WorldWideScience

Sample records for llnl contract work

  1. Summary of Environmental Data Analysis and Work Performed by Lawrence Livermore National Laboratory (LLNL) in Support of the Navajo Nation Abandoned Mine Lands Project at Tse Tah, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    Taffet, Michael J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Esser, Bradley K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Madrid, Victor M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-05-17

    This report summarizes work performed by Lawrence Livermore National Laboratory (LLNL) under Navajo Nation Services Contract CO9729 in support of the Navajo Abandoned Mine Lands Reclamation Program (NAMLRP). Due to restrictions on access to uranium mine waste sites at Tse Tah, Arizona that developed during the term of the contract, not all of the work scope could be performed. LLNL was able to interpret environmental monitoring data provided by NAMLRP. Summaries of these data evaluation activities are provided in this report. Additionally, during the contract period, LLNL provided technical guidance, instructional meetings, and review of relevant work performed by NAMLRP and its contractors that was not contained in the contract work scope.

  2. LLNL Center of Excellence Work Items for Q9-Q10 period

    Energy Technology Data Exchange (ETDEWEB)

    Neely, J. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-02

    This work plan encompasses a slice of effort going on within the ASC program, and for projects utilizing COE vendor resources, describes work that will be performed by both LLNL staff and COE vendor staff collaboratively.

  3. Review of LLNL Mixed Waste Streams for the Application of Potential Waste Reduction Controls

    International Nuclear Information System (INIS)

    Belue, A; Fischer, R P

    2007-01-01

    In July 2004, LLNL adopted the International Standard ISO 14001 as a Work Smart Standard in lieu of DOE Order 450.1. In support of this new requirement the Director issued a new environmental policy that was documented in Section 3.0 of Document 1.2, ''ES and H Policies of LLNL'', in the ES and H Manual. In recent years the Environmental Management System (EMS) process has become formalized as LLNL adopted ISO 14001 as part of the contract under which the laboratory is operated for the Department of Energy (DOE). On May 9, 2005, LLNL revised its Integrated Safety Management System Description to enhance existing environmental requirements to meet ISO 14001. Effective October 1, 2005, each new project or activity is required to be evaluated from an environmental aspect, particularly if a potential exists for significant environmental impacts. Authorizing organizations are required to consider the management of all environmental aspects, the applicable regulatory requirements, and reasonable actions that can be taken to reduce negative environmental impacts. During 2006, LLNL has worked to implement the corrective actions addressing the deficiencies identified in the DOE/LSO audit. LLNL has begun to update the present EMS to meet the requirements of ISO 14001:2004. The EMS commits LLNL--and each employee--to responsible stewardship of all the environmental resources in our care. The generation of mixed radioactive waste was identified as a significant environmental aspect. Mixed waste for the purposes of this report is defined as waste materials containing both hazardous chemical and radioactive constituents. Significant environmental aspects require that an Environmental Management Plan (EMP) be developed. The objective of the EMP developed for mixed waste (EMP-005) is to evaluate options for reducing the amount of mixed waste generated. This document presents the findings of the evaluation of mixed waste generated at LLNL and a proposed plan for reduction

  4. 2016 LLNL Nuclear Forensics Summer Program

    Energy Technology Data Exchange (ETDEWEB)

    Zavarin, Mavrik [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-11-15

    The Lawrence Livermore National Laboratory (LLNL) Nuclear Forensics Summer Program is designed to give graduate students an opportunity to come to LLNL for 8–10 weeks for a hands-on research experience. Students conduct research under the supervision of a staff scientist, attend a weekly lecture series, interact with other students, and present their work in poster format at the end of the program. Students also have the opportunity to meet staff scientists one-on-one, participate in LLNL facility tours (e.g., the National Ignition Facility and Center for Accelerator Mass Spectrometry), and gain a better understanding of the various science programs at LLNL.

  5. 2016 LLNL Nuclear Forensics Summer Program

    International Nuclear Information System (INIS)

    Zavarin, Mavrik

    2016-01-01

    The Lawrence Livermore National Laboratory (LLNL) Nuclear Forensics Summer Program is designed to give graduate students an opportunity to come to LLNL for 8-10 weeks for a hands-on research experience. Students conduct research under the supervision of a staff scientist, attend a weekly lecture series, interact with other students, and present their work in poster format at the end of the program. Students also have the opportunity to meet staff scientists one-on-one, participate in LLNL facility tours (e.g., the National Ignition Facility and Center for Accelerator Mass Spectrometry), and gain a better understanding of the various science programs at LLNL.

  6. 2017 LLNL Nuclear Forensics Summer Internship Program

    Energy Technology Data Exchange (ETDEWEB)

    Zavarin, Mavrik [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-12-13

    The Lawrence Livermore National Laboratory (LLNL) Nuclear Forensics Summer Internship Program (NFSIP) is designed to give graduate students an opportunity to come to LLNL for 8-10 weeks of hands-on research. Students conduct research under the supervision of a staff scientist, attend a weekly lecture series, interact with other students, and present their work in poster format at the end of the program. Students can also meet staff scientists one-on-one, participate in LLNL facility tours (e.g., the National Ignition Facility and Center for Accelerator Mass Spectrometry), and gain a better understanding of the various science programs at LLNL.

  7. GAMA-LLNL Alpine Basin Special Study: Scope of Work

    Energy Technology Data Exchange (ETDEWEB)

    Singleton, M J; Visser, A; Esser, B K; Moran, J E

    2011-12-12

    For this task LLNL will examine the vulnerability of drinking water supplies in foothills and higher elevation areas to climate change impacts on recharge. Recharge locations and vulnerability will be determined through examination of groundwater ages and noble gas recharge temperatures in high elevation basins. LLNL will determine whether short residence times are common in one or more subalpine basin. LLNL will measure groundwater ages, recharge temperatures, hydrogen and oxygen isotopes, major anions and carbon isotope compositions on up to 60 samples from monitoring wells and production wells in these basins. In addition, a small number of carbon isotope analyses will be performed on surface water samples. The deliverable for this task will be a technical report that provides the measured data and an interpretation of the data from one or more subalpine basins. Data interpretation will: (1) Consider climate change impacts to recharge and its impact on water quality; (2) Determine primary recharge locations and their vulnerability to climate change; and (3) Delineate the most vulnerable areas and describe the likely impacts to recharge.

  8. LLNL NESHAPs, 1993 annual report

    International Nuclear Information System (INIS)

    Harrach, R.J.; Surano, K.A.; Biermann, A.H.; Gouveia, F.J.; Fields, B.C.; Tate, P.J.

    1994-06-01

    The standard defined in NESHAPSs CFR Part 61.92 limits the emission of radionuclides to the ambient air from DOE facilities to those that would cause any member of the public to receive in any year an effective dose equivalent of 10 mrem. In August 1993 DOE and EPA signed a Federal Facility Compliance Agreement which established a schedule of work for LLNL to perform to demonstrate compliance with NESHAPs, 40 CFR part 61, Subpart H. The progress in LLNL's NESHAPs program - evaluations of all emission points for the Livermore site and Site 300, of collective EDEs for populations within 80 km of each site, status in reguard to continuous monitoring requirements and periodic confirmatory measurements, improvements in the sampling and monitoring systems and progress on a NESHAPs quality assurance program - is described in this annual report. In April 1994 the EPA notified DOE and LLNL that all requirements of the FFCA had been met, and that LLNL was in compliance with the NESHAPs regulations

  9. LLNL Site 200 Risk Management Plan

    International Nuclear Information System (INIS)

    Pinkston, D.; Johnson, M.

    2008-01-01

    It is the Lawrence Livermore National Laboratory's (LLNL) policy to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage using the Integrated Safety Management System. The environment, safety, and health are to take priority in the planning and execution of work activities at the Laboratory. Furthermore, it is the policy of LLNL to comply with applicable ES and H laws, regulations, and requirements (LLNL Environment, Safety and Health Manual, Document 1.2, ES and H Policies of LLNL). The program and policies that improve LLNL's ability to prevent or mitigate accidental releases are described in the LLNL Environment, Health, and Safety Manual that is available to the public. The laboratory uses an emergency management system known as the Incident Command System, in accordance with the California Standardized Emergency Management System (SEMS) to respond to Operational Emergencies and to mitigate consequences resulting from them. Operational Emergencies are defined as unplanned, significant events or conditions that require time-urgent response from outside the immediate area of the incident that could seriously impact the safety or security of the public, LLNL's employees, its facilities, or the environment. The Emergency Plan contains LLNL's Operational Emergency response policies, commitments, and institutional responsibilities for managing and recovering from emergencies. It is not possible to list in the Emergency Plan all events that could occur during any given emergency situation. However, a combination of hazard assessments, an effective Emergency Plan, and Emergency Plan Implementing Procedures (EPIPs) can provide the framework for responses to postulated emergency situations. Revision 7, 2004 of the above mentioned LLNL Emergency Plan is available to the public. The most recent revision of the LLNL Emergency Plan LLNL-AM-402556, Revision 11, March

  10. Work and minor work contracts

    CERN Document Server

    1999-01-01

    The Work and Minor Work contracts are all of the result-oriented type. The work is specified by CERN and the contractor is given full responsibility for its performance. The contracts are thus very similar to supply contracts. The re-tendering of the existing contracts is almost complete, except for some building maintenance contracts. A new cycle of re-tendering for some activities will be launched in the next twelve months. The total estimated expenditure in the year 2000 for the contracts referred to in this document is 27 750 000 Swiss francs at 1999 prices. The Finance Committee is invited: - to approve the proposed expenditure for the extension of contracts for which the estimated amount for the year 2000 exceeds 750 000 Swiss francs, namely those under references 1, 2, 3, 5, 7, 8, 9 and 23, highlighted in Table I; - to take note that all Work and Minor Work contracts have been tendered since 1 January 1994, except the small contracts shown under references 12 and 16 in Table I; - to take note that the ...

  11. The LLNL AMS facility

    International Nuclear Information System (INIS)

    Roberts, M.L.; Bench, G.S.; Brown, T.A.

    1996-05-01

    The AMS facility at Lawrence Livermore National Laboratory (LLNL) routinely measures the isotopes 3 H, 7 Be, 10 Be, 14 C, 26 Al, 36 Cl, 41 Ca, 59,63 Ni, and 129 I. During the past two years, over 30,000 research samples have been measured. Of these samples, approximately 30% were for 14 C bioscience tracer studies, 45% were 14 C samples for archaeology and the geosciences, and the other isotopes constitute the remaining 25%. During the past two years at LLNL, a significant amount of work has gone into the development of the Projectile X-ray AMS (PXAMS) technique. PXAMS uses induced characteristic x-rays to discriminate against competing atomic isobars. PXAMS has been most fully developed for 63 Ni but shows promise for the measurement of several other long lived isotopes. During the past year LLNL has also conducted an 129 I interlaboratory comparison exercise. Recent hardware changes at the LLNL AMS facility include the installation and testing of a new thermal emission ion source, a new multianode gas ionization detector for general AMS use, re-alignment of the vacuum tank of the first of the two magnets that make up the high energy spectrometer, and a new cryo-vacuum system for the AMS ion source. In addition, they have begun design studies and carried out tests for a new high-resolution injector and a new beamline for heavy element AMS

  12. The National Ignition Facility (NIF) and High Energy Density Science Research at LLNL (Briefing Charts)

    Science.gov (United States)

    2013-06-21

    The National Ignition Facility ( NIF ) and High Energy Density Science Research at LLNL Presentation to: IEEE Pulsed Power and Plasma Science...Conference C. J. Keane Director, NIF User Office June 21, 2013 1491978-1-4673-5168-3/13/$31.00 ©2013 IEEE Report Documentation Page Form ApprovedOMB No...4. TITLE AND SUBTITLE The National Ignition Facility ( NIF ) and High Energy Density Science Research at LLNL 5a. CONTRACT NUMBER 5b. GRANT

  13. Dielectronic Satellite Spectra of Na-like Mo Ions Benchmarked by LLNL EBIT with Application to HED Plasmas

    Science.gov (United States)

    Stafford, A.; Safronova, A. S.; Kantsyrev, V. L.; Safronova, U. I.; Petkov, E. E.; Shlyaptseva, V. V.; Childers, R.; Shrestha, I.; Beiersdorfer, P.; Hell, H.; Brown, G. V.

    2017-10-01

    Dielectronic recombination (DR) is an important process for astrophysical and laboratory high energy density (HED) plasmas and the associated satellite lines are frequently used for plasma diagnostics. In particular, K-shell DR satellite lines were studied in detail in low-Z plasmas. L-shell Na-like spectral features from Mo X-pinches considered here represent the blend of DR and inner shell satellites and motivated the detailed study of DR at the EBIT-1 electron beam ion trap at LLNL. In these experiments the beam energy was swept between 0.6 - 2.4 keV to produce resonances at certain electron beam energies. The advantages of using an electron beam ion trap to better understand atomic processes with highly ionized ions in HED Mo plasma are highlighted. This work was supported by NNSA under DOE Grant DE-NA0002954. Work at LLNL was performed under the auspices of the U.S. DOE under Contract No. DE-AC52-07NA27344.

  14. Nuclear physics and heavy element research at LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Stoyer, M A; Ahle, L E; Becker, J A; Bernstein, L A; Bleuel, D L; Burke, J T; Dashdorj, D; Henderson, R A; Hurst, A M; Kenneally, J M; Lesher, S R; Moody, K J; Nelson, S L; Norman, E B; Pedretti, M; Scielzo, N D; Shaughnessy, D A; Sheets, S A; Stoeffl, W; Stoyer, N J; Wiedeking, M; Wilk, P A; Wu, C Y

    2009-05-11

    This paper highlights some of the current basic nuclear physics research at Lawrence Livermore National Laboratory (LLNL). The work at LLNL concentrates on investigating nuclei at the extremes. The Experimental Nuclear Physics Group performs research to improve our understanding of nuclei, nuclear reactions, nuclear decay processes and nuclear astrophysics; an expertise utilized for important laboratory national security programs and for world-class peer-reviewed basic research.

  15. Training the Masses ? Web-based Laser Safety Training at LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Sprague, D D

    2004-12-17

    The LLNL work smart standard requires us to provide ongoing laser safety training for a large number of persons on a three-year cycle. In order to meet the standard, it was necessary to find a cost and performance effective method to perform this training. This paper discusses the scope of the training problem, specific LLNL training needs, various training methods used at LLNL, the advantages and disadvantages of these methods and the rationale for selecting web-based laser safety training. The tools and costs involved in developing web-based training courses are also discussed, in addition to conclusions drawn from our training operating experience. The ILSC lecture presentation contains a short demonstration of the LLNL web-based laser safety-training course.

  16. LLNL 1981: technical horizons

    International Nuclear Information System (INIS)

    1981-07-01

    Research programs at LLNL for 1981 are described in broad terms. In his annual State of the Laboratory address, Director Roger Batzel projected a $481 million operating budget for fiscal year 1982, up nearly 13% from last year. In projects for the Department of Energy and the Department of Defense, the Laboratory applies its technical facilities and capabilities to nuclear weapons design and development and other areas of defense research that include inertial confinement fusion, nonnuclear ordnances, and particle-beam technology. LLNL is also applying its unique experience and capabilities to a variety of projects that will help the nation meet its energy needs in an environmentally acceptable manner. A sampling of recent achievements by LLNL support organizations indicates their diversity

  17. Thermochemical hydrogen production studies at LLNL: a status report

    International Nuclear Information System (INIS)

    Krikorian, O.H.

    1982-01-01

    Currently, studies are underway at the Lawrence Livermore National Laboratory (LLNL) on thermochemical hydrogen production based on magnetic fusion energy (MFE) and solar central receivers as heat sources. These areas of study were described earlier at the previous IEA Annex I Hydrogen Workshop (Juelich, West Germany, September 23-25, 1981), and a brief update will be given here. Some basic research has also been underway at LLNL on the electrolysis of water from fused phosphate salts, but there are no current results in that area, and the work is being terminated

  18. Capabilities required to conduct the LLNL plutonium mission

    International Nuclear Information System (INIS)

    Kass, J.; Bish, W.; Copeland, A.; West, J.; Sack, S.; Myers, B.

    1991-01-01

    This report outlines the LLNL plutonium related mission anticipated over the next decade and defines the capabilities required to meet that mission wherever the Plutonium Facility is located. If plutonium work is relocated to a place where the facility is shared, then some capabilities can be commonly used by the sharing parties. However, it is essential that LLNL independently control about 20000 sq ft of net lab space, filled with LLNL controlled equipment, and staffed by LLNL employees. It is estimated that the cost to construct this facility should range from $140M to $200M. Purchase and installation of equipment to replace that already in Bldg 332 along with additional equipment identified as being needed to meet the mission for the next ten to fifteen years, is estimated to cost $118M. About $29M of the equipment could be shared. The Hardened Engineering Test Building (HETB) with its additional 8000 sq ft of unique test capability must also be replaced. The fully equipped replacement cost is estimated to be about $10M. About 40000 sq ft of setup and support space are needed along with office and related facilities for a 130 person resident staff. The setup space is estimated to cost $8M. The annual cost of a 130 person resident staff (100 programmatic and 30 facility operation) is estimated to be $20M

  19. LLNL Chemical Kinetics Modeling Group

    Energy Technology Data Exchange (ETDEWEB)

    Pitz, W J; Westbrook, C K; Mehl, M; Herbinet, O; Curran, H J; Silke, E J

    2008-09-24

    The LLNL chemical kinetics modeling group has been responsible for much progress in the development of chemical kinetic models for practical fuels. The group began its work in the early 1970s, developing chemical kinetic models for methane, ethane, ethanol and halogenated inhibitors. Most recently, it has been developing chemical kinetic models for large n-alkanes, cycloalkanes, hexenes, and large methyl esters. These component models are needed to represent gasoline, diesel, jet, and oil-sand-derived fuels.

  20. FY16 LLNL Omega Experimental Programs

    International Nuclear Information System (INIS)

    Heeter, R. F.; Ali, S. J.; Benstead, J.; Celliers, P. M.; Coppari, F.; Eggert, J.; Erskine, D.; Panella, A. F.; Fratanduono, D. E.; Hua, R.; Huntington, C. M.; Jarrott, L. C.; Jiang, S.; Kraus, R. G.; Lazicki, A. E.; LePape, S.; Martinez, D. A.; McNaney, J. M.; Millot, M. A.; Moody, J.; Pak, A. E.; Park, H. S.; Ping, Y.; Pollock, B. B.; Rinderknecht, H.; Ross, J. S.; Rubery, M.; Sio, H.; Smith, R. F.; Swadling, G. F.; Wehrenberg, C. E.; Collins, G. W.; Landen, O. L.; Wan, A.; Hsing, W.

    2016-01-01

    In FY16, LLNL's High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall, these LLNL programs led 430 target shots in FY16, with 304 shots using just the OMEGA laser system, and 126 shots using just the EP laser system. Approximately 21% of the total number of shots (77 OMEGA shots and 14 EP shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 79% (227 OMEGA shots and 112 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports. In addition to these experiments, LLNL Principal Investigators led a variety of Laboratory Basic Science campaigns using OMEGA and EP, including 81 target shots using just OMEGA and 42 shots using just EP. The highlights of these are also summarized, following the ICF and HED campaigns. Overall, LLNL PIs led a total of 553 shots at LLE in FY 2016. In addition, LLNL PIs also supported 57 NLUF shots on Omega and 31 NLUF shots on EP, in collaboration with the academic community.

  1. Status of LLNL granite projects

    International Nuclear Information System (INIS)

    Ramspott, L.D.

    1980-01-01

    The status of LLNL Projects dealing with nuclear waste disposal in granitic rocks is reviewed. This review covers work done subsequent to the June 1979 Workshop on Thermomechanical Modeling for a Hardrock Waste Repository and is prepared for the July 1980 Workshop on Thermomechanical-Hydrochemical Modeling for a Hardrock Waste Repository. Topics reviewed include laboratory determination of thermal, mechanical, and transport properties of rocks at conditions simulating a deep geologic repository, and field testing at the Climax granitic stock at the USDOE Nevada Test Site

  2. Laser wakefields at UCLA and LLNL

    International Nuclear Information System (INIS)

    Mori, W.B.; Clayton, C.E.; Joshi, C.; Dawson, J.M.; Decker, C.B.; Marsh, K.; Katsouleas, T.; Darrow, C.B.; Wilks, S.C.

    1991-01-01

    The authors report on recent progress at UCLA and LLNL on the nonlinear laser wakefield scheme. They find advantages to operating in the limit where the laser pulse is narrow enough to expel all the plasma electrons from the focal region. A description of the experimental program for the new short pulse 10 TW laser facility at LLNL is also presented

  3. Lawrence Livermore National Laboratory (LLNL) Waste Minimization Program Plan

    International Nuclear Information System (INIS)

    Heckman, R.A.; Tang, W.R.

    1989-01-01

    This Program Plan document describes the background of the Waste Minimization field at Lawrence Livermore National Laboratory (LLNL) and refers to the significant studies that have impacted on legislative efforts, both at the federal and state levels. A short history of formal LLNL waste minimization efforts is provided. Also included are general findings from analysis of work to date, with emphasis on source reduction findings. A short summary is provided on current regulations and probable future legislation which may impact on waste minimization methodology. The LLN Waste Minimization Program Plan is designed to be dynamic and flexible so as to meet current regulations, and yet is able to respond to an everchanging regulatory environment. 19 refs., 12 figs., 8 tabs

  4. FY16 LLNL Omega Experimental Programs

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ali, S. J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Benstead, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Celliers, P. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Coppari, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Eggert, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Erskine, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Panella, A. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fratanduono, D. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hua, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Huntington, C. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jarrott, L. C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jiang, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kraus, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lazicki, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); LePape, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martinez, D. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNaney, J. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Millot, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Moody, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pak, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Park, H. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ping, Y. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pollock, B. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rinderknecht, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ross, J. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rubery, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sio, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Swadling, G. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wehrenberg, C. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Collins, G. W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Landen, O. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wan, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hsing, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-12-01

    In FY16, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall, these LLNL programs led 430 target shots in FY16, with 304 shots using just the OMEGA laser system, and 126 shots using just the EP laser system. Approximately 21% of the total number of shots (77 OMEGA shots and 14 EP shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 79% (227 OMEGA shots and 112 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports. In addition to these experiments, LLNL Principal Investigators led a variety of Laboratory Basic Science campaigns using OMEGA and EP, including 81 target shots using just OMEGA and 42 shots using just EP. The highlights of these are also summarized, following the ICF and HED campaigns. Overall, LLNL PIs led a total of 553 shots at LLE in FY 2016. In addition, LLNL PIs also supported 57 NLUF shots on Omega and 31 NLUF shots on EP, in collaboration with the academic community.

  5. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  6. Final report for the 1996 DOE grant supporting research at the SLAC/LBNL/LLNL B factory

    International Nuclear Information System (INIS)

    Judd, D.; Wright, D.

    1997-01-01

    This final report discusses Department of Energy-supported research funded through Lawrence Livermore National Laboratory (LLNL) which was performed as part of a collaboration between LLNL and Prairie View A and M University to develop part of the BaBar detector at the SLAC B Factory. This work focuses on the Instrumented Flux Return (IFR) subsystem of BaBar and involves a full range of detector development activities: computer simulations of detector performance, creation of reconstruction algorithms, and detector hardware R and D. Lawrence Livermore National Laboratory has a leading role in the IFR subsystem and has established on-site computing and detector facilities to conduct this research. By establishing ties with the existing LLNL Research Collaboration Program and leveraging LLNL resources, the experienced Prairie View group was able to quickly achieve a more prominent role within the BaBar collaboration and make significant contributions to the detector design. In addition, this work provided the first entry point for Historically Black Colleges and Universities into the B Factory collaboration, and created an opportunity to train a new generation of minority students at the premier electron-positron high energy physics facility in the US

  7. Quantification of contraction synchronicity and contraction work in coronary artery disease

    Energy Technology Data Exchange (ETDEWEB)

    Niimi, Takanaga; Nanasato, Mamoru [Nagoya Daini Red Cross Hospital, Nagoya (Japan); Maeda, Hisatoshi [Dept. of Radiological Technology, Nagoya University School of Health Sciences, Nagoya(Japan)

    2017-09-15

    This study quantified the contraction synchronicity (CS; with 100% representing full synchrony and −100% dyssynchrony) and contraction work (CW, millijoules per centimeter squared; representing myocardial area) in patients with reduced left ventricular ejection fraction (LVEF) associated with coronary artery disease (CAD)

  8. National Uranium Resource Evaluation Program: the Hydrogeochemical Stream Sediment Reconnaissance Program at LLNL

    International Nuclear Information System (INIS)

    Higgins, G.H.

    1980-08-01

    From early 1975 to mid 1979, Lawrence Livermore National Laboratory (LLNL) participated in the Hydrogeochemical Stream Sediment Reconnaissance (HSSR), part of the National Uranium Resource Evaluation (NURE) program sponsored by the Department of Energy (DOE). The Laboratory was initially responsible for collecting, analyzing, and evaluating sediment and water samples from approximately 200,000 sites in seven western states. Eventually, however, the NURE program redefined its sampling priorities, objectives, schedules, and budgets, with the increasingly obvious result that LLNL objectives and methodologies were not compatible with those of the NURE program office, and the LLNL geochemical studies were not relevant to the program goal. The LLNL portion of the HSSR program was consequently terminated, and all work was suspended by June 1979. Of the 38,000 sites sampled, 30,000 were analyzed by instrumental neutron activation analyses (INAA), delayed neutron counting (DNC), optical emission spectroscopy (OES), and automated chloride-sulfate analyses (SC). Data from about 13,000 sites have been formally reported. From each site, analyses were published of about 30 of the 60 elements observed. Uranium mineralization has been identified at several places which were previously not recognized as potential uranium source areas, and a number of other geochemical anomalies were discovered

  9. LLNL Waste Minimization Program Plan

    International Nuclear Information System (INIS)

    1990-01-01

    This document is the February 14, 1990 version of the LLNL Waste Minimization Program Plan (WMPP). The Waste Minimization Policy field has undergone continuous changes since its formal inception in the 1984 HSWA legislation. The first LLNL WMPP, Revision A, is dated March 1985. A series of informal revision were made on approximately a semi-annual basis. This Revision 2 is the third formal issuance of the WMPP document. EPA has issued a proposed new policy statement on source reduction and recycling. This policy reflects a preventative strategy to reduce or eliminate the generation of environmentally-harmful pollutants which may be released to the air, land surface, water, or ground water. In accordance with this new policy new guidance to hazardous waste generators on the elements of a Waste Minimization Program was issued. In response to these policies, DOE has revised and issued implementation guidance for DOE Order 5400.1, Waste Minimization Plan and Waste Reduction reporting of DOE Hazardous, Radioactive, and Radioactive Mixed Wastes, final draft January 1990. This WMPP is formatted to meet the current DOE guidance outlines. The current WMPP will be revised to reflect all of these proposed changes when guidelines are established. Updates, changes and revisions to the overall LLNL WMPP will be made as appropriate to reflect ever-changing regulatory requirements. 3 figs., 4 tabs

  10. Contracting: The modern way to work. A professional's perspective

    International Nuclear Information System (INIS)

    Banks, C.D.; Pavan, E.A.

    1991-01-01

    The relationship between employers and employees in the oil and gas industry has undergone some fundamental changes, including increasing use of contract professionals, work sharing, more work done at home, individuals partnering or in association with groups of professionals, and transfer of properties to subsidiaries or contract management organizations. The use of contract professionals and technical personnel within an existing corporate structure is examined. Reasons for individuals to choose contracting include career choice, early- or semi-retired status, between jobs, and family/personal reasons. Contracting provides a more open relationship between the professional and the contractor, allows professionals to pursue a career of choice, and gives time flexibility. By contracting through a linking company, a professional can earn about the same annual income as through regular employment if 220 days of work a year can obtained. 1 tab

  11. 14 CFR 151.49 - Performance of construction work: Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Contract... § 151.49 Performance of construction work: Contract requirements. (a) Contract provisions. In addition to any other provisions necessary to ensure completion of the work in accordance with the grant...

  12. Joint FAM/Line Management Assessment Report on LLNL Machine Guarding Safety Program

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, J. J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-07-19

    The LLNL Safety Program for Machine Guarding is implemented to comply with requirements in the ES&H Manual Document 11.2, "Hazards-General and Miscellaneous," Section 13 Machine Guarding (Rev 18, issued Dec. 15, 2015). The primary goal of this LLNL Safety Program is to ensure that LLNL operations involving machine guarding are managed so that workers, equipment and government property are adequately protected. This means that all such operations are planned and approved using the Integrated Safety Management System to provide the most cost effective and safest means available to support the LLNL mission.

  13. LLNL NESHAPs 2014 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bertoldo, N. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gallegos, G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); MacQueen, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wegrecki, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-07-01

    Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (LLNL) where radionuclides are handled and stored. These facilities are subject to the U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAPs) in Code of Federal Regulations (CFR) Title 40, Part 61, Subpart H, which regulates radionuclide emissions to air from Department of Energy (DOE) facilities. Specifically, NESHAPs limits the emission of radionuclides to the ambient air to levels resulting in an annual effective dose equivalent of 10 mrem (100 μSv) to any member of the public. Using measured and calculated emissions, and building-specific and common parameters, LLNL personnel applied the EPA-approved computer code, CAP88-PC, Version 4.0.1.17, to calculate the dose to the maximally exposed individual member of the public for the Livermore Site and Site 300.

  14. Study of laser-generated debris free x-ray sources produced in a high-density linear Ar, Kr, Xe, Kr/Ar and Xe/Kr/Ar mixtures gas jets by 2 ω, sub-ps LLNL Titan laser

    Science.gov (United States)

    Kantsyrev, V. L.; Schultz, K. A.; Shlyaptseva, V. V.; Safronova, A. S.; Cooper, M. C.; Shrestha, I. K.; Petkov, E. E.; Stafford, A.; Moschella, J. J.; Schmidt-Petersen, M. T.; Butcher, C. J.; Kemp, G. E.; Andrews, S. D.; Fournier, K. B.

    2016-10-01

    The study of laser-generated debris-free x-ray sources in an underdense plasma produced in a high-density linear gas-puff jet was carried out at the LLNL Titan laser (2 ω, 45 J, sub-ps) with an intensity in the 10 um focal spot of 7 x 1019 W/cm2. A linear nozzle with a fast valve was used for the generation of a clusters/gas jet. X-ray diagnostics for the spectral region of 0.7 - 9 keV include: two spectrometers and pinhole cameras, and 3 groups of fast filtered detectors. Electron beams were measured with the EPPS magnetic spectrometer (>1 MeV) and Faraday cups (>72 keV). Spectralon/spectrometer devices were also used to measure absorption of laser radiation in the jets. New results were obtained on: anisotropic generation of x-rays (laser to x-ray conversion coefficient was >1%) and characteristics of laser-generated electron beams; evolution of x-ray generation with the location of the laser focus in a cluster-gas jet, and observations of a strong x-ray flash in some focusing regimes. Non-LTE kinetic modeling was used to estimate plasma parameters. UNR work supported by the DTRA Basic Research Award # HDTRA1-13-1-0033. Work at LLNL was performed under the auspices of the U.S. DOE by LLNL under Contract DE-AC52-07NA27344.

  15. Probabilistic Seismic Hazards Update for LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Menchawi, O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fernandez, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-03-30

    Fugro Consultants, Inc. (FCL) completed the Probabilistic Seismic Hazard Analysis (PSHA) performed for Building 332 at the Lawrence Livermore National Laboratory (LLNL), near Livermore, CA. The study performed for the LLNL site includes a comprehensive review of recent information relevant to the LLNL regional tectonic setting and regional seismic sources in the vicinity of the site and development of seismic wave transmission characteristics. The Seismic Source Characterization (SSC), documented in Project Report No. 2259-PR-02 (FCL, 2015b), and Ground Motion Characterization (GMC), documented in Project Report No. 2259-PR-06 (FCL, 2015a) were developed in accordance with ANS/ANSI 2.29- 2008 Level 2 PSHA guidelines. The ANS/ANSI 2.29-2008 Level 2 PSHA framework is documented in Project Report No. 2259-PR-05 (FCL, 2016a). The Hazard Input Document (HID) for input into the PSHA developed from the SSC and GMC is presented in Project Report No. 2259-PR-04 (FCL, 2016b). The site characterization used as input for development of the idealized site profiles including epistemic uncertainty and aleatory variability is presented in Project Report No. 2259-PR-03 (FCL, 2015c). The PSHA results are documented in Project Report No. 2259-PR-07 (FCL, 2016c).

  16. Development of positron diffraction and holography at LLNL

    International Nuclear Information System (INIS)

    Hamza, A.; Asoka-Kumar, P.; Stoeffl, W.; Howell, R.; Miller, D.; Denison, A.

    2003-01-01

    A low-energy positron diffraction and holography spectrometer is currently being constructed at the Lawrence Livermore National Laboratory (LLNL) to study surfaces and adsorbed structures. This instrument will operate in conjunction with the LLNL intense positron beam produced by the 100 MeV LINAC allowing data to be acquired in minutes rather than days. Positron diffraction possesses certain advantages over electron diffraction which are discussed. Details of the instrument based on that of low-energy electron diffraction are described

  17. LLNL/YMP Waste Container Fabrication and Closure Project

    International Nuclear Information System (INIS)

    1990-10-01

    The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) Program is studying Yucca Mountain, Nevada as a suitable site for the first US high-level nuclear waste repository. Lawrence Livermore National Laboratory (LLNL) has the responsibility for designing and developing the waste package for the permanent storage of high-level nuclear waste. This report is a summary of the technical activities for the LLNL/YMP Nuclear Waste Disposal Container Fabrication and Closure Development Project. Candidate welding closure processes were identified in the Phase 1 report. This report discusses Phase 2. Phase 2 of this effort involved laboratory studies to determine the optimum fabrication and closure processes. Because of budget limitations, LLNL narrowed the materials for evaluation in Phase 2 from the original six to four: Alloy 825, CDA 715, CDA 102 (or CDA 122) and CDA 952. Phase 2 studies focused on evaluation of candidate material in conjunction with fabrication and closure processes

  18. A Liquid work-life under public service contracting

    DEFF Research Database (Denmark)

    Lindholst, Christian

    for staff, however, are only poorly understood in current theory and research on public service contracting through partial concepts and a tendency to focus merely on negative outcomes. Against this shortfall, the aim in this paper is to build a conceptually and empirically richer and more authentic account......A part of the reality behind public service contracting in Denmark as well as in many other countries is that a growing number of people are employed in uncertain and temporary conditions and relations in what can be characterized as ‘liquidized’ work-lives. This reality and its consequences...... of staffs’ work-life under public service contracting. The paper relies empirically on focus group interviews in two cases of staff transfers in public service contracting with different levels of liquefaction. it is found that staff transfer is a composite experience for staff with differential outcomes...

  19. Joint research and development and exchange of technology on toxic material emergency response between LLNL and ENEA. 1985 progress report

    International Nuclear Information System (INIS)

    Dickerson, M.H.; Caracciolo, R.

    1986-01-01

    For the past six years, the US Department of Energy, LLNL, and the ENEA, Rome, Italy, have participated in cooperative studies for improving a systems approach to an emergency response following nuclear accidents. Technology exchange between LLNL and the ENEA was initially confined to the development, application, and evaluation of atmospheric transport and diffusion models. With the emergence of compatible hardware configurations between LLNL and ENEA, exchanges of technology and ideas for improving the development and implementation of systems are beginning to emerge. This report describes cooperative work that has occurred during the past three years, the present state of each system, and recommendations for future exchanges of technology

  20. Fire science at LLNL: A review

    Energy Technology Data Exchange (ETDEWEB)

    Hasegawa, H.K. (ed.)

    1990-03-01

    This fire sciences report from LLNL includes topics on: fire spread in trailer complexes, properties of welding blankets, validation of sprinkler systems, fire and smoke detectors, fire modeling, and other fire engineering and safety issues. (JEF)

  1. LLNL Compliance Plan for TRUPACT-2 Authorized Methods for Payload Control

    International Nuclear Information System (INIS)

    1995-03-01

    This document describes payload control at LLNL to ensure that all shipments of CH-TRU waste in the TRUPACT-II (Transuranic Package Transporter-II) meet the requirements of the TRUPACT-II SARP (safety report for packaging). This document also provides specific instructions for the selection of authorized payloads once individual payload containers are qualified for transport. The physical assembly of the qualified payload and operating procedures for the use of the TRUPACT-II, including loading and unloading operations, are described in HWM Procedure No. 204, based on the information in the TRUPACT-II SARP. The LLNL TRAMPAC, along with the TRUPACT-II operating procedures contained in HWM Procedure No. 204, meet the documentation needs for the use of the TRUPACT-II at LLNL. Table 14-1 provides a summary of the LLNL waste generation and certification procedures as they relate to TRUPACT-II payload compliance

  2. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Science.gov (United States)

    2010-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  3. Implementing necessary and sufficient standards for radioactive waste management at LLNL

    International Nuclear Information System (INIS)

    Sims, J.M.; Ladran, A.; Hoyt, D.

    1995-01-01

    Lawrence Livermore National Laboratory (LLNL) and the U.S. Department of Energy, Oakland Field Office (DOE/OAK), are participating in a pilot program to evaluate the process to develop necessary and sufficient sets of standards for contractor activities. This concept of contractor and DOE jointly and locally deciding on what constitutes the set of standards that are necessary and sufficient to perform work safely and in compliance with federal, state, and local regulations, grew out of DOE's Department Standards Committee (Criteria for the Department's Standards Program, August 1994, DOE/EH/-0416). We have chosen radioactive waste management activities as the pilot program at LLNL. This pilot includes low-level radioactive waste, transuranic (TRU) waste, and the radioactive component of low-level and TRU mixed wastes. Guidance for the development and implementation of the necessary and sufficient set of standards is provided in open-quotes The Department of Energy Closure Process for Necessary and Sufficient Sets of Standards,close quotes March 27, 1995 (draft)

  4. 48 CFR 36.609-3 - Work oversight in architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ... architect-engineer contracts. 36.609-3 Section 36.609-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 36.609-3 Work oversight in architect-engineer contracts. The contracting officer...

  5. 48 CFR 52.236-24 - Work Oversight in Architect-Engineer Contracts.

    Science.gov (United States)

    2010-10-01

    ... Architect-Engineer Contracts. 52.236-24 Section 52.236-24 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-24 Work Oversight in Architect-Engineer Contracts. As prescribed in 36.609-3, insert the following clause: Work Oversight in Architect-Engineer Contracts (APR 1984) The extent and...

  6. 45 CFR 2543.84 - Contract Work Hours and Safety Standards Act.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Contract Work Hours and Safety Standards Act. 2543... OTHER NON-PROFIT ORGANIZATIONS Statutory Compliance § 2543.84 Contract Work Hours and Safety Standards Act. Where applicable, all contracts awarded by recipients in excess of $2000 for construction...

  7. LLNL Waste Minimization Program Plan

    International Nuclear Information System (INIS)

    1990-05-01

    This document is the February 14, 1990 version of the LLNL Waste Minimization Program Plan (WMPP). Now legislation at the federal level is being introduced. Passage will result in new EPA regulations and also DOE orders. At the state level the Hazardous Waste Reduction and Management Review Act of 1989 was signed by the Governor. DHS is currently promulgating regulations to implement the new law. EPA has issued a proposed new policy statement on source reduction and recycling. This policy reflects a preventative strategy to reduce or eliminate the generation of environmentally-harmful pollutants which may be released to the air, land surface, water, or ground water. In accordance with this policy new guidance to hazardous waste generators on the elements of a Waste Minimization Program was issued. This WMPP is formatted to meet the current DOE guidance outlines. The current WMPP will be revised to reflect all of these proposed changes when guidelines are established. Updates, changes and revisions to the overall LLNL WMPP will be made as appropriate to reflect ever-changing regulatory requirements

  8. Final report on the LLNL compact torus acceleration project

    International Nuclear Information System (INIS)

    Eddleman, J.; Hammer, J.; Hartman, C.; McLean, H.; Molvik, A.

    1995-01-01

    In this report, we summarize recent work at LLNL on the compact torus (CT) acceleration project. The CT accelerator is a novel technique for projecting plasmas to high velocities and reaching high energy density states. The accelerator exploits magnetic confinement in the CT to stably transport plasma over large distances and to directed kinetic energies large in comparison with the CT internal and magnetic energy. Applications range from heating and fueling magnetic fusion devices, generation of intense pulses of x-rays or neutrons for weapons effects and high energy-density fusion concepts

  9. Evaluation of LLNL's Nuclear Accident Dosimeters at the CALIBAN Reactor September 2010

    International Nuclear Information System (INIS)

    Hickman, D.P.; Wysong, A.R.; Heinrichs, D.P.; Wong, C.T.; Merritt, M.J.; Topper, J.D.; Gressmann, F.A.; Madden, D.J.

    2011-01-01

    The Lawrence Livermore National Laboratory uses neutron activation elements in a Panasonic TLD holder as a personnel nuclear accident dosimeter (PNAD). The LLNL PNAD has periodically been tested using a Cf-252 neutron source, however until 2009, it was more than 25 years since the PNAD has been tested against a source of neutrons that arise from a reactor generated neutron spectrum that simulates a criticality. In October 2009, LLNL participated in an intercomparison of nuclear accident dosimeters at the CEA Valduc Silene reactor (Hickman, et.al. 2010). In September 2010, LLNL participated in a second intercomparison of nuclear accident dosimeters at CEA Valduc. The reactor generated neutron irradiations for the 2010 exercise were performed at the Caliban reactor. The Caliban results are described in this report. The procedure for measuring the nuclear accident dosimeters in the event of an accident has a solid foundation based on many experimental results and comparisons. The entire process, from receiving the activated NADs to collecting and storing them after counting was executed successfully in a field based operation. Under normal conditions at LLNL, detectors are ready and available 24/7 to perform the necessary measurement of nuclear accident components. Likewise LLNL maintains processing laboratories that are separated from the areas where measurements occur, but contained within the same facility for easy movement from processing area to measurement area. In the event of a loss of LLNL permanent facilities, the Caliban and previous Silene exercises have demonstrated that LLNL can establish field operations that will very good nuclear accident dosimetry results. There are still several aspects of LLNL's nuclear accident dosimetry program that have not been tested or confirmed. For instance, LLNL's method for using of biological samples (blood and hair) has not been verified since the method was first developed in the 1980's. Because LLNL and the other DOE

  10. Can labour contract differences in health and work-related attitudes be explained by quality of working life and job insecurity?

    Science.gov (United States)

    Wagenaar, Alfred F; Kompier, Michiel A J; Houtman, Irene L D; van den Bossche, Seth; Smulders, Peter; Taris, Toon W

    2012-10-01

    We hypothesise that due to a lower quality of working life and higher job insecurity, the health and work-related attitudes of temporary workers may be less positive compared to permanent workers. Therefore, we aimed to (1) examine differences between contract groups (i.e. permanent contract, temporary contract with prospect of permanent work, fixed-term contract, temporary agency contract and on-call contract) in the quality of working life, job insecurity, health and work-related attitudes and (2) investigate whether these latter contract group differences in health and work-related attitudes can be explained by differences in the quality of working life and/or job insecurity. Data were collected from the Netherlands Working Conditions Survey 2008 (N = 21,639), and Hypotheses were tested using analysis of variance and cross-table analysis. Temporary work was associated with fewer task demands and lower autonomy and was more often passive or high-strain work, while permanent work was more often active work. Except for on-call work, temporary work was more insecure and associated with worse health and work-related attitude scores than permanent work. Finally, the quality of working life and job insecurity partly accounted for most contract differences in work-related attitudes but not in health. Especially agency workers have a lower health status and worse work-related attitudes. Job redesign measures regarding their quality of working life and job insecurity are recommended.

  11. High intensity positron program at LLNL

    International Nuclear Information System (INIS)

    Asoka-Kumar, P.; Howell, R.; Stoeffl, W.; Carter, D.

    1999-01-01

    Lawrence Livermore National Laboratory (LLNL) is the home of the world's highest current beam of keV positrons. The potential for establishing a national center for materials analysis using positron annihilation techniques around this capability is being actively pursued. The high LLNL beam current will enable investigations in several new areas. We are developing a positron microprobe that will produce a pulsed, focused positron beam for 3-dimensional scans of defect size and concentration with submicron resolution. Below we summarize the important design features of this microprobe. Several experimental end stations will be available that can utilize the high current beam with a time distribution determined by the electron linac pulse structure, quasi-continuous, or bunched at 20 MHz, and can operate in an electrostatic or (and) magnetostatic environment. Some of the planned early experiments are: two-dimensional angular correlation of annihilation radiation of thin films and buried interfaces, positron diffraction holography, positron induced desorption, and positron induced Auger spectroscopy

  12. High intensity positron program at LLNL

    International Nuclear Information System (INIS)

    Asoka-Kumar, P.; Howell, R.H.; Stoeffl, W.

    1998-01-01

    Lawrence Livermore National Laboratory (LLNL) is the home of the world's highest current beam of keV positrons. The potential for establishing a national center for materials analysis using positron annihilation techniques around this capability is being actively pursued. The high LLNL beam current will enable investigations in several new areas. We are developing a positron microprobe that will produce a pulsed, focused positron beam for 3-dimensional scans of defect size and concentration with submicron resolution. Below we summarize the important design features of this microprobe. Several experimental end stations will be available that can utilize the high current beam with a time distribution determined by the electron linac pulse structure, quasi-continuous, or bunched at 20 MHz, and can operate in an electrostatic or (and) magnetostatic environment. Some of the planned early experiments are: two-dimensional angular correlation of annihilation radiation of thin films and buried interfaces, positron diffraction holography, positron induced desorption, and positron induced Auger spectra

  13. 48 CFR 936.609-3 - Work oversight in architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ... architect-engineer contracts. 936.609-3 Section 936.609-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 936.609-3 Work oversight in architect-engineer contracts. In addition to the clause at 48...

  14. The implicit contract: implications for health social work.

    Science.gov (United States)

    McCoyd, Judith L M

    2010-05-01

    Identifying common patient dynamics is useful for developing social work practice sensitivity in health social work. This article draws on findings from a study of women who terminated desired pregnancies because of fetal anomalies and identifies dynamics that may be applicable to many health settings. Data suggest that women have expectations that submission to medical care, particularly high-tech medical care, should ensure a positive outcome--in this case a healthy baby. Analysis of data reveals the presence of an implicit contract that the women hold with the medical system,"Mother Nature," or society. The analysis carries an implication that health social work should help patients develop realistic expectations about health care. The presence of implicit contracts may have further implications for liability and litigation. Social work roles and interventions are addressed.

  15. A Novel Approach to Semantic and Coreference Annotation at LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Firpo, M

    2005-02-04

    A case is made for the importance of high quality semantic and coreference annotation. The challenges of providing such annotation are described. Asperger's Syndrome is introduced, and the connections are drawn between the needs of text annotation and the abilities of persons with Asperger's Syndrome to meet those needs. Finally, a pilot program is recommended wherein semantic annotation is performed by people with Asperger's Syndrome. The primary points embodied in this paper are as follows: (1) Document annotation is essential to the Natural Language Processing (NLP) projects at Lawrence Livermore National Laboratory (LLNL); (2) LLNL does not currently have a system in place to meet its need for text annotation; (3) Text annotation is challenging for a variety of reasons, many related to its very rote nature; (4) Persons with Asperger's Syndrome are particularly skilled at rote verbal tasks, and behavioral experts agree that they would excel at text annotation; and (6) A pilot study is recommend in which two to three people with Asperger's Syndrome annotate documents and then the quality and throughput of their work is evaluated relative to that of their neuro-typical peers.

  16. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Science.gov (United States)

    2010-01-01

    ... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  17. LLNL X-ray Calibration and Standards Laboratory

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The LLNL X-ray Calibration and Standards Laboratory is a unique facility for developing and calibrating x-ray sources, detectors, and materials, and for conducting x-ray physics research in support of our weapon and fusion-energy programs

  18. LLNL NESHAPs 2015 Annual Report - June 2016

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, K. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gallegos, G. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); MacQueen, D. H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wegrecki, A. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-06-01

    Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (LLNL) in which radionuclides are handled and stored. These facilities are subject to the U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAPs) in Code of Federal Regulations (CFR) Title 40, Part 61, Subpart H, which regulates radionuclide emissions to air from Department of Energy (DOE) facilities. Specifically, NESHAPs limits the emission of radionuclides to the ambient air to levels resulting in an annual effective dose equivalent of 10 mrem (100 μSv) to any member of the public. Using measured and calculated emissions, and building-specific and common parameters, LLNL personnel applied the EPA-approved computer code, CAP88-PC, Version 4.0.1.17, to calculate the dose to the maximally exposed individual member of the public for the Livermore Site and Site 300.

  19. LLNL high-field coil program

    International Nuclear Information System (INIS)

    Miller, J.R.

    1986-01-01

    An overview is presented of the LLNL High-Field Superconducting Magnet Development Program wherein the technology is being developed for producing fields in the range of 15 T and higher for both mirror and tokamak applications. Applications requiring less field will also benefit from this program. In addition, recent results on the thermomechanical performance of cable-in-conduit conductor systems are presented and their importance to high-field coil design discussed

  20. LLNL pure positron plasma program

    International Nuclear Information System (INIS)

    Hartley, J.H.; Beck, B.R.; Cowan, T.E.; Howell, R.H.; McDonald, J.L.; Rohatgi, R.R.; Fajans, J.; Gopalan, R.

    1995-01-01

    Assembly and initial testing of the Positron Time-of-Flight Trap at the Lawrence Livermore National Laboratory (LLNL) Increase Pulsed Positron Facility has been completed. The goal of the project is to accumulate at high-density positron plasma in only a few seconds., in order to facilitate study that may require destructive diagnostics. To date, densities of at least 6 x 10 6 positrons per cm 3 have been achieved

  1. Study of the influence on emotional work contract nurses on Job Burnout

    Directory of Open Access Journals (Sweden)

    Song Changping

    2017-01-01

    Full Text Available Discuss the influences of contract nurse’ emotion work on job burnout and provide theoretical basis for reducing the job burnout of perception level which caused by emotion work of contract nurse. Methods: The data which comes from the questionnaire survey about the Chinese edition of Maslach job burnout scale for 298 contract nurse is used statistical analysis by SPSS11.5 software. Results: The current contract nurse is more inclined to “surface acting” on working and the nurses have a lower level “depersonalization” (P < 0.05, the difference is statistically significant and the more “deep acting” are used the lower level of job burnout. There is a various factors’ correlation between contract nurse’s emotion work and job burnout. : Conclusions: The “surface acting” could increase job burnout, “deep acting” and emotion expression requirements could increase personal job satisfaction.

  2. High intensity positron program at LLNL

    International Nuclear Information System (INIS)

    Asoka-Kumar, P.; Howell, R.; Stoeffl, W.; Carter, D.

    1999-01-01

    Lawrence Livermore National Laboratory (LLNL) is the home of the world close-quote s highest current beam of keV positrons. The potential for establishing a national center for materials analysis using positron annihilation techniques around this capability is being actively pursued. The high LLNL beam current will enable investigations in several new areas. We are developing a positron microprobe that will produce a pulsed, focused positron beam for 3-dimensional scans of defect size and concentration with submicron resolution. Below we summarize the important design features of this microprobe. Several experimental end stations will be available that can utilize the high current beam with a time distribution determined by the electron linac pulse structure, quasi-continuous, or bunched at 20 MHz, and can operate in an electrostatic or (and) magnetostatic environment. Some of the planned early experiments are: two-dimensional angular correlation of annihilation radiation of thin films and buried interfaces, positron diffraction holography, positron induced desorption, and positron induced Auger spectroscopy. copyright 1999 American Institute of Physics

  3. LLNL (Lawrence Livermore National Laboratory) research on cold fusion

    Energy Technology Data Exchange (ETDEWEB)

    Thomassen, K I; Holzrichter, J F [eds.

    1989-09-14

    With the appearance of reports on Cold Fusion,'' scientists at the Lawrence Livermore National Laboratory (LLNL) began a series of increasingly sophisticated experiments and calculations to explain these phenomena. These experiments can be categorized as follows: (a) simple experiments to replicate the Utah results, (b) more sophisticated experiments to place lower bounds on the generation of heat and production of nuclear products, (c) a collaboration with Texas A M University to analyze electrodes and electrolytes for fusion by-products in a cell producing 10% excess heat (we found no by-products), and (d) attempts to replicate the Frascati experiment that first found neutron bursts when high-pressure deuterium gas in a cylinder with Ti chips was temperature-cycled. We failed in categories (a) and (b) to replicate either the Pons/Fleischmann or the Jones phenomena. We have seen phenomena similar to the Frascati results, (d) but these low-level burst signals may not be coming from neutrons generated in the Ti chips. Summaries of our experiments are described in Section II, as is a theoretical effort based on cosmic ray muons to describe low-level neutron production. Details of the experimental groups' work are contained in the six appendices. At LLNL, independent teams were spontaneously formed in response to the early announcements on cold fusion. This report's format follows this organization.

  4. Hazardous-waste analysis plan for LLNL operations

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, R.S.

    1982-02-12

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste.

  5. Hazardous-waste analysis plan for LLNL operations

    International Nuclear Information System (INIS)

    Roberts, R.S.

    1982-01-01

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste

  6. Probabilistic Seismic Hazards Update for LLNL: PSHA Results Report

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Alfredo [Fugro Consultants, Inc., Houston, TX (United States); Altekruse, Jason [Fugro Consultants, Inc., Houston, TX (United States); Menchawi, Osman El [Fugro Consultants, Inc., Houston, TX (United States)

    2016-03-11

    This report presents the Probabilistic Seismic Hazard Analysis (PSHA) performed for Building 332 at the Lawrence Livermore National Laboratory (LLNL), near Livermore, CA by Fugro Consultants, Inc. (FCL). This report is specific to Building 332 only and not to other portions of the Laboratory. The study performed for the LLNL site includes a comprehensive review of recent information relevant to the LLNL regional tectonic setting and regional seismic sources in the vicinity of the site and development of seismic wave transmission characteristics. The Seismic Source Characterization (SSC), documented in Project Report No. 2259-PR-02 (FCL, 2015a), and Ground Motion Characterization (GMC), documented in Project Report No. 2259-PR-06 (FCL, 2015c) were developed in accordance with ANS/ANSI 2.29-2008 Level 2 PSHA guidelines. The ANS/ANSI 2.29-2008 Level 2 PSHA framework is documented in Project Report No. 2259-PR-05 (FCL, 2016a). The Hazard Input Document (HID) for input into the PSHA developed from the SSC is presented in Project Report No. 2259-PR-04 (FCL, 2016b). The site characterization used as input for development of the idealized site profiles including epistemic uncertainty and aleatory variability is presented in Project Report No. 2259-PR-03 (FCL, 2015b).

  7. LLNL/JNC repository collaboration interim progress report

    International Nuclear Information System (INIS)

    Bourcier, W.L.; Couch, R.G.; Gansemer, J.; Halsey, W.G.; Palmer, C.E.; Sinz, K.H.; Stout, R.B.; Wijesinghe, A.; Wolery, T.J.

    1999-01-01

    Under this Annex, a research program on the near-field performance assessment related to the geological disposal of radioactive waste will be carried out at the Lawrence Livermore National Laboratory (LLNL) in close collaboration with the Power Reactor and Nuclear Fuel Development Corporation of Japan (PNC). This program will focus on activities that provide direct support for PNC's near-term and long-term needs that will, in turn, utilize and further strengthen US capabilities for radioactive waste management. The work scope for two years will be designed based on the PNC's priorities for its second progress report (the H12 report) of research and development for high-level radioactive waste disposal and on the interest and capabilities of the LLNL. The work will focus on the chemical modeling for the near-field environment and long-term mechanical modeling of engineered barrier system as it evolves. Certain activities in this program will provide for a final iteration of analyses to provide additional technical basis prior to the year 2000 as determined in discussions with the PNC's technical coordinator. The work for two years will include the following activities: Activity 1: Chemical Modeling of EBS Materials Interactions--Task 1.1 Chemical Modeling of Iron Effects on Borosilicate Glass Durability; and Task 1.2 Changes in Overpack and Bentonite Properties Due to Metal, Bentonite and Water Interactions. Activity 2: Thermodynamic Database Validation and Comparison--Task 2.1 Set up EQ3/6 to Run with the Pitzer-based PNC Thermodynamic Data Base; Task 2.2 Provide Expert Consultation on the Thermodynamic Data Base; and Task 2.3 Provide Analysis of Likely Solubility Controls on Selenium. Activity 3: Engineered Barrier Performance Assessment of the Unsaturated, Oxidizing Transient--Task 3.1 Apply YMIM to PNC Transient EBS Performance; Task 3.2 Demonstrate Methods for Modeling the Return to Reducing Conditions; and Task 3.3 Evaluate the Potential for Stress Corrosion

  8. Diversification and strategic management of LLNL's R ampersand D portfolio

    International Nuclear Information System (INIS)

    Glinsky, M.E.

    1994-12-01

    Strategic management of LLNL's research effort is addressed. A general framework is established by presenting the McKinsey/BCG Matrix Analysis as it applies to the research portfolio. The framework is used to establish the need for the diversification into new attractive areas of research and for the improvement of the market position of existing research in those attractive areas. With the need for such diversification established, attention is turned to optimizing it. There are limited resources available. It is concluded that LLNL should diversify into only a few areas and try to obtain full market share as soon as possible

  9. LIFTERS-hyperspectral imaging at LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Fields, D. [Lawrence Livermore National Lab., CA (United States); Bennett, C.; Carter, M.

    1994-11-15

    LIFTIRS, the Livermore Imaging Fourier Transform InfraRed Spectrometer, recently developed at LLNL, is an instrument which enables extremely efficient collection and analysis of hyperspectral imaging data. LIFTIRS produces a spatial format of 128x128 pixels, with spectral resolution arbitrarily variable up to a maximum of 0.25 inverse centimeters. Time resolution and spectral resolution can be traded off for each other with great flexibility. We will discuss recent measurements made with this instrument, and present typical images and spectra.

  10. LLNL Mercury Project Trinity Open Science Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Brantley, Patrick [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dawson, Shawn [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McKinley, Scott [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); O' Brien, Matt [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Peters, Doug [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pozulp, Mike [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Becker, Greg [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mohror, Kathryn [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Moody, Adam [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-04-20

    The Mercury Monte Carlo particle transport code developed at Lawrence Livermore National Laboratory (LLNL) is used to simulate the transport of radiation through urban environments. These challenging calculations include complicated geometries and require significant computational resources to complete. As a result, a question arises as to the level of convergence of the calculations with Monte Carlo simulation particle count. In the Trinity Open Science calculations, one main focus was to investigate convergence of the relevant simulation quantities with Monte Carlo particle count to assess the current simulation methodology. Both for this application space but also of more general applicability, we also investigated the impact of code algorithms on parallel scaling on the Trinity machine as well as the utilization of the Trinity DataWarp burst buffer technology in Mercury via the LLNL Scalable Checkpoint/Restart (SCR) library.

  11. Women's Learning in Contract Work: Practicing Contradictions in Boundaryless Conditions

    Science.gov (United States)

    Fenwick, Tara

    2008-01-01

    The general rise in contractors, particularly among knowledge workers negotiating "boundaryless" employment conditions, has generated interest in the nature and forms of contract work. This article explores the learning of contract workers as they negotiate these conditions, with a focus on women. Drawing from a qualitative study of…

  12. The changing psychological contract at work and employee burnout.

    Science.gov (United States)

    Malach Pines, Ayala

    2002-01-01

    Today we stand in a vortex of technological, economic, and cultural changes that altered dramatically the world of labor and with it the psychological contract between employers and employees. While the effects of the changed contract at work are usually addressed from an organizational, social or economic perspective, the current article addresses it from a psychological perspective from which one noteworthy cost of the changed psychological contract is employee burnout. The article describes burnout, differentiates it from stress, and proposes an existential perspective to explain its underlying dynamic, using the results of a cross-cultural study of Israeli and American managers as an example. Recent studies on gender differences in management are used to point in the recommended for preventing employee burnout, despite the new psychological contract, namely--a democratic, egalitarian management style.

  13. Analyses in Support of Z-IFE LLNL Progress Report for FY-05

    International Nuclear Information System (INIS)

    Moir, R W; Abbott, R P; Callahan, D A; Latkowski, J F; Meier, W R; Reyes, S

    2005-01-01

    The FY04 LLNL study of Z-IFE [1] proposed and evaluated a design that deviated from SNL's previous baseline design. The FY04 study included analyses of shock mitigation, stress in the first wall, neutronics and systems studies. In FY05, the subject of this report, we build on our work and the theme of last year. Our emphasis continues to be on alternatives that hold promise of considerable improvements in design and economics compared to the base-line design. Our key results are summarized here

  14. Work engagement, psychological contract breach and job satisfaction

    OpenAIRE

    Rayton, Bruce A.; Yalabik, Zeynep Y.

    2014-01-01

    This study extends both Social Exchange Theory and the Job Demands-Resources model by examining the link between psychological contract breach (PCB) and work engagement, and by integrating job satisfaction into this exchange relationship. We argue that PCB reflects employees' feelings of resource loss, and that these feelings impact work engagement through their impact on job satisfaction. Levels of employee work engagement can therefore be viewed as reciprocation for the exchange content pro...

  15. Making contract farming work? : society and technology in Philippine transnational agribusiness

    OpenAIRE

    Vellema, S.

    2002-01-01

    Keywords: contract farming, agribusiness, Philippines, Southeast Asia, asparagus, hybrid maize

    Contract farming is a widespread and important tool for organising agricultural production in line with corporate strategies and market demands. This book analyses how Philippine farmers and transnational agribusiness make contract farming work in two production schemes in Mindanao: the export-oriented production of high-value asparagus and the risky production of hybrid maize see...

  16. LLNL Livermore site Groundwater Surveillance Plan

    International Nuclear Information System (INIS)

    1992-04-01

    Department of Energy (DOE) Order 5400.1 establishes environ-mental protection program requirements, authorities, and responsibilities for DOE operations to assume compliance with federal, state, and local environmental protection laws and regulations; Federal Executive Orders; and internal DOE policies. ne DOE Order contains requirements and guidance for environmental monitoring programs, the objectives of which are to demonstrate compliance with legal and regulatory requirements imposed by federal, state, and local agencies; confirm adherence to DOE environmental protection polices; and support environmental management decisions. The environmental monitoring programs consist of two major activities: (1) measurement and monitoring of effluents from DOE operations, and (2) surveillance through measurement, monitoring, and calculation of the effects of those operations on the environment and public health. The latter concern, that of assessing the effects, if any, of Lawrence Livermore National Laboratory (LLNL) operations and activities on on-site and off-site surface waters and groundwaters is addressed by an Environmental Surveillance Program being developed by LLNL. The Groundwater Surveillance Plan presented here has been developed on a sitespecific basis, taking into consideration facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, the extent and use of local water resources, and specific local public interest and concerns

  17. Impact of employment contract changes on workers' quality of working life, job insecurity, health and work-related attitudes.

    Science.gov (United States)

    Wagenaar, Alfred F; Kompier, Michiel A J; Houtman, Irene L D; van den Bossche, Seth N J; Taris, Toon W

    2012-01-01

    Changes in employment contracts may impact the quality of working life, job insecurity, health and work-related attitudes. We examined the validity of two partly competing theoretical approaches. Based upon a segmentation approach, we expected no change in scores among stable trajectories, whereas upward trajectories were expected to be for the better and downward trajectories to be for the worse (Hypothesis 1). As turnover theories suggest that this hypothesis may only apply to workers who do not change employer, we also examined these contract trajectories stratified for a change of employer (Hypothesis 2). Drawing on the 2007 and 2008 waves of the Netherlands Working Conditions Cohort Study (N=9,688), repeated measures analysis of covariance showed little across-time change in the criterion variables, thus largely disconfirming our first hypothesis. These results could (at least partly) be explained by employer change; this was generally associated with improved scores among all contract trajectories (Hypothesis 2). However, workers receiving a less stable contract from the same employer were found to be at risk for health and well-being problems. Segmentation theory-based assumptions on contract trajectories primarily apply to stable and downward contract trajectories at the same employer, whereas assumptions from turnover theories better apply to contract trajectories combined with a change of employer. Future research should focus more closely on factors predicting "involuntary" downward trajectories into precarious temporary employment or unemployment.

  18. LLNL medical and industrial laser isotope separation: large volume, low cost production through advanced laser technologies

    International Nuclear Information System (INIS)

    Comaskey, B.; Scheibner, K. F.; Shaw, M.; Wilder, J.

    1998-01-01

    The goal of this LDRD project was to demonstrate the technical and economical feasibility of applying laser isotope separation technology to the commercial enrichment (>lkg/y) of stable isotopes. A successful demonstration would well position the laboratory to make a credible case for the creation of an ongoing medical and industrial isotope production and development program at LLNL. Such a program would establish LLNL as a center for advanced medical isotope production, successfully leveraging previous LLNL Research and Development hardware, facilities, and knowledge

  19. Spill exercise 1980: an LLNL emergency training exercise

    International Nuclear Information System (INIS)

    Morse, J.L.; Gibson, T.A.; Vance, W.F.

    1981-01-01

    An emergency training exercise at Lawrence Livermore National Laboratory (LLNL) demonstrated that off-hours emergency personnel can respond promptly and effecively to an emergency situation involving radiation, hazardous chemicals, and injured persons. The exercise simulated an explosion in a chemistry laboratory and a subsequent toxic-gas release

  20. Job Insecurity and Innovative Work Behaviour: A Psychological Contract Perspective

    Directory of Open Access Journals (Sweden)

    Wendy Niesen

    2018-01-01

    Full Text Available Innovation is considered to be of crucial importance for organisational survival and growth, and in this respect employees play a leading role, as they are the ones who develop innovative ideas. At the same time, the struggle for organisational survival and growth gives rise to perceptions of job insecurity. To date, few studies have explored how employees’ innovative work behaviour (IWB is influenced by the perceived threat of job loss (i.e. job insecurity. As both job insecurity and IWB are increasingly salient in light of organisational change and competition, the present study examines the relationship between job insecurity and IWB, as well as the role of psychological contract breach in explaining this relationship. We hypothesized a negative relation between job insecurity and innovative work behaviour, with psychological contract breach as a mediator in this relationship. Participants were 190 employees from an industrial organisation that had faced restructuring and downsizing for several years. Contrary to our predictions, no direct association was found between job insecurity and the two sub-dimensions of innovative work behaviour (i.e., idea generation and idea implementation. Indirect relationships, however, were found between job insecurity and the two types of IWB through psychological contract breach. Surprisingly, psychological contract breach was positively related to idea generation and idea implementation. These findings shed new light on the relationship between job insecurity and IWB.

  1. Assessment of the proposed decontamination and waste treatment facility at LLNL

    International Nuclear Information System (INIS)

    Cohen, J.J.

    1987-01-01

    To provide a centralized decontamination and waste treatment facility (DWTF) at LLNL, the construction of a new installation has been planned. Objectives for this new facility were to replace obsolete, structurally and environmentally sub-marginal liquid and solid waste process facilities and decontamination facility and to bring these facilities into compliance with existing federal, state and local regulations as well as DOE orders. In a previous study, SAIC conducted a preliminary review and evaluation of existing facilities at LLNL and cost effectiveness of the proposed DWTF. This document reports on a detailed review of specific aspects of the proposed DWTF

  2. LLNL/YMP Waste Container Fabrication and Closure Project; GFY technical activity summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-10-01

    The Department of Energy`s Office of Civilian Radioactive Waste Management (OCRWM) Program is studying Yucca Mountain, Nevada as a suitable site for the first US high-level nuclear waste repository. Lawrence Livermore National Laboratory (LLNL) has the responsibility for designing and developing the waste package for the permanent storage of high-level nuclear waste. This report is a summary of the technical activities for the LLNL/YMP Nuclear Waste Disposal Container Fabrication and Closure Development Project. Candidate welding closure processes were identified in the Phase 1 report. This report discusses Phase 2. Phase 2 of this effort involved laboratory studies to determine the optimum fabrication and closure processes. Because of budget limitations, LLNL narrowed the materials for evaluation in Phase 2 from the original six to four: Alloy 825, CDA 715, CDA 102 (or CDA 122) and CDA 952. Phase 2 studies focused on evaluation of candidate material in conjunction with fabrication and closure processes.

  3. 48 CFR 215.404-71-3 - Contract type risk and working capital adjustment.

    Science.gov (United States)

    2010-10-01

    .... Cost-plus-incentive-free (4) 1.0 0 to 2. Cost-plus-fixed-fee (4) 0.5 0 to 1. Time-and-materials... considered cost-plus-fixed-fee contracts for the purposes of assigning profit values. They shall not receive... CONTRACTING BY NEGOTIATION Contract Pricing 215.404-71-3 Contract type risk and working capital adjustment. (a...

  4. Results of LLNL investigation of NYCT data sets

    International Nuclear Information System (INIS)

    Sale, K; Harrison, M; Guo, M; Groza, M

    2007-01-01

    Upon examination we have concluded that none of the alarms indicate the presence of a real threat. A brief history and results from our examination of the NYCT ASP occupancy data sets dated from 2007-05-14 19:11:07 to 2007-06-20 15:46:15 are presented in this letter report. When the ASP data collection campaign at NYCT was completed, rather than being shut down, the Canberra ASP annunciator box was unplugged leaving the data acquisition system running. By the time it was discovered that the ASP was still acquiring data about 15,000 occupancies had been recorded. Among these were about 500 alarms (classified by the ASP analysis system as either Threat Alarms or Suspect Alarms). At your request, these alarms have been investigated. Our conclusion is that none of the alarm data sets indicate the presence of a real threat (within statistics). The data sets (ICD1 and ICD2 files with concurrent JPEG pictures) were delivered to LLNL on a removable hard drive labeled FOUO. The contents of the data disk amounted to 53.39 GB of data requiring over two days for the standard LLNL virus checking software to scan before work could really get started. Our first step was to walk through the directory structure of the disk and create a database of occupancies. For each occupancy, the database was populated with the occupancy date and time, occupancy number, file path to the ICD1 data and the alarm ('No Alarm', 'Suspect Alarm' or 'Threat Alarm') from the ICD2 file along with some other incidental data. In an attempt to get a global understanding of what was going on, we investigated the occupancy information. The occupancy date/time and alarm type were binned into one-hour counts. These data are shown in Figures 1 and 2

  5. The LLNL portable tritium processing system

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The end of the Cold War significantly reduced the need for facilities to handle radioactive materials for the US nuclear weapons program. The LLNL Tritium Facility was among those slated for decommissioning. The plans for the facility have since been reversed, and it remains open. Nevertheless, in the early 1990s, the cleanup (the Tritium Inventory Removal Project) was undertaken. However, removing the inventory of tritium within the facility and cleaning up any pockets of high-level residual contamination required that we design a system adequate to the task and meeting today's stringent standards of worker and environmental protection. In collaboration with Sandia National Laboratory and EG ampersand G Mound Applied Technologies, we fabricated a three-module Portable Tritium Processing System (PTPS) that meets current glovebox standards, is operated from a portable console, and is movable from laboratory to laboratory for performing the basic tritium processing operations: pumping and gas transfer, gas analysis, and gas-phase tritium scrubbing. The Tritium Inventory Removal Project is now in its final year, and the portable system continues to be the workhorse. To meet a strong demand for tritium services, the LLNL Tritium Facility will be reconfigured to provide state-of-the-art tritium and radioactive decontamination research and development. The PTPS will play a key role in this new facility

  6. Evaluation of LLNL BSL-3 Maximum Credible Event Potential Consequence to the General Population and Surrounding Environment

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2010-08-16

    The purpose of this evaluation is to establish reproducibility of the analysis and consequence results to the general population and surrounding environment in the LLNL Biosafety Level 3 Facility Environmental Assessment (LLNL 2008).

  7. Can labour contract differences in health and work-related attitudes be explained by quality of working life and job insecurity?

    NARCIS (Netherlands)

    Wagenaar, A.F.; Kompier, M.A.J.; Houtman, I.L.D.; Bossche, S.N.J. van den; Smulders, P.G.W.; Taris, T.W.

    2012-01-01

    We hypothesise that due to a lower quality of working life and higher job insecurity, the health and work-related attitudes of temporary workers may be less positive compared to permanent workers. Therefore, we aimed to (1) examine differences between contract groups (i.e. permanent contract,

  8. Progress Toward Measuring CO2 Isotopologue Fluxes in situ with the LLNL Miniature, Laser-based CO2 Sensor

    Science.gov (United States)

    Osuna, J. L.; Bora, M.; Bond, T.

    2015-12-01

    One method to constrain photosynthesis and respiration independently at the ecosystem scale is to measure the fluxes of CO2­ isotopologues. Instrumentation is currently available to makes these measurements but they are generally costly, large, bench-top instruments. Here, we present progress toward developing a laser-based sensor that can be deployed directly to a canopy to passively measure CO2 isotopologue fluxes. In this study, we perform initial proof-of-concept and sensor characterization tests in the laboratory and in the field to demonstrate performance of the Lawrence Livermore National Laboratory (LLNL) tunable diode laser flux sensor. The results shown herein demonstrate measurement of bulk CO2 as a first step toward achieving flux measurements of CO2 isotopologues. The sensor uses a Vertical Cavity Surface Emitting Laser (VCSEL) in the 2012 nm range. The laser is mounted in a multi-pass White Cell. In order to amplify the absorption signal of CO2 in this range we employ wave modulation spectroscopy, introducing an alternating current (AC) bias component where f is the frequency of modulation on the laser drive current in addition to the direct current (DC) emission scanning component. We observed a strong linear relationship (r2 = 0.998 and r2 = 0.978 at all and low CO2 concentrations, respectively) between the 2f signal and the CO2 concentration in the cell across the range of CO2 concentrations relevant for flux measurements. We use this calibration to interpret CO2 concentration of a gas flowing through the White cell in the laboratory and deployed over a grassy field. We will discuss sensor performance in the lab and in situ as well as address steps toward achieving canopy-deployed, passive measurements of CO2 isotopologue fluxes. This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. LLNL-ABS-675788

  9. Proceedings of the LLNL Technical Women`s Symposium

    Energy Technology Data Exchange (ETDEWEB)

    von Holtz, E. [ed.

    1993-12-31

    This report documents events of the LLNL Technical Women`s Symposium. Topics include; future of computer systems, environmental technology, defense and space, Nova Inertial Confinement Fusion Target Physics, technical communication, tools and techniques for biology in the 1990s, automation and robotics, software applications, materials science, atomic vapor laser isotope separation, technical communication, technology transfer, and professional development workshops.

  10. The LLNL Multiuser Tandem Laboratory computer-controlled radiation monitoring system

    International Nuclear Information System (INIS)

    Homann, S.G.

    1992-01-01

    The Physics Department of the Lawrence Livermore National Laboratory (LLNL) recently constructed a Multiuser Tandem Laboratory (MTL) to perform a variety of basic and applied measurement programs. The laboratory and its research equipment were constructed with support from a consortium of LLNL Divisions, Sandia National Laboratories Livermore, and the University of California. Primary design goals for the facility were inexpensive construction and operation, high beam quality at a large number of experimental stations, and versatility in adapting to new experimental needs. To accomplish these goals, our main design decisions were to place the accelerator in an unshielded structure, to make use of reconfigured cyclotrons as effective switching magnets, and to rely on computer control systems for both radiological protection and highly reproducible and well-characterized accelerator operation. This paper addresses the radiological control computer system

  11. LLNL-G3Dv3: Global P wave tomography model for improved regional and teleseismic travel time prediction: LLNL-G3DV3---GLOBAL P WAVE TOMOGRAPHY

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, N. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Myers, S. C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Johannesson, G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Matzel, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2012-10-06

    [1] We develop a global-scale P wave velocity model (LLNL-G3Dv3) designed to accurately predict seismic travel times at regional and teleseismic distances simultaneously. The model provides a new image of Earth's interior, but the underlying practical purpose of the model is to provide enhanced seismic event location capabilities. The LLNL-G3Dv3 model is based on ∼2.8 millionP and Pnarrivals that are re-processed using our global multiple-event locator called Bayesloc. We construct LLNL-G3Dv3 within a spherical tessellation based framework, allowing for explicit representation of undulating and discontinuous layers including the crust and transition zone layers. Using a multiscale inversion technique, regional trends as well as fine details are captured where the data allow. LLNL-G3Dv3 exhibits large-scale structures including cratons and superplumes as well numerous complex details in the upper mantle including within the transition zone. Particularly, the model reveals new details of a vast network of subducted slabs trapped within the transition beneath much of Eurasia, including beneath the Tibetan Plateau. We demonstrate the impact of Bayesloc multiple-event location on the resulting tomographic images through comparison with images produced without the benefit of multiple-event constraints (single-event locations). We find that the multiple-event locations allow for better reconciliation of the large set of direct P phases recorded at 0–97° distance and yield a smoother and more continuous image relative to the single-event locations. Travel times predicted from a 3-D model are also found to be strongly influenced by the initial locations of the input data, even when an iterative inversion/relocation technique is employed.

  12. Dispersion of Radionuclides and Exposure Assessment in Urban Environments: A Joint CEA and LLNL Report

    International Nuclear Information System (INIS)

    Glascoe, Lee; Gowardhan, Akshay; Lennox, Kristin; Simpson, Matthew; Yu, Kristen; Armand, Patrick; Duchenne, Christophe; Mariotte, Frederic; Pectorin, Xavier

    2014-01-01

    In the interest of promoting the international exchange of technical expertise, the US Department of Energy’s Office of Emergency Operations (NA-40) and the French Commissariat à l'Energie Atomique et aux énergies alternatives (CEA) requested that the National Atmospheric Release Advisory Center (NARAC) of Lawrence Livermore National Laboratory (LLNL) in Livermore, California host a joint table top exercise with experts in emergency management and atmospheric transport modeling. In this table top exercise, LLNL and CEA compared each other's flow and dispersion models. The goal of the comparison is to facilitate the exchange of knowledge, capabilities, and practices, and to demonstrate the utility of modeling dispersal at different levels of computational fidelity. Two modeling approaches were examined, a regional scale modeling approach, appropriate for simple terrain and/or very large releases, and an urban scale modeling approach, appropriate for small releases in a city environment. This report is a summary of LLNL and CEA modeling efforts from this exercise. Two different types of LLNL and CEA models were employed in the analysis: urban-scale models (Aeolus CFD at LLNL/NARAC and Parallel- Micro-SWIFT-SPRAY, PMSS, at CEA) for analysis of a 5,000 Ci radiological release and Lagrangian Particle Dispersion Models (LODI at LLNL/NARAC and PSPRAY at CEA) for analysis of a much larger (500,000 Ci) regional radiological release. Two densely-populated urban locations were chosen: Chicago with its high-rise skyline and gridded street network and Paris with its more consistent, lower building height and complex unaligned street network. Each location was considered under early summer daytime and nighttime conditions. Different levels of fidelity were chosen for each scale: (1) lower fidelity mass-consistent diagnostic, intermediate fidelity Navier-Stokes RANS models, and higher fidelity Navier-Stokes LES for urban-scale analysis, and (2) lower-fidelity single

  13. Dispersion of Radionuclides and Exposure Assessment in Urban Environments: A Joint CEA and LLNL Report

    Energy Technology Data Exchange (ETDEWEB)

    Glascoe, Lee [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gowardhan, Akshay [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lennox, Kristin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Simpson, Matthew [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Yu, Kristen [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Armand, Patrick [Alternative Energies and Atomic Energy Commission (CEA), Paris (France); Duchenne, Christophe [Alternative Energies and Atomic Energy Commission (CEA), Paris (France); Mariotte, Frederic [Alternative Energies and Atomic Energy Commission (CEA), Paris (France); Pectorin, Xavier [Alternative Energies and Atomic Energy Commission (CEA), Paris (France)

    2014-12-19

    In the interest of promoting the international exchange of technical expertise, the US Department of Energy’s Office of Emergency Operations (NA-40) and the French Commissariat à l'Energie Atomique et aux énergies alternatives (CEA) requested that the National Atmospheric Release Advisory Center (NARAC) of Lawrence Livermore National Laboratory (LLNL) in Livermore, California host a joint table top exercise with experts in emergency management and atmospheric transport modeling. In this table top exercise, LLNL and CEA compared each other’s flow and dispersion models. The goal of the comparison is to facilitate the exchange of knowledge, capabilities, and practices, and to demonstrate the utility of modeling dispersal at different levels of computational fidelity. Two modeling approaches were examined, a regional scale modeling approach, appropriate for simple terrain and/or very large releases, and an urban scale modeling approach, appropriate for small releases in a city environment. This report is a summary of LLNL and CEA modeling efforts from this exercise. Two different types of LLNL and CEA models were employed in the analysis: urban-scale models (Aeolus CFD at LLNL/NARAC and Parallel- Micro-SWIFT-SPRAY, PMSS, at CEA) for analysis of a 5,000 Ci radiological release and Lagrangian Particle Dispersion Models (LODI at LLNL/NARAC and PSPRAY at CEA) for analysis of a much larger (500,000 Ci) regional radiological release. Two densely-populated urban locations were chosen: Chicago with its high-rise skyline and gridded street network and Paris with its more consistent, lower building height and complex unaligned street network. Each location was considered under early summer daytime and nighttime conditions. Different levels of fidelity were chosen for each scale: (1) lower fidelity mass-consistent diagnostic, intermediate fidelity Navier-Stokes RANS models, and higher fidelity Navier-Stokes LES for urban-scale analysis, and (2) lower-fidelity single

  14. Summary of the LLNL one-dimensional transport-kinetics model of the troposphere and stratosphere: 1981

    International Nuclear Information System (INIS)

    Wuebbles, D.J.

    1981-09-01

    Since the LLNL one-dimensional coupled transport and chemical kinetics model of the troposphere and stratosphere was originally developed in 1972 (Chang et al., 1974), there have been many changes to the model's representation of atmospheric physical and chemical processes. A brief description is given of the current LLNL one-dimensional coupled transport and chemical kinetics model of the troposphere and stratosphere

  15. Proceedings of the LLNL technical women`s symposium

    Energy Technology Data Exchange (ETDEWEB)

    von Holtz, E. [ed.

    1994-12-31

    Women from institutions such as LLNL, LBL, Sandia, and SLAC presented papers at this conference. The papers deal with many aspects of global security, global ecology, and bioscience; they also reflect the challenges faced in improving business practices, communicating effectively, and expanding collaborations in the industrial world. Approximately 87 ``abstracts`` are included in six sessions; more are included in the addendum.

  16. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  17. LLNL Contribution to LLE FY09 Annual Report: NIC and HED Results

    International Nuclear Information System (INIS)

    Heeter, R.F.; Landen, O.L.; Hsing, W.W.; Fournier, K.B.

    2009-01-01

    In FY09, LLNL led 238 target shots on the OMEGA Laser System. Approximately half of these LLNL-led shots supported the National Ignition Campaign (NIC). The remainder was dedicated to experiments for the high-energy-density stewardship experiments (HEDSE). Objectives of the LLNL led NIC campaigns at OMEGA included: (1) Laser-plasma interaction studies in physical conditions relevant for the NIF ignition targets; (2) Demonstration of Tr = 100 eV foot symmetry tuning using a reemission sphere; (3) X-ray scattering in support of conductivity measurements of solid density Be plasmas; (4) Experiments to study the physical properties (thermal conductivity) of shocked fusion fuels; (5) High-resolution measurements of velocity nonuniformities created by microscopic perturbations in NIF ablator materials; (6) Development of a novel Compton Radiography diagnostic platform for ICF experiments; and (7) Precision validation of the equation of state for quartz. The LLNL HEDSE campaigns included the following experiments: (1) Quasi-isentropic (ICE) drive used to study material properties such as strength, equation of state, phase, and phase-transition kinetics under high pressure; (2) Development of a high-energy backlighter for radiography in support of material strength experiments using Omega EP and the joint OMEGA-OMEGA-EP configuration; (3) Debris characterization from long-duration, point-apertured, point-projection x-ray backlighters for NIF radiation transport experiments; (4) Demonstration of ultrafast temperature and density measurements with x-ray Thomson scattering from short-pulse laser-heated matter; (5) The development of an experimental platform to study nonlocal thermodynamic equilibrium (NLTE) physics using direct-drive implosions; (6) Opacity studies of high-temperature plasmas under LTE conditions; and (7) Characterization of copper (Cu) foams for HEDSE experiments.

  18. Operating characteristics and modeling of the LLNL 100-kV electric gun

    International Nuclear Information System (INIS)

    Osher, J.E.; Barnes, G.; Chau, H.H.; Lee, R.S.; Lee, C.; Speer, R.; Weingart, R.C.

    1989-01-01

    In the electric gun, the explosion of an electrically heated metal foil and the accompanying magnetic forces drive a thin flyer plate up a short barrel. Flyer velocities of up to 18 km/s make the gun useful for hypervelocity impact studies. The authors briefly review the technological evolution of the exploding-metal circuit elements that power the gun, describe the 100-kV electric gun designed at Lawrence Livermore National Laboratory (LLNL) in some detail, and present the general principles of electric gun operation. They compare the experimental performance of the LLNL gun with a simple model and with predictions of a magnetohydrodynamics code

  19. Return-to-work of sick-listed workers without an employment contract--what works?

    Science.gov (United States)

    Vermeulen, Sylvia J; Tamminga, Sietske J; Schellart, Antonius Jm; Ybema, Jan Fekke; Anema, Johannes R

    2009-07-14

    In the past decade flexible labour market arrangements have emerged as a significant change in the European Union labour market. Studies suggest that these new types of labour arrangements may be linked to ill health, an increased risk for work disability, and inadequate vocational rehabilitation. Therefore, the objectives of this study were: 1. to examine demographic characteristics of workers without an employment contract sick-listed for at least 13 weeks, 2. to describe the content and frequency of occupational health care (OHC) interventions for these sick-listed workers, and 3. to examine OHC interventions as possible determinants for return-to-work (RTW) of these workers. A cohort of 1077 sick-listed workers without an employment contract were included at baseline, i.e. 13 weeks after reporting sick. Demographic variables were available at baseline. Measurement of cross-sectional data took place 4-6 months after inclusion. Primary outcome measures were: frequency of OHC interventions and RTW-rates. Measured confounding variables were: gender, age, type of worker (temporary agency worker, unemployed worker, or remaining worker without employment contract), level of education, reason for absenteeism (diagnosis), and perceived health. The association between OHC interventions and RTW was analysed with a logistic multiple regression analysis. At 7-9 months after the first day of reporting sick only 19% of the workers had (partially or completely) returned to work, and most workers perceived their health as fairly poor or poor. The most frequently reported (49%) intervention was 'the OHC professional discussed RTW'. However, the intervention 'OHC professional made and discussed a RTW action plan' was reported by only 19% of the respondents. The logistic multiple regression analysis showed a significant positive association between RTW and the interventions: 'OHC professional discussed RTW'; and 'OHC professional made and discussed a RTW action plan'. The

  20. Dynamics of psychological contracts with work engagement and turnover intention: the influence of organizational tenure

    NARCIS (Netherlands)

    Bal, P.M.; de Cooman, R.; Mol, S.T.

    2013-01-01

    This study investigated the interrelations of the psychological contract with work engagement and turnover intention, which has hitherto been a largely overlooked topic in psychological contract research. Although previous research has mainly focused on how psychological contracts influence job

  1. Performance of HEPA filters at LLNL following the 1980 and 1989 earthquakes

    International Nuclear Information System (INIS)

    Bergman, W.; Elliott, J.; Wilson, K.

    1995-01-01

    The Lawrence Livermore National Laboratory has experienced two significant earthquakes for which data is available to assess the ability of HEPA filters to withstand seismic conditions. A 5.9 magnitude earthquake with an epicenter 10 miles from LLNL struck on January 24, l980. Estimates of the peak ground accelerations ranged from 0.2 to 0.3 g. A 7.0 magnitude earthquake with an epicenter about 50 miles from LLNL struck on October 17, 1989. Measurements of the ground accelerations at LLNL averaged 0.1 g. The results from the in-place filter tests obtained after each of the earthquakes were compiled and studied to determine if the earthquakes had caused filter leakage. Our study showed that only the 1980 earthquake resulted in a small increase in the number of HEPA filters developing leaks. In the 12 months following the 1980 and 1989 earthquakes, the in-place filter tests showed 8.0% and 4.1% of all filters respectively developed leaks. The average percentage of filters developing leaks from 1980 to 1993 was 3.3%+/-1.7%. The increase in the filter leaks is significant for the 1980 earthquake, but not for the 1989 earthquake. No contamination was detected following the earthquakes that would suggest transient releases from the filtration system

  2. Performance of HEPA filters at LLNL following the 1980 and 1989 earthquakes

    Energy Technology Data Exchange (ETDEWEB)

    Bergman, W.; Elliott, J.; Wilson, K. [Lawrence Livermore National Laboratory, CA (United States)

    1995-02-01

    The Lawrence Livermore National Laboratory has experienced two significant earthquakes for which data is available to assess the ability of HEPA filters to withstand seismic conditions. A 5.9 magnitude earthquake with an epicenter 10 miles from LLNL struck on January 24, l980. Estimates of the peak ground accelerations ranged from 0.2 to 0.3 g. A 7.0 magnitude earthquake with an epicenter about 50 miles from LLNL struck on October 17, 1989. Measurements of the ground accelerations at LLNL averaged 0.1 g. The results from the in-place filter tests obtained after each of the earthquakes were compiled and studied to determine if the earthquakes had caused filter leakage. Our study showed that only the 1980 earthquake resulted in a small increase in the number of HEPA filters developing leaks. In the 12 months following the 1980 and 1989 earthquakes, the in-place filter tests showed 8.0% and 4.1% of all filters respectively developed leaks. The average percentage of filters developing leaks from 1980 to 1993 was 3.3%+/-1.7%. The increase in the filter leaks is significant for the 1980 earthquake, but not for the 1989 earthquake. No contamination was detected following the earthquakes that would suggest transient releases from the filtration system.

  3. 18 CFR 367.4160 - Account 416, Costs and expenses of merchandising, jobbing and contract work.

    Science.gov (United States)

    2010-04-01

    ... expenses of merchandising, jobbing and contract work. 367.4160 Section 367.4160 Conservation of Power and... § 367.4160 Account 416, Costs and expenses of merchandising, jobbing and contract work. (a) This account... sales rooms. (8) Maintaining display counters and other equipment used in merchandising. (9) Arranging...

  4. The design and implementation of the LLNL gigabit testbed

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, D. [Lawrence Livermore National Labs., CA (United States)

    1994-12-01

    This paper will look at the design and implementation of the LLNL Gigabit testbed (LGTB), where various high speed networking products, can be tested in one environment. The paper will discuss the philosophy behind the design of and the need for the testbed, the tests that are performed in the testbed, and the tools used to implement those tests.

  5. Level-1 Milestone 350 Definitions v1

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, T

    2006-11-17

    This milestone is the direct result of work that started seven years ago with the planning for a 100-teraFLOP platform and will be satisfied when 100 teraFLOPS is placed in operation and readied for Stockpile Stewardship Program simulations. The end product of this milestone will be a production-level, high-performance computing system, code named Purple, designed to be used to solve the most demanding stockpile stewardship problems, that is, the large-scale application problems at the edge of our understanding of weapon physics. This fully functional 100 teraFLOPS system must be able to serve a diverse scientific and engineering workload. It must also have a robust code development and production environment, both of which facilitate the workload requirements. This multi-year effort includes major activities in contract management, facilities, infrastructure, system software, and user environment and support. Led by LLNL, the trilabs defined the statement of work for a 100-teraFLOP system that resulted in a contract with IBM known as the Purple contract. LLNL worked with IBM throughout the contract period to resolve issues and collaborated with the Program to resolve contractual issues to ensure delivery of a platform that best serves the Program for a reasonable cost. The Purple system represents a substantial increase in the classified compute resources at LLNL for NNSA. The center computer environment must be designed to accept the Purple system and to scale with the increase of compute resources to achieve required end-to-end services. Networking, archival storage, visualization servers, global file systems, and system software will all be enhanced to support Purple's size and architecture. IBM and LLNL are sharing responsibility for Purple's system software. LLNL is responsible for the scheduler, resource manager, and some code development tools. Through the Purple contract, IBM is responsible for the remainder of the system software including the

  6. Comprehensive Angular Response Study of LLNL Panasonic Dosimeter Configurations and Artificial Intelligence Algorithm

    Energy Technology Data Exchange (ETDEWEB)

    Stone, D. K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-06-30

    In April of 2016, the Lawrence Livermore National Laboratory External Dosimetry Program underwent a Department of Energy Laboratory Accreditation Program (DOELAP) on-site assessment. The assessment reported a concern that the study performed in 2013 Angular Dependence Study Panasonic UD-802 and UD-810 Dosimeters LLNL Artificial Intelligence Algorithm was incomplete. Only the responses at ±60° and 0° were evaluated and independent data from dosimeters was not used to evaluate the algorithm. Additionally, other configurations of LLNL dosimeters were not considered in this study. This includes nuclear accident dosimeters (NAD) which are placed in the wells surrounding the TLD in the dosimeter holder.

  7. M4FT-15LL0806062-LLNL Thermodynamic and Sorption Data FY15 Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Zavarin, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wolery, T. J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-08-31

    This progress report (Milestone Number M4FT-15LL0806062) summarizes research conducted at Lawrence Livermore National Laboratory (LLNL) within Work Package Number FT-15LL080606. The focus of this research is the thermodynamic modeling of Engineered Barrier System (EBS) materials and properties and development of thermodynamic databases and models to evaluate the stability of EBS materials and their interactions with fluids at various physicochemical conditions relevant to subsurface repository environments. The development and implementation of equilibrium thermodynamic models are intended to describe chemical and physical processes such as solubility, sorption, and diffusion.

  8. Return-to-work of sick-listed workers without an employment contract – what works?

    Science.gov (United States)

    Vermeulen, Sylvia J; Tamminga, Sietske J; Schellart, Antonius JM; Ybema, Jan Fekke; Anema, Johannes R

    2009-01-01

    Background In the past decade flexible labour market arrangements have emerged as a significant change in the European Union labour market. Studies suggest that these new types of labour arrangements may be linked to ill health, an increased risk for work disability, and inadequate vocational rehabilitation. Therefore, the objectives of this study were: 1. to examine demographic characteristics of workers without an employment contract sick-listed for at least 13 weeks, 2. to describe the content and frequency of occupational health care (OHC) interventions for these sick-listed workers, and 3. to examine OHC interventions as possible determinants for return-to-work (RTW) of these workers. Methods A cohort of 1077 sick-listed workers without an employment contract were included at baseline, i.e. 13 weeks after reporting sick. Demographic variables were available at baseline. Measurement of cross-sectional data took place 4–6 months after inclusion. Primary outcome measures were: frequency of OHC interventions and RTW-rates. Measured confounding variables were: gender, age, type of worker (temporary agency worker, unemployed worker, or remaining worker without employment contract), level of education, reason for absenteeism (diagnosis), and perceived health. The association between OHC interventions and RTW was analysed with a logistic multiple regression analysis. Results At 7–9 months after the first day of reporting sick only 19% of the workers had (partially or completely) returned to work, and most workers perceived their health as fairly poor or poor. The most frequently reported (49%) intervention was 'the OHC professional discussed RTW'. However, the intervention 'OHC professional made and discussed a RTW action plan' was reported by only 19% of the respondents. The logistic multiple regression analysis showed a significant positive association between RTW and the interventions: 'OHC professional discussed RTW'; and 'OHC professional made and discussed a

  9. Return-to-work of sick-listed workers without an employment contract – what works?

    Directory of Open Access Journals (Sweden)

    Schellart Antonius JM

    2009-07-01

    Full Text Available Abstract Background In the past decade flexible labour market arrangements have emerged as a significant change in the European Union labour market. Studies suggest that these new types of labour arrangements may be linked to ill health, an increased risk for work disability, and inadequate vocational rehabilitation. Therefore, the objectives of this study were: 1. to examine demographic characteristics of workers without an employment contract sick-listed for at least 13 weeks, 2. to describe the content and frequency of occupational health care (OHC interventions for these sick-listed workers, and 3. to examine OHC interventions as possible determinants for return-to-work (RTW of these workers. Methods A cohort of 1077 sick-listed workers without an employment contract were included at baseline, i.e. 13 weeks after reporting sick. Demographic variables were available at baseline. Measurement of cross-sectional data took place 4–6 months after inclusion. Primary outcome measures were: frequency of OHC interventions and RTW-rates. Measured confounding variables were: gender, age, type of worker (temporary agency worker, unemployed worker, or remaining worker without employment contract, level of education, reason for absenteeism (diagnosis, and perceived health. The association between OHC interventions and RTW was analysed with a logistic multiple regression analysis. Results At 7–9 months after the first day of reporting sick only 19% of the workers had (partially or completely returned to work, and most workers perceived their health as fairly poor or poor. The most frequently reported (49% intervention was 'the OHC professional discussed RTW'. However, the intervention 'OHC professional made and discussed a RTW action plan' was reported by only 19% of the respondents. The logistic multiple regression analysis showed a significant positive association between RTW and the interventions: 'OHC professional discussed RTW'; and 'OHC

  10. LLNL Site plan for a MOX fuel lead assembly mission in support of surplus plutonium disposition

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, M.C.

    1997-10-01

    The principal facilities that LLNL would use to support a MOX Fuel Lead Assembly Mission are Building 332 and Building 334. Both of these buildings are within the security boundary known as the LLNL Superblock. Building 332 is the LLNL Plutonium Facility. As an operational plutonium facility, it has all the infrastructure and support services required for plutonium operations. The LLNL Plutonium Facility routinely handles kilogram quantities of plutonium and uranium. Currently, the building is limited to a plutonium inventory of 700 kilograms and a uranium inventory of 300 kilograms. Process rooms (excluding the vaults) are limited to an inventory of 20 kilograms per room. Ongoing operations include: receiving SSTS, material receipt, storage, metal machining and casting, welding, metal-to-oxide conversion, purification, molten salt operations, chlorination, oxide calcination, cold pressing and sintering, vitrification, encapsulation, chemical analysis, metallography and microprobe analysis, waste material processing, material accountability measurements, packaging, and material shipping. Building 334 is the Hardened Engineering Test Building. This building supports environmental and radiation measurements on encapsulated plutonium and uranium components. Other existing facilities that would be used to support a MOX Fuel Lead Assembly Mission include Building 335 for hardware receiving and storage and TRU and LLW waste storage and shipping facilities, and Building 331 or Building 241 for storage of depleted uranium.

  11. LLNL Site plan for a MOX fuel lead assembly mission in support of surplus plutonium disposition

    International Nuclear Information System (INIS)

    Bronson, M.C.

    1997-01-01

    The principal facilities that LLNL would use to support a MOX Fuel Lead Assembly Mission are Building 332 and Building 334. Both of these buildings are within the security boundary known as the LLNL Superblock. Building 332 is the LLNL Plutonium Facility. As an operational plutonium facility, it has all the infrastructure and support services required for plutonium operations. The LLNL Plutonium Facility routinely handles kilogram quantities of plutonium and uranium. Currently, the building is limited to a plutonium inventory of 700 kilograms and a uranium inventory of 300 kilograms. Process rooms (excluding the vaults) are limited to an inventory of 20 kilograms per room. Ongoing operations include: receiving SSTS, material receipt, storage, metal machining and casting, welding, metal-to-oxide conversion, purification, molten salt operations, chlorination, oxide calcination, cold pressing and sintering, vitrification, encapsulation, chemical analysis, metallography and microprobe analysis, waste material processing, material accountability measurements, packaging, and material shipping. Building 334 is the Hardened Engineering Test Building. This building supports environmental and radiation measurements on encapsulated plutonium and uranium components. Other existing facilities that would be used to support a MOX Fuel Lead Assembly Mission include Building 335 for hardware receiving and storage and TRU and LLW waste storage and shipping facilities, and Building 331 or Building 241 for storage of depleted uranium

  12. Physics of laser fusion. Volume II. Diagnostics of experiments on laser fusion targets at LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Ahlstrom, H.G.

    1982-01-01

    These notes present the experimental basis and status for laser fusion as developed at LLNL. There are two other volumes in this series: Vol. I, by C.E. Max, presents the theoretical laser-plasma interaction physics; Vol. III, by J.F. Holzrichter et al., presents the theory and design of high-power pulsed lasers. A fourth volume will present the theoretical implosion physics. The notes consist of six sections. The first, an introductory section, provides some of the history of inertial fusion and a simple explanation of the concepts involved. The second section presents an extensive discussion of diagnostic instrumentation used in the LLNL Laser Fusion Program. The third section is a presentation of laser facilities and capabilities at LLNL. The purpose here is to define capability, not to derive how it was obtained. The fourth and fifth sections present the experimental data on laser-plasma interaction and implosion physics. The last chapter is a short projection of the future.

  13. Physics of laser fusion. Volume II. Diagnostics of experiments on laser fusion targets at LLNL

    International Nuclear Information System (INIS)

    Ahlstrom, H.G.

    1982-01-01

    These notes present the experimental basis and status for laser fusion as developed at LLNL. There are two other volumes in this series: Vol. I, by C.E. Max, presents the theoretical laser-plasma interaction physics; Vol. III, by J.F. Holzrichter et al., presents the theory and design of high-power pulsed lasers. A fourth volume will present the theoretical implosion physics. The notes consist of six sections. The first, an introductory section, provides some of the history of inertial fusion and a simple explanation of the concepts involved. The second section presents an extensive discussion of diagnostic instrumentation used in the LLNL Laser Fusion Program. The third section is a presentation of laser facilities and capabilities at LLNL. The purpose here is to define capability, not to derive how it was obtained. The fourth and fifth sections present the experimental data on laser-plasma interaction and implosion physics. The last chapter is a short projection of the future

  14. Proposal for the award of an industrial support contract for indoor fitting work at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for indoor fitting work (carpentry, glazing, venetian and roller blinds) at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm ROLAND COSTA MENUISERIE (CH), the lowest bidder, for the provision of indoor fitting work at CERN, for three years for a total amount not exceeding 1 213 403 Swiss francs, not subject to revision for two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  15. The impact of environmental stressors and types of work contract on occupational stress.

    Science.gov (United States)

    Corrêa, Ana Paula; Ferreira, Maria Cristina

    2011-05-01

    This study aimed to investigate the impact of seven environmental stressors (role conflict, work overload, interpersonal difficulties, work-family conflict, work instability, lack of autonomy and pressure of responsibility) and the nature of the employment contract (permanent or atypical) on three psychological reactions to occupational stress (job satisfaction, positive emotions, and negative emotions at work). 305 Brazilian workers from both sexes participated in this research, distributed between permanent and atypical workers. The results showed that the role conflict and the work overload had a negative impact on job satisfaction. The role conflict had a negative impact on the positive emotions at work, while the pressure of responsibility interfered positively in it. The work overload interfered positively in the negative emotions at work, while the pressure of responsibility interfered negatively in it. The type of contract did not affect significantly any one of the dependent variables. The implications of the results for future research are discussed.

  16. Impact of employment contract changes on workers' quality of working life, job insecurity, health and work-related attitudes

    NARCIS (Netherlands)

    Wagenaar, A.F.; Kompier, M.A.J.; Houtman, I.L.D.; Bossche, S.N.J.van den; Taris, T.W.

    2012-01-01

    Objectives: Changes in employment contracts may impact the quality of working life, job insecurity, health and work-related attitudes. We examined the validity of two partly competing theoretical approaches. Based upon a segmentation approach, we expected no change in scores among stable

  17. LLNL radioactive waste management plan as per DOE Order 5820.2

    International Nuclear Information System (INIS)

    1984-01-01

    The following aspects of LLNL's radioactive waste management plan are discussed: program administration; description of waste generating processes; radioactive waste collection, treatment, and disposal; sanitary waste management; site 300 operations; schedules and major milestones for waste management activities; and environmental monitoring programs (sampling and analysis)

  18. Proposal for the award of an industrial support contract for minor civil-engineering work at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for minor civil-engineering work at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm LOSINGER CONSTRUCTION (CH), the lowest bidder, for the provision of minor civilengineering work at CERN for three years for a total amount not exceeding 2 840 278 Swiss francs, not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  19. 48 CFR 227.7107-2 - Contracts for construction supplies and research and development work.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contracts for construction supplies and research and development work. 227.7107-2 Section 227.7107-2 Federal Acquisition Regulations... PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7107-2 Contracts for construction supplies and...

  20. Report on the B-Fields at NIF Workshop Held at LLNL October 12-13, 2015

    International Nuclear Information System (INIS)

    Fournier, K. B.; Moody, J. D.

    2015-01-01

    A national ICF laboratory workshop on requirements for a magnetized target capability on NIF was held by NIF at LLNL on October 12 and 13, attended by experts from LLNL, SNL, LLE, LANL, GA, and NRL. Advocates for indirect drive (LLNL), magnetic (Z) drive (SNL), polar direct drive (LLE), and basic science needing applied B (many institutions) presented and discussed requirements for the magnetized target capabilities they would like to see. 30T capability was most frequently requested. A phased operation increasing the field in steps experimentally can be envisioned. The NIF management will take the inputs from the scientific community represented at the workshop and recommend pulse-powered magnet parameters for NIF that best meet the collective user requests. In parallel, LLNL will continue investigating magnets for future generations that might be powered by compact laser-B-field generators (Moody, Fujioka, Santos, Woolsey, Pollock). The NIF facility engineers will start to analyze compatibility of the recommended pulsed magnet parameters (size, field, rise time, materials) with NIF chamber constraints, diagnostic access, and final optics protection against debris in FY16. The objective of this assessment will be to develop a schedule for achieving an initial Bfield capability. Based on an initial assessment, room temperature magnetized gas capsules will be fielded on NIF first. Magnetized cryo-ice-layered targets will take longer (more compatibility issues). Magnetized wetted foam DT targets (Olson) may have somewhat fewer compatibility issues making them a more likely choice for the first cryo-ice-layered target fielded with applied Bz.

  1. Permanent Temporariness? Changes in Social Contracts in Knowledge Work

    Directory of Open Access Journals (Sweden)

    Bente Rasmussen

    2012-02-01

    Full Text Available Many sociologists have argued that work no longer plays the central role in contemporary life experience because we have entered an age of insecurity in relation to employment, and knowledge workers are often pictured as egoistical portfolio workers who are only interested in their careers and no longer loyal to their employers. Cappelli (1999 on the other hand argues that more insecure employment relations is a result of employers’ strategy to buy workers rather than offering them long-term relations. Using case studies from seven different knowledge work contexts in Norway, this article argues that more temporary employment relations is not the result of career-seeking portfolio workers, but of changes in employment practices of their employers. These are not primarily changes in the formal employment contracts from permanent to temporary employment, but in the social contracts as they are practiced by the employers and experienced by the knowledge workers in the different contexts of knowledge work. The reason for more temporary relations was not because work does not matter for knowledge workers. On the contrary, we found that they accepted insecure conditions because work mattered and because they were eager to take on new tasks, learn the trade in new fields, and show that they were able to do the job. When they left their employer, it was because they were not able to do a good job in their positions or because they were increasingly directly exposed to an insecure market that signaled that they were not profitable (enough for their employer. Although changes in employment practices by the employers toward more short-term relations are not caused by disloyal portfolio workers, these practices may produce the problem of disloyal workers who have to secure their employment in the labor market.

  2. Beam-beam studies for the proposed SLAC/LBL/LLNL B Factory

    International Nuclear Information System (INIS)

    Furman, M.A.

    1991-05-01

    We present a summary of beam-beam dynamics studies that have been carried out to date for the proposed SLAC/LBL/LLNL B Factory. Most of the material presented here is contained in the proposal's Conceptual Design Report, although post-CDR studies are also presented. 15 refs., 6 figs., 2 tabs

  3. Seismic evaluation of the LLNL plutonium facility (Building 332)

    International Nuclear Information System (INIS)

    Hall, W.J.; Sozen, M.A.

    1982-03-01

    The expected performance of the Lawrence Livermore National Laboratory (LLNL) Plutonium Facility (Building 332) subjected to earthquake ground motion has been evaluated. Anticipated behavior of the building, glove boxes, ventilation system and other systems critical for containment of plutonium is described for three severe postulated earthquake excitations. Based upon this evaluation, some damage to the building, glove boxes and ventilation system would be expected but no collapse of any structure is anticipated as a result of the postulated earthquake ground motions

  4. Book-Smart, Not Street-Smart: Blockchain-Based Smart Contracts and The Social Workings of Law

    Directory of Open Access Journals (Sweden)

    Karen E. C. Levy

    2017-02-01

    Full Text Available This paper critiques blockchain-based “smart contracts,” which aim to automatically and securely execute obligations without reliance on a centralized enforcement authority. Though smart contracts do have some features that might serve the goals of social justice and fairness, I suggest that they are based on a thin conception of what law does, and how it does it. Smart contracts focus on the technical form of contract to the exclusion of the social contexts within which contracts operate, and the complex ways in which people use them. In the real world, contractual obligations are enforced through all kinds of social mechanisms other than formal adjudication—and contracts serve many functions that are not explicitly legal in nature, or even designed to be formally enforced. I describe three categories of contracting practices in which people engage (the inclusion of facially unenforceable terms, the inclusion of purposefully underspecified terms, and willful nonenforcement of enforceable terms to illustrate how contracts actually “work.” The technology of smart contracts neglects the fact that people use contracts as social resources to manage their relations. The inflexibility that they introduce, by design, might short-circuit a number of social uses to which law is routinely put. Therefore, I suggest that attention to the social and relational contexts of contracting are essential considerations for the discussion, development, and deployment of smart contracts.

  5. Institute of Geophysics and Planetary Physics (IGPP), Lawrence Livermore National Laboratory (LLNL): Quinquennial report, November 14-15, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Tweed, J.

    1996-10-01

    This Quinquennial Review Report of the Lawrence Livermore National Laboratory (LLNL) branch of the Institute for Geophysics and Planetary Physics (IGPP) provides an overview of IGPP-LLNL, its mission, and research highlights of current scientific activities. This report also presents an overview of the University Collaborative Research Program (UCRP), a summary of the UCRP Fiscal Year 1997 proposal process and the project selection list, a funding summary for 1993-1996, seminars presented, and scientific publications. 2 figs., 3 tabs.

  6. Performance Analysis: Work Control Events Identified January - August 2010

    Energy Technology Data Exchange (ETDEWEB)

    De Grange, C E; Freeman, J W; Kerr, C E; Holman, G; Marsh, K; Beach, R

    2011-01-14

    This performance analysis evaluated 24 events that occurred at LLNL from January through August 2010. The analysis identified areas of potential work control process and/or implementation weaknesses and several common underlying causes. Human performance improvement and safety culture factors were part of the causal analysis of each event and were analyzed. The collective significance of all events in 2010, as measured by the occurrence reporting significance category and by the proportion of events that have been reported to the DOE ORPS under the ''management concerns'' reporting criteria, does not appear to have increased in 2010. The frequency of reporting in each of the significance categories has not changed in 2010 compared to the previous four years. There is no change indicating a trend in the significance category and there has been no increase in the proportion of occurrences reported in the higher significance category. Also, the frequency of events, 42 events reported through August 2010, is not greater than in previous years and is below the average of 63 occurrences per year at LLNL since 2006. Over the previous four years, an average of 43% of the LLNL's reported occurrences have been reported as either ''management concerns'' or ''near misses.'' In 2010, 29% of the occurrences have been reported as ''management concerns'' or ''near misses.'' This rate indicates that LLNL is now reporting fewer ''management concern'' and ''near miss'' occurrences compared to the previous four years. From 2008 to the present, LLNL senior management has undertaken a series of initiatives to strengthen the work planning and control system with the primary objective to improve worker safety. In 2008, the LLNL Deputy Director established the Work Control Integrated Project Team to develop the core requirements and graded

  7. 21 CFR 14.15 - Committees working under a contract with FDA.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Committees working under a contract with FDA. 14.15 Section 14.15 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... committee: (1) The committee shall give public notice of its meetings and agenda, and provide interested...

  8. The role of CERN in the large construction contracts for LHC civil works

    CERN Document Server

    D'Aça-Castel-Branco, P

    1998-01-01

    The contracts for the civil engineering construction of the LHC are based upon the standard FIDIC (Fédération Internationale des Ingénieurs Conseils) document entitled "Conditions of Contract for Works of Civil Engineering Construction". FIDIC is a reputable supra-national and world-wide Federation of Consulting Engineers focused on the definition and regulation of the role of many parties involved with the International Construction Industry. An overview of FIDIC's and other Organizations', such as the World Bank, standard documents is presented. The difference between standard Contract documents and standard Bidding documents is pointed out. In view of CERN's status as an intergovernmental Organization, the original FIDIC standard documents needed to be adapted. The modifications are identified and explained. A concise definition of the role of each party concerned by the LHC construction Contracts, i.e. the Contractor, the Engineer and the Client (CERN), is made. Finally, a brief cost-benefit analysis o...

  9. 13 CFR 126.700 - What are the performance of work requirements for HUBZone contracts?

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the performance of work... ADMINISTRATION HUBZONE PROGRAM Contract Performance Requirements § 126.700 What are the performance of work... meet the performance of work requirements set forth in § 125.6(c) of this chapter. (b) In addition to...

  10. Over Batch Analysis for the LLNL Plutonium Packaging System (PuPS)

    International Nuclear Information System (INIS)

    Riley, D.; Dodson, K.

    2007-01-01

    This document addresses the concern raised in the Savannah River Site (SRS) Acceptance Criteria (Reference 1, Section 6.a.3) about receiving an item that is over batched by 1.0 kg of fissile materials. This document shows that the occurrence of this is incredible. Some of the Department of Energy Standard 3013 (DOE-STD-3013) requirements are described in Section 2.1. The SRS requirement is discussed in Section 2.2. Section 2.3 describes the way fissile materials are handled in the Lawrence Livermore National Laboratory (LLNL) Plutonium Facility (B332). Based on the material handling discussed in Section 2.3, there are only three errors that could result in a shipping container being over batched. These are: incorrect measurement of the item, selecting the wrong item to package, and packaging two items into a single shipping container. The analysis in Section 3 shows that the first two events are incredible because of the controls that exist at LLNL. The third event is physically impossible. Therefore, it is incredible for an item to be shipped to SRS that is more than 1.0 kg of fissile materials over batched

  11. Over Batch Analysis for the LLNL DOE-STD-3013 Packaging System

    International Nuclear Information System (INIS)

    Riley, D.C.; Dodson, K.

    2009-01-01

    This document addresses the concern raised in the Savannah River Site (SRS) Acceptance Criteria about receiving an item that is over batched by 1.0 kg of fissile materials. This document shows that the occurrence of this is incredible. Some of the Department of Energy Standard 3013 (DOE-STD-3013) requirements are described in Section 2.1. The SRS requirement is discussed in Section 2.2. Section 2.3 describes the way fissile materials are handled in the Lawrence Livermore National Laboratory (LLNL) Plutonium Facility (B332). Based on the material handling discussed in Section 2.3, there are only three errors that could result in a shipping container being over batched. These are: incorrect measurement of the item, selecting the wrong item to package, and packaging two items into a single shipping container. The analysis in Section 3 shows that the first two events are incredible because of the controls that exist at LLNL. The third event is physically impossible. Therefore, it is incredible for an item to be shipped to SRS that is more than 1.0 kg of fissile materials over batched.

  12. Employment contracts: Cross-sectional and longitudinal relations with quality of working life, health and well-being

    NARCIS (Netherlands)

    Kompier, M.; Ybema, J.F.; Janssen, J.; Taris, T.

    2009-01-01

    Objectives: The aim of this study was to enhance (i) insight in the relationship between different types of employment contract and the quality of working life, health and well-being, and (ii) our causal understanding of these relationships by comparing employees whose contract type changes across

  13. Are Emotions Transmitted From Work to Family? A Crossover Model of Psychological Contract Breach.

    Science.gov (United States)

    Liang, Huai-Liang

    2018-01-01

    Based on affective events theory and the crossover model, this study examines the effect of psychological contract breach on employee dysfunctional behavior and partner family undermining and explores the crossover effect of employee dysfunctional behavior on partner family undermining in work-family issues. This study collected 370 employee-partner dyads (277 male employees, 93 female employees, M age = 43.59 years) from a large manufacturing organization. The results of this study support the conception that employees' psychological contract breach results in frustration in the workplace. In addition, mediation analysis results reveal that psychological contract breach relates to employee dysfunctional behavior in the workplace. The findings show that partners' psychological strain mediates the relationship between employee dysfunctional behavior and partner family undermining. Furthermore, these findings provide investigations for the crossover model to display the value of psychological contract breach in family issues.

  14. Custodial Contracting -- How It Worked in One District

    Science.gov (United States)

    Law, James E.

    1975-01-01

    Presents a specific explanation of one school's successful application of custodial contracting. Describes the advantages and disadvantages of the program and provides a sample custodial contract. (Author/DN)

  15. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  16. FY14 LLNL OMEGA Experimental Programs

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fournier, K. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Baker, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Barrios, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bernstein, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Brown, G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Celliers, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Chen, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Coppari, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fratanduono, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Johnson, M. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Huntington, C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jenei, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kraus, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ma, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martinez, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNabb, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Millot, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Moore, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Nagel, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Park, H. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Patel, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Perez, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ping, Y. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pollock, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ross, J. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rygg, J. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Zylstra, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Collins, G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Landen, O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wan, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hsing, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-10-13

    In FY14, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 324 target shots in FY14, with 246 shots using just the OMEGA laser system, 62 shots using just the EP laser system, and 16 Joint shots using Omega and EP together. Approximately 31% of the total number of shots (62 OMEGA shots, 42 EP shots) shots supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 69% (200 OMEGA shots and 36 EP shots, including the 16 Joint shots) were dedicated to experiments for High- Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.

  17. FY15 LLNL OMEGA Experimental Programs

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Baker, K. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Barrios, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Beckwith, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Casey, D. T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Celliers, P. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Chen, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Coppari, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fournier, K. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fratanduono, D. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Frenje, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Huntington, C. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kraus, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lazicki, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martinez, D. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNaney, J. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Millot, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pak, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Park, H. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ping, Y. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pollock, B. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wehrenberg, C. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Widmann, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Collins, G. W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Landen, O. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wan, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hsing, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-12-04

    In FY15, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 468 target shots in FY15, with 315 shots using just the OMEGA laser system, 145 shots using just the EP laser system, and 8 Joint shots using Omega and EP together. Approximately 25% of the total number of shots (56 OMEGA shots and 67 EP shots, including the 8 Joint shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 75% (267 OMEGA shots and 86 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.

  18. Ideational struggles over women's part-time work in Norway: Destabilizing the gender contract

    OpenAIRE

    Ellingsæter, Anne Lise; Mosesdottir, Lilja

    2017-01-01

    High rates of part-time work have been associated with high female employment rates in the Nordic countries, except for Finland. Part-time work has played a key role in the modification of the male breadwinner gender contract by enabling women to enter paid work while continuing to take on the main domestic responsibilities. Previously tacit and little disputed, this ‘normalization’ of women’s part-time work has increasingly become a contentious issue in the public debate in Norway, both in t...

  19. DOE/LLNL verification symposium on technologies for monitoring nuclear tests related to weapons proliferation

    International Nuclear Information System (INIS)

    Nakanishi, K.K.

    1993-01-01

    The rapidly changing world situation has raised concerns regarding the proliferation of nuclear weapons and the ability to monitor a possible clandestine nuclear testing program. To address these issues, Lawrence Livermore National Laboratory's (LLNL) Treaty Verification Program sponsored a symposium funded by the US Department of Energy's (DOE) Office of Arms Control, Division of Systems and Technology. The DOE/LLNL Symposium on Technologies for Monitoring Nuclear Tests Related to Weapons Proliferation was held at the DOE's Nevada Operations Office in Las Vegas, May 6--7,1992. This volume is a collection of several papers presented at the symposium. Several experts in monitoring technology presented invited talks assessing the status of monitoring technology with emphasis on the deficient areas requiring more attention in the future. In addition, several speakers discussed proliferation monitoring technologies being developed by the DOE's weapons laboratories

  20. Micro and small firms contracted the works of third sector contracting and public

    Directory of Open Access Journals (Sweden)

    Daniela Juliano Silva

    2015-06-01

    Full Text Available In a scenario of successive changes, we are faced today with a "new" State of design (First Sector subsidiary and developer, embracing new contracting models, involving private non-profit institutions (Third Sector ahead of social services relevance (health, education, technology, among others. To comply with the obligations entered into with the public entity (end-obligations, this Third Sector performs hires (to perform their half-bonds with the second sector (market, where they operate Micro and Small Businesses. This study aims a reflective look at these contracts, usually the result of simplified bidding process in order to verify their specificities and whether they take place in compliance with the prerogatives and differential treatment meted especially those business companies (art. 170, X, SC / 1988. In this endeavor, it was decided, besides a literature review by an investigative approach from the point of view of three different social organizations that have management contracts in health care with public entities and therefore have signed contracts with ME and EPP for the fulfillment of their obligations to the government.      

  1. Sandia National Laboratories: Working with Sandia: Contract Audit

    Science.gov (United States)

    Defense Systems & Assessments About Defense Systems & Assessments Program Areas Accomplishments Audit Sandia's Economic Impact Licensing & Technology Transfer Browse Technology Portfolios Audit iSupplier Account Accounts Payable Contract Information Construction and Facilities Contract Audit

  2. 20 CFR 655.185 - Job service complaint system; enforcement of work contracts.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Job service complaint system; enforcement of... Job service complaint system; enforcement of work contracts. (a) Filing with DOL. Complaints arising under this subpart must be filed through the Job Service Complaint System, as described in 20 CFR part...

  3. Proposed LLNL electron beam ion trap

    International Nuclear Information System (INIS)

    Marrs, R.E.; Egan, P.O.; Proctor, I.; Levine, M.A.; Hansen, L.; Kajiyama, Y.; Wolgast, R.

    1985-01-01

    The interaction of energetic electrons with highly charged ions is of great importance to several research fields such as astrophysics, laser fusion and magnetic fusion. In spite of this importance there are almost no measurements of electron interaction cross sections for ions more than a few times ionized. To address this problem an electron beam ion trap (EBIT) is being developed at LLNL. The device is essentially an EBIS except that it is not intended as a source of extracted ions. Instead the (variable energy) electron beam interacting with the confined ions will be used to obtain measurements of ionization cross sections, dielectronic recombination cross sections, radiative recombination cross sections, energy levels and oscillator strengths. Charge-exchange recombinaion cross sections with neutral gasses could also be measured. The goal is to produce and study elements in many different charge states up to He-like xenon and Ne-like uranium. 5 refs., 2 figs

  4. Proposals for ORNL [Oak Ridge National Laboratory] support to Tiber LLNL [Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Berry, L.A.; Rosenthal, M.W.; Saltmarsh, M.J.; Shannon, T.E.; Sheffield, J.

    1987-01-01

    This document describes the interests and capabilities of Oak Ridge National Laboratory in their proposals to support the Lawrence Livermore National Laboratory (LLNL) Engineering Test Reactor (ETR) project. Five individual proposals are cataloged separately. (FI)

  5. Release isentrope measurements with the LLNL electric gun

    Energy Technology Data Exchange (ETDEWEB)

    Gathers, G.R.; Osher, J.E.; Chau, H.H.; Weingart, R.C.; Lee, C.G.; Diaz, E.

    1987-06-01

    The liquid-vapor coexistence boundary is not well known for most metals because the extreme conditions near the critical point create severe experimental difficulties. The isentropes passing through the liquid-vapor region typically begin from rather large pressures on the Hugoniot. We are attempting to use the high velocities achievable with the Lawrence Livermore National Laboratory (LLNL) electric gun to obtain these extreme states in aluminum and measure the release isentropes by releasing into a series of calibrated standards with known Hugoniots. To achieve large pressure drops needed to explore the liquid-vapor region, we use argon gas for which Hugoniots have been calculated using the ACTEX code, as one of the release materials.

  6. 29 CFR 5.15 - Limitations, variations, tolerances, and exemptions under the Contract Work Hours and Safety...

    Science.gov (United States)

    2010-07-01

    ... minimum hourly wage required under the contract pursuant to the provisions of the Service Contract Act of... premium payment of one-half times such minimum hourly wage for all hours worked in excess of 40 hours in... this section are met. (ii) The apprentice or trainee comes within the definition contained in § 5.2(n...

  7. PERCEPTIONS OF THE PSYHOLOGICAL CONTRACT IN WORKING LIFEAND AN APPLICATION IN THE SERVICE SECTOR

    Directory of Open Access Journals (Sweden)

    Şenol Yaprak

    2016-07-01

    Full Text Available Unlike employment agreement, psychological contract comprises not only bothsides of the covenant in an employment relation but also involves the promisesand obligations being dependent on all types of perceived spoken messages,attitudes, and behaviours between the parties. As the individuals in various wayscan form this perception, the results during the process and the reflections to theworking life may display differences. The purpose of this study is to investigatethe impacts of the psychological contract on the relationship between employeeand employers. It is also within the scope of this study to evaluate the effects ofthe demographic characteristics such as gender, age, marital status, academicbackground, job tenure on psychological contract. In this study, firstly, the term“psychological contract” is examined, then employees’ ideas related topsychological contract are tried to be identified in health facilities and retailing sector in which flexible working is intensely implemented. The analyses of datacollected from the questionnaires have revealed the employees’ opinions abouttheissues within the context of psychological contract. When the results of this studyare assessed, it is concluded that demographic characteristics stated by theparticipants did not show any significant variation in the perception of bothorganizational and employees’ commitments.

  8. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.

    International Nuclear Information System (INIS)

    Schoene, Thomas

    2014-01-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  9. Compilation of LLNL CUP-2 Data

    Energy Technology Data Exchange (ETDEWEB)

    Eppich, G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kips, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lindvall, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-07-31

    The CUP-2 uranium ore concentrate (UOC) standard reference material, a powder, was produced at the Blind River uranium refinery of Eldorado Resources Ltd. in Canada in 1986. This material was produced as part of a joint effort by the Canadian Certified Reference Materials Project and the Canadian Uranium Producers Metallurgical Committee to develop a certified reference material for uranium concentration and the concentration of several impurity constituents. This standard was developed to satisfy the requirements of the UOC mining and milling industry, and was characterized with this purpose in mind. To produce CUP-2, approximately 25 kg of UOC derived from the Blind River uranium refinery was blended, homogenized, and assessed for homogeneity by X-ray fluorescence (XRF) analysis. The homogenized material was then packaged into bottles, containing 50 g of material each, and distributed for analysis to laboratories in 1986. The CUP-2 UOC standard was characterized by an interlaboratory analysis program involving eight member laboratories, six commercial laboratories, and three additional volunteer laboratories. Each laboratory provided five replicate results on up to 17 analytes, including total uranium concentration, and moisture content. The selection of analytical technique was left to each participating laboratory. Uranium was reported on an “as-received” basis; all other analytes (besides moisture content) were reported on a “dry-weight” basis. A bottle of 25g of CUP-2 UOC standard as described above was purchased by LLNL and characterized by the LLNL Nuclear Forensics Group. Non-destructive and destructive analytical techniques were applied to the UOC sample. Information obtained from short-term techniques such as photography, gamma spectrometry, and scanning electron microscopy were used to guide the performance of longer-term techniques such as ICP-MS. Some techniques, such as XRF and ICP-MS, provided complementary types of data. The results

  10. Conditions of contract for construction for building and engineering works designed by the employer : general conditions : guidance for the preparation of particular conditions forms of letter of tender, contract agreement and dispute adjudication agreement

    CERN Document Server

    1999-01-01

    Conditions of Contract for Construction, which are recommended for building or engineering works designed by the Employer or by his representative, the Engineer. Under the usual arrangements for this type of contract, the Contractor constructs the works in accordance with a design provided by the Employer. However, the works may include some elements of Contractor-designed civil, mechanical, electrical and/or construction works.

  11. Evaluation of the neutron dose received by personnel at the LLNL

    International Nuclear Information System (INIS)

    Hankins, D.E.

    1982-01-01

    This report was prepared to document the techniques being used to evaluate the neutron exposures received by personnel at the LLNL. Two types of evaluations are discussed covering the use of the routine personnel dosimeter and of the albedo neutron dosimeter. Included in the report are field survey results which were used to determine the calibration factors being applied to the dosimeter readings. Calibration procedures are discussed and recommendations are made on calibration and evaluation procedures

  12. The relationships between perceived organizational support, affective commitment, psychological contract breach, organizational citizenship behaviour and work engagement.

    Science.gov (United States)

    Gupta, Vishal; Agarwal, Upasna A; Khatri, Naresh

    2016-11-01

    This study examines the factors that mediate and moderate the relationships of perceived organizational support with work engagement and organization citizenship behaviour. Specifically, affective commitment is posited to mediate and psychological contract breach to moderate the above relationships. Nurses play a critical role in delivering exemplary health care. For nurses to perform at their best, they need to experience high engagement, which can be achieved by providing them necessary organizational support and proper working environment. Data were collected via a self-reported survey instrument. A questionnaire was administered to a random sample of 750 nurses in nine large hospitals in India during 2013-2014. Four hundred and seventy-five nurses (63%) responded to the survey. Hierarchical multiple regression was used for statistical analysis of the moderated-mediation model. Affective commitment was found to mediate the positive relationships between perceived organizational support and work outcomes (work engagement, organizational citizenship behaviour). The perception of unfulfilled expectations (psychological contract breach) was found to moderate the perceived organizational support-work outcome relationships adversely. The results of this study indicate that perceived organizational support exerts its influence on work-related outcomes and highlight the importance of taking organizational context, such as perceptions of psychological contract breach, into consideration when making sense of the influence of perceived organizational support on affective commitment, work engagement and citizenship behaviours of nurses. © 2016 John Wiley & Sons Ltd.

  13. Description and application of the AERIN Code at LLNL

    International Nuclear Information System (INIS)

    King, W.C.

    1986-01-01

    The AERIN code was written at the Lawrence Livermore National Laboratory in 1976 to compute the organ burdens and absorbed dose resulting from a chronic or acute inhalation of transuranic isotopes. The code was revised in 1982 to reflect the concepts of ICRP-30. This paper will describe the AERIN code and how it has been used at LLNL to study more than 80 cases of internal deposition and obtain estimates of internal dose. A comparison with the computed values of the committed organ dose is made with ICRP-30 values. The benefits of using the code are described. 3 refs., 3 figs., 6 tabs

  14. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  15. LLNL Underground-Coal-Gasification Project. Quarterly progress report, July-September 1981

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, D.R.; Clements, W. (eds.)

    1981-11-09

    We have continued our laboratory studies of forward gasification in small blocks of coal mounted in 55-gal drums. A steam/oxygen mixture is fed into a small hole drilled longitudinally through the center of the block, the coal is ignited near the inlet and burns toward the outlet, and the product gases come off at the outlet. Various diagnostic measurements are made during the course of the burn, and afterward the coal block is split open so that the cavity can be examined. Development work continues on our mathematical model for the small coal block experiments. Preparations for the large block experiments at a coal outcrop in the Tono Basin of Washington State have required steadily increasing effort with the approach of the scheduled starting time for the experiments (Fall 1981). Also in preparation is the deep gasification experiment, Tono 1, planned for another site in the Tono Basin after the large block experiments have been completed. Wrap-up work continues on our previous gasification experiments in Wyoming. Results of the postburn core-drilling program Hoe Creek 3 are presented here. Since 1976 the Soviets have been granted four US patents on various aspects of the underground coal gasification process. These patents are described here, and techniques of special interest are noted. Finally, we include ten abstracts of pertinent LLNL reports and papers completed during the quarter.

  16. 48 CFR 822.305 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 822.305... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety Standards Act 822.305 Contract clause. The contracting officer shall insert the clause at 852.222-70, Contract Work...

  17. Efficient preloading of the ventricles by a properly timed atrial contraction underlies stroke work improvement in the acute response to cardiac resynchronization therapy

    Science.gov (United States)

    Hu, Yuxuan; Gurev, Viatcheslav; Constantino, Jason; Trayanova, Natalia

    2013-01-01

    Background The acute response to cardiac resynchronization therapy (CRT) has been shown to be due to three mechanisms: resynchronization of ventricular contraction, efficient preloading of the ventricles by a properly timed atrial contraction, and mitral regurgitation reduction. However, the contribution of each of the three mechanisms to the acute response of CRT, specifically stroke work improvement, has not been quantified. Objective The goal of this study was to use an MRI-based anatomically accurate 3D model of failing canine ventricular electromechanics to quantify the contribution of each of the three mechanisms to stroke work improvement and identify the predominant mechanisms. Methods An MRI-based electromechanical model of the failing canine ventricles assembled previously by our group was further developed and modified. Three different protocols were used to dissect the contribution of each of the three mechanisms to stroke work improvement. Results Resynchronization of ventricular contraction did not lead to significant stroke work improvement. Efficient preloading of the ventricles by a properly timed atrial contraction was the predominant mechanism underlying stroke work improvement. Stroke work improvement peaked at an intermediate AV delay, as it allowed ventricular filling by atrial contraction to occur at a low diastolic LV pressure but also provided adequate time for ventricular filling before ventricular contraction. Diminution of mitral regurgitation by CRT led to stroke work worsening instead of improvement. Conclusion Efficient preloading of the ventricles by a properly timed atrial contraction is responsible for significant stroke work improvement in the acute CRT response. PMID:23928177

  18. LLNL Experimental Test Site (Site 300) Potable Water System Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, R. P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bellah, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-09-14

    The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

  19. Status of the SLAC/LBL/LLNL B-factory and the BABAR detector

    International Nuclear Information System (INIS)

    Oddone, P.

    1994-10-01

    After a brief introduction on the physics reach of the SLAC/LBL/LLNL Asymmetric B-Factory, the author describes the status of the accelerator and the detector as of the end of 1994. At this time, essentially all major decisions have been made, including the choice of particle identification for the detector. The author concludes this report with the description of the schedule for the construction of both accelerator and detector

  20. The new LLNL AMS sample changer

    International Nuclear Information System (INIS)

    Roberts, M.L.; Norman, P.J.; Garibaldi, J.L.; Hornady, R.S.

    1993-01-01

    The Center for Accelerator Mass Spectrometry at LLNL has installed a new 64 position AMS sample changer on our spectrometer. This new sample changer has the capability of being controlled manually by an operator or automatically by the AMS data acquisition computer. Automatic control of the sample changer by the data acquisition system is a necessary step towards unattended AMS operation in our laboratory. The sample changer uses a fiber optic shaft encoder for rough rotational indexing of the sample wheel and a series of sequenced pneumatic cylinders for final mechanical indexing of the wheel and insertion and retraction of samples. Transit time from sample to sample varies from 4 s to 19 s, depending on distance moved. Final sample location can be set to within 50 microns on the x and y axis and within 100 microns in the z axis. Changing sample wheels on the new sample changer is also easier and faster than was possible on our previous sample changer and does not require the use of any tools

  1. Psychological contract breach and work performance: Is social exchange a buffer or an intensifier?

    NARCIS (Netherlands)

    Bal, P.M.; Chiaburu, D.S.; Jansen, P.G.W.

    2010-01-01

    Purpose: The aim of this paper is to investigate how social exchanges modify the relationship between psychological contract breach and work performance. It aims to present two concurrent hypotheses, based on theoretical interaction effects of social exchanges (conceptualized as social exchange

  2. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  3. Trends in family labour, hired labour and contract work on french fieldcrop farms: the role of agricultural policies

    OpenAIRE

    Dupraz, Pierre; Latruffe, Laure

    2010-01-01

    This article analyses the factors driving the evolution of on-farm labour use, including own family labour, hired labour and contract work, in French fieldcrop farms during 1990-2007. Particular attention is given to the level and type of agricultural support. The increase in the farm labour force over the years is due to increases in hired labour and contract work which are complements for each other rather than substitutes, and complement for family labour. Crop area payments and Single Far...

  4. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  5. Brief considerations on the acquisition of works of art in the European regulation of public contracts

    Directory of Open Access Journals (Sweden)

    Pierpaolo Forte

    2017-11-01

    Full Text Available The work, renouncing to a precise definition of art, acknowledges that there are art objects and cultural objects, which, in this way, are relevant also in legal terms, and try to advance some reflections on the relevance of art in relation to the European discipline of public contracts and, in particular, what can be deduced from Directive 2014/24 / EU, which can well be understood as a sort of cultural sign that can provide insights into how art is perceived in Europe, even in political terms, in this historical phase. The paper therefore examines the use of negotiated procedures without prior publication of a contract notice, for the «creation or acquisition of a unique work of art or artistic performance», and to do so faces the problem of the object of the procurement by “contracting authorities” which deals with things or performances (works, supplies or services relating to artistic products, by examining the needs which a public administration may have in relation to obtaining the availability of a work of art, and the different modes of this type of acquisition. Finally, the study examines the theme of «art exhibitions», trying to prove that they are autonomous objects, which are represented in the European directive under the diction «artistic performance».

  6. Can labour contract differences in health and work-related attitudes be explained by quality of working life and job insecurity?

    NARCIS (Netherlands)

    Wagenaar, A.F.; Kompier, M.A.J.; Houtman, I.L.D.; Bossche, S. van den; Smulders, P.G.W.; Taris, T.W.

    2012-01-01

    Study aim: We hypothesise that due to a lower quality of working life and higher job insecurity, the health and workrelated attitudes of temporary workers may be less positive compared to permanent workers. Therefore, we aimed to (1) examine differences between contract groups (i.e. permanent

  7. OMICRON, LLNL ENDL Charged Particle Data Library Processing

    International Nuclear Information System (INIS)

    Mengoni, A.; Panini, G.C.

    2002-01-01

    1 - Description of program or function: The program has been designed to read the Evaluated Charged Particle Library (ECPL) of the LLNL Evaluated Nuclear Data Library (ENDL) and generate output in various forms: interpreted listing, ENDF format and graphs. 2 - Method of solution: A file containing ECPL in card image transmittal format is scanned to retrieve the requested reactions from the requested materials; in addition selections can be made by data type or incident particle. 3 - Restrictions on the complexity of the problem: The Reaction Property Designator I determines the type of data in the ENDL library (e.g. cross sections, angular distributions, Maxwellian averages, etc.); the program does not take into account the data for I=3,4 (energy-angle-distributions) since there are no data in the current ECPL version

  8. Features of the Maintenance Agreement (Contract for the Delivery of Goods, Works and Services for State and Municipal Needs

    Directory of Open Access Journals (Sweden)

    Evgeniya V. Loginova

    2015-12-01

    Full Text Available Article analyzes main features of the agreement (contract for the delivery of goods, works and services for state and municipal needs. It is shown that civil-legal nature of this agreement, which aims to meet the public interest. It is emphasized that this agreement is the special subject composition. Features of this type of contract, which is manifested in the use of special methods of placing state and municipal orders are shown. It is proved that for the public contract subject of the contract will depend on the considered whether the supply agreement or service contract. Existing in the modern civil law doctrine approaches to understanding the essential terms of the contract are analyzed. Features of pricing in this agreement is shown. It was concluded that, in contrast to other types of civil contracts, state contract has a wide range of essential conditions.

  9. Incentive contracts and time use

    OpenAIRE

    Tor Viking Eriksson; Jaime Ortega

    2011-01-01

    Empirical studies on incentive contracts have primarily been concerned with the effects on employees’ productivity and earnings. The productivity increases associated with such contracts may, however, come at the expense of quality of life at or outside work. In this paper we study the effect on the employees’ non-work activities, testing whether incentive contracts lead to a change in the allocation of time across work and non-work activities. In doing so, we distinguish between two effects,...

  10. 48 CFR 970.1707-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1707... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1707-4 Contract clause. Insert the clause at 970.5217-1, Work for Others Program (Non-DOE Funded Work), in any contract...

  11. Performance-based contracting in home-care work in The Netherlands: professionalism under pressure?

    Science.gov (United States)

    Oomkens, Rosanne; Hoogenboom, Marcel; Knijn, Trudie

    2016-07-01

    Our aim was to improve the understanding of the relationships between performance-based contracting, management supportiveness and professionalism in home care. Using path analysis, this article explores the relationships between home-care workers' perceptions of management support, implementation of performance-based contracting (i.e. use of strict time registration rules and cost-efficiency measures) and autonomy and intrinsic job satisfaction. We hypothesised that: use of strict time registration rules and cost-efficiency measures relates to lower levels of autonomy and intrinsic job satisfaction (H1); there is an indirect relationship between use of strict time registration rules and use of cost-efficiency measures and intrinsic job satisfaction via autonomy (H2); higher levels of management support relate to the use of looser time registration rules and less use of cost-efficiency measures (H3); and higher levels of management support relate to higher levels of autonomy and intrinsic job satisfaction (H4). We used data from a cross-sectional survey conducted in 2010 of a sample of Dutch home-care workers (N = 156, response rate = 34%). Overall, our study suggests that the consequences of performance-based contracting for professionalism are ambiguous. More specifically, using strict time registration rules is related to lower levels of autonomy, whereas using cost-efficiency measures does not seem to affect autonomy (H1). Performance-based contracting has no consequences for the level of fulfilment home-care workers find in their job, as neither of the two contracting dimensions measured was directly or indirectly related to intrinsic job satisfaction (H1, H2). The role of managers must be taken into account when studying performance-based contracting, because perceived higher management support is related to managers' less frequent use of both strict time registration rules and of cost-efficiency measures (H3). The insight we gained into the importance of

  12. The LLNL [Lawrence Livermore National Laboratory] ICF [Inertial Confinement Fusion] Program: Progress toward ignition in the Laboratory

    International Nuclear Information System (INIS)

    Storm, E.; Batha, S.H.; Bernat, T.P.; Bibeau, C.; Cable, M.D.; Caird, J.A.; Campbell, E.M.; Campbell, J.H.; Coleman, L.W.; Cook, R.C.; Correll, D.L.; Darrow, C.B.; Davis, J.I.; Drake, R.P.; Ehrlich, R.B.; Ellis, R.J.; Glendinning, S.G.; Haan, S.W.; Haendler, B.L.; Hatcher, C.W.; Hatchett, S.P.; Hermes, G.L.; Hunt, J.P.; Kania, D.R.; Kauffman, R.L.; Kilkenny, J.D.; Kornblum, H.N.; Kruer, W.L.; Kyrazis, D.T.; Lane, S.M.; Laumann, C.W.; Lerche, R.A.; Letts, S.A.; Lindl, J.D.; Lowdermilk, W.H.; Mauger, G.J.; Montgomery, D.S.; Munro, D.H.; Murray, J.R.; Phillion, D.W.; Powell, H.T.; Remington, B.R.; Ress, D.B.; Speck, D.R.; Suter, L.J.; Tietbohl, G.L.; Thiessen, A.R.; Trebes, J.E.; Trenholme, J.B.; Turner, R.E.; Upadhye, R.S.; Wallace, R.J.; Wiedwald, J.D.; Woodworth, J.G.; Young, P.M.; Ze, F.

    1990-01-01

    The Inertial Confinement Fusion (ICF) Program at the Lawrence Livermore National Laboratory (LLNL) has made substantial progress in target physics, target diagnostics, and laser science and technology. In each area, progress required the development of experimental techniques and computational modeling. The objectives of the target physics experiments in the Nova laser facility are to address and understand critical physics issues that determine the conditions required to achieve ignition and gain in an ICF capsule. The LLNL experimental program primarily addresses indirect-drive implosions, in which the capsule is driven by x rays produced by the interaction of the laser light with a high-Z plasma. Experiments address both the physics of generating the radiation environment in a laser-driven hohlraum and the physics associated with imploding ICF capsules to ignition and high-gain conditions in the absence of alpha deposition. Recent experiments and modeling have established much of the physics necessary to validate the basic concept of ignition and ICF target gain in the laboratory. The rapid progress made in the past several years, and in particular, recent results showing higher radiation drive temperatures and implosion velocities than previously obtained and assumed for high-gain target designs, has led LLNL to propose an upgrade of the Nova laser to 1.5 to 2 MJ (at 0.35 μm) to demonstrate ignition and energy gains of 10 to 20 -- the Nova Upgrade

  13. Lawrence Livermore National Laboratory Working Reference Material Production Pla

    Energy Technology Data Exchange (ETDEWEB)

    Wong, Amy; Thronas, Denise; Marshall, Robert

    1998-11-04

    This Lawrence Livermore National Laboratory (LLNL) Working Reference Material Production Plan was written for LLNL by the Los Alamos National Laboratory to address key elements of producing seven Pu-diatomaceous earth NDA Working Reference Materials (WRMS). These WRMS contain low burnup Pu ranging in mass from 0.1 grams to 68 grams. The composite Pu mass of the seven WRMS was designed to approximate the maximum TRU allowable loading of 200 grams Pu. This document serves two purposes: first, it defines all the operations required to meet the LLNL Statement of Work quality objectives, and second, it provides a record of the production and certification of the WRMS. Guidance provided in ASTM Standard Guide C1128-89 was used to ensure that this Plan addressed all the required elements for producing and certifying Working Reference Materials. The Production Plan was written to provide a general description of the processes, steps, files, quality control, and certification measures that were taken to produce the WRMS. The Plan identifies the files where detailed procedures, data, quality control, and certification documentation and forms are retained. The Production Plan is organized into three parts: a) an initial section describing the preparation and characterization of the Pu02 and diatomaceous earth materials, b) middle sections describing the loading, encapsulation, and measurement on the encapsulated WRMS, and c) final sections describing the calculations of the Pu, Am, and alpha activity for the WRMS and the uncertainties associated with these quantities.

  14. Assessment of work-related muscle strain by using surface EMG during test contractions interposed between work periods of simulateted mushroom picking

    DEFF Research Database (Denmark)

    Ohashi, Jun-Ya; Blangsted, Anne Katrine; Nielsen, Pernille Kofoed

    2010-01-01

    Surface electromyograms(EMG) during test contractions (TCs) were studied to assess the muscle strain in simulated mushroom picking. Additionally, the duration of the TC for the effective assessment was investigated. Nine female subjects performed standardized shoulder abduction and a stooped...... posture for one minute as TCs. Each experiment consisted of a 60-min rest, three work periods (W1-W3), a 30-min rest, and two work periods (W4 and W5) separated by a 30-min rest period. The duration of each work period was about 20 min. A total of 18 TCs was performed between the work periods and every 10...

  15. Memories of early work on muscle contraction and regulation in the 1950's and 1960's

    International Nuclear Information System (INIS)

    Huxley, Hugh E.

    2008-01-01

    Professor Ebashi's epic work on the biochemistry of the regulation of muscle contraction began in the early 1950's, during the same period that work on the molecular basis of force production in muscle was also beginning. The latter work started in two MRC Research Units in the UK, and was continued jointly by the two workers from those Units who had, independently, gone to MIT to learn the new techniques of electron microscopy and to apply them to muscle. In a somewhat similar fashion, Professor Ebashi also spent one or two years in the USA, continuing his work on the role of calcium in muscle regulation in Lippman's laboratory, before returning to Japan to achieve the great breakthroughs in this work during the 1960's. Hanson and Huxley, after putting forward the overlapping actin and myosin filament arrays model for the striated muscle sarcomere, and subsequently the sliding filament model of muscle contraction (simultaneously with A.F Huxley and R. Niedergerke), returned to the UK to pursue detailed structural studies in separate Research Units, in a mixture of consultation, collaboration, and competition, during the later 1950's and throughout the 1960's. However, the path to enlightenment described here in some detail was somewhat more tortuous than the standard literature perhaps reveals. Nevertheless, by the time of the Cold Spring Harbor Symposium on Muscle Contraction in 1972, the two lines of enquiry on regulation itself, and on the tilting cross-bridge model of force production, had arrived at a good deal of common ground, and indeed the identification of troponin and its periodic distribution along the actin filaments had helped resolve a long-standing puzzle in the interpretation of the low angle X-ray diagram. Since then, an enormous amount of remarkable new work has been necessary to establish troponin regulation and the tilting cross-bridge mechanism in molecular detail, but the work in the 1950's and 1960's has provided a firm and accurate basis

  16. Comparison between calculation and measurement of energy deposited by 800 MeV protons

    International Nuclear Information System (INIS)

    Loewe, W.E.

    1980-01-01

    The High Energy Transport Code, HETC, was obtained from the Radiation Shielding Information Center (RSIC) at Oak Ridge National Laboratory and altered as necessary to run on a CDC 7600 using the LTSS software in use at LLNL. HETC was then used to obtain calculated estimates of energy deposited, for comparison with a series of benchmark experiments done by LLNL. These experiments used proton beams of various energies incident on well-defined composite targets in good geometry. In this report, two aspects of the comparison between calculated and experimental energy depositions from an 800 MeV proton beam are discussed. Both aspects involve the fact that workers at SAI had previously used their version of HETC to calculate this experiment and reported their comparison with the measured data. The first aspect addressed is that their calculated data and LLNL calculations do not agree, suggesting an error in the conversion process from the RSIC code. The second aspect is not independent of the first, but is of sufficient importance to merit separate emphasis. It is that the SAI calculations agree well with experiments at the detector plate located some distance from the shower plate, whereas the LLNL calculations show a clearcut discrepancy there in comparison with the experiment. A contract was let in January 1980 by LLNL with SAI in order to obtain full details on the two cited aspects of the comparison between calculated and experimental energy depositions from an 800 MeV proton beam. The ensuing discussion is based on the final report of that contracted work

  17. HARMONIZATION OF THE CONSUMER CONTRACT DISPOSITIONS WITH THE GENERAL CONTRACT RULES

    Directory of Open Access Journals (Sweden)

    Alexandru MATEESCU

    2016-05-01

    Full Text Available This work contains and mainly tackles the contract of consumption, its differences and similitudes to a general contract, manners of applying it, and the way in which the former can be better coordinated and correlated to the general contracting terms, established by the civil law. Along the years, the consumption contract has undergone several addenda and it has come to represent an instrument of both refference and regulation for the socio-economical relations between two parties who have a commercial agreement. The general law frame has had a great influence in the development of the consumption contract, as well as on its applicability conditions and its manner of deployment. Through the development of the judicial law concerning the contract of concumption, this type of agreement has influenced, through its human and social nature, both the general contract, and the specific frame it relates to. The relationship between the two types of contract is one of interdependence, which is determined by the need of judicial regulation in the Romanian and European economy. The ceaselees development of interhuman relations pushes society towards maintaining a continuous study of the advancement of specific legislation and judicial regulation. The main purpose of this work is analyzing the general judicial frame and the way in which the differences between the general contract and the consumption one may represent a benefic and mutual influence on protecting the citizens’ rights, which in the case of the consumption contract encompasses the protection of consumers’ rights. Also, it will analyze the aspects that determine the manner of application and the the differences that can be surmounted in order to achieve a better cohesion between these types of contracts.

  18. Short-Term Contract Work in Adult Education (I) and (II).

    Science.gov (United States)

    Hall, Dorothea; McMath, Patricia

    1986-01-01

    This two-part article discusses short-term project contracts for adult education staff. Part one covers implications of this trend for the service and for the staff involved. Part two looks at short-term contracts from the management viewpoint. (CH)

  19. Contracting and building renovation - does it work together?

    Energy Technology Data Exchange (ETDEWEB)

    Tritthart, Wibke; Bruner-Lienhart, Susanne [Inter-Univ. Research Centre for Technology, Work and Culture, Graz (Austria); Bleyl, Jan W.; Bucar, Gerhard [Graz Energy Agency (Austria)

    2007-07-01

    The renovation or refurbishment is an important point in the life cycle of a building that makes it possible to achieve both environmental and climate protection goals and a higher quality of living of the inhabitants. However, lack of money often leads to a renovation that covers only the basic requirements, whereas measures that are valuable in a long term perspective like energy saving measures are not realised. Energy performance contracting (EPC) is widely used as an instrument to reduce long term operating costs significantly by guaranteed energy savings. An energy service company (ESCo) implements saving technologies, especially in the field of heating, HVAC, lighting and plug loads, and in particular in public buildings. It is the aim of this paper to investigate the possibilities to incorporate construction measures like building envelope insulation into standard energy performance contracting.For this purpose a qualitative survey is presented that was performed among experts and stakeholders in the business: ESCos, building owners and facility managers, representatives of construction companies and financing institutions were interviewed. The focus was on their experiences with such projects, on difficulties that arose or barriers that exist from their point of view and on the chances they perceived. This provides the basis for identifying restraints and supporting factors for the integration of contracting and constructional measures.Three pilot projects that have been renovated in Austria are outlined subsequently. They are evaluated with respect to the contractual network between the project partners, types of guarantees and financing issues. Special emphasis is put on the assignment of tasks and the cash flow between the project partners. Various constellations of trades acted as energy service provider: a general contractor, an energy supply company, a consortium of a builder and a plumber. The projects reveal some differences to the standard energy

  20. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  1. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  2. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  3. Linear collider research and development at SLAC, LBL and LLNL

    International Nuclear Information System (INIS)

    Mattison, T.S.

    1988-10-01

    The study of electron-positron (e + e/sup /minus//) annihilation in storage ring colliders has been very fruitful. It is by now well understood that the optimized cost and size of e + e/sup /minus// storage rings scales as E(sub cm//sup 2/ due to the need to replace energy lost to synchrotron radiation in the ring bending magnets. Linear colliders, using the beams from linear accelerators, evade this scaling law. The study of e/sup +/e/sup /minus// collisions at TeV energy will require linear colliders. The luminosity requirements for a TeV linear collider are set by the physics. Advanced accelerator research and development at SLAC is focused toward a TeV Linear Collider (TLC) of 0.5--1 TeV in the center of mass, with a luminosity of 10/sup 33/--10/sup 34/. The goal is a design for two linacs of less than 3 km each, and requiring less than 100 MW of power each. With a 1 km final focus, the TLC could be fit on Stanford University land (although not entirely within the present SLAC site). The emphasis is on technologies feasible for a proposal to be framed in 1992. Linear collider development work is progressing on three fronts: delivering electrical energy to a beam, delivering a focused high quality beam, and system optimization. Sources of high peak microwave radio frequency (RF) power to drive the high gradient linacs are being developed in collaboration with Lawrence Berkeley Laboratory (LBL) and Lawrence Livermore National Laboratory (LLNL). Beam generation, beam dynamics and final focus work has been done at SLAC and in collaboration with KEK. Both the accelerator physics and the utilization of TeV linear colliders were topics at the 1988 Snowmass Summer Study. 14 refs., 4 figs., 1 tab

  4. Effects of stratospheric aerosol surface processes on the LLNL two-dimensional zonally averaged model

    International Nuclear Information System (INIS)

    Connell, P.S.; Kinnison, D.E.; Wuebbles, D.J.; Burley, J.D.; Johnston, H.S.

    1992-01-01

    We have investigated the effects of incorporating representations of heterogeneous chemical processes associated with stratospheric sulfuric acid aerosol into the LLNL two-dimensional, zonally averaged, model of the troposphere and stratosphere. Using distributions of aerosol surface area and volume density derived from SAGE 11 satellite observations, we were primarily interested in changes in partitioning within the Cl- and N- families in the lower stratosphere, compared to a model including only gas phase photochemical reactions

  5. LLNL Containment Program nuclear test effects and geologic data base: glossary and parameter definitions

    International Nuclear Information System (INIS)

    Howard, N.W.

    1983-01-01

    This report lists, defines, and updates Parameters in DBASE, an LLNL test effects data bank in which data are stored from experiments performed at NTS and other test sites. Parameters are listed by subject and by number. Part 2 of this report presents the same information for parameters for which some of the data may be classified; it was issued in 1979 and is not being reissued at this time as it is essentially unchanged

  6. Left Unsaid: The Role of Work Expectations and Psychological Contracts in Faculty Careers and Departure

    Science.gov (United States)

    O'Meara, KerryAnn; Bennett, Jessica Chalk; Neihaus, Elizabeth

    2016-01-01

    Early career faculty bring many expectations to the door-steps of their new academic homes. Yet such expectations are often left unsaid. Unfortunately, what is left unsaid can be a major factor in faculty departure. This study makes a distinct contribution to the departure literature by examining the psychological contracts and work expectations…

  7. Progress in AMS measurements at the LLNL spectrometer

    International Nuclear Information System (INIS)

    Southon, J.R.; Vogel, J.S.; Trumbore, S.E.; Davis, J.C.; Roberts, M.L.; Caffee, M.; Finkel, R.; Proctor, I.D.; Heikkinen, D.W.; Berno, A.J.; Hornady, R.S.

    1991-06-01

    The AMS measurement program at LLNL began in earnest in late 1989, and has initially concentrated on 14 C measurements for biomedical and geoscience applications. We have now begun measurements on 10 Be and 36 Cl, are presently testing the spectrometer performance for 26 Al and 3 H, and will begin tests on 7 Be, 41 Ca and 129 I within the next few months. Our laboratory has a strong biomedical AMS program of 14 C tracer measurements involving large numbers of samples (sometimes hundreds in a single experiment) at 14 C concentrations which are typically .5--5 times Modern, but are occasionally highly enriched. The sample preparation techniques required for high throughput and low cross-contamination for this work are discussed elsewhere. Similar demands are placed on the AMS measurement system, and in particular on the ion source. Modifications to our GIC 846 ion source, described below, allow us to run biomedical and geoscience or archaeological samples in the same source wheel with no adverse effects. The source has a capacity for 60 samples (about 45 unknown) in a single wheel and provides currents of 30--60μA of C - from hydrogen-reduced graphite. These currents and sample capacity provide high throughput for both biomedical and other measurements: the AMS system can be started up, tuned, and a wheel of carbon samples measured to 1--1.5% in under a day; and 2 biomedical wheels can be measured per day without difficulty. We report on the present status of the Lawrence Livermore AMS spectrometer, including sample throughput and progress towards routine 1% measurement capability for 14 C, first results on other isotopes, and experience with a multi-sample high intensity ion source. 5 refs

  8. 10 CFR 850 Implementation of Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S

    2012-01-05

    10 CFR 850 defines a contractor as any entity, including affiliated entities, such as a parent corporation, under contract with DOE, including a subcontractor at any tier, with responsibility for performing work at a DOE site in furtherance of a DOE mission. The Chronic Beryllium Disease Prevention Program (CBDPP) applies to beryllium-related activities that are performed at the Lawrence Livermore National Laboratory (LLNL). The CBDPP or Beryllium Safety Program is integrated into the LLNL Worker Safety and Health Program and, thus, implementation documents and responsibilities are integrated in various documents and organizational structures. Program development and management of the CBDPP is delegated to the Environment, Safety and Health (ES&H) Directorate, Worker Safety and Health Functional Area. As per 10 CFR 850, Lawrence Livermore National Security, LLC (LLNS) periodically submits a CBDPP to the National Nuclear Security Administration/Livermore Site Office (NNSA/LSO). The requirements of this plan are communicated to LLNS workers through ES&H Manual Document 14.4, 'Working Safely with Beryllium.' 10 CFR 850 is implemented by the LLNL CBDPP, which integrates the safety and health standards required by the regulation, components of the LLNL Integrated Safety Management System (ISMS), and incorporates other components of the LLNL ES&H Program. As described in the regulation, and to fully comply with the regulation, specific portions of existing programs and additional requirements are identified in the CBDPP. The CBDPP is implemented by documents that interface with the workers, principally through ES&H Manual Document 14.4. This document contains information on how the management practices prescribed by the LLNL ISMS are implemented, how beryllium hazards that are associated with LLNL work activities are controlled, and who is responsible for implementing the controls. Adherence to the requirements and processes described in the ES&H Manual ensures

  9. Superconducting magnet development capability of the LLNL [Lawrence Livermore National Laboratory] High Field Test Facility

    International Nuclear Information System (INIS)

    Miller, J.R.; Shen, S.; Summers, L.T.

    1990-02-01

    This paper discusses the following topics: High-Field Test Facility Equipment at LLNL; FENIX Magnet Facility; High-Field Test Facility (HFTF) 2-m Solenoid; Cryogenic Mechanical Test Facility; Electro-Mechanical Conductor Test Apparatus; Electro-Mechanical Wire Test Apparatus; FENIX/HFTF Data System and Network Topology; Helium Gas Management System (HGMS); Airco Helium Liquefier/Refrigerator; CTI 2800 Helium Liquefier; and MFTF-B/ITER Magnet Test Facility

  10. Contracting in specialists for emergency obstetric care- does it work in rural India?

    Directory of Open Access Journals (Sweden)

    Randive Bharat

    2012-12-01

    Full Text Available Abstract Background Contracting in private sector is promoted in developing countries facing human resources shortages as a challenge to reduce maternal mortality. This study explored provision, practice, performance, barriers to execution and views about contracting in specialists for emergency obstetric care (EmOC in rural India. Methods Facility survey was conducted in all secondary and tertiary public health facilities (44 in three heterogeneous districts in Maharashtra state of India. Interviews (42 were conducted with programme managers and district and block level officials and with public and private EmOC specialists. Locations of private obstetricians in the study districts were identified and mapped. Results Two schemes, namely Janani Suraksha Yojana and Indian Public Health standards (IPHS provided for contracting in EmOC specialists. The IPHS provision was chosen for use mainly due to greater sum for contracting in (US $ 30/service episode vs.300 US$/month. The positions of EmOC specialists were vacant in 83% of all facilities that hence had a potential for contracting in EmOC specialists. Private specialists were contracted in at 20% such facilities. The contracting in of specialists did not greatly increase EmOC service outputs at facilities, except in facilities with determined leadership. Contracting in specialists was useful for non emergency conditions, but not for obstetric emergencies. The contracts were more of a relational nature with poor monitoring structures. Inadequate infrastructure, longer distance to private specialists, insufficient financial provision for contracting in, and poor management capacities were barriers to effective implementation of contracting in. Dependency on the private sector was a concern among public partners while the private partners viewed contracting in as an opportunity to gain experience and credibility. Conclusions Density and geographic distribution of private specialists are important

  11. Contracting in specialists for emergency obstetric care- does it work in rural India?

    Science.gov (United States)

    Randive, Bharat; Chaturvedi, Sarika; Mistry, Nerges

    2012-12-31

    Contracting in private sector is promoted in developing countries facing human resources shortages as a challenge to reduce maternal mortality. This study explored provision, practice, performance, barriers to execution and views about contracting in specialists for emergency obstetric care (EmOC) in rural India. Facility survey was conducted in all secondary and tertiary public health facilities (44) in three heterogeneous districts in Maharashtra state of India. Interviews (42) were conducted with programme managers and district and block level officials and with public and private EmOC specialists. Locations of private obstetricians in the study districts were identified and mapped. Two schemes, namely Janani Suraksha Yojana and Indian Public Health standards (IPHS) provided for contracting in EmOC specialists. The IPHS provision was chosen for use mainly due to greater sum for contracting in (US $ 30/service episode vs.300 US$/month). The positions of EmOC specialists were vacant in 83% of all facilities that hence had a potential for contracting in EmOC specialists. Private specialists were contracted in at 20% such facilities. The contracting in of specialists did not greatly increase EmOC service outputs at facilities, except in facilities with determined leadership. Contracting in specialists was useful for non emergency conditions, but not for obstetric emergencies. The contracts were more of a relational nature with poor monitoring structures. Inadequate infrastructure, longer distance to private specialists, insufficient financial provision for contracting in, and poor management capacities were barriers to effective implementation of contracting in. Dependency on the private sector was a concern among public partners while the private partners viewed contracting in as an opportunity to gain experience and credibility. Density and geographic distribution of private specialists are important influencing factors in determining feasibility and use of

  12. 48 CFR 903.971 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 903.971... Contract clause. The contracting officer shall insert the clause at 952.203-70, Whistleblower Protection for Contractor Employees, in contracts that involve work to be done on behalf of DOE directly related...

  13. Research at Clark in the early '60s and at LLNL in the late '80s

    International Nuclear Information System (INIS)

    Gatrousis, C.

    1993-01-01

    Tom Sugihara's scientific leadership over a period of almost four decades covered many areas. His early research at Clark dealt with fission yields measurements and radiochemical separations of fallout species in the marine environment. Tom pioneered many of the methods for detecting soft beta emitters and low levels of radioactivity. Studies of the behavior of radioactivity in the marine ecosystem were important adjuncts to Tom's nuclear science research at Clark University which emphasized investigations of nuclear reaction mechanisms. Among Tom's most important contributions while at Clark was his work with Matsuo and Dudey on the interpretation of isomeric yield ratios and fission studies with Noshkin and Baba. Tom's scientific career oscillated between research and administration. During the latter part of his career his great breadth of interests and his scientific open-quotes tasteclose quotes had a profound influence at LLNL in areas that were new to him, materials science and solid state physics

  14. Overview of the LBL/LLNL negative-ion-based neutral beam program

    International Nuclear Information System (INIS)

    Pyle, R.V.

    1980-01-01

    The LBL/LLNL negative-ion-based neutral beam development program and status are described. The emphasis has shifted in some details since the first symposium in 1977, but our overall objectives remain the same, namely, the development of megawatt d.c. injection systems. Previous emphasis was on a system in which the negative ions were produced by double charge exchange in sodium vapor. At present, the emphasis is on a self-extraction source in which the negative ions are produced on a biased surface imbedded in a plasma. A one-ampere beam will be accelerated to at least 40 keV next year. Studies of negative-ion formation and interactions help provide a data base for the technology program

  15. Making contract farming work? : society and technology in Philippine transnational agribusiness

    NARCIS (Netherlands)

    Vellema, S.

    2002-01-01

    Keywords: contract farming, agribusiness, Philippines, Southeast Asia, asparagus, hybrid maize

    Contract farming is a widespread and important tool for organising agricultural production in line with corporate strategies and market demands. This book analyses how Philippine farmers

  16. A probabilistic risk assessment of the LLNL Plutonium facility's evaluation basis fire operational accident

    International Nuclear Information System (INIS)

    Brumburgh, G.

    1994-01-01

    The Lawrence Livermore National Laboratory (LLNL) Plutonium Facility conducts numerous involving plutonium to include device fabrication, development of fabrication techniques, metallurgy research, and laser isotope separation. A Safety Analysis Report (SAR) for the building 332 Plutonium Facility was completed rational safety and acceptable risk to employees, the public, government property, and the environment. This paper outlines the PRA analysis of the Evaluation Basis Fire (EDF) operational accident. The EBF postulates the worst-case programmatic impact event for the Plutonium Facility

  17. 48 CFR 32.104 - Providing contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.104 Section 32.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.104 Providing contract financing. (a) Prudent contract financing can be a useful working tool in Government...

  18. Psychological contract breach and work performance:Is social exchange a buffer or an intensifier?

    OpenAIRE

    Bal, P. Matthijs; Chiaburu, Dan S.; Jansen, Paul G. W.

    2010-01-01

    Purpose: The aim of this paper is to investigate how social exchanges modify the relationship between psychological contract breach and work performance. It aims to present two concurrent hypotheses, based on theoretical interaction effects of social exchanges (conceptualized as social exchange relationships, POS, and trust). Design/methodology/approach: Data were collected from a sample of 266 employees in a service sector company in the USA. Regression analysis was used to explore the moder...

  19. Linkage between Psychological Contract and Employee Retention

    African Journals Online (AJOL)

    GRACE

    strengthened by clearly stating expectations during recruitment and ... Impact of psychological contract in a work environment vis-à-vis employee retention, ..... psychological contract that will incite a faithful, fruitful and fulfilled work team.

  20. Fe L-shell Excitation Cross Section Measurements on EBIT-I

    Science.gov (United States)

    Chen, Hui; Beiersdorfer, P.; Brown, G.; Boyce, K.; Kelley, R.; Kilbourne, C.; Porter, F.; Gu, M. F.; Kahn, S.

    2006-09-01

    We report the measurement of electron impact excitation cross sections for the strong iron L-shell 3-2 lines of Fe XVII to Fe XXIV at the LLNL EBIT-I electron beam ion trap using a crystal spectrometer and NASA-Goddard Space Flight Center's 6x6 pixel array microcalorimeter. The cross sections were determined by direct normalization to the well-established cross sections for radiative electron capture. Our results include the excitation cross section for over 50 lines at multiple electron energies. Although we have found that for 3C line in Fe XVII the measured cross sections differ significantly from theory, in most cases the measurements and theory agree within 20%. This work was performed under the auspices of the U.S. DOE by LLNL under contract No. W-7405-Eng-48 and supported by NASA APRA grants to LLNL, GSFC, and Stanford University.

  1. Criticality Safety Support to a Project Addressing SNM Legacy Items at LLNL

    International Nuclear Information System (INIS)

    Pearson, J S; Burch, J G; Dodson, K E; Huang, S T

    2005-01-01

    The programmatic, facility and criticality safety support staffs at the LLNL Plutonium Facility worked together to successfully develop and implement a project to process legacy (DNFSB Recommendation 94-1 and non-Environmental, Safety, and Health (ES and H) labeled) materials in storage. Over many years, material had accumulated in storage that lacked information to adequately characterize the material for current criticality safety controls used in the facility. Generally, the fissionable material mass information was well known, but other information such as form, impurities, internal packaging, and presence of internal moderating or reflecting materials were not well documented. In many cases, the material was excess to programmatic need, but such a determination was difficult with the little information given on MC and A labels and in the MC and A database. The material was not packaged as efficiently as possible, so it also occupied much more valuable storage space than was necessary. Although safe as stored, the inadequately characterized material posed a risk for criticality safety noncompliances if moved within the facility under current criticality safety controls. A Legacy Item Implementation Plan was developed and implemented to deal with this problem. Reasonable bounding conditions were determined for the material involved, and criticality safety evaluations were completed. Two appropriately designated glove boxes were identified and criticality safety controls were developed to safely inspect the material. Inspecting the material involved identifying containers of legacy material, followed by opening, evaluating, processing if necessary, characterizing and repackaging the material. Material from multiple containers was consolidated more efficiently thus decreasing the total number of stored items to about one half of the highest count. Current packaging requirements were implemented. Detailed characterization of the material was captured in databases

  2. Contract farming with possible reneging in a developing country: Can it work?

    Directory of Open Access Journals (Sweden)

    Woonghee Tim Huh

    2012-12-01

    Full Text Available We consider a processed-food manufacturer that faces uncertain exogenous demand and procures a farm crop either from the outside market or from local farmers via contract farming. The contract price is determined at the beginning of the season when the market price is still uncertain. When the market price is realised, we allow the farmer the possibility of reneging from the contract, which occurs if the market price is sufficiently high. We show that granting farmers the option of reneging on the contract may improve the manufacturer's expected profit, and identify the conditions under which such an improvement can be expected.

  3. Psychological Contracts: Are They Still Relevant?

    Science.gov (United States)

    Maguire, Heather

    2002-01-01

    Empirical evidence from a banking organization illustrated how change has an impact on psychological contracts. Concluded that maintenance of contracts makes an important contribution to relationships but organizations need to adjust psychological contracts to meet the needs of the work force. (Contains 58 references.) (JOW)

  4. Proposal for the award of an industrial services contract for civil engineering superstructure and internal construction building work

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for civil engineering superstructure and internal construction building work. Following a market survey carried out among 112 firms in fifteen Member States, a call for tenders (IT-2546/ST/Rev.) was sent on 12 April 2001 to eleven consortia, four consisting of four firms, three consisting of three firms and four consisting of two firms, in seven Member States. By the closing date, CERN had received tenders from eight consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE CITRA SUD-EST(FR)-ANTIRUST TECHNOLOGY (GR), the lowest bidder, for an initial period of three years from 1 January 2002 for an amount not exceeding 15 375 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this ...

  5. Muscle contraction duration and fibre recruitment influence blood flow and oxygen consumption independent of contractile work during steady-state exercise in humans.

    Science.gov (United States)

    Richards, Jennifer C; Crecelius, Anne R; Kirby, Brett S; Larson, Dennis G; Dinenno, Frank A

    2012-06-01

    We tested the hypothesis that, among conditions of matched contractile work, shorter contraction durations and greater muscle fibre recruitment result in augmented skeletal muscle blood flow and oxygen consumption ( ) during steady-state exercise in humans. To do so, we measured forearm blood flow (FBF; Doppler ultrasound) during 4 min of rhythmic hand-grip exercise in 24 healthy young adults and calculated forearm oxygen consumption ( ) via blood samples obtained from a catheter placed in retrograde fashion into a deep vein draining the forearm muscle. In protocol 1 (n = 11), subjects performed rhythmic isometric hand-grip exercise at mild and moderate intensities during conditions in which time-tension index (isometric analogue of work) was held constant but contraction duration was manipulated. In this protocol, shorter contraction durations led to greater FBF (184 ± 25 versus 164 ± 25 ml min(-1)) and (23 ± 3 versus 17 ± 2 ml min(-1); both P flow. Our collective data indicate that, among matched workloads, shorter contraction duration and greater muscle fibre recruitment augment FBF and during mild-intensity forearm exercise, and that muscle blood flow is more closely related to metabolic cost ( ) rather than contractile work per se during steady-state exercise in humans.

  6. 48 CFR 970.1170-2 - Contract provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract provision. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1170-2 Contract provision. The Contracting Officer shall insert the clause at 970.5211-1, Work authorization, in each...

  7. 48 CFR 970.2303-3 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... facility, the clause at 48 CFR 970.5223-1, Integration of Environment, Safety and Health into Work Planning..., Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2303-3 Contract clauses. (a) When work under management and operating contracts and subcontracts thereunder is to be performed at a...

  8. Comparative analysis of JKR Sarawak form of contract and Malaysia Standard form of building contract (PWD203A)

    Science.gov (United States)

    Yunus, A. I. A.; Muhammad, W. M. N. W.; Saaid, M. N. F.

    2018-04-01

    Standard form of contract is normally being used in Malaysia construction industry in establishing legal relation between contracting parties. Generally, most of Malaysia federal government construction project used PWD203A which is a standard form of contract to be used where Bills of Quantities Form Part of the Contract and it is issued by Public Works Department (PWD/JKR). On the other hand in Sarawak, the largest state in Malaysia, the state government has issued their own standard form of contract namely JKR Sarawak Form of Contract 2006. Even both forms have been used widely in construction industry; there is still lack of understanding on both forms. The aim of this paper is to identify significant provision on both forms of contract. Document analysis has been adopted in conducting an in-depth review on both forms. It is found that, both forms of contracts have differences and similarities on several provisions specifically matters to definitions and general; execution of the works; payments, completion and final account; and delay, dispute resolution and determination.

  9. Contract Teachers: Experimental Evidence from India. NBER Working Paper No. 19440

    Science.gov (United States)

    Muralidharan, Karthik; Sundararaman, Venkatesh

    2013-01-01

    The large-scale expansion of primary schooling in developing countries has led to the increasing use of non-civil-service contract teachers who are hired locally by the school, are not professionally trained, have fixed-term renewable contracts, and are paid much lower salaries than regular civil-service teachers. This has been a controversial…

  10. Net Weight Issue LLNL DOE-STD-3013 Containers

    International Nuclear Information System (INIS)

    Wilk, P

    2008-01-01

    The following position paper will describe DOE-STD-3013 container sets No.L000072 and No.L000076, and how they are compliant with DOE-STD-3013-2004. All masses of accountable nuclear materials are measured on LLNL certified balances maintained under an MC and A Program approved by DOE/NNSA LSO. All accountability balances are recalibrated annually and checked to be within calibration on each day that the balance is used for accountability purposes. A statistical analysis of the historical calibration checks from the last seven years indicates that the full-range Limit of Error (LoE, 95% confidence level) for the balance used to measure the mass of the contents of the above indicated 3013 containers is 0.185 g. If this error envelope, at the 95% confidence level, were to be used to generate an upper-limit to the measured weight of the containers No.L000072 and No.L000076, the error-envelope would extend beyond the 5.0 kg 3013-standard limit on the package contents by less than 0.3 g. However, this is still well within the intended safety bounds of DOE-STD-3013-2004

  11. Department of Energy contract/business management initiatives

    International Nuclear Information System (INIS)

    Fisher, S.B.

    1992-01-01

    More than 40 years ago the Department of Energy (DOE) developed a unique contractual instrument called a management and operating contract, to be used for the operation of our weapons production plants and the national laboratories. The contracts are very broad in scope. There is no output objective set forth in the contract. There are no cost targets, nor any contractually motivated cost objectives. Performance is measured against criteria which is often subjective. The time has come to make changes in the structure of these contracts to reflect changes in the work being performed and to make the contractors more accountable. DOE's work now, at these sites, and for years to come, consists largely of major project-type work such as environmental restoration which lends itself to a more definitized structure. DOE is in the process of implementing a work order authorization control system (task order contracting) under its management and operating contracts. Target date for implementation for our for-profit contractors is FY 1992, and for the non-profit contractors is FY 1993. Under this system, requirements will be contracted for as entities of work and contractors will be held accountable for performance, schedules and costs. Billings, payments and award fee will be tied to the specific planning objectives set forth in the tasks, including costs and schedules. Incentives will be provided for outstanding performance, fee may be withheld if performance is unacceptable. These changes will necessitate more DOE oversight of contractor operations and sound business support systems, as well as effective management disciplines. US DOE will perform business management reviews to assure contractors' systems are adequate and to support this form of contracting. The Contractor Procurement Systems Review Program will be enhanced to assure good subcontractor procurement practices

  12. Trends in family labour, hired labour and contract work on French and Swiss crop farms: The role of agricultural policies

    OpenAIRE

    Dupraz, Pierre; Latruffe, Laure; Mann, Stefan

    2010-01-01

    The objective of this article is to analyse the trends in on-farm labour use, including own family labour, hired labour and contract work, and to assess the factors driving their evolution in France and in Switzerland during 1990-2007. A particular attention is given to agricultural policies, namely the level and type of support. Results indicate that crop area payments discourage the different labour demands in both countries, while environment and investment payments favour contract and hir...

  13. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  14. Joint research and development on toxic-material emergency response between ENEA and LLNL. 1982 progress report

    International Nuclear Information System (INIS)

    Gudiksen, P.; Lange, R.; Dickerson, M.; Sullivan, T.; Rosen, L.; Walker, H.; Boeri, G.B.; Caracciolo, R.; Fiorenza, R.

    1982-11-01

    A summary is presented of current and future cooperative studies between ENEA and LLNL researchers designed to develop improved real-time emergency response capabilities for assessing the environmental consequences resulting from an accidental release of toxic materials into the atmosphere. These studies include development and evaluation of atmospheric transport and dispersion models, interfacing of data processing and communications systems, supporting meteorological field experiments, and integration of radiological measurements and model results into real-time assessments

  15. Towards Certified Management of Financial Contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2014-01-01

    . The seminal work by Peyton-Jones and Eber on financial contracts shows how an algebraic approach to contract specification can be used for valuation of contracts (when combined with a model of the underlying observables) and for managing how contracts evolve under so-called fixings and decision......-taking, with the contracts eventually evaporating into the empty contract, for which no party have further obligations. The ideas have emerged into Eber's company LexiFi, which has become a leading software provider for a range of financial institutions, with all contract management operations centralised around a domain......Banks and financial institutions nowadays often use domain-specific languages (DSLs) for describing complex financial contracts, in particular, for specifying how asset transfers for a specific contract depend on underlying observables, such as interest rates, currency rates, and stock prices...

  16. Challenges in biotechnology at LLNL: from genes to proteins; TOPICAL

    International Nuclear Information System (INIS)

    Albala, J S

    1999-01-01

    This effort has undertaken the task of developing a link between the genomics, DNA repair and structural biology efforts within the Biology and Biotechnology Research Program at LLNL. Through the advent of the I.M.A.G.E. (Integrated Molecular Analysis of Genomes and their Expression) Consortium, a world-wide effort to catalog the largest public collection of genes, accepted and maintained within BBRP, it is now possible to systematically express the protein complement of these to further elucidate novel gene function and structure. The work has ensued in four phases, outlined as follows: (1) Gene and System selection; (2) Protein expression and purification; (3) Structural analysis; and (4) biological integration. Proteins to be expressed have been those of high programmatic interest. This includes, in particular, proteins involved in the maintenance of genome integrity, particularly those involved in the repair of DNA damage, including ERCC1, ERCC4, XRCC2, XRCC3, XRCC9, HEX1, APN1, p53, RAD51B, RAD51C, and RAD51. Full-length cDNA cognates of selected genes were isolated, and cloned into baculovirus-based expression vectors. The baculoviral expression system for protein over-expression is now well-established in the Albala laboratory. Procedures have been successfully optimized for full-length cDNA clining into expression vectors for protein expression from recombinant constructs. This includes the reagents, cell lines, techniques necessary for expression of recombinant baculoviral constructs in Spodoptera frugiperda (Sf9) cells. The laboratory has also generated a high-throughput baculoviral expression paradigm for large scale expression and purification of human recombinant proteins amenable to automation

  17. Author’s contract in the Albanian copyright law

    Directory of Open Access Journals (Sweden)

    Oltion Spiro

    2016-03-01

    Full Text Available The relation between the author and his/her artistic creation is very specific and at the same time a strong one. Such relation defies any property and affective connection that an individual may have with an object (Caron, 2011, 25. Copyright constitutes precisely the legal embodiment of the author’s intimate relationship with his/her work. Copyright is a plurality of legal provisions that belongs to the author of the work, in order to protect his/her ownership and eventually the commercial exploitation of such work. In this context, the author, through legal provisions and international conventions duly ratified by Albania, enjoys a relevant legal arsenal in order to defend his/her artistic works so that such works may have a live of its own (Vivant & Bruguière 2009, 23. One of these legal measures is the contract, which in legal doctrine is well known as the author’s contract. By means of such contract, the author has the right to distribute, reproduce, license or certify rights related to his/her artistic work. In this regard, the contract is an irreplaceable tool in the hands of the author to distribute the work and to give it an undeniable value, turning it into one of the most valuable intangible assets in civil circulation. The contract of the author, as the name indicates it, is a contract that obeys to the rules of civil law with respect to the quality of the parties, the characteristics of the object of the contract, its conclusion, the determination of remuneration and the term of duration. On the other hand, it is undeniable that the contract of the author contains rules which are not specifically contemplated by the Civil Code, such as rules relating to the form, interpretation and existence of some sui generis contracts provided in Law 9380 / 2005 “On copyright and related rights” (hereinafter referred to as “Law 9380/2005” or “Law on Copyright” as well as in the Draft Law On Authors Rights (hereinafter referred

  18. Test results from the LLNL 250 GHz CARM experiment

    International Nuclear Information System (INIS)

    Kulke, B.; Caplan, M.; Bubp, D.; Houck, T.; Rogers, D.; Trimble, D.; VanMaren, R.; Westenskow, G.; McDermott, D.B.; Luhmann, N.C. Jr.; Danly, B.

    1991-05-01

    We have completed the initial phase of a 250 GHz CARM experiment, driven by the 2 MeV, 1 kA, 30 ns induction linac at the LLNL ARC facility. A non-Brillouin, solid, electron beam is generated from a flux-threaded, thermionic cathode. As the beam traverses a 10 kG plateau produced by a superconducting magnet, ten percent of the beam energy is converted into rotational energy in a bifilar helix wiggler that produces a spiraling, 50 G, transverse magnetic field. The beam is then compressed to a 5 mm diameter as it drifts into a 30 kG plateau. For the present experiment, the CARM interaction region consisted of a single Bragg section resonator, followed by a smooth-bore amplifier section. Using high-pass filters, we have observed broadband output signals estimated to be at the several megawatt level in the range 140 to over 230 GHz. This is consistent with operation as a superradiant amplifier. Simultaneously, we also observed K a band power levels near 3 MW

  19. Test results from the LLNL 250 GHz CARM experiment

    International Nuclear Information System (INIS)

    Kulke, B.; Caplan, M.; Bubp, D.; Houck, T.; Rogers, D.; Trimble, D.; VanMaren, R.; Westenskow, G.; McDermott, D.B.; Luhmann, N.C. Jr.; Danly, B.

    1991-01-01

    The authors have completed the initial phase of a 250 GHz CARM experiment, driven by the 2 MeV, 1 kA, 30 ns induction linac at the LLNL ARC facility. A non-Brillouin, solid, electron beam is generated from a flux-threaded, thermionic cathode. As the beam traverses a 10 kG plateau produced by a superconducting magnet, ten percent of the beam energy is converted into rotational energy in a bifilar helix wiggler that produces a spiraling, 50 G, transverse magnetic field. The beam is then compressed to a 5 mm diameter as it drifts into a 30 kG plateau. For the present experiment, the CARM interaction region consisted of a single Bragg section resonator, followed by a smooth-bore amplifier section. Using high-pass filters, they have observed broadband output signals estimated to be at the several megawatt level in the range 140 to over 230 GHz. This is consistent with operation as a superradiant amplifier. Simultaneously, they also observed K a band power levels near 3 MW

  20. Status of the SLAC/LBL/LLNL B-Factory and the BaBar detector

    International Nuclear Information System (INIS)

    Oddone, P.

    1994-08-01

    The primary motivation of the Asymmetric B-Factory is the study of CP violation. The decay of B mesons and, in particular, the decay of neutral B mesons, offers the possibility of determining conclusively whether CP violation is part and parcel of the Standard Model with three generations of quarks and leptons. Alternatively, the authors may discover that CP violation lies outside the present framework. In this paper the authors briefly describe the physics reach of the SLAC/LBL/LLNL Asymmetric B-Factory, the progress on the machine design and construction, the progress on the detector design, and the schedule to complete both projects

  1. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.; Vertragshandbuch Stromwirtschaft. Praxisgerechte Gestaltung und rechtssichere Anwendung

    Energy Technology Data Exchange (ETDEWEB)

    Schoene, Thomas (ed.)

    2014-07-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  2. Claims in civil engineering contracts

    CERN Document Server

    Speirs, N A

    1999-01-01

    This paper considers claims arising during civil engineering construction contracts. The meaning of the word 'claim' is considered and its possible implications for additional cost and time to completion. The conditions of the construction contract selected will influence the risk apportionment between contractor and client and the price offered by the contractor for the work. Competitive bidding constraints and profit margins in the construction industry, however, may also influence the price offered. This in turn can influence the likelihood of claims arising. The client from his point of view is concerned to complete the work within an agreed time and budget. The circumstances under which claims may arise are reviewed in relation to typical conditions of contract. These circumstances are then related to the CERN LHC civil works. Ways of avoiding claims, where this is possible, are considered. Finally, the means of evaluation of claims and their settlement are considered.

  3. A historical perspective on fifteen years of laser damage thresholds at LLNL

    International Nuclear Information System (INIS)

    Rainer, F.; De Marco, F.P.; Staggs, M.C.; Kozlowski, M.R.; Atherton, L.J.; Sheehan, L.M.

    1993-01-01

    We have completed a fifteen year, referenced and documented compilation of more than 15,000 measurements of laser-induced damage thresholds (LIDT) conducted at the Lawrence Livermore National Laboratory (LLNL). These measurements cover the spectrum from 248 to 1064 nm with pulse durations ranging from < 1 ns to 65 ns and at pulse-repetition frequencies (PRF) from single shots to 6.3 kHz. We emphasize the changes in LIDTs during the past two years since we last summarized our database. We relate these results to earlier data concentrating on improvements in processing methods, materials, and conditioning techniques. In particular, we highlight the current status of anti-reflective (AR) coatings, high reflectors (HR), polarizers, and frequency-conversion crystals used primarily at 355 nm and 1064 nm

  4. Complex myograph allows the examination of complex muscle contractions for the assessment of muscle force, shortening, velocity, and work in vivo

    Directory of Open Access Journals (Sweden)

    Ruhschulte Hainer

    2008-07-01

    Full Text Available Abstract Background The devices used for in vivo examination of muscle contractions assess only pure force contractions and the so-called isokinetic contractions. In isokinetic experiments, the extremity and its muscle are artificially moved with constant velocity by the measuring device, while a tetanic contraction is induced in the muscle, either by electrical stimulation or by maximal voluntary activation. With these systems, experiments cannot be performed at pre-defined, constant muscle length, single contractions cannot be evaluated individually and the separate examination of the isometric and the isotonic components of single contractions is not possible. Methods The myograph presented in our study has two newly developed technical units, i.e. a. a counterforce unit which can load the muscle with an adjustable, but constant force and b. a length-adjusting unit which allows for both the stretching and the contraction length to be infinitely adjustable independently of one another. The two units support the examination of complex types of contraction and store the counterforce and length-adjusting settings, so that these conditions may be accurately reapplied in later sessions. Results The measurement examples presented show that the muscle can be brought to every possible pre-stretching length and that single isotonic or complex isometric-isotonic contractions may be performed at every length. The applied forces act during different phases of contraction, resulting into different pre- and after-loads that can be kept constant – uninfluenced by the contraction. Maximal values for force, shortening, velocity and work may be obtained for individual muscles. This offers the possibility to obtain information on the muscle status and to monitor its changes under non-invasive measurement conditions. Conclusion With the Complex Myograph, the whole spectrum of a muscle's mechanical characteristics may be assessed.

  5. 48 CFR 819.705 - Appeal of Contracting Officer decisions.

    Science.gov (United States)

    2010-10-01

    ... the Senior Procurement Executive (SPE) within 5 working days. The SPE shall have 15 working days to... decision. The contracting officer has 5 working days to reply to the challenge by either revising the... filed within 5 working days of receipt of the contracting officer's decision. The HCA has 5 working days...

  6. Contract Dynamics : Lessons from Empirical Analyses

    OpenAIRE

    Magali Chaudey

    2010-01-01

    Working paper GATE 2010-35; The recognition that contracts have a time dimension has given rise to a very abundant literature since the end of the 1980s. In such a dynamic context, the contract may take place over several periods and develop repeated interactions. Then, the principal topics of the analysis are commitment, reputation, memory and the renegotiation of the contract. Few papers have tried to apply the predictions of dynamic contract theory to data. The examples of applications int...

  7. The EBIT Calorimeter Spectrometer: a new, permanent user facility at the LLNL EBIT

    International Nuclear Information System (INIS)

    Porter, F.S.; Beiersdorfer, P.; Brown, G.V.; Doriese, W.; Gygax, J.; Kelley, R.L.; Kilbourne, C.A.; King, J.; Irwin, K.; Reintsema, C.; Ullom, J.

    2007-01-01

    The EBIT Calorimeter Spectrometer (ECS) is currently being completed and will be installed at the EBIT facility at the Lawrence Livermore National Laboratory in October 2007. The ECS will replace the smaller XRS/EBIT microcalorimeter spectrometer that has been in almost continuous operation since 2000. The XRS/EBIT was based on a spare laboratory cryostat and an engineering model detector system from the Suzaku/XRS observatory program. The new ECS spectrometer was built to be a low maintenance, high performance implanted silicon microcalorimeter spectrometer with 4 eV resolution at 6 keV, 32 detector channels, 10 (micro)s event timing, and capable of uninterrupted acquisition sessions of over 60 hours at 50 mK. The XRS/EBIT program has been very successful, producing many results on topics such as laboratory astrophysics, atomic physics, nuclear physics, and calibration of the spectrometers for the National Ignition Facility. The ECS spectrometer will continue this work into the future with improved spectral resolution, integration times, and ease-of-use. We designed the ECS instrument with TES detectors in mind by using the same highly successful magnetic shielding as our laboratory TES cryostats. This design will lead to a future TES instrument at the LLNL EBIT. Here we discuss the legacy of the XRS/EBIT program, the performance of the new ECS spectrometer, and plans for a future TES instrument.

  8. The Mediational Role of Relational Psychological Contract in Belief in a Zero-Sum Game and Work Input Attitude Dependency

    Directory of Open Access Journals (Sweden)

    Adamska Krystyna

    2015-12-01

    Full Text Available The purpose of this study was to investigate the mediational role of relational psychological contract in social beliefs and work input attitude dependency. We analyzed data taken from employees (N = 258 in four different organizations operating in the Pomeranian market.

  9. Contract & agency labour: beyond self-regulation?

    OpenAIRE

    Cotton, Elizabeth

    2010-01-01

    A paper about the regulation of contract labour. Academic and legal aspects as well as case studies of global union federation work to organise and regulate contract labour in Thailand, Pakistan, Colombia, South Korea and at international level.

  10. Design and construction of a 208-L drum containing representative LLNL transuranic and low-level wastes

    International Nuclear Information System (INIS)

    Camp, D.C.; Pickering, J.; Martz, H.E.

    1994-01-01

    At the Lawrence Livermore National Laboratory (LLNL), we are developing the nondestructive analysis (NDA) technique of active (A) computed tomography (CT) to measure waste matrix attenuation as a function of gamma-ray energy (ACT); and passive. (P) Cr to locate and identify all gamma-ray emitting isotopes within a waste container. Coupling the ACT and PCT results will quantify each isotope identified, thereby categorize the amount of radioactivity within waste drums having volumes up to 416-liters (L), i.e., 110-gallon drums

  11. Summary Statistics for Homemade ?Play Dough? -- Data Acquired at LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Kallman, J S; Morales, K E; Whipple, R E; Huber, R D; Martz, A; Brown, W D; Smith, J A; Schneberk, D J; Martz, Jr., H E; White, III, W T

    2010-03-11

    Using x-ray computerized tomography (CT), we have characterized the x-ray linear attenuation coefficients (LAC) of a homemade Play Dough{trademark}-like material, designated as PDA. Table 1 gives the first-order statistics for each of four CT measurements, estimated with a Gaussian kernel density estimator (KDE) analysis. The mean values of the LAC range from a high of about 2700 LMHU{sub D} 100kVp to a low of about 1200 LMHUD at 300kVp. The standard deviation of each measurement is around 10% to 15% of the mean. The entropy covers the range from 6.0 to 7.4. Ordinarily, we would model the LAC of the material and compare the modeled values to the measured values. In this case, however, we did not have the detailed chemical composition of the material and therefore did not model the LAC. Using a method recently proposed by Lawrence Livermore National Laboratory (LLNL), we estimate the value of the effective atomic number, Z{sub eff}, to be near 10. LLNL prepared about 50mL of the homemade 'Play Dough' in a polypropylene vial and firmly compressed it immediately prior to the x-ray measurements. We used the computer program IMGREC to reconstruct the CT images. The values of the key parameters used in the data capture and image reconstruction are given in this report. Additional details may be found in the experimental SOP and a separate document. To characterize the statistical distribution of LAC values in each CT image, we first isolated an 80% central-core segment of volume elements ('voxels') lying completely within the specimen, away from the walls of the polypropylene vial. All of the voxels within this central core, including those comprised of voids and inclusions, are included in the statistics. We then calculated the mean value, standard deviation and entropy for (a) the four image segments and for (b) their digital gradient images. (A digital gradient image of a given image was obtained by taking the absolute value of the difference

  12. Work Hours as a Moderator of the Relationship between Developmental Human Resource Management Practices and the Psychological Contract: A Multilevel Investigation

    OpenAIRE

    Håkensen, Katrine

    2014-01-01

    Purpose & background – The purpose of this study was to examine if part-time and full-time employees differ in terms of psychological contract content according to level of developmental HRM practices. The study adds to an ongoing research project Organizational antecedents of psychological contracts and work-related outcomes , run by Sabine Raeder, University of Oslo in cooperation with José María Peiró, University of Valencia, Spain. Design & methodology – A survey of 463 employees from 35...

  13. Hydrologic Resources Management Program and Underground Test Area Project FY2005 Progress Report

    International Nuclear Information System (INIS)

    Eaton, G F; Genetti, V; Hu, Q; Hudson, G B; Kersting, A B; Lindvall, R E; Moran, J E; Nimz, G J; Ramon, E C; Rose, T P; Shuller, L; Williams, R W; Zavarin, M; Zhao, P

    2007-01-01

    This report describes FY 2005 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains five chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E and E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN)

  14. Book-Smart, Not Street-Smart: Blockchain-Based Smart Contracts and The Social Workings of Law

    OpenAIRE

    Karen E. C. Levy

    2017-01-01

    This paper critiques blockchain-based “smart contracts,” which aim to automatically and securely execute obligations without reliance on a centralized enforcement authority. Though smart contracts do have some features that might serve the goals of social justice and fairness, I suggest that they are based on a thin conception of what law does, and how it does it. Smart contracts focus on the technical form of contract to the exclusion of the social contexts within which contracts operate, an...

  15. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  16. Who gets fired, who gets re-hired: the role of workers' contract, age, health, work ability, performance, work satisfaction and employee investments.

    Science.gov (United States)

    Wagenaar, Alfred F; Kompier, Michiel A J; Houtman, Irene L D; van den Bossche, Seth N J; Taris, Toon W

    2015-04-01

    Many workers have been dismissed in the past few years, either becoming unemployed or finding re-employment. The current study examined whether dismissal and its follow-up for the employee (re-employment versus unemployment) could be predicted from workers' employment contract and age, and their health status, work ability, work performance, work satisfaction and employee investments at baseline. Our sample comprised a selection of participants from the Netherlands Working Conditions Survey 2010 who participated in a follow-up questionnaire in 2012 (N = 2,644). We used logistic regression analyses to test our hypotheses. Temporary employment, low health status, low work ability, poor work performance, low work satisfaction and no employee investments in terms of training predicted future dismissal. Furthermore, older workers and workers reporting decreased work performance due to impaired health at baseline had a lower chance of re-employment after being dismissed. Interestingly, after taking into account all predictors, former temporary workers without permanent employment prospects had much better chances of re-employment after their dismissal than former permanent workers. Temporary, less healthy, low work ability, poor performing, dissatisfied and "under-invested" workers are at risk for dismissal, whereas older and less healthy workers are (also) at risk for long-term unemployment after being dismissed.

  17. Housing and bed and board contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2011-01-01

    Full Text Available In this work not only legal nature of catering services is analyzed, but also legal position of parties in it. Catering contract (Housing and Bed and Board Contract is unnamed in our country and the main source of law for this contract are business practices and usage. A lot of attention is paid to this question. Lack of legal norms for this area is general characteristic for most of the tourism contracts. In this contract its title is also debatable because term 'catering services' is not usually used in practice. Although this contract is unnamed in Comparative Law ,in tourist more developed countries there are more codified business practices from this area and there is more Case Law. Having in mind development of tourist economy adequate legal conditions in tourism contract are expected.

  18. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  19. 48 CFR 970.2304-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ..., Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2304-2 Contract clause. Link to an amendment published at 75 FR 57695, Sept. 22, 2010. The contracting officer shall insert the...

  20. Summary of International Waste Management Programs (LLNL Input to SNL L3 MS: System-Wide Integration and Site Selection Concepts for Future Disposition Options for HLW)

    Energy Technology Data Exchange (ETDEWEB)

    Greenberg, Harris R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Blink, James A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Halsey, William G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sutton, Mark [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2011-08-11

    The Used Fuel Disposition Campaign (UFDC) within the Department of Energy’s Office of Nuclear Energy (DOE-NE) Fuel Cycle Technology (FCT) program has been tasked with investigating the disposal of the nation’s spent nuclear fuel (SNF) and high-level nuclear waste (HLW) for a range of potential waste forms and geologic environments. This Lessons Learned task is part of a multi-laboratory effort, with this LLNL report providing input to a Level 3 SNL milestone (System-Wide Integration and Site Selection Concepts for Future Disposition Options for HLW). The work package number is: FTLL11UF0328; the work package title is: Technical Bases / Lessons Learned; the milestone number is: M41UF032802; and the milestone title is: “LLNL Input to SNL L3 MS: System-Wide Integration and Site Selection Concepts for Future Disposition Options for HLW”. The system-wide integration effort will integrate all aspects of waste management and disposal, integrating the waste generators, interim storage, transportation, and ultimate disposal at a repository site. The review of international experience in these areas is required to support future studies that address all of these components in an integrated manner. Note that this report is a snapshot of nuclear power infrastructure and international waste management programs that is current as of August 2011, with one notable exception. No attempt has been made to discuss the currently evolving world-wide response to the tragic consequences of the earthquake and tsunami that devastated Japan on March 11, 2011, leaving more than 15,000 people dead and more than 8,000 people missing, and severely damaging the Fukushima Daiichi nuclear power complex. Continuing efforts in FY 2012 will update the data, and summarize it in an Excel spreadsheet for easy comparison and assist in the knowledge management of the study cases.

  1. Construction safety program for the National Ignition Facility Appendix A: Safety Requirements

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    These rules apply to all LLNL employees, non-LLNL employees (including contract labor, supplemental labor, vendors, personnel matrixed/assigned from other National Laboratories, participating guests, visitors and students) and construction contractors/subcontractors. The General Safety and Health rules shall be used by management to promote accident prevention through indoctrination, safety and health training and on-the-job application. As a condition for contracts award, all contractors and subcontractors and their employees must certify on Form S ampersand H A-1 that they have read and understand, or have been briefed and understand, the National Ignition Facility OCIP Project General Safety Rules

  2. Construction safety program for the National Ignition Facility Appendix A: Safety Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-01-14

    These rules apply to all LLNL employees, non-LLNL employees (including contract labor, supplemental labor, vendors, personnel matrixed/assigned from other National Laboratories, participating guests, visitors and students) and construction contractors/subcontractors. The General Safety and Health rules shall be used by management to promote accident prevention through indoctrination, safety and health training and on-the-job application. As a condition for contracts award, all contractors and subcontractors and their employees must certify on Form S & H A-1 that they have read and understand, or have been briefed and understand, the National Ignition Facility OCIP Project General Safety Rules.

  3. Modifications to LLNL Plutonium Packaging Systems (PuPS) to achieve ASME VIII UW-13.2(d) Requirements for the DOE Standard 3013-00 Outer Can Weld

    International Nuclear Information System (INIS)

    Riley, D; Dodson, K

    2001-01-01

    The Lawrence Livermore National Laboratory (LLNL) Plutonium Packaging System (PuPS) prepares packages to meet the DOE Standard 3013 (Reference 1). The PuPS equipment was supplied by the British Nuclear Fuels Limited (BNFL). The DOE Standard 3013 requires that the welding of the Outer Can meets ASME Section VIII Division 1 (Reference 2). ASME Section VIII references to ASME Section IX (Reference 3) for most of the welding requirements, but UW-13.2 (d) of Section VIII requires a certain depth and width of the weld. In this document the UW-13.2(d) requirement is described as the (a+b)/2t s ratio. This ratio has to be greater than or equal to one to meet the requirements of UW-13.2(d). The Outer Can welds had not been meeting this requirement. Three methods are being followed to resolve this issue: (1) Modify the welding parameters to achieve the requirement, (2) Submit a weld case to ASME that changes the UW-13.2(d) requirement for their review and approval, and (3) Change the requirements in the DOE-STD-3013. Each of these methods are being pursued. This report addresses how the first method was addressed for the LLNL PuPS. The experimental work involved adjusting the Outer Can rotational speed and the power applied to the can. These adjustments resulted in being able to achieve the ASME VIII, UW-13.2(d) requirement

  4. A Guide to Performance Contracting. A Presentation and Discussion of the Multiple Considerations Regarding Contracted Services in Local Education Agencies.

    Science.gov (United States)

    Adams, John W.; Kitchak, Karen H.

    This report provides a framework for evaluating the use of performance contracts. It serves as a working guide for those who are considering or are committed to performance contracts with public or private organizations. The topics cover (1) the theoretical basis and rationale of performance contracting, (2) the procurement model and the request…

  5. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  6. A probabilistic risk assessment of the LLNL Plutonium Facility's evaluation basis fire operational accident. Revision 1

    International Nuclear Information System (INIS)

    Brumburgh, G.P.

    1995-01-01

    The Lawrence Livermore National Laboratory (LLNL) Plutonium Facility conducts numerous programmatic activities involving plutonium to include device fabrication, development of improved and/or unique fabrication techniques, metallurgy research, and laser isotope separation. A Safety Analysis Report (SAR) for the building 332 Plutonium Facility was completed in July 1994 to address operational safety and acceptable risk to employees, the public, government property, and the environmental. This paper outlines the PRA analysis of the Evaluation Basis Fire (EBF) operational accident. The EBF postulates the worst-case programmatic impact event for the Plutonium Facility

  7. Interim report on modeling sorption with EQ3/6

    International Nuclear Information System (INIS)

    Viani, B.

    1988-01-01

    Reversible, equilibrium models of sorption to be incorporated into the EQ3/6 geochemical modeling package are summarized. Empirical sorption models as formulated in linear, Langmuir, and Freundlich isotherms will be developed as options to EQ3/6. This work will be done at LLNL. Options for modeling sorption using surface- complexation constructs (diffuse, constant capacitance, and triple-layer models) will also be developed. Development of the surface-complexation options will require part of the work be done under contract. 27 refs., 1 fig

  8. UNIDROITED POSITION AS A SOURCE OF CONTRACT LAW IN THE FUTURE OF INDONESIAN CONTRACT LAW AMANDEMENT

    Directory of Open Access Journals (Sweden)

    N. Ike Kusmiati

    2018-01-01

    Full Text Available [Unidroited Position As A Source Of Contract Law In The Future Of Indonesian Contract Law Amandement] Business transaction often faced the issue of ensuring that the rights and obligation are fulfilled as the agreement as agreed, especially when facing the difficulties of the rights and obligation of the parties due to different legal system between countries. Thereore, to answer the problems  the parties will seek legal sources, namely book III of the Civil Code in addition to studying and understanding the principles of internasional commercial contract law, namely UNIDROIT which contains principles that can be adopted as one of the works that seek Standarization of contract law to encourage the harmonization of commercial law international efforts to bring together different business actors between countries, so that the same legal basis is required in the coming renewal of Indonesia contract law. Keyword : Position, UNIDROIT, Law, Contract, Indonesia.

  9. 30 CFR 881.6 - Project contract.

    Science.gov (United States)

    2010-07-01

    ... contractors or suppliers for the construction, installation, services or work to be performed. (b) Project... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a...

  10. 48 CFR 1552.209-74 - Limitation of future contracting.

    Science.gov (United States)

    2010-10-01

    ... supports EPA's performance of Superfund Headquarters policy work including support for the analysis and... contracts, and Superfund Technical and Analytical support contracts. (d) To the extent that the work under... nondiscretionary technical or engineering services not specifically listed above, including laboratory analysis...

  11. Load Designs For MJ Dense Plasma Foci

    Science.gov (United States)

    Link, A.; Povlius, A.; Anaya, R.; Anderson, M. G.; Angus, J. R.; Cooper, C. M.; Falabella, S.; Goerz, D.; Higginson, D.; Holod, I.; McMahon, M.; Mitrani, J.; Koh, E. S.; Pearson, A.; Podpaly, Y. A.; Prasad, R.; van Lue, D.; Watson, J.; Schmidt, A. E.

    2017-10-01

    Dense plasma focus (DPF) Z-pinches are compact pulse power driven devices with coaxial electrodes. The discharge of DPF consists of three distinct phases: first generation of a plasma sheath, plasma rail gun phase where the sheath is accelerated down the electrodes and finally an implosion phase where the plasma stagnates into a z-pinch geometry. During the z-pinch phase, DPFs can produce MeV ion beams, x-rays and neutrons. Megaampere class DPFs with deuterium fills have demonstrated neutron yields in the 1012 neutrons/shot range with pulse durations of 10-100 ns. Kinetic simulations using the code Chicago are being used to evaluate various load configurations from initial sheath formation to the final z-pinch phase for DPFs with up to 5 MA and 1 MJ coupled to the load. Results will be presented from the preliminary design simulations. LLNL-ABS-734785 This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory (LLNL) under Contract DE-AC52-07NA27344 and with support from the Computing Grand Challenge program at LLNL.

  12. LLNL's Regional Seismic Discrimination Research

    International Nuclear Information System (INIS)

    Hanley, W; Mayeda, K; Myers, S; Pasyanos, M; Rodgers, A; Sicherman, A; Walter, W

    1999-01-01

    As part of the Department of Energy's research and development effort to improve the monitoring capability of the planned Comprehensive Nuclear-Test-Ban Treaty international monitoring system, Lawrence Livermore Laboratory (LLNL) is testing and calibrating regional seismic discrimination algorithms in the Middle East, North Africa and Western Former Soviet Union. The calibration process consists of a number of steps: (1) populating the database with independently identified regional events; (2) developing regional boundaries and pre-identifying severe regional phase blockage zones; (3) measuring and calibrating coda based magnitude scales; (4a) measuring regional amplitudes and making magnitude and distance amplitude corrections (MDAC); (4b) applying the DOE modified kriging methodology to MDAC results using the regionalized background model; (5) determining the thresholds of detectability of regional phases as a function of phase type and frequency; (6) evaluating regional phase discriminant performance both singly and in combination; (7) combining steps 1-6 to create a calibrated discrimination surface for each stations; (8) assessing progress and iterating. We have now developed this calibration procedure to the point where it is fairly straightforward to apply earthquake-explosion discrimination in regions with ample empirical data. Several of the steps outlined above are discussed in greater detail in other DOE papers in this volume or in recent publications. Here we emphasize the results of the above process: station correction surfaces and their improvement to discrimination results compared with simpler calibration methods. Some of the outstanding discrimination research issues involve cases in which there is little or no empirical data. For example in many cases there is no regional nuclear explosion data at IMS stations or nearby surrogates. We have taken two approaches to this problem, first finding and using mining explosion data when available, and

  13. 48 CFR 42.705-1 - Contracting officer determination procedure.

    Science.gov (United States)

    2010-10-01

    ... a multidivisional corporation under the cognizance of a corporate administrative contracting officer... organization. (2) Business units not under the cognizance of a corporate administrative contracting officer... accounting system capabilities. The contractor, contracting officer, and auditor must work together to make...

  14. LLNL's Big Science Capabilities Help Spur Over $796 Billion in U.S. Economic Activity Sequencing the Human Genome

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Jeffrey S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-07-28

    LLNL’s successful history of taking on big science projects spans beyond national security and has helped create billions of dollars per year in new economic activity. One example is LLNL’s role in helping sequence the human genome. Over $796 billion in new economic activity in over half a dozen fields has been documented since LLNL successfully completed this Grand Challenge.

  15. Production of High Harmonic X-Ray Radiation from Non-linear Thomson at LLNL PLEIADES

    CERN Document Server

    Lim, Jae; Betts, Shawn; Crane, John; Doyuran, Adnan; Frigola, Pedro; Gibson, David J; Hartemann, Fred V; Rosenzweig, James E; Travish, Gil; Tremaine, Aaron M

    2005-01-01

    We describe an experiment for production of high harmonic x-ray radiation from Thomson backscattering of an ultra-short high power density laser by a relativistic electron beam at the PLEIADES facility at LLNL. In this scenario, electrons execute a “figure-8” motion under the influence of the high-intensity laser field, where the constant characterizing the field strength is expected to exceed unity: $aL=e*EL/m*c*ωL ≥ 1$. With large $aL$ this motion produces high harmonic x-ray radiation and significant broadening of the spectral peaks. This paper is intended to give a layout of the PLEIADES experiment, along with progress towards experimental goals.

  16. High-pressure phase diagrams of liquid CO2 and N2

    Science.gov (United States)

    Boates, Brian; Bonev, Stanimir

    2011-06-01

    The phase diagrams of liquid CO2 and N2 have been investigated using first-principles theory. Both materials exhibit transitions to conducting liquids at high temperatures (T) and relatively modest pressures (P). Furthermore, both liquids undergo polymerization phase transitions at pressures comparable to their solid counterparts. The liquid phase diagrams have been divided into several regimes through a detailed analysis of changes in bonding, as well as structural and electronic properties for pressures and temperatures up to 200 GPa and 10 000 K, respectively. Similarities and differences between the high- P and T behavior of these fluids will be discussed. Calculations of the Hugoniot are in excellent agreement with available experimental data. Work supported by NSERC, LLNL, and the Killam Trusts. Prepared by LLNL under Contract DE-AC52-07NA27344.

  17. When I'm 64: Psychological contract breach, work motivation and the moderating roles of future time perspective and regulatory focus

    NARCIS (Netherlands)

    Lange, A.H. de; Bal, P.M.; Heijden, B.I.J.M. van der; Jong, N. de; Schaufeli, W.B.

    2011-01-01

    There is an increasing need for managers to understand what motivates younger versus older workers to continue work within their company. We believe that this two-wave study among 90 Dutch employees is the first to examine: (1) the cross-lagged relationships between breach of psychological contract

  18. When I'm 64 : Psychological contract breach, work motivation and the moderating roles of future time perspective and regulatory focus

    NARCIS (Netherlands)

    de Lange, Annet H.; Bal, P. Matthijs; Van der Heijden, Beatrice I. J. M.; de Jong, Nicole; Schaufeli, Wilmar B.

    2011-01-01

    There is an increasing need for managers to understand what motivates younger versus older workers to continue work within their company. We believe that this two-wave study among 90 Dutch employees is the first to examine: (1) the cross-lagged relationships between breach of psychological contract

  19. New Perils for the Contract Ethnographer.

    Science.gov (United States)

    Fetterman, David M.

    1981-01-01

    Conditions of contract research may lead some workers to ignore publication rights of colleagues whose reports are of limited circulation. The author presents a case example of how this process occurred with the use of his own work and argues for rigorous ethical standards in the publication of contract research results. (Author/GC)

  20. Proposal for the Award of Two Contracts for the Technical Services for Work on Components of CERN Particle Accelerators and High Energy Physics Experiments

    CERN Document Server

    2003-01-01

    This document concerns the award of two contracts for the technical services for work on components of CERN particle accelerators and high energy physics experiments. Following a market survey carried out among 73 firms in fourteen Member States, a call for tenders (IT-3156/SPL) was sent on 4 November 2002 to three consortia in four Member States. By the closing date, CERN had received tenders from the three consortia. The Finance Committee is invited to agree to the negotiation of two contracts with: 1) the consortium SERCO FACILITIES MANAGEMENT (NL) - GERARD PERRIER INDUSTRIE (FR) - INEO ALPES (FR), the lowest bidder, for approximately 55% of the technical services for work on components of CERN particle accelerators and high energy physics experiments, for an initial period of five years and for a total amount not exceeding 37 435 270 euros (54 902 500 Swiss francs), subject to revision for inflation from 1 January 2005. The contract will include options for two one-year extensions beyond the initial five-...

  1. Contract engineers cut costs, and flexibility

    International Nuclear Information System (INIS)

    Bhargava, V.M.

    1991-01-01

    Today's rapid expansion of technology is an important reason for considering hiring contract engineering labor for your power plant because technical specialization is an important aspect of the contract engineering industry. This paper reports that another reason is addressing peak work loads. Any amount of technical assistance is available to assist in meeting schedules. Although a typical human resources department of a utility or architect/engineer may contain a few hundred active resumes, a contract engineering firm may have upwards of 40,000 resumes on file from all parts of the country. Because contract workers know that contract agencies keep abreast of client needs, they are more apt to forward updated resumes to such agencies. Used properly, a contract engineering company's services will augment the efforts of a human resources group and, in the case of some smaller companies, actually take the place of all internal recruiting efforts

  2. Government Health Care Contract Incentives: Making Managed Health Care Work in Federal Government Procurements

    National Research Council Canada - National Science Library

    Teskey, Mark S

    1999-01-01

    Contracting for managed health care systems is a complex undertaking. The current TRICARE contracts captured all the important parts of the system and ensured detailed compliance with the many system requirements...

  3. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  4. 48 CFR 36.517 - Layout of work.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Layout of work. 36.517... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.517 Layout of work. The contracting officer shall insert the clause at 52.236-17, Layout of Work, in solicitations and contracts when...

  5. RENEGOTIATION MINING CONTRACT: LEGAL PARADIGM RECONSTRUCTION EFFORTS

    Directory of Open Access Journals (Sweden)

    Marilang -

    2014-07-01

    Full Text Available Renegotiation contract mining is not a priori notion that was born but is driven by the fact that empirical Work Contract (KK and coal mining concessions of the Works Agreement (Cca that are valid for this resulted in profits which are not comparable between countries with investors (domestic and foreign. In addition, Law No. 4 of 2009 about Mineral and Coal Mining (minerba through article 169 have been injected that though the mining contracts during the validity of this, still respected until the end, however, if the implementation of these contracts give rise to distortions for the national interest, then the Government must encourage the investors to do Renegotiation against existing contracts to comply with legislation minerba forever within a period of one year since the enactment of the legislation this minerba. Renegotiation mining contracts that have been approved on the fact of the matter is simply an attempt to reconstruct the ruling paradigm, so with that paradigm shift, both parties can reach the intersection for the benefit of both parties, i.e. the parties proportionately Indonesia suffered no losses on the one hand, and the benefit of the domestic and foreign investors remain in reasonable limits on the other. 

  6. Estimate of aircraft crash hit frequencies on to facilities at the Lawrence Livermore National Laboratory (LLNL) Site 200

    International Nuclear Information System (INIS)

    Kimura, C.Y.

    1997-01-01

    Department of Energy (DOE) nuclear facilities are required by DOE Order 5480.23, Section 8.b.(3)(k) to consider external events as initiating events to accidents within the scope of their Safety Analysis Reports (SAR). One of the external initiating events which should be considered within the scope of a SAR is an aircraft accident, i.e., an aircraft crashing into the nuclear facility with the related impact and fire leading to penetration of the facility and to the release of radioactive and/or hazardous materials. This report presents the results of an Aircraft Crash Frequency analysis performed for the Materials Management Area (MMA), and the National Ignition Facility (NIF) at the Lawrence Livermore National Laboratory (LLNL) Site 200. The analysis estimates only the aircraft crash hit frequency on to the analyzed facilities. No initial aircraft crash hit frequency screening structural response calculations of the facilities to the aircraft impact, or consequence analysis of radioactive/hazardous materials released following the aircraft impact are performed. The method used to estimate the aircraft crash hit frequencies on to facilities at the Lawrence Livermore National Laboratory (LLNL) generally follows the procedure given by the DOE Standard 3014-96 on Aircraft Crash Analysis. However, certain adjustments were made to the DOE Standard procedure because of the site specific fight environment or because of facility specific characteristics

  7. Informal contracting between and within firms

    Directory of Open Access Journals (Sweden)

    Ricard Gil

    Full Text Available Abstract While informal contracts are widely used in modern economies, limited systematic empirical evidence is available to researchers and policy makers. This paper aims to fill the gap by discussing a selected sample of empirical works through the lens of a theoretical framework that clarifies the role of informal contracts. We also highlight unexplored research opportunities offered by more recent theoretical models that investigate how informal contracts are built over time, how they are subject to path dependency, and how relational rents are created, and are awaiting empirical analysis.

  8. Consistency Checking of Web Service Contracts

    DEFF Research Database (Denmark)

    Cambronero, M. Emilia; Okika, Joseph C.; Ravn, Anders Peter

    2008-01-01

    Behavioural properties are analyzed for web service contracts formulated in Business Process Execution Language (BPEL) and Choreography Description Language (CDL). The key result reported is an automated technique to check consistency between protocol aspects of the contracts. The contracts...... are abstracted to (timed) automata and from there a simulation is set up, which is checked using automated tools for analyzing networks of finite state processes. Here we use the Concurrency Work Bench. The proposed techniques are illustrated with a case study that include otherwise difficult to analyze fault...

  9. 48 CFR 9.507-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.507-2 Contract clause. (a) If..., for example, when the first production contract using the contractor's specifications or work statement is awarded, or it might extend through the entire life of a system for which the contractor has...

  10. Nonstandard Work, Substandard Jobs. Flexible Work Arrangements in the U.S.

    Science.gov (United States)

    Kalleberg, Arne L.; Rasell, Edith; Cassirer, Naomi; Reskin, Barbara F.; Hudson, Ken; Webster, David; Appelbaum, Eileen; Spalter-Roth, Roberta M.

    Nonstandard work arrangements (independent contracting, working for a temporary help agency, contract or on-call work, day labor, self-employment, and regular part-time employment) are growing more common in the United States. In 1995, more than 29 percent of all jobs were in nonstandard work arrangements. A study of these jobs and the…

  11. Galilean contractions of W-algebras

    Directory of Open Access Journals (Sweden)

    Jørgen Rasmussen

    2017-09-01

    Full Text Available Infinite-dimensional Galilean conformal algebras can be constructed by contracting pairs of symmetry algebras in conformal field theory, such as W-algebras. Known examples include contractions of pairs of the Virasoro algebra, its N=1 superconformal extension, or the W3 algebra. Here, we introduce a contraction prescription of the corresponding operator-product algebras, or equivalently, a prescription for contracting tensor products of vertex algebras. With this, we work out the Galilean conformal algebras arising from contractions of N=2 and N=4 superconformal algebras as well as of the W-algebras W(2,4, W(2,6, W4, and W5. The latter results provide evidence for the existence of a whole new class of W-algebras which we call Galilean W-algebras. We also apply the contraction prescription to affine Lie algebras and find that the ensuing Galilean affine algebras admit a Sugawara construction. The corresponding central charge is level-independent and given by twice the dimension of the underlying finite-dimensional Lie algebra. Finally, applications of our results to the characterisation of structure constants in W-algebras are proposed.

  12. Positive and negative implications entailed by fixed-term employment contracts

    Directory of Open Access Journals (Sweden)

    Mihaela-Emilia Marica

    2018-03-01

    Full Text Available Generally, fixed-term employment contracts are seen as a stepping stone to permanent employment; they have become popular among the flexible forms of work contracts, and are the object of an increasing number of debates and assessments, investigating both the respective legislation and the specific consequences on the parties concluding a fixed-term employment contract. Despite the positive aspects of temporary employment – a positive effect on the rate of employment, and the common perception of such contracts as a preliminary step to permanent employment, as well as the flexibility they bring to the labor market – one cannot ignore the negative implications of fixed-term contracts on the nature of the employment relationship, the system of social protection, the working conditions, the economic security, and the job stability. Based on these considerations, the present paper investigates the advantages and disadvantages of the individual fixed-term employment contract from the standpoints of both employers and employees. Obviously, this approach aims to explore the usefulness and importance of these contract types, as means for balancing the needs of employers and employees on the labor market, and for identifying concrete instances that justify the liberalization of fixed-term employment, despite all the inherent risks entailed by any type of non-standard work: lack of job security; reduced social protection and security for those concluding such a contract.

  13. Non-turnkey contract

    International Nuclear Information System (INIS)

    Shimoyama, Shunji

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face with troubles and difficulties during construction of the first nuclear power station, she might have chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf. (orig./FW) [de

  14. Non-turnkey contract

    Energy Technology Data Exchange (ETDEWEB)

    Shimoyama, S

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face troubles and difficulties during construction of the first nuclear power station, she might have a chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf.

  15. Under-Optimized Smart Contracts Devour Your Money

    OpenAIRE

    Chen, Ting; Li, Xiaoqi; Luo, Xiapu; Zhang, Xiaosong

    2017-01-01

    Smart contracts are full-fledged programs that run on blockchains (e.g., Ethereum, one of the most popular blockchains). In Ethereum, gas (in Ether, a cryptographic currency like Bitcoin) is the execution fee compensating the computing resources of miners for running smart contracts. However, we find that under-optimized smart contracts cost more gas than necessary, and therefore the creators or users will be overcharged. In this work, we conduct the first investigation on Solidity, the recom...

  16. 48 CFR 227.7103-6 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... software or computer software documentation (see 227.72), commercial items (see 227.7102-3), existing works...-engineer and construction contracts. (b)(1) Use the clause at 252.227-7013 with its Alternate I in research... Software Previously Delivered to the Government, in solicitations when the resulting contract will require...

  17. Inertial confinement fusion target component fabrication and technology development support: Annual report, October 1, 1995--September 30, 1996

    International Nuclear Information System (INIS)

    Hoppe, M.

    1997-02-01

    On December 30, 1990, the U.S. Department of Energy entered into a contract with General Atomics (GA) to be the Inertial Confinement Fusion (ICF) Target Component Fabrication and Technology Development Support contractor. In September 1995 this contract ended and a second contract was issued for us to continue this ICF target support work. This report documents the technical activities of the period October 1, 1995 through September 30, 1996. During this period, GA and our partners WJ Schafer Associates (WJSA) and Soane Technologies, Inc. (STI) were assigned 14 formal tasks in support of the Inertial Confinement Fusion program and its five laboratories. A portion of the effort on these tasks included providing direct open-quotes Onsite Supportclose quotes at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), and Sandia National Laboratory Albuquerque (SNLA). We fabricated and delivered over 800 gold-plated hohlraum mandrels to LLNL, LANL and SNLA. We produced nearly 1,200 glass and plastic target capsules for LLNL, LANL, SNLA and University of Rochester/Laboratory for Laser Energetics (UR/LLE). We also delivered over 100 flat foil targets for Naval Research Lab (NRL) and SNLA in FY96. This report describes these target fabrication activities and the target fabrication and characterization development activities that made the deliveries possible. The ICF program is anticipating experiments at the OMEGA laser and the National Ignition Facility (NIF) which will require capsules containing cryogenic layered D 2 or deuterium-tritium (DT) fuel. We are part of the National Cryogenic Target Program to create and demonstrate viable ways to generate and characterize cryogenic layers. Substantial progress has been made on ways to both create and characterize viable layers. During FY96, significant progress was made in the design of the OMEGA Cryogenic Target System that will field cryogenic targets on OMEGA

  18. 48 CFR 536.570-5 - Working hours.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Working hours. 536.570-5... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 536.570-5 Working hours. Insert 552.236-74, Working Hours, in solicitations and contracts if construction, dismantling...

  19. Status of experiments at LLNL on high-power X-band microwave generators

    International Nuclear Information System (INIS)

    Houck, T.L.; Westenskow, G.A.

    1994-01-01

    The Microwave Source Facility at the Lawrence Livermore National Laboratory (LLNL) is studying the application of induction accelerator technology to high-power microwave generators suitable for linear collider power sources. The authors report on the results of two experiments, both using the Choppertron's 11.4 GHz modulator and a 5-MeV, 1-kA induction beam. The first experimental configuration has a single traveling wave output structure designed to produce in excess of 300 MW in a single fundamental waveguide. This output structure consists of 12 individual cells, the first two incorporating de-Q-ing circuits to dampen higher order resonant modes. The second experiment studies the feasibility of enhancing beam to microwave power conversion by accelerating a modulated beam with induction cells. Referred to as the ''Reacceleration Experiment,'' this experiment consists of three traveling-wave output structures designed to produce about 125 MW per output and two induction cells located between the outputs. Status of current and planned experiments are presented

  20. Summary of LLNL's accomplishments for the FY93 Waste Processing Operations Program

    International Nuclear Information System (INIS)

    Grasz, E.; Domning, E.; Heggins, D.; Huber, L.; Hurd, R.; Martz, H.; Roberson, P.; Wilhelmsen, K.

    1994-04-01

    Under the US Department of Energy's (DOE's) Office of Technology Development (OTD)-Robotic Technology Development Program (RTDP), the Waste Processing Operations (WPO) Program was initiated in FY92 to address the development of automated material handling and automated chemical and physical processing systems for mixed wastes. The Program's mission was to develop a strategy for the treatment of all DOE mixed, low-level, and transuranic wastes. As part of this mission, DOE's Mixed Waste Integrated Program (MWIP) was charged with the development of innovative waste treatment technologies to surmount shortcomings of existing baseline systems. Current technology advancements and applications results from cooperation of private industry, educational institutions, and several national laboratories operated for DOE. This summary document presents the LLNL Environmental Restoration and Waste Management (ER and WM) Automation and Robotics Section's contributions in support of DOE's FY93 WPO Program. This document further describes the technological developments that were integrated in the 1993 Mixed Waste Operations (MWO) Demonstration held at SRTC in November 1993

  1. An event-based model for contracts

    Directory of Open Access Journals (Sweden)

    Tiziana Cimoli

    2013-02-01

    Full Text Available We introduce a basic model for contracts. Our model extends event structures with a new relation, which faithfully captures the circular dependencies among contract clauses. We establish whether an agreement exists which respects all the contracts at hand (i.e. all the dependencies can be resolved, and we detect the obligations of each participant. The main technical contribution is a correspondence between our model and a fragment of the contract logic PCL. More precisely, we show that the reachable events are exactly those which correspond to provable atoms in the logic. Despite of this strong correspondence, our model improves previous work on PCL by exhibiting a finer-grained notion of culpability, which takes into account the legitimate orderings of events.

  2. Production of High Harmonic X-ray Radiation from Non-linear Thomson Scattering at LLNL PLEIADES

    International Nuclear Information System (INIS)

    Lim, J; Doyuran, A; Frigola, P; Travish, G; Rosenzweig, J; Anderson, S; Betts, S; Crane, J; Gibson, D; Hartemann, F; Tremaine, A

    2005-01-01

    We describe an experiment for production of high harmonic x-ray radiation from Thomson backscattering of an ultra-short high power density laser by a relativistic electron beam at the PLEIADES facility at LLNL. In this scenario, electrons execute a ''figure-8'' motion under the influence of the high-intensity laser field, where the constant characterizing the field strength is expected to exceed unity: a L = eE L /m e cw L (ge) 1. With large a L this motion produces high harmonic x-ray radiation and significant broadening of the spectral peaks. This paper is intended to give a layout of the PLEIADES experiment, along with progress towards experimental goals

  3. 48 CFR 16.306 - Cost-plus-fixed-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-plus-fixed-fee...-fee contracts. (a) Description. A cost-plus-fixed-fee contract is a cost-reimbursement contract that.... The fixed fee does not vary with actual cost, but may be adjusted as a result of changes in the work...

  4. Social contract and social integration in adolescent development.

    Science.gov (United States)

    Hilles, W S; Kahle, L R

    1985-10-01

    Eighty-nine subjects from two high schools were tested during the spring of their sophomore and senior years, when their mean ages were 16 years, 1 month, and 18 years, 1 month, respectively. Composites measured social contract with: (a) independence, (b) implicit social contract, societal norms and expectations, and (c) explicit social contracts, rules. Composites and single items measured social integration with: (d) role commitment, (e) social-American Dream, accepting the belief in the American Dream that hard work would lead to social success, (f) self-American Dream, belief that hard work will produce personal satisfaction and success, (g) raw deal, perceptions of being treated unfairly, (h) self-blame, and (i) feelings of hopelessness. The results of the cross-lagged panel correlations generally support the hypothesis that students respond to implicit social contracts through role commitment, which is further expressed by a belief in the American Dream for social fulfillment, while responding to the perception of explicit social contracts by not believing in the benefits of the American Dream for personal fulfillment. These results were interpreted as supporting Dienstbier's theory of moral development.

  5. Contract Req Detailed Design Report Version 1: A C-BASS Component Contract Req Detailed Design Report Version 1: A C-BASS Component

    National Research Council Canada - National Science Library

    McGurin, Denis

    1999-01-01

    .... As part of the Corporate Business Application Software System (C-BASS) suite of work flow applications, Contract Req automates preparation of a requestor's procurement package as part of the contracting process for the U.S...

  6. Variations in government contract in Malaysia

    Directory of Open Access Journals (Sweden)

    Jaspal Singh Nachatar

    2010-12-01

    Full Text Available The complexity of construction works means that it is hardly possible to complete a project without changes to the plans or the construction process itself. There can only be a minority of contracts of any size in which the subject matter when completed is identical in every respect with what was contemplated at the outset. As such, variations are inevitable in even the best-planned contracts. This study is attempted to examine the ways a variation was formed in law and project, in finding out whether the Standard Form of Contract used in Malaysia particularly the government Public Works Department (PWD form has been utilized to the best level in variation cases. Additionally, this study examined the benefits of variations to parties in contract and also provides suggestions and assumptions in an effort to contribute solutions to issues and problem detected. The research methodology used in this study was an extensive review of relevant literature, case study, empirical questionnaires and structured interviews and general observations based on experience and surroundings. The academic study approach incorporated stages such as initial understanding, data and information gathering, analysis of data, findings and conclusion and general suggestions in the study. The major findings of this study, among others, revealed that the existences of variations are common in projects. The main cause of variations was due to client request because of inadequate project objectives for the designer to develop comprehensive design. Besides, the analysis pointed out that the government form of contract the Public Works Department (PWD 203/203A can help in overcoming projects with variation because of the clear defined procedure. This study also found that proper planning and coordination at tender stage can minimize the risk of ‘unwanted’ variations. In conclusion, this study recommended that future research should be done in design and build based contract

  7. Implementing a Rule-Based Contract Compliance Checker

    Science.gov (United States)

    Strano, Massimo; Molina-Jimenez, Carlos; Shrivastava, Santosh

    The paper describes the design and implementation of an independent, third party contract monitoring service called Contract Compliance Checker (CCC). The CCC is provided with the specification of the contract in force, and is capable of observing and logging the relevant business-to-business (B2B) interaction events, in order to determine whether the actions of the business partners are consistent with the contract. A contract specification language called EROP (for Events, Rights, Obligations and Prohibitions) for the CCC has been developed based on business rules, that provides constructs to specify what rights, obligation and prohibitions become active and inactive after the occurrence of events related to the execution of business operations. The system has been designed to work with B2B industry standards such as ebXML and RosettaNet.

  8. Army Contracting Command Workforce Model Analysis

    Science.gov (United States)

    2012-02-09

    Empresas in Madrid. His Air Force contracting experience includes F-22 Fighter, C-17 Cargo Transport , and a contingency deployment as director of Joint...and the University of Maryland (University College). He has also conducted visiting seminars at American University in Cairo and Instituto de ...the long total process times that are sometimes involved in weapon system contracting, such an assessment may equate to a de facto future work

  9. Choreographies and Behavioural Contracts on the Way to Dynamic Updates

    Directory of Open Access Journals (Sweden)

    Mario Bravetti

    2014-11-01

    Full Text Available We survey our work on choreographies and behavioural contracts in multiparty interactions. In particular theories of behavioural contracts are presented which enable reasoning about correct service composition (contract compliance and service substitutability (contract refinement preorder under different assumptions concerning service communication: synchronous address or name based communication with patient non-preemptable or impatient invocations, or asynchronous communication. Correspondingly relations between behavioural contracts and choreographic descriptions are considered, where a contract for each communicating party is, e.g., derived by projection. The considered relations are induced as the maximal preoders which preserve contract compliance and global traces: we show maximality to hold (permitting services to be discovered/substituted independently for each party when contract refinement preorders with all the above asymmetric communication means are considered and, instead, not to hold if the standard symmetric CCS/pi-calculus communication is considered (or when directly relating choreographies to behavioral contracts via a preorder, no matter the communication mean. The obtained maximal preorders are then characterized in terms of a new form of testing, called compliance testing, where not only tests must succeed but also the system under test (thus relating to controllability theory, and compared with classical preorders such as may/must testing, trace inclusion, etc. Finally, recent work about adaptable choreographies and behavioural contracts is presented, where the theory above is extended to update mechanisms allowing choreographies/contracts to be modified at run-time by internal (self-adaptation or external intervention.

  10. Psychological contracts of hospice nurses.

    Science.gov (United States)

    Jones, Audrey Elizabeth; Sambrook, Sally

    2010-12-01

    Psychological contracts have been described as individuals' beliefs regarding the obligations, expectations, and contributions that exist between them and their employer. They can be influenced by the organization's culture and philosophy, through human resources policies, and through the employee's personality and characteristics. Owing to the recent economic crisis, hospices in the UK are currently in a transitional phase and are being expected to demonstrate efficiencies that might be more in line with a business model than a health-care environment. This may conflict with the philosophical views of hospice nurses. To support nurses through this transition, it might be helpful to understand the antecedents of hospice nurses' behaviour and how they construct their psychological contracts. Failure to offer adequate support might lead to negative outcomes such as a desire to leave the organisation, poorer quality work, or disruptive behaviour. This study used a modified grounded theory approach involving in-depth interviews to explore the context and content of the psychological contracts of hospice nurses in the UK. Four main themes emerged: the types of psychological contracts formed, how the contracts are formed, their contents, and the breaches and potential violations the nurses perceive.

  11. Proposal for the award of an industrial support contract for the maintenance of and work on tertiary buildings at CERN, and operation of their installations

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for maintenance of and work on tertiary (i.e. non-accelerator) buildings and operation of their installations. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (CH) â?" G.T.M. (FR), the lowest bidder complying with the specification, for the provision of the maintenance of and work on tertiary buildings at CERN, and operation of their installations, for three years for a total amount not exceeding 9 346 650 euros (14 379 454 Swiss francs), not subject to revision until 1st January 2009, with options for additional services for an amount not exceeding 457 600 euros (704 000 Swiss francs), not subject to revision until 1st January 2009, bringing the total to an amount not exceeding 9 804 250 euros (15 083 454 Swiss francs), not subject to revision until 1st January 2009. The contract will include options for two one-year extensions beyond the initial three-year period.

  12. Career Stage and Generational Differences in Psychological Contracts

    Science.gov (United States)

    Hess, Narelle; Jepsen, Denise M.

    2009-01-01

    Purpose: The purpose of this paper is to determine how employees in different generational groups (or cohorts) and different career stages perceive their psychological contracts. Design/methodology/approach: A survey of 345 working adults included psychological contract obligations, incentives and importance and the cognitive responses of job…

  13. B827 Chemical Synthhesis Project - Industrial Control System Integration - Statement of Work & Specification with Attachments 1-14

    Energy Technology Data Exchange (ETDEWEB)

    Wade, F. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-04-21

    The Chemical Synthesis Pilot Process at the Lawrence Livermore National Laboratory (LLNL) Site 300 827 Complex will be used to synthesize small quantities of material to support research and development. The project will modernize and increase current capabilities for chemical synthesis at LLNL. The primary objective of this project is the conversion of a non-automated hands-on process to a remoteoperation process, while providing enhanced batch process step control, stored recipe-specific parameter sets, process variable visibility, monitoring, alarm and warning handling, and comprehensive batch record data logging. This Statement of Work and Specification provides the industrial-grade process control requirements for the chemical synthesis batching control system, hereafter referred to as the “Control System” to be delivered by the System Integrator.

  14. Defense Contracting: Use of Undefinitized Contract Actions Understand and Definitization Time Frames Often Not Met

    National Research Council Canada - National Science Library

    2007-01-01

    ...), which authorize contractors to begin work before reaching a final agreement on contract terms. The contractor has little incentive to control costs during this period, creating a potential for wasted taxpayer dollars...

  15. Line Emission and X-ray Line Polarization of Multiply Ionized Mo Ions

    Science.gov (United States)

    Petkov, E. E.; Safronova, A. S.; Kantsyrev, V. L.; Shlyaptseva, V. V.; Stafford, A.; Safronova, U. I.; Shrestha, I. K.; Schultz, K. A.; Childers, R.; Cooper, M. C.; Beiersdorfer, P.; Hell, N.; Brown, G. V.

    2016-10-01

    We present a comprehensive experimental and theoretical study of the line emission from multiply ionized Mo ions produced by two different sets of experiments: at LLNL EBIT and the pulsed power generator Zebra at UNR. Mo line emission and polarization measurements were accomplished at EBIT for the first time. In particular, benchmarking experiments at the LLNL EBIT with Mo ions produced at electron beam energies from 2.75 keV up to 15 keV allowed us to break down these very complicated spectra into spectra with only few ionization stages and to select processes that influence them as well as to measure line polarization. The EBIT data were recorded using the EBIT Calorimeter Spectrometer and a crystal spectrometer with a Ge crystal. X-ray Mo spectra and pinhole images were collected from Z-pinch plasmas produced from various wire loads. Non-LTE modeling, high-precision relativistic atomic and polarization data were used to analyze L-shell Mo spectra. The influence of different plasma processes including electron beams on Mo line radiation is summarized. This work was supported by NNSA under DOE Grant DE-NA0002954. Experiments at the NTF/UNR were funded in part by DE-NA0002075. Work at LLNL was performed under the auspices of the U.S. DOE under contract DE-AC52-07NA27344.

  16. Proposal for the award of an industrial services contract for electrical installation work and maintenance of lighting and low-voltage distribution

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for electrical installation work and maintenance of lighting and low-voltage distribution. Following a market survey carried out among 127 firms in fifteen Member States, a call for tenders (IT-2754/ST) was sent on 2 June 2000 to three firms and four consortia, each consisting of two firms, in four Member States. By the closing date, CERN had received tenders from two firms and two consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE TRINDEL(FR) ? CONTROLMATIC (DE), the lowest bidder complying with the specified requirements, for an initial period of three years from 1 July 2001 for a total amount of 41 705 497 Swiss francs, not subject to revision until 31 December 2003. The contract will include options for two one-year extensions beyond the initial three-year period for a total amount of 27 803 664 Swiss francs, for which CERN will seek approval by the Finance ...

  17. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  18. Contraction theory based adaptive synchronization of chaotic systems

    International Nuclear Information System (INIS)

    Sharma, B.B.; Kar, I.N.

    2009-01-01

    Contraction theory based stability analysis exploits the incremental behavior of trajectories of a system with respect to each other. Application of contraction theory provides an alternative way for stability analysis of nonlinear systems. This paper considers the design of a control law for synchronization of certain class of chaotic systems based on backstepping technique. The controller is selected so as to make the error dynamics between the two systems contracting. Synchronization problem with and without uncertainty in system parameters is discussed and necessary stability proofs are worked out using contraction theory. Suitable adaptation laws for unknown parameters are proposed based on the contraction principle. The numerical simulations verify the synchronization of the chaotic systems. Also parameter estimates converge to their true values with the proposed adaptation laws.

  19. 42 CFR 51.21 - Contracts for program operations.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Contracts for program operations. 51.21 Section 51... APPLICABLE TO THE PROTECTION AND ADVOCACY FOR INDIVIDUALS WITH MENTAL ILLNESS PROGRAM Program Administration and Priorities § 51.21 Contracts for program operations. (a) An eligible P&A system should work...

  20. An Optional Instrument for European Insurance Contract Law

    OpenAIRE

    Mandeep Lakhan; Helmut Heiss

    2010-01-01

    The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law) network, drafting a specific part of the Common Fr...

  1. Russia-U.S. joint program on the safe management of nuclear materials

    International Nuclear Information System (INIS)

    Witmer, F.E.; Krumpe, P.F.; Carlson, D.D.

    1998-06-01

    The Russia-US joint program on the safe management of nuclear materials was initiated to address common technical issues confronting the US and Russia in the management of excess weapons grade nuclear materials. The program was initiated after the 1993 Tomsk-7 accident. This paper provides an update on program activities since 1996. The Fourth US Russia Nuclear Materials Safety Management Workshop was conducted in March 1997. In addition, a number of contracts with Russian Institutes have been placed by Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories (SNL). These contracts support research related to the safe disposition of excess plutonium (Pu) and highly enriched uranium (HEU). Topics investigated by Russian scientists under contracts with SNL and LLNL include accident consequence studies, the safety of anion exchange processes, underground isolation of nuclear materials, and the development of materials for the immobilization of excess weapons Pu

  2. The Labour Contract as a Basis of Appearance of Labour Relations

    OpenAIRE

    Вишновецька, Світлана Василівна; Національний авіаційний університет; Такаджі, Людмила Геннадіївна; Національний авіаційний університет

    2016-01-01

    The article is devoted to research of labour contract as a basis of appearance of labour relations. The problems of conclusion of labour contract, its entry into force, the time of appearance of the labour relationship are very topical. The labour contract is the main form of realization of the right to work, a basis of appearance of labour relations that makes legal base for their functioning. Before December 28th, 2014 the actual admission to work was a basis of appearance of labour relatio...

  3. Contract-oriented software development for internet services

    DEFF Research Database (Denmark)

    Giambiagi, Pablo; Owe, Olaf; Ravn, Anders Peter

    2008-01-01

    COSoDIS (Contract-Oriented Software Development for Internet Services) develops novel approaches to implement and reason about contracts in service oriented architectures (SOA). The rationale is that system developers benefit from abstraction mechanisms to work with these architectures. Therefore...... the goal is to design and test system modeling and programming language tools to empower SOA developers to deploy highly dynamic, negotiable and monitorable Internet services....

  4. Final Report for Contract No. MDA903-85-C-0472

    National Research Council Canada - National Science Library

    Lewman, T

    2002-01-01

    .... Work was performed on site at ARI Presidio of Monterey (ARI-POM). This document, the final report for the contract, describes the results achieved during the contract, and provides a list of the products delivered...

  5. 23 CFR 635.121 - Contract time and contract time extensions.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  6. The Importance of Employment Contract for Umsida Quality Employees Improvement

    Directory of Open Access Journals (Sweden)

    Noor Fatimah Mediawati

    2015-12-01

    Full Text Available The absence of employment contracts in UMSIDA recognized cause some problems. Especially in improving the performance of employees. Issues a little more disturbing harmonious labor relations between employees and UMSIDA. In the terminology of the Labour Act, employment contract terms it is known as the Employment Agreement. Where the existence of labor agreement / contract employment is expected to harmonize the working relationship with the employer in accordance with the applicable rules. The existence of employment contracts is also a legal instrument which according to researchers ought to be put forward in efforts to increase the qualifications and competence of employees. By contract it will also avoid things that are not desirable in an employment relationship, because each party will always carry out their rights and responsibilities are aligned and balanced. Tranquility in the work and the guarantee of legal protection are expected to improve employee performance especially towards quality UMSIDA 2020. So this study explored further the urgency employment contract once its design. How To Cite: Mediawati, N., & Phahlevy, R. (2015. The Importance of Employment Contract for Umsida Quality Employees Improvement. Rechtsidee, 2(2, 141-156. doi:http://dx.doi.org/10.21070/jihr.v2i2.106

  7. Foxconned Labour as the Dark Side of the Information Age: Working Conditions at Apple’s Contract Manufacturers in China.

    Directory of Open Access Journals (Sweden)

    Marisol Sandoval

    2013-07-01

    Full Text Available Apple is one of the most dominant and most admired computer companies in the world. But hidden behind the clean surface of Apple’s advanced gadgets lies a dirty world of work. This paper focuses on the dark side of the information age by looking at working conditions in the workshops of Apple’s contract manufacturers in China. For this purpose I suggest a systematic model of working conditions that can be used for assessing and comparing work in different industries. Departing from Karl Marx’s circuit of capital it identifies elements that shape working conditions throughout the capital accumulation process including productive forces, relations of production, the production process, products, and labour legislation. Subsequently I apply this model to the realm of electronics manufacturing. Based on research conducted by corporate watchdogs this paper provides detailed insights into the work and life reality of workers in Apple’s first tier supplier factories. An analysis of Apple’s response to labour rights allegations furthermore reveals three ideological patterns that rather obscure existing problems than offering viable solutions.

  8. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE.../build type contract, section 4, “Conflict of Interest,” may need revision. (l) Construction contract... materially affect the ability to attain program objectives or prevent the meeting of project work units by...

  9. Evaluation of dynamic range for LLNL streak cameras using high contrast pulsed and pulse podiatry on the Nova laser system

    International Nuclear Information System (INIS)

    Richards, J.B.; Weiland, T.L.; Prior, J.A.

    1990-01-01

    This paper reports on a standard LLNL streak camera that has been used to analyze high contrast pulses on the Nova laser facility. These pulses have a plateau at their leading edge (foot) with an amplitude which is approximately 1% of the maximum pulse height. Relying on other features of the pulses and on signal multiplexing, we were able to determine how accurately the foot amplitude was being represented by the camera. Results indicate that the useful single channel dynamic range of the instrument approaches 100:1

  10. First experimental results from IBM/TENN/TULANE/LLNL/LBL undulator beamline at the advanced light source

    International Nuclear Information System (INIS)

    Jia, J.J.; Callcott, T.A.; Yurkas, J.; Ellis, A.W.; Himpsel, F.J.; Samant, M.G.; Stoehr, J.; Ederer, D.L.; Carlisle, J.A.; Hudson, E.A.; Terminello, L.J.; Shuh, D.K.; Perera, R.C.C.

    1995-01-01

    The IBM/TENN/TULANE/LLNL/LBL Beamline 8.0 at the advanced light source combining a 5.0 cm, 89 period undulator with a high-throughput, high-resolution spherical grating monochromator, provides a powerful excitation source over a spectral range of 70--1200 eV for surface physics and material science research. The beamline progress and the first experimental results obtained with a fluorescence end station on graphite and titanium oxides are presented here. The dispersive features in K emission spectra of graphite excited near threshold, and found a clear relationship between them and graphite band structure are observed. The monochromator is operated at a resolving power of roughly 2000, while the spectrometer has a resolving power of 400 for these fluorescence experiments

  11. Lack of symmetry in employees' perceptions of the psychological contract.

    Science.gov (United States)

    Jepsen, Denise M; Rodwell, John J

    2012-06-01

    Despite debate on the nature of employees' perceptions of their psychological contract, little research has compared employees' and employers' sides of the psychological contract. All 80 items from both scales in the Psychological Contract Inventory were used in a survey of 436 currently working, non-student respondents. Structural equation modeling yielded nonsymmetrical perspectives on promises and obligations, highlighting the validity of approaching the issues via individual perceptions.

  12. Comment: Risk Allocation Norms of Civil Construction Contracts in ...

    African Journals Online (AJOL)

    This comment discusses risk allocation under Ethiopian construction law and examines risks in civil construction contracts. The comment highlights the gaps in risk allocation norms under the standard format of construction contract that was issued by the Ethiopian Ministry of Work and Urban Development (MoWUD) in 1994 ...

  13. 29 CFR 785.4 - Application to Walsh-Healey Public Contracts Act.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Application to Walsh-Healey Public Contracts Act. 785.4... Considerations § 785.4 Application to Walsh-Healey Public Contracts Act. The principles set forth in this part... employees performing work subject to the provisions of the Walsh-Healey Public Contracts Act. [35 FR 15289...

  14. San Diego perspective on UST clean-ups

    International Nuclear Information System (INIS)

    Anderson, J.P.

    1996-01-01

    In June 1994, CalEPA State Water Resources Control Board (State Board) contracted with the Lawrence Livermore National Laboratory/University of California (LLNL/UC) to review the current UST regulatory framework and cleanup process. As a result of their review, LLNL/UC recommended changes to expedite the cleanup process at leaking UST sites. The LLNL/UC report concludes that natural attenuation of petroleum is an important factor in stabilizing plumes and may be the only remedial activity necessary in the absence of the source. After a review of existing literature and a study of selected leaking UST cases primarily from Coastal Range sedimentary or valley alluvium hydrogeochemical provinces, the LLNL/UC report found that petroleum plumes tend to stabilize close to the source, generally occur in shallow groundwater, and rarely impact drinking water wells in the state. The study and report recommendations focused solely on fuel petroleum hydrocarbon constituents

  15. Modeling and measurements of XRD spectra of extended solids under high pressure

    Science.gov (United States)

    Batyrev, I. G.; Coleman, S. P.; Stavrou, E.; Zaug, J. M.; Ciezak-Jenkins, J. A.

    2017-06-01

    We present results of evolutionary simulations based on density functional calculations of various extended solids: N-Si and N-H using variable and fixed concentration methods of USPEX. Predicted from the evolutionary simulations structures were analyzed in terms of thermo-dynamical stability and agreement with experimental X-ray diffraction spectra. Stability of the predicted system was estimated from convex-hull plots. X-ray diffraction spectra were calculated using a virtual diffraction algorithm which computes kinematic diffraction intensity in three-dimensional reciprocal space before being reduced to a two-theta line profile. Calculations of thousands of XRD spectra were used to search for a structure of extended solids at certain pressures with best fits to experimental data according to experimental XRD peak position, peak intensity and theoretically calculated enthalpy. Comparison of Raman and IR spectra calculated for best fitted structures with available experimental data shows reasonable agreement for certain vibration modes. Part of this work was performed by LLNL, Contract DE-AC52-07NA27344. We thank the Joint DoD / DOE Munitions Technology Development Program, the HE C-II research program at LLNL and Advanced Light Source, supported by BES DOE, Contract No. DE-AC02-05CH112.

  16. Forestry contracting in South Africa

    CSIR Research Space (South Africa)

    Khosa, M

    2000-01-01

    Full Text Available of their workers directly to a contractor system. For example, forest contractors are now hired to carry out planting, tending and silvicultural operations. Sappi Forests, Mondi Forests and Safcol are all contracting certain work out and are currently assisting...

  17. Psychological contracts: a new strategy for retaining reduced-hour physicians.

    Science.gov (United States)

    Hartwell, Jennifer K

    2010-01-01

    As a retention strategy, healthcare organizations offer reduced-hour schedules to physicians seeking better work-family balance. However, this quantitative study of 94 full-time and reduced-hour female physicians in the Boston area found that working fewer hours helps physicians achieve better balance but does not improve their burnout or career satisfaction, or impact their intention to quit or leave the field of medicine. Instead, the findings demonstrate that psychological contract fulfillment, which reflects the subjective nature of the employment relationship, is more important than work hours, an objective job condition, in predicting intention to quit and these other outcomes. A fine-grained analysis is initiated uncovering the multidimensionality of the psychological contract construct. To integrate successful reduced-hour arrangements for physicians, medical managers are directed to the importance of understanding the composition of reduced-hour physicians' psychological contracts, specifically, their need to do challenging work, receive high levels of supervisor support, and promotion opportunities.

  18. Customer Attraction in a Design-Build-Finance-Maintain-Operate Contract

    NARCIS (Netherlands)

    Favie, R.; Nordennen, van A.; Kleine, A.J.; Maas, G.J.; Ceric, A.; Radujkovic, M.

    2009-01-01

    In the Netherlands, large public customers use integrated contracts more and more often for complicated civil engineering and architectural works. Projects with integrated contracts such as Design, Build, Finance, Maintenance and Operate require tenderers to behave differently than they are

  19. On the Techniques and Tools for Privacy-Preserving Smart Contracts

    Directory of Open Access Journals (Sweden)

    Anastasia A. Barinova

    2017-06-01

    Full Text Available Currently, business processes become more and more complicated. Data used in these processes circulates mainly through the digital communications. Due to these conditions some kind of electronic contracts for business deals becomes necessary. Smart contracts should describe a set of conditions, implemented through some events in the real world and digital systems. The most important requirement for this technology is privacy ensuring. In this work we have explored existing projects of privacy-preserving smart contracts, defined comparison criteria, compared projects and made a conclusion about options required for smart contract frameworks.

  20. Standard form contracts and a smart contract future

    Directory of Open Access Journals (Sweden)

    Kristin B. Cornelius

    2018-05-01

    Full Text Available With a budding market of widespread smart contract implementation on the horizon, there is much conversation about how to regulate this new technology. Discourse on standard form contracts (SFCs and how they have been adopted in a digital environment is useful toward predicting how smart contracts might be interpreted. This essay provides a critical review of the discourse surrounding digitised SFCs and applies it to issues in smart contract regulation. An exploration of the literature surrounding specific instances SFCs finds that it lacks a close examination of the textual and documentary aspects of SFCs, which are particularly important in a digital environment as a shift in medium prompts a different procedural process. Instead, common perspectives are either based on outdated notions of paper versions of these contracts or on ideologies of industry and business that do not sufficiently address the needs of consumers/users in the digital age. Most importantly, noting the failure of contract law to address the inequities of SFCs in this environment can help prevent them from being codified further with smart contracts.

  1. A 'new' psychological contract for nurses: some management implications.

    Science.gov (United States)

    Cavanagh, S J

    1996-03-01

    Changes within the health services are raising a number of employment issues for nurses. The idea that a professional qualification and a job will lead to security of employment and career development is rapidly changing. These assumptions, the 'old' psychological contract, is giving way to new expectations from employers and employees; the emergence of a 'new' psychological contract. A psychological contract is an implicit agreement between employer and employee that each party will treat the other fairly. Such contracts are maintained by virtue of all parties wanting to seek agreement on issues where possible and to maintain trust. While such a contract is not a legally binding agreement it is nonetheless a binding understanding between people. Changes to this psychological contract can have important implications for individuals and their employer in terms of work and organizational commitment. This paper will discuss some of the issues surrounding psychological contracts and the impact of violating them. It will also discuss, from a management perspective, how psychological contracts develop between employer and employee, and how to form a 'new' psychological contract based upon mutual benefit and shared values.

  2. Water and Muscle Contraction

    Directory of Open Access Journals (Sweden)

    Enrico Grazi

    2008-08-01

    Full Text Available The interaction between water and the protein of the contractile machinery as well as the tendency of these proteins to form geometrically ordered structures provide a link between water and muscle contraction. Protein osmotic pressure is strictly related to the chemical potential of the contractile proteins, to the stiffness of muscle structures and to the viscosity of the sliding of the thin over the thick filaments. Muscle power output and the steady rate of contraction are linked by modulating a single parameter, a viscosity coefficient. Muscle operation is characterized by working strokes of much shorter length and much quicker than in the classical model. As a consequence the force delivered and the stiffness attained by attached cross-bridges is much larger than usually believed.

  3. Organization and management of the LHC civil-engineering contracts

    CERN Document Server

    Watson, T

    1999-01-01

    Since July 1994, the CERN Civil Engineering group within the ST division has been preparing and engaging contracts related to the Large Hadron Collider (LHC) project. Several of these contracts have values in excess of 10 MCHF and will be executed over a number of years; as such they represent an important part of the infrastructure works required for the LHC. To date, in excess of two hundred and fifty companies have been consulted in relation to these contracts. Contracts or orders have been placed with over thirty companies or joint ventures of companies from nearly all the CERN Member States. This paper aims to show the inter-relationships between these contracts and how the Civil Engineering group is carrying out the management of these important LHC contracts. The organization of the group will be explained along with the roles of individual members within the group.

  4. HOMEWORKING CONTRACT AND TELEWORKING - IMPORTANCE AND ROLE IN THE ECONOMY

    Directory of Open Access Journals (Sweden)

    OANA-CARMEN RĂVAŞ

    2013-12-01

    Full Text Available Work at home leads to greater stability of the community, because changing jobs often lead to a change of life and inherent stress. Employers who choose to work at home do not have the problem of providing housing for service or cost they incurred directly or indirectly or through the gaining that lucrative acquire more space in the office or in premises whose owner is or the fact that there office rents. The individual contract of working at home is an individual employment contract named special character, with the main feature that "work place" is not located in the unit, the employer, but the employee's residence.

  5. Author Contribution to the Pu Handbook II: Chapter 37 LLNL Integrated Sample Preparation Glovebox (TEM) Section

    Energy Technology Data Exchange (ETDEWEB)

    Wall, Mark A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-10-25

    The development of our Integrated Actinide Sample Preparation Laboratory (IASPL) commenced in 1998 driven by the need to perform transmission electron microscopy studies on naturally aged plutonium and its alloys looking for the microstructural effects of the radiological decay process (1). Remodeling and construction of a laboratory within the Chemistry and Materials Science Directorate facilities at LLNL was required to turn a standard radiological laboratory into a Radiological Materials Area (RMA) and Radiological Buffer Area (RBA) containing type I, II and III workplaces. Two inert atmosphere dry-train glove boxes with antechambers and entry/exit fumehoods (Figure 1), having a baseline atmosphere of 1 ppm oxygen and 1 ppm water vapor, a utility fumehood and a portable, and a third double-walled enclosure have been installed and commissioned. These capabilities, along with highly trained technical staff, facilitate the safe operation of sample preparation processes and instrumentation, and sample handling while minimizing oxidation or corrosion of the plutonium. In addition, we are currently developing the capability to safely transfer small metallographically prepared samples to a mini-SEM for microstructural imaging and chemical analysis. The gloveboxes continue to be the most crucial element of the laboratory allowing nearly oxide-free sample preparation for a wide variety of LLNL-based characterization experiments, which includes transmission electron microscopy, electron energy loss spectroscopy, optical microscopy, electrical resistivity, ion implantation, X-ray diffraction and absorption, magnetometry, metrological surface measurements, high-pressure diamond anvil cell equation-of-state, phonon dispersion measurements, X-ray absorption and emission spectroscopy, and differential scanning calorimetry. The sample preparation and materials processing capabilities in the IASPL have also facilitated experimentation at world-class facilities such as the

  6. Author Contribution to the Pu Handbook II: Chapter 37 LLNL Integrated Sample Preparation Glovebox (TEM) Section

    International Nuclear Information System (INIS)

    Wall, Mark A.

    2016-01-01

    The development of our Integrated Actinide Sample Preparation Laboratory (IASPL) commenced in 1998 driven by the need to perform transmission electron microscopy studies on naturally aged plutonium and its alloys looking for the microstructural effects of the radiological decay process (1). Remodeling and construction of a laboratory within the Chemistry and Materials Science Directorate facilities at LLNL was required to turn a standard radiological laboratory into a Radiological Materials Area (RMA) and Radiological Buffer Area (RBA) containing type I, II and III workplaces. Two inert atmosphere dry-train glove boxes with antechambers and entry/exit fumehoods (Figure 1), having a baseline atmosphere of 1 ppm oxygen and 1 ppm water vapor, a utility fumehood and a portable, and a third double-walled enclosure have been installed and commissioned. These capabilities, along with highly trained technical staff, facilitate the safe operation of sample preparation processes and instrumentation, and sample handling while minimizing oxidation or corrosion of the plutonium. In addition, we are currently developing the capability to safely transfer small metallographically prepared samples to a mini-SEM for microstructural imaging and chemical analysis. The gloveboxes continue to be the most crucial element of the laboratory allowing nearly oxide-free sample preparation for a wide variety of LLNL-based characterization experiments, which includes transmission electron microscopy, electron energy loss spectroscopy, optical microscopy, electrical resistivity, ion implantation, X-ray diffraction and absorption, magnetometry, metrological surface measurements, high-pressure diamond anvil cell equation-of-state, phonon dispersion measurements, X-ray absorption and emission spectroscopy, and differential scanning calorimetry. The sample preparation and materials processing capabilities in the IASPL have also facilitated experimentation at world-class facilities such as the

  7. Pooling knowledge and improving safety for contracted works at a large industrial park.

    Science.gov (United States)

    Agnello, Patrizia; Ansaldi, Silvia; Bragatto, Paolo

    2015-01-01

    At a large chemical park maintenance is contracted by the major companies operating the plants to many small firms. The cultural and psychological isolation of contractor workers was recognized a root cause of severe accidents in the recent years. That problem is common in chemical industry. The knowledge sharing has been assumed a good key to involve contractors and sub contractors in safety culture and contributing to injuries prevention. The selection of personal protective equipment PPE for the maintenance works has been taken as benchmark to demonstrate the adequateness of the proposed approach. To support plant operators, contractors and subcontractors in PPE discussion, a method has been developed. Its core is a knowledge-base, organized in an Ontology, as suitable for inferring decisions. By means of this tool all stakeholders have merged experience and information and find out the right PPE, to be provided, with adequate training and information package. PPE selection requires sound competencies about process and environmental hazards, including major accident, preventive and protective measures, maintenance activities. These pieces of knowledge previously fragmented among plant operators and contractors, have to be pooled, and used to find out the adequate PPE for a number of maintenance works. The PPE selection is per se important, but it is also a good chance to break the contractors' isolation and involve them in safety objectives. Thus by pooling experience and practical knowledge, the common understanding of safety issues has been strengthened.

  8. Collective contract in thermal equipment mounting process at the Balakovo NPP

    International Nuclear Information System (INIS)

    Shpol, E.A.; Goryashchenko, Yu.N.

    1986-01-01

    Experience of collective contract introduction into thermal equipment mounting process at the Balakovo NPP is briefly described.4627 thousand roubles are utilized and 45.6% of annual volume of works are made using the collective contract method in 1984 during reactor room construction at the Balakovo-1 NPP. Cost of works are reduced by 137.8 thousand roubles. The conclusion is made that the formation of large teams ( 45-70 men ) promotes labour productivity increase as well as high quality of works

  9. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Helmut Heiss

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts.Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  10. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Mandeep Lakhan

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts. Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  11. Key Considerations for Using No-Harm Contracts with Clients Who Self-Injure

    Science.gov (United States)

    Hyldahl, Rebecca S.; Richardson, Brent

    2011-01-01

    One of the more controversial issues in working with people who self-injure is whether counselors should use no-harm contracts. Important therapeutic considerations include the efficacy of such contracts or agreements in preventing self-injury, the emotional and behavioral responses of clients, and the perceived protection these contracts or…

  12. Muscle involvement during intermittent contraction patterns with different target force feedback modes

    DEFF Research Database (Denmark)

    Sjøgaard, G; Jørgensen, L V; Ekner, D

    2000-01-01

    and following 30 min of intermittent contractions showed larger fatigue development with proprioceptive feedback than visual feedback. Also rating of perceived exertion increased more during proprioceptive feedback than visual feedback. This may in part be explained by small differences in the mechanics during......: Feedback mode significantly effects the muscle involvement and fatigue during intermittent contractions. RelevanceIntermittent contractions are common in many work places and various feedback modes are being given regarding work requirements. The choice of feedback may significantly affect the muscle load...... and consequently the development muscle fatigue and disorders....

  13. IAEA research contracts. Second annual report

    International Nuclear Information System (INIS)

    1962-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  14. IAEA research contracts. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1962-07-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  15. Engineering and Statistical Research Institute contract reports to May, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Thuns, A; Morrison, B A

    1983-06-01

    The purpose of this publication is to provide information on certain Canadian agricultural research contracts which are completed, published and available for loan. These contracts reports are documentation of research contracted out to non-federal government agencies, universities or individuals. Reports on contracts under the control of the Engineering and Statistical Research Institute are written by the contractor, and are reviewed by the scientific authority. Some reports date back to 1973, when the initial contracting program began. The first program was called DREAM (Development, Research, and Evaluation in Agricultural Mechanization). In 1977-78, projects under the Energy in Agriculture program were added. This was the beginning of the AERD (Agricultural Enginering Research and Development) program. In 1981, energy research had expanded and came under a separate progam called ERDAF (Energy Research and Development in Agriculture and Food). The remaining contract work stayed with the AERD program. This publication lists only contracts completed having final reports, and available contract reports with separate listings sorted by contract file number, title, author or subject.

  16. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  17. [Psychological contract in the light of flexible employment: The review of studies].

    Science.gov (United States)

    Żołnierczyk-Zreda, Dorota

    Changing employment relations between employees and employers due to the increasing employment flexibility have contributed to the development of a new paradigm to analyze these relations based on the concept of psychological contract. This paradigm might be particularly relevant in Poland where the employment flexibility understood as the number of workers with temporary contracts is the highest in Europe. In this paper the concept of psychological contract is presented along with the existing findings related to its range, balance and contract fulfilment vs. contract breach. The results of studies showing the differences in psychological contract of temporary and permanent workers are also presented. The majority of them indicate that psychological contracts of temporary workers are limited in their extent, less balanced and asymmetric (to workers' disadvantage), as well as more transactional in their nature than those of permanent workers. The temporary workers' well-being and attitudes towards work and their reaction to psychological contract breach largely depends on their preferences for this type of employment, on their qualifications and on a labor market situation. Med Pr 2016;67(4):529-536. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  18. Performance-based contracting for maintaining transportation assets with emphasis on bridges

    Directory of Open Access Journals (Sweden)

    Alsharqawi Mohammed

    2017-01-01

    Full Text Available With a large number of aging transportation infrastructure assets in North America and the growing problem of deterioration across the globe, managing these assets have been the subject of ongoing research. There is an overwhelming amount of maintenance and rehabilitation works to be done and selecting a suitable maintenance, repair or replacement (MRR strategy is one of the most challenging tasks for decision makers. Limited budget and resources are even making the decision making process more challenging. Maintaining infrastructure to the highest possible condition while investing the minimal amount of money has promoted innovative contracting approaches. Transportation agencies have increased private sector involvement through long term performance-based maintenance contracts or what is called Performance-Based Contracting. PBC is a type of contract that pays a contractor based on the results achieved, not on the methods for performing the maintenance work. By looking into the literature, it is observed that agencies are expanding the amount of contracting they do in order to maintain and achieve a better standard of infrastructure facilities. Therefore, the objective of this paper is to study and review performance-based contracting for transportation infrastructure with emphasis on bridge assets.

  19. To tender, re-negotiate or partner: Strategies for contracting service companies

    International Nuclear Information System (INIS)

    Gouldie, T.A.

    1994-01-01

    The contracting of oilfield service companies by petroleum exploration and production operating companies is different than the contracting of civil engineering, construction or other project-oriented contractors. The relationship between operating companies and oilfield service companies has had a long and unique history which has evolved since the first oil wells were drilled over a century ago. The process of contracting service companies by operating companies for petroleum exploration and production work can be split into three distinct stages: (1) decide what it is that should be contracted out and what should be kept in house; (2) determine the method to use to select the contractor(s) to perform the work; and (3) agree to the contractual structure to best reflect the relationship the operating company and the service company with to initiate and maintain. As there are ongoing changes to the business structures and corporate thinking of both operating and service companies, there are also evolving changes to what are considered core businesses and the methods of selecting and contracting service companies by operating companies. Operating companies are recognizing the high costs of tendering for contractor services in terms of personnel time and administrative effort, and are relying more on negotiating and rolling-over existing contracts with their suitable, capable contractors. Partnering, in its many forms and levels, is increasingly being recognized as a useful method to get better work done at cheaper overall costs

  20. Features of the Market Achievement Plan (MAPII) contracts

    International Nuclear Information System (INIS)

    Roberts, B.

    2002-01-01

    This PowerPoint presentation described the MAPII products and contract characteristics with reference to aggregator role, location and system development. Work underway by the Balancing Pool for Alberta's Electricity Consumers was highlighted. It was demonstrated that 'all-in' costs of PPAs exceed market prices. Charts depicting both unit and strip contract interfaces were included. It was noted that the sale of a strip contract requires an aggregator whose function will essentially replace the interface between power pool participants and the power pool. Strip contract buyers will interface with the aggregator. The aggregator will have no discretion in managing offers. The three options for aggregator location are for the aggregator to be part of the balancing pool, attached to the power pool, or as an independent agent. 2 figs

  1. IAEA research contracts. Third annual report

    International Nuclear Information System (INIS)

    1963-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  2. IAEA research contracts. Third annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-04-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  3. Analysis of Government Accountability Office and Department of Defense Inspector General Reports and Commercial Sources on Service Contracts

    Science.gov (United States)

    2010-06-01

    Acquisition Research Program BIM Building Information Modeling COR Contracting Officer Representative DoD Department of Defense FPDS...WBS), performance work statements (PWS) and statement of work (SOW), market research, budget and cost estimates, determining contract type, and...contracting within this project. The recurrent best practices in contracting among all sources emphasized planning, defining requirements, market research

  4. Impact of the Revised 10 CFR 835 on the Neutron Dose Rates at LLNL

    International Nuclear Information System (INIS)

    Radev, R.

    2009-01-01

    In June 2007, 10 CFR 835 (1) was revised to include new radiation weighting factors for neutrons, updated dosimetric models, and dose terms consistent with the newer ICRP recommendations. A significant aspect of the revised 10 CFR 835 is the adoption of the recommendations outlined in ICRP-60 (2). The recommended new quantities demand a review of much of the basic data used in protection against exposure to sources of ionizing radiation. The International Commission on Radiation Units and Measurements has defined a number of quantities for use in personnel and area monitoring (3,4,5) including the ambient dose equivalent H*(d) to be used for area monitoring and instrument calibrations. These quantities are used in ICRP-60 and ICRP-74. This report deals only with the changes in the ambient dose equivalent and ambient dose rate equivalent for neutrons as a result of the implementation of the revised 10 CFR 835. In the report, the terms neutron dose and neutron dose rate will be used for convenience for ambient neutron dose and ambient neutron dose rate unless otherwise stated. This report provides a qualitative and quantitative estimate of how much the neutron dose rates at LLNL will change with the implementation of the revised 10 CFR 835. Neutron spectra and dose rates from selected locations at the LLNL were measured with a high resolution spectroscopic neutron dose rate system (ROSPEC) as well as with a standard neutron rem meter (a.k.a., a remball). The spectra obtained at these locations compare well with the spectra from the Radiation Calibration Laboratory's (RCL) bare californium source that is currently used to calibrate neutron dose rate instruments. The measurements obtained from the high resolution neutron spectrometer and dose meter ROSPEC and the NRD dose meter compare within the range of ±25%. When the new radiation weighting factors are adopted with the implementation of the revised 10 CFR 835, the measured dose rates will increase by up to 22%. The

  5. The psychological contracts of National Health Service nurses.

    Science.gov (United States)

    Purvis, Lynne J; Cropley, Mark

    2003-03-01

    Following the psychological contract model of the employee-employer exchange relationship is offered as a means of understanding the expectations of a UK sample of 223 National Health Service (NHS) nurses in association with their leaving intentions. A pilot study involving 21 NHS nurses, using the repertory grid technique was conducted to elicit contract expectations. Twenty-nine categories of expectation were identified through content analysis. The study proper, employed a survey developed on the basis of results from the pilot study to identify contract profiles among 223 nurses from three London/South-east NHS hospitals, using the Q-sort method. Type of contract held (relational/transactional), satisfaction (job and organization), and leaving intentions were also examined. Q-analysis yielded four contract profiles among the nurses sampled: 'self-development and achievement'; 'belonging and development'; 'competence and collegiality' and 'autonomy and development'. Correlation analysis demonstrated that leaving intentions were associated with a need for personal autonomy and development, and the violation of expectations for being appreciated, valued, recognized and rewarded for effort, loyalty, hard-work and achievement, negative endorsement of a relational contract, positive endorsement of a transactional contract, and job and organizational dissatisfaction. Findings illustrate the diagnostic utility of the term psychological contract for understanding the expectations of NHS nurses. The potential significance of these findings for managing nurse retention is highlighted.

  6. Is contracting out good or bad for employees?

    DEFF Research Database (Denmark)

    Vrangbæk, Karsten; Petersen, Ole Helby; Hjelmar, Ulf

    2015-01-01

    in the working conditions and work environment for the personnel in public organizations. In this article, we present the findings from a systematic review of studies documenting the consequences of contracting out for employees. The review is based on 26 empirical studies published between 2000 and 2012. We...... find both positive and negative effects for employees documented in the literature, although with a predominance of negative effects, including reductions in the workforce and other changes in the workforce composition such as the replacement of experienced employees with younger workers, poorer...... working conditions, lower salaries, fewer benefits, and reduced job satisfaction. We conclude that poorer conditions for the public service personnel are well documented as a short-term consequence of contracting out, while more studies covering a longer time-span are needed to assess whether...

  7. Considerations Relating to the Jurisdiction of the Arbitration Litigation on Solving Public Acquisition Contracts

    Directory of Open Access Journals (Sweden)

    Gina Livioara Goga

    2016-05-01

    Full Text Available The current legislation on public procurement, namely Government Emergency Ordinance no. 34/2006 on the public procurement contracts, public works concession contracts and service concession, currently governs the arbitration institution, having the possibility of settling any disputes regarding the execution of contracts. We consider that the contested provisions infringe the principle of predictability, as they are not clear because of the regulation of the two articles, and thus the analysis of the entire chapter entitled “Solving complaints” (Chapter IX of the G.E.O. 34/2006 in conjunction with the title order or with the purpose and principles of the adoption of G.E.O. 34/2006, it appears that it refers only to the procedure for settling disputes arising in attributing public procurement contracts, concession contracts for public works service concession contracts.

  8. "I Can Only Work So Hard Before I Burn Out." A Time Sensitive Conceptual Integration of Ideological Psychological Contract Breach, Work Effort, and Burnout.

    Science.gov (United States)

    Jones, Samantha K; Griep, Yannick

    2018-01-01

    Employees often draw meaning from personal experiences and contributions in their work, particularly when engaging in organizational activities that align with their personal identity or values. However, recent empirical findings have demonstrated how meaningful work can also have a negative effect on employee's well-being as employees feel so invested in their work, they push themselves beyond their limits resulting in strain and susceptibility to burnout. We develop a framework to understand this "double edged" role of meaningful work by drawing from ideological psychological contracts (iPCs), which are characterized by employees and their employer who are working to contribute to a shared ideology or set of values. Limited iPC research has demonstrated employees may actually work harder in response to an iPC breach. In light of these counterintuitive findings, we propose the following conceptual model to theoretically connect our understanding of iPCs, perceptions of breach, increases in work effort, and the potential "dark side" of repeated occurrences of iPC breach. We argue that time plays a central role in the unfolding process of employees' reactions to iPC breach over time. Further, we propose how perceptions of iPC breach relate to strain and, eventually, burnout. This model contributes to our understanding of the role of time in iPC development and maintenance, expands our exploration of ideology in the PC literature, and provides a framework to understanding why certain occupations are more susceptible to instances of strain and burnout. This framework has the potential to guide future employment interventions in ideology-infused organizations to help mitigate negative employee outcomes.

  9. Contracts Take or Pay, for supply and transport of gas

    International Nuclear Information System (INIS)

    Velasquez Bermudez, Jesus Maria

    2000-01-01

    The present article has as objective to study the effect that has the contract of supply and of transport of gas that subscribe generators agents of the electric sector with the agents of the market of the gas. The article concentrates on the study of the denominated contracts take or pay. Initially the modeling is analyzed to include the effect of the contracts of gas in the mathematical models that are used to support the works of planning. Later on is studied of optimal form to determining the prices in spot markets of the industries associated to the contracts. Finally is presented the methodology and controlled experiments that allow to identify and to quantify the macro economic effect of the contracts

  10. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  11. Optimal design of uptime-guarantee contracts under IGFR valuations and convex costs

    OpenAIRE

    Hezarkhni, Behzad

    2016-01-01

    An uptime-guarantee contract commits a service provider to maintain the functionality of a customer’s equipment at least for certain fraction of working time during a contracted period. This paper addresses the optimal design of uptime-guarantee contracts for the service provider when the customer’s valuation of a contract with a given guaranteed uptime level has an Increasing Generalized Failure Rate (IGFR) distribution. We first consider the case where the service provider proposes only one...

  12. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Science.gov (United States)

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  13. Immigration, work and health in Spain: the influence of legal status and employment contract on reported health indicators.

    Science.gov (United States)

    Sousa, Emily; Agudelo-Suárez, Andrés; Benavides, Fernando G; Schenker, Marc; García, Ana M; Benach, Joan; Delclos, Carlos; López-Jacob, María José; Ruiz-Frutos, Carlos; Ronda-Pérez, Elena; Porthé, Victoria

    2010-10-01

    To analyze the relationship of legal status and employment conditions with health indicators in foreign-born and Spanish-born workers in Spain. Cross-sectional study of 1,849 foreign-born and 509 Spanish-born workers (2008-2009, ITSAL Project). Considered employment conditions: permanent, temporary and no contract (foreign-born and Spanish-born); considered legal statuses: documented and undocumented (foreign-born). Joint relationships with self-rated health (SRH) and mental health (MH) were analyzed via logistical regression. When compared with male permanently contracted Spanish-born workers, worse health is seen in undocumented foreign-born, time in Spain ≤3 years (SRH aOR 2.68, 95% CI 1.09-6.56; MH aOR 2.26, 95% CI 1.15-4.42); in Spanish-born, temporary contracts (SRH aOR 2.40, 95% CI 1.04-5.53); and in foreign-born, temporary contracts, time in Spain >3 years (MH: aOR 1.96, 95% CI 1.13-3.38). In females, highest self-rated health risks are in foreign-born, temporary contracts (aOR 2.36, 95% CI 1.13-4.91) and without contracts, time in Spain >3 years (aOR 4.63, 95% CI 1.95-10.97). Contract type is a health determinant in both foreign-born and Spanish-born workers. This study offers an uncommon exploration of undocumented migration and raises methodological issues to consider in future research.

  14. IPP fuel contracts - creating certain contracts for uncertain times

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, I. [Coddington International Pty. Ltd., Milsons Point, NSW (Australia)

    1998-12-31

    Coal contracts for the new Asian Independent Power Producers (IPPs) are examined. Since most IPPs will be selling to state electricity utilities, often in competition with power plant using other fuels, coal based IPPs must negotiate advantageous coal supply contracts several years before the commissioning of a plant, and must ensure security of supply for at least the life of the construction loan. A more recent trend in the developed world is the Merchant IPP, where there is no guaranteed electricity sale. Lenders are wary of IPPs relying an imported coal, and insist on binding fuel contracts, while coal companies are wary of the quantity of information demanded by these lenders. A full understanding of the risks involved is needed; and a method of price indexation for the contracts. Contracts must also specify security of supply, coal quality, freight contracts and other details. 2 figs.

  15. [Contract learning: effects of professionalization on the student nurse].

    Science.gov (United States)

    Jubin, Patricia

    2013-03-01

    The reengineering of nurse training implies the implementation of self-development, empowering tools and a reshaping of the function of accompaniment during training which becomes a shared function. This work is part of a psycho-socio-educational approach of the accompaniment to self-directed learning and also in the field of practices of health and social work. This study contributes to the identification of the conditions of efficiency of contracting between student nurses, tutors and instructors. It aims to explore the interest of a triangular steering of the learning contract centered on the student's individual project and also the interest of meetings during training as triggers to a process of self-construction of competences. Moreover, the study aims to identify the effects of contract on professionalization. Our study reverts to the basic question of learning by contract as a pillar for the self-directed learning in an alternating training context. The empirical approach takes into account a qualitative study carried out with 15 people (tutors, managers, student nurses and instructors) in 3 health care structures and a quantitative study based on 78 first year students, 106 second year students, and 47 third year students at the same nursing education institute. The study shows that learning by contract is empowering and professionalizing, if the student is placed in favorable conditions of learning and contractual relationship.

  16. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  17. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  18. Team contracts at the Gorlovskuglestroi organization

    Energy Technology Data Exchange (ETDEWEB)

    Vasil' ev, A.Z.

    1984-08-01

    Details are given of successes achieved in mine drivage under the team contract system at Artemugol' mines. Of 43 drivage teams, 15 are working with this system. In 1983 plan figures were generally exceeded. In one mine, the new system led to an increase from 48 to 73 m/month in average drivage rates. Production per man per shift rose from 1.04 to 1.5 m/sup 3/. These increases were partly due to use of a spiral cut for explosive fracturing, BU-1 drilling units and PPN-4 loaders. More efficient work organization led to the elimination of absenteeism and a decrease in consumption of materials and compressed air. Concrete forms were used 4-5 times instead of twice, and drill bits sharpened up to 5 times. Drawbacks to the system include cumbersome accounting procedures and the need for frequent amendments to contracts.

  19. Overview and applications of the Monte Carlo radiation transport kit at LLNL

    International Nuclear Information System (INIS)

    Sale, K. E.

    1999-01-01

    Modern Monte Carlo radiation transport codes can be applied to model most applications of radiation, from optical to TeV photons, from thermal neutrons to heavy ions. Simulations can include any desired level of detail in three-dimensional geometries using the right level of detail in the reaction physics. The technology areas to which we have applied these codes include medical applications, defense, safety and security programs, nuclear safeguards and industrial and research system design and control. The main reason such applications are interesting is that by using these tools substantial savings of time and effort (i.e. money) can be realized. In addition it is possible to separate out and investigate computationally effects which can not be isolated and studied in experiments. In model calculations, just as in real life, one must take care in order to get the correct answer to the right question. Advancing computing technology allows extensions of Monte Carlo applications in two directions. First, as computers become more powerful more problems can be accurately modeled. Second, as computing power becomes cheaper Monte Carlo methods become accessible more widely. An overview of the set of Monte Carlo radiation transport tools in use a LLNL will be presented along with a few examples of applications and future directions

  20. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  1. Quantitative application study on the control system of contract progress

    International Nuclear Information System (INIS)

    Hu Xiaocong; Kang Rujie; Zhan Li

    2012-01-01

    Quantitative application study on the control system of contract progress, which is based on project management theory and PDCA cycle methods, provides a new way for the contract business management of enterprise, in line with the current situation and the nuclear power enterprise performance management needs. The concept of the system, system development, program design and development of ERP (VBA design) which come from the work experience summary of business managers are convenient and feasible in practical applications. By way of the applications in 2009, 2010, 2011 three-year overhaul contract management and continuous adjustment it has become an important business management tool, which not only effectively guaranteed the contract time and efficiency, but also combines the performance management and contract progress management. This study has provided useful reference for the enterprise management. (authors)

  2. 23 CFR 635.120 - Changes and extra work.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.120 Changes and extra work. (a) Following authorization to proceed with a project, all major changes in the plans and contract provisions and all major extra... to what constitutes a non-major change and non-major extra work. (c) Changes in contract time, as...

  3. Contracting with the Enemy: The Contracting Officer’s Dilemma

    Science.gov (United States)

    2015-06-01

    contracting command xv KO contracting officer KTR contractor LSC lead service component MGAA Mesopotamia Group Atlas Apache NAT National Afghanistan...and Contract Authority Understanding the roles of contracting versus command authority and command relationships is a fundamental that must be...Audit 12-7 (2012) described the CENTCOM-JTSCC (C- JTSCC) formation and command relationship : In April 2010, CENTCOM issued a fragmentary order to

  4. Proposal for the Award of Three Contracts without competitive tendering or Design Calculations and Drawings for the Reinforced Concrete Work in LEP Surface Buildings and Supervision of their Implementation

    CERN Document Server

    1987-01-01

    Proposal for the Award of Three Contracts without competitive tendering or Design Calculations and Drawings for the Reinforced Concrete Work in LEP Surface Buildings and Supervision of their Implementation

  5. Cost savings from performance-based maintenance contracting

    NARCIS (Netherlands)

    Straub, A.

    2009-01-01

    New procurement approaches combined with performance-based building approaches should reduce costs, but empirical qualitative and quantitative studies are lacking. Performance-based maintenance contracts give maintenance suppliers incentives to improve their way of working. Innovative,

  6. Effectiveness of a return-to-work program for workers without an employment contract, sick-listed due to common mental disorders.

    Science.gov (United States)

    Lammerts, Lieke; Schaafsma, Frederieke G; Bonefaas-Groenewoud, Karin; van Mechelen, Willem; Anema, Johannes

    2016-06-01

    Both the presence of mental health problems and the absence of an employment contract have been related to long-term sickness absence and unemployment, indicating a need for return-to-work (RTW) interventions. Our aim was to study the effectiveness of a new participatory, supportive RTW program for workers without an employment contract, sick-listed 2-14 weeks due to a common mental disorder, in comparison with usual care. A participatory approach, integrated care and direct placement in a competitive job were part of the new program. The primary outcome measure was duration until first sustainable RTW in competitive employment. Cox regression analysis was applied to study this outcome. Secondary outcome measures were average working hours, duration until any type of employment, sickness benefit duration, and perceived health and functioning. In total, 186 participants were included in the study and randomly allocated to an intervention group (N=94), or control group (N= 92). A hazard ratio (HR) of 1.15 (95% CI 0.61-2.16) for duration until first sustainable RTW indicated no significant effect of allocation to the new program, compared to usual care. Furthermore, no significant differences were found in favor of the intervention group on any secondary outcome. Compared to usual care, the new program did not result in a significant shorter duration until first sustainable RTW. However, due to low protocol adherence, it remains unclear what the results would have been if the program had been executed according to protocol.

  7. Pleiades: A Sub-picosecond Tunable X-ray Source at the LLNL Electron Linac

    International Nuclear Information System (INIS)

    Slaughter, Dennis; Springer, Paul; Le Sage, Greg; Crane, John; Ditmire, Todd; Cowan, Tom; Anderson, Scott G.; Rosenzweig, James B.

    2002-01-01

    The use of ultra fast laser pulses to generate very high brightness, ultra short (fs to ps) pulses of x-rays is a topic of great interest to the x-ray user community. In principle, femto-second-scale pump-probe experiments can be used to temporally resolve structural dynamics of materials on the time scale of atomic motion. The development of sub-ps x-ray pulses will make possible a wide range of materials and plasma physics studies with unprecedented time resolution. A current project at LLNL will provide such a novel x-ray source based on Thomson scattering of high power, short laser pulses with a high peak brightness, relativistic electron bunch. The system is based on a 5 mm-mrad normalized emittance photo-injector, a 100 MeV electron RF linac, and a 300 mJ, 35 fs solid-state laser system. The Thomson x-ray source produces ultra fast pulses with x-ray energies capable of probing into high-Z metals, and a high flux per pulse enabling single shot experiments. The system will also operate at a high repetition rate (∼ 10 Hz). (authors)

  8. Long-term contracts for European gas supply - an empirical analysis of the changing nature of pipeline and LNG-contracts

    International Nuclear Information System (INIS)

    Neumann, Anne

    2005-01-01

    model of investment in infrastructure, where buyers and sellers have different valuations for flexibility and risk reflected in the structure of signed contracts. Our empirical test is based on a unique sample of long-term contracts investigating differences in pre-specified characteristics such as take-or-pay obligations (flexibility), contract duration or committed quantities delivered throughout the contracted time period of both LNG and pipeline contracts. Simultaneously, tribute to institutional differences in market design will be paid. The paper extends earlier work by the author on long-term contracts and supply security of natural gas in Europe (Neumann 2003, Neumann and Hirschhausen, 2004). (Author)

  9. Nuclear Power Plant Construction Contracts: A Review of the Major Problems

    International Nuclear Information System (INIS)

    Crawford, B.B.

    1977-01-01

    This paper analyses the problems raised by nuclear power plant construction contracts. To the extent these contracts can be defined as devices for allocating responsibilities and risks between the Contracting Parties, the author notes that the 'responsibilities' aspect presents no problem peculiar to the nuclear sector and that difficulties mainly stem from co-ordination of work. On the other hand, the list of problems linked to 'nuclear contract risks' is long: uncertainties in the licensing procedure and export licenses, changes in pricing due to inflation, imprevision and force majeure theories, protection of proprietary information, operator's civil liability for nuclear incidents. (NEA) [fr

  10. Why radiologists lose their hospital contracts: is your contract secure?

    Science.gov (United States)

    Muroff, Lawrence R

    2010-03-01

    Previously, a hospital contract meant tenure for the incumbent group of radiologists; however, those days are long gone. Exclusive contracts have morphed into exclusive contracts with carve-outs. Turf erosion has become a fact of life for radiology practices. Now radiologists are losing their hospital contracts in record numbers. Group size, though helpful for a variety of reasons, does not ensure that a practice will be secure in its hospital setting. The reasons that groups lose their hospital contracts are varied, and in this paper, the author discusses the most common ones. Suggestions to help practices avoid this unfortunate fate are presented.

  11. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  12. Contract Management of LHC Civil Engineering at Point 5

    CERN Document Server

    Osborne, J A

    1999-01-01

    Civil engineering work commenced in August 1998 at LEP Point 5 for the underground and surface works necessary to accommodate the CMS detector for the LHC project. The principal underground works consist of two parallel caverns, separated by a support pillar, two new shafts, a number of smaller connection and service galleries and tunnel enlargements on the existing LEP tunnel. The surface works consist of the 140 m long SX building for the detector assembly and numerous other steel and concrete structures necessary for the installation and operation of CMS. The civil engineering design and supervision has been awarded to a joint venture of Gibb (UK), SGI (Switzerland) and Geoconsult (Austria), and the contracting to a joint venture of Dragados (Spain) and Seli (Italy) for 112 MCHF. The aim of this paper is to discuss the management of this contract and in particular how the various parties interact in order to work most efficiently.

  13. IAEA research contracts. Fifth annual report

    International Nuclear Information System (INIS)

    1965-01-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  14. IAEA research contracts. Fifth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-04-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  15. Specification Section 01065S ES&H for Service Contracts

    Energy Technology Data Exchange (ETDEWEB)

    Kirsch, Greg C. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2014-07-01

    Section Includes: Requirements and guidelines in performance of work concerning protection of environment and property, and the safety and health of Contractors, Sandia National Laboratories (SNL) and Department of Energy (DOE) employees, visitors to SNL, and members of the public. This Section is applicable only to Service Contracts that do not involve construction or construction-like activities. Construction and construction-like activities are covered by Section 01065, Environment, Safety and Health (ES&H) for Construction Contracts. The entire ES&H program shall focus on safe-by-design intent, understanding the technical basis for the work, identifying and controlling energy sources, unacceptable consequences, risk assessments, and positive verification.

  16. Evaluation of dynamic range for LLNL streak cameras using high contrast pulses and pulse podiatry'' on the Nova laser system

    Energy Technology Data Exchange (ETDEWEB)

    Richards, J.B.; Weiland, T.L.; Prior, J.A.

    1990-07-01

    A standard LLNL streak camera has been used to analyze high contrast pulses on the Nova laser facility. These pulses have a plateau at their leading edge (foot) with an amplitude which is approximately 1% of the maximum pulse height. Relying on other features of the pulses and on signal multiplexing, we were able to determine how accurately the foot amplitude was being represented by the camera. Results indicate that the useful single channel dynamic range of the instrument approaches 100:1. 1 ref., 4 figs., 1 tab.

  17. Creating smart contracts using blockchain technology

    OpenAIRE

    Baronas, Erikas

    2018-01-01

    This paper presents Blockchain, crypto-currencie’s core technology analysis and smart cont- racts potentialities research. Bringing up two frameworks - Ethereum and Bitcoin - helps to un- derstand the principles of how decentralized system work and what solutions ensure data integrity and immutability in both technologies. The main goal of this work - prove, that smart contracts can be used in real world system model. Paper egzamines prototypes, which increase exponentially by their complexit...

  18. U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies

    Science.gov (United States)

    2011-11-07

    Report No. DODIG-2012-017 November 7, 2011 U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies...Contracting and Gift Policies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...HERITAGE AND HISTORY COMMAND SUBJECT: U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies (Report No. DODIG-2012-017) We are

  19. Lawrence Livermore National Laboratory (LLNL) Oxide Material Representation in the Material Identification and Surveillance (MIS) Program, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Riley, D C; Dodson, K

    2004-06-30

    The Materials Identification and Surveillance (MIS) program was established within the 94-1 R&D Program to confirm the suitability of plutonium-bearing materials for stabilization, packaging, and long-term storage under DOE-STD-3013-2000. Oxide materials from different sites were chemically and physically characterized. The adequacy of the stabilization process parameters of temperature and duration at temperature (950 C and 2 hours) for eliminating chemical reactivity and reducing the moisture content to less than 0.5 weight percent were validated. Studies also include surveillance monitoring to determine the behavior of the oxides and packaging materials under storage conditions. Materials selected for this program were assumed to be representative of the overall inventory for DOE sites. The Quality Assurance section of the DOE-STD-3013-2000 required that each site be responsible for assuring that oxides packaged according to this standard are represented by items in the MIS characterization program. The purpose of this document is to define the path for determining if an individual item is ''represented'' in the MIS Program and to show that oxides being packaged at Lawrence Livermore National Laboratory (LLNL) are considered represented in the MIS program. The methodology outlined in the MIS Representation Document (LA-14016-MS) for demonstrating representation requires concurrence of the MIS working Group (MIS-WG). The signature page on this document provides for the MIS-WG concurrence.

  20. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  1. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  2. Energetic aspects of skeletal muscle contraction: implications of fiber types.

    Science.gov (United States)

    Rall, J A

    1985-01-01

    In this chapter fundamental energetic properties of skeletal muscles as elucidated from isolated muscle preparations are described. Implications of these intrinsic properties for the energetic characterization of different fiber types and for the understanding of locomotion have been considered. Emphasis was placed on the myriad of physical and chemical techniques that can be employed to understand muscle energetics and on the interrelationship of results from different techniques. The anaerobic initial processes which liberate energy during contraction and relaxation are discussed in detail. The high-energy phosphate (approximately P) utilized during contraction and relaxation can be distributed between actomyosin ATPase or cross-bridge cycling (70%) and the Ca2+ ATPase of the sacroplasmic reticulum (30%). Muscle shortening increases the rate of approximately P hydrolysis, and stretching a muscle during contraction suppresses the rate of approximately P hydrolysis. The economy of an isometric contraction is defined as the ratio of isometric mechanical response to energetic cost and is shown to be a fundamental intrinsic parameter describing muscle energetics. Economy of contraction varies across the animal kingdom by over three orders of magnitude and is different in different mammalian fiber types. In mammalian skeletal muscles differences in economy of contraction can be attributed mainly to differences in the specific actomyosin and Ca2+ ATPase of muscles. Furthermore, there is an inverse relationship between economy of contraction and maximum velocity of muscle shortening (Vmax) and maximum power output. This is a fundamental relationship. Muscles cannot be economical at developing and maintaining force and also exhibit rapid shortening. Interestingly, there appears to be a subtle system of unknown nature that modulates the Vmax and economy of contraction. Efficiency of a work-producing contraction is defined and contrasted to the economy of contraction

  3. FORMATION AND DEVELOPMENT PROSPECTS BASED PAY EFFECTIVE CONTRACT

    Directory of Open Access Journals (Sweden)

    Владимир Иванович Долгий

    2014-01-01

    Full Text Available In this article examines the application of the principle of «effective contract», the contracting institution to be introduced into the system of labor relations. Purpose of the article is to offer an effective method of the contract for the design of incentives to domestic enterprises of different ownership forms, including the budget. Distinctive features of the work, reflecting its novelty is the use of a set of methods and techniques for building an effective motivational model, as well as practical experience in implementation of the proposed instruments in the activities of Russian enterprises. At the heart of the functioning of this institution are techniques improve the fairness of the forms and payroll systems. With the proposed program can be measured by the individual results of specific employees. Using the «effective contract» to be used in schools to improve the motivation of the teaching staff.DOI: http://dx.doi.org/10.12731/2218-7405-2013-9-61

  4. Army Contract Specialists’ Lack of Desire to Become Contracting Officers

    Science.gov (United States)

    2012-05-01

    response to question 2 was 1 or 2, choose all the responses that support the reasoning for your answer. B ). N o t en o u g h w el l tr ai n ed...contracting specialist set the goal of becoming a contracting officer? ACC 20 Contracting officer burnout Consider contracting officer rotations every 2 to

  5. Gas Atomization Equipment Statement of Work and Specification for Engineering design, Fabrication, Testing, and Installation

    Energy Technology Data Exchange (ETDEWEB)

    Boutaleb, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pluschkell, T. P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-11-30

    The Gas Atomization Equipment will be used to fabricate metallic powder suitable for Powder Bed Fusion additive Manufacturing material to support Lawrence Livermore National Laboratory (LLNL) research and development. The project will modernize our capabilities to develop spherical reactive, refractory, and radioactive powders in the 10-75 μm diameter size range at LLNL.

  6. Strictly contractive quantum channels and physically realizable quantum computers

    International Nuclear Information System (INIS)

    Raginsky, Maxim

    2002-01-01

    We study the robustness of quantum computers under the influence of errors modeled by strictly contractive channels. A channel T is defined to be strictly contractive if, for any pair of density operators ρ, σ in its domain, parallel Tρ-Tσ parallel 1 ≤k parallel ρ-σ parallel 1 for some 0≤k 1 denotes the trace norm). In other words, strictly contractive channels render the states of the computer less distinguishable in the sense of quantum detection theory. Starting from the premise that all experimental procedures can be carried out with finite precision, we argue that there exists a physically meaningful connection between strictly contractive channels and errors in physically realizable quantum computers. We show that, in the absence of error correction, sensitivity of quantum memories and computers to strictly contractive errors grows exponentially with storage time and computation time, respectively, and depends only on the constant k and the measurement precision. We prove that strict contractivity rules out the possibility of perfect error correction, and give an argument that approximate error correction, which covers previous work on fault-tolerant quantum computation as a special case, is possible

  7. 48 CFR 36.214 - Special procedures for price negotiation in construction contracting.

    Science.gov (United States)

    2010-10-01

    ... price negotiation in construction contracting. 36.214 Section 36.214 Federal Acquisition Regulations... negotiation in construction contracting. (a) Agencies shall follow the policies and procedures in part 15 when... scope of the work. If negotiations reveal errors in the Government estimate, the estimate shall be...

  8. Inflation Forecast Contracts

    OpenAIRE

    Gersbach, Hans; Hahn, Volker

    2012-01-01

    We introduce a new type of incentive contract for central bankers: inflation forecast contracts, which make central bankers’ remunerations contingent on the precision of their inflation forecasts. We show that such contracts enable central bankers to influence inflation expectations more effectively, thus facilitating more successful stabilization of current inflation. Inflation forecast contracts improve the accuracy of inflation forecasts, but have adverse consequences for output. On balanc...

  9. 48 CFR 27.405-1 - Special works.

    Science.gov (United States)

    2010-10-01

    ... content, performance, or disclosure of the data. Examples are contracts for— (1) The production of audiovisual works, including motion pictures or television recordings with or without accompanying sound, or... performance. Contracts for the production of audiovisual works, sound recordings, etc., may include...

  10. 48 CFR 37.602 - Performance work statement.

    Science.gov (United States)

    2010-10-01

    ... on the use of measurable performance standards and financial incentives in a competitive environment... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance work statement... CATEGORIES OF CONTRACTING SERVICE CONTRACTING Performance-Based Acquisition 37.602 Performance work statement...

  11. Between Status and Contract?

    Directory of Open Access Journals (Sweden)

    Thorsten Keiser

    2013-01-01

    Full Text Available This contribution deals with unfree labour in Germany from the early modern age until the beginning of the 20th century. It presents the main conclusions of a book published in 2013 on this subject in German. Unfree labour is not identified in the first place with slavery or any other labour relationship based on status. Instead, this study aims at an analysis of freedom and coercion in contractual labour relationships. It will be argued that in Germany contractual labour relationships before 1800 were embedded in a legal system that strongly restricted contractual autonomy and aimed at the suppression of free labour markets. The scope of this legislation was to guarantee efficient labour performance, which was not only perceived as being in the personal interest of an employer, but as a fundamental element of the common good. After 1800 the system changed to more incentive-based legislation that established freedom of contract for labour relations. Nevertheless, coercion in order to perform the contractual duties of a work contract remained important for many groups of workers, especially farmhands and industrial workers. The last criminal sanctions for breaches of labour contracts were only abolished in the revolution of 1919. This development shows the difficulties German law had in extending the principles of private law to workers. When a system of free labour was fully established, the issue of unemployment and economic problems, especially in the Weimar Republic, required a new system of protective rules. The history of free market based labour contracts in Germany was therefore very short, with state intervention shi ing from control and coercion to social assistance.

  12. Psychological contracts in self-directed work teams : Development of a validated scale and its effect on team commitment

    NARCIS (Netherlands)

    Schreuder, F.; Schalk, R.; de Jong, J.P.

    2017-01-01

    Purpose This study aims to examine reciprocal exchange in teams using a psychological contract (PC) framework. Adopting Rousseau’s conceptualization of the contract, the authors explore the extent to which the team members reciprocate perceived team obligations and fulfilment by adjusting their own

  13. Development and perspectives of principles of european insurance contract law

    Directory of Open Access Journals (Sweden)

    Ana Keglević

    2013-01-01

    Full Text Available Summary: Principles of European Insurance Contract Law (PEICL provides for a set of principles, definitions and model rules exclusively addressing general law for insurance contract. This work has been preformed within greater project for the creation of Common frame of reference on European contract law initiated by the Commission in 2003. PEICL is essentially designed to perform two basic functions. It would improve the quality of the EU acquis in the area of contract law, remove differences and achieve higher degree of divergences between contract laws of the Member states, and even help the national legislators when enacting legislation or Courts with the possible interpretation of the acquis. On the other hand PEICL could be adopted as an optional instrument, thus offering the common platform for contracting in the area of insurance law on the EU level. Possible Optional instrument would exist parallel with, rather instead of, national insurance contract laws. European Parliament resolution of 2011 on policy options for progress towards a European Contract Law for consumers and businesses and corresponding Green Paper of 2010 show positive tendency towards optional instrument in the legal form of Regulation. This would suit the requirements of the insurance sector. However, there are numerous signals showing adversely. For that reason this paper analyses the development and the status of Principles of European Insurance Contract Law particularly the status and perspectives of Principles within the project for the creation of European contract law.

  14. Reconciling Contracts and Relational Governance through Strategic Contracting

    DEFF Research Database (Denmark)

    Petersen, Bent; Østergaard, Kim

    2018-01-01

    on contract types, such as strategic versus conventional, may reconcile the enduring research controversy between the substitution and complements perspectives. Practical implications: Today, formal contracts with foreign distributors tend to resemble “prenuptial agreements”. The opportunity for relational...

  15. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    and supply chain management policies in an effort to deliver higher returns for their companies ( KPMG , 2012). As purchasing becomes increasingly more...conservation, hazardous materials , and ozone-depleting substances (NCMA, 2011). Contract Structures (1.5) has to do with identifying specific contract types...discusses time and material contracts as well as cost, performance, and delivery incentives. Incentive and award-fee contracts pertaining to fixed-price

  16. “I Can Only Work So Hard Before I Burn Out.” A Time Sensitive Conceptual Integration of Ideological Psychological Contract Breach, Work Effort, and Burnout

    Science.gov (United States)

    Jones, Samantha K.; Griep, Yannick

    2018-01-01

    Employees often draw meaning from personal experiences and contributions in their work, particularly when engaging in organizational activities that align with their personal identity or values. However, recent empirical findings have demonstrated how meaningful work can also have a negative effect on employee’s well-being as employees feel so invested in their work, they push themselves beyond their limits resulting in strain and susceptibility to burnout. We develop a framework to understand this “double edged” role of meaningful work by drawing from ideological psychological contracts (iPCs), which are characterized by employees and their employer who are working to contribute to a shared ideology or set of values. Limited iPC research has demonstrated employees may actually work harder in response to an iPC breach. In light of these counterintuitive findings, we propose the following conceptual model to theoretically connect our understanding of iPCs, perceptions of breach, increases in work effort, and the potential “dark side” of repeated occurrences of iPC breach. We argue that time plays a central role in the unfolding process of employees’ reactions to iPC breach over time. Further, we propose how perceptions of iPC breach relate to strain and, eventually, burnout. This model contributes to our understanding of the role of time in iPC development and maintenance, expands our exploration of ideology in the PC literature, and provides a framework to understanding why certain occupations are more susceptible to instances of strain and burnout. This framework has the potential to guide future employment interventions in ideology-infused organizations to help mitigate negative employee outcomes. PMID:29479334

  17. “I Can Only Work So Hard Before I Burn Out.” A Time Sensitive Conceptual Integration of Ideological Psychological Contract Breach, Work Effort, and Burnout

    Directory of Open Access Journals (Sweden)

    Samantha K. Jones

    2018-02-01

    Full Text Available Employees often draw meaning from personal experiences and contributions in their work, particularly when engaging in organizational activities that align with their personal identity or values. However, recent empirical findings have demonstrated how meaningful work can also have a negative effect on employee’s well-being as employees feel so invested in their work, they push themselves beyond their limits resulting in strain and susceptibility to burnout. We develop a framework to understand this “double edged” role of meaningful work by drawing from ideological psychological contracts (iPCs, which are characterized by employees and their employer who are working to contribute to a shared ideology or set of values. Limited iPC research has demonstrated employees may actually work harder in response to an iPC breach. In light of these counterintuitive findings, we propose the following conceptual model to theoretically connect our understanding of iPCs, perceptions of breach, increases in work effort, and the potential “dark side” of repeated occurrences of iPC breach. We argue that time plays a central role in the unfolding process of employees’ reactions to iPC breach over time. Further, we propose how perceptions of iPC breach relate to strain and, eventually, burnout. This model contributes to our understanding of the role of time in iPC development and maintenance, expands our exploration of ideology in the PC literature, and provides a framework to understanding why certain occupations are more susceptible to instances of strain and burnout. This framework has the potential to guide future employment interventions in ideology-infused organizations to help mitigate negative employee outcomes.

  18. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Science.gov (United States)

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  19. LLNL Radiation Protection Program (RPP) Rev 9.2, Implementation of 10 CFR 835, 'Occupational Radiation Protection'

    Energy Technology Data Exchange (ETDEWEB)

    Shingleton, K. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2011-06-15

    The Department of Energy (DOE) originally issued Part 10 CFR 835, Occupational Radiation Protection, on January 1, 1994. This regulation, hereafter referred to as “the Rule”, required DOE contractors to develop and maintain a DOE-approved Radiation Protection Program (RPP); DOE approved the initial Lawrence Livermore National Laboratory (LLNL) RPP (Rev 2) on 6/29/95. DOE issued a revision to the Rule on December 4, 1998 and approved LLNL’s revised RPP (Rev 7.1) on 11/18/99. DOE issued a second Rule revision on June 8, 2007 (effective July 9, 2007) and on June 13, 2008 approved LLNL’s RPP (Rev 9.0) which contained plans and measures for coming into compliance with the 2007 Rule changes. DOE issued a correction to the Rule on April 21, 2009.

  20. Contracts in Public Administration

    Directory of Open Access Journals (Sweden)

    Agnieszka GRZESIOK-HOROSZ

    2011-03-01

    Full Text Available Objectives: The present makes a contribution to the discussion on contracts in administration under Polish law. It concentrates on theoretical issues, but ones of considerable practical significance. Prior Work though relatively poorly explored, field. This paper is a result of academic considerations on the classical institution of civil law, namely a bilateral juridical act significance of this area may be demonstrated by the fact that one scientific conference and a collection of papers have been devoted to contracts in administration. as research method, the analysis of jurisprudence and doctrinal writings referring to law currently in force. The paper discusses as well the draft of the administrative law, and includes comparative remarks. put forward certain comments pertainin legislation. The authors formulate as well outline theses interesting but complicated matters. As a voice in the doctrinal dispute it can als useful for law students. Value composition. Starting from gener the binding law and proposed amendments. The functioning in foreign countries and proposals of regulatory solutions.

  1. Real options theory to the pricing of allowances contract to carbon emission

    International Nuclear Information System (INIS)

    Horii, Leticia Takahashi; Parente, Virginia; Goldemberg, Jose

    2010-01-01

    The objective of this work is to develop a pricing model contract for allowances to emit carbon through Real Options. Emissions allowances are equivalent tons of carbon traded between Annex I countries from companies that have the ability to reduce their emissions beyond what is assigned to it. The surplus of emission reductions produced by these companies may be sold in the emissions market. Thus, this work can contribute to improving the management of contractual risk and enable companies estimated the price at which a contract can be signed. Properly evaluate the contracts that the market environment is a challenge for companies. The historic low of information and randomness in the price of carbon allowances in the spot market suggest extreme caution in its use. (author)

  2. [The state of the psychological contract and its relation with employees' psychological health].

    Science.gov (United States)

    Gracia, Francisco Javier; Silla, Inmaculada; Peiró, José María; Fortes-Ferreira, Lina

    2006-05-01

    In the present paper the role of the state of the psychological contract to predict psychological health results is studied in a sample of 385 employees of different Spanish companies. Results indicate that the state of the psychological contract significantly predicts life satisfaction, work-family conflict and well-being beyond the prediction produced by the content of the psychological contract. In addition, trust and fairness, two dimensions of the state of psychological contract, all together contribute to explain these psychological health variables adding value to the role as predictor of fulfillment of the psychological contract. The results support the approach argued by Guest and colleagues.

  3. Precarious Pedagogies? The Impact of Casual and Zero-Hour Contracts in Higher Education

    Directory of Open Access Journals (Sweden)

    Ana Lopes

    2015-05-01

    Full Text Available Precarious work is associated with and characterizes the effects of neoliberal policy—the transference of economic risk onto workers, the erosion of workers’ rights, the flexibilization and casualization of work contracts, self-responsibility, financial insecurity, and emotional stress. In the Higher Education (HE sector, the number of insecure academic jobs, especially zero-hour contracts for hourly paid teaching and short-term contract research, has grown exponentially in recent years in response to the structural and fiscal changes within universities, which reflect these global shifts. This paper presents findings from a pilot study conducted with academics on casual contracts in HE institutions in England and Wales. Qualitative interviews and focus groups were undertaken with teachers (lecturers and tutors on hourly paid and zero-hour contracts to examine the relationship between their contractual situations and pedagogical practices. The research broadly seeks to contribute to ongoing discussions concerned with the impact of neoliberalism on higher education and specifically highlights the case of contingent lecturers as casualties of the casualization of the academic labor force.

  4. Contracts for joint provision of local public services

    Directory of Open Access Journals (Sweden)

    Francisco José Villar Rojas

    2017-09-01

    Full Text Available This paper studies the way a Local authority can provide a public service of its competence jointly or cooperatively with other public authorities. Specifically, article 12.4 of Directive 2014/24 /EU, on «contracts for the joint provision of public services», is analyzed. Its basis and the conditions that must be fulfilled for its valid use are studied, as it is an exception to the rules on public works contracts. The conclusion is that European law supports and regulates a traditional way of managing local public services.

  5. Modeling Laser-Plasma Interaction over a Suite of NIF Experiments

    Science.gov (United States)

    Strozzi, D. J.; Berger, R. L.; Jones, O. S.; Chapman, T.; Woods, D. T.; MacLaren, S. A.; Michel, P.; Divol, L.

    2017-10-01

    We systematically study laser-plasma interaction (LPI) on NIF indirect-drive experiments, namely backscatter and cross-beam energy transfer. LLNL's best practice radiation-hydrodynamic simulation methodology in the Lasnex simulation code is employed without ad-hoc tuning to match experimental data. This entails converged numerical resolution, an improved DCA model for coronal (ne 1 keV) gold opacity, electron heat flux strongly limited to 0.03neTe3 / 2 me- 1 / 2 , and the inline CBET model. The rad-hydro plasma conditions are used for LPI analysis, namely linear instability gains, and the paraxial-envelope code pF3D. Simulated scattered-light spectra are also compared to measurements. We initially focus on shots with low backscatter, so its self-consistent treatment should not be important. These shots have low hohlraum fill density and short laser pulses, and the only significant backscatter is outer-beams Brillouin. Our long-term goals are to understand reflectivity trends to guide target design and develop LPI mitigation strategies. Work performed under auspices of US DoE by LLNL under Contract DE-AC52-07NA27344.

  6. Current status of radiation transport tools for proliferation and terrorism prevention

    International Nuclear Information System (INIS)

    Sale, K.E.

    2004-01-01

    Full text: We will present the current status and future plans for the set of calculational tools and databases developed and maintained at LLNL. The calculational tools include the Monte Carlo codes TART 1) and COG 2) as well as the deterministic code ARDRA 3) . In addition to these codes we use currently there is a major development effort for a new massively parallel transport code. An important part of the capability we're developing is a sophisticated user interface, based on a commercial 3-D modeling product, to improve the model development process. A major part of this user interface tool is being developed by Strela 4) under the Nuclear Cities Initiative. Strela has developed a hub-and-spoke technology for code input interconversions (between COG, TART and MCNP) and will produce the plug-ins that extend the capabilities of the 3-D modeler for use as a radiation transport input generator. The major advantages of this approach are the built-in user interface for 3-D modeling and the ability to read a large variety of CAD-file formats. In addition to supporting our current radiation transport codes and developing new capabilities we are working on some nuclear data needs for homeland security. These projects are carried out and the Lawrence Berkeley National Laboratory 88' cyclotron and at the Institute for Nuclear Research of the Nation Academy of Science of Ukraine under and STCU contract. Reference: 1. http://www.llnl.gov/cullen1/mc/htm; 2. http://www-phys.llnl.gov/N_Div/COG/ETR/ETR_9306.html; 3. http://www.llnl.gov/CASC/asciturb/talks/PPT-HTML.131596/tsld030.htm; 4. http://strela.snz.ru/

  7. 13 CFR 305.13 - Contract change orders.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Contract change orders. 305.13 Section 305.13 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE... all such work will be at the Recipient's risk until EDA completes its review. ...

  8. Psychological contracts and commitment amongst nurses and nurse managers: a discourse analysis.

    Science.gov (United States)

    McCabe, T J; Sambrook, Sally

    2013-07-01

    Few studies explore the link between the psychological contracts and the commitment of nursing professionals in the healthcare sector, and how perceived breaches of the psychological contract can impact on nurses' commitment levels. This study explores the connections between the psychological contracts and organisational and professional commitment of nurses and nurse managers. Semi-structured interviews were conducted with nurses and nurse managers, to explore the connections between their psychological contracts and organisational and professional commitment. Large acute and small community organisation within the British National Health Service. 28 nurses and 11 nurse managers working within an acute and a community sector organisation - 20 and 19 in each organisation. Participants were selected through a process of purposive sampling, reflecting variations in terms of age, grade, ward and tenure. A discourse analysis was conducted on the qualitative data from the thirty nine semi-structured interviews. Two overall themes emerged, professional and managerial values. Professional values included the sub-themes: professional recognition; immediate work environment - leadership and peer support; professional development and progression. Sub-themes under managerial values included: involvement; general management; resource management. The findings suggest that nurses and nurse managers are governed by relational psychological contracts, underpinned by an affective and to a lesser extent normative commitment towards the nursing profession. They emphasise 'professional values', and professional commitment, as the basis for positive psychological contracts amongst nursing professionals. There was anecdotal evidence of relational psychological contract breach, with decreasing job satisfaction as the outcome of perceived psychological contract breach. Positive psychological contracts and commitment levels amongst nursing professionals can be supported by managers been

  9. Contract gangs: race, gender and vulnerability

    Directory of Open Access Journals (Sweden)

    Heather Goodall

    2015-12-01

    Full Text Available While violence directed at Indian students in Australian cities has been highlighted in the Indian and Australian press, far less attention has been paid to the violence directed at Indians in rural areas. This has most often involved Indians employed in contract labour in seasonal industries like fruit or vegetable picking. This article reviews various media accounts, both urban and rural, of violence directed at Indians from 2009 to 2012. It draws attention to the far longer history of labour exploitation which has taken place in rural and urban Australia in contract labour conditions and the particular invisibility of rural settings for such violence. Racial minorities, like Aboriginal and Chinese workers, and women in agriculture and domestic work, have seldom had adequate power to respond industrially or politically. This means that in the past, these groups been particularly vulnerable to such structural exploitation. The paper concludes by calling for greater attention not only to the particular vulnerability of Indians in rural settings but to the wider presence of racialised and gendered exploitation enabled by contract labour structures.

  10. 48 CFR 436.605 - Government cost estimate for architect-engineer work.

    Science.gov (United States)

    2010-10-01

    ... for architect-engineer work. 436.605 Section 436.605 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.605 Government cost estimate for architect-engineer work. The contracting...

  11. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  12. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  13. A Longitudinal Study of Age-Related Differences in Reactions to Psychological Contract Breach

    NARCIS (Netherlands)

    Bal, P.M.; Lange, A.H. de; Jansen, P.G.W.; Velde, M.E.G. van der

    2013-01-01

    The current paper investigated age-related differences in the relations of psychological contract breach with work outcomes over time. Based on affective events theory, we expected job satisfaction to mediate the longitudinal relationship of contract breach with changes in job performance. Moreover,

  14. A longitudinal study of age-related differences in reactions to psychological contract breach

    NARCIS (Netherlands)

    Bal, P.M.; de Lange, A.H.; Jansen, P.G.W.; van der Velde, E.G.

    2013-01-01

    The current paper investigated age-related differences in the relations of psychological contract breach with work outcomes over time. Based on affective events theory, we expected job satisfaction to mediate the longitudinal relationship of contract breach with changes in job performance. Moreover,

  15. a longitudinal study of age-related differences in reactions to phsycological contract breach

    NARCIS (Netherlands)

    Paul Jansen; Annet de Lange; Matthijs Bal; Mandy van der Velde

    2013-01-01

    The current paper investigated age‐related differences in the relations of psychological contract breach with work outcomes over time. Based on affective events theory, we expected job satisfaction to mediate the longitudinal relationship of contract breach with changes in job performance. Moreover,

  16. Supersize my identity: when thoughts of contracting swine flu boost one's patriotic identity

    NARCIS (Netherlands)

    Bélanger, J.J.; Faber, T.; Gelfand, M.J.

    2013-01-01

    Pandemics are socially threatening situations that rapidly spread across large regions. Thinking of contracting dangerous diseases can potentially evoke fear and death-related thoughts. The aim of the present work was to investigate how individuals respond to fear associated with contracting a

  17. Compact Environmental Anomaly Sensor (CEASE) Flight Integration Support Contract

    National Research Council Canada - National Science Library

    Redus, Robert

    2001-01-01

    .... Under the current contract, Amptek Inc, supported the successful spacecraft specific design work, final calibration, and the delivery, integration, and launch of two CEASE instruments - S/N 001 onto...

  18. INVESTIGATING WHAT ROMANIAN IT RECRUITERS AND EMPLOYEES VALUE WHEN THEY NEGOTIATE EMPLOYMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Anca Maria CLIPA

    2017-12-01

    Full Text Available When negotiating, people have economic as well noneconomic, subjective concerns. This study is an exploratory investigation into the objective and subjective factors influencing employment contract negotiations and the willingness to interact in future business negotiations in the case of Romanian IT employees and recruiters. The study draws on qualitative data collection and analysis methods, i.e. semi-structured interviews with 10 participants, projective techniques and content analysis. At the time, 5 of the participants held recruitment and contracting HR roles, and 5 were working as employees (programmers, business analysts, IT project managers. They all had a recent working contract negotiation experience (less than one year ago in the IT industry. Using the principles of corpus linguistics and the methods specific to discourse and critical discourse analysis, our study highlights some of the factors taken into account by Romanian IT employees and recruiters in employment contract negotiations.

  19. 48 CFR 47.207-2 - Duration of contract and time of performance.

    Science.gov (United States)

    2010-10-01

    ... performance of segments of a major job; e.g., an office relocation for which the work phases must be... time of performance. 47.207-2 Section 47.207-2 Federal Acquisition Regulations System FEDERAL...-Related Services 47.207-2 Duration of contract and time of performance. The contracting officer shall— (a...

  20. 48 CFR 35.005 - Work statement.

    Science.gov (United States)

    2010-10-01

    .... (b) In basic research the emphasis is on achieving specified objectives and knowledge rather than on... between work statements for fixed-price contracts and cost-reimbursement contracts should be even clearer...

  1. Availability and the use of work-life balance benefits guaranteed by the Polish Labour Code among workers employed on the basis of employment contracts in small and medium enterprises

    OpenAIRE

    Aleksandra Andysz; Aleksandra Jacukowicz; Aleksander Stańczak; Marcin Drabek

    2016-01-01

    Objectives: Polish Labour Code provides employees with a range of solutions (benefits) supporting them in achieving balance between work and private life. This paper was aimed at indicating availability and the use of legal benefits supporting work-life balance (WLB) among Polish workers of small and medium enterprises. Material and Methods: The study sample included 219 respondents, aged 22–64, working in small and medium enterprises and employed on the basis of employment contracts for at l...

  2. Unfair contract terms in B2C contracts

    NARCIS (Netherlands)

    Hesselink, M.W.; Loos, M.B.M.

    2012-01-01

    Because of its textual similarity to the Unfair Terms Directive 1993, Chapter 8 of the proposed CESL, on ‘Unfair contract terms’, can benefit from two decades of interpretative experience which is likely to provide a comparably high degree of instant legal certainty to contracting parties.

  3. Did the Labor Contracts between the UAW and the Big Three Automakers Work?

    Science.gov (United States)

    Lucas, John J.; Furdek, Jonathan M.

    2010-01-01

    In the Fall 2007, there were landmark labor contracts agreed upon between the United Autoworkers (UAW) and the Big Three Automakers--General Motors, Ford Motor Company, and Chrysler LLC. The impetus for these truly historic labor agreements was to afford the automakers to remain competitive in the global market while labor was to be protected.…

  4. Teaching about Contracts.

    Science.gov (United States)

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  5. Attenuation Drift in the Micro-Computed Tomography System at LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Dooraghi, Alex A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Brown, William [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Seetho, Isaac [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kallman, Jeff [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lennox, Kristin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Glascoe, Lee [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-01-12

    The maximum allowable level of drift in the linear attenuation coefficients (μ) for a Lawrence Livermore National Laboratory (LLNL) micro-computed tomography (MCT) system was determined to be 0.1%. After ~100 scans were acquired during the period of November 2014 to March 2015, the drift in μ for a set of six reference materials reached or exceeded 0.1%. Two strategies have been identified to account for or correct the drift. First, normalizing the 160 kV and 100 kV μ data by the μ of water at the corresponding energy, in contrast to conducting normalization at the 160 kV energy only, significantly compensates for measurement drift. Even after the modified normalization, μ of polytetrafluoroethylene (PTFE) increases linearly with scan number at an average rate of 0.00147% per scan. This is consistent with PTFE radiation damage documented in the literature. The second strategy suggested is the replacement of the PTFE reference with fluorinated ethylene propylene (FEP), which has the same effective atomic number (Ze) and electron density (ρe) as PTFE, but is 10 times more radiation resistant. This is important as effective atomic number and electron density are key parameters in analysis. The presence of a material with properties such as PTFE, when taken together with the remaining references, allows for a broad range of the (Ze, ρe) feature space to be used in analysis. While FEP is documented as 10 times more radiation resistant, testing will be necessary to assess how often, if necessary, FEP will need to be replaced. As radiation damage to references has been observed, it will be necessary to monitor all reference materials for radiation damage to ensure consistent x-ray characteristics of the references.

  6. Psychological contract breaches, organizational commitment, and innovation-related behaviors: a latent growth modeling approach.

    Science.gov (United States)

    Ng, Thomas W H; Feldman, Daniel C; Lam, Simon S K

    2010-07-01

    This study examined the relationships among psychological contract breaches, organizational commitment, and innovation-related behaviors (generating, spreading, implementing innovative ideas at work) over a 6-month period. Results indicate that the effects of psychological contract breaches on employees are not static. Specifically, perceptions of psychological contract breaches strengthened over time and were associated with decreased levels of affective commitment over time. Further, increased perceptions of psychological contract breaches were associated with decreases in innovation-related behaviors. We also found evidence that organizational commitment mediates the relationship between psychological contract breaches and innovation-related behaviors. These results highlight the importance of examining the nomological network of psychological contract breaches from a change perspective.

  7. Return to work of workers without a permanent employment contract, sick-listed due to a common mental disorder: design of a randomised controlled trial.

    Science.gov (United States)

    Lammerts, Lieke; Vermeulen, Sylvia J; Schaafsma, Frederieke G; van Mechelen, Willem; Anema, Johannes R

    2014-06-12

    Workers without a permanent employment contract represent a vulnerable group within the working population. Mental disorders are a major cause of sickness absence within this group. Common mental disorders are stress-related, depressive and anxiety disorders. To date, little attention has been paid to effective return to work interventions for this type of sick-listed workers. Therefore, a participatory supportive return to work program has been developed. It combines elements of a participatory return to work program, integrated care and direct placement in a competitive job.The objective of this paper is to describe the design of a randomised controlled trial to evaluate the cost-effectiveness of this program compared to care as usual. The cost-effectiveness of the participatory supportive return to work program will be examined in a randomised controlled trial with a follow-up of twelve months.The program strongly involves the sick-listed worker in the identification of obstacles for return to work and possible solutions, resulting in a consensus based action plan. This plan will be used as a starting point for the search of suitable competitive employment with support of a rehabilitation agency. During this process the insurance physician of the sick-listed worker contacts other caregivers to promote integrated care.Workers eligible to participate in this study have no permanent employment contract, have applied for a sickness benefit at the Dutch Social Security Agency and are sick-listed between two and fourteen weeks due to mental health problems.The primary outcome measure is the duration until first sustainable return to work in a competitive job. Outcomes are measured at baseline and after three, six, nine and twelve months. If the participatory supportive return to work program proves to be cost-effective, the social security system, the sick-listed worker and society as a whole will benefit. A cost-effective return to work program will lead to a

  8. Actively coping with violation : Exploring upward dissent patterns in functional, dysfunctional, and deserted psychological contract end states

    NARCIS (Netherlands)

    Schalk, M.J.D.; De Ruiter, M.; Van Loon, J.; Kuijpers, E.; Van Regenmortel, M.R.F.

    2018-01-01

    Recently, scholars have emphasized the importance of examining how employees cope with psychological contract violation and how the coping process contributes to psychological contract violation resolution and post-violation psychological contracts. Recent work points to the important role of

  9. Governance in Blockchain Technologies & Social Contract Theories

    Directory of Open Access Journals (Sweden)

    Wessel Reijers

    2016-12-01

    Full Text Available This paper is placed in the context of a growing number of social and political critiques of blockchain technologies. We focus on the supposed potential of blockchain technologies to transform political institutions that are central to contemporary human societies, such as money, property rights regimes, and systems of democratic governance. Our aim is to examine the way blockchain technologies canbring about - and justify - new models of governance. To do so, we draw on the philosophical works of Hobbes, Rousseau, and Rawls, analyzing blockchain governance in terms of contrasting social contract theories. We begin by comparing the justifications of blockchain governance offered by members of the blockchain developers’ community with the justifications of governance presented within social contract theories. We then examine the extent to which the model of governance offered by blockchain technologies reflects key governance themes and assumptions located within social contract theories, focusing on the notions of sovereignty, the initial situation, decentralization and distributive justice.

  10. The role of collective labor contracts and individual characteristics on job satisfaction in Tuscan nursing homes.

    Science.gov (United States)

    Vainieri, Milena; Smaldone, Pierluigi; Rosa, Antonella; Carroll, Kathleen

    2017-08-23

    The role played by remuneration strategies in motivating health care professionals is one of the most studied factors. Some studies of nursing home (NH) services, while considering wages and labor market characteristics, do not explicitly account for the influence of the contract itself. This study investigates the relationship between the labor contracts applied in 62 Tuscan NHs and NH aides' job satisfaction with two aims: to investigate the impact of European contracts on employee satisfaction in health care services and to determine possible limitations of research not incorporating these contracts. We apply a multilevel model to data gathered from a staff survey administered in 2014 to all employees of 62 NHs to analyze two levels: individual and NH. Labor contracts were introduced into the model as a variable of NH. Findings show that the factors influencing nursing aides' satisfaction occur at both the individual and NH levels. Organizational characteristics explain 16% of the variation. For individual characteristics, foreign and temporary workers emerge as more satisfied than others. For NH variables, results indicate that the labor contract with the worst conditions is not associated with lower workers' satisfaction. Although working conditions play a relevant role in the job satisfaction of aides, labor contracts do not seem to affect it. Interestingly, aides of the NHs with the contract having the best conditions register a significantly lower level of satisfaction compared to the NHs with the worst contract conditions. This suggests that organizational factors such as culture, team work, and other characteristics, which were not explicitly considered in this study, may be more powerful sources of worker satisfaction than labor contracts. Our analysis has value as a management tool to consider alternative sources as well as the labor contract for employee incentives.This is an open-access article distributed under the terms of the Creative Commons

  11. The effects of hospitals' governance on optimal contracts: bargaining vs. contracting.

    Science.gov (United States)

    Galizzi, Matteo M; Miraldo, Marisa

    2011-03-01

    We propose a two-stage model to study the impact of different hospitals' governance frameworks on the optimal contracts designed by third-party payers when patients' disease severity is the private information of the hospital. In the second stage, doctors and managers interact within either a bargaining or a contracting scenario. In the contracting scenario, managers offer a contract that determines the payment to doctors, and doctors decide how many patients to treat. In the bargaining scenario, doctors and managers strategically negotiate on both the payment to doctors and the number of patients to treat. We derive the equilibrium doctors' payments and number of treated patients under both scenarios. We then derive the optimal contract offered by the government to the hospital in the first stage. Results show that when the cost of capital is sufficiently low, the informational rent is lower, and the social welfare is higher, in the contracting scenario. Copyright © 2010 Elsevier B.V. All rights reserved.

  12. The profound precariousness of work through temporary work agency

    Directory of Open Access Journals (Sweden)

    Mihaela-Emilia Marica

    2016-12-01

    Full Text Available The increase in the number of atypical work contracts in the field of industry relationships, as part of a major European trend towards gaining more flexibility in the labour market, is significant and cannot be overlooked in most member countries of the European Union. This finding is corroborated by the recent surveys conducted across Europe, that reveal the prevalence of these flexible ways of organizing work, over the archetypal template of the individual work contract. However, this range of atypical contractual arrangements and the great number of versions and subcategories they include, are describing a number of negative features that seem to characterize these new forms of employment. Since the field of atypical employment is complex and we cannot analyse the incidence of these negative effects for all the atypical methods of employment, in the following article we will limit ourselves to explore the pressing issues related to the system of temporary work through work agencies. As we shall see, all aspects of the salary field, of health and safety at work and the level of insecurity and instability of labour through temporary work agency reveals a strong character associated with this kind of precarious employment.

  13. 48 CFR 2937.103-70 - Department of Labor checklist to aid analysis and review of requirements for service contracts.

    Science.gov (United States)

    2010-10-01

    ... provide for adequate monitoring of contractor performance? (3) Is the statement of work written so that it... contract? (4) Will the contractor be evaluating a competitor's work? (5) Does the contract allow the...

  14. Promised and Delivered Inducements and Contributions: An Integrated View of Psychological Contract Appraisal

    Science.gov (United States)

    Lambert, Lisa Schurer

    2011-01-01

    The reciprocal exchange of employees' work for pay that is central to employment relationships is viewed here through the lens of the psychological contract. A psychological contract involves promised inducements, promised contributions, delivered inducements, and delivered contributions: How an employee cognitively integrates these 4 elements is…

  15. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  16. The Relationship between the Employment Contract and other Civil Contracts

    Directory of Open Access Journals (Sweden)

    Răzvan Radu Popescu

    2015-05-01

    Full Text Available The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is unlike most other contracts. Although the parties will have negotiated the main terms, we shall see that a large number of terms will be implied into the agreement from all sorts of different sources and will not have been individually negotiated by the parties at all. This is what makes an employment contract so different from other contracts. We think this article is an important step in the disclosure of the problem eraised by these two concepts.

  17. A participatory supportive return to work program for workers without an employment contract, sick-listed due to a common mental disorder: an economic evaluation alongside a randomized controlled trial.

    NARCIS (Netherlands)

    Lammerts, L.; van Dongen, J.M.; Schaafsma, F.G.; van Mechelen, W.; Anema, J.R.

    2017-01-01

    BACKGROUND: Mental disorders are associated with high costs for productivity loss, sickness absence and unemployment. A participatory supportive return to work (RTW) program was developed in order to improve RTW among workers without an employment contract, sick-listed due to a common mental

  18. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    . An opportunity the member states should consider using when procuring a PPP. This paper looks at the negotiation and contracting of a PPP in an economic theoretical and EU public procurement perspective and discusses how to establish an efficient PPP contract under a strong public law doctrine. Governments......This paper concerns Public Private Partnership (PPP) contracts in concern to the coming new 2014/24IEU public procurement directive. The new EU public procurement directive gives the public authority the opportunity to negotiate PPPs much more when they are implemented in national law...... procurement law. Furthermore, the paper seeks to establish a connection between public law, private law and the efficient PPP contract by drawing upon economic theory and empirical contract data from UK, US and Danish partnering contracts from the construction industry and the aim of contracting joint utility...

  19. [Work satisfaction among Spanish nurses working in English hospitals].

    Science.gov (United States)

    Ruzafa-Martínez, María; Madrigal-Torres, Manuel; Velandrino-Nicolás, Antonio; López-Iborra, Lidón

    2008-01-01

    To evaluate work satisfaction among Spanish nurses employed by English hospitals, as well as the influence of several social and work-related variables associated with satisfaction. We performed a cross-sectional study. All Spanish nurses (n=360) with a contract with any English hospital in April 2003 were included in the study. The self-administered and validated Font Roja work satisfaction questionnaire was used. The response rate was 78.6%. Overall work satisfaction among Spanish nurses was medium. The dimensions with higher work satisfaction were relationships with colleagues and superiors. The dimensions showing lowest work satisfaction were job satisfaction and professional competence. Statistically significant and positive associations were obtained between level of English, professional grade, shift pattern, working in the intensive care unit or accident and emergency department, time worked in English hospitals and degree of work satisfaction. Employers of Spanish nurses should try to increase job satisfaction and professional competence among these workers. Incentivation and professional promotion systems might help achieve this aim. Employers could also try to improve Spanish nurses' English level before contracts are signed and pay special attention to their needs during the first working year. Spanish nurses job satisfaction would also increase if they were allowed to choose their working shift and the unit or ward where they are going to work.

  20. Managing the training process: contracting for training services

    International Nuclear Information System (INIS)

    Carlson, E.R.

    1985-01-01

    The need for using consultants and contracting for training services should be based on one or more of these three major reasons: the need to expand capability on a crash basis, the need for specialized expertise, and the need for objectivity, and independence. When the need for using a consultant exists, the training manager must first define the scope of work or services the consultant is to provide and how the consultant will interface with the training staff. The next step will be to develop a Request for Proposal which involves management, training staff, and contract services organizations. The critical parts of an RFP are scope and schedule. Consideration would be given to determining which consultant organizations should receive the RFP, and specifying who is on the bidders list. The third step will consist of evaluating the proposals and awarding the work. This step needs to be objective, defendable, and repeatable. The final phase will be the performance of the work. The activities included are project initiation, monitoring contractor performance, and formal conclusion

  1. Duration in Production Contracts

    OpenAIRE

    MacDonald, James M.; Korb, Penelope J.

    2006-01-01

    We use 2003 and 2004 ARMS data to analyze variations in contract duration among growers of broilers who hold production contracts. Most contracts cover just a single flock, but many extend for 1-2 years, and a significant minority of broiler contracts specify lengths of 5, 10, and even 15 years. We find that grower debt and production volume are inversely related to the choice of a short term (a year or less) contract, while lengthy prior experience with the contractor promotes short term con...

  2. Psychological contract in the light of flexible employment: The review of studies

    Directory of Open Access Journals (Sweden)

    Dorota Żołnierczyk-Zreda

    2016-08-01

    Full Text Available Changing employment relations between employees and employers due to the increasing employment flexibility have contributed to the development of a new paradigm to analyze these relations based on the concept of psychological contract. This paradigm might be particularly relevant in Poland where the employment flexibility understood as the number of workers with temporary contracts is the highest in Europe. In this paper the concept of psychological contract is presented along with the existing findings related to its range, balance and contract fulfilment vs. contract breach. The results of studies showing the differences in psychological contract of temporary and permanent workers are also presented. The majority of them indicate that psychological contracts of temporary workers are limited in their extent, less balanced and asymmetric (to workers’ disadvantage, as well as more transactional in their nature than those of permanent workers. The temporary workers’ well-being and attitudes towards work and their reaction to psychological contract breach largely depends on their preferences for this type of employment, on their qualifications and on a labor market situation. Med Pr 2016;67(4:529–536

  3. OBJECT OF THE CONTRACT FROM THE PERSPECTIVE OF THE CURRENT CIVIL CODE

    Directory of Open Access Journals (Sweden)

    Raluca Antoanetta TOMESCU

    2017-07-01

    Full Text Available An indispensable element of social relations, primarily the contract governs our existence. Virtually anything in our lives is governed by contracts. Any move we make, school, work performed, marriage, holidays, a house or a new car, will lead to the acceptance of a contract, or are a consequence of their existence. In the light of the codifications set forth in the current Civil Code, which regularly follows the modern proposals for contract rules, the legislator gives us a clear perspective on its essential conditions of validity. Thus, along with the ability to contract and the consent of the parties, as essential conditions of validity of the contract, the cause and object of the contract also arise. The purpose of this study is therefore to reflect upon the meaning of some terms such as "the object of the contract", "the object of the obligation" or "the object of the benefit" in agreement with the regulations contained in the current Civil Code, especially because in practice but sometimes also in legal doctrine, sufficient attention is not given to the legal sense of each of them, the current rule bringing clarifying regulations.

  4. Adjudication and Aribitrability of Government Construction Contracts ...

    African Journals Online (AJOL)

    The former laws apply where a private individual or company usually referred to as 'employer' (otherwise known as 'owner' or 'client') enters into a construction contract with a contractor. And the latter involves a government department which intends to have construction works carried out on behalf of the government for ...

  5. Experiments on supply chain contracting: effects of contract type and fairness concerns

    OpenAIRE

    Arabacı, Özge; Arabaci, Ozge

    2013-01-01

    In this thesis, we conduct experiments with human decision makers on supply chain contracting. We consider a simple manufacturer-retailer supply chain scenario where the retailer faces the newsvendor problem. Building on Sahin and Kaya (2011), we compare the experimental performance of three contract types (wholesale price, buyback and revenue sharing contracts) between the firms with theoretical predictions, and among each other. We are interested in the manufacturer’s contract parameter dec...

  6. Defense Contract Management: DOD's Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    National Research Council Canada - National Science Library

    Hutton, John P; Ahearn, Marie; Augustine, Penny B; Campbell, Greg; James, Jr., Arthur; Lesonsky, Eric; Lord, Stephen; McDonough-Hughes, Anne; McKelvey, Janet; Patton, Kenneth

    2007-01-01

    .... The contract was also used to ensure adequate fuel supplies inside Iraq. RIO I was a cost-plus-award-fee type contract that provided for payment of the contractor's costs, a fixed fee determined at inception of the contract, and a potential award fee...

  7. IAEA research contracts. Fourth annual report

    International Nuclear Information System (INIS)

    1964-01-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  8. IAEA research contracts. Fourth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-04-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  9. Contracts, Performance Measurement and Accountability in the Public Sector

    DEFF Research Database (Denmark)

    Drewry, Gavin; Greve, Carsten; Tanquerel, Thierry

    This book addresses issues to do with public accountability, audit and performance measurement that are both highly topical and of crucial importance to the theory and practice of public administration in an era of contractualized public management. The literature on public sector contracting...... of audit and accountability in a variety of countries and contexts; the third part offers some wider, cross-cutting perspectives. Based on the work of the EGPA permanent study group on the history of contractualization, Contracts, Performance Measurement and Accountability in the Public Sector draws upon...... - covering both 'hard' agreements (ones that are legally enforceable) and 'soft' agreements (enforced by negotiation and mutual trust) - has been growing for some time and the present book adds a primarily European perspective on contracting, performance-based management and accountability. One important...

  10. Contract portfolio optimization for a gasoline supply chain

    Science.gov (United States)

    Wang, Shanshan

    Major oil companies sell gasoline through three channels of trade: branded (associated with long-term contracts), unbranded (associated with short-term contracts), and spot market. The branded channel provides them with a long-term secured and sustainable demand source, but requires an inflexible long-term commitment with demand and price risks. The unbranded channel provides a medium level of allocation flexibility. The spot market provides them with the greatest allocation flexibility to the changing market conditions, but the spot market's illiquidity mitigates this benefit. In order to sell the product in a profitable and sustainable way, they need an optimal contract portfolio. This dissertation addresses the contract portfolio optimization problem from different perspectives (retrospective view and forward-looking view) at different levels (strategic level, tactical level and operational level). The objective of the retrospective operational model is to develop a financial case to estimate the business value of having a dynamic optimization model and quantify the opportunity values missed in the past. This model proves the financial significance of the problem and provides top management valuable insights into the business. BP has applied the insights and principles gained from this work and implemented the model to the entire Midwest gasoline supply chain to retrospectively review optimization opportunities. The strategic model is the most parsimonious model that captures the essential economic tradeoffs among different contract types, to demonstrate the need for a contract portfolio and what drives the portfolio. We examine the properties of the optimal contract portfolio and provide a comparative statics analysis by changing the model parameters. As the strategic model encapsulates the business problem at the macroscopic level, the tactical model resolves lower level issues. It considers the time dynamics, the information flow and contracting flow. Using

  11. Trapped Electron Instability of Electron Plasma Waves: Vlasov simulations and theory

    Science.gov (United States)

    Berger, Richard; Chapman, Thomas; Brunner, Stephan

    2013-10-01

    The growth of sidebands of a large-amplitude electron plasma wave is studied with Vlasov simulations for a range of amplitudes (. 001 vph = +/-ωbe , where vph =ω0 /k0 and ωbe is the bounce frequency of a deeply trapped electron. In 2D simulations, we find that the instability persists and co-exists with the filamentation instability. This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344 and funded by the Laboratory Research and Development Program at LLNL under project tracking code 12-ERD.

  12. In vitro contraction of cytokinetic ring depends on myosin II but not on actin dynamics.

    Science.gov (United States)

    Mishra, Mithilesh; Kashiwazaki, Jun; Takagi, Tomoko; Srinivasan, Ramanujam; Huang, Yinyi; Balasubramanian, Mohan K; Mabuchi, Issei

    2013-07-01

    Cytokinesis in many eukaryotes involves the contraction of an actomyosin-based contractile ring. However, the detailed mechanism of contractile ring contraction is not fully understood. Here, we establish an experimental system to study contraction of the ring to completion in vitro. We show that the contractile ring of permeabilized fission yeast cells undergoes rapid contraction in an ATP- and myosin-II-dependent manner in the absence of other cytoplasmic constituents. Surprisingly, neither actin polymerization nor its disassembly is required for contraction of the contractile ring, although addition of exogenous actin-crosslinking proteins blocks ring contraction. Using contractile rings generated from fission yeast cytokinesis mutants, we show that not all proteins required for assembly of the ring are required for its contraction in vitro. Our work provides the beginnings of the definition of a minimal contraction-competent cytokinetic ring apparatus.

  13. Intramuscular fatty acid metabolism in contracting and non-contracting human skeletal muscle

    DEFF Research Database (Denmark)

    Sacchetti, M; Saltin, B; Osada, T

    2002-01-01

    The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercis...... and degraded and that the metabolic fate of plasma NEFA entering the muscle is influenced by muscle contraction, so that a higher proportion is directed towards oxidation at the expense of storage in mTAG.......The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercise.......05) in the contracting muscle, whereas it was unchanged in the non-contracting muscle. The uptake of plasma NEFA, as well as the proportion directed towards oxidation, was higher in the exercising compared to the non-exercising leg, whereas the rate of palmitate incorporation into mTAG was fourfold lower (0.70 +/- 0...

  14. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  15. MEDIATION CLAUSE IN COMMERCIAL CONTRACTS (THE ADVANTAGES OF MEDIATION CLAUSE IN COMMERCIAL CONTRACTS

    Directory of Open Access Journals (Sweden)

    Claudiu Florinel Augustin Ignat

    2013-11-01

    Full Text Available It often happens that the end of the contracts to be existing commercial relationships and a new contract has already intuitu personae character. But not always the case, that those who enter into legal commercial forcing consideration to the benefits and under commercial contracts, know the dealer or individual that established commercial relations. These traders resort to contractual conditions which states precisely the extent of the obligations assumed by each party, setting rules, deadlines, penalties and even ways of interpretation of contracts. Contracting Parties, namely traders aware that the law is the contract parties by special caluze invest ( to settle disputes concerning the interpretation or punishment for failure and even termination obligations tribunalule arbitration courts or the territorial and material .

  16. Flexible forms of working hours

    OpenAIRE

    Knapp, Viktor

    2017-01-01

    66 Abstract - Flexible forms of working hours This diploma thesis deals with the flexible forms of working hours and its goal is to describe this issue in intelligible and comprehensive way. It is being very interesting and current theme which is to a great extent not subject to direct legal regulations and provides its contracting parties with a big amount of freedom of contract. This fact assists in bigger flexibilization of labour market and represents a significant instrument in the fight...

  17. Belene nuclear power plant contracting approach

    International Nuclear Information System (INIS)

    Tankosic, D.; Mignone, O.

    2004-01-01

    Historically, three main types of project execution and contractual approaches have been applied to energy and industrial projects, including nuclear projects. These approaches are grouped into three broad categories: 1) Turnkey Approach; 2) Split Package (Island) Approach; and 3)Multiple Package Approach. Based on a preliminary screening done by an ongoing feasibility study work for NPP Belene (NEK contract to Parsons E and C), the recommended approach is going to follow that general trend i.e., with some variation between the Split Package and the Turnkey approach. Before deciding on an execution approach or at least before issuing bid specifications for the nuclear power plant, it is prudent, even for a country with existing nuclear power program (like Bulgaria), to re-check/verify capabilities of the interested bidders to handle contracts of this size and nature. During the last decades, nuclear energy went through a substantial restructuring and most of the capabilities (human and financial) that existed before are not any more available. This re-checking should mainly cover the experience of the bidders as regards the design, construction and operation of the stations where they were involved, but also include items such as local experience, capability to bring favorable financing, liability coverage, general background, potential and organizational structures. The advantages and disadvantages for the Owner of the three contracting approaches can be briefly summarized as follows: Turnkey Approach - main advantages: all responsibilities rest in a Contractor or Consortium. Main disadvantages - limited project control by Owner and restricted local participation. For Split Package Contract Approach main advantage are more favorable financing conditions and increased local participation. Main disadvantage is the increased interface problems. For Multiple package Contract Approach main advantages are the opportunity to tailor the plant and maximum increase of local

  18. Why haven’t weather derivatives been more successful as futures contracts? A case study

    Directory of Open Access Journals (Sweden)

    Hilary Till

    2015-10-01

    Full Text Available Why have some seemingly promising futures contracts not succeeded in the recent past? In this paper, we examine one such example, the weather derivatives market. In two companion working papers, we also analyze two other futures market failures: namely, in the pulp market and in the uranium market. The structure of this paper is as follows. First we provide a brief history of weather derivatives contracts as well as a description of these contracts. Next we review customized over-the-counter (OTC weather derivatives contracts, as provided by reinsurers, and then we review why futures contracts are not as successful a method of risk transfer. Lastly we describe how weather exposures do not sufficiently match up against the criteria for the successful launch of a futures contract

  19. Second-Class Citizen? Contract Workers' Perceived Status, Dual Commitment and Intent to Quit

    Science.gov (United States)

    Boswell, Wendy R.; Watkins, Maria Baskerville; Triana, Maria del Carmen; Zardkoohi, Asghar; Ren, Run; Umphress, Elizabeth E.

    2012-01-01

    Outsourcing of jobs to contract workers who work alongside a client's employees has changed the human resource landscape of many organizations. In this study we examine how a contract worker's perceived employment status similarity to the client's own standard employees influences his/her affective commitment to both the client and the employer…

  20. THE PSYCHOLOGICAL CONTRACT

    Directory of Open Access Journals (Sweden)

    Blanca Giorgiana GRAMA

    2015-04-01

    Full Text Available The psychological contract became known as a research paradigm within corporate research, providing a broad framework which explains the employee-company relations. Despite all this, there are still many debates on the concept and a series of criticism were expressed that led to the necessity of some more rigorous theoretical and empirical analysis. The psychological contract refers to the unwritten, implicit expectations that employees have from the company and vice versa; it is that which defines the things the employee expects from the employer. Consequently, each of the parties involved in the contract may have different perceptions on these commitments and obligations. Thus the psychological contract may be regarded as an exchange relation between the employer and the employee. Breaking the psychological contract affects the performance, the morale, and the motivation of the staff in a negative manner. The information presented in this paper is intended to contribute to the theoretical and methodological development of the concept.

  1. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  2. Pricing of contract options for electric power; Precificacao de contrato de opcoes de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, Leticia; Gunn, Laura Keiko; Correia, Paulo B. [Universidade Estadual de Campinas (FEM/UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica. Dept. de Energia

    2008-07-01

    The reorganization of the electric sector has improved the opportunity of energy trade through contracts, which have to be considered on the risk evaluation for generating companies. Different types of contracts have been used in electric energy commercialization. This work develops a model for option contract pricing. The classic model of options pricing used in the financial market is based in Black- Scholes. Due to the inherent feature of the Brazilian electrical system, with a strong predominance of hydroelectricity, the seasonal swing of the electricity price is the main source of contractual risk. So, the Black-Scholes model very is not adjusted. To deal with the uncertainties, this work uses an approach based on analysis of scenarios and binomial trees. Case studies are analyzed with binomial tree to calculate the price of the option contract. (author)

  3. Practical guide on contract of technology

    International Nuclear Information System (INIS)

    Choi, Chiho

    1991-12-01

    This book gives descriptions of practical guide on contract of technology, which deals with basic of contract like meaning, function term, singing and sealing, contract and stamp tax, common things on contract of research like keeping secret and prevention and treat of dispute, compensation for damages, notice, expiration date of contract and measurement at end of contract, contract of joint research such as meaning and necessity, note at contract, check list at contract, and return of the research product.

  4. On-site and off-site forensic analysis capabilities for proliferation and terrorism prevention

    International Nuclear Information System (INIS)

    Whipple, R.E.; Nunes, P.J.; Reynolds, J.G.; Alcaraz, A.; Hart, B.R.

    2004-01-01

    Full text: We will present current on-site technologies that can be utilized for the screening of explosives, chemical agents, and environmental contaminants. These techniques must have the capability to detect various hazardous materials at very low levels, since they pose a major challenge for first responders. Specifically, the technology must detect concealed explosives or chemical agents on-site rapidly. Lawrence Livermore National Laboratory (LLNL) is currently developing several different high explosive screening and detection technologies for field use. Two technologies that have demonstrated an ability to screen for explosives at low levels are colorimetric spot tests and thin layer chromatography (TLC). Another technology that has demonstrated usefulness for the on-site analysis of unknowns is portable gas chromatography-mass spectrometry (GC-MS) with solid phase micro-extraction (SPME) sampling. Several examples utilizing these technologies and their usefulness will be presented. In addition to developing on-site screening methods, LLNL is an Organization for the Prohibition of Chemical Weapons (OPCW) designated laboratory and is certified to accept CW suspect samples. Currently, LLNL is expanding its ISO-17025 certification to include nuclear forensics and explosives. These off-site forensic analysis capabilities and certified procedures will support the needs for homeland security. We will highlight some of the ISO-17025 requirements to accredit procedures, handle samples, and reports. Work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under contract W-7405-ENG-48

  5. On-site and off-site forensic analysis capabilities for proliferation and terrorism prevention

    International Nuclear Information System (INIS)

    Hart, B.R.; Whipple, R.E.; Nunes, P.J.; Reynolds, J.G.; Alcaraz, A.

    2004-01-01

    We present current on-site technologies that can be utilized for the screening of explosives, chemical agents, and environmental contaminants. These techniques must have the capability to detect various hazardous materials at very low levels, since they pose a major challenge for first responders. Specifically, the technology must detect concealed explosives or chemical agents on-site rapidly. Lawrence Livermore National Laboratory (LLNL) is currently developing several different high explosive screening and detection technologies for field use. Two technologies that have demonstrated an ability to screen for explosives at low levels are colorimetric spot tests and thin layer chromatography (TLC). Another technology that has demonstrated usefulness for the on-site analysis of unknowns is portable gas chromatography-mass spectrometry (GC-MS) with solid phase micro-extraction (SPME) sampling. Several examples utilizing these technologies and their usefulness will be presented. In addition to developing on-site screening methods, LLNL is an Organization for the Prohibition of Chemical Weapons (OPCW) designated laboratory and is certified to accept CW suspect samples. Currently, LLNL is expanding its ISO-17025 certification to include nuclear forensics and explosives. These off-site forensic analysis capabilities and certified procedures will support the needs for homeland security. We will highlight some of the ISO-17025 requirements to accredit procedures, handle samples, and reports. Work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under contract W-7405-ENG-48. (author)

  6. Concept of contracting authority

    OpenAIRE

    Kasiliauskaitė, Vitalija

    2016-01-01

    Concept of Contracting Authority Law on Public Procurement the procurement concept implies the conclusion that public procurement be declared only such purchases are carried out by the contracting authority. The contracting authorities can be a subject of state and municipal management institutes, whose assignment authority is determined by a functional approach. Also, contracting authorities may be public and legal entities, but that the public interest and operates non-commercial activities...

  7. Evaluating opportunities for direct contracting between employers and physician-hospital organizations.

    Science.gov (United States)

    Straley, P F; Swaim, C R

    1994-01-01

    Employers seeking to reduce health care expenditures are turning to direct contracting as a way to control provider cost increases. In a direct contract, the participation of third parties is minimized. The health care provider and a corporate buyer directly negotiate a price agreement for the delivery of health care services. However, as managed care penetration increases, the ability of hospitals and physicians to assume risk while providing high quality, cost effective care will be paramount. Physicians and hospitals who choose to work together may find a physician-hospital organization an effective vehicle to meet the current and future market challenges of direct contracting.

  8. New transport and handling contract

    CERN Multimedia

    SC Department

    2008-01-01

    A new transport and handling contract entered into force on 1.10.2008. As with the previous contract, the user interface is the internal transport/handling request form on EDH: https://edh.cern.ch/Document/TransportRequest/ To ensure that you receive the best possible service, we invite you to complete the various fields as accurately as possible and to include a mobile telephone number on which we can reach you. You can follow the progress of your request (schedule, completion) in the EDH request routing information. We remind you that the following deadlines apply: 48 hours for the transport of heavy goods (up to 8 tonnes) or simple handling operations 5 working days for crane operations, transport of extra-heavy goods, complex handling operations and combined transport and handling operations in the tunnel. For all enquiries, the number to contact remains unchanged: 72202. Heavy Handling Section TS-HE-HH 72672 - 160319

  9. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  10. Industrial Services Contracts

    CERN Document Server

    2006-01-01

    This document gives an overview of Industrial Services contracts at CERN, including the probable expenditure in 2006 and the estimated expenditure for 2007. The Finance Committee is invited: - to take note of the revised amount in 2006 for Industrial Services contracts referred to in this document of 138.02 MCHF at 2006 prices compared to the previously anticipated amount of 122.67 MCHF at 2005 prices; - to take note that the estimated amount in 2007 for the contracts referred to in this document will be 112.54 MCHF at 2006 prices; - for the reasons set out in this document, the Finance Committee is also invited to approve the requests for the contracts presented and highlighted in the Annexes.

  11. Sandia National Laboratories: Working with Sandia: Procurement:

    Science.gov (United States)

    ; Technology Defense Systems & Assessments About Defense Systems & Assessments Program Areas Audit Sandia's Economic Impact Licensing & Technology Transfer Browse Technology Portfolios Contract Audit Working with Sandia Construction and Facilities Sandia establishes contracts to support

  12. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  13. Environmental impact report addendum for the continued operation of Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Weston, R. F.

    1996-01-01

    An environmental impact statement/environmental impact report (ES/EIR) for the continued operation and management of Lawrence Livermore National Laboratory (LLNL) was prepared jointly by the U.S. Department of Energy (DOE) and the University of California (UC). The scope of the document included near-term (within 5-10 years) proposed projects. The UC Board of Regents, as state lead agency under the California Environmental Quality Act (CEQA), certified and adopted the EIR by issuing a Notice of Determination on November 20, 1992. The DOE, as the lead federal agency under the National Environmental Policy Act (NEPA), adopted a Record of Decision for the ES on January 27, 1993 (58 Federal Register [FR] 6268). The DOE proposed action was to continue operation of the facility, including near-term proposed projects. The specific project evaluated by UC was extension of the contract between UC and DOE for UC's continued operation and management of LLNL (both sites) from October 1, 1992, through September 30, 1997. The 1992 ES/EIR analyzed impacts through the year 2002. The 1992 ES/EIR comprehensively evaluated the potential environmental impacts of operation and management of LLNL within the near-term future. Activities evaluated included programmatic enhancements and modifications of facilities and programs at the LLNL Livermore site and at LLNL's Experimental Test Site (Site 300) in support of research and development missions 2048 established for LLNL by Congress and the President. The evaluation also considered the impacts of infrastructure and building maintenance, minor modifications to buildings, general landscaping, road maintenance, and similar routine support activities

  14. Environmental management assessment of the Lawrence Livermore National Laboratory Livermore, California

    International Nuclear Information System (INIS)

    1994-06-01

    This report documents the results of the Environmental Management Assessment performed at the Lawrence Livermore National Laboratory (LLNL), Livermore, CA. LLNL is operated by the University of California (UC) under contract with the U.S. Department of Energy (DOE). Major programs at LLNL include research, development, and test activities associated with the nuclear design aspects of the nuclear weapons life cycle and related national security tasks; inertial confinement fusion; magnetic fusion energy; biomedical and environmental research; laser isotope separation; energy-related research; beam research physics; and support to a variety of Defense and other Federal agencies. During this assessment, activities and records were reviewed and interviews were conducted with personnel from management and operating contractor, Lawrence Livermore National Laboratory; DOE Oakland Operations Office; and DOE Headquarters Program Offices, including the Office of Defense Programs, Office of Environmental Management, the Office of Nuclear Energy, and the Office of Energy Research. The onsite portion was conducted in June 1994, by the DOE Office of Environmental Audit. The goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission using systematic and periodic evaluations of DOE's environmental programs within line organizations, and through use of supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The Environmental Management Assessment of LLNL revealed that LLNL's environmental program is exemplary within the DOE complex and that all levels of LLNL management and staff consistently exhibit a high level of commitment to achieve environmental excellence

  15. Contracting under asymmetric holding cost information in a serial supply chain with a nearly profit maximizing buyer

    OpenAIRE

    Guido Voigt

    2012-01-01

    Screening contracts (or non-linear "menu of contracts") are frequently used for aligning the incentives in supply chains with private information. In this context, it is assumed that all supply chain parties are strictly (expected) profit maximizing and, therefore, sensible to even arbitrarily small pay-off differences between contract alternatives. However, previous behavioral work on contracting under asymmetric information in supply chains shows that agents (buyers) are not always strictly...

  16. Employee contract issues for dermatologists.

    Science.gov (United States)

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  17. Organisational commitment in the era of the new psychological contract

    Directory of Open Access Journals (Sweden)

    Anthonie Theron

    2011-08-01

    Full Text Available The aim of this study was to investigate organisational commitment in an organisation that had recently experienced organisational restructuring (a merger. The psychological contract that exists between employees and organisations is brittle due to many organisational changes that stem from organisational restructuring.  When psychological contracts are breached, employees may experience reduced commitment to the organisation.  The target population for this study consisted of all employees working at three recently-merged higher education institutions in the Nelson Mandela Metropolis (n=100 and a self-administered questionnaire was distributed amongst staff.  The results indicated that an increase in the number of positive human resource management (HRM practices reported by respondents correlated with a decrease in violation and breach of the psychological contract, despite organisational restructuring.  It was further revealed that effective management of the psychological contract is crucial during organisational restructuring, in order to maintain the commitment and loyalty of employees.

  18. Normalized Tritium Quantification Approach (NoTQA) a Method for Quantifying Tritium Contaminated Trash and Debris at LLNL

    International Nuclear Information System (INIS)

    Dominick, J.L.; Rasmussen, C.L.

    2008-01-01

    Several facilities and many projects at LLNL work exclusively with tritium. These operations have the potential to generate large quantities of Low-Level Radioactive Waste (LLW) with the same or similar radiological characteristics. A standardized documented approach to characterizing these waste materials for disposal as radioactive waste will enhance the ability of the Laboratory to manage them in an efficient and timely manner while ensuring compliance with all applicable regulatory requirements. This standardized characterization approach couples documented process knowledge with analytical verification and is very conservative, overestimating the radioactivity concentration of the waste. The characterization approach documented here is the Normalized Tritium Quantification Approach (NoTQA). This document will serve as a Technical Basis Document which can be referenced in radioactive waste characterization documentation packages such as the Information Gathering Document. In general, radiological characterization of waste consists of both developing an isotopic breakdown (distribution) of radionuclides contaminating the waste and using an appropriate method to quantify the radionuclides in the waste. Characterization approaches require varying degrees of rigor depending upon the radionuclides contaminating the waste and the concentration of the radionuclide contaminants as related to regulatory thresholds. Generally, as activity levels in the waste approach a regulatory or disposal facility threshold the degree of required precision and accuracy, and therefore the level of rigor, increases. In the case of tritium, thresholds of concern for control, contamination, transportation, and waste acceptance are relatively high. Due to the benign nature of tritium and the resulting higher regulatory thresholds, this less rigorous yet conservative characterization approach is appropriate. The scope of this document is to define an appropriate and acceptable

  19. Statements of work handbook. [technical writing for NASA programs

    Science.gov (United States)

    1975-01-01

    Guidelines are presented for preparing statements of work (SOW) to assure a consistent approach throughout NASA. Statements of work for study and preliminary definition contracts, for definition and development of major systems, for support services, and for small research and development contracts are discussed.

  20. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  1. Atomic Physics Measurements in Support of X-ray Astronomy

    Science.gov (United States)

    Beiersdorfer, Peter; Brown, G. V.; Kelley, R. E.; Kilbourne, C. A.; Leutenegger, M.; Porter, F. S.; Obst, M.; Lepson, J. K.; Desai, P.; Gu, M. F.

    2010-10-01

    X-ray astronomy has been a voracious consumer of atomic data, especially after the launch of the Chandra and XMM-Newton X-ray Observatories, which have produced very high-resolution grating spectra of point sources. One of the important issues has been to understand the physics underlying the Fe L-shell spectra, and the Fe XVII spectrum in particular. A lot of progress has been made, including measurements of the electron-impact and resonance excitation cross sections, which now provides a rather clear picture of the production mechanism of the Fe XVII spectrum. Recent measurements of the radiative rates provide additional information on the deexcitation channels, while investigations of dielectronic satellite transitions provide a measure of the electron temperature. Many questions, however, still remain. Work at LLNL was performed under the auspices of DOE under contract DE-AC53-07NA27344 and supported by NASA's APRA program under contracts NNH07AF81I and NNG06WF08I. Part of this work was supported by Chandra Cycle 10 Award AR9-0002X.

  2. Other enrichment related contracts

    International Nuclear Information System (INIS)

    Hall, J.C.

    1978-01-01

    In addition to long-term enrichment contracts, DOE has other types of contracts: (1) short-term, fixed-commitment enrichment contract; (2) emergency sales agreement for enriched uranium; (3) feed material lease agreement; (4) enriched uranium storage agreement; and (5) feed material usage agreement

  3. 48 CFR 836.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. The contracting officer shall insert the clause at 852.236-72, Performance of work by the contractor, in solicitations and contracts for construction that contain the FAR...

  4. Safety Case for Service Contracts

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, Israel L.

    2014-07-01

    Safety cases developed for the Facilities Management and Operations Center (FMOC) are based on the requirements in MN471021, Work Planning and Control Criteria for Safe Design and Operations. The FMOC performs maintenance activities in various locations at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM consists of more than 6,000,000 square feet of buildings, structures, and site infrastructure on approximately 13,000 acres of land. The FMOC performs approximately 7500 service contract work orders a year to assist with operations and maintenance at the SNL/NM site and facilities. As part of the continual improvement process, this Safety Case will be reviewed and updated, as needed, or at a minimum every three years.

  5. Work Front--Home Front: A Cooperative Extension Contribution to Work First in North Carolina.

    Science.gov (United States)

    DeBord, Karen; Matthews, D. Wayne; Canu, Rebecca; Parris, Pam

    North Carolina's Work First (WF) program, like other welfare reform programs, incorporates personal responsibility contracts; paid work, volunteer work, or school requirements; and time limitations. Using telephone interviews, this study examined perceptions of 31 former welfare recipients who were enrolled in the North Carolina Work First (WF)…

  6. The Implicit Contract: Implications for Health Social Work

    Science.gov (United States)

    McCoyd, Judith L. M.

    2010-01-01

    Identifying common patient dynamics is useful for developing social work practice sensitivity in health social work. This article draws on findings from a study of women who terminated desired pregnancies because of fetal anomalies and identifies dynamics that may be applicable to many health settings. Data suggest that women have expectations…

  7. 48 CFR 1316.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1316.406 Section 1316.406 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1316.406 Contract clauses. Insert a clause...

  8. 48 CFR 716.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  9. 48 CFR 916.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.307 Section 916.307 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.307 Contract clauses. (g) Insert the...

  10. 48 CFR 935.071 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 935.071... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.071 Contract clause. The contracting officer must insert the clause at 952.235-71, Research Misconduct, in contracts, including management and operating...

  11. A socio-emotional selectivity perspective on age-related differences in reactions to psychological contract breach

    NARCIS (Netherlands)

    Matthijs Bal; Paul Jansen; Annet de Lange; Mandy van der Velde

    2013-01-01

    The current paper investigated age-related differences in the relations of psychological contract breach with work outcomes over time. Based on affective events theory, we expected job satisfaction to mediate the longitudinal relationship of contract breach with changes in job performance. Moreover,

  12. 3 CFR - Government Contracting

    Science.gov (United States)

    2010-01-01

    ... contract oversight could reduce such sums significantly. Government outsourcing for services also raises... a risk that taxpayer funds will be spent on contracts that are wasteful, inefficient, subject to... mission. In such cases, the agency must ensure that the risks associated with noncompetitive contracts are...

  13. Temporary labour contracts

    CERN Document Server

    2000-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L 021/PE, L 022/PE, L 023/PE and L 024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) reached the end of their initial three-year contractual period at the end of December 1999. At CERN?s request, in September 1999 the Finance Committee approved an extension of these contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs (CERN/FC/4196). In December 1999, one of the five contractors, FIRCROFT, withdrew from its contract for 2000. Following the satisfactory execution of the four remaining contracts during 2000, CERN requests approval to extend them from January 2001 for the second of the two optional years provided for in the original adjudication. The Finance Committee is invited to approve the extension of the existing contracts until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices.

  14. Networks and informal contract law

    NARCIS (Netherlands)

    Tjong Tjin Tai, Eric; Brownsword, Roger; van Gestel, Rob A.J.; Micklitz, Hans-W.

    2017-01-01

    It is often argued that formal contract law cannot treat networks correctly. An analysis of networks in an informal contract law system shows that informal contract law is no panacea. Remaining problems require a different approach to legal regulation and contract practice.

  15. Characteristics of nuclear contracts. Pt. 1

    International Nuclear Information System (INIS)

    Blanchard, R.

    1976-01-01

    While the object of nuclear contracts is specific, these contracts are concluded according to proven techniques based on general regulations on contracts. Following a review of contract classification, they are differentiated according to the nature of the co-contracting parties, the purpose of the contract itself, the procedure for drawing up the contracts, and payment. The operations prior to the contract vary in that they may include a call for tenders, an option for delays or a letter of intent. (NEA) [fr

  16. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    Science.gov (United States)

    2016-09-01

    TO CONTRACTING OFFICER’S REPRESENTATIVES September 2016 By: Tanya V. Peel Angel R. Acevedo Advisors : Karen Landale Matthew Kremer...among contracting personnel and CORs requires improvement, staff levels need to be increased to support contract administration, managers nominate CORs...Landale, Lead Advisor Matthew Kremer, Support Advisor Brad Naegle Academic Associate Graduate School of Business and Public

  17. Adding Concurrency to Smart Contracts

    OpenAIRE

    Dickerson, Thomas; Gazzillo, Paul; Herlihy, Maurice; Koskinen, Eric

    2017-01-01

    Modern cryptocurrency systems, such as Ethereum, permit complex financial transactions through scripts called smart contracts. These smart contracts are executed many, many times, always without real concurrency. First, all smart contracts are serially executed by miners before appending them to the blockchain. Later, those contracts are serially re-executed by validators to verify that the smart contracts were executed correctly by miners. Serial execution limits system throughput and fails ...

  18. 48 CFR 732.111 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111... CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may... Agency-specific indefinite quantity contracts that are a combination of contract types. Rather than using...

  19. ENFORCEMENT OF MORTGAGE CONTRACT

    Directory of Open Access Journals (Sweden)

    Alisa A. BELU

    2016-07-01

    Full Text Available A chattel mortgage contract is the expression of a real guarantee that gives the creditor precedence over other creditors, in addition to the general pledge upon the belongings of the debtor. It refers to the sale of mortgaged movable assets, exclusively or prioritized in favor of the mortgaging creditor, in case the debtor does not comply with his / her commitments, under the signed mortgage contract. Beginning from this purpose, shared by both sides (as the chattel mortgage contract is synallagmatic, in case the debtor is unable to fulfill his / her commitments, the sides reach a situation of enforcement of the signed chattel mortgage contract. Given the legal status of the chattel mortgage contract [Art. 2387-2477 Noul Cod Civil , Universul Juridic, Bucureşti, 2016, ISBN 978-606-673-792-0], the principle of binding force of the contract and the principle according to which signed legal conventions will entail legal effects, the Romanian law maker developed the proper legal framework for the enforcement of the chattel mortgage contract. [art. 622 si urm. Noul Cod de Procedură Civilă, ed. Hamangiu, Bucureşti, 2016, ISBN 978-606-27-0459-9].

  20. Smart contracts sobre Bitcoin

    OpenAIRE

    Andreu Alemany, Josep Miquel

    2016-01-01

    El present treball final de màster realitza una introducció als smart contracts. El treball introdueix el concepte de contracte intel·ligent, els seus usos i alguns exemples existents. Seguidament proporciona les nocions necessàries de les transaccions del protocol Bitcoin per poder implementar un contracte intel·ligent, usant la blockchain que ofereix el protocol. Per últim, s'explica la implementació d'un contracte intel·ligent usant bitcoin: un canal de micropagaments. El presente traba...