WorldWideScience

Sample records for lram project documentation

  1. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  2. Lifecycle management for nuclear engineering project documents

    International Nuclear Information System (INIS)

    Zhang Li; Zhang Ming; Zhang Ling

    2010-01-01

    The nuclear engineering project documents with great quantity and various types of data, in which the relationships of each document are complex, the edition of document update frequently, are managed difficultly. While the safety of project even the nuclear safety is threatened seriously by the false documents and mistakes. In order to ensure the integrality, veracity and validity of project documents, the lifecycle theory of document is applied to build documents center, record center, structure and database of document lifecycle management system. And the lifecycle management is used to the documents of nuclear engineering projects from the production to pigeonhole, to satisfy the quality requirement of nuclear engineering projects. (authors)

  3. Human Document Project

    NARCIS (Netherlands)

    de Vries, Jeroen; Abelmann, Leon; Manz, A; Elwenspoek, Michael Curt

    2012-01-01

    “The Human Document Project‿ is a project which tries to answer all of the questions related to preserving information about the human race for tens of generations of humans to come or maybe even for a future intelligence which can emerge in the coming thousands of years. This document mainly

  4. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  5. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  6. Leveraging Text Content for Management of Construction Project Documents

    Science.gov (United States)

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  7. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  8. Making project documentation a positive tool for management

    International Nuclear Information System (INIS)

    Shirley, C.G.

    1986-01-01

    Sandia National Laboratories is constructing Particle Beam Fusion Accelerator II, a research facility built as a major project of the U.S. Department of Energy and theoretically capable of controlled nuclear fusion. To manage technical development, the project team has evolved a documentation system with both conventional and unconventional elements. Project documentation is functional because it is usable and authoritative. Usability results from layering by audience and purpose, appropriate sequence and format, accessibility, directness, and currency. Authority results from comprehensiveness, document control, insistence on written requirements, and consistency in applying procedures. As basic communication models illustrate, every document needs a producer, a recipient, a subject, and a feedback path. Managers can promote functional documentation by planning for feedback, using fulltime documentors wisely, setting priorities, planning for effective data collection, and treating documentation as a subproject

  9. Performance assurance of the re-applying project documentation

    Science.gov (United States)

    Kozlova, Olga

    2017-10-01

    Usage of the re-applying project documentation is cost effective measure. Saving of budgetary funds for purchases for development of new project documentation occurs by means of it. It also becomes possible to consider better decisions and prevent the repetition of mistakes. Nowadays, state authorities in construction management are forming separate institute for re-applying project documentation. The article shows the main tasks of such events and the issues to be solved for achievement of a high positive result.

  10. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  11. Spent Nuclear Fuel Project document control and Records Management Program Description

    International Nuclear Information System (INIS)

    MARTIN, B.M.

    2000-01-01

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document

  12. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  13. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  14. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  15. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  16. Databases in the documentation management for big industrial projects

    International Nuclear Information System (INIS)

    Cauchet, A.; Chevillard, F.; Parisot, Y.; Tirefort, C.

    1990-05-01

    The documentation management of a big industrial project involves a continuous update of information, both in the study and realization phase or in the operation phase. The organization of the technical documentation for big industrial projects requests complex information systems. In the first part of this paper are presented the methods appropriate for the analysis of documentation management procedures and in the second part are presented the tools by the combination of which a documentation system for the user is provided. The case of the documentation centres for the Hague reprocessing plant is described

  17. Guidance and Control Software Project Data - Volume 1: Planning Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  18. Guidance and Control Software Project Data - Volume 2: Development Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  19. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P. M.

    2001-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6)

  20. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P.

    2000-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (CRWMS M and O 2000b) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) engineering design basis in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The engineering design basis documented in the PDD is to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the engineering design basis from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the engineering design basis captured in the SDDs and the design requirements captured in U.S. Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 2-1, the MGR Architecture (Section 4.1),the Engineering Design Bases (Section 5), and the Controlled Project Assumptions (Section 6)

  1. Advanced Air Transportation Technologies Project, Final Document Collection

    Science.gov (United States)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  2. Guidance and Control Software Project Data - Volume 3: Verification Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the verification documents from the GCS project. Volume 3 contains four appendices: A. Software Verification Cases and Procedures for the Guidance and Control Software Project; B. Software Verification Results for the Pluto Implementation of the Guidance and Control Software; C. Review Records for the Pluto Implementation of the Guidance and Control Software; and D. Test Results Logs for the Pluto Implementation of the Guidance and Control Software.

  3. The Darfur Atrocities Documentation Project

    Science.gov (United States)

    Totten, Samuel

    2004-01-01

    One of the many important aspects of the Darfur Atrocities Documentation Project was that it set a precedent for what the U.S. and/or other nations can, and should do, when future cases of potential genocide arise. Far too often in the recent past, the international community (the United Nations, individual governments, many nongovernmental…

  4. An SEU tolerant memory cell derived from fundamental studies of SEU mechanisms in SRAM

    International Nuclear Information System (INIS)

    Weaver, H.T.; Axness, C.L.; McBrayer, J.D.; Browning, J.S.; Fu, J.S.; Ochoa, A. Jr.; Koga, R.

    1987-01-01

    A new single event upset (SEU) hardening concept, an LRAM cell, is demonstrated theoretically and experimentally. Decoupling resistors in the LRAM are used only to protect against the short n-channel transient; longer persisting pulses are reduced in magnitude by a voltage divider, a basically new concept for SEU protection. In such a design, smaller resistors provide SEU tolerance, allowing higher performance, hardened memories. As basis for the LRAM idea, techniques were developed to measure time constants for ion induced voltage transients in conventional static random access memories, SRAM. Time constants of 0.8 and 6.3 nsec were measured for transients following strikes at the n- and p-channel drains, respectively - primary areas of SEU sensitivity. These data are the first transient time measurements on full memory chips and the large difference is fundamental to the LRAM concept. Test structures of the new design exhibit equivalent SEU tolerance with resistors 5-to-10 times smaller than currently used in SRAM. Our advanced transport-plus-circuit numerical simulations of the SEU process predicted this result and account for the LRAM experiments, as well as a variety of experiments on conventional SRAM

  5. Making project documentation a positive tool for management

    International Nuclear Information System (INIS)

    Shirley, C.G.

    1985-01-01

    Since 1980, Sandia National Laboratory has been designing and constructing Particle Beam Fusion Accelerator II. One managerial challenge of a large project is the problem of handling information. The scope of the PBFA-II projet may be gauged by its cost: $19.4 million for the accelerator itself, $9.5 million for buildings and standard utilities, and $9.6 million for specialized utilities and support systems. The first need of the project at its outset, then, was communication, and this remains a chief function of the CPO. If the nature or magnitude of the risk changes in any one area, the entire project team must know. If a design is changed, persons working on interdependent efforts must know. Some of this communication takes place naturally and informally. But project procedures must guarantee that all important communication is received by all necessary people, that the communication creates accountability, and that management receives timely, accurate reports. To put it another way, important communication requires project documentation. Documentation is both a record of the project and a tool for management

  6. Project W-320, 241-C-106 sluicing supporting documentation bibliography

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the listing of documentation used to develop, or in support of Project W-320, readily retrievable. All documents are sorted by document number and list the document type. Tank 241-C-106 has been included on the High Heat Load Watch List

  7. Towards optimal design of locally resonant acoustic metamaterials

    NARCIS (Netherlands)

    Krushynska, A.O.; Kouznetsova, V.; Geers, M.G.D.

    2014-01-01

    The paper presents an in-depth analysis of solid locally resonant acoustic metamaterials (LRAMs) consisting of rubber-coated inclusions. Dispersion properties of two-dimensional LRAMs are studied by means of finite-element modal analysis. For an incompressible rubber, only one practically important

  8. Magnetorheological elastomer vibration isolation of tunable three-dimensional locally resonant acoustic metamaterial

    Science.gov (United States)

    Xu, Zhenlong; Tong, Jie; Wu, Fugen

    2018-03-01

    Magnetorheological elastomers (MREs) are used as cladding in three-dimensional locally resonant acoustic metamaterial (LRAM) cores. The metamaterial units are combined into a vibration isolator. Two types of LRAMs, namely, cubic and spherical kernels, are constructed. The finite element method is used to analyze the elastic band structures, transmittances, and vibration modes of the incident elastic waves. Results show that the central position and width of the LRAM elastic bandgap can be controlled by the application of an external magnetic field; furthermore, they can be adjusted by changing the MRE cladding thickness. These methods contribute to the design of metamaterial MRE vibration isolators.

  9. Commercial agreements and documentation relevant for project financing renewable energy schemes

    International Nuclear Information System (INIS)

    1997-01-01

    Renewable energy projects covered by the NFFO Orders are distinguished by the fact that the key contract in any project is in effect a standard form contract in the form of the Power Purchase Agreement with the Non-Fossil Purchasing Agency Limited (''NFPA''). However our research has indicated that general contract standardization is unlikely to be practicable in the short term, although it is thought that the production of a range of specimen documents in the context of this study with input from various representative industry associations could lead to a more consistent approach to the negotiation and structuring of projects and facilitate the presentation of projects at the funding stage. We have produced a suite of documents which are specimens of the sorts of agreements that lenders are likely to find acceptable. The range of documents which we have produced covers the principal contractual arrangements for a typical renewable energy project (including full text or abridged agreements), for a land lease and for agreements for design and build, operation and maintenance, waste supply, wind lease, landfill gas, and forestry residue supply. We have produced an insurance scope of cover and financing documentation including a due diligence check list, term sheet, and a facility agreement with related security documentation. (author)

  10. Documentation assessment, Project C-018H, 200-E area effluent treatment facility

    International Nuclear Information System (INIS)

    Peres, M.W.; Connor, M.D.; Mertelendy, J.I.

    1994-01-01

    Project C-018H is one of the fourteen subprojects to the Hanford Environmental Compliance (HEC) Project. Project C-018H provides treatment and disposal for the 242-A Evaporator and PUREX plant process condensate waste streams. This project used the Integrated Management Team (IMT) approach proposed by RL. The IMT approach included all affected organizations on the project team to coordinate and execute all required project tasks, while striving to integrate and satisfy all technical, operational, functional, and organizational objectives. The HEC Projects were initiated in 1989. Project C-018H began in early 1990, with completion of construction currently targeted for mid-1995. This assessment was performed to evaluate the effectiveness of the management control on design documents and quality assurance records developed and submitted for processing, use, and retention for the Project. The assessment focused primarily on the overall adequacy and quality of the design documentation currently being submitted to the project document control function

  11. SNF fuel retrieval sub project safety analysis document

    International Nuclear Information System (INIS)

    BERGMANN, D.W.

    1999-01-01

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed

  12. SNF fuel retrieval sub project safety analysis document

    Energy Technology Data Exchange (ETDEWEB)

    BERGMANN, D.W.

    1999-02-24

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed.

  13. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  14. Perceived Effects of Prevalent Errors in Contract Documents on Construction Projects

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2018-03-01

    Full Text Available One of the highly rated causes of poor performance is errors in contract documents. The objectives of this study are to investigate the prevalent errors in contract documents and their effects on construction projects. Questionnaire survey and 51 case study projects (mixed method were adopted for the study. The study also involved the use of Delphi technique to extract the possible errors that may be contained in contract documents; it did not however constitute the empirical data for the study. The sample of the study consists of 985 consulting and 275 contracting firms that engaged in the construction of building projects that were completed between 2013 and 2016 and were above the ground floor. The two-stage stratified random sampling technique was adopted for the study. The data for the study were analysed with descriptive and inferential statistics (based on Shapiro-Wilk’s test. The results of the study indicate that errors in contract documents were moderately prevalent. However, overmeasurement in bill of quantities was prevalent in private, institutional and management procured projects. Traditionally procured projects contain 68% of the errors in contract documents among the procurement methods. Drawings contain the highest number of errors, followed by bill of quantities and specifications. The severe effects of errors in contract documents were structural collapse, deterioration of buildings and contractors’ claims among others. The result of the study implies that, management procurement method is the route to error minimization in developing countries, but it may need to be backed by law and guarded against overmeasurement.

  15. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  16. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  17. Project W-441 cold vacuum drying facility design requirements document

    International Nuclear Information System (INIS)

    O'Neill, C.T.

    1997-01-01

    This document has been prepared and is being released for Project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility. This document sets forth the physical design criteria, Codes and Standards, and functional requirements that were used in the design of the Cold Vacuum Drying Facility. This document contains section 3, 4, 6, and 9 of the Cold Vacuum Drying Facility Design Requirements Document. The remaining sections will be issued at a later date. The purpose of the Facility is to dry, weld, and inspect the Multi-Canister Overpacks before transport to dry storage

  18. Text extraction method for historical Tibetan document images based on block projections

    Science.gov (United States)

    Duan, Li-juan; Zhang, Xi-qun; Ma, Long-long; Wu, Jian

    2017-11-01

    Text extraction is an important initial step in digitizing the historical documents. In this paper, we present a text extraction method for historical Tibetan document images based on block projections. The task of text extraction is considered as text area detection and location problem. The images are divided equally into blocks and the blocks are filtered by the information of the categories of connected components and corner point density. By analyzing the filtered blocks' projections, the approximate text areas can be located, and the text regions are extracted. Experiments on the dataset of historical Tibetan documents demonstrate the effectiveness of the proposed method.

  19. 200 Area Deactivation Project Facilities Authorization Envelope Document

    International Nuclear Information System (INIS)

    DODD, E.N.

    2000-01-01

    Project facilities as required by HNF-PRO-2701, Authorization Envelope and Authorization Agreement. The Authorization Agreements (AA's) do not identify the specific set of environmental safety and health requirements that are applicable to the facility. Therefore, the facility Authorization Envelopes are defined here to identify the applicable requirements. This document identifies the authorization envelopes for the 200 Area Deactivation

  20. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  1. Reducing failures rate within the project documentation using Building Information Modelling, especially Level of Development

    Directory of Open Access Journals (Sweden)

    Prušková Kristýna

    2018-01-01

    Full Text Available Paper´s focus is on differences between traditional modelling in 2D software and modelling within the BIM technology. Research uncovers failures connected to the traditional way of designing and construction of project documentation. There are revealed and shown mismatches within the project documentation. Solution within the Building information modelling Technology is outlined. As a reference, there is used experience with design of specific building in both ways of construction of project documentation: in the way of traditional modelling and in the way when using BIM technology, especially using Level of Development. Output of this paper is pointing to benefits of using advanced technology in building design, thus Building Information Modelling, especially Level of Development, which leads to reducing failures rate within the project documentation.

  2. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  3. PROJECT ENGINEERING DATA MANAGEMENT AT AUTOMATED PREPARATION OF DESIGN DOCUMENTATION

    Directory of Open Access Journals (Sweden)

    A. V. Guryanov

    2017-01-01

    Full Text Available We have developed and realized instrumental means for automated support of end-to-end design process for design documentation on a product at the programming level. The proposed decision is based on processing of the engineering project data that are contained in interdependent design documents: tactical technical characteristics of products, data on the valuable metals contained in them, the list of components applied in a product and others. Processing of engineering data is based on their conversion to the form provided by requirements of industry standards for design documentation preparation. The general graph of the design documentation developed on a product is provided. The description of the developed software product is given. Automated preparation process of interdependent design documents is shown on the example of preparation of purchased products list. Results of work can be used in case of research and development activities on creation of perspective samples of ADP equipment.

  4. Preliminary Design Requirements Document for Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-27

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1.

  5. Preliminary Design Requirements Document for Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1

  6. Design requirements document for project W-520, immobilized low-activity waste disposal

    International Nuclear Information System (INIS)

    Ashworth, S.C.

    1998-01-01

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity

  7. Design requirements document for project W-520, immobilized low-activity waste disposal

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, S.C.

    1998-08-06

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity.

  8. Video-documentation: 'The Pannonic ozon project'

    International Nuclear Information System (INIS)

    Loibl, W.; Cabela, E.; Mayer, H. F.; Schmidt, M.

    1998-07-01

    Goal of the project was the production of a video film as documentation of the Pannonian Ozone Project- POP. The main part of the video describes the POP-model consisting of the modules meteorology, emissions and chemistry, developed during the POP-project. The model considers the European emission patterns of ozone precursors and the actual wind fields. It calculates ozone build up and depletion within air parcels due to emission and weather situation along trajectory routes. Actual ozone concentrations are calculated during model runs simulating the photochemical processes within air parcels moving along 4 day trajectories before reaching the Vienna region. The model computations were validated during extensive ground and aircraft-based measurements of ozone precursors and ozone concentration within the POP study area. Scenario computations were used to determine how much ozone can be reduced in north-eastern Austria by emissions control measures. The video lasts 12:20 minutes and consists of computer animations and life video scenes, presenting the ozone problem in general, the POP model and the model results. The video was produced in co-operation by the Austrian Research Center Seibersdorf - Department of Environmental Planning (ARCS) and Joanneum Research - Institute of Informationsystems (JR). ARCS was responsible for idea, concept, storyboard and text while JR was responsible for computer animation and general video production. The speaker text was written with scientific advice by the POP - project partners: Institute of Meteorology and Physics, University of Agricultural Sciences- Vienna, Environment Agency Austria - Air Quality Department, Austrian Research Center Seibersdorf- Environmental Planning Department/System Research Division. The film was produced as German and English version. (author)

  9. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  10. UMTRA Surface Project management action process document. Final report: Revision 1

    International Nuclear Information System (INIS)

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC section 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project

  11. Use of communication technologies in document exchange for the management of construction projects

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2016-06-01

    Full Text Available Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.

  12. Use of communication technologies in document exchange for the management of construction projects

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2016-06-01

    Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.

  13. Preliminary design requirements document (DRD) for Project W-236B, ''Initial Pretreatment Module''

    International Nuclear Information System (INIS)

    Swanson, L.M.

    1995-01-01

    The scope of this Design Requirements Document (DRD) is to identify and define the functions, with associated requirements, which must be performed to separate Hanford Site tank waste supernatants into low-level and high-level fractions. This documents sets forth function requirements, performance requirements, and design constraints necessary to begin conceptual design for the Initial Pretreatment Module (IPM). System and physical interfaces between the IPM project and the Tank Waste Remediation System (TWRS) are identified. The constraints, performance requirements, and transfer of information and data across a technical interface will be documented in an Interface Control Document. Supplemental DRDs will be prepared to provide more detailed requirements specific to systems described in the DRD

  14. Synthesis of the IRSN report on its analysis of the safety guidance package (DOrS) of the ASTRID reactor project. Safety guidance document for the ASTRID prototype: Referral to the GPR. Opinion related to the safety guidance document of the ASTRID reactor project. ASTRID prototype: Safety guidance document for the ASTRID prototype

    International Nuclear Information System (INIS)

    Lachaume, Jean-Luc; Niel, Jean-Christophe

    2013-01-01

    A first document indicates the improvement guidelines for the ASTRID project based on the French experience in the field of sodium-cooled fast neutron reactors, addresses the safety objectives as they are presented for the ASTRID project, discusses how the project includes a regulation and design referential, and how it addresses various aspects of the design approach (ranking and analysis of operation situations, defence in depth, use of probabilistic studies, safety classification and qualification to accidental situations, taking internal and external aggressions into account and taking severe accidents into account at the design level). It comments the guidelines related to the first two barriers, to main safety functions (control of reactivity and of reactor cooling, containment of radioactive and toxic materials), to dismantling, to R and D for safety support. A second document is a letter sent by the ASN to the GPR (permanent group of experts in charge of nuclear reactors) about the safety guidance document for the ASTRID prototype. The third document is the answer and contains comments and recommendations by this group about the content of this document, and therefore addresses the same topics as the first document. The last document defines the framework of the approach to this document

  15. Terrestrial laser scanning for heritage conservation: the Cologne Cathedral documentation project

    Science.gov (United States)

    Pritchard, D.; Sperner, J.; Hoepner, S.; Tenschert, R.

    2017-08-01

    Contemporary terrestrial laser scanners and photogrammetric imaging systems are an invaluable tool in providing objectively precise, as-built records of existing architectural, engineering and industrial sites. The comprehensive three-dimensional (3D) recording of culturally important sites such as heritage buildings, monuments, and sites can serve a variety of invaluable purposes; the data can assist in the conservation, management, and repair of a structure, as well as provide a visually engaging educational resource for both the public and scholars. The acquired data acts as a form of digital preservation, a timeless virtual representation of the as-built structure. The technical capability of these systems is particularly suited for the documentation of a richly articulated and detailed building such as the high Gothic Cologne Cathedral. The 3D documentation of the Cologne Cathedral UNESCO World Heritage Site is a multiphase project developed by Heriot-Watt University, Edinburgh in partnership with the Fresenius University of Applied Sciences, Cologne, and the Metropolitankapitel der Hohen Domkirche Köln Dombauhütte. The project has also received generous support from Zoller + Fröhlich (Z+F) and the City of Cologne.

  16. PROJECT ANQA: DIGITIZING AND DOCUMENTING CULTURAL HERITAGE IN THE MIDDLE EAST

    Directory of Open Access Journals (Sweden)

    S. Akhtar

    2017-08-01

    Full Text Available The practice of digitizing cultural heritage sites is gaining ground among conservation scientists and scholars in architecture, art history, computer science, and related fields. Recently, the location of such sites in areas of intense conflict has highlighted the urgent need for documenting cultural heritage for the purposes of preservation and posterity. The complex histories of such sites requires more than just their digitization, and should also include the meaningful interpretation of buildings and their surroundings with respect to context and intangible values. Project Anqa is an interdisciplinary and multi-partner effort that goes beyond simple digitization to record at-risk heritage sites throughout the Middle East and Saharan Africa, most notably in Syria and Iraq, before they are altered or destroyed. Through a collaborative process, Anqa assembles documentation, historically contextualizes it, and makes data accessible and useful for scholars, peers, and the wider public through state-of-the-art tools. The aim of the project is to engage in capacity-building on the ground in Syria and Iraq, as well as to create an educational web platform that informs viewers about cultural heritage in the region through research, digital storytelling, and the experience of virtual environments.

  17. Project Anqa: Digitizing and Documenting Cultural Heritage in the Middle East

    Science.gov (United States)

    Akhtar, S.; Akoglu, G.; Simon, S.; Rushmeier, H.

    2017-08-01

    The practice of digitizing cultural heritage sites is gaining ground among conservation scientists and scholars in architecture, art history, computer science, and related fields. Recently, the location of such sites in areas of intense conflict has highlighted the urgent need for documenting cultural heritage for the purposes of preservation and posterity. The complex histories of such sites requires more than just their digitization, and should also include the meaningful interpretation of buildings and their surroundings with respect to context and intangible values. Project Anqa is an interdisciplinary and multi-partner effort that goes beyond simple digitization to record at-risk heritage sites throughout the Middle East and Saharan Africa, most notably in Syria and Iraq, before they are altered or destroyed. Through a collaborative process, Anqa assembles documentation, historically contextualizes it, and makes data accessible and useful for scholars, peers, and the wider public through state-of-the-art tools. The aim of the project is to engage in capacity-building on the ground in Syria and Iraq, as well as to create an educational web platform that informs viewers about cultural heritage in the region through research, digital storytelling, and the experience of virtual environments.

  18. Bibliography of documents and related materials collected for the Hawaii Geothermal Project Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Glenn, F.M.; Boston, C.R.; Burns, J.C.; Hagan, C.W. Jr.; Saulsbury, J.W.; Wolfe, A.K.

    1995-03-01

    This report has been prepared to make available and archive information developed during preparation of the Environmental Impact Statement for Phases 3 and 4 of the Hawaii Geothermal Project as defined by the state of Hawaii in its April 1989 proposal to Congress. On May 17, 1994, the USDOE published a notice in the Federal Register withdrawing its Notice of Intent of February 14, 1992, to prepare the HGP EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. This report provides a bibliography of documents, published papers, and other reference materials that were obtained or used. The report provides citations for approximately 642 documents, published papers, and other reference materials that were gathered to describe the potentially affected environment on the islands of Hawaii, Maui, and Oahu. The listing also does not include all the reference materials developed by support subcontractors and cooperating agencies who participated in the project. This listing does not include correspondence or other types of personal communications. The documents listed in this report can be obtained from original sources or libraries.

  19. 13. Project Management Documentation and Communications

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2014-01-01

    This chapter discusses the relationship between documentation and communication practices in organizational contexts.......This chapter discusses the relationship between documentation and communication practices in organizational contexts....

  20. Databases in the documentation management for big industrial projects; Les bases de donnees dans la gestion documentaire des grands projets industriels

    Energy Technology Data Exchange (ETDEWEB)

    Cauchet, A; Chevillard, F; Parisot, Y; Tirefort, C [Societe EURODOC, Saint Quentin en Yvenlines (France)

    1990-05-01

    The documentation management of a big industrial project involves a continuous update of information, both in the study and realization phase or in the operation phase. The organization of the technical documentation for big industrial projects requests complex information systems. In the first part of this paper are presented the methods appropriate for the analysis of documentation management procedures and in the second part are presented the tools by the combination of which a documentation system for the user is provided. The case of the documentation centres for the Hague reprocessing plant is described.

  1. Supplemental design requirements document enhanced radioactive and mixed waste storage Phase V Project W-112

    International Nuclear Information System (INIS)

    Ocampo, V.P.; Boothe, G.F.; Greager, T.M.; Johnson, K.D.; Kooiker, S.L.; Martin, J.D.

    1994-11-01

    This document provides additional and supplemental information to WHC-SD-W112-FDC-001, Project W-112 for radioactive and mixed waste storage. It provides additional requirements for the design and summarizes Westinghouse Hanford Company key design guidance and establishes the technical baseline agreements to be used for definitive design of the Project W-112 facilities

  2. Documenting genomics: Applying archival theory to preserving the records of the Human Genome Project.

    Science.gov (United States)

    Shaw, Jennifer

    2016-02-01

    The Human Genome Archive Project (HGAP) aimed to preserve the documentary heritage of the UK's contribution to the Human Genome Project (HGP) by using archival theory to develop a suitable methodology for capturing the results of modern, collaborative science. After assessing past projects and different archival theories, the HGAP used an approach based on the theory of documentation strategy to try to capture the records of a scientific project that had an influence beyond the purely scientific sphere. The HGAP was an archival survey that ran for two years. It led to ninety scientists being contacted and has, so far, led to six collections being deposited in the Wellcome Library, with additional collections being deposited in other UK repositories. In applying documentation strategy the HGAP was attempting to move away from traditional archival approaches to science, which have generally focused on retired Nobel Prize winners. It has been partially successful in this aim, having managed to secure collections from people who are not 'big names', but who made an important contribution to the HGP. However, the attempt to redress the gender imbalance in scientific collections and to improve record-keeping in scientific organisations has continued to be difficult to achieve. Copyright © 2015 The Author. Published by Elsevier Ltd.. All rights reserved.

  3. Data management for the Clinch River Breeder Reactor Plant Project by use of document status and hold systems

    International Nuclear Information System (INIS)

    Hunt, C.S.; Beck, A.E.; Akhtar, M.S.

    1982-01-01

    This paper describes the development, framework, and scope of the Document Status System and the Document Hold System for the Clinch River Breeder Reactor Plant Project. It shows how data are generated at five locations and transmitted to a central computer for processing and storage. The resulting computerized data bank provides reports needed to perform day-to-day management and engineering planning. Those reports also partially satisfy the requirements of the Project's Quality Assurance Program

  4. UMTRA Surface Project management action process document: Final. Revision 2

    International Nuclear Information System (INIS)

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites

  5. UMTRA Surface Project management action process document: Final. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  6. Global Change Data Base Pilot (Diskette) Project for Africa. Dase base documentation version 1.1

    Science.gov (United States)

    1992-06-01

    The data base for Africa contains vegetation data, climate data, and other thematic data for a recent three and a half year period. The documentation contains separate chapters of material edited about separate data sets of the overall Global Change Data Base, Pilot (diskette) Project for Africa. Descriptions of data formats, authors, and contributors are accompanied by documentation of the development/use of the data. These materials have been suggested and contributed directly by the authors of the individual data sets. To avoid confusion, some information contained in the documentation that is not directly relevant to the data base has been either omitted, crossed out, or blanked out.

  7. Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description

    International Nuclear Information System (INIS)

    Womack, J.C.; Cramond, R.; Paedon, R.J.

    1995-01-01

    This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also

  8. IDC System Specification Document.

    Energy Technology Data Exchange (ETDEWEB)

    Clifford, David J.

    2014-12-01

    This document contains the system specifications derived to satisfy the system requirements found in the IDC System Requirements Document for the IDC Reengineering Phase 2 project. Revisions Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Reengineering Project Team Initial delivery M. Harris

  9. The database system for the management of technical documentations of PWR fuel design project using CD-ROM

    International Nuclear Information System (INIS)

    Park, Bong Sik; Lee, Won Jae; Ryu, Jae Kwon; Jo, In Hang; Chang, Jong Hwa.

    1996-12-01

    In this report, the database system developed for the management of technical documentation of PWR fuel design project using CD-ROM (compact disk - read only memory) is described. The database system, KIRDOCM (KAERI Initial and Reload Fuel project technical documentation management), is developed and installed on PC using Visual Foxpro 3.0. Descriptions are focused on the user interface of the KIRDOCM. Introduction addresses the background and concept of the development. The main chapter describes the user requirements, the analysis of computing environment, the design of KIRDOCM, the implementation of the KIRDOCM, user's manual of KIRDOCM and the maintenance of the KIRDOCM for future improvement. The implementation of KIRDOCM system provides the efficiency in the management, maintenance and indexing of the technical documents. And, it is expected that KIRDOCM may be a good reference in applying Visual Foxpro for the development of information management system. (author). 2 tabs., 13 figs., 8 refs

  10. Two-stage Framework for a Topology-Based Projection and Visualization of Classified Document Collections

    Energy Technology Data Exchange (ETDEWEB)

    Oesterling, Patrick; Scheuermann, Gerik; Teresniak, Sven; Heyer, Gerhard; Koch, Steffen; Ertl, Thomas; Weber, Gunther H.

    2010-07-19

    During the last decades, electronic textual information has become the world's largest and most important information source available. People have added a variety of daily newspapers, books, scientific and governmental publications, blogs and private messages to this wellspring of endless information and knowledge. Since neither the existing nor the new information can be read in its entirety, computers are used to extract and visualize meaningful or interesting topics and documents from this huge information clutter. In this paper, we extend, improve and combine existing individual approaches into an overall framework that supports topological analysis of high dimensional document point clouds given by the well-known tf-idf document-term weighting method. We show that traditional distance-based approaches fail in very high dimensional spaces, and we describe an improved two-stage method for topology-based projections from the original high dimensional information space to both two dimensional (2-D) and three dimensional (3-D) visualizations. To show the accuracy and usability of this framework, we compare it to methods introduced recently and apply it to complex document and patent collections.

  11. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  12. Interface control document for tank waste remediation system privatization phase 1 infrastructure support Project W-519

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This document describes the functional and physical interfaces between the Tank Waste Remediation System (TWRS) Privatization Phase 1 Infrastructure Project W-519 and the various other projects (i.e., Projects W-314, W-464, W-465, and W-520) supporting Phase 1 that will require the allocation of land in and about the Privatization Phase 1 Site and/or interface with the utilities extended by Project W-519. Project W-519 will identify land use allocations and upgrade/extend several utilities in the 200-East Area into the Privatization Phase 1 Site (formerly the Grout Disposal Compound) in preparation for the Privatization Contractors (PC) to construct treatment facilities. The project will upgrade/extend: Roads, Electrical Power, Raw Water (for process and fire suppression), Potable Water, and Liquid Effluent collection. The replacement of an existing Sanitary Sewage treatment system that may be displaced by Phase 1 site preparation activities may also be included

  13. Documenter le futur: fantasmes, projections et decalages spatiotemporels

    Directory of Open Access Journals (Sweden)

    Alice Forge

    2015-10-01

    Full Text Available Le concept de documentation future recèle un paradoxe : le mot documenter renvoie à des traces relevées dans un passé factuel, tandis que le futur ne peut, par définition, être qu’incertain, que l’objet de fantasmes, de projections. L’analyse suivante questionne ce paradoxe à travers l’analyse d’un motif cinématographique : un homme et une femme face à une tranche de séquoia, représentation symbolique du temps. Ce motif apparait dans trois oeuvres majeures du cinéma : Vertigo, d’Alfred Hitchcock, La Jetée de Chris Marker, et l’Armée des douze singes, de Terry Gilliam. La répétition de ce motif est mise en rapport avec l’ouvrage de Pierre Bayard, Le plagiat par anticipation, afin de l’envisager sous l’angle du paradoxe temporel, plutôt que sous le régime de la chronologie historique. Cette analyse prend pour point de départ une oeuvre intitulée Vozes Fantasmas, qui sur le principe de la documentation future propose d’écouter des murmures de spectateurs visitant une exposition qui n’a pas eu lieu. RESUMO O conceito de documentação do futuro evoca um paradoxo: o verbo documentar refere-se a traços ou rastros preservados de um passado factual, enquanto o futuro por definição é algo incerto, objeto de especulações, fantasias e projeções. Nossa reflexão questiona este paradoxo a partir da análise de uma cena cinematográfica: um homem e uma mulher em frente de um corte de sequoia, que é a representação simbólica do tempo. Esta cena aprece em três grandes obras do cinema: Vertigo (Um corpo que cai de Alfred Hitchcock, La Jetée de Chris Marker, e Os Doze Macacos de Terry Gilliam. A repetição desta cena é abordada em relação à obra de Pierre Bayard, Plágio por antecipação, a fim de considerá-la em termos de paradoxo temporal, e não como uma cronologia histórica. Esta análise tem como ponto de partida um trabalho artístico intitulado Vozes Fantasmas, que seguindo o princípio de

  14. HAZWOPER project documents for demolition of the Waste Evaporator Facility, Building 3506, at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-03-01

    This document, in support of the Waste Evaporator Facility (WEF) demolition project and contains the Project Work Plan and the Project Health and Safety Plan for demolition and partial remediation actions by ATG at the Waste Evaporator Facility, Building 3506. Various activities will be conducted during the course of demolition, and this plan provides details on the work steps involved, the identification of hazards, and the health and safety practices necessary to mitigate these hazards. The objective of this document is to develop an approach for implementing demolition activities at the WEF. This approach is based on prior site characterization information and takes into account all of the known hazards at this facility. The Project Work Plan provides instructions and requirements for identified work steps that will be utilized during the performance of demolition, while the Health and Safety Plan addresses the radiological, hazardous material exposure, and industrial safety concerns that will be encountered

  15. HAZWOPER project documents for demolition of the Waste Evaporator Facility, Building 3506, at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This document, in support of the Waste Evaporator Facility (WEF) demolition project and contains the Project Work Plan and the Project Health and Safety Plan for demolition and partial remediation actions by ATG at the Waste Evaporator Facility, Building 3506. Various activities will be conducted during the course of demolition, and this plan provides details on the work steps involved, the identification of hazards, and the health and safety practices necessary to mitigate these hazards. The objective of this document is to develop an approach for implementing demolition activities at the WEF. This approach is based on prior site characterization information and takes into account all of the known hazards at this facility. The Project Work Plan provides instructions and requirements for identified work steps that will be utilized during the performance of demolition, while the Health and Safety Plan addresses the radiological, hazardous material exposure, and industrial safety concerns that will be encountered.

  16. Hanford spent nuclear fuel project recommended path forward, volume III: Alternatives and path forward evaluation supporting documentation

    International Nuclear Information System (INIS)

    Fulton, J.C.

    1994-10-01

    Volume I of the Hanford Spent Nuclear Fuel Project - Recommended Path Forward constitutes an aggressive series of projects to construct and operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. Volume II provided a comparative evaluation of four Alternatives for the Path Forward and an evaluation for the Recommended Path Forward. Although Volume II contained extensive appendices, six supporting documents have been compiled in Volume III to provide additional background for Volume II

  17. A Cognitive Model of Document Use during a Research Project. Study I. Document Selection.

    Science.gov (United States)

    Wang, Peiling; Soergel, Dagobert

    1998-01-01

    Proposes a model of document selection by real users of a bibliographic retrieval system. Reports on Part I of a longitudinal study of decision making on document use by academics (25 faculty and graduate students in Agricultural Economics). Examines what components are relevant to the users' decisions and what cognitive process may have occurred…

  18. Metric Documentation of Cultural Heritage: Research Directions from the Italian Gamher Project

    Science.gov (United States)

    Bitelli, G.; Balletti, C.; Brumana, R.; Barazzetti, L.; D'Urso, M. G.; Rinaudo, F.; Tucci, G.

    2017-08-01

    GAMHer is a collaborative project that aims at exploiting and validating Geomatics algorithms, methodologies and procedures in the framework of new European regulations, which require a more extensive and productive use of digital information, as requested by the Digital Agenda for Europe as one of the seven pillars of the Europe 2020 Strategy. To this aim, GAMHer focuses on the need of a certified accuracy for surveying and monitoring projects with photogrammetry and laser scanning technologies, especially when used in a multiscale approach for landscape and built heritage documentation, conservation, and management. The approach used follows a multi-LoD (level of detail) transition that exploits GIS systems at the landscape scale, BIM technology and "point cloud based" 3d modelling for the scale of the building, and an innovative BIM/GIS integrated approach to foster innovation, promote users' collaboration and encourage communication between users. The outcomes of GAMHer are not intended to be used only by a community of Geomatics specialists, but also by a heterogeneous user community that exploit images and laser scans in their professional activities.

  19. METRIC DOCUMENTATION OF CULTURAL HERITAGE: RESEARCH DIRECTIONS FROM THE ITALIAN GAMHER PROJECT

    Directory of Open Access Journals (Sweden)

    G. Bitelli

    2017-08-01

    Full Text Available GAMHer is a collaborative project that aims at exploiting and validating Geomatics algorithms, methodologies and procedures in the framework of new European regulations, which require a more extensive and productive use of digital information, as requested by the Digital Agenda for Europe as one of the seven pillars of the Europe 2020 Strategy. To this aim, GAMHer focuses on the need of a certified accuracy for surveying and monitoring projects with photogrammetry and laser scanning technologies, especially when used in a multiscale approach for landscape and built heritage documentation, conservation, and management. The approach used follows a multi-LoD (level of detail transition that exploits GIS systems at the landscape scale, BIM technology and “point cloud based” 3d modelling for the scale of the building, and an innovative BIM/GIS integrated approach to foster innovation, promote users’ collaboration and encourage communication between users. The outcomes of GAMHer are not intended to be used only by a community of Geomatics specialists, but also by a heterogeneous user community that exploit images and laser scans in their professional activities.

  20. Supplemental design requirements document, Project W026

    International Nuclear Information System (INIS)

    Weidert, J.R.

    1993-01-01

    This document supplements and extends the Functional Design Criteria, SP-W026-FDC-001, for the Waste Receiving and Processing Facility (WRAP), Module 1. It provides additional detailed requirements, summarizes key Westinghouse Hanford Company design guidance, and establishes baseline technical agreements to be used in definitive design of the WRAP-1 facility. Revision 3 of the Supplemental Design Requirements Document has been assigned an Impact Level of 3ESQ based on the content of the entire revision. The actual changes made from Revision 2 have an Impact Level of 3S and the basis for these changes was previously reviewed and approved per WHC correspondence No. 9355770

  1. Documenting success of energy management cost reduction initiatives

    International Nuclear Information System (INIS)

    Stewart, A.

    1993-01-01

    The scope of this paper is to offer methods to document energy saving projects. The examples used are based on actual industrial facilities. I will define concepts to be used in the analysis of the industrial work place energy consumption. With the concepts defined we can begin to apply the documentation strategy for some specific examples. Why should we be interested in auditing the results of energy projects? Nearly every industrial facility has embarked on the road to energy efficiency. As one of my plant engineer associates relates open-quotes If all our energy saving programs were working as stated the power company would be paying us.close quotes The underlying principles in this statement are true. Does it mean we as technicians, engineers and managers of energy projects have failed? No, we have however failed to finish the job and document there results. My experience has shown there is good support and enthusiasm for those energy projects we begin. It is also my experience that a well documented successful project provides many levels of satisfaction. Large energy management projects involve a major financial commitment. Documenting the results provides all those who supported the project from finance, management and the technical staff the positive reinforcement to support your future projects. We should begin by defining what an energy audit is and what is the expected result of an audit

  2. Criteria Document for B-plant's Surveillance and Maintenance Phase Safety Basis Document

    International Nuclear Information System (INIS)

    SCHWEHR, B.A.

    1999-01-01

    This document is required by the Project Hanford Managing Contractor (PHMC) procedure, HNF-PRO-705, Safety Basis Planning, Documentation, Review, and Approval. This document specifies the criteria that shall be in the B Plant surveillance and maintenance phase safety basis in order to obtain approval of the DOE-RL. This CD describes the criteria to be addressed in the S and M Phase safety basis for the deactivated Waste Fractionization Facility (B Plant) on the Hanford Site in Washington state. This criteria document describes: the document type and format that will be used for the S and M Phase safety basis, the requirements documents that will be invoked for the document development, the deactivated condition of the B Plant facility, and the scope of issues to be addressed in the S and M Phase safety basis document

  3. IDC System Specification Document Version 1.1.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lober, Randall R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-02-01

    This document contains the system specifications derived to satisfy the system requirements found in the IDC System Requirements Document for the IDC Reengineering Phase 2 project. Revisions Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Reengineering Project Team Initial delivery M. Harris V1.1 2/2015 IDC Reengineering Project Team Iteration I2 Review Comments M. Harris

  4. NASA software documentation standard software engineering program

    Science.gov (United States)

    1991-01-01

    The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.

  5. Guidance document for preparing water sampling and analysis plans for UMTRA Project sites. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    A water sampling and analysis plan (WSAP) is prepared for each Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide the rationale for routine ground water sampling at disposal sites and former processing sites. The WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine ground water monitoring stations at each site. This guidance document has been prepared by the Technical Assistance Contractor (TAC) for the US Department of Energy (DOE). Its purpose is to provide a consistent technical approach for sampling and monitoring activities performed under the WSAP and to provide a consistent format for the WSAP documents. It is designed for use by the TAC in preparing WSAPs and by the DOE, US Nuclear Regulatory Commission, state and tribal agencies, other regulatory agencies, and the public in evaluating the content of WSAPS

  6. The use of CD-ROMs for storage and document delivery at the British Library Document Supply Centre

    International Nuclear Information System (INIS)

    Bradbury, D.

    1990-05-01

    The British Library Document Supply Centre (BLDSC) has been in the forefront of international document delivery for 20 years. During the last 5 years it has been very actively involved in the ADONIS Project, through which the full text of some 200 journals in the life sciences have been stored, accessed, and delivered through the medium of CD-ROM. The BLDSC's involvement in this project is described and indications of the lessons learned and of the implications for international document delivery systems in the future are given. (author)

  7. The use of CD-ROMs for storage and document delivery at the British Library Document Supply Centre

    Energy Technology Data Exchange (ETDEWEB)

    Bradbury, D [British Library Document Supply Centre, Boston SPA (United Kingdom)

    1990-05-01

    The British Library Document Supply Centre (BLDSC) has been in the forefront of international document delivery for 20 years. During the last 5 years it has been very actively involved in the ADONIS Project, through which the full text of some 200 journals in the life sciences have been stored, accessed, and delivered through the medium of CD-ROM. The BLDSC`s involvement in this project is described and indications of the lessons learned and of the implications for international document delivery systems in the future are given. (author).

  8. Content Documents Management

    Science.gov (United States)

    Muniz, R.; Hochstadt, J.; Boelke J.; Dalton, A.

    2011-01-01

    The Content Documents are created and managed under the System Software group with. Launch Control System (LCS) project. The System Software product group is lead by NASA Engineering Control and Data Systems branch (NEC3) at Kennedy Space Center. The team is working on creating Operating System Images (OSI) for different platforms (i.e. AIX, Linux, Solaris and Windows). Before the OSI can be created, the team must create a Content Document which provides the information of a workstation or server, with the list of all the software that is to be installed on it and also the set where the hardware belongs. This can be for example in the LDS, the ADS or the FR-l. The objective of this project is to create a User Interface Web application that can manage the information of the Content Documents, with all the correct validations and filters for administrator purposes. For this project we used one of the most excellent tools in agile development applications called Ruby on Rails. This tool helps pragmatic programmers develop Web applications with Rails framework and Ruby programming language. It is very amazing to see how a student can learn about OOP features with the Ruby language, manage the user interface with HTML and CSS, create associations and queries with gems, manage databases and run a server with MYSQL, run shell commands with command prompt and create Web frameworks with Rails. All of this in a real world project and in just fifteen weeks!

  9. Hanford Tanks Initiative requirements and document management process guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This revision of the guide provides updated references to project management level Program Management and Assessment Configuration Management activities, and provides working level directions for submitting requirements and project documentation related to the Hanford Tanks Initiative (HTI) project. This includes documents and information created by HTI, as well as non-HTI generated materials submitted to the project

  10. Evaluation of aspect-oriented frameworks in Python for extending a project with provenance documentation features

    Directory of Open Access Journals (Sweden)

    2011-08-01

    Full Text Available In this paper we describe two sides of a real life use case of introducing an aspect-oriented framework into an industrial-grade project. This paper is divided into two parts: the selection process for an AOP framework in the Python programming language, and its use for modularized non-invasive recording of provenance data in a distributed data management tool. Criteria for the choice of such a framework are discussed and the background of provenance documentation is laid out.

  11. Supplmental design requirements document enhanced radioactive and mixed waste storage: Phase 5, Project W-113

    International Nuclear Information System (INIS)

    Ocampo, V.P.

    1994-11-01

    This Supplemental Design Requirements Document (SDRD) is used to communicate Project W-113 specific plant design information from Westinghouse Hanford Company (WHC) to the United States Department of Energy (DOE) and the cognizant Architect Engineer (A/E). The SDRD is prepared after the completion of the project Conceptual Design report (CDR) and prior to the initiation of definitive design. Information in the SDRD serves two purposes: to convey design requirements that are too detailed for inclusion in the Functional Design Criteria (FDC) report and to serve as a means of change control for design commitments in the Title I and Title II design. The Solid Waste Retrieval Project (W-113) SDRD has been restructured from the equipment based outline used in previous SDRDs to a functional systems outline. This was done to facilitate identification of deficiencies in the information provided in the initial draft SDRD and aid design confirmation. The format and content of this SDRD adhere as closely as practicable to the requirements of WHC-CM-6-1, Standard Engineering Practices for Functional Design Criteria

  12. Sandia Software Guidelines, Volume 2. Documentation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This volume is one in a series of Sandia Software Guidelines intended for use in producing quality software within Sandia National Laboratories. In consonance with the IEEE Standards for software documentation, this volume provides guidance in the selection of an adequate document set for a software project and example formats for many types of software documentation. A tutorial on life cycle documentation is also provided. Extended document thematic outlines and working examples of software documents are available on electronic media as an extension of this volume.

  13. Pilot production system cost/benefit analysis: Digital document storage project

    Science.gov (United States)

    1989-01-01

    The Digital Document Storage (DDS)/Pilot Production System (PPS) will provide cost effective electronic document storage, retrieval, hard copy reproduction, and remote access for users of NASA Technical Reports. The DDS/PPS will result in major benefits, such as improved document reproduction quality within a shorter time frame than is currently possible. In addition, the DDS/PPS will provide an important strategic value through the construction of a digital document archive. It is highly recommended that NASA proceed with the DDS Prototype System and a rapid prototyping development methodology in order to validate recent working assumptions upon which the success of the DDS/PPS is dependent.

  14. Designing Documents for People to Use

    Directory of Open Access Journals (Sweden)

    David Sless

    Full Text Available This article reports on the work of Communication Research Institute (CRI, an international research center specializing in communication and information design. With the support of government, regulators, industry bodies, and business—and with the participation of people and their advocates—CRI has worked on over 200 public document design projects since it began as a small unit in 1985. CRI investigates practical methods and achievable standards for designing digital and paper public documents, including forms; workplace procedural notices; bills, letters, and emails sent by organizations; labels and instructions that accompany products and services; and legal and financial documents and contracts. CRI has written model grammars for the document types it designs, and the cumulative data from CRI projects has led to a set of systematic methods for designing public-use documents to a high standard. Through research, design, publishing, and advocacy, CRI works to measurably improve the ordinary documents we all have to use. Keywords: Information design, Design methods, Design standards, Communication design, Design diagnostic testing, Design research

  15. Nuclear power plants documentation system

    International Nuclear Information System (INIS)

    Schwartz, E.L.

    1991-01-01

    Since the amount of documents (type and quantity) necessary for the entire design of a NPP is very large, this implies that an overall and detailed identification, filling and retrieval system shall be implemented. This is even more applicable to the FINAL QUALITY DOCUMENTATION of the plant, as stipulated by IAEA Safety Codes and related guides. For such a purpose it was developed a DOCUMENTATION MANUAL, which describes in detail the before mentioned documentation system. Here we present the expected goals and results which we have to reach for Angra 2 and 3 Project. (author)

  16. Environmental restoration value engineering guidance document

    International Nuclear Information System (INIS)

    1995-07-01

    This document provides guidance on Value Engineering (VE). VE is an organized team effort led by a person trained in the methodology to analyze the functions of projects, systems, equipment, facilities, services, and processes for achieving the essential functions at the lowest life cycle cost while maintaining required performance, reliability, availability, quality, and safety. VE has proven to be a superior tool to improve up-front project planning, cut costs, and create a better value for each dollar spent. This document forms the basis for the Environmental Restoration VE Program, describes the VE process, and provides recommendations on when it can be most useful on ER projects

  17. IRPhE-DRAGON-DPR, OECD High Temperature Reactor Dragon Project, Primary Documents

    International Nuclear Information System (INIS)

    2004-01-01

    Description: The DRAGON Reactor Experiment (DRE): The first demonstration High temperature gas reactor (HTGR) was built in the 1960's. Thirteen OECD countries began a project in 1959 to build an experimental reactor known as Dragon at Winfrith in the UK. The reactor - which operated successfully between 1966 and 1975 - had a thermal output of 20 MW and achieved a gas outlet temperature of 750 deg. C. The High Temperature Reactor concept, if it justified its expectations, was seen as having its place as an advanced thermal reactor between the current thermal reactor types such as the PWR, BWR, and AGR and the sodium cooled fast breeder reactor. It was expected that the HTR would offer better thermal efficiency, better uranium utilisation, either with low enriched uranium fuel or high enriched uranium thorium fuel, better inherent safety and lower unit power costs. In the event all these potential advantages were demonstrated to be in principle achievable. This view is still shared today. In fact Very High Temperature Reactors is one of the concepts retained for Generation IV. Projects on constructing Modular Pebble Bed Reactors are under way. Here all available Dragon Project Reports (DPR) - approximately 1000 - are collected in electronic form. An index points to the reports (PDF format); each table in the report is accessible in EXCEL format with the aim of facilitating access to the data. These reports describe the design, experiments and modelling carried out over a period of 17 years. 2 - Related or auxiliary information: IRPHE-HTR-ARCH-01, Archive of HTR Primary Documents NEA-1728/01. 3 - Software requirements: Acrobat Reader, Microsoft Word, HTML Browser required

  18. Integrating model of the Project Independence Evaluation System. Volume VI. Data documentation. Part I

    Energy Technology Data Exchange (ETDEWEB)

    Allen, B J

    1979-02-01

    This documentation describes the PIES Integrating Model as it existed on January 1, 1978. This volume contains two chapters. In Chapter I, Overview, the following subjects are briefly described: supply data, EIA projection series and scenarios, demand data and assumptions, and supply assumptions - oil and gas availabilities. Chapter II contains supply and demand data tables and sources used by the PIES Integrating Model for the mid-range scenario target years 1985 and 1990. Tabulated information is presented for demand, price, and elasticity data; coal data; imports data; oil and gas data; refineries data; synthetics, shale, and solar/geothermal data; transportation data; and utilities data.

  19. Document Management Projects: implementation guide

    OpenAIRE

    Beatriz Bagoin Guimarães

    2016-01-01

    Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations...

  20. ELECTRICAL POWER SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    M. Maniyar

    2004-06-22

    The purpose of this revision of the System Description Document (SDD) is to establish requirements that drive the design of the electrical power system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience are design engineers. This type of SDD leads and follows the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential to performing the design process. This SDD follows the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to this system are obtained from ''Project Functional and Operational Requirements'' (F&OR) (Siddoway, 2003). Other requirements to support the design process have been taken from higher level requirements documents such as ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), the fire hazards analyses, and the preclosure safety analysis. The above mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canori and Leitner 2003) requirements. This SDD includes several appendices with supporting information. Appendix B lists key system charts, diagrams, drawings, and lists; and Appendix C is a list of system procedures.

  1. Extremely secure identification documents

    International Nuclear Information System (INIS)

    Tolk, K.M.; Bell, M.

    1997-09-01

    The technology developed in this project uses biometric information printed on the document and public key cryptography to ensure that an adversary cannot issue identification documents to unauthorized individuals or alter existing documents to allow their use by unauthorized individuals. This process can be used to produce many types of identification documents with much higher security than any currently in use. The system is demonstrated using a security badge as an example. This project focused on the technologies requiring development in order to make the approach viable with existing badge printing and laminating technologies. By far the most difficult was the image processing required to verify that the picture on the badge had not been altered. Another area that required considerable work was the high density printed data storage required to get sufficient data on the badge for verification of the picture. The image processing process was successfully tested, and recommendations are included to refine the badge system to ensure high reliability. A two dimensional data array suitable for printing the required data on the badge was proposed, but testing of the readability of the array had to be abandoned due to reallocation of the budgeted funds by the LDRD office

  2. Consolidated Cab Display (CCD) System, Project Planning Document (PPD),

    Science.gov (United States)

    1981-02-01

    1980 1981 I 2 3 4 5 6 7 8 9 10 1112 1 2 3 4 5 6 7 8 9 1011112 1 2 31 12. Software Documentation a. Overall Computer Program Description ( OCPD ) b...Approve OCPD c. Computer Program Functional Specifications (CPFS) d. Data Base Table Design Specification (DBTDS) e. Software Interface Control Document...Parts List Master Pattern and Plan View Reproducible Drawings Instruction Book Training Aids/Materials b. Software: OCPD CPFS SI CD PDS DBTDS SDD

  3. Improving collaborative documentation in CMS

    International Nuclear Information System (INIS)

    Lassila-Perini, Kati; Salmi, Leena

    2010-01-01

    Complete and up-to-date documentation is essential for efficient data analysis in a large and complex collaboration like CMS. Good documentation reduces the time spent in problem solving for users and software developers. The scientists in our research environment do not necessarily have the interests or skills of professional technical writers. This results in inconsistencies in the documentation. To improve the quality, we have started a multidisciplinary project involving CMS user support and expertise in technical communication from the University of Turku, Finland. In this paper, we present possible approaches to study the usability of the documentation, for instance, usability tests conducted recently for the CMS software and computing user documentation.

  4. Course documentation report

    DEFF Research Database (Denmark)

    Buus, Lillian; Bygholm, Ann; Walther, Tina Dyngby Lyng

    A documentation report on the three pedagogical courses developed during the MVU project period. The report describes the three processes taking departure in the structure and material avaiable at the virtual learning environment. Also the report describes the way the two of the courses developed...

  5. The Human Genome Diversity (HGD) Project. Summary document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    In 1991 a group of human geneticists and molecular biologists proposed to the scientific community that a world wide survey be undertaken of variation in the human genome. To aid their considerations, the committee therefore decided to hold a small series of international workshops to explore the major scientific issues involved. The intention was to define a framework for the project which could provide a basis for much wider and more detailed discussion and planning--it was recognized that the successful implementation of the proposed project, which has come to be known as the Human Genome Diversity (HGD) Project, would not only involve scientists but also various national and international non-scientific groups all of which should contribute to the project`s development. The international HGD workshop held in Sardinia in September 1993 was the last in the initial series of planning workshops. As such it not only explored new ground but also pulled together into a more coherent form much of the formal and informal discussion that had taken place in the preceding two years. This report presents the deliberations of the Sardinia workshop within a consideration of the overall development of the HGD Project to date.

  6. Endangered Language Documentation and Transmission

    Directory of Open Access Journals (Sweden)

    D. Victoria Rau

    2007-01-01

    Full Text Available This paper describes an on-going project on digital archiving Yami language documentation (http://www.hrelp.org/grants/projects/index.php?projid=60. We present a cross-disciplinary approach, involving computer science and applied linguistics, to document the Yami language and prepare teaching materials. Our discussion begins with an introduction to an integrated framework for archiving, processing and developing learning materials for Yami (Yang and Rau 2005, followed by a historical account of Yami language teaching, from a grammatical syllabus (Dong and Rau 2000b to a communicative syllabus using a multimedia CD as a resource (Rau et al. 2005, to the development of interactive on-line learning based on the digital archiving project. We discuss the methods used and challenges of each stage of preparing Yami teaching materials, and present a proposal for rethinking pedagogical models for e-learning.

  7. PUREX Deactivation Health and Safety documentation

    Energy Technology Data Exchange (ETDEWEB)

    Dodd, E.N. III

    1995-01-01

    The purpose of the PUREX Deactivation Project is to establish a passively safe and environmentally secure configuration of PUREX at the Hanford Site, and to preserve that configuration for a 10-year horizon. The 10-year horizon is used to predict future maintenance requirements and represents they typical time duration expended to define, authorize, and initiate the follow-on Decontamination and Decommissioning (D&D) activities. This document was prepared to increase attention to worker safety issues during the deactivation project and, as such, identifies the documentation and programs associated with PUREX Deactivation Health and Safety.

  8. ELECTRICAL SUPPORT SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    Roy, S.

    2004-01-01

    The purpose of this revision of the System Design Description (SDD) is to establish requirements that drive the design of the electrical support system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience/users are design engineers. This type of SDD both ''leads'' and ''trails'' the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to electrical support systems are obtained from the ''Project Functional and Operational Requirements'' (F andOR) (Siddoway 2003). Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), and fire hazards analyses. The above-mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canon and Leitner 2003) requirements. This SDD contains several appendices that include supporting information. Appendix B lists key system charts, diagrams, drawings, and lists, and Appendix C includes a list of system procedures

  9. [Efficiency of computer-based documentation in long-term care--preliminary project].

    Science.gov (United States)

    Lüngen, Markus; Gerber, Andreas; Rupprecht, Christoph; Lauterbach, Karl W

    2008-06-01

    In Germany the documentation of processes in long-term care is mainly paper-based. Planning, realization and evaluation are not supported in an optimal way. In a preliminary study we evaluated the consequences of the introduction of a computer-based documentation system using handheld devices. We interviewed 16 persons before and after introducing the computer-based documentation and assessed costs for the documentation process and administration. The results show that reducing costs is likely. The job satisfaction of the personnel increased, more time could be spent for caring for the residents. We suggest further research to reach conclusive results.

  10. Text document classification

    Czech Academy of Sciences Publication Activity Database

    Novovičová, Jana

    č. 62 (2005), s. 53-54 ISSN 0926-4981 R&D Projects: GA AV ČR IAA2075302; GA AV ČR KSK1019101; GA MŠk 1M0572 Institutional research plan: CEZ:AV0Z10750506 Keywords : document representation * categorization * classification Subject RIV: BD - Theory of Information

  11. The MetaLex Document Server : Legal Documents as Versioned Linked Data

    NARCIS (Netherlands)

    Hoekstra, R.; Aroyo, L.; Welty, C.; Alani, H.; Taylor, J.; Bernstein, A.; Kagal, L.; Noy, N.; Blomqvist, E.

    2011-01-01

    This paper introduces the MetaLex Document Server (MDS), an ongoing project to improve access to legal sources (regulations, court rulings) by means of a generic legal XML syntax (CEN MetaLex) and Linked Data. The MDS defines a generic conversion mechanism from legacy legal XML syntaxes to CEN

  12. ELECTRICAL SUPPORT SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    S. Roy

    2004-06-24

    The purpose of this revision of the System Design Description (SDD) is to establish requirements that drive the design of the electrical support system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience/users are design engineers. This type of SDD both ''leads'' and ''trails'' the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to electrical support systems are obtained from the ''Project Functional and Operational Requirements'' (F&OR) (Siddoway 2003). Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), and fire hazards analyses. The above-mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canon and Leitner 2003) requirements. This SDD contains several appendices that include supporting information. Appendix B lists key system charts, diagrams, drawings, and lists, and Appendix C includes a list of system procedures.

  13. PUREX Deactivation Health and Safety documentation

    International Nuclear Information System (INIS)

    Dodd, E.N. III.

    1995-01-01

    The purpose of the PUREX Deactivation Project is to establish a passively safe and environmentally secure configuration of PUREX at the Hanford Site, and to preserve that configuration for a 10-year horizon. The 10-year horizon is used to predict future maintenance requirements and represents they typical time duration expended to define, authorize, and initiate the follow-on Decontamination and Decommissioning (D ampersand D) activities. This document was prepared to increase attention to worker safety issues during the deactivation project and, as such, identifies the documentation and programs associated with PUREX Deactivation Health and Safety

  14. Comment and response document for the UMTRA Project vitro processing site completion report Salt Lake City, Utah. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This Comment and Response Document is a series of UMTRA document review forms regarding the UMTRA Project Vitro Processing Site Completion Report for Salt Lake City, Utah in March, 1995. The completion report provides evidence that the final Salt Lake City, Utah, processing site property conditions are in accordance with the approved design and that all U.S. Environmental Protection Agency (EPA) standards have been satisfied. Included as appendices to support the stated conclusions are the record drawings; a summary of grid test results; contract specifications and construction drawings, the EPA standards (40 CFR Part 192); the audit, inspection, and surveillance summary; the permit information; and project photographs. The principal objective of the remedial action at Salt Lake City is to remove the tailings from the processing site, render the site free of contamination to EPA standards, and restore the site to the final design grade elevations. Each section is evaluated in detail to check all aspects of above report, especially the inclusion of adequate verification data. Each review form contains a section entitled State of Utah Response and Action, which is an explanation or correction of DOE criticisms of the report

  15. Documentation Panels Enhance Teacher Education Programs

    Science.gov (United States)

    Warash, Bobbie Gibson

    2005-01-01

    Documentation of children's projects is advantageous to their learning process and is also a good method for student teachers to observe the process of learning. Documentation panels are a unique way to help student teachers understand how children learn. Completing a panel requires a student teacher to think through a process. Teachers must learn…

  16. Repository of not readily available documents for project W-320

    Energy Technology Data Exchange (ETDEWEB)

    Conner, J.C.

    1997-04-18

    The purpose of this document is to provide a readily available source of the technical reports needed for the development of the safety documentation provided for the waste retrieval sluicing system (WRSS), designed to remove the radioactive and chemical sludge from tank 241-C-106, and transport that material to double-shell tank 241-AY-102 via a new, temporary, shielded, encased transfer line.

  17. Repository of not readily available documents for project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1997-01-01

    The purpose of this document is to provide a readily available source of the technical reports needed for the development of the safety documentation provided for the waste retrieval sluicing system (WRSS), designed to remove the radioactive and chemical sludge from tank 241-C-106, and transport that material to double-shell tank 241-AY-102 via a new, temporary, shielded, encased transfer line

  18. How organisation of architecture documentation affects architectural knowledge retrieval

    NARCIS (Netherlands)

    de Graaf, K.A.; Liang, P.; Tang, A.; Vliet, J.C.

    A common approach to software architecture documentation in industry projects is the use of file-based documents. This approach offers a single-dimensional arrangement of the architectural knowledge. Knowledge retrieval from file-based architecture documentation is efficient if the organisation of

  19. OCRWM baseline management procedure for document identifiers

    International Nuclear Information System (INIS)

    1993-03-01

    This procedure establishes a uniform numbering system (document identifier) for all Program and project technical, cost, and schedule baselines, and selected management and procurement documents developed for and controlled by the Office of Civilian Radioactive Waste Management (OCRWM) for the Civilian Radioactive Waste Management System (CRWMS). The document identifier defined in this procedure is structured to ensure that the relational integrity between configuration items (CIs) and their associated documentation and software is maintained, traceable, categorical, and retrievable for the life of the program

  20. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  1. EUDISED: European Documentation and Information System for Education. Volume II, National Reports.

    Science.gov (United States)

    Council of Europe, Strasbourg (France). Documentation Center for Education in Europe.

    This study briefly describes the documentation and information projects of seven nations, stressing their use in the field of education. The sections are: (1) automated documentation and the human sciences in France, (2) documentation for education and the social sciences in the Federal Republic of Germany, (3) mechanized projects in library work…

  2. Authentication/authorization issues and fulltext document migration for the CERN Document Server

    CERN Document Server

    Kaplun, Samuele; Farina, Fabio; Šimko, Tibor

    2007-01-01

    This thesis describes a master degree project, ending studies at Università degli Studi di Milano-Bicocca of Computer Science, Milano. This work has been realized at the European Organization of Nuclear Research (CERN), in Geneva. The aim of the project was to enhance CDS Invenio, a digital library software developed by CERN, in the authentication/authorization area, to develop an automatic migration tool for moving documents from the legacy architecture and to develop an extension to Python in C for solving indexing time issues.

  3. LCS Content Document Application

    Science.gov (United States)

    Hochstadt, Jake

    2011-01-01

    My project at KSC during my spring 2011 internship was to develop a Ruby on Rails application to manage Content Documents..A Content Document is a collection of documents and information that describes what software is installed on a Launch Control System Computer. It's important for us to make sure the tools we use everyday are secure, up-to-date, and properly licensed. Previously, keeping track of the information was done by Excel and Word files between different personnel. The goal of the new application is to be able to manage and access the Content Documents through a single database backed web application. Our LCS team will benefit greatly with this app. Admin's will be able to login securely to keep track and update the software installed on each computer in a timely manner. We also included exportability such as attaching additional documents that can be downloaded from the web application. The finished application will ease the process of managing Content Documents while streamlining the procedure. Ruby on Rails is a very powerful programming language and I am grateful to have the opportunity to build this application.

  4. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  5. CASK/MSC/WP PREPARATION SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    S. Drummond

    2005-01-01

    The purpose of this system description document (SDD) is to establish requirements that drive the design of the Cask/MSC/WP preparation system and their bases to allow the design effort to proceed to license application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design, as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience and users are design engineers. This type of SDD both leads and trails the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. This SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. This SDD addresses the ''Project Requirements Document'' (PRD) (Canori and Leitner 2003 [DIRS 166275]) requirements. Additional PRD requirements may be cited, as applicable, to drive the design of specific aspects of the system, with justifications provided in the basis. Functional and operational requirements applicable to this system are obtained from the ''Project Functional and Operational Requirements'' (F and OR) (Curry 2004 [DIRS 170557]) document. Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (BSC 2004 [DIRS 171599]) and the preclosure safety analyses

  6. NILDE, Network Inter Library Document Exchange: An Italian Document Delivery System

    Science.gov (United States)

    Brunetti, F.; Gasperini, A.; Mangiaracina, S.

    2007-10-01

    This poster presents NILDE, a document delivery system supporting the exchange of documents via the internet. The system has been set up by the Central Library of the National Research Council of Bologna (Italy) in order to make use of new internet technology, to promote cooperation between Italian university libraries and research libraries, and to achieve quick response times in satisfying DD requests. The Arcetri Astrophysical Observatory Library was the first astronomical library to join the NILDE project from its earliest days in 2002. Many were the reasons for this choice: automation of the DD processes, security and reliability of the network, creation of usage statistics and reports, reduction of DD System management costs and so on. This work describes the benefits of NILDE and discusses the role of an organized document delivery system as an important tool to cope with the difficult constraints of the publishing market.

  7. SNF AGING SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    L.L. Swanson

    2005-04-06

    The purpose of this system description document (SDD) is to establish requirements that drive the design of the spent nuclear fuel (SNF) aging system and associated bases, which will allow the design effort to proceed. This SDD will be revised at strategic points as the design matures. This SDD identifies the requirements and describes the system design, as it currently exists, with emphasis on attributes of the design provided to meet the requirements. This SDD is an engineering tool for design control; accordingly, the primary audience and users are design engineers. This SDD is part of an iterative design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD follows the design with regard to the description of the system. The description provided in the SDD reflects the current results of the design process. Throughout this SDD, the term aging cask applies to vertical site-specific casks and to horizontal aging modules. The term overpack is a vertical site-specific cask that contains a dual-purpose canister (DPC) or a disposable canister. Functional and operational requirements applicable to this system were obtained from ''Project Functional and Operational Requirements'' (F&OR) (Curry 2004 [DIRS 170557]). Other requirements that support the design process were taken from documents such as ''Project Design Criteria Document'' (PDC) (BSC 2004 [DES 171599]), ''Site Fire Hazards Analyses'' (BSC 2005 [DIRS 172174]), and ''Nuclear Safety Design Bases for License Application'' (BSC 2005 [DIRS 171512]). The documents address requirements in the ''Project Requirements Document'' (PRD) (Canori and Leitner 2003 [DIRS 166275]). This SDD includes several appendices. Appendix A is a Glossary; Appendix B is a list of key system charts

  8. SNF AGING SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    L.L. Swanson

    2005-01-01

    The purpose of this system description document (SDD) is to establish requirements that drive the design of the spent nuclear fuel (SNF) aging system and associated bases, which will allow the design effort to proceed. This SDD will be revised at strategic points as the design matures. This SDD identifies the requirements and describes the system design, as it currently exists, with emphasis on attributes of the design provided to meet the requirements. This SDD is an engineering tool for design control; accordingly, the primary audience and users are design engineers. This SDD is part of an iterative design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD follows the design with regard to the description of the system. The description provided in the SDD reflects the current results of the design process. Throughout this SDD, the term aging cask applies to vertical site-specific casks and to horizontal aging modules. The term overpack is a vertical site-specific cask that contains a dual-purpose canister (DPC) or a disposable canister. Functional and operational requirements applicable to this system were obtained from ''Project Functional and Operational Requirements'' (F andOR) (Curry 2004 [DIRS 170557]). Other requirements that support the design process were taken from documents such as ''Project Design Criteria Document'' (PDC) (BSC 2004 [DES 171599]), ''Site Fire Hazards Analyses'' (BSC 2005 [DIRS 172174]), and ''Nuclear Safety Design Bases for License Application'' (BSC 2005 [DIRS 171512]). The documents address requirements in the ''Project Requirements Document'' (PRD) (Canori and Leitner 2003 [DIRS 166275]). This SDD includes several appendices. Appendix A is a Glossary; Appendix B is a list of key system charts, diagrams, drawings, lists and additional supporting information; and Appendix C is a list of

  9. 76 FR 24507 - HUD Multifamily Rental Project Closing Documents: Notice Announcing Final Approved Documents and...

    Science.gov (United States)

    2011-05-02

    ... transactions, although these are familiar roles in commercial lending transactions. Accordingly, HUD has... advantage of this language is that it identifies the specific, longstanding, and familiar types of... the documents, HUD is limiting its role and giving lenders more ability to address any problems that...

  10. Quality Management of Measurements incl. Documentation

    DEFF Research Database (Denmark)

    Tosello, Guido; De Chiffre, Leonardo

    2004-01-01

    -Nürnberg, Chair for Quality Management and Manufacturing-Oriented Metrology (Germany). 'Metro-E-Learn' project proposes to develop and implement a coherent learning and competence chain that leads from introductory and foundation e-courses in initial manufacturing engineering studies towards higher....... Machine tool testing 9. The role of manufacturing metrology for QM 10. Inspection planning 11. Quality management of measurements incl. Documentation 12. Advanced manufacturing measurement technology The present report (which represents the section 11 - Quality management of measurements incl....... Documentation – of the e-learning system) is part of the contribution of the Department for Manufacturing Engineering and Management (IPL) / Centre for Geometrical Metrology (CGM) at the Technical University of Denmark to the MINERVA EU project mentioned above....

  11. Goal-oriented rectification of camera-based document images.

    Science.gov (United States)

    Stamatopoulos, Nikolaos; Gatos, Basilis; Pratikakis, Ioannis; Perantonis, Stavros J

    2011-04-01

    Document digitization with either flatbed scanners or camera-based systems results in document images which often suffer from warping and perspective distortions that deteriorate the performance of current OCR approaches. In this paper, we present a goal-oriented rectification methodology to compensate for undesirable document image distortions aiming to improve the OCR result. Our approach relies upon a coarse-to-fine strategy. First, a coarse rectification is accomplished with the aid of a computationally low cost transformation which addresses the projection of a curved surface to a 2-D rectangular area. The projection of the curved surface on the plane is guided only by the textual content's appearance in the document image while incorporating a transformation which does not depend on specific model primitives or camera setup parameters. Second, pose normalization is applied on the word level aiming to restore all the local distortions of the document image. Experimental results on various document images with a variety of distortions demonstrate the robustness and effectiveness of the proposed rectification methodology using a consistent evaluation methodology that encounters OCR accuracy and a newly introduced measure using a semi-automatic procedure.

  12. Streamlining of the Decontamination and Demolition Document Preparation Process

    International Nuclear Information System (INIS)

    Durand, Nick; Meincke, Carol; Peek, Georgianne

    1999-01-01

    During the past five years, the Sandia National Labo- ratories Decontamination, Decommissioning, Demolition, and Reuse (D3R) Program has evolved and become more focused and efficient. Historical approaches to project documentation, requirements, and drivers are discussed detailing key assumptions, oversight authority, and proj- ect approvals. Discussion of efforts to streamline the D3R project planning and preparation process include the in- corporation of the principles of graded approach, Total Quality Management, and the Observational Method (CH2MHILL April 1989).1 Process improvements were realized by clearly defining regulatory requirements for each phase of a project, establishing general guidance for the program and combining project-specific documents to eliminate redundant and unneeded information. Proc- ess improvements to cost, schedule, and quality are dis- cussed in detail for several projects

  13. Areva - 2011 Reference document; Areva - Document de reference 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    After having indicated the person responsible of this document and the legal account auditors, and provided some financial information, this document gives an overview of the different risk factors existing in the company: law risks, industrial and environmental risks, operational risks, risks related to large projects, market and liquidity risks. Then, after having recalled the history and evolution of the company and the evolution of its investments over the last five years, it proposes an overview of Areva's activities on the markets of nuclear energy and renewable energies, of its clients and suppliers, of its strategy, of the activities of its different departments. Other information are provided: company's flow chart, estate properties (plants, equipment), an analysis of its financial situation, its research and development policy, the present context, profit previsions or estimations, management organization and operation

  14. CASK/MSC/WP PREPARATION SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    S. Drummond

    2005-04-12

    The purpose of this system description document (SDD) is to establish requirements that drive the design of the Cask/MSC/WP preparation system and their bases to allow the design effort to proceed to license application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design, as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience and users are design engineers. This type of SDD both leads and trails the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. This SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. This SDD addresses the ''Project Requirements Document'' (PRD) (Canori and Leitner 2003 [DIRS 166275]) requirements. Additional PRD requirements may be cited, as applicable, to drive the design of specific aspects of the system, with justifications provided in the basis. Functional and operational requirements applicable to this system are obtained from the ''Project Functional and Operational Requirements'' (F&OR) (Curry 2004 [DIRS 170557]) document. Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (BSC 2004 [DIRS 171599]) and the preclosure safety analyses.

  15. Management of technical documents: a projection at the University of Zulia

    Directory of Open Access Journals (Sweden)

    Ana Judith Paredes Chacin

    2015-11-01

    Full Text Available Objective. This paper analyze comprehensively and systematically the principles of organization and technical procedure, which support document management based on the use of information technologies. Method. We developed a study based on the documentary descriptive method in the context of the Dirección de Infraestructura (Dinfra from the Universidad del Zulia. Results. We find evidence of efficiency in the processes that support the management of technical documents: Plans, metrics and memories generated by the Dinfra. Conclusion. The conceptual basis of organizational and technical archives contribute to the systematization, shelter save and documental preservation, and ensure the timely retrieval of technical information for the management of the University of Zulia.

  16. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  17. Electronic document management at Sizewell B

    International Nuclear Information System (INIS)

    Rippon, Simon.

    1996-01-01

    Sizewell ''B'', Britain's first PWR, officially opened on March 25 1996, will now rely for its document management on a sophisticated computer-based system. One of the largest single engineering projects ever to be commissioned on one site in Britain, Sizewell ''B'' accommodates more than 300,000 documents, including over 200,000 drawings. The electronic document management system will provide a number of important benefits, including a more direct method of maintaining the station's Configuration Management and hence maintaining high safety standards; improved turnaround in plant modification proposals (PMP); significant time and cost savings in managing vital records; and increased productivity. (Author)

  18. Yeu and Noirmoutier islands - Electric connection to the offshore wind farm. Brochure 'Electric connection of the offshore wind farm to the Yeu and Noirmoutier islands' - Consultation file, December 2015, District of Vendee. Document of contribution to the public debate. Yeu and Noirmoutier islands offshore wind farm project - Project commissioner file

    International Nuclear Information System (INIS)

    Boyadjis, Jean-Marc; Corallo, Christian

    2015-05-01

    After a brief presentation of the context, a first document presents the connection characteristics, the general route of the electrical connection, how the sea and ground environment is taken into account, how the population is consulted for the project, the organisation of the public inquiry. The second document presents the consultation file with a description of the adopted solution and main characteristics of the project of connection of offshore wind farms about the Yeu and Noirmoutier islands, an analysis of the initial condition of the environment (physical and natural environment, landscapes and heritage, human and social-economic context), a description and a comparative analysis of proposed beams for the underwater connection, landfall and underground connection, and the planned continuation of the project (consultation, administrative procedure, planning). The next document aims at presenting the project before public consultation: objectives, underwater and underground connections with some of their technical characteristics, planning. Another document also presents the offshore wind farm project, its energetic and technical characteristics, how it is integrated into its environment (stakes and challenges, impacts on landscape and on activities), how it is an example of the development of offshore wind energy sector. It is completed by several appendices containing a variety of data on these issues. A last document is a presentation of the project by the project commissioner (RTE) which notably addresses how technical and environmental issues are to be addressed

  19. Project W-211 initial tank retrieval systems year 2000 compliance assessment project plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-211. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  20. GAUDI-Architecture design document

    CERN Document Server

    Mato, P

    1998-01-01

    98-064 This document is the result of the architecture design phase for the LHCb event data processing applications project. The architecture of the LHCb software system includes its logical and physical structure which has been forged by all the strategic and tactical decisions applied during development. The strategic decisions should be made explicitly with the considerations for the trade-off of each alternative. The other purpose of this document is that it serves as the main material for the scheduled architecture review that will take place in the next weeks. The architecture review will allow us to identify what are the weaknesses or strengths of the proposed architecture as well as we hope to obtain a list of suggested changes to improve it. All that well before the system is being realized in code. It is in our interest to identify the possible problems at the architecture design phase of the software project before much of the software is implemented. Strategic decisions must be cross checked caref...

  1. Documentation of torture victims, assessment of the start procedure for medico-legal documentation.

    Science.gov (United States)

    Mandel, Lene; Worm, Lise

    2007-01-01

    A Pilot Study was performed at the Rehabilitation and Research Centre for Torture Victims (RCT) in Copenhagen in order to explore the possibilities for adding a medico-legal documentation component to the rehabilitation of torture victims already taking place. It describes the process and results on implementing medico-legal documentation in a rehabilitative setting. A modified version of the Guidelines in the Istanbul Protocol was developed on the basis of the review of literature and current practices described in "Documentation of torture victims, implementation of medico-legal protocols". The modified guidelines were tested on five clients. The aim was twofold: 1) To assess the client's attitude towards the idea of adding a documentation component to the rehabilitation process and: 2) To assess the practical circumstances of implementing the Istanbul Protocol in the everyday life of a rehabilitation centre. Results show that all five clients were positive towards the project and found comfort in being able to contribute to the fight against impunity. Also, the Pilot Study demonstrated that a large part of the medico-legal documentation was already obtained in the rehabilitation process. It was however not accessible due to lack of systematization and a data registering system. There are thus important synergies in collecting data for rehabilitation and documentation but a joint database system is necessary to realize these synergies.

  2. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  3. Project W-519 TWRS privatization phase 1 infrastructure year 2000 compliance assessment project plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-519. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  4. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  5. Project management approach for the Waste Area Grouping 6 Closure/Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-07-01

    This document has been developed as a preliminary definition of the Waste Area Grouping (WAG) 6 Closure Project Management Approach. The purpose of this document is to identify the roles and responsibilities of the various project team members and to identify the project scope, schedule and budget. This document is intended to be a living document. As information develops, this document will be revised to create a WAG 6 Project Management Plan (PMP). The PMP will provide additional focus to the information contained in this document. The information required will be available as the selected alternative for remediation of WAG 6 is approved and Remedial Action Plans are conceptualized. This document has been reviewed against, and is intended to be consistent with, the Environmental Restoration Program Management Plan

  6. AVLIS documentation overview and tables of contents

    International Nuclear Information System (INIS)

    1984-01-01

    Three documents constitute the executive summary series in Data Package III: this document (Documentation Overview and Tables of Contents (E001)) plus the AVLIS Production Plant Executive Summary (E010) and the AVLIS Production Plant Overall Design Report (E020). They provide progressively greater detail on the key information and conclusions contained within the data package. The Executive Summary and Overall Design Report present summaries of each Data Package III document. They are intended to provide a global overview of AVLIS Production Plant deployment including program planning, project management, schedules, engineering design, production, operations, capital cost, and operating cost. The purpose of Overview and Tables of Contents is threefold: to briefly review AVLIS goals for Data Package III documentation, to present an overview of the contents of the data package, and to provide a useful guide to information contained in the numerous documents comprising the package

  7. UMTRA Ground Water Project management action process document

    International Nuclear Information System (INIS)

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards

  8. Canister storage building design basis accident analysis documentation

    International Nuclear Information System (INIS)

    KOPELIC, S.D.

    1999-01-01

    This document provides the detailed accident analysis to support HNF-3553, Spent Nuclear Fuel Project Final Safety Analysis Report, Annex A, ''Canister Storage Building Final Safety Analysis Report.'' All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report

  9. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  10. Project W-151 Tank 101-AZ Waste Retrieval System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-151. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  11. Teaching Integrity in Empirical Research: A Protocol for Documenting Data Management and Analysis

    Science.gov (United States)

    Ball, Richard; Medeiros, Norm

    2012-01-01

    This article describes a protocol the authors developed for teaching undergraduates to document their statistical analyses for empirical research projects so that their results are completely reproducible and verifiable. The protocol is guided by the principle that the documentation prepared to accompany an empirical research project should be…

  12. Documentation of 'Care-Packages' for Children in OECD's 2003 Tax/Ben Model, December 2006

    DEFF Research Database (Denmark)

    Hansen, Hans

    This working paper contains documentation for the modelling of schemes implemented in OECD's 2003 Tax/Ben model for use in the 'Carearchitecture' project. The documentation also includes schemes already in the model and used in the calculations for the project. The documented schemes include...... personal taxation, parental leave benefits, payment for childcare, child benefits and housing benefits in Denmark, Sweden, Norway, Finland, Great Britain and Germany....

  13. Earth System Documentation (ES-DOC) Preparation for CMIP6

    Science.gov (United States)

    Denvil, S.; Murphy, S.; Greenslade, M. A.; Lawrence, B.; Guilyardi, E.; Pascoe, C.; Treshanksy, A.; Elkington, M.; Hibling, E.; Hassell, D.

    2015-12-01

    During the course of 2015 the Earth System Documentation (ES-DOC) project began its preparations for CMIP6 (Coupled Model Inter-comparison Project 6) by further extending the ES-DOC tooling ecosystem in support of Earth System Model (ESM) documentation creation, search, viewing & comparison. The ES-DOC online questionnaire, the ES-DOC desktop notebook, and the ES-DOC python toolkit will serve as multiple complementary pathways to generating CMIP6 documentation. It is envisaged that institutes will leverage these tools at different points of the CMIP6 lifecycle. Institutes will be particularly interested to know that the documentation burden will be either streamlined or completely automated.As all the tools are tightly integrated with the ES-DOC web-service, institutes can be confident that the latency between documentation creation & publishing will be reduced to a minimum. Published documents will be viewable with the online ES-DOC Viewer (accessible via citable URL's). Model inter-comparison scenarios will be supported using the ES-DOC online Comparator tool. The Comparator is being extended to:• Support comparison of both Model descriptions & Simulation runs;• Greatly streamline the effort involved in compiling official tables.The entire ES-DOC ecosystem is open source and built upon open standards such as the Common Information Model (CIM) (versions 1 and 2).

  14. Canister storage building design basis accident analysis documentation

    Energy Technology Data Exchange (ETDEWEB)

    KOPELIC, S.D.

    1999-02-25

    This document provides the detailed accident analysis to support HNF-3553, Spent Nuclear Fuel Project Final Safety Analysis Report, Annex A, ''Canister Storage Building Final Safety Analysis Report.'' All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report.

  15. Enabling Sex Workers to Document Violence (India and Cambodia ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Digital advocacy techniques have been used to document human rights abuses and communicate these to people of influence, but these have yet to be systematically applied to sex worker-led advocacy. This project is based on the assumption that enabling sex workers to document violations and amplify their advocacy ...

  16. The documentation of product configuration systems: A framework and an IT solution

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Haug, Anders

    2017-01-01

    for maintenance, further development, system quality and communication with domain experts. Product models are the main communication and documentation tools used in PCS projects. Recent studies have shown that up-to-date documentation for the PCS is often lacking due to the significant amount of work required...... system is proposed that is capable of retrieving knowledge from the PCS and thus generating the product model. Our framework and IT documentation system were developed and tested at a case company on five different projects. The results confirm that benefits can be achieved by using the proposed...

  17. Documentation of Cultural Heritage Objects

    Directory of Open Access Journals (Sweden)

    Jon Grobovšek

    2013-09-01

    Full Text Available EXTENDED ABSTRACT:The first and important phase of documentation of cultural heritage objects is to understand which objects need to be documented. The entire documentation process is determined by the characteristics and scope of the cultural heritage object. The next question to be considered is the expected outcome of the documentation process and the purpose for which it will be used. These two essential guidelines determine each stage of the documentation workflow: the choice of the most appropriate data capturing technology and data processing method, how detailed should the documentation be, what problems may occur, what the expected outcome is, what it will be used for, and the plan for storing data and results. Cultural heritage objects require diverse data capturing and data processing methods. It is important that even the first stages of raw data capturing are oriented towards the applicability of results. The selection of the appropriate working method can facilitate the data processing and the preparation of final documentation. Documentation of paintings requires different data capturing method than documentation of buildings or building areas. The purpose of documentation can also be the preservation of the contemporary cultural heritage to posterity or the basis for future projects and activities on threatened objects. Documentation procedures should be adapted to our needs and capabilities. Captured and unprocessed data are lost unless accompanied by additional analyses and interpretations. Information on tools, procedures and outcomes must be included into documentation. A thorough analysis of unprocessed but accessible documentation, if adequately stored and accompanied by additional information, enables us to gather useful data. In this way it is possible to upgrade the existing documentation and to avoid data duplication or unintentional misleading of users. The documentation should be archived safely and in a way to meet

  18. IDC Re-Engineering Phase 2 Architecture Document.

    Energy Technology Data Exchange (ETDEWEB)

    Burns, John F.

    2015-12-01

    This document contains a description of the system architecture for the IDC Re-Engineering Phase 2 project. This is a draft version that primarily provides background information for understanding delivered Use Case Realizations.

  19. Summary of flat-plate solar array project documentation: Abstracts of published documents, 1975-1986, revision 1

    Science.gov (United States)

    Phillips, M. J.

    1986-01-01

    Abstracts of final reports, or the latest quarterly or annual, of the Flat-Plate Solar Array (FSA) Project Contractor of Jet Propulsion Laboratory (JPL) in-house activities are presented. Also presented is a list of proceedings and publications, by author, of work connected with the project. The aim of the program has been to stimulate the development of technology that will enable the private sector to manufacture and widely use photovoltaic systems for the generation of electricity in residential, commercial, industrial, and Government applications at a cost per watt that is competitive with utility generated power. FSA Project activities have included the sponsoring of research and development efforts in silicon refinement processes, advanced silicon sheet growth techniques, higher efficiency solar cells, solar cell/module fabrication processes, encapsulation, module/array engineering and reliability, and economic analyses.

  20. Knowledge Communication Through Visualizations in Project Management Documents

    DEFF Research Database (Denmark)

    Kampf, Constance

    Trust is difficult to locate, measure and define.  Yet, in terms of knowledge communication, Nonaka et al include trust as an experiential knowledge asset (2000). In 2000, Nonaka et al limited experiential knowledge assets to face-to-face interactions.  However, since then, technologies...... for supporting multimodal features of the Internet have developed to the point where it could be argued that virtual and face-to-face interactions can no longer be distinguished in terms of shared experience (Woolgar 2002). Thus, trust and other experiential knowledge assets can be understood to be present...... in Internet based communication.  To examine online trust from a knowledge communication perspective, this paper looks at the I35W bridge reconstruction project in Minneapolis through web-based communication by the Minnesota Department of Transportation (MnDOT) about the project. The MnDOT bridge...

  1. Improving the quality of nursing documentation: An action research project

    Directory of Open Access Journals (Sweden)

    Elisha M. Okaisu

    2014-12-01

    Conclusion: Improving nursing documentation involved complex challenges in this setting and demanded multiple approaches. Evidence-based practise was the foundation of changes in systems required to produce visible improvement in practise. The involved role of leadership in these efforts was very important.

  2. Waste Management System Description Document (WMSD)

    International Nuclear Information System (INIS)

    1992-02-01

    This report is an appendix of the ''Waste Management Description Project, Revision 1''. This appendix is about the interim approach for the technical baseline of the waste management system. It describes the documentation and regulations of the waste management system requirements and description. (MB)

  3. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  4. M2 priority screening system for near-term activities: Project documentation. Final report December 11, 1992--May 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-08-12

    From May through August, 1993, the M-2 Group within M Division at LANL conducted with the support of the LANL Integration and Coordination Office (ICO) and Applied Decision Analysis, Inc. (ADA), whose purpose was to develop a system for setting priorities among activities. This phase of the project concentrated on prioritizing near-tenn activities (i.e., activities that must be conducted in the next six months) necessary for setting up this new group. Potential future project phases will concentrate on developing a tool for setting priorities and developing annual budgets for the group`s operations. The priority screening system designed to address the near-term problem was developed, applied in a series of meeting with the group managers, and used as an aid in the assignment of tasks to group members. The model was intended and used as a practical tool for documenting and explaining decisions about near-term priorities, and not as a substitute for M-2 management judgment and decision-making processes.

  5. Cold Vacuum Drying Facility Design Basis Accident Analysis Documentation

    International Nuclear Information System (INIS)

    PIEPHO, M.G.

    1999-01-01

    This document provides the detailed accident analysis to support HNF-3553, Annex B, Spent Nuclear Fuel Project Final Safety Analysis Report, ''Cold Vacuum Drying Facility Final Safety Analysis Report (FSAR).'' All assumptions, parameters and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the FSAR

  6. The HAW project. Test storage of high-level radiation sources in the Asse salt mine. Documentation and assessment of the storage system

    International Nuclear Information System (INIS)

    Mueller, K.; Rothfuchs, T.

    1994-01-01

    The HAW project aimed primarily at studying the interaction between high-level radioactive waste moulds and rock salt as the respository medium. Another priority was the prototype development and testing of a technical system for the emplacement of high-level radioactive moulds in deep storage boreholes. To simulate real high-level radioactive wastes, special high-level radiation sources (Cs-137, Sr-90) were produced in the United States of America under a German-American cooperation contract, for carrying out the tests at the Asse salt mine. The components of the storage system are described, their position and task within the entire handling procedure explained. Questions of radiation protection and accident protection, of functioning and operating reliability, of quality assurance and examination of documents, materials, of manufacture and functioning, and of documentation are dealt with in detail. With a view to the planning of storage techniques for a mine respository, the experience of development and operation is recorded, and recommendation of further developments are given. Problems which arose during work on the HAW project were partly due to test-specific reasons and will not or not in this form occur in a mine respository. It was planned to start the test emplacement in 1987, and it could have been executed in 1993 after appropriate preparation and approval of the storage system by the mining authority and the Hanover TUEV in 1991. In December 1992, however, the Federal Government decided to give up to the project due to the uncertain licensing situation, and to immediately stop all preparatory work. (orig./HP) [de

  7. Managing one thousand designs documents: what the success of project has about that?; Gerenciando mil documentos de projetos: o que o sucesso do empreendimento tem com isso?

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Ailton C.; Pio, Bruno P. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Project Management Techniques based on PMI- Project Management Institute have become widely disseminated with showing results in performance improvements. In this paper is presented the improvement obtained in supervising projects in gas pipeline network deployments in Northeast of Brazil by the use of project good practices. The clear definition of project phases; the use of integrated management system; the application of check lists and the prioritization of the issue/approval of documents are examples of tools that impact on the processes of management, with emphasis on control of scope, time, quality and communication. To evaluate the results obtained with the use of these tools is made a comparison between the project of deployment of City Gates TermoFortaleza (CE) and Pedras de Fogo (PB), both belonging to the Program Extension of network Northeast pipeline. (author)

  8. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  9. Canister Storage Building (CSB) Design Basis Accident Analysis Documentation

    International Nuclear Information System (INIS)

    CROWE, R.D.; PIEPHO, M.G.

    2000-01-01

    This document provided the detailed accident analysis to support HNF-3553, Spent Nuclear Fuel Project Final Safety Analysis Report, Annex A, ''Canister Storage Building Final Safety Analysis Report''. All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report

  10. Canister Storage Building (CSB) Design Basis Accident Analysis Documentation

    International Nuclear Information System (INIS)

    CROWE, R.D.

    1999-01-01

    This document provides the detailed accident analysis to support ''HNF-3553, Spent Nuclear Fuel Project Final Safety, Analysis Report, Annex A,'' ''Canister Storage Building Final Safety Analysis Report.'' All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report

  11. W-320 Department of Health documentation

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    The purpose of this document is to gather information required to show that Project W-320 is in compliance with Washington State Department of Health requirements as specified in Radioactive Air Emissions Notice of Construction Project W-320, Tank 241-C-106 Sluicing, DOE/RL-95-45. Specifically, that W-320 is in compliance with ASME N509-1989 (Nuclear Power Plant Air-Cleaning Units and Components) and ASME N5 10-1989 (Testing of Nuclear Air Treatment Systems) for the 296-C-006 exhaust system

  12. W-320 Department of Health documentation

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-08-07

    The purpose of this document is to gather information required to show that Project W-320 is in compliance with Washington State Department of Health requirements as specified in Radioactive Air Emissions Notice of Construction Project W-320, Tank 241-C-106 Sluicing, DOE/RL-95-45. Specifically, that W-320 is in compliance with ASME N509-1989 (Nuclear Power Plant Air-Cleaning Units and Components) and ASME N5 10-1989 (Testing of Nuclear Air Treatment Systems) for the 296-C-006 exhaust system.

  13. 7 CFR 1753.49 - Closeout documents.

    Science.gov (United States)

    2010-01-01

    ... Construction Change Orders 1 1 224 Waiver and Release of Lien (from each supplier) 1 1 231 Certificate of... by inspection company or supplier) 1 None Final Key Map (when applicable) 1 1 None Final Central... the engineer that the project and all required documentation are satisfactory and complete...

  14. Clustering document fragments using background color and texture information

    Science.gov (United States)

    Chanda, Sukalpa; Franke, Katrin; Pal, Umapada

    2012-01-01

    Forensic analysis of questioned documents sometimes can be extensively data intensive. A forensic expert might need to analyze a heap of document fragments and in such cases to ensure reliability he/she should focus only on relevant evidences hidden in those document fragments. Relevant document retrieval needs finding of similar document fragments. One notion of obtaining such similar documents could be by using document fragment's physical characteristics like color, texture, etc. In this article we propose an automatic scheme to retrieve similar document fragments based on visual appearance of document paper and texture. Multispectral color characteristics using biologically inspired color differentiation techniques are implemented here. This is done by projecting document color characteristics to Lab color space. Gabor filter-based texture analysis is used to identify document texture. It is desired that document fragments from same source will have similar color and texture. For clustering similar document fragments of our test dataset we use a Self Organizing Map (SOM) of dimension 5×5, where the document color and texture information are used as features. We obtained an encouraging accuracy of 97.17% from 1063 test images.

  15. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  16. Wilmar joint market model, Documentation

    International Nuclear Information System (INIS)

    Meibom, P.; Larsen, Helge V.; Barth, R.; Brand, H.; Weber, C.; Voll, O.

    2006-01-01

    The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (Contract No. ENK5-CT-2002-00663). A User Shell implemented in an Excel workbook controls the Wilmar Planning Tool. All data are contained in Access databases that communicate with various sub-models through text files that are exported from or imported to the databases. The Joint Market Model (JMM) constitutes one of these sub-models. This report documents the Joint Market model (JMM). The documentation describes: 1. The file structure of the JMM. 2. The sets, parameters and variables in the JMM. 3. The equations in the JMM. 4. The looping structure in the JMM. (au)

  17. Wilmar joint market model, Documentation

    Energy Technology Data Exchange (ETDEWEB)

    Meibom, P.; Larsen, Helge V. [Risoe National Lab. (Denmark); Barth, R.; Brand, H. [IER, Univ. of Stuttgart (Germany); Weber, C.; Voll, O. [Univ. of Duisburg-Essen (Germany)

    2006-01-15

    The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (Contract No. ENK5-CT-2002-00663). A User Shell implemented in an Excel workbook controls the Wilmar Planning Tool. All data are contained in Access databases that communicate with various sub-models through text files that are exported from or imported to the databases. The Joint Market Model (JMM) constitutes one of these sub-models. This report documents the Joint Market model (JMM). The documentation describes: 1. The file structure of the JMM. 2. The sets, parameters and variables in the JMM. 3. The equations in the JMM. 4. The looping structure in the JMM. (au)

  18. Documentation control process of Brazilian multipurpose reactor: conceptual design and basic design

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Prates, Jose Eduardo; Longo, Guilherme Carneiro; Salvetti, Tereza Cristina

    2015-01-01

    Established in the scope of Plan of Action of the Ministry of Science, Technology and Innovation (PACTI/MCTI) in 2007, the construction of the Brazilian Multipurpose Reactor (RMB) is on the way. This type of reactor has a broad spectrum of applications in the nuclear field and related technologies such as the radioisotopes used as supplies in the production of radiopharmaceuticals, with very much benefit to the Brazilian society being, therefore, the main goal of the Project. RMB Project consists of the following stages: site selection and site evaluation; design (conceptual design, basic design, detailed design and experimental design); construction (procurement, manufacturing; civil construction; electromechanical construction and assembling); commissioning; operation and decommissioning. Each stage requires adaptation of human resources for the stage schedule execution. The implementation of a project of this magnitude requires a complex project management, which covers not only technical, but also administrative areas. Licensing, financial resources, quality and document control systems, engineering are some of the areas involved in project success. The development of the conceptual and basic designs involved the participation of three main engineering companies. INTERTECHNE Consultores S.A. was in charge of conceptual and basic designs for conventional systems of buildings and infrastructure. INVAP S.E. was responsible for preparing the basic design of the reactor core and annexes. MRS Estudos Ambientais Ltda. has prepared documents for environmental licensing. This paper describes the procedures used during conceptual and basic design stages to control design documentation and flow of this documentation, involving the analysis and incorporation of comments from experts, control and storage of a volume of approximately 15,000 documents. (author)

  19. Documentation control process of Brazilian multipurpose reactor: conceptual design and basic design

    Energy Technology Data Exchange (ETDEWEB)

    Kibrit, Eduardo; Prates, Jose Eduardo; Longo, Guilherme Carneiro; Salvetti, Tereza Cristina, E-mail: ekibrit@ipen.br, E-mail: jeprates@ipen.br, E-mail: glongo@ipen.br, E-mail: salvetti@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    Established in the scope of Plan of Action of the Ministry of Science, Technology and Innovation (PACTI/MCTI) in 2007, the construction of the Brazilian Multipurpose Reactor (RMB) is on the way. This type of reactor has a broad spectrum of applications in the nuclear field and related technologies such as the radioisotopes used as supplies in the production of radiopharmaceuticals, with very much benefit to the Brazilian society being, therefore, the main goal of the Project. RMB Project consists of the following stages: site selection and site evaluation; design (conceptual design, basic design, detailed design and experimental design); construction (procurement, manufacturing; civil construction; electromechanical construction and assembling); commissioning; operation and decommissioning. Each stage requires adaptation of human resources for the stage schedule execution. The implementation of a project of this magnitude requires a complex project management, which covers not only technical, but also administrative areas. Licensing, financial resources, quality and document control systems, engineering are some of the areas involved in project success. The development of the conceptual and basic designs involved the participation of three main engineering companies. INTERTECHNE Consultores S.A. was in charge of conceptual and basic designs for conventional systems of buildings and infrastructure. INVAP S.E. was responsible for preparing the basic design of the reactor core and annexes. MRS Estudos Ambientais Ltda. has prepared documents for environmental licensing. This paper describes the procedures used during conceptual and basic design stages to control design documentation and flow of this documentation, involving the analysis and incorporation of comments from experts, control and storage of a volume of approximately 15,000 documents. (author)

  20. SANSMIC design document.

    Energy Technology Data Exchange (ETDEWEB)

    Weber, Paula D. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Rudeen, David Keith [GRAM, Inc., Albuquerque, NM (United States)

    2015-07-01

    The United States Strategic Petroleum Reserve (SPR) maintains an underground storage system consisting of caverns that were leached or solution mined in four salt domes located near the Gulf of Mexico in Texas and Louisiana. The SPR comprises more than 60 active caverns containing approximately 700 million barrels of crude oil. Sandia National Labo- ratories (SNL) is the geotechnical advisor to the SPR. As the most pressing need at the inception of the SPR was to create and fill storage volume with oil, the decision was made to leach the caverns and fill them simultaneously (leach-fill). Therefore, A.J. Russo developed SANSMIC in the early 1980s which allows for a transient oil-brine interface (OBI) making it possible to model leach-fill and withdrawal operations. As the majority of caverns are currently filled to storage capacity, the primary uses of SANSMIC at this time are related to the effects of small and large withdrawals, expansion of existing caverns, and projecting future pillar to diameter ratios. SANSMIC was identified by SNL as a priority candidate for qualification. This report continues the quality assurance (QA) process by documenting the "as built" mathematical and numerical models that comprise this document. The pro- gram flow is outlined and the models are discussed in detail. Code features that were added later or were not documented previously have been expounded. No changes in the code's physics have occurred since the original documentation (Russo, 1981, 1983) although recent experiments may yield improvements to the temperature and plume methods in the future.

  1. Multimodal document management in radiotherapy

    International Nuclear Information System (INIS)

    Fahrner, H.; Kirrmann, S.; Roehner, F.; Schmucker, M.; Hall, M.; Heinemann, F.

    2013-01-01

    Background and purpose: After incorporating treatment planning and the organisational model of treatment planning in the operating schedule system (BAS, 'Betriebsablaufsystem'), complete document qualities were embedded in the digital environment. The aim of this project was to integrate all documents independent of their source (paper-bound or digital) and to make content from the BAS available in a structured manner. As many workflow steps as possible should be automated, e.g. assigning a document to a patient in the BAS. Additionally it must be guaranteed that at all times it could be traced who, when, how and from which source documents were imported into the departmental system. Furthermore work procedures should be changed that the documentation conducted either directly in the departmental system or from external systems can be incorporated digitally and paper document can be completely avoided (e.g. documents such as treatment certificate, treatment plans or documentation). It was a further aim, if possible, to automate the removal of paper documents from the departmental work flow, or even to make such paper documents superfluous. In this way patient letters for follow-up appointments should automatically generated from the BAS. Similarly patient record extracts in the form of PDF files should be enabled, e.g. for controlling purposes. Method: The available document qualities were analysed in detail by a multidisciplinary working group (BAS-AG) and after this examination and assessment of the possibility of modelling in our departmental workflow (BAS) they were transcribed into a flow diagram. The gathered specifications were implemented in a test environment by the clinical and administrative IT group of the department of radiation oncology and subsequent to a detailed analysis introduced into clinical routine. Results: The department has succeeded under the conditions of the aforementioned criteria to embed all relevant documents in the departmental

  2. Achieving IT-supported standardized nursing documentation through participatory design

    DEFF Research Database (Denmark)

    Rasmussen, Stine Loft; Lyng, Karen Marie; Jensen, Sanne

    2012-01-01

    that support guideline-based highly structured standard documentation in a large organization with many stakeholders. Applying a participatory design (PD) approach at many organizational levels has involved the stakeholders actively in the design process. Developing a set of design principles has concurrently......In the Capital Region of Denmark a full-scale pilot project on IT-supported nursing documentation is - after running for two months at one full university hospital - showing promising results. In this paper we discuss participatory design as a method to design clinical documentation templates...

  3. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  4. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  5. Areva - 2011 Reference document

    International Nuclear Information System (INIS)

    2011-01-01

    After having indicated the person responsible of this document and the legal account auditors, and provided some financial information, this document gives an overview of the different risk factors existing in the company: law risks, industrial and environmental risks, operational risks, risks related to large projects, market and liquidity risks. Then, after having recalled the history and evolution of the company and the evolution of its investments over the last five years, it proposes an overview of Areva's activities on the markets of nuclear energy and renewable energies, of its clients and suppliers, of its strategy, of the activities of its different departments. Other information are provided: company's flow chart, estate properties (plants, equipment), an analysis of its financial situation, its research and development policy, the present context, profit previsions or estimations, management organization and operation

  6. Document Ranking in E-Extended Boolean Logic

    Czech Academy of Sciences Publication Activity Database

    Holub, M.; Húsek, Dušan; Pokorný, J.

    1996-01-01

    Roč. 4, č. 7 (1996), s. 3-17 ISSN 1310-0513. [Annual Colloquium on IR Research /19./. Aberdeen, 08.04.1997-09.04.1997] R&D Projects: GA ČR GA102/94/0728 Keywords : information retrieval * document ranking * extended Boolean logic

  7. GlottoVis : Visualizing Language Endangerment and Documentation

    NARCIS (Netherlands)

    Castermans, T.H.A.; Speckmann, B.; Verbeek, K.A.B.; Westenberg, M.A.; Hammarström, H.

    2017-01-01

    We present GlottoVis, a system designed to visualize language endangerment as collected by UNESCO and descriptive status as collected by the Glottolog project. Glottolog records bibliographic data for the world’s (lesser known) languages. Languages are documented with increasing detail, but the

  8. a Case Study in Documentation Production as Learning Tools Benefitting Multiple Stakeholders

    Science.gov (United States)

    Truesdale, T. J.; Hierlihy, B.; Jouan, P.

    2017-08-01

    The Fondation Strutt Foundation has taken on the conservation planning of the Strutt House as part of a P3 collaborative effort with the National Capital Commission (NCC). This paper will address three of the primary documents/data sets (documentary methodologies) being used on/for the Strutt House project. The Strutt House is a Recognized Federal Heritage Building and a significant example of Canadian modernist architecture. Stakeholder is a term often used in Architectural Projects reflecting an economic interest in success of the project. In conservation projects the stakeholder generally reflects social, cultural and/or economic interests in a given project. The Strutt House project has benefitted from stakeholders that have all been interested in the above, as well as the education of our future conservationists. The Strutt house was purchased from the architect's daughter in 2010, and as part of the acquisition, a Heritage Structure Report was commissioned and produced by PTAH Consultants Inc., Architects. The report forms the first of the primary referenced documents of this paper, including: a comprehensive photographic record of existing conditions; and, a building simulation model of the house `as designed/built'. This HSR and the accompanying data/documents have been adopted as the basis of an evolving document in the development of the Conservation Plan including: additional heritage surveys and technologies; traditional drawings, photographic and video records; and, a series of workshops on the structural stabilization efforts, thermography scans, and smoke/blow-door (air pressure) testing. In 2016, Pierre Jouan, a Master's thesis student from KU Leuvan, working with the Carleton University CIMS lab under the direction of Professor Mario Santana, and the FSF completed a 3-D scanning and photogrammetry workshop on the Strutt House and created a building information model (BIM model) from the collected data. The three primary documentation processes

  9. A CASE STUDY IN DOCUMENTATION PRODUCTION AS LEARNING TOOLS BENEFITTING MULTIPLE STAKEHOLDERS

    Directory of Open Access Journals (Sweden)

    T. J. Truesdale

    2017-08-01

    Full Text Available The Fondation Strutt Foundation has taken on the conservation planning of the Strutt House as part of a P3 collaborative effort with the National Capital Commission (NCC. This paper will address three of the primary documents/data sets (documentary methodologies being used on/for the Strutt House project. The Strutt House is a Recognized Federal Heritage Building and a significant example of Canadian modernist architecture. Stakeholder is a term often used in Architectural Projects reflecting an economic interest in success of the project. In conservation projects the stakeholder generally reflects social, cultural and/or economic interests in a given project. The Strutt House project has benefitted from stakeholders that have all been interested in the above, as well as the education of our future conservationists. The Strutt house was purchased from the architect’s daughter in 2010, and as part of the acquisition, a Heritage Structure Report was commissioned and produced by PTAH Consultants Inc., Architects. The report forms the first of the primary referenced documents of this paper, including: a comprehensive photographic record of existing conditions; and, a building simulation model of the house ‘as designed/built’. This HSR and the accompanying data/documents have been adopted as the basis of an evolving document in the development of the Conservation Plan including: additional heritage surveys and technologies; traditional drawings, photographic and video records; and, a series of workshops on the structural stabilization efforts, thermography scans, and smoke/blow-door (air pressure testing. In 2016, Pierre Jouan, a Master’s thesis student from KU Leuvan, working with the Carleton University CIMS lab under the direction of Professor Mario Santana, and the FSF completed a 3-D scanning and photogrammetry workshop on the Strutt House and created a building information model (BIM model from the collected data. The three primary

  10. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  11. Canister Storage Building (CSB) Design Basis Accident Analysis Documentation

    Energy Technology Data Exchange (ETDEWEB)

    CROWE, R.D.

    1999-09-09

    This document provides the detailed accident analysis to support ''HNF-3553, Spent Nuclear Fuel Project Final Safety, Analysis Report, Annex A,'' ''Canister Storage Building Final Safety Analysis Report.'' All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report.

  12. 75 FR 80517 - HUD Multifamily Rental Project Closing Documents-Revisions and Updates Notice of Information...

    Science.gov (United States)

    2010-12-22

    ... familiar with the updated closing documents, the existing closing documents, which these updated closing... assures the industry and the public that sufficient staff will be available and thoroughly familiar with... documents that are updated for current commercial legal standards, balanced with the public policy role that...

  13. Forensic 3D documentation of skin injuries

    DEFF Research Database (Denmark)

    Villa, Chiara

    2017-01-01

    An accurate and precise documentation of injuries is fundamental in a forensic pathological context. Photographs and manual measurements are taken of all injuries during autopsies, but ordinary photography projects a 3D wound on a 2D space. Using technologies such as photogrammetry, it is possible...... methods (p > 0.05). The results of intra- and inter-observer tests indicated perfect agreement between the observers with mean value differences of ≤ 0.02 cm. This study demonstrated the validity of using photogrammetry for documentation of injuries in a forensic pathological context. Importantly...

  14. Word Spotting for Indic Documents to Facilitate Retrieval

    Science.gov (United States)

    Bhardwaj, Anurag; Setlur, Srirangaraj; Govindaraju, Venu

    With advances in the field of digitization of printed documents and several mass digitization projects underway, information retrieval and document search have emerged as key research areas. However, most of the current work in these areas is limited to English and a few oriental languages. The lack of efficient solutions for Indic scripts has hampered information extraction from a large body of documents of cultural and historical importance. This chapter presents two relevant topics in this area. First, we describe the use of a script-specific keyword spotting for Devanagari documents that makes use of domain knowledge of the script. Second, we address the needs of a digital library to provide access to a collection of documents from multiple scripts. This requires intelligent solutions which scale across different scripts. We present a script-independent keyword spotting approach for this purpose. Experimental results illustrate the efficacy of our methods.

  15. Detailed Design Documentation, without the Pain

    Science.gov (United States)

    Ramsay, C. D.; Parkes, S.

    2004-06-01

    Producing detailed forms of design documentation, such as pseudocode and structured flowcharts, to describe the procedures of a software system:(1) allows software developers to model and discuss their understanding of a problem and the design of a solution free from the syntax of a programming language,(2) facilitates deeper involvement of non-technical stakeholders, such as the customer or project managers, whose influence ensures the quality, correctness and timeliness of the resulting system,(3) forms comprehensive documentation of the system for its future maintenance, reuse and/or redeployment.However, such forms of documentation require effort to create and maintain.This paper describes a software tool which is currently being developed within the Space Systems Research Group at the University of Dundee which aims to improve the utility of, and the incentive for, creating detailed design documentation for the procedures of a software system. The rationale for creating such a tool is briefly discussed, followed by a description of the tool itself, a summary of its perceived benefits, and plans for future work.

  16. Cold Vacuum Drying (CVD) Facility Design Basis Accident Analysis Documentation

    Energy Technology Data Exchange (ETDEWEB)

    PIEPHO, M.G.

    1999-10-20

    This document provides the detailed accident analysis to support HNF-3553, Annex B, Spent Nuclear Fuel Project Final Safety Analysis Report, ''Cold Vacuum Drying Facility Final Safety Analysis Report (FSAR).'' All assumptions, parameters and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the FSAR.

  17. Waste management project technical baseline description

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1997-01-01

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project

  18. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    Science.gov (United States)

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  19. International Nuclear Model personal computer (PCINM): Model documentation

    International Nuclear Information System (INIS)

    1992-08-01

    The International Nuclear Model (INM) was developed to assist the Energy Information Administration (EIA), U.S. Department of Energy (DOE) in producing worldwide projections of electricity generation, fuel cycle requirements, capacities, and spent fuel discharges from commercial nuclear reactors. The original INM was developed, maintained, and operated on a mainframe computer system. In spring 1992, a streamlined version of INM was created for use on a microcomputer utilizing CLIPPER and PCSAS software. This new version is known as PCINM. This documentation is based on the new PCINM version. This document is designed to satisfy the requirements of several categories of users of the PCINM system including technical analysts, theoretical modelers, and industry observers. This document assumes the reader is familiar with the nuclear fuel cycle and each of its components. This model documentation contains four chapters and seven appendices. Chapter Two presents the model overview containing the PCINM structure and process flow, the areas for which projections are made, and input data and output reports. Chapter Three presents the model technical specifications showing all model equations, algorithms, and units of measure. Chapter Four presents an overview of all parameters, variables, and assumptions used in PCINM. The appendices present the following detailed information: variable and parameter listings, variable and equation cross reference tables, source code listings, file layouts, sample report outputs, and model run procedures. 2 figs

  20. BMR: Benchmarking Metrics Recommender for Personnel issues in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Angel Garcia-Crespo

    2009-12-01

    Full Text Available This paper presents an architecture which applies document similarity measures to the documentation produced during the phases of software development in order to generate recommendations of process and people metrics for similar projects. The application makes a judgment of similarity of the Service Provision Offer (SPO document of a new proposed project to a collection of Project History Documents (PHD, stored in a repository of unstructured texts. The process is carried out in three stages: firstly, clustering of the Offer document with the set of PHDs which are most similar to it; this provides the initial indication of whether similar previous projects exist, and signifies similarity. Secondly, determination of which PHD in the set is most comparable with the Offer document, based on various parameters: project effort, project duration (time, project resources (members/size of team, costs, and sector(s involved, indicating comparability of projects. The comparable parameters are extracted using the GATE Natural Language Processing architecture. Lastly, a recommendation of metrics for the new project is made, which is based on the transferability of the metrics of the most similar and comparable PHD extracted, here referred to as recommendation.

  1. E-nursing documentation as a tool for quality assurance.

    Science.gov (United States)

    Rajkovic, Vladislav; Sustersic, Olga; Rajkovic, Uros

    2006-01-01

    The article presents the results of a project with which we describe the reengineering of nursing documentation. Documentation in nursing is an efficient tool for ensuring quality health care and consequently quality patient treatment along the whole clinical path. We have taken into account the nursing process and patient treatment based on Henderson theoretical model of nursing that consists of 14 basic living activities. The model of new documentation enables tracing, transparency, selectivity, monitoring and analyses. All these factors lead to improvements of a health system as well as to improved safety of patients and members of nursing teams. Thus the documentation was developed for three health care segments: secondary and tertiary level, dispensaries and community health care. The new quality introduced to the documentation process by information and communication technology is presented by a database model and a software prototype for managing documentation.

  2. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  3. Language Documentation and Sociolinguistics | Iwuchukwu | Lwati ...

    African Journals Online (AJOL)

    The position of this paper is that one of the criteria of a genuine language documentation project is that it must represent the language as it is used e.g. the breaking of kola or pouring of libation by the Igbo, the naming ceremony, new yam festival, burial and marriage ceremonies in Bekwarra, Lokaa, Ibibio, Efik, Yoruba, ...

  4. PHOTOGRAMMETRIC AND LIDAR DOCUMENTATION OF THE ROYAL CHAPEL (CATHEDRAL-MOSQUE OF CORDOBA, SPAIN

    Directory of Open Access Journals (Sweden)

    J. Cardenal

    2012-07-01

    Full Text Available At present, cultural heritage documentation projects use a variety of spatial data acquisition techniques such as conventional surveying, photogrammetry and terrestrial laser scanning. This paper deals with a full documentation project based on all those techniques in the Royal Chapel located in the Cathedral-Mosque of Cordoba in Spain, declared World Heritage Site by UNESCO. At present, the Royal Chapel is under study for a detailed diagnostic analysis in order to evaluate the actual state of the chapel, pathologies, construction phases, previous restoration works, material analysis, etc. So in order to assist the evaluation, a documentation project with photogrammetric and laser scanner techniques (TLS has been carried out. With this purpose, accurate cartographic and 3D products, by means of the integration of both image and laser based techniques, were needed to register all data collected during the diagnostic analysis.

  5. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  6. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  7. Annotated bibliography National Environmental Policy Act (NEPA) documents for Sandia National Laboratories

    International Nuclear Information System (INIS)

    Harris, J.M.

    1995-04-01

    The following annotated bibliography lists documents prepared by the Department of Energy (DOE), and predecessor agencies, to meet the requirements of the National Environmental Policy Act (NEPA) for activities and facilities at Sandia National Laboratories sites. For each NEPA document summary information and a brief discussion of content is provided. This information may be used to reduce the amount of time or cost associated with NEPA compliance for future Sandia National Laboratories projects. This summary may be used to identify model documents, documents to use as sources of information, or documents from which to tier additional NEPA documents

  8. Annotated bibliography National Environmental Policy Act (NEPA) documents for Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Harris, J.M.

    1995-04-01

    The following annotated bibliography lists documents prepared by the Department of Energy (DOE), and predecessor agencies, to meet the requirements of the National Environmental Policy Act (NEPA) for activities and facilities at Sandia National Laboratories sites. For each NEPA document summary information and a brief discussion of content is provided. This information may be used to reduce the amount of time or cost associated with NEPA compliance for future Sandia National Laboratories projects. This summary may be used to identify model documents, documents to use as sources of information, or documents from which to tier additional NEPA documents.

  9. Uranium Mill Tailings Remedial Action Project: technical approach document

    International Nuclear Information System (INIS)

    1986-05-01

    The Uranium Mill Tailings Radiation Control Act of 1978, PL95-604, grants the Secretary of Energy authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards from inactive uranium mill sites. These cleanup actions are to be performed in compliance with the EPA standards (40 CFR Part 192) which became final on March 7, 1983. This document describes the general technical approaches and design criteria that are adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPA standards

  10. Digital Tools for Documenting and Conserving Bahrain's Built Heritage for Posterity

    Science.gov (United States)

    Mezzino, D.; Barazzetti, L.; Santana Quintero, M.; El-Habashi, A.

    2017-08-01

    Documenting the physical characteristics of historic structures is the first step for any preventive maintenance, monitoring, conservation, planning and promotion action. Metric documentation supports informative decision-making process for property owners, site managers, public officials, and conservators. This information serves also a broader purpose, over time, it becomes the primary means by which scholars, heritage professionals, and the general public understand a site that radically changed or disappeared. Further, documentation supports monitoring as well as the character-defining elements analysis, relevant to define the values of the building for the local and international community. The awareness of these concepts oriented the digital documentation and training activities, developed between 2016 and 2017, for the Bahrain Authority for Culture and Antiquities (BACA) in Bahrain. The developed activities had two main aims: a) support the local staff in using specific recording techniques to efficiently document and consequently preserve built heritage sites with appropriate accuracy and in a relatively short period; b) develop a pilot project in collaboration with BACA to validate the capacity of the team to accurately document and produce measured records for the conservation and management of Bahrain built heritage. The documentation project has been developed by a multidisciplinary team of experts from BACA, Carleton Immersive Media Studio (CIMS), Carleton University, Canada and a contracted researcher from the Gicarus Lab, Politecnico di Milano (POLIMI) in Italy. In the training activities, the participants have been exposed to a wide range of recording techniques, illustrating them the selection criteria for the most suitable one, according to requirements, site specifications, categories of values identified for the various built elements, and budget. The pilot project has been tested on three historical structures, both with strong connotations in

  11. Project management plan for the isotopes facilities deactivation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    Purpose of the deactivation project is to place former isotopes production facilities at ORNL in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance. This management plan was prepared to document project objectives, define organizational relationships and responsibilities, and outline the management control systems. The project has adopted the strategy of deactivating the simple facilities first. The plan provides a road map for the quality assurance program and identifies other documents supporting the Isotopes Facilities Deactivation Project

  12. Preparation of plant and system design description documents

    International Nuclear Information System (INIS)

    1989-01-01

    This standard prescribes the purpose, scope, organization, and content of plant design requirements (PDR) documents and system design descriptions (SDDs), to provide a unified approach to their preparation and use by a project as the principal means to establish the plant design requirements and to establish, describe, and control the individual system designs from conception and throughout the lifetime of the plant. The Electric Power Research Institute's Advanced Light Water Reactor (LWR) Requirements Document should be considered for LWR plants

  13. Optimization of the Document Placement in the RFID Cabinet

    Directory of Open Access Journals (Sweden)

    Kiedrowicz Maciej

    2016-01-01

    Full Text Available The study is devoted to the issue of optimization of the document placement in a single RFID cabinet. It has been assumed that the optimization problem means the reduction of archivization time with respect to the information on all documents with RFID tags. Since the explicit form of the criterion function remains unknown, for the purpose of its approximation, the regression analysis method has been used. The method uses data from a computer simulation of the process of archiving data about documents. To solve the optimization problem, the modified gradient projection method has been used.

  14. Supplemental design requirements document solid waste operations complex

    International Nuclear Information System (INIS)

    Ocampo, V.P.; Boothe, G.F.; Broz, D.R.; Eaton, H.E.; Greager, T.M.; Huckfeldt, R.A.; Kooiker, S.L.; Lamberd, D.L.; Lang, L.L.; Myers, J.B.

    1994-11-01

    This document provides additional and supplemental information to the WHC-SD-W112-FDC-001, WHC-SD-W113-FDC-001, and WHC-SD-W100-FDC-001. It provides additional requirements for the design and summarizes Westinghouse Hanford Company key design guidance and establishes the technical baseline agreements to be used for definitive design common to the Solid Waste Operations Complex (SWOC) Facilities (Project W-112, Project W-113, and WRAP 2A)

  15. Information Management Platform for Data Analytics and Aggregation (IMPALA) System Design Document

    Science.gov (United States)

    Carnell, Andrew; Akinyelu, Akinyele

    2016-01-01

    The System Design document tracks the design activities that are performed to guide the integration, installation, verification, and acceptance testing of the IMPALA Platform. The inputs to the design document are derived from the activities recorded in Tasks 1 through 6 of the Statement of Work (SOW), with the proposed technical solution being the completion of Phase 1-A. With the documentation of the architecture of the IMPALA Platform and the installation steps taken, the SDD will be a living document, capturing the details about capability enhancements and system improvements to the IMPALA Platform to provide users in development of accurate and precise analytical models. The IMPALA Platform infrastructure team, data architecture team, system integration team, security management team, project manager, NASA data scientists and users are the intended audience of this document. The IMPALA Platform is an assembly of commercial-off-the-shelf (COTS) products installed on an Apache-Hadoop platform. User interface details for the COTS products will be sourced from the COTS tools vendor documentation. The SDD is a focused explanation of the inputs, design steps, and projected outcomes of every design activity for the IMPALA Platform through installation and validation.

  16. Web-based document and content management with off-the-shelf software

    International Nuclear Information System (INIS)

    Schuster, J.

    1999-01-01

    This, then, is the current status of the project: Since we made the switch to Intradoc, we are now treating the project as a document and image management system. In reality, it could be considered a document and content management system since we can manage almost any file input to the system such as video or audio. At present, however, we are concentrating on images. As mentioned above, my CRADA funding was only targeted at including thumbnails of images in Intradoc. We still had to modify Intradoc so that it would compress images submitted to the system. All processing of files submitted to Intradoc is handled in what is called the Document Refinery. Even though MrSID created thumbnails in the process of compressing an image, work needed to be done to somehow build this capability into the Document Refinery. Therefore we made the decision to contract the Intradoc Engineering Team to perform this custom development work. To make Intradoc even more capable of handling images, we have also contracted for customization of the Document Refinery to accept Adobe PhotoShop and Illustrator file in their native format

  17. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  18. Defense transuranic waste program strategy document

    International Nuclear Information System (INIS)

    1982-07-01

    This document summarizes the strategy for managing transuranic (TRU) wastes generated in defense and research activities regulated by the US Department of Energy. It supercedes a document issued in July 1980. In addition to showing how current strategies of the Defense Transuranic Waste Program (DTWP) are consistent with the national objective of isolating radioactive wastes from the biosphere, this document includes information about the activities of the Transuranic Lead Organization (TLO). To explain how the DTWP strategy is implemented, this document also discusses how the TLO coordinates and integrates the six separate elements of the DTWP: (1) Waste Generation Site Activities, (2) Storage Site Activities, (3) Burial Site Activities, (4) Technology Development, (5) Transportation Development, and (6) Permanent Disposal. Storage practices for TRU wastes do not pose short-term hazards to public health and safety or to the environment. Isolation of TRU wastes in a deep-mined geologic repository is considered the most promising of the waste disposal alternatives available. This assessment is supported by the DOE Record of Decision to proceed with research and development work at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico - a deep-mined geologic research and development project. In support of the WIPP research project and the permanent disposal of TRU waste, the DTWP strategy for the near term will concentrate on completion of procedures and the design and construction of all facilities necessary to certify newly-generated (NG) and stored TRU wastes for emplacement in the WIPP. In addition, the strategy involves evaluating alternatives for disposing of some transuranic wastes by methods which may allow for on-site disposal of these wastes and yet preserve adequate margins of safety to protect public health and the environment

  19. Cold Vacuum Drying facility design basis accident analysis documentation

    International Nuclear Information System (INIS)

    CROWE, R.D.

    2000-01-01

    This document provides the detailed accident analysis to support HNF-3553, Annex B, Spent Nuclear Fuel Project Final Safety Analysis Report (FSAR), ''Cold Vacuum Drying Facility Final Safety Analysis Report.'' All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the FSAR. The calculations in this document address the design basis accidents (DBAs) selected for analysis in HNF-3553, ''Spent Nuclear Fuel Project Final Safety Analysis Report'', Annex B, ''Cold Vacuum Drying Facility Final Safety Analysis Report.'' The objective is to determine the quantity of radioactive particulate available for release at any point during processing at the Cold Vacuum Drying Facility (CVDF) and to use that quantity to determine the amount of radioactive material released during the DBAs. The radioactive material released is used to determine dose consequences to receptors at four locations, and the dose consequences are compared with the appropriate evaluation guidelines and release limits to ascertain the need for preventive and mitigative controls

  20. Cold Vacuum Drying facility design basis accident analysis documentation

    Energy Technology Data Exchange (ETDEWEB)

    CROWE, R.D.

    2000-08-08

    This document provides the detailed accident analysis to support HNF-3553, Annex B, Spent Nuclear Fuel Project Final Safety Analysis Report (FSAR), ''Cold Vacuum Drying Facility Final Safety Analysis Report.'' All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the FSAR. The calculations in this document address the design basis accidents (DBAs) selected for analysis in HNF-3553, ''Spent Nuclear Fuel Project Final Safety Analysis Report'', Annex B, ''Cold Vacuum Drying Facility Final Safety Analysis Report.'' The objective is to determine the quantity of radioactive particulate available for release at any point during processing at the Cold Vacuum Drying Facility (CVDF) and to use that quantity to determine the amount of radioactive material released during the DBAs. The radioactive material released is used to determine dose consequences to receptors at four locations, and the dose consequences are compared with the appropriate evaluation guidelines and release limits to ascertain the need for preventive and mitigative controls.

  1. Digital Documentation of Ships in Cultural Heritage: a European Review

    Science.gov (United States)

    Colson, A.

    2017-08-01

    Ships of different shapes and times are lying in harbours, on land or in museums, all over the world. Our aim with this paper was to review work done on digital documentation of ships in Cultural Heritage based on different initiatives in Europe using Coordinate Measuring Machine (Newport Ship and Doel 1); Total Station Theodolite (Vasa and Mary-Rose) and Laser scanning (LaScanMar and Traditional boats of Ireland). Our results showed that some discrepancy exist between the projects, in terms of techniques and expertise at hand. Furthermore, few guidelines have been in practice but only for Archaeology and Ethnology. However, no standards are existing. Three focuses have emerged: documentation of single ship elements, monitoring of the long-term deformation processes and the documentation of collections of ships. We discussed the diversity of expert's background and the complexity of comparability between projects. In conclusion, guidelines are necessary to enable a common ground for all professions to work together, e.g. in Architecture. This path must be taken now for digital documentation of ships, if not information and knowledge will be lost on the way.

  2. The Analysis of Heterogeneous Text Documents with the Help of the Computer Program NUD*IST

    Directory of Open Access Journals (Sweden)

    Christine Plaß

    2000-12-01

    Full Text Available On the basis of a current research project we discuss the use of the computer program NUD*IST for the analysis and archiving of qualitative documents. Our project examines the social evaluation of spectacular criminal offenses and we identify, digitize and analyze documents from the entire 20th century. Since public and scientific discourses are examined, the data of the project are extraordinarily heterogeneous: scientific publications, court records, newspaper reports, and administrative documents. We want to show how to transfer general questions into a systematic categorization with the assistance of NUD*IST. Apart from the functions, possibilities and limitations of the application of NUD*IST, concrete work procedures and difficulties encountered are described. URN: urn:nbn:de:0114-fqs0003211

  3. Project of Atomic Energy Technology Record

    International Nuclear Information System (INIS)

    Song, K. C.; Ko, Y. C.; Kwon, K. C.

    2012-12-01

    Project of the Atomic Energy Technology Record is the project that summarizes and records whole process, from the background to the performance, of each category in all fields of nuclear science technology which have been researched and developed at KAERI. This project includes development of Data And Documents Advanced at KAERI. This project includes development of Data And Documents Advanced Management System(DADAMS) to collect, organize and preserve various records occurred in each research and development process. In addition, it means the whole records related to nuclear science technology for the past, present and future. This report summarizes research contents and results of 'Project of Atomic Energy Technology Record'. Section 2 summarizes the theoretical background, the current status of records management in KAERI and the overview of this project. And Section 3 to 6 summarize contents and results performed in this project. Section 3 is about the process of sectoral technology record, Section 4 summarizes the process of Information Strategy Master Plan(ISMP), Section 5 summarizes the development of Data And Documents Advanced Management System(DADAMS) and Section 6 summarizes the process of collecting, organizing and digitalizing of records

  4. Mental Status Documentation: Information Quality and Data Processes.

    Science.gov (United States)

    Weir, Charlene; Gibson, Bryan; Taft, Teresa; Slager, Stacey; Lewis, Lacey; Staggers, Nancy

    2016-01-01

    Delirium is a fluctuating disturbance of cognition and/or consciousness associated with poor outcomes. Caring for patients with delirium requires integration of disparate information across clinicians, settings and time. The goal of this project was to characterize the information processes involved in nurses' assessment, documentation, decisionmaking and communication regarding patients' mental status in the inpatient setting. VA nurse managers of medical wards (n=18) were systematically selected across the US. A semi-structured telephone interview focused on current assessment, documentation, and communication processes, as well as clinical and administrative decision-making was conducted, audio-recorded and transcribed. A thematic analytic approach was used. Five themes emerged: 1) Fuzzy Concepts, 2) Grey Data, 3) Process Variability 4) Context is Critical and 5) Goal Conflict. This project describes the vague and variable information processes related to delirium and mental status that undermine effective risk, prevention, identification, communication and mitigation of harm.

  5. Project Plan For Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation

  6. Document clustering methods, document cluster label disambiguation methods, document clustering apparatuses, and articles of manufacture

    Science.gov (United States)

    Sanfilippo, Antonio [Richland, WA; Calapristi, Augustin J [West Richland, WA; Crow, Vernon L [Richland, WA; Hetzler, Elizabeth G [Kennewick, WA; Turner, Alan E [Kennewick, WA

    2009-12-22

    Document clustering methods, document cluster label disambiguation methods, document clustering apparatuses, and articles of manufacture are described. In one aspect, a document clustering method includes providing a document set comprising a plurality of documents, providing a cluster comprising a subset of the documents of the document set, using a plurality of terms of the documents, providing a cluster label indicative of subject matter content of the documents of the cluster, wherein the cluster label comprises a plurality of word senses, and selecting one of the word senses of the cluster label.

  7. Software Tools Streamline Project Management

    Science.gov (United States)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  8. Development of a system for managing document delivery schedule(DDS) for NSSS system design

    International Nuclear Information System (INIS)

    Baek, S. H.; Baek, J. M.; Sohn, Y. S.; Shon, G. H.

    1999-01-01

    The construction of nuclear power plant is a long-term project from initial design to commercial operation. To accomplish NSSS (Nuclear Steam Supply System) system design successfully, the systematic and effective method for managing the system design product and interface correspondence with other organizations is required. To meet this requirement, a system has been developed to control the document delivery schedule, approval process and interface correspondence transmittal, and to report the documentation status periodically from the beginning of the YGN 5 and 6 project. This system is expected to contribute as the beginning step to development of integrated project management system. (author)

  9. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The US Department of Energy (DOE) Shippingport Station Decommissioning Project (SSDP) decontaminated and dismantled the world's first nuclear-fueled, commercial-size electric power plant. The SSDP programmatic goal direction for technology transfer is documentation of project management and operations experience. The objective is to provide future nuclear facility decommissioning projects with pertinent SSDP performance data for project assessment, planning, and operational implementation. This paper sets out access and availability directions for SSDP technology acquisition. Discusses are technology transfer definition; technology transfer products including topical and other project reports, professional-technical society presentations, other project liaison and media relations, visual documentation, and technology transfer data base; and retrieving SSDP information

  10. BUILDING FACADE DOCUMENTATION USING LASER SCANNING AND PHOTOGRAMMETRY AND DATA IMPLEMENTATION INTO BIM

    Directory of Open Access Journals (Sweden)

    M. Faltýnová

    2016-06-01

    Full Text Available A project started last year called MORE-CONNECT, which focuses on the renovation of buildings (especially building facades using prefabricated elements. The aim of this project is to create a competitive solution consisting of a technology and processes which enable fast, cost-effective renovation with minimal difficulties to inhabitants. Significant cost savings in renovation costs lies in the usage of prefabricated elements and the reduction of construction works on site. The precision of the prefabricated element depends on the precision of the construction, project and building documentation. This article offers an overview of the possible methods for building documentation and spatial data transfer into BIM (Building Information Modelling software. The description of methods focuses on laser scanning and photogrammetry (including RPAS based, its advantages, disadvantages and limitations according to the documented building, level of renovation, situation on site etc. The next part involves spatial data transfer into BIM software. A proposed solution is tested in a case study.

  11. Evolution of Safety Basis Documentation for the Fernald Site

    International Nuclear Information System (INIS)

    Brown, T.; Kohler, S.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    The objective of the Department of Energy's (DOE) Fernald Closure Project (FCP), in suburban Cincinnati, Ohio, is to safely complete the environmental restoration of the Fernald site by 2006. Over 200 out of 220 total structures, at this DOE plant site which processed uranium ore concentrates into high-purity uranium metal products, have been safely demolished, including eight of the nine major production plants. Documented Safety Analyses (DSAs) for these facilities have gone through a process of simplification, from individual operating Safety Analysis Reports (SARs) to a single site-wide Authorization Basis containing nuclear facility Bases for Interim Operations (BIOs) to individual project Auditable Safety Records (ASRs). The final stage in DSA simplification consists of project-specific Integrated Health and Safety Plans (I-HASPs) and Nuclear Health and Safety Plans (N-HASPs) that address all aspects of safety, from the worker in the field to the safety basis requirements preserving the facility/activity hazard categorization. This paper addresses the evolution of Safety Basis Documentation (SBD), as DSAs, from production through site closure

  12. Regulatory commitment management and the managing of licensing documents

    International Nuclear Information System (INIS)

    Roxey, T.E.

    1993-01-01

    The Regulatory Commitment Management (RCM) Project was designed to strengthen Baltimore Gas ampersand Electric's (BG ampersand E's) ability to identify, implement, and maintain regulatory commitments. The first part of this project involved the development of a clear commitment management process. The second part was the development of a tool that enhances the ability to retrieve information from documents, and the third part of the project dealt with the actual identification of historical commitments. This paper represents the first opportunity for BG ampersand E to discuss some of the success of the second part and the preliminary findings of the third part of the project

  13. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  14. DIGITAL TOOLS FOR DOCUMENTING AND CONSERVING BAHRAIN’S BUILT HERITAGE FOR POSTERITY

    Directory of Open Access Journals (Sweden)

    D. Mezzino

    2017-08-01

    Full Text Available Documenting the physical characteristics of historic structures is the first step for any preventive maintenance, monitoring, conservation, planning and promotion action. Metric documentation supports informative decision-making process for property owners, site managers, public officials, and conservators. This information serves also a broader purpose, over time, it becomes the primary means by which scholars, heritage professionals, and the general public understand a site that radically changed or disappeared. Further, documentation supports monitoring as well as the character-defining elements analysis, relevant to define the values of the building for the local and international community. The awareness of these concepts oriented the digital documentation and training activities, developed between 2016 and 2017, for the Bahrain Authority for Culture and Antiquities (BACA in Bahrain. The developed activities had two main aims: a support the local staff in using specific recording techniques to efficiently document and consequently preserve built heritage sites with appropriate accuracy and in a relatively short period; b develop a pilot project in collaboration with BACA to validate the capacity of the team to accurately document and produce measured records for the conservation and management of Bahrain built heritage. The documentation project has been developed by a multidisciplinary team of experts from BACA, Carleton Immersive Media Studio (CIMS, Carleton University, Canada and a contracted researcher from the Gicarus Lab, Politecnico di Milano (POLIMI in Italy. In the training activities, the participants have been exposed to a wide range of recording techniques, illustrating them the selection criteria for the most suitable one, according to requirements, site specifications, categories of values identified for the various built elements, and budget. The pilot project has been tested on three historical structures, both with strong

  15. Guidelines for the documentation of digital computer programs - approved 1974

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    This standard presents guidelines for the documentation of engineering and scientific computer programs. Good documentation promotes understanding, reduces duplication of effort, eases conversion to different computer environments and aids modification for extended applications. Good documentation is essential for implementation and effective use of programs obtained from other installations. Since the intention of this standard is to encourage better communication between the developer and user, it should be regarded as a guide rather than a set of rigid specifications. As a guide, it is sufficiently comprehensive to apply to large-scale programs intended for extensive external use. Not all features of this document are appropriate in all circumstances. In general, as the project complexity increases so does the need for more complete documentation. An organization may have special documentation requirements which supersede or extend these guidelines. This standard is a revision of ANS-STD.2-1967 and supersedes it

  16. methanization of organic matters. Guide for project developers

    International Nuclear Information System (INIS)

    2015-02-01

    This document aims at informing potential project developers (farmers, local communities, industrials) all along the creation of a methanization unit. It precisely indicates administrative procedures required to complete a project. It first presents some generalities about methanization (matters and their performance, methanization cycle, biogas), describes methanization processes (dry and humid), and valorisation processes (co-generation, hot water production, gas injection into the public network), presents digestate characteristics, and discusses benefits and drawbacks of methanization. The different steps of a project management are then analysed. Additional procedures are indicated, and risks and traps of methanization projects are highlighted. The document comes along with a large number of appendices which can be documents released by professional or public bodies

  17. NASAwide electronic publishing system: Prototype STI electronic document distribution, stage-4 evaluation report

    Science.gov (United States)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual frame work, functional description, and technical report server of the STI Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware, and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices, which arc contained in Part 2 of this document, consist of (1) STI EDD Project Plan, (2) Team members, (3) Phasing Schedules, (4) Accessing On-line Reports, and (5) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desktop publishing systems, and technical report servers to be able to provide to NASA's engineers, researchers, scientists, and external users the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  18. The computer integrated documentation project: A merge of hypermedia and AI techniques

    Science.gov (United States)

    Mathe, Nathalie; Boy, Guy

    1993-01-01

    To generate intelligent indexing that allows context-sensitive information retrieval, a system must be able to acquire knowledge directly through interaction with users. In this paper, we present the architecture for CID (Computer Integrated Documentation). CID is a system that enables integration of various technical documents in a hypertext framework and includes an intelligent browsing system that incorporates indexing in context. CID's knowledge-based indexing mechanism allows case based knowledge acquisition by experimentation. It utilizes on-line user information requirements and suggestions either to reinforce current indexing in case of success or to generate new knowledge in case of failure. This allows CID's intelligent interface system to provide helpful responses, based on previous experience (user feedback). We describe CID's current capabilities and provide an overview of our plans for extending the system.

  19. Managemant of NASA's major projects

    Science.gov (United States)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  20. AREVA 2009 reference document; AREVA document de reference 2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    This Reference Document contains information on the AREVA group's objectives, prospects and development strategies. It contains information on the markets, market shares and competitive position of the AREVA group. This information provides an adequate picture of the size of these markets and of the AREVA group's competitive position. Content: 1 - Person responsible for the Reference Document and Attestation by the person responsible for the Reference Document; 2 - Statutory and Deputy Auditors; 3 - Selected financial information; 4 - Risks: Risk management and coverage, Legal risk, Industrial and environmental risk, Operating risk, Risk related to major projects, Liquidity and market risk, Other risk; 5 - Information about the issuer: History and development, Investments; 6 - Business overview: Markets for nuclear power and renewable energies, AREVA customers and suppliers, Overview and strategy of the group, Business divisions, Discontinued operations: AREVA Transmission and Distribution; 7 - Organizational structure; 8 - Property, plant and equipment: Principal sites of the AREVA group, Environmental issues that may affect the issuer's; 9 - Analysis of and comments on the group's financial position and performance: Overview, Financial position, Cash flow, Statement of financial position, Events subsequent to year-end closing for 2009; 10 - Capital Resources; 11 - Research and development programs, patents and licenses; 12 -trend information: Current situation, Financial objectives; 13 - Profit forecasts or estimates; 14 - Administrative, management and supervisory bodies and senior management; 15 - Compensation and benefits; 16 - Functioning of corporate bodies; 17 - Employees; 18 - Principal shareholders; 19 - Transactions with related parties: French state, CEA, EDF group; 20 - Financial information concerning assets, financial positions and financial performance; 21 - Additional information: Share capital, Certificate of incorporation and

  1. From document to database: modernizing requirements management

    International Nuclear Information System (INIS)

    Giajnorio, J.; Hamilton, S.

    2007-01-01

    The creation, communication, and management of design requirements are central to the successful completion of any large engineering project, both technically and commercially. Design requirements in the Canadian nuclear industry are typically numbered lists in multiple documents created using word processing software. As an alternative, GE Nuclear Products implemented a central requirements management database for a major project at Bruce Power. The database configured the off-the-shelf software product, Telelogic Doors, to GE's requirements structure. This paper describes the advantages realized by this scheme. Examples include traceability from customer requirements through to test procedures, concurrent engineering, and automated change history. (author)

  2. IDC Re-Engineering Phase 2 System Specification Document Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Satpathi, Meara Allena [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    This document contains the system specifications derived to satisfy the system requirements found in the IDC System Requirements Document for the IDC Re-Engineering Phase 2 project. This System Specification Document (SSD) defines waveform data processing requirements for the International Data Centre (IDC) of the Comprehensive Nuclear Test Ban Treaty Organization (CTBTO). The routine processing includes characterization of events with the objective of screening out events considered to be consistent with natural phenomena or non-nuclear, man-made phenomena. This document does not address requirements concerning acquisition, processing and analysis of radionuclide data but does include requirements for the dissemination of radionuclide data and products.

  3. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    International Nuclear Information System (INIS)

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation

  4. Documentation: an effective tool in Farmer Field Schools

    NARCIS (Netherlands)

    Belder, den E.; Garcia, M.; Jansen, D.M.

    2006-01-01

    In the “Sustainable Coffee Project Peru”, relevant and well documented data has played an important role in supporting the learning processes of the Farmer Field Schools. This is illustrated here with three examples: a survey of the coffee farmers’ situation as a basis for developing the content of

  5. LDRD 149045 final report distinguishing documents.

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, Scott A.

    2010-09-01

    This LDRD 149045 final report describes work that Sandians Scott A. Mitchell, Randall Laviolette, Shawn Martin, Warren Davis, Cindy Philips and Danny Dunlavy performed in 2010. Prof. Afra Zomorodian provided insight. This was a small late-start LDRD. Several other ongoing efforts were leveraged, including the Networks Grand Challenge LDRD, and the Computational Topology CSRF project, and the some of the leveraged work is described here. We proposed a sentence mining technique that exploited both the distribution and the order of parts-of-speech (POS) in sentences in English language documents. The ultimate goal was to be able to discover 'call-to-action' framing documents hidden within a corpus of mostly expository documents, even if the documents were all on the same topic and used the same vocabulary. Using POS was novel. We also took a novel approach to analyzing POS. We used the hypothesis that English follows a dynamical system and the POS are trajectories from one state to another. We analyzed the sequences of POS using support vector machines and the cycles of POS using computational homology. We discovered that the POS were a very weak signal and did not support our hypothesis well. Our original goal appeared to be unobtainable with our original approach. We turned our attention to study an aspect of a more traditional approach to distinguishing documents. Latent Dirichlet Allocation (LDA) turns documents into bags-of-words then into mixture-model points. A distance function is used to cluster groups of points to discover relatedness between documents. We performed a geometric and algebraic analysis of the most popular distance functions and made some significant and surprising discoveries, described in a separate technical report.

  6. EDF Energies Nouvelles - 2010 Registration Document

    International Nuclear Information System (INIS)

    2011-01-01

    EDF Energies Nouvelles is a world leader in renewable energy electricity. The company develops, builds and operates clean energy power plants both for its own account and for third parties. Historically, EDF Energies Nouvelles primarily developed its business in two geographical areas, Europe and North America (U.S., Canada and Mexico). EDF Energies Nouvelles is a subsidiary of EDF, helping the Group to achieve its renewable energy goals. The EDF Group generates low-carbon electricity around the world and actively participates in the energy transition. EDF Energies Nouvelles prioritizes development of wind and photovoltaic solar capacity. As an integrated operator with global reach, EDF Energies Nouvelles covers the entire renewable energy chain, from development to operation and maintenance, and manages all project phases in-house. This document is EDF Energies Nouvelles' registration document for the year 2010. It contains information about Group profile, governance, business, investments, property, plant and equipment, management, financial position, employees, shareholders, etc. The document includes the half-year and full year financial reports

  7. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    Wells, J.L.

    1997-01-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  8. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    Science.gov (United States)

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  9. Technical documentation in support of the project-specific analysis for construction and operation of the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Lazaro, M.A.; Vinikour, W. [Argonne National Lab., IL (United States). Environmental Assessment Div.; Allison, T. [Argonne National Lab., IL (United States). Decision and Information Sciences Div.] [and others

    1996-09-01

    This document provides information that supports or supplements the data and impact analyses presented in the National Ignition Facility (NIF) Project-Specific Analysis (PSA). The purposes of NIF are to achieve fusion ignition in the laboratory for the first time with inertial confinement fusion (ICF) technology and to conduct high- energy-density experiments ins support of national security and civilian application. NIF is an important element in the DOE`s science-based SSM Program, a key mission of which is to ensure the reliability of the nation`s enduring stockpile of nuclear weapons. NIF would also advance the knowledge of basic and applied high-energy- density science and bring the nation a large step closer to developing fusion energy for civilian use. The NIF PSA includes evaluations of the potential environmental impacts of constructing and operating the facility at one of five candidate site and for two design options.

  10. Methodological Aspects of Architectural Documentation

    Directory of Open Access Journals (Sweden)

    Arivaldo Amorim

    2011-12-01

    Full Text Available This paper discusses the methodological approach that is being developed in the state of Bahia in Brazil since 2003, in architectural and urban sites documentation, using extensive digital technologies. Bahia has a vast territory with important architectural ensembles ranging from the sixteenth century to present day. As part of this heritage is constructed of raw earth and wood, it is very sensitive to various deleterious agents. It is therefore critical document this collection that is under threats. To conduct those activities diverse digital technologies that could be used in documentation process are being experimented. The task is being developed as an academic research, with few financial resources, by scholarship students and some volunteers. Several technologies are tested ranging from the simplest to the more sophisticated ones, used in the main stages of the documentation project, as follows: work overall planning, data acquisition, processing and management and ultimately, to control and evaluate the work. The activities that motivated this paper are being conducted in the cities of Rio de Contas and Lençóis in the Chapada Diamantina, located at 420 km and 750 km from Salvador respectively, in Cachoeira city at Recôncavo Baiano area, 120 km from Salvador, the capital of Bahia state, and at Pelourinho neighbourhood, located in the historic capital. Part of the material produced can be consulted in the website: < www.lcad.ufba.br>.

  11. Twente-One: cross language disclosure and retrieval of multimedia documents on sustainable development

    NARCIS (Netherlands)

    ter Stal, W.G.; ter Stal, W.G.; Beijert, J.H.; de Bruin, G.; de Jong, Franciska M.G.; van Gent, J.; Kraaij, W.; Netter, K.; de Bruin, G.J.; Smart, G.; van Gent, J.

    1998-01-01

    The Twenty-One project brings together environmental organisations, technology providers and research institutes from several European countries. The main objective of the project is to make documents on environmental issues—in particular, on the subject of sustainable development—available on

  12. Non-Profit/Higher Education Project Management Series: The Project Plan

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  13. Exploring, Documenting, and Improving Humanitarian Service Learning through Engineers Without Borders USA

    OpenAIRE

    Buchanan, Elizabeth; Berg, Devin; Lee, Tina; Buchanan, Elizabeth; Lacksonen, Tom

    2017-01-01

    Exploring, Documenting, and Improving Humanitarian Service Learning through Engineers without Borders-USA is a four-year project exploring a variety of challenges and opportunities in university-based service learning programs. Specifically, this project looks holistically at the inception and evolution of a new Engineers Without Borders USA chapter, while analyzing characteristics, values, and demographics of individuals involved in EWB community-based humanitarian projects in multiple chapt...

  14. Safety equipment list for the 241-SY-101 RAPID mitigation project

    Energy Technology Data Exchange (ETDEWEB)

    MORRIS, K.L.

    1999-06-29

    This document provides the safety classification for the safety (safety class and safety RAPID Mitigation Project. This document is being issued as the project SEL until the supporting authorization basis documentation, this document will be superseded by the TWRS SEL (LMHC 1999), documentation istlralized. Upon implementation of the authorization basis significant) structures, systems, and components (SSCS) associated with the 241-SY-1O1 which will be updated to include the information contained herein.

  15. Safety equipment list for the 241-SY-101 RAPID mitigation project

    International Nuclear Information System (INIS)

    Morris, K.L.

    1999-01-01

    This document provides the safety classification for the safety (safety class and safety RAPID Mitigation Project. This document is being issued as the project SEL until the supporting authorization basis documentation, this document will be superseded by the TWRS SEL (LMHC 1999), documentation istlralized. Upon implementation of the authorization basis significant) structures, systems, and components (SSCS) associated with the 241-SY-1O1 which will be updated to include the information contained herein

  16. H2020 692819 SIMPATICO - D1.1: Project Management Plan

    OpenAIRE

    Forner, Pamela; Gerosa, Matteo; Folograna, Antonio

    2017-01-01

    This document is the deliverable “D1.1 – Project Management Plan” of the European project “SIMPATICO - SIMplifying the interaction with Public Administration Through Information technology for Citizens and cOmpanies” (hereinafter also referred to as “SIMPATICO”, project reference: 692819). The SIMPATICO Project Management Plan (PMP) is the main planning document and describes how major aspects of the project are managed, monitored and controlled. It is intended to provide gu...

  17. Smart Gun Technology project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  18. 23 CFR 660.112 - Project development.

    Science.gov (United States)

    2010-04-01

    ... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid procedures and procedures documented in the statewide agreement. (b) The FH projects shall be designed in...

  19. Bibliography and documents issued list through fiscal year 1982

    International Nuclear Information System (INIS)

    1982-12-01

    This document is a bibliography of the published reports, papers, and documents of the Basalt Waste Isolation Project (BWIP) that have been publicly released during fiscal years 1978 to 1982. A brief history of the National Waste Terminal Storage Program and the BWIP is included to provide the reader with the scope of activities involved in the technical endeavor to identify a potential geologic repository site for the permanent isolation of radioactive wastes. The bibliography is organized by scientific discipline and in chronological order. An author index is provided after the bibliography

  20. Defense Partnerships: Documenting Trends and Emerging Topics for Action

    Science.gov (United States)

    2015-03-01

    between the air force research lab and antelope Valley College (aVC) results in increases in number of scientists, engi- neers, and technicians from...guiding document, tool, or resource should address best prac- tices for project valuation , what types of formalized arrangements are acceptable, and

  1. Evolving Techniques of Documentation of a World Heritage Site in Lahore

    Science.gov (United States)

    Arif, R.; Essa, K.

    2017-08-01

    Lahore is an ancient, culturally rich city amidst which are embedded two world heritage sites. The state of historic preservation in the country is impoverished with a dearth of training and poor documentation skills, thus these monuments are decaying and in dire need of attention. The Aga Khan Cultural Service - Pakistan is one of the first working in heritage conservation in the country. AKCSP is currently subjecting the UNESCO World Heritage site of the Mughal era Lahore Fort to an intensive and multi-faceted architectural documentation process. This is presented here as a case study to chart the evolution of documentation techniques and enunciate the spectrum of challenges faced in the documentation of an intricate Mughal heritage site for conservation in the Pakistani context. 3D - laser scanning is used for the purpose of heritage conservation for the first time, and since has been utilised on heritage buildings and urban fabric in ongoing projects. These include Lahore Fort, Walled city of Lahore as well as the Baltit Fort, a project restored in the past, assisting in the maintenance of conserved buildings. The documentation team is currently discovering the full potential of this technology especially its use in heritage conservation simultaneously overcoming challenges faced. Moreover negotiating solutions to auto-generate 2D architectural drawings from the 3D pointcloud output. The historic architecture is juxtaposed with contemporary technology in a region where such a combination is rarely found. The goal is to continually develop the documentation methodologies whilst investigating other technologies in the future.

  2. EVOLVING TECHNIQUES OF DOCUMENTATION OF A WORLD HERITAGE SITE IN LAHORE

    Directory of Open Access Journals (Sweden)

    R. Arif

    2017-08-01

    Full Text Available Lahore is an ancient, culturally rich city amidst which are embedded two world heritage sites. The state of historic preservation in the country is impoverished with a dearth of training and poor documentation skills, thus these monuments are decaying and in dire need of attention. The Aga Khan Cultural Service - Pakistan is one of the first working in heritage conservation in the country. AKCSP is currently subjecting the UNESCO World Heritage site of the Mughal era Lahore Fort to an intensive and multi-faceted architectural documentation process. This is presented here as a case study to chart the evolution of documentation techniques and enunciate the spectrum of challenges faced in the documentation of an intricate Mughal heritage site for conservation in the Pakistani context. 3D - laser scanning is used for the purpose of heritage conservation for the first time, and since has been utilised on heritage buildings and urban fabric in ongoing projects. These include Lahore Fort, Walled city of Lahore as well as the Baltit Fort, a project restored in the past, assisting in the maintenance of conserved buildings. The documentation team is currently discovering the full potential of this technology especially its use in heritage conservation simultaneously overcoming challenges faced. Moreover negotiating solutions to auto-generate 2D architectural drawings from the 3D pointcloud output. The historic architecture is juxtaposed with contemporary technology in a region where such a combination is rarely found. The goal is to continually develop the documentation methodologies whilst investigating other technologies in the future.

  3. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  4. Homeless Education Project 1996-97. Scope of Program.

    Science.gov (United States)

    West Contra Costa Unified School District, CA.

    The documents in this collection relate to the Homeless Education Project conducted in the elementary and secondary schools of the West Contra Costa Unified School District (California). The first document is a chart describing the project and its main goals: (1) an accelerated curriculum in reading and mathematics; (2) effective procedures for…

  5. Daylight case study building. A working document of Task 21. Daylight in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Kristensen, P E

    1997-05-01

    This report describes 16 buildings, that have been selected as Task 21 case studies. Totally 15 buildings will be monitored and described according to the procedures developed in Task 21. One case study building is in design stage, the new ISE Headquarters in Freiburg, and this project has been selected as a case study on building design. The monitoring programme for the buildings runs through 1997 until mid 1998. The present document serves as a basic document describing the case studies, until the projects will be described in more detail, including monitoring results, towards the end of the Task. (au)

  6. Documentation of literature on the subject of forest decline

    International Nuclear Information System (INIS)

    Reuther, M.; Kirchner, M.; Lang, B.

    1991-01-01

    The Bavarian project group for research into the effect of environmental pollutants (PBWU) coordinates environmental research in Bavaria and, in the framework of this task, collects and documents literature on the complex of subjects forest decline (GSF report 37/86; first updating GSF report 5/88). Said literature is accessible at PBWU online via the literature administration system Lars and can be researched there in database mode. The second updating of the literature documentation now printed (GSF report 4/91, as at October 1990) comprises some 1600 quotations (corresponding to a total of about 4500 documents recorded); this literature can be consulted in the archieves of PBWU or borrowed. The documentation covers work on all aspects of the subject forest decline but makes no claim to completeness; this being literature that came to the knowledge of PBWU within the framework of its coordination task and, as a rule, without systematically searching, and which is processed bibliographically. The documentation is arranged in alphabetic order by author names; the annex contains a catch word register. (VHE) [de

  7. 7 CFR 3402.23 - Documentation of progress on funded projects.

    Science.gov (United States)

    2010-01-01

    ... RESEARCH, EDUCATION, AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE FOOD AND AGRICULTURAL SCIENCES... of Fellows supported by any special international study or thesis/dissertation research allowance and... Research Information System (CRIS). The CRIS database contains narrative project information, progress...

  8. Technical Support Document: 50% Energy Savings for Quick-Service Restaurants

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Jian; Schrock, D. W.; Fisher, D. R.; Livchak, A.; Zabrowski, D. A.; Athalye, Rahul A.; Liu, Bing

    2010-09-30

    Document describing PNNL's project to develop a package of energy efficiency measures that demonstrate the feasibility of achieving a 50% energy savings for quick-service restaurants with a simple payback of 5 years or less.

  9. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  10. Managing Requirements-Documents to Data

    Science.gov (United States)

    Orr, Kevin; Hudson, Abe

    2017-01-01

    Managing Requirements on long term projects like International Space Station (ISS) can go thru many phases, from initial product development to almost over 20 years of operations and sustainment. Over that time many authorized changes have been made to the requirement set, that apply to any new systems that would visit the ISS today, like commercial cargo/crew vehicles or payloads. Explore the benefits of managing requirements in a database while satisfying traditional documents needs for contracts and stakeholder/user consumption that are not tied into the database.

  11. FAB - Underwater and underground electric connection between France and Great Britain via Aurigny. File of presentation of the project and of its investigation area. Project synthesis. Impact study constituting an incidence document under the Law on Water. Ground brochure + Sea brochure. Non technical summary. Deliberated opinion of the Environmental Authority on the underwater and underground electrical interconnection between France and Great-Britain via Aurigny (FAB)

    International Nuclear Information System (INIS)

    2014-11-01

    This document gathers several reports. The first one indicates the actors involved in the project of electrical interconnection between France and Great-Britain via Aurigny, presents various technical aspects and works of this project, and proposes a definition and a description of the concerned area. The second report proposes a synthetic presentation of the project: agreement process, project interest, project definition and equipment locations, project technical components and aspects, onshore and offshore environmental aspects, project status and planning. The third report analyses the various onshore aspects of the interconnection project: project description, initial situation of the environment, analysis of the project effects on the environment and on health, analysis of cumulated effects with other known projects, sketches of examined substitution solutions and reasons for the selection of the project, elements of analysis of compliance with land uses and various planning documents, measures aimed at avoiding, reducing or compensating project effects, methods to assess initial status and effects, faced difficulties. The fourth report addresses the same issues as the previous one but for offshore aspects. The fifth report is a non technical summarised presentation of the project which presents the French side, describes the elaboration approach, the offshore and onshore legs of the project, an assessment of impacts on Natura 2000 sites. It notably contains several detailed geographical and geological maps to illustrate and to highlight the various environmental, geological, economic, social, urban or landscape impacts. The last document is the detailed opinion of the Environmental Authority on this project. It addresses the context, the project principle, implementation and cost, environmental stakes and challenges, and impacts

  12. Environmental Information Document: L-reactor reactivation

    International Nuclear Information System (INIS)

    Mackey, H.E. Jr.

    1982-04-01

    Purpose of this Environmental Information Document is to provide background for assessing environmental impacts associated with the renovation, restartup, and operation of L Reactor at the Savannah River Plant (SRP). SRP is a major US Department of Energy installation for the production of nuclear materials for national defense. The purpose of the restart of L Reactor is to increase the production of nuclear weapons materials, such as plutonium and tritium, to meet projected needs in the nuclear weapons program

  13. Environmental Information Document: L-reactor reactivation

    Energy Technology Data Exchange (ETDEWEB)

    Mackey, H.E. Jr. (comp.)

    1982-04-01

    Purpose of this Environmental Information Document is to provide background for assessing environmental impacts associated with the renovation, restartup, and operation of L Reactor at the Savannah River Plant (SRP). SRP is a major US Department of Energy installation for the production of nuclear materials for national defense. The purpose of the restart of L Reactor is to increase the production of nuclear weapons materials, such as plutonium and tritium, to meet projected needs in the nuclear weapons program.

  14. Automated Generation of Technical Documentation and Provenance for Reproducible Research

    Science.gov (United States)

    Jolly, B.; Medyckyj-Scott, D.; Spiekermann, R.; Ausseil, A. G.

    2017-12-01

    Data provenance and detailed technical documentation are essential components of high-quality reproducible research, however are often only partially addressed during a research project. Recording and maintaining this information during the course of a project can be a difficult task to get right as it is a time consuming and often boring process for the researchers involved. As a result, provenance records and technical documentation provided alongside research results can be incomplete or may not be completely consistent with the actual processes followed. While providing access to the data and code used by the original researchers goes some way toward enabling reproducibility, this does not count as, or replace, data provenance. Additionally, this can be a poor substitute for good technical documentation and is often more difficult for a third-party to understand - particularly if they do not understand the programming language(s) used. We present and discuss a tool built from the ground up for the production of well-documented and reproducible spatial datasets that are created by applying a series of classification rules to a number of input layers. The internal model of the classification rules required by the tool to process the input data is exploited to also produce technical documentation and provenance records with minimal additional user input. Available provenance records that accompany input datasets are incorporated into those that describe the current process. As a result, each time a new iteration of the analysis is performed the documentation and provenance records are re-generated to provide an accurate description of the exact process followed. The generic nature of this tool, and the lessons learned during its creation, have wider application to other fields where the production of derivative datasets must be done in an open, defensible, and reproducible way.

  15. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  16. Maintaining project consistency with transportation plans throughout the project life cycle with an emphasis on maintaining air quality conformity.

    Science.gov (United States)

    2014-11-01

    This document was developed for transportation professionals responsible for project : development and has three basic goals: : 1. Define project consistency and identify the causes of project inconsistencies and the : critical junctures in the proje...

  17. Beyond a Box of Documents: The Collaborative Partnership Behind the Oregon Chinese Disinterment Documents Collection

    Directory of Open Access Journals (Sweden)

    Natalia M. Fernández

    2013-06-01

    Full Text Available This article is a case study of a collaboration between the Oregon Multicultural Archives of Oregon State University, Portland State University Library's Special Collections, the Chinese Consolidated Benevolent Association (CCBA, and the Northwest News Network to preserve and make accessible a recovered box of Oregon Chinese disinterment documents. By examining what influenced and engaged each partner, this case study offers an opportunity to better understand the motivations of diverse stakeholders in a "post-custodial era" project that challenges traditional practices of custody, control, and access.

  18. The National Library of Kosovo "PJETER Bogdani" Rapid Condition Assessment and Documentation

    Science.gov (United States)

    Eppich, R.; Ramku, B.; Binakaj, N.

    2017-08-01

    The National Library of Kosovo "Pjetër Bogdani" is a symbol of Prishtina, Kosovo and the quest for knowledge. It is simultaneously an icon of modernity and symbol of the past. Unfortunately, it suffered through the Kosovo war and neglect in times of economic difficulty. It was also unfortunately featured in the British newspaper The Telegraph in their travel section: "One of the world's 30 ugliest buildings?" In late 2015 the Kosovo Architectural Foundation, a non-profit dedicated to spirit of creating and preserving unique architecture, became concerned with the reputation and condition of the Library and contacted the Kosovo Ministry of Culture, visited the site and initiated a project to raise awareness and document this modern masterpiece. The Getty Foundation and their Keeping it Modern grant program awarded funding for initial condition assessment, documentation, capacity building and investigations. This paper discusses the project to document and improve the image and awareness of this important structure and set priorities for its future.

  19. Summer Student Report - Project Kryolize

    CERN Document Server

    Drozdowski, Pawel

    2016-01-01

    The purpose of this document is to describe the work and results obtained by the author during his summer student internship at CERN. The author of this document was attached to the project Kryolize as a software developer, overtaking the job from a recently departed technical student.

  20. [Stimulation of labour with oxytocin and ventouse deliveries are inadequately documented].

    Science.gov (United States)

    Lindved, Birgitte Freilev; Kierkegaard, Ole; Anhøj, Jacob

    2014-09-15

    A retrospective sample of 180 records from four regional hospitals and five university hospitals in Denmark was collected and the documentation for use of oxytocin in augmentation of labour and ventouse deliveries according to the national guidelines was registered. Only approximately half of the elements in the national guidelines were documented. This shows that there is a potential for improvement in the ongoing Danish national quality improvement project Safe Deliveries (Sikre Fødsler).

  1. Automated metadata--final project report

    International Nuclear Information System (INIS)

    Schissel, David

    2016-01-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project's toolkit. Feedback was very positive on the project's toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  2. The ZEUS data preservation project

    International Nuclear Information System (INIS)

    Malka, Janusz; Wichmann, Katarzyna

    2012-01-01

    A project to allow long term access and physics analysis of ZEUS data (ZEUS data preservation) has been established in collaboration with the DESY-IT group. In the ZEUS approach the analysis model is based on the Common Ntuple project, under development since 2006. The real data and all presently available Monte Carlo samples are being preserved in a flat ROOT ntuple format. There is ongoing work to provide the ability to simulate new, additional Monte Carlo samples also in the future. The validation framework of such a scheme using virtualisation techniques is being explored. The goal is to validate the frozen ZEUS software against future changes in hardware and operating system. A cooperation between ZEUS, DESY-IT and the library was established for document digitisation and long-term preservation of collaboration web pages. Part of the ZEUS internal documentation has already been stored within the HEP documentation system INSPIRE. Existing digital documentation, needed to perform physics analysis also in the future, is being centralised and completed.

  3. Offset project report : Cleanit Greenit aerobic composting project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-02-15

    The Cleanit Greenit site is owned and operated by Cleanit Greenit Composting System Inc. and is a composting facility located in Edmonton, Alberta. The facility has an annual processing capacity of 20,000 tonnes of organic waste and was the first in Canada to compost a large variety of industrial by-products containing hydrocarbons, through controlled blending with other wastes and monitoring of moisture, temperature and pH. The composting process turns organic waste material from industrial, commercial and domestic sources into finished projects, thus removing these materials from conditions where treatment and disposal is often difficult, expensive and environmentally harmful. This protocol document covered the diversion of organic residues from landfill for biological decomposition to a condition sufficiently stable for nuisance-free storage and for safe use in land application. A wide variety of organic residues were considered, including agricultural and agri-food residues; the organic portion of municipal solid waste; food wastes; and forestry and landscaping wastes. The document presented information on the Cleanit Greenit project and discussed the calculation of greenhouse gas emission reductions. An appendix that contained the Cleanit Greenit aerobic composting offset project plan was also provided. tabs., figs.

  4. Biological Information Document, Radioactive Liquid Waste Treatment Facility

    International Nuclear Information System (INIS)

    Biggs, J.

    1995-01-01

    This document is intended to act as a baseline source material for risk assessments which can be used in Environmental Assessments and Environmental Impact Statements. The current Radioactive Liquid Waste Treatment Facility (RLWTF) does not meet current General Design Criteria for Non-reactor Nuclear Facilities and could be shut down affecting several DOE programs. This Biological Information Document summarizes various biological studies that have been conducted in the vicinity of new Proposed RLWTF site and an Alternative site. The Proposed site is located on Mesita del Buey, a mess top, and the Alternative site is located in Mortandad Canyon. The Proposed Site is devoid of overstory species due to previous disturbance and is dominated by a mixture of grasses, forbs, and scattered low-growing shrubs. Vegetation immediately adjacent to the site is a pinyon-juniper woodland. The Mortandad canyon bottom overstory is dominated by ponderosa pine, willow, and rush. The south-facing slope was dominated by ponderosa pine, mountain mahogany, oak, and muhly. The north-facing slope is dominated by Douglas fir, ponderosa pine, and oak. Studies on wildlife species are limited in the vicinity of the proposed project and further studies will be necessary to accurately identify wildlife populations and to what extent they utilize the project area. Some information is provided on invertebrates, amphibians and reptiles, and small mammals. Additional species information from other nearby locations is discussed in detail. Habitat requirements exist in the project area for one federally threatened wildlife species, the peregrine falcon, and one federal candidate species, the spotted bat. However, based on surveys outside of the project area but in similar habitats, these species are not expected to occur in either the Proposed or Alternative RLWTF sites. Habitat Evaluation Procedures were used to evaluate ecological functioning in the project area

  5. Biological Information Document, Radioactive Liquid Waste Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    Biggs, J.

    1995-12-31

    This document is intended to act as a baseline source material for risk assessments which can be used in Environmental Assessments and Environmental Impact Statements. The current Radioactive Liquid Waste Treatment Facility (RLWTF) does not meet current General Design Criteria for Non-reactor Nuclear Facilities and could be shut down affecting several DOE programs. This Biological Information Document summarizes various biological studies that have been conducted in the vicinity of new Proposed RLWTF site and an Alternative site. The Proposed site is located on Mesita del Buey, a mess top, and the Alternative site is located in Mortandad Canyon. The Proposed Site is devoid of overstory species due to previous disturbance and is dominated by a mixture of grasses, forbs, and scattered low-growing shrubs. Vegetation immediately adjacent to the site is a pinyon-juniper woodland. The Mortandad canyon bottom overstory is dominated by ponderosa pine, willow, and rush. The south-facing slope was dominated by ponderosa pine, mountain mahogany, oak, and muhly. The north-facing slope is dominated by Douglas fir, ponderosa pine, and oak. Studies on wildlife species are limited in the vicinity of the proposed project and further studies will be necessary to accurately identify wildlife populations and to what extent they utilize the project area. Some information is provided on invertebrates, amphibians and reptiles, and small mammals. Additional species information from other nearby locations is discussed in detail. Habitat requirements exist in the project area for one federally threatened wildlife species, the peregrine falcon, and one federal candidate species, the spotted bat. However, based on surveys outside of the project area but in similar habitats, these species are not expected to occur in either the Proposed or Alternative RLWTF sites. Habitat Evaluation Procedures were used to evaluate ecological functioning in the project area.

  6. Document education to the energy; Dossier documentaire education a l'energie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-01-01

    This document proposes a recording of more than one hundred educational tools essential for the realization of a project on the energy education: books, reviews, videotapes, CD-Rom, educational cases. (A.L.B.)

  7. The Chicken and Egg Project

    Science.gov (United States)

    Alkon, Ivette

    2004-01-01

    This article describes a project on chickens and eggs undertaken by 5-year-old children in a bilingual school in Mexico City. It describes the three phases of the project and includes photographs and other documentation of the children's work.

  8. AREVA 2010 Reference document

    International Nuclear Information System (INIS)

    2010-01-01

    After a presentation of the person responsible for this document, and of statutory auditors, this report proposes some selected financial information. Then, it addresses, presents and comments the different risk factors: risk management and coverage, legal risk, industrial and environmental risk, operational risk, risks related to major projects, liquidity and market risk, and other risk. Then, after a presentation of the issuer, it proposes a business overview (markets for nuclear and renewable energies, AREVA customers and suppliers, strategy, activities), a presentation of the organizational structure, a presentation of AREVA properties, plants and equipment (sites, environmental issues), an analysis and comment of the group's financial position and performance, a presentation of its capital resources, an overview of its research and development activities, programs, patents and licenses. It indicates profit forecast and estimates, presents the administrative, management and supervisory bodies, and compensation and benefits amounts, reports of the functioning of corporate bodies. It describes the human resource company policy, indicates the main shareholders and transactions with related parties. It proposes financial information concerning assets, financial positions and financial performance. This document contains its French and its English versions

  9. Functions and requirements document for interim store solidified high-level and transuranic waste

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture, and interfaces.

  10. US heat pump research and development projects, 1976-1986

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, K.H.

    1987-04-01

    This document, which is an updated version of US Heat Pump Research and Development Projects, published in August 1982 by the US Department of Energy, is a compilation of one-page summaries and publication and patent information for 233 individual research and development projects on heat pumps covering the years 1976 through 1986. The majority of the projects refer to heat pumps in space-conditioning applications. The document is intended to include information on all projects in the United States for which results are publicly available. Ten different indexes are included to aid the reader in locating specific projects.

  11. Project Quality Plan

    DEFF Research Database (Denmark)

    Sandborg-Petersen, Ulrik; Øhrstrøm, Peter

    This document defines the procedures, standards, and strategies which will be used to ensure high standards of quality of the work produced within the HANDS project. It contains the following sections...

  12. The Apollo experiment for document delivery via satellite communication

    Science.gov (United States)

    1985-03-01

    Dutch participation possibilities in the Apollo document delivery project, wishes and idea's of potential user and tender groups, and plans and activities of Dutch institutes and companies, are surveyed. The Apollo storage and transport system, demand and administration network, potential markets, and subject areas of the documents are investigated. Utilization areas (scientific, technical, administration, and business information) are listed. High tariffs and the lack of necessary provision make a direct participation strategy impossible. However, in the experimental phase, Dutch companies must be allowed to contribute in technical developments and availability of organizational and technical facilities must be stimulated.

  13. Computer Assets Recovery Project

    Science.gov (United States)

    CortesPena, Aida Yoguely

    2010-01-01

    This document reports on the project that was performed during the internship of the author. The project involved locating and recovering machines in various locations that Boeing has no need for, and therefore requires that they be transferred to another user or transferred to a non-profit organization. Other projects that the author performed was an inventory of toner and printers, loading new computers and connecting them to the network.

  14. Regulatory guidance document

    International Nuclear Information System (INIS)

    1994-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Program Management System Manual requires preparation of the OCRWM Regulatory Guidance Document (RGD) that addresses licensing, environmental compliance, and safety and health compliance. The document provides: regulatory compliance policy; guidance to OCRWM organizational elements to ensure a consistent approach when complying with regulatory requirements; strategies to achieve policy objectives; organizational responsibilities for regulatory compliance; guidance with regard to Program compliance oversight; and guidance on the contents of a project-level Regulatory Compliance Plan. The scope of the RGD includes site suitability evaluation, licensing, environmental compliance, and safety and health compliance, in accordance with the direction provided by Section 4.6.3 of the PMS Manual. Site suitability evaluation and regulatory compliance during site characterization are significant activities, particularly with regard to the YW MSA. OCRWM's evaluation of whether the Yucca Mountain site is suitable for repository development must precede its submittal of a license application to the Nuclear Regulatory Commission (NRC). Accordingly, site suitability evaluation is discussed in Chapter 4, and the general statements of policy regarding site suitability evaluation are discussed in Section 2.1. Although much of the data and analyses may initially be similar, the licensing process is discussed separately in Chapter 5. Environmental compliance is discussed in Chapter 6. Safety and Health compliance is discussed in Chapter 7

  15. Perspectives on Linguistic Documentation from Sociolinguistic Research on Dialects

    Science.gov (United States)

    Tagliamonte, Sali A.

    2017-01-01

    The goal of the paper is to demonstrate how sociolinguistic research can be applied to endangered language documentation field linguistics. It first provides an overview of the techniques and practices of sociolinguistic fieldwork and the ensuring corpus compilation methods. The discussion is framed with examples from research projects focused on…

  16. Document status for 1 and 2 Kozloduy NPP decommissioning activities -Phase 'Final Shutdown'

    International Nuclear Information System (INIS)

    Vangev, A.; Boyadjiev, Z.

    1997-01-01

    Decommissioning process (D and D) is the final phase of each nuclear reactor life cycle. The first nuclear reactor generation has reached his expiration life date. Decommissioning working documentation had not been taken into account at the project and construction stage. The decommissioning activities, planning and legislation has to develop along their operation. Most of developed nuclear energetic countries have gathered good experience and have create their own decommissioning strategy. This report represents in brief an overview of different country's approaches and the Kozloduy NPP decommissioning activity intention in near future and reviews the D and D working document status for 1 and 2 Kozloduy NPP Units decommissioning. Kozloduy NPP D and D task to the moment is to plan the first stage of the decommissioning process - 'The Final Shutdown' and to prepare the working documents for the phase execution. The Final Shutdown of Kozloduy NPP - 1 is the termination of operation of the Units 1 and 2 and the electricity production cessation after their useful life exhaust. In accordance with the legal legislation in Bulgaria only the normal planned termination of operation on units 1 and 2 should be prescribed. The project results concern the initial condition of the equipment and systems, their preparation and sequence for defueling, decontamination and dismantling. A plan for activities' organization for D and D and Complex Characterization of the Site under consideration will contain the following documents: 1. Time-schedule for the sequence of activities during the stages of the Final Shutdown and Safe Enclosure preparation. Technical project for organization of work related to Final Shutdown; 2. Complex Characterization Programme for a condition investigation of the Units 1 and 2 equipment and systems. 3. Technical project for design modifications and dismantling of equipment and systems which violate the radiation and nuclear safety during the Final Shutdown

  17. Enhancing Documentation of Pressure Ulcer Prevention Interventions: A Quality Improvement Strategy to Reduce Pressure Ulcers.

    Science.gov (United States)

    Jacobson, Therese M; Thompson, Susan L; Halvorson, Anna M; Zeitler, Kristine

    2016-01-01

    Prevention of hospital-acquired pressure ulcers requires the implementation of evidence-based interventions. A quality improvement project was conducted to provide nurses with data on the frequency with which pressure ulcer prevention interventions were performed as measured by documentation. Documentation reports provided feedback to stakeholders, triggering reminders and reeducation. Intervention reports and modifications to the documentation system were effective both in increasing the documentation of pressure ulcer prevention interventions and in decreasing the number of avoidable hospital-acquired pressure ulcers.

  18. Design criteria document, electrical system, K-Basin essential systems recovery, Project W-405

    International Nuclear Information System (INIS)

    Hoyle, J.R.

    1994-01-01

    This Design Criteria Document provides the criteria for design and construction of electrical system modifications for 100K Area that are essential to protect the safe operation and storage of spent nuclear fuel in the K-Basin facilities

  19. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  20. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  1. webinos project deliverable: Phase 1 Security Framework

    OpenAIRE

    webinos consortium

    2011-01-01

    The webinos project aims to deliver a cross-device web application runtime environment, providing a unified development platform and standardized inter-device communication and interaction. This document contains the first iteration of the technical security and privacy framework designed for the webinos project. It accompanies two other documents - D3.1 System Specification and D3.2 API Specifications - and refers to concepts developed in them. The security and privacy architecture aims to p...

  2. Soil Moisture Active Passive (SMAP) Mission Level 4 Carbon (L4_C) Product Specification Document

    Science.gov (United States)

    Glassy, Joe; Kimball, John S.; Jones, Lucas; Reichle, Rolf H.; Ardizzone, Joseph V.; Kim, Gi-Kong; Lucchesi, Robert A.; Smith, Edmond B.; Weiss, Barry H.

    2015-01-01

    This is the Product Specification Document (PSD) for Level 4 Surface and Root Zone Soil Moisture (L4_SM) data for the Science Data System (SDS) of the Soil Moisture Active Passive (SMAP) project. The L4_SM data product provides estimates of land surface conditions based on the assimilation of SMAP observations into a customized version of the NASA Goddard Earth Observing System, Version 5 (GEOS-5) land data assimilation system (LDAS). This document applies to any standard L4_SM data product generated by the SMAP Project.

  3. Microwave solidification project overview

    Energy Technology Data Exchange (ETDEWEB)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  4. Microwave solidification project overview

    International Nuclear Information System (INIS)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included

  5. Preliminary application of Structure from Motion and GIS to document decomposition and taphonomic processes.

    Science.gov (United States)

    Carlton, Connor D; Mitchell, Samantha; Lewis, Patrick

    2018-01-01

    Over the past decade, Structure from Motion (SfM) has increasingly been used as a means of digital preservation and for documenting archaeological excavations, architecture, and cultural material. However, few studies have tapped the potential of using SfM to document and analyze taphonomic processes affecting burials for forensic sciences purposes. This project utilizes SfM models to elucidate specific post-depositional events that affected a series of three human cadavers deposited at the South East Texas Applied Forensic Science Facility (STAFS). The aim of this research was to test the ability for untrained researchers to employ spatial software and photogrammetry for data collection purposes. For a series of three months a single lens reflex (SLR) camera was used to capture a series of overlapping images at periodic stages in the decomposition process of each cadaver. These images are processed through photogrammetric software that creates a 3D model that can be measured, manipulated, and viewed. This project used photogrammetric and geospatial software to map changes in decomposition and movement of the body from original deposition points. Project results indicate SfM and GIS as a useful tool for documenting decomposition and taphonomic processes. Results indicate photogrammetry is an efficient, relatively simple, and affordable tool for the documentation of decomposition. Copyright © 2017 Elsevier B.V. All rights reserved.

  6. ONR BAA 06-007 Concept of Operations Document. Version 1.1

    National Research Council Canada - National Science Library

    Winslow, Sid; Kane, Clayton; Abdelhameid, Adam

    2007-01-01

    ...- Navigation in a GPS Denied Environment phase I project activities. The contents of this document were derived from the original BAA content, FAQs, review of USMC field manuals and design modifications of the current TrakPoint application...

  7. KNOWLEDGE AND VALORIZATION OF HISTORICAL SITES THROUGH 3D DOCUMENTATION AND MODELING

    Directory of Open Access Journals (Sweden)

    E. Farella

    2016-06-01

    Full Text Available The paper presents the first results of an interdisciplinary project related to the 3D documentation, dissemination, valorization and digital access of archeological sites. Beside the mere 3D documentation aim, the project has two goals: (i to easily explore and share via web references and results of the interdisciplinary work, including the interpretative process and the final reconstruction of the remains; (ii to promote and valorize archaeological areas using reality-based 3D data and Virtual Reality devices. This method has been verified on the ruins of the archeological site of Pausilypon, a maritime villa of Roman period (Naples, Italy. Using Unity3D, the virtual tour of the heritage site was integrated and enriched with the surveyed 3D data, text documents, CAAD reconstruction hypotheses, drawings, photos, etc. In this way, starting from the actual appearance of the ruins (panoramic images, passing through the 3D digital surveying models and several other historical information, the user is able to access virtual contents and reconstructed scenarios, all in a single virtual, interactive and immersive environment. These contents and scenarios allow to derive documentation and geometrical information, understand the site, perform analyses, see interpretative processes, communicate historical information and valorize the heritage location.

  8. Role of Interdisciplinary Cooperation in Process of Documentation of Cultural Heritage

    Directory of Open Access Journals (Sweden)

    Jindřich Hodač

    2011-12-01

    Full Text Available This paper is focused on presentation of results of long-term interdisciplinary cooperation in a process of documentation of Cultural Heritage. There are two sides joined in this cooperation. The first side is a ,,submitter” - in our case it means architect-historian (Mr. Rykl. The second side is a ,,contractor” - in our case it means surveyorphotogrammetrist (Mr. Hodač and his students. We are cooperating mostly on projects of metrical documentation of Culture Heritage buildings and sites. Our cooperation is realizing mainly in bachelor„s/master’s projects. Other opportunity for our collaboration is our course [1]. We are offering this course to students of two faculties/specializations (surveyors + architects. Beside the wide range of real results (2D drawings, 3D models, photomaps etc. we also collected quite a lot of experience with process of collaboration itself. Cooperation and communication of submitter and contactor are playing key roles for successful project. It is possible to generally expect that submitter will give the ,,task” and contractor will try to find proper technology to solve it. The process of communication should be permanent because new circumstances and findings are arising all the time. It is very important for all together to find common language across specializations to understand each other. Surveyors are ,,slightly pressed” to get more knowledge about historical building constructions. Architects-historians should get basic awareness about various recent technologies for metrical documentation and its ,,pros and cons”.

  9. Experimental conditions and monitoring items of the prototype repository project (PRP). Research document

    International Nuclear Information System (INIS)

    Sugita, Yutaka; Ito, Akira; Kawakami, Susumu

    2003-03-01

    Various experiments are ongoing in the underground research facility 'the Hard Rock Laboratory (HRL)' of SKB in Sweden for the geological disposal of the high-level radioactive waste. International joint project Prototype Repository Project (PRP) is one of the experiments in the HRL which has some engineered barrier systems and to study the coupled behavior happening in and around the engineered barrier system. JNC has joined this international joint project PRP to obtain the information of the coupled behavior on such systematic engineered barrier system and to apply the JNC's coupled THMC analytical code to the prediction and back analysis of the PRP. The analytical code will be verified through these analyses in this project. JNC can apply the verified analytical code to assess the coupled behavior in Japan. This report summarizes the experimental conditions and monitoring items of the PRP. (author)

  10. 50 CFR 253.22 - State projects.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false State projects. 253.22 Section 253.22... State projects. (a) General—(1) Designation of state agency. The Governor of each state shall notify the... participation under the Act, to sign project documents, and to receive payments. (2) States that choose to...

  11. Solid Waste Projection Model: Database (Version 1.4)

    International Nuclear Information System (INIS)

    Blackburn, C.; Cillan, T.

    1993-09-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford Company (WHC). The SWPM system provides a modeling and analysis environment that supports decisions in the process of evaluating various solid waste management alternatives. This document, one of a series describing the SWPM system, contains detailed information regarding the software and data structures utilized in developing the SWPM Version 1.4 Database. This document is intended for use by experienced database specialists and supports database maintenance, utility development, and database enhancement. Those interested in using the SWPM database should refer to the SWPM Database User's Guide. This document is available from the PNL Task M Project Manager (D. L. Stiles, 509-372-4358), the PNL Task L Project Manager (L. L. Armacost, 509-372-4304), the WHC Restoration Projects Section Manager (509-372-1443), or the WHC Waste Characterization Manager (509-372-1193)

  12. Automated metadata--final project report

    Energy Technology Data Exchange (ETDEWEB)

    Schissel, David [General Atomics, San Diego, CA (United States)

    2016-04-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  13. Technical Basis Document for Internal Dosimetry at Sandia National Laboratories Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Potter, Charles A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-09-01

    The RPID Project is implemented at all SNL facilities for activities involving the processing and/or storing of radioactive materials. Reference to SNL throughout this document includes all SNL facilities and activities.

  14. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  15. SNF Project Engineering Process Improvement Plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    2000-01-01

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities

  16. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  17. Design and Construction Documents Associated with N232, Sustainability Base

    Science.gov (United States)

    Zornetzer, Steven F.; Schuler, Raymond F.; Grymes, Rosalind A.

    2014-01-01

    This request comprehensively covers documents associated with the design and construction of Sustainability Base, N232. The intent of this project specifically envisioned broad dissemination of these materials to others undertaking the design and construction of high-performing energy- and resource-efficient buildings in comparable climate zones.

  18. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  19. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  20. A graded approach to safety documentation at processing facilities

    International Nuclear Information System (INIS)

    Cowen, M.L.

    1992-01-01

    Westinghouse Savannah River Company (WSRC) has over 40 major Safety Analysis Reports (SARs) in preparation for non-reactor facilities. These facilities include nuclear material production facilities, waste management facilities, support laboratories and environmental remediation facilities. The SARs for these various projects encompass hazard levels from High to Low, and mission times from startup, through operation, to shutdown. All of these efforts are competing for scarce resources, and therefore some mechanism is required for balancing the documentation requirements. Three of the key variables useful for the decision making process are Depth of Safety Analysis, Urgency of Safety Analysis, and Resource Availability. This report discusses safety documentation at processing facilities

  1. Spent nuclear fuel project technical databook

    Energy Technology Data Exchange (ETDEWEB)

    Reilly, M.A.

    1998-07-22

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values.

  2. Spent nuclear fuel project technical databook

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1998-01-01

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values

  3. Canada: Darlington NPP. Project Control. Annex 4

    International Nuclear Information System (INIS)

    Wieckowski, G.

    1999-01-01

    This annex deals with project control. The just slowed down and delayed. Senior engineering, construction and procurement staff stayed with the project. Documentation was preserved though normal functioning of the records department project was completed and put into service with a few years' delay. (author)

  4. Risk D and D Rapid Prototype: Scenario Documentation and Analysis Tool

    International Nuclear Information System (INIS)

    Unwin, Stephen D.; Seiple, Timothy E.

    2009-01-01

    Report describes process and methodology associated with a rapid prototype tool for integrating project risk analysis and health and safety risk analysis for decontamination and decommissioning projects. The objective of the Decontamination and Decommissioning (D and D) Risk Management Evaluation and Work Sequencing Standardization Project under DOE EM-23 is to recommend or develop practical risk-management tools for decommissioning of nuclear facilities. PNNL has responsibility under this project for recommending or developing computer-based tools that facilitate the evaluation of risks in order to optimize the sequencing of D and D work. PNNL's approach is to adapt, augment, and integrate existing resources rather than to develop a new suite of tools. Methods for the evaluation of H and S risks associated with work in potentially hazardous environments are well-established. Several approaches exist which, collectively, are referred to as process hazard analysis (PHA). A PHA generally involves the systematic identification of accidents, exposures, and other adverse events associated with a given process or work flow. This identification process is usually achieved in a brainstorming environment or by other means of eliciting informed opinion. The likelihoods of adverse events (scenarios) and their associated consequence severities are estimated against pre-defined scales, based on which risk indices are then calculated. A similar process is encoded in various project risk software products that facilitate the quantification of schedule and cost risks associated with adverse scenarios. However, risk models do not generally capture both project risk and H and S risk. The intent of the project reported here is to produce a tool that facilitates the elicitation, characterization, and documentation of both project risk and H and S risk based on defined sequences of D and D activities. By considering alternative D and D sequences, comparison of the predicted risks can

  5. REVEAL: Software Documentation and Platform Migration

    Science.gov (United States)

    Wilson, Michael A.; Veibell, Victoir T.; Freudinger, Lawrence C.

    2008-01-01

    The Research Environment for Vehicle Embedded Analysis on Linux (REVEAL) is reconfigurable data acquisition software designed for network-distributed test and measurement applications. In development since 2001, it has been successfully demonstrated in support of a number of actual missions within NASA s Suborbital Science Program. Improvements to software configuration control were needed to properly support both an ongoing transition to operational status and continued evolution of REVEAL capabilities. For this reason the project described in this report targets REVEAL software source documentation and deployment of the software on a small set of hardware platforms different from what is currently used in the baseline system implementation. This report specifically describes the actions taken over a ten week period by two undergraduate student interns and serves as a final report for that internship. The topics discussed include: the documentation of REVEAL source code; the migration of REVEAL to other platforms; and an end-to-end field test that successfully validates the efforts.

  6. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    International Nuclear Information System (INIS)

    ROOT, R.W.

    1999-01-01

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems

  7. Large-scale dam removal in the northeast United States: documenting ecological responses to the Penobscot River Restoration Project

    Science.gov (United States)

    Collins, M. J.; Aponte Clarke, G.; Baeder, C.; McCaw, D.; Royte, J.; Saunders, R.; Sheehan, T.

    2012-12-01

    The Penobscot River Restoration Project aims to improve aquatic connectivity in New England's second largest watershed ( 22,000 km2) by removing the two lowermost, mainstem dams and bypassing a third dam on a principal tributary upstream. Project objectives include: restoring unobstructed access to the entire historic riverine range for five lower river diadromous species including Atlantic and shortnose sturgeon; significantly improving access to upstream habitat for six upper river diadromous species including Atlantic salmon; reconnecting trophic linkages between headwater areas and the Gulf of Maine; restoring fluvial processes to the former impoundments; improving recreational and Penobscot Nation cultural opportunities; and maintaining basin-wide hydropower output. The project is expected to have landscape-scale benefits and the need for a significant investment in long-term monitoring and evaluation to formally quantify ecosystem response has been recognized. A diverse group of federal, state, tribal, NGO, and academic partners has developed a long-term monitoring and evaluation program composed of nine studies that began in 2009. Including American Recovery and Reinvestment Act (ARRA) funding that leveraged partner contributions, we have invested nearly $2M to date in pre- and post-removal investigations that evaluate geomorphology/bed sediment, water quality, wetlands, and fisheries. Given the number of affected diadromous species and the diversity of their life histories, we have initiated six distinct, but related, fisheries investigations to document these expected changes: Atlantic salmon upstream and downstream passage efficiency using passive integrated transponder (PIT) and acoustic telemetry; fish community structure via an index of biotic integrity (IBI); total diadromous fish biomass through hydroacoustics; shortnose sturgeon spawning and habitat use via active and passive acoustic telemetry; and freshwater-marine food web interactions by

  8. Document education to the energy; Dossier documentaire education a l'energie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-01-01

    This document proposes a recording of more than one hundred educational tools essential for the realization of a project on the energy education: books, reviews, videotapes, CD-Rom, educational cases. (A.L.B.)

  9. NASAwide electronic publishing system-prototype STI electronic document distribution: Stage-4 evaluation report. Part 2; Appendices

    Science.gov (United States)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual framework, functional description, and technical report server of the Scientific and Technical Information (STI) Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware. and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices consist of (A) the STI EDD Project Plan, (B) Team members, (C) Phasing Schedules, (D) Accessing On-line Reports, and (E) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desk top publishing systems, and technical report servers, to be able to provide to NASA's engineers, researchers, scientists, and external users, the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  10. Chapter 3: Design of the Saber-Tooth Project.

    Science.gov (United States)

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  11. Transition plan: Project C-018H, 200-E Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    Connor, M.D.

    1994-01-01

    The purpose of this transition plan is to ensure an orderly transfer of project information to operations to satisfy Westinghouse Hanford Company (WHC) operational requirements and objectives, and ensure safe and efficient operation of Project C-018H, the 200-E Area Effluent Treatment Facility (ETF). This plan identifies the deliverables for Project C-018H upon completion of construction and turnover to WHC for operations, and includes acceptance criteria to objectively assess the adequacy of the contract deliverables in relation to present requirements. The scope of this plan includes a general discussion of the need for complete and accurate design basis documentation and design documents as project deliverables. This plan also proposes that a configuration management plan be prepared to protect and control the transferred design documents and reconstitute the design basis and design requirements, in the event that the deliverables and project documentation received from the contractor are less than adequate at turnover

  12. Workplace Literacy Pilot Projects: A Discussion Paper = Les Projects-pilotes en alphabetisation en milieu de travail: document de discussion.

    Science.gov (United States)

    de Wolff, Alice

    From 1995-1998, 12 of the 79 organizations funded by Canada's National Literacy Secretariat (NLS) conducted approximately 40 workplace literacy pilot projects across Canada. Those projects were reviewed to determine their effectiveness in increasing the number and quality of Canadian workplace literacy programs. Information for the review was…

  13. Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements

    International Nuclear Information System (INIS)

    KLEM, M.J.

    2000-01-01

    In 1998, a major change in the technical strategy for managing Multi Canister Overpacks (MCO) while stored within the Canister Storage Building (CSB) occurred. The technical strategy is documented in Baseline Change Request (BCR) No. SNF-98-006, Simplified SNF Project Baseline (MCO Sealing) (FDH 1998). This BCR deleted the hot conditioning process initially adopted for the Spent Nuclear Fuel Project (SNF Project) as documented in WHC-SD-SNF-SP-005, Integrated Process Strategy for K Basins Spent Nuclear Fuel (WHC 199.5). In summary, MCOs containing Spent Nuclear Fuel (SNF) from K Basins would be placed in interim storage following processing through the Cold Vacuum Drying (CVD) facility. With this change, the needs for the Hot Conditioning System (HCS) and inerting/pressure retaining capabilities of the CSB storage tubes and the MCO Handling Machine (MHM) were eliminated. Mechanical seals will be used on the MCOs prior to transport to the CSB. Covers will be welded on the MCOs for the final seal at the CSB. Approval of BCR No. SNF-98-006, imposed the need to review and update the CSB functions and requirements baseline documented herein including changing the document title to ''Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements.'' This revision aligns the functions and requirements baseline with the CSB Simplified SNF Project Baseline (MCO Sealing). This document represents the Canister Storage Building (CSB) Subproject technical baseline. It establishes the functions and requirements baseline for the implementation of the CSB Subproject. The document is organized in eight sections. Sections 1.0 Introduction and 2.0 Overview provide brief introductions to the document and the CSB Subproject. Sections 3.0 Functions, 4.0 Requirements, 5.0 Architecture, and 6.0 Interfaces provide the data described by their titles. Section 7.0 Glossary lists the acronyms and defines the terms used in this document. Section 8.0 References lists the

  14. Basic Project Management Methodologies for Survey Researchers.

    Science.gov (United States)

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  15. The Environmental Data Exchange Network for Inland Water (EDEN-IW) Project

    DEFF Research Database (Denmark)

    Stjernholm, M.; Zuo, L.; Poslad, S.

    The report documents the development of the ontology system for the EDEN-IW project including the API that interface to the ontology......The report documents the development of the ontology system for the EDEN-IW project including the API that interface to the ontology...

  16. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  17. INFORMATION SYSTEM OF AUTOMATION OF PREPARATION EDUCATIONAL PROCESS DOCUMENTS

    Directory of Open Access Journals (Sweden)

    V. A. Matyushenko

    2016-01-01

    Full Text Available Information technology is rapidly conquering the world, permeating all spheres of human activity. Education is not an exception. An important direction of information of education is the development of university management systems. Modern information systems improve and facilitate the management of all types of activities of the institution. The purpose of this paper is development of system, which allows automating process of formation of accounting documents. The article describes the problem of preparation of the educational process documents. Decided to project and create the information system in Microsoft Access environment. The result is four types of reports obtained by using the developed system. The use of this system now allows you to automate the process and reduce the effort required to prepare accounting documents. All reports was implement in Microsoft Excel software product and can be used for further analysis and processing.

  18. Model documentation report: Macroeconomic Activity Module (MAM) of the National Energy Modeling System

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    This report documents the objectives, analytical approach, and development of the National Energy Modeling System (NEMS) Macroeconomic Activity Module (MAM) used to develop the Annual Energy Outlook for 1997 (AEO 97). The report catalogues and describes the module assumptions, computations, methodology, parameter estimation techniques, and mainframe source code. This document serves three purposes. First it is a reference document providing a detailed description of the NEMS MAM used for the AEO 1997 production runs for model analysts, users, and the public. Second, this report meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its models. Third, it facilitates continuity in model development by providing documentation from which energy analysts can undertake model enhancements, data updates, and parameter refinements as future projects.

  19.  Project Management as a Global Trend for Organization Work

    DEFF Research Database (Denmark)

    Kampf, Constance

    in multination and global companies, understanding the power of visual rhetoric, genre and writing processes in the context of project management documentation can be an advantage for technical communicators.  In addition, project management tools and online documentation spaces are objects which cross...... Project Management as a Global Trend for Organization Work: Implications for Technical Communication Project Management tools and processes offer a visual approach to producing knowledge about a project in order to complete it.  As project management practices are used with increasing frequency......-cultural teams use to function.  This presentation will explore the potential of Project Management to be tightly integrated in Technical Communication curricula through a communications approach to project management.  Questions for discussion include: How tightly is project management integrated into different...

  20. NRC review of Electric Power Research Institute's Advanced Light Reactor Utility Requirements Document - Program summary, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 1 of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Program Summary,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER provides a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  1. DOE Robotics Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This document provide the bimonthly progress reports on the Department of Energy (DOE) Robotics Project by the University of Michigan. Reports are provided for the time periods of December 90/January 91 through June 91/July 91. (FI)

  2. Nevada Nuclear Waste Storage Investigations. FY 1979 project plan

    International Nuclear Information System (INIS)

    1979-03-01

    This document presents the management and cost for the Nevada Nuclear Waste Storage Investigations (disposal of high-level wastes at Nevada Test Site) and provides a complete description of the overall project, management structure, technical approach, and work breakdown structure. The document is organized into five major sections. Section I summarizes the history of the project and indicates a potential future course of action. FY 1979 project work is briefly described in Section II. Section III outlines the delegated responsibilities of all project management functions. A list of critical questions that guide the technical approach of the project are presented in Section IV. Section V contains subtask work plans which outline the work in detail for this fiscal year

  3. The One-Page Project Manager Comunicate and Manage Any Project With a Single Sheet of Paper

    CERN Document Server

    Campbell, Clark A

    2007-01-01

    The One-Page Project Manager shows you how to boil down any project into a simple, one-page document that can be used to communicate all essential details to upper management, other departments, suppliers, and audiences. This practical guide will save time and effort, helping you identify the vital parts of a project and communicate those parts and duties to other team members.

  4. Women of the Manhattan Project

    Science.gov (United States)

    Marshall, Jill

    2009-10-01

    In the book Their Day in the Sun, Ruth Howes and Caroline Herzenberg documented more than 1000 women who worked on the Manhattan Project, preserving their legacy for generations to come. At the 2009 Chicago meeting, the AAPT Committee on Women in Physics celebrated the accomplishments of these women and the men who worked beside them. Howes presented an overview of the contributions of women to the development of the first nuclear weapon, and the session was honored with talks from two Manhattan project veterans, Ellen Cleminshaw Weaver, who worked at Oak Ridge, and Dorothy Marcus Gans, who worked as a technician in the Metallurgical Laboratory in Chicago. I will present a summary of the session, analyzing the effect of working on the project on the career trajectories of the women involved, and point listeners toward additional documentation of this history.

  5. Geothermal Energy Research and Development Program; Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1994-03-01

    This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005

  6. Project W-320, tank 241-C-106 sluicing acceptance for beneficial use

    International Nuclear Information System (INIS)

    BAILEY, J.W.

    1999-01-01

    The purpose of this document is to identify the Project W-320 Chiller Documentation required to be turned over from the Projects Organization to Tank Farm Operations as part of the acceptance of the new equipment for beneficial use

  7. 7 CFR 3560.102 - Housing project management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant documents...

  8. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope

  9. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  10. Bats and bat habitats : guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-03-01

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  11. Bats and bat habitats : guidelines for wind power projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  12. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  13. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  14. AVST Morphing Project Research Summaries in Fiscal Year 2001

    Science.gov (United States)

    McGowan, Anna-Maria R.

    2002-01-01

    The Morphing project at the National Aeronautics and Space Agency's Langley Research Center is part of the Aerospace Vehicle Systems Program Office that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing project are to develop and assess advanced technologies and integrated component concepts to enable efficient, multi-point adaptability in air and space vehicles. In the context of the project, the word "morphing" is defined as "efficient, multi-point adaptability" and may include micro or macro, structural or fluidic approaches. The current document on the Morphing project is a compilation of research summaries and other information on the project from fiscal year 2001. The focus of this document is to provide a brief overview of the project content, technical results and lessons learned from fiscal year 2001.

  15. Accelerated Innovation Deployment (AID) Demonstration Project : Intelligent Compaction and Infrared Scanning Projects

    Science.gov (United States)

    2018-02-01

    This report documents the Missouri Department of Transportation (MoDOT) demonstration grant award for field demonstration projects using intelligent compaction (IC) and infrared scanning (IR) (also called paver-mounted thermal profiles PMTP in the AA...

  16. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    International Nuclear Information System (INIS)

    J. T. Beck

    2007-01-01

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities

  17. Fiscal year 1997-1998 waste information requirements document

    International Nuclear Information System (INIS)

    Poppiti, J.A.

    1997-01-01

    The Waste Information Requirements Document describes the activities of the Tank Waste Remediation System (TWRS) Characterization Project that provide characterization information on Hanford Site waste tanks. The characterization information is required to perform operations and meet the commitments of TWRS end users. These commitments are derived from the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement; the Recommendation 93-5 Implementation Plan to the Defense Nuclear Facilities Safety Board (DNFSB); and other directives as listed in Section 4.0. This Waste Information Requirement Document applies to Fiscal Years 1997 and 1998 activities. Its contents are based on the best information available in August 1997. The format and content are based on the directions of DOE-RL (Sieracki, 1997) and Fluor Daniel Hanford Incorporated (Umek, 1997). Activities, such as the revision of the Tank Characterization Technical Sampling Basis (Brown et al. 1997), the revision of the data quality objectives (DQOs), issue closures, discussions with Ecology, and management decisions may cause subsequent updates to the Waste Information Requirements Document

  18. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  19. Guidance document to the BC emission offsets regulation

    International Nuclear Information System (INIS)

    2010-11-01

    British Columbia's (BC) emission offset regulations were established under the Greenhouse Gas Reduction Targets Act passed in 2007. Targets for greenhouse gas (GHG) emission reductions included a 6 percent reduction by 2012; an 18 percent reduction by 2016; a 33 percent reduction by 2020; and an 80 percent reduction by 2050. Carbon neutral agreements began in 2008, and covered emissions produced from government business travel and by provincial government ministries and agencies. This report presented a list of key recommendations developed by the Pacific Carbon Trust for use in future carbon offset projects. Recommendations included the use of correct emission factors when quantifying projected emission reductions from an offset project; the use of a robust data management system; and the use of evidence in supporting additionality arguments. The document outlined planning procedures for project baseline selection processes, protocol selections, and the identification of sources sinks and reservoirs. Issues related to quantification and measurements, emissions factors, and accuracy and uncertainty were also addressed. Validation, verification, and contracting options were also presented. 6 tabs., 3 figs.

  20. Project W-320, backup: 1000 CFM portable exhausters acceptance for beneficial use

    International Nuclear Information System (INIS)

    Nelson, O.D.

    1998-01-01

    This document is to identify the Project W-320 1000 CFM portable exhauster documentation required to be turned over from the Projects Organization to the Tank Farm Operations as part of the acceptance of the 1000 CFM portable exhausters for beneficial use

  1. River Corridor Project Workplace Air Monitoring Technical Basis

    International Nuclear Information System (INIS)

    MANTOOTH, D.S.

    2001-01-01

    This document provides the technical basis by which the workplace air monitoring and sampling program is operated in the River Corridor Project (RCP). Revision 2 addresses and incorporates changes in the air monitoring program drivers and implementing documents which occurred after the previous revision was issued. This revision also includes an additional RCP project to make Revision 2 applicable to the entire RCP. These changes occurred in the following areas: (1) Changes resulting from the conversion of the Hanford Site Radiological Control Manual (HSRCM-1) into the Project Hanford Radiological Control Manual (F-5173). HNF-5173 is now the implementing document for 10CFR835. (2) Changes resulting from the issue of new and revised Hanford Site implementing procedures. (3) Changes resulting from the issue of new and revised, as well as the cancellation of RCP implementing procedures. (4) Addition of the 200 Area Accelerated Deactivation Project (ADP). (5) Modification of some air sampling/monitoring locations to better meet the needs of facility operations. (6) Changes resulting from the RCP reorganization

  2. IAEA Nuclear Security Assessment Methodologies (NUSAM) Project for Regulated Facilities

    International Nuclear Information System (INIS)

    Jang, Sung Soon

    2016-01-01

    Nuclear Security Assessment Methodologies (NUSAM) is a coordinate research project. The objectives of the NUSAM project is to establish a risk informed, performance-based methodological framework in a systematic, structured, comprehensive and appropriately transparent manner; to provide an environment for the sharing and transfer of knowledge and experience; and to provide guidance on, and practical examples of good practices in assessing the security of nuclear and other radioactive materials, as well as associated facilities and activities. The author worked as an IAEA scientific secretary of the NUAM project from 2013 to 2015. IAEA launched this project in 2013 and performed many activities: meetings, document development, table-top exercises and computer simulations. Now the project is in the final stage and will be concluded in the late 2016. The project will produce documents on NUSAM assessment methods and case study documents on NPP, Irradiator Facility and Transport. South Korea as a main contributor to this project will get benefits from the NUSAM. In 2014, South Korea introduced force-on-force exercises, which could be used as the assessment of physical protection system by the methods of NUSAM

  3. IAEA Nuclear Security Assessment Methodologies (NUSAM) Project for Regulated Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Sung Soon [Korea Nuclear Non-proliferation and Control, Daejeon (Korea, Republic of)

    2016-05-15

    Nuclear Security Assessment Methodologies (NUSAM) is a coordinate research project. The objectives of the NUSAM project is to establish a risk informed, performance-based methodological framework in a systematic, structured, comprehensive and appropriately transparent manner; to provide an environment for the sharing and transfer of knowledge and experience; and to provide guidance on, and practical examples of good practices in assessing the security of nuclear and other radioactive materials, as well as associated facilities and activities. The author worked as an IAEA scientific secretary of the NUAM project from 2013 to 2015. IAEA launched this project in 2013 and performed many activities: meetings, document development, table-top exercises and computer simulations. Now the project is in the final stage and will be concluded in the late 2016. The project will produce documents on NUSAM assessment methods and case study documents on NPP, Irradiator Facility and Transport. South Korea as a main contributor to this project will get benefits from the NUSAM. In 2014, South Korea introduced force-on-force exercises, which could be used as the assessment of physical protection system by the methods of NUSAM.

  4. Midstream streamlining: crude-oil document exchange would be faster with fewer errors

    Energy Technology Data Exchange (ETDEWEB)

    Roche, P.

    2001-11-01

    WellPoint Systems, a Calgary-based oil and gas software firm has designed an Internet-based crude-oil document exchange system, dubbed CDOX, that would see battery operators filling out production forecast forms on the systems they are using now, but instead of faxing the form to pipeline and terminal operators the operator could automatically transmit data over the Internet to the intended companies' computers. Unlike e-mail, the information would be put in place at the receiving end without human intervention. At the heart of the system is a digital hub that securely routes documents from one system to another. Each participating company only has to keep its own profile information up to date, instead of managing hundreds of customer e-mail addresses. The system would run on software provided by webMethods Inc., a Fairfax, Virginia-based B2B software provider. Documents will be in extensible markup language (XML) which is more flexible than HTML, allowing groups of users to create their own tags or extensions, for integrated information flows and automated business-to-business transactions. Advantages are lower cost due to automated loading; CDOX would eliminate the need for manual retyping of faxed data and the errors made during this process; pipeline operators could start analyzing the data immediately rather than waiting to have the data keyed into their systems. A one-year pilot project is now being organized by WellPoint Systems. The pilot project will include crude oil shippers and pipeline operators. WellPoint hopes that the monthly Form A battery operators' forecast will be moving on the system within three months. During the rest of the year pilot project seven other documents are planned to be added, including notice of shipment and shippers balance.

  5. Spent nuclear fuel project product specification

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    1999-01-01

    This document establishes the limits and controls for the significant parameters that could potentially affect the safety and/or quality of the Spent Nuclear Fuel (SNF) packaged for processing, transport, and storage. The product specifications in this document cover the SNF packaged in Multi-Canister Overpacks to be transported throughout the SNF Project

  6. FutureGen Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    This report summarizes the comprehensive siting, permitting, engineering, design, and costing activities completed by the FutureGen Industrial Alliance, the Department of Energy, and associated supporting subcontractors to develop a first of a kind near zero emissions integrated gasification combined cycle power plant and carbon capture and storage project (IGCC-CCS). With the goal to design, build, and reliably operate the first IGCC-CCS facility, FutureGen would have been the lowest emitting pulverized coal power plant in the world, while providing a timely and relevant basis for coal combustion power plants deploying carbon capture in the future. The content of this report summarizes key findings and results of applicable project evaluations; modeling, design, and engineering assessments; cost estimate reports; and schedule and risk mitigation from initiation of the FutureGen project through final flow sheet analyses including capital and operating reports completed under DOE award DE-FE0000587. This project report necessarily builds upon previously completed siting, design, and development work executed under DOE award DE-FC26- 06NT4207 which included the siting process; environmental permitting, compliance, and mitigation under the National Environmental Policy Act; and development of conceptual and design basis documentation for the FutureGen plant. For completeness, the report includes as attachments the siting and design basis documents, as well as the source documentation for the following: • Site evaluation and selection process and environmental characterization • Underground Injection Control (UIC) Permit Application including well design and subsurface modeling • FutureGen IGCC-CCS Design Basis Document • Process evaluations and technology selection via Illinois Clean Coal Review Board Technical Report • Process flow diagrams and heat/material balance for slurry-fed gasifier configuration • Process flow diagrams and heat/material balance

  7. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN. PROJECT SUMMARY

    Science.gov (United States)

    This document is an eight page summary of the final report on arsenic demonstration project at Climax, MN (EPA/600/R-06/152). The objectives of the project are to evaluate the effectiveness of the Kinetico iron removal system in removing arsenic to meet the new arsenic maximum co...

  8. News from the Library: Access to CERN Council documents

    CERN Document Server

    CERN Library

    2011-01-01

    Records of the CERN Council and its Committees are now more easily available thanks to a digitisation and cataloguing project carried out by the CERN Archive team following the CERN Council's decision in September 2008 to have all paper copies of their past documents scanned and made available electronically. Over 12,000 official documents, most of them available in both English and French, are now available here.   Optical character recognition means that the full texts, as well as the cataloguing information (metadata), are searchable - just place the prefix "fulltext:" before your search term in CDS, e.g. "fulltext:Austria". Searching the metadata for "Austria" would find just four records, while the fulltext search finds 3,320. Various combinations of metadata and fulltext searching are possible to make your search as precise as you wish; for more details see the CDS Search Guide. First meeting of the CERN Council in 1955. Documents fro...

  9. Identification needs in developing, documenting, and indexing WSDOT photographs : research report, February 2010.

    Science.gov (United States)

    2010-02-01

    Over time, the Department of Transportation has accumulated image collections, which document important : aspects of the transportation infrastructure in the Pacific Northwest, project status and construction details. These : images range from paper ...

  10. Computerising documentation

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The nuclear power generation industry is faced with public concern and government pressures over safety, efficiency and risk. Operators throughout the industry are addressing these issues with the aid of a new technology - technical document management systems (TDMS). Used for strategic and tactical advantage, the systems enable users to scan, archive, retrieve, store, edit, distribute worldwide and manage the huge volume of documentation (paper drawings, CAD data and film-based information) generated in building, maintaining and ensuring safety in the UK's power plants. The power generation industry has recognized that the management and modification of operation critical information is vital to the safety and efficiency of its power plants. Regulatory pressure from the Nuclear Installations Inspectorate (NII) to operate within strict safety margins or lose Site Licences has prompted the need for accurate, up-to-data documentation. A document capture and management retrieval system provides a powerful cost-effective solution, giving rapid access to documentation in a tightly controlled environment. The computerisation of documents and plans is discussed in this article. (Author)

  11. SiGesDoC: The CIEMAT corporate document and records management system. A tool for managing, saving and disseminating knowledge; SiGesDoC: El sistema de gestion documental corporativa del CIEMAT. Una herramienta para la gestion, preservacion y difusion del conocimiento

    Energy Technology Data Exchange (ETDEWEB)

    Martin Santamaria, E.; Gonzalez Giralda, C.; Bustelo, C.; Gorostiza, C.

    2008-07-01

    The need to manage, save and disseminate technical scientific knowledge as part of the technology transfer process requires the implementation of Corporate Document and Records Management Systems that support a cultural change in the management of documentation generated in organizations as a result of their research work. In the CIEMAT, most knowledge is developed in R and D projects led by scientists and technologists and managed by the research support personnel and, therefore, it is very important to efficiently manage and control the life cycles of these projects. This article describes the implementation of a corporate document and records management system in the CIEMAT. (Author)

  12. Geothermal policy project. Quarterly report, March 1-May 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-06-01

    Efforts continued to initiate geothermal and groundwater heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Minnesota and South Carolina have agreed to a groundwater heat pump study, and Maryland and Virginia have agreed to a follow-up geothermal study in 1980. Follow-up contacts were made with several other existing project states and state meetings and workshops were held in eleven project states. Two generic documents were prepared, the Geothermal Guidebook and the Guidebook to Groundwater Heat Pumps, in addition to several state-specific documents.

  13. Optimizing the electronic health record to standardize administration and documentation of nutritional supplements.

    Science.gov (United States)

    Citty, Sandra W; Kamel, Amir; Garvan, Cynthia; Marlowe, Lee; Westhoff, Lynn

    2017-01-01

    Malnutrition in hospitalized patients is a major cause for hospital re-admission, pressure ulcers and increased hospital costs. Methods to improve the administration and documentation of nutritional supplements for hospitalized patients are needed to improve patient care, outcomes and resource utilization. Staff at a medium-sized academic health science center hospital in the southeastern United States noted that nutritional supplements ordered for patients at high risk for malnutrition were not offered or administered to patients in a standardized manner and/or not documented clearly in the electronic health record as per prescription. This paper reports on a process improvement project that redesigned the ordering, administration and documentation process of oral nutritional supplements in the electronic health record. By adding nutritional products to the medication order sets and adding an electronic nutrition administration record (ENAR) tab, the multidisciplinary team sought to standardize nutritional supplement ordering, documentation and administration at prescribed intervals. This process improvement project used a triangulated approach to evaluating pre- and post-process change including: medical record reviews, patient interviews, and nutrition formula room log reports. Staff education and training was carried out prior to initiation of the system changes. This process change resulted in an average decrease in the return of unused nutritional formula from 76% returned at baseline to 54% post-process change. The process change resulted in 100% of nutritional supplement orders having documentation about nutritional medication administration and/or reason for non-administration. Documentation in the ENAR showed that 41% of ONS orders were given and 59% were not given. Significantly more patients reported being offered the ONS product (p=0.0001) after process redesign and more patients (5% before ENAR and 86% after ENAR reported being offered the correct

  14. Documenting Climate Models and Simulations: the ES-DOC Ecosystem in Support of CMIP

    Science.gov (United States)

    Pascoe, C. L.; Guilyardi, E.

    2017-12-01

    The results of climate models are of increasing and widespread importance. No longer is climate model output of sole interest to climate scientists and researchers in the climate change impacts and adaptation fields. Now non-specialists such as government officials, policy-makers, and the general public, all have an increasing need to access climate model output and understand its implications. For this host of users, accurate and complete metadata (i.e., information about how and why the data were produced) is required to document the climate modeling results. Here we describe the ES-DOC community-govern project to collect and make available documentation of climate models and their simulations for the internationally coordinated modeling activity CMIP6 (Coupled Model Intercomparison Project, Phase 6). An overview of the underlying standards, key properties and features, the evolution from CMIP5, the underlying tools and workflows as well as what modelling groups should expect and how they should engage with the documentation of their contribution to CMIP6 is also presented.

  15. 77 FR 75915 - Review and Approval of Projects

    Science.gov (United States)

    2012-12-26

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... set forth in this proposed rulemaking is to make further modifications to the Commission's project...

  16. 75 FR 36301 - Review and Approval of Projects

    Science.gov (United States)

    2010-06-25

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Parts 806 and 808 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... the scope of withdrawals requiring review and approval; improve notice procedures for all project...

  17. A DOCUMENT PAUL AUSTER’S NEW YORK TRILOGY

    Directory of Open Access Journals (Sweden)

    Natalia N. Smirnova

    2017-03-01

    Full Text Available The article deals with the way a literary work “creates” a document out of itself, on the example of Paul Auster’s novels. A document here is the report of a character, a private detective who is watching another character (a writer but also the book of a fictional writer who is writing a story of the detective who is watching him, and eventually the book about this whole story. In this case, the search for the other, watching him, is inevitably associated with the search for oneself, self-observation. Biography becomes autobiography, e.g. a document rather than a narrative based on a document. This story becomes projected on the story of Don Quixote (of which “some” Paul Auster, a fictional writer, is writing an essay. The Other is a landmark in the vast desert of fictional worlds where Paul Auster’s Don Quixote wanders alongside other characters of the trilogy. The author may not return from his endless journey through imaginary worlds; his life does not belong to either real life or fiction. He gives life to his characters while remaining invisible himself. Paul Auster’s The New York Trilogy explores such existential situation where the only evidence of the author’s life is a document left by his character. The author leaves a documentary record of a kind about his own existence. It this sense, literature is a document of life and of the endless search for a reason to the existence of an individual who, being not equal to him- or herself, is always the other and never a type or a template.

  18. Hanford analytical sample projections FY 1998 - FY 2002

    International Nuclear Information System (INIS)

    Joyce, S.M.

    1998-01-01

    Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management, and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs

  19. Hanford analytical sample projections FY 1998--FY 2002

    Energy Technology Data Exchange (ETDEWEB)

    Joyce, S.M.

    1998-02-12

    Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management, and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs.

  20. EIA model documentation: Petroleum Market Model of the National Energy Modeling System

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-30

    The purpose of this report is to define the objectives of the Petroleum Market Model (PMM), describe its basic approach, and provide detail on how it works. This report is intended as a reference document for model analysts, users, and the public. Documentation of the model is in accordance with EIA`s legal obligation to provide adequate documentation in support of its models (Public Law 94-385, section 57.b.2). The PMM models petroleum refining activities, the marketing of products, the production of natural gas liquids and domestic methanol, projects petroleum provides and sources of supplies for meeting demand. In addition, the PMM estimates domestic refinery capacity expansion and fuel consumption.

  1. GASCAP: Wellhead Gas Productive Capacity Model documentation, June 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The Wellhead Gas Productive Capacity Model (GASCAP) has been developed by EIA to provide a historical analysis of the monthly productive capacity of natural gas at the wellhead and a projection of monthly capacity for 2 years into the future. The impact of drilling, oil and gas price assumptions, and demand on gas productive capacity are examined. Both gas-well gas and oil-well gas are included. Oil-well gas productive capacity is estimated separately and then combined with the gas-well gas productive capacity. This documentation report provides a general overview of the GASCAP Model, describes the underlying data base, provides technical descriptions of the component models, diagrams the system and subsystem flow, describes the equations, and provides definitions and sources of all variables used in the system. This documentation report is provided to enable users of EIA projections generated by GASCAP to understand the underlying procedures used and to replicate the models and solutions. This report should be of particular interest to those in the Congress, Federal and State agencies, industry, and the academic community, who are concerned with the future availability of natural gas

  2. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  3. Baseline comparison report for Project W-058, Replacement of the cross-site transfer system. Revision 1

    International Nuclear Information System (INIS)

    Mendoza, D.P.

    1995-01-01

    This BCR compares the Project W-058 Functional Design Criteria with the Project W-058 Preliminary Design Requirements Document, and identifies the differences between the two documents in the mission definition, project requirements, system functions, and interfaces. Impacts these differences have on current project design are also discussed

  4. AREVA - 2012 Reference document

    International Nuclear Information System (INIS)

    2013-03-01

    After a presentation of the person responsible for this Reference Document, of statutory auditors, and of a summary of financial information, this report address the different risk factors: risk management and coverage, legal risk, industrial and environmental risk, operational risk, risk related to major projects, liquidity and market risk, and other risks (related to political and economic conditions, to Group's structure, and to human resources). The next parts propose information about the issuer, a business overview (markets for nuclear power and renewable energies, customers and suppliers, group's strategy, operations), a brief presentation of the organizational structure, a presentation of properties, plants and equipment (principal sites, environmental issues which may affect these items), analysis and comments on the group's financial position and performance, a presentation of capital resources, a presentation of research and development activities (programs, patents and licenses), a brief description of financial objectives and profit forecasts or estimates, a presentation of administration, management and supervision bodies, a description of the operation of corporate bodies, an overview of personnel, of principal shareholders, and of transactions with related parties, a more detailed presentation of financial information concerning assets, financial positions and financial performance. Addition information regarding share capital is given, as well as an indication of major contracts, third party information, available documents, and information on holdings

  5. AREVA 2009 reference document

    International Nuclear Information System (INIS)

    2009-01-01

    This Reference Document contains information on the AREVA group's objectives, prospects and development strategies. It contains information on the markets, market shares and competitive position of the AREVA group. This information provides an adequate picture of the size of these markets and of the AREVA group's competitive position. Content: 1 - Person responsible for the Reference Document and Attestation by the person responsible for the Reference Document; 2 - Statutory and Deputy Auditors; 3 - Selected financial information; 4 - Risks: Risk management and coverage, Legal risk, Industrial and environmental risk, Operating risk, Risk related to major projects, Liquidity and market risk, Other risk; 5 - Information about the issuer: History and development, Investments; 6 - Business overview: Markets for nuclear power and renewable energies, AREVA customers and suppliers, Overview and strategy of the group, Business divisions, Discontinued operations: AREVA Transmission and Distribution; 7 - Organizational structure; 8 - Property, plant and equipment: Principal sites of the AREVA group, Environmental issues that may affect the issuer's; 9 - Analysis of and comments on the group's financial position and performance: Overview, Financial position, Cash flow, Statement of financial position, Events subsequent to year-end closing for 2009; 10 - Capital Resources; 11 - Research and development programs, patents and licenses; 12 -trend information: Current situation, Financial objectives; 13 - Profit forecasts or estimates; 14 - Administrative, management and supervisory bodies and senior management; 15 - Compensation and benefits; 16 - Functioning of corporate bodies; 17 - Employees; 18 - Principal shareholders; 19 - Transactions with related parties: French state, CEA, EDF group; 20 - Financial information concerning assets, financial positions and financial performance; 21 - Additional information: Share capital, Certificate of incorporation and by-laws; 22 - Major

  6. Video research: documenting and learning from HIV and AIDS communication strategies for social change in Ghana

    OpenAIRE

    Decosas, Heiko

    2010-01-01

    The dynamic landscape of global communications continually presents new challenges for the design and analysis of media and communication within international development projects. This Masters project uses video and web technology to document, explore and extend the role of communication in a CIDA funded HIV and AIDS stigma reduction project in Ghana, West Africa. The project includes a documentary video entitled: The Challenge of Stigma, Reflections on community education as a pathway to ch...

  7. Project W-030 safety class upgrade summary report

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1998-01-01

    This document presents a summary of safety class criteria for the 241-AY/AZ Tank Farm primary ventilation system upgrade under Project W-030, and recommends acceptance of the system as constructed, based on a review of supporting documentation

  8. Taiwan's underwater cultural heritage documentation management

    Science.gov (United States)

    Tung, Y.-Y.

    2015-09-01

    Taiwan is an important trading and maritime channels for many countries since ancient time. Numerous relics lie underwater due to weather, wars, and other factors. In the year of 2006, Bureau of Cultural Heritage (BOCH) entrusted the Underwater Archaeological Team of Academia Sinica to execute the underwater archaeological investigation projects. Currently, we verified 78 underwater targets, with 78 site of those had been recognized as shipwrecks sites. Up to date, there is a collection of 638 underwater objects from different underwater archaeological sites. Those artefacts are distributed to different institutions and museums. As very diverse management methods/systems are applied for every individual institution, underwater cultural heritage data such as survey, excavation report, research, etc. are poorly organized and disseminated for use. For better communication regarding to Taiwan's underwater cultural heritage in every level, a universal format of documentation should be established. By comparing the existing checklist used in Taiwan with guidelines that are followed in other countries, a more intact and appropriate underwater cultural heritage condition documentation system can be established and adapted in Taiwan.

  9. CMS Phase II Upgrade Scope Document

    CERN Document Server

    Butler, J; Klute, M; Mans, J; Silvestris, L; on behalf of the CMS, Collaboration; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. To fulfil the full potential of this program, which includes the study of the nature of the Higgs boson, the investigation of the properties of any newly discovered particles in the upcoming LHC runs, and the extension of the mass reach for further discoveries, an integrated luminosity of 3000 fb-1 will have to be accumulated by the end of the program. In preparation for operation at the HL-LHC , CMS has documented the necessary upgrades and their expected costs in a Technical Proposal submitted to the CERN LHC Committee (LHCC) in mid-2015. The material presented in the current “Scope Document” provides additional information to assist the LHCC and the CERN Resource Review Board (RRB) in their review of the CMS upgrade. The document commences with a summary of the process followed to develop the scope of t...

  10. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  11. a Heritage Inventory for Documenting Endangered Archaeology in the Middle East and North Africa

    Science.gov (United States)

    Sheldrick, N.; Zerbini, A.

    2017-08-01

    The heritage of the Middle East and North Africa is under growing threat from a variety of factors, including agricultural expansion, urban development, looting, and conflict. Recording and documenting this heritage is therefore a key priority to aid heritage practitioners tasked with protecting sites and evaluating their condition on the ground. The Endangered Archaeology in the Middle East and North Africa (EAMENA) project has developed a methodology for the identification, documentation, analysis, and monitoring of sites across the region to aid heritage professionals in these efforts. The project uses remote sensing techniques along with traditional archaeological research and prospection methods to collect data, which are stored and managed in a custom-designed database adapted from open-source Arches v.3 software, using CIDOC CRM standards and controlled vocabularies. In addition to these activities, the EAMENA project has initiated an international conference series and training workshops to support and establish partnerships with heritage professionals and institutions across the region.

  12. A HERITAGE INVENTORY FOR DOCUMENTING ENDANGERED ARCHAEOLOGY IN THE MIDDLE EAST AND NORTH AFRICA

    Directory of Open Access Journals (Sweden)

    N. Sheldrick

    2017-08-01

    Full Text Available The heritage of the Middle East and North Africa is under growing threat from a variety of factors, including agricultural expansion, urban development, looting, and conflict. Recording and documenting this heritage is therefore a key priority to aid heritage practitioners tasked with protecting sites and evaluating their condition on the ground. The Endangered Archaeology in the Middle East and North Africa (EAMENA project has developed a methodology for the identification, documentation, analysis, and monitoring of sites across the region to aid heritage professionals in these efforts. The project uses remote sensing techniques along with traditional archaeological research and prospection methods to collect data, which are stored and managed in a custom-designed database adapted from open-source Arches v.3 software, using CIDOC CRM standards and controlled vocabularies. In addition to these activities, the EAMENA project has initiated an international conference series and training workshops to support and establish partnerships with heritage professionals and institutions across the region.

  13. Technical Basis Document for Internal Dosimetry at Sandia National Laboratories Revision 2.

    Energy Technology Data Exchange (ETDEWEB)

    Potter, Charles A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-09-01

    The RPID Project will be implemented at all SNL facilities for activities involving the processing and/or storing of radioactive materials. This project includes activities at the Tech Area (TA) I, TA II, TA III, TA IV, TA V, Coyote Test Field, and environmental restoration sites at SNL, located in Albuquerque, New Mexico, and the Kauai Test Facility(SNL/KTF). Reference to SNL throughout this document includes facilities and activities at the Albuquerque location and at SNL/KTF.

  14. FENDL/A-MCNP and FENDL/A-VITJE. The processed neutron activation cross-section data files of the FENDL project. Version 1.1 of March 1995. Summary documentation

    International Nuclear Information System (INIS)

    Pashchenko, A.B.; Wienke, H.; Ganesan, S.

    1996-01-01

    This document summarizes a neutron activation cross-section database processed in two formats as generated by F.M. Mann within the project of the Fusion Evaluated Nuclear Data Library (FENDL): in continuous energy format as used by the Monte Carlo neutron/photon transport code MCNP; and in 175 group multigroup format with VIT-E weighting spectrum, as used by the transmutation code REAC*2/3. The data are available from the IAEA Nuclear Data Section online via INTERNET by FTP command, or on magnetic tape. (author). 2 refs, 1 tab

  15. Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex

  16. Hanford Internal Dosimetry Project manual. Revision 1

    International Nuclear Information System (INIS)

    Carbaugh, E.H.; Bihl, D.E.; MacLellan, J.A.; Long, M.P.

    1994-07-01

    This document describes the Hanford Internal Dosimetry Project, as it is administered by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy and its Hanford contractors. Project services include administrating the bioassay monitoring program, evaluating and documenting assessment of potential intakes and internal dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. Specific chapters deal with the following subjects: practices of the project, including interpretation of applicable DOE Orders, regulations, and guidance into criteria for assessment, documentation, and reporting of doses; assessment of internal dose, including summary explanations of when and how assessments are performed; recording and reporting practices for internal dose; selection of workers for bioassay monitoring and establishment of type and frequency of bioassay measurements; capability and scheduling of bioassay monitoring services; recommended dosimetry response to potential internal exposure incidents; quality control and quality assurance provisions of the program

  17. Hanford Internal Dosimetry Project manual. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Carbaugh, E.H.; Bihl, D.E.; MacLellan, J.A.; Long, M.P.

    1994-07-01

    This document describes the Hanford Internal Dosimetry Project, as it is administered by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy and its Hanford contractors. Project services include administrating the bioassay monitoring program, evaluating and documenting assessment of potential intakes and internal dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. Specific chapters deal with the following subjects: practices of the project, including interpretation of applicable DOE Orders, regulations, and guidance into criteria for assessment, documentation, and reporting of doses; assessment of internal dose, including summary explanations of when and how assessments are performed; recording and reporting practices for internal dose; selection of workers for bioassay monitoring and establishment of type and frequency of bioassay measurements; capability and scheduling of bioassay monitoring services; recommended dosimetry response to potential internal exposure incidents; quality control and quality assurance provisions of the program.

  18. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  19. Catalog of Investment Projects in Bulgaria

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-10-15

    This catalog includes information about 129 potential investment projects in Bulgaria and was developed by a team of experts from InvestBulgaria Agency in cooperation with municipalities and private companies. The document presents in brief general facts about the regions in Bulgaria. Projects are divided into the following categories: Tourism, Manufacturing, Urban Planning, Real Estate, Environment and renewable energy sources, Commerce, and Innovative and creative projects. The catalog provides detailed information about each project such as: status of the project, location, ownership, infrastructure, estimated value, contact information, etc.

  20. Beneficial Use and Recycling of Municipal Waste Combustion Residues - A Comprehensive Resource Document

    Energy Technology Data Exchange (ETDEWEB)

    Wiles, C.; Shepherd, P.

    1999-04-26

    This document summarizes information from worldwide sources on the beneficial use of residues from the combustion of municipal. The information presented, including results of numerous research projects, field demonstrations, and actual full-scale projects, demonstrates that the ash can be safely used. It includes data on ash characteristics, environmental considerations, guidance on selected ash use applications, and information on federal and state regulations and policies affecting ash use.

  1. Hybrid robust deep and shallow semantic processing for creativity support in document production

    OpenAIRE

    Uszkoreit, Hans; Callmeier, Ulrich; Eisele, Andreas; Schäfer, Ulrich; Siegel, Melanie

    2004-01-01

    The research performed in the DeepThought project (http://www.project-deepthought.net) aims at demonstrating the potential of deep linguistic processing if added to existing shallow methods that ensure robustness. Classical information retrieval is extended by high precision concept indexing and relation detection. We use this approach to demonstrate the feasibility of three ambitious applications, one of which is a tool for creativity support in document production and collective brainstormi...

  2. Solid waste information and tracking system server conversion project management plan

    International Nuclear Information System (INIS)

    MAY, D.L.

    1999-01-01

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents

  3. Documentation Service

    International Nuclear Information System (INIS)

    Charnay, J.; Chosson, L.; Croize, M.; Ducloux, A.; Flores, S.; Jarroux, D.; Melka, J.; Morgue, D.; Mottin, C.

    1998-01-01

    This service assures the treatment and diffusion of the scientific information and the management of the scientific production of the institute as well as the secretariat operation for the groups and services of the institute. The report on documentation-library section mentions: the management of the documentation funds, search in international databases (INIS, Current Contents, Inspects), Pret-Inter service which allows accessing documents through DEMOCRITE network of IN2P3. As realizations also mentioned are: the setup of a video, photo database, the Web home page of the institute's library, follow-up of digitizing the document funds by integrating the CD-ROMs and diskettes, electronic archiving of the scientific production, etc

  4. The processed neutron activation cross-section data files of the FENDL project. Summary documentation

    International Nuclear Information System (INIS)

    Ganesan, S.; Pashchenko, A.B.; Lemmle, H.D.; Mann, F.M.

    1994-01-01

    This document summarises a neutron activation cross-section database which has been processed in two formats for input to MCNP Monte Carlo codes and to REAC transmutation codes. The data are available from the IAEA Nuclear Data Section online via INTERNET by FTP command. (author)

  5. Iraqi Perspectives Project. Saddam and Terrorism: Emerging Insights from Captured Iraqi Documents. Volume 1 (Redacted)

    National Research Council Canada - National Science Library

    Woods, Kevin M; Lacey, James

    2007-01-01

    Captured Iraqi documents have uncovered evidence that links the regime of Saddam Hussein to regional and global terrorism, including a variety of revolutionary, liberation, nationalist, and Islamic...

  6. Cultural diversity: blind spot in medical curriculum documents, a document analysis.

    Science.gov (United States)

    Paternotte, Emma; Fokkema, Joanne P I; van Loon, Karsten A; van Dulmen, Sandra; Scheele, Fedde

    2014-08-22

    Cultural diversity among patients presents specific challenges to physicians. Therefore, cultural diversity training is needed in medical education. In cases where strategic curriculum documents form the basis of medical training it is expected that the topic of cultural diversity is included in these documents, especially if these have been recently updated. The aim of this study was to assess the current formal status of cultural diversity training in the Netherlands, which is a multi-ethnic country with recently updated medical curriculum documents. In February and March 2013, a document analysis was performed of strategic curriculum documents for undergraduate and postgraduate medical education in the Netherlands. All text phrases that referred to cultural diversity were extracted from these documents. Subsequently, these phrases were sorted into objectives, training methods or evaluation tools to assess how they contributed to adequate curriculum design. Of a total of 52 documents, 33 documents contained phrases with information about cultural diversity training. Cultural diversity aspects were more prominently described in the curriculum documents for undergraduate education than in those for postgraduate education. The most specific information about cultural diversity was found in the blueprint for undergraduate medical education. In the postgraduate curriculum documents, attention to cultural diversity differed among specialties and was mainly superficial. Cultural diversity is an underrepresented topic in the Dutch documents that form the basis for actual medical training, although the documents have been updated recently. Attention to the topic is thus unwarranted. This situation does not fit the demand of a multi-ethnic society for doctors with cultural diversity competences. Multi-ethnic countries should be critical on the content of the bases for their medical educational curricula.

  7. A CMMI-based approach for medical software project life cycle study.

    Science.gov (United States)

    Chen, Jui-Jen; Su, Wu-Chen; Wang, Pei-Wen; Yen, Hung-Chi

    2013-01-01

    In terms of medical techniques, Taiwan has gained international recognition in recent years. However, the medical information system industry in Taiwan is still at a developing stage compared with the software industries in other nations. In addition, systematic development processes are indispensable elements of software development. They can help developers increase their productivity and efficiency and also avoid unnecessary risks arising during the development process. Thus, this paper presents an application of Light-Weight Capability Maturity Model Integration (LW-CMMI) to Chang Gung Medical Research Project (CMRP) in the Nuclear medicine field. This application was intended to integrate user requirements, system design and testing of software development processes into three layers (Domain, Concept and Instance) model. Then, expressing in structural System Modeling Language (SysML) diagrams and converts part of the manual effort necessary for project management maintenance into computational effort, for example: (semi-) automatic delivery of traceability management. In this application, it supports establishing artifacts of "requirement specification document", "project execution plan document", "system design document" and "system test document", and can deliver a prototype of lightweight project management tool on the Nuclear Medicine software project. The results of this application can be a reference for other medical institutions in developing medical information systems and support of project management to achieve the aim of patient safety.

  8. Survey of Forensic Document Examination Habit Areas: Degree of Use and Discriminatory Power

    Energy Technology Data Exchange (ETDEWEB)

    G Sperry; PA Manzolillo; RC Hanlan; RJ Muehlberger

    1999-09-07

    Beginning in 1998, the Pacific Northwest National Laboratory (PNL), US Postal Inspection Service Forensic Laboratory (USPIS), and the Data Fusion Laboratory, Drexel University (DFL) have been collaborating on a large scale research project ''Handwriting Individuality--Moving From Art to Science''. In April 1998 a survey was distributed to the community of forensic document examiners (FDEs) requesting input on the habit areas used and their utility in distinguishing handwriting. The information obtained from this survey was intended to provide the data necessary to select the criteria and begin the evaluation of the handwriting samples currently in the project. Preliminary results of the survey were made available to the community at the American Society of Questioned Document Examiners (ASQDE) meeting in August 1998 and the American Academy of Forensic Sciences (AAFS) meeting in February 1999. This report provides final documentation of the survey and its results. This survey has two objectives: (1) to compile a list of handwriting features and characteristics used by professional forensic document examiners in the examination and comparison of handwriting and (2) to gather information about the significance of these features and characteristics. These objectives are met by having the FDEs provide an indication of their experience in the frequency of habit area evaluation and the utility of the habit area for discrimination.

  9. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  10. 4onse D1.3 - Project Identity Manual

    OpenAIRE

    Cannata Massimiliano; Strigaro Daniele

    2016-01-01

    This document describes the corporate identity which has been developed for the 4onse project. The corporate identity consists of logo for the overall project and templates for written and presentation materials and printed communication materials.

  11. Functions and requirements document, WESF decoupling project, low-level liquid waste system

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, J.H., Fluor Daniel Hanford

    1997-02-27

    The Waste Encapsulation and Storage Facility (WESF) was constructed in 1974 to encapsulate and store cesium and strontium which were isolated at B Plant from underground storage tank waste. The WESF, Building 225-B, is attached physically to the west end of B Plant, Building 221-B, 200 East area. The WESF currently utilizes B Plant facilities for disposing liquid and solid waste streams. With the deactivation of B Plant, the WESF Decoupling Project will provide replacement systems allowing WESF to continue operations independently from B Plant. Four major systems have been identified to be replaced by the WESF Decoupling Project, including the following: Low Level Liquid Waste System, Solid Waste Handling System, Liquid Effluent Control System, and Deionized Water System.

  12. Subject (of documents)

    DEFF Research Database (Denmark)

    Hjørland, Birger

    2017-01-01

    This article presents and discuss the concept “subject” or subject matter (of documents) as it has been examined in library and information science (LIS) for more than 100 years. Different theoretical positions are outlined and it is found that the most important distinction is between document......-oriented views versus request-oriented views. The document-oriented view conceive subject as something inherent in documents, whereas the request-oriented view (or the policy based view) understand subject as an attribution made to documents in order to facilitate certain uses of them. Related concepts...

  13. Improving access to research outcomes for innovation in agriculture and forestry: the VALERIE project

    Directory of Open Access Journals (Sweden)

    Luca Bechini

    2017-06-01

    Full Text Available Many excellent results are obtained in agricultural and forestry research projects, but their practical adoption is often limited. The aim of the European project VALERIE is to increase the transfer and application of innovations produced by research in agriculture and forestry, by facilitating their integration into management practices. The project is still ongoing and the results illustrated in this paper are still temporary and subject to being improved. Here we present the methodology used in VALERIE to extract and summarise knowledge for innovation from research documents with the aim of making it available to final users through ask-Valerie.eu; we also report on current progress. The tasks associated with extracting and summarising knowledge are centred on: i an ontology; ii a document base; and iii a system (ask-Valerie.eu that allows users to effectively search the document base. An ontology defines a set of concepts and the relations between them. The VALERIE ontology is built by experts in the agricultural and forestry domain and contains 6169 concepts (21st October 2016. The document base is the collection of documents in which the system searches. The VALERIE document base includes scientific and practical documents derived from various sources, written in any of a number of languages. All documents contained in the document base are annotated using the ontology: each term (a word or a short phrase in the document that matches a concept in the VALERIE-ontology is linked to that concept. Annotation is an automated process that takes place whenever a document is added to the document base. The document base contains 4278 documents (October 2016. Among them, there are 201 minifactsheets written by members of the VALERIE project, each describing an innovation with: a short description of the innovation, a list of correlated projects, and some links to scientific and practical documents. ask-Valerie.eu searches documents and fragments of

  14. High-level waste issues and resolutions document

    International Nuclear Information System (INIS)

    1994-05-01

    The High-Level Waste (HLW) Issues and Resolutions Document recognizes US Department of Energy (DOE) complex-wide HLW issues and offers potential corrective actions for resolving these issues. Westinghouse Management and Operations (M ampersand O) Contractors are effectively managing HLW for the Department of Energy at four sites: Idaho National Engineering Laboratory (INEL), Savannah River Site (SRS), West Valley Demonstration Project (WVDP), and Hanford Reservation. Each site is at varying stages of processing HLW into a more manageable form. This HLW Issues and Resolutions Document identifies five primary issues that must be resolved in order to reach the long-term objective of HLW repository disposal. As the current M ampersand O contractor at DOE's most difficult waste problem sites, Westinghouse recognizes that they have the responsibility to help solve some of the complexes' HLW problems in a cost effective manner by encouraging the M ampersand Os to work together by sharing expertise, eliminating duplicate efforts, and sharing best practices. Pending an action plan, Westinghouse M ampersand Os will take the initiative on those corrective actions identified as the responsibility of an M ampersand O. This document captures issues important to the management of HLW. The proposed resolutions contained within this document set the framework for the M ampersand Os and DOE work cooperatively to develop an action plan to solve some of the major complex-wide problems. Dialogue will continue between the M ampersand Os, DOE, and other regulatory agencies to work jointly toward the goal of storing, treating, and immobilizing HLW for disposal in an environmentally sound, safe, and cost effective manner

  15. Quality assurance program plan for SNF characterization support project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  16. SiGesDoC: The CIEMAT corporate document and records management system. A tool for managing, saving and disseminating knowledge

    International Nuclear Information System (INIS)

    Martin Santamaria, E.; Gonzalez Giralda, C.; Bustelo, C.; Gorostiza, C.

    2008-01-01

    The need to manage, save and disseminate technical scientific knowledge as part of the technology transfer process requires the implementation of Corporate Document and Records Management Systems that support a cultural change in the management of documentation generated in organizations as a result of their research work. In the CIEMAT, most knowledge is developed in R and D projects led by scientists and technologists and managed by the research support personnel and, therefore, it is very important to efficiently manage and control the life cycles of these projects. This article describes the implementation of a corporate document and records management system in the CIEMAT. (Author)

  17. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    International Nuclear Information System (INIS)

    Garrison, R.C.

    1995-01-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ''Tank Waste Remediation System (TWRS) Project Documentation Methodology,'' 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms' instrumentation, ventilation, electrical distribution, and waste transfer systems

  18. Reactive documentation system

    Science.gov (United States)

    Boehnlein, Thomas R.; Kramb, Victoria

    2018-04-01

    Proper formal documentation of computer acquired NDE experimental data generated during research is critical to the longevity and usefulness of the data. Without documentation describing how and why the data was acquired, NDE research teams lose capability such as their ability to generate new information from previously collected data or provide adequate information so that their work can be replicated by others seeking to validate their research. Despite the critical nature of this issue, NDE data is still being generated in research labs without appropriate documentation. By generating documentation in series with data, equal priority is given to both activities during the research process. One way to achieve this is to use a reactive documentation system (RDS). RDS prompts an operator to document the data as it is generated rather than relying on the operator to decide when and what to document. This paper discusses how such a system can be implemented in a dynamic environment made up of in-house and third party NDE data acquisition systems without creating additional burden on the operator. The reactive documentation approach presented here is agnostic enough that the principles can be applied to any operator controlled, computer based, data acquisition system.

  19. Project W-521, waste feed delivery systems environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities

  20. Solar Power Tower Design Basis Document, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    ZAVOICO,ALEXIS B.

    2001-07-01

    This report contains the design basis for a generic molten-salt solar power tower. A solar power tower uses a field of tracking mirrors (heliostats) that redirect sunlight on to a centrally located receiver mounted on top a tower, which absorbs the concentrated sunlight. Molten nitrate salt, pumped from a tank at ground level, absorbs the sunlight, heating it up to 565 C. The heated salt flows back to ground level into another tank where it is stored, then pumped through a steam generator to produce steam and make electricity. This report establishes a set of criteria upon which the next generation of solar power towers will be designed. The report contains detailed criteria for each of the major systems: Collector System, Receiver System, Thermal Storage System, Steam Generator System, Master Control System, and Electric Heat Tracing System. The Electric Power Generation System and Balance of Plant discussions are limited to interface requirements. This design basis builds on the extensive experience gained from the Solar Two project and includes potential design innovations that will improve reliability and lower technical risk. This design basis document is a living document and contains several areas that require trade-studies and design analysis to fully complete the design basis. Project- and site-specific conditions and requirements will also resolve open To Be Determined issues.

  1. A Science-Driven Photojournalistic Documentation of Climate Change (Invited)

    Science.gov (United States)

    Braasch, G.; Rothlein, J. E.

    2013-12-01

    World View of Global Warming is an independent photojournalistic documentation of global warming and rapid climate change begun in 1999. The intended outcomes of the work - the photographs, reportage and publications - are based on the principles of scientific accuracy, a journalistic approach, strong photographic skills, long-term observations, science literacy, education, documentation for policy makers and inspiration to others. During the course of this project the team of photojournalist and public health toxicologist visited, interviewed and/or had correspondence with more than 150 scientists in the field on every continent. Hundreds more have influenced and informed the work. World View of Global Warming has tested the idea that climate change can be more easily understood by the public and government officials through photographs which accurately and engagingly depict the locations and the scientists involved in research, communities responding to impacts of climate change and innovations for mitigation. Use of the photographs by scientists to further their own work and outreach was an immediate and continuing result, including use in journals, reports, textbooks and conferences. This presentation will demonstrate the many uses of photography in climate change communications and discuss how scientists and educators can more effectively interact with the public and media and artists. The website for this project was established in 2002 and now has more than 100 pages of photographs and information. It is strictly non-commercial and documented. Wide and repeated publication indicates the value of the project's climate communication: Exhibition at the Boston Museum of Science (2013), the National Academy of Sciences and the American Assn. for the Advancement of Science and other venues; extended use by the United Nations, UNFCCC, World Meteorological Organization, Environmental Protection Agency and the Office of Science and Technology Policy in the Executive

  2. International collaborative fire modeling project (ICFMP). Summary of benchmark

    International Nuclear Information System (INIS)

    Roewekamp, Marina; Klein-Hessling, Walter; Dreisbach, Jason; McGrattan, Kevin; Miles, Stewart; Plys, Martin; Riese, Olaf

    2008-09-01

    This document was developed in the frame of the 'International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications' (ICFMP). The objective of this collaborative project is to share the knowledge and resources of various organizations to evaluate and improve the state of the art of fire models for use in nuclear power plant fire safety, fire hazard analysis and fire risk assessment. The project is divided into two phases. The objective of the first phase is to evaluate the capabilities of current fire models for fire safety analysis in nuclear power plants. The second phase will extend the validation database of those models and implement beneficial improvements to the models that are identified in the first phase of ICFMP. In the first phase, more than 20 expert institutions from six countries were represented in the collaborative project. This Summary Report gives an overview on the results of the first phase of the international collaborative project. The main objective of the project was to evaluate the capability of fire models to analyze a variety of fire scenarios typical for nuclear power plants (NPP). The evaluation of the capability of fire models to analyze these scenarios was conducted through a series of in total five international Benchmark Exercises. Different types of models were used by the participating expert institutions from five countries. The technical information that will be useful for fire model users, developers and further experts is summarized in this document. More detailed information is provided in the corresponding technical reference documents for the ICFMP Benchmark Exercises No. 1 to 5. The objective of these exercises was not to compare the capabilities and strengths of specific models, address issues specific to a model, nor to recommend specific models over others. This document is not intended to provide guidance to users of fire models. Guidance on the use of fire models is currently being

  3. Water Integration Project Science Strategies White Paper

    International Nuclear Information System (INIS)

    Alan K. Yonk

    2003-01-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document

  4. Water Integration Project Science Strategies White Paper

    Energy Technology Data Exchange (ETDEWEB)

    Alan K. Yonk

    2003-09-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document.

  5. 42 CFR 137.360 - Does the Secretary approve project planning and design documents prepared by the Self-Governance...

    Science.gov (United States)

    2010-10-01

    ... design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and... documents prepared by the Self-Governance Tribe? The Secretary shall have at least one opportunity to...

  6. Improving the Quality of Nursing Documentation in Home Health Care Setting

    Science.gov (United States)

    Obioma, Chidiadi

    2017-01-01

    Poor nursing documentation of patient care was identified in daily nurse visit notes in a health care setting. This problem affects effective communication of patient status with other clinicians, thereby jeopardizing clinical decision-making. The purpose of this evidence-based project was to determine the impact of a retraining program on the…

  7. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT SPRINGFIELD, OH. PROJECT SUMMARY

    Science.gov (United States)

    This document is a eight page summary of the final report on arsenic demonstration project at the Chateau Estates Mobile Home Park in Springfield, OH. The objectives of the project are to evaluate the effectiveness of AdEdge Technologies’ AD-33 media in removing arsenic to meet t...

  8. Starlink Document Styles

    Science.gov (United States)

    Lawden, M. D.

    This document describes the various styles which are recommended for Starlink documents. It also explains how to use the templates which are provided by Starlink to help authors create documents in a standard style. This paper is concerned mainly with conveying the ``look and feel" of the various styles of Starlink document rather than describing the technical details of how to produce them. Other Starlink papers give recommendations for the detailed aspects of document production, design, layout, and typography. The only style that is likely to be used by most Starlink authors is the Standard style.

  9. Document understanding for a broad class of documents

    NARCIS (Netherlands)

    Aiello, Marco; Monz, Christof; Todoran, Leon; Worring, Marcel

    2002-01-01

    We present a document analysis system able to assign logical labels and extract the reading order in a broad set of documents. All information sources, from geometric features and spatial relations to the textual features and content are employed in the analysis. To deal effectively with these

  10. Mixed and Low-Level Waste Treatment Facility Project

    International Nuclear Information System (INIS)

    1992-04-01

    Mixed and low-level wastes generated at the Idaho National Engineering Laboratory (INEL) are required to be managed according to applicable State and Federal regulations, and Department of Energy Orders that provide for the protection of human health and the environment. The Mixed and Low-Level Waste Treatment Facility Project was chartered in 1991, by the Department of Energy to provide treatment capability for these mixed and low-level waste streams. The first project task consisted of conducting engineering studies to identify the waste streams, their potential treatment strategies, and the requirements that would be imposed on the waste streams and the facilities used to process them. This report documents those studies so the project can continue with an evaluation of programmatic options, system tradeoff studies, and the conceptual design phase of the project. This report, appendix B, comprises the engineering design files for this project study. The engineering design files document each waste steam, its characteristics, and identified treatment strategies

  11. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  12. NASA SBIR abstracts of 1990 phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.

    1991-01-01

    The research objectives of the 280 projects placed under contract in the National Aeronautics and Space Administration (NASA) 1990 Small Business Innovation Research (SBIR) Phase 1 program are described. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses in response to NASA's 1990 SBIR Phase 1 Program Solicitation. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 280, in order of its appearance in the body of the report. The document also includes Appendixes to provide additional information about the SBIR program and permit cross-reference in the 1990 Phase 1 projects by company name, location by state, principal investigator, NASA field center responsible for management of each project, and NASA contract number.

  13. Quality assurance program plan for cesium legacy project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents

  14. Project W-320 ALARA Plan

    International Nuclear Information System (INIS)

    Harty, W.M.

    1995-01-01

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials

  15. Project W-320 ALARA Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harty, W.M.

    1995-06-06

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials.

  16. Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    The purpose of this environmental assessment (EA) is to provide the U.S. Department of Energy (DOE) and the public with information on potential environmental impacts associated with the development of the Ponnequin Wind Energy Project in Colorado. This EA and public comments received on it will be used in DOE`s deliberations on whether to release funding for the project. This document provides a detailed description of the proposed project and an assessment of potential impacts associated with its construction and operations. Resources and conditions considered in the analysis include streams; wetlands; floodplains; water quality; soils; vegetation; air quality; socioeconomic conditions; energy resources; noise; transportation; cultural resources; visual and land use resources; public health and safety; wildlife; threatened, endangered, and candidate species; and cumulative impacts. The analysis found that the project would have minimal impacts on these resources and conditions, and would not create impacts that exceed the significance criteria defined in this document. 90 refs., 5 figs.

  17. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  18. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  19. AMADEUS Project Deliverable 1.2: Data Management Plan

    OpenAIRE

    Ana Belén Cristobal

    2018-01-01

    This document describes the initial Data Management Plan (DMP) for AMADEUS project. It addresses Project administration data collected as part of the execution and management of a disruptive research that could be in the market in the incoming years.

  20. Yucca Mountain Project Site Atlas: Volume 1: Draft

    International Nuclear Information System (INIS)

    1988-10-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) Project Site Atlas is a reference document of field activities which have been, or are being, conducted by the US Department of Energy (DOE) to support investigations of Yucca Mountain as a potential site for an underground repository for high-level radioactive waste. These investigations, as well as future investigations, will yield geologic, geophysical, geochemical, geomechanical, hydrologic, volcanic, seismic, and environmental data necessary to characterize Yucca Mountain and its regional setting. This chapter summarizes the background of the NNWSI Project and the objective, scope, structure, and preparation of the Site Atlas. Chapter 2 describes in more detail the bibliography and map portfolio portions of the Atlas, which are presented in Chapter 4 and Volume 2, respectively. Chapter 3 describes how to use the Atlas. The objective of the Site Atlas is to create a management tool for the DOE Waste Management Project Office (WMPO) that will allow the WMPO to compile and disseminate information regarding the location of NNWSI Project field investigations, and document the permits acquired and the environmental, archaeological, and socioeconomic surveys conducted to support those investigations. The information contained in the Atlas will serve as a historical reference of site investigation field activities. A companion document to the Atlas is the NNWSI Project Surface Based Investigations Plan (SBIP)

  1. Biofuels: Project summaries

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The US DOE, through the Biofuels Systems Division (BSD) is addressing the issues surrounding US vulnerability to petroleum supply. The BSD goal is to develop technologies that are competitive with fossil fuels, in both cost and environmental performance, by the end of the decade. This document contains summaries of ongoing research sponsored by the DOE BSD. A summary sheet is presented for each project funded or in existence during FY 1993. Each summary sheet contains and account of project funding, objectives, accomplishments and current status, and significant publications.

  2. NASA's Morphing Project Research Summaries in Fiscal Year 2002

    Science.gov (United States)

    McGowan, Anna-Maria R.; Waszak, Martin R.

    2005-01-01

    The Morphing Project at the National Aeronautics and Space Agency s (NASA) Langley Research Center (LaRC) is part of the Breakthrough Vehicle Technologies Project, Vehicle Systems Program that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing Project are to develop and assess the advanced technologies and integrated component concepts to enable efficient, multi-point adaptability of flight vehicles; primarily through the application of adaptive structures and adaptive flow control to substantially alter vehicle performance characteristics. This document is a compilation of research summaries and other information on the project for fiscal year 2002. The focus is to provide a brief overview of the project content, technical results and lessons learned. At the time of publication, the Vehicle Systems Program (which includes the Morphing Project) is undergoing a program re-planning and reorganization. Accordingly, the programmatic descriptions of this document pertain only to the program as of fiscal year 2002.

  3. Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

    International Nuclear Information System (INIS)

    OLGUIN, L.J.

    2000-01-01

    This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work

  4. The Sudbury Neutrino Observatory project and the Kamiokande II project

    International Nuclear Information System (INIS)

    Beier, E.W.

    1991-01-01

    This document is a technical progress report on work performed at the University of Pennsylvania during the current year on the Sudbury Neutrino Observatory project and on the Kamiokande II project. The motivation for both experiments is the measurement of neutrinos emitted by the sun. The Kamiokande II experiment was an adaptation of an existing nucleon decay detector located in Japan to search for neutrinos emitted by the sun. It has been operational since 1986. Data taking was concluded in 1990 and work will terminate at the end of this grant year. The topics discussed in this report are: the Sudbury Neutrino Observatory project; photomultiplier tube measurements; photomultiplier bases; signal processing electronics; electronics system issues; software management and development; and Kamiokande II

  5. The management, control and implementation of SCADA projects

    OpenAIRE

    2012-01-01

    M.Ing. The dissertation covers the establishment of a project from the point of view of a project manager. The document refers to examples where possible to illustrate the actual process through which a project goes during the life-cycle of the project. The first chapter provides an introduction to the context of the project and informs the reader of the type of project which the dissertation discusses. An overview of SCAD A (Supervisory Control and Data Acquisition) systems is discussed f...

  6. Hanford analytical sample projections FY 1996 - FY 2001. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Joyce, S.M.

    1997-07-02

    This document summarizes the biannual Hanford sample projections for fiscal year 1997-2001. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Wastes Remediation Systems, Solid Wastes, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition to this revision, details on Laboratory scale technology (development), Sample management, and Data management activities were requested. This information will be used by the Hanford Analytical Services program and the Sample Management Working Group to assure that laboratories and resources are available and effectively utilized to meet these documented needs.

  7. From a Content Delivery Portal to a Knowledge Management System for Standardized Cancer Documentation.

    Science.gov (United States)

    Schlue, Danijela; Mate, Sebastian; Haier, Jörg; Kadioglu, Dennis; Prokosch, Hans-Ulrich; Breil, Bernhard

    2017-01-01

    Heterogeneous tumor documentation and its challenges of interpretation of medical terms lead to problems in analyses of data from clinical and epidemiological cancer registries. The objective of this project was to design, implement and improve a national content delivery portal for oncological terms. Data elements of existing handbooks and documentation sources were analyzed, combined and summarized by medical experts of different comprehensive cancer centers. Informatics experts created a generic data model based on an existing metadata repository. In order to establish a national knowledge management system for standardized cancer documentation, a prototypical tumor wiki was designed and implemented. Requirements engineering techniques were applied to optimize this platform. It is targeted to user groups such as documentation officers, physicians and patients. The linkage to other information sources like PubMed and MeSH was realized.

  8. Generic safety documentation model

    International Nuclear Information System (INIS)

    Mahn, J.A.

    1994-04-01

    This document is intended to be a resource for preparers of safety documentation for Sandia National Laboratories, New Mexico facilities. It provides standardized discussions of some topics that are generic to most, if not all, Sandia/NM facilities safety documents. The material provides a ''core'' upon which to develop facility-specific safety documentation. The use of the information in this document will reduce the cost of safety document preparation and improve consistency of information

  9. WIPP documentation plan

    International Nuclear Information System (INIS)

    Plung, D.L.; Montgomery, T.T.; Glasstetter, S.R.

    1986-01-01

    In support of the programs at the Waste Isolation Pilot Plant (WIPP), the Publications and Procedures Section developed a documentation plan that provides an integrated document hierarchy; further, this plan affords several unique features: 1) the format for procedures minimizes the writing responsibilities of the technical staff and maximizes use of the writing and editing staff; 2) review cycles have been structured to expedite the processing of documents; and 3) the numbers of documents needed to support the program have been appreciably reduced

  10. THE DOCUMENTATION OF HISTORIC MAPS OF WORLD HERITAGE SITE CITY SUZHOU

    Directory of Open Access Journals (Sweden)

    Z. Guangwei

    2013-07-01

    Full Text Available Documentation and analysis of historic maps enhance understanding of temporal and spatial interactions between events and the evolution of physical canals upon which they occurred. And the challenge of this work lies on carefully sifting of information through the maps drawn with relative accuracy by traditional cartographical principles before the emergence of scientific survey. This research project focuses on sorting out the evolution of historic city Suzhou in a spatio-temporal view. The investigation was conducted through an in-depth analysis of historic maps. Re-projection of the geographical elements of the city to one single georeference, that is to say a standard map BASE, help acquiring an actual sense of the scale and facilitate the recognition of the city's evolution in clear details. It is an important contribution of this thesis in coordination of variously distorted geographical information contained in nineteen periods span from 1229 to 2013 into a single research resource. Through the work both quantitative and qualitative, a clear vision of the evolution and characteristics of the urban structure of ancient Suzhou is achieved. Meanwhile, in the process of projecting the historical geometrical information onto the topographic map, historical bibliographic and cartographic records is key to the data coordination and readjustment, this inspire as well on the cautious utilization of historical materials from ancient time in the recording, documentation work.

  11. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....

  12. 2002 reference document; Document de reference 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This 2002 reference document of the group Areva, provides information on the society. Organized in seven chapters, it presents the persons responsible for the reference document and for auditing the financial statements, information pertaining to the transaction, general information on the company and share capital, information on company operation, changes and future prospects, assets, financial position, financial performance, information on company management and executive board and supervisory board, recent developments and future prospects. (A.L.B.)

  13. Bulgaria: Belene NPP. Project Control. Annex 3

    International Nuclear Information System (INIS)

    Nabatov, N.

    1999-01-01

    This annex deals with project control. The Belene project has been suspended for 7 years after approx. 50% of money had been spent. Equipment, structures and documentation have been well protected, but majority of qualified personnel have been lost. Resumption of work awaits government decision and provision of funds. (author)

  14. Pre-feasibility study template for nZEB pilot projects development

    OpenAIRE

    Crespo Sánchez, Eva

    2015-01-01

    This document corresponds to Task 5.2 NZEB pilot projects development, Deliverable 5.2 Basic project conceptual design with feasibility analysis for eight pilot project of the SUSTAINCO project and should present a structure of pre-feasibility studies for eight NZEB projects implementation. It aims to give an overview of how SUSTAINCO project implementation is to be prepared and which technical and financial parameters to concern.

  15. ParaText : scalable solutions for processing and searching very large document collections : final LDRD report.

    Energy Technology Data Exchange (ETDEWEB)

    Crossno, Patricia Joyce; Dunlavy, Daniel M.; Stanton, Eric T.; Shead, Timothy M.

    2010-09-01

    This report is a summary of the accomplishments of the 'Scalable Solutions for Processing and Searching Very Large Document Collections' LDRD, which ran from FY08 through FY10. Our goal was to investigate scalable text analysis; specifically, methods for information retrieval and visualization that could scale to extremely large document collections. Towards that end, we designed, implemented, and demonstrated a scalable framework for text analysis - ParaText - as a major project deliverable. Further, we demonstrated the benefits of using visual analysis in text analysis algorithm development, improved performance of heterogeneous ensemble models in data classification problems, and the advantages of information theoretic methods in user analysis and interpretation in cross language information retrieval. The project involved 5 members of the technical staff and 3 summer interns (including one who worked two summers). It resulted in a total of 14 publications, 3 new software libraries (2 open source and 1 internal to Sandia), several new end-user software applications, and over 20 presentations. Several follow-on projects have already begun or will start in FY11, with additional projects currently in proposal.

  16. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1988-01-01

    US Department of Energy (DOE) Shippingport Station Decommissioning Project (SSDP) decommissioned, decontaminated, and dismantled the world's first, nuclear fueled, commercial size, electric power plant. SSDP programmatic goal direction for technology transfer is documentation of project management and operations experience. Objective is to provide future nuclear facility decommissioning projects with pertinent SSDP performance data for project assessment, planning, and operational implementation. This paper presents a working definition for technology transfer. Direction is provided for access and availability for SSDP technology acquisition

  17. Documenting Employee Conduct

    Science.gov (United States)

    Dalton, Jason

    2009-01-01

    One of the best ways for a child care program to lose an employment-related lawsuit is failure to document the performance of its employees. Documentation of an employee's performance can provide evidence of an employment-related decision such as discipline, promotion, or discharge. When properly implemented, documentation of employee performance…

  18. Review of IAEA documentation on Nuclear and radiological emergency

    International Nuclear Information System (INIS)

    Mukhono, P. M.

    2014-10-01

    The project focuses on the review of IAEA documentation on nuclear or radiological emergencies with main focus on methodology for developing and arrangement for nuclear and radiological emergencies. The main objective of this work is to identify limitations in IAEA documentation on emergency preparedness and response (EPR) and provide recommendation on the main actions needed to fill the gaps identified thus aiding in improvement of emergency preparedness and response to nuclear and radiological accidents. The review of IAEA documentation on nuclear and radiological emergency has been carried out by evaluating various emergency response elements. Several elements for EPR were highlighted covering the safety fundamentals, general safety requirements and EPR methods for development of an effective emergence response capability for nuclear or radiological emergencies. From these issues, the limitations of IAEA documentation on EPR were drawn and recommendations suggested as a means of improving EPR methods. Among them was the need for IAEA consider establishment of follow up and inspection programmes to facilitate implementation of EPR requirements in most developing countries, establishment of programmes that provide platforms for the countries to be motivated to update their system in line with the current status of emergency preparedness, review of the international information exchange aspects of nuclear emergencies in order to improve capabilities to communicate reliable data, information and decisions quickly and effectively among national authorities and their emergency and emergency response centres. (au)

  19. Wind turbine environmental assessment -- Vol 1: Screening document

    International Nuclear Information System (INIS)

    2000-04-01

    The environmental effects of the proposed construction and operation of up to three wind turbines on the Toronto waterfront are evaluated in accordance with the requirements of the Canadian Environmental Assessment Act (CEAA) and Regulations. The nine sections of the report provide background on the environmental assessment and the wind turbine project; provide justification for the project and describes alternative sites and wind turbine technologies; outlines the scope of the project; sketches the biophysical and socio-economic environment; presents an evaluation of the environmental impacts and proposed mitigating measures; describes the public consultation program that was carried out; summarizes the comments received from interested parties; presents the conclusion of the environmental impact assessment; and responds to the public comments received on the draft screening document. Most of the concerns raised involved avoidance reactions by birds, disruption or fragmentation of wildlife, the potential for high kill rate of small nocturnal migrants and young birds, and the effect of noise on breeding birds. The overall recommendation of the consultants is that the project is not likely to cause significant adverse environmental effects and its construction and operations should be authorized. 115 refs., 8 tabs., 2 figs. (14 appendices are in volume 2)

  20. Health physics documentation

    International Nuclear Information System (INIS)

    Stablein, G.

    1980-01-01

    When dealing with radioactive material the health physicist receives innumerable papers and documents within the fields of researching, prosecuting, organizing and justifying radiation protection. Some of these papers are requested by the health physicist and some are required by law. The scope, quantity and deposit periods of the health physics documentation at the Karlsruhe Nuclear Research Center are presented and rationalizing methods discussed. The aim of this documentation should be the application of physics to accident prevention, i.e. documentation should protect those concerned and not the health physicist. (H.K.)

  1. The European Utility Requirement Document

    International Nuclear Information System (INIS)

    Roche, I.I.

    1999-01-01

    The major European electricity producers work on a common requirement document for future LWR plants since 1992. They aim at requirements acceptable together by the owners, the public and the authorities. Thus the designers can develop standard LWR designs acceptable everywhere in Europe and the utilities can open their consultations to vendors on common bases. Such a standardisation promotes an improvement of generation costs and of safety : public and authorities acceptance should be improved as well ; significant savings are expected in development and construction costs. Since the early stages of the project, the EUR group has grown significantly. It now includes utilities from nine European countries. Utilities from two other European countries are joining the group. Specific cooperation agreements are also in progress with a few extra-European partners

  2. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  3. Presentations and documents submitted to the 26. meeting, NEA Headquarters

    International Nuclear Information System (INIS)

    2014-05-01

    The NEA's nuclear data evaluation co-operation activities involve the following evaluation projects: ENDF (United States), JENDL (Japan), ROSFOND/BROND (Russia), JEFF (other Data Bank member countries) and CENDL (China) in close co-operation with the Nuclear Data Section of the International Atomic Energy Agency (IAEA). The working party was established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations, validation, and related topics, and to provide a framework for co-operative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint evaluation and/or measurement efforts. This document is a compilation of the available Presentations (slides) and documents (reports) submitted to the 26. WPEC meeting: Summary record of the previous meeting, May 2013; Membership and observers - May 2014 (Participation, Informal discussions on criteria defining an 'evaluation project'); 25. Anniversary of WPEC and brief overview of WPEC history; Reports on experimental activities: Europe, Japan, USA, Russia (no presentation available), China; Brief progress reports from the evaluation projects: ENDF, JEFF, JENDL, BROND/ROSFOND (no presentation available), CENDL, IAEA, TENDL; Status of subgroups: Subgroup 27: Prompt photon production from fission products (no presentation available), Subgroup 28: Processing of covariance data, Subgroup 31: Meeting nuclear data needs for advanced reactors, Subgroup 33: Methods and issues for the combined use of integral experiments and covariance data, Subgroup 34: Coordinated evaluation of Pu-239 in the resonance region, Subgroup 35: Scattering angular distribution in the fast energy range (no presentation available), Subgroup 36: Reporting and usage of experimental data for evaluation in the resolved resonance region, Subgroup 37: Improved fission product yield evaluation methodologies, Subgroup 38: A

  4. Reactor vessel decommissioning project. Final report

    International Nuclear Information System (INIS)

    Schoonen, D.H.

    1984-09-01

    This report describes a reactor vessel decommissioning project; it documents and explains the project objectives, scope, performance results, and sodium removal process. The project was successfully completed in FY-1983, within budget and without significant problems or adverse impact on the environment. Waste generated by the operation included the reactor vessel, drained sodium, and liquid, solid, and gaseous wastes which were significantly less than project estimates. Personnel radiation exposures were minimized, such that the project total was one-half the predicted exposure level. Except for the sodium removed, the material remaining in the reactor vessel is essentially the same as when the vessel arrived for processing

  5. Spent nuclear fuel project-criteria document Cold Vacuum Drying Facility phase 2 safety analysis report

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1998-01-01

    The criteria document provides the criteria and guidance for developing the SNF CVDF Phase 2 SAR. This SAR will support the US Department of Energy, Richland Operations Office decision to authorize the procurement, installation, and installation acceptance testing of the CVDF systems

  6. Innovative maintenance concept 0f Siemens Energy Service. Turbine documentation in an online catalogue; Innovatives Instandhaltungskonzept bei Siemens Energy Service. Turbinendokumentation als Onlinekatalog

    Energy Technology Data Exchange (ETDEWEB)

    Bitzer, Gerd [Wessendorf Software and Consulting, Berlin (Germany); Stass, Georg [Tema Technologie Marketing AG, Berlin (Germany)

    2010-10-04

    For optimization of its maintenance services, Siemens Energy Services has drawn up an online catalogue as a standardized solution for turbine documentation for customers and service technicians. The new catalogue offers power plant operators internet access to the current documentation of service-relevant replacement parts for machinery. The catalogues are based on SAP data using the Linkone software; each of them has up to 3,000 material items and 1,000 illustrations of replacement parts depending on the type of turbine. The project partner was the Berlin consulting service Wessendorf Software + Consulting (WSC) who have vast experience in the implementation of international catalogue and documentation projects with SAP software. After a project period of 15 months, the innovative solution was implemented in April 2010 and then launched in the market. (orig.)

  7. USING REMOTELY SENSED DATA FOR DOCUMENTATION OF ARCHAEOLOGICAL SITES IN NORTHEASTERN MESOPOTAMIA

    Directory of Open Access Journals (Sweden)

    E. Matoušková

    2016-06-01

    Full Text Available This paper introduces two archaeological sites documented during the MULINEM (The Medieval Urban Landscape in Northeastern Mesopotamia project. This project investigates the Late Sasanian and Islamic urban network in the land of Erbil, a historic province of Hidyab (Adiabene that is located in northern Iraq. The investigated sites are the two deserted cities of Makhmúr al-Quadíma and Al-Hadítha. It is assumed that these two sites used to form large cities with high business and cultural importance in the medieval period. The archaeological locations are endangered by various threats.The Al-Hadítha site seems to be under the control of the „Islamic state“ at the moment and Makhmúr al-Quadíma is located just next to the town of new Makhmúr that expands rapidly and without complex urban plans. Documentation of the archaeological sites has been done by using remotely sensed methods together with in-situ measurements (where available. FORMOSAT-2 data that has been gained through a research announcement: Free FORMOSAT-2 satellite imagery and when combined with other sources (recent and historical data it provides a powerful documentation tool. In-situ RPAS measurements and a DTM creation furnish a new source of highly valuable information. Influence of the political and security situation in Al-Hadítha will be analysed.

  8. Using Remotely Sensed Data for Documentation of Archaeological Sites in Northeastern Mesopotamia

    Science.gov (United States)

    Matoušková, E.; Starková, L.; Pavelka, K.; Nováček, K.; Šedina, J.; Faltýnová, M.; Housarová, E.

    2016-06-01

    This paper introduces two archaeological sites documented during the MULINEM (The Medieval Urban Landscape in Northeastern Mesopotamia) project. This project investigates the Late Sasanian and Islamic urban network in the land of Erbil, a historic province of Hidyab (Adiabene) that is located in northern Iraq. The investigated sites are the two deserted cities of Makhmúr al-Quadíma and Al-Hadítha. It is assumed that these two sites used to form large cities with high business and cultural importance in the medieval period. The archaeological locations are endangered by various threats.The Al-Hadítha site seems to be under the control of the „Islamic state" at the moment and Makhmúr al-Quadíma is located just next to the town of new Makhmúr that expands rapidly and without complex urban plans. Documentation of the archaeological sites has been done by using remotely sensed methods together with in-situ measurements (where available). FORMOSAT-2 data that has been gained through a research announcement: Free FORMOSAT-2 satellite imagery and when combined with other sources (recent and historical data) it provides a powerful documentation tool. In-situ RPAS measurements and a DTM creation furnish a new source of highly valuable information. Influence of the political and security situation in Al-Hadítha will be analysed.

  9. Civilian Radioactive Waste Management System Requirements Document (CRP)

    International Nuclear Information System (INIS)

    C.A. Kouts

    2006-01-01

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further

  10. AFSC Laboratory Management Information Requirements Project

    National Research Council Canada - National Science Library

    1982-01-01

    This document was developed under the auspices of the Laboratory IRM (LIRM) Management Working Group in response to AFSC Program Directive 0008-81-1, Management Information Requirement Project (23 February 1981...

  11. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  12. Project W-049H disposal facility test report

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1995-01-01

    The purpose of this Acceptance Test Report (ATR) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the equipment installed in the Disposal Facility has been installed in accordance with the design documents and function as required by the project criteria

  13. FANS-3D Users Guide (ESTEP Project ER 201031)

    Science.gov (United States)

    2016-08-01

    TECHNICAL DOCUMENT 3293 August 2016 FANS -3D User’s Guide (ESTEP Project ER-201031) Pei-Fang Wang SSC Pacific Hamn-Ching...1.1 THEORY AND NUMERICAL ALGORITHM OF FANS CODE ............................................. 1 2. FANS -3D SOFTWARE DOCUMENTATION AND EXECUTION...5 3. FANS -3D CODE PARALLELIZATION

  14. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Final EIR/EIS

    International Nuclear Information System (INIS)

    1994-01-01

    On May 26, 1994, the Lake County Sanitation District and the US Bureau of Land Management released for public review a Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) on the proposed Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. A minimum 45-day review and comment period began on that date and notices were published in the Federal Register. The public review and comment period closed on July 26, 1994. Public hearings on the Draft EIMIS were held in Lakeport, CA, on June 30 and July 14, 1994. The first part of this document contains copies of the written comments submitted on the Draft EIR/EIS. It also contains summary paraphrased comments of the public hearings. The second part of this document contains responses to the comments

  15. Pilot project of atomic energy technology record

    International Nuclear Information System (INIS)

    Song, K. C.; Kim, Y. I.; Kim, Y. G.

    2011-12-01

    Project of the Atomic Energy Technology Record is the project that summarizes and records in each category as a whole summary from the background to the performance at all fields of nuclear science technology which researched and developed at KAERI. This project includes Data and Document Management System(DDMS) that will be the system to collect, organize and preserve various records occurred in each research and development process. To achieve these goals, many problems should be solved to establish technology records process, such as issues about investigation status of technology records in KAERI, understanding and collection records, set-up project system and selection target field, definition standards and range of target records. This is a research report on the arrangement of research contents and results about pilot project which records whole nuclear technology researched and developed at KAERI in each category. Section 2 summarizes the overview of this pilot project and the current status of technology records in domestic and overseas, and from Section 3 to Section 6 summarize contents and results which performed in this project. Section 3 summarizes making TOC(Table of Content) and technology records, Section 4 summarizes sectoral templates, Section 5 summarizes writing detailed plan of technology records, and Section 6 summarizes Standard Document Numbering System(SDNS). Conclusions of this report are described in Section 7

  16. Hanford Area 1990 population and 50-year projections

    International Nuclear Information System (INIS)

    Beck, D.M.; Scott, M.J.; Shindle, S.F.; Napier, B.A.; Thurman, A.G.; Batishko, N.C.; Davis, M.D.; Pittenger, D.B.

    1991-10-01

    The complex and comprehensive safety analysis activities carried out at Hanford for nonreactor nuclear facilities require data from a number of scientific and engineering disciplines. The types of data that are required include data pertaining to current population and population projections. The types of data found in this document include 1990 census totals for residential population within a 50-mile radius of the 100-N, 200, 300, and 400 Area meteorological towers. This document also contains 50-year projections for residential populations within a 50-mile radius of these four meteorological towers. The analysis of population projections indicates that residential population within a 50-mile radius of the four meteorological towers in question will continue to grow through 2040, although at a slower rate each decade. In all cases, the highest growth is projected for the decade ending in the year 2000. The annual growth rate for this period is projected to be 0.646, 0.633, 0.543, and 0.570 in the 100-N, 200, 300, and 400 Areas, respectively. By 2040, these growth rates are projected to drop to 0.082, 0.068, 0.078, 0.078, respectively. 4 refs., 1 figs., 4 tabs

  17. Spent Nuclear Fuel Project Configuration Management Plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This document is a rewrite of the draft ''C'' that was agreed to ''in principle'' by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project

  18. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  19. White Paper on Data Repository Reorganization Proposal for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B [ORNL; Williams, Paul T [ORNL; Bass, Bennett Richard [ORNL

    2012-09-01

    As the xLPR project moves along, it is important to properly manage the knowledge generated by the different groups. We focus specifically on the knowledge and communications written in files, including general documents, source code and executable files. Data generated through the project are different in nature and, for this reason, need to be treated differently. To that end, ORNL put in place a series of tools that facilitate proper storage and management of project data, document and code changes, group collaboration, knowledge transfer, transparency, accountability and auditability. This paper describes the approaches/tools that we recommend for moving the project forward on knowledge management.

  20. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  1. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2008-01-01

    in the course of the project, when there is neither time nor financial possibilities for solving the problems. The objective of the WPU project is to develop new methods for usability engineering in the development of web portals and to test these methods in companies that develop modern web portals. The result......The Web Portal Usability (WPU) project focuses on usability in the development of modern web portals. Web portals are a key part of software development. They are created to provide a group of users with access to a collection of internet services. State-of-the-art methods for usability engineering...... is a catalogue of methods that support usability engineering in web portal development, combined with guidelines for use, training programmes and documented experience from deployment and use of the methods. The WPU project is a collaborative effort between researchers from Aalborg University, Department...

  2. Standardization Documents

    Science.gov (United States)

    2011-08-01

    Specifications and Standards; Guide Specifications; CIDs; and NGSs . Learn. Perform. Succeed. STANDARDIZATION DOCUMENTS Federal Specifications Commercial...national or international standardization document developed by a private sector association, organization, or technical society that plans ...Maintain lessons learned • Examples: Guidance for application of a technology; Lists of options Learn. Perform. Succeed. DEFENSE HANDBOOK

  3. Traceability and retrievability: Documentation, the bridge from science to compliance

    International Nuclear Information System (INIS)

    Warner, P.J.

    1997-01-01

    In this day of regulatory compliance, the fact that good science was practiced and documented is, in and of itself, not enough to assure a successful licensing or permitting result. A new level of documentation, that clearly walks a non-project reviewer through the traceability of all activities and decisions is required for successful acceptance of scientific results. Compliance reviewers (whether the Nuclear Regulatory Commission (NRC), Environmental Protection Agency (EPA), etc.) expect to verify the results of the scientific and program activities without the physical presence of the person or persons that conducted the activity. Traceability of activities and associated decisions through the retrieval of all associated records is a must. This presentation is based on lessons learned from the various quality assurance (QA) audits and program reviews of Sandia National Laboratories, Nuclear Waste Management Programs Center, scientific and programmatic documentation. The authors build a bridge from science to compliance from lessons learned. Here now is a somewhat fictional rendition of actual scientific testing and compliance support activities

  4. CERCLA document flow: Compressing the schedule, saving costs, and expediting review at the Savannah River Site

    International Nuclear Information System (INIS)

    Hoffman, W.D.

    1991-01-01

    The purpose of this paper is to convey the logic of the CERCLA document flow including Work Plans, Characterization Studies, Risk Assessments, Remedial Investigations, Feasibility Studies, proposed plans, and Records of Decision. The intent is to show how schedules at the Savannah River Site are being formulated to accomplish work using an observational approach where carefully planned tasks can be initiated early and carried out in parallel. This paper will share specific proactive experience in working with the EPA to expedite projects, begin removal actions, take interim actions, speed document flow, and eliminate unnecessary documents from the review cycle

  5. Intelligent Multi-Media Integrated Interface Project

    Science.gov (United States)

    1990-06-01

    been devoted to the application of aritificial intelligence technology to the development of human -computer interface technology that integrates speech...RADC-TR-90-128 Final Technical Report June 1090 AD-A225 973 INTELLIGENT MULTI-MEDIA INTEGRATED INTERFACE PROJECT Calspan-University of Buffalo...contractual obligations or notices on a specific document require that it be returned. INTELLIGENT MULTI-MEDIA INTEGRATED INTERFACE PROJECT J. G. Neal J. M

  6. Academic Librarians and Project Management: An International Study

    Science.gov (United States)

    Serrano, Silvia Cobo; Avilés, Rosario Arquero

    2016-01-01

    Because information and documentation units in libraries have responsibility for an ever-increasing number of projects, this paper aims at analyzing the discipline of project management in library and information science (LIS) from a professional perspective. To that end, the researchers employed quantitative and qualitative methodology based on a…

  7. Alpena Community College Workplace Partnership Project. Final Report.

    Science.gov (United States)

    Alpena Community Coll., MI.

    This document consists of materials produced during the Workplace Partnership Project (WPP), a National Workplace Literacy Program-funded workplace literacy partnership between Alpena Community College (ACC) in Alpena, Michigan, and area businesses. Presented first is a personal reflection in which the project director shares some of the lessons…

  8. Idaho National Engineering Laboratory Waste Management Operations Roadmap Document

    International Nuclear Information System (INIS)

    Bullock, M.

    1992-04-01

    At the direction of the Department of Energy-Headquarters (DOE-HQ), the DOE Idaho Field Office (DOE-ID) is developing roadmaps for Environmental Restoration and Waste Management (ER ampersand WM) activities at Idaho National Engineering Laboratory (INEL). DOE-ID has convened a select group of contractor personnel from EG ampersand G Idaho, Inc. to assist DOE-ID personnel with the roadmapping project. This document is a report on the initial stages of the first phase of the INEL's roadmapping efforts

  9. Sri Dalada Maligawa - 3D-Scanning and Documentation of the Temple of the Sacred Tooth Relic at Kandy, Sri Lanka

    Science.gov (United States)

    Rahrig, M.; Luib, A.

    2017-08-01

    Sri Dalada Maligawa - the Temple of the Sacred Tooth Relic - is one of the most important pilgrim sites in Buddhist culture. It is the main part of the UNESCO World Heritage Site Sacred City of Kandy. Since the end of the 17th century the temple has been keeping the sacred tooth of the Buddha. Until now an accurate documentation of the temple with all its rich decorations is missing. The Temple is built in an area vulnerable to environmental factors like earthquakes or monsoon rains and was the target of terrorist attacks. To help preserving this important cultural heritage a research project was carried out. Main part of the project was a 3D-documentation of the entire temple by using Terrestrial-Laser-Scanning (TLS) and the creating of CAD-Plans. In addition to the documentation of the architecture several details were taken in high resolution by Structured-Light-Scanning (SLS). All data will be part of the digital archive of the temple and were used as a base for a general site monitoring, especially to observe cracks. Next to the mere documentation a transfer of knowledge was another aim of the project. In future most of the analysis of the scan data can be done by local specialists.

  10. Evaluation of impacts and mitigation assessments for the UMTRA Project: Gunnison and Durango pilot studies. Final report

    International Nuclear Information System (INIS)

    Beranich, S.J.

    1994-01-01

    This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed for mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process

  11. SPI Project Criticality Task Force initial review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Marsden, R.S.; Worle, H.A.

    1980-03-01

    The Slagging Pyrolysis Incinerator (SPI) Facility is being developed to process transuranic waste stored and buried at the Idaho National Engineering Laboratory (INEL) into a chemically inert, physically stable, basalt-like residue acceptable for a Federal Repository. A task force was established by the SPI Project Division to review and assess all aspects of criticality safety for the SPI Facility. This document presents the initial review, evaluations, and recommendations of the task force and includes the following: background information on waste characterization, and criticality control approaches and philosophies, a description of the SPI Facility Waste Processing Building, a review and assessment of potentially relevant codes and regulations; a review and assessment of the present state of criticality and assaying/monitoring studies, and recommendations for changes in and additions to these studies. The review and assessment of potentially relevant codes and regulations indicate that ERDAM 0530, Nuclear Criticality Safety should be the controlling document for criticality safety for the SPI Project. In general, the criticality control approaches and philosophies for the SPI Project comply with this document

  12. Documentation, User Support, and Verification of Wind Turbine and Plant Models

    Energy Technology Data Exchange (ETDEWEB)

    Robert Zavadil; Vadim Zheglov; Yuriy Kazachkov; Bo Gong; Juan Sanchez; Jun Li

    2012-09-18

    As part of the Utility Wind Energy Integration Group (UWIG) and EnerNex's Wind Turbine Modeling Project, EnerNex has received ARRA (federal stimulus) funding through the Department of Energy (DOE) to further the progress of wind turbine and wind plant models. Despite the large existing and planned wind generation deployment, industry-standard models for wind generation have not been formally adopted. Models commonly provided for interconnection studies are not adequate for use in general transmission planning studies, where public, non-proprietary, documented and validated models are needed. NERC MOD (North American Electric Reliability Corporation) reliability standards require that power flow and dynamics models be provided, in accordance with regional requirements and procedures. The goal of this project is to accelerate the appropriate use of generic wind turbine models for transmission network analysis by: (1) Defining proposed enhancements to the generic wind turbine model structures that would allow representation of more advanced; (2) Comparative testing of the generic models against more detailed (and sometimes proprietary) versions developed by turbine vendors; (3) Developing recommended parameters for the generic models to best mimic the performance of specific commercial wind turbines; (4) Documenting results of the comparative simulations in an application guide for users; (5) Conducting technology transfer activities in regional workshops for dissemination of knowledge and information gained, and to engage electric power and wind industry personnel in the project while underway; (6) Designing of a "living" homepage to establish an online resource for transmission planners.

  13. Methodologies for Improving Flight Project Information Capture, Storage, and Dissemination

    Science.gov (United States)

    Equils, Douglas J.

    2011-01-01

    This paper will discuss the drawbacks and risks of the current documentation paradigm, how Document QuickStart improves on that process and ultimately how this stream-lined approach will reduce risk and costs to the next generation of Flight Projects at JPL

  14. Synthesis document on the long time behavior of packages: operational document ''bituminous'' 2204

    International Nuclear Information System (INIS)

    Tiffreau, C.

    2004-09-01

    This document is realized in the framework of the law of 1991 on the radioactive wastes management. The 2004 synthesis document on long time behavior of bituminous sludges packages is constituted by two documents, the reference document and the operational document. This paper presents the operational model describing the water alteration of the packages and the associated radioelements release, as the gas term source and the swelling associated to the self-irradiation and the bituminous radiolysis. (A.L.B.)

  15. Use of a structured template to facilitate practice-based learning and improvement projects.

    Science.gov (United States)

    McClain, Elizabeth K; Babbott, Stewart F; Tsue, Terance T; Girod, Douglas A; Clements, Debora; Gilmer, Lisa; Persons, Diane; Unruh, Greg

    2012-06-01

    The Accreditation Council for Graduate Medical Education (ACGME) requires residency programs to meet and demonstrate outcomes across 6 competencies. Measuring residents' competency in practice-based learning and improvement (PBLI) is particularly challenging. We developed an educational tool to meet ACGME requirements for PBLI. The PBLI template helped programs document quality improvement (QI) projects and supported increased scholarly activity surrounding PBLI learning. We reviewed program requirements for 43 residency and fellowship programs and identified specific PBLI requirements for QI activities. We also examined ACGME Program Information Form responses on PBLI core competency questions surrounding QI projects for program sites visited in 2008-2009. Data were integrated by a multidisciplinary committee to develop a peer-protected PBLI template guiding programs through process, documentation, and evaluation of QI projects. All steps were reviewed and approved through our GME Committee structure. An electronic template, companion checklist, and evaluation form were developed using identified project characteristics to guide programs through the PBLI process and facilitate documentation and evaluation of the process. During a 24 month period, 27 programs have completed PBLI projects, and 15 have reviewed the template with their education committees, but have not initiated projects using the template. The development of the tool generated program leaders' support because the tool enhanced the ability to meet program-specific objectives. The peer-protected status of this document for confidentiality and from discovery has been beneficial for program usage. The document aggregates data on PBLI and QI initiatives, offers opportunities to increase scholarship in QI, and meets the ACGME goal of linking measures to outcomes important to meeting accreditation requirements at the program and institutional level.

  16. Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1993-10-01

    Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

  17. Managing externally financed projects: the Integrated Primary Health Care Project in Bolivia.

    Science.gov (United States)

    Homedes, N

    2001-12-01

    Bolivia is one of the poorest countries in Latin America. Health indicators are very poor, communicable diseases are prevalent and, coupled with malnutrition, remain the major killers of children under 5 years old. The Integrated Primary Health Care Project (PROISS) was a US$39 million project executed by the Ministry of Health (MOH), 50% financed by the World Bank and aimed at improving primary health care in the four largest Bolivian municipalities. The implementation of the project started in 1990 and ended in 1997. During implementation it went through three distinct phases: Phase 1 (1990-94) was a period characterized by conflict and confusion; Phase 2 (1995-mid-1996) documented major improvements in coverage and service quality; and Phase 3 (mid-1996-97) witnessed the decline of the project. This paper explores the factors that contributed to the success and the decline of the project, draws lessons for project managers and international agencies involved in the definition and implementation of social sector projects, and discusses the unlikelihood that externally financed projects can have a sustainable impact on the development of the health sector of recipient countries.

  18. Ancient administrative handwritten documents: X-ray analysis and imaging

    International Nuclear Information System (INIS)

    Albertin, F.; Astolfo, A.; Stampanoni, M.; Peccenini, Eva; Hwu, Y.; Kaplan, F.; Margaritondo, G.

    2015-01-01

    The heavy-element content of ink in ancient administrative documents makes it possible to detect the characters with different synchrotron imaging techniques, based on attenuation or refraction. This is the first step in the direction of non-interactive virtual X-ray reading. Handwritten characters in administrative antique documents from three centuries have been detected using different synchrotron X-ray imaging techniques. Heavy elements in ancient inks, present even for everyday administrative manuscripts as shown by X-ray fluorescence spectra, produce attenuation contrast. In most cases the image quality is good enough for tomography reconstruction in view of future applications to virtual page-by-page ‘reading’. When attenuation is too low, differential phase contrast imaging can reveal the characters from refractive index effects. The results are potentially important for new information harvesting strategies, for example from the huge Archivio di Stato collection, objective of the Venice Time Machine project

  19. Ancient administrative handwritten documents: X-ray analysis and imaging

    Energy Technology Data Exchange (ETDEWEB)

    Albertin, F., E-mail: fauzia.albertin@epfl.ch [Ecole Polytechnique Fédérale de Lausanne (EPFL), CH-1015 Lausanne (Switzerland); Astolfo, A. [Paul Scherrer Institut (PSI), Villigen (Switzerland); Stampanoni, M. [Paul Scherrer Institut (PSI), Villigen (Switzerland); ETHZ, Zürich (Switzerland); Peccenini, Eva [University of Ferrara (Italy); Technopole of Ferrara (Italy); Hwu, Y. [Academia Sinica, Taipei, Taiwan (China); Kaplan, F. [Ecole Polytechnique Fédérale de Lausanne (EPFL) (Switzerland); Margaritondo, G. [Ecole Polytechnique Fédérale de Lausanne (EPFL), CH-1015 Lausanne (Switzerland)

    2015-01-30

    The heavy-element content of ink in ancient administrative documents makes it possible to detect the characters with different synchrotron imaging techniques, based on attenuation or refraction. This is the first step in the direction of non-interactive virtual X-ray reading. Handwritten characters in administrative antique documents from three centuries have been detected using different synchrotron X-ray imaging techniques. Heavy elements in ancient inks, present even for everyday administrative manuscripts as shown by X-ray fluorescence spectra, produce attenuation contrast. In most cases the image quality is good enough for tomography reconstruction in view of future applications to virtual page-by-page ‘reading’. When attenuation is too low, differential phase contrast imaging can reveal the characters from refractive index effects. The results are potentially important for new information harvesting strategies, for example from the huge Archivio di Stato collection, objective of the Venice Time Machine project.

  20. Gewijzigd plan F-project werkplan voor jaar 4 en 5

    NARCIS (Netherlands)

    Quirijns, F.J.; Keeken, van O.A.; Densen, van W.L.T.; Pastoors, M.A.; Rijnsdorp, A.D.

    2005-01-01

    Oorspronkelijk zou het F-project lopen van 1 maart 2002 tot en met 1 maart 2006. Aangezien de budgetten na driekwart van het project nog niet tot 75% waren uitgeput, is in overweging genomen om het project met een jaar te verlengen, binnen het gestelde budget. Dit document is gebruikt als