WorldWideScience

Sample records for line installer telephone

  1. Helium transfer line installation details.

    CERN Multimedia

    G. Perinic

    2007-01-01

    A particularity of the 32 m long four in one helium transfer line in between the cold box in USC55 and the cavern UX5 is the fact that the transfer line passes through a hole in the crane rail support beam. In order to ensure the alignment of the suspension rail in the interconnecting tunnel with the hole in the rail support as well as the connection points at both ends required precise measurements of the given geometries as well as the installation of a temporary target for the verification of the theoretical predictions.

  2. Utilizing Facebook and Automated Telephone Calls to Increase Adoption of a Local Smoke Alarm Installation Program.

    Science.gov (United States)

    Frattaroli, Shannon; Schulman, Eric; McDonald, Eileen M; Omaki, Elise C; Shields, Wendy C; Jones, Vanya; Brewer, William

    2018-05-17

    Innovative strategies are needed to improve the prevalence of working smoke alarms in homes. To our knowledge, this is the first study to report on the effectiveness of Facebook advertising and automated telephone calls as population-level strategies to encourage an injury prevention behavior. We examine the effectiveness of Facebook advertising and automated telephone calls as strategies to enroll individuals in Baltimore City's Fire Department's free smoke alarm installation program. We directed our advertising efforts toward Facebook users eligible for the Baltimore City Fire Department's free smoke alarm installation program and all homes with a residential phone line included in Baltimore City's automated call system. The Facebook campaign targeted Baltimore City residents 18 years of age and older. In total, an estimated 300 000 Facebook users met the eligibility criteria. Facebook advertisements were delivered to users' desktop and mobile device newsfeeds. A prerecorded message was sent to all residential landlines listed in the city's automated call system. By the end of the campaign, the 3 advertisements generated 456 666 impressions reaching 130 264 Facebook users. Of the users reached, 4367 individuals (1.3%) clicked the advertisement. The automated call system included approximately 90 000 residential phone numbers. Participants attributed 25 smoke alarm installation requests to Facebook and 458 to the automated call. Facebook advertisements are a novel approach to promoting smoke alarms and appear to be effective in exposing individuals to injury prevention messages. However, converting Facebook message recipients to users of a smoke alarm installation program occurred infrequently in this study. Residents who participated in the smoke alarm installation program were more likely to cite the automated call as the impetus for their participation. Additional research is needed to understand the circumstances and strategies to effectively use the social

  3. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel.Pho...

  4. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. Th...

  5. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. We...

  6. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photo 01: Pictured with the newly installed magnet and transport system in the transfer line tunnel are (left to right) Volker Mertens, responsible for the LHC injection and transfer lines; personnel involved in tr...

  7. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system. Here we see the transport vehicle alongside the magnet supports. Visible in the background is the first magnet in place.

  8. Installation of the LHC transfer lines begins

    CERN Multimedia

    2003-01-01

    On 19 February, the very first magnet was installed in one of the two tunnels that will house the transfer lines leading to the LHC. This magnet, recycled from a previous facility, was transported and positioned using a novel system designed for conveying large objects through narrow tunnels.

  9. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photos 01, 02: Pictured with the newly installed magnet and transport system in the transfer line tunnel are LHC project leader Lyn Evans (second left, white helmet); Volker Mertens, responsible for the LHC injecti...

  10. The Probability of Detection in the Telephone Line of Device of the Unauthorized Removal of Information

    Directory of Open Access Journals (Sweden)

    I. V. Svintsov

    2011-06-01

    Full Text Available The article discusses the theory of quantitative description of the possible presence in the telephone line devices unauthorized removal of information, investigated with the help of probability theory.

  11. Rheumatology telephone advice line - experience of a Portuguese department.

    Science.gov (United States)

    Ferreira, R; Marques, A; Mendes, A; da Silva, J A

    2015-01-01

    Telephone helplines for patients are tool for information and advice. They can contribute to patient's satisfaction with care and to the effectiveness and safety of treatments. In order to achieve this, they need to be adequately adapted to the target populations, as to incorporate their abilities and expectations. a) Evaluate the adherence of patients to a telephone helpline managed by nurses in a Portuguese Rheumatology Department, b) Analyse the profile of users and their major needs, c) Analyse the management of calls by the nurses. The target population of this phone service are the patients treated at Day Care Hospital and Early Arthritis Clinic of our department. Nurses answered phone calls immediately between 8am and 4pm of working days. In the remaining hours messages were recorded on voice mail and answered as soon as possible. Details of the calls were registered in a dedicated sheet and patients were requested permission to use data to improve the service, with respect for their rights of confidentiality, anonymity and freedom of decision. In 18 months 173 calls were made by 79 patients, with a mean age of 47.9 years (sd=9.13). Considering the proportions of men and women in the target population, it was found that men called more frequently (M= 32.7% vs F= 20.4%, p=.016). The reasons for these calls can be divided into three categories: instrumental help, such as the request for results of complementary tests or rescheduling appointments (43.9% of calls); counselling on side effects or worsening of the disease/pain (31.2 %); counselling on therapy management (24.9%). Neither sex nor patient age were significantly related to these reasons for calling. Nurses resolved autonomously half (50.3%) of the calls and in 79.8% of the cases there was no need for patient referral to other health services. About a quarter of patients adhered to the telephone helpline.. Patients called to obtain support in the management of disease and therapy or to report side

  12. Modeling Auditory-Haptic Interface Cues from an Analog Multi-line Telephone

    Science.gov (United States)

    Begault, Durand R.; Anderson, Mark R.; Bittner, Rachael M.

    2012-01-01

    The Western Electric Company produced a multi-line telephone during the 1940s-1970s using a six-button interface design that provided robust tactile, haptic and auditory cues regarding the "state" of the communication system. This multi-line telephone was used as a model for a trade study comparison of two interfaces: a touchscreen interface (iPad)) versus a pressure-sensitive strain gauge button interface (Phidget USB interface controllers). The experiment and its results are detailed in the authors' AES 133rd convention paper " Multimodal Information Management: Evaluation of Auditory and Haptic Cues for NextGen Communication Dispays". This Engineering Brief describes how the interface logic, visual indications, and auditory cues of the original telephone were synthesized using MAX/MSP, including the logic for line selection, line hold, and priority line activation.

  13. Patterns of Signs That Telephone Crisis Support Workers Associate with Suicide Risk in Telephone Crisis Line Callers.

    Science.gov (United States)

    Hunt, Tara; Wilson, Coralie; Caputi, Peter; Wilson, Ian; Woodward, Alan

    2018-01-30

    Signs of suicide are commonly used in suicide intervention training to assist the identification of those at imminent risk for suicide. Signs of suicide may be particularly important to telephone crisis-line workers (TCWs), who have little background information to identify the presence of suicidality if the caller is unable or unwilling to express suicidal intent. Although signs of suicide are argued to be only meaningful as a pattern, there is a paucity of research that has examined whether TCWs use patterns of signs to decide whether a caller might be suicidal, and whether these are influenced by caller characteristics such as gender. The current study explored both possibilities. Data were collected using an online self-report survey in a Australian sample of 137 TCWs. Exploratory factor analysis uncovered three patterns of suicide signs that TCWs may use to identify if a caller might be at risk for suicide (mood, hopelessness, and anger), which were qualitatively different for male and female callers. These findings suggest that TCWs may recognise specific patterns of signs to identify suicide risk, which appear to be influenced to some extent by the callers' inferred gender. Implications for the training of telephone crisis workers and others including mental-health and medical professionals, as well as and future research in suicide prevention are discussed.

  14. A replacement LH2 recirculation line before installation in Discovery

    Science.gov (United States)

    1999-01-01

    A spare four-inch diameter LH2 recirculation line (shown in photo) will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about =-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.

  15. Predictive FEM simulation of thermal shock damage in the refractory lining of steelmaking installations

    NARCIS (Netherlands)

    Damhof, F.; Brekelmans, W.A.M.; Geers, M.G.D.

    2011-01-01

    Thermal shock damage in the refractory lining of steelmaking installations is modelled using an experimentally validated constitutive damage framework which is coupled incrementally with a thermo-elastic FE package. Both non-local elasticity-based damage induced by temperature gradients and thermal

  16. Feasibility of evaluating possible 85Kr environmental contamination from neon lamp production line to be installed

    International Nuclear Information System (INIS)

    Li Guangzuo

    1989-01-01

    Using a simplified method, the concentrations of 85 Kr leaking into the air of a workshop and its surroundings, where a neon lamp production line was to be installed, were calculated. The doses to the workers and inhabitants nearby were also estimated. Thus, the evaluation of 85 Kr enviromental contamination caused by imported equipments was made feasible

  17. Justice on the line? A comparison of telephone and face-to-face \\ud advice in social welfare legal aid

    OpenAIRE

    Burton, Marie

    2018-01-01

    This paper investigates the impact on legal advice of the major shift to telephone-only services in social welfare legal aid, which took place in April 2013. An empirical study comparing telephone and face-to-face advice reveals that face-to-face contact has considerable advantages in the advice interview. Based on interviews and observations with housing law clients, their lawyers and advisers, the findings of this qualitative study demonstrate that clients and lawyers often find it easier t...

  18. An Installation of IPS Bypass Line at the Fuel Test Loop

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Ho Young; Ahn, G. H.; Lee, M.; Kim, M. S.; Cho, S. H.; Han, J. S.; Hur, S. O. [KAERI, Daejeon (Korea, Republic of)

    2010-12-15

    The Fuel Test Loop(FTL) was installed for the national goal of self-supporting technology in the field of design and construction of nuclear power plant. The FTL with the fuel irradiation equipment is essential in developing, improving and inspecting the fuel of CANDU type or PWR type nuclear power plant. The FTL should be operated at the same conditions of commercial nuclear power plant such as temperature, pressure, flow rate, neutron flux and so on. Starting designing in December 2001, the FTL was installed from March 2007 to August 2008. Especially the In Pile Section(IPS) was installed at IR1 hole in August 2008. Until September 2009 after loading the test fuel, a series of power escalation tests (LSD, CSB1, CSB2, HSB, HOP) were conducted. And it was operated at the condition of CSB2 for the 8 cycles from October 2009 to July 2010. But it could not be normally operated in early 2010, because the high radiation released from irradiated materials due to the worn down bearing of main cooling pump. So, we removed the IPS and installed a newly designed IPS bypass line to prevent increasing high radiation. In this report we will present preliminary works, main works processes, devices of making work environments, a designing and manufacturing of IPS bypass line and a rack of IPS, installing know-hows, problems and solutions broke out during the work etc. We believe that our efforts to complete successful installing and operating of the FTL system will contribute for the efficient utilization of HANARO

  19. Feasibility Study for Installing Machine in Production Line to Avoid Particle Contamination Based on CFD Simulation

    Science.gov (United States)

    Khaokom, Adisorn; Thongsri, Jatuporn

    2017-10-01

    Ventilation system inside production line for electronic component production needs to meet the factory standard. Because it can eliminate small particles which may cause of human or machine in production as well as it can distribute the circulating air temperature uniformly. CFD is used in this research in order to study the feasibility and plan for machine layout in production line before actual installation. The simulation shows the airflow in every area inside production line. From simulation with releasing the particles from human and machine is found that this ventilation system generates airflow that makes most particles float out of the machines and no particle downs to the conveyor, it results to contamination. In addition, the simulation also shows the range of 19-26 °C air temperature that meets the factory standard. The results of this research are the parts of the data to renovate the production line to get more efficiency and proper on the production.

  20. Practices for improving the serviceability of linings installations in open systems

    Energy Technology Data Exchange (ETDEWEB)

    Spieres, G.V. [KTA - Tator Inc., Pittsburgh, PE (United States); Tombaugh, R.S. [PPL Susquehanna, LLC, PE (United States)

    2001-07-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  1. Practices for improving the serviceability of linings installations in open systems

    International Nuclear Information System (INIS)

    Spieres, G.V.; Tombaugh, R.S.

    2001-01-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  2. Telephone Service

    CERN Multimedia

    2005-01-01

    As part of the upgrade of telephone services, the CERN exchange switches will be updated on Thursday 2 June between 7.00 p.m. and midnight. Telephone services may be affected and possibly even disrupted during this operation. 

  3. Analysis quality of content digital plan of cadastre lines (underground installation

    Directory of Open Access Journals (Sweden)

    Marinković Goran

    2016-01-01

    Full Text Available This work presents the results of research quality digital geodetic plans lines and underground installations. The study included the creation of a digital geodetic plan sewerage network vectorization of analogue geodetic plans and creation of digital geodetic plan of the same details from the original data survey and maintenance survey. Based on research results the analysis of the accuracy and reliability digital geodetic plan created vectoring analogue plan or 'digitizing from the screen'. The results obtained in this work, the can be use not only in the Republic of Serbia, but also in other countries where digitalization of geodetic plans are increasingly gaining in importance.

  4. Manufacturing and Installation of the Compound Cryogenic Distribution Line for the Large Hadron Collider

    CERN Document Server

    Riddone,, G; Bouillot, A; Brodzinski, K; Dupont, M; Fathallah, M; Fournel, JL; Gitton, E; Junker, S; Moussavi, H; Parente, C; Riddone, G

    2007-01-01

    The Large Hadron Collider (LHC) [1] currently under construction at CERN will make use of superconducting magnets operating in superfluid helium below 2 K. A compound cryogenic distribution line (QRL) will feed with helium at different temperatures and pressures the local elementary cooling loops in the cryomagnet strings. Low heat inleak to all temperature levels is essential for the overall LHC cryogenic performance. Following a competitive tendering, CERN adjudicated in 2001 the contract for the series line to Air Liquide (France). This paper recalls the main features of the technical specification and shows the project status. The basic choices and achievements for the industrialization phase of the series production are also presented, as well as the installation issues and status.

  5. 47 CFR 68.213 - Installation of other than “fully protected” non-system simple customer premises wiring.

    Science.gov (United States)

    2010-10-01

    ... only to “unprotected” premises wiring used with simple installations of wiring for up to four line residential and business telephone service. More complex installations of wiring for multiple line services... requirements, for installation and maintenance of wiring on the subscriber's side of the demarcation point...

  6. Managing the risks of the backfill production line from material acquisition to installation

    International Nuclear Information System (INIS)

    Kiviranta, Leena; Kumpulainen, Sirpa; Keto, Paula; Autio, Jorma; Siivonen, Markku; Koho, Petri

    2012-01-01

    Document available in extended abstract form only. The tunnel backfill of Finnish KBS-3V type repository for spent nuclear fuel consists of foundation layer that is installed at site, pre-compacted backfill blocks that fill most of the tunnel and bentonite pellets to fill the gap between blocks and tunnel wall. In order to ensure the quality, availability, and timely delivery of backfill materials and components, and further to ensure the fulfillment of the requirements and specifications set for backfilling of deposition tunnels, the backfill production line was explored step-by-step, and risks related were defined and analyzed. The work described in this paper was initiated by Posiva Oy and is reported in Keto et al. (2012). The first part of the backfill production line is described in Figure 1 for Friedland clay that is designed to be used for the backfill blocks. It consists of excavation, processing and delivery of materials to backfill production facility. Second part of the production line consists of manufacturing of the backfill components, and the third part is the installation. A preliminary risk assessment was done in 2011 for the acquisition of Friedland clay and manufacturing and installation of foundation layer, blocks and pellets. The critical points of the production line were determined using a material flow description where risk is defined as a probability of something unwanted to happen times the severity of the consequences. Risk analysis was performed by going through the whole backfill production line step by step and analyzing all the incidents, which have occurred (or might occur) during the backfilling operations. A risk number from 1 to 25 was given to each step of the chain depending on how long delay the problem causes and how often it occurs. Low risk was the target for each step of the chain, medium risk was considered tolerable, for high risks management actions to decrease the risk number were considered and extremely high risks

  7. 30 CFR 817.180 - Utility installations.

    Science.gov (United States)

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and sewage...

  8. 24 CFR 3285.906 - Telephone and cable TV.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.906 Telephone and cable TV. It is recommended that the installation instructions explain that telephone and cable TV wiring should be installed in accordance with requirements of...

  9. Feasibility of evaluating possible sup 85 Kr environmental contamination from neon lamp production line to be installed

    Energy Technology Data Exchange (ETDEWEB)

    Guangzuo, Li [Chengdu Sanitary-Epidemiological Station, Chengdu, SC (China)

    1989-12-01

    Using a simplified method, the concentrations of {sup 85}Kr leaking into the air of a workshop and its surroundings, where a neon lamp production line was to be installed, were calculated. The doses to the workers and inhabitants nearby were also estimated. Thus, the evaluation of {sup 85}Kr enviromental contamination caused by imported equipments was made feasible.

  10. Preliminary Guidelines for Installation Product Line Land Management Suite (LMS) Product Developers

    National Research Council Canada - National Science Library

    Westervelt, James; Dilks, Kelly M; Goran, William D

    2005-01-01

    .... This document provides an introduction to the new technologies and techniques and is written for all involved with installation land management software development including managers, supervisors...

  11. Technical-parameter calculation model for underground low-power electrical lines and indoor installations used in telecommunications

    Directory of Open Access Journals (Sweden)

    Henry Bastidas Mora

    2011-09-01

    Full Text Available This article presents an analysis of electrical distribution theory for 60Hz-lines operating at low voltage, particularly underground lines and residential indoor installations. Such distribution lines’ behaviour is observed as a function of frequency to consider any advantages regarding the potential use of power transmission lines (PTL for transmitting telecommunication signals. A method for computing the secondary parameters is proposed which has been based on the primary parameters, namely inductance, capacitance, conductance and resistance. The secondary parameters so obtained were characteristic impedance, propagation constant (together with its real value and the attenuation constant. Conductor configurations, insulation materials and gauges commonly used in Colombia were verified for such low-voltage lines. A mathematical model is proposed as a theoretical tool for analysing and predicting characteristic impedance pattern and the attenuations which occur at high frequencies, thereby complementing our group’s previous work. Conclusions are drawn, together with a perspective regarding future work and applications.

  12. TIGER/Line Shapefile, 2017, nation, U.S., Topological Faces-Military Installation Relationship File

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  13. TIGER/Line Shapefile, 2015, nation, U.S., Military Installation National Shapefile

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  14. TIGER/Line Shapefile, 2016, nation, U.S., Military Installation National Shapefile

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  15. TIGER/Line Shapefile, 2017, nation, U.S., Military Installation National Shapefile

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  16. TIGER/Line Shapefile, 2016, nation, U.S., Topological Faces-Military Installation Relationship File

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  17. 24 CFR 3285.704 - Telephone and cable TV.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Telephone and cable TV. 3285.704....704 Telephone and cable TV. Refer to § 3285.906 for considerations pertinent to installation of telephone and cable TV. ...

  18. Telephone switchboard closure | 19 December

    CERN Multimedia

    2014-01-01

    Exceptionally, the telephone switchboard will close at 4 p.m. on Friday, 19 December, instead of the usual time of 6 p.m., to allow time for closing all systems properly before the annual closure. Therefore, switchboard operator assistance to transfer calls from/to external lines will stop. All other phone services will run as usual.

  19. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    TS Department

    2008-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 3 December. During this time, the fixed-line telephone and audio-conference services may be disrupted. However, the CCC and the Fire Brigade will be reachable at all times. Mobile telephone services (GSM) will not be affected by this work. For further details please contact mailto:Netops@cern.ch.

  20. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    TS Department

    2008-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 3 December. During this time, the fixed-line telephone and audio-conference services may be disrupted. However, the CCC and the Fire Brigade will be reachable at all times. Mobile telephone services (GSM) will not be affected by this work. For further details please contact Netops@cern.ch.

  1. Telephone counseling for the public after the Fukushima Daiichi Nuclear Power Plant accident

    International Nuclear Information System (INIS)

    Horiguchi, T.; Kojima, K.; Itoh, T.

    2011-01-01

    After the Fukushima Daiichi Nuclear Power Plant accident, Kinki University Atomic Energy Research Institute provided telephone counseling services in order to respond the public's growing concerns about radiation and nuclear energy. Three telephone lines were newly installed for the counseling and the number of consultation marked 705 between March 24 and April 2. In this report, by summarizing the contents of the counseling, we will show what the public concerned about shortly after the accident and report how we responded to the concerns. (author)

  2. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 20 November. Fixed-line telephone and audioconference services may be disrupted while the work is being carried out. However, the CCC and the fire brigade will be contactable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. For further details about the maintenance work, please contact the telephone switchboard on 76111 or by email to standard.telephone@cern.ch. Telecom Section IT/CS

  3. Total Telephone Tips.

    Science.gov (United States)

    Corder, Lloyd E.; And Others

    This manual of telephone behavior tips for business and sales professionals offers ways to handle the disgruntled caller and makes suggestions on topics relevant to the telephone. The manual is divided into the following sections and subsections: (1) Common Courtesy (staff tips, answering the telephone, screening calls, transferring calls, taking…

  4. Telephone Exchange Maintenance

    CERN Multimedia

    2005-01-01

    Urgent maintenance work on CERN telephone exchanges will be performed on 24 March from 6 a.m. to 8 a.m. Telephone services may be disrupted or even interrupted during this time. For more details, please contact us by email at Standard.Telephone@cern.ch.

  5. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  6. Telephoning in English

    CERN Document Server

    Naterop, B Jean

    1994-01-01

    Many people have to use English on the telephone in the course of their work, either at the level of taking a simple message or involving more complex tasks such as requesting information. Telephoning in English provides an up-to-date and relevant context in which students from lower-intermediate level upwards can develop practical telephone skills. The course principally develops spoken interactive skills, but also includes reading material on telephone systems and techniques. As the material is not restricted to particular job functions, it is suitable for students in a wide range of business and administration fields.

  7. Development and installation of a new on-line plant safety monitoring system for the Paks VVER-440 units

    International Nuclear Information System (INIS)

    Vegh, J.; Major, C.; Buerger, L.; Lipcsei, S.; Horvath, C.; Kapocs, G.; Eiler, J.; Hornaes, A.; Hulsund, J.E.

    2000-01-01

    The paper describes the architecture, modules, algorithms and human-machine interface of a new operator support system (OSS), which is integrated into the new, reconstructed Paks NPP plant computers. The main task of the new OSS is to perform continuous plant safety monitoring and assessment, it has the following basic functions: on-line evaluation and presentation of critical safety function (CSF) status trees, continuous evaluation and presentation of the actual safety status of the plant, displaying and browsing the new symptom-oriented EOPs, automatic displaying of those process signals which are quoted in the EOPs. The first version of the new operator support system was connected to the Paks NPP full scope simulator in October 1999. This configuration was later successfully applied for the simulator testing of the new symptom-oriented EOP set for the Paks NPP in November 1999. The installation process was continued in 2000: the new system started its operation on Unit 2 (June) and on Unit 1 (August), together with the reconstructed, new PCS. (author)

  8. Update of telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, the CERN switching centre will be updated on Monday 3 July between 8.00 p.m. and 3.00 a.m. Telephone services may be disrupted and possibly even interrupted during this operation.We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  9. Update of telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, the CERN switching centre will be updated on Wednesday 14 June between 8.00 p.m. and midnight. Telephone services may be disrupted and possibly even interrupted during this operation. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  10. Update of telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, the CERN switching centre will be updated on between Monday 23 October 8.00 p.m. and Tuesday 24 October 2.00 a.m. Telephone services may be disrupted and possibly even interrupted during this operation. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  11. Update of telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, the CERN switching centre will be updated on Monday 3 July between 8.00 p.m. and 3.00 a.m. Telephone services may be disrupted and possibly even interrupted during this operation. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  12. Upgrade of telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, work will be carried out on the CERN switching centre between Monday 23 October 8.00 p.m. and Tuesday 24 October 2.00 a.m. Telephone services may be disrupted and possibly even interrupted during this operation. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  13. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XVII, I--MAINTAINING THE LUBRICATION SYSTEM--CUMMINS DIESEL ENGINE, II--UNIT INSTALLATION AND REMOVAL--DRIVE LINES.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE DIESEL ENGINE LUBRICATION SYSTEM AND THE PROCEDURES FOR REMOVAL AND INSTALLATION OF THE DRIVE LINE USED IN DIESEL ENGINE POWER DISTRIBUTION. TOPICS ARE (1) PROLONGING ENGINE LIFE, (2) FUNCTIONS OF THE LUBRICATING SYSTEM, (3) TRACING THE LUBRICANT FLOW, (4) DETERMINING…

  14. The Power Behind the Controversy: Understanding Local Policy Elites' Perceptions on the Benefits and Risks Associated with High Voltage Power Line Installation in the State of Arkansas

    Science.gov (United States)

    Moyer, Rachael M.

    Following a proposal for the installation of high voltage power lines in northwest Arkansas, a controversial policy debate emerged. Proponents of the transmission line argue that such an installation is inevitable and necessary to efficiently and reliably support the identified electric load in the region. Opponents claim that the lines will degrade the natural environment and hamper the tourism-based local economy in affected regions, notably in Ozark Mountain areas. This study seeks to understand how local policy elites perceive the benefits and risks associated with proposed transmission lines, which is a critical step in comprehending the formation and changes of related government policies. First, based upon the dual process theory of judgment, this study systematically investigates the triadic relationships between (a) more profound personal value predispositions, (b) affects and feelings, and (c) perceived benefits and risks related to the proposed installation of high voltage power lines among local policy elites in the state of Arkansas. Next, this study focuses more specifically on the role of value predispositions, specific emotional dimensions of affect heuristics, and perceptions pertaining to high voltage power line risks and benefits. Using original data collected from a statewide Internet survey of 420 local leaders and key policymakers about their opinions on the related issues, other factors claimed by previous literature, including trust, knowledge level, and demographic characteristics are considered. Analytical results suggest that grid-group cultural predispositions, as deeply held core values within local policy elites' individual belief systems, both directly and indirectly -- through affective feelings -- shape perceived utility associated with the installation of high voltage power lines. Recognizing that risk perceptions factor into policy decisions, some practical considerations for better designing policy addressing controversial issues

  15. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 20 November. Fixed-line telephone and audioconference services may be disrupted while the work is being carried out. However, the CCC and the fire brigade will be reachable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. For further details about the maintenance work, please contact the telephone switchboard on 76111 or by email. Telecom Section - IT/CS

  16. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    IT/CS

    2014-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and 2 a.m. on 26 August.   Fixed-line telephone and audio-conference services may be disrupted during this intervention. Nevertheless, the CCC and the Fire Brigade will be reachable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work.

  17. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    IT Department

    2009-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8h30 and 17h30 on Saturday 9 May. Fixed-line telephone and audio-conference services may be disrupted during this intervention. Nevertheless, the CCC and the fire brigade will be reachable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. IT/CS/CS

  18. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    IT Department

    2009-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 20h00 and midnight on the 29th of July in order to apply the latest software patches. Fixed-line telephone and audio-conference services may be disrupted during this intervention. Nevertheless, the CCC and the fire brigade will be reachable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. IT/CS/CS

  19. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    IT Department

    2011-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 20h00 and 2h00 on the 16 November. Fixed-line telephone and audio-conference services may be disrupted during this intervention. Nevertheless, the CCC and the fire brigade will be reachable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. IT/CS

  20. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    IT Department

    2011-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 20h00 and midnight on the 21st of February in order to apply the latest software patches. Fixed-line telephone and audio-conference services may be disrupted during this intervention. Nevertheless, the CCC and the fire brigade will be reachable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. CS Group

  1. Does access to a colorectal cancer screening website and/or a nurse-managed telephone help line provided to patients by their family physician increase fecal occult blood test uptake?: A pragmatic cluster randomized controlled trial study protocol

    Directory of Open Access Journals (Sweden)

    Clouston Kathleen

    2012-05-01

    Full Text Available Abstract Background Fecal occult blood test screening in Canada is sub-optimal. Family physicians play a central role in screening and are limited by the time constraints of clinical practice. Patients face multiple barriers that further reduce completion rates. Tools that support family physicians in providing their patients with colorectal cancer information and that support uptake may prove useful. The primary objective of the study is to evaluate the efficacy of a patient decision aid (nurse-managed telephone support line and/or colorectal cancer screening website distributed by community-based family physicians, in improving colorectal cancer screening rates. Secondary objectives include evaluation of (disincentives to patient FOBT uptake and internet use among 50 to 74 year old males and females for health-related questions. Challenges faced by family physicians in engaging in collaborative partnerships with primary healthcare researchers will be documented. Methods/design A pragmatic, two-arm, randomized cluster controlled trial conducted in 22 community-based family practice clinics (36 clusters with 76 fee-for-service family physicians in Winnipeg, Manitoba, Canada. Each physician will enroll 30 patients attending their periodic health examination and at average risk for colorectal cancer. All physicians will follow their standard clinical practice for screening. Intervention group physicians will provide a fridge magnet to each patient that contains information facilitating access to the study-specific colorectal cancer screening decision aids (telephone help-line and website. The primary endpoint is patient fecal occult blood test completion rate after four months (intention to treat model. Multi-level analysis will include clinic, physician and patient level variables. Patient Personal Health Identification Numbers will be collected from those providing consent to facilitate analysis of repeat screening behavior. Secondary outcome

  2. Large Pelagics Telephone Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Large Pelagics Telephone Survey (LPTS) collects fishing effort information directly from captains holding Highly Migratory Species (HMS) permits (required by...

  3. ENERGY STAR Certified Telephones

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 3.0 ENERGY STAR Program Requirements for Telephony (cordless telephones and VoIP...

  4. Psychotherapeutic intervention by telephone

    Directory of Open Access Journals (Sweden)

    Erika Mozer

    2008-06-01

    Full Text Available Erika Mozer1,2, Bethany Franklin1,3, Jon Rose11Department of Veterans Affairs, Palo Alto Health Care System, Palo Alto, CA, USA; 2PGSP Stanford PsyD Consortium Palo Alto, CA, USA; 3Pacific Graduate School of Psychology Palo Alto, California, USAAbstract: Psychotherapy conducted over the telephone has received increasing amounts of empirical attention given practical advantages that side-step treatment barriers encountered in traditional office-based care. The utility and efficacy of telephone therapy appears generalizable across diverse clinical populations seeking care in community-based hospital settings. Treatment barriers common to older adults suggest that telephone therapy may be an efficient and effective mental health resource for this population. This paper describes empirical studies of telehealth interventions and case examples with psychotherapy conducted via telephone on the Spinal Cord Injury Unit of the Palo Alto Veterans’ Administration. Telephone therapy as appears to be a viable intervention with the aging population.Keywords: telehealth, rural mental health, psychotherapy, healthcare delivery, telecare

  5. The Origin and Role of Trust in Local Policy Elites' Perceptions of High-Voltage Power Line Installations in the State of Arkansas.

    Science.gov (United States)

    Tumlison, Creed; Moyer, Rachael M; Song, Geoboo

    2017-05-01

    The debate over an installation of high-voltage power lines (HVPLs) has been intense, particularly in northwest Arkansas. Detractors claim that the installation will negatively affect both the natural environment and the local economy, which contains a large tourism component. By contrast, those in favor of installing HVPLs claim that the installation is necessary in order to reliably support the increasing demand for electric power. Using original data collected from a recent statewide Internet survey of 420 local policy elites in Arkansas, this article focuses on two key aspects. First, we examine how local policy elites' perceptions of risks versus benefits of HVPL installation in their communities are influenced by their levels of trust toward information provided by various sources (e.g., energy industry, environmental groups, and government). Second, we utilize cultural theory to explain how the cultural worldviews of policy elites--specifically, egalitarianism, individualism, hierarchism, and fatalism--shape these levels of trust and HVPL benefit-risk perceptions, while controlling for other factors claimed by previous literature, including levels of knowledge on energy-related issues and demographic characteristics. In general, our analysis indicates that policy elites' value-oriented formation of HVPL benefit-risk perceptions is partially due to the influence cultural values have on trust in information sources. We conclude this article by discussing broader implications for the origin and role of trust in policy elites' decisions throughout the policy-making process. © 2016 Society for Risk Analysis.

  6. Understanding Local Policy Elites' Perceptions on the Benefits and Risks Associated with High-Voltage Power Line Installations in the State of Arkansas.

    Science.gov (United States)

    Moyer, Rachael M; Song, Geoboo

    2016-10-01

    Recently, a controversial policy debate has arisen concerning the installation of high-voltage power lines in northwest Arkansas. While proponents argue that such an installation is inevitable to efficiently and reliably support the identified electric load in the region, opponents claim that the lines will degrade the natural environment and hamper the tourism-based local economy in affected regions, notably in Ozark Mountain areas. Of particular interest is to understand how local policy elites perceive the benefits and risks associated with such divisive proposals, which is critical for comprehending the formation and changes of related government policies. Based upon the dual process theory of judgment, this study systematically investigates the triadic relationships between (a) more profound personal value predispositions, (b) affects and feelings, and (c) perceived benefits and risks related to the proposed installation of high-voltage power lines among local policy elites in the state of Arkansas. In doing so, we analyze original data collected from a statewide Internet survey of 420 local leaders and key policymakers about their opinions on the related issues, while considering other factors claimed by previous literature to influence risk perceptions, including trust, knowledge level, and demographic characteristics. Analytical results suggest that grid-group cultural predispositions, as deeply held core values within local policy elites' individual belief systems, both directly and indirectly-through affective feelings-shape perceived utility associated with the installation of high-voltage power lines. We conclude this article by suggesting some practical considerations for better designing policy addressing controversial issues of this nature. © 2016 Society for Risk Analysis.

  7. Durable Residual Wall Lining (DL) Installation Concepts and Acceptability as an IRS Replacement Tool for Malaria Vector Control

    DEFF Research Database (Denmark)

    Larsen, Marie Louise; Lenau, Torben Anker

    that will eliminate the need for repeated spraying of walls over a period of 3-4 years after installation. The objective of this project was to evaluate a variety of methods for attaching DL to various wall surfaces found in traditional, rural African housing. Assessments were made as to strength of attachment under...... various stresses and appearance after installation. The experiments took place in Anwona village near Obuasi, Ghana with the support and cooperation of AngloGold Ashanti’s Malaria Control Center. 55 mechanical and adhesive products were tested for their ability to hold a static load (simulating long...... observations were included in the DL Installation Manual, the final delivery of this project....

  8. Network of mobile telephone communication: necessarily of 3. Millennium

    International Nuclear Information System (INIS)

    Dejana, V.; Dragan, M.; Nebojsa, V.; Simo, S.

    2002-01-01

    Mobile telephones have transformed the telecommunications industry. These devices can be used to make telephone calls from almost anywhere. There are two types, one has the antenna mounted on the handset and the other has the antenna mounted on a separate transmitter or, if the telephone is installed in a vehicle, mounted on the roof or rear window. Communication between a mobile telephone and the nearest base station is achieved by the microwave emissions from the antenna. Concerns have been raised about the type of mobile telephone that has the antenna in the handset. In this case, the antenna is very close to the user's head during normal use of the telephone and there is concern about the level of microwave emissions to which the brain is being exposed. Those telephones that have the antenna mounted elsewhere are of no concern, since exposure levels decrease rapidly with increasing distance from the antenna. Cordless telephones, which need to be operated within about 20 metres of a base unit that is connected directly to the telephone system, do not have any health concerns associated with their use because exposure levels are very low

  9. TU-H-BRA-07: Design, Construction, and Installation of An Experimental Beam Line for the Development of MRI-Linac Compatible Electron Accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Whelan, B; Keall, P [University of Sydney, Sydney (Australia); Holloway, L [Liverpool Hospital and Ingham Institute, Liverpool, NSW (United Kingdom); Gierman, S; Schmerge, J; Tantawi, S; Tremaine, A; Trautwein, A; Scott, B [Stanford Linear Accelerator Facility, Palo Alto, CA (United States); Fahrig, R [Siemens Healthcare GmbH, Forchheim (Germany)

    2016-06-15

    Purpose: MRI guided radiation therapy (MRIgRT) is a rapidly growing field; however, Linac operation in MRI fringe fields represents an ongoing challenge. We have previously shown in-silico that Linacs could be redesigned to function in the in-line orientation with no magnetic shielding by adopting an RF-gun configuration. Other authors have also published insilico studies of Linac operation in magnetic fields; however to date no experimental validation data is published. This work details the design, construction, and installation of an experimental beam line to validate our in-silico results. Methods: An RF-gun comprising 1.5 accelerating cells and capable of generating electron energies up to 3.2MeV is used. The experimental apparatus was designed to monitor both beam current (toroid current monitor), spot size (two phosphor screens with viewports), and generate peak magnetic fields of at least 1000G (three variable current electromagnetic coils). Thermal FEM simulations were developed to ensure coil temperature remained within 100degC. Other design considerations included beam disposal, vacuum maintenance, radiation shielding, earthquake safety, and machine protection interlocks. Results: The beam line has been designed, built, and installed in a radiation shielded bunker. Water cooling, power supplies, thermo-couples, cameras, and radiation shielding have been successfully connected and tested. Interlock testing, vacuum processing, and RF processing have been successfully completed. The first beam on is expected within weeks. The coil heating simulations show that with care, peak fields of up to 1200G (320G at cathode) can be produced using 40A current, which is well within the fields expected for MRI-Linac systems. The maximum coil temperature at this current was 84degC after 6 minutes. Conclusion: An experimental beam line has been constructed and installed at SLAC in order to experimentally characterise RF gun performance in in-line magnetic fields, validate

  10. TU-H-BRA-07: Design, Construction, and Installation of An Experimental Beam Line for the Development of MRI-Linac Compatible Electron Accelerator

    International Nuclear Information System (INIS)

    Whelan, B; Keall, P; Holloway, L; Gierman, S; Schmerge, J; Tantawi, S; Tremaine, A; Trautwein, A; Scott, B; Fahrig, R

    2016-01-01

    Purpose: MRI guided radiation therapy (MRIgRT) is a rapidly growing field; however, Linac operation in MRI fringe fields represents an ongoing challenge. We have previously shown in-silico that Linacs could be redesigned to function in the in-line orientation with no magnetic shielding by adopting an RF-gun configuration. Other authors have also published insilico studies of Linac operation in magnetic fields; however to date no experimental validation data is published. This work details the design, construction, and installation of an experimental beam line to validate our in-silico results. Methods: An RF-gun comprising 1.5 accelerating cells and capable of generating electron energies up to 3.2MeV is used. The experimental apparatus was designed to monitor both beam current (toroid current monitor), spot size (two phosphor screens with viewports), and generate peak magnetic fields of at least 1000G (three variable current electromagnetic coils). Thermal FEM simulations were developed to ensure coil temperature remained within 100degC. Other design considerations included beam disposal, vacuum maintenance, radiation shielding, earthquake safety, and machine protection interlocks. Results: The beam line has been designed, built, and installed in a radiation shielded bunker. Water cooling, power supplies, thermo-couples, cameras, and radiation shielding have been successfully connected and tested. Interlock testing, vacuum processing, and RF processing have been successfully completed. The first beam on is expected within weeks. The coil heating simulations show that with care, peak fields of up to 1200G (320G at cathode) can be produced using 40A current, which is well within the fields expected for MRI-Linac systems. The maximum coil temperature at this current was 84degC after 6 minutes. Conclusion: An experimental beam line has been constructed and installed at SLAC in order to experimentally characterise RF gun performance in in-line magnetic fields, validate

  11. Telephone-Based Coaching.

    Science.gov (United States)

    Boccio, Mindy; Sanna, Rashel S; Adams, Sara R; Goler, Nancy C; Brown, Susan D; Neugebauer, Romain S; Ferrara, Assiamira; Wiley, Deanne M; Bellamy, David J; Schmittdiel, Julie A

    2017-03-01

    Many Americans continue to smoke, increasing their risk of disease and premature death. Both telephone-based counseling and in-person tobacco cessation classes may improve access for smokers seeking convenient support to quit. Little research has assessed whether such programs are effective in real-world clinical populations. Retrospective cohort study comparing wellness coaching participants with two groups of controls. Kaiser Permanente Northern California, a large integrated health care delivery system. Two hundred forty-one patients who participated in telephonic tobacco cessation coaching from January 1, 2011, to March 31, 2012, and two control groups: propensity-score-matched controls, and controls who participated in a tobacco cessation class during the same period. Wellness coaching participants received an average of two motivational interviewing-based coaching sessions that engaged the patient, evoked their reason to consider quitting, and helped them establish a quit plan. Self-reported quitting of tobacco and fills of tobacco cessation medications within 12 months of follow-up. Logistic regressions adjusting for age, gender, race/ethnicity, and primary language. After adjusting for confounders, tobacco quit rates were higher among coaching participants vs. matched controls (31% vs. 23%, p Coaching participants and class attendees filled tobacco-cessation prescriptions at a higher rate (47% for both) than matched controls (6%, p coaching was as effective as in-person classes and was associated with higher rates of quitting compared to no treatment. The telephonic modality may increase convenience and scalability for health care systems looking to reduce tobacco use and improve health.

  12. Telephone-Directory Program

    Science.gov (United States)

    Vlahos, William

    2005-01-01

    eDirectory is a computer program that makes it possible to view entries in the Jet Propulsion Laboratory (JPL) telephone directory by use of PalmPilot(TradeMark) (or equivalent) personal digital assistants. When one uses eDirectory, a single click causes the downloading of a current copy of the directory (which is updated nightly) from a server. The downloaded directory data can be sorted and searched. The program can append a "JPL" category and save directory information in a file that can be imported into the Palm Desktop(TradeMark) software.

  13. CONFUSION WITH TELEPHONE NUMBERS

    CERN Multimedia

    Telecom Service

    2002-01-01

    he area code is now required for all telephone calls within Switzerland. Unfortunately this is causing some confusion. CERN has received complaints that incoming calls intended for CERN mobile phones are being directed to private subscribers. This is caused by mistakenly dialing the WRONG code (e.g. 022) in front of the mobile number. In order to avoid these problems, please inform your correspondents that the correct numbers are: 079 201 XXXX from Switzerland; 0041 79 201 XXXX from other countries. Telecom Service

  14. CONFUSION WITH TELEPHONE NUMBERS

    CERN Multimedia

    Telecom Service

    2002-01-01

    The area code is now required for all telephone calls within Switzerland. Unfortunately this is causing some confusion. CERN has received complaints that incoming calls intended for CERN mobile phones are being directed to private subscribers. This is caused by mistakenly dialing the WRONG code (e.g. 022) in front of the mobile number. In order to avoid these problems, please inform your correspondents that the correct numbers are: 079 201 XXXX from Switzerland; 0041 79 201 XXXX from other countries. Telecom Service  

  15. The analysis of the external factors influence on the efficiency of the absorption heat pumps inclusion in the scheme of a two-stage line installation of a STP

    Directory of Open Access Journals (Sweden)

    Luzhkovoy Dmitriy S.

    2017-01-01

    Full Text Available The article deals with a comparative analysis of the efficiency of a two-stage line installation in a heating turbine before and after the inclusion of absorption heat pumps into its scheme with a decrease in the outside air temperature. The research shows the dependence of the efficiency of the line installation on its heat load while using AHP in its scheme, as well as on the heat conversion factor of the absorption heat pumps.

  16. Conceptual Design of On-line Based Licensing Review and Assesment System of Nuclear Installations and Nuclear Materials ('PRIBEN')

    International Nuclear Information System (INIS)

    Melani, Ai; Chang, Soon Heung

    2008-01-01

    At the present Indonesia has no nuclear power plant in operation yet, although it is expected that the first nuclear power plant will be operated and commercially available in around the year of 2016 to 2017 in Muria Peninsula. There are only three research reactors, one nuclear fuel fabrication plant for research reactors, and one experimental fuel fabrication plant for nuclear power, one isotope production facility and some other research facilities. All the facility is under Nuclear Energy Regulatory Agency (BAPETEN) controlling through regulation, licensing and inspection. The organizations operation submits licensing application to BAPETEN before utilizing the facility. According to the regulation before BAPETEN give license they perform review and assessment for the utility application. Based on the review and assessment result, BAPETEN may stipulate, reject, delay or terminate the license. In anticipation of expansion of the nuclear program in Indonesia, BAPETEN should have an integrated and updated system for review and asses the licensing application. For this reason, an expert system for the review and asses the licensing application, so-called PRIBEN (Perizinan Reaktor, Instalasi dan Bahan Nuklir/Licensing of Reactor, Nuclear Installations and Nuclear Materials), is developed which runs on the online-based reality environment

  17. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  18. Analyses in support of installation of steam-dump-to-atmosphere valves at steam lines of the Dukovany NPP

    International Nuclear Information System (INIS)

    Kral, P.

    1998-01-01

    Four conservative analyses were carried out with a view to examining the cooldown capacity of the super-emergency feedwater pump (SEFWP) → steam generator (SG) → steam dump to atmosphere/main steam line (SDA/MSL) chain. This emergency cooldown capacity was investigated for a postulated accident associated with a main steam header break + main feedwater header break + closing of all main steam lines, and for an artificial accident with SCRAM + isolation of all MSLs + loss of feedwater. The RELAP5/MOD3.1 code and a detailed 3-loop input model of the Dukovany plant were employed. Conservative assumptions with respect to the initial reactor power, decay heat evolution, and other input parameters were applied. The results gave evidence that the capacity of both the 2SEFWP → 2SG → 2SDA/SG and 1SEFWP → 1SG → 1SDA/SG chains is sufficient for the decay heat to be removed from the reactor; however, a considerably long time allowing for a sufficient drop of the decay heat is necessary for a deep cooldown of the primary circuit. For the event encompassing main steam header break + main feedwater header break with isolation of all MSLs and with cooling by 2SEFWPs, a time-consuming calculation gave evidence of the feasibility of passing to the water-water regime and primary system cooldown to below 93 deg C in the hot legs

  19. This picture was taken in 1967 during the first test of the Isotope On-Line Separator (ISOLDE) installation at the 600 MeV CERN Synchro Cyclotron.

    CERN Multimedia

    CERN PhotoLab

    1967-01-01

    When ISOLDE began operation, it was unique in the world. It used a new technique to overcome the problem of rapidly separating interesting atoms from the rest of the nuclear target. Through a combination of chemical and electromagnetic methods the different isotopes were separated and converted into an ion beam made of just one isotope. On-line production of radioactive nuclei, in this way, offered many new opportunities for physicists as it allowed them to perform previously impossible experiments on short-lived nuclei. ISOLDE has become one of CERN's major installations and it supports a broad scientific programme by providing beams to different experiments. The techniques developed at ISOLDE have opened up a new field of radioactive ion-beam accelerators, both at CERN and worldwide.

  20. Visiting the SPS installation

    CERN Multimedia

    1975-01-01

    ...., Guenther Loehr, Hans Horisberger walk along the SPS tunnel: here, on the right, an absorber block of 22 tons for beam dumping in the external beam lines. The chariot serves for the installation of the block.

  1. Supplemental Analysis Survey of C&P Telephone Inside Wiring.

    Science.gov (United States)

    1986-10-01

    telephone company facilities in 1984. In 1985, among other actions favorable to deregulation and detariffing of inside wiring, the FCC proposed to detariff ...installation of inside wiring, detariff the maintenance of all inside wiring, treat all inside wiring as customer premise equipment and pass ownership...85-148, 50 Fed. let. 13991 (April 9, 1985), pToposing to detariff the installation of simple inside wiring and also to detariff the maintenance of all

  2. Low-Income Demand for Local Telephone Service: Effects of Lifeline and Linkup

    OpenAIRE

    Daniel Ackerberg; Michael Riordan; Gregory Rosston; Bradley Wimmer

    2008-01-01

    A comprehensive data set on local telephone service prices is used to evaluate the effect of Lifeline and Linkup programs on the telephone penetration rates of low-income households in the United States. Lifeline and Linkup programs respectively subsidize the monthly subscription and initial installation charges of eligible low-income households. Telephone penetration rates are explained by an estimated nonlinear function of local service characteristics (including subsidized prices) and the ...

  3. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  4. 47 CFR 22.925 - Prohibition on airborne operation of cellular telephones.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Prohibition on airborne operation of cellular... CARRIER SERVICES PUBLIC MOBILE SERVICES Cellular Radiotelephone Service § 22.925 Prohibition on airborne operation of cellular telephones. Cellular telephones installed in or carried aboard airplanes, balloons or...

  5. Elaboration and installation of technology of on-line diagnostics of important equipment damage as a procedure of NPP lifetime management

    International Nuclear Information System (INIS)

    Bakirov, M.; Povarov, V.

    2012-01-01

    In contrast to conventional approaches used for diagnostics (i.e. when inspection results are used as data for numerical calculative strength analysis) the specific feature of the new proposed approach consists in a fact that the approach is based on application of the 'inverse problem' principle. As regards to implementation of the proposed new approach, first of all a detailed numerical calculative finite-element model of the monitored equipment must be developed. Results of preliminary calculations allow to make reasonable selection of definite installation places and types of control sensors intended for more effective and precise work of the calculative model. As a rule, the control sensors are high-temperature strain gauges, temperature probes, pressure, acceleration and displacement sensors, as well as acoustic-emission and ultrasonic sensors used for monitoring of actual defectiveness kinetics in the zone of potential damaging. All the sensors work in the on-line mode during several years of operation, the optimal frequency of data records is selected, all recorded data after prompt processing are transferred to the finite-element calculative modulus for strength calculations of a monitored zone. Software for strength calculation must be based on an individual calculative code, since it should also work in the on-line mode. Comprehensible strength analysis in conjunction with obtained results of defectiveness kinetics monitoring allow not only to foresee the most unfavorable scenario resulting to damaging, but also to have a possibility for prompt analysis and elaboration of compensating measures allowing to reduce operational loadings. In the report the results of development and practical application of the new approach at NPPs and corresponding technology are presented. (author)

  6. Project installation the large equipment in line system in Brazil. Gas export line valve P-40 FPSO-MLS. Field Marlim Sul, Campos Basin, Brazil; Operacao de instalacao do maior equipamento no sistema in line ja realizado no Brasil. Valvula do gasoduto P-40 X FPSO-MLS. Campo de Marlim Sul, Bacia de Campos, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Marques, Marcos Antonio Rodrigues; Fernandes, Paulo Tavares [PETROBRAS, Campos dos Goytacases, RJ (Brazil). Exploracao e Producao

    2005-07-01

    This work will approach the current level of development of the installation of connected underwater equipment to flexible lines in the underwater engineering operations in Campos' Basin. The project will show studies, analysis and simulations (through software developed by PETROBRAS) about the installation of the largest equipment laid in the 'in-line' system (connected to flexible lines) in Brazil - and one of the largest of the world: the ESDV (Emergency Shut Down Valve) of the gas pipeline P-40 x FPSO-MLS, in the South Marlim field, in Campos' Basin. This ESDV, of about 18.000 kg, 4 m height and 6,5 m length, has the purpose of assuring the safety conditions on the facilities, interrupting the gas flow exported for P-40 in case of emergency situations. Its installation opened a new alternative in releasing underwater equipment, using the ships that install the flexible lines. This operation occurred in June, 2004, and required the use of a second vessel for support and monitoring of the ESDV laying. The ESDV was installed at 400 m from FPSO-MLS, in a water depth of 1.137 m. This method shall be used broadly by the company in the implantation of the new units of Campos' Basin, and the upcoming studies must consider the gradual increase of the water depth in the new projects. This work will focus the technological development in this area, and one of its purposes is to foresee the future difficulties that can appear in the implantation of the production systems in deep and ultra-deep waters. (author)

  7. A Sandia telephone database system

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, S.D.; Tolendino, L.F.

    1991-08-01

    Sandia National Laboratories, Albuquerque, may soon have more responsibility for the operation of its own telephone system. The processes that constitute providing telephone service can all be improved through the use of a central data information system. We studied these processes, determined the requirements for a database system, then designed the first stages of a system that meets our needs for work order handling, trouble reporting, and ISDN hardware assignments. The design was based on an extensive set of applications that have been used for five years to manage the Sandia secure data network. The system utilizes an Ingres database management system and is programmed using the Application-By-Forms tools.

  8. Maintenance of CERN telephone exchanges

    CERN Multimedia

    2005-01-01

    A maintenance of CERN telephone exchanges will be performed on 21st, 22nd, 23rd, 24th of September from 7 p.m. to 9 p.m. Disturbances or even interruptions of telephony services may occur during this lapse of time. We apology in advance for any inconveniences that this may cause.

  9. Intervention among Suicidal Men: Future Directions for Telephone Crisis Support Research.

    Science.gov (United States)

    Hunt, Tara; Wilson, Coralie J; Woodward, Alan; Caputi, Peter; Wilson, Ian

    2018-01-01

    Telephone crisis support is a confidential, accessible, and immediate service that is uniquely set up to reduce male suicide deaths through crisis intervention. However, research focusing on telephone crisis support with suicidal men is currently limited. To highlight the need to address service delivery for men experiencing suicidal crisis, this perspective article identifies key challenges facing current telephone crisis support research and proposes that understanding of the role of telephone crisis helplines in supporting suicidal men may be strengthened by careful examination of the context of telephone crisis support, together with the impact this has on help-provision for male suicidal callers. In particular, the impact of the time- and information-poor context of telephone crisis support on crisis-line staff's identification of, and response to, male callers with thoughts of suicide is examined. Future directions for research in the provision of telephone crisis support for suicidal men are discussed.

  10. LINES

    Directory of Open Access Journals (Sweden)

    Minas Bakalchev

    2015-10-01

    Full Text Available The perception of elements in a system often creates their interdependence, interconditionality, and suppression. The lines from a basic geometrical element have become the model of a reductive world based on isolation according to certain criteria such as function, structure, and social organization. Their traces are experienced in the contemporary world as fragments or ruins of a system of domination of an assumed hierarchical unity. How can one release oneself from such dependence or determinism? How can the lines become less “systematic” and forms more autonomous, and less reductive? How is a form released from modernistic determinism on the new controversial ground? How can these elements or forms of representation become forms of action in the present complex world? In this paper, the meaning of lines through the ideas of Le Corbusier, Leonidov, Picasso, and Hitchcock is presented. Spatial research was made through a series of examples arising from the projects of the architectural studio “Residential Transformations”, which was a backbone for mapping the possibilities ranging from playfulness to exactness, as tactics of transformation in the different contexts of the contemporary world.

  11. Telephoning

    CERN Document Server

    Bruce, Kay

    1994-01-01

    This is part of a series of books, which gives training in key business communication skills. Emphasis is placed on building awareness of language appropriateness and fluency in typical business interactions. This new edition is in full colour.

  12. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  13. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  14. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  15. Health aspects of cellular mobile telephones

    International Nuclear Information System (INIS)

    Garn, H.

    1996-01-01

    Cellular mobile telephones are one of the main topics among health aspects of electromagnetic fields. In many countries, the number of people opposing communication towers is on the rise. Lawsuits against telecommunication and power line companies have been filed. All this makes people doubt the safety of electromagnetic fields. With respect to cellular phones, there are two scenarios: * Exposure of the operators of hand-held terminals (HHT). * Exposure of the general public from base stations (BS). In the first case, the transmit antenna of the HHT is very close to the human body. For normal operation, the distance will roughly be 2 - 3 cm. The transmitter power of the HHT is comparatively low, but there is a considerable fraction of the radiated electromagnetic energy penetrating the tissue. Considering the second case, BS transmitter powers are by a factor of 100-1000 higher, but the distance between antenna and the human body is by a factor of 1000-100,000 greater, as far as areas of unrestricted public access are concerned. As the power density of an electromagnetic wave decreases inversely proportional to the square of the distance, exposure of the public is always significantly (by many orders of magnitude) lower than exposure of operators of HHTs. Some well-known interaction mechanisms of microwave radiation with the human body have been very well-established today. In some other areas, there is still a need for further research. This paper summarizes present knowledge on human safety with mobile telephone systems. (author)

  16. Role of telephone triage in obstetrics.

    Science.gov (United States)

    Manning, Nirvana Afsordeh; Magann, Everett F; Rhoads, Sarah J; Ivey, Tesa L; Williams, Donna J

    2012-12-01

    The telephone has become an indispensable method of communication in the practice of obstetrics. The telephone is one of the primary methods by which the patient makes her appointments and contacts her health care provider for advice, reassurance, and referrals. Current methods of telephone triage include personal at the physicians' office, telephone answering services, labor and delivery nurses, and a dedicated telephone triage system using algorithms. Limitations of telephone triage include the inability of the provider to see the patient and receive visual clues from the interaction and the challenges of obtaining a complete history over the telephone. In addition, there are potential safety and legal issues with telephone triage. To date, there is insufficient evidence to either validate or refute the use of a dedicated telephone triage system compared with a traditional system using an answering service or nurses on labor and delivery. Obstetricians and gynecologists, family physicians. After completing this CME activity, physicians should be better able to analyze the scope of variation in telephone triage across health care providers and categorize the components that go into a successful triage system, assess the current scope of research in telephone triage in obstetrics, evaluate potential safety and legal issues with telephone triage in obstetrics, and identify issues that should be addressed in any institution that is using or implementing a system of telephone triage in obstetrics.

  17. Nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  18. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  19. Interactive water monitoring system accessible by cordless telephone

    Science.gov (United States)

    Volpicelli, Richard; Andeweg, Pierre; Hagar, William G.

    1985-12-01

    A battery-operated, microcomputer-controlled monitoring device linked with a cordless telephone has been developed for remote measurements. This environmental sensor is self-contained and collects and processes data according to the information sent to its on-board computer system. An RCA model 1805 microprocessor forms the basic controller with a program encoded in memory for data acquisition and analysis. Signals from analog sensing devices used to monitor the environment are converted into digital signals and stored in random access memory of the microcomputer. This remote sensing system is linked to the laboratory by means of a cordless telephone whose base unit is connected to regular telephone lines. This offshore sensing system is simply accessed by a phone call originating from a computer terminal in the laboratory. Data acquisition is initiated upon request: Information continues to be processed and stored until the computer is reprogrammed by another phone call request. Information obtained may be recalled by a phone call after the desired environmental measurements are finished or while they are in progress. Data sampling parameters may be reset at any time, including in the middle of a measurement cycle. The range of the system is limited only by existing telephone grid systems and by the transmission characteristics of the cordless phone used as a communications link. This use of a cordless telephone, coupled with the on-board computer system, may be applied to other field studies requiring data transfer between an on-site analytical system and the laboratory.

  20. Bandwidth Extension of Telephone Speech Aided by Data Embedding

    Directory of Open Access Journals (Sweden)

    Sagi Ariel

    2007-01-01

    Full Text Available A system for bandwidth extension of telephone speech, aided by data embedding, is presented. The proposed system uses the transmitted analog narrowband speech signal as a carrier of the side information needed to carry out the bandwidth extension. The upper band of the wideband speech is reconstructed at the receiving end from two components: a synthetic wideband excitation signal, generated from the narrowband telephone speech and a wideband spectral envelope, parametrically represented and transmitted as embedded data in the telephone speech. We propose a novel data embedding scheme, in which the scalar Costa scheme is combined with an auditory masking model allowing high rate transparent embedding, while maintaining a low bit error rate. The signal is transformed to the frequency domain via the discrete Hartley transform (DHT and is partitioned into subbands. Data is embedded in an adaptively chosen subset of subbands by modifying the DHT coefficients. In our simulations, high quality wideband speech was obtained from speech transmitted over a telephone line (characterized by spectral magnitude distortion, dispersion, and noise, in which side information data is transparently embedded at the rate of 600 information bits/second and with a bit error rate of approximately . In a listening test, the reconstructed wideband speech was preferred (at different degrees over conventional telephone speech in of the test utterances.

  1. Bandwidth Extension of Telephone Speech Aided by Data Embedding

    Directory of Open Access Journals (Sweden)

    David Malah

    2007-01-01

    Full Text Available A system for bandwidth extension of telephone speech, aided by data embedding, is presented. The proposed system uses the transmitted analog narrowband speech signal as a carrier of the side information needed to carry out the bandwidth extension. The upper band of the wideband speech is reconstructed at the receiving end from two components: a synthetic wideband excitation signal, generated from the narrowband telephone speech and a wideband spectral envelope, parametrically represented and transmitted as embedded data in the telephone speech. We propose a novel data embedding scheme, in which the scalar Costa scheme is combined with an auditory masking model allowing high rate transparent embedding, while maintaining a low bit error rate. The signal is transformed to the frequency domain via the discrete Hartley transform (DHT and is partitioned into subbands. Data is embedded in an adaptively chosen subset of subbands by modifying the DHT coefficients. In our simulations, high quality wideband speech was obtained from speech transmitted over a telephone line (characterized by spectral magnitude distortion, dispersion, and noise, in which side information data is transparently embedded at the rate of 600 information bits/second and with a bit error rate of approximately 3⋅10−4. In a listening test, the reconstructed wideband speech was preferred (at different degrees over conventional telephone speech in 92.5% of the test utterances.

  2. The Thin Green Line: An Assessment of DoD’s Readiness and Environmental Protection Initiative to Buffer Installation Encroachment

    Science.gov (United States)

    2007-01-01

    degraded natural ecosys- tems so much that few wild bees are left. Farmers who relied on wild bees for pollination must now rent bees commercially...around military installations, noise and air pollution, endangered species and critical habitat, wetlands , water quality and supply, cultural resources...encroachment issues:1 noise pollution endangered species and critical habitat wetlands water quality and supply air pollution and quality cultural

  3. Call Centre- Computer Telephone Integration

    Directory of Open Access Journals (Sweden)

    Dražen Kovačević

    2012-10-01

    Full Text Available Call centre largely came into being as a result of consumerneeds converging with enabling technology- and by the companiesrecognising the revenue opportunities generated by meetingthose needs thereby increasing customer satisfaction. Regardlessof the specific application or activity of a Call centre, customersatisfaction with the interaction is critical to the revenuegenerated or protected by the Call centre. Physical(v, Call centreset up is a place that includes computer, telephone and supervisorstation. Call centre can be available 24 hours a day - whenthe customer wants to make a purchase, needs information, orsimply wishes to register a complaint.

  4. Fuel cells for telephone networks

    International Nuclear Information System (INIS)

    Wells, J.D.; Scott, D.S.

    1993-01-01

    Critical telephone network systems are currently protected from electric utility power failures by a backup system consisting of lead-acid batteries and an engine-alternator. It is considered here an alternate power system where less expensive off-peak commercial electricity electrolyses water, while fuel cells draw continuously on the stored gas products to provide direct current for the protected equipment. The lead acid batteries are eliminated. The benefits and costs of the existing and alternate systems in scenarios with various system efficiencies, capital costs, and electric utility rates and incentives, are compared. In today's conditions, the alternate system is not economical; however, cost and performance feasibility domains are identified. 2 figs., 4 tabs., 12 refs

  5. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, K.

    1988-01-01

    This chapter highlights the legal problems raised by the concept of a border installation. Using the Cattenom nuclear power plant as an example, the author describes the different stages of the legal conflict raised by construction of the plant and analyses the relationship between French administrative law and some provisions of the Euratom Treaty. Based on the Treaty, the Community institutions have adopted directives to strengthen inter-State co-operation and consultation between neighbouring countries. He observes that these principles of co-operation, consultation and vigilance already exist in public international law; however, international case law has not yet made it possible to establish the strict liability of the constructing state in case of a nuclear accident (NEA) [fr

  6. Some of the QRL team in UJ22 of the LHC tunnel, where the last sector of the cryogenic distribution line was installed.

    CERN Multimedia

    Viviane Li

    2006-01-01

    The cryogenic distribution line "the QRL" is a circle built in 8 sectors, each approximately 3 km in length. It will circulate helium in liquid and gas phases, at different temperatures and pressures, to provide the cryogenic conditions for the superconducting magnets in the LHC tunnel.

  7. For whom bell toils: medical imaging by telephone.

    Science.gov (United States)

    Kuhfeld, A W

    1991-01-01

    The use of the induction balance, which was invented by Alexander Graham Bell to cancel out line interference on his telephone, to determine the location of bullets inside the human body is discussed. Experiments conducted to locate a bullet in the body of US President Garfield, who had been shot by an assassin in 1881, are described. The trials on Garfield were unsuccessful, but the approach was later perfected by Bell.

  8. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work on the CERN telephone exchanges will be performed on 10 July from 8 p.m. to midnight. During this intervention, the fixed telephone services, audioconference services and GSM calls made via the 333 prefix may be disrupted. However, the CCC and the fire brigade will be reachable at all times. For more details about this maintenance work, please call the telephone switchboard on 76111 or send an e-mail. Telecom SectionIT/CS

  9. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    A maintenance of the CERN telephone exchanges will be performed on the 10th of July from 8 p.m. to midnight. During this intervention, the fixed telephone services, audioconference services, and GSM calls made via the 333 prefix may be disrupted. However, the CCC and the fire brigade will be reachable at any time. For more details about this maintenance, please contact the telephone switchboard at 76111 or by email. Telecom Section IT/CS

  10. Recommendations for main line block valves installation in gas pipelines; Recomendacoes para instalacao de valvulas de bloqueio de linha tronco em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Oliveira, Valeriano Duque de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Cases of gas pipelines block valves and its pneumatic actuators presenting problems during the final pipeline commissioning and pre-operation phases, like internal leaks, leaking to the atmosphere, pneumatic circuit defects caused by water and debris, are nearly common. The majority can be avoided if a series of measuring are to be planned and implemented, as well as if an adequate planning of commissioning operations and line gasification, valves and actuators, are to be applied. This paper shows the practical experience in the construction and commissioning of valves and its actuators in the Bolivia-Brazil gas pipeline, which, in the first construction phase had a series of problems. After the diagnosis a set of procedures was implemented in the secondary construction phase, resulting in insignificant problems detected. All measures and procedures taken in the planning process, as well as additional aspects related to the main line valve design, its by-passes and supports, are demonstrated. (author)

  11. Telephone calls by individuals with cancer.

    Science.gov (United States)

    Flannery, Marie; McAndrews, Leanne; Stein, Karen F

    2013-09-01

    To describe symptom type and reporting patterns found in spontaneously initiated telephone calls placed to an ambulatory cancer center practice. Retrospective, descriptive. Adult hematology oncology cancer center. 563 individuals with a wide range of oncology diagnoses who initiated 1,229 telephone calls to report symptoms. Raw data were extracted from telephone forms using a data collection sheet with 23 variables obtained for each phone call, using pre-established coding criteria. A literature-based, investigator-developed instrument was used for the coding criteria and selection of which variables to extract. Symptom reporting, telephone calls, pain, and symptoms. A total of 2,378 symptoms were reported by telephone during the four months. At least 10% of the sample reported pain (38%), fatigue (16%), nausea (16%), swelling (12%), diarrhea (12%), dyspnea (10%), and anorexia (10%). The modal response was to call only one time and to report only one symptom (55%). Pain emerged as the symptom that most often prompted an individual to pick up the telephone and call. Although variation was seen in symptom reporting, an interesting pattern emerged with an individual reporting on a solitary symptom in a single telephone call. The emergence of pain as the primary symptom reported by telephone prompted educational efforts for both in-person clinic visit management of pain and prioritizing nursing education and protocol management of pain reported by telephone. Report of symptoms by telephone can provide nurses unique insight into patient-centered needs. Although pain has been an important focus of education and research for decades, it remains a priority for individuals with cancer. A wide range in symptom reporting by telephone was evident.

  12. Nuclear installations and their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October 15, 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (authors)

  13. Upgrade of the CERN telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, maintenance work will be carried out on the CERN switching centre between 8.00 p.m. and 10.00 p.m. on Monday 9 October. Telephone services may be disrupted and possibly even interrupted during this time. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  14. Installation and operation of a radio-frequency quadrupole cooler and buncher and offline commissioning of the TRIGA-SPEC ion beam preparation transfer line

    International Nuclear Information System (INIS)

    Beyer, Thomas

    2014-01-01

    The dominant fraction of elements heavier than iron was created in stellar nucleosynthesis by neutron-capture reactions. The isotopic compositions of these elements are the fingerprints of the involved processes, and a huge amount of experimental data on these isotopes is required to support corresponding astrophysical calculations and models. The TRIGA-SPEC experiment aims to contribute to these data by the measurement of ground-state properties of neutron-rich heavy nuclides. It consists of the Penning-trap mass spectrometer TRIGA-TRAP for the determination of masses, Q-values and binding energies, and the collinear laser spectroscopy setup TRIGALASER for the determination of charge radii, nuclear spins, and moments. The nuclides of interest are produced by neutron-induced fission of an actinide target inside the research reactor TRIGA Mainz and ionized in an online ion source. In the context of this thesis, the two experiments were coupled to the reactor, completing the ion beam preparation transfer line. This included the implementation and commissioning of a radio-frequency quadrupole for the emittance reduction and accumulation of the ions. The functionality of the ion beam preparation was verified by successful test measurements of stable nuclides produced in the online ion source.

  15. Evaluating the privacy properties of telephone metadata

    Science.gov (United States)

    Mayer, Jonathan; Mutchler, Patrick; Mitchell, John C.

    2016-01-01

    Since 2013, a stream of disclosures has prompted reconsideration of surveillance law and policy. One of the most controversial principles, both in the United States and abroad, is that communications metadata receives substantially less protection than communications content. Several nations currently collect telephone metadata in bulk, including on their own citizens. In this paper, we attempt to shed light on the privacy properties of telephone metadata. Using a crowdsourcing methodology, we demonstrate that telephone metadata is densely interconnected, can trivially be reidentified, and can be used to draw sensitive inferences. PMID:27185922

  16. Mapping crime scenes and cellular telephone usage

    CSIR Research Space (South Africa)

    Schmitz, Peter MU

    2000-12-01

    Full Text Available This paper describes a method that uses a desktop geographical information system (GIS) to plot cellular telephone conversations made when crimes are committed, such as hijackings, hostage taking, kidnapping, rape and murder. The maps produced...

  17. Cellular telephone use and cancer risk

    DEFF Research Database (Denmark)

    Schüz, Joachim; Jacobsen, Rune; Olsen, Jørgen H.

    2006-01-01

    BACKGROUND: The widespread use of cellular telephones has heightened concerns about possible adverse health effects. The objective of this study was to investigate cancer risk among Danish cellular telephone users who were followed for up to 21 years. METHODS: This study is an extended follow......-up of a large nationwide cohort of 420,095 persons whose first cellular telephone subscription was between 1982 and 1995 and who were followed through 2002 for cancer incidence. Standardized incidence ratios (SIRs) were calculated by dividing the number of observed cancer cases in the cohort by the number...... expected in the Danish population. RESULTS: A total of 14,249 cancers were observed (SIR = 0.95; 95% confidence interval [CI] = 0.93 to 0.97) for men and women combined. Cellular telephone use was not associated with increased risk for brain tumors (SIR = 0.97), acoustic neuromas (SIR = 0.73), salivary...

  18. Opto-Acoustic Telephone Study.

    Science.gov (United States)

    1983-01-01

    hook acknowledge, line busy monitoring, misdialing, receiver in permanent off hook position and touch tone or dial recognition . The wide bandwidth of... Speech Communication Over a Fiber Lightguide", Bell Sys. Tech. J. 58, 1735-41, September 1979. 40. Lord Rayleigh, "The Photophone", Nature XXIII, pp...date May 24, 1JIM. To .i11 ihou, it usay concern: rate otisslerrit tion,anud were lousd ensough to lieit ksov% it that w’e, ALEXA ’.Mn: UatA𔃻 be easily

  19. Doctor-patient communication on the telephone.

    Science.gov (United States)

    Curtis, P; Evens, S

    1989-01-01

    Since its invention, the telephone has been an important tool in medical practice, particularly for primary care physicians. Approximately half the calls made to a physician's office during regular consulting hours are for clinical problems and most are handled effectively over the phone without an immediate office visit. Telephone encounters are generally very brief, and managing such calls requires a pragmatic approach that is often quite different from the approach taken in the office visit. The telephone encounter should be recognized and recorded as a specific medical interaction in the medical chart for both clinical and legal reasons. Effective telephone encounters depend on good communication skills; decision making regarding disposition is a major goal. The physician's perception of a medical problem may be different from the patient's; patients are frequently seeking advice and reassurance rather than diagnosis and treatment, and may call because of anxiety and psychological stress. For physicians and their families who are not prepared for after-hours telephone encounters, calls that interrupt more "legitimate" activities may result in anger or frustration for the physician and dissatisfaction for the patient.

  20. Gas data transmission system by satellite telephone; Systeme de transmission de donnees sur le gaz utilisant le telephone par satellite

    Energy Technology Data Exchange (ETDEWEB)

    Ogasawara, S.; Tanji, A. [Dengineer Co., Ltd (Japan); Akiyama, S. [Buyo Gas Company (Japan)

    2000-07-01

    Dengineer Co., Ltd. and Buyo Gas Co., Ltd. had been developing and using the data and alarm transmission system by public telephone since 1984, that was first practical use in Japan. It is very important for business management that adjusts the production value of gas by measuring gas pressures in each governor. Also, it is indispensable to know the accident of gas leakage or abnormal gas pressure quickly. But this convenient system is not spread yet in Japanese market cause of the following reasons. - Take time and cost for installation of terminal station. - Terminal station is apt to damage by thunder. - Big disaster must stop working this system. In order to solve those problems, we have developed and tested the system organized of the satellite telephone system and solar cells for power. This system will be very useful for wide place, not only Japanese market but also the area, which has no electricity and phone. Also, it will be convenient for international rescue as is able to access it from the foreign countries. (authors)

  1. [Psychometric validation of the telephone memory test].

    Science.gov (United States)

    Ortiz, T; Fernández, A; Martínez-Castillo, E; Maestú, F; Martínez-Arias, R; López-Ibor, J J

    1999-01-01

    Several pathologies (i.e. Alzheimer's disease) that courses with memory alterations, appears in a context of impaired cognitive status and mobility. In recent years, several investigations were carried out in order to design short batteries that detect those subjects under risk of dementia. Some of this batteries were also design to be administrated over the telephone, trying to overcome the accessibility limitations of this patients. In this paper we present a battery (called Autotest de Memoria) essentially composed by episodic and semantic memory tests, administered both over the telephone and face to face. This battery was employed in the cognitive assessment of healthy controls and subjects diagnosed as probable Alzheimer's disease patients. Results show the capability of this battery in order to discriminate patients and healthy controls, a great sensibility and specificity, and a nearly absolute parallelism of telephone and face to face administrations. These data led us to claim the usefulness and practicality of our so called Memoria>.

  2. Automatic Smoker Detection from Telephone Speech Signals

    DEFF Research Database (Denmark)

    Poorjam, Amir Hossein; Hesaraki, Soheila; Safavi, Saeid

    2017-01-01

    This paper proposes an automatic smoking habit detection from spontaneous telephone speech signals. In this method, each utterance is modeled using i-vector and non-negative factor analysis (NFA) frameworks, which yield low-dimensional representation of utterances by applying factor analysis...... method is evaluated on telephone speech signals of speakers whose smoking habits are known drawn from the National Institute of Standards and Technology (NIST) 2008 and 2010 Speaker Recognition Evaluation databases. Experimental results over 1194 utterances show the effectiveness of the proposed approach...... for the automatic smoking habit detection task....

  3. The effectiveness of the installation of a mobile voice communication system in a university hospital.

    Science.gov (United States)

    Hanada, Eisuke; Fujiki, Tadayoshi; Nakakuni, Hideaki; Sullivan, Corbet Vernon

    2006-04-01

    In large hospitals, collaborative clinical practice is currently emphasized, with members of various departments expected to work as a team. The importance of accurate communication among the team members is of utmost importance. To improve such communication, the introduction of mobile voice communication systems has received much attention in Japan. Shimane University Hospital also introduced a Personal Handy-phone System (PHS) for doctors. In the traditional setting, much time was wasted searching for doctors through multiple calls on fixed-line telephones. In order to measure the effectiveness of our system, the change in the number of calls made on fixed-line telephones before and after PHS installation was compared. The total number of calls was reduced by more than 35%, and the number of calls to the wards on weekdays was reduced by half. Mobile telecommunication systems with small output power, such as PHS, are known to cause little interference with medical devices which makes it possible to use mobile voice communication safely in hospitals. The improvement in communication by this systems resulted in an improvement in labor efficiency.

  4. Work on the CERN telephone exchanges

    CERN Multimedia

    2006-01-01

    Corrective maintenance work on the CERN telephone exchanges will be carried out on 13th March 2006, resulting in service interruptions across the west area of the Meyrin site between 9.00 p.m. and 11.00 p.m. We apologise for any inconvenience this may cause. CERN TELECOM Service Tel.: 76111 GSM: 160101

  5. Maintenance of CERN telephone exchanges - erratum

    CERN Document Server

    2005-01-01

    The next maintenance of CERN telephone exchanges will be performed on 19th, 20th, 21st, and 22nd of September from 7 p.m. to 9 p.m. Disturbances or even interruptions of telephony services may occur during this lapse of time. We apology in advance for any inconveniences that this may cause.

  6. Maintaining clinical governance when giving telephone advice.

    Science.gov (United States)

    Alazawi, William; Agarwal, Kosh; Suddle, Abid; Aluvihare, Varuna; Heneghan, Michael A

    2013-10-01

    Delivering excellent healthcare depends on accurate communication between professionals who may be in different locations. Frequently, the first point of contact with the liver unit at King's College Hospital (KCH) is through a telephone call to a specialist registrar or liver fellow, for whom no case notes are available in which to record information. The aim of this study was to improve the clinical governance of telephone referrals and to generate contemporaneous records that could be easily retrieved and audited. An electronic database for telephone referrals and advice was designed and made securely available to registrars in our unit. Service development in a tertiary liver centre that receives referrals from across the UK and Europe. Demographic and clinical data were recorded prospectively and analysed retrospectively. Data from 350 calls were entered during 5 months. The information included the nature and origin of the call (200 from 75 different institutions), disease burden and severity of disease among the patients discussed with KCH, and outcome of the call. The majority of cases were discussed with consultants or arrangements were made for formal review at KCH. A telephone referrals and advice database provides clinical governance, serves as a quality indicator and forms a contemporaneous record at the referral centre. Activity data and knowledge of disease burden help to tailor services to the needs of referrers and commissioners. We recommend implementation of similar models in other centres that give extramural verbal advice.

  7. 75 FR 13471 - Telephone Consumer Protection

    Science.gov (United States)

    2010-03-22

    ... Consumer Protection Act (TCPA) that would harmonize those rules with the Federal Trade Commission's (FTC's... Consumer Protection Act (TCPA) that would harmonize those rules with the Federal Trade Commission's (FTC's...] Telephone Consumer Protection AGENCY: Federal Communications Commission. ACTION: Proposed rule. SUMMARY: In...

  8. Strategies for Suicide Intervention by Telephone.

    Science.gov (United States)

    Hinson, Jennifer

    1982-01-01

    Describes techniques helpful for telephone counselors dealing with suicide intervention, including reinstating control, reducing anxiety through problem clarification, and providing hope by active listening and tolerance of dispositions. The use of time-outs and detective work is also discussed. (JAC)

  9. Rehyd development and installation report

    International Nuclear Information System (INIS)

    Schuch, R.L.; Woodall, H.N.

    1977-12-01

    Rehyd, a low-impedance, HYDRA-type, water transmission line for bremsstrahlung exposures, was installed on the north side of the REBA facility. Rehyd produces 300 kA beams of 1.2 MeV electrons with a pulse width of 170 ns. Nominal x-ray exposure dose capabilities of 7 cal/g and 20 to 25 kJ were realized thus far. A description is given of the specific design parameters and facility layouts including the unique features of the REBA Marx generator/Rehyd line energy-transfer system. Diode configurations, magnetic-field applications, and output measurements are also presented

  10. Closure of the telephone switchboard at 5 p.m. on 20 December

    CERN Multimedia

    Communications Support Section

    2013-01-01

    Exceptionally, the telephone switchboard will close at 5 p.m. on Friday 20 December, instead of 6 p.m. (usual time), to allow time for all systems to be properly closed before the annual closure.   Therefore, switchboard operator assistance to transfer calls from/to external lines will cease. All other phone services will run as usual.

  11. Improvement of Metroliner Telephone Channel Capacity and Modeling of Telephone Channel Demands

    Science.gov (United States)

    1972-03-01

    The channel capacity of the present Metroliner telephone system is analyzed and methods are proposed to increase that capacity without increasing the overall bandwidth. To determine the number of channels required, calculations have been carried out ...

  12. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  13. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  14. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  15. Work on the CERN telephone exchanges

    CERN Multimedia

    2004-01-01

    Corrective maintenance work on the CERN telephone exchanges will be carried out on 23 September 2004, resulting in interruptions of service across the whole CERN site between 6:00 a.m. and 8:00 a.m. and from 7:00 p.m. onwards. We apologise for any inconvenience this may cause. CERN TELECOM Service Tel.: 76111 GSM: 160026- 163610 Calls between GSM mobile phones will not be affected.

  16. Diffusion and Advertising: The German Telephone Campaign

    OpenAIRE

    Hermann Simon; Karl-Heinz Sebastian

    1987-01-01

    The goal of the present paper is to investigate the influence of advertising on the diffusion of new telephones in West Germany. Several alternative ways of integrating advertising into the well-known Bass-diffusion-model are suggested and empirically tested. The econometric investigation yields results which are consistent with the behavioral assumption. A model which assumes that advertising mainly influenced the demand of imitators is accepted as the most valid representation of reality. T...

  17. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  18. 49 CFR 192.321 - Installation of plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  19. Willingness to pay for rural telephone services: Implications for rural ...

    African Journals Online (AJOL)

    WTP) for rural telephone services and the implications on poverty reduction in Southeast Nigeria. The key research problem was the inability of the telephone providers or regulatory agencies to estimate the amount the people were willing to pay ...

  20. 7 CFR 1737.60 - Telephone loan budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Telephone loan budget. 1737.60 Section 1737.60... Cost Estimation Procedures § 1737.60 Telephone loan budget. (a) RUS shall prepare a “Telephone Loan Budget” (RUS Form 493) showing all costs for the proposed project and the amount of loan and nonloan...

  1. 7 CFR 1744.63 - The telephone loan budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false The telephone loan budget. 1744.63 Section 1744.63... Disbursement of Funds § 1744.63 The telephone loan budget. When the loan is made, RUS provides the borrower a Telephone Loan Budget, RUS Form 493. This budget divides the loan into budget accounts such as “Engineering...

  2. Telecommunications Policy Research Conference. Subsidies in Telephone Pricing Section. Papers.

    Science.gov (United States)

    Telecommunications Policy Research Conference, Inc., Washington, DC.

    Three papers consider the provision of telephone service to rural and/or low income customers. The first paper, "An Analysis of Telephone Penetration" (Alexander Belinfante), analyzes the relationship between telephone penetration (the proportion of households with phone service) and prices, household income, and other factors. This…

  3. The telephone in family practice | Furman | South African Medical ...

    African Journals Online (AJOL)

    In a time-and-motion study in family practice it was found that 35,8% of all patient contact was per telephone. The study further revealed that 12,3% of total practice time was spent on the telephone, stressing its importance as a useful tool. in family practice. The study supports others which suggest that 'telephone medicine' ...

  4. Environmental assessment [of nuclear installations

    International Nuclear Information System (INIS)

    Townsley, M.

    1989-01-01

    The European Community has introduced a directive which instructs that for all projects likely to have a significant effect on the environment consent should only be given after a rigorous assessment of such effects has been carried out and presented as an environmental statement. Projects requiring environmental assessment include nuclear power stations, any thermal power station over 300MW, any radioactive waste storage or disposal facility, any installation which produces electricity, power lines, installations for fuel production, fuel reprocessing, radioactive waste processing and fuel enrichment. The statement must include a description of the likely effects, direct and indirect, on the environment of the development, with reference to human beings, flora, fauna, soil, water, air, climate, landscape, interactions of two or more of these, material assets and cultural heritage. Measures to avoid or remedy the impact must be included. (U.K.)

  5. The nuclear installations face to their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October fifteenth 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (author)

  6. The installation and dismantling of electrolytic cells

    International Nuclear Information System (INIS)

    Galushkin, N.V.

    1995-01-01

    This chapter of monograph is devoted to construction of aluminium electrolytic cells, their installation and dismantling. Therefore, the general characteristic and classification of aluminium electrolytic cells was considered. The anode and cathode structure was studied. The lining of cathode casing, the process of collection of anode gases, electrolytic cell cover, and electrical insulation was studied as well. The installation and dismantling of aluminium electrolytic cells was described.

  7. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  8. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  9. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  10. Lunar phases and crisis center telephone calls.

    Science.gov (United States)

    Wilson, J E; Tobacyk, J J

    1990-02-01

    The lunar hypothesis, that is, the notion that lunar phases can directly affect human behavior, was tested by time-series analysis of 4,575 crisis center telephone calls (all calls recorded for a 6-month interval). As expected, the lunar hypothesis was not supported. The 28-day lunar cycle accounted for less than 1% of the variance of the frequency of crisis center calls. Also, as hypothesized from an attribution theory framework, crisis center workers reported significantly greater belief in lunar effects than a non-crisis-center-worker comparison group.

  11. Maintenance of the telephone exchange in building 40

    CERN Multimedia

    2006-01-01

    In order to secure the power supply of the telephone exchange in Building 40, maintenance work will be done on 18th December from 7.30 am to 8 am. During this intervention, the fixed telephone services in Building 39 and 40 will be interrupted. The fixed telephone services in other CERN buildings will not be affected by this maintenance. The mobile telephone services (GSM) will not be affected. For more details, please send your questions to Standard.Telephone@cern.ch Telecom Services IT/CS

  12. Participants' views of telephone interviews within a grounded theory study.

    Science.gov (United States)

    Ward, Kim; Gott, Merryn; Hoare, Karen

    2015-12-01

    To offer a unique contribution to the evolving debate around the use of the telephone during semistructured interview by drawing on interviewees' reflections on telephone interview during a grounded theory study. The accepted norm for qualitative interviews is to conduct them face-to-face. It is typical to consider collecting qualitative data via telephone only when face-to-face interview is not possible. During a grounded theory study, exploring users' experiences with overnight mask ventilation for sleep apnoea, the authors selected the telephone to conduct interviews. This article reports participants' views on semistructured interview by telephone. An inductive thematic analysis was conducted on data pertaining to the use of the telephone interview in a grounded theory study. The data were collected during 4 months of 2011 and 6 months in 2014. The article presents an inductive thematic analysis of sixteen participants' opinions about telephone interviewing and discusses these in relation to existing literature reporting the use of telephone interviews in grounded theory studies. Overall, participants reported a positive experience of telephone interviewing. From each participants reports we identified four themes from the data: being 'phone savvy; concentrating on voice instead of your face; easy rapport; and not being judged or feeling inhibited. By drawing on these data, we argue that the telephone as a data collection tool in grounded theory research and other qualitative methodologies need not be relegated to second best status. Rather, researchers can consider telephone interview a valuable first choice option. © 2015 John Wiley & Sons Ltd.

  13. Telephone interventions for adherence to colpocytological examination

    Directory of Open Access Journals (Sweden)

    Thais Marques Lima

    Full Text Available ABSTRACT Objective: to test the effects of behavioral and educational intervention by telephone on adherence of women with inappropriate periodicity to colpocytological examination. Method: quasi-experimental study with a sample of 524 women, selected with the following inclusion criteria: be aged between 25 and 64 years, have initiated sexual activity, have inappropriate periodicity of examination and have mobile or landline phone. The women were divided into two groups for application of behavioral and educational intervention by telephone. It was used an intervention script according to the principles of Motivational Interviewing. Results: on comparing the results before and after the behavioral and educational interventions, it was found that there was a statistically significant change (p = 0.0283 with increase of knowledge of women who participated in the educational intervention. There was no change in the attitude of women of any of the groups and there was an increase of adherence to colpocytological examination in both groups (p < 0.0001, with greater adherence of women participating in the behavioral group (66.8%. Conclusion: the behavioral and educational interventions by phone were effective in the adherence of women to colpocytological examination, representing important strategies for permanent health education and promotion of care for the prevention of cervical cancer.

  14. Impact of the telephone assistive device (TAD) on stuttering severity while speaking on the telephone.

    Science.gov (United States)

    Chambers, Nola

    2009-01-01

    There is extensive experimental evidence that altered auditory feedback (AAF) can have a clinically significant effect on the severity of speech symptoms in people who stutter. However, there is less evidence regarding whether these experimental effects can be observed in naturalistic everyday settings particularly when using the telephone. This study aimed to investigate the effectiveness of the Telephone Assistive Device (TAD), which is designed to provide AAF on the telephone to people who stutter, on reducing stuttering severity. Nine adults participated in a quasi-experimental study. Stuttering severity was measured first without and then with the device in participants' naturalistic settings while making and receiving telephone calls (immediate benefit). Participants were then allowed a week of repeated use of the device following which all measurements were repeated (delayed benefit). Overall, results revealed significant immediate benefits from the TAD in all call conditions. Delayed benefits in received and total calls were also significant. There was substantial individual variability in response to the TAD but none of the demographic or speech-related factors measured in the study were found to significantly impact the benefit (immediate or delayed) derived from the TAD. Results have implications for clinical decision making for adults who stutter.

  15. Impact of telephone nursing education program for equity in healthcare.

    Science.gov (United States)

    Höglund, Anna T; Carlsson, Marianne; Holmström, Inger K; Kaminsky, Elenor

    2016-09-21

    The Swedish Healthcare Act prescribes that healthcare should be provided according to needs and with respect for each person's human dignity. The goal is equity in health for the whole population. In spite of this, studies have revealed that Swedish healthcare is not always provided equally. This has also been observed in telephone nursing. Therefore, the aim of the present study was to investigate if and how an educational intervention can improve awareness of equity in healthcare among telephone nurses. The study had a quasi-experimental design, with one intervention group and one control group. A base-line measurement was performed before an educational intervention and a follow-up measurement was made afterwards in both groups, using a study specific questionnaire in which fictive persons of different age, gender and ethnicity were assessed concerning, e.g., power over one's own life, quality of life and experience of discrimination. The educational intervention consisted of a web-based lecture, literature and a seminar, covering aspects of inequality in healthcare related to gender, age and ethnicity, and gender and intersectionality theories as explaining models for these conditions. The results showed few significant differences before and after the intervention in the intervention group. Also in the control group few significant differences were found in the second measurement, although no intervention was performed in that group. The reason might be that the instrument used was not sensitive enough to pick up an expected raised awareness of equity in healthcare, or that solely the act of filling out the questionnaire can create a sort of intervention effect. Fictive persons born in Sweden and of young age were assessed to have a higher Good life-index than the fictive persons born outside Europe and of higher age in all assessments. The results are an imperative that equity in healthcare still needs to be educated and discussed in different healthcare

  16. Identifying the core competencies of mental health telephone triage.

    Science.gov (United States)

    Sands, Natisha; Elsom, Stephen; Gerdtz, Marie; Henderson, Kathryn; Keppich-Arnold, Sandra; Droste, Nicolas; Prematunga, Roshani K; Wereta, Zewdu W

    2013-11-01

    The primary aim of this study was to identify the core competencies of mental health telephone triage, including key role tasks, skills, knowledge and responsibilities, in which clinicians are required to be competent to perform safe and effective triage. Recent global trends indicate an increased reliance on telephone-based health services to facilitate access to health care across large populations. The trend towards telephone-based health services has also extended to mental health settings, evidenced by the growing number of mental health telephone triage services providing 24-hour access to specialist mental health assessment and treatment. Mental health telephone triage services are critical to the early identification of mental health problems and the provision of timely, appropriate interventions. In spite of the rapid growth in mental health telephone triage and the important role these services play in the assessment and management of mental illness and related risks, there has been very little research investigating this area of practice. An observational design was employed to address the research aims. Structured observations (using dual wireless headphones) were undertaken on 197 occasions of mental health telephone triage over a three-month period from January to March 2011. The research identified seven core areas of mental health telephone triage practice in which clinicians are required to be competent in to perform effective mental health telephone triage, including opening the call; performing mental status examination; risk assessment; planning and action; termination of call; referral and reporting; and documentation. The findings of this research contribute to the evidence base for mental health telephone triage by articulating the core competencies for practice. The mental health telephone triage competencies identified in this research may be used to define an evidence-based framework for mental health telephone triage practice that aims to

  17. Telephone operator change: your questions answered

    CERN Multimedia

    CERN Bulletin

    2015-01-01

    CERN will be changing mobile telephone operators on 24 June. As the community prepares for the summer switchover, everyone has questions. What brought on the change? Why are we losing our old phone numbers? What kind of improvements will we see? "Just as with every contract at CERN, we issue calls for tenders every few years to ensure we are still receiving the best possible service," explains Tony Cass, from the Communication Systems group within the IT department. "As we came to the end of our contract with Sunrise, we put out a call for tenders, which was won by Swisscom. Not only is their pricing more competitive, they will also be providing better service conditions." The scope of these new service conditions is multifaceted: there will be improvements to the redundancy and reliability of the network as well as modern 4G network coverage in the LHC tunnel. "People will also see their mobile phone bills decrease," says Tony. "This will esp...

  18. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  19. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  20. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  1. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  2. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  3. Cable line engineering

    International Nuclear Information System (INIS)

    Jang, Hak Sin; Kim, Sin Yeong

    1998-02-01

    This book is about cable line engineering. It is comprised of nine chapters, which deals with summary of cable communication such as way, process of cable communication and optical communication, Line constant of transmission on primary constant, reflection and crosstalk, communication cable line of types like flat cable, coaxial cable and loaded cable, Install of communication line with types and facility of aerial line, construction method of communication line facility, Measurement of communication line, Carrier communication of summary, PCM communication with Introduction, regeneration relay system sampling and quantization and Electric communication service and general information network with mobile communication technique and satellite communication system.

  4. Tumour risk associated with use of cellular telephones or cordless desktop telephones

    OpenAIRE

    Hardell, Lennart; Mild, Kjell Hansson; Carlberg, Michael; Söderqvist, Fredrik

    2006-01-01

    Abstract Background The use of cellular and cordless telephones has increased dramatically during the last decade. There is concern of health problems such as malignant diseases due to microwave exposure during the use of these devices. The brain is the main target organ. Methods Since the second part of the 1990's we have performed six case-control studies on this topic encompassing use of both cellular and cordless phones as well as other exposures. Three of the studies concerned brain tumo...

  5. 47 CFR 68.215 - Installation of other than “fully protected” system premises wiring that serves more than four...

    Science.gov (United States)

    2010-10-01

    ... responsible supervision and control of a person who: (1) Has had at least six months of on-the-job experience... grandfathered equipment is involved) of the first piece of equipment electrically connected to the telephone... six months of on-the-job experience in the installation of telephone terminal equipment or of wiring...

  6. Mechanical Behaviour of Lined Pipe

    NARCIS (Netherlands)

    Hilberink, A.

    2011-01-01

    Installing lined pipe by means of the reeling installation method seems to be an attractive combination, because it provides the opportunity of eliminating the demanding welds from the critical time offshore and instead preparing them onshore. However, reeling of lined pipe is not yet proven

  7. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  8. Elder abuse telephone screen reliability and validity.

    Science.gov (United States)

    Buri, Hilary M; Daly, Jeanette M; Jogerst, Gerald J

    2009-01-01

    (a) To identify reliable and valid questions that identify elder abuse, (b) to assess the reliability and validity of extant self-reported elder abuse screens in a high-risk elderly population, and (c) to describe difficulties of completing and interpreting screens in a high-need elderly population. All elders referred to research-trained social workers in a community service agency were asked to participate. Of the 70 elders asked, 49 participated, 44 completed the first questionnaire, and 32 completed the duplicate second questionnaire. A research assistant administered the telephone questionnaires. Twenty-nine (42%) persons were judged abused, 12 (17%) had abuse reported, and 4 (6%) had abuse substantiated. The elder abuse screen instruments were not found to be predictive of assessed abuse or as predictors of reported abuse; the measures tended toward being inversely predictive. Two questions regarding harm and taking of belongings were significantly different for the assessed abused group. In this small group of high-need community-dwelling elders, the screens were not effective in discriminating between abused and nonabused groups. Better instruments are needed to assess for elder abuse.

  9. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  10. THE EFFECTS OF MOBILE TELEPHONING ON DRIVING PERFORMANCE

    NARCIS (Netherlands)

    BROOKHUIS, KA; DEVRIES, G; DEWAARD, D

    The effects of telephoning while driving were studied in three different traffic conditions, i.e. in light traffic on a quiet motorway, in heavy traffic on a four-lane ring-road, and in city traffic. Twelve subjects, unfamiliar with mobile telephones, drove an instrumented vehicle for one hour each

  11. Openings and Closings in Telephone Conversations between Native Spanish Speakers.

    Science.gov (United States)

    Coronel-Molina, Serafin M.

    1998-01-01

    A study analyzed the opening and closing sequences of 11 dyads of native Spanish-speakers in natural telephone conversations conducted in Spanish. The objective was to determine how closely Hispanic cultural patterns of conduct for telephone conversations follow the sequences outlined in previous research. It is concluded that Spanish…

  12. 20 CFR 638.516 - Laundry, mail, and telephone service.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Laundry, mail, and telephone service. 638.516... PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.516 Laundry, mail, and telephone service. (a) The center operator shall provide adequate laundry services and supplies at...

  13. 39 CFR 6.4 - Attendance by conference telephone call.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Attendance by conference telephone call. 6.4 Section 6.4 Postal Service UNITED STATES POSTAL SERVICE THE BOARD OF GOVERNORS OF THE U.S. POSTAL SERVICE MEETINGS (ARTICLE VI) § 6.4 Attendance by conference telephone call. For regularly scheduled meetings of...

  14. 26 CFR 49.4251-4 - Prepaid telephone cards.

    Science.gov (United States)

    2010-04-01

    ...; adding value. (i) After using the card described in Example 2, P arranges with A by telephone to have 30... EXCISE TAXES FACILITIES AND SERVICES EXCISE TAXES Communications § 49.4251-4 Prepaid telephone cards. (a... section provides rules for the application of the section 4251 tax to PTCs. (b) Definitions. The following...

  15. 49 CFR 195.52 - Telephonic notice of certain accidents.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Telephonic notice of certain accidents. 195.52... TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Annual, Accident, and Safety-Related Condition Reporting § 195.52 Telephonic notice of certain accidents. (a) At the earliest practicable moment following discovery of a...

  16. 47 CFR 42.6 - Retention of telephone toll records.

    Science.gov (United States)

    2010-10-01

    ... whether it is billing its own toll service customers for toll calls or billing customers for another... Section 42.6 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... telephone toll records. Each carrier that offers or bills toll telephone service shall retain for a period...

  17. [Potential selection bias in telephone surveys: landline and mobile phones].

    Science.gov (United States)

    Garcia-Continente, Xavier; Pérez-Giménez, Anna; López, María José; Nebot, Manel

    2014-01-01

    The increasing use of mobile phones in the last decade has decreased landline telephone coverage in Spanish households. This study aimed to analyze sociodemographic characteristics and health indicators by type of telephone service (mobile phone vs. landline or landline and mobile phone). Two telephone surveys were conducted in Spanish samples (February 2010 and February 2011). Multivariate logistic regression analyses were performed to analyze differences in the main sociodemographic characteristics and health indicators according to the type of telephone service available in Spanish households. We obtained 2027 valid responses (1627 landline telephones and 400 mobile phones). Persons contacted through a mobile phone were more likely to be a foreigner, to belong to the manual social class, to have a lower educational level, and to be a smoker than those contacted through a landline telephone. The profile of the population that has only a mobile phone differs from that with a landline telephone. Therefore, telephone surveys that exclude mobile phones could show a selection bias. Copyright © 2013 SESPAS. Published by Elsevier Espana. All rights reserved.

  18. Gesturing on the Telephone: Independent Effects of Dialogue and Visibility

    Science.gov (United States)

    Bavelas, Janet; Gerwing, Jennifer; Sutton, Chantelle; Prevost, Danielle

    2008-01-01

    Speakers often gesture in telephone conversations, even though they are not visible to their addressees. To test whether this effect is due to being in a dialogue, we separated visibility and dialogue with three conditions: face-to-face dialogue (10 dyads), telephone dialogue (10 dyads), and monologue to a tape recorder (10 individuals). For the…

  19. Brain tumour risk in relation to mobile telephone use

    DEFF Research Database (Denmark)

    Johansen, Christoffer

    2010-01-01

    The rapid increase in mobile telephone use has generated concern about possible health risks related to radiofrequency electromagnetic fields from this technology.......The rapid increase in mobile telephone use has generated concern about possible health risks related to radiofrequency electromagnetic fields from this technology....

  20. Call Us: Development of a Library Telephone Enquiry Service

    Science.gov (United States)

    Burke, Liz; Beranek, Lea

    2006-01-01

    The authors detail the trial and piloting of a telephone enquiry service (TES) at the Bundoora Campus Library at La Trobe University in order to attempt to resolve the balance between telephone and face-to-face enquiries at the library service desk. They investigated various options throughout 2001 and 2002 and settled on a centralised service…

  1. Python Introduction and Installation

    OpenAIRE

    William J. Turkel; Adam Crymble

    2012-01-01

    This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo ...

  2. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  3. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  4. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  5. Telephone: The Old Technology that is Never Old

    Directory of Open Access Journals (Sweden)

    Olubunmi Philip Aborisade

    2012-09-01

    Full Text Available Telephone technology is a technology that stands the test of time. Since it was invented in 1876 by Alexander Graham Belle, it remains the technology of all time. This article reports the major finding of a recent research, how technology transforms citizen journalism business in Nigeria. According to the research, Telephone technology has over the years emerged the major tool with which ordinary citizens in Nigeria without journalism and media background or affiliation participate in the process of news gathering, reporting and distribution. Guided by the recent use of telephone around the world by ordinary citizens to report themselves during protests through different social media outlets-Facebook, Tweeter, Youtube, the article illuminates the evergreen nature of the telephone. The article therefore concluded that the telephone technology invented in 1876 has survived the test of time. Instead of being obsolete, it blends with emerging communications technology to improve on its performance.

  6. Choosing a New Telephone System for Your Medical Practice.

    Science.gov (United States)

    Metherell, Brian

    2016-01-01

    E-mail may rule the world in other types of businesses, but for medical practices, the telephone remains the primary mode of communication with patients, specialists, and pharmacies. From making appointments to calling in prescriptions, telephones are essential to patient care. With technology changing very quickly and new capabilities coming into the medical practice, such as telemedicine and Skype, you need to know your options when choosing a new telephone system. The possibilities include on-site, cloud, and hybrid networked solutions. A wide variety of features and capabilities are available, from dozens of vendors. Of course, no matter what telephone solution you choose, you must meet regulatory compliance, particularly HIPAA, and Payment Card Industry Data Security Standard if you take credit cards. And it has to be affordable, reliable, and long lasting. This article explores what medical practices need to know when choosing a new business telephone system in order to find the right solutions for their businesses.

  7. Telephone interventions for adherence to colpocytological examination.

    Science.gov (United States)

    Lima, Thais Marques; Nicolau, Ana Izabel Oliveira; Carvalho, Francisco Herlânio Costa; Vasconcelos, Camila Teixeira Moreira; Aquino, Priscila de Souza; Pinheiro, Ana Karina Bezerra

    2017-02-06

    to test the effects of behavioral and educational intervention by telephone on adherence of women with inappropriate periodicity to colpocytological examination. quasi-experimental study with a sample of 524 women, selected with the following inclusion criteria: be aged between 25 and 64 years, have initiated sexual activity, have inappropriate periodicity of examination and have mobile or landline phone. The women were divided into two groups for application of behavioral and educational intervention by telephone. It was used an intervention script according to the principles of Motivational Interviewing. on comparing the results before and after the behavioral and educational interventions, it was found that there was a statistically significant change (p = 0.0283) with increase of knowledge of women who participated in the educational intervention. There was no change in the attitude of women of any of the groups and there was an increase of adherence to colpocytological examination in both groups (p grupos para aplicação da intervenção comportamental e educativa por telefone. Utilizou-se um roteiro de intervenção segundo os preceitos da Entrevista Motivacional. ao comparar antes e depois das intervenções comportamental e educativa constatou-se que houve uma mudança estatisticamente significativa (p = 0,0283) no aumento do conhecimento das mulheres que participaram da intervenção educativa; não houve mudança comprovada na atitude das mulheres de nenhum dos grupos e houve um aumento da adesão ao exame colpocitológico nos dois grupos (p grupo comportamental (66,8%). as intervenções comportamentais e educativas por telefone foram eficazes na adesão das mulheres ao exame colpocitológico, representando estratégias importantes para educação permanente em saúde, promovendo a atenção para a prevenção do câncer cérvico-uterino. comprobar los efectos de intervención comportamental y educativa por teléfono en la adhesión de las mujeres, con

  8. Nuclear Installations Act 1969

    International Nuclear Information System (INIS)

    1969-01-01

    The purpose of this Act is to amend the Nuclear Installations Act 1965 to bring it into full compliance with the international conventions on nuclear third party liability to which the United Kingdom is a Signatory, namely, the Paris Convention, the Brussels Supplementary Convention and the Vienna Convention. (NEA) [fr

  9. High voltage electricity installations a planning perspective

    CERN Document Server

    Jay, Stephen Andrew

    2006-01-01

    The presence of high voltage power lines has provoked widespread concern for many years. High Voltage Electricity Installations presents an in-depth study of policy surrounding the planning of high voltage installations, discussing the manner in which they are percieved by the public, and the associated environmental issues. An analysis of these concerns, along with the geographical, environmental and political influences that shape their expression, is presented. Investigates local planning policy in an area of the energy sector that is of highly topical environmental and public concern Cover

  10. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meters and regulators: Installation. 192... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a...

  11. 49 CFR 192.359 - Customer meter installations: Operating pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meter installations: Operating pressure... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.359 Customer meter installations: Operating pressure...

  12. Drinking-water supply system of Arbedo-Castione. Replacement of the main water supply line and installation of a small hydropower plant; Sostituzione condotta adduzione sorgenti in valle d'Arbedo e ricupero energetico. Acquedotto di Arbedo-Castione

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2005-07-01

    This report presents the comparative evaluation of variants for the replacement work of the main drinking-water supply line from the Arbedo valley to the community of Arbedo-Castione, southern Switzerland. Three variants include the installation of a small hydropower plant to take advantage of the elevation difference of 340 m between the location of water collection and the water reservoir. The base case only includes the line replacement. The feasibility study includes both a technical and an economical analysis. The average water flow rate is estimated to 12 l/s. The nominal electrical power would be 25 kW. Power production cost is calculated to about 0.09 Swiss francs/kWh. The author concludes that an optimized variant with small hydropower plant would be the best solution, also from the point of view of environmental aspects.

  13. Using History to Teach Invention and Design: The Case of the Telephone

    Science.gov (United States)

    Gorman, Michael E.; Robinson, J. Kirby

    This paper shows how a historical case, the invention of the telephone, can be used to teach invention and design in a way that combines engineering, social sciences, and humanities. The historical problem of transmitting speech was turned into an active learning module, in which students sought to improve patents obtained by early telephone inventors like Alexander Graham Bell and Elisha Gray, using equipment similar to what was available at the time. The result was a collaborative learning environment in which students from a wide range of majors worked in teams, eventually producing a patent application. As part of the project, they were allowed to search historical materials like the Bell notebooks, which were made available on line. This experience gave them a better understanding of the invention and design process.

  14. The telephone effect: Overcoming initiation deficits in two settings.

    Science.gov (United States)

    Vickers, Kayci L; Keesler, Michael E; Williams, Kelli S; Charles, Jeremy Y; Hamilton, Roy H

    2018-04-19

    Disorders of motivation substantially impair an individual's ability to communicate with their families, therapists, and doctors. One method of overcoming initiation deficits is by utilizing the telephone effect, which is the ability for individuals with severe motivation deficits to communicate more readily when speaking on a telephone. However, little is available in the extant literature on how this effect works or how best to integrate this into patient care. This article aims to provide the first report of a proposed mechanism underlying the telephone effect and the first published procedures for eliciting this effect. This is largely a review article that also contains descriptions of clinical procedures for eliciting the telephone effect with 2 patient populations: acute inpatients following brain injury and dementia residents. A case vignette is also provided. We propose that the telephone effect is the result of an interaction between the patient and environment, and occurs because of Gibson's (1979) law of affordances. The use of this theory provides an explanation of the behaviors often observed when attempting to elicit this effect (i.e., disruption of the effect when using a cellular phone). Moreover, we argue that this can, and does, apply to social interactions as well. The telephone effect is an understudied phenomenon that provides a means of improving care for individuals with disorders of motivation. Future directions include systematic research into the telephone effect and further investigation of the mechanism underlying this effect. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  15. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  16. Entropy and Digital Installation

    Directory of Open Access Journals (Sweden)

    Susan Ballard

    2005-01-01

    Full Text Available This paper examines entropy as a process which introduces ideas of distributed materiality to digital installation. Beginning from an analysis of entropy as both force and probability measure within information theory and it’s extension in Ruldof Arnheim’s text ‘Entropy and Art” it develops an argument for the positive rather thannegative forces of entropy. The paper centres on a discussion of two recent works by New Zealand artists Ronnie van Hout (“On the Run”, Wellington City Gallery, NZ, 2004 and Alex Monteith (“Invisible Cities”, Physics Room Contemporary Art Space, Christchurch, NZ, 2004. Ballard suggests that entropy, rather than being a hindrance to understanding or a random chaotic force, discloses a necessary and material politics of noise present in digital installation.

  17. Installation Strategic Planning Guidebook

    Science.gov (United States)

    2012-05-01

    Installation natural resource concerns (for example, wetlands , number of endangered species, water use restrictions, encroachment on training lands...Koehler Publishing, 1994 7. Strategy Safari – A Guided Tour Through the Wilds of Strategic Management by Henry Mintzberg, Bruce Ahlstrand, and...T. (1987). NY: Knopf 36. Shaping Strategic Planning: Frogs, Dragons, Bees and Turkey Tails. Pfeiffer, J. W., Goodstein, L. D. & Nolan, T. M. (1989

  18. Installing the ALICE detector

    CERN Multimedia

    Maximilien Brice

    2006-01-01

    The huge iron yoke in the cavern at Point 2 in the LHC tunnel is prepared for the installation of the ALICE experiment. The yoke is being reused from the previous L3 experiment that was located at the same point during the LEP project from 1989 to 2000. ALICE will be inserted piece by piece into the cradle where it will be used to study collisions between two beams of lead ions.

  19. SNRIU nuclear installation modifications

    International Nuclear Information System (INIS)

    Goroshanskyi, Andrii

    2013-01-01

    Design stages of Nuclear Instalations (NI): NI design is performed in three stages: • Feasibility study: - Feasibility study is developed on the basis of the customer task for production facilities and linear facilities engineering and transport infrastructure that require detailed study of relevant decisions and identify options for and feasibility of construction. • Design: - The design is developed on the basis of design task, initial data and approved the previous stage under three-stage design. • Detailed documentation

  20. Safety of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    In accordance with the Nuclear Energy Act, a Licence may only be issued if the precautions required by the state of the art have been taken to prevent damage resulting from the construction and operation of the installation. The maximum admissible body doses in the area around the installation which must be observed in planning constructional and other technical protective measures to counter accidents in or at a nuclear power station (accident planning values, are established). According to the Radiological Protection Ordinance the Licensing Authority can consider these precautions to have been taken if, in designing the installation against accidents, the applicant has assumed the accidents which, according to the Safety Criteria and Guidelines for Nuclear Power Stations published in the Federal Register by the Federal Minister of the Interior after hearing the competent senior state authorities, must determine the design of a nuclear power station. On the basis of previous experience from safety analysis, assessment and operation of nuclear power stations, the accident guidelines published here define which accidents are determinative for the safety-related design of PWR power stations and what verification -particularly with regard to compliance with the accident planning values of the Radiological Protection Ordinance -must be provided by the applicant. (author)

  1. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  2. Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to the book “Guidelines for Building a Private Cloud Infrastructure”. This document provides guidance on how to install Ubuntu Enterprise Cloud in virtual environment, and afterwards how to scale out when needed. The purpose of this supplemental book...... is to provide a practical, step-by-step, detailed guide on how to dimension and install the machines and network. Some initial steps of configuring the cloud are also covered. The installation is performed in a virtual environment based on Windows 7 and VMware Workstation 7. The cloud installation is performed...... cloud, both using the command line tools, and GUI based tool HybridFox....

  3. Systems configured to distribute a telephone call, communication systems, communication methods and methods of routing a telephone call to a service representative

    Science.gov (United States)

    Harris, Scott H.; Johnson, Joel A.; Neiswanger, Jeffery R.; Twitchell, Kevin E.

    2004-03-09

    The present invention includes systems configured to distribute a telephone call, communication systems, communication methods and methods of routing a telephone call to a customer service representative. In one embodiment of the invention, a system configured to distribute a telephone call within a network includes a distributor adapted to connect with a telephone system, the distributor being configured to connect a telephone call using the telephone system and output the telephone call and associated data of the telephone call; and a plurality of customer service representative terminals connected with the distributor and a selected customer service representative terminal being configured to receive the telephone call and the associated data, the distributor and the selected customer service representative terminal being configured to synchronize, application of the telephone call and associated data from the distributor to the selected customer service representative terminal.

  4. When may doctors give nurses telephonic treatment instructions?

    African Journals Online (AJOL)

    When is it legal for doctors to give nurses telephonic treatment instructions? ... telemedicine? Telemedicine is defined as 'the practice of medicine, from a distance, ... [6] Therefore, if in such circumstances the doctors cannot reach the patients in ...

  5. Is there a bias against telephone interviews in qualitative research?

    Science.gov (United States)

    Novick, Gina

    2008-08-01

    Telephone interviews are largely neglected in the qualitative research literature and, when discussed, they are often depicted as a less attractive alternative to face-to-face interviewing. The absence of visual cues via telephone is thought to result in loss of contextual and nonverbal data and to compromise rapport, probing, and interpretation of responses. Yet, telephones may allow respondents to feel relaxed and able to disclose sensitive information, and evidence is lacking that they produce lower quality data. This apparent bias against telephone interviews contrasts with a growing interest in electronic qualitative interviews. Research is needed comparing these modalities, and examining their impact on data quality and their use for studying varying topics and populations. Such studies could contribute evidence-based guidelines for optimizing interview data. 2008 Wiley Periodicals, Inc

  6. Towards effective telephone-based delivery of government services

    CSIR Research Space (South Africa)

    Barnard, E

    2003-09-01

    Full Text Available Government regulations have combined with a tremendous growth in prepaid cellular telephony to bring telephone connectivity to an unprecedented number of South African citizens – thus creating an ideal platform for delivering services to a wide...

  7. Can Smartphones Enhance Telephone-Based Cognitive Assessment (TBCA)?

    OpenAIRE

    Rick Yiu-Cho Kwan; Claudia Kam-Yuk Lai

    2013-01-01

    TBCA has emerged to solve the limitations of administering cognitive assessments face-to-face. The recent development of telephones and knowledge advances in the area of cognitive impairment may affect the development of TBCA. The purpose of this paper is to discuss how smartphones can be used to enhance the applicability of TBCA, which has previously been administered by conventional telephone. This paper will first review, describe and critique the existing TBCA instruments. It will then di...

  8. Cellular telephone use among primary school children in Germany

    International Nuclear Information System (INIS)

    Boehler, Eva; Schuez, Joachim

    2004-01-01

    Background: There is some concern about potential health risks of cellular telephone use to children. We assessed data on how many children own a cellular telephone and on how often they use it in a population-based sample. Methods: We carried out a cross-sectional study among children in their fourth elementary school year, with a median-age of 10 years. The study was carried out in Mainz (Germany), a city with about 200,000 inhabitants. The study base comprised all 37 primary schools in Mainz and near surroundings. Altogether, 1933 children from 34 primary schools took part in the survey (participation rate of 87.8%). Results: Roughly a third of all children (n = 671, 34.7%) reported to own a cellular telephone. Overall, 119 (6.2%) children used a cellular telephone for making calls at least once a day, 123 (6.4%) used it several times a week and 876 (45.3%) children used it only once in a while. The remaining 805 (41.6%) children had never used a cellular telephone. The probability of owning a cellular telephone among children was associated with older age, being male, having no siblings, giving full particulars to height and weight, more time spent watching TV and playing computer games, being picked up by their parents from school by car (instead of walking or cycling) and going to bed late. The proportion of cellular telephone owners was somewhat higher in classes with more children from socially disadvantaged families. Conclusions: Our study shows that both ownership of a cellular telephone as well as the regular use of it are already quite frequent among children in the fourth grade of primary school. With regard to potential long-term effects, we recommend follow-up studies with children

  9. Bundling the value of discharge telephone calls and leader rounding.

    Science.gov (United States)

    Setia, Nina; Meade, Christine

    2009-03-01

    Discharge telephone calls made by hospital staff provide invaluable opportunities to prevent adverse events, improve quality of care, and increase patient satisfaction. Similarly, the effect of rounding on patients can improve clinical quality and improve both patient and staff satisfaction. The author discusses how the combination of implementing both nurse leader rounding and discharge telephone calls simultaneously produced powerful positive outcomes in satisfaction and patient quality of care.

  10. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  11. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Keller, W.

    1976-01-01

    A nuclear reactor installation includes a pressurized-water coolant reactor vessel and a concrete biological shield surrounding this vessel. The shield forms a space between it and the vessel large enough to permit rapid escape of the pressurized-water coolant therefrom in the event the vessel ruptures. Struts extend radially between the vessel and shield for a distance permitting normal radial thermal movement of the vessel, while containing the vessel in the event it ruptures, the struts being interspaced from each other to permit rapid escape of the pressurized-water coolant from the space between the shield and the vessel

  12. Decommissioning nuclear installations

    International Nuclear Information System (INIS)

    Dadoumont, J.

    2010-01-01

    When a nuclear installation is permanently shut down, it is crucial to completely dismantle and decontaminate it on account of radiological safety. The expertise that SCK-CEN has built up in the decommissioning operation of its own BR3 reactor is now available nationally and internationally. Last year SCK-CEN played an important role in the newly started dismantling and decontamination of the MOX plant (Mixed Oxide) of Belgonucleaire in Dessel, and the decommissioning of the university research reactor Thetis in Ghent.

  13. Fires of sodium installations

    International Nuclear Information System (INIS)

    Hajek, L.; Tlalka, R.

    1984-01-01

    A survey is presented of the literature dealing with fires of sodium installations between 1974 and 1981. Also described are three experimental fires of ca 50 kg of sodium in an open area, monitored by UJV Rez. The experimental conditions of the experiments are described and a phenomenological description is presented of the course of the fires. The experiments showed a relationship between wind velocity in the area surrounding the fire and surface temperature of the sodium flame. Systems analysis methods were applied to sodium area, spray and tube fires. (author)

  14. Worldwide installed geothermal power

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    Worldwide electric energy production data are easy to compile, according to the informations given by individual countries. On the contrary, thermal applications of geothermics are difficult to quantify due to the variety of applications and the number of countries concerned. Exhaustive informations sometimes cannot be obtained from huge countries (China, Russia..) because of data centralization problems or not exploitable data transmission. Therefore, installed power data for geothermal heat production are given for 26 countries over the 57 that have answered the International Geothermal Association questionnaire. (J.S.). 1 fig., 2 tabs., 1 photo

  15. Wireless installation standard

    International Nuclear Information System (INIS)

    Lim, Hwang Bin

    2007-12-01

    This is divided six parts which are radio regulation law on securing of radio resource, use of radio resource, protection of radio resource, radio regulation enforcement ordinance with securing, distribution and assignment of radio regulation, radio regulation enforcement regulation on utility of radio resource and technical qualification examination, a wireless installation regulation of technique standard and safety facility standard, radio regulation such as certification regulation of information communicative machines and regulation of radio station on compliance of signal security, radio equipment in radio station, standard frequency station and emergency communication.

  16. Nuclear installations sites safety

    International Nuclear Information System (INIS)

    Barber, P.; Candes, P.; Duclos, P.; Doumenc, A.; Faure, J.; Hugon, J.; Mohammadioun, B.

    1988-11-01

    This report is divided into ten parts bearing: 1 Safety analysis procedures for Basis Nuclear Installations sites (BNI) in France 2 Site safety for BNI in France 3 Industrial and transport activities risks for BNI in France 4 Demographic characteristics near BNI sites in France 5 Meteorologic characteristics of BNI sites in France 6 Geological aspects near the BNI sites in France 7 Seismic studies for BNI sites in France 8 Hydrogeological aspects near BNI sites in France 9 Hydrological aspects near BNI sites in France 10 Ecological and radioecological studies of BNI sites in France [fr

  17. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  18. Effects of Using Licensed Practical Nurses to Assist with Telephone Consultation Management

    National Research Council Canada - National Science Library

    Wiley, Jennifer L

    2006-01-01

    .... The study compared means of pre- and post-implementation provider overall job satisfaction, provider satisfaction with the telephone consult process, average daily hours providers spent on telephone...

  19. CNGS Reflector installed

    CERN Multimedia

    2006-01-01

    A major component that will help target the CNGS neutrino beam for its 732km journey through the earth's crust, from CERN to the Gran Sasso laboratory in Italy, has been installed in its final position. The transport of the huge magnetic horn reflector through the CNGS access gallery. A team from CNGS and TS/IC, and the contractors DBS, transported the magnetic horn reflector on 5th December, in a carefully conducted operation that took just under two hours. The reflector is 7m long, 1.6m in diameter and 1.6 tonnes in weight. With only a matter of centimetres to spare on either side, the reflector was transported through the CNGS access gallery, before being installed in the experiment's target chamber. The larger of two magnetic horns, the reflector will help refocus sprays of high energy pions and kaons emitted after a 0.5MW stream of protons from the Super Proton Synchrotron (SPS) strikes nucleons in a graphite target. The horns are toroidal magnetic lenses and work with high pulsed currents: 150 kA f...

  20. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  1. Radiations FR of telephone antennas and Public health: the state of the art

    International Nuclear Information System (INIS)

    Ubeda Maeso, A.; Trillo Ruiz, M. A.

    1999-01-01

    Today, mobile telephone is envisioned as one of the most significant innovations in communication. The growing development of this system asks for increasing amounts of antennas, installed in base transceiver stations (BTS) connection mobile stations (MS, hand held phones) to each other and to the conventional telephone network. Depending on the area, antennas are generally mounted in BTS located either on the top of buildings (in urban areas) or in towers (in rural or less populated areas). In both of the cases, the visual impact of BTS is significant for people living or working close to them. This visual evidence, together with some information, usually inconsistent or incomplete, released in media other than the scientific literature, have generated increasing feelings of phobia to alleged detrimental consequences of the uncontrolled exposure to radio waves emitted by the antennas. Such feelings, identified previously in countries where mobile telephony has been used for years in a regular basis, are now significantly growing in Spain and motivate many of the questions asked to information services of public agencies and institutions. The aim of the present article is to address some of the most frequently asked questions on the topic and to review the state of the art of our knowledge on the putative effects of the exposure to the electromagnetic radiation emitted by the aerials. Also, elementary notions are provided on the functioning of mobile telephony that may help the reader to better understand some technical aspects concerning the topic. (Author) 54 refs

  2. Telephone Crisis Support Workers' Psychological Distress and Impairment.

    Science.gov (United States)

    Kitchingman, Taneile A; Wilson, Coralie J; Caputi, Peter; Wilson, Ian; Woodward, Alan

    2018-01-01

    In order to respond to crises with appropriate intervention, crisis workers are required to manage their own needs as well as the needs of those they respond to. A systematic review of the literature was conducted to examine whether telephone crisis support workers experience elevated symptoms of psychological distress and are impaired by elevated symptoms. Studies were identified in April 2015 by searching three databases, conducting a gray literature search, and forward and backward citation chaining. Of 113 identified studies, seven were included in the review. Results suggest that that telephone crisis support workers experience symptoms of vicarious traumatization, stress, burnout, and psychiatric disorders, and that they may not respond optimally to callers when experiencing elevated symptoms of distress. However, definitive conclusions cannot be drawn due to the paucity and methodological limitations of available data. While the most comprehensive search strategy possible was adopted, resource constraints meant that conference abstracts were not searched and authors were not contacted for additional unpublished information. There is an urgent need to identify the impact of telephone crisis support workers' role on their well-being, the determinants of worker well-being in the telephone crisis support context, and the extent to which well-being impacts their performance and caller outcomes. This will help inform strategies to optimize telephone crisis support workers' well-being and their delivery of support to callers.

  3. Can smartphones enhance telephone-based cognitive assessment (TBCA)?

    Science.gov (United States)

    Kwan, Rick Yiu-Cho; Lai, Claudia Kam-Yuk

    2013-12-12

    TBCA has emerged to solve the limitations of administering cognitive assessments face-to-face. The recent development of telephones and knowledge advances in the area of cognitive impairment may affect the development of TBCA. The purpose of this paper is to discuss how smartphones can be used to enhance the applicability of TBCA, which has previously been administered by conventional telephone. This paper will first review, describe and critique the existing TBCA instruments. It will then discuss the recent developments in tele-technology, the popularity of tele-technology among the elderly, potential benefits and challenges in using smartphones for cognitive assessment, and possible future developments in this technology. In the systematic review, eighteen TBCA instruments were identified. They were found to be valid in differentiating between people with and without dementia. TBCA was previously found to be launched on a conventional telephone platform. The advances in understanding of cognitive impairment may demand that telephones be equipped with more advanced features. Recently, the development and penetration of smartphones among the elderly has been rapid. This may allow the smartphone to enhance its TBCA applicability by overcoming the limitations of the conventional telephone, rendering the TBCA more efficient in addressing the increasing demand and complexity of cognitive assessments in the future. However, more research and technology developments are needed before smartphones can become a valid platform for TBCA.

  4. Can Smartphones Enhance Telephone-Based Cognitive Assessment (TBCA?

    Directory of Open Access Journals (Sweden)

    Rick Yiu-Cho Kwan

    2013-12-01

    Full Text Available TBCA has emerged to solve the limitations of administering cognitive assessments face-to-face. The recent development of telephones and knowledge advances in the area of cognitive impairment may affect the development of TBCA. The purpose of this paper is to discuss how smartphones can be used to enhance the applicability of TBCA, which has previously been administered by conventional telephone. This paper will first review, describe and critique the existing TBCA instruments. It will then discuss the recent developments in tele-technology, the popularity of tele-technology among the elderly, potential benefits and challenges in using smartphones for cognitive assessment, and possible future developments in this technology. In the systematic review, eighteen TBCA instruments were identified. They were found to be valid in differentiating between people with and without dementia. TBCA was previously found to be launched on a conventional telephone platform. The advances in understanding of cognitive impairment may demand that telephones be equipped with more advanced features. Recently, the development and penetration of smartphones among the elderly has been rapid. This may allow the smartphone to enhance its TBCA applicability by overcoming the limitations of the conventional telephone, rendering the TBCA more efficient in addressing the increasing demand and complexity of cognitive assessments in the future. However, more research and technology developments are needed before smartphones can become a valid platform for TBCA.

  5. Installations having pressurised fluid circuits

    International Nuclear Information System (INIS)

    Rigg, S.; Grant, J.

    1977-01-01

    Reference is made to nuclear installations having pressurised coolant flow circuits. Breaches in such circuits may quickly result in much damage to the plant. Devices such as non-return valves, orifice plates, and automatically operated shut-off valves have been provided to prevent or reduce fluid flow through a breached pipe line, but such devices have several disadvantages; they may present large restrictions to normal flow of coolant, and may depend on the operation of ancillary equipment, with consequent delay in bringing them into operation in an emergency. Other expedients that have been adopted to prevent or reduce reverse flow through an upstream breach comprise various forms of hydraulic counter flow brakes. The arrangement described has at least one variable fluid brake comprising a fluidic device connected into a duct in the pressurised circuit, the device having an inlet, an outlet, a vortex chamber between the inlet and outlet, a control jet for introducing fluid into the vortex chamber, connections communicating the inlet and the outlet into one part of the circuit and the control jet into another region at a complementary pressure so that, in the event of a breach in the circuit in one region, fluid passes from the other region to enter the vortex chamber to stimulate pressure to create a flow restricting vortex in the chamber that reduces flow through the breach. The system finds particular application to stream generating pressure tube reactors, such as the steam generating heavy water reactor at UKAEA, Winfrith. (U.K.)

  6. Telephone based weight loss intervention: Relevance for developing countries.

    Science.gov (United States)

    Ayisi Addo, Sandra; Steiner-Asiedu, Matilda

    2018-02-08

    Obesity is a major public health challenge not only for developed but developing countries as well. The World Health Organization recommends the immediate use of effective, efficient and widely accessible weight loss interventions. Telephone based weight loss intervention could provide a cheaper and wider reach of obese participants. Previous systematic reviews on telephone based weight loss interventions either excluded studies that had obese participants with co-morbidities or were silent on their inclusion. Obese/overweight individuals with co-morbidities constitute an important population in any weight loss intervention study due to the strong association of obesity with major chronic health conditions. This paper, reviews the efficacy of telephone based weight loss intervention solely in overweight/obese individuals with obesity related diseases and discusses its relevance for developing countries.

  7. Cordless telephone use: implications for mobile phone research.

    Science.gov (United States)

    Redmayne, Mary; Inyang, Imo; Dimitriadis, Christina; Benke, Geza; Abramson, Michael J

    2010-04-01

    Cordless and mobile (cellular) telephone use has increased substantially in recent years causing concerns about possible health effects. This has led to much epidemiological research, but the usual focus is on mobile telephone radiofrequency (RF) exposure only despite cordless RF being very similar. Access to and use of cordless phones were included in the Mobile Radiofrequency Phone Exposed Users Study (MoRPhEUS) of 317 Year 7 students recruited from Melbourne, Australia. Participants completed an exposure questionnaire-87% had a cordless phone at home and 77% owned a mobile phone. There was a statistically significant positive relationship (r = 0.38, p < 0.01) between cordless and mobile phone use. Taken together, this increases total RF exposure and its ratio in high-to-low mobile users. Therefore, the design and analysis of future epidemiological telecommunication studies need to assess cordless phone exposure to accurately evaluate total RF telephone exposure effects.

  8. Validation of a telephone screening test for Alzheimer's disease.

    Science.gov (United States)

    Camozzato, Ana Luiza; Kochhann, Renata; Godinho, Claudia; Costa, Amanda; Chaves, Marcia L

    2011-03-01

    Financial constraints, mobility issues, medical conditions, crime in local areas can make cognitive assessment difficult for elders and telephone interviews can be a good alternative. This study was carried out to evaluate the reliability, validity and clinical utility of a Brazilian telephone version of the Mini Mental State Examination (Braztel-MMSE) in a community sample of healthy elderly participants and AD patients. The MMSE and the Braztel-MMSE were applied to 66 AD patients and 67 healthy elderly participants. The test-retest reliability was strong and significant (r = .92, p = .01), and the correlation between the Braztel-MMSE and the MMSE were significant (p = .01) and strong (r = .92). The general screening ability of the Braztel-MMSE was high (AUC = 0.982; CI95% = 0.964-1.001). This telephone version can therefore be used as a screening measure for dementia in older adults that need neuropsychological screening and cannot present for an evaluation.

  9. Maintenance of the telephone exchange in building 40

    CERN Multimedia

    2006-01-01

    In order to secure the power supply of the telephone exchange in building 40, a maintenance will be done on the 18th of December from 7.30 am to 8 am. During this intervention, the fixed telephony services in building 39 and 40 will be interrupted. The fixed telephony services in other CERN buildings won't be affected by this maintenance. The mobile telephony services (GSM) won't be affected. For more details, please send your questions to Standard.Telephone@cern.ch Telecom Services IT/CS

  10. SAF line powder operations

    International Nuclear Information System (INIS)

    Frederickson, J.R.; Horgos, R.M.

    1983-10-01

    An automated nuclear fuel fabrication line is being designed for installation in the Fuels and Materials Examination Facility (FMEF) near Richland, Washington. The fabrication line will consist of seven major process systems: Receiving and Powder Preparation; Powder Conditioning; Pressing and Boat Loading; Debinding, Sintering, and Property Adjustment; Boat Transport; Pellet Inspection and Finishing; and Pin Operations. Fuel powder processing through pellet pressing will be discussed in this paper

  11. Tumour risk associated with use of cellular telephones or cordless desktop telephones

    Directory of Open Access Journals (Sweden)

    Söderqvist Fredrik

    2006-10-01

    Full Text Available Abstract Background The use of cellular and cordless telephones has increased dramatically during the last decade. There is concern of health problems such as malignant diseases due to microwave exposure during the use of these devices. The brain is the main target organ. Methods Since the second part of the 1990's we have performed six case-control studies on this topic encompassing use of both cellular and cordless phones as well as other exposures. Three of the studies concerned brain tumours, one salivary gland tumours, one non-Hodgkin lymphoma (NHL and one testicular cancer. Exposure was assessed by self-administered questionnaires. Results Regarding acoustic neuroma analogue cellular phones yielded odds ratio (OR = 2.9, 95 % confidence interval (CI = 2.0–4.3, digital cellular phones OR = 1.5, 95 % CI = 1.1–2.1 and cordless phones OR = 1.5, 95 % CI = 1.04–2.0. The corresponding results were for astrocytoma grade III-IV OR = 1.7, 95 % CI = 1.3–2.3; OR = 1.5, 95 % CI = 1.2–1.9 and OR = 1.5, 95 % CI = 1.1–1.9, respectively. The ORs increased with latency period with highest estimates using > 10 years time period from first use of these phone types. Lower ORs were calculated for astrocytoma grade I-II. No association was found with salivary gland tumours, NHL or testicular cancer although an association with NHL of T-cell type could not be ruled out. Conclusion We found for all studied phone types an increased risk for brain tumours, mainly acoustic neuroma and malignant brain tumours. OR increased with latency period, especially for astrocytoma grade III-IV. No consistent pattern of an increased risk was found for salivary gland tumours, NHL, or testicular cancer.

  12. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Jungmann, A.

    1976-01-01

    A nuclear reactor metal pressure vessel is surrounded by a concrete wall forming an annular space around the vessel. Thermal insulation is in this space and surrounds the vessel, and a coolant-conductive layer is also in this space surrounding the thermal insulation, coolant forced through this layer reducing the thermal stress on the concrete wall. The coolant-conductive layer is formed by concrete blocks laid together and having coolant passages, these blocks being small enough individually to permit them to be cast from concrete at the reactor installation, the thermal insulation being formed by much larger sheet-metal clad concrete segments. Mortar is injected between the interfaces of the coolant-conductive layer and concrete wall and the interfaces between the fluid-conductive layer and the insulation, a layer of slippery sheet material being interposed between the insulation and the mortar. When the pressure vessel is thermally expanded by reactor operation, the annular space between it and the concrete wall is completely filled by these components so that zero-excursion rupture safeguard is provided for the vessel. 4 claims, 1 figure

  13. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  14. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  15. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  16. Buffer protection in the installation phase

    International Nuclear Information System (INIS)

    Wimelius, Hans; Pusch, Roland

    2008-12-01

    The research and development of the design and construction of the SKB's repository for final disposal of spent reactor fuel is conducted along several paths ('lines'). Issues concerning the bedrock are dealt with in the 'rock line' and those related to buffer and backfill in deposition holes and tunnels are considered in the 'buffer line' and 'backfill line', respectively. These lines also deal with sub-activities that are coupled to several other lines. One of them includes development of techniques for protecting buffer blocks from moisture and water in the installation phase. Techniques and methods for placement and removal of the 'buffer protection sheet' are dealt with in the 'buffer line'. The removal is, however, considered as being part of the backfilling sequence. Since the performance of the sheet is of fundamental importance to the placement and function of the buffer it deserves particular attention. Thus, the removal of the rubber sheet that serves to protect the buffer blocks in the installation phase may be difficult and can cause significant problems that may require retrieval of already placed canister, buffer and backfill. These matters are in focus in the present report. Arrangements for protecting already placed buffer blocks from moist air and water have been tested in earlier large-scale experiments, i.e. the Prototype Repository project at Aespoe but the experience from them has called for more effective protection of the clay blocks as described in the present report. Focus is on the construction of foundation components at the bottom of the deposition holes required for establishing a tight seal between rock and buffer blocks, and on the protection sheet and arrangements for limiting water pressure on it. Special attention is paid to the drainage of the space between rock and protection sheet that is necessary for avoiding failure of the sheet and to systems for achieving this and for providing alarm signals if the allowed pressure is

  17. Buffer protection in the installation phase

    Energy Technology Data Exchange (ETDEWEB)

    Wimelius, Hans (Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)); Pusch, Roland (Geodevelopment International AB, Lund (Sweden))

    2008-12-15

    The research and development of the design and construction of the SKB's repository for final disposal of spent reactor fuel is conducted along several paths ('lines'). Issues concerning the bedrock are dealt with in the 'rock line' and those related to buffer and backfill in deposition holes and tunnels are considered in the 'buffer line' and 'backfill line', respectively. These lines also deal with sub-activities that are coupled to several other lines. One of them includes development of techniques for protecting buffer blocks from moisture and water in the installation phase. Techniques and methods for placement and removal of the 'buffer protection sheet' are dealt with in the 'buffer line'. The removal is, however, considered as being part of the backfilling sequence. Since the performance of the sheet is of fundamental importance to the placement and function of the buffer it deserves particular attention. Thus, the removal of the rubber sheet that serves to protect the buffer blocks in the installation phase may be difficult and can cause significant problems that may require retrieval of already placed canister, buffer and backfill. These matters are in focus in the present report. Arrangements for protecting already placed buffer blocks from moist air and water have been tested in earlier large-scale experiments, i.e. the Prototype Repository project at Aespoe but the experience from them has called for more effective protection of the clay blocks as described in the present report. Focus is on the construction of foundation components at the bottom of the deposition holes required for establishing a tight seal between rock and buffer blocks, and on the protection sheet and arrangements for limiting water pressure on it. Special attention is paid to the drainage of the space between rock and protection sheet that is necessary for avoiding failure of the sheet and to systems for achieving

  18. Automated eddy-current installation AVD-01 for detecting flaws in fuel element cans

    International Nuclear Information System (INIS)

    Varvaritsa, V.P.; Martishchenko, L.G.; Popov, V.K.; Romanov, M.L.; Shlepnev, I.O.; Shmatok, V.P.

    1986-01-01

    This paper describes an automated installation for eddy-current flaw detection in thin-walled pipes with small diameter; its unified transport system makes it possible to use the installation in inspection lines and production lines of fuel elements. The article describes the structural diagrams of the installation and presents the results of investigations connected with the selection for establishing the optimum regimes and sensitivity of feedthrough transducers with focusing screens

  19. 28 CFR 540.103 - Inmate telephone calls to attorneys.

    Science.gov (United States)

    2010-07-01

    ... attorneys when the inmate demonstrates that communication with attorneys by correspondence, visiting, or... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Inmate telephone calls to attorneys. 540.103 Section 540.103 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL...

  20. Telephone versus usual care in management of acute whiplash ...

    African Journals Online (AJOL)

    Whiplash associated disorder (WAD) is a common and costly condition, and recommended management includes advice to “act as usual” and exercise. Providing this treatment through a telephonic intervention may help to improve access to care, and reduce costs. This pilot study assessed: (1) the effectiveness of a ...

  1. 77 FR 34233 - Telephone Consumer Protection Act of 1991

    Science.gov (United States)

    2012-06-11

    ... initiator of the message, to be a nuisance and an invasion of privacy; and (3) individuals' privacy rights... are made by the consumer's loan servicer, because the primary motivation of the calling party is to... challenged as TCPA violations because the primary motivation appears to be sending a telephone solicitation...

  2. AIDS and condoms in Brasilia: a telephone survey.

    Science.gov (United States)

    Chequer, P; VanOss Marín, B; Paiva, L; Hudes, E S; Piazza, T; Rodrigues, L; Hearst, N

    1997-10-01

    A telephone survey was conducted to measure AIDS knowledge, media usage and condom attitudes and behaviors among 500 adults aged 18 to 49 in Brasilia, as well as to evaluate the feasibility of the telephone survey method in a developing country. The response rate was 91.6%. Respondents had good knowledge about correct modes of HIV transmission and prevention but also believed HIV was transmitted through blood donation, public toilets, swimming pools, and mosquito bites. TV and newspapers were the most important sources of information on health matters and AIDS, though health workers were considered the most credible sources of such information. Only 19% of sexual encounters in the 4 weeks prior to the survey included condoms. Single and younger respondents and those with more positive attitudes used condoms more frequently. More work is needed to identify appropriate messages to motivate people to use condoms. Telephone surveys regarding AIDS and sexual attitudes and behaviors are feasible in Brasilia, a planned community with universal telephone coverage.

  3. 47 CFR 64.1505 - Restrictions on collect telephone calls.

    Science.gov (United States)

    2010-10-01

    ... SERVICES (CONTINUED) MISCELLANEOUS RULES RELATING TO COMMON CARRIERS Interstate Pay-Per-Call and Other Information Services § 64.1505 Restrictions on collect telephone calls. (a) No common carrier shall provide interstate transmission or billing and collection services to an entity offering any service within the scope...

  4. 77 FR 66935 - Telephone Consumer Protection Act of 1991

    Science.gov (United States)

    2012-11-08

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 02-278; FCC 12-21] Telephone Consumer Protection Act of 1991 AGENCY: Federal Communications Commission. ACTION: Final rule; correction...: Karen Johnson, Consumer and Governmental Affairs Bureau, Consumer Policy Division, at (202) 418- 7706 or...

  5. Applicability of structured telephone monitoring to follow up heart ...

    African Journals Online (AJOL)

    Over 90% of the contacted patients gave valuable information regarding their clinical status. Conclusion: Majority of HF patients can be contacted and provide valuable clinical information through mobile phones within a month post discharge from the national hospital in Tanzania. Structured telephone monitoring could be ...

  6. Applicability of structured telephone monitoring to follow up heart ...

    African Journals Online (AJOL)

    Pilly Chillo

    Keywords: heart failure, structured telephone, home monitoring, Tanzania ... in a parallel increase in HF admissions and a major impact on health care systems. ... was entered in Statistical Package for Social Sciences (SPSS) version 20 software for analysis. ..... Failure (DIAL): study design and preliminary observations.

  7. Willingness to Pay for Rural Telephone Services: Implications for ...

    African Journals Online (AJOL)

    Global Approaches to Extension Practice: A Journal of Agricultural Extension ... This study assessed Willingness to Pay (WTP) for rural telephone services and the implications for agricultural technology transfer in Southeast Nigeria. ... The sample was made up of 240 agro-based entrepreneurs and 60 extension staff.

  8. Short Term Group Counseling of Visually Impaired People by Telephone.

    Science.gov (United States)

    Jaureguy, Beth M.; Evans, Ron L.

    1983-01-01

    Short term group counseling via the telephone resulted in marked increases in activities of daily living among 12 legally blind veterans. Many subjects' personal coping goals were met as well, and social involvement also increased. No significant changes in levels of depression or agitation were noted. (CL)

  9. An enquiry into the prospects of mobile telephone for agricultural ...

    African Journals Online (AJOL)

    LPhidza

    KEYWORDS: Mobile phones, agricultural information, global system for mobile ... rural services (i.e. agricultural extension) more efficient and cost-effective. 2. ... adoption of mobile telephones, evaluation research has however .... Distribution of respondents by religion. Religion. Frequencies Percentages. Christian. Islam.

  10. Telephone Care Management of Fall Risk:: A Feasibility Study.

    Science.gov (United States)

    Phelan, Elizabeth A; Pence, Maureen; Williams, Barbara; MacCornack, Frederick A

    2017-03-01

    Care management has been found to be more effective than usual care for some chronic conditions, but few studies have tested care management for prevention of elder falls. This study aimed to assess the feasibility and preliminary efficacy of telephone care management of older adults presenting for medical attention due to a fall. The setting was an independent practice association in western Washington serving 1,300 Medicare Advantage-insured patients. Patients aged ≥65 years treated for a fall in an emergency department or their primary care provider's office were contacted via telephone by a care manager within 48 hours of their fall-related visit and invited to participate in a telephone-administered interview to identify modifiable fall risk factors and receive recommendations and follow-up to address identified risk factors. Data from care manager records, patient medical records, and healthcare claims for the first 6 months (November 2009-April 2010) of program implementation were analyzed in 2011. The feasibility of screening and management of fall risk factors over the telephone and the effect on medically attended falls were assessed. Twenty-two patients eligible for fall care management were reached and administered the protocol. Administration took 15-20 minutes and integrated easily with the care manager's other responsibilities. Follow-through on recommendations varied, from 45% for those for whom exercise participation was recommended to 100% for other recommendations. No medically attended falls occurred over 6 months of follow-up. Telephone care management of fall risk appears feasible and may reduce falls requiring medical attention. Copyright © 2016 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  11. Emergency telephone consultations: a new course for medical students.

    Science.gov (United States)

    Schaufelberger, Mireille; Harris, Michael; Frey, Peter

    2012-12-01

    Using the telephone for consultations is now common practice. Although there is a clear need for specific training for telephone consultations, it is uncommon for it to be taught in medical school. A practical course on emergency telephone consultations (ECTs) was designed for the medical degree course at the University of Bern Medical School. During the module, each of the volunteer fifth-year medical students had to perform two simulated telephone consultations. Medical students in their first year of medical school acted as simulated patients (SPs), and they gave immediate feedback to the participants. Nineteen per cent of fifth-year students voluntarily undertook the ETC course. The course was rated 'very informative' by 68 per cent of the participants, and 'informative' by 32 per cent. Ninety-four per cent of the attendees recorded a personal learning gain, and 68 per cent suggested that the course should be obligatory. All the participants thought that the SPs played their roles realistically. In their rating of the ETC, the fifth-year students gave it a mean mark of 5.5 (out of a maximum of 6), suggesting that they thought it had been very successful. Students became aware of their need for ETC training through the course itself, and they recommended that it should be obligatory. The ETC pilot received a highly positive response from lead clinicians who anticipated a rising number of telephone consultations, and who have to deal with trainees who have not been taught about how to deal with ETCs. As a result, the Faculty of Medicine decided to make the course obligatory. © Blackwell Publishing Ltd 2012.

  12. GYNOTEL: telephone advice to gynaecological surgical patients after discharge.

    Science.gov (United States)

    Caljouw, Monique A A; Hogendorf-Burgers, Marja E H J

    2010-12-01

    To investigate in surgical gynaecological patients the types of health problems arising or persisting up to six weeks after discharge and the effectiveness of telephone advice. The decreasing length of hospital stay has increased the need for specific instructions about the postdischarge period. Telephone advice could be a valuable tool to address this problem. To our knowledge, postdischarge health problems and the value of telephone advice have not been investigated among gynaecological patients. Randomised controlled trial. Gynaecological patients expected to stay in the ward longer than 24 hour were invited to participate. A pilot study showed that wound healing, pain, mobility, urination, defecation and vaginal bleeding were the most common health problems postdischarge. Based on that information, guidelines were formulated that were used by trained nurses to give telephone advice to the intervention group (n=235), in addition to the usual care. The control group of gynaecological patients (n=233) received usual care only. Of all 468 participants, about 50% were operated for general gynaecology. At discharge, wound pain (56%), mobility problems (54%) and constipation (27%) were the most frequently mentioned problems in both groups. Participants who completely followed the advice with regard to wound healing (p=0.02), pain (p=0.01), vaginal bleeding (p=0.03) and mobility (p=0.04) experienced greater improvement than participants who did not follow, or only partly followed, the advice. The telephone advice appears to make a significant contribution to help gynaecological surgical patients to solve or reduce their postdischarge health problems. The positive effect of such advice can be interpreted as an improvement in the quality of life of the postoperative gynaecological patient. © 2010 Blackwell Publishing Ltd.

  13. The insurance of nuclear installations

    International Nuclear Information System (INIS)

    Francis, H.W.

    1977-01-01

    A brief account is given of the development of nuclear insurance. The subject is dealt with under the following headings: the need for nuclear insurance, nuclear insurance pools, international co-operation, nuclear installations which may be insured, international conventions relating to the liability of operators of nuclear installations, classes of nuclear insurance, nuclear reactor hazards and their assessment, future developments. (U.K.)

  14. Basic electrical installation work level 2

    CERN Document Server

    Linsley, Trevor

    2015-01-01

    Everything needed to pass the first part of the City & Guilds 2365 Diploma in Electrical InstallationsUpdated in line with the 3rd Amendment of the 17th Edition IET Wiring Regulations, this new edition covers the City & Guilds 2365-02 course. Written in an accessible style with a chapter dedicated to each unit of the syllabus, this book helps you to master each topic before moving on to the next. End of chapter revision questions enable learners to check their understanding and consolidate key concepts learnt in each chapter. With a companion website containing videos, animations, worksheets a

  15. Installation Management Command - Flattening or Flat-lining?

    Science.gov (United States)

    2012-03-22

    3624 Market Street, Philadelphia, PA 19104, (215) 662-5606. The Commission on Higher Education is an institutional accrediting agency recognized by...3624 Market Street, Philadelphia, PA 19104, (215) 662-5606. The Commission on Higher Education is an institutional accrediting agency recognized by...for functional support. Key account management is a concept used in the corporate realm, with companies such as Pepsi Bottling Group, International

  16. Installation Restoration Program Records Search for Alaska DEW Line Stations

    Science.gov (United States)

    1982-06-01

    Chlorinate hydrocarbons Radar components Calgon corrosion inhibitor 55 gallon drums (empty) Lye Lime Corrosives Antifreeze Paper Wood Plastics AVGAS...Factor Subsoare A I Persistence Vcor * Subaccro a C. Appl~y "yicaJ. state =iLtipiisr Sub•coce 3 X Physical State Mltipler - Waste Caracteristics

  17. AWAKE starts the equipment installation phase

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    AWAKE is the proof-of-principle experiment whose aim is to use protons to generate powerful wakefields to accelerate an electron beam. With accelerator gradients hundreds of times higher than those used in current systems, this technique could revolutionise the field of particle acceleration. Installed in the tunnel previously used by the CNGS facility, AWAKE is completing the service installation phase and will receive the plasma cell in the coming months.   The AWAKE proton line with all the magnets installed. (Image: AWAKE collaboration.) AWAKE is the world’s first proton-driven plasma wakefield acceleration experiment. In AWAKE, a beam of protons from the SPS will be travelling through a plasma cell and this will generate a wakefield that, in turn, will accelerate an electron beam. A laser will ionise the gas in the plasma cell and seed the self-modulation instability that will trigger the wakefield in the plasma. The project aims to prove that the plasma wakefield can be driv...

  18. Successful pipeline installation for Parque das Conchas development; Subsea installation

    Energy Technology Data Exchange (ETDEWEB)

    Bartz, Cesar

    2010-07-01

    Subsea 7 has successfully delivered again in Brazilian deep-waters. The subsea engineering and construction company has recently completed pipeline installation activities for the Parque das Conchas (BC-10) development, offshore Brazil. (AG)

  19. NBS-LANL RTM injector installation

    International Nuclear Information System (INIS)

    Wilson, M.A.; Ayres, R.L.; Cutler, R.I.; Lindstrom, E.R.; Martin, E.R.; Mohr, D.L.; Penner, S.; Yoder, N.R.; Young, L.M.

    1983-01-01

    The injector for the NBS-LANL CW racetrack microtron consists of a 100 KeV electron gun and beam transport line followed by a 5 MeV linac. The function of the gun and transport line, which have been installed at NBS, is to provide a chopped and bunched 100 KeV and up to 0.67 mA dc or pulsed beam of very low transverse emittance for matched insertion into the linac. In this paper the authors present both the design and construction details of the 100 KeV system and the results of preliminary beam tests. The tests conducted thus far show the gun and transport system to be performing well within design specifications

  20. Teaching adolescents with severe disabilities to use the public telephone.

    Science.gov (United States)

    Test, D W; Spooner, F; Keul, P K; Grossi, T

    1990-04-01

    Two adolescents with severe disabilities served as participants in a study conducted to train in the use of the public telephone to call home. Participants were trained to complete a 17-step task analysis using a training package which consisted of total task presentation in conjunction with a four-level prompting procedure (i.e., independent, verbal, verbal + gesture, verbal + guidance). All instruction took place in a public setting (e.g., a shopping mall) with generalization probes taken in two alternative settings (e.g., a movie theater and a convenience store). A multiple probe across individuals design demonstrated the training package was successful in teaching participants to use the telephone to call home. In addition, newly acquired skills generalized to the two untrained settings. Implications for community-based training are discussed.

  1. Impact of telephone nursing education program for equity in healthcare

    OpenAIRE

    H?glund, Anna T.; Carlsson, Marianne; Holmstr?m, Inger K.; Kaminsky, Elenor

    2016-01-01

    Background The Swedish Healthcare Act prescribes that healthcare should be provided according to needs and with respect for each person?s human dignity. The goal is equity in health for the whole population. In spite of this, studies have revealed that Swedish healthcare is not always provided equally. This has also been observed in telephone nursing. Therefore, the aim of the present study was to investigate if and how an educational intervention can improve awareness of equity in healthcare...

  2. Demographic corrections for the modified Telephone Screening for Cognitive Status

    OpenAIRE

    Dennett, Kathryn; Tometich, Danielle; Duff, Kevin

    2013-01-01

    Despite the growing use of the modified Telephone Interview for Cognitive Status (mTICS) as a cognitive screening instrument, it does not yet have demographic corrections. Demographic data, mTICS, and a neuropsychological battery were collected from 274 community dwelling older adults with intact cognition or mild cognitive impairments. Age, education, premorbid intellect, and depression were correlated with mTICS scores. Using regression equations, age and education significantly predicted m...

  3. The Impact of Caller Gender on Telephone Crisis-Helpline Workers' Interpretation of Suicidality in Caller Vignettes.

    Science.gov (United States)

    Hunt, Tara; Wilson, Coralie J; Caputi, Peter; Wilson, Ian; Woodward, Alan

    2018-04-23

    Telephone crisis-line workers (TCWs) are trained in a variety of techniques and skills to facilitate the identification of suicidal callers. One factor that may influence the implementation of these skills is gender. This study used an experimental design to explore whether helpline callers being identified as male or female is associated with TCWs’ ratings of callers’ potential for suicide risk and TCWs’ intention to use support- or intervention-oriented skills with callers. Data were collected using an online self-report survey in an Australian sample of 133 TCWs. The results suggest that under some circumstances the callers’ gender might influence TCWs’ intention to use intervention-oriented skills with the caller. Implications for the training of telephone crisis workers, and those trained in suicide prevention more broadly are discussed.

  4. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  5. Installation of the Gbar LINAC

    CERN Multimedia

    Maximilien, Brice

    2017-01-01

    Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.

  6. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  7. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  8. Suitcase to Audit Solar Installations

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Blas, J. de; Molinero, A.; Navarrete, J. J.; Yuste, C.

    2001-01-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  9. Mobile phones are a viable option for surveying young Australian women: a comparison of two telephone survey methods

    Directory of Open Access Journals (Sweden)

    Liu Bette

    2011-11-01

    Full Text Available Abstract Background Households with fixed-line telephones have decreased while mobile (cell phone ownership has increased. We therefore sought to examine the feasibility of recruiting young women for a national health survey through random digit dialling mobile phones. Methods Two samples of women aged 18 to 39 years were surveyed by random digit dialling fixed and mobile numbers. We compared participation rates and responses to a questionnaire between women surveyed by each contact method. Results After dialling 5,390 fixed-lines and 3,697 mobile numbers, 140 and 128 women were recruited respectively. Among women contacted and found to be eligible, participation rates were 74% for fixed-lines and 88% for mobiles. Taking into account calls to numbers where eligibility was unknown (e.g. unanswered calls the estimated response rates were 54% and 45% respectively. Of women contacted by fixed-line, 97% reported having a mobile while 61% of those contacted by mobile reported having a fixed-line at home. After adjusting for age, there were no significant differences between mobile-only and fixed-line responders with respect to education, residence, and various health behaviours; however compared to those with fixed-lines, mobile-only women were more likely to identify as Indigenous (OR 4.99, 95%CI 1.52-16.34 and less likely to live at home with their parents (OR 0.09, 95%CI 0.03-0.29. Conclusions Random digit dialling mobile phones to conduct a health survey in young Australian women is feasible, gives a comparable response rate and a more representative sample than dialling fixed-lines only. Telephone surveys of young women should include mobile dialling.

  10. Survey on the Use of Mobile Telephone for Micro and Small ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Survey on the Use of Mobile Telephone for Micro and Small Business ... In Ghana, as in other developing countries, mobile telephones are pervasive, and used ... to announce that the first call for applications for the new Early Career Women.

  11. 75 FR 6704 - In the Matter of Certain Mobile Telephones and Wireless Communication Devices Featuring Digital...

    Science.gov (United States)

    2010-02-10

    ... States after importation of certain mobile telephones and wireless communication devices featuring... INTERNATIONAL TRADE COMMISSION [Investigation No. 337-TA-663] In the Matter of Certain Mobile Telephones and Wireless Communication Devices Featuring Digital Cameras, and Components Thereof; Notice of...

  12. 75 FR 65654 - In the Matter of: Certain Mobile Telephones and Wireless Communication Devices Featuring Digital...

    Science.gov (United States)

    2010-10-26

    ... States after importation of certain mobile telephones and wireless communication devices featuring... INTERNATIONAL TRADE COMMISSION [Investigation No. 337-TA-703] In the Matter of: Certain Mobile Telephones and Wireless Communication Devices Featuring Digital Cameras, and Components Thereof;Notice of...

  13. 77 FR 43858 - Certain Mobile Telephones and Wireless Communication Devices Featuring Digital Cameras, and...

    Science.gov (United States)

    2012-07-26

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 337-TA-703] Certain Mobile Telephones and Wireless Communication Devices Featuring Digital Cameras, and Components Thereof; Determination To Review... importation, and the sale within the United States after importation of certain mobile telephones and wireless...

  14. Topo-Iberia GPS network: installation complete

    Science.gov (United States)

    Khazaradze, G.

    2009-04-01

    As part of the project, titled "Geociencias en Iberia: Estudios integrados de topografía y evolución 4D: Topo-Iberia", we have established a network of 26 continuous GPS stations, covering the Spanish part of the Iberian Peninsula (22 stations) and Morocco (4 stations). A major objective behind the establishment of this array is to monitor millimeter level deformation of the crust due to the collision of African and Eurasian (including Iberian) tectonic plates. More specific goals of the project include the identification of the areas and/or specific seismic faults which exhibit higher deformation rates, which could imply an increased seismic hazard in these specific areas. The network has been designed as two X-shaped transects crossing the peninsula from NE to SW and NW to SE, with relatively coarse distribution of the stations, superimposed with denser coverage in the seismically active areas of the Betics, Pyrenees and Cantabrian chains. The majority of the built monuments consist of 1.5-1.8 m tall concrete pillars of 40 cm in diameter anchored to the bedrock using iron rebars. One station in Huesca was built according the UNAVCO's short drilled braced monument (SDBM) specifications. All the monuments were equipped with the SCIGN leveling mounts to ensure the precise antenna alignment and re-alignment in case of the antenna replacement, as well as, tamper resistance of the monument mark. In places were the snow accumulation was possible the antennas were covered with plastic radomes. The instrumentation used is Trimble NetRS dual-frequency receivers with choke-ring antennas. The communication is mainly via cellular telephone system. As of December 2008, the network installation has been competed and all the stations are fully operational. Here we report the milestones of the installation of the network and, as well as, present the first preliminary results of the analysis of the data. Besides the newly established Topo-Iberia CGPS stations, we have included

  15. 75 FR 78269 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Telephone...

    Science.gov (United States)

    2010-12-15

    ... for OMB Review; Comment Request; Telephone Point of Purchase Survey ACTION: Notice. SUMMARY: The... information collection request (ICR) titled, ``Telephone Point of Purchase Survey,'' to the Office [email protected] . SUPPLEMENTARY INFORMATION: The purpose of the Telephone Point of Purchase Survey is to...

  16. 78 FR 78389 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Telephone...

    Science.gov (United States)

    2013-12-26

    ... for OMB Review; Comment Request; Telephone Point of Purchase Survey ACTION: Notice. SUMMARY: The... request (ICR) revision titled, ``Telephone Point of Purchase Survey,'' to the Office of Management and... seeks to make minor modifications to the Telephone Point of Purchase Survey (TPOPS) and extend its PRA...

  17. 75 FR 8112 - In the Matter of Certain Mobile Telephones and Wireless Communication Devices Featuring Digital...

    Science.gov (United States)

    2010-02-23

    ... importation of certain mobile telephones and wireless communication devices featuring digital cameras, and... importation of certain mobile telephones or wireless communication devices featuring digital cameras, or... INTERNATIONAL TRADE COMMISSION [Inv. No. 337-TA-703] In the Matter of Certain Mobile Telephones...

  18. 75 FR 21979 - NRC Region II Address and Main Telephone Number Changes

    Science.gov (United States)

    2010-04-27

    ... Region II Address and Main Telephone Number Changes AGENCY: Nuclear Regulatory Commission. ACTION: Final... address for its Region II office and to update the main telephone number. The Region II office move and... update the NRC Region II office street address and office main telephone number. The physical location of...

  19. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  20. Remote monitoring of cathodic protection rectifiers of the Bolivia-Brazil Gas Pipeline using low orbit satellite telephone; Monitoracao remota de retificadores de protecao catodica do Gasoduto Bolivia-Brasil utilizando telefone via satelite de baixa orbita

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, Jorge Fernando Pereira [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    The present paper has for objective to present the information collected during definitions, development, implementation, testing and operation phases of the Pilot System for monitoring of the Cathodic Protection Rectifiers MS-10 and SP-09, installed on the Bolivia-Brazil Gas Pipeline. The adopted solution for the Pilot System includes, basically, communication through low-earth satellite telephone, inter linked to the public telephone net, acquisition and data transmission system (Remote Terminal Unit) and data reception in the Supervision and Control Room. (author)

  1. Attacks on public telephone networks: technologies and challenges

    Science.gov (United States)

    Kosloff, T.; Moore, Tyler; Keller, J.; Manes, Gavin W.; Shenoi, Sujeet

    2003-09-01

    Signaling System 7 (SS7) is vital to signaling and control in America's public telephone networks. This paper describes a class of attacks on SS7 networks involving the insertion of malicious signaling messages via compromised SS7 network components. Three attacks are discussed in detail: IAM flood attacks, redirection attacks and point code spoofing attacks. Depending on their scale of execution, these attacks can produce effects ranging from network congestion to service disruption. Methods for detecting these denial-of-service attacks and mitigating their effects are also presented.

  2. Towards a 21st century telephone exchange at CERN

    CERN Document Server

    AUTHOR|(SzGeCERN)745509; Hesnaux, Anthony Gerard; Sierra, Rodrigo; Chapron, Frederic; CERN. Geneva. IT Department

    2015-01-01

    The advent of mobile telephony and Voice over IP (VoIP) has significantly impacted the traditional telephone exchange industry—to such an extent that private branch exchanges are likely to disappear completely in the near future. For large organisations, such as CERN, it is important to be able to smooth this transition by implementing new multimedia platforms that can protect past investments and the flexibility needed to securely interconnect emerging VoIP solutions and forthcoming developments such as Voice over LTE (VoLTE). We present the results of ongoing studies and tests at CERN of the latest technologies in this area.

  3. Alternative Measured-Service Rate Structures for Local Telephone Service,

    Science.gov (United States)

    1980-06-01

    contracts or grants . Views expressed in a Papet are the author’s own, and are not necessarily shared by Rand or its research sponsors. The Rand Corporation...by National Science Foundation, grant DAR 77-16286 to The Rand Corporation. Measuring costs depend strongly on the technology of the telephone network...a Budget Constraint. The Case of the Two-Part Tariff," Review of Economic Studies, July 1974, Vol. 41, pp. 337-345. -28- Oi, W. Y., "A Disneyland

  4. Telephone consultations on exposure to nuclear disaster radiation

    International Nuclear Information System (INIS)

    Yashima, Sachiko; Chida, Koichi

    2014-01-01

    The Fukushima nuclear disaster occurred on March 11, 2011. For about six weeks, I worked as a counselor for phone consultations regarding radiation risk. I analyzed the number of consultations, consultations by telephone, and their changing patterns with elapse of time, to assist with consultations about risk in the future. There were a large number of questions regarding the effects of radiation, particularly with regard to children. We believe that counseling and risk communication are the key to effectively informing the public about radiation risks. (author)

  5. The safety of nuclear installations

    International Nuclear Information System (INIS)

    1993-01-01

    This Safety Fundamental publication sets out basic objectives, concepts and principles for ensuring safety that can be used both by the IAEA in its international assistance operations and by Member States in their national nuclear programmes. These Safety Fundamentals apply primarily to those nuclear installations in which the stored energy developed in certain situations could potentially results in the release of radioactive material from its designated location with the consequent risk of radiation exposure of people. These principles are applicable to a broad range of nuclear installations, but their detailed application will depend on the particular technology and the risks posed by it. In addition to nuclear power plants, such installations may include: research reactors and facilities, fuel enrichment, manufacturing and reprocessing plants; and certain facilities for radioactive waste treatment and storage

  6. Installation of a tandem-type accelerator mass spectrometer

    International Nuclear Information System (INIS)

    Mizushima, Toshihiko; Togawa, Orihiko; Mizutani, Yoshihiko; Yamamoto, Tadatoshi

    2000-02-01

    Tandem-type accelerator mass spectrometer (hereinafter referred to as Tandetron) was installed at the Ominato Facility of Mutsu Establishment, JAERI in April, 1997. The objective of its installation is to investigate the mechanism of the mixing and circulation of seawater in the ocean, by collecting seawater samples around Japan and analyzing the horizontal and vertical distributions of 14 C contained in the samples. The Tandetron consists of two lines to measure isotopic ratios of carbon and those of heavier iodine. The adjustment for the carbon line was finished and the measurements of seawater samples were started. The iodine line, on the other hand, is on the final step of its adjustment and performance tests are being carried out with a TOF (Time of Flight) detector. The iodine line will be used to analyze 129 I released from a spent nuclear fuel reprocessing plant and other nuclear facilities. In this report, we summarize the status of installation of the carbon and iodine lines for the Tandetron. The report describes the situations of their adjustments until now, the outline of the Tandetron, tests of measurement performance, evaluation and inspection of shielding performance, problems and their solutions, and so on. (author)

  7. Industrial installation surveillance acoustic device

    International Nuclear Information System (INIS)

    Marini, Jean; Audenard, Bernard.

    1981-01-01

    The purpose of this invention is the detection of possible impacts of bodies migrating inside the installation, using acoustic sensors of the waves emitted at the time of impact of the migrating bodies. This device makes it possible to take into account only those acoustic signals relating to the impacts of bodies migrating in the area under surveillance, to the exclusion of any other acoustic or electric perturbing phenomenon. The invention has a preferential use in the case of a linear shape installation in which a fluid flows at high rate, such as a section of the primary system of a pressurized water nuclear reactor [fr

  8. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  9. Influence of digital and analogue cellular telephones on implanted pacemakers.

    Science.gov (United States)

    Altamura, G; Toscano, S; Gentilucci, G; Ammirati, F; Castro, A; Pandozi, C; Santini, M

    1997-10-01

    The aim of this study was to find out whether digital and analogue cellular 'phones affect patients with pacemakers. The study comprised continuous ECG monitoring of 200 pacemaker patients. During the monitoring certain conditions caused by interference created by the telephone were looked for: temporary or prolonged pacemaker inhibition; a shift to asynchronous mode caused by electromagnetic interference; an increase in ventricular pacing in dual chamber pacemakers, up to the programmed upper rate. The Global System for Mobile Communications system interfered with pacing 97 times in 43 patients (21.5%). During tests on Total Access of Communication System telephones, there were 60 cases of pacing interference in 35 patients (17.5%). There were 131 interference episodes during ringing vs 26 during the on/off phase; (P 4 s) was seen at the pacemaker 'base' sensing value in six patients using the Global system but in only one patient using Total Access. Cellular 'phones may be dangerous for pacemaker patients. However, they can be used safely if patients do not carry the 'phone close to the pacemaker, which is the only place where high risk interference has been observed.

  10. Environmental reduction of mobile telephone base station produced radiation exposures

    International Nuclear Information System (INIS)

    Vermiglio, G.; Tripepi, M.G.; Testagrossa, B.; Sansotta, C.

    2006-01-01

    In this work the authors discuss about their own proposal about a model to modify how the Wireless Telephone Base Stations (W.T.B.S.) works. The proposal, which was made having in mind the GSM technology, can be applied to all other kind of similar technologies and was pointed out as a different way of working of the W.T.B.S. without any modifications on their distribution over the territory. After a short review of the state of the art about the technology and the basis of wireless telephone base stations, the baselines and the principles of the proposed model are discussed, facing out the most significant parameters obtained from the way W.T.B.S. are working at present towards the proposed one. Then the authors illustrate the possible advantages o f the proposed model in terms of environmental, socials and energy savings aspects. It is the authors opinion that such model can be a simple and no -cost solution to apply to the existing infrastructures; more over it can be of interest either for mobile phone companies or for environmental and/or customers associations. (authors)

  11. Pricing of miniature vehicles made from telephone card waste

    Science.gov (United States)

    Puspitasari, N. B.; Pujotomo, D.; Muhardiansyah, H.

    2017-12-01

    The number of electronic devices in Indonesia in the last 10 years has been increasing quite drastically which contributes to more electronic waste. E-waste or electronic waste have different characteristics from other kinds of waste. Components of electronic waste often poisonous, consisting dangerous chemicals. The telephone card wasted is also an electronic waste. One alternative to handle and manage telephone card waste is to recycle it into collectible miniature vehicles. But the price of these miniatures is quite high, causing low interest in buying them. A research on the price of miniature vehicles in relation to consumers’ Ability to Pay (ATP) and Willingness to Pay (WTP) needs to be done. Segmentation analysis data, target, product positioning and product marketing mix are needed before commencing the research. Data collection is done through a survey by spreading questionnaire to 100 miniature vehicle collectors in Semarang, questioning their ability and willingness to pay recycled miniature vehicles. Calculations showed average ATP of Rp.112.520, 24 and average WTP of Rp.76.870. The last result showed the estimate pricing according to ATP and WTP which is Rp.66.000 with 58% of the respondents claiming to be willing and able to pay that price.

  12. Horn installed in CNGS tunnel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The horn is installed for the CERN Neutrinos to Gran Sasso (CNGS) project. Protons collide with a graphite target producing charged particles that are focussed by the magnetic field in the horn. These particles will then pass into a decay tube where they decay into neutrinos, which travel towards a detector at Gran Sasso 732 km away in Italy.

  13. Installation tests for BERSAFE 88

    International Nuclear Information System (INIS)

    Bamfield, R.D.; Haigh, R.

    1989-02-01

    A set of ten test problems for each of the four BERSAFE stress analysis programs is provided. These problems along with this report, which forms part of the BERSAFE 88 documentation, constitute a test of the customers' BERSAFE installation. On running the problems and attaining results identical to those presented here, the customer should have some confidence that his system is operating correctly. (author)

  14. Solar Water Heater Installation Package

    Science.gov (United States)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  15. Installation package - home solar heater

    Science.gov (United States)

    1980-01-01

    Installation of commerical solar-heating system at two story, three bedroom house in New Hampshire is described in 65 page report. System collectors are integrated part of building replacing conventional roofing or siding. Report also includes general description of system, its operation and guidelines, orientation and references.

  16. YB0 SERVICES INSTALLATION COMPLETED

    CERN Document Server

    The beauty of the completed YB0 was briefly visible at P5 as preparations continue for Tracker installation. A tremendous effort, lasting 7 months and involving more than 100 workers on the busiest days, resulted in 5700 electrical cables, 780 optical cables with 65k fibre channels, and 550 pipes laid on YB0 for HB, EB and Tracker.

  17. Nuclear Plant Analyzer: Installation manual. Volume 1

    International Nuclear Information System (INIS)

    Snider, D.M.; Wagner, K.L.; Grush, W.H.; Jones, K.R.

    1995-01-01

    This report contains the installation instructions for the Nuclear Plant Analyzer (NPA) System. The NPA System consists of the Computer Visual System (CVS) program, the NPA libraries, the associated utility programs. The NPA was developed at the Idaho National Engineering Laboratory under the sponsorship of the US Nuclear Regulatory Commission to provide a highly flexible graphical user interface for displaying the results of these analysis codes. The NPA also provides the user with a convenient means of interactively controlling the host program through user-defined pop-up menus. The NPA was designed to serve primarily as an analysis tool. After a brief introduction to the Computer Visual System and the NPA, an analyst can quickly create a simple picture or set of pictures to aide in the study of a particular phenomenon. These pictures can range from simple collections of square boxes and straight lines to complex representations of emergency response information displays

  18. Ultrasonic data acquisition installation for basis and in-service testing of nuclear pressure vessels

    International Nuclear Information System (INIS)

    Gutmann, G.; Engl, G.

    1976-01-01

    The safety of nuclear installations requires continuous safety inspections during construction and operation. Essential parts of this safety inspection are the basis and in-line inspections. For this purpose installation systems are used which allow an optimal statement to be made regarding the conditions of tested components

  19. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and direct...

  20. Injuries caused by pets in Asian urban households: a cross-sectional telephone survey

    Science.gov (United States)

    Chan, Emily Y Y; Gao, Yang; Li, Liping; Lee, Po Yi

    2017-01-01

    Objectives Little is known about pet-related injuries in Asian populations. This study primarily aimed to investigate the incidence rate of pet-related household injuries in Hong Kong, an urban Chinese setting. Setting Cantonese-speaking non-institutionalised population of all ages in Hong Kong accessible by telephone land-line. Participants A total of 43 542 telephone numbers were dialled and 6570 residents successfully completed the interviews. Primary and secondary outcome measures Data of pet-related household injuries in the previous 12 months, pet ownership and socio-demographic characteristics were collected with a questionnaire. Direct standardisation of the incidence rates of pet-related household injuries by gender and age to the 2009 Hong Kong Population Census was estimated. Univariate and multivariate analyses were performed to estimate risks of socio-demographic factors and pet ownership for the injury. Results A total of 84 participants experienced pet-related household injuries in the past 12 months, with an overall person-based incidence rate of 1.28%. The majority of the victims were injured once (69.6%). Cats (51.6%) were the most common pets involved. Pet owners were at an extremely higher risk after controlling for other factors (adjusted OR: 52.0, 95% CI 22.1 to 98.7). Females, the unmarried, those with higher monthly household income and those living in lower-density housing were more likely to be injured by pets. Conclusions We project a pet-related household injury incidence rate of 1.24% in the general Hong Kong population, with 86 334 residents sustaining pet-related injuries every year. Pet ownership puts people at extremely high risk, especially the unmarried. Further studies should focus on educating pet owners to reduce pet-related injuries in urban Greater China. PMID:28110284

  1. Brief telephone interventions for problem gambling: a randomized controlled trial.

    Science.gov (United States)

    Abbott, Max; Hodgins, David C; Bellringer, Maria; Vandal, Alain C; Palmer Du Preez, Katie; Landon, Jason; Sullivan, Sean; Rodda, Simone; Feigin, Valery

    2018-05-01

    Problem gambling is a significant public health issue world-wide. There is substantial investment in publicly funded intervention services, but limited evaluation of effectiveness. This study investigated three brief telephone interventions to determine whether they were more effective than standard helpline treatment in helping people to reduce gambling. Randomized clinical trial. National gambling helpline in New Zealand. A total of 462 adults with problem gambling. INTERVENTIONS AND COMPARATOR: (1) Single motivational interview (MI), (2) single motivational interview plus cognitive-behavioural self-help workbook (MI + W) and (3) single motivational interview plus workbook plus four booster follow-up telephone interviews (MI + W + B). Comparator was helpline standard care [treatment as usual (TAU)]. Blinded follow-up was at 3, 6 and 12 months. Primary outcomes were days gambled, dollars lost per day and treatment goal success. There were no differences across treatment arms, although participants showed large reductions in gambling during the 12-month follow-up period [mean reduction of 5.5 days, confidence interval (CI) = 4.8, 6.2; NZ$38 lost ($32, $44; 80.6%), improved (77.2%, 84.0%)]. Subgroup analysis revealed improved days gambled and dollars lost for MI + W + B over MI or MI + W for a goal of reduction of gambling (versus quitting) and improvement in dollars lost by ethnicity, gambling severity and psychological distress (all P gambling severity than TAU or MI at 12 months and also better for those with higher psychological distress and lower self-efficacy to MI (all P gambling in New Zealand, brief telephone interventions are associated with changes in days gambling and dollars lost similar to more intensive interventions, suggesting that more treatment is not necessarily better than less. Some client subgroups, in particular those with greater problem severity and greater distress, achieve better outcomes when they receive more

  2. Evaluation of a wireless audio streaming accessory to improve mobile telephone performance of cochlear implant users.

    Science.gov (United States)

    Wolfe, Jace; Morais Duke, Mila; Schafer, Erin; Cire, George; Menapace, Christine; O'Neill, Lori

    2016-01-01

    The objective of this study was to evaluate the potential improvement in word recognition in quiet and in noise obtained with use of a Bluetooth-compatible wireless hearing assistance technology (HAT) relative to the acoustic mobile telephone condition (e.g. the mobile telephone receiver held to the microphone of the sound processor). A two-way repeated measures design was used to evaluate differences in telephone word recognition obtained in quiet and in competing noise in the acoustic mobile telephone condition compared to performance obtained with use of the CI sound processor and a telephone HAT. Sixteen adult users of Nucleus cochlear implants and the Nucleus 6 sound processor were included in this study. Word recognition over the mobile telephone in quiet and in noise was significantly better with use of the wireless HAT compared to performance in the acoustic mobile telephone condition. Word recognition over the mobile telephone was better in quiet when compared to performance in noise. The results of this study indicate that use of a wireless HAT improves word recognition over the mobile telephone in quiet and in noise relative to performance in the acoustic mobile telephone condition for a group of adult cochlear implant recipients.

  3. Personal health monitoring - exploiting the power of the personal telephone.

    Science.gov (United States)

    Hannan, Amir

    2015-11-01

    Many health issues that we currently face are related to our lifestyle choices. Educating patients can help them to make better informed health decisions. The internet and smartphones, mobile telephones that perform many of the functions of a computer, are becoming more accessible to the majority of the population. Applications on smartphones and professional health websites can signpost patients to trusted information and allow them to co-produce records. Empowering patients, staff and organizations through enabling access to records and understanding, building a partnership trust and the use of social media can enable people to do more and hopefully improve outcomes. In this article, I describe the steps we have taken to facilitate such interactions within our own primary care practice and the response of patients to these initiatives. © The Author(s) 2015.

  4. Self-rated worry in acute care telephone triage

    DEFF Research Database (Denmark)

    Gamst-Jensen, Hejdi; Huibers, Linda; Pedersen, Kristoffer

    2018-01-01

    the caller's ability to quantify their degree of worry, the association between degree of worry and variables related to the caller, the effect of degree of worry on triage outcome, and the thematic content of the caller's worry. DESIGN AND SETTING: A mixed-methods study with simultaneous convergent design...... combining descriptive statistics and thematic analysis of 180 calls to a Danish out-of-hours service. METHOD: The following quantitative data were measured: age of caller, sex, reason for encounter, symptom duration, triage outcome, and degree of worry (rated from 1 = minimally worried to 5 = extremely...... worried). Qualitative data consisted of audio-recorded telephone calls. RESULTS: Most callers (170 out of 180) were able to scale their worry when contacting the out-of-hours service (median = 3, interquartile range = 2-4, mean = 2.76). Degree of worry was associated with female sex (odds ratio [OR] 1...

  5. Report: Controls and Oversight Needed to Improve Administration of EPA’s Customer Service Lines

    Science.gov (United States)

    Report #13-P-0432, September 26, 2013. The EPA has a variety of resources—including telephone hotlines, Web clearinghouses, and other online reference information—which the OIG has categorized as customer service lines (CSLs).

  6. Radiation safety assessment of mobile telephone base stations

    International Nuclear Information System (INIS)

    Mohd Yusof Mohd Ali; Mohd Anuar Majid; Mohd Amirul Nizam

    2002-01-01

    Mobile telephone is fast getting popular among users and in fact it has become one of the fastest selling electronic products in the world. More base stations are expected to be built to meet such high demands and this has caused great concerned among members of the public, especially those living close to the stations, about the potential harmful health effects of radiofrequency (RF) radiation produced by such facilities. A project was initiated by MINT in early 2000 with aims to assess the radiation levels present in the areas around the base stations and to establish baseline data on the pattern and trend of the radiation emission from each different set up of the facilities. This paper highlights some basics facts about mobile telephones and preliminary findings of the project. The assessment has been carried out at 16 base station sites and the results indicate that the radiation levels present around these sites are very low. Their broadband readings vary between below the detection limit of 0.3μWatts/cm 2 to 11 μWatts/cm 2 and they are comparable to normal background radiation present in places away from any base stations. The highest level observed was 1.5% of the exposure limit recommended for members of the public. However, locations at close distance in front of the the antenna can be very serious in term of radiation exposure since the radiation level here can easily exceed the permissible exposure limit for public. Safety precaution needs to be taken when entering these areas and they should be out of bound for members of the public. (Author)

  7. Physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Toepfer, K.

    1989-01-01

    This contribution investigates the possible danger and the legal basis of physical protection and explains the current, integrated system provided for, as well as the underlying possible scenarios of an assault: (1) by a violent crowd of aggressors outside the installation, (2) by a small group of aggressors outside the installation, (3) by a person allowed to enter (internal assault). The physical protection system supplements the internal safety measures to enhance protection against hypothetical and possible acts of terrorism or other criminal assault. The system covers external and internal controlled areas, access monitoring, physical protection control room and service, security checks of the personnel, and activities to disclose sabotage. Some reflections on the problem field between security controls and the constitutional state conclude this contribution. (orig./HSCH) [de

  8. The dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Lacoste, A.C.; Duthe, M.; Mignon, H.; Lambert, F.; Pradel, Ph.; Hillewaere, J.P.; Dupre la Tour, St.; Mandil, C.; Weil, L.; Eickelpasch, N.; Finsterwalder, L.

    1997-01-01

    for nuclear installations, the dismantling is an important part of their exploitation. The technology of dismantling is existing and to get a benefit from the radioactive decay, it seems more easy for operating company such E.D.F. to wait for fifty years before dismantling. But in order to get the knowledge of this operation, the Safety Authority wanted to devote this issue of 'Controle'to the dismantling method. This issue includes: the legal aspects, the risks assessment, the dismantling policy at E.D.F., the site of Brennilis (first French experience of dismantling), the dismantling techniques, the first dismantling of a fuel reprocessing plant, comparison with classical installations, economic aspect, some German experiences, the cleansing of the american site of Handford. (N.C.)

  9. ATLAS Software Installation on Supercomputers

    CERN Document Server

    Undrus, Alexander; The ATLAS collaboration

    2018-01-01

    PowerPC and high performance computers (HPC) are important resources for computing in the ATLAS experiment. The future LHC data processing will require more resources than Grid computing, currently using approximately 100,000 cores at well over 100 sites, can provide. Supercomputers are extremely powerful as they use resources of hundreds of thousands CPUs joined together. However their architectures have different instruction sets. ATLAS binary software distributions for x86 chipsets do not fit these architectures, as emulation of these chipsets results in huge performance loss. This presentation describes the methodology of ATLAS software installation from source code on supercomputers. The installation procedure includes downloading the ATLAS code base as well as the source of about 50 external packages, such as ROOT and Geant4, followed by compilation, and rigorous unit and integration testing. The presentation reports the application of this procedure at Titan HPC and Summit PowerPC at Oak Ridge Computin...

  10. Quality assurance in nuclear installations

    International Nuclear Information System (INIS)

    Torres M, Nelson.

    1985-08-01

    It has been proven that the bad quality of products, equipment, installations, and services is not due to the lack of tests, experiments and verifications. The main causes are associated with insufficient organization of the activities that have influence on the quality. The garantee of quality is conceptualized as an appropriate instrument composed of normalized criteria initially in advanced technologies. Such as nuclear science and aerospace technology. However, with the appropriate modifications it can be applied to conventional technologies

  11. Method of installing well conductors

    International Nuclear Information System (INIS)

    Houser, D.M.

    1991-01-01

    This patent describes a method of installing a well conductor in a marine environment. It comprises sealing a well conductor with a watertight plug; submerging the conductor from an elevated platform; adding additional conductor lengths to the conductor as needed thereby forming a conductor string; adjusting the buoyancy of the string to control the lowering of the string to the sea floor; and drilling through the plug after the conductor string has achieved the desired penetration depth

  12. Seismic evaluation of nuclear installations

    International Nuclear Information System (INIS)

    Mattar Neto, Miguel

    1997-01-01

    Some considerations regarding extreme external events, natural or man-induce, such as earthquakes, floods, air crashes, etc, shall be done for nuclear facilities to minimizing the potential impact of the installation on the public and the environment. In this paper the main aspects of the seismic evaluation of nuclear facilities (except the nuclear power reactors) will be presented based on different codes and standards. (author). 7 refs., 2 tabs

  13. Mounting clips for panel installation

    Science.gov (United States)

    Cavieres, Andres; Al-Haddad, Tristan; Goodman, Joseph

    2017-07-11

    A photovoltaic panel mounting clip comprising a base, central indexing tabs, flanges, lateral indexing tabs, and vertical indexing tabs. The mounting clip removably attaches one or more panels to a beam or the like structure, both mechanically and electrically. It provides secure locking of the panels in all directions, while providing guidance in all directions for accurate installation of the panels to the beam or the like structure.

  14. Installed capacity in New York

    International Nuclear Information System (INIS)

    Charlton, J.

    2006-01-01

    This presentation discussed capacity issues related to the New York Independent System Operator (NYISO). The NYISO's market volume was approximately $11 billion in 2005, and it was responsible for providing 32,075 MW of electricity at peak load to its users. Regulatory uncertainty is currently discouraging investment in new generating resources. All load serving entities are required to contract for sufficient capacity in order to meet their capacity obligations. Market participants currently determine capacity and energy revenues. The NYISO market allows suppliers to recover variable costs for providing ancillary services, and the economic value of the revenue source governs decisions made in the wholesale electricity market. The installed capacity market was designed as a spot auction deficiency auction. Phased-in demand curves are used to modify the installed capacity market's design. A sloped demand curve mechanism is used to value capacity above the minimum requirement for both reliability and competition. Participation in the day-ahead market enhances competition and exerts downward pressure on energy and ancillary service market prices. It was concluded that the market structures and design features of the installed capacity markets recognize the need for system reliability in addition to encouraging robust competition and recognizing energy price caps and regulatory oversights. tabs., figs

  15. Leukaemia near british nuclear installations

    International Nuclear Information System (INIS)

    Hubert, D.

    1991-01-01

    An excess of childhood leukaemia has been seen near some British nuclear installations, especially near the Sellafield reprocessing plant. The same result was found in a more general study including a large number of nuclear sites. Similar studies made in USA, Canada and France have been negative. Moreover, epidemiological studies made in England have discovered other childhood leukaemia clusters in areas far from nuclear facilities, and especially near potential sites of nuclear installations. Several explanations are suggested but no definite conclusion is yet possible. Doses from radioactive releases seem to be too low to account for the additional deaths from leukaemia by environmental contamination. A virus activation, which might be associated with population influx into rural isolated areas, has been considered. The hypothesis of genetic mutation induced by ionising radiation in the fathers of children with leukaemia has been made because a higher risk of leukaemia was observed for children of fathers employed at Sellafield. No firm conclusion is possible considering the small number of observed cases and the lack of excess leukaemias in the offspring of Hiroshima and Nagasaki survivors. The possibility of internal contamination, chemicals or even radon is discussed as other causes. Studies in progress might allow to find an answer to the problem of leukaemia in the vicinity of British nuclear installations [fr

  16. A Telephone Communication Skills Exercise for Veterinary Students: Experiences, Challenges, and Opportunities.

    Science.gov (United States)

    Grevemeyer, Bernard; Betance, Larry; Artemiou, Elpida

    2016-01-01

    Evidence from human medicine shows a rise in telephone communication in support of after-hours services and in providing medical advice, follow-up information, etc. While specific training programs are continuously being developed for human medical education, limited publications are available on training veterinary students in telephone communication. Presented is our method of introducing a telephone communication skills exercise to third-year veterinary students. The exercise progressed over three phases and currently follows the principles of the Calgary-Cambridge Guide. Challenges and improvements on implementing a telephone communication exercise are discussed. Within veterinary communication curricula, attention should be given to the specific communication skills required for successful telephone consultations. In the absence of visual nonverbal cues and prompts during a telephone interaction, communication skills must be applied with greater intent and attention to achieve an effective consultation outcome.

  17. Toroid field coil shear key installation study, DOE task No. 22

    International Nuclear Information System (INIS)

    Jones, C.E.; Meier, R.W.; Yuen, J.L.

    1995-01-01

    Concepts for fitting and installation of the scissor keys, triangular keys, and truss keys in the ITER Toroidal Field (TF) Coil Assembly were developed and evaluated. In addition, the process of remote removal and replacement of a failed TF coil was considered. Two concepts were addressed: central solenoid installed last (Naka Option 1) and central solenoid installed first (Naka Option 2). In addition, a third concept was developed which utilized the favorable features of both concepts. A time line for installation was estimated for the Naka Option 1 concept

  18. Speech perception and communication ability over the telephone by Mandarin-speaking children with cochlear implants.

    Science.gov (United States)

    Wu, Che-Ming; Liu, Tien-Chen; Wang, Nan-Mai; Chao, Wei-Chieh

    2013-08-01

    (1) To understand speech perception and communication ability through real telephone calls by Mandarin-speaking children with cochlear implants and compare them to live-voice perception, (2) to report the general condition of telephone use of this population, and (3) to investigate the factors that correlate with telephone speech perception performance. Fifty-six children with over 4 years of implant use (aged 6.8-13.6 years, mean duration 8.0 years) took three speech perception tests administered using telephone and live voice to examine sentence, monosyllabic-word and Mandarin tone perception. The children also filled out a questionnaire survey investigating everyday telephone use. Wilcoxon signed-rank test was used to compare the scores between live-voice and telephone tests, and Pearson's test to examine the correlation between them. The mean scores were 86.4%, 69.8% and 70.5% respectively for sentence, word and tone recognition over the telephone. The corresponding live-voice mean scores were 94.3%, 84.0% and 70.8%. Wilcoxon signed-rank test showed the sentence and word scores were significantly different between telephone and live voice test, while the tone recognition scores were not, indicating tone perception was less worsened by telephone transmission than words and sentences. Spearman's test showed that chronological age and duration of implant use were weakly correlated with the perception test scores. The questionnaire survey showed 78% of the children could initiate phone calls and 59% could use the telephone 2 years after implantation. Implanted children are potentially capable of using the telephone 2 years after implantation, and communication ability over the telephone becomes satisfactory 4 years after implantation. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  19. Water and power installation for Lanzarote (Canary Islands) Spain

    Energy Technology Data Exchange (ETDEWEB)

    Krebs, F.

    1977-03-01

    Water producing and electrical generating facilities had to be increased on the Spanish Canary Island of Lanzarote for it to develop beyond its 1972 status. The Ministry of Public Works, prepared specifications for a turnkey installation of two 2500 M/sup 3//D desalting plants and a 5 MW (net) generating system. In 1973 through international competition Babcock and Wilcox, Espanola won a contract to build the installation. In December 1975 the construction of the project was completed. In early January 1976 the first line was producing 103% of the rated production at a thermal efficiency of 120% of the rated value. The second line was modified to operate at a reduced maximum brine temperature and commissioned. This plant was brought to full production which was 115% of the rated production in 2/sup 1///sub 2/ days. Problems and delays during the commissioning, were minimal. A 5 days performance test of the installation was run. During this test the water production was 111/sup 1///sub 2/% of the rated value at a specific energy consumption of 93% of the rated value while the maximum brine temperature was maintained 6/sup 0/C less than the design value. The high performances were achieved because the plants were well designed and built and properly commissioned. During the first 4/sup 1///sub 2/ months that the owner operated the installation it provided water and power as demanded. During that time the average plant production was 107% of the rated capacity.

  20. Physical installation of Pelletron and electron cooling system

    International Nuclear Information System (INIS)

    Hurh, P.

    1997-01-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here

  1. Installation of an isotope separator in Debrecen

    International Nuclear Information System (INIS)

    Gacsi, Z.; Gulyas, J.; Vitez, A.; Csige, L.; Krasznahorkay, A.

    2005-01-01

    Complete text of publication follows. An isotope separator named OSIRIS was decommissioned in Studsvik, Sweden last July. Researchers there offered this equipment to us for dismantling and moving it over to ATOMKI in Debrecen for installation at the cyclotron lab and save and use it in nuclear physics and other sciences where stable and radioactive isotopes are used extensively for fundamental and applied research. Since the separator was used to separate radioactive isotopes, the ion source with its beam extracting, shaping, and transporting accessories, as well as the lining inside the bending magnet, furthermore the beam diagnostic and shaping elements in the 'switchyard' part of the separator had to stay in Studsvik because of the high radioactive contamination. In order to operate this equipment, first we have to design and manufacture these parts together with a new endstation for the collection and handling of the separated isotopes. Parallel with the installation, we also concentrate on different applications of an isotope separator, including separation of stable isotopes for labelling special compounds used in many branches of sciences, medical care, and industry, and on studying single ion implantation possibilities, as well as on the production of special targets for nuclear physics research. First we want to separate stable isotopes, and then, when we overcome all technical pitfalls, we will consider using this equipment to separate radioactive isotopes as well. Our intention is to have this equipment available to anyone at ATOMKI and elsewhere interested in using its capabilities in their own research fields. Consequently, all comments, suggestion, and ideas are welcome now and continuously, since the design and manufacture of parts can then be oriented by taking into account all the suggestions as much as possible. (author)

  2. Nuclear installations: decommissioning and dismantling

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This document is a compilation of seven talks given during the 1995 EUROFORUM conference about decommissioning and dismantling of Nuclear installations in the European Community. The first two papers give a detailed description of the legal, financial and regulatory framework of decommissioning and dismantling of nuclear facilities in the European Union and a review of the currently available decommissioning techniques for inventory, disassembly, decontamination, remote operations and management of wastes. Other papers describe some legal and technical aspects of reactor and plants dismantling in UK, Germany, Spain and France. (J.S.)

  3. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  4. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  5. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  6. Couples, contentious conversations, mobile telephone use and driving.

    Science.gov (United States)

    Lansdown, Terry C; Stephens, Amanda N

    2013-01-01

    Studies have shown that the inappropriate use of in-vehicle technology may lead to hazardous disruption of driver performance. This paper reports an investigation into the socio-technical implications of maintaining a difficult conversation while driving. Twenty romantically involved couples participated in a driving-simulator experiment. The participants engaged in emotionally difficult conversations while one partner drove. The contentious conversation topics were identified using a revealed differences protocol, requiring partners to discuss sources of ongoing disagreement in their relationship. The conversations were conducted either using handsfree telephone or with both parties present in the simulator. Results indicate that the revealed differences tasks were subjectively viewed as emotionally more difficult than a control. Driver performance was found to be adversely effected for both longitudinal and lateral vehicle control. Performance was worst during contentious conversations with the partner present, suggesting the drivers may be better able to regulate driving task demands with the partner not in the vehicle during difficult discussions. Copyright © 2012 Elsevier Ltd. All rights reserved.

  7. Analyzing online sentiment to predict telephone poll results.

    Science.gov (United States)

    Fu, King-wa; Chan, Chee-hon

    2013-09-01

    The telephone survey is a common social science research method for capturing public opinion, for example, an individual's values or attitudes, or the government's approval rating. However, reducing domestic landline usage, increasing nonresponse rate, and suffering from response bias of the interviewee's self-reported data pose methodological challenges to such an approach. Because of the labor cost of administration, a phone survey is often conducted on a biweekly or monthly basis, and therefore a daily reflection of public opinion is usually not available. Recently, online sentiment analysis of user-generated content has been deployed to predict public opinion and human behavior. However, its overall effectiveness remains uncertain. This study seeks to examine the temporal association between online sentiment reflected in social media content and phone survey poll results in Hong Kong. Specifically, it aims to find the extent to which online sentiment can predict phone survey results. Using autoregressive integrated moving average time-series analysis, this study suggested that online sentiment scores can lead phone survey results by about 8-15 days, and their correlation coefficients were about 0.16. The finding is significant to the study of social media in social science research, because it supports the conclusion that daily sentiment observed in social media content can serve as a leading predictor for phone survey results, keeping as much as 2 weeks ahead of the monthly announcement of opinion polls. We also discuss the practical and theoretical implications of this study.

  8. Video quality of 3G videophones for telephone cardiopulmonary resuscitation.

    Science.gov (United States)

    Tränkler, Uwe; Hagen, Oddvar; Horsch, Alexander

    2008-01-01

    We simulated a cardiopulmonary resuscitation (CPR) scene with a manikin and used two 3G videophones on the caller's side to transmit video to a laptop PC. Five observers (two doctors with experience in emergency medicine and three paramedics) evaluated the video. They judged whether the manikin was breathing and whether they would give advice for CPR; they also graded the confidence of their decision-making. Breathing was only visible from certain orientations of the videophones, at distances below 150 cm with good illumination and a still background. Since the phones produced a degradation in colours and shadows, detection of breathing mainly depended on moving contours. Low camera positioning produced better results than having the camera high up. Darkness, shaking of the camera and a moving background made detection of breathing almost impossible. The video from the two 3G videophones that were tested was of sufficient quality for telephone CPR provided that camera orientation, distance, illumination and background were carefully chosen. Thus it seems possible to use 3G videophones for emergency calls involving CPR. However, further studies on the required video quality in different scenarios are necessary.

  9. Microcomputer-assisted transmission of disaster data by cellular telephone.

    Science.gov (United States)

    Wigder, H N; Fligner, D J; Rivers, D; Hotch, D

    1989-01-01

    Voice communication of information during disasters is often inadequate. In particular, simultaneous transmission by multiple callers on the same frequency can result in blocked transmissions and miscommunications. In contrast, nonvoice transmission of data requires less time than does voice communication of the same data, and may be more accurate. We conducted a pilot study to test the feasibility of a microcomputer assisted communication (MAC) network linking the disaster scene and the command hospital. The radio chosen to transmit data from the field disaster site to the command hospital was a cellular telephone connected to the microcomputer by modem. Typed communications between the microcomputer operators enabled dialogue between the disaster site and the hospitals. A computer program using commercially available software (Symphony by Lotus, Inc.) was written to allow for data entry, data transmission, and reports. Patient data, including age, sex, severity of injury, identification number, major injuries, and hospital destination were successfully transmitted from the disaster site command post to the command hospital. This pilot test demonstrated the potential applicability of MAC for facilitating transmission of patient data during a disaster.

  10. Engineering Education Tool for Distance Telephone Traffic Learning Through Web

    Directory of Open Access Journals (Sweden)

    Leonimer Flávio de Melo

    2012-11-01

    Full Text Available This work subject focuses in distance learning (DL modality by the Internet. The use of calculators and simulators software introduces a high level of interactivity in DL systems, such as Matlab software proposed by using in this work. The use of efficient mathematical packages and hypermedia technologies opens the door to a new paradigm of teaching and learning in the dawn of this new millennium. The use of hypertext, graphics, animation, audio, video, efficient calculators and simulators incorporating artificial intelligence techniques and the advance in the broadband networks will pave the way to this new horizon. The contribution of this work, besides the Matlab Web integration, is the developing of an introductory course in traffic engineering in hypertext format. Also, calculators to the most employed expressions of traffic analysis were developed to the Matlab server environment. By the use of the telephone traffic calculator, the user inputs data on his or her Internet browser and the systems returns numerical data, graphics and tables in HTML pages. The system is also very useful for Professional traffic calculations, replacing with advantages the use of the traditional methods by means of static tables and graphics in paper format.

  11. Status of ACCULINNA beam line

    CERN Document Server

    Rodin, A M; Bogdanov, D D; Golovkov, M S; Fomichev, A S; Sidorchuk, S I; Slepnev, R S; Wolski, R; Ter-Akopian, G M; Oganessian, Yu T; Yukhimchuk, A A; Perevozchikov, V V; Vinogradov, Yu I; Grishenchkin, S K; Demin, A M; Zlatoustovskii, S V; Kuryakin, A V; Filchagin, S V; Ilkaev, R I

    2003-01-01

    The separator ACCULINNA was upgraded to achieve new experimental requirements. The beam line was extended by new ion-optical elements beyond the cyclotron hall. The new arrangements yield much better background conditions. The intensities of sup 6 He and sup 8 He radioactive beams produced in fragmentation of 35 A MeV sup 1 sup 1 B ions were increased up to a factor of 10. The upgraded beam line was used in experiments to study the sup 5 H resonance states populated in the t+t reaction. A cryogenic liquid tritium target was designed and installed at the separator beam line.

  12. Fuel followed control rod installation at AFRRI

    International Nuclear Information System (INIS)

    Moore, Mark; Owens, Chris; Forsbacka, Matt

    1992-01-01

    Fuel Followed Control Rods (FFCRs) were installed at the Armed Forces Radiobiology Research Institute's 1 MW TRIGA Reactor. The procedures for obtaining, shipping, and installing the FFCRs is described. As part of the FFCR installation, the transient rod drive was relocated. Core performance due to the addition of the fuel followed control rods is discussed. (author)

  13. Flat-plate solar collector - installation package

    Science.gov (United States)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  14. Telephone versus face-to-face interviewing for household drug use surveys.

    Science.gov (United States)

    Aquilino, W S

    1992-01-01

    This research investigated the use of telephone versus face-to-face interviewing to gather data on the use of tobacco, alcohol, and illicit drugs. Telephone and personal drug use surveys of the 18-34 year-old household population were conducted in the state of New Jersey in 1986-1987. Survey modes were compared in terms of unit and item nonresponse rates, sample coverage, and levels of self-reported drug use. Results showed that the telephone survey achieved response rates lower than the personal survey, but comparable to telephone surveys of less threatening topics. Item nonresponse to sensitive drug questions was lower by phone than with the self-administered answer sheets in the personal mode. The exclusion of households without telephones in the telephone survey is a potential source of bias, and may lead to underestimation of alcohol and drug use for minority populations. After controlling for telephone status, the telephone survey furnished significantly lower drug use estimates on several indicators than the personal survey, with the largest mode differences found for Blacks.

  15. 30 CFR 56.12069 - Lightning protection for telephone wires and ungrounded conductors.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Lightning protection for telephone wires and... NONMETAL MINES Electricity § 56.12069 Lightning protection for telephone wires and ungrounded conductors... lightning shall be equipped with suitable lightning arrestors of approved type within 100 feet of the point...

  16. 30 CFR 57.12069 - Lightning protection for telephone wires and ungrounded conductors.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Lightning protection for telephone wires and... AND NONMETAL MINES Electricity Surface Only § 57.12069 Lightning protection for telephone wires and... exposed to lightning shall be equipped with suitable lightning arrestors of approved type within 100 feet...

  17. 78 FR 53684 - Misuse of Internet Protocol (IP) Captioned Telephone Service; Telecommunications Relay Services...

    Science.gov (United States)

    2013-08-30

    ..., and during regular business hours at the FCC Reference Information Center, Portals II, 445 12th Street... and persons using end user telephone equipment, such as a standard phone, smartphone, or computer. 2... displayed on a captioned telephone device, a computer, or a smartphone. The service also provides captions...

  18. 76 FR 17965 - In the Matter of Certain Mobile Telephones and Wireless Communication Devices Featuring Digital...

    Science.gov (United States)

    2011-03-31

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 337-TA-703] In the Matter of Certain Mobile Telephones and Wireless Communication Devices Featuring Digital Cameras, and Components Thereof Notice of... for importation, and the sale within the United States after importation of certain mobile telephones...

  19. 75 FR 44282 - In the Matter of Certain Mobile Telephones and Wireless Communication Devices Featuring Digital...

    Science.gov (United States)

    2010-07-28

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 337-TA-703] In the Matter of Certain Mobile Telephones and Wireless Communication Devices Featuring Digital Cameras, and Components Thereof; Notice of... for importation, and the sale within the United States after importation of certain mobile telephones...

  20. Exploring Culture from a Distance: The Utility of Telephone Interviews in Qualitative Research

    Science.gov (United States)

    Lechuga, Vicente M.

    2012-01-01

    Qualitative studies that utilize telephone interviews, as a primary data collection mode, often are not discussed in the qualitative research literature. Data excerpts from a study that sought to understand the culture of for-profit universities are used to illustrate the types of data that can be garnered through telephone interviews. In…

  1. The Role of the Team in Managing Telephone Consultation in Dialectical Behavior Therapy: Three Case Examples

    Science.gov (United States)

    Koons, Cedar R.

    2011-01-01

    Standard, outpatient Dialectical Behavior Therapy (DBT) includes the provision of intersession telephone contact between the therapist and the client to reduce suicidal crisis behaviors, enhance skills generalization, and reduce alienation and conflict in the therapeutic relationship. Therapists providing telephone consultation need the help of…

  2. Persons with Alzheimer's Disease Make Phone Calls Independently Using a Computer-Aided Telephone System

    Science.gov (United States)

    Perilli, Viviana; Lancioni, Giulio E.; Singh, Nirbhay N.; O'Reilly, Mark F.; Sigafoos, Jeff; Cassano, Germana; Cordiano, Noemi; Pinto, Katia; Minervini, Mauro G.; Oliva, Doretta

    2012-01-01

    This study assessed whether four patients with a diagnosis of Alzheimer's disease could make independent phone calls via a computer-aided telephone system. The study was carried out according to a non-concurrent multiple baseline design across participants. All participants started with baseline during which the telephone system was not available,…

  3. Recruiting to Clinical Trials on the Telephone - a randomized controlled trial

    DEFF Research Database (Denmark)

    Foss, Kim Thestrup; Kjærgaard, Jesper; Stensballe, Lone Graff

    2016-01-01

    BACKGROUND: Informed consent is an essential element of clinical research. Obtaining consent, however, may be challenging. The use of the telephone for giving information and obtaining consent may be practical but little formal research has been done. METHODS: We examined the use of the telephone...

  4. Effects of a Mail and Telephone Intervention on Breast Health Behaviors

    Science.gov (United States)

    Bowen, Deborah J.; Powers, Diane

    2010-01-01

    This study evaluated a mail and telephone intervention to improve breast health behaviors while maintaining quality of life. Women recruited from the general public were randomized to a stepped-intensity intervention consisting of mailings, telephone calls, and counseling (if requested or appropriate given a woman's genetic risk for breast cancer)…

  5. Installation of the LHC experimental insertions

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the low-beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  6. INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the Low-Beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  7. Wind profiler installed in Antarctica

    Science.gov (United States)

    Balsley, B. B.; Carey, J.; Woodman, R. F.; Sarango, M.; Urbina, J.; Rodriguez, R.; Ragaini, E.

    A VHF (50 MHz) wind profiler was installed in Antarctica at the Peruvian Base “Machu Picchu” on King George Island from January 21 to 26. The wind profiler will provide a first look at atmospheric dynamics over the region.The profiler—the first of its kind in Antarctica—is a National Science Foundationsponsored cooperative project of the University of Colorado, the Geophysical Institute of Peru, the University of Piura (Peru), and the Peruvian Navy. This venture was also greatly facilitated by Peru's Comision Nacional de Asuntos Antartidos and Consejo Nacional de Ciencias y Tecnologia, with additional logis tics support provided by the Argentinean Navy and the Uruguayan Air Force.

  8. NEMP effects on domestic installation

    International Nuclear Information System (INIS)

    Braun, C.; Clemens, P.; Graf, W.; Guidi, P.; Schmidt, H.U.

    1985-01-01

    The measurements have been made in a building of a psychiatric clinic at Alzey/West Germany. The building has been chosen for the measuring campaign because it has its own electrical installation for mains current supply and emergency power supply, apart from systems of the other buildings. The two supply systems DONNERSBERG could be cut off completely from the other mains systems, so that coupling and feed experiments could be made without mains voltage. Current supply to the measuring systems was done by means of extension cables, or by batteries. The wiring for connection to the room circuits is parallel to the exterior wall, so that measurements could be done by using a frame antenna placed outside of the building parallel to the exterior wall. (orig./DG) [de

  9. Installation in the SPS tunnel

    CERN Multimedia

    1974-01-01

    The SPS tunnel is 6910 m in circumference and has a cross section of 4 m inner diameter. It is situated at an elevation of 400 m above sea level at a depth below the surface varying between 23 and 65 m. Its walls are lined with a concrete shell of about 30 cm thickness. See also 7410043X

  10. Intermittent pacemaker dysfunction caused by digital mobile telephones.

    Science.gov (United States)

    Naegeli, B; Osswald, S; Deola, M; Burkart, F

    1996-05-01

    This study was designed to evaluate possible interactions between digital mobile telephones and implanted pacemakers. Electromagnetic fields may interfere with normal pacemaker function. Development of bipolar sensing leads and modern noise filtering techniques have lessened this problem. However, it remains unclear whether these features also protect from high frequency noise arising from digital cellular phones. In 39 patients with an implanted pacemaker (14 dual-chamber [DDD], 8 atrial-synchronized ventricular-inhibited [VDD(R)] and 17 ventricular-inhibited [VVI(R)] pacemakers), four mobile phones with different levels of power output (2 and 8 W) were tested in the standby, dialing and operating mode. During continuous electrocardiographic monitoring, 672 tests were performed in each mode with the phones positioned over the pulse generator, the atrial and the ventricular electrode tip. The tests were carried out at different sensitivity settings and, where possible, in the unipolar and bipolar pacing modes as well. In 7 (18%) of 39 patients, a reproducible interference was induced during 26 (3.9%) of 672 tests with the operating phones in close proximity (phone and at maximal sensitivity of the pacemakers (maximal vs. nominal sensitivity, 6% vs. 1.8% positive test results, p = 0.009). When the bipolar and unipolar pacing modes were compared in the same patients, ventricular inhibition was induced only in the unipolar mode (12.5% positive test results, p = 0.0003). Digital mobile phones in close proximity to implanted pacemakers may cause intermittent pacemaker dysfunction with inappropriate ventricular tracking and potentially dangerous pacemaker inhibition.

  11. CFPL installs products pipeline with directional drilling

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland number-sign 70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line

  12. Transmission line capital costs

    International Nuclear Information System (INIS)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy's Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs

  13. Nurse-Initiated Telephone Follow Up after Ureteroscopic Stone Surgery.

    Science.gov (United States)

    Tackitt, Helen M; Eaton, Samuel H; Lentz, Aaron C

    2016-01-01

    This article presents findings of a quality improvement (QI) project using the DMAIC (define, measure, analyze, improve, and control) model designed to decrease the rate of emergency department (ED) visits and nurse advice line calls after ureteroscopic stone surgery. Results indicated that nurse-initiated follow- up phone calls can decrease ED visits.

  14. Safety assessment of RF and microwave radiation emitted by the mobile telephone base station (MTBS) in Malaysia: experience and challenge

    International Nuclear Information System (INIS)

    Roha Tukimin; Rozaimah Abd Rahim; Mohamad Amirul Nizam; Mohd Yusof Mohd Ali

    2007-01-01

    Non-ionising radiation (NIR) is known to be hazardous if the amount received is excessive. It is a fact that NIR, including extremely low frequency (ELF) electromagnetic fields, radiofrequency (RF) and microwave radiation can be found almost everywhere generated by both natural and man-made source. This is due to increase in demand for telecommunication and wireless technology which is become very important and as part of our lives. However, the widespread of the relevant technology contributed more NIR man-made sources exposure to the human. Due to public concern their potential of causing such health hazard, members of public and companies approached and request NIR Group of Nuclear Malaysia to carry out surveys and safety assessments of radiofrequency and microwave radiation emitted by the mobile telephone base station (MTBS) erected near the residential area or installed on the rooftop of the commercial building. Objective of the survey was to assess the presence of radiofrequency and microwave radiation and to identify radiation level which may lead to significant personnel exposure. Findings of the survey was compared to the standard guidelines issued by Malaysian Communication and Multimedia Commission (MCMC) and International Committee on Non-Ionising Radiation Protection (ICNIRP). This paper highlights the works that had been carried out by NIR Group of Nuclear Malaysia from 1997 to 2007. We will share the experience and challenge in carried out the NIR safety assessment at mobile telephone base station. Results of the assessment work will be used to develop non-ionising radiation database for future reference in Malaysia. (Author)

  15. Indigenous Architecture for Expeditionary Installations

    Science.gov (United States)

    2006-03-01

    engineers to choose from pre-established contract line items to custom-order buildings depending on the need. This process is quick and easy, often...extremely strong and capable of withstanding strong windstorms (Nabokov, 1989: 340). Like the Navajo, the Pima and Papago tribes also adapted their...CLTD values could not be found for the subject wall assemblies; therefore, a straight temperature difference was used. Furthermore, since the focus

  16. Weighting Strategies for Combining Data from Dual-Frame Telephone Surveys: Emerging Evidence from Australia

    Directory of Open Access Journals (Sweden)

    Baffour Bernard

    2016-09-01

    Full Text Available Until quite recently, telephone surveys have typically relied on landline telephone numbers. However, with the increasing popularity and affordability of mobile phones, there has been a surge in households that do not have landline connections. Additionally, there has been a decline in the response rates and population coverage of landline telephone surveys, creating a challenge to collecting representative social data. Dual-frame telephone surveys that use both landline and mobile phone sampling frames can overcome the incompleteness of landline-only telephone sampling. However, surveying mobile phone users introduces new complexities in sampling, nonresponse measurement and statistical weighting. This article examines these issues and illustrates the consequences of failing to include mobile-phone-only users in telephone surveys using data from Australia. Results show that there are significant differences in estimates of populations’ characteristics when using information solely from the landline or mobile telephone sample. These biases in the population estimates are significantly reduced when data from the mobile and landline samples are combined and appropriate dual-frame survey estimators are used. The optimal choice of a dual-frame estimation strategy depends on the availability of good-quality information that can account for the differential patterns of nonresponse by frame.

  17. Evaluating telephone follow-up of a mail survey of community pharmacies.

    Science.gov (United States)

    Westrick, Salisa C; Mount, Jeanine K

    2007-06-01

    Mail and telephone are commonly used modes of survey with pharmacists. Research conducted using general population surveys consistently describes mail surveys as being less expensive but yielding lower response rates than telephone surveys. However, findings obtained from the general population may not be generalizable to pharmacist surveys. This study evaluates the effectiveness of telephone follow-up of mail survey nonrespondents by comparing the 2 survey modes on response rates, cooperation rates, cost per sample unit, and cost per usable response and evaluating potential nonresponse bias in the context of immunization activities. A census mail survey of 1,143 Washington State community pharmacies and a follow-up telephone survey of 262 randomly selected mail survey nonrespondents were compared. Both surveys included the same 15 yes/no-type questions to ask respondents about their pharmacy's involvement in immunization activities. The mail survey yielded a response rate 1 of 26.7% and a cooperation rate 1 of 26.7%, compared with 83.6% and 87.8%, respectively, for the follow-up telephone survey. With respect to cost per sample unit, the mail survey was the least expensive option ($1.20). However, when comparing cost per usable response, the mail survey was the most expensive ($4.37), and the follow-up telephone survey without an advance notification was the least expensive ($1.99). Furthermore, results suggest the presence of nonresponse bias: compared with pharmacies participating in the follow-up telephone survey, pharmacies participating in the mail survey were more likely to be involved in in-house immunization services but less likely to be involved in outsourced services. The telephone survey achieved higher outcome rates with reduced cost per usable response. A telephone survey is a viable mode that holds promise in pharmacy practice research. Maximizing response rates and assessing potential nonresponse bias should be a standard practice among pharmacy

  18. Spectrometric assembly for portable installations

    International Nuclear Information System (INIS)

    Kluger, A.; Popescu, C.

    1997-01-01

    The components of the portable spectrometric assembly are: - the detecting probe with Na I(Tl) crystal and air-tight case of industrial type; - a microcomputer; - a unit of analogical processing of the signal from the detecting probe; - a single-channel analyzer with adjustable threshold; - commands and display module; - a source of high voltage; - an electrical supply battery. The device uses the method of gamma photons detection in energetic windows. Through theoretical and experimental studies carried out during the prototype development phase, the superiority of this method has been proved as compared with the installations which make use of the classical principle of photon integral detection. The achieved prototype has a basic program enabling the setting of all working parameters (measuring time, discriminating thresholds, discriminators operating conditions, etc.). Through the included interface RS232 it is possible to transmit the data to a more powerful computer in order to continually process the results. The spectrometric assembly, realized on the basis of micro-computers, can be used in a wide range of applications: measurement of thickness and erosion of walls and tubes, measurement of level in closed containers, of soil density, etc. The adjustment for specific application is performed only through a program modification. (authors)

  19. ALARA in European nuclear installations

    International Nuclear Information System (INIS)

    Lefaure, C.; Croft, J.; Pfeffer, W.; Zeevaert, T.

    1995-01-01

    For over a decade the Commission of the European Community has sponsored research projects on the development and practical implementation of the Optimization principle, or as it is often referred to, ALARA. These projects have given rise to a series of successful international Optimization training courses and have provided a significant input to the periodic European Seminars on Optimization, the last one of which took place in April 1993. This paper reviews the approaches to Optimization that have development within Europe and describes the areas of work in the current project. The on-going CEC research project addresses the problem of ALARA and internal exposures, and tries to define procedures for ALARA implementation, taking account of the perception of the hazard as well as the levels of probability of exposure. The relationships between ALARA and work management, and ALARA and decommissioning of installations appear to be other fruitful research areas. Finally, this paper introduces some software for using ALARA decision aiding techniques and databases containing feed back experience developed in Europe

  20. ALARA in European nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Lefaure, C. [CEPN, Fontenay-Aux-Roses (France); Croft, J. [NRPB, Chilton, Didcot (United Kingdom); Pfeffer, W. [GRS, Koeln (Germany); Zeevaert, T. [SCK/CEN, Mol (Belgium)

    1995-03-01

    For over a decade the Commission of the European Community has sponsored research projects on the development and practical implementation of the Optimization principle, or as it is often referred to, ALARA. These projects have given rise to a series of successful international Optimization training courses and have provided a significant input to the periodic European Seminars on Optimization, the last one of which took place in April 1993. This paper reviews the approaches to Optimization that have development within Europe and describes the areas of work in the current project. The on-going CEC research project addresses the problem of ALARA and internal exposures, and tries to define procedures for ALARA implementation, taking account of the perception of the hazard as well as the levels of probability of exposure. The relationships between ALARA and work management, and ALARA and decommissioning of installations appear to be other fruitful research areas. Finally, this paper introduces some software for using ALARA decision aiding techniques and databases containing feed back experience developed in Europe.

  1. ID Barrel installed in cryostat

    CERN Multimedia

    Apsimon, R.; Romaniouk, A.

    Wednesday 23rd August was a memorable day for the Inner Detector community as they witnessed the transport and installation of the central part of the inner detector (ID-barrel) into the ATLAS detector. Many members of the collaboration gathered to witness this moment at Point 1. After years of design, construction and commissioning, the outer two detectors (TRT and SCT) of the ID barrel were moved from the SR1 cleanroom to the ATLAS cavern. The barrel was moved across the car park from building 2175 to SX1. Although only a journey of about 100 metres, this required weeks of planning and some degree of luck as far as the weather was concerned. Accelerometers were fitted to the barrel to provide real-time monitoring and no values greater than 0.1 g were recorded, fully satisfying the transport specification for this extremely precise and fragile detector. Muriel, despite her fear of heights, bravely volunteered to keep a close eye on the detector. Swapping cranes to cross the entire parking lot, while Mur...

  2. [Screening for dementia using telephone interviews. An evaluation and reliability study of the Telephone Interview for Cognitive Status (TICS) in its modified German version].

    Science.gov (United States)

    Matrisch, M; Trampisch, U; Klaassen-Mielke, R; Pientka, L; Trampisch, H J; Thiem, U

    2012-04-01

    To assess cognitive impairment or dementia in epidemiologic studies using telephone interviews for data acquisition, valid, reliable and short instruments suitable for telephone administration are required. For the Telephone Interview for Cognitive Status (TICS) in its modified German version, the only instrument used in Germany so far, more data on reliability and practicability are needed. Participants were recruited in the offices of nine primary care physicians. Data from 197 participants (115 females, mean age 78.5±4.1 years) who were tested by telephone and in the office by means of the Mini-Mental State Examination (MMSE) were used for the evaluation. For assessing reliability, a group of 91 participants (55 females, mean age 78.1±4.1 years) was contacted twice during 30 days to be tested during a telephone interview by means of the TICS in its modified German version. The intraclass correlation coefficient (ICC), a measure of reliability, was 0.67 [95% confidence interval (CI): 0.53; 0.77]. The Bland-Altman plot did not reveal any relationship between the variability of the difference between repeated measures and the total amount of the measure. For the overall TICS score, no differences were found between repeated measurements. However, the tasks recall of the word list and counting backwards showed some improvement in the repeated tests. TICS and MMSE showed only moderate correlation, with a correlation coefficient of 0.48 (95% CI: 0.36; 0.58). TICS values were dependent on age and educational level of the person tested. The TICS in its modified German version appears to be of acceptable reliability for the assessment of cognitive impairment during a telephone interview. TICS values depend on age and educational level of the person tested. TICS and MMSE correlate only moderately.

  3. Emotional first aid for a suicide crisis: comparison between Telephonic hotline and internet.

    Science.gov (United States)

    Gilat, Itzhak; Shahar, Golan

    2007-01-01

    The telephone and the internet have become popular sources of psychological help in various types of distress, including a suicide crisis. To gain more insight into the unique features of these media, we compared characteristics of calls to three technologically mediated sources of help that are part of the volunteer-based Israeli Association for Emotional First Aid (ERAN): Telephonic hotline (n = 4426), personal chat (n = 373) and an asynchronous online support group (n = 954). Threats of suicide were much more frequent among participants in the asynchronous support group than the telephone and personal chat. These findings encourage further research into suicide-related interpersonal exchanges in asynchronous online support groups.

  4. Civilian protection and Britain's commercial nuclear installations

    International Nuclear Information System (INIS)

    1981-01-01

    The subject is treated as follows: initial conclusions (major nuclear attack on military installations; nuclear attack including civil nuclear targets; conventional attack on civil nuclear installations); nature of nuclear weapons explosions and power reactor releases (general; dose effects and biologically significant isotopes; nuclear weapon effects; effect of reactors and other fuel-cycle installations in a thermonuclear area; implications of reactor releases due to conventional attack, sabotage, civil disorder or major accident). (U.K.)

  5. Modern electrical installation for craft students

    CERN Document Server

    Scaddan, Brian

    2013-01-01

    Modern Electrical Installation for Craft Students, Volume 2, Third Edition discusses several topics concerning electrical installations. The book is comprised of eight chapters that deal with craft theory, associated subjects, and electrical industries. Chapter 1 covers inductors and inductance, while Chapter 2 tackles capacitors and capacitance. Chapter 3 deals with inductance and capacitance in installation work. The book also discusses cells, batteries, and transformers. The electrical industries, control and earthing, and testing are also dealt with. The last chapter discusses the basic el

  6. Automated installation for atomic emission determination of gold, silver and platinum group metals

    International Nuclear Information System (INIS)

    Zayakina, S.B.; Anoshin, G.N.; Gerasimov, P.A.; Smirnov, A.V.

    1999-01-01

    An automated installation for the direct atomic emission determination of silver, gold and platinum-group metals (Ru) in geological and geochemical materials with software for automated data acquisition and handling is designed and developed. The installation consists of a DFS-458 diffraction spectrograph, a MAES-10 multichannel analyzer of emission spectra, and a dual-jet plasmatron. A library of spectral lines of almost all elements excited in the dual-jet plasmatron is complied [ru

  7. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  8. Safety of nuclear installations in Slovakia

    International Nuclear Information System (INIS)

    1998-01-01

    In this part next aspects are described: (1) Site selection (Legislation related to site selection; Meeting criteria at Bohunice and Mochovce sites; International agreements); (2) Design preparation and construction (Designing and construction-relevant legislation; Nuclear installation project preparation of nuclear installation at Mochovce site); (3) Operation (Operator licensing procedure; Operation limits and conditions; Maintenance testing and control documentation for management and operation; Technical support of operation; Analysis of events at nuclear installations and Radioactive waste production); (4) Planned safety upgrading activities at nuclear installations

  9. 14 CFR 171.9 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric... a power distribution system or locally generated, with a supplemental standby system, if needed. (c...

  10. High Line

    DEFF Research Database (Denmark)

    Kiib, Hans

    2015-01-01

    At just over 10 meters above street level, the High Line extends three kilometers through three districts of Southwestern Manhattan in New York. It consists of simple steel construction, and previously served as an elevated rail line connection between Penn Station on 34th Street and the many....... The High Line project has been carried out as part of an open conversion strategy. The result is a remarkable urban architectural project, which works as a catalyst for the urban development of Western Manhattan. The greater project includes the restoration and reuse of many old industrial buildings...

  11. 47 CFR 36.331 - Information origination/termination expenses-Account 6310 (Class B telephone companies); Accounts...

    Science.gov (United States)

    2010-10-01

    ... telephone companies). (a) The expenses in this account are classified as follows: (1) Other Information... 47 Telecommunication 2 2010-10-01 2010-10-01 false Information origination/termination expenses-Account 6310 (Class B telephone companies); Accounts 6311, 6341, 6351, and 6362 (Class A telephone...

  12. Installation and commissioning of a cryogen distribution system for the TPS project

    Science.gov (United States)

    Tsai, H. H.; Hsiao, F. Z.; Li, H. C.; Lin, M. C.; Wang, C.; Liao, W. R.; Lin, T. F.; Chiou, W. S.; Chang, S. H.; Chuang, P. S. D.

    2016-07-01

    A cryogen distribution system was installed and commissioned to transfer liquid nitrogen (LN2) and liquid helium (LHe) from storage dewars to superconducting radio-frequency (SRF) cavities for the 3-GeV Taiwan Photon Source (TPS) project. The cryogen distribution system comprises one distribution valve box (DVB), four control valve boxes (CVB) and seven sections of multichannel transfer line (MCL). The DVB distributes the LHe and LN2 to the CVB, and then to the SRF cavities through independent vacuum-jacketed transfer lines. The vaporized GHe and GN2 from the cryomodules are collected via the MCL. The cryogen distribution system was installed and commissioned from October 2014 to the end of March 2015. This paper presents the installation, pre-commissioning and commissioning of the cryogen distribution system, and describes the heat load test. Thermal acoustic oscillation (TAO) was found in the GHe process line; this phenomenon and its solution are also presented and discussed.

  13. Counselor competence for telephone Motivation Interviewing addressing lifestyle change among Dutch older adults

    NARCIS (Netherlands)

    Mesters, I.; Keulen, H.M. van; Vries, H. de; Brug, J.

    2017-01-01

    Counselor competence in telephone Motivation Interviewing (MI) to change lifestyle behaviors in a primary care population was assessed using the Motivational Interviewing Treatment Integrity (MITI) rating system. Counselor behavior was evaluated by trained raters. Twenty minutes of a random sample

  14. Traffic Tech : National Telephone Survey on Distracted Driving Attitudes and Behaviors - 2015

    Science.gov (United States)

    2018-03-01

    The National Highway Traffic Safety Administration (NHTSA) conducted its third national telephone survey of distracted driving to monitor the public's attitudes, knowledge, and self-reported behavior about cell phone use and texting while driving, an...

  15. 78 FR 14701 - Misuse of Internet Protocol (IP) Captioned Telephone Service; Telecommunications Relay Services...

    Science.gov (United States)

    2013-03-07

    ...] Misuse of Internet Protocol (IP) Captioned Telephone Service; Telecommunications Relay Services and..., the information collection associated with the Commission's Misuse of Internet Protocol (IP) Captioned...- 2235075, or email [email protected] . SUPPLEMENTARY INFORMATION: This document announces that, on...

  16. Disclosure of Sexual Intercourse by Teenagers: Agreement Between Telephone Survey Responses and Annual Visit Disclosures

    Science.gov (United States)

    Alexander, Stewart C.; Fortenberry, J. Dennis; Pollak, Kathryn I.; Østbye, Truls; Bravender, Terrill; Tulsky, James A.; Dolor, Rowena; Shields, Cleveland G.

    2015-01-01

    Background Physicians can help guide teenagers in their emerging sexuality; however, teens rarely inform physicians about their sexual activity. Methods We audio-recorded annual visits between 365 teenagers and 49 physicians. sexual intercourse. Recordings were coded for teenage disclosures about previous sexual intercourse. We measured agreement between telephone survey responses and annual visit disclosures, and examined factors associated with agreement between the two. Results Fifty-six teenagers (15%) reported previous sexual intercourse in either the telephone survey or to their physician. Among those who reported sexual intercourse, 57% shared this information to both the telephone survey and their physician (κ = .72, confidence interval = 0.63–0.82). Conclusions Although a slight majority of teenagers disclosed their sexual activity to both the telephone survey and their doctor, a significant number disclosed to just one source. PMID:25857726

  17. Assisting the visually impaired to deal with telephone interview jobs using information and commutation technology.

    Science.gov (United States)

    Yeh, Fung-Huei; Yang, Chung-Chieh

    2014-12-01

    This study proposed a new information and commutation technology assisted blind telephone interview (ICT-ABTI) system to help visually impaired people to do telephone interview jobs as normal sighted people and create more diverse employment opportunities for them. The study also used an ABAB design to assess the system with seven visually impaired people. As the results, they can accomplish 3070 effective telephone interviews per month independently. The results also show that working performance of the visually impaired can be improved effectively with appropriate design of operation working flow and accessible software. The visually impaired become productive, lucrative, and self-sufficient by using ICT-ABTI system to do telephone interview jobs. The results were also shared through the APEC Digital Opportunity Center platform to help visually impaired in Philippines, Malaysia and China. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Epidemiological Safety Surveillance of Cellular Telephones in the US (invited paper)

    International Nuclear Information System (INIS)

    Dreyer, N.A.; Loughlin, J.E.; Rothman, K.J.

    1999-01-01

    In 1994 a surveillance programme was initiated to monitor the effects of exposure to the human head from radiofrequency waves, such as those emitted from handheld cellular telephones. Cellular carriers contributed information about 1.5 million telephone account holders, their phones and two months of data on minutes used and number of calls. Cellular telephone manufacturers provided data that allowed classification of phones as analogue or digital and a handheld or mobile (car or bag) for 67% of the phones. Thus far 1,021,767 individuals have been identified who had at least one active cellular telephone account in 1994 and/or 1995 and who used either a handheld (41%) or a mobile (59%) phone during the study period, but not both. Seventy-four per cent of the cohort had used their cellular phone for ≥2 years, and 30% for ≥3 years. (author)

  19. Organizational Contexts and Texts: The Redesign of the Midwest Bell Telephone Bill.

    Science.gov (United States)

    Keller-Cohen, Deborah

    1987-01-01

    Offers a retrospective view of organizational factors affecting the redesign of the Midwest Bell Telephone Bill. Shows how financial considerations, organizational time frame, and employee training and experience influenced the bill's development process. (MM)

  20. Feasibility of using cellular telephone data to determine the truckshed of intermodal facilities.

    Science.gov (United States)

    2010-03-01

    In order to determine the feasibility of using cellular telephone location data in deriving the geographic extent : (truckshed) from intermodal facilities, this study was conducted to determine the feasibility analysis in three aspects: : technology,...

  1. Nurse-led telephone follow-up after total knee arthroplasty

    DEFF Research Database (Denmark)

    Szöts, Kirsten; Konradsen, Hanne; Solgaard, Søren

    2015-01-01

    AIM AND OBJECTIVES: To generate information on how telephone follow-up consultations, structured by nursing status according to the VIPS-model, functioned after total knee arthroplasty. The objectives were to unfold the content of the telephone follow-ups according to the structure for nursing...... status and to explore the patients' views of the telephone follow-ups. BACKGROUND: The length of stay in hospital following total knee arthroplasty has fallen markedly, and patients now have to be responsible for their recovery from a very early stage. After discharge, patients may experience a variety...... Telephone follow-up was valued by total knee arthroplasties patients as representing a holistic approach and providing adequate information, counselling and support after discharge to home. Three categories were identified with regard to the patients' views: 'A means for reflection and provision of adequate...

  2. Voice-band Modem: A Device to Transmit Data over Telephone ...

    Indian Academy of Sciences (India)

    over Telephone Networks. 2. Advanced Ideas ... transmitted signal power and No is the noise power spec- ... power distribution over all frequencies, and the samples of noise .... Figure 3, dmin=2fl, and average signal energy, assum- ing that ...

  3. Initial fieldwork for LWAZI: a telephone-based spoken dialog system for rural South Africa

    CSIR Research Space (South Africa)

    Gumede, T

    2009-03-01

    Full Text Available government information and services. Our interviews, focus group discussions and surveys revealed that Lwazi, a telephone-based spoken dialog system, could greatly support current South African government efforts to effectively connect citizens to available...

  4. World lines.

    OpenAIRE

    Waser Jürgen; Fuchs Raphael; Ribicic Hrvoje; Schindler Benjamin; Blöschl Günther; Gröller Eduard

    2010-01-01

    In this paper we present World Lines as a novel interactive visualization that provides complete control over multiple heterogeneous simulation runs. In many application areas decisions can only be made by exploring alternative scenarios. The goal of the suggested approach is to support users in this decision making process. In this setting the data domain is extended to a set of alternative worlds where only one outcome will actually happen. World Lines integrate simulation visualization and...

  5. Gender portrayals in telephone books for gay community versus Pacific-Bell Yellow Pages.

    Science.gov (United States)

    Waugh, I M; Rienzi, B M

    1998-12-01

    Photographic images (N = 2,700) from three 1997 Pacific-Bell Yellow Pages (n = 1,976) and from three 1996-97 gay, lesbian, and bisexual community telephone books (n = 724) were classified into three groups by visible features (definite male, definite female, and gender nonspecific). The latter were excluded. The proportion of male photographic images was larger in gay community books than in Pacific-Bell telephone books.

  6. Emotion Analysis of Telephone Complaints from Customer Based on Affective Computing

    OpenAIRE

    Gong, Shuangping; Dai, Yonghui; Ji, Jun; Wang, Jinzhao; Sun, Hai

    2015-01-01

    Customer complaint has been the important feedback for modern enterprises to improve their product and service quality as well as the customer's loyalty. As one of the commonly used manners in customer complaint, telephone communication carries rich emotional information of speeches, which provides valuable resources for perceiving the customer's satisfaction and studying the complaint handling skills. This paper studies the characteristics of telephone complaint speeches and proposes an anal...

  7. 49 CFR 393.30 - Battery installation.

    Science.gov (United States)

    2010-10-01

    ... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY...

  8. Installation package for the Solaron solar subsystem

    Science.gov (United States)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  9. Data Acquisition System On Beta Installation

    International Nuclear Information System (INIS)

    Abtokhi, Ahmad; Nurhanan; Sudarno; Sumarno, Edy

    2000-01-01

    Data acquisition system is needed on every installation. This is important used to monitoring and processing data to get information desired. This system applied to β installation which is facility to carry out experiments on accident condition like as reflooding phenomena in test section. The 16 exp.th channel data acquisition system is drived by ADC 0804 and programme application DELPHI

  10. ATLAS semiconductor tracker installed into its barrel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The ATLAS silicon tracker is installed in the silicon tracker barrel. Absolute precision was required in this operation to ensure that the tracker was inserted without damage through minimal clearance. The installation was performed in a clean room on the CERN site so that no impurities in the air would contaminate the tracker's systems.

  11. Demographic characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    The selection of a nuclear installations sites can not be conceived without a deep analysis of demographic context. This analysis permits to define the critical populations around the installation and is an essential element of emergency plans. 1 tab., 2 refs. (F.M.)

  12. Using game engines in mixed reality installations

    NARCIS (Netherlands)

    Nakevska, M.; Vos, E.C.; Juarez, Alex; Hu, J.; Langereis, G.R.; Rauterberg, G.W.M.; Anacleto, J.; Fels, S.; Graham, N.; et al., xx

    2011-01-01

    In a mixed reality installation, a variety of technologies is integrated such as virtual reality, augmented reality, and animated virtual agents and robotic agents. One of the main challenges is how to design and implement a mixed reality installation that integrates a heterogeneous array of sensors

  13. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  14. Installation Service - Changes in opening hours

    CERN Multimedia

    GS Department

    2010-01-01

    For organizational matters, please note that, as from 15 March 2010, the Installation Service will have wen opening hours. The new schedule will be from 14:00 to 17:00 (Monday to Friday). Contact persons are: Martine Briant, Karine Robert and Claudia Bruggmann. The office address remains 73-3-014. Installation Service

  15. Telephone Crisis Support Workers' Intentions to Use Recommended Skills While Experiencing Functional Impairment.

    Science.gov (United States)

    Kitchingman, Taneile A; Wilson, Coralie J; Woodward, Alan; Caputi, Peter; Wilson, Ian

    2018-05-01

    Empathic engagement with distressed others can lead to elevated symptoms of psychological distress and functional impairment, which preclude helping professionals' delivery of optimal patient care. Whether telephone crisis support workers are impacted in a similar way is not currently reported in the literature. This study examined the relationship between functional impairment and intentions to use recommended support skills in a representative national sample of 210 telephone crisis support workers. Participants completed an online survey including measures of functional impairment and intentions to use recommended telephone crisis support skills with callers reporting suicidal ideation, symptoms of depression, and anxiety. As a group, participants who experienced greater functional impairment during the past month reported significantly lower intentions to use recommended support skills with callers than those who reported lower functional impairment. Future research is needed to clarify the extent to which results generalize to telephone crisis support workers from other organizations. Results warrant further research to (a) identify determinants of telephone crisis support workers' functional impairment, and (b) for the deliberate management of telephone crisis support workers' functional impairment through developing and/or modifying existing service strategies to optimize workers' psychological well-being and delivery of support to callers.

  16. Validation of a brief telephone battery for neurocognitive assessment of patients with pulmonary arterial hypertension

    Directory of Open Access Journals (Sweden)

    Palevsky Harold I

    2005-04-01

    Full Text Available Abstract Background The effects of pulmonary arterial hypertension on brain function are not understood, despite patients' frequent complaints of cognitive difficulties. Using clinical instruments normally administered during standard in-person assessment of neurocognitive function in adults, we assembled a battery of tests designed for administration over the telephone. The purpose was to improve patient participation, facilitate repeated test administration, and reduce the cost of research on the neuropsychological consequences of acute and chronic cardiorespiratory diseases. We undertook this study to validate telephone administration of the tests. Methods 23 adults with pulmonary arterial hypertension underwent neurocognitive assessment using both standard in-person and telephone test administration, and the results of the two methods compared using interclass correlations. Results For most of the tests in the battery, scores from the telephone assessment correlated strongly with those obtained by in-person administration of the same tests. Interclass correlations between 0.5 and 0.8 were observed for tests that assessed attention, memory, concentration/working memory, reasoning, and language/crystallized intelligence (p ≤ 0.05 for each. Interclass correlations for the Hayling Sentence Completion test of executive function approached significance (p = 0.09. All telephone tests were completed within one hour. Conclusion Administration of this neurocognitive test battery by telephone should facilitate assessment of neuropsychological deficits among patients with pulmonary arterial hypertension living across broad geographical areas, and may be useful for monitoring changes in neurocognitive function in response to PAH-specific therapy or disease progression.

  17. Comparing online and telephone survey results in the context of a skin cancer prevention campaign evaluation.

    Science.gov (United States)

    Hollier, L P; Pettigrew, S; Slevin, T; Strickland, M; Minto, C

    2017-03-01

    A large proportion of health promotion campaign evaluation research has historically been conducted via telephone surveys. However, there are concerns about the continued viability of this form of surveying in providing relevant and representative data. Online surveys are an increasingly popular alternative, and as such there is a need to assess the comparability between data collected using the two different methods to determine the implications for longitudinal comparisons. The present study compared these survey modes in the context of health promotion evaluation research. Data were collected via computer-assisted telephone interviewing and an online panel. In total, 688 and 606 respondents aged between 14 and 45 years completed the online and telephone surveys, respectively. Online respondents demonstrated higher awareness of the advertisement, rated the advertisement as more personally relevant and had better behavioural outcomes compared with the telephone respondents. The results indicate significant differences between the telephone and online surveys on most measures used to assess the effectiveness of a health promotion advertising campaign. Health promotion practitioners could consider the combination of both methods to overcome the deterioration in telephone survey response rates and the likely differences in respondent outcomes. © The Author 2016. Published by Oxford University Press on behalf of Faculty of Public Health. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  18. Effects of enterostomal nurse telephone follow-up on postoperative adjustment of discharged colostomy patients.

    Science.gov (United States)

    Zhang, Jun-e; Wong, Frances Kam Yuet; You, Li-ming; Zheng, Mei-chun; Li, Qiong; Zhang, Bing-yan; Huang, Man-rong; Ye, Xin-Mei; Liang, Ming-juan; Liu, Jin-ling

    2013-01-01

    People with a new colostomy encounter many difficulties as they struggle to adjust to their ostomies. Nurse telephone follow-up is a convenient way to ensure continuity of care. There is a paucity of studies testing if nurse telephone follow-up can enhance adjustment of postdischarged colostomy patients. The purpose of this study was to evaluate the effect of enterostomal nurse telephone follow-up on the adjustment levels of discharged colostomy patients. This was a randomized controlled trial. Participants (n = 103) who had undergone colostomy operations in China were recruited and randomly assigned to the study or control group. Both the study and control groups received routine discharge care, whereas the study group received 2-3 nurse telephone calls in the follow-up period. The outcome measures included Ostomy Adjustment Scale, Stoma Self-efficacy Scale, satisfaction with care, and stoma complications. Results of this study indicated that participants in the study group had significantly better ostomy adjustment, higher stoma self-efficacy, higher satisfaction with care, and less stoma complications compared with those in the control group. This study provided evidence to support that enterostomal nurse telephone follow-up can improve patient ostomy adjustment level and other related outcomes. Nurse telephone follow-up is an effective intervention to support the adjustment of stoma patients after hospital discharge.

  19. Telephone based cognitive-behavioral screening for frontotemporal changes in patients with amyotrophic lateral sclerosis (ALS).

    Science.gov (United States)

    Christodoulou, Georgia; Gennings, Chris; Hupf, Jonathan; Factor-Litvak, Pam; Murphy, Jennifer; Goetz, Raymond R; Mitsumoto, Hiroshi

    Our objective was to establish a valid and reliable battery of measures to evaluate frontotemporal dementia (FTD) in patients with ALS over the telephone. Thirty-one subjects were administered either in-person or by telephone-based screening followed by the opposite mode of testing two weeks later, using a modified version of the UCSF Cognitive Screening Battery. Equivalence testing was performed for in-person and telephone based tests. The standard ALS Cognitive Behavioral Screen (ALS-CBS) showed statistical equivalence at the 5% significance level compared to a revised phone version of the ALS-CBS. In addition, the Controlled Oral Word Association Test (COWAT) and Center for Neurologic Study-Lability Scale (CNS-LS) were also found to be equivalent at the 5% and 10% significance level, respectively. Similarly, the Mini-Mental State Examination (MMSE) and the well-established Telephone Interview for Cognitive Status (TICS) were also statistically equivalent. Equivalence could not be claimed for the ALS-Frontal Behavioral Inventory (ALS-FBI) caregiver interview and the Written Verbal Fluency Index (WVFI). In conclusion, our study suggests that telephone-based versions of the ALS-CBS, COWAT, and CNS-LS may offer clinicians valid tools to detect frontotemporal changes in the ALS population. Development of telephone based cognitive testing for ALS could become an integral resource for population based research in the future.

  20. Public perception of nuclear installations

    International Nuclear Information System (INIS)

    Kiipper, Felipe de Moura

    2011-01-01

    The key for nuclear renaissance is public acceptance. Facing energetic needs that occur around the world and lack of resources, the work of characterizing and proposing new models to represent public opinion is extremely important to all stakeholders. Even though public opinion's study on risks is relatively recent, may approaches of this subject have been suggested and presented, especially for the topic of perceptions on nuclear installations. Actual definitions on risk exist between objective and subjective models, that reflect opinions of lay public and experts. Strategies on communications with the public may be evaluated from many developed models, and its results may be registered. The use of structural models may present an exploratory character as well as confirmatory theories, as an adequate tool for the development of studies on public perception. In this work, a structural model is presented from data obtained in a previous report, and added to data collected before and after the Fukushima nuclear accident, in Japan. The effects developed from this accident offered a unique opportunity to study public opinion through the effects of a serious nuclear accident and its effects on risk communications. Aside, this work attempted to check the structural model according with obtained results, in order to sustain a constant improvement of the working tools. Yet, a comparison between data according to experts' respondents and lay public ones as well as a comparison among different students before and after a visit to nuclear station is considered. Obtained data for the structural models has been applied for on a structural model and analyzed by structural correlation matrix, latent variable structural coefficients and R 2 values. Results indicate that public opinion maintains its rejection on nuclear energy and the perception of benefits, facing perceived risks before the accident, has diminished. A new model that included a latent variable for corresponding

  1. Seismic qualification of existing nuclear installations in India - a proposal

    International Nuclear Information System (INIS)

    Basu, P.C.

    2001-01-01

    In India, the work toward seismic qualification of existing nuclear facilities has been started. Preliminary work is being undertaken with respect to identifying the facilities which would be taken up for seismic qualification, approach and methodology for re-evaluation for seismic safety, acceptance criteria, etc. Work has also been started for framing up the criteria and methodology of the seismic qualification of these facilities. Present paper contains the proposal in this respect. This proposal is on similar lines of the present practice of seismic qualification of NPP, as summarized in the Appendix, but has been modified to suit the special requirements of Indian nuclear installations. (author)

  2. 49 CFR 192.719 - Transmission lines: Testing of repairs.

    Science.gov (United States)

    2010-10-01

    ... pipe before it is installed. (b) Testing of repairs made by welding. Each repair made by welding in... 49 Transportation 3 2010-10-01 2010-10-01 false Transmission lines: Testing of repairs. 192.719... Transmission lines: Testing of repairs. (a) Testing of replacement pipe. If a segment of transmission line is...

  3. 14 CFR 23.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 23.993... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components § 23.993 Fuel system lines and fittings. (a) Each fuel line must be installed...

  4. 14 CFR 25.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System Components § 25.993 Fuel system lines and fittings. (a) Each fuel line must be installed and supported to prevent excessive... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 25.993...

  5. 14 CFR 27.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System Components § 27.993 Fuel system lines and fittings. (a) Each fuel line must be installed and supported to prevent excessive... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 27.993...

  6. 14 CFR 29.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System Components § 29.993 Fuel system lines and fittings. (a) Each fuel line must be installed and supported to prevent excessive... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 29.993...

  7. 49 CFR 192.375 - Service lines: Plastic.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Service lines: Plastic. 192.375 Section 192.375... § 192.375 Service lines: Plastic. (a) Each plastic service line outside a building must be installed... terminate above ground level and outside the building, if— (i) The above ground level part of the plastic...

  8. 49 CFR 192.377 - Service lines: Copper.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Service lines: Copper. 192.377 Section 192.377 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... § 192.377 Service lines: Copper. Each copper service line installed within a building must be protected...

  9. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    There is a great politically will to expand the green energy market in these times. A proven green technology is wind turbines. Wind turbines have been installed in great numbers on land over the last decades. However, the current development in wind turbine design leads to larger turbine sizes...... in order to reduce the cost of energy. This limits the on land application due to transportation limitations and unwillingness from prospect neighbours. Thus, offshore wind energy started developing over the last couple of years. Although installing the wind turbines offshore resolves the before men tioned...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation...

  10. Efficacy and experiences of telephone counselling for informal carers of people with dementia.

    Science.gov (United States)

    Lins, Sabine; Hayder-Beichel, Daniela; Rücker, Gerta; Motschall, Edith; Antes, Gerd; Meyer, Gabriele; Langer, Gero

    2014-09-01

    Informal carers of people with dementia can suffer from depressive symptoms, emotional distress and other physiological, social and financial consequences. This review focuses on three main objectives:To:1) produce a quantitative review of the efficacy of telephone counselling for informal carers of people with dementia;2) synthesize qualitative studies to explore carers' experiences of receiving telephone counselling and counsellors' experiences of conducting telephone counselling; and3) integrate 1) and 2) to identify aspects of the intervention that are valued and work well, and those interventional components that should be improved or redesigned. The Cochrane Dementia and Cognitive Improvement Group's Specialized Register, The Cochrane Library, MEDLINE, MEDLINE in Process, EMBASE, CINAHL, PSYNDEX, PsycINFO, Web of Science, DIMDI databases, Springer database, Science direct and trial registers were searched on 3 May 2011 and updated on 25 February 2013. A Forward Citation search was conducted for included studies in Web of Science and Google Scholar. We used the Related Articles service of PubMed for included studies, contacted experts and hand-searched abstracts of five congresses. Randomised controlled trials (RCTs) or cross-over trials that compared telephone counselling for informal carers of people with dementia against no treatment, usual care or friendly calls for chatting were included evaluation of efficacy. Qualitative studies with qualitative methods of data collection and analysis were also included to address experiences with telephone counselling. Two authors independently screened articles for inclusion criteria, extracted data and assessed the quantitative trials with the Cochrane 'Risk of bias' tool and the qualitative studies with the Critical Appraisal Skills Program (CASP) tool. The authors conducted meta-analyses, but reported some results in narrative form due to clinical heterogeneity. The authors synthesised the qualitative data and

  11. Cooltel'prep: preliminary study on the potential of geothermal cooling for mobile telephone relays; COOLTEL'PREP: etude preliminaire du potentiel de rafraichissement geothermique pour les relais de telephonie mobile

    Energy Technology Data Exchange (ETDEWEB)

    Lachal, B.; Hollmuller, P. [Centre Universitaire d' Etude des Problemes de l' Energie (CUEPE), University of Geneva, Geneva (Switzerland); Pahud, D. [Scuola Universitaria Professionale della Svizzera Italiana (SUPSI), Dipartimento Costruzioni e Territorio (DCT), Lugano (Switzerland); Gauman, A. [ENERGECO, Le Lignon - Geneva (Switzerland)

    2003-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary study carried out on the possibilities of using geothermal probes for the cooling of the electronics used in mobile telephone relay stations and thus help save electrical energy. Topics covered include the information delivered and the estimates made by mobile telephone operators, the requirements placed on a possible geothermal cooling system and experience already gained in this area in Sweden. Two variants are looked at: vertical borehole heat-exchangers and horizontal heat exchangers laid in trenches that have to be dug anyway. The conclusions made by the authors are presented: They are of the opinion that the cooling loads to be expected do not justify in-depth studies. The realisation of one or two pilot installations - possibly with heat-exchangers buried in cable trenches - is recommended, however.

  12. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    International Nuclear Information System (INIS)

    Robinson, Sharon M.; Jubin, Robert Thomas; Patton, Bradley D.; Sullivan, Nicholas M.; Bugbee, Kathy P.

    2009-01-01

    the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES and H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

  13. Silver linings.

    Science.gov (United States)

    Bultas, Margaret W; Pohlman, Shawn

    2014-01-01

    The purpose of this interpretive phenomenological study was to gain a better understanding of the experiences of 11 mothers of preschool children with autism spectrum disorder (ASD). Mothers were interviewed three times over a 6 week period. Interviews were analyzed using interpretive methods. This manuscript highlights one particular theme-a positive perspective mothers described as the "silver lining." This "silver lining" represents optimism despite the adversities associated with parenting a child with ASD. A deeper understanding of this side of mothering children with ASD may help health care providers improve rapport, communication, and result in more authentic family centered care. Copyright © 2014 Elsevier Inc. All rights reserved.

  14. Installation, testing and first results of TEXTOR's new ICRH system

    International Nuclear Information System (INIS)

    Durodie, F.; Delvigne, T.; Descamps, P.; Koch, R.; Ongena, J.; Vandenplas, P.E.; Van Nieuwenhove, R.; Van Oost, G.; Weynants, R.R.; Shen, X.M.; Ecole Royale Militaire, Brussels; Messiaen, A.M.; Ecole Royale Militaire, Brussels; Huetteman, P.; Kohlhaas, W.; Stickelman, C.; Cosler, A.

    1989-01-01

    The new ICRH system for TEXTOR, presented at the previous SOFT conference, has been tested and installed during spring and summer of 1987. Pulses of up to 2.8 MW have been achieved representing a power density at the antenna of about 3.1 MW/m 2 and over 90% of the installed RF power. Taking into account the already achieved volttages in the system one could extrapolate that a power density of 10 MW/m 2 with an transmission efficiency well over 90% would be technically feasible. First results, such as the interesting property that, in contrast with other experiments, the two antennae in each pair operate with zero and with π phase difference with nearly the same coupling efficiency, are discussed. The testing and conditioning procedures are described. RF-leak problems encounterd at the behinning of the experimental phase are discussed. Antenna and transmission line diagnostics as well as related tuning procedures are also described. During the installation of the neutral beam injectors, from beginning of April to about end of August 1988, several modifications to the whole of the ICRH system are being implemented. (author). 5 refs.; 6 figs.; 1 tab

  15. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  16. A novel method for coiled tubing installation

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Peter J. [2H Offshore, Houston, TX (United States); Tibbetts, David [Aquactic Engineering and Construction Ltd., Aberdeen (United Kingdom)

    2009-12-19

    Installation of flexible pipe for offshore developments is costly due to the physical cost of the flexible pipe, expensive day rates and the availability of suitable installation vessels. Considering the scarcity of flexible pipe in today's increasingly demanding and busy market, operators are seeking a cost effective solution for installing piping in a range of water depths using vessels which are readily on hand. This paper describes a novel approach to installing reeled coiled tubing, from 1 inch to 5 inch diameter, from the back of a small vessel in water depths from 40 m up to around 1000 m. The uniqueness of the system is the fact that the equipment design is modular and compact. This means that when disassembled, it fits into standard 40 ft shipping containers, and the size allows it to be installed on even relatively small vessels of opportunity, such as anchor handling or installation vessels, from smaller, and cheaper quay side locations. Such an approach is the ideal solution to the problem faced by operators, in that it allows the installation of cheaper, readily available coiled tubing, from cost-effective vessels, which do not need to transit to a pick up the system. (author)

  17. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  18. Preliminary installment of total picture archiving and communication systems

    International Nuclear Information System (INIS)

    Takenaka, E.; Takanashi, S.; Suda, Y.; Furui, S.; Yoshida, H.; Hosaka, Y.; Fukui, T.

    1990-01-01

    This paper studied the image quality of various medical digital images and to install a small but total image management and communication system to file images. The system consists of a filing system with a laser scanning digitizer (2,000 x 2,000 x 8 bits), an optical disk (3.8 GB), two HD CRTs, and a 1.6 GB magnetic disk. This system can file on-line the images from a second filing system with FCR (on-line) and a Konica direct imaging system during treatment and follow-up, a CCD TV simulator system for a remote after-loading system, a dose map on CT and MR images through a self-made treatment planning system on the PC level, a CCD TV (RGB) system for local lesions, and portal images, through the imaging plate, for brachytherapy

  19. Improving Posthospital Discharge Telephone Reach Rates Through Prehospital Discharge Face-to-Face Meetings.

    Science.gov (United States)

    Vergara, Franz H; Sheridan, Daniel J; Sullivan, Nancy J; Budhathoki, Chakra

    The purpose of this study was to determine whether a face-to-face meeting with patients by a telephonic case manager prehospital discharge would result in increased telephone follow-up (TFU) reach rates posthospital discharge. Acute care adult medicine inpatient units. A quasiexperimental design was utilized. Two adult inpatient medicine units were selected as the intervention and comparison groups. The framework of the study is the transitions theory. A convenience sampling technique was used, whereby 88 eligible patients on the intervention unit received face-to-face meetings prehospital discharge whereas 123 patients on the comparison unit received standard care (no face-to-face meetings). Cross-tabulation and chi-square tests were employed to examine the association of face-to-face meeting intervention and TFU reach rates. Implementing brief (face-to-face meetings by a telephonic case manager prehospital discharge resulted in a TFU reach rate of 87% on the intervention unit, whereas the comparison unit only had a 58% TFU reach rate (p communication with more patients posthospital discharge. A brief prehospital discharge face-to-face meeting with patients assisted them to understand the reasons for a posthospital discharge telephone call, identified the best times to call using accurate telephone numbers, and taught patients how best to prepare for the call. In addition, by meeting patients face-to-face, the telephonic case manager was no longer an unknown person on the telephone asking them questions about their medical condition. These factors combined may have significantly helped to increase TFU reach rates.

  20. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  1. Seismic studies for nuclear installations sites

    International Nuclear Information System (INIS)

    Mohammadioun, B.; Faure, J.

    1988-01-01

    The french experience in seismic risks assessment for french nuclear installations permits to set out the objectives, the phases the geographic extensions of workings to be realized for the installation safety. The data to be collected for the safety analysis are specified, they concern the regional seismotectonics, the essential seismic data for determining the seism level to be taken into account and defining the soil movement spectra adapted to the site. It is necessary to follow up the seismic surveillance during the installation construction and life. 7 refs. (F.M.)

  2. Risk assessment techniques for industrial installations

    International Nuclear Information System (INIS)

    Croitoru, C.; Dumitrescu, M.; Preda, I.; Stefanescu, I.; Titescu, G.

    1995-01-01

    This paper presents a risk analysis which concerns the following stages: identification of the initiation events, evaluation of the occurrence frequency of different accident sequences, assessment of human, economical, and environmental consequences, risk assessment and management. The study of the accident sequences subsequent to an initiation event was achieved by the event tree method. Also, there were developed methods based on mathematical models of installations which take into account reliability data, data concerning the exploitation history, and data referring to the human factor effects in the installation operation. These methods were used for the determination of occurrence frequencies of hydrogen sulfide emission accidents in the heavy water production installations

  3. Installation for producing sealed radioactive sources

    International Nuclear Information System (INIS)

    Fradin, J.; Hayoun, C.

    1969-01-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [fr

  4. Installation of deep water sub-sea equipment

    Energy Technology Data Exchange (ETDEWEB)

    Pollack, Jack; Demian, Nabil [SBM-IMODCO Inc., Houston, TX (UNited States)

    2004-07-01

    Offshore oil developments are being planned in water depths exceeding 2000 m. Lowering and positioning large, heavy sub sea hardware, using conventional methods, presents new technical challenges in these ultra deep waters. In 3000 m a safe lift using conventional steel cables will require more capacity to support the cable self weight than the static payload. Adding dynamic loads caused by the motions of the surface vessel can quickly cause the safe capacity of the wire to be exceeded. Synthetic ropes now exist to greatly reduce the lowering line weight. The lower stiffness of these synthetic ropes aggravate the dynamic line tensions due to vessel motions and relatively little is known about the interaction of these ropes on the winches and sheaves required for pay-out and haul-in of these lines under dynamic load. Usage of conventional winches would damage the synthetic rope and risk the hardware being deployed. Reliable and economic installation systems that can operate from existing installation vessels are considered vital for ultra deep-water oil development. The paper describes a Deep Water Sub-Sea Hardware Deployment system consisting of a buoy with variable, pressure-balanced buoyancy, which is used to offset most of the payload weight as it is lowered. The buoyant capacity is controlled by air pumped into the tank from the surface vessel through a reinforced hose. The buoy and payload motion are isolated from the deployment line surface dynamics using a simple passive heave compensator mounted between the buoy and the bottom of the deployment rope. The system components, functionality and dynamic behavior are presented in the paper. (author)

  5. Management of procurement activities in a nuclear installation

    International Nuclear Information System (INIS)

    1996-12-01

    Discussions held within the framework of IAEA regional technical co-operation projects implemented in the Latin America, Asia-Pacific and eastern Europe regions revealed an area of frequent difficulties related to the proper control, by the management of nuclear utilities, of the effective fulfilment of contractual quality and safety requirements. Evaluation of the results of a number of OSART missions has also pointed to a need for improving the control that some utilities exercise on their suppliers. The IAEA was thus prompted to initiate the development of a technical document providing guidance on these subjects. In October 1995, a consultants meeting was convened to determine the target users of the technical document and to develop the scope, contents, structure and the reference material. A first draft was then prepared. An Advisory Group meeting consisting of experts from 17 Members States was held in Vienna in May 1996 to review and complete the draft. The technical document is intended to provide practical guidance on controlling procurement, with supporting information for senior management, line managers and line supervisors in a nuclear installation. Although the guidance is structured to address the needs during the operating stage of a nuclear power plant, much of the material is also applicable to the construction and decommissioning stages and to other nuclear installations. 1 fig

  6. Fast polarizers installation for ECRH and ECE in TCV

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Miguel, E-mail: miguel.silva@epfl.ch [Ecole Polytechnique Federale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas (CRPP), Association EURATOM-Confederation Suisse, CH-1015 Lausanne (Switzerland); Goodman, Timothy; Felici, Federico; Porte, Laurie [Ecole Polytechnique Federale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas (CRPP), Association EURATOM-Confederation Suisse, CH-1015 Lausanne (Switzerland)

    2011-10-15

    We report on the installation of fast polarizers for ECRH injection and ECE diagnostics, in the TCV tokamak. The main goal is to change the polarization during a plasma shot and react to changing conditions such as: plasma current and position, ECRH injection angles as well as ECE oblique observation angle and correlation ECE frequency. This will allow tracking of plasma variations, find optimum parameters to maximize ECRH absorption and improve the quality and consistency of ECE measurements. The polarization is varied using two fast polarizers, from General Atomics, positioned either in the evacuated transmission line for ECRH, or in a similar non-evacuated line near a real-time moveable directional antenna for ECE. A programmable driver is used to control a servo-motor and allows three operation modes during a plasma shot: fixed angle position, pre-programmed reference waveform and following of a real-time reference waveform. Preliminary tests of the motor controller achieved an 8 Hz bandwidth for a {+-}4{sup o} amplitude motion and a 2.2 Hz bandwidth for a {+-}4{sup o} amplitude motion. The fast polarizers are presently in the ECE system and the control hardware is being installed.

  7. RF accelerating unit installed in the PSB

    CERN Multimedia

    CERN PhotoLab

    1972-01-01

    RF accelerating unit installed in the PSB ring between two bending magnets. Cool air from a heat exchanger is injected into the four cavities from the central feeder and the hot air recirculated via the lateral ducts.

  8. Decommissioning and dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Pelzer, N.

    1993-01-01

    The German law governing decommissioning and dismantling of nuclear installations can be called to be embryonic as compared to other areas of the nuclear regulatory system, and this is why the AIDN/INLA regional meeting organised by the German national committee in July 1992 in Schwerin has been intended to elaborate an assessment of the current legal situation and on this basis establish proposals for enhancement and development, taking into account the experience reported by experts from abroad. The proceedings comprise the paper of the opening session, 'Engineering and safety aspects of the decommissioning of nuclear installations', and the papers and discussions of the technical sessions entitled: - Comparative assessment of the regulatory regimes. - Legislation governing the decommissioning of nuclear installations in Germany. - Analysis of the purpose and law making substance of existing regulatory provisions for the decommissioning of nuclear installations. All seventeen papers of the meeting have been prepared for separate retrieval from the database. (orig./HSCH) [de

  9. Culture safety in the nuclear installation

    International Nuclear Information System (INIS)

    Benar Bukit

    2008-01-01

    Culture safety is aimed to empower all the personnel to contribute and responsible to the installation safety where they work in. Culture safety is important as there were so many accidents happened due to the little attention given to the safety, take as examples of what happened in Three Mille Island installation (1979) and Chernobyl (1986). These remind us that human factor gives a significant contribution to the failure of operational system which influences the safety. Therefore, as one of institutions which has nuclear installation. National Nuclear Energy Agency must apply the culture safety to guarantee the safety operation of nuclear installation to protect the personnel, community and environment from the hazard of radioactive radiation. Culture safety has two main components. The first component under the management responsibility is a framework needed in an organisation. The second component is the personnel attitude in al/ levels to respond and optimize those framework. (author)

  10. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C. [and others

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs.

  11. Notes on LED Installations in Street Illumination

    Directory of Open Access Journals (Sweden)

    Elisabeta Spunei

    2014-09-01

    Full Text Available The paper presents a study made on choosing LED street lighting installations, such that the quality requirements for exterior artificial lighting are fulfilled. We analyze two types of LED street lighting installations from a technical point of view, together with lighting level and brightness values obtained during the measurements. Following on the field measurements, the lighting quality parameters are calculated, and, for the lighting installation with the best performance, optimal mounting suggestions are made. The optimal quality parameters are calculated by simulations using the Dialux software. The same software and the same light sources we also compute an optimal street lighting by determining the size of the installation that provides the best lighting parameter values.

  12. Radioelement gauges. Appliances intended for permanent installation

    International Nuclear Information System (INIS)

    1975-08-01

    The present norm defines for radioelement gauges intended for permanent installation: a classification of instruments and beam shutter devices; recommended construction techniques which satisfy health physics requirements; monitoring and test methods; information which must appear on the instruments [fr

  13. Design, fabrication and installation of irradiation facilities

    International Nuclear Information System (INIS)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C.

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs

  14. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects......; Transforming materiality; Adding virtual objects; 3D effects; Complex content on simple objects or simple content on complex; Strong versus loose connections between the physical object and the digital content. This paper is based on four cases, two of which concern cultural heritage installations, the others...

  15. The effectiveness of telephone counselling and internet- and text-message-based support for smoking cessation

    DEFF Research Database (Denmark)

    Skov-Ettrup, Lise S; Dalum, Peter; Bech, Mickael

    2016-01-01

    counselling group compared with the booklet group (7.3% vs. 3.6%, OR=2.2 (95% CI 1.2-4.0)), There was no clear evidence of a difference in prolonged abstinence between the reactive telephone counselling group or the internet-based smoking cessation program and the booklet group: 1.8% vs. 3.6%, OR=0.8 (95% CI...... 0.6-1.2) and 5.3% vs. 3.6%, OR=1.6 (95% CI 0.8-3.0) respectively. In the proactive telephone counselling group, the cost per additional 12-month quitter compared with the booklet group was £644. CONCLUSIONS: Proactive telephone counselling was more effective than a self-help booklet in achieving......AIM: To compare the effectiveness of proactive telephone counselling, reactive telephone counselling and an internet- and text messages-based intervention with a self-help booklet for smoking cessation. DESIGN: A randomised controlled trial with equal allocation to four conditions: 1) Proactive...

  16. One-Year Weight Loss with a Telephone-Based Lifestyle Program

    Directory of Open Access Journals (Sweden)

    Christina Holzapfel

    2016-07-01

    Full Text Available Objective: Telephone-based weight loss programs are offered as an alternative to face-to-face obesity treatments, but data on the effectiveness regarding weight loss are limited. Therefore, we evaluated a telephone-based lifestyle program in a real-world setting. Methods: The telephone-based intervention consists of regular phone calls providing individualized lifestyle recommendations, and delivery of printed materials. Anthropometric and metabolic data are collected by general practitioners or are self-reported. Results: Baseline data were available from 398 participants (61% men; weight 103.12 ± 14.21 kg; BMI 33.38 ± 2.83 kg/m2 and 1-year data from 258 (65% participants. In the completers, mean weight change was -4.25 ± 5.18 kg (p Conclusions: The telephone-based lifestyle program results in a moderate weight loss after 12 months, which may be comparable to face-to-face interventions. Telephone-based weight loss support is independent of time and location and represents a tool which is also accepted by men.

  17. Testing a Model of Functional Impairment in Telephone Crisis Support Workers.

    Science.gov (United States)

    Kitchingman, Taneile A; Wilson, Coralie J; Caputi, Peter; Wilson, Ian; Woodward, Alan

    2017-11-01

    It is well known that helping professionals experience functional impairment related to elevated symptoms of psychological distress as a result of frequent empathic engagement with distressed others. Whether telephone crisis support workers are impacted in a similar way is not currently reported in the literature. The purpose of this study was to test a hypothesized model of factors contributing to functional impairment in telephone crisis support workers. A national sample of 210 telephone crisis support workers completed an online survey including measures of emotion regulation, symptoms of general psychological distress and suicidal ideation, intentions to seek help for symptoms, and functional impairment. Structural equation modeling was used to test the fit of the data to the hypothesized model. Goodness-of-fit indices were adequate and supported the interactive effects of emotion regulation, general psychological distress, suicidal ideation, and intentions to seek help for ideation on functional impairment. These results warrant the deliberate management of telephone crisis support workers' impairment through service selection, training, supervision, and professional development strategies. Future research replicating and extending this model will further inform the modification and/or development of strategies to optimize telephone crisis support workers' well-being and delivery of support to callers.

  18. Telephone reminders reduced the non-attendance rate in a gastroenterology outpatient clinic.

    Science.gov (United States)

    Jeppesen, Maja Haunstrup; Ainsworth, Mark Andrew

    2015-06-01

    Non-attendance is a global health-care problem. The aim of the present study was 1) to investigate if a telephone reminder could reduce the non-attendance rate, 2) to study reasons for non-attendance and 3) to evaluate if a permanent implementation would be economically advantageous in a gastroenterology outpatient clinic like ours. This was a comparative intervention study with a historical control group in a gastroenterology outpatient clinic. The study lasted six months. Patients with a scheduled appointment in the first three-month period received no reminder (control group, n = 2,705). Patients in the following three-month period were reminded by telephone one weekday in advance of their appointment, when possible (intervention group, n = 2,479). Non-attending patients in the intervention group received a questionnaire. Based on the results, a financial cost-benefit analysis was made. In the intervention group, 1,577 (64%) patients answered the reminder telephone call. The non-attendance rate was significantly lower in the intervention group (6.1%) than in the control group (10.5%) (p < 0.00001). Only 1.3% of the patients who answered the reminder turned out to be non-attendees. The most common explanation for non-attendance in the intervention group was forgetfulness (39%). The reminder telephone call was cost-effective. In this outpatient clinic, telephone reminders were cost-effective and significantly reduced the non-attendance rate by 43%.

  19. An assessesment of telephone assistance systems for caregivers of patients with Alzheimer's disease.

    Science.gov (United States)

    Garzón-Maldonado, F J; Gutiérrez-Bedmar, M; Serrano-Castro, V; Requena-Toro, M V; Padilla-Romero, L; García-Casares, N

    Telephone assistance is a common practice in neurology, although there are only a few studies about this type of healthcare. We have evaluated a Telephone Assistance System (TAS) for caregivers of patients with Alzheimer's disease (AD) from 2 points of view: financially and according to the level of satisfaction of the caregiver. 97 patients with a diagnosis of AD according to NINCDS-ADRDA criteria and their 97 informal caregivers were selected. We studied cost differences between on-site assistance and telephone assistance (TAS) for 12 months. We used a self-administered questionnaire to assess the level of satisfaction of caregivers at the end of the study period. TAS savings amounted to 80.05 ± 27.07 euros per user. 73.6% of the caregivers consider TAS a better or much better system than on-site assistance, while only 2.6% of the caregivers considered TAS a worse or much worse system than on-site assistance. Telephone assistance systems are an efficient healthcare resource for monitoring patients with AD in neurology departments. Furthermore, the level of user satisfaction was high. We therefore consider that telephone assistance service should be offered by healthcare services. Copyright © 2016 Sociedad Española de Neurología. Publicado por Elsevier España, S.L.U. All rights reserved.

  20. A method of installing a reactor container

    International Nuclear Information System (INIS)

    Hayashi, Kenji; Murakawa, Hisao.

    1975-01-01

    Object: To achieve exact installation of a reactor container at a site. Structure: A pole is set upright at the center of a cylindrical base portion, a plurality of beams are disposed around the pole in a radial fashion to form a cone, a plurality of steel plates are mounted successively around the cone through a ring, and the steel plates are welded to each other to assemble and install a reactor container at the same time. (Kamimura, M.)

  1. Solar Panel Installations on Existing Structures

    OpenAIRE

    Tim D. Sass; Pe; Leed

    2013-01-01

    The rising price of fossil fuels, government incentives and growing public aware-ness for the need to implement sustainable energy supplies has resulted in a large in-crease in solar panel installations across the country. For many sites the most eco-nomical solar panel installation uses existing, southerly facing rooftops. Adding solar panels to an existing roof typically means increased loads that must be borne by the building-s structural elements. The structural desig...

  2. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  3. Solar system installation at Louisville, Kentucky

    Science.gov (United States)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  4. Broaching installation for cutting holes in a plate and broaching process

    International Nuclear Information System (INIS)

    Beraudier, D.; Douheret, J.Y.

    1995-01-01

    The installation consists of two lines of broaching with successive actions, each containing a pulling unit and an attachment having their axes of displacement aligned to follow the common work axis. The axes of work of the two broaching lines are separated by a distance at least equal to the diameter of the plate. The two pulling units and the two attachments are placed one on either side of the plate to be broached. 6 figs

  5. Supporting Family Carers Through Telephone-Mediated Group Programs: Opportunities For Gerontological Social Workers.

    Science.gov (United States)

    Shanley, Chris

    2008-01-01

    Telephone-mediated group programs are an important but under-utilized medium for reaching frail or disabled older persons' family carers who are in need of support. The primary purpose and style of group programs can range across a broad spectrum–encompassing educational, supportive and therapeutic types. Gerontological social workers are the members of the multidisciplinary care team whose training, experience and supervision makes them most suitable for facilitating this broad range of group types. Drawing on the experience of training a number of group facilitators, this article provides suggestions for social workers contemplating the use of telephone-mediated groups and highlights groupwork skills peculiar to conducting group programs via the telephone.

  6. Telephone reminders reduced the non-attendance rate in a gastroenterology outpatient clinic

    DEFF Research Database (Denmark)

    Jeppesen, Maja Haunstrup; Ainsworth, Mark Andrew

    2015-01-01

    in a gastroenterology outpatient clinic like ours. METHODS: This was a comparative intervention study with a historical control group in a gastroenterology outpatient clinic. The study lasted six months. Patients with a scheduled appointment in the first three-month period received no reminder (control group, n = 2......,705). Patients in the following three-month period were reminded by telephone one weekday in advance of their appointment, when possible (intervention group, n = 2,479). Non-attending patients in the intervention group received a questionnaire. Based on the results, a financial cost-benefit analysis was made......-attendees. The most common explanation for non-attendance in the intervention group was forgetfulness (39%). The reminder telephone call was cost-effective. CONCLUSION: In this outpatient clinic, telephone reminders were cost-effective and significantly reduced the non-attendance rate by 43%....

  7. Gender and the Telephone: Voice and Emotions Shaping and Gendering Space

    Directory of Open Access Journals (Sweden)

    Mona Livholts

    2013-01-01

    Full Text Available In the field of communication studies, the topic of telephony and the gendering of space via voice and emotions has received limited attention. The focus of this article is how telephone conversations are mediated by voice and emotions, which in turn shape and gender social space. The methodology is a collaborative autoethnographic design based on diary notes and memory work. Two central themes emerge from the findings that explain how space becomes gendered when using the telephone: (a the voice and relations of power, and (b the interstices between work, caring, and the telephone. Our findings reveal the central role of work and caring and how these spaces constantly are being traversed and transformed as the mobile phone becomes an important appendage for sensory perceptions of hearing/listening/voice. We argue that these themes point toward the crucial impact of emotions in the construction of multiple and gendered spatialities of telephony.

  8. 40 CFR 63.4568 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ... direction indicator must be installed in each bypass line or air makeup supply line that could divert the... via relative accuracy testing. (vi) Perform leak checks monthly. (vii) Perform visual inspections of... accuracy of at least 0.5 inches of water column or 5 percent of the measured value, whichever is larger...

  9. Disparities in the Use of Internet and Telephone Medication Refills among Linguistically Diverse Patients.

    Science.gov (United States)

    Moreno, Gerardo; Lin, Elizabeth H; Chang, Eva; Johnson, Ron L; Berthoud, Heidi; Solomon, Cam C; Morales, Leo S

    2016-03-01

    Health systems are increasingly implementing remote telephone and Internet refill systems to enhance patient access to medication refills. Remote refill systems may provide an effective approach for improving medication non-adherence, but more research is needed among patients with limited English proficiency with poor access to remote refill systems. To compare the use of remote medication refill systems among limited-English-proficiency (LEP) and English-proficient (EP) patients with chronic conditions. Cross-sectional survey in six languages/dialects (English, Cantonese, Mandarin, Korean, Vietnamese, and Spanish) of 509 adults with diabetes, hypertension, or hyperlipidemia. Primary study outcomes were self-reported use of 1) Internet refills, 2) telephone refills, and 3) any remote refill system. LEP was measured by patient self-identification of a primary language other than English and a claims record of use of an interpreter. Other measures were age, gender, education, years in the U.S., insurance, health status, chronic conditions, and number of prescribed medications. Analyses included multivariable logistic regression weighted for survey non-response. Overall, 33.1 % of patients refilled their medications by telephone and 31.6 % by Internet. Among LEP patients (n = 328), 31.5 % refilled by telephone and 21.2 % by Internet, compared with 36.7 % by telephone and 52.7 % by Internet among EP patients (n = 181). Internet refill by language groups were as follows: English (52.7 %), Cantonese (34.9 %), Mandarin (17.4 %), Korean (16.7 %), Vietnamese (24.4 %), and Spanish (12.6 %). Compared to EP patients, LEP patients had lower use of any remote refill system (adjusted odds ratio [AOR] 0.18; p use any remote medication refill system. Increased reliance on current systems for remote medication refills may increase disparities in health outcomes affecting LEP patients with poor access to telephone and Internet medication refills.

  10. Post-operative telephone review is cost-effective and acceptable to patients.

    LENUS (Irish Health Repository)

    Gray, R T

    2012-02-01

    INTRODUCTION: Patients undergoing selective minor emergency and elective procedures are followed up by a nurse-led structured telephone review six weeks post-operatively in our hospital. Our study objectives were to review patients\\' satisfaction, assess cost-effectiveness and compare our practice with other surgical units in Northern Ireland (NI). PATIENTS AND METHODS: Completed telephone follow-up forms were reviewed retrospectively for a three-year period and cost savings calculated. Fifty patients were contacted prospectively by telephone using a questionnaire to assess satisfaction of this follow-up. A postal questionnaire was sent to 68 general and vascular surgeons in NI, assessing individual preferences for patient follow-up. RESULTS: A total of 1378 patients received a telephone review from September 2005 to September 2008. One thousand one hundred and seventy-seven (85.4%) were successfully contacted, while 201 (14.6%) did not respond despite multiple attempts. One hundred and forty-seven respondents (10.7%) required further outpatient follow-up, thereby saving 1231 outpatient reviews, equivalent to pound41,509 per annum. Thirty-nine (78%) patients expected post-operative follow-up, with 29 (58%) expecting this in the outpatient department. However, all patients were satisfied with the nurse-led telephone review. Fifty-three (78%) consultants responded. Those who always, or occasionally, review patients post-operatively varies according to the operation performed, ranging from 2.2% appendicectomy patients to 40.0% for varicose vein surgery. CONCLUSION: Current practice in NI varies, but a significant proportion of patients are not routinely reviewed. This study confirmed that patients expect post-operative follow-up. A nurse-led telephone review service is acceptable to patients, cost-effective and reduces the number of unnecessary outpatient reviews.

  11. Statistical Model Checking for Product Lines

    DEFF Research Database (Denmark)

    ter Beek, Maurice H.; Legay, Axel; Lluch Lafuente, Alberto

    2016-01-01

    average cost of products (in terms of the attributes of the products’ features) and the probability of features to be (un)installed at runtime. The product lines must be modelled in QFLan, which extends the probabilistic feature-oriented language PFLan with novel quantitative constraints among features...

  12. 29 CFR 1926.955 - Overhead lines.

    Science.gov (United States)

    2010-07-01

    ... installing or removing wire or cable, strains to which poles and structures will be subjected shall be... being strung in or removed shall be kept under positive control by the use of adequate tension reels... adjacent to energized lines the tension stringing method or other methods which preclude unintentional...

  13. Refrigerant lines in split-type air conditioners

    Energy Technology Data Exchange (ETDEWEB)

    Rettenberger, P

    1979-01-01

    Condensator and evaporating units of split-type air conditioners are evaluated and filled with the refrigerant by the producer. The line systems are hermetically closed and prevent the loss of refrigerant and the penetration of moisture or dirt. The best installation method is the 'bendable lines'. They combine flexibility and easy installation with the advantages of the copper pipe. Several ducting systems and their connecting elements like couplings and valves are described, their installation is explained. These flexible systems are especially suitable for small air-condition plants of the split-type the evaporating unit of which is portable and can put where it is desired.

  14. 'Putting Life in Years' (PLINY) telephone friendship groups research study: pilot randomised controlled trial.

    Science.gov (United States)

    Mountain, Gail A; Hind, Daniel; Gossage-Worrall, Rebecca; Walters, Stephen J; Duncan, Rosie; Newbould, Louise; Rex, Saleema; Jones, Carys; Bowling, Ann; Cattan, Mima; Cairns, Angela; Cooper, Cindy; Edwards, Rhiannon Tudor; Goyder, Elizabeth C

    2014-04-24

    Loneliness in older people is associated with poor health-related quality of life (HRQoL). We undertook a parallel-group randomised controlled trial to evaluate the effectiveness and cost-effectiveness of telephone befriending for the maintenance of HRQoL in older people. An internal pilot tested the feasibility of the trial and intervention. Participants aged >74 years, with good cognitive function, living independently in one UK city were recruited through general practices and other sources, then randomised to: (1) 6 weeks of short one-to-one telephone calls, followed by 12 weeks of group telephone calls with up to six participants, led by a trained volunteer facilitator; or (2) a control group. The main trial required the recruitment of 248 participants in a 1-year accrual window, of whom 124 were to receive telephone befriending. The pilot specified three success criteria which had to be met in order to progress the main trial to completion: recruitment of 68 participants in 95 days; retention of 80% participants at 6 months; successful delivery of telephone befriending by local franchise of national charity. The primary clinical outcome was the Short Form (36) Health Instrument (SF-36) Mental Health (MH) dimension score collected by telephone 6 months following randomisation. We informed 9,579 older people about the study. Seventy consenting participants were randomised to the pilot in 95 days, with 56 (80%) providing valid primary outcome data (26 intervention, 30 control). Twenty-four participants randomly allocated to the research arm actually received telephone befriending due to poor recruitment and retention of volunteer facilitators. The trial was closed early as a result. The mean 6-month SF-36 MH scores were 78 (SD 18) and 71 (SD 21) for the intervention and control groups, respectively (mean difference, 7; 95% CI, -3 to 16). Recruitment and retention of participants to a definitive trial with a recruitment window of 1 year is feasible. For

  15. ‘Putting Life in Years’ (PLINY) telephone friendship groups research study: pilot randomised controlled trial

    Science.gov (United States)

    2014-01-01

    Background Loneliness in older people is associated with poor health-related quality of life (HRQoL). We undertook a parallel-group randomised controlled trial to evaluate the effectiveness and cost-effectiveness of telephone befriending for the maintenance of HRQoL in older people. An internal pilot tested the feasibility of the trial and intervention. Methods Participants aged >74 years, with good cognitive function, living independently in one UK city were recruited through general practices and other sources, then randomised to: (1) 6 weeks of short one-to-one telephone calls, followed by 12 weeks of group telephone calls with up to six participants, led by a trained volunteer facilitator; or (2) a control group. The main trial required the recruitment of 248 participants in a 1-year accrual window, of whom 124 were to receive telephone befriending. The pilot specified three success criteria which had to be met in order to progress the main trial to completion: recruitment of 68 participants in 95 days; retention of 80% participants at 6 months; successful delivery of telephone befriending by local franchise of national charity. The primary clinical outcome was the Short Form (36) Health Instrument (SF-36) Mental Health (MH) dimension score collected by telephone 6 months following randomisation. Results We informed 9,579 older people about the study. Seventy consenting participants were randomised to the pilot in 95 days, with 56 (80%) providing valid primary outcome data (26 intervention, 30 control). Twenty-four participants randomly allocated to the research arm actually received telephone befriending due to poor recruitment and retention of volunteer facilitators. The trial was closed early as a result. The mean 6-month SF-36 MH scores were 78 (SD 18) and 71 (SD 21) for the intervention and control groups, respectively (mean difference, 7; 95% CI, -3 to 16). Conclusions Recruitment and retention of participants to a definitive trial with a

  16. Implementing telephone triage in general practice: a process evaluation of a cluster randomised controlled trial.

    Science.gov (United States)

    Murdoch, Jamie; Varley, Anna; Fletcher, Emily; Britten, Nicky; Price, Linnie; Calitri, Raff; Green, Colin; Lattimer, Valerie; Richards, Suzanne H; Richards, David A; Salisbury, Chris; Taylor, Rod S; Campbell, John L

    2015-04-10

    Telephone triage represents one strategy to manage demand for face-to-face GP appointments in primary care. However, limited evidence exists of the challenges GP practices face in implementing telephone triage. We conducted a qualitative process evaluation alongside a UK-based cluster randomised trial (ESTEEM) which compared the impact of GP-led and nurse-led telephone triage with usual care on primary care workload, cost, patient experience, and safety for patients requesting a same-day GP consultation. The aim of the process study was to provide insights into the observed effects of the ESTEEM trial from the perspectives of staff and patients, and to specify the circumstances under which triage is likely to be successfully implemented. Here we report perspectives of staff. The intervention comprised implementation of either GP-led or nurse-led telephone triage for a period of 2-3 months. A qualitative evaluation was conducted using staff interviews recruited from eight general practices (4 GP triage, 4 Nurse triage) in the UK, implementing triage as part of the ESTEEM trial. Qualitative interviews were undertaken with 44 staff members in GP triage and nurse triage practices (16 GPs, 8 nurses, 7 practice managers, 13 administrative staff). Staff reported diverse experiences and perceptions regarding the implementation of telephone triage, its effects on workload, and on the benefits of triage. Such diversity were explained by the different ways triage was organised, the staffing models used to support triage, how the introduction of triage was communicated across practice staff, and by how staff roles were reconfigured as a result of implementing triage. The findings from the process evaluation offer insight into the range of ways GP practices participating in ESTEEM implemented telephone triage, and the circumstances under which telephone triage can be successfully implemented beyond the context of a clinical trial. Staff experiences and perceptions of telephone

  17. Telephone reminders reduced the non-attendance rate in a gastroenterology outpatient clinic

    DEFF Research Database (Denmark)

    Jeppesen, Maja Haunstrup; Ainsworth, Mark Andrew

    2015-01-01

    INTRODUCTION: Non-attendance is a global health-care problem. The aim of the present study was 1) to investigate if a telephone reminder could reduce the non-attendance rate, 2) to study reasons for non-attendance and 3) to evaluate if a permanent implementation would be economically advantageous......,705). Patients in the following three-month period were reminded by telephone one weekday in advance of their appointment, when possible (intervention group, n = 2,479). Non-attending patients in the intervention group received a questionnaire. Based on the results, a financial cost-benefit analysis was made...

  18. Using Your VOICE(S: Adding Telephonic Communication to Pharmacy Education

    Directory of Open Access Journals (Sweden)

    Lorin B Grieve

    2017-06-01

    Full Text Available Pharmacists utilize a myriad of communication methods to deliver patient care. One of the most prevalent communication methods is the telephone. The University of Pittsburgh School of Pharmacy created a novel instructional and assessment technique to enhance student pharmacist training experiences in telephonic communication within the PharmD curriculum. Conflict of Interest We declare no conflicts of interest or financial interests that the authors or members of their immediate families have in any product or service discussed in the manuscript, including grants (pending or received, employment, gifts, stock holdings or options, honoraria, consultancies, expert testimony, patents and royalties   Type: Note

  19. Cost effectiveness of a telephone intervention to promote dilated fundus examination in adults with diabetes mellitus

    Directory of Open Access Journals (Sweden)

    Clyde B Schechter

    2008-05-01

    Full Text Available Clyde B Schechter1, Charles E Basch2, Arlene Caban3, Elizabeth A Walker41Departments of Family and Social Medicine and Epidemiology and Population Health, Albert Einstein College of Medicine, Bronx, New York, USA; 2Department of Health Behavior Studies, Teachers College, Columbia University, New York, NY, USA; 3Department of Medicine, Albert Einstein College of Medicine, Bronx, NY, USA; 4Departments of Medicine and Epidemiology and Population Health, Albert Einstein College of Medicine, Bronx, New York, USAAbstract: In a clinical trial, we have previously shown that a telephone intervention can significantly increase participation in dilated fundus examination (DFE screening among low-income adults with diabetes. Here the costs and cost-effectiveness ratio of this intervention are calculated. Intervention effectiveness was estimated as the difference in DFE utilization between the telephone intervention and print groups from the clinical trial multiplied by the size of the telephone intervention group. A micro-costing approach was used. Personnel time was aggregated from logs kept during the clinical trial of the intervention. Wage rates were taken from a commercial compensation database. Telephone charges were estimated based on prevailing fees. The cost-effectiveness ratio was calculated as the ratio of total costs of the intervention to the number of DFEs gained by the intervention. A sensitivity analysis estimated the cost-effectiveness of a more limited telephone intervention. A probabilistic sensitivity analysis using bootstrap samples from the clinical trial results quantified the uncertainties in resource utilization and intervention effectiveness. Net intervention costs were US$18,676.06, with an associated gain of 43.7 DFEs and 16.4 new diagnoses of diabetic retinopathy. The cost-effectiveness ratio is US$427.37 per DFE gained. A restricted intervention limiting the number of calls to 5, as opposed to 7, would achieve the same results

  20. The Swiss nuclear installations annual report 1992

    International Nuclear Information System (INIS)

    1993-06-01

    This report concerns the safety of the Swiss nuclear installations in the period of 1992. Surveillance of these installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). In Switzerland five nuclear power plants are operational: Beznau I and II, Muehleberg, Goesgen and Leibstadt. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basle. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut down experimental reactor of Lucens, the exploration in Switzerland of final disposal facilities for radwaste and the interim radwaste storage facilities. The present report first deals with the nuclear power plants and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK (chapters 1-4). In chapter 5, the corresponding information is given for the research installations. Chapter 6 on radwaste disposal is dedicated to the waste treatment, waste from reprocessing, interim storage and exploration by the NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' vicinity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into some general questions relating to the safety of nuclear installations, and in particular covers important events in nuclear installations abroad. In all, the operation of the Swiss nuclear installations in the period of 1992 is rated safe by HSK. (author) 7 figs., 13 tabs

  1. New technique for landfill leachate well installation

    International Nuclear Information System (INIS)

    Hornsby, R.G.; Miller, M.S.

    1991-01-01

    The installation method fulfilled our expectations. The entire well installation took eight writing days to complete, for an average of two wells per day. It met our Health and Safety, waste volume, environmental risk and uniform sandpack expectations. Health and Safety concerns were minimal. We found that virtually all work could be completed using Level D protection. The volume of waste produced by the well installation was extremely low. The core samples and casing scrapings were the only well installation wastes directly produced. The waste containers which required sampling prior to disposal were: Decontaminated water (330 gallons), Personnel protective equipment and water (715 gallons), Soil cores (25 gallons), Land leachate (440 gallons). Each waste type was sampled and submitted to a laboratory for analyses of full Appendix 3 plus U.S. EPA toxicity parameters. The results verified that all of the wastes could be disposed of on-site. Since the only drilling wastes were the clay core samples and the very small amount of material adhering to the casing, contamination of the new clay cap did not occur. A uniform sandpack was guaranteed through the use of a presanded well screen. The loose sand added when the casing was removed served to fill any voids. All the leachate wells have water in them, and it appears that they will function adequately. We are in the process of constructing a treatment and storage facility to manage the liquids to be extracted for off-site disposal. The long-term effectiveness of the wells will be quantified. This well installation method should be considered in situations requiring the following: expedited installation; reduced Health and Safety concerns; reduced disposal costs; reduced potential for adverse environmental impact; and comparable installation costs. The choice of this method must include considerations of the subsurface geology and the nature of any manmade materials

  2. Instalaţie de condensare gaze exhaustate de la linia de presare feţe de uşi (HDF, cu recuperator de căldură şi colectare ape uzate/Condensing instalation for exhausted gas from door-skin pressing line (HDF with heat recovery and waste water collecting

    Directory of Open Access Journals (Sweden)

    Nicolae BĂDIN

    2016-12-01

    Full Text Available During the door-skin pressing (HDF, on the production facility are emitted an importing quantity of gases which have an substantial part of dust (small particles and another pollutant (formaldehyde, etc. Ordinary production line give all those gases in atmosphere but the newest prescription of European regulation (BAT try to reduce to the minimum (eliminate if it possible those emissions .In this ideas I present one solution for capture gases and use his energy for another purposes. In the same time, waste water with polluted material are collected separately and stored, used or eliminated with proper company.

  3. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  4. production lines

    Directory of Open Access Journals (Sweden)

    Jingshan Li

    2000-01-01

    Full Text Available In this work, serial production lines with finished goods buffers operating in the pull regime are considered. The machines are assumed to obey Bernoulli reliability model. The problem of satisfying customers demand is addressed. The level of demand satisfaction is quantified by the due-time performance (DTP, which is defined as the probability to ship to the customer a required number of parts during a fixed time interval. Within this scenario, the definitions of DTP bottlenecks are introduced and a method for their identification is developed.

  5. Site evaluation for nuclear installations. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Siting, which was issued in 1988 as Safety Series No. 50-C-S (Rev. 1). It takes account of developments relating to site evaluations for nuclear installations since the Code on Siting was last revised. These developments include the issuing of the Safety Fundamentals publication on The Safety of Nuclear Installations, and the revision of various safety standards and other publications relating to safety. Requirements for site evaluation are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear installations. It is recognized that there are steady advances in technology and scientific knowledge, in nuclear safety and in what is considered adequate protection. Safety requirements change with these advances and this publication reflects the present consensus among States. This Safety Requirements publication was prepared under the IAEA programme on safety standards for nuclear installations. It establishes requirements and provides criteria for ensuring safety in site evaluation for nuclear installations. The Safety Guides on site evaluation listed in the references provide recommendations on how to meet the requirements established in this Safety Requirements publication. The objective of this publication is to establish the requirements for the elements of a site evaluation for a nuclear installation so as to characterize fully the site specific conditions pertinent to the safety of a nuclear installation. The purpose is to establish requirements for criteria, to be applied as appropriate to site and site-installation interaction in operational states and accident conditions, including those that could lead to emergency measures for: (a) Defining the extent of information on a proposed site to be presented by the applicant; (b) Evaluating a proposed site to ensure that the site

  6. Telephone delivered interventions for reducing morbidity and mortality in people with HIV infection.

    Science.gov (United States)

    Gentry, Sarah; van-Velthoven, Michelle H M M T; Tudor Car, Lorainne; Car, Josip

    2013-05-31

    This is one of three Cochrane reviews examining the role of the telephone in HIV/AIDS services. Telephone interventions, delivered either by landline or mobile phone, may be useful in the management of people living with HIV (PLHIV) in many situations. Telephone delivered interventions have the potential to reduce costs, save time and facilitate more support for PLHIV. To assess the effectiveness of voice landline and mobile telephone delivered interventions for reducing morbidity and mortality in people with HIV infection. We searched The Cochrane Central Register of Controlled Trials, MEDLINE, PubMed Central, EMBASE, PsycINFO, ISI Web of Science, Cumulative Index to Nursing & Allied Health, World Health Organisation's The Global Health Library and Current Controlled Trials from 1980 to June 2011. We searched the following grey literature sources: Dissertation Abstracts International, Centre for Agriculture Bioscience International Direct Global Health database, The System for Information on Grey Literature Europe, The Healthcare Management Information Consortium database, Google Scholar, Conference on Retroviruses and Opportunistic Infections, International AIDS Society, AIDS Educational Global Information System and reference lists of articles. Randomised controlled trials (RCTs), quasi-randomised controlled trials, controlled before and after studies, and interrupted time series studies comparing the effectiveness of telephone delivered interventions for reducing morbidity and mortality in persons with HIV infection versus in-person interventions or usual care, regardless of demographic characteristics and in all settings. Both mobile and landline telephone interventions were included, but mobile phone messaging interventions were excluded. Two reviewers independently searched, screened, assessed study quality and extracted data. Primary outcomes were change in behaviour, healthcare uptake or clinical outcomes. Secondary outcomes were appropriateness of the

  7. Department of the Army Installation Restoration Program

    International Nuclear Information System (INIS)

    Anderson, A.W.

    1988-01-01

    The Army's Installation Restoration Program (IRP) was established in 1975 in response to regulatory action at several installations where past disposal practices had caused contamination of streams and groundwater. The need to decontaminate excess Army-owned real estate also was considered in early IRP activities. A variety of site types have been discovered on Army installations. The major site types evaluated to date include: contaminated soil areas, landfills, lagoons, buildings, burning grounds, sumps, pits, storage tanks, sewage treatment plants, storage pads, industrial wastewater treatment plants, and salvage yards. Twenty Army installations have been proposed for or listed on the National Priorities List (NPL). The need for taking action at hazardous waste sites, however, is based on threats they pose to human health, welfare or the environment. Sites do not have to be on the SPL in order to be cleaned up through IRP activities. All of the sites that caused Army installations to be proposed for the NPL are being evaluated and cleaned up. In addition, all Army properties have been or will be assessed and where needed they will be addressed by the IRP

  8. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  9. Design and installation of earth energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, S; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2002-07-01

    This first edition of the Canadian Standards Association (CSA) Standard C448 Series, replaces CSA Standards CAN/CSA-C445-M92 entitled Design and Installation of Earth Energy Heat Pump Systems for Residential and Other Small Buildings, as well as C447-94 entitled Design and Installation of Earth Energy Heat Pump Systems for Commercial and Institutional Buildings. This standard document consists of three parts: (C448.1) Design and installation of earth energy systems for commercial and institutional buildings; (C448.2) Design and installation of earth energy systems for residential and small buildings; and, (C448.3) Design and installation of underground thermal energy storage systems for commercial and institutional buildings. In C448.1, the requirements applicable to any system falling within the scope of the C448 series were included. Alternative requirements for houses and small buildings were added in C448.2. It was noted that either standard may be implemented. The standards applicable to the intentional storage of energy in the earth for later use were presented in C448.3. This latter section includes a brief introduction on underground thermal energy storage (UTES). tabs.

  10. Lightning Performance on Overhead Distribution Lines : After Improvement Field Observation

    Directory of Open Access Journals (Sweden)

    Reynaldo Zoro

    2009-11-01

    Full Text Available Two feeders of 20 kV overhead distribution lines which are located in a high lightning density area are chosen to be observed as a field study due to their good lightning performance after improvement of lightning protection system. These two feeders used the new overhead ground wire and new line arrester equipped with lightning counter on the main lines. The significant reduced of lines outages are reported. Study was carried out to observe these improvements by comparing to the other two feeders line which are not improved and not equipped yet with the ground wire and line arrester. These two feeders located in the nearby area. Two cameras were installed to record the trajectory of the lightning strikes on the improved lines. Lightning peak currents are measured using magnetic tape measurement system installed on the grounding lead of lightning arrester. Lightning overvoltage calculations are carried out by using several scenarios based on observation results and historical lightning data derived from lightning detection network. Lightning overvoltages caused by indirect or direct strikes are analyzed to get the lightning performance of the lines. The best scenario was chosen and performance of the lines were improved significantly by installing overhead ground wire and improvement of lightning arrester installation.

  11. Telephone Encounters Predict Future High Financial Expenditures in Inflammatory Bowel Disease Patients: A 3-Year Prospective Observational Study.

    Science.gov (United States)

    Click, Benjamin; Anderson, Alyce M; Ramos Rivers, Claudia; Koutroubakis, Ioannis E; Hashash, Jana G; Dunn, Michael A; Schwartz, Marc; Swoger, Jason; Barrie, Arthur; Szigethy, Eva; Regueiro, Miguel; Schoen, Robert E; Binion, David G

    2018-04-01

    Telephone activity is essential in management of complex chronic diseases including inflammatory bowel disease (IBD). Telephone encounters logged in the electronic medical record have recently been proposed as a surrogate marker of disease activity and impending health care utilization; however, the association between telephone calls and financial expenditures has not been evaluated. We performed a 3-year prospective observational study of telephone encounters logged at a tertiary referral IBD center. We analyzed patient demographics, disease characteristics, comorbidities, clinical activity, and health care financial charges by telephone encounter frequency. Eight hundred one patients met inclusion criteria (52.3% female; mean age, 44.1 y), accounted for 12,669 telephone encounters, and accrued $70,513,449 in charges over 3 years. High telephone encounter frequency was associated with female gender (P=0.003), anxiety/depression (Pfinancial charges the following year after controlling for demographic, utilization, and medication covariates. Increased telephone encounters are associated with significantly higher health care utilization and financial expenditures. Increased call frequency is predictive of future health care spending. Telephone encounters are a useful tool to identify patients at risk of clinical deterioration and large financial expense.

  12. Line facilities outline

    International Nuclear Information System (INIS)

    1998-08-01

    This book deals with line facilities. The contents of this book are outline line of wire telecommunication ; development of line, classification of section of line and theory of transmission of line, cable line ; structure of line, line of cable in town, line out of town, domestic cable and other lines, Optical communication ; line of optical cable, transmission method, measurement of optical communication and cable of the sea bottom, Equipment of telecommunication line ; telecommunication line facilities and telecommunication of public works, construction of cable line and maintenance and Regulation of line equipment ; regulation on technique, construction and maintenance.

  13. Childhood cancer and nuclear installations: a review

    International Nuclear Information System (INIS)

    Muirhead, C.R.

    1998-01-01

    Many epidemiological studies of childhood cancer around nuclear installations have been conducted in recent years. This article reviews results from Great Britain and elsewhere. Geographical studies have indicated raised risks of childhood leukaemia around some British nuclear installations. However, environmental assessments suggest that the findings are unlikely to be due to radioactive releases from the sites. Case-control studies have allowed more detailed investigation of putative risk factors than is possible from geographical studies. In particular, a recent national study in Britain does not support the hypothesis raised by an earlier study in West Cumbria that paternal radiation exposure prior to conception may increase the risk of leukaemia and non-Hodgkin's lymphoma in offspring. Other studies suggest that childhood leukaemia may have an infective basis, although there is still uncertainty about whether this would explain the findings around nuclear installations. The UK Childhood Cancer Study may provide more information on the causes of these diseases. (author)

  14. Installation Strategy for the LHC Main Dipoles

    CERN Multimedia

    Fartoukh, Stephane David

    2004-01-01

    All positions in the LHC machine are not equivalent in terms of beam requirements on the geometry and the field quality of the main dipoles. In the presence of slightly or strongly out-of tolerance magnets, a well-defined installation strategy will therefore contribute to preserve or even optimize the performance of the machine. Based on the present status of the production, we have anticipated a list of potential issues (geometry, transfer function, field direction and random b3) which, combined by order of priority, have been taken into account to define a simple but efficient installation algorithm for the LHC main dipoles. Its output is a prescription for installing the available dipoles in sequence while reducing to an absolute minimum the number of holes required by geometry or FQ issues.

  15. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  16. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  17. VERA 3.5 Installation Guide

    International Nuclear Information System (INIS)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-01-01

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  18. Study on installation of the submersible mixer

    International Nuclear Information System (INIS)

    Tian, F; Shi, W D; He, X H; Xu, Y H; Jiang, H

    2013-01-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice

  19. Listed installations for environmental protection in hospitals

    International Nuclear Information System (INIS)

    Mullot, J.U.; Chaulet, J.F.; Thual, A.; Lafon, M.

    1999-01-01

    This work deals with the implications of different French rules and regulations concerning the environmental protection in hospitals. A special place is given to listed installations for environmental protection, because of their importance. A summary of important regulatory texts is presented concerning these installations, and also an inventory of installations or activities concerned, and the definition of the necessary procedures. Some ideas are also given about the much needed creation of an 'environmental network' inside hospitals, in order to cope with these concerns. Then, we briefly deal with more recent developments concerning the environmental protection, which will, no doubt, extend to hospitals, such as the French water law, air law, and procedures for the management of medical waste. Finally, the stakes of environmental decisions in hospitals and the chemist's place in these decisions are debated. (authors)

  20. Optical fibers installation the different technologies and the advantages of using the RTE power grid; Pose de fibres optiques les differentes technologies et les avantages lies a l'utilisation du reseau de transport d'electricite de RTE

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    To install optical fibers lines RTE implements two different technologies: the THYM line and the COE line. The two technologies are explained and compared with the advantages of using RTE for such an equipment. (A.L.B.)

  1. Offshore wind transport and installation vessel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The initial objective of the project was to complete a feasibility study to determine the viability of an innovative transportation vessel to be deployed in the installation of offshore wind farms. This included the feasibility of providing a stable-working platform that can be used in harsh offshore environments. A study of current installation contractors and their installation equipment was used to provide a preliminary specification for the installation vessel. A typical barge was selected and a number of hydrodynamic analyses were carried out in order to establish it's on course and operational stability. The analysis proved the stability of the vessel during operation was critical and that in order to utilise the crane's full potential a stabilisation system must be employed. The main aim of the work to date was to establish whether it was feasible to use a stabilisation system on the installation vessel. The spud leg FEED study established that it was feasible to use spud legs to stabilise the vessel. In order to achieve the degree of stability required it is necessary to lift the vessel completely out of the water. This was not the original aim of the study but due to the external loads on the hull it was the only viable option. Lifting the vessel out of the water results in the legs and leg casings becoming very large. This has a number of consequences for the final design. Due to large loads on the legs spud cans must be used to avoid bottom penetration, the spud cans increase the draft of the vessel by 2m. The large loads require larger winches and more reeving to be used, this results in larger pumps and motors, all of which have to be housed. The stabilisation system has been proved to be feasible for a large installation vessel, the cost and physical size are however more excessive than first anticipated. (Author)

  2. Short assessment of the Big Five: robust across survey methods except telephone interviewing.

    Science.gov (United States)

    Lang, Frieder R; John, Dennis; Lüdtke, Oliver; Schupp, Jürgen; Wagner, Gert G

    2011-06-01

    We examined measurement invariance and age-related robustness of a short 15-item Big Five Inventory (BFI-S) of personality dimensions, which is well suited for applications in large-scale multidisciplinary surveys. The BFI-S was assessed in three different interviewing conditions: computer-assisted or paper-assisted face-to-face interviewing, computer-assisted telephone interviewing, and a self-administered questionnaire. Randomized probability samples from a large-scale German panel survey and a related probability telephone study were used in order to test method effects on self-report measures of personality characteristics across early, middle, and late adulthood. Exploratory structural equation modeling was used in order to test for measurement invariance of the five-factor model of personality trait domains across different assessment methods. For the short inventory, findings suggest strong robustness of self-report measures of personality dimensions among young and middle-aged adults. In old age, telephone interviewing was associated with greater distortions in reliable personality assessment. It is concluded that the greater mental workload of telephone interviewing limits the reliability of self-report personality assessment. Face-to-face surveys and self-administrated questionnaire completion are clearly better suited than phone surveys when personality traits in age-heterogeneous samples are assessed.

  3. A comparison of nonresponse in mail, telephone, and face-to-face surveys

    NARCIS (Netherlands)

    Hox, J.J.; Leeuw, E.D. de

    1994-01-01

    This article reports a meta-analysis of 45 studies that explicitly compare the response obtained using a mail, telephone or face-to-face survey. The data analysis uses a generalized hierarchical linear model. Sampling procedure (e.g., local convenience sample, random general sample), saliency of

  4. Is Telephone Review Feasible and Potentially Effective in Low Vision Services?

    Science.gov (United States)

    Parkes, Claire; Lennon, Julie; Harper, Robert

    2013-01-01

    Purpose: Demographic transformations within the UK population combine to contribute to a substantial increase in demand for low vision (LV) services, creating a pressing need to reconsider the appropriate methods for service provision. In this study, we evaluate the feasibility of using telephone triage to assess the need for, and timing of, LV…

  5. Assessment of mental health and illness by telephone survey: experience with an Alberta mental health survey.

    Science.gov (United States)

    Patten, Scott B; Adair, Carol E; Williams, Jeanne Va; Brant, Rollin; Wang, Jian Li; Casebeer, Ann; Beauséjour, Pierre

    2006-01-01

    Mental health is an emerging priority for health surveillance. It has not been determined that the existing data sources can adequately meet surveillance needs. The objective of this project was to explore the use of telephone surveys as a means of collecting supplementary surveillance information. A computer-assisted telephone interview was administered to 5,400 subjects in Alberta. The interview included a set of brief, validated measures for evaluating mental disorder prevalence and related variables. The individual subject response rate was 78 percent, but a substantial number of refusals occurred at the initial household contact. The age and sex distribution of the study sample differed from that of the provincial population prior to weighting. Prevalence proportions did not vary substantially across administrative health regions. There is a potential role for telephone data collection in mental health surveillance, but these results highlight some associated methodological challenges. They also draw into question the importance of regional variation in mental disorder prevalence--which might otherwise have been a key advantage of telephone survey methodologies.

  6. 76 FR 79607 - Local Number Portability Porting Interval and Validation Requirements; Telephone Number Portability

    Science.gov (United States)

    2011-12-22

    ... customer's account; a positive indication that the new service provider has the authority from the customer... comments. Email: [email protected] , and include the following words in the body of the message, ``get form.'' A... telephone number associated with the customer's account; a positive indication that the new service provider...

  7. [COOP/WONCA: Reliability and validity of the test administered by telephone].

    Science.gov (United States)

    Pedrero-Pérez, Eduardo J; Díaz-Olalla, José Manuel

    2016-01-01

    The COOP/WONCA test was initially proposed as a self-report in which the answers were supported by drawings illustrating the state investigated. Subsequent studies have confirmed its usefulness as a mere verbal self-report face-to-face administered. No data have been found about its useful when administered by telephone interview. The aim of this study was to determine the psychometric properties of the COOP / WONCA test to measure Related Quality of Life (HRQoL) administered by telephone and compare them with those obtained in other forms of prior administration. Cross-sectional study on a random. City of Madrid. Random sample of 802 adult subjects, representative of the adult population in Madrid, obtained by stratification from the population census. Questionnaire COOP/WONCA with 9 ítems included in a broader battery, administered by telephone interview. The unrestricted factor analysis points to the unifactoriality of the scale, which measures a single latent construct (HRQOL), showing high internal consistency, not significantly different from those found by face-to-face administration, ruling out the existence of biases in the phone modality. The COOP/WONCA test appears as a reliable and valid measure of HRQOL and telephonic administration allows to assume no changes in the results, which can reduce costs in population studies, increasing efficiency without loss of quality in the information collected. Copyright © 2014 Elsevier España, S.L.U. All rights reserved.

  8. 30 CFR 77.508 - Lightning arresters, ungrounded and exposed power conductors and telephone wires.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Lightning arresters, ungrounded and exposed... AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.508 Lightning... conductors and telephone wires shall be equipped with suitable lightning arresters which are adequately...

  9. Comparing a telephone- and a group-delivered diabetes prevention program

    DEFF Research Database (Denmark)

    S, Lim; Dunbar, James; Versace, Vin

    2017-01-01

    Aims To explore the acceptability of a telephone- or a group-delivered diabetes prevention program for women with previous gestational diabetes and to compare the characteristics associated with program engagement. Methods Postpartum women participated in a lifestyle modification program delivere...

  10. Assessment of real exposure to GSM mobile telephones using the SYRPOM

    International Nuclear Information System (INIS)

    Picard, D.; Fouquet, L.; Chauvin, S.

    2013-01-01

    A mobile telephone user's exposure to the radio-frequency electromagnetic field depends heavily on the power their telephone radiates, which can vary widely according to requests from the base station. This study presents the design and development of a system called System for Radiated Power Measurement (SYRPOM), which measures the power radiated by a mobile telephone. This study also describes the tests carried out on the system itself and gives the results of two measuring campaigns it has been possible to perform in this way. The first such campaign consisted of assessing the mean power received by a typical mobile telephone user carrying out various activities. The second campaign was aimed at (1) comparing the mean radiated power when stationary and when moving and (2) assessing and contrasting different models of handsets in terms of the mean radiated power. The SYRPOM has proved to be a flexible, easy-to-use high-performance and innovative tool for carrying out this kind of studies. (authors)

  11. Respondent Cooperation in Telephone Surveys: The Effects of Using Volunteer Interviewers.

    Science.gov (United States)

    Braverman, Marc T.

    1988-01-01

    The effects of using volunteer interviewers on respondent cooperation in telephone surveys were studied, using data on 241 interviews, 99 refusals, and 251 non-contacts. A random, national survey on public knowledge of and attitudes toward a county 4-H youth services program indicated respondent cooperation for professional program staff and…

  12. Employees' views on home-based, after-hours telephone triage by Dutch GP cooperatives.

    Science.gov (United States)

    Backhaus, Ramona; van Exel, Job; de Bont, Antoinette

    2013-11-04

    Dutch out-of-hours (OOH) centers find it difficult to attract sufficient triage staff. They regard home-based triage as an option that might attract employees. Specially trained nurses are supposed to conduct triage by telephone from home for after-hours medical care. The central aim of this research is to investigate the views of employees of OOH centers in The Netherlands on home-based telephone triage in after-hours care. The study is a Q methodology study. Triage nurses, general practitioners (GPs) and managers of OOH centers ranked 36 opinion statements on home-based triage. We interviewed 10 participants to help develop and validate the statements for the Q sort, and 77 participants did the Q sort. We identified four views on home-based telephone triage. Two generally favor home-based triage, one highlights some concerns and conditions, and one opposes it out of concern for quality. The four views perceive different sources of credibility for nurse triagists working from home. Home-based telephone triage is a controversial issue among triage nurses, GPs and managers of OOH centers. By identifying consensus and dissension among GPs, triagists, managers and regulators, this study generates four perspectives on home-based triage. In addition, it reveals the conditions considered important for home-based triage.

  13. 76 FR 46313 - Notice of Issuance of Final Determination Concerning Iridium Satellite Telephones

    Science.gov (United States)

    2011-08-02

    ... modulates them into radio streams that communicate with the Iridium gateway network infrastructure using a... (DSP) cores, made in China, and two radio frequency (RF) backend chips, made in Taiwan. The bill of... marking of a cellular phone. CBP found that a digital mobile telephone was substantially transformed in...

  14. Polling on a Budget: Implementing Telephone Surveys in Introductory and Advanced American Politics Courses

    Science.gov (United States)

    Williamson, Jonathan

    2011-01-01

    Research suggests that student learning is enhanced when students are engaged through active learning strategies. In studying public opinion and polling, challenges include the provision of meaningful active learning environments when resources are limited. In this article, I discuss the design and implementation of telephone surveys as a teaching…

  15. Telephone-Based Physical Activity Counseling for Major Depression in People with Multiple Sclerosis

    Science.gov (United States)

    Bombardier, Charles H.; Ehde, Dawn M.; Gibbons, Laura E.; Wadhwani, Roini; Sullivan, Mark D.; Rosenberg, Dori E.; Kraft, George H.

    2013-01-01

    Objective: Physical activity represents a promising treatment for major depressive disorder (MDD) in people with multiple sclerosis (MS). We conducted a single-blind, two-arm randomized controlled trial comparing a 12-week physical activity counseling intervention delivered primarily by telephone (n = 44) to a wait-list control group (N = 48).…

  16. Cellular telephones measure activity and lifespace in community-dwelling adults: proof of principle.

    Science.gov (United States)

    Schenk, Ana Katrin; Witbrodt, Bradley C; Hoarty, Carrie A; Carlson, Richard H; Goulding, Evan H; Potter, Jane F; Bonasera, Stephen J

    2011-02-01

    To describe a system that uses off-the-shelf sensor and telecommunication technologies to continuously measure individual lifespace and activity levels in a novel way. Proof of concept involving three field trials of 30, 30, and 21 days. Omaha, Nebraska, metropolitan and surrounding rural region. Three participants (48-year-old man, 33-year-old woman, and 27-year-old male), none with any functional limitations. Cellular telephones were used to detect in-home position and in-community location and to measure physical activity. Within the home, cellular telephones and Bluetooth transmitters (beacons) were used to locate participants at room-level resolution. Outside the home, the same cellular telephones and global positioning system (GPS) technology were used to locate participants at a community-level resolution. Physical activity was simultaneously measured using the cellular telephone accelerometer. This approach had face validity to measure activity and lifespace. More importantly, this system could measure the spatial and temporal organization of these metrics. For example, an individual's lifespace was automatically calculated across multiple time intervals. Behavioral time budgets showing how people allocate time to specific regions within the home were also automatically generated. Mobile monitoring shows much promise as an easily deployed system to quantify activity and lifespace, important indicators of function, in community-dwelling adults. © 2011, Copyright the Authors. Journal compilation © 2011, The American Geriatrics Society.

  17. Governing Practices of Cable Television and Its Relationship to the Telephone Common Carriers.

    Science.gov (United States)

    Miller, David Martin

    This dissertation examines the legislative, economic, political, and technological influences that have governed cable television (CATV) during the years of its existence. Separate chapters deal with the beginnings of CATV, the economics of CATV, the problems incurred in CATV franchising, and the relationship of CATV to the telephone common…

  18. Co-Constructing Family Identities through Young Children's Telephone-Mediated Narrative Exchanges

    Science.gov (United States)

    Cameron, Catherine Ann; Gillen, Julia

    2013-01-01

    This article explores telephone interactions between young children and adult family members as contributing insights to the co-construction of identities within both the nuclear and the extended family. The authors deploy methods of linguistic ethnography to enrich the scope of interpreting the data beyond textual analysis. The study's premise…

  19. Sleep information by Telephone: Callers Indicate Positive Effects on Sleep Problems

    NARCIS (Netherlands)

    Verbeek, I.; Declerck, G.; Knuistingh Neven, A.; Coenen, A.M.L.

    2002-01-01

    There is a need to develop effective interventions for insomnia that are readily accessible and not too expensive. For the reason that earlier studies have already shown that direct contact with a sleep therapist is not always needed, telephone service may be useful to give insomnia patients

  20. Results from the Dutch speech-in-noise screening test by telephone

    NARCIS (Netherlands)

    Smits, C.H.M.; Houtgast, T.

    2005-01-01

    OBJECTIVE: The objective of the study was to implement a previously developed automatic speech-in-noise screening test by telephone (Smits, Kapteyn, & Houtgast, 2004), introduce it nationwide as a self-test, and analyze the results. DESIGN: The test was implemented on an interactive voice response