WorldWideScience

Sample records for load management program

  1. Technical Potential for Peak Load Management Programs in New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, B.J.

    2002-12-13

    producers and consumers. Fortunately too, only a percentage of loads need to respond elastically for all customers to benefit. This report explores mechanisms to reduce, when necessary, the peak load in New Jersey's electricity market. It examines load pricing and technical load reduction programs used in recent years in New Jersey and discuss how they can be made more effective in controlling summer peaks and attendant high prices of electricity. Particular attention is given to load curtailment programs now in place and utility opinions relating to them.

  2. Status of load management

    Energy Technology Data Exchange (ETDEWEB)

    Juchymenko, A

    1983-08-01

    A summary is presented of the status of load management, defined as any activity by an electric utility to affect the size and characteristics of its load. Load management is currently viewed by electric utilities as an important tool for marketing electricity in a competitive fuel situation. A major aim of the National Energy Program is to reduce Canada's dependence on oil by 1990 to 10% of the energy used by all markets. As a result, electricity may play a greater role in the supply of primary energy. Research in load management has been directed mostly towards the residential market, especially direct control of domestic hot water heaters and air conditioners. Studies conducted in Canada and the U.S. to determine user's receptiveness to direct control of loads and thermal energy storage systems indicate that these load management techniques are in most cases not acceptable to customers, who prefer voluntary reduction in demand. The potential exists in the industrial market to use load management to assist in electrifying many of the fossil fuel-fired processes at competitive energy prices. Some of the more important applications include an industrial heat pump to heat liquids to 120{degree}C, induction heating for melting and heat treating of metals, and mechanical vapor recompression equipment to produce proces steam. 21 refs., 2 figs., 2 tabs.

  3. Market-oriented programming and its application to power load management

    Energy Technology Data Exchange (ETDEWEB)

    Ygge, F

    1998-04-01

    Market-oriented programming is a new approach to design and implementation of resource allocation mechanisms in computer systems. It has its roots in different disciplines, such as economics and computer science (in particular the area of multi-agent systems). This is divided into two different parts, focusing on: (1) central foundations and mechanisms of market-oriented programming, and (2) the use of market-oriented programming in practical applications. Market-oriented programming is seen as a programming paradigm based on abstractions such as prices and demands. Concepts, terminology and theory from micro-economics form the foundations of the paradigm. Central aspects of these foundations are investigated and some new insights are presented. Furthermore, some relations between standard optimization/resource allocation approaches and markets are described, and novel theorems are introduced. A published, and generally recognized, market oriented approach to the application building climate control is analyzed in detail. A new approach to this application, based on market-oriented programming, is introduced and shown to be superior to the analyzed approach in many ways. The case study pinpoints a number of potential pitfalls as well as advantages of market-oriented approaches to this and other applications. A second investigated application is power load management, i.e. the management of loads at the customer`s side for obtaining more efficient energy systems management. The basis of the application is described and a new market oriented approach is introduced and analyzed. The approach is shown to have a number of advantages compared to existing approaches to this problem. The main conclusion of the thesis is that there are some potential pitfalls of market-oriented programming, but when used with care it provides a highly natural and efficient means for resource allocation in computer systems

  4. Review of current Southern California edison load management programs and proposal for a new market-driven, mass-market, demand-response program

    Energy Technology Data Exchange (ETDEWEB)

    Weller, G.H.

    2002-01-01

    Utility load management programs, including direct load control and interruptible load programs, constitute a large installed base of controllable loads that are employed by utilities as system reliability resources. In response to energy supply shortfalls expected during the summer of 2001, the California Public Utilities Commission in spring 2001 authorized new utility load management programs as well as revisions to existing programs. This report provides an independent review of the designs of these new programs for a large utility (Southern California Edison) and suggests possible improvements to enhance the price responsiveness of the customer actions influenced by these programs. The report also proposes a new program to elicit a mass-market demand response to utility price signals.

  5. LOADING SIMULATION PROGRAM C

    Science.gov (United States)

    LSPC is the Loading Simulation Program in C++, a watershed modeling system that includes streamlined Hydrologic Simulation Program Fortran (HSPF) algorithms for simulating hydrology, sediment, and general water quality

  6. LOADING SIMULATION PROGRAM C

    Data.gov (United States)

    U.S. Environmental Protection Agency — LSPC is the Loading Simulation Program in C++, a watershed modeling system that includes streamlined Hydrologic Simulation Program Fortran (HSPF) algorithms for...

  7. Electric utility load management: rational use of energy program pilot study

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-01

    In recognition of the role that load management can play in ensuring that the growing demand for electricity is met in a cost- and energy-efficient manner, in mid-1974, the NATO Committee on the Challenges of Modern Society sponsored all three meetings to provide a forum for representatives of U.S. and European utilities to exchange views and experiences on the various aspects of load management. It was the consensus of representatives at the meetings that three overall approaches offer significant opportunities for achieving improved load management: development of marginal-cost rate structures; power pooling and energy storage by utilities; and efforts by consumers. Industrial consumers can assist electric utilities in their efforts to level system loads through three important methods: interruptible power and deferred load control; peak self-generation; and shifts in operating schedules. Residential/commercial consumers also have an important role to play by managing both their electric heating load (through the interruption of direct-resistance heating and the storage of heat) and their air conditioning load. In response to the interest expressed by the participants in the CCMS conferences, the U.S. and several European governments, national electric utility industry organizations, state public utility commissions, and many individual utilities have undertaken R and D projects to investigate and test various aspects of these three approaches to load management. This report describes the projects that were presented by the utility representatives.

  8. An improved risk-explicit interval linear programming model for pollution load allocation for watershed management.

    Science.gov (United States)

    Xia, Bisheng; Qian, Xin; Yao, Hong

    2017-11-01

    Although the risk-explicit interval linear programming (REILP) model has solved the problem of having interval solutions, it has an equity problem, which can lead to unbalanced allocation between different decision variables. Therefore, an improved REILP model is proposed. This model adds an equity objective function and three constraint conditions to overcome this equity problem. In this case, pollution reduction is in proportion to pollutant load, which supports balanced development between different regional economies. The model is used to solve the problem of pollution load allocation in a small transboundary watershed. Compared with the REILP original model result, our model achieves equity between the upstream and downstream pollutant loads; it also overcomes the problem of greatest pollution reduction, where sources are nearest to the control section. The model provides a better solution to the problem of pollution load allocation than previous versions.

  9. A case study review of technical and technology issues for transition of a utility load management program to provide system reliability resources in restructured electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Weller, G.H.

    2001-07-15

    Utility load management programs--including direct load control and interruptible load programs--were employed by utilities in the past as system reliability resources. With electricity industry restructuring, the context for these programs has changed; the market that was once controlled by vertically integrated utilities has become competitive, raising the question: can existing load management programs be modified so that they can effectively participate in competitive energy markets? In the short run, modified and/or improved operation of load management programs may be the most effective form of demand-side response available to the electricity system today. However, in light of recent technological advances in metering, communication, and load control, utility load management programs must be carefully reviewed in order to determine appropriate investments to support this transition. This report investigates the feasibility of and options for modifying an existing utility load management system so that it might provide reliability services (i.e. ancillary services) in the competitive markets that have resulted from electricity industry restructuring. The report is a case study of Southern California Edison's (SCE) load management programs. SCE was chosen because it operates one of the largest load management programs in the country and it operates them within a competitive wholesale electricity market. The report describes a wide range of existing and soon-to-be-available communication, control, and metering technologies that could be used to facilitate the evolution of SCE's load management programs and systems to provision of reliability services. The fundamental finding of this report is that, with modifications, SCE's load management infrastructure could be transitioned to provide critical ancillary services in competitive electricity markets, employing currently or soon-to-be available load control technologies.

  10. Burnout in Nurse Faculty: Relationships with Management Style, Collegial Support, and Work Load in Collegiate Programs.

    Science.gov (United States)

    Dick, Margaret Jorgensen

    1986-01-01

    A study of the relationship of management behavior of the dean, collegial support, and workload to burnout among faculty in collegiate nursing programs found that collegial support, positive feedback from the dean, and a participatory management style are more important for protecting faculty against burnout than attention to workload. (MSE)

  11. Optimum residential load management strategy for real time pricing (RTP) demand response programs

    International Nuclear Information System (INIS)

    Lujano-Rojas, Juan M.; Monteiro, Cláudio; Dufo-López, Rodolfo; Bernal-Agustín, José L.

    2012-01-01

    This paper presents an optimal load management strategy for residential consumers that utilizes the communication infrastructure of the future smart grid. The strategy considers predictions of electricity prices, energy demand, renewable power production, and power-purchase of energy of the consumer in determining the optimal relationship between hourly electricity prices and the use of different household appliances and electric vehicles in a typical smart house. The proposed strategy is illustrated using two study cases corresponding to a house located in Zaragoza (Spain) for a typical day in summer. Results show that the proposed model allows users to control their diary energy consumption and adapt their electricity bills to their actual economical situation. - Highlights: ► This work shows an optimal load management strategy for residential consumers. ► It has been considered the communication infrastructure of the future smart grid. ► A study case shows the optimal utilization of some appliances and electric vehicles. ► Results showed that the proposed model allows users to reduce their electricity bill.

  12. Lessons Learned: A review of utility experience with conservation and load management programs for commercial and industrial customers

    Energy Technology Data Exchange (ETDEWEB)

    Nadel, S.

    1990-10-01

    This report examines utility experience with conservation and load management (C LM) programs of commercial and industrial (C I) customers in order to summarize the lessons learned from program experiences to date and what these teach us about how to operate successful programs in the future. This analysis was motivated by a desire to learn about programs which achieve high participation rates and high electricity savings while remaining cost effective. Also, we wanted to review the very latest experiences with innovative program approaches -- approaches that might prove useful to utilities as they scale up their C LM activities. Specific objectives of this phase of the study are threefold: (1) To disseminate information on utility C LM experience to a nationwide audience. (2) To review current New York State utility programs and make suggestions on how these programs can be improved. (3) To collect data for the final phase of the American Council for an Energy-Efficient Economy/New York State Energy Research and Development Authority project, which will examine the savings that are achievable if C LM programs are pushed to the limit'' of current knowledge on how to structure and run cost-effective C LM programs. 19 tabs.

  13. Energy conservation prospects through electric load management

    Energy Technology Data Exchange (ETDEWEB)

    El-Shirbeeny, E H.T.

    1984-04-01

    In this paper, concepts of electric load management are discussed for effective energy conservation. It is shown that the conservation program must be comprehensive to provide solutions to the problems facing the electric consumer, the electric utility and the society by reducing the rate of growth of energy consumption and power system peak demand requirements. The impact of energy management programs on electric energy conservation is examined, with emphasis on efficiency, storage, cogeneration and controls with computers.

  14. Environmental Aspects of Load Management

    International Nuclear Information System (INIS)

    Abaravicius, Juozas

    2004-02-01

    This study approaches load management from an environmental perspective. It identifies and discusses the possible environmental benefits of load management and evaluates their significance, primary focusing on CO 2 emissions reduction. The analysis is carried out on two levels: national - the Swedish electricity market, and local - one electric utility in southern Sweden. Our results show the importance of considering the influence of site-specific or level-specific conditions on the environmental effects of load management. On the national level, load management measures can hardly provide significant environmental benefits, due to the high hydropower production in Sweden, which is the demand following production source. Emission reductions will rather be the result of energy efficiency measures, which will cut the load demand as well as the energy demand. However, when it comes to a local (utility) level, where load management is considered as an alternative to an installation of peak diesel power plant, the benefits are clear. It is demonstrated that significant CO 2 emissions savings can be achieved due to avoided peak diesel power production

  15. Collectively loading programs in a multiple program multiple data environment

    Science.gov (United States)

    Aho, Michael E.; Attinella, John E.; Gooding, Thomas M.; Gooding, Thomas M.; Miller, Samuel J.

    2016-11-08

    Techniques are disclosed for loading programs efficiently in a parallel computing system. In one embodiment, nodes of the parallel computing system receive a load description file which indicates, for each program of a multiple program multiple data (MPMD) job, nodes which are to load the program. The nodes determine, using collective operations, a total number of programs to load and a number of programs to load in parallel. The nodes further generate a class route for each program to be loaded in parallel, where the class route generated for a particular program includes only those nodes on which the program needs to be loaded. For each class route, a node is selected using a collective operation to be a load leader which accesses a file system to load the program associated with a class route and broadcasts the program via the class route to other nodes which require the program.

  16. Box-triangular multiobjective linear programs for resource allocation with application to load management and energy market problems

    International Nuclear Information System (INIS)

    Ekel, P.Y.; Galperin, E.A.

    2003-01-01

    Models for multicriteria resource allocation are constructed with the specific box-triangular structure of a feasible region. The method of balance set equations is extended for the satisfaction level representation of the cost function space including the case of linearly dependent cost functions. On this basis, different goal criteria on the balance set are investigated for linear cases. Procedures for determining the balance set and finding goal-optimal Pareto solutions are illustrated on examples. The results of the paper are of universal character and can find wide applications in allocating diverse types of resources on the multiobjective basis in planning and control of complex systems including load management and energy market problems. (Author)

  17. Load power device, system and method of load control and management employing load identification

    Science.gov (United States)

    Yang, Yi; Luebke, Charles John; Schoepf, Thomas J.

    2018-01-09

    A load power device includes a power input, at least one power output for at least one load, a plurality of sensors structured to sense voltage and current at the at least one power output, and a processor. The processor provides: (a) load identification based upon the sensed voltage and current, and (b) load control and management based upon the load identification.

  18. Assessment of dissolved-selenium concentrations and loads in the lower Gunnison River Basin, Colorado, as part of the Selenium Management Program, from 2011 to 2016

    Science.gov (United States)

    Henneberg, Mark F.

    2018-04-23

    The Gunnison Basin Selenium Management Program implemented a water-quality monitoring network in 2011 in the lower Gunnison River Basin in Colorado. Selenium is a trace element that bioaccumulates in aquatic food chains and can cause reproductive failure, deformities, and other harmful effects. This report presents the percentile values of selenium because regulatory agencies in Colorado make decisions based on the U.S. Environmental Protection Agency (EPA) Clean Water Act Section 303(d) that uses percentile values of concentration. Also presented are dissolved-selenium loads at 18 sites in the lower Gunnison River Basin for water years (WYs) 2011–2016 (October 1, 2010, through September 30, 2016). Annual dissolved-selenium loads were calculated for five sites with continuous U.S. Geological Survey (USGS) streamflow-gaging stations. Annual dissolved-selenium loads for WY 2011 through WY 2016 ranged from 179 and 391 pounds (lb) at Uncompahgre River at Colona to 11,100 and 17,300 lb at Gunnison River near Grand Junction (herein called Whitewater), respectively. Instantaneous loads were calculated for five sites with continuous U.S. Geological Survey (USGS) streamflow-gaging stations and 13 ancillary sites where discrete water-quality sampling also took place, using discrete water-quality samples and the associated discharge measurements collected during the period. Median instantaneous loads ranged from 0.01 pound per day (lb/d) at Smith Fork near Lazear to 33.0 lb/d at Whitewater. Mean instantaneous loads ranged from 0.06 lb/d at Smith Fork near Lazear to 36.2 lb/d at Whitewater. Most tributary sites in the basin had a median instantaneous dissolved-selenium load of less than 20.0 lb/day. In general, dissolved-selenium loads at Gunnison River main-stem sites showed an increase from upstream to downstream. The State of Colorado water-quality standard for dissolved selenium of 4.6 micrograms per liter (µg/L) was compared to the 85th percentiles for dissolved

  19. Probabilistic Load Models for Simulating the Impact of Load Management

    DEFF Research Database (Denmark)

    Chen, Peiyuan; Bak-Jensen, Birgitte; Chen, Zhe

    2009-01-01

    . It is concluded that the AR(12) model is favored with limited measurement data and that the joint-normal model may provide better results with a large data set. Both models can be applied in general to model load time series and used in time-sequential simulation of distribution system planning.......This paper analyzes a distribution system load time series through autocorrelation coefficient, power spectral density, probabilistic distribution and quantile value. Two probabilistic load models, i.e. the joint-normal model and the autoregressive model of order 12 (AR(12)), are proposed...... to simulate the impact of load management. The joint-normal model is superior in modeling the tail region of the hourly load distribution and implementing the change of hourly standard deviation. Whereas the AR(12) model requires much less parameter and is superior in modeling the autocorrelation...

  20. Tribal Waste Management Program

    Science.gov (United States)

    The EPA’s Tribal Waste Management Program encourages environmentally sound waste management practices that promote resource conservation through recycling, recovery, reduction, clean up, and elimination of waste.

  1. Load building versus conservation as demand-side management objectives

    International Nuclear Information System (INIS)

    Kexel, D.T.

    1994-01-01

    This paper examines the economics of load building versus conservation as demand-side management objectives. Economic criteria to be used in evaluating each type of program from the perspectives of all impacted parties are provided. The impact of DSM programs on electric rates is shown to be a key focal point of a thorough evaluation

  2. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  3. Controllable Load Management Approaches in Smart Grids

    Directory of Open Access Journals (Sweden)

    Jingshuang Shen

    2015-10-01

    Full Text Available With rapid smart grid technology development, the customer can actively participate in demand-side management (DSM with the mutual information communication between the distributor operation company and the smart devices in real-time. Controllable load management not only has the advantage of peak shaving, load balance, frequency regulation, and voltage stability, but is also effective at providing fast balancing services to the renewable energy grid in the distributed power system. The load management faces an enormous challenge as the customer has a large number of both small residential loads and dispersed renewable sources. In this paper, various controllable load management approaches are discussed. The traditional controllable load approaches such as the end users’ controllable appliances, storage battery, Vehicle-to-Grid (V2G, and heat storage are reviewed. The “broad controllable loads” management, such as the microgrid, Virtual Power Plant (VPP, and the load aggregator are also presented. Furthermore, the load characteristics, control strategies, and control effectiveness are analyzed.

  4. Electricity Crisis and Load Management in Bangladesh

    Directory of Open Access Journals (Sweden)

    Rajib Kanti Das

    2012-09-01

    Full Text Available Bangladesh is a densely populated country. Only a small part of her area is electrified which cover around 18% of total population. The people who are in the electrified area are suffering from severe load shedding. A systematic load management procedure related to demand side may improve the situation is the research problem. The major objectives serve by the research are to analyze contemporary electricity status with a view to drawing inference about demand supply gap and extracting benefits from load management. Data supplied by the Bangladesh Power Development Board, World Bank and outcome of survey are analyzed with some simple statistical tools to test the hypothesis. Analysis discloses that with properly managed uses of electricity with load switch and rotation week-end can improve the concurrent condition of electricity. Moreover, introducing smart distribution system, reducing system loss, shifting load to off-peak, large scale use of prepaid mete, observing energy week and using energy efficient home and office appliance are recommended to improve load through demand side management. Some other recommendations such as introducing alternative energy, public private partnership and using renewable energy development and producing energy locally are made for load management from the supply side.

  5. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  6. French plutonium management program

    International Nuclear Information System (INIS)

    Greneche, D.

    2002-01-01

    The French plutonium management program is summarized in this paper. The program considers nuclear generation as a major component of national electric power supply and includes the reprocessing of the spent fuel. (author)

  7. Unstable slope management program.

    Science.gov (United States)

    2009-08-01

    This Rapid Response Project gathered information on existing unstable slope management programs, with a : focus on asset management practices in the United States and overseas. On the basis of this study, the research : team summarized and recommende...

  8. Program Management System manual

    International Nuclear Information System (INIS)

    1986-01-01

    The Program Management System (PMS), as detailed in this manual, consists of all the plans, policies, procedure, systems, and processes that, taken together, serve as a mechanism for managing the various subprograms and program elements in a cohesive, cost-effective manner. The PMS is consistent with the requirements of the Nuclear Waste Policy Act of 1982 and the ''Mission Plan for the Civilian Radioactive Waste Management Program'' (DOE/RW-0005). It is based on, but goes beyond, the Department of Energy (DOE) management policies and procedures applicable to all DOE programs by adapting these directives to the specific needs of the Civilian Radioactive Waste Management program. This PMS Manual describes the hierarchy of plans required to develop and maintain the cost, schedule, and technical baselines at the various organizational levels of the Civilian Radioactive Waste Management Program. It also establishes the management policies and procedures used in the implementation of the Program. These include requirements for internal reports, data, and other information; systems engineering management; regulatory compliance; safety; quality assurance; and institutional affairs. Although expanded versions of many of these plans, policies, and procedures are found in separate documents, they are an integral part of this manual. The PMS provides the basis for the effective management that is needed to ensure that the Civilian Radioactive Waste Management Program fulfills the mandate of the Nuclear Waste Policy Act of 1982. 5 figs., 2 tabs

  9. Program management system manual

    International Nuclear Information System (INIS)

    1989-08-01

    OCRWM has developed a program management system (PMS) to assist in organizing, planning, directing and controlling the Civilian Radioactive Waste Management Program. A well defined management system is necessary because: (1) the Program is a complex technical undertaking with a large number of participants, (2) the disposal and storage facilities to be developed by the Program must be licensed by the Nuclear Regulatory Commission (NRC) and hence are subject to rigorous quality assurance (QA) requirements, (3) the legislation mandating the Program creates a dichotomy between demanding schedules of performance and a requirement for close and continuous consultation and cooperation with external entities, (4) the various elements of the Program must be managed as parts of an integrated waste management system, (5) the Program has an estimated total system life cycle cost of over $30 billion, and (6) the Program has a unique fiduciary responsibility to the owners and generators of the nuclear waste for controlling costs and minimizing the user fees paid into the Nuclear Waste Fund. This PMS Manual is designed and structured to facilitate strong, effective Program management by providing policies and requirements for organizing, planning, directing and controlling the major Program functions

  10. Load Management in District Heating Operation

    OpenAIRE

    Li, Hongwei; Wang, Stephen Jia

    2015-01-01

    Smooth operation of district heating system will avoid installation of expensive peak heat boilers, improve plant partial load performance, increase the system redundancy for further network expansion and improve its resilience to ensuresecurity of supply during severe heating seasons. The peak heating load can be reduced through building demand side management. The building thermal mass can be used to shift the heating supply under the circumstance withoutjeopardizing the consumer thermal co...

  11. Handbook of five methodologies for the assessment of load management

    Energy Technology Data Exchange (ETDEWEB)

    1980-02-01

    This report provides a summary description and evaluation of five methodologies that have been developed for the assessment of utility costs and benefits of load-management programs, including marginal-costing methodologies and an integrated set of utility-system planning and production costing models. Of the two basic methods, the first uses marginal-cost data to compute the cumulative reduction in utility-system costs realized in moving units of load from periods of high marginal cost to periods of low marginal cost. The present value of these cost savings may be compared directly with the costs of implementing the load-management program. The second method relies on an evaluation of future total-system costs. System planning and production-costing models are used to calculate the total fixed and variable costs of meeting baseline and alternative-load configurations. The difference between baseline system costs and the costs with load management may then be compared to the costs of implementing the program. The advantages and disadvantages of each method are summarized briefly.

  12. Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Coobs, J.H.

    1983-01-01

    This is the second of two programs that are concerned with the management of surplus facilities. The facilities in this program are those related to commercial activities, which include the three surplus experimental and test reactors [(MSRE, HRE-2, and the Low Intensity Test Reactor (LITR)] and seven experimental loops at the ORR. The program is an integral part of the Surplus Facilities Management Program, which is a national program administered for DOE by the Richland Operations Office. Very briefly reported here are routine surveillance and maintenance of surplus radioactively contaminated DOE facilities awaiting decommissioning

  13. Knowledge management program

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, T. [CANDU Owners' Group, Toronto, Ontario (Canada)

    2013-07-01

    To capture and retain the CANDU experience from a wider CANDU base and transfer knowledge and experience to our members, supplier participants and universities in a cost effective manner. Major focus area of the program is knowledge management joint projects, generic training delivery, inter-utilities mentoring and technical support, public education programs. The path forward is execution of transition of OPG NPDS Program as an ongoing program in COG with member funding, pursue opportunities to provide member utilities with additional leadership and train-the-trainer training and grow the knowledge management activities by 20% per year based on 2013/2014 results.

  14. Knowledge management program

    International Nuclear Information System (INIS)

    Henderson, T.

    2013-01-01

    To capture and retain the CANDU experience from a wider CANDU base and transfer knowledge and experience to our members, supplier participants and universities in a cost effective manner. Major focus area of the program is knowledge management joint projects, generic training delivery, inter-utilities mentoring and technical support, public education programs. The path forward is execution of transition of OPG NPDS Program as an ongoing program in COG with member funding, pursue opportunities to provide member utilities with additional leadership and train-the-trainer training and grow the knowledge management activities by 20% per year based on 2013/2014 results.

  15. Managing a Behavioral Management Program

    DEFF Research Database (Denmark)

    Schapiro, Steve; Lambeth, Susan P.

    2017-01-01

    The behavioral management of captive nonhuman primates (NHPs) can be significantly enhanced through synergistic relationships with noninvasive research projects. Many behavioral and cognitive research procedures are challenging and enriching (physically, cognitively, and/or socially......) for the animals (Hopper et al. 2016; Hopkins and Latzman 2017) without involving any invasive (surgical, biopsy, etc.) procedures. Noninvasive behavioral research programs present the primates with opportunities to choose to voluntarily participate (or not), providing them with greater control over...

  16. Program Management Tool

    Science.gov (United States)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity

  17. Load Management in District Heating Operation

    DEFF Research Database (Denmark)

    Li, Hongwei; Wang, Stephen Jia

    2015-01-01

    Smooth operation of district heating system will avoid installation of expensive peak heat boilers, improve plant partial load performance, increase the system redundancy for further network expansion and improve its resilience to ensure security of supply during severe heating seasons. The peak...... heating load can be reduced through building demand side management. The building thermal mass can be used to shift the heating supply under the circumstance without jeopardizing the consumer thermal comfort. In this paper, the multi-agent framework is applied to a simplified building dynamic model...

  18. Configuration management and load monitoring procedures for nuclear plant structures

    International Nuclear Information System (INIS)

    Chu, S.L.; Skaczylo, A.T.

    1990-01-01

    This paper describes a computer-aided engineering tool called the Load Monitoring System (LMS) that was proven effective for monitoring floor framing, loads, and structural integrity. The system links structural analysis, design investigation, and reporting and automated drafting programs with a Data Base Management System (DBMS). It provides design engineers with a powerful tool for quickly incorporating, tracking, and assessing load revisions and determining effects on steel floor framing members and connections, thereby helping to reduce design man-hours, minimize the impact of structural modifications, and maintain and document the design baseline. The major benefit to utilities are the reduction in engineering costs, assistance with plant configuration management, and assurance of structural safety throughout the operating life of a nuclear plant and at evaluation for license renewal. (orig./HP)

  19. The standard for program management

    CERN Document Server

    2017-01-01

    The Standard for Program Management – Fourth Edition differs from prior editions by focusing on the principles of good program management. Program activities have been realigned to program lifecycle phases rather than topics, and the first section was expanded to address the key roles of program manager, program sponsor and program management office. It has also been updated to better align with PMI’s Governance of Portfolios, Programs, and Projects: A Practice Guide.

  20. Quality Management Program

    International Nuclear Information System (INIS)

    1991-10-01

    According to section 35.32, ''Quality Management Program,'' of 10 CFR Part 35, ''Medical Use of Byproduct Material,'' applicants or licensees, as applicable, are required to establish a quality management (QM) program. This regulatory guide provides guidance to licensees and applicants for developing policies and procedures for the QM program. This guide does not restrict or limit the licensee from using other guidance that may be equally useful in developing a QM program, e.g., information available from the Joint Commission on Accreditation of Healthcare Organizations or the American College of Radiology. Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR Part 35, which provides the regulatory basis for this guide. This information collection requirements in 10 CFR Part 35 have been cleared under OMB Clearance No. 3150-0010

  1. NPS TINYSCOPE program management

    OpenAIRE

    Turner, Christopher Gordon.

    2010-01-01

    Approved for public release; distribution is unlimited This master's thesis introduces the program management and concept of operations of the TINYSCOPE Program. TINYSCOPE is a 6U CubeSat designed as a low-cost and easily replaceable imaging spacecraft that can produce tactically relevant imagery data. Tactical requirements in this context would emphasize "good enough" image resolution with a rapid-response tasking loop and high revisit rate. The TINYSCOPE project intends to demonstra...

  2. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  3. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  4. Russia air management program

    Energy Technology Data Exchange (ETDEWEB)

    Pace, T.G. [U.S. Environmental Protection Agency, NC (United States); Markin, S. [Ministry of Environmental Protection and Natural Resources, Moscow (Sweden); Kosenkova, S.V. [Volgograd Environmental Services Administration, Volgograd (Russian Federation)

    1995-12-31

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  5. Russia air management program

    International Nuclear Information System (INIS)

    Pace, T.G.; Markin, S.; Kosenkova, S.V.

    1995-01-01

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  6. Russia air management program

    Energy Technology Data Exchange (ETDEWEB)

    Pace, T G [U.S. Environmental Protection Agency, NC (United States); Markin, S [Ministry of Environmental Protection and Natural Resources, Moscow (Sweden); Kosenkova, S V [Volgograd Environmental Services Administration, Volgograd (Russian Federation)

    1996-12-31

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  7. Demand Side Management: An approach to peak load smoothing

    Science.gov (United States)

    Gupta, Prachi

    A preliminary national-level analysis was conducted to determine whether Demand Side Management (DSM) programs introduced by electric utilities since 1992 have made any progress towards their stated goal of reducing peak load demand. Estimates implied that DSM has a very small effect on peak load reduction and there is substantial regional and end-user variability. A limited scholarly literature on DSM also provides evidence in support of a positive effect of demand response programs. Yet, none of these studies examine the question of how DSM affects peak load at the micro-level by influencing end-users' response to prices. After nearly three decades of experience with DSM, controversy remains over how effective these programs have been. This dissertation considers regional analyses that explore both demand-side solutions and supply-side interventions. On the demand side, models are estimated to provide in-depth evidence of end-user consumption patterns for each North American Electric Reliability Corporation (NERC) region, helping to identify sectors in regions that have made a substantial contribution to peak load reduction. The empirical evidence supports the initial hypothesis that there is substantial regional and end-user variability of reductions in peak demand. These results are quite robust in rapidly-urbanizing regions, where air conditioning and lighting load is substantially higher, and regions where the summer peak is more pronounced than the winter peak. It is also evident from the regional experiences that active government involvement, as shaped by state regulations in the last few years, has been successful in promoting DSM programs, and perhaps for the same reason we witness an uptick in peak load reductions in the years 2008 and 2009. On the supply side, we estimate the effectiveness of DSM programs by analyzing the growth of capacity margin with the introduction of DSM programs. The results indicate that DSM has been successful in offsetting the

  8. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  9. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  10. Load management in electrical networks. Objectives, methods, prospects

    International Nuclear Information System (INIS)

    Gabioud, D.

    2008-01-01

    This illustrated article takes up the problems related to the variation of the load in electricity networks. How to handle the peak load? Different solutions in the energy demand management are discussed. Method based on the price, method based on the reduction of the load by electric utilities. Information systems are presented which gives the consumer the needed data to participate in the local load management.

  11. Load management through agent based coordination of flexible electricity consumers

    DEFF Research Database (Denmark)

    Clausen, Anders; Demazeau, Yves; Jørgensen, Bo Nørregaard

    2015-01-01

    Demand Response (DR) offers a cost-effective and carbonfriendly way of performing load balancing. DR describes a change in the electricity consumption of flexible consumers in response to the supply situation. In DR, flexible consumers may perform their own load balancing through load management...

  12. Modeling and Analysis of Commercial Building Electrical Loads for Demand Side Management

    Science.gov (United States)

    Berardino, Jonathan

    In recent years there has been a push in the electric power industry for more customer involvement in the electricity markets. Traditionally the end user has played a passive role in the planning and operation of the power grid. However, many energy markets have begun opening up opportunities to consumers who wish to commit a certain amount of their electrical load under various demand side management programs. The potential benefits of more demand participation include reduced operating costs and new revenue opportunities for the consumer, as well as more reliable and secure operations for the utilities. The management of these load resources creates challenges and opportunities to the end user that were not present in previous market structures. This work examines the behavior of commercial-type building electrical loads and their capacity for supporting demand side management actions. This work is motivated by the need for accurate and dynamic tools to aid in the advancement of demand side operations. A dynamic load model is proposed for capturing the response of controllable building loads. Building-specific load forecasting techniques are developed, with particular focus paid to the integration of building management system (BMS) information. These approaches are tested using Drexel University building data. The application of building-specific load forecasts and dynamic load modeling to the optimal scheduling of multi-building systems in the energy market is proposed. Sources of potential load uncertainty are introduced in the proposed energy management problem formulation in order to investigate the impact on the resulting load schedule.

  13. Reservoir Engineering Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Howard, J.H.; Schwarz, W.J.

    1977-12-14

    The Reservoir Engineering Management Program being conducted at Lawrence Berkeley Laboratory includes two major tasks: 1) the continuation of support to geothermal reservoir engineering related work, started under the NSF-RANN program and transferred to ERDA at the time of its formation; 2) the development and subsequent implementation of a broad plan for support of research in topics related to the exploitation of geothermal reservoirs. This plan is now known as the GREMP plan. Both the NSF-RANN legacies and GREMP are in direct support of the DOE/DGE mission in general and the goals of the Resource and Technology/Resource Exploitation and Assessment Branch in particular. These goals are to determine the magnitude and distribution of geothermal resources and reduce risk in their exploitation through improved understanding of generically different reservoir types. These goals are to be accomplished by: 1) the creation of a large data base about geothermal reservoirs, 2) improved tools and methods for gathering data on geothermal reservoirs, and 3) modeling of reservoirs and utilization options. The NSF legacies are more research and training oriented, and the GREMP is geared primarily to the practical development of the geothermal reservoirs. 2 tabs., 3 figs.

  14. Residential Load Manageability Factor Analyses by Load Sensitivity Affected by Temperature

    Directory of Open Access Journals (Sweden)

    N. Eskandari

    2016-12-01

    Full Text Available Load side management is the basic and significant principle to keeping the balance between generation side and consumption side of electrical power energy. Load side management on typical medium voltage feeder is the power energy consumption control of connected loads with variation of essential parameters that loads do reaction to their variation. Knowing amount of load's reaction to each parameters variation in typical medium voltage feeder during the day, leads to gain Load Manageability Factor (LMF for that specific feeder that helps power utilities to manage their connected loads. Calculating this LMF needs to find out each types of load with unique inherent features behavior to each parameters variation. This paper results and future work results will help us to catch mentioned LMF. In this paper analysis of residential load behavior due to temperature variation with training artificial neural network will be done. Load behavior due to other essential parameters variations like energy pricing variation, major event happening, and power utility announcing to the customers, and etc will study in future works. Collecting all related works results in a unit mathematical equation or an artificial neural network will gain LMF.

  15. DEFENSE PROGRAMS RISK MANAGEMENT FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2012-01-01

    Full Text Available For the past years defense programs have faced delays in delivering defense capabilities and budget overruns. Stakeholders are looking for ways to improve program management and the decision making process given the very fluid and uncertain economic and political environment. Consequently, they have increasingly resorted to risk management as the main management tool for achieving defense programs objectives and for delivering the defense capabilities strongly needed for the soldiers on the ground on time and within limited defense budgets. Following a risk management based decision-making approach the stakeholders are expected not only to protect program objectives against a wide range of risks but, at the same time, to take advantage of the opportunities to increase the likelihood of program success. The prerequisite for making risk management the main tool for achieving defense programs objectives is the design and implementation of a strong risk management framework as a foundation providing an efficient and effective application of the best risk management practices. The aim of this paper is to examine the risk management framework for defense programs based on the ISO 31000:2009 standard, best risk management practices and the defense programs’ needs and particularities. For the purposes of this article, the term of defense programs refers to joint defense programs.

  16. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    Energy Technology Data Exchange (ETDEWEB)

    GARVIN, L. J.; JENSEN, M. A.

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  17. Designing an application for managing distribution transformer load

    Directory of Open Access Journals (Sweden)

    Olga Liliana Sánchez

    2006-09-01

    Full Text Available This paper presents a software application for distribution transformer load management and calculating the elec- tricity distribution network service quality index (i.e. EDS and EFS indexes. Transformer operation state, calculating core and coil losses and selecting distribution transformers based on technical-economic criteria using daily-load curves are the load management strategies presented here. The application consists of a programme allowing to data acquisition input, an Excel-based spread-sheet having the equations for calculating load management data and a user-interface presenting the load management application’s results. The application was validated by technical-economic evaluation of three distribution transformers when supplying demand.

  18. Load monitoring program: Status and results report. Volume 1: Summary

    International Nuclear Information System (INIS)

    1994-06-01

    British Columbia Hydro conducts a monitoring program to provide information on customer needs and values for planning; to measure customer response, energy savings impacts, and load shape impacts due to changes in rate level, rate restructuring, and Power Smart programs; to estimate end-use consumption and load shapes by customer class; and to provide load information for distribution and system load studies. To achieve these objectives, the monitoring program tracks the characteristics and energy use patterns of a sample of BC Hydro residential, commercial, and industrial customers over a period of several years. The entire sample will be surveyed periodically to obtain information on changes in building characteristics, equipment stocks, and energy-use behavior and attitudes. A report is provided on the status of monitoring program activities and some results obtained in 1993/94. For the residential sector, the results include typical load profiles, end-user demographics, and extent of electric space heating and water heating. In the commercial sector, customers were divided into two main groups. The large-building group was relatively well organized in terms of energy needs and participated in Power Smart programs. The small-building group was relatively energy-inefficient and relatively unaware of Power Smart programs. 43 figs., 15 tabs

  19. GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION.

    Energy Technology Data Exchange (ETDEWEB)

    PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.; GOODE,G.A.; LEE,R.J.; KLAUS,K.; HOWE,R.F.; GEIGER,K.

    2002-05-31

    THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

  20. Do 'enabling technologies' affect customer performance in price-responsive load programs?

    International Nuclear Information System (INIS)

    Goldman, Charles A.; Kintner-Meyer, Michael; Heffner, Grayson

    2002-01-01

    Price-responsive load (PRL) programs vary significantly in overall design, the complexity of relationships between program administrators, load aggregators, and customers, and the availability of ''enabling technologies''. Enabling technologies include such features as web-based power system and price monitoring, control and dispatch of curtailable loads, communications and information systems links to program participants, availability of interval metering data to customers in near real time, and building/facility/end-use automation and management capabilities. Two state agencies - NYSERDA in New York and the CEC in California - have been conspicuous leaders in the demonstration of demand response (DR) programs utilizing enabling technologies. In partnership with key stakeholders in these two states (e.g., grid operator, state energy agencies, and program administrators), Lawrence Berkeley National Laboratory (LBNL) and Pacific Northwest National Laboratory (PNNL) surveyed 56 customers who worked with five contractors participating in CEC or NYSERDA-sponsored DR programs. We combined market research and actual load curtailment data when available (i.e., New York) or customer load reduction targets in order to explore the relative importance of contractor's program design features, sophistication of control strategies, and reliance on enabling technologies in predicting customer's ability to deliver load reductions in DR programs targeted to large commercial/industrial customers. We found preliminary evidence that DR enabling technology has a positive effect on load curtailment potential. Many customers indicated that web-based energy information tools were useful for facilitating demand response (e.g., assessing actual performance compared to load reduction contract commitments), that multiple notification channels facilitated timely response, and that support for and use of backup generation allowed customers to achieve significant and predictable load

  1. Strategic management of population programs

    OpenAIRE

    Bernhart, Michael H.

    1992-01-01

    Formal strategic planning and management appear to contribute to organizational effectiveness. The author surveys the literature on strategic management in private/for-profit organizations and applies lessons from that literature to population programs. Few would argue that population programs would not benefit from strategic planning and management, but it would be inadvisable to initiate the process when the organization is faced with a short-term crisis; during or immediately before a chan...

  2. 14 CFR 91.1017 - Amending program manager's management specifications.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Amending program manager's management... Ownership Operations Program Management § 91.1017 Amending program manager's management specifications. (a... specifications; or (2) The program manager applies for the amendment of any management specifications, and the...

  3. Load management for refrigeration systems: Potentials and barriers

    Energy Technology Data Exchange (ETDEWEB)

    Grein, Arne, E-mail: a.grein@tu-berlin.de [University of Technology Berlin, Institute for Energy Technology, Department of Energy Systems, Einsteinufer 25 (TA8), 10587 Berlin (Germany); Pehnt, Martin [Institute for Energy and Environmental Research Heidelberg (ifeu), Wilckensstr. 3, 69120 Heidelberg (Germany)

    2011-09-15

    As a strategy to deal with the increasing intermittent input of renewable energy sources in Germany, the adaptation of power consumption is complementary to power-plant regulation, grid expansion and physical energy storage. One demand sector that promises strong returns for load management efforts is cooling and refrigeration. In these processes, thermal inertia provides a temporal buffer for shifting and adjusting the power consumption of cooling systems. We have conducted an empirical investigation to obtain a detailed and time-resolved bottom-up analysis of load management for refrigeration systems in the city of Mannheim, Germany. We have extrapolated our results to general conditions in Germany. Several barriers inhibit the rapid adoption of load management strategies for cooling systems, including informational barriers, strict compliance with legal cooling requirements, liability issues, lack of technical experience, an inadequate rate of return and organizational barriers. Small commercial applications of refrigeration in the food-retailing and cold storage in hotels and restaurants are particularly promising starting points for intelligent load management. When our results are applied to Germany, suitable sectors for load management have theoretical and achievable potential values of 4.2 and 2.8 GW, respectively, amounting to about 4-6% of the maximum power demand in Germany. - Highlights: > Potential and barriers for implementation of load shifting for refrigeration. > Empirical investigation for time-resolved bottom-up analysis in Mannheim, Germany. > Suitable sectors and further recommendations for introducing load management.> Extrapolation of results from local to national level.

  4. Groundwater pumping effects on contaminant loading management in agricultural regions.

    Science.gov (United States)

    Park, Dong Kyu; Bae, Gwang-Ok; Kim, Seong-Kyun; Lee, Kang-Kun

    2014-06-15

    Groundwater pumping changes the behavior of subsurface water, including the location of the water table and characteristics of the flow system, and eventually affects the fate of contaminants, such as nitrate from agricultural fertilizers. The objectives of this study were to demonstrate the importance of considering the existing pumping conditions for contaminant loading management and to develop a management model to obtain a contaminant loading design more appropriate and practical for agricultural regions where groundwater pumping is common. Results from this study found that optimal designs for contaminant loading could be determined differently when the existing pumping conditions were considered. This study also showed that prediction of contamination and contaminant loading management without considering pumping activities might be unrealistic. Motivated by these results, a management model optimizing the permissible on-ground contaminant loading mass together with pumping rates was developed and applied to field investigation and monitoring data from Icheon, Korea. The analytical solution for 1-D unsaturated solute transport was integrated with the 3-D saturated solute transport model in order to approximate the fate of contaminants loaded periodically from on-ground sources. This model was further expanded to manage agricultural contaminant loading in regions where groundwater extraction tends to be concentrated in a specific period of time, such as during the rice-growing season, using a method that approximates contaminant leaching to a fluctuating water table. The results illustrated that the simultaneous management of groundwater quantity and quality was effective and appropriate to the agricultural contaminant loading management and the model developed in this study, which can consider time-variant pumping, could be used to accurately estimate and to reasonably manage contaminant loading in agricultural areas. Copyright © 2014 Elsevier Ltd. All

  5. Practical load management - Peak shaving using photovoltaics

    International Nuclear Information System (INIS)

    Berger, W.

    2009-01-01

    This article takes a look at how photovoltaic (PV) power generation can be used in a practical way to meet peak demands for electricity. Advice is provided on how photovoltaics can provide peak load 'shaving' through the correlation between its production and the peak loads encountered during the day. The situation regarding feed-in tariffs in Italy is discussed, as are further examples of installations in Germany and Austria. Further, an initiative of the American Southern California Edison utility is discussed which foresees the installation of large PV plant on the roofs of commercial premises to provide local generation of peak energy and thus relieve demands on their power transportation network.

  6. Local load management system and intermittent power on the grid

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The project relates to the UK's obligations on renewable energy sources. The objectives were (i) to identify contractual requirements and commercial benefits of load management under the UK's Renewable Obligation and electric power trading arrangements (ii) through modelling, demonstrate the benefits of load management to major customers operating on-site wind generators; (iii) to develop a low-cost load management system incorporating communication technologies and switching devices and (iv) to identify the social and psychological aspects of load management. The demonstration of the load management system was conducted on the Findhorn Foundation's low voltage electric power distribution network and a 75kw wind turbine. The project demonstrated suitable technology for distributed load management on a grid-connected system in order to optimize the renewable energy generated on site, and the analyses identified several areas where grid-connected management can provide financial benefits. There is much scope for exploitation of commercial opportunities. The work was conducted by Econnect Ltd under contract to the DTI.

  7. Communicating Risk to Program Managers

    Science.gov (United States)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  8. Environmental Management Science Program Workshop

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  9. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  10. Transit management certificate program.

    Science.gov (United States)

    2012-07-01

    TTI worked closely with the Landscape Architecture and Urban Planning Department : (LAUP) of Texas A&M University (TAMU) to develop a transit management certificate : focus for the current Graduate Certificate in Transportation Planning (CTP) housed ...

  11. Federal Energy Management Program Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-05

    Brochure offers an overview of the Federal Energy Management Program (FEMP), which provides agencies and organizations with the information, tools, and assistance they need to achieve their energy-related requirements and goals through specialized initiatives.

  12. Load curve modelling of the residential segment electric power consumption applying a demand side energy management program; Modelagem da curva de carga das faixas de consumo de energia eletrica residencial a partir da aplicacao de um programa de gerenciamento de energia pelo lado da demanda

    Energy Technology Data Exchange (ETDEWEB)

    Rahde, Sergio Barbosa [Pontificia Univ. Catolica do Rio Grande do Sul, Porto Alegre (Brazil). Dept. de Engenharia Mecanica e Mecatronica]. E-mail: sergio@em.pucrs.br; Kaehler, Jose Wagner [Pontificia Univ. Catolica do Rio Grande do Sul, Porto Alegre (Brazil). Faculdade de Engenharia]. E-mail: kaehlerjw@pucrs.br

    2000-07-01

    The dissertation aims to offer a current vision on the use of electrical energy inside CEEE's newly defined area of operation. It also intends to propose different alternatives to set up a Demand Side Management (DSM) project to be carried out on the same market segment, through a Residential Load Management program. Starting from studies developed by DNAEE (the Brazilian federal government's agency for electrical energy), to establish the load curve characteristics, as well as from a research on electrical equipment ownership and electricity consumption habits, along with the contribution supplied by other utilities, especially in the US, an evaluation is offered, concerning several approaches to residential energy management, setting up conditions that simulate the residential segment's scenarios and their influence on the general system's load. (author)

  13. Normal loads program for aerodynamic lifting surface theory. [evaluation of spanwise and chordwise loading distributions

    Science.gov (United States)

    Medan, R. T.; Ray, K. S.

    1974-01-01

    A description of and users manual are presented for a U.S.A. FORTRAN 4 computer program which evaluates spanwise and chordwise loading distributions, lift coefficient, pitching moment coefficient, and other stability derivatives for thin wings in linearized, steady, subsonic flow. The program is based on a kernel function method lifting surface theory and is applicable to a large class of planforms including asymmetrical ones and ones with mixed straight and curved edges.

  14. Asset management program

    International Nuclear Information System (INIS)

    Wison, P.; Newman, G.

    2013-01-01

    In order to understand our assets we have been assessing the condition of the units in our nuclear power plants developing asset life management options on a component by component basis. We have concluded that with the right work and planning we will be able to manage the units in a way that balances capacity requirements over the long term and at the same time manage the demand on critical resources. Major component replacement outages include Installing/removing bulkheads, pressure tube and calandria tube replacement, feeder replacement, steam generator replacement, supporting facilities and infrastructure, reactor inspections and maintenance including tooling enhancements, additional non reactor systems inspection & testing and continued research and analysis. These plans will have to take into account cost, resource and capacity requirements.

  15. NPP Krsko Aging Management Program

    International Nuclear Information System (INIS)

    Glaser, B.; Spiler, J.

    2002-01-01

    As a part of Periodic Safety Review Program (PSR) NEK will review and perform some activities related to Equipment Qualification (EQ) and Aging Management Program (AMP). (EQ) and AMP are safety factors, which need to be assessed during PSR. The goal of PSR and AMP is to determine aging effects and give the conclusion whether the plant has been managed to control aging related degradations and that safety margins are maintained. The parallel goal is also to establish AMP for future plant operation and provide basis for possible Life Extension Program. NEK will develop NEK Aging and Life Cycle Management Program, similar by format and content to one determined by License Renewal program. The bases are in 10CFR54, and NEI 95-10 Industry Guidelines for 10 CFR 54 implementation. The process of establishment the AMP is to be done in two steps. The first step is dealing with SSC's (Systems Structures and Components) scoping and screening and identification of TLAA's (Time Limited Aging Analyses). That means, that a database of all SSC's and TLAA's will be created and then evaluated within AMP program. Based on the scope in first phase an evaluation will be performed in step two. NEK will maintain AMP program as a living program that may be also used for Life Extension and Life Cycle Management. This paper will present and describe AMP, scoping and screening process and the results achieved through the first phase of the project.(author)

  16. Recovery Act. Advanced Load Identification and Management for Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Yi [Eaton Corporation, Menomonee Falls, WI (United States); Casey, Patrick [Eaton Corporation, Menomonee Falls, WI (United States); Du, Liang [Eaton Corporation, Menomonee Falls, WI (United States); He, Dawei [Eaton Corporation, Menomonee Falls, WI (United States)

    2014-02-12

    In response to the U.S. Department of Energy (DoE)’s goal of achieving market ready, net-zero energy residential and commercial buildings by 2020 and 2025, Eaton partnered with the Department of Energy’s National Renewable Energy Laboratory (NREL) and Georgia Institute of Technology to develop an intelligent load identification and management technology enabled by a novel “smart power strip” to provide critical intelligence and information to improve the capability and functionality of building load analysis and building power management systems. Buildings account for 41% of the energy consumption in the United States, significantly more than either transportation or industrial. Within the building sector, plug loads account for a significant portion of energy consumption. Plug load consumes 15-20% of building energy on average. As building managers implement aggressive energy conservation measures, the proportion of plug load energy can increase to as much as 50% of building energy leaving plug loads as the largest remaining single source of energy consumption. This project focused on addressing plug-in load control and management to further improve building energy efficiency accomplished through effective load identification. The execution of the project falls into the following three major aspects; An intelligent load modeling, identification and prediction technology was developed to automatically determine the type, energy consumption, power quality, operation status and performance status of plug-in loads, using electric waveforms at a power outlet level. This project demonstrated the effectiveness of the developed technology through a large set of plug-in loads measurements and testing; A novel “Smart Power Strip (SPS) / Receptacle” prototype was developed to act as a vehicle to demonstrate the feasibility of load identification technology as a low-cost, embedded solution; and Market environment for plug-in load control and management solutions

  17. ERDA waste management program

    International Nuclear Information System (INIS)

    Kuhlman, C.W.

    1976-01-01

    The ERDA commercial waste program is summarized. It consists of three parts: terminal storage, processing, and preparation of the Generic Environmental Impact Statement. Emplacement in geologic formations is the best disposal method for high-level waste; migration would be essentially zero, as it was in the Oklo event. Solidification processes are needed. Relations with the states, etc. are touched upon

  18. Aircrew team management program

    Science.gov (United States)

    Margerison, Charles; Mccann, Dick; Davies, Rod

    1987-01-01

    The key features of the Aircrew Team Management Workshop which was designed for and in consultation with Trans Australia Airlines are outlined. Five major sections are presented dealing with: (1) A profile of the airline and the designers; (2) Aircrew consultation and involvement; (3) Educational design and development; (4) Implementation and instruction; and (5) Evaluation and assessment. These areas are detailed.

  19. Wind power generation, load management and dispatch

    International Nuclear Information System (INIS)

    Canazza, V.; Cirillo, M.

    2007-01-01

    The renewed commitment of the United States and European Union for the promotion of renewable energy sources makes some reflections on the appropriate management of dispatch priority of renewable energy in Italy [it

  20. Decree nr 2014-764 of the 3 July 2014 related to electricity load managements

    International Nuclear Information System (INIS)

    Valls, Manuel; Royal, Segolene; Montebourg, Arnaud

    2014-01-01

    This decree issued by the Ministry of ecology, sustainable development and energy aims at defining the methodology used to establish rules of valorisation of electricity load managements. It concerns energy suppliers and load management operators. A first chapter defines what electricity load management is and who a load management operator is. The next chapter addresses the methodology, the definition of the electricity load management volume, data used for the certification of load management volumes. The third chapter describes how to calculate the premium awarded to load management operators. The last chapters indicate how the ministries define the premium amount, and some aspects related to the communication of data to load management operators

  1. A Program Management Framework for Facilities Managers

    Science.gov (United States)

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  2. Establishments of scientific radiation protection management program

    International Nuclear Information System (INIS)

    Pan Ziqiang

    1988-01-01

    Some aspects for establishing the radiation protection management program have been discussed. Radiation protection management program includes: definite aims of management, complete data register, strict supervision system, and scientific management methodology

  3. Multidisciplinary pain management programs.

    OpenAIRE

    Kaiser, Ulrike; Arnold, Bernhard; Pfingsten, Michael; Nagel, Bernd; Lutz, Johannes; Sabatowski, Rainer

    2013-01-01

    Ulrike Kaiser,1 Bernhard Arnold,2 Michael Pfingsten,3 Bernd Nagel,4 Johannes Lutz,5 Rainer Sabatowski1,61Comprehensive Pain Center, University Hospital “Carl Gustav Carus”, Dresden, 2Department of Pain Management, Klinikum Dachau, Dachau, 3Pain Clinic, University Medicine, University of Göttingen, 4Day Care Unit, DRK Pain Center, Mainz, 5Interdisciplinary Pain Center, Zentralklinik Bad Berka, Bad Berka, 6Department of Anesthesiology and Intensive Care, University ...

  4. Commercial equipment loads: End-Use Load and Consumer Assessment Program (ELCAP)

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, R.G.; Williamson, M.A.; Richman, E.E.; Miller, N.E.

    1990-07-01

    The Office of Energy Resources of the Bonneville Power Administration is generally responsible for the agency's power and conservation resource planning. As associated responsibility which supports a variety of office functions is the analysis of historical trends in and determinants of energy consumption. The Office of Energy Resources' End-Use Research Section operates a comprehensive data collection program to provide pertinent information to support demand-side planning, load forecasting, and demand-side program development and delivery. Part of this on-going program is known as the End-Use Load and Consumer Assessment Program (ELCAP), an effort designed to collect electricity usage data through direct monitoring of end-use loads in buildings. This program is conducted for Bonneville by the Pacific Northwest Laboratory. This report provides detailed information on electricity consumption of miscellaneous equipment from the commercial portion of ELCAP. Miscellaneous equipment includes all commercial end-uses except heating, ventilating, air conditioning, and central lighting systems. Some examples of end-uses covered in this report are office equipment, computers, task lighting, refrigeration, and food preparation. Electricity consumption estimates, in kilowatt-hours per square food per year, are provided for each end-use by building type. The following types of buildings are covered: office, retail, restaurant, grocery, warehouse, school, university, and hotel/motel. 6 refs., 35 figs., 12 tabs.

  5. Multidisciplinary pain management programs

    Directory of Open Access Journals (Sweden)

    Kaiser U

    2013-05-01

    Full Text Available Ulrike Kaiser,1 Bernhard Arnold,2 Michael Pfingsten,3 Bernd Nagel,4 Johannes Lutz,5 Rainer Sabatowski1,61Comprehensive Pain Center, University Hospital “Carl Gustav Carus”, Dresden, 2Department of Pain Management, Klinikum Dachau, Dachau, 3Pain Clinic, University Medicine, University of Göttingen, 4Day Care Unit, DRK Pain Center, Mainz, 5Interdisciplinary Pain Center, Zentralklinik Bad Berka, Bad Berka, 6Department of Anesthesiology and Intensive Care, University Hospital “Carl Gustav Carus”, Dresden, Germany

  6. Waste Management Operations Program

    International Nuclear Information System (INIS)

    Sease, J.D.

    1983-01-01

    The major function of the Program is to operate the Laboratory's systems and facilities for collecting and disposing of radioactive gaseous, liquid, and solid wastes. This includes collection and shallow land burial of about 2000 m 3 of β-γ contaminated waste and retrievable storage of about 60 m 3 of transuranium contaminated waste annually; ion-exchange treatment and release to the environment of about 450 x 10 3 m 3 of slightly contaminated water; volume reduction by evaporation of about 5000 m 3 of intermediate-level liquid waste followed by hydrofracture injection of the concentrate; and scrubbing and/or filtration of the gases from radioactive operations prior to release to the atmosphere. In addition, this year disposal of about 350,000 gal of radioactive sludge from the old (no longer in service) gunite tanks began. Operations are in conformance with rules and regulations presently applicable to ORNL. This Program is responsible for planning and for development activities for upgrading the facilities, equipment, and procedures for waste disposal to ensure ORNL work incorporates the latest technology. Major (line-item) new facilities are provided as well as substantial (GPP) upgrading of old facilities. These activities as well as the technical and engineering support to handle them are discussed

  7. Load management for refrigeration systems: Potentials and barriers

    International Nuclear Information System (INIS)

    Grein, Arne; Pehnt, Martin

    2011-01-01

    As a strategy to deal with the increasing intermittent input of renewable energy sources in Germany, the adaptation of power consumption is complementary to power-plant regulation, grid expansion and physical energy storage. One demand sector that promises strong returns for load management efforts is cooling and refrigeration. In these processes, thermal inertia provides a temporal buffer for shifting and adjusting the power consumption of cooling systems. We have conducted an empirical investigation to obtain a detailed and time-resolved bottom-up analysis of load management for refrigeration systems in the city of Mannheim, Germany. We have extrapolated our results to general conditions in Germany. Several barriers inhibit the rapid adoption of load management strategies for cooling systems, including informational barriers, strict compliance with legal cooling requirements, liability issues, lack of technical experience, an inadequate rate of return and organizational barriers. Small commercial applications of refrigeration in the food-retailing and cold storage in hotels and restaurants are particularly promising starting points for intelligent load management. When our results are applied to Germany, suitable sectors for load management have theoretical and achievable potential values of 4.2 and 2.8 GW, respectively, amounting to about 4-6% of the maximum power demand in Germany. - Highlights: → Potential and barriers for implementation of load shifting for refrigeration. → Empirical investigation for time-resolved bottom-up analysis in Mannheim, Germany. → Suitable sectors and further recommendations for introducing load management.→ Extrapolation of results from local to national level.

  8. Comparison of Building Energy Modeling Programs: Building Loads

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Dandan [Tsinghua Univ., Beijing (China); Hong, Tianzhen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Yan, Da [Tsinghua Univ., Beijing (China); Wang, Chuang [Tsinghua Univ., Beijing (China)

    2012-06-01

    This technical report presented the methodologies, processes, and results of comparing three Building Energy Modeling Programs (BEMPs) for load calculations: EnergyPlus, DeST and DOE-2.1E. This joint effort, between Lawrence Berkeley National Laboratory, USA and Tsinghua University, China, was part of research projects under the US-China Clean Energy Research Center on Building Energy Efficiency (CERC-BEE). Energy Foundation, an industrial partner of CERC-BEE, was the co-sponsor of this study work. It is widely known that large discrepancies in simulation results can exist between different BEMPs. The result is a lack of confidence in building simulation amongst many users and stakeholders. In the fields of building energy code development and energy labeling programs where building simulation plays a key role, there are also confusing and misleading claims that some BEMPs are better than others. In order to address these problems, it is essential to identify and understand differences between widely-used BEMPs, and the impact of these differences on load simulation results, by detailed comparisons of these BEMPs from source code to results. The primary goal of this work was to research methods and processes that would allow a thorough scientific comparison of the BEMPs. The secondary goal was to provide a list of strengths and weaknesses for each BEMP, based on in-depth understandings of their modeling capabilities, mathematical algorithms, advantages and limitations. This is to guide the use of BEMPs in the design and retrofit of buildings, especially to support China’s building energy standard development and energy labeling program. The research findings could also serve as a good reference to improve the modeling capabilities and applications of the three BEMPs. The methodologies, processes, and analyses employed in the comparison work could also be used to compare other programs. The load calculation method of each program was analyzed and compared to

  9. Ageing Management Program Database

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Zabric, I.; Savli, S.

    2008-01-01

    The aspects of plant ageing management (AM) gained increasing attention over the last ten years. Numerous technical studies have been performed to study the impact of ageing mechanisms on the safe and reliable operation of nuclear power plants. National research activities have been initiated or are in progress to provide the technical basis for decision making processes. The long-term operation of nuclear power plants is influenced by economic considerations, the socio-economic environment including public acceptance, developments in research and the regulatory framework, the availability of technical infrastructure to maintain and service the systems, structures and components as well as qualified personnel. Besides national activities there are a number of international activities in particular under the umbrella of the IAEA, the OECD and the EU. The paper discusses the process, procedure and database developed for Slovenian Nuclear Safety Administration (SNSA) surveillance of ageing process of Nuclear power Plant Krsko.(author)

  10. Defense Contract Management Command Support to System Acquisition Program Managers

    National Research Council Canada - National Science Library

    1999-01-01

    .... This report discusses the planning of contract administration office support to system acquisition program managers through the program integration process and the customer support outreach program...

  11. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  12. Load Management of Data Centers as Regulation Capacity in Denmark

    DEFF Research Database (Denmark)

    Clausen, Anders; Ghatikar, Girish; Jørgensen, Bo Nørregaard

    2014-01-01

    are of special interest as they account for 500 GWh of consumption in Denmark or nearly 2% of the total electricity consumption. This paper performs an analysis on load management capabilities of data centers in Denmark based on the experiences in the U.S. We characterize the load management capabilities...... for transmission system operators and distribution system operators and balance errors in forecasts made by balance responsible parties. By enabling the demand-side to adapt consumption to match power generation, we can address this in a cost-effective and environmental sound way. In this context, data centers...... of the data centers based on their types, technology, and their application as grid management resources. Further, we identify demand-side entry barriers towards market participation. Our findings suggest that groups of data centers can offer dynamic load flexibility as virtual power plants, and thereby...

  13. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  14. The NASA risk management program

    International Nuclear Information System (INIS)

    Buchbinder, B.; Philipson, L.L.

    1989-01-01

    This paper reports that the NASA Risk Management Program has been established to ensure the appropriate application of risk-based procedures in support of the elimination, reduction, or acceptance of significant safety risks of concern in NASA. The term appropriate is emphasized, in that the particular procedures applied to each given risk are to reflect its character and prioritized importance, the technological and economic feasibility of its treatment. A number of key documents have been produced in support of this implementation. Databases, risk analysis tools, and risk communication procedures requisite to the execution of the risk management functions also are being developed or documented. Several risk management applications have been made and a comprehensive application to a major new NASA program is underway. This paper summarizes the development and current status of the NASA Risk Management Program. Some principal actions that have been carried out in NASA in consonance with the program are noted particularly, and views are presented on the program's likely future directions

  15. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  16. Space program management methods and tools

    CERN Document Server

    Spagnulo, Marcello; Balduccini, Mauro; Nasini, Federico

    2013-01-01

    Beginning with the basic elements that differentiate space programs from other management challenges, Space Program Management explains through theory and example of real programs from around the world, the philosophical and technical tools needed to successfully manage large, technically complex space programs both in the government and commercial environment. Chapters address both systems and configuration management, the management of risk, estimation, measurement and control of both funding and the program schedule, and the structure of the aerospace industry worldwide.

  17. Managing a mixed waste program

    International Nuclear Information System (INIS)

    Koch, J.D.

    1994-01-01

    IT Corporation operates an analytical laboratory in St. Louis capable of analyzing environmental samples that are contaminated with both chemical and radioactive materials. Wastes generated during these analyses are hazardous in nature; some are listed wastes others exhibit characteristic hazards. When the original samples contain significant quantities of radioactive material, the waste must be treated as a mixed waste. A plan was written to document the waste management program describing the management of hazardous, radioactive and mixed wastes. This presentation summarizes the methods employed by the St. Louis facility to reduce personnel exposures to the hazardous materials, minimize the volume of mixed waste and treat the materials prior to disposal. The procedures that are used and the effectiveness of each procedure will also be discussed. Some of the lessons that have been learned while dealing with mixed wastes will be presented as well as the solutions that were applied. This program has been effective in reducing the volume of mixed waste that is generated. The management program also serves as a method to manage the costs of the waste disposal program by effectively segregating the different wastes that are generated

  18. Indoor Air Quality Management Program.

    Science.gov (United States)

    Anne Arundel County Public Schools, Annapolis, MD.

    In an effort to provide Indoor Air Quality (IAQ) management guidance, Anne Arundel County Public Schools was selected by the Maryland State Department of Education to develop a program that could be used by other school systems. A major goal was to produce a handbook that was "user friendly." Hence, its contents are a mix of history,…

  19. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  20. Load and Flexibility Models for Distribution Grid Management

    DEFF Research Database (Denmark)

    Kouzelis, Konstantinos

    to advanced metering and control infrastructure investments. These investments will transform distribution networks into smarter" grids which will facilitate flexible load/generation control in return for financial and reliability benefits to electricity consumers. The theoretical idea of modernising the grid...... involve lack of generic load forecasts, need for flexible load/generation estimation techniques from smart meter measurements, deficiencies in online load distribution observability, and, finally, energy market compatible control algorithms which treat consumer flexibility in a fair manner. These modules...... congestions, is proposed. In the first step, a central controller manages flexibility proactively, whereas in the second step a decentralised control scheme deals with flexibility reactively. Both controllers are designed in such a way, that compatibility with contemporary markets is assured, while special...

  1. Power quality load management for large spacecraft electrical power systems

    Science.gov (United States)

    Lollar, Louis F.

    1988-01-01

    In December, 1986, a Center Director's Discretionary Fund (CDDF) proposal was granted to study power system control techniques in large space electrical power systems. Presented are the accomplishments in the area of power system control by power quality load management. In addition, information concerning the distortion problems in a 20 kHz ac power system is presented.

  2. A program for calculating load coefficient matrices utilizing the force summation method, L218 (LOADS). Volume 1: Engineering and usage

    Science.gov (United States)

    Miller, R. D.; Anderson, L. R.

    1979-01-01

    The LOADS program L218, a digital computer program that calculates dynamic load coefficient matrices utilizing the force summation method, is described. The load equations are derived for a flight vehicle in straight and level flight and excited by gusts and/or control motions. In addition, sensor equations are calculated for use with an active control system. The load coefficient matrices are calculated for the following types of loads: translational and rotational accelerations, velocities, and displacements; panel aerodynamic forces; net panel forces; shears and moments. Program usage and a brief description of the analysis used are presented. A description of the design and structure of the program to aid those who will maintain and/or modify the program in the future is included.

  3. Sport Management Graduate Programs: Characteristics of Effectiveness.

    Science.gov (United States)

    Li, Ming; And Others

    1994-01-01

    Reports a study that examined the characteristics that enable graduate sport management programs to achieve their objectives. Surveys of sport management educators found they agreed on 11 characteristics that indicated a sport management program's effectiveness. Respondents believed an effective program should produce sport managers, not…

  4. Basic analysis on the load management in consumer section

    Energy Technology Data Exchange (ETDEWEB)

    Tezuka, Tetsuo; Nishikawa, Eiichi

    1988-05-01

    The load management of the energy (electric power, gas and oil products) in consumer section means to move demand characteristics in desirable directions. The demand characteristics are represented by the energy consumption characteristics along time and their annual sum. The load management is analyzed here from a more practical point of view. As the total thermal demand has been fixed to some extent from the aspect of a total system, the trade-off occurs among objectives of industries. For the quantitative consistency, the model analysis is effective. Changes in the consumers' attitude have been observed as indicated by the cogeneration, heat storage technology and automatic energy management by consumers. Techniques for changing the demand characteristics include the charging system, financial aids for equipment installation, favorable provisions in taxation, law revision and marketing. Stable supply and improved consumption are the future tasks. (2 figs, 6 tabs, 28 refs)

  5. Optimisation models and solution methods for load management

    Energy Technology Data Exchange (ETDEWEB)

    Gustafsson, Stig-Inge [Linkoeping Univ. (Sweden). Div. of Wood Science and Technology; Roennqvist, Mikael; Claesson, Marcus [Linkoeping Univ. (Sweden). Div. of Optimisation

    2001-02-01

    The electricity market in Sweden has changed during recent years. Electricity for industrial use can nowadays be purchased from a number of competing electricity suppliers. Hence, the price for each kilowatt-hour is significantly lower than just two years ago and the interest for electricity conservation measures has declined. Part of the electricity tariff is, however, almost the same as before, i.e. the demand cost expressed in Swedish Kronor, SEK, for each kilowatt. This has put focus on load management measures in order to decrease this specific cost. Saving one kWh might lead to monetary savings between 0.22 to 914 SEK and this paper shows how to save only those kWh which really save money. A load management system has been installed in a small carpentry factory and the device can turn off equipment due to a certain priority and for a number of minutes each hour. The question is now, what level on the electricity load is optimal in a strict mathematical sense, i.e. how many kW should be set in the load management computer in order to get the best profitability? In this paper we develop a mathematical model which can be used both as a tool to find a best profitable subscription level and as a tool to control the turn of choices. Numerical results from a case study are presented.

  6. Calculation of projected waste loads for transuranic waste management alternatives

    International Nuclear Information System (INIS)

    Hong, K.; Kotek, T.; Koebnick, B.; Wang, Y.; Kaicher, C.

    1995-01-01

    The level of treatment and the treatment and interim storage site configurations (decentralized, regional, or centralized) impact transuranic (TRU) waste loads at and en route to sites in the US Department of Energy (DOE) complex. Other elements that impact waste loads are the volume and characteristics of the waste and the unit operation parameters of the technologies used to treat it. Projected annual complexwide TRU waste loads under various TRU waste management alternatives were calculated using the WASTEunderscoreMGMT computational model. WASTEunderscoreMGMT accepts as input three types of data: (1) the waste stream inventory volume, mass, and contaminant characteristics by generating site and waste stream category; (2) unit operation parameters of treatment technologies; and (3) waste management alternative definitions. Results indicate that the designed capacity of the Waste Isolation Pilot Plant, identified under all waste management alternatives as the permanent disposal facility for DOE-generated TRU waste, is sufficient for the projected complexwide TRU waste load under any of the alternatives

  7. Optimisation models and solution methods for load management

    International Nuclear Information System (INIS)

    Gustafsson, Stig-Inge; Roennqvist, Mikael; Claesson, Marcus

    2001-02-01

    The electricity market in Sweden has changed during recent years. Electricity for industrial use can nowadays be purchased from a number of competing electricity suppliers. Hence, the price for each kilowatt-hour is significantly lower than just two years ago and the interest for electricity conservation measures has declined. Part of the electricity tariff is, however, almost the same as before, i.e. the demand cost expressed in Swedish Kronor, SEK, for each kilowatt. This has put focus on load management measures in order to decrease this specific cost. Saving one kWh might lead to monetary savings between 0.22 to 914 SEK and this paper shows how to save only those kWh which really save money. A load management system has been installed in a small carpentry factory and the device can turn off equipment due to a certain priority and for a number of minutes each hour. The question is now, what level on the electricity load is optimal in a strict mathematical sense, i.e. how many kW should be set in the load management computer in order to get the best profitability? In this paper we develop a mathematical model which can be used both as a tool to find a best profitable subscription level and as a tool to control the turn of choices. Numerical results from a case study are presented

  8. Home audit program: management manual

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Many public power systems have initiated home energy audit programs in response to the requests of their consumers. The manual provides smaller public power systems with the information and specific skills needed to design and develop a program of residential energy audits. The program is based on the following precepts: locally owned public systems are the best, and in many cases the only agencies available to organize and coordinate energy conservation programs in many smaller communities; consumers' rights to energy conservation information and assistance should not hinge on the size of the utility that serves them; in the short run, public power systems of all sizes should offer residential energy conservation assistance to their consumers, because such assistance is desirable, necessary, and in the public interest; and in the long run, such programs will complement national energy goals and will produce economic benefits for both consumers and the public power system. A detailed description of home audit program planning, organization, and management are given. (MCW)

  9. 76 FR 39857 - Alaska Coastal Management Program Withdrawal From the National Coastal Management Program Under...

    Science.gov (United States)

    2011-07-07

    ... DEPARTMENT OF COMMERCE National Oceanic Atmospheric Administration Alaska Coastal Management Program Withdrawal From the National Coastal Management Program Under the Coastal Zone Management Act (CZMA) AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Ocean Service (NOS...

  10. 76 FR 74842 - RTCA Program Management Committee

    Science.gov (United States)

    2011-12-01

    ... Minimum Aviation System Performance Standards (MASPS) for Advanced VHF Digital Data Communications... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration RTCA Program Management Committee... RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public...

  11. Establishing a total information management program

    International Nuclear Information System (INIS)

    Hegstrom, K.L.; Fisher, J.

    1982-01-01

    A total information management program manages documents for easy access and identifies data elements commonly found in all documents. The program thus links disparate documents by identifying information they share in common

  12. Recent research in electric power pricing and load management

    International Nuclear Information System (INIS)

    Tabors, R.D.

    1990-01-01

    Reliable electricity is a necessity for industrial and economic development. In the developing nations, power systems are growing rapidly. Typically, demand for electricity grows faster than either total energy demand or gross domestic product. Load management systems and innovative tariff structures offer to utilities potentially significant operating and capital cost savings through increased efficiency. Benefits must be weighed against the costs of implementation, communication, control and monitoring. When comparing developed and developing country utilities one may conclude that the developing countries may have far more to gain from direct load management and innovative tariff systems. They may be able to introduce variable (cost dependent/time dependent) reliability as opposed to the constant reliability expected in the USA and Western Europe; and many utilities may be able to design more flexible (and less costly) utility systems around a combination of load management and pricing structures, that encourage a higher level of interaction between customer and utility than is the case in the more developed utilities. (author). 84 refs

  13. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  14. 10 CFR 800.002 - Program management.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE CONTRACTS AND ASSISTANCE General § 800.002 Program management. Program management responsibility for...

  15. 30 CFR 401.12 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal year's...

  16. 20 CFR 638.800 - Program management.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures sufficient...

  17. 30 CFR 402.13 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 402.13 Section 402.13... WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or...

  18. 14 CFR 1214.1706 - Program management.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Program management. 1214.1706 Section 1214... Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible for program management under the direction of the Committee chairperson. ...

  19. File Managing and Program Execution in Web Operating Systems

    OpenAIRE

    Bravetti, Mario

    2010-01-01

    Web Operating Systems can be seen as an extension of traditional Operating Systems where the addresses used to manage files and execute programs (via the basic load/execution mechanism) are extended from local filesystem path-names to URLs. A first consequence is that, similarly as in traditional web technologies, executing a program at a given URL, can be done in two modalities: either the execution is performed client-side at the invoking machine (and relative URL addressing in the executed...

  20. Ciclon: A neutronic fuel management program for PWR's consecutive cycles

    International Nuclear Information System (INIS)

    Aragones, J.M.

    1977-01-01

    The program description and user's manual of a new computer code is given. Ciclon performs the neutronic calculation of consecutive reload cycles for PWR's fuel management optimization. Fuel characteristics and burnup data, region or batch sizes, loading schemes and state of previously irradiated fuel are input to the code. Cycle lengths or feed enrichments and burnup sharing for each region or batch are calculate using different core neutronic models and printed or punched in standard fuel management format. (author) [es

  1. Potential transportation demand management programs and measures

    Energy Technology Data Exchange (ETDEWEB)

    Litman, T. [Victoria Transport Policy Institute, Victoria, BC (Canada)

    1997-02-07

    The advantages of transportation demand management (TDM) programs were discussed. TDM includes several policies, programs and measures designed to change travel patterns. TDM programs include commute trip reductions, pricing policies, land use management strategies, and programs to support alternative modes of transportation such as public transit, carpooling, bicycling, walking and telecommuting. TDM programs are designed to reduce traffic congestion and air pollution. Some other TDM programs and measures include: enabling programs, alternative mode encouragement, driving disincentives, parking programs, marginalizing user costs, reducing automobile ownership, and land use management.

  2. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  3. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  4. University Program Management Information System

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  5. University Program Management Information System

    Science.gov (United States)

    2001-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA' objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  6. 40 CFR 130.11 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Program management. 130.11 Section 130... PLANNING AND MANAGEMENT § 130.11 Program management. (a) State agencies may apply for grants under sections 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate...

  7. FFTF and Advanced Reactors Transition Program Resource Loaded Schedule

    Energy Technology Data Exchange (ETDEWEB)

    GANTT, D.A.

    2000-10-31

    This Resource Load Schedule (RLS) addresses two missions. The Advanced Reactors Transition (ART) mission, funded by DOE-EM, is to transition assigned, surplus facilities to a safe and compliant, low-cost, stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D&D. Facilities to be transitioned include the 309 Building Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy Legacy facilities. This mission is funded through the Environmental Management (EM) Project Baseline Summary (PBS) RL-TP11, ''Advanced Reactors Transition.'' The second mission, the Fast Flux Test Facility (FFTF) Project, is funded through budget requests submitted to the Office of Nuclear Energy, Science and Technology (DOE-NE). The FFTF Project mission is maintaining the FFTF, the Fuels and Materials Examination Facility (FMEF), and affiliated 400 Area buildings in a safe and compliant standby condition. This mission is to preserve the condition of the plant hardware, software, and personnel in a manner not to preclude a plant restart. This revision of the Resource Loaded Schedule (RLS) is based upon the technical scope in the latest revision of the following project and management plans: Fast Flux Test Facility Standby Plan (Reference 1); Hanford Site Sodium Management Plan (Reference 2); and 309 Building Transition Plan (Reference 4). The technical scope, cost, and schedule baseline is also in agreement with the concurrent revision to the ART Fiscal Year (FY) 2001 Multi-Year Work Plan (MYWP), which is available in an electronic version (only) on the Hanford Local Area Network, within the ''Hanford Data Integrator (HANDI)'' application.

  8. Puget Sound Area Electric Reliability Plan. Appendix D, Conservation, Load Management and Fuel Switching Analysis : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    Various conservation, load management, and fuel switching programs were considered as ways to reduce or shift system peak load. These programs operate at the end-use level, such as residential water heat. Figure D-1a shows what electricity consumption for water heat looks like on normal and extreme peak days. Load management programs, such as water heat control, are designed to reduce electricity consumption at the time of system peak. On the coldest day in average winter, system load peaks near 8:00 a.m. In a winter with extremely cold weather, electricity consumption increases fr all hours, and the system peak shifts to later in the morning. System load shapes in the Puget Sound area are shown in Figure D-1b for a normal winter peak day (February 2, 1988) and extreme peak day (February 3, 1989). Peak savings from any program are calculated to be the reduction in loads on the entire system at the hour of system peak. Peak savings for all programs are measured at 8:00 a.m. on a normal peak day and 9:00 a.m. on an extreme peak day. On extremely cold day, some water heat load shifts to much later in the morning, with less load available for shedding at the time of system peak. Models of hourly end-use consumption were constructed to simulate the impact of conservation, land management, and fuel switching programs on electricity consumption. Javelin, a time-series simulating package for personal computers, was chosen for the hourly analysis. Both a base case and a program case were simulated. 15 figs., 7 tabs.

  9. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  10. AECL's mixed waste management program

    International Nuclear Information System (INIS)

    Peori, R.; Hulley, V.

    2006-01-01

    Every nuclear facility has it, they wish that they didn't but they have generated and do possess m ixed waste , and until now there has been no permanent disposition option; it has been for the most been simply maintained in interim storage. The nuclear industry has been responsibly developing permanent solutions for solid radioactive waste for over fifty years and for non-radioactive, chemically hazardous waste, for the last twenty years. Mixed waste (radioactive and chemically hazardous waste) however, because of its special, duo-hazard nature, has been a continuing challenge. The Hazardous Waste and Segregation Program (HW and SP) at AECL's CRL has, over the past ten years, been developing solutions to deal with their own in-house mixed waste and, as a result, have developed solutions that they would like to share with other generators within the nuclear industry. The main aim of this paper is to document and describe the early development of the solutions for both aqueous and organic liquid wastes and to advertise to other generators of this waste type how these solutions can be implemented to solve their mixed waste problems. Atomic Energy of Canada Limited (AECL) and in particular, CRL has been satisfactorily disposing of mixed waste for the last seven years. CRL has developed a program that not only disposes of mixed waste, but offers a full service mixed waste management program to customers within Canada (that could eventually include U.S. sites as well) that has developed the experience and expertise to evaluate and optimize current practices, dispose of legacy inventories, and set up an efficient segregation system to reduce and effectively manage, both the volumes and expense of, the ongoing generation of mixed waste for all generators of mixed waste. (author)

  11. Interaction between daily load demand curve and management of hydro-thermal generation system

    International Nuclear Information System (INIS)

    Granelli, G.; Montagna, M.; Pasini, G.; Innorta, M.; Marannino, P.

    1993-01-01

    The influence that the behaviour of the daily load demand curve has on the management of a hydro-thermal generation system is considered. The aim of this paper is to show the improvements that can be achieved by suitable load management techniques capable of flattening the load demand curve. The analysis is carried out by using a hydro-thermal scheduling program and a thermal unit dynamic dispatch procedure. The possibility of properly re-committing the available thermal units is also taken into account. The economical and technical convenience of shutting down less economical thermal units operating near the lower generations limits is verified. Finally, some considerations are made about the possible use of the thermal generation incremental costs as a tool for planning the end users' kWh prices, even in the short term. The results refer to a system with characteristics similar to those of the Italian one. In determining the daily load demand curves, the characteristics of load demand in Italy as well as in other European countries are taken into account

  12. Deemed Savings Estimates for Legacy Air Conditioning and WaterHeating Direct Load Control Programs in PJM Region

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, Charles

    2007-03-01

    During 2005 and 2006, the PJM Interconnection (PJM) Load Analysis Subcommittee (LAS) examined ways to reduce the costs and improve the effectiveness of its existing measurement and verification (M&V) protocols for Direct Load Control (DLC) programs. The current M&V protocol requires that a PURPA-compliant Load Research study be conducted every five years for each Load-Serving Entity (LSE). The current M&V protocol is expensive to implement and administer particularly for mature load control programs, some of which are marginally cost-effective. There was growing evidence that some LSEs were mothballing or dropping their DLC programs in lieu of incurring the expense associated with the M&V. This project had several objectives: (1) examine the potential for developing deemed savings estimates acceptable to PJM for legacy air conditioning and water heating DLC programs, and (2) explore the development of a collaborative, regional, consensus-based approach for conducting monitoring and verification of load reductions for emerging load management technologies for customers that do not have interval metering capability.

  13. Repository-Based Software Engineering Program: Working Program Management Plan

    Science.gov (United States)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  14. Radioactive Waste Management Program Activities in Croatia

    International Nuclear Information System (INIS)

    Matanic, R.

    2000-01-01

    The concept of radioactive waste management in Croatia comprises three major areas: management of low and intermediate level radioactive waste (LILRW), spent fuel management and decommissioning. All the work regarding radioactive waste management program is coordinated by Hazardous Waste Management Agency (APO) and Croatian Power Utility (HEP) in cooperation with other relevant institutions. Since the majority of work has been done in developing low and intermediate level radioactive waste management program, the paper will focus on this part of radioactive waste management, mainly on issues of site selection and characterization, repository design, safety assessment and public acceptance. A short description of national radioactive waste management infrastructure will also be presented. (author)

  15. Disease management: findings from leading state programs.

    Science.gov (United States)

    Wheatley, Ben

    2002-12-01

    Disease management programs are designed to contain costs by improving health among the chronically ill. More than 20 states are now engaged in developing and implementing Medicaid disease management programs for their primary care case management and fee-for-service populations.

  16. Evaluating and Selecting Sport Management Undergraduate Programs.

    Science.gov (United States)

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1998-01-01

    States that the accelerated growth of sport management undergraduate programs that began in the 1980s has continued into the current decade. There are currently 180 sport management major programs in American colleges and universities. Describes the sports management approval process and suggests useful strategies to evaluate sport management…

  17. NASA and the Federal Management Intern Program.

    Science.gov (United States)

    Pound, Jack K.; Slack, Vivian M.

    A review of NASA Federal Management Intern (MI) programs indicates potential for identification, attraction, and early development of successful administrative management employees, but suggests that successful development of managers is a function of the long-term care with which an agency pursues MI programs. A recent study of separations in…

  18. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  19. Optimal Load Response to Time-of-Use Power Price for Demand Side Management in Denmark

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Bak-Jensen, Birgitte

    2010-01-01

    -of-use power price for demand side management in order to save the energy costs as much as possible. 3 typical different kinds of loads (industrial load, residential load and commercial load) in Denmark are chosen as study cases. The energy costs decrease up to 9.6% with optimal load response to time......-of-use power price for different loads. Simulation results show that the optimal load response to time-of-use power price for demand side management generates different load profiles and reduces the load peaks. This kind of load patterns may also have significant effects on the power system normal operation.......Since the hourly spot market price is available one day ahead in Denmark, the price could be transferred to the consumers and they may shift their loads from high price periods to the low price periods in order to save their energy costs. This paper presents a load optimization method to time...

  20. Study of load balancing technology for EAST data management

    Energy Technology Data Exchange (ETDEWEB)

    Li, Shi, E-mail: lishi@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Wang, Feng [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Xiao, Bingjia [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); School of Nuclear Science and Technology, University of Science and Technology of China, Hefei, Anhui (China); Yang, Fei [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Department of Computer Science, Anhui Medical University, Hefei, Anhui (China); Sun, Xiaoyang; Wang, Yong [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China)

    2014-05-15

    Highlights: • The load balancing concept is introduced into the MDSplus data service. • The new data service system based on the LVS framework and heartbeat technologies are described. • The scheduling algorithm “WLC” is used, and a software system is developed for optimizing the weight of node server. - Abstract: With the continuous renewal and increasing number of diagnostics, the EAST tokamak routinely generates ∼3 GB of raw data per pulse of the experiment, which is transferred to a centralized data management system. In order to strengthen international cooperation, all the acquired data has been converted and stored in the MDSplus servers. During the data system operation, there are some problems when a lot of client machines connect to a single MDSplus data server. Because the server process keeps the connection until the client closes its connection, a lot of server processes use a lot of network ports and consume a large amount of memory, so that the speed of access to data is very slow, but the CPU resource is not fully utilized. To improve data management system performance, many MDSplus servers will be installed on the blade server and form a server cluster to realize load balancing and high availability by using LVS and heartbeat technology. This paper will describe the details of the design and the test results.

  1. Load management: Model-based control of aggregate power for populations of thermostatically controlled loads

    International Nuclear Information System (INIS)

    Perfumo, Cristian; Kofman, Ernesto; Braslavsky, Julio H.; Ward, John K.

    2012-01-01

    Highlights: ► Characterisation of power response of a population of air conditioners. ► Implementation of demand side management on a group of air conditioners. ► Design of a controller for the power output of a group of air conditioners. ► Quantification of comfort impact of demand side management. - Abstract: Large groups of electrical loads can be controlled as a single entity to reduce their aggregate power demand in the electricity network. This approach, known as load management (LM) or demand response, offers an alternative to the traditional paradigm in the electricity market, where matching supply and demand is achieved solely by regulating how much generation is dispatched. Thermostatically controlled loads (TCLs), such as air conditioners (ACs) and fridges, are particularly suitable for LM, which can be implemented using feedback control techniques to regulate their aggregate power. To achieve high performance, such feedback control techniques require an accurate mathematical model of the TCL aggregate dynamics. Although such models have been developed, they appear too complex to be effectively used in control design. In this paper we develop a mathematical model aimed at the design of a model-based feedback control strategy. The proposed model analytically characterises the aggregate power response of a population of ACs to a simultaneous step change in temperature set points. Based on this model, we then derive, and completely parametrise in terms of the ACs ensemble properties, a reduced-order mathematical model to design an internal-model controller that regulates aggregate power by broadcasting temperature set-point offset changes. The proposed controller achieves high LM performance provided the ACs are equipped with high resolution thermostats. With coarser resolution thermostats, which are typical in present commercial and residential ACs, performance deteriorates significantly. This limitation is overcome by subdividing the population

  2. Intelligence Community Programs, Management, and Enduring Issues

    Science.gov (United States)

    2016-11-08

    books, journal papers, conference presentations, working papers, and other electronic and print publications. Intelligence Community Programs... Intelligence Community Programs, Management, and Enduring Issues Anne Daugherty Miles Analyst in Intelligence and National Security Policy...

  3. Development of a VVER-1000 core loading pattern optimization program based on perturbation theory

    International Nuclear Information System (INIS)

    Hosseini, Mohammad; Vosoughi, Naser

    2012-01-01

    Highlights: ► We use perturbation theory to find an optimum fuel loading pattern in a VVER-1000. ► We provide a software for in-core fuel management optimization. ► We consider two objectives for our method (perturbation theory). ► We show that perturbation theory method is very fast and accurate for optimization. - Abstract: In-core nuclear fuel management is one of the most important concerns in the design of nuclear reactors. Two main goals in core fuel loading pattern design optimization are maximizing the core effective multiplication factor in order to extract the maximum energy, and keeping the local power peaking factor lower than a predetermined value to maintain the fuel integrity. Because of the numerous possible patterns of fuel assemblies in the reactor core, finding the best configuration is so important and challenging. Different techniques for optimization of fuel loading pattern in the reactor core have been introduced by now. In this study, a software is programmed in C language to find an order of the fuel loading pattern of a VVER-1000 reactor core using the perturbation theory. Our optimization method is based on minimizing the radial power peaking factor. The optimization process launches by considering an initial loading pattern and the specifications of the fuel assemblies which are given as the input of the software. The results on a typical VVER-1000 reactor reveal that the method could reach to a pattern with an allowed radial power peaking factor and increases the cycle length 1.1 days, as well.

  4. Global pest management program wins international award

    OpenAIRE

    Rich, Miriam Sommers

    2009-01-01

    An agricultural research program managed at Virginia Tech has won an international award for its work with pest-management practices that show economic benefits with minimal impact on health and the environment.

  5. The Air Program Information Management System (APIMS)

    Science.gov (United States)

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  6. Tapping into the Forest Management Assistance Programs

    Science.gov (United States)

    John L. Greene; Terry K. Haines

    1998-01-01

    Use of federal and state forest management assistance programs can enable nonindustial private forest owners to reduce their management expenses and practice better stewardship. This paper summarizes six federal and twelve state assistance programs available to owners in the North Central states. It also describes how to calculate the amount of a government...

  7. Developing Program Management Leadership for Acquisition Reform

    Science.gov (United States)

    2011-04-30

    mêçÅÉÉÇáåÖë= çÑ=íÜÉ= bfdeqe=^kkr^i=^`nrfpfqflk== obpb^o`e=pvjmlpfrj== qeropa^v=pbppflkp== slirjb ff Developing Program Management Leadership for...4. TITLE AND SUBTITLE Developing Program Management Leadership for Acquisition Reform 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Developing Program  Management   Leadership   for Acquisition Reform    The 8th Annual Acquisition Research Symposium Panel #20: Investing in People

  8. Waste management in Canadian nuclear programs

    International Nuclear Information System (INIS)

    Dyne, P.J.

    1975-08-01

    The report describes the wide-ranging program of engineering developments and applications to provide the Canadian nuclear industry with the knowledge and expertise it needs to conduct its waste management program. The need for interim dry storage of spent fuel, and the storage and ultimate disposal of waste from fuel reprocessing are examined. The role of geologic storage in AECL's current waste management program is also considered. (R.A.)

  9. Benefits of a formal waste management program

    International Nuclear Information System (INIS)

    Wolfe, R.A.

    1974-01-01

    The proper management of waste is of vital importance in the conservation of our environment. Mound Laboratory, which is operated by Monsanto Research Corporation for the U. S. Atomic Energy Commission, has embarked upon a waste management program designed to assure that the generation, processing, storage, and disposal of waste is conducted in such a manner as to have a minimum impact on the environment. The organizational approach taken toward waste management is discussed and some of the benefits of the waste management program at Mound Laboratory are described. Ithas been shown that the utilization of proper waste management techniques can have economic, as well as environmental protection, benefits. (U.S.)

  10. Management strategies for surplus electricity loads using electrolytic hydrogen

    International Nuclear Information System (INIS)

    Gutierrez-Martin, F.; Garcia-De Maria, J.M.; Bairi, A.; Laraqi, N.

    2009-01-01

    Management of electricity-hydrogen binomials is greatly enhanced by the knowledge of power variations, together with an optimized performance of the electrolyzers. Strategies include the regulation of current densities to minimize hydrogen costs, which depend of the energy prices, the power of installations and utilization factors. The objective is to convert the energy in distinct periods of electricity demand, taking into account the size and efficiency of the equipments; this approach indicates the possibility to reduce costs below a reference price, either by using small facilities which consume high proportions of surplus energy or larger plants for shorter off-peak periods. Thus, we study the viability of large scale production of hydrogen via electrolysis, within the context of excess electricity loads in France (estimated at 22 TWh in 2007): that gives a daily hydrogen potential of 1314 ton, from a total installed power of 5800 MW and average utilization ratios of 42.8%; the production cost approaches 1$/kg H2 , and CO 2 reduction potential amounts 6720 kton/year (if all the produced hydrogen is used to feed 3 million of new fuel-cell vehicles). This analysis serves to demonstrate the great potentials for converting the surplus energy into hydrogen carriers and for managing the power subsystem in thoroughly electrified societies. (author)

  11. High-Uranium-Loaded U3O8-Al fuel element development program. Part 1

    International Nuclear Information System (INIS)

    Martin, M.M.

    1993-01-01

    The High-Uranium-Loaded U 3 O 8 -Al Fuel Element Development Program supports Argonne National Laboratory efforts to develop high-uranium-density research and test reactor fuel to accommodate use of low-uranium enrichment. The goal is to fuel most research and test reactors with uranium of less than 20% enrichment for the purpose of lowering the potential for diversion of highly-enriched material for nonpeaceful usages. The specific objective of the program is to develop the technological and engineering data base for U 3 O 8 -Al plate-type fuel elements of maximal uranium content to the point of vendor qualification for full scale fabrication on a production basis. A program and management plan that details the organization, supporting objectives, schedule, and budget is in place and preparation for fuel and irradiation studies is under way. The current programming envisions a program of about four years duration for an estimated cost of about two million dollars. During the decades of the fifties and sixties, developments at Oak Ridge National Laboratory led to the use of U 3 O 8 -Al plate-type fuel elements in the High Flux Isotope Reactor, Oak Ridge Research Reactor, Puerto Rico Nuclear Center Reactor, and the High Flux Beam Reactor. Most of the developmental information however applies only up to a uranium concentration of about 55 wt % (about 35 vol % U 3 O 8 ). The technical issues that must be addressed to further increase the uranium loading beyond 55 wt % U involve plate fabrication phenomena of voids and dogboning, fuel behavior under long irradiation, and potential for the thermite reaction between U 3 O 8 and aluminum

  12. Public policy analysis of energy efficiency and load management in changing electricity business

    Energy Technology Data Exchange (ETDEWEB)

    Vine, E. [Lawrence Berkeley National Laboratory, Berkeley, CA (United States). Energy Analysis Dept.; Hamrin, J. [Centre for Resource Solutions (United States); Eyre, N. [Energy Savings Trust (United Kingdom); Crossley, D.; Maloney, M.; Watt, G. [Energy Futures Australia Pty Ltd (Australia)

    2003-04-01

    The focus of this paper is (1) the potential effectiveness of the reform of the electricity industry on promoting energy efficiency and load management, and (2) the potential effectiveness of new mechanisms for promoting energy efficiency and load management. Many countries are initiating reforms of their power sectors to stimulate private investment, increase operation and management efficiencies, and lower the cost of power. These countries are unbundling vertically integrated utilities into distinct generation, transmission, distribution and retail supply companies; introducing commercial management principles to government-owned monopolies; and in many cases transferring operation or ownership to private companies. Electric industry restructuring may force regulators and policy makers to re-examine existing mechanisms for promoting load management and energy efficiency. In some cases, electric industry restructuring replaces the long-standing relationship between a single monopoly provider and protected customer franchise with a new set of relationships among retail electricity suppliers and customers who may now be free to choose suppliers. In these types of situations, markets, not government regulators and utility monopolies, are seen as determining future energy production and consumption decisions. However, it is uncertain whether this type of restructuring will overcome important market barriers to energy efficiency that limit markets for energy-efficient products and services from functioning effectively. As a result of these barriers, a large, untapped potential for cost-effective energy-efficiency investments exists. Supporters of public policies argue that energy-efficiency programs are an appropriate government strategy to capture economic efficiencies that the market cannot secure unassisted. (author)

  13. Public policy analysis of energy efficiency and load management in changing electricity businesses

    Energy Technology Data Exchange (ETDEWEB)

    Vine, Edward; Hamrin, Jan; Eyre, Nick; Crossley, David; Maloney, Michelle; Watt, Greg

    2003-04-01

    The focus of this paper is (1) the potential effectiveness of the reform of the electricity industry on promoting energy efficiency and load management, and (2) the potential effectiveness of new mechanisms for promoting energy efficiency and load management. Many countries are initiating reforms of their power sectors to stimulate private investment, increase operation and management efficiencies, and lower the cost of power. These countries are unbundling vertically integrated utilities into distinct generation, transmission, distribution and retail supply companies; introducing commercial management principles to government-owned monopolies; and in many cases transferring operation or ownership to private companies. Electric industry restructuring may force regulators and policy makers to re-examine existing mechanisms for promoting load management and energy efficiency. In some cases, electric industry restructuring replaces the long-standing relationship between a single monopoly provider and protected customer franchise with a new set of relationships among retail electricity suppliers and customers who may now be free to choose suppliers. In these types of situations, markets, not government regulators and utility monopolies, are seen as determining future energy production and consumption decisions. However, it is uncertain whether this type of restructuring will overcome important market barriers to energy efficiency that limit markets for energy-efficient products and services from functioning effectively. As a result of these barriers, a large, untapped potential for cost-effective energy-efficiency investments exists. Supporters of public policies argue that energy-efficiency programs are an appropriate government strategy to capture economic efficiencies that the market cannot secure unassisted.

  14. Public policy analysis of energy efficiency and load management in changing electricity businesses

    International Nuclear Information System (INIS)

    Vine, Edward; Hamrin, Jan; Eyre, Nick; Crossley, David; Maloney, Michelle; Watt, Greg

    2003-01-01

    The focus of this paper is (1) the potential effectiveness of the reform of the electricity industry on promoting energy efficiency and load management, and (2) the potential effectiveness of new mechanisms for promoting energy efficiency and load management. Many countries are initiating reforms of their power sectors to stimulate private investment, increase operation and management efficiencies, and lower the cost of power. These countries are unbundling vertically integrated utilities into distinct generation, transmission, distribution and retail supply companies; introducing commercial management principles to government-owned monopolies; and in many cases transferring operation or ownership to private companies. Electric industry restructuring may force regulators and policy makers to re-examine existing mechanisms for promoting load management and energy efficiency. In some cases, electric industry restructuring replaces the long-standing relationship between a single monopoly provider and protected customer franchise with a new set of relationships among retail electricity suppliers and customers who may now be free to choose suppliers. In these types of situations, markets, not government regulators and utility monopolies, are seen as determining future energy production and consumption decisions. However, it is uncertain whether this type of restructuring will overcome important market barriers to energy efficiency that limit markets for energy-efficient products and services from functioning effectively. As a result of these barriers, a large, untapped potential for cost-effective energy-efficiency investments exists. Supporters of public policies argue that energy-efficiency programs are an appropriate government strategy to capture economic efficiencies that the market cannot secure unassisted

  15. Managing peak loads in energy grids: Comparative economic analysis

    International Nuclear Information System (INIS)

    Zhuk, A.; Zeigarnik, Yu.; Buzoverov, E.; Sheindlin, A.

    2016-01-01

    One of the key issues in modern energy technology is managing the imbalance between the generated power and the load, particularly during times of peak demand. The increasing use of renewable energy sources makes this problem even more acute. Various existing technologies, including stationary battery energy storage systems (BESS), can be employed to provide additional power during peak demand times. In the future, integration of on-board batteries of the growing fleet of electric vehicles (EV) and plug-in hybrid electric vehicles (PHEV) into the grid can provide power during peak demand hours (vehicle-to-grid, or V2G technology). This work provides cost estimates of managing peak energy demands using traditional technologies, such as maneuverable power plants, conventional hydroelectric, pumped storage plants and peaker generators, as well as BESS and V2G technologies. The derived estimates provide both per kWh and kW year of energy supplied to the grid. The analysis demonstrates that the use of battery storage is economically justified for short peak demand periods of <1 h. For longer durations, the most suitable technology remains the use of maneuverable steam gas power plants, gas turbine,reciprocating gas engine peaker generators, conventional hydroelectric, pumped storage plants. - Highlights: • Cost of managing peak energy demand employing different technologies are estimated. • Traditional technologies, stationary battery storage and V2G are compared. • Battery storage is economically justified for peak demand periods of <1 h. • V2G appears to have better efficiency than stationary battery storage in low voltage power grids.

  16. Comprehensive quality management program for radiation oncology

    International Nuclear Information System (INIS)

    Dawson, J.; Roy, T.; Abrath, F.; Wu, T.; Gu, J.; McDonald, R.; Kim, H.; Haenchen, M.

    1994-01-01

    A quality management program for both external beam irradiation (electron and photon modes) and brachytherapy (high dose rate (HDR) and low dose rate (LDR) has been developed. The program follows current USA federal regulations for therapeutic administration of by-product materials. After implementation of the program, 54 HDR patients, 36 LDR brachytherapy patients and 311 external beam patients (including 30 stereotactic radiosurgery cases) were treated. The results of this program are presented

  17. Energy efficiency - The struggle for load management is raging. The French Riviera redoubles savings

    International Nuclear Information System (INIS)

    Moragues, Manuel; Barla, Jean-Christophe

    2014-01-01

    A first article discusses the debate initiated by a decree on load management associated with the French Brottes law on energy. Load management is the possibility for consumers to reduce their consumption at peak hours. Electricity producers and suppliers are of course against, whereas new actors (load managers or aggregators) are for. The issue is then to determine who will pay this managed (and not consumed) energy. The article also evokes a controversy about the Brottes law which creates a bonus to subsidy load management, and comments the development of this load management market and its legal framework. A second article describes actions undertaken by industries of the French Riviera to manage their energy consumption

  18. Compromise Programming in forest management

    Science.gov (United States)

    Boris A. Poff; Aregai Tecle; Daniel G. Neary; Brian Geils

    2010-01-01

    Multi-objective decision-making (MODM) is an appropriate approach for evaluating a forest management scenario involving multiple interests. Today's land managers must accommodate commercial as well as non-commercial objectives that may be expressed quantitatively and/or qualitatively, and respond to social, political, economic and cultural changes. The spatial and...

  19. Program Manager’s Handbook

    Science.gov (United States)

    1989-03-01

    risk as early as cess control and process management are prin- possible and before Milestone II. Risk management ciples of the Deming philosophy for...operational concept dXcumcr t and software technical art form. The software development pro- development specifications. 4.16a Figure 1. LIFE CICLE

  20. Managing the supply chain with standard mixed loads

    NARCIS (Netherlands)

    Teulings, M.F.; Vlist, van der P.

    2001-01-01

    Describes the complementary standard mixed loads concept (the standard mix concept in short), which allows for assembling mixed loads at an upstream echelon. These standard mixed loads are assigned to customer orders at an echelon downstream of the chain. Describes two applications of the use of the

  1. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  2. Management practices in substance abuse treatment programs.

    Science.gov (United States)

    McConnell, K John; Hoffman, Kim A; Quanbeck, Andrew; McCarty, Dennis

    2009-07-01

    Efforts to understand how to improve the delivery of substance abuse treatment have led to a recent call for studies on the "business of addiction treatment." This study adapts an innovative survey tool to collect baseline management practice data from 147 addiction treatment programs enrolled in the Network for the Improvement of Addiction Treatment 200 project. Measures of "good" management practice were strongly associated with days to treatment admission. Management practice scores were weakly associated with revenues per employee but were not correlated with operating margins. Better management practices were more prevalent among programs with a higher number of competitors in their catchment area.

  3. Croatian radioactive waste management program: Current status

    International Nuclear Information System (INIS)

    Matanic, R.; Lebegner, J.

    2001-01-01

    Croatia has a responsibility to develop a radioactive waste management program partly due to co-ownership of Krsko nuclear power plant (Slovenia) and partly because of its own medical and industrial radioactive waste. The total amount of generated radioactive waste in Croatia is stored in temporary storages located at two national research institutes, while radioactive waste from Krsko remains in temporary storage on site. National power utility Hrvatska Elektroprivreda (HEP) and Hazardous Waste Management Agency (APO) coordinate the work regarding decommissioning, spent fuel management and low and intermediate level radioactive waste (LILRW) management in Croatia. Since the majority of work has been done in developing the LILRW management program, the paper focuses on this part of radioactive waste management. Issues of site selection, repository design, safety assessment and public acceptance are being discussed. A short description of the national radioactive waste management infrastructure has also been presented. (author)

  4. Program summary. Nuclear waste management and fuel cycle programs

    International Nuclear Information System (INIS)

    1982-07-01

    This Program Summary Document describes the US Department of Energy (DOE) Nuclear Waste Management and Fuel Cycle Programs. Particular emphasis is given to near-term, specifically Fiscal Year (FY) 1982, activities. The overall objective of these programs will be achieved by the demonstration of: (1) safe radioactive waste management practices for storage and disposal of high-level waste and (2) advanced technologies necessary to close the nuclear fuel cycle on a schedule which would assure a healthy future for the development of nuclear power in this country

  5. Low-level waste management program: technical program overview

    International Nuclear Information System (INIS)

    Lowrie, R.S.

    1981-01-01

    The mission of the technical program is to develop the technology component of the Department of Energy's Low-Level Waste Management Program and to manage research and development, demonstration, and documentation of the technical aspects of the program. Some of the major technology objectives are: develop and demonstrate techniques for waste generation reduction; develop and demonstrate waste treatment, handling and packaging techniques; develop and demonstrate the technology for greater confinement; and develop the technology for remedial action at existing sites. In addition there is the technology transfer objective which is to compile and issue a handbook documenting the technology for each of the above technology objectives

  6. Metra operations management development program : 2010 - 2015.

    Science.gov (United States)

    2016-11-04

    On behalf of the Urban Transportation Center, the University of Illinois (UIC) Great Cities Institute (GCI) provided curriculum development and training services to Metra for a workforce education program targeted to new and experienced managers. Met...

  7. Data warehousing in disease management programs.

    Science.gov (United States)

    Ramick, D C

    2001-01-01

    Disease management programs offer the benefits of lower disease occurrence, improved patient care, and lower healthcare costs. In such programs, the key mechanism used to identify individuals at risk for targeted diseases is the data warehouse. This article surveys recent warehousing techniques from HMOs to map out critical issues relating to the preparation, design, and implementation of a successful data warehouse. Discussions of scope, data cleansing, and storage management are included in depicting warehouse preparation and design; data implementation options are contrasted. Examples are provided of data warehouse execution in disease management programs that identify members with preexisting illnesses, as well as those exhibiting high-risk conditions. The proper deployment of successful data warehouses in disease management programs benefits both the organization and the member. Organizations benefit from decreased medical costs; members benefit through an improved quality of life through disease-specific care.

  8. Maintenance engineering of lifetime management programs

    International Nuclear Information System (INIS)

    Hervia Ruperez, F.

    1997-01-01

    The complexity of nuclear power plants obliges to stablish the adecuated management of its lifetime. This article describes the methodologies and the improvement the evaluation of lifetime programs and specially in Garona and Vandellos II Nuclear Power Plants. (Author)

  9. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  10. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  11. Economic value evaluation in disease management programs.

    Science.gov (United States)

    Magnezi, Racheli; Reicher, Sima; Shani, Mordechai

    2008-05-01

    Chronic disease management has been a rapidly growing entity in the 21st century as a strategy for managing chronic illnesses in large populations. However, experience has shown that disease management programs have not been able to demonstrate their financial value. The objectives of disease management programs are to create quality benchmarks, such as principles and guidelines, and to establish a uniform set of metrics and a standardized methodology for evaluating them. In order to illuminate the essence of disease management and its components, as well as the complexity and the problematic nature of performing economic calculations of their profitability and value, we collected data from several reports that dealt with the economic intervention of disease management programs. The disease management economic evaluation is composed of a series of steps, including the following major categories: data/information technology, information generation, assessment/recommendations, actionable customer plans, and program assessment/reassessment. We demonstrate the elements necessary for economic analysis. Disease management is one of the most innovative tools in the managed care environment and is still in the process of being defined. Therefore, objectives should include the creation of quality measures, such as principles and guidelines, and the establishment of a uniform set of metrics and a standardized methodology for evaluating them.

  12. Skidder load capacity and fuel consumption HP-41C program

    Science.gov (United States)

    Ross A. Phillips

    1983-01-01

    This program gives the log weight that the skidder can move and gives fuel consumption either in liters or gallons per turn. Slope of the skid trail, skidder weight, and skid distance must be entered into the program.

  13. One System for Blood Program Information Management

    Science.gov (United States)

    Gero, Michael G.; Klickstein, Judith S.; Hurst, Timm M.

    1980-01-01

    A system which integrates the diverse functions of a Blood Program within one structure is being assembled at the American National Red Cross Blood Services, Northeast Region. When finished, it will provide technical support for collection scheduling, donor recruitment, recordkeeping, laboratory processing, inventory management, HLA typing and matching, distribution, and administration within the Program. By linking these applications, a reporting structure useful to top management will be provided.

  14. Environmental Management Science Program Workshop. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  15. Load management potentials for the railway power system; Potenziale fuer das Lastmanagement im Bahnenergiesystem

    Energy Technology Data Exchange (ETDEWEB)

    Bosch, Julius; Aniceto, Josep M. [SBB AG Infrastruktur Energie, Zollikofen (Switzerland)

    2013-02-15

    The railway power supply system of the Schweizerische Bundesbahnen (SBB) is characterised by major load fluctuations that are expected to increase in the future. The available power that is generated must be kept at absolute load peak level which causes high costs. Simulations show that a load management is a practicable way of noticeably reducing load peaks in the SBB railway power supply system without having an adverse effect on railway operations or the energy demand.

  16. Computer-Aided Corrosion Program Management

    Science.gov (United States)

    MacDowell, Louis

    2010-01-01

    This viewgraph presentation reviews Computer-Aided Corrosion Program Management at John F. Kennedy Space Center. The contents include: 1) Corrosion at the Kennedy Space Center (KSC); 2) Requirements and Objectives; 3) Program Description, Background and History; 4) Approach and Implementation; 5) Challenges; 6) Lessons Learned; 7) Successes and Benefits; and 8) Summary and Conclusions.

  17. Knowledge-Based System to Support Plug Load Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Electrical plug loads comprise an increasingly larger share of building energy consumption as improvements have been made to Heating, Ventilation, and Air...

  18. Benchmarking Outdoor Expeditionary Program Risk Management Strategies

    Science.gov (United States)

    Meerts-Brandsma, Lisa; Furman, Nate; Sibthorp, Jim

    2017-01-01

    In 2003, the University of Utah and the National Outdoor Leadership School (NOLS) completed a study that developed a risk management taxonomy in the outdoor adventure industry and assessed how different outdoor expeditionary programs (OEPs) managed risk (Szolosi, Sibthorp, Paisley, & Gookin, 2003). By unifying the language around risk, the…

  19. Cryogenic fluid management program flight concept definition

    Science.gov (United States)

    Kroeger, Erich

    1987-01-01

    The Lewis Research Center's cryogenic fluid management program flight concept definition is presented in viewgraph form. Diagrams are given of the cryogenic fluid management subpallet and its configuration with the Delta launch vehicle. Information is given in outline form on feasibility studies, requirements definition, and flight experiments design.

  20. UNBC: Outdoor Recreation and Tourism Management Program

    Science.gov (United States)

    Maher, Pat

    2007-01-01

    This article describes the University of Northern British Columbia's (UNBC's) Outdoor Recreation and Tourism Management (ORTM) Program, which focuses squarely on the management of outdoor recreation as it relates to conservation (i.e., in and around parks and protected areas), tourism that is both based in and concerned with the natural/cultural…

  1. The Columbia University Management Program.

    Science.gov (United States)

    Yavarkovsky, Jerome; Haas, Warren J.

    In 1971, a management consulting firm undertook a case study of the Columbia University libraries to improve library performance by reviewing and strengthening the organization and recasting staff composition and deployment patterns. To implement the study's recommendations, an administrative structure was proposed which would emphasize functional…

  2. Marketing the Masters of Executive Management program

    OpenAIRE

    Barrera, Mark A.; Karriker, Timothy W.

    2007-01-01

    MBA Professional Report The purpose of this MBA project was to review the current Masters of Executive Management education curriculum at NPS. An internal analysis of the current program was conducted to fully understand the strategic goals of the program and the existing curriculum. An environmental scan of current and potential military customers was conducted to assess requirements for junior executive education and determine whether the MEM program corresponds with these requiremen...

  3. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  4. Environmental Restoration Program Control Management System

    International Nuclear Information System (INIS)

    Duke, R.T.

    1992-01-01

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system

  5. Demand response modeling considering Interruptible/Curtailable loads and capacity market programs

    International Nuclear Information System (INIS)

    Aalami, H.A.; Moghaddam, M. Parsa; Yousefi, G.R.

    2010-01-01

    Recently, a massive focus has been made on demand response (DR) programs, aimed to electricity price reduction, transmission lines congestion resolving, security enhancement and improvement of market liquidity. Basically, demand response programs are divided into two main categories namely, incentive-based programs and time-based programs. The focus of this paper is on Interruptible/Curtailable service (I/C) and capacity market programs (CAP), which are incentive-based demand response programs including penalties for customers in case of no responding to load reduction. First, by using the concept of price elasticity of demand and customer benefit function, economic model of above mentioned programs is developed. The proposed model helps the independent system operator (ISO) to identify and employ relevant DR program which both improves the characteristics of the load curve and also be welcome by customers. To evaluate the performance of the model, simulation study has been conducted using the load curve of the peak day of the Iranian power system grid in 2007. In the numerical study section, the impact of these programs on load shape and load level, and benefit of customers as well as reduction of energy consumption are shown. In addition, by using strategy success indices the results of simulation studies for different scenarios are analyzed and investigated for determination of the scenarios priority. (author)

  6. A pollutant load hierarchical allocation method integrated in an environmental capacity management system for Zhushan Bay, Taihu Lake.

    Science.gov (United States)

    Liang, Shidong; Jia, Haifeng; Yang, Cong; Melching, Charles; Yuan, Yongping

    2015-11-15

    An environmental capacity management (ECM) system was developed to help practically implement a Total Maximum Daily Load (TMDL) for a key bay in a highly eutrophic lake in China. The ECM system consists of a simulation platform for pollutant load calculation and a pollutant load hierarchical allocation (PLHA) system. The simulation platform was developed by linking the Environmental Fluid Dynamics Code (EFDC) and Water Quality Analysis Simulation Program (WASP). In the PLHA, pollutant loads were allocated top-down in several levels based on characteristics of the pollutant sources. Different allocation methods could be used for the different levels with the advantages of each method combined over the entire allocation. Zhushan Bay of Taihu Lake, one of the most eutrophic lakes in China, was selected as a case study. The allowable loads of total nitrogen, total phosphorus, ammonia, and chemical oxygen demand were found to be 2122.2, 94.9, 1230.4, and 5260.0 t·yr(-1), respectively. The PLHA for the case study consists of 5 levels. At level 0, loads are allocated to those from the lakeshore direct drainage, atmospheric deposition, internal release, and tributary inflows. At level 1 the loads allocated to tributary inflows are allocated to the 3 tributaries. At level 2, the loads allocated to one inflow tributary are allocated to upstream areas and local sources along the tributary. At level 3, the loads allocated to local sources are allocated to the point and non-point sources from different towns. At level 4, the loads allocated to non-point sources in each town are allocated to different villages. Compared with traditional forms of pollutant load allocation methods, PLHA can combine the advantages of different methods which put different priority weights on equity and efficiency, and the PLHA is easy to understand for stakeholders and more flexible to adjust when applied in practical cases. Copyright © 2015 Elsevier B.V. All rights reserved.

  7. Software defined networks reactive flow programming and load balance switching

    OpenAIRE

    Καλλιανιώτης, Νικόλαος; Kallianiotis, Nikolaos

    2017-01-01

    This project serves as a Master Thesis as the requirements of the master’s programme Master of Digital Communications and Networks. It proposes load balancing algorithms applied to Software-Defined Networks to achieve the best possible resource utilisation of each of the links present in a network. The open-sources Opendaylight project and Floodlight project are used as SDN controllers, and the network is emulated using Mininet software

  8. Anterior cruciate ligament injuries in soccer: Loading mechanisms, risk factors, and prevention programs

    Directory of Open Access Journals (Sweden)

    Boyi Dai

    2014-12-01

    Full Text Available Anterior cruciate ligament (ACL injuries are common in soccer. Understanding ACL loading mechanisms and risk factors for ACL injury is critical for designing effective prevention programs. The purpose of this review is to summarize the relevant literature on ACL loading mechanisms, ACL injury risk factors, and current ACL injury prevention programs for soccer players. Literature has shown that tibial anterior translation due to shear force at the proximal end of tibia is the primary ACL loading mechanism. No evidence has been found showing that knee valgus moment is the primary ACL loading mechanism. ACL loading mechanisms are largely ignored in previous studies on risk factors for ACL injury. Identified risk factors have little connections to ACL loading mechanisms. The results of studies on ACL injury prevention programs for soccer players are inconsistent. Current ACL injury prevention programs for soccer players are clinically ineffective due to low compliance. Future studies are urgently needed to identify risk factors for ACL injury in soccer that are connected to ACL loading mechanisms and have cause-and-effect relationships with injury rate, and to develop new prevention programs to improve compliance.

  9. A System Architecture for Autonomous Demand Side Load Management in Smart Buildings

    DEFF Research Database (Denmark)

    Costanzo, Giuseppe Tommaso; Zhu, Guchuan; Anjos, Miguel F.

    2012-01-01

    This paper presents a system architecture for load management in smart buildings which enables autonomous demand side load management in the smart grid. Being of a layered structure composed of three main modules for admission control, load balancing, and demand response management...... in multiple time-scales and allows seamless integration of diverse techniques for online operation control, optimal scheduling, and dynamic pricing. The design of a home energy manager based on this architecture is illustrated and the simulation results with Matlab/Simulink confirm the viability...

  10. DOE Low-Level Waste Management Program

    International Nuclear Information System (INIS)

    Mezga, L.J.

    1983-01-01

    The Oak Ridge National Laboratory (ORNL) in its role as associate lead contractor of the DOE LLWMP has responsibility for the management of program-funded technology development activities. In this role with general guidance provided by DOE and the lead contractor (EG and G Idaho), the ORNL program office is charged with the responsibility to (1) develop program plans for the major technology areas, (2) recommend allocations for the program resources, (3) review the technology development tasks to ensure that program objectives are being met, and (4) to assist the lead contractor in coordinating the DOE LLWMP with other on-going US and foreign waste technology programs. Although the ORNL office generally assists the lead laboratory in management of the total program, our emphasis is on management of R and D for development of basic technology and to assess concepts for alternative systems of processing and disposal of LLW. Technical progress for each of the tasks of this program for FY 1982 is summarized

  11. Continuous Risk Management: A NASA Program Initiative

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  12. Modeling for the management of peak loads on a radiology image management network

    International Nuclear Information System (INIS)

    Dwyer, S.J.; Cox, G.G.; Templeton, A.W.; Cook, L.T.; Anderson, W.H.; Hensley, K.S.

    1987-01-01

    The design of a radiology image management network for a radiology department can now be assisted by a queueing model. The queueing model requires that the designers specify the following parameters: the number of tasks to be accomplished (acquisition of image data, transmission of data, archiving of data, displaying and manipulation of data, and generation of hard copies); the average times to complete each task; the patient scheduled arrival times; and the number/type of computer nodes interfaced to the network (acquisition nodes, interactive diagnostic display stations, archiving nodes, hard copy nodes, and gateways to hospital systems). The outcomes from the queuering model include mean throughput data rates and identified bottlenecks, and peak throughput data rates and identified bottlenecks. This exhibit presents the queueing model and illustrates its use in managing peak loads on an image management network

  13. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Rummery, T.E.; Rosinger, E.L.J.

    1983-05-01

    The Canadian Nuclear Fuel Waste Management Program is now well established. This report outlines the generic research and technological development underway in this program to assess the concept of immobilization and subsequent disposal of nuclear fuel waste deep in a stable plutonic rock in the Canadian Shield. The program participants, funding, schedule and associated external review processes are briefly outlined. The major scientific and engineering components of the program, namely, immobilization studies, geoscience research and environmental and safety assessment, are described in more detail

  14. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Rummery, T.E.; Rosinger, E.L.J.

    1984-12-01

    The Canadian Nuclear Fuel Waste Management Program is in the fourth year of a ten-year generic research and development phase. The objective of this phase of the program is to assess the basic safety and environmental aspects of the concept of isolating immobilized fuel waste by deep underground disposal in plutonic rock. The major scientific and engineering components of the program, namely immobilization studies, geoscience research, and environmental and safety assessment, are described. Program funding, scheduling and associated external review processes are briefly outlined

  15. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Dixon, R.S.

    1984-12-01

    The Canadian Nuclear Fuel Waste Management Program involves research into the storage and transportation of used nuclear fuel, immobilization of fuel waste, and deep geological disposal of the immobilized waste. The program is now in the fourth year of a ten-year generic research and development phase. The objective of this phase of the program is to assess the safety and environmental aspects of the deep underground disposal of immobilized fuel waste in plutonic rock. The objectives of the research for each component of the program and the progress made to the end of 1983 are described in this report

  16. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  17. Distributed Smart Device for Monitoring, Control and Management of Electric Loads in Domotic Environments

    Directory of Open Access Journals (Sweden)

    Carlos Perez-Vidal

    2012-04-01

    Full Text Available This paper presents a microdevice for monitoring, control and management of electric loads at home. The key idea is to compact the electronic design as much as possible in order to install it inside a Schuko socket. Moreover, the electronic Schuko socket (electronic microdevice + Schuko socket has the feature of communicating with a central unit and with other microdevices over the existing powerlines. Using the existing power lines, the proposed device can be installed in new buildings or in old ones. The main use of this device is to monitor, control and manage electric loads to save energy and prevent accidents produced by different kind of devices (e.g., iron used in domestic tasks. The developed smart device is based on a single phase multifunction energy meter manufactured by Analog Devices (ADE7753 to measure the consumption of electrical energy and thento transmit it using a serial interface. To provide current measurement information to the ADE7753, an ultra flat SMD open loop integrated circuit current transducer based on the Hall effect principle manufactured by Lem (FHS-40P/SP600 has been used. Moreover, each smart device has a PL-3120 smart transceiver manufactured by LonWorks to execute the user’s program, to communicate with the ADE7753 via serial interface and to transmit information to the central unit via powerline communication. Experimental results show the exactitude of the measurements made using the developed smart device.

  18. Distributed smart device for monitoring, control and management of electric loads in domotic environments.

    Science.gov (United States)

    Morales, Ricardo; Badesa, Francisco J; García-Aracil, Nicolas; Perez-Vidal, Carlos; Sabater, Jose María

    2012-01-01

    This paper presents a microdevice for monitoring, control and management of electric loads at home. The key idea is to compact the electronic design as much as possible in order to install it inside a Schuko socket. Moreover, the electronic Schuko socket (electronic microdevice + Schuko socket) has the feature of communicating with a central unit and with other microdevices over the existing powerlines. Using the existing power lines, the proposed device can be installed in new buildings or in old ones. The main use of this device is to monitor, control and manage electric loads to save energy and prevent accidents produced by different kind of devices (e.g., iron) used in domestic tasks. The developed smart device is based on a single phase multifunction energy meter manufactured by Analog Devices (ADE7753) to measure the consumption of electrical energy and then to transmit it using a serial interface. To provide current measurement information to the ADE7753, an ultra flat SMD open loop integrated circuit current transducer based on the Hall effect principle manufactured by Lem (FHS-40P/SP600) has been used. Moreover, each smart device has a PL-3120 smart transceiver manufactured by LonWorks to execute the user's program, to communicate with the ADE7753 via serial interface and to transmit information to the central unit via powerline communication. Experimental results show the exactitude of the measurements made using the developed smart device.

  19. Load shifting with the use of home energy management system implemented in FPGA

    Science.gov (United States)

    Bazydło, Grzegorz; Wermiński, Szymon

    2017-08-01

    The increases for power demand in the Electrical Power System (EPS) causes a significant increase of power in daily load curve and transmission line overload. The large variability in energy consumption in EPS combined with unpredictable weather events can lead to a situation in which to save the stability of the EPS, the power limits must be introduced or even industrial customers in a given area have to be disconnected, which causes financial losses. Nowadays, a Transmission System Operator is looking for additional solutions to reduce peak power, because existing approaches (mainly building new intervention power unit or tariff programs) are not satisfactory due to the high cost of services in combination with insufficient power reduction effect. The paper presents an approach to load shifting with the use of home Energy Management System (EMS) installed at small end-users. The home energy management algorithm, executed by EMS controller, is modeled using Unified Modeling Language (UML). Then, the UML model is translated into Verilog description, and is finally implemented in the Field Programmable Gate Arrays. The advantages of the proposed approach are the relatively low cost of reduction service, small loss of end-users' comfort, and the convenient maintenance of EMS. A practical example illustrating the proposed approach and calculation of potential gains from its implementation are also presented.

  20. Mark II containment lead plant program load evaluation and acceptance criteria

    International Nuclear Information System (INIS)

    1978-10-01

    The report, prepared by the Office of Nuclear Reactor Regulation, addresses the portion of the Mark II owner's program that provides a generic methodology for establishing design basis LOCA and safety relief valve loads for the lead Mark II facilities (Zimmer, Shoreham, and LaSalle), i.e., the lead plant program. The report includes an evaluation of the Mark II owner's load methodology, a description of load methodologies that we find acceptable for use in the individual plant unique assessments, and the basis for the stated conclusions

  1. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Science.gov (United States)

    2010-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... airworthiness maintenance program use by fractional ownership program manager. Fractional ownership program... through 91.1443. Any program manager who elects to maintain the program aircraft using a continuous...

  2. Efficient Load Forecasting Optimized by Fuzzy Programming and OFDM Transmission

    Directory of Open Access Journals (Sweden)

    Sandeep Sachdeva

    2011-01-01

    reduce the error of load forecasting, fuzzy method has been used with Artificial Neural Network (ANN and OFDM transmission is used to get data from outer world and send outputs to outer world accurately and quickly. The error has been reduced to a considerable level in the range of 2-3%. For further reducing the error, Orthogonal Frequency Division Multiplexing (OFDM can be used with Reed-Solomon (RS encoding. Further studies are going on with Fuzzy Regression methods to reduce the error more.

  3. Applied Knowledge Management to Mitigate Cognitive Load in Network-Enabled Mission Command

    Science.gov (United States)

    2017-11-22

    ARL-TN-0859 ● NOV 2017 US Army Research Laboratory Applied Knowledge Management to Mitigate Cognitive Load in Network-Enabled...Applied Knowledge Management to Mitigate Cognitive Load in Network-Enabled Mission Command by John K Hawley Human Research and Engineering...REPORT TYPE Technical Note 3. DATES COVERED (From - To) 1 May 2016–20 April 2017 4. TITLE AND SUBTITLE Applied Knowledge Management to Mitigate

  4. Transuranic waste management program waste form development

    International Nuclear Information System (INIS)

    Bennett, W.S.; Crisler, L.R.

    1981-01-01

    To ensure that all technology necessary for long term management of transuranic (TRU) wastes is available, the Department of Energy has established the Transuranic Waste Management Program. A principal focus of the program is development of waste forms that can accommodate the very diverse TRU waste inventory and meet geologic isolation criteria. The TRU Program is following two approaches. First, decontamination processes are being developed to allow removal of sufficient surface contamination to permit management of some of the waste as low level waste. The other approach is to develop processes which will allow immobilization by encapsulation of the solids or incorporate head end processes which will make the solids compatible with more typical waste form processes. The assessment of available data indicates that dewatered concretes, synthetic basalts, and borosilicate glass waste forms appear to be viable candidates for immobilization of large fractions of the TRU waste inventory in a geologic repository

  5. The Marshall Islands Data Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project.

  6. The Marshall Islands Data Management Program

    International Nuclear Information System (INIS)

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project

  7. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  8. Who should pay for demand-side management programs?

    International Nuclear Information System (INIS)

    Flaim, T.

    1992-01-01

    Traditional utility resource planning involves taking the load forecast as a given and then determining the additional supply resources expected to serve that load at minimum cost and optimal levels of reliability. With integrated planning, the goal is still to balance supply and demand, but in a way that is most cost effective given all possible ways to serve customers' energy service needs. The new element in integrated resource planning is demand side management (DSM) or activities aimed at altering the quantity of energy customers use and/or the timing of their consumption. This paper discusses how DSM works to accomplish energy conservation and how it affects the rate structure. It also goes on to discuss how a utility can optimize the participation in a conservation program so that no particular group might have to carry the brunt of a rate increase. These suggestions include aligning rates to accurately reflect marginal costs; require participating customers to pay as many program costs as are possible; where participating customers can't pay full cost of a program, restrict costs to those groups who are eligible to participate; and offer a 'reverse shared-savings' program to the largest customers. The paper goes on to discuss electric-to-gas fuel switching and what customers should carry the cost burden for this type of switching

  9. Development of a self-managed loaded exercise programme for rotator cuff tendinopathy.

    Science.gov (United States)

    Littlewood, Chris; Malliaras, Peter; Mawson, Sue; May, Stephen; Walters, Stephen

    2013-12-01

    This paper describes a self-managed loaded exercise programme which has been designed to address the pain and disability associated with rotator cuff tendinopathy. The intervention has been developed with reference to current self-management theory and with reference to the emerging benefit of loaded exercise for tendinopathy. This self-managed loaded exercise programme is being evaluated within the mixed methods SELF study (ISRCTN 84709751) which includes a pragmatic randomised controlled trial conducted within the UK National Health Service. Copyright © 2012 Chartered Society of Physiotherapy. Published by Elsevier Ltd. All rights reserved.

  10. Hanford Site grundwater protection management program

    International Nuclear Information System (INIS)

    1989-10-01

    Groundwater protection has emerged over the past few years as a national priority that has been promulgated in a variety of environmental regulations at both the state and federal level. In order to effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy (DOE) requires all DOE facilities to prepare separate groundwater protection program descriptions and plans (groundwater activities were formerly included as a subpart of environmental protection programs). This document is for the Hanford Site located in the state of Washington. The DOE Order specifies that the groundwater protection management program cover the following general topical areas: (1) documentation of the groundwater regime, (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. 14 refs., 19 figs., 2 tabs

  11. Pediatric CT quality management and improvement program

    Energy Technology Data Exchange (ETDEWEB)

    Larson, David B.; Chan, Frandics P.; Newman, Beverley; Fleischmann, Dominik [Stanford University School of Medicine, Department of Radiology, Stanford, CA (United States); Molvin, Lior Z. [Stanford Hospital and Clinics, Stanford, CA (United States); Wang, Jia [Stanford University, Environmental Health and Safety, Stanford, CA (United States)

    2014-10-15

    Modern CT is a powerful yet increasingly complex technology that continues to rapidly evolve; optimal clinical implementation as well as appropriate quality management and improvement in CT are challenging but attainable. This article outlines the organizational structure on which a CT quality management and improvement program can be built, followed by a discussion of common as well as pediatric-specific challenges. Organizational elements of a CT quality management and improvement program include the formulation of clear objectives; definition of the roles and responsibilities of key personnel; implementation of a technologist training, coaching and feedback program; and use of an efficient and accurate monitoring system. Key personnel and roles include a radiologist as the CT director, a qualified CT medical physicist, as well as technologists with specific responsibilities and adequate time dedicated to operation management, CT protocol management and CT technologist education. Common challenges in managing a clinical CT operation are related to the complexity of newly introduced technology, of training and communication and of performance monitoring. Challenges specific to pediatric patients include the importance of including patient size in protocol and dose considerations, a lower tolerance for error in these patients, and a smaller sample size from which to learn and improve. (orig.)

  12. Pediatric CT quality management and improvement program

    International Nuclear Information System (INIS)

    Larson, David B.; Chan, Frandics P.; Newman, Beverley; Fleischmann, Dominik; Molvin, Lior Z.; Wang, Jia

    2014-01-01

    Modern CT is a powerful yet increasingly complex technology that continues to rapidly evolve; optimal clinical implementation as well as appropriate quality management and improvement in CT are challenging but attainable. This article outlines the organizational structure on which a CT quality management and improvement program can be built, followed by a discussion of common as well as pediatric-specific challenges. Organizational elements of a CT quality management and improvement program include the formulation of clear objectives; definition of the roles and responsibilities of key personnel; implementation of a technologist training, coaching and feedback program; and use of an efficient and accurate monitoring system. Key personnel and roles include a radiologist as the CT director, a qualified CT medical physicist, as well as technologists with specific responsibilities and adequate time dedicated to operation management, CT protocol management and CT technologist education. Common challenges in managing a clinical CT operation are related to the complexity of newly introduced technology, of training and communication and of performance monitoring. Challenges specific to pediatric patients include the importance of including patient size in protocol and dose considerations, a lower tolerance for error in these patients, and a smaller sample size from which to learn and improve. (orig.)

  13. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  14. Optimization programs for reactor core fuel loading exhibiting reduced neutron leakage

    International Nuclear Information System (INIS)

    Darilek, P.

    1991-01-01

    The program MAXIM was developed for the optimization of the fuel loading of WWER-440 reactors. It enables the reactor core reactivity to be maximized by modifying the arrangement of the fuel assemblies. The procedure is divided into three steps. The first step includes the passage from the three-dimensional model of the reactor core to the two-dimensional model. In the second step, the solution to the problem is sought assuming that the multiplying properties, or the reactivity in the zones of the core, vary continuously. In the third step, parameters of actual fuel assemblies are inserted in the ''continuous'' solution obtained. Combined with the program PROPAL for a detailed refinement of the loading, the program MAXIM forms a basis for the development of programs for the optimization of fuel loading with burnable poisons. (Z.M.). 16 refs

  15. Plant lifetime management and research program

    International Nuclear Information System (INIS)

    Sakai, K.; Nagayama, M.

    1993-01-01

    The importance of nuclear power generation has been increasing in Japan. Because the lower generation cost and more stable fuel supply, in comparison with the case of fossil plants, are beneficial to Japan which has scarce natural resources. In addition, nuclear power generation is expected to help reduce carbon dioxide emission which causes global warming. In these circumstances, the safe and stable operations of nuclear power plants are of prime importance, and the frequency of unscheduled shutdown has been kept low in Japan as a result of thorough periodic inspections supported by aging management. This paper covers the development process of the aging management program and related research programs in The Kansai Electric Power Co., Inc. (KEPCO). KEPCO runs 11 nuclear power units (PWR). A Table shows the commencement date of commercial operation and operating hours for each unit. The early plants, such as Mihama-2 Unit, have been operated for more than 100,000 hours and are in the phase of aging management. Accordingly, we have been conducting aging management programs since 1987. in order to identify age-related degradation and work out countermeasures.The aging management programs have ensured safe and stable operation of nuclear power plants. Each result of the lifetime assessment has provided the information which helps establishing maintenance programs. For example, the result of the lifetime assessment has been reflected to the intervals of overhaulings and inspections, and the replacement timing of some components. In the future activities of aging management should be revised and should focus lifetime assessment on components which provoke difficulties in inspections because of high radiation exposure or high inspection cost

  16. Advanced Power Management of a Telehandler using Electronic Load Sensing

    DEFF Research Database (Denmark)

    Hansen, Rico Hjerm

    2009-01-01

    New possibilities within electronic control of mobile hydraulic systems are becoming available as hydraulic components are implemented with more electrical sensors and actuators. This paper presents how the traditional hydro-mechanical load sensing (HLS) control of a specific mobile hydraulic...... application, a telehandler, can be replaced with electronic control, i.e. Electronic Load Sensing (ELS). The motivation for ELS is the potentials of better dynamic performance and system utilization, along with reduced mechanical complexity by transferring features as pump pressure control, flow...

  17. Development and characterization of morin hydrate loaded microemulsion for the management of Alzheimer's disease.

    Science.gov (United States)

    Sharma, Dheeraj; Singh, Manpreet; Kumar, Punnet; Vikram, Vir; Mishra, Neeraj

    2017-12-01

    The aim of this study is to prepare and characterize intranasal delivery of morin hydrate loaded microemulsion for the management of Alzheimer's diseases. After intranasal delivery, brain and blood drug concentrations were found to be higher for optimized morin hydrate loaded microemulsion as compared to plain morin hydrate. Significant (P microemulsion as compared to sham control group. Daily chronic treatment with morin loaded microemulsion till the 21st day significantly increased the memory in wistar rats with STZ-induced dementia.

  18. Prioritized rule based load management technique for residential building powered by PV/battery system

    Directory of Open Access Journals (Sweden)

    T.R. Ayodele

    2017-06-01

    Full Text Available In recent years, Solar Photovoltaic (PV system has presented itself as one of the main solutions to the electricity poverty plaguing the majority of buildings in rural communities with solar energy potential. However, the stochasticity associated with solar PV power output owing to vagaries in weather conditions is a major challenge in the deployment of the systems. This study investigates approach for maximizing the benefits of a Stand-Alone Photovoltaic-Battery (SAPVB system via techniques that provide for optimum energy gleaning and management. A rule-based load management scheme is developed and tested for a residential building. The approach allows load prioritizing and shifting based on certain rules. To achieve this, the residential loads are classified into Critical Loads (CLs and Uncritical Loads (ULs. The CLs are given higher priority and therefore are allowed to operate at their scheduled time while the ULs are of less priority, hence can be shifted to a time where there is enough electric power generation from the PV arrays rather than the loads being operated at the time period set by the user. Four scenarios were created to give insight into the applicability of the proposed rule based load management scheme. The result revealed that when the load management technique is not utilized as in the case of scenario 1 (Base case, the percentage satisfaction of the critical and uncritical loads by the PV system are 49.8% and 23.7%. However with the implementation of the load management scheme in scenarios 2, 3 and 4, the percentage satisfaction of the loads (CLs, ULs are (93.8%, 74.2%, (90.9%, 70.1% and (87.2%, 65.4% for scenarios 2, 3 and 4, respectively.

  19. 78 FR 7477 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2013-02-01

    ... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...

  20. Abstracts: NRC Waste Management Program reports

    Energy Technology Data Exchange (ETDEWEB)

    Heckman, R.A.; Minichino, C.

    1979-11-01

    This document consists of abstracts of all reports published by the Nuclear Regulatory Commission (NRC) Waste Management Program at Lawrence Livermore Laboratory (LLL). It will be updated at regular intervals. Reports are arranged in numerical order, within each category. Unless otherwise specified, authors are LLL scientists and engineers.

  1. Parents are Teachers: A Child Management Program.

    Science.gov (United States)

    Becker, Wesley C.

    This manual is designed to help parents apply reinforcement theory in managing their children. The program explains how parents can systematically use consequences to teach children in positive ways. Units include: When to Reinforce; How to Reinforce; Reinforcement and Punishment in Everyday Life; and Why Parents (and Teachers) Goof; the Criticism…

  2. Abstracts: NRC Waste Management Program reports

    International Nuclear Information System (INIS)

    Heckman, R.A.; Minichino, C.

    1979-11-01

    This document consists of abstracts of all reports published by the Nuclear Regulatory Commission (NRC) Waste Management Program at Lawrence Livermore Laboratory (LLL). It will be updated at regular intervals. Reports are arranged in numerical order, within each category. Unless otherwise specified, authors are LLL scientists and engineers

  3. The Canadian fuel waste management program

    International Nuclear Information System (INIS)

    McConnell, D.B.

    1986-04-01

    This report is the sixth in the series of annual reports on the research and development program for the safe management and disposal of Canada's nuclear fuel waste. The report summarizes progress in 1984 for the following activities: storage and transportation of used fuel, immobilization of nuclear fuel waste, geotechnical research, environmental research, and environmental and safety assessment. 186 refs

  4. Cash Management Program Reaps Financial Rewards.

    Science.gov (United States)

    Saylor, Joan Nesenkar

    1984-01-01

    Basic components of a New Jersey district's profitable cash management program include consolidating funds using a negotiated bank agreement, a short term investment policy, accurate flowcharts for precise planning, and revenue and expenditure analysis. Data collection and analysis and the alternative of using a bank service agreement are…

  5. Sandia National Laboratories, California Waste Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2010-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  6. Sandia National Laboratories, California Hazardous Materials Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2011-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  7. Load Management in Residential Buildings Considering Techno-Economic and Environmental Aspects

    Energy Technology Data Exchange (ETDEWEB)

    Abaravicius, Juozas

    2004-12-01

    Load problems in electricity markets occur both on the supply and demand side and can have technical, economic and even political causes. Commonly, such problems have been solved by expanding production and/or distribution capacity, importing electricity or by load management. Load management is a techno-economic measure for harmonizing the relations between supply and demand sides, optimizing power generation and transmission and increasing security of supply. Interest in load management differs depending on the perspective of the actors involved: from customer, utility, or producer to state policy maker. The problem of load demand and load management in residential sector is in this thesis approached from different perspectives, i.e. technical, economic, and environmental. The study does not go deep into detailed analyses of each perspective, but rather aims to establish and analyze the links between them. This trans-disciplinary approach is the key methodological moment used in the research work performed by the research group for load management in buildings at the Lund Institute of Technology. The key objective of this study is to analyze load demand variation and load management possibilities in residential sector, particularly detached and semi-detached houses, to experimentally test and analyze the conditions and potential of direct load management from customer and utility viewpoint. Techno-economic and environmental aspects are investigated. The study was performed in collaboration with one electric utility in Southern Sweden. Ten electric-heated houses were equipped with extra meters, enabling hourly load measurements for heating, hot water and total electricity use. Household heating and hot water systems were controlled by the utility using an existing remote reading and monitoring system. The residents noticed some of the control periods, although they didn't express any larger discomfort. The experiments proved that direct load management might

  8. Knowledge is power: Customer load metering in the Victorian End-Use Measurement Program

    Energy Technology Data Exchange (ETDEWEB)

    Gavin, G. [CitiPower Ltd., Melbourne, VIC (Australia)

    1995-12-31

    The Victorian End-Use Measurement Program is a sophisticated load metering program being conducted over 500 sites in Victoria, covering the major customer sectors of residential, commercial and industrial. Its goal is to gather sufficient data to determine with statistical accuracy the load profiles of these major sectors, together with the load profiles of selected customer end-uses in the residential and commercial sectors, and selected building types in the commercial sector. This paper discusses the major elements of the program, the history of its development, the design of the statistical and operational components of the program, and its implementation in the field. In the Victorian electricity industry, with the combination of contestable customer metering and the End-Use Measurement program metering for the franchise/non-contestable market, there is now a considerable flow of customer load data. The opportunity exists for an accurate understanding of customer load needs, and the minimization of risk in business operations in the retail and wholesale market. (author).

  9. Alternative approach to automated management of load flow in engineering networks considering functional reliability

    Directory of Open Access Journals (Sweden)

    Ирина Александровна Гавриленко

    2016-02-01

    Full Text Available The approach to automated management of load flow in engineering networks considering functional reliability was proposed in the article. The improvement of the concept of operational and strategic management of load flow in engineering networks was considered. The verbal statement of the problem for thesis research is defined, namely, the problem of development of information technology for exact calculation of the functional reliability of the network, or the risk of short delivery of purpose-oriented product for consumers

  10. 14 CFR 91.1003 - Management contract between owner and program manager.

    Science.gov (United States)

    2010-01-01

    ... program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager. Each owner must have a contract with the program manager that— (a) Requires the program manager to...

  11. Thermal Energy Storage for Building Load Management: Application to Electrically Heated Floor

    Directory of Open Access Journals (Sweden)

    Hélène Thieblemont

    2016-07-01

    Full Text Available In cold climates, electrical power demand for space conditioning becomes a critical issue for utility companies during certain periods of the day. Shifting a portion or all of it to off-peak periods can help reduce peak demand and reduce stress on the electrical grid. Sensible thermal energy storage (TES systems, and particularly electrically heated floors (EHF, can store thermal energy in buildings during the off-peak periods and release it during the peak periods while maintaining occupants’ thermal comfort. However, choosing the type of storage system and/or its configuration may be difficult. In this paper, the performance of an EHF for load management is studied. First, a methodology is developed to integrate EHF in TRNSYS program in order to investigate the impact of floor assembly on the EHF performance. Then, the thermal comfort (TC of the night-running EHF is studied. Finally, indicators are defined, allowing the comparison of different EHF. Results show that an EHF is able to shift 84% of building loads to the night while maintaining acceptable TC in cold climate. Moreover, this system is able to provide savings for the customer and supplier if there is a significant difference between off-peak and peak period electricity prices.

  12. Peak-load management, the security of supply warranty

    International Nuclear Information System (INIS)

    2010-01-01

    Even if France owns an efficient power generation park, largely exporting and clean (90% with no CO 2 emission), it encounters some difficulties during peak-load periods. The successive peak power demand records which are recorded each year represent as many alerts about a possible collapse of the power system. In order to warrant the electricity supply, the present day regulatory framework must be changed to allow the industrial players to carry out the necessary investments

  13. A loading pattern optimization method for nuclear fuel management

    International Nuclear Information System (INIS)

    Argaud, J.P.

    1997-01-01

    Nuclear fuel reload of PWR core leads to the search of an optimal nuclear fuel assemblies distribution, namely of loading pattern. This large discrete optimization problem is here expressed as a cost function minimization. To deal with this problem, an approach based on gradient information is used to direct the search in the patterns discrete space. A method using an adjoint state formulation is then developed, and final results of complete patterns search tests by this method are presented. (author)

  14. An optimal control model for load shifting - With application in the energy management of a colliery

    International Nuclear Information System (INIS)

    Middelberg, Arno; Zhang Jiangfeng; Xia Xiaohua

    2009-01-01

    This paper presents an optimal control model for the load shifting problem in energy management and its application in a South African colliery. It is illustrated in the colliery scenario that how the optimal control model can be applied to optimize load shifting and improve energy efficiency through the control of conveyor belts. The time-of-use electricity tariff is used as an input to the objective function in order to obtain a solution that minimizes electricity costs and thus maximizes load shifting. The case study yields promising results that show the potential of applying this optimal control model to other industrial Demand Side Management initiatives

  15. Operation and Management of Thermostatically Controlled Loads for Providing Regulation Services to Power Grids

    Science.gov (United States)

    Vanouni, Maziar

    The notion of demand-side participation in power systems operation and control is on the verge of realization because of the advancement in the required technologies an tools like communications, smart meters, sensor networks, large data management techniques, large scale optimization method, etc. Therefore, demand-response (DR) programs can be one of the prosperous solutions to accommodate part of the increasing demand for load balancing services which is brought about by the high penetration of intermittent renewable energies in power systems. This dissertation studies different aspects of the DR programs that utilized the thermostatically controlled loads (TCLs) to provide load balancing services. The importance of TCLs among the other loads lie on their flexibility in power consumption pattern while the customer/end-user comfort is not (or minimally) impacted. Chapter 2 discussed a previously presented direct load control (DLC) to control the power consumption of aggregated TCLs. The DLC method performs a power tracking control and based on central approach where a central controller broadcasts the control command to the dispersed TCLs to toggle them on/off. The central controller receives measurement feedback from the TCLs once per couple of minutes to run a successful forecast process. The performance evaluation criteria to evaluate the load balancing service provided by the TCLs are presented. The results are discussed under different scenarios and situation. The numerical results show the proper performance of the DLC method. This DLC method is used as the control method in all the studies in this dissertation. Chapter 3 presents performance improvements for the original method in Chapter 2 by communicating two more pieces of information called forecast parameters (FPs). Communicating improves the forecast process in the DLC and hence, both performance accuracy and the amount of tear-and-wear imposed on the TCLs. Chapter 4 formulates a stochastic

  16. 20 CFR 632.76 - Program management systems.

    Science.gov (United States)

    2010-04-01

    ... management and participant tracking systems in accordance with § 632.32 and § 632.77. The principal... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management systems. 632.76 Section... NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Design and Management § 632.76 Program...

  17. A comparison of four methods to evaluate the effect of a utility residential air-conditioner load control program on peak electricity use

    Energy Technology Data Exchange (ETDEWEB)

    Newsham, Guy R., E-mail: guy.newsham@nrc-cnrc.gc.ca [National Research Council Canada-Institute for Research in Construction, Building M24, 1200 Montreal Road, Ottawa, Ontario, K1A 0R6 (Canada); Birt, Benjamin J. [National Research Council Canada-Institute for Research in Construction, Building M24, 1200 Montreal Road, Ottawa, Ontario, K1A 0R6 (Canada); Rowlands, Ian H. [University of Waterloo, Ontario (Canada)

    2011-10-15

    We analyzed the peak load reductions due to a residential direct load control program for air-conditioners in southern Ontario in 2008. In this program, participant thermostats were increased by 2 deg. C for four hours on five event days. We used hourly, whole-house data for 195 participant households and 268 non-participant households, and four different methods of analysis ranging from simple spreadsheet-based comparisons of average loads on event days, to complex time-series regression. Average peak load reductions were 0.2-0.9 kWh/h per household, or 10-35%. However, there were large differences between event days and across event hours, and in results for the same event day/hour, with different analysis methods. There was also a wide range of load reductions between individual households, and only a minority of households contributed to any given event. Policy makers should be aware of how the choice of an analysis method may affect decisions regarding which demand-side management programs to support, and how they might be incentivized. We recommend greater use of time-series methods, although it might take time to become comfortable with their complexity. Further investigation of what type of households contribute most to aggregate load reductions would also help policy makers better target programs. - Highlights: > We analyzed peak load reductions due to residential a/c load control. > We used four methods, ranging from simple comparisons to time-series regression. > Average peak load reductions were 0.2-0.9 kW per household, varying by method. > We recommend a move towards time-series regression for future studies. > A minority of participant households contributed to a given load control event.

  18. Research waste management program - An action proposal

    International Nuclear Information System (INIS)

    Costa Ramos, A.; Esposito, I.

    1997-01-01

    The Brazilian Nuclear Energy Commission planned prepared and established a Research Waste Management Program, started in 1996, in order to map, to analyze and to solve the common problems in the research field. The specific study done included a large number of academic institutions. The procedures, results and operational methodology used by the Team linked to the Program, in one of the research institutions studied where corrective actions were implemented to avoid unnecessary dose to the public, will be discussed in this article. (author)

  19. 76 FR 34541 - Child and Adult Care Food Program Improving Management and Program Integrity

    Science.gov (United States)

    2011-06-13

    ... 7 CFR Parts 210, 215, 220 et al. Child and Adult Care Food Program Improving Management and Program..., 220, 225, and 226 RIN 0584-AC24 Child and Adult Care Food Program Improving Management and Program... management and integrity in the Child and Adult Care Food Program (CACFP), at 67 FR 43447 (June 27, 2002) and...

  20. Economic profitability analysis of demand side management program

    International Nuclear Information System (INIS)

    Sheen, J.N.

    2005-01-01

    This study considers both the internal and external costs of the utility in deriving the avoided capacity cost (ACC) and avoided operating cost (AOC) induced in an electric utility caused by the implementation of a demand side management program (DSM). In calculating the ACC, a multiple objective linear programming model is developed. Meanwhile, the AOC is calculated by considering the differences between the total and specific time period energy consumption ratios before and after the implementation of the DSM program. This study also develops an economic analysis method using Net Present Value and Pay Back Year models to assess the economic profitability of implementing a DSM program from a participant's point of view. The design and construction of a partial load leveling eutectic salt Cooling Energy Storage (CES) air conditioning system in a target office building in Kaohsiung, Taiwan, is discussed in order to simulate the cost benefit of the CES system from the perspective of the utility and from that of the participant. The results confirm the effectiveness of the developed models in simulating the economic benefits of implementing a DSM program from the perspectives of both the utility and the participant

  1. Reduced-Order Models for Load Management in the Power Grid

    Science.gov (United States)

    Alizadeh, Mahnoosh

    In recent years, considerable research efforts have been directed towards designing control schemes that can leverage the inherent flexibility of electricity demand that is not tapped into in today's electricity markets. It is expected that these control schemes will be carried out by for-profit entities referred to as aggregators that operate at the edge of the power grid network. While the aggregator control problem is receiving much attention, more high-level questions of how these aggregators should plan their market participation, interact with the main grid and with each other, remain rather understudied. Answering these questions requires a large-scale model for the aggregate flexibility that can be harnessed from the a population of customers, particularly for residences and small businesses. The contribution of this thesis towards this goal is divided into three parts: In Chapter 3, a reduced-order model for a large population of heterogeneous appliances is provided by clustering load profiles that share similar degrees of freedom together. The use of such reduced-order model for system planning and optimal market decision making requires a foresighted approximation of the number of appliances that will join each cluster. Thus, Chapter 4 provides a systematic framework to generate such forecasts for the case of Electric Vehicles, based on real-world battery charging data. While these two chapters set aside the economic side that is naturally involved with participation in demand response programs and mainly focus on the control problem, Chapter 5 is dedicated to the study of optimal pricing mechanisms in order to recruit heterogeneous customers in a demand response program in which an aggregator can directly manage their appliances' load under their specified preferences. Prices are proportional to the wholesale market savings that can result from each recruitment event.

  2. Health risk assessment for program managers

    International Nuclear Information System (INIS)

    Jump, R.A.; Williamson, D.S.

    1994-01-01

    This paper presents the findings of a sensitivity analysis into the independent variables that determine the levels of health risks posed by buried plutonium and americium at a typical contaminated site in an arid region. Environmental Restoration Program Managers often must make decisions concerning cleanup levels, remediation alternatives, schedules, cost estimates, etc. based upon extraordinarily safe assumptions about risk assessment calculation inputs. This study reveals to the Program Manager which variables are major drivers to the calculated levels of risk posed by transuranic radionuclides and which ones have second order effects or less. The findings of this study should indicate which inputs should be the focus of attention during negotiations with regulators and of further empirical investigation

  3. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Dixon, R.S.; Rosinger, E.L.J.

    1984-04-01

    This report, the fifth of a series of annual reports, reviews the progress that has been made in the research and development program for the safe management and disposal of Canada's nuclear fuel waste. The report summarizes activities over the past year in the following areas: public interaction; used fuel storage and transportation; immobilization of used fuel and fuel recycle waste; geoscience research related to deep underground disposal; environmental research; and environmental and safety assessment

  4. Waste management in Canadian nuclear programs

    International Nuclear Information System (INIS)

    Dyne, P.J.

    The objectives of the Canadian radioactive waste management program are described. Recycling actinides through reactors is being studied. Low and medium level waste treatments such as reverse osmosis concentration, immobilization in bitumen and plastics, and incineration are under study. Spent fuel can be stored dry in concrete canisters above ground and ultimate storage of wastes in salt deposits or hard rock is appropriate to Canadian conditions. (E.C.B.)

  5. 1998 Environmental Management Science Program Annual Report

    International Nuclear Information System (INIS)

    1999-01-01

    The Environmental Management Science Program (EMSP) is a collaborative partnership between the DOE Office of Environmental Management (EM), Office of Science (DOE-SC), and the Idaho Operations Office (DOE-ID) to sponsor basic environmental and waste management related research. Results are expected to lead to reduction of the costs, schedule, and risks associated with cleaning up the nation's nuclear complex. The EMSP research portfolio addresses the most challenging technical problems of the EM program related to high level waste, spent nuclear fuel, mixed waste, nuclear materials, remedial action, decontamination and decommissioning, and health, ecology, or risk. The EMSP was established in response to a mandate from Congress in the fiscal year 1996 Energy and Water Development Appropriations Act. Congress directed the Department to ''provide sufficient attention and resources to longer-term basic science research which needs to be done to ultimately reduce cleanup costs, develop a program that takes advantage of laboratory and university expertise, and seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective''. This mandate followed similar recommendations from the Galvin Commission to the Secretary of Energy Advisory Board. The EMSP also responds to needs identified by National Academy of Sciences experts, regulators, citizen advisory groups, and other stakeholders

  6. Transuranic waste management program and facilities

    International Nuclear Information System (INIS)

    Clements, T.L. Jr.; Cook, L.A.; Stallman, R.M.; Hunter, E.K.

    1986-01-01

    Since 1954, defense-generated transuranic (TRU) waste has been received at the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). Prior to 1970, approximately 2.2 million cubic feet of transuranic waste were buried in shallow-land trenches and pits at the RWMC. Since 1970, an additional 2.1 million cubic feet of waste have been retrievably stored in aboveground engineered confinement. A major objective of the Department of Energy (DOE) Nuclear Waste Management Program is the proper management of defense-generated transuranic waste. Strategies have been developed for managing INEL stored and buried transuranic waste. These strategies have been incorporated in the Defense Waste Management Plan and are currently being implemented with logistical coordination of transportation systems and schedules for the Waste Isolation Pilot Plant (WIPP). The Stored Waste Examination Pilot Plant (SWEPP) is providing nondestructive examination and assay of retrievably stored, contact-handled TRU waste. Construction of the Process Experimental Pilot Plant (PREPP) was recently completed, and PREPP is currently undergoing system checkout. The PRFPP will provide processing capabilities for contact-handled waste not meeting WIPP-Waste Acceptance Criteria (WAC). In addition, ongoing studies and technology development efforts for managing the TRU waste such as remote-handled and buried TRU waste, are being conducted

  7. Transuranic Waste Management Program and Facilities

    International Nuclear Information System (INIS)

    Clements, T.L. Jr.; Cook, L.A.; Stallman, R.M.; Hunter, E.K.

    1986-02-01

    Since 1954, defense-generated transuranic (TRU) waste has been received at the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). Prior to 1970, approximately 2.2 million cubic feet of transuranic waste were buried in shallow-land trenches and pits at the RWMC. Since 1970, an additional 2.1 million cubic feet of waste have been retrievably stored in aboveground engineered confinement. A major objective of the Department of Energy (DOE) Nuclear Waste Management Program is the proper management of defense-generated transuranic waste. Strategies have been developed for managing INEL stored and buried transuranic waste. These strategies have been incorporated in the Defense Waste Management Plan and are currently being implemented with logistical coordination of transportation systems and schedules for the Waste Isolation Pilot Plant (WIPP). The Stored Waste Examination Pilot Plant (SWEPP) is providing nondestructive examination and assay of retrievably stored, contact-handled TRU waste. Construction of the Process Experimental Pilot Plant (PREPP) was recently completed, and PREPP is currently undergoing system checkout. The PREPP will provide processing capabilities for contact-handled waste not meeting WIPP-Waste Acceptance Criteria (WAC). In addition, ongoing studies and technology development efforts for managing the TRU waste such as remote-handled and buried TRU waste, are being conducted

  8. Spatial optimization of watershed management practices for nitrogen load reduction using a modeling-optimization framework

    Science.gov (United States)

    Best management practices (BMPs) are perceived as being effective in reducing nutrient loads transported from non-point sources (NPS) to receiving water bodies. The objective of this study was to develop a modeling-optimization framework that can be used by watershed management p...

  9. Dynamic load management in a smart home to participate in demand response events

    DEFF Research Database (Denmark)

    Fernandes, Filipe; Morais, Hugo; Vale, Zita

    2014-01-01

    In future power systems, in the smart grid and microgrids operation paradigms, consumers can be seen as an energy resource with decentralized and autonomous decisions in the energy management. It is expected that each consumer will manage not only the loads, but also small generation units, heat...

  10. The NPP Isar comprehensive Aging Management Program

    International Nuclear Information System (INIS)

    Zander, Andre; Ertl, Stefan

    2012-01-01

    The majority of System, Structure and Components (SSC) in a nuclear power plants are designed to experience a service life, which is far above the intended design life. In most cases, only a small percentage of SSCs are subject to significant aging effects, which may affect the integrity or the function of the component. The process of aging management (AM) has the objective to monitor and control degradation effects which may compromise safety functions of the plant. And furthermore, to ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects. Safety-related aspects and the targeted high availability of the power plant as well as the requirements stipulated by German regulatory authorities prompted the operator of NPP ISAR to introduce an aging surveillance program. The NPP Isar as well as the German NPPs has to be following in the scope of aging management the KTA 1403 guideline. The NPP Isar surveillance program based on the KTA 1403 guideline covers the following aspects: - Scoping and screening of safety relevant Systems, Structures and Components (SSC); - Identification of possible degradation mechanisms for safety relevant SSC; - Ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects; - Transferability check of industry experience (internal and external events); - Annual preparation of an AM status report. (author)

  11. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management

    International Nuclear Information System (INIS)

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management

  12. Effects of interruptible load program on equilibrium outcomes of electricity markets with wind power

    Energy Technology Data Exchange (ETDEWEB)

    An, Xuena; Zhang, Shaohua; Li, Xue [Shanghai Univ. (China). Key Lab. of Power Station Automation Technology

    2013-07-01

    High wind power penetration presents a lot of challenges to the flexibility and reliability of power system operation. In this environment, various demand response (DR) programs have got much attention. As an effective measure of demand response programs, interruptible load (IL) programs have been widely used in electricity markets. This paper addresses the problem of impacts of the IL programs on the equilibrium outcomes of electricity wholesale markets with wind power. A Cournot equilibrium model of wholesale markets with wind power is presented, in which IL programs is included by a market demand model. The introduction of the IL programs leads to a non-smooth equilibrium problem. To solve this equilibrium problem, a novel solution method is proposed. Numerical examples show that IL programs can lower market price and its volatility significantly, facilitate the integration of wind power.

  13. Road traffic management based on self-load-balancing approach

    Directory of Open Access Journals (Sweden)

    Adnane Ahmed

    2016-01-01

    Full Text Available Traffic congestion is one of the most challenging problems for nowadays cities. Several contributions mainly based on V2V (Vehicle-to-Vehicle communication have been published, but most of them have never been applied due to their communication related problems and costs. In this article, a novel cost-effective approach is introduced inspired by social life of insects where direct (V2V communication does not exist anymore. Vehicles are equipped with devices that perform simple tasks, but their interactions with the environment through RSUs (Road Side Units allow the creation of an intelligence which notifies drivers about congested road segments to avoid them. We call this emerging behavior self-load balancing. Description of the fundamentals of this approach and its performance are detailed in this work.

  14. Managing Cognitive Load in Adaptive ICT-Based Learning

    Directory of Open Access Journals (Sweden)

    Slava Kalyuga

    2009-10-01

    Full Text Available The history of technological innovations in education has many examples of failed high expectations. To avoid becoming another one, current multimedia ICT tools need to be designed in accordance with how the human mind works. There are well established characteristics of its architecture that should be taken into account when evaluating, selecting, and using educational technology. This paper starts with a review of the most important features of human cognitive architecture and their implications for ICT-based learning. Expertise reversal effect relates to the interactions between levels of learner prior knowledge and effectiveness of different instructional techniques and procedures. Designs and techniques that are effective with low-knowledge learners can lose their effectiveness and even have negative consequences for more proficient learners. The paper describes recent empirical findings associated with the expertise reversal effect in multimedia and hypermedia learning environments, their interpretation within a cognitive load framework, and implications for the design of learner-tailored multimedia.

  15. Optimized load sharing control by means of thermal reliability management

    DEFF Research Database (Denmark)

    Nesgaard, Carsten; Andersen, Michael Andreas E.

    2004-01-01

    time and system cost. However, due to non-ideal parts each converter unit deviates from the ideal case, which makes a power system comprised of parallel-connected converters a rather poor performing system. To account for the non-ideal parts some form of load sharing is needed, whereby it is ensured......With new applications for high-current low-output voltage power systems emerging nearly every day the need for new and cost-efficient power system designs is a matter of course. As output voltage levels continue to decrease an approach that seems more and more attractive is the implementation...... that each converter in the configuration delivers its share of the total output power. In other words parallel-operation of multiple converters is employed when specifications require a highly reliable system, designable within a very short time frame and at low costs. However, to make full use...

  16. 40 CFR Table 2 to Subpart Bbbbbb... - Applicability Criteria, Emission Limits, and Management Practices for Loading Racks

    Science.gov (United States)

    2010-07-01

    ... Limits, and Management Practices for Loading Racks 2 Table 2 to Subpart BBBBBB of Part 63 Protection of... Criteria, Emission Limits, and Management Practices for Loading Racks If you own or operate Then you must 1. A gasoline loading rack(s) at a bulk gasoline terminal with a gasoline throughput of 250,000 gallons...

  17. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  18. University Program Management Information System: NASA's University Program Active Projects

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  19. Program Management Challenges in a Joint Service Environment

    National Research Council Canada - National Science Library

    Taneyhill, Dorothy E

    2007-01-01

    ... or modifications of the same design. The Interim Defense Acquisition Guidebook defines a Joint Program Management Office as any defense acquisition system, subsystem, component, or technology program that involves formal management...

  20. NASA University Program Management Information System

    Science.gov (United States)

    1999-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. (See the bar chart on the next page). This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  1. Using information management to implement a clinical resource management program.

    Science.gov (United States)

    Rosenstein, A H

    1997-12-01

    This article provides a consultant's account of a 250-bed community hospital's experience in implementing the Clinical Resource Management (CRM) program, a four-stage process of using information to identify opportunities for improvement, developing an effective resource management team, implementing process improvement activities, and measuring the impact on outcomes of care. CASE STUDY EXAMPLE--CONGESTIVE HEART FAILURE: The chair of the departments of internal medicine and family practice selected congestive heart failure for in-depth study. A task force focused on treatment and patient disposition in the emergency room (ER), where most of the nonelective admissions originated. A set of standardized ER orders was developed that emphasized rapid and effective diuresis through the initiation of a progressive diuretic dosing schedule directly linked to patient response. Factors critical to the success of the CRM program included allocating adequate time to promote and sell the value and importance of the program, as well as securing the support of both information systems and physicians. The main barriers to success involved limitations in the information system infrastructure and delays attributable to committee review. Short-term results from the CRM program were encouraging, with average lengths of stay reduced by 0.5 days and average costs of care reduced by 12% for the ten diagnoses studied with no adverse results. Nonstudy diagnoses showed no notable improvement. Recognizing the growing importance of information management not only for clinical decision support but for accommodating all the necessary internal and external reporting requirements will require a significant commitment and investment in technology and personnel resources.

  2. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    the Integrated Management System. CM ensures that during the entire operational life of the plant the following requirements are met: · The basic design requirements of the plant are established, documented and maintained; · The physical structures, systems and components (SSCs) of the plant are in conformity with the design requirements; · The physical and functional characteristics of the plant are correctly incorporated in the operational and maintenance documentation, as well as in the documents for testing and training; · The changes in the design documentation are incorporated in the physical configuration and · the operative documentation; · The changes in the design are minimized by management process for review according to approved criteria. The purpose of this report is to try to clarify the place of configuration management program within the Integrated Management System of Kozloduy NPP and to present the computerized information system for organization of the operational activities (IS OOA) as a tool for effective management of the facility. (authors)

  3. NASA University Program Management Information System

    Science.gov (United States)

    2000-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA:s objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA:s Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.* This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  4. Online forecasting of electrical load for distributed management of plug-in electric vehicles

    OpenAIRE

    Basu , Kaustav; Ovalle , Andres; Guo , Baoling; Hably , Ahmad; Bacha , Seddik; Hajar , Khaled

    2016-01-01

    International audience; The paper aims at making online forecast of electrical load at the MV-LV transformer level. Optimal management of the Plug-in Electric Vehicles (PEV) charging requires the forecast of the electrical load for future hours. The forecasting module needs to be online (i.e update and make forecast for the future hours, every hour). The inputs to the predictor are historical electrical and weather data. Various data driven machine learning algorithms are compared to derive t...

  5. A generic hazardous waste management training program

    International Nuclear Information System (INIS)

    Carter, R.J.; Karnofsky, B.

    1988-01-01

    The main purpose of this training program element is to familiarize personnel involved in hazardous waste management with the goals of RCRA and how they are to be achieved. These goals include: to protect health and the environment; to conserve valuable material and energy resources; to prohibit future open dumping on the land; to assure that hazardous waste management practices are conducted in a manner which protects human health and the environment; to insure that hazardous waste is properly managed thereby reducing the need for corrective actions in the future; to establish a national policy to reduce or eliminate the generation of hazardous waste, wherever feasible. Another objective of this progam element is to present a brief overview of the RCRA regulations and how they are implemented/enforced by the Environmental Protection Agency (EPA) and each of the fifty states. This element also discusses where the RCRA regulations are published and how they are updated. In addition it details who is responsible for compliance with the regulations. Finally, this part of the training program provides an overview of the activities and materials that are regulated. 1 ref

  6. Emergency management: Concepts and strategies for effective programs

    OpenAIRE

    Lucus, Valerie

    2007-01-01

    Review of Emergency Management: Concepts and Strategies for Effective Programs By Lucien G. Canton, CEM. By taking a different perspective on local government emergency management programs, this book presents the vision for a very different model--one that includes an independent emergency manager leading an enterprise-wide program focused on strategies that promote disaster resilient communities.

  7. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    Science.gov (United States)

    1997-12-01

    Contracting Officer) and one of her customers (a U. S. Navy Program Manager ). From an examination of this relationship , the most appropriate criteria... Customer Satisfaction, Performance Measurement, Metrics, Contracting, Program Management 17. SECURITY CLASSIFICATION OF REPORT Unclassified...methodology for developing an instrument to measure the satisfaction of their customers , Navy Program Managers . The purpose of this thesis was to develop

  8. 76 FR 42536 - Real-Time System Management Information Program

    Science.gov (United States)

    2011-07-19

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... Real-Time System Management Information Program and general information about current and planned... establishing requirements for the Real-Time System Management Information Program on November 8, 2010, at 75 FR...

  9. 75 FR 68418 - Real-Time System Management Information Program

    Science.gov (United States)

    2010-11-08

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION...) to establish a Real-Time System Management Information Program that provides, in all States, the... traveler information. The purposes of the Real-Time System Management Information Program are to: (1...

  10. Research of the Rio Grande Ecosystem Management Program

    Science.gov (United States)

    Deborah M. Finch

    2000-01-01

    This paper describes the mission, objectives, and preliminary results of the Middle Rio Grande Ecosystem Management Research Program managed at the Rocky Mountain Research Station's Albuquerque laboratory. This program was initiated in 1994 to address growing pressures to effectively manage the limited resources of the middle Rio Grande Basin. The program is...

  11. Managing the space-time-load continuum in TMDL planning: a case study for understanding groundwaer loads through advanced mapping techniques

    Science.gov (United States)

    Phillip Harte; Marcel Belaval; Andrea Traviglia

    2016-01-01

    The lag time between groundwater recharge and discharge in a watershed and the potential groundwater load to streams is an important factor in forecasting responses to future land use practices. We call this concept managing the “space-time-load continuum.” It’s understood that in any given watershed, the response function (the load at any given time) will differ for...

  12. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  13. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  14. 77 FR 8219 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2012-02-14

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Coastal Zone Management... ICMP constitutes an approvable program and that requirements of the Coastal Zone Management Act (CZMA..., submitted a coastal management program to NOAA for approval under the Coastal Zone Management Act (CZMA), 16...

  15. 76 FR 57022 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2011-09-15

    ... DEPARTMENT OF COMMERCE National Oceanic And Atmospheric Administration Coastal Zone Management Program: Illinois AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Oceanic and...: Illinois has submitted a coastal management program to NOAA for approval under the Coastal Zone Management...

  16. Configuration Management for eXtreme Programming

    DEFF Research Database (Denmark)

    Asklund, U.; Bendix, Lars Gotfred; Ekman, T.

    2003-01-01

    Extreme programming (XP) is a software development method that prescribes the use of 12 different practices. Four of these practices (collective code ownership, continuous integration, small releases and refactoring) can indeed be given good support by the use of simple configuration management (CM......) techniques. We report on our experience in providing many groups of novice developers with CM education, processes and tools to support the four CM-related XP practices in their projects. True to the spirit of XP both education and processes are very lightweight and we found that it was sufficient to focus...

  17. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  18. Evaluation of Approaches for Managing Nitrate Loading from On-Site Wastewater Systems near La Pine, Oregon

    Science.gov (United States)

    Morgan, David S.; Hinkle, Stephen R.; Weick, Rodney J.

    2007-01-01

    .4 square miles) and study-area (247 square miles) scales to test the conceptual model and evaluate processes controlling nitrate concentrations in ground water and potential ground-water discharge of nitrate to streams. Simulation of water-quality conditions for a projected future build-out (base) scenario in which all existing lots are developed using conventional on-site wastewater systems indicates that, at equilibrium, average nitrate concentrations near the water table will exceed 10 mg N/L over areas totaling 9,400 acres. Other scenarios were simulated where future nitrate loading was reduced using advanced treatment on-site systems and a development transfer program. Seven other scenarios were simulated with total nitrate loading reductions ranging from 15 to 94 percent; simulated reductions in the area where average nitrate concentrations near the water table exceed 10 mg N/L range from 22 to 99 percent at equilibrium. Simulations also show that the ground-water system responds slowly to changes in nitrate loading due to low recharge rates and ground-water flow velocity. Consequently, reductions in nitrate loading will not immediately reduce average nitrate concentrations and the average concentration in the aquifer will continue to increase for 25-50 years depending on the level and timing of loading reduction. The capacity of the ground-water system to receive on-site wastewater system effluent, which is related to the density of homes, presence of upgradient residential development, ground-water recharge rate, ground-water flow velocity, and thickness of the oxic part of the aquifer, varies within the study area. Optimization capability was added to the study-area simulation model and the combined simulation-optimization model was used to evaluate alternative approaches to management of nitrate loading from on-site wastewater systems to the shallow alluvial aquifer. The Nitrate Loading Management Model (NLMM) was formulated to find the minimum red

  19. Genetic algorithm for the optimization of the loading pattern for reactor core fuel management

    International Nuclear Information System (INIS)

    Zhou Sheng; Hu Yongming; zheng Wenxiang

    2000-01-01

    The paper discusses the application of a genetic algorithm to the optimization of the loading pattern for in-core fuel management with the NP characteristics. The algorithm develops a matrix model for the fuel assembly loading pattern. The burnable poisons matrix was assigned randomly considering the distributed nature of the poisons. A method based on the traveling salesman problem was used to solve the problem. A integrated code for in-core fuel management was formed by combining this code with a reactor physics code

  20. Effects of an intensive weight loss program on knee joint loading in obese adults with knee osteoarthritis

    DEFF Research Database (Denmark)

    Aaboe, J; Bliddal, H; Messier, S P

    2011-01-01

    To determine the effect of an intensive weight loss program on knee joint loads during walking in obese patients with knee osteoarthritis (OA).......To determine the effect of an intensive weight loss program on knee joint loads during walking in obese patients with knee osteoarthritis (OA)....

  1. AECL's waste management and decommissioning program

    International Nuclear Information System (INIS)

    Kupferschmidt, W.C.H.

    2006-01-01

    Full text: Canada has developed significant expertise in radioactive waste management since the mid 1940s, when the Canadian nuclear program commenced activities at Chalk River Laboratories (CRL). Atomic Energy of Canada Limited (AECL), created as a Federal Crown Corporation in 1952, continues to manage wastes from these early days, as well as other radioactive wastes produced by Canadian hospitals, universities, industry, and operational wastes from AECL's current programs. AECL is also carrying out decommissioning of nuclear facilities and installations in Canada, predominantly at its own sites in Ontario (CRL, and the Douglas Point and Nuclear Power Demonstration prototype reactors), Manitoba (Whiteshell Laboratories) and Quebec (Gentilly-1 prototype reactor). At the CRL site, several major waste management enabling facilities are being developed to facilitate both the near- and long-term management of radioactive wastes. For example, the Liquid Waste Transfer and Storage Project is underway to recover and process highly radioactive liquid wastes, currently stored in underground tanks that, in some cases, date back to the initial operations of the site. This project will stabilize the wastes and place them in modern, monitored storage for subsequent solidification and disposal. Another initiative, the Fuel Packaging and Storage Project, has been initiated to recover and condition degraded used fuel that is currently stored in below-ground standpipes. The fuel will be then be stored in new facilities based on an adaptation of AECL's proven MACSTOR TM * dry storage system, originally designed for intermediate-term above-ground storage of used CANDU fuel bundles. Other commercial-based development work is underway to improve the storage density of the MACSTOR TM design, and to extend its application to interim storage of used LWR fuels as well as to the storage of intermediate-level radioactive waste arising from upcoming reactor refurbishment activities in Canada

  2. Basic elements of a risk management program

    International Nuclear Information System (INIS)

    Ericson, D.M. Jr.; Varnado, G.B.

    1991-01-01

    The modern industrial manger faces the challenge of safely and efficiently operating increasingly complex, sophisticated, and expensive plants in an atmosphere of reduced resources and increased competition, and frequently with heightened political and public oversight. These political and public concerns have become especially significant where the Federal Government regulates and/or funds programs that have a significant potential for adverse public safety or environmental impacts. Under these circumstances, a major accident or environmental insult could translate into major programmatic delay, redirection, or even plant closing. After-the-fact (reactive) resolution of safety and/or environment problems is both costly and time-consuming process. Therefore, it is prudent for managers at all levels to initiate aggressive proactive efforts to identify and control the risks (hazards) associated with their programs. Unfortunately, risk is not a concept with a single, universally accepted definition. It is most often represented as the product of the probability of occurrence of undesired events and the resultant consequences of those events. The consequences of concern may include: loss of human health, reduction in life expectancy, or loss of life; material or financial losses; environmental damage; or even societal disturbances. This paper discusses risk management and systems safety interest in which has intensified over the post decade principally because of public perceptions of the risks associated with nuclear power and the disposal of hazardous chemical wastes

  3. A multi-objective genetic approach to domestic load scheduling in an energy management system

    International Nuclear Information System (INIS)

    Soares, Ana; Antunes, Carlos Henggeler; Oliveira, Carlos; Gomes, Álvaro

    2014-01-01

    In this paper a multi-objective genetic algorithm is used to solve a multi-objective model to optimize the time allocation of domestic loads within a planning period of 36 h, in a smart grid context. The management of controllable domestic loads is aimed at minimizing the electricity bill and the end-user’s dissatisfaction concerning two different aspects: the preferred time slots for load operation and the risk of interruption of the energy supply. The genetic algorithm is similar to the Elitist NSGA-II (Nondominated Sorting Genetic Algorithm II), in which some changes have been introduced to adapt it to the physical characteristics of the load scheduling problem and improve usability of results. The mathematical model explicitly considers economical, technical, quality of service and comfort aspects. Illustrative results are presented and the characteristics of different solutions are analyzed. - Highlights: • A genetic algorithm similar to the NSGA-II is used to solve a multi-objective model. • The optimized time allocation of domestic loads in a smart grid context is achieved. • A variable preference profile for the operation of the managed loads is included. • A safety margin is used to account for the quality of the energy services provided. • A non-dominated front with the solutions in the two-objective space is obtained

  4. Evaluation of demand-side management programs

    International Nuclear Information System (INIS)

    Kolbe, A.L.; O'Loughlin, M.P.

    1990-01-01

    Over the past few years, the attention accorded to demand-side management (DSM) measures has called into question the traditional cost minimization approach for evaluating such programs. Two broad approaches to DSM seem to be generally used: one examining the problem from multiple perspectives and the other including various practical methods used in-house by utility planners. Whatever the standard used to evaluate DSM, there remains at least one problem which cannot be quantified. The customers who participate in a DSM program cannot only take into account the effects of DSM on their electricity bills; their comfort can also be affected. This lowering of comfort constitutes a legitimate cost which can explain why some apparently sensible DSM measures are not adopted. A method is proposed to incorporate this cost. It establishes a way to evaluate DSM program tradeoffs that, from the perspective of standard economic theory, maximizes social welfare; explains why at least one of the perspectives in the multiple perspective approach needs to be modified to incorporate all customer costs; and outlines how the proposed standard can be implemented. 8 refs

  5. Regulatory Aspect of an Ageing Management Program

    International Nuclear Information System (INIS)

    Basic, I.; Zabric, I.; Savli, S.

    2006-01-01

    The aspects of plant ageing management (AM) gained increasing attention over the last ten years. Numerous technical studies have been performed to study the impact of ageing mechanisms on the safe and reliable operation of nuclear power plants. National research activities have been initiated or are in progress to provide the technical basis for decision making processes. The long-term operation of nuclear power plants is influenced by economic considerations, the socio-economic environment including public acceptance, developments in research and the regulatory framework, the availability of technical infrastructure to maintain and service the systems, structures and components as well as qualified personnel. Besides national activities there are a number of international activities in particular under the umbrella of the IAEA, the OECD and the EU. The paper will provide the summary on Nuclear Plant Life Management (PLIM) (or Ageing Management Program (AMP)) and Plant Life Extension (PLEX) development in USA and European countries. Also, insights from such effort currently performing in Slovenia will be discussed.(author)

  6. High-uranium-loaded U3O8-Al fuel element development program [contributed by N.M. Martin, ORNL

    International Nuclear Information System (INIS)

    Martin, M.M.

    1993-01-01

    The High-Uranium-Loaded U 3 O 8 -Al Fuel Element Development Program supports Argonne National Laboratory efforts to develop high-uranium-density research and test reactor fuel to accommodate use of low-uranium enrichment. The goal is to fuel most research and test reactors with uranium of less than 20% enrichment for the purpose of lowering the potential for diversion of highly-enriched material for nonpeaceful usages. The specific objective of the program is to develop the technological and engineering data base for U 3 O 8 -Al plate-type fuel elements of maximal uranium content to the point of vendor qualification for full scale fabrication on a production basis. A program and management plan that details the organization, supporting objectives, schedule, and budget is in place and preparation for fuel and irradiation studies is under way. The current programming envisions a program of about four years duration for an estimated cost of about two million dollars. During the decades of the fifties and sixties, developments at Oak Ridge National Laboratory led to the use of U 3 O 8 -Al plate-type fuel elements in the High Flux Isotope Reactor, Oak Ridge Research Reactor, Puerto Rico Nuclear Center Reactor, and the High Flux Beam Reactor. Most of the developmental information however applies only up to a uranium concentration of about 55 wt % (about 35 vol % U 3 O 8 ). The technical issues that must be addressed to further increase the uranium loading beyond 55 wt % involve plate fabrication phenomena of voids and dogboning, fuel behavior under long irradiation, and potential for the thermite reaction between U 3 O 8 and aluminum. (author)

  7. The influence of modifications of a fatigue loading history program on fatigue lifetime

    Science.gov (United States)

    Branger, J.

    1972-01-01

    Rectangular specimens of 7075 and 2014 aluminum alloys with two holes (stress concentration factor of 3.24) have been tested under axial fatigue loading on a six-rod test bed with modifications of the loading program, the surface particulars, and the frequency. The length of the precrack stage was investigated by use of a new crack detector. In most cases the two alloys behaved similarly, with similar life to crack start under the same loading. Some overloads lengthened the life. Truncation by omission of the lowest peak loads should be limited to about 20 percent of the ultimate load. Simplifying counting methods gave misleading results. Very thin surface layers of anodizing, protection by vinyl, dry nitrogen atmosphere, as well as stepwise reaming or grinding the surface of the holes, lengthened the life; thick anodized layers shortened the life. Compressing the hole surface by rolling had no influence. Frequencies at about 210 to 240 cpm produced shorter lives than those at 40 cpm. At 5.4 cpm the life was considerably longer. A model to better understand the precrack-stage fatigue mechanism is discussed.

  8. Establishment of windows-based load management system for electricity cost savings in competitive electricity markets

    International Nuclear Information System (INIS)

    Chung, K.H.; Kim, B.H.; Hur, D.

    2007-01-01

    For electricity markets to function in a truly competitive and efficient manner, it is not enough to focus solely on improving the efficiencies of power supply. To recognize price-responsive load as a reliability resource, the customer must be provided with price signals and an instrument to respond to these signals, preferably automatically. This paper attempts to develop the Windows-based load management system in competitive electricity markets, allowing the user to monitor the current energy consumption or billing information, to analyze the historical data, and to implement the consumption strategy for cost savings with nine possible scenarios adopted. Finally, this modeling framework will serve as a template containing the basic concepts that any load management system should address. (author)

  9. High-uranium-loaded U3O8--Al fuel element development program

    International Nuclear Information System (INIS)

    Martin, M.M.

    1978-01-01

    The High-Uranium-Loaded U 3 O 8 --Al Fuel Development Program supports Argonne National Laboratory efforts to develop high-uranium-density research and test reactor fuel to accommodate use of low-uranium enrichment. The goal is to fuel most research and test reactors with uranium of less than 20% enrichment for the purpose of lowering the potential for diversion of highly-enriched material for nonpeaceful usages

  10. Effects of utility demand-side management programs on uncertainty

    International Nuclear Information System (INIS)

    Hirst, E.

    1994-01-01

    Electric utilities face a variety of uncertainties that complicate their long-term resource planning. These uncertainties include future economic and load growths, fuel prices, environmental and economic regulations, performance of existing power plants, cost and availability of purchased power, and the costs and performance of new demand and supply resources. As utilities increasingly turn to demand-side management (DSM) programs to provide resources, it becomes more important to analyze the interactions between these programs and the uncertainties facing utilities. This paper uses a dynamic planning model to quantify the uncertainty effects of supply-only vs DSM + supply resource portfolios. The analysis considers four sets of uncertainties: economic growth, fuel prices, the costs to build new power plants, and the costs to operate DSM programs. The two types of portfolios are tested against these four sets of uncertainties for the period 1990 to 2010. Sensitivity, scenario, and worst-case analysis methods are used. The sensitivity analyses show that the DSM + supply resource portfolio is less sensitive to unanticipated changes in economic growth, fuel prices, and power-plant construction costs than is the supply-only portfolio. The supply-only resource mix is better only with respect to uncertainties about the costs of DSM programs. The base-case analysis shows that including DSM programs in the utility's resource portfolio reduces the net present value of revenue requirements (NPV-RR) by 490 million dollars. The scenario-analysis results show an additional 30 million dollars (6%) in benefits associated with reduction in these uncertainties. In the worst-case analysis, the DSM + supply portfolio again reduces the cost penalty associated with guessing wrong for both cases, when the utility plans for high needs and learns it has low needs and vice versa. 20 refs

  11. Energy management for vehicle power net with flexible electric load demand

    NARCIS (Netherlands)

    Kessels, J.T.B.A.; Bosch, van den P.P.J.; Koot, M.W.T.; Jager, de A.G.

    2005-01-01

    The electric power demand in road vehicles increases rapidly and to supply all electric loads efficiently, energy management (EM) turns out to be a necessity. In general, EM exploits the storage capacity of a buffer connected to the vehicle's power net, such that energy is stored or retrieved at

  12. Energy consumption program: A computer model simulating energy loads in buildings

    Science.gov (United States)

    Stoller, F. W.; Lansing, F. L.; Chai, V. W.; Higgins, S.

    1978-01-01

    The JPL energy consumption computer program developed as a useful tool in the on-going building modification studies in the DSN energy conservation project is described. The program simulates building heating and cooling loads and computes thermal and electric energy consumption and cost. The accuracy of computations are not sacrificed, however, since the results lie within + or - 10 percent margin compared to those read from energy meters. The program is carefully structured to reduce both user's time and running cost by asking minimum information from the user and reducing many internal time-consuming computational loops. Many unique features were added to handle two-level electronics control rooms not found in any other program.

  13. Enrollment of SME Managers to Growth-oriented Training Programs

    DEFF Research Database (Denmark)

    Bager, Torben; Jensen, Kent Wickstrøm; Schou Nielsen, Pia

    2015-01-01

    Purpose: Entrepreneurial learning through formal growth-oriented training programs for SME managers promises to enhance the growth competences and growth intentions of the enrolled managers. The impact of such programs, however, depends on who enrolls since initial competence and growth-intention......Purpose: Entrepreneurial learning through formal growth-oriented training programs for SME managers promises to enhance the growth competences and growth intentions of the enrolled managers. The impact of such programs, however, depends on who enrolls since initial competence and growth...... has from 2012 to 2015 trained about 700 SME managers. Data are currently available for 366 of these participants. This evidence is compared with survey results from a randomly selected control group of 292 growth oriented SME managers in the same firm-size group. The data were analyzed through...... of the program. Originality/value The paper is the first systematic study of the importance of who enrolls in training programs for SME managers....

  14. Development and Implementation of a Program Management Maturity Model

    Energy Technology Data Exchange (ETDEWEB)

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  15. Nuclear Waste Management Program summary document, FY 1981

    International Nuclear Information System (INIS)

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel

  16. Nuclear Waste Management Program summary document, FY 1981

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, Sheldon

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel.

  17. SELF MANAGEMENT PROGRAM MENINGKATKAN KOPING, NIAT DAN KEPATUHAN BEROBAT PASIEN PJK SETELAH PEMBERIAN SELF MANAGEMENT PROGRAM

    Directory of Open Access Journals (Sweden)

    Hanim mufarokhah mufarokhah

    2016-04-01

    Full Text Available Introduction: Management coronary artery disease required lifelong treatment. The successful management of CHD requires efective coping, intention and medication adherence of CHD’s patients. This study aimed to explain the changes of coping, intention, and medication adherence in patients with CHD after giving self management programme in RSUD Jombang based on Theory Planned Behavior.Method: This study used a quasy experimental pretest-posttest control group design and 28 respondens selected by consecutive sampling. Independent variable was self management programme while dependent variables were coping, intention, medication adherence. Data were collected by using questonnaires measuring coping level, intention and medication adherence. The statistical test used was Mann Whitney, Wilcoxone Signed Rank and t-Test. Result: The result showed that 1 self management programme improve the level of coping in patients with CHD (p < 0,001, 2 self management programme improve the level of intention in patients with CHD (p < 0,001, 3 self management programme improve the level of medication adherence in patients with CHD (p < 0,001. Discussion: To change a behavior requires improvement of coping and intentions. This is in according to the Theory of Planned Behavior that behavior change is influenced by the attitude toward the behavior, subjective norm, perceived behavioral control and intention. Keywords: self management program, coping, intention, medication adherence, coronary heart disease

  18. Sandia National Laboratories, California Environmental Management System program manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  19. 76 FR 47296 - Transit Asset Management (TAM) Pilot Program Funds

    Science.gov (United States)

    2011-08-04

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Transit Asset Management (TAM) Pilot... supplemented by Bus Discretionary funds in support of the Transit Asset Management (TAM) Pilot Program, which was announced in the TAM Program Notice of Funding Availability on November 19, 2010. The TAM program...

  20. SNL/CA Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-09-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program was developed in accordance with Department of Energy (DOE) Order 450.1 and incorporates the elements of the International Standard on Environmental Management Systems, ISO 14001.

  1. Sandia National Laboratories, California Environmental Management System program manual

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  2. Competencies for Graduate Culinary Management Degree Programs: Stakeholders' Perspectives

    Science.gov (United States)

    George, Annette A.

    2009-01-01

    Available literature on graduate hospitality education was highly focused on required competencies for hospitality management degree programs but not on culinary management. One possible explanation is that the culinary sector still lags behind in the formation of graduate culinary management programs in the United States. This causal comparative…

  3. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  4. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-10-21

    ... participation in the Multistate Corridor Operations and Management (MCOM) Program authorized by the Safe... transportation system management and operations. This notice seeks applications for available fiscal year (FY... system management and operations. Since the MCOM program is funded by the DOT Intelligent Transportation...

  5. 78 FR 43962 - Meeting: RTCA Program Management Committee

    Science.gov (United States)

    2013-07-22

    ... Washington, DC, on June 28, 2013. Paige Williams, Management Analyst, NextGen, Business Operations Group... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Meeting: RTCA Program Management...: Notice of RTCA Program Management Committee Meeting. SUMMARY: The FAA is issuing this notice to advise...

  6. 18 CFR 357.5 - Cash management programs.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management...: CARRIERS SUBJECT TO PART I OF THE INTERSTATE COMMERCE ACT § 357.5 Cash management programs. Oil pipeline... and § 357.2 of this title that participate in cash management programs must file these agreements with...

  7. 18 CFR 260.400 - Cash management programs.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management... Cash management programs. Natural gas companies subject to the provisions of the Commission's Uniform... management programs must file these agreements with the Commission. The documentation establishing the cash...

  8. 18 CFR 141.500 - Cash management programs.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management... OF 1978 STATEMENTS AND REPORTS (SCHEDULES) § 141.500 Cash management programs. Public utilities and... and § 141.1 or § 141.2 of this title that participate in cash management programs must file these...

  9. Load Balancing Integrated Least Slack Time-Based Appliance Scheduling for Smart Home Energy Management

    Science.gov (United States)

    Silva, Bhagya Nathali; Khan, Murad; Han, Kijun

    2018-01-01

    The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption. Hence, we propose a smart home energy management system that reduces unnecessary energy consumption by integrating an automated switching off system with load balancing and appliance scheduling algorithm. The load balancing scheme acts according to defined constraints such that the cumulative energy consumption of the household is managed below the defined maximum threshold. The scheduling of appliances adheres to the least slack time (LST) algorithm while considering user comfort during scheduling. The performance of the proposed scheme has been evaluated against an existing energy management scheme through computer simulation. The simulation results have revealed a significant improvement gained through the proposed LST-based energy management scheme in terms of cost of energy, along with reduced domestic energy consumption facilitated by an automated switching off mechanism. PMID:29495346

  10. Load Balancing Integrated Least Slack Time-Based Appliance Scheduling for Smart Home Energy Management

    Directory of Open Access Journals (Sweden)

    Bhagya Nathali Silva

    2018-02-01

    Full Text Available The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption. Hence, we propose a smart home energy management system that reduces unnecessary energy consumption by integrating an automated switching off system with load balancing and appliance scheduling algorithm. The load balancing scheme acts according to defined constraints such that the cumulative energy consumption of the household is managed below the defined maximum threshold. The scheduling of appliances adheres to the least slack time (LST algorithm while considering user comfort during scheduling. The performance of the proposed scheme has been evaluated against an existing energy management scheme through computer simulation. The simulation results have revealed a significant improvement gained through the proposed LST-based energy management scheme in terms of cost of energy, along with reduced domestic energy consumption facilitated by an automated switching off mechanism.

  11. Load Balancing Integrated Least Slack Time-Based Appliance Scheduling for Smart Home Energy Management.

    Science.gov (United States)

    Silva, Bhagya Nathali; Khan, Murad; Han, Kijun

    2018-02-25

    The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption. Hence, we propose a smart home energy management system that reduces unnecessary energy consumption by integrating an automated switching off system with load balancing and appliance scheduling algorithm. The load balancing scheme acts according to defined constraints such that the cumulative energy consumption of the household is managed below the defined maximum threshold. The scheduling of appliances adheres to the least slack time (LST) algorithm while considering user comfort during scheduling. The performance of the proposed scheme has been evaluated against an existing energy management scheme through computer simulation. The simulation results have revealed a significant improvement gained through the proposed LST-based energy management scheme in terms of cost of energy, along with reduced domestic energy consumption facilitated by an automated switching off mechanism.

  12. Managing PBL difficulties in an industrial engineering and management program

    Directory of Open Access Journals (Sweden)

    Anabela Alves

    2016-08-01

    Full Text Available Purpose: Project-Based Learning (PBL is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM, at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning

  13. Managing PBL difficulties in an industrial engineering and management program

    International Nuclear Information System (INIS)

    Alves, A.; Sousa, R.; Moreira, F.; Carvalho, M.A.; Cardoso, E.; Pimenta, P.; Malheiro, T.; Brito, I.; Fernandes, S.; Mesquita, D.

    2016-01-01

    Project-Based Learning (PBL) is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM), at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning approaches. (Author)

  14. Managing PBL difficulties in an industrial engineering and management program

    Energy Technology Data Exchange (ETDEWEB)

    Alves, A.; Sousa, R.; Moreira, F.; Carvalho, M.A.; Cardoso, E.; Pimenta, P.; Malheiro, T.; Brito, I.; Fernandes, S.; Mesquita, D.

    2016-07-01

    Project-Based Learning (PBL) is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM), at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning approaches. (Author)

  15. A quality management program in intravascular brachytherapy

    International Nuclear Information System (INIS)

    Chakri, Abderrahim; Thomadsen, Bruce

    2002-01-01

    While simple, intravascular brachytherapy (IVB) presents a considerable potential for harm to the patient. The medical physicist maintains the responsibility to minimize the likelihood of operational problems or dosimetric errors. The principals for safe operation remain the same as with any radiotherapy treatment: to deliver the correct dose, to the correct location, safety. To develop an effective and comprehensive quality management (QM) program for IVB, a physicist should utilize proven risk assessment techniques rather than simply thinking of things to check, and follow guidances such as ISO9001:2000. The proposed QM program includes the following: Procedures designed to assure the safety of the patient: Identification of the patient; tests of the integrity and patency for the delivery catheter, operation of the source train, and patency of the catheter in the treatment position; a check for recovery preparations; and verification of source recovery. Procedures to assure positional accuracy of the treatment: Verification of the positioning the catheter in the artery and of the sources in the catheter. Procedures to assure dosimetry accuracy: Acceptance testing of the device, including verification of the source strength and uniformity, and of the treatment duration tables; verification of the treatment prescription and duration for each patient; and control measures that minimize the likelihood of errors removing the source at the correct time

  16. Public participation in UMTRA Project Program Management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    The U.S. Department of Energy (DOE) is cleaning up radioactive soil and ore residue from 24 inactive uranium processing sites under the Uranium Mill Tailings Remedial Action (UMTRA) Project. In early 1993, the DOE adopted new guidelines strongly encouraging public participation. This guidance commits to providing the public with opportunities to participate in the decision-making process for program planning, design, and implementation. Rooted in the conviction that an effective public participation program will enable citizens to take part in policy decisions, the full adoption of the guidance by the UMTRA project can also help DOE make better decisions, provide a means to build consensus, and assist in building credibility. This transition to open communication parallels the climate of corporate America in which increases in productivity are often the result of workers and management teaming together to solve problems. While these guidelines have been embraced by public affairs staff from headquarters to the field offices, barriers still exist that inhibit substantive public involvement. The challenge for the UMTRA project is to overcome these barriers to ensure that public participation is an integral part of the way business is conducted. This paper discusses lessons learned by the UMTRA project in its efforts to address barriers to public participation and the project's plans for full compliance with the DOE guidelines

  17. Thinned pipe management program of Korean NPPs

    International Nuclear Information System (INIS)

    Lee, S.H.; Kim, T.R.; Jeon, S.C.; Hwang, K.M.

    2003-01-01

    Wall thinning of carbon steel pipe components due to Flow-Accelerated Corrosion (FAC) is one of the most serious threats to the integrity of steam cycle systems in Nuclear Power Plants (NPP). If the thickness of a pipe component is reduced below the critical level, it cannot sustain stress and consequently results in leakage or rupture. In order to minimize the possibility of excessive wall thinning, Thinned Pipe Management Program (TPMP) has been set up and being implemented to all Korean NPPs. Important elements of the TPMP include the prediction of the FAC rate for each component based on model analysis, prioritization of pipe components for inspection, thickness measurement, calculation of wear and wear rate for each component. Additionally, decision making associated with replacement or continuous service for thinned pipe components and establishment of long-term strategic management plan based on diagnosis of plant condition regarding overall wall thinning also are essential part of the TPMP. From pre-service inspection data, it has been found that initial thickness is varies, which influences wear and wear rate calculations. (author)

  18. Load management as a smart grid concept for sizing and designing of hybrid renewable energy systems

    Science.gov (United States)

    Eltamaly, Ali M.; Mohamed, Mohamed A.; Al-Saud, M. S.; Alolah, Abdulrahman I.

    2017-10-01

    Optimal sizing of hybrid renewable energy systems (HRES) to satisfy load requirements with the highest reliability and lowest cost is a crucial step in building HRESs to supply electricity to remote areas. Applying smart grid concepts such as load management can reduce the size of HRES components and reduce the cost of generated energy considerably. In this article, sizing of HRES is carried out by dividing the load into high- and low-priority parts. The proposed system is formed by a photovoltaic array, wind turbines, batteries, fuel cells and a diesel generator as a back-up energy source. A smart particle swarm optimization (PSO) algorithm using MATLAB is introduced to determine the optimal size of the HRES. The simulation was carried out with and without division of the load to compare these concepts. HOMER software was also used to simulate the proposed system without dividing the loads to verify the results obtained from the proposed PSO algorithm. The results show that the percentage of division of the load is inversely proportional to the cost of the generated energy.

  19. Estimating the Impacts of Direct Load Control Programs Using GridPIQ, a Web-Based Screening Tool

    Energy Technology Data Exchange (ETDEWEB)

    Pal, Seemita; Thayer, Brandon L.; Barrett, Emily L.; Studarus, Karen E.

    2017-11-13

    In direct load control (DLC) programs, utilities can curtail the demand of participating loads to contractually agreed-upon levels during periods of critical peak load, thereby reducing stress on the system, generation cost, and required transmission and generation capacity. Participating customers receive financial incentives. The impacts of implementing DLC programs extend well beyond peak shaving. There may be a shift of load proportional to the interrupted load to the times before or after a DLC event, and different load shifts have different consequences. Tools that can quantify the impacts of such programs on load curves, peak demand, emissions, and fossil fuel costs are currently lacking. The Grid Project Impact Quantification (GridPIQ) screening tool includes a Direct Load Control module, which takes into account project-specific inputs as well as the larger system context in order to quantify the impacts of a given DLC program. This allows users (utilities, researchers, etc.) to test and compare different program specifications and their impacts.

  20. What is the role of a project or program manager in implementing and maintaining a quality assurance program

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The task of managing a government-funded program has changed significantly from the days when a program manager managed the funds and depended on reports from a contractor to measure the program's progress. Today's manager of waste management program must be personally involved in every aspect of the program. The successful manager of a waste management program will lead the development of management controls to ensure successful accomplishment of project objectives. This paper describes the responsibilities of the project manager, the quality assurance staff and how they interface to develop and implement a quality assurance program for a waste management program

  1. Load control services in the management of power system security costs

    International Nuclear Information System (INIS)

    Jayantilal, A.; Strbac, G.

    1999-01-01

    The new climate of deregulation in the electricity industry is creating a need for a more transparent cost structure and within this framework the cost of system security has been a subject of considerable interest. Traditionally power system security has been supplied by out-of-merit generation, in the short term, and transmission reinforcement, in the long term. This paper presents a method of analysing the role of load-demand in the management of power system security costs by utilising load control services (LCS). It also proposes a competitive market to enable bidding from various participants within the electricity industry to supply system security. (author)

  2. Active load management in an intelligent building using model predictive control strategy

    DEFF Research Database (Denmark)

    Zong, Yi; Kullmann, Daniel; Thavlov, Anders

    2011-01-01

    This paper introduces PowerFlexHouse, a research facility for exploring the technical potential of active load management in a distributed power system (SYSLAB) with a high penetration of renewable energy and presents in detail on how to implement a thermal model predictive controller for load...... shifting in PowerFlexHouse heaters' power consumption scheme. With this demand side control study, it is expected that this method of demand response can dramatically raise energy efficiencies and improve grid reliability, when there is a high penetration of intermittent energy resources in the power...

  3. Programming Algorithms of load balancing with HA-Proxy in HTTP services

    Directory of Open Access Journals (Sweden)

    José Teodoro Mejía Viteri

    2018-02-01

    Full Text Available The access to the public and private services through the web gains daily protagonism, and sometimes they must support amounts of requests that a team can not process, so there are solutions that use algorithms that allow to distribute the load of requests of a web application in several equipment; the objective of this work is to perform an analysis of load balancing scheduling algorithms through the HA-Proxy tool, and deliver an instrument that identifies the load distribution algorithm to be used and the technological infrastructure, to largely cover implementation. The information used for this work is based on a bibliographic analysis, eld study and implementation of the different load balancing algorithms in equipment, where the distribution and its performance will be analyzed. The incorporation of this technology to the management of services on the web, improves availability, helps business continuity and through the different forms of distribution of the requests of the algorithms that can be implemented in HA-Proxy to provide those responsible for information technology systems with a view of their advantages and disadvantages.

  4. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  5. Mindstorms robots and the application of cognitive load theory in introductory programming

    Science.gov (United States)

    Mason, Raina; Cooper, Graham

    2013-12-01

    This paper reports on a series of introductory programming workshops, initially targeting female high school students, which utilised Lego Mindstorms robots. Cognitive load theory (CLT) was applied to the instructional design of the workshops, and a controlled experiment was also conducted investigating aspects of the interface. Results indicated that a truncated interface led to better learning by novice programmers as measured by test performance by participants, as well as enhanced shifts in self-efficacy and lowered perception of difficulty. There was also a transfer effect to another programming environment (Alice). It is argued that the results indicate that for novice programmers, the mere presence on-screen of additional (redundant) entities acts as a form of tacit distraction, thus impeding learning. The utility of CLT to analyse, design and deliver aspects of computer programming environments and instructional materials is discussed.

  6. Capital Construction Fund Program :: Office of Management and Budget

    Science.gov (United States)

    Leaders Budget Policy Work for NOAA Fisheries Contact Us Programs Sustainable Fisheries Protected Regional Fishery Management Councils Congress Activities Budget Testimony Educators and Students Education Budget Home Appeals Division Budget FOIA Financial Services Saltonstall-Kennedy Grant Program Fisheries

  7. Evaluating forest management policies by parametric linear programing

    Science.gov (United States)

    Daniel I. Navon; Richard J. McConnen

    1967-01-01

    An analytical and simulation technique, parametric linear programing explores alternative conditions and devises an optimal management plan for each condition. Its application in solving policy-decision problems in the management of forest lands is illustrated in an example.

  8. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    National Research Council Canada - National Science Library

    Gray, John

    1997-01-01

    .... To comply with this Executive Order, Navy contracting offices require an effective methodology for developing an instrument to measure the satisfaction of their customers, Navy Program Managers...

  9. Learning to Manage: A Program Just for Directors.

    Science.gov (United States)

    Thomas, Megan E.

    1996-01-01

    Describes the Head Start-Johnson & Johnson Management Fellows program, whose mission is strengthening management skills of Head Start directors by providing training in human resources management, organizational design and development, financial management, computers and information systems, operations, marketing, and development of strategic…

  10. SNL/CA Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004. Elements of the ISO standard overlap with those of Department of Energy (DOE) Order 450.1, thus SNL/CA's EMS program also meets the DOE requirements.

  11. The MANAGE database: nutrient load and site characteristic updates and runoff concentration data.

    Science.gov (United States)

    Harmel, Daren; Qian, Song; Reckhow, Ken; Casebolt, Pamela

    2008-01-01

    The "Measured Annual Nutrient loads from AGricultural Environments" (MANAGE) database was developed to be a readily accessible, easily queried database of site characteristic and field-scale nutrient export data. The original version of MANAGE, which drew heavily from an early 1980s compilation of nutrient export data, created an electronic database with nutrient load data and corresponding site characteristics from 40 studies on agricultural (cultivated and pasture/range) land uses. In the current update, N and P load data from 15 additional studies of agricultural runoff were included along with N and P concentration data for all 55 studies. The database now contains 1677 watershed years of data for various agricultural land uses (703 for pasture/rangeland; 333 for corn; 291 for various crop rotations; 177 for wheat/oats; and 4-33 yr for barley, citrus, vegetables, sorghum, soybeans, cotton, fallow, and peanuts). Across all land uses, annual runoff loads averaged 14.2 kg ha(-1) for total N and 2.2 kg ha(-1) for total P. On average, these losses represented 10 to 25% of applied fertilizer N and 4 to 9% of applied fertilizer P. Although such statistics produce interesting generalities across a wide range of land use, management, and climatic conditions, regional crop-specific analyses should be conducted to guide regulatory and programmatic decisions. With this update, MANAGE contains data from a vast majority of published peer-reviewed N and P export studies on homogeneous agricultural land uses in the USA under natural rainfall-runoff conditions and thus provides necessary data for modeling and decision-making related to agricultural runoff. The current version can be downloaded at http://www.ars.usda.gov/spa/manage-nutrient.

  12. Child Protection Program Implementations in Sport Management

    Directory of Open Access Journals (Sweden)

    Özgün PARASIZ

    2015-07-01

    Full Text Available The protection and provision of the welfare of children who are in a vulnerable condition to all kinds of risk in the modern world in every field they actively take part in is acknowledged as one of the most important social responsibilites of states in this day and age. In the fight against this problem, especially developed countries promote chi ld protection policies and implement them in every sport field children take active part in. The aim of this study is to examine in which dimensions child protection system, defined as the provision of the child’s safety in all aspects including physical, social, emotional, economic, cultural, ethnic, moral, religious and political on a legal basis and in practice, is implemented within the sport systems of England and to identify the policies of sports organizations. In the study, scanning method based o n the literature was used. Research data was obtained by examining the related sources on the subject in various international libraries, journals, books and sports organizations. According to the information obtained in the study, child protection progra ms were identified to be a legal obligation for independent sports organizations responsible for the management of the sport (such as Federations, Olympic committees, sport clubs. The fundamental purpose of child protection programs is to diminish the ris k of all kinds of (sexual, physical and emotional child abuse. Sports organization establish child protection systems within their governing structure and work in coordination with the related units of clubs, federations and central administrations. Moreo ver, by providing special trainings to administrators and coaches, the stipulation of obtaining a special document for coaches who shall work with sportsmen under the age of 18 has been laid down. Special regulations and educational programs for sport fede rations have been prepared intended for the functioning of child protection system in

  13. Disease management programs: barriers and benefits.

    Science.gov (United States)

    Magnezi, Racheli; Kaufman, Galit; Ziv, Arnona; Kalter-Leibovici, Ofra; Reuveni, Haim

    2013-04-01

    The healthcare system in Israel faces difficulties similar to those of most industrialized countries, including limited resources, a growing chronically ill population, and demand for high quality care. Disease management programs (DMPs) for patients with a chronic illness aim to alleviate some of these problems, primarily by improving patient self-management skills and quality of care. This study surveyed the opinions of senior healthcare administrators regarding barriers, benefits, and support for implementing DMPs. Cross-sectional survey. A 21-item questionnaire was self-completed by 87 of 105 (83%) healthcare administrators included in the study. Participants were 65.5% male and 47% physicians, 25.3% nurses, 17.3% administrators, and 10.3% other healthcare professionals. The main perceived benefit of DMPs among all respondents was improving quality of care. Other benefits noted were better contact with patients (81.6%) and better compliance with treatment (75.9%). Efficient long-term utilization of system resources was perceived as a benefit by only 58.6%. The main perceived barriers to implementing DMPs were lack of budgetary resources (69%) and increased time required versus financial compensation received (63.2%). The benefits of DMPs were patient oriented; barriers were perceived as financial and limiting professional autonomy. Information regarding long-term benefits (better patient outcomes) that ultimately provide better value for the system versus short-term barriers (increased costs and expenditures of time without compensation) might encourage the implementation of DMPs in countries faced with a growing population of patients with at least 1 chronic illness.

  14. Monitoring Training Loads in Professional Basketball Players Engaged in a Periodized Training Program.

    Science.gov (United States)

    Aoki, Marcelo S; Ronda, Lorena T; Marcelino, Pablo R; Drago, Gustavo; Carling, Chris; Bradley, Paul S; Moreira, Alexandre

    2017-02-01

    Aoki, MS, Ronda, LT, Marcelino, PR, Drago, G, Carling, C, Bradley, PS, and Moreira, A. Monitoring training loads in professional basketball players engaged in a periodized training program. J Strength Cond Res 31(2): 348-358, 2017-The aim of this study was to investigate the dynamics of external training load (eTL) and internal training load (iTL) during seasonal periods, and examine the effect of a periodized training program on physical performance in professional basketball players. Repeated measures for 9 players (28 ± 6 years; 199 ± 8 cm; 101 ± 12 kg) were collected from 45 training sessions, over a 6-week preseason phase and a 5-week in-season phase. Physical tests were conducted at baseline (T1), week 4 (T2), and week 9 (T3). Differences in means are presented as % ± confident limits. A very likely difference was observed during in-season compared with preseason for the eTL variables (measured by multivariable monitoring device), mechanical load (13.5 ± 8.8) and peak acceleration (11.0 ± 11.2), respectively. Regarding iTL responses, a very large decrement in TRIMP (most likely difference, -20.6 ± 3.8) and in session rating of perceived exertion training load (very likely difference, -14.2 ± 9.0) was detected from preseason to in-season. Physical performance improved from T1 to T3 for Yo-Yo intermittent recovery test 1 (62.2 ± 34.3, effect size [ES] > 1.2); countermovement jump (8.8 ± 6.1, ES > 0.6); and squat jump (14.8 ± 10.2, ES > 0.8). Heart rate (HR; %HRpeak) exercise responses during a submaximal running test decreased from T1 to T3 (3.2 ± 4.3, ES 1.2). These results provide valuable information to coaches about training loads and physical performance across different seasonal periods. The data demonstrate that both eTL and iTL measures should be monitored in association with physical tests, to provide a comprehensive understanding of the training process.

  15. Managing player load in professional rugby union: a review of current knowledge and practices.

    Science.gov (United States)

    Quarrie, Kenneth L; Raftery, Martin; Blackie, Josh; Cook, Christian J; Fuller, Colin W; Gabbett, Tim J; Gray, Andrew J; Gill, Nicholas; Hennessy, Liam; Kemp, Simon; Lambert, Mike; Nichol, Rob; Mellalieu, Stephen D; Piscione, Julien; Stadelmann, Jörg; Tucker, Ross

    2017-03-01

    The loads to which professional rugby players are subjected has been identified as a concern by coaches, players and administrators. In November 2014, World Rugby commissioned an expert group to identify the physical demands and non-physical load issues associated with participation in professional rugby. To describe the current state of knowledge about the loads encountered by professional rugby players and the implications for their physical and mental health. The group defined 'load' as it relates to professional rugby players as the total stressors and demands applied to the players. In the 2013-2014 seasons, 40% of professional players appeared in 20 matches or more, and 5% of players appeared in 30 matches or more. Matches account for ∼5-11% of exposure to rugby-related activities (matches, team and individual training sessions) during professional competitions. The match injury rate is about 27 times higher than that in training. The working group surmised that players entering a new level of play, players with unresolved previous injuries, players who are relatively older and players who are subjected to rapid increases in load are probably at increased risk of injury. A mix of 'objective' and 'subjective' measures in conjunction with effective communication among team staff and between staff and players was held to be the best approach to monitoring and managing player loads. While comprehensive monitoring holds promise for individually addressing player loads, it brings with it ethical and legal responsibilities that rugby organisations need to address to ensure that players' personal information is adequately protected. Administrators, broadcasters, team owners, team staff and the players themselves have important roles in balancing the desire to have the 'best players' on the field with the ongoing health of players. In contrast, the coaching, fitness and medical staff exert significant control over the activities, duration and intensity of training

  16. Argos: Residential end-use simulation model for load management strategy analysis

    International Nuclear Information System (INIS)

    Capasso, A.; Lamedica, R.; Prudenzi, A.

    1992-01-01

    In recent years, load management (LM) strategies, aimed at the optimization of available energy resources, as well as, the reduction of investments for new power plants, have been applied worldwide in residential end-use assessments. However, the forecasting of LM strategy impacts on the residential sector is very complex because it is based on a preliminary evaluation of the customers' proclivity to adapt their load characteristics to utility aims. In order to reduce load analysis requirements, which are substantial due to the need for thorough statistical analyses, complex field tests and measurements, the availability of models taking into account customer behavioural aspects is of paramount importance. This paper illustrates a simulation model which allows the performance of numerical evaluations concerning the effectiveness of some LM strategies applied to a residential end-use area load profile as previously determined by the aggregation of the contributions of individual households. This model enabled the evaluation of the impact, on the load profile, of a time-of-day tariff such as that recently introduced in Italy

  17. Environmental Assessment : Squawfish Management Program : Final.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  18. Quantifying suspended sediment loads delivered to Cheney Reservoir, Kansas: Temporal patterns and management implications

    Science.gov (United States)

    Stone, Mandy L.; Juracek, Kyle E.; Graham, Jennifer L.; Foster, Guy

    2015-01-01

    average, within ±20% of estimates based on streamflow and turbidity combined. Results demonstrate that large suspended sediment loads are delivered to Cheney Reservoir in very short time periods, indicating that sediment management plans eventually must address large, infrequent inflow events to be effective.

  19. Generalized Analytical Program of Thyristor Phase Control Circuit with Series and Parallel Resonance Load

    OpenAIRE

    Nakanishi, Sen-ichiro; Ishida, Hideaki; Himei, Toyoji

    1981-01-01

    The systematic analytical method is reqUired for the ac phase control circuit by means of an inverse parallel thyristor pair which has a series and parallel L-C resonant load, because the phase control action causes abnormal and interesting phenomena, such as an extreme increase of voltage and current, an unique increase and decrease of contained higher harmonics, and a wide variation of power factor, etc. In this paper, the program for the analysis of the thyristor phase control circuit with...

  20. Disease management programs for CKD patients: the potential and pitfalls.

    Science.gov (United States)

    Rocco, Michael V

    2009-03-01

    Disease management describes the use of a number of approaches to identify and treat patients with chronic health conditions, especially those that are expensive to treat. Disease management programs have grown rapidly in the United States in the past several years. These programs have been established for patients with chronic kidney disease (CKD), but some have been discontinued because of the high cost of the program. Disease management programs for CKD face unique challenges. Identification of patients with CKD is hampered by incomplete use of the International Classification of Diseases, Ninth Revision (ICD-9) codes for CKD by physicians and the less than universal use of estimated glomerular filtration rate from serum creatinine measurements to identify patients with an estimated glomerular filtration rate less than 60 mL/min/1.73 m(2). CKD affects multiple organ systems. Thus, a comprehensive disease management program will need to manage each of these aspects of CKD. These multiple interventions likely will make a CKD disease management program more costly than similar disease management programs designed for patients with diabetes mellitus, congestive heart failure, or other chronic diseases. The lack of data that can be used to develop effective disease management programs in CKD makes it difficult to determine goals for the management of each organ system affected by CKD. Finally, long periods of observation will be needed to determine whether a particular disease management program is effective in not only improving patient outcomes, but also decreasing both resource use and health care dollars. This long-term observation period is contrary to how most disease management contracts are written, which usually are based on meeting goals during a 1- to 3-year period. Until these challenges are resolved, it likely will be difficult to maintain effective disease management programs for CKD.

  1. Federal Energy Efficiency through Utility Partnerships: Federal Energy Management Program (FEMP) Program Overview Fact Sheet

    International Nuclear Information System (INIS)

    Beattie, D.; Wolfson, M.

    2001-01-01

    This Utility Program Overview describes how the Federal Energy Management Program (FEMP) utility program assists Federal energy managers. The document identifies both a utility financing mechanism and FEMP technical assistance available to support agencies' implementation of energy and water efficiency methods and renewable energy projects

  2. Management mechanisms for development of personnel professional competencies at a loading and haulage company

    Science.gov (United States)

    Shishkina, S. V.; Pristupa, Yu D.; Pavlova, L. D.; Fryanov, V. N.

    2018-05-01

    The necessity for development a management mechanism for development of personnel professional competencies at a loading and haulage company in order to ensuring the compliance of competencies with labor functions, regulated by the current professional standards, is substantiated. A functional diagram of the organizational and technical system of the loading and haulage company was developed, that includes the interaction mechanism between the personnel and the objects of the main production. The problem of algorithm development to assess the correspondence of communicative competencies and labor functions of loading and haulage companies, ensuring the achievement of the management goal with a minimum risk of an emergency situation or an accident, was set and solved. The idea of management problem solving consists in the operational development and implementation of anticipatory measures at each deviation in personnel actions from normative or target indicators. The dependence of the risk of imbalance of communicative competences and labor functions in a given period of time is established. The effectiveness of the developed and implemented mechanism is confirmed by the positive dynamics of the test results.

  3. Total maximum allocated load calculation of nitrogen pollutants by linking a 3D biogeochemical-hydrodynamic model with a programming model in Bohai Sea

    Science.gov (United States)

    Dai, Aiquan; Li, Keqiang; Ding, Dongsheng; Li, Yan; Liang, Shengkang; Li, Yanbin; Su, Ying; Wang, Xiulin

    2015-12-01

    The equal percent removal (EPR) method, in which pollutant reduction ratio was set as the same in all administrative regions, failed to satisfy the requirement for water quality improvement in the Bohai Sea. Such requirement was imposed by the developed Coastal Pollution Total Load Control Management. The total maximum allocated load (TMAL) of nitrogen pollutants in the sea-sink source regions (SSRs) around the Bohai Rim, which is the maximum pollutant load of every outlet under the limitation of water quality criteria, was estimated by optimization-simulation method (OSM) combined with loop approximation calculation. In OSM, water quality is simulated using a water quality model and pollutant load is calculated with a programming model. The effect of changes in pollutant loads on TMAL was discussed. Results showed that the TMAL of nitrogen pollutants in 34 SSRs was 1.49×105 ton/year. The highest TMAL was observed in summer, whereas the lowest in winter. TMAL was also higher in the Bohai Strait and central Bohai Sea and lower in the inner area of the Liaodong Bay, Bohai Bay and Laizhou Bay. In loop approximation calculation, the TMAL obtained was considered satisfactory for water quality criteria as fluctuation of concentration response matrix with pollutant loads was eliminated. Results of numerical experiment further showed that water quality improved faster and were more evident under TMAL input than that when using the EPR method

  4. Export Management Specialist. A Training Program. Instructor's Edition.

    Science.gov (United States)

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This publication provides instructors with materials for an export management specialist (EMS) training program. The objective of the training program is to assist companies in reaching their export goals by educating current and potential managers about the basics of exporting. It provides a foundation for considering international trade and for…

  5. NASA and FAA Programs in Air Traffic Management

    Science.gov (United States)

    Condon, Gregory W.

    1995-01-01

    This presentation will present an overview of NASA and joint NASA/FAA R&D programs related to Air Traffic Management. In addition it will address the plans for the new Advanced Air Transportation Technologies program, which will investigate methods for achieving the airline industries needs for increased flexibility in the nation's air traffic management system.

  6. 76 FR 72029 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-11-21

    ... in the FHWA Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511... Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511. This notice clarifies... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Multistate Corridor Operations and...

  7. Sandia National Laboratories, California Chemical Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2012-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

  8. Computer program for buckling loads of orthotropic laminated stiffened panels subjected to biaxial in-place loads (BUCLASP 2)

    Science.gov (United States)

    Viswanathan, A. V.; Tamekuni, M.

    1974-01-01

    General-purpose program performs exact instability analyses for structures such as unidirectionally-stiffened, rectangular composite panels. Program was written in FORTRAN IV and COMPASS for CDC-series computers.

  9. Thermal models of buildings. Determination of temperatures, heating and cooling loads. Theories, models and computer programs

    Energy Technology Data Exchange (ETDEWEB)

    Kaellblad, K

    1998-05-01

    The need to estimate indoor temperatures, heating or cooling load and energy requirements for buildings arises in many stages of a buildings life cycle, e.g. at the early layout stage, during the design of a building and for energy retrofitting planning. Other purposes are to meet the authorities requirements given in building codes. All these situations require good calculation methods. The main purpose of this report is to present the authors work with problems related to thermal models and calculation methods for determination of temperatures and heating or cooling loads in buildings. Thus the major part of the report deals with treatment of solar radiation in glazing systems, shading of solar and sky radiation and the computer program JULOTTA used to simulate the thermal behavior of rooms and buildings. Other parts of thermal models of buildings are more briefly discussed and included in order to give an overview of existing problems and available solutions. A brief presentation of how thermal models can be built up is also given and it is a hope that the report can be useful as an introduction to this part of building physics as well as during development of calculation methods and computer programs. The report may also serve as a help for the users of energy related programs. Independent of which method or program a user choose to work with it is his or her own responsibility to understand the limits of the tool, else wrong conclusions may be drawn from the results 52 refs, 22 figs, 4 tabs

  10. Children's Fitness. Managing a Running Program.

    Science.gov (United States)

    Hinkle, J. Scott; Tuckman, Bruce W.

    1987-01-01

    A running program to increase the cardiovascular fitness levels of fourth-, fifth-, and sixth-grade children is described. Discussed are the running environment, implementation of a running program, feedback, and reinforcement. (MT)

  11. Financial Management: Emergency Steel Loan Guarantee Program

    National Research Council Canada - National Science Library

    2001-01-01

    In a February 1, 2001 letter, you expressed concerns about repayments of federally guaranteed loans by borrowers under the Emergency Steel Loan Guarantee Program and the effect of the program on the U.S. steel industry...

  12. Program Management Officer | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    English · Français ... Reviews project and program material and prepares synthesis documents of results, decisions, and directions for team discussion; Researches specific topics of interest to the program to enrich the knowledge of team ...

  13. Radiological control technician: Training program management manual

    International Nuclear Information System (INIS)

    1992-10-01

    This manual defines and describes the DOE Radiological Control Technician Core Training Program qualification and training process, material development requirements, standards and policies, and administration. The manual applies to Radiological Control Technician Training Programs at all DOE contractor sites

  14. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  15. Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch

    International Nuclear Information System (INIS)

    Cheng Chuntian; Liao Shengli; Tang Zitian; Zhao Mingyan

    2009-01-01

    Dynamic programming (DP) is one of classic and sophisticated optimization methods that have successfully been applied to solve the problem of hydro unit load dispatch (HULD). However, DP will be faced with the curse of dimensionality with the increase of unit number and installed generating capacity of hydropower station. With the appearance of the huge hydropower station similar to the Three George with 26 generators of 700 MW, it is hard to apply the DP to large scale HULD problem. It is crucial to seek for other optimization techniques in order to improve the operation quality and efficiency. Different with the most of literature about power generation scheduling that focused on the comparisons of novel PSO algorithms with other techniques, the paper will pay emphasis on comparison study of PSO with DP based on a case hydropower station. The objective of study is to seek for an effective and feasible method for the large scale of hydropower station of the current and future in China. This paper first compares the performance of PSO and DP using a sample load curve of the Wujiangdu hydropower plant located in the upper stream of the Yangtze River in China and contained five units with the installed capacity of 1250 MW. Next, the effect of different load interval and unit number on the optimal results and efficiency of two methods has also been implemented. The comparison results show that the PSO is feasible for HULD. Furthermore, we simulated the effect of the magnitude of unit number and load capacity on the optimal results and cost time. The simulation comparisons show that PSO has a great advantage over DP in the efficiency and will be one of effective methods for HULD problem of huge hydropower stations.

  16. Large LOCA-earthquake combination probability assessment - Load combination program. Project 1 summary report

    Energy Technology Data Exchange (ETDEWEB)

    Lu, S; Streit, R D; Chou, C K

    1980-01-01

    This report summarizes work performed for the U.S. Nuclear Regulatory Commission (NRC) by the Load Combination Program at the Lawrence Livermore National Laboratory to establish a technical basis for the NRC to use in reassessing its requirement that earthquake and large loss-of-coolant accident (LOCA) loads be combined in the design of nuclear power plants. A systematic probabilistic approach is used to treat the random nature of earthquake and transient loading to estimate the probability of large LOCAs that are directly and indirectly induced by earthquakes. A large LOCA is defined in this report as a double-ended guillotine break of the primary reactor coolant loop piping (the hot leg, cold leg, and crossover) of a pressurized water reactor (PWR). Unit 1 of the Zion Nuclear Power Plant, a four-loop PWR-1, is used for this study. To estimate the probability of a large LOCA directly induced by earthquakes, only fatigue crack growth resulting from the combined effects of thermal, pressure, seismic, and other cyclic loads is considered. Fatigue crack growth is simulated with a deterministic fracture mechanics model that incorporates stochastic inputs of initial crack size distribution, material properties, stress histories, and leak detection probability. Results of the simulation indicate that the probability of a double-ended guillotine break, either with or without an earthquake, is very small (on the order of 10{sup -12}). The probability of a leak was found to be several orders of magnitude greater than that of a complete pipe rupture. A limited investigation involving engineering judgment of a double-ended guillotine break indirectly induced by an earthquake is also reported. (author)

  17. Large LOCA-earthquake combination probability assessment - Load combination program. Project 1 summary report

    International Nuclear Information System (INIS)

    Lu, S.; Streit, R.D.; Chou, C.K.

    1980-01-01

    This report summarizes work performed for the U.S. Nuclear Regulatory Commission (NRC) by the Load Combination Program at the Lawrence Livermore National Laboratory to establish a technical basis for the NRC to use in reassessing its requirement that earthquake and large loss-of-coolant accident (LOCA) loads be combined in the design of nuclear power plants. A systematic probabilistic approach is used to treat the random nature of earthquake and transient loading to estimate the probability of large LOCAs that are directly and indirectly induced by earthquakes. A large LOCA is defined in this report as a double-ended guillotine break of the primary reactor coolant loop piping (the hot leg, cold leg, and crossover) of a pressurized water reactor (PWR). Unit 1 of the Zion Nuclear Power Plant, a four-loop PWR-1, is used for this study. To estimate the probability of a large LOCA directly induced by earthquakes, only fatigue crack growth resulting from the combined effects of thermal, pressure, seismic, and other cyclic loads is considered. Fatigue crack growth is simulated with a deterministic fracture mechanics model that incorporates stochastic inputs of initial crack size distribution, material properties, stress histories, and leak detection probability. Results of the simulation indicate that the probability of a double-ended guillotine break, either with or without an earthquake, is very small (on the order of 10 -12 ). The probability of a leak was found to be several orders of magnitude greater than that of a complete pipe rupture. A limited investigation involving engineering judgment of a double-ended guillotine break indirectly induced by an earthquake is also reported. (author)

  18. Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch

    Energy Technology Data Exchange (ETDEWEB)

    Cheng Chuntian, E-mail: ctcheng@dlut.edu.c [Department of Civil and Hydraulic Engineering, Dalian University of Technology, 116024 Dalian (China); Liao Shengli; Tang Zitian [Department of Civil and Hydraulic Engineering, Dalian University of Technology, 116024 Dalian (China); Zhao Mingyan [Department of Environmental Science and Engineering, Tsinghua University, 100084 Beijing (China)

    2009-12-15

    Dynamic programming (DP) is one of classic and sophisticated optimization methods that have successfully been applied to solve the problem of hydro unit load dispatch (HULD). However, DP will be faced with the curse of dimensionality with the increase of unit number and installed generating capacity of hydropower station. With the appearance of the huge hydropower station similar to the Three George with 26 generators of 700 MW, it is hard to apply the DP to large scale HULD problem. It is crucial to seek for other optimization techniques in order to improve the operation quality and efficiency. Different with the most of literature about power generation scheduling that focused on the comparisons of novel PSO algorithms with other techniques, the paper will pay emphasis on comparison study of PSO with DP based on a case hydropower station. The objective of study is to seek for an effective and feasible method for the large scale of hydropower station of the current and future in China. This paper first compares the performance of PSO and DP using a sample load curve of the Wujiangdu hydropower plant located in the upper stream of the Yangtze River in China and contained five units with the installed capacity of 1250 MW. Next, the effect of different load interval and unit number on the optimal results and efficiency of two methods has also been implemented. The comparison results show that the PSO is feasible for HULD. Furthermore, we simulated the effect of the magnitude of unit number and load capacity on the optimal results and cost time. The simulation comparisons show that PSO has a great advantage over DP in the efficiency and will be one of effective methods for HULD problem of huge hydropower stations.

  19. Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch

    Energy Technology Data Exchange (ETDEWEB)

    Chun-tian Cheng; Sheng-li Liao; Zi-Tian Tang [Dept. of Civil and Hydraulic Engineering, Dalian Univ. of Technology, 116024 Dalian (China); Ming-yan Zhao [Dept. of Environmental Science and Engineering, Tsinghua Univ., 100084 Beijing (China)

    2009-12-15

    Dynamic programming (DP) is one of classic and sophisticated optimization methods that have successfully been applied to solve the problem of hydro unit load dispatch (HULD). However, DP will be faced with the curse of dimensionality with the increase of unit number and installed generating capacity of hydropower station. With the appearance of the huge hydropower station similar to the Three George with 26 generators of 700 MW, it is hard to apply the DP to large scale HULD problem. It is crucial to seek for other optimization techniques in order to improve the operation quality and efficiency. Different with the most of literature about power generation scheduling that focused on the comparisons of novel PSO algorithms with other techniques, the paper will pay emphasis on comparison study of PSO with DP based on a case hydropower station. The objective of study is to seek for an effective and feasible method for the large scale of hydropower station of the current and future in China. This paper first compares the performance of PSO and DP using a sample load curve of the Wujiangdu hydropower plant located in the upper stream of the Yangtze River in China and contained five units with the installed capacity of 1250 MW. Next, the effect of different load interval and unit number on the optimal results and efficiency of two methods has also been implemented. The comparison results show that the PSO is feasible for HULD. Furthermore, we simulated the effect of the magnitude of unit number and load capacity on the optimal results and cost time. The simulation comparisons show that PSO has a great advantage over DP in the efficiency and will be one of effective methods for HULD problem of huge hydropower stations. (author)

  20. Effect of Nutrient Management Planning on Crop Yield, Nitrate Leaching and Sediment Loading in Thomas Brook Watershed

    Science.gov (United States)

    Amon-Armah, Frederick; Yiridoe, Emmanuel K.; Ahmad, Nafees H. M.; Hebb, Dale; Jamieson, Rob; Burton, David; Madani, Ali

    2013-11-01

    Government priorities on provincial Nutrient Management Planning (NMP) programs include improving the program effectiveness for environmental quality protection, and promoting more widespread adoption. Understanding the effect of NMP on both crop yield and key water-quality parameters in agricultural watersheds requires a comprehensive evaluation that takes into consideration important NMP attributes and location-specific farming conditions. This study applied the Soil and Water Assessment Tool (SWAT) to investigate the effects of crop and rotation sequence, tillage type, and nutrient N application rate on crop yield and the associated groundwater leaching and sediment loss. The SWAT model was applied to the Thomas Brook Watershed, located in the most intensively managed agricultural region of Nova Scotia, Canada. Cropping systems evaluated included seven fertilizer application rates and two tillage systems (i.e., conventional tillage and no-till). The analysis reflected cropping systems commonly managed by farmers in the Annapolis Valley region, including grain corn-based and potato-based cropping systems, and a vegetable-horticulture system. ANOVA models were developed and used to assess the effects of crop management choices on crop yield and two water-quality parameters (i.e., leaching and sediment loading). Results suggest that existing recommended N-fertilizer rate can be reduced by 10-25 %, for grain crop production, to significantly lower leaching ( P > 0.05) while optimizing the crop yield. The analysis identified the nutrient N rates in combination with specific crops and rotation systems that can be used to manage leaching while balancing impacts on crop yields within the watershed.

  1. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  2. Managing Student Affairs Programs: Methods, Models, Muddles.

    Science.gov (United States)

    Deegan, William L.

    Management processes and problems are examined in a variety of student affairs contexts. This book (1) proposes a theoretical framework for the analysis of management functions in colleges and universities, (2) studies the practice of management in several different student affairs contexts to uncover current practices, issues, problems, and…

  3. Gravel roads management : volume 3, gravel roads management : programming guide.

    Science.gov (United States)

    2010-10-01

    This report establishes procedures for managing dirt and gravel roads, with a primary focus on smaller agencies, such as Wyoming counties, that must manage their roads with very limited resources. The report strives, first, to guide and assist smalle...

  4. The FAA/NASA flight loads monitoring program - The prototype system and its benefits for the aviation community

    Science.gov (United States)

    Whitehead, Julia H.; Thomas, Mitchel E.; Carrelli, David J.; Crabill, Norman L.

    1992-01-01

    The FAA established the flight load monitoring program to collect a data base of typical flight operational loads experienced by commercial transports. This system will provide a comprehensive monitoring of aircraft loading conditions with over 20 flight parameters being recorded simultaneously. NASA is designing and testing a prototype data collection and analysis system which will be implemented into an FAA operational program. This paper presents the program's objectives and the proposed development testing on a commercial Boeing 737-400. The prototype system, its data processing schemes, and reports are described. The searching criteria or flight attributes generated for each flight are listed. The data processing system will provide the aviation community with a powerful tool for the study of transport flight loading conditions and the system's flexibility will accommodate individual studies and specialized concerns.

  5. Assurance management program for the 30 Nova laser fusion project

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  6. PROGER - Management program for radioactive wastes in research institutions

    International Nuclear Information System (INIS)

    Ferreira, Rubemar S.; Costa, Maria Regina Ferro; Ramos Junior, Anthenor C.; Esposito, Irapoan; Vaz, Solange dos Reis e; Pontedeiro, Elizabeth May; Gomes, Carlos de Almeida

    1997-01-01

    This article demonstrates the feasibility of a program, denominated PROGER, and aimed at the improvement of radioactive waste management activities in research institutions in Brazil. This program involves implementation, correction and updating of waste management techniques in those institutions that already possess a waste management system or its full set-up for the institutions where it is non-existent. Partial results are presented, concerning characteristics and quantities of wastes, and the methodology utilized by PROGER discussed

  7. Modified benchmarking study of program management within a matrix structure

    OpenAIRE

    Fuller, Robin S.

    1996-01-01

    This thesis sought to identify several organizations representing both the government and commercial industry that were successful in implementing program management within a matrix structure to isolate best-practices that lead to superior performance. Research data were gathered from current and former program managers from these organizations. These managers were queried about their experiences with the matrix structure: the matrix implementation process, benefits, pitfalls, and lessons lea...

  8. [The German program for disease management guidelines--implementation with pathways and quality management].

    Science.gov (United States)

    Ollenschläger, Günter; Lelgemann, Monika; Kopp, Ina

    2007-07-15

    In Germany, physicians enrolled in disease management programs are legally obliged to follow evidence-based clinical practice guidelines. That is why a Program for National Disease Management Guidelines (German DM-CPG Program) was established in 2002 aiming at implementation of best-practice evidence-based recommendations for nationwide as well as regional disease management programs. Against this background the article reviews programs, methods and tools for implementing DM-CPGs via clinical pathways as well as regional guidelines for outpatient care. Special reference is given to the institutionalized program of adapting DM-CPGs for regional use by primary-care physicians in the State of Hesse.

  9. 75 FR 30106 - Terrorism Risk Insurance Program; Litigation Management Submissions

    Science.gov (United States)

    2010-05-28

    ... DEPARTMENT OF THE TREASURY Terrorism Risk Insurance Program; Litigation Management Submissions... U.S.C. 3506(c)(2)(A)). Currently, the Terrorism Risk Insurance Program Office is seeking comments... or by mail (if hard copy, preferably an original and two copies) to: Terrorism Risk Insurance Program...

  10. Timber management planning with timber ram and goal programming

    Science.gov (United States)

    Richard C. Field

    1978-01-01

    By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...

  11. Effects of a pain program on nurses' pharmacological pain management

    NARCIS (Netherlands)

    Francke, AL; Dingemans, WA; Borg, PAJ; Luiken, JB; Grypdonck, M; Abu-Saad, HH

    1999-01-01

    Surgical nurses from five Dutch general hospitals participated in a continuing education program on pain assessment and management. Effects of the program were measured in a pretest-post-test control group design, in which nursing wards were randomly allocated to the experimental condition (program)

  12. Building Maintenance and Utilities Management. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance and utilities management program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary…

  13. 76 FR 80342 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2011-12-23

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Coastal Zone Management... program under the Coastal Zone Management Act (CZMA), as amended at 16 U.S.C. 1451-1466, and the...). SUPPLEMENTARY INFORMATION: The Coastal Zone Management Act authorizes the Secretary of Commerce (Secretary) to...

  14. Anger Management Program Participants Gain Behavioral Changes in Interpersonal Relationships

    Science.gov (United States)

    Pish, Suzanne; Clark-Jones, Teresa; Eschbach, Cheryl; Tiret, Holly

    2016-01-01

    RELAX: Alternatives to Anger is an educational anger management program that helps adults understand and manage anger, develop communication skills, manage stress, and make positive behavioral changes in their interpersonal relationships. A sample of 1,168 evaluation surveys were collected from RELAX: Alternatives to Anger participants over 3…

  15. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  16. Waste management program at Atomic Energy of Canada Limited

    Energy Technology Data Exchange (ETDEWEB)

    Wong, P.C.F.; Chan, N.; Hawrelluk, K. [Atomic Energy of Canada Limited, Chalk River, ON (Canada)

    2011-07-01

    The Atomic Energy of Canada Limited (AECL) Waste Management Program establishes requirements for waste management activities at AECL sites in Canada. It ensures that activities involving planning for, handling, processing, transporting, storage and long-term management of wastes are performed in a manner that protects the workers, the public, and the environment, and are in compliance with applicable regulatory and licence requirements. The program translates applicable legal requirements into program requirements appropriate for AECL, and assists AECL management in implementing those requirements. The Waste Management Program was formally established at AECL in 2007 as one of the nuclear programs. The activities conducted in the first two years (2007 - 09) were mainly focused on program development. Currently the program is executing the waste management improvement initiatives based on the Waste Management Program Improvement Plan. During the program implementation, close collaboration between the Waste Management Program and other departments resulted in improved waste management performance at Chalk River Laboratories (CRL). This included increased segregation of the waste at the source, reduction in waste generation, improved labeling and identification of waste packages, improved recyclables collection and initiating recycling of selected hazardous wastes. In accordance with pollution prevention, the quantities and degree of hazard of wastes requiring long-term management shall be minimized, following the principles of Prevent, Reduce, Reuse, and Recycle. The annual volume of solid waste generated is one of the key indicators for waste management performance. AECL has been successful in reduction of operational waste and diversion of materials for recycling at CRL. From 2007 to 2010, the annual volume of solid waste, including inactive and radioactive wastes, generated from routine operations at CRL decreased by 26%, and the annual amount of recyclables sent

  17. Waste management program at Atomic Energy of Canada Limited

    International Nuclear Information System (INIS)

    Wong, P.C.F.; Chan, N.; Hawrelluk, K.

    2011-01-01

    The Atomic Energy of Canada Limited (AECL) Waste Management Program establishes requirements for waste management activities at AECL sites in Canada. It ensures that activities involving planning for, handling, processing, transporting, storage and long-term management of wastes are performed in a manner that protects the workers, the public, and the environment, and are in compliance with applicable regulatory and licence requirements. The program translates applicable legal requirements into program requirements appropriate for AECL, and assists AECL management in implementing those requirements. The Waste Management Program was formally established at AECL in 2007 as one of the nuclear programs. The activities conducted in the first two years (2007 - 09) were mainly focused on program development. Currently the program is executing the waste management improvement initiatives based on the Waste Management Program Improvement Plan. During the program implementation, close collaboration between the Waste Management Program and other departments resulted in improved waste management performance at Chalk River Laboratories (CRL). This included increased segregation of the waste at the source, reduction in waste generation, improved labeling and identification of waste packages, improved recyclables collection and initiating recycling of selected hazardous wastes. In accordance with pollution prevention, the quantities and degree of hazard of wastes requiring long-term management shall be minimized, following the principles of Prevent, Reduce, Reuse, and Recycle. The annual volume of solid waste generated is one of the key indicators for waste management performance. AECL has been successful in reduction of operational waste and diversion of materials for recycling at CRL. From 2007 to 2010, the annual volume of solid waste, including inactive and radioactive wastes, generated from routine operations at CRL decreased by 26%, and the annual amount of recyclables sent

  18. NEPTUNE Helping Program Managers Understand Their Program Customers

    National Research Council Canada - National Science Library

    Uriell, Zannette

    2004-01-01

    .... This annotated brief outlines some of these studies and discusses in greater detail a recent project that assessed a number of dissimilar programs, leading to the creation of the NEPTUNE System...

  19. Significant ELCAP analysis results: Summary report. [End-use Load and Consumer Assessment Program

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, R.G.; Conner, C.C.; Drost, M.K.; Miller, N.E.; Cooke, B.A.; Halverson, M.A.; Lebaron, B.A.; Lucas, R.G.; Jo, J.; Richman, E.E.; Sandusky, W.F. (Pacific Northwest Lab., Richland, WA (USA)); Ritland, K.G. (Ritland Associates, Seattle, WA (USA)); Taylor, M.E. (USDOE Bonneville Power Administration, Portland, OR (USA)); Hauser, S.G. (Solar Energy Research Inst., Golden, CO (USA))

    1991-02-01

    The evolution of the End-Use Load and Consumer Assessment Program (ELCAP) since 1983 at Bonneville Power Administration (Bonneville) has been eventful and somewhat tortuous. The birth pangs of a data set so large and encompassing as this have been overwhelming at times. The early adolescent stage of data set development and use has now been reached and preliminary results of early analyses of the data are becoming well known. However, the full maturity of the data set and the corresponding wealth of analytic insights are not fully realized. This document is in some sense a milestone in the brief history of the program. It is a summary of the results of the first five years of the program, principally containing excerpts from a number of previous reports. It is meant to highlight significant accomplishments and analytical results, with a focus on the principal results. Many of the results have a broad application in the utility load research community in general, although the real breadth of the data set remains largely unexplored. The first section of the document introduces the data set: how the buildings were selected, how the metering equipment was installed, and how the data set has been prepared for analysis. Each of the sections that follow the introduction summarize a particular analytic result. A large majority of the analyses to date involve the residential samples, as these were installed first and had highest priority on the analytic agenda. Two exploratory analyses using commercial data are included as an introduction to the commercial analyses that are currently underway. Most of the sections reference more complete technical reports which the reader should refer to for details of the methodology and for more complete discussion of the results. Sections have been processed separately for inclusion on the data base.

  20. Acquisition: Implementation of the DoD Management Control Program for Navy Acquisition Category II and III Programs

    National Research Council Canada - National Science Library

    2004-01-01

    ... deviations in cost, schedule, and performance requirements in acquisition program baselines for Acquisition Category II and III programs and in identifying whether program managers are reporting...

  1. Design and implementation of an external quality assessment program for HIV viral load measurements using dried blood spots.

    Science.gov (United States)

    Prach, Lisa M; Puren, Adrian; Lippman, Sheri A; Carmona, Sergio; Stephenson, Sophie; Cutler, Ewalde; Barnhart, Scott; Liegler, Teri

    2015-03-01

    An external quality assurance program was developed for HIV-1 RNA viral load measurements taken from dried blood spots using a reference panel and field-collected specimens. The program demonstrated that accurate and reproducible quantitation can be obtained from field-collected specimens. Residual proviral DNA may confound interpretation in virologically suppressed subjects. Copyright © 2015, American Society for Microbiology. All Rights Reserved.

  2. Management of nonregulatory driven program risks

    International Nuclear Information System (INIS)

    Nielsen, R.R.; Hutterman, L.L.

    1995-01-01

    Evaluation of program risk is a significant part of any environmental restoration (ER) activity. While significant efforts have been made to assess risk to human health and the environment, program risks outside of CERCLA are handled on a fire drill basis. This paper explains a process that looks at program risk, directs mitigation efforts in the most useful path, and focuses corrective actions to obtain the most benefits from the resources used

  3. Definitional-mission report: Demand-side management program for the Tenaga Nasional Berhad in Malaysia. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    A definitional mission evaluated the prospects of the US Trade and Development Program (TDP) funding a market demonstration of a Demand Side Management (DSM) program being developed by the Tenaga Nasional Berhad (TNB) in Malaysia. TNB is the national electric utility of Malaysia with the responsibility to promote economically efficient supply of electricity needed for the economic development of Peninsular Malaysia. DSM is a utility-financed program to affect energy savings at the enduse level thereby reducing peak and base loads. Historically, TNB has taken the peak load and the load duration curves as given in planning and implementing the least-cost generation expansion strategy. It has refrained from influencing the pattern of energy use by the customer through any means other than tariff structures and levels. The experience of many utilities with DSM in the U.S. offers TNB an opportunity to develop a suitable DSM program for Malaysia.

  4. Combining Ecosystem Service and Critical Load Concepts for Resource Management and Public Policy

    Directory of Open Access Journals (Sweden)

    Timothy J. Sullivan

    2012-11-01

    Full Text Available Land management and natural resource public policy decision-making in the United States can benefit from two resource damage/recovery concepts: ecosystem service (ES and critical load (CL. The purpose of this paper is to suggest an integrated approach to the application of ES and CL principles for public land management and natural resource policy decision-making. One well known example that is appropriate for ES and CL evaluation is examined here: the acidification of soil and drainage water by atmospheric deposition of acidifying sulfur and nitrogen compounds. A conceptual framework illustrates how the ES and CL approaches can be combined in a way that enhances the strengths of each. This framework will aid in the process of translating ES and CL principles into land management and natural resource policy decision-making by documenting the impacts of pollution on environmental goods and services that benefit humans.

  5. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  6. Probability-based load combinations for design of category I structures - overview of research program and recent results

    International Nuclear Information System (INIS)

    Reich, M.; Hwang, H.

    1984-01-01

    This paper discusses the probability-based load combinations for the program dealing with the design of Category I structures, currently being worked on at Brookhaven National Laboratory (BNL) for the Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission (NRC). The objective of this program is to develop a probabilistic approach for the safety evaluations of reactor containments and other seismic Category I structures subjected to multiple static and dynamic loadings. Furthermore, on the basis of the developed probabilistic approach, a load combination methodology for the design of seismic Category I structures will also be established. The major tasks of this program are: (1) establish probabilistic representations for various loads and structural resistance, (2) select appropriate structural analysis methods and identify limit states of structures, (3) develop a reliability analysis method applicable to nuclear structures, (4) apply the developed methodology to existing Category I structures in order to evaluate the reliability levels implied in the current design criteria, and (5) recommend load combination design criteria for Category I structures. When the program is completed, it will be possible to (1) provide a method that can evaluate the safety margins of existing containment and other Category I structures and (2) recommended probability-based load combinations and load factors for the design of Category I structures. At the present time, a reliability analysis method for seismic Category I concrete structures has been completed. By utilizing this method, it is possible to evaluate the safety of structures under various static and dynamic loads. In this paper, results of a reliability analysis of a realistic reinforced concrete containment structure under dead load, accidental pressure, and earthquake ground acceleration are presented to demonstrate the feasibility of the methodology. (orig.)

  7. Training Programs for Managing Well-being in Companies

    Directory of Open Access Journals (Sweden)

    Treven Sonja

    2015-08-01

    Full Text Available This paper discussed the significance of well-being (WB and well-being management (WBM. As successful WBM requires the implementation of different training programs, such programs are presented in detail. The cause–effect relationship between training and individual/organizational performance is researched as well. The aim of the research to support this article was to present WBM, its training programs, as well as the determination of WBM activities concerning the mentioned programs implemented in Slovenian organizations.

  8. Pooled inventory management: a unique cost-sharing program

    International Nuclear Information System (INIS)

    Bromenschenkel, K.E.

    1984-01-01

    A totally fresh approach to stocking an inventory of costly, long-lead-time nuclear plant equipment became a reality in January, 1981, after three years of effort to form the program. The program, known as Pooled Inventory Management (PIM), is now procuring the first equipment to be stocked in its inventory. This report describes the formation of PIM, how the program works, PIM accomplishments, equipment included in PIM stockpiles, and economics, implementation, and future plans of the program

  9. Educational support programs: Office of Civilian Radioactive Waste Management

    International Nuclear Information System (INIS)

    Williamson, R.C.

    1989-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) currently sponsors two educationally related programs: the Radioactive Waste Management Fellowship Program and the Radioactive Waste Management Research Program for Historically Black Colleges and Universities (HBCU). The graduate fellowship program was implemented in 1985 to meet the US Department of Energy's (DOE's) expected manpower needs for trained scientists and engineers to assist in carrying out the activities of the Nuclear Waste Policy Act. It is recognized that a shortage of master's and doctoral level scientists and engineers in disciplines supportive of the nation's high-level radioactive waste management (RWM) program may impede the DOE's ability to properly carry out its mission under the act. The fellowship program encourages talented undergraduate students to enter graduate programs designed to educate and train them in fields directly related to RWM. The program supports graduate students in various disciplines, including nuclear science and engineering, health physics, and certain area of geology and chemical engineering. It also encourages universities to support and improve research activities and academic programs related to the management of spent nuclear fuel and high-level radioactive waste

  10. Nurse manager residency program: an innovative leadership succession plan.

    Science.gov (United States)

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  11. Hazardous Waste Remedial Actions Program: integrating waste management

    International Nuclear Information System (INIS)

    Petty, J.L.; Sharples, F.E.

    1986-01-01

    The Hazardous Waste Remedial Actions Program was established to integrate Defense Programs' activities in hazardous and mixed waste management. The Program currently provides centralized planning and technical support to the Office of the Assistant Secretary for Defense Programs. More direct project management responsibilities may be assumed in the future. The Program, under the direction of the ASDP's Office of Defense Waste and Transportation Management, interacts with numerous organizational entities of the Department. The Oak Ridge Operations Office has been designated as the Lead Field Office. The Program's four current components cover remedial action project identification and prioritization; technology adaptation; an informative system; and a strategy study for long-term, ''corporate'' project and facility planning

  12. National Syrian Program for Radioactive Waste Management

    International Nuclear Information System (INIS)

    Othman, I.; Takriti, S.

    2009-06-01

    A national plan for radioactive waste management has been presented. It includes identifying, transport, recording, classifying, processing and disposal. It is an important reference for radioactive waste management for those dealing with radioactive waste, and presents a complete protection to environemnt and people. (author)

  13. TRU Waste Management Program. Cost/schedule optimization analysis

    International Nuclear Information System (INIS)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions

  14. Waste Management Program. Technical progress report, October-December 1982

    International Nuclear Information System (INIS)

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities

  15. Philosophy and overview of the INEL waste management program

    International Nuclear Information System (INIS)

    Gertz, C.P.; Whitsett, J.B.; Hamric, J.P.

    1986-01-01

    The INEL philosophy of ''get the job done; do it right--the first time'' is described as it applies to all phases of waste management activities. In addition, an overview of INEL's waste management programs and projects--low-level waste management operations and technology development; transuranic waste management operations and technology development; high-level waste management operations and technology development; spent fuel storage operations and equipment/technology development; transportation operations, technology development, and prototype cask procurements--are discussed. Emphasis is placed on the application of the INEL philosophy to the successful initiation and continuation of INEL waste management activities

  16. User`s Guide for the NREL Force and Loads Analysis Program. Version 2.2

    Energy Technology Data Exchange (ETDEWEB)

    Wright, A D

    1992-08-01

    The following report gives the reader an overview of and instructions on the proper use of the National Renewable Energy Laboratory Force and Loads Analysis Program (FLAP, version 2.2). It is intended as a tool for prediction of rotor and blade loads and response for two- or three-bladed rigid hub wind turbines. The effects of turbulence are accounted for. The objectives of the report are to give an overview of the code and also show the methods of data input and correct code execution steps in order to model an example two-bladed rigid hub turbine. A large portion of the discussion (Sections 6.0, 7.0, and 8.0) is devoted to the subject of inputting and running the code for wind turbulence effects. The ability to include turbulent wind effects is perhaps the biggest change in the code since the release of FLAP version 2.01 in 1988. This report is intended to be a user`s guide. It does not contain a theoretical discussion on equations of motion, assumptions, underlying theory, etc. It is intended to be used in conjunction with Wright, Buhl, and Thresher (1988).

  17. The cryogenic cooling program in high-heat-load optics at the Advanced Photon Source

    International Nuclear Information System (INIS)

    Rogers, C.S.

    1993-07-01

    This paper describes some of the aspects of the cryogenic optics program at the Advanced Photon Source (APS). A liquid-nitrogen-cooled, high-vacuum, double crystal monochromator is being fabricated at Argonne National Laboratory (ANL). A pumping system capable of delivering a variable flow rate of up to 10 gallons per minute of pressurized liquid nitrogen and removing 5 kilowatts of x-ray power is also being constructed. This specialized pumping system and monochromator will be used to test the viability of cryogenically cooled, high-heat-load synchrotron optics. It has been determined that heat transfer enhancement will be required for optics used with APS insertion devices. An analysis of a porous-matrix-enhanced monochromator crystal is presented. For the particular case investigated, a heat transfer enhancement factor of 5 to 6 was calculated

  18. Management and Fragmentation of a Network Program

    DEFF Research Database (Denmark)

    Jørgensen, Kenneth Mølbjerg

    This paper contains an analysis of the role of identity in interorganizational collaboration. The case is a network program that involved three parties: eight companies, one consulting institution and a research institution. The purpose of the network program was to develop and test concepts...... and methods within organizational learning and it was supported by the Danish government. The three parties had different roles in the program. The eight companies all participated as experiments for organizational learning. Consultants from the consulting institution acted as consultants on the eight...

  19. Load Shifting Control and Management of Domestic Microgeneration Systems for Improved Energy Efficiency and Comfort

    DEFF Research Database (Denmark)

    Anvari-Moghaddam, Amjad; Quintero, Juan Carlos Vasquez; Guerrero, Josep M.

    2015-01-01

    In this paper, an intelligent energy management system based on energy saving and user’s comfort is introduced and applied to a residential smart home as a case study. The proposed multi-objective mixed-integer nonlinear programming (MINLP)-based architecture takes the advantages of several key...

  20. Hanford Site Groundwater Protection Management Program: Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime, (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site

  1. Defense Leadership and Management Program (DLAMP)

    National Research Council Canada - National Science Library

    Ramp, S

    1997-01-01

    This Directive, under Chapters 23, 33, 41, and 71 of title 5, United States Code, establishes policy and assigns responsibilities for a program of civilian leader training, education, and development...

  2. Best Management Practices, Policies and Programs

    Science.gov (United States)

    The National Great Practice Compendium highlights outstanding activities, technologies, and programs that prevent trash from entering the aquatic environment and/or that reduce the overall volume of trash that is generated.

  3. Program Management Officer -Think Tank Initiative | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    English · Français ... minutes and meeting reports of a technical nature to ensure discussions and decisions are well documented ... the Centre; Reviews project and program material and prepares synthesis documents of results, decisions, ...

  4. Information Management and Employee Assistance Program Imperatives.

    Science.gov (United States)

    Bickerton, Richard

    1987-01-01

    The ALMACA Clearinghouse for Employee Assistance Program (EAP) Information collects and disseminates EAP-specific data to provide subscribers with information to maintain their own competence and to improve upon the understanding and use of EAP practices and procedures. (JOW)

  5. DOE waste management program-current and future

    International Nuclear Information System (INIS)

    Coleman, J.A.

    1993-01-01

    The back end of the nuclear fuel cycle, as well as many operations in the Department of Energy, involves management of radioactive and hazardous waste and spent nuclear fuel. Described herein is the current and anticipated Department's Waste Management Program and general information about the Program for managing and disposing of waste that will illustrate the importance of air cleaning and treatment in assuring protection of the public and our environment. The structure and responsibilities of the Office of Environmental Restoration and Waste Management (EM) are described. The categories of waste managed by the Office of Waste Management (OWM) are defined. The problems of waste management, waste minimization, and waste treatment, storage, and disposal are discussed. 4 figs

  6. 78 FR 24212 - Tribal Management Grant Program

    Science.gov (United States)

    2013-04-24

    ... eligible to receive this grant only if it is incorporated for the primary purpose of improving AI/AN health... that will impact their management capability or prepare them for future improvements to their...

  7. DoD Records Management Program

    National Research Council Canada - National Science Library

    Arnason, C

    1997-01-01

    ... title 36, Code of Federal Regulations, Chapter XII, 'National Archives and Records Administration,' Subchapter B, 'Records Management,' under the Assistant Secretary of Defense for Command, Control, Communications and Intelligence (ASD(C3I...

  8. Small Business and the Risk Management Program

    Science.gov (United States)

    This factsheet helps small businesses comply with the regulation requiring companies that use regulated substances, hazardous chemical such as ammonia and chlorine, to develop a risk management plan, to help prevent accidental toxic or flammable releases.

  9. Program Director Participation in a Leadership and Management Skills Fellowship and Characteristics of Program Quality.

    Science.gov (United States)

    Carek, Peter J; Mims, Lisa D; Conry, Colleen M; Maxwell, Lisa; Greenwood, Vicki; Pugno, Perry A

    2015-01-01

    The association between a residency program director completing a leadership and management skills fellowship and characteristics of quality and innovation of his/her residency program has not been studied. Therefore, the aim of this study is to examine the association between a residency program director's completion of a specific fellowship addressing these skills (National Institute for Program Director Development or NIPDD) and characteristics of quality and innovation of the program they direct. Using information from the American Academy of Family Physicians (AAFP), National Resident Matching Program (NRMP) and FREIDA® program characteristics were obtained. Descriptive statistics were used to summarize the data. The relationship between programs with a NIPDD graduate as director and program quality measures and indicators of innovation was analyzed using both chi square and logistic regression. Initial analyses showed significant associations between the NIPDD graduate status of a program director and regional location, mean years of program director tenure, and the program's 5-year aggregate ABFM board pass rate from 2007--2011. After grouping the programs into tertiles, the regression model showed significant positive associations with programs offering international experiences and being a NIPDD graduate. Program director participation in a fellowship addressing leadership and management skills (ie, NIPDD) was found to be associated with higher pass rates of new graduates on a Board certification examination and predictive of programs being in the upper tertile of programs in terms of Board pass rates.

  10. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  11. 77 FR 55895 - Meeting: RTCA Program Management Committee (PMC)

    Science.gov (United States)

    2012-09-11

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Meeting: RTCA Program Management Committee (PMC) AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT...--Concept of Use for Aeronautical Information Services (AIS) and Meteorological (MET) Data Link Services...

  12. Managing Complex Programs in a Post-LSI Environment

    National Research Council Canada - National Science Library

    Mockensturm, Jeffery J

    2008-01-01

    .... External forces played a major role in the evolution of these practices: A defense procurement holiday throughout the 1990s significantly reduced defense procurement spending and commensurate programs to manage...

  13. Comparison of DOE and NIRMA approaches to configuration management programs

    International Nuclear Information System (INIS)

    Yang, E.Y.; Kulzick, K.C.

    1995-01-01

    One of the major management programs used for commercial, laboratory, and defense nuclear facilities is configuration management. The safe and efficient operation of a nuclear facility requires constant vigilance in maintaining the facility's design basis with its as-built condition. Numerous events have occurred that can be attributed to (either directly or indirectly) the extent to which configuration management principles have been applied. The nuclear industry, as a whole, has been addressing this management philosophy with efforts taken on by its constituent professional organizations. The purpose of this paper is to compare and contrast the implementation plans for enhancing a configuration management program as outlined in the U.S. Department of Energy's (DOE's) DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Program,close quotes with the following guidelines developed by the Nuclear Information and Records Management Association (NIRMA): 1. PP02-1994, open-quotes Position Paper on Configuration Managementclose quotes 2. PP03-1992, open-quotes Position Paper for Implementing a Configuration Management Enhancement Program for a Nuclear Facilityclose quotes 3. PP04-1994 open-quotes Position Paper for Configuration Management Information Systems.close quotes

  14. Real-Time Vehicle Energy Management System Based on Optimized Distribution of Electrical Load Power

    Directory of Open Access Journals (Sweden)

    Yuefei Wang

    2016-10-01

    Full Text Available As a result of severe environmental pressure and stringent government regulations, refined energy management for vehicles has become inevitable. To improve vehicle fuel economy, this paper presents a bus-based energy management system for the electrical system of internal combustion engine vehicles. Both the model of an intelligent alternator and the model of a lead-acid battery are discussed. According to these models, the energy management for a vehicular electrical system is formulated as a global optimal control problem which aims to minimize fuel consumption. Pontryagin’s minimum principle is applied to solve the optimal control problem to realize a real-time control strategy for electrical energy management in vehicles. The control strategy can change the output of the intelligent alternator and the battery with the changes of electrical load and driving conditions in real-time. Experimental results demonstrate that, compared to the traditional open-loop control strategy, the proposed control strategy for vehicle energy management can effectively reduce fuel consumption and the fuel consumption per 100 km is decreased by approximately 1.7%.

  15. BUCLASP 2: A computer program for instability analysis of biaxially loaded composite stiffened panels and other structures

    Science.gov (United States)

    Tripp, L. L.; Tamekuni, M.; Viswanathan, A. V.

    1973-01-01

    The use of the computer program BUCLASP2 is described. The program is intended for linear instability analyses of structures such as unidirectionally stiffened panels. Any structure that has a constant cross section in one direction, that may be idealized as an assemblage of beam elements and laminated flat and curved plant strip elements can be analyzed. The loadings considered are combinations of axial compressive loads and in-plane transverse loads. The two parallel ends of the panel must be simply supported and arbitrary elastic boundary conditions may be imposed along any one or both external longitudinal side. This manual consists of instructions for use of the program with sample problems, including input and output information. The theoretical basis of BUCLASP2 and correlations of calculated results with known solutions, are presented.

  16. NASA Space Flight Program and Project Management Handbook

    Science.gov (United States)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  17. Remote sensing in operational range management programs in Western Canada

    Science.gov (United States)

    Thompson, M. D.

    1977-01-01

    A pilot program carried out in Western Canada to test remote sensing under semi-operational conditions and display its applicability to operational range management programs was described. Four agencies were involved in the program, two in Alberta and two in Manitoba. Each had different objectives and needs for remote sensing within its range management programs, and each was generally unfamiliar with remote sensing techniques and their applications. Personnel with experience and expertise in the remote sensing and range management fields worked with the agency personnel through every phase of the pilot program. Results indicate that these agencies have found remote sensing to be a cost effective tool and will begin to utilize remote sensing in their operational work during ensuing seasons.

  18. Radioactive Waste Management Fellowship Program: Summary of program activities for calendar year 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This document describes a graduate fellowship program designed to guide future scientists and engineers toward a career in high level radioactive waste management. Oak Ridge Associated Universities administers this program on behalf of 17 participating universities. The report summarizes the background and qualifications of the last year's applicants and awardees and provides examples of the distributed literature describing the program. 8 figs

  19. Cost benefit analysis of the demand side management programs

    International Nuclear Information System (INIS)

    Schechtman, R.; Baum, M.

    1989-01-01

    The several cost and benefit components of the demand side management programs for the society groups, including the concessionaire, consumers and society as a whole are studied. The rule evaluations of management programs by demand side, used by North American concessionaire are also discussed. Finally, the numerical examples, that consolidating the concepts and rules evaluation are presented. (C.G.C.). 5 refs, 1 fig, 3 tabs

  20. Configuration management program plan for Hanford site systems engineering

    International Nuclear Information System (INIS)

    Hoffman, A.G.

    1994-01-01

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline

  1. Major Management Challenges and Program Risks: Small Business Administration

    Science.gov (United States)

    2001-01-01

    2001 Major Management Challenges and Program Risks Small Business AdministrationGAO-01-260 Form SF298 Citation Data Report Date ("DD MON YYYY...34) 00JAN2001 Report Type N/A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Major Management Challenges and Program Risks Small Business ...Administration (SBA) as it seeks to aid, counsel, assist, and protect the interests of the nations small businesses and help businesses and families

  2. Implementing a risk management program at Falconbridge

    International Nuclear Information System (INIS)

    Blechta, G.

    2003-01-01

    A corporate overview of Falconbridge was presented. Falconbridge, founded in 1928 is a leading producer of nickel, copper, cobalt and platinum group metals at low cost. A map displaying its worldwide locations was shown. In Canada, Falconbridge operates in Ontario and Nunavik Territory. The experience in Norway was briefly described, touching on market volatility, market intelligence, portfolio management, and risk management guidelines. The author then explained the purpose of the Energy Project Team, which was responsible for preparing for deregulation, developing strategies for purchasing energy, and minimizing the cost of purchased energy in a competitive market. The plan was described, and the emphasis placed on the core Ontario team. Communication played a large part. The management system functions were reviewed, and analysis provided. The financial integration model was presented. Risk management was dealt with, followed by market intelligence and operational hedge. Division impact was discussed. The major Falconbridge issues were: budget exposure to electricity price variability, how much fixed-price power supply and how long should the contracts be, regulatory structure, market purchase timing, and adhere to corporate risk management policy. The procurement process was described. The author concluded that the product must be kept simple and the number of products limited. A realistic schedule must by adhered to, and a short bidding period of four hours proved ideal. Supplier relationship must be consumer driven. The importance of communication plan was emphasized. Getting pre-approval to make the deal is important. tabs., figs

  3. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  4. A load predictive energy management system for supercapacitor-battery hybrid energy storage system in solar application using the Support Vector Machine

    International Nuclear Information System (INIS)

    Chia, Yen Yee; Lee, Lam Hong; Shafiabady, Niusha; Isa, Dino

    2015-01-01

    Highlights: • A novel energy management system (EMS) for supercapacitor-battery hybrid energy storage system is implemented. • It is a load predictive EMS which is implemented using Support Vector Machine (SVM). • An optimum SVM load prediction model is obtained, which yields 100% accuracy in 0.004866 s of training time. • The implemented load predictive EMS is compared with the conventional sequential programming control. • This methodology reduces the number of power electronics used and prolong battery lifespan. - Abstract: This paper presents the use of a Support Vector Machine load predictive energy management system to control the energy flow between a solar energy source, a supercapacitor-battery hybrid energy storage combination and the load. The supercapacitor-battery hybrid energy storage system is deployed in a solar energy system to improve the reliability of delivered power. The combination of batteries and supercapacitors makes use of complementary characteristic that allow the overlapping of a battery’s high energy density with a supercapacitors’ high power density. This hybrid system produces a straightforward benefit over either individual system, by taking advantage of each characteristic. When the supercapacitor caters for the instantaneous peak power which prolongs the battery lifespan, it also minimizes the system cost and ensures a greener system by reducing the number of batteries. The resulting performance is highly dependent on the energy controls implemented in the system to exploit the strengths of the energy storage devices and minimize its weaknesses. It is crucial to use energy from the supercapacitor and therefore minimize jeopardizing the power system reliability especially when there is a sudden peak power demand. This study has been divided into two stages. The first stage is to obtain the optimum SVM load prediction model, and the second stage carries out the performance comparison of the proposed SVM-load predictive

  5. Fleet wide motor asset management program

    International Nuclear Information System (INIS)

    Rosemeier, R.G.; Moxie, J.J.; Mendez, W.E.

    2011-01-01

    The Institute of Nuclear Power Operations (INPO) performed several studies concerning the effects of motor failures on US power production. Problems with aging and the lack of preventative maintenance were noted as major contributors to this production loss. Westinghouse has developed, and successfully utilized, a computer program to assist plants in the decision making process for maximizing the operational availability of their motor fleet. The program considers motors of a fleet as a single, critical to production asset, and aids the operator in decisions regarding the following: 1.) Purchase of spares. 2.) Rewind and refurbishment prioritization. 3.) Long-term budget forecasting. (author)

  6. NOSC Program Managers Handbook. Revision 1

    Science.gov (United States)

    1988-02-01

    or creating the appearance of -Using government position for private gain -Giving preferential treatment to persons or organizations -Impeding...8217.3. us d a A c f z Z 3 Zus. W-C 0 0 Z 0~c C. 2 U ca6 4 lie4 Zfe x 0- e, N W w- -3W "Z I N, WISP . -.. -W 23 -0 01 S. 0 X 2 -CNLIZ p4 p4 A-0 .30 -- c...engineering art and a management discipline. This module for project managers is a concise treatment , which only touches on the key topics and issues, of

  7. Remote control and load management of electric power distribution networks; Fjaerroevervakning och belastningsstyrning av eldistributionsnaet

    Energy Technology Data Exchange (ETDEWEB)

    Jonsson, Mats; Larsson, Mikael

    1993-02-01

    Remote control and load management increase the electricity distributors possibilities to even out the consumption of electricity for optimal usage of electricity subscription and supply system. Controlling can be done either through technology or through encouragement of off-peak consumption. There are a number of similar systems for controlling consumption, where the manufacturers have chosen different ways to solve the main problem, namely the communication. We have concentrated in examining systems which communicate through the supply system, different types of telephone connections and wireless communication links. In the future demands for better electricity consumption control will be put forward. This will bring along a greater need at distribution level for continuous monitoring of purchased and used electricity flow. The distributors will also need better possibilities to directly affect power consumption. Those manufacturers who do not use load management today should acquire experience through provincial installations in suitable areas with equipment ready for tomorrows needs and requirements. Today there are some different systems on the market that offer flexibility and ready-to-use possibilities. (3 refs., 17 figs.)

  8. Strategies in disability management. Corporate disability management programs implemented at the work site.

    Science.gov (United States)

    Kalina, C M

    1999-10-30

    Managers are challenged to demonstrate all programs as economically essential to the business, generating an appreciable return on investment. Further challenge exists to blend and integrate clinical and business objectives in program development. Disability management programs must be viewed as economically essential to the financial success of the business to assure management support for clinical interventions and return-to-work strategies essential for a successful program. This paper discusses a disability management program integrating clinical and business goals and objectives in return-to-work strategies to effect positive clinical, social-cultural, and business results. Clinical, educational, social, and economic challenges in the development, implementation, and continued management of a disability program at a large corporation with multiple global work sites are defined. Continued discussion addresses the effective clinical interventions and educational strategies utilized successfully within the workplace environment in response to each defined challenge. A multiple disciplinary team approach, clinical and business outcome measures, and quality assurance indicators are discussed as major program components. This article discusses a successful program approach focusing on business process and methodology. These parameters are used to link resources to strategy, developing a product for implementing and managing a program demonstrating economic value added through effective clinical medical case management.

  9. 75 FR 60398 - California: Proposed Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2010-09-30

    ...: Proposed Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... its hazardous waste management program by November 1, 2010. ADDRESSES: Submit your comments... waste management program. EPA continues to have independent enforcement authority under RCRA sections...

  10. 77 FR 15273 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-03-15

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... hazardous waste management program. We authorized the following revisions: Oklahoma received authorization... its program revision in accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management Act...

  11. UMTRA Project Administrative Files Collection Records Management Program

    International Nuclear Information System (INIS)

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program

  12. Power system operation risk analysis considering charging load self-management of plug-in hybrid electric vehicles

    International Nuclear Information System (INIS)

    Liu, Zhe; Wang, Dan; Jia, Hongjie; Djilali, Ned

    2014-01-01

    Highlights: • The interactive mechanism between system and PHEVs is presented. • The charging load self-management without sacrificing user requirements is proposed. • The charging load self-management is coupled to system operation risk analysis. • The charging load self-management can reduce the extra risk brought by PHEVs. • The charging load self-management can shift charging power to the time with low risk. - Abstract: Many jurisdictions around the world are supporting the adoption of electric vehicles through incentives and the deployment of a charging infrastructure to reduce greenhouse gas emissions. Plug-in hybrid electric vehicles (PHEVs), with offer mature technology and stable performance, are expected to gain an increasingly larger share of the consumer market. The aggregated effect on power grid due to large-scale penetration of PHEVs needs to be analyzed. Nighttime-charging which typically characterizes PHEVs is helpful in filling the nocturnal load valley, but random charging of large PHEV fleets at night may result in new load peaks and valleys. Active response strategy is a potentially effective solution to mitigate the additional risks brought by the integration of PHEVs. This paper proposes a power system operation risk analysis framework in which charging load self-management is used to control system operation risk. We describe an interactive mechanism between the system and PHEVs in conjunction with a smart charging model is to simulate the time series power consumption of PHEVs. The charging load is managed with adjusting the state transition boundaries and without violating the users’ desired charging constraints. The load curtailment caused by voltage or power flow violation after outages is determined by controlling charging power. At the same time, the system risk is maintained under an acceptable level through charging load self-management. The proposed method is implemented using the Roy Billinton Test System (RBTS) and

  13. Impact of load management on the energy management strategy of a wind-short hydro hybrid system in frequency based pricing

    International Nuclear Information System (INIS)

    Malakar, T.; Goswami, S.K.; Sinha, A.K.

    2014-01-01

    Highlights: • This paper presents a new profit centric operating strategy of a hybrid power system under market environment. • The profit is ensured by optimal coordination of RES and load management approach. • The problem is formulated as dynamic optimization problem and solved using ABC algorithm. • Comparison shows that the proposed approach results more profit for the hybrid system. - Abstract: In the post restructuring era of electrical power system, each of the generating farm or utility has its own business strategy in terms of generation planning, load management and for other decisions. The basic objective of the utility is to maximize the operational profit for a given period of time. Generation scheduling for a utility with wind farm largely depends on the accuracy of wind power prediction. Therefore, it is important to explore the suitability of load management approach in coordination with the use of energy storage facility to compensate the uncertainty in wind power generation. This paper focuses mainly the operating strategy of a grid connected small hybrid power system to maximize its profit by adopting coordination between load management technique and utilization of storage plant under frequency based pricing. The optimum load scheduling has been implemented to utilities own local load. An hourly-discretized optimization algorithm is proposed and solved using artificial bee colony algorithm. To verify the effectiveness of the proposed method, the optimization problem is solved for varied wind power scenarios with different demand expectations cases in a day ahead Indian electricity market. It is noted that the proposed load management approach results more profit for the hybrid system because of better power management compared to the case when load scheduling has not been incorporated. The solution of the proposed optimization algorithm gives the strategies to be followed by the hybrid system how to operate its pump storage unit and to

  14. Managing an "Organistically-Oriented" School Intervention Program.

    Science.gov (United States)

    Barrilleaux, Louis E.; Schermerhorn, John R., Jr.

    An "organic" relationship between change agents and clients is a well-popularized goal in recent literature on planned change and organization development. There is, however, a dearth of literature on how to manage change programs under parameters set by this organic value. This paper examines one school organization development program for the…

  15. A Perspective on a Management Information Systems (MIS) Program Review

    Science.gov (United States)

    Yew, Bee K.

    2008-01-01

    This paper highlights relevant curriculum issues that were identified in a Management Information Systems (MIS) program review undertaken by a group of business faculty in a small regional university. The program review was initiated to improve job marketability of graduates and student enrollment. The review process is described as a collective…

  16. Resource values in analyzing fire management programs for economic efficiency

    Science.gov (United States)

    Irene A. Althaus; Thomas J. Mills

    1982-01-01

    In analyzing fire management programs for their economic efficiency, it is necessary to assign monetary values to the changes in resource outputs caused by, fire. The derivation of resource values is complicated by imperfect or nonexistent commercial market structures. The valuation concept recommended for fire program analyses is willingness-to-pay because it permits...

  17. Risk Management and Litigation Avoidance in Outdoor Recreation Programming.

    Science.gov (United States)

    Hanna, Glenda

    This paper reviews aspects of Canadian and U.S. law related to liability and negligence of outdoor programs and suggests strategies for risk management. To prove negligence, an individual injured in an outdoor program must prove that the outdoor leader had a duty of care to the participant, standards of care were breached, actual injury was…

  18. Strategic Human Resources Management of Employer Cooperative Education Programs.

    Science.gov (United States)

    Nielsen, Richard P.; Porter, Ralph C.

    1982-01-01

    This article discusses effective strategic planning and management of employer cooperative education programs. It examines types of planning, the need for such programs, and implementation strategies. Several case studies are considered: Dayton-Hudson, IBM, AT&T, Delta Airlines, and Rockwell International. (CT)

  19. An Evaluation of CHAMPS: A Classroom Management Program

    Science.gov (United States)

    Minnear, Holly J.

    2015-01-01

    This dissertation was designed to examine the impact of Conversation, Help, Activity, Movement, Participation, Success (CHAMPS), a classroom management program in elementary schools in a district in North Carolina. The participants included principals and teachers who attended a 2-day training course and implemented the CHAMPS program at their…

  20. Developing fire management mixes for fire program planning

    Science.gov (United States)

    Armando González-Cabán; Patricia B. Shinkle; Thomas J. Mills

    1986-01-01

    Evaluating economic efficiency of fire management program options requires information on the firefighting inputs, such as vehicles and crews, that would be needed to execute the program option selected. An algorithm was developed to translate automatically dollars allocated to type of firefighting inputs to numbers of units, using a set of weights for a specific fire...

  1. Directory of Instructional Programs in Supervision and Management Training.

    Science.gov (United States)

    Civil Service Commission, Washington, DC. Training Assistance Div.

    This directory, which is designed for the use of training officers in the Washington, D.C. area in prescribing learning programs to meet employee training needs, describes available group and self instructional programs used for the training of supervisors and managers. Each of the 21 courses listed contains the pertinent information necessary to…

  2. Core TuLiP - Logic Programming for Trust Management

    NARCIS (Netherlands)

    Czenko, M.R.; Etalle, Sandro; Dahl, V.; Niemelä, I.

    2007-01-01

    We propose CoreTuLiP - the core of a trust management language based on Logic Programming. CoreTuLiP is based on a subset of moded logic programming, but enjoys the features of TM languages such as RT; in particular clauses are issued by different authorities and stored in a distributed manner. We

  3. Outcomes Assessment in Accredited Health Information Management Programs

    Science.gov (United States)

    Bennett, Dorine

    2010-01-01

    The purpose of this study was to determine the use and perceived usefulness of outcomes assessment methods in health information management programs. Additional characteristics of the outcomes assessment practices were recognized. The findings were evaluated for significant differences in results based on age of the program, type of institution,…

  4. Sandia National Laboratories, California Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia

  5. Sandia National Laboratories, California Environmental Management System program manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has

  6. Sandia National Laboratories, California Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories

  7. Waste Management Program: Technical progress report, July-December 1985

    International Nuclear Information System (INIS)

    1987-12-01

    This report provides information on operations and development programs relating to the management of radioactive wastes at the Savannah River Plant. Information on environmental and safety assessments, waste form development, and process and equipment development are reported for long-term waste management. 13 refs., 20 figs., 16 tabs

  8. Small Business Management Volume III: Curriculum. An Adult Education Program.

    Science.gov (United States)

    Persons, Edgar A.; Swanson, Gordon I.

    The small business management adult education program outlined in this curriculum guide is designed to help small business entrepreneurs solve their business management problems and attain the goals they have established for their businesses and their families. (An instructor's manual and practice problems are in separate volumes.) The 3-year…

  9. Sustainable Supply Chain Management Programs in the 21st Century

    Science.gov (United States)

    Neureuther, Brian D.; O'Neill, Kevin

    2011-01-01

    One of the most difficult challenges for an undergraduate supply chain management program at smaller universities is to create an environment of sustainability. Supply chain management is not at the tip of tongue for many graduating high school students and few undergraduate curriculums require a course in the content area. This research addresses…

  10. Waste Management Program: Technical progress report, January-June 1985

    International Nuclear Information System (INIS)

    1987-12-01

    This report provides information on operations and development programs relating to the management of radioactive wastes at the Savannah River Plant. Information on environmental and safety assessments, waste form development, and process and equipment development are reported for long-term waste management. 35 refs., 12 figs., 8 tabs

  11. Public participation in UMTRA Project program management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it's been shown that an effective public participation program is an essential element to successful project implementation

  12. The Westinghouse Waste Isolation Division Management and Supervisor Training Program

    International Nuclear Information System (INIS)

    Gilbreath, B.

    1992-01-01

    The Westinghouse Waste Isolation Division (WID) is the management and operating contractor (MOC) for the Department of Energy's (DOE's) Waste Isolation Plant (WIPP). Managers and supervisors at DOE facilities such as the WIPP are required to complete extensive training. To meet this requirement, WID created a self-paced, self-study program known as Management and Supervisor Training (MAST). All WID managers and supervisors are required to earn certification through the MAST program. Selected employees are permitted to participate in MAST with prior approval from their manager and the Human Resources Manager. Initial MAST certification requires the completion of 31 modules. MAST participants check out modules and read them when convenient. When they are prepared, participants take module examinations. To receive credit for a given module, participants must score at least 80 percent on the examination. Lessons learned from the development, implementation, and administration are presented in this paper

  13. DOE reassesses civilian radioactive waste management program

    International Nuclear Information System (INIS)

    Yates, M.

    1990-01-01

    This article reports on the announcement by the Department of Energy (DOE) that the opening of a high-level radioactive nuclear waste repository site will be delayed for seven years. The article discusses DOE's reassessment plan, the restructuring of the Office of Civilian Radioactive Waste Management, site access and evaluation, the Monitored Retrievable Storage Commission proposal, and the industry's response

  14. Land Use Management for Solid Waste Programs

    Science.gov (United States)

    Brown, Sanford M., Jr.

    1974-01-01

    The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)

  15. School District Cash Management. Program Audit.

    Science.gov (United States)

    New York State Legislative Commission on Expenditure Review, Albany.

    New York State law permits school districts to invest cash not immediately needed for district operation and also specifies the kinds of investments that may be made in order to ensure the safety and liquidity of public funds. This audit examines cash management and investment practices in New York state's financially independent school districts.…

  16. French programs for advanced waste management options

    Energy Technology Data Exchange (ETDEWEB)

    Salvatores, M [CEA-DRN (France); Schapira, J P [CNRS-IN2P3 (France); Mouney, H [EDF-DE (France)

    1997-11-01

    Several organisms (CEA, CNRS, EdF, etc.) are cooperating in France on Accelerator-Driven Systems (ADS). The major motivation is the investigation of innovative options for the radioactive waste management. The paper describes the ongoing activities and future directions of this cooperative effort in the field of ADS. 11 refs, 3 figs.

  17. Disease Management, Case Management, Care Management, and Care Coordination: A Framework and a Brief Manual for Care Programs and Staff.

    Science.gov (United States)

    Ahmed, Osman I

    2016-01-01

    With the changing landscape of health care delivery in the United States since the passage of the Patient Protection and Affordable Care Act in 2010, health care organizations have struggled to keep pace with the evolving paradigm, particularly as it pertains to population health management. New nomenclature emerged to describe components of the new environment, and familiar words were put to use in an entirely different context. This article proposes a working framework for activities performed in case management, disease management, care management, and care coordination. The author offers standard working definitions for some of the most frequently used words in the health care industry with the goal of increasing consistency for their use, especially in the backdrop of the Centers for Medicaid & Medicare Services offering a "chronic case management fee" to primary care providers for managing the sickest, high-cost Medicare patients. Health care organizations performing case management, care management, disease management, and care coordination. Road map for consistency among users, in reporting, comparison, and for success of care management/coordination programs. This article offers a working framework for disease managers, case and care managers, and care coordinators. It suggests standard definitions to use for disease management, case management, care management, and care coordination. Moreover, the use of clear terminology will facilitate comparing, contrasting, and evaluating all care programs and increase consistency. The article can improve understanding of care program components and success factors, estimate program value and effectiveness, heighten awareness of consumer engagement tools, recognize current state and challenges for care programs, understand the role of health information technology solutions in care programs, and use information and knowledge gained to assess and improve care programs to design the "next generation" of programs.

  18. Status of the Canadian Nuclear Fuel Waste Management Program

    International Nuclear Information System (INIS)

    Lyon, R.B.

    1985-10-01

    The Canadian Nuclear Fuel Waste Management Program is in the fifth year of a ten-year generic research and development phase. The major objective of this phase of the program is to assess the basic safety and environmental aspects of the concept of isolating immobilized fuel waste by deep underground disposal in plutonic rock. The major scientific and engineering components of the program, namely immobilization studies, geoscience research, and environmental and safety assessment, are well established

  19. Management. Program CIP: Business Management: 52.0204

    Science.gov (United States)

    Murdock, Ashleigh Barbee, Ed.

    2008-01-01

    Secondary career-technical education programs in Mississippi are faced with many challenges resulting from sweeping educational reforms at the national and state levels. Schools and teachers are increasingly being held accountable for providing true learning activities to every student in the classroom. This accountability is measured through…

  20. 2008 Federal Energy Management Program (FEMP) Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  1. EPRI Guide to Managing Nuclear Utility Protective Clothing Programs

    International Nuclear Information System (INIS)

    Kelly, J.J.; Kelly, D.M.

    1993-10-01

    The Electric Power Research Institute (EPRI) commissioned a radioactive waste related project (RP2414-34) in 1989 to produce a guide for developing and managing nuclear plant protective clothing programs. Every nuclear facility must coordinate some type of protective clothing program for its radiation workers to ensure proper and safe protection for the wearer and to maintain control over the spread of contamination. Yet, every nuclear facility has developed its own unique program for managing such clothing. Accordingly, a need existed for a reference guide to assist with standardizing protective clothing programs and in controlling the potentially escalating economics of such programs. The initial Guide to Managing Nuclear Utility Protective Clothing Programs, NP-7309, was published in May 1991. Since that time, a number of utilities have reviewed and/or used the report to enhance their protective clothing programs. Some of these utilities requested that a computer program be developed to assist utilities in evaluating the economics of protective clothing programs consistent with the guidance in NP-7309. The PCEVAL computer code responds to that industry need. This report, the PCEVAL User's Manual, provides detailed instruction on use of the software

  2. Understanding Sediment Sources, Pathways, and Sinks in Regional Sediment Management: Application of Wash Load and Bed-Material Load Concept

    National Research Council Canada - National Science Library

    Biedenham, David S; Hubbard, Lisa C; Thome, Colin R; Watson, Chester C

    2006-01-01

    ... through the fluvial system for sediments derived from various bed, bank, gully, and catchment sources thereby providing a reliable analytical foundation for effective regional sediment management...

  3. 78 FR 25678 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-02

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Gwendolyn Gleaton, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA...

  4. Waste Management Program. Technical progress report, July-December, 1984

    International Nuclear Information System (INIS)

    1986-10-01

    This report provides information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, other support, in situ storage or disposal, waste form development and characterization, process and equipment development, and the Defense Waste Processing Facility are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations: tank farm operation, inspection program, burial ground operations, and waste transfer/tank replacement

  5. Waste Management Program. Technical progress report, Aporil-June 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-02-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  6. First German disease management program for breast cancer.

    Science.gov (United States)

    Rupprecht, Christoph

    2005-01-01

    The first disease management program contract for breast cancer in Germany was signed in 2002 between the Association of Regional of Physicians in North-Rhine and the statutory health insurance companies in Rhineland. At the heart of this unique breast cancer disease management program is a patient-centered network of health care professionals. The program's main objectives are: (1) to improve the quality of treatment and post-operative care for breast cancer patients, (2) to provide timely information and consultation empowering the patient to participate in decisionmaking, (3) to improve the interface between inpatient and outpatient care, and (4) to increase the number of breast-conserving surgeries.

  7. Benchmarking processes for managing large international space programs

    Science.gov (United States)

    Mandell, Humboldt C., Jr.; Duke, Michael B.

    1993-01-01

    The relationship between management style and program costs is analyzed to determine the feasibility of financing large international space missions. The incorporation of management systems is considered to be essential to realizing low cost spacecraft and planetary surface systems. Several companies ranging from large Lockheed 'Skunk Works' to small companies including Space Industries, Inc., Rocket Research Corp., and Orbital Sciences Corp. were studied. It is concluded that to lower the prices, the ways in which spacecraft and hardware are developed must be changed. Benchmarking of successful low cost space programs has revealed a number of prescriptive rules for low cost managements, including major changes in the relationships between the public and private sectors.

  8. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Dormuth, K.W.; Nuttall, K.

    1987-01-01

    Canada has established an extensive research program to develop and demonstrate the technology for safely disposing of nuclear fuel waste from Canadian nuclear electric generating stations. The program focuses on the concept of disposal deep in plutonic rock, which is abundant in the province of Ontario, Canada's major producer of nuclear electricity. Research is carried out at field research areas in the Canadian Precambrian Shield, and in government and university laboratories. The schedule calls for a document assessing the disposal concept to be submitted to regulatory and environmental agencies in late 1988. This document will form the basis for a review of the concept by these agencies and by the public. No site selection will be carried out before this review is completed. 10 refs.; 2 figs

  9. Integrating Cybersecurity into the Program Management Organization

    Science.gov (United States)

    2015-05-13

    penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 13 MAY 2015 2...Threat to our National Economy DOD Cybersecurity Gaps Could Be Canary in Federal Acquisition Coal Mine Intangible Assets Create Vulnerabilities...operational approach integrates with current or planned CONOPS, BCP, information architecture, programs or initiatives Development  Approach to

  10. Status of ageing management program for HANARO

    International Nuclear Information System (INIS)

    Kim, Sang-Jin; Shin, Jin-Won; Kim, Hyung-Kyoo; Jung, Hoan-Sung

    2012-01-01

    HANARO is a 30 MW open pool type research reactor which has been operated for 16 years since its initial criticality in February 1995. It has been used for nuclear material testing, radioisotope production, neutron transmutation doping, nuclear activation analysis, and neutron scattering experiments. Recently, new facilities such as FTL (Fuel Transfer Loop) and CNS (Cold Neutron Source) were installed in the reactor. HANARO was originally designed to operate for at least 20 years under full power operating condition, but the actual life time is expected to be much more than the design lifetime by supporting with a safety reassessment based on realistic data and maintenance activities for an ageing management. The conducted inspections, maintenance activities, and the future plan of the ageing management for HANARO are presented in this paper. (author)

  11. Asset liability management using stochastic programming

    OpenAIRE

    Pirbhai, M; Mitra, G; Kyriakis, T

    2003-01-01

    This chapter sets out to explain an important financial planning model called asset liability management (ALM); in particular, it discusses why in practice, optimum planning models are used. The ability to build an integrated approach that combines liability models with that of asset allocation decisions has proved to be desirable and more efficient in that it can lead to better ALM decisions. The role of uncertainty and quantification of risk in these planning models is con...

  12. Buildings energy management program workshop design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-12-01

    This document describes activities undertaken by Honeywell's Energy Resources Center for design and development of the format, content, and materials that were used in conducting 129 one-day energy management workshops for specific commercial business audiences. The Building Energy Management Workshop Program was part of a National Workshop Program that was intended to increase awareness of energy-related issues and to encourage energy-conservation actions on the part of commercial and industrial sectors. The total effort included executive conferences for chief executive officers and other senior management personnel; industrial energy-conservation workshops directed at plant management and engineering personnel; vanpooling workshops designed to inform and encourage business in implementing a vanpooling program for employees; and the building energy-management workshops specifically developed for managers, owners, and operators of office and retail facilities, restaurants, and supermarkets. The total program spanned nearly two years and reached approximately 2,500 participants from all parts of the U.S. A detailed followup evaluation is still being conducted to determine the impact of this program in terms of conservation action undertaken by workshop participants.

  13. Proof load testing of reinforced concrete bridges: Experience from a program of testing in the Netherlands

    NARCIS (Netherlands)

    Lantsoght, E.O.L.

    2017-01-01

    For existing bridges with large uncertainties, analytical methods have limitations. Therefore, to reduce these uncertainties, field testing of a bridge can be used. A type of such a field test is a proof load test, in which a load equivalent to the factored live load is applied. If the bridge can

  14. Practical examples of how knowledge management is addressed in Point Lepreau heat transport ageing management programs

    International Nuclear Information System (INIS)

    Slade, J.; Gendron, T.; Greenlaw, G.

    2009-01-01

    In the mid-1990s, New Brunswick Power Nuclear implemented a Management System Process Model at the Point Lepreau Generating Station that provides the basic elements of a knowledge management program. As noted by the IAEA, the challenge facing the nuclear industry now is to make improvements in knowledge management in areas that are more difficult to implement. Two of these areas are: increasing the value of existing knowledge, and converting tacit knowledge to explicit knowledge (knowledge acquisition). This paper describes some practical examples of knowledge management improvements in the Point Lepreau heat transport system ageing management program. (author)

  15. EPRI'S low-level waste management R ampersand D program

    International Nuclear Information System (INIS)

    Hornibrook, C.

    1997-01-01

    The immediate challenges facing every organization today are to improve its productivity and increase customer satisfaction. The Electric Power Research Institute (EPRI) responded to this challenge by broadening the scope of its low-level waste (LLW) management program. EPRI offered utilities on-site assistance in evaluating and optimizing their liquid- and solid-waste management programs. The goal is to identify open-quotes cheaper, better, and easierclose quotes solutions, which are documented in a series of reports. These provide step-by-step evaluation processes and straightforward implementation methods. Utility professionals are provided with the necessary technical information and justification for informed waste management decisions. The resulting average annual savings is consistently in excess of $700,000 per facility. The program continues to grow and serves as a model for a number of existing and emerging EPRI programs

  16. Measurement errors in network load measurement: Effects on lead management and accounting. Messfehler bei der Netzlasterfassung: Einfluss auf Lastregelung und Leistungsverrechnung

    Energy Technology Data Exchange (ETDEWEB)

    Bunten, B. (Teilbereich Lastfuehrung, ABB Netzleittechnik GmbH, Ladenburg (Germany)); Dib, R.N. (Fachhochschule Giessen-Friedberg, Bereich Elektrische Energietechnik, Friedberg (Germany))

    1994-05-16

    In electric power supply systems continuous power measurement in the delivery points is necessary both for the purpose of load-management and for energy and power accounting. Electricity meters with pulse output points are commonly used for both applications today. The authors quantify the resulting errors in peak load measurement and load management as a function of the main influencing factors. (orig.)

  17. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Science.gov (United States)

    2010-04-01

    ... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge... 25 Indians 1 2010-04-01 2010-04-01 false Are management systems required for the IRR Program? 170... Program Reviews and Management Systems § 170.502 Are management systems required for the IRR Program? (a...

  18. Contextual Intelligent Load Management Considering Real Time Pricing in a Smart Grid Environment

    DEFF Research Database (Denmark)

    Gomes, Luis; Fernandes, Filipe; Faria, Pedro

    2013-01-01

    The use of demand response programs enables the adequate use of resources of small and medium players, bringing high benefits to the smart grid, and increasing its efficiency. One of the difficulties to proceed with this paradigm is the lack of intelligence in the management of small and medium...... size players. In order to make demand response programs a feasible solution, it is essential that small and medium players have an efficient energy management and a fair optimization mechanism to decrease the consumption without heavy loss of comfort, making it acceptable for the users. This paper...... addresses the application of real-time pricing in a house that uses an intelligent optimization module involving artificial neural networks....

  19. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites

  20. Commentary on the Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Sheng, G.; Shemilt, L.W.

    1981-01-01

    A summary of the first formal review of the Technical Advisory Committee (TAC) to Atomic Energy of Canada Limited on the Nuclear Fuel Waste Management Program is presented. The Program is described briefly and the composition and role of TAC in relation to the Program is outlined. Salient points and major recommendations are presented from the First Annual Report of TAC in which geoscience aspects of the Program were emphasized. It is the view of the Committee that overall, the whole Waste Management Program is well conceived, that there are many impressive accomplishments of high quality, that detailed research objectives are becoming more clearly delineated, that there is growing clarification as to the most critical areas in which research needs to be accomplished and that the increasing participation by university and industry scientists and engineers is reassuring

  1. [The German program for disease management guidelines. Results and perspectives].

    Science.gov (United States)

    Ollenschläger, Günter; Kopp, Ina

    2007-05-15

    The Program for National Disease Management Guidelines (German DM-CPG Program) is a joint initiative of the German Medical Association (umbrella organization of the German Chambers of Physicians), the Association of the Scientific Medical Societies (AWMF), and of the National Association of Statutory Health Insurance Physicians (NASHIP). The program aims at developing, implementing and continuously updating best-practice recommendations for countrywide and regional disease management programs in Germany. Since 2003 twelve national guidelines (topics: asthma, chronic obstructive pulmonary disease, HI (Chronic heart failure), CVD (Chronic coronary heart disease) back pain, depression, several aspects of diabetes) have been produced by use of a standardized procedure in accordance with internationally consented methodologies. For countrywide dissemination and implementation the program uses a wide range of specialist journals, continuous medical education and quality management programs. So far, 36 out of 150 national scientific medical associations, four allied health profession organizations, and twelve national consumer organizations have been participating in the DM-CPG Program. Studies to evaluate the program's effects on health-care providers' behavior and patients' outcomes are under way.

  2. Management program on radioactive wastes in research

    International Nuclear Information System (INIS)

    Xavier, Ana Maria; Wieland, Patricia; Heilbron Filho, Paulo Fernando L.; Ferreira, Rubemar de Souza

    1998-01-01

    This document has the objective to orient and advise the researchers to practice a safety management of radioactive wastes in each research laboratory, based upon the technical norms of the Brazilian Nuclear Energy Commission and the recommendations of the International Atomic Energy Agency. Additionally, basic information on the main radioisotopes used in research are presented, including the processes used for production of radioisotopes, methods for radiation detection, range of alpha and beta particles, background radiation, as well as principles on radioprotection and biological effects of radiation

  3. Risk Management Program Application for the Component Test Capability

    International Nuclear Information System (INIS)

    Stephanie L. Austad; Jeffrey D. Bryan

    2009-01-01

    This paper documents the application of the risk management program requirements to Component Test Capability (CTC) Project activities for each CTC alternative. In particular, DOE O 413.3A, 'Program and Project Management for the Acquisition of Capital Assets,' and DOE G 413.3-7, 'Risk Management Guide for Project Management,' will apply in the event that Alternative 4, Single, Standalone Component Test Facility (CTF), is selected and approved. As such, it is advisable to begin planning to meet the associated Department of Energy (DOE) requirements and guidance as early in the acquisition process as practicable. This white paper is intended to assist in this planning and to support associated decision-making activities. Nontechnical risks associated with each alternative will be identified to support the Next Generation Nuclear Plant (NGNP) CTC alternatives analysis. Technical risks are assumed to be addressed through the Technology Development Risk Management modeling process and are inherent to the alternatives

  4. Quality programs for waste management research and development

    International Nuclear Information System (INIS)

    Hood, F.C.

    1990-06-01

    The Pacific Northwest Laboratory (PNL) is a US Department of Energy (DOE) multi-program national laboratory. PNL develops waste management processes and techniques as well as providing management services for characterization and remediation of radioactive and/or hazardous waste sites for the DOE. This paper deals with the application of total quality management principles to waste management research and development activities at PNL. The PNL Quality Program has evolved with expanding expectations for ''error-free'' performance from the client and the public sector; it describes the management controls needed to achieve desired levels of product quality and to verify they are reached. It includes the definition of work requirements, performance objectives, roles and responsibilities, performance indicators and measurement, performance feedback mechanisms, and process improvement methodologies. 6 refs

  5. BNFL nuclear decommissioning liabilities management program

    International Nuclear Information System (INIS)

    Colquhoun, A.P.

    1995-01-01

    The objective of this paper is to describe BNFL's policy and strategy for decommissioning and also to summarize the overall scope of nuclear liabilities in the wider field of waste retrieval and storage, as well as the dismantling and demolition aspects of decommissioning. BNFL's recently established organisational arrangements for discharging all types of these liabilities are explained, together with a review of practical progress in dealing with them. Organisational changes in recent years have amalgamated decommissioning work with operations covering waste storage and retrieval operations. A strategy of minimising residual activity in shutdown plants is pursued, followed by dismantling and demolition on appropriate time scales to minimise risk and cost. Since April 1995, a new BNFL subsidiary, Nuclear Liabilities Management Company Limited has taken responsibility for discharge of BNFL's Waste Retrieval and Decommissioning liabilities on all BNFL sites. NLM has the objectives of optimal and lowest cost management of liabilities and much clearer segregation of physical operations from project specification and planning. The Ministry of Defense (MoD) policy, strategy, work programmes and progress for the Atomic Weapons Establishment (AWE) are also outlined. MoD/AEA has established an equivalent strategy for dealing with its liabilities. (J.S.). 5 refs., 2 figs., 4 appends

  6. Site Specific Waste Management Instructions for loading and shipment of category 3 investigation derived waste to ERDF

    International Nuclear Information System (INIS)

    Corriveau, C.E.; Wolf, D.M.

    1996-08-01

    This Site Specific Waste Management Instruction (SSWMI) provides guidance for management of containerized investigation-derived waste being loaded and transported to the Environmental Restoration Disposal Facility. The SSWMI outlines the waste management practices that will be performed in the field to implement federal, state, and US Department of Energy requirements. Additional guidance for waste packaging, marking, labeling and shipping is provided (US DOT rules in 49 CFR have precedence)

  7. Building effective cybersecurity programs a security manager's handbook

    CERN Document Server

    Schreider, Tari

    2017-01-01

    You know by now that your company could not survive without the Internet. Not in today's market. You are either part of the digital economy or reliant upon it. With critical information assets at risk, your company requires a state-of-the-art cybersecurity program. But how do you achieve the best possible program? Tari Schreider, in Building Effective Cybersecurity Programs: A Security Manager's Handbook, lays out the step-by-step roadmap to follow as you build or enhance your cybersecurity program.

  8. Workplace disability management programs promoting return-to-work

    DEFF Research Database (Denmark)

    Gensby, Ulrik; Lund, Thomas; Kowalski, Krystyna

    This report presents a Campbell systematic review on the effectiveness of workplace disability management programs (WPDM programs) promoting return to work (RTW), as implemented and practised by employers. The objectives of this review were to assess the effects of WPDM programs, to examine...... non-randomized studies (NRS) and eleven single group ‘before and after’ studies (B & A)), including data from eleven different WPDM programs, met the inclusion criteria. There were insufficient data on the characteristics of the sample and the effect sizes were uncertain. There is a lack of evidence...

  9. Program Management Approach to the Territorial Development of Small Business

    Directory of Open Access Journals (Sweden)

    Natalia Aleksandrovna Knysh

    2016-06-01

    Full Text Available This article presents the results of the research of the application on a state level of the program management approach to the territorial development of small business. Studying the main mechanism of the state policy implementation in the sphere of small business on a regional level, the authors have revealed the necessity to take into account the territorial specificity while the government programs of small business development are being formed. The analysis of the national practice of utilizing the program management mechanism in the regional system of the government support of small entrepreneurship was conducted on the example of Omsk region. The results of the analysis have shown the inefficiency of the current support system for small business and have determined the need to create an integrated model of territorial programming, which would not only contribute to the qualitative development of small business, but also provide the functioning efficiency of program management mechanism. As a result, the authors have created the two-level model of the programming of the territorial development of small business, which allows to satisfy purposefully the needs of entrepreneurship taking into account the specificity of the internal and external environment of the region. The first level of the model is methodological one and it is based on the marketing approach (the concepts of place marketing and relationship marketing to the operation of the program management mechanism. The second level of the model is methodical one. It offers the combination of the flexible methods of management of programming procedure (benchmarking, foresight, crowdsourcing and outsourcing. The given model raises the efficiency of the management decisions of the state structures in the sphere of small business. Therefore, it is interesting for the government authorities, which are responsible for the regional and municipal support programs of small business, as well

  10. CAL--ERDA program manual. [Building Design Language; LOADS, SYSTEMS, PLANT, ECONOMICS, REPORT, EXECUTIVE, CAL-ERDA

    Energy Technology Data Exchange (ETDEWEB)

    Hunn, B. D.; Diamond, S. C.; Bennett, G. A.; Tucker, E. F.; Roschke, M. A.

    1977-10-01

    A set of computer programs, called Cal-ERDA, is described that is capable of rapid and detailed analysis of energy consumption in buildings. A new user-oriented input language, named the Building Design Language (BDL), has been written to allow simplified manipulation of the many variables used to describe a building and its operation. This manual provides the user with information necessary to understand in detail the Cal-ERDA set of computer programs. The new computer programs described include: an EXECUTIVE Processor to create computer system control commands; a BDL Processor to analyze input instructions, execute computer system control commands, perform assignments and data retrieval, and control the operation of the LOADS, SYSTEMS, PLANT, ECONOMICS, and REPORT programs; a LOADS analysis program that calculates peak (design) zone and hourly loads and the effect of the ambient weather conditions, the internal occupancy, lighting, and equipment within the building, as well as variations in the size, location, orientation, construction, walls, roofs, floors, fenestrations, attachments (awnings, balconies), and shape of a building; a Heating, Ventilating, and Air-Conditioning (HVAC) SYSTEMS analysis program capable of modeling the operation of HVAC components including fans, coils, economizers, humidifiers, etc.; 16 standard configurations and operated according to various temperature and humidity control schedules. A plant equipment program models the operation of boilers, chillers, electrical generation equipment (diesel or turbines), heat storage apparatus (chilled or heated water), and solar heating and/or cooling systems. An ECONOMIC analysis program calculates life-cycle costs. A REPORT program produces tables of user-selected variables and arranges them according to user-specified formats. A set of WEATHER ANALYSIS programs manipulates, summarizes and plots weather data. Libraries of weather data, schedule data, and building data were prepared.

  11. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  12. Multi-Drug-Loaded Microcapsules with Controlled Release for Management of Parkinson's Disease.

    Science.gov (United States)

    Baek, Jong-Suep; Choo, Chee Chong; Qian, Cheng; Tan, Nguan Soon; Shen, Zexiang; Loo, Say Chye Joachim

    2016-07-01

    Parkinson's disease (PD) is a progressive disease of the nervous system, and is currently managed through commercial tablets that do not sufficiently enable controlled, sustained release capabilities. It is hypothesized that a drug delivery system that provides controlled and sustained release of PD drugs would afford better management of PD. Hollow microcapsules composed of poly-l-lactide (PLLA) and poly (caprolactone) (PCL) are prepared through a modified double-emulsion technique. They are loaded with three PD drugs, i.e., levodopa (LD), carbidopa (CD), and entacapone (ENT), at a ratio of 4:1:8, similar to commercial PD tablets. LD and CD are localized in both the hollow cavity and PLLA/PCL shell, while ENT is localized in the PLLA/PCL shell. Release kinetics of hydrophobic ENT is observed to be relatively slow as compared to the other hydrophilic drugs. It is further hypothesized that encapsulating ENT into PCL as a surface coating onto these microcapsules can aid in accelerating its release. Now, these spray-coated hollow microcapsules exhibit similar release kinetics, according to Higuchi's rate, for all three drugs. The results suggest that multiple drug encapsulation of LD, CD, and ENT in gastric floating microcapsules could be further developed for in vivo evaluation for the management of PD. © 2016 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  13. Chassis loading investigation of two-shaft shredder for construction waste management

    Directory of Open Access Journals (Sweden)

    Vatskicheva Malina

    2017-01-01

    Full Text Available Recycling industry development need cracked materials with different composition and characteristics. New constructions shredders creation, their engineering design, development through adequate mechanical-mathematical models and practical realization determines the actuality of this paper. The materials crushing for recycling solves important environmental tasks related to environmental protection. The two-shaft hydraulic shredder realized the first and the second stage from the crushing (disintegration process. Disintegration as part of the recycling process can be successfully applied to the domestic and industrial waste processing, singleand multi-component materials crushing, and to secondary raw materials grinding. The paper is dedicated to the emerging loading of the two-shaft shredder chassis and the resulting calculations and verifications. In the present work has been performed a modeling study of the chassis for such type of shredder for concrete, rubber, plastic and wood crushing. The studies of the mechanical load and behaviour of the chassis have been conducted. The equations characterizing the mechanical processes in the working conditions by the finite element method are solved. For this purpose has been generated a chassis three-dimensional geometrical model, which has been discretized to a planned network of finite elements in the ANSYS MECHANICAL APDL programming environment.

  14. Comparison between dynamic programming and genetic algorithm for hydro unit economic load dispatch

    Directory of Open Access Journals (Sweden)

    Bin Xu

    2014-10-01

    Full Text Available The hydro unit economic load dispatch (ELD is of great importance in energy conservation and emission reduction. Dynamic programming (DP and genetic algorithm (GA are two representative algorithms for solving ELD problems. The goal of this study was to examine the performance of DP and GA while they were applied to ELD. We established numerical experiments to conduct performance comparisons between DP and GA with two given schemes. The schemes included comparing the CPU time of the algorithms when they had the same solution quality, and comparing the solution quality when they had the same CPU time. The numerical experiments were applied to the Three Gorges Reservoir in China, which is equipped with 26 hydro generation units. We found the relation between the performance of algorithms and the number of units through experiments. Results show that GA is adept at searching for optimal solutions in low-dimensional cases. In some cases, such as with a number of units of less than 10, GA's performance is superior to that of a coarse-grid DP. However, GA loses its superiority in high-dimensional cases. DP is powerful in obtaining stable and high-quality solutions. Its performance can be maintained even while searching over a large solution space. Nevertheless, due to its exhaustive enumerating nature, it costs excess time in low-dimensional cases.

  15. ERDA's long-term waste management goals and programs

    International Nuclear Information System (INIS)

    Perge, A.F.; Trice, V.G. Jr.; Walton, R.D. Jr.

    1976-01-01

    This paper presents an overview of the ERDA's major program for the long-term waste management of radioactive waste and provides a perspective for symposium participants with regard to the interrelationship of specific components of the program that are discussed in detail in other ERDA-sponsored papers. Needs, goals, and plans are reviewed for ERDA's management of the commercially generated wastes which are expected to be delivered to ERDA in accordance with Federal regulations. At present, ERDA responsibilities include long-term management of commercial-level wastes. Possible future regulations may give ERDA responsibility for the long-term management of commercial low-level solid wastes contaminated with transuranic nuclides. Primary planning goals and programs for the development of terminal storage facilities and waste processing technology to produce acceptable waste forms for long-term management are reviewed for each of the waste types identified above. The status of development programs for the long-term management of airborne radionuclides, which may be required at some time in the future, is also reviewed. (author)

  16. Event-based scenario manager for multibody dynamics simulation of heavy load lifting operations in shipyards

    Directory of Open Access Journals (Sweden)

    Sol Ha

    2016-01-01

    Full Text Available This paper suggests an event-based scenario manager capable of creating and editing a scenario for shipbuilding process simulation based on multibody dynamics. To configure various situation in shipyards and easily connect with multibody dynamics, the proposed method has two main concepts: an Actor and an Action List. The Actor represents the anatomic unit of action in the multibody dynamics and can be connected to a specific component of the dynamics kernel such as the body and joint. The user can make a scenario up by combining the actors. The Action List contains information for arranging and executing the actors. Since the shipbuilding process is a kind of event-based sequence, all simulation models were configured using Discrete EVent System Specification (DEVS formalism. The proposed method was applied to simulations of various operations in shipyards such as lifting and erection of a block and heavy load lifting operation using multiple cranes.

  17. Demonstration project: Load management on the user side at power shortages

    International Nuclear Information System (INIS)

    Lindskoug, Stefan

    2005-10-01

    The risk for power shortages during extreme cold weather has increased in Sweden. Comments are made that high electricity spot prices are important for holding down the demand. Through the consumers' higher price sensitivity, the electricity system can be operated with lower reserve capacity. The objective of the demonstration project is to show methods for reducing the electricity demand at the national level at high spot prices. An important prerequisite is that the measures must be profitable for all parties involved. Four separate studies were made, two concerning households, one industry and one for the district heating sector. The conclusion from the studies is that load management on the customer's side is an economic alternative to investment in new production capacity

  18. Mud, models, and managers: Reaching consensus on a watershed strategy for sediment load reduction

    Science.gov (United States)

    Wilcock, P. R.; Cho, S. J.; Gran, K.; Belmont, P.; Hobbs, B. F.; Heitkamp, B.; Marr, J. D.

    2017-12-01

    Agricultural nonpoint source sediment pollution is a leading cause of impairment of U.S. waters. Sediment sources are often on private land, such that solutions require not only considerable investment, but broad acceptance among landowners. We present the story of a participatory modeling exercise whose goal was to develop a consensus strategy for reducing sediment loading from the Greater Blue Earth River Basin, a large (9,200 km2) watershed in southern Minnesota dominated by row crop agriculture. The Collaborative for Sediment Source Reduction was a stakeholder group of farmers, industry representatives, conservation groups, and regulatory agencies. We used a participatory modeling approach to promote understanding of the problem, to define the scope of solutions acceptable to farmers, to develop confidence in a watershed model, and to reach consensus on a watershed strategy. We found that no existing watershed model could provide a reliable estimate of sediment response to management actions and developed a purpose-built model that could provide reliable, transparent, and fast answers. Because increased stream flow was identified as an important driver of sediment loading, the model and solutions included both hydrologic and sediment transport components. The model was based on an annual sediment budget with management actions serving to proportionally reduce both sediment sources and sediment delivery. Importantly, the model was developed in collaboration with stakeholders, such that a shared understanding emerged regarding of the modeling challenges and the reliability of information used to strongly constrain model output. The simplicity of the modeling approach supported stakeholder engagement and understanding, thereby lowering the social barrier between expert modeler and concerned stakeholder. The consensus strategy focused on water storage higher in the watershed in order to reduce river discharge and the large supply of sediment from near

  19. Energy management of a university campus utilizing short-term load forecasting with an artificial neural network

    Science.gov (United States)

    Palchak, David

    Electrical load forecasting is a tool that has been utilized by distribution designers and operators as a means for resource planning and generation dispatch. The techniques employed in these predictions are proving useful in the growing market of consumer, or end-user, participation in electrical energy consumption. These predictions are based on exogenous variables, such as weather, and time variables, such as day of week and time of day as well as prior energy consumption patterns. The participation of the end-user is a cornerstone of the Smart Grid initiative presented in the Energy Independence and Security Act of 2007, and is being made possible by the emergence of enabling technologies such as advanced metering infrastructure. The optimal application of the data provided by an advanced metering infrastructure is the primary motivation for the work done in this thesis. The methodology for using this data in an energy management scheme that utilizes a short-term load forecast is presented. The objective of this research is to quantify opportunities for a range of energy management and operation cost savings of a university campus through the use of a forecasted daily electrical load profile. The proposed algorithm for short-term load forecasting is optimized for Colorado State University's main campus, and utilizes an artificial neural network that accepts weather and time variables as inputs. The performance of the predicted daily electrical load is evaluated using a number of error measurements that seek to quantify the best application of the forecast. The energy management presented utilizes historical electrical load data from the local service provider to optimize the time of day that electrical loads are being managed. Finally, the utilization of forecasts in the presented energy management scenario is evaluated based on cost and energy savings.

  20. Management characteristics of successful public health programs: "Avahan" HIV prevention program in India.

    Science.gov (United States)

    Mabuchi, Shunsuke; Singh, Suneeta; Bishnu, Rituparna; Bennett, Sara

    2013-01-01

    This paper analyzes Avahan, an HIV prevention program in India, that achieved very rapid scale-up. The paper aims to (i) define the distinctive features of the management of Avahan, (ii) examine how the distinctive features relate to key constructs in management frameworks and (iii) investigate how the management approaches of Avahan contributed to the program's ability to scale-up rapidly while maintaining service quality. The Delphi method was used to identify the distinctive features of Avahan. Through three rounds of questions, 38 participants closely associated with Avahan were asked to identify and develop consensus on its distinctive features. These features were then mapped against the Baldrige Health Care Criteria for Performance Excellence to investigate how they related to important dimensions of management. A total of 17 distinctive features of Avahan were identified. These distinctive features emphasized the importance of data use and performance monitoring at all levels, especially combined with a flexible management style that facilitated local responsiveness to community, innovation and learning. The distinctive features comprehensively addressed the criteria for management excellence in the Baldridge framework. In the case of Avahan, the rigorous application of known management techniques to public health programs appears to have been an important factor in the successful scale-up of the program. Also, the Baldrige criteria seem applicable to health programs in low-income and middle-income countries; further applications would help test their robustness and utility in such contexts. Copyright © 2012 John Wiley & Sons, Ltd.