Here we present an approach to estimate near-membrane PDE activity. First, total PDE activity is measured using traditional PDE activity assays. Second, known cAMP concentrations are dialyzed into single cells and the spatial spread of cAMP is monitored using cyclic nucleotide-gated channels. Third, mathematical models are used to estimate the spatial distribution of PDE activity within cells. Using this three-tiered approach, we observed two pharmacologically distinct pools of PDE activity, a rolipram-sensitive pool and an 8-methoxymethyl IBMX (8MM-IBMX)-sensitive pool. We observed that the rolipram-sensitive PDE (PDE4) was primarily responsible for cAMP hydrolysis near the plasma membrane. Finally, we observed that PDE4 was capable of blunting cAMP levels near the plasma membrane even when 100 μM cAMP were introduced into the cell via a patch pipette. Two compartment models predict that PDE activity near the plasma membrane, near cyclic nucleotide-gated channels, was significantly lower than total cellular PDE activity and that a slow spatial spread of cAMP allowed PDE activity to effectively hydrolyze near-membrane cAMP. These results imply that cAMP levels near the plasma membrane are distinct from those in other subcellular compartments; PDE activity is not uniform within cells; and localized pools of AC and PDE activities are responsible for controlling cAMP levels within distinct subcellular compartments. Copyright © 2015 the American Physiological Society.

  8. Estimating pressurized water reactor decommissioning costs: A user's manual for the PWR Cost Estimating Computer Program (CECP) software

    International Nuclear Information System (INIS)

    Bierschbach, M.C.; Mencinsky, G.J.

    1993-10-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the US Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personnel computer, provides estimates for the cost of decommissioning PWR plant stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

  9. Estimating magnitude and frequency of peak discharges for rural, unregulated, streams in West Virginia

    Science.gov (United States)

    Wiley, J.B.; Atkins, John T.; Tasker, Gary D.

    2000-01-01

    Multiple and simple least-squares regression models for the log10-transformed 100-year discharge with independent variables describing the basin characteristics (log10-transformed and untransformed) for 267 streamflow-gaging stations were evaluated, and the regression residuals were plotted as areal distributions that defined three regions of the State, designated East, North, and South. Exploratory data analysis procedures identified 31 gaging stations at which discharges are different than would be expected for West Virginia. Regional equations for the 2-, 5-, 10-, 25-, 50-, 100-, 200-, and 500-year peak discharges were determined by generalized least-squares regression using data from 236 gaging stations. Log10-transformed drainage area was the most significant independent variable for all regions.Equations developed in this study are applicable only to rural, unregulated, streams within the boundaries of West Virginia. The accuracy of estimating equations is quantified by measuring the average prediction error (from 27.7 to 44.7 percent) and equivalent years of record (from 1.6 to 20.0 years).

  10. Walk on the wild side: estimating the global magnitude of visits to protected areas.

    Directory of Open Access Journals (Sweden)

    Andrew Balmford

    2015-02-01

    Full Text Available How often do people visit the world's protected areas (PAs? Despite PAs covering one-eighth of the land and being a major focus of nature-based recreation and tourism, we don't know. To address this, we compiled a globally-representative database of visits to PAs and built region-specific models predicting visit rates from PA size, local population size, remoteness, natural attractiveness, and national income. Applying these models to all but the very smallest of the world's terrestrial PAs suggests that together they receive roughly 8 billion (8 x 109 visits/y-of which more than 80% are in Europe and North America. Linking our region-specific visit estimates to valuation studies indicates that these visits generate approximately US $600 billion/y in direct in-country expenditure and US $250 billion/y in consumer surplus. These figures dwarf current, typically inadequate spending on conserving PAs. Thus, even without considering the many other ecosystem services that PAs provide to people, our findings underscore calls for greatly increased investment in their conservation.

  11. Calculating the Unit Cost Factors for Decommissioning Cost Estimation of the Nuclear Research Reactor

    International Nuclear Information System (INIS)

    Jeong, Kwan Seong; Lee, Dong Gyu; Jung, Chong Hun; Lee, Kune Woo

    2006-01-01

    The estimated decommissioning cost of nuclear research reactor is calculated by applying a unit cost factor-based engineering cost calculation method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning cost of nuclear research reactor is composed of labor cost, equipment and materials cost. Labor cost of decommissioning costs in decommissioning works are calculated on the basis of working time consumed in decommissioning objects. In this paper, the unit cost factors and work difficulty factors which are needed to calculate the labor cost in estimating decommissioning cost of nuclear research reactor are derived and figured out.

  12. Very Fast Estimation of Epicentral Distance and Magnitude from a Single Three Component Seismic Station Using Machine Learning Techniques

    Science.gov (United States)

    Ochoa Gutierrez, L. H.; Niño Vasquez, L. F.; Vargas-Jimenez, C. A.

    2012-12-01

    To minimize adverse effects originated by high magnitude earthquakes, early warning has become a powerful tool to anticipate a seismic wave arrival to an specific location and lets to bring people and government agencies opportune information to initiate a fast response. To do this, a very fast and accurate characterization of the event must be done but this process is often made using seismograms recorded in at least 4 stations where processing time is usually greater than the wave travel time to the interest area, mainly in coarse networks. A faster process can be done if only one three component seismic station is used that is the closest unsaturated station respect to the epicenter. Here we present a Support Vector Regression algorithm which calculates Magnitude and Epicentral Distance using only 5 seconds of signal since P wave onset. This algorithm was trained with 36 records of historical earthquakes where the input were regression parameters of an exponential function estimated by least squares, corresponding to the waveform envelope and the maximum value of the observed waveform for each component in one single station. A 10 fold Cross Validation was applied for a Normalized Polynomial Kernel obtaining the mean absolute error for different exponents and complexity parameters. Magnitude could be estimated with 0.16 of mean absolute error and the distance with an error of 7.5 km for distances within 60 to 120 km. This kind of algorithm is easy to implement in hardware and can be used directly in the field station to make possible the broadcast of estimations of this values to generate fast decisions at seismological control centers, increasing the possibility to have an effective reactiontribute and Descriptors calculator for SVR model training and test

  13. Fast Estimation of Epicentral Distance and Magnitude from a Single Three Component Seismic Station Using Machine Learning Techniques

    Science.gov (United States)

    Ochoa Gutierrez, L. H.; Niño, L. F.; Vargas-Jimenez, C. A.

    2013-05-01

    To minimize adverse effects originated by high magnitude earthquakes, early warning has become a powerful tool to anticipate a seismic wave arrival to an specific location, bringing opportune information to people and government agencies to initiate a fast response. To do this, a very fast and accurate characterization of the event must be done but this process is often made using seismograms recorded in at least four stations where processing time is usually greater than the wave arrival time to the interest area, mainly in seismological coarse networks. A faster process can be done if only one three component seismic station, the closest unsaturated station with respect to the epicenter, is used. Here, we present a Support Vector Regression algorithm which calculates Magnitude and Epicentral Distance using only five seconds of signal since P wave onset. This algorithm was trained with 36 records of historical earthquakes, where the input included regression parameters of an exponential function estimated by least squares, of the waveform envelope and the maximum value of the observed waveform for each component in a single station. A ten-fold Cross Validation was applied for a Normalized Polynomial Kernel obtaining the mean absolute error for different exponents and complexity parameters. The Magnitude could be estimated with 0.16 units of mean absolute error and the distance with an error of 7.5 km for distances within 60 to 120 km. This kind of algorithm is easy to implement in hardware and can be used directly in the field seismological sensor to make the broadcast of estimations of these values possible to generate fast decisions at seismological control centers, increasing the possibility of having an effective reaction.

  14. Power plant cost estimates put to the test

    International Nuclear Information System (INIS)

    Crowley, J.H.

    1978-01-01

    The growth in standards for nuclear applications and the impact of these codes and standards on the cost of nuclear power plants is described. The preparation of cost estimates and reasons for apparent discrepancies are discussed. Consistent estimates of nuclear power plant costs have been prepared in the USA for over a decade. They show that the difference in capital costs between nuclear and coal fired plants is narrowing and that when total generating costs are calculated nuclear power is substantially cheaper. (UK)

  15. Cross Service Fixed-Wing Cost Estimation

    Science.gov (United States)

    2016-05-17

    costing aircraft , such as cost per system or cost per Air Force unit. There are differing opinions on how costs should be determined for aircraft . A 2010...large confidence interval , but this is most likely because of the addition of the B-2 Bomber, 15 Figure 8. CPFH Trends of Various Aircraft a very... Maintenance O&S Operating and Support OSD Office of the Secretary of Defense PAI Primary Aircraft Inventory POL Petroleum, Lubricants, and Oil SME

  16. An Overview Of Tool For Response Action Cost Estimating (TRACE)

    International Nuclear Information System (INIS)

    Ferries, S.R.; Klink, K.L.; Ostapkowicz, B.

    2012-01-01

    Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel(reg s ign) workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

  17. Lifetime costs of lung transplantation : Estimation of incremental costs

    NARCIS (Netherlands)

    VanEnckevort, PJ; Koopmanschap, MA; Tenvergert, EM; VanderBij, W; Rutten, FFH

    1997-01-01

    Despite an expanding number of centres which provide lung transplantation, information about the incremental costs of lung transplantation is scarce. From 1991 until 1995, in The Netherlands a technology assessment was performed which provided information about the incremental costs of lung

  18. Assuring Software Cost Estimates: Is it an Oxymoron?

    Science.gov (United States)

    Hihn, Jarius; Tregre, Grant

    2013-01-01

    The software industry repeatedly observes cost growth of well over 100% even after decades of cost estimation research and well-known best practices, so "What's the problem?" In this paper we will provide an overview of the current state oj software cost estimation best practice. We then explore whether applying some of the methods used in software assurance might improve the quality of software cost estimates. This paper especially focuses on issues associated with model calibration, estimate review, and the development and documentation of estimates as part alan integrated plan.

  19. Estimating the magnitude and frequency of floods for urban and small, rural streams in Georgia, South Carolina, and North Carolina

    Science.gov (United States)

    Feaster, Toby D.; Gotvald, Anthony J.; Weaver, J. Curtis

    2014-01-01

    Reliable estimates of the magnitude and frequency of floods are essential for such things as the design of transportation and water-conveyance structures, Flood Insurance Studies, and flood-plain management. The flood-frequency estimates are particularly important in densely populated urban areas. A multistate approach was used to update methods for determining the magnitude and frequency of floods in urban and small, rural streams that are not substantially affected by regulation or tidal fluctuations in Georgia, South Carolina, and North Carolina. The multistate approach has the advantage over a single state approach of increasing the number of stations available for analysis, expanding the geographical coverage that would allow for application of regional regression equations across state boundaries, and building on a previous flood-frequency investigation of rural streamflow-gaging stations (streamgages) in the Southeastern United States. In addition, streamgages from the inner Coastal Plain of New Jersey were included in the analysis. Generalized least-squares regression techniques were used to generate predictive equations for estimating the 50-, 20-, 10-, 4-, 2-, 1-, 0.5-, and 0.2-percent annual exceedance probability flows for urban and small, rural ungaged basins for three hydrologic regions; the Piedmont-Ridge and Valley, Sand Hills, and Coastal Plain. Incorporation of urban streamgages from New Jersey also allowed for the expansion of the applicability of the predictive equations in the Coastal Plain from 2.1 to 53.5 square miles. Explanatory variables in the regression equations included drainage area (DA) and percent of impervious area (IA) for the Piedmont-Ridge and Valley region; DA and percent of developed land for the Sand Hills; and DA, IA, and 24-hour, 50-year maximum precipitation for the Coastal Plain. An application spreadsheet also was developed that can be used to compute the flood-frequency estimates along with the 95-percent prediction

  20. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  1. [Hospital costs estimation by micro and gross-costing approaches].

    Science.gov (United States)

    Guerre, P; Hayes, N; Bertaux, A-C

    2018-03-01

    Cost analysis has become increasingly commonplace in healthcare facilities in recent years. Regardless of the aim, the first consideration for a hospital costing process is to determine the point of view, or perspective, to adopt. Should the cost figures reflect the healthcare facility's point of view or enlighten perspectives for the public health insurance system? Another consideration is in regard to the method to adopt, as there are several. The two most widely used methods to determine the costs of hospital treatments in France are the micro-costing method and the gross-costing method. The aims of this work are: (1) to describe each of these methods (e.g. data collection, assignment of monetary value to resource consumption) with their advantages and shortcomings as they relate to the difficulties encountered with their implementation in hospitals; (2) to present a review of the literature comparing the two methods and their possible combination; and (3) to propose ways to address the questions that need to be asked before compiling resource consumption data and assigning monetary value to hospital costs. A final diagram summarizes methodologies to be preferred according to the evaluation strategy and the impact on patient care. Copyright © 2018 Elsevier Masson SAS. All rights reserved.

  2. Access Based Cost Estimation for Beddown Analysis

    National Research Council Canada - National Science Library

    Pennington, Jasper E

    2006-01-01

    The purpose of this research is to develop an automated web-enabled beddown estimation application for Air Mobility Command in order to increase the effectiveness and enhance the robustness of beddown estimates...

  3. Estimating the costs of AECB regulation

    International Nuclear Information System (INIS)

    1981-04-01

    A comprehensive analysis of the costs to the Canadian nuclear industry of the present Atomic Energy Control Board regulatory activities was carried out to provide a framework for a socio-economic impact analysis of AECB regulations. Regulaory costs in uranium mining and milling, fuel fabrication, power generation, the nuclear fuel cycle as a whole, and radioisotope use are studied. The cost of safety measures which industry would still undertake in the absence of government regulations ('prudent operator' costs) are not included. (L.L.)

  4. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities

    International Nuclear Information System (INIS)

    Benjamin, Serge; Descures, Sylvain; Du Pasquier, Louis; Francois, Patrice; Buonarotti, Stefano; Mariotti, Giovanni; Tarakonov, Jurij; Daniska, Vladimir; Bergh, Niklas; Carroll, Simon; AaSTRoeM, Annika; Cato, Anna; De La Gardie, Fredrik; Haenggi, Hannes; Rodriguez, Jose; Laird, Alastair; Ridpath, Andy; La Guardia, Thomas; O'Sullivan, Patrick; ); Weber, Inge; )

    2017-01-01

    The cost estimation process of decommissioning nuclear facilities has continued to evolve in recent years, with a general trend towards demonstrating greater levels of detail in the estimate and more explicit consideration of uncertainties, the latter of which may have an impact on decommissioning project costs. The 2012 report on the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, a joint recommendation by the Nuclear Energy Agency (NEA), the International Atomic Energy Agency (IAEA) and the European Commission, proposes a standardised structure of cost items for decommissioning projects that can be used either directly for the production of cost estimates or for mapping of cost items for benchmarking purposes. The ISDC, however, provides only limited guidance on the treatment of uncertainty when preparing cost estimates. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities, prepared jointly by the NEA and IAEA, is intended to complement the ISDC, assisting cost estimators and reviewers in systematically addressing uncertainties in decommissioning cost estimates. Based on experiences gained in participating countries and projects, the report describes how uncertainty and risks can be analysed and incorporated in decommissioning cost estimates, while presenting the outcomes in a transparent manner

  5. A generic tool for cost estimating in aircraft design

    NARCIS (Netherlands)

    Castagne, S.; Curran, R.; Rothwell, A.; Price, M.; Benard, E.; Raghunathan, S.

    2008-01-01

    A methodology to estimate the cost implications of design decisions by integrating cost as a design parameter at an early design stage is presented. The model is developed on a hierarchical basis, the manufacturing cost of aircraft fuselage panels being analysed in this paper. The manufacturing cost

  6. Aircraft bi-level life cycle cost estimation

    NARCIS (Netherlands)

    Zhao, X.; Verhagen, W.J.C.; Curan, R.

    2015-01-01

    n an integrated aircraft design and analysis practice, Life Cycle Cost (LCC) is essential for decision making. The LCC of an aircraft is ordinarily partially estimated by emphasizing a specific cost type. However, an overview of the LCC including design and development cost, production cost,

  7. Trajectory-Based Operations (TBO) Cost Estimation, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The Innovation Laboratory, Inc., proposes to build a tool to estimate airline costs under TBO. This tool includes a cost model that explicitly reasons about traffic...

  8. Estimating the costs of AECB regulation

    International Nuclear Information System (INIS)

    1980-05-01

    An attempt is made to answer questions relating to the feasibility of determining costs imposed by regulatory activities of the Atomic Energy Control Board, and to provide a conceptual and methodological framework for an actual cost study of existing AECB requirments. (L.L.)

  9. Model improves oil field operating cost estimates

    International Nuclear Information System (INIS)

    Glaeser, J.L.

    1996-01-01

    A detailed operating cost model that forecasts operating cost profiles toward the end of a field's life should be constructed for testing depletion strategies and plans for major oil fields. Developing a good understanding of future operating cost trends is important. Incorrectly forecasting the trend can result in bad decision making regarding investments and reservoir operating strategies. Recent projects show that significant operating expense reductions can be made in the latter stages o field depletion without significantly reducing the expected ultimate recoverable reserves. Predicting future operating cost trends is especially important for operators who are currently producing a field and must forecast the economic limit of the property. For reasons presented in this article, it is usually not correct to either assume that operating expense stays fixed in dollar terms throughout the lifetime of a field, nor is it correct to assume that operating costs stay fixed on a dollar per barrel basis

  10. Estimating costs in the economic evaluation of medical technologies.

    Science.gov (United States)

    Luce, B R; Elixhauser, A

    1990-01-01

    The complexities and nuances of evaluating the costs associated with providing medical technologies are often underestimated by analysts engaged in economic evaluations. This article describes the theoretical underpinnings of cost estimation, emphasizing the importance of accounting for opportunity costs and marginal costs. The various types of costs that should be considered in an analysis are described; a listing of specific cost elements may provide a helpful guide to analysis. The process of identifying and estimating costs is detailed, and practical recommendations for handling the challenges of cost estimation are provided. The roles of sensitivity analysis and discounting are characterized, as are determinants of the types of costs to include in an analysis. Finally, common problems facing the analyst are enumerated with suggestions for managing these problems.

  11. Cost estimating relationships for nuclear power plant operationa and maintenance

    International Nuclear Information System (INIS)

    Bowers, H.I.; Fuller, L.C.; Myers, M.L.

    1987-11-01

    Revised cost estimating relationships for 1987 are presented for estimating annual nonfuel operation and maintenance (O and M) costs for light-water reactor (LWR) nuclear power plants, which update guidelines published previously in 1982. The purpose of these cost estimating relationships is for use in long range planning and evaluations of the economics of nuclear energy for electric power generation. A listing of a computer program, LWROM, implementing the cost estimating relationships and written in advanced BASIC for IBM personal computers, is included

  12. Estimation of optimal educational cost per medical student.

    Science.gov (United States)

    Yang, Eunbae B; Lee, Seunghee

    2009-09-01

    This study aims to estimate the optimal educational cost per medical student. A private medical college in Seoul was targeted by the study, and its 2006 learning environment and data from the 2003~2006 budget and settlement were carefully analyzed. Through interviews with 3 medical professors and 2 experts in the economics of education, the study attempted to establish the educational cost estimation model, which yields an empirically computed estimate of the optimal cost per student in medical college. The estimation model was based primarily upon the educational cost which consisted of direct educational costs (47.25%), support costs (36.44%), fixed asset purchases (11.18%) and costs for student affairs (5.14%). These results indicate that the optimal cost per student is approximately 20,367,000 won each semester; thus, training a doctor costs 162,936,000 won over 4 years. Consequently, we inferred that the tuition levels of a local medical college or professional medical graduate school cover one quarter or one-half of the per- student cost. The findings of this study do not necessarily imply an increase in medical college tuition; the estimation of the per-student cost for training to be a doctor is one matter, and the issue of who should bear this burden is another. For further study, we should consider the college type and its location for general application of the estimation method, in addition to living expenses and opportunity costs.

  13. Process-based Cost Estimation for Ramjet/Scramjet Engines

    Science.gov (United States)

    Singh, Brijendra; Torres, Felix; Nesman, Miles; Reynolds, John

    2003-01-01

    Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

  14. Estimating Texas motor vehicle operating costs.

    Science.gov (United States)

    2009-10-01

    A specific Vcost model was developed for Texas conditions based on a sophisticated fuel model for light : duty vehicles, several excellent sources of secondary vehicle cost data, and the ability to measure heavy truck fuel : consumption through both ...

  15. Methods for estimating magnitude and frequency of floods in Arizona, developed with unregulated and rural peak-flow data through water year 2010

    Science.gov (United States)

    Paretti, Nicholas V.; Kennedy, Jeffrey R.; Turney, Lovina A.; Veilleux, Andrea G.

    2014-01-01

    Flooding is among the worst natural disasters responsible for loss of life and property in Arizona, underscoring the importance of accurate estimation of flood magnitude for proper structural design and floodplain mapping. Twenty-four years of additional peak-flow data have been recorded since the last comprehensive regional flood frequency analysis conducted in Arizona. Periodically, flood frequency estimates and regional regression equations must be revised to maintain the accurate estimation of flood frequency and magnitude.

  16. Handbook for cost estimating. A method for developing estimates of costs for generic actions for nuclear power plants

    International Nuclear Information System (INIS)

    Ball, J.R.; Cohen, S.; Ziegler, E.Z.

    1984-10-01

    This document provides overall guidance to assist the NRC in preparing the types of cost estimates required by the Regulatory Analysis Guidelines and to assist in the assignment of priorities in resolving generic safety issues. The Handbook presents an overall cost model that allows the cost analyst to develop a chronological series of activities needed to implement a specific regulatory requirement throughout all applicable commercial LWR power plants and to identify the significant cost elements for each activity. References to available cost data are provided along with rules of thumb and cost factors to assist in evaluating each cost element. A suitable code-of-accounts data base is presented to assist in organizing and aggregating costs. Rudimentary cost analysis methods are described to allow the analyst to produce a constant-dollar, lifetime cost for the requirement. A step-by-step example cost estimate is included to demonstrate the overall use of the Handbook

  17. Costs of regulatory compliance: categories and estimating techniques

    International Nuclear Information System (INIS)

    Schulte, S.C.; McDonald, C.L.; Wood, M.T.; Cole, R.M.; Hauschulz, K.

    1978-10-01

    Use of the categorization scheme and cost estimating approaches presented in this report can make cost estimates of regulation required compliance activities of value to policy makers. The report describes a uniform assessment framework that when used would assure that cost studies are generated on an equivalent basis. Such normalization would make comparisons of different compliance activity cost estimates more meaningful, thus enabling the relative merits of different regulatory options to be more effectively judged. The framework establishes uniform cost reporting accounts and cost estimating approaches for use in assessing the costs of complying with regulatory actions. The framework was specifically developed for use in a current study at Pacific Northwest Laboratory. However, use of the procedures for other applications is also appropriate

  18. Revised cost savings estimate with uncertainty for enhanced sludge washing of underground storage tank waste

    International Nuclear Information System (INIS)

    DeMuth, S.

    1998-01-01

    Enhanced Sludge Washing (ESW) has been selected to reduce the amount of sludge-based underground storage tank (UST) high-level waste at the Hanford site. During the past several years, studies have been conducted to determine the cost savings derived from the implementation of ESW. The tank waste inventory and ESW performance continues to be revised as characterization and development efforts advance. This study provides a new cost savings estimate based upon the most recent inventory and ESW performance revisions, and includes an estimate of the associated cost uncertainty. Whereas the author's previous cost savings estimates for ESW were compared against no sludge washing, this study assumes the baseline to be simple water washing which more accurately reflects the retrieval activity along. The revised ESW cost savings estimate for all UST waste at Hanford is $6.1 B ± $1.3 B within 95% confidence. This is based upon capital and operating cost savings, but does not include development costs. The development costs are assumed negligible since they should be at least an order of magnitude less than the savings. The overall cost savings uncertainty was derived from process performance uncertainties and baseline remediation cost uncertainties, as determined by the author's engineering judgment

  19. The effect of preference for three different types of music on magnitude estimation-scaling behavior in young adults.

    Science.gov (United States)

    Fucci, D; Petrosino, L; Banks, M; Zaums, K; Wilcox, C

    1996-08-01

    The purpose of the present study was to assess the effect of preference for three different types of music on magnitude estimation scaling behavior in young adults. Three groups of college students, 10 who liked rock music, 10 who liked big band music, and 10 who liked classical music were tested. Subjects were instructed to assign numerical values to a random series of nine suprathreshold intensity levels of 10-sec, samples of rock music, big band music, and classical music. Analysis indicated that subjects who liked rock music scaled that stimulus differently from those subjects who liked big band and classical music. Subjects who liked big band music scaled that stimulus differently from those subjects who liked rock music and classical music. All subjects scaled classical music similarly regardless of their musical preferences. Results are discussed in reference to the literature concerned with personality and preference as well as spectrographic analyses of the three different types of music used in this study.

  20. A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

    Science.gov (United States)

    Foreman, Veronica L.; Le Moigne, Jacqueline; de Weck, Oliver

    2016-01-01

    Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the limitations of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-theart in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority shortcomings within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities

  1. Establishing a cost model when estimating product cost in early design phases

    OpenAIRE

    Jeppsson, Johanna; Sjöberg, Jessica

    2017-01-01

    About 75% of the total product cost is determined in the early design phase, which means that the possibilities to affect costs are relatively small when the design phase is completed. For companies, it is therefore vital to conduct reliable cost estimates in the early design phase, when selecting between different design choices. When conducting a cost estimate there are many uncertainties. The aim with this study is therefore to explore how uncertainties regarding product cost can be consid...

  2. The relation between postural sway magnitude and metabolic energy cost during upright standing on a compliant surface.

    NARCIS (Netherlands)

    Houdijk, J.H.P.; Brown, S.; van Dieen, J.H.

    2015-01-01

    Postural control performance is often described in terms of postural sway magnitude, assuming that lower sway magnitude reflects better performance. However, people do not typically minimize sway magnitude when performing a postural control task. Possibly, other criteria are satisfied when people

  3. Estimating management costs of protected areas

    DEFF Research Database (Denmark)

    Green, Jonathan M.H.; Burgess, Neil David; Green, Rhys E.

    2012-01-01

    Despite chronic underfunding for conservation and the recognition that funds must be invested wisely, few studies have analysed the direct costs of managing protected areas at the spatial scales needed to inform local site management. Using a questionnaire survey we collected data from protected...... area managers in the Eastern Arc Mountains (EAMs) of Tanzania to establish how much is currently spent on reserve management and how much is required to meet conservation objectives. We use an information theoretic approach to model spatial variation in these costs using a range of plausible, spatially...... in actual spend and over 40% of variation in necessary spend. Population pressure is a variable that has not been used to model protected area management costs before, yet proved to be considerably better at predicting both actual and necessary spend than other measures of anthropogenic pressure. We use our...

  4. The Practice of Cost Estimation for Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    Davidova, Ivana; Desecures, Sylvain; Lexow, Thomas; Buonarroti, Stefano; Marini, Giuseppe; Pescatore, Claudio; Rehak, Ivan; Weber, Inge; ); Daniska, Vladimir; Linan, Jorge Borque; Caroll, Simon; Hedberg, Bjoern; De La Gardie, Fredrik; Haenggi, Hannes; Laguardia, Thomas S.; Ridpath, Andy

    2015-01-01

    Decommissioning of both commercial and R and D nuclear facilities is expected to increase significantly in the coming years, and the largest of such industrial decommissioning projects could command considerable budgets. Several approaches are currently being used for decommissioning cost estimations, with an international culture developing in the field. The present cost estimation practice guide was prepared in order to offer international actors specific guidance in preparing quality cost and schedule estimates to support detailed budgeting for the preparation of decommissioning plans, for the securing of funds and for decommissioning implementation. This guide is based on current practices and standards in a number of NEA member countries and aims to help consolidate the practice and process of decommissioning cost estimation so as to make it more widely understood. It offers a useful reference for the practitioner and for training programmes. The remainder of report is divided into the following chapters: - Chapter 2 covers the purpose and nature of decommissioning cost estimates, approaches to cost estimation and the major elements of a cost estimate. - Chapter 3 examines the development of the integrated schedule of the activity-dependent work scope and the determination of the project critical path. - Chapter 4 describes the attributes of a quality assurance programme applicable to cost estimation and the use and cautions of benchmarking the estimate from other estimates or actual costs. - Chapter 5 describes the pyramidal structure of the report, and the scope and content that should be included in the cost study report to ensure consistency and transparency in the estimate underpinnings. - Chapter 6 provides some observations, conclusions and recommendations on the use of this guide

  5. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1986-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies

  6. Cost estimating issues in the Russian integrated system planning context

    International Nuclear Information System (INIS)

    Allentuck, J.

    1996-01-01

    An important factor in the credibility of an optimal capacity expansion plan is the accuracy of cost estimates given the uncertainty of future economic conditions. This paper examines the problems associated with estimating investment and operating costs in the Russian nuclear power context over the period 1994 to 2010

  7. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R. II.

    1990-03-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 10 refs., 8 figs., 32 tabs

  8. Development of regional stump-to-mill logging cost estimators

    Science.gov (United States)

    Chris B. LeDoux; John E. Baumgras

    1989-01-01

    Planning logging operations requires estimating the logging costs for the sale or tract being harvested. Decisions need to be made on equipment selection and its application to terrain. In this paper a methodology is described that has been developed and implemented to solve the problem of accurately estimating logging costs by region. The methodology blends field time...

  9. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1987-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies

  10. Virtualness of the Cost Estimating Community

    Science.gov (United States)

    2011-03-01

    Introduction ......................................................................................................................................... 1...I. Introduction Overview Department of Defense (DoD) acquisition programs tend to cost more and require longer development periods than...behaviors on information technology professionals’ turnover intentions. Group Organization Mangement , 326-357. Pegnato, J. A. (2003). Assessing

  11. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT

    International Nuclear Information System (INIS)

    R.E. Sweeney

    2001-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  12. Monitored Geologic Repository Life Cycle Cost Estimate Assumptions Document

    International Nuclear Information System (INIS)

    Sweeney, R.

    2000-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost estimate and schedule update incorporating information from the Viability Assessment (VA), License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  13. Guidelines for estimating nuclear power plant decommissioning costs

    International Nuclear Information System (INIS)

    LaGuardia, T.S.; Williams, D.H.

    1989-01-01

    The objectives of the study were: (1) To develop guidelines to facilitate estimating the cost of nuclear power plant decommissioning alternatives on a plant-specific basis and to facilitate comparing estimates made by others. The guidelines are expressed in a form that could be readily adapted by technical specialists from individual utilities or by other uses. (2) To enhance the industry's credibility with decision-makes at the state and federal levels during rate/regulatory processes involving decommissioning costs. This is accomplished by providing a detailed, systematic breakdown of how decommissioning cost estimates are prepared. (3) To increase the validity, realism, and accuracy of site-specific decommissioning cost estimates. This is accomplished by pulling together the experiences and practices of several nuclear utilities and consultants in conducting past decommissioning cost estimates

  14. Estimating two indirect logging costs caused by accelerated erosion.

    Science.gov (United States)

    Glen O. Klock

    1976-01-01

    In forest areas where high soil erosion potential exists, a comparative yarding cost estimate, including the indirect costs determined by methods proposed here, shows that the total cost of using "advanced" logging methods may be less than that of "traditional" systems.

  15. An improved COCOMO software cost estimation model | Duke ...

    African Journals Online (AJOL)

    In this paper, we discuss the methodologies adopted previously in software cost estimation using the COnstructive COst MOdels (COCOMOs). From our analysis, COCOMOs produce very high software development efforts, which eventually produce high software development costs. Consequently, we propose its extension, ...

  16. AX Tank Farm waste retrieval alternatives cost estimates

    International Nuclear Information System (INIS)

    Krieg, S.A.

    1998-01-01

    This report presents the estimated costs associated with retrieval of the wastes from the four tanks in AX Tank Farm. The engineering cost estimates developed for this report are based on previous cost data prepared for Project W-320 and the HTI 241-C-106 Heel Retrieval System. The costs presented in this report address only the retrieval of the wastes from the four AX Farm tanks. This includes costs for equipment procurement, fabrication, installation, and operation to retrieve the wastes. The costs to modify the existing plant equipment and systems to support the retrieval equipment are also included. The estimates do not include operational costs associated with pumping the waste out of the waste receiver tank (241-AY-102) between AX Farm retrieval campaigns or transportation, processing, and disposal of the retrieved waste

  17. The QUELCE Method: Using Change Drivers to Estimate Program Costs

    Science.gov (United States)

    2016-08-01

    Analysis 4 2.4 Assign Conditional Probabilities 5 2.5 Apply Uncertainty to Cost Formula Inputs for Scenarios 5 2.6 Perform Monte Carlo Simulation to...Distribution Statement A: Approved for Public Release; Distribution is Unlimited 1 Introduction: The Cost Estimation Challenge Because large-scale programs... challenged [Bliss 2012]. Improvements in cost estimation that would make these assumptions more precise and reduce early lifecycle uncertainty can

  18. Estimating the economic cost of disability in Ireland

    OpenAIRE

    Cullinan, John; Gannon, Brenda; Lyons, Seán

    2008-01-01

    Addressing the extra economic costs of disability seems a logical step towards alleviating elements of social exclusion for people with disabilities. This paper estimates the economic cost of disability in Ireland in terms of the additional spending needs that arise due to disability. It defines and estimates models of the private costs borne by families with individuals who have a disability in Ireland when compared to the wider population, both in general and by severity of illness. Our mod...

  19. Estimating Instantaneous Energetic Cost During Gait Adaptation

    Science.gov (United States)

    2014-08-31

    energetic cost. Its 327   accuracy benefits from a personalized model for each subject, but for some situations, it may suffice to 328   use the...Activity 380   Patterns During Robotic - and Therapist-Assisted Treadmill Walking in Individuals With 381   Incomplete Spinal Cord Injury. Phys Ther 86...of level walking with powered ankle 410   exoskeletons . Journal of Experimental Biology 211: 1402–1413, 2008. 411   25. Schmalz T, Blumentritt S

  20. Composite Aircraft Life Cycle Cost Estimating Model

    Science.gov (United States)

    2011-03-01

    X. The masked fit of the lines are as follows: • Part Count Percentage Reduction for Design hours ( HRE %) = • Part Count Percentage Reduction...multiplied by the respective labor rate (LR). Currently, CT is a percentage of total non- recurring development cost. HRE corresponds to recurring...Empty Weight Velocity RENGR HRE CRE 46 Figure 14: Non-Recurring Engineering CER Currently, CT is a percentage of non-recurring development

  1. Estimated costs and admissible claims linked to the Prestige oil spill

    International Nuclear Information System (INIS)

    Loureiro, Maria L.; Ribas, Alfonso; Ojea, Elena; Lopez, Edelmiro

    2006-01-01

    The current case study presents an evaluation of the societal costs caused by the Prestige oil spill. We conclude that the economic magnitude of the catastrophe caused by the Prestige oil spill is rather significant. Short-term losses in all affected economic sectors, cleaning and recovery costs, and all environmental losses accountable at this point, add to a lower bound estimate of 770.58 million euro (prices in 2001 currency), excluding all other financial and future possible losses. Such important losses justify future studies that assess potential costs and benefits derived from the application of preventive measures and other contingency plans. (author)

  2. Development of computer program for estimating decommissioning cost - 59037

    International Nuclear Information System (INIS)

    Kim, Hak-Soo; Park, Jong-Kil

    2012-01-01

    The programs for estimating the decommissioning cost have been developed for many different purposes and applications. The estimation of decommissioning cost is required a large amount of data such as unit cost factors, plant area and its inventory, waste treatment, etc. These make it difficult to use manual calculation or typical spreadsheet software such as Microsoft Excel. The cost estimation for eventual decommissioning of nuclear power plants is a prerequisite for safe, timely and cost-effective decommissioning. To estimate the decommissioning cost more accurately and systematically, KHNP, Korea Hydro and Nuclear Power Co. Ltd, developed a decommissioning cost estimating computer program called 'DeCAT-Pro', which is Decommission-ing Cost Assessment Tool - Professional. (Hereinafter called 'DeCAT') This program allows users to easily assess the decommissioning cost with various decommissioning options. Also, this program provides detailed reporting for decommissioning funding requirements as well as providing detail project schedules, cash-flow, staffing plan and levels, and waste volumes by waste classifications and types. KHNP is planning to implement functions for estimating the plant inventory using 3-D technology and for classifying the conditions of radwaste disposal and transportation automatically. (authors)

  3. A contribution to improved flood magnitude estimation in base of palaeoflood record and climatic implications – Guadiana River (Iberian Peninsula

    Directory of Open Access Journals (Sweden)

    J. A. Ortega

    2009-02-01

    Full Text Available The Guadiana River has a significant record of historical floods, but the systematic data record is only 59 years. From layers left by ancient floods we know about we can add new data to the record, and we can estimate maximum discharges of other floods only known by the moment of occurrence and by the damages caused. A hydraulic model has been performed in the area of Pulo de Lobo and calibrated by means of the rating curve of Pulo do Lobo Station. The palaeofloods have been dated by means of 14C y 137Cs. As non-systematic information has been used in order to calculate distribution functions, the quantiles have changed with respect to the same function when using systematic information. The results show a variation in the curves that can be blamed on the human transformations responsible for changing the hydrologic conditions as well as on the latest climate changes. High magnitude floods are related to cold periods, especially at transitional moments of change from cold to warm periods. This tendency has changed from the last medium-high magnitude flood, which took place in a systematic period. Both reasons seem to justify a change in the frequency curves indicating a recent decrease in the return period of big floods over 8000 m3 s−1. The palaeofloods indicate a bigger return period for the same water level discharge thus showing the river basin reference values in its natural condition previous to the transformation of the basin caused by anthropic action.

  4. Methods for estimating the magnitude and frequency of floods for urban and small, rural streams in Georgia, South Carolina, and North Carolina, 2011.

    Science.gov (United States)

    2014-03-01

    The central purpose of this report is to present methods : for estimating the magnitude and frequency of floods on : urban and small, rural streams in the Southeast United States : with particular focus on Georgia, South Carolina, and North : Carolin...

  5. Reducing Inventory System Costs by Using Robust Demand Estimators

    OpenAIRE

    Raymond A. Jacobs; Harvey M. Wagner

    1989-01-01

    Applications of inventory theory typically use historical data to estimate demand distribution parameters. Imprecise knowledge of the demand distribution adds to the usual replenishment costs associated with stochastic demands. Only limited research has been directed at the problem of choosing cost effective statistical procedures for estimating these parameters. Available theoretical findings on estimating the demand parameters for (s, S) inventory replenishment policies are limited by their...

  6. Parametric Cost Estimates for an International Competitive Edge

    International Nuclear Information System (INIS)

    Murphy, L.T.; Hickey, M.

    2006-01-01

    This paper summarizes the progress to date by CH2M HILL and the UKAEA in development of a parametric modelling capability for estimating the costs of large nuclear decommissioning projects in the United Kingdom (UK) and Europe. The ability to successfully apply parametric cost estimating techniques will be a key factor to commercial success in the UK and European multi-billion dollar waste management, decommissioning and environmental restoration markets. The most useful parametric models will be those that incorporate individual components representing major elements of work: reactor decommissioning, fuel cycle facility decommissioning, waste management facility decommissioning and environmental restoration. Models must be sufficiently robust to estimate indirect costs and overheads, permit pricing analysis and adjustment, and accommodate the intricacies of international monetary exchange, currency fluctuations and contingency. The development of a parametric cost estimating capability is also a key component in building a forward estimating strategy. The forward estimating strategy will enable the preparation of accurate and cost-effective out-year estimates, even when work scope is poorly defined or as yet indeterminate. Preparation of cost estimates for work outside the organizations current sites, for which detailed measurement is not possible and historical cost data does not exist, will also be facilitated. (authors)

  7. Computerized cost estimation spreadsheet and cost data base for fusion devices

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Rothe, K.E.

    1985-01-01

    An automated approach to performing and cataloging cost estimates has been developed at the Fusion Engineering Design Center (FEDC), wherein the cost estimate record is stored in the LOTUS 1-2-3 spreadsheet on an IBM personal computer. The cost estimation spreadsheet is based on the cost coefficient/cost algorithm approach and incorporates a detailed generic code of cost accounts for both tokamak and tandem mirror devices. Component design parameters (weight, surface area, etc.) and cost factors are input, and direct and indirect costs are calculated. The cost data base file derived from actual cost experience within the fusion community and refined to be compatible with the spreadsheet costing approach is a catalog of cost coefficients, algorithms, and component costs arranged into data modules corresponding to specific components and/or subsystems. Each data module contains engineering, equipment, and installation labor cost data for different configurations and types of the specific component or subsystem. This paper describes the assumptions, definitions, methodology, and architecture incorporated in the development of the cost estimation spreadsheet and cost data base, along with the type of input required and the output format

  8. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  9. Cost estimates for nuclear power in the UK

    International Nuclear Information System (INIS)

    Harris, Grant; Heptonstall, Phil; Gross, Robert; Handley, David

    2013-01-01

    Current UK Government support for nuclear power has in part been informed by cost estimates that suggest that electricity from new nuclear power stations will be competitive with alternative low carbon generation options. The evidence and analysis presented in this paper suggests that the capital cost estimates for nuclear power that are being used to inform these projections rely on costs escalating over the pre-construction and construction phase of the new build programme at a level significantly below those that have been experienced by past US and European programmes. This paper applies observed construction time and cost escalation rates to the published estimates of capital costs for new nuclear plant in the UK and calculates the potential impact on levelised cost per unit of electricity produced. The results suggest that levelised cost may turn out to be significantly higher than expected which in turn has important implications for policy, both in general terms of the potential costs to consumers and more specifically for negotiations around the level of policy support and contractual arrangements offered to individual projects through the proposed contract for difference strike price. -- Highlights: •Nuclear power projects costs can rise substantially during the construction period. •Pre-construction and construction time can be much longer than anticipated. •Adjusting estimates for observed experience increases levelised costs significantly. •Higher costs suggest that more policy support than envisaged may be required

  10. 16 CFR 305.5 - Determinations of estimated annual energy consumption, estimated annual operating cost, and...

    Science.gov (United States)

    2010-01-01

    ... consumption, estimated annual operating cost, and energy efficiency rating, and of water use rate. 305.5... RULE CONCERNING DISCLOSURES REGARDING ENERGY CONSUMPTION AND WATER USE OF CERTAIN HOME APPLIANCES AND... § 305.5 Determinations of estimated annual energy consumption, estimated annual operating cost, and...

  11. Comparing Methods for Estimating Direct Costs of Adverse Drug Events.

    Science.gov (United States)

    Gyllensten, Hanna; Jönsson, Anna K; Hakkarainen, Katja M; Svensson, Staffan; Hägg, Staffan; Rehnberg, Clas

    2017-12-01

    To estimate how direct health care costs resulting from adverse drug events (ADEs) and cost distribution are affected by methodological decisions regarding identification of ADEs, assigning relevant resource use to ADEs, and estimating costs for the assigned resources. ADEs were identified from medical records and diagnostic codes for a random sample of 4970 Swedish adults during a 3-month study period in 2008 and were assessed for causality. Results were compared for five cost evaluation methods, including different methods for identifying ADEs, assigning resource use to ADEs, and for estimating costs for the assigned resources (resource use method, proportion of registered cost method, unit cost method, diagnostic code method, and main diagnosis method). Different levels of causality for ADEs and ADEs' contribution to health care resource use were considered. Using the five methods, the maximum estimated overall direct health care costs resulting from ADEs ranged from Sk10,000 (Sk = Swedish krona; ~€1,500 in 2016 values) using the diagnostic code method to more than Sk3,000,000 (~€414,000) using the unit cost method in our study population. The most conservative definitions for ADEs' contribution to health care resource use and the causality of ADEs resulted in average costs per patient ranging from Sk0 using the diagnostic code method to Sk4066 (~€500) using the unit cost method. The estimated costs resulting from ADEs varied considerably depending on the methodological choices. The results indicate that costs for ADEs need to be identified through medical record review and by using detailed unit cost data. Copyright © 2017 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  12. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R. II.

    1993-05-01

    Several advanced power plant concepts are currently under development. These include the Modular High Temperature Gas Cooled Reactors, the Advanced Liquid Metal Reactor and the Advanced Light Water Reactors. One measure of the attractiveness of a new concept is its cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electrical generation. This report provides a common starting point, whereby the cost estimates for the various power plants to be considered are developed with common assumptions and ground rules. Comparisons can then be made on a consistent basis. This is the second update of these cost estimate guidelines. Changes have been made to make the guidelines more current (January 1, 1992) and in response to suggestions made as a result of the use of the previous report. The principal changes are that the reference site has been changed from a generic Northeast (Middletown) site to a more central site (EPRI's East/West Central site) and that reference bulk commodity prices and labor productivity rates have been added. This report is designed to provide a framework for the preparation and reporting of costs. The cost estimates will consist of the overnight construction cost, the total plant capital cost, the operation and maintenance costs, the fuel costs, decommissioning costs and the power production or busbar generation cost

  13. Cost-estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R.

    1993-01-01

    Various advanced power plant concepts are currently under development. These include several advanced light water reactors as well as the modular high-temperature gas-cooled reactor and the advanced liquid-metal reactor. One measure-of the attractiveness of a new concept is cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electric generation. In order to make reasonable comparative assessments of competing technologies, consistent ground rules and assumptions must be applied when developing cost estimates. This paper describes the cost-estimate guidelines developed by Oak Ridge National Laboratory for the U.S. Department of Energy (DOE) to be used in developing cost estimates for the advanced nuclear reactors and how these guidelines relate to the DOE cost verification process

  14. The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities

    International Nuclear Information System (INIS)

    Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee

    2007-01-01

    Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

  15. Cost Estimates for the Decontamination and Decommissioning of Eight ORNL Buildings

    International Nuclear Information System (INIS)

    Hogan, M.

    2006-01-01

    The U.S. Department of Energy's Oak Ridge National Laboratory (ORNL) contains a number of buildings that are antiquated and no longer used. These buildings historically were used for the production of atomic weapons and often remain contaminated with radioactive materials. Certain costs and risks are associated with the long-term stewardship of the buildings. One way to reduce these liabilities is to eliminate the buildings that are no longer in use and are not expected to be used in the future. Some of these buildings at ORNL are located in an area known as 'Isotope Circle'. From this area, eight buildings that are expected to be decontaminated and decommissioned (D and D) in the next five to ten years were chosen to have cost estimates completed. The specific facilities are Buildings 3030, 3031, 3118, 3032, 3033, 3033 Annex, 3034, and 3093. There are many challenges for estimating the costs to D and D buildings potentially contaminated with radionuclides. Each building is unique, has various types and levels of contamination, and (as in this case) often lacks up-to-date information. Because of these limitations, order-of- magnitude cost estimates for each of the eight ORNL buildings were completed using parametric cost modeling software known as RACER TM (Remedial Action Cost Engineering and Requirements System). This type of cost estimate is useful for screening technical concepts and is used for budgetary planning. For the eight buildings evaluated in this study, the total cost to D and D was estimated to be nearly $6 M. This value includes the direct cost of approximately $3.5 M to complete D and D and $2.5 M in cost markups. Also, assuming the actual project does not begin until the year 2010, this total cost is escalated to almost $6.7 M, which accounts for expected inflation. Although the cost estimates in this study were expected to have a wide range in accuracy, there are various factors that could impact these estimates in a negative or positive fashion

  16. Well-founded cost estimation validated by experience

    International Nuclear Information System (INIS)

    LaGuardia, T.S.

    2005-01-01

    Full text: Reliable cost estimating is one of the most important elements of decommissioning planning. Alternative technologies may be evaluated and compared based on their efficiency and effectiveness, and measured against a baseline cost as to the feasibility and benefits derived from the technology. When the plan is complete, those cost considerations ensure that it is economically sound and practical for funding. Estimates of decommissioning costs have been performed and published by many organizations for many different applications. The results often vary because of differences in the work scope. Labor force cost, monetary considerations, oversight costs, the specific contaminated materials involved, the waste stream and peripheral costs associated with that type of waste, or applicable environmental compliance requirements. Many of these differences are unavoidable since a reasonable degree of reliability and accuracy can only be achieved by developing decommissioning cost estimates on a case-by-case site-specific basis. This paper describes the estimating methodology and process applied to develop decommissioning cost estimates. A major effort has been made to standardize these methodologies, and to understand the assumptions and bases that drive the costs. However, estimates are only as accurate as the information available from which to derive the costs. This information includes the assumptions of scope of the work, labour cost inputs, inflationary effects, and financial analyses that project these costs to year of expenditure. Attempts at comparison of estimates for two facilities of similar design and size must clearly identify the assumptions used in developing the estimate, and comparison of actual costs versus estimated costs must reflect these same assumptions. For the nuclear industry to grow, decommissioning estimating tools must improve to keep pace with changing technology, regulations and stakeholder issues. The decommissioning industry needs

  17. An Adjusted Discount Rate Model for Fuel Cycle Cost Estimation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. K.; Kang, G. B.; Ko, W. I. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    Owing to the diverse nuclear fuel cycle options available, including direct disposal, it is necessary to select the optimum nuclear fuel cycles in consideration of the political and social environments as well as the technical stability and economic efficiency of each country. Economic efficiency is therefore one of the significant evaluation standards. In particular, because nuclear fuel cycle cost may vary in each country, and the estimated cost usually prevails over the real cost, when evaluating the economic efficiency, any existing uncertainty needs to be removed when possible to produce reliable cost information. Many countries still do not have reprocessing facilities, and no globally commercialized HLW (High-level waste) repository is available. A nuclear fuel cycle cost estimation model is therefore inevitably subject to uncertainty. This paper analyzes the uncertainty arising out of a nuclear fuel cycle cost evaluation from the viewpoint of a cost estimation model. Compared to the same discount rate model, the nuclear fuel cycle cost of a different discount rate model is reduced because the generation quantity as denominator in Equation has been discounted. Namely, if the discount rate reduces in the back-end process of the nuclear fuel cycle, the nuclear fuel cycle cost is also reduced. Further, it was found that the cost of the same discount rate model is overestimated compared with the different discount rate model as a whole.

  18. An Adjusted Discount Rate Model for Fuel Cycle Cost Estimation

    International Nuclear Information System (INIS)

    Kim, S. K.; Kang, G. B.; Ko, W. I.

    2013-01-01

    Owing to the diverse nuclear fuel cycle options available, including direct disposal, it is necessary to select the optimum nuclear fuel cycles in consideration of the political and social environments as well as the technical stability and economic efficiency of each country. Economic efficiency is therefore one of the significant evaluation standards. In particular, because nuclear fuel cycle cost may vary in each country, and the estimated cost usually prevails over the real cost, when evaluating the economic efficiency, any existing uncertainty needs to be removed when possible to produce reliable cost information. Many countries still do not have reprocessing facilities, and no globally commercialized HLW (High-level waste) repository is available. A nuclear fuel cycle cost estimation model is therefore inevitably subject to uncertainty. This paper analyzes the uncertainty arising out of a nuclear fuel cycle cost evaluation from the viewpoint of a cost estimation model. Compared to the same discount rate model, the nuclear fuel cycle cost of a different discount rate model is reduced because the generation quantity as denominator in Equation has been discounted. Namely, if the discount rate reduces in the back-end process of the nuclear fuel cycle, the nuclear fuel cycle cost is also reduced. Further, it was found that the cost of the same discount rate model is overestimated compared with the different discount rate model as a whole

  19. Predicting Software Projects Cost Estimation Based on Mining Historical Data

    OpenAIRE

    Najadat, Hassan; Alsmadi, Izzat; Shboul, Yazan

    2012-01-01

    In this research, a hybrid cost estimation model is proposed to produce a realistic prediction model that takes into consideration software project, product, process, and environmental elements. A cost estimation dataset is built from a large number of open source projects. Those projects are divided into three domains: communication, finance, and game projects. Several data mining techniques are used to classify software projects in terms of their development complexity. Data mining techniqu...

  20. Cost estimation of the future harvest as agricultural loan collateral

    Directory of Open Access Journals (Sweden)

    Vnukova, N. N.

    2013-07-01

    Full Text Available The aim of this work is to attempt developing recommendations which may improve the overall banking technique of future cropping cost estimating. Objectives that have been set to achieve this aim are: to analyze alternative techniques of future cropping cost estimating; to perform calculation according to the selected techniques for 10 agricultural companies from different regions of Ukraine; to compare the techniques by means of hierarchy analysis method.

  1. The Acquisition Cost-Estimating Workforce. Census and Characteristics

    Science.gov (United States)

    2009-01-01

    Abbreviations AAC Air Armament Center ACAT acquisition category ACEIT Automated Cost Estimating Integrated Tools AF Air Force AFB Air Force Base AFCAA Air...3 3 4 Automated Cost Estimating Integrated Tools ( ACEIT ) 0 1 12 6 Tecolotea training 0 0 10 5 Other 3 13 24 18 No training 18 4 29 18 Total 100 100...other sources, including AFIT, ACEIT ,9 or the contracting agency that employed them. The remain- ing 29 percent reported having received no training

  2. Cost of Capital Estimation for Highway Concessionaires in Chile

    Directory of Open Access Journals (Sweden)

    Cristian Vergara-Novoa

    2018-01-01

    Full Text Available In this paper, we present the cost of capital estimation for highway concessionaires in Chile. We estimated the cost of equity and the cost of debt and determined the capital structure for each one of twenty-four concessionaires that operate highways. We based our estimations on the developments of Sharpe (1964, Modigliani and Miller (1958, and Maquieira (2009, which were also compared with the Brusov et al. (2015 developments. We collected stock prices for different highway concessionaires around the world from Google Finance and Reuters’ websites in order to determine the Beta of equity using a representative company. After that, we estimated the cost of equity considering Hamada (1969 and a Capital Asset Pricing Model. Then, we estimated the cost of capital using the cost of debt and the capital structure of Chile’s highway concessionaires. With all above, we were able to determine the Weighted Average Cost of Capital (WACC for highway concessions which ranges from 5.49 to 6.62%.

  3. Estimated Incident Cost Savings in Shipping Due to Inspections

    NARCIS (Netherlands)

    S. Knapp (Sabine); G.E. Bijwaard (Govert); C. Heij (Christiaan)

    2010-01-01

    textabstractThe effectiveness of safety inspections has been analysed from various angles, but until now, relatively little attention has been given to translate risk reduction into incident cost savings. This paper quantifies estimated cost savings based on port state control inspections and

  4. The application of cost behaviour and estimation in organisational ...

    African Journals Online (AJOL)

    Based on these findings, the paper recommends among others the need for the regular training of the management accountant in the modern methods of cost estimation, the need for accurate keeping of records of transactions and for long term forecasting of cost, management should rely on quantitative factors and ...

  5. Life cycle cost and risk estimation of environmental management options

    International Nuclear Information System (INIS)

    Shropshire, D.; Sherick, M.

    1996-01-01

    The evaluation process is demonstrated in this paper through comparative analysis of two alternative scenarios identified for the management of the alpha-contaminated fixed low-level waste currently stored at INEL. These two scenarios, the Base Case and the Delay Case, are realistic and based on actual data, but are not intended to exactly match actual plans currently being developed at INEL. Life cycle cost estimates were developed for both scenarios using the System Cost Model; resulting costs are presented and compared. Life cycle costs are shown as a function of time and also aggregated by pretreatment, treatment, storage, and disposal activities. Although there are some short-term cost savings for the Delay Case, cumulative life cycle costs eventually become much higher than costs for the Base Case over the same period of time, due mainly to the storage and repackaging necessary to accommodate the longer Delay Case schedule. Life cycle risk estimates were prepared using a new risk analysis method adapted to the System Cost Model architecture for automated, systematic cost/risk applications. Relative risk summaries are presented for both scenarios as a function of time and also aggregated by pretreatment, treatment, storage, and disposal activities. Relative risk of the Delay Case is shown to be higher than that of the Base Case. Finally, risk and cost results are combined to show how the collective information can be used to help identify opportunities for risk or cost reduction and highlight areas where risk reduction can be achieved most economically

  6. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  7. Multi-color light curves of type Ia supernovae on the color-magnitude diagram: A novel step toward more precise distance and extinction estimates

    International Nuclear Information System (INIS)

    Wang, Lifan; Goldhaber, Gerson; Aldering, Greg; Perlmutter, Saul

    2003-01-01

    We show empirically that fits to the color-magnitude relation of Type Ia supernovae after optical maximum can provide accurate relative extragalactic distances. We report the discovery of an empirical color relation for Type Ia light curves: During much of the first month past maximum, the magnitudes of Type Ia supernovae defined at a given value of color index have a very small magnitude dispersion; moreover, during this period the relation between B magnitude and B-V color (or B-Ror B-I color) is strikingly linear, to the accuracy of existing well-measured data. These linear relations can provide robust distance estimates, in particular, by using the magnitudes when the supernova reaches a given color. After correction for light curve stretch factor or decline rate, the dispersion of the magnitudes taken at the intercept of the linear color-magnitude relation are found to be around 0 m .08 for the sub-sample of supernovae with (B max - V max ) (le) 0 m 0.5, and around 0 m .11 for the sub-sample with (B max - V max ) (le) 0 m .2. This small dispersion is consistent with being mostly due to observational errors. The method presented here and the conventional light curve fitting methods can be combined to further improve statistical dispersions of distance estimates. It can be combined with the magnitude at maximum to deduce dust extinction. The slopes of the color-magnitude relation may also be used to identify intrinsically different SN Ia systems. The method provides a tool that is fundamental to using SN Ia to estimate cosmological parameters such as the Hubble constant and the mass and dark energy content of the universe

  8. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Energy Technology Data Exchange (ETDEWEB)

    Ruth, M.

    2011-10-01

    This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

  9. On Cost Estimate for Decommissioning of one Isotope Central

    International Nuclear Information System (INIS)

    Marek Vasko et al

    2010-08-01

    The main scope of this study has been to calculate the future cost for decommission and dismantling the Isotope central at the Studsvik site using the OMEGA CODE. Detailed empirical information is used in the study for 'bench-marking' purposes, in such cases when there is a need to supplement and correct field data from the industry. In the present study, data has been retrieved and organized such that the estimated costs for decommissioning of the Isotope Central become transparent and reliable. This approach gives a preliminary qualitative indication about the accuracy of the cost estimate delivered by the industry

  10. On Cost Estimate for Decommissioning of one Isotope Central

    Energy Technology Data Exchange (ETDEWEB)

    Marek Vasko et al

    2010-08-15

    The main scope of this study has been to calculate the future cost for decommission and dismantling the Isotope central at the Studsvik site using the OMEGA CODE. Detailed empirical information is used in the study for 'bench-marking' purposes, in such cases when there is a need to supplement and correct field data from the industry. In the present study, data has been retrieved and organized such that the estimated costs for decommissioning of the Isotope Central become transparent and reliable. This approach gives a preliminary qualitative indication about the accuracy of the cost estimate delivered by the industry

  11. Estimating the cost of disposal for Canada's nuclear fuel waste

    International Nuclear Information System (INIS)

    Ates, Y.

    1996-07-01

    Atomic Energy of Canada Ltd (AECL) prepared an Environmental Impact Statement and nine supporting Primary Reference Documents on the concept for disposal of Canada's nuclear fuel waste. This report summarizes the basis of the cost estimate which is provided in the primary reference document on engineering for a disposal facility. The scope of the cost estimate is explained by describing the key features of the disposal facility design, by noting the major assumptions made in preparing the estimates, and by listing the included and excluded cost components. An activity-based project planning and control method is explained whereby the project schedule, costs, and personnel requirements are interlinked; forming an integrated perspective on the total project life cycle. The summary and distribution of costs in each project stage by major facility or activity are presented. The results of studies which reviewed the overall cost estimate are also described. These studies indicate that, within the scope, the estimate is reasonable and compares well with similar international studies. (author)

  12. Computerized cost estimation spreadsheet and cost data base for fusion devices

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Rothe, K.E.

    1985-01-01

    Component design parameters (weight, surface area, etc.) and cost factors are input and direct and indirect costs are calculated. The cost data base file derived from actual cost experience within the fusion community and refined to be compatible with the spreadsheet costing approach is a catalog of cost coefficients, algorithms, and component costs arranged into data modules corresponding to specific components and/or subsystems. Each data module contains engineering, equipment, and installation labor cost data for different configurations and types of the specific component or subsystem. This paper describes the assumptions, definitions, methodology, and architecture incorporated in the development of the cost estimation spreadsheet and cost data base, along with the type of input required and the output format

  13. State-Level Estimates of Cancer-Related Absenteeism Costs

    Science.gov (United States)

    Tangka, Florence K.; Trogdon, Justin G.; Nwaise, Isaac; Ekwueme, Donatus U.; Guy, Gery P.; Orenstein, Diane

    2016-01-01

    Background Cancer is one of the top five most costly diseases in the United States and leads to substantial work loss. Nevertheless, limited state-level estimates of cancer absenteeism costs have been published. Methods In analyses of data from the 2004–2008 Medical Expenditure Panel Survey, the 2004 National Nursing Home Survey, the U.S. Census Bureau for 2008, and the 2009 Current Population Survey, we used regression modeling to estimate annual state-level absenteeism costs attributable to cancer from 2004 to 2008. Results We estimated that the state-level median number of days of absenteeism per year among employed cancer patients was 6.1 days and that annual state-level cancer absenteeism costs ranged from $14.9 million to $915.9 million (median = $115.9 million) across states in 2010 dollars. Absenteeism costs are approximately 6.5% of the costs of premature cancer mortality. Conclusions The results from this study suggest that lost productivity attributable to cancer is a substantial cost to employees and employers and contributes to estimates of the overall impact of cancer in a state population. PMID:23969498

  14. Cost Engineering Techniques and Their Applicability for Cost Estimation of Organic Rankine Cycle Systems

    Directory of Open Access Journals (Sweden)

    Sanne Lemmens

    2016-06-01

    Full Text Available The potential of organic Rankine cycle (ORC systems is acknowledged by both considerable research and development efforts and an increasing number of applications. Most research aims at improving ORC systems through technical performance optimization of various cycle architectures and working fluids. The assessment and optimization of technical feasibility is at the core of ORC development. Nonetheless, economic feasibility is often decisive when it comes down to considering practical instalments, and therefore an increasing number of publications include an estimate of the costs of the designed ORC system. Various methods are used to estimate ORC costs but the resulting values are rarely discussed with respect to accuracy and validity. The aim of this paper is to provide insight into the methods used to estimate these costs and open the discussion about the interpretation of these results. A review of cost engineering practices shows there has been a long tradition of industrial cost estimation. Several techniques have been developed, but the expected accuracy range of the best techniques used in research varies between 10% and 30%. The quality of the estimates could be improved by establishing up-to-date correlations for the ORC industry in particular. Secondly, the rapidly growing ORC cost literature is briefly reviewed. A graph summarizing the estimated ORC investment costs displays a pattern of decreasing costs for increasing power output. Knowledge on the actual costs of real ORC modules and projects remains scarce. Finally, the investment costs of a known heat recovery ORC system are discussed and the methodologies and accuracies of several approaches are demonstrated using this case as benchmark. The best results are obtained with factorial estimation techniques such as the module costing technique, but the accuracies may diverge by up to +30%. Development of correlations and multiplication factors for ORC technology in particular is

  15. A Cost Simulation Tool for Estimating the Cost of Operating Government Owned and Operated Ships

    Science.gov (United States)

    1994-09-01

    Horngren , C.T., Foster, G., Datar, S.M., Cost Accounting : A Management Emphasis, Prentice-Hall, Englewood Cliffs, NJ, 1994 IBM Corporation, A Graphical...4. TITLE AND SUBTITLE A COST SIMULATION TOOL FOR 5. FUNDING NUMBERS ESTIMATING THE COST OF OPERATING GOVERNMENT OWNED AND OPERATED SHIPS 6. AUTHOR( S ...normally does not present a problem to the accounting department. The final category, the cost of operating the government owned and operated ships is

  16. [Methodologies for estimating the indirect costs of traffic accidents].

    Science.gov (United States)

    Carozzi, Soledad; Elorza, María Eugenia; Moscoso, Nebel Silvana; Ripari, Nadia Vanina

    2017-01-01

    Traffic accidents generate multiple costs to society, including those associated with the loss of productivity. However, there is no consensus about the most appropriate methodology for estimating those costs. The aim of this study was to review methods for estimating indirect costs applied in crash cost studies. A thematic review of the literature was carried out between 1995 and 2012 in PubMed with the terms cost of illness, indirect cost, road traffic injuries, productivity loss. For the assessment of costs we used the the human capital method, on the basis of the wage-income lost during the time of treatment and recovery of patients and caregivers. In the case of premature death or total disability, the discount rate was applied to obtain the present value of lost future earnings. The computed years arose by subtracting to life expectancy at birth the average age of those affected who are not incorporated into the economically active life. The interest in minimizing the problem is reflected in the evolution of the implemented methodologies. We expect that this review is useful to estimate efficiently the real indirect costs of traffic accidents.

  17. Fuel Cell System for Transportation -- 2005 Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, D.

    2006-10-01

    Independent review report of the methodology used by TIAX to estimate the cost of producing PEM fuel cells using 2005 cell stack technology. The U.S. Department of Energy (DOE) Hydrogen, Fuel Cells and Infrastructure Technologies Program Manager asked the National Renewable Energy Laboratory (NREL) to commission an independent review of the 2005 TIAX cost analysis for fuel cell production. The NREL Systems Integrator is responsible for conducting independent reviews of progress toward meeting the DOE Hydrogen Program (the Program) technical targets. An important technical target of the Program is the proton exchange membrane (PEM) fuel cell cost in terms of dollars per kilowatt ($/kW). The Program's Multi-Year Program Research, Development, and Demonstration Plan established $125/kW as the 2005 technical target. Over the last several years, the Program has contracted with TIAX, LLC (TIAX) to produce estimates of the high volume cost of PEM fuel cell production for transportation use. Since no manufacturer is yet producing PEM fuel cells in the quantities needed for an initial hydrogen-based transportation economy, these estimates are necessary for DOE to gauge progress toward meeting its targets. For a PEM fuel cell system configuration developed by Argonne National Laboratory, TIAX estimated the total cost to be $108/kW, based on assumptions of 500,000 units per year produced with 2005 cell stack technology, vertical integration of cell stack manufacturing, and balance-of-plant (BOP) components purchased from a supplier network. Furthermore, TIAX conducted a Monte Carlo analysis by varying ten key parameters over a wide range of values and estimated with 98% certainty that the mean PEM fuel cell system cost would be below DOE's 2005 target of $125/kW. NREL commissioned DJW TECHNOLOGY, LLC to form an Independent Review Team (the Team) of industry fuel cell experts and to evaluate the cost estimation process and the results reported by TIAX. The results of

  18. Estimating the Cost of Providing Foundational Public Health Services.

    Science.gov (United States)

    Mamaril, Cezar Brian C; Mays, Glen P; Branham, Douglas Keith; Bekemeier, Betty; Marlowe, Justin; Timsina, Lava

    2017-12-28

    To estimate the cost of resources required to implement a set of Foundational Public Health Services (FPHS) as recommended by the Institute of Medicine. A stochastic simulation model was used to generate probability distributions of input and output costs across 11 FPHS domains. We used an implementation attainment scale to estimate costs of fully implementing FPHS. We use data collected from a diverse cohort of 19 public health agencies located in three states that implemented the FPHS cost estimation methodology in their agencies during 2014-2015. The average agency incurred costs of $48 per capita implementing FPHS at their current attainment levels with a coefficient of variation (CV) of 16 percent. Achieving full FPHS implementation would require $82 per capita (CV=19 percent), indicating an estimated resource gap of $34 per capita. Substantial variation in costs exists across communities in resources currently devoted to implementing FPHS, with even larger variation in resources needed for full attainment. Reducing geographic inequities in FPHS may require novel financing mechanisms and delivery models that allow health agencies to have robust roles within the health system and realize a minimum package of public health services for the nation. © Health Research and Educational Trust.

  19. Estimating Drilling Cost and Duration Using Copulas Dependencies Models

    Directory of Open Access Journals (Sweden)

    M. Al Kindi

    2017-03-01

    Full Text Available Estimation of drilling budget and duration is a high-level challenge for oil and gas industry. This is due to the many uncertain activities in the drilling procedure such as material prices, overhead cost, inflation, oil prices, well type, and depth of drilling. Therefore, it is essential to consider all these uncertain variables and the nature of relationships between them. This eventually leads into the minimization of the level of uncertainty and yet makes a "good" estimation points for budget and duration given the well type. In this paper, the copula probability theory is used in order to model the dependencies between cost/duration and MRI (mechanical risk index. The MRI is a mathematical computation, which relates various drilling factors such as: water depth, measured depth, true vertical depth in addition to mud weight and horizontal displacement. In general, the value of MRI is utilized as an input for the drilling cost and duration estimations. Therefore, modeling the uncertain dependencies between MRI and both cost and duration using copulas is important. The cost and duration estimates for each well were extracted from the copula dependency model where research study simulate over 10,000 scenarios. These new estimates were later compared to the actual data in order to validate the performance of the procedure. Most of the wells show moderate - weak relationship of MRI dependence, which means that the variation in these wells can be related to MRI but to the extent that it is not the primary source.

  20. Cost estimation model for advanced planetary programs, fourth edition

    Science.gov (United States)

    Spadoni, D. J.

    1983-01-01

    The development of the planetary program cost model is discussed. The Model was updated to incorporate cost data from the most recent US planetary flight projects and extensively revised to more accurately capture the information in the historical cost data base. This data base is comprised of the historical cost data for 13 unmanned lunar and planetary flight programs. The revision was made with a two fold objective: to increase the flexibility of the model in its ability to deal with the broad scope of scenarios under consideration for future missions, and to maintain and possibly improve upon the confidence in the model's capabilities with an expected accuracy of 20%. The Model development included a labor/cost proxy analysis, selection of the functional forms of the estimating relationships, and test statistics. An analysis of the Model is discussed and two sample applications of the cost model are presented.

  1. Estimating productivity costs using the friction cost approach in practice: a systematic review.

    Science.gov (United States)

    Kigozi, Jesse; Jowett, Sue; Lewis, Martyn; Barton, Pelham; Coast, Joanna

    2016-01-01

    The choice of the most appropriate approach to valuing productivity loss has received much debate in the literature. The friction cost approach has been proposed as a more appropriate alternative to the human capital approach when valuing productivity loss, although its application remains limited. This study reviews application of the friction cost approach in health economic studies and examines how its use varies in practice across different country settings. A systematic review was performed to identify economic evaluation studies that have estimated productivity costs using the friction cost approach and published in English from 1996 to 2013. A standard template was developed and used to extract information from studies meeting the inclusion criteria. The search yielded 46 studies from 12 countries. Of these, 28 were from the Netherlands. Thirty-five studies reported the length of friction period used, with only 16 stating explicitly the source of the friction period. Nine studies reported the elasticity correction factor used. The reported friction cost approach methods used to derive productivity costs varied in quality across studies from different countries. Few health economic studies have estimated productivity costs using the friction cost approach. The estimation and reporting of productivity costs using this method appears to differ in quality by country. The review reveals gaps and lack of clarity in reporting of methods for friction cost evaluation. Generating reporting guidelines and country-specific parameters for the friction cost approach is recommended if increased application and accuracy of the method is to be realized.

  2. Development of Cost Estimation Methodology of Decommissioning for PWR

    International Nuclear Information System (INIS)

    Lee, Sang Il; Yoo, Yeon Jae; Lim, Yong Kyu; Chang, Hyeon Sik; Song, Geun Ho

    2013-01-01

    The permanent closure of nuclear power plant should be conducted with the strict laws and the profound planning including the cost and schedule estimation because the plant is very contaminated with the radioactivity. In Korea, there are two types of the nuclear power plant. One is the pressurized light water reactor (PWR) and the other is the pressurized heavy water reactor (PHWR) called as CANDU reactor. Also, the 50% of the operating nuclear power plant in Korea is the PWRs which were originally designed by CE (Combustion Engineering). There have been experiences about the decommissioning of Westinghouse type PWR, but are few experiences on that of CE type PWR. Therefore, the purpose of this paper is to develop the cost estimation methodology and evaluate technical level of decommissioning for the application to CE type PWR based on the system engineering technology. The aim of present study is to develop the cost estimation methodology of decommissioning for application to PWR. Through the study, the following conclusions are obtained: · Based on the system engineering, the decommissioning work can be classified as Set, Subset, Task, Subtask and Work cost units. · The Set and Task structure are grouped as 29 Sets and 15 Task s, respectively. · The final result shows the cost and project schedule for the project control and risk management. · The present results are preliminary and should be refined and improved based on the modeling and cost data reflecting available technology and current costs like labor and waste data

  3. Methodology used in IRSN nuclear accident cost estimates in France

    International Nuclear Information System (INIS)

    2015-01-01

    This report describes the methodology used by IRSN to estimate the cost of potential nuclear accidents in France. It concerns possible accidents involving pressurized water reactors leading to radioactive releases in the environment. These accidents have been grouped in two accident families called: severe accidents and major accidents. Two model scenarios have been selected to represent each of these families. The report discusses the general methodology of nuclear accident cost estimation. The crucial point is that all cost should be considered: if not, the cost is underestimated which can lead to negative consequences for the value attributed to safety and for crisis preparation. As a result, the overall cost comprises many components: the most well-known is offsite radiological costs, but there are many others. The proposed estimates have thus required using a diversity of methods which are described in this report. Figures are presented at the end of this report. Among other things, they show that purely radiological costs only represent a non-dominant part of foreseeable economic consequences. (authors)

  4. Patient-physician discussions about costs: definitions and impact on cost conversation incidence estimates.

    Science.gov (United States)

    Hunter, Wynn G; Hesson, Ashley; Davis, J Kelly; Kirby, Christine; Williamson, Lillie D; Barnett, Jamison A; Ubel, Peter A

    2016-03-31

    Nearly one in three Americans are financially burdened by their medical expenses. To mitigate financial distress, experts recommend routine physician-patient cost conversations. However, the content and incidence of these conversations are unclear, and rigorous definitions are lacking. We sought to develop a novel set of cost conversation definitions, and determine the impact of definitional variation on cost conversation incidence in three clinical settings. Retrospective, mixed-methods analysis of transcribed dialogue from 1,755 outpatient encounters for routine clinical management of breast cancer, rheumatoid arthritis, and depression, occurring between 2010-2014. We developed cost conversation definitions using summative content analysis. Transcripts were evaluated independently by at least two members of our multi-disciplinary team to determine cost conversation incidence using each definition. Incidence estimates were compared using Pearson's Chi-Square Tests. Three cost conversation definitions emerged from our analysis: (a) Out-of-Pocket (OoP) Cost--discussion of the patient's OoP costs for a healthcare service; (b) Cost/Coverage--discussion of the patient's OoP costs or insurance coverage; (c) Cost of Illness- discussion of financial costs or insurance coverage related to health or healthcare. These definitions were hierarchical; OoP Cost was a subset of Cost/Coverage, which was a subset of Cost of Illness. In each clinical setting, we observed significant variation in the incidence of cost conversations when using different definitions; breast oncology: 16, 22, 24% of clinic visits contained cost conversation (OOP Cost, Cost/Coverage, Cost of Illness, respectively; P cost conversation varied significantly depending on the definition used. Our findings and proposed definitions may assist in retrospective interpretation and prospective design of investigations on this topic.

  5. Estimated Cost to a Restaurant of a Foodborne Illness Outbreak.

    Science.gov (United States)

    Bartsch, Sarah M; Asti, Lindsey; Nyathi, Sindiso; Spiker, Marie L; Lee, Bruce Y

    Although outbreaks of restaurant-associated foodborne illness occur periodically and make the news, a restaurant may not be aware of the cost of an outbreak. We estimated this cost under varying circumstances. We developed a computational simulation model; scenarios varied outbreak size (5 to 250 people affected), pathogen (n = 15), type of dining establishment (fast food, fast casual, casual dining, and fine dining), lost revenue (ie, meals lost per illness), cost of lawsuits and legal fees, fines, and insurance premium increases. We estimated that the cost of a single foodborne illness outbreak ranged from $3968 to $1.9 million for a fast-food restaurant, $6330 to $2.1 million for a fast-casual restaurant, $8030 to $2.2 million for a casual-dining restaurant, and $8273 to $2.6 million for a fine-dining restaurant, varying from a 5-person outbreak, with no lost revenue, lawsuits, legal fees, or fines, to a 250-person outbreak, with high lost revenue (100 meals lost per illness), and a high amount of lawsuits and legal fees ($1 656 569) and fines ($100 000). This cost amounts to 10% to 5790% of a restaurant's annual marketing costs and 0.3% to 101% of annual profits and revenue. The biggest cost drivers were lawsuits and legal fees, outbreak size, and lost revenue. Pathogen type affected the cost by a maximum of $337 000, the difference between a Bacillus cereus outbreak (least costly) and a listeria outbreak (most costly). The cost of a single foodborne illness outbreak to a restaurant can be substantial and outweigh the typical costs of prevention and control measures. Our study can help decision makers determine investment and motivate research for infection-control measures in restaurant settings.

  6. Estimating remediation costs for the Montclair radium superfund sites

    International Nuclear Information System (INIS)

    Turner, M.J.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, NJ, are contaminated to varying degrees with radioactive materials. The waste originated from radium processing facilities prevalent in the area during the early 1900s. The design for remediation of these sites is managed by Bechtel National, Inc. on behalf of the United States Army Corps of Engineers, Kansas City District, which administers the project through an interagency agreement with the US Environmental Protection Agency (EPA). Design efforts for the project began in 1990. A portion of the scope, which is the topic of this article, was preparing the remediation costs estimates. These estimates were to be prepared from the detailed design packages; the Corps of Engineers required that the estimates were prepared using the Micro Computer-Aided Cost Estimating System (MCACES). This article discusses the design methods used, provides an overview of MCACES, and discusses the structure and preparation of the cost estimate and its uses. However, the main focus of the article is the methods used to generate the required project-specific cost estimate format for this project. 6 figs

  7. Cost estimates to guide manufacturing of composite waved beam

    International Nuclear Information System (INIS)

    Ye Jinrui; Zhang Boming; Qi Haiming

    2009-01-01

    A cost estimation model on the basis of manufacturing process has been presented. In the model, the effects of the material, labor, tool and equipment were discussed, and the corresponding formulas were provided. A method of selecting estimation variables has been provided based on a case study of composite waved beam using autoclave cure. The model parameters related to the process time estimation of the lay-up procedure were analyzed and modified for different part configurations. The result shows that there is little error while comparing the estimated process time with the practical one. The model is verified to be applicable to guide the design and manufacturing of the composite material

  8. The cost of Alzheimer's disease in China and re-estimation of costs worldwide.

    Science.gov (United States)

    Jia, Jianping; Wei, Cuibai; Chen, Shuoqi; Li, Fangyu; Tang, Yi; Qin, Wei; Zhao, Lina; Jin, Hongmei; Xu, Hui; Wang, Fen; Zhou, Aihong; Zuo, Xiumei; Wu, Liyong; Han, Ying; Han, Yue; Huang, Liyuan; Wang, Qi; Li, Dan; Chu, Changbiao; Shi, Lu; Gong, Min; Du, Yifeng; Zhang, Jiewen; Zhang, Junjian; Zhou, Chunkui; Lv, Jihui; Lv, Yang; Xie, Haiqun; Ji, Yong; Li, Fang; Yu, Enyan; Luo, Benyan; Wang, Yanjiang; Yang, Shanshan; Qu, Qiumin; Guo, Qihao; Liang, Furu; Zhang, Jintao; Tan, Lan; Shen, Lu; Zhang, Kunnan; Zhang, Jinbiao; Peng, Dantao; Tang, Muni; Lv, Peiyuan; Fang, Boyan; Chu, Lan; Jia, Longfei; Gauthier, Serge

    2018-04-01

    The socioeconomic costs of Alzheimer's disease (AD) in China and its impact on global economic burden remain uncertain. We collected data from 3098 patients with AD in 81 representative centers across China and estimated AD costs for individual patient and total patients in China in 2015. Based on this data, we re-estimated the worldwide costs of AD. The annual socioeconomic cost per patient was US $19,144.36, and total costs were US $167.74 billion in 2015. The annual total costs are predicted to reach US $507.49 billion in 2030 and US $1.89 trillion in 2050. Based on our results, the global estimates of costs for dementia were US $957.56 billion in 2015, and will be US $2.54 trillion in 2030, and US $9.12 trillion in 2050, much more than the predictions by the World Alzheimer Report 2015. China bears a heavy burden of AD costs, which greatly change the estimates of AD cost worldwide. Copyright © 2017 the Alzheimer's Association. Published by Elsevier Inc. All rights reserved.

  9. The Software Cost Estimation Method Based on Fuzzy Ontology

    Directory of Open Access Journals (Sweden)

    Plecka Przemysław

    2014-12-01

    Full Text Available In the course of sales process of Enterprise Resource Planning (ERP Systems, it turns out that the standard system must be extended or changed (modified according to specific customer’s requirements. Therefore, suppliers face the problem of determining the cost of additional works. Most methods of cost estimation bring satisfactory results only at the stage of pre-implementation analysis. However, suppliers need to know the estimated cost as early as at the stage of trade talks. During contract negotiations, they expect not only the information about the costs of works, but also about the risk of exceeding these costs or about the margin of safety. One method that gives more accurate results at the stage of trade talks is the method based on the ontology of implementation costs. This paper proposes modification of the method involving the use of fuzzy attributes, classes, instances and relations in the ontology. The result provides not only the information about the value of work, but also about the minimum and maximum expected cost, and the most likely range of costs. This solution allows suppliers to effectively negotiate the contract and increase the chances of successful completion of the project.

  10. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  11. Fusion reactor design studies: standard accounts for cost estimates

    International Nuclear Information System (INIS)

    Schulte, S.C.; Willke, T.L.; Young, J.R.

    1978-05-01

    The fusion reactor design studies--standard accounts for cost estimates provides a common format from which to assess the economic character of magnetically confined fusion reactor design concepts. The format will aid designers in the preparation of design concept costs estimates and also provide policymakers with a tool to assist in appraising which design concept may be economically promising. The format sets forth a categorization and accounting procedure to be used when estimating fusion reactor busbar energy cost that can be easily and consistently applied. Reasons for developing the procedure, explanations of the procedure, justifications for assumptions made in the procedure, and the applicability of the procedure are described in this document. Adherence to the format when evaluating prospective fusion reactor design concepts will result in the identification of the more promising design concepts thus enabling the fusion power alternatives with better economic potential to be quickly and efficiently developed

  12. A Deterministic and Probabilistic Cost Estimate for Nuclear Power Plants

    International Nuclear Information System (INIS)

    Ha, Gag Kyeon; Kwon, Jong Jooh

    2005-01-01

    There are many cost estimate methodologies for some future projects. Revenue Requirement Method (RRM), Cost/Benefit Ratio method, Return on Investment, Pay Back Period Method. etc. This paper uses the RRM method which is the amount of revenue that must be collected from customers to compensate a utility for all expenditures associated with implementing an alternative decision involving money. This RRM can be combined with a random sampling statistical simulation computer program to calculated the Probability Distribution Functions(PDF) of the cost elements for generating cost. EPRI developed this combined statistical techniques into RRM, named Statistical Revenue Requirement Method(SRRM). The statistical technique is a random sampling statistical simulation. The simulation tool is usually Monte Carlo sampling, Latin Latin Hypercube sampling, etc. SRRM is used to estimating for future power plants, apartments, hospital, marketing, etc. In this paper, RRM calculation and SRRM simulation have been practiced for PWR1400MWe nuclear power plants

  13. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  14. Regional economic activity and absenteeism: a new approach to estimating the indirect costs of employee productivity loss.

    Science.gov (United States)

    Bankert, Brian; Coberley, Carter; Pope, James E; Wells, Aaron

    2015-02-01

    This paper presents a new approach to estimating the indirect costs of health-related absenteeism. Productivity losses related to employee absenteeism have negative business implications for employers and these losses effectively deprive the business of an expected level of employee labor. The approach herein quantifies absenteeism cost using an output per labor hour-based method and extends employer-level results to the region. This new approach was applied to the employed population of 3 health insurance carriers. The economic cost of absenteeism was estimated to be $6.8 million, $0.8 million, and $0.7 million on average for the 3 employers; regional losses were roughly twice the magnitude of employer-specific losses. The new approach suggests that costs related to absenteeism for high output per labor hour industries exceed similar estimates derived from application of the human capital approach. The materially higher costs under the new approach emphasize the importance of accurately estimating productivity losses.

  15. Estimating the mental health costs of racial discrimination

    Directory of Open Access Journals (Sweden)

    Amanuel Elias

    2016-11-01

    Full Text Available Abstract Background Racial discrimination is a pervasive social problem in several advanced countries such as the U.S., U.K., and Australia. Public health research also indicates a range of associations between exposure to racial discrimination and negative health, particularly, mental health including depression, anxiety, and post-traumatic stress disorder (PTSD. However, the direct negative health impact of racial discrimination has not been costed so far although economists have previously estimated indirect non-health related productivity costs. In this study, we estimate the burden of disease due to exposure to racial discrimination and measure the cost of this exposure. Methods Using prevalence surveys and data on the association of racial discrimination with health outcomes from a global meta-analysis, we apply a cost of illness method to measure the impact of racial discrimination. This estimate indicates the direct health cost attributable to racial discrimination and we convert the estimates to monetary values based on conventional parameters. Results Racial discrimination costs the Australian economy 235,452 in disability adjusted life years lost, equivalent to $37.9 billion per annum, roughly 3.02% of annual gross domestic product (GDP over 2001–11, indicating a sizeable loss for the economy. Conclusion Substantial cost is incurred due to increased prevalence of racial discrimination as a result of its association with negative health outcomes (e.g. depression, anxiety and PTSD. This implies that potentially significant cost savings can be made through measures that target racial discrimination. Our research contributes to the debate on the social impact of racial discrimination, with implications for policies and efforts addressing it.

  16. Estimating the Cost for Executing Business Processes in the Cloud

    OpenAIRE

    Vincenzo Ferme; Ana Ivanchikj; Cesare Pautasso

    2016-01-01

    Managing and running business processes in the Cloud changes how Workflow Management Systems (WfMSs) are deployed. Consequently when designing such WfMSs there is a need of determining the sweet spot in the performance vs. resource consumption trade off. While all Cloud providers agree on the pay as you go resource consumption model every provider uses a different cost model to gain a competitive edge. In this paper we present a novel method for estimating the infrastructure costs of running ...

  17. Applying Insights from Transaction Cost Economics (TCE) to Improve DoD Cost Estimation

    National Research Council Canada - National Science Library

    Angelis, Diana I; Dillard, John; Franck, Raymond; Melese, Francois

    2007-01-01

    The purpose of this report is to explore the possibility of improving DoD cost estimation methods by including explanatory variables that capture the coordination and motivation problems associated with the program...

  18. Is 27 a Big Number? Correlational and Causal Connections among Numerical Categorization, Number Line Estimation, and Numerical Magnitude Comparison

    Science.gov (United States)

    Laski, Elida V.; Siegler, Robert S.

    2007-01-01

    This study examined the generality of the logarithmic to linear transition in children's representations of numerical magnitudes and the role of subjective categorization of numbers in the acquisition of more advanced understanding. Experiment 1 (49 girls and 41 boys, ages 5-8 years) suggested parallel transitions from kindergarten to second grade…

  19. Multi-color light curves of type Ia supernovae on thecolor-magnitude diagram: A novel step toward more precise distance andextinction estimates

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Lifan; Goldhaber, Gerson; Aldering, Greg; Perlmutter, Saul

    2003-01-31

    We show empirically that fits to the color-magnituderelation of Type Ia supernovae after optical maximum can provide accuraterelative extragalactic distances. We report the discovery of an empiricalcolor relation for Type Ia light curves: During much of the first monthpast maximum, the magnitudes of Type Ia supernovae defined at a givenvalue of color index have a very small magnitude dispersion; moreover,during this period the relation between B magnitude and B-V color (or B-Ror B-I color) is strikingly linear, to the accuracy of existingwell-measured data. These linear relations can provide robust distanceestimates, in particular, by using the magnitudes when the supernovareaches a given color. After correction for light curve stretch factor ordecline rate, the dispersion of the magnitudes taken at the intercept ofthe linear color-magnitude relation are found to be around 0^m .08 forthe sub-sample of supernovae with (B_max - V_max) ?= 0^m 0.5, andaround 0^m.11 for the sub-sample with (B_max - V_max) ?= 0^m .2.This small dispersion is consistent with being mostly due toobservational errors. The method presented here and the conventionallight curve fitting methods can be combined to further improvestatistical dispersions of distance estimates. It can be combined withthe magnitude at maximum to deduce dust extinction. Theslopes of thecolor-magnitude relation may also be used to identify intrinsicallydifferent SN Ia systems. The method provides a tool that is fundamentalto using SN Ia to estimate cosmological parameters such as the Hubbleconstant and the mass and dark energy content of theuniverse.

  20. Radium removal processes capital and operating cost estimates

    International Nuclear Information System (INIS)

    Kelly, F.J.

    1979-09-01

    An estimate of the fixed capital and operating costs for two alternative processes for the removal of dissolved Ra-226 from uranium mill effluent in Elliot Lake, Ontario is presented. Process 1 consists of barium-radium coprecipitation followed by coagulation, flocculation and sedimentation. Process 2 consists of barium-radium coprecipitation followed by gravity media filtration, sand filter backwashing and sedimentation. Cost estimates were prepared for 18 different plant configurations designed to treat 1000 and 4000 imperial gallons per minute (ig/m) of effluent, 24 hrs per day, 7 days per week and 365 days per year with several equipment options. The estimated fixed capital costs for plants equipped with gravity filters were less than those equipped with circular clarifiers. The capital costs ranged from $552,000 with a flow rate of 1000 ig/m to $2,578,000 with a flow rate of 4000 ig/m. Estimated annual operating costs, based on a plant life of 10 years, ranged from $298,000 with a flow rate of 1000 ig/m to $1,061,000 with a flow rate of 4000 ig/m

  1. 2011 Van earthquake (Mw=7.2) aftershocks using the source spectra an approach to real-time estimation of moment magnitude

    Science.gov (United States)

    Meral Ozel, N.; Kusmezer, A.

    2012-04-01

    The Converging Grid Search (CGS) algorithm was tested on broadband waveforms data from large aftershocks of the October 23, Van earthquake with the hypocentral distances within 0-300 km over a magnitude range of 4.0≤M≤5.6.Observed displacement spectra were virtually well adapted to the Brune's source model in the whole frequency range for many waveforms.The estimated Mw solutions were compared to global CMT catalogue solutions, and were seen to be in good agreement. To estimate Mw from a shear-wave displacement spectrum, an automatic routine named as CGS was applied to attempt to test and develop a method for stable moment magnitude estimation to be used as a real-time operation.The spectra were corrected for average an elastic attenuation and geometrical spreading factors and then were scaled to compute moment at the long period asymptote where the spectral plateau for 0 Hz is flat.For this aim, an automatic procedure was utilized: 1)calculating the displacement spectra for vertical components at a given station, 2)estimating corner frequency and seismic moment using CGS which is based on minimizing the differences between observed and synthetic source spectra, 3)calculating moment magnitude from seismic moment for each station separately, and then are averaged to give the mean values of each event. The best fitting iteration of these parameters was obtained after a few seconds. The noise spectrum was also computed to suggest a comparison between signals to noise ratio before performing the inversion.Weak events with low SNR were excluded from the computations. The method examined on the Van earthquake aftershock dataset proved that it is applicable to have stable and reliable estimates of magnitude for the routine processing within a few seconds from the initial P wave detection though the location estimation is necessary.This allows a fast determination of Mw magnitude and assist to measure physical quantities of the source available for the real time

  2. Valuing productivity costs in a changing macroeconomic environment: the estimation of colorectal cancer productivity costs using the friction cost approach.

    Science.gov (United States)

    Hanly, Paul; Koopmanschap, Marc; Sharp, Linda

    2016-06-01

    The friction cost approach (FCA) has been proposed as an alternative to the human capital approach for productivity cost valuation. However, FCA estimates are context dependent and influenced by extant macroeconomic conditions. We applied the FCA to estimate colorectal cancer labor productivity costs and assessed the impact of a changing macroeconomic environment on these estimates. Data from colorectal cancer survivors (n = 159) derived from a postal survey undertaken in Ireland March 2010 to January 2011 were combined with national wage data, population-level survival data, and occupation-specific friction periods to calculate temporary and permanent disability, and premature mortality costs using the FCA. The effects of changing labor market conditions between 2006 and 2013 on the friction period were modeled in scenario analyses. Costs were valued in 2008 euros. In the base-case, the total FCA per-person productivity cost for incident colorectal cancer patients of working age at diagnosis was €8543. In scenario 1 (a 2.2 % increase in unemployment), the fall in the friction period caused total productivity costs to decrease by up to 18 % compared to base-case estimates. In scenario 2 (a 9.2 % increase in unemployment), the largest decrease in productivity cost was up to 65 %. Adjusting for the vacancy rate reduced the effect of unemployment on the cost results. The friction period used in calculating labor productivity costs greatly affects the derived estimates; this friction period requires reassessment following changes in labor market conditions. The influence of changes in macroeconomic conditions on FCA-derived cost estimates may be substantial.

  3. Cost estimation of interim dry storage for Atucha I NPP

    International Nuclear Information System (INIS)

    Bergallo, Juan E.; Fuenzalida Troyano, Carlos S.

    2007-01-01

    A joint effort between NASA and CNEA has been performed in order to evaluate and fix the strategy of interim spent fuel storage for Atucha I nuclear power plant. In this work the cost estimation on the proposed system was performed in order to fix the parameter and design criteria for the next engineering step. The main results achieved show that both alternatives are all in the same range of costs per unit of mass to be stored, the impact on electricity cost is less than 1 US mills/KWh and the scaling factor achieved is 0.85. (author) [es

  4. Estimation of cost and value of energy from wind turbines

    International Nuclear Information System (INIS)

    Tande, J.O.; Fransden, S.

    1995-01-01

    The International Energy Agency expert group on recommended practices for wind turbine testing and evaluation is finalizing a second edition of the E stimation of cost of energy from wind energy conversion systems . This paper summarizes those recommendations. Further, the value of wind energy in terms of the associated savings is discussed, and a case study is undertaken to illustrate wind energy cost/benefit analyses. The paper concludes that while the recommended practices on cost estimation may be useful in connection with wind energy feasibility studies there is still a need for further international agreement upon guidelines on how to assess wind energy benefits. (author)

  5. A Descriptive Evaluation of Automated Software Cost-Estimation Models,

    Science.gov (United States)

    1986-10-01

    Version 1.03D) * PCOC (Version 7.01) - PRICE S • SLIM (Version 1.1) • SoftCost (Version 5. 1) * SPQR /20 (Version 1. 1) - WICOMO (Version 1.3) These...produce detailed GANTT and PERT charts. SPQR /20 is based on a cost model developed at ITT. In addition to cost, schedule, and staffing estimates, it...cases and test runs required, and the effectiveness of pre-test and test activities. SPQR /20 also predicts enhancement and maintenance activities. C

  6. Estimating the Cost of Youth Disengagement in New Zealand

    OpenAIRE

    Gail Pacheco; Jessica Dye

    2013-01-01

    Youth exclusion, disengagement, and overall underutilisation in the labour market has short term costs to the economy, as well as long term impacts on society. In this research we project the loss to productivity, measured in foregone wages, and the expected cost to public finances for NZ and Auckland youth aged 15-24 not in employment, education, or training (collectively known as NEET). We estimate the expected per capita cost of each NEET youth in NZ is approximately $26,847 over the next ...

  7. Magnitude of Neck-Surface Vibration as an Estimate of Subglottal Pressure during Modulations of Vocal Effort and Intensity in Healthy Speakers

    Science.gov (United States)

    McKenna, Victoria S.; Llico, Andres F.; Mehta, Daryush D.; Perkell, Joseph S.; Stepp, Cara E.

    2017-01-01

    Purpose: This study examined the relationship between the magnitude of neck-surface vibration (NSV[subscript Mag]; transduced with an accelerometer) and intraoral estimates of subglottal pressure (P'[subscript sg]) during variations in vocal effort at 3 intensity levels. Method: Twelve vocally healthy adults produced strings of /p?/ syllables in 3…

  8. A Comparative Test of the Interval-Scale Properties of Magnitude Estimation and Case III Scaling and Recommendations for Equal-Interval Frequency Response Anchors.

    Science.gov (United States)

    Schriesheim, Chester A.; Novelli, Luke, Jr.

    1989-01-01

    Differences between recommended sets of equal-interval response anchors derived from scaling techniques using magnitude estimations and Thurstone Case III pair-comparison treatment of complete ranks were compared. Differences in results for 205 undergraduates reflected differences in the samples as well as in the tasks and computational…

  9. Cost estimation for decommissioning: a review of current practice

    International Nuclear Information System (INIS)

    O'Sullivan, P.; Pescatore, C.

    2009-01-01

    It is now common practice for decommissioning plans and associated cost estimates to be prepared for all nuclear installations. Specific requirements are generally set out in regulations that have their basis in national legislation. These estimates are important for ensuring that the necessary funds are being collected to cover the actual costs of decommissioning the facility. The long time horizon for both amassing and disbursing these funds is a particular concern for national authorities. It is thus important to maintain a realistic estimate of the liabilities involved and to confirm the adequacy of the provisions to discharge them over time. Estimates of decommissioning costs have been performed and published by many organisations for many different purposes and applications. The results often vary because of differences in basic assumptions such as the choice of the decommissioning strategy (immediate vs. deferred), the availability of waste management pathways, the assumed end states of installations, the detailed definition of cost items, technical uncertainties, unforeseen events, the evolution of regulation and requirements. Many of these differences may be unavoidable since a reasonable degree of reliability and accuracy can only be achieved by developing decommissioning cost estimates on a case-by-case, site-specific basis. Moreover, even if considerable efforts are made to obtain reliable estimates, unforeseen events may cause estimates to go wrong. The issue of how to deal with uncertainties is therefore an important one, leading in turn to the need for risk management in terms of making adequate funding provisions. In March 2008, a questionnaire was circulated among the organisations participating in the NEA Decommissioning and Cost Estimation Group (DCEG). Information was collected on legal requirements and the responsibilities of the main parties concerned with the preparation and oversight of cost estimates, the main cost elements and associated

  10. The estimated magnitude of AIDS in Brazil: a delay correction applied to cases with lost dates Estimativa da magnitude da AIDS no Brasil: uma correção de atraso aplicada aos casos com data perdida

    Directory of Open Access Journals (Sweden)

    Maria Tereza S. Barbosa

    2002-02-01

    Full Text Available The number of HIV-infected people is an important measure of the magnitude of the AIDS epidemic in Brazil and allows for comparison with epidemic patterns in other countries. This quantity can be estimated from the number of reported AIDS cases, which in turn needs to be corrected for the distribution of reporting delays and under-recording of cases. These distributions are unknown and must also be estimated from the recorded dates, which were missed to the Brazilian National AIDS registry. This paper estimates the number of AIDS cases diagnosed by imputing the lost information based on an estimate of the pattern in registration delay until 1996. We first fitted a non-stationary bivariate Poisson regression model to estimate the pattern in reporting delay. In the subsequent steps these models were applied to impute new data, thus replacing the missing information, and to estimate the magnitude of the AIDS epidemic in the country. Model estimates ranged from 36,000 to 50,000 AIDS cases diagnosed in Brazil and still unreported. Therefore, the epidemic was 20 to 30% greater than known from the available information as of February 1999. To be useful to health policy-makers, the surveillance system based on officially reported AIDS cases must be continuously improved.O número de pessoas infectadas pelo HIV é uma importante medida da magnitude da epidemia de AIDS no Brasil, e permite a comparação com o padrão epidêmico de outros países. Essa quantidade pode ser estimada a partir do número de casos notificados de AIDS, que necessita ser corrigido pela distribuição do atraso da notificação e pelas sub-notificações. Essas distribuições são desconhecidas e devem ser estimadas a partir das datas registradas, que no Brasil foram perdidas. Neste artigo, estima-se o número de diagnósticos de AIDS, imputando as informações perdidas a partir da estimativa do padrão de atraso até 1996. Primeiro, ajustou-se uma regressão de Poisson

  11. Preliminary Cost Estimates for Nuclear Hydrogen Production: HTSE System

    International Nuclear Information System (INIS)

    Yang, K. J.; Lee, K. Y.; Lee, T. H.

    2008-01-01

    KAERI is now focusing on the research and development of the key technologies required for the design and realization of a nuclear hydrogen production system. As a preliminary study of cost estimates for nuclear hydrogen systems, the hydrogen production costs of the nuclear energy sources benchmarking GTMHR and PBMR are estimated in the necessary input data on a Korean specific basis. G4-ECONS was appropriately modified to calculate the cost for hydrogen production of HTSE (High Temperature Steam Electrolysis) process with VHTR (Very High Temperature nuclear Reactor) as a thermal energy source. The estimated costs presented in this paper show that hydrogen production by the VHTR could be competitive with current techniques of hydrogen production from fossil fuels if CO 2 capture and sequestration is required. Nuclear production of hydrogen would allow large-scale production of hydrogen at economic prices while avoiding the release of CO 2 . Nuclear production of hydrogen could thus become the enabling technology for the hydrogen economy. The major factors that would affect the cost of hydrogen were also discussed

  12. Estimated annual cost of arterial hypertension treatment in Brazil.

    Science.gov (United States)

    Dib, Murilo W; Riera, Rachel; Ferraz, Marcos B

    2010-02-01

    To estimate the direct annual cost of systemic arterial hypertension (SAH) treatment in Brazil's public and private health care systems, assess its economic impact on the total health care budget, and determine its proportion of the 2005 gross domestic product (GDP). A decision tree model was used to determine direct costs based on estimated use of various resources in SAH diagnosis and care, including treatment (medication and non-medication), complementary exams, doctor visits, nutritional assessments, and emergency room visits. Estimated direct annual cost of SAH treatment was approximately US$ 398.9 million for the public health care system and US$ 272.7 million for the private system, representing 0.08% of the 2005 GDP (ranging from 0.05% to 0.16%). With total health care expenses comprising about 7.6% of Brazil's GDP, this cost represented 1.11% of overall health care costs (0.62% to 2.06%)-1.43% of total expenses for the Unified Healthcare System (Sistema Unico de Saúde, SUS) (0.79% to 2.75%) and 0.83% of expenses for the private health care system (0.47% to 1.48%). Conclusion. To guarantee public or private health care based on the principles of universality and equality, with limited available resources, efforts must be focused on educating the population on prevention and treatment compliance in diseases such as SAH that require significant health resources.

  13. Stochastic Estimation of Cost Frontier: Evidence from Bangladesh

    Science.gov (United States)

    Mamun, Shamsul Arifeen Khan

    2012-01-01

    In the literature of higher education cost function study, enough knowledge is created in the area of economy scale in the context of developed countries but the knowledge of input demand is lacking. On the other hand, empirical knowledge in the context of developing countries is very meagre. The paper fills up the knowledge gap, estimating a…

  14. A Semantics-Based Approach to Construction Cost Estimating

    Science.gov (United States)

    Niknam, Mehrdad

    2015-01-01

    A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…

  15. An Application of Data Mining Algorithms for Shipbuilding Cost Estimation

    NARCIS (Netherlands)

    Kaluzny, B.L.; Barbici, S.; Berg, G.; Chiomento, R.; Derpanis,D.; Jonsson, U.; Shaw, R.H.A.D.; Smit, M.C.; Ramaroson, F.

    2011-01-01

    This article presents a novel application of known data mining algorithms to the problem of estimating the cost of ship development and construction. The work is a product of North Atlantic Treaty Organization Research and Technology Organization Systems Analysis and Studies 076 Task Group “NATO

  16. Cost Estimation for Cross-organizational ERP Projects: Research Perspectives

    NARCIS (Netherlands)

    Daneva, Maia; Bieman, J.; Wieringa, Roelf J.

    There are many methods for estimating size, effort, schedule and other cost aspects of IS projects, but only one specifically developed for Enterprise Resource Planning (ERP) [67] and none for simultaneous, interdependent ERP projects in a cross-organizational context. The objective of this paper is

  17. Estimating the opportunity costs of bed-days.

    Science.gov (United States)

    Sandmann, Frank G; Robotham, Julie V; Deeny, Sarah R; Edmunds, W John; Jit, Mark

    2018-03-01

    Opportunity costs of bed-days are fundamental to understanding the value of healthcare systems. They greatly influence burden of disease estimations and economic evaluations involving stays in healthcare facilities. However, different estimation techniques employ assumptions that differ crucially in whether to consider the value of the second-best alternative use forgone, of any available alternative use, or the value of the actually chosen alternative. Informed by economic theory, this paper provides a taxonomic framework of methodologies for estimating the opportunity costs of resources. This taxonomy is then applied to bed-days by classifying existing approaches accordingly. We highlight differences in valuation between approaches and the perspective adopted, and we use our framework to appraise the assumptions and biases underlying the standard approaches that have been widely adopted mostly unquestioned in the past, such as the conventional use of reference costs and administrative accounting data. Drawing on these findings, we present a novel approach for estimating the opportunity costs of bed-days in terms of health forgone for the second-best patient, but expressed monetarily. This alternative approach effectively re-connects to the concept of choice and explicitly considers net benefits. It is broadly applicable across settings and for other resources besides bed-days. © 2017 The Authors Health Economics published by John Wiley & Sons Ltd.

  18. Qualitative and quantitative cost estimation : a methodology analysis

    NARCIS (Netherlands)

    Aram, S.; Eastman, C.; Beetz, J.; Issa, R.; Flood, I.

    2014-01-01

    This paper reports on the first part of ongoing research with the goal of designing a framework and a knowledge-based system for 3D parametric model-based quantity take-off and cost estimation in the Architecture, Engineering and Construction (AEC) industry. The authors have studied and analyzed

  19. Estimating the extra cost of living with disability in Vietnam.

    Science.gov (United States)

    Minh, Hoang Van; Giang, Kim Bao; Liem, Nguyen Thanh; Palmer, Michael; Thao, Nguyen Phuong; Duong, Le Bach

    2015-01-01

    Disability is shown to be both a cause and a consequence of poverty. However, relatively little research has investigated the economic cost of living with a disability. This study reports the results of a study on the extra cost of living with disability in Vietnam in 2011. The study was carried out in eight cities/provinces in Vietnam, including Hanoi and Ho Chi Minh cities (two major metropolitan in Vietnam) and six provinces from each of the six socio-economic regions in Vietnam. Costs are estimated using the standard of living approach whereby the difference in incomes between people with disability and those without disability for a given standard of living serves as a proxy for the cost of living with disability. The extra cost of living with disability in Vietnam accounted for about 8.8-9.5% of annual household income, or valued about US$200-218. Communication difficulty was shown to result in highest additional cost of living with disability and self-care difficulty was shown to lead to the lowest levels of extra of living cost. The extra cost of living with disability increased as people had more severe impairment. Interventions to promote the economic security of livelihood for people with disabilities are needed.

  20. Cost Estimating in DoD: Current Status, Trends, and What the Future Holds

    National Research Council Canada - National Science Library

    Nussbaum, Daniel A

    2005-01-01

    (1) Current Status: Baseline analysis of current cost estimating community, including which organizations are responsible for developing and reviewing cost estimates, how many personnel there are, what...

  1. A REVIEW OF ESTIMATION OF SOFTWARE PRODUCTS DEVELOPMENT COSTS

    Directory of Open Access Journals (Sweden)

    Edin Osmanbegović

    2017-01-01

    Full Text Available In the modern business and management of business processes, the standardization of procedures allows the creation of added value, increasing competitiveness and success in the business of an organization. Evaluation of the budget for software development is crucial to the success of an IT project, because the inability to make a realistic assessment leads to inadequate project plans, customer dissatisfaction, poor quality of software products, and reduced profits. In order to minimize such situations, making accurate and reliable software cost estimation should be carried out at all stages of the project life cycle. Although hundreds of research articles focusing on the application of different methods of budget estimates of the software product have been published so far, there is no comprehensive review of the current situation or review of research trends in the budget estimates of the software product. This paper aims to create a framework for estimation of costs of development of software products by providing an overview of the most influential researchers, the most influential articles published in the WoS database, the most used keywords for searching the articles, as well as a review of the estimation techniques used in budget estimates of the software product.

  2. Development of LLW and VLLW disposal business cost estimation system

    International Nuclear Information System (INIS)

    Koibuchi, Hiroko; Ishiguro, Hideharu; Matsuda, Kenji

    2004-01-01

    In order to undertake the LLW and VLLW disposal business, various examinations are carried out in RANDEC. Since it is important in undertaking this business to secure funds, a disposal cost must be calculated by way of trial. However, at present, there are many unknown factors such as the amount of wastes, a disposal schedule, the location of a disposal site, and so on, and the cost cannot be determined. Meanwhile, the cost depends on complicated relations among these factors. Then, a 'LLW and VLLW disposal business cost estimation system' has been developed to calculate the disposal cost easily. This system can calculate an annual balance of payments by using a construction and operation cost of disposal facilities, considering economic parameters of tax, inflation rate, interest rate and so on. And the system can calculate internal reserves to assign to next-stage upkeep of the disposal facilities after the disposal operation. A model of disposal site was designed based on assumption of some preconditions and a study was carried out to make a trial calculation by using the system. Moreover, it will be required to reduce construction cost by rationalizing the facility and to make flat an annual business spending by examining the business schedule. (author)

  3. The distribution and magnitude of emissions mitigation costs in climate stabilization under less than perfect international cooperation: SGM results

    International Nuclear Information System (INIS)

    Calvin, Katherine; Patel, Pralit; Fawcett, Allen; Clarke, Leon; Fisher-Vanden, Karen; Edmonds, Jae; Kim, Son H.; Sands, Ron; Wise, Marshall

    2009-01-01

    The EMF22 Transition Scenario subgroup explores the implications of delayed accession on limiting climate change to various radiative forcing levels. This paper focuses on the cost of limiting radiative forcing and the role that industrial leakage plays in scenarios of delayed accession. We find that delayed participation shifts the cost burden toward regions that take early action and away from regions that undertake mitigation later. However, the inefficiencies introduced by delay are so great that present discounted costs are higher in the delayed scenario for regions that delay as well as for regions taking early actions. An important element of these inefficiencies is industrial emissions leakage, that is non-participating regions increase their emissions relative to the reference case. In aggregate, industrial leakage rates are less than 10% if all regions of the world begin emissions mitigation by 2050-higher in carbon-intensive sectors and lower in low-carbon-intensity sectors. Additionally, we consider the implication of technology on carbon prices, the feasibility of limiting radiative forcing to low levels, and the incentives to overshoot the radiative forcing limit.

  4. Estimation of Damage Costs Associated with Flood Events

    Science.gov (United States)

    Andrews, T. A.; Wauthier, C.; Zipp, K.

    2017-12-01

    This study investigates the possibility of creating a mathematical function that enables the estimation of flood-damage costs. We begin by examining the costs associated with past flood events in the United States. The data on these tropical storms and hurricanes are provided by the National Oceanic and Atmospheric Administration. With the location, extent of flooding, and damage reparation costs identified, we analyze variables such as: number of inches rained, land elevation, type of landscape, region development in regards to building density and infrastructure, and population concentration. We seek to identify the leading drivers of high flood-damage costs and understand which variables play a large role in the costliness of these weather events. Upon completion of our mathematical analysis, we turn out attention to the 2017 natural disaster of Texas. We divide the region, as we did above, by land elevation, type of landscape, region development in regards to building density and infrastructure, and population concentration. Then, we overlay the number of inches rained in those regions onto the divided landscape and apply our function. We hope to use these findings to estimate the potential flood-damage costs of Hurricane Harvey. This information is then transformed into a hazard map that could provide citizens and businesses of flood-stricken zones additional resources for their insurance selection process.

  5. Mrg: A Magnitude Scale for 1 s Rayleigh Waves at Local Distances with Focus on Yield Estimation

    Science.gov (United States)

    2016-08-23

    definition for filtering Rg near 1 s period at distances between 2-100 km. We used the new formula to estimate MRg for 39 small (37 ≤ Y ≤ 12,270 kg TNT...the Butterworth filter order (Russell, 2006). Filter Definition . To estimate the time-domain amplitude of Rg, we filter the time series with a 2nd... phenomenology experiments, including the Arizona Source Phenomenology Experiment (AZ-SPE), Bighorn Active Seismic Experiment (BASE), the HUMMING ALBATROS

  6. Time-driven activity-based costing to estimate cost of care at multidisciplinary aerodigestive centers.

    Science.gov (United States)

    Garcia, Jordan A; Mistry, Bipin; Hardy, Stephen; Fracchia, Mary Shannon; Hersh, Cheryl; Wentland, Carissa; Vadakekalam, Joseph; Kaplan, Robert; Hartnick, Christopher J

    2017-09-01

    Providing high-value healthcare to patients is increasingly becoming an objective for providers including those at multidisciplinary aerodigestive centers. Measuring value has two components: 1) identify relevant health outcomes and 2) determine relevant treatment costs. Via their inherent structure, multidisciplinary care units consolidate care for complex patients. However, their potential impact on decreasing healthcare costs is less clear. The goal of this study was to estimate the potential cost savings of treating patients with laryngeal clefts at multidisciplinary aerodigestive centers. Retrospective chart review. Time-driven activity-based costing was used to estimate the cost of care for patients with laryngeal cleft seen between 2008 and 2013 at the Massachusetts Eye and Ear Infirmary Pediatric Aerodigestive Center. Retrospective chart review was performed to identify clinic utilization by patients as well as patient diet outcomes after treatment. Patients were stratified into neurologically complex and neurologically noncomplex groups. The cost of care for patients requiring surgical intervention was five and three times as expensive of the cost of care for patients not requiring surgery for neurologically noncomplex and complex patients, respectively. Following treatment, 50% and 55% of complex and noncomplex patients returned to normal diet, whereas 83% and 87% of patients experienced improved diets, respectively. Additionally, multidisciplinary team-based care for children with laryngeal clefts potentially achieves 20% to 40% cost savings. These findings demonstrate how time-driven activity-based costing can be used to estimate and compare patient costs in multidisciplinary aerodigestive centers. 2c. Laryngoscope, 127:2152-2158, 2017. © 2017 The American Laryngological, Rhinological and Otological Society, Inc.

  7. Testing and comparison of three frequency-based magnitude estimating parameters for earthquake early warning based events in the Yunnan region, China in 2014

    Science.gov (United States)

    Zhang, Jianjing; Li, Hongjie

    2018-06-01

    To mitigate potential seismic disasters in the Yunnan region, China, building up suitable magnitude estimation scaling laws for an earthquake early warning system (EEWS) is in high demand. In this paper, the records from the main and after-shocks of the Yingjiang earthquake (M W 5.9), the Ludian earthquake (M W 6.2) and the Jinggu earthquake (M W 6.1), which occurred in Yunnan in 2014, were used to develop three estimators, including the maximum of the predominant period ({{τ }{{p}}}\\max ), the characteristic period (τ c) and the log-average period (τ log), for estimating earthquake magnitude. The correlations between these three frequency-based parameters and catalog magnitudes were developed, compared and evaluated against previous studies. The amplitude and period of seismic waves might be amplified in the Ludian mountain-canyon area by multiple reflections and resonance, leading to excessive values of the calculated parameters, which are consistent with Sichuan’s scaling. As a result, τ log was best correlated with magnitude and τ c had the highest slope of regression equation, while {{τ }{{p}}}\\max performed worst with large scatter and less sensitivity for the change of magnitude. No evident saturation occurred in the case of M 6.1 and M 6.2 in this study. Even though both τ c and τ log performed similarly and can well reflect the size of the Earthquake, τ log has slightly fewer prediction errors for small scale earthquakes (M ≤ 4.5), which was also observed by previous research. Our work offers an insight into the feasibility of a EEWS in Yunnan, China, and this study shows that it is necessary to build up an appropriate scaling law suitable for the warning region.

  8. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill.

  9. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill

  10. Uncertainties in Early Stage Capital Cost Estimation of Process Design – A case study on biorefinery design

    Directory of Open Access Journals (Sweden)

    Gurkan eSin

    2015-02-01

    Full Text Available Capital investment, next to the product demand, sales and production costs, is one of the key metrics commonly used for project evaluation and feasibility assessment. Estimating the investment costs of a new product/process alternative during early stage design is a challenging task. This is especially important in biorefinery research, where available information and experiences with new technologies is limited. A systematic methodology for uncertainty analysis of cost data is proposed that employs (a Bootstrapping as a regression method when cost data is available and (b the Monte Carlo technique as an error propagation method based on expert input when cost data is not available. Four well-known models for early stage cost estimation are reviewed an analyzed using the methodology. The significance of uncertainties of cost data for early stage process design is highlighted using the synthesis and design of a biorefinery as a case study. The impact of uncertainties in cost estimation on the identification of optimal processing paths is found to be profound. To tackle this challenge, a comprehensive techno-economic risk analysis framework is presented to enable robust decision making under uncertainties. One of the results using an order-of-magnitude estimate shows that the production of diethyl ether and 1,3-butadiene are the most promising with economic risks of 0.24 MM$/a and 4.6 MM$/a due to uncertainties in cost estimations, respectively.

  11. Cost estimate of Olkiluoto disposal facility for spent nuclear fuel

    International Nuclear Information System (INIS)

    Kukkola, T.; Saanio, T.

    2005-03-01

    The cost estimate covers the underground rock characterisation facility ONKALO, the investment and the operating costs of the above and underground facilities, the decommissioning of the encapsulation plant and the closure costs of the repository. The above ground facility is a once-investment; a re-investment takes place after 37 years operation. The repository is extended stepwise thus also the investment take place in stages. Annual operating costs are calculated with different operating efficiencies. The total investment costs of the disposal facility are estimated to be 503 M euro (Million Euros), the total operating costs are 1,923 M euro and the decommissioning and the closure costs are 116 M euro totaling 2,542 M euro. The investment costs of the above ground facility are 142 M euro, the operating costs are 1,678 M euro. The repository investment costs are 360 M euro and the operating costs are 245 M euro. The decommissioning costs are 7 M euro and the closure costs are 109 M euro. The costs are calculated by using the price level of December 2003. The cost estimate is based on a plan, where the spent fuel is encapsulated and the disposal canisters are disposed into the bedrock at a depth of about 420 meters in one storey. In the encapsulation process, the fuel assemblies are closed into composite canisters, in which the inner part of the canister is made of nodular cast iron and the outer wall of copper having a thickness of 50 mm. The inner canister is closed gas-tight by a bolted steel lid, and the electron beam welding method is used to close the outer copper lid. The encapsulation plant is independent and located above the deep repository spaces. The disposal canisters are transported to the repository by the lift. The disposal tunnels are constructed and closed in stages according the disposal canisters disposal. The operating time of the Loviisa nuclear power plant units is assumed to be 50 years and the operating time of the Olkiluoto nuclear power

  12. Estimating boiling water reactor decommissioning costs. A user's manual for the BWR Cost Estimating Computer Program (CECP) software: Draft report for comment

    International Nuclear Information System (INIS)

    Bierschbach, M.C.

    1994-12-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the U.S. Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning BWR power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

  13. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  14. Methodology for estimating reprocessing costs for nuclear fuels

    International Nuclear Information System (INIS)

    Carter, W.L.; Rainey, R.H.

    1980-02-01

    A technological and economic evaluation of reprocessing requirements for alternate fuel cycles requires a common assessment method and a common basis to which various cycles can be related. A methodology is described for the assessment of alternate fuel cycles utilizing a side-by-side comparison of functional flow diagrams of major areas of the reprocessing plant with corresponding diagrams of the well-developed Purex process as installed in the Barnwell Nuclear Fuel Plant (BNFP). The BNFP treats 1500 metric tons of uranium per year (MTU/yr). Complexity and capacity factors are determined for adjusting the estimated facility and equipment costs of BNFP to determine the corresponding costs for the alternate fuel cycle. Costs of capacities other than the reference 1500 MT of heavy metal per year are estimated by the use of scaling factors. Unit costs of reprocessed fuel are calculated using a discounted cash flow analysis for three economic bases to show the effect of low-risk, typical, and high-risk financing methods

  15. Estimated incident cost savings in shipping due to inspections.

    Science.gov (United States)

    Knapp, Sabine; Bijwaard, Govert; Heij, Christiaan

    2011-07-01

    The effectiveness of safety inspections of ships has been analysed from various angles, but until now, relatively little attention has been given to translate risk reduction into incident cost savings. This paper provides a monetary quantification of the cost savings that can be attributed to port state control inspections and industry vetting inspections. The dataset consists of more than half a million ship arrivals between 2002 and 2007 and contains inspections of port state authorities in the USA and Australia and of three industry vetting regimes. The effect of inspections in reducing the risk of total loss accidents is estimated by means of duration models, in terms of the gained probability of survival. The monetary benefit of port state control inspections is estimated to range, on average, from about 70 to 190 thousand dollars, with median values ranging from about 20 to 45 thousand dollars. Industry inspections have even higher benefits, especially for tankers. The savings are in general higher for older and larger vessels, and also for vessels with undefined flag and unknown classification society. As inspection costs are relatively low in comparison to potential cost savings, the results underline the importance of determining ships with relatively high risk of total loss. Copyright © 2011 Elsevier Ltd. All rights reserved.

  16. 48 CFR 1852.216-74 - Estimated cost and fixed fee.

    Science.gov (United States)

    2010-10-01

    ... and Clauses 1852.216-74 Estimated cost and fixed fee. As prescribed in 1816.307-70(b), insert the following clause: Estimated Cost and Fixed Fee (DEC 1991) The estimated cost of this contract is ______ exclusive of the fixed fee of ______. The total estimated cost and fixed fee is ______. (End of clause) [62...

  17. How Choice of Depth Horizon Influences the Estimated Spatial Patterns and Global Magnitude of Ocean Carbon Export Flux

    Science.gov (United States)

    Palevsky, Hilary I.; Doney, Scott C.

    2018-05-01

    Estimated rates and efficiency of ocean carbon export flux are sensitive to differences in the depth horizons used to define export, which often vary across methodological approaches. We evaluate sinking particulate organic carbon (POC) flux rates and efficiency (e-ratios) in a global earth system model, using a range of commonly used depth horizons: the seasonal mixed layer depth, the particle compensation depth, the base of the euphotic zone, a fixed depth horizon of 100 m, and the maximum annual mixed layer depth. Within this single dynamically consistent model framework, global POC flux rates vary by 30% and global e-ratios by 21% across different depth horizon choices. Zonal variability in POC flux and e-ratio also depends on the export depth horizon due to pronounced influence of deep winter mixing in subpolar regions. Efforts to reconcile conflicting estimates of export need to account for these systematic discrepancies created by differing depth horizon choices.

  18. The Single Cigarette Economy in India--a Back of the Envelope Survey to Estimate its Magnitude.

    Science.gov (United States)

    Lal, Pranay; Kumar, Ravinder; Ray, Shreelekha; Sharma, Narinder; Bhattarcharya, Bhaktimay; Mishra, Deepak; Sinha, Mukesh K; Christian, Anant; Rathinam, Arul; Singh, Gurbinder

    2015-01-01

    Sale of single cigarettes is an important factor for early experimentation, initiation and persistence of tobacco use and a vital factor in the smoking epidemic in India as it is globally. Single cigarettes also promote the sale of illicit cigarettes and neutralises the effect of pack warnings and effective taxation, making tobacco more accessible and affordable to minors. This is the first study to our knowledge which estimates the size of the single stick market in India. In February 2014, a 10 jurisdiction survey was conducted across India to estimate the sale of cigarettes in packs and sticks, by brands and price over a full business day. We estimate that nearly 75% of all cigarettes are sold as single sticks annually, which translates to nearly half a billion US dollars or 30 percent of the India's excise revenues from all cigarettes. This is the price which the consumers pay but is not captured through tax and therefore pervades into an informal economy. Tracking the retail price of single cigarettes is an efficient way to determine the willingness to pay by cigarette smokers and is a possible method to determine the tax rates in the absence of any other rationale.

  19. Estimated costs of treatment of benign prostate hyperplasia in Brazil

    Directory of Open Access Journals (Sweden)

    Haylton J. Suaid

    2003-06-01

    Full Text Available INTRODUCTION: The treatment of benign prostate hyperplasia (BPH presents 2 options: medical or surgical, and there are doubts about what is the best treatment since 80% of patients who undergo surgery become asymptomatic and 10 to 40% of those under medical regimen undergo surgery within a 5 years period. It is difficult to assess the actual costs of treating BPH in Brazil due to several factors, among them regional particularities and the scarcity of current statistical data. PATIENTS AND METHODS: Recently, in the Ribeirão Preto area, São Paulo, Brazil, the IPSS (International Prostatic Symptoms Score and quality of life were verified in 934 volunteers. It was determined the percentage of individuals with ages ranging from 40 to 79 years with moderate symptoms (score 8-19 and with severe symptoms (score 20-35, values for which are indicated medical and surgical treatment, respectively, according to the Brazilian Society of Urology consensus on BPH. Data on Brazilian population in that age range were obtained from the Brazilian Institute of Geography and Statistics referent to the year of 2000. It was determined the number of patients, according to the criteria above, subjected to either one of the treatments mentioned. Surgical costs of prostate transurethral resection were researched according to Unified Health System - SUS tables (US$ 173 and of Brazilian Medical Society - AMB with a mean cost in 3 hospitals of US$ 933. Drug costs were calculated by the annual mean price (US$ 355 of 4 alpha-blockers (tamsulosin, alfuzosin, doxazosin and terazosin. RESULTS: The estimated population for medical treatment was 5,397,321 individuals, with a cost corresponding to US$ 1,916,489,055.00. The estimated population for surgical treatment was 2,040,299 men, what would represent a cost of US$ 353,291,204.00 based on the SUS table and of US$ 1,904,279,066.00 based on AMB with hospital expenses included. CONCLUSION: All theses facts induce us to predict

  20. Estimating the cost of blood: past, present, and future directions.

    Science.gov (United States)

    Shander, Aryeh; Hofmann, Axel; Gombotz, Hans; Theusinger, Oliver M; Spahn, Donat R

    2007-06-01

    Understanding the costs associated with blood products requires sophisticated knowledge about transfusion medicine and is attracting the attention of clinical and administrative healthcare sectors worldwide. To improve outcomes, blood usage must be optimized and expenditures controlled so that resources may be channeled toward other diagnostic, therapeutic, and technological initiatives. Estimating blood costs, however, is a complex undertaking, surpassing simple supply versus demand economics. Shrinking donor availability and application of a precautionary principle to minimize transfusion risks are factors that continue to drive the cost of blood products upward. Recognizing that historical accounting attempts to determine blood costs have varied in scope, perspective, and methodology, new approaches have been initiated to identify all potential cost elements related to blood and blood product administration. Activities are also under way to tie these elements together in a comprehensive and practical model that will be applicable to all single-donor blood products without regard to practice type (e.g., academic, private, multi- or single-center clinic). These initiatives, their rationale, importance, and future directions are described.

  1. Examination of the site amplification factor of OBS and their application to magnitude estimation and ground-motion prediction for EEW

    Science.gov (United States)

    Hayashimoto, N.; Hoshiba, M.

    2013-12-01

    1. Introduction Ocean bottom seismograph (OBS) is useful for making Earthquake Early Warning (EEW) earlier. However, careful handling of these data is required because the installation environment of OBSs may be different from that of land stations. Site amplification factor is an important factor to estimate the magnitudes, and to predict ground motions (e.g. seismic intensity) in EEW. In this presentation, we discuss the site amplification factor of OBS in the Tonankai area of Japan from these two points of view. 2. Examination of magnitude correction of OBS In the EEW of JMA, the magnitude is estimated from the maximum amplitude of the displacement in real time. To provide the fast magnitude estimation, the magnitude-estimation algorithm switches from the P to S formula (Meew(P) to Meew(S)) depending on the expected S-phase arrival (Kamigaichi,2004). To estimate the magnitude correction for OBS, we determine Meew(P) and Meew(S) at OBSs and compare them with JMA magnitude (Mjma). We find Meew(S) at OBS is generally larger than Mjma by approximately 0.6. The slight differences of spatial distribution of Meew(S) amplification are also found among other OBSs. From the numerical simulations, Nakamura et al. (MGR,submitted) pointed out that the oceanic layer and the low-velocity sediment layers causes the large amplifications in low frequency range (0.1-0.2Hz) at OBSs. We conclude that the site effect of OBS characterized by such a low velocity sediment layers causes those amplification of Magnitude. 3. The frequency-dependent site factor of OBS estimated from Fourier spectrum ratio and their application for prediction of seismic intensity of land station We compare Fourier spectra of S-wave portion on OBSs with those on adjacent land stations. Station pair whose distance is smaller than 50 km is analyzed, and we obtain that spectral ratio of land station (MIEH05 of the KiK-net/NIED) to OBS (KMA01 of the DONET/JAMSTEC) is 5-20 for frequencies 10-20Hz for both

  2. Estimating the magnitude of morphoscapes: how to measure the morphological component of biodiversity in relation to habitats using geometric morphometrics

    Science.gov (United States)

    Fontaneto, Diego; Panisi, Martina; Mandrioli, Mauro; Montardi, Dario; Pavesi, Maurizio; Cardini, Andrea

    2017-08-01

    Ecological indicators are currently developed to account for the different facets of loss of biological diversity due to direct or indirect effects of human activities. Most ecological indicators include species richness as a metric. Others, such as functional traits and phylogenetic diversity, account for differences in species, even when species richness is the same. Here, we describe and apply a different indicator, called morphoscape dimension, accounting for morphological variability across habitats in a geographical region. We use the case of ground beetles (Coleoptera: Carabidae) in four different habitats in the Po Plain in Northern Italy to exemplify how to quantify the magnitude of the morphological space (i.e. the dimension of the morphoscape) occupied by the species in each habitat using geometric morphometrics. To this aim, we employed a variety of metrics of morphological disparity related to univariate size, and more complex multivariate shape and form. Our `proof of concept' suggests that metrics assessing size and form might largely tend to simply mirror the information provided by species richness, whereas shape morphoscape disparity may be able to account for non-trivial differences in species traits amongst habitats. This is indicated by the woodland morphoscape being on average bigger than that of crops, the most species-rich habitat, despite having almost 20% less species. We conclude suggesting that the analysis of morphoscape dimension has the potential to become a new additional and complimentary tool in the hands of conservation biologists and ecologists to explore and quantify habitat complexity and inform decisions on management and conservation based on a wide set of ecological indicators.

  3. COSTMODL - AN AUTOMATED SOFTWARE DEVELOPMENT COST ESTIMATION TOOL

    Science.gov (United States)

    Roush, G. B.

    1994-01-01

    The cost of developing computer software consumes an increasing portion of many organizations' budgets. As this trend continues, the capability to estimate the effort and schedule required to develop a candidate software product becomes increasingly important. COSTMODL is an automated software development estimation tool which fulfills this need. Assimilating COSTMODL to any organization's particular environment can yield significant reduction in the risk of cost overruns and failed projects. This user-customization capability is unmatched by any other available estimation tool. COSTMODL accepts a description of a software product to be developed and computes estimates of the effort required to produce it, the calendar schedule required, and the distribution of effort and staffing as a function of the defined set of development life-cycle phases. This is accomplished by the five cost estimation algorithms incorporated into COSTMODL: the NASA-developed KISS model; the Basic, Intermediate, and Ada COCOMO models; and the Incremental Development model. This choice affords the user the ability to handle project complexities ranging from small, relatively simple projects to very large projects. Unique to COSTMODL is the ability to redefine the life-cycle phases of development and the capability to display a graphic representation of the optimum organizational structure required to develop the subject project, along with required staffing levels and skills. The program is menu-driven and mouse sensitive with an extensive context-sensitive help system that makes it possible for a new user to easily install and operate the program and to learn the fundamentals of cost estimation without having prior training or separate documentation. The implementation of these functions, along with the customization feature, into one program makes COSTMODL unique within the industry. COSTMODL was written for IBM PC compatibles, and it requires Turbo Pascal 5.0 or later and Turbo

  4. The Magnitude of Mortality from Ischemic Heart Disease Attributed to Occupational Factors in Korea - Attributable Fraction Estimation Using Meta-analysis.

    Science.gov (United States)

    Ha, Jaehyeok; Kim, Soo-Geun; Paek, Domyung; Park, Jungsun

    2011-03-01

    Ischemic heart disease (IHD) is a major cause of death in Korea and known to result from several occupational factors. This study attempted to estimate the current magnitude of IHD mortality due to occupational factors in Korea. After selecting occupational risk factors by literature investigation, we calculated attributable fractions (AFs) from relative risks and exposure data for each factor. Relative risks were estimated using meta-analysis based on published research. Exposure data were collected from the 2006 Survey of Korean Working Conditions. Finally, we estimated 2006 occupation-related IHD mortality. FOR THE FACTORS CONSIDERED, WE ESTIMATED THE FOLLOWING RELATIVE RISKS: noise 1.06, environmental tobacco smoke 1.19 (men) and 1.22 (women), shift work 1.12, and low job control 1.15 (men) and 1.08 (women). Combined AFs of those factors in the IHD were estimated at 9.29% (0.3-18.51%) in men and 5.78% (-7.05-19.15%) in women. Based on these fractions, Korea's 2006 death toll from occupational IHD between the age of 15 and 69 was calculated at 353 in men (total 3,804) and 72 in women (total 1,246). We estimated occupational IHD mortality of Korea with updated data and more relevant evidence. Despite the efforts to obtain reliable estimates, there were many assumptions and limitations that must be overcome. Future research based on more precise design and reliable evidence is required for more accurate estimates.

  5. Estimation of costs for applications of remediation technologies for the Department of Energy's Programmatic Environmental Impact Statement

    International Nuclear Information System (INIS)

    Villegas, A.J.; Hansen, R.I.; Humphreys, K.K.; Paananen, J.M.; Gildea, L.F.

    1994-01-01

    The Programmatic Environmental impact Statement (PEIS) being developed by the US Department of Energy (DOE) for environmental restoration (ER) and waste management (WM) activities expected to be carried out across the DOE's nationwide complex of facilities is assessing the impacts of removing, transporting, treating, storing, and disposing of waste from these ER and WM activities. Factors being considered include health and safety impacts to the public and to workers, impacts on the environment, costs and socio-economic impacts, and near-term and residual risk during those ER and WM operations. The purpose of this paper is to discuss the methodology developed specifically for the PEIS to estimate costs associated with the deployment and application of individual remediation technologies. These individual costs are used in developing order-of-magnitude cost estimates for the total remediation activities. Costs are developed on a per-unit-of-material-to-be-treated basis (i.e., $/m 3 ) to accommodate remediation projects of varying sizes. The primary focus of this cost-estimating effort was the development of capital and operating unit cost factors based on the amount of primary media to be removed, handled, and treated. The unit costs for individual treatment technologies were developed using information from a variety of sources, mainly from periodicals, EPA documentation, handbooks, vendor contacts, and cost models. The unit cost factors for individual technologies were adjusted to 1991 dollars

  6. Introduction to the methods of estimating nuclear power generating costs

    Energy Technology Data Exchange (ETDEWEB)

    1961-11-01

    The present report prepared by the Agency with the guidance and assistance of a panel of experts from Member States, the names of whom will be found at the end of this report, represents the first step in the methods of cost evaluation. The main objectives of the report are: (1) The preparation of a full list of the cost items likely to be encountered so that the preliminary estimates for a given nuclear power system can be relied upon in deciding on its economic merits. (2) A survey of the methods currently used for the estimation of the generating costs of the power produced by a nuclear station. The survey is intended for a wide audience ranging from engineers to public officials with an interest in the prospects of nuclear power. An attempt has therefore been made to refrain from detailed technical discussions in order to make the presentation easily understandable to readers with only a very general knowledge of the principles of nuclear engineering. 3 figs, tabs.

  7. Estimation of cost function in the natural gas industry

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Duk [Korea Energy Economics Institute, Euiwang (Korea)

    1999-02-01

    The natural gas industry in Korea has characteristics of a dual industrial structure with wholesale and retail and a regional monopoly of city gas company. Recently there have been discussions on the restructuring of gas industry and the problems arising from such industrial organization. At this point, the labor and capital cost of KOGAS were analyzed to find out efficiency of KOGAS, the wholesaler and the cost function focusing on distribution was estimated to find out effect of scale of city gas company, the retailer. As a result, in the case of KOGAS, it is prove that enhancing competitive power is needed by improving labor productivity through stabilization of labor structure and by maximizing value-added through stability of capital combination. From the estimation of cost function of city gas companies, the existing regional monopoly of city gas company have effects on its scale only when the area of operation and end users used the same amount per end user are increased. (author). 31 refs., 10 figs., 43 tabs.

  8. Introduction to the methods of estimating nuclear power generating costs

    International Nuclear Information System (INIS)

    1961-01-01

    The present report prepared by the Agency with the guidance and assistance of a panel of experts from Member States, the names of whom will be found at the end of this report, represents the first step in the methods of cost evaluation. The main objectives of the report are: (1) The preparation of a full list of the cost items likely to be encountered so that the preliminary estimates for a given nuclear power system can be relied upon in deciding on its economic merits. (2) A survey of the methods currently used for the estimation of the generating costs of the power produced by a nuclear station. The survey is intended for a wide audience ranging from engineers to public officials with an interest in the prospects of nuclear power. An attempt has therefore been made to refrain from detailed technical discussions in order to make the presentation easily understandable to readers with only a very general knowledge of the principles of nuclear engineering. 3 figs, tabs

  9. The model for estimation production cost of embroidery handicraft

    Science.gov (United States)

    Nofierni; Sriwana, IK; Septriani, Y.

    2017-12-01

    Embroidery industry is one of type of micro industry that produce embroidery handicraft. These industries are emerging in some rural areas of Indonesia. Embroidery clothing are produce such as scarves and clothes that show cultural value of certain region. The owner of an enterprise must calculate the cost of production before making a decision on how many products are received from the customer. A calculation approach to production cost analysis is needed to consider the feasibility of each order coming. This study is proposed to design the expert system (ES) in order to improve production management in the embroidery industry. The model will design used Fuzzy inference system as a model to estimate production cost. Research conducted based on survey and knowledge acquisitions from stakeholder of supply chain embroidery handicraft industry at Bukittinggi, West Sumatera, Indonesia. This paper will use fuzzy input where the quality, the complexity of the design and the working hours required and the result of the model are useful to manage production cost on embroidery production.

  10. Estimating generation costs for wind power production in France

    International Nuclear Information System (INIS)

    Benazet, J.F.; Probert, E.J.

    1997-01-01

    Wind power is being exploited in several European countries as one of a possible number of sources of renewable energy. However, in France there is a heavy reliance on nuclear and hydro-electric power and the potential of wind power as part of the energy mix has been virtually ignored. One of the reasons advanced for the under utilisation of this technology is that it is financially unattractive. In this paper the contribution which wind power could potentially make to overall power production levels in France is examined. A cost estimate model is developed which derives electricity generation costs and determines realistic levels of production for the future. The model automatically determines the associated number of wind turbines required and the geographical areas in which they should be located. (author)

  11. Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

    Science.gov (United States)

    Butts, Glenn

    2007-01-01

    Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

  12. IVF cycle cost estimation using Activity Based Costing and Monte Carlo simulation.

    Science.gov (United States)

    Cassettari, Lucia; Mosca, Marco; Mosca, Roberto; Rolando, Fabio; Costa, Mauro; Pisaturo, Valerio

    2016-03-01

    The Authors present a new methodological approach in stochastic regime to determine the actual costs of an healthcare process. The paper specifically shows the application of the methodology for the determination of the cost of an Assisted reproductive technology (ART) treatment in Italy. The reason of this research comes from the fact that deterministic regime is inadequate to implement an accurate estimate of the cost of this particular treatment. In fact the durations of the different activities involved are unfixed and described by means of frequency distributions. Hence the need to determine in addition to the mean value of the cost, the interval within which it is intended to vary with a known confidence level. Consequently the cost obtained for each type of cycle investigated (in vitro fertilization and embryo transfer with or without intracytoplasmic sperm injection), shows tolerance intervals around the mean value sufficiently restricted as to make the data obtained statistically robust and therefore usable also as reference for any benchmark with other Countries. It should be noted that under a methodological point of view the approach was rigorous. In fact it was used both the technique of Activity Based Costing for determining the cost of individual activities of the process both the Monte Carlo simulation, with control of experimental error, for the construction of the tolerance intervals on the final result.

  13. Treatment Cost Analysis Tool (TCAT) for estimating costs of outpatient treatment services.

    Science.gov (United States)

    Flynn, Patrick M; Broome, Kirk M; Beaston-Blaakman, Aaron; Knight, Danica K; Horgan, Constance M; Shepard, Donald S

    2009-02-01

    A Microsoft Excel-based workbook designed for research analysts to use in a national study was retooled for treatment program directors and financial officers to allocate, analyze, and estimate outpatient treatment costs in the U.S. This instrument can also be used as a planning and management tool to optimize resources and forecast the impact of future changes in staffing, client flow, program design, and other resources. The Treatment Cost Analysis Tool (TCAT) automatically provides feedback and generates summaries and charts using comparative data from a national sample of non-methadone outpatient providers. TCAT is being used by program staff to capture and allocate both economic and accounting costs, and outpatient service costs are reported for a sample of 70 programs. Costs for an episode of treatment in regular, intensive, and mixed types of outpatient treatment were $882, $1310, and $1381 respectively (based on 20% trimmed means and 2006 dollars). An hour of counseling cost $64 in regular, $85 intensive, and $86 mixed. Group counseling hourly costs per client were $8, $11, and $10 respectively for regular, intensive, and mixed. Future directions include use of a web-based interview version, much like some of the commercially available tax preparation software tools, and extensions for use in other modalities of treatment.

  14. Hydraulic Geometry, GIS and Remote Sensing, Techniques against Rainfall-Runoff Models for Estimating Flood Magnitude in Ephemeral Fluvial Systems

    Directory of Open Access Journals (Sweden)

    Rafael Garcia-Lorenzo

    2010-11-01

    Full Text Available This paper shows the combined use of remotely sensed data and hydraulic geometry methods as an alternative to rainfall-runoff models. Hydraulic geometric data and boolean images of water sheets obtained from satellite images after storm events were integrated in a Geographical Information System. Channel cross-sections were extracted from a high resolution Digital Terrain Model (DTM and superimposed on the image cover to estimate the peak flow using HEC-RAS. The proposed methodology has been tested in ephemeral channels (ramblas on the coastal zone in south-eastern Spain. These fluvial systems constitute an important natural hazard due to their high discharges and sediment loads. In particular, different areas affected by floods during the period 1997 to 2009 were delimited through HEC-GeoRAs from hydraulic geometry data and Landsat images of these floods (Landsat‑TM5 and Landsat-ETM+7. Such an approach has been validated against rainfall-surface runoff models (SCS Dimensionless Unit Hydrograph, SCSD, Témez gamma HU Tγ and the Modified Rational method, MRM comparing their results with flood hydrographs of the Automatic Hydrologic Information System (AHIS in several ephemeral channels in the Murcia Region. The results obtained from the method providing a better fit were used to calculate different hydraulic geometry parameters, especially in residual flood areas.

  15. Uncertainties in Early-Stage Capital Cost Estimation of Process Design – A Case Study on Biorefinery Design

    International Nuclear Information System (INIS)

    Cheali, Peam; Gernaey, Krist V.; Sin, Gürkan

    2015-01-01

    Capital investment, next to the product demand, sales, and production costs, is one of the key metrics commonly used for project evaluation and feasibility assessment. Estimating the investment costs of a new product/process alternative during early-stage design is a challenging task, which is especially relevant in biorefinery research where information about new technologies and experience with new technologies is limited. A systematic methodology for uncertainty analysis of cost data is proposed that employs: (a) bootstrapping as a regression method when cost data are available; and, (b) the Monte Carlo technique as an error propagation method based on expert input when cost data are not available. Four well-known models for early-stage cost estimation are reviewed and analyzed using the methodology. The significance of uncertainties of cost data for early-stage process design is highlighted using the synthesis and design of a biorefinery as a case study. The impact of uncertainties in cost estimation on the identification of optimal processing paths is indeed found to be profound. To tackle this challenge, a comprehensive techno-economic risk analysis framework is presented to enable robust decision-making under uncertainties. One of the results using order-of-magnitude estimates shows that the production of diethyl ether and 1,3-butadiene are the most promising with the lowest economic risks (among the alternatives considered) of 0.24 MM$/a and 4.6 MM$/a, respectively.

  16. Uncertainties in Early-Stage Capital Cost Estimation of Process Design – A Case Study on Biorefinery Design

    Energy Technology Data Exchange (ETDEWEB)

    Cheali, Peam; Gernaey, Krist V.; Sin, Gürkan, E-mail: gsi@kt.dtu.dk [Department of Chemical and Biochemical Engineering, Technical University of Denmark, Lyngby (Denmark)

    2015-02-06

    Capital investment, next to the product demand, sales, and production costs, is one of the key metrics commonly used for project evaluation and feasibility assessment. Estimating the investment costs of a new product/process alternative during early-stage design is a challenging task, which is especially relevant in biorefinery research where information about new technologies and experience with new technologies is limited. A systematic methodology for uncertainty analysis of cost data is proposed that employs: (a) bootstrapping as a regression method when cost data are available; and, (b) the Monte Carlo technique as an error propagation method based on expert input when cost data are not available. Four well-known models for early-stage cost estimation are reviewed and analyzed using the methodology. The significance of uncertainties of cost data for early-stage process design is highlighted using the synthesis and design of a biorefinery as a case study. The impact of uncertainties in cost estimation on the identification of optimal processing paths is indeed found to be profound. To tackle this challenge, a comprehensive techno-economic risk analysis framework is presented to enable robust decision-making under uncertainties. One of the results using order-of-magnitude estimates shows that the production of diethyl ether and 1,3-butadiene are the most promising with the lowest economic risks (among the alternatives considered) of 0.24 MM$/a and 4.6 MM$/a, respectively.

  17. Estimation of cellular manufacturing cost components using simulation and activity-based costing

    OpenAIRE

    Paul Savory; Robert Williams

    2010-01-01

    It can be difficult estimating all of the cost components that are attributed to a machined part.  This problem is more pronounced when a factory uses group technology manufacturing cells as opposed to a functional or process layout of a job shop.  This paper describes how activity-based costing (ABC) concepts can be integrated into a discrete-event simulation model of a U-shaped manufacturing cell producing a part family with four members.  The simulation model generates detai...

  18. Estimation of cellular manufacturing cost components using simulation and activity-based costing

    OpenAIRE

    Savory, Paul

    2010-01-01

    It can be difficult estimating all of the cost components that are attributed to a machined part. This problem is more pronounced when a factory uses group technology manufacturing cells as opposed to a functional or process layout of a job shop. This paper describes how activity-based costing (ABC) concepts can be integrated into a discrete-event simulation model of a U-shaped manufacturing cell producing a part family with four members. The simulation model generates detailed Bills of Ac...

  19. 48 CFR 2452.216-70 - Estimated cost, base fee and award fee.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost, base fee... Provisions and Clauses 2452.216-70 Estimated cost, base fee and award fee. As prescribed in 2416.406(e)(1), insert the following clause in all cost-plus-award-fee contracts: Estimated Cost, Base Fee and Award Fee...

  20. 48 CFR 1852.216-85 - Estimated cost and award fee.

    Science.gov (United States)

    2010-10-01

    ... and Clauses 1852.216-85 Estimated cost and award fee. As prescribed in 1816.406-70(e), insert the following clause: Estimated Cost and Award Fee (SEP 1993) The estimated cost of this contract is $___. The... cost, base fee, and maximum award fee are $___. (End of clause) Alternate I (SEP 1993). As prescribed...

  1. Development of a Cost Estimation Process for Human Systems Integration Practitioners During the Analysis of Alternatives

    Science.gov (United States)

    2010-12-01

    processes. Novice estimators must often use of these complicated cost estimation tools (e.g., ACEIT , SEER-H, SEER-S, PRICE-H, PRICE-S, etc.) until...However, the thesis will leverage the processes embedded in cost estimation tools such as the Automated Cost Estimating Integration Tool ( ACEIT ) and the

  2. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  3. Advanced fuel cycle cost estimation model and its cost estimation results for three nuclear fuel cycles using a dynamic model in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sungki, E-mail: sgkim1@kaeri.re.kr [Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353 (Korea, Republic of); Ko, Wonil [Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353 (Korea, Republic of); Youn, Saerom; Gao, Ruxing [University of Science and Technology, 217 Gajungro, Yuseong-gu, Daejeon 305-350 (Korea, Republic of); Bang, Sungsig, E-mail: ssbang@kaist.ac.kr [Korea Advanced Institute of Science and Technology, Department of Business and Technology Management, 291 Deahak-ro, Yuseong-gu, Daejeon 305-701 (Korea, Republic of)

    2015-11-15

    Highlights: • The nuclear fuel cycle cost using a new cost estimation model was analyzed. • The material flows of three nuclear fuel cycle options were calculated. • The generation cost of once-through was estimated to be 66.88 mills/kW h. • The generation cost of pyro-SFR recycling was estimated to be 78.06 mills/kW h. • The reactor cost was identified as the main cost driver of pyro-SFR recycling. - Abstract: The present study analyzes advanced nuclear fuel cycle cost estimation models such as the different discount rate model and its cost estimation results. To do so, an analysis of the nuclear fuel cycle cost of three options (direct disposal (once through), PWR–MOX (Mixed OXide fuel), and Pyro-SFR (Sodium-cooled Fast Reactor)) from the viewpoint of economic sense, focusing on the cost estimation model, was conducted using a dynamic model. From an analysis of the fuel cycle cost estimation results, it was found that some cost gap exists between the traditional same discount rate model and the advanced different discount rate model. However, this gap does not change the priority of the nuclear fuel cycle option from the viewpoint of economics. In addition, the fuel cycle costs of OT (Once-Through) and Pyro-SFR recycling based on the most likely value using a probabilistic cost estimation except for reactor costs were calculated to be 8.75 mills/kW h and 8.30 mills/kW h, respectively. Namely, the Pyro-SFR recycling option was more economical than the direct disposal option. However, if the reactor cost is considered, the economic sense in the generation cost between the two options (direct disposal vs. Pyro-SFR recycling) can be changed because of the high reactor cost of an SFR.

  4. Development of simplified decommissioning cost estimation code for nuclear facilities

    International Nuclear Information System (INIS)

    Tachibana, Mitsuo; Shiraishi, Kunio; Ishigami, Tsutomu

    2010-01-01

    The simplified decommissioning cost estimation code for nuclear facilities (DECOST code) was developed in consideration of features and structures of nuclear facilities and similarity of dismantling methods. The DECOST code could calculate 8 evaluation items of decommissioning cost. Actual dismantling in the Japan Atomic Energy Agency (JAEA) was evaluated; unit conversion factors used to calculate the manpower of dismantling activities were evaluated. Consequently, unit conversion factors of general components could be classified into three kinds. Weights of components and structures of the facility were necessary for calculation of manpower. Methods for evaluating weights of components and structures of the facility were studied. Consequently, the weight of components in the facility was proportional to the weight of structures of the facility. The weight of structures of the facility was proportional to the total area of floors in the facility. Decommissioning costs of 7 nuclear facilities in the JAEA were calculated by using the DECOST code. To verify the calculated results, the calculated manpower was compared with the manpower gained from actual dismantling. Consequently, the calculated manpower and actual manpower were almost equal. The outline of the DECOST code, evaluation results of unit conversion factors, the evaluation method of the weights of components and structures of the facility are described in this report. (author)

  5. Cost estimation of sumatra electricity expansion planning with nuclear option

    International Nuclear Information System (INIS)

    Edwaren Liun

    2008-01-01

    The objective of the study is to obtain the cost analysis on optimum solution of Sumatra electricity system using WASP-IV Program. Considering the economic aspect, nuclear power plant (NPP) is feasible in the future. From the geographical aspect Sumatra is prospecting for NPP site, especially the east coastal area due to the absence of hydro power potential and geothermal field. The use of petroleum as fuel in large scale power plants is not feasible. Beside causing high cost for electricity sector, it is also an important fuel for any other sectors such as transportation, electrification of isolated areas. Gas fuelled power plants is still feasible for next several decades in limited capacity. The study presents three scenarios, i.e. Low Scenario, Base Scenario and High Scenario applying discount rate of 8%, 10% and 12% respectively. Cost estimation for Sumatra System Expansion Planning is 57 465 million US$ on the Base Scenario - discount rate 8%, 59 349 million US$ on the Base Scenario - discount rate 10%, and 57 796 million US$ on the Base Scenario - discount rate 12%. The objective function is 15 172 US$ on the Base Scenario - discount rate 8%, 12 663 million US$ on the Base Scenario - discount rate 10%, and 11 017 million US$ on the Base Scenario - discount rate 12%. (author)

  6. Cost estimation for slope stability improvement in Muara Enim

    Science.gov (United States)

    Juliantina, Ika; Sutejo, Yulindasari; Adhitya, Bimo Brata; Sari, Nurul Permata; Kurniawan, Reffanda

    2017-11-01

    Case study area of SP. Sugihwaras-Baturaja is typologically specified in the C-zone type because the area is included in the foot of the mountain with a slope of 0 % to 20 %. Generally, the factors that cause landslide in Muara Enim Regency due to the influence of soil/rock, water factor, geological factors, and human activities. Slope improvement on KM.273 + 642-KM.273 + 774 along 132 m using soil nailing with 19 mm diameter tendon iron and an angle of 20o and a 75 mm shotcrete thickness, a K-250 concrete grouting material. Cost modeling (y) soil nailing based on 4 variables are X1 = length, X2 = horizontal distance, X3 = safety factor (SF), and X4 = time. Nine variations were used as multiple linear regression equations and analyzed with SPSS.16.0 program. Based on the SPSS output, then attempt the classical assumption and feasibility test model which produced the model that is Cost = (1,512,062 + 194,354 length-1,649,135 distance + 187,831 SF + 54,864 time) million Rupiah. The budget plan includes preparatory work, drainage system, soil nailing, and shotcrete. An efficient cost estimate of 8 m length nail, 1.5 m installation distance, safety factor (SF) = 1.742 and a 30 day processing time resulted in a fee of Rp. 2,566,313,000.00 (Two billion five hundred sixty six million three hundred thirteen thousand rupiah).

  7. Improving techniques to estimate the magnitude and frequency of floods on urban streams in South Carolina, North Carolina, and Georgia, 2011 (ver. 1.1, March 2014) : U.S. Geological Survey scientific investigations report 2014-5030.

    Science.gov (United States)

    2014-03-01

    Reliable estimates of the magnitude and frequency : of floods are essential for the design of transportation and : water-conveyance structures, flood-insurance studies, and : flood-plain management. Such estimates are particularly : important in dens...

  8. A General Model for Cost Estimation in an Exchange

    Directory of Open Access Journals (Sweden)

    Benzion Barlev

    2014-03-01

    Full Text Available Current Generally Accepted Accounting Principles (GAAP state that the cost of an asset acquired for cash is the fair value (FV of the amount surrendered, and that of an asset acquired in a non-monetary exchange is the FV of the asset surrendered or, if it is more “clearly evident,” the FV of the acquired asset. The measurement method prescribed for a non-monetary exchange ignores valuable information about the “less clearly evident” asset. Thus, we suggest that the FV in any exchange be measured by the weighted average of the exchanged assets’ FV estimations, where the weights are the inverse of the variances’ estimations. This alternative valuation process accounts for the uncertainty involved in estimating the FV of each of the asset in the exchange. The proposed method suits all types of exchanges: monetary and non-monetary. In a monetary transaction, the weighted average equals the cash paid because the variance of its FV is nil.

  9. Estimating the cost of healthcare delivery in three hospitals in ...

    African Journals Online (AJOL)

    Objective: The cost burden (called full cost) of providing health services at a referral, a district and a mission hospital in Ghana were determined. Methods: Standard cost-finding and cost analysis tools recommended by World Health Organization are used to analyse 2002 and 2003 hospital data. Full cost centre costs were ...

  10. Melanoma costs: a dynamic model comparing estimated overall costs of various clinical stages.

    Science.gov (United States)

    Alexandrescu, Doru Traian

    2009-11-15

    The rapidly increasing incidence of melanoma occurs at the same time as an increase in general healthcare costs, particularly the expenses associated with cancer care. Previous cost estimates in melanoma have not utilized a dynamic model considering the evolution of the disease and have not integrated the multiple costs associated with different aspects of medical interventions and patient-related factors. Futhermore, previous calculations have not been updated to reflect the modern tendencies in healthcare costs. We designed a comprehensive model of expenses in melanoma that considers the dynamic costs generated by the natural progression of the disease, which produces costs associated with treatment, surveillance, loss of income, and terminal care. The complete range of initial clinical (TNM) stages of the disease and initial tumor stages were analyzed in this model and the total healthcare costs for the five years following melanoma presentation at each particular stage were calculated. We have observed dramatic incremental total costs associated with progressively higher initial stages of the disease, ranging from a total of $4,648.48 for in situ tumors to $159,808.17 for Stage IV melanoma. By stage, early lesions associate 30-55 percent of their costs for the treatment of the primary tumor, due to a low rate of recurrence (local, regional, or distant), which limits the need for additional interventions. For in situ melanoma, T1a, and T1b, surveillance is an important contributor to the medical costs, accounting for more than 25 percent of the total cost over 5 years. In contrast, late lesions incur a much larger proportion of their associated costs (up to 80-85%) from the diagnosis and treatment of metastatic disease because of the increased propensity of those lesions to disseminate. This cost increases with increasing tumor stage (from $2,442.17 for T1a to $6,678.00 for T4b). The most expensive items in the medical care of patients with melanoma consist of

  11. Evaluation of cost estimates and calculation methods used by SKB

    International Nuclear Information System (INIS)

    1994-01-01

    The Swedish Nuclear Fuel Management Co. (SKB) has estimated the costs for decommissioning the swedish nuclear power plants and managing the nuclear wastes in a 'traditional' manner i.e. by handling uncertainties through percentage additions. A 'normal' addition is used for uncertainties in specified technical systems. 'Extra' additions are used for systems uncertainties. An alternative method is suggested, using top-down principles for uncertainties, which should be applied successively, giving higher precision as the knowledge accumulates. This type of calculation can help project managers to identify and deal with areas common to different partial projects. A first step in this direction would be to perform sensitivity analyses for the most important calculation parameters. 21 refs

  12. Cost estimate of a nuclear power phaseout in Germany

    International Nuclear Information System (INIS)

    Schmitt, D.

    1999-01-01

    Nuclear power phaseout costing is an extremely complex task, as a multitude of aspects affecting the economy at large as well as specific industrial branches, and both direct and indirect effects are to be identified and considered. Another question arising is the general approach to be taken, as such an estimate may be done e.g. from the angle of an electric utility, or the electricity consumers, tax payers, or that of the national economy. In addition, the strategy and time frame of the phaseout scenario play a major role, which is a decision of policy. The article discusses a number of approaches as addressed above and emphasises that any approach or scenario elaborated is based on very different, specific assumptions requiring individual interpretation of results plus supplementary parameter variation and sensitivity calculations. (orig./CB) [de

  13. Cost estimation of HVDC transmission system of Bangka's NPP candidates

    Science.gov (United States)

    Liun, Edwaren; Suparman

    2014-09-01

    Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

  14. FASTSim: A Model to Estimate Vehicle Efficiency, Cost and Performance

    Energy Technology Data Exchange (ETDEWEB)

    Brooker, A.; Gonder, J.; Wang, L.; Wood, E.; Lopp, S.; Ramroth, L.

    2015-05-04

    The Future Automotive Systems Technology Simulator (FASTSim) is a high-level advanced vehicle powertrain systems analysis tool supported by the U.S. Department of Energy’s Vehicle Technologies Office. FASTSim provides a quick and simple approach to compare powertrains and estimate the impact of technology improvements on light- and heavy-duty vehicle efficiency, performance, cost, and battery batches of real-world drive cycles. FASTSim’s calculation framework and balance among detail, accuracy, and speed enable it to simulate thousands of driven miles in minutes. The key components and vehicle outputs have been validated by comparing the model outputs to test data for many different vehicles to provide confidence in the results. A graphical user interface makes FASTSim easy and efficient to use. FASTSim is freely available for download from the National Renewable Energy Laboratory’s website (see www.nrel.gov/fastsim).

  15. Taking the Evolutionary Road to Developing an In-House Cost Estimate

    Science.gov (United States)

    Jacintho, David; Esker, Lind; Herman, Frank; Lavaque, Rodolfo; Regardie, Myma

    2011-01-01

    This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

  16. 48 CFR 1852.216-84 - Estimated cost and incentive fee.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.216-84 Estimated cost and incentive fee. As prescribed in 1816.406-70(d), insert the following clause: Estimated Cost and Incentive Fee (OCT 1996) The target cost of this contract is $___. The target fee of this contract is $___. The total target cost and target fee as contemplated by the...

  17. Mathematical models for estimating earthquake casualties and damage cost through regression analysis using matrices

    International Nuclear Information System (INIS)

    Urrutia, J D; Bautista, L A; Baccay, E B

    2014-01-01

    The aim of this study was to develop mathematical models for estimating earthquake casualties such as death, number of injured persons, affected families and total cost of damage. To quantify the direct damages from earthquakes to human beings and properties given the magnitude, intensity, depth of focus, location of epicentre and time duration, the regression models were made. The researchers formulated models through regression analysis using matrices and used α = 0.01. The study considered thirty destructive earthquakes that hit the Philippines from the inclusive years 1968 to 2012. Relevant data about these said earthquakes were obtained from Philippine Institute of Volcanology and Seismology. Data on damages and casualties were gathered from the records of National Disaster Risk Reduction and Management Council. This study will be of great value in emergency planning, initiating and updating programs for earthquake hazard reduction in the Philippines, which is an earthquake-prone country.

  18. A parametric cost model for estimating operating and support costs of US Navy (non-nuclear) surface ships

    OpenAIRE

    Brandt, James M.

    1999-01-01

    Approved for public release; distribution is unlimited With few effective decision-making tools to assess the affordability of major weapon systems, management of total ownership costs is continually misunderstood. Cost analysis provides a quick and reliable assessment of affordability. Because there is no standardized method for calculating reliable estimates of operating and support (O&S) costs (the principal component of total ownership cost), this thesis formulates a parametric cost mo...

  19. Handbook for quick cost estimates. A method for developing quick approximate estimates of costs for generic actions for nuclear power plants

    International Nuclear Information System (INIS)

    Ball, J.R.

    1986-04-01

    This document is a supplement to a ''Handbook for Cost Estimating'' (NUREG/CR-3971) and provides specific guidance for developing ''quick'' approximate estimates of the cost of implementing generic regulatory requirements for nuclear power plants. A method is presented for relating the known construction costs for new nuclear power plants (as contained in the Energy Economic Data Base) to the cost of performing similar work, on a back-fit basis, at existing plants. Cost factors are presented to account for variations in such important cost areas as construction labor productivity, engineering and quality assurance, replacement energy, reworking of existing features, and regional variations in the cost of materials and labor. Other cost categories addressed in this handbook include those for changes in plant operating personnel and plant documents, licensee costs, NRC costs, and costs for other government agencies. Data sheets, worksheets, and appropriate cost algorithms are included to guide the user through preparation of rough estimates. A sample estimate is prepared using the method and the estimating tools provided

  20. Handbook for quick cost estimates. A method for developing quick approximate estimates of costs for generic actions for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Ball, J.R.

    1986-04-01

    This document is a supplement to a ''Handbook for Cost Estimating'' (NUREG/CR-3971) and provides specific guidance for developing ''quick'' approximate estimates of the cost of implementing generic regulatory requirements for nuclear power plants. A method is presented for relating the known construction costs for new nuclear power plants (as contained in the Energy Economic Data Base) to the cost of performing similar work, on a back-fit basis, at existing plants. Cost factors are presented to account for variations in such important cost areas as construction labor productivity, engineering and quality assurance, replacement energy, reworking of existing features, and regional variations in the cost of materials and labor. Other cost categories addressed in this handbook include those for changes in plant operating personnel and plant documents, licensee costs, NRC costs, and costs for other government agencies. Data sheets, worksheets, and appropriate cost algorithms are included to guide the user through preparation of rough estimates. A sample estimate is prepared using the method and the estimating tools provided.

  1. Electromagnetic Energy Released in the Subduction (Benioff) Zone in Weeks Previous to Earthquake Occurrence in Central Peru and the Estimation of Earthquake Magnitudes.

    Science.gov (United States)

    Heraud, J. A.; Centa, V. A.; Bleier, T.

    2017-12-01

    During the past four years, magnetometers deployed in the Peruvian coast have been providing evidence that the ULF pulses received are indeed generated at the subduction or Benioff zone and are connected with the occurrence of earthquakes within a few kilometers of the source of such pulses. This evidence was presented at the AGU 2015 Fall meeting, showing the results of triangulation of pulses from two magnetometers located in the central area of Peru, using data collected during a two-year period. Additional work has been done and the method has now been expanded to provide the instantaneous energy released at the stress areas on the Benioff zone during the precursory stage, before an earthquake occurs. Collected data from several events and in other parts of the country will be shown in a sequential animated form that illustrates the way energy is released in the ULF part of the electromagnetic spectrum. The process has been extended in time and geographical places. Only pulses associated with the occurrence of earthquakes are taken into account in an area which is highly associated with subduction-zone seismic events and several pulse parameters have been used to estimate a function relating the magnitude of the earthquake with the value of a function generated with those parameters. The results shown, including the animated data video, constitute additional work towards the estimation of the magnitude of an earthquake about to occur, based on electromagnetic pulses that originated at the subduction zone. The method is providing clearer evidence that electromagnetic precursors in effect conveys physical and useful information prior to the advent of a seismic event

  2. Energetic costs of mange in wolves estimated from infrared thermography

    Science.gov (United States)

    Cross, Paul C.; Almberg, Emily S.; Haase, Catherine G; Hudson, Peter J.; Maloney, Shane K; Metz, Matthew C; Munn, Adam J; Nugent, Paul; Putzeys, Olivier; Stahler, Daniel R.; Stewart, Anya C; Smith, Doug W.

    2016-01-01

    Parasites, by definition, extract energy from their hosts and thus affect trophic and food web dynamics even when the parasite may have limited effects on host population size. We studied the energetic costs of mange (Sarcoptes scabiei) in wolves (Canis lupus) using thermal cameras to estimate heat losses associated with compromised insulation during the winter. We combined the field data of known, naturally infected wolves with data set on captive wolves with shaved patches of fur as a positive control to simulate mange-induced hair loss. We predict that during the winter in Montana, more severe mange infection increases heat loss by around 5.2 to 12 MJ per night (1240 to 2850 kcal, or a 65% to 78% increase) for small and large wolves, respectively accounting for wind effects. To maintain body temperature would require a significant proportion of a healthy wolf's total daily energy demands (18-22 MJ/day). We also predict how these thermal costs may increase in colder climates by comparing our predictions in Bozeman, Montana to those from a place with lower ambient temperatures (Fairbanks, Alaska). Contrary to our expectations, the 14°C differential between these regions was not as important as the potential differences in wind speed. These large increases in energetic demands can be mitigated by either increasing consumption rates or decreasing other energy demands. Data from GPS-collared wolves indicated that healthy wolves move, on average, 17 km per day, which was reduced by 1.5, 1.8 and 6.5 km for light, medium, and severe hair loss. In addition, the wolf with the most hair loss was less active at night and more active during the day, which is the converse of the movement patterns of healthy wolves. At the individual level mange infections create significant energy demands and altered behavioral patterns, this may have cascading effects on prey consumption rates, food web dynamics, predator-prey interactions, and scavenger communities.

  3. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  4. Estimating pharmacy level prescription drug acquisition costs for third-party reimbursement.

    Science.gov (United States)

    Kreling, D H; Kirk, K W

    1986-07-01

    Accurate payment for the acquisition costs of drug products dispensed is an important consideration in a third-party prescription drug program. Two alternative methods of estimating these costs among pharmacies were derived and compared. First, pharmacists were surveyed to determine the purchase discounts offered to them by wholesalers. A 10.00% modal and 11.35% mean discount resulted for 73 responding pharmacists. Second, cost-plus percents derived from gross profit margins of wholesalers were calculated and applied to wholesaler product costs to estimate pharmacy level acquisition costs. Cost-plus percents derived from National Median and Southwestern Region wholesaler figures were 9.27% and 10.10%, respectively. A comparison showed the two methods of estimating acquisition costs would result in similar acquisition cost estimates. Adopting a cost-plus estimating approach is recommended because it avoids potential pricing manipulations by wholesalers and manufacturers that would negate improvements in drug product reimbursement accuracy.

  5. Accuracy of multiecho magnitude-based MRI (M-MRI) for estimation of hepatic proton density fat fraction (PDFF) in children.

    Science.gov (United States)

    Zand, Kevin A; Shah, Amol; Heba, Elhamy; Wolfson, Tanya; Hamilton, Gavin; Lam, Jessica; Chen, Joshua; Hooker, Jonathan C; Gamst, Anthony C; Middleton, Michael S; Schwimmer, Jeffrey B; Sirlin, Claude B

    2015-11-01

    To assess accuracy of magnitude-based magnetic resonance imaging (M-MRI) in children to estimate hepatic proton density fat fraction (PDFF) using two to six echoes, with magnetic resonance spectroscopy (MRS) -measured PDFF as a reference standard. This was an IRB-approved, HIPAA-compliant, single-center, cross-sectional, retrospective analysis of data collected prospectively between 2008 and 2013 in children with known or suspected nonalcoholic fatty liver disease (NAFLD). Two hundred eighty-six children (8-20 [mean 14.2 ± 2.5] years; 182 boys) underwent same-day MRS and M-MRI. Unenhanced two-dimensional axial spoiled gradient-recalled-echo images at six echo times were obtained at 3T after a single low-flip-angle (10°) excitation with ≥ 120-ms recovery time. Hepatic PDFF was estimated using the first two, three, four, five, and all six echoes. For each number of echoes, accuracy of M-MRI to estimate PDFF was assessed by linear regression with MRS-PDFF as reference standard. Accuracy metrics were regression intercept, slope, average bias, and R(2) . MRS-PDFF ranged from 0.2-40.4% (mean 13.1 ± 9.8%). Using three to six echoes, regression intercept, slope, and average bias were 0.46-0.96%, 0.99-1.01, and 0.57-0.89%, respectively. Using two echoes, these values were 2.98%, 0.97, and 2.72%, respectively. R(2) ranged 0.98-0.99 for all methods. Using three to six echoes, M-MRI has high accuracy for hepatic PDFF estimation in children. © 2015 Wiley Periodicals, Inc.

  6. Report on estimated nuclear energy related cost for fiscal 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The report first describes major actions planned to be taken in Japan in fiscal 1991 in the field of nuclear energy utilization. Major activities to be made for comprehensive strengthening of safety assurance measures are described, focusing on improvement of nuclear energy related safety regulations, promotion of research for safety assurance, improvement and strengthening of disaster prevention measures, environmental radioactivity surveys, control of exposure of workers engaged in radioactivity related jobs, etc. The report then describes actions required for the establishment of a nuclear fuel cycle, focusing on the procurement of uranium resources, establishment of a uranium enrichment process, reprocessing of spent fuel, application of recovered uranium, etc. Other activities are required for the development of new type reactors, effective application of plutonium, development of basic techniques, international contributions, cooperation with the public. Then, the report summarizes estimated costs required for the activities to be performed by the Japan Atomic Energy Research Institute, Power Reactor and Nuclear Fuel Development Corporation, National Institute of Radiological Sciences, Institute of Physical and Chemical Research. (N.K.)

  7. A level playing field: Obtaining consistent cost estimates for advanced reactor designs

    International Nuclear Information System (INIS)

    Hudson, C.R. II; Rohm, H.H.; Humphreys, J.R. Jr.

    1987-01-01

    Rules and guidelines for developing cost estimates are given which provide a means for presenting cost estimates for advanced concepts on a consistent and equitable basis. For advanced reactor designs, the scope of a cost estimate includes the plant capital cost, the operating and maintenance cost, the fuel cycle cost, and the cost of decommissioning. Each element is subdivided as is necessary to provide a common reporting format for all power plant concepts. The total generation cost is taken to be a suitable choice for a summary figure of merit. To test the application of the rules and guidelines as well as developing reference costs for current technologies, several different sized coal and pressurized water reactor plant cost estimates have been prepared

  8. Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage

    Energy Technology Data Exchange (ETDEWEB)

    Glatzmaier, G.

    2011-12-01

    This report provides an update on the previous cost model for thermal energy storage (TES) systems. The update allows NREL to estimate the costs of such systems that are compatible with the higher operating temperatures associated with advanced power cycles. The goal of the Department of Energy (DOE) Solar Energy Technology Program is to develop solar technologies that can make a significant contribution to the United States domestic energy supply. The recent DOE SunShot Initiative sets a very aggressive cost goal to reach a Levelized Cost of Energy (LCOE) of 6 cents/kWh by 2020 with no incentives or credits for all solar-to-electricity technologies.1 As this goal is reached, the share of utility power generation that is provided by renewable energy sources is expected to increase dramatically. Because Concentrating Solar Power (CSP) is currently the only renewable technology that is capable of integrating cost-effective energy storage, it is positioned to play a key role in providing renewable, dispatchable power to utilities as the share of power generation from renewable sources increases. Because of this role, future CSP plants will likely have as much as 15 hours of Thermal Energy Storage (TES) included in their design and operation. As such, the cost and performance of the TES system is critical to meeting the SunShot goal for solar technologies. The cost of electricity from a CSP plant depends strongly on its overall efficiency, which is a product of two components - the collection and conversion efficiencies. The collection efficiency determines the portion of incident solar energy that is captured as high-temperature thermal energy. The conversion efficiency determines the portion of thermal energy that is converted to electricity. The operating temperature at which the overall efficiency reaches its maximum depends on many factors, including material properties of the CSP plant components. Increasing the operating temperature of the power generation

  9. Understanding the roles of faith-based health-care providers in Africa: review of the evidence with a focus on magnitude, reach, cost, and satisfaction.

    Science.gov (United States)

    Olivier, Jill; Tsimpo, Clarence; Gemignani, Regina; Shojo, Mari; Coulombe, Harold; Dimmock, Frank; Nguyen, Minh Cong; Hines, Harrison; Mills, Edward J; Dieleman, Joseph L; Haakenstad, Annie; Wodon, Quentin

    2015-10-31

    At a time when many countries might not achieve the health targets of the Millennium Development Goals and the post-2015 agenda for sustainable development is being negotiated, the contribution of faith-based health-care providers is potentially crucial. For better partnership to be achieved and for health systems to be strengthened by the alignment of faith-based health-providers with national systems and priorities, improved information is needed at all levels. Comparisons of basic factors (such as magnitude, reach to poor people, cost to patients, modes of financing, and satisfaction of patients with the services received) within faith-based health-providers and national systems show some differences. As the first report in the Series on faith-based health care, we review a broad body of published work and introduce some empirical evidence on the role of faith-based health-care providers, with a focus on Christian faith-based health providers in sub-Saharan Africa (on which the most detailed documentation has been gathered). The restricted and diverse evidence reported supports the idea that faith-based health providers continue to play a part in health provision, especially in fragile health systems, and the subsequent reports in this Series review controversies in faith-based health care and recommendations for how public and faith sectors might collaborate more effectively. Copyright © 2015 Elsevier Ltd. All rights reserved.

  10. ABC estimation of unit costs for emergency department services.

    Science.gov (United States)

    Holmes, R L; Schroeder, R E

    1996-04-01

    Rapid evolution of the health care industry forces managers to make cost-effective decisions. Typical hospital cost accounting systems do not provide emergency department managers with the information needed, but emergency department settings are so complex and dynamic as to make the more accurate activity-based costing (ABC) system prohibitively expensive. Through judicious use of the available traditional cost accounting information and simple computer spreadsheets. managers may approximate the decision-guiding information that would result from the much more costly and time-consuming implementation of ABC.

  11. Final report on cost estimate of forward superconducting air core toroid

    International Nuclear Information System (INIS)

    Fields, T.

    1992-12-01

    An independent cost-estimate for key components of the forward superconducting air core toroid (ACT) was obtained in May 1992 from an experienced manufacturer of large cryogenic vessels. This new cost estimate is summarized in this report. It implies that a suitably designed ACT may have a cost which is approximately equal to that of the presently designed SDC forward iron core toroid

  12. Estimation of external costs of energy production in Finland

    International Nuclear Information System (INIS)

    Estlander, A.; Otterstroem, T.

    1994-01-01

    The goal of the project is to develop a method for estimation of external costs of energy production in Finland. The purpose of the method is to take into account all the most important impacts on health, materials and the environment. The study will assess environmental effects of emissions from Finnish energy production on people and the environment locally (population centres), nationally (Finland) and globally. The different energy production forms to be included in the study are heat and electric energy generated with coal, natural gas, fuel oil and peat (not industry's energy production). Local and national environmental impact assessment is carried out within the Finnish borders. The economic influence of emissions (in particular greenhouse gases) originating outside Finland but with global impact will also be assessed, as far as Finland is concerned. When studying the amounts of emissions the whole fuel chain is taken into account: production, processing or transport, storage in the different stages of the chain of use, and end use. The main components under review are SO 2 , NO x , CO 2 , H x C y , CO, particulates and a couple of heavy metals. In addition. the study considers ozone (O 3 ), which is formed in the atmosphere. The primary monetary valuation method used is the indirect monetarization. which is based on dose-response functions and the use of both market prices and willingness-to-pay assessments. The method to be developed during the project for monetary valuation of effects caused by emissions on health, materials and the environment can be utilized in further monetarization studies. The results of the work can used to assess the profitability of energy production plants and energy companies from the economic point of view

  13. 48 CFR 9904.401 - Cost accounting standard-consistency in estimating, accumulating and reporting costs.

    Science.gov (United States)

    2010-10-01

    ... Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401 Cost... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard...

  14. Cost estimation for solid waste management in industrialising regions – Precedents, problems and prospects

    International Nuclear Information System (INIS)

    Parthan, Shantha R.; Milke, Mark W.; Wilson, David C.; Cocks, John H.

    2012-01-01

    Highlights: ► We review cost estimation approaches for solid waste management. ► Unit cost method and benchmarking techniques used in industrialising regions (IR). ► Variety in scope, quality and stakeholders makes cost estimation challenging in IR. ► Integrate waste flow and cost models using cost functions to improve cost planning. - Abstract: The importance of cost planning for solid waste management (SWM) in industrialising regions (IR) is not well recognised. The approaches used to estimate costs of SWM can broadly be classified into three categories – the unit cost method, benchmarking techniques and developing cost models using sub-approaches such as cost and production function analysis. These methods have been developed into computer programmes with varying functionality and utility. IR mostly use the unit cost and benchmarking approach to estimate their SWM costs. The models for cost estimation, on the other hand, are used at times in industrialised countries, but not in IR. Taken together, these approaches could be viewed as precedents that can be modified appropriately to suit waste management systems in IR. The main challenges (or problems) one might face while attempting to do so are a lack of cost data, and a lack of quality for what data do exist. There are practical benefits to planners in IR where solid waste problems are critical and budgets are limited.

  15. A new approach for product cost estimation using data envelopment analysis

    Directory of Open Access Journals (Sweden)

    Adil Salam

    2012-10-01

    Full Text Available Cost estimation of new products has always been difficult as only few design, manufacturing and operational features will be known. In these situations, parametric or non-parametric methods are commonly used to estimate the cost of a product given the corresponding cost drivers. The parametric models use priori determined cost function where the parameters of the function are evaluated from historical data. Non-parametric methods, on the other hand, attempt to fit curves to the historic data without predetermined function. In both methods, it is assumed that the historic data used in the analysis is a true representation of the relation between the cost drivers and the corresponding costs. However, because of efficiency variations of the manufacturers and suppliers, changes in supplier selections, market fluctuations, and several other reasons, certain costs in the historic data may be too high whereas other costs may represent better deals for their corresponding cost drivers. Thus, it may be important to rank the historic data and identify benchmarks and estimate the target costs of the product based on these benchmarks. In this paper, a novel adaptation of cost drivers and cost data is introduced in order to use data envelopment analysis for the purpose of ranking cost data and identify benchmarks, and then estimate the target costs of a new product based on these benchmarks. An illustrative case study has been presented for the cost estimation of landing gears of an aircraft manufactured by an aerospace company located in Montreal, CANADA.

  16. Estimating direct and indirect costs of premenstrual syndrome.

    Science.gov (United States)

    Borenstein, Jeff; Chiou, Chiun-Fang; Dean, Bonnie; Wong, John; Wade, Sally

    2005-01-01

    To quantify the economic impact of premenstrual syndrome (PMS) on the employer. Data were collected from 374 women aged 18-45 with regular menses. Direct costs were quantified using administrative claims of these patients and the Medicare Fee Schedule. Indirect costs were quantified by both self-reported days of work missed and lost productivity at work. Regression analyses were used to develop a model to project PMS-related direct and indirect costs. A total of 29.6% (n = 111) of the participants were diagnosed with PMS. A PMS diagnosis was associated with an average annual increase of $59 in direct costs (P increase in direct medical costs and a large increase in indirect costs.

  17. DC-Obesity: A New Model for Estimating Differential Lifetime Costs of Overweight and Obesity by Socioeconomic Status.

    Science.gov (United States)

    Sonntag, Diana; Jarczok, Marc N; Ali, Shehzad

    2017-09-01

    The aim of this study was to quantify the magnitude of lifetime costs of overweight and obesity by socioeconomic status (SES). Differential Costs (DC)-Obesity is a new model that uses time-to-event simulation and the Markov modeling approach to compare lifetime excess costs of overweight and obesity among individuals with low, middle, and high SES. SES was measured by a multidimensional aggregated index based on level of education, occupational class, and income by using longitudinal data of the German Socioeconomic Panel (SOEP). Random-effects meta-analysis was applied to combine estimates of (in)direct costs of overweight and obesity. DC-Obesity brings attention to opposite socioeconomic gradients in lifetime costs due to obesity compared to overweight. Compared to individuals with obesity and high SES, individuals with obesity and low SES had lifetime excess costs that were two times higher (€8,526). In contrast, these costs were 20% higher in groups with overweight and high SES than in groups with overweight and low SES (€2,711). The results of this study indicate that SES may play a pivotal role in designing cost-effective and sustainable interventions to prevent and treat overweight and obesity. DC-Obesity may help public policy planners to make informed decisions about obesity programs targeted at vulnerable SES groups. © 2017 The Obesity Society.

  18. Cost Estimates Of Concentrated Photovoltaic Heat Sink Production

    Science.gov (United States)

    2016-06-01

    PV), return on investment (ROI) 15. NUMBER OF PAGES 59 16. PRICE CODE 17. SECURITY CLASSIFICATION OF REPORT Unclassified 18. SECURITY...improvements increase overall system returns on investment and 11 provide pathways for further reduction in system costs (Phillips et al., 2015). Phillips...generation. As the CPV market has matured, production costs have come down to near flat-panel photovoltaic (PV) production costs. CPV units

  19. A comparison of two methods for estimating the technical costs of external beam radiation therapy

    International Nuclear Information System (INIS)

    Hayman, James A.; Lash, Kathy A.; Tao, May L.; Halman, Marc A.

    2000-01-01

    Purpose: To accurately assess the cost-effectiveness of treatment with external beam radiation, it is necessary to have accurate estimates of its cost. One of the most common methods for estimating technical costs has been to convert Medicare charges into costs using Medicare Cost-to-Charge Ratios (CCR). More recently, health care organizations have begun to invest in sophisticated cost-accounting systems (CAS) that are capable of providing procedure-specific cost estimates. The purpose of this study was to examine whether these competing approaches result in similar cost estimates for four typical courses of external beam radiation therapy (EBRT). Methods and Materials: Technical costs were estimated for the following treatment courses: 1) a palliative 'simple' course of 10 fractions using a single field without blocks; 2) a palliative 'complex' course of 10 fractions using two opposed fields with custom blocks; 3) a curative course of 30 fractions for breast cancer using tangent fields followed by an electron beam boost; and 4) a curative course of 35 fractions for prostate cancer using CT-planning and a 4-field technique. Costs were estimated using the CCR approach by multiplying the number of units of each procedure billed by its Medicare charge and CCR and then summing these costs. Procedure-specific cost estimates were obtained from a cost-accounting system, and overall costs were then estimated for the CAS approach by multiplying the number of units billed by the appropriate unit cost estimate and then summing these costs. All costs were estimated using data from 1997. The analysis was also repeated using data from another academic institution to estimate their costs using the CCR and CAS methods, as well as the appropriate relative value units (RVUs) and conversion factor from the 1997 Medicare Fee Schedule to estimate Medicare reimbursement for the four treatment courses. Results: The estimated technical costs for the CCR vs. CAS approaches for the four

  20. 48 CFR 36.203 - Government estimate of construction costs.

    Science.gov (United States)

    2010-10-01

    ... personnel whose official duties require knowledge of the estimate. An exception to this rule may be made... necessary to arrive at a fair and reasonable price. The overall amount of the Government's estimate shall...

  1. Estimation of marginal costs at existing waste treatment facilities

    DEFF Research Database (Denmark)

    Martinez Sanchez, Veronica; Hulgaard, Tore; Hindsgaul, Claus

    2016-01-01

    , marginal costs were not (provided a response was initiated at the WtE to keep constant the utilized thermal capacity). Failing to systematically address and include costs in existing waste facilities in decision-making may unintendedly lead to higher overall costs at societal level. To avoid misleading...... a constant thermal load, (ii) Refused-Derived-Fuel (RDF) was included to maintain a constant thermal load, or (iii) no reaction occurred resulting in a reduced waste throughput without full utilization of the facility capacity. Results demonstrated that marginal costs of diversion from WtE were up to eleven...

  2. Cost estimates for flat plate and concentrator collector arrays

    Science.gov (United States)

    Shimada, K.

    1982-01-01

    The current module and installation costs for the U.S. National Photovoltaic Program's grid-connected systems are significantly higher than required for economic viability of this alternative. Attention is accordingly given to the prospects for installed module cost reductions in flat plate, linear focus Fresnel concentrator, and point focus Fresnel concentrator candidate systems. Cost projections indicate that all three systems would meet near-term and midterm goals, provided that module costs of $2.80/W(p) and $0.70/W(p), respectively, are met. The point focus Fresnel system emerges as the most viable for the near term.

  3. A practical approach for calculating reliable cost estimates from observational data: application to cost analyses in maternal and child health.

    Science.gov (United States)

    Salemi, Jason L; Comins, Meg M; Chandler, Kristen; Mogos, Mulubrhan F; Salihu, Hamisu M

    2013-08-01

    Comparative effectiveness research (CER) and cost-effectiveness analysis are valuable tools for informing health policy and clinical care decisions. Despite the increased availability of rich observational databases with economic measures, few researchers have the skills needed to conduct valid and reliable cost analyses for CER. The objectives of this paper are to (i) describe a practical approach for calculating cost estimates from hospital charges in discharge data using publicly available hospital cost reports, and (ii) assess the impact of using different methods for cost estimation in maternal and child health (MCH) studies by conducting economic analyses on gestational diabetes (GDM) and pre-pregnancy overweight/obesity. In Florida, we have constructed a clinically enhanced, longitudinal, encounter-level MCH database covering over 2.3 million infants (and their mothers) born alive from 1998 to 2009. Using this as a template, we describe a detailed methodology to use publicly available data to calculate hospital-wide and department-specific cost-to-charge ratios (CCRs), link them to the master database, and convert reported hospital charges to refined cost estimates. We then conduct an economic analysis as a case study on women by GDM and pre-pregnancy body mass index (BMI) status to compare the impact of using different methods on cost estimation. Over 60 % of inpatient charges for birth hospitalizations came from the nursery/labor/delivery units, which have very different cost-to-charge markups (CCR = 0.70) than the commonly substituted hospital average (CCR = 0.29). Using estimated mean, per-person maternal hospitalization costs for women with GDM as an example, unadjusted charges ($US14,696) grossly overestimated actual cost, compared with hospital-wide ($US3,498) and department-level ($US4,986) CCR adjustments. However, the refined cost estimation method, although more accurate, did not alter our conclusions that infant/maternal hospitalization costs

  4. Fast Reactor Fuel Cycle Cost Estimates for Advanced Fuel Cycle Studies

    International Nuclear Information System (INIS)

    Harrison, Thomas

    2013-01-01

    Presentation Outline: • Why Do I Need a Cost Basis?; • History of the Advanced Fuel Cycle Cost Basis; • Description of the Cost Basis; • Current Work; • Fast Reactor Fuel Cycle Applications; • Sample Fuel Cycle Cost Estimate Analysis; • Future Work

  5. Estimating study costs for use in VOI, a study of dutch publicly funded drug related research

    NARCIS (Netherlands)

    Van Asselt, A.D.; Ramaekers, B.L.; Corro Ramos, I.; Joore, M.A.; Al, M.J.; Lesman-Leegte, I.; Postma, M.J.; Vemer, P.; Feenstra, T.F.

    2016-01-01

    Objectives: To perform value of information (VOI) analyses, an estimate of research costs is needed. However, reference values for such costs are not available. This study aimed to analyze empirical data on research budgets and, by means of a cost tool, provide an overview of costs of several types

  6. Methods for estimating the magnitude and frequency of floods for urban and small, rural streams in Georgia, South Carolina, and North Carolina, 2011

    Science.gov (United States)

    Feaster, Toby D.; Gotvald, Anthony J.; Weaver, J. Curtis

    2014-01-01

    Reliable estimates of the magnitude and frequency of floods are essential for the design of transportation and water-conveyance structures, flood-insurance studies, and flood-plain management. Such estimates are particularly important in densely populated urban areas. In order to increase the number of streamflow-gaging stations (streamgages) available for analysis, expand the geographical coverage that would allow for application of regional regression equations across State boundaries, and build on a previous flood-frequency investigation of rural U.S Geological Survey streamgages in the Southeast United States, a multistate approach was used to update methods for determining the magnitude and frequency of floods in urban and small, rural streams that are not substantially affected by regulation or tidal fluctuations in Georgia, South Carolina, and North Carolina. The at-site flood-frequency analysis of annual peak-flow data for urban and small, rural streams (through September 30, 2011) included 116 urban streamgages and 32 small, rural streamgages, defined in this report as basins draining less than 1 square mile. The regional regression analysis included annual peak-flow data from an additional 338 rural streamgages previously included in U.S. Geological Survey flood-frequency reports and 2 additional rural streamgages in North Carolina that were not included in the previous Southeast rural flood-frequency investigation for a total of 488 streamgages included in the urban and small, rural regression analysis. The at-site flood-frequency analyses for the urban and small, rural streamgages included the expected moments algorithm, which is a modification of the Bulletin 17B log-Pearson type III method for fitting the statistical distribution to the logarithms of the annual peak flows. Where applicable, the flood-frequency analysis also included low-outlier and historic information. Additionally, the application of a generalized Grubbs-Becks test allowed for the

  7. Validation of generic cost estimates for construction-related activities at nuclear power plants: Final report

    International Nuclear Information System (INIS)

    Simion, G.; Sciacca, F.; Claiborne, E.; Watlington, B.; Riordan, B.; McLaughlin, M.

    1988-05-01

    This report represents a validation study of the cost methodologies and quantitative factors derived in Labor Productivity Adjustment Factors and Generic Methodology for Estimating the Labor Cost Associated with the Removal of Hardware, Materials, and Structures From Nuclear Power Plants. This cost methodology was developed to support NRC analysts in determining generic estimates of removal, installation, and total labor costs for construction-related activities at nuclear generating stations. In addition to the validation discussion, this report reviews the generic cost analysis methodology employed. It also discusses each of the individual cost factors used in estimating the costs of physical modifications at nuclear power plants. The generic estimating approach presented uses the /open quotes/greenfield/close quotes/ or new plant construction installation costs compiled in the Energy Economic Data Base (EEDB) as a baseline. These baseline costs are then adjusted to account for labor productivity, radiation fields, learning curve effects, and impacts on ancillary systems or components. For comparisons of estimated vs actual labor costs, approximately four dozen actual cost data points (as reported by 14 nuclear utilities) were obtained. Detailed background information was collected on each individual data point to give the best understanding possible so that the labor productivity factors, removal factors, etc., could judiciously be chosen. This study concludes that cost estimates that are typically within 40% of the actual values can be generated by prudently using the methodologies and cost factors investigated herein

  8. New Frontiers in Characterization of Sub-Catalog Microseismicity: Utilizing Inter-Event Waveform Cross Correlation for Estimating Precise Locations, Magnitudes, and Focal Mechanisms of Tiny Earthquakes

    Science.gov (United States)

    Ellsworth, W. L.; Shelly, D. R.; Hardebeck, J.; Hill, D. P.

    2017-12-01

    Microseismicity often conveys the most direct information about active processes in the earth's subsurface. However, routine network processing typically leaves most earthquakes uncharacterized. These "sub-catalog" events can provide critical clues to ongoing processes in the source region. To address this issue, we have developed waveform-based processing that leverages the existing routine catalog of earthquakes to detect and characterize "sub-catalog" events (those absent in routine catalogs). By correlating waveforms of cataloged events with the continuous data stream, we 1) identify events with similar waveform signatures in the continuous data across multiple stations, 2) precisely measure relative time lags across these stations for both P- and S-wave time windows, and 3) estimate the relative polarity between events by the sign of the peak absolute value correlations and its height above the secondary peak. When combined, these inter-event comparisons yield robust measurements, which enable sensitive event detection, relative relocation, and relative magnitude estimation. The most recent addition, focal mechanisms derived from correlation-based relative polarities, addresses a significant shortcoming in microseismicity analyses (see Shelly et al., JGR, 2016). Depending on the application, we can characterize 2-10 times as many events as included in the initial catalog. This technique is particularly well suited for compact zones of active seismicity such as seismic swarms. Application to a 2014 swarm in Long Valley Caldera, California, illuminates complex patterns of faulting that would have otherwise remained obscured. The prevalence of such features in other environments remains an important, as yet unresolved, question.

  9. Systematic methodology for estimating direct capital costs for blanket tritium processing systems

    International Nuclear Information System (INIS)

    Finn, P.A.

    1985-01-01

    This paper describes the methodology developed for estimating the relative capital costs of blanket processing systems. The capital costs of the nine blanket concepts selected in the Blanket Comparison and Selection Study are presented and compared

  10. Estimated incident cost savings in shipping due to inspections

    NARCIS (Netherlands)

    Knapp, S.; Bijwaard, G.E.; Heij, C.

    2011-01-01

    The effectiveness of safety inspections of ships has been analysed from various angles, but until now, relatively little attention has been given to translate risk reduction into incident cost savings. This paper provides a monetary quantification of the cost savings that can be attributed to port

  11. A building cost estimation method for inland ships

    NARCIS (Netherlands)

    Hekkenberg, R.G.

    2014-01-01

    There is very little publicly available data about the building cost of inland ships, especially for ships that have dimensions that differ significantly from those of common ships. Also, no methods to determine the building cost of inland ships are described in literature. In this paper, a method

  12. Estimating flood magnitude and frequency at gaged and ungaged sites on streams in Alaska and conterminous basins in Canada, based on data through water year 2012

    Science.gov (United States)

    Curran, Janet H.; Barth, Nancy A.; Veilleux, Andrea G.; Ourso, Robert T.

    2016-03-16

    Estimates of the magnitude and frequency of floods are needed across Alaska for engineering design of transportation and water-conveyance structures, flood-insurance studies, flood-plain management, and other water-resource purposes. This report updates methods for estimating flood magnitude and frequency in Alaska and conterminous basins in Canada. Annual peak-flow data through water year 2012 were compiled from 387 streamgages on unregulated streams with at least 10 years of record. Flood-frequency estimates were computed for each streamgage using the Expected Moments Algorithm to fit a Pearson Type III distribution to the logarithms of annual peak flows. A multiple Grubbs-Beck test was used to identify potentially influential low floods in the time series of peak flows for censoring in the flood frequency analysis.For two new regional skew areas, flood-frequency estimates using station skew were computed for stations with at least 25 years of record for use in a Bayesian least-squares regression analysis to determine a regional skew value. The consideration of basin characteristics as explanatory variables for regional skew resulted in improvements in precision too small to warrant the additional model complexity, and a constant model was adopted. Regional Skew Area 1 in eastern-central Alaska had a regional skew of 0.54 and an average variance of prediction of 0.45, corresponding to an effective record length of 22 years. Regional Skew Area 2, encompassing coastal areas bordering the Gulf of Alaska, had a regional skew of 0.18 and an average variance of prediction of 0.12, corresponding to an effective record length of 59 years. Station flood-frequency estimates for study sites in regional skew areas were then recomputed using a weighted skew incorporating the station skew and regional skew. In a new regional skew exclusion area outside the regional skew areas, the density of long-record streamgages was too sparse for regional analysis and station skew was used

  13. Estimating the costs of nuclear power: benchmarks and uncertainties

    International Nuclear Information System (INIS)

    Leveque, Francois

    2013-05-01

    The debate on this topic is fairly confusing. Some present electricity production using nuclear power as an affordable solution, others maintain it is too expensive. These widely divergent views prompt fears among consumers and voters that they are being manipulated: each side is just defending its own interests and the true cost of nuclear power is being concealed. Companies and non-government organizations certainly adopt whatever position suits them best. But at the same time, the notion of just one 'true' cost is misleading. As we shall see in this paper there is no such thing as the cost of nuclear power: we must reason in terms of costs and draw a distinction between a private cost and a social cost. The private cost is what an operator examines before deciding whether it is opportune to build a new nuclear power station. This cost varies between different investors, particularly as a function of their attitude to risks. On the other hand the social cost weighs on society, which may take into account the risk of proliferation, or the benefits of avoiding carbon-dioxide emissions, among others. The cost of actually building new plant differs from one country to the next. So deciding whether nuclear power is profitable or not, a benefit for society or not, does not involve determining the real cost, but rather compiling data, developing methods and formulating hypotheses. It is not as easy as inundating the general public with contradictory figures, but it is a more effective way of casting light on economic decisions by industry and government. Without evaluating the costs it is impossible to establish the cost price, required to compare electricity production using nuclear power and rival technologies. Would it be preferable to build a gas-powered plant, a nuclear reactor or a wind farm? Which technology yields the lowest cost per KWh? Under what conditions - financial terms, regulatory framework, carbon pricing - will private investors see an adequate return

  14. Trends in nuclear power plant capital-investment cost estimates - 1976 to 1982

    International Nuclear Information System (INIS)

    Bowers, H.I.; Fuller, L.C.; Myers, M.L.

    1983-09-01

    This report describes trends in power plant capital investment cost estimates over the time period from 1976 to 1982. A review of economic parameters, inflation and escalation rates and cost of money, and a review of cost-size scaling relationships are included. Reference cost estimates are provided for light-water reactor and coal-fired electric power plants based on safety and environmental regulations in effect in January 1982. The sensitivity of the reference cost estimates to numerous economic parameters is analyzed

  15. Technical and economic assessment of solar hybrid repowering: conceptual design and cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    This volume contains the appendix to the conceptual design and cost estimate report on solar repowering the Reeves Unit No. 2 power plant in Albuquerque, New Mexico. Included are the engineering drawings and the work breakdown structure estimate report. (WHK)

  16. Procedures and models for estimating preconstruction costs of highway projects.

    Science.gov (United States)

    2012-07-01

    This study presents data driven and component based PE cost prediction models by utilizing critical factors retrieved from ten years of historical project data obtained from ODOT roadway division. The study used factor analysis of covariance and corr...

  17. Cost estimation for a theta-pinch reactor

    International Nuclear Information System (INIS)

    Coultas, T.A.; Cook, J.M.; Crnkovich, P.; Dauzvardis, P.

    1976-02-01

    A simulation of a theta-pinch fusion power plant has been completed to the point where economic feasibility can be examined. A PL/I cost subprogram is presented for interfacing with the computer code TPFPP. This code is then used to obtain a first approximation of the costs for the reactor. Independent geometrical and plant design parameters are varied over a wide range, with simultaneous variation of magnetic field, minor first wall radius, and plasma maximum compression. The study indicates that the plant energy balance must be favorable, availability must be high, and major component costs must be low to achieve economical results. Although costing uncertainties remain, it is clear that development of easy and rapid replacement methods for reactor components is essential and that new staging concepts to reduce the implosion energy requirement must be pursued

  18. Estimating the Costs of Military Operations in Iraq

    National Research Council Canada - National Science Library

    Gilmore, J. M

    2007-01-01

    This testimony, given by J. Michael Gilmore, Assistant Director for National Security, before the Committee on the Budget, United States Senate, discusses the costs of operations in the Iraq theater and issues associated...

  19. Socio-economic costs of indoor air pollution: A tentative estimation for some pollutants of health interest in France.

    Science.gov (United States)

    Boulanger, Guillaume; Bayeux, Thomas; Mandin, Corinne; Kirchner, Séverine; Vergriette, Benoit; Pernelet-Joly, Valérie; Kopp, Pierre

    2017-07-01

    An evaluation of the socio-economic costs of indoor air pollution can facilitate the development of appropriate public policies. For the first time in France, such an evaluation was conducted for six selected pollutants: benzene, trichloroethylene, radon, carbon monoxide, particles (PM 2.5 fraction), and environmental tobacco smoke (ETS). The health impacts of indoor exposure were either already available in published works or were calculated. For these calculations, two approaches were followed depending on the available data: the first followed the principles of quantitative health risk assessment, and the second was based on concepts and methods related to the health impact assessment. For both approaches, toxicological data and indoor concentrations related to each target pollutant were used. External costs resulting from mortality, morbidity (life quality loss) and production losses attributable to these health impacts were assessed. In addition, the monetary costs for the public were determined. Indoor pollution associated with the selected pollutants was estimated to have cost approximately €20 billion in France in 2004. Particles contributed the most to the total cost (75%), followed by radon. Premature death and the costs of the quality of life loss accounted for approximately 90% of the total cost. Despite the use of different methods and data, similar evaluations previously conducted in other countries yielded figures within the same order of magnitude. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Estimation of marginal costs at existing waste treatment facilities.

    Science.gov (United States)

    Martinez-Sanchez, Veronica; Hulgaard, Tore; Hindsgaul, Claus; Riber, Christian; Kamuk, Bettina; Astrup, Thomas F

    2016-04-01

    This investigation aims at providing an improved basis for assessing economic consequences of alternative Solid Waste Management (SWM) strategies for existing waste facilities. A bottom-up methodology was developed to determine marginal costs in existing facilities due to changes in the SWM system, based on the determination of average costs in such waste facilities as function of key facility and waste compositional parameters. The applicability of the method was demonstrated through a case study including two existing Waste-to-Energy (WtE) facilities, one with co-generation of heat and power (CHP) and another with only power generation (Power), affected by diversion strategies of five waste fractions (fibres, plastic, metals, organics and glass), named "target fractions". The study assumed three possible responses to waste diversion in the WtE facilities: (i) biomass was added to maintain a constant thermal load, (ii) Refused-Derived-Fuel (RDF) was included to maintain a constant thermal load, or (iii) no reaction occurred resulting in a reduced waste throughput without full utilization of the facility capacity. Results demonstrated that marginal costs of diversion from WtE were up to eleven times larger than average costs and dependent on the response in the WtE plant. Marginal cost of diversion were between 39 and 287 € Mg(-1) target fraction when biomass was added in a CHP (from 34 to 303 € Mg(-1) target fraction in the only Power case), between -2 and 300 € Mg(-1) target fraction when RDF was added in a CHP (from -2 to 294 € Mg(-1) target fraction in the only Power case) and between 40 and 303 € Mg(-1) target fraction when no reaction happened in a CHP (from 35 to 296 € Mg(-1) target fraction in the only Power case). Although average costs at WtE facilities were highly influenced by energy selling prices, marginal costs were not (provided a response was initiated at the WtE to keep constant the utilized thermal capacity). Failing to systematically

  1. Time-Dependent Risk Estimation and Cost-Benefit Analysis for Mitigation Actions

    Science.gov (United States)

    van Stiphout, T.; Wiemer, S.; Marzocchi, W.

    2009-04-01

    Earthquakes strongly cluster in space and time. Consequently, the most dangerous time is right after a moderate earthquake has happened, because their is a ‘high' (i.e., 2-5 percent) probability that this event will be followed by a subsequent aftershock which happens to be as large or larger than the initiating event. The seismic hazard during this time-period exceeds the background probability significantly and by several orders of magnitude. Scientists have developed increasingly accurate forecast models that model this time-dependent hazard, and such models are currently being validated in prospective testing. However, this probabilistic information in the hazard space is difficult to digest for decision makers, the media and general public. Here, we introduce a possible bridge between seismology and decision makers (authorities, civil defense) by proposing a more objective way to estimate time-dependent risk assessment. Short Term Earthquake Risk assessment (STEER) combines aftershock hazard and loss assessments. We use site-specific information on site effects and building class distribution and combine this with existing loss models to compute site specific time-dependent risk curves (probability of exceedance for fatalities, injuries, damages etc). We show the effect of uncertainties in the different components using Monte Carlo Simulations of the input parameters. This time-dependent risk curves can act as a decision support. We extend the STEER approach by introducing a Cost-Benefit approach for certain mitigation actions after a medium-sized earthquake. Such Cost-Benefit approaches have been recently developed for volcanic risk assessment to rationalize precautionary evacuations in densely inhabitated areas threatened by volcanoes. Here we extend the concept to time-dependent probabilistic seismic risk assessment. For the Cost-Benefit analysis of mitigation actions we calculate the ratio between the cost for the mitigation actions and the cost of the

  2. Cost estimation of thermal and nuclear power using annual securities report

    International Nuclear Information System (INIS)

    Matsuo, Yuji; Nagatomi, Yu; Murakami, Tomoko

    2011-01-01

    Cost estimation of generation cost derived from various power sources was widely conducted using model plant or annual securities report of electric utilities. Although annual securities report method was subjected to some limitation in methodology itself, useful information was obtained for cost comparison of thermal and nuclear power. Studies on generation cost evaluation of thermal and nuclear power based on this method during past five years showed that nuclear power cost was almost stable 7 Yen/kWh and thermal power cost was varying 9 - 12 Yen/kWh dependent on violent fluctuations of primary energy cost. Nuclear power was expected cost increase due to enhanced safety requirements or damage compensation of accidents as well as decommissioning and back-end cost, which were difficult to evaluate accurately with annual securities report. Further comprehensive and accurate cost estimation should be encouraged including these items. (T. Tanaka)

  3. Cost estimation of the decommissioning of nuclear fuel cycle plants

    International Nuclear Information System (INIS)

    Barbe, A.; Pech, R.

    1991-01-01

    Most studies conducted to date on the cost of decommissioning nuclear facilities pertain to reactors. Few such studies have been performed on the cost of decommissioning nuclear fuel cycle plants, particularly spent fuel reprocessing plants. Present operators of these plants nevertheless need to assess such costs, at least in order to include the related expenses in their short-, medium- or long-term projections. They also need to determine now, for example, suitable production costs that the plant owners will have to propose to their customers. Unlike nuclear reactors for which a series effect is involved (PWRs, BWRs, etc.) and where radioactivity is relatively concentrated, industrial-scale reprocessing plants are large, complex installations for which decommissioning is a long and costly operation that requires a special approach. Faced with this problem, Cogema, the owner and operator of the La Hague and Marcoule reprocessing plants in France, called on SGN to assess the total decommissioning costs for its plants. This assessment led SGN to development by SGN engineers of a novel methodology and a computerized calculation model described below. The resulting methodology and model are applicable to other complex nuclear facilities besides reprocessing plants, such as laboratories and nuclear auxiliaries of reactor cores. (author)

  4. Venture Guidance Appraisal cost estimates for groundwater protection Environmental Impact Statement

    International Nuclear Information System (INIS)

    Moyer, R.A.

    1987-01-01

    Cost estimates were prepared for closure options at criteria waste sites and alternatives for new disposal facilities for hazardous wastes, mixed wastes, low level radioactive wastes and slurry from liquid waste treatment facilities. Because these cost estimates will be used in the Groundwater Protection EIS, the goal was to develop ''enveloping'' costs, i.e., the alternative or option chosen for execution at a later date should cost no more than the estimate. This report summarizes scenarios for making detailed cost estimates. Also included are unit costs for disposition of potential excavations, for operational activities, and for groundwater monitoring and site maintenance after closure of the site. The cost numbers presented are intended for study purposes only and not for budgetary activities

  5. Estimates and implications of the costs of compliance with biosafety regulations in developing countries.

    Science.gov (United States)

    Falck-Zepeda, Jose; Yorobe, Jose; Husin, Bahagiawati Amir; Manalo, Abraham; Lokollo, Erna; Ramon, Godfrey; Zambrano, Patricia; Sutrisno

    2012-01-01

    Estimating the cost of compliance with biosafety regulations is important as it helps developers focus their investments in producer development. We provide estimates for the cost of compliance for a set of technologies in Indonesia, the Philippines and other countries. These costs vary from US $100,000 to 1.7 million. These are estimates of regulatory costs and do not include product development or deployment costs. Cost estimates need to be compared with potential gains when the technology is introduced in these countries and the gains in knowledge accumulate during the biosafety assessment process. Although the cost of compliance is important, time delays and uncertainty are even more important and may have an adverse impact on innovations reaching farmers.

  6. Cost estimation in software engineering projects with web components development

    Directory of Open Access Journals (Sweden)

    Javier de Andrés

    2015-01-01

    Full Text Available Existen multitud de modelos propuestos para la predicción de co stes en proyectos de software, al gunos orientados específicamen te para proyectos Web. Este trabajo analiza si los modelos específicos para proyectos Web están justifi cados, examinando el comportami ento diferencial de los costes entre proyectos de desarrollo softwar e Web y no Web. Se analizan dos aspectos del cálculo de costes: las deseconomías de escala, y el im pacto de algunas características de estos proyectos que son utilizadas como cost drivers. Se en uncian dos hipótesis: (a en estos proyect os las deseconomías de escala so n mayores y (b el incremento de coste que provocan los cost dr ivers es menor para los proyectos Web. Se contrastaron estas hipótesis a nalizando un conjunto de proyectos reales. Los resultados sugie ren que ambas hipótesis se cumplen. Por lo tanto, la principal contribu ción a la literatura de esta inv estigación es que el desarrollo de modelos específicos para los proyectos Web está justificado.

  7. Estimation of small-scale hydroelectric power plant costs

    International Nuclear Information System (INIS)

    Santos, Afonso Henriques Moreira; Silva, Benedito Claudio da; Magalhaes, Ricardo Nogueira

    2010-01-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  8. Comparison of methods for estimating the cost of human immunodeficiency virus-testing interventions.

    Science.gov (United States)

    Shrestha, Ram K; Sansom, Stephanie L; Farnham, Paul G

    2012-01-01

    The Centers for Disease Control and Prevention (CDC), Division of HIV/AIDS Prevention, spends approximately 50% of its $325 million annual human immunodeficiency virus (HIV) prevention funds for HIV-testing services. An accurate estimate of the costs of HIV testing in various settings is essential for efficient allocation of HIV prevention resources. To assess the costs of HIV-testing interventions using different costing methods. We used the microcosting-direct measurement method to assess the costs of HIV-testing interventions in nonclinical settings, and we compared these results with those from 3 other costing methods: microcosting-staff allocation, where the labor cost was derived from the proportion of each staff person's time allocated to HIV testing interventions; gross costing, where the New York State Medicaid payment for HIV testing was used to estimate program costs, and program budget, where the program cost was assumed to be the total funding provided by Centers for Disease Control and Prevention. Total program cost, cost per person tested, and cost per person notified of new HIV diagnosis. The median costs per person notified of a new HIV diagnosis were $12 475, $15 018, $2697, and $20 144 based on microcosting-direct measurement, microcosting-staff allocation, gross costing, and program budget methods, respectively. Compared with the microcosting-direct measurement method, the cost was 78% lower with gross costing, and 20% and 61% higher using the microcosting-staff allocation and program budget methods, respectively. Our analysis showed that HIV-testing program cost estimates vary widely by costing methods. However, the choice of a particular costing method may depend on the research question being addressed. Although program budget and gross-costing methods may be attractive because of their simplicity, only the microcosting-direct measurement method can identify important determinants of the program costs and provide guidance to improve

  9. Moment Magnitude discussion in Austria

    Science.gov (United States)

    Weginger, Stefan; Jia, Yan; Hausmann, Helmut; Lenhardt, Wolfgang

    2017-04-01

    We implemented and tested the Moment Magnitude estimation „dbmw" from the University of Trieste in our Antelope near real-time System. It is used to get a fast Moment Magnitude solutions and Ground Motion Parameter (PGA, PGV, PSA 0.3, PSA 1.0 and PSA 3.0) to calculate Shake and Interactive maps. A Moment Magnitude Catalogue was generated and compared with the Austrian Earthquake Catalogue and all available Magnitude solution of the neighbouring agencies. Relations of Mw to Ml and Ground Motion to Intensity are presented.

  10. 48 CFR 252.215-7002 - Cost estimating system requirements.

    Science.gov (United States)

    2010-10-01

    ... contract awards. Estimating system includes the Contractor's— (1) Organizational structure; (2) Established... (e) of this clause apply if the Contractor is a large business and either— (1) In its fiscal year...

  11. First estimates of the potential cost and cost saving of protecting childhood hearing from damage caused by congenital CMV infection.

    Science.gov (United States)

    Williams, Eleri J; Gray, Joanne; Luck, Suzanne; Atkinson, Claire; Embleton, Nicholas D; Kadambari, Seilesh; Davis, Adrian; Griffiths, Paul; Sharland, Mike; Berrington, Janet E; Clark, Julia E

    2015-11-01

    Congenital cytomegalovirus (cCMV) is an important cause of childhood deafness, which is modifiable if diagnosed within the first month of life. Targeted screening of infants who do not pass their newborn hearing screening tests in England is a feasible approach to identify and treat cases to improve hearing outcome. To conduct a cost analysis of targeted screening and subsequent treatment for cCMV-related sensorineural hearing loss (SNHL) in an, otherwise, asymptomatic infant, from the perspective of the UK National Health Service (NHS). Using data from the newborn hearing screening programme (NHSP) in England and a recent study of targeted screening for cCMV using salivary swabs within the NHSP, we estimate the cost (in UK pounds (£)) to the NHS. The cost of screening (time, swabs and PCR), assessing, treating and following up cases is calculated. The cost per case of preventing hearing deterioration secondary to cCMV with targeted screening is calculated. The cost of identifying, assessing and treating a case of cCMV-related SNHL through targeted cCMV screening is estimated to be £6683. The cost of improving hearing outcome for an infant with cCMV-related SNHL through targeted screening and treatment is estimated at £14 202. The costs of targeted screening for cCMV using salivary swabs integrated within NHSP resulted in an estimate of cost per case that compares favourably with other screening programmes. This could be used in future studies to estimate the full economic value in terms of incremental costs and incremental health benefits. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  12. Computer software to estimate timber harvesting system production, cost, and revenue

    Science.gov (United States)

    Dr. John E. Baumgras; Dr. Chris B. LeDoux

    1992-01-01

    Large variations in timber harvesting cost and revenue can result from the differences between harvesting systems, the variable attributes of harvesting sites and timber stands, or changing product markets. Consequently, system and site specific estimates of production rates and costs are required to improve estimates of harvesting revenue. This paper describes...

  13. Estimating the costs associated with malnutrition in Dutch nursing homes.

    Science.gov (United States)

    Meijers, Judith M M; Halfens, Ruud J G; Wilson, Lisa; Schols, Jos M G A

    2012-02-01

    Malnutrition in western health care involves a tremendous burden of illness. In this study the economic implications of malnutrition in Dutch nursing homes are investigated as part of the Health and Economic Impact of Malnutrition in Europe Study from the European Nutrition for Health Alliance. A questionnaire was developed, focussing on the additional time and resources spent to execute all relevant nutritional activities in nursing home patients with at risk of malnutrition or malnourished. Results were extrapolated on national level, based on the prevalence rates gathered within the national Prevalence Measurement of Care Problems 2009. The normal nutritional costs are 319 million Euro per year. The total additional costs of managing the problem of malnutrition in Dutch nursing homes involve 279 million Euro per year and are related to extra efforts in nutritional screening, monitoring and treatment. The extra costs for managing nursing home residents at risk of malnutrition are 8000 euro per patient and 10000 euro for malnourished patients. The extra costs related to malnutrition are a considerable burden for the nursing home sector and urge for preventive measures. Crown Copyright © 2011. Published by Elsevier Ltd. All rights reserved.

  14. Guidelines for producing commercial nuclear power plant decommissioning cost estimates

    International Nuclear Information System (INIS)

    La Guardia, T.S.

    1986-01-01

    The guidelines are not intended to be a ''cookbook'' or a ''standard''. Their purpose is to ensure all decomissioning cost elements are properly included and to provide guidance on the detail required. Other methodologies may be used if they accomplish this objective

  15. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    consisted of five distinct types of contractors, general builders, civil engineers, electricians ... Mmboswobeni Watson Ladzani, Department of Business Management, University of South .... final cost of a proposed project for a given work scope. Thus, by .... Since the test statistic does not exceed the critical region, the null.

  16. A Probabilistic Cost Estimation Model for Unexploded Ordnance Removal

    Science.gov (United States)

    1999-09-01

    clearance of the former Fort Ord costly and difficult [Meuser, and Szasz 1997]. Finally, soil type affects the maximum depth that ordnance...Correlated Random Variables from partially-specified Distributions." Management Science. 44(1998): 203- 218. Meuser, M, and A. Szasz . "Stakeholder

  17. Estimated incremental costs for NRC licensees to implement the US/IAEA safeguards agreement

    International Nuclear Information System (INIS)

    Clark, R.G.; Brouns, R.J.; Chockie, A.D.; Davenport, L.C.; Merrill, J.A.

    1979-01-01

    A study was recently completed for the US Nuclear Regulatory Commision (NRC) by the Pacific Northwest Laboratory (PNL) to identify the incremental cost of implementing the US/IAEA safeguards treaty agreement to eligible NRC licensees. Sources for the study were cost estimates from several licensees who will be affected by the agreement and cost analyses by PNL staff. The initial cost to all eligible licensees to implement the agreement is estimated by PNL to range from $1.9 to $7.2 million. The annual cost to these same licensees for the required accounting and reporting activities is estimated at $0.5 to $1.5 million. Annual inspection costs to the industry for the limited IAEA inspection being assumed is estimated at $80,000 to $160,000

  18. Implementation of the ANNs ensembles in macro-BIM cost estimates of buildings' floor structural frames

    Science.gov (United States)

    Juszczyk, Michał

    2018-04-01

    This paper reports some results of the studies on the use of artificial intelligence tools for the purposes of cost estimation based on building information models. A problem of the cost estimates based on the building information models on a macro level supported by the ensembles of artificial neural networks is concisely discussed. In the course of the research a regression model has been built for the purposes of cost estimation of buildings' floor structural frames, as higher level elements. Building information models are supposed to serve as a repository of data used for the purposes of cost estimation. The core of the model is the ensemble of neural networks. The developed model allows the prediction of cost estimates with satisfactory accuracy.

  19. BIM – New rules of measurement ontology for construction cost estimation

    Directory of Open Access Journals (Sweden)

    F.H. Abanda

    2017-04-01

    Full Text Available For generations, the process of cost estimation has been manual, time-consuming and error-prone. Emerging Building Information Modelling (BIM can exploit standard measurement methods to automate cost estimation process and improve inaccuracies. Structuring standard measurement methods in an ontologically and machine readable format for a BIM software can greatly facilitate the process of improving inaccuracies in cost estimation. This study explores the development of an ontology based on New Rules of Measurement (NRM for cost estimation during the tendering stages. The methodology adopted is methontology, one of the most widely used ontology engineering methodologies. To ensure the ontology is fit for purpose, cost estimation experts are employed to check the semantics, descriptive logic-based reasoners are used to syntactically check the ontology and a leading 4D BIM modelling software is used on a case study building to test/validate the proposed ontology.

  20. Estimating Resource Costs of Levy Campaigns in Five Ohio School Districts

    Science.gov (United States)

    Ingle, W. Kyle; Petroff, Ruth Ann; Johnson, Paul A.

    2011-01-01

    Using Levin and McEwan's (2001) "ingredients method," this study identified the major activities and associated costs of school levy campaigns in five districts. The ingredients were divided into one of five cost categories--human resources, facilities, fees, marketing, and supplies. As to overall costs of the campaigns, estimates ranged…

  1. Estimating the costs of intensity-modulated and 3-dimensional conformal radiotherapy in Ontario.

    Science.gov (United States)

    Yong, J H E; McGowan, T; Redmond-Misner, R; Beca, J; Warde, P; Gutierrez, E; Hoch, J S

    2016-06-01

    Radiotherapy is a common treatment for many cancers, but up-to-date estimates of the costs of radiotherapy are lacking. In the present study, we estimated the unit costs of intensity-modulated radiotherapy (imrt) and 3-dimensional conformal radiotherapy (3D-crt) in Ontario. An activity-based costing model was developed to estimate the costs of imrt and 3D-crt in prostate cancer. It included the costs of equipment, staff, and supporting infrastructure. The framework was subsequently adapted to estimate the costs of radiotherapy in breast cancer and head-and-neck cancer. We also tested various scenarios by varying the program maturity and the use of volumetric modulated arc therapy (vmat) alongside imrt. From the perspective of the health care system, treating prostate cancer with imrt and 3D-crt respectively cost $12,834 and $12,453 per patient. The cost of radiotherapy ranged from $5,270 to $14,155 and was sensitive to analytic perspective, radiation technique, and disease site. Cases of head-and-neck cancer were the most costly, being driven by treatment complexity and fractions per treatment. Although imrt was more costly than 3D-crt, its cost will likely decline over time as programs mature and vmat is incorporated. Our costing model can be modified to estimate the costs of 3D-crt and imrt for various disease sites and settings. The results demonstrate the important role of capital costs in studies of radiotherapy cost from a health system perspective, which our model can accommodate. In addition, our study established the need for future analyses of imrt cost to consider how vmat affects time consumption.

  2. Nuclear generating station and heavy water plant cost estimates for strategy studies

    International Nuclear Information System (INIS)

    Archinoff, G.H.

    1979-07-01

    Nuclear generating station capital, operating and maintenance costs are basic input data for strategy analyses of alternate nuclear fuel cycles. This report presents estimates of these costs for natural uranium CANDU stations, CANDU stations operating on advanced fuel cycles, and liquid metal fast breeder reactors. Cost estimates for heavy water plants are also presented. The results show that station capital costs for advanced fuel cycles are not expected to be significantly greater than those for natural uranium stations. LMFBR capital costs are expected to be 25-30 percent greater than for CANDU's. (auth)

  3. Molten Salt: Concept Definition and Capital Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, Larry [Black & Veatch, Kansas City, MO (United States); Andrew, Daniel [Black & Veatch, Kansas City, MO (United States); Adams, Shannon [Black & Veatch, Kansas City, MO (United States); Galluzzo, Geoff [Black & Veatch, Kansas City, MO (United States)

    2016-06-30

    The Department of Energy’s (DOE’s) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO has a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and to reduce costs 30 percent further by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO2 (sCO2) cycles. DOE retained Black & Veatch to support SETO’s SunShot Initiative for CSP solar power tower technology in the following areas: 1. Concept definition, including costs and schedule, of a flexible test facility to be used to test and prove components in part to support financing. 2. Concept definition, including costs and schedule, of an integrated high temperature molten salt (MS) facility with thermal energy storage and with a supercritical CO2 cycle generating approximately 10MWe. 3. Concept definition, including costs and schedule, of an integrated high temperature falling particle facility with thermal energy storage and with a supercritical CO2

  4. Commercial Vessel Safety. Economic Costs. Appendix A. Estimation Procedures for Costs and Cost Impacts of Marine Safety Regulations.

    Science.gov (United States)

    1979-12-01

    Subsistence: Includes the cost of all edibles , sales taxes, delivery charges, and loading costs. Stores, Supplies, and Equipment: The cost of all...consumable stores, supplies, and expendable equipment other than edibles , fuel, and water. 89 Insurance: Annual cost for H&M, P&I, and port risk for the...Products (50) 3441 3442 3444 3446 3449 105 Screw Machine Products (51) 3450 106 Metal Stampings (51) 3460 107 Cutlery , Hand Tools, Hardware (52) 3420

  5. Estimated costs of advanced lung cancer care in a public reference hospital.

    Science.gov (United States)

    Knust, Renata Erthal; Portela, Margareth Crisóstomo; Pereira, Claudia Cristina de Aguiar; Fortes, Guilherme Bastos

    2017-08-17

    To estimate the direct medical costs of advanced non-small cell lung cancer care. We assessed a cohort of 277 patients treated in the Brazilian National Cancer Institute in 2011. The costs were estimated from the perspective of the hospital as a service provider of reference for the Brazilian Unified Health System. The materials and procedures used were identified and quantified, per patient, and we assigned to them monetary values, consolidated in phases of the assistance defined. The analyses had a descriptive character with costs in Real (R$). Overall, the cohort represented a cost of R$2,473,559.91, being 71.5% related to outpatient care and 28.5% to hospitalizations. In the outpatient care, costs with radiotherapy (34%) and chemotherapy (22%) predominated. The results pointed to lower costs in the initial phase of treatment (7.2%) and very high costs in the maintenance phase (61.6%). Finally, we identified statistically significant differences of average cost by age groups, education levels, physical performance, and histological type. This study provides a current, useful, and relevant picture of the costs of patients with non-small cell lung cancer treated in a public hospital of reference and it provides information on the magnitude of the problem of cancer in the context of public health. The results confirm the importance of radiation treatment and hospitalizations as the main components of the cost of treatment. Despite some losses of follow-up, we assess that, for approximately 80% of the patients included in the study, the estimates presented herein are satisfactory for the care of the disease, from the perspective of a service provider of reference of the Brazilian Unified Health System, as it provides elements for the management of the service, as well as for studies that result in more rational forms of resource allocation. Estimar os custos médicos diretos da assistência ao câncer de pulmão não pequenas células avançado. Foi avaliada uma

  6. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  7. Falling Particles: Concept Definition and Capital Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, Larry [Black & Veatch, Kansas City, MO (United States); Galluzzo, Geoff [Black & Veatch, Kansas City, MO (United States); Adams, Shannon [Black & Veatch, Kansas City, MO (United States); Andrew, Daniel [Black & Veatch, Kansas City, MO (United States)

    2016-06-30

    The Department of Energy’s (DOE) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO has a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and to reduce costs 30 percent further by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO2 (sCO2) cycles.

  8. Estimating the cost of epilepsy in Europe: a review with economic modeling.

    Science.gov (United States)

    Pugliatti, Maura; Beghi, Ettore; Forsgren, Lars; Ekman, Mattias; Sobocki, Patrik

    2007-12-01

    Based on available epidemiologic, health economic, and international population statistics literature, the cost of epilepsy in Europe was estimated. Europe was defined as the 25 European Union member countries, Iceland, Norway, and Switzerland. Guidelines for epidemiological studies on epilepsy were used for a case definition. A bottom-up prevalence-based cost-of-illness approach, the societal perspective for including the cost items, and the human capital approach as valuation principle for indirect costs were used. The cost estimates were based on selected studies with common methodology and valuation principles. The estimated prevalence of epilepsy in Europe in 2004 was 4.3-7.8 per 1,000. The estimated total cost of the disease in Europe was euro15.5 billion in 2004, indirect cost being the single most dominant cost category (euro8.6 billion). Direct health care costs were euro2.8 billion, outpatient care comprising the largest part (euro1.3 billion). Direct nonmedical cost was euro4.2 billion. That of antiepileptic drugs was euro400 million. The total cost per case was euro2,000-11,500 and the estimated cost per European inhabitant was euro33. Epilepsy is a relevant socioeconomic burden at individual, family, health services, and societal level in Europe. The greater proportion of such burden is outside the formal health care sector, antiepileptic drugs representing a smaller proportion. Lack of economic data from several European countries and other methodological limitations make this report an initial estimate of the cost of epilepsy in Europe. Prospective incidence cost-of-illness studies from well-defined populations and common methodology are encouraged.

  9. Using Parametric Cost Models to Estimate Engineering and Installation Costs of Selected Electronic Communications Systems

    Science.gov (United States)

    1994-09-01

    NC: SAS Institute Inc., 1991. 2. Horngren , Charles T. And George Foster. Cost Accounting : A Managerial Emphasis. Englewood Cliffs, New Jersey...34 Office of the DoD Comptroller, Washington DC. 20. Horngren , Charles T. And George Foster. Cost Accounting : A Managerial Emphasis. Englewood Cliffs NJ...establish revolving funds as a means to more effectively control the cost of work performed by DoD support activities. In the 1950’ s and 1960’ s

  10. Innovation in the pharmaceutical industry: New estimates of R&D costs.

    Science.gov (United States)

    DiMasi, Joseph A; Grabowski, Henry G; Hansen, Ronald W

    2016-05-01

    The research and development costs of 106 randomly selected new drugs were obtained from a survey of 10 pharmaceutical firms. These data were used to estimate the average pre-tax cost of new drug and biologics development. The costs of compounds abandoned during testing were linked to the costs of compounds that obtained marketing approval. The estimated average out-of-pocket cost per approved new compound is $1395 million (2013 dollars). Capitalizing out-of-pocket costs to the point of marketing approval at a real discount rate of 10.5% yields a total pre-approval cost estimate of $2558 million (2013 dollars). When compared to the results of the previous study in this series, total capitalized costs were shown to have increased at an annual rate of 8.5% above general price inflation. Adding an estimate of post-approval R&D costs increases the cost estimate to $2870 million (2013 dollars). Copyright © 2016 Elsevier B.V. All rights reserved.

  11. Estimating the cost of healthcare delivery in three hospitals in southern ghana.

    Science.gov (United States)

    Aboagye, A Q Q; Degboe, A N K; Obuobi, A A D

    2010-09-01

    The cost burden (called full cost) of providing health services at a referral, a district and a mission hospital in Ghana were determined. Standard cost-finding and cost analysis tools recommended by World Health Organization are used to analyse 2002 and 2003 hospital data. Full cost centre costs were computed by taking into account cash and non-cash expenses and allocating overhead costs to intermediate and final patient care centres. The full costs of running the mission hospital in 2002 and 2003 were US$600,295 and US$758,647 respectively; for the district hospital, the respective costs were US$496,240 and US$487,537; and for the referral hospital, the respective costs were US$1,160,535 and US$1,394,321. Of these, overhead costs ranged between 20% and 42%, while salaries made up between 45% and 60%. Based on healthcare utilization data, in 2003 the estimated cost per outpatient attendance was US$ 2.25 at the mission hospital, US$ 4.51 at the district hospital and US$8.5 at the referral hospital; inpatient day costs were US$ 6.05, US$ 9.95 and US$18.8 at the respective hospitals. User fees charged at service delivery points were generally below cost. However, some service delivery points have the potential to recover their costs. Salaries are the major cost component of the three hospitals. Overhead costs constitute an important part of hospital costs and must be noted in efforts to recover costs. Cost structures are different at different types of hospitals. Unit costs at service delivery points can be estimated and projected into the future.

  12. 2002 IDA Cost Research Symposium: Estimating the Costs of Transforming U.S. Military Forces

    Science.gov (United States)

    2002-08-01

    Missile Database Improvements • ACEIT Enhancements VIII-5 6I n t e g r i t y - S e r v i c e - E x c e l l e n c e Capability to Cost...systems • Expand CERs • Create interface to download to CO$STAT for CER development • Extract CERs and move them into ACEIT • Supports: Conventional...Cost Model MDA–5 Integrating MDA Cost Risk Model with ACEIT MDA–6 Target Common Cost Model MDA–7 Deployable Optics Development and Manufacturing MDA

  13. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  14. Estimating Power Outage Cost based on a Survey for Industrial Customers

    Science.gov (United States)

    Yoshida, Yoshikuni; Matsuhashi, Ryuji

    A survey was conducted on power outage cost for industrial customers. 5139 factories, which are designated energy management factories in Japan, answered their power consumption and the loss of production value due to the power outage in an hour in summer weekday. The median of unit cost of power outage of whole sectors is estimated as 672 yen/kWh. The sector of services for amusement and hobbies and the sector of manufacture of information and communication electronics equipment relatively have higher unit cost of power outage. Direct damage cost from power outage in whole sectors reaches 77 billion yen. Then utilizing input-output analysis, we estimated indirect damage cost that is caused by the repercussion of production halt. Indirect damage cost in whole sectors reaches 91 billion yen. The sector of wholesale and retail trade has the largest direct damage cost. The sector of manufacture of transportation equipment has the largest indirect damage cost.

  15. Top-down and bottom-up approaches for cost estimating new reactor designs

    International Nuclear Information System (INIS)

    Berbey, P.; Gautier, G.M.; Duflo, D.; Rouyer, J.L.

    2007-01-01

    For several years, Generation-4 designs will be 'pre-conceptual' for the less mature concepts and 'preliminary' for the more mature concepts. In this situation, appropriate data for some of the plant systems may be lacking to develop a bottom-up cost estimate. Therefore, a more global approach, the Top-Down Approach (TDA), is needed to help the designers and decision makers in comparing design options. It utilizes more or less simple models for cost estimating the different parts of a design. TDA cost estimating effort applies to a whole functional element whose cost is approached by similar estimations coming from existing data, ratios and models, for a given range of variation of parameters. Modeling is used when direct analogy is not possible. There are two types of models, global and specific ones. Global models are applied to cost modules related to Code Of Account. Exponential formulae such as Ci = Ai + (Bi x Pi n ) are used when there are cost data for comparable modules in nuclear or other industries. Specific cost models are developed for major specific components of the plant: - process equipment such as reactor vessel, steam generators or large heat exchangers. - buildings, with formulae estimating the construction cost from base cost of m3 of building volume. - systems, when unit costs, cost ratios and models are used, depending on the level of detail of the design. Bottom Up Approach (BUA), which is based on unit prices coming from similar equipment or from manufacturer consulting, is very valuable and gives better cost estimations than TDA when it can be applied, that is at a rather late stage of the design. Both approaches are complementary when some parts of the design are detailed enough to be estimated by BUA, and when BUA results are used to check TDA results and to improve TDA models. This methodology is applied to the HTR (High Temperature Reactor) concept and to an advanced PWR design

  16. Cost Estimation Techniques for C3I System Software.

    Science.gov (United States)

    1984-07-01

    opment manmonth have been determined for maxi, midi , and mini .1 type computers. Small to median size timeshared developments used 0.2 to 1.5 hours...development schedule 1.23 1.00 1.10 2.1.3 Detailed Model The final codification of the COCOMO regressions was the development of separate effort...regardless of the software structure level being estimated: D8VC -- the expected development computer (maxi. midi . mini, micro) MODE -- the expected

  17. Cost Performance Estimating Relationships for Hybrid Electric Vehicle Components

    Science.gov (United States)

    2003-07-31

    Permanent magnet motors are more likely to be used as generators, while AC induction motors are more efficiently used as motors. Inverters/controllers can...than permanent magnet motors . Switched Reluctance motors are also used on hybrid electric vehicles, but are not used as widely as either AC...induction or permanent magnet motors , and are not analyzed here. Methodology The motor estimates are based on power, with kilowatts being the unit of

  18. The cost of obesity for nonbariatric inpatient operative procedures in the United States: national cost estimates obese versus nonobese patients.

    Science.gov (United States)

    Mason, Rodney J; Moroney, Jolene R; Berne, Thomas V

    2013-10-01

    To evaluate the economic impact of obesity on hospital costs associated with the commonest nonbariatric, nonobstetrical surgical procedures. Health care costs and obesity are both rising. Nonsurgical costs associated with obesity are well documented but surgical costs are not. National cost estimates were calculated from the Healthcare Cost and Utilization Project (HCUP) Nationwide Inpatient Sample (NIS) database, 2005-2009, for the highest volume nonbariatric nonobstetric procedures. Obesity was identified from the HCUP-NIS severity data file comorbidity index. Costs for obese patients were compared with those for nonobese patients. To control for medical complexity, each obese patient was matched one-to-one with a nonobese patient using age, sex, race, and 28 comorbid defined elements. Of 2,309,699 procedures, 439,8129 (19%) were successfully matched into 2 medically equal groups (obese vs nonobese). Adjusted total hospital costs incurred by obese patients were 3.7% higher with a significantly (P cost of $648 (95% confidence interval [CI]: $556-$736) compared with nonobese patients. Of the 2 major components of hospital costs, length of stay was significantly increased in obese patients (mean difference = 0.0253 days, 95% CI: 0.0225-0.0282) and resource utilization determined by costs per day were greater in obese patients due to an increased number of diagnostic and therapeutic procedures needed postoperatively (odds ratio [OR] = 0.94, 95% CI: 0.93-0.96). Postoperative complications were equivalent in both groups (OR = 0.97, 95% CI: 0.93-1.02). Annual national hospital expenditures for the largest volume surgical procedures is an estimated $160 million higher in obese than in a comparative group of nonobese patients.

  19. Capital and operating cost estimates for high temperature superconducting magnetic energy storage

    International Nuclear Information System (INIS)

    Schoenung, S.M.; Meier, W.R.; Fagaly, R.L.; Heiberger, M.; Stephens, R.B.; Leuer, J.A.; Guzman, R.A.

    1992-01-01

    Capital and operating costs have been estimated for mid-scale (2 to 200 Mwh) superconducting magnetic energy storage (SMES) designed to use high temperature superconductors (HTS). Capital costs are dominated by the cost of superconducting materials. Operating costs, primarily for regeneration, are significantly reduced for HTS-SMES in comparison to low temperature, conventional systems. This cost component is small compared to other O and M and capital components, when levelized annual costs are projected. In this paper, the developments required for HTS-SMES feasibility are discussed

  20. Accounting for the relationship between per diem cost and LOS when estimating hospitalization costs.

    Science.gov (United States)

    Ishak, K Jack; Stolar, Marilyn; Hu, Ming-yi; Alvarez, Piedad; Wang, Yamei; Getsios, Denis; Williams, Gregory C

    2012-12-01

    Hospitalization costs in clinical trials are typically derived by multiplying the length of stay (LOS) by an average per-diem (PD) cost from external sources. This assumes that PD costs are independent of LOS. Resource utilization in early days of the stay is usually more intense, however, and thus, the PD cost for a short hospitalization may be higher than for longer stays. The shape of this relationship is unlikely to be linear, as PD costs would be expected to gradually plateau. This paper describes how to model the relationship between PD cost and LOS using flexible statistical modelling techniques. An example based on a clinical study of clevidipine for the treatment of peri-operative hypertension during hospitalizations for cardiac surgery is used to illustrate how inferences about cost-savings associated with good blood pressure (BP) control during the stay can be affected by the approach used to derive hospitalization costs.Data on the cost and LOS of hospitalizations for coronary artery bypass grafting (CABG) from the Massachusetts Acute Hospital Case Mix Database (the MA Case Mix Database) were analyzed to link LOS to PD cost, factoring in complications that may have occurred during the hospitalization or post-discharge. The shape of the relationship between LOS and PD costs in the MA Case Mix was explored graphically in a regression framework. A series of statistical models including those based on simple logarithmic transformation of LOS to more flexible models using LOcally wEighted Scatterplot Smoothing (LOESS) techniques were considered. A final model was selected, using simplicity and parsimony as guiding principles in addition traditional fit statistics (like Akaike's Information Criterion, or AIC). This mapping was applied in ECLIPSE to predict an LOS-specific PD cost, and then a total cost of hospitalization. These were then compared for patients who had good vs. poor peri-operative blood-pressure control. The MA Case Mix dataset included data

  1. Accounting for the relationship between per diem cost and LOS when estimating hospitalization costs

    Directory of Open Access Journals (Sweden)

    Ishak K

    2012-12-01

    Full Text Available Abstract Background Hospitalization costs in clinical trials are typically derived by multiplying the length of stay (LOS by an average per-diem (PD cost from external sources. This assumes that PD costs are independent of LOS. Resource utilization in early days of the stay is usually more intense, however, and thus, the PD cost for a short hospitalization may be higher than for longer stays. The shape of this relationship is unlikely to be linear, as PD costs would be expected to gradually plateau. This paper describes how to model the relationship between PD cost and LOS using flexible statistical modelling techniques. Methods An example based on a clinical study of clevidipine for the treatment of peri-operative hypertension during hospitalizations for cardiac surgery is used to illustrate how inferences about cost-savings associated with good blood pressure (BP control during the stay can be affected by the approach used to derive hospitalization costs. Data on the cost and LOS of hospitalizations for coronary artery bypass grafting (CABG from the Massachusetts Acute Hospital Case Mix Database (the MA Case Mix Database were analyzed to link LOS to PD cost, factoring in complications that may have occurred during the hospitalization or post-discharge. The shape of the relationship between LOS and PD costs in the MA Case Mix was explored graphically in a regression framework. A series of statistical models including those based on simple logarithmic transformation of LOS to more flexible models using LOcally wEighted Scatterplot Smoothing (LOESS techniques were considered. A final model was selected, using simplicity and parsimony as guiding principles in addition traditional fit statistics (like Akaike’s Information Criterion, or AIC. This mapping was applied in ECLIPSE to predict an LOS-specific PD cost, and then a total cost of hospitalization. These were then compared for patients who had good vs. poor peri-operative blood

  2. The Hospitalization Costs of Diabetes and Hypertension Complications in Zimbabwe: Estimations and Correlations

    Directory of Open Access Journals (Sweden)

    Mutsa P. Mutowo

    2016-01-01

    Full Text Available Objective. Treating complications associated with diabetes and hypertension imposes significant costs on health care systems. This study estimated the hospitalization costs for inpatients in a public hospital in Zimbabwe. Methods. The study was retrospective and utilized secondary data from medical records. Total hospitalization costs were estimated using generalized linear models. Results. The median cost and interquartile range (IQR for patients with diabetes, $994 (385–1553 mean $1319 (95% CI: 981–1657, was higher than patients with hypertension, $759 (494–1147 mean $914 (95% CI: 825–1003. Female patients aged below 65 years with diabetes had the highest estimated mean costs ($1467 (95% CI: 1177–1828. Wound care had the highest estimated mean cost of all procedures, $2884 (95% CI: 2004–4149 for patients with diabetes and $2239 (95% CI: 1589–3156 for patients with hypertension. Age below 65 years, medical procedures (amputation, wound care, dialysis, and physiotherapy, the presence of two or more comorbidities, and being prescribed two or more drugs were associated with significantly higher hospitalization costs. Conclusion. Our estimated costs could be used to evaluate and improve current inpatient treatment and management of patients with diabetes and hypertension and determine the most cost-effective interventions to prevent complications and comorbidities.

  3. Survey of State-Level Cost and Benefit Estimates of Renewable Portfolio Standards

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, J.; Barbose, G.; Bird, L.; Weaver, S.; Flores-Espino, F.; Kuskova-Burns, K.; Wiser, R.

    2014-05-01

    Most renewable portfolio standards (RPS) have five or more years of implementation experience, enabling an assessment of their costs and benefits. Understanding RPS costs and benefits is essential for policymakers evaluating existing RPS policies, assessing the need for modifications, and considering new policies. This study provides an overview of methods used to estimate RPS compliance costs and benefits, based on available data and estimates issued by utilities and regulators. Over the 2010-2012 period, average incremental RPS compliance costs in the United States were equivalent to 0.8% of retail electricity rates, although substantial variation exists around this average, both from year-to-year and across states. The methods used by utilities and regulators to estimate incremental compliance costs vary considerably from state to state and a number of states are currently engaged in processes to refine and standardize their approaches to RPS cost calculation. The report finds that state assessments of RPS benefits have most commonly attempted to quantitatively assess avoided emissions and human health benefits, economic development impacts, and wholesale electricity price savings. Compared to the summary of RPS costs, the summary of RPS benefits is more limited, as relatively few states have undertaken detailed benefits estimates, and then only for a few types of potential policy impacts. In some cases, the same impacts may be captured in the assessment of incremental costs. For these reasons, and because methodologies and level of rigor vary widely, direct comparisons between the estimates of benefits and costs are challenging.

  4. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  5. Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars

    Science.gov (United States)

    Hunt, Charles D.; vanPelt, Michel O.

    2004-01-01

    To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level

  6. Cost estimates for Operation Desert Shield/Desert Storm: a budgetary analysis

    OpenAIRE

    Johnson, J. Andrew.

    1991-01-01

    Operation Desert Shield/Desert Storm (DS/DS) presented unique challenges for estimating the cost of that conflict. This analysis reviews the cost estimates and methodologies developed for that purpose by DoD, CBO and GAO. It considers the budget climate and the role of foreign cash and in-kind contributions. Finally, it reviews the budgeting innovations used to provide and monitor DS/DS defense spending. At the outset of the crisis, costs were estimated to determine the defense funding requir...

  7. An Evaluation of the Automated Cost Estimating Integrated Tools (ACEIT) System

    Science.gov (United States)

    1989-09-01

    C~4p DTIC S ELECTE fl JAN12 19 .1R ~OF S%. B -U AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Caroline L...Ohio go 91 022 AFIT/GCA/LSQ/89S-5 AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Caroline L. Hanson Major, USAF...Department of Defense. AFIT/GCA/LSQ/89S-5 AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Presented to the

  8. Hospital costs estimation and prediction as a function of patient and admission characteristics.

    Science.gov (United States)

    Ramiarina, Robert; Almeida, Renan Mvr; Pereira, Wagner Ca

    2008-01-01

    The present work analyzed the association between hospital costs and patient admission characteristics in a general public hospital in the city of Rio de Janeiro, Brazil. The unit costs method was used to estimate inpatient day costs associated to specific hospital clinics. With this aim, three "cost centers" were defined in order to group direct and indirect expenses pertaining to the clinics. After the costs were estimated, a standard linear regression model was developed for correlating cost units and their putative predictors (the patients gender and age, the admission type (urgency/elective), ICU admission (yes/no), blood transfusion (yes/no), the admission outcome (death/no death), the complexity of the medical procedures performed, and a risk-adjustment index). Data were collected for 3100 patients, January 2001-January 2003. Average inpatient costs across clinics ranged from (US$) 1135 [Orthopedics] to 3101 [Cardiology]. Costs increased according to increases in the risk-adjustment index in all clinics, and the index was statistically significant in all clinics except Urology, General surgery, and Clinical medicine. The occupation rate was inversely correlated to costs, and age had no association with costs. The (adjusted) per cent of explained variance varied between 36.3% [Clinical medicine] and 55.1% [Thoracic surgery clinic]. The estimates are an important step towards the standardization of hospital costs calculation, especially for countries that lack formal hospital accounting systems.

  9. Methods for developing useful estimates of the costs associated with birth defects.

    Science.gov (United States)

    Case, Amy P; Canfield, Mark A

    2009-11-01

    Cost estimates for birth defects are useful to policy makers in deciding the best use of resources to prevent these conditions. Much of the effort in this area has focused on spina bifida, in part because cost savings can be estimated from folic acid-preventable cases. However, comprehensive cost-of-illness estimates for this condition may be too outdated, too general, or not applicable to individual states' environments. Using the live birth prevalence for spina bifida in Texas, we applied recent spina bifida cost estimates to approximate total lifetime medical and other costs for an average live birth cohort of spina bifida cases in Texas. In addition, we queried various government programs that provide services for persons with spina bifida to provide program-specific annual costs for this condition. Applying a recently published average lifetime medical cost of $635,000 per case of spina bifida to the average annual birth cohort of 120 Texas cases, an estimated $76 million in direct and indirect medical and other costs will be incurred in Texas over the life span of that cohort. Examples of estimated medical costs for one year are $5 million for infants using actual employer-paid insurance claims data and $6 million combined for children in two public sector programs. Stakeholders and state policy makers may look to state birth defects registries for useful cost data. Although comprehensive state-specific figures are not available, applying prevalence data to existing estimates and obtaining actual claims and program expenditures may help close this information gap.

  10. A level playing field-obtaining consistent cost estimates for advanced reactor designs

    International Nuclear Information System (INIS)

    Hudson, C.R.; Rohm, H.H.; Humphreys, J.R.

    1987-01-01

    A level playing field in sports is necessary to avoid a situation in which a team has an unfair advantage over its competition. Similarly, rules and guidelines for developing cost estimates can be established which, in effect, provide a level playing field whereby cost estimates for advanced power plant concepts can be presented on a consistent and equitable basis. As an example, consider the capital costs shown in Table 1. Both sets of cost are for the exact same power plant; Estimate 1 is expressed in constant dollars while Estimate 2 is presented in nominal or as-spent dollars. As shown, the costs in Table 1 are not directly comparable. Similar problems can be introduced as a result of differing assumptions in any number of parameters including the scope of the cost estimate, inflation/escalation and interest rates, contingency costs, and site location. Of course, the motivation for having consistent cost estimates is to permit comparison among various concepts. As the U.S. Department of Energy sponsors research and development work on several advanced reactor concepts in which expected cost is a key evaluation parameter, the emphasis in this particular endeavor has been in promoting the comparability of advanced reactor cost estimates among themselves and to existing power plant types. To continue with the analogy, the idea is to lay out the playing field and the rules of the contest such that each team participates in the match on an equal basis with the final score being solely determined by the inherent strengths and abilities of the teams. A description of the playing field and some of the more important rules will now be provided

  11. Technology Cost and Schedule Estimation (TCASE) Final Report

    Science.gov (United States)

    Wallace, Jon; Schaffer, Mark

    2015-01-01

    During the 2014-2015 project year, the focus of the TCASE project has shifted from collection of historical data from many sources to securing a data pipeline between TCASE and NASA's widely used TechPort system. TCASE v1.0 implements a data import solution that was achievable within the project scope, while still providing the basis for a long-term ability to keep TCASE in sync with TechPort. Conclusion: TCASE data quantity is adequate and the established data pipeline will enable future growth. Data quality is now highly dependent the quality of data in TechPort. Recommendation: Technology development organizations within NASA should continue to work closely with project/program data tracking and archiving efforts (e.g. TechPort) to ensure that the right data is being captured at the appropriate quality level. TCASE would greatly benefit, for example, if project cost/budget information was included in TechPort in the future.

  12. Counting the cost: estimating the economic benefit of pedophile treatment programs.

    Science.gov (United States)

    Shanahan, M; Donato, R

    2001-04-01

    The principal objective of this paper is to identify the economic costs and benefits of pedophile treatment programs incorporating both the tangible and intangible cost of sexual abuse to victims. Cost estimates of cognitive behavioral therapy programs in Australian prisons are compared against the tangible and intangible costs to victims of being sexually abused. Estimates are prepared that take into account a number of problematic issues. These include the range of possible recidivism rates for treatment programs; the uncertainty surrounding the number of child sexual molestation offences committed by recidivists; and the methodological problems associated with estimating the intangible costs of sexual abuse on victims. Despite the variation in parameter estimates that impact on the cost-benefit analysis of pedophile treatment programs, it is found that potential range of economic costs from child sexual abuse are substantial and the economic benefits to be derived from appropriate and effective treatment programs are high. Based on a reasonable set of parameter estimates, in-prison, cognitive therapy treatment programs for pedophiles are likely to be of net benefit to society. Despite this, a critical area of future research must include further methodological developments in estimating the quantitative impact of child sexual abuse in the community.

  13. The Magnitude of Mortality from Ischemic Heart Disease Attributed to Occupational Factors in Korea - Attributable Fraction Estimation Using Meta-analysis

    Directory of Open Access Journals (Sweden)

    Jaehyeok Ha

    2011-03-01

    Conclusion: We estimated occupational IHD mortality of Korea with updated data and more relevant evidence. Despite the efforts to obtain reliable estimates, there were many assumptions and limitations that must be overcome. Future research based on more precise design and reliable evidence is required for more accurate estimates.

  14. Statistical significant change versus relevant or important change in (quasi) experimental design : some conceptual and methodological problems in estimating magnitude of intervention-related change in health services research

    NARCIS (Netherlands)

    Middel, Berrie; van Sonderen, Eric

    2002-01-01

    This paper aims to identify problems in estimating and the interpretation of the magnitude of intervention-related change over time or responsiveness assessed with health outcome measures. Responsiveness is a problematic construct and there is no consensus on how to quantify the appropriate index to

  15. Estimation of the cost of large-scale school deworming programmes with benzimidazoles.

    Science.gov (United States)

    Montresor, A; Gabrielli, A F; Diarra, A; Engels, D

    2010-02-01

    This study estimates the cost of distributing benzimidazole tablets in the context of school deworming programmes: we analysed studies reporting the cost of school deworming from seven countries in four WHO regions. The estimated cost for drug procurement to cover one million children (including customs clearance and international transport) is approximately US$20000. The estimated financial costs (including the cost of training of personnel, drug transport, social mobilization and monitoring) is, on average, equivalent to US$33000 per million school-age children with minimal variation in different countries and continents. The estimated economic costs of distribution (including the time spent by teachers, and health personnel at central, provincial and district level) to cover one million children approximately corresponds to US$19000. This study shows the minimal cost of school deworming activities, but also shows the significant contribution (corresponding to a quarter of the entire cost of the programme) provided by health and education systems in endemic countries even in the case of drug donations and donor support of distribution costs. Copyright 2009 Royal Society of Tropical Medicine and Hygiene. Published by Elsevier Ltd. All rights reserved.

  16. Estimation of the cost of large-scale school deworming programmes with benzimidazoles

    Science.gov (United States)

    Montresor, A.; Gabrielli, A.F.; Engels, D.

    2017-01-01

    Summary This study estimates the cost of distributing benzimidazole tablets in the context of school deworming programmes: we analysed studies reporting the cost of school deworming from seven countries in four WHO regions. The estimated cost for drug procurement to cover one million children (including customs clearance and international transport) is approximately US$20 000. The estimated financial costs (including the cost of training of personnel, drug transport, social mobilization and monitoring) is, on average, equivalent to US$33 000 per million school-age children with minimal variation in different countries and continents. The estimated economic costs of distribution (including the time spent by teachers, and health personnel at central, provincial and district level) to cover one million children approximately corresponds to US$19 000. This study shows the minimal cost of school deworming activities, but also shows the significant contribution (corresponding to a quarter of the entire cost of the programme) provided by health and education systems in endemic countries even in the case of drug donations and donor support of distribution costs. PMID:19926104

  17. A non-stationary cost-benefit based bivariate extreme flood estimation approach

    Science.gov (United States)

    Qi, Wei; Liu, Junguo

    2018-02-01

    Cost-benefit analysis and flood frequency analysis have been integrated into a comprehensive framework to estimate cost effective design values. However, previous cost-benefit based extreme flood estimation is based on stationary assumptions and analyze dependent flood variables separately. A Non-Stationary Cost-Benefit based bivariate design flood estimation (NSCOBE) approach is developed in this study to investigate influence of non-stationarities in both the dependence of flood variables and the marginal distributions on extreme flood estimation. The dependence is modeled utilizing copula functions. Previous design flood selection criteria are not suitable for NSCOBE since they ignore time changing dependence of flood variables. Therefore, a risk calculation approach is proposed based on non-stationarities in both marginal probability distributions and copula functions. A case study with 54-year observed data is utilized to illustrate the application of NSCOBE. Results show NSCOBE can effectively integrate non-stationarities in both copula functions and marginal distributions into cost-benefit based design flood estimation. It is also found that there is a trade-off between maximum probability of exceedance calculated from copula functions and marginal distributions. This study for the first time provides a new approach towards a better understanding of influence of non-stationarities in both copula functions and marginal distributions on extreme flood estimation, and could be beneficial to cost-benefit based non-stationary bivariate design flood estimation across the world.

  18. Estimating the costs of induced abortion in Uganda: A model-based analysis

    Science.gov (United States)

    2011-01-01

    Background The demand for induced abortions in Uganda is high despite legal and moral proscriptions. Abortion seekers usually go to illegal, hidden clinics where procedures are performed in unhygienic environments by under-trained practitioners. These abortions, which are usually unsafe, lead to a high rate of severe complications and use of substantial, scarce healthcare resources. This study was performed to estimate the costs associated with induced abortions in Uganda. Methods A decision tree was developed to represent the consequences of induced abortion and estimate the costs of an average case. Data were obtained from a primary chart abstraction study, an on-going prospective study, and the published literature. Societal costs, direct medical costs, direct non-medical costs, indirect (productivity) costs, costs to patients, and costs to the government were estimated. Monte Carlo simulation was used to account for uncertainty. Results The average societal cost per induced abortion (95% credibility range) was $177 ($140-$223). This is equivalent to $64 million in annual national costs. Of this, the average direct medical cost was $65 ($49-86) and the average direct non-medical cost was $19 ($16-$23). The average indirect cost was $92 ($57-$139). Patients incurred $62 ($46-$83) on average while government incurred $14 ($10-$20) on average. Conclusion Induced abortions are associated with substantial costs in Uganda and patients incur the bulk of the healthcare costs. This reinforces the case made by other researchers--that efforts by the government to reduce unsafe abortions by increasing contraceptive coverage or providing safe, legal abortions are critical. PMID:22145859

  19. Estimate of the cost of multiple sclerosis in Spain by literature review.

    Science.gov (United States)

    Fernández, Oscar; Calleja-Hernández, Miguel Angel; Meca-Lallana, José; Oreja-Guevara, Celia; Polanco, Ana; Pérez-Alcántara, Ferran

    2017-08-01

    Multiple Sclerosis (MS) is a progressive disease leading to increasing disability and costs. A literature review was carried out to identify MS costs and to estimate its economic burden in Spain. Areas Covered: The public electronic databases PubMed, ScienceDirect and IBECS were consulted and a manual review of communications presented at related congresses was carried out. A total of 225 references were obtained, of which 43 were finally included in the study. Expert Commentary: Three major cost groups were identified: direct healthcare costs, direct non-healthcare costs and indirect costs. There is a direct relationship between disease progression and increased costs, mainly direct non-healthcare costs (greater need for informal care) and indirect costs (greater loss of productivity). The total cost associated with MS in Spain is €1,395 million per year, and that the mean annual cost per patient is €30,050. Beyond costs, a large impact on the quality of life of patients, with an annual loss of up to 13,000 quality-adjusted life years was also estimated. MS has a large economic impact on Spanish society and a significant impact on the quality of life of patients.

  20. Selection of relevant items for decommissioning costing estimation of a PWR using fuzzy logic

    International Nuclear Information System (INIS)

    Monteiro, Deiglys Borges; Busse, Alexander Lucas; Moreira, Joao M.L.; Maiorino, Jose Rubens

    2015-01-01

    The decommissioning is an important part of a nuclear power plant life cycle which may occur by technical, economical or safety reasons. Decommissioning requires carrying out a large number of tasks that should be planned in advance, involves cost evaluations, preparation of plans of activity and actual operational actions. Despite the large number of tasks, only part of them is relevant for cost estimation purpose. The technical literature and international regulatory agencies suggest a variety of methods for decommissioning cost estimation. Most of them require a very detailed knowledge of the plant and data available suitable for plants that are starting their decommissioning but not for those in the planning stage. The present work aims to apply fuzzy logic to sort out relevant items to cost estimation in order to reduce the work effort involved. The scheme uses parametric equations for specific cost items, and is applied to specific parts of the process of nuclear power plant decommissioning. (author)

  1. ANN Based Approach for Estimation of Construction Costs of Sports Fields

    Directory of Open Access Journals (Sweden)

    Michał Juszczyk

    2018-01-01

    Full Text Available Cost estimates are essential for the success of construction projects. Neural networks, as the tools of artificial intelligence, offer a significant potential in this field. Applying neural networks, however, requires respective studies due to the specifics of different kinds of facilities. This paper presents the proposal of an approach to the estimation of construction costs of sports fields which is based on neural networks. The general applicability of artificial neural networks in the formulated problem with cost estimation is investigated. An applicability of multilayer perceptron networks is confirmed by the results of the initial training of a set of various artificial neural networks. Moreover, one network was tailored for mapping a relationship between the total cost of construction works and the selected cost predictors which are characteristic of sports fields. Its prediction quality and accuracy were assessed positively. The research results legitimatize the proposed approach.

  2. Cost of Equity Estimation in Fuel and Energy Sector Companies Based on CAPM

    Science.gov (United States)

    Kozieł, Diana; Pawłowski, Stanisław; Kustra, Arkadiusz

    2018-03-01

    The article presents cost of equity estimation of capital groups from the fuel and energy sector, listed at the Warsaw Stock Exchange, based on the Capital Asset Pricing Model (CAPM). The objective of the article was to perform a valuation of equity with the application of CAPM, based on actual financial data and stock exchange data and to carry out a sensitivity analysis of such cost, depending on the financing structure of the entity. The objective of the article formulated in this manner has determined its' structure. It focuses on presentation of substantive analyses related to the core of equity and methods of estimating its' costs, with special attention given to the CAPM. In the practical section, estimation of cost was performed according to the CAPM methodology, based on the example of leading fuel and energy companies, such as Tauron GE and PGE. Simultaneously, sensitivity analysis of such cost was performed depending on the structure of financing the company's operation.

  3. Selection of relevant items for decommissioning costing estimation of a PWR using fuzzy logic

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys Borges; Busse, Alexander Lucas; Moreira, Joao M.L.; Maiorino, Jose Rubens, E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: alexlucasb@gmail.com, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas. Programa de Pos-Graduacao em Energia e Engenharia da Energia

    2015-07-01

    The decommissioning is an important part of a nuclear power plant life cycle which may occur by technical, economical or safety reasons. Decommissioning requires carrying out a large number of tasks that should be planned in advance, involves cost evaluations, preparation of plans of activity and actual operational actions. Despite the large number of tasks, only part of them is relevant for cost estimation purpose. The technical literature and international regulatory agencies suggest a variety of methods for decommissioning cost estimation. Most of them require a very detailed knowledge of the plant and data available suitable for plants that are starting their decommissioning but not for those in the planning stage. The present work aims to apply fuzzy logic to sort out relevant items to cost estimation in order to reduce the work effort involved. The scheme uses parametric equations for specific cost items, and is applied to specific parts of the process of nuclear power plant decommissioning. (author)

  4. Aircraft ground damage and the use of predictive models to estimate costs

    Science.gov (United States)

    Kromphardt, Benjamin D.

    Aircraft are frequently involved in ground damage incidents, and repair costs are often accepted as part of doing business. The Flight Safety Foundation (FSF) estimates ground damage to cost operators $5-10 billion annually. Incident reports, documents from manufacturers or regulatory agencies, and other resources were examined to better understand the problem of ground damage in aviation. Major contributing factors were explained, and two versions of a computer-based model were developed to project costs and show what is possible. One objective was to determine if the models could match the FSF's estimate. Another objective was to better understand cost savings that could be realized by efforts to further mitigate the occurrence of ground incidents. Model effectiveness was limited by access to official data, and assumptions were used if data was not available. However, the models were determined to sufficiently estimate the costs of ground incidents.

  5. Transit forecasting accuracy : ridership forecasts and capital cost estimates, final research report.

    Science.gov (United States)

    2009-01-01

    In 1992, Pickrell published a seminal piece examining the accuracy of ridership forecasts and capital cost estimates for fixed-guideway transit systems in the US. His research created heated discussions in the transit industry regarding the ability o...

  6. Equations for estimating stand establishment, release, and thinning costs in the Lake States.

    Science.gov (United States)

    Jeffrey T. Olson; Allen L. Lundgren; Dietmar Rose

    1978-01-01

    Equations for estimating project costs for certain silvicultural treatments in the Lake States have been developed from project records of public forests. Treatments include machine site preparation, hand planting, aerial spraying, prescribed burning, manual release, and thinning.

  7. The Effects of Policy Guidance Emphasizing the Use of Parametric Methods in Cost Estimating

    National Research Council Canada - National Science Library

    Patton, James

    1996-01-01

    .... As one of many initiatives to improve the DoD acquisition process through use of commercial practices, parametric cost estimating has the potential to be helpful in many applications for which it...

  8. Estimated Costs of Continuing Operations in Iraq and Other Operations of the Global War on Terrorism

    National Research Council Canada - National Science Library

    Holtz-Eakin, Douglas

    2004-01-01

    At the request of Senator Conrad, the Congressional Budget Office (CBO) has estimated the costs of military operations in Iraq and Afghanistan and other operations associated with the global war on terrorism (GWOT...

  9. Cost benchmarking of railway projects in Europe – dealing with uncertainties in cost estimates

    DEFF Research Database (Denmark)

    Trabo, Inara

    Past experiences in the construction of high-speed railway projects demontrate either positive or negative financial outcomes of the actual project’s budget. Usually some uncertainty value is included into initial budget calculations. Uncertainty is related to the increase of material prices...... per main cost drivers were compared and analyzed. There were observed nine railway projects, comparable to the Copenhagen-Ringsted project. The results of this comparison provided a certain overview on the cost range in different budget disciplines. The Copenhagen-Ringsted project is positioned right...

  10. Scaling relations of moment magnitude, local magnitude, and duration magnitude for earthquakes originated in northeast India

    Science.gov (United States)

    Bora, Dipok K.

    2016-06-01

    In this study, we aim to improve the scaling between the moment magnitude ( M W), local magnitude ( M L), and the duration magnitude ( M D) for 162 earthquakes in Shillong-Mikir plateau and its adjoining region of northeast India by extending the M W estimates to lower magnitude earthquakes using spectral analysis of P-waves from vertical component seismograms. The M W- M L and M W- M D relationships are determined by linear regression analysis. It is found that, M W values can be considered consistent with M L and M D, within 0.1 and 0.2 magnitude units respectively, in 90 % of the cases. The scaling relationships investigated comply well with similar relationships in other regions in the world and in other seismogenic areas in the northeast India region.

  11. Controlling Campylobacter in the chicken meat chain; Estimation of intervention costs

    OpenAIRE

    Mangen, M.J.J.; Havelaar, A.H.; Poppe, K.J.

    2005-01-01

    Campylobacter infections are a serious public health problem in the Netherlands. As a part of the CARMA project, this study focus on the estimation of the potential direct costs related to the implementation of various intervention measures to control campylobacters in the chicken meat chain. Costs were estimated using a second-order stochastic simulation model. Treating only positively tested flocks is far cheaper than treating all flocks. The implementation of equipment to reduce faecal lea...

  12. Federal Regulations: Efforts to Estimate Total Costs and Benefits of Rules

    Science.gov (United States)

    2004-04-07

    the Chamber of Commerce , academicians, the media, and others, and is sometimes cited with a high degree of certainty ." For example, some articles...House of Representatives, Feb . 25,2004; and testimony of William P . Kovacs, Vice President, U .S. Chamber of Commerce , before the Subcommittee on Energy...estimated the annual cost to employers of the Family and Medical Leave Act at $825 million, but that the Chamber of Commerce estimated the cost at between $3

  13. Using the Black Scholes method for estimating high cost illness insurance premiums in Colombia

    Directory of Open Access Journals (Sweden)

    Liliana Chicaíza

    2009-04-01

    Full Text Available This article applied the Black-Scholes option valuation formula to calculating high-cost illness reinsurance premiums in the Colombian health system. The coverage pattern used in reinsuring high-cost illnesses was replicated by means of a European call option contract. The option’s relevant variables and parameters were adapted to an insurance market context. The premium estimated by the BlackScholes method fell within the range of premiums estimated by the actuarial method.

  14. Cost and price estimate of Brayton and Stirling engines in selected production volumes

    Science.gov (United States)

    Fortgang, H. R.; Mayers, H. F.

    1980-01-01

    The methods used to determine the production costs and required selling price of Brayton and Stirling engines modified for use in solar power conversion units are presented. Each engine part, component and assembly was examined and evaluated to determine the costs of its material and the method of manufacture based on specific annual production volumes. Cost estimates are presented for both the Stirling and Brayton engines in annual production volumes of 1,000, 25,000, 100,000 and 400,000. At annual production volumes above 50,000 units, the costs of both engines are similar, although the Stirling engine costs are somewhat lower. It is concluded that modifications to both the Brayton and Stirling engine designs could reduce the estimated costs.

  15. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  16. The cost of crime to society: new crime-specific estimates for policy and program evaluation.

    Science.gov (United States)

    McCollister, Kathryn E; French, Michael T; Fang, Hai

    2010-04-01

    Estimating the cost to society of individual crimes is essential to the economic evaluation of many social programs, such as substance abuse treatment and community policing. A review of the crime-costing literature reveals multiple sources, including published articles and government reports, which collectively represent the alternative approaches for estimating the economic losses associated with criminal activity. Many of these sources are based upon data that are more than 10 years old, indicating a need for updated figures. This study presents a comprehensive methodology for calculating the cost to society of various criminal acts. Tangible and intangible losses are estimated using the most current data available. The selected approach, which incorporates both the cost-of-illness and the jury compensation methods, yields cost estimates for more than a dozen major crime categories, including several categories not found in previous studies. Updated crime cost estimates can help government agencies and other organizations execute more prudent policy evaluations, particularly benefit-cost analyses of substance abuse treatment or other interventions that reduce crime. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.

  17. Preconception care: preliminary estimates of costs and effects of smoking cessation and folic acid supplementation.

    NARCIS (Netherlands)

    Weerd, S. de; Polder, J.J.; Cohen-Overbeek, T.E.; Zimmermann, L.J.; Steegers, E.A.P.

    2004-01-01

    OBJECTIVE: To assess costs and effectiveness of preconception counseling for all women planning pregnancy in The Netherlands with regard to folic acid supplementation and smoking cessation counseling. STUDY DESIGN: Costs and effects were estimated based on 200,000 women approached yearly and uptake

  18. Thermal and nuclear power generation cost estimates using corporate financial statements

    International Nuclear Information System (INIS)

    Matsuo, Yuhji; Nagatomi, Yu; Murakami, Tomoko

    2012-01-01

    There are two generally accepted methods for estimating power generation costs: so-called 'model plant' method and the method using corporate financial statements. The method using corporate financial statements, though under some constraints, can provide useful information for comparing thermal and nuclear power generation costs. This study used this method for estimating thermal and nuclear power generation costs in Japan for the past five years, finding that the nuclear power generation cost remained stable at around 7 yen per kilowatt-hour (kWh) while the thermal power generation cost moved within a wide range of 9 to 12 yen/kWh in line with wild fluctuations in primary energy prices. The cost of nuclear power generation is expected to increase due to the enhancement of safety measures and accident damage compensation in the future, while there are reactor decommissioning, backend and many other costs that the financial statement-using approach cannot accurately estimate. In the future, efforts should be continued to comprehensively and accurately estimate total costs. (author)

  19. The Effect of Infrastructure Sharing in Estimating Operations Cost of Future Space Transportation Systems

    Science.gov (United States)

    Sundaram, Meenakshi

    2005-01-01

    NASA and the aerospace industry are extremely serious about reducing the cost and improving the performance of launch vehicles both manned or unmanned. In the aerospace industry, sharing infrastructure for manufacturing more than one type spacecraft is becoming a trend to achieve economy of scale. An example is the Boeing Decatur facility where both Delta II and Delta IV launch vehicles are made. The author is not sure how Boeing estimates the costs of each spacecraft made in the same facility. Regardless of how a contractor estimates the cost, NASA in its popular cost estimating tool, NASA Air force Cost Modeling (NAFCOM) has to have a method built in to account for the effect of infrastructure sharing. Since there is no provision in the most recent version of NAFCOM2002 to take care of this, it has been found by the Engineering Cost Community at MSFC that the tool overestimates the manufacturing cost by as much as 30%. Therefore, the objective of this study is to develop a methodology to assess the impact of infrastructure sharing so that better operations cost estimates may be made.

  20. Controlling Campylobacter in the chicken meat chain; Estimation of intervention costs

    NARCIS (Netherlands)

    Mangen, M.J.J.; Havelaar, A.H.; Poppe, K.J.

    2005-01-01

    Campylobacter infections are a serious public health problem in the Netherlands. As a part of the CARMA project, this study focus on the estimation of the potential direct costs related to the implementation of various intervention measures to control campylobacters in the chicken meat chain. Costs

  1. Cost-effectiveness estimates for antenatal HIV testing in the Netherlands

    NARCIS (Netherlands)

    Rozenbaum, M. H.; Verweel, G.; Folkerts, D. K. F.; Dronkers, F.; van den Hoek, J. A. R.; Hartwig, N. G.; de Groot, R.; Postma, M. J.

    2008-01-01

    This paper provides an estimation of the lifetime health-care cost of HIV-infected children and an update of the cost-effectiveness of universal HIV-screening of pregnant women in Amsterdam (The Netherlands). During 2003-2005, we collected data concerning the prevalence of newly diagnosed

  2. Estimating the costs of reducing CO2 emission via avoided deforestation with integrated assessment modelling

    NARCIS (Netherlands)

    Overmars, K.P.; Tabeau, A.A.; Stehfest, E.; Meijl, van J.C.M.

    2012-01-01

    Estimates for deforestation and forest degradation were shown to account for about 17% of greenhouse gas emissions. The implementation of REDD is suggested to provide substantial emission reductions at low costs. Proper calculation of such a costs requires integrated modeling approach involving

  3. Resolving the "Cost-Effective but Unaffordable" Paradox: Estimating the Health Opportunity Costs of Nonmarginal Budget Impacts.

    Science.gov (United States)

    Lomas, James; Claxton, Karl; Martin, Stephen; Soares, Marta

    2018-03-01

    Considering whether or not a proposed investment (an intervention, technology, or program of care) is affordable is really asking whether the benefits it offers are greater than its opportunity cost. To say that an investment is cost-effective but not affordable must mean that the (implicit or explicit) "threshold" used to judge cost-effectiveness does not reflect the scale and value of the opportunity costs. Existing empirical estimates of health opportunity costs are based on cross-sectional variation in expenditure and mortality outcomes by program budget categories (PBCs) and do not reflect the likely effect of nonmarginal budget impacts on health opportunity costs. The UK Department of Health regularly updates the needs-based target allocation of resources to local areas of the National Health Service (NHS), creating two subgroups of local areas (those under target allocation and those over). These data provide the opportunity to explore how the effects of changes in health care expenditure differ with available resources. We use 2008-2009 data to evaluate two econometric approaches to estimation and explore a range of criteria for accepting subgroup specific effects for differences in expenditure and outcome elasticities across the 23 PBCs. Our results indicate that health opportunity costs arising from an investment imposing net increases in expenditure are underestimated unless account is taken of likely nonmarginal effects. They also indicate the benefits (reduced health opportunity costs or increased value-based price of a technology) of being able to "smooth" these nonmarginal budget impacts by health care systems borrowing against future budgets or from manufacturers offering "mortgage" type arrangements. Copyright © 2018 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  4. Construction cost estimation of spherical storage tanks: artificial neural networks and hybrid regression—GA algorithms

    Science.gov (United States)

    Arabzadeh, Vida; Niaki, S. T. A.; Arabzadeh, Vahid

    2017-10-01

    One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven methods for cost estimation based on the application of artificial neural network (ANN) and regression models. The learning algorithms of the ANN are the Levenberg-Marquardt and the Bayesian regulated. Moreover, regression models are hybridized with a genetic algorithm to obtain better estimates of the coefficients. The methods are applied in a real case, where the input parameters of the models are assigned based on the key issues involved in a spherical tank construction. The results reveal that while a high correlation between the estimated cost and the real cost exists; both ANNs could perform better than the hybridized regression models. In addition, the ANN with the Levenberg-Marquardt learning algorithm (LMNN) obtains a better estimation than the ANN with the Bayesian-regulated learning algorithm (BRNN). The correlation between real data and estimated values is over 90%, while the mean square error is achieved around 0.4. The proposed LMNN model can be effective to reduce uncertainty and complexity in the early stages of the construction project.

  5. Estimating the cost-savings associated with bundling maternal and child health interventions: a proposed methodology.

    Science.gov (United States)

    Adesina, Adebiyi; Bollinger, Lori A

    2013-01-01

    There is a pressing need to include cost data in the Lives Saved Tool (LiST). This paper proposes a method that combines data from both the WHO CHOosing Interventions that are Cost-Effective (CHOICE) database and the OneHealth Tool (OHT) to develop unit costs for delivering child and maternal health services, both alone and bundled. First, a translog cost function is estimated to calculate factor shares of personnel, consumables, other direct (variable or recurrent costs excluding personnel and consumables) and indirect (capital or investment) costs. Primary source facility level data from Kenya, Namibia, South Africa, Uganda, Zambia and Zimbabwe are utilized, with separate analyses for hospitals and health centres. Second, the resulting other-direct and indirect factor shares are applied to country unit costs from the WHO CHOICE unit cost database to calculate those portions of unit cost. Third, the remainder of the costs is calculated using default data from the OHT. Fourth, we calculate the effect of bundling services by assuming that a LiST intervention visit takes an average of 20 minutes when delivered alone but only incremental time in addition to the basic visit when delivered in a bundle. Personnel costs account for the greatest share of costs for both hospitals and health centres at 50% and 38%, respectively. The percentages differ between hospitals and health centres for consumables (21% versus 17%), other direct (7.5% versus 6.75%), and indirect (22% versus 23%) costs. Combining the other-direct and indirect factor shares with the WHO CHOICE database and the other costs from OHT provides a comprehensive cost estimate of LiST interventions. Finally, the cost of six recommended antenatal care (ANC) interventions is $69.76 when delivered alone, but $61.18 when delivered as a bundle, a savings of $8.58 (12.2%). This paper proposes a method for estimating a comprehensive cost of providing child and maternal health interventions by combining labor

  6. The cost of universal health care in India: a model based estimate.

    Directory of Open Access Journals (Sweden)

    Shankar Prinja

    Full Text Available INTRODUCTION: As high out-of-pocket healthcare expenses pose heavy financial burden on the families, Government of India is considering a variety of financing and delivery options to universalize health care services. Hence, an estimate of the cost of delivering universal health care services is needed. METHODS: We developed a model to estimate recurrent and annual costs for providing health services through a mix of public and private providers in Chandigarh located in northern India. Necessary health services required to deliver good quality care were defined by the Indian Public Health Standards. National Sample Survey data was utilized to estimate disease burden. In addition, morbidity and treatment data was collected from two secondary and two tertiary care hospitals. The unit cost of treatment was estimated from the published literature. For diseases where data on treatment cost was not available, we collected data on standard treatment protocols and cost of care from local health providers. RESULTS: We estimate that the cost of universal health care delivery through the existing mix of public and private health institutions would be INR 1713 (USD 38, 95%CI USD 18-73 per person per annum in India. This cost would be 24% higher, if branded drugs are used. Extrapolation of these costs to entire country indicates that Indian government needs to spend 3.8% (2.1%-6.8% of the GDP for universalizing health care services. CONCLUSION: The cost of universal health care delivered through a combination of public and private providers is estimated to be INR 1713 per capita per year in India. Important issues such as delivery strategy for ensuring quality, reducing inequities in access, and managing the growth of health care demand need be explored.

  7. The cost of universal health care in India: a model based estimate.

    Science.gov (United States)

    Prinja, Shankar; Bahuguna, Pankaj; Pinto, Andrew D; Sharma, Atul; Bharaj, Gursimer; Kumar, Vishal; Tripathy, Jaya Prasad; Kaur, Manmeet; Kumar, Rajesh

    2012-01-01

    As high out-of-pocket healthcare expenses pose heavy financial burden on the families, Government of India is considering a variety of financing and delivery options to universalize health care services. Hence, an estimate of the cost of delivering universal health care services is needed. We developed a model to estimate recurrent and annual costs for providing health services through a mix of public and private providers in Chandigarh located in northern India. Necessary health services required to deliver good quality care were defined by the Indian Public Health Standards. National Sample Survey data was utilized to estimate disease burden. In addition, morbidity and treatment data was collected from two secondary and two tertiary care hospitals. The unit cost of treatment was estimated from the published literature. For diseases where data on treatment cost was not available, we collected data on standard treatment protocols and cost of care from local health providers. We estimate that the cost of universal health care delivery through the existing mix of public and private health institutions would be INR 1713 (USD 38, 95%CI USD 18-73) per person per annum in India. This cost would be 24% higher, if branded drugs are used. Extrapolation of these costs to entire country indicates that Indian government needs to spend 3.8% (2.1%-6.8%) of the GDP for universalizing health care services. The cost of universal health care delivered through a combination of public and private providers is estimated to be INR 1713 per capita per year in India. Important issues such as delivery strategy for ensuring quality, reducing inequities in access, and managing the growth of health care demand need be explored.

  8. Estimated cost of asthma in outpatient treatment: a real-world study

    Science.gov (United States)

    Costa, Eduardo; Caetano, Rosangela; Werneck, Guilherme Loureiro; Bregman, Maurício; Araújo, Denizar Vianna; Rufino, Rogério

    2018-01-01

    ABSTRACT OBJECTIVE To estimate the cost of diagnosis and treatment of asthma. METHODS We used the perspective of society. We sequentially included for 12 months, in 2011-2012, 117 individuals over five years of age who were treated for asthma in the Pneumology and Allergy-Immunology Services of the Piquet Carneiro Polyclinic, Universidade do Estado do Rio de Janeiro. All of them were interviewed twice with a six-month interval for data collection, covering 12 months. The cost units were identified and valued according to defined methods. We carried out a sensitivity analysis and applied statistical methods with a significance level of 5% for cost comparisons between subgroups. RESULTS The study consisted of 108 patients, and 73.8% of them were women. Median age was 49.5 years. Rhinitis was present in 83.3% of the individuals, and more than half were overweight or obese. Mean family income was U$915.90/month (SD = 879.12). Most workers and students had absenteeism related to asthma. Total annual mean cost was U$1,291.20/patient (SD = 1,298.57). The cost related to isolated asthma was U$1,155.43/patient-year (SD = 1,305.58). Obese, severe, and uncontrolled asthmatic patients had higher costs than non-obese, non-severe, and controlled asthmatics, respectively. Severity and control level were independently associated with higher cost (p = 0.001 and 0.000, respectively). The direct cost accounted for 82.3% of the estimated total cost. The cost of medications for asthma accounted for 62.2% of the direct costs of asthma. CONCLUSIONS Asthma medications, environmental control measures, and long-term health leaves had the greatest potential impact on total cost variation. The results are an estimate of the cost of treating asthma at a secondary level in the Brazilian Unified Health System, assuming that the treatment used represents the ideal approach to the disease. PMID:29641652

  9. Computational Intelligence in Software Cost Estimation: Evolving Conditional Sets of Effort Value Ranges

    OpenAIRE

    Papatheocharous, Efi; Andreou, Andreas S.

    2008-01-01

    In this approach we aimed at addressing the problem of large variances found in available historical data that are used in software cost estimation. Project data is expensive to collect, manage and maintain. Therefore, if we wish to lower the dependence of the estimation to

  10. A stump-to-mill timber production cost-estimating program for cable logging eastern hardwoods

    Science.gov (United States)

    Chris B. LeDoux

    1987-01-01

    ECOST utilizes data from stand inventory, cruise data, and the logging plan for the tract in question. The program produces detailed stump-to-mill cost estimates for specific proposed timber sales. These estimates are then utilized, in combination with specific landowner objectives, to assess the economic feasibility of cable logging a given area. The program output is...

  11. Costing support and cost control in manufacturing. A cost estimation tool applied in the sheet metal domain.

    NARCIS (Netherlands)

    ten Brinke, E.

    2002-01-01

    In the product development cycle several engineering tasks like design, process planning and production planning have to be executed. The execution of these tasks mainly involves information processing and decision-making. Because costs is an important factor in manufacturing, adequate information

  12. Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem

    2015-02-01

    Full Text Available This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded.

  13. Cost estimation of a standalone photovoltaic power system in remote areas of Sarawak, Malaysia

    International Nuclear Information System (INIS)

    Jakhrani, A.Q.; Othman, A.K.; Rigit, A.R.H.; Samo, S.R.

    2012-01-01

    This paper aims to estimate the anticipated costs incurred from a standalone solar photovoltaic power system for the supply of electricity to the rural community in Sarawak, Malaysia. The life cycle cost analysis with net present value technique was employed for the evaluation of cost system. It was found that purchasing of solar photovoltaic components and the system installation cost will contribute 63% of the total investment and future anticipated costs will add to the remaining. Recurring cost will make 25% and components replacements 75% of future anticipated costs. It was discovered that the power generated from the solar photovoltaic system would be 38 times more expensive than electricity produced from the conventional sources. However, its installation in remote areas could be favourable where the grid-connected power supply is not accessible. (author)

  14. Solar thermal technology development: Estimated market size and energy cost savings. Volume 1: Executive summary

    Science.gov (United States)

    Gates, W. R.

    1983-02-01

    Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. The fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. STT R&D is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), dependng on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest.

  15. Solar thermal technology development: Estimated market size and energy cost savings. Volume 1: Executive summary

    Science.gov (United States)

    Gates, W. R.

    1983-01-01

    Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. The fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. STT R&D is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), dependng on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest.

  16. Estimates of the Damage Costs of Climate Change. Part 2. Dynamic Estimates

    International Nuclear Information System (INIS)

    Tol, R.S.J.

    2002-01-01

    Monetised estimates of the impact of climate change are derived. Impacts are expressed as functions of climate change and 'vulnerability'. Vulnerability is measured by a series of indicators, such as per capita income, population above 65, and economic structure. Impacts are estimated for nine world regions, for the period 2000-2200, for agriculture, forestry, water resources, energy consumption, sea level rise, ecosystems, fatal vector-borne diseases, and fatal cardiovascular and respiratory disorders. Uncertainties are large, often including sign switches. In the short term, the estimated sensitivity of a sector to climate change is found to be the crucial parameter. In the longer term, the change in the vulnerability of the sector is often more important for the total impact. Impacts can be negative or positive, depending on the time, region, and sector one is looking at. Negative impacts tend to dominate in the later years and in the poorer regions

  17. Life cycle cost estimation and systems analysis of Waste Management Facilities

    International Nuclear Information System (INIS)

    Shropshire, D.; Feizollahi, F.

    1995-01-01

    This paper presents general conclusions from application of a system cost analysis method developed by the United States Department of Energy (DOE), Waste Management Division (WM), Waste Management Facilities Costs Information (WMFCI) program. The WMFCI method has been used to assess the DOE complex-wide management of radioactive, hazardous, and mixed wastes. The Idaho Engineering Laboratory, along with its subcontractor Morrison Knudsen Corporation, has been responsible for developing and applying the WMFCI cost analysis method. The cost analyses are based on system planning level life-cycle costs. The costs for life-cycle waste management activities estimated by WMFCI range from bench-scale testing and developmental work needed to design and construct a facility, facility permitting and startup, operation and maintenance, to the final decontamination, decommissioning, and closure of the facility. For DOE complex-wide assessments, cost estimates have been developed at the treatment, storage, and disposal module level and rolled up for each DOE installation. Discussions include conclusions reached by studies covering complex-wide consolidation of treatment, storage, and disposal facilities, system cost modeling, system costs sensitivity, system cost optimization, and the integration of WM waste with the environmental restoration and decontamination and decommissioning secondary wastes

  18. Case Study to Apply Work Difficulty Factors to Decommissioning Cost Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Jung, Hyejin; Oh, Jaeyoung; Kim, Younggook [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    This article is prepared as a guideline regarding how to apply the work difficult factor (WDF) when it comes to the estimates of the decommissioning costs. Although several cases of the decommissioning cost estimates have been made for a few commercial nuclear power plants, the different technical, site-specific economic assumptions used make it difficult to interpret those cost estimates and compare them with that of Kori-1. In addition, it is clear that we are supposed to experience difficulties being created in the process of the Kori-1 and the virtual inaccessibility to the limited areas at the pre-decommissioning stage. Estimating decommissioning costs is one of the most crucial processes since it encompasses all the spectrum of decommissioning activities from the planning to the last evaluation on whether the decommissioning has successfully been proceeded from the safety and economic perspectives. Here I suggested the activity dependent costs is only related to WDFs of the incumbent plant planning or undergone to be decommissioned since as a matter of fact, estimating WDFs is the core process to articulately scrutinize the practical costs to apply to Kori-1 project.

  19. Enhancing Groundwater Cost Estimation with the Interpolation of Water Tables across the United States

    Science.gov (United States)

    Rosli, A. U. M.; Lall, U.; Josset, L.; Rising, J. A.; Russo, T. A.; Eisenhart, T.

    2017-12-01

    Analyzing the trends in water use and supply across the United States is fundamental to efforts in ensuring water sustainability. As part of this, estimating the costs of producing or obtaining water (water extraction) and the correlation with water use is an important aspect in understanding the underlying trends. This study estimates groundwater costs by interpolating the depth to water level across the US in each county. We use Ordinary and Universal Kriging, accounting for the differences between aquifers. Kriging generates a best linear unbiased estimate at each location and has been widely used to map ground-water surfaces (Alley, 1993).The spatial covariates included in the universal Kriging were land-surface elevation as well as aquifer information. The average water table is computed for each county using block kriging to obtain a national map of groundwater cost, which we compare with survey estimates of depth to the water table performed by the USDA. Groundwater extraction costs were then assumed to be proportional to water table depth. Beyond estimating the water cost, the approach can provide an indication of groundwater-stress by exploring the historical evolution of depth to the water table using time series information between 1960 and 2015. Despite data limitations, we hope to enable a more compelling and meaningful national-level analysis through the quantification of cost and stress for more economically efficient water management.

  20. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  1. Costs of rearing children in agricultural economies: an alternative estimation approach and findings from rural Bangladesh.

    Science.gov (United States)

    Khan, M M; Magnani, R J; Mock, N B; Saadat, Y S

    1993-03-01

    There are changes in child costs during demographic transition. This study examines household time allocation from 66 agricultural households in 3 villages in Tangail District in rural north central Bangladesh in 1984-85 (371 days). Component and total child-rearing costs are estimated in alternative ways. Conventional "opportunity wage" measures are considered overestimated. The methodological shortcomings of direct cost accounting procedures and consumer demand methods in computing time cost and monetary cost of child rearing are pointed out. In this study's alternative computation, age standardized equivalent costs are generated. Child food consumption costs were generated from a large national survey conducted in 1983. Nonfood expenditures were estimated by food to nonfood expenditure ratios taken from the aforementioned survey. For estimating breast-feeding costs, an estimate was produced based on the assumption that costs for infant food consumption were a fixed proportion of food costs for older children. Land ownership groups were set up to reflect socioeconomic status: 1) landless households, 2) marginal farm households with 1 acre or .4 hectares of land, 3) middle income households with 1-2 acres of land, 4) upper middle income households with 2-4 acres of land, and 5) upper income or rich households with over 4 acres of land. The nonmarket wage rate for hired household help was used to determine the value of cooking, fetching water, and household cleaning and repairing. The results confirm the low costs of child rearing in high fertility societies. Productive nonmarket activities are effective in subsidizing the costs of children. The addition of a child into households already with children has a low impact on time costs of children; "this economies of scale effect is estimated ... at 20%." The highest relative costs were found in the lowest income households, and the lowest costs were in the highest income households. 5% of total household income is

  2. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    International Nuclear Information System (INIS)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options

  3. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  4. Regional Cost Estimates for Reclamation Practices on Arid and Semiarid Lands; TOPICAL

    International Nuclear Information System (INIS)

    W. K. Ostler

    2002-01-01

    The U.S. Army uses the Integrated Training Area Management program for managing training land. One of the major objectives of the Integrated Training Area Management program has been to develop a method for estimating training land carrying capacity in a sustainable manner. The Army Training and Testing Area Carrying Capacity methodology measures training load in terms of Maneuver Impact Miles. One Maneuver Impact Mile is the equivalent impact of an M1A2 tank traveling one mile while participating in an armor battalion field training exercise. The Army Training and Testing Area Carrying Capacity methodology is also designed to predict land maintenance costs in terms of dollars per Maneuver Impact Mile. The overall cost factor is calculated using the historical cost of land maintenance practices and the effectiveness of controlling erosion. Because land maintenance costs and effectiveness are influenced by the characteristics of the land, Army Training and Testing Area Carrying Capacity cost factors must be developed for each ecological region of the country. Costs for land maintenance activities are presented here for the semiarid and arid regions of the United States. Five ecoregions are recognized, and average values for reclamation activities are presented. Because there are many variables that can influence costs, ranges for reclamation activities are also presented. Costs are broken down into six major categories: seedbed preparation, fertilization, seeding, planting, mulching, and supplemental erosion control. Costs for most land reclamation practices and materials varied widely within and between ecological provinces. Although regional cost patterns were evident for some practices, the patterns were not consistent between practices. For the purpose of estimating land reclamation costs for the Army Training and Testing Area Carrying Capacity methodology, it may be desirable to use the ''Combined Average'' of all provinces found in the last row of each table

  5. An Estimation of Private Household Costs to Receive Free Oral Cholera Vaccine in Odisha, India

    Science.gov (United States)

    Mogasale, Vittal; Kar, Shantanu K.; Kim, Jong-Hoon; Mogasale, Vijayalaxmi V.; Kerketta, Anna S.; Patnaik, Bikash; Rath, Shyam Bandhu; Puri, Mahesh K.; You, Young Ae; Khuntia, Hemant K.; Maskery, Brian; Wierzba, Thomas F.; Sah, Binod

    2015-01-01

    Background Service provider costs for vaccine delivery have been well documented; however, vaccine recipients’ costs have drawn less attention. This research explores the private household out-of-pocket and opportunity costs incurred to receive free oral cholera vaccine during a mass vaccination campaign in rural Odisha, India. Methods Following a government-driven oral cholera mass vaccination campaign targeting population over one year of age, a questionnaire-based cross-sectional survey was conducted to estimate private household costs among vaccine recipients. The questionnaire captured travel costs as well as time and wage loss for self and accompanying persons. The productivity loss was estimated using three methods: self-reported, government defined minimum daily wages and gross domestic product per capita in Odisha. Findings On average, families were located 282.7 (SD = 254.5) meters from the nearest vaccination booths. Most family members either walked or bicycled to the vaccination sites and spent on average 26.5 minutes on travel and 15.7 minutes on waiting. Depending upon the methodology, the estimated productivity loss due to potential foregone income ranged from $0.15 to $0.29 per dose of cholera vaccine received. The private household cost of receiving oral cholera vaccine constituted 24.6% to 38.0% of overall vaccine delivery costs. Interpretation The private household costs resulting from productivity loss for receiving a free oral cholera vaccine is a substantial proportion of overall vaccine delivery cost and may influence vaccine uptake. Policy makers and program managers need to recognize the importance of private costs and consider how to balance programmatic delivery costs with private household costs to receive vaccines. PMID:26352143

  6. An Estimation of Private Household Costs to Receive Free Oral Cholera Vaccine in Odisha, India.

    Directory of Open Access Journals (Sweden)

    Vittal Mogasale

    Full Text Available Service provider costs for vaccine delivery have been well documented; however, vaccine recipients' costs have drawn less attention. This research explores the private household out-of-pocket and opportunity costs incurred to receive free oral cholera vaccine during a mass vaccination campaign in rural Odisha, India.Following a government-driven oral cholera mass vaccination campaign targeting population over one year of age, a questionnaire-based cross-sectional survey was conducted to estimate private household costs among vaccine recipients. The questionnaire captured travel costs as well as time and wage loss for self and accompanying persons. The productivity loss was estimated using three methods: self-reported, government defined minimum daily wages and gross domestic product per capita in Odisha.On average, families were located 282.7 (SD = 254.5 meters from the nearest vaccination booths. Most family members either walked or bicycled to the vaccination sites and spent on average 26.5 minutes on travel and 15.7 minutes on waiting. Depending upon the methodology, the estimated productivity loss due to potential foregone income ranged from $0.15 to $0.29 per dose of cholera vaccine received. The private household cost of receiving oral cholera vaccine constituted 24.6% to 38.0% of overall vaccine delivery costs.The private household costs resulting from productivity loss for receiving a free oral cholera vaccine is a substantial proportion of overall vaccine delivery cost and may influence vaccine uptake. Policy makers and program managers need to recognize the importance of private costs and consider how to balance programmatic delivery costs with private household costs to receive vaccines.

  7. COMPARISON OF METHODS FOR ESTIMATING CONTEMPORARY COSTS: AN APPLICATION TO LIVER TRANSPLANTATION IN THE UNITED KINGDOM.

    Science.gov (United States)

    Singh, Jeshika; Longworth, Louise

    2017-01-01

    Our study addresses the important issue of estimating treatment costs from historical data. It is a problem frequently faced by health technology assessment analysts. We compared four approaches used to estimate current costs when good quality contemporary data are not available using liver transplantation as an example. First, the total cost estimates extracted for patients from a cohort study, conducted in the 1990s, were inflated using a published inflation multiplier. Second, resource use estimates from the cohort study were extracted for hepatitis C patients and updated using current unit costs. Third, expert elicitation was carried out to identify changes in clinical practice over time and quantify current resource use. Fourth, routine data on resource use were obtained from National Health Service Blood and Transplant (NHSBT). The first two methods did not account for changes in clinical practice. Also the first was not specific to hepatitis patients. The use of experts confirmed significant changes in clinical practice. However, the quantification of resource use using experts is challenging as clinical specialists may not have a complete overview of clinical pathway. The NHSBT data are the most accurate reflection of transplantation and posttransplantation phase; however, data were not available for the whole pathway of care. The best estimate of total cost, combining NHSBT data and expert elicitation, is £121,211. Observational data from routine care are potentially the most reliable reflection of current resource use. Efforts should be made to make such data readily available and accessible to researchers. Expert elicitation provided reasonable estimates.

  8. Estimating the Cost of Neurosurgical Procedures in a Low-Income Setting: An Observational Economic Analysis.

    Science.gov (United States)

    Abdelgadir, Jihad; Tran, Tu; Muhindo, Alex; Obiga, Doomwin; Mukasa, John; Ssenyonjo, Hussein; Muhumza, Michael; Kiryabwire, Joel; Haglund, Michael M; Sloan, Frank A

    2017-05-01

    There are no data on cost of neurosurgery in low-income and middle-income countries. The objective of this study was to estimate the cost of neurosurgical procedures in a low-resource setting to better inform resource allocation and health sector planning. In this observational economic analysis, microcosting was used to estimate the direct and indirect costs of neurosurgical procedures at Mulago National Referral Hospital (Kampala, Uganda). During the study period, October 2014 to September 2015, 1440 charts were reviewed. Of these patients, 434 had surgery, whereas the other 1006 were treated nonsurgically. Thirteen types of procedures were performed at the hospital. The estimated mean cost of a neurosurgical procedure was $542.14 (standard deviation [SD], $253.62). The mean cost of different procedures ranged from $291 (SD, $101) for burr hole evacuations to $1,221 (SD, $473) for excision of brain tumors. For most surgeries, overhead costs represented the largest proportion of the total cost (29%-41%). This is the first study using primary data to determine the cost of neurosurgery in a low-resource setting. Operating theater capacity is likely the binding constraint on operative volume, and thus, investing in operating theaters should achieve a higher level of efficiency. Findings from this study could be used by stakeholders and policy makers for resource allocation and to perform economic analyses to establish the value of neurosurgery in achieving global health goals. Copyright © 2017 Elsevier Inc. All rights reserved.

  9. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  10. State-Level Estimates of Obesity-Attributable Costs of Absenteeism

    Science.gov (United States)

    Andreyeva, Tatiana; Luedicke, Joerg; Wang, Y. Claire

    2014-01-01

    Objective To provide state-level estimates of obesity-attributable costs of absenteeism among working adults in the U.S. Methods Nationally-representative data from the National Health and Nutrition Examination Survey (NHANES) for 1998–2008 and from the Behavioral Risk Factor Surveillance System (BRFSS) for 2012 are examined. The outcome is obesity-attributable workdays missed in the previous year due to health, and their costs to states. Results Obesity, but not overweight, is associated with a significant increase in workdays absent, from 1.1 to 1.7 extra days missed annually compared to normal weight employees. Obesity-attributable absenteeism among American workers costs the nation an estimated $8.65 billion per year. Conclusion Obesity imposes a considerable financial burden on states, accounting for 6.5%–12.6% of total absenteeism costs in the workplace. State legislature and employers should seek effective ways to reduce these costs. PMID:25376405

  11. Estimating the Cost of Care for Emergency Department Syncope Patients: Comparison of Three Models

    Directory of Open Access Journals (Sweden)

    Marc A. Probst

    2017-02-01

    Full Text Available Introduction: We sought to compare three hospital cost-estimation models for patients undergoing evaluation for unexplained syncope using hospital cost data. Developing such a model would allow researchers to assess the value of novel clinical algorithms for syncope management. Methods: We collected complete health services data, including disposition, testing, and length of stay (LOS, on 67 adult patients (age 60 years and older who presented to the emergency department (ED with syncope at a single hospital. Patients were excluded if a serious medical condition was identified. We created three hospital cost-estimation models to estimate facility costs: V1, unadjusted Medicare payments for observation and/or hospital admission; V2: modified Medicare payment, prorated by LOS in calendar days; and V3: modified Medicare payment, prorated by LOS in hours. Total hospital costs included unadjusted Medicare payments for diagnostic testing and estimated facility costs. We plotted these estimates against actual cost data from the hospital finance department, and performed correlation and regression analyses. Results: Of the three models, V3 consistently outperformed the others with regard to correlation and goodness of fit. The Pearson correlation coefficient for V3 was 0.88 (95% confidence interval [CI] 0.81, 0.92 with an R-square value of 0.77 and a linear regression coefficient of 0.87 (95% CI 0.76, 0.99. Conclusion: Using basic health services data, it is possible to accurately estimate hospital costs for older adults undergoing a hospital-based evaluation for unexplained syncope. This methodology could help assess the potential economic impact of implementing novel clinical algorithms for ED syncope. [West J Emerg Med. 2017;18(2253-257.

  12. Nuclear waste: A look at current use of funds and cost estimates for the future

    International Nuclear Information System (INIS)

    1987-01-01

    The Department of Energy has revised its long-range cost estimates for the disposal of spent nuclear fuel and other highly radioactive waste from about $20 billion to between $21 billion and $41 billion. Delays in meeting some program milestones have added to the costs of the program and consequently DOE has proposed a 5-year delay for the first repository to come on-line. These program uncertainties will limit confidence in the estimates for the next several years. One such uncertainty is the estimated quantity of spent fuel for disposal. DOE's estimating approach overstates the amount of spent fuel that utilities will generate and the fees that they will pay into the Nuclear Waste Fund. As a result, DOE may not be collecting fees at a rate that will cover total program costs and may be overbuilding the waste system

  13. Preliminary estimates of cost savings for defense high level waste vitrification options

    International Nuclear Information System (INIS)

    Merrill, R.A.; Chapman, C.C.

    1993-09-01

    The potential for realizing cost savings in the disposal of defense high-level waste through process and design modificatins has been considered. Proposed modifications range from simple changes in the canister design to development of an advanced melter capable of processing glass with a higher waste loading. Preliminary calculations estimate the total disposal cost (not including capital or operating costs) for defense high-level waste to be about $7.9 billion dollars for the reference conditions described in this paper, while projected savings resulting from the proposed process and design changes could reduce the disposal cost of defense high-level waste by up to $5.2 billion

  14. Use of health plan data to estimate cost and outcomes of a breast cancer population

    International Nuclear Information System (INIS)

    Konski, Andre

    1997-01-01

    Purpose/Objective: To compare insurance billing data with tumor registry data for estimating date of diagnosis and date of recurrence. To collect and estimate cost of treatment from billing data as a step towards performing cost-effective or cost-utility analysis. To correlate first year treatment cost first year with overall cost to enable the former to serve as a proxy for the latter for patients migrating out of insurance plans. Materials and Methods: Billing data for patients(pts.) diagnosed with breast cancer between 1990-1992 was obtained from Paramount Health Plans, a NCQA accredited health plan in Northwest Ohio. Tumor registry and hospital records were surveyed for the clinical data. Total cost of care received by pts., cost of care associated with treatment of breast cancer, and cost of care billed as breast cancer care was collected for each 12 month period from the date of diagnosis. Costs were measured from a payers, i.e. health plans, perspective. Net present value (NPV) costs discounted at a rate of 3% to the year of diagnosis are reported. Pts. were considered in the plan for the entire duration of the study if they were in the plan from the time of diagnosis to the end of the analysis, (12(96)). Students t-test was used to determined statistical differences between groups analyzed. Results: Paramount Health Plan was a small health plan with approximately 10,000-13,000 female enrolees during the study period. Breast cancer was diagnosed in 21 women during 1990-1992 with 18 pts. diagnosed while in the insurance plan and 3 diagnosed prior to entry into the plan. (12(18)) pts. were in the plan for the entire duration of the study. The mean deviation for the date of diagnosis as recorded from tumor registry data, compared to the first date that a diagnosis of breast cancer appears on the billing record is 18 days (range:0-158). Four pts. experienced a recurrence. A determination of a recurrence from insurance records was only possible in (1(4)) pts. who

  15. Estimating the cost of cervical cancer screening in five developing countries

    Directory of Open Access Journals (Sweden)

    Goldie Sue J

    2006-08-01

    Full Text Available Abstract Background Cost-effectiveness analyses (CEAs can provide useful information to policymakers concerned with the broad allocation of resources as well as to local decision makers choosing between different options for reducing the burden from a single disease. For the latter, it is important to use country-specific data when possible and to represent cost differences between countries that might make one strategy more or less attractive than another strategy locally. As part of a CEA of cervical cancer screening in five developing countries, we supplemented limited primary cost data by developing other estimation techniques for direct medical and non-medical costs associated with alternative screening approaches using one of three initial screening tests: simple visual screening, HPV DNA testing, and cervical cytology. Here, we report estimation methods and results for three cost areas in which data were lacking. Methods To supplement direct medical costs, including staff, supplies, and equipment depreciation using country-specific data, we used alternative techniques to quantify cervical cytology and HPV DNA laboratory sample processing costs. We used a detailed quantity and price approach whose face validity was compared to an adaptation of a US laboratory estimation methodology. This methodology was also used to project annual sample processing capacities for each laboratory type. The cost of sample transport from the clinic to the laboratory was estimated using spatial models. A plausible range of the cost of patient time spent seeking and receiving screening was estimated using only formal sector employment and wages as well as using both formal and informal sector participation and country-specific minimum wages. Data sources included primary data from country-specific studies, international databases, international prices, and expert opinion. Costs were standardized to year 2000 international dollars using inflation adjustment and

  16. A model to estimate cost-savings in diabetic foot ulcer prevention efforts.

    Science.gov (United States)

    Barshes, Neal R; Saedi, Samira; Wrobel, James; Kougias, Panos; Kundakcioglu, O Erhun; Armstrong, David G

    2017-04-01

    Sustained efforts at preventing diabetic foot ulcers (DFUs) and subsequent leg amputations are sporadic in most health care systems despite the high costs associated with such complications. We sought to estimate effectiveness targets at which cost-savings (i.e. improved health outcomes at decreased total costs) might occur. A Markov model with probabilistic sensitivity analyses was used to simulate the five-year survival, incidence of foot complications, and total health care costs in a hypothetical population of 100,000 people with diabetes. Clinical event and cost estimates were obtained from previously-published trials and studies. A population without previous DFU but with 17% neuropathy and 11% peripheral artery disease (PAD) prevalence was assumed. Primary prevention (PP) was defined as reducing initial DFU incidence. PP was more than 90% likely to provide cost-savings when annual prevention costs are less than $50/person and/or annual DFU incidence is reduced by at least 25%. Efforts directed at patients with diabetes who were at moderate or high risk for DFUs were very likely to provide cost-savings if DFU incidence was decreased by at least 10% and/or the cost was less than $150 per person per year. Low-cost DFU primary prevention efforts producing even small decreases in DFU incidence may provide the best opportunity for cost-savings, especially if focused on patients with neuropathy and/or PAD. Mobile phone-based reminders, self-identification of risk factors (ex. Ipswich touch test), and written brochures may be among such low-cost interventions that should be investigated for cost-savings potential. Published by Elsevier Inc.

  17. Marginal cost and congestion in the Italian electricity market: An indirect estimation approach

    International Nuclear Information System (INIS)

    Bigerna, Simona; Andrea Bollino, Carlo; Polinori, Paolo

    2015-01-01

    In this paper we construct an indirect measure of the supply marginal cost function for the main generators from the observed bid data in the Italian electricity market in the period 2004–2007. We compute the residual demand function for each generator, taking explicitly into account the issue of transmission line congestion. This procedure allows recovering correct zonal Lerner index and the implied measure of the marginal cost function. We find evidence of a stable U-shaped marginal cost function for three main Italian generators, but a flat function for ENEL, the former national monopolist. The policy relevance of our approach lies in the possibility to offer some empirical knowledge of the marginal cost function of each generator to the regulator to design appropriate policy measures geared to the promotion of competitive market conditions. We propose a new market surveillance mechanism, which is based on the principle of sanctioning excessive deviations from the estimated measure of the marginal cost function presented in this work. -- Highlights: •We construct an indirect measure of the supply marginal cost function. •We compute the residual demand function taking into account transmission line congestion. •We find a general evidence of a stable U-shaped marginal cost function for Italian generators. •We find flat marginal cost function for the former national monopolist. •We use excessive deviations from estimated marginal cost function as a new market surveillance mechanism

  18. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Directory of Open Access Journals (Sweden)

    Merger Eduard

    2012-08-01

    Full Text Available Abstract Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV, and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to

  19. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Science.gov (United States)

    2012-01-01

    Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs) ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV), and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to provide information on the

  20. Chlamydia sequelae cost estimates used in current economic evaluations: does one-size-fit-all?

    Science.gov (United States)

    Ong, Koh Jun; Soldan, Kate; Jit, Mark; Dunbar, J Kevin; Woodhall, Sarah C

    2017-02-01

    Current evidence suggests that chlamydia screening programmes can be cost-effective, conditional on assumptions within mathematical models. We explored differences in cost estimates used in published economic evaluations of chlamydia screening from seven countries (four papers each from UK and the Netherlands, two each from Sweden and Australia, and one each from Ireland, Canada and Denmark). From these studies, we extracted management cost estimates for seven major chlamydia sequelae. In order to compare the influence of different sequelae considered in each paper and their corresponding management costs on the total cost per case of untreated chlamydia, we applied reported unit sequelae management costs considered in each paper to a set of untreated infection to sequela progression probabilities. All costs were adjusted to 2013/2014 Great British Pound (GBP) values. Sequelae management costs ranged from £171 to £3635 (pelvic inflammatory disease); £953 to £3615 (ectopic pregnancy); £546 to £6752 (tubal factor infertility); £159 to £3341 (chronic pelvic pain); £22 to £1008 (epididymitis); £11 to £1459 (neonatal conjunctivitis) and £433 to £3992 (neonatal pneumonia). Total cost of sequelae per case of untreated chlamydia ranged from £37 to £412. There was substantial variation in cost per case of chlamydia sequelae used in published chlamydia screening economic evaluations, which likely arose from different assumptions about disease management pathways and the country perspectives taken. In light of this, when interpreting these studies, the reader should be satisfied that the cost estimates used sufficiently reflect the perspective taken and current disease management for their respective context. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.