WorldWideScience

Sample records for line replaceable units

  1. Defining line replaceable units

    NARCIS (Netherlands)

    Parada Puig, J. E.; Basten, R. J I

    2015-01-01

    Defective capital assets may be quickly restored to their operational condition by replacing the item that has failed. The item that is replaced is called the Line Replaceable Unit (LRU), and the so-called LRU definition problem is the problem of deciding on which item to replace upon each type of

  2. NIF Laser Line Replaceable Units (LRUs)

    International Nuclear Information System (INIS)

    Larson, D W

    2003-01-01

    The National Ignition Facility (NIF) is designed with its high value optical systems in cassettes called Line Replaceable Units (LRUs). Virtually all of the NIF's active components are assembled in one of the ∼4000 electrical and optical LRUs that serve between two and eight of NIF's 192 laser beam lines. Many of these LRUs are optomechanical assemblies that are roughly the size of a telephone booth. The primary design challenges for this hardware include meeting stringent mechanical precision, stability and cleanliness requirements. Pre-production units of each LRU type have been fielded on the first bundle of NIF and used to demonstrate that NIF meets its performance objectives. This presentation provides an overview of the NIF LRUs, their design and production plans for building out the remaining NIF bundles

  3. Moderator inlet line hanger replacement for Pickering nuclear power station

    International Nuclear Information System (INIS)

    Kirkpatrick, R.A.; Bowman, J.M.; Symmons, W.R.; El-Nesr, S.

    1988-01-01

    Ontario Hydro's Pickering Nuclear Generating Station (PNGS), Units 1 and 2 were shutdown for large scale fuel channel replacement. Other nonroutine inspection and maintenance activities were performed to determine the overall condition of the units and it was seen that a moderator inlet line hanger (identified as HR-29) had failed in both units. Subsequent inspections during planned maintenance outages of Pickering NGS Units 3 and 4 revealed that hanger HR-29 had failed and required replacement. A research program was conducted to find a suitable technique. These problems included accessing tooling through small inspection ports, manipulating tooling from a significant distance and the high radiation fields within the vault. This paper describes the program undertaken to replace hanger HR-29. (author)

  4. 24 CFR 970.31 - Replacement units.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement units. 970.31 Section... PUBLIC HOUSING PROGRAM-DEMOLITION OR DISPOSITION OF PUBLIC HOUSING PROJECTS § 970.31 Replacement units. Notwithstanding any other provision of law, replacement public housing units may be built on the original public...

  5. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    Hart, R.S.

    2006-01-01

    The Bruce A Generating Station consists of four 900 MW class CANDU units. The reactor and Primary Heat Transport System for each Unit are housed within a reinforced concrete reactor vault. A large duct running below the reactor vaults accommodates the shared fuel handling system, and connects the four reactor vaults to the vacuum building. The reactor vaults, fuelling system duct and the vacuum building constitute the station vacuum containment system. Bruce A Unit 2 was shut down in 1995 and Bruce A Units 1, 3 and 4 were shutdown in 1997. Bruce A Units 3 and 4 were returned to service in late 2003 and are currently operating. Units 1 and 2 remain out of service. Bruce Power is currently undertaking a major rehabilitation of Bruce A Unit 1 and Units 2 that will extend the in-service life of these units by at least 25 years. Replacement of the Steam Generators (eight in each unit) is required; this work was awarded to SNC-Lavalin Nuclear (SLN). The existing steam drums (which house the steam separation and drying equipment) will be retained. Unit 2 is scheduled to be synchronized with the grid in 2009, followed by Unit 1 in 2009. Each Bruce A unit has two steam generating assemblies, one located above and to each end of the reactor. Each steam generating assembly consists of a horizontal cylindrical steam drum and four vertical Steam Generators. The vertical Steam Generators connect to individual nozzles that are located on the underside of the Steam Drum (SD). The steam drums are located in concrete shielding structures (steam drum enclosures). The lower sections of the Steam Generators penetrate the top of the reactor vaults: the containment pressure boundary is established by bellows assemblies that connect between the reactor vault roof slab and the Steam Generators. Each Steam Generators is supported from the bottom by a trapeze that is suspended from the reactor vault top structure. The Steam Generator Replacement (SGR) methodology developed by SLN for Unit 1

  6. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    Hart, R.S.

    2007-01-01

    The Bruce A Generating Station consists of four 900 MW class CANDU units. The reactor and Primary Heat Transport System for each Unit are housed within a reinforced concrete reactor vault. A large duct running below the reactor vaults accommodates the shared fuel handling system, and connects the four reactor vaults to the vacuum building. The reactor vaults, fuelling system duct and the vacuum building constitute the station vacuum containment system. Bruce A Unit 2 was shut down in 1995 and Bruce A Units 1, 3 and 4 were shutdown in 1997. Bruce A Units 3 and 4 were returned to service in late 2003 and are currently operating. Units 1 and 2 remain out of service. Bruce Power is currently undertaking a major rehabilitation of Bruce A Unit 1 and Unit 2 that will extend the in-service tile of these units by at least 25 years. Replacement of the Steam Generators (eight in each unit) is required; this work was awarded to SNC-Lavalin Nuclear (SLN). The existing steam drums (which house the steam separation and drying equipment) will be retained. Unit 2 is scheduled to be synchronized with the grid in 2009, followed by Unit 1 in 2009. Each Bruce A unit has two steam generating assemblies, one located above and to each end of the reactor. Each steam generating assembly consists of a horizontal cylindrical steam drum and four vertical Steam Generators. The vertical Steam Generators connect to individual nozzles that are located on the underside of the Steam Drum (SD). The steam drums are located in concrete shielding structures (steam drum enclosures). The lower sections of the Steam Generators penetrate the top of the reactor vaults: the containment pressure boundary is established by bellows assemblies that connect between the reactor vault roof slab and the Steam Generators. Each Steam Generators is supported from he bottom by a trapeze that is suspended from the reactor vault top structure. The Steam Generator Replacement (SGR) methodology developed by SLN for Unit 1

  7. A replacement LH2 recirculation line before installation in Discovery

    Science.gov (United States)

    1999-01-01

    A spare four-inch diameter LH2 recirculation line (shown in photo) will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about =-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.

  8. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  9. Replacement of a cracked pressure tube in Bruce GS unit 2

    International Nuclear Information System (INIS)

    Dunn, J.T.

    1982-06-01

    In 1982 February, a primary heat transport system leak was detected in the annulus gas system by on-line instrumentation. The source of the leak was found to be a small axial crack in the pressure tube of fuel channel X-14. This fuel channel was removed and replaced by station maintenance staff, and the unit was returned to service five weeks after it had been shut down. The cracked pressure tube was sent to Chalk River Nuclear Laboratories for examination, and the crack was found to be very similar to those found in Pickering GS units 3 and 4 in 1974-75. It was caused by delayed hydride cracking during the period of high residual stress between the time of rolling and the pre-service stress relief

  10. Primary separator replacement for Bruce Unit 8 steam generators

    International Nuclear Information System (INIS)

    Roy, S.B.; Mewdell, C.G.; Schneider, W.G.

    2000-01-01

    During a scheduled maintenance outage of Bruce Unit 8 in 1998, it was discovered that the majority of the original primary steam separators were damaged in two steam generators. The Bruce B steam generators are equipped with GXP type primary cyclone separators of B and W supply. There were localized perforations in the upper part of the separators and large areas of generalized wall thinning. The degradation was indicative of a flow related erosion corrosion mechanism. Although the unit- restart was justified, it was obvious that corrective actions would be necessary because of the number of separators affected and the extent of the degradation. Repair was not considered to be a practical option and it was decided to replace the separators, as required, in Unit 8 steam generators during an advanced scheduled outage. GXP separators were selected for replacement to minimize the impact on steam generator operating characteristics and analysis. The material of construction was upgraded from the original carbon steel to stainless steel to maximize the assurance of full life. The replacement of the separators was a first of a kind operation not only for Ontario Power Generation and B and W but also for all CANDU plants. The paper describes the degradations observed and the assessments, the operating experience, manufacture and installation of the replacement separators. During routine inspection in 1998, many of the primary steam separators in two of steam generators at Bruce Nuclear Division B Unit 8 were observed to have through wall perforations. This paper describes assessment of this condition. It also discusses the manufacture and testing of replacement primary steam separators and the development and execution of the replacement separator installation program. (author)

  11. In-core monitor housing replacement at Fukushima Daiichi Unit No.4

    International Nuclear Information System (INIS)

    Arai, Tomoyuki

    1999-01-01

    The in-core monitor (ICM) housing replacement of a Boiling Water Reactor (BWR) has been completed at Fukushima-Daiichi Unit No. 4 (1F4) of the Tokyo Electric Power Company (TEPCO) in Japan. Since cracking of the inside surface of an ICM housing was found in this unit, the ICM housing was replaced with one made of low-carbon stainless steel (SS) to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. This project is the first application of the replacement procedure for the ICM housing and employs various advanced technologies. The outline of the ICM housing replacement project and applied technologies are discussed in this paper. (author)

  12. Pressure tube replacement in Pickering NGS A units 1 and 2

    International Nuclear Information System (INIS)

    Irvine, H.S.; Bennett, E.J.; Talbot, K.H.

    1986-10-01

    Being able to technically and economically replace the most radioactive components (excluding the nuclear fuel) in operating reactors will help to ensure the ongoing acceptance of nuclear power as a viable energy source for the future. Ontario Hydro is well along the path to meeting the above objective for its CANDU-PHW reactors. Following the failure of a Zircaloy-II pressure tube in unit 2 of Pickering NGS A in August, 1983, Ontario Hydro has embarked on a program to replace all Zircaloy-II pressure tubes in units 1 and 2 at Pickering. This program integrates the in-house research, design, construction, and operating skills of a large utility (Ontario Hydro) with the skills of a national nuclear organization (Atomic Energy of Canada Limited) and the private engineering sector of the Canadian nuclear industry. The paper describes the background to the pressure tube failure in Pickering unit 2 and to the efforts incurred in understanding the failure mechanism and how similar failures are not expected for the zirconium-niobium pressure tube material used in all other large CANDU-PHW units after units 1 and 2 of Pickering NGS A. The tooling developed for the pressure tube replacement program is described as well as the organization to undertake the program in an operating nuclear station. The retubing of units 1 and 2 at Pickering NGS A is nearing a successful completion and shows the benefits of being able to integrate the various skills required for this success. Pressure tube replacement in a CANDU-PHW reactor is equivalent to replacement of the reactor vessel in a LWR. The fact that this replacement can be done economically and with acceptable radiation dose to workers augurs well for the continued viability of the use of nuclear energy for the benefit of mankind. (author)

  13. MILA Antenna Control Unit Replacement Project

    Science.gov (United States)

    Bresette, Jeremy

    2007-01-01

    The Air to Ground Subsystem (AGS) Antenna Control Units at the MILA Ground Network Tracking Station are at end-of-life and are being replaced. AGS consists of two antennas at MILA (Quad-Helix and Teltrac). Software was taken from the existing Subsystem Controller and modified for the Antenna Control Unit (ACU). The software is capable of receiving and sending commands to and from the ACU. Moving the azimuth clockwise, counterclockwise, moving the elevation up or down, turning servo power on and off, and inputting azimuth and elevation angles are commands that the antenna can receive.

  14. Analysis of human protein replacement stable cell lines established using snoMEN-PR vector.

    Directory of Open Access Journals (Sweden)

    Motoharu Ono

    Full Text Available The study of the function of many human proteins is often hampered by technical limitations, such as cytotoxicity and phenotypes that result from overexpression of the protein of interest together with the endogenous version. Here we present the snoMEN (snoRNA Modulator of gene ExpressioN vector technology for generating stable cell lines where expression of the endogenous protein can be reduced and replaced by an exogenous protein, such as a fluorescent protein (FP-tagged version. SnoMEN are snoRNAs engineered to contain complementary sequences that can promote knock-down of targeted RNAs. We have established and characterised two such partial protein replacement human cell lines (snoMEN-PR. Quantitative mass spectrometry was used to analyse the specificity of knock-down and replacement at the protein level and also showed an increased pull-down efficiency of protein complexes containing exogenous, tagged proteins in the protein replacement cell lines, as compared with conventional co-expression strategies. The snoMEN approach facilitates the study of mammalian proteins, particularly those that have so far been difficult to investigate by exogenous expression and has wide applications in basic and applied gene-expression research.

  15. Trenchless Replacement of Buried Cable Lines

    Directory of Open Access Journals (Sweden)

    Hans-Joachim Bayer

    2007-01-01

    Full Text Available An enormous amount of underground electricity and telecommunication cables have been worn over the time with technical defects or need capacity increases. Thus, new lines need to be installed. In urban areas, even in smaller communities and in natural reserves, open trenching is difficult and often not permitted.In response, new patented methods of trenchless cable replacement using the HDD equipment have been developed by the TT Group. The new technology is called “Wash-over-cable-replacement” and applies specially designed drill heads, cutting around the old cable string in various configurations (completely closed, U-shape or S-shape embracing, depending to the coating type of the old cable. This special cable replacement drill head separates the cable from the surrounding adhesive soil or the sand bedding by creating a very small annular space around the cable thus enabling the pulling or dragging out of the old cable section between the start and the exit pit. After the old cable has been loosened from the surrounding soil by means of the wash over process and pulled out, the new cable can be smoothly pulled into the void using the drill rods and embedding the new cable in a rich bed of Bentonite.The wash-over drill heads are slim and have inner and outer nozzles for Bentonite and bits to handle roots, pebbles, gravel and the like. These drill heads perform very quickly (up to 3 meters per minute to effectively wash over existing cables without damaging the cable coating and prepare the ground for a fast new laying of a new cable in the existing line. Network owners also benefit from the fact that new geodetic or topographic surveys and documentations of the new cable are not necessary. Only the documents, remarks, technical codes and existing geodetic data need to be updated.The paper will outline the technological background and include several practical job examples.

  16. Embedded piezoelectrics for sensing and energy harvesting in total knee replacement units

    Science.gov (United States)

    Wilson, Brooke E.; Meneghini, Michael; Anton, Steven R.

    2015-04-01

    The knee replacement is the second most common orthopedic surgical intervention in the United States, but currently only 1 in 5 knee replacement patients are satisfied with their level of pain reduction one year after surgery. It is imperative to make the process of knee replacement surgery more objective by developing a data driven approach to ligamentous balance, which increases implant life. In this work, piezoelectric materials are considered for both sensing and energy harvesting applications in total knee replacement implants. This work aims to embed piezoelectric material in the polyethylene bearing of a knee replacement unit to act as self-powered sensors that will aid in the alignment and balance of the knee replacement by providing intraoperative feedback to the surgeon. Postoperatively, the piezoelectric sensors can monitor the structural health of the implant in order to perceive potential problems before they become bothersome to the patient. Specifically, this work will present on the use of finite element modeling coupled with uniaxial compression testing to prove that piezoelectric stacks can be utilized to harvest sufficient energy to power sensors needed for this application.

  17. Radiation control in the core shroud replacement project of Fukushima-Daiichi NPS Unit no.2

    International Nuclear Information System (INIS)

    Kokubun, Yasunori; Haraguchi, Kazuyuki; Yoshizawa, Yuji; Yamada, Yasuo

    2000-01-01

    In Fukushima-Daiichi NPS Unit no.2, the core shroud replacement was made following that of Unit no.3. This project involves replacement of wide-ranging equipment, with the project extending over a long period of time. This was expected to increase the dose equivalent of workers. Accordingly, various measures to lower the dose equivalent were planned and implemented. We outline radiation controls implemented during the project period. The shroud replacement project was a preventive maintenance project which consisted of replacing the core shroud and other internals with those less susceptible to stress corrosion cracking. Problems related to radiation control during the replacement project of Unit no.3 the year before last were summarized. We studied, planned, and implemented measures to be reflected in the project for Unit no.2. This was done to lower the dose equivalent as much as possible while paying due attention to safety and economy. For radiation control during the project for Unit no.2, experiments with Unit no.3 were fully exploited and any effective measures taken at that time were adopted in this project. Problems pointed out after that project with Unit no.3 resulted in new or improved measures being taken with Unit no.2. Measures taken over from the project with Unit no.3; a. Daily analysis of difference between expected and actual dose equivalents b. Dose reduction measures, chemical decontamination, temporary shield, flushing, etc.; New or improved measures; a. Dose reduction measures: Mechanical removal of radiation sources, strengthening of shield, etc.; b. Automatic remote control system; c. Use of new protective devices. With measures implemented as described above, the dose equivalent during shroud replacement of Unit no.2 was reduced by about 30% when compared with that (11.5 persons · Sv) in the case of Unit no.3. Implemented radiation controls will be checked and reviewed in future for reflection in projects with other units. (author)

  18. Seeking optimal renal replacement therapy delivery in intensive care units.

    Science.gov (United States)

    Kocjan, Marinka; Brunet, Fabrice P

    2010-01-01

    Globally, critical care environments within health care organizations strive to provide optimal quality renal replacement therapy (RRT), an artificial replacement for lost kidney function. Examination of RRT delivery model literature and a case study review of the multidisciplinary-mixed RRT delivery model utilized within a closed medical surgical intensive care unit illustrates the organizational and clinical management of specialized resource and multidisciplinary roles. The successful utilization of a specific RRT delivery model is dependent upon resource availability.

  19. Quad Cities Unit 2 Main Steam Line Acoustic Source Identification and Load Reduction

    International Nuclear Information System (INIS)

    DeBoo, Guy; Ramsden, Kevin; Gesior, Roman

    2006-01-01

    The Quad Cities Units 1 and 2 have a history of steam line vibration issues. The implementation of an Extended Power Up-rate resulted in significant increases in steam line vibration as well as acoustic loading of the steam dryers, which led to equipment failures and fatigue cracking of the dryers. This paper discusses the results of extensive data collection on the Quad Cities Unit 2 replacement dryer and the Main Steam Lines. This data was taken with the intent of identifying acoustic sources in the steam system. Review of the data confirmed that vortex shedding coupled column resonance in the relief and safety valve stub pipes were the principal sources of large magnitude acoustic loads in the main steam system. Modifications were developed in sub-scale testing to alter the acoustic properties of the valve standpipes and add acoustic damping to the system. The modifications developed and installed consisted of acoustic side branches that were attached to the Electromatic Relief Valve (ERV) and Main Steam Safety Valve (MSSV) attachment pipes. Subsequent post-modification testing was performed in plant to confirm the effectiveness of the modifications. The modifications have been demonstrated to reduce vibration loads at full Extended Power Up-rate (EPU) conditions to levels below those at Original Licensed Thermal Power (OLTP). (authors)

  20. Simulation based assembly and alignment process ability analysis for line replaceable units of the high power solid state laser facility

    International Nuclear Information System (INIS)

    Wang, Junfeng; Lu, Cong; Li, Shiqi

    2016-01-01

    Highlights: • Discrete event simulation is applied to analyze the assembly and alignment process ability of LRUs in SG-III facility. • The overall assembly and alignment process of LRUs with specific characteristics is described. • An extended-directed graph is proposed to express the assembly and alignment process of LRUs. • Different scenarios have been simulated to evaluate assembling process ability of LRUs and decision making is supported to ensure the construction millstone. - Abstract: Line replaceable units (LRUs) are important components of the very large high power solid state laser facilities. The assembly and alignment process ability of LRUs will impact the construction milestone of facilities. This paper describes the use of discrete event simulation method for assembly and alignment process analysis of LRUs in such facilities. The overall assembly and alignment process for LRUs is presented based on the layout of the optics assembly laboratory and the process characteristics are analyzed. An extended-directed graph is proposed to express the assembly and alignment process of LRUs. Taking the LRUs of disk amplifier system in Shen Guang-III (SG-III) facility as the example, some process simulation models are built based on the Quest simulation platform. The constraints, such as duration, equipment, technician and part supply, are considered in the simulation models. Different simulation scenarios have been carried out to evaluate the assembling process ability of LRUs. The simulation method can provide a valuable decision making and process optimization tool for the optics assembly laboratory layout and the process working out of such facilities.

  1. Simulation based assembly and alignment process ability analysis for line replaceable units of the high power solid state laser facility

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Junfeng; Lu, Cong; Li, Shiqi, E-mail: sqli@hust.edu.cn

    2016-11-15

    Highlights: • Discrete event simulation is applied to analyze the assembly and alignment process ability of LRUs in SG-III facility. • The overall assembly and alignment process of LRUs with specific characteristics is described. • An extended-directed graph is proposed to express the assembly and alignment process of LRUs. • Different scenarios have been simulated to evaluate assembling process ability of LRUs and decision making is supported to ensure the construction millstone. - Abstract: Line replaceable units (LRUs) are important components of the very large high power solid state laser facilities. The assembly and alignment process ability of LRUs will impact the construction milestone of facilities. This paper describes the use of discrete event simulation method for assembly and alignment process analysis of LRUs in such facilities. The overall assembly and alignment process for LRUs is presented based on the layout of the optics assembly laboratory and the process characteristics are analyzed. An extended-directed graph is proposed to express the assembly and alignment process of LRUs. Taking the LRUs of disk amplifier system in Shen Guang-III (SG-III) facility as the example, some process simulation models are built based on the Quest simulation platform. The constraints, such as duration, equipment, technician and part supply, are considered in the simulation models. Different simulation scenarios have been carried out to evaluate the assembling process ability of LRUs. The simulation method can provide a valuable decision making and process optimization tool for the optics assembly laboratory layout and the process working out of such facilities.

  2. 222-S radioactive liquid waste line replacement and 219-S secondary containment upgrade, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    The U.S. Department of Energy (DOE) is proposing to: (1) replace the 222-S Laboratory (222-S) radioactive liquid waste drain lines to the 219-S Waste Handling Facility (219-S); (2) upgrade 219-S by replacing or upgrading the waste storage tanks and providing secondary containment and seismic restraints to the concrete cells which house the tanks; and (3) replace the transfer lines from 219-S to the 241-SY Tank Farm. This environmental assessment (EA) has been prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations [CFR] 1500-1508), and the DOE Implementing Procedures for NEPA (10 CFR 1021). 222-S is used to perform analytical services on radioactive samples in support of the Tank Waste Remediation System and Hanford Site environmental restoration programs. Activities conducted at 222-S include decontamination of analytical processing and support equipment and disposal of nonarchived radioactive samples. These activities generate low-level liquid mixed waste. The liquid mixed waste is drained through pipelines in the 222-S service tunnels and underground concrete encasements, to two of three tanks in 219-S, where it is accumulated. 219-S is a treatment, storage, and/or disposal (TSD) unit, and is therefore required to meet Washington Administrative Code (WAC) 173-303, Dangerous Waste Regulations, and the associated requirements for secondary containment and leak detection. The service tunnels are periodically inspected by workers and decontaminated as necessary to maintain as low as reasonably achievable (ALARA) radiation levels. Although no contamination is reaching the environment from the service tunnels, the risk of worker exposure is present and could increase. 222-S is expected to remain in use for at least the next 30 years to serve the Hanford Site environmental cleanup mission

  3. Replacement of fluid-filter elements without interruption of flow

    Science.gov (United States)

    Kotler, R. A.; Ward, J. B.

    1969-01-01

    Gatling-type filter assembly, preloaded with several filter elements enables filter replacement without breaking into the operative fluid system. When the filter element becomes contaminated, a unit inner subassembly is rotated 60 degrees to position a clean filter in the line.

  4. Radionuclide scanning after total knee replacement: correlation with pain and radiolucent lines. A prospective study

    DEFF Research Database (Denmark)

    Duus, B R; Boeckstyns, M; Kjaer, L

    1987-01-01

    The authors examined the relationships among Tc-99m radionuclide bone scan findings, pain, and radiolucent lines in 35 postsurgical knees. Our prospective study included bone scans, as well as radiographic and clinical examination three, seven, and 12 months after knee replacement surgery in 35...... and nonpainful knees, and the degree of isotope uptake did not correlate with the development of radiolucent lines around the prosthetic components....

  5. Prevalence of Total Hip and Knee Replacement in the United States.

    Science.gov (United States)

    Maradit Kremers, Hilal; Larson, Dirk R; Crowson, Cynthia S; Kremers, Walter K; Washington, Raynard E; Steiner, Claudia A; Jiranek, William A; Berry, Daniel J

    2015-09-02

    Descriptive epidemiology of total joint replacement procedures is limited to annual procedure volumes (incidence). The prevalence of the growing number of individuals living with a total hip or total knee replacement is currently unknown. Our objective was to estimate the prevalence of total hip and total knee replacement in the United States. Prevalence was estimated using the counting method by combining historical incidence data from the National Hospital Discharge Survey and the Healthcare Cost and Utilization Project (HCUP) State Inpatient Databases from 1969 to 2010 with general population census and mortality counts. We accounted for relative differences in mortality rates between those who have had total hip or knee replacement and the general population. The 2010 prevalence of total hip and total knee replacement in the total U.S. population was 0.83% and 1.52%, respectively. Prevalence was higher among women than among men and increased with age, reaching 5.26% for total hip replacement and 10.38% for total knee replacement at eighty years. These estimates corresponded to 2.5 million individuals (1.4 million women and 1.1 million men) with total hip replacement and 4.7 million individuals (3.0 million women and 1.7 million men) with total knee replacement in 2010. Secular trends indicated a substantial rise in prevalence over time and a shift to younger ages. Around 7 million Americans are living with a hip or knee replacement, and consequently, in most cases, are mobile, despite advanced arthritis. These numbers underscore the substantial public health impact of total hip and knee arthroplasties. Copyright © 2015 by The Journal of Bone and Joint Surgery, Incorporated.

  6. Steam-generator replacement sets new marks

    International Nuclear Information System (INIS)

    Beck, R.L.

    1995-01-01

    This article describes how, in one of the most successful steam-generator replacement experiences at PWRs worldwide, the V C Summer retrofit exceeded plant goals for critical-path duration, radiation, exposure, and radwaste generation. Intensive planning and teamwork, combined with the firm support of station management and the use of mockups to prepare the work crews for activity in a radiological environment, were key factors in the record performance achieved by South Carolina Electric and Gas Co (SCE and G) in replacing three steam generators at V C Summer nuclear station. The 97-day, two-hour breaker-to-breaker replacement outage -- including an eight-day delay for repair of leak in a small-bore seal-injection line of a reactor coolant pump (unrelated to the replacement activities) -- surpassed the project goal by over one day. Moreover, the outage was only 13 hours shy of the world record held by Virginia Power Co's North Anna Unit 1

  7. A dented LH2 recirculation line is removed from Discovery

    Science.gov (United States)

    1999-01-01

    In the Payload Changeout Room, Launch Pad 39B, United Space Alliance and NASA workers look at the replacement main propulsion system liquid hydrogen recirculation line (left) to be installed in Shuttle Discovery's aft compartment. At right is the dented line that has been removed. The 12-inch-long dent was discovered during routine aft compartment inspections Tuesday, Dec. 7. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. The line is being replaced and managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.

  8. A study on the optimal replacement periods of digital control computer's components of Wolsung nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Mok, Jin Il; Seong, Poong Hyun

    1993-01-01

    Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Even a trip of a single nuclear power plant (NPP) causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this paper we investigated the optimal replacement periods of the control computer's components of Wolsung nuclear power plant Unit 1. We first derived mathematical models of optimal replacement periods to the digital control computer's components of Wolsung NPP Unit 1 and calculated the optimal replacement periods analytically. We compared the periods with the replacement periods currently used at Wolsung NPP Unit 1. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained and those used in the field show a little difference. (Author)

  9. Reactor Core Internals Replacement of Ikata Units 1 and 2

    International Nuclear Information System (INIS)

    Ikeda, K.; Ishikawa, T.; Miyoshi, T.; Takagi, T.

    2012-01-01

    This paper presents an overview of the reactor core internals replacement project carried out at the Ikata Nuclear Power Station in Japan, which was the first of its kind among PWRs in the world. Failure of baffle former bolts was first reported in 1989 at Bugey 2 in France. Since then, similar incidents have been reported in Belgium and in the U.S., but not in Japan. However, the possibility of these bolts failing in Japanese plants cannot be denied in the future as operating hours increase. Ageing degradation mechanisms for the reactor core internals include irradiation-assisted stress corrosion cracking of baffle former bolts and mechanical wear of control rod guide cards. Two different approaches can be taken to address these ageing issues: to inspect and repair whenever a problem is found; and to replace the entire core internals with those of a new design having advanced features to prevent ageing degradation problems. The choice of our company was the latter. This paper explains the reasons for the choice and summarizes the replacement project activities at Ikata Units 1 and 2 as well as the improvements incorporated in the new design. (author)

  10. Replacement energy costs for nuclear electricity-generating units in the United States: 1997--2001. Volume 4

    International Nuclear Information System (INIS)

    VanKuiken, J.C.; Guziel, K.A.; Tompkins, M.M.; Buehring, W.A.

    1997-09-01

    This report updates previous estimates of replacement energy costs for potential short-term shutdowns of 109 US nuclear electricity-generating units. This information was developed to assist the US Nuclear Regulatory Commission (NRC) in its regulatory impact analyses, specifically those that examine the impacts of proposed regulations requiring retrofitting of or safety modifications to nuclear reactors. Such actions might necessitate shutdowns of nuclear power plants while these changes are being implemented. The change in energy cost represents one factor that the NRC must consider when deciding to require a particular modification. Cost estimates were derived from probabilistic production cost simulations of pooled utility system operations. Factors affecting replacement energy costs, such as random unit failures, maintenance and refueling requirements, and load variations, are treated in the analysis. This report describes an abbreviated analytical approach as it was adopted to update the cost estimates published in NUREG/CR-4012, Vol. 3. The updates were made to extend the time frame of cost estimates and to account for recent changes in utility system conditions, such as change in fuel prices, construction and retirement schedules, and system demand projects

  11. Replacement of the moderator cell unit of JRR-3's cold neutron source facility

    International Nuclear Information System (INIS)

    Hazawa, Tomoya; Nagahori, Kazuhisa; Kusunoki, Tsuyoshi

    2006-10-01

    The moderator cell of the JRR-3's cold neutron source (CNS) facility, converts thermal neutrons into cold neutrons by passing through liquid cold hydrogen. The cold neutrons are used for material and life science research such as the neutron scattering. The CNS has been operated since the start of JRR-3's in 1990. The moderator cell containing liquid hydrogen is made of stainless steel. The material irradiation lifetime is limited to 7 years due to irradiation brittleness. The first replacement was done by using a spare part made in France. This replacement work of 2006 was carried out by using the domestic moderator cell unit. The following technologies were developed for the moderator cell unit production. 1) Technical development of black treatment on moderator cell surface to increase radiation heat. 2) Development of bending technology of concentric triple tubes consisting from inside tube, Outside tube and Vacuum insulation tube. 3) Development of manufacturing technique of the moderator cell with complicated shapes. According to detail planed work procedures, replacement work was carried out. As results, the working days were reduced to 80% of old ones. The radiation dose was also reduced due to reduction of working days. It was verified by measurement of neutrons characteristics that the replaced moderator cell has the same performance as that of the old moderator cell. The domestic manufacturing of the moderator cell was succeeded. As results, the replacement cost was reduced by development of domestic production technology. (author)

  12. Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement

    International Nuclear Information System (INIS)

    DiCello, D.C.; Odell, A.D.; Jackson, T.J.

    1995-01-01

    Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished, and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific (μCi/cm 2 ) of Co-60 and Zn-65 were analyzed

  13. Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement

    Energy Technology Data Exchange (ETDEWEB)

    DiCello, D.C.; Odell, A.D.; Jackson, T.J. [PECO Energy Co., Delta, PA (United States)

    1995-03-01

    Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished, and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific ({mu}Ci/cm{sup 2}) of Co-60 and Zn-65 were analyzed.

  14. Impact of the economic downturn on total joint replacement demand in the United States: updated projections to 2021.

    Science.gov (United States)

    Kurtz, Steven M; Ong, Kevin L; Lau, Edmund; Bozic, Kevin J

    2014-04-16

    Few studies have explored the role of the National Health Expenditure and macroeconomics on the utilization of total joint replacement. The economic downturn has raised questions about the sustainability of growth for total joint replacement in the future. Previous projections of total joint replacement demand in the United States were based on data up to 2003 using a statistical methodology that neglected macroeconomic factors, such as the National Health Expenditure. Data from the Nationwide Inpatient Sample (1993 to 2010) were used with United States Census and National Health Expenditure data to quantify historical trends in total joint replacement rates, including the two economic downturns in the 2000s. Primary and revision hip and knee arthroplasty were identified using codes from the International Classification of Diseases, Ninth Revision, Clinical Modification. Projections in total joint replacement were estimated using a regression model incorporating the growth in population and rate of arthroplasties from 1993 to 2010 as a function of age, sex, race, and census region using the National Health Expenditure as the independent variable. The regression model was used in conjunction with government projections of National Health Expenditure from 2011 to 2021 to estimate future arthroplasty rates in subpopulations of the United States and to derive national estimates. The growth trend for the incidence of joint arthroplasty, for the overall United States population as well as for the United States workforce, was insensitive to economic downturns. From 2009 to 2010, the total number of procedures increased by 6.0% for primary total hip arthroplasty, 6.1% for primary total knee arthroplasty, 10.8% for revision total hip arthroplasty, and 13.5% for revision total knee arthroplasty. The National Health Expenditure model projections for primary hip replacement in 2020 were higher than a previously projected model, whereas the current model estimates for total

  15. Replacement of steam generators at arkansas nuclear one, unit-2 (ano-2)

    International Nuclear Information System (INIS)

    Wilson, R.M.; Buford, A.

    2001-01-01

    The Arkansas Nuclear One, Unit-2 steam generators, originally supplied by Combustion Engineering, began commercial operation in 1980 producing a gross electrical output of 958 MW. After several years of successful operation, the owner decided that the tube degradation rates of the original steam generators were too high for the plant to meet the performance requirements for the full 40-year license period. The contract to supply replacement steam generators (RSGs) was awarded to Westinghouse Electric Company in 1996. Installation of these RSGs took place in the last months of 2000. This paper compares the design features of the original and re-placement steam generators with emphasis on design and reliability enhancements achieved. (author)

  16. Conducting Qualitative Data Analysis: Reading Line-by-Line, but Analyzing by Meaningful Qualitative Units

    Science.gov (United States)

    Chenail, Ronald J.

    2012-01-01

    In the first of a series of "how-to" essays on conducting qualitative data analysis, Ron Chenail points out the challenges of determining units to analyze qualitatively when dealing with text. He acknowledges that although we may read a document word-by-word or line-by-line, we need to adjust our focus when processing the text for purposes of…

  17. Optimal replacement and inspection periods of safety and control boards in Wolsung nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Mok, Jin Il

    1993-02-01

    In nuclear power plants, the safety and control systems are important for operating and maintaining safety of nuclear power plants. Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Since the start of first commercial operation of Kori nuclear power plant (NPP) unit 1, the trips caused by instrument and control systems account for 28% of total trips of NPPs in Korea. Even a single trip of a nuclear power plant causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this work we investigated the optimal replacement periods of the digital control computer's (DCC) and the programmable digital comparator's (PDC) electronic circuit boards of Wolsung nuclear power plant Unit 1. We first derived mathematical models which calculate optimal replacement periods for electronic circuit boards of digital control computer (DCC) and for those of the programmable digital comparator (PDC) in Wolsung NPP unit 1. And we analytically obtained the optimal replacement periods of electronic circuit boards by using these models. We compared these periods with the replacement periods currently used at Wolsung NPP Unit. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained for the electronic circuit boards of DCC and those used in the field shown small difference : the optimal replacement periods analytically obtained for the electronic circuit boards of PDC are shorter than those used in the field in general. The engineered safeguards of Wolsung nuclear power plant unit 1 contains redundant systems of 2-out-of-3 logic which are not operating under normal conditions but they are called

  18. Optimal selection of Orbital Replacement Unit on-orbit spares - A Space Station system availability model

    Science.gov (United States)

    Schwaab, Douglas G.

    1991-01-01

    A mathematical programing model is presented to optimize the selection of Orbital Replacement Unit on-orbit spares for the Space Station. The model maximizes system availability under the constraints of logistics resupply-cargo weight and volume allocations.

  19. Nuclear reactor fuel replacement system

    International Nuclear Information System (INIS)

    Kayano, Hiroyuki; Joge, Toshio.

    1976-01-01

    Object: To permit the direction in which a fuel replacement unit is moving to be monitored by the operator. Structure: When a fuel replacement unit approaches an intermediate goal position preset in the path of movement, renewal of data display on a goal position indicator is made every time the goal position is changed. With this renewal, the prevailing direction of movement of the fuel replacement unit can be monitored by the operator. When the control of movement is initiated, the co-ordinates of the intermediate goal point A are displayed on a goal position indicator. When the replacement unit reaches point A, the co-ordinates of the next intermediate point B are displayed, and upon reaching point B the co-ordinates of the (last) goal point C are displayed. (Nakamura, S.)

  20. A stand-replacing fire history in upper montane forests of the southern Rocky Mountains

    Science.gov (United States)

    Margolis, E.Q.; Swetnam, T.W.; Allen, Craig D.

    2007-01-01

    Dendroecological techniques were applied to reconstruct stand-replacing fire history in upper montane forests in northern New Mexico and southern Colorado. Fourteen stand-replacing fires were dated to 8 unique fire years (1842–1901) using four lines of evidence at each of 12 sites within the upper Rio Grande Basin. The four lines of evidence were (i) quaking aspen (Populus tremuloides Michx.) inner-ring dates, (ii) fire-killed conifer bark-ring dates, (iii) tree-ring width changes or other morphological indicators of injury, and (iv) fire scars. The annual precision of dating allowed the identification of synchronous stand-replacing fire years among the sites, and co-occurrence with regional surface fire events previously reconstructed from a network of fire scar collections in lower elevation pine forests across the southwestern United States. Nearly all of the synchronous stand-replacing and surface fire years coincided with severe droughts, because climate variability created regional conditions where stand-replacing fires and surface fires burned across ecosystems. Reconstructed stand-replacing fires that predate substantial Anglo-American settlement in this region provide direct evidence that stand-replacing fires were a feature of high-elevation forests before extensive and intensive land-use practices (e.g., logging, railroad, and mining) began in the late 19th century.

  1. Semifragile Speech Watermarking Based on Least Significant Bit Replacement of Line Spectral Frequencies

    Directory of Open Access Journals (Sweden)

    Mohammad Ali Nematollahi

    2017-01-01

    Full Text Available There are various techniques for speech watermarking based on modifying the linear prediction coefficients (LPCs; however, the estimated and modified LPCs vary from each other even without attacks. Because line spectral frequency (LSF has less sensitivity to watermarking than LPC, watermark bits are embedded into the maximum number of LSFs by applying the least significant bit replacement (LSBR method. To reduce the differences between estimated and modified LPCs, a checking loop is added to minimize the watermark extraction error. Experimental results show that the proposed semifragile speech watermarking method can provide high imperceptibility and that any manipulation of the watermark signal destroys the watermark bits since manipulation changes it to a random stream of bits.

  2. CANDU-PHW fuel channel replacement experience

    International Nuclear Information System (INIS)

    Dunn, J.T.; Kakaria, B.K.

    1982-09-01

    One of the main characteristics of the CANDU pressurized heavy water reactor is the use of pressure tubes rather than one large pressure vessel to contain the fuel and coolant. This provides an inherent design capability to permit their replacement in an expeditious manner, without seriously affecting the high capacity factors of the reactor units. Of th eight Ontario Hydro commercial nuclear generating units, the lifetime performance places seven of them (including two that have had some of their fuel channels replaced), in the top ten positions in the world's large nuclear-electric unit performance ranking. Pressure tube cracks in the rolled joint region have resulted in 70 fuel channels being replaced in three reactor units, the latest being at the Bruce Nuclear Generating Station 'A', Unit 2 in February 1982. The rolled joint design and rolling procedures have been modified to eliminate this problem on CANDU units subsequent to Bruce 'A'. This paper describes the CANDU pressure tube performance history and expectations, and the tooling and procedures used to carry out the fuel channel replacement

  3. An analysis of unit tests of a flight software product line

    NARCIS (Netherlands)

    Ganesan, D.; Lindvall, M.; McComas, D.; Bartholomew, M.; Slegel, S.; Medina, B.; Krikhaar, R.; Verhoef, C.; Dharmalingam, G.; Montgomery, L.P.

    2013-01-01

    This paper presents an analysis of the unit testing approach developed and used by the Core Flight Software System (CFS) product line team at the NASA Goddard Space Flight Center (GSFC). The goal of the analysis is to understand, review, and recommend strategies for improving the CFS' existing unit

  4. An alternative to conventional babbitt metal-lined generator pads

    Energy Technology Data Exchange (ETDEWEB)

    Puuska, H. [Imatra Hydroelectric Power Plant (Finland)

    1996-08-01

    The generator refurbishment of the Imatra Hydroelectric Power Plant Unit 1 in Finland is described. The generator work called for installation of a new cooling system for the generator thrust bearing. The considerations leading to the decision to replace the conventional babbitt metal-lined pads with elastic metal-plastic coated thrust bearing pads and the installation of the new pads are outlined in the article. Results of the trial run are summarized; the end temperature of the unit was more than 20C lower than for units equipped with conventional babbitted bearings.

  5. Replacement of the control and instrumentation system with the microprocessor based systems in Japanese PWR plants

    International Nuclear Information System (INIS)

    Hayashi, N.

    1998-01-01

    In Ohi Units 3 and 4, Ikata Unit 3, and Genkai Units 3 and 4, the latest of PWR plants now under operation in Japan, the reactor control system and turbine control system employ the microprocessor base digital control systems with a view to improving reliability, operability and maintainability. In the next stage plants, another application of such digital system is also planned for the instrumentation rack for the reactor protection system for further improvement. On the other hand, in Mihama Unit 1, the first of domestic PWR plants, and later plants except for the latest 5 plants, analog control systems are employed for the instrumentation racks. For the analog control systems of these plants, FOXBORO H-Line instruments, equivalent domestic box type instruments or WH7300 Series card type instruments were initially employed, and later replaced with domestic card type control systems after 10-15 year operation. However, 8-12 years have passed since these replacements, so the 15th year generally quoted as an interval for replacing C and I systems is near at hand. This is the time to consider next replacement. This replacement will be based on the latest digital technology. However, it is not practical way for the existing plants to apply the same integrated digital C and I system configuration for the next stage plants, because it requires the drastic change of the C and I system configuration and significant cost-up. Therefore, we must investigate the optimum digital C and I system configuration for the existing system. (author)

  6. On-line PWR RHR pump performance testing following motor and impeller replacement

    International Nuclear Information System (INIS)

    DiMarzo, J.T.

    1996-01-01

    On-line maintenance and replacement of safety-related pumps requires the performance of an inservice test to determine and confirm the operational readiness of the pumps. In 1995, major maintenance was performed on two Pressurized Water Reactor (PWR) Residual Heat Removal (RHR) Pumps. A refurbished spare motor was overhauled with a new mechanical seal, new motor bearings and equipped with pump's 'B' impeller. The spare was installed into the 'B' train. The motor had never been run in the system before. A pump performance test was developed to verify it's operational readiness and determine the in-situ pump performance curve. Since the unit was operating, emphasis was placed on conducting a highly accurate pump performance test that would ensure that it satisfied the NSSS vendors accident analysis minimum acceptance curve. The design of the RHR System allowed testing of one train while the other was aligned for normal operation. A test flow path was established from the Refueling Water Storage Tank (RWST) through the pump (under test) and back to the RWST. This allowed staff to conduct a full flow range pump performance test. Each train was analyzed and an expression developed that included an error vector term for the TDH (ft), pressure (psig), and flow rate (gpm) using the variance error vector methodology. This method allowed the engineers to select a test instrumentation system that would yield accurate readings and minimal measurement errors, for data taken in the measurement of TDH (P,Q) versus Pump Flow Rate (Q). Test results for the 'B' Train showed performance well in excess of the minimum required. The motor that was originally in the 'B' train was similarly overhauled and equipped with 'A' pump's original impeller, re-installed in the 'A' train, and tested. Analysis of the 'A' train results indicate that the RHR pump's performance was also well in excess of the vendors requirements

  7. On-line PWR RHR pump performance testing following motor and impeller replacement

    Energy Technology Data Exchange (ETDEWEB)

    DiMarzo, J.T.

    1996-12-01

    On-line maintenance and replacement of safety-related pumps requires the performance of an inservice test to determine and confirm the operational readiness of the pumps. In 1995, major maintenance was performed on two Pressurized Water Reactor (PWR) Residual Heat Removal (RHR) Pumps. A refurbished spare motor was overhauled with a new mechanical seal, new motor bearings and equipped with pump`s `B` impeller. The spare was installed into the `B` train. The motor had never been run in the system before. A pump performance test was developed to verify it`s operational readiness and determine the in-situ pump performance curve. Since the unit was operating, emphasis was placed on conducting a highly accurate pump performance test that would ensure that it satisfied the NSSS vendors accident analysis minimum acceptance curve. The design of the RHR System allowed testing of one train while the other was aligned for normal operation. A test flow path was established from the Refueling Water Storage Tank (RWST) through the pump (under test) and back to the RWST. This allowed staff to conduct a full flow range pump performance test. Each train was analyzed and an expression developed that included an error vector term for the TDH (ft), pressure (psig), and flow rate (gpm) using the variance error vector methodology. This method allowed the engineers to select a test instrumentation system that would yield accurate readings and minimal measurement errors, for data taken in the measurement of TDH (P,Q) versus Pump Flow Rate (Q). Test results for the `B` Train showed performance well in excess of the minimum required. The motor that was originally in the `B` train was similarly overhauled and equipped with `A` pump`s original impeller, re-installed in the `A` train, and tested. Analysis of the `A` train results indicate that the RHR pump`s performance was also well in excess of the vendors requirements.

  8. Safety measures for the main control board replacement project at Ikata units 1 and 2

    International Nuclear Information System (INIS)

    Hashimoto, Nozomu; Tada, Kenji

    2013-01-01

    When Units 1 and 2 of the Ikata Power Station underwent replacement of their main control boards, control cabinets, and associated equipment, it was necessary to remove all the control boards, cabinets, and cables from the control building including from the main control room. This meant the loss of operation and monitoring functions in the main control room and functions of control cabinets. To maintain the operation and monitoring functions required under plant shutdown conditions, temporary operation and monitoring equipment (i.e., temporary main control board) was installed in the temporary main control room. The advance preparations included a trial switching from the permanent to the temporary main control board to identify and address potential problems in advance. When the replacement work was underway, a work schedule sheet posted in the temporary and the permanent control rooms was used to prevent human errors caused by operators’ recognition errors. Monitoring and control signals were switched from the old boards to the temporary boards and from the temporary boards to the new boards at appropriate timings to ensure plant safety during the replacement operation. (author)

  9. The insitu lining of cooling water piping

    International Nuclear Information System (INIS)

    Vaughan, W.K.; Oxner, K.B.

    1994-01-01

    The internal corrosion of cooling water piping as well as other industrial piping is becoming an increasing problem to system reliability. There are various alternatives being offered as solutions to the problem including water treatment, coatings, and piping replacement. The in-place lining of these pipes is becoming increasingly popular as a cost-effective method to control corrosion. A cured-in-place plastic composite system can be installed with minimal dismantling or excavation. This paper will examine case histories of the installations of this lining system in power plants at three (3) locations in the United States and one in France. It will also summarize testing that has been performed on the lining system and tests that are currently being performed

  10. B Plant process piping replacement feasibility study

    International Nuclear Information System (INIS)

    Howden, G.F.

    1996-01-01

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace

  11. Age replacement models: A summary with new perspectives and methods

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Al-Khalifa, Khalifa N.; Magid Hamouda, Abdel; Nakagawa, Toshio

    2017-01-01

    Age replacement models are fundamental to maintenance theory. This paper summarizes our new perspectives and hods in age replacement models: First, we optimize the expected cost rate for a required availability level and vice versa. Second, an asymptotic model with simple calculation is proposed by using the cumulative hazard function skillfully. Third, we challenge the established theory such that preventive replacement should be non-random and only corrective replacement should be made for the unit with exponential failure. Fourth, three replacement policies with random working cycles are discussed, which are called overtime replacement, replacement first, and replacement last, respectively. Fifth, the policies of replacement first and last are formulated with general models. Sixth, age replacement is modified for the situation when the economical life cycle of the unit is a random variable with probability distribution. Finally, models of a parallel system with constant and random number of units are taken into considerations. The models of expected cost rates are obtained and optimal replacement times to minimize them are discussed analytically and computed numerically. Further studies and potential applications are also indicated at the end of discussions of the above models. - Highlights: • Optimization of cost rate for availability level is discussed and vice versa. • Asymptotic and random replacement models are discussed. • Overtime replacement, replacement first and replacement last are surveyed. • Replacement policy with random life cycle is given. • A parallel system with random number of units is modeled.

  12. Four-unit fixed dental prostheses replacing the maxillary incisors supported by two narrow-diameter implants - a five-year case series.

    Science.gov (United States)

    Moráguez, Osvaldo; Vailati, Francesca; Grütter, Linda; Sailer, Irena; Belser, Urs C

    2017-07-01

    (1) To determine the survival rate of 10 four-unit fixed dental prostheses (FDPs) replacing the four maxillary incisors, supported by 20 narrow-diameter implants (NDIs), (2) to assess the incidence of mechanical and biological complications, and (3) to evaluate bone level changes longitudinally after final FDP insertion. Ten patients (six women, four men), mean age 49.4 ± 12.6 years, were treated with a four-unit anterior maxillary FDP (six screw-retained; four cemented). Biological parameters, eventual technical complications, radiographic measurements, and study casts were assessed at 1 (baseline), 3, and 5 years after implant placement. A multilevel logistic regression test was performed on clinical parameters and bone level changes (significance level P four-unit FDP to replace the four missing maxillary incisors may be considered a predictable treatment modality. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  13. Efficient algorithm for generating spectra using line-by-line methods

    International Nuclear Information System (INIS)

    Sonnad, V.; Iglesias, C.A.

    2011-01-01

    A method is presented for efficient generation of spectra using line-by-line approaches. The only approximation is replacing the line shape function with an interpolation procedure, which makes the method independent of the line profile functional form. The resulting computational savings for large number of lines is proportional to the number of frequency points in the spectral range. Therefore, for large-scale problems the method can provide speedups of two orders of magnitude or more. A method was presented to generate line-by-line spectra efficiently. The first step was to replace the explicit calculation of the profile by the Newton divided-differences interpolating polynomial. The second step is to accumulate the lines effectively reducing their number to the number of frequency points. The final step is recognizing the resulting expression as a convolution and amenable to FFT methods. The reduction in computational effort for a configuration-to-configuration transition array with large number of lines is proportional to the number of frequency points. The method involves no approximations except for replacing the explicit profile evaluation by interpolation. Specifically, the line accumulation and convolution are exact given the interpolation procedure. Furthermore, the interpolation makes the method independent of the line profile functional form contrary to other schemes using FFT methods to generate line-by-line spectra but relying on the analytic form of the profile Fourier transform. Finally, the method relies on a uniform frequency mesh. For non-uniform frequency meshes, however, the method can be applied by using a suitable temporary uniform mesh and the results interpolated onto the final mesh with little additional cost.

  14. Short- and Long-Term Lead Release after Partial Lead Service Line Replacements in a Metropolitan Water Distribution System.

    Science.gov (United States)

    Deshommes, Elise; Laroche, Laurent; Deveau, Dominique; Nour, Shokoufeh; Prévost, Michèle

    2017-09-05

    Thirty-three households were monitored in a full-scale water distribution system, to investigate the impact of recent (sampling over a period of 1-20 months. Point-of-entry filters were installed to capture sporadic release of particulate lead from the lead service lines (LSLs). Mean concentrations increased immediately after PLSLRs and erratic particulate lead spikes were observed over the 18 month post-PLSLR monitoring period. The mass of lead released during this time frame indicates the occurrence of galvanic corrosion and scale destabilization. System-wide, lead concentrations were however lower in households with PLSLRs as compared to those with no replacement, especially for old PLSLRs. Nonetheless, 61% of PLSLR samples still exceeded 10 μg/L, reflecting the importance of implementing full LSL replacement and efficient risk communication. Acute concentrations measured immediately after PLSLRs demonstrate the need for appropriate flushing procedures to prevent lead poisoning.

  15. Use of Six Sigma strategies to pull the line on central line-associated bloodstream infections in a neurotrauma intensive care unit.

    Science.gov (United States)

    Loftus, Kelli; Tilley, Terry; Hoffman, Jason; Bradburn, Eric; Harvey, Ellen

    2015-01-01

    The creation of a consistent culture of safety and quality in an intensive care unit is challenging. We applied the Six Sigma Define-Measure-Analyze-Improve-Control (DMAIC) model for quality improvement (QI) to develop a long-term solution to improve outcomes in a high-risk neurotrauma intensive care unit. We sought to reduce central line utilization as a cornerstone in preventing central line-associated bloodstream infections (CLABSIs). This study describes the successful application of the DMAIC model in the creation and implementation of evidence-based quality improvement designed to reduce CLABSIs to below national benchmarks.

  16. The dramatic increase in total knee replacement utilization rates in the United States cannot be fully explained by growth in population size and the obesity epidemic.

    Science.gov (United States)

    Losina, Elena; Thornhill, Thomas S; Rome, Benjamin N; Wright, John; Katz, Jeffrey N

    2012-02-01

    Total knee replacement utilization in the United States more than doubled from 1999 to 2008. Although the reasons for this increase have not been examined rigorously, some have attributed the increase to population growth and the obesity epidemic. Our goal was to investigate whether the rapid increase in total knee replacement use over the past decade can be sufficiently attributed to changes in these two factors. We used data from the Nationwide Inpatient Sample to estimate changes in total knee replacement utilization rates from 1999 to 2008, stratified by age (eighteen to forty-four years, forty-five to sixty-four years, and sixty-five years or older). We obtained data on obesity prevalence and U.S. population growth from federal sources. We compared the rate of change in total knee replacement utilization with the rates of population growth and change in obesity prevalence from 1999 to 2008. In 2008, 615,050 total knee replacements were performed in the United States adult population, 134% more than in 1999. During the same time period, the overall population size increased by 11%. While the population of forty-five to sixty-four-year-olds grew by 29%, the number of total knee replacements in this age group more than tripled. The number of obese and non-obese individuals in the United States increased by 23% and 4%, respectively. Assuming unchanged indications for total knee replacement among obese and non-obese individuals with knee osteoarthritis over the last decade, these changes fail to account for the 134% growth in total knee replacement use. Population growth and obesity cannot fully explain the rapid expansion of total knee replacements in the last decade, suggesting that other factors must also be involved. The disproportionate increase in total knee replacements among younger patients may be a result of a growing number of knee injuries and expanding indications for the procedure.

  17. Decreasing Postanesthesia Care Unit to Floor Transfer Times to Facilitate Short Stay Total Joint Replacements.

    Science.gov (United States)

    Sibia, Udai S; Grover, Jennifer; Turcotte, Justin J; Seanger, Michelle L; England, Kimberly A; King, Jennifer L; King, Paul J

    2018-04-01

    We describe a process for studying and improving baseline postanesthesia care unit (PACU)-to-floor transfer times after total joint replacements. Quality improvement project using lean methodology. Phase I of the investigational process involved collection of baseline data. Phase II involved developing targeted solutions to improve throughput. Phase III involved measured project sustainability. Phase I investigations revealed that patients spent an additional 62 minutes waiting in the PACU after being designated ready for transfer. Five to 16 telephone calls were needed between the PACU and the unit to facilitate each patient transfer. The most common reason for delay was unavailability of the unit nurse who was attending to another patient (58%). Phase II interventions resulted in transfer times decreasing to 13 minutes (79% reduction, P care at other institutions. Copyright © 2016 American Society of PeriAnesthesia Nurses. Published by Elsevier Inc. All rights reserved.

  18. New one cycle criteria for optimizing preventive replacement policies

    International Nuclear Information System (INIS)

    Hamidi, Maryam; Szidarovszky, Ferenc; Szidarovszky, Miklos

    2016-01-01

    Models are introduced and examined for the optimum scheduling of preventive replacements. The “replace first” and “replace last” models are known from the literature if the long term expected cost per unit time is minimized. We will first introduce the one cycle counterparts of these models when the expected costs per unit time in a single cycle is minimized. If the unit performs identical projects sequentially then the “replace next” model assumes that the preventive replacement is postponed until the ongoing project is finished. The termination time of this project is random which also depends on the scheduled time of the preventive replacement in contrary to the “replace first” and “replace last” models. The mathematical models are formulated and conditions are given for the existence of finite optima. Numerical examples and a simulation study illustrate the methodology and the numerical results show interesting comparisons of the different models. - Highlights: • The Single cycle age replacement model is extended incorporating repairable failures. • In order to avoid project interruption costs, three model variants are discussed. • Model variants are replace first, replace last and replace next. • In many cases analytic solutions are derived and illustrated by numerical examples. • The different model variants and their results are compared based on simulation studies.

  19. Nonparametric adaptive age replacement with a one-cycle criterion

    International Nuclear Information System (INIS)

    Coolen-Schrijner, P.; Coolen, F.P.A.

    2007-01-01

    Age replacement of technical units has received much attention in the reliability literature over the last four decades. Mostly, the failure time distribution for the units is assumed to be known, and minimal costs per unit of time is used as optimality criterion, where renewal reward theory simplifies the mathematics involved but requires the assumption that the same process and replacement strategy continues over a very large ('infinite') period of time. Recently, there has been increasing attention to adaptive strategies for age replacement, taking into account the information from the process. Although renewal reward theory can still be used to provide an intuitively and mathematically attractive optimality criterion, it is more logical to use minimal costs per unit of time over a single cycle as optimality criterion for adaptive age replacement. In this paper, we first show that in the classical age replacement setting, with known failure time distribution with increasing hazard rate, the one-cycle criterion leads to earlier replacement than the renewal reward criterion. Thereafter, we present adaptive age replacement with a one-cycle criterion within the nonparametric predictive inferential framework. We study the performance of this approach via simulations, which are also used for comparisons with the use of the renewal reward criterion within the same statistical framework

  20. Experience from replacement and check of thermocouples during reconstruction of in-reactor temperature measurements at Bohunice V-1 units 1 and 2

    International Nuclear Information System (INIS)

    Slanina, M.; Stanc, J.

    2001-01-01

    Replacement of thermocouples in the protection tube blocks was a key phase of the reconstruction of in-reactor temperature measurements at Bohunice V-1 with regard to the success, reliability and impact on safety of unit operation. The replacement consisted of reliable and safe withdrawal of 216 old thermocouples, their disposal and installation of new thermocouples into dry channels. In the material presented, this phase of reconstruction is described in details, with focus on the evaluation of replacement quality and check activities carried out at the new installed thermocouples. (Authors)

  1. Trends in Testosterone Replacement Therapy Use from 2003 to 2013 among Reproductive-Age Men in the United States.

    Science.gov (United States)

    Rao, Pravin Kumar; Boulet, Sheree L; Mehta, Akanksha; Hotaling, James; Eisenberg, Michael L; Honig, Stanton C; Warner, Lee; Kissin, Dmitry M; Nangia, Ajay K; Ross, Lawrence S

    2017-04-01

    Although testosterone replacement therapy use in the United States has increased dramatically in the last decade, to our knowledge trends in testosterone replacement therapy use among reproductive-age men have not been investigated. We assessed changes in testosterone replacement therapy use and practice patterns among 18 to 45-year-old American men from 2003 to 2013 and compared them to older men. This is a retrospective, cross-sectional analysis of men 18 to 45 and 56 to 64 years old who were enrolled in the Truven Health MarketScan® Commercial Claims Databases throughout each given calendar year from 2003 to 2013, including 5,094,868 men in 2013. Trends in the yearly rates of testosterone replacement therapy use were calculated using Poisson regression. Among testosterone replacement therapy users, the Cochran-Armitage test was used to assess temporal trends in age, formulation type, semen analysis and serum testosterone level testing during the 12 months preceding the documented use of testosterone replacement therapy. Between 2003 and 2013, there was a fourfold increase in the rate of testosterone use among 18 to 45-year-old men from 29.2/10,000 person-years to 118.1/10,000 person-years (p replacement therapy users, topical gel formulations were initially most used. Injection use then doubled between 2009 and 2012 (23.5% and 46.2%, respectively) and surpassed topical gel use in 2013. In men 56 to 64 years old there was a statistically significant threefold increase in testosterone replacement therapy use (p replacement therapy use increased fourfold in men 18 to 45 years old compared to threefold in older men. This younger age group should be a focus for future studies due to effects on fertility and unknown long-term sequelae. Copyright © 2017 American Urological Association Education and Research, Inc. Published by Elsevier Inc. All rights reserved.

  2. Sacrifice zones: the front lines of toxic chemical exposure in the United States

    National Research Council Canada - National Science Library

    Lerner, Steve

    2010-01-01

    ... States of America. Library of Congress Cataloging-in-Publication Data Lerner, Steve. Sacrifice zones: the front lines of toxic chemical exposure in the United States / Steve Lerner. p. cm. Includes bibliographical references and index. ISBN 978-0-262-01440-3 (hardcover : alk. paper) 1. Environmental toxicology- United States- Case studies. 2. Che...

  3. Improving compliance with hormonal replacement therapy in primary osteoporosis prevention

    DEFF Research Database (Denmark)

    Vestergaard, P; Hermann, A P; Gram, J

    1997-01-01

    To evaluate whether introduction of treatment alternatives would improve compliance with hormonal replacement therapy (HRT) as primary osteoporosis prevention in women not tolerating the first line osteoporosis prevention schedule.......To evaluate whether introduction of treatment alternatives would improve compliance with hormonal replacement therapy (HRT) as primary osteoporosis prevention in women not tolerating the first line osteoporosis prevention schedule....

  4. Peach Bottom Atomic Power Station, Units 2 and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 2 experienced 11 forced outages, 5 power reductions, and one major refueling outage which lasted about 3 months during which time the feedwater spargers were replaced. Net electrical power generated was 5,569,633 MWH with the generator on line 5,998 hrs. Unit 3 experienced 17 forced outages, 11 power reductions and 2 major outages. The first refueling outage began 12/24/77. Net electrical power generated was 6,049,644 MWH with the unit on line 6,829 hrs. Information is presented concerning operations, personnel exposures, radioactive releases, maintenance, and irradiated fuel examination

  5. Potential nutritional and economic effects of replacing juice with fruit in the diets of children in the United States.

    Science.gov (United States)

    Monsivais, Pablo; Rehm, Colin D

    2012-05-01

    To estimate the nutritional and economic effects of substituting whole fruit for juice in the diets of children in the United States. Secondary analyses using the 2001-2004 National Health and Nutrition Examination Survey and a national food prices database. Energy intakes, nutrient intakes, and diet costs were estimated before and after fruit juices were completely replaced with fruit in 3 models that emphasized fruits that were fresh, inexpensive, and widely consumed and in a fourth model that partially replaced juice with fruit, capping juice at recommended levels. A nationwide, representative sample of children in the United States. A total of 7023 children aged 3 to 18 years. Systematic complete or partial replacement of juice with fruit. Difference in energy intakes, nutrient intakes, and diet costs between observed and modeled diets. For children who consumed juice, replacement of all juice servings with fresh, whole fruit led to a projected reduction in dietary energy of 233 kJ/d (-2.6% difference [95% CI, -5.1% to -0.1%]), an increase in fiber of 4.3 g/d (31.1% difference [95% CI, 26.4%-35.9%]), and an increase in diet cost of $0.54/d (13.3% difference [95% CI, 8.8%-17.8%]). Substitution of juice with fresh fruit has the potential to reduce energy intake and improve the adequacy of fiber intake in children's diets. This would likely increase costs for schools, childcare providers, and families. These cost effects could be minimized by selecting processed fruits, but fewer nutritional gains would be achieved.

  6. Turbine casing bolts; a life assessment and bolt replacement strategy

    Energy Technology Data Exchange (ETDEWEB)

    Bulloch, J H [ESB, Power Generation, Dublin (Ireland)

    1999-12-31

    The present presentation describes a detailed study concerning the life assessment and replacement strategy of large turbine casing bolts in a 120 MW steam raising unit. After 122000 hours service, circa 1991/92, the Cr-Mo-V steel casing bolts, involving a total of 184 bolts, from two identical 120 MW units, termed Units 1 and 2, were examined to establish the extent of Reverse Temper Embrittlement, RTE, and creep damage suffered during service. The bolt replacement plans for the two units were as follows; Unit 1 bolts were completely replaced with new bolts while Unit 2 embrittled bolts were withdrawn from service and replaced with Non- Embrittled bolts from Unit 1; basically Unit 2 bolts were made up from a mixture of Unit 1 and 2 Non- Embrittled bolts which had been in service for 122000 hours. Remnant life assessments, concerning both embrittlement and creep damage aspects, were earned out on this series of easing bolts at service times 122000, 150000 and 200000 hours. These assessments involved the use of general embrittlement and creep damage laws which were empirically derived and concerned such parameters as microstructural grain size, bulk phosphorus content and accumulated service strain. (orig.) 7 refs.

  7. Turbine casing bolts; a life assessment and bolt replacement strategy

    Energy Technology Data Exchange (ETDEWEB)

    Bulloch, J.H. [ESB, Power Generation, Dublin (Ireland)

    1998-12-31

    The present presentation describes a detailed study concerning the life assessment and replacement strategy of large turbine casing bolts in a 120 MW steam raising unit. After 122000 hours service, circa 1991/92, the Cr-Mo-V steel casing bolts, involving a total of 184 bolts, from two identical 120 MW units, termed Units 1 and 2, were examined to establish the extent of Reverse Temper Embrittlement, RTE, and creep damage suffered during service. The bolt replacement plans for the two units were as follows; Unit 1 bolts were completely replaced with new bolts while Unit 2 embrittled bolts were withdrawn from service and replaced with Non- Embrittled bolts from Unit 1; basically Unit 2 bolts were made up from a mixture of Unit 1 and 2 Non- Embrittled bolts which had been in service for 122000 hours. Remnant life assessments, concerning both embrittlement and creep damage aspects, were earned out on this series of easing bolts at service times 122000, 150000 and 200000 hours. These assessments involved the use of general embrittlement and creep damage laws which were empirically derived and concerned such parameters as microstructural grain size, bulk phosphorus content and accumulated service strain. (orig.) 7 refs.

  8. Steam generator replacement at Bruce A: approach, results, and lessons learned

    International Nuclear Information System (INIS)

    Tomkiewicz, W.; Savage, B.; Smith, J.

    2008-01-01

    Steam Generator Replacement is now complete in Bruce A Units 1 and 2. In each reactor, eight steam generators were replaced; these were the first CANDU steam generator replacements performed anywhere in the world. The plans for replacement were developed in 2004 and 2005, and were summarized in an earlier paper for the CNS Conference held in November, 2006. The present paper briefly summarizes the methodologies and special processes used such as metrology, cutting and welding and heavy lifting. The paper provides an update since the earlier report and focuses on the project achievements to date, such as: - A combination of engineered methodology, laser metrology and precise remote machining led to accurate first time fit-ups of each new replacement steam generator and steam drums - Lessons learned in the first unit led to schedule improvements in the second unit - Dose received was lowest recorded for any steam generator replacement project. The experience gained and lessons learned from Units 1 and 2 will be valuable in planning and executing future replacement steam generator projects. A video was presented

  9. Scheduling Additional Train Unit Services on Rail Transit Lines

    OpenAIRE

    Zhibin Jiang; Yuyan Tan; Özgür Yalçınkaya

    2014-01-01

    This paper deals with the problem of scheduling additional train unit (TU) services in a double parallel rail transit line, and a mixed integer programming (MIP) model is formulated for integration strategies of new trains connected by TUs with the objective of obtaining higher frequencies in some special sections and special time periods due to mass passenger volumes. We took timetable scheduling and TUs scheduling as an integrated optimization model with two objectives: minimizing travel ti...

  10. Enhancing Information Usefulness by Line Managers’ Involvement in Cross-Unit Activities

    DEFF Research Database (Denmark)

    Foss, Kirsten; Rodgers, Waymond

    2011-01-01

    Organization and management scholars have long advocated that efficient use of information is critical for firms to compete successfully in the modern marketplace. This study examines whether the use of managerial cross-unit involvement in an organization enhances managers’ propensity to use useful...... information provided by a functionally related unit in the organization. Senior line managers in a major global bank participated in our study in which they provided information related to their information processing and assessments of the usefulness of corporate audit information. We analyse the effect...

  11. Optimal inspection and replacement periods of the safety system in Wolsung Nuclear Power Plant Unit 1 with an optimized cost perspective

    International Nuclear Information System (INIS)

    Jinil Mok; Poong Hyun Seong

    1996-01-01

    In this work, a model for determining the optimal inspection and replacement periods of the safety system in Wolsung Nuclear Power Plant Unit 1 is developed, which is to minimize economic loss caused by inadvertent trip and the system failure. This model uses cost benefit analysis method and the part for optimal inspection period considers the human error. The model is based on three factors as follows: (i) The cumulative failure distribution function of the safety system, (ii) The probability that the safety system does not operate due to failure of the system or human error when the safety system is needed at an emergency condition and (iii) The average probability that the reactor is tripped due to the failure of system components or human error. The model then is applied to evaluate the safety system in Wolsung Nuclear Power Plant Unit 1. The optimal replacement periods which are calculated with proposed model differ from those used in Wolsung NPP Unit 1 by about a few days or months, whereas the optimal inspection periods are in about the same range. (author)

  12. Responses of Medullary Lateral Line Units of the Goldfish, Carassius auratus, to Amplitude-Modulated Sinusoidal Wave Stimuli

    Directory of Open Access Journals (Sweden)

    Ramadan Ali

    2010-01-01

    Full Text Available This paper describes the responses of brainstem lateral line units in goldfish, Carassius auratus, to constant-amplitude and to amplitude-modulated sinusoidal water motions. If stimulated with constant-amplitude sinusoidal water motions, units responded with phasic (50% or with sustained (50% increases in dicharge rate. Based on isodisplacement curves, units preferred low (33 Hz, 12.5%, mid (50 Hz, 10% and 100 Hz, 30% or high (200 Hz, 47.5% frequencies. In most units, responses were weakly phase locked to the carrier frequency. However, at a carrier frequency of 50 Hz or 100 Hz, a substantial proportion of the units exhibited strong phase locking. If stimulated with amplitude-modulated water motions, units responded with a burst of discharge to each modulation cycle, that is, units phase locked to the amplitude modulation frequency. Response properties of brainstem units were in many respects comparable to those of midbrain units, suggesting that they emerge first in the lateral line brainstem.

  13. Sustained reduction of central line-associated bloodstream infections outside the intensive care unit with a multimodal intervention focusing on central line maintenance.

    Science.gov (United States)

    Dumyati, Ghinwa; Concannon, Cathleen; van Wijngaarden, Edwin; Love, Tanzy M T; Graman, Paul; Pettis, Ann Marie; Greene, Linda; El-Daher, Nayef; Farnsworth, Donna; Quinlan, Gail; Karr, Gloria; Ward, Lynnette; Knab, Robin; Shelly, Mark

    2014-07-01

    Central venous catheter use is common outside the intensive care units (ICUs), but prevention in this setting is not well studied. We initiated surveillance for central line-associated bloodstream infections (CLABSIs) outside the ICU setting and studied the impact of a multimodal intervention on the incidence of CLABSIs across multiple hospitals. This project was constructed as a prospective preintervention-postintervention design. The project comprised 3 phases (preintervention [baseline], intervention, and postintervention) over a 4.5-year period (2008-2012) and was implemented through a collaborative of 37 adult non-ICU wards at 6 hospitals in the Rochester, NY area. The intervention focused on engagement of nursing staff and leadership, nursing education on line care maintenance, competence evaluation, audits of line care, and regular feedback on CLABSI rates. Quarterly rates were compared over time in relation to intervention implementation. The overall CLABSI rate for all participating units decreased from 2.6/1000 line-days preintervention to 2.1/1,000 line-days during the intervention and to 1.3/1,000 line-days postintervention, a 50% reduction (95% confidence interval, .40-.59) compared with the preintervention period (P .0179). A multipronged approach blending both the adaptive and technical aspects of care including front line engagement, education, execution of best practices, and evaluation of both process and outcome measures may provide an effective strategy for reducing CLABSI rates outside the ICU. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  14. Africanization in the United States: replacement of feral European honeybees (Apis mellifera L.) by an African hybrid swarm.

    Science.gov (United States)

    Pinto, M Alice; Rubink, William L; Patton, John C; Coulson, Robert N; Johnston, J Spencer

    2005-08-01

    The expansion of Africanized honeybees from South America to the southwestern United States in feral population from the southern United States undergoing Africanization. Our microsatellite data showed that (1) the process of Africanization involved both maternal and paternal bidirectional gene flow between European and Africanized honeybees and (2) the panmitic European population was replaced by panmitic mixtures of A. m. scutellata and European genes within 5 years after Africanization. The post-Africanization gene pool (1998-2001) was composed of a diverse array of recombinant classes with a substantial European genetic contribution (mean 25-37%). Therefore, the resulting feral honeybee population of south Texas was best viewed as a hybrid swarm.

  15. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Science.gov (United States)

    D'Emic, Michael D; Whitlock, John A; Smith, Kathlyn M; Fisher, Daniel C; Wilson, Jeffrey A

    2013-01-01

    Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days). Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size), and derived titanosaurs and diplodocoids independently evolved the highest known tooth replacement rates among archosaurs.

  16. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Directory of Open Access Journals (Sweden)

    Michael D D'Emic

    Full Text Available BACKGROUND: Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. METHODOLOGY/PRINCIPAL FINDINGS: We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days. Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. CONCLUSIONS/SIGNIFICANCE: Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size, and derived titanosaurs and

  17. On-line estimator/detector design for a plutonium nitrate concentrator unit

    International Nuclear Information System (INIS)

    Candy, J.V.; Rozsa, R.B.

    1979-04-01

    In this report we consider the design of a nonlinear estimator to be used in conjunction with on-line detectors for a plutonium/concentrator. Using a complex state-of-the-art process model to simulate realistic data, we show that the estimator performance using a simplified process model is adequate over a wide range of operation. The estimator is used to simulate and characterize some on-line diversion detectors, i.e., detectors designed to indicate if some of the critical special nuclear material in process is stolen or diverted from the unit. Several different diversion scenarios are presented. Simulation results indicate that the estimators and detectors yielded reasonable performance for the scenarios investigated

  18. Age replacement policy based on imperfect repair with random probability

    International Nuclear Information System (INIS)

    Lim, J.H.; Qu, Jian; Zuo, Ming J.

    2016-01-01

    In most of literatures of age replacement policy, failures before planned replacement age can be either minimally repaired or perfectly repaired based on the types of failures, cost for repairs and so on. In this paper, we propose age replacement policy based on imperfect repair with random probability. The proposed policy incorporates the case that such intermittent failure can be either minimally repaired or perfectly repaired with random probabilities. The mathematical formulas of the expected cost rate per unit time are derived for both the infinite-horizon case and the one-replacement-cycle case. For each case, we show that the optimal replacement age exists and is finite. - Highlights: • We propose a new age replacement policy with random probability of perfect repair. • We develop the expected cost per unit time. • We discuss the optimal age for replacement minimizing the expected cost rate.

  19. C30 Support Plate for Replacing Function of Service Pool 1 at Unit 2

    International Nuclear Information System (INIS)

    Zsoldos, F.

    2006-01-01

    Paks NPP had a serious event at Unit 2 in April 2003. This event was connected to Service Pool 1, there was a cleaning tank int he pool to clean the fuel assemblies from sediments. The sediment problem has occurred at three of our four units, the cause of this problem was the decontamination of the steam generators. We have not made any decontamination at Unit 4 only, and there is no any problem at Unit 4 at all. The plant tried out the mentioned cleaning method at Unit 2 first time, and the event happened at that time. Because of the event the function of Service Pool 1 was not available, the damaged fuel and the cleaning tank is in the pool at this moment. We got the permission from the authority body to operate again Unit 2. This operation, the planned campaign was a short one because of the limited possibility to set up a proper core from the fuel assemblies what were available. Because of the short campaign we had to prepare a proper solution to accomplish the refuelling at Unit 2. The main obstacle was the unavailable functionality of Service Pool 1 which used to carry in fresh fuel and carry out the spent fuel with usage of C30 casks (we have two C30 casks, as it shown in their names the casks can contain 30 fuel assemblies, fresh or spent fuel depending on the given activity have to be done). The plant started to find out what would be the proper solution to replace the function of Service Pool 1 and the C30 support plate was found out as the possible solution to this problem. This C30 support plate is ready to launch the C30 casks or containers with the fresh or spent fuel into the reactor. It means that this C30 support plate is adjusted to the reactor main surface and in this way it ready to serve replacing Service Pool 1. Of course the reactor is empty during the preparation phase of the refuelling. First we carry out the spent fuel from the spent fuel pool, after that the fresh fuel is carried in and just after these preparing activities can be started

  20. Use of mock-up training to reduce personnel exposure at the North Anna Unit 1 Steam Generator Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    Henry, H.G. [Virginia Power, Mineral, VA (United States); Reilly, B.P. [Bechtel Power Corp., Gaithersburg, MD (United States)

    1995-03-01

    The North Anna Power Station is located on the southern shore of Lake Anna in Louisa County, approximately forty miles northwest of Richmond, Virginia. The two 910 Mw nuclear units located on this site are owned by Virginia Electric and Power Company (Virginia Power) and Old Dominion Electric Cooperative and operated by Virginia Power. Fuel was loaded into Unit 1 in December 1977, and it began commercial operation in June 1978. Fuel was loaded into Unit 2 in April 1980 and began commercial operation in December 1980. Each nuclear unit includes a three-coolant-loop pressurized light water reactor nuclear steam supply system that was furnished by Westinghouse Electric Corporation. Included within each system were three Westinghouse Model 51 steam generators with alloy 600, mill-annealed tubing material. Over the years of operation of Unit 1, various corrosion-related phenomena had occurred that affected the steam generators tubing and degraded their ability to fulfill their heat transfer function. Advanced inspection and repair techniques helped extend the useful life of the steam generators, but projections based on the results of the inspections indicated that the existing steam generators tubing and degraded their ability to fullfill their heat transfer function. Advanced inspection and repair techniques helped extend the useful life of the steam generators, but projections based on the results of the inspections indicated that the existing steam generators would not last their design life and must be repaired. To this end Virginia Power determined that a steam generator replacement (SGR) program was necessary to remove the old steam generator tube bundles and lower shell sections, including the channel heads (collectively called the lower assemblies), and replace them with new lower assemblies incorporating design features that will prevent the degradation problems that the old steam generators had experienced.

  1. Units for on-line control with the ES computer in physical investigations

    International Nuclear Information System (INIS)

    Efimov, L.G.

    1983-01-01

    The peripheral part of complex of means created for organization of ES computer operation on-line with experimental devices, comprising two units is described. The first unit is employed as a part of a universal driver of the Camac branch for connection with microprogram ES computer channel controller and ensures multioperational (up to 44 record varieties) device software service. The bilateral data exchange between the device and computer can be performed by bytes as well as 16 or 24-digit words using CAMAC group modes and with maximum rate of 1.25 Mbyte/s. The second unit is meant for synchronization of the data aquisition process with the device starting system and for ensuring the device operator dialogue with the computer

  2. Acceptance test for 900 MWe PWR unit replacement steam generators

    International Nuclear Information System (INIS)

    Gourguechon, B.

    1993-01-01

    During the first half of 1994, the Gravelines 1 steam generators will be replaced (SG replacement procedure). The new SG's differ from the former components notably by the alloy used for the tube bundle, in this case, the high chromium content Inconel 690. So, from this standpoint, they are to be considered as PWR 900 replacement SG first models and their thermal efficiency has consequently to be assessed. This will provide an opportunity of ensuring that the performance of the components delivered is in compliance with requirements and of making the necessary provisions if significant deviations are observed. The EFMT branch, which has been in charge of the instrumentation and acceptance of the different SG first models since the first PWR plants were commissioned, will be responsible for the acceptance tests and the ultimate validation of a performance assessment procedure applicable to the future replacement steam generators. The methods and tests proposed for SG expert appraisal are based on consideration of the importance of primary measurement quality for satisfactory SG assessment and of the new test facilities with which the 900 and 1 300 PWR plants are gradually being equipped. These facilities provide an on-site computer environment for tests compatible with the tools (PATTERN, etc.) used at EFMT and in other departments. This test is the first of this kind performed by EFMT and the test facility of a nuclear power plant. (author). 6 figs

  3. International examples of steam generator replacement

    International Nuclear Information System (INIS)

    Wiechmann, K.

    1993-01-01

    Since 1979-1980 a total of twelve nuclear power plants world-wide have had their steam generators replaced. The replacement of the Combustion steam generators in the Millstone-2 plant in the United States was completed very recently. Steam generator replacement activities are going on at present in four plants. In North Anna, the steam generators have been under replacement since January 1990. In Japan, preparations have been started for Genkai-1. Since January 1992, the two projects in Beznau-1, Switzerland, and Doel-3, Belgium, have bee planned and executed in parallel. Why steam generator replacement? There are a number of defect mechanisms which give rise to the need for early steam generator replacement. One of the main reasons is the use of Inconel-600 as material for the heating tubes. Steam generator heating tubes made of Inconel-600 have been known to exhibit their first defects due to stress corrosion cracking after less than one year of operation. (orig.) [de

  4. Delirium After Transcatheter Aortic Valve Replacement.

    Science.gov (United States)

    Giuseffi, Jennifer L; Borges, Nyal E; Boehm, Leanne M; Wang, Li; McPherson, John A; Fredi, Joseph L; Ahmad, Rashid M; Ely, E Wesley; Pandharipande, Pratik P

    2017-07-01

    Postoperative delirium is associated with increased mortality. Patients undergoing transcatheter aortic valve replacement are at risk for delirium because of comorbid conditions. To compare the incidence, odds, and mortality implications of delirium between patients undergoing transcatheter replacement and patients undergoing surgical replacement. The Richmond Agitation-Sedation Scale and the Confusion Assessment Method for the Intensive Care Unit were used to assess arousal level and delirium prospectively in all patients with severe aortic stenosis who had transcatheter or surgical aortic valve replacement at an academic medical center. Multivariable logistic regression was used to determine the relationship between procedure type and occurrence of delirium. Cox regression was used to assess the association between postoperative delirium and 6-month mortality. A total of 105 patients had transcatheter replacement and 121 had surgical replacement. Patients in the transcatheter group were older (median age, 81 vs 68 years; P replacement. Delirium is less likely to develop in the transcatheter group but is associated with higher mortality in both groups. ©2017 American Association of Critical-Care Nurses.

  5. Efforts for optimization of BWR core internals replacement

    International Nuclear Information System (INIS)

    Iizuka, N.

    2000-01-01

    The core internal components replacement of a BWR was successfully completed at Fukushima-Daiichi Unit 3 (1F3) of the Tokyo Electric Power Company (TEPCO) in 1998. The core shroud and the majority of the internal components made by type 304 stainless steel (SS) were replaced with the ones made of low carbon type 316L SS to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. Although this core internals replacement project was completed, several factors combined to result in a longer-than-expected period for the outage. It was partly because the removal work of the internal components was delayed. Learning a lesson from whole experience in this project, some methods were adopted for the next replacement project at Fukushima-Daiichi Unit 2 (1F2) to shorten the outage and reduce the total radiation exposure. Those are new removal processes and new welding machine and so on. The core internals replacement work was ended at 1F2 in 1999, and both the period of outage and the total radiation exposure were the same degree as expected previous to starting of this project. This result shows that the methods adopted in this project are basically applicable for the core internals replacement work and the whole works about the BWR core internals replacement were optimized. The outline of the core internals replacement project and applied technologies at 1F3 and 1F2 are discussed in this paper. (author)

  6. Functional design criteria radioactive liquid waste line replacement, Project W-087. Revision 3

    International Nuclear Information System (INIS)

    McVey, C.B.

    1994-01-01

    This document provides the functional design criteria for the 222-S Laboratory radioactive waste drain piping and transfer pipeline replacement. The project will replace the radioactive waste drain piping from the hot cells in 222-S to the 219-S Waste Handling Facility and provide a new waste transfer route from 219-S to the 244-S Catch Station in Tank Farms

  7. Type II dehydroquinase: molecular replacement with many copies

    International Nuclear Information System (INIS)

    Stewart, Kirsty Anne; Robinson, David Alexander; Lapthorn, Adrian Jonathan

    2007-01-01

    The type II dehydroquinase enzyme is a symmetrical dodecameric protein which crystallizes in either high-symmetry cubic space groups or low-symmetry crystal systems with multiple copies in the asymmetric unit. Both systems have provided challenging examples for molecular replacement; for example, a triclinic crystal form has 16 dodecamers (192 monomers) in the unit cell. Three difficult examples are discussed and two are used as test cases to compare the performance of four commonly used molecular-replacement packages. Type II dehydroquinase is a small (150-amino-acid) protein which in solution packs together to form a dodecamer with 23 cubic symmetry. In crystals of this protein the symmetry of the biological unit can be coincident with the crystallographic symmetry, giving rise to cubic crystal forms with a single monomer in the asymmetric unit. In crystals where this is not the case, multiple copies of the monomer are present, giving rise to significant and often confusing noncrystallographic symmetry in low-symmetry crystal systems. These different crystal forms pose a variety of challenges for solution by molecular replacement. Three examples of structure solutions, including a highly unusual triclinic crystal form with 16 dodecamers (192 monomers) in the unit cell, are described. Four commonly used molecular-replacement packages are assessed against two of these examples, one of high symmetry and the other of low symmetry; this study highlights how program performance can vary significantly depending on the given problem. In addition, the final refined structure of the 16-dodecamer triclinic crystal form is analysed and shown not to be a superlattice structure, but rather an F-centred cubic crystal with frustrated crystallographic symmetry

  8. Description of the attitude control, guidance and navigation space replaceable units for automated space servicing of selected NASA missions

    Science.gov (United States)

    Chobotov, V. A.

    1974-01-01

    Control elements such as sensors, momentum exchange devices, and thrusters are described which can be used to define space replaceable units (SRU), in accordance with attitude control, guidance, and navigation performance requirements selected for NASA space serviceable mission spacecraft. A number of SRU's are developed, and their reliability block diagrams are presented. An SRU assignment is given in order to define a set of feasible space serviceable spacecraft for the missions of interest.

  9. 78 FR 26383 - Environmental Assessment of the Proposed Increase in Operation, Maintenance and Replacement...

    Science.gov (United States)

    2013-05-06

    ... Proposed Increase in Operation, Maintenance and Replacement Activities Associated With the Wasatch County... of potential impacts associated with a proposed change in Operation, Maintenance and Replacement..., Maintenance, and Replacement Proposed Action includes: stabilizing canal banks; lining, piping, or enclosing...

  10. 30 CFR 872.29 - What are prior balance replacement funds?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false What are prior balance replacement funds? 872... § 872.29 What are prior balance replacement funds? “Prior balance replacement funds” are moneys we must... general funds of the United States Treasury that are otherwise unappropriated. Under section 411(h)(1) of...

  11. RO unit for canned coffee drink processing line. Shipped to Tone Coca-Cola Bottling Co. Ltd., Ibaraki plant; Coffee line yo RO sochi. Tone Coca-Cola Bottling (kabu) Ibaraki kojo nonyu

    Energy Technology Data Exchange (ETDEWEB)

    Nakajima, K. [Ebara Corp., Tokyo (Japan)

    1996-01-20

    The paper introduces an RO unit (reverse osmotic membrane equipment) for producing water holding for the canned coffee drink processing line introduced to the Ibaraki plant of Tone Coca-Cola Bottling Co. The unit aims at reducing hardness components from city water and producing water holding for the coffee drink processing line. The capacity of the unit is 25m{sup 3}/h and the recovery rate is 80%. The unit is composed of a sand filter, an heat exchanger, a pre-filter, RO modules, a treated water tank, chemicals storage tanks, and an RO cleaning unit, which are all for pretreatment. The treated water, into which chlorine is injected, is sent through the existing activated carbon tower and micro filter to the processing line. The RO unit can remove at the same time ion and trihalomethane, pathogens, organic matters which are substances other than hardness components. The continued water bottling is possible with no need for the usual reproduction process, and the maintenance is easy. Because of the high hardness of the supplied raw water, acid is injected at the primary side of the unit for pH regulation to prevent scale deposition in the RO modules. The quality of the treated water well met the specifications. 2 figs., 2 tabs.

  12. Insurance for replacement power costs

    International Nuclear Information System (INIS)

    Cleaver, A.

    1980-01-01

    Although careful consideration is given to insurance against physical damage to plant and equipment, little thought is given to the costs that will be incurred in replacing the power that is lost while a relatively efficient system is out of action. The results of an investigation carried out for a generating authority with an installed capacity of about 3000 MW is given. Replacement power costs for different cases of severity of damage range from Pound1.17m per month for damage to central services taking out all four units. (author)

  13. Testing of Replacement Bag Material

    International Nuclear Information System (INIS)

    Laurinat, J.E.

    1998-01-01

    Recently, the FB-Line bagout material was changed to simplify the processing of sand, slag, and crucible.The results of the strength tests and the outgassing measurements and calculations demonstrate that the proposed replacement nylon bag materials (HRMP and orange anti-static material) are acceptable substitutes for LDPE and the original nylon with respect to mechanical properties

  14. 40 CFR 74.47 - Transfer of allowances from the replacement of thermal energy-combustion sources.

    Science.gov (United States)

    2010-07-01

    ... replacement of thermal energy-combustion sources. 74.47 Section 74.47 Protection of Environment ENVIRONMENTAL...—combustion sources. (a) Thermal energy plan—(1) General provisions. The designated representative of an opt... quarter the replacement unit(s) will replace thermal energy of the opt-in source; (ii) The name...

  15. Theoretical Analysis of Moving Reference Planes Associated with Unit Cells of Nonreciprocal Lossy Periodic Transmission-Line Structures

    Directory of Open Access Journals (Sweden)

    S. Lamultree

    2017-04-01

    Full Text Available This paper presents a theoretical analysis of moving reference planes associated with unit cells of nonreciprocal lossy periodic transmission-line structures (NRLSPTLSs by the equivalent bi-characteristic-impedance transmission line (BCITL model. Applying the BCITL theory, only the equivalent BCITL parameters (characteristic impedances for waves propagating in forward and reverse directions and associated complex propagation constants are of interest. An infinite NRLSPTLS is considered first by shifting a reference position of unit cells along TLs of interest. Then, a semi-infinite terminated NRLSPTLS is investigated in terms of associated load reflection coefficients. It is found that the equivalent BCITL characteristic impedances of the original and shifted unit cells are mathematically related by the bilinear transformation. In addition, the associated load reflection coefficients of both unit cells are mathematically related by the bilinear transformation. However, the equivalent BCITL complex propagation constants remain unchanged. Numerical results are provided to show the validity of the proposed theoretical analysis.

  16. Identification of two distinct chromosome 12-derived amplification units in neuroblastoma cell line NGP

    NARCIS (Netherlands)

    van Roy, N.; Forus, A.; Myklebost, O.; Cheng, N. C.; Versteeg, R.; Speleman, F.

    1995-01-01

    The neuroblastoma cell line NGP contains two homogeneously staining regions (hsr). One of these hsrs contains MYCN sequences. Reverse painting experiments demonstrated that the second HSR consisted of two chromosome 12-derived amplification units, located at 12q14-15 and 12q24. Southern blot and

  17. A Bayesian perspective on age replacement with minimal repair

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Yeh, R.H.; Lin, Y.-B.; Juang, M.-G.

    1999-01-01

    In this article, a Bayesian approach is developed for determining an optimal age replacement policy with minimal repair. By incorporating minimal repair, planned replacement, and unplanned replacement, the mathematical formulas of the expected cost per unit time are obtained for two cases - the infinite-horizon case and the one-replacement-cycle case. For each case, we show that there exists a unique and finite optimal age for replacement under some reasonable conditions. When the failure density is Weibull with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal age replacement policy. Further, various special cases are discussed in detail. Finally, a numerical example is given

  18. Mechanical Aortic Valve Replacement in Octogenarian

    Directory of Open Access Journals (Sweden)

    Irfan Tasoglu

    2013-10-01

    Full Text Available Aim: This study analyzes the long-term outcomes of mechanical aortic valve replacement in octogenarian patients. Material and Method: A retrospective review was performed on 23 octogenarian patients who underwent mechanical aortic valve replacement. Hospital mortality, postoperative intensive care unit stay, hospital stay and long-term results was examined. Estimates of the cumulative event mortality rate were calculated by the Kaplan-Meier method. Results: The mean age of all patients was 82.9±2.3 years and most were men (65.22%. The median ejection fraction was 45%. 73.91% of patients were in New York Heart Association class III-IV. Thirteen patients (56.52% in this study underwent combined procedure, the remaining 10 (43.48% patients underwent isolated aortic valve replacement. The most common valve size was 23 mm. The mean intensive care unit stay was 1.76±1.14 days. The mean hospital stay was 9.33±5.06 days. No complications were observed in 56.52% patients during their hospital stay. The overall hospital mortality was 8.7%. Follow-up was completed for all 23 patients. Median follow-up time was 33 months (1-108 months. Actuarial survival among discharged from hospital was 59% at 5 years. Discussion: Mechanical aortic valve replacement is a safe procedure in octogenarian patients and can be performed safely even in combined procedure.

  19. Nuclear facilities: repair and replacement technologies

    International Nuclear Information System (INIS)

    2005-01-01

    The oldest operating reactors are more than 35 years old and are now facing major maintenance operations. The first replacement of a pressurizer took place in autumn 2005 at the St-Lucie plant (Usa) while steam generators have been currently replaced since 1983. Nuclear industry has to adapt to this new market by proposing innovative technological solutions in the reactor maintenance field. This document gathers the 9 papers presented at the conference. The main improvements concern repair works on internal components of PWR-type reactors, the replacement of major components of the primary coolant circuit and surface treatments to limit the propagation of damages. The first paper shows that adequate design and feedback experience are good assets to manage the ageing of a nuclear unit. Another paper shows that a new repair method of a relief valve can avoid its replacement. (A.C.)

  20. Maintenance and replacement policies under technological obsolescence

    International Nuclear Information System (INIS)

    Clavareau, Julien; Labeau, Pierre-Etienne

    2009-01-01

    The technological obsolescence of a unit is characterized by the existence of challenger units displaying identical functionalities, but with higher performances. This paper aims to define and model in a realistic way, possible maintenance policies of a system including replacement strategies when one type of challenger unit is available. The comparison of these possible strategies is performed based on a Monte Carlo estimation of the costs they incur

  1. Maintenance and replacement policies under technological obsolescence

    Energy Technology Data Exchange (ETDEWEB)

    Clavareau, Julien [Service de Metrologie Nucleaire, Universite Libre de Bruxelles, Av. Franklin Roosevelt 50, CP165/84 Bruxelles B-1050 (Belgium)], E-mail: jclavare@ulb.ac.be; Labeau, Pierre-Etienne [Service de Metrologie Nucleaire, Universite Libre de Bruxelles, Av. Franklin Roosevelt 50, CP165/84 Bruxelles B-1050 (Belgium)], E-mail: pelabeau@ulb.ac.be

    2009-02-15

    The technological obsolescence of a unit is characterized by the existence of challenger units displaying identical functionalities, but with higher performances. This paper aims to define and model in a realistic way, possible maintenance policies of a system including replacement strategies when one type of challenger unit is available. The comparison of these possible strategies is performed based on a Monte Carlo estimation of the costs they incur.

  2. Ultrasonic unit for line-by-line ultrasonic scanning of bodies

    International Nuclear Information System (INIS)

    Soldner, R.

    1978-01-01

    The ultrasonic unit for medical diagnostics operates by the sectorial scanning principle, which avoids direct coupling of the transducer head to the surface of the body. For this purpose, several transmitter/receiver units (approx. 100) are arranged on a partial ring of a circular arc and the ultrasonic beams, which can be triggered sequentially in time, are directed at a common intersection behind the ultrasonic window of the unit, i.e., outside the unit. A mechanical system is employed to set and adjust the partial ring carrying the transmitter/receiver units. (DG) [de

  3. Steam generator replacement at Doel 3 NPP (Belgium)

    International Nuclear Information System (INIS)

    Danhier, B.

    1993-01-01

    The reasons are presented that led to the conclusion that the most cost-effective strategy for the Doel 3 unit was the immediate replacement of the SG. Discussed are the advantages and drawbacks of the replacement techniques, the so-called 2, 3 and 4 cuts methods. The advantages are emphasized of intensive use of computer aided engineering in this kind of backfitting. The methodology applied to combine a power uprating of 10% over the nominal power with the steam generator replacement is presented. (author) 1 fig

  4. The use of adaptive equipment following total knee replacement

    OpenAIRE

    McNaught, Jamie; Paul, Lorna

    2015-01-01

    Introduction: This study evaluates the need for adaptive equipment following total knee replacement. There are no recent studies to guide occupational therapists in the optimum time adaptive equipment is required following total knee replacement.\\ud \\ud Method: A non-experimental, concurrent mixed methods approach was used. The study population was patients attending for total knee replacement at a large general hospital. Outcome measures were the Oxford Knee Score, the United Kingdom Functio...

  5. Chemical investigations of isotope separation on line target units for carbon and nitrogen beams

    CERN Document Server

    Franberg, H; Gäggeler, H W; Köster, U

    2006-01-01

    Radioactive ion beams (RIBs) are of significant interest in a number of applications. Isotope separation on line (ISOL) facilities provide RIB with high beam intensities and good beam quality. An atom that is produced within the ISOL target will first diffuse out from the target material. During the effusion towards the transfer line and into the ion source the many contacts with the surrounding surfaces may cause unacceptable delays in the transport and, hence, losses of the shorter-lived isotopes. We performed systematic chemical investigations of adsorption in a temperature and concentration regime relevant for ISOL targets and ion source units, with regard to CO/sub x/ and NOmaterials are potential construction materials for the above-mentioned areas. Off-line and on-line tests have been performed using a gas thermochromatography setup with radioactive tracers. The experiments were performed at the production of tracers for atmospheric chemistry (PROTRAC) facility at the Paul Schener Institute in Villigen...

  6. A Petri net-based modelling of replacement strategies under technological obsolescence

    Energy Technology Data Exchange (ETDEWEB)

    Clavareau, Julien [Universite Libre de Bruxelles (U.L.B.), Service de Metrologie Nucleaire, Av. F.D. Roosevelt, 50 (CP165/84), Bruxelles B-1050 (Belgium)], E-mail: jclavare@ulb.ac.be; Labeau, Pierre-Etienne [Universite Libre de Bruxelles (U.L.B.), Service de Metrologie Nucleaire, Av. F.D. Roosevelt, 50 (CP165/84), Bruxelles B-1050 (Belgium)

    2009-02-15

    The technological obsolescence of a unit is characterised by the existence of challenger units displaying identical functionalities, but with higher performances. Though this issue is commonly encountered in practice, it has received little consideration in the literature. Previous exploratory works have treated the problem of replacing old-technology items by new ones, for identical components facing a unique new generation of items. This paper aims to define, in a realistic way, possible replacement policies when several types of challenger units are available and when the performances of these newly available units improve with time. Since no fully generic model can exist in maintenance optimisation, a modular modelling of the problem, allowing easy adaptations to features corresponding to specific applications is highly desirable. This work therefore proposes a modular Petri net model for this problem, underlying a Monte Carlo (MC) estimation of the costs incurred by the different possible replacement strategies under consideration.

  7. Capability to Recover Plutonium-238 in H-Canyon/HB-Line - 13248

    Energy Technology Data Exchange (ETDEWEB)

    Fuller, Kenneth S. Jr.; Smith, Robert H. Jr.; Goergen, Charles R. [Savannah River Nuclear Solutions, LLC, Savannah River Site, Aiken, SC 29802 (United States)

    2013-07-01

    Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site had previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np- 237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-Canyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase- 3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ∼2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment

  8. Development of Live-working Robot for Power Transmission Lines

    Science.gov (United States)

    Yan, Yu; Liu, Xiaqing; Ren, Chengxian; Li, Jinliang; Li, Hui

    2017-07-01

    Dream-I, the first reconfigurable live-working robot for power transmission lines successfully developed in China, has the functions of autonomous walking on lines and accurately positioning. This paper firstly described operation task and object of the robot; then designed a general platform, an insulator replacement end and a drainage plate bolt fastening end of the robot, presented a control system of the robot, and performed simulation analysis on operation plan of the robot; and finally completed electrical field withstand voltage tests in a high voltage hall as well as online test and trial on actual lines. Experimental results show that by replacing ends of manipulators, the robot can fulfill operation tasks of live replacement of suspension insulators and live drainage plate bolt fastening.

  9. Esophageal Replacement for Long-Gap Esophageal Atresia in a ...

    African Journals Online (AJOL)

    humility to know when to consider a replacement procedure (3). To replace the esophagus of a baby is a major decision in many pediatric surgical units world over. Fortunately, the need for this procedure has decreased in the recent years due to the increase in the variety of techniques of lengthening the upper esophageal ...

  10. Coupled RELAP5/PANTHER/COBRA steam line break accident analysis in support of licensing DOEL 2 power uprate and steam generator replacement

    International Nuclear Information System (INIS)

    Zhang, J.; Bosso, S.; Henno, X.; Ouliddren, K.; Schneidesch, C.R.; Hove, W. van

    2004-01-01

    The nuclear reactor accident analyses using best estimate codes provide a better understanding and more accurate modeling of the key physical phenomena, which allows a more realistic evaluation of the conservatism and margins in the final safety analysis report (FSAR) accident analysis. The use of the best estimate codes and methods is necessary to meet the increasing technical, licensing and regulatory requirements for major plant changes (e.g. steam generator replacement), power uprate, core design optimization (cycle extension), as well as Periodic Safety Review. Since 1992, Tractebel Engineering (TE) has developed and applied a deterministic bounding approach to FASR accident analysis using the best estimate system thermal hydraulic code RELAP5/MOD2.5 and the subchannel thermal hydraulic code COBRA-3C. This approach has been accepted by the Belgian Safety Authorities, and turned out to be cost effective for most of the non-LOCA transient analyses. Since this approach adapts a decoupled modeling of the core responses, the analysis results often involved too large un-quantified conservatisms, due to either simplistic approximations for asymmetric accidents with strong 3D core neutronics - plant thermal hydraulics interactions, or additional penalties introduced from 'incoherent' initial/boundary conditions for separate plant and core analyses. Therefore, an external dynamic coupling between the RELAP5/MOD2.5 code and the 3-D neutronic code PANTHER was implemented since 1997 via the transient analysis code linkage program TALINK. Furthermore, a static linkage between the PANTHER code and the COBRA-3C code was developed for on-line calculation of (Departure from Nucleate Boiling Ratio (DNBR). TE intends to use the coupled code package for licensing non-symmetric FSAR accident analysis. The TE coupled code package has been applied to develop a main steam line break (MSLB) accident analysis methodology [using the TE deterministic bounding approach. The methodology

  11. Steam generator replacement at Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Kimura, S.; Dodo, Takashi; Negishi, Kazuo

    1995-01-01

    Eleven nuclear units are in operation at the Kansai Electric Power Co., Inc.. In seven of them, Mihama-1·2·3, Takahama-1·2, and Ohi-1·2, comparatively long duration for tube inspection and repair have been required during late annual outages. KEPCO decided to replace all steam generators in these 7 units with the latest model which was improved upon the past degradation experiences, as a result of comprehensive considerations including public confidence in nuclear power generation, maintenability, and economic efficiency. This report presents the design improvements in new steam generators, replacement techniques, and so on. (author)

  12. Midflexion instability in primary total knee replacement: a review

    Directory of Open Access Journals (Sweden)

    Ramappa Manjunath

    2015-01-01

    Full Text Available Introduction: Midflexion instability in primary total knee replacement (TKR is an evolving concept. Successful treatment of instability requires an understanding of the different types of instability. Methods: A literature review was performed to identify information pertinent to midflexion instability in primary total knee replacement, utilising PRISMA guidelines. Databases searched included Embase, Medline, All of the Cochrane Library, PubMed and cross references. Results: Three factors, i.e., elevated joint line, multiradii femoral component and medial collateral ligament (MCL laxity, were identified to influence midflexion instability. Literature suggested mediolateral instability at 30–60° of flexion as diagnostic of midflexion instability. Literature search also revealed paucity in clinical studies analysing midflexion instability. Most of the evidence was obtained from cadaveric studies for elevated joint line and MCL laxity. Clinical studies on multiradii femoral component were limited by their small study size and early followup period. Conclusion: Elevated joint line, multiradii femoral component and MCL laxity have been suggested to cause midflexion laxity in primary TKR. Due to limitations in available evidence, this review was unable to raise the strength of overall evidence. Future well-designed clinical studies are essential to make definitive conclusions. This review serves as a baseline for future researchers and creates awareness for routine assessment of midflexion instability in primary total knee replacement.

  13. Modeling the Impacts of Climate Change on Phytogeographical Units. A Case Study of the Moesz Line

    OpenAIRE

    Bede-Fazekas, Ákos

    2013-01-01

    Regional climate models (RCMs) provide reliable climatic predictions for the next 90 years with high horizontal and temporal resolution. In the 21st century northward latitudinal and upward altitudinal shift of the distribution of plant species and phytogeographical units is expected. It is discussed how the modeling of phytogeographical unit can be reduced to modeling plant distributions. Predicted shift of the Moesz line is studied as case study (with three different modeling approaches) us...

  14. Technical development and its application on steam generator replacement

    International Nuclear Information System (INIS)

    Morita, Sadahiko; Hanzawa, Katsumi; Sato, Hajime; Kannoto, Yasuo.

    1995-01-01

    Twenty-two PWR nuclear power plants are now under commercial operation in Japan. Eight of these plants are scheduled to have their steam generators replaced by up-graded units as a social responsibility for improved reliability, economy and easier maintenance. To carry out steam generator replacement, main coolant pipe cutting and restoration techniques, remote controlled welding machines and other remote controlled equipment, templating techniques with which the new steam generator primary nozzles will fit the existing primary pipes correctly were developed. An adequate training program was carried out to establish these techniques and they were then applied in replacement work on site. The steam generators of the three plants were replaced completely in 1994. These newly developed techniques are to be applied in upcoming plants and replaced plants will be much reliable. (author)

  15. Implementing a multifaceted intervention to decrease central line-associated bloodstream infections in SEHA (Abu Dhabi Health Services Company) intensive care units: the Abu Dhabi experience.

    Science.gov (United States)

    Latif, Asad; Kelly, Bernadette; Edrees, Hanan; Kent, Paula S; Weaver, Sallie J; Jovanovic, Branislava; Attallah, Hadeel; de Grouchy, Kristin K; Al-Obaidli, Ali; Goeschel, Christine A; Berenholtz, Sean M

    2015-07-01

    OBJECTIVE To determine whether implementation of a multifaceted intervention would significantly reduce the incidence of central line-associated bloodstream infections. DESIGN Prospective cohort collaborative. SETTING AND PARTICIPANTS Intensive care units of the Abu Dhabi Health Services Company hospitals in the Emirate of Abu Dhabi. INTERVENTIONS A bundled intervention consisting of 3 components was implemented as part of the program. It consisted of a multifaceted approach that targeted clinician use of evidence-based infection prevention recommendations, tools that supported the identification of local barriers to these practices, and implementation ideas to help ensure patients received the practices. Comprehensive unit-based safety teams were created to improve safety culture and teamwork. Finally, the measurement and feedback of monthly infection rate data to safety teams, senior leaders, and staff in participating intensive care units was encouraged. The main outcome measure was the quarterly rate of central line-associated bloodstream infections. RESULTS Eighteen intensive care units from 7 hospitals in Abu Dhabi implemented the program and achieved an overall 38% reduction in their central line-associated bloodstream infection rate, adjusted at the hospital and unit level. The number of units with a quarterly central line-associated bloodstream infection rate of less than 1 infection per 1,000 catheter-days increased by almost 40% between the baseline and postintervention periods. CONCLUSION A significant reduction in the global morbidity and mortality associated with central line-associated bloodstream infections is possible across intensive care units in disparate settings using a multifaceted intervention.

  16. Classification, Social Contracts, Obligations, Civil Rights, and the Supreme Court: Sutton v. United Air Lines.

    Science.gov (United States)

    Turnbull, H. Rutherford, III; Stowe, Matthew J.

    2001-01-01

    This article analyzes the 1999 decision of the U.S. Supreme Court, Sutton v. United Air Lines, as it pertains to people with disabilities, especially students covered by federal education and civil rights legislation. It sets out implications of the decision for special and general educators as they engage in Individualized Education Program…

  17. Gate replacement at the Upper Lake Falls development

    International Nuclear Information System (INIS)

    Chen, C.T.; Locke, A.E.; Brown, E.R.

    1998-01-01

    Nova Scotia Power's integrated approach to dam safety was discussed. One of the two intake gates at Unit 1 of the Upper Falls Power Plant on the Mersey River was replaced in 1997 as part of the Utility's upgrading program. In the event of governor failure or turbine runaway, the new roller gate will allow operators to close the original sliding gate first under a more-or-less balanced head condition, and then to close the new roller gate under a full-flow condition. The planning, design and construction of the new roller gate is described. One of the two head gates of Unit 2 at the same station will be replaced in a similar fashion in the fall of 1998. 4 refs., 7 figs

  18. A comparison of minimally invasive and standard aortic valve replacement.

    Science.gov (United States)

    Stoliński, Jarosław; Plicner, Dariusz; Grudzień, Grzegorz; Wąsowicz, Marcin; Musiał, Robert; Andres, Janusz; Kapelak, Bogusław

    2016-10-01

    The study objective was to compare aortic valve replacement through a right anterior minithoracotomy with aortic valve replacement through a median sternotomy. With propensity score matching, we selected 211 patients after aortic valve replacement through a right anterior minithoracotomy and 211 patients after aortic valve replacement who underwent operation between January 2010 and December 2013. Perioperative outcomes were analyzed, and multivariable logistic regression analysis of risk factors of postoperative morbidity was performed. For propensity score-matched patients, hospital mortality was 1.0% in the aortic valve replacement through a right anterior minithoracotomy group and 1.4% in the aortic valve replacement group (P = 1.000). Stroke occurred in 0.5% versus 1.4% (P = .615), myocardial infarction occurred in 1.4% versus 1.9% (P = 1.000), and new onset of atrial fibrillation occurred in 12.8% versus 24.2% (P = .003) of patients in the aortic valve replacement through a right anterior minithoracotomy and aortic valve replacement groups, respectively. Postoperative drainage was 353.5 ± 248.6 mL versus 544.3 ± 324.5 mL (P replacement through a right anterior minithoracotomy and aortic valve replacement groups, respectively. Mediastinitis occurred in 2.8% of patients after aortic valve replacement and in 0.0% of patients after aortic valve replacement through a right anterior minithoracotomy surgery (P = .040). Intensive care unit stay (1.3 ± 1.2 days vs 2.6 ± 2.6 days) and hospital stay (5.7 ± 1.6 days vs 8.7 ± 4.4 days) were statistically significantly shorter in the aortic valve replacement through a right anterior minithoracotomy group. Aortic valve replacement through a right anterior minithoracotomy surgery resulted in reduced postoperative morbidity (odds ratio, 0.4; P replacement through a right anterior minithoracotomy surgery resulted in a reduced infection rate, diminished postoperative bleeding and blood

  19. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  20. New energy replacement method for resonant power supplies

    International Nuclear Information System (INIS)

    Karady, G.G.; Thiessen, H.A.

    1989-01-01

    The Resonant Power Supply is an economically and technically advanced solution for Rapid Cycling Accelerators. Several papers dealt with the design and operation of these power supplies, however, the energy replacement methods were not discussed in the past. This paper analyzes different energy-replacement methods and presents a new method. This method uses a 24-pulse converter to regulate the magnet current during flat-top and injection periods and replaces the energy loss by charging the accelerator capacitor bank during the flat-top, reset and injection periods, charge is injected in the circuit during the acceleration period, when it replaces the energy loss. This paper compares the new method with the existing ones. The analyses proved the feasibility of the proposed method. The operation of the proposed method was verified by a model experiment, which showed that the new circuit can be controlled accurately and operates with smaller disturbances to the power line than the existing systems. 2 refs., 6 figs., 1 tab

  1. Replacement energy, capacity, and reliability costs for permanent nuclear reactor shutdowns

    International Nuclear Information System (INIS)

    VanKuiken, J.C., Buehring, W.A.; Hamilton, S.; Kavicky, J.A.; Cavallo, J.D.; Veselka, T.D.; Willing, D.L.

    1993-10-01

    Average replacement power costs are estimated for potential permanent shutdowns of nuclear electricity-generating units. Replacement power costs are considered to include replacement energy, capacity, and reliability cost components. These estimates were developed to assist the US Nuclear Regulatory Commission in evaluating regulatory issues that potentially affect changes in serious reactor accident frequencies. Cost estimates were derived from long-term production-cost and capacity expansion simulations of pooled utility-system operations. Factors that affect replacement power cost, such as load growth, replacement sources of generation, and capital costs for replacement capacity, were treated in the analysis. Costs are presented for a representative reactor and for selected subcategories of reactors, based on estimates for 112 individual reactors

  2. A trivariate optimal replacement policy for a deteriorating system based on cumulative damage and inspections

    International Nuclear Information System (INIS)

    Tsai, Hsin-Nan; Sheu, Shey-Huei; Zhang, Zhe George

    2017-01-01

    In this article, we study a trivariate replacement model for a deteriorating system consisting of two units. Failures of unit 1 can be classified into two types. Type I failure (minor failure) is fixed by a minimal repair and type II failure (catastrophic failure) is removed by a replacement. Both types of failures can only be detected through inspection. Each type I failure of unit 1 will result in a random amount of damage to unit 2 and the damages are cumulative. The probability of type I failure or type II failure is assumed to depend on the number of failures since the last replacement. We formulate a replacement policy based on the number of type I failure, the occurrence of the first type II failure, and the amount of accumulative damages. Hence the system is replaced either preventively or correctively at any of the following four conditions depend on whichever occurs first; preventively (a) at the Nth type I failure; or (b) when the total damage of unit 2 exceeds a pre-specified level Z (but less than the failure level l); and, correctively (c) at the first type II failure; or (d) when the total damage of unit 2 exceeds a failure level l, where Z and l represent the thresholds of total damage level for unit 2 to preventive and corrective replacements, respectively. Although a type I failure can be fixed by a minimal repair, but the operating period is stochastically decreasing and repair time is stochastically increasing as time goes on. The minimal total expected long-run net cost per unit time of the system is derived and a computational algorithm for determining the optimal policy is developed. A real-world application from electric power industry is provided. Several past studied are shown to be special cases of our model. Finally, a numerical example is presented. - Highlights: • A trivariate replacement policy for a deteriorating system with two units is proposed. • A real-world application from the electric power industry is provided. • The

  3. Testosterone Replacement, Muscle Strength, and Physical Function

    Directory of Open Access Journals (Sweden)

    You-Seon Nam

    2018-05-01

    Full Text Available Muscle strength and physical function decrease in older men, as do testosterone levels. Nonetheless, the effects of testosterone replacement therapy on muscle strength and physical function remain inconclusive and equivocal. We conducted a rapid systematic review, the results of which showed that testosterone replacement does not affect muscle strength (measured by hand grip strength and leg muscle strength, although it may increase physical function (measured by the 6-minute walk test, Physical Activity Scale for the Elderly score, and other physical performance tests. However, most of the studies were conducted in the United States or Europe and did not include participants from Asian or other ethnic backgrounds; therefore, further studies are needed to evaluate the effects of testosterone replacement in a broader population.

  4. A bivariate optimal replacement policy for a multistate repairable system

    International Nuclear Information System (INIS)

    Zhang Yuanlin; Yam, Richard C.M.; Zuo, Ming J.

    2007-01-01

    In this paper, a deteriorating simple repairable system with k+1 states, including k failure states and one working state, is studied. It is assumed that the system after repair is not 'as good as new' and the deterioration of the system is stochastic. We consider a bivariate replacement policy, denoted by (T,N), in which the system is replaced when its working age has reached T or the number of failures it has experienced has reached N, whichever occurs first. The objective is to determine the optimal replacement policy (T,N)* such that the long-run expected profit per unit time is maximized. The explicit expression of the long-run expected profit per unit time is derived and the corresponding optimal replacement policy can be determined analytically or numerically. We prove that the optimal policy (T,N)* is better than the optimal policy N* for a multistate simple repairable system. We also show that a general monotone process model for a multistate simple repairable system is equivalent to a geometric process model for a two-state simple repairable system in the sense that they have the same structure for the long-run expected profit (or cost) per unit time and the same optimal policy. Finally, a numerical example is given to illustrate the theoretical results

  5. Monetary benefits of preventing childhood lead poisoning with lead-safe window replacement.

    Science.gov (United States)

    Nevin, Rick; Jacobs, David E; Berg, Michael; Cohen, Jonathan

    2008-03-01

    Previous estimates of childhood lead poisoning prevention benefits have quantified the present value of some health benefits, but not the costs of lead paint hazard control or the benefits associated with housing and energy markets. Because older housing with lead paint constitutes the main exposure source today in the US, we quantify health benefits, costs, market value benefits, energy savings, and net economic benefits of lead-safe window replacement (which includes paint stabilization and other measures). The benefit per resident child from improved lifetime earnings alone is $21,195 in pre-1940 housing and $8685 in 1940-59 housing (in 2005 dollars). Annual energy savings are $130-486 per housing unit, with or without young resident children, with an associated increase in housing market value of $5900-14,300 per housing unit, depending on home size and number of windows replaced. Net benefits are $4490-5,629 for each housing unit built before 1940, and $491-1629 for each unit built from 1940-1959, depending on home size and number of windows replaced. Lead-safe window replacement in all pre-1960 US housing would yield net benefits of at least $67 billion, which does not include many other benefits. These other benefits, which are shown in this paper, include avoided Attention Deficit Hyperactivity Disorder, other medical costs of childhood lead exposure, avoided special education, and reduced crime and juvenile delinquency in later life. In addition, such a window replacement effort would reduce peak demand for electricity, carbon emissions from power plants, and associated long-term costs of climate change.

  6. Safety Management of a Clinical Process Using Failure Mode and Effect Analysis: Continuous Renal Replacement Therapies in Intensive Care Unit Patients.

    Science.gov (United States)

    Sanchez-Izquierdo-Riera, Jose Angel; Molano-Alvarez, Esteban; Saez-de la Fuente, Ignacio; Maynar-Moliner, Javier; Marín-Mateos, Helena; Chacón-Alves, Silvia

    2016-01-01

    The failure mode and effect analysis (FMEA) may improve the safety of the continuous renal replacement therapies (CRRT) in the intensive care unit. We use this tool in three phases: 1) Retrospective observational study. 2) A process FMEA, with implementation of the improvement measures identified. 3) Cohort study after FMEA. We included 54 patients in the pre-FMEA group and 72 patients in the post-FMEA group. Comparing the risks frequencies per patient in both groups, we got less cases of under 24 hours of filter survival time in the post-FMEA group (31 patients 57.4% vs. 21 patients 29.6%; p FMEA, there were several improvements in the management of intensive care unit patients receiving CRRT, and we consider it a useful tool for improving the safety of critically ill patients.

  7. Fort Peck-Wolf Point transmission line project, Montana

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the project is to replace the existing 36-mile Fort Peck-Wolf Point transmission line which has reached the end of its useful service life. Presently, the overall condition of this existing section of the 47-year-old line is poor. Frequent repairs have been required because of the absence of overhead ground wires. The continued maintenance of the line will become more expensive and customer interruptions will persist because of the damage due to lightning. The expense of replacing shell rotted poles, and the concern for the safety of the maintenance personnel because of hazards caused by severe shell rot are also of primary importance. The operational and maintenance problems coupled with power system simulation studies, demonstrate the need for improvements to the Wolf Point area to serve area loads. Western's Wolf Point Substation is an important point of interconnection for the power output from the Fort Peck Dam to area loads as far away as Williston, North Dakota. The proposed transmission line replacement would assure that there will continue to be reliable transmission capacity available to serve area electrical loads, as well as provide a reliable second high-voltage transmission path from the Fort Peck generation to back-up a loss of the Fort Peck-Wolf Point 115-kV Line No. 1

  8. The optimal number of heifer calves to be reared as dairy replacements.

    Science.gov (United States)

    Mohd Nor, N; Steeneveld, W; Mourits, M C M; Hogeveen, H

    2015-02-01

    Dairy farmers often keep almost all their newborn heifer calves despite the high cost of rearing. By rearing all heifer calves, farmers have more security and retain flexibility to cope with the uncertainty in the availability of replacement heifers in time. This uncertainty is due to mortality or infertility during the rearing period and the variation in culling rate of lactating cows. The objective of this study is to provide insight in the economically optimal number of heifer calves to be reared as replacements. A herd-level stochastic simulation model was developed specific for this purpose with a herd of 100 dairy cows; the biological part of the model consisted of a dairy herd unit and rearing unit for replacement heifers. The dairy herd unit included variation in the number of culled dairy cows. The rearing unit incorporated variation in the number of heifers present in the herd by including uncertainty in mortality and variation in fertility. The dairy herd unit and rearing unit were linked by the number of replacement heifers and culled dairy cows. When not enough replacement heifers were available to replace culled dairy cows, the herd size was temporarily reduced, resulting in an additional cost for the empty slots. When the herd size reached 100 dairy cows, the available replacement heifers that were not needed were sold. It was assumed that no purchase of cows and calves occurred. The optimal percentage of 2-wk-old heifer calves to be retained was defined as the percentage of heifer calves that minimized the average net costs of rearing replacement heifers. In the default scenario, the optimal retention was 73% and the total net cost of rearing was estimated at €40,939 per herd per year. This total net cost was 6.5% lower than when all heifer calves were kept. An earlier first-calving age resulted in an optimal retention of 75%, and the net costs of rearing were €581 per herd per year lower than in the default scenario. For herds with a lower or

  9. The Reliable Replacement Warhead Program: Background and Current Developments

    National Research Council Canada - National Science Library

    Medalia, Jonathan

    2008-01-01

    ...), part of a larger Stockpile Stewardship Program (SSP), replaces components. Modifying some components would require a nuclear test, but the United States has observed a test moratorium since 1992...

  10. TOTAL KNEE REPLACEMENT IN PATIENTS WITH BELOW-KNEE AMPUTATION

    Science.gov (United States)

    Karam, Matthew D; Willey, Michael; Shurr, Donald G

    2010-01-01

    Total knee replacement (TKR) is reserved for patients with severe and disabling arthritis that is non-responsive to conservative measures. Based on existing data, total knee replacement is a safe and cost-effective treatment for alleviating pain and improving physical function in patients who do not respond to conservative therapy. Despite the large variation in health status of patients and types of prosthesis implanted, total knee replacement has proven to be a relatively low risk and successful operation. Each year in the United States surgeons perform approximately 300,000 TKR.1 Likewise, lower extremity amputation is commonly performed in the United States with an annual incidence of 110,000 per year.2 Nearly 70% of all lower extremity amputations are performed as the result of chronic vascular disease, followed by trauma (22%), congenital etiology and tumor (4% each).3 Approximately 50% of all lower extremity amputations are performed secondary to complications from Diabetes Mellitus. Norvell et al. demonstrated that patients who have previously undergone transtibial amputation and ambulate with a prosthesis are more likely to develop degenerative joint disease in the con-tralateral extremity than the ipsilateral extremity.4 Further, radiographic changes consistent with osteoporosis have been demonstrated in up to 88% of limbs that have undergone transtibial amputation.8 To our knowledge, there have been only three reported cases of total knee replacement in patients with ipsilateral transtibial amputation.5,7 The purpose of the present study is to review the existing data on total knee replacement in patients who have undergone transtibial amputation. Further we present a patient with a transtibial amputation who underwent contralateral total knee replacement. PMID:21045987

  11. The replacement of serum by hormones in cell culture media.

    Science.gov (United States)

    Sato, G; Hayashi, I

    1976-12-01

    The replacement of serum by hormones in cell culture media. (Reemplazo del suero por hormonas en el medio de cultivo de células). Arch. Biol. Med. Exper. 10: 120-121, 1976. The serum used in cell culture media can be replaced by a mixture of hormones and some accesory blood factors. The pituitary cell line GH3 can be grown in a medium in which serum is replaced by triiodothyronine, transferrin, parathormone, tyrotrophin releasing hormone and somatomedins. Hela and BHK cell strains can also be grown in serum free medium supplemented with hormones. Each cell type appears to have different hormonal requirements yet it may found that some hormones are required for most cell types.

  12. Fault Lines in Our Democracy: Civic Knowledge, Voting Behavior, and Civic Engagement in the United States

    Science.gov (United States)

    Coley, Richard J.; Sum, Andrew

    2012-01-01

    As the 21st century unfolds, the United States faces historic challenges, including a struggling economy, an aging infrastructure and global terrorism. Solutions will have to come from educated, skilled citizens who understand and believe in our democratic system and are civically engaged. This incisive new report examines these fault lines and…

  13. Comparing Administrative and Clinical Data for Central Line Associated Blood Stream Infections in Pediatric Intensive Care Unit and Pediatric Cardiothoracic Intensive Care Unit

    Science.gov (United States)

    Bond, Jory; Issa, Mohamed; Nasrallah, Ali; Bahroloomi, Sheena; Blackwood, Roland A.

    2016-01-01

    Central line associated bloodstream infections (CLABSIs) are a frequent source of health complication for patients of all ages, including for patients in the pediatric intensive care unit (PICU) and Pediatric Cardiothoracic Intensive Care Unit (PCTU). Many hospitals, including the University of Michigan Health System, currently use the International Classification of Disease (ICD) coding system when coding for CLABSI. The purpose of this study was to determine the accuracy of coding for CLABSI infections with ICD-9CM codes in PICU and PCTU patients. A retrospective chart review was conducted for 75 PICU and PCTU patients with 90 events of hospital acquired central line infections at the University of Michigan Health System (from 2007-2011). The different variables examined in the chart review included the type of central line the patient had, the duration of the stay of the line, the type of organism infecting the patient, and the treatment the patient received. A review was conducted to assess if patients had received the proper ICD-9CM code for their hospital acquired infection. In addition, each patient chart was searched using Electronic Medical Record Search Engine to determine if any phrases that commonly referred to hospital acquired CLABSIs were present in their charts. Our review found that in most CLABSI cases the hospital’s administrative data diagnosis using ICD-9CM coding systems did not code for the CLABSI. Our results indicate a low sensitivity of 32% in the PICU and an even lower sensitivity of 12% in the PCTU. Using these results, we can conclude that the ICD-9CM coding system cannot be used for accurately defining hospital acquired CLABSIs in administrative data. With the new use of the ICD-10CM coding system, further research is needed to assess the effects of the ICD-10CM coding system on the accuracy of administrative data.

  14. Comparing administrative and clinical data for central line associated blood stream infections in Pediatric Intensive Care Unit and Pediatric Cardiothoracic Intensive Care Unit

    Directory of Open Access Journals (Sweden)

    Jory Bond

    2016-10-01

    Full Text Available Central line associated bloodstream infections (CLABSIs are a frequent source of health complication for patients of all ages, including for patients in the pediatric intensive care unit (PICU and Pediatric Cardiothoracic Intensive Care Unit (PCTU. Many hospitals, including the University of Michigan Health System, currently use the International Classification of Disease (ICD coding system when coding for CLABSI. The purpose of this study was to determine the accuracy of coding for CLABSI infections with ICD-9CM codes in PICU and PCTU patients. A retrospective chart review was conducted for 75 PICU and PCTU patients with 90 events of hospital acquired central line infections at the University of Michigan Health System (from 2007-2011. The different variables examined in the chart review included the type of central line the patient had, the duration of the stay of the line, the type of organism infecting the patient, and the treatment the patient received. A review was conducted to assess if patients had received the proper ICD-9CM code for their hospital acquired infection. In addition, each patient chart was searched using Electronic Medical Record Search Engine to determine if any phrases that commonly referred to hospital acquired CLABSIs were present in their charts. Our review found that in most CLABSI cases the hospital’s administrative data diagnosis using ICD-9CM coding systems did not code for the CLABSI. Our results indicate a low sensitivity of 32% in the PICU and an even lower sensitivity of 12% in the PCTU. Using these results, we can conclude that the ICD-9CM coding system cannot be used for accurately defining hospital acquired CLABSIs in administrative data. With the new use of the ICD- 10CM coding system, further research is needed to assess the effects of the ICD-10CM coding system on the accuracy of administrative data.

  15. [Update in continuous renal replacement techniques].

    Science.gov (United States)

    Romero-García, M; de la Cueva-Ariza, L; Delgado-Hito, P

    2013-01-01

    Acute renal failure affects 25% of patients hospitalized in intensive care units. Despite technological advances, the mortality of these patients is still high due to its associated complications. Continuous renal replacement techniques are one of the treatments for acute renal failure because they make it possible to treat the complications and decrease mortality. The nurse's knowledge and skills regarding these techniques will be decisive for the success of the therapy. Consequently, the nurse's experience and training are key components. The objective of this article is to update the knowledge on continuous renal replacement techniques. Keeping this in mind, a review has been made of the physical and chemical principles such as diffusion and convection, among others. A description of the different continuous renal replacement techniques, a presentation of the main vascular access, and a description of the nursing cares and complications related to techniques used have also been provided. Copyright © 2012 Elsevier España, S.L. y SEEIUC. All rights reserved.

  16. MOEA based design of decentralized controllers for LFC of interconnected power systems with nonlinearities, AC-DC parallel tie-lines and SMES units

    International Nuclear Information System (INIS)

    Ganapathy, S.; Velusami, S.

    2010-01-01

    A new design of Multi-Objective Evolutionary Algorithm based decentralized controllers for load-frequency control of interconnected power systems with Governor Dead Band and Generation Rate Constraint nonlinearities, AC-DC parallel tie-lines and Superconducting Magnetic Energy Storage (SMES) units, is proposed in this paper. The HVDC link is used as system interconnection in parallel with AC tie-line to effectively damp the frequency oscillations of AC system while the SMES unit provides bulk energy storage and release, thereby achieving combined benefits. The proposed controller satisfies two main objectives, namely, minimum Integral Squared Error of the system output and maximum closed-loop stability of the system. Simulation studies are conducted on a two area interconnected power system with nonlinearities, AC-DC tie-lines and SMES units. Results indicate that the proposed controller improves the transient responses and guarantees the closed-loop stability of the overall system even in the presence of system nonlinearities and with parameter changes.

  17. The number of pickers and stock-keeping unit arrangement on a uni-directional picking line

    Directory of Open Access Journals (Sweden)

    Hagspihl, Robert

    2014-10-01

    Full Text Available The order picking process is often the single largest expense in a distribution centre (DC. The DC considered in this paper uses a picking line configuration to perform order picking. The number of pickers in a picking line, and the initial arrangement of stock-keeping units (SKUs, are two important factors that affect the total completion time of the picking lines. In this paper, the picking line configuration is simulated with an agent-based approach to describe the behaviour of an individual picker. The simulation is then used to analyse the effect of the number of pickers and the SKU arrangement. Verification and validation of this model shows that the model represents the real-world picking line to a satisfactory degree. Marginal analysis (MA was chosen to determine a ‘good’ number of pickers by means of the simulation model. A look-up table is presented to provide decision support for the choice of a ‘good’ number of pickers to improve completion times of the picking line, for the properties of a specific picking line. The initial SKU arrangement on a picking line is shown to be a factor that can affect the level of picker congestion and the total completion time. The greedy ranking and partitioning (GRP and organ pipe arrangement (OPA techniques from the literature, as well as the historical SKU arrangements used by the retailer under consideration, were compared with the proposed classroom discipline heuristic (CDH for SKU arrangement. It was found that the CDH provides an more even spread of SKUs that are picked most frequently, thus decreasing congestion and total completion time.

  18. Enzyme replacement and substrate reduction therapy for Gaucher disease.

    Science.gov (United States)

    Shemesh, Elad; Deroma, Laura; Bembi, Bruno; Deegan, Patrick; Hollak, Carla; Weinreb, Neal J; Cox, Timothy M

    2015-03-27

    untreated individuals with type 1 Gaucher disease. Two studies investigated maintenance enzyme replacement therapy in people with stable type 1 Gaucher disease previously treated for at least two years. One study compared substrate reduction therapy, enzyme replacement therapy and a combination thereof as maintenance therapy in people with type 1 Gaucher disease previously treated with enzyme replacement therapy. One study examined substrate reduction therapy in people with chronic neuronopathic (type 3) Gaucher disease who continued to receive enzyme replacement therapy.Treatment-naïve participants had similar increases in haemoglobin when comparing those receiving imiglucerase or alglucerase at 60 units/kg, imiglucerase or velaglucerase alfa at 60 U/kg, taliglucerase alfa at 30 units/kg or 60 units/kg, and velaglucerase alfa at 45 units/g or 60 units/kg. For platelet count response in participants with intact spleens, a benefit for imiglucerase over velaglucerase alfa at 60 units/kg was observed, mean difference -79.87 (95% confidence interval -137.57 to -22.17). There were no other significant differences in platelet count response when comparing different doses of velaglucerase alfa and of taliglucerase alfa, and when comparing imiglucerase to alglucerase. Spleen and liver volume reductions were not significantly different in any enzyme replacement therapy product or dose comparison study. Although a dose effect on serum biomarkers was not seen after nine months, a significantly greater reduction with higher dose was reported after 12 months in the velaglucerase study, mean difference 16.70 (95% confidence intervaI 1.51 to 31.89). In the two enzyme replacement therapy maintenance studies comparing infusions every two weeks and every four weeks, there were no significant differences in haemoglobin concentration, platelet count, and spleen and liver volumes over a 6 to 12 month period when participants were treated with the same cumulative dose.A total of 25 serious

  19. 49 CFR 192.719 - Transmission lines: Testing of repairs.

    Science.gov (United States)

    2010-10-01

    ... pipe before it is installed. (b) Testing of repairs made by welding. Each repair made by welding in... 49 Transportation 3 2010-10-01 2010-10-01 false Transmission lines: Testing of repairs. 192.719... Transmission lines: Testing of repairs. (a) Testing of replacement pipe. If a segment of transmission line is...

  20. Multistate Outbreak of Salmonella Virchow Infections Linked to a Powdered Meal Replacement Product - United States, 2015-2016.

    Science.gov (United States)

    Gambino-Shirley, Kelly J; Tesfai, Adiam; Schwensohn, Colin A; Burnett, Cindy; Smith, Lori; Wagner, Jennifer M; Eikmeier, Dana; Smith, Kirk; Stone, Jolianne P; Updike, Dawn; Hines, Jonas; Shade, Lauren N; Tolar, Beth; Fu, Tong-Jen; Viazis, Stelios; Seelman, Sharon L; Blackshear, Kathryn; Wise, Matthew E; Neil, Karen P

    2018-03-07

    Nontyphoidal Salmonella is the leading cause of bacterial gastroenteritis in the United States. Meal replacement products containing raw and 'superfood' ingredients have gained increasing popularity among consumers in recent years. In January 2016, we investigated a multistate outbreak of infections with a novel strain of Salmonella Virchow. Cases were defined using molecular subtyping procedures. Commonly reported exposures were compared with responses from healthy people interviewed in the 2006-2007 FoodNet Population Survey. Firm inspections and product traceback and testing were performed. Thirty-five cases from 24 states were identified; 6 hospitalizations and no deaths were reported. Thirty-one (94%) of 33 ill people interviewed reported consuming a powdered supplement in the week before illness; of these, 30 (97%) reported consuming Product A, a raw organic powdered shake product consumed as a meal replacement. Laboratory testing isolated the outbreak strain of Salmonella Virchow from: leftover Product A collected from ill people's homes, organic moringa leaf powder (an ingredient in Product A), and finished product retained by the firm. Firm inspections at three facilities linked to Product A production did not reveal contamination at the facilities. Traceback identified that the contaminated moringa leaf powder was imported from South Africa. This investigation identified a novel outbreak vehicle and highlighted the potential risk with similar products not intended to be cooked by consumers before consuming. The company issued a voluntary recall of all implicated products. As this product has a long shelf-life, the recall likely prevented additional illnesses.

  1. Optimization of steam generator replacement with virtual reality modeling

    International Nuclear Information System (INIS)

    Kim, Jeong H.; Suh, Kune Y.

    2008-01-01

    Nuclear power plants (NPPs) have to be carefully examined and maintained up to the point of replacing major components during the overhaul period for continued operation. Most understandably the cost of maintenance and upgrading will tend to increase with the NPP power. There is thus an escalating need for developing an optimized process management method to reduce the cost involved. Albeit the steam generators (SGs) may not directly affect the expected lifespan of NPP, thousands of tubes with diameter on the order of 3 cm in the SG operating at 320degC and 16 MPa may well tend to be called Achilles' heel of the pressurized water reactors (PWRs). For instance, the SGs of Kori Nuclear Unit 1 (KNU 1) were replaced in October 1998 after 20 years of service on account of aging and potential threat to operational safety. In the same year the SG tubes of Ulchin Nuclear Units 1 and 2 were ruptured to result in leakage of the primary coolant to the secondary side. As a result their SGs are planned to be replaced in a few years. There is, however, a limit to improving the replacement process by trial and error in practice on account of the size of NPP with the ensuing complexity in process management. This paper proposes an optimization method for the SG replacement process based on the KNU 1 experience in 1998. The whole process was simulated accounting for interactions of each part in virtual reality utilizing the computer aided design solution CATIA, and the digital process management solution DELMIA. (author)

  2. Replacement Energy Cost Analysis Package (RECAP): User's guide. Revision 1

    International Nuclear Information System (INIS)

    VanKuiken, J.C.; Willing, D.L.

    1994-07-01

    A microcomputer program called the Replacement Energy Cost Analysis Package (RECAP) has been developed to assist the US Nuclear Regulatory Commission (NRC) in determining the replacement energy costs associated with short-term shutdowns or deratings of one or more nuclear reactors. The calculations are based on the seasonal, unit-specific cost estimates for 1993--1996 previously published in NRC Report NUREG/CR--4012, Vol. 3 (1992), for all 112 US reactors. Because the RECAP program is menu-driven, the user can define specific case studies in terms of such parameters as the units to be included, the length and timing of the shutdown or derating period, the unit capacity factors, and the reference year for reporting cost results. In addition to simultaneous shutdown cases, more complicated situations, such as overlapping shutdown periods or shutdowns that occur in different years, can be examined through the use of a present-worth calculation option

  3. Development of a non-delay-line constant-fraction discriminator

    International Nuclear Information System (INIS)

    Yang Tao; Zhao Bo; Zhang Chi

    2002-01-01

    A Non-Delay-Line Constant-Fraction Discriminator (CFD) timing circuit is introduced. The delay line in the CFD is replaced with a low pass filter in this simplified circuit. The timing resolution of the CFD is better than 150 ps

  4. Solid-State Thyratron Replacement. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Roth, Ian [Diversified Technologies, Inc., Bedford, MA

    2017-12-12

    Under this SBIR, DTI developed a solid-state switch as an alternative to legacy thyratron equipment. Our Phase II objective was to make a solid-state thyratron replacement that would provide equivalent or better performance, much higher reliability (at least a 20 year lifetime, compared to a thyratron’s two-year lifetime) and would sell for ~3x the cost of a thyratron, or less than $40k. We were successful in building a solid-state switch which could reliably function as a thyratron replacement. The unit was designed to directly replace the thyratrons currently being used at SLAC’s Linac Coherent Light Source (LCLS), and was built in a tank that was small enough to fit into the existing thyratron cabinet, providing a true form-fit-function replacement path. We tested the switch at the full operating specifications: 48 kV, 6.3 kA, and 1 µs risetime. We also demonstrated a peak-to-peak pulse jitter of 1.5 ns, which is five times shorter than is typical for thyratrons. This lower jitter would improve the performance of the LCLS beam. The predicted reliability is more than 80 years, which is 40 times greater than a thyratron.

  5. Maintenance service for major component of PWR plant. Replacement of pressurizer safe end weld

    International Nuclear Information System (INIS)

    Miyoshi, Yoshiyuki; Kobayashi, Yuki; Yamamoto, Kazuhide; Ueda, Takeshi; Suda, Naoki; Shintani, Takashi

    2017-01-01

    In October 2016, MHI completed the replacement of safe end weld of pressurizer (Pz) of Ringhals unit 3, which was the first maintenance work for main component of pressurized water reactor (PWR) plant in Europe. For higher reliability and longer lifetime of PWR plant, MHI has conducted many kinds of maintenance works of main components of PWR plants in Japan against stress corrosion cracking due to aging degradation. Technical process for replacement of Pz safe end weld were established by MHI. MHI has experienced the work for 21 PWR units in Japan. That of Ringhals unit 3 was planned and conducted based on the experiences. In this work, Alloy 600 used for welds of nozzles of Pz was replaced with Alloy 690. Alloy 690 is more corrosive-resistant than Alloy 600. Specially designed equipment and technical process were developed and established by MHI to replace safe end weld of Pz and applied for the Ringhals unit 3 as a first application in Europe. The application had been performed in success and achieved the planned replacement work duration and total radiation dose by using sophisticated machining and welding equipment designed to meet the requirements to be small, lightweight and remote-controlled and operating by well skilled MHI personnel experienced in maintenance activities for major components of PWR plant in Japan. The success shows that the experience, activities and technology developed in Japan for main components of PWR plant shall be applicable to contribute reliable operations of nuclear power plants in Europe and other countries. (author)

  6. Feed water distribution pipe replacement at Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Savolainen, S.; Elsing, B. [Imatran Voima Loviisa NPP (Finland)

    1995-12-31

    Imatran Voima Oy operates two WWER-440 reactors. Unit 1 has been operating since 1977 and unit 2 since 1981. First damages of feed water distribution (FWD) pipe were observed in 1989. The FWD-pipe T-connection had suffered from severe erosion corrosion damages. Similar damages have been been found also in other WWER-440 type NPPs. In 1989 the nozzles of the steam generator YB11 were inspected. No signs of the damages or signs of erosion were detected. The first damaged nozzles were found in 1992 in steam generators of both units. In 1992 it was started studying different possibilities to either repair or replace the damaged FWD-pipes. Due to the difficult conditions for repairing the damaged nozzles it was decided to study different FWD-pipe constructions. In 1991 two new feedwater distributors had been implemented at Dukovany NPP designed by Vitckovice company. Additionally OKB Gidropress had presented their design for new collector. In spring 1994 all the six steam generators of Rovno NPP unit 1 were replaced with FWD-pipes designed by OKB Gidropress. After the implementation an experimental program with the new systems was carried out. Due to the successful experiments at Rovno NPP Unit 1 it was decided to implement `Gidropress solution` during 1994 refueling outage into the steam generator YB52 at Loviisa 2. The object of this paper is to discuss the new FWD-pipe and its effects on the plant safety during normal and accident conditions. (orig.).

  7. Feed water distribution pipe replacement at Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Savolainen, S; Elsing, B [Imatran Voima Loviisa NPP (Finland)

    1996-12-31

    Imatran Voima Oy operates two WWER-440 reactors. Unit 1 has been operating since 1977 and unit 2 since 1981. First damages of feed water distribution (FWD) pipe were observed in 1989. The FWD-pipe T-connection had suffered from severe erosion corrosion damages. Similar damages have been been found also in other WWER-440 type NPPs. In 1989 the nozzles of the steam generator YB11 were inspected. No signs of the damages or signs of erosion were detected. The first damaged nozzles were found in 1992 in steam generators of both units. In 1992 it was started studying different possibilities to either repair or replace the damaged FWD-pipes. Due to the difficult conditions for repairing the damaged nozzles it was decided to study different FWD-pipe constructions. In 1991 two new feedwater distributors had been implemented at Dukovany NPP designed by Vitckovice company. Additionally OKB Gidropress had presented their design for new collector. In spring 1994 all the six steam generators of Rovno NPP unit 1 were replaced with FWD-pipes designed by OKB Gidropress. After the implementation an experimental program with the new systems was carried out. Due to the successful experiments at Rovno NPP Unit 1 it was decided to implement `Gidropress solution` during 1994 refueling outage into the steam generator YB52 at Loviisa 2. The object of this paper is to discuss the new FWD-pipe and its effects on the plant safety during normal and accident conditions. (orig.).

  8. An instrumented implant for vertebral body replacement that measures loads in the anterior spinal column.

    Science.gov (United States)

    Rohlmann, Antonius; Gabel, Udo; Graichen, Friedmar; Bender, Alwina; Bergmann, Georg

    2007-06-01

    Realistic loads on a spinal implant are required among others for optimization of implant design and preclinical testing. In addition, such data may help to choose the optimal physiotherapy program for patients with such an implant and to evaluate the efficacy of aids like braces or crutches. Presently, no implant is available that can measure loads in the anterior spinal column during activities of daily life. Therefore, an implant instrumented for in vivo load measurement was developed for vertebral body replacement. The aim of this paper is to describe in detail a telemeterized implant that measures forces and moments acting on it. Six load sensors, a nine-channel telemetry unit and a coil for inductive power supply of the electronic circuits were integrated into a modified vertebral body replacement (Synex). The instrumented part of the implant is hermetically sealed. Patients are videotaped during measurements, and implant loads are displayed on and off line. The average accuracy of load measurement is better than 2% for force and 5% for moment components with reference to the maximum value of 3000 N and 20 Nm, respectively. The measuring implant described here will provide additional information on spinal loads.

  9. Ring thermal shield piping modification at Pickering Nuclear Generating Station 'A' Unit 1

    International Nuclear Information System (INIS)

    Brown, R.; Cobanoglu, M.M.

    1995-01-01

    Each of the four Pickering Nuclear Generating Station A (PNGSA) CANDU units was constructed with its reactor and dump tank surrounded by a concrete Calandria Vault (CV). The Ring Thermal Shield (RTS) system at PNGSA units is a water cooled structure with internal cooling channels with the purpose of attenuating excessive heat flux from the calandria shell to the end shield rings and adjoining concrete (Figure 1). In newer CANDU units the reactor calandria vessel is surrounded by a large water filled shield tank which eliminates the requirement for the RTS system. The RTS structures are situated in the space between the calandria and the vault walls. Each RTS is assembled from eight flat sided carbon steel segments, tilted towards the calandria and supported from the end shield rings. Cooling water to the RTS is supplied by carbon steel cooling pipes with a portion of the pipe run embedded in the vault walls. Flow through each RTS is divided into two independent circuits, having an inlet and an outlet cooling line. There are four locations of RTS inlet and outlet cooling lines. The inlet lines are located at the bottom and the outlet lines at the top of the RTS. The 'L' shaped section of RTS inlet and outlet cooling lines, from the RTS waterbox to the start of embedded portion at the concrete wall, had become defective due to corrosion induced by excessive Moisture levels in the calandria vaults. An on-line leak sealing capability was developed and placed in service in all four PNGSA units. However, a leak found during the 1994 Unit 1 outage was too large,to seal with the current capability, forcing Ontario Hydro (OH) to develop a method to replace the corroded pipes. The repair project was subject to some lofty performance targets. All tools had to be able to withstand dose rates of up to 3000 Rem/hour. These tools, along with procedures and personnel had to successfully repair the RTS system within 6 months otherwise a costly outage extension would result. This

  10. Drinking-water supply system of Arbedo-Castione. Replacement of the main water supply line and installation of a small hydropower plant; Sostituzione condotta adduzione sorgenti in valle d'Arbedo e ricupero energetico. Acquedotto di Arbedo-Castione

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2005-07-01

    This report presents the comparative evaluation of variants for the replacement work of the main drinking-water supply line from the Arbedo valley to the community of Arbedo-Castione, southern Switzerland. Three variants include the installation of a small hydropower plant to take advantage of the elevation difference of 340 m between the location of water collection and the water reservoir. The base case only includes the line replacement. The feasibility study includes both a technical and an economical analysis. The average water flow rate is estimated to 12 l/s. The nominal electrical power would be 25 kW. Power production cost is calculated to about 0.09 Swiss francs/kWh. The author concludes that an optimized variant with small hydropower plant would be the best solution, also from the point of view of environmental aspects.

  11. Fault Lines in Our Democracy: Civic Knowledge, Voting Behavior, and Civic Engagement in the United States. Highlights

    Science.gov (United States)

    Coley, Richard J.; Sum, Andrew

    2012-01-01

    As the 21st century unfolds, the United States faces historic challenges, including a struggling economy, an aging infrastructure and global terrorism. Solutions will have to come from educated, skilled citizens who understand and believe in our democratic system and are civically engaged. This incisive new report examines these fault lines and…

  12. Ultrasonic aqueous cleaning as a replacement for chlorinated solvent cleaning

    International Nuclear Information System (INIS)

    Thompson, L.M.; Simandl, R.F.

    1992-01-01

    The Oak Ridge Y-12 Plant has been involved in the replacement of chlorinated solvents since 1982. One of the most successful replacement efforts has been the substitution of vapor degreasers or soak tanks using chlorinated solvents with ultrasonic cleaning using aqueous detergents. Recently, funding was obtained from the Department of Energy Office (DOE) of Technology Development to demonstrate this technology. A unit has been procured and installed in the vacuum pump shop area to replace the use of a solvent soak tank. Initially, the solvents used in the shop were CFC-113 and a commercial brand cleaner which contained both perchloroethylene and methylene chloride. While the ultrasonic unit was being procured, a terpene-based solvent was used. Generally, parts were soaked overnight in order to soften baked-on vanish. Many times, wire brushing was used to help remove remaining contamination. Initial testing with the ultrasonic cleaner indicated cleaning times of 20 min were as effective as the overnight solvent soaks in removing contamination. Wire brushing was also not required following the ultrasonic cleaning as was sometimes required with the solvent soak

  13. 76 FR 16845 - Administrator's Line of Succession Designation, No. 1-A, Revision 32

    Science.gov (United States)

    2011-03-25

    ... SMALL BUSINESS ADMINISTRATION Administrator's Line of Succession Designation, No. 1-A, Revision 32 This document replaces and supersedes ``Line of Succession Designation No. 1-A, Revision 31.'' Line of Succession Designation No. 1-A, Revision 32 Effective immediately, the Administrator's Line of Succession...

  14. 77 FR 44305 - Administrator's Line of Succession Designation, No. 1-A, Revision 34

    Science.gov (United States)

    2012-07-27

    ... SMALL BUSINESS ADMINISTRATION Administrator's Line of Succession Designation, No. 1-A, Revision 34 This document replaces and supersedes ``Line of Succession Designation No. 1-A, Revision 33.'' Line of Succession Designation No. 1-A, Revision 34: Effective immediately, the Administrator's Line of Succession...

  15. 77 FR 20474 - Administrator's Line of Succession Designation, No. 1-A, Revision 33

    Science.gov (United States)

    2012-04-04

    ... SMALL BUSINESS ADMINISTRATION Administrator's Line of Succession Designation, No. 1-A, Revision 33 This document replaces and supersedes ``Line of Succession Designation No. 1-A, Revision 32.'' Line of Succession Designation No. 1-A, Revision 33: Effective immediately, the Administrator's Line of Succession...

  16. Prioritization methodology for chemical replacement

    Science.gov (United States)

    Cruit, Wendy; Goldberg, Ben; Schutzenhofer, Scott

    1995-01-01

    Since United States of America federal legislation has required ozone depleting chemicals (class 1 & 2) to be banned from production, The National Aeronautics and Space Administration (NASA) and industry have been required to find other chemicals and methods to replace these target chemicals. This project was initiated as a development of a prioritization methodology suitable for assessing and ranking existing processes for replacement 'urgency.' The methodology was produced in the form of a workbook (NASA Technical Paper 3421). The final workbook contains two tools, one for evaluation and one for prioritization. The two tools are interconnected in that they were developed from one central theme - chemical replacement due to imposed laws and regulations. This workbook provides matrices, detailed explanations of how to use them, and a detailed methodology for prioritization of replacement technology. The main objective is to provide a GUIDELINE to help direct the research for replacement technology. The approach for prioritization called for a system which would result in a numerical rating for the chemicals and processes being assessed. A Quality Function Deployment (QFD) technique was used in order to determine numerical values which would correspond to the concerns raised and their respective importance to the process. This workbook defines the approach and the application of the QFD matrix. This technique: (1) provides a standard database for technology that can be easily reviewed, and (2) provides a standard format for information when requesting resources for further research for chemical replacement technology. Originally, this workbook was to be used for Class 1 and Class 2 chemicals, but it was specifically designed to be flexible enough to be used for any chemical used in a process (if the chemical and/or process needs to be replaced). The methodology consists of comparison matrices (and the smaller comparison components) which allow replacement technology

  17. Design and performance of BWC replacement steam generators for PWR systems

    International Nuclear Information System (INIS)

    Klarner, R.; Steinmoeller, F.; Millman, J.; Schneider, W.

    1998-01-01

    In recent years, Babcock and Wilcox Canada (BWC) has provided a number of PWR Replacement Steam Generators (RSGS) to replace units that had experienced extensive Alloy 600 tube degradation. BWC RSG units are in operation at Northeast Utilities' Millstone Unit 2, Rochester Gas and Electric's Ginna Station, Duke Energy's Catawba Unit 1, McGuire Unit 1 and 2, Florida Power and Light's St. Lucie Unit 1 and Commonwealth Edison's Byron 1 Station. Extensive start-up performance characteristics have been obtained for Millstone 2, Ginna, McGuire 1, and Catawba 1 RSGS. The Millstone 2, Ginna and Catawba 1 RSGs have also undergone extensive inspections following their first cycle of operation. The design and start-up performance characteristics of these RSGs are presented. The BWC Replacement Steam generators were designed to fit the existing envelope of pressure boundary dimensions to ensure licensability and integration into the Nuclear Steam Supply System. The RSGs were provided with a tube bundle of Alloy 690TT tubing, sized to match or exceed the original steam generator (OSG) thermal performance including provision for the reduced thermal conductivity of Alloy 690 relative to Alloy 600. The RSG tube bundle configurations provide a higher circulation design relative to the OSG, and feature corrosion resistant lattice grid and U-bend tube supports which provide effective anti-vibration support. The tube bundle supports accommodate relatively unobstructed flow and allow unrestrained structural interactions during thermal transients. Efficient steam separators assure low moisture carryover as well as high circulation. Performance measurements obtained during start-up verify that the BWC RSGs meet or exceed the specified thermal and moisture carryover performance requirements. RSG water level stability results at nor-mal operation and during plant transients have been excellent. Visual and ECT inspections have confirmed minimal deposition and 100% tube integrity following

  18. β-Cell Replacement in Mice Using Human Type 1 Diabetes Nuclear Transfer Embryonic Stem Cells.

    Science.gov (United States)

    Sui, Lina; Danzl, Nichole; Campbell, Sean R; Viola, Ryan; Williams, Damian; Xing, Yuan; Wang, Yong; Phillips, Neil; Poffenberger, Greg; Johannesson, Bjarki; Oberholzer, Jose; Powers, Alvin C; Leibel, Rudolph L; Chen, Xiaojuan; Sykes, Megan; Egli, Dieter

    2018-01-01

    β-Cells derived from stem cells hold great promise for cell replacement therapy for diabetes. Here we examine the ability of nuclear transfer embryonic stem cells (NT-ESs) derived from a patient with type 1 diabetes to differentiate into β-cells and provide a source of autologous islets for cell replacement. NT-ESs differentiate in vitro with an average efficiency of 55% into C-peptide-positive cells, expressing markers of mature β-cells, including MAFA and NKX6.1. Upon transplantation in immunodeficient mice, grafted cells form vascularized islet-like structures containing MAFA/C-peptide-positive cells. These β-cells adapt insulin secretion to ambient metabolite status and show normal insulin processing. Importantly, NT-ES-β-cells maintain normal blood glucose levels after ablation of the mouse endogenous β-cells. Cystic structures, but no teratomas, were observed in NT-ES-β-cell grafts. Isogenic induced pluripotent stem cell lines showed greater variability in β-cell differentiation. Even though different methods of somatic cell reprogramming result in stem cell lines that are molecularly indistinguishable, full differentiation competence is more common in ES cell lines than in induced pluripotent stem cell lines. These results demonstrate the suitability of NT-ES-β-cells for cell replacement for type 1 diabetes and provide proof of principle for therapeutic cloning combined with cell therapy. © 2017 by the American Diabetes Association.

  19. New Generation General Purpose Computer (GPC) compact IBM unit

    Science.gov (United States)

    1991-01-01

    New Generation General Purpose Computer (GPC) compact IBM unit replaces a two-unit earlier generation computer. The new IBM unit is documented in table top views alone (S91-26867, S91-26868), with the onboard equipment it supports including the flight deck CRT screen and keypad (S91-26866), and next to the two earlier versions it replaces (S91-26869).

  20. Delay in onset of metabolic alkalosis during regional citrate anti-coagulation in continous renal replacement therapy with calcium-free replacement solution

    Directory of Open Access Journals (Sweden)

    See Kay

    2009-01-01

    Full Text Available Regional citrate anti-coagulation for continuous renal replacement therapy chelates calcium to produce the anti- coagulation effect. We hypothesise that a calcium-free replacement solution will require less citrate and produce fewer metabolic side effects. Fifty patients, in a Medical Intensive Care Unit of a tertiary teaching hospital (25 in each group, received continuous venovenous hemofiltration using either calcium-containing or calcium-free replacement solutions. Both groups had no significant differences in filter life, metabolic alkalosis, hypernatremia, hypocalcemia, and hypercalcemia. However, patients using calcium-containing solution developed metabolic alkalosis earlier, compared to patients using calcium-free solution (mean 24.6 hours,CI 0.8-48.4 vs. 37.2 hours, CI 9.4-65, P = 0.020. When calcium-containing replacement solution was used, more citrate was required (mean 280ml/h, CI 227.2-332.8 vs. 265ml/h, CI 203.4-326.6, P = 0.069, but less calcium was infused (mean 21.2 ml/h, CI 1.2-21.2 vs 51.6ml/h, CI 26.8-76.4, P ≤ 0.0001.

  1. Installation technology of reactor internals on shroud replacement work

    International Nuclear Information System (INIS)

    Miyano, Hiroshi

    1999-01-01

    Since the replacement of large welded reactor internals much as a core shroud did not have a precedent in the world, quite a few technologies had to be developed. Especially for the installation of new core shroud, jet pumps, core plate and top guide, the accurate weld and fit-up techniques for large structures was required to secure their integrity. The vessel shielding system was utilized to reduce general area dose rate such that all replacement work. For jet pump installation, automatic remote welding machines were used for high radiation area. As for the core shroud, shroud support weld prep machining tool with high accuracy, jacking system to support fit-up, new weld machine for small work space and low heat input weld joint were developed. Shroud replacement work in Fukushima Dai-ichi NPS Unit 3 (1F-3) with application of these development techniques, was successfully accomplished. The technology is applied for 1F-2 replacement work also. (author)

  2. RECAP, Replacement Energy Cost for Short-Term Reactor Plant Shut-Down

    International Nuclear Information System (INIS)

    VanKuiken, J.C.; Daun, C.J.; Jusko, M.J.

    1995-01-01

    1 - Description of program or function: RECAP (Replacement Energy Cost Analysis Package) determines the replacement energy costs associated with short-term shutdowns or de-ratings of one or more nuclear reactors. Replacement energy cost refers to the change in generating-system production cost that results from shutting down a reactor. The cost calculations are based on the seasonal, unit-specific cost estimates for 1988-1991 for all 117 nuclear electricity-generating units in the U.S. RECAP is menu-driven, allowing the user to define specific case studies in terms of parameters such as the units to be included, the length and timing of the shutdown or de-rating period, the unit capacity factors, and the reference year for reporting cost results. In addition to simultaneous shutdown cases, more complicated situations, such as overlapping shutdown periods or shutdowns that occur in different years, can be examined through use of a present-worth calculation option. 2 - Method of solution: The user selects a set of units for analysis, defines a shutdown (or de-rating) period, and specifies any planned maintenance outages, delays in unit start-ups, or changes in default capacity factors. The program then determines which seasonal cost numbers to apply, estimates total and daily costs, and makes the appropriate adjustments for multiple outages if they are encountered. The change in production cost is determined from the difference between the total variable costs (variable fuel cost, variable operation and maintenance cost, and purchased energy cost) when the reactor is available for generation and when it is not. Changes in reference-year dollars are based on gross national product (GNP) price deflators or on optional use inputs. Once RECAP has completed the initial cost estimates for a case study (or series of case studies), present-worth analysis can be conducted using different reference-year dollars and discount rates, as specified by the user. The program uses

  3. Similarity law for Widom lines and coexistence lines.

    Science.gov (United States)

    Banuti, D T; Raju, M; Ihme, M

    2017-05-01

    The coexistence line of a fluid separates liquid and gaseous states at subcritical pressures, ending at the critical point. Only recently, it became clear that the supercritical state space can likewise be divided into regions with liquidlike and gaslike properties, separated by an extension to the coexistence line. This crossover line is commonly referred to as the Widom line, and is characterized by large changes in density or enthalpy, manifesting as maxima in the thermodynamic response functions. Thus, a reliable representation of the coexistence line and the Widom line is important for sub- and supercritical applications that depend on an accurate prediction of fluid properties. While it is known for subcritical pressures that nondimensionalization with the respective species critical pressures p_{cr} and temperatures T_{cr} only collapses coexistence line data for simple fluids, this approach is used for Widom lines of all fluids. However, we show here that the Widom line does not adhere to the corresponding states principle, but instead to the extended corresponding states principle. We resolve this problem in two steps. First, we propose a Widom line functional based on the Clapeyron equation and derive an analytical, species specific expression for the only parameter from the Soave-Redlich-Kwong equation of state. This parameter is a function of the acentric factor ω and compares well with experimental data. Second, we introduce the scaled reduced pressure p_{r}^{*} to replace the previously used reduced pressure p_{r}=p/p_{cr}. We show that p_{r}^{*} is a function of the acentric factor only and can thus be readily determined from fluid property tables. It collapses both subcritical coexistence line and supercritical Widom line data over a wide range of species with acentric factors ranging from -0.38 (helium) to 0.34 (water), including alkanes up to n-hexane. By using p_{r}^{*}, the extended corresponding states principle can be applied within

  4. Dynamic Line Rating - Technologies and Challenges of PMU on Overhead Lines

    DEFF Research Database (Denmark)

    Alvarez, David; Rosero, Javier; Silva, Filipe Miguel Faria da

    2016-01-01

    for line rating computation and monitoring are identified, these are: sensors, communications, management information system and information analysis tools, which are part of integral dynamic line rating systems. Finally, the benefits and challenges of using phasor measurement units for real time capacity...

  5. Development of a tilting system for electric multiple unit to speed up on conventional lines

    International Nuclear Information System (INIS)

    Seo, Sung Il; Kim, Nam Po; Lee, Soo Gil; Kim, Seok Won

    2008-01-01

    An advanced tilting system for KTT (Korean Tilting Train) was developed and a performance test of the system has been completed. KTT has been constructed to speed up and promise a significant enhancement in service quality on a conventional line. KTT is an electric multiple unit composed of 6 cars running at the design speed of 200 km/h. The tilting system is the core technology of KTT and combined with the conventional bogie system. It has a self-steering mechanism and a swing link. The self-steering mechanism of Z-bar type is free to rotate on the curve and stable to run on a straight line. The swing link mechanism of the bolster enables the carbody to tilt up to 8 .deg.. A tilting control system detects a curve with sensors and commands the electro-mechanical actuators to move the bolster through the computer network system. GPS collaborates with the tilting system to perceive the curve previously and enables gradual tilting so as not to violate passenger comfort. The performance of the tilting system has been verified by a trial test running of KTT on a commercial conventional line. The tilting system is ready for commercial use

  6. Optimization of line configuration and balancing for flexible machining lines

    Science.gov (United States)

    Liu, Xuemei; Li, Aiping; Chen, Zurui

    2016-05-01

    Line configuration and balancing is to select the type of line and allot a given set of operations as well as machines to a sequence of workstations to realize high-efficiency production. Most of the current researches for machining line configuration and balancing problems are related to dedicated transfer lines with dedicated machine workstations. With growing trends towards great product variety and fluctuations in market demand, dedicated transfer lines are being replaced with flexible machining line composed of identical CNC machines. This paper deals with the line configuration and balancing problem for flexible machining lines. The objective is to assign operations to workstations and find the sequence of execution, specify the number of machines in each workstation while minimizing the line cycle time and total number of machines. This problem is subject to precedence, clustering, accessibility and capacity constraints among the features, operations, setups and workstations. The mathematical model and heuristic algorithm based on feature group strategy and polychromatic sets theory are presented to find an optimal solution. The feature group strategy and polychromatic sets theory are used to establish constraint model. A heuristic operations sequencing and assignment algorithm is given. An industrial case study is carried out, and multiple optimal solutions in different line configurations are obtained. The case studying results show that the solutions with shorter cycle time and higher line balancing rate demonstrate the feasibility and effectiveness of the proposed algorithm. This research proposes a heuristic line configuration and balancing algorithm based on feature group strategy and polychromatic sets theory which is able to provide better solutions while achieving an improvement in computing time.

  7. Unit Manning

    National Research Council Canada - National Science Library

    McGinniss, Mike

    2003-01-01

    .... This decision combines two crucial initiatives: first, transforming the Army from an individual soldier replacement system to a unit manning system that enhances cohesion and keeps trained soldiers, leaders, and commanders together longer, thereby...

  8. Long-Term Survival of Dialysis Patients with Bacterial Endocarditis Undergoing Valvular Replacement Surgery in the United States

    Science.gov (United States)

    Leither, Maxwell D.; Shroff, Gautam R.; Ding, Shu; Gilbertson, David T.; Herzog, Charles A.

    2013-01-01

    Background Bacterial endocarditis in dialysis patients is associated with high mortality rates. The literature is limited regarding long-term outcomes of valvular replacement surgery and choice of prosthesis in dialysis patients with bacterial endocarditis. Methods and Results Dialysis patients hospitalized for bacterial endocarditis, 2004-2007, were studied retrospectively using data from the US Renal Data System. Long-term survival of patients undergoing valve replacement surgery with tissue or non-tissue valves was compared using the Kaplan-Meier method. A Cox proportional hazards model was used to identify independent predictors of mortality in patients undergoing valvular replacement surgery. During the study period, 11,156 dialysis patients were hospitalized for bacterial endocarditis and 1267 (11.4%) underwent valvular replacement surgery (tissue valve 44.3%, non-tissue valve 55.7%). In the valve replacement cohort, 60% were men, 50% white, 54% aged 45-64 years, and 36% diabetic. Estimated survival with tissue and non-tissue valves, respectively, at 0.5, 1, 2, and 3 years was 59% and 60%, 48% and 50%, 35% and 37%, and 25% and 30% (log rank P = 0.42). Staphylococcus was the predominant organism (66% of identified organisms). Independent predictors of mortality in patients undergoing valve replacement surgery included older age, diabetes as cause of end-stage renal disease, surgery during index hospitalization, staphylococcus as the causative organism, and dysrhythmias as a comorbid condition. Conclusions Valve replacement surgery is appropriate for well-selected dialysis patients with bacterial endocarditis, but is associated with high mortality rates. Survival does not differ with tissue or non-tissue prosthesis. PMID:23785002

  9. SI units in radiology

    Energy Technology Data Exchange (ETDEWEB)

    Iyer, P S [Bhabha Atomic Research Centre, Bombay (India). Div. of Radiation Protection

    1978-11-01

    The proposal of the International Commission on Radiation Units and Measurements that the special units of radiation and radioactivity-roentgen, rad, rem and curie-be replaced by the International System (SI) of Units has been accepted by international bodies. This paper reviews the resons for introducing the new units and their features. The relation between the special units and the corresponding SI units is discussed with examples. In spite of anticipated difficulties, the commission recommends a smooth and efficient changeover to the SI units in ten years.

  10. Experience and development of on-line BWR surveillance system at Onagawa nuclear power station unit-1

    International Nuclear Information System (INIS)

    Kishi, A.; Chiba, K.; Kato, K.; Ebata, S.; Ando, Y.; Sakamoto, H.

    1986-01-01

    ONAGAWA nuclear power station Unit-1 (Tohoku Electric Power Co.) is a BWR-4 nuclear power station of 524 MW electric power which started commercial operation in June 1984. To attain high reliability and applicability for ONAGAWA-1, Tohoku Electric Power Co. and Toshiba started a Research and Development project on plant surveillance and diagnosis from April 1982. Main purposes of this project are to: (1) Develop an on-line surveillance system and acquire its operating experience at a commercial BWR, (2) Assist in plant operation and maintenance by data acquisition and analysis, (3) Develop a new technique for plant surveillance and diagnosis. An outline of the project, operating experience gained from the on-line surveillance system and an introduction to new diagnosis techniques are reported in this paper. (author)

  11. Development of a Handheld Line Information Reader and Generator for Efficient Management of Optical Communication Lines.

    Science.gov (United States)

    Lee, Jaeyul; Kwon, Hyungwoo; Song, Jaewon; Jeon, Mansik; Kim, Jeehyun

    2017-08-24

    A handheld line information reader and a line information generator were developed for the efficient management of optical communication lines. The line information reader consists of a photo diode, trans-impedance amplifier, voltage amplifier, microcontroller unit, display panel, and communication modules. The line information generator consists of a laser diode, laser driving circuits, microcontroller unit, and communication modules. The line information reader can detect the optical radiation field of the test line by bending the optical fiber. To enhance the sensitivity of the line information reader, an additional lens was used with a focal length of 4.51 mm. Moreover, the simulation results obtained through BeamPROP ® software from Synopsys, Inc. demonstrated a stronger optical radiation field of the fiber due to a longer transmission wavelength and larger bending angle of the fiber. Therefore, the developed devices can be considered as useful tools for the efficient management of optical communication lines.

  12. ON-BOARD MONITORING OF TECHNICAL STATE FOR POWER UNITS OF WHEELED AND TRACKED VEHICLES

    Directory of Open Access Journals (Sweden)

    Yu. D. Karpievich

    2016-01-01

    Full Text Available The paper considers new methodologies pertaining to on-board diagnosis of wear-out rate for friction linings of a clutch driven disk and friction discs of a hydraulic press clutch of transmission gear boxes which are based on physical process that uses friction work as an integrated indicator. A new methodology in determination of life-span rate for engine oil has been developed in the paper. The paper presents block schematic diagrams for on-board monitoring of technical state for power units of wheeled and tracked vehicles. Usage of friction work as an integrated indicator for determination of wear-out rate for friction linings of clutch driven disk and friction discs of a haydraulic press clutch makes it possible timely at any operational period of wheeled and tracked vehicles to determine their residual operation life and forecast their replacement.While taking volume of the used fuel for determination of engine oil life-span rate it permits quickly and effectively at any operational period of wheeled and tracked vehicles to determine residual useful life of the engine oil and also forecast its replacement.

  13. White thrombus formation in blood tubing lines in a chronic hemodialysis unit.

    Science.gov (United States)

    Watnick, Suzanne; Stooksbury, Michael; Winter, Rolf; Riscoe, Michael; Cohen, David M

    2008-03-01

    Previous reports have described white particulate matter in banked blood components, but no prior public reports describe such matter in blood tubing during the course of routine in-center hemodialysis. This report describes the events, investigations, and preliminary conclusions associated with the spontaneous formation of adherent white thrombus in the venous and arterial blood lines during routine in-center hemodialysis treatments. Design setting, participants, & measurements: This investigation occurred at the Portland Veterans Administration Medical Center (PVAMC) Hemodialysis Unit from October 2006 through April 2007. Sixty-eight variables regarding demographics, medical history and dialysis treatments were collected on our 34 chronic hemodialysis outpatients. Over a 5-wk interval, 62% (21 of 34) of the chronic hemodialysis patients unexpectedly developed a white precipitate adhering to the lumenal surface of their dialysis blood tubing, with 73 of 580 chronic dialysis treatments exhibiting the phenomenon. Microscopic and biochemical analyses were consistent with white thrombus, formed by an aggregation of platelets and fibrin. An alert was issued and other in-center hemodialysis units noted similar findings. This was remedied by the removal of specific tubing. Both patient-specific and tubing-specific factors may have been operative. Although patient safety was not adversely affected, assessment of clinical and manufacturing variables potentially affecting platelet activation is warranted.

  14. Optimal replacement policy of products with repair-cost threshold after the extended warranty

    Institute of Scientific and Technical Information of China (English)

    Lijun Shang; Zhiqiang Cai

    2017-01-01

    The reliability of the product sold under a warranty is usually maintained by the manufacturer during the warranty period. After the expiry of the warranty, however, the consumer confronts a problem about how to maintain the reliability of the product. This paper proposes, from the consumer's perspective, a replace-ment policy after the extended warranty, under the assumption that the product is sold under the renewable free replacement warranty (RFRW) policy in which the replacement is dependent on the repair-cost threshold. The proposed replacement policy is the replacement after the extended warranty is performed by the consumer based on the repair-cost threshold or preventive replacement (PR) age, which are decision variables. The expected cost rate model is derived from the consumer's perspective. The existence and uniqueness of the optimal solution that minimizes the expected cost rate per unit time are offered. Finally, a numeri-cal example is presented to exemplify the proposed model.

  15. Hip joint replacement

    Science.gov (United States)

    Hip arthroplasty; Total hip replacement; Hip hemiarthroplasty; Arthritis - hip replacement; Osteoarthritis - hip replacement ... Your hip joint is made up of 2 major parts. One or both parts may be replaced during surgery: ...

  16. Replacing the Engine In Your Car While You Are Still Driving It

    Energy Technology Data Exchange (ETDEWEB)

    Bjorklund, Eric A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-11-04

    Replacing your accelerator’s timing system with a completely different architecture is not something that happens very often. Perhaps even rarer is the requirement that the replacement not interfere with the accelerator’s normal operational cycle. In 2011, The Los Alamos Neutron Science Center (LANSCE) began the purchasing and installation phase of a nine-year rolling upgrade project which will eventually result in the complete replacement of the low-level RF system, the timing system, the industrial I/O system, the beam-synchronized data acquisition system, the fastprotect reporting system, and much of the diagnostic equipment. These projects are mostly independent of each other, with their own installation schedules, priorities, and time-lines. All of them, however, must interface with the timing system.

  17. Patellofemoral Joint Replacement and Nickel Allergy: An Unusual Presentation

    Directory of Open Access Journals (Sweden)

    Farhan Syed

    2015-01-01

    Full Text Available Metal allergy is an unusual complication of joint replacement that may cause aseptic loosening and necessitate joint revision surgery. We present the case of nickel allergy causing aseptic loosening following patellofemoral joint replacement (PFJR in a 54-year-old male. Joint revision surgery to a nickel-free total knee replacement was performed with good results. Our literature review shows that there is no evidence to guide the management of metal allergy in PFJR. The evidence from studies of total knee replacement is limited to retrospective case series and case reports and gives contradictory recommendations. The optimal management strategy for metal allergy in PFJR is not clear. We recommend allergy testing in patients with history of metal allergy and use of an allergen-free implant in those with positive tests. As there is no gold standard test to establish metal allergy, the choice of test should be guided by availability and recommendation from the local unit of dermatology and allergy testing. We recommend investigation for metal allergy in patients with implant loosening where other causes have been excluded.

  18. Optimization of costs for the DOEL 3 steam generator replacement

    International Nuclear Information System (INIS)

    Leblois, C.

    1994-01-01

    Several aspects of steam generator replacement economics are discussed on the basis of the recent replacement carried out in the Doel 3 unit. The choice between repair of replacement policies, as well as the selection of the intervention date were based on a comparison of costs in which various possible scenarios were examined. The contractual approach for the different works to be performed was also an important point, as well as the project organization in which CAD played an important role. This organization allowed to optimize the outage duration and to realize numerous interventions in the reactor building in parallel with the replacement itself. A last aspect of the optimization of costs is the possibility to uprate the plant power. In the case of Doel 3, the plant restarted with a nominal power increased by 10%, of which 5,7% were possible by the increase of the SG heat transfer area. (Author) 6 refs

  19. Maintenance or replacement of primary equipments

    International Nuclear Information System (INIS)

    Branchu, J.

    1995-01-01

    The principal materials, such as the primary equipments of a PWR type steam generator, have a finite service life. Framatome, builder of steam generators and maintenance contractor of Electricite de France has developed a methodology for the maintenance or the replacement of primary equipments. The paper describes the methodology followed by Framatome to identify and localize the wear mode and to treat or repair the component. Four failure modes have been considered: crack propagation, rubbing/vibration wear, neutron irradiation and corrosion propagation under permanent stress. A kinetic modelling of wear propagation has been computerized and validated using mechanical tests on Inconel 600 mockups. These analyses have allow to determine the strategy of repair or replacement of vessel heads for each unit. The method is evaluated taking into account the risk assessment, cost, dosimetry, efficiency and time delay involved. (J.S.). 1 fig., 3 photos

  20. Design and performance of BWC replacement steam generators for PWR systems

    Energy Technology Data Exchange (ETDEWEB)

    Klarner, R.; Steinmoeller, F.; Millman, J.; Schneider, W. [Babcock and Wilcox Canada, Cambridge, Ontario (Canada)

    1998-07-01

    In recent years, Babcock and Wilcox Canada (BWC) has provided a number of PWR Replacement Steam Generators (RSGS) to replace units that had experienced extensive Alloy 600 tube degradation. BWC RSG units are in operation at Northeast Utilities' Millstone Unit 2, Rochester Gas and Electric's Ginna Station, Duke Energy's Catawba Unit 1, McGuire Unit 1 and 2, Florida Power and Light's St. Lucie Unit 1 and Commonwealth Edison's Byron 1 Station. Extensive start-up performance characteristics have been obtained for Millstone 2, Ginna, McGuire 1, and Catawba 1 RSGS. The Millstone 2, Ginna and Catawba 1 RSGs have also undergone extensive inspections following their first cycle of operation. The design and start-up performance characteristics of these RSGs are presented. The BWC Replacement Steam generators were designed to fit the existing envelope of pressure boundary dimensions to ensure licensability and integration into the Nuclear Steam Supply System. The RSGs were provided with a tube bundle of Alloy 690TT tubing, sized to match or exceed the original steam generator (OSG) thermal performance including provision for the reduced thermal conductivity of Alloy 690 relative to Alloy 600. The RSG tube bundle configurations provide a higher circulation design relative to the OSG, and feature corrosion resistant lattice grid and U-bend tube supports which provide effective anti-vibration support. The tube bundle supports accommodate relatively unobstructed flow and allow unrestrained structural interactions during thermal transients. Efficient steam separators assure low moisture carryover as well as high circulation. Performance measurements obtained during start-up verify that the BWC RSGs meet or exceed the specified thermal and moisture carryover performance requirements. RSG water level stability results at nor-mal operation and during plant transients have been excellent. Visual and ECT inspections have confirmed minimal deposition and 100

  1. Final Environmental Assessment, Horse Creek Bridge Replacement

    Science.gov (United States)

    2010-10-01

    existing bridge pipes that have failed and replace the failed structure with a new, prefabricated pedestrian bridge within the original bridge footprint...vehicles, nor designed for support of standard passenger vehicle loads. The bridge would be a single prefabricated unit consisting of a steel grate...placed on new concrete abutments built on the existing foundations on the creek banks, and put in place by a crane operating from the vehicle parking

  2. ITER PF6 double pancakes winding line

    Energy Technology Data Exchange (ETDEWEB)

    Du, Shuangsong [Institute of Plasma Physics, Chinese Academy of Science, Hefei (China); University of Science and Technology of China, Hefei (China); Wen, Wei, E-mail: wenwei@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Science, Hefei (China); Chen, Jin; Wu, Weiyue; Song, Yuntao; Shen, Guang [Institute of Plasma Physics, Chinese Academy of Science, Hefei (China)

    2017-03-15

    Highlights: • ITER PF6 double pancakes “two-in-hand” winding line layout and main parameters were introduced, main winding sequences were also included. • Main features of each winding unit include de-spooling unit, straightening unit, sandblasting and cleaning unit, bending unit, turn insulation wrapping head, rotary table and automatic control system were depicted. • PF6 double pancake winding line was commissioned with PF5 empty jacket conductor after the installation and testing of each unit, ±0.5 mm turn positioning and ±2 turn to turn deviations were achieved. - Abstract: The Poloidal Field (PF) coils are one of the main sub-systems of the ITER magnets. The PF6 coil is being manufactured by the Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP) as per the Poloidal Field coils cooperation agreement signed between ASIPP and Fusion for Energy (F4E).The ITER PF6 winding pack is composed by stacking of 9 double pancakes. Each double pancake is wound with a “two-in-hand” configuration. This paper describes the ITER PF6 double pancakes winding line, including layout and main parameters of the winding line, features of main units and the commissioning trial with PF5 empty jacket conductor.

  3. Shoulder replacement - discharge

    Science.gov (United States)

    Total shoulder arthroplasty - discharge; Endoprosthetic shoulder replacement - discharge; Partial shoulder replacement - discharge; Partial shoulder arthroplasty - discharge; Replacement - shoulder - discharge; Arthroplasty - shoulder - discharge

  4. Replacing penalties

    Directory of Open Access Journals (Sweden)

    Vitaly Stepashin

    2017-01-01

    Full Text Available УДК 343.24The subject. The article deals with the problem of the use of "substitute" penalties.The purpose of the article is to identify criminal and legal criteria for: selecting the replacement punishment; proportionality replacement leave punishment to others (the formalization of replacement; actually increasing the punishment (worsening of legal situation of the convicted.Methodology.The author uses the method of analysis and synthesis, formal legal method.Results. Replacing the punishment more severe as a result of malicious evasion from serving accused designated penalty requires the optimization of the following areas: 1 the selection of a substitute punishment; 2 replacement of proportionality is serving a sentence other (formalization of replacement; 3 ensuring the actual toughening penalties (deterioration of the legal status of the convict. It is important that the first two requirements pro-vide savings of repression in the implementation of the replacement of one form of punishment to others.Replacement of punishment on their own do not have any specifics. However, it is necessary to compare them with the contents of the punishment, which the convict from serving maliciously evaded. First, substitute the punishment should assume a more significant range of restrictions and deprivation of certain rights of the convict. Second, the perfor-mance characteristics of order substitute the punishment should assume guarantee imple-mentation of the new measures.With regard to replacing all forms of punishment are set significant limitations in the application that, in some cases, eliminates the possibility of replacement of the sentence, from serving where there has been willful evasion, a stricter measure of state coercion. It is important in the context of the topic and the possibility of a sentence of imprisonment as a substitute punishment in cases where the original purpose of the strict measures excluded. It is noteworthy that the

  5. 77 FR 38124 - Inspector General; Line of Succession Designation, No. 23-C, Revision 5

    Science.gov (United States)

    2012-06-26

    ... SMALL BUSINESS ADMINISTRATION Inspector General; Line of Succession Designation, No. 23-C, Revision 5 This document replaces and supersedes ``Delegation of Authority and Line of Succession No. 23-C, Revision 4.'' Line of Succession Designation, No. 23-C, Revision 5: Effective immediately, the Inspector...

  6. Restart Testing Program for piping following steam generator replacement at North Anna Unit 1

    International Nuclear Information System (INIS)

    Bain, R.A.; Bayer, R.K.

    1993-01-01

    In order to provide assurance that the effects of performing steam generator replacement (SGR) at North Anna unit 1 had no adverse impact on plant piping systems, a cold functional verification restart testing program was developed. This restart testing program was implemented in lieu of a hot functional testing program normally used during the initial startup of a nuclear plant. A review of North Anna plant-specific and generic U.S. Nuclear Regulatory Commission requirements for restart testing was performed to ensure that no mandatory hot functional testing was required. This was determined to be the case, and the development of a cold functional test program was initiated. The cold functional test had inherent advantages as compared to the hot functional testing, while still providing assurance of piping system adequacy. The advantages of the cold verification program included reducing risk to personnel from hot piping, increasing the accuracy of measurements with the improvement in work conditions, eliminating engineering activities during the heatup process, and being able to record measurements as construction work was completed allowing for rework or repair of components if required. To ensure the effectiveness of the cold verification program, a project procedure was generated to identify the personnel, equipment, and measurement requirements. An engineering calculation was issued to document the scope of the restart test program, and an additional calculation was developed to provide acceptance criteria for the critical commodity measurements

  7. Solving structures of protein complexes by molecular replacement with Phaser

    International Nuclear Information System (INIS)

    McCoy, Airlie J.

    2006-01-01

    Four case studies in using maximum-likelihood molecular replacement, as implemented in the program Phaser, to solve structures of protein complexes are described. Molecular replacement (MR) generally becomes more difficult as the number of components in the asymmetric unit requiring separate MR models (i.e. the dimensionality of the search) increases. When the proportion of the total scattering contributed by each search component is small, the signal in the search for each component in isolation is weak or non-existent. Maximum-likelihood MR functions enable complex asymmetric units to be built up from individual components with a ‘tree search with pruning’ approach. This method, as implemented in the automated search procedure of the program Phaser, has been very successful in solving many previously intractable MR problems. However, there are a number of cases in which the automated search procedure of Phaser is suboptimal or encounters difficulties. These include cases where there are a large number of copies of the same component in the asymmetric unit or where the components of the asymmetric unit have greatly varying B factors. Two case studies are presented to illustrate how Phaser can be used to best advantage in the standard ‘automated MR’ mode and two case studies are used to show how to modify the automated search strategy for problematic cases

  8. Applied methodology for replacement pipe arcs in integral pipelines TE 'Oslomej'

    Directory of Open Access Journals (Sweden)

    Temelkoska Bratica K.

    2016-01-01

    Full Text Available The integral pipelines in thermal power plants present a linear spatial bearing construction with high operating parameters, complex static and dynamic load. The integral pipelines along its entire length are hanging on construction spring hangers from the boiler building, where the boiler is placed, next to the machine hall where the turbine is placed. Therefore, it is important to monitor the condition and to remove any possible defects from the applied methods. This paper describes the methodology of replacement of the pipe arch on one of the integral pipelines-the line for hot superheated steam. In addition, in this paper are given the method methods that led to this methodology for testing and evaluation of the condition of the pipe arch material that had been in exploitation and the new pipe arch that will be embedded. Furthermore the approach, the technology of replacement, anchoring of the steam line, technology of welding etc., as well as the preparation of the final design of constructed condition are also covered in this paper.

  9. Determination of an Optimal Trunk Sewer-line Route for Kikuyu ...

    African Journals Online (AJOL)

    The best alternative is a sewerage system that uses sewer-lines to convey sewage into a treatment works. This project seeks to replace the traditional methods currently used in Kikuyu Town with a sewerage system. Geospatial technologies are used to site a treatment plant and the main trunk sewer-line route in Kikuyu ...

  10. Radiation quantities and units. ICRU report 33

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    This report supersedes ICRU Report 19. Since ICRU Report 19 was published, a number of discussions have taken place between members of the Report Committee on Fundamental Quantities and Units and other workers in the field. Some of these discussions have resulted in the acceptance of certain modifications in the material set out in Report 19 and these modifications are incorporated in the current report. In addition, there has been some expansion and rearrangement of the material in the earlier report. It is recommended that energy state be inserted into the definition of activity and that the word transformation be replaced by transition. These modifications have now been incorporated into the current definition. Helpful comments on the previous quantities and units report have resulted in clarification of several points in the present Report. In line with providing more didactic material and useful source material for other ICRU reports, the general considerations in subsection I.A of Report 19 have been expanded and placed in a separate subsection. The additional material includes discussions of four terms that are used in this document - quantity, unit, stochastic, and non-stochastic - along with a brief discussion of the mathematical formalism used in ICRU reports. 11 refs., 4 tabs

  11. Nursing procedures during continuous renal replacement therapies: a national survey.

    Science.gov (United States)

    Ricci, Zaccaria; Benelli, Sonia; Barbarigo, Fabio; Cocozza, Giulia; Pettinelli, Noemi; Di Luca, Emanuela; Mettifogo, Mariangela; Toniolo, Andrea; Ronco, Claudio

    2015-01-01

    The current role of nurses in the management of critically ill patients needing continuous renal replacement therapies is clearly fundamental. The care of these complex patients is typically shared by critical care and dialysis nurses: their precise duties may vary from country to country. To clarify this issue we conducted a national-level survey at a recent Italian course on nursing practices during continuous renal replacement therapies. A total of 119 questionnaires were analysed. The participants, who were equally divided between critical care and dialysis nurses, came from 44 different hospitals and 35 Italian cities. Overall, 23% of participants answered that "the dialysis staff" were responsible for continuous renal replacement therapies in the Intensive Care Unit, while 39% answered "the critical care nurse", and 38% "a shared organization". Interestingly, less than the half of participants claimed specific continuous renal replacement therapies training was provided to employees before handling an acute dialysis machine. Finally, about 60% of participants had experience of extra-corporeal membrane oxygenation machines used in conjunction with continuous renal replacement therapies. Workload coordination and management of critically ill patients undergoing continuous renal replacement therapies in Italy is not standardized. At present, the duties of critical care and dialysis nurses vary significantly across the country. They frequently overlap or leave gaps in the assistance received by patients. The role of nurses involved in the care of continuous renal replacement therapies patients in Italy currently requires better organization, possibly starting with intensive standardized training and educational programs.

  12. LS1 Report: The cryogenic line goes through the scanner

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    In spite of the complexity of LS1, with many different activities taking place in parallel and sometimes overlapping, the dashboard shows that work is progressing on schedule. This week, teams have started X-raying the cryogenic line to examine its condition in minute detail.   The LS1 schedule is pretty unfathomable for those who don't work in the tunnels or installations, but if you look down all the columns and stop at the line indicating today’s date, you can see that all of the priority and critical items are bang on time, like a Swiss watch. More specifically: the SMACC project in the LHC is on schedule, with a new testing phase for the interconnections which have already been consolidated; preparations are under way for the cable replacement campaign at Point 1 of the SPS (about 20% of the cables will not be replaced as they are completely unused); and the demineralised water distribution line is back in service, as are the electrical substations for the 400 and 66 kV line...

  13. A tewlve detector coincidence spectrometer for on-line and off-line measurements of nuclear g-factors

    International Nuclear Information System (INIS)

    Alfter, I.; Bodenstedt, E.; Hamer, B.; Hoff, J. van den; Knichel, W.; Muenning, H.; Piel, S.; Schueth, J.; Sajok, R.

    1992-01-01

    A twelve detector γ-γ directional correlation setup is described which has been designed and constructed for high precision on-line and off-line IPAC measurements. A ring of twelve BaF 2 detectors which may be replaced by Ge detectors is arranged around a superconducting magnet providing a maximum magnetic field of 4.5 T. In on-line experiments the magnetic field has the direction of the beam which passes through a central bore of the magnet. The data acquisition system stores directly the Esub(γ 1 )-Esub(γ 2 ) coincidence matrices for all 66 two-detector combinations in two 8 Mbyte RAMs, one for each of the two field directions. This allows a very fast data evaluation with a small on-line computer. The apparatus got into operation one-and-a-halve years ago and revealed excellent properties. (orig.)

  14. Sulforaphane Analogues with Heterocyclic Moieties: Syntheses and Inhibitory Activities against Cancer Cell Lines

    Directory of Open Access Journals (Sweden)

    Ye-Hui Shi

    2016-04-01

    Full Text Available Recent studies have shown that sulforaphane (SFN selectively inhibits the growth of ALDH+ breast cancer stem-like cells.Herein, a series of SFN analogues were synthesized and evaluated against breast cancer cell lines MCF-7 and SUM-159, and the leukemia stem cell-like cell line KG-1a. These SFN analogues were characterized by the replacement of the methyl group with heterocyclic moieties, and the replacement of the sulfoxide group with sulfide or sulfone. A growth inhibitory assay indicated that the tetrazole analogs 3d, 8d and 9d were significantly more potent than SFN against the three cancer cell lines. Compound 14c, the water soluble derivative of tetrazole sulfide 3d, demonstrated higher potency against KG-1a cell line than 3d. SFN, 3d and 14c significantly induced the activation of caspase-3, and reduced the ALDH+ subpopulation in the SUM159 cell line, while the marketed drug doxrubicin(DOX increased the ALDH+ subpopulation.

  15. Language Profile in Congenital Hypothyroid Children Receiving Replacement Therapy.

    Science.gov (United States)

    Soliman, Hend; Abdel Hady, Aisha Fawzy; Abdel Hamid, Asmaa; Mahmoud, Heba

    2016-01-01

    The aim of this work was to evaluate receptive and expressive language skills in children with congenital hypothyroidism receiving early hormonal replacement treatment before the age of 3 months and to identify any subtle areas of weaknesses in their language development to check the necessity for future language intervention. The study was conducted on 30 hypothyroid children receiving hormonal replacement. They were subdivided into group I (5-8 years 11 months; 12 cases) and group II (9-12 years 11 months; 18 cases). All patients were subjected to a protocol of assessment applied in the Diabetes, Endocrine and Metabolism Pediatric Unit (DEMPU) and evaluation of language skills by the REAL scale. The younger group reached average Arabic language scores, while the older group showed moderate language delay. Early replacement therapy supports language development in young children. However, longitudinal and follow-up studies are required to identify difficulties presenting at older ages that may affect children in the academic settings. © 2016 S. Karger AG, Basel.

  16. Ankle replacement

    Science.gov (United States)

    Ankle arthroplasty - total; Total ankle arthroplasty; Endoprosthetic ankle replacement; Ankle surgery ... Ankle replacement surgery is most often done while you are under general anesthesia. This means you will ...

  17. Cost Analysis Of Replacement And Bearing Trailer Maintenance In Sugar Group Companies

    OpenAIRE

    Mastur, Mastur; Masyhuri, Masyhuri; Waluyati, Lestari Rahayu

    2017-01-01

    The purpose of this study are to understand (i) the costs and periods optimal of grease used for the replacement and maintenance bearing trailer in Sugar Group Companies (SGC), and (ii) the effect of a period and frequency of grease, lifetime bearing, frequency of replacement bearing in a year, unit trailer, brand bearing, and location of plant. The basic method used is descriptive and analytical. The location determined were in Workshop Division PT. ILP, PT. SIL, and PT. GPM. The analytical ...

  18. Nicotine replacement therapy

    Science.gov (United States)

    Smoking cessation - nicotine replacement; Tobacco - nicotine replacement therapy ... Before you start using a nicotine replacement product, here are some things to know: The more cigarettes you smoke, the higher the dose you may need to ...

  19. Surry Power Station secondary water chemistry improvement since steam generator replacement and the unit two feedwater pipe rupture

    International Nuclear Information System (INIS)

    Swindell, E.T.

    1988-01-01

    Surry Power Station has two Westinghouse-designed three-loop PWRs of 811 MWe design rating. The start of commercial operation was in July, 1972 in No.1 plant, and May, 1973 in No.2 plant. Both plants began the operation using controlled phosphate chemistry for the steam generators. In 1975, both plants were converted to all volatile treatment on the secondary side due to the tube wall thinning corrosion in the steam generators, which was associated with the phosphate sludge that was building up on the tube sheets and created acidic condition. Thereafter, condenser and air leakage and steam generator denting occurred, and after the operation of 8 years 2 month of No.1 plant and 5 years 9 months of No.2 plant, the steam generators were replaced. A major plant improvement program was designed and implemented from 1979 to 1980. The improvement in new steam generators, the modification for preventing corrosion, the addition of a steam generator blowdown recovery system, the reconstruction of condensers, the installation of full flow, deep bed condensate polishers, the addition of Dionex 8,000 on-line ion chromatograph, a long term maintenance agreement with Westinghouse and so on are reported. (Kako, I.)

  20. Hip Replacement Surgery

    Science.gov (United States)

    ... Outreach Initiative Breadcrumb Home Health Topics English Español Hip Replacement Surgery Basics In-Depth Download Download EPUB ... PDF What is it? Points To Remember About Hip Replacement Surgery Hip replacement surgery removes damaged or ...

  1. Feasibility study of applying a multi-channel analysis model to on-line core monitoring system

    International Nuclear Information System (INIS)

    In, W. K.; Yoo, Y. J.; Hwang, D. H.; Jun, T. H.

    1998-01-01

    A feasibility study was performed to evaluate the effect of implementing a multi-channel analysis model in on-line core monitoring system. A simplified thermal-hydraulic model has been used in the on-line core monitoring system of digital PWR. The design procedure, core thermal margin and computation time were investigated in case of replacing the simplified model with the multi-channel analysis model. For the given ranges of limiting conditions for operation in Yonggwang Unit 3 Cycle 1, the minimum DNBR of the simplified thermal-hydraulic code CETOP-D was compared to that of the multi-channel analysis code MATRA. A CETOP-D tuning is additionally required to ensure the accurate and conservative DNBR calculation but the MATRA tuning is not necessary. MATRA appeared to increase the DNBR overpower margin from 2.5% to 6% over the CETOP-D margin. MATRA took approximately 1 second to compute DNBR on the HP9000 workstation system, which is longer than the DNBR computation time of CETOP-D. It is, however, fast enough to perform the on-line monitoring of DNBR. It can be therefore concluded that the application of the multi-channel analysis model MATRA in the on-line core monitoring system is feasible

  2. Total body irradiation with a reconditioned cobalt teletherapy unit.

    Science.gov (United States)

    Evans, Michael D C; Larouche, Renée-Xavière; Olivares, Marina; Léger, Pierre; Larkin, Joe; Freeman, Carolyn R; Podgorsak, Ervin B

    2006-01-01

    While the current trend in radiotherapy is to replace cobalt teletherapy units with more versatile and technologically advanced linear accelerators, there remain some useful applications for older cobalt units. The expansion of our radiotherapy department involved the decommissioning of an isocentric cobalt teletherapy unit and the replacement of a column-mounted 4-MV LINAC that has been used for total body irradiation (TBI). To continue offering TBI treatments, we converted the decommissioned cobalt unit into a dedicated fixed-field total body irradiator and installed it in an existing medium-energy LINAC bunker. This article describes the logistical and dosimetric aspects of bringing a reconditioned cobalt teletherapy unit into clinical service as a total body irradiator.

  3. Cell lines authentication and mycoplasma detection as minimun quality control of cell lines in biobanking.

    Science.gov (United States)

    Corral-Vázquez, C; Aguilar-Quesada, R; Catalina, P; Lucena-Aguilar, G; Ligero, G; Miranda, B; Carrillo-Ávila, J A

    2017-06-01

    Establishment of continuous cell lines from human normal and tumor tissues is an extended and useful methodology for molecular characterization of cancer pathophysiology and drug development in research laboratories. The exchange of these cell lines between different labs is a common practice that can compromise assays reliability due to contamination with microorganism such as mycoplasma or cells from different flasks that compromise experiment reproducibility and reliability. Great proportions of cell lines are contaminated with mycoplasma and/or are replaced by cells derived for a different origin during processing or distribution process. The scientific community has underestimated this problem and thousand of research experiment has been done with cell lines that are incorrectly identified and wrong scientific conclusions have been published. Regular contamination and authentication tests are necessary in order to avoid negative consequences of widespread misidentified and contaminated cell lines. Cell banks generate, store and distribute cell lines for research, being mandatory a consistent and continuous quality program. Methods implementation for guaranteeing both, the absence of mycoplasma and authentication in the supplied cell lines, has been performed in the Andalusian Health System Biobank. Specifically, precise results were obtained using real time PCR detection for mycoplasma and 10 STRs identification by capillary electrophoresis for cell line authentication. Advantages and disadvantages of these protocols are discussed.

  4. Spread-out Bragg peak and monitor units calculation with the Monte Carlo Code MCNPX

    International Nuclear Information System (INIS)

    Herault, J.; Iborra, N.; Serrano, B.; Chauvel, P.

    2007-01-01

    The aim of this work was to study the dosimetric potential of the Monte Carlo code MCNPX applied to the protontherapy field. For series of clinical configurations a comparison between simulated and experimental data was carried out, using the proton beam line of the MEDICYC isochronous cyclotron installed in the Centre Antoine Lacassagne in Nice. The dosimetric quantities tested were depth-dose distributions, output factors, and monitor units. For each parameter, the simulation reproduced accurately the experiment, which attests the quality of the choices made both in the geometrical description and in the physics parameters for beam definition. These encouraging results enable us today to consider a simplification of quality control measurements in the future. Monitor Units calculation is planned to be carried out with preestablished Monte Carlo simulation data. The measurement, which was until now our main patient dose calibration system, will be progressively replaced by computation based on the MCNPX code. This determination of Monitor Units will be controlled by an independent semi-empirical calculation

  5. 24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.

    Science.gov (United States)

    2010-04-01

    ... related to the conversion. (5) The units must be designed to remain lower-income dwelling units for at... result in the demolition of lower-income dwelling units or the conversion of lower-income dwelling units...-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary...

  6. CYP1A1 and CYP1A2 expression: Comparing 'humanized' mouse lines and wild-type mice; comparing human and mouse hepatoma-derived cell lines

    International Nuclear Information System (INIS)

    Uno, Shigeyuki; Endo, Kaori; Ishida, Yuji; Tateno, Chise; Makishima, Makoto; Yoshizato, Katsutoshi; Nebert, Daniel W.

    2009-01-01

    Human and rodent cytochrome P450 (CYP) enzymes sometimes exhibit striking species-specific differences in substrate preference and rate of metabolism. Human risk assessment of CYP substrates might therefore best be evaluated in the intact mouse by replacing mouse Cyp genes with human CYP orthologs; however, how 'human-like' can human gene expression be expected in mouse tissues? Previously a bacterial-artificial-chromosome-transgenic mouse, carrying the human CYP1A1 C YP1A2 locus and lacking the mouse Cyp1a1 and Cyp1a2 orthologs, was shown to express robustly human dioxin-inducible CYP1A1 and basal versus inducible CYP1A2 (mRNAs, proteins, enzyme activities) in each of nine mouse tissues examined. Chimeric mice carrying humanized liver have also been generated, by transplanting human hepatocytes into a urokinase-type plasminogen activator(+/+) s evere-combined-immunodeficiency (uPA/SCID) line with most of its mouse hepatocytes ablated. Herein we compare basal and dioxin-induced CYP1A mRNA copy numbers, protein levels, and four enzymes (benzo[a]pyrene hydroxylase, ethoxyresorufin O-deethylase, acetanilide 4-hydroxylase, methoxyresorufin O-demethylase) in liver of these two humanized mouse lines versus wild-type mice; we also compare these same parameters in mouse Hepa-1c1c7 and human HepG2 hepatoma-derived established cell lines. Most strikingly, mouse liver CYP1A1-specific enzyme activities are between 38- and 170-fold higher than human CYP1A1-specific enzyme activities (per unit of mRNA), whereas mouse versus human CYP1A2 enzyme activities (per unit of mRNA) are within 2.5-fold of one another. Moreover, both the mouse and human hepatoma cell lines exhibit striking differences in CYP1A mRNA levels and enzyme activities. These findings are relevant to risk assessment involving human CYP1A1 and CYP1A2 substrates, when administered to mice as environmental toxicants or drugs.

  7. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  8. Should a coal-fired power plant be replaced or retrofitted?

    Energy Technology Data Exchange (ETDEWEB)

    Dalia Patino-Echeverri; Benoit Morel; Jay Apt; Chao Chen [Carnegie Mellon University, Pittsburgh, PA (USA)

    2007-12-15

    In a cap-and-trade system, a power plant operator can choose to operate while paying for the necessary emissions allowances, retrofit emissions controls to the plant, or replace the unit with a new plant. Allowance prices are uncertain, as are the timing and stringency of requirements for control of mercury and carbon emissions. We model the evolution of allowance prices for SO{sub 2}, NOx, Hg, and CO{sub 2} using geometric Brownian motion with drift, volatility, and jumps, and use an options-based analysis to find the value of the alternatives. In the absence of a carbon price, only if the owners have a planning horizon longer than 30 years would they replace a conventional coal-fired plant with a high-performance unit such as a supercritical plant; otherwise, they would install SO{sub 2} and NOx controls on the existing unit. An expectation that the CO{sub 2} price will reach $50/t in 2020 makes the installation of an IGCC with carbon capture and sequestration attractive today, even for planning horizons as short as 20 years. A carbon price below $40/t is unlikely to produce investments in carbon capture for electric power. 1 ref., 5 figs., 2 tabs.

  9. Decision unit program

    International Nuclear Information System (INIS)

    Madjar, N.; Pastor, C.; Chambon, B.; Drain, D.; Giorni, A.; Dauchy, A.

    1981-01-01

    A decision unit has been built to simplify the electronic logic set-up in multi-detectors experiments. This unit, designed with fast memories used as decision making tables, replaces conventional logic modules. Nine inputs are provided for receiving the fast detector signals (charged particles, gammas, neutrons, ...). Fifteen independent outputs allow the identification of the choosen events among the 2 9 possible events. A CAMAC interface between the unit and the computer, or a manual control auxiliary module, is used to load, in the memory, the pattern of the choosen events [fr

  10. Replacement of a vessel head, an operation which today gets easily into its stride

    International Nuclear Information System (INIS)

    Mardon, P.; Chaumont, J.C.; Lambiotte, P.

    1995-01-01

    In 1992, one year after the detection of a leak in a vessel head of the Electricite de France (EDF) Bugey 4 reactor, the head was replaced by the Framatome-Jeumont Industrie Group. Today, this group, which has developed new methods and new tools to optimize the cost, the time-delay and the dosimetry of this kind of intervention, has performed 11 additional replacements, two of which on 1300 MWe power units. This paper describes step by step the successive operations required for a complete vessel head replacement, including the testing of safety systems before starting up the reactor. (J.S.). 7 photos

  11. Learner-Centered Instruction (LCI): Volume IV, The Simulated Maintenance Task Environment (SMTE): A Job Specific Simulator.

    Science.gov (United States)

    Rifkin, Kenneth I.; And Others

    The purpose of the simulated maintenance task environment is to provide a means for training and job performance testing of the flight line weapon control systems mechanic/technician for the F-111A aircraft. It provides practice in flight line equipment checkout, troubleshooting, and removal and replacement of line replaceable units in the…

  12. Vehicle with inclinable caterpillar propulsion units

    International Nuclear Information System (INIS)

    Clar, G.

    1991-01-01

    This vehicle usable in hostile environment such nuclear industry has four propulsion units with a caterpillar track and two integrated motors: one for advancing the caterpillar track and the other for inclining the propulsion unit when overcoming obstacles. Each propulsion unit is easily replaceable because there are no mechanical parts in the body of the vehicle [fr

  13. Knee Replacement

    Science.gov (United States)

    Knee replacement is surgery for people with severe knee damage. Knee replacement can relieve pain and allow you to ... Your doctor may recommend it if you have knee pain and medicine and other treatments are not ...

  14. Maintenance and repair tools of the 900 MW PWR units in France

    International Nuclear Information System (INIS)

    Blary, F.; Castaing, C.; Hassig, J.

    1985-01-01

    EDF and FRAMATOME have developed special tools and, repair and maintenance procedures to decrease the unavailability of the PWR units and the dosimetry of the personnel of maintenance. This report presents the solution adopted to face the problem of replacement of the internal upper structure pins of 21 units: 1) study and realisation of important industrial means; 2) development of a strategy: the pin replacement is separated from the guide tube replacement by the creation of a pin replacement shop, and, as often as it is possible, the ''AQUARIUM'' method allows to replace the guide-tubes with the aid of a mobile pool called AQUARIUM outside the critical way of shutdown [fr

  15. Telemedicine Can Replace the Neurologist on a Mobile Stroke Unit.

    Science.gov (United States)

    Wu, Tzu-Ching; Parker, Stephanie A; Jagolino, Amanda; Yamal, Jose-Miguel; Bowry, Ritvij; Thomas, Abraham; Yu, Amy; Grotta, James C

    2017-02-01

    The BEST-MSU study (Benefits of Stroke Treatment Delivered Using a Mobile Stroke Unit) is a comparative effectiveness trial in patients randomized to mobile stroke unit or standard management. A substudy tested interrater agreement for tissue-type plasminogen activator eligibility between a telemedicine vascular neurologist and onboard vascular neurologist. On scene, both the telemedicine vascular neurologist and onboard vascular neurologist independently evaluated the patient, documenting their tissue-type plasminogen activator treatment decision, National Institutes of Health Stroke Scale score, and computed tomographic interpretation. Agreement was determined using Cohen κ statistic. Telemedicine-related technical failures that impeded remote assessment were recorded. Simultaneous and independent telemedicine vascular neurologist and onboard vascular neurologist assessment was attempted in 174 patients. In 4 patients (2%), the telemedicine vascular neurologist could not make a decision because of technical problems. The telemedicine vascular neurologist agreed with the onboard vascular neurologist on 88% of evaluations (κ=0.73). Remote telemedicine vascular neurologist assessment is reliable and accurate, supporting either telemedicine vascular neurologist or onboard vascular neurologist assessment on our mobile stroke unit. URL: http://www.clinicaltrials.gov. Unique identifier: NCT02190500. © 2017 American Heart Association, Inc.

  16. Contribution to optimization of preventive replacement

    International Nuclear Information System (INIS)

    Legat, V.; Zaludova, A.H.; Cervenka, V.; Jurca, V.

    1996-01-01

    The paper presents a method for determining the optimal interval for preventive maintenance/replacement using either an age-based or diagnostic-based renewal strategy. For the case of a finite-time horizon, for which the computations are complicated, a simple formula is proposed for modifying the commonly used inifinite-time solution so that it gives a good approximation to the exact finite-time solution. Examples demonstrate that the method is sufficiently accurate and simple in practice for typical engineering components with Weibull life distributions and for a reasonable range of the cost factor (ratio of unit corrective to unit preventive maintenance costs). This paper investigates the problem of the accuracy of the results compared to the exact, finite-time solution for a selected matrix of time-to failure Weibull shape parameters and cost factors commonly occurring in technical practice. Applications offer substantial benefits to both manufacturer and user of technical equipment

  17. Replacement of fishmeal for soy protein concentrate in diets for juvenile Litopenaeus vannamei in biofloc-based rearing system

    Directory of Open Access Journals (Sweden)

    Adolfo Jatobá

    Full Text Available ABSTRACT This study aimed to assess the final body weight, weekly weight gain, yield, apparent feed efficiency, protein efficiency ratio, and feed intake of the Pacific white shrimp (Litopenaeus vannamei fed four diets containing different levels of soy protein concentrate (SPC as a replacement for fishmeal, reared in a super-intensive biofloc system. Diets consisted of replacing 209 g kg-1 fishmeal at 0, 33, 66, and 100% SPC. Shrimp were raised in a biofloc system using twelve experimental units stocked with 250 shrimp m-3 under constant aeration (O2>5mg L-1 and temperature (29±0.5 °C. No significant differences among treatments were observed based on water quality parameters. Shrimp fed diets with 0 and 33% substitution exhibited the highest weekly growth (1.88 and 1.79 g per week and final weights (15.2 and 14.7 g compared with shrimp fed the 66 and 100% replacement. A lower feed intake was observed for shrimp fed the 33% SPC diet (3.18 kg per experimental unit compared with 0% replacement (3.62 kg. Shrimp fed the 33% replacement achieved a similar performance and lower feed intake than animals fed diet without replacement.

  18. Redesign of emergency water supply system by-pass line from Cernavoda NPP Unit 1 and 2 using self regulating valves

    International Nuclear Information System (INIS)

    Tenescu, Mircea; Bigu, Melania; Nita, Iulian Pavel

    2010-01-01

    In this paper one considered improving the EWS (emergency water supply system) by-pass line in order to replace current manual operated valve with an self operated valve. This change is necessary in order to reduce the human error events in operation of the system in case of a DBE (design basis earthquake). The paper describes a theoretical and practical operation of a system using self regulating flow rate valves. Basically, the elimination of a possible human error in operating a system is important for nuclear safety in case of a DBE because it makes it avoidable in normal reactor cooling systems. The paper describes checking of the functioning of this equipment in operating conditions, investigating how it responds to various operating regimes. (authors)

  19. Inherent Immunogenicity or Lack Thereof of Pluripotent Stem Cells: Implications for Cell Replacement Therapy

    Directory of Open Access Journals (Sweden)

    Arvind Chhabra

    2017-08-01

    Full Text Available Donor-specific induced pluripotent stem cells (iPSCs offer opportunities for personalized cell replacement therapeutic approaches due to their unlimited self-renewal potential and ability to differentiate into different somatic cells. A significant progress has been made toward generating iPSC lines that are free of integrating viral vectors, development of xeno-free culture conditions, and differentiation of pluripotent stem cells (PSCs into functional somatic cell lineages. Since donor-specific iPSC lines are genetically identical to the individual, they are expected to be immunologically matched and these iPSC lines and their cellular derivatives are not expected to be immunologically rejected. However, studies in mouse models, utilizing rejection of teratomas as a model, have claimed that syngenic iPSC lines, especially the iPSC lines derived with integrating viral vectors, could be inherently immunogenic. This manuscript reviews current understanding of inherent immunogenicity of PSC lines, especially that of the human iPSC lines and their cellular derivatives, and strategies to overcome it.

  20. Reactor vessel closure head replacements in 1997

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Framatome-Jeumont Industrie consortium have completed in 1997 28 reactor vessel (RV) closure head replacements, including five on 1300 MWe class PWR units. Framatome manages the operations and handles removal and reinstallation of equipment (not including the control rod drive mechanisms (CRDM)) and the requalification tests, while JI, which manufactures the CRDMs, is involved in the CRDM cutting, re-machining and welding operations, using tools of original design, in order to optimize the RV closure head operation in terms of costs, schedule and dosage

  1. On-line structural damage localization and quantification using wireless sensors

    International Nuclear Information System (INIS)

    Hsu, Ting-Yu; Huang, Shieh-Kung; Lu, Kung-Chung; Loh, Chin-Hsiung; Wang, Yang; Lynch, Jerome Peter

    2011-01-01

    In this paper, a wireless sensing system is designed to realize on-line damage localization and quantification of a structure using a frequency response function change method (FRFCM). Data interrogation algorithms are embedded in the computational core of the wireless sensing units to extract the necessary structural features, i.e. the frequency spectrum segments around eigenfrequencies, automatically from measured structural response for the FRFCM. Instead of the raw time history of the structural response, the extracted compact structural features are transmitted to the host computer. As a result, with less data transmitted from the wireless sensors, the energy consumed by the wireless transmission is reduced. To validate the performance of the proposed wireless sensing system, a six-story steel building with replaceable bracings in each story is instrumented with the wireless sensors for on-line damage detection during shaking table tests. The accuracy of the damage detection results using the wireless sensing system is verified through comparison with the results calculated from data recorded of a traditional wired monitoring system. The results demonstrate that, by taking advantage of collocated computing resources in wireless sensors, the proposed wireless sensing system can locate and quantify damage with acceptable accuracy and moderate energy efficiency

  2. Nuclear power - replacement of pressure tubes in CANDU reactors

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The CANDU pressure tube reactor is an effective electricity generator. While most units have been built in Canada, units are successfully operated in Argentina and Korea as well as India and Pakistan, which have early versions of the same concept. Units are also under construction in Korea and Romania. The main constructional components of a CANDU core are the calandria vessel, the fuel channels and the reactivity control mechanisms. The fuel channel, in particular the pressure tubes, see an environment comprising high flux, high temperature water at high pressures, which induces changes in the properties and dimensions of the channel components. From the first, fuel channels were designed to be replaced because of the difficulty in predicting the behaviour of zirconium alloys in such service over a long period of time. In fact some phenomena, that were not known at the time of the earliest designs, have led to unacceptable changes in the properties of the channels and these early reactors have had to be retubed at half their intended life. These deficiencies have been corrected in the latest designs and fuel channels in reactors that have commenced operation over the last 10 years, are predicted to reach the intended 30 years life before replacement is necessary. The changing of fuel channels, the details and experience of which are explained, has been shown to be an effective way of refurbishing the CANDU reactor, extending its lifetime a further 25-30 years. (author)

  3. Energy efficiency effect on the public street lighting by using LED light replacement and kwh-meter installation at DKI Jakarta Province, Indonesia

    Science.gov (United States)

    Sudarmono, Panggih; Deendarlianto; Widyaparaga, Adhika

    2018-05-01

    Public street lighting consumes large energy for the public interest, but many street lights still do not use energy-saving technologies. In 2014, Provincial Government of DKI Jakarta operated 179,305 units of street lights. Of the number of installed armature, 92 % of them or 166,441 units are HPS (High-Pressure Sodium) armatures which are inefficient. In 2016, the Provincial Government of DKI Jakarta cut down the energy used for street lighting, by implementing the programs of kWh-meter installation in every street lighting panel and use energy-saving lamps equipped with the smart system. The Provincial Government of DKI Jakarta is registered with 6,399 customer IDs in PLN (State Owned Electric Company), and gradually carried out the kWh Meter installation and changes to the contract. The program to use energy-saving lights done by replacing the HPS armature that is not energy efficient to LED armature which is known to be energy efficient. Until the end of 2016, the number of armatures that has been replaced was 89,417 units. The research results on 25 samples of PLN customer IDs and the replacement of 2,162 units armature, showed that the energy efficiency through kWh meter installation and armature replacement reduce the power consumption from 330,414 kWh to 71,278 kWh or by 78.43%. Generally, there was a decrease in the value of electricity bill compared to the before the replacement. The program of kWh-meter installations and replacement of the armature has a payback period of 2.66 years.

  4. LINE FUSION GENES: a database of LINE expression in human genes

    Directory of Open Access Journals (Sweden)

    Park Hong-Seog

    2006-06-01

    Full Text Available Abstract Background Long Interspersed Nuclear Elements (LINEs are the most abundant retrotransposons in humans. About 79% of human genes are estimated to contain at least one segment of LINE per transcription unit. Recent studies have shown that LINE elements can affect protein sequences, splicing patterns and expression of human genes. Description We have developed a database, LINE FUSION GENES, for elucidating LINE expression throughout the human gene database. We searched the 28,171 genes listed in the NCBI database for LINE elements and analyzed their structures and expression patterns. The results show that the mRNA sequences of 1,329 genes were affected by LINE expression. The LINE expression types were classified on the basis of LINEs in the 5' UTR, exon or 3' UTR sequences of the mRNAs. Our database provides further information, such as the tissue distribution and chromosomal location of the genes, and the domain structure that is changed by LINE integration. We have linked all the accession numbers to the NCBI data bank to provide mRNA sequences for subsequent users. Conclusion We believe that our work will interest genome scientists and might help them to gain insight into the implications of LINE expression for human evolution and disease. Availability http://www.primate.or.kr/line

  5. Gentilly 2 divider plate replacement

    International Nuclear Information System (INIS)

    Forest, J.; Klisel, E.; McClellan, G.; Schnelder, W.

    1995-01-01

    The steam generators at the Gentilly 2 Nuclear Plant in operation since 1983 were built with primary divider plates of a bolted panel configuration. During a routine outage inspection, it was noted that two bolts had dislodged from the divider and were located lying in the primary head. Subsequent inspections revealed erosion damage to a substantial number of divider plate bolts and to a lesser extent, to the divider plate itself. After further inspection and repair the units were returned to operation, however, it was determined that a permanent replacement of the primary divider plates was going to be necessary. After evaluation of various options, it was decided that the panel type dividers would be replaced with a single piece floating design. The divider itself was to be of a one piece all-welded arrangement to be constructed from individual panels to be brought in through the manways. In view of the strength limitations of the bolted attachment of the upper seat bar to the tubesheet, a new welded seat bar was provided. To counteract erosion concerns, the new divider is fitted with erosion resistant inserts or weld buildup and with improved sealing features in order to minimize leakage and erosion. At an advanced stage in the design and manufacture of the components, the issue of divider strength during LOCA conditions came into focus. Analysis was performed to determine the strength and/or failure characteristics of the divider to a variety of small and large LOCA conditions. The paper describes the diagnosis of the original divider plates and the design, manufacture, field mobilization, installation and subsequent operation of the replacement divider plates. (author)

  6. Environmentally Friendly Replacement of Mature 200 MW Coal-Fired Power Blocks with 2 Boilers Working on One 500 MW Class Steam Turbine Generator (2on1 Unit Concept)

    Science.gov (United States)

    Grzeszczak, Jan; Grela, Łukasz; Achter, Thomas

    2017-12-01

    The paper covers problems of the owners of a fleet of long-operated conventional power plants that are going to be decommissioned soon in result of failing to achieve new admissible emissions levels or exceeding pressure elements design lifetime. Energoprojekt-Katowice SA, Siemens AG and Rafako SA presents their joint concept of the solution which is a 2on1 concept - replacing two unit by two ultra-supercritical boilers feeding one turbine. Polish market has been taken as an example.

  7. Refrigerator retirement and replacement programs : lessons learned and application to an Ontario wide program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-05-15

    The best practices in refrigerator retirement programs in North America were identified in an effort to develop a concept for an Ontario-wide provincial refrigerator retirement program. The report focused on describing refrigerator retirement programs, namely those programs that focused on getting rid of old secondary refrigerators. The report excluded refrigerator replacement programs, which encourage householders to retire their refrigerators early and replace them with an energy star refrigerator. However, it was noted that in several regions, both replacement and retirement programs are offered at the same time. The report provided background information on energy use by refrigerators as well as refrigerator retirement and replacement programs. Types of refrigerator retirement and replacement programs and the environmental benefits of these programs were also described. The report also addressed the potential energy impact of an Ontario-wide refrigerator retirement program as well as consumer incentive and bounties initiatives to encourage households to retire units. Other topics covered in the report included the design of typical refrigerator retirement and replacement programs; collection and recycling of retired refrigerators; reported costs of refrigerator retirement and replacement programs; as well as marketing and advertising. The role of retailers and manufacturers and reported lessons learned from refrigerator retirement and replacement were also presented. 14 refs., 6 tabs., 6 appendices.

  8. Technical and economic feasibility for the application of micronized coal as a replacement for No. 2 oil for start-up and low-load operation at Illinois Power Havana No. 6 Cycling Unit

    International Nuclear Information System (INIS)

    Rosenberger, F.; Guilfoyle, C.J.; Parker, W.O. Jr.

    1991-01-01

    Uncertainty regarding oil availability and long-term price stability make it difficult for a utility to predict annual ignition costs for a cycling unit. Illinois Power Company, Sargent and Lundy Engineering and Micro-fuel Corporation have produced a detailed feasibility study on the application of micronized coal as a replacement fuel for start-up and low-load operation for Havana No. 6. This unit is a B and W opposed-fired boiler which is rated at 410 MWe (summer net). This paper presents technical and economic analysis, including the uncertainties of the application of this technology

  9. Tibialis Anterior Tendon: A Reliable Anatomical Landmark Indicating the Ankle Centre. Potential Utility in Extra-Medullary Alignment During Total Knee Replacement

    Directory of Open Access Journals (Sweden)

    Avadhoot P. Kantak

    2017-07-01

    Full Text Available Background Extramedullary alignment is a well established surgical technique during total knee replacement. There are different methods to achieve accuracy but variability is quite extensive. To attain uniformity in the surgical technique we have been using the tibialis tendon to align our resection guide. This may prove to be a useful aid for surgeons during knee replacement surgery. Objectives The purpose of our study was to establish if tibialis anterior tendon represents the centre of ankle joint and if it could be used as an anatomical reference for alignment during knee replacement. Methods We designed a retrospective radiological cohort study. We studied sixty MRI scans of normal ankles. The centre of ankle joint was marked as a bisection point of the intermalleolar line at the level of superior surface of the talus. A line was drawn connecting the centre of Achilles tendon to the ankle centre and this was extended anteriorly. This line was found to have a constant relation to the ankle centre and it would simulate the positioning of the standard alignment device used. Results The tibialis anterior tendon lies less than 3mm medial to the ankle centre in the frontal plane. Conclusions We conclude that the tibialis anterior tendon can be used during knee replacement surgery as an accurate alignment guide.

  10. Optimal replacement policy for safety-related multi-component multi-state systems

    International Nuclear Information System (INIS)

    Xu Ming; Chen Tao; Yang Xianhui

    2012-01-01

    This paper investigates replacement scheduling for non-repairable safety-related systems (SRS) with multiple components and states. The aim is to determine the cost-minimizing time for replacing SRS while meeting the required safety. Traditionally, such scheduling decisions are made without considering the interaction between the SRS and the production system under protection, the interaction being essential to formulate the expected cost to be minimized. In this paper, the SRS is represented by a non-homogeneous continuous time Markov model, and its state distribution is evaluated with the aid of the universal generating function. Moreover, a structure function of SRS with recursive property is developed to evaluate the state distribution efficiently. These methods form the basis to derive an explicit expression of the expected system cost per unit time, and to determine the optimal time to replace the SRS. The proposed methodology is demonstrated through an illustrative example.

  11. A tangent subsolar merging line

    International Nuclear Information System (INIS)

    Crooker, N.U.; Siscoe, G.L.; Toffoletto, F.R.

    1990-01-01

    The authors describe a global magnetospheric model with a single subsolar merging line whose position is determined neither locally by the relative orientations and strengths of the merging fields nor globally by the orientation of a separator line--the governing parameters of most previous models--but by the condition of tangential contact between the external field and the magnetopause. As in previous models, the tilt of the merging line varies with IMF orientation, but here it also depends upon the ratio of Earth's magnetic flux that leaks out of the magnetopause to IMF flux that penetrates in. In the limiting case treated by Alekseyev and Belen'kaya, with no leakage of Earth's field and total IMF penetration, the merging line forms a great circle around a spherical magnetosphere where undeviated IMF lines lie tangent to its surface. This tangent merging line lies perpendicular to the IMF. They extend their work to the case of finite leakage and partial penetration, which distort the IMF into a draped pattern, thus changing the locus of tangency to the sphere. In the special case where the penetrating IMF flux is balanced by an equal amount of Earth flux leakage, the tangent merging line bisects the angle between the IMF and Earth's northward subsolar field. This result is identical to the local merging line model result for merging fields with equal magnitude. Here a global flux balance condition replaces the local equal magnitude condition

  12. Nuclear facilities: repair and replacement technologies; Installations nucleaires: technologies de reparation et de remplacement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The oldest operating reactors are more than 35 years old and are now facing major maintenance operations. The first replacement of a pressurizer took place in autumn 2005 at the St-Lucie plant (Usa) while steam generators have been currently replaced since 1983. Nuclear industry has to adapt to this new market by proposing innovative technological solutions in the reactor maintenance field. This document gathers the 9 papers presented at the conference. The main improvements concern repair works on internal components of PWR-type reactors, the replacement of major components of the primary coolant circuit and surface treatments to limit the propagation of damages. The first paper shows that adequate design and feedback experience are good assets to manage the ageing of a nuclear unit. Another paper shows that a new repair method of a relief valve can avoid its replacement. (A.C.)

  13. Outcomes in nonagenarians after heart valve replacement operation.

    Science.gov (United States)

    Edwards, Maria-Benedicta; Taylor, Kenneth M

    2003-03-01

    Changes in the age profile of the United Kingdom population and improvements in preoperative and postoperative care have resulted in increasing numbers of very elderly patients undergoing heart valve replacement (HVR) operations. Although HVR operations in nonagenarians are relatively uncommon, the demand for cardiac operations in this age group may increase over time. Outcomes after HVR operations in nonagenarians have not been well described yet. Therefore, the aim of this study was to determine outcomes in terms of early mortality and long-term survival in 35 nonagenarians after HVR operation. Data from the United Kingdom Heart Valve Registry were analyzed and nonagenarian patients were identified. Additional analyzed data include gender, valve position, valve type, valve size, operative priority, follow-up time, and date and cause of death. Kaplan-Meier actuarial curves were calculated to determine accurate 30-day mortality and long-term survival. On average five HVR operations are performed annually in the United Kingdom in nonagenarians with equal numbers of males and females. Aortic valve replacement with a bioprosthetic valve was the most common operation and 86% were elective admissions. Fourteen patients died within the review period; mean time to death was 402 days. Overall 30-day mortality was 17%, which was higher for males compared with females; females also displayed better long-term survival. HVR operations in nonagenarians carry a significantly higher risk of early mortality and reduced long-term survival. Despite increases in the age profile of the population, elective HVR operation with patients aged 90 years or older is likely to remain an infrequent surgical procedure reserved for very carefully selected patients.

  14. Transcatheter aortic valve replacement

    Science.gov (United States)

    ... gov/ency/article/007684.htm Transcatheter aortic valve replacement To use the sharing features on this page, please enable JavaScript. Transcatheter aortic valve replacement (TAVR) is surgery to replace the aortic valve. ...

  15. On-line valve monitoring at the Ormen Lange gas plant

    Energy Technology Data Exchange (ETDEWEB)

    Greenlees, R.; Hale, S. [Score Atlanta Inc., Kennesaw, Georgia (United States)

    2011-07-01

    The purpose of this presentation is to discuss replacing time and labor intensive nuclear outage activities with on line condition monitoring solutions, primarily the periodic verification of MOV functionality discussed in USNRC Generic Letter 96.05. This regulation requires that MOV age related performance degradations are properly identified and accounted for, causing utilities to have to retest valves periodically for the duration of the plants operating license. AECL designed CANDU reactors have a world class performance and safety record, with typical average annual capacity factors of 90%. The CANDU reactor design has the ability to refuel on line, as a result (a) it can be a challenge scheduling all required valve testing into limited duration outage work windows, (b) at multi unit sites, Unit 0 valves can be difficult to test because they are rarely ever out of service, (c) deuterium-oxide (heavy water) moderator is expensive to manufacture, as a result, effective through valve leakage monitoring is essential. These three factors alone make CANDU sites the most suitable candidates for on line valve monitoring systems. Nuclear industry regulations have been instrumental in the development of 'at the valve' diagnostic systems, but diagnostic testing has not typically been utilized to the same degree in other less regulated industries. However, that trend is changing, and the move toward valve diagnostics and condition monitoring has moved fastest in the offshore oil and gas industry on the Norwegian side of the North Sea. The Ormen Lange plant, located on Nyhamna Island on the west coast of Norway, operated by Shell, is one of the worlds most advanced gas processing plants. A stated maintenance goal for the plant is that 70% of the maintenance budget and spend should be based on the results of on line condition monitoring, utilizing monitoring systems equipped with switch sensing, strain gages, hydraulic and pneumatic pressure transducers and

  16. On-line valve monitoring at the Ormen Lange gas plant

    International Nuclear Information System (INIS)

    Greenlees, R.; Hale, S.

    2011-01-01

    The purpose of this presentation is to discuss replacing time and labor intensive nuclear outage activities with on line condition monitoring solutions, primarily the periodic verification of MOV functionality discussed in USNRC Generic Letter 96.05. This regulation requires that MOV age related performance degradations are properly identified and accounted for, causing utilities to have to retest valves periodically for the duration of the plants operating license. AECL designed CANDU reactors have a world class performance and safety record, with typical average annual capacity factors of 90%. The CANDU reactor design has the ability to refuel on line, as a result (a) it can be a challenge scheduling all required valve testing into limited duration outage work windows, (b) at multi unit sites, Unit 0 valves can be difficult to test because they are rarely ever out of service, (c) deuterium-oxide (heavy water) moderator is expensive to manufacture, as a result, effective through valve leakage monitoring is essential. These three factors alone make CANDU sites the most suitable candidates for on line valve monitoring systems. Nuclear industry regulations have been instrumental in the development of 'at the valve' diagnostic systems, but diagnostic testing has not typically been utilized to the same degree in other less regulated industries. However, that trend is changing, and the move toward valve diagnostics and condition monitoring has moved fastest in the offshore oil and gas industry on the Norwegian side of the North Sea. The Ormen Lange plant, located on Nyhamna Island on the west coast of Norway, operated by Shell, is one of the worlds most advanced gas processing plants. A stated maintenance goal for the plant is that 70% of the maintenance budget and spend should be based on the results of on line condition monitoring, utilizing monitoring systems equipped with switch sensing, strain gages, hydraulic and pneumatic pressure transducers and acoustic leakage

  17. Comparison of corrosion scales in full and partially replaced lead service lines after changes in water quality

    Science.gov (United States)

    Preliminary results from scales formed 38 weeks following the LSL replacement simulations revealed differences in scale formations amongst varying water qualities and pipe sequence. Rigs fed with dechlorinated tap water show distinct pH gradients between the galvanic and the back...

  18. Lining seam elimination algorithm and surface crack detection in concrete tunnel lining

    Science.gov (United States)

    Qu, Zhong; Bai, Ling; An, Shi-Quan; Ju, Fang-Rong; Liu, Ling

    2016-11-01

    Due to the particularity of the surface of concrete tunnel lining and the diversity of detection environments such as uneven illumination, smudges, localized rock falls, water leakage, and the inherent seams of the lining structure, existing crack detection algorithms cannot detect real cracks accurately. This paper proposed an algorithm that combines lining seam elimination with the improved percolation detection algorithm based on grid cell analysis for surface crack detection in concrete tunnel lining. First, check the characteristics of pixels within the overlapping grid to remove the background noise and generate the percolation seed map (PSM). Second, cracks are detected based on the PSM by the accelerated percolation algorithm so that the fracture unit areas can be scanned and connected. Finally, the real surface cracks in concrete tunnel lining can be obtained by removing the lining seam and performing percolation denoising. Experimental results show that the proposed algorithm can accurately, quickly, and effectively detect the real surface cracks. Furthermore, it can fill the gap in the existing concrete tunnel lining surface crack detection by removing the lining seam.

  19. A model for calculating the optimal replacement interval of computer systems

    International Nuclear Information System (INIS)

    Fujii, Minoru; Asai, Kiyoshi

    1981-08-01

    A mathematical model for calculating the optimal replacement interval of computer systems is described. This model is made to estimate the best economical interval of computer replacement when computing demand, cost and performance of computer, etc. are known. The computing demand is assumed to monotonously increase every year. Four kinds of models are described. In the model 1, a computer system is represented by only a central processing unit (CPU) and all the computing demand is to be processed on the present computer until the next replacement. On the other hand in the model 2, the excessive demand is admitted and may be transferred to other computing center and processed costly there. In the model 3, the computer system is represented by a CPU, memories (MEM) and input/output devices (I/O) and it must process all the demand. Model 4 is same as model 3, but the excessive demand is admitted to be processed in other center. (1) Computing demand at the JAERI, (2) conformity of Grosch's law for the recent computers, (3) replacement cost of computer systems, etc. are also described. (author)

  20. A method of meta-mechanism combination and replacement based on motion study

    Directory of Open Access Journals (Sweden)

    Yadong Fang

    2015-01-01

    Full Text Available Lacking the effective methods to reduce labor and cost, many small- and medium-sized assembly companies are facing with the problem of high cost for a long time. In order to reduce costs of manual operations, the method of meta-mechanism combination and replacement is studied. In this paper, we mainly discuss assembling motion analysis, workpieces position information acquisition, motion library construction, assembling motion analysis by Maynard’s operation sequence technique, meta-mechanism database establishment, and match of motion and mechanism. At the same time, the principle, process, and system realization framework of mechanism replacement are introduced. Lastly, problems for low-cost automation of the production line are basically resolved by operator motion analysis and meta-mechanism combination and match.

  1. Overhead distribution line models for harmonics studies

    Energy Technology Data Exchange (ETDEWEB)

    Nagpal, M.; Xu, W.; Dommel, H.W.

    1994-01-01

    Carson's formulae and Maxwell's potential coefficients are used for calculating the per unit length series impedances and shunt capacitances of the overhead lines. The per unit length values are then used for building the models, nominal pi-circuit, and equivalent pi-circuit at the harmonic frequencies. This paper studies the accuracy of these models for presenting the overhead distribution lines in steady-state harmonic solutions at frequencies up to 5 kHz. The models are verified with a field test on a 25 kV distribution line and the sensitivity of the models to ground resistivity, skin effect, and multiple grounding is reported.

  2. 48 CFR 1845.7101-3 - Unit acquisition cost.

    Science.gov (United States)

    2010-10-01

    ... production inventory and include programmed extra units to cover replacement during the fabrication process... ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Forms Preparation 1845.7101-3 Unit acquisition cost. (a... production costs (for assets produced or constructed). (5) Engineering, architectural, and other outside...

  3. Ankle replacement - discharge

    Science.gov (United States)

    ... total - discharge; Total ankle arthroplasty - discharge; Endoprosthetic ankle replacement - discharge; Osteoarthritis - ankle ... You had an ankle replacement. Your surgeon removed and reshaped ... an artificial ankle joint. You received pain medicine and were ...

  4. Hardware Implementation Of Line Clipping A lgorithm By Using FPGA

    Directory of Open Access Journals (Sweden)

    Amar Dawod

    2013-04-01

    Full Text Available The computer graphics system performance is increasing faster than any other computing application. Algorithms for line clipping against convex polygons and lines have been studied for a long time and many research papers have been published so far. In spite of the latest graphical hardware development and significant increase of performance the clipping is still a bottleneck of any graphical system. So its implementation in hardware is essential for real time applications. In this paper clipping operation is discussed and a hardware implementation of the line clipping algorithm is presented and finally formulated and tested using Field Programmable Gate Arrays (FPGA. The designed hardware unit consists of two parts : the first is positional code generator unit and the second is the clipping unit. Finally it is worth mentioning that the  designed unit is capable of clipping (232524 line segments per second.       

  5. Clustered atom-replaced structure in single-crystal-like metal oxide

    Science.gov (United States)

    Araki, Takeshi; Hayashi, Mariko; Ishii, Hirotaka; Yokoe, Daisaku; Yoshida, Ryuji; Kato, Takeharu; Nishijima, Gen; Matsumoto, Akiyoshi

    2018-06-01

    By means of metal organic deposition using trifluoroacetates (TFA-MOD), we replaced and localized two or more atoms in a single-crystalline structure having almost perfect orientation. Thus, we created a new functional structure, namely, clustered atom-replaced structure (CARS), having single-crystal-like metal oxide. We replaced metals in the oxide with Sm and Lu and localized them. Energy dispersive x-ray spectroscopy results, where the Sm signal increases with the Lu signal in the single-crystalline structure, confirm evidence of CARS. We also form other CARS with three additional metals, including Pr. The valence number of Pr might change from 3+ to approximately 4+, thereby reducing the Pr–Ba distance. We directly observed the structure by a high-angle annular dark-field image, which provided further evidence of CARS. The key to establishing CARS is an equilibrium chemical reaction and a combination of additional larger and smaller unit cells to matrix cells. We made a new functional metal oxide with CARS and expect to realize CARS in other metal oxide structures in the future by using the above-mentioned process.

  6. Better Buildings Alliance, Advanced Rooftop Unit Campaign: Rooftop Unit Measurement and Verification (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    This document provides facility managers and building owners an introduction to measurement and verification (M&V) methods to estimate energy and cost savings of rooftop units replacement or retrofit projects to estimate paybacks or to justify future projects.

  7. SI units in radiation protection

    International Nuclear Information System (INIS)

    Herrmann, D.

    1976-10-01

    In the field of radiation protection all hitherto used units for activity, activity concentrations, exposure, absorbed dose, and dose rates have to be replaced by SI units during the next years. For this purpose graphs and conversion tables are given as well as recommendations on unit combinations preferentially to be used. As to the dose equivalent, it is suggested to introduce a new special unit being 100 times greater than the rem, instead of maintaining the rem or using the gray for both absorbed dose and dose equivalent. Measures and time schedule relating to the gradual transition to SI units in measuring techniques, training, and publishing et cetera are explained. (author)

  8. Patients Unicondylar Knee Replacement vs. Total Knee Replacement

    OpenAIRE

    Hedra Eskander

    2017-01-01

    The aim of this review article is to analyse the clinical effectiveness of total knee replacement (TKR) compared to unicondylar knee replacement (UKR) on patients. In terms of survival rates, revision rates and postoperative complications. The keywords used were: knee arthroplasty. Nearly three thousand articles were found on 25 August 2016. Of those, only twenty-five were selected and reviewed because they were strictly focused on the topic of this article. Compared with those who have TKR, ...

  9. Artificial Disc Replacement

    Science.gov (United States)

    ... Spondylolisthesis BLOG FIND A SPECIALIST Treatments Artificial Disc Replacement (ADR) Patient Education Committee Jamie Baisden The disc ... Disc An artificial disc (also called a disc replacement, disc prosthesis or spine arthroplasty device) is a ...

  10. Product Platform Replacements

    DEFF Research Database (Denmark)

    Sköld, Martin; Karlsson, Christer

    2012-01-01

    . To shed light on this unexplored and growing managerial concern, the purpose of this explorative study is to identify operational challenges to management when product platforms are replaced. Design/methodology/approach – The study uses a longitudinal field-study approach. Two companies, Gamma and Omega...... replacement was chosen in each company. Findings – The study shows that platform replacements primarily challenge managers' existing knowledge about platform architectures. A distinction can be made between “width” and “height” in platform replacements, and it is crucial that managers observe this in order...... to challenge their existing knowledge about platform architectures. Issues on technologies, architectures, components and processes as well as on segments, applications and functions are identified. Practical implications – Practical implications are summarized and discussed in relation to a framework...

  11. The EOP Visualization Module Integrated into the Plasma On-Line Nuclear Power Plant Safety Monitoring and Assessment System

    International Nuclear Information System (INIS)

    Hornaes, Arne; Hulsund, John Einar; Vegh, Janos; Major, Csaba; Horvath, Csaba; Lipcsei, Sandor; Kapocs, Gyoergy

    2001-01-01

    An ambitious project to replace the unit information systems (UISs) at the Hungarian Paks nuclear power plant was started in 1998-99. The basic aim of the reconstruction project is to install a modern, distributed UIS architecture on all four Paks VVER-440 units. The new UIS includes an on-line plant safety monitoring and assessment system (PLASMA), which contains a critical safety functions monitoring module and provides extensive operator support during the execution of the new, symptom-oriented emergency operating procedures (EOPs). PLASMA includes a comprehensive EOP visualization module, based on the COPMA-III procedure-handling software developed by the Organization for Economic Cooperation and Development, Halden Reactor Project. Intranet technology is applied for the presentation of the EOPs with the use of a standard hypertext markup language (HTML) browser as a visualization tool. The basic design characteristics of the system, with a detailed description of its user interface and functions of the new EOP display module, are presented

  12. Replacement

    Directory of Open Access Journals (Sweden)

    S. Radhakrishnan

    2014-03-01

    Full Text Available The fishmeal replaced with Spirulina platensis, Chlorella vulgaris and Azolla pinnata and the formulated diet fed to Macrobrachium rosenbergii postlarvae to assess the enhancement ability of non-enzymatic antioxidants (vitamin C and E, enzymatic antioxidants (superoxide dismutase (SOD and catalase (CAT and lipid peroxidation (LPx were analysed. In the present study, the S. platensis, C. vulgaris and A. pinnata inclusion diet fed groups had significant (P < 0.05 improvement in the levels of vitamins C and E in the hepatopancreas and muscle tissue. Among all the diets, the replacement materials in 50% incorporated feed fed groups showed better performance when compared with the control group in non-enzymatic antioxidant activity. The 50% fishmeal replacement (best performance diet fed groups taken for enzymatic antioxidant study, in SOD, CAT and LPx showed no significant increases when compared with the control group. Hence, the present results revealed that the formulated feed enhanced the vitamins C and E, the result of decreased level of enzymatic antioxidants (SOD, CAT and LPx revealed that these feeds are non-toxic and do not produce any stress to postlarvae. These ingredients can be used as an alternative protein source for sustainable Macrobrachium culture.

  13. Usage of Bone Replacement Grafts in Periodontics and Oral Implantology and Their Current Levels of Clinical Evidence - A Systematic Assessment.

    Science.gov (United States)

    Salem, Daliah; Natto, Zuhair; Elangovan, Satheesh; Karimbux, Nadeem

    2016-08-01

    The aim of this review is to evaluate the levels of clinical evidence for bone replacement grafts available in the United States for periodontics and oral implantology purposes. A search was performed using PubMed, the Cochrane Library, and Google Scholar for articles relating to the use of bone replacement grafts in implant and/or periodontics by two independent reviewers. Articles unrelated to the topic, not involving patients, not including abstracts, or in languages other than English were excluded. Selected articles were graded according to "levels of evidence" based on guidelines originally introduced by Wright et al. (2003). There was limited published peer-reviewed clinical literature available regarding US commercially available bone replacement grafts in periodontics and oral implantology. Of 144 bone replacement grafts available in the United States according to Avila-Ortiz et al. (2013), only 52 met the inclusion criteria. The majority of materials used were allografts (26 of 93 available in the United States), followed by alloplasts (15 of 30) and xenografts (11 of 21). Dental providers should be aware of the limited evidence that qualified for a strong rating supporting the clinical efficacy of these materials for periodontics and oral implantology purposes using the inclusion criteria selected in this study.

  14. Primary heat transport pump mechanical seal replacement strategy for Pickering B

    International Nuclear Information System (INIS)

    Chacinsi, V.

    1995-01-01

    Pickering Nuclear Generating Station is a CANDU PHWR eight unit station located on Lake Ontario. The station is divided into Pickering A (Units 1 to 4) and Pickering B (Units 5 to 8). Pickering B is the focus of this paper. Each unit is rated at 540 MWe. The Primary Heat Transport (PHT) system, which is used to cool the fuel, is divided into four quadrants. Each quadrant has four vertical Byron Jackson PHT main circulation pumps. Three pumps in each quadrant are required for normal operation, leaving one pump in each quadrant as a spare. Each Pickering PHT pump has a Byron Jackson Type SU two stage mechanical seal. The typical pressure breakdown across the seal is 8.7-4.5-1.0 MPa. Certain features of seal operation and the PHT system which influence seal replacement are discussed below. (author)

  15. Floppy disc units for data collection from neutron beam experiments

    International Nuclear Information System (INIS)

    Hall, J.W.

    1976-02-01

    The replacement of paper tape output facilities on neutron beam equipment on DIDO and PLUTO reactors by floppy discs will improve reliability and provide a more manageable data storage medium. The cost of floppy disc drives is about the same as a tape punch and printer and less than other devices such as a magnetic tape. Suitable floppy disc controllers are not at present available and a unit was designed as a directly pluggable replacement for paper tape punches. This design was taken as the basis in the development of a prototype unit for use in neutron beam equipment. The circuit operation for this prototype unit is described. (author)

  16. Replacement of Swiss "Attestations de fonctions"

    CERN Multimedia

    DG Unit

    2009-01-01

    The Swiss Permanent Mission has informed CERN that the "attestations de fonctions" issued to certain members of the personnel and the "attestations" issued to their family members will gradually be replaced by P-type "cartes de légitimation" (see specimen copies below). This card’s name, together with its more contemporary design compared with old-style "Attestations" issued in the 1970s, will make the holder’s daily life much easier, e.g. when crossing borders, renting accommodation or setting up a telephone line. The Users Office (PH Department) and the Cards Office (HR Department), which are responsible for handling requests for "cartes de légitimation", will provide information in due course on how they intend to organise the exchange of "attestations" (priority will be given to residents of Switzerland, in parti...

  17. Acute Respiratory Failure Induced by Magnesium Replacement in a 62-Year-Old Woman with Myasthenia Gravis.

    Science.gov (United States)

    Singh, Paramveer; Idowu, Olakunle; Malik, Imrana; Nates, Joseph L

    2015-10-01

    Magnesium is known to act at the neuromuscular junction by inhibiting the presynaptic release of acetylcholine and desensitizing the postsynaptic membrane. Because of these effects, magnesium has been postulated to potentiate neuromuscular weakness. We describe the case of a 62-year-old woman with myasthenia gravis and a metastatic thymoma who was admitted to our intensive care unit for management of a myasthenic crisis. The patient's neuromuscular weakness worsened in association with standard intravenous magnesium replacement, and the exacerbated respiratory failure necessitated intubation, mechanical ventilation, and an extended stay in the intensive care unit. The effect of magnesium replacement on myasthenia gravis patients has not been well documented, and we present this case to increase awareness and stimulate research. In addition, we discuss the relevant medical literature.

  18. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  19. Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado

    International Nuclear Information System (INIS)

    1993-05-01

    Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed

  20. Replacing lactose from calf milk replacers : effects on digestion and post-absorptive metabolism

    NARCIS (Netherlands)

    Gilbert, M.S.

    2015-01-01

    Summary PhD thesis Myrthe S. Gilbert

    Replacing lactose from calf milk replacers – Effects on digestion and post-absorptive metabolism

    Veal calves are fed milk replacer (MR) and solid feed. The largest part of the energy provided to veal calves

  1. Flued head replacement alternatives

    International Nuclear Information System (INIS)

    Smetters, J.L.

    1987-01-01

    This paper discusses flued head replacement options. Section 2 discusses complete flued head replacement with a design that eliminates the inaccessible welds. Section 3 discusses alternate flued head support designs that can drastically reduce flued head installation costs. Section 4 describes partial flued head replacement designs. Finally, Section 5 discusses flued head analysis methods. (orig./GL)

  2. The optimal hormonal replacement modality selection for multiple organ procurement from brain-dead organ donors.

    Science.gov (United States)

    Mi, Zhibao; Novitzky, Dimitri; Collins, Joseph F; Cooper, David Kc

    2015-01-01

    The management of brain-dead organ donors is complex. The use of inotropic agents and replacement of depleted hormones (hormonal replacement therapy) is crucial for successful multiple organ procurement, yet the optimal hormonal replacement has not been identified, and the statistical adjustment to determine the best selection is not trivial. Traditional pair-wise comparisons between every pair of treatments, and multiple comparisons to all (MCA), are statistically conservative. Hsu's multiple comparisons with the best (MCB) - adapted from the Dunnett's multiple comparisons with control (MCC) - has been used for selecting the best treatment based on continuous variables. We selected the best hormonal replacement modality for successful multiple organ procurement using a two-step approach. First, we estimated the predicted margins by constructing generalized linear models (GLM) or generalized linear mixed models (GLMM), and then we applied the multiple comparison methods to identify the best hormonal replacement modality given that the testing of hormonal replacement modalities is independent. Based on 10-year data from the United Network for Organ Sharing (UNOS), among 16 hormonal replacement modalities, and using the 95% simultaneous confidence intervals, we found that the combination of thyroid hormone, a corticosteroid, antidiuretic hormone, and insulin was the best modality for multiple organ procurement for transplantation.

  3. Dynamic analysis and vibration testing of CFRP drive-line system used in heavy-duty machine tool

    OpenAIRE

    Mo Yang; Lin Gui; Yefa Hu; Guoping Ding; Chunsheng Song

    2018-01-01

    Low critical rotary speed and large vibration in the metal drive-line system of heavy-duty machine tool affect the machining precision seriously. Replacing metal drive-line with the CFRP drive-line can effectively solve this problem. Based on the composite laminated theory and the transfer matrix method (TMM), this paper puts forward a modified TMM to analyze dynamic characteristics of CFRP drive-line system. With this modified TMM, the CFRP drive-line of a heavy vertical miller is analyzed. ...

  4. Implementing Replacement Cost Accounting

    Science.gov (United States)

    1976-12-01

    cost accounting Clickener, John Ross Monterey, California. Naval Postgraduate School http://hdl.handle.net/10945/17810 Downloaded from NPS Archive...Calhoun IMPLEMENTING REPLACEMENT COST ACCOUNTING John Ross CHckener NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS IMPLEMENTING REPLACEMENT COST ...Implementing Replacement Cost Accounting 7. AUTHORS John Ross Clickener READ INSTRUCTIONS BEFORE COMPLETING FORM 3. RECIPIENT’S CATALOG NUMBER 9. TYRE OF

  5. Survey of transmission line corridors. [Data on delays in transmission line construction

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-05

    The intent of this study is to determine the extent of delays experienced in planning and constructing transmission lines in the continental United States. The reasons for the delays are identified for each line studied and their effect on the total electrical system is sought. Data was collected for 136 different lines either recently built or currently under study. Statistics were developed for each line in several categories and comparisons of lines delayed were made by company, area served and generation capacity. From the study presented here it was found that: right-of-way acquisition procedures including condemnation and easement negotiation practices delay more projects than local, state and federal regulatory requirements combined; load growth reductions particularly in the east have reduced the impact of regulatory delays; the south, southeast and southwestern areas of the country experience fewer delays in constructing transmission lines than the more populated states, and the cost for corridor delays was responded to for only 17 of the 142 projects surveyed. By far the most costly delay is the expense of condemning land for transmission right-of-way.

  6. Editing Transgenic DNA Components by Inducible Gene Replacement in Drosophila melanogaster

    Science.gov (United States)

    Lin, Chun-Chieh; Potter, Christopher J.

    2016-01-01

    Gene conversions occur when genomic double-strand DNA breaks (DSBs) trigger unidirectional transfer of genetic material from a homologous template sequence. Exogenous or mutated sequence can be introduced through this homology-directed repair (HDR). We leveraged gene conversion to develop a method for genomic editing of existing transgenic insertions in Drosophila melanogaster. The clustered regularly-interspaced palindromic repeats (CRISPR)/Cas9 system is used in the homology assisted CRISPR knock-in (HACK) method to induce DSBs in a GAL4 transgene, which is repaired by a single-genomic transgenic construct containing GAL4 homologous sequences flanking a T2A-QF2 cassette. With two crosses, this technique converts existing GAL4 lines, including enhancer traps, into functional QF2 expressing lines. We used HACK to convert the most commonly-used GAL4 lines (labeling tissues such as neurons, fat, glia, muscle, and hemocytes) to QF2 lines. We also identified regions of the genome that exhibited differential efficiencies of HDR. The HACK technique is robust and readily adaptable for targeting and replacement of other genomic sequences, and could be a useful approach to repurpose existing transgenes as new genetic reagents become available. PMID:27334272

  7. Investigation of The regularities of the process and development of method of management of technological line operation within the process of mass raw mate-rials supply in terms of dynamics of inbound traffic of unit trains

    Directory of Open Access Journals (Sweden)

    Катерина Ігорівна Сізова

    2015-03-01

    Full Text Available Large-scale sinter plants at metallurgical enterprises incorporate highly productive transport-and-handling complexes (THC that receive and process mass iron-bearing raw materials. Such THCs as a rule include unloading facilities and freight railway station. The central part of the THC is a technological line that carries out operations of reception and unloading of unit trains with raw materials. The technological line consists of transport and freight modules. The latter plays a leading role and, in its turn, consists of rotary car dumpers and conveyor belts. This module represents a determinate system that carries out preparation and unloading operations. Its processing capacity is set in accordance with manufacturing capacity of the sinter plant. The research has shown that in existing operating conditions, which is characterized by “arrhythmia” of interaction between external transport operation and production, technological line of THC functions inefficiently. Thus, it secures just 18-20 % of instances of processing of inbound unit trains within set standard time. It was determined that duration of the cycle of processing of inbound unit train can play a role of regulator, under stochastic characteristics of intervals between inbound unit trains with raw materials on the one hand, and determined unloading system on the other hand. That is why evaluation of interdependence between these factors allows determination of duration of cycle of processing of inbound unit trains. Basing on the results of the study, the method of logistical management of the processing of inbound unit trains was offered. At the same time, real duration of processing of inbound unit train is taken as the regulated value. The regulation process implies regular evaluation and comparison of these values, and, taking into account different disturbances, decision-making concerning adaptation of functioning of technological line. According to the offered principles

  8. ON A FAIR MANIFOLD FARE RATING ON A LONG TRAFFIC LINE

    Directory of Open Access Journals (Sweden)

    Stanislav PALÚCH

    2017-06-01

    Full Text Available The paper studies the possibilities to design a fair manifold tariff on a long traffic line. If a single tariff is used on a long bus or railway line, passengers travelling long distances are favoured at the expense of those travelling short distances. The fairest approach to tariff is setting an individual tariff for every origin–destination relation of line stops that expresses real travel costs. However, sometimes the individual tariff is too complicated and is therefore replaced by double-, triple- or manifold tariff. This paper shows how to design a manifold tariff in order to minimize unfairness to passengers.

  9. Development of an on-line radon monitoring apparatus and design of the on-line radon monitoring platform based on CAN bus

    International Nuclear Information System (INIS)

    Guo Huiping; Lu Ning; Shang Aiguo; Zhou Chunlin; Chen Yingfen; Yu Hongwei

    2004-12-01

    For actual demand, an idea of 'on-line monitoring' is put forward as a way of radon monitoring, instead of traditional so called 'off-line monitoring'. In this way, the apparatus has some automatic functions such as continuous monitoring, real-time alarm; thereby, there is no need for operators' intervention in each monitoring process. With technique of hardware and software design in automation's field, the authors have successfully developed the prototype and finished the scale of it in a standard radon-chamber. This apparatus is composed of detector part and secondary-instrument. The detector part is made up of a passive diffusion collecting chamber, high voltage static electricity, semiconductor detector, charge-sensitive preamplifier and forming circuit. The secondary-instrument is actually a micro-controller system, which consists of a single-chip micro-controller cored measure-controlling unit, display unit, printing unit and alarming unit. Taking this apparatus as a cell, a 'on-line Radon Monitoring Platform' based on CAN bus has been put forward, which can realize multi-points environmental radioactivity real-time monitoring radioactivity and data process. (authors)

  10. Pipe replacement in a water supply network: coordinated versus uncoordinated replacement and budget effects

    NARCIS (Netherlands)

    Dijk, van D.; Hendrix, E.M.T.

    2016-01-01

    Operators of underground water supply networks are challenged with pipe replacement
    decisions, because pipes are subject to increased failure rates as they age and financial resources
    are often limited.We study the optimal replacement time and optimal number of pipe replacements
    such

  11. Flow-Control Unit For Nitrogen And Hydrogen Gases

    Science.gov (United States)

    Chang, B. J.; Novak, D. W.

    1990-01-01

    Gas-flow-control unit installed and removed as one piece replaces system that included nine separately serviced components. Unit controls and monitors flows of nitrogen and hydrogen gases. Designed for connection via fluid-interface manifold plate, reducing number of mechanical fluid-interface connections from 18 to 1. Unit provides increasing reliability, safety, and ease of maintenance, and for reducing weight, volume, and power consumption.

  12. Railroad Lines, US, 2015, NAVTEQ

    Data.gov (United States)

    U.S. Environmental Protection Agency — NAVTEQ Railroads for the United States. The Railroads layer contains Railroad features published as lines and polylines. Attributes for this layer include the name...

  13. Anesthetic implication of tricuspid valve replacement in a patient with acute intermittent porphyria

    Directory of Open Access Journals (Sweden)

    Kianoush Saberi

    2016-01-01

    Full Text Available Facing a patient with acute intermittent porphyria (AIP, there is narrow safety margin which circumscribe all the therapeutic actions including choice of drugs. This would become even more complicated when it comes to a stressful and drug-dependent process like a cardiopulmonary bypass. According to author′s researches, no specific AIP case of tricuspid valve (TV replacement is reported recently. Furthermore, fast-track anesthesia was safely used in this 37-year-old male known the case of AIP, who was a candidate for TV replacement and removing the port catheter. The patient was extubated subsequently, only 3 h after entering the Intensive Care Unit.

  14. Market-consistent valuation of a pension product with guarantee in line with Solvency II : An applied case study to improve knowledge about how rationality and stressed conditions with respect to market- and insurance risk will impact the balance sheet.

    OpenAIRE

    Berg, Isak; Stadig, Richard

    2016-01-01

    Traditional pension products have today been replaced by products that are linked directly to the unit value of some kind of investment portfolio. These products contribute to more vulnerable situations for insurance companies in terms of uncertainties of future obligations. This master thesis aims to create a general valuation model in line with Solvency II regulation, which is able to value the best estimate of the insurance liability. The model will use a state model, stochastic scenario g...

  15. Impact of few failure data on the opportunistic replacement policy for multi-component systems

    International Nuclear Information System (INIS)

    Laggoune, Radouane; Chateauneuf, Alaa; Aissani, Djamil

    2010-01-01

    In continuous operating units, the production loss is often very large during the system shut down. Their economic profitability is conditioned by the implementation of suitable maintenance policy that could increase the availability and reduce the operating costs. In this paper, an opportunistic replacement policy is proposed for multi-component series system in the context of data uncertainty, where the expected total cost per unit time is minimized under general lifetime distribution. When the system is down, either correctively or preventively, the opportunity to replace preventively non-failed components is considered. To deal with the problem of the small size of failure data samples, the Bootstrap technique is applied, in order to model the uncertainties in parameter estimates. The Weibull parameters are considered as random variables rather than just deterministic point estimates. A solution procedure based on Monte Carlo simulations with informative search method is proposed and applied to the optimization of preventive maintenance plan for a hydrogen compressor in an oil refinery.

  16. Influence of Total Knee Arthroplasty on Gait Mechanics of the Replaced and Non-Replaced Limb During Stair Negotiation.

    Science.gov (United States)

    Standifird, Tyler W; Saxton, Arnold M; Coe, Dawn P; Cates, Harold E; Reinbolt, Jeffrey A; Zhang, Songning

    2016-01-01

    This study compared biomechanics during stair ascent in replaced and non-replaced limbs of total knee arthroplasty (TKA) patients with control limbs of healthy participants. Thirteen TKA patients and fifteen controls performed stair ascent. Replaced and non-replaced knees of TKA patients were less flexed at contact compared to controls. The loading response peak knee extension moment was greater in control and non-replaced knees compared with replaced. The push-off peak knee abduction moment was elevated in replaced limbs compared to controls. Loading and push-off peak hip abduction moments were greater in replaced limbs compared to controls. The push-off peak hip abduction moment was greater in non-replaced limbs compared to controls. Future rehabilitation protocols should consider the replaced knee and also the non-replaced knee and surrounding joints. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. Experimental Research and Control Strategy of Pumped Storage Units Dispatching in the Taiwan Power System Considering Transmission Line Limits

    Directory of Open Access Journals (Sweden)

    Ming-Tse Kuo

    2013-07-01

    Full Text Available Taiwan’s power system is isolated and not supported by other interconnected systems. Consequently, the system frequency immediately reflects changes in the system loads. Pumped storage units are crucial for controlling power frequency. These units provide main or auxiliary capacities, reducing the allocation of frequency-regulating reserve (FRR and further reducing generation costs in system operations. Taiwan’s Longmen Nuclear Power Plant is set to be converted for commercial operations, which will significantly alter the spinning reserves in the power system. Thus, this study proposes a safe and economic pumped storage unit dispatch strategy. This strategy is used to determine the optimal FRR capacity and 1-min recovery frequency in a generator failure occurrence at the Longmen Power Plant. In addition, this study considered transmission capacity constraints and conducted power flow analysis of the power systems in Northern, Central, and Southern Taiwan. The results indicated that, in the event of a failure at Longmen Power Plant, the proposed strategy can not only recover the system frequency to an acceptable range to prevent underfrequency load-shedding, but can also mitigate transmission line overloading.

  18. Equipment for maintenance and repair of 900 MW PWR units in France

    International Nuclear Information System (INIS)

    Blary, F.; Castaing, C.; Haessig, M.

    1984-01-01

    As of March 1984, Electricite de France has been operating twenty-seven 900 MW PWR power units. To cut down unit unavailability and reduce the dosimetric requirements of maintenance staff, a wide range of special devices for inspecting and repairing equipment has been designed; details of 64 operational devices and a further 18 still being developed are given in a maintenance catalogue. This special equipment, together with maintenance and repair procedures, has been devised in collaboration with Framatome, the constructor of the nuclear island. One particular problem resolved was that of replacing the pins of the upper internals (UI) of 21 operational units, preventive measures having been taken at the other units. The strategy adopted consisted, first, in setting up a pin-changing workshop to enable the pins and guide tubes to be replaced separately and, second, in devising and applying wherever possible a method for partially replacing the guide tubes outside the critical path of the outage by means of a mobile pool known as the 'Aquarium'. (author)

  19. Combined miglustat and enzyme replacement therapy in two patients with type 1 Gaucher disease: two case reports.

    Science.gov (United States)

    Amato, Dominick; Patterson, Mary Anne

    2018-01-27

    Intravenous enzyme replacement therapy is a first-line therapy for Gaucher disease type 1, and substrate reduction therapy represents an oral treatment alternative. Both enzyme replacement therapy and substrate reduction therapy are generally used as monotherapies in Gaucher disease. However, one randomized study and several case reports have described combination therapy over short time periods. We report two female Gaucher disease type 1 patients of mainly Anglo-Saxon descent, where combined enzyme replacement therapy and miglustat substrate reduction therapy were administered to overcome refractory clinical symptoms. The first patient was diagnosed at age 17 and developed Gaucher disease-related bone manifestations that worsened despite starting imiglucerase enzyme replacement therapy. After switching to miglustat substrate reduction therapy, her bone symptoms improved, but she developed tremors and eventually switched back to enzyme replacement therapy. Miglustat was later recommenced in combination with ongoing enzyme replacement therapy due to continued bone pain, and her bone symptoms improved along with maintained visceral manifestations. Enzyme replacement therapy was subsequently tapered off and the patient has since been successfully maintained on miglustat. The second patient was diagnosed aged 3, and commenced imiglucerase enzyme replacement therapy aged 15. After 9 years on enzyme replacement therapy she switched to miglustat substrate reduction therapy and her core symptoms were maintained/stable for 3 years. Imiglucerase enzyme replacement therapy was later added as a boost to therapy and her symptoms were subsequently maintained over a 2.3-year period. However, miglustat was discontinued due to her relocation, necessitating an increase in enzyme replacement therapy dose. Overall, both patients benefited from combination therapy. While the majority of Gaucher disease type 1 patients will not need treatment with both substrate reduction therapy

  20. Gentilly-2 and Point Lepreau divider plate replacement

    International Nuclear Information System (INIS)

    Schneider, W.; McClellan, G.; Weston, S.

    1996-01-01

    The steam generators at Hydro Quebec's Gentilly-2 and New Brunswick Power's Point Lepreau Nuclear Plants have been in operation since 1983, and were built with primary divider plates of a bolted panel configuration. During a routine outage inspection at Gentilly-2, it was noted that two bolts had dislodged from the divider plate and were located lying in the primary head. Subsequent inspections revealed erosion damage to a a substantial number of divider plate bolts and to a lesser extent, to the divider plate itself. After further inspection and repair the units were returned to operation, however, it was determined that a permanent replacement of the primary divider plates was going to be necessary. Upon evaluation of various options, it was decided that the panel type divider plates would be replaced with a single piece floating design. The divider plate itself was to be of one piece all-welded arrangement to be constructed from individual panels to be brought in through the manways. In view of the strength limitations of the bolted attachment of the upper seat bar to the tubesheet, a new welded seat was was provided. To counteract erosion concerns, the new divider plate is fitted with erosion resistant inserts of weld buildup and with improved sealing features in order to minimize leakage and erosion. At an advanced stage in the design and manufacture of the components, the issue of divider plate strength during loss of coolant accident (LOCA) conditions came into focus. Analysis was performed to determine the strength and/or failure characteristics of the divider plate to a variety of small and large LOCA conditions. Subsequently, Point Lepreau decided to replace their divider plates to address LOCA concerns. The paper describes the diagnosis of the original divider plates and the design. manufacture, field mobilization, installation and subsequent operation of the replacement divider plates. (author)

  1. New York Power Authority/New York City Housing Authority refrigerator replacement program, first program year evaluation. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kinney, L.F.; Lewis, G. [Synertech Systems Corp., Syracuse, NY (United States); Pratt, R.G.; Miller, J. [Pacific Northwest National Lab., Richland, WA (United States)

    1997-08-01

    Acting as an energy services provider, the New York Power Authority (NYPA) has initiated a long-term project through which 20,000 refrigerators per year will be replaced with the most energy-efficient units possible in apartments managed by the New York City Housing Authority (NYCHA). Using bulk purchasing as an incentive to appliance manufacturers to produce energy-efficient refrigerators suitable for use in apartments, replaced in the first year of the program, which ended in December 1996. These units, kWh per year. Savings were determined by field testing and laboratory testing of 220 existing refrigerators and 56 newly-installed units. In the next program year, a 15.0-cubic-foot Maytag refrigerator, newly-designed in response to bulk purchasing incentives, is being installed. The new unit has a label rating of 437 kWh per year, 31 percent better than 1993 energy standards. Old refrigerators removed from apartments are {open_quotes}demanufactured{close_quotes} in an environmentally-appropriate way and both metals and refrigerants are recovered for reuse.

  2. Preliminary study of possible ORELA replacement options

    International Nuclear Information System (INIS)

    Olsen, D.K.; Martin, J.A.; Horen, D.J.

    1984-06-01

    Based on two conceptual design studies performed by the LANL Accelerator Technology Division, the possibilities in terms of accelerator systems for replacing ORELA with a more intense Maxwellian-type continuous-energy neutron source are summarized and discussed. The neutron intensities from ORELA are compared with those from existing or potential accelerator systems used for cross-section and condensed-matter studies. The best replacement options seem to involve a spallation source from 200- to 400-MeV protons on an ORELA-like target. Pulsing and intensity desiderata with such a source are discussed which correspond to a spectrum-averaged 100-fold improved figure of merit over ORELA for TOF measurements with only a tenfold increased source strength. Existing accelerator designs seem to be inadequate for such a source. Consequently, two conceptual designs were developed for this study by the LANL Accelerator Technology Division. The first conceptual design is for a 200-MeV large linac capable of accelerating 1.3 A during a macropulse; this linac standing alone could serve as an ORELA replacement source. The second conceptual design is for a much smaller 250-MeV PIGMI linac with a 28-mA macropulse current which feeds a proton accumulator ring and bunch-compressor transport line. This linac-ring-compressor (LIRIC) option would give a more cost-effective neutron source for cross-section measurements, whereas the large linac, or a modified version of it, would give a much simpler system more suitable for expansion. In particular, both conceptual designs would incorporate the present ORELA building and would provide approximately 100-fold improved neutron sources over ORELA for cross-section measurements. The total estimated cost of the LIRIC system would be $43M (1984), whereas the cost of the large linac would be about a factor of two more. 55 references, 11 figures, 19 tables

  3. Hip Replacement: MedlinePlus Health Topic

    Science.gov (United States)

    ... invasive hip replacement (Medical Encyclopedia) Also in Spanish Topic Image MedlinePlus Email Updates Get Hip Replacement updates ... replacement - precautions Minimally invasive hip replacement Related Health Topics Hip Injuries and Disorders National Institutes of Health ...

  4. Aorto-right atrial fistula after ascending aortic replacement or aortic value replacement

    International Nuclear Information System (INIS)

    Zhi Aihua; Dai Ruping; Jiang Shiliang; Lu Bin

    2012-01-01

    Objective: To evaluate the CT features of aorto-right atrial fistula after aortic valve replacement (AVR) or ascending aortic replacement. Methods: Eighty-seven patients with aortic-right atrial fistula underwent CT after operation. The CT features were retrospectively analyzed. Fistula was measured according to maximum width of the shunt. Results: Aorto-right atrial fistula was detected in 87 patients after aortic valve replacement or ascending aortic replacement by CT scan. Among them, 25 patients were diagnosed as mild aorto-right atrial fistula, 47 patients as moderate, and 15 patients as severe. Thirty-seven patients underwent follow-up CT.Among them, 10 patients with mild to moderate aorto-right atrial fistula were considered to have complete regression, 8 patients with mild aorto-right atrial fistula considered to have incomplete regression, 14 patients with mild to moderate aorto-right atrial fistula considered to have stable condition, and 5 patients with moderate aorto-right atrial fistula considered to have progression at the 3-month follow-up. Conclusion: CT is a useful tool for defining aorto-right atrial fistula after AVR or ascending aortic replacement and for evaluating it in follow-up. (authors)

  5. Re-Placing the Arts in Elementary School Curricula: An Interdisciplinary, Collaborative Action Research Project

    Science.gov (United States)

    Trent, Allen; Riley, Jorge-Ayn

    2009-01-01

    This article describes a collaborative action research project aimed at deliberately "re-placing" art in the elementary curriculum through targeted planning, implementation, and assessment of an art integrated unit in an urban 4th grade classroom. Findings and implications should be relevant to elementary teachers, administrators, art specialists,…

  6. Sub-Circuit Selection and Replacement Algorithms Modeled as Term Rewriting Systems

    Science.gov (United States)

    2008-12-16

    of Defense, or the United States Government . AFIT/GCO/ENG/09-02 Sub-circuit Selection and Replacement Algorithms Modeled as Term Rewriting Systems... unicorns and random programs”. Communications and Computer Networks, 24–30. 2005. 87 Vita Eric D. Simonaire graduated from Granite Baptist Church School in...Service to attend the Air Force Institute of Technol- ogy in 2007. Upon graduation, he will serve the federal government in an Information Assurance

  7. Minimally invasive aortic valve replacement

    DEFF Research Database (Denmark)

    Foghsgaard, Signe; Schmidt, Thomas Andersen; Kjaergard, Henrik K

    2009-01-01

    In this descriptive prospective study, we evaluate the outcomes of surgery in 98 patients who were scheduled to undergo minimally invasive aortic valve replacement. These patients were compared with a group of 50 patients who underwent scheduled aortic valve replacement through a full sternotomy...... operations were completed as mini-sternotomies, 4 died later of noncardiac causes. The aortic cross-clamp and perfusion times were significantly different across all groups (P replacement...... is an excellent operation in selected patients, but its true advantages over conventional aortic valve replacement (other than a smaller scar) await evaluation by means of randomized clinical trial. The "extended mini-aortic valve replacement" operation, on the other hand, is a risky procedure that should...

  8. Lifetime management of the nuclear units in France

    International Nuclear Information System (INIS)

    Combes, J-P.; Godin, R.

    1994-01-01

    A systematic design study entitled 'Lifetime Project' has been initiated at Electricite de France, to estimate, plan, and maximize the life span of the French PWR plants. It is estimated that the present units will have a lifetime of 30 to 50 years. The life of a unit will be determined by that of its components, by economic considerations (whether it is cheaper to repair or replace the unit), and by safety considerations, which may be affected by changing safety standards. A 'periodic safety reassessment' takes place about every ten years. A list of 18 critical components can be summarized by saying that the main concerns are: radiation embrittlement of and within the reactor vessel, the steam generators, the concrete containment (which can not be replaced), instrumentation and control. Examination of samples from decommissioned plants, such as Chooz A, will provide valuable evidence of mechanisms of degradation due to aging

  9. Weight-bearing radiography in total hip replacement

    International Nuclear Information System (INIS)

    Turula, K.B.; Haajanen, J.; Friberg, O.; Lindholm, T.S.; Tallroth, K.

    1985-01-01

    Serial anteroposterior (AP) radiographs of the weight-bearing pelvis and hips were taken of 29 patients with total hip replacement (THR). For constant positioning the patient stands with straight knees on a board with a block between the heels. A U-shaped mercury level strapped to the patient provides a horizontal reference line on the radiograph. On the average, individual variation of pelvic tilt in serial films was 1 0 and pelvic rotation 3.5 0 confirming satisfactory reproducibility. The horizontal reference enables estimation of pre- and postoperative leg length inequality (LLI) and of the angle of the acetabular cup (AA). Reproducibility allows assessment of the exact position of the femoral component and quantitative evaluation of radiolucency and bone resorption around the prosthetic implant in the follow-up of THR. (orig.)

  10. SAF line pellet gaging

    International Nuclear Information System (INIS)

    Jedlovec, D.R.; Bowen, W.W.; Brown, R.L.

    1983-10-01

    Automated and remotely controlled pellet inspection operations will be utilized in the Secure Automated Fabrication (SAF) line. A prototypic pellet gage was designed and tested to verify conformance to the functions and requirements for measurement of diameter, surface flaws and weight-per-unit length

  11. Inpatient Peripherally Inserted Central Venous Catheter Complications: Should Peripherally Inserted Central Catheter Lines Be Placed in the Intensive Care Unit Setting?

    Science.gov (United States)

    Martyak, Michael; Kabir, Ishraq; Britt, Rebecca

    2017-08-01

    Peripherally inserted central venous catheters (PICCs) are now commonly used for central access in the intensive care unit (ICU) setting; however, there is a paucity of data evaluating the complication rates associated with these lines. We performed a retrospective review of all PICCs placed in the inpatient setting at our institution during a 1-year period from January 2013 to December 2013. These were divided into two groups: those placed at the bedside in the ICU and those placed by interventional radiology in non-ICU patients. Data regarding infectious and thrombotic complications were collected and evaluated. During the study period, 1209 PICC line placements met inclusion criteria and were evaluated; 1038 were placed by interventional radiology in non-ICU patients, and 171 were placed at the bedside in ICU patients. The combined thrombotic and central line associated blood stream infection rate was 6.17 per cent in the non-ICU group and 10.53 per cent in the ICU group (P = 0.035). The thrombotic complication rate was 5.88 per cent in the non-ICU group and 7.60 per cent in the ICU group (P = 0.38), whereas the central line associated blood stream infection rate was 0.29 per cent in the non-ICU group and 2.92 per cent in the ICU group (P = 0.002). This study seems to suggest that PICC lines placed at the bedside in the ICU setting are associated with higher complication rates, in particular infectious complications, than those placed by interventional radiology in non-ICU patients. The routine placement of PICC lines in the ICU settings needs to be reevaluated given these findings.

  12. Partial knee replacement - slideshow

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/presentations/100225.htm Partial knee replacement - series—Normal anatomy To use the sharing ... A.M. Editorial team. Related MedlinePlus Health Topics Knee Replacement A.D.A.M., Inc. is accredited ...

  13. A new chemical formulation for control of dental unit water line contamination: An 'in vitro' and clinical 'study'

    Directory of Open Access Journals (Sweden)

    Dolci Giovanni

    2002-02-01

    Full Text Available Abstract Background Water delivered by dental units during routine dental practice is highly contaminated. The aim of this study is to evaluate the efficacy of a new chemical solution flushed through Dental Unit Water Lines (DUWL for the control of contamination inside dental units. Materials and methods Six old dental units equipped with a device designed to automatically flush disinfecting solutions through the water system (Castellini Autosteril were selected. Water samples from DUWL effluents were collected in each dental unit for 10 randomly selected days, before and after a 5 minute DUWL disinfecting cycle with TetraAcetylEthileneDiamine (TAED and persalt (Ster4spray produced by Farmec spa, and distributed by Castellini spa. Water samples were plated in R2A Agar and cultured at room temperature for 7 days, and the total number of heterotrophic microorganisms counted and expressed in Log10 CFU/mL A general linear model was fitted and multiple regression ANOVA for repeated measures was used for the statistical analysis. Results The mean contamination in DUWL effluent at baseline was 5.45 ± 0.35 CFU/mL (range 4.79 to 5.93 CFU/mL. When water samples were tested "in vitro" against the chemical, no growth of heterotrophic bacteria was detected after a 5 minute contact in any of the water samples tested. After undergoing a 5 minute disinfecting cycle with the chemical, DUWL mean contamination in water effluents was 2.01 ± 0.32 CFU/mL (range 1.30 to 2.74 CFU/mL (significant difference with respect to baseline. Conclusions An inbetween patient disinfecting procedure consisting of flushing DUWL with TAED and persalt equivalent to 0.26% peracetic acid could be useful in routine dental practice for cross-contamination control.

  14. 24 CFR 891.405 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.405....405 Replacement reserve. (a) Establishment of reserve. The Owner shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance and repair and replacement of capital items...

  15. Development and installation of a new on-line plant safety monitoring system for the Paks VVER-440 units

    International Nuclear Information System (INIS)

    Vegh, J.; Major, C.; Buerger, L.; Lipcsei, S.; Horvath, C.; Kapocs, G.; Eiler, J.; Hornaes, A.; Hulsund, J.E.

    2000-01-01

    The paper describes the architecture, modules, algorithms and human-machine interface of a new operator support system (OSS), which is integrated into the new, reconstructed Paks NPP plant computers. The main task of the new OSS is to perform continuous plant safety monitoring and assessment, it has the following basic functions: on-line evaluation and presentation of critical safety function (CSF) status trees, continuous evaluation and presentation of the actual safety status of the plant, displaying and browsing the new symptom-oriented EOPs, automatic displaying of those process signals which are quoted in the EOPs. The first version of the new operator support system was connected to the Paks NPP full scope simulator in October 1999. This configuration was later successfully applied for the simulator testing of the new symptom-oriented EOP set for the Paks NPP in November 1999. The installation process was continued in 2000: the new system started its operation on Unit 2 (June) and on Unit 1 (August), together with the reconstructed, new PCS. (author)

  16. Velocity- and acceleration-sensitive units in the trunk lateral line of the trout

    NARCIS (Netherlands)

    Kroese, A. B.; Schellart, N. A.

    1992-01-01

    1. The two main types of lateral line organs of lower vertebrates are the superficial neuromasts (SN), with a cupula that protrudes in the surrounding water, and the canal neuromasts (CN), located in the lateral line canal. The scales of the trunk lateral line canal of fish contain SNs as well as

  17. 24 CFR 880.602 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 880.602... Replacement reserve. (a) A replacement reserve must be established and maintained in an interest-bearing account to aid in funding extraordinary maintenance and repair and replacement of capital items. (1) Part...

  18. Osteoblast and osteoclast behaviors in the turnover of attachment bones during medaka tooth replacement.

    Science.gov (United States)

    Mantoku, Akiko; Chatani, Masahiro; Aono, Kazushi; Inohaya, Keiji; Kudo, Akira

    2016-01-15

    Tooth replacement in polyphyodont is a well-organized system for maintenance of homeostasis of teeth, containing the dynamic structural change in skeletal tissues such as the attachment bone, which is the supporting element of teeth. Histological analyses have revealed the character of tooth replacement, however, the cellular mechanism of how skeletal tissues are modified during tooth replacement is largely unknown. Here, we showed the important role of osteoblasts for controlling osteoclasts to modify the attachment bone during tooth replacement in medaka pharyngeal teeth, coupled with an osterix-DsRed/TRAP-GFP transgenic line to visualize osteoblasts and osteoclasts. In the turnover of the row of attachment bones, these bones were resorbed at the posterior side where most developed functional teeth were located, and generated at the anterior side where teeth were newly erupted, which caused continuous tooth replacement. In the cellular analysis, osteoclasts and osteoblasts were located at attachment bones separately, since mature osteoclasts were localized at the resorbing side and osteoblasts gathered at the generating side. To demonstrate the role of osteoclasts in tooth replacement, we established medaka made deficient in c-fms-a by TALEN. c-fms-a deficient medaka showed hyperplasia of attachment bones along with reduced bone resorption accompanied by a low number of TRAP-positive osteoclasts, indicating an important role of osteoclasts in the turnover of attachment bones. Furthermore, nitroreductase-mediated osteoblast-specific ablation induced disappearance of osteoclasts, indicating that osteoblasts were essential for maintenance of osteoclasts for the proper turnover. Taken together, our results suggested that the medaka attachment bone provides the model to understand the cellular mechanism for tooth replacement, and that osteoblasts act in the coordination of bone morphology by supporting osteoclasts. Copyright © 2015 Elsevier Inc. All rights reserved.

  19. Inductive line energy storage generator

    Energy Technology Data Exchange (ETDEWEB)

    Choi, P [Ecole Polytechnique, Palaiseau (France). Laboratoire de Physique des Milieux Ionises

    1997-12-31

    The inductive energy storage (IES) generator has long been considered to be the most efficient system for energy usage in large pulsed power system at the MA level. A number of parameters govern the efficiency of energy transfer between the storage capacitors and the load, and the level of current deliverable to the load. For high power system, the energy storage capacitors are arranged as a Marx generator. The primary constraints are the inductances in the various parts of the circuit, in particular, the upstream inductance between the Marx and the POS, and the downstream inductance between the POS and the load. This paper deals with the effect of replacing part of the upstream inductance with a transmission line and introduces the new concept of an inductive line for energy storage (ILES). Extensive parametric scans were carried out on circuit simulations to investigate the effect of this upstream transmission line. A model was developed to explain the operation of the ILES design based on the data obtained. Comparison with an existing IES generator shows that the ILES design offers a significant improvement in the maximum current and hence energy delivered to an inductive load. (author). 5 figs., 1 ref.

  20. 24 CFR 891.855 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserves. 891.855... § 891.855 Replacement reserves. (a) The mixed-finance owner shall establish and maintain a replacement... the funds will be used to pay for capital replacement costs for the Section 202 or 811 supportive...

  1. Atlas transmission line breakdown analysis

    CERN Document Server

    Nielsen, K E; Ballard, E O; Elizondo, J M; Gribble, R F; McCuistian, B T; Parsons, W M

    1999-01-01

    The Atlas facility will use 24 radially converging, vertically oriented and tapered, oil insulated, triplate transmission lines between the Marx generators and the central load region. Among the requirements of the transmission lines are low inductance and high reliability. The inter-conductor gap is nominally 2 cm and the lines taper from a height of 1.75 m at the Marx end to 0.32 m at the output end. The aluminum conductors, held together by 20 insulating spacers, are assembled and inserted as a unit into radial oil-filled steel tanks. The negative, high-voltage, center conductor is 2.54-cm thick and the outer ground conductors are 1.59-cm thick. All 24 triplate transmission lines connect to a transition section at near 1 m radius that couples the transmission lines to a disk/conical solid- dielectric-insulated power flow channel transmission line terminating at the load. Peak operating voltage on the lines can be as high as 240 kV with an effective stress time of 0.8 mu s. Testing of small sections of the ...

  2. New steam generators slated for nuclear units

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This article is a brief discussion of Duke Power's plans to replace steam generators at its McGuire and Catawba nuclear units. A letter of intent to purchase (from Babcock and Wilcox) the 12 Westinghouse steam generators has been signed, but no constructor has been selected at this time. This action is brought about by the failures of more than 3000 tubes in these units

  3. 25 CFR 700.53 - Dwelling, replacement.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Dwelling, replacement. 700.53 Section 700.53 Indians THE... Policies and Instructions Definitions § 700.53 Dwelling, replacement. The term replacement dwelling means a dwelling selected by the head of a household as a replacement dwelling that meets the criteria of this...

  4. Finding a solution: Heparinised saline versus normal saline in the maintenance of invasive arterial lines in intensive care.

    Science.gov (United States)

    Everson, Matthew; Webber, Lucy; Penfold, Chris; Shah, Sanjoy; Freshwater-Turner, Dan

    2016-11-01

    We assessed the impact of heparinised saline versus 0.9% normal saline on arterial line patency. Maintaining the patency of arterial lines is essential for obtaining accurate physiological measurements, enabling blood sampling and minimising line replacement. Use of heparinised saline is associated with risks such as thrombocytopenia, haemorrhage and mis-selection. Historical studies draw variable conclusions but suggest that normal saline is at least as effective at maintaining line patency, although recent evidence has questioned this. We conducted a prospective analysis of the use of heparinised saline versus normal saline on unselected patients in the intensive care of our hospital. Data concerning duration of 471 lines insertion and reason for removal was collected. We found a higher risk of blockage for lines flushed with normal saline compared with heparinised saline (RR = 2.15, 95% CI 1.392-3.32, p  ≤ 0.001). Of the 56 lines which blocked initially (19 heparinised saline and 37 normal saline lines), 16 were replaced with new lines; 5 heparinised saline lines and 11 normal saline lines were reinserted; 5 of these lines subsequently blocked again, 3 of which were flushed with normal saline. Our study demonstrates a clinically important reduction in arterial line longevity due to blockages when flushed with normal saline compared to heparinised saline. We have determined that these excess blockages have a significant clinical impact with further lines being inserted after blockage, resulting in increased risks to patients, wasted time and cost of resources. Our findings suggest that the current UK guidance favouring normal saline flushes should be reviewed.

  5. Could wind replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    This article aims at assessing the situation produced by a total replacement of nuclear energy by wind energy, while facing consumption demand at any moment, notably in December. The authors indicate the evolution of the French energy mix during December 2016, and the evolution of the rate between wind energy production and the sum of nuclear and wind energy production during the same month, and then give briefly some elements regarding necessary investments in wind energy to wholly replace nuclear energy. According to them, such a replacement would be ruinous

  6. Experimentally Evaluated Explosion Resistance and Performance of Destruction Unit in Multiple Detonation of Ammunition

    Directory of Open Access Journals (Sweden)

    P. A. Baskakov

    2016-01-01

    Full Text Available The paper presents results of development and experimental investigation of explosion resistance and destruction unit performance in multiple detonation of ammunition with an explosive weight up to 0.7 kg of TNT. A preliminary evaluation of the explosion resistance was carried out using a model of explosion resistance localizer, represented as a thick-walled tube. As a result of explosive tests, the nature and characteristics of tube deformation under repeated explosions have been revealed. The findings allowed us to develop the first embodiment of the destruction unit with a turning non-separable heater and a two-layer localizer, which was heated by the induction field. The explosive life tests have revealed the following drawbacks: low resource localizer, jamming rotating mechanism in contact with the splinters, and impossible replacement of damaged localizer. In the second embodiment of the destruction unit a plate-assembled easychange localizer is mounted on the heater, and it is heated by heat transfer from the core. Tests have shown that, with such a placement, the uniform heating of the localizer is not reached. This leads to incomplete destruction of ammunition. Besides, because of the low strength of the pins connecting the plates, occurrs their rapid destruction. Taking into consideration the shortcomings of the previous two designs, the third option of the destruction unit with a replaceable localizer and induction heating of a localizer has been designed. A localizer material having high mechanical strength at high temperatures and good ferromagnetic properties has been selected. The paper offers an all-metal localizer design with the thickest wall at the bottom that is the most damageable. The paper has experimentally determined a critical deformation of the localizer when destroying the ammunition with varying weight of explosive and defined the heater and bump resource. As a result, the work proposes the destruction unit design

  7. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  8. Refrigerant lines in split-type air conditioners

    Energy Technology Data Exchange (ETDEWEB)

    Rettenberger, P

    1979-01-01

    Condensator and evaporating units of split-type air conditioners are evaluated and filled with the refrigerant by the producer. The line systems are hermetically closed and prevent the loss of refrigerant and the penetration of moisture or dirt. The best installation method is the 'bendable lines'. They combine flexibility and easy installation with the advantages of the copper pipe. Several ducting systems and their connecting elements like couplings and valves are described, their installation is explained. These flexible systems are especially suitable for small air-condition plants of the split-type the evaporating unit of which is portable and can put where it is desired.

  9. Carbohydrates as Fat Replacers.

    Science.gov (United States)

    Peng, Xingyun; Yao, Yuan

    2017-02-28

    The overconsumption of dietary fat contributes to various chronic diseases, which encourages attempts to develop and consume low-fat foods. Simple fat reduction causes quality losses that impede the acceptance of foods. Fat replacers are utilized to minimize the quality deterioration after fat reduction or removal to achieve low-calorie, low-fat claims. In this review, the forms of fats and their functions in contributing to food textural and sensory qualities are discussed in various food systems. The connections between fat reduction and quality loss are described in order to clarify the rationales of fat replacement. Carbohydrate fat replacers usually have low calorie density and provide gelling, thickening, stabilizing, and other texture-modifying properties. In this review, carbohydrates, including starches, maltodextrins, polydextrose, gums, and fibers, are discussed with regard to their interactions with other components in foods as well as their performances as fat replacers in various systems.

  10. Replacement of heavy components of the Main Primary System (MPS). Recent innovations made by Framatome ANP

    International Nuclear Information System (INIS)

    Chanussot, J.M.; Thevenet, R.

    2006-01-01

    condition of the various penetrations (lateral or from above, for instrumentation, unloading, spraying, etc.): - Complete replacement of the component (including dissimilar metal welds, thermal sleeves and even a section of the surge line if necessary); - Bottom replacement; - Replacement of faulty penetrations only. Along with the regular replacement of molded Main Primary System elbows (SGR operations), the following actions have also been carried out: - Replacement of a half crossover leg (SGR-GR4, 2000); - Replacement of a cold leg section (RCLS) with a chemical and volume control system (CVCS) nozzle (SGR-FH1, 2002). In the future we predict work will be carried out on the pressurizer surge line (potentially carried out as part of a pressurizer changeover or as a stand-alone operation). This presentation will focus on the major innovations developed by Framatome ANP, aided by its international customers in order to carry out these primary component replacement operations as well and as quickly as possible. These innovations concern the following domains: - Hoisting and handling; - Metrology and topo-metry; - Machining and welding; - Automated operations in piping; - Operation management. In conclusion one stresses that to increase the lifetime of their nuclear plants, optimize outages and sometimes increase thermal and electrical power it is necessary to optimize the replacement of heavy primary components. To meet the operator needs, suppliers must in turn enhance their capacity and skills in terms of: - Providing near-turnkey services (supplies and work); - Orchestrating these operations (i.e. by performing the duties of an engineering department); - Providing services in a range of fields, from concrete to instrumentation and control, and even performance testing; - Being technically innovative in all of these areas. Since the 1990's, with the assistance of its worldwide customer base, Framatome ANP has been carrying out this approach thanks to its experience as a

  11. Novel chitosan/diclofenac coatings on medical grade stainless steel for hip replacement applications

    Science.gov (United States)

    Finšgar, Matjaž; Uzunalić, Amra Perva; Stergar, Janja; Gradišnik, Lidija; Maver, Uroš

    2016-05-01

    Corrosion resistance, biocompatibility, improved osteointegration, as well the prevention of inflammation and pain are the most desired characteristics of hip replacement implants. In this study we introduce a novel multi-layered coating on AISI 316LVM stainless steel that shows promise with regard to all mentioned characteristics. The coating is prepared from alternating layers of the biocompatible polysaccharide chitosan and the non-steroid anti-inflammatory drug (NSAID), diclofenac. Electrochemical methods were employed to characterize the corrosion behavior of coated and uncoated samples in physiological solution. It is shown that these coatings improve corrosion resistance. It was also found that these coatings release the incorporated drug in controlled, multi-mechanism manner. Adding additional layers on top of the as-prepared samples, has potential for further tailoring of the release profile and increasing the drug dose. Biocompatibility was proven on human-derived osteoblasts in several experiments. Only viable cells were found on the sample surface after incubation of the samples with the same cell line. This novel coating could prove important for prolongation of the application potential of steel-based hip replacements, which are these days often replaced by more expensive ceramic or other metal alloys.

  12. MATHEMATICAL MODEL AND METHODOLOGY FOR CALCULATION OF MINIMIZATION ON TURNING RADIUS OF TRACTOR UNIT WITH REPLACEABLE SUPPORTING AND MANEUVERING DEVICE

    Directory of Open Access Journals (Sweden)

    P. V. Zeleniy

    2016-01-01

    Full Text Available Smooth plowing with the help of reversible plows has replaced an enclosure method of soil treatment. The method may cause a formation of back ridges or open furrows. Due to this fact turnings of a tractor unit with a minimum radius required in order to ensure shuttle movements each time in the furrow of the preceding operating stroke have become a dominant type of turnings. Non-productive shift time is directly dependent on them and it is on the average 10–12 %, and it is up to 40 % in small contour areas with short run. Large non-productive time is connected with the desire to reduce headland width at field edges, and then a turning is made in several stages while using a complicated maneuvering. Therefore, an increase in efficiency of a plowing unit by means of minimization on its turning radius and execution of turning at one stage in the shortest possible time are considered as relevant objectives. In such a case it is necessary to take into account the fact that potential capabilities of universal tractors having established time-proved designs in respect of reduction of turning radius are practically at the end. So it is expedient to solve the matter at the expense of additional removable devices that ensure transformation of tractor wheel formula at the run end in order to reorient its position. Finally high quality plowing ensured by future-oriented reversible plows will be accompanied not only by output increase per shift, but also by decrease in headland width, their compaction and abrasion due to suspension systems and increase in productivity. The developed design having a novelty which proved by an invention patent and representing an additional supporting and maneuvering device significantly minimizes all the above-mentioned disadvantages and does not require any changes in tractor production design. Investigations have been carried on the following topic: “Minimization of turning radius for universal tractors by transformation

  13. Waterborne Transportation Lines of the United States 1987

    Science.gov (United States)

    1988-10-01

    BASE I YEAS I I COAST I TER I SEEIIII/II U/|I1I ED I IiiI POINT I LIIO-1 IRAO LINE-I I BUILT I VESSEL NAME ABA NUNSER I SUARD I TOR- IPAGEI OVER-IOVER...2001 I II I I I I I I I I l I I I I I I ! I I III (18) TOLEN RAPINE, INC. I I I I I 1 I I I I I I BASIL T 1503057 1 t613A33! 63.61 24.0! 7.5! 10001 1

  14. Development of automobile brake lining using pulverized cow hooves

    Directory of Open Access Journals (Sweden)

    Katsina C. BALA

    2016-06-01

    Full Text Available Asbestos has been used for so long as automobile brake lining material because of its good physical and chemical properties. However, due to the health hazard associated with its handling, it has lost favour and several alternative materials are being increasingly used. Asbestos-free brake lining was developed in this work using pulverized cow hooves along with epoxy resin, barium sulphate, graphite and aluminium oxide. This was with a view to exploiting the characteristics of cow hooves, which are largely discarded as waste materials to replace asbestos which has been found to be carcinogenic. Samples of brake linings were produced using compressive moulding in which the physical and mechanical properties of the samples were studied. The results obtained showed that proper bonding was achieved as the percentage by weight of epoxy resin increased and percentage by weight of pulverized cow hooves decreased. The hardness, compressive strength, coefficient of friction, water and oil absorption, relative density and wear rate of the brake linings were determined and compared with existing brake lining properties. The result indicates that pulverized cow hooves can be used as brake lining material for automobiles.

  15. The Mid-Hungarian line: a zone of repeated tectonic inversions

    Science.gov (United States)

    Csontos, László; Nagymarosy, András

    1998-11-01

    The Mid-Hungarian line is a major tectonic feature of the Intra-Carpathian area separating two terranes of different origin and tectonic structure. Although this tectonic line was known from borehole records, it has not been described in seismic sections. The study presents interpreted seismic lines crossing the supposed trace of the Mid-Hungarian line. These seismic sections show north-dipping normal faults and thrust faults as well as cross-cutting young strike-slip faults. A complex tectonic history is deduced, including intra-Oligocene-Early Miocene thrusting, Middle Miocene extension, local Late Miocene inversion and Late Miocene-Pliocene normal faulting and left-lateral wrenching. In the light of our seismic study we think that the best candidate for the Mid-Hungarian line is a north-dipping detachment fault beneath large masses of Neogene volcanics. The auxiliary structures to the north seen on seismic sections suggest that it moved as a south-vergent thrust fault during the Palaeogene-Early Miocene which later was reactivated as a set of normal faults. The northern Alcapa unit overrode the southern Tisza-Dacia unit along this fault zone. The same relative positions are observed in the northern termination of the line. Other structures along the supposed trace of the line are north-dipping normal- or strike-slip faults which frequently were reactivated as smaller thrust faults during the late Neogene. Palaeogene-Early Miocene thrusting along the line might be the result of the opposite Tertiary rotations of the two major units, as suggested by palaeomagnetic measurements and earlier models.

  16. Replacement of Swiss "Attestations de fonctions"

    CERN Multimedia

    DG Unit

    2009-01-01

    The Swiss Permanent Mission has informed CERN that the "attestations de fonctions" issued to certain members of the personnel and the "attestations" issued to their family members will gradually be replaced by P-type "cartes de légitimation" (see specimen copies in the printed Bulletin). This card’s name, together with its more contemporary design compared with old-style "Attestations" issued in the 1970s, will make the holder’s daily life much easier, e.g. when crossing borders, renting accommodation or setting up a telephone line. The Users Office (PH Department) and the Cards Office (HR Department), which are responsible for handling requests for "cartes de légitimation", will provide information in due course on how they intend to organise the exchange of "attestations" (priority will be given to residents of Switzerland, in particular those requiring a visa for the Schengen area). In this context, we remind you that the Swiss Permanent Mission is systematically in...

  17. [Survival in acute renal failure with conventional therapy or continuous replacement therapy].

    Science.gov (United States)

    Santibáñez-Velázquez, Martín; Sánchez-Montoya, Felipe; Alvirde-Gutiérrez, Luis

    2014-01-01

    To know the survival rate in patients with RIFLE I and II stages on acute renal failure, treated with supportive care or continuous renal replacement therapy with PRISMA machine, at an intensive care unit. There were included patients of both sexes, aged 16 to 69 years, with acute renal failure in RIFLE I and II stages and score of scale APACHE II lower than 36 points. The sample studied was divided in two groups: a group was treated with supportive care, and the other group received continuous renal replacement therapy via PRISMA machine. We compared mortality between both groups and the association with the RIFLE stages with Pearson's chi-squared test. The average score of the scale APACHE I was 14 points, and the probability of death was 15 %. The patients with acute renal failure RIFLE I were 54.5 % and RIFLE II 45.5 %, with mortality of 30.4 % and 38.8 %, respectively. Patients in RIFLE I stage who received supportive care and continuous replacement therapy had non-statistical differences in mortality (p = 0.356). The mortality in patients with acute renal failure in RIFLE II stage treated with continuous replacement therapy was higher (p = 0.000). Because of its accessibility and lower mortality, supportive care should be the initial procedure in patients with acute renal failure in RIFLE I and II stages.

  18. Correlations in the quantum theory of plasma line broadening

    International Nuclear Information System (INIS)

    Dufty, J.W.; Boercker, D.B.

    1976-01-01

    A unified theory of plasma line broadening is obtained from a quantum kinetic equation, paralleling existing results for a classical plasma. The atom-electron interactions are shielded by equilibrium electron correlation functions and a frequency dependent dielectric function. A 'ring' approximation is used to replace the classical plasma parameter expansion, for typical laboratory conditions. Atom-electron correlations are included as well as electron-electron correlations. (author)

  19. Radiation Source Replacement Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  20. Can photovoltaic replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    As the French law on energy transition for a green growth predicts that one third of nuclear energy production is to be replaced by renewable energies (wind and solar) by 2025, and while the ADEME proposes a 100 per cent renewable scenario for 2050, this paper proposes a brief analysis of the replacement of nuclear energy by solar photovoltaic energy. It presents and discusses some characteristics of photovoltaic production: production level during a typical day for each month (a noticeable lower production in December), evolution of monthly production during a year, evolution of the rate between nuclear and photovoltaic production. A cost assessment is then proposed for energy storage and for energy production, and a minimum cost of replacement of nuclear by photovoltaic is assessed. The seasonal effect is outlined, as well as the latitude effect. Finally, the authors outline the huge cost of such a replacement, and consider that public support to new photovoltaic installations without an at least daily storage mean should be cancelled

  1. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves

    NARCIS (Netherlands)

    Gilbert, M. S.; Pantophlet, A. J.; van den Borne, J. J. G. C.; Hendriks, W. H.; Schols, H. A.; Gerrits, W. J. J.

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on energy

  2. Dynamic Characteristics of Communication Lines with Distributed Parameters to Control the Throttle-controlled Hydraulic Actuators

    Directory of Open Access Journals (Sweden)

    D. N. Popov

    2015-01-01

    Full Text Available The article considers a mathematical model of the hydraulic line for remote control of electro-hydraulic servo drive (EHSD with throttle control. This type of hydraulic lines is designed as a backup to replace the electrical connections, which are used to control EHSD being remote from the site with devices located to form the control signals of any object. A disadvantage of electric connections is that they are sensitive to magnetic fields and thereby do not provide the required reliability of the remote control. Hydraulic lines have no this disadvantage and therefore are used in aircraft and other industrial systems. However, dynamic characteristics of hydraulic systems still have been investigated insufficiently in the case of transmitting control signals at a distance at which the signal may be distorted when emerging the wave processes.The article results of mathematical simulation, which are verified through physical experimentation, largely eliminate the shortcomings of said information.The mathematical model described in the paper is based on the theory of unsteady pressure compressible fluids. In the model there are formulas that provide calculation of frequency characteristics of the hydraulic lines under hydraulic oscillations of the laminar flow parameters of viscous fluid.A real mock-up of the system under consideration and an experimental ad hoc unit are used to verify the results of mathematically simulated hydraulic systems.Calculated logarithmic amplitude and phase frequency characteristics compared with those obtained experimentally prove, under certain conditions, the proposed theoretical method of calculation. These conditions have to ensure compliance with initial parameters of fluid defined under stationary conditions. The applied theory takes into consideration a non-stationary hydraulic resistance of the line when calculating frequency characteristics.The scientific novelty in the article material is presented in

  3. M112 Demolition Block Pack-Out Line Modernization

    Science.gov (United States)

    2010-03-01

    1 - Continue to use hot water bath, replacing the steam heating source from the Line B fuel-oil fired boiler with an electric boiler located at l...are manually placed in carriers on an overhead monorail conveyor at the Tipper Tie operation and automatically conveyed through the dip tank. Air...bagged pellets are then manually removed from the overhead monorail , dried with a hand towel, and placed in a holding tray for manual placement into

  4. Purification, crystallization, preliminary X-ray diffraction and molecular-replacement studies of great cormorant (Phalacrocorax carbo) haemoglobin

    International Nuclear Information System (INIS)

    Jagadeesan, G.; Malathy, P.; Gunasekaran, K.; Harikrishna Etti, S.; Aravindhan, S.

    2014-01-01

    The great cormorant hemoglobin has been isolated, purified and crystallized and the three dimensional structure is solved using molecular replacement technique. Haemoglobin is the iron-containing oxygen-transport metalloprotein that is present in the red blood cells of all vertebrates. In recent decades, there has been substantial interest in attempting to understand the structural basis and functional diversity of avian haemoglobins. Towards this end, purification, crystallization, preliminary X-ray diffraction and molecular-replacement studies have been carried out on cormorant (Phalacrocorax carbo) haemoglobin. Crystals were grown by the hanging-drop vapour-diffusion method using PEG 3350, NaCl and glycerol as precipitants. The crystals belonged to the trigonal system P3 1 21, with unit-cell parameters a = b = 55.64, c = 153.38 Å, β = 120.00°; a complete data set was collected to a resolution of 3.5 Å. Matthews coefficient analysis indicated that the crystals contained a half-tetramer in the asymmetric unit

  5. Purification, crystallization, preliminary X-ray diffraction and molecular-replacement studies of great cormorant (Phalacrocorax carbo) haemoglobin

    Energy Technology Data Exchange (ETDEWEB)

    Jagadeesan, G. [Presidency College, Chennai 600 005 (India); Malathy, P.; Gunasekaran, K. [University of Madras, Chennai 600 025 (India); Harikrishna Etti, S. [GKM College of Engineering and Technology, Kamaraj Salai, Chennai 600 063 (India); Aravindhan, S., E-mail: aravindhanpresidency@gmail.com [Presidency College, Chennai 600 005 (India)

    2014-10-25

    The great cormorant hemoglobin has been isolated, purified and crystallized and the three dimensional structure is solved using molecular replacement technique. Haemoglobin is the iron-containing oxygen-transport metalloprotein that is present in the red blood cells of all vertebrates. In recent decades, there has been substantial interest in attempting to understand the structural basis and functional diversity of avian haemoglobins. Towards this end, purification, crystallization, preliminary X-ray diffraction and molecular-replacement studies have been carried out on cormorant (Phalacrocorax carbo) haemoglobin. Crystals were grown by the hanging-drop vapour-diffusion method using PEG 3350, NaCl and glycerol as precipitants. The crystals belonged to the trigonal system P3{sub 1}21, with unit-cell parameters a = b = 55.64, c = 153.38 Å, β = 120.00°; a complete data set was collected to a resolution of 3.5 Å. Matthews coefficient analysis indicated that the crystals contained a half-tetramer in the asymmetric unit.

  6. Feeder replacement tooling and processes

    International Nuclear Information System (INIS)

    Mallozzi, R.; Goslin, R.; Pink, D.; Askari, A.

    2008-01-01

    Primary heat transport system feeder integrity has become a concern at some CANDU nuclear plants as a result of thinning caused by flow accelerated corrosion (FAC). Feeder inspections are indicating that life-limiting wall thinning can occur in the region between the Grayloc hub weld and second elbow of some outlet feeders. In some cases it has become necessary to replace thinned sections of affected feeders to restore feeder integrity to planned end of life. Atomic Energy of Canada Limited (AECL) and Babcock and Wilcox Canada Ltd. (B and W) have developed a new capability for replacement of single feeders at any location on the reactor face without impacting or interrupting operation of neighbouring feeders. This new capability consists of deploying trained crews with specialized tools and procedures for feeder replacements during planned outages. As may be expected, performing single feeder replacement in the congested working environment of an operational CANDU reactor face involves overcoming many challenges with respect to access to feeders, available clearances for tooling, and tooling operation and performance. This paper describes some of the challenges encountered during single feeder replacements and actions being taken by AECL and B and W to promote continuous improvement of feeder replacement tooling and processes and ensure well-executed outages. (author)

  7. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  8. Design verification for reactor head replacement

    International Nuclear Information System (INIS)

    Dwivedy, K.K.; Whitt, M.S.; Lee, R.

    2005-01-01

    This paper outlines the challenges of design verification for reactor head replacement for PWR plants and the program for qualification from the prospective of the utility design engineering group. This paper is based on the experience with the design confirmation of four reactor head replacements for two plants, and their interfacing components, parts, appurtenances, and support structures. The reactor head replacement falls under the jurisdiction of the applicable edition of the ASME Section XI code, with particular reference to repair/replacement activities. Under any repair/replacement activities, demands may be encountered in the development of program and plan for replacement due to the vintage of the original design/construction Code and the design reports governing the component qualifications. Because of the obvious importance of the reactor vessel, these challenges take on an added significance. Additional complexities are introduced to the project, when the replacement components are fabricated by vendors different from the original vendor. Specific attention is needed with respect to compatibility with the original design and construction of the part and interfacing components. The program for reactor head replacement requires evaluation of welding procedures, applicable examination, test, and acceptance criteria for material, welds, and the components. Also, the design needs to take into consideration the life of the replacement components with respect to the extended period of operation of the plant after license renewal and other plant improvements. Thus, the verification of acceptability of reactor head replacement provides challenges for development and maintenance of a program and plan, design specification, design report, manufacturer's data report and material certification, and a report of reconciliation. The technical need may also be compounded by other challenges such as widely scattered global activities and organizational barriers, which

  9. The hydroelectric power market in the United States

    International Nuclear Information System (INIS)

    2002-01-01

    The second-largest producer of hydroelectric power in the world is the United States, right after Canada. In the United States, 7.1 per cent of net electricity generation was attributed to hydroelectric power in 2000, which totalled 269 terawatt hours (TWh). Aging facilities, outdated technology in some facilities, a cumbersome licensing process, and increasing environmental demands from interest groups for the preservation of river systems and surrounding wildlife challenge the industry. Pacific Coast states, especially California, were faced with electric power shortages during the summer of 2001, due to low market prices, high power usage among consumers and drought. The problems with the deregulation of the electricity market were brought to light by these shortages. Legislation to restructure the electric power industry in 25 states had not been enacted as of January 2002. The purchase of more power from both Canada and the Mexico is being considered by the government of the United States, as is the creation of a national power grid to allow for power transmission throughout the country. The Canada-United States energy trade might be affected by such a move, and result in project construction opportunities for Canadian companies. Renewable energy sources must be responsible for the generation of 10 per cent of power generation levels by 2020, on a gradual basis as mandated by law. By 2005, New York City must purchase 10 per cent of its power from renewable energy sources, reaching 20 per cent by 2010. The repair and replacement of aging dam equipment, the development of advanced turbine technology to protect fish stocks and water quality, dam removal, the construction of power lines are all opportunities open to Canadian companies. 60 refs., 5 tabs

  10. How to achieve synergy between volume replacement and filling products for global facial rejuvenation.

    Science.gov (United States)

    Raspaldo, Hervé; Aziza, Richard; Belhaouari, Lakhdar; Berros, Philippe; Body, Sylvie; Galatoire, Olivier; Le Louarn, Claude; Michaud, Thierry; Niforos, François; Rousseaux, Isabelle; Runge, Marc; Taieb, Maryna

    2011-04-01

    The objective of this paper is to provide an expert consensus regarding facial rejuvenation using a combination of volume replacement (Juvéderm(®) VOLUMA(®)), filling products (Juvéderm(®) Ultra product line) and botulinum toxin. The Juvéderm product line exploits innovative 3-D technology, producing a range of cohesive, homogenous gels that produce predictable, long-lasting and natural results. The products are easy to use by practitioners and are well-tolerated by patients, and used in combination can provide additional benefits not achieved with one product alone. An assessment of facial anatomy and consideration of the aging process, as well as available treatment options, are also addressed in determining the best combination of products to use. Outcomes from a questionnaire and workshop sessions focusing on specific aspects of use of the Juvéderm product line and botulinum toxin in daily clinical practice are discussed, and recommendations for product use following debate amongst the experts are provided.

  11. Design concept of a pump stage with replaceable hydraulic components and prediction of its performance curves

    International Nuclear Information System (INIS)

    Lugova, S O; Knyazeva, E G; Tverdokhleb, I B; Kochevsky, A N

    2010-01-01

    In many cases, centrifugal pump units are expected to deliver the required performance under varying operating conditions. In particular, the pumps for oil extraction and transportation should deliver a constant head, although their capacity often changes during the life cycle. In order to keep the efficiency at a high level and not to replace a whole pump, the authors suggest to replace in such cases only hydraulic components of the pump (impellers and stationary sections of diffuser channels) that are to be installed in the same casing. The paper describes an approach for designing of radial-flow impellers and sections of diffuser channels to be used as replaceable. It allows for delivering a required head and providing a high efficiency in a wide range of capacities. The components intended for smaller capacities are featured with narrower flow passages. However, the dimensions of replaceable components are the same. The paper describes also a numerical simulation of fluid flow in a pump stage with two sets of replaceable radial-flow impellers and sections of diffuser channels. The CFD software used in this research is ANSYS CFX 11. Good correspondence of results is observed. Difference in flow pattern at various capacities and its influence on the performance curves delivered with replaceable components is demonstrated. Basing on the obtained results, the analysis of energy losses is presented.

  12. Diagenetic replacement of Micas by Carbonates

    NARCIS (Netherlands)

    Oele, E.

    1961-01-01

    In the Ordovician sandstones of the Cantabrian Mountains a replacement of the micas by carbonate minerals could be observed. The absence of metamorphic minerals suggests a diagenetic replacement. This is supported by the finding of the same type of replacement in some undisturbed Pliocene sediments

  13. Detection of oral streptococci in dental unit water lines after therapy with air turbine handpiece: biological fluid retraction more frequent than expected.

    Science.gov (United States)

    Petti, Stefano; Moroni, Catia; Messano, Giuseppe Alessio; Polimeni, Antonella

    2013-03-01

    Oral streptococci detected in water from dental unit water lines (DUWLs) are a surrogate marker of patients' biological fluid retraction during therapy. We investigated oral streptococci detection rate in DUWLs in a representative sample of private offices in real-life conditions. Samples of nondisinfected water (100 ml) were collected from the DUWL designated for the air turbine handpiece in 81 dental units, immediately after dental treatment of patients with extensive air turbine handpiece use. Water was filtered and plated on a selective medium for oral streptococci and, morphologically, typical colonies of oral streptococci were counted. The lowest detection limit was 0.01 CFU/ml. The oral streptococci detection rate was 72% (95% CI: 62-81%), with a mean level of 0.7 CFU/ml. Oral streptococci detection was not affected by handpiece age or dental treatment type, but was associated with dental unit age. Biological fluid retraction into DUWLs during patient treatment and, possibly, the risk for patient-to-patient blood- or air-borne pathogen transmission are more frequent than expected.

  14. Conduction Abnormalities and Permanent Pacemaker Implantation After Transcatheter Aortic Valve Replacement Using the Repositionable LOTUS Device: The United Kingdom Experience.

    Science.gov (United States)

    Rampat, Rajiv; Khawaja, M Zeeshan; Hilling-Smith, Roland; Byrne, Jonathan; MacCarthy, Philip; Blackman, Daniel J; Krishnamurthy, Arvindra; Gunarathne, Ashan; Kovac, Jan; Banning, Adrian; Kharbanda, Raj; Firoozi, Sami; Brecker, Stephen; Redwood, Simon; Bapat, Vinayak; Mullen, Michael; Aggarwal, Suneil; Manoharan, Ganesh; Spence, Mark S; Khogali, Saib; Dooley, Maureen; Cockburn, James; de Belder, Adam; Trivedi, Uday; Hildick-Smith, David

    2017-06-26

    The authors report the incidence of pacemaker implantation up to hospital discharge and the factors influencing pacing rate following implantation of the LOTUS bioprosthesis (Boston Scientific, Natick, Massachusetts) in the United Kingdom. Transcatheter aortic valve replacement (TAVR) is associated with a significant need for permanent pacemaker implantation. Pacing rates vary according to the device used. The REPRISE II (Repositionable Percutaneous Replacement of Stenotic Aortic Valve Through Implantation of Lotus Valve System) trial reported a pacing rate of 29% at 30 days after implantation of the LOTUS device. Data were collected retrospectively on 228 patients who had the LOTUS device implanted between March 2013 and February 2015 across 10 centers in the United Kingdom. Twenty-seven patients (12%) had pacemakers implanted pre-procedure and were excluded from the analysis. Patients were aged 81.2 ± 7.7 years; 50.7% were male. The mean pre-procedural QRS duration was 101.7 ± 20.4 ms. More than one-half of the cohort (n = 111, 55%) developed new left bundle branch block (LBBB) following the procedure. Permanent pacemakers were implanted in 64 patients (32%) with a median time to insertion of 3.0 ± 3.4 days. Chief indications for pacing were atrioventricular (AV) block (n = 46, 72%), or LBBB with 1st degree AV block (n = 11, 17%). Amongst those who received a pacemaker following TAVR the pre-procedural electrocardiogram findings included: No conduction disturbance (n = 41, 64%); 1st degree AV block (n = 10, 16%); right bundle branch block (n = 6, 9%) and LBBB (n = 5, 8%). LBBB (but not permanent pacemaker) occurred more frequently in patients who had balloon aortic valvuloplasty before TAVR (odds ratio [OR]: 1.25; p = 0.03). Pre-procedural conduction abnormality (composite of 1st degree AV block, hemiblock, right bundle branch block, LBBB) was independently associated with the need for permanent pacemaker (OR: 2.54; p = 0.048). The absence of

  15. A Centrifugal Contactor Design to Facilitate Remote Replacement

    International Nuclear Information System (INIS)

    Meikrantz, David H.; Law, Jack D.; Garn, Troy G.; Macaluso, Lawrence L.

    2011-01-01

    Advanced designs of nuclear fuel recycling and radioactive waste treatment plants are expected to include more ambitious goals for solvent extraction based separations including; higher separations efficiency, high-level waste minimization, and a greater focus on continuous processes to minimize cost and footprint. Therefore, Annular Centrifugal Contactors (ACCs) are destined to play a more important role for such future processing schemes. This work continues the development of remote designs for ACCs that can process the large throughputs needed for future nuclear fuel recycling and radioactive waste treatment plants. A three stage, 12.5 cm diameter rotor module has been constructed and is being evaluated for use in highly radioactive environments. This prototype assembly employs three standard CINC V-05 clean-in-place (CIP) units modified for remote service and replacement via new methods of connection for solution inlets, outlets, drain and CIP. Hydraulic testing and functional checks were successfully conducted and then the prototype was evaluated for remote handling and maintenance. Removal and replacement of the center position V-05R contactor in the three stage assembly was demonstrated using an overhead rail mounted PaR manipulator. Initial evaluation indicates a viable new design for interconnecting and cleaning individual stages while retaining the benefits of commercially reliable ACC equipment. Replacement of a single stage via remote manipulators and tools is estimated to take about 30 minutes, perhaps fast enough to support a contactor change without loss of process equilibrium. The design presented in this work is scalable to commercial ACC models from V-05 to V-20 with total throughput rates ranging from 20 to 650 liters per minute.

  16. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... request a replacement. The application must be accompanied by the required fee and submitted to the...

  17. 24 CFR 891.605 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.605... 8 Assistance § 891.605 Replacement reserve. (a) Establishment of reserve. The Borrower shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance, and repair and...

  18. Permanganate Degradation of Reillex HPQ Ion Exchange Resin for Use in HB-Line

    International Nuclear Information System (INIS)

    Walker, B.W.

    1999-01-01

    This study evaluated the use of Reillex TM HPQ resin as a replacement for the Ionac A-641 resin currently authorized for use in H B-Line. The study concentrated on the ability of the existing alkaline permanganate digestion process to convert spent resin for disposal

  19. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  20. Status of the ELIMED multidisciplinary and medical beam-line at ELI-Beamlines

    International Nuclear Information System (INIS)

    Romano, F; Cirrone, G A P; Cuttone, G; Schillaci, F; Scuderi, V; Amico, A; Candiano, G; Larosa, G; Leanza, R; Manna, R; Marchese, V; Milluzzo, G; Petringa, G; Pipek, J; Giordanengo, S; Guarachi, L F; Marchetto, F; Sacchi, R; Korn, G; Margarone, D

    2017-01-01

    Nowadays, one of the biggest challenges consists in using high intensity laser-target interaction to generate high-energy ions for medical purposes, eventually replacing the old paradigm of acceleration characterized by huge and complex machines. In order to investigate the feasibility of using laser-driven ion beams for multidisciplinary application, a dedicated beam transport line will be installed at the ELI-Beamlines facility in Prague (CZ), as a part of the User-oriented ELIMAIA beam-line dedicated to ion acceleration and their potential applications. The beam-line section dedicated to transport and dosimetric endpoints is called ELIMED (ELI-Beamlines MEDical and multidisciplinary applications) and will be developed by the INFN-LNS. (paper)

  1. Timing of renal replacement therapy and clinical outcomes in critically ill patients with severe acute kidney injury

    NARCIS (Netherlands)

    Bagshaw, Sean M.; Uchino, Shigehiko; Bellomo, Rinaldo; Morimatsu, Hiroshi; Morgera, Stanislao; Schetz, Miet; Tan, Ian; Bouman, Catherine; Macedo, Ettiene; Gibney, Noel; Tolwani, Ashita; Oudemans-van Straaten, Heleen M.; Ronco, Claudio; Kellum, John A.; French, Craig; Mulder, John; Pinder, Mary; Roberts, Brigit; Botha, John; Mudholkar, Pradeen; Holt, Andrew; Hunt, Tamara; Honoré, Patrick Maurice; Clerbaux, Gaetan; Schetz, Miet Maria; Wilmer, Alexander; Yu, Luis; Macedo, Ettiene V.; Laranja, Sandra Maria; Rodrigues, Cassio José; Suassuna, José Hermógenes Rocco; Ruzany, Frederico; Campos, Bruno; Leblanc, Martine; Senécal, Lynne; Gibney, R. T. Noel; Johnston, Curtis; Brindley, Peter; Tan, Ian K. S.; Chen, Hui De; Wan, Li; Rokyta, Richard; Krouzecky, Ales; Neumayer, Hans-Helmut; Detlef, Kindgen-Milles; Mueller, Eckhard; Tsiora, Vicky; Sombolos, Kostas; Mustafa, Iqbal; Suranadi, Iwayan; Bar-Lavie, Yaron; Nakhoul, Farid; Ceriani, Roberto; Bortone, Franco; Zamperetti, Nereo; Pappalardo, Federico; Marino, Giovanni; Calabrese, Prospero; Monaco, Francesco; Liverani, Chiara; Clementi, Stefano; Coltrinari, Rosanna; Marini, Benedetto; Fuke, Nobuo; Miyazawa, Masaaki; Katayama, Hiroshi; Kurasako, Toshiaki; Hirasaw, Hiroyuki; Oda, Shigeto; Tanigawa, Koichi; Tanaka, Keiichi; Oudemans-van Straaten, Helena Maria; de Pont, Anne-Cornelie J. M.; Bugge, Jan Frederik; Riddervold, Fridtjov; Nilsen, Paul Age; Julsrud, Joar; Teixeira e Costa, Fernando; Marcelino, Paulo; Serra, Isabel Maria; Yaroustovsky, Mike; Grigoriyanc, Rachik; Lee, Kang Hoe; Loo, Shi; Singh, Kulgit; Barrachina, Ferran; Llorens, Julio; Sanchez-Izquierdo-Riera, Jose Angel; Toral-Vazquez, Darío; Wizelius, Ivar; Hermansson, Dan; Gaspert, Tomislav; Maggiorini, Marco; Davenport, Andrew; Lombardi, Raúl; Llopart, Teresita; Venkataraman, Ramesh; Kellum, John; Murray, Patrick; Trevino, Sharon; Benjamin, Ernest; Hufanda, Jerry; Paganini, Emil; Warnock, David; Guirguis, Nabil

    2009-01-01

    The aim of this study is to evaluate the relationship between timing of renal replacement therapy (RRT) in severe acute kidney injury and clinical outcomes. This was a prospective multicenter observational study conducted at 54 intensive care units (ICUs) in 23 countries enrolling 1238 patients.

  2. The optimal hormonal replacement modality selection for multiple organ procurement from brain-dead organ donors

    Directory of Open Access Journals (Sweden)

    Mi Z

    2014-12-01

    Full Text Available Zhibao Mi,1 Dimitri Novitzky,2 Joseph F Collins,1 David KC Cooper3 1Cooperative Studies Program Coordinating Center, VA Maryland Health Care Systems, Perry Point, MD, USA; 2Department of Cardiothoracic Surgery, University of South Florida, Tampa, FL, USA; 3Thomas E Starzl Transplantation Institute, University of Pittsburgh, Pittsburgh, PA, USA Abstract: The management of brain-dead organ donors is complex. The use of inotropic agents and replacement of depleted hormones (hormonal replacement therapy is crucial for successful multiple organ procurement, yet the optimal hormonal replacement has not been identified, and the statistical adjustment to determine the best selection is not trivial. Traditional pair-wise comparisons between every pair of treatments, and multiple comparisons to all (MCA, are statistically conservative. Hsu’s multiple comparisons with the best (MCB – adapted from the Dunnett’s multiple comparisons with control (MCC – has been used for selecting the best treatment based on continuous variables. We selected the best hormonal replacement modality for successful multiple organ procurement using a two-step approach. First, we estimated the predicted margins by constructing generalized linear models (GLM or generalized linear mixed models (GLMM, and then we applied the multiple comparison methods to identify the best hormonal replacement modality given that the testing of hormonal replacement modalities is independent. Based on 10-year data from the United Network for Organ Sharing (UNOS, among 16 hormonal replacement modalities, and using the 95% simultaneous confidence intervals, we found that the combination of thyroid hormone, a corticosteroid, antidiuretic hormone, and insulin was the best modality for multiple organ procurement for transplantation. Keywords: best treatment selection, brain-dead organ donors, hormonal replacement, multiple binary endpoints, organ procurement, multiple comparisons

  3. Seeking an optimal renal replacement therapy for the chronic kidney disease epidemic: the case for on-line hemodiafiltration.

    Science.gov (United States)

    Gatti, Emanuele; Ronco, Claudio

    2011-01-01

    The prevalence of chronic kidney disease (CKD) can be expected to increase dramatically in the foreseeable future, with suggestions that it has already reached epidemic proportions. The inadequate supply of donor organs, aggravated by an aging patient population, necessitates provision of sustainable dialysis treatment modalities. These treatment modalities must not only be of established clinical efficacy and effectiveness, but must simultaneously circumvent any potential treatment disparities due to geographical, social or other concurring factors. Home therapies might represent a partial solution to the complex issue of seeking optimal strategies to cope with the CKD epidemic. However, self-care renal replacement therapy (RRT), such as peritoneal dialysis (PD) and home therapies, can only be applied to a limited portion of the CKD population. Consequently, in preparation for coping with this CKD epidemic, specific large-scale plans need to be made that involve optimization of treatments already in use for the majority of the population requiring RRT, e.g. hemodialysis (HD). Extracorporeal chronic HD relies heavily on technology for its clinical success. Like the choice of the treatment modality and the complete medical approach to CKD patient care, the particular selection of the various components of the extracorporeal circuit has a significant impact on the well-being and survival of the patients. We present a medical-technological assessment of how best to treat vast numbers of dialysis patients under the financial restraints that are predicted to become even more severe as CKD entrenches itself as a more 'permanent epidemic'. A treatment modality is proposed that optimally addresses--and resolves--the debilitating effects of uremia, as well as of key clinical conditions closely linked to it. This treatment modality successfully tackles the issues of patient well-being, efficacy, effectiveness, safety and patient-nursing staff convenience--all in relation to

  4. A condition-based maintenance policy with non-periodic inspections for a two-unit series system

    International Nuclear Information System (INIS)

    Castanier, B.; Grall, A.; Berenguer, C.

    2005-01-01

    This paper considers a condition-based maintenance policy for a two-unit deteriorating system. Each unit is subject to gradual deterioration and is monitored by sequential non-periodic inspections. It can be maintained by good as new preventive or corrective replacements. Every inspection or replacement entails a set-up cost and a component-specific unit cost but if actions on the two components are combined, the set-up cost is charged only once. A parametric maintenance decision framework is proposed to coordinate inspection/replacement of the two components and minimize the long-run maintenance cost of the system. A stochastic model is developed on the basis of the semi-regenerative properties of the maintained system state and the associated cost model is used to assess and optimize the performance of the maintenance model. Numerical experiments emphasize the interest of a control of the operation groupings

  5. Técnica de monitorado continuo (on – line para la evaluación del estado técnico de los turbogrupos de 64 y 100 MW. // Technique of continuous monitored (on - line for the evaluation of the technical state in steam turbine units of 64 and 100 MW.

    Directory of Open Access Journals (Sweden)

    F. de la Torre. Silva

    2001-04-01

    Full Text Available En este trabajo se presenta el resultado del estudio de factibilidad realizado a los turbogrupos de 64 y 100 MW de dosCentrales Termoeléctricas, sobre el empleo de técnicas de monitorado continuo “on line” para la evaluación del estadotécnico de estos turbogrupos.Palabras claves: Turbinas de vapor,vibraciones, monitorado continuo “on line”, diagnóstico.______________________________________________________________________Abstract:In this work an study of feasibility is presented. This study is carried out in steam turbine units of 64 and 100 MW, and show the use ofcontinuous monitored technique (on line for the evaluation of the technical state of these turbine units.Key Words: Steam turbines, vibrations, continuous monitoring on line, turbines supervision, Diagnosis,technical state evaluation.

  6. Ultrahigh-rate supercapacitors based on eletrochemically reduced graphene oxide for ac line-filtering

    Science.gov (United States)

    Sheng, Kaixuan; Sun, Yiqing; Li, Chun; Yuan, Wenjing; Shi, Gaoquan

    2012-02-01

    The recent boom in multifunction portable electronic equipments requires the development of compact and miniaturized electronic circuits with high efficiencies, low costs and long lasting time. For the operation of most line-powered electronics, alternating current (ac) line-filters are used to attenuate the leftover ac ripples on direct current (dc) voltage busses. Today, aluminum electrolytic capacitors (AECs) are widely applied for this purpose. However, they are usually the largest components in electronic circuits. Replacing AECs by more compact capacitors will have an immense impact on future electronic devices. Here, we report a double-layer capacitor based on three-dimensional (3D) interpenetrating graphene electrodes fabricated by electrochemical reduction of graphene oxide (ErGO-DLC). At 120-hertz, the ErGO-DLC exhibited a phase angle of -84 degrees, a specific capacitance of 283 microfaradays per centimeter square and a resistor-capacitor (RC) time constant of 1.35 milliseconds, making it capable of replacing AECs for the application of 120-hertz filtering.

  7. FMEF Electrical single line diagram and panel schedule verification process

    International Nuclear Information System (INIS)

    Fong, S.K.

    1998-01-01

    Since the FMEF did not have a mission, a formal drawing verification program was not developed, however, a verification process on essential electrical single line drawings and panel schedules was established to benefit the operations lock and tag program and to enhance the electrical safety culture of the facility. The purpose of this document is to provide a basis by which future landlords and cognizant personnel can understand the degree of verification performed on the electrical single lines and panel schedules. It is the intent that this document be revised or replaced by a more formal requirements document if a mission is identified for the FMEF

  8. 30 CFR 800.30 - Replacement of bonds.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Replacement of bonds. 800.30 Section 800.30... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER REGULATORY PROGRAMS § 800.30 Replacement... replacement performance bonds. Replacement of a performance bond pursuant to this section shall not constitute...

  9. 24 CFR 572.125 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ...) Homeownership Program Requirements-Implementation Grants § 572.125 Replacement reserves. (a) Purpose. A single replacement reserve may be established for the homeownership program only if HUD determines it is necessary to... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Replacement reserves. 572.125...

  10. Successful switch from enzyme replacement therapy to miglustat in an adult patient with type 1 Gaucher disease: a case report.

    Science.gov (United States)

    Giuffrida, Gaetano; Lombardo, Rita; Di Francesco, Ernesto; Parrinello, Laura; Di Raimondo, Francesco; Fiumara, Agata

    2016-11-08

    Gaucher disease is one of the most common lipid-storage disorders, affecting approximately 1 in 75,000 births. Enzyme replacement therapy with recombinant glucocerebrosidase is currently considered the first-line treatment choice for patients with symptomatic Gaucher disease type 1. Oral substrate reduction therapy is generally considered a second-line treatment option for adult patients with mild to moderate Gaucher disease type 1 who are unable or unwilling to receive lifelong intravenous enzyme infusions. The efficacy and safety of the oral substrate reduction therapy miglustat (Zavesca®) in patients with Gaucher disease type 1 have been established in both short-term clinical trials and long-term, open-label extension studies. Published data indicate that miglustat can be used as maintenance therapy in patients with stable Gaucher disease type 1 switched from previous enzyme replacement therapy. We report a case of a 44-year-old Caucasian man with Gaucher disease type 1 who was initially treated with enzyme replacement therapy but, owing to repeated cutaneous allergic reactions, had to be switched to miglustat after several attempts with enzyme replacement therapy. Despite many attempts, desensitization treatment did not result in improved toleration of imiglucerase infusions, and the patient became unwilling to continue with any intravenous enzyme replacement therapy. He subsequently agreed to switch to oral substrate reduction therapy with miglustat 100 mg twice daily titrated up to 100 mg three times daily over a short period. Long-term miglustat treatment maintained both hemoglobin and platelet levels within acceptable ranges over 8 years. The patient's spleen volume decreased, his plasma chitotriosidase levels stayed at reduced levels, and his bone mineral density findings have remained stable throughout follow-up. The patient's quality of life has remained satisfactory. Miglustat showed good gastrointestinal tolerability in this patient, and no

  11. Effect of the replacement of aspartic acid/glutamic acid residues with asparagine/glutamine residues in RNase He1 from Hericium erinaceus on inhibition of human leukemia cell line proliferation.

    Science.gov (United States)

    Kobayashi, Hiroko; Motoyoshi, Naomi; Itagaki, Tadashi; Suzuki, Mamoru; Inokuchi, Norio

    2015-01-01

    RNase He1 from Hericium erinaceus, a member of the RNase T1 family, has high identity with RNase Po1 from Pleurotus ostreatus with complete conservation of the catalytic sequence. However, the optimal pH for RNase He1 activity is lower than that of RNase Po1, and the enzyme shows little inhibition of human tumor cell proliferation. Hence, to investigate the potential antitumor activity of recombinant RNase He1 and to possibly enhance its optimum pH, we generated RNase He1 mutants by replacing 12 Asn/Gln residues with Asp/Glu residues; the amino acid sequence of RNase Po1 was taken as reference. These mutants were then expressed in Escherichia coli. Using site-directed mutagenesis, we successfully modified the optimal pH for enzyme activity and generated a recombinant RNase He1 that inhibited the proliferation of cells in the human leukemia cell line. These properties are extremely important in the production of anticancer biologics that are based on RNase activity.

  12. Nested separatrices in simple shear flows: the effect of localized disturbances on stagnation lines

    OpenAIRE

    Wilson, M.C.T.; Gaskell, P.H.; Savage, M.D.

    2005-01-01

    The effects of localized two-dimensional disturbances on the structure of shear flows featuring a stagnation line are investigated. A simple superposition of a planar Couette flow and Moffatt's [J. Fluid Mech. 18, 1--18 (1964)] streamfunction for the decay of a disturbance between infinite stationary parallel plates shows that in general the stagnation line is replaced by a chain of alternating elliptic and hyperbolic stagnation points with a separation equal to 2.78 times the half-gap betwee...

  13. Long-life slab replacement concrete.

    Science.gov (United States)

    2015-03-01

    This research was initiated following reports of high incidence of cracking on FDOT concrete pavement replacement : slab projects. Field slabs were instrumented for data acquisition from high-early-strength concrete pavement : replacement slabs place...

  14. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    Energy Technology Data Exchange (ETDEWEB)

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  15. Ingledow 500 kV substation : using mixed technology switchgear solutions for replacement

    Energy Technology Data Exchange (ETDEWEB)

    Wallner, C.; Glaubitz, P. [Siemens AG, Munich (Germany); Messinger, T. [British Columbia Transmission Corp., Vancouver, BC (Canada)

    2008-07-01

    The reliability of the 500 kV equipment at the Ingledow substation operated by BC Hydro Transmission System is of critical importance due to the energy interchange with the Bonneville Power Authority in the United States and the major role of the substation in serving the energy needs of British Columbia's densely populated Lower Mainland. Presently, the 500 kV switchyard includes 10 airblast circuit breakers and the associated current transformers which are all approaching their end of service-life. In response to environmental and safety concerns, the British Columbia Transmission Corporation adopted a policy whereby new oil-filled transformers are no longer acceptable, and the replacement of existing oil-filled transformers must be oil-free. The result is that the current transformers must be either bushing-type or sulphur-hexafluoride (SF6) type. The replacement strategies for the substation equipment consider economical, environmental and seismic issues. They have just as strong an influence on the decision process as the technical, operational and reliability aspects for the particular case or switchgear replacement in the transmission system. The Ingledow case demonstrates the advantages of using mixed technology switchgear, with its compact design flowing from gas insulated switchgear (GIS) for replacement of equipment in an outdoor switchyard. The advantages of the MTS in this case offer the possibility of future reconfiguration to improve the system reliability within the existing switchyard space. 3 refs., 5 figs.

  16. Replacement of steel parts with extruded aluminum alloys in an automobile

    Science.gov (United States)

    Daggula, Manikantha Reddy

    Over the past years, vehicle emissions have shown a negative impact on environment and human health. A new strategy has been used by automakers to reduce a vehicle's weight which significantly reduce fuel consumption and C02 emissions. A very light car consumes very less fuel as it needs to overcome less inertia, decreasing the required power to movie the vehicle. Reducing weight is the easiest way to increase fuel economy and making it by just 10% can increase its efficiency 6 to 8 percent. For a normal scale 80% of vehicles weight is shared among chassis, power train and other exterior components. Almost 60% of the vehicles weight is comprised of steel and the remaining is with cast and extruded aluminum and magnesium alloys. Our main aim is to look for the parts like Fuel tank holder, Fuel filler neck, Turbo inlet assembly, and Brake lines, Dash board frame which are made from steel and replace them with extruded aluminum alloys, to analyze a conventional rear wheel aluminum drive shaft and replace it with a new design and with a new aluminum alloy. The current project involves dismantling an automobile and looking for feasible steel parts and making samples, analyzing the hardness of the samples. These parts are optimally analyzed using Ansys Finite element analysis tool, these parts are subjected to the constraints such as three-point bending, tensile testing, hydrostatic pressure and also torsional stress action on the drive shaft, the deformation and stress are observed in these parts. The results show the current steel parts can be replaced with 3000 series aluminum alloy and the drive shaft can be replaced with new design with 6061-T6 Al-alloy which decreases 25% of the shaft weight.

  17. Large scale replacement of fuel channels in the Pickering CANDU reactor using a man-in-the-loop remote control system

    International Nuclear Information System (INIS)

    Stratton, D.

    1991-01-01

    Spar Aerospace Limited of Toronto is presently under contract to Ontario Hydro to design a Remote Manipulation and Control System (RMCS) to be used during the large scale replacement of the fuel channels in the Pickering A Nuclear Generating Station. The system is designed to support the replacement of all 390 fuel channels in each of the four reactors at the Pickering A station in a safe manner that minimizes worker radiation exposure and unit outage time

  18. 31 CFR 361.8 - Claim for replacement.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Claim for replacement. 361.8 Section... § 361.8 Claim for replacement. Claim for replacement shall be made in writing to the Secretary, to the..., Parkersburg, WV 26106-1328. The claim, accompanied by a recommendation regarding the manner of replacement...

  19. Effect of growth hormone replacement therapy on pituitary hormone secretion and hormone replacement therapies in GHD adults

    DEFF Research Database (Denmark)

    Hubina, Erika; Mersebach, Henriette; Rasmussen, Ase Krogh

    2004-01-01

    We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes.......We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes....

  20. 24 CFR 891.745 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.745... and Individuals-Section 162 Assistance § 891.745 Replacement reserve. The general requirements for the replacement reserve are provided in § 891.605. For projects funded under §§ 891.655 through 891.790, the...

  1. Procurement of replacement pressure vessels for MURR

    International Nuclear Information System (INIS)

    Meyer, W.A. Jr.; Edwards, C.B. Jr.; McKibben, J.C.; Schoone, A.R.

    1989-01-01

    The University of Missouri Research Reactor Facility (MURR) located in Columbia, Missouri, is the highest powered, highest steady-state flux university research reactor in the United States. The reactor is a 10-MW pressurized loop, in-pool-type, light-water-moderated, beryllium-reflected, flux trap reactor. MURR has a compact core (0.033 m 3 ) composed of eight fuel elements of the materials test reactor type arranged as an annular right circular cylinder between the inner and outer aluminum pressure vessels. Conservative engineering judgment resulted in the decision in 1988 to purchase new inner and outer pressure vessels. This paper details the difficulties encountered in procuring replacements for aluminum pressure vessels built to standards that are no longer applicable in attempting to meet nuclear standards that are not applicable to nonferrous material

  2. Optimization of station battery replacement

    International Nuclear Information System (INIS)

    Jancauskas, J.R.; Shook, D.A.

    1994-01-01

    During a loss of ac power at a nuclear generating station (including diesel generators), batteries provide the source of power which is required to operate safety-related components. Because traditional lead-acid batteries have a qualified life of 20 years, the batteries must be replaced a minimum of once during a station's lifetime, twice if license extension is pursued, and more often depending on actual in-service dates and the results of surveillance tests. Replacement of batteries often occurs prior to 20 years as a result of systems changes caused by factors such as Station Blackout Regulations, control system upgrades, incremental load growth, and changes in the operating times of existing equipment. Many of these replacement decisions are based on the predictive capabilities of manual design basis calculations. The inherent conservatism of manual calculations may result in battery replacements occurring before actually required. Computerized analysis of batteries can aid in optimizing the timing of replacements as well as in interpreting service test data. Computerized analysis also provides large benefits in maintaining the as-configured load profile and corresponding design margins, while also providing the capability of quickly analyze proposed modifications and response to internal and external audits

  3. Prolonged Intermittent Renal Replacement Therapy.

    Science.gov (United States)

    Edrees, Fahad; Li, Tingting; Vijayan, Anitha

    2016-05-01

    Prolonged intermittent renal replacement therapy (PIRRT) is becoming an increasingly popular alternative to continuous renal replacement therapy in critically ill patients with acute kidney injury. There are significant practice variations in the provision of PIRRT across institutions, with respect to prescription, technology, and delivery of therapy. Clinical trials have generally demonstrated that PIRRT is non-inferior to continuous renal replacement therapy regarding patient outcomes. PIRRT offers cost-effective renal replacement therapy along with other advantages such as early patient mobilization and decreased nursing time. However, due to lack of standardization of the procedure, PIRRT still poses significant challenges, especially pertaining to appropriate drug dosing. Future guidelines and clinical trials should work toward developing consensus definitions for PIRRT and ensure optimal delivery of therapy. Copyright © 2016 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  4. Heuristics comparison for u-shaped assembly line balancing in the apparel factory

    Directory of Open Access Journals (Sweden)

    Nuchsara Kriengkorakot

    2014-06-01

    Full Text Available In recent year, many industries have adopted a Just-in-time (JIT approach to manufacturing. One of the important changes resulting from JIT implementation is the replacement of the traditional straight lines with Ushaped assembly lines. The important characteristic of these new configurations is that multiskilled workers perform various tasks of different stations along the production line. This research is to improve the assembly line balancing in apparel factory in case study of T-shirt style 53287. The efficiency of production line was 55.48%, the factory balanced line with the traditional method in straight line. Then, the u-shaped assembly line balancing problem (UALBP is to be performed instead of straight line. By using the heuristics of Maximum Task Time, Minimum Task Time, Maximum Ranked Positional Weight (RPWmax and Greedy Randomized to determine the optimal solutions related to the number of stations and line efficiency. The results indicate that two heuristics have given the good solution which have produced by the use of Maximum Task Time and Greedy Randomized. The minimum number of stations have reduced from 17 stations to 11 stations in UALB and the line efficiency was increased from 55.48% to 85.75%. The U-line configuration frequently improves the line efficiency and has fewer work stations compared to the traditional lines.

  5. A Bayesian perspective on some replacement strategies

    International Nuclear Information System (INIS)

    Mazzuchi, Thomas A.; Soyer, Refik

    1996-01-01

    In this paper we present a Bayesian decision theoretic approach for determining optimal replacement strategies. This approach enables us to formally incorporate, express, and update our uncertainty when determining optimal replacement strategies. We develop relevant expressions for both the block replacement protocol with minimal repair and the age replacement protocol and illustrate the use of our approach with real data

  6. Controlling costs without compromising quality: paying hospitals for total knee replacement.

    Science.gov (United States)

    Pine, Michael; Fry, Donald E; Jones, Barbara L; Meimban, Roger J; Pine, Gregory J

    2010-10-01

    Unit costs of health services are substantially higher in the United States than in any other developed country in the world, without a correspondingly healthier population. An alternative payment structure, especially for high volume, high cost episodes of care (eg, total knee replacement), is needed to reward high quality care and reduce costs. The National Inpatient Sample of administrative claims data was used to measure risk-adjusted mortality, postoperative length-of-stay, costs of routine care, adverse outcome rates, and excess costs of adverse outcomes for total knee replacements performed between 2002 and 2005. Empirically identified inefficient and ineffective hospitals were then removed to create a reference group of high-performance hospitals. Predictive models for outcomes and costs were recalibrated to the reference hospitals and used to compute risk-adjusted outcomes and costs for all hospitals. Per case predicted costs were computed and compared with observed costs. Of the 688 hospitals with acceptable data, 62 failed to meet effectiveness criteria and 210 were identified as inefficient. The remaining 416 high-performance hospitals had 13.4% fewer risk-adjusted adverse outcomes (4.56%-3.95%; P costs ($12,773-$11,512; P costs. A payment system based on the demonstrated performance of effective, efficient hospitals can produce sizable cost savings without jeopardizing quality. In this study, 96% of total excess hospital costs resulted from higher routine costs at inefficient hospitals, whereas only 4% was associated with ineffective care.

  7. A Novel Fault Line Selection Method Based on Improved Oscillator System of Power Distribution Network

    Directory of Open Access Journals (Sweden)

    Xiaowei Wang

    2014-01-01

    Full Text Available A novel method of fault line selection based on IOS is presented. Firstly, the IOS is established by using math model, which adopted TZSC signal to replace built-in signal of duffing chaotic oscillator by selecting appropriate parameters. Then, each line’s TZSC decomposed by db10 wavelet packet to get CFB with the maximum energy principle, and CFB was solved by IOS. Finally, maximum chaotic distance and average chaotic distance on the phase trajectory are used to judge fault line. Simulation results show that the proposed method can accurately judge fault line and healthy line in strong noisy background. Besides, the nondetection zones of proposed method are elaborated.

  8. Transforming Normal Programs by Replacement

    NARCIS (Netherlands)

    Bossi, Annalisa; Pettorossi, A.; Cocco, Nicoletta; Etalle, Sandro

    1992-01-01

    The replacement transformation operation, already defined in [28], is studied wrt normal programs. We give applicability conditions able to ensure the correctness of the operation wrt Fitting's and Kunen's semantics. We show how replacement can mimic other transformation operations such as thinning,

  9. Replacement of sub-systems

    International Nuclear Information System (INIS)

    Rosen, S.E.

    1992-01-01

    This paper describes a number of quality aspects related to replacement of important systems or components in a nuclear power station. Reference is given to the steam generator replacement and power uprating performed at Ringhals 2 in Sweden in 1989. Since quality is a wide concept there has been put special emphasis in this paper to the important aspects that traditionally are not connected to quality. (author) 1 fig

  10. 77 FR 12241 - Smart Grid Trade Mission to the United Kingdom; London, United Kingdom, October 15-17, 2012

    Science.gov (United States)

    2012-02-29

    ... from the World Bank, the United Kingdom is the best place to do business in the EU and G8 countries... smart grid. Consequently, over $300 billion of investment is needed over the next ten years to replace... distributing ever increasing amounts of electricity from intermittent and geographically spread renewable...

  11. Transcatheter aortic-valve replacement with a self-expanding prosthesis.

    Science.gov (United States)

    Adams, David H; Popma, Jeffrey J; Reardon, Michael J; Yakubov, Steven J; Coselli, Joseph S; Deeb, G Michael; Gleason, Thomas G; Buchbinder, Maurice; Hermiller, James; Kleiman, Neal S; Chetcuti, Stan; Heiser, John; Merhi, William; Zorn, George; Tadros, Peter; Robinson, Newell; Petrossian, George; Hughes, G Chad; Harrison, J Kevin; Conte, John; Maini, Brijeshwar; Mumtaz, Mubashir; Chenoweth, Sharla; Oh, Jae K

    2014-05-08

    We compared transcatheter aortic-valve replacement (TAVR), using a self-expanding transcatheter aortic-valve bioprosthesis, with surgical aortic-valve replacement in patients with severe aortic stenosis and an increased risk of death during surgery. We recruited patients with severe aortic stenosis who were at increased surgical risk as determined by the heart team at each study center. Risk assessment included the Society of Thoracic Surgeons Predictor Risk of Mortality estimate and consideration of other key risk factors. Eligible patients were randomly assigned in a 1:1 ratio to TAVR with the self-expanding transcatheter valve (TAVR group) or to surgical aortic-valve replacement (surgical group). The primary end point was the rate of death from any cause at 1 year, evaluated with the use of both noninferiority and superiority testing. A total of 795 patients underwent randomization at 45 centers in the United States. In the as-treated analysis, the rate of death from any cause at 1 year was significantly lower in the TAVR group than in the surgical group (14.2% vs. 19.1%), with an absolute reduction in risk of 4.9 percentage points (upper boundary of the 95% confidence interval, -0.4; P<0.001 for noninferiority; P = 0.04 for superiority). The results were similar in the intention-to-treat analysis. In a hierarchical testing procedure, TAVR was noninferior with respect to echocardiographic indexes of valve stenosis, functional status, and quality of life. Exploratory analyses suggested a reduction in the rate of major adverse cardiovascular and cerebrovascular events and no increase in the risk of stroke. In patients with severe aortic stenosis who are at increased surgical risk, TAVR with a self-expanding transcatheter aortic-valve bioprosthesis was associated with a significantly higher rate of survival at 1 year than surgical aortic-valve replacement. (Funded by Medtronic; U.S. CoreValve High Risk Study ClinicalTrials.gov number, NCT01240902.).

  12. Beaver Valley Unit 1, United States of America, 2007. Annex III. Description of Selected Open Phase Events

    International Nuclear Information System (INIS)

    2016-01-01

    On 27 Nov. 2007, during a non-routine walkdown of the off-site switchyard to investigate line voltage differences, the licensee discovered that the Phase A conductor of a 138 kV off-site power circuit of the Beaver Valley Power Station Unit 1 had broken off in the switchyard. This break occurred between the off-site feeder breaker and the line running on-site to the A train system station service transformer, located inside the site security fence. The terminal broke on the switchyard side of a revenue-metering current transformer/voltage transformer installed in 2006 to track the station’s power usage through this line. During normal power operation, no appreciable current goes through this 138 kV line because the unit generator normally powers the station buses (loads). The licensee determined that the break on the 138 kV Phase A had occurred 26 days earlier and, therefore, had not been restored within 72 h as required by technical specifications.

  13. COLREGS Demarcation Lines for the United States as of July 2014

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — U.S. collision regulation boundaries are lines of demarcation delineating those waters upon which mariners shall comply with the International Regulations for...

  14. A full cost analysis of the replacement of Naval Base, Guantanamo Bay's Marine ground defense force by the fleet antiterrorism security team

    OpenAIRE

    Ordona, Placido C.

    2000-01-01

    Constrained defense budgets and manpower resources have motivated the United States Marine Corps and the United States Navy to seek initiatives that maximize the efficient use and allocation of these diminishing resources. One such initiative is the restructuring of the Marine security presence at Naval Station, Guantanamo Bay, Cuba, through the replacement of the 350 man Marine Ground Defense Force with a smaller, rotating unit consisting of two platoons from the Fleet Antiterrorism Security...

  15. Quad-Cities Station, Units 1 and 2. Annual report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated by Unit 1 was 2,246,757 MWh(e) with the generator on line 4,287.5 hrs while Unit 2 generated 1,729,147 MWh(e) with the generator on line 3,056.21 hrs. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, and experiments

  16. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  17. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  18. Unit commitment with probabilistic reserve: An IPSO approach

    International Nuclear Information System (INIS)

    Lee, Tsung-Ying; Chen, Chun-Lung

    2007-01-01

    This paper presents a new algorithm for solution of the nonlinear optimal scheduling problem. This algorithm is named the iteration particle swarm optimization (IPSO). A new index, called iteration best, is incorporated into particle swarm optimization (PSO) to improve the solution quality and computation efficiency. IPSO is applied to solve the unit commitment with probabilistic reserve problem of a power system. The outage cost as well as fuel cost of thermal units was considered in the unit commitment program to evaluate the level of spinning reserve. The optimal scheduling of on line generation units was reached while minimizing the sum of fuel cost and outage cost. A 48 unit power system was used as a numerical example to test the new algorithm. The optimal scheduling of on line generation units could be reached in the testing results while satisfying the requirement of the objective function

  19. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.

    1999-01-01

    As a consequences of the government decision in September 1997. ANSTO established a replacement research reactor project to manage the procurement of the replacement reactor through the necessary approval, tendering and contract management stages This paper provides an update of the status of the project including the completion of the Environmental Impact Statement. Prequalification and Public Works Committee processes. The aims of the project, management organisation, reactor type and expected capabilities are also described

  20. Optimal composition of fluid-replacement beverages.

    Science.gov (United States)

    Baker, Lindsay B; Jeukendrup, Asker E

    2014-04-01

    The objective of this article is to provide a review of the fundamental aspects of body fluid balance and the physiological consequences of water imbalances, as well as discuss considerations for the optimal composition of a fluid replacement beverage across a broad range of applications. Early pioneering research involving fluid replacement in persons suffering from diarrheal disease and in military, occupational, and athlete populations incurring exercise- and/or heat-induced sweat losses has provided much of the insight regarding basic principles on beverage palatability, voluntary fluid intake, fluid absorption, and fluid retention. We review this work and also discuss more recent advances in the understanding of fluid replacement as it applies to various populations (military, athletes, occupational, men, women, children, and older adults) and situations (pathophysiological factors, spaceflight, bed rest, long plane flights, heat stress, altitude/cold exposure, and recreational exercise). We discuss how beverage carbohydrate and electrolytes impact fluid replacement. We also discuss nutrients and compounds that are often included in fluid-replacement beverages to augment physiological functions unrelated to hydration, such as the provision of energy. The optimal composition of a fluid-replacement beverage depends upon the source of the fluid loss, whether from sweat, urine, respiration, or diarrhea/vomiting. It is also apparent that the optimal fluid-replacement beverage is one that is customized according to specific physiological needs, environmental conditions, desired benefits, and individual characteristics and taste preferences.

  1. Prototype unit for the air decontamination

    International Nuclear Information System (INIS)

    Garcia A, J.

    1991-01-01

    In this work it has the objective of to design and to manufacture an unit that took advantage of the filters of national production in appropriate form, and to offer a wide protection to the maintenance personnel that carries out the replacement, besides to be able to be installed in any position and to facilitate the adsorber installation

  2. Stand-replacing wildfires increase nitrification for decades in southwestern ponderosa pine forests.

    Science.gov (United States)

    Kurth, Valerie J; Hart, Stephen C; Ross, Christopher S; Kaye, Jason P; Fulé, Peter Z

    2014-05-01

    Stand-replacing wildfires are a novel disturbance within ponderosa pine (Pinus ponderosa) forests of the southwestern United States, and they can convert forests to grasslands or shrublands for decades. While most research shows that soil inorganic N pools and fluxes return to pre-fire levels within a few years, we wondered if vegetation conversion (ponderosa pine to bunchgrass) following stand-replacing fires might be accompanied by a long-term shift in N cycling processes. Using a 34-year stand-replacing wildfire chronosequence with paired, adjacent unburned patches, we examined the long-term dynamics of net and gross nitrogen (N) transformations. We hypothesized that N availability in burned patches would become more similar to those in unburned patches over time after fire as these areas become re-vegetated. Burned patches had higher net and gross nitrification rates than unburned patches (P < 0.01 for both), and nitrification accounted for a greater proportion of N mineralization in burned patches for both net (P < 0.01) and gross (P < 0.04) N transformation measurements. However, trends with time-after-fire were not observed for any other variables. Our findings contrast with previous work, which suggested that high nitrification rates are a short-term response to disturbance. Furthermore, high nitrification rates at our site were not simply correlated with the presence of herbaceous vegetation. Instead, we suggest that stand-replacing wildfire triggers a shift in N cycling that is maintained for at least three decades by various factors, including a shift from a woody to an herbaceous ecosystem and the presence of fire-deposited charcoal.

  3. Main Control Room Upgrade for Kori Unit 1 in Korea

    International Nuclear Information System (INIS)

    Ha, Jae Taeg; Choi, Moon Jae

    2014-01-01

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles

  4. Main Control Room Upgrade for Kori Unit 1 in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Taeg; Choi, Moon Jae [KEPCO, Daejeon (Korea, Republic of)

    2014-08-15

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles.

  5. Computer simulation of replacement sequences in copper

    International Nuclear Information System (INIS)

    Schiffgens, J.O.; Schwartz, D.W.; Ariyasu, R.G.; Cascadden, S.E.

    1978-01-01

    Results of computer simulations of , , and replacement sequences in copper are presented, including displacement thresholds, focusing energies, energy losses per replacement, and replacement sequence lengths. These parameters are tabulated for six interatomic potentials and shown to vary in a systematic way with potential stiffness and range. Comparisons of results from calculations made with ADDES, a quasi-dynamical code, and COMENT, a dynamical code, show excellent agreement, demonstrating that the former can be calibrated and used satisfactorily in the analysis of low energy displacement cascades. Upper limits on , , and replacement sequences were found to be approximately 10, approximately 30, and approximately 14 replacements, respectively. (author)

  6. Permanent Quadriplegia Following Replacement of Voice Prosthesis.

    Science.gov (United States)

    Ozturk, Kayhan; Erdur, Omer; Kibar, Ertugrul

    2016-11-01

    The authors presented a patient with quadriplegia caused by cervical spine abscess following voice prosthesis replacement. The authors present the first reported permanent quadriplegia patient caused by voice prosthesis replacement. The authors wanted to emphasize that life-threatening complications may be faced during the replacement of voice prosthesis. Care should be taken during the replacement of voice prosthesis and if some problems have been faced during the procedure patients must be followed closely.

  7. Structural considerations in steam generator replacement

    International Nuclear Information System (INIS)

    Bertheau, S.R.; Gazda, P.A.

    1991-01-01

    Corrosion of the tubes and tube-support structures inside pressurized water reactor (PWR) steam generators has led many utilities to consider a replacement of the generators. Such a project is a major undertaking for a utility and must be well planned to ensure an efficient and cost-effective effort. This paper discusses various structural aspects of replacement options, such as total or partial generator replacement, along with their associated pipe cuts; major structural aspects associated with removal paths through the equipment hatch or through an opening in the containment wall, along with the related removal processes; onsite movement and storage of the generators; and the advantages and disadvantages of the removal alternatives. This paper addresses the major structural considerations associated with a steam generator replacement project. Other important considerations (e.g., licensing, radiological concerns, electrical requirements, facilities for management and onsite administrative activities, storage and fabrication activities, and offsite transportation) are not discussed in this paper, but should be carefully considered when undertaking a replacement project

  8. Material Science in Cervical Total Disc Replacement

    Science.gov (United States)

    Pham, Martin H.; Mehta, Vivek A.; Tuchman, Alexander; Hsieh, Patrick C.

    2015-01-01

    Current cervical total disc replacement (TDR) designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti), and cobalt-chrome (CoCr). These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation. PMID:26523281

  9. Material Science in Cervical Total Disc Replacement.

    Science.gov (United States)

    Pham, Martin H; Mehta, Vivek A; Tuchman, Alexander; Hsieh, Patrick C

    2015-01-01

    Current cervical total disc replacement (TDR) designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti), and cobalt-chrome (CoCr). These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation.

  10. Special transfer lines for the spallation neutron source

    International Nuclear Information System (INIS)

    Lucas, A.T.; Schippl, K.

    1986-01-01

    Special transfer lines were required to transport supercritical hydrogen gas at 20 0 K and 1.5 MPa and liquid methane at 800 0 K and 0.4 MPa over a distance of about 18 m, to moderator vessels sited within a concrete shielded area. The moderator vessels (1 L and 1/2 L volume respectively) are built into shielding material surrounding the uranium target which produces high energy pulsed neutrons. Energies up to 400 W can be deposited in the cryogenic fluid, which the control system must be capable of handling within less than one minute. The flow rates were designed to be 500 cm 3 /sec for hydrogen and 220 cms 3 /sec for methane. In order to maintain biological shielding integrity the lines had to be as compact in cross section as possible, and replacable using remote handling techniques. As commonly used plastic materials could not be used for spacers etc, on account of their poor radiation resistance, new techniques had to be developed to meet the long term requirements of the lines

  11. 78 FR 50455 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Changes to...

    Science.gov (United States)

    2013-08-19

    ... Purification Return Line in order to maintain overpressure protection, replaces an isolation check valve in the CVS with an air operated globe valve, and separates the zinc and hydrogen injection lines. Part of the... modification which provides a spring-assisted check valve to the Reactor Coolant System Purification Return...

  12. Bottlenecks reduction using superconductors in high voltage transmission lines

    Directory of Open Access Journals (Sweden)

    Daloub Labib

    2016-01-01

    Full Text Available Energy flow bottlenecks in high voltage transmission lines known as congestions are one of the challenges facing power utilities in fast developing countries. Bottlenecks occur in selected power lines when transmission systems are operated at or beyond their transfer limits. In these cases, congestions result in preventing new power supply contracts, infeasibility in existing contracts, price spike and market power abuse. The “Superconductor Technology” in electric power transmission cables has been used as a solution to solve the problem of bottlenecks in energy transmission at high voltage underground cables and overhead lines. The increase in demand on power generation and transmission happening due to fast development and linked to the intensive usage of transmission network in certain points, which in turn, lead to often frequent congestion in getting the required power across to where it is needed. In this paper, a bottleneck in high voltage double overhead transmission line with Aluminum Conductor Steel Reinforced was modeled using conductor parameters and replaced by Gap-Type Superconductor to assess the benefit of upgrading to higher temperature superconductor and obtain higher current carrying capacity. This proved to reduce the high loading of traditional aluminum conductors and allow more power transfer over the line using superconductor within the same existing right-of-way, steel towers, insulators and fittings, thus reducing the upgrade cost of building new lines.

  13. The Synovial Lining and Synovial Fluid Properties after Joint Arthroplasty

    Directory of Open Access Journals (Sweden)

    Michael Shang Kung

    2015-05-01

    Full Text Available The lubrication of the cartilaginous structures in human joints is provided by a fluid from a specialized layer of cells at the surface of a delicate tissue called the synovial lining. Little is known about the characteristics of the fluids produced after a joint arthroplasty procedure. A literature review was carried out to identify papers that characterized the synovial lining and the synovial fluids formed after total hip or knee arthroplasty. Five papers about synovial lining histology and six papers about the lubricating properties of the fluids were identified. The cells making up the re-formed synovial lining, as well as the lining of interface membranes, were similar to the typical Type A and B synoviocytes of normal joints. The synovial fluids around joint replacement devices were typically lower in viscosity than pre-arthroplasty fluids but the protein concentration and phospholipid concentrations tended to be comparable, suggesting that the lining tissue function was preserved after arthroplasty. The widespread, long-term success of joint arthroplasty suggests that the lubricant formed from implanted joint synovium is adequate for good clinical performance in the majority of joints. The role the fluid plays in component wear or failure is a topic for future study.

  14. HASE - The Helsinki adaptive sample preparation line

    Energy Technology Data Exchange (ETDEWEB)

    Palonen, V., E-mail: vesa.palonen@helsinki.fi [Department of Physics, University of Helsinki, P.O. Box 43, FI-00014 (Finland); Pesonen, A. [Laboratory of Chronology, Finnish Museum of Natural History, P.O. Box 64, FI-00014 (Finland); Herranen, T.; Tikkanen, P. [Department of Physics, University of Helsinki, P.O. Box 43, FI-00014 (Finland); Oinonen, M. [Laboratory of Chronology, Finnish Museum of Natural History, P.O. Box 64, FI-00014 (Finland)

    2013-01-15

    We have designed and built an adaptive sample preparation line with separate modules for combustion, molecular sieve handling, CO{sub 2} gas cleaning, CO{sub 2} storage, and graphitization. The line is also connected to an elemental analyzer. Operation of the vacuum equipment, a flow controller, pressure sensors, ovens, and graphitization reactors are automated with a reliable NI-cRIO real-time system. Stepped combustion can be performed in two ovens at temperatures up to 900 Degree-Sign C. Depending on the application, CuO or O{sub 2}-flow combustion can be used. A flow controller is used to adjust the O{sub 2} flow and pressure during combustion. For environmental samples, a module for molecular sieve regeneration and sample desorption is attached to the line replacing the combustion module. In the storage module, CO{sub 2} samples can be stored behind a gas-tight diaphragm valve and either stored for later graphitization or taken for measurements with separate equipment (AMS gas ion source or a separate mass spectrometer). The graphitization module consists of four automated reactors, capable of graphitizing samples with masses from 3 mg down to 50 {mu}g.

  15. Pseudoislets as primary islet replacements for research: report on a symposium at King's College London, London UK.

    Science.gov (United States)

    Persaud, Shanta J; Arden, Catherine; Bergsten, Peter; Bone, Adrian J; Brown, James; Dunmore, Simon; Harrison, Moira; Hauge-Evans, Astrid; Kelly, Catriona; King, Aileen; Maffucci, Tania; Marriott, Claire E; McClenaghan, Neville; Morgan, Noel G; Reers, Christina; Russell, Mark A; Turner, Mark D; Willoughby, Emma; Younis, Mustafa Y G; Zhi, Z L; Jones, Peter M

    2010-01-01

    Laboratory-based research aimed at understanding processes regulating insulin secretion and mechanisms underlying β-cell dysfunction and loss in diabetes often makes use of rodents, as these processes are in many respects similar between rats/mice and humans. Indeed, a rough calculation suggests that islets have been isolated from as many as 150,000 rodents to generate the data contained within papers published in 2009 and the first four months of 2010. Rodent use for islet isolation has been mitigated, to a certain extent, by the availability of a variety of insulin-secreting cell lines that are used by researchers world-wide. However, when maintained as monolayers the cell lines do not replicate the robust, sustained secretory responses of primary islets which limits their usefulness as islet surrogates. On the other hand, there have been several reports that configuration of MIN6 β-cells, derived from a mouse insulinoma, as three-dimensional cell clusters termed ‘pseudoislets’ largely recapitulates the function of primary islet β-cells. The Diabetes Research Group at King’s College London has been using the MIN6 pseudoislet model for over a decade and they hosted a symposium on “Pseudoislets as primary islet replacements for research”, which was funded by the UK National Centre for the Replacement, Refinement and Reduction of Animals in Research (NC3Rs), in London on 15th and 16th April 2010. This small, focused meeting was conceived as an opportunity to consolidate information on experiences of working with pseudoislets between different UK labs, and to introduce the theory and practice of pseudoislet culture to laboratories working with islets and/or β-cell lines but who do not currently use pseudoislets. This short review summarizes the background to the development of the cell line-derived pseudoislet model, the key messages arising from the symposium and emerging themes for future pseudoislet research.

  16. Transmission Line Security Monitor: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  17. Isotopic meteoric line for Colombia

    International Nuclear Information System (INIS)

    Rodriguez N, Cesar O

    2004-01-01

    Isotope analyses from representative rainfall samples taken from different areas in Colombia were processed to yield the meteoric line. Stable isotope composition in precipitation reflects the effects of temperature, altitude and of the continental site, being affected by different sources of atmospheric humidity over the Colombian territory. There is a seasonal variation in isotopic composition of precipitation with grater σ deviation during the rainy season and lower values in the dry season. In coastal areas the variation is smaller and is more pronounced than at continental stations. Correlation between altitude and isotope content led to equations, which indicate, on a regional level, a change in isotopic composition with altitude, of about 0.5 σ units per 200 m, for O 18 and 4 σ units per 200 m for H 2 . Such equations may be used to identify the original altitude of precipitation water, in hydrological surface and groundwater studies. Meteoric line and the concepts derived from the resulting equations presented in this paper may be applied to the interpretation of isotope analysis in future hydrological studies, particularly in areas without available data

  18. Impact of water quality change on corrosion scales in full and partially replaced lead service lines

    Science.gov (United States)

    BackgroundChanges in water qualities have been associated with an increase in lead release from full and partial lead service lines (LSLs), such as the cases of Washington D.C. or more recently of Flint (Mi). Water qualities affect the mineralogy of the scales. Furthermore, follo...

  19. Neonatal varicella pneumonia, surfactant replacement therapy

    Directory of Open Access Journals (Sweden)

    Mousa Ahmadpour-kacho

    2015-12-01

    Full Text Available Background: Chickenpox is a very contagious viral disease that caused by varicella-zoster virus, which appears in the first week of life secondary to transplacental transmission of infection from the affected mother. When mother catches the disease five days before and up to two days after the delivery, the chance of varicella in neonate in first week of life is 17%. A generalized papulovesicular lesion is the most common clinical feature. Respiratory involvement may lead to giant cell pneumonia and respiratory failure. The mortality rate is up to 30% in the case of no treatment, often due to pneumonia. Treatment includes hospitalization, isolation and administration of intravenous acyclovir. The aim of this case report is to introduce the exogenous surfactant replacement therapy after intubation and mechanical ventilation for respiratory failure in neonatal chickenpox pneumonia and respiratory distress. Case Presentation: A seven-day-old neonate boy was admitted to the Neonatal Intensive Care Unit at Amirkola Children’s Hospital, Babol, north of Iran, with generalized papulovesicular lesions and respiratory distress. His mother has had a history of Varicella 4 days before delivery. He was isolated and given supportive care, intravenous acyclovir and antibiotics. On the second day, he was intubated and connected to mechanical ventilator due to severe pneumonia and respiratory failure. Because of sever pulmonary involvement evidenced by Chest X-Ray and high ventilators set-up requirement, intratracheal surfactant was administered in two doses separated by 12 hours. He was discharged after 14 days without any complication with good general condition. Conclusion: Exogenous surfactant replacement therapy can be useful as an adjunctive therapy for the treatment of respiratory failure due to neonatal chickenpox.

  20. Statistical mechanics of flux lines in high-temperature superconductors

    International Nuclear Information System (INIS)

    Dasgupta, C.

    1992-01-01

    The shortness of the low temperature coherence lengths of high T c materials leads to new mechanisms of pinning of flux lines. Lattice periodic modulations of the order parameters itself acts to pin vortex lines in regions of the unit cell were the order parameter is small. A presentation of flux creep and flux noise at low temperature and magnetic fields in terms of motion of simple metastable defects on flux lines is made, with a calculation of flux lattice melting. 12 refs

  1. Multiwire proportional counter (lecture by an electromagnetic delay line)

    International Nuclear Information System (INIS)

    Bruere-Dawson, R.

    1989-01-01

    For track localisation of ionizing particles with multiwire proportional chamber, an electronic chain including amplifying, shaping and memorizing circuits is required for each wire. In order to lower the cost of this type of detector, an electromagnetic delay line is proposed among various possibilities. In this paper, different coupling modes between chamber and delay line are studied with their respective advantages. The realization of one meter long delay line with a unit delay time of 15 ns per cm is also presented [fr

  2. Knee Replacement

    Science.gov (United States)

    ... days. Medications prescribed by your doctor should help control pain. During the hospital stay, you'll be encouraged to move your ... exercise your new knee. After you leave the hospital, you'll continue physical ... mobility and a better quality of life. And most knee replacements can be ...

  3. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  4. 30 CFR 75.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 75.1438 Section 75.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... attachment replacement. Wire rope attachments shall be replaced when cracked, deformed, or excessively worn. ...

  5. Development of Protection and Control Unit for Distribution Substation

    Science.gov (United States)

    Iguchi, Fumiaki; Hayashi, Hideyuki; Takeuchi, Motohiro; Kido, Mitsuyasu; Kobayashi, Takashi; Yanaoka, Atsushi

    The Recently, electronics and IT technologies have been rapidly innovated and have been introduced to power system protection & control system to achieve high reliability, maintainability and more functionality. Concerning the distribution substation application, digital relays have been applied for more than 10 years. Because of a number of electronic devices used for it, product cost becomes higher. Also, products installed during the past high-growth period will be at the end of lifetime and will be replaced. Therefore, replacing market is expected to grow and the reduction of cost is demanded. Considering above mentioned background, second generation digital protection and control unit as a successor is designed to have following concepts. Functional integration based on advanced digital technologies, Ethernet LAN based indoor communication network, cost reduction and downsizing. Pondering above concepts, integration of protection and control function is adopted in contrary to the functional segregation applied to the previous system in order to achieve one-unit concept. Also the adoption of Ethernet LAN for inter-unit communication is objective. This report shows the development of second-generation digital relay for distribution substation, which is equipped with control function and Ethernet LAN by reducing the size of auxiliary transformer unit and the same size as previous product is realized.

  6. Surry Power Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electric power generated by Unit 1 was 2,315,124 MWH(e) and Unit 2 generated 2,062,954 MWH(e) with Unit 1 generator on line for 3,157.8 hrs and Unit 2 on line for 2,881.2 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  7. First-line antiretroviral drug discontinuations in children.

    Directory of Open Access Journals (Sweden)

    Melony Fortuin-de Smidt

    Full Text Available There are a limited number of paediatric antiretroviral drug options. Characterising the long term safety and durability of different antiretrovirals in children is important to optimise management of HIV infected children and to determine the estimated need for alternative drugs in paediatric regimens. We describe first-line antiretroviral therapy (ART durability and reasons for discontinuations in children at two South African ART programmes, where lopinavir/ritonavir has been recommended for children <3 years old since 2004, and abacavir replaced stavudine as the preferred nucleoside reverse transcriptase inhibitor in 2010.We included children (<16 years at ART initiation who initiated ≥3 antiretrovirals between 2004-2014 with ≥1 follow-up visit on ART. We estimated the incidence of first antiretroviral discontinuation using Kaplan-Meier analysis. We determined the reasons for antiretroviral discontinuations using competing risks analysis. We used Cox regression to identify factors associated with treatment-limiting toxicity.We included 3579 children with median follow-up duration of 41 months (IQR 14-72. At ART initiation, median age was 44 months (IQR 13-89 and median CD4 percent was 15% (IQR 9-21%. At three and five years on ART, 72% and 26% of children respectively remained on their initial regimen. By five years on ART, the most common reasons for discontinuations were toxicity (32%, treatment failure (18%, treatment simplification (5%, drug interactions (3%, and other or unspecified reasons (18%. The incidences of treatment limiting toxicity were 50.6 (95% CI 46.2-55.4, 1.6 (0.5-4.8, 2.0 (1.2-3.3, and 1.3 (0.6-2.8 per 1000 patient years for stavudine, abacavir, efavirenz and lopinavir/ritonavir respectively.While stavudine was associated with a high risk of treatment-limiting toxicity, abacavir, lopinavir/ritonavir and efavirenz were well-tolerated. This supports the World Health Organization recommendation to replace stavudine with

  8. Evolutionary history of LINE-1 in the major clades of placental mammals.

    Directory of Open Access Journals (Sweden)

    Paul D Waters

    2007-01-01

    Full Text Available LINE-1 constitutes an important component of mammalian genomes. It has a dynamic evolutionary history characterized by the rise, fall and replacement of subfamilies. Most data concerning LINE-1 biology and evolution are derived from the human and mouse genomes and are often assumed to hold for all placentals.To examine LINE-1 relationships, sequences from the 3' region of the reverse transcriptase from 21 species (representing 13 orders across Afrotheria, Xenarthra, Supraprimates and Laurasiatheria were obtained from whole genome sequence assemblies, or by PCR with degenerate primers. These sequences were aligned and analysed.Our analysis reflects accepted placental relationships suggesting mostly lineage-specific LINE-1 families. The data provide clear support for several clades including Glires, Supraprimates, Laurasiatheria, Boreoeutheria, Xenarthra and Afrotheria. Within the afrotherian LINE-1 (AfroLINE clade, our tree supports Paenungulata, Afroinsectivora and Afroinsectiphillia. Xenarthran LINE-1 (XenaLINE falls sister to AfroLINE, providing some support for the Atlantogenata (Xenarthra+Afrotheria hypothesis.LINEs and SINEs make up approximately half of all placental genomes, so understanding their dynamics is an essential aspect of comparative genomics. Importantly, a tree of LINE-1 offers a different view of the root, as long edges (branches such as that to marsupials are shortened and/or broken up. Additionally, a robust phylogeny of diverse LINE-1 is essential in testing that site-specific LINE-1 insertions, often regarded as homoplasy-free phylogenetic markers, are indeed unique and not convergent.

  9. 49 CFR 541.6 - Requirements for replacement parts.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Requirements for replacement parts. 541.6 Section....6 Requirements for replacement parts. (a) Each replacement part for a part specified in § 541.5(a) must have the registered trademark of the manufacturer of the replacement part, or some other unique...

  10. 30 CFR 57.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 57.19028 Section 57.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Hoisting Wire Ropes § 57.19028 End attachment replacement. Wire rope attachments shall be replaced when...

  11. 30 CFR 56.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 56.19028 Section 56.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Wire Ropes § 56.19028 End attachment replacement. Wire rope attachments shall be replaced when cracked...

  12. 30 CFR 77.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 77.1438 Section 77.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... Personnel Hoisting Wire Ropes § 77.1438 End attachment replacement. Wire rope attachments shall be replaced...

  13. The Local Helium Compound Transfer Lines for the Large Hadron Collider Cryogenic System

    CERN Document Server

    Parente, C; Munday, A; Wiggins, P

    2006-01-01

    The cryogenic system for the Large Hadron Collider (LHC) under construction at CERN will include twelve new local helium transfer lines distributed among five LHC points in underground caverns. These lines, being manufactured and installed by industry, will connect the cold boxes of the 4.5-K refrigerators and the 1.8-K refrigeration units to the cryogenic interconnection boxes. The lines have a maximum of 30-m length and may possess either small or large re-distribution units to allow connection to the interface ports. Due to space restrictions the lines may have complex routings and require several elbowed sections. The lines consist of a vacuum jacket, a thermal shield and either three or four helium process pipes. Specific internal and external supporting and compensation systems were designed for each line to allow for thermal contraction of the process pipes (or vacuum jacket, in case of a break in the insulation vacuum) and to minimise the forces applied to the interface equipment. Whenever possible, f...

  14. Calculation of the Magnetic Fields of the Electric Power Line

    Directory of Open Access Journals (Sweden)

    Patsiuk V.

    2016-12-01

    Full Text Available The task of calculation of per unit length parameters of multi-conductor electrical overhead transmission lines has been treated in the paper. The calculation of distribution of electric and magnetic fields has been performed by means of the finite volume method for entire span of the line. The theoretical justification of the method for calculation the parameters of electromagnetic field taking into account the change of the vector of magnetic potential along the line has been given. The problems of electrostatic and magnetostatic for a single electric conductor and unlimited long conductor with current have been solved. For the inner and total inductivities of a single conductor under the current have been obtained relationships and drawn dependences. Dependence between the speeds of light and of electromagnetic wave’s propagation has been presented. Based on the characteristics of distribution of electric and magnetic fields of multi-conductor lines has been provided the method of calculation of the matrix of own and mutual capacitances and inductivities the calculated values of per unit length parameters of compact 110 kV electric line which is in concordance with one of basic physical constant – the speed of light.

  15. Dresden Nuclear Power Station, Units 1, 2, and 3. Semiannual report on operating and maintenance, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 388,882 MWH(e) and was on line 3111.2 hours, Unit 2 generated 1,204,106 MWH(e) and was on line 2013.4 hours, and Unit 3 generated 2,250,810 MWH(e) and was on line 3836 hours. Information is presented concerning operations, shutdowns, maintenance, changes, tests, and experiments for the three units. (U.S.)

  16. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January thru December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 953,015.5 MWH with the generator on line 7,399.37 hrs. Unit 2 generated 4,371,553.689 MWH with the generator on line 6,664.58 hrs while Unit 3 generated 4,034,251 MWH with the generator on line 7,234.86 hrs. Information is presented concerning operations, maintenance, and shutdowns

  17. East Carnduff Unit: corrosion problems

    Energy Technology Data Exchange (ETDEWEB)

    Banks, C D

    1966-07-01

    Waterflooding of the East Carnduff Unit began in late 1962. The first injection line leak was discovered April 29, 1965. The first 6 leaks in the East Carnduff Unit occurred within a period of less than one month--a very startling and serious warning of pending problems. Analysis of the pipe removed showed a deep pit covered by a severe scale in the piping fitting. Several remedial actions were tried in order to develop the present inhibition program. First, the lines were cleaned as well as possible utilizing rubber pig spheres with normal injection pressure. This proved very effective and 2 passes wiped out most of the scale in the lines. Only one line required acid. After the lines had been cleaned, a water treating rate of an organic amine corrosion inhibitor, 10 ppm of the scale inhibitor, and bactericide at the rate of 40 ppm slugs 2 days per month was initiated. The above treating program is in use at the present time and is maintaining a very low leak frequency. This experience has demonstrated 2 important points in waterflood operations: (1) a bare piping system in warm brine service requires constant attention to insure that it is being kept clean; and (2) reliance cannot be placed on any one method of checking corrosion rates.

  18. Opportunistic replacement of fusion power system parts

    International Nuclear Information System (INIS)

    Day, J.A.; George, L.L.

    1981-01-01

    This paper describes a maintenance problem in a fusion power plant. The problem is to specify which life limited parts should be replaced when there is an opportunity. The objective is to minimize the cost rate of replacement parts and of maintenance actions while satisfying a power plant availability constraint. The maintenance policy is to look ahead and replace all parts that will reach their life limits within a time called a screen. Longer screens yield greater system availabilities because more parts are replaced prior to their life limits

  19. Risks of hip and knee replacement

    Science.gov (United States)

    ... is normal to lose blood during and after hip or knee replacement surgery. Some people need a ... clot form are higher during and soon after hip or knee replacement surgery. Sitting or lying down ...

  20. Skilled nursing facilities after joint replacement

    Science.gov (United States)

    ... care providers in the weeks before your joint replacement. They can advise you about whether going directly ... of many people who have had a joint replacement? Can they tell you how many? A good ...

  1. Let the War on the Poverty Line Commence. Working Paper Series.

    Science.gov (United States)

    Bernstein, Jared

    Both social scientists and politicians agree that the way poverty is measured in the United States is inadequate. Noting that this metric influences our understanding of the extent of economic deprivation and influences the provision of social supports, this report presents various options to the current measurement and suggests a replacement for…

  2. Unique method of tooth replacement in durophagous placodont marine reptiles, with new data on the dentition of Chinese taxa.

    Science.gov (United States)

    Neenan, James M; Li, Chun; Rieppel, Olivier; Bernardini, Federico; Tuniz, Claudio; Muscio, Giuseppe; Scheyer, Torsten M

    2014-05-01

    The placodonts of the Triassic period (~252-201 mya) represent one of the earliest and most extreme specialisations to a durophagous diet of any known reptile group. Exceptionally enlarged crushing tooth plates on the maxilla, dentary and palatine cooperated to form functional crushing areas in the buccal cavity. However, the extreme size of these teeth, combined with the unusual way they occluded, constrained how replacement occurred. Using an extensive micro-computed tomographic dataset of 11 specimens that span all geographic regions and placodont morphotypes, tooth replacement patterns were investigated. In addition, the previously undescribed dental morphologies and formulae of Chinese taxa are described for the first time and incorporated into the analysis. Placodonts have a unique tooth replacement pattern and results follow a phylogenetic trend. The plesiomorphic Placodus species show many replacement teeth at various stages of growth, with little or no discernible pattern. On the other hand, the more derived cyamodontoids tend to have fewer replacement teeth growing at any one time, replacing teeth unilaterally and/or in functional units, thus maintaining at least one functional crushing area at all times. The highly derived placochelyids have fewer teeth and, as a result, only have one or two replacement teeth in the upper jaw. This supports previous suggestions that these taxa had an alternative diet to other placodonts. Importantly, all specimens show at least one replacement tooth growing at the most posterior palatine tooth plates, indicating increased wear at this point and thus the most efficient functional crushing area. © 2014 Anatomical Society.

  3. Transcatheter aortic valve replacement: historical perspectives, current evidence, and future directions.

    Science.gov (United States)

    Horne, Aaron; Reineck, Elizabeth A; Hasan, Rani K; Resar, Jon R; Chacko, Matthews

    2014-10-01

    Severe aortic stenosis (AS) results in considerable morbidity and mortality without aortic valve replacement and is expected to increase in prevalence with the aging population. Because AS primarily affects the elderly, many patients with comorbidities are poor candidates for surgical aortic valve replacement (SAVR) and may not be referred. Transcatheter aortic valve replacement (TAVR) has emerged as transformative technology for the management of AS over the past decade. Randomized trials have established the safety and efficacy of TAVR with improved mortality and quality of life compared with medical therapy in inoperable patients, while demonstrating noninferiority and even superiority to SAVR among high-risk operative candidates. However, early studies demonstrated an early penalty of stroke and vascular complications with TAVR as well as increased paravalvular leak as compared with SAVR. Two device platforms have been evaluated and approved for use in the United States: the Edwards SAPIEN and the Medtronic CoreValve. Early studies also suggest cost-effectiveness for TAVR. Ongoing studies are evaluating new iterations of the aforementioned TAVR devices, novel device designs, and applications of TAVR in expanded populations of patients including those with lower risk profiles as well as those with comorbidities that were excluded from early clinical trials. Future improvements in TAVR technology will likely reduce periprocedural and long-term complications. Further studies are needed to confirm device durability over long-term follow-up and explore the applicability of TAVR to broader AS patient populations. Copyright © 2014 Mosby, Inc. All rights reserved.

  4. Subgroup analysis of continuous renal replacement therapy in severely burned patients.

    Directory of Open Access Journals (Sweden)

    Jaechul Yoon

    Full Text Available Continuous renal replacement therapy (CRRT is administered to critically ill patients with renal injuries as renal replacement or renal support. We aimed to identify predictors of mortality among burn patients receiving CRRT, and to investigate clinical differences according to acute kidney injury (AKI status. This retrospective observational study evaluated 216 Korean burn patients who received CRRT at a burn intensive care unit. Patients were categorized by AKI status. Data were collected regarding arterial pH, laboratory results, ratio of arterial oxygen partial pressure to fractional inspired oxygen (PF ratio, and urine production. Among surviving patients, CRRT duration and the sequential organ failure assessment score were 6.5 days and 4.7 in the non-AKI group and 23.4 days and 7.4 in the AKI group, respectively (p = 0.003 and p = 0.008. On logistic regression analyses, mortality was significantly associated with a pH of 5.0 mEg/L (p = 0.045, creatinine levels of >2.0 mg/dL (p = 0.011, lactate levels of >2 mmol/L (p2 mmol/L, and a platelet count of 2 mg/dL. In the non-AKI group, poor outcomes were associated with lactate levels of >1.5 mmol/L, a PF ratio of 1.2 mg/dL. Duration of the CRRT application and the requirement for either renal replacement or renal support at the initiation of CRRT application are important considerations depending on its application.

  5. The use of transcatheter aortic valve replacement vs surgical aortic valve replacement for the treatment of aortic stenosis

    Directory of Open Access Journals (Sweden)

    Jensen HA

    2015-08-01

    Full Text Available Hanna A Jensen, Lillian L Tsai, Vinod H Thourani Division of Cardiothoracic Surgery, Joseph B Whitehead Department of Surgery, Structural Heart and Valve Center, Emory University School of Medicine, Atlanta, GA, USA Abstract: Severe aortic stenosis (AS is associated with considerable morbidity and mortality and is increasing in prevalence as the global population increases. Since AS primarily affects the elderly, many of these patients have comorbidities that make them poor candidates for the gold standard treatment for AS, surgical aortic valve replacement. Transcatheter aortic valve replacement has emerged as a novel technology for the management of AS in higher risk patients over the past decade. Randomized trials have established the safety and efficacy of transcatheter aortic valve replacement, and the medical community has rallied to identify the patients who are most suitable for this transformative treatment. This review focuses on outlining the key procedural differences, describing the unique challenges of both operations, and finally assessing and comparing outcomes both on a general level and in challenging patient subgroups. Keywords: aortic valve replacement, transcatheter aortic valve replacement, surgical aortic valve replacement 

  6. Installation of new Generation General Purpose Computer (GPC) compact unit

    Science.gov (United States)

    1991-01-01

    In the Kennedy Space Center's (KSC's) Orbiter Processing Facility (OPF) high bay 2, Spacecraft Electronics technician Ed Carter (right), wearing clean suit, prepares for (26864) and installs (26865) the new Generation General Purpose Computer (GPC) compact IBM unit in Atlantis', Orbiter Vehicle (OV) 104's, middeck avionics bay as Orbiter Systems Quality Control technician Doug Snider looks on. Both men work for NASA contractor Lockheed Space Operations Company. All three orbiters are being outfitted with the compact IBM unit, which replaces a two-unit earlier generation computer.

  7. Long-life slab replacement concrete : [summary].

    Science.gov (United States)

    2015-04-01

    Concrete slab replacement projects in Florida have demonstrated a high incidence of : replacement slab cracking. Causes of cracking have not been reliably determined. University of South Florida researchers : sought to identify the factors or : param...

  8. The nuclear safety case for the replacement research reactor

    International Nuclear Information System (INIS)

    Willers, A.; Garea, V.

    2003-01-01

    This paper presents a broad overview of the safety case being used in the licensing of Australia's Replacement Research Reactor. The reactor is a 20 MW pool-type research reactor and is being constructed at the Lucas Heights Science and Technology Centre in Sydney's south. It will be owned and operated by the Australian Nuclear Science and Technology Organisation (ANSTO) and will take over the duties currently performed by HIFAR, a DIDO-type reactor currently operating at the site. The safety case for the RRR considers all aspects of normal operation and anticipated occurrences and will be subject to periodic review and updated in line with evolving methodologies and modifications to plant and procedures. Its scope and degree of detail ensure that the risk posed to members of the public, operators and environment are all adequately low and well in the regulatory limits

  9. Variations in Humanized and Defined Culture Conditions Supporting Derivation of New Human Embryonic Stem Cell Lines

    DEFF Research Database (Denmark)

    Fletcher, Judy M; Ferrier, Patricia M; Gardner, John O

    2006-01-01

    matrix substrate of purified human laminin (Ln) with transitional reliance on mitotically inactivated human fibroblast (HDF) feeder cells. With this integrated system hESC lines were isolated using either HDF conditioned medium supplemented with a bovine-sourced serum replacement (bSRM), or a defined...

  10. Material Science in Cervical Total Disc Replacement

    Directory of Open Access Journals (Sweden)

    Martin H. Pham

    2015-01-01

    Full Text Available Current cervical total disc replacement (TDR designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti, and cobalt-chrome (CoCr. These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation.

  11. Management of hypercalcaemic crisis in adults: Current role of renal replacement therapy.

    Science.gov (United States)

    Bentata, Yassamine; El Maghraoui, H; Benabdelhak, M; Haddiya, I

    2018-06-01

    Neoplasms and hematologic diseases are the predominant etiologies of hypercalcemic crisis in adults and the immediate treatment is mainly medical and symptomatic. The use of renal replacement therapy (RRT) is often necessary to correct the hypercalcemia, uremia and electrolyte disturbances related to Acute Kidney Injury (AKI). The aim of this work was to determine the etiologies and the place of RRT in treating patients with hypercalcaemic crisis. We conducted a retrospective study for 36months at the Nephrology Unit, University Hospital, Oujda, eastern of Morocco. We included all adult patients diagnosed with hypercalcemic crisis that was defined as corrected total serum calcium of >3.5mmol/l. 12 patients were collected. All patients were female and 5 patients were elderly (≥65years). Three patients had a serum calcium value of >4mmol/l and the highest calcium value was 5.8mmol/l. Electrocardiographic abnormalities were observed in 8 cases. AKI was observed in 8 cases. Three patients had chronic kidney disease on hemodialysis. Neoplasm was noted in 9 cases. All patients received venous rehydration, glucocorticoids and biphosphonates. The use of RRT with low calcium dialysate was performed in 11 cases. Three patients died during the first 24h of hospitalization. RRT must play its full role as first line treatment of hypercalcemia crisis. Improvements in hemodialysis techniques and the use of low calcium or calcium-free dialysates currently allows this therapeutic measure to be prescribed safely, and the benefit-risk balance is positive for the great benefit provided by dialysis. Copyright © 2018 Elsevier Inc. All rights reserved.

  12. Availability and cost functions for periodically inspected preventively maintained units

    International Nuclear Information System (INIS)

    Vaurio, J.K.

    1999-01-01

    Unavailability and cost rate functions are developed for components whose failures can occur randomly but they are detected only by periodic testing or inspections. If a failure occurs between consecutive inspections, the unit remains failed until the next inspection. Components are renewed by preventive maintenance periodically, or by repair or replacement after a failure, whichever occurs first (age-replacement). The model takes into account finite repair and maintenance durations as well as costs due to testing, repair, maintenance and lost production or accidents. For normally operating units the time-related penalty is loss of production. For standby safety equipment it is the expected cost of an accident that can happen when the component is down due to a dormant failure, repair or maintenance. The objective of maintenance optimization is to minimize the total cost rate by proper selection of two intervals, one for inspections and one for replacements. General conditions and techniques are developed for solving optimal test and maintenance intervals, with and without constraints on the production loss or accident rate. Insights are gained into how the optimal intervals depend on various cost parameters and reliability characteristics

  13. Hip or knee replacement - in the hospital after

    Science.gov (United States)

    Hip replacement surgery - after - self-care; Knee replacement surgery - after - self-care ... taking walks in the hallways with help. After knee replacement, some surgeons recommend using a continuous passive ...

  14. Dynamic analysis and vibration testing of CFRP drive-line system used in heavy-duty machine tool

    Science.gov (United States)

    Yang, Mo; Gui, Lin; Hu, Yefa; Ding, Guoping; Song, Chunsheng

    2018-03-01

    Low critical rotary speed and large vibration in the metal drive-line system of heavy-duty machine tool affect the machining precision seriously. Replacing metal drive-line with the CFRP drive-line can effectively solve this problem. Based on the composite laminated theory and the transfer matrix method (TMM), this paper puts forward a modified TMM to analyze dynamic characteristics of CFRP drive-line system. With this modified TMM, the CFRP drive-line of a heavy vertical miller is analyzed. And the finite element modal analysis model of the shafting is established. The results of the modified TMM and finite element analysis (FEA) show that the modified TMM can effectively predict the critical rotary speed of CFRP drive-line. And the critical rotary speed of CFRP drive-line is 20% higher than that of the original metal drive-line. Then, the vibration of the CFRP and the metal drive-line were tested. The test results show that application of the CFRP drive shaft in the drive-line can effectively reduce the vibration of the heavy-duty machine tool.

  15. Temelin NPP - IandC replacement

    International Nuclear Information System (INIS)

    Spalenka, I.

    1997-01-01

    The original instrumentation and control system of the Temelin nuclear power plant is being upgraded and replaced by a modern Westinghouse-supplied system which meets the requirements imposed on current nuclear power plant designs. The history and purpose of the IandC system replacement is given, and the design of the new system is described in some detail. (A.K.)

  16. Replacement research reactor for Australia

    International Nuclear Information System (INIS)

    Miller, Ross

    1998-01-01

    In 1992, the Australian Government commissioned a review into the need for a replacement research reactor. That review concluded that in about years, if certain conditions were met, the Government could make a decision in favour of a replacement reactor. A major milestone was achieved when, on 3 September 1997, the Australian Government announced the construction of a replacement research reactor at the site of Australia's existing research reactor HIFAR, subject to the satisfactory outcome of an environmental assessment process. The reactor will be have the dual purpose of providing a first class facility for neutron beam research as well as providing irradiation facilities for both medical isotope production and commercial irradiations. The project is scheduled for completion before the end of 2005. (author)

  17. Clinical and Radiographic Assessment of Reasons for Replacement of Metal- Ceramic Fixed Dental Prostheses in Patients Referring to Dental School.

    Science.gov (United States)

    Al Refai, Roa'a; Saker, Samah

    2018-01-01

    The expected length of service and reasons for fixed dental prostheses (FDPs) replacement are a frequent inquiry by patients while the answers were mainly based on studies reports that was conducted outside the middle east region. This clinical and radiographic survey was constructed to assess and survey clinically and radiographically the reasons of replacement of metal-ceramic fixed dental prostheses, amongst patients reporting at dental school in Taibah University. Between January and May 2016, 151 patients were recruited for this study. Interview (include questions pertained to the length of service of the prosthesis, the nature of complaint as told by patient in her own words), clinical examination, intra-oral photographs, and periapical radiographs, were done by the researchers. The parameters assessed were secondary caries, open margins, loss of retention, failure of endodontic treatment of the abutment and periodontal diseases. A total number of 249 failed fixed dental prostheses were evaluated. Of which 180 (39.7%) were single crowns, 159 (35.0%) were retainers and 117 (25.8%) were pontics in 69 fixed partial denture. The most common reason for replacement of fixed restorations was periodontal diseases affecting 92.8% of all types' restorations, followed by defective margin in 90.4% of examined restoration, poor aesthetic in 88% of restorations, while periapical involvement was found in 85.5% of fixed dental prosthesis. The survival rates of fixed prostheses were not predictable, and no association was found between number of years in service and the number of restorations. The most common reasons for replacing single unit fixed dental prostheses are periodontal diseases and periapical involvement, while defective margins and poor aesthetic mainly associated with multi-unit fixed dental prostheses. Key words: Failure, Fixed dental prosthesis, Survival, Replacement.

  18. Hormone Replacement Therapy and Your Heart

    Science.gov (United States)

    Hormone replacement therapy and your heart Are you taking — or considering — hormone therapy to treat bothersome menopausal symptoms? Understand ... you. By Mayo Clinic Staff Long-term hormone replacement therapy used to be routinely prescribed for postmenopausal ...

  19. Replacement Saltwell Pumping System Document Bibliography

    International Nuclear Information System (INIS)

    BELLOMY, J.R.

    2000-01-01

    This document bibliography is prepared to identify engineering documentation developed during the design of the Replacement Saltwell Pumping System. The bibliography includes all engineering supporting documents and correspondence prepared prior to the deployment of the system in the field. All documents referenced are available electronically through the Records Management Information System (RMIS). Major components of the Replacement Saltwell Pumping System include the Sundyne Canned Motor Pump, the Water Filter Skid, the Injection Water Skid and the Backflow Preventer Assembly. Drawing H-14-104498 provides an index of drawings (fabrication details, PandIDs, etc.) prepared to support development of the Replacement Saltwell Pumping System. Specific information pertaining to new equipment can be found in Certified Vendor Information (CVI) File 50124. This CVI file has been established specifically for new equipment associated with the Replacement Saltwell Pumping System

  20. A 0.8–8 GHz Multi-Section Coupled Line Balun

    Directory of Open Access Journals (Sweden)

    Srikanth Itapu

    2015-04-01

    Full Text Available In this work, we propose a wideband multi-section transforming coupled-line balun using near equal length transmission line elements. The resulting design is realized by cascading several coupled-lines with minimal discontinuities. The multi-section Chebyshev matching optimizes bandwidth at the expense of passband ripple. The proposed design delivers good impedance matching and consistent 180° phase shift over 0.8–8 GHz frequency spectrum. Furthermore, the need for vias in conventional balun designs is relaxed by replacing the short-circuited (SC terminal by its equivalent dual open-circuited (OC element. The proposed design is simulated, fabricated, and measured. Both simulated and measured results are in a good agreement, and show an input port matching of below −9.7 dB over the design bandwidth, with a maximum phase and amplitude imbalance of 2.1° and 0.9 dB, respectively.

  1. Optimum body size of Holstein replacement heifers.

    Science.gov (United States)

    Hoffman, P C

    1997-03-01

    Criteria that define optimum body size of replacement heifers are required by commercial dairy producers to evaluate replacement heifer management programs. Historically recommended body size criteria have been based on live BW measurements. Numerous research studies have observed a positive relationship between BW at first calving and first lactation milk yield, which has served as the impetus for using live BW to define body size of replacement heifers. Live BW is, however, not the only available measurement to define body size. Skeletal measurements such as wither height, length, and pelvic area have been demonstrated to be related to first lactation performance and (or) dystocia. Live BW measurements also do not define differences in body composition. Differences in body composition of replacement heifers at first calving are also related to key performance variables. An updated research data base is available for the modern Holstein genotype to incorporate measures of skeletal growth and body composition with BW when defining body size. These research projects also lend insight into the relative importance of measurements that define body size of replacement heifers. Incorporation of these measurements from current research into present BW recommendations should aid commercial dairy producers to better define replacement heifer growth and management practices. This article proposes enhancements in defining optimum body size and growth characteristics of Holstein replacement heifers.

  2. Novel hydroxyamides and amides containing D-glucopyranose or D-fructose units: Biological assays in MCF-7 and MDST8 cell lines.

    Science.gov (United States)

    Carreiro, Elisabete P; Costa, Ana R; Cordeiro, Maria M; Martins, Rute; Pires, Tiago O; Saraiva, Mafalda; Antunes, Célia M; Burke, Anthony J

    2016-02-01

    A novel library of 15 compounds, hydroxyamides and amides containing a β-D-glucopyranose (D-Gluc) or a β-D-fructose (D-Fruc) units was designed and synthesized for antiproliferative assays in breast (MCF-7) and colon (MDST8) cancer cell lines. Twelve of them were hydroxyamides and were successfully synthesized from β-D-glucuronic acid (D-GluA). Six of these hydroxyamides which were acetylated hydroxy-β-D-glucopyranuronamide 2a-2f (1st Family) and the other six were their respective isomers, that is, hydroxy-β-D-fructuronamide 3a-3f (2nd Family), obtained by acid-base catalyzed isomerization. These compounds have the general structure, D-Gluc-C=ONH-CHR-(CH2)n-OH and D-Fruc-C=ONH-CHR-(CH2)n-OH, where R=an aromatic, alkyl or a hydrogen substituent, with n=0 or 1. Eight of these contained a chiral aminoalcohol group. Three compounds were amides containing a D-glucopyranose unit (3rd Family). SAR studies were conducted with these compounds. Antiproliferative studies showed that compound 4a, the bromo-amide containing the β-D-glucopyranose ring, potently inhibits the proliferation of the MDST8 cells. Five compounds (2e, 2f, 3d, 3e, and 3f) were shown to potently selectively inhibit the proliferation of the MCF-7 cells. Compound 4b was the only one showing inhibition in both cell lines. In general, the more active compounds were the amides and hydroxyamides containing the β-D-fructose moiety, and containing an alkyl group or hydrogen. Half-inhibitory concentrations (IC50) of between 0.01 and 10 μM, were observed. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. Reliability Analysis of an Extended Shock Model and Its Optimization Application in a Production Line

    Directory of Open Access Journals (Sweden)

    Renbin Liu

    2014-01-01

    some important reliability indices are derived, such as availability, failure frequency, mean vacation period, mean renewal cycle, mean startup period, and replacement frequency. Finally, a production line controlled by two cold-standby computers is modeled to present numerical illustration and its optimal part-time job policy at a maximum profit.

  4. Implementation of a digital feedwater control system at Dresden Nuclear Power Plant, Units 2 and 3: Final report

    International Nuclear Information System (INIS)

    Zapotocky, A.; Popovic, J.R.; Fournier, R.D.

    1988-12-01

    This report describes the Digital Feedwater Control System Implementation at the Dresden 2 or 3 Units of the BWR Nuclear Power Plant owned by the Commonwealth Edison Company. The digital system has been operational in Unit 3 since August 1986, and in Unit 2 since April 1987. The Bailey Control's Network 90 based digital control system replaced the obsolete GE/MAC 5000 analog control system in the reactor feedwater control loop as a ''like-for-like'' replacement. Operational experience from the Digital Feedwater Control installations has been good and the system demonstrated better performance than the old analog systems. 14 refs., 15 figs., 17 tabs

  5. Guidelines for safely changing to S.I. radiological units

    International Nuclear Information System (INIS)

    Canada is adopting the International System of Units (SI) in all sectors of the economy. The basic radiological units formerly in use, the curie, rad, rem, and roentgen are being replaced by the becquerel, gray, sievert, and coulomb per kilogram. During the transition period for conversion to SI units some problems may arise concerning received or administered radiation doses. These guidelines exaiine the occupational safety ramifications of of the change to SI by identifying the major safety concerns and providing guidelines for applying a model method within individual organizations for analyzing safety implicatikns during the changeover period

  6. Collective Training and Fielding Opportunities for the Objective Force Maneuver Systems at the Unit of Action Level in a Unit Manning/Unit Replacement Personnel System

    National Research Council Canada - National Science Library

    Courts, Michael

    2003-01-01

    The introduction of Objective Force formations, beginning with the first Unit of Action, will fundamentally change existing organizational structures, training requirements and operational constructs for the U.S. Army...

  7. Quad-Cities Station, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated by Unit 1 was 3,393,062 MWH with the generator on line 5,703.0 hrs. Unit 2 generated 4,304,684 MWH with the generator on line 7,145.3 hrs. Information is presented concerning modifications, maintenance, power generation, shutdowns, occupational radiation exposures, and organization

  8. Transmission line capital costs

    International Nuclear Information System (INIS)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy's Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs

  9. Knee joint replacement

    Science.gov (United States)

    ... to make everyday tasks easier. Practice using a cane, walker , crutches , or a wheelchair correctly. On the ... ask your doctor Knee joint replacement - discharge Preventing falls Preventing falls - what to ask your doctor Surgical ...

  10. Alternating current line-filter based on electrochemical capacitor utilizing template-patterned graphene.

    Science.gov (United States)

    Wu, Zhenkun; Li, Liyi; Lin, Ziyin; Song, Bo; Li, Zhuo; Moon, Kyoung-Sik; Wong, Ching-Ping; Bai, Shu-Lin

    2015-06-17

    Aluminum electrolytic capacitors (AECs) are widely used for alternating current (ac) line-filtering. However, their bulky size is becoming more and more incompatible with the rapid development of portable electronics. Here we report a scalable process to fabricate miniaturized graphene-based ac line-filters on flexible substrates at room temperature. In this work, graphene oxide (GO) is reduced by patterned metal interdigits at room temperature and used directly as the electrode material. The as-fabricated device shows a phase angle of -75.4° at 120 Hz with a specific capacitance of 316 µF/cm(2) and a RC time constant of 0.35 ms. In addition, it retains 97.2% of the initial capacitance after 10000 charge/discharge cycles. These outstanding performance characteristics of our device demonstrate its promising to replace the conventional AECs for ac line filtering.

  11. 7 CFR 1944.659 - Replacement housing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Replacement housing. 1944.659 Section 1944.659 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) HOUSING Housing Preservation Grants § 1944.659 Replacement housing...

  12. Potential nutritional and economic effects of replacing juice with fruit in the diets of children in the United States

    Science.gov (United States)

    Monsivais, Pablo; Rehm, Colin D

    2013-01-01

    Context Dietary guidance for children emphasizes fruit over fruit juices but little is known about the potential nutritional and economic impact of substituting fruit for juice. Objective To estimate the nutritional and economic effects of substituting whole fruit for juice in the diets of children in the US. Design Secondary analyses using the 2001-2004 National Health and Nutrition Examination Survey (NHANES) and a national food price database. Energy, nutrient intakes and diet cost were estimated before and after fruit juices were completely replaced with fruit in three models that emphasized fruits that were fresh, low-cost, and widely-consumed and a fourth model that partially replaced juice with fruit, capping juice at recommended levels. Setting A nationwide, representative sample of children in the US. Participants 7,023 children ages 3-18. Main Outcome Measures Difference in energy, nutrient intakes and diet cost between observed and modeled diets. Results For children who consumed juice, replacement of all juice servings with fresh, whole fruit led to a projected reduction in dietary energy of 233 kJ/day (−2.6% [95% CI −5.1, −0.1%]), an increase in fiber of 4.3 grams/day (+31.1% [95% CI 26.4, 35.9%]) and an increase in diet cost of $0.54/day (+13.3% [95% CI 8.8, 17.8%]). Conclusions Substitution of juice with fresh fruit has the potential to reduce energy intake and improve the adequacy of fiber intake in children’s diets. This would likely increase costs for schools, childcare providers and families. Cost impacts could be minimized by selecting processed fruits but fewer nutritional gains would be achieved. PMID:22566547

  13. New Firm Performance and the Replacement of Founder-CEOs

    DEFF Research Database (Denmark)

    Chen, Jing; Thompson, Peter

    2015-01-01

    We study the causes and consequences of the replacement of founder-CEOs in a sample of 4,172 Danish start-ups. We propose that founder-CEO replacement is driven in part by mismatches between business quality and founder ability. Our framework suggests that replacements are more likely among...... the worst- and best-performing firms, with low (high)-ability founders replaced by manager with higher (lower) ability. Replacement is not unambiguously associated with better subsequent performance. Firms that replaced the founder were much more likely to fail, but the surviving firms among them grew...

  14. Advanced age and incidence of atrial fibrillation in the postoperative period of aortic valve replacement

    Science.gov (United States)

    Pivatto Júnior, Fernando; Teixeira Filho, Guaracy Fernandes; Sant'anna, João Ricardo Michelin; Py, Pablo Mondim; Prates, Paulo Roberto; Nesralla, Ivo Abrahão; Kalil, Renato Abdala Karam

    2014-01-01

    Objective This study aims to describe the correlation between age and occurrence of atrial fibrillation after aortic stenosis surgery in the elderly as well as evaluate the influence of atrial fibrillation on the incidence of strokes, hospital length of stay, and hospital mortality. Methods Cross-sectional retrospective study of > 70 year-old patients who underwent isolated aortic valve replacement. Results 348 patients were included in the study (mean age 76.8±4.6 years). Overall, post-operative atrial fibrillation was 32.8% (n=114), but it was higher in patients aged 80 years and older (42.9% versus 28.8% in patients aged 70-79 years, P=0.017). There was borderline significance for linear correlation between age and atrial fibrillation (P=0.055). Intensive Care Unit and hospital lengths of stay were significantly increased in atrial fibrillation (Patrial fibrillation. Conclusion Post-operative atrial fibrillation incidence in aortic valve replacement is high and correlates with age in patients aged 70 years and older and significantly more pronounced in patients aged 80 years. There was increased length of stay at Intensive Care Unit and hospital, but there was no increase in mortality or stroke. These data are important for planning prophylaxis and early treatment for this subgroup. PMID:24896162

  15. Improved estimates of coordinate error for molecular replacement

    International Nuclear Information System (INIS)

    Oeffner, Robert D.; Bunkóczi, Gábor; McCoy, Airlie J.; Read, Randy J.

    2013-01-01

    A function for estimating the effective root-mean-square deviation in coordinates between two proteins has been developed that depends on both the sequence identity and the size of the protein and is optimized for use with molecular replacement in Phaser. A top peak translation-function Z-score of over 8 is found to be a reliable metric of when molecular replacement has succeeded. The estimate of the root-mean-square deviation (r.m.s.d.) in coordinates between the model and the target is an essential parameter for calibrating likelihood functions for molecular replacement (MR). Good estimates of the r.m.s.d. lead to good estimates of the variance term in the likelihood functions, which increases signal to noise and hence success rates in the MR search. Phaser has hitherto used an estimate of the r.m.s.d. that only depends on the sequence identity between the model and target and which was not optimized for the MR likelihood functions. Variance-refinement functionality was added to Phaser to enable determination of the effective r.m.s.d. that optimized the log-likelihood gain (LLG) for a correct MR solution. Variance refinement was subsequently performed on a database of over 21 000 MR problems that sampled a range of sequence identities, protein sizes and protein fold classes. Success was monitored using the translation-function Z-score (TFZ), where a TFZ of 8 or over for the top peak was found to be a reliable indicator that MR had succeeded for these cases with one molecule in the asymmetric unit. Good estimates of the r.m.s.d. are correlated with the sequence identity and the protein size. A new estimate of the r.m.s.d. that uses these two parameters in a function optimized to fit the mean of the refined variance is implemented in Phaser and improves MR outcomes. Perturbing the initial estimate of the r.m.s.d. from the mean of the distribution in steps of standard deviations of the distribution further increases MR success rates

  16. Standardization of beam line representations

    International Nuclear Information System (INIS)

    Carey, David C.

    1998-01-01

    Standardization of beam line representations means that a single set of data can be used in many situations to represent a beam line. This set of data should be the same no matter what the program to be run or the calculation to be made. We have concerned ourselves with three types of standardization: (1) The same set of data should be usable by different programs. (2) The inclusion of other items in the data, such as calculations to be done, units to be used, or preliminary specifications, should be in a notation similar to the lattice specification. (3) A single set of data should be used to represent a given beam line, no matter what is being modified or calculated. The specifics of what is to be modified or calculated can be edited into the data as part of the calculation. These three requirements all have aspects not previously discussed in a public forum. Implementations into TRANSPORT will be discussed

  17. Standardization of beam line representations

    International Nuclear Information System (INIS)

    Carey, David C.

    1999-01-01

    Standardization of beam line representations means that a single set of data can be used in many situations to represent a beam line. This set of data should be the same no matter what the program to be run or the calculation to be made. We have concerned ourselves with three types of standardization: (1) The same set of data should be usable by different programs. (2) The inclusion of other items in the data, such as calculations to be done, units to be used, or preliminary specifications, should be in a notation similar to the lattice specification. (3) A single set of data should be used to represent a given beam line, no matter what is being modified or calculated. The specifics of what is to be modified or calculated can be edited into the data as part of the calculation. These three requirements all have aspects not previously discussed in a public forum. Implementations into TRANSPORT will be discussed

  18. Discrete-continuous analysis of optimal equipment replacement

    OpenAIRE

    YATSENKO, Yuri; HRITONENKO, Natali

    2008-01-01

    In Operations Research, the equipment replacement process is usually modeled in discrete time. The optimal replacement strategies are found from discrete (or integer) programming problems, well known for their analytic and computational complexity. An alternative approach is represented by continuous-time vintage capital models that explicitly involve the equipment lifetime and are described by nonlinear integral equations. Then the optimal replacement is determined via the opt...

  19. Report on the meeting for examining replacing core

    International Nuclear Information System (INIS)

    1977-01-01

    At the time of examining the application for approval of reactor installation, it must be confirmed that the safety of the concerned reactor is secured with not only the initially loaded core but also the replacing core. Besides, it must be confirmed again that the various criteria concerning the safety are satisfied after the start of operation, because a part of the parameters of the replacing core is dependent on the operational history. On the above described viewpoints, the main parameters affecting the safety and the nuclear and thermal limits of replacing core were reviewed. Moreover, the contents of description concerning replacing core in the application form were examined. As the general matters concerning the safety of replacing core, the scram reactivity curves for BWRs and PWRs, the method of description in the application form concerning the fuel containing gadolinia, and the use of burnable poison in replacing core were examined. The meeting for examining replacing core was organized on September 20, 1976, at the Committee for Examining Reactor Safety, and this report was compiled as the results of 10 meetings. (Kako, I.)

  20. Indian Point Station, Units 1, 2, and 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 remained in a shutdown condition pending a decision by the Company on the installation of an ECCS as required by NRC. Net electrical power generated by Unit 2 was 2,267,654 MWH with the unit on line 3,056.45 hrs. Unit 3 generated 1,872,947 MWH and was on line 2,286.01 hrs. Information is presented concerning operations, reportable events, corrective maintenance, fuel performance, radioactivity releases, shutdowns, primary coolant chemistry, and occupational radiation exposures

  1. The benefits and risks of testosterone replacement therapy: a review

    Directory of Open Access Journals (Sweden)

    Nazem Bassil

    2009-06-01

    Full Text Available Nazem Bassil1, Saad Alkaade2, John E Morley1,31Division of Geriatric Medicine; 2Internal Medicine, Saint Louis University Health Sciences Center, St. Louis, Missouri, USA; 3GRECC, VA Medical Center, St. Louis, Missouri, USAAbstract: Increased longevity and population aging will increase the number of men with late onset hypogonadism. It is a common condition, but often underdiagnosed and undertreated. The indication of testosterone-replacement therapy (TRT treatment requires the presence of low testosterone level, and symptoms and signs of hypogonadism. Although controversy remains regarding indications for testosterone supplementation in aging men due to lack of large-scale, long-term studies assessing the benefits and risks of testosterone-replacement therapy in men, reports indicate that TRT may produce a wide range of benefits for men with hypogonadism that include improvement in libido and sexual function, bone density, muscle mass, body composition, mood, erythropoiesis, cognition, quality of life and cardiovascular disease. Perhaps the most controversial area is the issue of risk, especially possible stimulation of prostate cancer by testosterone, even though no evidence to support this risk exists. Other possible risks include worsening symptoms of benign prostatic hypertrophy, liver toxicity, hyperviscosity, erythrocytosis, worsening untreated sleep apnea or severe heart failure. Despite this controversy, testosterone supplementation in the United States has increased substantially over the past several years. The physician should discuss with the patient the potential benefits and risks of TRT. The purpose of this review is to discuss what is known and not known regarding the benefits and risks of TRT.Keywords: hypogonadism, testosterone replacement therapy, erectile dysfunction, osteoporosis, cardiovascular disease

  2. Replacement of steam generators at Dampierre 1 France

    International Nuclear Information System (INIS)

    Bacot, J.; Chorain, M.; Collot, Y.; Dorimini, G.

    1991-01-01

    1990 was the year of the first steam generator replacement operation on EdF's facilities. The site chosen was Dampierre 1 (900 MW PWR unit with 3 primary coolant loops). The project was a thorough success characterized by: (1) A work schedule which was entirely met and even improved on: 70 work days from the end of fuel unloading authorizing start of work in the reactor building up to the end of refitting in readiness for the primary circuit hydraulic tests, i.e. a gain of one week compared with the forecast work schedule, (2) A final dosimetry less than 230 man-rem for a target of 450 man-rem, (3) Safety: no serious accidents during the 300,000 hours worked. It also provided practical proof of French industry's capacity to undertake an SGR operation. (author)

  3. A delay time model for a mission-based system subject to periodic and random inspection and postponed replacement

    International Nuclear Information System (INIS)

    Yang, Li; Ma, Xiaobing; Zhai, Qingqing; Zhao, Yu

    2016-01-01

    We propose an inspection and replacement policy for a single component system that successively executes missions with random durations. The failure process of the system can be divided into two states, namely, normal and defective, following the delay time concept. Inspections are carried out periodically and immediately after the completion of each mission (random inspections). The failed state is always identified immediately, whereas the defective state can only be revealed by an inspection. If the system fails or is defective at a periodic inspection, then replacement is immediate. If, however, the system is defective at a random inspection, then replacement will be postponed if the time to the subsequent periodic inspection is shorter than a pre-determined threshold, and immediate otherwise. We derive the long run expected cost per unit time and then investigate the optimal periodic inspection interval and postponement threshold. A numerical example is presented to demonstrate the applicability of the proposed maintenance policy. - Highlights: • A delay time model of inspection is introduced for mission-based systems. • Periodic and random inspections are performed to check the state. • Replacement of the defective system at a random inspection can be postponed.

  4. Replacement of fine particle purification filter of the PHT purification system - 15083

    International Nuclear Information System (INIS)

    Lee, D.S.

    2015-01-01

    The increase of chalk river unidentified deposit (CRUD), a particulate corrosion product in PHT (primary heat transport) system with increased operating years of a nuclear power plant causes: -) the problems of increased heavy water decomposition and deuterium formation reaction due to catalytic reaction with CRUD, -) damage to PHT pump seal due to a corrosion product, -) damage to fuel channel closure seal, and increased radiation exposure of workers due to elevated dose rate in steam generator water chamber. Wolsung unit 3 and 4 have replaced fine filter media in PHT purification system in phases reducing the pore size of the filter media (5 μm → 2 μm → 1 μm → 0.45 μm) to solve this problem. The phased replacement of fine filter media by the one with a smaller pore size reduced CRUD in PHT system significantly and also radiation dose rate in steam generator water chamber. Accordingly, many problems related to the aging of a plant (including increased radiation exposure of workers during outage, damage to mechanical seal of PHT pump) have been solved. (author)

  5. Hip Resurfacing: An Alternative to Conventional Hip Replacement?

    Science.gov (United States)

    ... Is hip resurfacing a good alternative to hip replacement? Answers from Mark Spangehl, M.D. Hip resurfacing has lost favor with many surgeons ... women with poor bone quality. Unlike traditional hip replacement, hip resurfacing doesn't completely replace the "ball" ...

  6. Analytical solutions for evaluating the thermal performances of wet air cooling coils under both unit and non-unit Lewis Factors

    International Nuclear Information System (INIS)

    Xia Liang; Chan, M.Y.; Deng, S.M.; Xu, X.G.

    2010-01-01

    Analytical solutions for evaluating the thermal performances of both chilled water wet cooling coils and direct expansion (DX) wet cooling coils, respectively, under both unit and non-unit Lewis Factors are developed and reported in this paper. The analytical solution was validated by comparing its predictions with those from numerically solving the fundamental governing equations of heat and mass transfer taking place in a wet cooling coil. With the analytical solutions, the distributions of air temperature and humidity ratio along air flow direction in a wet cooling coil can be predicted, and the differences in the thermal performances of the cooling coils under both unit and non-unit Lewis Factors can be identified. The analytical solutions, on one hand, can be a low-cost replacement to numerically solving the fundamental heat and mass transfer governing equations, and on the other hand, is able to deal with evaluating thermal performance for wet air cooling coils operated under both unit and non-unit Lewis Factors.

  7. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  8. Dynamic analysis and vibration testing of CFRP drive-line system used in heavy-duty machine tool

    Directory of Open Access Journals (Sweden)

    Mo Yang

    2018-03-01

    Full Text Available Low critical rotary speed and large vibration in the metal drive-line system of heavy-duty machine tool affect the machining precision seriously. Replacing metal drive-line with the CFRP drive-line can effectively solve this problem. Based on the composite laminated theory and the transfer matrix method (TMM, this paper puts forward a modified TMM to analyze dynamic characteristics of CFRP drive-line system. With this modified TMM, the CFRP drive-line of a heavy vertical miller is analyzed. And the finite element modal analysis model of the shafting is established. The results of the modified TMM and finite element analysis (FEA show that the modified TMM can effectively predict the critical rotary speed of CFRP drive-line. And the critical rotary speed of CFRP drive-line is 20% higher than that of the original metal drive-line. Then, the vibration of the CFRP and the metal drive-line were tested. The test results show that application of the CFRP drive shaft in the drive-line can effectively reduce the vibration of the heavy-duty machine tool. Keywords: CFRP drive-line system, Dynamic behavior, Transfer matrix, Vibration measurement

  9. Acute renal failure requiring renal replacement therapy in the intensive care unit: impact on prognostic assessment for shared decision making.

    Science.gov (United States)

    Johnson, Robert F; Gustin, Jillian

    2011-07-01

    A 69-year-old female was receiving renal replacement therapy (RRT) for acute renal failure (ARF) in an intensive care unit (ICU). Consultation was requested from the palliative medicine service to facilitate a shared decision-making process regarding goals of care. Clinician responsibility in shared decision making includes the formulation and expression of a prognostic assessment providing the necessary perspective for a spokesperson to match patient values with treatment options. For this patient, ARF requiring RRT in the ICU was used as a focal point for preparing a prognostic assessment. A prognostic assessment should include the outcomes of most importance to a discussion of goals of care: mortality risk and survivor functional status, in this case including renal recovery. A systematic review of the literature was conducted to document published data regarding these outcomes for adult patients receiving RRT for ARF in the ICU. Forty-one studies met the inclusion criteria. The combined mean values for short-term mortality, long-term mortality, renal-function recovery of short-term survivors, and renal-function recovery of long-term survivors were 51.7%, 68.6%, 82.0%, and 88.4%, respectively. This case example illustrates a process for formulating and expressing a prognostic assessment for an ICU patient requiring RRT for ARF. Data from the literature review provide baseline information that requires adjustment to reflect specific patient circumstances. The nature of the acute primary process, comorbidities, and severity of illness are key modifiers. Finally, the prognostic assessment is expressed during a family meeting using recommended principles of communication.

  10. Electrocatalysts Prepared by Galvanic Replacement

    Directory of Open Access Journals (Sweden)

    Athanasios Papaderakis

    2017-03-01

    Full Text Available Galvanic replacement is the spontaneous replacement of surface layers of a metal, M, by a more noble metal, Mnoble, when the former is treated with a solution containing the latter in ionic form, according to the general replacement reaction: nM + mMnoblen+ → nMm+ + mMnoble. The reaction is driven by the difference in the equilibrium potential of the two metal/metal ion redox couples and, to avoid parasitic cathodic processes such as oxygen reduction and (in some cases hydrogen evolution too, both oxygen levels and the pH must be optimized. The resulting bimetallic material can in principle have a Mnoble-rich shell and M-rich core (denoted as Mnoble(M leading to a possible decrease in noble metal loading and the modification of its properties by the underlying metal M. This paper reviews a number of bimetallic or ternary electrocatalytic materials prepared by galvanic replacement for fuel cell, electrolysis and electrosynthesis reactions. These include oxygen reduction, methanol, formic acid and ethanol oxidation, hydrogen evolution and oxidation, oxygen evolution, borohydride oxidation, and halide reduction. Methods for depositing the precursor metal M on the support material (electrodeposition, electroless deposition, photodeposition as well as the various options for the support are also reviewed.

  11. Telerehabilitation Feasibility in Total Joint Replacement

    Directory of Open Access Journals (Sweden)

    Mark J. Nelson

    2017-11-01

    Full Text Available Despite documented benefits, many Total Joint Replacement (TJR patients find it difficult to access rehabilitation following discharge from hospital. One solution to improve access for TJR patients is telerehabilitation. This study aimed to assess the feasibility of introducing a telerehabilitation program for TJR patients.   TJR patients at QEII Jubilee Hospital were invited to complete a questionnaire regarding their access, feelings towards and preferences in using technology. Seventy-five patients were recruited. Most patients had computer access (72% and internet (69% at home. Sixty-five percent of participants were willing to participate in telerehabilitation. A significant difference was found between older and younger patients. Watching videos on an electronic device was the preferred method for a technology-based home exercise program and phone call the preferred method of communication.  Results indicate telerehabilitation in the TJR population is feasible from the perspective of access to, feelings toward, and preferences for technology. Keywords: Hip replacement, Knee replacement, Telerehabilitation, Telemedicine, Total joint replacement

  12. [Aftercare for durability and profitability of single-unit and multi-unit fixed dental prostheses].

    Science.gov (United States)

    de Baat, C; van Loveren, C; van der Maarel-Wierink, C D; Witter, D J; Creugers, N H J

    2013-01-01

    An important aim ofa treatment with single-unit and multi-unit fixed dental prostheses is a durable and profitable treatment outcome. That requires aftercare, too. First, the frequency of routine oral examinations should be assessed, using an individual risk profile. The objectives of the routine oral examinations are the prevention and, when necessary, the treatment of pathological conditions and complications. With regard to prevention, attention should be paid to information and instruction, oral biofilm and calculus, non-functional activities, hard tooth tissues, periodontal and peri-implant tissues, and saliva. Subsequently, it can be determined whether the intended durability and profitability have been achieved or can still be achieved, whether or not through indicated adjustments. Special attention should be paid to endodontically treated teeth. Restorative, repair or replacement treatments may be indicated in case ofcomplications, such as loose single- or multi-unitfixed dental prosthesis, fracture of a fixed dental prosthesis unit, lost tooth pulp vitality, tooth root fracture, and implant or implant abutment problems.

  13. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    Durney, J.L.; Klingler, W.B.

    1989-01-01

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor. 1 fig., 1 tab

  14. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    Durney, J.L.; Klingler, W.B.

    1990-01-01

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor

  15. Evaluation of the impact of banking umbilical cord blood units with high cell dose for ethnically diverse patients.

    Science.gov (United States)

    Stritesky, Gretta; Wadsworth, Kimberly; Duffy, Merry; Buck, Kelly; Dehn, Jason

    2018-02-01

    Umbilical cord blood units provide an important stem cell source for transplantation, particularly for patients of ethnic diversity who may not have suitably matched available, adult-unrelated donors. However, with the cost of cord blood unit acquisition from public banks significantly higher than that for adult-unrelated donors, attention is focused on decreasing cost yet still providing cord blood units to patients in need. Historical practices of banking units with low total nucleated cell counts, including units with approximately 90 × 10 7 total nucleated cells, indicates that most banked cord blood units have much lower total nucleated cell counts than are required for transplant. The objective of this study was to determine the impact on the ability to identify suitable cord blood units for transplantation if the minimum total nucleated cell count for banking were increased from 90 × 10 7 to 124 or 149 × 10 7 . We analyzed ethnically diverse patients (median age, 3 years) who underwent transplantation of a single cord blood unit in 2005 to 2016. A cord blood unit search was evaluated to identify units with equal or greater human leukocyte antigen matching and a greater total nucleated cell count than that of the transplanted cord blood unit (the replacement cord blood unit). If the minimum total nucleated cell count for banking increased to 124 or 149 × 10 7 , then from 75 to 80% of patients would still have at least 1 replacement cord blood unit in the current (2016) cord blood unit inventory. The best replacement cord blood units were often found among cords with the same ethnic background as the patient. The current data suggest that, if the minimum total nucleated cell count were increased for banking, then it would likely lead to an inventory of more desirable cord blood units while having minimal impact on the identification of suitable cord blood units for transplantation. © 2017 AABB.

  16. BERM BREAKWATERS WITH CONCRETE BLOCKS AS ARMOUR UNITS

    OpenAIRE

    Camara Aguilera, Altea

    2013-01-01

    The objective of this thesis is to test the hydraulic stability of berm breakwaters with concrete armour units. To achieve this, five breakwater models were tested with the same wave program. All the models were modifications of the Sirevåg berm breakwater. The modifications consisted in the replacement of the class I stone form the armour layer by two different concrete units, cubes and cubipodsThe design waves were Hs,100=7.0 m, Tz=10.6 s. HoTo=48. The wave program consisted in 7 different ...

  17. Guide to optimized replacement of equipment seals

    International Nuclear Information System (INIS)

    Gleason, J.F.

    1990-03-01

    A reevaluation of current scheduled replacement intervals of polymeric seals in plant equipment can achieve significant benefits. Information is provided which has the potential for increasing replacement intervals based on better information on how seals have performed through unique nuclear industry tests to qualify equipment, improved elastomers and increased knowledge of the failure mechanisms and related performance. The research was performed by reviewing applications of elastomeric seals in nuclear plants and practice associated with defining seal replacement intervals in the nuclear power and other industries. Performance indicators and how they predict degradation of seals were evaluated. Guidelines and a flow chart for reevaluating seal replacement intervals are provided. 29 refs., 38 figs., 8 tabs

  18. 49 CFR 71.5 - Boundary line between eastern and central zones.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Boundary line between eastern and central zones... BOUNDARIES § 71.5 Boundary line between eastern and central zones. (a) Minnesota-Michigan-Wisconsin. From the junction of the western boundary of the State of Michigan with the boundary between the United States and...

  19. Predictors of length of stay and patient satisfaction after hip and knee replacement surgery: fast-track experience in 712 patients

    DEFF Research Database (Denmark)

    Husted, Henrik; Holm, Gitte; Jacobsen, Steffen

    2008-01-01

    BACKGROUND AND PURPOSE: Very few studies have focused on patient characteristics that influence length of stay (LOS) in fast-track total hip (THR) and knee arthroplasty (TKR). The aim of this prospective study was to identify patient characteristics associated with LOS and patient satisfaction...... after total hip and knee replacement surgery. PATIENTS AND METHODS: Between September 2003 and December 2005, 712 consecutive, unselected patients (440 women) with a mean age of 69 (31-91) years were admitted for hip and knee replacement surgery at our specialized fast-track joint replacement unit....... Epidemiological, physical, and perioperative parameters were registered and correlated to LOS and patient satisfaction. RESULTS: 92% of the patients were discharged directly to their homes within 5 days, and 41% were discharged within 3 days. Age, sex, marital status, co-morbidity, preoperative use of walking...

  20. 30 CFR 57.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 57.19122 Section 57.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 57.19122 Replacement parts. Parts used to repair hoists shall have properties...

  1. 30 CFR 56.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 56.19122 Section 56.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 56.19122 Replacement parts. Parts used to repair hoists shall have properties...

  2. Partial knee replacement

    Science.gov (United States)

    ... good range of motion in your knee. The ligaments in your knee are stable. However, most people with knee arthritis have a surgery called a total knee arthroplasty (TKA). Knee replacement is most often done in people age 60 ...

  3. X-ray diffraction line profile analysis for defect study in Zr–2⋅5% Nb ...

    Indian Academy of Sciences (India)

    Unknown

    The microstructure characterization by X-ray line profile analysis is possible for determination of ... breadth method also gives the coherent domain size, dislocation density and micro-strain present in .... currently used for pressure tubes, has replaced Zircaloy-2 ..... the data on σ0, σNb, m, α, G, and b available in the litera-.

  4. ReplacementMatrix: a web server for maximum-likelihood estimation of amino acid replacement rate matrices.

    Science.gov (United States)

    Dang, Cuong Cao; Lefort, Vincent; Le, Vinh Sy; Le, Quang Si; Gascuel, Olivier

    2011-10-01

    Amino acid replacement rate matrices are an essential basis of protein studies (e.g. in phylogenetics and alignment). A number of general purpose matrices have been proposed (e.g. JTT, WAG, LG) since the seminal work of Margaret Dayhoff and co-workers. However, it has been shown that matrices specific to certain protein groups (e.g. mitochondrial) or life domains (e.g. viruses) differ significantly from general average matrices, and thus perform better when applied to the data to which they are dedicated. This Web server implements the maximum-likelihood estimation procedure that was used to estimate LG, and provides a number of tools and facilities. Users upload a set of multiple protein alignments from their domain of interest and receive the resulting matrix by email, along with statistics and comparisons with other matrices. A non-parametric bootstrap is performed optionally to assess the variability of replacement rate estimates. Maximum-likelihood trees, inferred using the estimated rate matrix, are also computed optionally for each input alignment. Finely tuned procedures and up-to-date ML software (PhyML 3.0, XRATE) are combined to perform all these heavy calculations on our clusters. http://www.atgc-montpellier.fr/ReplacementMatrix/ olivier.gascuel@lirmm.fr Supplementary data are available at http://www.atgc-montpellier.fr/ReplacementMatrix/

  5. 77 FR 59391 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-497-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assesment for the Proposed Brandywine Creek Replacement Project; Request for Comments on Environmental Issues; and Notice of Public Scoping Meeting The staff of the Federal...

  6. 30 CFR 823.14 - Soil replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Soil replacement. 823.14 Section 823.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-OPERATIONS ON PRIME FARMLAND § 823.14 Soil replacement. (a) Soil...

  7. Effects of potassium titanate fiber on the wear of automotive brake linings

    Science.gov (United States)

    Halberstadt, M. L.; Mansfield, J. A.; Rhee, S. K.

    1977-01-01

    Asbestos reinforcing fiber in an automotive friction material was replaced by an experimental ingredient having better thermal stability, and the effects on wear and friction were studied. A friction materials test machine (SAE J661a) was used to determine friction and wear, under constant energy output conditions, as a function of temperature between 121 and 343 C (250 and 650 F). When potassium titanate fiber replaced one half of the asbestos in a standard commercial lining, with a 40 percent upward adjustment of phenolic resin content, wear above 204 C (400 F) was improved by 40% and friction by 30%. Tests on a full-scale inertial dynamometer supported the findings of the sample dynamometer tests. It was demonstrated that the potassium titanate fiber contributes directly to the improvement in wear and friction.

  8. Using radio frequency and ultrasonic antennas for inspecting pin-type insulators on medium-voltage overhead distribution lines

    Directory of Open Access Journals (Sweden)

    Cícero Lefort Borges

    2013-05-01

    Full Text Available This paper summarises the activities undertaken when using antennas (ultrasound and radiofrequency for identifying insulators in pre-failure state by detecting the noise emitted by the distribution line and correlating this with these insulators (porcelain pin type dielectric breakdown. This has led to developing low-cost maintenance procedures and providing support and criteria for engineer-ing decisions regarding replacing these insulators. The technique used two detectors; a radio frequency detector was used in a first investigation of a particular distribution line, set to 40 MHz and installed on the roof of a moving vehicle. The ultrasound detector was used for inspecting (phases A, B, C each structure (pole selected. Atmospheric conditions had no influence on defining pre-failure insulators (pin type based on the noise detection technique. Pin type insulators emitting noise should be replaced since measurement was made from the ground and near the base of the post.

  9. Understanding the continuous renal replacement therapy circuit for acute renal failure support: a quality issue in the intensive care unit.

    Science.gov (United States)

    Boyle, Martin; Baldwin, Ian

    2010-01-01

    Delivery of renal replacement therapy is now a core competency of intensive care nursing. The safe and effective delivery of this form of therapy is a quality issue for intensive care, requiring an understanding of the principles underlying therapy and the functioning of machines used. Continuous hemofiltration, first described in 1977, used a system where blood flowed from arterial to venous cannulas through a small-volume, low-resistance, and high-flux filter. Monitoring of these early systems was limited, and without a machine interface, less nursing expertise was required. Current continuous renal replacement therapy machines offer user-friendly interfaces, cassette-style circuits, and comprehensive circuit diagnostics and monitoring. Although these machines conceal complexity behind a user-friendly interface, it remains important that nurses have sufficient knowledge for their use and the ability to compare and contrast circuit setups and functions for optimal and efficient treatment.

  10. Unit 16 - Output

    OpenAIRE

    Unit 16, CC in GIS; Star, Jeffrey L.

    1990-01-01

    This unit discusses issues related to GIS output, including the different types of output possible and the hardware for producing each. It describes text, graphic and digital data that can be generated by a GIS as well as line printers, dot matrix printers/plotters, pen plotters, optical scanners and cathode ray tubes (CRTs) as technologies for generating the output.

  11. Acceptance test for 900 MWe PWR unit replacement steam generators; Essai de reception des generateurs de vapeur de remplacement des tranches REP 900

    Energy Technology Data Exchange (ETDEWEB)

    Gourguechon, B.

    1993-12-31

    During the first half of 1994, the Gravelines 1 steam generators will be replaced (SG replacement procedure). The new SG`s differ from the former components notably by the alloy used for the tube bundle, in this case, the high chromium content Inconel 690. So, from this standpoint, they are to be considered as PWR 900 replacement SG first models and their thermal efficiency has consequently to be assessed. This will provide an opportunity of ensuring that the performance of the components delivered is in compliance with requirements and of making the necessary provisions if significant deviations are observed. The EFMT branch, which has been in charge of the instrumentation and acceptance of the different SG first models since the first PWR plants were commissioned, will be responsible for the acceptance tests and the ultimate validation of a performance assessment procedure applicable to the future replacement steam generators. The methods and tests proposed for SG expert appraisal are based on consideration of the importance of primary measurement quality for satisfactory SG assessment and of the new test facilities with which the 900 and 1 300 PWR plants are gradually being equipped. These facilities provide an on-site computer environment for tests compatible with the tools (PATTERN, etc.) used at EFMT and in other departments. This test is the first of this kind performed by EFMT and the test facility of a nuclear power plant. (author). 6 figs.

  12. On-line gas mixing and multi-channel distribution system

    International Nuclear Information System (INIS)

    Kalmani, S.D.; Mondal, N.K.; Satyanarayana, B.; Verma, P.; Joshi, Avinash

    2009-01-01

    In this presentation, we describe a mass-flow controller based on-line gas mixing unit with the multi-channel distribution system. We highlight different aspects such as requirement, design, calibration, control and operation of this system. This unit has the capability to mix up to four different input gases and distribute over 16 output channels. Output in individual channels is controlled accurately by using capillary-based system. At present, we are using this gas mixing unit for prototype of iron calorimeter (ICAL) detector of India-based Neutrino Observatory (INO).

  13. Valve-sparing and valve-replacing techniques for aortic root replacement in patients with Marfan syndrome: Analysis of early outcome.

    Science.gov (United States)

    Volguina, Irina V; Miller, D Craig; LeMaire, Scott A; Palmero, Laura C; Wang, Xing Li; Connolly, Heidi M; Sundt, Thoralf M; Bavaria, Joseph E; Dietz, Harry C; Milewicz, Dianna M; Coselli, Joseph S

    2009-05-01

    A prospective, international registry study was initiated to provide contemporary comparative data on short-term clinical outcomes after aortic valve-sparing and aortic valve-replacing root operations in patients with Marfan syndrome. The purpose of this initial report is to describe the study design and to compare early outcomes in the first 151 enrolled patients. We assessed 30-day outcomes in 151 patients who met strict Ghent diagnostic criteria for Marfan syndrome and underwent aortic root replacement with either valve-replacing (n = 46) or valve-sparing techniques (n = 105) at one of 18 participating centers. In the valve replacement group, a mechanical composite valve graft was used in 39 (85%) patients and a bioprosthetic valve in 7 (15%). In the valve-sparing group, David V procedures were performed in 57 (54%) patients, David I in 38 (36%), David IV in 8 (8%), Florida sleeve in 1 (1%), and Yacoub remodeling in 1 (1%). No in-hospital or 30-day deaths occurred. Despite longer crossclamp and cardiopulmonary bypass times in the valve-sparing group, there were no significant between-group differences in postoperative complications. Thirty-day valve-related complications occurred in 2 (4%) patients undergoing valve replacement and in 3 (3%) undergoing valve-sparing procedures (P = .6). The analysis of early outcomes revealed that valve-sparing techniques were the most common approach to root replacement in patients with Marfan syndrome in these centers. The complexity of valve-sparing root replacement did not translate into any demonstrable adverse early outcomes. Subsequent analysis will compare the 3-year durability of these two surgical approaches.

  14. Use of Renal Replacement Therapy May Influence Graft Outcomes following Liver Transplantation for Acute Liver Failure: A Propensity-Score Matched Population-Based Retrospective Cohort Study.

    Science.gov (United States)

    Knight, Stephen R; Oniscu, Gabriel C; Devey, Luke; Simpson, Kenneth J; Wigmore, Stephen J; Harrison, Ewen M

    2016-01-01

    Acute kidney injury is associated with a poor prognosis in acute liver failure but little is known of outcomes in patients undergoing transplantation for acute liver failure who require renal replacement therapy. A retrospective analysis of the United Kingdom Transplant Registry was performed (1 January 2001-31 December 2011) with patient and graft survival determined using Kaplan-Meier methods. Cox proportional hazards models were used together with propensity-score based full matching on renal replacement therapy use. Three-year patient and graft survival for patients receiving renal replacement therapy were 77.7% and 72.6% compared with 85.1% and 79.4% for those not requiring renal replacement therapy (Prenal replacement therapy was a predictor of both patient death (hazard ratio (HR) 1.59, 95% CI 1.01-2.50, P = 0.044) but not graft loss (HR 1.39, 95% CI 0.92-2.10, P = 0.114). In groups fully matched on baseline covariates, those not receiving renal replacement therapy with a serum creatinine greater than 175 μmol/L had a significantly worse risk of graft failure than those receiving renal replacement therapy. In patients being transplanted for acute liver failure, use of renal replacement therapy is a strong predictor of patient death and graft loss. Those not receiving renal replacement therapy with an elevated serum creatinine may be at greater risk of early graft failure than those receiving renal replacement therapy. A low threshold for instituting renal replacement therapy may therefore be beneficial.

  15. Splitting Terraced Houses Into Single Units Using Oblique Aerial Imagery

    Science.gov (United States)

    Dahlke, D.

    2017-05-01

    This paper introduces a method to subdivide complex building structures like terraced houses into single house units comparable to units available in a cadastral map. 3D line segments are detected with sub-pixel accuracy in traditional vertical true orthomosaics as well as in innovative oblique true orthomosaics and their respective surface models. Hereby high gradient strengths on roofs as well as façades are taken into account. By investigating the coplanarity and frequencies within a set of 3D line segments, individual cut lines for a building complex are found. The resulting regions ideally describe single houses and thus the object complexity is reduced for subsequent topological, semantical or geometrical considerations. For the chosen study area with 70 buidling outlines a hit rate of 80% for cut lines is achieved.

  16. 14 CFR 21.9 - Replacement and modification articles.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Replacement and modification articles. 21.9... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS General § 21.9 Replacement and modification articles. (a) If a person knows, or should know, that a replacement or modification article is reasonably likely to be...

  17. 45 CFR 201.70 - Treatment of replacement checks.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Treatment of replacement checks. 201.70 Section... STATES FOR PUBLIC ASSISTANCE PROGRAMS Review and Audits § 201.70 Treatment of replacement checks. (a... (FFP) for replacement checks under titles I, VI-A, X, XIV, XVI (AABD) except under the circumstances...

  18. 30 CFR 56.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 56.12036 Section 56.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... § 56.12036 Fuse removal or replacement. Fuses shall not be removed or replaced by hand in an energized...

  19. Flux-line-cutting losses in type-II superconductors

    International Nuclear Information System (INIS)

    Clem, J.R.

    1982-01-01

    Energy dissipation associated with flux-line cutting (intersection and cross-joining of adjacent nonparallel vortices) is considered theoretically. The flux-line-cutting contribution to the dissipation per unit volume, arising from mutual annihilation of transverse magnetic flux, is identified as J/sub parallel/xE/sub parallel/, where J/sub parallel/ and E/sub parallel/ are the components of the current density and the electric field parallel to the magnetic induction. The dynamical behavior of the magnetic structure at the flux-line-cutting threshold is shown to be governed by a special critical-state model similar to that proposed by previous authors. The resulting flux-line-cutting critical-state model, characterized in planar geometry by a parallel critical current density J/sub c/parallel or a critical angle gradient k/sub c/, is used to calculate predicted hysteretic ac flux-line-cutting losses in type-II superconductors in which the flux pinning is weak. The relation of the theory to previous experiments is discussed

  20. Low-flow CO₂ removal integrated into a renal-replacement circuit can reduce acidosis and decrease vasopressor requirements.

    Science.gov (United States)

    Forster, Christian; Schriewer, Jens; John, Stefan; Eckardt, Kai-Uwe; Willam, Carsten

    2013-07-24

    Lung-protective ventilation in patients with ARDS and multiorgan failure, including renal failure, is often paralleled with a combined respiratory and metabolic acidosis. We assessed the effectiveness of a hollow-fiber gas exchanger integrated into a conventional renal-replacement circuit on CO₂ removal, acidosis, and hemodynamics. In ten ventilated critically ill patients with ARDS and AKI undergoing renal- and respiratory-replacement therapy, effects of low-flow CO₂ removal on respiratory acidosis compensation were tested by using a hollow-fiber gas exchanger added to the renal-replacement circuit. This was an observational study on safety, CO₂-removal capacity, effects on pH, ventilator settings, and hemodynamics. CO₂ elimination in the low-flow circuit was safe and was well tolerated by all patients. After 4 hours of treatment, a mean reduction of 17.3 mm Hg (-28.1%) pCO₂ was observed, in line with an increase in pH. In hemodynamically instable patients, low-flow CO₂ elimination was paralleled by hemodynamic improvement, with an average reduction of vasopressors of 65% in five of six catecholamine-dependent patients during the first 24 hours. Because no further catheters are needed, besides those for renal replacement, the implementation of a hollow-fiber gas exchanger in a renal circuit could be an attractive therapeutic tool with only a little additional trauma for patients with mild to moderate ARDS undergoing invasive ventilation with concomitant respiratory acidosis, as long as no severe oxygenation defects indicate ECMO therapy.