WorldWideScience

Sample records for long-term surveillance plan

  1. Long-term surveillance plan for the Lowman, Idaho, disposal site

    International Nuclear Information System (INIS)

    1993-09-01

    The long-term surveillance plan (LTSP) for the Lowman, Idaho, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Lowman disposal cell. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This preliminary final LTSP is being submitted to the US Nuclear Regulatory Commission (NRC) as a requirement for issuance of a general license for custody and long-term care for the disposal site. The general license requires that the disposal cell be cared for in accordance with the provisions of this LTSP. The LTSP documents whether the land and interests are owned by the United States or an Indian tribe, and describes, in detail, how the long-term care of the disposal site will be carried out through the UMTRA Project long-term surveillance program. The Lowman, Idaho, LTSP is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program, (DOE, 1992)

  2. Long-term surveillance plan for the Mexican Hat Disposal Site, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1996-02-01

    This plan describes the long-term surveillance activities for the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site at Mexican Hat, Utah. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This long-term surveillance plan (LTSP) was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive material (RRM). This LTSP (based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program), documents the land ownership interests and details how the long-term care of the disposal site will be accomplished

  3. Long-term surveillance plan for the Mexican Hat disposal site, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1996-01-01

    This plan describes the long-term surveillance activities for the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site at Mexican Hat, Utah. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This long-term surveillance plan (LTSP) was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive material (RRM). This LTSPC documents the land ownership interests and details how the long-term care of the disposal site will be accomplished

  4. Long-term surveillance plan for the Green River, Utah, disposal site

    International Nuclear Information System (INIS)

    1997-06-01

    The long-term surveillance plan (LTSP) for the Green River, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Green River disposal cell. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents whether the land and interests are owned by the United States or an Indian tribe and details how the long-term care of the disposal site will be carried out. The Green River, Utah, LTSP is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  5. Long-term surveillance plan for the Shiprock Disposal site, Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The long-term surveillance plan (LTSP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Shiprock disposal cell. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents the land ownership interests and details how the long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  6. Long-term surveillance plan for the South Clive disposal site Clive, Utah

    International Nuclear Information System (INIS)

    1997-09-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project South Clive disposal site in Clive, Utah. This LSTP describes the long-term surveillance program the DOE will implement to ensure the South Clive disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  7. Long-term surveillance plan for the Collins Ranch disposal site, Lakeview, Oregon

    International Nuclear Information System (INIS)

    1994-08-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Collins Ranch disposal site, Lakeview, Oregon, describes the surveillance activities for the disposal cell. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials. This LTSP documents whether the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  8. Long-term surveillance plan for the Maybell, Colorado Disposal Site

    International Nuclear Information System (INIS)

    1997-09-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Maybell disposal site in Moffat County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Maybell disposal site. The general license becomes effective when the NRC concurs with the DOE's determination that remedial action is complete for the Maybell site and the NRC formally accepts this LTSP. This document describes the long-term surveillance program the DOE will implement to ensure the Maybell disposal site performs as designed. The program is based on site inspections to identify threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance document and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  9. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Falls City disposal site, Falls City, Texas, describes the surveillance activities for the disposal site. DOE will carry out these activities to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials. This LTSP documents whether the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  10. Long-term surveillance plan for the Collins Ranch Disposal Site, Lakeview, Oregon

    International Nuclear Information System (INIS)

    1993-12-01

    This long-term surveillance plan (LTSP) for the Lakeview, Oregon, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Lakeview (Collins Ranch) disposal cell, which will be referred to as the Collins Ranch disposal cell throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials. This LTSP documents whether the land and interests are owned by the United States or an Indian tribe, and details how the long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  11. Long-term surveillance plan for the Mexican Hat disposal site Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1997-06-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Mexican Hat, Utah, disposal site. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Mexican Hat disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  12. Long-term surveillance plan for the Estes Gulch disposal site near Rifle, Colorado

    International Nuclear Information System (INIS)

    1997-07-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Estes Gulch disposal site near Rifle, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Estes Gulch disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  13. Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-07-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney Disposal Site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  14. Long-term surveillance plan for the Canonsburg, Pennsylvania, disposal site

    International Nuclear Information System (INIS)

    1995-10-01

    This document establishes elements of the US Department of Energy's (DOE) Long-Term Surveillance Plan for the Canonsburg, Pennsylvania, disposal site. The US Nuclear Regulatory Commission (NRC) will use this plan in support of license issuance for the long-term surveillance of the Canonsburg site. The Canonsburg (CAN) site is located within the borough of Canonsburg, Washington County, in southwestern Pennsylvania. The Canonsburg site covers approximately 30 acres (74 hectares). The disposal cell contains approximately 226,000 tons (241,000 tons) of residual radioactive material (RRM). Area C is southeast of the Canonsburg site, between Strabane Avenue and Chartiers Creek. Contaminated soils were removed from Area C during the remedial action, and the area was restored with uncontaminated fill material.After this cleanup, residual quantities of thorium-230 were detected at several Area C locations. The remedial action plan did not consider the ingrowth of radium-226 from thorium-230 as part of the Area C cleanup, and only two locations contained sufficient thorium-230 concentrations to result in radium-226 concentrations slightly above the US Environmental Protection Agency (EPA) standards

  15. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This long-term surveillance plan (LTSP) for the Durango, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Durango (Bodo Canyon) disposal site, which will be referred to as the disposal site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). RRMs include tailings and other uranium ore processing wastes still at the site, which the DOE determines to be radioactive. This LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992).

  16. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado

    International Nuclear Information System (INIS)

    1994-03-01

    This long-term surveillance plan (LTSP) for the Durango, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Durango (Bodo Canyon) disposal site, which will be referred to as the disposal site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). RRMs include tailings and other uranium ore processing wastes still at the site, which the DOE determines to be radioactive. This LTSP is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992)

  17. Long-term surveillance plan for the Gunnison, Colorado disposal site

    International Nuclear Information System (INIS)

    1996-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  18. Long-term surveillance plan for the Gunnison, Colorado, disposal site

    International Nuclear Information System (INIS)

    1997-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  19. Long-term surveillance plan for the Gunnison, Colorado disposal site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

  20. Long-term surveillance plan for the Gunnison, Colorado, disposal site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

  1. Long-term surveillance plan for the Gunnison, Colorado, disposal site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

  2. Long-term surveillance plan for the Gunnison, Colorado, disposal site

    International Nuclear Information System (INIS)

    1996-05-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  3. Long-term surveillance plan for the Green River, Utah disposal site. Revision 1

    International Nuclear Information System (INIS)

    1994-08-01

    The long-term surveillance plan (LTSP) for the Green River, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Green River disposal cell. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents whether the land and interests are owned by the United States or an Indian tribe and details how the long-term care of the disposal site will be carried out. The Green River, Utah, LTSP is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  4. Long-term surveillance plan for the Burro Canyon disposal cell Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1997-08-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Burro Canyon disposal cell in San Miguel County, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Burro Canyon disposal cell performs as designed and is cared for in a manner that protects the public health and safety and the environment. The program is based on site inspections to identify threats to disposal cell integrity. Before each disposal cell is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  5. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  6. Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney disposal site. The site is in Mesa County near Grand Junction, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects public health and safety and the environment. Before each disposal site may be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Cheney disposal site. The general license becomes effective when the NRC concurs with the DOE's determination that remedial action is complete and the NRC formally accepts this plan. This document describes the long-term surveillance program the DOE will implement to ensure that the Cheney disposal site performs as designed. The program is based on site inspections to identify potential threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  7. Long-Term Surveillance and Maintenance Plan for the Gnome-Coach, New Mexico, Site

    Energy Technology Data Exchange (ETDEWEB)

    Kreie, Ken [USDOE Office of Legacy Management, Grand Junction, CO (United States); Findlay, Rick [Navarro Research and Engineering, Inc., Grand Junction, CO (United States)

    2016-06-08

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) prepared this Long-Term Surveillance and Maintenance Plan (LTSMP) for the Gnome-Coach, New Mexico, Site (the Gnome site). The Gnome site is approximately 25 miles east of Carlsbad in Eddy County, New Mexico (Figure 1). The site was the location of a 3-kiloton-yield underground nuclear test and radioisotope groundwater tracer test. The tests resulted in residual contamination and post-detonation features that require long-term oversight. Long-term responsibility for the site was transferred from the DOE National Nuclear Security Administration Nevada Site Office to LM on October 1, 2006. Responsibilities include surveillance, monitoring, and maintenance of institutional controls (ICs) as part of the long-term stewardship of the site. Long-term stewardship is designed to ensure protection of human health and the environment.

  8. Long-term surveillance plan for the Ambrosia Lake, New Mexico disposal site

    International Nuclear Information System (INIS)

    1995-11-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Ambrosia Lake disposal site in McKinley County, New Mexico, describes the US Department of Energy's (DOE) long-term care program for the disposal site. The DOE will carry out this program to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials

  9. Long-term surveillance plan for the Green River, Utah disposal site. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    The long-term surveillance plan (LTSP) for the Green River, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Green River disposal cell. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents whether the land and interests are owned by the United States or an Indian tribe and details how the long-term care of the disposal site will be carried out

  10. Long-term Surveillance Plan for the Falls City Disposal Site, Falls City, Texas. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Falls City disposal site, Falls City, Texas, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials. This LTSP documents whether the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  11. Long-term surveillance plan for the Gunnison, Colorado disposal site. Revision 2

    International Nuclear Information System (INIS)

    1997-02-01

    This long-term surveillance plan (LTSP) describes the US Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The US Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Gunnison disposal site performs as designed. The program is based on two distinct activities: (1) site inspections to identify threats to disposal cell integrity, and (2) ground water monitoring to demonstrate disposal cell performance

  12. Long-term surveillance plan for the Ambrosia Lake, New Mexico disposal site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Ambrosia Lake disposal site in McKinley County, New Mexico, describes the U.S. Department of Energy`s (DOE) long-term care program for the disposal site. The DOE will carry out this program to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials.

  13. Long-term surveillance plan for the Ambrosia Lake, New Mexico disposal site

    International Nuclear Information System (INIS)

    1996-07-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Ambrosia Lake disposal site in McKinley County, New Mexico, describes the U.S. Department of Energy's (DOE) long-term care program for the disposal site. The DOE will carry out this program to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials

  14. Long-term surveillance plan for the Shiprock disposal site, Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1993-12-01

    The long-term surveillance plan (LTSP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Shiprock disposal cell. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP is being submitted to the US Nuclear Regulatory Commission (NRC) as a requirement for issuance of a general license for custody and long-term care for the disposal site. The general license requires that the disposal cell be cared for in accordance with the provisions of this LTSP. This Shiprock, New Mexico, LTSP documents whether the land and interests are owned by the US or an Indian tribe and describes in detail the long-term care program through the UMTRA Project Office

  15. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-11-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references

  16. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references.

  17. Comment and response document for the long-term surveillance plan for the Falls City disposal site, Falls City, Texas

    International Nuclear Information System (INIS)

    1996-11-01

    This is the Comment and Response Document dated November 1996 for the Long-Term Surveillance Plan for the Falls City Disposal Site in Falls City, Texas. The site is part of the U.S. DOE's Uranium Mill Tailings Remedial Action Project (UMTRA). Several comments regarding the hydrology and surface erosion described in the Long-Term Surveillance Plan are addressed in this document

  18. Long-term surveillance plan for the South Clive Disposal Site, Clive, Utah

    International Nuclear Information System (INIS)

    1996-03-01

    This long-term surveillance plan (LTSP) describes the US Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project South Clive disposal site in Clive, Utah. The US Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CRF Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the South Clive disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the South Clive site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the South Clive disposal site performs as designed. The program's primary activity is site inspections to identify threats to disposal cell integrity

  19. Burrell, Pennsylvania, vicinty property Long-Term Surveillance Plan. Final report

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this document is to establish elements of the US Department of Energy (DOE) Long-Term Surveillance Plan (LTSP) for the Burrell, Pennsylvania, vicinity property. The US Nuclear Regulatory Commission (NRC) will use this plan to support the issuance of a license for the long-term surveillance and maintenance of the Burrell vicinity property. The DOE and the NRC previously reached agreement regarding the issuance of a license for the Burrell vicinity property. This is a departure from the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, which requires the licensing only of disposal sites, not vicinity properties. However, given the unusually large volume of wastes and the distance from the Canonsburg disposal cell of the Burrell vicinity property, it was agreed that a license for a designed disposal cell with surveillance requirements constituted a reasonable and prudent approach in keeping with the spirit of UMTRCA. The Burrell vicinity property covers approximately 29 hectares (72 acres). Disposal of the 10,500 tonnes (I 1,600 tons) of residual radioactive material (RRM) removed from the Canonsburg Uranium Mill Tailings Remedial Action (UMTRA) Project site took place within an approximately 0.6-hectare (1.6-acre) section in the western portion and an approximately 0.6-hectare (1.6-acre) section in the eastern portion of the Burrell vicinity property. The RRM was brought in as fill for under the ConRail railroad tracks. The excess RRM was placed in a storage location adjacent to the Conemaugh River at Burrell, which was later added to the disposal area. The disposal area contains a total of 78,000 tonnes (86,000 tons) of RRM

  20. Long-term surveillance plan for the Gunnison, Colorado, disposal site

    International Nuclear Information System (INIS)

    1996-05-01

    This long-term surveillance plan (LTSP) describes the US Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Gunnison disposal site in Gunnison County, Colorado. The US Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment.For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Gunnison disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Gunnison site and the NRC formally accepts this LTSP

  1. Long-term surveillance plan for the Rifle, Colorado, Disposal site

    International Nuclear Information System (INIS)

    1996-09-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Estes Gulch disposal site in Garfield County, Colorado. The U.S. Environmental Protection Agency (EPA) has developed regulations for the issuance of a general license by the U.S. Nuclear Regulatory Commission (NRC) for the custody and long-term care of UMTRA Project disposal Sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites, will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Estes Gulch disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Estes Gulch site and the NRC formally accepts this LTSP

  2. Long-term surveillance plan for the Mexican Hat disposal site Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1997-05-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Mexican Hat, Utah, disposal site. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites will be cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Mexican Hat disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the disposal site and the NRC formally accepts this LTSP. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Mexican Hat disposal site performs as designed. The program is based on two distinct types of activities: (1) site inspections to identify potential threats to disposal cell integrity, and (2) monitoring of selected seeps to observe changes in flow rates and water quality. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03. 18 refs., 6 figs., 1 tab

  3. Long-term surveillance plan for the Burro Canyon disposal cell, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1998-05-01

    This long-term surveillance plan (LTSP) describes the US Department of Energy (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Burro Canyon disposal cell in San Miguel County, Colorado. The US Nuclear Regulatory Commission (NRC) developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Burro Canyon disposal cell. The general license becomes effective when the NRC concurs with the DOE's determination that remedial action is complete at the Burro Canyon disposal cell and the NRC formally accepts this LTSP. Attachment 1 contains the concurrence letters from NRC. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Burro Canyon disposal cell performs as designed. The program is based on site inspections to identify threats to disposal cell integrity. Ground water monitoring will not be required at the Burro Canyon disposal cell because the ground water protection strategy is supplemental standards based on low yield from the uppermost aquifer

  4. Long-term surveillance plan for the Burro Canyon disposal cell, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1996-11-01

    This long-term surveillance plant (LTSP) describes the US Department of energy's (DOE) long-term care program for the Uranium Mill Tailings Remediation Action (UMTRA) Project's burro Canyon disposal cell in San Miguel County, Colorado. This LTSP describes the long-term surveillance program the DOE will implement to ensure that the Burro Canyon disposal cell performs as designed. The program is based on site inspections to identify threats to disposal cell integrity. No ground water monitoring will be required at the Burro Canyon disposal cell because the ground water protection strategy is supplemental standards based on low-yield from the upper-most aquifer

  5. Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Amchitka, Alaska, Site

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-09-01

    This Long-Term Surveillance and Maintenance Plan describes how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at the Amchitka, Alaska, Site1. Three underground nuclear tests were conducted on Amchitka Island. The U.S. Department of Defense, in conjunction with the U.S. Atomic Energy Commission (AEC), conducted the first nuclear test (Long Shot) to provide data that would improve the United States' capability of detecting underground nuclear explosions. The second nuclear test (Milrow) was a weapons-related test conducted by AEC as a means to study the feasibility of detonating a much larger device. The final nuclear test (Cannikin), the largest United States underground test, was a weapons-related test. Surface disturbances associated with these tests have been remediated. However, radioactivity remains deep below the surface, contained in and around the test cavities, for which no feasible remediation technology has been identified. In 2006, the groundwater model (Hassan et al. 2002) was updated using 2005 data collected by the Consortium for Risk Evaluation with Stakeholder Participation. Model simulation results indicate there is no breakthrough or seepage of radionuclides into the marine environment within 2,000 years. The Amchitka conceptual model is reasonable; the flow and transport simulation is based on the best available information and data. The simulation results are a quantitative prediction supported by the best available science and technology. This Long-Term Surveillance and Maintenance Plan is an additional step intended for the protection of human health and the environment. This plan may be modified from time to time in the future consistent with the mission to protect human health

  6. Guidance for implementing the UMTRA Project long-term surveillance program

    International Nuclear Information System (INIS)

    1992-09-01

    The US Nuclear Regulatory Commission (NRC) has issued a general license for the custody and long-term care of US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project permanent disposal sites. The purpose of this general license is to ensure that the UMTRA disposal sites will be cared for in such a manner as to protect the public health and safety and the environment upon completion of remedial actions. The general license will be in effect for a disposal site when NRC accepts the disposal site long-term surveillance plan (LTSP) that meets the requirements of 10 CFR 40.27. The site LTSP describes in detail the long-term surveillance program, including any monitoring, maintenance, and emergency measures necessary to fulfill the conditions of the general license. This guidance document provides (1) instructions for preparing the disposal site LTSPs and (2) instructions for carrying out the UMTRA Project long-term surveillance program, including any monitoring that may be required. The information provided in this document also is in accordance with the regulatory requirements set forth in 40 CFR 192. On January 5, 1985, the US Tenth Circuit Court of Appeals remanded the groundwater standards, 40 CFR 192.02. Proposed groundwater standards were issued for comment on September 24, 1987 (52 FR 3600). When the groundwater standards become final, this document will be revised, as appropriate. This document also will be updated in response to any changes to 10 CFR 40, or in response to changes in the manner in which the long-term care of the licensed disposal sites is carried out

  7. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    International Nuclear Information System (INIS)

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclear Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1

  8. Comment and response document for the long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado, Revision 0

    International Nuclear Information System (INIS)

    1995-11-01

    This report contains the comment and response document for the Draft Long-Term Surveillance Plan of the Bodo Canyon Site in Durango, California. This is a part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. Questions and comments regarding specific sections or statements in the report are described and then a response to each review comment or question is provided

  9. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  10. Adapting Advances in Remediation Science to Long-Term Surveillance

    International Nuclear Information System (INIS)

    Peterson, D.M.

    2006-01-01

    Several facets of groundwater remediation stand to gain from the advances made during recent years in disciplines that contribute to remediation science. Engineered remedies designed to aggressively remove subsurface contamination should benefit from this progress, and more passive cleanup methods and the long-term monitoring of such passive approaches may benefit equally well if not more. The U.S. Department of Energy Office of Legacy Management (LM) has adopted a strategic plan that is designed to take advantage of technological improvements in the monitoring and assessment of both active and passive groundwater remedies. Flexible adaptation of new technologies, as they become available, to long-term surveillance at LM sites is expected to reduce site stewardship costs while ensuring the future protection of human health and the environment. Some of the technologies are expected to come from government initiatives that focus on the needs of subsurface monitoring. Additional progress in monitoring science will likely result from continual improvements in our understanding of contaminant fate-and-transport processes in groundwater and the vadose zone. (authors)

  11. Adapting Advances in Remediation Science to Long-Term Surveillance

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, Dave [S.M. Stoller Corporation

    2006-03-01

    Several facets of groundwater remediation stand to gain from the advances made during recent years in disciplines that contribute to remediation science. Engineered remedies designed to aggressively remove subsurface contamination should benefit from this progress, and more passive cleanup methods and the long-term monitoring of such passive approaches may benefit equally well if not more. The U.S. Department of Energy Office of Legacy Management (LM) has adopted a strategic plan that is designed to take advantage of technological improvements in the monitoring and assessment of both active and passive groundwater remedies. Flexible adaptation of new technologies, as they become available, to long-term surveillance at LM sites is expected to reduce site stewardship costs while ensuring the future protection of human health and the environment. Some of the technologies are expected to come from government initiatives that focus on the needs of subsurface monitoring. Additional progress in monitoring science will likely result from continual improvements in our understanding of contaminant fate-and-transport processes in the groundwater and the vadose zone.

  12. Strategic Planning and the Long-term R&D Plan

    International Nuclear Information System (INIS)

    Cooley, J.

    2015-01-01

    The Department of Safeguards of the International Atomic Energy Agency implements a structured strategic planning process to ensure that safeguards will continue to be both effective and efficient in the future. This process provides the Department with a comprehensive and coherent planning framework for the short (2 years), medium (6 years) and long (12 years) term. The Department's suite of planning documents includes a long-term strategic plan and an associated long-term research and development plan as well as a biennial development and implementation support programme. The Department's Long-Term Strategic Plan 2012-2023 addresses the conceptual framework for safeguards implementation, legal authority, technical capabilities (expertise, equipment and infrastructure) and the human and financial resources necessary for Agency verification activities. As research and development (R&D) are essential to meet the safeguards needs of the future, the Department-s Long-Term R&D Plan 2012-2023 is designed to support the Long-Term Strategic Plan 2012-2023 by setting out the capabilities that the Department needs to achieve its strategic objectives, and key milestones towards achieving those capabilities for which Member State R&D support is needed. The Long-Term R&D Plan 2012-2023 addresses the Department's R&D requirements in areas such as safeguards concepts and approaches; detection of undeclared nuclear material and activities; safeguards equipment and communication; information technology, collection, analysis and security; analytical services; new mandates; and training. Long-term capabilities discussed in the presentation include deployed systems (e.g., equipment at facilities); analytical (e.g., sample analysis), operational (e.g., staff expertise and skills) and readiness (e.g., safeguarding new types of facilities) capabilities. To address near-term development objectives and support the implementation of its verification activities as well as to

  13. A Long-term Plan for Kalk

    DEFF Research Database (Denmark)

    2017-01-01

    In this case, the author demonstrates together with the owner-manager of KALK A/S, Mr Rasmus Jorgensen, how to use the Family Business Map to frame a constructive discussion about long-term planning. The Family Business Map is a tool for long-term planning in family firms developed by Professor...

  14. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The need for ground water monitoring at the Falls City disposal site was evaluated in accordance with NRC regulations and guidelines established by the DOE in Guidance for Implementing the Long-term Surveillance Program for UMTRA Project Title 1 Disposal Sites (DOE, 1996). Based on evaluation of site characterization data, it has been determined that a program to monitor ground water for demonstration of disposal cell performance based on a set of concentration limits is not appropriate because ground water in the uppermost aquifer is of limited use, and a narrative supplemental standard has been applied to the site that does not include numerical concentration limits or a point of compliance. The limited use designation is based on the fact that ground water in the uppermost aquifer is not currently or potentially a source of drinking water in the area because it contains widespread ambient contamination that cannot be cleaned up using methods reasonably employed by public water supply systems. Background ground water quality varies by orders of magnitude since the aquifer is in an area of redistribution of uranium mineralization derived from ore bodies. The DOE plans to perform post-closure ground water monitoring in the uppermost aquifer as a best management practice (BMP) as requested by the state of Texas.

  15. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas. Revision 2

    International Nuclear Information System (INIS)

    1996-11-01

    The need for ground water monitoring at the Falls City disposal site was evaluated in accordance with NRC regulations and guidelines established by the DOE in Guidance for Implementing the Long-term Surveillance Program for UMTRA Project Title 1 Disposal Sites (DOE, 1996). Based on evaluation of site characterization data, it has been determined that a program to monitor ground water for demonstration of disposal cell performance based on a set of concentration limits is not appropriate because ground water in the uppermost aquifer is of limited use, and a narrative supplemental standard has been applied to the site that does not include numerical concentration limits or a point of compliance. The limited use designation is based on the fact that ground water in the uppermost aquifer is not currently or potentially a source of drinking water in the area because it contains widespread ambient contamination that cannot be cleaned up using methods reasonably employed by public water supply systems. Background ground water quality varies by orders of magnitude since the aquifer is in an area of redistribution of uranium mineralization derived from ore bodies. The DOE plans to perform post-closure ground water monitoring in the uppermost aquifer as a best management practice (BMP) as requested by the state of Texas

  16. Long term planning for wind energy development

    International Nuclear Information System (INIS)

    Trinick, M.

    1995-01-01

    In a planning system intended to be governed primarily by policies in statutory plans a reasonable horizon for long term planning is 10 years or longer. Because of statutory requirements, developers have no option but to pay due regard to, and take a full part in, long term planning. The paper examines the type of policies which have emerged in the last few years to cater for wind energy development. It canvasses the merits of different types of policies. Finally, it discusses the policy framework which may emerge to cater for development outside NFFO. (Author)

  17. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    International Nuclear Information System (INIS)

    T. Haney R. VanHorn

    2007-01-01

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used to determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality

  18. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    Energy Technology Data Exchange (ETDEWEB)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.

  19. Animal Health Surveillance in Scotland in 2030: Using Scenario Planning to Develop Strategies in the Context of "Brexit".

    Science.gov (United States)

    Boden, Lisa A; Auty, Harriet; Reeves, Aaron; Rydevik, Gustaf; Bessell, Paul; McKendrick, Iain J

    2017-01-01

    Animal health surveillance is necessary to protect human and animal health, rural economies, and the environment from the consequences of large-scale disease outbreaks. In Scotland, since the Kinnaird review in 2011, efforts have been made to engage with stakeholders to ensure that the strategic goals of surveillance are better aligned with the needs of the end-users and other beneficiaries. The aims of this study were to engage with Scottish surveillance stakeholders and multidisciplinary experts to inform the future long-term strategy for animal health surveillance in Scotland. In this paper, we describe the use of scenario planning as an effective tool for the creation and exploration of five plausible long-term futures; we describe prioritization of critical drivers of change (i.e., international trade policy, data-sharing philosophies, and public versus private resourcing of surveillance capacity) that will unpredictably influence the future implementation of animal health surveillance activities. We present 10 participant-developed strategies to support 3 long-term visions to improve future resilience of animal health surveillance and contingency planning for animal and zoonotic disease outbreaks in Scotland. In the absence of any certainty about the nature of post-Brexit trade agreements for agriculture, participants considered the best investments for long-term resilience to include data collection strategies to improve animal health benchmarking, user-benefit strategies to improve digital literacy in farming communities, and investment strategies to increase veterinary and scientific research capacity in rural areas. This is the first scenario planning study to explore stakeholder beliefs and perceptions about important environmental, technological, societal, political, and legal drivers (in addition to epidemiological "risk factors") and effective strategies to manage future uncertainties for both the Scottish livestock industry and animal health

  20. Samish Indian Nation Long-Term Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Christine Woodward; B. Beckley; K. Hagen

    2005-06-30

    The Tribes strategic energy planning effort is divided into three phases: (1) Completing an Energy Resource Assessment; (2) Developing a Long-Term Strategic Energy Plan; and (3) Preparing a Strategic Energy Implementation Plan for the Samish Homelands. The Samish Indian Nation developed a comprehensive Strategic Energy plan to set policy for future development on tribal land that consists of a long-term, integrated, systems approach to providing a framework under which the Samish Community can use resources efficiently, create energy-efficient infrastructures, and protect and enhance quality of life. Development of the Strategic Energy plan will help the Samish Nation create a healthy community that will sustain current and future generations by addressing economic, environmental, and social issues while respecting the Samish Indian Nation culture and traditions.

  1. Animal Health Surveillance in Scotland in 2030: Using Scenario Planning to Develop Strategies in the Context of “Brexit”

    Directory of Open Access Journals (Sweden)

    Lisa A. Boden

    2017-11-01

    Full Text Available Animal health surveillance is necessary to protect human and animal health, rural economies, and the environment from the consequences of large-scale disease outbreaks. In Scotland, since the Kinnaird review in 2011, efforts have been made to engage with stakeholders to ensure that the strategic goals of surveillance are better aligned with the needs of the end-users and other beneficiaries. The aims of this study were to engage with Scottish surveillance stakeholders and multidisciplinary experts to inform the future long-term strategy for animal health surveillance in Scotland. In this paper, we describe the use of scenario planning as an effective tool for the creation and exploration of five plausible long-term futures; we describe prioritization of critical drivers of change (i.e., international trade policy, data-sharing philosophies, and public versus private resourcing of surveillance capacity that will unpredictably influence the future implementation of animal health surveillance activities. We present 10 participant-developed strategies to support 3 long-term visions to improve future resilience of animal health surveillance and contingency planning for animal and zoonotic disease outbreaks in Scotland. In the absence of any certainty about the nature of post-Brexit trade agreements for agriculture, participants considered the best investments for long-term resilience to include data collection strategies to improve animal health benchmarking, user-benefit strategies to improve digital literacy in farming communities, and investment strategies to increase veterinary and scientific research capacity in rural areas. This is the first scenario planning study to explore stakeholder beliefs and perceptions about important environmental, technological, societal, political, and legal drivers (in addition to epidemiological “risk factors” and effective strategies to manage future uncertainties for both the Scottish livestock industry and

  2. Animal Health Surveillance in Scotland in 2030: Using Scenario Planning to Develop Strategies in the Context of “Brexit”

    Science.gov (United States)

    Boden, Lisa A.; Auty, Harriet; Reeves, Aaron; Rydevik, Gustaf; Bessell, Paul; McKendrick, Iain J.

    2017-01-01

    Animal health surveillance is necessary to protect human and animal health, rural economies, and the environment from the consequences of large-scale disease outbreaks. In Scotland, since the Kinnaird review in 2011, efforts have been made to engage with stakeholders to ensure that the strategic goals of surveillance are better aligned with the needs of the end-users and other beneficiaries. The aims of this study were to engage with Scottish surveillance stakeholders and multidisciplinary experts to inform the future long-term strategy for animal health surveillance in Scotland. In this paper, we describe the use of scenario planning as an effective tool for the creation and exploration of five plausible long-term futures; we describe prioritization of critical drivers of change (i.e., international trade policy, data-sharing philosophies, and public versus private resourcing of surveillance capacity) that will unpredictably influence the future implementation of animal health surveillance activities. We present 10 participant-developed strategies to support 3 long-term visions to improve future resilience of animal health surveillance and contingency planning for animal and zoonotic disease outbreaks in Scotland. In the absence of any certainty about the nature of post-Brexit trade agreements for agriculture, participants considered the best investments for long-term resilience to include data collection strategies to improve animal health benchmarking, user-benefit strategies to improve digital literacy in farming communities, and investment strategies to increase veterinary and scientific research capacity in rural areas. This is the first scenario planning study to explore stakeholder beliefs and perceptions about important environmental, technological, societal, political, and legal drivers (in addition to epidemiological “risk factors”) and effective strategies to manage future uncertainties for both the Scottish livestock industry and animal health

  3. The uranium industry: long-term planning for short-term competition

    International Nuclear Information System (INIS)

    Vottero, X.; Georges Capus, G.

    2001-01-01

    Long term planning for short term competition Today, uranium producers face new challenges in terms of both production (new regulatory, environmental and social constraints) and market conditions (new sources of uranium supply, very low prices and tough competition). In such a context, long-term planning is not just a prerequisite to survive in the nuclear fuel cycle industry. In fact, it also contributes to sustaining nuclear electricity generation facing fierce competition from other energy sources in increasingly deregulated markets. Firstly, the risk of investing in new mining projects in western countries is growing because, on the one hand, of very erratic market conditions and, on the other hand, of increasingly lengthy, complex and unpredictable regulatory conditions. Secondly, the supply of other sources of uranium (uranium derived from nuclear weapons, uranium produced in CIS countries, ...) involve other risks, mainly related to politics and commercial restrictions. Consequently, competitive uranium supply requires not only technical competence but also financial strength and good marketing capabilities in order to anticipate long-term market trends, in terms of both demand and supply. It also requires taking into account new parameters such as politics, environment, regulations, etc. Today, a supplier dedicated to the sustainable production of nuclear electricity must manage a broad range of long-term risks inherent to the procurement of uranium. Taking into account all these parameters in a context of short-term, fast-changing market is a great challenge for the future generation. World Uranium Civilian Supply and Demand. (authors)

  4. Endovascular Aneurysm Repair: Is Imaging Surveillance Robust, and Does It Influence Long-term Mortality?

    Energy Technology Data Exchange (ETDEWEB)

    Waduud, Mohammed Abdul, E-mail: m.a.waduud@doctors.org.uk [Glasgow Royal Infirmary, Department of Surgery (United Kingdom); Choong, Wen Ling, E-mail: wenlingchoong@nhs.net [Aberdeen Royal Infirmary, NHS Grampian, Department of Surgery (United Kingdom); Ritchie, Moira, E-mail: moirasim9@gmail.com; Williams, Claire, E-mail: c.williams.3@research.gla.ac.uk [University of Glasgow, Institute of Health and Wellbeing Glasgow (United Kingdom); Yadavali, Reddi, E-mail: reddi.yadavali@nhs.net [Aberdeen Royal Infirmary, NHS Grampian, Department of Radiology (United Kingdom); Lim, Shueh, E-mail: s.lim.06@aberdeen.ac.uk [Royal Infirmary of Edinburgh, NHS Lothian, Department of Radiology (United Kingdom); Buchanan, Fraser, E-mail: f.buchanan.11@aberdeen.ac.uk [University of Aberdeen, The School of Medicine and Dentistry (United Kingdom); Bhat, Raj, E-mail: raj.bhat@nhs.net [Ninewells Hospital, NHS Tayside, Department of Radiology (United Kingdom); Ramanathan, Krishnappan, E-mail: k.ramanathan@dundee.ac.uk [University of Dundee, School of Medicine (United Kingdom); Ingram, Susan, E-mail: susan.ingram@luht.scot.nhs.uk; Cormack, Laura, E-mail: lgcormack@googlemail.com [Royal Infirmary of Edinburgh, NHS Lothian, Department of Radiology (United Kingdom); Moss, Jonathan G., E-mail: jon.moss@ggc.scot.nhs.uk [Gartnavel General Hospital, Department of Radiology (United Kingdom)

    2015-02-15

    PurposeEndovascular aneurysm repair (EVAR) is the dominant treatment strategy for abdominal aortic aneurysms. However, as a result of uncertainty regarding long-term durability, an ongoing imaging surveillance program is required. The aim of the study was to assess EVAR surveillance in Scotland and its effect on all-cause and aneurysm-related mortality.MethodsA retrospective analysis of all EVAR procedures carried out in the four main Scottish vascular units. The primary outcome measure was the implementation of post-EVAR imaging surveillance across Scotland. Patients were identified locally and then categorized as having complete, incomplete, or no surveillance. Secondary outcome measures were all-cause mortality and aneurysm-related mortality. Cause of death was obtained from death certificates.ResultsData were available for 569 patients from the years 2001 to 2012. All centers had data for a minimum of 5 contiguous years. Surveillance ranged from 1.66 to 4.55 years (median 3.03 years). Overall, 53 % had complete imaging surveillance, 43 % incomplete, and 4 % none. For the whole cohort, all-cause 5-year mortality was 33.5 % (95 % confidence interval 28.0–38.6) and aneurysm-related mortality was 4.5 % (.8–7.3). All-cause mortality in patients with complete, incomplete, and no imaging was 49.9 % (39.2–58.6), 19.1 % (12.6–25.2), and 47.2 % (17.7–66.2), respectively. Aneurysm-related mortality was 3.7 % (1.8–7.4), 4.4 % (2.2–8.9), and 9.5 % (2.5–33.0), respectively. All-cause mortality was significantly higher in patients with complete compared to incomplete imaging surveillance (p < 0.001). No significant differences were observed in aneurysm-related mortality (p = 0.2).ConclusionOnly half of EVAR patients underwent complete long-term imaging surveillance. However, incomplete imaging could not be linked to any increase in mortality. Further work is required to establish the role and deliverability of EVAR imaging surveillance.

  5. Long-Term Planning in Restructured Power Systems

    International Nuclear Information System (INIS)

    Botterud, Audun

    2003-01-01

    This thesis describes the development of three decision support models for long-term investment planning in restructured power systems. The model concepts address the changing conditions for the electric power industry, with the introduction of more competitive markets, higher uncertainty and less centralised planning. Under these circumstances there is an emerging need for new planning models, also for analyses of the power system in a long-term perspective. The thesis focuses particularly on how dynamic and stochastic modelling can contribute to the improvement of decision making in a restructured power industry. We argue that the use of such modelling approaches has become more important after the introduction of competitive power markets, due to the participants' increased exposure to price fluctuations and economic risk. Our models can be applied by individual participants in the power system to evaluate investment projects for new power generation capacity. The models can also serve as a decision support tool on a regulatory level, providing analyses of the long-term performance of the power system under different regulations and market designs. In Chapter 1, we give a brief introduction to the ongoing development towards restructuring and liberalisation of the electrical power system. A discussion of the operation and organisation of restructured power systems is also provided. In Chapter 2, we look more specifically at different modelling approaches for expansion planning in electrical power systems. We also discuss how the contributions in this thesis compare to previous work in the field of decision support models for long-term planning in both regulated and competitive power systems. In Chapter 3, we develop a power market simulation model based on system dynamics. The advantages and limitations of using descriptive system dynamics models for long-term planning purposes in this context are also discussed. Chapter 4 is devoted to a novel optimisation

  6. Long-term care: a substantive factor in financial planning.

    Science.gov (United States)

    Willis, D A

    2000-01-01

    More than 50 percent of women will enter a nursing home at some point in their lives. About one-third of men living to age 65 will also need nursing home care. Planning for long-term care is even more important since Medicare covers very little of the cost of such care. The Indiana Partnership Plan is one program designed to help fund the long-term care costs while allowing individuals protect other financial assets.

  7. Long term plan of atomic energy development and utilization

    International Nuclear Information System (INIS)

    1982-01-01

    The atomic energy utilization and development in Japan have progressed remarkably, and already nuclear power generation has borne an important part in electric power supply, while radiation has been utilized in the fields of industry, agriculture, medicine and so on. Now, atomic energy is indispensable for national life and industrial activity. The former long term plan was decided in September, 1978, and the new long term plan should be established since the situation has changed largely. The energy substituting for petroleum has been demanded, and the expectation to nuclear power generation has heightened because it enables stable and economical power supply. The independently developed technology related to atomic energy must be put in practical use. The peaceful utilization of atomic energy must be promoted, while contributing to the nuclear non-proliferation policy. The Atomic Energy Commission of Japan decided the new long term plan to clearly show the outline of the important measures related to atomic energy development and utilization in 10 years hereafter, and the method of its promotion. The basic concept of atomic energy development and utilization, the long term prospect and the concept on the promotion, the method of promoting the development and utilization, and the problems of funds, engineers and location are described. (kako, I.)

  8. Emergency planning and long-term care: least paid, least powerful, most responsible.

    Science.gov (United States)

    Covan, Eleanor Krassen; Fugate-Whitlock, Elizabeth

    2010-11-01

    As disasters can occur anywhere, planning to avoid emergencies is an international concern. Our research specifically addresses planning for the needs and safety of a vulnerable population, long-term care residents. Our initial purposes in this evaluation research were to assess the utility of a template to gather emergency management information for individual long-term care communities, to report on how prepared they are to cope with emergencies that have occurred elsewhere in areas like ours, and to assess the effectiveness of employing gerontology students in the planning process. As we began analyzing our data, we realized that it is imperative to consider whether it is possible for long-term care communities to respond effectively to disasters. In our findings we focus on the impact of gender in the planning process, the importance of size with regard to template utility, the positive and negative consequences of student aid, and the fact that gathering plans for individual long-term care communities may have detracted from collaborative community planning.

  9. Long Term Storage with Surveillance of Canadian Prototype Nuclear Power Reactors

    International Nuclear Information System (INIS)

    Janzen, Rick

    2008-01-01

    Atomic Energy of Canada (AECL) was originally formed by the government of Canada in 1952 to perform research in radiation and nuclear areas. In the mid 1950's Canada decided to limit itself to peaceful uses of nuclear energy and AECL embarked on several research and development programs, one of them being the development of nuclear power plants. This led to the development of the CANDU TM design of heavy water power reactors, of which there are now 29 operating around the world. This presentation discusses the present state of the first two CANDU TM prototype reactors and a prototype boiling light water reactor and lessons learnt after being in a long-term storage with surveillance state for more than 20 years. AECL facilities undergo decommissioning by either a prompt or a deferred removal approach. Both approaches are initiated after an operating facility has been declared redundant and gone through final operational shutdown. For the deferred approach, initial decommissioning activities are performed to put the facility into a sustainable, safe, shutdown state to minimize the hazards and costs of the ensuing extended storage with surveillance (SWS) or Safestor phase. At the appropriate time, the facility is dismantled and removed, or put into a suitable condition for re-use. AECL has a number of facilities that were built during its history, and some of these are now redundant or will become redundant in the near future. The deferred removal approach is part of AECL's decommissioning strategy for several reasons: 1. Reduction in radiation doses to workers during the final dismantling, 2. No facilities are available yet in Canada for the management of quantity of wastes arising from decommissioning, 3. Financial constraints presented by the number of facilities that will undergo decommissioning, compared to the availability of funds to carry out the work. This has led to the development of a comprehensive decommissioning plan that includes all of AECL's redundant

  10. 2003 Long-Term Surveillance and Maintenance Program Report

    International Nuclear Information System (INIS)

    2004-01-01

    are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE's responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation's nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE's legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM-50), as well as management of remedies involving ground water and surface water contaminated by former processing activities

  11. 2003 Long-Term Surveillance and Maintenance Program Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-07-01

    are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

  12. Practical implications for RPV irradiation surveillance under long term operation based on latest research results

    International Nuclear Information System (INIS)

    Hein, H.; Keim, E.; Barthelmes, J.; Schnabel, H.

    2015-01-01

    The international programs CARISMA, CARINA and LONGLIFE belong to the research programs which have been performed during the last 10 years to study the irradiation behavior of RPV steels under long term operation of more than 60 years. Some characteristic but different irradiated RPV steels used in Pressurized Water Reactors have been extensively investigated in each of those three programs. Whereas the CARISMA and CARINA programs were mainly focused on material testing to study the irradiation-induced change of material properties in terms of fracture toughness, the main objective of LONGLIFE was to investigate the change of microstructure with various analysis techniques and to understand the mechanisms behind. In this way it was possible to get a comprehensive material characterization in terms of macro-physical properties and micro-structural features for a number of RPV steels which have been studied at different irradiation levels up to 8*10 19 cm -2 (E > 1 MeV). The essential macro-physical and micro-structural results are summarized, in particular regarding the impact of copper and nickel, and the neutron flux on the irradiation behavior and with respect to possible late irradiation effects under long term operation. Moreover, the change of material properties is linked with embrittlement mechanisms such as formation of element specific precipitations, segregations, and matrix defects. Well-known trend curves are also applied to the measured T 41 and T 0 data in order to assess their appropriateness for long term operation. Based on the comprehensive available data base, practical implications for RPV irradiation surveillance programs under long term operation are highlighted with respect to issues like material specific application of reference temperature concepts, data scattering, prediction of high fluence behavior and how to cope with possible late irradiation effects. Finally, best practices for RPV irradiation surveillance programs are suggested from

  13. Long-term capital planning considering nuclear plant life-cycle management

    International Nuclear Information System (INIS)

    Negin, C.A.; Simpson, J.M.; Hostetler, D.R.

    1992-09-01

    The creation of a Life Cycle Management (LCM) group at utilities to evaluate the long term capital refurbishment needs is gaining favor. Among the functions of such groups can be the responsibility for recommending long term capital planning projects based on results of evaluations of systems, structures, and components that are not only essential to achieving the full current license term of operation, but also to extend the service life of the plant. Making such recommendations, in content and timing, requires the ability to view all recommendations in the context of an overall capital budget and long range outage impacts. This report illustrates an approach for creating a Long-Term Capital Plan with methods for deciding on, compiling, integrating, and presenting projects from the perspective of an LCM program for a nuclear power plant. It also addresses a rationale for capitalization of LCM program activities that would not be allowed under current accounting treatment

  14. The uranium industry: long term planning for short term competition

    International Nuclear Information System (INIS)

    Vottero, X.

    2000-01-01

    Today, uranium producers face new challenges in terms of both production (new regulatory, environmental and social constraints) and market conditions (new sources of uranium supply, very low prices and tough competition). In such a context, long-term planning is not just a prerequisite to survive in the nuclear fuel cycle industry. In fact, it also contributes to sustaining nuclear electricity generation facing fierce competition from other energy sources in increasingly deregulated markets. (authors)

  15. Influence of long-term colonoscopic surveillance on incidence of colorectal cancer and death from the disease in patients with precursors (adenomas)

    DEFF Research Database (Denmark)

    Jørgensen, Ole Dan; Kronborg, Ole; Fenger, Claus

    2007-01-01

    Case-control studies and short term prospective studies have suggested that selected groups of patients with precursors of colorectal cancer may benefit from colonoscopic surveillance after initial removal of adenomas. The aim of the present study was to demonstrate such a possible benefit from...... long term (1-24 years) colonoscopic surveillance in a population of patients with all types of adenomas regardless of size and way of removal. Two thousand and forty-one patients with a first time diagnosis of colorectal adenoma were included in prospective surveillance between year 1978 and 2002. All...

  16. An overview of Ontario's 2013 long term energy plan

    International Nuclear Information System (INIS)

    Jobe, C.

    2014-01-01

    Ontario's 2013 Long Term Energy /Plan (LTEP) takes a pragmatic approach. The plan is designed to balance the following five principles namely: Cost effectiveness, Reliability, Clean energy, Community engagement, and Emphasis on conservation and demand management before building new generation. By taking a pragmatic and flexible approach and balancing these principles, Ontario's 2013 Long Term Energy Plan builds on the foundation laid by the 2010 LTEP while also lowering the projected total system costs. The key elements of the 2013 LTEP are described in this paper by highlighting the major features of these elements. (author)

  17. Experiences of care planning in England: interviews with patients with long term conditions

    Directory of Open Access Journals (Sweden)

    Newbould Jenny

    2012-07-01

    Full Text Available Abstract Background The prevalence and impact of long term conditions continues to rise. Care planning for people with long term conditions has been a policy priority in England for chronic disease management. However, it is not clear how care planning is currently understood, translated and implemented in primary care. This study explores experience of care planning in patients with long term conditions in three areas in England. Methods We conducted semi-structured interviews with 23 predominantly elderly patients with multiple long term conditions. The interviews were designed to explore variations in and emergent experiences of care planning. Qualitative analysis of interview transcripts involved reflexively coding and re-coding data into categories and themes. Results No participants reported experiencing explicit care planning discussions or receiving written documentation setting out a negotiated care plan and they were unfamiliar with the term ‘care planning’. However, most described some components of care planning which occurred over a number of contacts with health care professionals which we term”reactive” care planning. Here, key elements of care planning including goal setting and action planning were rare. Additionally, poor continuity and coordination of care, lack of time in consultations, and patient concerns about what was legitimate to discuss with the doctor were described. Conclusions Amongst this population, elements of care planning were present in their accounts, but a structured, comprehensive process and consequent written record (as outlined in English Department of Health policy was not evident. Further research needs to explore the advantages and disadvantages of different approaches to care planning for different patient groups.

  18. Long-term energy planning with uncertain environmental performance metrics

    International Nuclear Information System (INIS)

    Parkinson, Simon C.; Djilali, Ned

    2015-01-01

    Highlights: • Environmental performance uncertainty considered in a long-term energy planning model. • Application to electricity generation planning in British Columbia. • Interactions with climate change mitigation and adaptation strategy are assessed. • Performance risk-hedging impacts the technology investment strategy. • Sensitivity of results to model formulation is discussed. - Abstract: Environmental performance (EP) uncertainties span a number of energy technology options, and pose planning risk when the energy system is subject to environmental constraints. This paper presents two approaches to integrating EP uncertainty into the long-term energy planning framework. The methodologies consider stochastic EP metrics across multiple energy technology options, and produce a development strategy that hedges against the risk of exceeding environmental targets. Both methods are compared within a case study of emission-constrained electricity generation planning in British Columbia, Canada. The analysis provides important insight into model formulation and the interactions with concurrent environmental policy uncertainties. EP risk is found to be particularly important in situations where environmental constraints become increasingly stringent. Model results indicate allocation of a modest risk premium in these situations can provide valuable hedging against EP risk

  19. Flexibility and reliability in long-term planning exercises dedicated to the electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Maizi, Nadia; Drouineau, Mathilde; Assoumou, Edi; Mazauric, Vincent

    2010-09-15

    Long-term planning models are useful to build plausible options for future energy systems and must consequently address the technological feasibility and associated cost of these options. This paper focuses on the electricity sector and on problems of flexibility and reliability in power systems in order to improve results provided by long-term planning exercises: flexibility needs are integrated as an additional criterion for new investment decisions and, reliability requirements are assessed through the level of electrical losses they induced and a related cost. These approaches are implemented in a long-term planning model and demonstrated through a study of the Reunion Island.

  20. Los Alamos National Laboratory SAVY-4000 Field Surveillance Plan Update for 2016

    International Nuclear Information System (INIS)

    Kelly, Elizabeth J.; Stone, Timothy Amos; Smith, Paul Herrick; Prochnow, David Adrian; Weis, Eric M.

    2016-01-01

    developing the technical basis for a 40-year design life. The technical basis for the longer design life will be developed based on the results of this surveillance plan and the concurrent lifetime extension studies (Blair et al. 2012, Weis et al. 2015a). A long-term surveillance plan will be developed by the completion of this plan and will be based on the results of the first several years of this five-year surveillance plan and the lifetime extension studies. In addition, the current Hagan container population is so large (approximately 3,500 LANL-wide, approximately 3,000 in PF-4) that it is anticipated Hagan containers will be in use for many years to come. Therefore, this plan includes surveillance activities for the Hagan container system during the time it takes to replace the Hagan containers with manually-compliant containers such as the SAVY 4000. These Hagan examinations not only provide information to determine if additional Hagan surveillance is needed, but also support SAVY lifetime-extension studies because some of the container components are made from similar material (e.g., stainless steel and Viton).

  1. Long Term Planning at IQ Metal

    DEFF Research Database (Denmark)

    2017-01-01

    This is a Danish version. This case about long term planning at the owner-managed manufacturing firm IQ Metal shows how the future management and ownership may be organized to utilize owner assets and minimize roadblocks. Initially, the owner-manager Bo Fischer Larsen explains how he acquired...... a stake in 2007 in the company which at that time was named Braendstrup Maskinfabrik. He furthermore expalins how he has developed the company based on a strategic plan focusing on professionalization and outsourcing. Next, the video shows how to type Bo Fischer Larsen's replies to the questions...... in The Owner Strategy Map into the questionnaire available on www.ejerstrategi-kortet.dk. Lastly, the Owner Strategy Map's recommendation of how to organize the future management and ownership of IQ Metal is explained....

  2. What Should Stay Put? Campus Landscape Planning for the Long Term.

    Science.gov (United States)

    Yahres, Mike Van

    2000-01-01

    Discusses campus landscape long-term planning and design decision making during campus alterations and upgrades. Those campus landscape elements that tend to remain in place and planning for their continued existence are discussed. (GR)

  3. Study on mid and long-term strategic plan formulation for newly-constructed NPP

    International Nuclear Information System (INIS)

    Song Lin

    2014-01-01

    Mid and Long-term strategic plan plays a key role for the management of a newly constructed nuclear power company. Among others, process, goals, and risk management, are the primary concerns during plan preparing. The article analyzed these three areas for Fuqing NPP, including the formulating process for the plan, the mid and long-term goal setting of the company, the major risk analysis and countermeasure selection therefore. Through that solutions and suggestions for strategic plan formulation were concluded for newly-constructed NPP. (author)

  4. Intergenerational equity and long-term stewardship plans

    International Nuclear Information System (INIS)

    Hocking, E. K.

    2002-01-01

    For an untold number of contaminated sites throughout the world, stewardship will be inevitable. For many such sites, stewardship will be a reasonable approach because of the uncertainties associated with present and future site conditions and site contaminants, the limited performance of available technologies, the nonavailability of technologies, and the risk and cost associated with complete cleanup. Regardless of whether stewardship is a realistic approach to site situations or simply a convenient default, it could be required at most contaminated sites for multiple generations. Because the stewardship plan is required to protect the release of hazardous contaminants to the environment, some use restrictions will be put in place to provide that protection. These use restrictions will limit access to resources for as long as the protection is required. The intergenerational quality of long-term stewardship plans and their inherent limitations on resource use require that they be designed to achieve equity among the affected generations. Intergenerational equity, defined here as the fairness of access to resources across generations, could be achieved through a well-developed stewardship plan that provides future generations with the information they need to make wise decisions about resource use. Developing and implementing such a plan would take into account the failure mechanisms of the plan's components, feature short stewardship time blocks that would allow for periodic reassessments of the site and of the stewardship program's performance, and provide present and future generations with necessary site information

  5. Planning India's long-term energy shipment infrastructures for electricity and coal

    International Nuclear Information System (INIS)

    Bowen, Brian H.; Canchi, Devendra; Lalit, Vishal Agarwal; Preckel, Paul V.; Sparrow, F.T.; Irwin, Marty W.

    2010-01-01

    The Purdue Long-Term Electricity Trading and Capacity Expansion Planning Model simultaneously optimizes both transmission and generation capacity expansions. Most commercial electricity system planning software is limited to only transmission planning. An application of the model to India's national power grid, for 2008-2028, indicates substantial transmission expansion is the cost-effective means of meeting the needs of the nation's growing economy. An electricity demand growth rate of 4% over the 20-year planning horizon requires more than a 50% increase in the Government's forecasted transmission capacity expansion, and 8% demand growth requires more than a six-fold increase in the planned transmission capacity expansion. The model minimizes the long-term expansion costs (operational and capital) for the nation's five existing regional power grids and suggests the need for large increases in load-carrying capability between them. Changes in coal policy affect both the location of new thermal power plants and the optimal pattern inter-regional transmission expansions.

  6. Community Solutions for Stormwater Management: A Guide for Voluntary Long-Term Planning

    Science.gov (United States)

    This draft guide describes how to develop a comprehensive long-term community stormwater plan that integrates stormwater management with communities’ broader plans for economic development, infrastructure investment and environmental compliance.

  7. SAVY-4000 Field Surveillance Plan Update for 2017

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Elizabeth J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Stone, Timothy Amos [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Smith, Paul Herrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Reeves, Kirk Patrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Veirs, Douglas Kirk [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Prochnow, David Adrian [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-03-20

    The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-­1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.”This 2017 update reflects changes to the surveillance plan resulting from surveillance findings as documented in Reeves et al. 2016. These findings include observations of corrosion in SAVY and Hagan containers and the indication (in one SAVY container) of possible filter membrane thermal degradation. This surveillance plan update documents the rationale for selecting surveillance containers, specifies the containers for 2017 surveillance, and identifies a minimum set of containers for 2018 surveillance. This update contains important changes to the previous surveillance plans.

  8. Case Studies on Newly-emerging Long- and Medium-term Strategic Planning and Its Reference to Beijing

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Responding to the significant impacts brought by social, political, economic and environmental changes, some countries, regions and cities in the world have introduced new forms of long- and medium-term strategic planning since 2000, so as to promote the sustainable development of the cities or regions through a higher-level thoughts and a wider-perspective exploration. Taking America 2050, Future Ruhr 2030, New York 2030 and some other long- and medium-term strategic plans as examples, the paper analyzes the evolution of long- and medium-term strategic planning from the aspects of plan-making methods, analyzing techniques, research contents development trends etc. at the state, regional, and city levels. Based on international experience, this paper puts forward the necessity for Beijing to launch a new long-term strategic planning study "Beijing 2049." The innovation, challenges and development direction of "Beijing 2049" is also expounded in the paper.

  9. Secure surveillance of antimicrobial resistant organism colonization or infection in Ontario long term care homes.

    Directory of Open Access Journals (Sweden)

    Khaled El Emam

    Full Text Available BACKGROUND: There is stigma attached to the identification of residents carrying antimicrobial resistant organisms (ARO in long term care homes, yet there is a need to collect data about their prevalence for public health surveillance and intervention purposes. OBJECTIVE: We conducted a point prevalence study to assess ARO rates in long term care homes in Ontario using a secure data collection system. METHODS: All long term care homes in the province were asked to provide colonization or infection counts for methicillin-resistant Staphylococcus aureus (MRSA, vancomycin-resistant enterococci (VRE, and extended-spectrum beta-lactamase (ESBL as recorded in their electronic medical records, and the number of current residents. Data was collected online during the October-November 2011 period using a Paillier cryptosystem that allows computation on encrypted data. RESULTS: A provably secure data collection system was implemented. Overall, 82% of the homes in the province responded. MRSA was the most frequent ARO identified at 3 cases per 100 residents, followed by ESBL at 0.83 per 100 residents, and VRE at 0.56 per 100 residents. The microbiological findings and their distribution were consistent with available provincial laboratory data reporting test results for AROs in hospitals. CONCLUSIONS: We describe an ARO point prevalence study which demonstrated the feasibility of collecting data from long term care homes securely across the province and providing strong privacy and confidentiality assurances, while obtaining high response rates.

  10. Present state and long term planning on nuclear power plants in principal countries in the world

    International Nuclear Information System (INIS)

    Nomura, Junichi

    1978-01-01

    The situation of nuclear power stations and the long term planning in each major country in the world were summarized, but the situation is changing from time to time, therefore it is difficult to make the long term prediction. The advanced countries in terms of nuclear power established the long term plans to adopt nuclear power generation largely owing to the oil crisis, but thereafter the revision was carried out again and again in respective countries. The developing countries already started the operation of nuclear power generation occupy only 2 to 3% of the total installed capacity in the world, but the countries constructing or planning nuclear power generation are many, and if the operation will be started as scheduled, their capacity will reach 30 million kW by 1985, and occupy about 10% of the total installed capacity of nuclear power generation in the world. As for the range of investigation of this report, the countries where the long term plans are unknown or the number of construction is small, Japan, Great Britain, USA and communist countries are excluded. As a rule, the light water reactors with power output of more than 200,000 kW are listed. The number of nuclear power plants in operation, under construction and in planning stage, national situation, long term plan, and others in each country are described. (Kako, I.)

  11. Energy-Aware Path Planning for UAS Persistent Sampling and Surveillance

    Science.gov (United States)

    Shaw-Cortez, Wenceslao

    The focus of this work is to develop an energy-aware path planning algorithm that maximizes UAS endurance, while performing sampling and surveillance missions in a known, stationary wind environment. The energy-aware aspect is specifically tailored to extract energy from the wind to reduce thrust use, thereby increasing aircraft endurance. Wind energy extraction is performed by static soaring and dynamic soaring. Static soaring involves using upward wind currents to increase altitude and potential energy. Dynamic soaring involves taking advantage of wind gradients to exchange potential and kinetic energy. The path planning algorithm developed in this work uses optimization to combine these soaring trajectories with the overarching sampling and surveillance mission. The path planning algorithm uses a simplified aircraft model to tractably optimize soaring trajectories. This aircraft model is presented and along with the derivation of the equations of motion. A nonlinear program is used to create the soaring trajectories based on a given optimization problem. This optimization problem is defined using a heuristic decision tree, which defines appropriate problems given a sampling and surveillance mission and a wind model. Simulations are performed to assess the path planning algorithm. The results are used to identify properties of soaring trajectories as well as to determine what wind conditions support minimal thrust soaring. Additional results show how the path planning algorithm can be tuned between maximizing aircraft endurance and performing the sampling and surveillance mission. A means of trajectory stitching is demonstrated to show how the periodic soaring segments can be combined together to provide a full solution to an infinite/long horizon problem.

  12. Mixer pump long term operations plan for Tank 241-SY-101 mitigation

    International Nuclear Information System (INIS)

    Irwin, J.J.

    1994-01-01

    This document provides the general Operations Plan for performance of the mixer pump long term operations for Tank 241-SY-101 mitigation of gas retention and periodic release in Tank 101-SY. This operations plan will utilize a 112 kW (150 hp) mixing pump to agitate/suspend the particulates in the tank

  13. Transuranic waste: long-term planning

    International Nuclear Information System (INIS)

    Young, K.C.

    1985-07-01

    Societal concerns for the safe handling and disposal of toxic waste are behind many of the regulations and the control measures in effect today. Transuranic waste, a specific category of toxic (radioactive) waste, serves as a good example of how regulations and controls impact changes in waste processing - and vice versa. As problems would arise with waste processing, changes would be instituted. These changes improved techniques for handling and disposal of transuranic waste, reduced the risk of breached containment, and were usually linked with regulatory changes. Today, however, we face a greater public awareness of and concern for toxic waste control; thus, we must anticipate potential problems and work on resolving them before they can become real problems. System safety analyses are valuable aids in long-term planning for operations involving transuranic as well as other toxic materials. Examples of specific system safety analytical methods demonstrate how problems can be anticipated and resolution initiated in a timely manner having minimal impacts upon allocation of resource and operational goals. 7 refs., 1 fig

  14. Artificial intelligence for the EChO long-term mission planning tool

    Science.gov (United States)

    García-Piquer, Álvaro; Ribas, Ignasi; Colomé, Josep

    2014-08-01

    The Exoplanet Characterisation Observatory (EChO) was an ESA mission candidate competing for a launch opportunity within the M3 call. Its main aim was to carry out research on the physics and chemistry of atmospheres of transiting planets. This requires the observation of two types of events: primary and secondary eclipses. The events of each exoplanet have to be observed several times in order to obtain measurements with adequate Signal-to-Noise Ratio. Furthermore, several criteria must be considered to perform an observation, among which we can highlight the exoplanet visibility, its event duration, and the avoidance of overlapping with other tasks. It is important to emphasize that, since the communications for transferring data from ground stations to the spacecraft are restricted, it is necessary to compute a long-term plan of observations in order to provide autonomy to the observatory. Thus, a suitable mission plan will increase the efficiency of telescope operation, and this will result in a raise of the scientific return and a reduction of operational costs. Obtaining a long-term mission plan becomes unaffordable for human planners due to the complexity of computing the large amount of possible combinations for finding a near-optimal solution. In this contribution we present a long-term mission planning tool based on Genetic Algorithms, which are focused on solving optimization problems such as the planning of several tasks. Specifically, the proposed tool finds a solution that highly optimizes the objectives defined, which are based on the maximization of the time spent on scientific observations and the scientific return (e.g., the coverage of the mission survey). The results obtained on the large experimental set up support that the proposed scheduler technology is robust and can function in a variety of scenarios, offering a competitive performance which does not depend on the collection of objects to be observed. Finally, it is noteworthy that the

  15. Long-Term Surveillance and Maintenance Records: Maintaining Access to the Knowledge - 13122

    International Nuclear Information System (INIS)

    Montgomery, John; Gueretta, Jeanie; McKinney, Ruth; Anglim, Cliff

    2013-01-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is an integral part of DOE's strategy to ensure that legacy liabilities of former nuclear weapons production sites are properly managed following the completion of environmental cleanup activities. In the area of environmental legacy management, records management is crucial to the protection of health, environmental, and legal interests of the Department and the public. LM is responsible for maintaining long-term surveillance and maintenance (LTS and M) records in performance of its mission. Maintaining access to the knowledge contained in these record collections is one of LM's primary responsibilities. To fulfill this responsibility, LM established a consolidated records management facility, the LM Business Center (LMBC), to house physical media records and electronic records. A new electronic record keeping system (ERKS) was needed to replace an obsolete system while helping to ensure LM is able to meet ongoing responsibilities to maintain access to knowledge and control the life cycle management of records. (authors)

  16. Surveillance mission planning for UAVs in GPS-denied urban environment

    Science.gov (United States)

    Pengfei, Wang

    In this thesis, the issues involved in the mission planning of UAVs for city surveillance have been studied. In this thesis, the research includes two major parts. Firstly, a mission planning system is developed that generates mission plans for a group of fixed-wing UAVs with on-board gimballed cameras to provide continuous surveillance over an urban area. Secondly, the problem of perching location selection (as part of perch-and-stare surveillance mission) for rotary-wing UAVs in a GPS-denied environment is studied. In this kind of mission, a UAV is dispatched to perch on a roof of a building to keep surveillance on a given target. The proposed algorithms to UAV surveillance mission planning (fixed-wing and rotary-wing) have been implemented and tested. It represents an important step towards achieving autonomous planning in UAV surveillance missions.

  17. Long-term post-marketing surveillance of mizoribine for the treatment of lupus nephritis: Safety and efficacy during a 3-year follow-up

    Directory of Open Access Journals (Sweden)

    Nobuyuki Yagi

    2014-05-01

    Full Text Available Objective: To determine the safety and efficacy of long-term use of mizoribine by undertaking a 3-year post-marketing surveillance study. Methods: Subjects were all lupus nephritis patients newly treated with mizoribine between 1 October 2003 and 30 September 2005 at contracted study sites. Results: Mizoribine was administered to 881 lupus nephritis patients in the safety analysis set consisting of 946 patients recruited from 281 contracted study sites after satisfying the eligibility criteria. There were 301 events of adverse drug reactions that were observed in 196 (20.7% of the 946 subjects. There were 34 events of serious adverse drug reactions in 31 patients (3.2%. No deterioration in hematological and biochemical test values was observed, but immunological testing showed significant improvements in C3, CH50, and anti-DNA antibody titers. The negative rate of proteinuria also increased over time. The median steroid dosage was 15 mg/day at the commencement of treatment, but was reduced to 10 mg/day at 12 months and 8 mg/day at 36 months. Conclusion: The findings of the 3-year long-term drug use surveillance study indicated that mizoribine can be used over the long term with relatively few adverse drug reactions, suggesting its suitability for use in maintenance drug therapy.

  18. Puzzling stakeholder views for long-term planning in the bio-economy

    NARCIS (Netherlands)

    Sisto, Roberta; Vliet, van Mathijs; Prosperi, Maurizio

    2016-01-01

    Planning long-term actions in the South of Italy is often characterised by a 'vicious circle of non-participation'. Stakeholders are increasingly not aware of the relevant role they have in supporting policy-making processes, even if they are usually keen to express their opinions. The aim of the

  19. Care planning for long-term conditions – a concept mapping.

    Science.gov (United States)

    Lhussier, Monique; Eaton, Simon; Forster, Natalie; Thomas, Mathew; Roberts, Sue; Carr, Susan M

    2015-10-01

    This article focuses on approaches within clinical practice that seek to actively involve patients with long-term conditions (LTCs) and how professionals may understand and implement them. Personalized care planning is one such approach, but its current lack of conceptual clarity might have impeded its widespread implementation to date. A variety of overlapping concepts coexist in the literature, which have the potential to impair both clinical and research agendas. The aim of this article is therefore to explore the meaning of the concept of care planning in relation to other overlapping concepts and how this translates into clinical practice implementation. Searches were conducted in the Cochrane database for systematic reviews, CINHAL and MEDLINE. A staged approach to conducting the concept mapping was undertaken, by (i) an examination of the literature on care planning in LTCs; (ii) identification of related terms; (iii) locating reviews of those terms. Retrieved articles were subjected to a content analysis, which formed the basis of our concept maps. (iv) We then appraised these against knowledge and experience of the implementation of care planning in clinical practice. Thirteen articles were retrieved, in which the core importance of patient-centredness, shared decision making and self-management was highlighted. Literature searches on these terms retrieved a further 24 articles. Our concept mapping exercise shows that whilst there are common themes across the concepts, the differences between them reflect the context and intended outcomes within clinical practice. We argue that this clarification exercise will allow for further development of both research and clinical implementation agendas. © 2013 Blackwell Publishing Ltd.

  20. Care plans and care planning in the management of long-term conditions in the UK: a controlled prospective cohort study.

    Science.gov (United States)

    Reeves, David; Hann, Mark; Rick, Jo; Rowe, Kelly; Small, Nicola; Burt, Jenni; Roland, Martin; Protheroe, Joanne; Blakeman, Tom; Richardson, Gerry; Kennedy, Anne; Bower, Peter

    2014-09-01

    In the UK, the use of care planning and written care plans has been proposed to improve the management of long-term conditions, yet there is limited evidence concerning their uptake and benefits. To explore the implementation of care plans and care planning in the UK and associations with the process and outcome of care. A controlled prospective cohort study among two groups of patients with long-term conditions who were similar in demographic and clinical characteristics, but who were registered with general practices varying in their implementation of care plans and care planning. Implementation of care plans and care planning in general practice was assessed using the 2009-2010 GP Patient Survey, and relationships with patient outcomes (self-management and vitality) were examined using multilevel, mixed effects linear regression modelling. The study recruited 38 practices and 2439 patients. Practices in the two groups (high and low users of written documents) were similar in structural and population characteristics. Patients in the two groups of practices were similar in demographics and baseline health. Patients did demonstrate significant differences in reported experiences of care planning, although the differences were modest. Very few patients in the cohort reported a written plan that could be confirmed. Analysis of outcomes suggested that most patients show limited change over time in vitality and self-management. Variation in the use of care plans at the practice level was very limited and not related to patient outcomes over time. The use of written care plans in patients with long-term conditions is uncommon and unlikely to explain a substantive amount of variation in the process and outcome of care. More proactive efforts at implementation may be required to provide a rigorous test of the potential of care plans and care planning. © British Journal of General Practice 2014.

  1. On improving the NPP construction long-term planning

    International Nuclear Information System (INIS)

    Solov'ev, M.M.

    1980-01-01

    General approaches to solving the problems of long-term planning of the construction-mounting work volume and introduction of power capacities at different paces of power unit commission and norms of construction time are considered. Problems associated with location and development of subsidiary industries providing NPP construction are discussed. It is shown that decrease of WWER-1000 reactor type NPP construction time from 24 to 12 months results in reduction of required high-skilled engineers, managerial staff, unique construction mechanisms and engines as well as in improvement of conditions for conducting measures on work arrangement during preparation of construction industry and mounting of the first assemblies

  2. Long-term costs of introducing HPV-DNA post-treatment surveillance to national cervical cancer screening in Ireland.

    Science.gov (United States)

    Agapova, Maria; Duignan, Andrea; Smith, Alan; O'Neill, Ciaran; Basu, Anirban

    2015-01-01

    Co-testing (cytology plus human papillomavirus DNA testing) as part of cervical cancer surveillance in Ireland increases one-time testing costs. Of interest to policy makers was the long-term impact of these costs accompanied by decreases in intensity of recalls for women with no detected abnormalities. A cost analysis of cytology-only and co-testing strategy was implemented using decision analytic modeling, aggregating testing utilization and costs for each of the two strategies over 12 years. Aggregated incremental costs of the co-testing strategy were positive for the first 3 years but became negative thereafter, generating a cost savings of roughly €20 million in favor of the cytology-only strategy over a 12-year period. Results were robust over a range of sensitivity analyses with respect to discount and attrition rates. This analysis provided valuable information to policy makers contributing to the introduction of co-testing for post-treatment surveillance (PTS) in Ireland.

  3. Long-Term Surveillance and Maintenance Records: Maintaining Access to the Knowledge - 13122

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, John; Gueretta, Jeanie [U.S. Department of Energy Office of Legacy Management, 99 Research Park Road Morgantown, WV 26505 (United States); McKinney, Ruth; Anglim, Cliff [Source One Management, Inc. (United States)

    2013-07-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is an integral part of DOE's strategy to ensure that legacy liabilities of former nuclear weapons production sites are properly managed following the completion of environmental cleanup activities. In the area of environmental legacy management, records management is crucial to the protection of health, environmental, and legal interests of the Department and the public. LM is responsible for maintaining long-term surveillance and maintenance (LTS and M) records in performance of its mission. Maintaining access to the knowledge contained in these record collections is one of LM's primary responsibilities. To fulfill this responsibility, LM established a consolidated records management facility, the LM Business Center (LMBC), to house physical media records and electronic records. A new electronic record keeping system (ERKS) was needed to replace an obsolete system while helping to ensure LM is able to meet ongoing responsibilities to maintain access to knowledge and control the life cycle management of records. (authors)

  4. Building on a national health information technology strategic plan for long-term and post-acute care: comments by the Long Term Post Acute Care Health Information Technology Collaborative.

    Science.gov (United States)

    Alexander, Gregory L; Alwan, Majd; Batshon, Lynne; Bloom, Shawn M; Brennan, Richard D; Derr, John F; Dougherty, Michelle; Gruhn, Peter; Kirby, Annessa; Manard, Barbara; Raiford, Robin; Serio, Ingrid Johnson

    2011-07-01

    The LTPAC (Long Term Post Acute Care) Health Information Technology (HIT) Collaborative consists of an alliance of long-term services and post-acute care stakeholders. Members of the collaborative are actively promoting HIT innovations in long-term care settings because IT adoption for health care institutions in the United States has become a high priority. One method used to actively promote HIT is providing expert comments on important documents addressing HIT adoption. Recently, the Office of the National Coordinator for HIT released a draft of the Federal Health Information Technology Strategic Plan 2011-2015 for public comment. The following brief is intended to inform about recommendations and comments made by the Collaborative on the strategic plan. Copyright 2011, SLACK Incorporated.

  5. Site transition framework for long-term surveillance and maintenance

    International Nuclear Information System (INIS)

    2014-01-01

    This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a site's transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein

  6. Site transition framework for long-term surveillance and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a site’s transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein.

  7. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  8. Groundwater surveillance plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    Forstrom, J.M.; Smith, E.D.; Winters, S.L.; McMaster, W.M.

    1994-07-01

    US Department of Energy (DOE) Order 5400.1 requires the preparation of environmental monitoring plans and implementation of environmental monitoring programs for all DOE facilities. The order identifies two distinct components of environmental monitoring, namely effluent monitoring and environmental surveillance. In general, effluent monitoring has the objectives of characterizing contaminants and demonstrating compliance with applicable standards and permit requirements, whereas environmental surveillance has the broader objective of monitoring the effects of DOE activities on on- and off-site environmental and natural resources. The purpose of this document is to support the Environmental Monitoring Plan for the Oak Ridge Reservation (ORR) by describing the groundwater component of the environmental surveillance program for the DOE facilities on the ORR. The distinctions between groundwater effluent monitoring and groundwater surveillance have been defined in the Martin Marietta Energy Systems, Inc., Groundwater Surveillance Strategy. As defined in the strategy, a groundwater surveillance program consists of two parts, plant perimeter surveillance and off-site water well surveillance. This document identifies the sampling locations, parameters, and monitoring frequencies for both of these activities on and around the ORR and describes the rationale for the program design. The program was developed to meet the objectives of DOE Order 5400.1 and related requirements in DOE Order 5400.5 and to conform with DOE guidance on environmental surveillance and the Energy Systems Groundwater Surveillance Strategy

  9. Uptake of genetic testing and long-term tumor surveillance in von Hippel-Lindau disease

    Directory of Open Access Journals (Sweden)

    Chávez Mireya

    2010-01-01

    procedures in non mutation-carriers. However, mutation-carriers showed poor adherence to long-term tumor surveillance. Therefore, many of them did not obtain the full benefit of early detection and treatment, which is central to the reduction of morbidity and mortality in VHL disease. Studies designed to improve adherence to vigilance protocols will be necessary to improve treatment and quality of life in patients with hereditary cancer syndromes.

  10. Long-Term Stewardship Baseline Report and Transition Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Kristofferson, Keith

    2001-11-01

    Long-term stewardship consists of those actions necessary to maintain and demonstrate continued protection of human health and the environment after facility cleanup is complete. As the Department of Energy’s (DOE) lead laboratory for environmental management programs, the Idaho National Engineering and Environmental Laboratory (INEEL) administers DOE’s long-term stewardship science and technology efforts. The INEEL provides DOE with technical, and scientific expertise needed to oversee its long-term environmental management obligations complexwide. Long-term stewardship is administered and overseen by the Environmental Management Office of Science and Technology. The INEEL Long-Term Stewardship Program is currently developing the management structures and plans to complete INEEL-specific, long-term stewardship obligations. This guidance document (1) assists in ensuring that the program leads transition planning for the INEEL with respect to facility and site areas and (2) describes the classes and types of criteria and data required to initiate transition for areas and sites where the facility mission has ended and cleanup is complete. Additionally, this document summarizes current information on INEEL facilities, structures, and release sites likely to enter long-term stewardship at the completion of DOE’s cleanup mission. This document is not intended to function as a discrete checklist or local procedure to determine readiness to transition. It is an overarching document meant as guidance in implementing specific transition procedures. Several documents formed the foundation upon which this guidance was developed. Principal among these documents was the Long-Term Stewardship Draft Technical Baseline; A Report to Congress on Long-Term Stewardship, Volumes I and II; Infrastructure Long-Range Plan; Comprehensive Facility Land Use Plan; INEEL End-State Plan; and INEEL Institutional Plan.

  11. IMPACT OF EUROPEAN INTEGRATION PROCESSES ON THE NECESSITY OF LONG-TERM BUDGET PLANNING INTRODUCTION IN UKRAINE

    Directory of Open Access Journals (Sweden)

    Ganna Muzychenko

    2017-12-01

    Full Text Available The Association Agreement between Ukraine and the European Union was ratified in September 2014. Ukraine has undertaken to implement and enforce EU standards, including in the financial sphere, which are regulated by international law. The purpose of the study is to determine the impact of European integration processes on the necessity of the long-term budget forecasting process introduction into the budget process of Ukraine and the revelation of special budgetary rules regulated this process in the EU. The methodology. The list of requirements (budget procedures and rules for their introduction by law into the budget process of Ukraine was determined based on the generalization and systematization of normative legal acts that regulate the medium-term financial planning as the EU standard. The results showed that the long-term budget forecast developing procedure in the budget process will allow the government to timely identify the unfavourable trend in the state’s fiscal policy and introduce preventive measures, determine the full scale of economy’s and business’ reaction to the reforms’ introduction and new laws adoption, estimate fiscal space for fiscal policy implementation for coming years, take into consideration the budget forecast’s indicators during the annual adoption of budget decisions. The study defines the difference between the budget forecast and the planned budget: the forecast is for five years and more, the plan is for one year only; forecast indicators are not mandatory for implementation, they are only guidelines, and planned indicators are mandatory for implementation; the budget forecast is approved by the order of the Cabinet of Ministers of Ukraine and annually specified, the planned budget (for the current budget year is approved by the Verkhovna Rada of Ukraine by adopting the relevant law, amendments are an exception and also approved by law. The practical implementation. Governments of countries that

  12. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal years 2012

    International Nuclear Information System (INIS)

    Asamori, Koichi; Niwa, Masakazu; Hanamuro, Takahiro; Yamada, Kunimi; Kusano, Tomohiro; Makuuchi, Ayumu; Takatori, Ryoichi; Saito-Kokubu, Yoko; Ishimaru, Tsuneari; Umeda, Koji

    2012-07-01

    The concept of geological disposal of HLW in Japan is based on a multi-barrier system which combines a stable geological environment with a robust barrier system. Potential geological host formations and their surroundings are chosen, in particular, for their long-term stability, taking into account the fact that Japan is located in a tectonically active zone. This report is a plan of research and development (R and D) on geosphere stability for long-term isolation of HLW in JAEA, in fiscal year 2012. The objectives and contents in fiscal year 2012 are described in detail based on the outline of 5 years plan (fiscal years 2010-2014). In addition, the planned framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  13. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal years 2010

    International Nuclear Information System (INIS)

    Yasue, Ken-ichi; Asamori, Koichi; Yamada, Kunimi; Saito-Kokubu, Yoko; Yamasaki, Seiko; Kurosawa, Hideki; Tanikawa, Shin-ichi; Negi, Tateyuki; Kusano, Tomohiro; Hanamuro, Takahiro; Ishimaru, Tsuneari; Umeda, Koji

    2010-09-01

    The concept of geological disposal of HLW in Japan is based on a multibarrier system which combines a stable geological environment with an engineered barrier system. Potential geological host formations and their surroundings are chosen, in particular, for their long-term stability, taking into account the fact that Japan is located in a tectonically active zone. This report is a plan of research and development (R and D) for geosphere stability for long-term isolation of HLW in JAEA, in fiscal year 2010. The objectives and contents in fiscal year 2010 are described in detail based on the outline of 5 years plan (fiscal years 2010-2014). In addition, the plan framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  14. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  15. Joint operations planning for space surveillance missions on the MSX satellite

    Science.gov (United States)

    Stokes, Grant; Good, Andrew

    1994-01-01

    The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a

  16. Variable Renewable Energy in Long-Term Planning Models: A Multi-Model Perspective

    Energy Technology Data Exchange (ETDEWEB)

    Cole, Wesley [National Renewable Energy Lab. (NREL), Golden, CO (United States); Frew, Bethany [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sun, Yinong [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bistline, John [Electric Power Research Inst. (EPRI), Knoxville, TN (United States); Blanford, Geoffrey [Electric Power Research Inst. (EPRI), Knoxville, TN (United States); Young, David [Electric Power Research Inst. (EPRI), Knoxville, TN (United States); Marcy, Cara [U.S. Energy Information Administration, Washington, DC (United States); Namovicz, Chris [U.S. Energy Information Administration, Washington, DC (United States); Edelman, Risa [US Environmental Protection Agency (EPA), Washington, DC (United States); Meroney, Bill [US Environmental Protection Agency (EPA), Washington, DC (United States); Sims, Ryan [US Environmental Protection Agency (EPA), Washington, DC (United States); Stenhouse, Jeb [US Environmental Protection Agency (EPA), Washington, DC (United States); Donohoo-Vallett, Paul [Dept. of Energy (DOE), Washington DC (United States)

    2017-11-01

    Long-term capacity expansion models of the U.S. electricity sector have long been used to inform electric sector stakeholders and decision-makers. With the recent surge in variable renewable energy (VRE) generators — primarily wind and solar photovoltaics — the need to appropriately represent VRE generators in these long-term models has increased. VRE generators are especially difficult to represent for a variety of reasons, including their variability, uncertainty, and spatial diversity. This report summarizes the analyses and model experiments that were conducted as part of two workshops on modeling VRE for national-scale capacity expansion models. It discusses the various methods for treating VRE among four modeling teams from the Electric Power Research Institute (EPRI), the U.S. Energy Information Administration (EIA), the U.S. Environmental Protection Agency (EPA), and the National Renewable Energy Laboratory (NREL). The report reviews the findings from the two workshops and emphasizes the areas where there is still need for additional research and development on analysis tools to incorporate VRE into long-term planning and decision-making. This research is intended to inform the energy modeling community on the modeling of variable renewable resources, and is not intended to advocate for or against any particular energy technologies, resources, or policies.

  17. Multi criteria analysis for the long term planning of the mexican electrical system expansion - 337

    International Nuclear Information System (INIS)

    Martin-del-Campo, C.; Guadarrama, R.; Francois, J.L.

    2010-01-01

    A multi-criteria analysis was applied to the long term electricity expansion planning for Mexico for the 2008-2030 period. This methodology is based on a fuzzy logic inference system, which allows for the definition of a decision function that takes into account all the evaluation parameters. This function permits one to rank the alternative expansion plans in order to determine the most attractive option. In this study four evaluation parameters were considered: (a) the total generating cost obtained from an optimization expansion using the WASP-IV model, (b) the economic risk associated with fuel prices increases, (c) the diversity of technologies in the mix, and (d) the external costs. The analysis was applied to a base case and to three additional expansion cases, which are very similar to the base case, but each of them excludes the addition of a certain type of candidate technology in the optimization planning. The base case is Plan A which has six candidate technologies available for the optimization planning. Plan B excludes coal; Plan C excludes oil, and Plan D excludes nuclear energy. After the decision analysis was made it was found that Plan B is best followed by Plan A, then Plan C and finally Plan D. The worst plan expansion was obtained when the nuclear candidate was excluded in the program of additions during the time period. The primary conclusion is that nuclear energy must participate in the mix of electricity generation. This result can be used to define the energy policy for electricity production in Mexico in the medium-long term scenario. (authors)

  18. Effect of stage development of mining operations on maximization the net present value in long-term planning of open pits

    OpenAIRE

    Kržanović, Daniel; Rajković, Radmilo; Mikić, Miomir; Ljubojev, Milenko

    2014-01-01

    Long-term planning in the mining industry has one main goal: maximizing the value that is realized by excavation and processing of mineral resources. When designing the open pits, determining the stages of development the mining operations, (eng. Pushback) is one of the important factors in the process of long-term production planning. Using the different scientific methods and mathematical algorithms underlying the operation of modern software for strategic planning of production, it is poss...

  19. Coordination of short-term and long-term mitigation measures of hydro-meteorological risks: the importance of establishing a link between emergency management and spatial planning

    Science.gov (United States)

    Prenger-Berninghoff, Kathrin; Cortes, V. Juliette; Aye, Zar Chi; Sprague, Teresa

    2013-04-01

    The management of natural hazards involves, as generally known, the four stages of the risk management cycle: Prevention, preparedness, response and recovery. Accordingly, the mitigation of disasters can be performed in terms of short-term and long-term purposes. Whereas emergency management or civil protection helps to strengthen a community's capacity to be better prepared for natural hazards and to better respond in case a disaster strikes, thus addressing the short-term perspective, spatial planning serves long-term planning goals and can therefore implement long-term prevention measures. A purposefully applied risk mitigation strategy requires coordination of short-term and long-term mitigation measures and thus an effective coordination of emergency management and spatial planning. Several actors are involved in risk management and should consequently be linked throughout the whole risk management cycle. However, these actors, partly because of a historically fragmented administrative system, are hardly connected to each other, with spatial planning only having a negligible role compared to other actors1, a problem to which Young (2002) referred to as the "problem of interplay". In contrast, information transfer and decision-taking happen at the same time and are not coordinated among different actors. This applies to the prevention and preparedness phase as well as to the recovery phase, which basically constitutes the prevention phase for the next disaster2. Since investments in both risk prevention and emergency preparedness and response are considered necessary, a better coordination of the two approaches is required. In this regard, Decision Support Systems (DSS) can be useful in order to provide support in the decision-making aspect of risk management. The research work currently undertaken examines the problem of interplay in the four case study areas of the Marie Curie ITN, CHANGES3. The link between different risk management actors will be explored

  20. Long-term video surveillance and automated analyses reveal arousal patterns in groups of hibernating bats

    Science.gov (United States)

    Hayman, David T.S.; Cryan, Paul; Fricker, Paul D.; Dannemiller, Nicholas G.

    2017-01-01

    Understanding natural behaviours is essential to determining how animals deal with new threats (e.g. emerging diseases). However, natural behaviours of animals with cryptic lifestyles, like hibernating bats, are often poorly characterized. White-nose syndrome (WNS) is an unprecedented disease threatening multiple species of hibernating bats, and pathogen-induced changes to host behaviour may contribute to mortality. To better understand the behaviours of hibernating bats and how they might relate to WNS, we developed new ways of studying hibernation across entire seasons.We used thermal-imaging video surveillance cameras to observe little brown bats (Myotis lucifugus) and Indiana bats (M. sodalis) in two caves over multiple winters. We developed new, sharable software to test for autocorrelation and periodicity of arousal signals in recorded video.We processed 740 days (17,760 hr) of video at a rate of >1,000 hr of video imagery in less than 1 hr using a desktop computer with sufficient resolution to detect increases in arousals during midwinter in both species and clear signals of daily arousal periodicity in infected M. sodalis.Our unexpected finding of periodic synchronous group arousals in hibernating bats demonstrate the potential for video methods and suggest some bats may have innate behavioural strategies for coping with WNS. Surveillance video and accessible analysis software make it now practical to investigate long-term behaviours of hibernating bats and other hard-to-study animals.

  1. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal year 2016

    International Nuclear Information System (INIS)

    Ishimaru, Tsuneari; Yasue, Kenichi; Kokubu, Yoko; Niwa, Masakazu; Asamori, Koichi; Watanabe, Takahiro; Yokoyama, Tatsunori; Fujita, Natsuko; Shimizu, Mayuko; Hama, Yuki

    2016-08-01

    This report is a plan of research and development (R and D) on geosphere stability for long-term isolation of high-level radioactive waste (HLW) in Japan Atomic Energy Agency, in fiscal year 2016. The objectives and contents in fiscal year 2016 are described in detail based on the outline of 7 years plan (fiscal years 2015-2021). Background of this research is clarified with the necessity and the significance for site investigation and safety assessment, and the past progress in this report. In addition, the plan framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  2. The long-term nuclear explosives predicament

    International Nuclear Information System (INIS)

    Swahn, J.

    1992-01-01

    A scenario is described, where the production of new military fissile materials is halted and where civil nuclear power is phased out in a 'no-new orders' case. It is found that approximately 1100 tonnes of weapons-grade uranium, 233 tonnes of weapons-grade plutonium and 3795 tonnes of reactor-grade plutonium have to be finally disposed of as nuclear waste. This material could be used for the construction of over 1 million nuclear explosives. Reactor-grade plutonium is found to be easier to extract from spent nuclear fuel with time and some physical characteristics important for the construction of nuclear explosives are improved. Alternative methods for disposal of the fissile material that will avoid the long-term nuclear explosives predicament are examined. Among these methods are dilution, denaturing or transmutation of the fissile material and options for practicably irrecoverable disposal in deep boreholes, on the sea-bed, and in space. It is found that the deep boreholes method for disposal should be the primary alternative to be examined further. This method can be combined with an effort to 'forget' where the material was put. Included in the thesis is also an evaluation of the possibilities of controlling the limited civil nuclear activities in a post-nuclear world. Some surveillance technologies for a post-nuclear world are described, including satellite surveillance. In a review part of the thesis, methods for the production of fissile material for nuclear explosives are described, the technological basis for the construction of nuclear weapons is examined, including use of reactor-grade plutonium for such purposes; also plans for the disposal of spent fuel from civil nuclear power reactors and for the handling of the fissile material from dismantled warheads is described. The Swedish plan for the handling and disposal of spent nuclear fuel is described in detail. (490 refs., 66 figs., 27 tabs.)

  3. Emergency Response and Long Term Planning: Two sides of the Coin for Managing Water Resources

    Science.gov (United States)

    Metchis, K.; Beller-Simms, N.

    2014-12-01

    As projected by the US National Climate Assessment and the IPCC, extreme climate and weather events are occurring more frequently and with more intensity across the nation. Communities - and the water resource managers that serve them - are facing difficult choices to increase emergency preparedness, recover from costly impacts, and increase long term resilience. The presentation is based on a recent set of case studies about what happened in six communities that experienced one or more extreme events, focusing on water resource management. Two of the case studies will be presented, revealing that building climate resilience is not just about long term planning - it is also about taking the steps to be prepared for - and to be able to recover from - emergency events. The results of this study have implications for educating local officials on ways to think about resilience to balance both long-term and short-term preparedness.

  4. Long-term rate orientations: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    Hydro-Quebec's preferred rate orientations for Quebec markets are presented. The background for a rate structure revision is outlined, followed by proposed changes to residential and general rates, and by a plan to implement the new rate structure. Some of the principles used in setting rates are described. The new rate structure proposals are intended to provide a better reflection of the utility's costs of supply and a clearer signal in favor of the rational use of electricity, thereby limiting long-term increases in both supply costs and electricity rates. It is proposed to use marginal costs to design rate structures, while the overall rate level will continue to reflect changes in average costs of supply. Also included in the proposed changes are time-of-use rates, which will help reduce costs by shifting loads from peak to off-peak periods and by encouraging the adoption of energy-conservation measures. Moreover, the integration of time-of-use options into the rate system will not only provide Hydro-Quebec with more powerful load-management tools but also give customers the opportunity to change their consumption patterns and thereby reduce their electricity bills. 11 figs., 11 tabs

  5. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal years 2011

    International Nuclear Information System (INIS)

    Yasue, Ken-ichi; Asamori, Koichi; Kusano, Tomohiro; Saito-Kokubu, Yoko; Tanikawa, Shin-ichi; Niwa, Masakazu; Hanamuro, Takahiro; Yamasaki, Seiko; Yamada, Kunimi; Ishimaru, Tsuneari; Umeda, Koji

    2011-07-01

    The concept of geological disposal of HLW in Japan is based on a multi-barrier system which combines a stable geological environment with a robust barrier system. Potential geological host formations and their surroundings are chosen, in particular, for their long-term stability, taking into account the fact that Japan is located in a tectonically active zone. This report is a plan of research and development (R and D) on geosphere stability for long-term isolation of HLW in JAEA, in fiscal year 2011. The objectives and contents in fiscal year 2011 are described in detail based on the outline of 5 years plan (fiscal years 2010-2014). In addition, the planed framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  6. Diffuse large B-cell lymphoma associated with the use of biologic and other investigational agents: the importance of long-term post-marketing safety surveillance.

    Science.gov (United States)

    Goddard, Allison; Borovicka, Judy H; West, Dennis P; Evens, Andrew M; Laumann, Anne

    2011-01-01

    This case report describes a patient who developed diffuse large B-cell lymphoma (DLBCL) after receiving courses of two investigational biologic agents and cyclosporine followed by more than four years of subcutaneous efalizumab for the treatment of extensive chronic plaque psoriasis. Three years later, the patient remains free of lymphoma and his psoriasis is well controlled with thrice-weekly narrow-band ultraviolet phototherapy. This case emphasizes the importance of continued long-term post-marketing safety surveillance and the early reporting of all possible serious side effects, including cancers, related to the use of any newly available product. In particular, surveillance should focus on the immunomodulating biologic agents in order to identify possible dangerous sequelae.

  7. Laser surveillance system (LASSY)

    International Nuclear Information System (INIS)

    Boeck, H.

    1991-09-01

    Laser Surveillance System (LASSY) is a beam of laser light which scans a plane above the water or under-water in a spent-fuel pond. The system can detect different objects and estimates its coordinates and distance as well. LASSY can operate in stand-alone configuration or in combination with a video surveillance to trigger signal to a videorecorder. The recorded information on LASSY computer's disk comprises date, time, start and stop angle of detected alarm, the size of the disturbance indicated in number of deviated points and some other information. The information given by the laser system cannot be fully substituted by TV camera pictures since the scanning beam creates a horizontal surveillance plan. The engineered prototype laser system long-term field test has been carried out in Soluggia (Italy) and has shown its feasibility and reliability under the conditions of real spent fuel storage pond. The verification of the alarm table on the LASSY computer with the recorded video pictures of TV surveillance system confirmed that all alarm situations have been detected. 5 refs

  8. Long-term exports and use of interconnections: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The orientations, objectives, and strategies proposed for long-term exports of electricity from Quebec are presented, as well as the use of interconnections between Hydro-Quebec and northeastern US utilities. A recent historical overview shows that after a period of exporting large amounts of surplus energy in the late 1980s, most export sales are of firm power and energy. Export commitments signed for 1993-2000 amount to total exports of 11-14 TWh per year with revenues generated to be at least $4 billion. Hydro-Quebec originally had an export strategy with a target of 3,500 MW of firm power and energy exports by the year 2000. An economic recession, lower demand for power in the USA, new planning policies at US utilities emphasizing maximum flexibility, and competition from other electricity providers have revised this estimate downward. Over the short and medium term, neighboring US utilities will experience surpluses in both capacity and energy, and additional requirements indicated by their demand forecasts only appear after the year 2000. The situation is similar for neighboring Canadian utilities. In the long term, Hydro-Quebec's objective is to meet 15-20% of new requirements on neighboring US systems. New agreements could represent 1,500 MW by the year 2004, or ca 8.5 TWh/y. Hydro-Quebec also wants to be recognized as an active partner in the market for short-term transactions and to maximize use of its generation and interconnection facilities. The utility will examine transactions such as guaranteeing reserve capacity, energy banking, wheeling service, and pooling of generating capacities in order to offer the products best suited to customer needs. 3 figs., 3 tabs

  9. Test Plan for Long-Term Operation of a Ten-Cell High Temperature Electrolysis Stack

    International Nuclear Information System (INIS)

    James E. O'Brien; Carl M. Stoots; J. Stephen Herring

    2008-01-01

    This document defines a test plan for a long-term (2500 Hour) test of a ten-cell high-temperature electrolysis stack to be performed at INL during FY09 under the Nuclear Hydrogen Initiative. This test was originally planned for FY08, but was removed from our work scope as a result of the severe budget cuts in the FY08 NHI Program. The purpose of this test is to evaluate stack performance degradation over a relatively long time period and to attempt to identify some of the degradation mechanisms via post-test examination. This test will be performed using a planar ten-cell Ceramatec stack, with each cell having dimensions of 10 cm x 10 cm. The specific makeup of the stack will be based on the results of a series of shorter duration ten-cell stack tests being performed during FY08, funded by NGNP. This series of tests was aimed at evaluating stack performance with different interconnect materials and coatings and with or without brazed edge rails. The best performing stack from the FY08 series, in which five different interconnect/coating/edge rail combinations were tested, will be selected for the FY09 long-term test described herein

  10. Long-term prisoner in prison isolation

    Directory of Open Access Journals (Sweden)

    Karolina Grudzińska

    2013-06-01

    Full Text Available Long-term prisoner belongs to a particular category of people who are imprisoned in prisons. On the one hand in this group are often heavily demoralized people who committed the most serious crimes, on the other hand it is a group of prisoners, who should be well thought out and programmed the impact of rehabilitation. The situation of man trapped for years poses in a complicated situation not only the prisoners, but also the entire prison staff. They have to take care of the fact that the prison isolation did not cause the state in which convicts form itself in learned helplessness and lack of skills for self-planning and decision-making. In addition, planning the rehabilitation impact of long-term prisoners should not be forgotten that these prisoners in the short or the long term will return to the libertarian environment therefore, should prevent any negative effects of long-term imprisonment. This article presents the main issues related to the execution of imprisonment against long-term prisoners. It is an attempt to systematize the knowledge of this category of people living in prison isolation.

  11. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    International Nuclear Information System (INIS)

    Banaee, J.

    2002-01-01

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances

  12. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    Energy Technology Data Exchange (ETDEWEB)

    Banaee, J.

    2002-05-16

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances.

  13. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    Energy Technology Data Exchange (ETDEWEB)

    Banaee, Jila

    2002-08-01

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances.

  14. Near-Term Actions to Address Long-Term Climate Risk

    Science.gov (United States)

    Lempert, R. J.

    2014-12-01

    Addressing climate change requires effective long-term policy making, which occurs when reflecting on potential events decades or more in the future causes policy makers to choose near-term actions different than those they would otherwise pursue. Contrary to some expectations, policy makers do sometimes make such long-term decisions, but not as commonly and successfully as climate change may require. In recent years however, the new capabilities of analytic decision support tools, combined with improved understanding of cognitive and organizational behaviors, has significantly improved the methods available for organizations to manage longer-term climate risks. In particular, these tools allow decision makers to understand what near-term actions consistently contribute to achieving both short- and long-term societal goals, even in the face of deep uncertainty regarding the long-term future. This talk will describe applications of these approaches for infrastructure, water, and flood risk management planning, as well as studies of how near-term choices about policy architectures can affect long-term greenhouse gas emission reduction pathways.

  15. The long-term demographic role of community-based family planning in rural Bangladesh.

    Science.gov (United States)

    Phillips, J F; Hossain, M B; Arends-Kuenning, M

    1996-01-01

    Experimental studies demonstrating the effectiveness of nonclinical distribution of contraceptives are typically conducted in settings where contraceptive use is low and unmet need is extensive. Determining the long-term role of active outreach programs after initial demand is met represents an increasingly important policy issue in Asia, where contraceptive prevalence is high and fixed service points are conveniently available. This article examines the long-term rationale for household family planning in Bangladesh-where growing use of contraceptives, rapid fertility decline, and normative change in reproductive preferences are in progress, bringing into question the rationale for large-scale deployment of paid outreach workers. Longitudinal data are analyzed that record outreach encounters and contraceptive use dynamics in a large rural population. Findings demonstrate that outreach has a continuing impact on program effectiveness, even after a decade of household visitation. The policy implications of this finding are reviewed.

  16. Plan for the long term environmental assessment of geopressured resource development in the Louisiana Gulf Coast Region

    Energy Technology Data Exchange (ETDEWEB)

    Newchurch, E.J.; Bryan, C.F.; Harrison, D.P.; Muller, R.A.; Wilcox, R.E.; Bachman, A.L.; Newman, J.P.; Cunningham, K.J.; Hilding, R.K.; Rehage, J.A.

    1978-07-15

    Results of research to develop a plan for the long-term environmental assessment of geopressured/geothermal resource development in the Louisiana Gulf Coast region are reported. An overall view of the environmental issues facing decision-makers in the area of geopressured resource development is presented, along with a plan for monitoring potential environmental impacts. Separate assessments and plans are presented for geological effects, air and water quality, ecosystem quality, and socioeconomic and cultural considerations. (JGB)

  17. Short-term power plant operation scheduling in thermal systems with long-term boundary conditions

    International Nuclear Information System (INIS)

    Wolter, H.

    1990-01-01

    For the first time, the modeling of long-term quantitative conditions within the short-term planning of the application of power stations is made via their shadow prices. It corresponds to a decomposition of the quantitative conditions by means of the method of the Langrange relaxation. The shadow prices determined by the planning for energy application regarding long- term quantitative conditions pass into the short-term planning for power station application and subsidize or rather punish the application of limited amounts as for as they are not claimed for sufficiently or excessively. The clear advantage of this modeling is that the short-term planning of power station application can deviate from the envisioned energy application regarding the total optimum, because the shadow prices contain all information about the cost effect of the energy shifts in the residual total period, which become necessary due to the deviations in the short-term period to be planned in the current short-term period. (orig./DG) [de

  18. Variable Renewable Energy in Long-Term Planning Models: A Multi-Model Perspective

    Energy Technology Data Exchange (ETDEWEB)

    Cole, Wesley J. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Frew, Bethany A. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Mai, Trieu T. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Sun, Yinong [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Bistline, John [Electric Power Research Inst., Palo Alto, CA (United States); Blanford, Geoffrey [Electric Power Research Inst., Palo Alto, CA (United States); Young, David [Electric Power Research Inst., Palo Alto, CA (United States); Marcy, Cara [Energy Information Administration, Washington, DC (United States); Namovicz, Chris [Energy Information Administration, Washington, DC (United States); Edelman, Risa [Environmental Protection Agency, Washington, DC (United States); Meroney, Bill [Environmental Protection Agency; Sims, Ryan [Environmental Protection Agency; Stenhouse, Jeb [Environmental Protection Agency; Donohoo-Vallett, Paul [U.S. Department of Energy

    2017-11-03

    Long-term capacity expansion models of the U.S. electricity sector have long been used to inform electric sector stakeholders and decision makers. With the recent surge in variable renewable energy (VRE) generators - primarily wind and solar photovoltaics - the need to appropriately represent VRE generators in these long-term models has increased. VRE generators are especially difficult to represent for a variety of reasons, including their variability, uncertainty, and spatial diversity. To assess current best practices, share methods and data, and identify future research needs for VRE representation in capacity expansion models, four capacity expansion modeling teams from the Electric Power Research Institute, the U.S. Energy Information Administration, the U.S. Environmental Protection Agency, and the National Renewable Energy Laboratory conducted two workshops of VRE modeling for national-scale capacity expansion models. The workshops covered a wide range of VRE topics, including transmission and VRE resource data, VRE capacity value, dispatch and operational modeling, distributed generation, and temporal and spatial resolution. The objectives of the workshops were both to better understand these topics and to improve the representation of VRE across the suite of models. Given these goals, each team incorporated model updates and performed additional analyses between the first and second workshops. This report summarizes the analyses and model 'experiments' that were conducted as part of these workshops as well as the various methods for treating VRE among the four modeling teams. The report also reviews the findings and learnings from the two workshops. We emphasize the areas where there is still need for additional research and development on analysis tools to incorporate VRE into long-term planning and decision-making.

  19. Accessibility of long-term family planning methods: a comparison study between Output Based Approach (OBA) clients verses non-OBA clients in the voucher supported facilities in Kenya.

    Science.gov (United States)

    Oyugi, Boniface; Kioko, Urbanus; Kaboro, Stephen Mbugua; Gikonyo, Shadrack; Okumu, Clarice; Ogola-Munene, Sarah; Kalsi, Shaminder; Thiani, Simon; Korir, Julius; Odundo, Paul; Baltazaar, Billy; Ranji, Moses; Muraguri, Nicholas; Nzioka, Charles

    2017-03-27

    The study seeks to evaluate the difference in access of long-term family planning (LTFP) methods among the output based approach (OBA) and non-OBA clients within the OBA facility. The study utilises a quasi experimental design. A two tailed unpaired t-test with unequal variance is used to test for the significance variation in the mean access. The difference in difference (DiD) estimates of program effect on long term family planning methods is done to estimate the causal effect by exploiting the group level difference on two or more dimensions. The study also uses a linear regression model to evaluate the predictors of choice of long-term family planning methods. Data was analysed using SPSS version 17. All the methods (Bilateral tubal ligation-BTL, Vasectomy, intrauterine contraceptive device -IUCD, Implants, and Total or combined long-term family planning methods -LTFP) showed a statistical significant difference in the mean utilization between OBA versus non-OBA clients. The difference in difference estimates reveal that the difference in access between OBA and non OBA clients can significantly be attributed to the implementation of the OBA program for intrauterine contraceptive device (p = 0.002), Implants (p = 0.004), and total or combined long-term family planning methods (p = 0.001). The county of residence is a significant determinant of access to all long-term family planning methods except vasectomy and the year of registration is a significant determinant of access especially for implants and total or combined long-term family planning methods. The management level and facility type does not play a role in determining the type of long-term family planning method preferred; however, non-governmental organisations (NGOs) as management level influences the choice of all methods (Bilateral tubal ligation, intrauterine contraceptive device, Implants, and combined methods) except vasectomy. The adjusted R 2 value, representing the percentage of

  20. THE FINANCING PLAN – TOOL FOR ANALYZING LONG TERM DEVELOPMENT PROGRAMS WITHIN ECONOMIC ENTITIES

    Directory of Open Access Journals (Sweden)

    MARIANA ZAMFIR

    2017-12-01

    Full Text Available The financing plan is a predictive financial situation that allows the study and analysis of the effects of medium and long term projects on the treasury situation. The preparation of the financing plan is preceded by a procedure for selecting a cost-effective investment project from several possible projects. Understanding the concept of a financing plan is the first issue to be addressed. Then it is analyzed its structure outlining the main categories of resources and uses that need to be highlighted for the preparation of the financing plan; the steps necessary for its development are described, the research ending with the presentation of a case study on the preparation of a financing plan for a company. The research results can be used by any investor to analyze the impact of the investments he wishes to make on the company’s treasury and to decide on the sources of their funding.

  1. Surveillance plan for the early detection of H5N1 highly pathogenic avian influenza virus in migratory birds in the United States: surveillance year 2009

    Science.gov (United States)

    Brand, Christopher J.

    2009-01-01

    Executive Summary: This Surveillance Plan (Plan) describes plans for conducting surveillance of wild birds in the United States and its Territories and Freely-Associated States to provide for early detection of the introduction of the H5N1 Highly Pathogenic Avian Influenza (HPAI) subtype of the influenza A virus by migratory birds during the 2009 surveillance year, spanning the period of April 1, 2009 - March 31, 2010. The Plan represents a continuation of surveillance efforts begun in 2006 under the Interagency Strategic Plan for the Early Detection of H5N1 Highly Pathogenic Avian Influenza in Wild Migratory Birds (U.S. Department of Agriculture and U.S. Department of the Interior, 2006). The Plan sets forth sampling plans by: region, target species or species groups to be sampled, locations of sampling, sample sizes, and sampling approaches and methods. This Plan will be reviewed annually and modified as appropriate for subsequent surveillance years based on evaluation of information from previous years of surveillance, changing patterns and threats of H5N1 HPAI, and changes in funding availability for avian influenza surveillance. Specific sampling strategies will be developed accordingly within each of six regions, defined here as Alaska, Hawaiian/Pacific Islands, Lower Pacific Flyway (Washington, Oregon, California, Idaho, Nevada, Arizona), Central Flyway, Mississippi Flyway, and Atlantic Flyway.

  2. Factors influencing long term dynamics of health care supply and demand

    NARCIS (Netherlands)

    Smits, M.T.; Roos, E.; Pries-Heje, J.; Chiasson, M.; Wareham, J.; Busquets, X.; Valor, J.

    2012-01-01

    Governments and other policy makers use long-term planning models to support workforce planning decisions for regulating care markets and to ensure accurate balancing between care supply and demand. Our aim is to understand long-term effects of workforce planning decisions on care markets, in order

  3. 21 CFR 822.11 - What should I consider when designing my plan to conduct postmarket surveillance?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false What should I consider when designing my plan to conduct postmarket surveillance? 822.11 Section 822.11 Food and Drugs FOOD AND DRUG ADMINISTRATION... Surveillance Plan § 822.11 What should I consider when designing my plan to conduct postmarket surveillance...

  4. Long-Term Safety Analysis of Baldone Radioactive Waste Repository and Updating of Waste Acceptance Criteria

    International Nuclear Information System (INIS)

    2001-12-01

    The main objective of the project was to provide advice to the Latvian authorities on the safety enhancements and waste acceptance criteria for near surface radioactive waste disposal facilities of the Baldone repository. The project included the following main activities: Analysis of the current status of the management of radioactive waste in Latvia in general and, at the Baldone repository in particular Development of the short and long-term safety analysis of the Baldone repository, including: the planned increasing of capacity for disposal and long term storage, the radiological analysis for the post-closure period Development of the Environment Impact Statement, for the new foreseen installations, considering the non radiological components Proposal of recommendations for future updating of radioactive waste acceptance criteria Proposal of recommendations for safety upgrades to the facility. The work programme has been developed in phases and main tasks as follows. Phase 0: Project inception, Phase 1: Establishment of current status, plans and practices (Legislation, regulation and standards, Radioactive waste management, Waste acceptance criteria), Phase 2: Development of future strategies for long-term safety management and recommendations for safety enhancements. The project team found the general approach use at the installation, the basic design and the operating practices appropriate to international standards. Nevertheless, a number of items subject to potential improvements were also identified. These upgrading recommendations deal with general aspects of the management (mainly storage versus disposal of long-lived sources), site and environmental surveillance, packaging (qualification of containers, waste characterization requirements), the design of an engineered cap and strategies for capping. (author)

  5. Behind the scenes of GS: a long-term urban planning vision

    CERN Multimedia

    Corinne Pralavorio

    2014-01-01

    The GS Department is working on a long-term plan for the urban planning of the CERN sites, ensuring that their development takes place using a coherent approach and keeping in mind the need for harmonious integration in the surrounding area.   Visitors are often bemused by CERN’s buildings, with their 1950s style and a layout that seems to defy all logic. Up until the 90s, buildings were erected as accelerators were built, with no apparent concern for harmony. But now, with a much larger number of users and installations, space is at a premium, getting around the site is difficult and urban planners are needed more than ever. "Over 9,000 people enter the CERN sites every day and we have 7,500 workstations," says Frédéric Magnin, Civil Engineering and Buildings Section Leader in the GS Department. For this reason, specialists in the department have been working on the development of the sites for five years. It is especially important that the...

  6. ERDA's long-term waste management goals and programs

    International Nuclear Information System (INIS)

    Perge, A.F.; Trice, V.G. Jr.; Walton, R.D. Jr.

    1976-01-01

    This paper presents an overview of the ERDA's major program for the long-term waste management of radioactive waste and provides a perspective for symposium participants with regard to the interrelationship of specific components of the program that are discussed in detail in other ERDA-sponsored papers. Needs, goals, and plans are reviewed for ERDA's management of the commercially generated wastes which are expected to be delivered to ERDA in accordance with Federal regulations. At present, ERDA responsibilities include long-term management of commercial-level wastes. Possible future regulations may give ERDA responsibility for the long-term management of commercial low-level solid wastes contaminated with transuranic nuclides. Primary planning goals and programs for the development of terminal storage facilities and waste processing technology to produce acceptable waste forms for long-term management are reviewed for each of the waste types identified above. The status of development programs for the long-term management of airborne radionuclides, which may be required at some time in the future, is also reviewed. (author)

  7. Scintillation mitigation for long-range surveillance video

    CSIR Research Space (South Africa)

    Delport, JP

    2010-09-01

    Full Text Available Atmospheric turbulence is a naturally occurring phenomenon that can severely degrade the quality of long-range surveillance video footage. Major effects include image blurring, image warping and temporal wavering of objects in the scene. Mitigating...

  8. Development of oil supply and demand planning model for mid- and long-term

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Hyun [Korea Energy Economics Institute, Euiwang (Korea)

    1997-10-01

    Despite the liberalization of oil market, a systematic model is required for reasonable supply and demand of oil, which still has an important influence on industry and state economy. It is required a demand model deriving prospects of each sector and product and a supply model examining the optimum rate of operation, production mix of products, stock, export and import, and the size of equipment investment to meet given demand. As the first phase for the development of supply and demand model, the existing oil and energy models in domestic and overseas were reviewed and recommendations for establishing a Korean oil supply and demand model were derived in this study. Based on these, a principle for establishing a model and a rough framework were set up. In advance of mid- and long-term prospects, a short-term prospect model was established and the short-term prospects for the first quarter of 1999 and for the year 1999 were presented on trial. Due to the size and characters of a supply model, a plan for an ideal model was first explained and then a plan for creating a model step by step was presented as a realistic scheme. (author). 16 refs., 9 figs., 19 tabs.

  9. Workshop on IAEA Tools for Nuclear Energy System Assessment for Long-Term Planning and Development

    International Nuclear Information System (INIS)

    2009-01-01

    The purpose of the workshop is to present to Member States tools and methods that are available from the IAEA in support of long-term energy planning and nuclear energy system assessments, both focusing on the sustainable development of nuclear energy. This includes tools devoted to energy system planning, indicators for sustainable energy development, the INPRO methodology for Nuclear Energy System Assessment (NESA) and tools for analysing nuclear fuel cycle material balance. The workshop also intends to obtain feedback from Member States on applying the tools, share experiences and lessons learned, and identify needs for IAEA support

  10. The Role of the Government and the Public in the Planning of Long Term Management for Nuclear Fuel Wastes in Canada

    International Nuclear Information System (INIS)

    Diah Hidayanti; Yudi Pramono

    2007-01-01

    The generation of electricity from nuclear power has the consequence of producing some wastes that are radioactive, especially in the form of spent fuels which are classified as high level nuclear wastes. Nuclear fuel wastes must be managed properly in order to protect public and environment from its big potential hazard. One type of long term management for nuclear fuel wastes is the final disposal in a permanent storage. Because of the importance of safety aspects for final disposal, it needs the involvement of government and the public to determine the reliability and the acceptance of final disposal concept. Those involvements can be implemented in some aspects such as regulation aspect, review and assessment process, and the public feedback. The evaluation on the plan of long term management for nuclear fuel wastes in Canada provides Indonesia an overview of its long term management plans for all radioactive materials, including nuclear fuel wastes generated from the nuclear power plant which is planned to be in service by 2016. (author)

  11. Developing a surveillance system for HIV/AIDS in Pakistan

    International Nuclear Information System (INIS)

    Emmanuel, F.; Bokhari, A.

    2006-01-01

    Apart from other interventions, surveillance remains a major focus of the national response to HIV/AIDS. However, with a shift in the epidemic pattern, the existing surveillance strategies are barely insufficient and long-term structural changes are desirable. This article provides a conceptual framework for developing a scientific system for HIV surveillance in Pakistan. Second generation surveillance system including repeated cross-sectional surveys in high risk population groups are suggested to collect behavioral and serological data at regular intervals on an annual basis to monitor the epidemic trend as well as the associated behaviors. In addition, multiple data resources have been highlighted, which could be coordinated to describe the epidemic pattern in the country. This information should form the basis for national prevention planning and ought to be used for making sensible choices through which prevention efforts are most likely to reduce new infections. (author)

  12. How much radiation dose, to whom? Long-term storage, surveillance, retrieval and long processes cause additional dose to employees; Wie viel Strahlendosis fuer wen? Lange Lagerung, Offenhaltung und ein langer Entsorgungsprozess bedeuten zusaetzliche Dosis fuer Beschaeftigte

    Energy Technology Data Exchange (ETDEWEB)

    Walther, Clemens [Hannover Univ. (Germany). Inst. fuer Radiooekologie und Strahlenschutz; Riemann, Moritz [Kiel Univ. (Germany). Lehrstuhl fuer Philosophie und Ethik der Umwelt

    2017-09-01

    In the case of final nuclear waste disposal there are concurrent interests with respect to radiation protection: The realization of a disposal option with minimum required follow-up care needs time causing additional radiation exposure for the employees, also the option of long-term storage, surveillance and retrieval possibilities cause additional dose to employees. The contribution discusses possible consideration of requests for the different options.

  13. Long-term power generation expansion planning with short-term demand response: Model, algorithms, implementation, and electricity policies

    Science.gov (United States)

    Lohmann, Timo

    Electric sector models are powerful tools that guide policy makers and stakeholders. Long-term power generation expansion planning models are a prominent example and determine a capacity expansion for an existing power system over a long planning horizon. With the changes in the power industry away from monopolies and regulation, the focus of these models has shifted to competing electric companies maximizing their profit in a deregulated electricity market. In recent years, consumers have started to participate in demand response programs, actively influencing electricity load and price in the power system. We introduce a model that features investment and retirement decisions over a long planning horizon of more than 20 years, as well as an hourly representation of day-ahead electricity markets in which sellers of electricity face buyers. This combination makes our model both unique and challenging to solve. Decomposition algorithms, and especially Benders decomposition, can exploit the model structure. We present a novel method that can be seen as an alternative to generalized Benders decomposition and relies on dynamic linear overestimation. We prove its finite convergence and present computational results, demonstrating its superiority over traditional approaches. In certain special cases of our model, all necessary solution values in the decomposition algorithms can be directly calculated and solving mathematical programming problems becomes entirely obsolete. This leads to highly efficient algorithms that drastically outperform their programming problem-based counterparts. Furthermore, we discuss the implementation of all tailored algorithms and the challenges from a modeling software developer's standpoint, providing an insider's look into the modeling language GAMS. Finally, we apply our model to the Texas power system and design two electricity policies motivated by the U.S. Environment Protection Agency's recently proposed CO2 emissions targets for the

  14. Study plan for research on long-term stability of geological environments in FY2009

    International Nuclear Information System (INIS)

    Yasue, Ken-ichi; Hanamuro, Takahiro; Kokubu, Yoko; Ishimaru, Tsuneari; Umeda, Koji

    2009-09-01

    The Japanese islands lie in a region of the Circum-Pacific orogenic belt characterized by active tectonics such as volcanism and earthquakes. The concept of geological disposal of HLW in Japan is based on a multi-barrier system which consists of the engineered barrier in the stable geological environments and the natural barrier. The natural phenomena which potentially affect the geological environments in tectonically active Japan are volcanism, faulting, uplift, denudation, climatic change, and sea-level change. Investigation technologies to evaluate their long-term stability of the geological environments have been developed. In fiscal year 2009, we continue researches to develop technologies for detecting latent geotectonic events in preliminary investigation. With regard to modelling technology, we plan to develop prediction models for evaluating the changes of geological environment (e.g., thermal, hydraulic, mechanical, and geochemical conditions) for long term. In addition to these, the development of dating techniques prerequisite for these studies is also carried out. (author)

  15. Assessment of HIV molecular surveillance capacity in the European Union, 2016.

    Science.gov (United States)

    Keating, Patrick; Pharris, Anastasia; Leitmeyer, Katrin; De Angelis, Stefania; Wensing, Annemarie; Amato-Gauci, Andrew J; Broberg, Eeva

    2017-12-01

    IntroductionExpanding access to HIV antiretroviral treatment is expected to decrease HIV incidence and acquired immunodeficiency syndrome (AIDS) mortality. However, this may also result in increased HIV drug resistance (DR). Better monitoring and surveillance of HIV DR is required to inform treatment regimens and maintain the long term effectiveness of antiretroviral drugs. As there is currently no formal European Union (EU)-wide collection of HIV DR data, this study aimed to assess the current HIV molecular surveillance capacity in EU/European Economic Area (EEA) countries in order to inform the planning of HIV DR monitoring at EU level. Methods: Thirty EU/EEA countries were invited to participate in a survey on HIV molecular surveillance capacity, which also included laboratory aspects. Results: Among 21 responding countries, 13 reported using HIV sequence data (subtype and/or DR) for surveillance purposes at national level. Of those, nine stated that clinical, epidemiological and sequence data were routinely linked for analysis. Discussion/conclusion : We identified similarities between existing HIV molecular surveillance systems, but also found important challenges including human resources, data ownership and legal issues that would need to be addressed.Information on capacities should allow better planning of the phased introduction of HIV DR surveillance at EU/EEA level.

  16. Energy in 2010 - 2020. Long term challenges; Energie 2010-2020. Les defis du long terme

    Energy Technology Data Exchange (ETDEWEB)

    Dessus, Benjamin [ed.] [Centre National de la Recherche Scientifique (CNRS), 75 - Paris (France)

    2000-02-02

    This report presents the results of a workshop intending to anticipate the long term challenges, to guide better the short term power options, to understand the available political, economical and technical assumptions for the prospective world situation, to give some strategic hints on the necessary transition. Indeed, the difficult issue which the workshop tried to tackle was how should we prepare to reveal the energetic challenge of the development of the eight to ten billion inhabitants of our Planet in the next century without jeopardizing its existence. The energetic problems, a hardcore of the international preoccupation of both growth and environment, as it was recently evidenced by the climatic conference in Kyoto, have ever been the object of a particular attention on the part of General Commissariat of Plan. Thus, the commission 'Energy in 2010 - 2020' has been instituted in April 1996 in order to update the works done in 1990 - 1991 by the commission 'Energy 2010'. Soon it occurred to this new commission the task of illuminating its works by a long term (2050 - 2100) world prospective analysis of the challenges and problems linked to energy, growth and environment. In conclusion, this document tried to find answers to questions like: - which are the risks the energy consumption augmentation entail? - can we control them by appropriate urbanism and transport policies or technological innovation?. Four options for immediate action are suggested: - the energy efficiency should become a priority objective of policies; -coping with the long term challenges requires acting at present; - building the transition between governmental leadership and market; - taking profit of all the possible synergies between short and long term planning.

  17. Building 9401-2 Plating Shop Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1999-01-01

    This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes, and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S

  18. Long-term EEG in children.

    Science.gov (United States)

    Montavont, A; Kaminska, A; Soufflet, C; Taussig, D

    2015-03-01

    Long-term video-EEG corresponds to a recording ranging from 1 to 24 h or even longer. It is indicated in the following situations: diagnosis of epileptic syndromes or unclassified epilepsy, pre-surgical evaluation for drug-resistant epilepsy, follow-up of epilepsy or in cases of paroxysmal symptoms whose etiology remains uncertain. There are some specificities related to paediatric care: a dedicated pediatric unit; continuous monitoring covering at least a full 24-hour period, especially in the context of pre-surgical evaluation; the requirement of presence by the parents, technician or nurse; and stronger attachment of electrodes (cup electrodes), the number of which is adapted to the age of the child. The chosen duration of the monitoring also depends on the frequency of seizures or paroxysmal events. The polygraphy must be adapted to the type and topography of movements. It is essential to have at least an electrocardiography (ECG) channel, respiratory sensor and electromyography (EMG) on both deltoids. There is no age limit for performing long-term video-EEG even in newborns and infants; nevertheless because of scalp fragility, strict surveillance of the baby's skin condition is required. In the specific context of pre-surgical evaluation, long-term video-EEG must record all types of seizures observed in the child. This monitoring is essential in order to develop hypotheses regarding the seizure onset zone, based on electroclinical correlations, which should be adapted to the child's age and the psychomotor development. Copyright © 2015. Published by Elsevier SAS.

  19. Dynamic sensorimotor planning during long-term sequence learning: the role of variability, response chunking and planning errors.

    Science.gov (United States)

    Verstynen, Timothy; Phillips, Jeff; Braun, Emily; Workman, Brett; Schunn, Christian; Schneider, Walter

    2012-01-01

    Many everyday skills are learned by binding otherwise independent actions into a unified sequence of responses across days or weeks of practice. Here we looked at how the dynamics of action planning and response binding change across such long timescales. Subjects (N = 23) were trained on a bimanual version of the serial reaction time task (32-item sequence) for two weeks (10 days total). Response times and accuracy both showed improvement with time, but appeared to be learned at different rates. Changes in response speed across training were associated with dynamic changes in response time variability, with faster learners expanding their variability during the early training days and then contracting response variability late in training. Using a novel measure of response chunking, we found that individual responses became temporally correlated across trials and asymptoted to set sizes of approximately 7 bound responses at the end of the first week of training. Finally, we used a state-space model of the response planning process to look at how predictive (i.e., response anticipation) and error-corrective (i.e., post-error slowing) processes correlated with learning rates for speed, accuracy and chunking. This analysis yielded non-monotonic association patterns between the state-space model parameters and learning rates, suggesting that different parts of the response planning process are relevant at different stages of long-term learning. These findings highlight the dynamic modulation of response speed, variability, accuracy and chunking as multiple movements become bound together into a larger set of responses during sequence learning.

  20. Surveillance and Maintenance Plan for the Plutonium Uranium Extraction (PUREX) Facility

    International Nuclear Information System (INIS)

    Woods, P.J.

    1998-05-01

    This document provides a plan for implementing surveillance and maintenance (S ampersand M) activities to ensure the Plutonium Uranium Extraction (PUREX) Facility is maintained in a safe, environmentally secure, and cost-effective manner until subsequent closure during the final disposition phase of decommissioning. This plan has been prepared in accordance with the guidelines provided in the U.S. Department of Energy (DOE), Office of Environmental Management (EM) Decommissioning Resource Manual (DOE/EM-0246) (DOE 1995), and Section 8.6 of TPA change form P-08-97-01 to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology, et al. 1996). Specific objectives of the S ampersand M program are: Ensure adequate containment of remaining radioactive and hazardous material. Provide security control for access into the facility and physical safety to surveillance personnel. Maintain the facility in a manner that will minimize potential hazards to the public, the environment, and surveillance personnel. Provide a plan for the identification and compliance with applicable environmental, safety, health, safeguards, and security requirements

  1. LLNL Livermore site Groundwater Surveillance Plan

    International Nuclear Information System (INIS)

    1992-04-01

    Department of Energy (DOE) Order 5400.1 establishes environ-mental protection program requirements, authorities, and responsibilities for DOE operations to assume compliance with federal, state, and local environmental protection laws and regulations; Federal Executive Orders; and internal DOE policies. ne DOE Order contains requirements and guidance for environmental monitoring programs, the objectives of which are to demonstrate compliance with legal and regulatory requirements imposed by federal, state, and local agencies; confirm adherence to DOE environmental protection polices; and support environmental management decisions. The environmental monitoring programs consist of two major activities: (1) measurement and monitoring of effluents from DOE operations, and (2) surveillance through measurement, monitoring, and calculation of the effects of those operations on the environment and public health. The latter concern, that of assessing the effects, if any, of Lawrence Livermore National Laboratory (LLNL) operations and activities on on-site and off-site surface waters and groundwaters is addressed by an Environmental Surveillance Program being developed by LLNL. The Groundwater Surveillance Plan presented here has been developed on a sitespecific basis, taking into consideration facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, the extent and use of local water resources, and specific local public interest and concerns

  2. Is long-term planning obsolete? A discussion of integrated resource planning in the Pacific Northwest U.S. and a scenario for its demise

    International Nuclear Information System (INIS)

    Morlan, T.H.

    1995-01-01

    Slides presented at The Power of Change Conference in Vancouver, British Columbia, Canada in April 1995 dealing with integrated resource planning were provided. The creation of the Northwest Power Planning Council and the Northwest Power Act were described, including the goals that the the Act is expected to achieve. The Council's planning innovations were listed including the first regional integrated resource plan, a consistent and comprehensive treatment of demand side resources, and development of risk- averse plans through explicit treatment of uncertain demands. Resource planning analytical framework, modelling approach and resource strategy components were described. Major policy thrusts of the first regional power plan were presented. Factors promoting a competitive power supply industry, characteristics of that industry, and its effects on existing utilities were identified. Implications of integrated resource planning on long-term planning were assessed. A list of yet unanswered questions were appended to stimulate thought and discussion

  3. Long term planning in the hydro-thermal system - A new generation of tools. Final report; Langtidsplanlegging i hydrotermiske system - En ny generasjon verktoey. Sluttrapport

    Energy Technology Data Exchange (ETDEWEB)

    Gjelsvik, Anders; Haugstad, Arne; Honve, Ingrid; Mo, Birger

    2010-01-15

    The project 'Long term planning in the hydro-thermal system - A new generation of tools' has during the project period 2006 - 2009 led to an upgrade of stochastic models for production planning in hydro-thermal power system. The development has primarily been concentrated on ProdRisk, a model for seasonal and long-term planning in hydropower system based on the Stochastic Dual Dynamic Programming (SDDP). The project has lifted the model a long way towards operational use of seasonal planning of hydropower producers. In addition, the quality of the results from the model, makes it considered a good model also for the analysis of development projects in waterways. The report describes this and other activity within the project. Implementation of the project has contributed both to raise the level of tools used for production planning in the Nordic countries and to increase the competence of participants. (AG)

  4. A modeling framework for optimal long-term care insurance purchase decisions in retirement planning.

    Science.gov (United States)

    Gupta, Aparna; Li, Lepeng

    2004-05-01

    The level of need and costs of obtaining long-term care (LTC) during retired life require that planning for it is an integral part of retirement planning. In this paper, we divide retirement planning into two phases, pre-retirement and post-retirement. On the basis of four interrelated models for health evolution, wealth evolution, LTC insurance premium and coverage, and LTC cost structure, a framework for optimal LTC insurance purchase decisions in the pre-retirement phase is developed. Optimal decisions are obtained by developing a trade-off between post-retirement LTC costs and LTC insurance premiums and coverage. Two-way branching models are used to model stochastic health events and asset returns. The resulting optimization problem is formulated as a dynamic programming problem. We compare the optimal decision under two insurance purchase scenarios: one assumes that insurance is purchased for good and other assumes it may be purchased, relinquished and re-purchased. Sensitivity analysis is performed for the retirement age.

  5. Long-Term Stewardship At DOE's Hanford Site - 12575

    International Nuclear Information System (INIS)

    Moren, R.J.; Grindstaff, K.D.

    2012-01-01

    The U.S. Department of Energy's (DOE) Hanford Site is located in southeast Washington and consists of 1,518 square kilometers (586 square miles) of land. Established in 1943 as part of the Manhattan Project, Hanford workers produced plutonium for our nation's nuclear defense program until the mid 1980's. Since then, the site has been in cleanup mode that is being accomplished in phases. As we achieve remedial objectives and complete active cleanup, DOE will manage Hanford land under the Long-Term Stewardship (LTS) Program until completion of cleanup and the site becomes ready for transfer to the post cleanup landlord - currently planned for DOE's Office of Legacy Management (LM). We define Hanford's LTS Program in the ''Hanford Long-Term Stewardship Program Plan,'' (DOE/RL-201 0-35)(1), which describes the scope including the relationship between the cleanup projects and the LTS Program. DOE designed the LTS Program to manage and provide surveillance and maintenance (S and M) of institutional controls and associated monitoring of closed waste sites to ensure the protection of human health and the environment. DOE's Richland Operations Office (DOE-RL) and Hanford cleanup and operations contractors collaboratively developed this program over several years. The program's scope also includes 15 key activities that are identified in the DOE Program Plan (DOE/RL-2010-35). The LTS Program will transition 14 land segments through 2016. The combined land mass is approximately 570 square kilometers (220 square miles), with over 1,300 active and inactive waste sites and 3,363 wells. Land segments vary from buffer zone property with no known contamination to cocooned reactor buildings, demolished support facilities, and remediated cribs and trenches. DOE-RL will transition land management responsibilities from cleanup contractors to the Mission Support Contract (MSC), who will then administer the LTS Program for DOE-RL. This process requires an environment of cooperation

  6. Long-term climate change assessment study plan for the Hanford Site permanent isolation Barrier Development Program

    International Nuclear Information System (INIS)

    Petersen, K.L.; Chatters, J.C.; Waugh, W.J.

    1992-07-01

    The Hanford Site Permanent Isolation Barrier Development Program (Barrier Development Program) was organized to develop the technology needed to provide an in-place disposal capability for the Hanford Site (Adams and Wing 1986; Wig and Gee 1990). The goal of the Barrier Development Program is to provide defensible evidence that final barrier design(s) will adequately control water infiltration; plant and animal intrusion; and wind and water erosion for a minimum of 1,000 yr and isolate wastes from the accessible environment and warm inadvertent human intruders using markers. This document describes the long-term climate change studies planned to support the Barrier Development Program. The plan outlines a multi-year and multi-discipline approach to assess long-term climate change issues and to help optimize the design of the permanent isolation barriers. A multi-disciplinary approach to climatic data acquisition will be responsible for obtaining needed information for concurrent barrier tasks and for developing a local climate forecast model. This model will couple past climate patterns with models of regional and global climate drivers to provide bounding conditions for barrier performance assessment analyses

  7. Nursing home manager's knowledge, attitudes and beliefs about advance care planning for people with dementia in long-term care settings: a cross-sectional survey.

    Science.gov (United States)

    Beck, Esther-Ruth; McIlfatrick, Sonja; Hasson, Felicity; Leavey, Gerry

    2017-09-01

    To examine nursing home managers' knowledge, attitudes, beliefs and current practice regarding advance care planning for people with dementia in long-term care settings informed by the theory of planned behaviour. Internationally, advance care planning is advocated for people with dementia. However, evidence suggests that discussions with people with dementia are rare, particularly in long-term care settings. Whilst nursing home managers can be considered central to implementation in this setting, there is a dearth of research that has examined their perspective. This study reports on their role with regard to advance care planning and the perceived factors which influence this. A cross-sectional postal survey was carried out as part of a larger scale sequential explanatory mixed-methods study between January-March 2015. Nursing home managers in a region in the UK (n = 178). A response rate of 66% (n = 116) was achieved. Nursing home managers demonstrated a lack of knowledge of advance care planning, with negative attitudes underpinned by concerns regarding the capacity and lack of perceived benefits to the person with dementia. Currently, they do not view advance care planning as part of their role, with lack of ownership impacting upon current practice behaviours. Whilst nursing home managers recognise the potential benefits of advance care planning, barriers and challenges create a reluctance to facilitate. Targeted training to address the knowledge deficit is required, with the wider components of advance care planning promoted. There is a need for greater role clarification to ensure nurses in long-term care settings identify with the process in the future. A gap between rhetoric and reality of implementation is evident; therefore, long-term care settings must critically examine system, organisational and individual factors for failure to implement advance care planning for people with dementia. Increased cognisance of the context in which advance care

  8. The potential impact of urban growth simulation on the long-term planning of our cities

    CSIR Research Space (South Africa)

    Waldeck, L

    2012-10-01

    Full Text Available of urban growth simulation on the long-term planning of our cities 4th Biennial Conference Presented by: Dr Louis Waldeck Date: 10 October 2012 Slide 2 of 17 Why Urban Growth Simulation? ? Reduced carbon footprint ? Reduce resource consumption... of the population concentrated in cities and the opportunities to gain efficiencies, cities are the most important arena for intervention.? Maurice Strong Unabated urbanisation Quest for sustainable development What makes a city sustainable? Slide 3 of 17...

  9. Recent development of methods of long-term planning in the power economy of the GDR and trends of their future application

    International Nuclear Information System (INIS)

    Bathe, J.; Hedrich, P.

    1980-01-01

    Due to the rapid development of the power economy, the procedures of long-term planning and the necessary methods, calculation techniques and models need permanent scientific treatment. The prerequisites for the development and utilization of mathematical methods in long- and medium-term planning of power economy are characterized. The steps of development up to the establishment and utilization of a central optimization model that can be coupled and interlaced with the complex of optimization algorithms in partial fields of power economy are presented. Problems of further improvement and more effective utilization of mathematical means of planning are discussed, considering the growing interlacing of power economy decisions with those in other branches and fields of national economy. Hence, requirements of enhanced optimization of the power economy development in enlarged balance pools and for longer periods are derived. (author)

  10. The role of pressure vessel embrittlement in the long term operation of nuclear power plants

    International Nuclear Information System (INIS)

    Ballesteros, A.; Ahlstrand, R.; Bruynooghe, C.; Estorff, U. von; Debarberis, L.

    2012-01-01

    Highlights: ► Relevant open scientific issues for the long term operation of RPVs are discussed (flux effect, late blooming phases, etc.). ► Several European and American research programmes dealing with these open issues are reviewed. ► A method for consolidation and preservation of knowledge in this field is presented. - Abstract: The lack of new build of plants over the last twenty years has resulted in a switch within the industry from design, construction and development of new systems to the strengthening of safety systems and to the life extension, or long term operation (LTO), of existing reactors. The most relevant component of any nuclear power plan (NPP) is the reactor pressure vessel (RPV). This is because currently the RPV is still considered irreplaceable or prohibitively expensive to replace. This means, that if it degrades sufficiently, it could be the operational life limiting feature of the NPP. A RPV operational life of 60 years is being considered frequently by many utilities in their plant life management programmes. Areas of improvement facing long term operation are the reduction of uncertainties in the embrittlement parameters of irradiated vessels, and the development of embrittlement trend curves at high fluence levels, where surveillance data are scarce. Different techniques can be used to upgrade the surveillance programmes, as the use of miniature or reconstituted specimens and the application of best estimate assessment tools (e.g. Master Curve). Several relevant international research projects are on-going or have been proposed to clarify the material condition of long operated vessels. Knowledge management is a complementary tool, but not for it less important. The general context for LTO of RPVs is presented in this paper. Starting with a review of relevant embrittlement issues still open, followed by presenting the different techniques and tools that can be used to support LTO, and summarising the scopes of relevant European

  11. FP7 project LONGLIFE: Treatment of long-term irradiation embrittlement effects in RPV safety assessment

    International Nuclear Information System (INIS)

    May, J.; Hein, H.; Altstadt, E.; Bergner, F.; Viehrig, H.W.; Ulbricht, A.; Chaouadi, R.; Radiguet, B.; Cammelli, S.; Huang, H.; Wilford, K.

    2012-01-01

    The increasing age of European Nuclear Power Plants (NPPs) and envisaged extensions of plant lifetimes from 40 up to 80 years require an improved understanding of ageing phenomena of RPV components. The Network of Excellence NULIFE (Nuclear Plant Life Prediction) has been established to advance the safe and economic long-term operation (LTO) of NPPs by facilitating increased co-operation for applied R and D amongst members of the European nuclear community. The accurate prediction and management of RPV neutron irradiation embrittlement connected with long-term operation is an important aspect of this co-operation. Phenomena that might become important at high neutron fluences (such as flux effects and late blooming effects) have to be considered adequately in safety assessments. However, the surveillance database for prolonged irradiation times and low neutron fluxes is sparse. Consequently, there are significant uncertainties in the treatment of long-term irradiation effects. Therefore, the project LONGLIFE (Treatment of long-term irradiation embrittlement effects in RPV safety assessment) was initiated under the Euratom 7th Framework Programme of the European Commission as an umbrella project of NULIFE. LONGLIFE aims at 1) improved understanding of long-term irradiation phenomena that might compromise RPV integrity, and thereby the LTO of European NPPs, and 2) assessment of the adequacy of current prediction tools, codes, standards and surveillance guidelines for supporting long-term RPV operation. The scope of the work comprises the analysis of LTO boundary conditions; microstructural investigations and supplementary mechanical tests on RPV steels, including RPV steels from decommissioned plants; training activities; and elaboration of recommendations for RPV materials assessment and embrittlement surveillance under LTO conditions. A key part of the technical work is the selection of relevant materials for examination, e.g. which contain different weld and base

  12. Assessment of spent WWER-440 fuel performance under long-term storage conditions

    Energy Technology Data Exchange (ETDEWEB)

    Kupca, L [VUJE Inc. (Slovakia)

    2012-07-01

    In the Slovak Republic are under operation 6 units (4 in the Jaslovske Bohunice site, and 2 in the Mochovce), 2 units are under construction in Mochovce site. All units are WWER-440 type. The fresh fuel is imported from the Russian Federation. The spent fuel assemblies are stored in wet conditions in Bohunice Interim Storage Spent Fuel Facility (SFIS). By 15 July 2008, there were 8413 assemblies in SFIS. The objectives are: 1) Wet AR storage of spent fuel from the NPP Bohunice and Mochovce: Surveillance of conditions for spent fuel storage in the at-reactor (AR) storage pools of both NPP's (characteristics of pool water, corrosion product data); Visual control of storage pool components; Evaluation of storage conditions with respect to long-term stability (corrosion of fuel cladding, structural materials); 2) Wet SFIS storage at Bohunice: Measurement of spent fuel conditions during the long-term wet storage, activity data in the storage casks and amount of crud; Surveillance program for SFIS structural materials.

  13. Analysing long term discursive processes

    DEFF Research Database (Denmark)

    Horsbøl, Anders

    which extend beyond the single interaction, for instance negotiations or planning processes, seems to have played a less important role, with studies such as Iedema 2001 and Wodak 2000 as exceptions. These long term processes, however, are central to the constitution and workings of organizations......What do timescales - the notion that processes take place or can be viewed within a shorter or longer temporal range (Lemke 2005) - mean for the analysis of discourse? What are the methodological consequences of analyzing discourse at different timescales? It may be argued that discourse analysis...... in general has favored either the analysis of short term processes such as interviews, discussions, and lessons, or the analysis of non-processual entities such as (multimodal) texts, arguments, discursive repertoires, and discourses (in a Foucaultian sense). In contrast, analysis of long term processes...

  14. Towards a long-term Science Exploitation Plan for the Sea and Land Surface Temperature Radiometer on Sentinel-3 and the Along-Track Scanning Radiometers

    Science.gov (United States)

    Remedios, John J.; Llewellyn-Jones, David

    2014-05-01

    The Sea and Land Surface Temperature Radiometer (SLSTR) on Sentinel-3 is the latest satellite instrument in a series of dual-angle optical and thermal sensors, the Along-Track Scanning Radiometers (ATSRs). Operating on Sentinel-3, the SLSTR has a number of significant improvements compared to the original ATSRs including wider swaths for nadir and dual angles, emphasis on all surface temperature domains, dedicated fire channels and additional cloud channels. The SLSTR therefore provides some excellent opportunities to extend science undertaken with the ATSRs whilst also providing long-term data sets to investigate climate change. The European Space Agency, together with the Department of Energy and Climate Change, sponsored the production of an Exploitation Plan for the ATSRs. In the last year, this been extended to cover the SLSTR also. The plan enables UK and European member states to plan activities related to SLSTR in a long-term context. Covering climate change, oceanography, land surface, atmosphere and cryosphere science, particular attention is paid to the exploitation of long-term data sets. In the case of SLSTR, relevant products include sea, land, lake and ice surface temperatures; aerosols and clouds; fires and gas flares; land surface reflectances. In this presentation, the SLSTR and ATSR science Exploitation Plan will be outlined with emphasis on SLSTR science opportunities, on appropriate co-ordinating mechanisms and on example implementation plans. Particular attention will be paid to the challenges of linking ATSR records with SLSTR to provide consistent long-term data sets, and on the international context of such data sets. The exploitation plan approach to science may prove relevant and useful for other Sentinel instruments.

  15. Long-term allocation of power from the Snettisham Project

    International Nuclear Information System (INIS)

    1993-01-01

    The Alaska Power Administration (APA) has prepared an Environmental Assessment (EA) (DOE/EA-0839) evaluating the Final Marketing Plan for the Snettisham Project that establishes long-term allocation and sales of power. The proposed long-term sales contract will replace a 20-year sales agreement that expires at the end of December, 1993. The EA evaluates the proposed alternative and the no action alternative. The proposed alternative replaces the expiring contract with a new 20-year contract with the same terms, conditions and allocation as the previous long-term contract. No other alternatives were developed, as there is only one utility in the Juneau area. The divestiture of this Federal project is expected to be approved by Congress; the present contractor would then assume the ownership and operation of the Snettisham Project. The EA identified no actions associated with the proposal that will cause significant environmental or socioeconomic impacts. The Final Marketing Plan for the Snettisham Project deals with the replacement of an expiring contract. The Final Marketing Plan does not include the addition of any major new resources, service to discrete major new loads, or major changes in operating parameters. No changes in rates are proposed in the Final Marketing Plan

  16. UMTRA Project water sampling and analysis plan, Canonsburg, Pennsylvania. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Surface remedial action was completed at the US Department of Energy (DOE) Canonsburg and Burrell Uranium Mill Tailings Remedial Action (UMTRA) Project sites in southwestern Pennsylvania in 1985 and 1987, respectively. The Burrell disposal site, included in the UMTRA Project as a vicinity property, was remediated in conjunction with the remedial action at Canonsburg. On 27 May 1994, the Nuclear Regulatory Commission (NRC) accepted the DOE final Long-Term Surveillance Plan (LTSP) (DOE, 1993) for Burrell thus establishing the site under the general license in 10 CFR section 40.27 (1994). In accordance with the DOE guidance document for long-term surveillance (DOE, 1995), all NRC/DOE interaction on the Burrell site's long-term care now is conducted with the DOE Grand Junction Projects Office in Grand Junction, Colorado, and is no longer the responsibility of the DOE UMTRA Project Team in Albuquerque, New Mexico. Therefore, the planned sampling activities described in this water sampling and analysis plan (WSAP) are limited to the Canonsburg site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring at the Canonsburg site for calendar years 1995 and 1996. Currently, the analytical data further the site characterization and demonstrate that the disposal cell's initial performance is in accordance with design requirements

  17. The regional climate model as a tool for long-term planning of Quebec water resources

    International Nuclear Information System (INIS)

    Frigon, A.

    2008-01-01

    'Full text': In recent years, important progress has been made in downscaling GCM (Global Climate Model) projections to a resolution where hydrological studies become feasible. Climate change simulations performed with RCMs (Regional Climate Models) have reached a level of confidence that allows us to take advantage of this information in long-term planning of water resources. The RCMs' main advantage consist in their construction based on balanced land as well as atmosphere water and energy budgets, and on their inclusion of feedbacks between the surface and the atmosphere. Such models therefore generate sequences of weather events, providing long time series of hydro-climatic variables that are internally consistent, allowing the analysis of hydrologic regimes. At OURANOS, special attention is placed on the hydrological cycle, given its key role on socioeconomic activities. The Canadian Regional Climate Model (CRCM) was developed as a potential tool to provide climate projections at the watershed scale. Various analyses performed over small basins in Quebec provide information on the level of confidence we have in the CRCM for use in hydrological studies. Even though this approach is not free of uncertainty, it was found useful by some water resource managers and hence this information should be considered. One of the keys to retain usefulness, despite the associated uncertainties, is to make use of more than a single regional climate projection. This approach will allow for the evaluation of the climate change signal and its associated level of confidence. Such a methodology is already applied by Hydro-Quebec in the long-term planning of its water resources for hydroelectric generation over the Quebec territory. (author)

  18. Taking into account the long term dimension associated with radioactive waste management

    International Nuclear Information System (INIS)

    Schieber, C.; Schneider, T.; Lavelle, S.

    2008-01-01

    Radioactive waste introduces a new time dimension in the field of risk management. This is why, for more than 10 years, there have been reflections on the societal and organisational mechanisms allowing a responsible management over the long term of the risk associated with radioactive waste. These reflections lead one to ask questions regarding interactions between what is at stake for societal and radiation protection criteria, demanding a multidisciplinary approach to the problem. Within the framework of the European project C.O.W.A.M. 2, dedicated to the improvement of governance of radioactive waste management in Europe, a working group involving experts, authorities, waste managers, locally elected representatives and N.G.O.s, discussed the stakes associated with the long term dimension. This article presents the main results of this working group, organised around four themes: meaning of the long term and what is at stake, the ethical dimension regarding long term issues, continuity and sustainability of the surveillance and control of radioactive waste facilities, effectiveness of financing schemes for the long term management of radioactive waste. (authors)

  19. Soil and vegetation surveillance

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, E.J.

    1995-06-01

    Soil sampling and analysis evaluates long-term contamination trends and monitors environmental radionuclide inventories. This section of the 1994 Hanford Site Environmental Report summarizes the soil and vegetation surveillance programs which were conducted during 1994. Vegetation surveillance is conducted offsite to monitor atmospheric deposition of radioactive materials in areas not under cultivation and onsite at locations adjacent to potential sources of radioactivity.

  20. Portsmouth Gaseous Diffusion Plant Decontamination and Decommissioning Program surveillance and maintenance plan, FY 1993--2002

    International Nuclear Information System (INIS)

    Schloesslin, W.

    1992-11-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Portsmouth Gaseous Diffusion Plant (PORTS) is part of the Environmental Restoration (ER) and Waste Management (WM) Programs (ERWM). The objective of the ER Program is to provide PORTS the capability to meet applicable environmental regulations through facility development activities and site remedial actions. The WM Program supports the ER Program. The D ampersand D Program provides collective management of the sites within the plant which require decontamination and decommissioning, prioritizes those areas in terms of health, safety and environmental concerns, and implements the appropriate level of remedial action. The D ampersand D Program provides support to facilities which formerly served one or more of the many Plant functions. Program activities include (1) surveillance and maintenance of facilities awaiting decommissioning; (2) planning safe and orderly facility decommissioning; and (3) implementing a program to accomplish facility disposition in a safe, cost effective, and timely manner. In order to achieve the first objective, a formal plan which documents the surveillance and maintenance needs for each inactive facility has been prepared. This report provides this documentation for the PORTS facilities currently included in the D ampersand D Program and includes projected resource requirements for the planning period of FY 1993 through FY 2002

  1. Active surveillance for clinically localized prostate cancer

    DEFF Research Database (Denmark)

    Thomsen, Frederik B; Brasso, Klaus; Klotz, Laurence H

    2014-01-01

    Active surveillance (AS) has been introduced as an observational strategy to delay or avoid curative treatment without compromising long-term cancer-specific survival. The 10 studies included in this review, published between 2008 and 2013, generally agreed upon patients selection for the AS stra......Active surveillance (AS) has been introduced as an observational strategy to delay or avoid curative treatment without compromising long-term cancer-specific survival. The 10 studies included in this review, published between 2008 and 2013, generally agreed upon patients selection...

  2. Mission planning for space based satellite surveillance experiments with the MSX

    Science.gov (United States)

    Sridharan, R.; Fishman, T.; Robinson, E.; Viggh, H.; Wiseman, A.

    1994-01-01

    The Midcourse Space Experiment is a BMDO-sponsored scientific satellite set for launch within the year. The satellite will collect phenomenology data on missile targets, plumes, earth limb backgrounds and deep space backgrounds in the LWIR, visible and ultra-violet spectral bands. It will also conduct functional demonstrations for space-based space surveillance. The Space-Based Visible sensor, built by Lincoln Laboratory, Massachusetts Institute of Technology, is the primary sensor on board the MSX for demonstration of space surveillance. The SBV Processing, Operations and Control Center (SPOCC) is the mission planning and commanding center for all space surveillance experiments using the SBV and other MSX instruments. The guiding principle in the SPOCC Mission Planning System was that all routine functions be automated. Manual analyst input should be minimal. Major concepts are: (I) A high level language, called SLED, for user interface to the system; (2) A group of independent software processes which would generally be run in a pipe-line mode for experiment commanding but can be run independently for analyst assessment; (3) An integrated experiment cost computation function that permits assessment of the feasibility of the experiment. This paper will report on the design, implementation and testing of the Mission Planning System.

  3. Longitudinal study of long-term smoking behaviour by biomarker-supported determination of exposure to smoke.

    Science.gov (United States)

    Cunningham, Anthony; Sommarström, Johan; Sisodiya, Ajit S; Errington, Graham; Prasad, Krishna

    2014-04-12

    Long-term studies of smokers who switch to lower nicotine yield cigarettes have been identified by the World Health Organization Study Group TobReg and the US Food and Drug Administration as one key area where new knowledge is required to guide science based regulation. The limited number of long-term switching studies have concluded that smokers who switch to lower nicotine yield cigarettes show evidence of partial compensation. Since the European Union tobacco product directive of 2001 introduced tar and nicotine yield ceilings, there has been no long-term observational switching study. To address the limitations of previous studies where smokers were forced switched for relatively short durations, we plan to undertake a long-term study of spontaneous switching which is appropriately powered and includes non-switchers as a control group. Healthy adult smokers aged 21-64 years will be enrolled into this 5-year non-residential, multicentre study across 10 cities in Germany. They will be assessed at 10 timepoints with 6 month intervals during which inclusion criteria will be reassessed and spent cigarette filter tips, saliva and 24 h urine samples will be collected. These samples will be used to determine average daily cigarette consumption, estimate mouth-level exposure to tar and nicotine and measure selected biomarkers of exposure, respectively. Spontaneous changes in subjects' preferred cigarette products and any consequent change in tar or nicotine yield will be monitored. Subjects will be required to complete questionnaires on quality of life, smoking behaviours, smoking-related sensory attributes and recent life changes. The planned study is anticipated to contribute to understanding smokers' behaviours and their consequent exposure to smoke constituents. It will also allow assessment of compensatory changes in their behaviour following spontaneous switching of cigarette product smoked. Data from this study are expected to provide insights into study design

  4. Collectes à long terme

    CERN Multimedia

    Collectes à long terme

    2014-01-01

    En cette fin d’année 2014 qui approche à grands pas, le Comité des Collectes à Long Terme remercie chaleureusement ses fidèles donatrices et donateurs réguliers pour leurs contributions à nos actions en faveur des plus démunis de notre planète. C’est très important, pour notre Comité, de pouvoir compter sur l’appui assidu que vous nous apportez. Depuis plus de 40 ans maintenant, le modèle des CLT est basé principalement sur des actions à long terme (soit une aide pendant 4-5 ans par projet, mais plus parfois selon les circonstances), et sa planification demande une grande régularité de ses soutiens financiers. Grand MERCI à vous ! D’autres dons nous parviennent au cours de l’année, et ils sont aussi les bienvenus. En particulier, nous tenons à remercier...

  5. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  6. Planning for the Transition to Long-Term Stewardship at Three U.S. Department of Energy-Chicago Operations Office Facilities

    International Nuclear Information System (INIS)

    Moos, L. P.; Ditmars, J. D.; Heston, S. L.; Granzen, G. A.; Holzemer, M. J.; Bennett, D. B.

    2003-01-01

    This paper describes a pilot study that resulted in the generation of draft planning documents for the upcoming transition from remediation construction to long-term stewardship at three national laboratories managed by the U.S. Department of Energy (DOE)-Chicago Operations Office (CH). The remediation construction work at these facilities is being completed under the DOE's Office of Environmental Management (EM) Program. Once the remediation is complete, the responsibility for long-term stewardship (LTS) of the closed waste sites is expected to be transferred to the DOE organization responsible for managing each of the three facilities (i.e., the site landlord). To prepare for this transfer, an extensive planning effort is required. This pilot study utilized the DOE guidance in effect at the time to (1) develop a series of documents identifying applicable requirements that the LTS Programs will need to satisfy, issues that need to be resolved before the transfer can proceed, and criteria to be used to determine when active remediation is complete and a given site is ready for transfer to the LTS Program; (2) examine alternate structures for possible LTS Programs; and (3) develop draft LTS Implementation Plans. This advanced planning effort yielded a number of observations and lessons learned that are applicable to any facility approaching the end of its remediation construction phase

  7. Coral Reef Surveillance: Infrared-Sensitive Video Surveillance Technology as a New Tool for Diurnal and Nocturnal Long-Term Field Observations.

    Science.gov (United States)

    Dirnwoeber, Markus; Machan, Rudolf; Herler, Juergen

    2012-10-31

    Direct field observations of fine-scaled biological processes and interactions of the benthic community of corals and associated reef organisms (e.g., feeding, reproduction, mutualistic or agonistic behavior, behavioral responses to changing abiotic factors) usually involve a disturbing intervention. Modern digital camcorders (without inflexible land-or ship-based cable connection) such as the GoPro camera enable undisturbed and unmanned, stationary close-up observations. Such observations, however, are also very time-limited (~3 h) and full 24 h-recordings throughout day and night, including nocturnal observations without artificial daylight illumination, are not possible. Herein we introduce the application of modern standard video surveillance technology with the main objective of providing a tool for monitoring coral reef or other sessile and mobile organisms for periods of 24 h and longer. This system includes nocturnal close-up observations with miniature infrared (IR)-sensitive cameras and separate high-power IR-LEDs. Integrating this easy-to-set up and portable remote-sensing equipment into coral reef research is expected to significantly advance our understanding of fine-scaled biotic processes on coral reefs. Rare events and long-lasting processes can easily be recorded, in situ -experiments can be monitored live on land, and nocturnal IR-observations reveal undisturbed behavior. The options and equipment choices in IR-sensitive surveillance technology are numerous and subject to a steadily increasing technical supply and quality at decreasing prices. Accompanied by short video examples, this report introduces a radio-transmission system for simultaneous recordings and real-time monitoring of multiple cameras with synchronized timestamps, and a surface-independent underwater-recording system.

  8. ORNL Surplus Facilities Management Program maintenance and surveillance plan for fiscal year 1984

    International Nuclear Information System (INIS)

    Coobs, J.H.; Myrick, T.E.

    1986-10-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. The purpose and objectives of the national program are set forth in the current SFMP Program Plan and include (1) the maintenance and surveillance of facilities awaiting decommissioning, (2) planning for the orderly decommissioning of these facilities, and (3) implementation of a program to accomplish the facility disposition in a safe, cost-effective, and timely manner. As outlined in the national program plan, participating SFMP contractors are required to prepare a formal plan that documents the maintenance and surveillance (M and S) programs established for each site. This report has been prepared to provide this documentation for those facilties included in the ORNL SFMP

  9. Ground-water sample collection and analysis plan for the ground-water surveillance project

    International Nuclear Information System (INIS)

    Bryce, R.W.; Evans, J.C.; Olsen, K.B.

    1991-12-01

    The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy's (DOE's) Hanford Site in support of DOE's environmental surveillance responsibilities. The purpose of this document is to translate DOE's General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives

  10. Using Acute Flaccid Paralysis Surveillance as a Platform for Vaccine-Preventable Disease Surveillance.

    Science.gov (United States)

    Wassilak, Steven G F; Williams, Cheryl L; Murrill, Christopher S; Dahl, Benjamin A; Ohuabunwo, Chima; Tangermann, Rudolf H

    2017-07-01

    Surveillance for acute flaccid paralysis (AFP) is a fundamental cornerstone of the global polio eradication initiative (GPEI). Active surveillance (with visits to health facilities) is a critical strategy of AFP surveillance systems for highly sensitive and timely detection of cases. Because of the extensive resources devoted to AFP surveillance, multiple opportunities exist for additional diseases to be added using GPEI assets, particularly because there is generally 1 district officer responsible for all disease surveillance. For this reason, integrated surveillance has become a standard practice in many countries, ranging from adding surveillance for measles and rubella to integrated disease surveillance for outbreak-prone diseases (integrated disease surveillance and response). This report outlines the current level of disease surveillance integration in 3 countries (Nepal, India, and Nigeria) and proposes that resources continue for long-term maintenance in resource-poor countries of AFP surveillance as a platform for surveillance of vaccine-preventable diseases and other outbreak-prone diseases. © The Author 2017. Published by Oxford University Press for the Infectious Diseases Society of America.

  11. An effective surveillance strategy for reactor pressure vessel assessment in the long term operation perspective

    International Nuclear Information System (INIS)

    Chaouadi, R.; Gerard, R.

    2015-01-01

    The reactor pressure vessel (RPV) irradiation embrittlement is monitored by means of surveillance capsules containing the RPV belt-line materials, inserted inside the reactor pressure vessel (RPV) before the start of operation. These capsules are placed at location where they receive a higher neutron flux than the vessel wall, by a factor of the order of 2 to 3. They are regularly retrieved and tested to evaluate the RPV irradiation embrittlement according to specific regulatory procedures and standards, in order to guarantee the safe operation of the RPV throughout its lifetime. These procedures are often relying on empirical but conservative concepts. In parallel, material research reactor (MTR) irradiations are often used to support the surveillance data and to develop a better understanding of irradiation effects, not only qualitatively but also quantitatively. Taking advantage of the increased understanding of irradiation effects, analytical tools were developed to improve the evaluation embrittlement and quality assurance of the RPV embrittlement assessment. In this framework, an alternative but complementary surveillance program assessment was developed in Belgium, the so-called enhanced surveillance, in order to benefit from the latest developments in the area of materials science and irradiation effects. The neutron flux and fracture properties of the surveillance materials can be reliably characterized and correlated to each other using physically-based rather than empirical concepts. The enhanced surveillance approach is complementary to the mandatory regulatory procedure and allows quantifying the conservatism of the regulatory approach. The enhanced surveillance approach that uses the reconstitution technology to fabricate additional small size specimens, appropriate modeling tools and microstructural examination when required, makes it possible to rationalize all available information in a physically-based way

  12. Test plan for long-term, low-temperature oxidation of spent fuel, Series 1

    International Nuclear Information System (INIS)

    Einziger, R.E.

    1986-06-01

    Preliminary studies indicated the need for more spent fuel oxidation data in order to determine the probable behavior of spent fuel in a tuff repository. Long-term, low-temperature testing was recommended in a comprehensive technical approach to: (1) confirm the findings of the short-term thermogravimetric analyses scoping experiments; (2) evaluate the effects of variables such as burnup, atmospheric moisture and fuel type on the oxidation rate; and (3) extend the oxidation data base ot representative repository temperatures and better define the temperature dependence of the operative oxidation mechanisms. This document presents the Series 1 test plan to study, on a large number of samples, the effects of atmospheric moisture and temperature on oxidation rate and phase formation. Tests will run for up to two years, use characterized fragmented, and pulverized fuel samples, cover a temperature range of 110 0 C to 175 0 C and be conducted with an atmospheric moisture content rangeing from 0 C to approx. 80 0 C dew point. After testing, the samples will be examined and made available for leaching testing

  13. ORNL long-range environmental and waste management plan

    International Nuclear Information System (INIS)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs

  14. ORNL long-range environmental and waste management plan

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  15. A basic strategy for financing long term care.

    Science.gov (United States)

    Greenberg, J A; Leutz, W N

    1984-02-01

    As pressure mounts to contain Medicaid long term care spending, short-range "quick fixes" must be avoided. Three such false solutions in particular have shortcomings that may actually exacerbate long term care's financial dilemma because they are based on inadequate definitions of the problem. Two of these proposals--legislation to broaden family responsibility toward institutionalized elders on Medicaid and expanded state power to put liens on such elders' real property--err by trying to mandate "caring" and are predicated on a misunderstanding of the "spend-down" problem. The other proposal--to provide tax incentives to family members who care for elders--requires a large administrative apparatus, assumes an elasticity of supply that may not exist, and could disrupt the "gift relationship" on which family exchanges are often based. What is needed is a strategy with short term, intermediate, and long term objectives that move toward an insurance approach. The short term plan should lay the groundwork for intermediate strategy and control costs by changing rate-setting methods and putting limits on facility construction. The intermediate plan should change the problem's definition from one of merely controlling Medicaid long term care expenditures to one of efficiently managing state resources for the elderly through the development of state financing and local delivery systems that target older persons in greatest need. An effective means of doing this is through the creation of social/HMOs, which have five key features: integration of service responsibility and authority; flexibility in organizational design; balanced clientele; pooled prepaid funding; and financial risk for the provider organization. Finally, the long term strategy should transfer much of the long term care financial burden from individuals and state Medicaid agencies to insurance mechanisms. Many individuals would thus avoid impoverishment caused by health care spending and Medicaid would

  16. Coral Reef Surveillance: Infrared-Sensitive Video Surveillance Technology as a New Tool for Diurnal and Nocturnal Long-Term Field Observations

    Directory of Open Access Journals (Sweden)

    Juergen Herler

    2012-10-01

    Full Text Available Direct field observations of fine-scaled biological processes and interactions of the benthic community of corals and associated reef organisms (e.g., feeding, reproduction, mutualistic or agonistic behavior, behavioral responses to changing abiotic factors usually involve a disturbing intervention. Modern digital camcorders (without inflexible land-or ship-based cable connection such as the GoPro camera enable undisturbed and unmanned, stationary close-up observations. Such observations, however, are also very time-limited (~3 h and full 24 h-recordings throughout day and night, including nocturnal observations without artificial daylight illumination, are not possible. Herein we introduce the application of modern standard video surveillance technology with the main objective of providing a tool for monitoring coral reef or other sessile and mobile organisms for periods of 24 h and longer. This system includes nocturnal close-up observations with miniature infrared (IR-sensitive cameras and separate high-power IR-LEDs. Integrating this easy-to-set up and portable remote-sensing equipment into coral reef research is expected to significantly advance our understanding of fine-scaled biotic processes on coral reefs. Rare events and long-lasting processes can easily be recorded, in situ-experiments can be monitored live on land, and nocturnal IR-observations reveal undisturbed behavior. The options and equipment choices in IR-sensitive surveillance technology are numerous and subject to a steadily increasing technical supply and quality at decreasing prices. Accompanied by short video examples, this report introduces a radio-transmission system for simultaneous recordings and real-time monitoring of multiple cameras with synchronized timestamps, and a surface-independent underwater-recording system.

  17. Ex post and ex ante evaluation of the long term management plan for sole and plaice in the North Sea (part 1): ex post

    NARCIS (Netherlands)

    Miller, D.C.M.; Poos, J.J.

    2009-01-01

    This report describes the first part of an ex post and ex ante evaluation of the long term management plan for sole and plaice in the North Sea as laid out in Council Regulation (EC) No 676/2007. This plan has been in place since 2007. The plan aims to ensure, in its first stage, that the stocks of

  18. Sexuality and body image in long-term survivors of testicular cancer

    DEFF Research Database (Denmark)

    Rossen, Philip; Pedersen, Anette Fischer; Zachariae, Robert

    2012-01-01

    Hospital, Denmark, from 1990 to 2000 was conducted. A total of 401 survivors (mean age: 46.6years; response rate: 66%) completed questionnaires concerning sexuality and changes in body image. Based on the treatment received, patients were categorised into one of four groups: surveillance, radiotherapy......OBJECTIVE: This study explores sexual function and the influence of different treatment modalities on sexual function and body image among long-term survivors of testicular cancer (TCSs). METHODS: A long-term follow-up assessment of all testicular cancer patients treated at Aarhus University......, chemotherapy, or chemotherapy supplemented with retroperitoneal lymph node dissection (RPLND). RESULTS: Sexual dysfunctions were reported: 24% reduced sexual interest, 43% reduced sexual activity, 14% reduced sexual enjoyment, 18% erectile dysfunction, 7% ejaculatory problems and 3% increased sexual discomfort...

  19. Report on the possibilities of long-term storage of irradiated nuclear fuels; Rapport sur les possibilites d'entreposage a long terme de combustibles nucleaires irradies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report aims at giving a legislative aspect to the many rules that govern the activities of the back-end of the fuel cycle in France. These activities concern the unloading of spent nuclear fuels, their reprocessing, storage, recycling and definitive disposal. The following points are reviewed and commented: the management of non-immediately reprocessed fuels (historical reasons of the 'all wastes reprocessing' initial choice, evolution of the economic and political context, the future reprocessing or the definitive disposal of spent fuels in excess); the inevitable long-term storage of part of the spent fuels (quantities and required properties of long-term stored fuels, the eventuality of a definitive disposal of spent fuels); the criteria that long-term storage facilities must fulfill (confinement measures, reversibility, surveillance and control during the whole duration of the storage); storage concept to be retained (increase of storage pools capacity, long-term storage in pools of reprocessing plants, centralized storage in pools, surface dry-storage on power plant sites, reversible underground storage, subsurface storage and storage/disposal in galleries, surface dry-storage facilities); the preliminary studies for the creation of long-term storage facilities (public information, management by a public French organization, clarifying of the conditions of international circulation of spent fuels); problems linked with the presence of foreign spent fuels in France (downstream of the reprocessing cycle, foreign plutonium and wastes re-shipment); conclusions and recommendations. (J.S.)

  20. Strategic Program Planning Lessons Learned In Developing The Long-Term Stewardship Science and Technology Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, B.W.; Hanson, D.J.; Matthern, G.E.

    2003-04-24

    Technology roadmapping is a strategic planning method used by companies to identify and plan the development of technologies necessary for new products. The U.S. Department of Energy's Office of Environmental Management has used this same method to refine requirements and identify knowledge and tools needed for completion of defined missions. This paper describes the process of applying roadmapping to clarify mission requirements and identify enhancing technologies for the Long-Term Stewardship (LTS) of polluted sites after site cleanup has been completed. The nature of some contamination problems is such that full cleanup is not achievable with current technologies and some residual hazards remain. LTS maintains engineered contaminant barriers and land use restriction controls, and monitors residual contaminants until they no longer pose a risk to the public or the environment. Roadmapping was used to clarify the breadth of the LTS mission, to identify capability enhancements needed to improve mission effectiveness and efficiency, and to chart out the research and development efforts to provide those enhancements. This paper is a case study of the application of roadmapping for program planning and technical risk management. Differences between the planned and actual application of the roadmapping process are presented along with lessons learned. Both the process used and lessons learned should be of interest for anyone contemplating a similar technology based planning effort.

  1. Malaria surveillance and use of evidence in planning and decision ...

    African Journals Online (AJOL)

    PROMOTING ACCESS TO AFRICAN RESEARCH ... The objectives of this study were to (i) assess malaria surveillance system at facility and ... Results: Three district officials and 17 health facility workers from both public and private ... district is weak and utilization of evidence for planning and decision making is poor.

  2. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  3. Fukushima Daiichi. Post accident countermeasures and mid-and-long-term action plan

    International Nuclear Information System (INIS)

    Yamashita, Kazuhiko

    2012-01-01

    Since accident at Fukushima Daiichi nuclear power station, TEPCO had made strenuous efforts to maintain stable cooling of reactors and suppress discharge of radioactive materials under the cooperation of the government and others concerned. Various activities towards settlement of the accident had been done according to the roadmap proposed on April 17, 2011. This article described outlines of post accident countermeasures and current activities toward decommissioning based on mid-and-long-term action plan. Step 2 completion in roadmap towards settlement of the accident was confirmed on Dec. 16, 2011; (1) reactors: attainment of a condition equivalent to 'cold shutdown' with temperature of RPV bottom below 100degC, release of radioactive materials from PCV under control and public radiation exposure by additional release being significantly held down (evaluated as maximum 0.2 mSv/y at the site boundary), and mid-term safety of circulating water injection cooling system, (2) spent fuel pools: more stable cooling with circulating cooling system by installation of heat exchanger, (3) radioactive contaminated water: reduction of total amount with full-fledged processing facilities, desalination processing (reuse), storage and mitigation of contamination in the ocean, (4) commence construction of water shielding wall to prevent contamination of the ocean via the underground water, (5) installation of reactor building cover of unit 1 to restrain release of radioactive materials, and others. According to mid-to-long-term roadmap towards the decommissioning of Fukushima Nuclear Power Units 1-4, current activities were to (1) maintain stable reactor cooling and accumulated water processing and improve their credibility, (2) reduce the radiation impact due to additional emissions from the whole site and radioactive waste generated after the accident, (3) commence removal of fuel from the spent fuel pools (unit 4 within 2 years), (4) commence R and D and decontamination the

  4. Long-term changes and trends in the upper atmosphere - An introduction

    Czech Academy of Sciences Publication Activity Database

    Laštovička, Jan; Akmaev, R. A.; Emmert, J. T.

    2009-01-01

    Roč. 71, 14-15 (2009), s. 1511-1513 ISSN 1364-6826 Institutional research plan: CEZ:AV0Z30420517 Keywords : long-term changes * long-term trends * upper atmosphere Subject RIV: DG - Athmosphere Sciences, Meteorology Impact factor: 1.643, year: 2009 http://www.sciencedirect.com/science/journal/13646826

  5. Hanford long-term high-level waste management program overview

    International Nuclear Information System (INIS)

    Reep, I.E.

    1978-05-01

    The objective is the long-term disposition of the defense high-level radioactive waste which will remain upon completion of the interim waste management program in the mid-1980s, plus any additional high-level defense waste resulting from the future operation of N Reactor and the Purex Plant. The high-level radioactive waste which will exist in the mid-1980s and is addressed by this plan consists of approximately 3,300,000 ft 3 of damp salt cake stored in single-shell and double-shell waste tanks, 1,500,000 ft 3 of damp sludge stored in single-shell and double-shell waste tanks, 11,000,000 gallons of residual liquor stored in double-shell waste tanks, 3,000,000 gallons of liquid wastes stored in double-shell waste tanks awaiting solidification, and 2,900 capsules of 90 SR and 137 Cs compounds stored in water basins. Final quantities of waste may be 5 to 10% greater, depending on the future operation of N Reactor and the Purex Plant and the application of waste treatment techniques currently under study to reduce the inventory of residual liquor. In this report, the high-level radioactive waste addressed by this plan is briefly described, the major alternatives and strategies for long-term waste management are discussed, and a description of the long-term high-level waste management program is presented. Separate plans are being prepared for the long-term management of radioactive wastes which exist in other forms. 14 figures

  6. Causes of death in long-term survivors of non-small cell lung cancer: A regional Surveillance, Epidemiology, and End Results study.

    Science.gov (United States)

    Kanitkar, Amaraja A; Schwartz, Ann G; George, Julie; Soubani, Ayman O

    2018-01-01

    Survival from lung cancer is improving. There are limited data on the causes of death in 5-year survivors of lung cancer. The aim of this study is to explore the causes of death in long-term survivors of non-small cell lung cancer (NSCLC) and describe the odds of dying from causes other than lung cancer in this patient population. An analysis of 5-year survivors of newly diagnosed NSCLC from 1996 to 2007, in Metropolitan Detroit included in Surveillance, Epidemiology, and End Results program, was done. Of 23,059 patients identified, 3789 (16.43%) patients were alive at 5-year period (long-term survivors) and 1897 (50.06%) patients died in the later follow-up period (median 88 months; range 1-219 months). The causes of death besides lung cancer were observed in 55.2% of these patients. The most common causes of death were cardiovascular diseases (CVDs) (16%), chronic obstructive pulmonary diseases (11%), and other malignancies (8%). Patients older than 65 years, males, and those who underwent surgery for treatment of lung cancer faced a greater likelihood of death by other causes as compared to lung cancer (OR: 1.45, 95% confidence interval [CI]: 1.18-1.77; OR: 1.24, 95% CI: 1.02-1.51; and OR: 1.39, 95% CI: 1.06-1.82, respectively). Five-year survivors of NSCLC more commonly die from causes such as CVDs, lung diseases, and other malignancies. Aggressive preventive and therapeutic measures of these diseases may further improve the outcome in this patient population.

  7. Opening remarks for a panel discussion on short-term vs long-term procurement

    International Nuclear Information System (INIS)

    Courtenay, R.H.

    1990-01-01

    Long-term contracting in the late 1970's and early 1980's is blamed for some of the inequities that plague the uranium industry today. Utilities are obliged to pay prices far above prevailing levels and relatively low cost producers are forced to shut down while watching less efficient suppliers stay in business thanks to their long term supply agreements. Furthermore, it is argued that long-term contracts have contributed to supply instability by forcing the buildup of surplus inventories and by supporting excess incremental production by suppliers who have a baseload of long-term contracts. The depressed prices resulting from this oversupply are in turn jeopardizing future resource development and damaging supply reliability. In summary, the author's argument is that supply reliability will be greatly enhanced by the assurance of adequate primary supply from traditional sources such as Canada. This will not happen without long-term contracts. This conclusion may not be expected coming from a representative of Canada's largest uranium producer. But the final comment is less self serving. Many of the critics of long term contracts apparently expect a continuing and plentiful supply of East Bloc uranium to the spot market. A further question is to what extent East Bloc suppliers will eventually require long-term contracts in order to maintain production facilitates in economies that are no longer centrally planned, and where there is open competition for capital. Ultimately, reliability of supply from the non-traditional suppliers may also depend on long-term contracts

  8. Evaluating the systematic implementation of the 'Let Me Decide' advance care planning programme in long term care through focus groups: staff perspectives.

    LENUS (Irish Health Repository)

    Cornally, Nicola

    2015-11-01

    The \\'Let Me Decide\\' Advance Care Planning (LMD-ACP) programme offers a structured approach to End-of-Life (EoL) care planning in long-term care for residents with and without capacity to complete an advance care directive\\/plan. The programme was implemented in three homes in the South of Ireland, with a view to improving quality of care at end of life. This paper will present an evaluation of the systematic implementation of the LMD-ACP programme in the homes.

  9. Report on the possibilities of long-term storage of irradiated nuclear fuels; Rapport sur les possibilites d'entreposage a long terme de combustibles nucleaires irradies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report aims at giving a legislative aspect to the many rules that govern the activities of the back-end of the fuel cycle in France. These activities concern the unloading of spent nuclear fuels, their reprocessing, storage, recycling and definitive disposal. The following points are reviewed and commented: the management of non-immediately reprocessed fuels (historical reasons of the 'all wastes reprocessing' initial choice, evolution of the economic and political context, the future reprocessing or the definitive disposal of spent fuels in excess); the inevitable long-term storage of part of the spent fuels (quantities and required properties of long-term stored fuels, the eventuality of a definitive disposal of spent fuels); the criteria that long-term storage facilities must fulfill (confinement measures, reversibility, surveillance and control during the whole duration of the storage); storage concept to be retained (increase of storage pools capacity, long-term storage in pools of reprocessing plants, centralized storage in pools, surface dry-storage on power plant sites, reversible underground storage, subsurface storage and storage/disposal in galleries, surface dry-storage facilities); the preliminary studies for the creation of long-term storage facilities (public information, management by a public French organization, clarifying of the conditions of international circulation of spent fuels); problems linked with the presence of foreign spent fuels in France (downstream of the reprocessing cycle, foreign plutonium and wastes re-shipment); conclusions and recommendations. (J.S.)

  10. Vector-borne disease surveillance in livestock populations: a critical review of literature recommendations and implemented surveillance (BTV-8) in five European countries

    DEFF Research Database (Denmark)

    Dórea, Fernanda C.; Elbers, Armin R.W.; Hendrikx, Pascal

    2016-01-01

    Preparedness against vector-borne threats depends on the existence of a long-term, sustainable surveillance of vector-borne disease and their relevant vectors. This work reviewed the availability of such surveillance systems in five European countries (Denmark, France, The Netherlands, Sweden and...

  11. Long-term monitoring of UK river basins: the disconnections between the timescales of hydrological processes and watershed management planning

    Science.gov (United States)

    Howden, N. J. K.; Burt, T.; Worrall, F.

    2016-12-01

    The UK has a wealth of hydrological monitoring data that has both good coverage in space since the early 1970s, and also a few locations where records have been kept continuously for almost 150 years. Such datasets offer unique opportunities for the hydrologist to consider how the concepts of stationarity, change, and definitions of "baseline" resources should be used to shape how we build models of these systems, and how we devise appropriate and sustainable watershed management strategies. In this paper we consider some of the UK's longest hydrological and biogeochemical records, to explore how long records can be used to shape such understanding and, in some cases, how they can be used to identify new modes of behaviour that need to be incorporated into management planning, from the scale of individual watersheds right up to the national scale. We also consider how key timescales of hydrological responses that are evident within the data may pose major problems for watershed management unless appropriate attention is paid to the potential impacts of processes that work over decadal timescales - much longer than sub-decadal water industry investment cycles or short-term projects for watershed management planning. We use our long-term records to show how key processes can be identified, and to illustrate how careful interpretation of shorter term records will improve decision-making for water resource management.

  12. There is no silver bullet: the value of diversification in planning invasive species surveillance

    Science.gov (United States)

    Denys Yemshanov; Frank H. Koch; Bo Lu; D. Barry Lyons; Jeffrey P. Prestemon; Taylor Scarr; Klaus Koehler

    2014-01-01

    In this study we demonstrate how the notion of diversification can be used in broad-scale resource allocation for surveillance of invasive species. We consider the problem of short-term surveillance for an invasive species in a geographical environment.Wefind the optimal allocation of surveillance resourcesamongmultiple geographical subdivisions via application of a...

  13. Planning of Medium- and Long-Term Strategy for the Safeguards Technology Development

    International Nuclear Information System (INIS)

    Shin, Dong Hoon; Ahn, Gil Hoon; Choi, Kwan Gyu

    2009-01-01

    In Rep. of Korea, active safeguards technology development suitable to phase of a nuclear advanced country is necessary because of below reasons. First reasons are '6th ranked position in the nuclear energy generation all over the world', 'continuously increased outcomes in the various nuclear fields such as research or patent', 'strengthened intention of the new government for nuclear industries', and 'weakness of the R and D foundation related to the safeguards technology'. Second reasons are optimization necessity of the effectiveness and efficiency of safeguards according to enlargement of the SSAC (State Systems of Accounting for and Control) role. The reason of the enlargement of the SSAC is IAEA IS (Integrated Safeguards) application for Korea. Third reasons are necessity for the systematic national development plan considering the Korea R and D level and the degree of the difficulty of technology. This is to say, there is necessity of the system construction of safeguards technology development connected to the NuTRM(Nuclear Technology Road Map), integrated national nuclear energy promotion plans because of necessity for concentration of the technology level and development abilities which are spread in the industry fields, the academic world and research fields. So, in this study, the foundation of the advanced safeguards technology is provided through determining the priority of the individual technology of National Safeguards, establishing development strategy for the middle or long term of Safeguards technology, based on domestic and foreign status

  14. A branch-and-price algorithm for the long-term home care scheduling problem

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    2012-01-01

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans such that a high quality of service is maintained, the work hours of the employees are respected, and the overall cost is kept as low as possible. We...... propose a branchand-price algorithm for the long-term home care scheduling problem. The pricing problem generates a one-day plan for an employee, and the master problem merges the plans with respect to regularity constraints. The method is capable of generating plans with up to 44 visits during one week....

  15. Long term generation planning in Cyprus

    Energy Technology Data Exchange (ETDEWEB)

    Kellas, A [Electricity Authority of Cyprus, Nicosia (Cyprus)

    1997-09-01

    The Wien Automatic System Planning (WASP) model has been used for carrying out generation expansion planning studies in Cyprus since many years. This paper focuses on the problems encountered in the use of the model and illustrates these problems by means of a case study, specially developed for this purpose. Suggestions for future improvements of the model are also made in this paper. (author). 2 figs, 10 tabs.

  16. Scientific Understanding from Long Term Observations: Insights from the Long Term Ecological Research (LTER) Program

    Science.gov (United States)

    Gosz, J.

    2001-12-01

    estuaries below by removing all incoming freshwater. At Toolik Lake, long-term experiments of removing top predators from the good web of lakes showed dramatic alterations of lake populations of small fish and zooplankton. In New Mexico, LTER research on small mammal populations is successfully predicting rodent increases and the potential for increased zoonotic diseases such as Hantavirus and bubonic plague. This ability to forecast based on El Nino prediction is being used to increase scientific awareness and public health awareness through media based communication with the public. In Oregon, the Andrews Forest LTER program has had long, strong links with natural resource policy and management. Basic understanding of forest-stream interactions, characteristics of old-growth forests, roles of woody debris in temperate forest ecosystems, invertebrate biodiversity and ecosystem function have been incorporated in management guidelines, plans and regulations for public and private lands throughout the Pacific Northwest. Other examples of the values of long-term research and monitoring will be presented.

  17. Long-Term Stewardship Program Science and Technology Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Joan McDonald

    2002-09-01

    Many of the United States’ hazardous and radioactively contaminated waste sites will not be sufficiently remediated to allow unrestricted land use because funding and technology limitations preclude cleanup to pristine conditions. This means that after cleanup is completed, the Department of Energy will have long-term stewardship responsibilities to monitor and safeguard more than 100 sites that still contain residual contamination. Long-term stewardship encompasses all physical and institutional controls, institutions, information, and other mechanisms required to protect human health and the environment from the hazards remaining. The Department of Energy Long-Term Stewardship National Program is in the early stages of development, so considerable planning is still required to identify all the specific roles and responsibilities, policies, and activities needed over the next few years to support the program’s mission. The Idaho National Engineering and Environmental Laboratory was tasked with leading the development of Science and Technology within the Long-Term Stewardship National Program. As part of that role, a task was undertaken to identify the existing science and technology related requirements, identify gaps and conflicts that exist, and make recommendations to the Department of Energy for future requirements related to science and technology requirements for long-term stewardship. This work is summarized in this document.

  18. Monitoring of Sesamia nonagrioides resistance to MON 810 maize in the European Union: lessons from a long-term harmonized plan.

    Science.gov (United States)

    Farinós, Gema P; Hernández-Crespo, Pedro; Ortego, Félix; Castañera, Pedro

    2018-03-01

    Use of MON 810 maize (Zea mays), which expresses the insecticidal protein Cry1Ab from Bacillus thuringiensis (Bt maize), is a highly effective method to control Sesamia nonagrioides (Lefèbvre), a key maize pest in Mediterranean countries. Monitoring programs to assess the potential development of resistance of target pests to Bt maize are mandatory in the European Union (EU). Here we report the results of the S. nonagrioides resistance monitoring plan implemented for MON 810 maize in the EU between 2004 and 2015 and reassess the different components of this long-term harmonized plan. No major shifts in the susceptibility of S. nonagrioides to the Cry1Ab protein have occurred over time. The reassessment of this long-term program has identified some practical and technical constraints, allowing us to provide specific recommendations for improvement: use reference strains instead of susceptibility baselines as comparators for field-collected populations; shift from dose-response bioassays to diagnostic concentrations; and focus monitoring on areas with high adoption rates, such as the Ebro basin in Spain. There are no signs of field resistance of S. nonagrioides to the Cry1Ab protein of MON 810 maize. Specific recommendations for improvement are provided, based on the knowledge and experience accumulated through the implementation of this unique EU-wide harmonized plan. © 2017 Society of Chemical Industry. © 2017 Society of Chemical Industry.

  19. Long term preservation of scientific data: Lessons from jet and other domains

    International Nuclear Information System (INIS)

    Layne, R.; Capel, A.; Cook, N.; Wheatley, M.

    2012-01-01

    Highlights: ► Data from a fusion experiment must be preserved for decades, and will be required beyond the lifetime of the experiment. ► General principles of long-term data preservation have been identified in domains outside fusion. ► Key challenges are media obsolescence, data organisation, and file format obsolescence. ► Data from JET has to date been preserved for almost three decades: the steps taken to achieve this are discussed. ► Recommendations for new devices in planning for the long-term preservation of their data are made. - Abstract: All fusion devices generate large amounts of data, which must remain accessible throughout and beyond the lifetime of the device. This need for long-term data preservation creates major software and hardware challenges. Issues surrounding long-term data preservation will be discussed, and the main challenges in data curation will be outlined. The paper will then review the approaches taken at JET to ensure accessibility of all of JET's data over almost three decades. Using the JET experience and the wider context, the paper will then suggest how new experiments should plan for the long-term preservation of their data.

  20. Risk assessment in long-term storage of spent nuclear fuel

    International Nuclear Information System (INIS)

    Ahn, T.; Guttmann, J.; Mohseni, A.

    2013-01-01

    This paper presents probabilistic risk-informed approaches that the Nuclear Regulatory Commission (NRC) staff is planning to consider in preparing regulatory bases for long-term storage of spent nuclear fuel (SNF) for up to 300 years. Due to uncertainties associated with long-term SNF storage, the NRC is considering a probabilistic risk-informed approach as well as a deterministic design-based approach. The uncertainties considered here are primarily associated with materials aging of the canister and SNF in the cask system during long-term storage of SNF. This paper discusses some potential risk contributors involved in long-term SNF storage. Methods of performance evaluation are presented that assess the various types of risks involved. They include deterministic evaluation, probabilistic evaluation, and consequence assessment under normal conditions and the conditions of accidents and natural hazards. Some potentially important technical issues resulting from the consideration of a probabilistic risk-informed evaluation of the cask system performance are discussed for the canister and SNF integrity. These issues are also discussed in comparison with the deterministic approach for comparison purposes, as appropriate. Probabilistic risk-informed methods can provide insights that deterministic methods may not capture. Two specific examples include stress corrosion cracking of the canister and hydrogen-induced cladding failure. These examples are discussed in more detail, in terms of their effects on radionuclide release and nuclear subcriticality associated with the failure. The plan to consider the probabilistic risk-informed approaches is anticipated to provide helpful regulatory insights for long-term storage of SNF that provide reasonable assurance for public health and safety. (authors)

  1. Economical comparison of imported energy sources in terms of long-term production planning

    International Nuclear Information System (INIS)

    Gungor, Z.

    1999-01-01

    In this paper, the Turkish energy production sector is studied and power plants fueled by natural gas, imported coal and nuclear power are compared in terms of long-term (1996-2010) production economy. A net present value is used for comparing nuclear, coal and natural gas power plants. A scenario approach is utilized in establishing the effects of different factors, such as inflation rate, unit of investment costs, load factor change, discount rate and fuel price changes. Six different scenarios of interest are developed and discussed. The study ends with conclusions and recommendations based on a study of a reference scenario and alternative scenarios. (author)

  2. A study on the establishment of the national mid and long-term R and D plan for the nuclear technology

    International Nuclear Information System (INIS)

    Lee, Kang il; Oh, K. B.; Kim, S. W.; Won, B. C.; Park, S. G.; Kim, S. K.; Cho, S. G.; Kim, M. Y.; Jung, Y. H.

    1993-01-01

    The main objective of this study is to establish practice plan of them and to propose main R and D projects achieving the National Nuclear R and D target - becoming one of an advanced nuclear countries in the early 2000s. With this point of view, this study especially carried out the analysis of the Japanese long-term plans for nuclear power utilization and development. And we tried to propose main R and D projects with Nuclear Power Technology Relevance Tree. Also, the budget essential to the R and D plan for nuclear technology is estimated and the method to finance the budget for the next 10 years (1992-2001) has been considered in this study so as to make the national R and D plan more realistic. (Author)

  3. Nutritional surveillance.

    Science.gov (United States)

    Mason, J B; Mitchell, J T

    1983-01-01

    The concept of nutritional surveillance is derived from disease surveillance, and means "to watch over nutrition, in order to make decisions that lead to improvements in nutrition in populations". Three distinct objectives have been defined for surveillance systems, primarily in relation to problems of malnutrition in developing countries: to aid long-term planning in health and development; to provide input for programme management and evaluation; and to give timely warning of the need for intervention to prevent critical deteriorations in food consumption. Decisions affecting nutrition are made at various administrative levels, and the uses of different types of nutritional surveillance information can be related to national policies, development programmes, public health and nutrition programmes, and timely warning and intervention programmes. The information should answer specific questions, for example concerning the nutritional status and trends of particular population groups.Defining the uses and users of the information is the first essential step in designing a system; this is illustrated with reference to agricultural and rural development planning, the health sector, and nutrition and social welfare programmes. The most usual data outputs are nutritional outcome indicators (e.g., prevalence of malnutrition among preschool children), disaggregated by descriptive or classifying variables, of which the commonest is simply administrative area. Often, additional "status" indicators, such as quality of housing or water supply, are presented at the same time. On the other hand, timely warning requires earlier indicators of the possibility of nutritional deterioration, and agricultural indicators are often the most appropriate.DATA COME FROM TWO MAIN TYPES OF SOURCE: administrative (e.g., clinics and schools) and household sample surveys. Each source has its own advantages and disadvantages: for example, administrative data often already exist, and can be

  4. Long-term Strategic Planning for a Resilient Metro Colombo: An Economic Case for Wetland Conservation and Management

    Science.gov (United States)

    Rozenberg, J.

    2015-12-01

    Colombo faces recurrent floods that threaten its long-term economic development. Its urban wetlands have been identified by local agencies as a critical component of its flood reduction system, but they have declined rapidly in recent years due to continuous infilling, unmanaged land development and dredging to create lakes. In collaboration with government agencies, NGOs and local universities, the World Bank has carried out a Robust Decision Making analysis to examine the value of Colombo urban wetlands, both in the short-term and long-term, and identify what are the most viable strategies available to increase the city's flood resilience in an unclear future (in terms of climate change and patterns of urban development). This has involved the use of numerous hydrological and socio-economic scenarios as well as the evaluation of some wetlands benefits, like ecosystem services, wastewater treatment, or recreational services. The analysis has determined that if all urban wetlands across the Colombo catchment were lost, in some scenarios the metropolitan area would have to cope with an annual average flood loss of approximately 1% of Colombo GDP in the near future. For long-term strategies, trade-offs between urban development, lake creation and wetland conservation were analyzed and it was concluded that an active management of urban wetlands was the lowest regret option. Finally, the analysis also revealed that in the future, with climate change and fast urban development, wetlands will not be sufficient to protect Colombo against severe floods. Pro-active urban planning and land-use management are therefore necessary, both to protect existing wetlands and to reduce future exposure. The use of many different scenarios, the consideration of several policy options, and the open participatory process ensured policy-makers' buy-in and lead to the decision to actively protect urban wetlands in Colombo.

  5. Australia's long-term electricity demand forecasting using deep neural networks

    OpenAIRE

    Hamedmoghadam, Homayoun; Joorabloo, Nima; Jalili, Mahdi

    2018-01-01

    Accurate prediction of long-term electricity demand has a significant role in demand side management and electricity network planning and operation. Demand over-estimation results in over-investment in network assets, driving up the electricity prices, while demand under-estimation may lead to under-investment resulting in unreliable and insecure electricity. In this manuscript, we apply deep neural networks to predict Australia's long-term electricity demand. A stacked autoencoder is used in...

  6. The Great East Japan Earthquake: a need to plan for post-disaster surveillance in developed countries

    Directory of Open Access Journals (Sweden)

    Jeffrey Partridge

    2011-12-01

    Full Text Available After a devastating earthquake and tsunami struck north-eastern Japan in March 2011, the public health system, including the infectious disease surveillance system, was severely compromised. While models for post-disaster surveillance exist, they focus predominantly on developing countries during the early recovery phase. Such models do not necessarily apply to developed countries, which differ considerably in their baseline surveillance systems. Furthermore, there is a need to consider the process by which a surveillance system recovers post-disaster. The event in Japan has highlighted a need to address these concerns surrounding post-disaster surveillance in developed countries.In May 2011, the World Health Organization convened a meeting where post-disaster surveillance was discussed by experts and public health practitioners. In this paper, we describe a post-disaster surveillance approach that was discussed at the meeting, based on what had actually occurred and what may have been, or would be, ideal. Briefly, we describe the evolution of a surveillance system as it returns to the pre-existing system, starting from an event-based approach during the emergency relief phase, a syndromic approach during the early recovery phase, an enhanced sentinel approach during the late recovery phase and a return to baseline during the development phase. Our aim is not to recommend a specific model but to encourage other developed countries to initiate their own discussions on post-disaster surveillance and develop plans according to their needs and capacities. As natural disasters will continue to occur, we hope that developing such plans during the “inter-disaster” period will help mitigate the surveillance challenges that will arise post-disaster.

  7. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    International Nuclear Information System (INIS)

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date

  8. The strategic skills of business continuity managers: putting business continuity management into corporate long-term planning.

    Science.gov (United States)

    Wong, Wei Ning Zechariah

    2009-11-01

    Despite its rapid development in the last two decades, business continuity management (BCM) as a discipline and a profession is still regarded by many as an operational entity of management. Two main issues are discussed in this paper: the role of BCM in strategic management and the strategic skills of business continuity managers. These issues are crucial as they represent the role of BCM in high-level corporate management. The paper discusses the importance of BCM in the long-term planning of organisational success and the preservation of future competitiveness. Finally, salient points that underpin the importance of its role in sustaining organisational performance are addressed.

  9. Methods of nutrition surveillance in low-income countries

    Directory of Open Access Journals (Sweden)

    Veronica Tuffrey

    2016-03-01

    Full Text Available Abstract Background In 1974 a joint FAO/UNICEF/WHO Expert Committee met to develop methods for nutrition surveillance. There has been much interest and activity in this topic since then, however there is a lack of guidance for practitioners and confusion exists around the terminology of nutrition surveillance. In this paper we propose a classification of data collection activities, consider the technical issues for each category, and examine the potential applications and challenges related to information and communication technology. Analysis There are three major approaches used to collect primary data for nutrition surveillance: repeated cross-sectional surveys; community-based sentinel monitoring; and the collection of data in schools. There are three major sources of secondary data for surveillance: from feeding centres, health facilities, and community-based data collection, including mass screening for malnutrition in children. Surveillance systems involving repeated surveys are suitable for monitoring and comparing national trends and for planning and policy development. To plan at a local level, surveys at district level or in programme implementation areas are ideal, but given the usually high cost of primary data collection, data obtained from health systems are more appropriate provided they are interpreted with caution and with contextual information. For early warning, data from health systems and sentinel site assessments may be valuable, if consistent in their methods of collection and any systematic bias is deemed to be steady. For evaluation purposes, surveillance systems can only give plausible evidence of whether a programme is effective. However the implementation of programmes can be monitored as long as data are collected on process indicators such as access to, and use of, services. Surveillance systems also have an important role to provide information that can be used for advocacy and for promoting accountability for

  10. The long-term forecast of Pakistan's electricity supply and demand: An application of long range energy alternatives planning

    International Nuclear Information System (INIS)

    Perwez, Usama; Sohail, Ahmed; Hassan, Syed Fahad; Zia, Usman

    2015-01-01

    The long-term forecasting of electricity demand and supply has assumed significant importance in fundamental research to provide sustainable solutions to the electricity issues. In this article, we provide an overview of structure of electric power sector of Pakistan and a summary of historical electricity demand & supply data, current status of divergent set of energy policies as a framework for development and application of a LEAP (Long-range Energy Alternate Planning) model of Pakistan's electric power sector. Pakistan's LEAP model is used to analyze the supply policy selections and demand assumptions for future power generation system on the basis of economics, technicality and implicit environmental implications. Three scenarios are enacted over the study period (2011–2030) which include BAU (Business-As-Usual), NC (New Coal) & GF (Green Future). The results of these scenarios are compared in terms of projected electricity demand & supply, net present cost analysis (discount rate at 4%, 7% and 10%) and GHG (greenhouse gas) emission reductions, along with sensitivity analysis to study the effect of varying parameters on total cost. A concluding section illustrates the policy implications of model for futuristic power generation and environmental policies in Pakistan. - Highlights: • Pakistan-specific electricity demand model is presented. • None of the scenarios exceeded the price of 12 US Cents/kWh. • By 2030, fuel cost is the most dominant factor to influence electricity per unit cost. • By 2030, CO_2 emissions per unit electricity will increase significantly in coal scenario relative to others. • By 2030, the penetration of renewable energy and conservation policies can save 70.6 tWh electricity.

  11. Advanced surveillance technologies for used fuel long-term storage and transportation - 59032

    International Nuclear Information System (INIS)

    Tsai, Hanchung; Liu, Yung Y.; Nutt, Mark; Shuler, James

    2012-01-01

    Utilities worldwide are using dry-cask storage systems to handle the ever-increasing number of discharged fuel assemblies from nuclear power plants. In the United States and possibly elsewhere, this trend will continue until an acceptable disposal path is established. The recent Fukushima nuclear power plant accident, specifically the events with the storage pools, may accelerate the drive to relocate more of the used fuel assemblies from pools into dry casks. Many of the newer cask systems incorporate dual-purpose (storage and transport) or multiple-purpose (storage, transport, and disposal) canister technologies. With the prospect looming for very long term storage - possibly over multiple decades - and deferred transport, condition- and performance-based aging management of cask structures and components is now a necessity that requires immediate attention. From the standpoint of consequences, one of the greatest concerns is the rupture of a substantial number of fuel rods that would affect fuel retrievability. Used fuel cladding may become susceptible to rupture due to radial-hydride-induced embrittlement caused by water-side corrosion during the reactor operation and subsequent drying/transfer process, through early stage of storage in a dry cask, especially for high burnup fuels. Radio frequency identification (RFID) is an automated data capture and remote-sensing technology ideally suited for monitoring sensitive assets on a long-term, continuous basis. One such system, called ARG-US, has been developed by Argonne National Laboratory for the U.S. Department of Energy's Packaging Certification Program for tracking and monitoring drums containing sensitive nuclear and radioactive materials. The ARG-US RFID system is versatile and can be readily adapted for dry-cask monitoring applications. The current built-in sensor suite consists of seal, temperature, humidity, shock, and radiation sensors. With the universal asynchronous receiver/transmitter interface in

  12. Long-term monitoring for closed special sites

    International Nuclear Information System (INIS)

    Golchert, N.W.; Sedlet, J.

    1987-01-01

    A methodology is presented for planning and implementing a long-term environmental monitoring program for closed special radioactive waste disposal sites. The steps in the method involve collection of the available background information on the site history, site and area characteristics, waste inventory, pathway analysis, prior monitoring programs, applicable standards, and the legal/regulatory requirements. This information is coupled with factors such as experience, half-life, radionuclide migration rates, and potential hazard to develop a monitoring program. As an example, a site-specific long-term monitoring program is described for the AMAX site using the available information. Sampling techniques and practices for the monitoring program are discussed and techniques and practices expected to be available in the future are considered. 7 references, 2 tables

  13. Surveillance and Maintenance Plan for the 105-C Reactor Safe Storage Enclosure

    International Nuclear Information System (INIS)

    Logan, T. E.

    1998-01-01

    This document provides a plan for implementing surveillance and maintenance activities to ensure that the 105-C Reactor Safe Storage Enclosure is maintained in a safe, environmentally secure, and cost-effective manner until subsequent closure during the final disposition phase of decommissioning

  14. Long-term optimal energy mix planning towards high energy security and low GHG emission

    International Nuclear Information System (INIS)

    Thangavelu, Sundar Raj; Khambadkone, Ashwin M.; Karimi, Iftekhar A.

    2015-01-01

    Highlights: • We develop long-term energy planning considering the future uncertain inputs. • We analyze the effect of uncertain inputs on the energy cost and energy security. • Conventional energy mix prone to cause high energy cost and energy security issues. • Stochastic and optimal energy mix show benefits over conventional energy planning. • Nuclear option consideration reduces the energy cost and carbon emissions. - Abstract: Conventional energy planning focused on energy cost, GHG emission and renewable contribution based on future energy demand, fuel price, etc. Uncertainty in the projected variables such as energy demand, volatile fuel price and evolution of renewable technologies will influence the cost of energy when projected over a period of 15–30 years. Inaccurate projected variables could affect energy security and lead to the risk of high energy cost, high emission and low energy security. The energy security is an ability of generation capacity to meet the future energy demand. In order to minimize the risks, a generic methodology is presented to determine an optimal energy mix for a period of around 15 years. The proposed optimal energy mix is a right combination of energy sources that minimize the risk caused due to future uncertainties related to the energy sources. The proposed methodology uses stochastic optimization to address future uncertainties over a planning horizon and minimize the variations in the desired performance criteria such as energy security and costs. The developed methodology is validated using a case study for a South East Asian region with diverse fuel sources consists of wind, solar, geothermal, coal, biomass and natural gas, etc. The derived optimal energy mix decision outperformed the conventional energy planning by remaining stable and feasible against 79% of future energy demand scenarios at the expense of 0–10% increase in the energy cost. Including the nuclear option in the energy mix resulted 26

  15. An integrated stochastic multi-regional long-term energy planning model incorporating autonomous power systems and demand response

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Liu, Pei; Georgiadis, Michael C.

    2015-01-01

    The power sector faces a rapid transformation worldwide from a dominant fossil-fueled towards a low carbon electricity generation mix. Renewable energy technologies (RES) are steadily becoming a greater part of the global energy mix, in particular in regions that have put in place policies and measures to promote their utilization. This paper presents an optimization-based approach to address the generation expansion planning (GEP) problem of a large-scale, central power system in a highly uncertain and volatile electricity industry environment. A multi-regional, multi-period linear mixed-integer linear programming (MILP) model is presented, combining optimization techniques with a Monte Carlo (MCA) method and demand response concepts. The optimization goal concerns the minimization of the total discounted cost by determining optimal power capacity additions per time interval and region, and the power generation mix per technology and time period. The model is evaluated on the Greek power system (GPS), taking also into consideration the scheduled interconnection of the mainland power system with those of selected autonomous islands (Cyclades and Crete), and aims at providing full insight into the composition of the long-term energy roadmap at a national level. - Highlights: • A spatial, multi-period, long-term generation expansion planning model is presented. • A Monte-Carlo method along with a demand response mechanism are incorporated. • Autonomous power systems interconnection is considered. • Electricity and CO 2 emission trade are taken into account. • Lignite, natural gas and wind power comprise the dominant power technologies

  16. Short and long-term career plans of final year dental students in the United Arab Emirates.

    Science.gov (United States)

    Rashid, Hazim H; Ghotane, Swapnil G; Abufanas, Salem H; Gallagher, Jennifer E

    2013-08-13

    New dental schools have been established to train dentists in many parts of the world. This study examines the future dental workforce from the first dental school in the United Arab Emirates [UAE]; the aim of this study was to explore the short and long-term career aspirations of the final year dental students in the UAE in relation to their demography. Final year dental students of the Ajman University's College of Dentistry (n=87) were invited to participate in a self-completion questionnaire survey. Descriptive analysis, chi-square tests, and binary logistic regression analysis were carried out on career aspirations using SPSS v20. Eighty-two percent of students (n=71) responded, the majority of whom were female (65%; n=46). Ethnicity was reported as: 'other Arab' (61%; n=43), 'Emirati' (17%, n=12), and 'Other' (21%, n=15). In the short-term, 41% (n=29) expressed a desire to work in government training centres, with Emirati students significantly more likely to do so (p=0.002). 'Financial stability' (80%; n=57) and 'gaining professional experience' (76%; n=54) emerged as the most important influences on their short-term career plans. The vast majority of students wished to specialise in dentistry (92%; n=65) in the longer term; logistic regression analysis revealed that the odds of specialising in the most popular specialties of Orthodontics and Oral and Maxillofacial Surgery were less for the 'Other' ethnic group when compared with 'Emirati' students (0.26; 95% CI 0.068-0.989; p=0.04). Almost three-quarters of the students overall (72%; n=51) intended to work full-time. 'High income/financial security' (97%; n=69), 'standard of living' (97%; n=69), 'work/life balance' (94%; n=67), and 'professional fulfilment' (87%; n=62) were reported by the students as the most influential items affecting their long-term professional career choices. The findings suggest that students aspire to make a long-term contribution to the profession and there is a high level of

  17. Spent Fuel Long Term Interim Storage: The Spanish Policy

    International Nuclear Information System (INIS)

    Fernandez-Lopez, Javier

    2014-01-01

    ENRESA is the Spanish organization responsible for long-term management of all categories of radioactive waste and nuclear spent fuel and for decommissioning nuclear installations. It is also in charge of the management of the funds collected from waste producers and electricity consumers. The national policy about radioactive waste management is established at the General Radioactive Waste Plan by the Government upon proposal of the Ministry of Industry, Energy and Tourism. Now the Plan in force is the Sixth Plan approved in 2006. The policy on spent nuclear fuel, after description of the current available options, is set up as a long term interim storage at a Centralized Temporary Storage facility (CTS, or ATC in Spanish acronym) followed by geologic disposal, pending technological development on other options being eligible in the future. After a site selection process launched in 2009, the site for the ATC has been chosen at the end of 2011. The first steps for the implementation of the facility are described in the present paper. (authors)

  18. Mechanical properties and microstructure of long term thermal aged WWER 440 RPV steel

    Energy Technology Data Exchange (ETDEWEB)

    Kolluri, M., E-mail: kolluri@nrg.eu [Nuclear Research & Consultancy Group (NRG), P.O. Box 25, 1755 ZG Petten (Netherlands); Kryukov, A. [Scientific and Engineering Centre for Nuclear and Radiation Safety, 107140 Moscow (Russian Federation); Magielsen, A.J. [Nuclear Research & Consultancy Group (NRG), P.O. Box 25, 1755 ZG Petten (Netherlands); Hähner, P. [European Commission, Joint Research Centre, Directorate G – Nuclear Safety and Security, P.O. Box 2, 1755 ZG Petten (Netherlands); Petrosyan, V. [Armenian Scientific Research Institute for Nuclear Plant Operation (ARMATOM), 0027 Yerevan (Armenia); Sevikyan, G. [Armenian Nuclear Power Plant (ANPP), 0911, Metsamor, Armavir Marz (Armenia); Szaraz, Z. [European Commission, Joint Research Centre, Directorate G – Nuclear Safety and Security, P.O. Box 2, 1755 ZG Petten (Netherlands)

    2017-04-01

    The integrity assessment of the Reactor Pressure Vessel (RPV) is essential for the safe and Long Term Operation (LTO) of a Nuclear Power Plant (NPP). Hardening and embrittlement of RPV caused by neutron irradiation and thermal ageing are main reasons for mechanical properties degradation during the operation of an NPP. The thermal ageing-induced degradation of RPV steels becomes more significant with extended operational lives of NPPs. Consequently, the evaluation of thermal ageing effects is important for the structural integrity assessments required for the lifetime extension of NPPs. As a part of NRG's research programme on Structural Materials for safe-LTO of Light Water Reactor (LWR) RPVs, WWER-440 surveillance specimens, which have been thermal aged for 27 years (∼200,000 h) at 290 °C in a surveillance channel of Armenian-NPP, are investigated. Results from the mechanical and microstructural examination of these thermal aged specimens are presented in this article. The results indicate the absence of significant long term thermal ageing effect of 15Cr2MoV-A steel. No age hardening was detected in aged tensile specimens compared with the as-received condition. There is no difference between the impact properties of as-received and thermal aged weld metals. The upper shelf energy of the aged steel remains the same as for the as-received material at a rather high level of about 120 J. The T{sub 41} value did not change and was found to be about 10 °C. The microstructure of thermal aged weld, consisting carbides, carbonitrides and manganese-silicon inclusions, did not change significantly compared to as-received state. Grain-boundary segregation of phosphorus in long term aged weld is not significant either which has been confirmed by the absence of intergranular fracture increase in the weld. Negligible hardening and embrittlement observed after such long term thermal ageing is attributed to the optimum chemical composition of 15Cr2MoV-A for high

  19. Report on the possibilities of long-term storage of irradiated nuclear fuels

    International Nuclear Information System (INIS)

    2001-01-01

    This report aims at giving a legislative aspect to the many rules that govern the activities of the back-end of the fuel cycle in France. These activities concern the unloading of spent nuclear fuels, their reprocessing, storage, recycling and definitive disposal. The following points are reviewed and commented: the management of non-immediately reprocessed fuels (historical reasons of the 'all wastes reprocessing' initial choice, evolution of the economic and political context, the future reprocessing or the definitive disposal of spent fuels in excess); the inevitable long-term storage of part of the spent fuels (quantities and required properties of long-term stored fuels, the eventuality of a definitive disposal of spent fuels); the criteria that long-term storage facilities must fulfill (confinement measures, reversibility, surveillance and control during the whole duration of the storage); storage concept to be retained (increase of storage pools capacity, long-term storage in pools of reprocessing plants, centralized storage in pools, surface dry-storage on power plant sites, reversible underground storage, subsurface storage and storage/disposal in galleries, surface dry-storage facilities); the preliminary studies for the creation of long-term storage facilities (public information, management by a public French organization, clarifying of the conditions of international circulation of spent fuels); problems linked with the presence of foreign spent fuels in France (downstream of the reprocessing cycle, foreign plutonium and wastes re-shipment); conclusions and recommendations. (J.S.)

  20. Non-intrusive long-term monitoring approaches

    International Nuclear Information System (INIS)

    Smathers, D.; Mangan, D.

    1998-01-01

    In order to promote internatinal confidence that the US and Russia are disarming per their commitments under Article 6 of the Non-Proliferation Treaty, an international verification regime may be applied to US and Russian excess fissile materials. Initially, it is envisioned that this verification regime would be applied at storage facilities; however, it should be anticipated that the verification regime would continue throughout any material disposition activities, should such activities be pursued. once the materials are accepted into the verification regime, it is assumed that long term monitoring will be used to maintain continuity of knowledge. The requirements for long term storage monitoring include unattended operation for extended periods of time, minimal intrusiveness on the host nation's safety and security activities, data collection incorporating data authentication, and monitoring redundancy to allow resolution of anomalies and to continue coverage in the event of equipment failures. Additional requirements include effective data review and analysis processes, operation during storage facility loading, procedure for removal of inventory items for safety-related surveillance, and low cost, reliable equipment. A monitoring system might include both continuous monitoring of storagecontainers and continuous area monitoring. These would be complemented with periodic on-site inspections. A fissile material storage facility is not a static operation. The initial studies have shown there are a number of valid reasons why a host nation may need them to remove material from the storage facility. A practical monitoring system must be able to accommodate necessary material movements

  1. A new mathematical programming model for long-term production scheduling considering geological uncertainty

    OpenAIRE

    Gholamnejad, J.; Moosavi, E.

    2012-01-01

    Determination of the optimum production schedules over the life of a mine is a critical mechanism in open pit mine planning procedures. Long-term production scheduling is used to maximize the net present value of the project under technical, financial, and environmental constraints. Mathematical programming models are well suited for optimizing long-term production schedules of open pit mines. There are two approaches to solving long-term production problems: deterministic- and uncertainty- b...

  2. Engaging aboriginal peoples in Canada's plan for the long-term management of used nuclear fuel

    International Nuclear Information System (INIS)

    Patton, P.

    2011-01-01

    The interests and concerns of Aboriginal peoples are integral to development and implementation of Canada's plans for the long-term management of used nuclear fuel. The Nuclear Waste Management Organization (NWMO) has an ongoing statutory obligation and a commitment to active and meaningful participation with Aboriginal peoples. The organization has worked with Aboriginal organizations and individuals to develop long-term engagement and dialogue processes that respect traditional Aboriginal practices, culture, protocols and approaches to decision-making. Aboriginal peoples were significant participants in the 2003-2005 study that resulted in the recommendation for Adaptive Phased Management (APM). After the Canadian government agreed to proceed with APM, Aboriginal peoples provided valuable input into development of the process for selecting a site for a deep geological repository (DGR) for the long-term management of Canada's used nuclear fuel. The involvement of Aboriginal stakeholders continues to be important as Canada moves into the siting process. Engagement of Aboriginal peoples is guided by principles that respond to the unique interests, perspectives and culture of Aboriginal peoples. These principles recognize and honour the special relationship that Aboriginal peoples have with the natural environment, their unique stewardship responsibilities, and the fact that Aboriginal peoples are holders of Aboriginal Traditional Knowledge (ATK), which brings value to planning processes. The NWMO has been working with Aboriginal Elders and others to learn about ATK and to interweave this knowledge into its work. ATK includes important knowledge about the land, ecology and intergenerational decision-making. The NWMO and Aboriginal peoples have given life to engagement principles and the wisdom of ATK by collaboratively developing a number of programs including agreements with national, regional and local Aboriginal organizations. Additionally, the NWMO has

  3. Incidence of Interval Colorectal Cancer Among Inflammatory Bowel Disease Patients Undergoing Regular Colonoscopic Surveillance

    NARCIS (Netherlands)

    Mooiweer, Erik; van der Meulen-de Jong, Andrea E.; Ponsioen, Cyriel Y.; van der Woude, C. Janneke; van Bodegraven, Ad A.; Jansen, Jeroen M.; Mahmmod, Nofel; Kremer, Willemijn; Siersema, Peter D.; Oldenburg, Bas

    2015-01-01

    Surveillance is recommended for patients with long-term inflammatory bowel disease because they have an increased risk of colorectal cancer (CRC). To study the effectiveness of surveillance, we determined the incidence of CRC after negative findings from surveillance colonoscopies (interval CRC).

  4. Incidence of Interval Colorectal Cancer Among Inflammatory Bowel Disease Patients Undergoing Regular Colonoscopic Surveillance

    NARCIS (Netherlands)

    Mooiweer, E.; Maulen- de Jong, A.E. van der; Ponsioen, C.Y.; Woude, C.J. van der; Bodegraven, A.A. van; Jansen, J.M.; Mahmmod, N.; Kremer, W.; Siersema, P.D.; Oldenburg, B.

    2015-01-01

    BACKGROUND & AIMS: Surveillance is recommended for patients with long-term inflammatory bowel disease because they have an increased risk of colorectal cancer (CRC). To study the effectiveness of surveillance, we determined the incidence of CRC after negative findings from surveillance colonoscopies

  5. Historical review of long-term soil sampling for environmental surveillance at the Hanford Site and vicinity

    Energy Technology Data Exchange (ETDEWEB)

    Price, K.R.; Rickard, W.H.

    1997-08-01

    Soil samples have been collected routinely from the environs of the Hanford Site and analyzed since 1971. Correct interpretation of results depends on samples being collected from the same locations, the locations remaining relatively undisturbed, and collection and analytical procedures remaining the same or being equivalent. Historical files, documents, and annual environmental reports were reviewed to evaluate these factors. It was determined that 20 soil sampling locations, 11 onsite and 9 offsite, were established between 1971 and 1977 and represent long-term sampling locations. Sample collection and analytical procedures have remained essentially the same since 1971. The physical ecological attributes of each long-term soil sampling location were evaluated. During the review of historical records, a few results for 1970, 1971, and 1972 were noted as previously unreported in annual or special reports. These results are included in Appendix A. To complete the record, results previously reported in annual environmental reports are given in Appendix B. Global Positioning System (GPS) reading for 20 long-term soil sampling locations are provided in Appendix C.

  6. Historical review of long-term soil sampling for environmental surveillance at the Hanford Site and vicinity

    International Nuclear Information System (INIS)

    Price, K.R.; Rickard, W.H.

    1997-08-01

    Soil samples have been collected routinely from the environs of the Hanford Site and analyzed since 1971. Correct interpretation of results depends on samples being collected from the same locations, the locations remaining relatively undisturbed, and collection and analytical procedures remaining the same or being equivalent. Historical files, documents, and annual environmental reports were reviewed to evaluate these factors. It was determined that 20 soil sampling locations, 11 onsite and 9 offsite, were established between 1971 and 1977 and represent long-term sampling locations. Sample collection and analytical procedures have remained essentially the same since 1971. The physical ecological attributes of each long-term soil sampling location were evaluated. During the review of historical records, a few results for 1970, 1971, and 1972 were noted as previously unreported in annual or special reports. These results are included in Appendix A. To complete the record, results previously reported in annual environmental reports are given in Appendix B. Global Positioning System (GPS) reading for 20 long-term soil sampling locations are provided in Appendix C

  7. Structuring Diabetes Mellitus Care in Long-Term Nursing Home Residents

    LENUS (Irish Health Repository)

    Fitzpatrick, D

    2018-03-01

    Nursing home residents with diabetes have more complex care needs with higher levels of comorbidity, disability and cognitive impairment. We compared current practice in the 44 long-term residents in Peamount hospital with the standards recommended in the Diabetes UK “Good Clinical Practice Guidelines for Care Home Residents with Diabetes”. Of 44 residents, 11 were diabetic. Residents did not have specific diabetes care plans. There were some elements of good practice with a low incidence of hypoglycaemia and in-house access to dietetics and chiropody. However, diabetes care was delivered on an ad-hoc basis without individualised care plans, documented glycaemic targets, or scheduled monitoring for complications and no formal screening for diabetes on admission. National and local policy to guide management of diabetes mellitus should be developed. There should be individualised diabetes care plans, clear policies for hypoglycaemia, hyperglycaemia and long-term diabetes complications, screening on admission and increased uptake of the national retinal screening and foot care programmes.

  8. Incidence of Interval Colorectal Cancer Among Inflammatory Bowel Disease Patients Undergoing Regular Colonoscopic Surveillance

    NARCIS (Netherlands)

    Mooiweer, Erik; van der Meulen-de Jong, Andrea E.; Ponsioen, Cyriel Y.; van der Woude, C. Janneke; van Bodegraven, Ad A.; Jansen, Jeroen M.; Mahmmod, Nofel; Kremer, Willemijn; Siersema, Peter D.; Oldenburg, Bas

    2015-01-01

    Surveillance is recommended for patients with long-term inflammatory bowel disease because they have an increased risk of colorectal cancer (CRC). To study the effectiveness of surveillance, we determined the incidence of CRC after negative findings from surveillance colonoscopies (interval CRC). We

  9. Audit of long-term and short-term liabilities

    Directory of Open Access Journals (Sweden)

    Korinko M.D.

    2017-03-01

    Full Text Available The article determines the importance of long-term and short-term liabilities for the management of financial and material resources of an enterprise. It reviews the aim, objects and information generators for realization of audit of short-term and long-term obligations. The organizing and methodical providing of audit of long-term and short-term liabilities of an enterprise are generalized. The authors distinguish the stages of realization of audit of long-term and short-term liabilities, the aim of audit on each of the presented stages, and recommend methodical techniques. It is fixed that it is necessary to conduct the estimation of the systems of internal control and record-keeping of an enterprise by implementation of public accountant procedures for determination of volume and maintenance of selection realization. After estimating the indicated systems, a public accountant determines the methodology for realization of public accountant verification of long-term and short-term liabilities. The analytical procedures that public accountants are expedient to use for realization of audit of short-term and long-term obligations are determined. The authors suggest the classification of the educed defects on the results of the conducted public accountant verification of short-term and long-term obligations.

  10. Nuclear Energy, Long Term Requirements

    International Nuclear Information System (INIS)

    Knapp, V.

    2006-01-01

    status of the intermediate and long-term issues will be discussed, with special attention to the nuclear proliferation issue in view of unfavourable recent development, such as failure of 2005 NPT renewal conference and the Iran and North Korea cases. It will be argued that nuclear proliferation threat is the only really serious obstacle to the large-scale use of nuclear energy. In positive political environment solution of this problem could be possible on the lines of the very early US proposal (so called Baruch plan, UN 1946). Present political developments appear to demand renewed attempt to internationalize proliferation sensitive fuel cycle installations. Reasons will be discussed for a conviction that prospects for this may be better than in 1946. (author)

  11. USGS Workshop on Scientific Aspects of a Long-Term Experimental Plan for Glen Canyon Dam, April 10-11, 2007, Flagstaff, Arizona

    Science.gov (United States)

    ,

    2008-01-01

    Executive Summary Glen Canyon Dam is located in the lower reaches of Glen Canyon National Recreation Area on the Colorado River, approximately 15 miles upriver from Grand Canyon National Park (fig. 1). In 1992, Congress passed and the President signed into law the Grand Canyon Protection Act (GCPA; title XVIII, sec. 1801?1809, of Public Law 102-575), which seeks ?to protect, mitigate adverse impacts to, and improve the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established.? The Glen Canyon Dam Adaptive Management Program (GCDAMP) was implemented as a result of the 1996 Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to ensure that the primary mandate of the GCPA is met through advances in information and resources management (U.S. Department of the Interior, 1995). On November 3, 2006, the Bureau of Reclamation (Reclamation) announced it would develop a long-term experimental plan environmental impact statement (LTEP EIS) for operational activities at Glen Canyon Dam and other management actions on the Colorado River. The purpose of the long-term experimental plan is twofold: (1) to increase the scientific understanding of the ecosystem and (2) to improve and protect important downstream resources. The proposed plan would implement a structured, longterm program of experimentation to include dam operations, potential modifications to Glen Canyon Dam intake structures, and other management actions such as removal of nonnative fish species. The development of the long-term experimental plan continues efforts begun by the GCDAMP to protect resources downstream of Glen Canyon Dam, including Grand Canyon, through adaptive management and scientific experimentation. The LTEP EIS will rely on the extensive scientific studies that have been undertaken as part of the adaptive management program by the U.S. Geological Survey?s (USGS) Grand Canyon Monitoring and Research Center (GCMRC

  12. Long-term follow-up study and long-term care of childhood cancer survivors

    Directory of Open Access Journals (Sweden)

    Hyeon Jin Park

    2010-04-01

    Full Text Available The number of long-term survivors is increasing in the western countries due to remarkable improvements in the treatment of childhood cancer. The long-term complications of childhood cancer survivors in these countries were brought to light by the childhood cancer survivor studies. In Korea, the 5-year survival rate of childhood cancer patients is approaching 70%; therefore, it is extremely important to undertake similar long-term follow-up studies and comprehensive long-term care for our population. On the basis of the experiences of childhood cancer survivorship care of the western countries and the current Korean status of childhood cancer survivors, long-term follow-up study and long-term care systems need to be established in Korea in the near future. This system might contribute to the improvement of the quality of life of childhood cancer survivors through effective intervention strategies.

  13. Surveillance and Maintenance Plan for the Uranium Trioxide(UO3) Facility

    International Nuclear Information System (INIS)

    McGuire, J.J.

    1999-01-01

    This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure the Uranium Oxide(UO3) Facility is maintained in a safe, environmentally secure, and cost effective manner until subsequent closure during the final disposition phase of decommissioning. This plan has been prepared in accordance with the guidelines provided in the U.S. Department of Energy (DOE) Office of Environmental Management (EM) Decommissioning Resource Manual (DOE 1995) and Section 8.6 of TPA change form P-08-97-01 to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology, et al. 1996)

  14. Long-term stabilization considerations for decommissioned and reclaimed uranium sites

    International Nuclear Information System (INIS)

    Abt, S.R.; Nelson, J.D.; Johnson, T.L.

    1988-01-01

    The long-term stabilization of decommissioned uranium mill sites and of reclaimed uranium mill tailings sites encompass a broad spectrum of design capabilities. This paper presents a few of the quantitative methodologies recently developed or refined to evaluate physical factors (i.e. precipitation, fluvial geomorphology, stable slope, slope stabilization with riprap and riprap selection) that influence long-term stabilization of uranium mill and mill tailings sites. It is acknowledged that the degree of refinement of these methodologies are in their infancy and that extensive research and development are warranted to increase the level of assurance. However, these methodologies provide an initial guideline for evaluating long-term stabilization that has not been previously existed. The purpose of this paper is to present a review of currently available state-of-the-art engineering techniques and methodologies for the evaluation of reclamation plans designed to provide long-term stability against potential failure modes. In some cases, evaluative techniques have been developed for long-term stabilization where methodologies have not previously existed. Each methodology to be presented represents a starting point upon which additional research and/or development may be warranted

  15. Surveillance Plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-12-01

    This Surveillance Plan has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model The baseline monitoring phase is expected to begin in 1994 and continue for 12--18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC The routine annual monitoring phase will continue for ∼4 years after completion of the baseline monitoring phase. This Surveillance Plan presents the technical and quality assurance surveillance activities for the various WAG 6 environmental monitoring and data evaluation plans and implementing procedures

  16. Environmental implications of electricity generation in an integrated long-term planning framework

    International Nuclear Information System (INIS)

    Turner, Graham M.; West, James

    2012-01-01

    Long-term, integrated modelling of electricity generation capacity and its operational requirements is important for coherent energy policy because of the multi-decadal lifespan of such plant, and because related fuel requirements, water consumption, and greenhouse gas emissions impact other sectors. This paper describes a physical model of electricity generation designed for long-term simulations, including the reproduction of decades of historical data, and its application to key policy questions. The simulation uses a dynamic, physical input–output model for the basic material and energy industries, embedded in an economy-wide stocks and flows framework (SFF). The historical reproduction, illustrated for the state of Victoria, is based on integrating bottom-up technical data on physical processes as inputs, and validating output against top-down aggregate data. We show that while greenhouse gas emissions would decrease significantly with the aggressive introduction of cleaner generation technology, long-term reductions are difficult to maintain against ongoing growth in consumption. Additionally, our sensitivity analysis identifies the importance of rapid action due to the age structure of operating power stations. We also identify significant imposts of alternative power generation on land and water resources, though a business-as-usual scenario would impose greater losses of water resources. - Highlights: ► System-wide dynamic analysis is needed to avoid unintended adverse environmental outcomes. ► Dynamics of long-lived plant is important in transitions for reducing greenhouse gas emissions. ► Large gains in GHG emissions efficiency of generation portfolios fail to maintain low emissions.

  17. Long-term planning frame of controlled fusion research in the Federal Republic of Germany and within the scope of EURATOM

    International Nuclear Information System (INIS)

    1989-01-01

    Current R and D activities in the field of controlled nuclear fusion are investigating physics and technological problems rather than economic efficiency aspects of future fusion reactor systems. The report in hand compares the long-term plans and programmes set up on the European level with other countries' programmes, explains the international cooperative framework and activities, and goes into details of the Federal German research programme. Aspects of safety and environmental impacts are discussed. (HP) [de

  18. Planning ahead : although Canada could experience a shortage of some 300,000 workers within the next 20 years, long-term strategies can help companies cope : part 2

    International Nuclear Information System (INIS)

    Cook, D.

    2007-01-01

    This article is the second in a 2-part series examining the impacts of the labour shortage in the energy industry. Most oil and gas companies are implementing long-term strategies in order to deal with the anticipated labour crisis. Labour, material, services and other factors are taken into consideration when developing business plans, and industry will adjust projects accordingly to accommodate labour constraints and uneconomic cost environments. Companies are collecting and analyzing data in order to define strategies to address retirement and longer-term workforce planning issues. EnCana is supporting a heavy equipment operator training program jointly with the government of British Columbia to help recruit aboriginal communities. EnCana is also recognizing the value of new immigrant professionals and has identified the group as an emerging recruitment talent pool. Shell Canada's long term plans for recruiting experienced staff include dedicating significant resources to a campus recruitment campaign, and connecting with Royal Dutch Shell to extend their recruitment reach. Shell Canada is also strengthening its on-boarding program for both new permanent full-time and part-time employees. The company recently announced its largest single community investment in the Northern Alberta Institute of Technology's Building on Demand campaign. The $3 million will be used to create the Shell Manufacturing Centre, as well as to provide bursaries for students pursuing apprenticeships and technical training. Petro-Canada's long-term recruitment strategy includes continually identifying and bringing in talented employees to meet the company's business goals. Devon Canada is also focusing on career path development and has established significant budgets for training and professional development. It was concluded that employers in the oil and gas industry must develop effective recruitment strategies to attract and retain critical talent for the short and long term, and not

  19. Long-term planning in Small Islands Developing States under a changing climate

    Science.gov (United States)

    Rozenberg, J.

    2017-12-01

    This paper presents an analytical framework and decision-making tool tailored to Small Islands Developing States (SIDS), to help them address future climate change challenges. SIDS are a diverse group of countries but all characterized by insularity, geographic remoteness, small economy and population size. SIDS are highly exposed and vulnerable to natural disasters, with average annual losses between 1 and 10% of GDP depending on the country. Vulnerability in SIDS is worsened by poor development planning and the countries' limited ability to respond and manage the risks. Infrastructure is a large share of the fixed capital stock in SIDS, most infrastructure assets are highly critical due to the lack of redundancy in networks and they are often highly vulnerable to natural hazards. Remoteness means that when infrastructure assets are damaged, reconstruction costs are larger than anywhere else, which narrows fiscal space, which in turn leads to deferred maintenance problems and raises the vulnerability to future events. In this context, and with climate change worsening the challenges SIDS face at an uncertain pace and intensity, decision-makers and international donors have to answer difficult questions. Does it make sense to spend increasing amounts of money in infrastructure given the level of debts SIDS face and the economic losses resulting from the regular disruption of infrastructure assets? How should sectors be prioritized? Should long-term plans consider "migration with dignity" as a potential option, especially for low-lying atolls? To help answer these questions, methods for decision-making under deep uncertainty, which rely on large numbers of model runs to identify the vulnerabilities of strategies, are particularly appropriate. The small population size of SIDS and simplicity of their infrastructure networks allows building system models coupled with household surveys and testing a range of different policy options, including unconventional policies

  20. New Developments in Long-Term Downhole Monitoring Arrays

    Directory of Open Access Journals (Sweden)

    Jochem Kück

    2006-03-01

    Full Text Available The long-term observation of active geological processes is a major research goal in an increasing number of scientific drilling projects. An extended monitoring phase within a potentially hostile environment (e.g., temperature, pressure, salinity requires new long-lasting and robust instrumentation currently unavailable from either industry or academia. Extended exposure of instrument packages to extreme conditions will typically cause seals to weaken and fail,electronic parts to break under permanent load, and sensors to degrade or develop strong drift. In the framework of scientific exploration, there are currently several major research projects targeting fault zone drilling and in situ measurements to monitor physical and chemical conditions before, during, and after seismic events. Planning has now begun for tool development, testing, and continuous long-term monitoring for the San Andreas Fault Zone Observatory at Depth, SAFOD (Parkfi eld, Calif., U.S.A.; See article on page 32..

  1. Long-term care insurance matures as a benefit.

    Science.gov (United States)

    Davis, Elaine; Leach, Tom

    2002-12-01

    Forty-eight percent of U.S. businesses now offer long-term care insurance (LTCI) coverage, an increase of 15% since 1998. As more organizations realize the added value of LTCI in the employee benefit package, they have also found that motivation to buy varies with employee financial standing, gender and age, and that targeted employee education as part of retirement planning is essential.

  2. A study on making a long-term improvement in the national energy efficiency and GHG control plans by the AHP approach

    International Nuclear Information System (INIS)

    Lee, Seong Kon; Yoon, Yong Jin; Kim, Jong Wook

    2007-01-01

    Owing to the expiration of the national 10-year period plan and the establishment of an efficient energy and resource technology R and D system, the Korean government needs to make a strategic long-term national energy and resource technology R and D plan (NERP) to cope with forthcoming 10-year period. A new NERP aims to improve the energy intensity, reduce the emissions of greenhouse gas within the United Nations framework convention on climate change (UNFCCC), and contribute to the construction of an advanced economic system. We determine the priorities in technology development for the energy efficiency and greenhouse gas control plans (EGCP), which are parts of a new NERP, by using the AHP approach for the first time. We suggest a scientific procedure to determine the priorities in technology development by using AHP

  3. High-level Waste Long-term management technology development

    International Nuclear Information System (INIS)

    Choi, Jong Won; Kang, C. H.; Ko, Y. K.

    2012-02-01

    The purpose of this project is to develop a long-term management system(A-KRS) which deals with spent fuels from domestic nuclear power stations, HLW from advanced fuel cycle and other wastes that are not admitted to LILW disposal site. Also, this project demonstrate the feasibility and reliability of the key technologies applied in the A-KRS by evaluating them under in-situ condition such as underground research laboratory and provide important information to establish the safety assessment and long-term management plan. To develop the technologies for the high level radioactive wastes disposal, demonstrate their reliability under in-situ condition and establish safety assessment of disposal system, The major objects of this project are the following: Ο An advanced disposal system including waste containers for HLW from advanced fuel cycle and pyroprocess has been developed. Ο Quantitative assessment tools for long-term safety and performance assessment of a radwaste disposal system has been developed. Ο Hydrological and geochemical investigation and interpretation methods has been developed to evaluate deep geological environments. Ο The THMC characteristics of the engineered barrier system and near-field has been evaluated by in-situ experiments. Ο The migration and retardation of radionuclides and colloid materials in a deep geological environment has been investigated. The results from this project will provide important information to show HLW disposal plan safe and reliable. The knowledge from this project can also contribute to environmental conservation by applying them to the field of oil and gas industries to store their wastes safe

  4. Safety and efficacy of ipragliflozin in Japanese patients with type 2 diabetes in real-world clinical practice: interim results of the STELLA-LONG TERM post-marketing surveillance study.

    Science.gov (United States)

    Nakamura, Ichiro; Maegawa, Hiroshi; Tobe, Kazuyuki; Tabuchi, Hiromi; Uno, Satoshi

    2018-02-01

    Data regarding the efficacy and safety of sodium-glucose cotransporter 2 inhibitors in the real-world setting in Japan are limited. The STELLA-LONG TERM study is an ongoing 3-year post-marketing surveillance study of ipragliflozin in type 2 diabetes (T2D) patients. Here, we report the interim results (including 3-, 12-, and 24-month data). All Japanese patients with T2D who were first prescribed ipragliflozin between 17 July 2014 and 16 October 2015 at participating centers in Japan were registered in STELLA-LONG TERM. At 3, 12, and 24 months, the safety analysis set comprised 11,053, 5475, and 138 patients, respectively; the efficacy analysis set comprised 8757 patients. Ipragliflozin treatment resulted in statistically significant improvements versus baseline in hemoglobin A1c, fasting plasma glucose concentration, body weight, blood pressure, heart rate, and serum concentrations of low-density lipoprotein cholesterol and triglycerides. The adverse drug reaction incidence rate was 10.71%, the most common reactions being renal and urinary disorders (5.06%), infections and infestations (1.24%), and skin and subcutaneous tissue disorders (1.14%). Ipragliflozin was well tolerated and effective in Japanese patients with T2D; no new safety issues were identified.

  5. Reduction of radiation area project plan

    International Nuclear Information System (INIS)

    1979-08-01

    This plan deals with the overall reduction of outdoor surface radiation areas under Rockwell's jurisdiction. Four basic alternatives are identified which will reduce and/or stabilize radiation areas until long-term disposal decisions are made: (1) continued routine surveillance and maintenance; (2) reduction or elimination of effluent discharges; (3) improved site stabilization; and (4) site removal. The four major transport mechanisms at Hanford that are the primary forces for contamination spread are identified as wind, animal transport, concentration and dispersal by plants, and transport resulting from human activities

  6. [Long-term psychiatric hospitalizations].

    Science.gov (United States)

    Plancke, L; Amariei, A

    2017-02-01

    Long-term hospitalizations in psychiatry raise the question of desocialisation of the patients and the inherent costs. Individual indicators were extracted from a medical administrative database containing full-time psychiatric hospitalizations for the period 2011-2013 of people over 16 years old living in the French region of Nord-Pas-de-Calais. We calculated the proportion of people who had experienced a hospitalization with a duration of 292 days or more during the study period. A bivariate analysis was conducted, then ecological data (level of health-care offer, the deprivation index and the size of the municipalities of residence) were included into a multilevel regression model in order to identify the factors significantly related to variability of long-term hospitalization rates. Among hospitalized individuals in psychiatry, 2.6% had had at least one hospitalization of 292 days or more during the observation period; the number of days in long-term hospitalization represented 22.5% of the total of days of full-time hospitalization in psychiatry. The bivariate analysis revealed that seniority in the psychiatric system was strongly correlated with long hospitalization rates. In the multivariate analysis, the individual indicators the most related to an increased risk of long-term hospitalization were: total lack of autonomy (OR=9.0; 95% CI: 6.7-12.2; P<001); diagnoses of psychological development disorders (OR=9.7; CI95%: 4.5-20.6; P<.001); mental retardation (OR=4.5; CI95%: 2.5-8.2; P<.001): schizophrenia (OR=3.0; CI95%: 1.7-5.2; P<.001); compulsory hospitalization (OR=1.7; CI95%: 1.4-2.1; P<.001); having experienced therapeutic isolation (OR=1.8; CI95%: 1.5-2.1; P<.001). Variations of long-term hospitalization rates depending on the type of establishment were very high, but the density of hospital beds or intensity of ambulatory activity services were not significantly linked to long-term hospitalization. The inhabitants of small urban units had

  7. Long-term observation of the geological environment: needs and techniques

    International Nuclear Information System (INIS)

    1993-01-01

    For site characterization programmes aimed at determining the suitability of sites for the disposal of radioactive waste, attention must be given to collecting data over long periods of time for adequate understanding of certain processes in the geological environment (hydrologic conditions, seismicity etc.). It is important for all national projects to carefully plan and implement programmes to observe the long-term behaviour of the geological environment in order to secure high-quality, reliable data for use in safety assessments. These proceedings present the results of a workshop organized to discuss the needs and techniques related to the planning and implementation of such programmes. 13 papers have been presented

  8. Williamsport Area Community College Long Range Planning: The Long Range Plan, Update 1987.

    Science.gov (United States)

    Williamsport Area Community Coll., PA.

    This update to Williamsport Area Community College's (WACC's) 1984-89 long-range plan offers a status report on each of the plan's 78 objectives, reassigns responsibility for specific objectives to make the plan responsive to the current organizational structure of the college, and offers 11 new objectives for the 1986-87 academic year. After…

  9. A Comprehensive Plan for the Long-Term Calibration and Validation of Oceanic Biogeochemical Satellite Data

    Science.gov (United States)

    Hooker, Stanford B.; McClain, Charles R.; Mannino, Antonio

    2007-01-01

    The primary objective of this planning document is to establish a long-term capability and validating oceanic biogeochemical satellite data. It is a pragmatic solution to a practical problem based primarily o the lessons learned from prior satellite missions. All of the plan's elements are seen to be interdependent, so a horizontal organizational scheme is anticipated wherein the overall leadership comes from the NASA Ocean Biology and Biogeochemistry (OBB) Program Manager and the entire enterprise is split into two components of equal sature: calibration and validation plus satellite data processing. The detailed elements of the activity are based on the basic tasks of the two main components plus the current objectives of the Carbon Cycle and Ecosystems Roadmap. The former is distinguished by an internal core set of responsibilities and the latter is facilitated through an external connecting-core ring of competed or contracted activities. The core elements for the calibration and validation component include a) publish protocols and performance metrics; b) verify uncertainty budgets; c) manage the development and evaluation of instrumentation; and d) coordinate international partnerships. The core elements for the satellite data processing component are e) process and reprocess multisensor data; f) acquire, distribute, and archive data products; and g) implement new data products. Both components have shared responsibilities for initializing and temporally monitoring satellite calibration. Connecting-core elements include (but are not restricted to) atmospheric correction and characterization, standards and traceability, instrument and analysis round robins, field campaigns and vicarious calibration sites, in situ database, bio-optical algorithm (and product) validation, satellite characterization and vicarious calibration, and image processing software. The plan also includes an accountability process, creating a Calibration and Validation Team (to help manage

  10. Long-term potentiation and long-term depression: a clinical perspective

    Directory of Open Access Journals (Sweden)

    Timothy V.P. Bliss

    2011-01-01

    Full Text Available Long-term potentiation and long-term depression are enduring changes in synaptic strength, induced by specific patterns of synaptic activity, that have received much attention as cellular models of information storage in the central nervous system. Work in a number of brain regions, from the spinal cord to the cerebral cortex, and in many animal species, ranging from invertebrates to humans, has demonstrated a reliable capacity for chemical synapses to undergo lasting changes in efficacy in response to a variety of induction protocols. In addition to their physiological relevance, long-term potentiation and depression may have important clinical applications. A growing insight into the molecular mechanisms underlying these processes, and technological advances in non-invasive manipulation of brain activity, now puts us at the threshold of harnessing long-term potentiation and depression and other forms of synaptic, cellular and circuit plasticity to manipulate synaptic strength in the human nervous system. Drugs may be used to erase or treat pathological synaptic states and non-invasive stimulation devices may be used to artificially induce synaptic plasticity to ameliorate conditions arising from disrupted synaptic drive. These approaches hold promise for the treatment of a variety of neurological conditions, including neuropathic pain, epilepsy, depression, amblyopia, tinnitus and stroke.

  11. Still-Born Autonomy Insurance Plan in Quebec: An Example of a Public Long-Term Care Insurance System in Canada.

    Science.gov (United States)

    Hébert, Réjean

    2016-01-01

    Funding long-term care (LTC) is a challenge under the existing Beveridgean universal healthcare system. The Autonomy Insurance (AI) plan developed in Quebec was an attempt to introduce public LTC insurance into our healthcare system. The AI benefit was based on an assessment of the needs of older people and those with disabilities using a disability scale (SMAF) and case-mix classification system (Iso-SMAF Profiles). Under the plan, the benefit would be used to fund public institutions or purchase services from private organizations. Case managers were responsible for assessments and helping users and their families plan services and decide how to use the AI benefit. Funding AI was based on general tax revenues without capitalized funding, under a separate protected budget program. Projections were made for the additional budget needed to support AI, which would have mitigated the forecast increase in LTC spending due to population aging. All the legal, administrative, funding, training and contractual issues were dealt with, for implementation of the plan in April 2015. Unfortunately, the project was still-born for political reasons, but it demonstrates the feasibility of this essential innovation for Canada.

  12. The long-term management of nuclear emergencies: The principles

    International Nuclear Information System (INIS)

    Baverstock, K.; Cherp, A.; Gray, P.

    2004-01-01

    The long-term impact of the Chernobyl accident on the most affected populations in Belarus (Ukraine)) and the Russian Federation is still evident in terms of a continuing elevated level of thyroid cancer, prominent psychosocial effects, a depressed economy and a low level of well being. Some of these impacts are directly and primarily attributable to exposure to ionising radiation, while others have more complex origins and have evolved over the period since the accident. It is argued that although these latter impacts were largely unpredictable at the time of the accident, they could have been minimised had an appropriate management plan been in force. The principles underlying such a management plan for use in future accidents are enumerated. An essential component in further developing such a plan would be a thorough review of the experience of the Chernobyl accident in order to 'learn the lessons' that accident holds. (authors)

  13. Duplex ultrasound surveillance after carotid artery endarterectomy.

    Science.gov (United States)

    Al Shakarchi, Julien; Lowry, Danielle; Nath, Jay; Khawaja, Aurangzaib Z; Inston, Nicholas; Tiwari, Alok

    2016-06-01

    After carotid endarterectomy (CEA), patients have been regularly followed up by duplex ultrasound imaging. However, the evidence for long-term follow-up is not clear, especially if the results from an early duplex scan are normal. This study assessed and systematically reviewed the evidence base for long-term surveillance after CEA and a normal early scan. Electronic databases were searched for studies assessing duplex surveillance after CEA in accordance with Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines. The primary outcome for this study was the incidence of restenosis after a normal early scan. The secondary outcome was the number of reinterventions after a normal early scan. The review included seven studies that reported 2317 procedures. Of those patients with a normal early scan, 2.8% (95% confidence interval, 0.7%-6%) developed a restenosis, and 0.4% (95% confidence interval, 0%-0.9%) underwent a reintervention for their restenosis during the follow-up period. This review confirms that routine postoperative duplex ultrasound surveillance after CEA is not necessary if the early duplex scan is normal. Copyright © 2016 Society for Vascular Surgery. Published by Elsevier Inc. All rights reserved.

  14. Application of a Long Term Asset Management Strategy for HP Feedwater Heaters

    International Nuclear Information System (INIS)

    Won, Se Youl; Yun, Eun Sub; Park, Young Sheop

    2008-01-01

    As the commercial operating year of nuclear power plants is increased, it becomes imperative to develop integrated cost-effective asset management and to improve plans for degraded Structures, Systems, and Components (SSCs) in terms of safety and economical consideration. A long-term asset management (LTAM) strategy can improve the condition of nuclear plants, maximize their value, and optimize their operational life by maintaining their safety. This paper presents an optimized LTAM plan for HP feedwater heaters at a specific nuclear power plant

  15. Interval linear programming model for long-term planning of vehicle recycling in the Republic of Serbia under uncertainty.

    Science.gov (United States)

    Simic, Vladimir; Dimitrijevic, Branka

    2015-02-01

    An interval linear programming approach is used to formulate and comprehensively test a model for optimal long-term planning of vehicle recycling in the Republic of Serbia. The proposed model is applied to a numerical case study: a 4-year planning horizon (2013-2016) is considered, three legislative cases and three scrap metal price trends are analysed, availability of final destinations for sorted waste flows is explored. Potential and applicability of the developed model are fully illustrated. Detailed insights on profitability and eco-efficiency of the projected contemporary equipped vehicle recycling factory are presented. The influences of the ordinance on the management of end-of-life vehicles in the Republic of Serbia on the vehicle hulks procuring, sorting generated material fractions, sorted waste allocation and sorted metals allocation decisions are thoroughly examined. The validity of the waste management strategy for the period 2010-2019 is tested. The formulated model can create optimal plans for procuring vehicle hulks, sorting generated material fractions, allocating sorted waste flows and allocating sorted metals. Obtained results are valuable for supporting the construction and/or modernisation process of a vehicle recycling system in the Republic of Serbia. © The Author(s) 2015.

  16. Long-range plan for buried transuranic waste studies at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Berreth, P.D.; Fischer, D.K.; Suckel, R.A.

    1984-11-01

    This document presents a plan to perform detailed studies of alternatives considered for the long-term management of buried transuranic waste at the INEL. The studies will provide the technical basis for DOE to make a decision on the future management of that waste. Although the waste is currently being handled in an acceptable manner, new solutions are continually being researched to improve handling techniques. Three alternatives are being considered: (a) leave the waste as is; (b) improve in situ confinement of the waste; (c) retrieve, process, and certify the waste for disposal at a federal repository. Fifteen studies are described in this plan for the latter two alternatives. The leave-as-is alternative involves continuing present procedures for managing the buried waste. An ongoing environmental surveillance program, a low-level-waste stabilization program, and enhanced subsurface migration studies begun in FY-1984 at the INEL will provide data for the decision-making process for INEL buried TRU waste. These ongoing studies for the leave-as-is alternative are summarized in this plan in limited detail. The improved-confinement alternative involves leaving the waste in place, but providing additional protection against wind water penetration, erosion, and plant and animal intrusion. Several studies proposed will examine special techniques to immobilize or encapsulate the buried waste. Studies of the third alternative will investigate improved retrieval, processing and certification techniques. New equipment, such as industrial manipulators and excavating machinery, will be tested in the retrieval studies. Processing and certification studies will examine rapidly changing or new technologies. 19 references, 8 figures, 4 tables

  17. An Integrated Modeling Approach for Forecasting Long-Term Energy Demand in Pakistan

    OpenAIRE

    Syed Aziz Ur Rehman; Yanpeng Cai; Rizwan Fazal; Gordhan Das Walasai; Nayyar Hussain Mirjat

    2017-01-01

    Energy planning and policy development require an in-depth assessment of energy resources and long-term demand forecast estimates. Pakistan, unfortunately, lacks reliable data on its energy resources as well do not have dependable long-term energy demand forecasts. As a result, the policy makers could not come up with an effective energy policy in the history of the country. Energy demand forecast has attained greatest ever attention in the perspective of growing population and diminishing fo...

  18. Long-Term Symbolic Learning

    National Research Council Canada - National Science Library

    Kennedy, William G; Trafton, J. G

    2007-01-01

    What are the characteristics of long-term learning? We investigated the characteristics of long-term, symbolic learning using the Soar and ACT-R cognitive architectures running cognitive models of two simple tasks...

  19. Long-term plutonium storage: Design concepts

    International Nuclear Information System (INIS)

    Wilkey, D.D.; Wood, W.T.; Guenther, C.D.

    1994-01-01

    An important part of the Department of Energy (DOE) Weapons Complex Reconfiguration (WCR) Program is the development of facilities for long-term storage of plutonium. The WCR design goals are to provide storage for metals, oxides, pits, and fuel-grade plutonium, including material being held as part of the Strategic Reserve and excess material. Major activities associated with plutonium storage are sorting the plutonium inventory, material handling and storage support, shipping and receiving, and surveillance of material in storage for both safety evaluations and safeguards and security. A variety of methods for plutonium storage have been used, both within the DOE weapons complex and by external organizations. This paper discusses the advantages and disadvantages of proposed storage concepts based upon functional criteria. The concepts discussed include floor wells, vertical and horizontal sleeves, warehouse storage on vertical racks, and modular storage units. Issues/factors considered in determining a preferred design include operational efficiency, maintenance and repair, environmental impact, radiation and criticality safety, safeguards and security, heat removal, waste minimization, international inspection requirements, and construction and operational costs

  20. The epidemiology of long- and short-term cancer survivors

    DEFF Research Database (Denmark)

    Jarlbæk, Lene; Christensen, Linda; Bruera, Eduardo

    2014-01-01

    Introduction. In this study, we present data from a population-based cohort of incident cancer patients separated in long- and short-term survivors. Our aim was to procure denominators for use in the planning of rehabilitation and palliative care programs. Material and methods. A registry......-linkage cohort study. All cancer patients, diagnosed from 1993 to 2003 from a 470 000 large population, were followed individually from diagnosis to death or until 31 December 2008. Long-term survivors lived five years or more after the time of the cancer diagnosis (TOCD). Short-term survivors died less than...... and sex. Two-year crude cancer survival seems as a clinically relevant cut point for characterizing potential "denominators" for rehabilitation or palliative care programs. From this cohort of incident cancer patients, and using two-year survival as a cut point, it could be estimated that 54% would...

  1. Pediatric polytrauma : Short-term and long-term outcomes

    NARCIS (Netherlands)

    vanderSluis, CK; Kingma, J; Eisma, WH; tenDuis, HJ

    Objective: To assess the short-term and long-term outcomes of pediatric polytrauma patients and to analyze the extent to which short-term outcomes can predict long-term outcomes. Materials and Methods: Ail pediatric polytrauma patients (Injury Severity Score of greater than or equal to 16, less than

  2. Wildfire Mitigation and Private Lands: Managing Long-Term Vulnerabilities

    Science.gov (United States)

    Brian Muller; Stacey Schulte

    2006-01-01

    Long-term management of wildfire vulnerability requires strategies that address complex interactions between fire ecology and human settlement. In this paper, we examine the integration of wildfire mitigation and land use planning in county governments in the western U.S. This research relies on data from two sources. First, we conducted a survey of land use...

  3. Radiation?induced mesothelioma among long?term solid cancer survivors: a longitudinal analysis of SEER database

    OpenAIRE

    Farioli, Andrea; Ottone, Marta; Morganti, Alessio G.; Compagnone, Gaetano; Romani, Fabrizio; Cammelli, Silvia; Mattioli, Stefano; Violante, Francesco S.

    2016-01-01

    Abstract We investigated the association between external beam radiotherapy (EBRT) and pleural and peritoneal mesothelioma among long?term (>5?years) solid cancer survivors. We analyzed data from the US Surveillance, Epidemiology, and End Results (SEER) program (1973?2012). We fitted survival models adjusted by age, gender, race, year, surgery, and relative risk of primary mesothelioma in the county of residence (proxy for individual asbestos exposure). We estimated hazard ratios [HR] with re...

  4. Planning ahead : although Canada could experience a shortage of some 300,000 workers within the next 20 years, long-term strategies can help companies cope : part 2

    Energy Technology Data Exchange (ETDEWEB)

    Cook, D.

    2007-01-15

    This article is the second in a 2-part series examining the impacts of the labour shortage in the energy industry. Most oil and gas companies are implementing long-term strategies in order to deal with the anticipated labour crisis. Labour, material, services and other factors are taken into consideration when developing business plans, and industry will adjust projects accordingly to accommodate labour constraints and uneconomic cost environments. Companies are collecting and analyzing data in order to define strategies to address retirement and longer-term workforce planning issues. EnCana is supporting a heavy equipment operator training program jointly with the government of British Columbia to help recruit aboriginal communities. EnCana is also recognizing the value of new immigrant professionals and has identified the group as an emerging recruitment talent pool. Shell Canada's long term plans for recruiting experienced staff include dedicating significant resources to a campus recruitment campaign, and connecting with Royal Dutch Shell to extend their recruitment reach. Shell Canada is also strengthening its on-boarding program for both new permanent full-time and part-time employees. The company recently announced its largest single community investment in the Northern Alberta Institute of Technology's Building on Demand campaign. The $3 million will be used to create the Shell Manufacturing Centre, as well as to provide bursaries for students pursuing apprenticeships and technical training. Petro-Canada's long-term recruitment strategy includes continually identifying and bringing in talented employees to meet the company's business goals. Devon Canada is also focusing on career path development and has established significant budgets for training and professional development. It was concluded that employers in the oil and gas industry must develop effective recruitment strategies to attract and retain critical talent for the short and

  5. Causes of death in long-term survivors of head and neck cancer.

    Science.gov (United States)

    Baxi, Shrujal S; Pinheiro, Laura C; Patil, Sujata M; Pfister, David G; Oeffinger, Kevin C; Elkin, Elena B

    2014-05-15

    Survivors of head and neck squamous cell carcinoma (HNSCC) face excess mortality from multiple causes. We used the population-based Surveillance, Epidemiology, and End Results (SEER) cancer registry data to evaluate the causes of death in patients with nonmetastatic HNSCC diagnosed between 1992 and 2005 who survived at least 3 years from diagnosis (long-term survivors). We used competing-risks proportional hazards regression to estimate probabilities of death from causes: HNSCC, second primary malignancy (SPM) excluding HNSCC, cardiovascular disease, and other causes. We identified 35,958 three-year survivors of HNSCC with a median age at diagnosis of 60 years (range = 18-100 years) and a median follow-up of 7.7 years (range = 3-18 years). There were 13,120 deaths during the study period. Death from any cause at 5 and 10 years was 15.4% (95% confidence interval [CI] = 15.0%-15.8%) and 41.0% (95% CI = 40.4%-41.6%), respectively. There were 3852 HNSCC deaths including both primary and subsequent head and neck tumors. The risk of death from HNSCC was greater in patients with nasopharynx or hypopharynx cancer and in patients with locally advanced disease. SPM was the leading cause of non-HNSCC death, and the most common sites of SPM death were lung (53%), esophagus (10%), and colorectal (5%) cancer. Many long-term HNSCC survivors die from cancers other than HNSCC and from noncancer causes. Routine follow-up care for HNSCC survivors should expand beyond surveillance for recurrent and new head and neck cancers. © 2014 American Cancer Society.

  6. Pad A treatability study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-06-01

    This plan addresses the work to be accomplished by the Pad A Treatability Study Project. The purpose of this project is to investigate potential treatment and separation technologies, identify the best technologies, and to demonstrate by both lab- and pilot-scale demonstration, the most applicable remedial technologies for treating plutonium-contaminated salts at the Pad A site located at the Subsurface Disposal Area (SDA) at the Radioactive Waste Management Complex (RWMC) a the Idaho National Engineering Laboratory (INEL). The conduct of this project will be supported by other DOE laboratories, universities, and private industries, who will provide support for near-term demonstrations of treatment and separation technologies. The purpose of this long-range planning document is to present the detailed plan for the implementation of the Pad A Treatability Study Project

  7. Post-term surveillance and birth outcomes in South Asian-born compared with Australian-born women.

    Science.gov (United States)

    Yim, C; Wong, L; Cabalag, C; Wallace, E M; Davies-Tuck, M

    2017-02-01

    To determine if apparently healthy post-term South Asian-born (SA) women were more likely to have abnormal post-term fetal surveillance than Australian- and New Zealand-born (AUS/NZ) women, whether those abnormalities were associated with increased rates of obstetric intervention and adverse perinatal outcomes, and whether SA women and their babies were at higher risk of adverse outcomes in the post-term period irrespective of their post-term surveillance outcomes. Post-term surveillance and perinatal outcomes of 145 SA and 272 AUS/NZ nulliparous women with a singleton post-term pregnancy were compared in a retrospective multicentre cohort analysis. Post-term SA women were not significantly more likely to have a low amniotic fluid index (AFI) than AUS/NZ women. However, they were nearly four times more likely (odds ratio 3.75; 95% CI 1.49-9.44) to have an abnormal CTG (P=0.005). Irrespective of maternal region of birth having an abnormal cardiotocography (CTG) or AFI was not associated with adverse intrapartum or perinatal outcomes. However, post-term SA women were significantly more likely than AUS/NZ women to have intrapartum fetal compromise (P=0.03) and an intrapartum cesarean section (P=0.002). Babies of SA women were more also significantly likely to be admitted to the Special Care Nursery or Neonatal Intensive Care Unit (P=0.02). Post-term SA women experience higher rates of fetal compromise (antenatal and intrapartum) and obstetric intervention than AUS/NZ women. Irrespective of maternal region of birth an abnormal CTG or AFI was not predictive of adverse outcomes.

  8. Assessing qualitative long-term volcanic hazards at Lanzarote Island (Canary Islands)

    Science.gov (United States)

    Becerril, Laura; Martí, Joan; Bartolini, Stefania; Geyer, Adelina

    2017-07-01

    Conducting long-term hazard assessment in active volcanic areas is of primary importance for land-use planning and defining emergency plans able to be applied in case of a crisis. A definition of scenario hazard maps helps to mitigate the consequences of future eruptions by anticipating the events that may occur. Lanzarote is an active volcanic island that has hosted the largest (> 1.5 km3 DRE) and longest (6 years) eruption, the Timanfaya eruption (1730-1736), on the Canary Islands in historical times (last 600 years). This eruption brought severe economic losses and forced local people to migrate. In spite of all these facts, no comprehensive hazard assessment or hazard maps have been developed for the island. In this work, we present an integrated long-term volcanic hazard evaluation using a systematic methodology that includes spatial analysis and simulations of the most probable eruptive scenarios.

  9. Environmental health surveillance system; Kankyo hoken surveillance system

    Energy Technology Data Exchange (ETDEWEB)

    Ono, M. [National Inst. for Environmental Studies, Tsukuba (Japan)

    1998-02-01

    The Central Environmental Pollution Prevention Council pointed out the necessity to establish an environmental health surveillance system (hereinafter referred to as System) in its report `on the first type district specified by the Environmental Pollution Caused Health Damages Compensation Act,` issued in 1986. A study team, established in Environment Agency, has been discussing to establish System since 1986. This paper outlines System, and some of the pilot surveillance results. It is not aimed at elucidation of the cause-effect relationships between health and air pollution but at discovery of problems, in which the above relationships in a district population are monitored periodically and continuously from long-term and prospective viewpoints, in order to help take necessary measures in the early stage. System is now collecting the data of the chronic obstructive lung diseases on a nation-wide scale through health examinations of 3-year-old and preschool children and daily air pollution monitoring. 6 refs., 3 figs., 1 tab.

  10. Long Term Financing of Infrastructure

    OpenAIRE

    Sinha, Sidharth

    2014-01-01

    Infrastructure projects, given their long life, require long term financing. The main sources of long term financings are insurance and pension funds who seek long term investments with low credit risk. However, in India household financial savings are mainly invested in bank deposits. Insurance and pension funds account for only a small percentage of household financial savings. In addition most infrastructure projects do not qualify for investment by insurance and pension funds because of t...

  11. Should cities hosting mass gatherings invest in public health surveillance and planning? Reflections from a decade of mass gatherings in Sydney, Australia.

    Science.gov (United States)

    Thackway, Sarah; Churches, Timothy; Fizzell, Jan; Muscatello, David; Armstrong, Paul

    2009-09-08

    Mass gatherings have been defined by the World Health Organisation as "events attended by a sufficient number of people to strain the planning and response resources of a community, state or nation". This paper explores the public health response to mass gatherings in Sydney, the factors that influenced the extent of deployment of resources and the utility of planning for mass gatherings as a preparedness exercise for other health emergencies. Not all mass gatherings of people require enhanced surveillance and additional response. The main drivers of extensive public health planning for mass gatherings reflect geographical spread, number of international visitors, event duration and political and religious considerations. In these instances, the implementation of a formal risk assessment prior to the event with ongoing daily review is important in identifying public health hazards.Developing and utilising event-specific surveillance to provide early-warning systems that address the specific risks identified through the risk assessment process are essential. The extent to which additional resources are required will vary and depend on the current level of surveillance infrastructure.Planning the public health response is the third step in preparing for mass gatherings. If the existing public health workforce has been regularly trained in emergency response procedures then far less effort and resources will be needed to prepare for each mass gathering event. The use of formal emergency management structures and co-location of surveillance and planning operational teams during events facilitates timely communication and action. One-off mass gathering events can provide a catalyst for innovation and engagement and result in opportunities for ongoing public health planning, training and surveillance enhancements that outlasted each event.

  12. Should cities hosting mass gatherings invest in public health surveillance and planning? Reflections from a decade of mass gatherings in Sydney, Australia

    Directory of Open Access Journals (Sweden)

    Muscatello David

    2009-09-01

    Full Text Available Abstract Background Mass gatherings have been defined by the World Health Organisation as "events attended by a sufficient number of people to strain the planning and response resources of a community, state or nation". This paper explores the public health response to mass gatherings in Sydney, the factors that influenced the extent of deployment of resources and the utility of planning for mass gatherings as a preparedness exercise for other health emergencies. Discussion Not all mass gatherings of people require enhanced surveillance and additional response. The main drivers of extensive public health planning for mass gatherings reflect geographical spread, number of international visitors, event duration and political and religious considerations. In these instances, the implementation of a formal risk assessment prior to the event with ongoing daily review is important in identifying public health hazards. Developing and utilising event-specific surveillance to provide early-warning systems that address the specific risks identified through the risk assessment process are essential. The extent to which additional resources are required will vary and depend on the current level of surveillance infrastructure. Planning the public health response is the third step in preparing for mass gatherings. If the existing public health workforce has been regularly trained in emergency response procedures then far less effort and resources will be needed to prepare for each mass gathering event. The use of formal emergency management structures and co-location of surveillance and planning operational teams during events facilitates timely communication and action. Summary One-off mass gathering events can provide a catalyst for innovation and engagement and result in opportunities for ongoing public health planning, training and surveillance enhancements that outlasted each event.

  13. Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin, Rev. No.: 1

    Energy Technology Data Exchange (ETDEWEB)

    Echelard, Tim

    2006-09-01

    Three underground nuclear tests were conducted on Amchitka Island, Alaska, in 1965, 1969, and 1971. The effects of the Long Shot, Milrow, and Cannikin tests on the environment were extensively investigated during and following the detonations, and the area continues to be monitored today. This report is intended to document the basis for the Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin (hereafter referred to as ''Amchitka Site'') subsurface completion recommendation of No Further Remedial Action Planned with Long-Term Surveillance and Maintenance, and define the long-term surveillance and maintenance strategy for the subsurface. A number of factors were considered in evaluating and selecting this recommendation for the Amchitka Site. Historical studies and monitoring data, ongoing monitoring data, the results of groundwater modeling, and the results of an independent stakeholder-guided scientific investigation were also considered in deciding the completion action. Water sampling during and following the testing showed no indication that radionuclides were released to the near surface, or marine environment with the exception of tritium, krypton-85, and iodine-131 found in the immediate vicinity of Long Shot surface ground zero. One year after Long Shot, only tritium was detectable (Merritt and Fuller, 1977). These tritium levels, which were routinely monitored and have continued to decline since the test, are above background levels but well below the current safe drinking water standard. There are currently no feasible means to contain or remove radionuclides in or around the test cavities beneath the sites. Surface remediation was conducted in 2001. Eleven drilling mud pits associated with the Long Shot, Milrow and Cannikin sites were remediated. Ten pits were remediated by stabilizing the contaminants and constructing an impermeable cap over each pit. One pit was remediated by removing all of the contaminated mud

  14. Institutional Care for Long-Term Mechanical Ventilation in Canada: A National Survey

    Directory of Open Access Journals (Sweden)

    Louise Rose

    2014-01-01

    Full Text Available INTRODUCTION: No national Canadian data define resource requirements and care delivery for ventilator-assisted individuals (VAIs requiring long-term institutional care. Such data will assist in planning health care services to this population.

  15. Long-Term Implications of the Fiscal Year 2009 Future Years Defense Program

    National Research Council Canada - National Science Library

    Talaber, Adam; Arthur, David; Bass, Elizabeth; Bennett, Michael; Eveker, Kevin; Frisk, Daniel; Labs, Eric J; Lussier, Frances; Percy, Allison; Hall, Raymond; Newman, David; Regan, Dawn S; Schmit, Matthew; Wheelock, Jason; Kelley, Kate

    2009-01-01

    ...) has published a series of reports about its projections of the resources that might be needed over the long term to carry out the Bush Administration's plans as expressed in the Future Years Defense Program (FYDP...

  16. Evaluation of the long-term program plans of the US Division of Controlled Thermonuclear Research. Progress report No. 1

    International Nuclear Information System (INIS)

    Nichols, S.P.; Vanston, J.H. Jr.

    As part of the Partitive Analytical Forecasting (PAF) technique, the Graphical Evaluation and Review Technique (GERTS) IIIZ computer code is used to perform simulations on a logic network describing the DCTR long-term program plan. Logic networks describing the tokamak, mirror, and theta-pinch developments are simulated individually and then together to form an overall DCTR program network. The results of the simulation of the overall network using various funding schemes and strategies are presented. An economic sensitivity analysis is provided for the tokamak logic networks. An analysis is also performed of the fusion-fission hybrid concept in the context of the present DCTR goals

  17. Long term stability of power systems

    Energy Technology Data Exchange (ETDEWEB)

    Kundur, P; Gao, B [Powertech Labs. Inc., Surrey, BC (Canada)

    1994-12-31

    Power system long term stability is still a developing subject. In this paper we provide our perspectives and experiences related to long term stability. The paper begins with the description of the nature of the long term stability problem, followed by the discussion of issues related to the modeling and solution techniques of tools for long term stability analysis. Cases studies are presented to illustrate the voltage stability aspect and plant dynamics aspect of long term stability. (author) 20 refs., 11 figs.

  18. The experiences of people with dementia and intellectual disabilities with surveillance technologies in residential care

    NARCIS (Netherlands)

    Niemeijer, A.R.; Depla, M.F.I.A.; Frederiks, B.J.M.; Hertogh, C.M.P.M.

    2015-01-01

    Background: Surveillance technology such as tag and tracking systems and video surveillance could increase the freedom of movement and consequently autonomy of clients in long-term residential care settings, but is also perceived as an intrusion on autonomy including privacy. Objective: To explore

  19. Path planning for persistent surveillance applications using fixed-wing unmanned aerial vehicles

    Science.gov (United States)

    Keller, James F.

    This thesis addresses coordinated path planning for fixed-wing Unmanned Aerial Vehicles (UAVs) engaged in persistent surveillance missions. While uniquely suited to this mission, fixed wing vehicles have maneuver constraints that can limit their performance in this role. Current technology vehicles are capable of long duration flight with a minimal acoustic footprint while carrying an array of cameras and sensors. Both military tactical and civilian safety applications can benefit from this technology. We make three main contributions: C1 A sequential path planner that generates a C 2 flight plan to persistently acquire a covering set of data over a user designated area of interest. The planner features the following innovations: • A path length abstraction that embeds kino-dynamic motion constraints to estimate feasible path length. • A Traveling Salesman-type planner to generate a covering set route based on the path length abstraction. • A smooth path generator that provides C 2 routes that satisfy user specified curvature constraints. C2 A set of algorithms to coordinate multiple UAVs, including mission commencement from arbitrary locations to the start of a coordinated mission and de-confliction of paths to avoid collisions with other vehicles and fixed obstacles. C3 A numerically robust toolbox of spline-based algorithms tailored for vehicle routing validated through flight test experiments on multiple platforms. A variety of tests and platforms are discussed. The algorithms presented are based on a technical approach with approximately equal emphasis on analysis, computation, dynamic simulation, and flight test experimentation. Our planner (C1) directly takes into account vehicle maneuverability and agility constraints that could otherwise render simple solutions infeasible. This is especially important when surveillance objectives elevate the importance of optimized paths. Researchers have developed a diverse range of solutions for persistent

  20. Long-term research plan for human factors affecting safeguards at nuclear power plants. Volume 1. Summary and users' guide. Vol. 1

    International Nuclear Information System (INIS)

    O'Brien, J.N.; Fainberg, A.

    1984-04-01

    This report presents a long-term research plan for addressing human factors which can adversely affect safeguards at nuclear power plants. It was developed in order to prioritize and propose research for NRC in regulating power plant safeguards. Research efforts addressing human factors in safeguards were developed and prioritized according to the importance of human factors areas. Research was also grouped to take advantage of common research approaches and data sources where appropriate. Four main program elements emerged from the analysis, namely (1) Training and Performance Evaluation, (2) Organizational Factors, (3) Man-Machine Interface, and (4) Trustworthiness and Reliability. Within each program element, projects are proposed with results and information flowing between program elements where useful. An overall research plan was developed for a 4-year period and it would lead ultimately to regulatory activities including rulemaking, regulatory guides, and technical bases for regulatory action. The entire plan is summarized in Volume 1 of this report

  1. Occupational health surveillance: a means to identify work-related risks.

    Science.gov (United States)

    Froines, J R; Dellenbaugh, C A; Wegman, D H

    1986-09-01

    The lack of successful disease surveillance methods has resulted in few reliable estimates of workplace-related disease. Hazard surveillance--the ongoing assessment of chemical use and worker exposure to the chemicals--is presented as a way to supplement occupational disease surveillance. Existing OSHA (Occupational Safety and Health Administration) and NIOSH (National Institute for Occupational Health) data systems are adapted to this function to characterize the distribution and type of hazardous industry in Los Angeles County. A new method is developed for ranking potentially hazardous industries in the county using actual exposure measurements from federal OSHA compliance inspections. The strengths of the different systems are presented along with considerations of industrial employment and types of specific chemical exposures. Applications for information from hazard surveillance are discussed in terms of intervention, monitoring exposure control, planning, research, and as a complement to disease surveillance.

  2. Sensor-Oriented Path Planning for Multiregion Surveillance with a Single Lightweight UAV SAR

    Science.gov (United States)

    Li, Jincheng; Chen, Jie; Wang, Pengbo; Li, Chunsheng

    2018-01-01

    In the surveillance of interested regions by unmanned aerial vehicle (UAV), system performance relies greatly on the motion control strategy of the UAV and the operation characteristics of the onboard sensors. This paper investigates the 2D path planning problem for the lightweight UAV synthetic aperture radar (SAR) system in an environment of multiple regions of interest (ROIs), the sizes of which are comparable to the radar swath width. Taking into account the special requirements of the SAR system on the motion of the platform, we model path planning for UAV SAR as a constrained multiobjective optimization problem (MOP). Based on the fact that the UAV route can be designed in the map image, an image-based path planner is proposed in this paper. First, the neighboring ROIs are merged by the morphological operation. Then, the parts of routes for data collection of the ROIs can be located according to the geometric features of the ROIs and the observation geometry of UAV SAR. Lastly, the route segments for ROIs surveillance are connected by a path planning algorithm named the sampling-based sparse A* search (SSAS) algorithm. Simulation experiments in real scenarios demonstrate that the proposed sensor-oriented path planner can improve the reconnaissance performance of lightweight UAV SAR greatly compared with the conventional zigzag path planner. PMID:29439447

  3. Sensor-Oriented Path Planning for Multiregion Surveillance with a Single Lightweight UAV SAR.

    Science.gov (United States)

    Li, Jincheng; Chen, Jie; Wang, Pengbo; Li, Chunsheng

    2018-02-11

    In the surveillance of interested regions by unmanned aerial vehicle (UAV), system performance relies greatly on the motion control strategy of the UAV and the operation characteristics of the onboard sensors. This paper investigates the 2D path planning problem for the lightweight UAV synthetic aperture radar (SAR) system in an environment of multiple regions of interest (ROIs), the sizes of which are comparable to the radar swath width. Taking into account the special requirements of the SAR system on the motion of the platform, we model path planning for UAV SAR as a constrained multiobjective optimization problem (MOP). Based on the fact that the UAV route can be designed in the map image, an image-based path planner is proposed in this paper. First, the neighboring ROIs are merged by the morphological operation. Then, the parts of routes for data collection of the ROIs can be located according to the geometric features of the ROIs and the observation geometry of UAV SAR. Lastly, the route segments for ROIs surveillance are connected by a path planning algorithm named the sampling-based sparse A* search (SSAS) algorithm. Simulation experiments in real scenarios demonstrate that the proposed sensor-oriented path planner can improve the reconnaissance performance of lightweight UAV SAR greatly compared with the conventional zigzag path planner.

  4. Alterations in synaptic curvature in the dentate gyrus following induction of long-term potentiation, long-term depression, and treatment with the N-methyl-D-aspartate receptor antagonist CPP

    Czech Academy of Sciences Publication Activity Database

    Medvedev, N. I.; Popov, V. I.; Dallerac, G.; Davies, H.A.; Laroche, S.; Kraev, I. V.; Rodríguez Arellano, Jose Julio; Doyere, V.; Stewart, M.G.

    2010-01-01

    Roč. 171, č. 2 (2010), s. 390-397 ISSN 0306-4522 Institutional research plan: CEZ:AV0Z50390703 Keywords : D synaptic ultrastructure * hippocampus * long term potentiation and depression Subject RIV: FH - Neurology Impact factor: 3.215, year: 2010

  5. Long-term athletic development- part 1: a pathway for all youth.

    Science.gov (United States)

    Lloyd, Rhodri S; Oliver, Jon L; Faigenbaum, Avery D; Howard, Rick; De Ste Croix, Mark B A; Williams, Craig A; Best, Thomas M; Alvar, Brent A; Micheli, Lyle J; Thomas, D Phillip; Hatfield, Disa L; Cronin, John B; Myer, Gregory D

    2015-05-01

    The concept of developing talent and athleticism in youth is the goal of many coaches and sports systems. Consequently, an increasing number of sporting organizations have adopted long-term athletic development models in an attempt to provide a structured approach to the training of youth. It is clear that maximizing sporting talent is an important goal of long-term athletic development models. However, ensuring that youth of all ages and abilities are provided with a strategic plan for the development of their health and physical fitness is also important to maximize physical activity participation rates, reduce the risk of sport- and activity-related injury, and to ensure long-term health and well-being. Critical reviews of independent models of long-term athletic development are already present within the literature; however, to the best of our knowledge, a comprehensive examination and review of the most prominent models does not exist. Additionally, considerations of modern day issues that may impact on the success of any long-term athletic development model are lacking, as are proposed solutions to address such issues. Therefore, within this 2-part commentary, Part 1 provides a critical review of existing models of practice for long-term athletic development and introduces a composite youth development model that includes the integration of talent, psychosocial and physical development across maturation. Part 2 identifies limiting factors that may restrict the success of such models and offers potential solutions.

  6. Window of Opportunity for New Disease Surveillance: Developing Keyword Lists for Monitoring Mental Health and Injury Through Syndromic Surveillance.

    Science.gov (United States)

    Lauper, Ursula; Chen, Jian-Hua; Lin, Shao

    2017-04-01

    Studies have documented the impact that hurricanes have on mental health and injury rates before, during, and after the event. Since timely tracking of these disease patterns is crucial to disaster planning, response, and recovery, syndromic surveillance keyword filters were developed by the New York State Department of Health to study the short- and long-term impacts of Hurricane Sandy. Emergency department syndromic surveillance is recognized as a valuable tool for informing public health activities during and immediately following a disaster. Data typically consist of daily visit reports from hospital emergency departments (EDs) of basic patient data and free-text chief complaints. To develop keyword lists, comparisons were made with existing CDC categories and then integrated with lists from the New York City and New Jersey health departments in a collaborative effort. Two comprehensive lists were developed, each containing multiple subcategories and over 100 keywords for both mental health and injury. The data classifiers using these keywords were used to assess impacts of Sandy on mental health and injuries in New York State. The lists will be validated by comparing the ED chief complaint keyword with the final ICD diagnosis code. (Disaster Med Public Health Preparedness. 2017;11:173-178).

  7. Long term ground movement of TRISTAN synchrotron

    International Nuclear Information System (INIS)

    Endo, K.; Ohsawa, Y.; Miyahara, M.

    1989-01-01

    The long term ground movement is estimated through the geological survey before a big accelerator is planned. For the case of TRISTAN-MR (main ring), its site was surveyed to reflect the underground information to the building prior to the construction. The movement of the synchrotron magnet mainly results from the structure of the tunnel. If an individual movement of the magnet exceeds a certain threshold limit, it gives a significant effect on the particle behavior in a synchrotron. Height of the quadrupole magnets were observed periodically during past two years at the TRISTAN-MR and their height differences along the 3 km circumference of the accelerator ring were decomposed into the Fourier components depicting the causes of the movements. Results shows the movement of the tunnel foundation which was also observed by the simultaneous measurement of both magnets and fiducial marks on the tunnel wall. The long term movement of the magnets is summarized with the geological survey prior to construction. 1 ref., 6 figs., 1 tab

  8. Safety issues in construction of facilities for long-term storage of radioactive waste at vector site

    Energy Technology Data Exchange (ETDEWEB)

    Tokarevskyi, O.; Alekseeva, Z.; Kondratiev, S. [State Scientific and Technical Center for Nuclear and Radiation Safety, Kyiv (Ukraine); Rybalka, N. [State Nuclear Regulatory Inspectorate of Ukraine, Kyiv (Ukraine)

    2013-07-01

    In Ukraine, it is planned to create a number of near-surface facilities for disposal of short-lived RW and long-term (up to 100 years) storage of long-lived RW at the Vector site in the Chernobyl exclusion zone. The expected streams of long-lived RW are analyzed in the paper. According to the analysis of RW streams, in particular, issues are considered on development of RW acceptance criteria, admissible radiological impacts during preparation of RW for long-term storage, reliability of barriers (RW packages, modules and structures, etc.) during long-term storage of RW. (orig.)

  9. Current Management Strategy for Active Surveillance in Prostate Cancer.

    Science.gov (United States)

    Syed, Jamil S; Javier-Desloges, Juan; Tatzel, Stephanie; Bhagat, Ansh; Nguyen, Kevin A; Hwang, Kevin; Kim, Sarah; Sprenkle, Preston C

    2017-02-01

    Active surveillance has been increasingly utilized as a strategy for the management of favorable-risk, localized prostate cancer. In this review, we describe contemporary management strategies of active surveillance, with a focus on traditional stratification schemes, new prognostic tools, and patient outcomes. Patient selection, follow-up strategy, and indication for delayed intervention for active surveillance remain centered around PSA, digital rectal exam, and biopsy findings. Novel tools which include imaging, biomarkers, and genetic assays have been investigated as potential prognostic adjuncts; however, their role in active surveillance remains institutionally dependent. Although 30-50% of patients on active surveillance ultimately undergo delayed treatment, the vast majority will remain free of metastasis with a low risk of dying from prostate cancer. The optimal method for patient selection into active surveillance is unknown; however, cancer-specific mortality rates remain excellent. New prognostication tools are promising, and long-term prospective, randomized data regarding their use in active surveillance will be beneficial.

  10. Long-term climate monitoring by the global climate observing system

    International Nuclear Information System (INIS)

    Karl, T.R.

    1995-12-01

    Is the climate warming? Is the hydrologic cycle changing? Is the atmospheric/oceanic circulation changing? Is the climate becoming more variable or extreme? Is radiative forcing of the climate changing? are complex questions not only from the standpoint of a multi-variate problem, but because of the various aspects of spatial and temporal sampling that must be considered on a global scale. The development of a Global Climate Observing System (GCOS) offers the opportunity for scientists to do something about existing observing deficiencies in light of the importance of documenting long-term climate changes that may already be affected by anthropogenic changes of atmospheric composition and land use as well as other naturally occurring changes. As an important step toward improving the present inadequacies, a workshop was held to help define the long-term monitoring requirements minimally needed to address the five questions posed above, with special emphasis on detecting anthropogenic climate change and its potential impact on managed and unmanaged systems The workshop focussed on three broad areas related to long-term climate monitoring: (a) the scientific rationale for the long-term climate products (including their accuracy, resolution, and homogeneity) required from our observing systems as related to climate monitoring and climate change detection and attribution; (b) the status of long-term climate products and the observing systems from which these data are derived; and (c) implementation strategies necessary to fulfill item (a) in light of existing systems. Item (c) was treated more in terms of feasibility rather than as a specific implementation plan. figs., tabs., refs

  11. Assessing qualitative long-term volcanic hazards at Lanzarote Island (Canary Islands

    Directory of Open Access Journals (Sweden)

    L. Becerril

    2017-07-01

    Full Text Available Conducting long-term hazard assessment in active volcanic areas is of primary importance for land-use planning and defining emergency plans able to be applied in case of a crisis. A definition of scenario hazard maps helps to mitigate the consequences of future eruptions by anticipating the events that may occur. Lanzarote is an active volcanic island that has hosted the largest (>  1.5 km3 DRE and longest (6 years eruption, the Timanfaya eruption (1730–1736, on the Canary Islands in historical times (last 600 years. This eruption brought severe economic losses and forced local people to migrate. In spite of all these facts, no comprehensive hazard assessment or hazard maps have been developed for the island. In this work, we present an integrated long-term volcanic hazard evaluation using a systematic methodology that includes spatial analysis and simulations of the most probable eruptive scenarios.

  12. Flexible endoscopy for pediatric tracheobronchial metallic stent placement, maintenance and long-term outcomes

    Science.gov (United States)

    2018-01-01

    Objectives To assess the placement, surveillance management and long-term outcomes of the tracheobronchial (TB) balloon expandable metallic stent (BEMS) managed by therapeutic flexible endoscopy (TFE). Methods This is a retrospective review and analysis of all computerized medical records and related flexible endoscopy videos of pediatric patients who received TB BEMS during 20 years period, from January 1997 to December 2016. TFE techniques with forceps debridement, balloon dilatation and laser ablation were used to implant stents, perform regular surveillance, maintain their functions, and expand the diameters of BEMS. Short-length (30cm-36cm) endoscopes of OD 3.2mm to 5.0mm coupled with the noninvasive ventilation, without ventilation bag, mask or airway tube, supported the whole procedures. Results 146 BEMS were implanted in 87 consecutive children, including 84 tracheal, 15 carinal and 47 bronchial stents. At the time of placement, the mean age was 35.6 ± 54.6 month-old (range 0.3–228) and the mean body weight was 13.9 ± 10.6 kg (range 2.2–60). Surveillance period was 9.4 ± 6.7 years (range, 0.3–18.0). Satisfactory clinical improvements were noted immediately in all but two patients. Seventy-two (82.8%) patients were still alive with stable respiratory status, except two patients necessitating TFE management every two months. Fifty-one stents, including 35 tracheal and 16 bronchial ones, were successfully retrieved mainly with rigid endoscopy. Implanted stents could be significantly (stent diameters were positively correlated to the implanted duration. Altogether, 33 stents expired (15 patients), 51 were retrieved (40 patients), and 62 remained and functioning well (38 patients), with their mean duration of 7.4 ± 9.5, 34.9 ± 36.3 and 82.3 ± 62.5 months, respectively. Conclusion In pediatric patients, TFE with short-length scopes coupled with this NIV support has provided a safe, feasible and effective modality in placing and subsequently managing

  13. Using an engaging approach to products to help create long-term credibility

    International Nuclear Information System (INIS)

    McNeill, G.; Larkin, E.

    1993-01-01

    A long-term, thorough and engaging public information products plan is essential for supporting interaction between Nevadans and the scientists and staff of the US DOE Yucca Mountain Site Characterization Project (YMP). As members of the Institutional and External Affairs office on the YMP in Nevada, our focus is to create successful products for a Nevada audience, in accordance with DOE regulations. Our product plan is broad, but has the same theoretical foundation whether we are developing a new fact sheet of working with a scientist to help him or her communicate effectively. Our goals are to: Create products that help build long-term credibility; communicate honestly about risk; engage the public in meaningful, effective ways; be receptive to hearing Nevadans' concerns and questions; respond in ways that indicate that the public has been heard and respected; and to keep away from the open-quotes usclose quotes versus open-quotes themclose quotes orientation, distinguishing our communication approach from others. Explanations of our rationale, products plan, and goals and techniques for achieving them are stated, and related problems are described

  14. Safety of Long-term Interim Storage Facilities - Workshop Proceedings

    International Nuclear Information System (INIS)

    2014-01-01

    The objective of this workshop was to discuss and review current national activities, plans and regulatory approaches for the safety of long term interim storage facilities dedicated to spent nuclear fuel (SF), high level waste (HLW) and other radioactive materials with prolonged storage regimes. It was also intended to discuss results of experiments and to identify necessary R and D to confirm safety of fuel and cask during the long-term storage. Safety authorities and their Technical Support Organisation (TSO), Fuel Cycle Facilities (FCF) operating organisations and international organisations were invited to share information on their approaches, practices and current developments. The workshop was organised in an opening session, three technical sessions, and a conclusion session. The technical sessions were focused on: - National approaches for long term interim storage facilities; - Safety requirements, regulatory framework and implementation issues; - Technical issues and operational experience, needs for R and D. Each session consisted of a number of presentations followed by a panel discussion moderated by the session Chairs. A summary of each session and subsequent discussion that ensued are provided as well as a summary of the results of the workshop with the text of the papers given and presentations made

  15. Improving an Integer Linear Programming Model of an Ecovat Buffer by Adding Long-Term Planning

    Directory of Open Access Journals (Sweden)

    Gijs J. H. de Goeijen

    2017-12-01

    Full Text Available The Ecovat is a seasonal thermal storage solution consisting of a large underground water tank divided into a number of virtual segments that can be individually charged and discharged. The goal of the Ecovat is to supply heat demand to a neighborhood throughout the entire year. In this work, we extend an integer linear programming model to describe the charging and discharging of such an Ecovat buffer by adding a long-term (yearly planning step to the model. We compare the results from the model using this extension to previously obtained results and show significant improvements when looking at the combination of costs and the energy content of the buffer at the end of the optimization. Furthermore, we show that the model is very robust against prediction errors. For this, we compare two different cases: one case in which we assume perfect predictions are available and one case in which we assume no predictions are available. The largest observed difference in costs between these two cases is less than 2%.

  16. Down the Road...Long Range Planning for Automation.

    Science.gov (United States)

    Texas State Library, Austin. Dept. of Library Development.

    The materials in this manual/workbook were prepared to assist participants in a workshop on long-range planning for library automation. Chapters cover the following topics: (1) "What Is Long-Range Planning?" (2) "Why Plan?" (3) "Who Needs to Participate?" (4) "Planning to Plan"; (5) "Determining Needs"; (6) "Description and Introduction"; (7)…

  17. A protocol improves GP recording of long-term sickness absence risk factors

    NARCIS (Netherlands)

    van Dijk, Paul C. M.; Hogervorst, Wouter; ter Riet, Gerben; van Dijk, Frank

    2008-01-01

    Background If general practitioners (GPs) were better informed about patients' risks of long-term sickness absence (LTSA), they could incorporate these risk assessments into their patient management plans and cooperate more with occupational physicians to prevent LTSA. Aim To evaluate the

  18. Implications of renewable energy technologies in the Bangladesh power sector. Long-term planning strategies

    Energy Technology Data Exchange (ETDEWEB)

    Mondal, Alam Hossain

    2010-10-04

    Bangladesh is facing daunting energy challenges: Security concerns over growing fuel imports, limited domestic energy resources for power generation, and projected demands for electricity that will exceed domestic supply capabilities within a few years. By acknowledging the potential of renewable energy resources, the country could possibly meet its unprecedented energy demand, thus increasing electricity accessibility for all and enhancing energy security through their advancement. The integration of renewable energy technologies in the power sector through national energy planning would, therefore, be a step in the right direction, not only for sustainable development of the country but also as part of Bangladesh's responsibility toward the global common task of environmental protection. This study estimates the potential of renewable energy sources for power generation in Bangladesh from the viewpoint of different promising available technologies. Future long-term electricity demand in Bangladesh is projected based on three economic growth scenarios. The energy planning model LEAP is applied to forecast the energy requirements from 2005 to 2035. Different policy scenarios, e.g., accelerated renewable energy production, null coal import, CO2 emission reduction targets and carbon taxes in the power sector from 2005 to 2035 are explored. The analyses are based on a long-term energy system model of Bangladesh using the MARKAL model. Prospects for the power sector development of the country are identified, which ensure energy security and mitigate environmental impacts. The technical potential of grid-connected solar photovoltaic and wind energy are estimated at 50174 MW and 4614 MW, respectively. The potential of energy from biomass and small hydro power plants is estimated at 566 MW and 125 MW, respectively. Total electricity consumption was 18 TWh in 2005 and is projected to increase about 7 times to 132 TWh by 2035 in the low GDP growth scenario. In the

  19. Long-term urethral catheterisation.

    Science.gov (United States)

    Turner, Bruce; Dickens, Nicola

    This article discusses long-term urethral catheterisation, focusing on the relevant anatomy and physiology, indications for the procedure, catheter selection and catheter care. It is important that nurses have a good working knowledge of long-term catheterisation as the need for this intervention will increase with the rise in chronic health conditions and the ageing population.

  20. Long-term performance of motor-operated valves

    Energy Technology Data Exchange (ETDEWEB)

    Scarbrough, T.G.

    1996-12-01

    The U.S. Nuclear Regulatory Commission (NRC) requires that motor-operated valves (MOVs) important to safety be designed, fabricated, erected, and tested to quality standards commensurate with the importance of the safety functions to be performed. Despite these requirements, operating experience and research revealed problems with the performance of MOVs in operating nuclear power plants. In response to the concerns about MOV performance, the NRC issued Generic Letter (GL) 89-10, {open_quotes}Safety-Related Motor-Operated Valve Testing and Surveillance,{close_quotes} and its supplements. Most licensees have completed the aspects of their GL 89-10 programs associated with the review of MOV design bases, verification of MOV switch settings initially, testing of MOVs under design-basis conditions where practicable, and improvement of evaluations of MOV failures and necessary corrective action. Licensees are establishing processes to ensure that the long-term aspects of their MOV programs, such as periodic verification of MOV capability and the trending of MOV problems, are maintained. The NRC staff is developing a generic letter to address periodic verification of MOV design-basis capability.

  1. Long-term performance of motor-operated valves

    International Nuclear Information System (INIS)

    Scarbrough, T.G.

    1996-01-01

    The U.S. Nuclear Regulatory Commission (NRC) requires that motor-operated valves (MOVs) important to safety be designed, fabricated, erected, and tested to quality standards commensurate with the importance of the safety functions to be performed. Despite these requirements, operating experience and research revealed problems with the performance of MOVs in operating nuclear power plants. In response to the concerns about MOV performance, the NRC issued Generic Letter (GL) 89-10, open-quotes Safety-Related Motor-Operated Valve Testing and Surveillance,close quotes and its supplements. Most licensees have completed the aspects of their GL 89-10 programs associated with the review of MOV design bases, verification of MOV switch settings initially, testing of MOVs under design-basis conditions where practicable, and improvement of evaluations of MOV failures and necessary corrective action. Licensees are establishing processes to ensure that the long-term aspects of their MOV programs, such as periodic verification of MOV capability and the trending of MOV problems, are maintained. The NRC staff is developing a generic letter to address periodic verification of MOV design-basis capability

  2. Expert consensus document: Mind the gaps—advancing research into short-term and long-term neuropsychological outcomes of youth sports-related concussions.

    Science.gov (United States)

    Carman, Aaron J; Ferguson, Rennie; Cantu, Robert; Comstock, R Dawn; Dacks, Penny A; DeKosky, Steven T; Gandy, Sam; Gilbert, James; Gilliland, Chad; Gioia, Gerard; Giza, Christopher; Greicius, Michael; Hainline, Brian; Hayes, Ronald L; Hendrix, James; Jordan, Barry; Kovach, James; Lane, Rachel F; Mannix, Rebekah; Murray, Thomas; Seifert, Tad; Shineman, Diana W; Warren, Eric; Wilde, Elisabeth; Willard, Huntington; Fillit, Howard M

    2015-04-01

    Sports-related concussions and repetitive subconcussive exposure are increasingly recognized as potential dangers to paediatric populations, but much remains unknown about the short-term and long-term consequences of these events, including potential cognitive impairment and risk of later-life dementia. This Expert Consensus Document is the result of a 1-day meeting convened by Safe Kids Worldwide, the Alzheimer's Drug Discovery Foundation, and the Andrews Institute for Orthopaedics and Sports Medicine. The goal is to highlight knowledge gaps and areas of critically needed research in the areas of concussion science, dementia, genetics, diagnostic and prognostic biomarkers, neuroimaging, sports injury surveillance, and information sharing. For each of these areas, we propose clear and achievable paths to improve the understanding, treatment and prevention of youth sports-related concussions.

  3. Long-term trends in foF2: A comparison of various methods

    Czech Academy of Sciences Publication Activity Database

    Laštovička, Jan; Mikhailov, A. V.; Ulich, T.; Bremer, J.; Elias, A. G.; Ortiz de Adler, N.; Jara, V.; Abarca del Rio, R.; Foppiano, A. J.; Ovalle, E.; Danilov, A. D.

    2006-01-01

    Roč. 68, č. 17 (2006), s. 1854-1870 ISSN 1364-6826 Institutional research plan: CEZ:AV0Z30420517 Keywords : Ionosphere * foF2 * Long-term trends * Anthropogenic effects Subject RIV: DG - Athmosphere Sciences, Meteorology Impact factor: 1.448, year: 2006

  4. Who is Surveilling Whom?

    DEFF Research Database (Denmark)

    Mortensen, Mette

    2014-01-01

    This article concerns the particular form of counter-surveillance termed “sousveillance”, which aims to turn surveillance at the institutions responsible for surveillance. Drawing on the theoretical perspectives “mediatization” and “aerial surveillance,” the article studies WikiLeaks’ publication...

  5. Safety Aspects of Long Term Spent Fuel Dry Storage

    International Nuclear Information System (INIS)

    Botsch, Wolfgang; Smalian, S.; Hinterding, P.; Drotleff, H.; Voelzke, H.; Wolff, D.; Kasparek, E.

    2014-01-01

    As a consequence of the lack of a final repository for spent nuclear fuel (SF) and high level waste (HLW), long term interim storage of SF and HLW will be necessary. As with the storage of all radioactive materials, the long term storage of SF and HLW must conform to safety requirements. Safety aspects such as safe enclosure of radioactive materials, safe removal of decay heat, sub-criticality and avoidance of unnecessary radiation exposure must be achieved throughout the complete storage period. The implementation of these safety requirements can be achieved by dry storage of SF and HLW in casks as well as in other systems such as dry vault storage systems or spent fuel pools, where the latter is neither a dry nor a passive system. After the events of Fukushima, the advantages of passively and inherently safe dry storage systems have become more obvious. In Germany, dry storage of SF in casks fulfils both transport and storage requirements. Mostly, storage facilities are designed as concrete buildings above the ground; one storage facility has also been built as a rock tunnel. In all these facilities the safe enclosure of radioactive materials in dry storage casks is achieved by a double-lid sealing system with surveillance of the sealing system. The safe removal of decay heat is ensured by the design of the storage containers and the storage facility, which also secures to reduce the radiation exposure to acceptable levels. TUV and BAM, who work as independent experts for the competent authorities, inform about spent fuel management and issues concerning dry storage of spent nuclear fuel, based on their long experience in these fields. All relevant safety issues such as safe enclosure, shielding, removal of decay heat and sub-criticality are checked and validated with state-of-the-art methods and computer codes before the license approval. In our presentation we discuss which of these aspects need to be examined closer for a long term interim storage. It is shown

  6. The emerging dental workforce: long-term career expectations and influences. A quantitative study of final year dental students' views on their long-term career from one London Dental School.

    Science.gov (United States)

    Gallagher, Jennifer E; Patel, Resmi; Wilson, Nairn H F

    2009-12-23

    career break' (p = 0.01), 'assistance with student debt' (p = 0.01) and 'incentives to work in deprived areas'. Long-term career plans of new graduates from this London Dental School commonly embrace opportunities for professional development as well as personal issues such as work/life balance and financial income. Significant differences were identified between male and females long-term plans and influences. The implications of these findings are discussed.

  7. Long-Term Planning for Open Pits for Mining Sulphide-Oxide Ores in Order to Achieve Maximum Profit

    Science.gov (United States)

    Kržanović, Daniel; Conić, Vesna; Stevanović, Dejan; Kolonja, Božo; Vaduvesković, Jovan

    2017-12-01

    Profitable exploitation of mineralised material from the earth's crust is a complex and difficult task that depends on a comprehensive planning process. Answering the question of how to plan production depends on the geometry of the deposit, as well as the concentration, distribution, and type of minerals in it. The complex nature of mineral deposits largely determines the method of exploitation and profitability of mining operations. In addition to unit operating costs and metal prices, the optimal recovery of and achievement of maximum profit from deposits of sulphide-oxide ores also depend, to a significant extent, on the level of technological recovery achieved in the ore processing procedure. Therefore, in defining a long-term development strategy for open pits, special attention must be paid to the selection of an optimal procedure for ore processing in order to achieve the main objective: maximising the Net Present Value (NPV). The effect of using two different processes, flotation processing and hydrometallurgical methods (bioleaching acid leaching), on determining the ultimate pit is shown in the case of the Kraku Bugaresku-Cementacija sulphide-oxide ore deposit in eastern Serbia. Analysis shows that the application of hydrometallurgical methods of processing sulphide-oxide ore achieved an increase in NPV of 20.42%.

  8. Core-adjacent instrumentation systems for pebble bed reactors for process heat application - state of planning

    International Nuclear Information System (INIS)

    Benninghofen, G.; Serafin, N.; Spillekothen, H.G.; Hecker, R.; Brixy, H.; Serpekian, T.

    1982-06-01

    Planning and theoretical/experimental development work for core surveillance instrumentation systems is being performed to meet requirements of pebble bed reactors for process heat application. Detailed and proved instrumentation concepts are now available for the core-adjacent instrumentation systems. The current work and the results of neutron flux measurements at high temperatures are described. Operation devices for long-term accurate gas outlet temperature measurements up to approximately 1423 deg. K will also be discussed. (author)

  9. Long-term associative learning predicts verbal short-term memory performance.

    Science.gov (United States)

    Jones, Gary; Macken, Bill

    2018-02-01

    Studies using tests such as digit span and nonword repetition have implicated short-term memory across a range of developmental domains. Such tests ostensibly assess specialized processes for the short-term manipulation and maintenance of information that are often argued to enable long-term learning. However, there is considerable evidence for an influence of long-term linguistic learning on performance in short-term memory tasks that brings into question the role of a specialized short-term memory system separate from long-term knowledge. Using natural language corpora, we show experimentally and computationally that performance on three widely used measures of short-term memory (digit span, nonword repetition, and sentence recall) can be predicted from simple associative learning operating on the linguistic environment to which a typical child may have been exposed. The findings support the broad view that short-term verbal memory performance reflects the application of long-term language knowledge to the experimental setting.

  10. Value and innovation of direct-acting antivirals: long-term health outcomes of the strategic plan for the management of hepatitis C in Spain.

    Science.gov (United States)

    Turnes, Juan; Domínguez-Hernández, Raquel; Casado, Miguel Ángel

    2017-12-01

    To assess the long-term healthcare costs and health outcomes in association with the access to new direct-acting antivirals (DAAs), during the first year of the National Strategic Plan for Chronic Hepatitis C (SPCHC) in patients with chronic hepatitis C (CHC) in Spain. A decision tree and a lifetime Markov model were developed to simulate the natural history, morbidity, and mortality of a cohort of 51,900 patients with CHC before (pre-DAA strategy) and after (post-DAA strategy) access to DAAs, following SPCHC approval. The percentage of patients treated, transition probabilities, disease management costs, health state utility values, sustained virologic response rates and treatment costs were obtained from the literature and published data from Spain. The results were expressed in terms of costs (€, 2016), quality-adjusted life years (QALYs) and prevention of clinical events, with an annual discount rate of 3%. The post-DAA strategy would prevent 8,667 cases of decompensated cirrhosis, 5,471 cases of hepatocellular carcinoma, 1,137 liver transplants and 9,608 liver-related deaths. The cohort of 51,900 patients would require investments of 1,606 and 1,230 million euros with the post-DAA and pre-DAA strategies, respectively. This would produce 819,674 and 665,703 QALYs. The use of new DAA-based treatments in CHC patients during the first year after the implementation of the SPCHC significantly reduced long-term morbidity and mortality and increased quality of life; demonstrating that this plan is an efficient use of public health resources.

  11. Untangling Risk in Water Supply Systems: What Factors Drive Long-term Adaptation?

    Science.gov (United States)

    Zeff, H. B.; Lin, L.; Band, L. E.; Reed, P. M.; Characklis, G. W.

    2016-12-01

    Deeply uncertain factors like climate change, the hydrologic impacts of urbanization, forest evolution, and long-term demand forecasts make water supply planning a `wicked' problem. The traditional technique of assessing risk based on historical observations can be inadequate in the face of environmental non-stationarity. However, competing models and limited observational data make it difficult for decision makers and experts to agree on how much uncertainty should be built into analyses of risk, particularly at the timescales relevant to long-term investments in water infrastructure. Further, the physical connectivity of these deeply uncertain processes create inter-related systems, amplifying the challenges of a `worst case scenario'. The development of adaptive systems and planning processes provide solutions that have been shown to meet technical, environmental, and social objectives at lower costs. Instead of developing plans with fixed targets for the timing of actions, adaptive plans develop risk metrics and thresholds that are able to integrate new information to determine when conditions reach a `tipping point' which necessitates action. It is an open question as to how new information can be best integrated into the decision-making process (i.e. how much weight do we give new observations relative to the historical record), but a better understanding of the way the relevant systems are expected to evolve and change over time could inform these decisions. In this study, we use linked, dynamic models of temperature and precipitation changes, forest evolution, urbanization, hydrology, and water demand to develop scenarios for an adaptive water management framework that uses risk-based metrics to make short- and long-term decisions. The impact of individual environmental processes on the adaptive capability of this management framework is evaluated through problem formulations that successively increase the complexity of the uncertainty scenarios. Although

  12. NUMO's approach for long-term safety assessment - 59404

    International Nuclear Information System (INIS)

    Ebashi, Takeshi; Kaku, Kenichi; Ishiguro, Katsuhiko

    2012-01-01

    One of NUMO's policies for ensuring safety is staged and flexible project implementation and decision-making based on iterative confirmation of safety. The safety assessment takes the central role in multiple lines of reasoning and argumentation by providing a quantitative evaluation of long-term safety; a key aspect is uncertainty management. This paper presents NUMO's basic strategies for long-term safety assessment based on the above policy. NUMO's approach considering Japanese boundary conditions is demonstrated as a starting-point for evaluating the long-term safety of an actual site. In Japan, the Act on Final Disposal of Specified Radioactive Waste states that the siting process shall consist of three stages. The Nuclear Waste Management Organization of Japan (NUMO) is responsible for geological disposal of vitrified high-level waste and some types of TRU waste. NUMO has chosen to implement a volunteer approach to siting. NUMO decided to prepare the so-called 2010 technical report, which sets out three safety policies, one of which is staged project implementation and decision-making based on iterative confirmation of safety. Based on this policy, NUMO will gradually integrate relevant interdisciplinary knowledge to build a safety case when a formal volunteer application is received that would allow site investigations to be initiated. The safety assessment takes the central role in multiple lines of reasoning and argumentation by providing a quantitative evaluation of long-term safety; one of a key aspect is uncertainty management. This paper presents the basic strategies for NUMO's long-term safety assessment based on the above policy. In concrete terms, the common procedures involved in safety assessment are applied in a stepwise manner, based on integration of knowledge obtained from site investigations/evaluations and engineered measures. The results of the safety assessment are then reflected in the planning of site investigations and engineered

  13. Long-term monitoring of the Italian forests

    Directory of Open Access Journals (Sweden)

    Pompei E

    2014-02-01

    Full Text Available Long-term monitoring of the Italian forests. The long-term monitoring is an essential tool for the study of the state of health of European forest ecosystems over time, especially in relation to the adaptation strategies adopted in response to changes in climate. In 2008, at the European level, there was a need to review the various existing monitoring networks in the various States in order to plan an integration and a more rational use of the information from each detected. The Project for the integration of monitoring networks was carried out using the instrument of the European LIFE+ funding. The fundamental objective of the project was the renovation and expansion of the main European Networks Monitoring of Forests, improving its representativeness, effectiveness and harmonization between them. In addition, in the period 2009/2010 was carried out the extensive and intensive monitoring of forest ecosystems in Europe. The project, approved and co-financed by the European Commission, has been coordinated at the international level by Johann Heinrich von Thunen-Institute, Germany, and saw the participation of 24 EU member states and 38 partners.

  14. Autonomous soaring and surveillance in wind fields with an unmanned aerial vehicle

    Science.gov (United States)

    Gao, Chen

    Small unmanned aerial vehicles (UAVs) play an active role in developing a low-cost, low-altitude autonomous aerial surveillance platform. The success of the applications needs to address the challenge of limited on-board power plant that limits the endurance performance in surveillance mission. This thesis studies the mechanics of soaring flight, observed in nature where birds utilize various wind patterns to stay airborne without flapping their wings, and investigates its application to small UAVs in their surveillance missions. In a proposed integrated framework of soaring and surveillance, a bird-mimicking soaring maneuver extracts energy from surrounding wind environment that improves surveillance performance in terms of flight endurance, while the surveillance task not only covers the target area, but also detects energy sources within the area to allow for potential soaring flight. The interaction of soaring and surveillance further enables novel energy based, coverage optimal path planning. Two soaring and associated surveillance strategies are explored. In a so-called static soaring surveillance, the UAV identifies spatially-distributed thermal updrafts for soaring, while incremental surveillance is achieved through gliding flight to visit concentric expanding regions. A Gaussian-process-regression-based algorithm is developed to achieve computationally-efficient and smooth updraft estimation. In a so-called dynamic soaring surveillance, the UAV performs one cycle of dynamic soaring to harvest energy from the horizontal wind gradient to complete one surveillance task by visiting from one target to the next one. A Dubins-path-based trajectory planning approach is proposed to maximize wind energy extraction and ensure smooth transition between surveillance tasks. Finally, a nonlinear trajectory tracking controller is designed for a full six-degree-of-freedom nonlinear UAV dynamics model and extensive simulations are carried to demonstrate the effectiveness of

  15. Mining Surveillance and Maintenance Dollars

    International Nuclear Information System (INIS)

    MARTINEZ, R.

    2000-01-01

    Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S and M) activities. However, ongoing S and M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations

  16. Salt brickwork as long-term sealing in salt formations

    International Nuclear Information System (INIS)

    Walter, F.; Yaramanci, U.

    1993-01-01

    Radioactive wastes can be disposed of in deep salt formations. Rock salt is a suitable geologic medium because of its unique characteristics. Open boreholes, shafts and drifts are created to provide physical access to the repository. Long-term seals must be emplaced in these potential pathways to prevent radioactive release into the biosphere. The sealing materials must be mechanically and, most important, geochemically stable within the host rock. Salt bricks made from compressed salt-powder are understood to be the first choice long-term sealing material. Seals built of salt bricks will be ductile. Large sealing systems are built by combining the individual bricks with mortar. Raw materials for mortar are fine-grained halite powder and ground saliferous clay. This provides for the good adhesive strength of the mortar to the bricks and the high shear-strength of the mortar itself. To test the interaction of rock salt with an emplaced long-term seal, experiments will be carried out in situ, in the Asse salt mine in Germany. Simple borehole sealing experiments will be performed in horizontal holes and a complicated drift sealing experiment is planned, to demonstrate the technology of sealing a standard size drift or shaft inside a disturbed rock mass. Especially, the mechanical stability of the sealing system has to be demonstrated

  17. Long-range plan for buried transuranic waste studies at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Low, J.O.

    1985-12-01

    This document presents a plan to perform detailed studies of alternatives considered for the long-term management of buried transuranic waste at the Idaho National Engineering Laboratory (INEL). The studies will provide the technical basis for DOE to make a decision on the future management of that waste. Although the waste is currently being handled in an acceptable manner, new solutions are continually being researched to improve management techniques. Three alternatives are being considered: (a) leave the waste as is; (b) improve in situ confinement of the waste; and (c) retrieve, process, and certify the waste for disposal at a federal repository. Fourteen studies are described in this plan for Alternatives 2 and 3. The leave-as-is alternative involves continuing present procedures for managing the buried waste. An ongoing environmental surveillance program, a low-level-waste stabilization program, and enhanced subsurface migration studies begun in FY-1984 at the INEL will provide data for the decision-making process for the INEL buried TRU waste. These ongoing studies for the leave-as-is alternative are summarized in this plan in limited detail. The improved-confinement alternative involves leaving the waste in place, but providing additional protection against wind, water penetration, erosion, and plant and animal intrusion. Several studies proposed under this alternative will examine special techniques to immobilize or encapsulate the buried waste. An in situ grouting study was implemented at the INEL starting in FY-1985 and will be completed at the end of FY-1986 with the grouting of a simulated INEL buried TRU waste trench. Studies of the third alternative will investigate improved retrieval, processing, and certification techniques. New equipment, such as industrial manipulators and excavating machinery, will be tested in the retrieval studies. Processing and certification studies will examine rapidly changing or new technologies

  18. SNSA surveillance over the ageing effects and ability for long term operation at Krsko NPP

    International Nuclear Information System (INIS)

    Savli, S.; Ferjancic, M.; Pavlin, D.; Lovincic, D.

    2007-01-01

    The paper presents the Slovenian Nuclear Safety Administration (SNSA) tools used for verification the adequacy of management of ageing effects and assuring suitability for long term operation at the Krsko NPP. In addition to tools commonly used as PSR (Periodic Safety Review), assessment of plant modifications, regular inspections, the SNSA applies some special methods like monitoring the condition of important plant structures, systems and components (SSC) through special designed software, review and assessment of important plant programmes and its own set of performance indicators

  19. Long-term storage of radioactive waste: IAEA perspectives on safety and sustainability

    International Nuclear Information System (INIS)

    Rowat, J.H.; Louvat, D.; Metcalf, P.E.

    2006-01-01

    As the amounts of radioactive waste in surface storage have increased, concern has grown over the safety and sustainability of storage in the long term. In response to increasing concerns, the International Atomic Energy Agency (IAEA) has included an action to address the safety implications of the long-term storage (LTS) of radioactive waste in its action plan for waste safety; the action plan was endorsed by the IAEA's Member States in 2001. In 2003, the IAEA published a position paper on the safety and sustainability of LTS as part fulfilment of the action in question. A key theme of the position paper is the contrast of safety and sustainability implications of LTS with those of disposal. The present paper provides a summary of the position paper, describes current IAEA activities that deal with the subject of LTS, and discusses findings from the 2004 Cordoba symposium on disposal of low activity radioactive waste that pertain to LTS. (author)

  20. Mobile Surveillance and Monitoring Robots

    International Nuclear Information System (INIS)

    Kimberly, Howard R.; Shipers, Larry R.

    1999-01-01

    Long-term nuclear material storage will require in-vault data verification, sensor testing, error and alarm response, inventory, and maintenance operations. System concept development efforts for a comprehensive nuclear material management system have identified the use of a small flexible mobile automation platform to perform these surveillance and maintenance operations. In order to have near-term wide-range application in the Complex, a mobile surveillance system must be small, flexible, and adaptable enough to allow retrofit into existing special nuclear material facilities. The objective of the Mobile Surveillance and Monitoring Robot project is to satisfy these needs by development of a human scale mobile robot to monitor the state of health, physical security and safety of items in storage and process; recognize and respond to alarms, threats, and off-normal operating conditions; and perform material handling and maintenance operations. The system will integrate a tool kit of onboard sensors and monitors, maintenance equipment and capability, and SNL developed non-lethal threat response technology with the intelligence to identify threats and develop and implement first response strategies for abnormal signals and alarm conditions. System versatility will be enhanced by incorporating a robot arm, vision and force sensing, robust obstacle avoidance, and appropriate monitoring and sensing equipment

  1. Long-term efficacy of a mini-course in radiation-reducing techniques in invasive cardiology

    International Nuclear Information System (INIS)

    Kuon, E.; Empen, K.; Hummel, A.; Doerr, M.; Reffelmann, T.; Felix, S.B.; Weitmann, K.; Hoffmann, W.; Staudt, A.

    2013-01-01

    Purpose: To validate the long-term efficacy of a 90-min. educational mini-course in less-irradiating cardiac interventional techniques. Materials and Methods: Before, two months after, and two years after the mini-course (periods I, II, and III), we analyzed the following radiation dose parameters for ten coronary angiographies (CA), performed by each of 7 cardiologists: total dose-area product (DAP), radiographic and fluoroscopic DAP fractions, number of radiographic frames and runs, and fluoroscopy time. Results: The median patient DAP for periods I, II and III was 31.4, 15.8 and 8.5 Gy x cm 2 , respectively. The long-term effect was related to shorter median fluoroscopy times (180, 172, and 120 s), shorter (57, 52, and 45) and fewer (12, 12, and 10) radiographic runs, consistent collimation and restriction to an adequate image quality. Both radiographic DAP/frame (28.7, 17.0, and 18.4 mGy x cm 2 ) and fluoroscopic DAP/second (45.7, 24.2, and 10.0 mGy x cm 2 ) decreased significantly. The multivariate linear regression analysis confirmed the increasing efficacy of the mini-course itself (-44.6 and -60.7 %), and revealed a decreasing influence of the interventionalist's experience (-8.6 % and -4.9 % per 1,000 CAs, lifelong performed until the mini-course). The number of CAs performed after the mini-course did not influence the long-term DAP results. Conclusion: The presented educational mini-course allows a significant, long-lasting, and apparently ongoing reduction of patient radiation exposure due to CA. A self-surveillant documentation of relevant radiation parameters is well suited to monitor and improve each operator's individual long-term radiation-reducing efforts. (orig.)

  2. National surveillance plan for infectious bovine rhinotracheitis (IBR) in autochthonous Italian cattle breeds: Results of first year of activity.

    Science.gov (United States)

    Maresca, Carmen; Scoccia, Eleonora; Dettori, Annalisa; Felici, Andrea; Guarcini, Roberta; Petrini, Stefano; Quaglia, Andrea; Filippini, Giovanni

    2018-06-01

    Infectious bovine rhinotracheitis (IBR)/infectious pustular vulvovaginitis (IPV) caused by Bovine alphaherpesvirus 1 (BoHV-1) is a significant disease in domestic and wild cattle. In June 2015, the Ministry of Agriculture, Food and Forestry in Italy approved a national surveillance plan to control and eradicate IBR in beef cattle breeds. The objective of this study was to evaluate the results of the first year of the IBR voluntary surveillance plan in Italy. The aim of the plan is to eradicate IBR in all bovines recorded in the National Herd Book for Italian beef cattle breeds over six years. Monetary incentives are used to encourage breeders to achieve the annual seroprevalence ranges stated in the plan. A Ministerial decree states that all bovines in breeding herds and aged older than 12 months should be serologically tested. Serum samples were tested for presence of the antibody to glycoprotein E of BoHV-1 using commercially available enzyme-linked immunosorbent assays. The national herd seroprevalence was 55.49% (95% confidence interval [CI] 52.01-58.92). Of 25,121 bovines tested for antibodies against BoHV-1, 8014 were positive. The seroprevalence in animals from autochthonous Italian cattle breeds was 31.89% (95% CI 31.31-32.47). Seroprevalence was highest in Podolica cattle (55.14%; 95% CI 54.07-56.21), lowest in Maremmana cattle (9.95%; 95% CI 7.99-12.31), and intermediate in Chianina (22.01%; 95% CI 21.03-23.01), Marchigiana (24.85%; 95% CI 23.52-26.23), and Romagnola (15.60%; 95% CI 14.62-16.64) cattle. These seroprevalence rates indicate a need for intervention to decrease the inevitable severe economic losses arising from BoHV-1 infection. Although some regions in Italy have a long history of combatting BoHV-1 infection, only the province of Bolzano has eradicated IBR. Copyright © 2018 Elsevier B.V. All rights reserved.

  3. Safety, Efficacy, and Persistence of Long-Term Mirabegron Treatment for Overactive Bladder in the Daily Clinical Setting: Interim (1-Year) Report from a Japanese Post-Marketing Surveillance Study.

    Science.gov (United States)

    Kato, Daisuke; Tabuchi, Hiromi; Uno, Satoshi

    2017-08-01

    To report interim 1-year results from a 3-year surveillance study evaluating safety, efficacy, and persistence of long-term mirabegron for overactive bladder (OAB). Patients starting treatment with mirabegron for urinary urgency, daytime frequency, and urgency incontinence associated with OAB were registered and followed up for 3 years. Data were collected on adverse drug reactions (ADR), changes in OAB symptoms, changes in Overactive Bladder Symptom Score (OABSS), and treatment discontinuations. Treatment persistence rates were calculated by Kaplan-Meier analysis. Eighty-one ADR were observed in 72/1139 patients (6.3%) through 1 year of mirabegron treatment, with the incidence highest during the first month. No significant change in residual urine volume was observed at any observation point up to 1 year of mirabegron treatment. Mirabegron was deemed "effective" in 883/1091 patients (80.9%) at 1 year/discontinuation. Total OABSS was decreased with statistical significance at 3 months, 6 months, and 1 year, or at discontinuation (P similar for male and female patients but significantly higher for patients aged ≥65 years (67.3%; n = 908) compared with those aged <65 years (59.8%; n = 231; log-rank test: P = 0.032). Long-term OAB treatment with mirabegron was well-tolerated, with effectiveness maintained through 1 year. Mirabegron treatment persistence was higher than has been previously reported, and was greater in patients aged ≥65 years compared with those aged <65 years. © 2017 John Wiley & Sons Australia, Ltd.

  4. ORNL Long-Range Environmental and Waste Management Plan: Program overview and summary

    International Nuclear Information System (INIS)

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.

    1987-12-01

    The primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirments. The document also provides an estimate of the resources required to implenent the current plan. As with any document of this nature, the near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and relects the efforts preceived to be necesary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. 15 figs., 10 tabs

  5. A stochastic approach to long term operation planning of hydrothermal systems; Uma abordagem estocastica para o planejamento a longo prazo da operacao de sistemas hidrotermicos

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Marinho G. [Sao Paulo Univ., Sao Carlos, SP (Brazil). Inst. de Ciencias Matematicas; Soares, Secundino; Cruz Junior, Gelson da; Vinhal, Cassio D.N. [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Eletrica

    1996-01-01

    This paper is concerned with long term operation of hydro-thermal power systems. The problem is approached by a deterministic optimization technique coupled to an inflow forecasting model in open-loop feedback framework in monthly basis. The paper aims to compare the solution obtained by this approach and Stochastic Dynamic Programming (SDP), which has been accepted for over than two decades as the better solution to deal with inflow uncertainty in long term planning. The comparison was carried out in systems with a single plant, simulating the operation throughout a period of five years under the historical inflow conditions and evaluating the cost of the complementary thermal generation. Results show that the proposed approach can handle uncertainty as effectively as SDP. Furthermore, it does not require modeling simplification, such as composite reservoirs, to deal with multi hydro plant systems. 10 refs., 1 tab.

  6. Report of the Long-Range Planning Committee

    International Nuclear Information System (INIS)

    1984-01-01

    This is the final report of the Long-Range Planning Committee of the Lawrence Livermore National Laboratory. It describes the make-up, purpose, working assumptions, and activities of the Committee and discusses the work done by the Committee on defense matters, energy, a number of additional topics, and future long-range planning activities

  7. Brainstorming opportunities for postmarketing surveillance of chemicals : Workshop report

    NARCIS (Netherlands)

    Olthof ED; van Drongelen A; Graven C; Herremans J; de Kaste D; Ossendorp B; Piersma AH; GZB; V&Z

    2017-01-01

    On behalf of the Ministry of Health a survey was prepared of possibilities for setting up a 'post-marketing surveillance' (PMS)-system for chemical substances in consumer products, including food. With such a system, (long-term) health effects of substances which are already on the market may be

  8. Devising an Indicator to Detect Mid-Term Abortions in Dairy Cattle: A First Step Towards Syndromic Surveillance of Abortive Diseases

    OpenAIRE

    Bronner, Anne; Morignat, Eric; H?naux, Viviane; Madouasse, Aur?lien; Gay, Emilie; Calavas, Didier

    2015-01-01

    Bovine abortion surveillance is essential for human and animal health because it plays an important role in the early warning of several diseases. Due to the limited sensitivity of traditional surveillance systems, there is a growing interest for the development of syndromic surveillance. Our objective was to assess whether, routinely collected, artificial insemination (AI) data could be used, as part of a syndromic surveillance system, to devise an indicator of mid-term abortions in dairy ca...

  9. Long-term management plan INEL transuranic waste

    International Nuclear Information System (INIS)

    McKinney, J.D.

    1978-12-01

    The Idaho National Engineering Laboratory stores large quantities of transuranic-contaminated waste at its Radioactive Waste Management Complex. This report presents a 10-year plan for management of this transuranic waste and includes descriptions of projects involving nuclear waste storage, retrieval, processing, systems analysis, and environmental science. Detailed project schedules and work breakdown charts are provided to give the reader a clear view of transuranic waste management objectives

  10. Reforming Long-Term Care Funding in Alberta.

    Science.gov (United States)

    Crump, R Trafford; Repin, Nadya; Sutherland, Jason M

    2015-01-01

    Like many provinces across Canada, Alberta is facing growing demand for long-term care. Issues with the mixed funding model used to pay long-term care providers had Alberta Health Services concerned that it was not efficiently meeting the demand for long-term care. Consequently, in 2010, Alberta Health Services introduced the patient/care-based funding (PCBF) model. PCBF is similar to activity-based funding in that it directly ties the complexity and care needs of long-term care residents to the payment received by long-term care providers. This review describes PCBF and discusses some of its strengths and weaknesses. In doing so, this review is intended to inform other provinces faced with similar long-term care challenges and contemplating their own funding reforms.

  11. Preparing for long-term data preservation and access in CMS

    Energy Technology Data Exchange (ETDEWEB)

    Lassila-Perini, Kati [Helsinki Inst. of Phys.; Colling, David [Imperial Coll., London; Malik, Sudhir [Nebraska U.; Marco, Jesus [Cantabria Inst. of Phys.; Sexton-Kennedy, Elizabeth [Fermilab; Taylor, Lucas [Fermilab; Tenchini, Roberto [INFN, Pisa

    2012-01-01

    The data collected by the LHC experiments are unique and present an opportunity and a challenge for a long-term preservation and re-use. The CMS experiment has defined a policy for the data preservation and access to its data and is starting its implementation. This note describes the driving principles of the policy and summarises the actions and activities which are planned in the starting phase of the project.

  12. Long-term trends in the ionosphere and upper atmosphere parameters

    Czech Academy of Sciences Publication Activity Database

    Bremer, J.; Alfonsi, L.; Pal, B.; Laštovička, Jan; Mikhailov, A. V.; Rogers, N.

    47 /suppl./, 2/3 (2004), s. 1009-1029 ISSN 1593-5213. [Final Meeting COST271 Action. Effects of the upper atmosphere on terrestrial and Earth-space communications (EACOS). Abingdon, 26.08.2004-27.08.2004] R&D Projects: GA MŠk OC 271.10 Institutional research plan: CEZ:AV0Z3042911 Keywords : long-term trends * ionosphere * upper atmosphere Subject RIV: DG - Athmosphere Sciences, Meteorology Impact factor: 0.413, year: 2004

  13. Canada's plan for the long-term management of used nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Shaver, K. [Nuclear Waste Management Organization, Toronto, ON (Canada)

    2015-07-01

    Our mission is to develop and implement collaboratively with Canadians, a management approach for the long-term care of Canada's used nuclear fuel that is socially acceptable, technically sound, environmentally responsible, and economically feasible. The technical method is for Isolation of used nuclear fuel in deep geological repository with continuous monitoring and potential for retrievability.

  14. The emerging dental workforce: long-term career expectations and influences. A quantitative study of final year dental students' views on their long-term career from one London Dental School

    Directory of Open Access Journals (Sweden)

    Wilson Nairn HF

    2009-12-01

    ' (p = 0.02, 'retraining facilities after career break' (p = 0.01, 'assistance with student debt' (p = 0.01 and 'incentives to work in deprived areas'. Conclusion Long-term career plans of new graduates from this London Dental School commonly embrace opportunities for professional development as well as personal issues such as work/life balance and financial income. Significant differences were identified between male and females long-term plans and influences. The implications of these findings are discussed.

  15. Innovative Strategy For Long Term Monitoring Of Metal And Radionuclide Plumes

    International Nuclear Information System (INIS)

    Eddy-Dilek, Carol; Millings, Margaret R.; Looney, Brian B.; Denham, Miles E.

    2014-01-01

    Many government and private industry sites that were once contaminated with radioactive and chemical wastes cannot be cleaned up enough to permit unrestricted human access. The sites will require long term management, in some cases indefinitely, leaving site owners with the challenge of protecting human health and environmental quality at these 'legacy' sites. Long-term monitoring of groundwater contamination is one of the largest projected costs in the life cycle of environmental management at the Savannah River Site, the larger DOE complex, and many large federal and private sites. There is a need to optimize the performance and manage the cost of long term surveillance and monitoring at their sites. Currently, SRNL is initiating a pilot field test using alternative protocols for long term monitoring of metals and radionuclides. A key component of the approach is that monitoring efforts are focused on measurement of low cost metrics related to hydrologic and chemical conditions that control contaminant migration. The strategy combines careful monitoring of hydrologic boundary conditions with measurement of master variables such as chemical surrogates along with a smaller number of standard well analyses. In plumes contaminated with metals, master variables control the chemistry of the groundwater system, and include redox variables (ORP, DO, chemicals), pH, specific conductivity, biological community (breakdown/decay products), and temperature. Significant changes in these variables will result in conditions whereby the plume may not be stable and therefore can be used to predict possible plume migration. Conversely, concentration measurements for all types of contaminants in groundwater are a lagging indicator plume movement - major changes contaminant concentrations indicate that contamination has migrated. An approach based on measurement of master variables and explicit monitoring of hydrologic boundary conditions combined with traditional metrics should lead

  16. Innovative Strategy For Long Term Monitoring Of Metal And Radionuclide Plumes

    Energy Technology Data Exchange (ETDEWEB)

    Eddy-Dilek, Carol; Millings, Margaret R.; Looney, Brian B.; Denham, Miles E.

    2014-01-08

    Many government and private industry sites that were once contaminated with radioactive and chemical wastes cannot be cleaned up enough to permit unrestricted human access. The sites will require long term management, in some cases indefinitely, leaving site owners with the challenge of protecting human health and environmental quality at these "legacy" sites. Long-term monitoring of groundwater contamination is one of the largest projected costs in the life cycle of environmental management at the Savannah River Site, the larger DOE complex, and many large federal and private sites. There is a need to optimize the performance and manage the cost of long term surveillance and monitoring at their sites. Currently, SRNL is initiating a pilot field test using alternative protocols for long term monitoring of metals and radionuclides. A key component of the approach is that monitoring efforts are focused on measurement of low cost metrics related to hydrologic and chemical conditions that control contaminant migration. The strategy combines careful monitoring of hydrologic boundary conditions with measurement of master variables such as chemical surrogates along with a smaller number of standard well analyses. In plumes contaminated with metals, master variables control the chemistry of the groundwater system, and include redox variables (ORP, DO, chemicals), pH, specific conductivity, biological community (breakdown/decay products), and temperature. Significant changes in these variables will result in conditions whereby the plume may not be stable and therefore can be used to predict possible plume migration. Conversely, concentration measurements for all types of contaminants in groundwater are a lagging indicator plume movement - major changes contaminant concentrations indicate that contamination has migrated. An approach based on measurement of master variables and explicit monitoring of hydrologic boundary conditions combined with traditional metrics should lead

  17. Long-term corrosion studies

    International Nuclear Information System (INIS)

    Gdowski, G.

    1998-01-01

    The scope of this activity is to assess the long-term corrosion properties of metallic materials under consideration for fabricating waste package containers. Three classes of metals are to be assessed: corrosion resistant, intermediate corrosion resistant, and corrosion allowance. Corrosion properties to be evaluated are general, pitting and crevice corrosion, stress-corrosion cracking, and galvanic corrosion. The performance of these materials will be investigated under conditions that are considered relevant to the potential emplacement site. Testing in four aqueous solutions, and vapor phases above them, and at two temperatures are planned for this activity. (The environmental conditions, test metals, and matrix are described in detail in Section 3.0.) The purpose and objective of this activity is to obtain the kinetic and mechanistic information on degradation of metallic alloys currently being considered for waste package containers. This information will be used to provide assistance to (1) waste package design (metal barrier selection) (E-20-90 to E-20-92), (2) waste package performance assessment activities (SIP-PA-2), (3) model development (E-20-75 to E-20-89). and (4) repository license application

  18. Look Ahead: Long-Range Learning Plans

    Science.gov (United States)

    Weinstein, Margery

    2010-01-01

    Faced with an unsteady economy and fluctuating learning needs, planning a learning strategy designed to last longer than the next six months can be a tall order. But a long-range learning plan can provide a road map for success. In this article, four companies (KPMG LLP, CarMax, DPR Construction, and EMC Corp.) describe their learning plans, and…

  19. Industrial Foundations as Long-Term Owners

    DEFF Research Database (Denmark)

    Thomsen, Steen; Poulsen, Thomas; Børsting, Christa Winther

    Short-termism has become a serious concern for corporate governance, and this has inspired a search for institutional arrangements to promote long-term decision-making. In this paper, we call attention to long-term ownership by industrial foundations, which is common in Northern Europe but little...... known in the rest of the world. We use a unique Danish data set to document that industrial foundations are long-term owners that practice long-term governance. We show that foundation ownership is highly stable compared to other ownership structures. Foundation-owned companies replace managers less...... frequently. They have conservative capital structures with low financial leverage. They score higher on an index of long-termism in finance, investment, and employment. They survive longer. Overall, our paper supports the hypothesis that corporate time horizons are influenced by ownership structures...

  20. Long-term associative learning predicts verbal short-term memory performance

    OpenAIRE

    Jones, Gary; Macken, Bill

    2017-01-01

    Studies using tests such as digit span and nonword repetition have implicated short-term memory across a range of developmental domains. Such tests ostensibly assess specialized processes for the short-term manipulation and maintenance of information that are often argued to enable long-term learning. However, there is considerable evidence for an influence of long-term linguistic learning on performance in short-term memory tasks that brings into question the role of a specialized short-term...

  1. The changes in perception of visual illusions during long-term isolation

    Czech Academy of Sciences Publication Activity Database

    Šikl, Radovan; Šimeček, Michal; Lukavský, Jiří

    2009-01-01

    Roč. 2009, č. 38 (2009), s. 31-32 ISSN 0301-0066. [European Conference on Visual Perception. 24.08.2009-28.08.2009, Regensburg] R&D Projects: GA ČR GA406/09/2003 Institutional research plan: CEZ:AV0Z70250504 Keywords : long-term isolation * geometrical illusions * perspective Subject RIV: AN - Psychology http://www.perceptionweb.com/abstract.cgi?id=v090766

  2. An evolutionary algorithm technique for intelligence, surveillance, and reconnaissance plan optimization

    Science.gov (United States)

    Langton, John T.; Caroli, Joseph A.; Rosenberg, Brad

    2008-04-01

    To support an Effects Based Approach to Operations (EBAO), Intelligence, Surveillance, and Reconnaissance (ISR) planners must optimize collection plans within an evolving battlespace. A need exists for a decision support tool that allows ISR planners to rapidly generate and rehearse high-performing ISR plans that balance multiple objectives and constraints to address dynamic collection requirements for assessment. To meet this need we have designed an evolutionary algorithm (EA)-based "Integrated ISR Plan Analysis and Rehearsal System" (I2PARS) to support Effects-based Assessment (EBA). I2PARS supports ISR mission planning and dynamic replanning to coordinate assets and optimize their routes, allocation and tasking. It uses an evolutionary algorithm to address the large parametric space of route-finding problems which is sometimes discontinuous in the ISR domain because of conflicting objectives such as minimizing asset utilization yet maximizing ISR coverage. EAs are uniquely suited for generating solutions in dynamic environments and also allow user feedback. They are therefore ideal for "streaming optimization" and dynamic replanning of ISR mission plans. I2PARS uses the Non-dominated Sorting Genetic Algorithm (NSGA-II) to automatically generate a diverse set of high performing collection plans given multiple objectives, constraints, and assets. Intended end users of I2PARS include ISR planners in the Combined Air Operations Centers and Joint Intelligence Centers. Here we show the feasibility of applying the NSGA-II algorithm and EAs in general to the ISR planning domain. Unique genetic representations and operators for optimization within the ISR domain are presented along with multi-objective optimization criteria for ISR planning. Promising results of the I2PARS architecture design, early software prototype, and limited domain testing of the new algorithm are discussed. We also present plans for future research and development, as well as technology

  3. Research on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal years 2015-2021

    International Nuclear Information System (INIS)

    Umeda, Koji; Yasue, Ken-ichi; Saito-Kokubu, Yoko; Niwa, Masakazu; Asamori, Koichi; Fujita, Natsuko; Shimizu, Mayuko; Shimada, Akiomi; Matsubara, Akihiro; Tamura, Hajimu; Yokoyama, Tatsunori; Watanabe, Takahiro; Tokuyasu, Kayoko; Hama, Yuki

    2015-08-01

    The study on long-term geological stability has three objectives, namely, (1) development of technologies for determining the past and present conditions of the geological environment, (2) development of technologies for long-term prediction and evaluation of impacts and (3) development of dating techniques using advanced equipment on isotope geology and geochronology, in order to make contribution to site investigation and safety assessment for the geological disposal of high-level radioactive waste (HLW). This report is to outline 7 years plan (fiscal years 2015-2021) of research and development (R and D) for geosphere stability for long-term isolation of the HLW in Japan Atomic Energy Agency. Background of this research is clarified with the necessity and the significance for site investigation and safety assessment, and the past progress in this report. The objectives, outline, contents and schedule during the next 7 years are described in detail. In addition, the plan framework is structured into the following categories: (1) Development and Systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  4. Ministers of Health: short-term tenure for long-term goals?

    Science.gov (United States)

    Ferraz, Marcos Bosi; Azevedo, Rafael Teixeira

    2011-03-01

    Healthcare investments should consider short and long-term demands. The objectives here were to compare the average tenures of ministers of health in Brazil and in another 22 countries and to evaluate the relationship between ministers' tenures and a number of indicators. Descriptive study conducted at Centro Paulista de Economia da Saúde (CPES). Twenty-two countries with the highest Human Development Indices (HDIs) and Brazil were included. The number of ministers over the past 20 years was investigated through each country's Ministry of Health website. Pearson's correlation coefficient was used to compare the number of ministers in each country with that country's indicators. The Mann-Whitney test was used to compare ministers' tenures in Brazil and other countries. The mean tenure (standard deviation, SD) of Brazilian ministers of health was 15 (12) months, a period that is statistically significantly shorter than the mean tenure of 33 (18) months in the other 22 countries (P < 0.05). There was a moderate and statistically significant positive correlation between the number of ministers and mortality rates for several conditions. The number of ministers also presented moderate and statistically significant negative correlations with per capita total healthcare expenditure (r = -0.567) and with per capita government healthcare expenditure (r = -0.530). On average, ministers of health have extremely short tenures. There is an urgent need to think and plan healthcare systems from a long-term perspective.

  5. Long-term efficacy of a mini-course in radiation-reducing techniques in invasive cardiology

    Energy Technology Data Exchange (ETDEWEB)

    Kuon, E. [Klinik Fraenkische Schweiz, Ebermannstadt (Germany). Abt. fuer Kardiologie; Empen, K.; Hummel, A.; Doerr, M.; Reffelmann, T.; Felix, S.B. [Ernst-Moritz-Arndt-Universitaet, Greifswald (Germany). Abt. fuer Innere Medizin B; Weitmann, K.; Hoffmann, W. [Ernst-Moritz-Arndt-Universitaet, Greifswald (Germany). Inst. fuer Versorgungsmedizin; Staudt, A. [Helios Kliniken, Schwerin (Germany). Abt. fuer Kardiologie und Angiologie

    2013-08-15

    Purpose: To validate the long-term efficacy of a 90-min. educational mini-course in less-irradiating cardiac interventional techniques. Materials and Methods: Before, two months after, and two years after the mini-course (periods I, II, and III), we analyzed the following radiation dose parameters for ten coronary angiographies (CA), performed by each of 7 cardiologists: total dose-area product (DAP), radiographic and fluoroscopic DAP fractions, number of radiographic frames and runs, and fluoroscopy time. Results: The median patient DAP for periods I, II and III was 31.4, 15.8 and 8.5 Gy x cm{sup 2}, respectively. The long-term effect was related to shorter median fluoroscopy times (180, 172, and 120 s), shorter (57, 52, and 45) and fewer (12, 12, and 10) radiographic runs, consistent collimation and restriction to an adequate image quality. Both radiographic DAP/frame (28.7, 17.0, and 18.4 mGy x cm{sup 2}) and fluoroscopic DAP/second (45.7, 24.2, and 10.0 mGy x cm{sup 2}) decreased significantly. The multivariate linear regression analysis confirmed the increasing efficacy of the mini-course itself (-44.6 and -60.7 %), and revealed a decreasing influence of the interventionalist's experience (-8.6 % and -4.9 % per 1,000 CAs, lifelong performed until the mini-course). The number of CAs performed after the mini-course did not influence the long-term DAP results. Conclusion: The presented educational mini-course allows a significant, long-lasting, and apparently ongoing reduction of patient radiation exposure due to CA. A self-surveillant documentation of relevant radiation parameters is well suited to monitor and improve each operator's individual long-term radiation-reducing efforts. (orig.)

  6. Surface Environmental Surveillance Procedures Manual

    International Nuclear Information System (INIS)

    Hanf, Robert W.; Poston, Ted M.

    2000-01-01

    Shows and explains certain procedures needed for surface environmental surveillance. Hanford Site environmental surveillance is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) under the Surface Environmental Surveillance Project (SESP). The basic requirements for site surveillance are set fourth in DOE Order 5400.1, General Environmental Protection Program Requirements. Guidance for the SESP is provided in DOE Order 5484.1, Environmental Protection, Safety, and Health Protection Information Reporting Requirements and DOE Order 5400.5, Radiation Protection of the Public and Environment. Guidelines for environmental surveillance activities are provided in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. An environmental monitoring plan for the Hanford Site is outlined in DOE/RL 91-50 Rev. 2, Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Environmental surveillance data are used in assessing the impact of current and past site operations on human health and the environment, demonstrating compliance with applicable local, state, and federal environmental regulations, and verifying the adequacy of containment and effluent controls. SESP sampling schedules are reviewed, revised, and published each calendar year in the Hanford Site Environmental Surveillance Master Sampling Schedule. Environmental samples are collected by SESP staff in accordance with the approved sample collection procedures documented in this manual. Personnel training requirements are documented in SESP-TP-01 Rev.2, Surface Environmental Surveillance Project Training Program.

  7. Long-term collections

    CERN Multimedia

    Collectes à long terme

    2007-01-01

    The Committee of the Long Term Collections (CLT) asks for your attention for the following message from a young Peruvian scientist, following the earthquake which devastated part of her country a month ago.

  8. The connection between long-term and short-term risk management strategies: examples from land-use planning and emergency management in four European case studies

    Science.gov (United States)

    Prenger-Berninghoff, K.; Cortes, V. J.; Sprague, T.; Aye, Z. C.; Greiving, S.; Głowacki, W.; Sterlacchini, S.

    2014-04-01

    The need for continuous adaptation to complex and unforeseen events requires enhancing the links between planning and preparedness phases to reduce future risks in the most efficient way. In this context, the legal-administrative and cultural context has to be taken into account. This is why four case study areas of the CHANGES1 project (Nehoiu Valley in Romania, Ubaye Valley in France, Val Canale in Italy, and Wieprzówka catchment in Poland) serve as examples to highlight currently implemented risk management strategies for land-use planning and emergency preparedness. The strategies described in this paper were identified by means of exploratory and informal interviews in each study site. Results reveal that a dearth or, in very few cases, a weak link exists between spatial planners and emergency managers. Management strategies could benefit from formally intensifying coordination and cooperation between emergency services and spatial planning authorities. Moreover, limited financial funds urge for a more efficient use of resources and better coordination towards long-term activities. The research indicates potential benefits to establishing or, in some cases, strengthening this link and provides suggestions for further development in the form of information and decision support systems as a key connection point. Aside from the existent information systems for emergency management, it was found that a common platform, which integrates involvement of these and other relevant actors could enhance this connection and address expressed stakeholder needs. 1 Marie Curie ITN CHANGES - Changing Hydro-meteorological Risks as Analyzed by a New Generation of European Scientists.

  9. A United States perspective on long term management of areas contaminated with radioactive materials

    International Nuclear Information System (INIS)

    Jones, C.R.

    2003-01-01

    Full text: The United States has far-reaching experience in the long-term management of areas contaminated with radioactive materials. The events resulting from the atmospheric testing of nuclear weapons in the Marshall Islands, follow-up from Hiroshima and Nagasaki, accidents, and the environmental cleanup of our weapons complex have resulted in an extensive body of lessons learned and best practices. The lack of trust created in the affected population, regardless of cause of the spread of radioactive material, creates the working environment for long-term management of the situation. The extent of advanced planning for such an event will define and bound your ultimate success in reaching a conclusion acceptable to the affected parties. The two key issues to be addressed in the long-term management of areas contaminated with radioactive materials are the two 'T's' - technical and trust. The technical issues to be resolved include: access to the affected area; infrastructure to support operations; local and imported staffing; health care for the affected population; and payment to name a few. In addressing the issue of trust it is critical to establish open, honest and inclusive communications and decision making with the affected population and stakeholders, with clear roles and responsibilities defined. Actions must be sensitive to local cultural issues and agreements reached with affected populations prior to actions being taken. Establishment of an alternative views resolution process helps build trust and allow actions to taken. Government to government relations and agreements must be established with an acceptance and understanding of the long term investment in time and resources needed. Planning ahead for such an eventuality and putting in place procedures, agreements and resources needed to address the technical and trust issues associated with the long-term management of areas contaminated with radioactive materials enhances success. (author)

  10. Long-term stabilization of uranium mill tailings

    International Nuclear Information System (INIS)

    Voorhees, L.D.; Sale, M.J.; Webb, J.W.; Mulholland, P.J.

    1984-01-01

    The primary hazard associated with uranium mill tailings is exposure to a radioactive gas, radon-222, the concentration of which has been correlated with the occurrence of lung cancer. Previous studies on radon attenuation conclude that the placement of earthen cover materials over the tailings is the most effective technique for reducing radioactive emissions and dispersal of tailings. The success of such a plan, however, is dependent on ensuring the long-term integrity of these cover materials. Soil erosion from water and wind is the major natural cause of destabilizing earthen cover materials. Field data related to the control of soil loss are limited and only indirectly apply to the problem of isolation of uranium mill tailings over very long time periods (up to 80,000 a). However, sufficient information is available to determine benefits that will result from changes in specific design variables and to evaluate the need for different design strategies among potential disposal sites. The three major options available for stabilization of uranium mill tailings are (1) rock cover, (2) soil and revegetation, or (3) a combination of both on different portions of the tailings cover. The optimal choice among these alternatives depends on site-specific characteristics such as climate and local geomorphology and soils, and on design variables such as embankment heights and slopes, modification of upstream drainage, and revegetation practices. Generally, geomorphic evidence suggests that use of soil and vegetation alone will not be adequate to reduce erosion on slopes greater than about 5 to 9%. For these steeper slopes, the use of rock talus or riprap will be necessary to maximize the probability of long-term stability. The use of vegetation to control erosion on the flatter portions of the site may be practicable in regions of the USA with sufficient rainfall and suitable soil types, but revegetation practices must be carefully evaluated to ensure that long-term

  11. Preparedness of elderly long-term care facilities in HSE East for influenza outbreaks.

    LENUS (Irish Health Repository)

    O'Connor, L

    2015-01-01

    Abstract We assessed preparedness of HSE East elderly long-term care facilities for an influenza outbreak, and identified Public Health Department support needs. We surveyed 166 facilities based on the HSE checklist document for influenza outbreaks, with 58% response rate. Client flu vaccination rates were > 75%; leading barriers were client anxiety and consent issues. Target flu vaccine uptake of 40% in staff occurred in 43% of facilities and was associated with staff vaccine administration by afacility-attached GP (p = 0.035), having a facility outbreak plan (p = 0.013) and being anon-HSE run facility (p = 0.013). Leading barriers were staff personal anxiety (94%) and lack of awareness of the protective effect on clients (21%). Eighty-nine percent found Public Health helpful, and requested further educational support and advocacy. Staff vaccine uptake focus, organisational leadership, optimal vaccine provision models, outbreak plans and Public Health support are central to the influenza campaign in elderly long-term care facilities.

  12. Applying Psychological Theories to Promote Long-Term Maintenance of Health Behaviors

    Science.gov (United States)

    Joseph, Rodney P.; Daniel, Casey L.; Thind, Herpreet; Benitez, Tanya J.; Pekmezi, Dori

    2014-01-01

    Behavioral health theory provides a framework for researchers to design, implement, and evaluate the effects of health promotion programs. However, limited research has examined theories used in interventions to promote long-term maintenance of health behaviors. The purpose of this review was to evaluate the available literature and identify prominent behavioral health theories used in intervention research to promote maintenance of health behaviors. We reviewed theories used in intervention research assessing long-term maintenance (≥ 6 months post-intervention) of physical activity, weight loss, and smoking cessation. Five prominent behavioral theories were referenced by the 34 studies included in the review: Self-Determination Theory, Theory of Planned Behavior, Social Cognitive Theory, Transtheoretical Model, and Social Ecological Model. Descriptions and examples of applications of these theories are provided. Implications for future research are discussed. PMID:28217036

  13. Research into care quality criteria for long-term care institutions.

    Science.gov (United States)

    Wang, Wen-Liang; Chang, Hong-Jer; Liu, An-Chi; Chen, Yu-Wen

    2007-12-01

    The purpose of this paper was to determine the criteria that reflect the quality of care provided by long-term care institutions. Research was conducted using a two-step procedure that first utilized the SERVQUAL model with Fuzzy Delphi Method to establish the proper criteria by which service quality could be measured. A total of 200 questionnaires were mailed to expert respondents, of which 89 were returned and 77 deemed valid for use in this study. We then applied the Multi-Criteria Decision Making Process to determine the degree of importance of each criterion to long-term care institution service quality planning work. Secondly, 200 questionnaires were distributed and 74 valid responses were returned. Based on the 5 SERVQUAL model constructs, this study found 17 of the 28 criteria, to be pertinent to nursing care quality, with those in the Responsiveness and Empathy domains being the ones most critical.

  14. Compensation for PKMζ in long-term potentiation and spatial long-term memory in mutant mice.

    Science.gov (United States)

    Tsokas, Panayiotis; Hsieh, Changchi; Yao, Yudong; Lesburguères, Edith; Wallace, Emma Jane Claire; Tcherepanov, Andrew; Jothianandan, Desingarao; Hartley, Benjamin Rush; Pan, Ling; Rivard, Bruno; Farese, Robert V; Sajan, Mini P; Bergold, Peter John; Hernández, Alejandro Iván; Cottrell, James E; Shouval, Harel Z; Fenton, André Antonio; Sacktor, Todd Charlton

    2016-05-17

    PKMζ is a persistently active PKC isoform proposed to maintain late-LTP and long-term memory. But late-LTP and memory are maintained without PKMζ in PKMζ-null mice. Two hypotheses can account for these findings. First, PKMζ is unimportant for LTP or memory. Second, PKMζ is essential for late-LTP and long-term memory in wild-type mice, and PKMζ-null mice recruit compensatory mechanisms. We find that whereas PKMζ persistently increases in LTP maintenance in wild-type mice, PKCι/λ, a gene-product closely related to PKMζ, persistently increases in LTP maintenance in PKMζ-null mice. Using a pharmacogenetic approach, we find PKMζ-antisense in hippocampus blocks late-LTP and spatial long-term memory in wild-type mice, but not in PKMζ-null mice without the target mRNA. Conversely, a PKCι/λ-antagonist disrupts late-LTP and spatial memory in PKMζ-null mice but not in wild-type mice. Thus, whereas PKMζ is essential for wild-type LTP and long-term memory, persistent PKCι/λ activation compensates for PKMζ loss in PKMζ-null mice.

  15. Effective production planning for purchased part under long lead time and uncertain demand: MRP Vs demand-driven MRP

    Science.gov (United States)

    Shofa, M. J.; Moeis, A. O.; Restiana, N.

    2018-04-01

    MRP as a production planning system is appropriate for the deterministic environment. Unfortunately, most production systems such as customer demands are stochastic, so that MRP is inappropriate at the time. Demand-Driven MRP (DDMRP) is new approach for production planning system dealing with demand uncertainty. The objective of this paper is to compare the MRP and DDMRP for purchased part under long lead time and uncertain demand in terms of average inventory levels. The evaluation is conducted through a discrete event simulation with the long lead time and uncertain demand scenarios. The next step is evaluating the performance of DDMRP by comparing the inventory level of DDMRP with MRP. As result, DDMRP is more effective production planning than MRP in terms of average inventory levels.

  16. Comparing multi-criteria decision analysis and integrated assessment to support long-term water supply planning.

    Directory of Open Access Journals (Sweden)

    Lisa Scholten

    Full Text Available We compare the use of multi-criteria decision analysis (MCDA-or more precisely, models used in multi-attribute value theory (MAVT-to integrated assessment (IA models for supporting long-term water supply planning in a small town case study in Switzerland. They are used to evaluate thirteen system scale water supply alternatives in four future scenarios regarding forty-four objectives, covering technical, social, environmental, and economic aspects. The alternatives encompass both conventional and unconventional solutions and differ regarding technical, spatial and organizational characteristics. This paper focuses on the impact assessment and final evaluation step of the structured MCDA decision support process. We analyze the performance of the alternatives for ten stakeholders. We demonstrate the implications of model assumptions by comparing two IA and three MAVT evaluation model layouts of different complexity. For this comparison, we focus on the validity (ranking stability, desirability (value, and distinguishability (value range of the alternatives given the five model layouts. These layouts exclude or include stakeholder preferences and uncertainties. Even though all five led us to identify the same best alternatives, they did not produce identical rankings. We found that the MAVT-type models provide higher distinguishability and a more robust basis for discussion than the IA-type models. The needed complexity of the model, however, should be determined based on the intended use of the model within the decision support process. The best-performing alternatives had consistently strong performance for all stakeholders and future scenarios, whereas the current water supply system was outperformed in all evaluation layouts. The best-performing alternatives comprise proactive pipe rehabilitation, adapted firefighting provisions, and decentralized water storage and/or treatment. We present recommendations for possible ways of improving water

  17. Viability staining and animal infectivity of Cryptosporidium andersoni oocysts after long-term storage

    Czech Academy of Sciences Publication Activity Database

    Kváč, Martin; Květoňová, Dana; Salát, Jiří; Ditrich, Oleg

    2007-01-01

    Roč. 100, č. 2 (2007), s. 213-217 ISSN 0932-0113 R&D Projects: GA ČR GA524/05/0992 Institutional research plan: CEZ:AV0Z60220518 Keywords : Cryptosporidium and ersoni * viability * infectivity * long-term storage Subject RIV: EG - Zoology Impact factor: 1.512, year: 2007

  18. Long-term mobile phone use and the risk of vestibular schwannoma: a Danish nationwide cohort study.

    Science.gov (United States)

    Schüz, Joachim; Steding-Jessen, Marianne; Hansen, Søren; Stangerup, Sven-Eric; Cayé-Thomasen, Per; Poulsen, Aslak Harbo; Olsen, Jørgen H; Johansen, Christoffer

    2011-08-15

    Vestibular schwannomas grow in the region within the brain where most of the energy by radiofrequency electromagnetic fields from using mobile phones is absorbed. The authors used 2 Danish nationwide cohort studies, one a study of all adult Danes subscribing for a mobile phone in 1995 or earlier and one on sociodemographic factors and cancer risk, and followed subjects included in both cohorts for occurrence of vestibular schwannoma up to 2006 inclusively. In this study including 2.9 million subjects, a long-term mobile phone subscription of ≥11 years was not related to an increased vestibular schwannoma risk in men (relative risk estimate = 0.87, 95% confidence interval: 0.52, 1.46), and no vestibular schwannoma cases among long-term subscribers occurred in women versus 1.6 expected. Vestibular schwannomas did not occur more often on the right side of the head, although the majority of Danes reported holding their mobile phone to the right ear. Vestibular schwannomas in long-term male subscribers were not of larger size than expected. Overall, no evidence was found that mobile phone use is related to the risk of vestibular schwannoma. Because of the usually slow growth of vestibular schwannoma and possible diagnostic delay, further surveillance is indicated.

  19. Cancer survivorship: history, quality-of-life issues, and the evolving multidisciplinary approach to implementation of cancer survivorship care plans.

    Science.gov (United States)

    Morgan, Mary Ann

    2009-07-01

    To discuss the history of cancer survivorship, related quality-of-life issues, and cancer survivorship care plans (CSCPs). CINAHL, PubMed, published articles, and Web sites. A cancer survivor is an individual who has been diagnosed with cancer, regardless of when that diagnosis was received, who is still living. Cancer survivorship is complex and involves many aspects of care. Major areas of concern for survivors are recurrence, secondary malignancies, and long-term treatment sequelae that affect quality of life. Four essential components of survivorship care are prevention, surveillance, intervention, and coordination. A CSCP should address the survivor's long-term care, such as type of cancer, treatments received, potential side effects, and recommendations for follow-up. It should include preventive practices, how to maintain health and well-being, information on legal protections regarding employment and health insurance, and psychosocial services in the community. Survivorship care for patients with cancer requires a multidisciplinary effort and team approach. Enhanced knowledge of long-term complications of survivorship is needed for healthcare providers. Further research on evidence-based practice for cancer survivorship care also is necessary. Nurses can review CSCPs with patients, instruct them when to seek treatment, promote recommended surveillance protocols, and encourage behaviors that lead to cancer prevention and promote well-being for cancer survivors.

  20. Sexuality and Physical Intimacy in Long Term Care: Sexuality, long term care, capacity assessment

    OpenAIRE

    Lichtenberg, Peter A.

    2014-01-01

    Sexuality and sexual needs in older adults remains a neglected area of clinical intervention, particularly so in long term care settings. Because older adults in medical rehabilitation and long term care beds present with significant frailties, and often significant neurocognitive disorders it makes it difficult for occupational therapists and other staff to evaluate the capacity of an older adult resident to participate in sexual relationships. The current paper reviews the current literatur...

  1. Limits on surveillance: frictions, fragilities and failures in the operation of camera surveillance.

    NARCIS (Netherlands)

    Dubbeld, L.

    2004-01-01

    Public video surveillance tends to be discussed in either utopian or dystopian terms: proponents maintain that camera surveillance is the perfect tool in the fight against crime, while critics argue that the use of security cameras is central to the development of a panoptic, Orwellian surveillance

  2. Differences in health status between long-term and short-term benzodiazepine users.

    NARCIS (Netherlands)

    Zandstra, S.M.; Furer, J.W.; Lisdonk, E.H. van de; Bor, J.H.J.; Zitman, F.G.; Weel, C. van

    2002-01-01

    BACKGROUND: Despite generally accepted advice to keep treatment short, benzodiazepines are often prescibed for more than six months. Prevention of long-term benzodiazepine use could be facilitated by the utilisation of risk indicators for long-term use. However, the characteristics of long-term

  3. Ebola Surveillance - Guinea, Liberia, and Sierra Leone.

    Science.gov (United States)

    McNamara, Lucy A; Schafer, Ilana J; Nolen, Leisha D; Gorina, Yelena; Redd, John T; Lo, Terrence; Ervin, Elizabeth; Henao, Olga; Dahl, Benjamin A; Morgan, Oliver; Hersey, Sara; Knust, Barbara

    2016-07-08

    Developing a surveillance system during a public health emergency is always challenging but is especially so in countries with limited public health infrastructure. Surveillance for Ebola virus disease (Ebola) in the West African countries heavily affected by Ebola (Guinea, Liberia, and Sierra Leone) faced numerous impediments, including insufficient numbers of trained staff, community reticence to report cases and contacts, limited information technology resources, limited telephone and Internet service, and overwhelming numbers of infected persons. Through the work of CDC and numerous partners, including the countries' ministries of health, the World Health Organization, and other government and nongovernment organizations, functional Ebola surveillance was established and maintained in these countries. CDC staff were heavily involved in implementing case-based surveillance systems, sustaining case surveillance and contact tracing, and interpreting surveillance data. In addition to helping the ministries of health and other partners understand and manage the epidemic, CDC's activities strengthened epidemiologic and data management capacity to improve routine surveillance in the countries affected, even after the Ebola epidemic ended, and enhanced local capacity to respond quickly to future public health emergencies. However, the many obstacles overcome during development of these Ebola surveillance systems highlight the need to have strong public health, surveillance, and information technology infrastructure in place before a public health emergency occurs. Intense, long-term focus on strengthening public health surveillance systems in developing countries, as described in the Global Health Security Agenda, is needed.The activities summarized in this report would not have been possible without collaboration with many U.S and international partners (http://www.cdc.gov/vhf/ebola/outbreaks/2014-west-africa/partners.html).

  4. Opening the Door: The Experience of Chronic Critical Illness in a Long-Term Acute Care Hospital.

    Science.gov (United States)

    Lamas, Daniela J; Owens, Robert L; Nace, R Nicholas; Massaro, Anthony F; Pertsch, Nathan J; Gass, Jonathon; Bernacki, Rachelle E; Block, Susan D

    2017-04-01

    Chronically critically ill patients have recurrent infections, organ dysfunction, and at least half die within 1 year. They are frequently cared for in long-term acute care hospitals, yet little is known about their experience in this setting. Our objective was to explore the understanding and expectations and goals of these patients and surrogates. We conducted semi-structured interviews with chronically critically ill long-term acute care hospital patients or surrogates. Conversations were recorded, transcribed, and analyzed. One long-term acute care hospital. Chronically critically ill patients, defined by tracheotomy for prolonged mechanical ventilation, or surrogates. Semi-structured conversation about quality of life, expectations, and planning for setbacks. A total of 50 subjects (30 patients and 20 surrogates) were enrolled. Thematic analyses demonstrated: 1) poor quality of life for patients; 2) surrogate stress and anxiety; 3) optimistic health expectations; 4) poor planning for medical setbacks; and 5) disruptive care transitions. Nearly 80% of patient and their surrogate decision makers identified going home as a goal; 38% were at home at 1 year. Our study describes the experience of chronically critically ill patients and surrogates in an long-term acute care hospital and the feasibility of patient-focused research in this setting. Our findings indicate overly optimistic expectations about return home and unmet palliative care needs, suggesting the need for integration of palliative care within the long-term acute care hospital. Further research is also needed to more fully understand the challenges of this growing population of ICU survivors.

  5. Long term trends in prevalence of neural tube defects in Europe

    DEFF Research Database (Denmark)

    Khoshnood, Babak; Loane, Maria; Walle, Hermien de

    2015-01-01

    STUDY QUESTION: What are the long term trends in the total (live births, fetal deaths, and terminations of pregnancy for fetal anomaly) and live birth prevalence of neural tube defects (NTD) in Europe, where many countries have issued recommendations for folic acid supplementation but a policy...... for mandatory folic acid fortification of food does not exist? METHODS: This was a population based, observational study using data on 11 353 cases of NTD not associated with chromosomal anomalies, including 4162 cases of anencephaly and 5776 cases of spina bifida from 28 EUROCAT (European Surveillance......-conceptional folic acid supplementation and existence of voluntary folic acid fortification. FUNDING, COMPETING INTERESTS, DATA SHARING: The study was funded by the European Public Health Commission, EUROCAT Joint Action 2011-2013. HD and ML received support from the European Commission DG Sanco during the conduct...

  6. Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.

    1992-07-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D ampersand D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S ampersand M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D ampersand D contractors are required to prepare formal plans that document the S ampersand M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D ampersand D Program

  7. Patient Specific Characteristic of Brain Dynamic in Interpretation of Long Term EEG Analysis

    Czech Academy of Sciences Publication Activity Database

    Komárek, V.; Paluš, Milan; Hrnčíř, Z.

    2004-01-01

    Roč. 45, Suppl. 3 (2004), s. 51 ISSN 0013-9580. [European Congress on Epileptology /6./. 30.05.2004-03.06.2004, Vienna] R&D Projects: GA MŠk ME 701 Institutional research plan: CEZ:AV0Z1030915 Keywords : brain dynamic * long term EEG analysis Subject RIV: FH - Neurology

  8. Very long-term sequelae of craniopharyngioma.

    Science.gov (United States)

    Wijnen, Mark; van den Heuvel-Eibrink, Marry M; Janssen, Joseph A M J L; Catsman-Berrevoets, Coriene E; Michiels, Erna M C; van Veelen-Vincent, Marie-Lise C; Dallenga, Alof H G; van den Berge, J Herbert; van Rij, Carolien M; van der Lely, Aart-Jan; Neggers, Sebastian J C M M

    2017-06-01

    Studies investigating long-term health conditions in patients with craniopharyngioma are limited by short follow-up durations and generally do not compare long-term health effects according to initial craniopharyngioma treatment approach. In addition, studies comparing long-term health conditions between patients with childhood- and adult-onset craniopharyngioma report conflicting results. The objective of this study was to analyse a full spectrum of long-term health effects in patients with craniopharyngioma according to initial treatment approach and age group at craniopharyngioma presentation. Cross-sectional study based on retrospective data. We studied a single-centre cohort of 128 patients with craniopharyngioma treated from 1980 onwards (63 patients with childhood-onset disease). Median follow-up since craniopharyngioma presentation was 13 years (interquartile range: 5-23 years). Initial craniopharyngioma treatment approaches included gross total resection ( n  = 25), subtotal resection without radiotherapy ( n  = 44), subtotal resection with radiotherapy ( n  = 25), cyst aspiration without radiotherapy ( n  = 8), and 90 Yttrium brachytherapy ( n  = 21). Pituitary hormone deficiencies (98%), visual disturbances (75%) and obesity (56%) were the most common long-term health conditions observed. Different initial craniopharyngioma treatment approaches resulted in similar long-term health effects. Patients with childhood-onset craniopharyngioma experienced significantly more growth hormone deficiency, diabetes insipidus, panhypopituitarism, morbid obesity, epilepsy and psychiatric conditions compared with patients with adult-onset disease. Recurrence-/progression-free survival was significantly lower after initial craniopharyngioma treatment with cyst aspiration compared with other therapeutic approaches. Survival was similar between patients with childhood- and adult-onset craniopharyngioma. Long-term health conditions were comparable after

  9. Causes of death in long-term lung cancer survivors: a SEER database analysis.

    Science.gov (United States)

    Abdel-Rahman, Omar

    2017-07-01

    Long-term (>5 years) lung cancer survivors represent a small but distinct subgroup of lung cancer patients and information about the causes of death of this subgroup is scarce. The Surveillance, Epidemiology and End Results (SEER) database (1988-2008) was utilized to determine the causes of death of long-term survivors of lung cancer. Survival analysis was conducted using Kaplan-Meier analysis and multivariate analysis was conducted using a Cox proportional hazard model. Clinicopathological characteristics and survival outcomes were assessed for the whole cohort. A total of 78,701 lung cancer patients with >5 years survival were identified. This cohort included 54,488 patients surviving 5-10 years and 24,213 patients surviving >10 years. Among patients surviving 5-10 years, 21.8% were dead because of primary lung cancer, 10.2% were dead because of other cancers, 6.8% were dead because of cardiac disease and 5.3% were dead because of non-malignant pulmonary disease. Among patients surviving >10 years, 12% were dead because of primary lung cancer, 6% were dead because of other cancers, 6.9% were dead because of cardiac disease and 5.6% were dead because of non-malignant pulmonary disease. On multivariate analysis, factors associated with longer cardiac-disease-specific survival in multivariate analysis include younger age at diagnosis (p death from primary lung cancer is still significant among other causes of death even 20 years after diagnosis of lung cancer. Moreover, cardiac as well as non-malignant pulmonary causes contribute a considerable proportion of deaths in long-term lung cancer survivors.

  10. Addressing water resources risk in England and Wales: Long term infrastructure planning in a private, regulated industry

    Science.gov (United States)

    Turner, Sean

    2015-04-01

    Water resources planning is a complex and challenging discipline in which decision makers must deal with conflicting objectives, contested socio-economic values and vast uncertainties, including long term hydrological variability. The task is arguably more demanding in England and Wales, where private water companies must adhere to a rigid set of regulatory planning guidelines in order to justify new infrastructural investments. These guidelines prescribe a "capacity expansion" approach to planning: ensure that a deterministic measure of supply, known as "Deployable Output," meets projected demand over a 25-year planning horizon. Deployable Output is derived using a method akin to yield analysis and is commensurate with the maximum rate of supply that a water resources system can sustain without incurring failure under a simulation of historical recorded hydrological conditions. This study examines whether Deployable Output analysis is fit to serve an industry in which: water companies are seeking to invest in cross-company water transfer schemes to deal with loss of water availability brought about by European environmental legislation and an increase in demand driven by population growth; water companies are expected address potential climate change impacts through their planning activities; and regulators wish to benchmark water resource system performance across the separate companies. Of particular interest, then, is the adequacy of Deployable Output analysis as a means to measuring current and future water shortage risk and comparing across supply systems. Data from the UK National River Flow Archive are used to develop a series of hypothetical reservoir systems in two hydrologically contrasting regions -- northwest England/north Wales and Southeast England. The systems are varied by adjusting the draft ratio (ratio of target annual demand to mean annual inflow), the inflow diversity (covariance of streamflow sequences supplying the system), the strength of

  11. Physician visits and preventive care among Asian American and Pacific Islander long-term survivors of colorectal cancer, USA, 1996-2006.

    Science.gov (United States)

    Steele, C Brooke; Townsend, Julie S; Tai, Eric; Thomas, Cheryll C

    2014-03-01

    Published literature on receipt of preventive healthcare services among Asian American and Pacific Islander (API) cancer survivors is scarce. We describe patterns in receipt of preventive services among API long-term colorectal cancer (CRC) survivors. Surveillance, Epidemiology, and End Results registry-Medicare data were used to identify 9,737 API and white patients who were diagnosed with CRC during 1996-2000 and who survived 5 or more years beyond their diagnoses. We examined receipt of vaccines, mammography (females), bone densitometry (females), and cholesterol screening among the survivors and how the physician specialties they visited for follow-up care correlated to services received. APIs were less likely than whites to receive mammography (52.0 vs. 69.3 %, respectively; P Women who visited both PCPs and oncologists compared with PCPs only were more likely to receive mammography (odds ratio = 1.40; 95 % confidence interval, 1.05-1.86). Visits to both PCPs and oncologists were associated with increased use of mammography. Although API survivors visited these specialties more frequently than white survivors, API women may need culturally appropriate outreach to increase their use of this test. Long-term cancer survivors need to be aware of recommended preventive healthcare services, as well as who will manage their primary care and cancer surveillance follow-up.

  12. Family Structure and Long-Term Care Insurance Purchase

    Science.gov (United States)

    Van Houtven, Courtney Harold; Coe, Norma B.; Konetzka, R. Tamara

    2015-01-01

    While it has long been assumed that family structure and potential sources of informal care play a large role in the purchase decisions for long-term care insurance (LTCI), current empirical evidence is inconclusive. Our study examines the relationship between family structure and LTCI purchase and addresses several major limitations of the prior literature by using a long panel of data and considering modern family relationships, such as presence of stepchildren. We find that family structure characteristics from one’s own generation, particularly about one’s spouse, are associated with purchase, but that few family structure attributes from the younger generation have an influence. Family factors that may indicate future caregiver supply are negatively associated with purchase: having a coresidential child, signaling close proximity, and having a currently working spouse, signaling a healthy and able spouse, that LTC planning has not occurred yet, or that there is less need for asset protection afforded by LTCI. Dynamic factors, such as increasing wealth or turning 65, are associated with higher likelihood of LTCI purchase. PMID:25760583

  13. Competitive short-term and long-term memory processes in spatial habituation.

    Science.gov (United States)

    Sanderson, David J; Bannerman, David M

    2011-04-01

    Exposure to a spatial location leads to habituation of exploration such that, in a novelty preference test, rodents subsequently prefer exploring a novel location to the familiar location. According to Wagner's (1981) theory of memory, short-term and long-term habituation are caused by separate and sometimes opponent processes. In the present study, this dual-process account of memory was tested. Mice received a series of exposure training trials to a location before receiving a novelty preference test. The novelty preference was greater when tested after a short, rather than a long, interval. In contrast, the novelty preference was weaker when exposure training trials were separated by a short, rather than a long interval. Furthermore, it was found that long-term habituation was determined by the independent effects of the amount of exposure training and the number of exposure training trials when factors such as the intertrial interval and the cumulative intertrial interval were controlled. A final experiment demonstrated that a long-term reduction of exploration could be caused by a negative priming effect due to associations formed during exploration. These results provide evidence against a single-process account of habituation and suggest that spatial habituation is determined by both short-term, recency-based memory and long-term, incrementally strengthened memory.

  14. The Need for European Surveillance of CDI.

    Science.gov (United States)

    Wiuff, Camilla; Banks, A-Lan; Fitzpatrick, Fidelma; Cottom, Laura

    2018-01-01

    Since the turn of the millennium, the epidemiology of Clostridium difficile infection (CDI) has continued to challenge. Over the last decade there has been a growing awareness that improvements to surveillance are needed. The increasing rate of CDI and emergence of ribotype 027 precipitated the implementation of mandatory national surveillance of CDI in the UK. Changes in clinical presentation, severity of disease, descriptions of new risk factors and the occurrence of outbreaks all emphasised the importance of early diagnosis and surveillance.However a lack of consensus on case definitions, clinical guidelines and optimal laboratory diagnostics across Europe has lead to the underestimation of CDI and impeded comparison between countries. These inconsistencies have prevented the true burden of disease from being appreciated.Acceptance that a multi-country surveillance programme and optimised diagnostic strategies are required not only to detect and control CDI in Europe, but for a better understanding of the epidemiology, has built the foundations for a more robust, unified surveillance. The concerted efforts of the European Centre for Disease Prevention and Control (ECDC) CDI networks, has lead to the development of an over-arching long-term CDI surveillance strategy for 2014-2020. Fulfilment of the ECDC priorities and targets will no doubt be challenging and will require significant investment however the hope is that both a national and Europe-wide picture of CDI will finally be realised.

  15. Long-Term Monitoring of Utility-Scale Solar Energy Development and Application of Remote Sensing Technologies: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Hamada, Yuki [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division; Grippo, Mark A. [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division; Smith, Karen P. [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division

    2014-09-30

    In anticipation of increased utility-scale solar energy development over the next 20 to 50 years, federal agencies and other organizations have identified a need to develop comprehensive long-term monitoring programs specific to solar energy development. Increasingly, stakeholders are requesting that federal agencies, such as the U.S. Department of the Interior Bureau of Land Management (BLM), develop rigorous and comprehensive long-term monitoring programs. Argonne National Laboratory (Argonne) is assisting the BLM in developing an effective long-term monitoring plan as required by the BLM Solar Energy Program to study the environmental effects of solar energy development. The monitoring data can be used to protect land resources from harmful development practices while at the same time reducing restrictions on utility-scale solar energy development that are determined to be unnecessary. The development of a long-term monitoring plan that incorporates regional datasets, prioritizes requirements in the context of landscape-scale conditions and trends, and integrates cost-effective data collection methods (such as remote sensing technologies) will translate into lower monitoring costs and increased certainty for solar developers regarding requirements for developing projects on public lands. This outcome will support U.S. Department of Energy (DOE) Sunshot Program goals. For this reason, the DOE provided funding for the work presented in this report.

  16. Long-term volcanic hazard assessment on El Hierro (Canary Islands)

    Science.gov (United States)

    Becerril, L.; Bartolini, S.; Sobradelo, R.; Martí, J.; Morales, J. M.; Galindo, I.

    2014-07-01

    Long-term hazard assessment, one of the bastions of risk-mitigation programs, is required for land-use planning and for developing emergency plans. To ensure quality and representative results, long-term volcanic hazard assessment requires several sequential steps to be completed, which include the compilation of geological and volcanological information, the characterisation of past eruptions, spatial and temporal probabilistic studies, and the simulation of different eruptive scenarios. Despite being a densely populated active volcanic region that receives millions of visitors per year, no systematic hazard assessment has ever been conducted on the Canary Islands. In this paper we focus our attention on El Hierro, the youngest of the Canary Islands and the most recently affected by an eruption. We analyse the past eruptive activity to determine the spatial and temporal probability, and likely style of a future eruption on the island, i.e. the where, when and how. By studying the past eruptive behaviour of the island and assuming that future eruptive patterns will be similar, we aim to identify the most likely volcanic scenarios and corresponding hazards, which include lava flows, pyroclastic fallout and pyroclastic density currents (PDCs). Finally, we estimate their probability of occurrence. The end result, through the combination of the most probable scenarios (lava flows, pyroclastic density currents and ashfall), is the first qualitative integrated volcanic hazard map of the island.

  17. A vision of long-term care. To care for tomorrow's elderly, hospitals must plan now, not react later.

    Science.gov (United States)

    Kodner, D L

    1989-12-01

    In the next two decades, rapid, fundamental changes will take place in the way we finance, organize, and provide long-term care services. Because the elderly make up such a large portion of the patient population, America's hospitals should be concerned--and involved. There are six keys to the future of long-term care: a sharp increase in elderly population, a new generation of elderly, restrained government role, intergenerational strains, growing corporate concern, and the rise of "gerotechnology." These trends and countertrends will result in a new look in the long-term care landscape. By the year 2010, changes will include a true public-private financing system, provider reimbursement on the basis of capitation and prospective payment, coordinated access to services, dominant alternative delivery systems, a different breed of nursing homes, fewer staffing problems, patient-centered care, a new importance in housing, and an emphasis on prevention. For hospitals, this future vision of long-term care means that significant opportunities will open up to meet the needs of the elderly-at-risk and to achieve a competitive position in the burgeoning elderly care industry.

  18. How long is long-term? reflections based on over 20 years of post-Chernobyl management in Norway

    International Nuclear Information System (INIS)

    Liland, Astrid; Lochard, Jacques; Skuterud, Lavrans

    2009-01-01

    The radiation protection community has only recently started the important work of preparedness for long-term post-accidental management of radioactively contaminated areas, like for instance the EC projects STRATEGY, FARMING and EURANOS and the French authorities' CODIRPA and PAREX programmes. There are, however, different views concerning how long a long-term management might last. Based on the Norwegian and former Soviet Union experience after the Chernobyl accident, it is clear that a nuclear accident can entail decades of necessary management and rehabilitation of living conditions. The time period is dependent on a number of factors, e.g. amount of fallout, type of radionuclides, land use of contaminated area, number and density of people affected and available techniques and resources for implementing countermeasures. This paper discusses the management strategy implemented in Norway after the Chernobyl accident, the need for changing strategy over time and the important involvement of affected groups. Careful planning and reflections should be undertaken before actions are taken in the recovery phase, keeping in mind the possibility of decades with problems.

  19. How long is long-term? reflections based on over 20 years of post-Chernobyl management in Norway

    Energy Technology Data Exchange (ETDEWEB)

    Liland, Astrid [Norwegian Radiation Protection Authority, P.O. Box 55, 1332 Osteras (Norway)], E-mail: astrid.liland@nrpa.no; Lochard, Jacques [CEPN - Nuclear Protection Evaluation Centre, 28 rue de la Redoute, 92260 Fontenay-aux-Roses (France); Skuterud, Lavrans [Norwegian Radiation Protection Authority, P.O. Box 55, 1332 Osteras (Norway); Norwegian Reindeer Husbandry Authority, P.O. Box 121, 7361 Roros (Norway)

    2009-07-15

    The radiation protection community has only recently started the important work of preparedness for long-term post-accidental management of radioactively contaminated areas, like for instance the EC projects STRATEGY, FARMING and EURANOS and the French authorities' CODIRPA and PAREX programmes. There are, however, different views concerning how long a long-term management might last. Based on the Norwegian and former Soviet Union experience after the Chernobyl accident, it is clear that a nuclear accident can entail decades of necessary management and rehabilitation of living conditions. The time period is dependent on a number of factors, e.g. amount of fallout, type of radionuclides, land use of contaminated area, number and density of people affected and available techniques and resources for implementing countermeasures. This paper discusses the management strategy implemented in Norway after the Chernobyl accident, the need for changing strategy over time and the important involvement of affected groups. Careful planning and reflections should be undertaken before actions are taken in the recovery phase, keeping in mind the possibility of decades with problems.

  20. Long term liquidity analysis of the firm

    Directory of Open Access Journals (Sweden)

    Jaroslav Gonos

    2009-09-01

    Full Text Available Liquidity control is a very difficult and important function. If the business is not liquid in the long term, it is under threatof bankruptcy, and on the other hand surplus of the cash in hand threaten its future efficiency, because the cash in hand is a sourceof only limited profitability. Long term liquidity is related to the ability of the short term and long term liabilities payment. Articleis trying to point out to the monitoring and analyzing of the long term liquidity in the concrete business, in this case the printing industrycompany. Hereby at the end of the article mentioned monitored and analyzed liquidity is evaluated in the five years time period.

  1. Long-Term United Kindrom Trends in the Breeding Phenology of the Common Frog, Rana temporaria

    Czech Academy of Sciences Publication Activity Database

    Scott, W.A.; Pithart, David; Adamson, J. K.

    2008-01-01

    Roč. 42, č. 1 (2008), s. 89-96 ISSN 0022-1511 Institutional research plan: CEZ:AV0Z60870520 Keywords : Long-term * Common Frog * Breeding * Rana temporaria Subject RIV: EG - Zoology Impact factor: 0.888, year: 2008

  2. Possible Role of NPP in Long Term Low Carbon Development Strategy - Case Study Croatia

    International Nuclear Information System (INIS)

    Tomsic, Z.; Rajsl, I.; Filipovic, M.

    2016-01-01

    The term low - carbon development strategies (LEDS) was developed on the UN Framework Convention on Climate Change (UNFCCC) in 2008. LEDS used to describe a long-term national economic development plans or strategies that include low emissions and economic growth resistant to climate change. The concept of Low Carbon Development Strategies (LCDS) has been introduced by the Conference of Parties to the UNFCCC as a common but differentiated approach to meet the overall emissions reduction objectives: 'All countries shall prepare Low Emission Development Strategies - nationally-driven and represent[ing] the aims and objectives of individual Parties in accordance with national circumstances and capacities' (Cancun Agreement). Low Carbon Development Strategies (LCDS) in this way become an overarching framework to design and achieve Nationally Appropriate Mitigation Actions (NAMAs) reflecting the Common but Differentiated Responsibilities (CBDR) of all countries. For Long-Term National Strategy and Action Plan for Low-Carbon Development the main objective of this programme is the development of a long-term national strategy and action plan for low-carbon development to enable country to fulfil its commitment to carbon obligations. Low-carbon development strategy will become the fundamental for the development of the energy with low rate of carbon, but also for the entire economy. European Union is the leader in the effort to reduce emissions especially in the energy sector as the sector with the highest rate of emission. With the goal of reducing emissions, necessary measures are accentuated for energy in the EU Countries, as well as in Croatia. It will be presented the possibilities for realization of Croatian low-carbon development and particularly possible role and barriers for Nuclear power plants for Low carbon emissions development in the electricity sector until 2050. (author).

  3. Long-term Care Nurses' Communication Difficulties with People Living with Dementia in Taiwan

    Directory of Open Access Journals (Sweden)

    Jing-Jy Wang, PhD

    2013-09-01

    Conclusion: The results can serve as reference for planning dementia communication education for school curriculum to enhance student nurses' communication abilities and for junior nurses working in long-term or acute care settings to increase nurses' patient-centered communication abilities with the ultimate goal of improving quality of care for patients with dementia.

  4. Energy Systems Scenario Modelling and Long Term Forecasting of Hourly Electricity Demand

    DEFF Research Database (Denmark)

    Alberg Østergaard, Poul; Møller Andersen, Frits; Kwon, Pil Seok

    2015-01-01

    . The results show that even with a limited short term electric car fleet, these will have a significant effect on the energy system; the energy system’s ability to integrate wind power and the demand for condensing power generation capacity in the system. Charging patterns and flexibility have significant...... or inflexible electric vehicles and individual heat pumps, and in the long term it is investigated what the effects of changes in the load profiles due to changing weights of demand sectors are. The analyses are based on energy systems simulations using EnergyPLAN and demand forecasting using the Helena model...... effects on this. Likewise, individual heat pumps may affect the system operation if they are equipped with heat storages. The analyses also show that the long term changes in electricity demand curve profiles have little impact on the energy system performance. The flexibility given by heat pumps...

  5. Identification of liabilities and long-term management of the fund in Hungary

    International Nuclear Information System (INIS)

    Czoch, Ildiko

    2003-01-01

    According to the basic rules, laid down in the Act on Atomic Energy CXVI. of 1996, radioactive waste management shall not impose undue burden on future generations. To satisfy this requirement, the long-term costs of waste disposal and of decommissioning of the plant shall be paid by the generation that enjoys the benefits of nuclear energy production and applications of isotopes. Accordingly, by the Act and its executive orders, a Central Nuclear Financial Fund was established on 1 January 1998 to finance radioactive waste disposal, interim storage and disposal of spent fuel as well as decommissioning of nuclear facilities. The Minister, supervising the Hungarian Atomic Energy Authority is disposing of the Central Nuclear Financial Fund, while the Hungarian Atomic Energy Authority is responsible for its management. The Fund is a separate state fund pursuant to Act XXXVIII of 1992 on Public Finance, exclusively earmarked for financing the construction and operation of disposal facilities for the final disposal of radioactive waste, as well as for the interim storage and final disposal of spent fuel, and the decommissioning of nuclear facilities. A long-term plan (up to the decommissioning of the nuclear facilities), a medium term plan (for five years) and an annual work schedule are to be prepared on the use of the Fund. The preparation of these plans/schedules is within the responsibilities of the Public Agency for Radioactive Waste Management. The long and medium term plans shall be annually reviewed and revised as required. The long and medium term plans and the annual work schedule shall be approved by the Minister supervising the Hungarian Atomic Energy Authority. The payments into the Fund are defined in accordance with these plans. The liabilities of the Paks Nuclear Power Plant for annual payments into the Fund are included in the law on the central budget on the proposal of the Minister supervising the Hungarian Atomic Energy Authority. It is based upon

  6. Foresight of nuclear generation at long term in Mexico

    International Nuclear Information System (INIS)

    Guadarrama L, R.; Sanchez R, O. E.; Martin del Campo M, C.

    2009-10-01

    This paper presents an analysis of the nuclear generation expansion for the period 2008-2030. The main objective is to plan the expansion of electrical generation system at long term taking into account four decision criteria. These are, the total cost of generation, the risk associated whit changes in fuel prices, the diversity of the generation park and polluting emissions of global impact (greenhouse effect gases) and local effects (acid rain and suspended particles). The analyzed expansion plans were developed using a model of uni nodal planning called WASP-IV. The analysis methodology was based on four steps. The first consisted in developing, with model WASP-IV, different expansion plans of the electrical generation system that fulfill the energy demand and certain conditions of the study in which was optimized the additions program of generator units searching the minimal cost of electrical generation. The second step was to calculate the generation costs of each plan for two scenarios of fuel prices, also with model WASP-IV. Later was calculated the diversity index and the accumulated emissions during the expansion and the avoided emission of CO 2 when units of combined cycle that burn natural gas are replaced by nuclear power units. (Author)

  7. Devising an indicator to detect mid-term abortions in dairy cattle: a first step towards syndromic surveillance of abortive diseases.

    Directory of Open Access Journals (Sweden)

    Anne Bronner

    Full Text Available Bovine abortion surveillance is essential for human and animal health because it plays an important role in the early warning of several diseases. Due to the limited sensitivity of traditional surveillance systems, there is a growing interest for the development of syndromic surveillance. Our objective was to assess whether, routinely collected, artificial insemination (AI data could be used, as part of a syndromic surveillance system, to devise an indicator of mid-term abortions in dairy cattle herds in France. A mid-term abortion incidence rate (MAIR was computed as the ratio of the number of mid-term abortions to the number of female-weeks at risk. A mid-term abortion was defined as a return-to-service (i.e., a new AI taking place 90 to 180 days after the previous AI. Weekly variations in the MAIR in heifers and parous cows were modeled with a time-dependent Poisson model at the département level (French administrative division during the period of 2004 to 2010. The usefulness of monitoring this indicator to detect a disease-related increase in mid-term abortions was evaluated using data from the 2007-2008 episode of bluetongue serotype 8 (BT8 in France. An increase in the MAIR was identified in heifers and parous cows in 47% (n = 24 and 71% (n = 39 of the departements. On average, the weekly MAIR among heifers increased by 3.8% (min-max: 0.02-57.9% when the mean number of BT8 cases that occurred in the previous 8 to 13 weeks increased by one. The weekly MAIR among parous cows increased by 1.4% (0.01-8.5% when the mean number of BT8 cases occurring in the previous 6 to 12 weeks increased by one. These results underline the potential of the MAIR to identify an increase in mid-term abortions and suggest that it is a good candidate for the implementation of a syndromic surveillance system for bovine abortions.

  8. Devising an indicator to detect mid-term abortions in dairy cattle: a first step towards syndromic surveillance of abortive diseases.

    Science.gov (United States)

    Bronner, Anne; Morignat, Eric; Hénaux, Viviane; Madouasse, Aurélien; Gay, Emilie; Calavas, Didier

    2015-01-01

    Bovine abortion surveillance is essential for human and animal health because it plays an important role in the early warning of several diseases. Due to the limited sensitivity of traditional surveillance systems, there is a growing interest for the development of syndromic surveillance. Our objective was to assess whether, routinely collected, artificial insemination (AI) data could be used, as part of a syndromic surveillance system, to devise an indicator of mid-term abortions in dairy cattle herds in France. A mid-term abortion incidence rate (MAIR) was computed as the ratio of the number of mid-term abortions to the number of female-weeks at risk. A mid-term abortion was defined as a return-to-service (i.e., a new AI) taking place 90 to 180 days after the previous AI. Weekly variations in the MAIR in heifers and parous cows were modeled with a time-dependent Poisson model at the département level (French administrative division) during the period of 2004 to 2010. The usefulness of monitoring this indicator to detect a disease-related increase in mid-term abortions was evaluated using data from the 2007-2008 episode of bluetongue serotype 8 (BT8) in France. An increase in the MAIR was identified in heifers and parous cows in 47% (n = 24) and 71% (n = 39) of the departements. On average, the weekly MAIR among heifers increased by 3.8% (min-max: 0.02-57.9%) when the mean number of BT8 cases that occurred in the previous 8 to 13 weeks increased by one. The weekly MAIR among parous cows increased by 1.4% (0.01-8.5%) when the mean number of BT8 cases occurring in the previous 6 to 12 weeks increased by one. These results underline the potential of the MAIR to identify an increase in mid-term abortions and suggest that it is a good candidate for the implementation of a syndromic surveillance system for bovine abortions.

  9. Research on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal years 2010-2014

    International Nuclear Information System (INIS)

    Umeda, Koji; Ishimaru, Tsuneari; Yasue, Ken-ichi; Asamori, Koichi; Yamada, Kunimi; Saito-Kokubu, Yoko; Hanamuro, Takahiro; Tanikawa, Shin-ichi; Kusano, Tomohiro

    2010-09-01

    The concept of geological disposal of HLW in Japan is based on a multibarrier system which combines a stable geological environment with an engineered barrier system. Potential geological host formations and their surroundings are chosen, in particular, for their long-term stability, taking into account the fact that Japan is located in a tectonically active zone. This report is to outline 5 years plan (fiscal years 2010-2014) of research and development (R and D) for geosphere stability for long-term isolation of the high-level radioactive waste in JAEA. Background of this research are clarified with the necessity and the significance, and the past progresses in this report. The objectives, outline, contents and schedule during the next 5 years are described in detail. In addition, the plan framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  10. Long-term contracts vs. short-term trade of natural gas - a European perspective

    International Nuclear Information System (INIS)

    Neuhoff, Karsten; Hirschhausen, Christian von

    2005-01-01

    This paper analyses the economics of long-term gas contracts under changing institutional conditions, mainly gas sector liberalisation. The paper is motivated by the increasingly tense debate in continental Europe, UK and the US on the security of long-term gas supply. We discuss the main issues regarding long-term contracts, i.e. the changing role of the flexibility clause, the effect of abandoning the destination clause, and the strategic behaviour of producers between long-term sales and spot-sales. The literature suggests consumers and producers benefit from risk hedging through long-term contracts. Furthermore long-term contracts may reduce exercise of market power. Our analysis adds an additional benefit if the long-run demand elasticity is significantly lower than the short-run elasticity, both strategic producers and consumers benefit from lower prices and larger market volume. Some policy implications of the findings are also discussed. (Author)

  11. Long-term biodosimetry Redux

    International Nuclear Information System (INIS)

    Simon, Steven L.; Bouville, Andre

    2016-01-01

    This paper revisits and reiterates the needs, purposes and requirements of bio-dosimetric assays for long-term dose and health risk assessments. While the most crucial need for bio-dosimetric assays is to guide medical response for radiation accidents, the value of such techniques for improving our understanding of radiation health risk by supporting epidemiological (long-term health risk) studies is significant. As new cohorts of exposed persons are identified and new health risk studies are undertaken with the hopes that studying the exposed will result in a deeper understanding of radiation risk, the value of reliable dose reconstruction is underscored. The ultimate application of biodosimetry in long-term health risk studies would be to completely replace model-based dose reconstruction-a complex suite of methods for retrospectively estimating dose that is commonly fraught with large uncertainties due to the absence of important exposure-related information, as well as imperfect models. While biodosimetry could potentially supplant model-based doses, there are numerous limitations of presently available techniques that constrain their widespread application in health risk research, including limited ability to assess doses received far in the past, high cost, great inter-individual variability, invasiveness, higher than preferred detection limits and the inability to assess internal dose (for the most part). These limitations prevent the extensive application of biodosimetry to large cohorts and should be considered a challenge to researchers to develop new and more flexible techniques that meet the demands of long-term health risk research. Events in recent years, e.g. the Fukushima reactor accident and the increased threat of nuclear terrorism, underscore that any event that results in significant radiation exposures of a group of people will also produce a much larger population, exposed at lower levels, but that likewise needs (or demands) an exposure

  12. 10 CFR Appendix H to Part 50 - Reactor Vessel Material Surveillance Program Requirements

    Science.gov (United States)

    2010-01-01

    ... arrangement for data sharing between plants. d. There must be a contingency plan to assure that the... Requirements I. Introduction II. Definitions III. Surveillance Program Criteria IV. Report of Test Results I..., Rockville, MD 20852-2738. II. Definitions All terms used in this appendix have the same meaning as in...

  13. A Specific Long-Term Plan for Management of U.S. Nuclear Spent Fuel

    International Nuclear Information System (INIS)

    Levy, Salomon

    2006-01-01

    A specific plan consisting of six different steps is proposed to accelerate and improve the long-term management of U.S. Light Water Reactor (LWR) spent nuclear fuel. The first step is to construct additional, centralized, engineered (dry cask) spent fuel facilities to have a backup solution to Yucca Mountain (YM) delays or lack of capacity. The second step is to restart the development of the Integral Fast Reactor (IFR), in a burner mode, because of its inherent safety characteristics and its extensive past development in contrast to Acceleration Driven Systems (ADS). The IFR and an improved non-proliferation version of its pyro-processing technology can burn the plutonium (Pu) and minor actinides (MA) obtained by reprocessing LWR spent fuel. The remaining IFR and LWR fission products will be treated for storage at YM. The radiotoxicity of that high level waste (HLW) will fall below that of natural uranium in less than one thousand years. Due to anticipated increased capital, maintenance, and research costs for IFR, the third step is to reduce the required number of IFRs and their potential delays by implementing multiple recycles of Pu and Neptunium (Np) MA in LWR. That strategy is to use an advanced separation process, UREX+, and the MIX Pu option where the role and degradation of Pu is limited by uranium enrichment. UREX+ will decrease proliferation risks by avoiding Pu separation while the MIX fuel will lead to an equilibrium fuel recycle mode in LWR which will reduce U. S. Pu inventory and deliver much smaller volumes of less radioactive HLW to YM. In both steps two and three, Research and Development (R and D) is to emphasize the demonstration of multiple fuel reprocessing and fabrication, while improving HLW treatment, increasing proliferation resistance, and reducing losses of fissile material. The fourth step is to license and construct YM because it is needed for the disposal of defense wastes and the HLW to be generated under the proposed plan. The

  14. Long term radioactive waste management

    International Nuclear Information System (INIS)

    Lavie, J.M.

    1984-01-01

    In France, waste management, a sensitive issue in term of public opinion, is developing quickly, and due to twenty years of experience, is now reaching maturity. With the launching of the French nuclear programme, the use of radioactive sources in radiotherapy and industry, waste management has become an industrial activity. Waste management is an integrated system dealing with the wastes from their production to the long term disposal, including their identification, sortage, treatment, packaging, collection and transport. This system aims at guaranteing the protection of present and future populations with an available technology. In regard to their long term management, and the design of disposals, radioactive wastes are divided in three categories. This classification takes into account the different radioisotopes contained, their half life and their total activity. Presently short-lived wastes are stored in the shallowland disposal of the ''Centre de la Manche''. Set up within the French Atomic Energy Commission (CEA), the National Agency for waste management (ANDRA) is responsible within the framework of legislative and regulatory provisions for long term waste management in France [fr

  15. Modeling long-term dynamics of electricity markets

    International Nuclear Information System (INIS)

    Olsina, Fernando; Garces, Francisco; Haubrich, H.-J.

    2006-01-01

    In the last decade, many countries have restructured their electricity industries by introducing competition in their power generation sectors. Although some restructuring has been regarded as successful, the short experience accumulated with liberalized power markets does not allow making any founded assertion about their long-term behavior. Long-term prices and long-term supply reliability are now center of interest. This concerns firms considering investments in generation capacity and regulatory authorities interested in assuring the long-term supply adequacy and the stability of power markets. In order to gain significant insight into the long-term behavior of liberalized power markets, in this paper, a simulation model based on system dynamics is proposed and the underlying mathematical formulations extensively discussed. Unlike classical market models based on the assumption that market outcomes replicate the results of a centrally made optimization, the approach presented here focuses on replicating the system structure of power markets and the logic of relationships among system components in order to derive its dynamical response. The simulations suggest that there might be serious problems to adjust early enough the generation capacity necessary to maintain stable reserve margins, and consequently, stable long-term price levels. Because of feedback loops embedded in the structure of power markets and the existence of some time lags, the long-term market development might exhibit a quite volatile behavior. By varying some exogenous inputs, a sensitivity analysis is carried out to assess the influence of these factors on the long-run market dynamics

  16. Short-term memory and long-term memory are still different.

    Science.gov (United States)

    Norris, Dennis

    2017-09-01

    A commonly expressed view is that short-term memory (STM) is nothing more than activated long-term memory. If true, this would overturn a central tenet of cognitive psychology-the idea that there are functionally and neurobiologically distinct short- and long-term stores. Here I present an updated case for a separation between short- and long-term stores, focusing on the computational demands placed on any STM system. STM must support memory for previously unencountered information, the storage of multiple tokens of the same type, and variable binding. None of these can be achieved simply by activating long-term memory. For example, even a simple sequence of digits such as "1, 3, 1" where there are 2 tokens of the digit "1" cannot be stored in the correct order simply by activating the representations of the digits "1" and "3" in LTM. I also review recent neuroimaging data that has been presented as evidence that STM is activated LTM and show that these data are exactly what one would expect to see based on a conventional 2-store view. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  17. A blueprint for community benefit. A CHA-AAHA (Catholic Health Association-American Association of Homes for the Aging) document helps long-term care providers plan for and implement needed services.

    Science.gov (United States)

    Forschner, B; Trocchio, J

    1993-05-01

    A collaborative effort of the Catholic Health Association (CHA) and the American Association of Homes for the Aging, The Social Accountability Program: Continuing the Community Benefit Tradition of Not-for-Profit Homes and Services for the Aging helps long-term care organizations plan and report community benefit activities. The program takes long-term care providers through five sequential tasks: reaffirming commitment to the elderly and others in the community; developing a community service plan; developing and providing community services; reporting community services; and evaluating the community service role. To help organizations reaffirm commitment, the Social Accountability Program presents a process facilities can use to review their historical roots and purposes and evaluate whether current policies and procedures are consistent with the organizational philosophy. Once this step is completed, providers can develop a community service plan by identifying target populations and the services they need. For facilities developing and implementing such services, the program suggests ways of measuring and monitoring them for budgetary purposes. Once they have implemented services, not-for-profit healthcare organizations must account for their impact on the community. The Social Accountability Program lists elements to be included in community service reports. It also provides guidelines for evaluating these services' effectiveness and the organization's overall community benefit role.

  18. Short-Term and Working Memory Impairments in Early-Implanted, Long-Term Cochlear Implant Users Are Independent of Audibility and Speech Production.

    Science.gov (United States)

    AuBuchon, Angela M; Pisoni, David B; Kronenberger, William G

    2015-01-01

    To determine whether early-implanted, long-term cochlear implant (CI) users display delays in verbal short-term and working memory capacity when processes related to audibility and speech production are eliminated. Twenty-three long-term CI users and 23 normal-hearing controls each completed forward and backward digit span tasks under testing conditions that differed in presentation modality (auditory or visual) and response output (spoken recall or manual pointing). Normal-hearing controls reproduced more lists of digits than the CI users, even when the test items were presented visually and the responses were made manually via touchscreen response. Short-term and working memory delays observed in CI users are not due to greater demands from peripheral sensory processes such as audibility or from overt speech-motor planning and response output organization. Instead, CI users are less efficient at encoding and maintaining phonological representations in verbal short-term memory using phonological and linguistic strategies during memory tasks.

  19. The Application of Long Term Asset Management (LTAM) Strategy of KHNP

    International Nuclear Information System (INIS)

    Boo, Myung Hwan; Park, Young Sheop

    2007-01-01

    In KHNP, 20 units of Nuclear Power Plants (NPP) are operating and 6 units are under construction. As increase of the number of power plants and operating year, it is needed to develop the integrated cost-effective asset management. Long Term Asset Management (LTAM) strategy is the process by which the nuclear power plants integrate operations, maintenance, engineering, regulatory, and economic planning activities. This paper introduces the application of LTAM strategy of nuclear power plants

  20. Discharge-planning for long-term care needs: the values and priorities of older people, their younger relatives and health professionals.

    Science.gov (United States)

    Denson, Linley A; Winefield, Helen R; Beilby, Justin J

    2013-03-01

    Discharge-planning decisions about long-term care (LTC) can be difficult and distressing for older people, families and discharge-planning health professionals. Retrospective research suggests that despite good intentions and a shared focus on the best interests of the older person, stakeholders may hold very different values about good outcomes and how to decide them. We aimed to compare the opinions and values of frail elders living at home, younger relatives and health professionals experienced in discharge-planning, prospectively: before, not after, a LTC decision. We interviewed three types of stakeholders (10 older people, 8 relatives and 18 health professionals) using a hypothetical vignette about a frail elder leaving hospital. In a mixed methods design, we quantitatively compared the discharge plans and decision-makers that stakeholders suggested, and qualitatively analysed the 36 interview transcripts for participants' articulation of underlying values during these discussions. Older participants often suggested safe restrictive options (residential care, proxy decision-making) for the hypothetical frail elder, while advocating autonomy for themselves. Younger people generally endorsed autonomous decision-making and less restrictive discharge options especially if the elder was mentally competent, but reported difficult ethical tensions between safety and autonomy. Individual personality and preferences, mental capacity, and the importance of personal care in supporting autonomy were central themes consistent with the Ecological Theory of Aging. Accordingly, discharge planners can usefully articulate the balance of safety and autonomy, conceptualizing home care as maintaining independence rather than accepting dependence. Ethical training should incorporate sophisticated models of practice specifying both psychological and physical safety as components of beneficence. Few elders adopt a consumer approach to LTC: health professionals can encourage mid

  1. Long-Term Collections

    CERN Multimedia

    Comité des collectes à long terme

    2011-01-01

    It is the time of the year when our fireman colleagues go around the laboratory for their traditional calendars sale. A part of the money of the sales will be donated in favour of the long-term collections. We hope that you will welcome them warmly.

  2. Looking Ahead: The Inclusion of Long-Term Futures in Cumulative Environmental Assessments

    International Nuclear Information System (INIS)

    Munn, R.E.

    1994-01-01

    Proceeding of a workshop on the Inclusion of Long-Term Futures in Cumulative Environmental Assessments (CEA's) were presented.. Also included were three working group reports and papers presented at the conference. The issue of the concept of Cumulative Environmental Assessments was summarized, along with the current transformation to a more global outlook. The concepts and methodological questions associated with ecology and economics were tackled. CEA methods were discussed and a contrast was made with land-use planning. The importance of long-term monitoring programs was introduced and examples of early warning systems were given. Social science issues behind CEAs were also discussed. Recommendation e for preparing CEA's, the design of early warning monitoring systems, and public involvement, were made.. Contributed papers covered topics related to environmental assessment, pollution, and climate change

  3. Risk evaluation of cosmic-ray exposure in long-term manned space mission

    International Nuclear Information System (INIS)

    Fujitaka, Kazunobu; Majima, Hideyuki; Ando, Koichi; Yasuda, Hiroshi; Suzuki, Masao

    1999-03-01

    Long-term manned space missions are planned to be implemented within the first two decades of the 21st century. The International Space Station (ISS) will be ready to run, and a plan to visit Mars is also under way. Humans will live in space for long periods of time and we are planning to do experiments in space to examine various aspects of space science. The main risk in long-term manned space missions is large exposure to space radiation. Human safety must be ensured in space where exposure to cosmic rays is almost 1 mSv a day. As such missions will inevitably result in significant exposure for astronauts, there is increasing need to protect them adequately based on both physical and biological knowledge. A good method to evaluate realistic risk associated with space missions will be in urgent demand. At the National Institute of Radiological Sciences (NIRS), Chiba, Japan, a research institutes of the Science Technology Agency of Japan, high energy cosmic radiation can be simulated only with heavy ion irradiation accelerated by the particle accelerator, Heavy Ion Medical Accelerator (HIMAC). Research to evaluate risk of space radiation, including physical measurement techniques, protective effects, biological effects and risk adjustment, aging, neuronal cell damage and cancer risk are undergoing. We organized a workshop of the latest topics and experimental results of physics and biology related to space radiation supported by Japan Science and Technology Corporation (JST). This workshop was held as a satellite meeting associated with the 32nd Committee on Space Research (COSPAR) Scientific Assembly (Nagoya, July 12-19th, 1998). This volume is an extended proceedings of the workshop. The proceedings contain six main subjects covering the latest information on Risk Evaluation of Cosmic-Ray Exposure in Long-Term Manned Space Mission'. 1. Risk Estimation of Heavy Ion Exposure in Space. 2. Low Dose-Rate Effects and Microbeam-Related Heavy Ions. 3. Chromosome and

  4. Long-Term Memory Performance in Adult ADHD.

    Science.gov (United States)

    Skodzik, Timo; Holling, Heinz; Pedersen, Anya

    2017-02-01

    Memory problems are a frequently reported symptom in adult ADHD, and it is well-documented that adults with ADHD perform poorly on long-term memory tests. However, the cause of this effect is still controversial. The present meta-analysis examined underlying mechanisms that may lead to long-term memory impairments in adult ADHD. We performed separate meta-analyses of measures of memory acquisition and long-term memory using both verbal and visual memory tests. In addition, the influence of potential moderator variables was examined. Adults with ADHD performed significantly worse than controls on verbal but not on visual long-term memory and memory acquisition subtests. The long-term memory deficit was strongly statistically related to the memory acquisition deficit. In contrast, no retrieval problems were observable. Our results suggest that memory deficits in adult ADHD reflect a learning deficit induced at the stage of encoding. Implications for clinical and research settings are presented.

  5. Long-term air temperature changes in a Central European sedge-grass marsh

    Czech Academy of Sciences Publication Activity Database

    Dušek, Jiří; Stellner, Stanislav; Komárek, A.

    2013-01-01

    Roč. 6, č. 2 (2013), s. 182-190 ISSN 1936-0584 R&D Projects: GA MŠk(CZ) ED1.1.00/02.0073; GA MŽP(CZ) SP/2D1/93/07 Institutional research plan: CEZ:AV0Z60870520 Keywords : Carex acuta * fen * wetland * long-term monitoring * global change Subject RIV: EH - Ecology, Behaviour Impact factor: 2.634, year: 2013

  6. Hanford grout: predicting long-term performance

    International Nuclear Information System (INIS)

    Sewart, G.H.; Mitchell, D.H.; Treat, R.L.; McMakin, A.H.

    1987-01-01

    Grouted disposal is being planned for the low-level portion of liquid radioactive wastes at the Hanford site in Washington state. The performance of the disposal system must be such that it will protect people and the environment for thousands of years after disposal. To predict whether a specific grout disposal system will comply with existing and foreseen regulations, a performance assessment (PA) is performed. Long-term PAs are conducted for a range of performance conditions. Performance assessment is an inexact science. Quantifying projected impacts is especially difficult when only scant data exist on the behavior of certain components of the disposal system over thousands of years. To develop defensible results, we are honing the models and obtaining experimental data. The combination of engineered features and PA refinements is being used to ensure that Hanford grout will meet its principal goal: to protect people and the environment in the future

  7. Researched solutions for long-term accommodation units for drug-resistant tuberculosis patients in South Africa

    CSIR Research Space (South Africa)

    Parsons, S

    2010-09-01

    Full Text Available H and provincial recipients for the planning, design and construction of the units as well as to manage project implementation. The project has provided a unique opportunity to review current policy, to develop guidelines for long-term accommodation of patients...

  8. Virtual Models of Long-Term Care

    Science.gov (United States)

    Phenice, Lillian A.; Griffore, Robert J.

    2012-01-01

    Nursing homes, assisted living facilities and home-care organizations, use web sites to describe their services to potential consumers. This virtual ethnographic study developed models representing how potential consumers may understand this information using data from web sites of 69 long-term-care providers. The content of long-term-care web…

  9. Sleep facilitates long-term face adaptation

    OpenAIRE

    Ditye, Thomas; Javadi, Amir Homayoun; Carbon, Claus-Christian; Walsh, Vincent

    2013-01-01

    Adaptation is an automatic neural mechanism supporting the optimization of visual processing on the basis of previous experiences. While the short-term effects of adaptation on behaviour and physiology have been studied extensively, perceptual long-term changes associated with adaptation are still poorly understood. Here, we show that the integration of adaptation-dependent long-term shifts in neural function is facilitated by sleep. Perceptual shifts induced by adaptation to a distorted imag...

  10. Prevalence of Long-Term Opioid Use in Long-Stay Nursing Home Residents.

    Science.gov (United States)

    Hunnicutt, Jacob N; Chrysanthopoulou, Stavroula A; Ulbricht, Christine M; Hume, Anne L; Tjia, Jennifer; Lapane, Kate L

    2018-01-01

    Overall and long-term opioid use among older adults have increased since 1999. Less is known about opioid use in older adults in nursing homes (NHs). Cross-sectional. U.S. NHs (N = 13,522). Long-stay NH resident Medicare beneficiaries with a Minimum Data Set 3.0 (MDS) assessment between April 1, 2012, and June 30, 2012, and 120 days of follow-up (N = 315,949). We used Medicare Part D claims to measure length of opioid use in the 120 days from the index assessment (short-term: ≤30 days, medium-term: >30-89 days, long-term: ≥90 days), adjuvants (e.g., anticonvulsants), and other pain medications (e.g., corticosteroids). MDS assessments in the follow-up period were used to measure nonpharmacological pain management use. Modified Poisson models were used to estimate adjusted prevalence ratios (aPR) and 95% confidence intervals (CI) for age, gender, race and ethnicity, cognitive and physical impairment, and long-term opioid use. Of all long-stay residents, 32.4% were prescribed any opioid, and 15.5% were prescribed opioids long-term. Opioid users (versus nonusers) were more commonly prescribed pain adjuvants (32.9% vs 14.9%), other pain medications (25.5% vs 11.0%), and nonpharmacological pain management (24.5% vs 9.3%). Long-term opioid use was higher in women (aPR = 1.21, 95% CI = 1.18-1.23) and lower in racial and ethnic minorities (non-Hispanic blacks vs whites: APR = 0.93, 95% CI = 0.90-0.94) and those with severe cognitive impairment (vs no or mild impairment, aPR = 0.82, 95% CI = 0.79-0.83). One in seven NH residents was prescribed opioids long-term. Recent guidelines on opioid prescribing for pain recommend reducing long-term opioid use, but this is challenging in NHs because residents may not benefit from nonpharmacological and nonopioid interventions. Studies to address concerns about opioid safety and effectiveness (e.g., on pain and functional status) in NHs are needed. © 2017, Copyright the Authors Journal compilation © 2017, The American Geriatrics

  11. Analysis of the immune system of multiple myeloma patients achieving long-term disease control by multidimensional flow cytometry

    Science.gov (United States)

    Pessoa de Magalhães, Roberto J.; Vidriales, María-Belén; Paiva, Bruno; Fernandez-Gimenez, Carlos; García-Sanz, Ramón; Mateos, Maria-Victoria; Gutierrez, Norma C.; Lecrevisse, Quentin; Blanco, Juan F; Hernández, Jose; de las Heras, Natalia; Martinez-Lopez, Joaquin; Roig, Monica; Costa, Elaine Sobral; Ocio, Enrique M.; Perez-Andres, Martin; Maiolino, Angelo; Nucci, Marcio; De La Rubia, Javier; Lahuerta, Juan-Jose; San-Miguel, Jesús F.; Orfao, Alberto

    2013-01-01

    Multiple myeloma remains largely incurable. However, a few patients experience more than 10 years of relapse-free survival and can be considered as operationally cured. Interestingly, long-term disease control in multiple myeloma is not restricted to patients with a complete response, since some patients revert to having a profile of monoclonal gammopathy of undetermined significance. We compared the distribution of multiple compartments of lymphocytes and dendritic cells in the bone marrow and peripheral blood of multiple myeloma patients with long-term disease control (n=28), patients with newly diagnosed monoclonal gammopathy of undetermined significance (n=23), patients with symptomatic multiple myeloma (n=23), and age-matched healthy adults (n=10). Similarly to the patients with monoclonal gammopathy of undetermined significance and symptomatic multiple myeloma, patients with long-term disease control showed an expansion of cytotoxic CD8+ T cells and natural killer cells. However, the numbers of bone marrow T-regulatory cells were lower in patients with long-term disease control than in those with symptomatic multiple myeloma. It is noteworthy that B cells were depleted in patients with monoclonal gammopathy of undetermined significance and in those with symptomatic multiple myeloma, but recovered in both the bone marrow and peripheral blood of patients with long-term disease control, due to an increase in normal bone marrow B-cell precursors and plasma cells, as well as pre-germinal center peripheral blood B cells. The number of bone marrow dendritic cells and tissue macrophages differed significantly between patients with long-term disease control and those with symptomatic multiple myeloma, with a trend to cell count recovering in the former group of patients towards levels similar to those found in healthy adults. In summary, our results indicate that multiple myeloma patients with long-term disease control have a constellation of unique immune changes

  12. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  13. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  14. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  15. The out-of-focus bias in drug surveillance.

    Science.gov (United States)

    Gnädinger, Markus; Mellinghoff, Hans-Ulrich

    2013-03-01

    Existing drug safety systems with phase II and III studies and post-marketing surveillance by principle do not allow for the recognition of an important class of adverse drug reactions (ADRs). ADRs that are resistant to being detected reliably may a) appear as if they are age-related chronic diseases, which also manifest themselves in a high degree without drug treatment, b) arise in "old" drugs, c) arise during long-term application, and d) arise with the administration to frail and aged populations. "Silent" and multi-factorial health problems evolving from long-term drug treatment must therefore be addressed with a systematic search strategy, as a third track along with the phase II and III studies and spontaneous reporting systems which still exist.

  16. 75 FR 65282 - Medicare and Medicaid Programs; Requirements for Long Term Care Facilities; Hospice Services

    Science.gov (United States)

    2010-10-22

    .... Palliative care in an LTC facility involves addressing physical, intellectual, emotional, social, and... Disability, Aging and Long-Term Care Policy and the Urban Institute; ``Synthesis and Analysis of Medicare..., mental, social, or emotional status; clinical complications that suggested a need to alter the care plan...

  17. Long-Term Prognosis of Plantar Fasciitis

    DEFF Research Database (Denmark)

    Hansen, Liselotte; Krogh, Thøger Persson; Ellingsen, Torkell

    2018-01-01

    , exercise-induced symptoms, bilateral heel pain, fascia thickness, and presence of a heel spur) could predict long-term outcomes, (3) to assess the long-term ultrasound (US) development in the fascia, and (4) to assess whether US-guided corticosteroid injections induce atrophy of the heel fat pad. Study....... The risk was significantly greater for women (P heel...... regardless of symptoms and had no impact on prognosis, and neither did the presence of a heel spur. Only 24% of asymptomatic patients had a normal fascia on US at long-term follow-up. A US-guided corticosteroid injection did not cause atrophy of the heel fat pad. Our observational study did not allow us...

  18. Long-term dependence in exchange rates

    Directory of Open Access Journals (Sweden)

    A. Karytinos

    2000-01-01

    Full Text Available The extent to which exchange rates of four major currencies against the Greek Drachma exhibit long-term dependence is investigated using a R/S analysis testing framework. We show that both classic R/S analysis and the modified R/S statistic if enhanced by bootstrapping techniques can be proven very reliable tools to this end. Our findings support persistence and long-term dependence with non-periodic cycles for the Deutsche Mark and the French Franc series. In addition a noisy chaos explanation is favored over fractional Brownian motion. On the contrary, the US Dollar and British Pound were found to exhibit a much more random behavior and lack of any long-term structure.

  19. Short-term versus long-term contracting for uranium enrichment services

    International Nuclear Information System (INIS)

    Rudy, G.P.

    1990-01-01

    The US Department of Energy (US DOE) is the world's largest and most experienced supplier of uranium enrichment services. Through the late 1970s and early 1980s, emerging market forces transformed what was once a monopoly into a highly competitive industry. In the early 1980's the DOE lost market share. But as we enter the 1990s, new market forces have emerged. The US DOE believes a responsible balance between long-term and short-term contracting will be the key to success and the key to assuring the long-term health and reliability of the nuclear fuel industry. The US DOE intends to be in this nuclear business for a long time and will continue to offer reliable and responsive services second to none

  20. Energy systems scenario modelling and long term forecasting of hourly electricity demand

    Directory of Open Access Journals (Sweden)

    Poul Alberg Østergaard

    2015-06-01

    Full Text Available The Danish energy system is undergoing a transition from a system based on storable fossil fuels to a system based on fluctuating renewable energy sources. At the same time, more of and more of the energy system is becoming electrified; transportation, heating and fuel usage in industry and elsewhere. This article investigates the development of the Danish energy system in a medium year 2030 situation as well as in a long-term year 2050 situation. The analyses are based on scenario development by the Danish Climate Commission. In the short term, it is investigated what the effects will be of having flexible or inflexible electric vehicles and individual heat pumps, and in the long term it is investigated what the effects of changes in the load profiles due to changing weights of demand sectors are. The analyses are based on energy systems simulations using EnergyPLAN and demand forecasting using the Helena model. The results show that even with a limited short-term electric car fleet, these will have a significant effect on the energy system; the energy system’s ability to integrated wind power and the demand for condensing power generation capacity in the system. Charging patterns and flexibility have significant effects on this. Likewise, individual heat pumps may affect the system operation if they are equipped with heat storages. The analyses also show that the long-term changes in electricity demand curve profiles have little impact on the energy system performance. The flexibility given by heat pumps and electric vehicles in the long-term future overshadows any effects of changes in hourly demand curve profiles.

  1. Ontario's long-term energy plan, building our clean energy future

    International Nuclear Information System (INIS)

    2010-01-01

    The first energy priority of the plan is to provide all Ontarians with a clean, modern and reliable electricity system. It gives a summary of the means implemented to help families and businesses with increasing electricity costs. The plan is to shift the province from a coal-dependent system. Over the next 20 years, 15,000 MW (megawatt) of generating capacity will have to be rebuilt or constructed to replace older Ontario's energy infrastructures. In Ontario, an increase of about 3.5% per year in residential prices, resulting from the need to enjoy clean air, reliable generation and modernized transmission, is expected to occur over the next two decades. The expected electricity needs in Ontario and efficient means to satisfy them are described in this plan.

  2. National Energy Plan 2030: a proposal for power generation expansion in the long term; Plano Nacional de Energia 2030: uma proposta de expansao para a geracao de energia eletrica no longo prazo

    Energy Technology Data Exchange (ETDEWEB)

    Guerreiro, Amilcar Goncalves; Pereira Junior, Amaro Olimpio; Lopes, Juarez Castrillon; Tavares, Marina Elisabete E.; Silva, Renata de A.M. da; Queiroz, Renato P.; Oliveira, Ricardo G. de [Empresa de Pesquisa Energetica (EPE), Brasilia, DF (Brazil)

    2008-07-01

    The article aims to present and discuss a proposal for electric energy expansion generation capacity in long term. This work identifies the most appropriate evolution of the hydrothermal mix for the expansion of the supply of electrical power in the country, over the horizon of planning by 2030. (author)

  3. Long-Term Dynamics of Autonomous Fractional Differential Equations

    Science.gov (United States)

    Liu, Tao; Xu, Wei; Xu, Yong; Han, Qun

    This paper aims to investigate long-term dynamic behaviors of autonomous fractional differential equations with effective numerical method. The long-term dynamic behaviors predict where systems are heading after long-term evolution. We make some modification and transplant cell mapping methods to autonomous fractional differential equations. The mapping time duration of cell mapping is enlarged to deal with the long memory effect. Three illustrative examples, i.e. fractional Lotka-Volterra equation, fractional van der Pol oscillator and fractional Duffing equation, are studied with our revised generalized cell mapping method. We obtain long-term dynamics, such as attractors, basins of attraction, and saddles. Compared with some existing stability and numerical results, the validity of our method is verified. Furthermore, we find that the fractional order has its effect on the long-term dynamics of autonomous fractional differential equations.

  4. The connection between long-term and short-term risk management strategies for flood and landslide hazards: examples from land-use planning and emergency management in four European case studies

    Science.gov (United States)

    Prenger-Berninghoff, K.; Cortes, V. J.; Sprague, T.; Aye, Z. C.; Greiving, S.; Głowacki, W.; Sterlacchini, S.

    2014-12-01

    Adaptation to complex and unforeseen events requires enhancing the links between planning and preparedness phases to reduce future risks in the most efficient way. In this context, the legal-administrative and cultural context has to be taken into account. This is why four case study areas of the CHANGES1 project (Nehoiu Valley in Romania, Ubaye Valley in France, Val Canale in Italy, and Wieprzówka catchment in Poland) serve as examples to highlight currently implemented risk management strategies for land-use planning and emergency preparedness. The focus is particularly on flood and landslide hazards. The strategies described in this paper were identified by means of exploratory and informal interviews in each study site. Results reveal that a dearth or, in very few cases, a weak link exists between spatial planners and emergency managers. Management strategies could benefit from formally intensifying coordination and cooperation between emergency services and spatial planning authorities. Moreover, limited financial funds urge for a more efficient use of resources and better coordination towards long-term activities. The research indicates potential benefits to establishing or, in some cases, strengthening this link through contextual changes, e.g., in organizational or administrative structures, that facilitate proper interaction between risk management and spatial planning. It also provides suggestions for further development in the form of information and decision support systems as a key connection point. 1 Marie Curie ITN CHANGES - Changing Hydro-meteorological Risks as Analyzed by a New Generation of European Scientists

  5. Current prevention and control of health care-associated infections in long-term care facilities for the elderly in Japan.

    Science.gov (United States)

    Kariya, Naoko; Sakon, Naomi; Komano, Jun; Tomono, Kazunori; Iso, Hiroyasu

    2018-05-01

    Residents of long-term care facilities for the elderly are vulnerable to health care-associated infections. However, compared to medical institutions, long-term care facilities for the elderly lag behind in health care-associated infection control and prevention. We conducted a epidemiologic study to clarify the current status of infection control in long-term care facilities for the elderly in Japan. A questionnaire survey on the aspects of infection prevention and control was developed according to SHEA/APIC guidelines and was distributed to 617 long-term care facilities for the elderly in the province of Osaka during November 2016 and January 2017. The response rate was 16.9%. The incidence rates of health care-associated infection outbreaks and residents with health care-associated infections were 23.4 per 100 facility-years and 0.18 per 1,000 resident-days, respectively. Influenza and acute gastroenteritis were reported most frequently. Active surveillance to identify the carrier of multiple drug-resistant organisms was not common. The overall compliance with 21 items selected from the SHEA/APIC guidelines was approximately 79.2%. All facilities had infection control manuals and an assigned infection control professional. The economic burdens of infection control were approximately US$ 182.6 per resident-year during fiscal year 2015. Importantly, these data implied that physicians and nurses were actively contributed to higher SHEA/APIC guideline compliance rates and the advancement of infection control measures in long-term care facilities for the elderly. Key factors are discussed to further improve the infection control in long-term care facilities for the elderly, particularly from economic and social structural standpoints. Copyright © 2017 Japanese Society of Chemotherapy and The Japanese Association for Infectious Diseases. Published by Elsevier Ltd. All rights reserved.

  6. The Womanly World of Long Term Care: The Plight of the Long Term Care Worker. Gray Paper.

    Science.gov (United States)

    Older Women's League, Washington, DC.

    Long-term care workers (those who are paid to provide custodial care for long-term patients in nursing homes or at home) must care for a growing number of increasingly disabled or dependent persons. They are working for agencies and institutions under growing pressure to increase productivity. They face new training and competency requirements,…

  7. Determinants of long-term outcome in patients undergoing simultaneous resection of synchronous colorectal liver metastases.

    Directory of Open Access Journals (Sweden)

    Qi Lin

    Full Text Available BACKGROUND: It remains unclear which patients can benefit from simultaneous resection of synchronous colorectal liver metastases (SCRLMs. This study aimed to examine the prognostic value of patient- and tumor-related factors in predicting long-term outcomes of patients undergoing simultaneous resection of SCRLMs and to help patients select a suitable therapeutic regimen and proper surveillance. METHODS: Clinicopathological and outcome data of 154 consecutive SCRLM patients who underwent simultaneous resection between July 2003 and July 2013 were collected from our prospectively established SCRLM data and analyzed with univariate and multivariate methods, and the prognostic index (PI was formulated based on the regression coefficients (β of the Cox model. The patients were classified into high- and low-risk groups according to the PI value; the cut-off point was the third quartile. RESULTS: The 5-year overall survival rate was 46%, and the 5-year disease-free survival rate was 35%. Five factors were found to be independent predictors of poor overall survival (OS by multivariate analysis: positive lymph node status, vascular invasion, BRAF mutation, the distribution of bilobar liver metastases (LMs and non-R0 resection of LMs. Compared to low PI (≤5.978, high PI (>5.978 was highly predictive of shorter OS. Three factors were found to be independent predictors of poor disease-free survival (DFS by multivariate analysis: tumor deposits, BRAF mutation and bilobar LM distribution. We also determined the PI for DFS. Compared to low PI (≤2.945, high PI (>2.945 was highly predictive of shorter DFS. CONCLUSIONS: Simultaneous resection of SCRLM may lead to various long-term outcomes. Patients with low PI have longer OS and DFS, while those with high PI have shorter OS and DFS. Thus, patients with high PI may receive more aggressive treatment and intensive surveillance, This model needs further validation.

  8. Inventory of surveillance systems assessing dietary, physical activity and sedentary behaviours in Europe: a DEDIPAC study.

    NARCIS (Netherlands)

    Bel-Serrat, Silvia; Huybrechts, Inge; Thumann, Barbara F; Hebestreit, Antje; Abuja, Peter M; de Henauw, Stefaan; Dubuisson, Carine; Heuer, Thorsten; Murrin, Celine M; Lazzeri, Giacomo; van Rossum, Caroline; Andersen, Lene F; Szeklicki, Robert; Vioque, Jesús; Berry, Rachel; van der Ploeg, Hidde P; Ahrens, Wolfgang; Slimani, Nadia

    2017-01-01

    There is a need for harmonized public health surveillance systems to monitor regional variations and temporal trends of health behaviours and health outcomes and to align policies, action plans and recommendations in terms of healthy diet and physical (in)activity within Europe. We provide an

  9. Collaboration in long-term stewardship at DOE Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Moren, R. J.; Zeisloft, J. H.; Feist, E. T.; Brown, D.; Grindstaff, K. D.

    2013-01-10

    The U.S. Department of Energy's (DOE) Hanford Site comprises approximately 1,517 km{sup 2} (586 mi{sup 2}) of land in southeastern Washington. The site was established in 1943 as part of the Manhattan Project to produce plutonium for the nation's nuclear weapons program. As the Cold War era came to an end, the mission of the site transitioned from weapons production to environmental cleanup. As the River Corridor area of the site cleanup is completed, the mission for that portion of the site will transition from active cleanup to continued protection of environment through the Long-Term Stewardship (LTS) Program. The key to successful transition from cleanup to LTS is the unique collaboration among three (3) different DOE Programs and three (3) different prime contractors with each contractor having different contracts. The LTS Program at the site is a successful model of collaboration resulting in efficient resolution of issues and accelerated progress that supports DOE's Richland Office 2015 Vision for the Hanford Site. The 2015 Vision for the Hanford Site involves shrinking the active cleanup footprint of the surface area of the site to approximately 20 mi{sup 2} on the Central Plateau. Hanford's LTS Program is defined in DOE's planning document, Hanford Long-Term Stewardship Program Plan, DOE/RL-2010-35 Rev 1. The Plan defines the relationship and respective responsibilities between the federal cleanup projects and the LTS Program along with their respective contractors. The LTS Program involves these different parties (cleanup program and contractors) who must work together to achieve the objective for transition of land parcels. Through the collaborative efforts with the prime contractors on site over the past two years, 253.8 km{sup 2} (98 mi{sup 2}) of property has been successfully transitioned from the cleanup program to the LTS Program upon completion of active surface cleanup. Upcoming efforts in the near term will include transitioning another large

  10. Long term wet spent nuclear fuel storage

    International Nuclear Information System (INIS)

    1987-04-01

    The meeting showed that there is continuing confidence in the use of wet storage for spent nuclear fuel and that long-term wet storage of fuel clad in zirconium alloys can be readily achieved. The importance of maintaining good water chemistry has been identified. The long-term wet storage behaviour of sensitized stainless steel clad fuel involves, as yet, some uncertainties. However, great reliance will be placed on long-term wet storage of spent fuel into the future. The following topics were treated to some extent: Oxidation of the external surface of fuel clad, rod consolidation, radiation protection, optimum methods of treating spent fuel storage water, physical radiation effects, and the behaviour of spent fuel assemblies of long-term wet storage conditions. A number of papers on national experience are included

  11. Long-Term Collections

    CERN Multimedia

    Staff Association

    2016-01-01

    45 years helping in developing countries! CERN personnel have been helping the least fortunate people on the planet since 1971. How? With the Long-Term Collections! Dear Colleagues, The Staff Association’s Long-Term Collections (LTC) Committee is delighted to share this important milestone in the life of our Laboratory with you. Indeed, whilst the name of CERN is known worldwide for scientific discoveries, it also shines in the many humanitarian projects which have been supported by the LTC since 1971. Several schools and clinics, far and wide, carry its logo... Over the past 45 years, 74 projects have been supported (9 of which are still ongoing). This all came from a group of colleagues who wanted to share a little of what life offered them here at CERN, in this haven of mutual understanding, peace and security, with those who were less fortunate elsewhere. Thus, the LTC were born... Since then, we have worked as a team to maintain the dream of these visionaries, with the help of regular donat...

  12. Long-Term Collection

    CERN Multimedia

    Staff Association

    2016-01-01

    Dear Colleagues, As previously announced in Echo (No. 254), your delegates took action to draw attention to the projects of the Long-Term Collections (LTC), the humanitarian body of the CERN Staff Association. On Tuesday, 11 October, at noon, small Z-Cards were widely distributed at the entrances of CERN restaurants and we thank you all for your interest. We hope to have achieved an important part of our goal, which was to inform you, convince you and find new supporters among you. We will find out in the next few days! An exhibition of the LTC was also set up in the Main Building for the entire week. The Staff Association wants to celebrate the occasion of the Long-Term Collection’s 45th anniversary at CERN because, ever since 1971, CERN personnel have showed great support in helping the least fortunate people on the planet in a variety of ways according to their needs. On a regular basis, joint fundraising appeals are made with the Directorate to help the victims of natural disasters around th...

  13. The third stage of hospital long-range planning: the marketing approach.

    Science.gov (United States)

    Rynne, T J

    1980-01-01

    Today most hospital administrators are convinced they should implement long-range planning. The marketing approach to long-range planning is an effective strategy that is consumer oriented. It starts the planning process with the consumer, letting the consumer's needs and wants guide the organization's planning.

  14. Predicting Discharge to Institutional Long-Term Care After Stroke: A Systematic Review and Metaanalysis.

    Science.gov (United States)

    Burton, Jennifer K; Ferguson, Eilidh E C; Barugh, Amanda J; Walesby, Katherine E; MacLullich, Alasdair M J; Shenkin, Susan D; Quinn, Terry J

    2018-01-01

    Stroke is a leading cause of disability worldwide, and a significant proportion of stroke survivors require long-term institutional care. Understanding who cannot be discharged home is important for health and social care planning. Our aim was to establish predictive factors for discharge to institutional care after hospitalization for stroke. We registered and conducted a systematic review and meta-analysis (PROSPERO: CRD42015023497) of observational studies. We searched MEDLINE, EMBASE, and CINAHL Plus to February 2017. Quantitative synthesis was performed where data allowed. Acute and rehabilitation hospitals. Adults hospitalized for stroke who were newly admitted directly to long-term institutional care at the time of hospital discharge. Factors associated with new institutionalization. From 10,420 records, we included 18 studies (n = 32,139 participants). The studies were heterogeneous and conducted in Europe, North America, and East Asia. Eight studies were at high risk of selection bias. The proportion of those surviving to discharge who were newly discharged to long-term care varied from 7% to 39% (median 17%, interquartile range 12%), and the model of care received in the long-term care setting was not defined. Older age and greater stroke severity had a consistently positive association with the need for long-term care admission. Individuals who had a severe stroke were 26 times as likely to be admitted to long-term care than those who had a minor stroke. Individuals aged 65 and older had a risk of stroke that was three times as great as that of younger individuals. Potentially modifiable factors were rarely examined. Age and stroke severity are important predictors of institutional long-term care admission directly from the hospital after an acute stroke. Potentially modifiable factors should be the target of future research. Stroke outcome studies should report discharge destination, defining the model of care provided in the long-term care setting.

  15. Long-term Monitoring Plan for the Shoal Underground Nuclear Test

    International Nuclear Information System (INIS)

    Ahmed Hassan

    2005-01-01

    The flow and transport model of Shoal is used to design a three-well monitoring network to be part of the long-term monitoring network for the site and achieve two objectives: (1) detect the presence of radionuclides in case they migrate to the monitoring well locations, and (2) provide field data to compare with model predictions as part of the model validation process. Using three different quantitative approaches and the numerical groundwater flow and transport model developed for Shoal, three new monitoring well locations were identified from 176 different networks. In addition to the quantitative analyses using the numerical model, the development of the monitoring network for Shoal will also be subject to qualitative hydrogeologic interpretation during implementation. information will only be available during the fieldwork, it will be incorporated in the monitoring well design at the time of well installation. Finally, it should be noted that the CADD-CAP for Shoal, including the compliance boundary, is not yet approved. Should the compliance boundary change from the 1,000-year MCL contaminant boundary, well locations may also need to change. However, the analysis reported here provides a number of alternatives with reasonable detection efficiency

  16. Long-term Monitoring Plan for the Shoal Underground Nuclear Test

    Energy Technology Data Exchange (ETDEWEB)

    Ahmed Hassan

    2005-02-01

    The flow and transport model of Shoal is used to design a three-well monitoring network to be part of the long-term monitoring network for the site and achieve two objectives: (1) detect the presence of radionuclides in case they migrate to the monitoring well locations, and (2) provide field data to compare with model predictions as part of the model validation process. Using three different quantitative approaches and the numerical groundwater flow and transport model developed for Shoal, three new monitoring well locations were identified from 176 different networks. In addition to the quantitative analyses using the numerical model, the development of the monitoring network for Shoal will also be subject to qualitative hydrogeologic interpretation during implementation. information will only be available during the fieldwork, it will be incorporated in the monitoring well design at the time of well installation. Finally, it should be noted that the CADD-CAP for Shoal, including the compliance boundary, is not yet approved. Should the compliance boundary change from the 1,000-year MCL contaminant boundary, well locations may also need to change. However, the analysis reported here provides a number of alternatives with reasonable detection efficiency.

  17. Ark and Archive: Making a Place for Long-Term Research on Barro Colorado Island, Panama.

    Science.gov (United States)

    Raby, Megan

    2015-12-01

    Barro Colorado Island (BCI), Panama, may be the most studied tropical forest in the world. A 1,560-hectare island created by the flooding of the Panama Canal, BCI became a nature reserve and biological research station in 1923. Contemporaries saw the island as an "ark" preserving a sample of primeval tropical nature for scientific study. BCI was not simply "set aside," however. The project of making it a place for science significantly reshaped the island through the twentieth century. This essay demonstrates that BCI was constructed specifically to allow long-term observation of tropical organisms--their complex behaviors, life histories, population dynamics, and changing species composition. An evolving system of monitoring and information technology transformed the island into a living scientific "archive," in which the landscape became both an object and a repository of scientific knowledge. As a research site, BCI enabled a long-term, place-based form of collective empiricism, focused on the study of the ecology of a single tropical island. This essay articulates tropical ecology as a "science of the archive" in order to examine the origins of practices of environmental surveillance that have become central to debates about global change and conservation.

  18. From planning to practice: building the national network for the surveillance of severe maternal morbidity

    Directory of Open Access Journals (Sweden)

    Bahamondes Maria V

    2011-05-01

    Full Text Available Abstract Background Improving maternal health is one of the Millennium Development Goals for 2015. Recently some progress has been achieved in reducing mortality. On the other hand, in developed regions, maternal death is a relatively rare event compared to the number of cases of morbidity; hence studying maternal morbidity has become more relevant. Electronic surveillance systems may improve research by facilitating complete data reporting and reducing the time required for data collection and analysis. Therefore the purpose of this study was to describe the methods used in elaborating and implementing the National Network for the Surveillance of Severe Maternal Morbidity in Brazil. Methods The project consisted of a multicenter, cross-sectional study for the surveillance of severe maternal morbidity including near-miss, in Brazil. Results Following the development of a conceptual framework, centers were selected for inclusion in the network, consensus meetings were held among the centers, an electronic data collection system was identified, specific software and hardware tools were developed, research material was prepared, and the implementation process was initiated and analyzed. Conclusion The conceptual framework developed for this network was based on the experience acquired in various studies carried out in the area over recent years and encompasses maternal and perinatal health. It is innovative especially in the context of a developing country. The implementation of the project represents the first step towards this planned management. The system online elaborated for this surveillance network may be used in further studies in reproductive and perinatal health.

  19. Assessment of long-term and large-scale even-odd license plate controlled plan effects on urban air quality and its implication

    Science.gov (United States)

    Zhao, Suping; Yu, Ye; Qin, Dahe; Yin, Daiying; He, Jianjun

    2017-12-01

    To solve traffic congestion and to improve urban air quality, long-lasting and large-scale even-odd license plate controlled plan was implemented by local government during 20 November to 26 December 2016 in urban Lanzhou, a semi-arid valley city of northwest China. The traffic control measures provided an invaluable opportunity to evaluate its effects on urban air quality in less developed cities of northwest China. Based on measured simultaneously air pollutants and meteorological parameters, the abatement of traffic-related pollutants induced by the implemented control measures such as CO, PM2.5 and PM10 (the particulate matter with diameter less than 2.5 μm and 10 μm) concentrations were firstly quantified by comparing the air quality data in urban areas with those in rural areas (uncontrolled zones). The concentrations of CO, NO2 from motor vehicles and fine particulate matter (PM2.5) were shown to have significant decreases of 15%-23% during traffic control period from those measured before control period with hourly maximum CO, PM2.5, and NO2/SO2 reduction of 43%, 35% and 141.4%, respectively. The influence of the control measures on AQI (air quality index) and ozone was less as compared to its effect on other air pollutants. Therefore, to alleviate serious winter haze pollution in China and to protect human health, the stringent long-term and large-scale even-odd license plate controlled plan should be implemented aperiodically in urban areas, especially for the periods with poor diffusion conditions.

  20. Long-Range Research Plan, FY 1985-FY 1989

    International Nuclear Information System (INIS)

    1984-09-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. This document is divided into the following sections: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; advanced concepts; radiation protection and health effects; and waste management. The following are also listed as appendices: unresolved safety issues and TMI action plan items, priorities for research program, research program outline, and research utilization report. A glossary of acronyms is included

  1. Traumatic orodental injuries and the development of an orodental injury surveillance system: a pilot study in Victoria, Australia.

    Science.gov (United States)

    Tham, Rachel Catherine Anne; Cassell, Erin; Calache, Hanny

    2009-02-01

    Traumatic orodental injuries are common dental public health problems that have complex aetiology and significant impact on those affected. It is important to understand the frequency, pattern and causes of traumatic orodental injuries so that appropriate and effective treatment services are made available and injury prevention interventions are designed and implemented. The aims of this study were to measure the frequency, causes and patterns of traumatic orodental injuries in patients of all ages treated at the Royal Dental Hospital of Melbourne in Victoria, Australia, over a 12-month period and to investigate the feasibility of establishing an orodental injury surveillance system. For which, a retrospective audit of 304 patient records was undertaken and injury surveillance data were extracted and analysed. Males represented 67% of cases. Three-quarters of all cases were aged less than 24 years. The most frequent cause of orodental injury was falls from less than 1 m or being struck by or colliding with a person or object. Injuries occurred most commonly around the home, on the road, street or footpath, the sports ground and places for recreation and were most often associated with leisure and sports activities. Orodental injuries sustained in one traumatic incident were often multiple and serious. Many severe orodental trauma injury cases present at this public dental hospital are expensive to treat, require long-term management and may be preventable. The findings from this study have led to the development and planned implementation of an enhanced electronic orodental injury structured history form that incorporates the collection of key injury surveillance data. These prospective data are to be combined with injury surveillance data that are routinely collected by all Victorian public hospital emergency departments in order to improve understanding of the nature of orodental injuries impacting Victorian communities and assist with appropriate service

  2. Changing incentives for long-term gas contracts

    International Nuclear Information System (INIS)

    Bohi, D.R.

    1992-01-01

    There is much concern about the absence of long-term gas contracts with fixed price and quantity conditions, which until recent years was the standard way of doing business in the gas industry. These types of contracts performed a valuable service in the development of the gas industry, and there comparative absence today is sometimes thought to be one reason for the current malaise in the industry. One hears the argument that there must be some kind of 'market failure' that prevents buyers and sellers from entering into these long term arrangements, and recent changes in state and federal regulations are often cited as the cause of the problem. The purpose of the author's remarks is to argue that what is taken as a breakdown in the market may be simply a reaction to a decline in economic incentives to enter into long-term contracts with rigid price and quantity terms. This is, in other words, simply one more aspect of change in the gas business that Frank Heintz referred to in his opening remarks this morning. The author starts by giving a brief description of the motives for engaging in long-term contracts, and then describes how incentives to use long-term contracts have declined for both gas buyers and gas sellers. He concludes that the decline in the use of long-term contracts is not cause for regulatory concern, but a result of the continuing transformation of the gas business to one that more closely resembles other commodity markets

  3. A probabilistic assessment of large scale wind power development for long-term energy resource planning

    Science.gov (United States)

    Kennedy, Scott Warren

    contribution by synthesizing information from research in power market economics, power system reliability, and environmental impact assessment, to develop a comprehensive methodology for analyzing wind power in the context of long-term energy planning.

  4. Collaboration in Long-Term Stewardship at DOE's Hanford Site - 13019

    International Nuclear Information System (INIS)

    Moren, Rick; Brown, David; Feist, Ella; Grindstaff, Keith; Zeisloft, Jamie

    2013-01-01

    The U.S. Department of Energy's (DOE) Hanford Site comprises approximately 1,517 km 2 (586 mi 2 ) of land in southeastern Washington. The site was established in 1943 as part of the Manhattan Project to produce plutonium for the nation's nuclear weapons program. As the Cold War era came to an end, the mission of the site transitioned from weapons production to environmental cleanup. As the River Corridor area of the site cleanup is completed, the mission for that portion of the site will transition from active cleanup to continued protection of environment through the Long-Term Stewardship (LTS) Program. The key to successful transition from cleanup to LTS is the unique collaboration among three (3) different DOE Programs and three (3) different prime contractors with each contractor having different contracts. The LTS Program at the site is a successful model of collaboration resulting in efficient resolution of issues and accelerated progress that supports DOE's Richland Office 2015 Vision for the Hanford Site. The 2015 Vision for the Hanford Site involves shrinking the active cleanup footprint of the surface area of the site to approximately 20 mi 2 on the Central Plateau. Hanford's LTS Program is defined in DOE's planning document, Hanford Long-Term Stewardship Program Plan [1]. The Plan defines the relationship and respective responsibilities between the federal cleanup projects and the LTS Program along with their respective contractors. The LTS Program involves these different parties (cleanup program and contractors) who must work together to achieve the objective for transition of land parcels. Through the collaborative efforts with the prime contractors on site over the past two years,, 253.8 km 2 (98 mi 2 ) of property has been successfully transitioned from the cleanup program to the LTS Program upon completion of active surface cleanup. Upcoming efforts in the near term will include transitioning another large parcel that includes one of the six (6

  5. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  6. A Model for Long Range Planning for Seminole Community College.

    Science.gov (United States)

    Miner, Norris

    A model for long-range planning designed to maximize involvement of college personnel, to improve communication among various areas of the college, to provide a process for evaluation of long-range plans and the planning process, to adjust to changing conditions, to utilize data developed at a level useful for actual operations, and to have…

  7. Proceedings of the 13th forum: Croatian Energy Day: Long-term planning and consumer supply safety in open market conditions

    International Nuclear Information System (INIS)

    Granic, G.; Jelavic, B.

    2004-01-01

    The process of opening up the energy market has been proceeding at an accelerating pace; legislative and institutional prerequisites have come into existence for a transparent and nondiscriminatory approach to energy systems (networks), and for an easy market access to suppliers by granting customers the right of supplier choice. National borders - once an obstacle to energy market development - are thus eliminated. Advantages of this sort of development strategy for energy markets include top-quality competition and market de-monopolization, which in turn, as a rule, imply a more favorable position for the users of energy system services, for energy buyers / purchasers, and for consumers. However, the coexistence of internal (national) and international competitions raises the issue of the framework and contents of long-term planning, as well as of the liability of states and government institutions for the adequacy, security, and stability of energy sources, and consequently for customer supply security

  8. Long-term risks of kidney living donation

    DEFF Research Database (Denmark)

    Maggiore, Umberto; Budde, Klemens; Heemann, Uwe

    2017-01-01

    Two recent matched cohort studies from the USA and Norway published in 2014 have raised some concerns related to the long-term safety of kidney living donation. Further studies on the long-term risks of living donation have since been published. In this position paper, Developing Education Science...... and Care for Renal Transplantation in European States (DESCARTES) board members critically review the literature in an effort to summarize the current knowledge concerning long-term risks of kidney living donation to help physicians for decision-making purposes and for providing information...... to the prospective live donors. Long-term risk of end-stage renal disease (ESRD) can be partially foreseen by trying to identify donors at risk of developing ‘de novo’ kidney diseases during life post-donation and by predicting lifetime ESRD risk. However, lifetime risk may be difficult to assess in young donors...

  9. Animal health surveillance applications: The interaction of science and management.

    Science.gov (United States)

    Willeberg, Preben

    2012-08-01

    a sound working platform not only for dealing with immediate questions when new or emerging disease situations arise, but also for more long-term activities, such as policy development, contingency planning and trade negotiations. Animal health issues, which emerged during my eight years as a CVO in Denmark from 1999 to 2007, will be used as examples, including BSE, FMD, HPAI and Trichinella testing. Emphasis will be placed on how science-based surveillance methodology and tools were developed, applied and documented. Copyright © 2012 Elsevier B.V. All rights reserved.

  10. Long-term effects of radiation

    International Nuclear Information System (INIS)

    Smith, J.; Smith, T.

    1981-01-01

    It is pointed out that sources of long-term damage from radiation are two-fold. People who have been exposed to doses of radiation from initial early fallout but have recovered from the acute effects may still suffer long-term damage from their exposure. Those who have not been exposed to early fallout may be exposed to delayed fallout, the hazards from which are almost exclusively from ingesting strontium, caesium and carbon isotopes present in food; the damage caused is relatively unimportant compared with that caused by the brief doses from initial radiation and early fallout. A brief discussion is presented of the distribution of delayed long-lived isotope fallout, and an outline is sketched of late biological effects, such as malignant disease, cataracts, retarded development, infertility and genetic effects. (U.K.)

  11. Microbiological Food Safety Surveillance in China

    Directory of Open Access Journals (Sweden)

    Xiaoyan Pei

    2015-08-01

    Full Text Available Microbiological food safety surveillance is a system that collects data regarding food contamination by foodborne pathogens, parasites, viruses, and other harmful microbiological factors. It helps to understand the spectrum of food safety, timely detect food safety hazards, and provide relevant data for food safety supervision, risk assessment, and standards-setting. The study discusses the microbiological surveillance of food safety in China, and introduces the policies and history of the national microbiological surveillance system. In addition, the function and duties of different organizations and institutions are provided in this work, as well as the generation and content of the surveillance plan, quality control, database, and achievement of the microbiological surveillance of food safety in China.

  12. 77 FR 12227 - Long Term 2 Enhanced Surface Water Treatment Rule: Uncovered Finished Water Reservoirs; Public...

    Science.gov (United States)

    2012-02-29

    ... Water Treatment Rule: Uncovered Finished Water Reservoirs; Public Meeting AGENCY: Environmental... review of the uncovered finished water reservoir requirement in the Long Term 2 Enhanced Surface Water... uncovered finished water reservoir requirement and the agency's Six Year Review process. EPA also plans to...

  13. INEL D&D long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Buckland, R.J.; Kenoyer, D.J.; LaBuy, S.A.

    1995-09-01

    This Long-Range Plan presents the Decontamination and Dismantlement (D&D) Program planning status for facilities at the Idaho National Engineering Laboratory (INEL). The plan provides a general description of the D&D Program objectives, management criteria, and policy; discusses current activities; and documents the INEL D&D Program cost and schedule estimate projections for the next 15 years. Appendices are included that provide INEL D&D project historical information, a comprehensive descriptive summary of each current D&D surplus facility, and a summary database of all INEL contaminated facilities awaiting or undergoing the facility transition process.

  14. Redefining syndromic surveillance

    Directory of Open Access Journals (Sweden)

    Rebecca Katz

    2011-12-01

    Full Text Available With growing concerns about international spread of disease and expanding use of early disease detection surveillance methods, the field of syndromic surveillance has received increased attention over the last decade. The purpose of this article is to clarify the various meanings that have been assigned to the term syndromic surveillance and to propose a refined categorization of the characteristics of these systems. Existing literature and conference proceedings were examined on syndromic surveillance from 1998 to 2010, focusing on low- and middle-income settings. Based on the 36 unique definitions of syndromic surveillance found in the literature, five commonly accepted principles of syndromic surveillance systems were identified, as well as two fundamental categories: specific and non-specific disease detection. Ultimately, the proposed categorization of syndromic surveillance distinguishes between systems that focus on detecting defined syndromes or outcomes of interest and those that aim to uncover non-specific trends that suggest an outbreak may be occurring. By providing an accurate and comprehensive picture of this field’s capabilities, and differentiating among system types, a unified understanding of the syndromic surveillance field can be developed, encouraging the adoption, investment in, and implementation of these systems in settings that need bolstered surveillance capacity, particularly low- and middle-income countries.

  15. The environment in the Netherlands in the long-term

    International Nuclear Information System (INIS)

    Wieringa, K.; Maas, R.

    1992-01-01

    The environmental problem is one of the central elements in the newest long-term scenarios of the CPB (Dutch Central Planning Bureau). Will the environmental problems limit the economic growth for the next 25 years? Or can growth of production and consumption be combined with the environmental aims as formulated in the National Environmental Policy (NMP in Dutch). Being a preliminary study on the third National Environmental Outlook (to be published in 1993) the governmental institute for public health and environmental hygiene (RIVM) calculated the environmental impacts in the scenarios developed by the CPB. In particular attention is paid to the costs of the planned environmental policy. The scenarios discussed are Balanced Growth, characterized by a strong economic growth, sustainable economic development, and a dynamic technological development, the Global Shift scenario, characterized by a very dynamic technological development, and the European Renaissance scenario with a less dynamic development. 2 figs., 1 tab

  16. Strategy for Long-Term Stewardship and Monitoring of Amchitka Island - 12190

    Energy Technology Data Exchange (ETDEWEB)

    Kautsky, Mark; Nguyen, Jason [U.S. Department of Energy Office of Legacy Management (United States); Darr, Paul S. [S.M. Stoller Corporation (United States); Picel, Mary [Argonne National Laboratory (United States)

    2012-07-01

    The Long-Term Surveillance and Maintenance Plan (LTSMP) for Amchitka details how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at and around the sites on Amchitka Island. The LTSMP calls for monitoring to be performed every 5 years, at least in the initial phase of the project. The purpose of the monitoring is to develop a baseline of activity concentrations for selected radionuclides in biota, water, and soil, both on Amchitka and at the reference location on Adak Island, approximately 322 km (200 miles) northeast of Amchitka. Data compiled by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP, 2006) are being included as part of the baseline data set. The specific biological, water, and sediment samples collected during the 2011 sampling event were developed through close coordination with the primary stakeholders, including the Alaska Department of Environmental Conservation, the Aleutian Pribilof Island Association, and the U.S. Fish and Wildlife Service (USFWS). Amchitka is managed by the USFWS as part of the Alaska Maritime National Wildlife Refuge. Two plans were developed to address specific needs of the biological- and the terrestrial-monitoring programs. Results from these monitoring programs will help determine whether the environment is being impacted by radionuclide migration and uptake, and if subsistence and commercial-catch seafood is safe for human consumption. The RESRAD-BIOTA code is being used to evaluate ecological health relative to the radionuclide levels determined from this sampling event. The samples were sent to three laboratories for analysis. With the exception of the seawater samples, most of the samples were sent to the Center for Accelerator Mass Spectrometry at the Lawrence Livermore National Laboratory. A smaller subset of rock-weed samples, Star reindeer lichen samples, and soil samples collected from beneath the lichen were sent

  17. The National Long Term Care Demonstration: operational issues encountered in developing the research design.

    Science.gov (United States)

    Carcagno, G J; Kemper, P

    1983-01-01

    This paper describes the design of the National Long Term Care Demonstration and its evaluation and discusses a number of operational issues encountered in the design process: simultaneous design of research and operations, identification of the target population, randomization, collection of comparable data, development of an assessment instrument, potential changes in existing programs, and termination planning.

  18. Beyond Quarterly Earnings: Preparing the Business Community for Long-term Climate Risks

    Science.gov (United States)

    Carlson, C.; Goldman, G. T.

    2014-12-01

    The business community stands to be highly impacted by climate change. In both short and long-term timescales, climate change presents material and financial risks to companies in diverse economic sectors. How the private sector accounts for long-term risks while making short-term decisions about operations is a complex challenge. Companies are accountable to shareholders and must report performance to them on a quarterly basis. At the same time, company investors are exposed to long-term climate-related risks and face losses if companies fail to prepare for climate impacts. The US Securities and Exchange Commission (SEC) obligates publicly traded companies to discuss risks that might materially affect their business and since 2010, the agency recommends that companies consider and discuss any significant risks to their business from climate change. Some companies have complied with this guidance and comprehensively analyze potential climate change impacts, yet others fail to consider climate change at all. Such omissions leave companies without plans for addressing future risks and expose investors and the public to potential catastrophic events from climate change impacts. Climate risk projections can inform companies about the vulnerability of their facilities, supply chains, transportation pathways, and other assets. Such projections can help put climate-related risks in terms of material costs for companies and their investors. Focusing on the vulnerability of coastal facilities, we will use climate change impact projections to demonstrate the economic impacts of climate change faced by the private sector. These risks are then compared to company disclosures to the SEC to assess the degree to which companies have considered their vulnerability to climate change. Finally, we will discuss ways that companies can better assess and manage long-term climate risks.

  19. Long-term effects of a climate change teaching campaign – a case study

    DEFF Research Database (Denmark)

    Cruys-Bagger, Søren Ib; Daugbjerg, Peer

    The authors perform in association with School of Education, Aarhus University an evaluation of the long term effects of the campaign visit. We are investigating the sustainable effect of science campaigns for schools by collecting teachers reflection on the value of the visit of “Klimakaravanen”...... of doing experiments c) Relations to technological companies and the civil society d) Skills of planning, performing and evaluating teaching...

  20. What are the differences between long-term, short-term, and working memory?

    OpenAIRE

    Cowan, Nelson

    2008-01-01

    In the recent literature there has been considerable confusion about the three types of memory: long-term, short-term, and working memory. This chapter strives to reduce that confusion and makes up-to-date assessments of these types of memory. Long- and short-term memory could differ in two fundamental ways, with only short-term memory demonstrating (1) temporal decay and (2) chunk capacity limits. Both properties of short-term memory are still controversial but the current literature is rath...

  1. Workshop proceedings: Developing the scientific basis for long-term land management of the Idaho National Engineering and Environmental Laboratory

    International Nuclear Information System (INIS)

    Sperber, T.D.; Reynolds, T.D.

    1998-03-01

    Responses to a survey on the INEEL Comprehensive Facility and Land Use Plan (US DOE 1996a) indicated the need for additional discussion on environmental resources, disturbance, and land use issues on the Idaho National Engineering and Environmental Laboratory (INEEL). As a result, in September 1997, a workshop evaluated the existing scientific basis and determined future data needs for long-term land management on the INEEL. This INEEL Long-Term Land Management Workshop examined existing data on biotic, abiotic, and heritage resources and how these resources have been impacted by disturbance activities of the INEEL. Information gained from this workshop will help guide land and facility use decisions, identify data gaps, and focus future research efforts. This report summarizes background information on the INEEL and its long-term land use planning efforts, presentations and discussions at the workshop, and the existing data available at the INEEL. In this document, recommendations for future INEEL land use planning, research efforts, and future workshops are presented. The authors emphasize these are not policy statements, but comments and suggestions made by scientists and others participating in the workshop. Several appendices covering land use disturbance, legal drivers, land use assumptions and workshop participant comments, workshop participants and contributors, and the workshop agenda are also included

  2. Workshop proceedings: Developing the scientific basis for long-term land management of the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Sperber, T.D.; Reynolds, T.D. [eds.] [Environmental Science and Research Foundation, Inc., Idaho Falls, ID (United States); Breckenridge, R.P. [ed.] [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States)

    1998-03-01

    Responses to a survey on the INEEL Comprehensive Facility and Land Use Plan (US DOE 1996a) indicated the need for additional discussion on environmental resources, disturbance, and land use issues on the Idaho National Engineering and Environmental Laboratory (INEEL). As a result, in September 1997, a workshop evaluated the existing scientific basis and determined future data needs for long-term land management on the INEEL. This INEEL Long-Term Land Management Workshop examined existing data on biotic, abiotic, and heritage resources and how these resources have been impacted by disturbance activities of the INEEL. Information gained from this workshop will help guide land and facility use decisions, identify data gaps, and focus future research efforts. This report summarizes background information on the INEEL and its long-term land use planning efforts, presentations and discussions at the workshop, and the existing data available at the INEEL. In this document, recommendations for future INEEL land use planning, research efforts, and future workshops are presented. The authors emphasize these are not policy statements, but comments and suggestions made by scientists and others participating in the workshop. Several appendices covering land use disturbance, legal drivers, land use assumptions and workshop participant comments, workshop participants and contributors, and the workshop agenda are also included.

  3. Long-term hearing preservation in vestibular schwannoma

    DEFF Research Database (Denmark)

    Stangerup, Sven-Eric; Thomsen, Jens; Tos, Mirko

    2010-01-01

    The aim of the present study was to evaluate the long-term hearing during "wait and scan" management of vestibular schwannomas.......The aim of the present study was to evaluate the long-term hearing during "wait and scan" management of vestibular schwannomas....

  4. Longitudinal outcomes of radiofrequency ablation versus surveillance endoscopy for Barrett's esophagus with low-grade dysplasia.

    Science.gov (United States)

    Kahn, A; Al-Qaisi, M; Kommineni, V T; Callaway, J K; Boroff, E S; Burdick, G E; Lam-Himlin, D M; Temkit, M; Vela, M F; Ramirez, F C

    2018-04-01

    Radiofrequency ablation of Barrett's esophagus with low-grade dysplasia is recommended in recent American College of Gastroenterology guidelines, with endoscopic surveillance considered a reasonable alternative. Few studies have directly compared outcomes of radiofrequency ablation to surveillance and those that have are limited by short duration of follow-up. This study aims to compare the long-term effectiveness of radiofrequency ablation versus endoscopic surveillance in a large, longitudinal cohort of patients with Barrett's esophagus, and low-grade dysplasia.We conducted a retrospective analysis of patients with confirmed low-grade dysplasia at a single academic medical center from 1991 to 2014. Patients progressing to high-grade dysplasia or esophageal adenocarcinoma within one year of index LGD endoscopy were defined as missed dysplasia and excluded. Risk factors for progression were assessed via Cox proportional hazards model. Comparison of progression risk was conducted using a Kaplan-Meier analysis. Subset analyses were conducted to examine the effect of reintroducing early progressors and excluding patients diagnosed prior to the advent of ablative therapy. Of 173 total patients, 79 (45.7%) underwent radiofrequency ablation while 94 (54.3%) were untreated, with median follow up of 90 months. Seven (8.9%) patients progressed to high-grade dysplasia or adenocarcinoma despite ablation, compared with 14 (14.9%) undergoing surveillance (P = 0.44). This effect was preserved when patients diagnosed prior to the introduction of radiofrequency ablation were excluded (8.9% vs 13%, P = 0.68). Reintroduction of patients progressing within the first year of follow-up resulted in a trend toward significance for ablation versus surveillance (11.1% vs 23.8%, P = 0.053).In conclusion, progression to high-grade dysplasia or adenocarcinoma was not significantly reduced in the radiofrequency ablation cohort when compared to surveillance. Despite recent studies

  5. Natural history of diminutive colorectal polyps: long-term prospective observation by colonoscopy.

    Science.gov (United States)

    Mizuno, Ken-Ichi; Suzuki, Yutaka; Takeuchi, Manabu; Kobayashi, Masaaki; Aoyagi, Yutaka

    2014-04-01

    Endoscopic removal of colorectal adenomatous polyps effectively prevents cancer. However, the treatment strategy for diminutive polyps (diameter ≤ 5 mm) remains controversial. Understanding the natural history of diminutive polyps is a prerequisite to their effective management. We prospectively examined the natural history of diminutive polyps by long-term surveillance colonoscopy. A total of 207 polyps detected in 112 patients from December 1991 through March 2002 were studied. To avoid potential effects on size and morphological characteristics, all polyps were selected randomly and were followed without biopsy. Polyp size was estimated by comparing the lesion with the diameter of a biopsy forceps. Mean follow up was 7.8 years (SD, 4.8; range, 1.0-18.6; median, 7.5; interquartile range 3.4-11.2). Twenty-four polyps were resected endoscopically, and the histopathological diagnosis was mucosal high-grade neoplasia (Category 4) for one polyp, and mucosal low-grade neoplasia (Category 3) for 23 polyps. Mean linear size of the polyps was 3.2 mm (SD, 1.0; range, 1.3-5.0) at initial colonoscopy and 3.8 mm (SD 1.6; range 1.3-10.0) at final colonoscopy (Ppit pattern was associated with a lower growth rate than a type IIIL1 pattern. We clarified the natural history of diminutive polyps by long-term follow-up colonoscopy. The benign course of diminutive polyps should be considered in the design of treatment strategies. © 2014 The Authors. Digestive Endoscopy © 2014 Japan Gastroenterological Endoscopy Society.

  6. The Lawrence Livermore National Laboratory DOE-STD-3013 Surveillance Program for the Storage of Plutonium Packages

    International Nuclear Information System (INIS)

    Riley, D

    2005-01-01

    This document presents a site-specific DOE-STD-3013 (3013) surveillance program for 3013 material stored at Lawrence Livermore National Laboratory (LLNL) in the B332 Plutonium Facility. The 3013 standard requires the development of a surveillance program to assure the long-term safety of plutonium storage in 3013 compliant containers. A complex-wide Integrated Surveillance Program in Support of Long-Term Storage of Plutonium-Bearing Materials (ISP)(LA-UR-00-3246, Revision 1, March 2001) has been developed to give guidance on an acceptable surveillance approach and to set up a mechanism to integrate surveillance activities and facilitate the sharing of lessons learned. This LLNL 3013 surveillance program has been developed following guidelines established for Storage Sites in the ISP and is sufficient for the storage in the LLNL Plutonium Facility. The LLNL 3013 surveillance program must be coupled with the DOE complex wide Materials Identification and Surveillance (MIS) program and the ISP led by Savannah River Site (SRS). These programs support the technical basis for continuing safe storage of plutonium packages and provide the technical basis for the limited scope of the site-specific LLNL 3013 surveillance program. The LLNL 3013 surveillance program calls for surveillance of 3013 packages to begin approximately three years after packaging of the first oxide. One percent of the stored packages per year will be randomly selected and nondestructively examined (NDE) by LLNL per the guidelines of the ISP. Additional packages may be selected for NDE if recommended by the ISP Steering Committee and agreed upon by the MIS Working Group. One selected package will be shipped to SRS for destructive analysis each year starting when SRS can receive them. This is expected to be in FY2007. We expect to store a maximum of 400 3013 packages. This would result in an expected maximum of 4 surveillances per year. The activities outlined in the program evolved from the current

  7. [An overview of surveillance of avian influenza viruses in wild birds].

    Science.gov (United States)

    Zhu, Yun; Shi, Jing-Hong; Shu, Yue-Long

    2014-05-01

    Wild birds (mainly Anseriformes and Charadriiformes) are recognized as the natural reservoir of avian influenza viruses (AIVs). The long-term surveillance of AIVs in wild birds has been conducted in North America and Europe since 1970s. More and more surveillance data revealed that all the HA and NA subtypes of AIVs were identified in the wild ducks, shorebirds, and gulls, and the AIVs circulating in wild birds were implicated in the outbreaks of AIVs in poultry and humans. Therefore, the AIVs in wild birds pose huge threat to poultry industry and human health. To gain a better understanding of the ecology and epidemiology of AIVs in wild birds, we summarize the transmission of AIVs between wild birds, poultry, and humans, the main results of surveillance of AIVs in wild birds worldwide and methods for surveillance, and the types of samples and detection methods for AIVs in wild birds, which would be vital for the effective control of avian influenza and response to possible influenza pandemic.

  8. Integrating animal health and food safety surveillance data from slaughterhouse control.

    Science.gov (United States)

    Lynch, J A; Silva, P

    2013-08-01

    Surveillance at the slaughterhouse level for animal health and food safety purposes encompasses examination for the presence of pathology, pathogens, drug residues, chemical contaminants and antimicrobial resistance. Government, industry and academia are the primary proponents of such surveillance. A variety of policies and policy instruments from voluntary to legislative may be applied to promote or obligate participation. Efforts to integrate data across such diverse organisations encounter significant legal, logistical and financial challenges. Enhancement of policies to encourage effective integration of animal health and food safety surveillance data from slaughterhouse control should promote: a long-term approach; collaboration among government, industry and academia; application of a risk-based scheme; and transparent public access to data, with generation of consumer-oriented communications derived from the data. A strong case can be made that the complementary pursuit of both sustainable animal health and food safety can continue to be aided by surveillance at the slaughterhouse level.

  9. Long-Term Patency of Lymphovenous Anastomoses: A Systematic Review.

    Science.gov (United States)

    Tourani, Saam S; Taylor, G Ian; Ashton, Mark W

    2016-08-01

    With advancements in technology and microsurgical techniques, lymphovenous anastomosis has become a popular reconstructive procedure in the treatment of chronic lymphedema. However, the long-term patency of these anastomoses is not clear in the literature. A systematic review of the MEDLINE and EMBASE databases was performed to assess the reported long-term patency of lymphovenous anastomoses. A total of eight studies satisfied the inclusion criteria. Pooled data from four similar experiments in normal dogs showed an average long-term (≥5 months) patency of 52 percent. The only experiment in dogs with chronic lymphedema failed to show any long-term patency. The creation of peripheral lymphovenous anastomoses with a moderate long-term patency rate has become technically possible. However, the long-term results in chronic lymphedema are limited.

  10. Long-Term Orientation in Trade

    NARCIS (Netherlands)

    Hofstede, G.J.; Jonker, C.M.; Verwaart, D.

    2008-01-01

    Trust does not work in the same way across cultures. This paper presents an agent model of behavior in trade across Hofstedes cultural dimension of long-term vs. short-term orientation. The situation is based on a gaming simulation, the Trust and Tracing game. The paper investigates the

  11. Liquid nitrogen spray cryotherapy in Barrett's esophagus with high-grade dysplasia: long-term results.

    Science.gov (United States)

    Gosain, Sonia; Mercer, Kim; Twaddell, William S; Uradomo, Lance; Greenwald, Bruce D

    2013-08-01

    Liquid nitrogen endoscopic spray cryotherapy can safely and effectively eradicate high-grade dysplasia in Barrett's esophagus (BE-HGD). Long-term data on treatment success and safety are lacking. To assess the long-term safety and efficacy of spray cryotherapy in patients with BE-HGD. Single-center, retrospective study. Tertiary-care referral center. A total of 32 patients with BE-HGD of any length. Patients were treated with liquid nitrogen spray cryotherapy every 8 weeks until complete eradication of HGD (CE-HGD) and intestinal metaplasia (CE-IM) was found by endoscopic biopsy. Surveillance endoscopy with biopsies was performed for at least 2 years. CE-HGD, CE-IM, durability of response, disease progression, and adverse events. CE-HGD was 100% (32/32), and CE-IM was 84% (27/32) at 2-year follow-up. At last follow-up (range 24-57 months), CE-HGD was 31/32 (97%), and CE-IM was 26/32 (81%). Recurrent HGD was found in 6 (18%), with CE-HGD in 5 after repeat treatment. One patient progressed to adenocarcinoma, downgraded to HGD after repeat cryotherapy. BE segment length ≥3 cm was associated with a higher recurrence of IM (P = .004; odds ratio 22.6) but not HGD. No serious adverse events occurred. Stricture was seen in 3 patients (9%), all successfully dilated. Retrospective study design, small sample size. In patients with BE-HGD, liquid nitrogen spray cryotherapy has an acceptable safety profile and success rate for eliminating HGD and IM and is associated with a low rate of recurrence or progression to cancer with long-term follow-up. Copyright © 2013 American Society for Gastrointestinal Endoscopy. Published by Mosby, Inc. All rights reserved.

  12. Long-term Maintenance of Fungal Cultures on Perlite in Cryovials – an Alternative for Agar Slants

    Czech Academy of Sciences Publication Activity Database

    Homolka, Ladislav; Lisá, Ludmila

    2008-01-01

    Roč. 53, č. 6 (2008), s. 534-536 ISSN 0015-5632 R&D Projects: GA MŠk LC06066 Institutional research plan: CEZ:AV0Z50200510 Keywords : basidiomycete * perlite * long-term maintenance Subject RIV: EE - Microbiology, Virology Impact factor: 1.172, year: 2008

  13. Long-term effects of childbirth in MS

    NARCIS (Netherlands)

    D'hooghe, M.B.; Nagels, G.; Uitdehaag, B.M.J.

    2010-01-01

    Background: The uncertainty about long-term effects of childbirth presents MS patients with dilemmas. Methods: Based on clinical data of 330 female MS patients, the long-term effects of childbirth were analysed, using a cross-sectional study design. Four groups of patients were distinguished: (1)

  14. Long-term trends in foF2: their estimating and origin

    Czech Academy of Sciences Publication Activity Database

    Laštovička, Jan; Yue, X.; Wan, W.

    2008-01-01

    Roč. 26, č. 3 (2008), s. 593-598 ISSN 0992-7689 R&D Projects: GA MŠk OC 091 Grant - others:COST(XE) 296; National Science Foundation of China(CN) 40636032; National Science Foundation of China(CN) 40574071; National important Basic Research Project(CN) 2006CB806306 Institutional research plan: CEZ:AV0Z30420517 Keywords : ionosphere * long-term trends * geomagnetism and paleomagnetism * Radio Science Subject RIV: DG - Athmosphere Sciences, Meteorology Impact factor: 1.660, year: 2008 http://www.ann-geophys.net/26/593/2008/

  15. Information resources management long-range plan, FY1994--1998

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

  16. Information resources management long-range plan, FY1994--1998

    International Nuclear Information System (INIS)

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements

  17. The Representation of Action Plans in Long Term Memory

    Science.gov (United States)

    Fussfeld, G. N.; Koenig, W.; Karis, D.

    1984-01-01

    A sequence of experiments conducted on a two hand chord typewriter, to compare the efficiency of different coding principles employed to associate letters with their chord productions is described. This keyboard represents an effort to identify effective alternatives to the existing typewriter. It consists of two seperate 5-key panels (one for each hand), and letters are entered by typing chords composed of one to five fingers. Each panel is capable of producing the full alphabet. One group of experiments was designed to separate between perceptual and motor factors in the acivation of single letter chords. The results underline the importance of perceptual factors in the activation of motor plans. The complexity of the patterns employed to represent letters was shown to account for 50 percent of variance in the typing speeds of single letters. The theoretical implications of these results are discussed in relation to a vision based theory of action plans.

  18. Social scientist on board in long-term management of high level and/or long-lived radioactive waste in Belgium

    International Nuclear Information System (INIS)

    Parotte, C.

    2013-01-01

    In Belgium, the long-term management of radioactive waste is under the exclusive competence of the Belgian Agency for Radioactive Waste and Enriched Fissile Materials (knew as ONDRAF/NIRAS). Unlike low-level waste, no institutional policy has yet been formally approved for the long-term management of high level and/or long-lived radioactive waste (knew as B and C waste). In this context, ONDRAF/NIRAS considers the public and stakeholders' participation as an essential factor in the formulation of an effective and legitimate policy. This is why it has decided to integrate them in different ways during the elaboration of the Waste Plan (ONDRAF/NIRAS-document containing guidelines to make a principled policy decision about nuclear waste management). To do so, social scientists have been regularly mobilized either as external evaluators, follow-up committee members, or participatory observants. Hence, the Waste Plan is only the first step in a long decision-making process. For a PhD student under contract with ONDRAF/NIRAS, this mandate consists of thinking out a way to construct an inter-organizational innovative communication system that would be participative, transparent and embedded in a long-term perspective, thus integrating all the further legal steps to take throughout the decision-making process. In this regard, two paradoxical constraints must be taken into account: on the one hand, my own influence on the legal decision-making process should remain limited, because of a series of constraints, lock-ins and previous decisions which have to be respected; on the other hand, ONDRAF/NIRAS expects the research conclusions to be policy relevant and useful. In this paper, the purpose is twofold. Firstly, the issues raised by this policy mandate is an opportunity to question the per-formative dimensions of the social scientist in the decision-making process and, more specifically, to have a reflexive view on our position as PhD Student. Secondly, assuming the

  19. Social scientist on board in long-term management of high level and/or long-lived radioactive waste in Belgium

    Energy Technology Data Exchange (ETDEWEB)

    Parotte, C. [Spiral Research Center, Department of Political Sciences, Faculty of Law, University of Liege (Belgium)

    2013-07-01

    In Belgium, the long-term management of radioactive waste is under the exclusive competence of the Belgian Agency for Radioactive Waste and Enriched Fissile Materials (knew as ONDRAF/NIRAS). Unlike low-level waste, no institutional policy has yet been formally approved for the long-term management of high level and/or long-lived radioactive waste (knew as B and C waste). In this context, ONDRAF/NIRAS considers the public and stakeholders' participation as an essential factor in the formulation of an effective and legitimate policy. This is why it has decided to integrate them in different ways during the elaboration of the Waste Plan (ONDRAF/NIRAS-document containing guidelines to make a principled policy decision about nuclear waste management). To do so, social scientists have been regularly mobilized either as external evaluators, follow-up committee members, or participatory observants. Hence, the Waste Plan is only the first step in a long decision-making process. For a PhD student under contract with ONDRAF/NIRAS, this mandate consists of thinking out a way to construct an inter-organizational innovative communication system that would be participative, transparent and embedded in a long-term perspective, thus integrating all the further legal steps to take throughout the decision-making process. In this regard, two paradoxical constraints must be taken into account: on the one hand, my own influence on the legal decision-making process should remain limited, because of a series of constraints, lock-ins and previous decisions which have to be respected; on the other hand, ONDRAF/NIRAS expects the research conclusions to be policy relevant and useful. In this paper, the purpose is twofold. Firstly, the issues raised by this policy mandate is an opportunity to question the per-formative dimensions of the social scientist in the decision-making process and, more specifically, to have a reflexive view on our position as PhD Student. Secondly, assuming the

  20. Hippocampal Focal Knockout of CBP Affects Specific Histone Modifications, Long-Term Potentiation, and Long-Term Memory

    Science.gov (United States)

    Barrett, Ruth M; Malvaez, Melissa; Kramar, Eniko; Matheos, Dina P; Arrizon, Abraham; Cabrera, Sara M; Lynch, Gary; Greene, Robert W; Wood, Marcelo A

    2011-01-01

    To identify the role of the histone acetyltransferase (HAT) CREB-binding protein (CBP) in neurons of the CA1 region of the hippocampus during memory formation, we examine the effects of a focal homozygous knockout of CBP on histone modifications, gene expression, synaptic plasticity, and long-term memory. We show that CBP is critical for the in vivo acetylation of lysines on histones H2B, H3, and H4. CBP's homolog p300 was unable to compensate for the loss of CBP. Neurons lacking CBP maintained phosphorylation of the transcription factor CREB, yet failed to activate CREB:CBP-mediated gene expression. Loss of CBP in dorsal CA1 of the hippocampus resulted in selective impairments to long-term potentiation and long-term memory for contextual fear and object recognition. Together, these results suggest a necessary role for specific chromatin modifications, selectively mediated by CBP in the consolidation of memories. PMID:21508930