WorldWideScience

Sample records for maglev-rail intermodal equipment

  1. Structural parameter optimization design for Halbach permanent maglev rail

    International Nuclear Information System (INIS)

    Guo, F.; Tang, Y.; Ren, L.; Li, J.

    2010-01-01

    Maglev rail is an important part of the magnetic levitation launch system. Reducing the manufacturing cost of magnetic levitation rail is the key problem for the development of magnetic levitation launch system. The Halbach permanent array has an advantage that the fundamental spatial field is cancelled on one side of the array while the field on the other side is enhanced. So this array used in the design of high temperature superconducting permanent maglev rail could improve the surface magnetic field and the levitation force. In order to make the best use of Nd-Fe-B (NdFeB) material and reduce the cost of maglev rail, the effect of the rail's structural parameters on levitation force and the utilization rate of NdFeB material are analyzed. The optimal ranges of these structural parameters are obtained. The mutual impact of these parameters is also discussed. The optimization method of these structure parameters is proposed at the end of this paper.

  2. Structural parameter optimization design for Halbach permanent maglev rail

    Energy Technology Data Exchange (ETDEWEB)

    Guo, F., E-mail: guofang19830119@163.co [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Tang, Y.; Ren, L.; Li, J. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2010-11-01

    Maglev rail is an important part of the magnetic levitation launch system. Reducing the manufacturing cost of magnetic levitation rail is the key problem for the development of magnetic levitation launch system. The Halbach permanent array has an advantage that the fundamental spatial field is cancelled on one side of the array while the field on the other side is enhanced. So this array used in the design of high temperature superconducting permanent maglev rail could improve the surface magnetic field and the levitation force. In order to make the best use of Nd-Fe-B (NdFeB) material and reduce the cost of maglev rail, the effect of the rail's structural parameters on levitation force and the utilization rate of NdFeB material are analyzed. The optimal ranges of these structural parameters are obtained. The mutual impact of these parameters is also discussed. The optimization method of these structure parameters is proposed at the end of this paper.

  3. 76 FR 32906 - Inspection, Repair, and Maintenance; Driver-Vehicle Inspection Report for Intermodal Equipment

    Science.gov (United States)

    2011-06-07

    ... Administration FMCSRs Federal Motor Carrier Safety Regulations IANA Intermodal Association of North America IEP... required to report to the IEP or the providers' designated agent any actual damage or defect in the IME of which the driver or motor carrier is aware at the time the IME is returned to the IEP or the provider's...

  4. Intermodal transportation of spent fuel

    International Nuclear Information System (INIS)

    Elder, H.K.

    1983-09-01

    Concepts for transportation of spent fuel in rail casks from nuclear power plant sites with no rail service are under consideration by the US Department of Energy in the Commercial Spent Fuel Management program at the Pacific Northwest Laboratory. This report identifies and evaluates three alternative systems for intermodal transfer of spent fuel: heavy-haul truck to rail, barge to rail, and barge to heavy-haul truck. This report concludes that, with some modifications and provisions for new equipment, existing rail and marine systems can provide a transportation base for the intermodal transfer of spent fuel to federal interim storage facilities. Some needed land transportation support and loading and unloading equipment does not currently exist. There are insufficient shipping casks available at this time, but the industrial capability to meet projected needs appears adequate

  5. Intermodal Passenger Connectivity Database -

    Data.gov (United States)

    Department of Transportation — The Intermodal Passenger Connectivity Database (IPCD) is a nationwide data table of passenger transportation terminals, with data on the availability of connections...

  6. Architecture of Intermodal Complex

    NARCIS (Netherlands)

    Lee, S.; Herneoja, Aulikki; Österlund, Toni; Markkanen, Piia

    This paper focuses on the conception and design of architecture as the work of producing media about buildings and other environmental artifacts. I approach
    the questions regarding simplicity and complexity through "interdependence" and "intermodality." I believe the two concepts offer more

  7. Freight transport and intermodality

    OpenAIRE

    Barbero Mañanes, Eduardo

    2010-01-01

    During recent decades, there has been very substantial growth in the freight transport sector. Freight transport is increasing faster than the economy or passenger transport. Demand is increasing more rapidly than supply and is resulting in environmental and social problems. Increasing congestion, too, is affecting efficient and reliable freight distribution, and consequently having a deleterious effect on local economies. Intermodality is therefore needed to make better use of alternative mo...

  8. Intermodal Supply Chain Risk Management

    OpenAIRE

    Maslarić, Marinko; Brnjac, Nikolina; Bago, Drago

    2016-01-01

    Efficient and secure global supply chains contribute to the Improvement of the competitiveness of the products traded on international markets by reducing their costs and delivery time while increasing the reliability and security. Global supply chains are unthinkable without transport integration, which is usually accomplished through the form of intermodal transport systems. Intermodal transport systems are much more complex than the unimodal ones due to the number of stakeholders, included...

  9. Intermodal connectivity in Europe, an empirical exploration

    NARCIS (Netherlands)

    de Langen, P.W.; Lases Figueroa, D.M.; van Donselaar, K.H.; Bozuwa, J.

    2017-01-01

    In this paper we analyse the intermodal connectivity in Europe. The empirical analysis is to our knowledge the first empirical analysis of intermodal connections, and is based on a comprehensive database of intermodal connections in Europe. The paper focuses on rail and barge services, as they are

  10. European intermodal freight transport network

    NARCIS (Netherlands)

    Saeedi, Hamid; Wiegmans, Bart; Behdani, Behzad; Zuidwijk, Rob

    2017-01-01

    The analysis of market structure and concentration measures for the Intermodal Freight Transport (IFT) market is important to avoid market failure and to find the areas for policy making to promote IFT market share. This analysis can be performed for separate segments, for example, the market for

  11. A simulation model for intermodal freight transportation in Louisiana.

    Science.gov (United States)

    2015-01-01

    With increased emphasis on intermodal transportation development, the issue of how to evaluate an intermodal freight transportation system and provide intermodal solutions has been receiving intensive attention. In order to improve freight flow effic...

  12. Aerodynamic drag on intermodal railcars

    Science.gov (United States)

    Kinghorn, Philip; Maynes, Daniel

    2014-11-01

    The aerodynamic drag associated with transport of commodities by rail is becoming increasingly important as the cost of diesel fuel increases. This study aims to increase the efficiency of intermodal cargo trains by reducing the aerodynamic drag on the load carrying cars. For intermodal railcars a significant amount of aerodynamic drag is a result of the large distance between loads that often occurs and the resulting pressure drag resulting from the separated flow. In the present study aerodynamic drag data have been obtained through wind tunnel testing on 1/29 scale models to understand the savings that may be realized by judicious modification to the size of the intermodal containers. The experiments were performed in the BYU low speed wind tunnel and the test track utilizes two leading locomotives followed by a set of five articulated well cars with double stacked containers. The drag on a representative mid-train car is measured using an isolated load cell balance and the wind tunnel speed is varied from 20 to 100 mph. We characterize the effect that the gap distance between the containers and the container size has on the aerodynamic drag of this representative rail car and investigate methods to reduce the gap distance.

  13. Surveillance systems for intermodal transportation

    Science.gov (United States)

    Jakovlev, Sergej; Voznak, Miroslav; Andziulis, Arunas

    2015-05-01

    Intermodal container monitoring is considered a major security issue in many major logistic companies and countries worldwide. Current representation of the problem, we face today, originated in 2002, right after the 9/11 attacks. Then, a new worldwide Container Security Initiative (CSI, 2002) was considered that shaped the perception of the transportation operations. Now more than 80 larger ports all over the world contribute to its further development and integration into everyday transportation operations and improve the regulations for the developing regions. Although, these new improvements allow us to feel safer and secure, constant management of transportation operations has become a very difficult problem for conventional data analysis methods and information systems. The paper deals with a proposal of a whole new concept for the improvement of the Containers Security Initiative (CSI) by virtually connecting safety, security processes and systems. A conceptual middleware approach with deployable intelligent agent modules is proposed to be used with possible scenarios and a testbed is used to test the solution. Middleware examples are visually programmed using National Instruments LabView software packages and Wireless sensor network hardware modules. An experimental software is used to evaluate he solution. This research is a contribution to the intermodal transportation and is intended to be used as a means or the development of intelligent transport systems.

  14. INTERMODAL TRANSPORT IN EUROPE - OPPORTUNITIES THROUGH INNOVATION

    Directory of Open Access Journals (Sweden)

    Norbert Wagener

    2014-12-01

    Full Text Available Background: Freight transport volume in ton-km in OECD countries will grow considerably up to 150 to 230 % in 2050 compared to 2010. Although the EU policy aims to shift 30% of road freight over 300 km to other modes such as rail or waterborne transport by 2030 the recent trends show a stable modal split of road at approx. 75%. Conventional intermodal transport on the major European routes has shown a steady but only limited organic growth through recent years. Therefore, new innovative concepts for intermodal transport and for the shift from road to rail are needed. Methods: Definitions of intermodal transport have been clarified and the development of combined transport in Europe and in Germany and Poland in particular has been analyzed on the basis of available data sources. New innovative concepts for intermodal transport have been identified on the basis of desk research, recent relevant projects (RETRACK, SCANDRIA, Rail Baltica and market intelligence. Results: The analysis leads to the conclusion that new innovative concepts in intermodal transport comprise new forms of organization as well as new technologies and new routes. The following three innovations to facilitate the shift from road to rail by intermodal transport are being introduced and discussed: multimodal operation of ocean carriers in maritime hinterland transportation, innovative handling technologies for non-crane able trainers and freight corridors for long distance intermodal transport within the TEN-T network and on the Europe-Asia corridor. Conclusions: Further accelerated growth in the shift from road to rail through intermodal transport requires new innovative concepts beyond the traditional combined transport in Western Europe. Three promising innovative concepts have been introduced. Further research is needed and should be focused on financial and economic appraisal as well as on the effectiveness of state intervention policies. 

  15. Potential for Intermodal Transport of Chemical Goods in Slovakia

    Directory of Open Access Journals (Sweden)

    Jagelčák Juraj

    2017-01-01

    Full Text Available This article deals with intermodal transport of chemical goods in Slovak republic. Analysis is based on information from interviews with companies and logistics service providers. The first part of the article describes importance of Intermodal transport and basic transport routes for intermodal transport. Respondents considered advantages and disadvantages of intermodal transport. Possible improvements inside companies and improvements of external framework conditions to promote modal shift are described in the second part of the paper.

  16. 75 FR 14245 - Voluntary Intermodal Sealift Agreement

    Science.gov (United States)

    2010-03-24

    ... measures so that Contingency planning information can be shared with Participants to enable them to plan... Intermodal Sealift Agreement (VISA) Table of Contents Abbreviations Definitions Preface I. Purpose II... of VISA Contingency Provisions A. General B. Notification of Activation C. Voluntary Capacity D...

  17. Analyzing competition in intermodal freight transport networks

    NARCIS (Netherlands)

    Saeedi, Hamid; Wiegmans, Bart; Behdani, Behzad; Zuidwijk, Rob

    2017-01-01

    To cope with an intense and competitive environment, intermodal freight transport operators have increasingly adopted business practices —like horizontal and vertical business integration—which aim to reduce the operational costs, increase the profit margins, and improve their competitive position

  18. Intermodal transport as an integral part of logistics system

    Directory of Open Access Journals (Sweden)

    Agnieszka Bitkowska

    2016-06-01

    Full Text Available The experience of companies that are successful in the carriage of goods prove that intermodal transport is now a major factor in determining the success of logistics system. A modern approach to the transport is based on intermodal transport. The article is based on the method of external observation. It presents the essence of intermodal transport and its benefits. It specifies transportation as an integral part of logistics system.

  19. Logistics in Yemen: Optimal Intermodal Frieght Transportation

    Directory of Open Access Journals (Sweden)

    Hisham Najeeb Said AL-Shikh

    2017-10-01

    Full Text Available Major roads in Yemen are not paved and its population density is high in coastal areas, implementing the idea of intermodal transportation method all over the coastline will give the product industries a huge advantages, due to its attractive solutions to the poor transportation infrastructure and its extremely limited road transportation system. The transport of goods in Yemen depends heavily on road transport in the absence of rail transport and limited movement by air transport and its high cost, the private sector provides the bulk of land transport services (goods and has accompanied the performance of road transport activities in the absence of regulation and supervision. In this research paper the author intends to analyse and develop optimal intermodal freight transportation plans for product shipping in Yemen by using two modes of transport (truck, ship without any handling of the freight itself when changing modes. Using intermodal transportation is vital for the product movement and supplies when single mode alternative becomes unusable or infeasible. The author intends to use quantitative research method, plan and execute fieldwork, collecting data form freight companies (truck, ship, local factories, Ministry of Transportation, etc. Compile preliminary maps of roads condition and population density. First the author intends to visit the Ministry of Transport to closely monitor the program and objectives of the Ministry and the secret of work and projects in which it is implemented and meet with its representative for the purpose of collecting data and evidence of the difficulties it faces in order to become familiar with it Comprehensively and directly on its problems and study the possible solutions. , the author will intend to visit Aden and Hodeida ports to view the service and facilities for a better understanding of the processes and to examine the availabilities of intermodal transportation freight and collect data of sea

  20. Intermodal Barge Transport : Network Design, Nodes and Competitiveness

    NARCIS (Netherlands)

    Konings, J.W.

    2009-01-01

    The thesis addresses the opportunities and conditions to increase the market share of intermodal barge transport in Northwest Europe. In particular, it focuses on strategies to improve the performances of the different links of the intermodal transport chain: the barge transport services, the

  1. An approach for economic analysis of intermodal transportation.

    Science.gov (United States)

    Sahin, Bahri; Yilmaz, Huseyin; Ust, Yasin; Guneri, Ali Fuat; Gulsun, Bahadir; Turan, Eda

    2014-01-01

    A different intermodal transportation model based on cost analysis considering technical, economical, and operational parameters is presented. The model consists of such intermodal modes as sea-road, sea-railway, road-railway, and multimode of sea-road-railway. A case study of cargo transportation has been carried out by using the suggested model. Then, the single road transportation mode has been compared to intermodal modes in terms of transportation costs. This comparison takes into account the external costs of intermodal transportation. The research reveals that, in the short distance transportation, single transportation modes always tend to be advantageous. As the transportation distance gets longer, intermodal transportation advantages begin to be effective on the costs. In addition, the proposed method in this study leads to determining the fleet size and capacity for transportation and the appropriate transportation mode.

  2. An Approach for Economic Analysis of Intermodal Transportation

    Science.gov (United States)

    Sahin, Bahri; Ust, Yasin; Guneri, Ali Fuat; Gulsun, Bahadir; Turan, Eda

    2014-01-01

    A different intermodal transportation model based on cost analysis considering technical, economical, and operational parameters is presented. The model consists of such intermodal modes as sea-road, sea-railway, road-railway, and multimode of sea-road-railway. A case study of cargo transportation has been carried out by using the suggested model. Then, the single road transportation mode has been compared to intermodal modes in terms of transportation costs. This comparison takes into account the external costs of intermodal transportation. The research reveals that, in the short distance transportation, single transportation modes always tend to be advantageous. As the transportation distance gets longer, intermodal transportation advantages begin to be effective on the costs. In addition, the proposed method in this study leads to determining the fleet size and capacity for transportation and the appropriate transportation mode. PMID:25152919

  3. INTERMODAL TRANSPORTATION: CONSIDERATIONS IN PREFERENCE AND THE PROBLEMS BETWEEN EUROPE AND TURKEY

    OpenAIRE

    Balca Berfin UYGUÇ; Bengü SEVİL OFLAÇ

    2017-01-01

    Intermodal transportation has become increasingly important, as global supply chains tend to spread their activities in diversified countries. Intermodal transportation has its own issues that should be investigated in a deeper sense. Therefore, through conducting semi-structured interviews with logistics companies, this study aims to analyze the considerations in intermodal preference and problems faced during intermodal operations between Europe and Turkey.

  4. Implications of system usability on intermodal facility design.

    Science.gov (United States)

    2010-08-01

    Ensuring good design of intermodal transportation facilities is critical for effective and : satisfactory operation. Passenger use of the facilities is often hindered by inadequate space, a poor : layout, or lack of signage. This project aims to impr...

  5. Sustainable freight transport in South Africa:Domestic intermodal solutions

    Directory of Open Access Journals (Sweden)

    Jan H. Havenga

    2011-11-01

    Full Text Available Due to the rapid deregulation of freight transport in South Africa two decades ago, and low historical investment in rail (with resultant poor service delivery, an integrated alternative to road and rail competition was never developed. High national freight logistics costs, significant road infrastructure challenges and environmental impact concerns of a road-dominated freight transport market have, however, fuelled renewed interest in intermodal transport solutions. In this article, a high-level business case for domestic intermodal solutions in South Africa is presented. The results demonstrate that building three intermodal terminals to connect the three major industrial hubs (i.e. Gauteng, Durban and Cape Town through an intermodal solution could reduce transport costs (including externalities for the identified 11.5 million tons of intermodalfriendly freight flows on the Cape and Natal corridors by 42% (including externalities.

  6. Terminal location planning in intermodal transportation with Bayesian inference method.

    Science.gov (United States)

    2014-01-01

    In this project, we consider the planning of terminal locations for intermodal transportation systems. For a given number of potential terminals and coexisted multiple service pairs, we find the set of appropriate terminals and their locations that p...

  7. Coopetition in Intermodal Freight Transport Services

    Directory of Open Access Journals (Sweden)

    Jian Liu

    2015-01-01

    Full Text Available The paper studies the coopetition of the downstream different carriers by providing complementary transport services in intermodal freight transport chain. Considering different information structure, a two-stage dynamic game model with simultaneous actions on investment and price is first formulated. Equilibria show both parties have motivation to select coopetition even if the agreement for cooperation investment is reached in advance. When both firms agree on the specific allocation, the new coopetition with higher efficiency would be emerged. Moreover, we analyze the complexity and evolution of coopetition by repeated pricing game with finitely and infinitely time horizon. In the finitely repeated pricing game, both firms have incentive to reach a tacit understanding to alternate choosing price cooperation and competition after setting suitable allocation scheme; the repeated periods t are then going to be an issue. In the infinitely repeated pricing game, the perfect cooperation is realized by designing the suitable trigger strategy.

  8. Intermode Breather Solitons in Optical Microresonators

    Science.gov (United States)

    Guo, Hairun; Lucas, Erwan; Pfeiffer, Martin H. P.; Karpov, Maxim; Anderson, Miles; Liu, Junqiu; Geiselmann, Michael; Jost, John D.; Kippenberg, Tobias J.

    2017-10-01

    Dissipative solitons can be found in a variety of systems resulting from the double balance between dispersion and nonlinearity, as well as gain and loss. Recently, they have been observed to spontaneously form in Kerr nonlinear microresonators driven by a continuous wave laser, providing a compact source of coherent optical frequency combs. As optical microresonators are commonly multimode, intermode interactions, which give rise to avoided mode crossings, frequently occur and can alter the soliton properties. Recent works have shown that avoided mode crossings cause the soliton to acquire a single-mode dispersive wave, a recoil in the spectrum, or lead to soliton decay. Here, we show that avoided mode crossings can also trigger the formation of breather solitons, solitons that undergo a periodic evolution in their amplitude and duration. This new breather soliton, referred to as an intermode breather soliton, occurs within a laser detuning range where conventionally stationary (i.e., stable) dissipative Kerr solitons are expected. We experimentally demonstrate the phenomenon in two microresonator platforms (crystalline magnesium fluoride and photonic chip-based silicon nitride microresonators) and theoretically describe the dynamics based on a pair of coupled Lugiato-Lefever equations. We show that the breathing is associated with a periodic energy exchange between the soliton and a second optical mode family, a behavior that can be modeled by a response function acting on dissipative solitons described by the Lugiato-Lefever model. The observation of breathing dynamics in the conventionally stable soliton regime is relevant to applications in metrology such as low-noise microwave generation, frequency synthesis, or spectroscopy.

  9. ECONOMIC BENEFITS OF DEVELOPING INTERMODAL TRANSPORT IN THE EUROPEAN UNION

    Directory of Open Access Journals (Sweden)

    Crisan Radu

    2012-12-01

    Full Text Available Transport plays a crucial role in economic and social development and its contribution goes beyond what is normally captured in traditional cost-benefit analyses. Transportation investments can have large long-term economic, social and environmental impacts. The European Commission when developing transport policy, focuses on the intermodal transport, which is seen as a sustainable mobility solution, environmentally friendly and efficient in terms of resources, especially in terms of freight. European transport policies promote co-modality - combining different modes for a single supply chain - as a solution to the adverse effects of transport: pollution, traffic congestion, energy consumption. Intermodal transport is found to be consistently cheaper than all-road solutions, and its external costs significantly lower, thereby confirming the high potential of intermodal transport in increasing the sustainability of the transport sector. So, freight intermodality is increasingly considered as major potential contributor to solving the sustainability problems of the European transport sector. This paper addresses the pricing issues specifically related to intermodal transport. The focus in on the main economical advantages of developing intermodal transport, but also on the usage limits brought by particularities of transport modes. Special attention is given to intermodal transfer terminals with solutions for activity efficiency increase, with major implications on the quality and cost of transportation. The theme discussed in this paper is of great importance, many authors and specialists developed it in their studies. Some names are needed to be mentioned: Todd Litman, Dr. Yuri V. Yevdokimov, John J. Coyle, Kenneth D. Boyer and few more. But, a special attention for this subject is paid by the European Commission and its subordinated institutions, that are interested in developing sustainable strategies and promoting concrete solutions for

  10. INTERMODAL TRANSPORTATION: CONSIDERATIONS IN PREFERENCE AND THE PROBLEMS BETWEEN EUROPE AND TURKEY

    Directory of Open Access Journals (Sweden)

    Balca Berfin UYGUÇ

    2017-12-01

    Full Text Available Intermodal transportation has become increasingly important, as global supply chains tend to spread their activities in diversified countries. Intermodal transportation has its own issues that should be investigated in a deeper sense. Therefore, through conducting semi-structured interviews with logistics companies, this study aims to analyze the considerations in intermodal preference and problems faced during intermodal operations between Europe and Turkey.

  11. NYSDOT consideration of potential intermodal sites for Long Island : appendices.

    Science.gov (United States)

    2011-06-09

    This Study was prepared in response to the Governor's directive to conduct an extensive analysis of the feasibility of a truck/rail facility on Long Island. It was designed to answer three questions: Is an intermodal truck/rail transfer facility ...

  12. NYSDOT consideration of potential intermodal sites for Long Island.

    Science.gov (United States)

    2011-06-09

    This Study was prepared in response to the Governor's directive to conduct an extensive analysis of the feasibility of a truck/rail : facility on Long Island. It was designed to answer three questions: : Is an intermodal truck/rail transfer facil...

  13. Intermodal transport and distribution patterns in ports relationship to hinterland

    Science.gov (United States)

    Dinu, O.; Dragu, V.; Ruscă, F.; Ilie, A.; Oprea, C.

    2017-08-01

    It is of great importance to examine all interactions between ports, terminals, intermodal transport and logistic actors of distribution channels, as their optimization can lead to operational improvement. Proposed paper starts with a brief overview of different goods types and allocation of their logistic costs, with emphasis on storage component. Present trend is to optimize storage costs by means of port storage area buffer function, by making the best use of free storage time available, most of the ports offer. As a research methodology, starting point is to consider the cost structure of a generic intermodal transport (storage, handling and transport costs) and to link this to intermodal distribution patterns most frequently cast-off in port relationship to hinterland. The next step is to evaluate storage costs impact on distribution pattern selection. For a given value of port free storage time, a corresponding value of total storage time in the distribution channel can be identified, in order to substantiate a distribution pattern shift. Different scenarios for transport and handling costs variation, recorded when distribution pattern shift, are integrated in order to establish the reaction of the actors involved in port related logistic and intermodal transport costs evolution is analysed in order to optimize distribution pattern selection.

  14. Arrangements of intermodal transport in the field of conflicting conventions

    NARCIS (Netherlands)

    K.F. Haak (Krijn); M.A.I.H. Hoeks (Marian)

    2004-01-01

    textabstractThe continuing advance of containerization emphasizes the need for a more uniform legal approach to international intermodal transport. With the current lack of a uniform instrument regulating such transport, the next best solution - both in legal theory as well as in practice - seems to

  15. Intermode traces - fundamental interference phenomenon in quantum and wave physics

    NARCIS (Netherlands)

    Kaplan, A.E.; Stifter, P.; Leeuwen, van K.A.H.; Lamb, W.E.; Schleich, W.P.

    1998-01-01

    Highly regular spatio-temporal or multi-dimensional patterns in the quantum mechanical probability or classical field intensity distributions can appear due to pair interference between individual eigen-modes of the system forming the so called intermode traces. These patterns are strongly

  16. The comprehensive intermodal planning system in distributed environment

    Directory of Open Access Journals (Sweden)

    Olgierd Dziamski

    2013-06-01

    Full Text Available Background: Goods distribution by containers has opened new opportunities for them in the global supply chain network. Standardization of transportation units allow to simplify transport logistics operations and enable the integration of different types of transport. Currently, container transport is the most popular means of transport by sea, but recent studies show an increase in its popularity in land transport. In the paper presented the concept of a comprehensive intermodal planning system in a distributed environment which enables more efficient use containers in the global transport. The aim of this paper was to formulate and develop new concept of Internet Intermodal Planning System in distribution environment, supporting the common interests of the consignors and the logistic service providers by integrating the transportation modes, routing, logistics operations and scheduling in order to create intermodal transport plans. Methods: In the paper presented and discussed the new approach to the management of logistics resources used in international intermodal transport. Detailed analysis of proposed classification of variety transportation means has been carried out along with their specific properties, which may affect the time and cost of transportation. Have been presented the modular web-based distribution planning system supporting container transportation planning. Conducted the analysis of the main planning process and curried out the discussion on the effectiveness of the new web-based container transport planning system. Result and conclusions: This paper presents a new concept of the distributed container transport planning system integrating the available on the market logistics service providers with freight exchange. Specific to container planning new transport categories has been identified which simplify and facilitate the management of intermodal planning process. The paper presents a modular structure of Integrated

  17. Promoting intermodal freight transport through the development of dry ports in Asia: An environmental perspective

    Directory of Open Access Journals (Sweden)

    Shinya Hanaoka

    2011-07-01

    This study reviews the status of intermodal freight transport in Asia from an environmental perspective. It examines intermodal transport opportunities presented by the development of inland dry ports in hinterland locations. This paper also reviews selected case studies of dry port development in Asia. Finally, we present the lessons to be learned for the promotion of intermodal freight transport from selected Asian countries as well as the policy options available.

  18. An intermodal transportation geospatial network modeling for containerized soybean shipping

    Directory of Open Access Journals (Sweden)

    Xiang Liu

    2017-06-01

    Full Text Available Containerized shipping is a growing market for agricultural exports, particularly soybeans. In order to understand the optimal strategies for improving the United States’ economic competitiveness in this emerging market, this research develops an intermodal transportation network modeling framework, focusing on U.S. soybean container shipments. Built upon detailed modal cost analyses, a Geospatial Intermodal Freight Transportation (GIFT model has been developed to understand the optimal network design for U.S. soybean exports. Based on market demand and domestic supply figures, the model is able to determine which domestically produced soybeans should go to which foreign markets, and by which transport modes. This research and its continual studies, will provide insights into future policies and practices that can improve the transportation efficiency of soybean logistics.

  19. Integral Cost-Benefit Analysis of Maglev Rail Projects Under Market Imperfections

    Directory of Open Access Journals (Sweden)

    J. Paul Elhorst

    2008-07-01

    Full Text Available This article evaluates a new mode of high speed ground transportation, the magnetic levitation rail system (Maglev. The outcomes of this evaluation provide policy information on the interregional redistribution of employment and population and the national welfare improvement of two Dutch urban-conglomeration and two Dutch core-periphery projects. This article also compares the results of an integral cost- benefit analysis with those of a conventional cost-benefit analysis and concludes that the additional economic benefits due to market imperfections vary from –1% to +38% of the direct transport benefits, depending on the type of regions connected and the general condition of the economy.

  20. Intermodal Freight Transport on the Right Track? Environmental and economic performances and their trade-off

    International Nuclear Information System (INIS)

    Kim, Nam Seok

    2010-01-01

    This dissertation aims to evaluate environmental and economic performances of an intermodal freight transport system and to estimate the trade-off between CO2 emissions, which is presented as an indicator of environmental performance, and freight costs, which indicate the economic performance of the intermodal freight system. The truck-only system is always regarded as the counterpart of the intermodal freight system in this dissertation. To examine the environmental performance of the intermodal freight system, CO2 emissions generated from all the processes in the intermodal chain, such as pre-haulage and post-haulage, long distance haulage, and transshipment, are estimated considering different sources that generate electricity and transmission loss of electricity (Chapters 3 and 4). To examine the economic performance of the system, two approaches are considered: (1) finding the intermodal breakeven distance for which the intermodal system is more competitive than the truck-only system (Chapter 5); (2) examining the economies of scale in the intermodal network and finding the route/system choice that minimizes the total freight transportation costs (Chapter 6). Finally, this dissertation attempts to find the trade-off between CO2 emissions (representing the environmental performance) and freight transportation cost (representing the economic performance) (Chapter 7)

  1. Cost, carbon emissions and modal shift in intermodal network design decisions

    NARCIS (Netherlands)

    Bouchery, Y.; Fransoo, J.C.

    2014-01-01

    Intermodal transportation is often presented as an efficient solution for reducing carbon emissions without compromising economic growth. In this article, we present a new intermodal network design model in which both the terminal location and the allocation between direct truck transportation and

  2. Cost, carbon emissions and modal shift in intermodal network design decisions

    NARCIS (Netherlands)

    Bouchery, Y.; Fransoo, J.C.

    2015-01-01

    Intermodal transportation is often presented as an efficient solution for reducing carbon emissions without compromising economic growth. In this article, we present a new intermodal network design model in which both the terminal location and the allocation between direct truck transportation and

  3. STUDY OF THE EXPERIENCE OF USE OF INTERMODAL TECHNOLOGY IN THE ORGANIZATION OF PASSENGER TRANSPORTATIONS

    Directory of Open Access Journals (Sweden)

    Liudmila Andreevna Paramonova

    2017-05-01

    Full Text Available This article examines the practice of applying intermodal technology and a single transportation document in the organization of passenger transportations, contains a review of the projects on the use of intermodal technology from theoretical point of view, an analysis of the implemented models.

  4. Value of ITS information for congestion avoidance in inter-modal transportation systems : phase II.

    Science.gov (United States)

    2010-03-01

    Our project has four major mile-stones for the second year: : Mile-stone #1: Develop Dynamic Inter-modal Transportation Optimization Models: For : mostly air-road network and inter-modal networks significant to OHIO : MICHIGAN regions and our col...

  5. The performance of intermodal inland waterway transport : Modeling conditions influencing its competitiveness

    NARCIS (Netherlands)

    Wiegmans, B.; Konings, J.W.

    2013-01-01

    In Europe, numerous obstacles have been identified which prevent the (extensive) use of intermodal transport. A major motivation to promote intermodal transport is that its cost performance is often assumed better than road-only transport. Considering that the cost of transport services remains one

  6. Railroad Terminals and Stations - INTERMODAL_TERMINAL_NTAD_IN: Intermodal Terminal Facilities in Indiana (Bureau of Transportation Statistics, 1:100,000 Point Shapefile)

    Data.gov (United States)

    NSGIC State | GIS Inventory — BTS metadata states – “The Intermodal Terminal Facilities data set contains geographic data for trailer-on-flatcar (TOFC) and container-on-flatcar (COFC) highway...

  7. Dynamics of intermodal logistical systems on containerisation and road transportation in Durban, South Africa

    Directory of Open Access Journals (Sweden)

    Nerissa Govender

    2014-12-01

    Full Text Available The underlying port operations in Durban, South Africa, epitomise intense global competitiveness in the intermodal logistics chain. The link between containerisation and theroad transport network can falter as a result of the dynamics of the logistics system. The main objective of the study was to establish the extent of the intermodal challenges of logistical systems on containerisation to which the role of intermodal sea–road freight transportation enhances the logistical competitiveness. It further examined the intermodal relationship on containerised freight between the challenges of containerisation processes and the effects on road freight transport mode. The impact of containerisation on intermodalism, the sea–road freight transport network and the technological attributes of security-based systems and logistical tracking protocols influence the systematic movement of containers on Durban’s public roads.

  8. A system dynamics approach to intermodalism at the Port of Lewiston

    Energy Technology Data Exchange (ETDEWEB)

    Sebo, D.

    1996-08-01

    Intermodalism refers to interconnections among modes of transportation, e.g., road, rail, water, and air. Effective intermodal planning must cross boundaries between the public and private sectors as well as transportation modes. The development of an effective and efficient intermodal transportation system requires the identification of barriers to intermodal transportation and the investigation of the impact of proposed changes in infrastructure development, policies, regulations, and planning. A systems approach is necessary to adequately represent the interaction between the sometimes incompatible concerns of all modes and stakeholders. A systems dynamics model of intermodalism at the Port of Lewiston has been developed to highlight leverage points, hidden assumptions, second order effects resulting from feedback loops and system drivers. The purpose of this document is to present the results of the system dynamics model work.

  9. The potential of intermodal transport projects in Romania

    Directory of Open Access Journals (Sweden)

    Tudorica Alexandra

    2017-07-01

    Full Text Available The transport infrastructure sector is facing challenges related to the decarbonisation, financing and integrated developments, which need to be overcome so it can gain a competitive advantage among the strategic economic sectors. Known as a major pollutant, with 23.3 % of the total EU-28 GHG emissions in 2014, one of the transport policy objectives is to lower this percentage, by focusing on innovative solutions and modal shift (Eurostat, 2016. The White Paper (2011 promotes a sustainable development, aiming at a reduction by 60% by 2050 of the carbon emissions generated by the transport sector and at a modal shift from road to rail or waterborne transport for freight transport over 300 km with 30% by 2030, and more than 50% by 2050. The focus on an integrated development of the transport sector at the European level was reinforced with the adoption of the EU Regulation no. 1315/2013, marking the transition from a patchwork of different projects towards a vision for the achievement of an EU transport network. Moreover, another challenge is related to the scarce availability of the public money, making it necessary to attract private parties in the development of the transport infrastructure projects (The Investment Plan for Europe, 2014. Supporting the development of the intermodal transport is a way of surmounting the obstacles that this sector is confronting with, which is being implemented in Europe. The intermodal transport is introducing a paradigm shift, allowing the integration of the different transport modes together with their own advantages, as opposed to competing stand-alone modes and it can aid in the fight against climate change, scarce financial resources and congestion This article aims at determining the potential of Romania, as a member of European Union, to develop intermodal transport projects, to identify the funding sources, the obstacles and the solutions to promote the successful implementation of such projects.

  10. Superthin resonator dye laser with THz intermode frequency separation

    International Nuclear Information System (INIS)

    Rudych, P D; Surovtsev, N V

    2014-01-01

    Two-color laser irradiation is considered an effective way to pump THz excitations for numerous scientific and applied goals. We present a design for convenient laser source with THz intermode frequency separation. The setup is based on dye laser with superthin resonator pumped by a subnanosecond pulse laser. It was proven that the superthin resonator dye laser is useful, possesses high stability and high energy conversion, and generates narrow laser modes. The ability of this laser to pump CARS processes for THz vibrations is demonstrated. (letter)

  11. Mechanics of inter-modal tunneling in nonlinear waveguides

    Science.gov (United States)

    Jiao, Weijian; Gonella, Stefano

    2018-02-01

    In this article, we investigate the mechanics of nonlinearly induced inter-modal energy tunneling between flexurally-dominated and axially-dominated modes in phononic waveguides. Special attention is devoted to elucidating the role played by the coupling between axial and flexural degrees of freedom in the determination of the available mode hopping conditions and the associated mechanisms of deformation. Waveguides offer an ideal test bed to investigate the mechanics of nonlinear energy tunneling, due to the fact that they naturally feature, even at low frequencies, families of modes (flexural and axial) that are intrinsically characterized by extreme complementarity. Moreover, thanks to their geometric simplicity, their behavior can be explained by resorting to intuitive structural mechanics models that effectively capture the dichotomy and interplay between flexural and axial mechanisms. After having delineated the fundamental mechanics of flexural-to-axial hopping using the benchmark example of a homogeneous structure, we adapt the analysis to the case of periodic waveguides, in which the complex dispersive behavior due to periodicity results in additional richness of mode hopping mechanisms. We finally extend the analysis to periodic waveguides with internal resonators, in which the availability of locally-resonant bandgaps implies the possibility to activate the resonators even at relatively low frequencies, thus increasing the degree of modal complementarity that is available in the acoustic range. In this context, inter-modal tunneling provides an unprecedented mechanism to transfer conspicuous packets of energy to the resonating microstructure.

  12. The importance of inter-modal transport system in Nigeria with ...

    African Journals Online (AJOL)

    The importance of inter-modal transport system in Nigeria with reference to the Asaba-Onitsha transport corridor since the pre-colonial period. ... EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT.

  13. The Joint Modular Intermodal Container, is this the Future of Naval Logistics?

    National Research Council Canada - National Science Library

    Johnson, Mark E

    2005-01-01

    .... One mission area that is prime for manpower reduction is naval logistics. JMIC, the Joint Military Intermodal Container is a combined Naval Sea Systems Command/ Office of the Chief of Naval Operations (NAVSEA/OPNAV...

  14. Quantitative research regarding performance measures for intermodal freight transportation : executive summary

    Science.gov (United States)

    1995-10-01

    The primary objective of this study is to provide information relative to the development of a set of performance measures for intermodal freight transportation. To accomplish this objective, data was collected, processed, and analyzed on the basis o...

  15. The Cargo Fare Class Mix problem for an intermodal corridor : revenue management in synchromodal container transportation

    NARCIS (Netherlands)

    van Riessen, B.; Negenborn, R.R.; Dekker, Rommert

    2017-01-01

    The intermodal hinterland transportation of maritime containers is under pressure from port authorities and shippers to achieve a more integrated, efficient network operation. Current optimisation methods in literature yield limited results in practice, though, as the transportation product

  16. The Cargo Fare Class Mix problem for an intermodal corridor: revenue management in synchromodal container transportation

    NARCIS (Netherlands)

    B. van Riessen (Bart); R.R. Negenborn (Rudy); R. Dekker (Rommert)

    2017-01-01

    textabstractThe intermodal hinterland transportation of maritime containers is under pressure from port authorities and shippers to achieve a more integrated, efficient network operation. Current optimisation methods in literature yield limited results in practice, though, as the transportation

  17. On Transport Service Selection in Intermodal Rail/Road Distribution Networks

    Directory of Open Access Journals (Sweden)

    Christian Bierwirth

    2012-11-01

    Full Text Available Intermodal rail/road freight transport constitutes an alternative to long-haul road transport for the distribution of large volumes of goods. The paper introduces the intermodal transportation problem for the tactical planning of mode and service selection. In rail mode, shippers either book train capacity on a per-unit basis or charter block trains completely. Road mode is used for short-distance haulage to intermodal terminals and for direct shipments to customers. We analyze the competition of road and intermodal transportation with regard to freight consolidation and service cost on a model basis. The approach is applied to a distribution system of an industrial company serving customers in eastern Europe. The case study investigates the impact of transport cost and consolidation on the optimal modal split.

  18. Harvesting vibrational energy due to intermodal systems via nano coated piezo electric devices.

    Science.gov (United States)

    2015-12-01

    Vibrational energy resulting from intermodal transport systems can be recovered through the use of energy harvesting system consisting of PZT piezo electric material as the primary energy harvesting component. The ability of traditional PZT piezo ele...

  19. Feasibility of using cellular telephone data to determine the truckshed of intermodal facilities.

    Science.gov (United States)

    2010-03-01

    In order to determine the feasibility of using cellular telephone location data in deriving the geographic extent : (truckshed) from intermodal facilities, this study was conducted to determine the feasibility analysis in three aspects: : technology,...

  20. Updating and improving methodology for prioritizing highway project locations on the strategic intermodal system (SIS).

    Science.gov (United States)

    2016-04-01

    The Florida Department of Transportation (FDOT) District One developed the Congestion Management Process : (CMP) system to prioritize low-cost, near-term highway improvements on the Strategic Intermodal System (SIS). : The existing CMP system is desi...

  1. Alternative transport network designs and their implications for intermodal transhipment technologies

    OpenAIRE

    Woxenius, Johan

    2007-01-01

    Six principles for operation of the rail part of intermodal rail freight transport systems are described: direct link, corridor, hub-and-spoke, connected hubs, static routes, and dynamic routes. The first part is a theoretical discussion of the characteristics of the transport network designs. The theory is then applied to intermodal freight transport by analysing how each transport network design affects the need for terminal performance. The discussion includes a classification of existing ...

  2. A Simulation Platform for Combined Rail/Road Transport in Multiyards Intermodal Terminals

    OpenAIRE

    Chen, Xuchao; He, Shiwei; Li, Tingting; Li, Yubin

    2018-01-01

    With the rapid development of multiyards railway intermodal terminal (MYRIT) construction in China, performance evaluation has become an important issue for terminal design and management departments. Due to the complexity of the multiyards terminal and the associated rail network, the train moving process and related terminal operations have become more complicated compared with the traditional intermodal container terminal. However, in general simulation platforms, the train moving process ...

  3. High-energy fiber lasers at non-traditional colours, via intermodal nonlinearities

    DEFF Research Database (Denmark)

    Rishøj, Lars Søgaard; Chen, Y.; Steinvurzel, P.

    2012-01-01

    We propose exploiting intermodal four-wave mixing for energy-scalable tuneable fiber lasers, hitherto restricted to low powers, constrained by dispersion-tailoring limitations in PCFs. Conversion over an octave, at mJ-energy-levels, appears feasible.......We propose exploiting intermodal four-wave mixing for energy-scalable tuneable fiber lasers, hitherto restricted to low powers, constrained by dispersion-tailoring limitations in PCFs. Conversion over an octave, at mJ-energy-levels, appears feasible....

  4. Intermodal parametric gain of degenerate four wave mixing in large mode area hybrid photonic crystal fibers

    DEFF Research Database (Denmark)

    Petersen, Sidsel Rübner; Lægsgaard, Jesper; Alkeskjold, Thomas Tanggaard

    2013-01-01

    Intermodal degenerate four wave mixing (FWM) is investigated numerically in large mode area hybrid photonic crystal fibers. The dispersion is controlled independently of core size, and thus allows for power scaling of the FWM process.......Intermodal degenerate four wave mixing (FWM) is investigated numerically in large mode area hybrid photonic crystal fibers. The dispersion is controlled independently of core size, and thus allows for power scaling of the FWM process....

  5. Intermodal Logistics Centres and Freight Corridors – Concepts and Trends

    Directory of Open Access Journals (Sweden)

    Norbert Wagener

    2017-09-01

    Full Text Available . Background: The development of international freight corridors, as the Trans European Network and new rail and inland shipping corridors in Asia and Africa, require efficient logistics centres along these corridors which serve as intermodal interfaces and provide a variety of different logistics service functions. The definition of the term logistics centre differs between countries and implies different functionalities. Locations are often selected randomly and business models are opportunity driven, especially in highly dynamic and less regulated new emerging economies. In particular Freight Villages as a special form of logistics centres have a high impact on regional development and serve as cargo generator for freight corridors. Consideration of general principles how to establish Freight Villages could improve the effectiveness of these logistics centres along freight corridors. Methods: Based on a literature review a comprehensive and hierarchical definition of logistics centres will be discussed and applied. From experiences in the development of logistics centres in several countries, especially in Germany and Lithuania, challenges and concepts concerning regulatory framework, determination of location and business and financing models are discussed. Results: Concerning the definition of logistics centres a hierarchical definition is applied which comprises different levels of logistics centres depending on the scope of the value adding and the functionality. As general principles for the development of Freight Villages the active role of the state, master planning, objective location finding, participation and co-operation of different stakeholders in the business model and a stepwise scheme for financing are introduced. Major trends for the future development of Freight Villages are the digitalization of supply chains, the application of new intermodal technologies and of innovative telematics systems, solutions for low emission and

  6. SOCIO-ENVIRONMENTAL SUSTAINABILITY OF INTERMODAL TERMINALS IN BRAZIL: AN EXPLORATORY ANALYSIS

    Directory of Open Access Journals (Sweden)

    Diogo Palheta Nery

    2017-05-01

    Full Text Available The Brazilian agribusiness excels in international trade, but it has some problems as the concentration of roads in the country's transport matrix, which reduces the competitiveness of the sector. The intermodality is a solution to this problem because it uses the advantages of various modes of transport. Moreover, intermodality becomes logistics more sustainable by reducing the environmental impacts of its activities. Intermodal terminals are the links that allow intermodality, however, studies about the sustainability of the terminals are scarce. This research intended to fill this gap aiming to analyze the socio-environmental sustainability of Brazil's grains logistics intermodal terminals. The specific objectives were: to raise variables about socio-environmental sustainability in logistics terminals and to identify socio-environmental sustainability practices in logistics terminals surveyed. This used an exploratory approach. The sample was composed of 31 Brazilian intermodal terminals. It was found that the terminals are prioritizing social practices, but further studies are needed to confirm or refute the findings.

  7. The concept of intermodal network development in Poland using multi-agent systems

    Directory of Open Access Journals (Sweden)

    Leszek MINDUR

    2011-01-01

    Full Text Available The market share and the development of intermodal haulages, they are still at a very low level. It amounts in total goods transported by rail to 2,5% - 3%. The major reason for this situation is lack of coherent method for intermodal network designing. Such method should take into consideration strong relations between transport users, transport service providers, so the micro scale, as well as the regions where they are operating, so the meta scale.The aim of this paper is to present method which makes possible elimination of existing barriers in intermodal transport. The proposed method, for the sake of relations between actors involved in intermodal transport organisation, refers to multi-agent system concept. This system assumes coordinated actions in favour of concrete problem solution with support of cooperating agents, that is, in described paper, actors connected with intermodal transport.Paper presents results of the research project N509 398536, called: „Intermodal logistics network in Poland – concept of model solutions and implementation aspects” carried out by the Institute of Logistics and Warehousing under scientific leadership of professor Leszek Mindur.

  8. 76 FR 29169 - Requirements for Intermodal Equipment Providers and for Motor Carriers and Drivers Operating...

    Science.gov (United States)

    2011-05-20

    ... amended the December 2008 final rule to: (1) Create an additional marking option for identifying the IEP... transmit a no-defect DVIR to the IEP at the time the IME is returned to the IEP. The petitioners contend...

  9. 75 FR 51419 - Requirements for Intermodal Equipment Providers and for Motor Carriers and Drivers Operating...

    Science.gov (United States)

    2010-08-20

    ... additional marking option for identifying the IEP responsible for the inspection, repair, and maintenance of... motor carriers to prepare and transmit a DVIR to the IEP at the time the IME is returned to the IEP even... no defects or deficiencies. The Agency notes that Sec. 390.40(d) of the FMCSRs requires an IEP to...

  10. 77 FR 34846 - Inspection, Repair, and Maintenance; Driver-Vehicle Inspection Report for Intermodal Equipment

    Science.gov (United States)

    2012-06-12

    ... report EDI Electronic data interchange FHWA Federal Highway Administration FMCSRs Federal Motor Carrier...-copy paperwork to unassisted electronic data interchange (EDI) transmissions. IANA added that the... system, or EDI and transmittals of files in various formats. IANA noted that its program offers IEPs and...

  11. VeriTainer radiation detector for intermodal shipping containers

    International Nuclear Information System (INIS)

    Redus, R.H.; Alioto, M.; Sperry, D.; Pantazis, T.

    2007-01-01

    The VeriSpreader TM radiation detection system will monitor every container passing through a shipping terminal without impeding the flow of commerce by making the radiation measurements during normal container handling. This is accomplished by integrating neutron and spectroscopic γ-ray detectors into a container crane spreader bar, the part of the crane that directly engages the intermodal shipping containers while moving from ship to shore and vice versa. The use of a spectroscopic γ-detector reduces the rate of nuisance alarms due to naturally occurring radioactive material (NORM). The combination of γ and neutron detection reduces the effectiveness of shielding and countermeasures. The challenges in this spreader bar-based approach arise from the harsh environment, particularly the mechanical shock and the vibration of the moving spreader bar, since the measurement is taken while the container is moving. The electrical interfaces in the port environment, from the crane to a central monitoring office, present further challenges. It is the packaging, electronic interfaces, and data processing software that distinguish this system, which is based on conventional radiation sensors. The core of the system is Amptek's GAMMA-RAD, which integrates a ruggedized scintillator/PMT, digital pulse shaping electronics, electronics for the neutron detector, power supplies, and an Ethernet interface. The design of the VeriTainer system and results from both the laboratory and a proof-of-concept test at the Port of Oakland, California will be presented

  12. Study of inter-modal four wave mixing in two few-mode fibres with different phase matching properties

    DEFF Research Database (Denmark)

    Parmigiani, F.; Jung, Y.; Friis, Søren Michael Mørk

    2016-01-01

    We experimentally study inter-modal four-wave mixing (FWM) in few-mode fibres with different phase matching properties. The possibility of transmitting two spatial modes without intermodal FWM cross-talk in the C-band is presented....

  13. Detailed phase matching characterization of inter-modal four-wave mixing in a two-mode fiber

    DEFF Research Database (Denmark)

    Friis, Søren Michael Mørk; Jung, Y.; Begleris, I.

    2016-01-01

    We experimentally characterize the phase matching properties of two inter-modal four-wave mixing processes in a graded index fiber guiding the LP01 and LP11 mode-groups.......We experimentally characterize the phase matching properties of two inter-modal four-wave mixing processes in a graded index fiber guiding the LP01 and LP11 mode-groups....

  14. Intermodal Matching on the Example of Sound and Color Connection in Norm and Pathology

    Directory of Open Access Journals (Sweden)

    Dyachenko A.

    2017-05-01

    Full Text Available The article describes the initial period of research of synesthesia and further work, experimental and theoretical, related to the study of various intermodal correspondences. Information about the presence of a statistically significant phenomenon of various intermodal correspondences in healthy people (which includes for example the connection of sound and color is provided. Present experiment reveals that the phenomenon of sound-color correspondences undergoes destructive changes in patients with schizophrenia compared with that in healthy individuals, but does not detect new distinct patterns.

  15. Analyzing the impact of intermodal facilities to the design and management of biofuels supply chain.

    Science.gov (United States)

    2010-01-01

    This paper analyzes the impact that an intermodal facility has on location and transportation : decisions for biofuel production plants. Location decisions impact the management of the in-bound and out-bound logistics of a plant. We model this supply...

  16. Optimizing Intermodal Train Schedules with a Design Balanced Network Design Model

    DEFF Research Database (Denmark)

    Pedersen, Michael Berliner; Crainic, Teodor Gabriel

    We present a modeling approach for optimizing intermodal trains schedules based on an infrastructure divided into time-dependent train paths. The formulation can be generalized to a capacitated multi commodity network design model with additional design balance constraints. We present a Tabu Search...

  17. Auditory-Visual Intermodal Matching of Small Numerosities in 6-Month-Old Infants

    Science.gov (United States)

    Kobayashi, Tessei; Hiraki, Kazuo; Hasegawa, Toshikazu

    2005-01-01

    Recent studies have reported that preverbal infants are able to discriminate between numerosities of sets presented within a particular modality. There is still debate, however, over whether they are able to perform intermodal numerosity matching, i.e. to relate numerosities of sets presented with different sensory modalities. The present study…

  18. How Uncertain Information on Service Capacity Influences the Intermodal Routing Decision: A Fuzzy Programming Perspective

    Directory of Open Access Journals (Sweden)

    Yan Sun

    2018-01-01

    Full Text Available Capacity uncertainty is a common issue in the transportation planning field. However, few studies discuss the intermodal routing problem with service capacity uncertainty. Based on our previous study on the intermodal routing under deterministic capacity consideration, we systematically explore how service capacity uncertainty influences the intermodal routing decision. First of all, we adopt trapezoidal fuzzy numbers to describe the uncertain information of the service capacity, and further transform the deterministic capacity constraint into a fuzzy chance constraint based on fuzzy credibility measure. We then integrate such fuzzy chance constraint into the mixed-integer linear programming (MILP model proposed in our previous study to develop a fuzzy chance-constrained programming model. To enable the improved model to be effectively programmed in the standard mathematical programming software and solved by exact solution algorithms, a crisp equivalent linear reformulation of the fuzzy chance constraint is generated. Finally, we modify the empirical case presented in our previous study by replacing the deterministic service capacities with trapezoidal fuzzy ones. Using the modified empirical case, we utilize sensitivity analysis and fuzzy simulation to analyze the influence of service capacity uncertainty on the intermodal routing decision, and summarize some interesting insights that are helpful for decision makers.

  19. Impact of intermodal facilities to the design of supply chains for biorefineries.

    Science.gov (United States)

    2009-08-15

    This paper analyzes the impact that an intermodal facility has on location and transportation decisions for biofuel production plants. Location decisions impact the management of the in-bound and out-bound logistics of a plant. We model this supply c...

  20. Hub exchange operations in intermodal hub-and spoke networks: A performance comparison of rail-rail exchange facilities

    OpenAIRE

    Bontekoning, Y.M.

    2006-01-01

    The implementation of hub-and-spoke networks in intermodal transport is suggested as one of the potential solutions for helping to increase the intermodal market share. Traditionally, trains are shunted at hubs; this is a time-consuming process. Since the early 1990s a new type of intermodal terminal, specifically designed for fast tran-shipment at nodes in hub-and-spoke networks, has been introduced in Europe. These hub terminals could replace this time-consuming shunting. Studies on the new...

  1. Identification of a leadership competency model for use in the development, recruitment & retention of intermodal transportation workers.

    Science.gov (United States)

    2010-05-01

    The purpose of this research was to determine the competencies that predict highly effective : performance in intermodal transportation managers and that will pave the way for development : of a core competency model that can be used to recruit, trai...

  2. Intermodal container transport logistics to andfrom Malaysian ports : Evaluation of Customer requirements and environmental eff‡ects

    OpenAIRE

    Nasir, Sharin

    2014-01-01

    Malaysian ports’ container volumes are expected to increase to 36.6 million TEUs in 2020 compare to 12 million TEUs in 2005. Almost 45% of the container volumes are local containers entering the Malaysian hinterland. The hinterland container transport movements are dominated by road haulage (90%), alongside road-rail intermodal that currently handles the remaining 10%. The aim of this research is to develop possible strategies for improving the logistics of the intermodal hinterland container...

  3. A time-dependent vehicle routing problem in the service area of intermodal terminals

    OpenAIRE

    Braekers, K.; Caris, A.; Janssens, G.K.

    2013-01-01

    This paper deals with the operational planning of drayage operations in the service area of intermodal container terminals. Drayage operations refer to the full truckload container transpot activities that take place on a regional scale around these terminals. They involve the transport of loaded and empty containers between container terminals, container depots, consignees and shippers. Drayage operations are mostly performed by truck and constitute a large part of total costs of an intermo...

  4. An Efficient Genetic Algorithm to Solve the Intermodal Terminal Location problem

    Directory of Open Access Journals (Sweden)

    Mustapha Oudani

    2014-11-01

    Full Text Available The exponential growth of the flow of goods and passengers, fragility of certain products and the need for the optimization of transport costs impose on carriers to use more and more multimodal transport. In addition, the need for intermodal transport policy has been strongly driven by environmental concerns and to benefit from the combination of different modes of transport to cope with the increased economic competition. This research is mainly concerned with the Intermodal Terminal Location Problem introduced recently in scientific literature which consists to determine a set of potential sites to open and how to route requests to a set of customers through the network while minimizing the total cost of transportation. We begin by presenting a description of the problem. Then, we present a mathematical formulation of the problem and discuss the sense of its constraints. The objective function to minimize is the sum of road costs and railroad combined transportation costs. As the Intermodal Terminal Location Problemproblem is NP-hard, we propose an efficient real coded genetic algorithm for solving the problem. Our solutions are compared to CPLEX and also to the heuristics reported in the literature. Numerical results show that our approach outperforms the other approaches.

  5. Inter-modal Transportation of Spent Nuclear Fuel from Office of Civilian Radioactive Waste Management Sites

    International Nuclear Information System (INIS)

    Schmid, St.; Thrower, A.; Best, R.E.

    2009-01-01

    U.S. Department of Energy (DOE) plans to ship most commercial spent nuclear fuel (SNF) by rail in sealed transportation, aging and disposal (TAD) canisters. Based on current and projected dry SNF storage programs, DOE believes the majority of commercial nuclear sites would have the capacity to load and prepare large-capacity, canister-based dry storage canisters such as the proposed TAD systems. Thus, only a small fraction of SNF, such as odd lots and SNF not meeting TAD criteria, is projected for truck (highway) shipment. However, at some commercial facilities rail tracks do not extend to the site, or on-site rail does not extend to the site's proposed loading spot, and inter-modal transfers will be required. Advance coordination between DOE and commercial site operators, commercial carriers, specialized carriers and riggers, and state, tribal and local routing officials will be necessary to establish inter-modal transfer areas and obtain necessary permits to move heavy loads over highways. Although inter-modal transfers can involve a number of steps and several different entities acting in close coordination, such moves are commonly performed by industry and the system requirements are well-understood. (authors)

  6. Intramodality and intermodality agreement in radiography and computed tomography of equine distal limb fractures.

    Science.gov (United States)

    Crijns, C P; Martens, A; Bergman, H-J; van der Veen, H; Duchateau, L; van Bree, H J J; Gielen, I M V L

    2014-01-01

    Computed tomography (CT) is increasingly accessible in equine referral hospitals. To document the level of agreement within and between radiography and CT in characterising equine distal limb fractures. Retrospective descriptive study. Images from horses that underwent radiographic and CT evaluation for suspected distal limb fractures were reviewed, including 27 horses and 3 negative controls. Using Cohen's kappa and weighted kappa analysis, the level of agreement among 4 observers for a predefined set of diagnostic characteristics for radiography and CT separately and for the level of agreement between the 2 imaging modalities were documented. Both CT and radiography had very good intramodality agreement in identifying fractures, but intermodality agreement was lower. There was good intermodality and intramodality agreement for anatomical localisation and the identification of fracture displacement. Agreement for articular involvement, fracture comminution and fracture fragment number was towards the lower limit of good agreement. There was poor to fair intermodality agreement regarding fracture orientation, fracture width and coalescing cracks; intramodality agreement was higher for CT than for radiography for these features. Further studies, including comparisons with surgical and/or post mortem findings, are required to determine the sensitivity and specificity of CT and radiography in the diagnosis and characterisation of equine distal limb fractures. © 2013 EVJ Ltd.

  7. Quality management in intermodal terminals of the Brazilian grains logistics chain

    Directory of Open Access Journals (Sweden)

    Caroline Foscaches

    2016-09-01

    Full Text Available Intermodal terminals play a key role in the logistics system, since they are an important link between food production and distribution. In the agrifood chain, quality management isn´t seen as a competitive advantage, but as an issue of survival. This study thus aims to identify the quality management phase in which the intermodal terminals of the Brazilian grains logistics chain are found. To this end, interviews were conducted, using semi-structured questionnaires, with the managers of 28 intermodal terminals located in the Midwest, South, Southeast, Northeast and Northern regions. It was found that most terminals are in the Strategic Quality Management era, the fourth era of quality management. In addition, it was observed that the specific tools of the agrifood sector are widely used by terminals. In addition, many terminals use tools from the first and second quality era. Among the tools of the fourth era, product tracking is the most widely used. Finally, it was possible to determine that the terminals in the third quality era, Quality Assurance, have a higher average operating efficiency than terminals in the fourth era, Strategic Quality Management.

  8. The Malaysian Intermodal Terminal System: The Implication on the Malaysian Maritime Cluster

    Directory of Open Access Journals (Sweden)

    Mohamad Rosni Othman

    2016-06-01

    Full Text Available The maritime sector in Malaysia is best known globally due to the Straits of Malacca and being a nation surrounded by sea. Malaysia also has a substantial maritime industry consisting of numerous shipyards, ports and terminal faculties, ship services and a plethora of other companies and institutions with maritime oriented activities and become essential components of the Malaysia's maritime clusters. Issues such as underutilised intermodal terminals, uneven proportions in the freight transport infrastructure and road and seaport congestions prevent Malaysian seaports from achieving their full potential in serving their respective hinterlands. The key factors to improve Malaysian dry port or intermodal terminals are transport network; container planning; competition; location and, externalities. The paper does not only present the critical challenges faced by Malaysian intermodal terminals especially dry ports and the implications for seaport competency but it also provides strategies to utilise the Malaysian freight multimodal system to amplify seaports
tm performance in serving their hinterlands. As such, this may warrant policy makers to devise a comprehensive national master plan for the maritime sector in order for Malaysia to further develop her maritime industry and economies.

  9. Experimental generation of discrete ultraviolet wavelength by cascaded intermodal four-wave mixing in a multimode photonic crystal fiber.

    Science.gov (United States)

    Yuan, Jinhui; Kang, Zhe; Li, Feng; Zhang, Xianting; Mei, Chao; Zhou, Guiyao; Sang, Xinzhu; Wu, Qiang; Yan, Binbin; Zhou, Xian; Zhong, Kangping; Wang, Kuiru; Yu, Chongxiu; Farrell, Gerald; Lu, Chao; Tam, Hwa Yaw; Wai, P K A

    2017-09-15

    In this Letter, we demonstrate experimentally for the first time, to the best of our knowledge, discrete ultraviolet (UV) wavelength generation by cascaded intermodal FWM when femtosecond pump pulses at 800 nm are launched into the deeply normal dispersion region of the fundamental guided mode of a multimode photonic crystal fiber (MPCF). For pump pulses at average input powers of P av =450, 550, and 650 mW, the first anti-Stokes waves are generated at the visible wavelength of 538.1 nm through intermodal phase matching between the fundamental and second-order guided mode of the MPCF. The first anti-Stokes waves generated then serve as the secondary pump for the next intermodal FWM process. The second anti-Stokes waves in the form of the third-order guided mode are generated at the UV wavelength of 375.8 nm. The maximum output power is above 10 mW for P av =650  mW. We also confirm that the influences of fiber bending and intermodal walk-offs on the cascaded intermodal FWM-based frequency conversion process are negligible.

  10. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  11. EEG investigations of duration discrimination: the intermodal effect is induced by an attentional bias.

    Directory of Open Access Journals (Sweden)

    Emilie Gontier

    Full Text Available Previous studies indicated that empty time intervals are better discriminated in the auditory than in the visual modality, and when delimited by signals delivered from the same (intramodal intervals rather than from different sensory modalities (intermodal intervals. The present electrophysiological study was conducted to determine the mechanisms which modulated the performances in inter- and intramodal conditions. Participants were asked to categorise as short or long empty intervals marked by auditory (A and/or visual (V signals (intramodal intervals: AA, VV; intermodal intervals: AV, VA. Behavioural data revealed that the performances were higher for the AA intervals than for the three other intervals and lower for inter- compared to intramodal intervals. Electrophysiological results indicated that the CNV amplitude recorded at fronto-central electrodes increased significantly until the end of the presentation of the long intervals in the AA conditions, while no significant change in the time course of this component was observed for the other three modalities of presentation. They also indicated that the N1 and P2 amplitudes recorded after the presentation of the signals which delimited the beginning of the intervals were higher for the inter- (AV/VA compared to the intramodal intervals (AA/VV. The time course of the CNV revealed that the high performances observed with AA intervals would be related to the effectiveness of the neural mechanisms underlying the processing of the ongoing interval. The greater amplitude of the N1 and P2 components during the intermodal intervals suggests that the weak performances observed in these conditions would be caused by an attentional bias induced by the cognitive load and the necessity to switch between modalities.

  12. Intermodal transportation of low-level radioactive waste to the Nevada Test Site

    International Nuclear Information System (INIS)

    1998-09-01

    The Nevada Test Site (NTS) presently serves as a disposal site for low-level radioactive waste (LLW) generated by DOE-approved generators. The environmental impacts resulting from the disposal of LLW at the NTS are discussed in the Final Environmental Impact Statement (EIS) for the Nevada Test Site Off-Site Locations in the State of Nevada (NTS EIS). During the formal NTS EIS scoping period, it became clear that transportation of LLW was an issue that required attention. Therefore, the Nevada Transportation Protocol Working Group (TPWG) was formed in 1995 to identify, prioritize, and understand local issues and concerns associated with the transportation of LLW to the NTS. Currently, generators of LLW ship their waste to the NTS by legal-weight truck. In 1995, the TPWG suggested the DOE could reduce transportation costs and enhance public safety by using rail transportation. The DOE announced, in October 1996, that they would study the potential for intermodal transportation of LLW to the NTS, by transferring the LLW containers from rail cars to trucks for movements to the NTS. The TPWG and DOE/NV prepared the NTS Intermodal Transportation Facility Site and Routing Evaluation Study to present basic data and analyses on alternative rail-to-truck transfer sites and related truck routes for LLW shipments to the NTS. This Environmental Assessment (EA) identifies the potential environmental impacts and transportation risks of using new intermodal transfer sites and truck routes or continuing current operations to accomplish the objectives of minimizing radiological risk, enhancing safety, and reducing cost. DOE/NV will use the results of the assessment to decide whether or not to encourage the LLW generators and their transportation contractors to change their current operations to accomplish these objectives

  13. The coastal transportation in Brazil - potential for the improvement of aiming intermodality logistic flow

    Directory of Open Access Journals (Sweden)

    Delmo Alves Moura

    2011-06-01

    Full Text Available This study describes aspects related to coastal shipping in Brazil and its main actors and intermodal factors (road, rail, fluvial transportation etc. which corroborate to the increase of logistics competitiveness and efficiency of transportation in a large country like Brazil. The purpose of the study is bibliographic research on the topic, analyzing it inside the Brazilian scenario and also how it has been implemented in some countries. The objective of the study is also analyzing legislation which defines parameters to coastal shipping. This fact interferes directly with the logistics system and its intermodal aspects. If Brazil intends to reduce its logistics costs, coastal shipping should be an effective way to contribute to the Brazilian matrix of transport. Coastal shipping is supposed to bring competitive advantage and reduction of logistic costs. The conclusion is that integration is essential among the systems of domestic transportation and coastal shipping with its outstanding role in this environment, can contribute substantially to the Brazilian maritime industry.

  14. Phonological Contribution during Visual Word Recognition in Child Readers. An Intermodal Priming Study in Grades 3 and 5

    Science.gov (United States)

    Sauval, Karinne; Casalis, Séverine; Perre, Laetitia

    2017-01-01

    This study investigated the phonological contribution during visual word recognition in child readers as a function of general reading expertise (third and fifth grades) and specific word exposure (frequent and less-frequent words). An intermodal priming in lexical decision task was performed. Auditory primes (identical and unrelated) were used in…

  15. Primena SWOT analize na sistem integralnog transporta Vojske Srbije / SWOT analysis of the intermodal transportation system in the Army of Serbia

    Directory of Open Access Journals (Sweden)

    Dragan S. Pamučar

    2008-04-01

    Full Text Available U radu je prikazana primena SWOT analize na sistem integralnog transporta Vojske Srbije. Kao rezultat analize predstavljeni su ciljevi daljeg usavršavanja integralnog transporta, kao i mogući problemi generisani strateškim upravljanjem. / This work presents the SWOT analysis application to the intermodal transportation system in the Army of Serbia. The analysis resulted in defining goals for the future development of intermodal transportation, as well as possible problems generated by strategic management.

  16. Identification of key target markets for intermodal freight transport solutions in South Africa

    Directory of Open Access Journals (Sweden)

    Joubert van Eeden

    2010-11-01

    Full Text Available The Accelerated and Shared Growth Initiative for South Africa (AsgiSA identified South Africa's freight logistics challenges as among the key binding constraints on the country's growth aspirations. The research presented here points to the structural imbalance between road and rail freight transport as one of the key contributors to this state of affairs. Most long-distance corridor transport has been captured by road. However, long-distance transport is a market segment that is very suitable for intermodal transportation : rail is utilised for the high-density, long-distance component and road for the feeder and distribution services at the corridor end points. A market segmentation approach is developed to identify the corridors and industries that are natural candidates for such solutions, thereby paving the way for role-players and stakeholders to initiate a dialogue on the development of appropriate solutions.

  17. Photon-Pair Sources Based on Intermodal Four-Wave Mixing in Few-Mode Fibers

    Directory of Open Access Journals (Sweden)

    Karsten Rottwitt

    2018-05-01

    Full Text Available Four-wave mixing in optical fibers has been proven to have many applications within processing of classical optical signals. In addition, recent developments in multimode fibers have made it possible to achieve the necessary phase-matching for efficient four-wave mixing over a very wide bandwidth. Thus, the combination of multimode fiber optics and four-wave mixing is very attractive for various applications. This is especially the case for applications in quantum communication, for example in photon-pair generation. This is the subject of this work, where we discuss the impact of fluctuations in core radius on the quality of the heralded single-photon states and demonstrate experimental results of intermodal spontaneous four-wave mixing for photon-pair generation.

  18. Facial Expression and Vocal Pitch Height: Evidence of an Intermodal Association

    Directory of Open Access Journals (Sweden)

    David Huron

    2009-11-01

    Full Text Available Forty-four participants were asked to sing moderate, high, and low pitches while their faces were photographed. In a two-alternative forced choice task, independent judges selected the high-pitch faces as more friendly than the low-pitch faces. When photographs were cropped to show only the eye region, judges still rated the high-pitch faces friendlier than the low-pitch faces. These results are consistent with prior research showing that vocal pitch height is used to signal aggression (low pitch or appeasement (high pitch. An analysis of the facial features shows a strong correlation between eyebrow position and sung pitch—consistent with the role of eyebrows in signaling aggression and appeasement. Overall, the results are consistent with an inter-modal linkage between vocal and facial expressions.

  19. A chance-constrained stochastic approach to intermodal container routing problems.

    Science.gov (United States)

    Zhao, Yi; Liu, Ronghui; Zhang, Xi; Whiteing, Anthony

    2018-01-01

    We consider a container routing problem with stochastic time variables in a sea-rail intermodal transportation system. The problem is formulated as a binary integer chance-constrained programming model including stochastic travel times and stochastic transfer time, with the objective of minimising the expected total cost. Two chance constraints are proposed to ensure that the container service satisfies ship fulfilment and cargo on-time delivery with pre-specified probabilities. A hybrid heuristic algorithm is employed to solve the binary integer chance-constrained programming model. Two case studies are conducted to demonstrate the feasibility of the proposed model and to analyse the impact of stochastic variables and chance-constraints on the optimal solution and total cost.

  20. Perceptions of transport corridors and intermodal transport - as ways to control the space of freight transport flows

    DEFF Research Database (Denmark)

    Hansen, Leif Gjesing

    2009-01-01

    This paper presents empirical findings and results from a study conducted as a part of an INTERREG IIIB project on intermodal transport solutions and corridors in the North Sea Region (SUTRANET - Sustainable Transport Research & Development Network in the North Sea Region (Hansen et.al., 2007......; Kristiansen et.al., 2005 and http://www.sutranet.org/ ). The aim of the study has been to explore possibilities and barriers for the development of intermodal transport solutions in selected corridors in the North Sea Region. The North Sea Region is one among several regions appointed by the EU......-Commission to exemplify the operationalisation of the concept Motorways of the Sea (European Commission, 2004). The policies of promoting Motorways of the Sea is aiming at revitalise the short-sea-shipping within Europe as a transport industry, but also to relieve the heavily congested road network in central regions...

  1. A Study in Sea-Air Intermodal Port Selection: Strategic Decision Making for United States Southern Command

    Science.gov (United States)

    2011-06-01

    commerce ( B2B EC) and electronic data interchange (EDI) enabled by internet connectivity are leading the way in industry innovation. Business can profit...points. Companies like Bon-Ton Stores Inc. are rethinking their supply chains and are using intermodal for the first time ever. In this case, they...W. (1997). Strategic Decision Making: Multiobjective Decision Analysis with Spreadsheets. Belmont, CA: Wadsworth Publishing Company

  2. [Hydrotherapy equipment].

    Science.gov (United States)

    Tsibikov, V B; Ragozin, S I; Mikheeva, L V

    1985-01-01

    A flow-chart is developed demonstrating the relation between medical and prophylactic institutions within the organizational structure of the rehabilitation system and main types of rehabilitation procedures. In order to ascertain the priority in equipping rehabilitation services with adequate hardware the special priority criterion is introduced. The highest priority is assigned to balneotherapeutic and fangotherapeutic services. Based on the operation-by-operation analysis of clinical processes related to service and performance of balneologic procedures the preliminary set of clinical devices designed for baths, basins and showers in hospitals and rehabilitation departments is defined in a generalized form.

  3. Cryogenic equipment

    International Nuclear Information System (INIS)

    Leger, L.; Javellaud, J.; Caro, C.; Gilguy, R.; Testard, O.

    1966-06-01

    The cryostats presented here were built from standard parts; this makes it possible to construct a great variety of apparatus at minimum cost. The liquid nitrogen and helium reservoirs were designed so as to reduce losses to a minimum, and so as to make the cryostats as autonomous as possible. The experimental enclosure which is generally placed in the lower part of the apparatus requires a separate study in every case. Furthermore, complete assemblies such as transfer rods, isolated traps and high vacuum valves, were designed with a similar regard for the economic aspects and for the need for standardization. This equipment thus satisfies a great variety of experimental needs; it is readily adaptable and the consumptions of helium and liquid nitrogen are very low. (authors) [fr

  4. Dual Neutral Particle Beam Interrogation of Intermodal Shipping Containers for Special Nuclear Material

    Science.gov (United States)

    Keith, Rodney Lyman

    Intermodal shipping containers entering the United States provide an avenue to smuggle unsecured or stolen special nuclear material (SNM). The only direct method fielded to indicate the presence of SNM is by passive photon/neutron radiation detection. Active interrogation using neutral particle beams to induce fission in SNM is a method under consideration. One by-product of fission is the creation of fragments that undergo radioactive decay over a time period on the order of tens of seconds after the initial event. The "delayed" gamma-rays emitted from these fragments over this period are considered a hallmark for the presence of SNM. A fundamental model is developed using homogenized cargos with a SNM target embedded at the center and computationally interrogated using simultaneous neutron and photon beams. Findings from analysis of the delayed gamma emissions from these experiments are intended to mitigate the effects of poor quality information about the composition and disposition of suspect cargo before examination in an active interrogation portal.

  5. Intermodal safety research needs report of the sixth workshop on national transportation problems

    Energy Technology Data Exchange (ETDEWEB)

    Warshawer, A.J. (ed.)

    1976-04-01

    This conference brought together DOT policymakers, university principal investigators and other professionals to consider the intermodal safety research requirements of the Department of Transportation. The objectives of the conference were: (1) to highlight safety problems and needed transportation safety research identified by DOT modal safety managers and to stimulate university or university/industry teams to respond with research proposals which emphasize multi-modal applicability and a system view; and (2) to provide a forum for university research groups to inform DOT safety managers of promising new directions in transportation safety research and new tools with which to address safety related problems. The conference addressed the research requirements for safety as identified by the Statement of National Transportation Policy and by the modal safety managers in three principal contexts, each a workshop panel: I, Inter-Institutional Problems of Transportation Safety. Problems were described as: Federal-State, local; Federal-Industry; Federal-Public, Consumer groups. II, Goal Setting and Planning for Transportation Safety Programs. Issues were: modifying risk behavior, safety as a social value, and involving citizens in development of standards as a way of increasing probability of achieving program objectives. III, DOT Information, Management, and Evaluation Systems Requirements. Needs were: data requirements and analytic tools for management of safety programs.

  6. INTERMODAL TAŞIMACILIĞIN MALİYET AVANTAJLARI: KARAYOLU-DENİZYOLU ENTEGRASYONU ÜZERİNE BİR ARAŞTIRMA - COST BENEFITS OF INTERMODAL TRANSPORTATION: A RESEARCH ON ROAD AND MARITIME INTEGRATION

    Directory of Open Access Journals (Sweden)

    Mehmet Sıtkı SAYGILI

    2014-03-01

    Full Text Available ÖzetDünya üzerinde uluslararası ticaret her geçen gün gelişmektedir. Küresel pazarlardaki yoğun rekabet ortamında işletmeler kar marjlarını arttırmak için ticari bakış açılarında ve yöntemlerinde değişiklikler yapmaktadır. Toplam maliyetlerin düşürülmesi ve zaman faktörü açısından, günümüzde üreticiler tarafından lojistik hizmetlerin önemi daha iyi anlaşılmaktadır. Bu doğrultuda üreticilerin talepleri lojistik işletmelerinin operasyonlarına da etki etmektedir.Lojistik işletmelerinin müşterilerine rekabet avantajı oluşturacak bir taşıma fiyatı sunabilmesi için finansal durumlarını analiz etmeleri ve maliyetlerini kontrol altında tutmaları gerekmektedir. Taşıma maliyetlerinin düşürülmesi ile birlikte çevreye verilen zararın azaltılması için tüm taşıma türlerinin üstün yönlerinden yararlanarak birden fazla taşıma türünü bir araya getiren intermodal taşıma sistemi önem kazanmaktadır.Bu araştırma kapsamında öncelikle intermodal taşımacılıkla ilgili temel konular açıklanarak, taşıma türlerinin entegrasyonunda etkili olan etmeler ortaya konulmaktadır. Lojistik işletmelerinin maliyet yönetimi hakkında bilgi verilmektedir. Intermodal taşımacılıkta taşıma maliyetlerinin analizine yönelik karayolu taşımacılığına alternatif olarak karayolu-denizyolu entegrasyonu üzerine güzergah maliyetlerinin karşılaştırılması açısından örnek bir uygulama yapılmaktadır.AbstractInternational trade globally develops day by day. In highly competitive global markets, companies make changes in their trading perspectives and methods in order to increase their profit margin. Currently, suppliers recognize the importance of logistics services better in terms of diminishing total costs and time factor. In this sense, demands of suppliers also influence operations of logistics companies.Logistics companies are supposed to analyze their financial

  7. INTERMODAL TAŞIMACILIĞIN MALİYET AVANTAJLARI: KARAYOLU-DENİZYOLU ENTEGRASYONU ÜZERİNE BİR ARAŞTIRMA - COST BENEFITS OF INTERMODAL TRANSPORTATION: A RESEARCH ON ROAD AND MARITIME INTEGRATION

    Directory of Open Access Journals (Sweden)

    Mehmet Sıtkı SAYGILI

    2014-01-01

    Full Text Available ÖzetDünya üzerinde uluslararası ticaret her geçen gün gelişmektedir. Küresel pazarlardaki yoğun rekabet ortamında işletmeler kar marjlarını arttırmak için ticari bakış açılarında ve yöntemlerinde değişiklikler yapmaktadır. Toplam maliyetlerin düşürülmesi ve zaman faktörü açısından, günümüzde üreticiler tarafından lojistik hizmetlerin önemi daha iyi anlaşılmaktadır. Bu doğrultuda üreticilerin talepleri lojistik işletmelerinin operasyonlarına da etki etmektedir.Lojistik işletmelerinin müşterilerine rekabet avantajı oluşturacak bir taşıma fiyatı sunabilmesi için finansal durumlarını analiz etmeleri ve maliyetlerini kontrol altında tutmaları gerekmektedir. Taşıma maliyetlerinin düşürülmesi ile birlikte çevreye verilen zararın azaltılması için tüm taşıma türlerinin üstün yönlerinden yararlanarak birden fazla taşıma türünü bir araya getiren intermodal taşıma sistemi önem kazanmaktadır.Bu araştırma kapsamında öncelikle intermodal taşımacılıkla ilgili temel konular açıklanarak, taşıma türlerinin entegrasyonunda etkili olan etmeler ortaya konulmaktadır. Lojistik işletmelerinin maliyet yönetimi hakkında bilgi verilmektedir. Intermodal taşımacılıkta taşıma maliyetlerinin analizine yönelik karayolu taşımacılığına alternatif olarak karayolu-denizyolu entegrasyonu üzerine güzergah maliyetlerinin karşılaştırılması açısından örnek bir uygulama yapılmaktadır.AbstractInternational trade globally develops day by day. In highly competitive global markets, companies make changes in their trading perspectives and methods in order to increase their profit margin. Currently, suppliers recognize the importance of logistics services better in terms of diminishing total costs and time factor. In this sense, demands of suppliers also influence operations of logistics companies.Logistics companies are supposed to analyze their financial

  8. Environmental Factors and Intermodal Freight Transportation: Analysis of the Decision Bases in the Case of Spanish Motorways of the Sea

    Directory of Open Access Journals (Sweden)

    Miguel Ángel López-Navarro

    2014-03-01

    Full Text Available Today, there is widespread consensus about the notable, yet simultaneously growing, negative environmental impacts generated by the transportation sector. Experts working in a number of different fields consider the current situation to be unsustainable and possible measures to reduce emissions and foster sustainability are being encouraged. The European Commission has highlighted the need to shift away from unimodal road transport toward a greater use of intermodal transport through, for example, motorways of the sea, in light of the evidence that the former makes a significant contribution to increased CO2 emissions. However, although there is a general perception that sea transport is environmentally preferable to road transport, recent studies are beginning to question this assumption. Moreover, little research has been conducted to quantify environmental aspects and incorporate them into the decision-making processes involved in the modal shift. This study first reviews the existing literature to examine the extent to which environmental aspects are relevant in the modal choice in the case of short sea shipping and motorways of the sea. Related to this, the study also evaluates the role that different agents may play in making decisions about choice of mode, taking into consideration environmental aspects. Secondly, we use the values the European Commission provides to calculate external costs for the Marco Polo freight transport project proposals (call 2013 to estimate the environmental costs for several routes (a total of 72, comparing the use of road haulage with the intermodal option that incorporates the Spanish motorways of the sea. The results of this comparative analysis show that the intermodal option is not always the best choice in environmental terms. Consequently, the traditional environmental argument to justify this alternative must be used carefully.

  9. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  10. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  11. The Intermodal Bike: multi-modal integration of cycling mobility through product and process innovations in bicycle design.

    Science.gov (United States)

    Tosi, Francesca; Belli, Alessandro; Rinaldi, Alessandra; Tucci, Grazia

    2012-01-01

    The paper presents the early results of the UE-FP7 project "The Intermodal Bike". The research aim is to provide a super-compactable, super-lightweight folding bicycle as a realistic solution to graft the cycling mode onto the root of the public or private transportation systems. The folding bikes now on the international market reach weighs between 12-15 kg, with a variable footprint but occupying -when compacted- an average volume of about 100 liters. To encourage the use of this vehicle and to extend it to a larger number of users with different characteristics, the research project has set its goal in increasing as possible compactness and light weight, creating a bicycle with a volume when compacted of 20 liters (reduction factor =5), with a shape of 48 × 36 × 12 cm and a weight of 5 kg. max., ensuring stability and improving vehicle usability and efficiency, during the ride and in the phase of bike folding. To achieve this goal ergonomic and usability tests have been carried out. The tests allowed to find a posture that would ensure efficiency and comfort in the ride to as many users as possible. Parallel tests were made on the vehicle usability in the urban transport system and intermodal. The need for light weight has required special studies on the optimization of the vehicle's architecture and research on super-lightweight materials.

  12. Short-term forecasting of intermodal freight using ANNs and SVR: Case of the Port of Algeciras Bay

    Energy Technology Data Exchange (ETDEWEB)

    Moscoso Lopez, J.A.

    2016-07-01

    Forecasting of future intermodal traffic demand is very important for decision making in ports operations management. The use of accurate prediction tools is an issue that awakens a lot of interest among transport researchers. Intermodal freight forecasting plays an important role in ports management and in the planning of the principal port activities. Hence, the study is carried out under the motivation of knowing that modeling the freight transport flows could facilitate the management of the infrastructure and optimize the resources of the ports facilities. The use of advanced models for freight forecasting is essential to improve the port level-service and competitiveness. In this paper, two forecasting-models are presented and compared to predict the freight volume. The models developed and tested are based on Artificial Neural Networks and Support Vector Machines. Both techniques are based in a historical data and these methods forecast the daily weight of the freight with one week in advance. The performance of the models is evaluated on real data from Ro-Ro freight transport in the Port of Algeciras Bay. This work proposes and compares different approaches to determine the best prediction. In order to select the best model a multicomparison procedure is developed using several statistical test. The results of the assessed models show a promising tool to predict Ro-Ro transport flows with accuracy. (Author)

  13. Cost and time models for the evaluation of intermodal chains by using short sea shipping in the North Sea Region: the Rosyth-Zeebrugge route

    DEFF Research Database (Denmark)

    Lopez, Alba Martínez; Kronbak, Jacob; Jiang, Liping

    2015-01-01

    This paper is framed in the context of the EU Interreg IVB North Sea Region project Food Port. In line with this project, this paper aims to define mathematically cost and time models able to provide realistic information about the performances of road haulage and of intermodal chains using short...

  14. Service network design for an intermodal container network with flexible due dates/times and the possibility of using subcontracted transport

    NARCIS (Netherlands)

    B. van Riessen (Bart); R.R. Negenborn (Rudy); R. Dekker (Rommert); G. Lodewijks (Gabriel)

    2013-01-01

    textabstractAn intermodal container transportation network is being developed between Rotterdam and several inland terminals in North West Europe: the EUROPEAN GATEWAY SERVICES (EGS) network. This network is developed and operated by the seaports of EUROPE CONTAINER TERMINALS (ECT). To use this

  15. Identification of promising Twin Hub networks : Report of Work Package 1 of the Intermodal rail freight Twin hub Network Northwest Europe - project (final report)

    NARCIS (Netherlands)

    Kreutzberger, E.D.; Konings, J.W.; Meijer, S.; Witteveen, C.; Meijers, B.M.; Pekin, E.; Macharis, C.; Kiel, J.; Kawabata, Y.; Vos, W.

    2014-01-01

    This report is the first deliverable of the project Intermodal Rail Freight Twin Hub Network Northwest Europe. We call its subject Twin hub network and the organisational entity to carry out the actions the Twin hub project. The project is funded by INTERREG NWE (programme IVb). Its work started in

  16. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  17. Imaging of Herniated Discs of the Cervical Spine: Inter-Modality Differences between 64-Slice Multidetector CT and 1.5-T MRI

    Energy Technology Data Exchange (ETDEWEB)

    Yi, Ji Sook; Cha, Jang Gyu [Dept. of Radiology, Soonchunhyang University Bucheon Hospital, Bucheon (Korea, Republic of); Han, Jong Kyu [Dept. of Radiology, Soonchunhyang University Cheonan Hospital, Cheonan (Korea, Republic of); Kim, Hyun Joo [Dept. of Radiology, Soonchunhyang University Seoul Hospital, Seoul (Korea, Republic of)

    2015-08-15

    To assess inter-modality variability when evaluating cervical intervertebral disc herniation using 64-slice multidetector-row computed tomography (MDCT) and magnetic resonance imaging (MRI). Three musculoskeletal radiologists independently reviewed cervical spine 1.5-T MRI and 64-slice MDCT data on C2-3 though C6-7 of 51 patients in the context of intervertebral disc herniation. Interobserver and inter-modality agreements were expressed as unweighted kappa values. Weighted kappa statistics were used to assess the extents of agreement in terms of the number of involved segments (NIS) in disc herniation and epicenter measurements collected using MDCT and MRI. The interobserver agreement rates upon evaluation of disc morphology by the three radiologists were in fair to moderate agreement (k = 0.39-0.53 for MDCT images; k = 0.45-0.56 for MRIs). When the disc morphology was categorized into two and four grades, the inter-modality agreement rates were moderate (k-value, 0.59) and substantial (k-value, 0.66), respectively. The inter-modality agreements for evaluations of the NIS (k-value, 0.78) and the epicenter (k-value, 0.79) were substantial. Also, the interobserver agreements for the NIS (CT; k-value, 0.85 and MRI; k-value, 0.88) and epicenter (CT; k-value, 0.74 and MRI; k-value, 0.70) evaluations by two readers were substantial. MDCT tended to underestimate the extent of herniated disc lesions compared with MRI. Multidetector-row computed tomography and MRI showed a moderate-to-substantial degree of inter-modality agreement for the assessment of herniated cervical discs. MDCT images have a tendency to underestimate the anterior/posterior extent of the herniated disc compared with MRI.

  18. MRI morphologic alterations after liver SBRT. Direct dose correlation with intermodal matching

    Energy Technology Data Exchange (ETDEWEB)

    Boda-Heggemann, Judit; Jahnke, Anika; Jahnke, Lennart; Vogel, Lena; Simeonova-Chergou, Anna O.; Herskind, Carsten; Wenz, Frederik; Lohr, Frank [University of Heidelberg, Department of Radiation Oncology, University Medical Center Mannheim, Mannheim (Germany); Attenberger, Ulrike; Budjan, Johannes [University of Heidelberg, Department of Clinical Radiology and Nuclear Medicine, University Medical Center Mannheim, Mannheim (Germany)

    2016-09-15

    CT morphologic and histopathologic alterations have been reported after SBRT. We analyzed the correlation of MRI morphologic alterations with radiation doses to assess the potential for MRI-based dose-effect correlation in healthy liver tissue. MRI data of 24 patients with liver metastases 7±3 weeks after image-guided SBRT in deep-inspiration breath-hold were retrospectively analyzed. MRI images were intermodally matched to the planning CT and corresponding dose distribution. Absolute doses were converted to EQD{sub 2,α/β=x} with α/β values of 2, 3 for healthy liver tissue, 8 Gy for modelled predamaged liver tissue and 10 Gy for tumor tissue. A central nonenhancing area was observed within the isodose lines of nominally 48.2 ± 15.2 Gy, EQD{sub 2Gy/α/β=10} 92.5 ± 27.7 Gy. Contrast-enhancement around the central nonenhancing area was observed within the isodose lines of nominally 46.9 ± 15.3 Gy, EQD{sub 2Gy/α/β=10} 90.5 ± 28.3 Gy. Outside the high-dose volume, in the beam path, characteristic sharply defined, nonblurred MRI morphologic alterations were observed that corresponded with the following isodose lines: T1-intensity changes occurred at isodose lines of nominally 21.9 ± 6.7 Gy (EQD{sub 2,α/β=2} 42.5 ± 8.7 Gy, EQD{sub 2,α/β=3} 38.5 ± 7.6 Gy, EQD{sub 2,α/β=8} 30.2 ±6.3 Gy). T2-hyper/hypointensity was observed within isodose lines of nominally 22.4 ± 6.6 Gy (EQD{sub 2,α/β=2} 42.7 ± 8.1 Gy, EQD{sub 2,α/β=3} 38.7 ± 7 Gy; EQD{sub 2,α/β=8} 30.5 ± 5.9 Gy). Using deformable matching, direct spatial/dosimetric correlation of SBRT-induced changes in liver tissue was possible. In the PTV high-dose region, a central nonenhancing area and peripheral contrast medium accumulation was observed. Beam path doses of 38-42 Gy (EQD{sub 2,α/β=2-3}) induce characteristic MRI morphologic alterations. (orig.) [German] CT-morphologische Veraenderungen nach SBRT sind beschrieben und korrelieren mit histopathologischen Veraenderungen. Ziel war es, MRT

  19. Strategies and procedures for the development of intermodal freight transport in Europe: the role of motorways of the sea services and railway terminals

    OpenAIRE

    Lepori, Chiara

    2009-01-01

    Since the birth of the European Union on 1957, the development of a single market through the integration of national freight transport networks has been one of the most important points in the European Union agenda. Increasingly congested motorways, rising oil prices and concerns about environment and climate change require the optimization of transport systems and transport processes. The best solution should be the intermodal transport, in which the most efficient transport options are use...

  20. The Association between Intermodal (PM1-2.5) and PM1, PM2.5, Coarse Fraction and Meteorological Parameters in Various Environments in Central Europe.

    Czech Academy of Sciences Publication Activity Database

    Kozáková, Jana; Pokorná, P.; Černíková, A.; Hovorka, J.; Braniš, M.; Moravec, Pavel; Schwarz, Jaroslav

    2017-01-01

    Roč. 17, č. 5 (2017), s. 1234-1243 ISSN 1680-8584 R&D Projects: GA ČR(CZ) GBP503/12/G147 Institutional support: RVO:67985858 Keywords : intermodal fraction * personal cascade impactor sampler * PMx Subject RIV: DI - Air Pollution ; Quality OBOR OECD: Environmental sciences (social aspects to be 5.7) Impact factor: 2.606, year: 2016

  1. Study of the spectral width of intermode beats and optical spectrum of an actively mode-locked three-mirror semiconductor laser

    International Nuclear Information System (INIS)

    Zakharyash, Valerii F; Kashirsky, Aleksandr V; Klementyev, Vasilii M; Kuznetsov, Sergei A; Pivtsov, V S

    2005-01-01

    Various oscillation regimes of an actively mode-locked semiconductor laser are studied experimentally. Two types of regimes are found in which the minimal spectral width (∼3.5 kHz) of intermode beats is achieved. The width of the optical spectrum of modes is studied as a function of their locking and the feedback coefficients. The maximum width of the spectrum is ∼3.7 THz. (control of laser radiation parameters)

  2. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  3. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  4. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  5. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  6. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  7. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  8. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  9. Vulnerability effects of passengers' intermodal transfer distance preference and subway expansion on complementary urban public transportation systems

    International Nuclear Information System (INIS)

    Hong, Liu; Yan, Yongze; Ouyang, Min; Tian, Hui; He, Xiaozheng

    2017-01-01

    The vulnerability studies on urban public transportation systems have attracted growing attentions in recent years, due to their important role in the economy development of a city and the well-beings of its citizens. This paper proposes a vulnerability model of complementary urban public transportation systems (CUPTSs) composed of bus systems and subway systems, with the consideration of passengers’ intermodal transfer distance preference (PITDP) to capture different levels of complementary strength between the two systems. Based on the model, this paper further introduces a CUPTSs-aimed vulnerability analysis method from two specific aspects: (a) vulnerability effects of different PITDP values, which facilitate the design of policies to change PITDP to reduce system vulnerability; (b) vulnerability effects of different subway expansion plans, which facilitate the vulnerability investigation of current expansion plan and the identification of the optimal expansion plan from the system vulnerability perspective. The proposed CUPTSs-aimed vulnerability analysis method is applied to investigate the complementary bus and subway systems in the city of Wuhan, China. The insights from this study are helpful to analyze other CUPTSs for valuable planning suggestions from the vulnerability perspective. - Highlights: • We model complementary urban public transportation systems’ (CUPTSs) vulnerability. • We use a PITDP metric to capture different levels of complementary relationship. • We study vulnerability under different PITDP and different subway expansion plans. • We analyze dynamic vulnerability of CUPTSs during their expansion process.

  10. Deep-sea faunal communities associated with a lost intermodal shipping container in the Monterey Bay National Marine Sanctuary, CA.

    Science.gov (United States)

    Taylor, Josi R; DeVogelaere, Andrew P; Burton, Erica J; Frey, Oren; Lundsten, Lonny; Kuhnz, Linda A; Whaling, P J; Lovera, Christopher; Buck, Kurt R; Barry, James P

    2014-06-15

    Carrying assorted cargo and covered with paints of varying toxicity, lost intermodal containers may take centuries to degrade on the deep seafloor. In June 2004, scientists from Monterey Bay Aquarium Research Institute (MBARI) discovered a recently lost container during a Remotely Operated Vehicle (ROV) dive on a sediment-covered seabed at 1281 m depth in Monterey Bay National Marine Sanctuary (MBNMS). The site was revisited by ROV in March 2011. Analyses of sediment samples and high-definition video indicate that faunal assemblages on the container's exterior and the seabed within 10 m of the container differed significantly from those up to 500 m. The container surface provides hard substratum for colonization by taxa typically found in rocky habitats. However, some key taxa that dominate rocky areas were absent or rare on the container, perhaps related to its potential toxicity or limited time for colonization and growth. Ecological effects appear to be restricted to the container surface and the benthos within ∼10 m. Copyright © 2014 The Authors. Published by Elsevier Ltd.. All rights reserved.

  11. Effects of intermode nonlinearity and intramode nonlinearity on modulation instability in randomly birefringent two-mode optical fibers

    Science.gov (United States)

    Li, Jin Hua; Xu, Hui; Sun, Ting Ting; Pei, Shi Xin; Ren, Hai Dong

    2018-05-01

    We analyze in detail the effects of the intermode nonlinearity (IEMN) and intramode nonlinearity (IRMN) on modulation instability (MI) in randomly birefringent two-mode optical fibers (RB-TMFs). In the anomalous dispersion regime, the MI gain enhances significantly as the IEMN and IRMN coefficients increases. In the normal dispersion regime, MI can be generated without the differential mode group delay (DMGD) effect, as long as the IEMN coefficient between two distinct modes is above a critical value, or the IRMN coefficient inside a mode is below a critical value. This critical IEMN (IRMN) coefficient depends strongly on the given IRMN (IEMN) coefficient and DMGD for a given nonlinear RB-TMF structure, and is independent on the input total power, the power ratio distribution and the group velocity dispersion (GVD) ratio between the two modes. On the other hand, in contrast to the MI band arising from the pure effect of DMGD in the normal dispersion regime, where MI vanishes after a critical total power, the generated MI band under the combined effects of IEMN and IRMN without DMGD exists for any total power and enhances with the total power. The MI analysis is verified numerically by launching perturbed continuous waves (CWs) with wave propagation method.

  12. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  13. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  14. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  15. Intermodal Transport and Repositioning of Empty Containers in Central and Eastern Europe Hinterland

    DEFF Research Database (Denmark)

    Kolar, Petr; Schramm, Hans-Joachim; Prockl, Günter

    2018-01-01

    The objective of this article is to provide a review of literature dealing with empty container repositioning. This review is interlinked with a qualitative data analysis based on semi-structured interviews with representatives of ocean carriers, which are key actors determining empty container....... By addressing the research questions and conducting the analysis, the authors determine whether empty container repositioning is a problem only concerning equipment allocation by an ocean carrier or requires a collaborative resolution involving various parties engaged in container movements in landlocked...... hinterlands. This article confirms that most existing literature dealing with empty container repositioning ignores the actual dynamics of landlocked hinterlands as well as business practitioners' perspective. The authors' analysis of the empirical research complements and challenges the reviewed research...

  16. Cooling of electronic equipment

    DEFF Research Database (Denmark)

    A. Kristensen, Anders Schmidt

    2003-01-01

    Cooling of electronic equipment is studied. The design size of electronic equipment decrease causing the thermal density to increase. This affect the cooling which can cause for example failures of critical components due to overheating or thermal induced stresses. Initially a pin fin heat sink...

  17. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  18. LA REORDENACIÓN DEL SISTEMA DE TRANSPORTE PÚBLICO ANTE EVENTOS ESPECIALES, UN EJERCICIO PRÁCTICO DE COORDINACIÓN INTERMODAL

    OpenAIRE

    Galindo González, Pedro; Blanco Caballero, Nuria; Moreno Muñoz, Carmen; Chico González, Alejandro

    2016-01-01

    [ES] El Consorcio Regional de Transportes de Madrid (CRTM), como autoridad de transporte público de la región, coordina los más de 40 operadores públicos y privados para dar una respuesta óptima a las necesidades de movilidad de los ciudadanos. El transporte público en la Comunidad de Madrid constituye un sistema complejo de carácter intermodal, en el que operan modos de transporte urbanos e interurbanos, conectados mediante un conjunto de intercambiadores o áreas intermodales ...

  19. HVAC systems and equipment

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, S.T. (Linford Air and Refrigeration Company, Oakland, CA (US))

    1990-02-01

    The author discusses the section of the ASHRAE Standard 90.1-1989 which addresses HVAC systems and equipment. New features of HVAC systems mandatory general requirements are described. New prescriptive requirements are detailed.

  20. Personal Protective Equipment

    National Research Council Canada - National Science Library

    1998-01-01

    ... of personal protective equipment A safety program for new employees is a necessary part of any orientation program An on-going safety program should be used to motivate employees to continue to use...

  1. Electronic equipment packaging technology

    CERN Document Server

    Ginsberg, Gerald L

    1992-01-01

    The last twenty years have seen major advances in the electronics industry. Perhaps the most significant aspect of these advances has been the significant role that electronic equipment plays in almost all product markets. Even though electronic equipment is used in a broad base of applications, many future applications have yet to be conceived. This versatility of electron­ ics has been brought about primarily by the significant advances that have been made in integrated circuit technology. The electronic product user is rarely aware of the integrated circuits within the equipment. However, the user is often very aware of the size, weight, mod­ ularity, maintainability, aesthetics, and human interface features of the product. In fact, these are aspects of the products that often are instrumental in deter­ mining its success or failure in the marketplace. Optimizing these and other product features is the primary role of Electronic Equipment Packaging Technology. As the electronics industry continues to pr...

  2. CV equipment responsibilities

    CERN Document Server

    Pirollet, B

    2008-01-01

    This document describes the limits of the responsibilities of the TS/CV for fire fighting equipment at the LHC. The various interfaces, providers and users of the water supply systems and clean water raising systems are described.

  3. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  4. Tradução intermodal, intersemiótica e interlinguística de textos escritos em Português para a Libras oral

    Directory of Open Access Journals (Sweden)

    Ronice Müller de Quadros

    2015-10-01

    Full Text Available http://dx.doi.org/10.5007/2175-7968.2015v35nesp2p354 Neste artigo apresentamos alguns tipos de tradução envolvidos na tradução de textos em português para a língua brasileira de sinais (Libras.  Discutimos esses diferentes tipos e destacamos a tradução intermodal, específica das traduções que envolvem uma língua de sinais. A tradução intermodal trata de aspectos visuais e operacionais implicados na tradução para Libras em forma de vídeo e aspectos linguísticos essencialmente visuais-espaciais que envolvem o uso do espaço em línguas de modalidade visual-espacial, ou seja, línguas de sinais. Neste artigo, apresentamos uma análise das implicações da modalidade a partir de exemplos de tradução realizados no contexto do Curso de Letras Libras da Universidade Federal de Santa Catarina (UFSC.

  5. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  6. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  7. Radioactive decontamination of equipment

    International Nuclear Information System (INIS)

    1982-03-01

    After a recall of some definitions relating to decontamination techniques and of the regulation into effect, the principles to be respected to arrange rationally work zones are quoted while insisting more particularly on the types of coatings which facilitate maintenance operations and the dismantling of these installations. Then, the processes and equipments to use in decontamination units for routine or particular operations are described; the list of recommended chemical products to decontaminate the equipment is given. The influence of these treatments on the state and the duration of life of equipments is studied, and some perfectible methods are quoted. In the appendix, are given: the limits of surface contamination accepted in the centers; a standard project which defines the criteria of admissible residual contamination in wastes considered as cold wastes; some remarks on the interest that certain special ventilation and air curtain devices for the protection of operators working on apparatus generating contaminated dusts [fr

  8. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  9. Charging equipment. Ladegeraet

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, E

    1981-09-17

    The invention refers to a charging equipment, particularly on board charging equipment for charging traction batteries of an electric vehicle from the AC mains supply, consisting of a DC converter, which contains a controlled power transistor, a switching off unloading circuit and a power transmitter, where the secondary winding is connected in series with a rectifier diode, and a smoothing capacitor is connected in parallel with this series circuit. A converter module is provided, which consists of two DC voltage converters, whose power transistors are controlled by a control circuit in opposition with a phase displacement of 180/sup 0/.

  10. Experimental equipment, ch. 6

    International Nuclear Information System (INIS)

    Boomstra, F.; Hoogenboom, A.M.; Prins, C.M.; Strasters, B.A.; Vermeer, A.; Wit, P. de; Zwol, N.A. van.

    1977-01-01

    The experimental equipment in use at Utrecht university is discussed. Attention is paid to the tandem Van de Graaff accelerator and the 4MV and 1MV accelerators. The detection systems for gamma-ray spectroscopy are reviewed with emphasis on the compton-suppression spectrometer. The data-handling system used for experiments with the tandem is also briefly discussed

  11. Equipment gift to Monaco

    International Nuclear Information System (INIS)

    1970-01-01

    Research work at the Agency's Laboratory of Marine Radioactivity in Monaco, including that concerned with pollution of the sea, has been made more effective by its latest acquisition of equipment. This is a spectrophotometer donated by the Federal Republic of Germany. (author)

  12. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  13. Safeguards techniques and equipment

    International Nuclear Information System (INIS)

    1997-01-01

    The current booklet is intended to give a full and balanced description of the techniques and equipment used for both nuclear material accountancy and containment and surveillance measures, and for the new safeguards measure of environmental sampling. As new verification measures continue to be developed, the material in the booklet will be periodically reviewed and updated versions issued. (author)

  14. Equipping tomorrow's fire manager

    Science.gov (United States)

    Christopher A. Dicus

    2008-01-01

    Fire managers are challenged with an ever-increasing array of both responsibilities and critics. As in the past, fire managers must master the elements of fire behavior and ecology using the latest technologies. In addition, today’s managers must be equipped with the skills necessary to understand and liaise with a burgeoning group of vocal stakeholders while also...

  15. Electrical equipment design library

    International Nuclear Information System (INIS)

    1994-01-01

    This book guides the design supervision, construction order for electrical equipment. The contents of this library are let's use electricity like this, leading-in-pole and casual power, electric pole install below 300KVA, electric pole install below 301∼1000KVA, electric pole install exceed 1000KVA, rooftop install exceed 1000KVA, CUBICLE type, 154KV services. It adds an appendix.

  16. Orphee reactor experimental equipment

    International Nuclear Information System (INIS)

    1987-01-01

    Experimental equipment around the ORPHEE reactor is presented. The neutron source; and the spectrometers and sample environment (inelastic and quasi-elastic scattering, elastic scattering, spread scattering, small angle scattering) are described. An experiment proposal and reports guide is supplied [fr

  17. Seismic qualification of equipment

    International Nuclear Information System (INIS)

    Heidebrecht, A.C.; Tso, W.K.

    1983-03-01

    This report describes the results of an investigation into the seismic qualification of equipment located in CANDU nuclear power plants. It is particularly concerned with the evaluation of current seismic qualification requirements, the development of a suitable methodology for the seismic qualification of safety systems, and the evaluation of seismic qualification analysis and testing procedures

  18. Underground coal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Chadwick, J.

    2002-12-01

    This paper reports on increasing automation and enhanced productivity on longwalls, new development cutting and bolting technologies and haulage systems. Amongst equipment discussed is DBT's Electra series EL3000 shearer, the Dosco LH1400 roadheader with onboard bolters, and Joy 12 CM30 continuous miners. 4 photos.

  19. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  20. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  1. Equipment cost optimization

    International Nuclear Information System (INIS)

    Ribeiro, E.M.; Farias, M.A.; Dreyer, S.R.B.

    1995-01-01

    Considering the importance of the cost of material and equipment in the overall cost profile of an oil company, which in the case of Petrobras, represents approximately 23% of the total operational cost or 10% of the sales, an organization for the optimization of such costs has been established within Petrobras. Programs are developed aiming at: optimization of life-cycle cost of material and equipment; optimization of industrial processes costs through material development. This paper describes the methodology used in the management of the development programs and presents some examples of concluded and ongoing programs, which are conducted in permanent cooperation with suppliers, technical laboratories and research institutions and have been showing relevant results

  2. X-ray equipment

    International Nuclear Information System (INIS)

    Redmayne, I.G.B.

    1988-01-01

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.)

  3. X-ray equipment

    Energy Technology Data Exchange (ETDEWEB)

    Redmayne, I.G.B.

    1988-01-06

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.).

  4. Tube for irradiation equipment

    International Nuclear Information System (INIS)

    Goehrich, K.; Vogt, H.

    1979-01-01

    This patent describes a tube for irradiation equipment for limiting an emergent beam, with a baseplate, possessing a central aperture, intended for attaching to the equipment, as well as four carrier plates, each of which possesses a limiting edge and a sliding edge located at right angles thereto. The carrier plates are located parallel to the baseplate, the limiting edge of each carrier plate resting against the sliding edge of the adjacent carrier plate and each of the two mutually opposite pairs of carrier plates being displaceable, parallel to the direction of its sliding edges and symmetrically to the center of the transmission aperture, for the purpose of continuously varying the transmission aperture defined by the limiting edges, during which displacement each of the displaced carrier plates carries with it the carrier plate, resting against the limiting edge of the former plate, parallel to the direction of the limiting edge of the latter plate. 8 claims

  5. Equipment for isotope diagnostics

    International Nuclear Information System (INIS)

    Platz, W.

    1976-01-01

    The invention concerns an improvement of equipment for isotope diagnostics allowing to mark special intensity ranges of the recorded measurements by means of different colors. For undisturbed operation it is of advantage to avoid electric circuits between movable and unmovable parts of the color recorder. According to the invention, long gear wheels of glass fiber-reinforced polyamide are used for these connections. (ORU) [de

  6. Soviet equipment flies in

    CERN Multimedia

    CERN PhotoLab

    1978-01-01

    End of February 1977 a Soviet Ilyushin-76 heavy freight aircraft landed at Cointrin airport having on board fifty large wire proprtional chambers and associated apparatus, together weighing 10 tons, supplied by the Joint Institute for Nuclear Research, Dubna, USSR. The equipment was for the CERN- Dubna-Munich-Saclay experiment NA4 on deep inelastic muon scattering being set up in the North Area of SPS. See Weekly Bulletin 11/78.

  7. Labelling of equipment dispensers.

    Science.gov (United States)

    Gray, D C

    1993-01-01

    A new labelling system for use on medical equipment dispensers is tested. This system uses one of the objects stored in each unit of the dispenser as the 'label', by attaching it to the front of the dispenser with tape. The new system was compared to conventional written labelling by timing subjects asked to select items from two dispensers. The new system was 27% quicker than the conventional system. Images Fig. 1 PMID:8110335

  8. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  9. Personal protective equipment

    International Nuclear Information System (INIS)

    2004-01-01

    This Practical Radiation Technical Manual is one of a series that has been designed to provide guidance on radiological protection for employers, radiation protection officers, managers and other technically competent persons who have responsibility for ensuring the safety of employees working with ionizing radiation. The Manual may be used with the appropriate IAEA Practical Radiation Safety Manuals to provide training, instruction and information for all employees engaged in work with ionizing radiation. Personal protective equipment (PPE) includes clothing or other special equipment that is issued to individual workers to provide protection against actual or potential exposure to ionizing radiations. It is used to protect each worker against the prevailing risk of external or internal exposure in circumstances in which it is not reasonably practicable to provide complete protection by means of engineering controls or administrative methods. Adequate personal protection depends on PPE being correctly selected, fitted and maintained. Appropriate training for the users and arrangements to monitor usage are also necessary to ensure that PPE provides the intended degree of protection effectively. This Manual explains the principal types of PPE, including protective clothing and respiratory protective equipment (RPE). Examples of working procedures are also described to indicate how PPE should be used within a safe system of work. The Manual will be of most benefit if it forms part of a more comprehensive training programme or is supplemented by the advice of a qualified expert in radiation protection. Some of the RPE described in this Manual should be used under the guidance of a qualified expert

  10. Interobserver and intermodality variability in GTV delineation on simulation CT, FDG-PET, and MR Images of Head and Neck Cancer.

    Science.gov (United States)

    Anderson, Carryn M; Sun, Wenqing; Buatti, John M; Maley, Joan E; Policeni, Bruno; Mott, Sarah L; Bayouth, John E

    2014-09-01

    To compare the interobserver and intermodality differences in image-based identification of head and neck primary site gross tumor volumes (GTV). Modalities compared include: contrast-enhanced CT, F-18 fluorodeoxyglucose positron emission tomography (PET/CT) and contrast-enhanced MRI. Fourteen patients were simulated after immobilization for all 3 imaging modalities (CT, PET/CT, MRI). Three radiation oncologists (RO) contoured GTVs as seen on each modality. The GTV was contoured first on the contrast-enhanced CT (considered the standard), then on PET/CT, and finally on post-contrast T1 MRI. Interobserver and intermodality variability were analyzed by volume, intersection, union, and volume overlap ratio (VOR). Analysis of RO contours revealed the average volume for CT-, PET/CT-, and MRI-derived GTVs were 45cc, 35cc and 49cc, respectively. In 93% of cases PET/CT-derived GTVs had the smallest volume and in 57% of cases MRI-derived GTVs had the largest volume. CT showed the largest variation in target definition (standard deviation amongst observers 35%) compared to PET/CT (28%) and MRI (27%). The VOR was largest (indicating greatest interobserver agreement) in PET/CT (46%), followed by MRI (36%), followed by CT (34%). For each observer, the least agreement in GTV definition occurred between MRI & PET/CT (average VOR = 41%), compared to CT & PET/CT (48%) and CT & MRI (47%). A nonsignificant interobserver difference in GTVs for each modality was seen. Among three modalities, CT was least consistent, while PET/CT-derived GTVs had the smallest volumes and were most consistent. MRI combined with PET/CT provided the least agreement in GTVs generated. The significance of these differences for head & neck cancer is important to explore as we move to volume-based treatment planning based on multi-modality imaging as a standard method for treatment delivery.

  11. Scientific Equipment Division - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2001-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: - designing of devices and equipment for experiments in physics, their mechanical construction and assembly. In particular, there are vacuum chambers and installations for HV and UHV; - maintenance and upgrading of the existing installations and equipment in our Institute; - participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and a AO plotter, what allows us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. It offers the following possibilities: - turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc-type elements of a diameter up to 600 mm and a length not exceeding 300 mm; - milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm; - grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm; - drilling - holes of a diameter up to 50 mm; - welding - electrical and gas welding, including TIG vacuum-tight welding; - soft and hard soldering; - mechanical works including precision engineering; - plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides; - painting - paint spraying with possibility of using furnace-fred drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop posses CNC milling machine which can be used for machining of work-pieces up to 500 kg

  12. Mining face equipment

    Energy Technology Data Exchange (ETDEWEB)

    G, Litvinskiy G; Babyuk, G V; Yakovenko, V A

    1981-01-07

    Mining face equipment includes drilling advance wells, drilling using explosives on the contour bore holes, loading and transporting the crushed mass, drilling reinforcement shafts, injecting reinforcement compounds and moving the timber. Camouflet explosives are used to form relaxed rock stress beyond the mining area to decrease costs of reinforcing the mining area by using nonstressed rock in the advance well as support. The strengthening solution is injected through advanced cementing wells before drilling the contour bores as well as through radial cementing wells beyond the timbers following loading and transport of the mining debris. The advance well is 50-80 m.

  13. Coal ash monitoring equipment

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, C G; Wormald, M R

    1978-10-02

    The monitoring equipment is used to determine the remainder from combustion (ash slack) of coal in wagons designed for power stations. Next to the rails, a neutron source (252 Cf, 241 Am/Be) is situated, which irradiates the coal with neutrons at a known dose, which produces the reaction 27 Al (n ..gamma..) Al 28. The aluminium content is a measure of the remainder. The 1.78 MeV energy is measured downstream of the rail with a detector. The neutron source can only act in the working position of a loaded wagon.

  14. Management of Transportation Equipment.

    Science.gov (United States)

    1982-11-01

    Record% % %. "jP -M -. M LIh TRANSPORTATION MAENTKENAI4CE SHOP WORKLOAD CONTROL WORK CENTER SADR A-OR .a’* tLR 4.,R53 8114LM 0 o 251 50 75 100 125 ISO ...PDBP 06 7 4892 TRACTOR, WHEEL, INDUST, 14001-20000 PDBP 06 7 4893 TRACTOR, WHEEL, INDUST, 20001-27000 PDBP 06 7 4894 TRACTOR, WHEEL, INDUST, 27001 PDBP...27K TRACTOR, WHEEL, INDUST, 27001 PDBP & UP P-i LINE ITEM 07 LIGHTING AND POWER GENERATION EQUIPMENT 5110 T FLOODLIGHT ELEC FLOODLIGHT, ELEC, TRUCK

  15. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  16. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  17. Coal mining equipment

    International Nuclear Information System (INIS)

    Stein, R.R.; Martin, T.W.

    1991-01-01

    The word in longwall components is big, and these larger components have price tags to match. The logic behind the greater investment is that it will yield high production rates and good uptime statistics. This is true in most cases. More important than single-shift tonnage records, average shift production continues to climb upwards. This paper reports on the quality, and more significantly, the quantity of service supplied for long-wall equipment, which has reached levels that would have been seen as unachievable when longwall mining was first introduced in the U.S. The school of thought then was that longwall would increase productivity in part by reducing the number of production units and thus reducing the number of personnel employed underground. The expectation of fewer employees turned out to be unrealistic. That was probably one reason that some early attempts to install longwall system looked more like failures than vision of the future

  18. Reactor fuel charging equipment

    International Nuclear Information System (INIS)

    Wade, Elman.

    1977-01-01

    In many types of reactor fuel charging equipment, tongs or a grab, attached to a trolley, housed in a guide duct, can be used for withdrawing from the core a selected spent fuel assembly or to place a new fuel assembly in the core. In these facilities, the trolley may have wheels that roll on rails in the guide duct. This ensures the correct alignment of the grab, the trolley and fuel assembly when this fuel assembly is being moved. By raising or lowering such a fuel assembly, the trolley can be immerged in the coolant bath of the reactor, whereas at other times it can be at a certain level above the upper surface of the coolant bath. The main object of the invention is to create a fuel handling apparatus for a sodium cooled reactor with bearings lubricated by the sodium coolant and in which the contamination of these bearings is prevented [fr

  19. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  20. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  1. 21 CFR 866.4540 - Immunonephelometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4540 Immunonephelometer equipment. (a) Identification. Immunonephelometer equipment for clinical use...

  2. 21 CFR 866.4520 - Immunofluorometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4520 Immunofluorometer equipment. (a) Identification. Immunofluorometer equipment for clinical use with...

  3. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  4. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  5. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  6. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  7. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  8. Cryogenic equipment; Materiel cryogenique

    Energy Technology Data Exchange (ETDEWEB)

    Leger, L; Javellaud, J; Caro, C; Gilguy, R; Testard, O

    1966-06-01

    The cryostats presented here were built from standard parts; this makes it possible to construct a great variety of apparatus at minimum cost. The liquid nitrogen and helium reservoirs were designed so as to reduce losses to a minimum, and so as to make the cryostats as autonomous as possible. The experimental enclosure which is generally placed in the lower part of the apparatus requires a separate study in every case. Furthermore, complete assemblies such as transfer rods, isolated traps and high vacuum valves, were designed with a similar regard for the economic aspects and for the need for standardization. This equipment thus satisfies a great variety of experimental needs; it is readily adaptable and the consumptions of helium and liquid nitrogen are very low. (authors) [French] De nombreuses experiences utilisant les basses temperatures, necessitent l'emploi d'un materiel cryogenique complexe n'existant pas dans le commerce. Les cryostats presentes ici ont ete realises a partir d'elements standard, ce qui permet, malgre la diversite des appareils, de realiser un ensemble a moindre frais. Les reservoirs d'azote et d'helium liquides ont ete concus de facon a limiter les pertes et a conferer au cryostat la plus grande autonomie possible. L'enceinte experimentale situee en general dans la partie inferieure de l'appareil necessite dans tous les cas une etude speciale. D'autre part des ensembles complets tels que les cannes de transfert, piege isole, robinet pour vide secondaire, ont ete concus dans le meme souci de rentabilite et de standardisation. Ce materiel peut donc repondre a un grand nombre d'exigences experimentales, il est facilement adaptable, et les consommations d'helium et d'azote liquide sont tres reduites. (auteurs)

  9. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment that are not covered with insulating protective equipment. (c) Derrick trucks, cranes and other lifting equipment. (1) All derrick trucks, cranes and other lifting equipment shall comply with subpart N...

  10. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  11. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  12. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  13. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  14. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  15. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  16. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  17. MAINTAINING ACCESS TO AMERICA'S INTERMODAL PORTS/TECHNOLOGIES FOR DECONTAMINATION OF DREDGED SEDIMENT: NEW YORK/NEW JERSEY HARBOR.

    Energy Technology Data Exchange (ETDEWEB)

    STERN,E.A.; JONES,K.; DONATO,K.; PAULING,J.D.; SONTAG,J.G.; CLESCERI,N.L.; MENSINGER,M.C.; WILDE,C.L.

    1998-05-01

    One of the greatest drivers for maintaining access to America's Intermodal ports and related infrastructure redevelopment efforts over the next several years will be the control and treatment of contaminated sediments dredged from our nation's waterways. More than 306 million cubic meters (m{sup 3}) (400 million cubic yards [cy]) of sediments are dredged annually from U.S. waterways, and each year close to 46 million m{sup 3} (60 million cy) of this material is disposed of in the ocean (EPA 842-F-96-003). The need to protect our environment against undesirable effects from sediment dredging and disposal practices is gaining increased attention from the public and governmental agencies. Meeting this need is a challenging task not only from the standpoint of solving formidable scientific and engineering problems, but also, and more importantly, from the need to implement complex collaborations among the many different parties concerned with the problem. Some 40 years ago, C.P. Snow pointed out the problems involved in communicating between the two cultures of the sciences and the humanities (Snow, 1993). Today, it is necessary to extend Snow's concept to a multicultural realm with groups that include governmental, industrial, environmental, academic, and the general public communicating in different languages based on widely different fundamental assumptions.

  18. Interwoven fluctuations during intermodal perception: fractality in head sway supports the use of visual feedback in haptic perceptual judgments by manual wielding.

    Science.gov (United States)

    Kelty-Stephen, Damian G; Dixon, James A

    2014-12-01

    Intermodal integration required for perceptual learning tasks is rife with individual differences. Participants vary in how they use perceptual information to one modality. One participant alone might change her own response over time. Participants vary further in their use of feedback through one modality to inform another modality. Two experiments test the general hypothesis that perceptual-motor fluctuations reveal both information use within modality and coordination among modalities. Experiment 1 focuses on perceptual learning in dynamic touch, in which participants use exploratory hand-wielding of unseen objects to make visually guided length judgments and use visual feedback to rescale their judgments of the same mechanical information. Previous research found that the degree of fractal temporal scaling (i.e., "fractality") in hand-wielding moderates the use of mechanical information. Experiment 1 shows that head-sway fractality moderates the use of visual information. Further, experience with feedback increases head-sway fractality and prolongs its effect on later hand-wielding fractality. Experiment 2 replicates effects of head-sway fractality moderating use of visual information in a purely visual-judgment task. Together, these findings suggest that fractal fluctuations may provide a modal-general window onto not just how participants use perceptual information but also how well they may integrate information among different modalities. PsycINFO Database Record (c) 2014 APA, all rights reserved.

  19. Food Service Equipment and Appurtenances.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  20. Equipe de trabalho

    Directory of Open Access Journals (Sweden)

    Gabriel Gerber Hornink

    2014-08-01

    Full Text Available   Equipe de Trabalho 2014 1. Equipe editorial Editor-Chefe Bayardo Bapstista Torres, Instituto de Química - USP, Brasil Eduardo Galembeck, Departamento de Bioquímica Instituto de Biologia UNICAMP, Brasil   Editores Gabriel Gerber Hornink, Depto. Bioquímica, Instituto de Ciências Biomédicas, Universidade - Federal de Alfenas - Unifal-MG, Brasil Vera Maria Treis Trindade, Instituto de Ciências Básicas da Saúde, Departamento de Bioquímica, Universidade Federal do Rio Grande do Sul, Brasil   Corpo Editorial Adriana Cassina, Departamento de Bioquímica, Facultad de Medicina, Universidad de la República, Uruguai Angel Herráez, Departamento de Bioquímica y Biología molecular, Universidad de Alcalá de Henares, Madrid, Espanha André Amaral Gonçalves Bianco, Universidade Federal de São Paulo (Unifesp, Brasil Denise Vaz de Macedo, Departamento de Bioquímica, Instituto de Biologia, Universidade Estadual de Campinas - Unicamp, Brasil Eneida de Paula, Departamento de Bioquímica, Instituto de Biologia, Universidade Estadual de Campinas - Unicamp, Brasil Guilherme Andrade Marson, Instituto de Química - USP, Brasil Jose Antonio Martinez Oyanedel, Universidad de Concepción, Chile Josep Maria Fernández Novell, Dept. Bioquímica i Biologia Molecular Universitat de Barcelona, Espanha Leila Maria Beltramini, Instituto de Física de São Carlos, Universidade Estadual de São Paulo - USP, Brasil Manuel João da Costa, Escola de Ciências da Saúde, Universidade do Minho, Portugal Maria Lucia Bianconi, Instituto de Bioquímica Médica Universidade Federal do Rio de Janeiro (UFRJ, Brasil María Noel Alvarez, Departamento de Bioquímica, Facultad de Medicina, Universidad de la República, Uruguai Miguel Ángel Medina Torres, Department of Molecular Biology & Biochemistry Faculty of Sciences University of Málaga, Espanha Nelma Regina Segnini Bossolan, Instituto de Física de São Carlos, Universidade de São Paulo - USP, Brasil Paulo De Avila

  1. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  2. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  3. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive

  4. Containment and Surveillance Equipment Compendium

    International Nuclear Information System (INIS)

    Luetters, F.O.

    1980-02-01

    The Containment and Surveillance Equipment Compendium contains information sections describing the application and status of seals, optical surveillance systems, and monitors for international safeguards systems. The Compendium is a collection of information on equipment in use (generally by the IAEA) or under development in the US in diverse programs being conducted at numerous facilities under different sponsors. The Compendium establishes a baseline for the status and applications of C/S equipment and is a tool to assist in the planning of future C/S hardware development activities. The Appendix contains design concepts which can be developed to meet future goals

  5. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  6. EAS Equipment Authorization Grantee Registrations

    Data.gov (United States)

    Federal Communications Commission — EAS (Equipment Authorization System). Radio Frequency (RF) devices are required to be properly authorized under 47 CFR Part 2 prior to being marketed or imported...

  7. ENERGY STAR Certified Imaging Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 2.0 ENERGY STAR Program Requirements for Imaging Equipment that are effective as of...

  8. EMR Measurements on NDA Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Macdonell, Alexander Thomas [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Meierbachtol, Krista Cruse [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Evans, James Walter Jr. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Mayo, Douglas R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-07-10

    Electromagnetic radiation (EMR) emission strength measurements were performed on a suite of passive non-destructive assay (NDA) radiation detection equipment. Data were collected from 9 kHz up to 6 GHz on each of the assembled systems.

  9. Mongolia - Vocational Education - Equipment Upgrades

    Data.gov (United States)

    Millennium Challenge Corporation — Evaluation design The impact evaluation sought to identify the causal impact of exposure to equipment upgrades on subsequent outcomes. Insofar as we were not able to...

  10. Origins of eponymous orthopaedic equipment.

    Science.gov (United States)

    Meals, Clifton; Wang, Jeffrey

    2010-06-01

    Orthopaedists make great use of eponymous equipment, however the origins of these tools are unknown to many users. This history enriches, enlightens, and enhances surgical education, and may inspire modern innovation. We explored the origins of common and eponymous orthopaedic equipment. We selected pieces of equipment named for their inventors and in the broadest use by modern orthopaedists. We do not describe specialized orthopaedic implants and instruments owing to the overwhelming number of these devices. The history of this equipment reflects the coevolution of orthopaedics and battlefield medicine. Additionally, these stories evidence the primacy of elegant design and suggest that innovation is often a process of revision and refinement rather than sudden inspiration. Their history exposes surgical innovators as brilliant, lucky, hardworking, and sometimes odd. These stories amuse, enlighten, and may inspire modern orthopaedists to develop creative solutions of their own. The rich history of the field's eponymous instruments informs an ongoing tradition of innovation in orthopaedics.

  11. Operation monitor for plant equipment

    International Nuclear Information System (INIS)

    Kondo, Tetsufumi; Kanemoto, Shigeru.

    1991-01-01

    In a nuclear power plant, states of each of equipment in the plant are monitored accurately even under such a operation condition that the power is changed. That is, the fundamental idea is based on a model comparison method. A deviation between an output signal upon normal plant state obtained in a forecasting model device and that of the objective equipment in the plant are compared with a predetermined value. The result of the comparison is inputted to an alarm device to alarm the abnormality of the states of the equipment to an operator. The device of the present invention thus constituted can monitor the abnormality of the operation of equipment accurately even under such a condition that a power level fluctuates. As a result, it can remarkably contribute to mitigate operator's monitoring operation under the condition such as during load following operation. (I.S.)

  12. Equipment improvements for performance enhancement

    International Nuclear Information System (INIS)

    Gaestel, P.; Guesnon, H.; Sauze, G.

    1994-01-01

    In order to enhance the reactor availability, several improvements on reactor equipment have been developed: design optimization for stator maintenance replacement in the main alternator; adjustment modification of stator coils in the main alternator for an easier maintenance; improvement of the fuel handling line (pole crane, transfer equipment, loading machine); development of a loose part trapping system in the steam generator secondary circuit. 1 tab

  13. Low level photoneutron detection equipment

    International Nuclear Information System (INIS)

    Ji Changsong; Zhang Yuqin; Li Yuansui

    1991-01-01

    A low level photoneutron detection equipment has been developed. The photoneutrons produced by interaction of 226 Ra gamma quanta and deutron (D) target are detected with n-n discrimination detector made up of 3 He proportional counter array. The D-content information in the target can be obtained from the measured photoneutron counts. The equipment developed is mainly used for nondestructive D-content measurement of D-devices

  14. FUSRAP equipment concept development study

    International Nuclear Information System (INIS)

    Hinerman, K.B.; Smith, R.E.

    1981-01-01

    Under DOE contract, Dalton-Dalton-Newport, Inc. is performing an engineering evaluation of three selected FUSRAP sites in an effort to generate equipment concepts to perform remedial action for retrieval, packaging, storing, and transporting contaminated soil and other debris. Along with this engineering evaluation, an analysis of state and Federal regulations was made which had significant impact on the selected equipment and costs for each remedial action concept

  15. Remotely operated replaceable process equipment

    International Nuclear Information System (INIS)

    Westendorf, H.

    1987-01-01

    The coupling process of pneumatic and electrical auxiliary lines of a pneumatic control pressure line in a large cell of the reprocessing plant is carried out, together with the coupling process of the connecting flange of the process equipment. The coupling places of the auxiliary lines, such as control or supply lines, are laid in the flange parts of the flanges to be connected. The pipe flange on the frame side remains flush with the connecting flange of the process equipment. (DG) [de

  16. Partners in qualified equipment supply

    International Nuclear Information System (INIS)

    Rygg, D.E.; O'Hare, G.J.

    1993-01-01

    Industry initiatives have been taken to improve procurement practices and commercial dedication programs, formation of procurement engineering groups, emphasis on product quality, and increased engineering involvement in procurement and maintenance of qualified equipment. This poses new challenges for many licensees in terms of resources, product knowledge, and access to information normally held proprietary by equipment suppliers. Alternative approaches to future licensee/Westinghouse relationships which will allow licensees to adapt to the changing environment are discussed. 2 figs

  17. MAINTAINING ACCESS TO AMERICA'S INTERMODAL PORTS/TECHNOLOGIES FOR DECONTAMINATION OF DREDGED SEDIMENT: NEW YORK/NEW JERSEY HARBOR

    Energy Technology Data Exchange (ETDEWEB)

    STERN,E.A.; JONES,K.; DONATO,K.; PAULING,J.D.; SONTAG,J.G.; CLESCERI,N.L.; MENSINGER,M.C.; WILDE,C.L.

    1998-05-01

    One of the greatest drivers for maintaining access to America's Intermodal ports and related infrastructure redevelopment efforts over the next several years will be the control and treatment of contaminated sediments dredged from the nation's waterways. More than 306 million cubic meters (m{sup 3}) (400 million cubic yards [cy]) of sediments are dredged annually from US waterways, and each year close to 46 million m{sup 3} (60 million cy) of this material is disposed of in the ocean (EPA 842-F-96-003). The need to protect the environment against undesirable effects from sediment dredging and disposal practices is gaining increased attention from the public and governmental agencies. Meeting this need is a challenging task not only from the standpoint of solving formidable scientific and engineering problems, but also, and more importantly, from the need to implement complex collaborations among the many different parties concerned with the problem. Some 40 years ago, C.P. Snow pointed out the problems involved in communicating between the two cultures of the sciences and the humanities (Snow, 1993). Today, it is necessary to extend Snow's concept to a multicultural realm with groups that include governmental, industrial, environmental, academic, and the general public communicating in different languages based on widely different fundamental assumptions. The handling of contaminated sediments in the Port of New York/New Jersey (Port) exemplifies this problem. This paper describes a multicultural team that has formed as the result of a Congressional mandate for the development of procedures suitable for the decontamination of sediments in the Port under the Water Resources Development Act (WRDA) of 1992 (Section 405C) and 1996 (Section 226).

  18. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  19. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  20. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  1. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  2. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  3. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  4. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  5. AVM branch vibration test equipment

    International Nuclear Information System (INIS)

    Anne, J.P.

    1995-01-01

    An inventory of the test equipment of the AVM Branch ''Acoustic and Vibratory Mechanics Analysis Methods'' group has been undertaken. The purpose of this inventory is to enable better acquaintance with the technical characteristics of the equipment, providing an accurate definition of their functionalities, ad to inform potential users of the possibilities and equipment available in this field. The report first summarizes the various experimental surveys conduced. Then, using the AVM equipment database to draw up an exhaustive list of available equipment, it provides a full-scope picture of the vibration measurement systems (sensors, conditioners and exciters) and data processing resources commonly used on industrial sites and in laboratories. A definition is also given of a mobile test unit, called 'shelter', and a test bench used for the testing and performance rating of the experimental analysis methods developed by the group. The report concludes with a description of two fixed installations: - the calibration bench ensuring the requisite quality level for the vibration measurement systems ; - the training bench, whereby know-how acquired in the field in the field of measurement and experimental analysis processes is made available to others. (author). 27 refs., 15 figs., 2 appends

  6. 78 FR 25916 - Authorization of Radiofrequency Equipment

    Science.gov (United States)

    2013-05-03

    ...] Authorization of Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Proposed rule... bodies, and measurement procedures used to determine RF equipment compliance. The Commission believes... Commission is responsible for an equipment authorization program for radiofrequency (RF) devices under part 2...

  7. Another donation of computer equipment

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Thursday 27 February, CERN was pleased to donate computer equipment to a physics institute in the Philippines.   H.E. Leslie J. Baja and Rolf Heuer. Following donations of computer equipment to institutes in Morocco, Ghana, Bulgaria, Serbia and Egypt, CERN is to send 50 servers and 4 network switches to the National Institute of Physics at the University of the Philippines Diliman. CERN’s Director-General Rolf Heuer and the Ambassador of the Philippines to Switzerland and Lichtenstein, H.E. Leslie J. Baja, spoke of their enthusiasm for the project during an official ceremony. The equipment will be used for various high energy physics research programmes in the Philippines and for the University’s development of digital resources for science.

  8. Waste Electrical and Electronic Equipment

    DEFF Research Database (Denmark)

    Bigum, Marianne Kristine Kjærgaard; Christensen, Thomas Højlund

    2011-01-01

    Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans and the env......Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans...

  9. The development of superconducting equipment

    CERN Document Server

    Ueda, T; Hiue, H

    2003-01-01

    Fuji Electric has been developing various types of superconducting equipment for over a quarter of a century. This paper describes the development results achieved for superconducting equipment and especially focuses on large-capacity current leads and superconducting transmission systems, the development of which is being promoted for application to the field of nuclear fusion. High temperature superconductor (HTS) is becoming the mainstream in the field of superconductivity, and the HTS floating coil and conduction-cooled HTS transformed are also introduced as recent developments for devices that utilize this technology. (author)

  10. Mechanical (turbines and auxiliary equipment)

    CERN Document Server

    Sherry, A; Cruddace, AE

    2013-01-01

    Modern Power Station Practice, Volume 3: Mechanical (Turbines and Auxiliary Equipment) focuses on the development of turbines and auxiliary equipment used in power stations in Great Britain. Topics covered include thermodynamics and steam turbine theory; turbine auxiliary systems such as lubrication systems, feed water heating systems, and the condenser and cooling water plants. Miscellaneous station services, and pipework in power plants are also described. This book is comprised of five chapters and begins with an overview of thermodynamics and steam turbine theory, paying particular attenti

  11. A preliminary demonstration of "virtual warehousing" and cross-docking technique with active RFID combined with asset tracking equipment.

    Science.gov (United States)

    2010-11-01

    The University of Denvers Intermodal Transportation Institute and System Planning : Corporations GlobalTrak system have successfully demonstrated the integration of GPS : tracking and active RFID monitoring of simulated cargo of pallet and cart...

  12. Damage limits of accelerator equipment

    CERN Document Server

    Rosell, Gemma

    2014-01-01

    Beam losses occur in particle accelerators for various reasons. The effect of lost particles on accelerator equipment becomes more severe with the increasing energies and intensities. The present study is focused on the damage potential of the proton beam as a function of particle energy and beam size. Injection and extraction energies of different accelerators at CERN were considered.

  13. Pocket dictionary of laboratory equipment

    International Nuclear Information System (INIS)

    Junge, H.D.

    1987-01-01

    This pocket dictionary contains the 2500 most common terms for scientific and technical equipment in chemical laboratories. It is a useful tool for those who are used to communicating in German and English, but have to learn the special terminology in this field. (orig.) [de

  14. Using Gaming Equipment to Teach

    Science.gov (United States)

    Curriculum Review, 2009

    2009-01-01

    Gaming equipment (such as Nintendo's Wii[TM]) is making its way to schools and classrooms. However, most of the discussion regarding how to use this technology and integrate it into lesson plans is happening in blogs on the Internet. An advocate of interactive media in the classroom, Dr. Dawn Hawkins, a faculty member for the Art Institute of…

  15. Isotope-equipped measuring instruments

    International Nuclear Information System (INIS)

    Miyagawa, Kazuo; Amano, Hiroshi

    1980-01-01

    In the steel industry, though the investment in isotope-equipped measuring instruments is small as compared with that in machinery, they play important role in the moisture measurement in sintering and blast furnaces, the thickness measurement in rolling process and others in automatic control systems. The economic aspect of the isotope-equipped measuring instruments is described on the basis of the practices in Kimitsu Works of Nippon Steel Corporation: distribution of such instruments, evaluation of economic effects, usefulness evaluation in view of raising the accuracy, and usefulness evaluation viewed from the failure of the isotope instruments. The evaluation of economic effects was made under the premise that the isotope-equipped measuring instruments are not employed. Then, the effects of raising the accuracy are evaluated for a γ-ray plate thickness gauge and a neutron moisture gauge for coke in a blast furnace. Finally, the usefulness was evaluated, assuming possible failure of the isotope-equipped measuring instruments. (J.P.N.)

  16. Hydraulic turbines and auxiliary equipment

    Energy Technology Data Exchange (ETDEWEB)

    Luo Gaorong [Organization of the United Nations, Beijing (China). International Centre of Small Hydroelectric Power Plants

    1995-07-01

    This document presents a general overview on hydraulic turbines and auxiliary equipment, emphasizing the turbine classification, in accordance with the different types of turbines, standard turbine series in China, turbine selection based on the basic data required for the preliminary design, general hill model curves, chart of turbine series and the arrangement of application for hydraulic turbines, hydraulic turbine testing, and speed regulating device.

  17. Alternative Fuels Data Center: Biodiesel Equipment Options

    Science.gov (United States)

    Equipment Options to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment Options on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment Options on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Google Bookmark Alternative Fuels

  18. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  19. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  20. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  1. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  2. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  3. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  4. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  5. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  6. The Cost of Maintaining Educational Communications Equipment.

    Science.gov (United States)

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  7. [Equipment and technology in robotics].

    Science.gov (United States)

    Murphy, Declan; Challacombe, Ben; Nedas, Tim; Elhage, Oussama; Althoefer, Kaspar; Seneviratne, Lakmal; Dasgupta, Prokar

    2007-05-01

    We review the evolution and current status of robotic equipment and technology in urology. We also describe future developments in the key areas of virtual reality simulation, mechatronics and nanorobotics. The history of robotic technology is reviewed and put into the context of current systems. Experts in the associated fields of nanorobotics, mechatronics and virtual reality simulation simulation review the important future developments in these areas.

  8. Remote handling equipment for SNS

    International Nuclear Information System (INIS)

    Poulten, B.H.

    1983-01-01

    This report gives information on the areas of the SNS, facility which become highly radioactive preventing hands-on maintenance. Levels of activity are sufficiently high in the Target Station Area of the SNS, especially under fault conditions, to warrant reactor technology to be used in the design of the water, drainage and ventilation systems. These problems, together with the type of remote handling equipment required in the SNS, are discussed

  9. Margins related to equipment design

    International Nuclear Information System (INIS)

    Devos, J.

    1994-01-01

    Safety margins related to design of reactor equipment are defined according to safety regulations. Advanced best estimate methods are proposed including some examples which were computed and compared to experimental results. Best estimate methods require greater computation effort and more material data but give better variable accuracy and need careful experimental validation. Simplified methods compared to the previous are less sensitive to material data, sometimes are more accurate but very long to elaborate

  10. Temperature radiation measuring equipment. Temperaturstrahlungsmessgeraet

    Energy Technology Data Exchange (ETDEWEB)

    Lotzer, W

    1981-01-22

    The invention is concerned with a temperature radiation measuring equipment for non-contact temperature measurement by the light intensity variation method, with a photoelectric resistance as the measuring element. By having a circuit with a transistor, the 'dark resistance' occurring in the course of time is compensated for and thus gives a genuine reading (ie. the voltage drop across the photoelectric resistance remains constant).

  11. CERN computing equipment for Senegal

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On 26 May, CERN once again had the honour of donating computing equipment to a foreign institute.   This time, around 100 servers and five network hubs were sent to Senegal, making it the seventh country, after Morocco, Ghana, Bulgaria, Serbia, Egypt and the Philippines, to receive a donation of computing equipment from the Organization. The official ceremony was held at CERN on 26 May in the presence of the Director-General, Rolf Heuer, and Senegal's ambassador to Geneva, Fodé Seck, who both expressed their enthusiasm for the project. The equipment is intended for Cheikh Anta Diop University (UCAD) in Dakar and will be of particular use to students attending the African School of Fundamental Physics and its Applications (ASP 2014) taking place from 3 to 23 August, for which CERN is a partner. The ASP allows a large number of African students to hone their skills in high-energy physics and to forge professional links with fellow physicists in Africa and Europe. ...

  12. Um modelo de fluxos e localização de terminais intermodais para escoamento da soja brasileira destinada à exportação A model for flow allocation and location of intermodal terminals for the Brazilian soybean exports

    Directory of Open Access Journals (Sweden)

    Mônica do Amaral

    2012-12-01

    Full Text Available A consideração de rotas intermodais pode ser vantajosa em diversas situações, como nos casos de escoamento de produtos agrícolas para exportação. Entretanto, a possibilidade de redução dos custos logísticos está condicionada à existência de instalações que permitam o transbordo de carga e a integração entre os modais disponíveis. Nesse contexto, propõe-se um modelo de fluxos e localização de terminais intermodais, com o objetivo de apoiar decisões de investimento em infraestrutura e de roteirização na rede. O modelo possui forte relação com problemas de p-medianas, sabidamente NP-difíceis. São considerados múltiplos níveis, em que cada nível corresponde ao fluxo entre dois terminais, e uma estrutura esparsa para representação da rede. Testes realizados com uma rede para exportação de soja baseada em dados secundários foram utilizados para verificar a coerência e ilustrar o potencial de análise do modelo, enquanto instâncias geradas aleatoriamente serviram para avaliar seu desempenho computacional utilizando-se dois softwares de otimização.The use of intermodal routes may be advantageous in several situations such as to export agricultural products. However, the possibility of reducing logistics costs depends on the existence of intermodal facilities for the transshipment and the integration between the available modes. In this context, we propose a model for flow allocation and location of intermodal terminals to support investment decisions in network infrastructure and routing. The model is closely related to the NP-hard p-median problem. Multiple levels were used to represent the flows between two terminals, and a sparse structure was used for the network matrix representation. Tests using a soybean network for exports based on secondary data were performed to verify the model consistency and to illustrate the potential of analysis of the model, while randomly generated instances were used to evaluate

  13. JCE Online: Equipment Buyers Guide

    Science.gov (United States)

    Holmes, Jon L.

    1999-01-01

    The Equipment Buyers Guide was edited by Jo Rita Jordan. The new Equipment Buyers Guide, bound into the back of this issue, is also a new resource of JCE Internet. This resource provides an online source for the information contained in the printed guide. Placing this information online allows us to regularly update it and to provide live links to the suppliers' WWW sites. The organization of the online version parallels that of the print version. There is an alphabetical list of suppliers and a categorical listing. Links to these lists are provided on every page in the left-hand navigation bar. To quickly find information about a particular supplier, you click Supplier List, click the letter that begins the supplier's name, and scroll through the list to find the supplier. To find which suppliers provide a particular type of instrument or equipment, use the Categories link; click the category of the equipment you are looking for and then click the link to a supplier. You will then be taken to an alphabetical supplier listing page where you can scroll until you find the particular supplier of the item for which you are looking. Once you have found a supplier, the online Equipment Buyers Guide gives you the traditional contact information. But in addition, you also get one-click access to the WWW sites of the suppliers that have them. Depending on the site, you should be able to find information about the items that you seek and may even be able to order the items online! We think that you will find the online version of the Equipment Buyers Guide useful. To make it more useful, please send your suggestions, any errors or omissions you find, and any additional categories to the editor at jjordan@world.std.com The online Equipment Buyers Guide can be found at JCE Online at http://JChemEd.chem.wisc.edu/JCEWWW/Resources/EBG/ JCE Online in '99 JCE Online is your online source of "all things JCE". In order to provide you with an even more useful online resource, JCE

  14. Division of Scientific Equipment - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2002-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: * designs of devices and equipment for experiments in physics; their mechanical construction and assembly. In particular, these are vacuum chambers and installations for HV and UHV;* maintenance and upgrading of the existing installations and equipment in our Institute; * participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and an A0 plotter, which allow us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop offers a wide range of machining and treatment methods with satisfactory tolerances and surface quality. They include: * turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc type elements of a diameter up to 600 mm and a length not exceeding 300 mm, * milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm, * grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm, * drilling - holes of a diameter up to 50 mm, * welding - electrical and gas welding, including TIG vacuum-tight welding, * soft and hard soldering, * mechanical works including precision engineering, * plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides, * painting - paint spraying with possibility of using furnace-fired drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop is equipped with the CNC milling machine which can be used for machining of work pieces up to 500 kg. The machine

  15. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  16. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  17. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2001-01-01

    Full text: The activity of ZdAJ in 2000 was focused on realisation of the Government-Ordered Project - 6/15 MeV Accelerator. The realisation was accomplished in two stages: - stage I should result in deriving principal operational parameters of the accelerator - stage 2 will result in full implementation of the control system providing optimum control of the equipment and automatic maintaining of its parameters. Within the frames of the first stage, a klystron modulator panel was finished and the design documentation of the mechanical supporting structure, the arm, accelerating structure, collimator and control panel were advanced. Manufacturing of the above sub-units in the workshop has started. In the frames of the Specific Project of the State Committee for Scientific Research, the improvement of Neptun lOPC accelerator was undertaken. The read-out of the monitor dose with atmospheric pressure and ambient temperature compensation has been introduced. New filters for equalising the photon and electron beam and new wedge filters have been designed. Changes in programming have been introduced, which improve the patient's safety by eliminating possible personnel errors and increase the accuracy of radiation fields read-out. In 2000 ZdAJ progressed in development of the Quality System conforming EN-ISO 9001 Standard by including the provisions of EN 46001 Standard. The Standard EN 46001: ''Quality Systems - Medical Equipment''. Detailed requirements related to application of EN ISO 9001 is an European Quality Standard extending the provisions of EN ISO 9001 Standard over the manufacturers of medical equipment. (author)

  18. Reactor vital equipment determination techniques

    International Nuclear Information System (INIS)

    Bott, T.F.; Thomas, W.S.

    1983-01-01

    The Reactor Vital Equipment Determination Techniques program at the Los Alamos National Laboratory is discussed. The purpose of the program is to provide the Nuclear Regulatory Commission (NRC) with technical support in identifying vital areas at nuclear power plants using a fault-tree technique. A reexamination of some system modeling assumptions is being performed for the Vital Area Analysis Program. A short description of the vital area analysis and supporting research on modeling assumptions is presented. Perceptions of program modifications based on the research are outlined, and the status of high-priority research topics is discussed

  19. The replace repair decision for heavy equipment.

    Science.gov (United States)

    2004-01-01

    The fleet of equipment operated by the Virginia Department of Transportation (VDOT) constitutes a large investment, on the order of half a billion dollars. A means of identifying earlier and more accurately those pieces of equipment whose timely repl...

  20. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  1. Integrated Intermodal Passenger Transportation System

    Science.gov (United States)

    Klock, Ryan; Owens, David; Schwartz, Henry; Plencner, Robert

    2012-01-01

    Modern transportation consists of many unique modes of travel. Each of these modes and their respective industries has evolved independently over time, forming a largely incoherent and inefficient overall transportation system. Travelers today are forced to spend unnecessary time and efforts planning a trip through varying modes of travel each with their own scheduling, pricing, and services; causing many travelers to simply rely on their relatively inefficient and expensive personal automobile. This paper presents a demonstration program system to not only collect and format many different sources of trip planning information, but also combine these independent modes of travel in order to form optimal routes and itineraries of travel. The results of this system show a mean decrease in inter-city travel time of 10 percent and a 25 percent reduction in carbon dioxide emissions over personal automobiles. Additionally, a 55 percent reduction in carbon dioxide emissions is observed for intra-city travel. A conclusion is that current resources are available, if somewhat hidden, to drastically improve point to point transportation in terms of time spent traveling, the cost of travel, and the ecological impact of a trip. Finally, future concepts are considered which could dramatically improve the interoperability and efficiency of the transportation infrastructure.

  2. Intermodal transfer of spent fuel

    International Nuclear Information System (INIS)

    Neuhauser, K.S.; Weiner, R.F.

    1993-01-01

    This paper discusses RADTRAN calculational models and parameter values for describing dose to workers during incident-free ship-to-truck transfer of spent fuel. Data obtained during observation of the offloading of research reactor spent fuel at Newport News Terminal in the Port of Hampton Roads, Virginia, are described. These data include estimates of exposure times and distances for handlers, inspectors, and other workers during offloading and overnight storage. Other workers include crane operators, scale operators, security personnel, and truck drivers. The data are compared to the default data in RADTRAN 4, and the latter are found to be conservative. The casks were loaded under IAEA supervision at their point of origin, and three separate radiological inspections of each cask were performed at the entry to the port (Hampton Roads) by the U.S. Coast Guard, the state of Virginia, and the shipping firm. As a result of the international standardization of containerized cargo handling in ports around the world, maritime shipment handling is particularly uniform. Thus, handler exposure parameters will be relatively constant for ship-truck and ship-rail transfers at ports throughout the world. Inspectors' doses are expected to vary because of jurisdictional considerations. The results of this study should be applicable to truck-to-rail transfers. (author)

  3. Intermodal transfer of spent fuel

    International Nuclear Information System (INIS)

    Neuhauser, K.S.; Weiner, R.F.

    1991-01-01

    As a result of the international standardization of containerized cargo handling in ports around the world, maritime shipment handling is particularly uniform. Thus, handier exposure parameters will be relatively constant for ship-truck and ship-rail transfers at ports throughout the world. Inspectors' doses are expected to vary because of jurisdictional considerations. The results of this study should be applicable to truck-to-rail transfers. A study of the movement of spent fuel casks through ports, including the loading and unloading of containers from cargo vessels, afforded an opportunity to estimate the radiation doses to those individuals handling the spent fuels with doses to the public along subsequent transportation routes of the fuel. A number of states require redundant inspections and for escorts over long distances on highways; thus handlers, inspectors, escort personnel, and others who are not normally classified as radiation workers may sustain doses high enough to warrant concern about occupational safety. This paper addresses the question of radiation safety for these workers. Data were obtained during, observation of the offloading of reactor spent fuel (research reactor spent fuel, in this instance) which included estimates of exposure times and distances for handlers, inspectors and other workers during offloading and overnight storage. Exposure times and distance were also for other workers, including crane operators, scale operators, security personnel and truck drivers. RADTRAN calculational models and parameter values then facilitated estimation of the dose to workers during incident-free ship-to-truck transfer of spent fuel

  4. Musical Sound, Instruments, and Equipment

    Science.gov (United States)

    Photinos, Panos

    2017-12-01

    'Musical Sound, Instruments, and Equipment' offers a basic understanding of sound, musical instruments and music equipment, geared towards a general audience and non-science majors. The book begins with an introduction of the fundamental properties of sound waves, and the perception of the characteristics of sound. The relation between intensity and loudness, and the relation between frequency and pitch are discussed. The basics of propagation of sound waves, and the interaction of sound waves with objects and structures of various sizes are introduced. Standing waves, harmonics and resonance are explained in simple terms, using graphics that provide a visual understanding. The development is focused on musical instruments and acoustics. The construction of musical scales and the frequency relations are reviewed and applied in the description of musical instruments. The frequency spectrum of selected instruments is explored using freely available sound analysis software. Sound amplification and sound recording, including analog and digital approaches, are discussed in two separate chapters. The book concludes with a chapter on acoustics, the physical factors that affect the quality of the music experience, and practical ways to improve the acoustics at home or small recording studios. A brief technical section is provided at the end of each chapter, where the interested reader can find the relevant physics and sample calculations. These quantitative sections can be skipped without affecting the comprehension of the basic material. Questions are provided to test the reader's understanding of the material. Answers are given in the appendix.

  5. Concerning equipment procurement for NPPs

    International Nuclear Information System (INIS)

    Pana, N.

    2002-01-01

    After a stagnation in investments for nuclear power which extended over a period of 10-15 years, assessments done by energy forecast institutes, as well as, evaluations by UE institutions, OECD, and DOE (USA) point to the conclusion solid and argued that the electric energy of nuclear origin will record a new boost beginning probably with the year 2005. Particular efforts were concentrated upon improving the performances of existing plants and, on the other hand, towards new, evolutionary concepts in nuclear engineering. Advanced equipment for nuclear reactors and plants resulted and were already implemented. In Europe construction of both advanced PWR and BWR type reactors are underway. The paper consider the issues of Romanian nuclear power and presents the prospects for advanced CANDU reactors in connection with the Romania's infrastructure and necessities. The problem of modernizing the equipment and components for NPP is discussed in the context of financing and investment conditions. In conclusion, the share of nuclear power in Romania is expected to rise in order to compensate the decline in fossil fuel thermal power and to better solve the environmental issues

  6. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  7. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  8. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  9. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  10. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  11. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  12. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  13. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  14. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  15. 30 CFR 250.602 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.602 Section 250.602... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.602 Equipment movement. The movement of well-workover rigs and related equipment on and off a platform or from well to well on...

  16. 30 CFR 250.502 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.502 Section 250.502... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion Operations § 250.502 Equipment movement. The movement of well-completion rigs and related equipment on and off a platform or from well to well...

  17. 46 CFR 121.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cooking equipment. 121.220 Section 121.220 Shipping... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.220 Cooking equipment. (a) Doors on a cooking appliance... cooking appliance must be installed to prevent movement in heavy seas. (c) For a grill or similar type of...

  18. 46 CFR 184.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping...) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking equipment. (a) Doors on a cooking appliance must be provided with hinges and locking devices to prevent...

  19. Special equipment for etching nitrocellulose film

    International Nuclear Information System (INIS)

    Domanus, J.C.

    1983-08-01

    Nitrocellulose film and converter screens used for neutron radiography are described. Difficulties in visualization of radiographs on those films are mentioned. Because there is no equipment for etching nitrocellulose film available on the market Risoe has designed and produced such equipment at an estimated cost of Dkr. 15,000. Design criteria for this equipment are given and its performance described

  20. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  1. 46 CFR 121.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be so...

  2. 46 CFR 184.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating equipment...

  3. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  4. 14 CFR 121.605 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in § 121...

  5. Fire prevention and protection for trackless equipment

    Energy Technology Data Exchange (ETDEWEB)

    Burger, A.J.

    1988-10-01

    With the increased use of trackless diesel and electrical equipment underground, the fire danger associated with this equipment has increased. The need for adequate fire prevention and protection on all aspects of trackless mechanised mining must be taken into consideration. This paper describes briefly the causes of fires on trackless equipment and the precautions taken to reduce the risk of ignition. 1 tab.

  6. Load Bearing Equipment for Bone and Muscle

    Science.gov (United States)

    Shackelford, Linda; Griffith, Bryan

    2015-01-01

    Resistance exercise on ISS has proven effective in maintaining bone mineral density and muscle mass. Exploration missions require exercise with similar high loads using equipment with less mass and volume and greater safety and reliability than resistance exercise equipment used on ISS (iRED, ARED, FWED). Load Bearing Equipment (LBE) uses each exercising person to create and control the load to the partner.

  7. Establishment for Nuclear Equipment -Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2006-01-01

    Research and development works conducted in the Establishment for Nuclear Equipment (ZdAJ) were focused around 3 subject areas: an accelerator for cancer treatment, therapeutical tables, systems and methods for controlling objects that cross international borders. The new, medium energy accelerator for cancer therapy cases is being designed in the Establishment for several years. In 2005 progress was achieved. A physical part, containing an electron beam has been completed and the parameters of that beam make it useful for therapeutical purposes. Consequently, the work on designing and testing of beam control systems, ensuring its high stability, repetition of irradiation parameters and accuracy of dosage have been started. Results of these tests make it very probable that 2006 will be the final year of scientific works and in 2007 the new apparatus will be ready for sales. Therapeutical tables have become a leading product of ZdAJ IPJ. Their technical parameters, reliability and universality in uses are appreciated by many customers of ZdAJ. In 2005, the table Polkam 16 was registered by the national Office for Registration of Medical Equipment as the first product of ZdAJ that meets all technical and formal requirements of the safety mark CE. This allows sales of the product on the market of the European Union. The research and development part of designing a therapeutical table for uses in the total body irradiation technique was also concluded in 2005. After the September 11 terrorist attacks on WTC a matter of controlling international borders have become a priority for many countries. In 2005 in ZdAJ IPJ, we conducted many preliminary calculations and experiments analyzing systems of irradiation sources, both photon and neutron as well as systems of detection and designing of signals triggered by controlling objects crossing the border. The results so far have enabled us to formulate a research project which has been positively evaluated by experts and found

  8. Communication equipment radiation resistance ensurance

    International Nuclear Information System (INIS)

    Myrova, L.O.; Chelizhenko, A.Z.

    1983-01-01

    A review of works on radiation resistance of electronic equipment (epsilon epsilon) for 15 years is presented. The effect of ionizing radiation appearing as a result of nuclear explosions in nuclear facilities and in outerspace on epsilon epsilon has been considered. Types of radiation effects in epsilon epsilon, radiation effect on semiconductor devices and integrated circUits, types of epsilon epsilon failures, as well as the procass of radiation-resistant epsilon epsilon designing and selection of its main parameters have been described. The methods of epsilon epsilon flowsheet optimization, application of mathematical simulation and peculiarities of ensurance of epsilon epsilon radiation resistance of communication systems are considered. Peculiarities of designing of radiation-resistant quartz generators, secondary power supply sources and amplifiers are discussed

  9. Purex: process and equipment performance

    International Nuclear Information System (INIS)

    Orth, D.A.

    1986-01-01

    The Purex process is the solvent extraction system that uses tributyl phosphate as the extractant for separating uranium and plutonium from irradiated reactor fuels. Since the first flowsheet was proposed at Oak Ridge National Laboratory in 1950, the process has endured for over 30 years with only minor modifications. The spread of the technology was rapid, and worldwide use or research on Purex-type processes was reported by the time of the 1955 Geneva Conference. The overall performance of the process has been so good that there are no serious contenders for replacing it soon. This paper presents: process description; equipment performance (mixer-settlers, pulse columns, rapid contactors); fission product decontamination; solvent effects (solvent degradation products); and partitioning of uranium and plutonium

  10. Automation of a thermogravimetric equipment

    International Nuclear Information System (INIS)

    Mussio, L.; Castiglioni, J.; Diano, W.

    1987-01-01

    A low cost automation of some instruments by means of simple electronic circuits and a microcomputer Apple IIe. type is discussed. The electronic circuits described are: a) a position detector including phototransistors connected as differential amplifier; b) a current source that, using the error signal of the position detector, changes the current through the coil of an electromagnetic balance to restore its zero position; c) a proportional temperature controller, zero volt switching to drive a furnace to a desired temperature; d) an interface temperature regulator-microcomputer to control the temperature regulator by software; e) a multiplexer for an analog input of a commercial interface. Those circuits are applied in a thermogravimetric equipment used also for vapours adsorption. A program in block diagram form is included and is able to record change of mass, time, furnace temperature and to drive the temperature regulator in order to have the heating rates or the temperature plateaux needed for the experiment. (author) [pt

  11. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2000-01-01

    Full text: The main objective of the activity of the Establishment for Nuclear Equipment (ZdAJ) in 1999 was to obtain the ISO 9001 certificate. Work on this problem has been successfully completed. The changes introduced in agreement with requirements of ISO in supervising the construction, manufacturing and servicing eliminate possible deficiencies of our products and will pay in the future. Two new important ventures have been undertaken: design of an accelerator with two photon energies and a reconstruction of simulator directed towards better geometrical parameters. The completion of the improvements in accelerator is foreseen for the year 2002. The changes comprise almost all sub-assemblies of the device. The modernized simulator will be installed in the hospital already in the year 2000 - the ameliorations concern mainly the arm of the apparatus, collimator, driving gears and control system. Of course - apart from this, the routine production activity of the Establishment was continued in 1999. (author)

  12. Protective equipment use among female rugby players.

    Science.gov (United States)

    Comstock, R Dawn; Fields, Sarah K; Knox, Christy L

    2005-07-01

    Our objective was to assess the prevalence of protective equipment use and the motivation for using protective equipment among a sample of US female rugby players. We surveyed a convenience sample of 234 current US female rugby players from 14 teams participating in a US women's rugby tournament, obtaining self-reported demographic, rugby exposure, and protective equipment use information. Mouthguards were the most commonly used piece of protective equipment: 90.8% of players reported having always worn a mouthguard while playing or practicing rugby within their most recent 3 months of play. Fewer than 15% of players reported having always worn other types of protective equipment. Equipment use varied by playing position. Whereas over 80% of players in all other positions always wore a mouthguard, 66.7% of scrum halves reported always wearing one. Both backs and forwards reported wearing shoulder pads, but only forwards reported always wearing padded headgear. Mouthguards, padded headgear, and shoulder pads were worn "to prevent injury," whereas ankle braces, neoprene sleeves, and athletic tape on joints were worn "to protect a current/recent injury." This is the first study of female rugby players to assess the prevalence of protective equipment use by playing position and the motivation for using protective equipment. With the exception of mouthguards, US female rugby players infrequently use protective equipment. Protective equipment use varies by playing position. Some types of protective equipment appear to be used as primary prevention mechanisms, whereas others are used as secondary or tertiary prevention mechanisms.

  13. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  14. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  15. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  16. Quality assurance for radiodiagnostic equipment in Uruguay

    International Nuclear Information System (INIS)

    Cotelo, Elena D.

    2001-01-01

    Since Uruguay did not have an study on X-ray equipment, students of Radiation Protection course (RP) made this field work throughout the country. The objective is to obtain information on the number and kind of X-ray radiodiagnostic equipment. Some of the results are: there are 666 radiodiagnostic equipment. The ratio of population to equipment is 4.515 to 1 in the capital and the mean rate in the rest of the country is 4.383 to one, with a minimum of 1.707 and a maximum of 8.220. The Public Health Ministry (MSP) and the Instituciones de Asistencia Medica Colectiva (a kind of private heath assurance) (IAMC) have less equipment in the capital than in the rest of the country. The 37% of the capital population receives assistance through the IAMC , with a 42.5 % of the equipment. Uruguay except the capital has 18 districts and 17 computed tomography equipment, from which only 3 belong to the MSP. Five districts do not have any. In Montevideo, there are 11.500 females over forty years of age per X-ray mammography equipment, and this relation in the rest of the country is 13.900. There are 21 X-ray Interventional radiology equipment, 16 of them are in the capital. Is from relating the radiodiagnostic equipment, the population and the procedures, that quality assistance indicators emerge. This owns high importance on the way to create a RP National Programme. (author)

  17. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  18. Inspection device for buried equipment

    International Nuclear Information System (INIS)

    Hanawa, Jun.

    1994-01-01

    In an inspection device for a buried equipment, a rail is suspended at the upper portion of a vessel of a pit-vessel type pump buried in a plant building floor, and a truck movable vertical in the vessel along the rail, and an ultrasonic wave probe contained in the truck and urged to the vessel by an electromagnet are disposed. In addition, an elevator moving vertically along a shaft is disposed, and an arm having the ultrasonic probe disposed at the end portion and driven by a piston are disposed to the elevator. The ultrasonic wave probe moves vertically together with the truck along the rail in the vessel while being urged to the vessel by the electromagnet to inspect and measure the state at the inner and outer surfaces of the vessel. Further, the length of the arm is controlled so as to set a predetermined distance between the ultrasonic wave probe and the vessel. Subsequently, the elevator is moved vertically along a shaft passing through a shaft hole of a mount, and the shaft is rotated thereby enabling to inspect and measure the state of the inner and outer surfaces of the vessel. (N.H.)

  19. Equipment used in nuclear medicine

    International Nuclear Information System (INIS)

    Das, B.K.; Noreen Norfaraheen Lee Abdullah

    2012-01-01

    Detection of radiation is the common purpose of all equipment's and instruments used in radioisotope laboratories. The first and most important instrument that was used in nuclear medicine was Geiger tube developed by H.W. Geiger as early in 1908. He in association with Mueller developed the so called Geiger-Muller tube (GM tube) which could be used to detect beta and gamma radiations. In spite of its severe limitations, GM tube remained the only external counting device until 1949. In 1948, Kallman reported that the scintillations can be detected and amplified with the help of photomultiplier tubes (PMTs). In comparison with gas filled detectors, scintillation detectors have two principal advantages that augment their use in nuclear medicine. Firstly, they are capable of much higher counting rates because of fast resolving times and secondly, because they are much more efficient for gamma ray detection. The scintillation detector is the most basic block of any modern radioisotope detection instrument like rate meter, counter, scanner, gamma camera or single photon emission computed tomography. (author)

  20. Ageing management and equipment qualification

    International Nuclear Information System (INIS)

    Stahl, Gunnar

    2014-01-01

    The knowledge of how the environment and load of organic material in general and especially polymers and lubricants, is affecting the degradation of important properties, have increased during the last decade. However the restrictions using established additives like some color pigments due to their poisonousness e.g. pigments based at cadmium, lead, mercury etc. have caused problems when replacing additives to polymers. The replacement additives have often been used in new design without going through the required material qualification procedure. There have also been observed that some non-qualified and non-approved materials have been installed in some power plants due to false documentation. There are also a lot of new manufacturers, of materials similar to the previously qualified materials, active at the market. This increases the difficulty to ensure that the required material quality is used. New materials, new additives and new manufacturers makes if more and more difficult to assure that the expected material is present. This causes more strict demands of how the new materials often used in equipment at type-testing and in replacement materials are analyzed and documented. By implementing new steps for chemical, mechanical and electrical analysis and increase the general quality assurance content this issue can be managed. (authors)

  1. Equipment selection for atmospheric drying

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, P D; Bhattacharyya, S [Nuclear Power Corporation, Bhabha Atomic Research Centre, Mumbai (India)

    1994-06-01

    Heavy water management is a major factor in deciding the economics of the PHWRs. Hence it is necessary to have an efficient recovery system, for the heavy water vapour escaping from various process systems and maintain a dry atmosphere in the recovery areas. While the basic objective of the atmospheric drying system is to maximize recovery and to minimize stack losses, it is equally important to optimally design the system with due consideration to operational and maintenance aspects. At present, heavy water vapour recovery in the existing Nuclear Power Plants (NPPs) is carried out by dryers of dual fixed bed design. While moving bed design could have some advantages, this has not been adopted so far because of the cumbersome mechanical design involved and special requirements for nuclear application. Developmental work done in this direction has resulted in compact alternative designs. In one of the designs, the change over from adsorption to regeneration is achieved by rotating the bed slowly. This concept is further refined in another alternative using a dessicant wheel. This paper contains brief equipment description of different designs; enumerates the design requirements of an atmospheric drying system for reactor building; describes steps for designing fixed bed type D{sub 2}O vapour recovery system, and highlights advances in dryer technology. (author). 2 refs., 4 figs., 1 ill.

  2. Materials division facilities and equipment

    International Nuclear Information System (INIS)

    Biest, O. v.d.

    1984-01-01

    The research activities of the Division at the Petten Establishment have the aims of characterising the properties of high temperature materials in industrial process environments and of understanding the structures involved in order to gain an insight into behavioural mechanisms. Metallic materials fall within the scope of the programme; the activities are, at present, almost entirely concerned with austenitic steels and nickel based alloys. Starting in 1984, advanced ceramic materials will be studied as well. The equipment available permits the study of mechanical properties in controlled gaseous environments, of the rates and mechanisms of corrosive reactions between materials and those environments, and of the surface and bulk structures by advanced physical techniques. Special preparation and treatment techniques are available. The Division has developed a Data Bank on high temperature alloys. It also operates an information Centre, the activities of which include the organisation of scientific meetings, the commissioning of ''state of the art'' studies on topics in the field of high temperature materials and their applications and the development of a inventory of current research activities in the field in Europe. This booklet is intended to present the facilities and services of the Division to the organizations which are interested in its programmes of work

  3. ISS qualified thermal carrier equipment

    Science.gov (United States)

    Deuser, Mark S.; Vellinger, John C.; Jennings, Wm. M.

    2000-01-01

    Biotechnology is undergoing a period of rapid and sustained growth, a trend which is expected to continue as the general population ages and as new medical treatments and products are conceived. As pharmaceutical and biomedical companies continue to search for improved methods of production and, for answers to basic research questions, they will seek out new avenues of research. Space processing on the International Space Station (ISS) offers such an opportunity! Space is rapidly becoming an industrial laboratory for biotechnology research and processing. Space bioprocessing offers exciting possibilities for developing new pharmaceuticals and medical treatments, which can be used to benefit mankind on Earth. It also represents a new economic frontier for the private sector. For over eight years, the thermal carrier development team at SHOT has been working with government and commercial sector scientists who are conducting microgravity experiments that require thermal control. SHOT realized several years ago that the hardware currently being used for microgravity thermal control was becoming obsolete. It is likely that the government, academic, and industrial bioscience community members could utilize SHOT's hardware as a replacement to their current microgravity thermal carrier equipment. Moreover, SHOT is aware of several international scientists interested in utilizing our space qualified thermal carrier. SHOT's economic financing concept could be extremely beneficial to the international participant, while providing a source of geographic return for their particular region. Beginning in 2000, flight qualified thermal carriers are expected to be available to both the private and government sectors. .

  4. Diagnostics of Electric Equipment Windings

    Directory of Open Access Journals (Sweden)

    I. I. Branovitsky

    2007-01-01

    Full Text Available The paper presents methodology and results of the investigations pertaining to study of influence of short-circuited turns on transient electrical processes in electric motor windings. Dependence of their damped speed and value of the difference signal, obtained at reciprocal subtraction of damped oscillation curves in absence and in presence of short-circuited turns, on number of turns in the tested windings. It has been determined that damped oscillation curves, immediately attributed to short-circuited turns, have peak values along temporary axis which are areas of the largest transient process sensitivity to КЗ turns.Methodology for diagnostics of single- and three-phase electric motor windings and also other electric equipment, being realized in DO-1 device, has been developed in the paper. The men­tioned device makes it possible to carry out visual comparison and quantitative analysis of damped oscillation curves in the tested windings with standard ones which are set in the device memory and their difference signals.

  5. WP EMPLACEMENT CONTROL AND COMMUNICATION EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    Raczka, N.T.

    1997-01-01

    The objective and scope of this document are to list and briefly describe the major control and communication equipment necessary for waste package emplacement at the proposed nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the required equipment are explained and summarized in the individual subsections of this document. This task was evaluated in accordance with QAP-2-0 and found not to be quality affecting. Therefore, this document was prepared in accordance with NAP-MG-012. The following control and communication equipment are addressed in this document: (1) Programmable Logic Controllers (PLC's); (2) Leaky Feeder Radio Frequency Communication Equipment; (3) Slotted Microwave guide Communication Equipment; (4) Vision Systems; (5) Radio Control Equipment; and (6) Enclosure Cooling Systems

  6. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  7. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  8. Equipment Replacement Decision Making: Opportunities and Challenges

    OpenAIRE

    Fan, Wei (David); Gemar, Mason D.; Machemehl, Randy

    2012-01-01

    The primary function of equipment managers is to replace the right equipment at the right time and at the lowest overall cost. In this paper, the opportunities and challenges associated with equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second, a dynamic programming (DP) based optimization solution methodology is presented to solve the ERO problem. T...

  9. History and development of the tennis equipment

    OpenAIRE

    Horáková, Kateřina

    2007-01-01

    Title: History and development of the tennis equipment. Aim of the work: Process an integral, tabular and synoptic historical development overview of the tennis equipment. This owerview will cover the period since the early beginnings of the game to present days. Methods: Advance work has historical charakter therefore used methods are historiogaphical methods such as chronological method and historical method. Results: Produce tabular description of the tennis equipment by means of reading a...

  10. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  11. Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL)

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose:The Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL) provides a variety of research, design engineering and prototype fabrication services...

  12. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  13. Utility equipment systems: promising more for less

    Energy Technology Data Exchange (ETDEWEB)

    1987-10-01

    This paper discusses current developments in utility equipment systems, a term applied to carrier vehicles, mostly evolved from well-known forms of construction or mining equipment modified to work with a variety of different front or back end attachments. One of the equipment ranges discussed is the Normet cassette system produced by the Orion corporation of Finland, which allows a basic chassis to be converted from a personnel carrier to an ANFO carrier within minutes. LHD vehicles which are being adapted to fulfil multipurpose roles, such as carrying roof supports, chocks and other heavy mining equipment underground are also discussed. 5 figs.

  14. Detection of Equipment Faults Before Beam Loss

    CERN Document Server

    Galambos, J.

    2016-01-01

    High-power hadron accelerators have strict limits on fractional beam loss. In principle, once a high-quality beam is set up in an acceptable state, beam loss should remain steady. However, in practice, there are many trips in operational machines, owing to excessive beam loss. This paper deals with monitoring equipment health to identify precursor signals that indicate an issue with equipment that will lead to unacceptable beam loss. To this end, a variety of equipment and beam signal measurements are described. In particular, several operational examples from the Spallation Neutron Source (SNS) of deteriorating equipment functionality leading to beam loss are reported.

  15. 21 CFR 866.4500 - Immunoelectrophoresis equipment.

    Science.gov (United States)

    2010-04-01

    ... (CONTINUED) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents... clinical use with its electrical power supply is a device used for separating protein molecules...

  16. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  17. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  18. Additional Equipment for Soil Biodegradation

    Science.gov (United States)

    Vondráčková, Terezie; Kraus, Michal; Šál, Jiří

    2017-12-01

    Intensification of industrial production, increasing citizens’ living standards, expanding the consumer assortment mean in the production - consumption cycle a constantly increasing occurrence of waste material, which by its very nature must be considered as a source of useful raw materials in all branches of human activity. In addition to strict legislative requirements, a number of circumstances characterize waste management. It is mainly extensive transport associated with the handling and storage of large volumes of substances with a large assortment of materials (substances of all possible physical and chemical properties) and high demands on reliability and time coordination of follow-up processes. Considerable differences in transport distances, a large number of sources, processors and customers, and not least seasonal fluctuations in waste and strong price pressures cannot be overlooked. This highlights the importance of logistics in waste management. Soils that are contaminated with oil and petroleum products are hazardous industrial waste. Methods of industrial waste disposal are landfilling, biological processes, thermal processes and physical and chemical methods. The paper focuses on the possibilities of degradation of oil pollution, in particular biodegradation by bacteria, which is relatively low-cost among technologies. It is necessary to win the fight with time so that no ground water is contaminated. We have developed two additional devices to help reduce oil accident of smaller ranges. In the case of such an oil accident, it is necessary to carry out the permeability test of contaminated soil in time and, on this basis, to choose the technology appropriate to the accident - either in-sit biodegradation - at the site of the accident, or on-sit - to remove the soil and biodegrade it on the designated deposits. A special injection drill was developed for in-sit biodegradation, tossing and aeration equipment of the extracted soil was developed for

  19. Lunar construction/mining equipment

    Science.gov (United States)

    Ozdemir, Levent

    1990-01-01

    For centuries, mining has utilized drill and blast as the primary method of rock excavation. Although this technique has undergone significant improvements, it still remains a cyclic, labor intensive operation with inherent safety hazards. Other drawbacks include damage to the surrounding ground, creation of blast vibrations, rough excavation walls resulting in increased ventilation requirements, and the lack of selective mining ability. Perhaps the most important shortcoming of drill and blast is that it is not conducive to full implementation of automation or robotics technologies. Numerous attempts have been made in the past to automate drill and blast operations to remove personnel from the hazardous work environment. Although most of the concepts devised look promising on paper, none of them was found workable on a sustained production basis. In particular, the problem of serious damage to equipment during the blasting cycle could not be resolved regardless of the amount of charge used in excavation. Since drill and blast is not capable of meeting the requirements of a fully automated rock fragmentation method, its role is bound to gradually decrease. Mechanical excavation, in contrast, is highly suitable to automation because it is a continuous process and does not involve any explosives. Many of the basic principles and trends controlling the design of an earth-based mechanical excavator will hold in an extraterrestrial environment such as on the lunar surface. However, the economic and physical limitations for transporting materials to space will require major rethinking of these machines. In concept, then, a lunar mechanical excavator will look and perform significantly different from one designed for use here on earth. This viewgraph presentation gives an overview of such mechanical excavator systems.

  20. Special Equipment and/or Devices.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    This standard covers the sanitation requirements for equipment and/or devices used in the storage, preparation, or handling of foods and beverages. The National Sanitation Foundation's basic criteria for the evaluation of special equipment and/or devices has been prepared to fulfill several specific needs, its major function being to serve as a…

  1. 21 CFR 1250.67 - Watering equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as...

  2. Using ADA Tasks to Simulate Operating Equipment

    Science.gov (United States)

    DeAcetis, Louis A.; Schmidt, Oron; Krishen, Kumar

    1990-01-01

    A method of simulating equipment using ADA tasks is discussed. Individual units of equipment are coded as concurrently running tasks that monitor and respond to input signals. This technique has been used in a simulation of the space-to-ground Communications and Tracking subsystem of Space Station Freedom.

  3. Enhancement of equipment services for Kozloduy NPP

    International Nuclear Information System (INIS)

    Schultz, Christophe

    2013-01-01

    Conclusion After 5 years of maintenance services, KNPP and AREVA have continuously intensified their partnership Close cooperation between KNPP, AREVA Local Office Engineers and OEM experts Involvement of sophisticated tools for diagnostics and condition monitoring Performance of engineering services and obsolescence evaluation Possibilities to perform equipment modernization of Electrical and IC equipment in future

  4. Emergency team personnel and technical equipment

    International Nuclear Information System (INIS)

    Muralt, R.

    1989-01-01

    The most important requirements for the emergency team can be summarized in three points. 1) The emergency team must be made up of top personnel from all fields and it should be functionally equiped. 2) The emergency teams must have complete command of their equipment. 3) The members of the team must be well motivated. 1 fig

  5. Weight/balance portable test equipment

    International Nuclear Information System (INIS)

    Whitlock, R.W.

    1994-01-01

    This document shows the general layout, and gives a part description for the weight/balance test equipment. This equipment will aid in the regulation of the leachate loading of tanker trucks. The report contains four drawings with part specifications. The leachate originates from lined trenches

  6. 7 CFR 550.38 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements... Agency, the Cooperator shall use the equipment to be replaced as trade-in or sell the equipment and use...

  7. Quantitative techniques for medical equipment maintenance management

    NARCIS (Netherlands)

    Ben Houria, Zeineb; Masmoudi, Malek; Al Hanbali, Ahmad; Khatrouch, Ikram; Masmoudi, Faouzi

    2016-01-01

    The maintenance department in a hospital is responsible for ensuring the safety of medical equipment and their availability while keeping the operation costs minimal. The selection of the best maintenance strategy is a key decision to reduce the equipment downtime, increase the availability, and

  8. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT... following frequency, include but are not limited to: Equipment Performance check Frequency Frequency of...

  9. Plutonium Immobilization Can Loading Equipment Review

    International Nuclear Information System (INIS)

    Kriikku, E.; Ward, C.; Stokes, M.; Randall, B.; Steed, J.; Jones, R.; Hamilton, L.

    1998-05-01

    This report lists the operations required to complete the Can Loading steps on the Pu Immobilization Plant Flow Sheets and evaluates the equipment options to complete each operation. This report recommends the most appropriate equipment to support Plutonium Immobilization Can Loading operations

  10. Radio monitoring problems, methods, and equipment

    CERN Document Server

    Rembovsky, Anatoly; Kozmin, Vladimir; Smolskiy, Sergey

    2009-01-01

    Offers a unified approach to fundamental aspects of Automated Radio Monitoring (ARM). This book discusses the development, modeling, design, and manufacture of ARM systems. It provides classification and descriptions of modern high-efficient hardware-software ARM equipment, including the equipment for detection and radio direction-finding.

  11. Development of Equipment for Use in Sport

    Science.gov (United States)

    James, David

    2012-01-01

    No one has ever been able to create a running shoe that can make one run faster, but in other sports the design of equipment has the potential to offer considerable enhancement. Judgement has to be made as to whether such advantage becomes unfair. This article indicates many possible sports in which the equipment plays an important part in the…

  12. 36 CFR 1207.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 1207.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... as follows: (1) Items of equipment with a current per-unit fair market value of less than $5,000 may...) Items of equipment with a current per unit fair market value in excess of $5,000 may be retained or sold...

  13. 21 CFR 211.65 - Equipment construction.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS... construction. (a) Equipment shall be constructed so that surfaces that contact components, in-process materials...

  14. 47 CFR 18.203 - Equipment authorization.

    Science.gov (United States)

    2010-10-01

    ... information already on file with the Commission. (2) A technical report pursuant to §§ 18.207 and 18.311. (b... 47 Telecommunication 1 2010-10-01 2010-10-01 false Equipment authorization. 18.203 Section 18.203 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT...

  15. Automatic monitoring of vibration welding equipment

    Science.gov (United States)

    Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

    2014-10-14

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

  16. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  17. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  18. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  19. Oil and gas products and energy equipment

    International Nuclear Information System (INIS)

    1996-01-01

    The planned activities of the Canadian oil and gas products and energy equipment industry for 1996-1997, were presented. The sector is made up of approximately 1500 small and medium sized enterprises. The Canadian oil field manufacturing and servicing industry holds only a small 2.5% share of the world export market, but it is recognized internationally as one of the leading suppliers of advanced petroleum equipment. Their exports include specialized equipment for extracting oil sands, gathering and treatment facilities for sour gas, underbalanced drilling technologies, equipment for wells experiencing declining production rates, top motor drives, winter drilling rigs, and horizontal drilling technologies. They also offer petroleum industry software products. Most exploration and production equipment sold abroad by Canadian firms is manufactured in Canada, but there is an increasing trend toward manufacturing in the country of operation. 2 tabs

  20. Equipment for the handling of thorium materials

    International Nuclear Information System (INIS)

    Heisler, S.W. Jr.; Mihalovich, G.S.

    1988-01-01

    The Feed Materials Production Center (FMPC) is the United States Department of Energy's storage facility for thorium. FMPC thorium handling and overpacking projects ensure the continued safe handling and storage of the thorium inventory until final disposition of the materials is determined and implemented. The handling and overpacking of the thorium materials requires the design of a system that utilizes remote handling and overpacking equipment not currently utilized at the FMPC in the handling of uranium materials. The use of remote equipment significantly reduces radiation exposure to personnel during the handling and overpacking efforts. The design system combines existing technologies from the nuclear industry, the materials processing and handling industry and the mining industry. The designed system consists of a modified fork lift truck for the transport of thorium containers, automated equipment for material identification and inventory control, and remote handling and overpacking equipment for material identification and inventory control, and remote handling and overpacking equipment for repackaging of the thorium materials

  1. Energy to the Edge (E2E) Equipment Assessment U.S. Army Rapid Equipping Force

    Science.gov (United States)

    2015-05-01

    84 Contents Energy to the Edge • U.S. Army Rapid Equipping Force U.S. Army Rapid Equipping Force 1.0 Executive Summary Executive Summary U.S. Army... audiovisual equipment. • Once radiant barrier liner is inserted, the process of subsequent setups • Cables for lighting and outlets are located...behind the internal barrier • The shelter comes with organic audiovisual equipment. b. • • This shelter has a different setup and tear down process

  2. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  3. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  4. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  5. Mega hub for intermodal transport - the planning of the most advanced container terminal in the world; Mega-Drehscheibe fuer den Kombinierten Verkehr - Planung des modernsten Containerbahnhofes der Welt

    Energy Technology Data Exchange (ETDEWEB)

    Franke, K.P. [Noell Stahl- und Maschinenbau GmbH, Wuerzburg (Germany). Abt. Hafentechnik

    1998-12-31

    The introduction of innovative mega hub systems for the operation of cargo trains is a promising starting point for increasing the efficiency of intermodal transport. A first mega hub as it is known has been planned for Northern Germany with its centre in Lehrte near Hannover. Instead of shunting the waggons, containers will be transferred from train to train at the mega hub. This is not only faster, but also more economical and thus more attractive to rail transport clients. No other known system can achieve such high transhipment/shunting capacities per surface unit. The design of the system guarantees the maximum degree of flexibility in transhipment operations. A high degree of automation will ensure the quality and speed of transhipment. The technical development of the fast transhipment system (FTS) by Noell has been completed. (orig.) [Deutsch] Ein vielversprechender Ansatz fuer die Steigerung der Leistungsfaehigkeit des Kombinierten Verkehrs (KV) ist die Einfuehrung von innovativen Drehscheibensystemen fuer den Betrieb der Cargo-Zuege. Eine erste sogenannte Mega-Drehscheibe wurde fuer den Norden Deutschlands mit Zentrum Lehrte bei Hannover geplant. Statt zu rangieren sollen in der Mega-Drehscheibe die Behaelter zwischen den Zuegen umsteigen. Das ist schneller, kostenguenstiger und damit attraktiver fuer den Bahnkunden. Darueber hinaus ist kein System bekannt, bei dem eine so hohe Umschlag-/Umstelleistung je Flaecheneinheit realisiert werden kann. Die Gestaltung der Anlage gewaehrt eine maximale Flexibilitaet im Umschlagbetrieb. Ein hoher Automatisierungsgrad wird Qualitaet und Schnelligkeit des Umschlages sichern. Die technische Entwicklung der Schnellumschlagtechnik seitens Noell ist abgeschlossen. (orig.)

  6. Enhancement pattern of small hepatocellular carcinoma (HCC) at contrast-enhanced US (CEUS), MDCT, and MRI: Intermodality agreement and comparison of diagnostic sensitivity between 2005 and 2010 American Association for the Study of Liver Diseases (AASLD) guidelines

    International Nuclear Information System (INIS)

    Furlan, Alessandro; Marin, Daniele; Cabassa, Paolo; Taibbi, Adele; Brunelli, Elena; Agnello, Francesco; Lagalla, Roberto; Brancatelli, Giuseppe

    2012-01-01

    Objective: To evaluate agreement between contrast-enhanced ultrasound (CEUS), multi-detector row computed tomography (MDCT) and magnetic resonance imaging (MRI) for the assessment of typical and atypical enhancement patterns of small hepatocellular carcinoma (HCC); and to compare diagnostic sensitivity of 2005 and 2010 American Association for the Study of Liver Diseases (AASLD) guidelines. Materials and methods: Between January 2008 and December 2009, we included cirrhotic patients with newly diagnosed 10–20 mm HCC imaged at two contrast-enhanced imaging techniques among CEUS, MDCT, and MRI. Dynamic studies were reviewed by two radiologists to assess enhancement pattern. Percentage of cases with concordant findings and Cohen coefficient (k) were calculated. McNemar's test was used to compare sensitivity between 2005 and 2010 AASLD guidelines. Results: There were 91 patients (69 M; 22 F; mean age, 68 years) with 96 HCCs, studied with a combination of CEUS and MDCT (n = 59), CEUS and MRI (n = 26), or MDCT and MRI (n = 11). Intermodality agreement for assessment of tumor enhancement pattern was 67% (k = 0.294, P = 0.001). Typical enhancement pattern was detected coincidentally at two imaging modalities in 50 (52%) HCCs. Sensitivity for the diagnosis of HCC increased significantly using the 2010 AASLD (81/96 (84%) vs. 50/96 (52%), P < 0.001). Conclusions: Agreement between two imaging modalities for the detection of typical tumor enhancement pattern was reached in 52% of cases. The 2010 AASLD guidelines significantly increased the sensitivity for the diagnosis of HCC

  7. Drawing Evaluation Report for Sampling Equipment Drawings

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined

  8. Drawing evaluation report for sampling equipment drawings

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  9. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  10. Long Length Contaminated Equipment Maintenance Plan

    International Nuclear Information System (INIS)

    ESVELT, C.A.

    2000-01-01

    The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation

  11. Remote handling equipment for CANDU retubing

    International Nuclear Information System (INIS)

    Crawford, G.S.; Lowe, H.

    1993-01-01

    Numet Engineering Ltd. has designed and supplied remote handling equipment for Ontario Hydro's retubing operation of its CANDU reactors at the Bruce Nuclear Generating Station. This equipment consists of ''Retubing Tool Carriers'' an'' Worktables'' which operate remotely or manually at the reactor face. Together they function to transport tooling to and from the reactor face, to position and support tooling during retubing operations, and to deliver and retrieve fuel channels and channel components. This paper presents the fundamentals of the process and discusses the equipment supplied in terms of its design, manufacturing, components and controls, to meet the functional and quality requirements of Ontario Hydro's retubing process. (author)

  12. Equipment for x- and gamma ray radiography

    International Nuclear Information System (INIS)

    Abd Nasir Ibrahim; Azali Muhammad; Ab Razak Hamzah; Abd Aziz Mohamed; Mohammad Pauzi Ismail

    2004-01-01

    The following topics related to the equipment for x - and gamma ray radiography are discussed in this chapter. The topics are x-ray source for Industrial Radiography: properties of x-ray, generation of x-ray, mechanism of x-ray production, x-ray equipment, power supply, distribution of x-ray intensity along the tube: gamma ray source for Industrial Radiography: properties of gamma rays, gamma ray sources, gamma ray projectors on cameras, source changing. Care of Radiographic Equipments: Merits and Demerits of x and Gamma Rays

  13. Exposure parameters in fluoroscopy equipment. Quality control

    International Nuclear Information System (INIS)

    Alonso, M.; Castaneda, M.J.; Matorras, P.; Diaz-Caneja, N.; Gutierrez, I.

    1992-01-01

    Within the quality control program in Diagnostic Radiology currently being undertaken at the 'Marques de Valdecilla' University Hospital, the corresponding specification and procedure prototypes for the control of conventional radioscopy equipment have been elaborated and applied. This paper presents the values proposed in the specifications and those obtained for the following radioscopy equipment parameters: reference kerma, and its reproducibility, kerma linearity, maximum kerma at the skin, and total filtration. The results obtained indicate that the equipment studied could comply with specified requirements if a Maintenance Program were to be implemented in coordination with the Quality Control Program. (author)

  14. LMZ experience in refurbishment of hydroturbine equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sotnikov, Anatoly A. [LMZ, St. Petersburg (Russian Federation). Div. of Hydraulic Machine

    2000-07-01

    AO LMZ experience in refurbishment of hydroturbine equipment is generalized. Hydraulic turbines of many power stations having been in service of more than 30 years need rehabilitation and modernization. As a rule, the following problems are solved in the process of refurbishment works: increase of turbine efficiency and output, ensuring of reliable operation of the equipment during the next length of life, ensuring the environmental safety of the equipment, furnishing of the power station with up to date automatic control systems. The process of refurbishment used by LMZ is described. The examples of refurbishment are given. (author)

  15. Incidents of chemical reactions in cell equipment

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, N.M.; Barlow, C.R. [Uranium Enrichment Organization, Oak Ridge, TN (United States)

    1991-12-31

    Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

  16. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  17. Automatic dose-rate controlling equipment

    International Nuclear Information System (INIS)

    Szasz, T.; Nagy Czirok, Cs.; Batki, L.; Antal, S.

    1977-01-01

    The patent of a dose-rate controlling equipment that can be attached to X-ray image-amplifiers is presented. In the new equipment the current of the photocatode of the image-amplifier is led into the regulating unit, which controls the X-ray generator automatically. The advantages of the equipment are the following: it can be simply attached to any type of X-ray image-amplifier, it accomplishes fast and sensitive regulation, it makes possible the control of both the mA and the kV values, it is attached to the most reliable point of the image-transmission chain. (L.E.)

  18. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  19. 18 CFR 367.57 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... piers and foundations that are designed to be as permanent as the buildings that house the equipment, or... walls, ceilings or floors or without in some way impairing the building, must be included in the...

  20. Capitalization of Defense Technology Security Administration Equipment

    National Research Council Canada - National Science Library

    Gimble, Thomas

    1996-01-01

    ... $5.2 million in the Equipment in Use account on its trial balance. Starting with FY 1996, Defense Technology Security Administration financial data will be included in consolidated DoD financial statements...

  1. Hot conditioning equipment conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  2. Hot conditioning equipment conceptual design report

    International Nuclear Information System (INIS)

    Bradshaw, F.W.

    1996-01-01

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage

  3. ENERGY STAR Certified Electric Vehicle Supply Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Electric Vehicle Supply Equipment that are...

  4. Study Of Robotic Replacement Of Equipment Modules

    Science.gov (United States)

    Backes, Paul G.; Tso, Kam S.

    1992-01-01

    Report discusses issues pertaining to control of single-arm robotic manipulator to remove and install interchangeable equipment modules. Presents preliminary control strategy intended to guide development of control algorithms, along with analyses of problems arising in implementing strategy.

  5. Market survey of level measurement equipment

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    In a market survey of level measurement equipment from 42 manufacturers, which is based on different principles of measurement and which is used for different applications, the data of the various manufacturers is compiled. (orig./HP) [de

  6. 77 FR 13173 - Best Equipped Best Served

    Science.gov (United States)

    2012-03-05

    ... on the best equipped, best performing, best served concept for implementation in the 2012-2014... Advisory Committee (NAC). FAA is seeking stakeholder input on the technical and operational feasibility of...

  7. Methods and equipments used in power reactors

    International Nuclear Information System (INIS)

    Beraha, R.; Delevallee, A.

    1976-01-01

    The various reactor γ fuel scanning facilities presently operating around the world are reviewed. Both equipments proposed by FRAMATOME are described: one is intended for scanning removable fuel pencils, and the other one for fuel assembly scanning [fr

  8. AX Tank Farm ancillary equipment study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This report examines the feasibility of remediating ancillary equipment associated with the 241-AX Tank Farm at the Hanford Site. Ancillary equipment includes surface structures and equipment, process waste piping, ventilation components, wells, and pits, boxes, sumps, and tanks used to make waste transfers to/from the AX tanks and adjoining tank farms. Two remedial alternatives are considered: (1) excavation and removal of all ancillary equipment items, and (2) in-situ stabilization by grout filling, the 241-AX Tank Farm is being employed as a strawman in engineering studies evaluating clean and landfill closure options for Hanford single-shell tanks. This is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  9. VIRTUAL ELECTRONIC COMPONENTS OF THE ELECTRONIC EQUIPMENT

    Directory of Open Access Journals (Sweden)

    E. Lazarevich

    2013-01-01

    Full Text Available The article is present new idea of the creation, developments and improvements of the electronic equipment of complex systems by means of the virtual electronic components. The idea of the virtual electronic components is a presentation and perception of the creation and developments of the equipment on two forming: real – in the manner of standard marketed block of the intellectual property and image – in the manner of virtual component. The real component in most cases slows the development of the electronic equipment. The imaginary component is the «locomotive» of development of the electronic equipment. The Imaginary component contains the scientific has brushed against developer. The scientific has brushed against developer reveals of itself in the manner of virtual component on the modern level of the design rates of microelectronics.

  10. 7 CFR 58.626 - Packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... containers with frozen desserts shall be constructed so that all product contact surfaces shall be of... Standards for Equipment for Packaging Frozen Desserts and Cottage Cheese. Quality Specifications for Raw...

  11. ENERGY STAR Certified Small Network Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Small Networking Equipment that are effective as...

  12. Ethical home medical equipment business practices.

    Science.gov (United States)

    Parver, C

    1991-11-01

    National uniform standards as a condition for receipt of a Medicare provider number would help rid the home medical equipment industry of those unethical and unscrupulous suppliers who have tarnished the industry's reputation.

  13. Experience with rotating equipment in FBTR

    International Nuclear Information System (INIS)

    Babu, A.; Subramanian, K.G.; Selvam, B.

    2006-01-01

    Fast breeder test reactor (FBTR) is a 40MWth sodium cooled PuC-UC fuelled fast breeder reactor located at Kalpakkam, Tamilnadu. FBTR has a variety of mechanical and electrical equipment comprising of single stage and multi stage water pumps, sodium pumps, compressors, Chiller units, Diesel Generator sets, vacuum pumps, ventilation fans, Turbo generator etc. The degree and extent of maintenance on these equipment are decided based on nuclear safety, station technical specification requirements, design criteria and operating philosophy. The variety and complexity of the equipment in FBTR demands various maintenance strategies (preventive, predictive, proactive etc.) for their upkeep. This paper discusses the performance of all mechanical and electrical equipment in FBTR, measures taken for their upkeep, major modifications done to prevent recurring failures, condition monitoring programme implemented, Maintenance Management and Information System developed for data acquisition and dissemination, etc. (author)

  14. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  15. Equipment for oral surgery in small animals.

    Science.gov (United States)

    Reiter, Alexander M

    2013-05-01

    This article provides an overview of equipment used for oral surgery. Specific instruments and materials used when performing relevant operative procedures are also mentioned in other articles in this issue. Copyright © 2013 Elsevier Inc. All rights reserved.

  16. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new.

  17. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new

  18. Ion beam stabilization in ion implantation equipment

    International Nuclear Information System (INIS)

    Pina, L.

    1973-01-01

    The results are presented of experimental efforts aimed at ion beam current stabilization in an equipment for ion implantation in solids. The related problems of power supplies are discussed. Measured characteristics of laboratory equipment served the determination of the parameters to be required of the supplies as well as the design and the construction of the supplies. The respective wiring diagram is presented. (J.K.)

  19. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new

  20. Regulatory process for material handling equipment

    International Nuclear Information System (INIS)

    Rajendran, S.; Agarwal, Kailash

    2017-01-01

    Atomic Energy (Factories) Rules (AEFR) 1996, Rule 35 states, 'Thorough inspection and load testing of a Crane shall be done by a Competent Person at least once every 12 months'. To adhere to this rule, BARC Safety Council constituted 'Material Handling Equipment Committee (MHEC)' under the aegis of Conventional Fire and Safety Review Committee (CFSRC) to carry out periodical inspection and certification of Material Handling Equipment (MHE), tools and tackles used in BARC Facilities at Trombay, Tarapur and Kalpakkam

  1. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, J. K.; Whang, C. K.; Lee, J. H.; Youm, K. Y.; Hong, S. H.; Choi, H. Y.; An, C.; Park, I. W.; Kim, K. S.; Lee, W. J.; Yoon, K. B.; Kim, H. W.; Lee, I. B.; Lee, C. K.; Youm, J. H.; Oho, W. H.; Choi, B. K.; Jang, K. D.

    1996-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. (author). 9 tabs., 12 figs

  2. Stud bolt handling equipment for reactor vessel

    International Nuclear Information System (INIS)

    Bunyan, T.W.

    1989-01-01

    Reactor vessel stud bolt handling equipment includes means for transferring a stud bolt to a carrier from a parking station, or vice versa. Preferably a number of stud bolts are handled simultaneously. The transfer means may include cross arms rotatable about extendable columns, and the equipment is mounted on a mobile base for movement into and out of position. Each carrier comprises a tubular socket and an expandable sleeve to grip a stud bolt. (author)

  3. Protecting electrical equipment against dust explosions

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, J

    1981-07-01

    The new ordinance on electrical equipment in hazardous areas and the new VDE 0165/6.80 have brought about significant changes in the field of electrical equipment in areas with a explosion hazard due inflammable dust. There are no constructional regulations yet in this field, and producers, planners, and users are uncertain about what measures to take. The article attempts to clear up a few points.

  4. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new.

  5. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  6. Electronic equipment for spectrometric data processing

    International Nuclear Information System (INIS)

    Antonov, L.J.; Trenev, A.M.; Todorova, E.I.; Dimitrov, V.D.

    1978-01-01

    Electronic equipment carrying out logical operations and a full set of the arithmetic operations was developed for spectrometric data processing. The flowsheet of the computing part of the device, made on the basis of a specialized integral circuit, is given. The device includes input registers, multiplexor, matrix commutator, arithmetic unit and indication unit. The equipment is rated to carry out calculations according to comparatively complex formulae in several seconds

  7. Physical protection equipment study. Final report

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    This report summarizes the work performed by MITRE for the U.S. Nuclear Regulatory Commission. The major products of this effort are a Catalog of Physical Protection Equipment, a Guide for Evaluation of Physical Protection Equipment, a book of Reference Materials, and a set of guidelines for use in the development of a methodology for measuring levels of security system effectiveness. A summary of recommendations resulting from this study is also presented

  8. Industrial Employment, Investment Equipment and Economic Growth

    OpenAIRE

    Dellas, Harris

    2000-01-01

    The industrialization of labour is the main engine of growth during the early stages of economic development. In less developed countries, equipment investment has played a less important role than non-equipment investment; and it has only proved growth enhancing when it either encountered a substantial industrial labour force or fostered a large increase in the share of industrial employment. These findings draw attention to the effects of investment on the composition of the labour force; a...

  9. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  10. Equipment system for advanced nuclear fuel development

    International Nuclear Information System (INIS)

    Kwon, Hyuk Il; Ji, C. G.; Bae, S. O.

    2002-11-01

    The purpose of the settlement of equipment system for nuclear Fuel Technology Development Facility(FTDF) is to build a seismic designed facility that can accommodate handling of nuclear materials including <20% enriched Uranium and produce HANARO fuel commercially, and also to establish the advanced common research equipment essential for the research on advanced fuel development. For this purpose, this research works were performed for the settlement of radiation protection system and facility special equipment for the FTDF, and the advanced common research equipment for the fuel fabrication and research. As a result, 11 kinds of radiation protection systems such as criticality detection and alarm system, 5 kinds of facility special equipment such as environmental pollution protection system and 5 kinds of common research equipment such as electron-beam welding machine were established. By the settlement of exclusive domestic facility for the research of advanced fuel, the fabrication and supply of HANARO fuel is possible and also can export KAERI-invented centrifugal dispersion fuel materials and its technology to the nations having research reactors in operation. For the future, the utilization of the facility will be expanded to universities, industries and other research institutes

  11. Similarity principles for equipment qualification by experience

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1988-07-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data are available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to ultimate fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application of the procedures and verification of them are given for certain cases that can be approximated by a two degree of freedom simple primary/secondary system. Other examples are based on use of actual test data available from previous qualifications. Relationships of the developments with other previously-published methods are discussed. The developments are intended to elaborate on the rather broad revised guidelines developed by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. However, the results also contribute to filling a gap that exists between the IEEE 344 methodology and that previously developed by the Seismic Qualification Utilities Group. The relationship of the results to safety margin methodology is also discussed. (author)

  12. Seismic verification of nuclear plant equipment anchorage

    International Nuclear Information System (INIS)

    Lepiece, M.; Van Vyve, J.

    1991-01-01

    More than 60% of the electrical power of Belgium is generated by seven PWR nuclear power plants. For three of them, the electro-mechanical equipment had to be reassessed after ten years of operation, because the seismic requirements were upgraded from 0.1 g to 0.17 g free field ground acceleration. The seismic requalification of the active equipment was a critical problem as the classical methods were too conservative. The approach based on the use of the past experience on the seismic behavior of nonnuclear equipment, chosen and developed by the SQUG, had to be transposed to the Belgian N.P.P. The decision of the accept-ability of equipment relies heavily on the aseismatic capacity of anchorage. The Electrical Power Research Institute (EPRI) developed the procedure and guideline for the demonstration of the aseismatic adequacy of equipment anchorage in a cost-effective and consistent manner, to support the decision by Seismic Review Team. The field inspection procedure to identify the type of fasteners and detect their possible defects and the verification procedure developed to calculate the aseismatic capacity of equipment anchorage on the strength of fasteners, the aseismatic capacity of anchorage and the comparison of the capacity with the demand are reported. (K.I.)

  13. Development of remote handling tools and equipment

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou; Ito, Akira; Fukatsu, Seiichi; Oda, Yasushi; Kajiura, Soji; Yamazaki, Seiichiro; Aoyama, Kazuo.

    1997-01-01

    The remote handling (RH) tools and equipment development in ITER focuses mainly on the welding and cutting technique, weld inspection and double-seal door which are essential factors in the replacement of in-vessel components such as divertor and blanket. The conceptual design of these RH tools and equipment has been defined through ITER engineering design activity (EDA). Similarly, elementary R and D of the RH tools and equipment have been extensively performed to accumulate a technological data base for process and performance qualification. Based on this data, fabrications of full-scale RH tools and equipment are under progress. A prototypical bore tool for pipe welding and cutting has already been fabricated and is currently undergoing integrated performance tests. This paper describes the design outline of the RH tools and equipment related to in-vessel components maintenance, and highlights the current status of RH tools and equipment development by the Japan Home Team as an ITER R and D program. This paper also includes an outline of insulation joint and quick-pipe connector development, which has also been conducted through the ITER R and D program in order to standardize RH operations and components. (author)

  14. 7 CFR 58.229 - Filler and packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Filler and packaging equipment. 58.229 Section 58.229....229 Filler and packaging equipment. All filling and packaging equipment shall be of sanitary... equipment should comply with the 3-A Sanitary Standards for equipment for Packaging Dry Milk and Dry Milk...

  15. 46 CFR 108.719 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 108.719 Section 108.719... AND EQUIPMENT Miscellaneous Equipment § 108.719 Pilot boarding equipment. (a) This section applies to... vessel must have suitable pilot boarding equipment available for use on each side of the vessel. If a...

  16. 46 CFR 109.347 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  17. 46 CFR 77.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Pilot boarding equipment. 77.40-1 Section 77.40-1... MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 77.40-1 Pilot boarding equipment. (a) This... vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on each side of the...

  18. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  19. 46 CFR 180.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Survival craft equipment. 180.175 Section 180.175... TONS) LIFESAVING EQUIPMENT AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 180.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and...

  20. 14 CFR 135.173 - Airborne thunderstorm detection equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne thunderstorm detection equipment... Aircraft and Equipment § 135.173 Airborne thunderstorm detection equipment requirements. (a) No person may... the aircraft is equipped with either approved thunderstorm detection equipment or approved airborne...

  1. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  2. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  3. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  4. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  5. Methodology for assessing laser-based equipment

    Science.gov (United States)

    Pelegrina-Bonilla, Gabriel; Hermsdorf, Jörg; Thombansen, Ulrich; Abels, Peter; Kaierle, Stefan; Neumann, Jörg

    2017-10-01

    Methodologies for the assessment of technology's maturity are widely used in industry and research. Probably the best known are technology readiness levels (TRLs), initially pioneered by the National Aeronautics and Space Administration (NASA). At the beginning, only descriptively defined TRLs existed, but over time, automated assessment techniques in the form of questionnaires emerged in order to determine TRLs. Originally TRLs targeted equipment for space applications, but the demands on industrial relevant equipment are partly different in terms of, for example, overall costs, product quantities, or the presence of competitors. Therefore, we present a commonly valid assessment methodology with the aim of assessing laser-based equipment for industrial use, in general. The assessment is carried out with the help of a questionnaire, which allows for a user-friendly and easy accessible way to monitor the progress from the lab-proven state to the application-ready product throughout the complete development period. The assessment result is presented in a multidimensional metric in order to reveal the current specific strengths and weaknesses of the equipment development process, which can be used to direct the remaining development process of the equipment in the right direction.

  6. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  7. Diagnostic imaging and radiation therapy equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs.

  8. Diagnostic imaging and radiation therapy equipment

    International Nuclear Information System (INIS)

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs

  9. Design by analysis of composite pressure equipment

    International Nuclear Information System (INIS)

    Durand, S.; Mallard, H.

    2004-01-01

    Design by analysis has been particularly pointed out by the european pressure equipment directive. Advanced mechanical analysis like finite element method are used instead of classical design by formulas or graphs. Structural behaviour can be understood by the designer. Design by analysis of metallic pressure equipments is widely used. Material behaviour or limits analysis is based on sophisticated approach (elasto-plastic analysis,..). Design by analysis of composite pressure equipments is not systematically used for industrial products. The difficulty comes from the number of information to handle. The laws of mechanics are the same for composite materials than for steel. The authors want to show that in design by analysis, the composite material approach is only more complete than the metallic approach. Mechanics is more general but not more complicated. A multi-material approach is a natural evolution of design by analysis of composite equipments. The presentation is illustrated by several industrial cases - composite vessel: analogy with metallic calculations; - composite pipes and fittings; - welding and bounding of thermoplastic equipments. (authors)

  10. Resistance welding equipment manufacturing capability for exports

    Energy Technology Data Exchange (ETDEWEB)

    Sastry, V.S.; Raju, Y.S.; Somani, A.K.; Setty, D.S.; Rameswara Raw, A.; Hermantha Rao, G.V.S.; Jayaraj, R.N. [Nuclear Fuel Complex, Dept. of Atomic Energy, Hyderbad (India)

    2010-07-01

    Indian Pressurised Heavy Water Reactor (PHWR) fuel bundle is fully welded and is unique in its design. Appendage welding, end closure welding, and end plate welding is carried out using resistance welding technique. Out of many joining processes available, resistance-welding process is reliable, environment friendly and best suitable for mass production applications. Nuclear Fuel Complex (NFC), an industrial unit is established in Hyderabad, under the aegis of the Dept of Atomic Energy to manufacture fuel for Pressurised Heavy Water Reactors. From inception, NFC has given importance for self-reliance and indigenization with respect to manufacturing process and equipment. Sintering furnaces, centreless grinders, appendage-welding machines, end-closure welding equipment and end-plate welding equipments, which were initially imported, are either indigenized or designed and manufactured in house. NFC has designed, manufactured a new appendage-welding machine for manufacturing 37 element fuel bundles. Recently NFC has bagged an order from IAEA through international bidding for design, manufacture, supply, erection and commissioning of end-closure welding equipment. The paper gives in detail the salient features of these welding equipment. (author)

  11. A Computerized Procedure linked to Virtual Equipment

    International Nuclear Information System (INIS)

    Jung, Yeon Sub; Song, Tae Young

    2011-01-01

    Digital, information, and communication technologies have change human's behavior. This is because human has limitation to memorize and process information. Human has to access other information and real time information for important decisions. Those technologies are playing important roles. Nuclear power plants cannot be exception. Many accidents in nuclear power plants result from absent or incorrect information. The information for nuclear personnel is context sensitive. They don't have enough time to verify the context sensitive information. Therefore they skip the information, as resulting in incident. Nuclear personnel are usually carrying static paper procedures during local task performance. The procedure guides them steps to follow. There is, however, no dynamic and context sensitive information in the paper. The effect of the work is evaluated once while getting permission of the work. Afterward they are not informed. The static paper is generally simplified, so that it does not show detail of equipment being manipulated. Particularly novice workers feel difficult to understand the procedure due to lack of detail. Pictures of equipment inserted in the procedure are not enough for comprehension. A computerized procedure linked with virtual equipment is one of the best solutions to increase the detail of procedure. Virtual equipment, however, has still limitation not to provide real time information, because the virtual equipment is not synchronized with real plants

  12. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Science.gov (United States)

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  13. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  14. EPERC: The European Pressure Equipment Research Council

    International Nuclear Information System (INIS)

    Darlaston, J.; McAllister, S.

    1998-01-01

    The European Pressure Equipment Research Council (EPERC) is a European Network of industries, research laboratories, inspection bodies and governmental institutions set up to foster co-operative research for the greater benefit of the European industry. The concept of a European Research Council originated at the PVRC meeting in Cannes in 1989 and since this time volunteers from the industry, research laboratories and of the European Commission Joint Research Centre, Petten have worked together to create a Statute for EPERC. In the context of the pressure equipment industry, the creation of EPERC is extremely pertinent, since in the near future, a Council directive on pressure equipment will replace the existing national regulations. In parallel to this, work is in progress for the elaboration of European Standards. It is useful to recall that ''Harmonised Standards'' will be the privileged means of complying with the Essential Safety Requirements of the directive. (author)

  15. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  16. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  17. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Yong Keun; Kim, Jung Bok

    2003-12-01

    Development of radiation monitoring equipment could be the base of domestic development of RMS. And the technique could be adapted to development of other radiation equipment of KAERI as well as hospitals and nuclear power plants. The RMS technology could be adapted to the development of precision instruments related to nuclear radiation and be the base of fundamental technology such as protein structure analysis of bio technology, development of nano advanced material and aircraft material. The technology of multi-channel readout ASIC for nuclear radiation detector, which has been imported from abroad, could be adapted to development of radiation equipment for image processing, position of detection, NDT etc., and also the technique will be expected to contribute to increase the use of radiation technology to industrial applications

  18. Methods of equipment choice in shotcreting

    Science.gov (United States)

    Sharapov, R. R.; Yadykina, V. V.; Stepanov, M. A.; Kitukov, B. A.

    2018-03-01

    Shotcrete is widely used in architecture, hydraulic engineering structures, finishing works in tunnels, arc covers and ceilings. The problem of the equipment choice in shotcreting is very important. The main issues influencing the equipment choice are quality improvement and intensification of shotcreting. Main parameters and rational limits of technological characteristic of machines used in solving different problems in shotcreting are described. It is suggested to take into account peculiarities of shotcrete mixing processes and peculiarities of applying these mixtures with compressed air kinetic energy. The described method suggests choosing a mixer with the account of energy capacity, Reynolds number and rotational frequency of the mixing drum. The suggested choice procedure of the equipment nomenclature allows decreasing exploitation costs, increasing the quality of shotcrete and shotcreting in general.

  19. Equipment for light therapy BIOFIE family

    International Nuclear Information System (INIS)

    Corcho Corcho, C. A.; Perez Garcia, A.; Herrera Rodriguez, R.

    2016-01-01

    The development experienced in the design and implementation of equipment are presented, within the subject matter of the application of low level laser and also them LED of high efficiency with therapeutic purposes in health and also in animal health, besides, the use of this technology for this application in agriculture. All the equipment that show up has been developed for the Dpto. of Bioengineer of High Politechnical Institute Jose A. Echeverria (CUJAE) in association with Dpto. of Prototypes of the same institution, under the trademark BIOFIE. Like fundamental and innovative characteristic we can make a comment that all equipment destined to health and animal health, work on continuos and modulated signal mode, using in this mode different bio frequencies. (Author)

  20. Development of superconducting equipment for fusion device

    International Nuclear Information System (INIS)

    Konno, Masayuki; Ueda, Toshio; Hiue, Hisaaki; Ohgushi, Kouzou

    1993-01-01

    At Fuji Electric Co., Ltd., the development of superconductivity was started from 1960, and superconducting equipment for fusion device has been developed for ten years. The superconducting equipment, which is developed for fusion by Fuji Electric Co., Ltd., are able to be grouped in three categories which are current lead, superconducting coil and superconducting bus-line. The current lead is an electrical feeder between a superconducting coil and an electrical power supply. The rated current of developed current lead is 30kA at continuous use and 100kA at short time use respectively. The advanced disk type coil is developed for the toroidal field coil and some coils are developed for critical current measurement. Superconductor is applied to the superconducting bus-line between the superconducting coils and the current leads, and the bus-line is being developed for the Large Helical Device. This report describes an abstract of these equipment. (author)

  1. LESSONS LEARNED IN TESTING OF SAFEGUARDS EQUIPMENT

    International Nuclear Information System (INIS)

    Pepper, S.; Farnitano, M.; Carelli, J.; Hazeltine, J.; Bailey, D.

    2001-01-01

    The International Atomic Energy Agency's (IAEA) Department of Safeguards uses complex instrumentation for the application of safeguards at nuclear facilities around the world. Often, this equipment is developed through cooperation with member state support programs because the Agency's requirements are unique and are not met by commercially available equipment. Before approving an instrument or system for routine inspection use, the IAEA subjects it to a series of tests designed to evaluate its reliability. In 2000, the IAEA began to observe operational failures in digital surveillance systems. In response to the observed failures, the IAEA worked with the equipment designer and manufacturer to determine the cause of failure. An action plan was developed to correct the performance issues and further test the systems to make sure that additional operational issues would not surface later. This paper addresses the steps taken to address operation issues related to digital image surveillance systems and the lessons learned during this process

  2. Consolidation equipment for irradiated nuclear fuel channels

    International Nuclear Information System (INIS)

    Taguchi, M.; Komatsu, Y.; Ose, T.

    1989-01-01

    The authors have developed and put into use a new type of mechanical consolidation equipment for irradiated nuclear fuel channels. This includes round-slice cutting of the top 100mm of the fuel channel with a guillotine cutter, and press cutting of the two corners of the remaining length of the fuel channel. Four guillotine blades work in combination with receiving blades arranged inside the fuel channel to cut the top 100mm, including the clips and spacers, of the fuel channel into a round slice. A press assembled in the consolidation equipment then presses the slice to achieve volume reduction. The press cutting operation uses two press cutting blades arranged inside the fuel channel and the receiving blades outside the fuel channel. The remaining length of fuel channel is cut off into L-shaped pieces by press cutting. This consolidation equipment is highly efficient because the round-slice cutting, pressing, and press cutting are all achieved by one unit

  3. Equipment support for the implementation of safeguards

    International Nuclear Information System (INIS)

    Arlt, R.; Bosler, G.; Goldfarb, M.; Schanfein, M.; Whichello, J.

    2001-01-01

    Full text: The provision of effective, reliable, and user-friendly equipment needed for the implementation of safeguards is one of the main objectives of the Division of Technical Services (SOTS) in the Department of Safeguards. As an outcome of a review by an independent external consultant firm, the instrumentation sections of the SGTS were reorganized in January 2001 into two new sections, the Section for NDA Systems and Seals (TNS) and Section for Installed Systems (TIE). Each section has 'cradle-to-grave' responsibilities for development, implementation, maintenance, and decommissioning of safeguards instruments and measurement systems. Unattended assay, monitoring and surveillance instruments are the responsibility of TIE while attended nondestructive assay (NDA) instruments and seals are handled by TNS. The principal goals of both sections are to define equipment requirements based on Departmental needs, to coordinate Support Programme tasks concerning development and implementation activities, to provide system engineering of commercial components, manage laboratory and to do field testing and prove system suitability for defined safeguards applications. In addition both sections coordinate equipment and supply needs for the Department, including acquisition, preparation, servicing, installation, commissioning, troubleshooting, maintenance and repair, ensuring their availability when needed. As required, TIE and TNS provide specialized field support to the Operations Divisions. Each section is working to standardize equipment as much as possible and reduce the number of instruments performing the same function. This reduces both inspector and technician training, required parts inventories, and overall life-cycle costs. Development based on User Needs from the Operations Divisions follows a strict quality control program that includes a thorough qualification testing procedure with the last phase being field-testing under actual facility conditions. A

  4. Process plant equipment operation, control, and reliability

    CERN Document Server

    Holloway, Michael D; Onyewuenyi, Oliver A

    2012-01-01

    "Process Plant Equipment Book is another great publication from Wiley as a reference book for final year students as well as those who will work or are working in chemical production plants and refinery…" -Associate Prof. Dr. Ramli Mat, Deputy Dean (Academic), Faculty of Chemical Engineering, Universiti Teknologi Malaysia "…give[s] readers access to both fundamental information on process plant equipment and to practical ideas, best practices and experiences of highly successful engineers from around the world… The book is illustrated throughout with numerous black & white p

  5. Equipment Qualification Data Base user manual

    International Nuclear Information System (INIS)

    Decker, Q.R.; Fackrell, L.J.; Fitch, L.R.; Meeky, O.B.

    1985-09-01

    This manual details the Equipment Qualification Data Base (EQDB), its usage, and contents. The EQDB consists of two files; the Plant Qualification File (PQF) and the Equipment Qualification File (EQF). The PQF contains plant specific environmental data and the EQF contains summaries of various test results. Two data management systems are used to manipulate the data and are discussed in this manual. SAS Institute System 2000 (S2K) is the management system for the PQF and Query Update (QU) is the operating system for the EQF. Each management system contains report writers. These writers and how to use them are discussed in detail in this manual

  6. Risk matrix model for rotating equipment

    Directory of Open Access Journals (Sweden)

    Wassan Rano Khan

    2014-07-01

    Full Text Available Different industries have various residual risk levels for their rotating equipment. Accordingly the occurrence rate of the failures and associated failure consequences categories are different. Thus, a generalized risk matrix model is developed in this study which can fit various available risk matrix standards. This generalized risk matrix will be helpful to develop new risk matrix, to fit the required risk assessment scenario for rotating equipment. Power generation system was taken as case study. It was observed that eight subsystems were under risk. Only vibration monitor system was under high risk category, while remaining seven subsystems were under serious and medium risk categories.

  7. Development of diaphragm automatic homing equipment

    International Nuclear Information System (INIS)

    Kobayashi, Hidetoshi; Yamada, Koji; Moriya, Shinichi; Koike, Jiro; Okabe, Masao; Oyama, Akihiro.

    1996-01-01

    In steam-turbine overhaul inspection, one of the most important processes is to remove rust and deposited contaminants on the surface of turbine parts, while the turbine is in operation, to recover thermal efficiency and prepare good surface conditions for color penetrant inspection. These processes generally are done by dry honing, but this generates dust. To protect laborers against these conditions, Hitachi, Ltd. has developed automatic honing equipment for the diaphragms of the nuclear steam turbine. This equipment was first used in the first annual inspection and overhaul of Hamaoka Nuclear Power Plant No.4 of Chubu Electric Power Inc. (author)

  8. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  9. Maintenence and fabrication of Electronic Equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Young Keun; Kim, Jung Bok; Lee, Sang Suk

    2004-12-01

    Development of the SPND Monitor could be the base of development of small signal processing circuits and the technique could be used to develop other precision equipment. The repair technology for high purity germanium(HPGe) detector system could be adapted to other areas where high purity detectors are used such as hospitals, universities etc. The technology of multi-channel ASIC for nuclear radiation detector, which has been imported from abroad, could be adapted to development of radiation equipment for image processing, position of detection, NDT etc., and also the technique will be expected to contribute to increase the use of radiation technology to industrial applications

  10. Radiological equipment 'Planmeca' used in dentistry

    International Nuclear Information System (INIS)

    Tuciac, Carolina

    2011-01-01

    Equipment 'Planmeca Pro Max 3D' for volumetric imaging with cone beam examine the patients under computerized tomography considering the rate 0.2-1.0 mm, digital orthopantomography, 3D cephalometry. 3D tomography image facilitates an accurate view of oral structures. It was adopted quickly, and became the basic equipment for all applications in dentistry. The Cone Beam Volumetric Tomography (CBVT), Planmeca Pro Max 3D model give the opportunity to obtain great radiological information very important for the dentist decision. (author)

  11. Conceptual design report, CEBAF basic experimental equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-04-13

    The Continuous Electron Beam Accelerator Facility (CEBAF) will be dedicated to basic research in Nuclear Physics using electrons and photons as projectiles. The accelerator configuration allows three nearly continuous beams to be delivered simultaneously in three experimental halls, which will be equipped with complementary sets of instruments: Hall A--two high resolution magnetic spectrometers; Hall B--a large acceptance magnetic spectrometer; Hall C--a high-momentum, moderate resolution, magnetic spectrometer and a variety of more dedicated instruments. This report contains a short description of the initial complement of experimental equipment to be installed in each of the three halls.

  12. RPC industries - UV and EB equipment manufacturers

    International Nuclear Information System (INIS)

    Rodrigues, A.M.

    1987-01-01

    RPC Industries has been manufacturing electron beam and ultraviolet equipment for the industrial processing of materials for more than 15 years. RPC maintains its headquarters and electron processor manufacturing plant in Hayward, California. UV equipment is made in the company's plant near Chicago. Sales offices are maintained in New York, Illinois, and California in the USA, and in Germany, Japan, Australia, Italy, Israel, and Sweden. Complete testing and pilot facilities are available in Hayward (EB) and near Chicago (UV). Described below are the basic system components, applications and advantages of RPC's UV and EB systems. (orig.)

  13. Improvements in remote equipment torquing and fastening

    International Nuclear Information System (INIS)

    Garin, J.

    1978-01-01

    Remote torquing and fastening is a requirement of generic interest for application in an environment not readily accessible to man. The developments over the last 30 years in torque-controlled equipment above 200 nm (150 ft/lb) have not been emphasized. The development of specialized subassemblies to torque and fasten equipment in a remotely controlled environment is an integral part of the Advanced Fuel Recycle Program at Oak Ridge National Laboratory. Commercially available subassemblies have been adapted into a system that would provide remote torquing and fastening in the range of 200 to 750 nm (150 to 550 ft/lb). 9 figures

  14. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  15. Data sharing report characterization of population 7: Personal protective equipment, dry active waste, and miscellaneous debris, surveillance and maintenance project Oak Ridge National Laboratory Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Harpenau, Evan M. [Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)

    2013-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

  16. UV Tanning Equipment | Radiation Protection | US EPA

    Science.gov (United States)

    2017-08-07

    Sun lamps and tanning equipment emit ultraviolet (UV) rays. People who are exposed to UV rays over a long period of time are more likely to develop skin cancer. People with light skin are in more danger because their skin is more sensitive to UV rays.

  17. TECHNICAL EQUIPMENT FOR SORTING APPLES BY SIZE

    Directory of Open Access Journals (Sweden)

    Vasilica Ştefan

    2012-01-01

    Full Text Available Need to increase the competitiveness of semi-subsistence farms, by valorisation of the fruits, led to research for designing of an equipment for sorting apples by size, in order to meet market requirement, pricing according to the size of the fruits.

  18. 49 CFR 374.313 - Equipment.

    Science.gov (United States)

    2010-10-01

    .... Each bus (except in commuter service) seating more than 14 passengers (not including the driver) shall..., DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS PASSENGER CARRIER REGULATIONS Adequacy of Intercity Motor Common Carrier Passenger Service § 374.313 Equipment. (a) Temperature control. A...

  19. OEE and equipment effectiveness : an evaluation

    NARCIS (Netherlands)

    Ron, de A.J.; Rooda, J.E.

    2006-01-01

    The overall equipment effectiveness or efficiency (OEE) is a metric that has been accepted in the semiconductor industry. OEE is simple and clear, and standards and guidelines have been developed. Nonetheless, the literature indicates imperfections in applying OEE with regard to the time base and

  20. Maintenance optimization plan for essential equipment reliability

    International Nuclear Information System (INIS)

    Steffen, D.H.

    1996-02-01

    The Maintenance Optimization Plan (MOP) for Essential Equipment Reliability will furnish Tank Waste Remediation System (TWRS) management with a pro-active, forward-thinking process for maintaining essential structures, systems, and components (ESSC) at the Hanford Site tank farms in their designed condition, and to ensure optimum ESSC availability and reliability

  1. EQuIP-ped for Success

    Science.gov (United States)

    Ewing, Molly

    2015-01-01

    The Educators Evaluating the Quality of Instructional Products (EQuIP) Rubric for science is a new tool for science educators that provides criteria by which to examine the alignment and overall quality of lessons and units with respect to the "Next Generation Science Standards" ("NGSS"). The rubric criteria are divided into…

  2. The LHC's equipment all in step

    CERN Multimedia

    2005-01-01

    Over 80% of the control equipment for the LHC will be connected by a special communication network known as WorldFIP, which has been chosen for its very precise timing, excellent operating performance and robustness in difficult environments. Over 350 kilometres of this network are currently being installed in the LHC tunnel and checked for compliance with the required standards.

  3. 7 CFR 3016.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment. 3016.32 Section 3016.32 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL...

  4. Engineering study of riser equipment contamination

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Study was to evaluate the current equipment and operating procedures to determine if changes could be made to improve ALARA and evaluate the feasibility of implementing the proposed solutions. As part of this study input from the cognizant characterization engineers and operating sampling crews was obtained and evaluated for ALARA improvements

  5. 21 CFR 226.30 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contamination, including cross-contamination from manufacturing operations. (d) Be suitably grounded... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment. 226.30 Section 226.30 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL...

  6. New Equipping Strategies for Combat Support Hospitals

    Science.gov (United States)

    2010-01-01

    Combat and Doctrine Development and COL Timothy Lamb , supported by MAJ Gary Cooper, included members of our team in visits to Sierra Army Depot and...aspect of improving materiel stew - ardship is improving the quality of data related to the procurement, maintenance, and upgrading of equipment

  7. The first equipment for protection from nanoparticles

    International Nuclear Information System (INIS)

    Faure, Louis-Paul; Bombardier, Pierre; Reinwalt, Jean-Marie

    2009-01-01

    How can we guarantee the containment of ultrafine particles but also implement the ergonomic and handling constraints voiced by researchers? This is the equation that the engineers at FAURE INGENIERIE had to resolve to develop the first barrier protection equipment for nanoparticle research.

  8. Optimization of safety equipment outages improves safety

    International Nuclear Information System (INIS)

    Cepin, Marko

    2002-01-01

    Testing and maintenance activities of safety equipment in nuclear power plants are an important potential for risk and cost reduction. An optimization method is presented based on the simulated annealing algorithm. The method determines the optimal schedule of safety equipment outages due to testing and maintenance based on minimization of selected risk measure. The mean value of the selected time dependent risk measure represents the objective function of the optimization. The time dependent function of the selected risk measure is obtained from probabilistic safety assessment, i.e. the fault tree analysis at the system level and the fault tree/event tree analysis at the plant level, both extended with inclusion of time requirements. Results of several examples showed that it is possible to reduce risk by application of the proposed method. Because of large uncertainties in the probabilistic safety assessment, the most important result of the method may not be a selection of the most suitable schedule of safety equipment outages among those, which results in similarly low risk. But, it may be a prevention of such schedules of safety equipment outages, which result in high risk. Such finding increases the importance of evaluation speed versus the requirement of getting always the global optimum no matter if it is only slightly better that certain local one

  9. A range of equipment for dental radiography

    International Nuclear Information System (INIS)

    Bergman, G.P.M.; Clement, S.L.

    1980-01-01

    A brief review of the history of dental radiography is followed by a description of the latest Philips equipment, ranging from compact units for intra-oral radiography to advanced systems for panoramic techniques and skull radiography. The advantages of automatic exposure control and automatic film processing are also discussed. In conclusion, some probable future trends are forecast. (Auth.)

  10. 22 CFR 226.34 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Property Standards § 226.34 Equipment. (a) Unless the agreement provides... to provide services to non-Federal outside organizations for a fee that is less than private...

  11. Spent fuel storage process equipment development

    International Nuclear Information System (INIS)

    Park, Hyun Soo; Lee, Jae Sol; Yoo, Jae Hyung

    1990-02-01

    Nuclear energy which is a major energy source of national energy supply entails spent fuels. Spent fuels which are high level radioactive meterials, are tricky to manage and need high technology. The objectives of this study are to establish and develop key elements of spent fuel management technologies: handling equipment and maintenance, process automation technology, colling system, and cleanup system. (author)

  12. 48 CFR 870.112 - Telecommunications equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Telecommunications... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.112 Telecommunications... specifications for telecommunications equipment, as defined in VA manual MP-6, Part VIII (available at any VA...

  13. An Evaluation System for Foodservice Equipment

    Science.gov (United States)

    1985-10-01

    of the machine, as eggs , pancakes, etc. cannot be cooked oo a grooved surface. A grooved suriaca will be tilted towards tha grease trough for...Refrigerator Specialty Units PREPARATION EQUIPMENT Burger Forming Machine Electric Meatball Machine breading Machine Crepe Machine Breaded/Sifter

  14. Electronic detecting equipment in the Camac standard

    International Nuclear Information System (INIS)

    Basiladze, S.G.

    1981-01-01

    Basic tends of development of electron detecting equipment of modern facilities for experiments in nuclear physics are considered. Special attention is paid to developments of specialized hybrid integrated circuits, specialized processors for selection of events, usage of integrated circuits of memories in detecting units as well as to prospects of developing nuclear electronics standards [ru

  15. 78 FR 59623 - Emergency Medical Equipment

    Science.gov (United States)

    2013-09-27

    ... accordance with the FAA master minimum equipment list does not adversely affect aviation safety. This action... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Parts 121 and 135 [Docket No... inoperative Emergency Medical Kit (EMK) or automated external defibrillator (AED). A copy of Master Minimum...

  16. 7 CFR 3019.34 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 3019... accounting records shall be investigated to determine the causes of the difference. The recipient shall, in... requirement for the equipment exists in other Federal agencies. The Federal awarding agency shall issue...

  17. 24 CFR 84.34 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER... the physical inspection and those shown in the accounting records shall be investigated to determine... requirement for the equipment exists in other Federal agencies. HUD shall issue instructions to the recipient...

  18. A Guide for Equipping Industrial Arts Facilities.

    Science.gov (United States)

    American Industrial Arts Association, Washington, DC. Equipment Guide Committee.

    A guide for planning new and revising existing industrial arts facilities which gives a listing of tools and equipment recommended for each of the major areas of instruction (automotive and power mechanics, ceramics, drafting, electronics, elementary, general shop, graphic arts, metalworking, plastics, and woodworking). General descriptions and…

  19. Radiation protection calculations for diagnostic medical equipment

    International Nuclear Information System (INIS)

    Klueter, R.

    1992-01-01

    The standards DIN 6812 and DIN 6844 define the radiation protection requirements to be met by biomedical radiography equipment or systems for nuclear medicine. The paper explains the use of a specific computer program for radiation protection calculations. The program offers menu-controlled calculation, with free choice of the relevant nuclides. (DG) [de

  20. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  1. Magnet measuring equipment of SC2

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    Checking the positioning of the magnet measuring equipment installed between the poles of SC2. The steel structure in front of the magnet is designed to house the rotary condenser and to shield it from the stray magnetic field of the accelerator.

  2. Magnet measuring equipment of SC2

    CERN Multimedia

    1974-01-01

    Checking the positioning of the magnet measuring equipment installed between the poles of SC2. The steel structure in front of the magnet is designed to house the rotary condenser and to shield it from the stray magnetic field of the accelerator. On the left, Marinus van Gulik. (See Photo Archive 7402005 and Annual Report 1974, p. 44.)

  3. USING DIDACTIC EQUIPMENT IN VOCATIONAL SUBJECTS TEACHING

    OpenAIRE

    JIROUT, Jiří

    2011-01-01

    Baccalaureate Work ?Using Didactic Equipment In Vocational Subjects Teaching? describes various methods of teaching and using didactic engineering in education. Theoretic part describes general aspects of using didactic engineering, teaching methods a and ways how to use didactic engineering in teaching vocational subjects. Practical part finds how students appreciate using modern didactic aids and engineering in education.

  4. Robust control investigations for equipment loaded panels

    DEFF Research Database (Denmark)

    Aglietti, G.S.; Langley, R.S.; Rogers, E.

    1998-01-01

    This paper develops a modelling technique for equipment load panels which directly produces (adequate) models of the underlying dynamics on which to base robust controller design/evaluations. This technique is based on the use of the Lagrange's equations of motion and the resulting models...

  5. The first equipment for protection from nanoparticles

    Energy Technology Data Exchange (ETDEWEB)

    Faure, Louis-Paul; Bombardier, Pierre; Reinwalt, Jean-Marie [FAURE INGENIERIE S.A., Parc Technologique des Fontaines, Chemin des Fontaines, F-38190 Bernin (France)], E-mail: laboratoire@faureingenierie.com

    2009-05-01

    How can we guarantee the containment of ultrafine particles but also implement the ergonomic and handling constraints voiced by researchers? This is the equation that the engineers at FAURE INGENIERIE had to resolve to develop the first barrier protection equipment for nanoparticle research.

  6. Longevity and Depreciation of Audiovisual Equipment.

    Science.gov (United States)

    Post, Richard

    1987-01-01

    Describes results of survey of media service directors at public universities in Ohio to determine the expected longevity of audiovisual equipment. Use of the Delphi technique for estimates is explained, results are compared with an earlier survey done in 1977, and use of spreadsheet software to calculate depreciation is discussed. (LRW)

  7. Design of experimental equipment at CRNL

    International Nuclear Information System (INIS)

    Godden, B.

    1976-01-01

    The Plant Design Division provides a design service to the research and development effort at CRNL. Severe constraints, both environmentally and spatially, are placed on the design of special equipment. Several examples are given. Finally, the use of automated drafting systems is described. (author)

  8. Mechanical equipment for magnet measurement and alignment

    International Nuclear Information System (INIS)

    Harvey, A.

    1992-05-01

    The mechanical equipment for measuring and aligning (or fiducializing) magnets is described by reference to devices designed and built by a number of laboratories. Some of these are now available commercially. The descriptions are supplemented by a list of representative sources of hardware

  9. Diagnosis of Equipment Failures by Pattern Recognition

    DEFF Research Database (Denmark)

    Pau, L. F.

    1974-01-01

    The main problems in relation to automatic fault finding and diagnosis in equipments or production systems are discussed: 1) compression of the syndrome and observation spaces for better discrimination between failure modes; 2) simultaneous display of the failure patterns and the failure instants...

  10. 36 CFR 1210.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 1210.34 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... data, including date of disposal and sales price or the method used to determine current fair market... the following standards. For equipment with a current per unit fair market value of $5,000 or more...

  11. Gamma scanning equipment for nuclear safeguards

    International Nuclear Information System (INIS)

    De Grandi, G.; Stanchi, L.

    1975-01-01

    Many reasons justify the use of gamma techniques in the field of nuclear safeguards. The paper describes electronic equipment for gamma-scanning of non-irradiated fuel elements. The control of the operation is completely digital and driven by a minicomputer and gives more accurate results in respect of an analog chain which has been successfully used in fuel element manufacturing plants

  12. Automated technological equipment-robot complexes

    International Nuclear Information System (INIS)

    Zhitomirskii, S.V.; Samorodskikh, B.L.

    1984-01-01

    This paper surveys the types of automated technological equipment robot complexes. The principal elements of such complexes are described. Complexes are divided into two principal groups: those using simultaneously acting robots, and those using successively acting robots. The great variety of types of robots using successive action is then described

  13. 14 CFR 125.355 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 125.355 Section 125.355...: AIRPLANES HAVING A SEATING CAPACITY OF 20 OR MORE PASSENGERS OR A MAXIMUM PAYLOAD CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Flight Release Rules § 125.355 Airplane...

  14. 21 CFR 1020.32 - Fluoroscopic equipment.

    Science.gov (United States)

    2010-04-01

    ... manufacturer shall provide to users, under § 1020.30(h)(1)(i), precautions concerning the importance of remote... specified in § 1020.32(d)(1)(v). (iii) Equipment provided with both an AERC mode and a manual mode shall not... shall be operable only when continuous manual activation is provided by the operator. A continuous...

  15. Image quality analysis of digital mammographic equipments

    Energy Technology Data Exchange (ETDEWEB)

    Mayo, P.; Pascual, A.; Verdu, G. [Valencia Univ. Politecnica, Chemical and Nuclear Engineering Dept. (Spain); Rodenas, F. [Valencia Univ. Politecnica, Applied Mathematical Dept. (Spain); Campayo, J.M. [Valencia Univ. Hospital Clinico, Servicio de Radiofisica y Proteccion Radiologica (Spain); Villaescusa, J.I. [Hospital Clinico La Fe, Servicio de Proteccion Radiologica, Valencia (Spain)

    2006-07-01

    The image quality assessment of a radiographic phantom image is one of the fundamental points in a complete quality control programme. The good functioning result of all the process must be an image with an appropriate quality to carry out a suitable diagnostic. Nowadays, the digital radiographic equipments are replacing the traditional film-screen equipments and it is necessary to update the parameters to guarantee the quality of the process. Contrast-detail phantoms are applied to digital radiography to study the threshold contrast detail sensitivity at operation conditions of the equipment. The phantom that is studied in this work is C.D.M.A.M. 3.4, which facilitates the evaluation of image contrast and detail resolution. One of the most extended indexes to measure the image quality in an objective way is the Image Quality Figure (I.Q.F.). This parameter is useful to calculate the image quality taking into account the contrast and detail resolution of the image analysed. The contrast-detail curve is useful as a measure of the image quality too, because it is a graphical representation in which the hole thickness and diameter are plotted for each contrast-detail combination detected in the radiographic image of the phantom. It is useful for the comparison of the functioning of different radiographic image systems, for phantom images under the same exposition conditions. The aim of this work is to study the image quality of different images contrast-detail phantom C.D.M.A.M. 3.4, carrying out the automatic detection of the contrast-detail combination and to establish a parameter which characterize in an objective way the mammographic image quality. This is useful to compare images obtained at different digital mammographic equipments to study the functioning of the equipments. (authors)

  16. Image quality analysis of digital mammographic equipments

    International Nuclear Information System (INIS)

    Mayo, P.; Pascual, A.; Verdu, G.; Rodenas, F.; Campayo, J.M.; Villaescusa, J.I.

    2006-01-01

    The image quality assessment of a radiographic phantom image is one of the fundamental points in a complete quality control programme. The good functioning result of all the process must be an image with an appropriate quality to carry out a suitable diagnostic. Nowadays, the digital radiographic equipments are replacing the traditional film-screen equipments and it is necessary to update the parameters to guarantee the quality of the process. Contrast-detail phantoms are applied to digital radiography to study the threshold contrast detail sensitivity at operation conditions of the equipment. The phantom that is studied in this work is C.D.M.A.M. 3.4, which facilitates the evaluation of image contrast and detail resolution. One of the most extended indexes to measure the image quality in an objective way is the Image Quality Figure (I.Q.F.). This parameter is useful to calculate the image quality taking into account the contrast and detail resolution of the image analysed. The contrast-detail curve is useful as a measure of the image quality too, because it is a graphical representation in which the hole thickness and diameter are plotted for each contrast-detail combination detected in the radiographic image of the phantom. It is useful for the comparison of the functioning of different radiographic image systems, for phantom images under the same exposition conditions. The aim of this work is to study the image quality of different images contrast-detail phantom C.D.M.A.M. 3.4, carrying out the automatic detection of the contrast-detail combination and to establish a parameter which characterize in an objective way the mammographic image quality. This is useful to compare images obtained at different digital mammographic equipments to study the functioning of the equipments. (authors)

  17. Riser equipment decontamination engineering task plan; TOPICAL

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  18. Riser equipment decontamination engineering task plan

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  19. 7 CFR 1753.68 - Purchasing special equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Purchasing special equipment. 1753.68 Section 1753.68... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of Special Equipment § 1753.68 Purchasing special equipment. (a) General. (1) Equipment purchases are...

  20. 14 CFR 25.1441 - Oxygen equipment and supply.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 25.1441... Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, the... oxygen available in each source of supply. (d) The oxygen flow rate and the oxygen equipment for...

  1. 30 CFR 72.520 - Diesel equipment inventory.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Diesel equipment inventory. 72.520 Section 72... Mines § 72.520 Diesel equipment inventory. (a) The operator of each mine that utilizes diesel equipment underground, shall prepare and submit in writing to the District Manager, an inventory of diesel equipment...

  2. 23 CFR 635.106 - Use of publicly owned equipment.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.106 Use of publicly owned equipment. (a) Publicly owned equipment should not normally compete with privately owned equipment on a project to be let to contract... publicly owned equipment is to be made available in connection with construction work to be let to contract...

  3. 33 CFR 105.250 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... include procedures for identifying and responding to security system and equipment failures or...

  4. 33 CFR 104.260 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... procedures for identifying and responding to security system and equipment failures or malfunctions. ...

  5. 46 CFR 32.90-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Pilot boarding equipment. 32.90-1 Section 32.90-1... REQUIREMENTS Pilot Boarding Equipment § 32.90-1 Pilot boarding equipment. (a) This section applies to each... must have suitable pilot boarding equipment available for use on each side of the vessel. If a vessel...

  6. 46 CFR 96.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 96.40-1 Section 96.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 96.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  7. 46 CFR 195.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Pilot boarding equipment. 195.40-1 Section 195.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 195.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  8. 45 CFR 95.707 - Equipment management and disposition.

    Science.gov (United States)

    2010-10-01

    ... participation in the costs of replacement equipment shall be limited to the additional outlay. (4) If the... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment management and disposition. 95.707... PROGRAMS) Equipment Acquired Under Public Assistance Programs § 95.707 Equipment management and disposition...

  9. 32 CFR 34.21 - Real property and equipment.

    Science.gov (United States)

    2010-07-01

    ... original equipment as trade-in or sell it and use the proceeds to offset the costs of the replacement... request approval to use equipment as trade-in or offset for replacement equipment (see paragraph (e)(1)(i... 32 National Defense 1 2010-07-01 2010-07-01 false Real property and equipment. 34.21 Section 34.21...

  10. 24 CFR 965.306 - Energy conservation equipment and practices.

    Science.gov (United States)

    2010-04-01

    ... Measures § 965.306 Energy conservation equipment and practices. In purchasing original or, when needed, replacement equipment, PHAs shall acquire only equipment that meets or exceeds the minimum efficiency... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Energy conservation equipment and...

  11. 40 CFR 63.1363 - Standards for equipment leaks.

    Science.gov (United States)

    2010-07-01

    ... the replacement equipment and the actual date of delivery of the replacement equipment. (E) The date... heavy liquid service. Information, data, and analysis used to determine that a piece of equipment or... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Standards for equipment leaks. 63.1363...

  12. 46 CFR 117.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Survival craft equipment. 117.175 Section 117.175... AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 117.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and efficient for the purpose it...

  13. 7 CFR 58.419 - Curd mill and miscellaneous equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Curd mill and miscellaneous equipment. 58.419 Section... Service 1 Equipment and Utensils § 58.419 Curd mill and miscellaneous equipment. Knives, hand rakes... of the curd mill should be of stainless steel. All pieces of equipment shall be so constructed that...

  14. 41 CFR 109-50.4801 - Equipment Gift Agreement.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment Gift Agreement... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.48-Exhibits § 109-50.4801 Equipment Gift Agreement. (a) The following Equipment Gift Agreement format will be used to provide gifts of excess and/or surplus equipment...

  15. 30 CFR 77.410 - Mobile equipment; automatic warning devices.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Mobile equipment; automatic warning devices. 77... UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.410 Mobile equipment; automatic warning devices. (a) Mobile equipment such as front-end loaders, forklifts, tractors, graders, and trucks, except...

  16. 47 CFR 36.126 - Circuit equipment-Category 4.

    Science.gov (United States)

    2010-10-01

    ... separating property associated with special services, circuit equipment included in Categories 4.12 (other... Equipment Excluding Wideband—Category 4.13—The cost of Circuit Equipment associated with exchange line plant... 47 Telecommunication 2 2010-10-01 2010-10-01 false Circuit equipment-Category 4. 36.126 Section 36...

  17. 49 CFR 238.230 - Safety appliances-new equipment.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Safety appliances-new equipment. 238.230 Section... I Passenger Equipment § 238.230 Safety appliances—new equipment. (a) Applicability. This section..., 2007, that is equipped with a safety appliance, required by the “manner of application” provisions in...

  18. Three equipment concepts for the Fusion Engineering Device

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Masson, L.S.; Watts, K.D.; Grant, N.R.; Kuban, D.P.

    1982-01-01

    Maintenance equipment which is needed to remotely handle fusion device components is being conceptually developed for the Fusion Engineering Design Center. This will test the assumption that these equipment needs can be satisfied by present technology. In addition, the development of equipment conceptual designs will allow for cost estimates which have a much higher degree of certainty. Accurate equipment costs will be useful for assessments which trade off gains in availability as a function of increased investments in maintenance equipment

  19. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  20. Equipment abnormality monitoring method and device therefor

    International Nuclear Information System (INIS)

    Yamada, Izumi; Asakura, Yamato; Uemura, Hiroshi; Uchida, Shunsuke; Oyamada, Osamu; Oyobe, Koji.

    1994-01-01

    In the present invention, it is judged whether the operation state of equipments used in a plant are normal or not by using learning performances. That is, a plurality of monitoring parameters are measured for an equipment. Previously determined monitoring parameters are extracted. A leaning mode or a monitoring mode is selected. In the leaning mode, based on the values of previously determined monitoring parameters, values of other monitoring parameters during normal states are learned. In the monitoring mode, based on the values of the previously determined monitoring parameters, typical values of other leaned monitoring parameters are outputted. The typical values of other normal monitoring parameters after learning and the values of other parameters at the present time are compared. If the values of the other parameters at the present time are out of normal range, it is judged as abnormal, and the result is alarmed and displayed. (I.S.)