  1. Limerick Nuclear Generating Station vibration monitoring system

    International Nuclear Information System (INIS)

    Mikulski, R.

    1988-01-01

    Philadelphia Electric Company utilizes a vibration monitoring computer system at its Limerick Nuclear Generating Station to evaluate machine performance. Performance can be evaluated through instantaneous sampling, online static and transient data. The system functions as an alarm monitor, displaying timely alarm data to the control area. The passage of time since the system's inception has been a learning period. Evaluation through continuous use has led to many enhancements in alarm handling and in the acquisition and display of machine data. Due to the system's sophistication, a routine maintenance program is a necessity. This paper describes the system's diagnostic tools and current utilization. System development and maintenance techniques will also be discussed

  2. Review insights on the probabilistic risk assessment for the Limerick Generating Station

    International Nuclear Information System (INIS)

    1984-08-01

    In recognition of the high population density around the Limerick Generating Station site and the proposed power level, the Philadelphia Electric Company, in response to NRC staff requests, conducted and submitted between March 1981 and November 1983 a probabilistic risk assessment (PRA) on internal event contributors and a severe accident risk assessment on external event contributors to assess risks posed by operation of the plant. The applicant has developed perspectives using PRA models on the safety profile of the Limerick plant and has altered the plant design to reduce accident vulnerabilities identified in these PRAs. The staff's review of the Limerick PRA has particularly emphasized the dominant accident sequences and the resulting insights into demonstration of compliance with regulatory requirments, unique design features and major plant vulnerabilities to assess the need for any additional measures to further improve the safety of the LGS. The staff's review insights and PRA safety review conclusions are presented in this report

  3. Final environmental statement related to the operation of Limerick Generating Station, Units 1 and 2, Docket Nos. 50-352 and 50-353, Philadelphia Electric Company

    International Nuclear Information System (INIS)

    1989-08-01

    In April 1984 the staff of the Nuclear Regulatory Commission issued its Final Environmental Statement (NUREG-0974) related to the operation of Limerick Generating Station, Units 1 and 2, (Docket Nos. 50-352 and 50-353), located on the Schuylkill River, near Pottstown, in Limerick Township, Montgomery and Chester Counties, Pennsylvania. The NRC has prepared this supplement to NUREG-0974 to present its evaluation of the alternative of facility operation with the installation of further severe accident mitigation design features. The NRC staff has discovered no substantial changes in the proposed action as previously evaluated in the Final Environmental Statement that are relevant to environmental concerns nor significant new circumstances or information relevant to environmental concerns and bearing on the licensing of Limerick Generating Station, Units 1 and 2. 15 refs., 10 tabs

  4. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement 2

    International Nuclear Information System (INIS)

    1984-10-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the applicant) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. This supplement addresses further issues that require resolution and closes them out

  5. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. A license for the operation of Limerick Unit 1 was issued on October 26, 1984. The license, which was restricted to a five percent power level, contained conditions which required resolution prior to proceeding beyond the five percent power level. Supplement 4, issued in May 1985, addressed some of these issues. Supplement 4 also contained the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984, regarding full power operation of Limerick Unit 1. Supplement 5, issued in July 1985, and this Supplement 6 address further issues, principally the status of offsite emergency planning, that require resolution prior to proceeding beyond the five percent power level

  6. Technical specifications, Limerick Generating Station, Unit No. 2 (Docket No. 50-353)

    International Nuclear Information System (INIS)

    1989-07-01

    The Limerick, Unit 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  7. Technical Specifications, Limerick Generating Station, Unit No. 2 (Docket No. 50-353)

    International Nuclear Information System (INIS)

    1989-08-01

    The Limerick, Unit 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  8. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 4

    International Nuclear Information System (INIS)

    1985-05-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the applicant) for licenses to operate the Limerick Generating Station, Units 1 and 2 located on a site in Montgomery and Chester Counties, Pennsylvania. A license (NPF-27) for the operation of Limerick Unit 1 was issued on October 26, 1984. The license, which was restricted to a five percent power level, contained conditions which required resolution prior to proceeding beyond the five percent power level. This Supplement 4 to the SER addresses some of those technical issues and their associated license conditions which require resolution prior to proceeding beyond the five percent power level. The remaining issues to be addressed prior to proceeding beyond the five percent power level will be addressed in a later supplement to this report. This Supplement 4 to the SER also contains the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984, regarding full power operation of Limerick Unit 1

  9. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1989-06-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 to NUREG-0991 was issued in December 1983. Supplements 2 and 3 were issued in October 1984. License NPF-27 for the low-power operation of Limerick Unit 1 was issued on October 26, 1984. Supplement 4 was issued in May, 1985, Supplement 5 was issued in July 1985, and Supplement 6 was issued in August 1985. These supplements addressed further issues that required resolution before Unit 1 proceeded beyond the 5-percent power level. The full-power operating license for Limerick Unit 1 (NPF-39) was issued August 8, 1985, and the unit has completed two cycles of operation. Supplement 7 was issued April 1989 to address some of the few significant design differences between Units 1 and 2, the resolution of issues that remained open when the Unit 1 full-power license was issued and an assessment of some of the issues that required resolution before issuance of an operating license for Unit 2. This supplement addresses the remaining issues that required resolution before issuance of and operating license for Unit 2

  10. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352-50-353). Supplement 1

    International Nuclear Information System (INIS)

    1983-12-01

    This report supplements the Safety Evaluation Report (NUREG-0991, August 1983) for the application filed by the Philadelphia Electric Company, as applicant and owner, for licenses to operate the Limerick Generating Station Units 1 and 2 (Docket Nos. 50-352 and 50-353). The facility is located near Pottstown, Pennsylvania. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  11. Safety-evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1983-08-01

    The Safety Evaluation Report for the application filed by the Philadelphia Electric Company, as applicant and owner, for licenses to operate the Limerick Generating Station Units 1 and 2 (Docket Nos. 50-352 and 50-353), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located near Pottstown, Pennsylvania. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  12. Draft environmental statement related to the operation of Limerick Generating Station, Units 1 and 2. Docket Nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1983-06-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Limerick Generating Station, Units 1 and 2, pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights of way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity

  13. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement 3

    International Nuclear Information System (INIS)

    1984-10-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the applicant) for licenses to operate the Limerick Generating Station, Units 1 and 2. Supplement 1 was issued in December 1983 and addressed several outstanding issues. Supplement 1 also contains the comments made by the Advisory Committee on Reactor Safeguards in its report dated October 18, 1983. Supplement 2 was issued in October 1984 and addressed fourteen outstanding and fifty-three confirmatory issues and closed them put. This Supplement 3 addresses the remaining issues that require resolution before issuance of the operating license for Unit 1 and closes them out

  14. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 5

    International Nuclear Information System (INIS)

    1985-07-01

    In August 1983 the NRC issues its Safety Evaluation Report regarding the application for licenses to operate the Limerick Generating Station, Units 1 and 2 located on a site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 was issued in December 1983 and addressed several outstanding issues. SSER 1 also contains the comments made by the Advisory Committee on Reactor Safeguards in its interim report dated October 18, 1983. Supplement 2 was issued in October 1984. Supplement 3 was issued in October 1984 and addressed the remaining issues that required resolution before issuance of the operating licence for Unit 1. On October 26, 1984 a license (NPF-27) for Unit 1 was issued which was restricted to a five percent power level and contained conditions which required resolution prior to proceeding beyond the five percent power level. Supplement 4 issued in May 1985 addressed some of the technical issues and their associated license conditions, which required resolution prior to proceeding beyond the five percent power level. SSER 4 also contained the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984. This Supplement 5 to the SER addresses further issues that require resolution prior to proceeding beyond the five percent power level

  15. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2, Docket nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1989-08-01

    In August 1983 the staff of the Nuclear Regulatory commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for the licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 was issued in December 1983. Supplement 2 was issued in October 1984. Supplement 3 was issued in October 1984. Supplement 4 was issued in May 1985. Supplement 5 was issued in July 1985. Supplement 6 was issued in August 1985 and Supplement 7 was issued in April 1989. Supplement 7 addresses the major design differences between Units 1 and 2, the resolution of all issues that remained open when the Unit 1 full-power license was issued, the staff's assessment regarding the application by the licensee to operate Unit 2 and issues that require resolution before issuance of an operating license for Unit 2. Supplements 8 and 9 address further issues that require resolution prior to issuance of an operating license. 1 tab

  16. Point Lepreau generating station

    International Nuclear Information System (INIS)

    Ganong, G.H.D.; Strang, A.E.; Gunter, G.E.; Thompson, T.S.

    Point Lepreau-1 reactor is a 600 MWe generating station expected to be in service by October 1979. New Brunswick is suffering a 'catch up' phenomenon in load growth and needs to decrease dependence on foreign oil. The site is on salt water and extensive study has gone into corrosion control. Project management, financing and scheduling have unique aspects. (E.C.B.)

  17. SENTINEL trademark technical basis report for Limerick. Final report

    International Nuclear Information System (INIS)

    Burns, E.T.; Lee, L.K.; Mitman, J.T.; Vanover, D.E.; Wilson, D.K.

    1997-12-01

    PECO Energy in cooperation with the Electric Power Research Institute (EPRI) installed the SENTINEL trademark software at its Limerick Generating Station. This software incorporates models of the safety and support systems which are used to display the defense in depth present in the plant and a quantitative assessment of the plant risks during proposed on-line maintenance. During the past year, PECO Energy personnel have used this display to evaluate the safety of proposed on-line maintenance schedules. The report describes the motivation for and the development of the SENTINEL software. It describes the generation of Safety Function Assessment Trees and Plant Transient Assessment Trees and their use in evaluating the level of defense-in-depth of key plant safety functions and the susceptibility of the plant to critical transient events. Their results are displayed by color indicators ranging from green, through yellow and orange to red to show increasingly hazardous conditions. The report describes the use of the Limerick Probabilistic Safety Assessment within the SENTINEL code to calculate an instantaneous core damage frequency and the criteria by which this frequency is translated to a color indicator. Finally, the report describes the Performance Criteria Assessment which tracks and trends system/train unavailability to document conformance to the requirements of the Maintenance Rule

  18. Limerick, City and County

    OpenAIRE

    2011-01-01

    Postcard. Colour drawings of maps of Limerick city and county and Foynes - transatlantic air base flying boat, Dromore Castle, Glenstal Abbey, Ardagh Chalice, Askeaton; the Abbey, Gate Loge Adare Manor, Newcastlewest, King John's Castle, St. Mary's Cathedral (Church of Ireland), The Old Custom House, The Hunt Museum, The Old Mill and Bridge croom, The Coll (de Valera) Cottage Buree, Town Gate Kilmallock, Lough Gur Interpretive Centre, Hospital Ancient hostelry and The Treaty Stone. Copyright ...

  19. Limerick Clare Energy Plan

    DEFF Research Database (Denmark)

    Connolly, David; Mathiesen, Brian Vad; Dubuisson, Xavier

    2012-01-01

    at a national level, but they need to be supplemented by local plans also, since the most successful renewable energy projects to date are at a local level. For example, it is evident from the transition to renewable energy in Denmark, that 100% renewable energy systems can already be implemented at a local...... level. Hence, by initiating local action, national targets can be met and exceeded, while also creating a template for a wider transition to renewable energy. Accordingly, the primary goal of the project is: To develop a local energy plan for Limerick and Clare which is based on a quantified assessment...

  20. Limerick Clare Energy Plan

    DEFF Research Database (Denmark)

    Connolly, David; Mathiesen, Brian Vad; Dubuisson, Xavier

    2012-01-01

    The Limerick-Clare Region (LCR) has a long history of innovation within the energy sector in Ireland, which includes the construction of Ireland’s largest hydro plant, Ardnacrusha, in the late 1920’s as well as Ireland’s largest power plant, Moneypoint, in the 1980’s. Currently, energy systems...... worldwide are facing a new challenge, to transition to low-carbon sustainable forms of energy and therefore, the LCR has the opportunity to become a leading innovator within the energy sector once again. This study investigates how the LCR can begin the transition to a sustainable energy system by outlining...... some key actions between now and 2020. Furthermore, a long-term vision is also presented to illustrate how these actions contribute to the final objective of a low-carbon 100% renewable energy system....

  1. Limerick BWR turbine control and protection system upgrade success

    International Nuclear Information System (INIS)

    Tang, C.K.; Pietryka, T.S.; Federico, P.A.; Williams, J.C.

    2015-01-01

    Westinghouse and Exelon have successfully implemented a digital electro-hydraulic control (DEHC) at Limerick BWR Unit 1 Station to perform the turbine control, protection and reactor pressure functions. The DEHC replaces analog controls and addressed system performance, obsolescence and reliability. This was a first-of-a-kind application for control and protection of the main turbine and BWR pressure control for the distributed control system utilized. The demolition of analog equipment, main control room and front standard modifications, and acceptance testing were completed on schedule during the normal 2014 outage. Key aspects of the project that facilitated this success will be discussed and presented. (author)

  2. Limerick BWR turbine control and protection system upgrade success

    Energy Technology Data Exchange (ETDEWEB)

    Tang, C.K.; Pietryka, T.S.; Federico, P.A., E-mail: tangck@westinghouse.com, E-mail: pietryt@westinghouse, E-mail: federipa@westinghouse.com [Westinghouse Electric Company, LLC, Cranberry Township, PA (United States); Williams, J.C., E-mail: Jonathan.Williams@exeloncorp.com [Exelon Nuclear, Warrenville, IL (United States)

    2015-07-01

    Westinghouse and Exelon have successfully implemented a digital electro-hydraulic control (DEHC) at Limerick BWR Unit 1 Station to perform the turbine control, protection and reactor pressure functions. The DEHC replaces analog controls and addressed system performance, obsolescence and reliability. This was a first-of-a-kind application for control and protection of the main turbine and BWR pressure control for the distributed control system utilized. The demolition of analog equipment, main control room and front standard modifications, and acceptance testing were completed on schedule during the normal 2014 outage. Key aspects of the project that facilitated this success will be discussed and presented. (author)

  3. Technical specifications Limerick Generating Station, Unit No.1 (Docket No. 50-352). Appendix ''A'' to License No. NPF-39

    International Nuclear Information System (INIS)

    1985-06-01

    The specifications include: definitions, safety limits and limiting safety system settings, bases, limiting conditions for operation and surveillance requirements, design features, and administrative controls

  4. Environmental assessment, proposed generating station for Darlington

    International Nuclear Information System (INIS)

    1975-04-01

    This document indicates the intention of Ontario Hydro to seek approval from the Provincial Government for its plan to construct and operate a 3400 MWe nuclear generating station at the Darlington site, west of Bowmanville. This preliminary proposal also contains the environmental assessment. The environmental section of this proposal describes and assesses the existing environment and the environmental influences which would occur due to the construction and operation of a nuclear generating station, consisting of four 850 MW units, at the Darlington site. This proposed station is similar to the Bruce GS A station presently under construction. (author)

  5. Dose management programmes at Kaiga Generating Station

    International Nuclear Information System (INIS)

    Vijayan, P.; Prabhakaran, V.; Managavi, Sadashiv B.; Danannavar, Veerendra; Biju, P.; Manoj Kumar, M.; Shrikrishna, U.V.

    2001-01-01

    Kaiga Generating Station (KGS) has two units of pressurized heavy water reactors of 220 MWe each capacity. KGS-2 started power generation since 1999 and KGS-1 since 2000. Several programmes such as assessment of radioactive condition, training on radiological safety aspects, job planning in radioactive areas, etc. are conducted periodically to implement an effective dose control programmes in KGS. These efforts are briefly discussed in this report. Facilities and techniques to implement ALARA programs are also highlighted in this report. (author)

  6. Los cuentos limerick de Silvina Ocampo

    Directory of Open Access Journals (Sweden)

    Natalia Biancotto

    2016-06-01

    Full Text Available Este trabajo presenta una lectura de tres relatos paradigmáticos del nonsense ocampiano en su inflexión Lear, “El automóvil”, “Sábanas de tierra” y “La pista de hielo y de fuego”, de la compilación titulada Y así sucesivamente (1987. Se sabe que Silvina Ocampo leía a Edward Lear, aunque no es posible afirmar que haya querido imitarlo, rendirle homenaje o escribir relatos a la manera de limericks. Sí se puede, en cambio, leer estos cuentos a partir del modo en que los atraviesan ciertos rasgos propios del nonsense de Lear. La hipótesis de trabajo afirma que en ellos aparece, desprendida de la rima, la estructura narrativa efímera del limerick, que trastorna la forma del relato y la impregna de fugacidad y tontería. El lector se encuentra entonces con cuentos anómalos, de raras formas breves, con aire de inconclusos. Son historias mínimas en las que casi no hay narración, puesto que una sola anécdota insignificante ocupa, como en los limericks de Lear, el espacio todo del relato.

  7. Performance assessment of Point Lepreau Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Alikhan, S [Point Lepreau Generating Station, Lepreau, NB (Canada)

    1991-04-01

    The Point Lepreau Generating Station, a 680 MWe CANDU unit, is located about 40 km southwest of the city of Saint John, New Brunswick, Canada. It was declared in-service on 1 February, 1983 and, since then, has demonstrated an average cross capacity factor of over 93% up to the end of 1990. This paper compared the performance of the station with other sister CANDU units and the Light Water Reactors world-wide using the following ten performance indicators, as applicable: - gross capacity factor; - fuel burn-up; - heavy water upkeep; - unplanned reactor trips while critical; - forced outage rate; - fuel handling performance; - derived emission of radioactive effluents to environment; - personnel radiation dose; - industrial safety; - low-level solid radioactive wastes. The paper examines various areas of station activities including management and organization, operations and maintenance, technical support, fuel handling and health physics in order to highlight some of the 'good practices' which are believed to have made a significant contribution towards achieving the demonstrated performance of Point Lepreau G.S. In addition, several areas of potential improvement are discussed in order to maintain and enhance, where practicable, the safety, reliability and economic performance of the station. In this context, a careful review of the operating experiences, both in-house and at other stations, and a judicious application of lessons learned plays a significant role. (author)

  8. Performance assessment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Alikhan, S.

    1991-01-01

    The Point Lepreau Generating Station, a 680 MWe CANDU unit, is located about 40 km southwest of the city of Saint John, New Brunswick, Canada. It was declared in-service on 1 February, 1983 and, since then, has demonstrated an average cross capacity factor of over 93% up to the end of 1990. This paper compared the performance of the station with other sister CANDU units and the Light Water Reactors world-wide using the following ten performance indicators, as applicable: - gross capacity factor; - fuel burn-up; - heavy water upkeep; - unplanned reactor trips while critical; - forced outage rate; - fuel handling performance; - derived emission of radioactive effluents to environment; - personnel radiation dose; - industrial safety; - low-level solid radioactive wastes. The paper examines various areas of station activities including management and organization, operations and maintenance, technical support, fuel handling and health physics in order to highlight some of the 'good practices' which are believed to have made a significant contribution towards achieving the demonstrated performance of Point Lepreau G.S. In addition, several areas of potential improvement are discussed in order to maintain and enhance, where practicable, the safety, reliability and economic performance of the station. In this context, a careful review of the operating experiences, both in-house and at other stations, and a judicious application of lessons learned plays a significant role. (author)

  9. Wolf Creek Generating Station containment model

    International Nuclear Information System (INIS)

    Nguyen, D.H.; Neises, G.J.; Howard, M.L.

    1995-01-01

    This paper presents a CONTEMPT-LT/28 containment model that has been developed by Wolf Creek Nuclear Operating Corporation (WCNOC) to predict containment pressure and temperature behavior during the postulated events at Wolf Creek Generating Station (WCGS). The model has been validated using data provided in the WCGS Updated Safety Analysis Report (USAR). CONTEMPT-LT/28 model has been used extensively at WCGS to support plant operations, and recently, to support its 4.5% thermal power uprate project

  10. Review of freeboard: Grand Rapids Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Groeneveld, J.L.; Harding, W.B.; Bonin, D.V.; Fuchs, D.M. [Acres Manitoba Ltd., Winnipeg, MB (Canada); Warner, B.J. [Manitoba Hydro, Winnipeg, MB (Canada)

    2001-10-01

    Constructed during the period 1960-1965, the Grand Rapids Generating Station is a 472 MW hydroelectric station located approximately 400 kilometres northwest of Winnipeg, Manitoba, on the Saskatchewan River. An intake structure, four penstocks, a four-unit plus house unit powerhouse, wing walls, extensive dyke structures and a four-bay spillway are the components of the generating station. A little over ten years ago, the Manitoba Hydro Dam Safety Program was initiated. The program included a detailed dam safety review of the Grand rapids Generating Station. A potential deficiency in the freeboard allowance for several of the earthen dykes was revealed by the review process. The dam safety guidelines sponsored by the Canadian Dam Association were not met. The occurrence of a 1:1000 year wind event from the critical direction when the reservoir was at or near its full supply level was compounded by the analysis. The establishment of a wind and wave monitoring program was included in the deficiency studies commissioned. The objective was to confirm the empirical estimates concerning wave height, the development and usage of a two dimensional numerical wave model, and additional freeboard analyses to refine estimates of the recurrence interval of the current level of protection. A statistical Monte Carlo analysis was performed in the case of the estimates of the recurrence interval to determine the joint probabilities of seasonal variations in wind direction, wind speed, and reservoir level. The estimate of the actual risk of overtopping was therefore refined, and the details pertaining to the methodology and the conclusions of the analysis are all included in the paper. 15 refs., 4 tabs., 9 figs.

  11. Report on Darlington nuclear generating station

    International Nuclear Information System (INIS)

    1985-12-01

    The Select Committee on Energy was appointed on July 10, 1985 by the Legislative Assembly of the Province of Ontario in order to inquire into and report on Ontario Hydro affairs within ten months. Two sessions were planned the first of which was a review of the Darlington Nuclear Generating Station. Darlington is a large, 4 unit nuclear-powered electricity generating station currently under construction on the shore of Lake Ontario in the town of Newcastle. At the time the Committee met, construction had been underway for over four years. The first two units are scheduled to become operational in 1988 and 1989 with the second two scheduled to become operational in 1991 and 1992. The total estimated cost of the station is $10.895 billion of which $3.66 billion has been spent and $3.385 billion has been committed. Though the nuclear industry has been a major area of investment in Ontario over the past decade, the demand for electrical power from nuclear stations has been significantly decreased. This report focusses on the need for Darlington and public policy issues involved in planning and completing it. The Committee proposed the following recommendations: 1) The relationship between the Government of Ontario and Ontario Hydro and their individual responsibilities should be clarified. 2) An independent review of the Ontario Hydro demand/supply options should be carried out. 3) No further significant contracts for Darlington units 3 and 4 should be let for materials not required for construction during the next 6 months while the Committee studies demand and supply options

  12. Physical degradation assessment of generator station cables

    International Nuclear Information System (INIS)

    Stonkus, D.J.

    1988-01-01

    Preliminary studies of fossil-fired and nuclear generator station cables indicate that the low voltage PVC insulated cables are in relatively good condition. The insulation is flexible and in the case of nuclear cables can withstand a design basis event after nearly 15 years of service. Cables insulated with styrene butadiene rubber have been found embrittled and cables insulated with SBR should be closely inspected in any plant assurance program. Thermal analysis using oxidative induction technique shows promise to indicate cable insulation degradation. Long term reliability assurance and plant life extension studies are being actively pursued at Ontario Hydro. A major study is currently underway to extend the life of the oldest operating fossil-fuel station, the 8-unit, 2400 MW Lakeview TGS in operation since the 1960s. Plant life assurance programs have been initiated at the 2000 MW Lambton TGS in operation since 1969, and for the oldest operating nuclear plant, Pickering NGS A in operation since the early 1970s. As cables are considered one of the critical components in a generator station due to the extreme difficulty and cost of cable replacement, test programs have been initiated to evaluate the physical degradation of the cables and relate the results to electrical diagnostic tests and to chemical changes. The decommissioning of two small nuclear stations, the 20 MW Nuclear Power Demonstration (NPD) and the 200 MW Douglas Point NGS, which were placed in service in 1962 and 1967 respectively, will provide an opportunity to perform destructive electrical and physical evaluation on field aged cables

  13. Refurbishment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Thompson, P.D.; Jaitly, R.; Ichiyen, N.; Petrilli, M.A.

    2004-01-01

    NB Power is planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube Assemblies and the connecting feeder pipes. This activity is referred to as Retube. NB Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope of the project was determined from the outcome of a two-year study involving a detailed condition assessment of the station that examined issues relating to ageing and obsolescence. The majority of the plant components were found to be capable of supporting extended operation without needing replacement or changes. In addition to the condition assessment, a detailed review of Safety and Licensing issues associated with extended operation was performed. This included a review of known regulatory and safety issues, comparison of the station against current codes and standards, and comparison of the station against safety related modifications made to more recent CANDU 6 units. Benefit cost analyses (BCA) were performed to assist the utility in determining which changes were appropriate to include in the project scope. As a Probabilistic Safety Assessment (PSA) for PLGS did not exist at the time, a risk baseline for the station had to be determined for use in the BCA. Extensive dialogue with the Canadian Nuclear Safety Commission staff was also undertaken during this phase. A comprehensive Licensing Framework was produced upon which the CNSC provided feedback to NB Power. This feedback was important in terms of

  14. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  15. 76 FR 19148 - PSEG Nuclear, LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1...

    Science.gov (United States)

    2011-04-06

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-272, 50-311, 50-354; NRC-2009-0390 and NRC-2009-0391] PSEG Nuclear, LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2..., DPR-70, and DPR-75 for an additional 20 years of operation for the Hope Creek Generating Station (HCGS...

  16. Next Generation Hydrogen Station Composite Data Products: Retail Stations, Data through Quarter 4 of 2016

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Sam [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Chris [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Peters, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-05-31

    This publication includes 86 composite data products (CDPs) produced for next generation hydrogen stations, with data through the fourth quarter of 2016. These CDPs include data from retail stations only.

  17. Next Generation Hydrogen Station Composite Data Products: Retail Stations, Data through Quarter 2 of 2017

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Samuel [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer M [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Peters, Michael C. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-12-05

    This publication includes 92 composite data products (CDPs) produced for next generation hydrogen stations, with data through the second quarter of 2017. These CDPs include data from retail stations only.

  18. 75 FR 6223 - PSEG Nuclear LLC; Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1...

    Science.gov (United States)

    2010-02-08

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-272, 50-311 and 50-354; NRC-2010-0043] PSEG Nuclear LLC; Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2...-70, and DPR-75, issued to PSEG Nuclear LLC (PSEG, the licensee), for operation of the Hope Creek...

  19. Activity transport in nuclear generating stations

    International Nuclear Information System (INIS)

    Mitchell, A.B.

    1975-01-01

    The objective of this paper is to give a basic understanding of the operational limitations caused by radiation fields in the present design of CANDU-PHW reactors. A simple model of activity transport is described, and the significance of various radioisotopes identified. The impact which radiation fields have at the Divisional, Station Manager and Operation levels, is outlined in the context of typical work situations. (author)

  20. Dam safety at Seven Sisters Generating Station

    International Nuclear Information System (INIS)

    Carson, R. W.; Gupta, R. C.

    1996-01-01

    A safety surveillance program for all hydraulic structures in Manitoba was first implemented in 1979, and updated in 1988. This contribution describes the current status of the program, and the nature of the issues that the program was designed to address. The Seven Sisters Station's dam on the Winnipeg River, about 90 km northeast of the City of Winnipeg, was used as an example. Extensive reviews of flood risks and downstream inundation potential at Seven Sisters' revealed a number of deficiencies; these findings will be incorporated into a corporate plan of overall remediation. Updating the program will also include efforts to ensure adherence to national dam safety guidelines. 5 figs

  1. From inventivity in Limerick to creativity in Aveiro: lessons learnt

    CSIR Research Space (South Africa)

    Wong, W

    2009-01-01

    Full Text Available This paper describes the key lessons from an earlier HCI Educators’ conference, held in Limerick in 2006, the outcomes of which led to the theme of HCIEd 2007 – Creativity: Experiencing to Educate and Design. The paper discusses the lessons leant...

  2. Nuclear power generation modern power station practice

    CERN Document Server

    1971-01-01

    Nuclear Power Generation focuses on the use of nuclear reactors as heat sources for electricity generation. This volume explains how nuclear energy can be harnessed to produce power by discussing the fundamental physical facts and the properties of matter underlying the operation of a reactor. This book is comprised of five chapters and opens with an overview of nuclear physics, first by considering the structure of matter and basic physical concepts such as atomic structure and nuclear reactions. The second chapter deals with the requirements of a reactor as a heat source, along with the diff

  3. ALGORITHM TO CHOOSE ENERGY GENERATION MULTIPLE ROLE STATION

    Directory of Open Access Journals (Sweden)

    Alexandru STĂNESCU

    2014-05-01

    Full Text Available This paper proposes an algorithm that is based on a complex analysis method that is used for choosing the configuration of a power station. The station generates electric energy and hydrogen, and serves a "green" highway. The elements that need to be considered are: energy efficiency, location, availability of primary energy sources in the area, investment cost, workforce, environmental impact, compatibility with existing systems, meantime between failure.

  4. The paperclip and the nuclear generating station

    International Nuclear Information System (INIS)

    Mussard, J.A.

    1981-01-01

    The article presents some reflections upon the circumstances of the recent rejection by the Swiss Federal Government of a project for building a nuclear generating plant at Kaiseraugst. The following points are made: The use of conventional publicity and public relations techniques to try to convince the public of the desirability or at least of the harmlessness of such projects may very well be counter-productive, given the public's not altogether ill-founded suspicion of such types of pressure. Nor is it helpful to accuse opponents of nuclear developments of indulging in emotional reaction, emotion being entirely legitimate. The proponents of such schemes should confine themselves to objective discussion of the questions Where How Why and At what cost (cost being interpreted in the widest, not merely financial, sense). They should avoid the trap of appearing to be for (as distinct from against) nuclear energy. Finally both sides should abjure (and so far as possible the community should outlaw) methods of conducting disputes that border on lying, charlatanism, demagogy and above all, illegality, and confine themselves to serious discussion of the questions that arise, which are far from being confined to technology and economics. (C.J.O.G.)

  5. Naturalization of landscaped parkland at Ontario Hydro's Nanticoke generating station

    International Nuclear Information System (INIS)

    McKenna, G.R.

    1998-01-01

    The implementation of a program for the naturalization of Nanticoke Park, a 30 hectare area located on the property of Ontario Hydro's Nanticoke Generating Station was discussed. The station, which is located in southern Ontario very near to noted wildlife areas, is the largest coal-fired generating station in North America. Naturalization of Nanticoke Park began with passive naturalization of interior areas. An active naturalization program involving four to five hectare size areas annually was begun in 1997, to be completed over a five -year period. This presentation described the site preparation, planting methods, post-planting tending methods, survival assessment of planted areas, and scientific research initiatives including mulch trials with zebra mussel shells to increase soil moisture. The lessons learned from the two year experiment in determining the optimum planting strategy and methods were described. 7 refs., 1 tab

  6. FIND: Douglas Point Nuclear Generating Station, Units 1 and 2

    International Nuclear Information System (INIS)

    Moore, M.M.

    1975-12-01

    This index is presented as a guide to microfiche items 1 through 136 in Docket 50448, which was assigned to Potomac Electric Power Company's Application for Licenses to construct and operate Douglas Point Nuclear Generating Station, Units 1 and 2. Information received from August, 1973 through July, 1975 is included

  7. Trends in the capital costs of CANDU generating stations

    International Nuclear Information System (INIS)

    Yu, A.M.

    1982-09-01

    This paper consolidates the actual cost experience gained by Atomic Energy of Canada Limited, Ontario Hydro, and other Canadian electric utlities in the planning, design and construction of CANDU-PHWR (CANada Deuterium Uranium-Pressurized Heavy Water Reactor) generating stations over the past 30 years. For each of the major CANDU-PHWR generating stations in operation and under construction in Canada, an analysis is made to trace the evolution of the capital cost estimates. Major technical, economic and other parameters that affect the cost trends of CANDU-PHWR generating stations are identified and their impacts assessed. An analysis of the real cost of CANDU generating stations is made by eliminating interest during construction and escalation, and the effects of planned deferment of in-service dates. An historical trend in the increase in the real cost of CANDU power plants is established. Based on the cost experience gained in the design and construction of CANDU-PHWR units in Canada, as well as on the assessment of parameters that influence the costs of such projects, the future costs of CANDU-PHWRs are presented

  8. Valve maintainability in CANDU-PHW nuclear generating stations

    International Nuclear Information System (INIS)

    Pothier, N.E.; Crago, W.A.

    1977-09-01

    Design, application, layout and administrative factors which affect valve maintainability in CANDU-PHW power reactors are identified and discussed. Some of these are illustrated by examples based on prototype reactor operation experience. Valve maintainability improvements resulting from laboratory development and maintainability analysis, have been incorporated in commercial CANDU-PHW nuclear generating stations. These, also, are discussed and illustrated. (author)

  9. Dispersion of chlorine at seven southern California coastal generating stations

    International Nuclear Information System (INIS)

    Grove, R.S.

    1983-01-01

    The objectives of this study were to (1) determine chlorine concentrations and exposure time gradients of chlorine through seven coastal generating stations and (2) assess the dispersion characteristics of chlorine in the receiving waters. Remarkable variability in chlorine injection concentrations, condenser outlet concentrations, outfall concentrations, and dissipation rates between generating stations and, to a lesser extent, between surveys at the same generating station was found in this chlorine monitoring study. Other than quite consistent low injection and correspondingly low outfall concentrations at San Onofre (a generating station that had one of the more rigorous chlorine control and minimization programs in effect at the time), no recognizable patterns of chlorination could be discerned in the data. Over half of the outfall chlorine surveys had chlorine concentrations below 0.08 mg/L, which is the accepted level of detection for the titrator being used in the surveys. The post-outfall dilution calculations further showed that the chlorine that does enter the receiving water is initially diluted with entrained ambient water at a ratio of 5.2:19.0

  10. Ontario Hydro Pickering Generating Station fuel handling system performance

    International Nuclear Information System (INIS)

    Underhill, H.J.

    1986-01-01

    The report briefly describes the Pickering Nuclear Generating Station (PNGS) on-power fuel handling system and refuelling cycle. Lifetime performance parameters of the fuelling system are presented, including station incapability charged to the fuel handling system, cost of operating and maintenance, dose expenditure, events causing system unavailability, maintenance and refuelling strategy. It is concluded that the 'CANDU' on-power fuelling system, by consistently contributing less than 1% to the PNGS incapability, has been credited with a 6 to 20% increase in reactor capacity factor, compared to off-power fuelling schemes. (author)

  11. Computer functions in overall plant control of candu generating stations

    International Nuclear Information System (INIS)

    Chou, Q.B.; Stokes, H.W.

    1976-01-01

    System Planning Specifications form the basic requirements for the performance of the plant including its response to abnormal situations. The rules for the computer control programs are devised from these, taking into account limitations imposed by the reactor, heat transport and turbine-generator systems. The paper outlines these specifications and the limitations imposed by the major items of plant equipment. It describes the functions of each of the main programs, their interactions and the control modes used in the existing Ontario Hydro's nuclear station or proposed for future stations. Some simulation results showing the performance of the overall unit control system and plans for future studies are discussed. (orig.) [de

  12. A Renewably Powered Hydrogen Generation and Fueling Station Community Project

    Science.gov (United States)

    Lyons, Valerie J.; Sekura, Linda S.; Prokopius, Paul; Theirl, Susan

    2009-01-01

    The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

  13. Tritium in groundwater investigation at the Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    DeWilde, J.; Yu, L.; Wootton, R.; Belanger, D.; Hansen, K.; McGurk, E.; Teare, A.

    2001-01-01

    Ontario Power Generation Inc. (OPG) investigated tritium in groundwater at the Pickering Nuclear Generating Station (PNGS). The objectives of the study were to evaluate and define the extent of radionuclides, primarily tritium, in groundwater, investigate the causes or sources of contamination, determine impacts on the natural environment, and provide recommendations to prevent future discharges. This paper provides an overview of the investigations conducted in 1999 and 2000 to identity the extent of the tritium beneath the site and the potential sources of tritium released to the groundwater. The investigation and findings are summarized with a focus on unique aspects of the investigation, on lessons learned and benefits. Some of the investigative techniques discussed include process assessments, video inspections, hydrostatic and tracer tests, Helium 3 analysis for tritium age dating, deuterium and tritium in soil analysis. The investigative techniques have widespread applications to other nuclear generating stations. (author)

  14. Electricity pricing model in thermal generating stations under deregulation

    International Nuclear Information System (INIS)

    Reji, P.; Ashok, S.; Moideenkutty, K.M.

    2007-01-01

    In regulated public utilities with competitive power markets, deregulation has replaced the monopoly. Under the deregulated power market, the electricity price primarily depends on market mechanism and power demand. In this market, generators generally follow marginal pricing. Each generator fixes the electricity price based on their pricing strategy and it leads to more price volatility. This paper proposed a model to determine the electricity price considering all operational constraints of the plant and economic variables that influenced the price, for a thermal generating station under deregulation. The purpose of the model was to assist existing stations, investors in the power sector, regulatory authorities, transmission utilities, and new power generators in decision-making. The model could accommodate price volatility in the market and was based on performance incentive/penalty considering plant load factor, availability of the plant and peak/ off peak demand. The model was applied as a case study to a typical thermal utility in India to determine the electricity price. It was concluded that the case study of a thermal generating station in a deregulated environment showed that the electricity price mainly depended on the gross calorific value (GCV) of fuel, mode of operation, price of the fuel, and operating charges. 11 refs., 2 tabs., 1 fig

  15. The Misema generating station by CREC : the journey

    International Nuclear Information System (INIS)

    2003-01-01

    The Canadian Renewable Energy Corporation (CREC) was created in 2000 in response to the government's commitment to renewable energy. This publication presents a series of photographs illustrating the development of the Misema run-of-the river hydro generating station, including its 300 m long power tunnel from the intake to the powerhouse. The Misema project was the first in Ontario to run an underground tunnel to protect the river bank and reduce visual impact. It was also the first to have an underground power house that could withstand the 1 in 1,000 year flood. Connection to the grid is via a private 44,000 volt line. The station is fully automated to meet Ontario's power demand. Engineering and environmental approval for the project began in 2001, with construction starting in May 2001. The generating facility uses natural river flow to generate electricity, and is expected to play an important role in strengthening the electricity grid at its periphery and offer reliable power to thousands of customers. Small hydro also has minimal impact on the environment. CREC intends to make the site accessible to recreational canoeists, fishermen, geologists and tourists. The generating station was nearly completely constructed by local tradesmen and contractors, creating about 30,000 man-hours for the Englehart area. The Misema facility is contributing to Ontario's deregulated power market and has provided much needed electricity while reducing Ontario's greenhouse gas emissions. The facility was built to the highest international standards. figs

  16. Navajo Generating Station and Air Visibility Regulations: Alternatives and Impacts

    Energy Technology Data Exchange (ETDEWEB)

    Hurlbut, D. J.; Haase, S.; Brinkman, G.; Funk, K.; Gelman, R.; Lantz, E.; Larney, C.; Peterson, D.; Worley, C.; Liebsch, E.

    2012-01-01

    Pursuant to the Clean Air Act, the U.S. Environmental Protection Agency (EPA) announced in 2009 its intent to issue rules for controlling emissions from Navajo Generating Station that could affect visibility at the Grand Canyon and at several other national parks and wilderness areas. The final rule will conform to what EPA determines is the best available retrofit technology (BART) for the control of haze-causing air pollutants, especially nitrogen oxides. While EPA is ultimately responsible for setting Navajo Generating Station's BART standards in its final rule, it will be the U.S. Department of the Interior's responsibility to manage compliance and the related impacts. This study aims to assist both Interior and EPA by providing an objective assessment of issues relating to the power sector.

  17. Properties of Douglas Point Generating Station heat transport corrosion products

    International Nuclear Information System (INIS)

    Montford, B.; Rummery, T.E.

    1975-09-01

    Chemical, radiochemical and structural properties of circulating and fixed corrosion products from the Douglas Point Generating Station are documented. Interaction of Monel-400 and carbon steel corrosion products is described, and the mechanisms of Monel-400 surface deposit release, and activity buildup in the coolant system, are briefly discussed. Efficiencies of filters and ion-exchangers for the removal of released radionuclides are given. (author)

  18. Multi-Unit Aspects of the Pickering Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Morison, W. G. [Atomic Energy of Canada Ltd, Sheridan Park, ON (Canada)

    1968-04-15

    The Pickering nuclear generating station is located on the north shore of Lake Ontario, about 20 miles east of the city of Toronto, Canada. The station has been planned and laid out on an eight-unit station, four units of which have now been authorized for construction. Each of these four units consists of a single heavy-water moderated and cooled CANDU-type reactor and auxiliaries coupled to a single tandem compound turbine generator with a net output of approximately 500 MW(e). The units are identical and are scheduled to come into operation at intervals of one year from 1970 to 1973. The station has been planned with central facilities for: administration maintenance laboratories, stores, change rooms, decontamination and waste management services. A common control centre, cooling water intake and discharge system, and spent fuel storage bay for four units has been arranged. A feature of the multi-unit station is a common containment system. Cost savings in building a number of identical units on the same site result from a single exclusion area, shared engineering costs, equipment purchase contracts for four identical components, and efficient use of construction plant. Operating cost savings are anticipated in the use of a common operating and maintenance staff and spare parts inventory. The plant has been arranged to minimize problems of operating, commissioning and constructing units at the same time on the same site. The layout and construction sequence have been arranged so that the first unit can be commissioned and operated with little or no interference from the construction forces working on succeeding units. During the construction phase barriers will be erected in the common control centre between operating control equipment and that being installed. Operations and construction personnel will enter the plant by separate routes and work in areas separated by physical barriers. (author)

  19. PA law judge recommends against Limerick-2 completion

    International Nuclear Information System (INIS)

    Minner, D.

    1985-01-01

    Ruling that Philadelphia Electric's Limerick 2 unit is not in the public interest, the court felt that a history of cost escalation makes the use of allowance for funds used during construction imprudent. Unit 1 will begin operating in 1986. Opponents to Unit 2 say that less costly power is available. The judge agreed with utility arguments that it will need additional capacity in the 1990s, but that customers must expect rate increases to pay for that power. An option to convert Unit 2 to coal has been ruled out, leaving the extension of existing plant life the preferred option

  20. Online control loop tuning in Pickering Nuclear Generating Stations

    International Nuclear Information System (INIS)

    Yu, K.X.; Harrington, S.

    2008-01-01

    Most analog controllers in the Pickering B Nuclear Generating Stations adopted PID control scheme. In replacing the analog controllers with digital controllers, the PID control strategies, including the original tuning parameters were retained. The replacement strategy resulted in minimum effort on control loop tuning. In a few cases, however, it was found during commissioning that control loop tuning was required as a result of poor control loop performance, typically due to slow response and controlled process oscillation. Several factors are accounted for the necessities of control loop re-tuning. Our experience in commissioning the digital controllers showed that online control tuning posted some challenges in nuclear power plant. (author)

  1. Probabilistic tsunami hazard assessment for Point Lepreau Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Mullin, D., E-mail: dmullin@nbpower.com [New Brunswick Power Corporation, Point Lepreau Generating Station, Point Lepreau (Canada); Alcinov, T.; Roussel, P.; Lavine, A.; Arcos, M.E.M.; Hanson, K.; Youngs, R., E-mail: trajce.alcinov@amecfw.com, E-mail: patrick.roussel@amecfw.com [AMEC Foster Wheeler Environment & Infrastructure, Dartmouth, NS (Canada)

    2015-07-01

    In 2012 the Geological Survey of Canada published a preliminary probabilistic tsunami hazard assessment in Open File 7201 that presents the most up-to-date information on all potential tsunami sources in a probabilistic framework on a national level, thus providing the underlying basis for conducting site-specific tsunami hazard assessments. However, the assessment identified a poorly constrained hazard for the Atlantic Coastline and recommended further evaluation. As a result, NB Power has embarked on performing a Probabilistic Tsunami Hazard Assessment (PTHA) for Point Lepreau Generating Station. This paper provides the methodology and progress or hazard evaluation results for Point Lepreau G.S. (author)

  2. Probabilistic seismic hazard assessment for Point Lepreau Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Mullin, D. [New Brunswick Power Corp., Point Lepreau Generating Station, Lepreau, New Brunswick (Canada); Lavine, A. [AMEC Foster Wheeler Environment and Infrastructure Americas, Oakland, California (United States); Egan, J. [SAGE Engineers, Oakland, California (United States)

    2015-09-15

    A Probabilistic Seismic Hazard Assessment (PSHA) has been performed for the Point Lepreau Generating Station (PLGS). The objective is to provide characterization of the earthquake ground shaking that will be used to evaluate seismic safety. The assessment is based on the current state of knowledge of the informed scientific and engineering community regarding earthquake hazards in the site region, and includes two primary components-a seismic source model and a ground motion model. This paper provides the methodology and results of the PLGS PSHA. The implications of the updated hazard information for site safety are discussed in a separate paper. (author)

  3. Probabilistic seismic hazard assessment for Point Lepreau Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Mullin, D., E-mail: dmullin@nbpower.com [New Brunswick Power Corporation, Point Lepreau Generating Station, Point Lepreau, NB (Canada); Lavine, A., E-mail: alexis.lavine@amecfw.com [AMEC Foster Wheeler Environment & Infrastructure Americas, Oakland, CA (United States); Egan, J., E-mail: jegan@sageengineers.com [SAGE Engineers, Oakland, CA (United States)

    2015-07-01

    A Probabilistic Seismic Hazard Assessment (PSHA) has been performed for the Point Lepreau Generating Station (PLGS). The objective is to provide characterization of the earthquake ground shaking that will be used to evaluate seismic safety. The assessment is based on the current state of knowledge of the informed scientific and engineering community regarding earthquake hazards in the site region, and includes two primary components--a seismic source model and a ground motion model. This paper provides the methodology and results of the PLGS PSHA. The implications of the updated hazard information for site safety are discussed in a separate paper. (author)

  4. Wind hazard assessment for Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Mullin, D.; Moland, M.; Sciaudone, J.C.; Twisdale, L.A.; Vickery, P.J.; Mizzen, D.R.

    2015-01-01

    In response to the CNSC Fukushima Action Plan, NB Power has embarked on a wind hazard assessment for the Point Lepreau Generating Station site that incorporates the latest up to date wind information and modeling. The objective was to provide characterization of the wind hazard from all potential sources and estimate wind-driven missile fragilities and wind pressure fragilities for various structures, systems and components that would provide input to a possible high wind Probabilistic Safety Assessment. The paper will discuss the overall methodology used to assess hazards related to tornadoes, hurricanes and straight-line winds, and site walk-down and hazard/fragility results. (author)

  5. Steam generator replacement at the Obrigheim nuclear power station

    International Nuclear Information System (INIS)

    Pickel, E.; Schenk, H.; Huemmler, A.

    1984-01-01

    The Obrigheim Nuclear Power Station (KWO) is equipped with a dual-loop pressurized water reactor of 345 MW electric power; it was built by Siemens in the period 1965 to 1968. By the end of 1983, KWO had produced some 35 billion kWh in 109,000 hours of operation. Repeated leaks in the heater tubes of the two steam generators had occurred since 1971. Both steam generators were replaced in the course of the 1983 annual revision. Kraftwerk Union AG (KWU) was commissioned to plant and carry out the replacement work. Despite the leakages the steam generators had been run safely and reliably over a period of 14 years until their replacement. Replacing the steam generators was completed within twelve weeks. In addition to the KWO staff and the supervising crew of KWU, some 400 external fitters were employed on the job at peak work-load periods. For the revision of the whole plant, work on the emergency systems and replacement of the steam generators a maximum number of approx. 900 external fitters were employed in the plant in addition to some 250 members of the plant crew. The exposure dose of the personnel sustained in the course of the steam generator replacement was 690 man-rem, which was clearly below previous estimates. (orig.) [de

  6. Designing a community engagement strategy for Limerick Smarter travel using focus groups and precedent studies

    OpenAIRE

    Cullinane, Kathleen Clair

    2012-01-01

    peer-reviewed This research aims to create a rational basis for designing and implementing a plan for Limerick Smarter Travel. This plan will pay particular attention to community engagement. This research establishes a rationale for a community engagement strategy. Precedent studies also provide direct guidance for this rationale. The objective of the plan is to develop a local culture of Smarter Travel in Limerick communities using best international practice, and thereby achieving behav...

  7. Heat exchanger tubing materials for CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Taylor, G.F.

    1977-07-01

    The performance of steam generator tubing (nickel-chromium-iron alloy in NPD and nickel-copper alloy in Douglas Point and Pickering generating stations) has been outstanding and no corrosion-induced failures have occurred. The primary coolant will be allowed to boil in the 600 MW (electrical) CANDU-PHW reactors. An iron-nickel-chromium alloy has been selected for the steam generator tubing because it will result in lower radiation fields than the alloys used before. It is also more resistant than nickel-chromium-iron alloy to stress corrosion cracking in the high purity water of the primary circuit, an unlikely but conceivable hazard associated with higher operating temperatures. Austenitic alloy and ferritic-austenitic stainless steel tubing have been selected for the moderator coolers in CANDU reactors being designed and under construction. These materials will reduce the radiation fields around the moderator circuit while retaining the good resistance to corrosion in service water that has characterized the copper-nickel alloys now in use. Brass and bronze tubes in feedwater heaters and condensers have given satisfactory service but do, however, complicate corrosion control in the steam cycle and, to reduce the transport of corrosion products from the feedtrain to the steam generator, stainless steel is preferred for feedwater heaters and stainlss steel or titanium for condensers. (author)

  8. Steam generator maintenance and life management at Embalse Nuclear Station

    International Nuclear Information System (INIS)

    Sainz, R.; Diaz, G.; Sveruga, H.; Ramakrishnan, T.K.; Azeez, S.

    2004-01-01

    The Embalse Nuclear Station has four steam generators (SGs) with inverted vertical U tubes manufactured by Babcock and Wilcox Canada (B and W). These are main components, both from the operative point of view as the heat transfer from the Primary Heat Transport System (PHTS) to the Secondary System, and from the point of view of safety, as they are the part of the PHTS and its radioactive inventory pressure barrier. In addition, they are one of the most important cost-related elements for potential life extensions. Maintenance and inspections are carried out in order to maintain a high availability of the SGs, as they have had a positive impact on the operational availability of the plant, and to reduce the tube failure probabilities, thus minimizing the amount of radioactive effluents and taking care of the condition of the main components in order to enable the plant life management and the planning of the plant life extension. The most relevant maintenance activities performed have been the inspections performed on 100% of the tubes every 3 years. the mechanical cleaning of the inside of the tubes, the sludge removal from the secondary side tubesheet, the divider plate replacement, and the inspection of internals of the secondary side.Thanks to the latter and to the eddy current inspections, the degradation in the U-bend supports was detected early and every effort is being made to repair them shortly. Besides, a life management program has been started covering the entire plant starting with this important component. The Embalse Nuclear Station's SGs show a low percentage of plugged tubes compared to other stations in similar conditions, but they must be monitored continually and systematically if a life extension is intended. (author)

  9. Public response to the Diablo Canyon Nuclear Generating Station

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-01-01

    The authors examine the nature of the public response to the Diablo Canyon Nuclear Generating Station located in San Luis Obispo, California, from the early 1960s to the present. Four distinct phases of public intervention were discerned, based on change in both plant-related issues and in the nature of the antinuclear constituencies in the region. The level of public concern varied both geographically and temporally and is related to the area's social structure, environmental predispositions, and distribution of plant-related economic benefits. External events, such as the prolonged debate over the risk assessment of the seismic hazard and the Three Mile Island accident were found to be important factors in explaining variation in public concern and political response

  10. Public response to the Diablo Canyon Nuclear Generating Station

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-01-01

    We examine the nature of the public response to the Diablo Canyon Nuclear Generating Station located in San Luis Obispo, California, from the early 1960s to the present. Four distinct phases of public intervention were discerned, based on change in both plant-related issues and in the nature of the antinuclear constituencies in the region. The level of public concern varied both geographically and temporally and is related to the area's social structure, environmental predispositions, and distribution of plant-related economic benefits. External events, such as the prolonged debate over the risk assessment of the seismic hazard and the Three Mile Island accident were found to be important factors in explaining variation in public concern and political response. (author)

  11. Public response to the Diablo Canyon Nuclear Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Pijawka, K D [Arizona State Univ., Tempe (USA)

    1982-08-01

    We examine the nature of the public response to the Diablo Canyon Nuclear Generating Station located in San Luis Obispo, California, from the early 1960s to the present. Four distinct phases of public intervention were discerned, based on change in both plant-related issues and in the nature of the antinuclear constituencies in the region. The level of public concern varied both geographically and temporally and is related to the area's social structure, environmental predispositions, and distribution of plant-related economic benefits. External events, such as the prolonged debate over the risk assessment of the seismic hazard and the Three Mile Island accident were found to be important factors in explaining variation in public concern and political response.

  12. Improving nuclear generating station response for electrical grid islanding

    International Nuclear Information System (INIS)

    Chou, Q.B.; Kundur, P.; Acchione, P.N.; Lautsch, B.

    1989-01-01

    This paper describes problems associated with the performance characteristics of nuclear generating stations which do not have their overall plant control design functions co-ordinated with the other grid controls. The paper presents some design changes to typical nuclear plant controls which result in a significant improvement in both the performance of the grid island and the chances of the nuclear units staying on-line following the disturbance. This paper focuses on four areas of the overall unit controls and turbine governor controls which could be modified to better co-ordinate the control functions of the nuclear units with the electrical grid. Some simulation results are presented to show the performance of a typical electrical grid island containing a nuclear unit with and without the changes

  13. St. Paul's Nursing Home, Dooradoyle, Limerick.

    LENUS (Irish Health Repository)

    Dakna, Mohammed

    2010-12-10

    Abstract Background The purpose of this manuscript is to provide, based on an extensive analysis of a proteomic data set, suggestions for proper statistical analysis for the discovery of sets of clinically relevant biomarkers. As tractable example we define the measurable proteomic differences between apparently healthy adult males and females. We choose urine as body-fluid of interest and CE-MS, a thoroughly validated platform technology, allowing for routine analysis of a large number of samples. The second urine of the morning was collected from apparently healthy male and female volunteers (aged 21-40) in the course of the routine medical check-up before recruitment at the Hannover Medical School. Results We found that the Wilcoxon-test is best suited for the definition of potential biomarkers. Adjustment for multiple testing is necessary. Sample size estimation can be performed based on a small number of observations via resampling from pilot data. Machine learning algorithms appear ideally suited to generate classifiers. Assessment of any results in an independent test-set is essential. Conclusions Valid proteomic biomarkers for diagnosis and prognosis only can be defined by applying proper statistical data mining procedures. In particular, a justification of the sample size should be part of the study design.

  14. St. Gobnait's Nursing Home, Drewscourt, Ballyagran, Limerick.

    LENUS (Irish Health Repository)

    Kamel Boulos, Maged N

    2011-12-21

    Abstract \\'Wikification of GIS by the masses\\' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild\\'s term \\'Volunteered Geographic Information\\'. Six years later (2005-2011), OpenStreetMap and Google Earth (GE) are now full-fledged, crowdsourced \\'Wikipedias of the Earth\\' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional) models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and \\'human-in-the-loop sensing\\' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis\\/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, "noise", misinformation, bias and trust), the core technologies and Open Geospatial Consortium (OGC) standards involved (Sensor Web Enablement and Open GeoSMS), as well as a few outstanding project implementation examples from around the world.

  15. A 1500-MW(e) HTGR nuclear generating station

    International Nuclear Information System (INIS)

    Stinson, R.C.; Hornbuckle, J.D.; Wilson, W.H.

    1976-01-01

    A conceptual design of a 1500-MW(e) HTGR nuclear generating station is described. The design concept was developed under a three-party arrangement among General Atomic Company as nuclear steam supply system (NSSS) supplier, Bechtel Power Corporation as engineer-constructors of the balance of plant (BOP), and Southern California Edison Company as a potential utility user. A typical site in the lower Mojave Desert in southeastern California was assumed for the purpose of establishing the basic site criteria. Various alternative steam cycles, prestressed concrete reactor vessel (PCRV) and component arrangements, fuel-handling concepts, and BOP layouts were developed and investigated in a programme designed to lead to an economic plant design. The paper describes the NSSS and BOP designs, the general plant arrangement and a description of the site and its unique characteristics. The elements of the design are: the use of four steam generators that are twice the capacity of GA's steam generators for its 770-MW(e) and 1100-MW(e) units; the rearrangement of steam and feedwater piping and support within the PCRV; the elimination of the PCRV star foundation to reduce the overall height of the containment building as well as of the PCRV; a revised fuel-handling concept which permits the use of a simplified, grade-level fuel storage pool; a plant arrangement that permits a substantial reduction in the penetration structure around the containment while still minimizing the lengths of cable and piping runs; and the use of two tandem-compound turbine generators. Plant design bases are discussed, and events leading to the changes in concept from the reference 8-loop PCRV 1500-MW(e) HTGR unit are described. (author)

  16. Cordova Lake dam hydroelectric generating station case study

    International Nuclear Information System (INIS)

    Kerr, D.; Huxley, J.

    1993-01-01

    The Ontario Ministry of Natural Resources released a Crown owned site to the private water power industry as part of the small hydro site release program initiated by the Ontario Government in the mid 1980's. The Cordova Lake Dam Hydroelectric Generating Station, built on this site, has been in operation since the first week of October, 1992. Since that time, the plant has been operating with less than 1 % down time and has generated over 2,400 MWh of electricity. Algonquin Power Systems is responsible for the management and operations of the plant which includes full time monitoring from the company's Mississauga office and a part time employee at Cordova Lake. Cordova Lake Dam is located on the Crowe River at the outlet of Cordova Lake, approximately 125 kilometers east of Toronto, Ontario. The total cost of the Cordova Lake Dam project was $1.6 million. Algonquin Power contributed 20% equity to the project. Algonquin Power was also responsible for all engineering and geotechnical work and for completing the construction and equipment contracts. 1 tab., 2 figs

  17. Safety design of next generation SUI of CANDU stations

    International Nuclear Information System (INIS)

    Nasimi, Elnara; Gabbar, Hossam A.

    2013-01-01

    Highlights: ► Review of current SUI technologies and challenges. ► Propose a new type of SUI detectors. ► Propose a new SUI system architecture and layout. ► Propose implementation procedure for SUI with reduced risks. - Abstract: Due to the age and operating experience of Nuclear Power Plants, equipment ageing and obsolescence has become one of the main challenges that need to be resolved for all systems, structures and components in order to ensure a safe and reliable production of energy. This paper summarizes the research into a methodology for modernization of Start-Up Instrumentation (SUI), both in-core and Control Room equipment, using a new generation of detectors and cables in order to manage obsolescence. The main objective of this research is to develop a new systematic approach to SUI installation/replacement procedure development and optimization. Although some additional features, such as real-time data monitoring and storage/archiving solutions for SUI systems are also examined to take full advantage of today's digital technology, the objectives of this study do not include detailed parametrical studies of detector or system performance. Instead, a number of technological, operational and maintenance issues associated with Start-Up Instrumentation systems at Nuclear Power Plants (NPPs) will be identified and a structured approach for developing a replacement/installation procedure that can be standardized and used across all of the domestic CANDU (Canadian Deuterium Uranium) stations is proposed.

  18. Development situation about the Canadian CANDU Nuclear Power Generating Stations

    Energy Technology Data Exchange (ETDEWEB)

    Jeon, Yu Mi; Kim, Yong Hee; Park, Joo Hwan

    2009-07-15

    The CANDU reactor is the most versatile commercial power reactor in the world. The acronym 'CANDU', a registered trademark of Atomic Energy of Canada Limited, stands for 'CANada Deuterium Uranium'. CANDU uses heavy water as moderator and uranium (originally, natural uranium) as fuel. All current power reactors in Canada are of the CANDU type. Canada exports CANDU type reactor in abroad. CANDU type is used as the nuclear power plants to produce electrical. Today, there are 41 CANDU reactors in use around the world, and the design has continuously evolved to maintain into unique technology and performance. The CANDU-6 power reactor offers a combination of proven, superior and state-of-the-art technology. CANDU-6 was designed specifically for electricity production, unlike other major reactor types. One of its characteristics is a very high operating and fuel efficiency. Canada Nuclear Power Generating Stations were succeeded in a commercial reactor of which the successful application of heavy water reactor, natural uranium method and that on-power fuelling could be achieved. It was achieved through the joint development of a major project by strong support of the federal government, public utilities and private enterprises. The potential for customization to any country's needs, with competitive development and within any level of domestic industrial infrastructure, gives CANDU technology strategic importance in the 21st century.

  19. Mattagami River Lake sturgeon entrainment : Little Long generating station facilities

    International Nuclear Information System (INIS)

    Seyler, J.; Evers, J.; McKinley, S.; Evans, R.R.; Prevost, G.; Carson, R.; Phoenix, D.

    1996-01-01

    This project and publication is the result of a collaborative effort by other Large River Ecosystem Unit of Northeast Science (NEST), Ontario Hydro in Kapuskasing, and the New Post First Nation in Cochrane, Ontario, designed to investigate potential solutions to minimize or eliminate the problem of trapped lake sturgeon in the Adam Creek Diversion. The Adam Creek Dam is used to divert excess water from the Mattagami River hydroelectric complex which consists of the Little Long, Smoky Falls, Harmon and Kipling generating stations. The lake sturgeon entrainment problem in the area was discovered in 1990. Potential solutions to the problem include the redirection of flows to mainstream, the placement of a rope barrier, electrical deterrents, physical/electrical guidance systems, sound deterrents, gate modifications, and the continued relocation of fish. The advantages and disadvantages of each of these potential solutions are discussed. Results of the analysis indicated that perceptual and physical barriers have the greatest potential to minimize lake sturgeon entrainment in Adam Creek. 25 refs., 2 tabs., 3 figs., 6 appendices

  20. Development situation about the Canadian CANDU Nuclear Power Generating Stations

    International Nuclear Information System (INIS)

    Jeon, Yu Mi; Kim, Yong Hee; Park, Joo Hwan

    2009-07-01

    The CANDU reactor is the most versatile commercial power reactor in the world. The acronym 'CANDU', a registered trademark of Atomic Energy of Canada Limited, stands for 'CANada Deuterium Uranium'. CANDU uses heavy water as moderator and uranium (originally, natural uranium) as fuel. All current power reactors in Canada are of the CANDU type. Canada exports CANDU type reactor in abroad. CANDU type is used as the nuclear power plants to produce electrical. Today, there are 41 CANDU reactors in use around the world, and the design has continuously evolved to maintain into unique technology and performance. The CANDU-6 power reactor offers a combination of proven, superior and state-of-the-art technology. CANDU-6 was designed specifically for electricity production, unlike other major reactor types. One of its characteristics is a very high operating and fuel efficiency. Canada Nuclear Power Generating Stations were succeeded in a commercial reactor of which the successful application of heavy water reactor, natural uranium method and that on-power fuelling could be achieved. It was achieved through the joint development of a major project by strong support of the federal government, public utilities and private enterprises. The potential for customization to any country's needs, with competitive development and within any level of domestic industrial infrastructure, gives CANDU technology strategic importance in the 21st century

  1. Environmental emissions control programs at Lambton TGS [Thermal Generating Station

    International Nuclear Information System (INIS)

    Kalvins, A.K.

    1992-01-01

    Ontario Hydro's air emissions control programs at Lambton thermal generating station, both committed and planned, are reviewed, and their potential impacts on emissions, effluents and wastes are discussed. Control technologies examined include flue gas conditioning, wet limestone scrubbing, combustion process modifications, urea injection, and selective catalytic reduction. The implementation of these technologies has the potential to create new solid and liquid waste disposal problems, the full extent of which is often not realized at the process selection stage. For example, selective noncatalytic reduction using urea injection can lead to increased CO emissions, escape of unreacted ammonia from the stack at levels of 5-50 ppM, increase in N 2 O emissions, contamination of fly ash, gypsum and waste water with ammonia, and an increase in CO 2 emissions of less than 0.4% due to increased power consumption. Optimum performance of the air emissions control systems, with minimum negative impact on the environment, requires consideration of the impact of these systems on all waste streams. 11 refs., 3 figs., 1 tab

  2. Chemistry control experiences at Kaiga Generating Station (KGS), NPCIL

    International Nuclear Information System (INIS)

    Harikrishna, K.; Somasundaram, K.M.; Sanathkumar, V.V.; Nageswara Rao, G.

    2006-01-01

    The Chemistry control section at Kaiga Generating Station (KGS), NPCIL had keenly pursued many developmental works and projects which had not only improved the system performance and reliability but also largely benefited the Station by many ways. The highlights of some of the major developmental works that have contributed significantly are: 1. Studies on frequent and sharp rise in dew point values of AGMS: In the Annulus Gas Monitoring Systems (AGMS) of KGS units, it was observed that the system dew points were rising very sharply and abruptly. The systematic studies revealed the presence of Hydrogen impurity in CO 2 gas cylinders, hence emphasized the need to ensure the gaseous contents before injecting the media from the cylinders to the system. 2. a. Studies on frequent tube failures of TG auxiliary coolers: The detailed studies and investigation revealed that under deposit corrosion contributed by microbiological attack was the main cause for frequent failures of 90/10 Cupro Nickel cooler tubes which could be minimized either by resorting to periodical mechanical/chemical cleaning of cooler tubes or by regular chemical treatment with a suitable chemical formulation. b. Development of suitable chemical formulation for chemical cleaning of TG auxiliary coolers: A series of in-house experiments at site resulted in developing a suitable chemical formulation for effective cleaning of 90/10 Cupro Nickel cooler tubes. The formulation with 1 % w/w Citric acid with pH adjusted to 8.0 by Ammonia in first step followed by 1 % w/w EDTA with pH adjusted to 9.0 by Hydrazine in the second step could yield more than 90 % cleanliness. 3. Chemical cleaning of cooling circuits of AHUs: An in-house formulation was developed and used for chemical cleaning of cooling circuits (with copper tubes) of AHUs. Post chemical cleaning, the room temperatures decreased by 3-4 degC, hence resulted in better cooling. 4. Enhancement in service period of BBD IX columns: The service period of

  3. Aerial radiological survey of the Rancho Seco Nuclear Generating Station, Clay Station, California, 18 January 1980 to 1 February 1980

    International Nuclear Information System (INIS)

    1980-11-01

    An airborne radiological survey of 260 km 2 area centered over the Rancho Seco Nuclear Generating Station was made 18 January through 1 February 1980. Detected radioisotopes and their associated gamma ray exposure rates were consistent with that expected from normal background emitters, except directly over the station. Count rates observed at 90 m altitude were converted to exposure rates at 1 m above the ground and are presented in the form of an isopleth map

  4. Chemistry technician performance evaluation program Palo Verde Nuclear Generating Station

    International Nuclear Information System (INIS)

    Shawver, J.M.

    1992-01-01

    The Arizona Nuclear Power Project (ANPP), a three-reactor site located 50 miles west of Phoenix, Arizona, has developed and implemented a program for evaluating individual chemistry technician analytical performance on a routine basis. About 45 chemistry technicians are employed at the site, 15 at each operating unit. The technicians routinely perform trace level analyses for impurities of concern to PWRs. Each month a set of blind samples is provided by an outside vendor. The blind samples contain 16 parameters which are matrixed to approximate the PWR's primary and secondary cycles. Nine technicians receive the samples, three from each operating unit, and perform the required analyses. Acceptance criteria for successful performance on the blind parameters is based on the values found in the Institute of Nuclear Power Operations (INPO) Document 83-016, Revision 2, August 1989, Chemistry Quality Control Program. The goal of the program is to have each technician demonstrate acceptable performance on each of 16 analytical parameters. On completion of each monthly set, a summary report of all of the analytical results for the sample set is prepared. From the summary report, analytical bias can be detected, technician performance is documented, and overall laboratory performance can be evaluated. The program has been very successful at satisfying the INPO requirement that the analytical performance of each individual technician should be checked on at least a six-month frequency for all important parameters measured. This paper describes the program as implemented at the Palo Verde Nuclear Generating Station and provides a summary report and trend and bias graphs for illustrative purposes

  5. Analysis of steam generator tube sections removed from Gentilly-2 nuclear generating station

    International Nuclear Information System (INIS)

    Semmler, J.; Lockley, A.J.; Doyon, D.

    2010-01-01

    deposition rate in the steam generators from 2001 to 2009 were estimated and compared to the estimated values from 1983 (station commissioning) to 2001. This paper presents a summary of steam generator tube characterization results and describes how the data on the oxide deposition rate were correlated to the changes in station operating practices. These data demonstrate the benefits that resulted from recent changes to station chemistry and operational practices. (author)

  6. 33 CFR 165.554 - Security Zone; Three Mile Island Generating Station, Susquehanna River, Dauphin County...

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Security Zone; Three Mile Island... Areas Fifth Coast Guard District § 165.554 Security Zone; Three Mile Island Generating Station... waters of the Susquehanna River in the vicinity of the Three Mile Island Generating Station bounded by a...

  7. 75 FR 52045 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Unit 3; Environmental...

    Science.gov (United States)

    2010-08-24

    ... Company, Palo Verde Nuclear Generating Station, Unit 3; Environmental Assessment and Finding of No.... NPF-74, issued to Arizona Public Service Company (APS, the licensee), for operation of Palo Verde... Statement for the Palo Verde Nuclear Generating Station, NUREG-0841, dated February 1982. Agencies and...

  8. 76 FR 1197 - Arizona Public Service Company, Palo Verde Nuclear Generating Station; Notice of Availability of...

    Science.gov (United States)

    2011-01-07

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-528, 50-529, 50-530; NRC-2009-0012] Arizona Public Service Company, Palo Verde Nuclear Generating Station; Notice of Availability of the Final Supplement 43... of operation for the Palo Verde Nuclear Generating Station (PVNGS). Possible alternatives to the...

  9. Monitoring and managing component fatigue at Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Stevens, G.L.; Yetisir, M.; Scovil, A.; Slade, J.

    2008-01-01

    Many CANDU plants are now approaching the end of their design lives and are being considered for extended operation beyond their design life. The Canadian Nuclear Safety Commission (CNSC) has asked utilities to address component fatigue issues in plant life extension (PLEX) applications. In particular, environmental effects on fatigue was identified as an issue that needs to be addressed, similar to being addressed for license renewal for U.S. nuclear power plants. To address CNSC concerns, the CANDU Owners Group (COG) has initiated a program to help utilities develop component fatigue management programs for PLEX operation. A summary of a pilot study that was conducted at the Point Lepreau Generating Station (PLGS) is provided below: A plant-specific Recommendation Study provided a comprehensive review of the existing plant-specific systems, cycle counting procedures, and other fatigue-related requirements, and made some general recommendations on how best to implement a fatigue management system for PLEX. The plant-specific study determined that only 10 to 15% of the design transients have been used after 25 effective full power years (EFPY) of operation. Hence, a significant amount of original design margin for fatigue usage margin remains available for PLEX operation. Environmental fatigue considerations in heavy water (D 2 O) were included in the plant-specific assessment. Only warm-up transients were assessed to have dissolved oxygen concentrations that can result in a significant environmental effect for the ferritic steels used in the CANDU primary systems. Due to the low accumulation of transients and the absence of known thermal stratification mechanisms, thermal fatigue is not as significant an issue in CANDU plants as in pressurized water reactor (PWR) and boiling water reactor (BWR) plants. The needs for implementing a comprehensive Fatigue Management Program for PLGS to satisfy PLEX requirements were defined, and specific direction and strategy for

  10. Nuclear generating station and heavy water plant cost estimates for strategy studies

    International Nuclear Information System (INIS)

    Archinoff, G.H.

    1979-07-01

    Nuclear generating station capital, operating and maintenance costs are basic input data for strategy analyses of alternate nuclear fuel cycles. This report presents estimates of these costs for natural uranium CANDU stations, CANDU stations operating on advanced fuel cycles, and liquid metal fast breeder reactors. Cost estimates for heavy water plants are also presented. The results show that station capital costs for advanced fuel cycles are not expected to be significantly greater than those for natural uranium stations. LMFBR capital costs are expected to be 25-30 percent greater than for CANDU's. (auth)

  11. Utilization of waste heat from electricity generating stations

    International Nuclear Information System (INIS)

    Robertson, R.F.S.

    1977-06-01

    Historically the nuclear power station has been designed solely as an electricity producer. But in Canada today only 15 percent of our energy consumption is as electricity. The non-electrical needs today are supplied almost entirely by natural gas and oil. There is an incentive to see whether a nuclear station could supply energy for some of these non-electrical needs, thus freeing gas and oil for uses for which they may be more valuable and suitable, especially in transportation. A group located at the Whiteshell Nuclear Research Establishment undertook a series of studies to examine this problem. These studies were done in sufficient depth to provide technological and economic answers, and as a result several reports have been published on various topics. In this report, the findings from these studies are drawn together in an assessment of the potential in Canada for using waste heat. (author)

  12. Radio-location of mobile stations in third generation networks

    Directory of Open Access Journals (Sweden)

    Milan Manojle Šunjevarić

    2013-06-01

    Full Text Available Mobile station localization in mobile networks started with simple methods (e.g. Cell-ID method which required only slight modifications of network infrastructures. Principally, it was about network localization by which a localization service became available to all types of mobile phones. Due to low precision, the initiated development of more sophisticated methods has not been finished yet. Among the advanced location-based methods are those based on the measurement of location parameters in the time domain. In this paper the general consideration of radio location methods in 3G (UMTS radio networks is presented. The use of time based measurement methods was analysed in detail. Due to the limited article length, the use of other locating methods in 3G networks (based on power measurements, on radio direction measurement, and on cells identification – Cell ID and global positioning system - GPS are not described. Introduction Mobile station localization within modern cellular networks increases the level of user security and opens wide opportunities for commercial operators who provide this service. The major obstacle for the implementation of this service, which also prevents its practical usage, is the modification of the existing network infrastructure. In general, depending on the infrastructure used, positioning methods can be divided into two groups: integrated and independent. Integrated methods are primarily created for communication networks. A possibility to locate users represents just an additional service within a radio network. Independent methods are totally detached from the communication network in which the user whose location is being determined is. Radio location methods Determining the location of a mobile radio station is performed by determining the intersection of two or more lines of position. These lines represent the position of the set of points at which the mobile station may be located. These lines can be: (a

  13. Inspiring the Next Generation: The International Space Station Education Accomplishments

    Science.gov (United States)

    Alleyne, Camille W.; Hasbrook, Pete; Knowles, Carolyn; Chicoine, Ruth Ann; Miyagawa, Yayoi; Koyama, Masato; Savage, Nigel; Zell, Martin; Biryukova, Nataliya; Pinchuk, Vladimir; hide

    2014-01-01

    The International Space Station (ISS) has a unique ability to capture the imagination of both students and teachers worldwide. Since 2000, the presence of humans onboard ISS has provided a foundation for numerous educational activities aimed at capturing that interest and motivating study in the sciences, technology, engineering and mathematics (STEM). Over 43 million students around the world have participated in ISS-related educational activities. Projects such as YouTube Space Lab, Sally Ride Earth Knowledge-based Acquired by Middle Schools (EarthKAM), SPHERES (Synchronized Position Hold Engage and Reorient Experimental Satellites) Zero-Robotics, Tomatosphere, and MAI-75 events among others have allowed for global student, teacher and public access to space through student classroom investigations and real-time audio and video contacts with crewmembers. Educational activities are not limited to STEM but encompass all aspects of the human condition. This is well illustrated in the Uchu Renshi project, a chain poem initiated by an astronaut while in space and continued and completed by people on Earth. With ISS operations now extended to 2024, projects like these and their accompanying educational materials are available to more students around the world. From very early on in the program's history, students have been provided with a unique opportunity to get involved and participate in science and engineering projects. Many of these projects support inquiry-based learning that allows students to ask questions, develop hypothesis-derived experiments, obtain supporting evidence and identify solutions or explanations. This approach to learning is well-published as one of the most effective ways to inspire students to pursue careers in scientific and technology fields. Ever since the first space station element was launched, a wide range of student experiments and educational activities have been performed, both individually and collaboratively, by all the

  14. Socio-economic impacts of nuclear generating stations

    International Nuclear Information System (INIS)

    Weisiger, M.L.; Pijawka, K.D.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the St. Lucie nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  15. Socio-economic impacts of nuclear generating stations: Arkansas Nuclear One Station case study

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Arkansas Nuclear One nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  16. Diagnostic testing and repair of Hollingsworth Generating Station`s Unit One

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    This paper presents a case history of the diagnosis of a hydroelectric generator problem and the corrections implemented. The problem involved an excessive rotor imbalance coupled with a static air gap imbalance that cause severe load-sensitive vibrations. The problem constrained the plant from operating the generator unit throughout the range of its nameplate rating and caused periodic failure of the generator guide and thrust bearing. The paper describes the vibration survey and mechanical survey of the generator rotor, the pre-overhaul diagnosis, the repairs undertaken to the rotor, and the generator performance after the repair, with comparison to the pre-repair condition. The paper concludes with a discussion of the economic, operational, and logistic issues involved in the overhaul.

  17. Simulation of the energy - environment economic system power generation costs in power-stations

    International Nuclear Information System (INIS)

    Weible, H.

    1978-09-01

    The costs of power generation are an important point in the electricity industry. The present report tries to supply a model representation for these problems. The costs of power generation for base load, average and peak load power stations are examined on the basis of fossil energy sources, nuclear power and water power. The methods of calculation where dynamic investment calculation processes are used, are given in the shape of formulae. From the point of view of long term prediction, power generation cost sensitivity studies are added to the technical, economic and energy-political uncertainties. The sensitivity of models for calculations is examined by deterministic and stochastic processes. In the base load and average region, power generation based on nuclear power and water power is economically more favourable than that from fossilfired power stations. Even including subsidies, this cost advantage is not in doubt. In the peak load region, pumped storage power stations are more economic than fossilfired power stations. (orig.) [de

  18. Three Mile Island Nuclear Station steam generator chemical cleaning

    International Nuclear Information System (INIS)

    Hansen, C.A.

    1992-01-01

    The Three Mile Island-1 steam generators were chemically cleaned in 1991 by the B and W Nuclear Service Co. (BWNS). This secondary side cleaning was accomplished through application of the EPRI/SGOG (Electric Power Research Institute - Steam Generator Owners Group) chemical cleaning iron removal process, followed by sludge lancing. BWNS also performed on-line corrosion monitoring. Corrosion of key steam generator materials was low, and well within established limits. Liquid waste, subsequently processed by BWNS was less than expected. 7 tabs

  19. Reliable, fault tolerant control systems for nuclear generating stations

    International Nuclear Information System (INIS)

    McNeil, T.O.; Olmstead, R.A.; Schafer, S.

    1990-01-01

    Two operational features of CANDU Nuclear Power Stations provide for high plant availability. First, the plant re-fuels on-line, thereby eliminating the need for periodic and lengthy refuelling 'outages'. Second, the all plants are controlled by real-time computer systems. Later plants are also protected using real-time computer systems. In the past twenty years, the control systems now operating in 21 plants have achieved an availability of 99.8%, making significant contributions to high CANDU plant capacity factors. This paper describes some of the features that ensure the high degree of system fault tolerance and hence high plant availability. The emphasis will be placed on the fault tolerant features of the computer systems included in the latest reactor design - the CANDU 3 (450MWe). (author)

  20. Determination of reliability criteria for standby diesel generators at a nuclear power station

    International Nuclear Information System (INIS)

    Evans, M.G.K.

    1987-01-01

    The requirement for standby diesel generators at nuclear power stations is developed and a probabilistic approach used to define the reliability parameters. The present criteria used when ordering a diesel generator are compared with the testing required by the regulatory body and the most likely requirement following an accident. The impact of this on the diesels at a particular station and the root cause of failures are discussed. (orig.)

  1. US central station nuclear electric generating units: significant milestones

    International Nuclear Information System (INIS)

    1979-09-01

    Listings of US nuclear power plants include significant dates, reactor type, owners, and net generating capacity. Listings are made by state, region, and utility. Tabulations of status, schedules, and orders are also presented

  2. Diagnostic testing and repair of Hollingsworth Generating Station`s Unit One

    Energy Technology Data Exchange (ETDEWEB)

    Atkins, R.; Epple, W.; Stevenson, D. [Great Lakes Power Ltd., Sault Ste. Marie, ON (Canada); Brotherton, L.; Crahan, M.; Ghate, A.

    1995-12-31

    A case history of the diagnosis and corrections implemented to resolve vibration problems in a 22,222 kVA hydroelectric generator was presented. The problem prevented the utility from operating the unit throughout the range of its nameplate rating and caused periodic failures of the generator`s guide and thrust bearing. Tests identified that the rim assembly was fastened onto the spider in a manner that resulted in tilting of the rim with respect to the axis of rotation, consequently, there was an unbalanced generator static air gap. A unique repair was implemented to fully restore the rim assembly to its proper position. Problems associated with carrying out such major in-situ repairs in a remote environment and within a scheduled maintenance outage were discussed. Economic benefits and costs associated with the repair were also discussed.

  3. Phytotoxicology section investigation in the vicinity of the Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the Darlington Nuclear Generating Station, in October, 1989

    International Nuclear Information System (INIS)

    1991-02-01

    The Phytotoxicology Section, Air Resources Branch is a participant in the Pickering and Bruce Nuclear Contingency Plans. The Phytotoxicology Emergency Response Team is responsible for collecting vegetation samples in the event of a nuclear emergency at any of the nuclear generating stations in the province. As part of its responsibility the Phytotoxicology Section collects samples around the nuclear generating stations for comparison purposes in the event of an emergency. Because of the limited frequency of sampling, the data from the surveys are not intended to be used as part of a regulatory monitoring program. These data represent an effort by the MOE to begin to establish a data base of tritium concentrations in vegetation. The Phytotoxicology Section has carried out seven surveys in the vicinity of Ontario Hydro nuclear generating stations since 1981. Surveys were conducted for tritium in snow in the vicinity of Bruce Nuclear Power Development (BNPD), February, 1981; tritium in cell-free water of white ash in the vicinity of BNPD, September, 1981; tritium in snow in the vicinity of BNPD, March, 1982; tritium in tree sap in the vicinity of BNPD, April, 1982; tritium in tree sap in the vicinity of BNPD, April, 1984, tritium in the cell-free water of white ash in the vicinity of BNPD, September, 1985; and, tritium in cell-free water of grass in the vicinity of Pickering Nuclear Generation Station (PNGS), October 1986. In all cases a pattern of decreasing tritium levels with increasing distance from the stations was observed. In October, 1989, assessment surveys were conducted around Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the new Darlington Nuclear Generating Station (DNGS). The purpose of these surveys was to provide baseline data for tritium in cell-free water of grass at all three locations at the same time of year. As none of the reactor units at DNGS had been brought on line at the time of the survey, this data was to be

  4. 76 FR 24064 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice...

    Science.gov (United States)

    2011-04-29

    ... Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice of Issuance of Renewed... Company (licensee), the operator of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (PVNGS... Plants: Supplement 43, Regarding Palo Verde Nuclear Generating Station,'' issued January 2011, discusses...

  5. Foreign Material Exclusion Program at CNE Cernavoda Nuclear Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Urjan, Daniel [S.N. ' Nuclearelectrica' SA, CNE Cernavoda Nuclear Power Plant, Medgidiei 2 Street, 905200 Cernavoda, Constanta (Romania)

    2008-07-01

    In the face of a continuing attention to operations and maintenance costs at nuclear power plants, the future of the industry depends largely upon increasing plant availability and improving operating efficiency. The success in achieving these objectives is dependent upon the success of each plant's equipment maintenance program. Preventing the introduction of foreign materials into a nuclear power plant system or component requires a careful, thoughtful, and professional approach by all site personnel. This paper describes a proactive approach to prevent the introduction of foreign material into systems and components, by providing an overview of technical considerations required to develop, implement, and manage a foreign material exclusion program at CNE Cernavoda Unit 1 and 2 Nuclear Power Station. It is also described an example of Foreign Material Intrusion which happened during the 2003 planned maintenance outage at Cernavoda Unit no.1. This paper also defines personnel responsibilities and key nomenclature and a means for evaluating prospective work tasks and activities against standardized criteria, in order to identify the appropriate level of the required FME controls. (author)

  6. Foreign Material Exclusion Program at CNE Cernavoda Nuclear Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Urjan, Daniel [S.N. ' Nuclearelectrica' SA, CNE Cernavoda Nuclear Power Plant, Medgidiei 2 Street, 905200 Cernavoda, Constanta (Romania)

    2008-07-01

    In the face of a continuing attention to operations and maintenance costs at nuclear power plants, the future of the industry depends largely upon increasing plant availability and improving operating efficiency. The success in achieving these objectives is dependent upon the success of each plant's equipment maintenance program. Preventing the introduction of foreign materials into a nuclear power plant system or component requires a careful, thoughtful, and professional approach by all site personnel. This paper describes a proactive approach to prevent the introduction of foreign material into systems and components, by providing an overview of technical considerations required to develop, implement, and manage a foreign material exclusion program at CNE Cernavoda Unit 1 and 2 Nuclear Power Station. It is also described an example of Foreign Material Intrusion which happened during the 2003 planned maintenance outage at Cernavoda Unit no.1. This paper also defines personnel responsibilities and key nomenclature and a means for evaluating prospective work tasks and activities against standardized criteria, in order to identify the appropriate level of the required FME controls. (author)

  7. Foreign Material Exclusion Program at CNE Cernavoda Nuclear Generating Station

    International Nuclear Information System (INIS)

    Urjan, Daniel

    2008-01-01

    In the face of a continuing attention to operations and maintenance costs at nuclear power plants, the future of the industry depends largely upon increasing plant availability and improving operating efficiency. The success in achieving these objectives is dependent upon the success of each plant's equipment maintenance program. Preventing the introduction of foreign materials into a nuclear power plant system or component requires a careful, thoughtful, and professional approach by all site personnel. This paper describes a proactive approach to prevent the introduction of foreign material into systems and components, by providing an overview of technical considerations required to develop, implement, and manage a foreign material exclusion program at CNE Cernavoda Unit 1 and 2 Nuclear Power Station. It is also described an example of Foreign Material Intrusion which happened during the 2003 planned maintenance outage at Cernavoda Unit no.1. This paper also defines personnel responsibilities and key nomenclature and a means for evaluating prospective work tasks and activities against standardized criteria, in order to identify the appropriate level of the required FME controls. (author)

  8. Conceptual design of a DOT farm generator station

    NARCIS (Netherlands)

    Michailidis, D.; Diepeveen, N.F.B.

    2011-01-01

    The Delft Offshore Turbine (DOT) is a DUWIND research project that focuses on reducing the cost of offshore wind energy by bringing a radical change in offshore wind turbine technology. The main concept is to centralize electricity generation by having individual wind turbines create a flow of

  9. Main feedwater valve diagnostics at Waterford 3 nuclear generating station

    International Nuclear Information System (INIS)

    Fitzgerald, W.V.

    1991-01-01

    Pneumatically-operated control valves are coming under increasing scrutiny in nuclear power plants because of their relatively high incident rate. The theory behind a device that could make performance evaluation of these valves simpler and more effective was first described at the original EPRI Power Plant Valve Symposium. The development of this Diagnostic System was completed in 1989, and it was recently used to troubleshoot two main feedwater valves at Louisiana Power and Light's Waterford 3 Power Station. During a cold snap last December, these valves failed to respond to the input signal and, as a result, the plant came off line. An incident report had to be filed, and the plant chose to contact the original equipment manufacturer (OEM) for assistance. This paper describes the original incident involving these valves and then gives a brief description of the diagnostic system and how it works. The balance of the paper then reviews how the OEM and plant personnel utilized the system to evaluate each component of the control valve assembly (I/P transducer, positioner, volume boosters, actuator, and valve body assembly). By simply stroking the valve and monitoring pneumatic signals and valve position, the problem was traced to a malfunctioning positioner and a volume booster that was leaking. The problems were corrected and new performance signatures run for the valves using the system to document their improved operation. This case study demonstrates how new Diagnostic Technology along with OEM involvement can effectively address problems with pneumatically-operated control valves so that root-cause solutions can be implemented

  10. Technical descriptions of Hudson River electricity generating stations

    International Nuclear Information System (INIS)

    Hutchison, J.B.

    1988-01-01

    Six fossil-fueled and one nuclear electricity generating plants are sited along the Hudson River estuary between kilometers 8 and 228, measured from the river mouth. Their aggregate rated capacity is 5,798 MW of electricity; operating at that capacity they would withdraw cooling water from the river at the rate of 1.5 x 10 to the 9th power cu m/d and reject heat at the rate of 155 x 10 to the 9th power kcal/d. Three of these plants, the fossil-fueled Roseton and Bowline and the nuclear Indian Point facilities; account for 75% of total rated capacity, 62% of maximum water withdrawal, and 79% of potential heat rejection. These three plants and a proposed pumped-storage facility at Cornwall, all sited between km 60 and 106, were the focus of environmental litigation. The Indian Point plant normally operates at 100% generation capacity; the other plants may experience daily operating load changes that vary from approximately 50% to 100% of total generation capacity, depending on system electrical demand or economic considerations. All plants experience periodic unscheduled outages for repairs. 6 refs., 7 figs

  11. Thermal efficiency improvements - an imperative for nuclear generating stations

    International Nuclear Information System (INIS)

    Hassanien, S.; Rouse, S.

    1997-01-01

    A one and a half percent thermal performance improvement of Ontario Hydro's operating nuclear units (Bruce B, Pickering B, and Darlington) means almost 980 GWh are available to the transmission system (assuming an 80% capacity factor). This is equivalent to the energy consumption of 34,000 electrically-heated homes in Ontario, and worth more than $39 million in revenue to Ontario Hydro Nuclear Generation. Improving nuclear plant thermal efficiency improves profitability (more GWh per unit of fuel) and competitiveness (cost of unit energy), and reduces environmental impact (less spent fuel and nuclear waste). Thermal performance will naturally decrease due to the age of the units unless corrective action is taken. Most Ontario Hydro nuclear units are ten to twenty years old. Some common causes for loss of thermal efficiency are: fouling and tube plugging of steam generators, condensers, and heat exchangers; steam leaks in the condenser due to valve wear, steam trap and drain leaks; deposition, pitting, cracking, corrosion, etc., of turbine blades; inadequate feedwater metering resulting from corrosion and deposition. This paper stresses the importance of improving the nuclear units' thermal efficiency. Ontario Hydro Nuclear has demonstrated energy savings results are achievable and affordable. Between 1994 and 1996, Nuclear reduced its energy use and improved thermal efficiency by over 430,000 MWh. Efficiency improvement is not automatic - strategies are needed to be effective. This paper suggests practical strategies to systematically improve thermal efficiency. (author)

  12. AECB staff annual assessment of the Darlington Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of safety at the Darlington Nuclear Generating Station for 1996. Ontario Hydro operated the station in a safe manner in 1996. All four special safety systems were fully available 100 percent of the time. There were more problems that affected the safety support systems in 1996 than in the previous year

  13. A study of wet deposition of atmospheric tritium releases at the Ontario Power Generation, Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Crooks, G.; DeWilde, J.; Yu, L.

    2001-01-01

    The Ontario Power Generation,Pickering Nuclear Generating Station (PNGS) has been investigating deposition of atmospheric releases of tritium on their site. This study has included numerical dispersion modelling studies conducted over the past three years, as well as an ongoing field monitoring study. The following paper will present results of the field monitoring study and make comparisons to the numerical modelling. The results of this study could be of potential use to nuclear stations in quantifying tritium deposition in near field regions where building wake effects dominate pollutant dispersion

  14. Steam turbine generators for Sizewell 'B' nuclear power station

    International Nuclear Information System (INIS)

    Hesketh, J.A.; Muscroft, J.

    1990-01-01

    The thermodynamic cycle of the modern 3000 r/min steam turbine as applied at Sizewell 'B' is presented. Review is made of the factors affecting thermal efficiency including the special nature of the wet steam cycle and the use of moisture separation and steam reheating. Consideration is given to the optimization of the machine and cycle parameters, including particular attention to reheating and to the provision of feedheating, in order to achieve a high overall level of performance. A modular design approach has made available a family of machines suitable for the output range 600-1300 MW. The constructional features of the 630 MW Sizewell 'B' turbine generators from this range are described in detail. The importance of service experience with wet steam turbines and its influence on the design of modern turbines for pressurized water reactor (PWR) applications is discussed. (author)

  15. Acquisition of wood fuel at the Joseph C. McNeil Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Kropelin, W. [Burlington Electric Dept., VT (United States)

    1993-12-31

    The Joseph C. McNeil Generating Station is the world`s largest single boiler, municipally-owned, wood-fired electrical generating plant. The 50 megawatt McNeil Station is located in Burlington, Vermont and is owned by several Vermont public and private electric utilities. The operator and majority owner is the City of Burlington Electric Department (BED). Wood fuel procurement for the McNeil Station has been conducted in an environmentally sensitive way. Harvesting is carried out in conformance with a comprehensive wood chip harvesting policy and monitored by professional foresters. Unpredictable levels of Station operation require rigid adherence to a wood storage plan that minimizes the risk of over heating and spontaneous combustion of stockpiled fuel.

  16. Strategy for success in maintenance management at Point Lepreau nuclear generating station

    International Nuclear Information System (INIS)

    White, R.M.

    1987-01-01

    Improvements in availability of the station and in productivity of workers were achieved at Point Lepreau Nuclear Generating Station through implementation of a Maintenance Management System, which incorporates work planning and outage management techniques. Eight software systems on a VAX 11/70 minicomputer control work orders, temporary and permanent design changes, parts and material inventories, time keeping, and project management. All maintenance is coordinated through a regular planning meeting

  17. Environmental radiation monitoring data for Point Lepreau Generating Station, 1988. Annual publication

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, J K

    1989-01-01

    Annual report presenting a compilation of the 1988 environmental radiation monitoring program data from samples collected around the Point Lepreau Nuclear Generating Station (PLNGS) and at reference stations remote from PLNGS. About 1,700 analyses were made on 1,200 samples to monitor environmental radiation, including air filters, airborne water vapour, sea water, well water, milk, beach sediments, clams, fish, lobster, dulse, crabs, scallops and lichen. Background radiation is measured by thermoluminescence dosimetry.

  18. Environmental radiation monitoring data for Point Lepreau Generating Station, 1987. Annual publication

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, J K

    1988-01-01

    Annual report presenting a compilation of the 1987 environmental radiation monitoring program data from samples collected around the Point Lepreau Nuclear Generating Station (PLNGS) and at reference stations remote from PLNGS. About 1,800 analyses were made on 1,300 samples to monitor environmental radiation, including air filters, airborne water vapour, sea water, well water, milk, beach sediments, clams, fish, lobster, dulse, crabs, scallops and periwinkles. Background radiation is measured by thermoluminescence dosimetry.

  19. DESIGNING AND OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION

    Energy Technology Data Exchange (ETDEWEB)

    K. Payette; D. Tillman

    2004-06-01

    During the period July 1, 2000-March 31, 2004, Allegheny Energy Supply Co., LLC (Allegheny) conducted an extensive demonstration of woody biomass cofiring at its Willow Island and Albright Generating Stations. This demonstration, cofunded by USDOE and Allegheny, and supported by the Biomass Interest Group (BIG) of EPRI, evaluated the impacts of sawdust cofiring in both cyclone boilers and tangentially-fired pulverized coal boilers. The cofiring in the cyclone boiler--Willow Island Generating Station Unit No.2--evaluated the impacts of sawdust alone, and sawdust blended with tire-derived fuel. The biomass was blended with the coal on its way to the combustion system. The cofiring in the pulverized coal boiler--Albright Generating Station--evaluated the impact of cofiring on emissions of oxides of nitrogen (NO{sub x}) when the sawdust was injected separately into the furnace. The demonstration of woody biomass cofiring involved design, construction, and testing at each site. The results addressed impacts associated with operational issues--capacity, efficiency, and operability--as well as formation and control of airborne emissions such as NO{sub x}, sulfur dioxide (SO{sub 2}2), opacity, and mercury. The results of this extensive program are detailed in this report.

  20. Steam generator management at Ontario Hydro Nuclear Stations

    International Nuclear Information System (INIS)

    Nickerson, J.; Maruska, C.C.

    1998-01-01

    Managing ageing steam generators involves costly decisions for the utility, both in terms of the cost of the maintenance activities and in terms of having the unit shutdown and consequent power loss while performing these activities. The benefits of these activities are seldom guaranteed and are sometimes very intangible. For nuclear utilities the most pertinent questions that arise are have we identified all the problem(s), can we predict the risk due to these problems? Can we implement corrective and preventive activities to manage the problem and what is the optimum timing of implementation? Is the money spent worthwhile, i.e. has it given us a return in production and safety? Can we avoid surprises? How can we tangibly measure success? This paper touches briefly on all the questions mentioned above but it mainly addresses the last question: 'how can we tangibly measure success?' by using several success indicators proposed by EPRI and by applying them to actual Ontario Hydro experience. The appropriateness of these success indicators as the means to assess the success of these programs, to feed back the results, and to enhance or revise the programs will be discussed. (author)

  1. Steam generator management at Ontario Hydro Nuclear Stations

    Energy Technology Data Exchange (ETDEWEB)

    Nickerson, J. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada); Maruska, C.C. [Ontario Hydro, Toronto, Ontario (Canada)

    1998-07-01

    Managing ageing steam generators involves costly decisions for the utility, both in terms of the cost of the maintenance activities andin terms of having the unit shutdown and consequent power loss while performing these activities. The benefits of these activities are seldom guaranteed and are sometimes very intangible. For nuclear utilities the most pertinent questions that arise are have we identified all the problem(s), can we predict the risk due to these problems? Can we implement corrective and preventive activities to manage the problem and what is the optimum timing of implementation? Is the money spent worthwhile, i.e. has it given us a return in production and safety? Can we avoid surprises? How can we tangibly measure success? This paper touches briefly on all the questions mentioned above but it mainly addresses the last question: 'how can we tangibly measure success?' by using several success indicators proposed by EPRI and by applying them to actual Ontario Hydro experience. The appropriateness of these success indicators as the means to assess the success of these programs, to feed back the results, and to enhance or revise the programs will be discussed. (author)

  2. Characterization of solid radwaste generated at Virginia Power's Surry and North Anna stations

    International Nuclear Information System (INIS)

    Lippard, D.W.; Elguindy, H.; Nelson, R.A.

    1987-01-01

    This paper describes the results of a study on characterization of the major constituents of the solid radwaste generated at Virginia Power's North Anna and Surry Power Stations. The characterization consisted of identifying the individual constituents of the dry active waste (DAW) and estimating the fraction of the total DAW (both weight and volume) made up by each constituent. The analysis of the characterization of solid waste streams generated at both North Anna and Surry stations has lead to recommending techniques for both source minimization and waste volume reduction

  3. AECB staff annual assessment of the Bruce B Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Bruce Nuclear Generating Station B for 1996. It was concluded that Ontario Hydro operated Bruce B safely in 1996. Although the Bruce B plant is safe,it was noted that the number of outages and the number of secondary and tertiary equipment failures during reactor unit upsets increased. Ontario Hydro needs to pay special attention to prevent such a decrease in the safety performance at Bruce B

  4. AECB staff annual assessment of the Point Lepreau Nuclear Generating Station

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Point Lepreau Generating Station in 1996. Point Lepreau operated safely but the worsening trends in NB Power's safety performance leads to the conclusion that urgent action is required. NB Power is required to report formally to the AECB on progress with measures to improve safety management every six months. Further licensing action will be taken on NB Power if it fails to make the improvements

  5. AECB staff annual assessment of the Bruce A Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Bruce Nuclear Generating Station A for 1996. Ontario Hydro operated Bruce A safely in 1996, maintaining the risk to workers and the public at an acceptably low level. Special safety system performance at Bruce A was adequate. Availability targets were all met. Improvement is needed to reduce the number of operating licence non-compliances

  6. Next Generation Hydrogen Station Composite Data Products: All Stations (Retail and Non-Retail Combined), Data through Quarter 2 of 2017

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Samuel [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kurtz, Jennifer M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ainscough, Christopher D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Peters, Michael C [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-12-05

    This publication includes 95 composite data products (CDPs) produced for next generation hydrogen stations with data through the second quarter of 2017. These CDPs include data for all stations in NREL's evaluation (retail and non-retail combined).

  7. Next Generation Hydrogen Station Composite Data Products: All Stations (Retail and Non-Retail Combined), Data through Quarter 4 of 2016

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Sam [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Chris [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Peters, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-05-31

    This publication includes 90 composite data products (CDPs) produced for next generation hydrogen stations with data through the fourth quarter of 2016. These CDPs include data for all stations in NREL's evaluation (retail and non-retail combined).

  8. Next Generation Hydrogen Station Composite Data Products: All Stations (Retail and Non-Retail Combined), Data through Quarter 3 of 2016

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Sam [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Chris [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Peters, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jeffers, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-03-06

    This publication includes 87 composite data products (CDPs) produced for next generation hydrogen stations with data through the third quarter of 2016. These CDPs include data for all stations in NREL's evaluation (retail and non-retail combined).

  9. Criteria for the design of the control room complex for a nuclear power generating station

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This Standard addresses the central control room of a nuclear power generating station and the overall complex in which this room is housed. It is not intended to cover special or normally unattended control rooms, such as those provided for radioactive waste handling or for emergency shutdown operations. The nuclear power generating station control room complex provides a protective envelope for plant operating personnel and for instrument and control equipment vital to the operation of the plant during normal and abnormal conditions. In this capacity, the control room complex must be designed and constructed to meet the following criteria contained in Appendix A of 10CFR50, General Design criteria for Nuclear Power Plants: (1) Criterion 2: design bases for protection against natural phenomena; (2) Criterion 3: fire protection; (3) Criterion 4: environmental and missile design bases; (4) Criterion 5: sharing of structures, systems and components (multiunit stations only); and (5) Criterion 19: control room

  10. Electrical system design and reliability at Ontario Hydro nuclear generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Royce, C. J. [Ontario Hydro, 700 University Avenue, Toronto, Ontario M5G 1X6 (Canada)

    1986-02-15

    This paper provides an overview of design practice and the predicted and actual reliability of electrical station service Systems at Ontario Nuclear Generating Stations. Operational experience and licensing changes have indicated the desirability of improving reliability in certain instances. For example, the requirement to start large emergency coolant injection pumps resulted in the turbine generator units in a multi-unit station being used as a back-up power supply. Results of reliability analyses are discussed. To mitigate the effects of common mode events Ontario Hydro adopted a 'two group' approach to the design of safety related Systems. This 'two group' approach is reviewed and a single fully environmentally qualified standby power supply is proposed for future use. (author)

  11. Electricity Generation Through the Koeberg Nuclear Power Station of Eskom in South Africa

    International Nuclear Information System (INIS)

    Dladla, G.; Joubert, J.

    2015-01-01

    The poster provides information on the process of nuclear energy generation in a nuclear power plant in order to produce electricity. Nuclear energy currently provides approximately 11% of the world’s electricity needs, with Koeberg Nuclear Power Station situated in the Western Cape providing 4.4% of South Africa’s electricity needs. As Africa’s first nuclear power station, Koeberg has an installed capacity of 1910 MW of power. Koeberg’ s total net output is 1860 MW. While there are significant differences, there are many similarities between nuclear power plants and other electrical generating facilities. Uranium is used for fuel in nuclear power plants to make electricity. With the exception of solar, wind, and hydroelectric plants, all others including nuclear plants convert water to steam that spins the propeller-like blades of a turbine that spins the shaft of a generator. Inside the generator coils of wire and magnetic fields interact to create electricity. The energy needed to boil water into steam is produced in one of two ways: by burning coal, oil, or gas (fossil fuels) in a furnace or by splitting certain atoms of uranium in a nuclear energy plant. The uranium fuel generates heat through a controlled fission process fission, which is described in this poster presentation. The Koeberg Nuclear Power Station is a Pressurised water reactor (PWR). The operating method and the components of the Koeberg Power Station are also described. The nuclear waste generated at a nuclear power station is described under three headings— low-level waste, intermediate-level waste and used or spent fuel, which can be solid, liquid or gaseous. (author)

  12. Water use/reuse and wastewater management practices at selected Canadian coal fired generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Kissel, R.

    1984-08-01

    Recommended Codes of Practice are currently being developed by Environment Canada aimed at ensuring that the aquatic environment is not significantly impacted upon by wastewater discharges from steam electric generating stations. A study was carried out to: develop a reliable data base of the physical and chemical characteristics of water and wastewater streams at representative generating stations; study advanced water reuse/recirculation and wastewater management to evaluate their potential future use in power generating stations; and to examine and evaluate the relevant aspects of best practical technology as proposed by Environment Canada in the Recommended Codes of Practice. Studies were carried out at Dalhousie Generating Station (GS), New Brunswick, Poplar River GS, Saskatchewan, Battle River GS, Alberta, and Milner GS, Alberta. The studies included on-site flow monitoring and sampling, chemical analyses, treatability studies and engineering analyses of water and wastewater systems. Extensive chemical characterizations of the water and wastewater streams were completed. Some problems were identified with the recirculating bottom ash system at Dalhousie which was a significant wastewater producer, coal pile runoff which caused significant wastewater, and iron which was the principal discharge criteria metal. 14 refs., 41 figs., 2 tabs.

  13. Improvements to feed water system of vapor generators of nuclear power stations

    International Nuclear Information System (INIS)

    Byerlex, W.M.

    1976-01-01

    The description is given of a feed water system related to the steam generators for nuclear power stations and which have a water feed ring around their upper part. This water intake system enables water hammer to be avoided even during operation under low load [fr

  14. Manufacture of the 300 MW steam generator and pressure stabilizer for Qinshan Nuclear Power Station

    International Nuclear Information System (INIS)

    Qian Yi; Miao Deming.

    1989-01-01

    A brief description of the manufacturing process of the steam generator and pressure stabilizer for 300 MWe Qinshan Nuclear Power Station in Shanghai Boiler Works is presented, with special emphasis on fabrication facilities, test procedures and technological evaluations during the manufaturing process-imcluding deep driling of tubesheets, welding of tubes to tube-sheets and tube rolling tests

  15. Radioactive release data from Canadian nuclear generating stations 1872-1987

    International Nuclear Information System (INIS)

    1989-03-01

    All nuclear generating stations emit small quantities of radioactive effluent both into the atmosphere and in the form of liquid effluent, into the adjoining water body, be it river, lake or sea. The purpose of this document is to report on the magnitude of these emissions for each nuclear generating station in Canada and to indicate how these emissions compare with the relevant limitations imposed by the Atomic Energy Control Board as part of its regulatory and licensing program. This report incorporates histograms indicating the annual releases of tritium in air, noble gases, iodine-131, airborne particulates, tritium in water and waterborne gross beta activity for each nuclear generating station. In addition, for Pickering NGS 'A', annual released of carbon-14 are depicted for the years 1986 and 1987. In each case the emission data are compared to the Derived Emission Limit (DEL) in order that the data may be placed in perspective. At present, only Pickering NGS 'A' is required to monitor and report carbon-14 emissions. Environmental monitoring for C-14 is conducted around the Bruce site to determine the environmental impact of its emission and whether effluent monitoring will be necessary in future years. Three nuclear generating stations have been permanently taken out of service during the last few years (Gentilly NGS-1, Douglas Point NGS and NPD NGS). Some small emissions from these sites do still occur, however, due to decontamination and decommissioning operations. (11 tabs., 26 figs.)

  16. China's CO2 emissions from power generating stations: A first exploration

    OpenAIRE

    Du, Limin; Hanley, Aoife; Rehdanz, Katrin

    2014-01-01

    Our analysis is the first of its kind to explore patterns of subsidization and CO2 emissions in China's electricity producing sector. Applying data for all power plants across China and controlling for the age, capacity and location of generating stations, we find that plants attracting a higher government subsidy are also worryingly the plants generating a disproportionate share of CO2 emissions. This distortion is incongruent with China's aspiration for a greener economy but may be eliminat...

  17. Environmental management at the Grand Rapids Generating Station following the Unit No.1 headcover failure

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1993-01-01

    Failure of the headcover of Unit 1 in the Grand Rapids generating station in March, 1992 caused the station to flood, releasing several thousand gallons of oil and removing the station from service for several weeks. Environmental considerations were a considerable part of the station restoration activities, reservoir and flow management programs and responses to public concerns arising from the accident. A major oil spill containment and cleanup program was undertaken, with station cleanup and debris disposal carried out in a manner acceptable to environmental authorities. Reservoir spillage was necessitated by the station shutdown. The spill recreated fish habitat in the spillway and walleye spawning were documented. A compensation program was developed to respond to problems caused by debris flushed from the spillway channel. On spill termination, a fish salvage program removed fish from a scour hole in the spillway channel. A proactive program of public information provided local residents with the facts about the incident and response program, and allayed concerns about public safety. 4 refs., 2 figs

  18. Energy and exergy analysis of electricity generation from natural gas pressure reducing stations

    International Nuclear Information System (INIS)

    Neseli, Mehmet Alparslan; Ozgener, Onder; Ozgener, Leyla

    2015-01-01

    Highlights: • Forecasting the recoverable energy from natural gas pressure reduction stations. • Electricity generation through pressure reduction stations via turboexpanders. • A thermodynamics analysis of PRS. - Abstract: Electricity generation or power recovery through pressure reduction stations (PRS) for general use has not been realized in Izmir. The main objective of the present study was to do a case study for calculating electricity to be recovered in one natural gas pressure reduction stations in Izmir. It is the first forecasting study to obtain energy from natural gas pressure-reducing stations in Izmir. Energy can be obtained from natural gas PRS with turbo-expanders instead of using throttle valves or regulators from the PRS. The exergy performance of PRS with TE is evaluated in this study. Exergetic efficiencies of the system and components are determined to assess their individual performances. Based upon pressure change and volumetric flow rate, it can be obtained by recovering average estimated installed capacity and annual energy 494.24 kW, 4113.03 MW h, respectively. In terms of estimated installed capacity power and annual energy, the highest level is 764.88 kW, approximately 6365.34 MW h, in Aliaga PRS. Also it can be seen that CO 2 emission factor average value is 295.45 kg/MW h

  19. AECB staff annual assessment of the Darlington Nuclear Generating Station for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    This report is the Atomic ENergy Control Board staff assessment of safety at the Darlington Nuclear Generating Station for 1995. The report is based on observations made by our staff, and on information submitted to us by Ontario Hydro. Performance was satisfactory for all four special safety systems. In 1995, Ontario Hydro complied with the regulations made under the Atomic Energy Control Act, except for two instances of non-compliance with the Transport Packaging of Radioactive Materials Regulations. Radiation doses received by Ontario Hydro station staff were below the regulatory limits. In general Ontario Hydro's maintenance program was found satisfactory. 9 tabs

  20. Environmental radiation monitoring data for Point Lepreau Generating Station, 1990. Annual publication

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, J K

    1991-01-01

    Annual report presenting a compilation of the 1990 environmental radiation monitoring program data from samples collected around the Point Lepreau Nuclear Generating Station (PLNGS) and at reference stations remote from PLNGS. About 1,500 analyses were made on 1,100 samples to monitor environmental radiation, including air particulates, airborne water vapour, carbon dioxide in air, sea water, well water, milk, beach sediments, clams, fish, lobster, dulse, crabs, scallops, periwinkles, sea plants and lichen. Background radiation is measured by thermoluminescence dosimetry. Radon is not assessed.

  1. Experience on environmental qualification of safety-related components for Darlington Nuclear Generating Station

    International Nuclear Information System (INIS)

    Yu, A.S.; Kukreti, B.M.

    1987-01-01

    The proliferation of Nuclear Power Plant safety concerns has lead to increasing attention over the Environmental Qualification (EQ) of Nuclear Power Plant Safety-Related Components to provide the assurance that the safety related equipment will meet their intended functions during normal operation and postulated accident conditions. The environmental qualification of these components is also a Licensing requirement for Darlington Nuclear Generating Station. This paper provides an overview of EQ and the experience of a pilot project, in the qualification of the Main Moderator System safety-related functions for the Darlington Nuclear Generating Station currently under construction. It addresses the various phases of qualification from the identification of the EQ Safety-Related Components List, definition of location specific service conditions (normal, adbnormal and accident), safety-related functions, Environmental Qualification Assessments and finally, an EQ system summary report for the Main Moderator System. The results of the pilot project are discussed and the methodology reviewed. The paper concludes that the EQ Program developed for Darlington Nuclear Generating Station, as applied to the qualification of the Main Moderator System, contained all the elements necessary in the qualification of safety-related equipment. The approach taken in the qualification of the Moderator safety-related equipment proves to provide a sound framework for the qualification of other safety-related components in the station

  2. The competitive economics of a middle aged multi unit nuclear generating station

    International Nuclear Information System (INIS)

    Talbot, K.H.

    1994-01-01

    In 1992 Ontario Hydro's 15 year old 4 x 850 MWe Candu, Bruce A Nuclear Generating Station was predicted to need considerable capital investment to replace pressure tubes, steam generators and other prematurely ageing equipment in order to restore the station to high performance. Over the subsequent two years the station has undergone 2 major economic assessment studies which have confirmed the economic viability of continued operation of the plant. Declining demand for electricity in Ontario combined with a excess of generating capacity and a need to stabilise electricity rates have however forced significant operational cost reductions and reduced capital availability for rehabilitation work, it's medium and long term future remains in question. This presentation offers a practical illustration of the need to maintain steady high performance from nuclear generating plant via the appropriate life management techniques. The avoidance of mid life infusion of capital is considered as essential if nuclear generation is to successfully survive major changes in economic conditions. 2 tabs., 7 figs

  3. On the possibility of generation of cold and additional electric energy at thermal power stations

    Science.gov (United States)

    Klimenko, A. V.; Agababov, V. S.; Borisova, P. N.

    2017-06-01

    A layout of a cogeneration plant for centralized supply of the users with electricity and cold (ECCG plant) is presented. The basic components of the plant are an expander-generator unit (EGU) and a vapor-compression thermotransformer (VCTT). At the natural-gas-pressure-reducing stations, viz., gas-distribution stations and gas-control units, the plant is connected in parallel to a throttler and replaces the latter completely or partially. The plant operates using only the energy of the natural gas flow without burning the gas; therefore, it can be classified as a fuelless installation. The authors compare the thermodynamic efficiencies of a centralized cold supply system based on the proposed plant integrated into the thermal power station scheme and a decentralized cold supply system in which the cold is generated by electrically driven vapor-compression thermotransformers installed on the user's premises. To perform comparative analysis, the exergy efficiency was taken as the criterion since in one of the systems under investigation the electricity and the cold are generated, which are energies of different kinds. It is shown that the thermodynamic efficiency of the power supply using the proposed plant proves to be higher within the entire range of the parameters under consideration. The article presents the results of investigating the impact of the gas heating temperature upstream from the expander on the electric power of the plant, its total cooling capacity, and the cooling capacities of the heat exchangers installed downstream from the EGU and the evaporator of the VCTT. The results of calculations are discussed that show that the cold generated at the gas-control unit of a powerful thermal power station can be used for the centralized supply of the cold to the ventilation and conditioning systems of both the buildings of the power station and the neighboring dwelling houses, schools, and public facilities during the summer season.

  4. Design and installation of a strategically placed algae mesh barrier at OPG Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Marttila, D.; Patrick, P.; Gregoris, C.

    2009-01-01

    Ontario Power Generation's Pickering Nuclear has experienced a number of events in which attached algae have become entrained in the water intake costing approximately $30M over the 1995-2005 period as a result of deratings, Unit shutdowns and other operational issues. In 2005-2006 OPG and Kinectrics worked collaboratively on evaluating different potential solutions to reduce the impact of algae on the station. One of the solutions developed by Kinectrics included a strategically placed barrier net designed to regulate algae flow into the station intake. In 2006, Kinectrics designed and installed the system, the first of its kind at a Nuclear Power Plant in Canada. The system was operational by May 2007. OPG completed an effectiveness study in 2007 and concluded the barrier system had a beneficial effect on reducing algae impact on the station. (author)

  5. Rate of generation of tritium during the operation of Tsuruga Power Station Unit No. 2

    International Nuclear Information System (INIS)

    Funamoto, Hisao; Yoshinari, Masaharu; Fukuda, Masayuki; Makino, Shinichi; Watari, Tuneo

    1994-01-01

    Total amount of 3 H activity in primary coolant due to the operation of Tsuruga Power Station Unit No. 2 was estimated. The 3 H inventory was measured for samples from the spent fuel pool, primary coolant and miscellaneous tanks. From the result of the measurement and the data of environmental release of 3 H, the rate of generation of 3 H in the reactor was found to be 25 TBq/GWa. Since Tsuruga Power Station Unit No. 2 is a PWR type reactor, we presume that most of the 3 H in primary coolant is formed by 10 B(n, 2α) 3 H reaction. It is necessary to release about 23 TBq/GWa of 3 H to maintain the station inventory at the present level. (author)

  6. Socio-economic impacts of nuclear generating stations: summary report on the NRC post-licensing studies

    International Nuclear Information System (INIS)

    Chalmers, J.; Pijawka, D.; Branch, K.; Bergmann, P.; Flynn, J.; Flynn, C.

    1982-07-01

    Information is presented concerning the conceptual framework for the assessment of socioeconomic impacts; methodology for the post-licensing case studies; socioeconomic changes due to the construction and operation of nuclear generating stations; public response to the construction and operation of nuclear generating stations; socioeconomic consequences of the accident at Three Mile Island; the significance of socioeconomic change due to the construction and operation of nuclear generating stations; findings of the post-licensing studies relative to the nuclear station impact literature; and implications of the findings for projective assessments and planning studies

  7. 75 FR 15745 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-30

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Exemption 1.0 Background The Arizona Public Service Company (APS, the licensee) is the holder of Facility... Generating Station (PVNGS), Units 1, 2, and 3, respectively. The licenses provide, among other things, that...

  8. 75 FR 8149 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-02-23

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3... NPF-74, issued to the Arizona Public Service Company (APS, or the licensee), for operation of the Palo Verde Nuclear Generating Station (PVNGS, the facility), Units 1, 2, and 3, respectively, located in...

  9. 33 CFR 165.552 - Security Zone; Oyster Creek Generation Station, Forked River, Ocean County, New Jersey.

    Science.gov (United States)

    2010-07-01

    ... Generation Station, Forked River, Ocean County, New Jersey. 165.552 Section 165.552 Navigation and Navigable... Coast Guard District § 165.552 Security Zone; Oyster Creek Generation Station, Forked River, Ocean... part. (2) No person or vessel may enter or navigate within this security zone unless authorized to do...

  10. 76 FR 45301 - PSEG Nuclear LLC, Hope Creek Generating Station; Notice of Issuance of Renewed Facility Operating...

    Science.gov (United States)

    2011-07-28

    ... NUCLEAR REGULATORY COMMISSION Docket No. 50-354 [NRC-2009-0391] PSEG Nuclear LLC, Hope Creek... operator of the Hope Creek Generating Station (HCGS). Renewed Facility Operating License No. NPF- 57... Renewal of Nuclear Power Plants, Supplement 45, Regarding Hope Creek Generating Station and Salem Nuclear...

  11. Some environmental effects of emissions from CANDU nuclear generating stations and heavy water plants

    International Nuclear Information System (INIS)

    Effer, W.R.

    Non-radioactive releases during normal operation of Ontario Hydro's nuclear generating stations and heavy water plants are summarized and related to existing regulations and guidelines. Low-grade heat in the circulating cooling water discharge is the most important of the non-radioactive effluents. Some of the hydrological, biological and water quality aspects of thermal discharges are discussed in relation to the operation of Ontario Hydro's thermal generating stations on the Great Lakes. Chemical releases to air or water include chlorine, hydrogen sulphide, water treatment plant effluents, oily waste water and sewage lagoon effluents. The significance of the first two of these releases to the environment is reviewed, particularly in relation to Great Lakes water quality and biological concerns. (author)

  12. Audit of Wolf Creek Generating Station, Unit 1 technical specifications. Final technical evaluation report

    International Nuclear Information System (INIS)

    Stromberg, H.M.

    1985-07-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Wolf Creek Generating Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, the requirements of the Safety Evaluation Report (SER) as supplemented, and the Comments and Responses to the Wolf Creek Technical Specification Draft Inspection Report. A comparative audit of the FSAR as amended, the SER as supplemented, and the Draft Inspection Report was performed with the Wolf Creek T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Wolf Creek Generating Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR, SER, and Draft Inspection Report

  13. Generating power stations and optimization energetic of processes; Centrales generadoras y optimacion energetica de procesos

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez Ramirez, Ranulfo; Fernandez Montiel, Manuel Francisco [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    1999-07-01

    Some recent experiences of the Management of Thermal Processes of the Instituto de Investigaciones Electricas (IIE) related to the works on generating power stations of electricity, plants of cogeneration and energy saving are presented. [Spanish] Se presentan algunas experiencias recientes de la Gerencia de Procesos Termicos del Instituto de Investigaciones Electricas (IIE) relacionadas con los trabajos sobre centrales generadoras de electricidad, plantas de cogeneracion y ahorro de energia.

  14. Aerial radiological survey of the San Onofre Nuclear Generating Station and surrounding area, San Clemente, California

    International Nuclear Information System (INIS)

    Hilton, L.K.

    1980-12-01

    An airborne radiological survey of an 11 km 2 area surrounding the San Onofre Nuclear Generating Station was made 9 to 17 January 1980. Count rates observed at 60 m altitude were converted to exposure rates at 1 m above the ground and are presented in the form of an isopleth map. Detected radioisotopes and their associated gamma ray exposure rates were consistent with that expected from normal background emitters, except directly over the plant

  15. IEEE Standard for qualification of Class 1E lead storage batteries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This document describes qualification methods for Class 1E lead storage batteries and racks to be used in nuclear power generating stations outside of primary containment. Qualification required in ANSI/IEEE Std 279-1979 and IEEE Std 308-1978, can be demonstrated by using the procedures provided in this Standard in accordance with IEEE Std 323-1974. Battery sizing, maintenance, capacity testing, installation, charging equipment and consideration of other types batteries are beyond the scope of this Standard

  16. IEEE standard for qualification of class 1E lead storage batteries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    IEEE Std 323-1974, Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, was developed to provide guidance for demonstrating and documenting the adequacy of electrical equipment used in all Class 1E and interface systems. This standard, IEEE Std 535-1979, was developed to provide specific methods and type test procedures for lead storage batteries in reference to IEEE Std 323-1974

  17. IEEE guide for general principles of reliability analysis of nuclear power generating station protection systems

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Presented is the Institute of Electrical and Electronics Engineers, Inc. (IEEE) guide for general principles of reliability analysis of nuclear power generating station protection systems. The document has been prepared to provide the basic principles needed to conduct a reliability analysis of protection systems. Included is information on qualitative and quantitative analysis, guides for failure data acquisition and use, and guide for establishment of intervals

  18. IEEE standard for qualifying class IE equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    The Institute of Electrical and Electrical Engineers, Inc. (IEEE) standards for electrical equipment (Class IE) for nuclear power generating stations are given. The standards are to provide guidance for demonstrating and documenting the adequacy of electric equipment used in all Class IE and interface systems. Representative in containment design basis event conditions for the principal reactor types are included in the appendixes for guidance in enviromental simulation

  19. The ''controbloc'', a programmable automatic device for the 1,300 MW generation of power stations

    International Nuclear Information System (INIS)

    Pralus, B.; Winzelle, J.C.

    1983-01-01

    Technological progress in the field of microelectronics has led to the development of an automatic control device, the ''controbloc'', for operating and controlling nuclear power plants. The ''controbloc'' will be used in automatic systems with a high degree of safety and versatility and is now being installed in the first of the new generation 1,300 MW power stations. The main characteristics of the device and the evaluation tests which have been carried out are described [fr

  20. Insulation co-ordination aspects for power stations with generator circuit-breakers

    International Nuclear Information System (INIS)

    Sanders, M.; Koeppl, G.; Kreuzer, J.

    1995-01-01

    The generator circuit-breaker (gen. c.b.) located between the generator and the step-up transformer, is now being applied world-wide. It has become a recognized electrical component of power stations which is largely due to economical advantages and increased power station availability. Technical protection considerations for power stations have always been the reason for discussion and the object of improvement. With the use of a gen. c.b., some points of view need to be considered anew. Not only the protection system in case of fault conditions will be influenced, but also the insulation co-ordination philosophy. Below the results of some calculations concerning expected overvoltages are presented. These calculations are based on a transformer rated 264/15.5kV, 220 MVA. But the results are transferable to other power plants. Some measurements carried out on a transformer of the same rating complement the calculations. The findings may contribute to an improvement in insulation co-ordination and protection of the electrical system generator--step-up transformer

  1. Study of sources, dose contribution and control measures of Argon-41 at Kaiga Generating Station

    International Nuclear Information System (INIS)

    Venkata Ramana, K.; Shrikrishna, U.V.; Manojkumar, M.; Ramesh, R.; Madhan, V.; Varadhan, R.S.

    2001-01-01

    Air is used as a medium for cooling calandria vault and thermal shield systems in the earlier Pressurised Heavy Water Reactors (Rajasthan Atomic Power Station and Madras Atomic Power Station) in India. This leads to production of significant quantity of 41 Ar in calandria vault and thermal shield cooling systems due to neutron activation of 40 Ar present in air (∼1% v/v). The presence of 41 Ar in reactor building contributes significant external doses to plant personnel during reactor operation and the release of this radionuclide to the environment result in dose to the public in the vicinity of the plants. An attempt is made to eliminate Argon-41 production in Indian standard Pressurised Heavy Water Reactors (Narora Atomic Power Station, Kakrapar Atomic Power Station, Kaiga Generating Station -1 and 2 and Rajasthan Atomic Power Station-3 and 4), by filling the calandria vault with demineralized water and providing a separate Annulus Gas Monitoring System (AGMS) for detecting leaks from calandria tube or pressure tube using Carbon dioxide as a medium. However, 41 Ar is produced in the Annulus Gas Monitoring System, Primary Heat Transport cover gas system and moderator cover gas system due to ingress of air into the systems during operational transients or due to trace quantity of air present as an impurity in the gases used for the above systems. A study was conducted to identify and quantify the sources of 41 Ar in the work areas. This report brings out the sources of 41 Ar, reasons for 41 Ar production and the results of the measures incorporated to reduce the presence of 41 Ar in the above systems. (author)

  2. AECB staff annual assessment of the Point Lepreau Nuclear Generating Station for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    This report is the Atomic Energy Control Board assessment of safety at Point Lepreau Generating Station for 1994. AECB on-site Project Officers, and Ottawa based specialists monitored the station throughout the year. The station operated safely during 1994. Performance of the special safety systems was very good, and NB Power made important progress improving the safety management of these systems. NB Power staff failed to comply with the conditions of our Operating Licence seven times during 1994. This is an improvement from last year, but the number of compliance problems is still too high. NB Power introduced safety culture training for its staff last year. AECB is optimistic that this will help to improve compliance. The station fully met the radiation safety requirements during the year. Releases of radioactive material to the environment are well below the limits set. Radiation exposure to workers are being well controlled, and AECB believe that NB Power is maintaining these exposures 'As Low As Reasonably Achievable' for this reactor type

  3. Review of occupational radiation exposures in all biennial shutdown maintenance of Kaiga generating station

    International Nuclear Information System (INIS)

    Murukan, E.K.; Vinod Kumar, T.; Austine, N.X.; Soumia Menon, M.; Girish Kumar, K.; Rao, M.M.L.N.; Venkataramana, K.

    2008-01-01

    Full text: Kaiga generating station 1 and 2 consists of twin units of 220 M We pressurized heavy water reactors located in Karnataka, India. Major maintenance activities of one of the twin units are taken up once in two years (biennial shutdown) to execute system maintenance, system up gradation, surveillance and in-service inspection (ISI) jobs. BSDs are mandatory activities to comply with regulatory requirement to ensure the safety and reliability of plant system equipment. More than 65% of the station collective dose is contributed by biennial shutdown (BSD) jobs. It is observed that the man rem consumed during normal operation of the plant is less than 35% of the total man rem consumed. Since BSD jobs contributes significantly to station collective dose, an effective implementation of radiation protection programme specific to BSD is the key to control the occupational exposure. Various improvements in the field of radiation protection practices and process systems are adopted to achieve lowest collective dose at par with international standards. The key areas identified for application of various strategies to achieve ALARA were Man rem budgeting, Radiological condition monitoring, Radiation protection practices, Identification of critical jobs and Work groups, Work planning and execution, and Radioactive waste management. Review of collective doses of all the BSD jobs performed in the station since year 2004 and various measures incorporated to achieve ALARA exposures to plant personnel are briefly discussed in this paper. (author)

  4. AECB staff annual assessment of the Point Lepreau Nuclear Generating Station for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    The Atomic Energy Control Board conducts a staff assessment of safety at Point Lepreau Generating Station for 1995. On-site Project Officers and Ottawa based specialists monitored the station throughout the year. Point Lepreau operated safely during 1995 which was an unusual year for the station. The station was shut down for a planned five month outage to allow NB Power to complete maintenance on the reactor's pressure tubes. NB Power failed to comply with the terms of the Operating Licence we issue on fourteen occasions in 1995. In addition, NB Power reported an unusually large number of events. None of the events themselves directly affected public safety, if this level of performance continues unchecked, it might result in increased risk from operation in the future. Human error was an important feature of these problems. NB Power had already introduced safety culture training for their staff, but they will need to undertake further work urgently to resolve the problems. Three of Point Lepreau's special safety systems failed to meet their availability targets during 1995. NB Power's safety analysis program progress slowed during 1995, due to the additional workload from the outage. The Point Lepreau's training, quality assurance and safeguards related activities continued to function satisfactorily. They have assigned additional resources to emergency preparedness planning, which should enable them to take a more pro-active approach in this area. 7 tabs., 5 figs

  5. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  6. Models for the transient stability of conventional power generating stations connected to low inertia systems

    Science.gov (United States)

    Zarifakis, Marios; Coffey, William T.; Kalmykov, Yuri P.; Titov, Sergei V.

    2017-06-01

    An ever-increasing requirement to integrate greater amounts of electrical energy from renewable sources especially from wind turbines and solar photo-voltaic installations exists and recent experience in the island of Ireland demonstrates that this requirement influences the behaviour of conventional generating stations. One observation is the change in the electrical power output of synchronous generators following a transient disturbance especially their oscillatory behaviour accompanied by similar oscillatory behaviour of the grid frequency, both becoming more pronounced with reducing grid inertia. This behaviour cannot be reproduced with existing mathematical models indicating that an understanding of the behaviour of synchronous generators, subjected to various disturbances especially in a system with low inertia requires a new modelling technique. Thus two models of a generating station based on a double pendulum described by a system of coupled nonlinear differential equations and suitable for analysis of its stability corresponding to infinite or finite grid inertia are presented. Formal analytic solutions of the equations of motion are given and compared with numerical solutions. In particular the new finite grid model will allow one to identify limitations to the operational range of the synchronous generators used in conventional power generation and also to identify limits, such as the allowable Rate of Change of Frequency which is currently set to ± 0.5 Hz/s and is a major factor in describing the volatility of a grid as well as identifying requirements to the total inertia necessary, which is currently provided by conventional power generators only, thus allowing one to maximise the usage of grid connected non-synchronous generators, e.g., wind turbines and solar photo-voltaic installations.

  7. AECB staff annual assessment of the Bruce A Nuclear Generating Station for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    The Atomic Energy Control Board conducts a staff assessment of safety at Bruce Nuclear Generating Station A for 1995. On-site Project Officers and Ottawa based specialists monitored the station throughout the year. Ontario Hydro operated Bruce A safely in 1995, maintaining the risk to workers and the public at an acceptably low level. Radiation doses to workers and releases to the environment were well below regulatory limits. However, Ontario Hydro must improve contamination control at Bruce A. Special safety system performance a Bruce A was less than adequate. The negative pressure containment system and units 4's shutdown system two exceeded unavailability targets in 1995. However, we are satisfied Ontario Hydro is taking appropriate action to correct this. 5 tabs., 5 figs

  8. A Potential Transmitter Architecture for Future Generation Green Wireless Base Station

    Directory of Open Access Journals (Sweden)

    Mike Faulkner

    2009-01-01

    Full Text Available Current radio frequency power amplifiers in 3G base stations have very high power consumption leading to a hefty cost and negative environmental impact. In this paper, we propose a potential architecture design for future wireless base station. Issues associated with components of the architecture are investigated. The all-digital transmitter architecture uses a combination of envelope elimination and restoration (EER and pulse width modulation (PWM/pulse position modulation (PPM modulation. The performance of this architecture is predicted from the measured output power and efficiency curves of a GaN amplifier. 57% efficiency is obtained for an OFDM signal limited to 8 dB peak to average power ratio. The PWM/PPM drive signal is generated using the improved Cartesian sigma delta techniques. It is shown that an RF oversampling by a factor of four meets the WLAN spectral mask, and WCDMA specification is met by an RF oversampling of sixteen.

  9. AECB staff annual assessment of the Bruce B Nuclear Generating Station for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    AECB staff believes Ontario Hydro operated Bruce B safely in 1994. The Bruce B reactors will remain limited to 88% full power until Ontario Hydro is able to demonstrate that it is safe to operate at higher powers. Ontario Hydro's compliance with AECB regulations and the Operating Licence was satisfactory. AECB found no major violations. The station performance was similar to previous years. Radiation doses to workers and the public were well below the legal limits and also remained below Ontario Hydro's internal targets. Worker radiation doses increased slightly but were comparable to previous years. Inspection of pressure tubes and steam generator tubes by Ontario Hydro showed continuing tube degradation. However, we believe that Ontario Hydro made progress in correcting and managing these problems. Ontario Hydro carried out a full-scale fire drill at Bruce B in 1994. AECB witnessed the drill and were pleased to observe a significant improvement in the station's fire-fighting capability. 7 tabs., 4 figs

  10. Likelihood and consequences of fuel string compression at Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Reid, P.J.; Gibb, R.A.

    1996-01-01

    During an accident which results in fuel heatup, axial thermal expansion of the fuel string relative to the pressure tube will occur. If the temperature transient is sufficiently severe, the fuel string may contact the shieled plugs at both ends of the channel. Any additional axial thermal expansion will result in deformation of fuel and fuel channel components, leading to tensile or compressive stresses in the different fuel channel components. If these loads become sufficiently large, they could result in failure of a fuel channel component or to channel failure due to bending of a fuel element under load. The analysis described in this paper demonstrates that this process would not result in fuel channel failure for a design basis accident at Point Lepreau Generating Station (PLGS), even if the station were retubed to 'as-built' channel lengths. (author)

  11. Processing of sump sludges at the Commonwealth Edison Byron Nuclear Generating Station

    International Nuclear Information System (INIS)

    Herrmann, D.; Gardner, D.A.; Taylor, E.R. Jr.

    1990-01-01

    A basic criterion for the disposal of radioactive waste by shallow land burial is that the material must not contain free liquids. In addition burial sites' requirements regarding radioactive waste containing oils, even though solidified, are restrictive. At Commonwealth Edison Byron Nuclear Generating Station a methodology for processing treated waste sludges, originating form the turbine building's floor drains was developed and implemented. As a result of this effort, 322 drums of oil and water sludge were processed. A dry cake, i.e., no free liquids, was produced, packaged, and readied for disposal. The dry cake contained less than 2% oil. The liquid phases resulting from the processing of the treated waste sludge were oil (that was to be processed for disposal as non-radioactive) and filtrate containing less than 5 ppm total suspended solids (TSS) and oil/grease. The filtrate TSS was below the Station's National Pollution Discharge Elimination System (NPDES) permit release limits. 4 figs

  12. Characterization of potential zones of dust generation at eleven stations in the southern Sahara

    Science.gov (United States)

    Clark, I.; Assamoi, P.; Bertrand, J.; Giorgi, F.

    Synoptic wind data for multi-decadal periods at eleven stations located in the southern Sahara region (Agadez, Atar, Bilma, Dori, Gao, Kayes, Nema, Niamey, Nouadhibou, Ouagadougou and Tessalit) are used to study the monthly dust deflation power over the region. We found that, regardless of the conditions of the soil, the deflation power (or wind efficiency) is not sufficient to generate significant amounts of aerosols south of 15°N. North of this latitude, the deflation power is much larger, with potential zones of either very strong deflation (Nouadhibou and Bilma) or severe deflation (Gao, Tessalit, Nema, Atar, Agadez). Stations in the Sahel region such as Gao, Agadez and Tessalit are characterized by a gradual reinforcement of the deflation power between 1970 and 1984 in correspondence of increasing desertification over the region. During this same period, Bilma, a well know region of dust source, experienced a major reduction in deflation power due to shifts in large scale wind patterns.

  13. A Potential Transmitter Architecture for Future Generation Green Wireless Base Station

    Directory of Open Access Journals (Sweden)

    Cijvat Ellie

    2009-01-01

    Full Text Available Abstract Current radio frequency power amplifiers in 3G base stations have very high power consumption leading to a hefty cost and negative environmental impact. In this paper, we propose a potential architecture design for future wireless base station. Issues associated with components of the architecture are investigated. The all-digital transmitter architecture uses a combination of envelope elimination and restoration (EER and pulse width modulation (PWM/pulse position modulation (PPM modulation. The performance of this architecture is predicted from the measured output power and efficiency curves of a GaN amplifier. 57% efficiency is obtained for an OFDM signal limited to 8 dB peak to average power ratio. The PWM/PPM drive signal is generated using the improved Cartesian sigma delta techniques. It is shown that an RF oversampling by a factor of four meets the WLAN spectral mask, and WCDMA specification is met by an RF oversampling of sixteen.

  14. Pre-license team training at San Onofre Nuclear Generating Station

    International Nuclear Information System (INIS)

    Freers, S.M.; Hyman, M.

    1987-01-01

    Team Training at San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 has been developed to enhance the performance of station operations personnel. The FACT Training Program (Formality, Attention to Detail, Consistency and Team Effort) is the common denominator for operations team training. Compliance with good operating practices is enhanced by operators working as a team toward the same goal, using the same language, practicing the same operating and communication skills, possessing a clear understanding of individual roles and responsibilities of team members and practicing attention to detail in every task. These elements of effective teamwork are emphasized by the processes and criteria used in the Pre-License Operator Training Program at SONGS

  15. Chemistry, materials and related problems in steam generators of power stations

    International Nuclear Information System (INIS)

    Mathur, P.K.

    2000-01-01

    The operational reliability and availability of power plants are considerably influenced by chemical factors. Researches all over the world indicate that several difficulties in power plants can be traced to off-normal or abnormal water chemistry conditions. Whatever the source of energy, be it fossil fuel or nuclear fuel, the ultimate aim is steam generation to drive a turbine. It is, therefore, natural that problems of water chemistry and material compatibility are similar in thermal and nuclear power stations. The present paper discusses various types of problems in the form of corrosion damages, taking place in the boiler-turbine cycles and describes different types of boiler feed water/boiler water treatments that have been in use both in nuclear and thermal power stations. Current positions in relation to requirements of boiler feed water, boiler water and steam quality have been described

  16. Process for improving the load factor of an electricity generating power station

    International Nuclear Information System (INIS)

    Rostaing, Michel.

    1974-01-01

    A description is given of a process for improving the load factor of an electricity generating power station feeding a supply network in which all or part of the power not required by the network during off-peak hours is used for producing hydrogen which is then stored. The stored hydrogen is then burned and the heat generated is employed for superheating the steam generated by the nuclear reactor of the power plant. This combustion is carried out permanently. The hydrogen is produced by water electrolysis. The oxygen also produced in this manner is used as a comburent in the combustion of the hydrogen. The reactor is of the pressurized water type [fr

  17. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    Energy Technology Data Exchange (ETDEWEB)

    Charcharos, A N; Jones, A G [National Nuclear Corp. Ltd., Cheshire (United Kingdom)

    1984-07-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  18. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    International Nuclear Information System (INIS)

    Charcharos, A.N.; Jones, A.G.

    1984-01-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  19. Purification and solidification of reactor wastes at a Canadian nuclear generating station

    International Nuclear Information System (INIS)

    Buckley, L.P.; Burt, D.A.

    1981-01-01

    The study aimed at development and demonstration of volume reduction and solidification of CANDU reactor wastes has been underway at Chalk River Nuclear Laboratories in the Province of Ontario, Canada. The study comprises membrane separation processes, evaporator appraisal and immobilization of concentrated wastes in bitumen. This paper discusses the development work with a wiped-film evaporator and the successful completion of demonstration tests at Douglas Point Nuclear Generating Station. Heavy water from the moderator system was purified and wastes arising from pump bowl decontamination were immobilized in bitumen with the wiped-film evaporator that was used in the development tests at Chalk River

  20. Safety research of insulating materials of cable for nuclear power generating station

    Science.gov (United States)

    Lee, C. K.; Choi, J. H.; Kong, Y. K.; Chang, H. S.

    1988-01-01

    The polymers PE, EPR, PVC, Neoprene, CSP, CLPE, EP and other similar substances are frequently used as insulation and protective covering for cables used in nuclear power generating stations. In order to test these materials for flame retardation, environmental resistance, and cable specifications, they were given the cable normal test, flame test, chemical tests, and subjected to design analysis and loss of coolant accident tests. Material was collected on spark tests and actual experience standards were established through these contributions and technology was accumulated.

  1. Internal fire analysis screening methodology for the Salem Nuclear Generating Station

    International Nuclear Information System (INIS)

    Eide, S.; Bertucio, R.; Quilici, M.; Bearden, R.

    1989-01-01

    This paper reports on an internal fire analysis screening methodology that has been utilized for the Salem Nuclear Generating Station (SNGS) Probabilistic Risk Assessment (PRA). The methodology was first developed and applied in the Brunswick Steam Electric Plant (BSEP) PRA. The SNGS application includes several improvements and extensions to the original methodology. The SNGS approach differs significantly from traditional fire analysis methodologies by providing a much more detailed treatment of transient combustibles. This level of detail results in a model which is more usable for assisting in the management of fire risk at the plant

  2. Quality management for design engineering for San Onofre nuclear generating station

    International Nuclear Information System (INIS)

    Thompson, P.C.; Baker, R.L.

    1991-01-01

    Quality management, as applied to design engineering for the San Onofre nuclear generating station, provides a systematic process for data collection and analysis of performance indicators for quality, cost, and delivery of design modifications for the three operating units. Southern California Edison (SCE) and Bechtel Power Corporation (BPC) have collaborated to establish a performance baseline from nearly 2 years of data. This paper discusses how the baseline was developed and how it can be used to predict and assess future performance. It further discusses new insights to the engineering process and opportunities for improvements that have been identified

  3. Examination of failed studs from No. 2 steam generator at the Maine Yankee Nuclear Power Station

    International Nuclear Information System (INIS)

    Czajkowski, C.

    1983-02-01

    Three studs removed from service on the primary manway cover from steam generator No. 2 of the Maine Yankee station were sent to Brookhaven National Laboratory (BNL) for examination. The examination consisted of visual/dye penetrant examination, optical metallography and Scanning Electron Microscopy/Energy Dispersive Spectroscopy (SEM/EDS) evaluation. One bolt was through cracked and its fracture face was generally transgranular in nature with numerous secondary intergranular cracks. The report concludes that the environmenally assisted cracking of the stud was due to the interaction of the various lubricants used with steam leaks associated with this manway cover

  4. Environmental and public interface for Point Aconi generating station, Point Aconi, Nova Scotia

    Energy Technology Data Exchange (ETDEWEB)

    Toner, T P

    1993-01-01

    Nova Scotia Power's most recent generating station is a 165 MW coal-fired circulating fluidized bed (CFB) unit located at Point Aconi on the northern tip of Boularderie Island. This paper discusses the environmental and public interfaces associated with this project, particularly on the unique items and issues requiring delicate and/or innovative approaches for their successful completion. Specific issues discussed include clarification of the process, the turnkey arrangement, the community liaison committee, freshwater supply, air emissions and dealings with commercial growers, dealings with lobster fishermen, dealings with Native peoples, and the transmission line.

  5. Using the International Space Station (ISS) Oxygen Generation Assembly (OGA) Is Not Feasible for Mars Transit

    Science.gov (United States)

    Jones, Harry W.

    2016-01-01

    A review of two papers on improving the International Space Station (ISS) Oxygen Generation Assembly (OGA) shows that it would not save substantial mass on a Mars transit. The ISS OGA requires redesign for satisfactory operation, even for the ISS. The planned improvements of the OGA for ISS would not be sufficient to make it suitable for Mars, because Mars transit life support has significantly different requirements than ISS. The OGA for Mars should have lower mass, better reliability and maintainability, greater safety, radiation hardening, and capability for quiescent operation. NASA's methodical, disciplined systems engineering process should be used to develop the appropriate system.

  6. Cost comparison of 4x500 MW coal-fuelled and 4x850 MW CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Costa, M.

    1981-01-01

    The lifetime costs for a 4x850 MW CANDU generating station are compared to those for 4x500 MW bituminous coal-fuelled generating stations. Two types of coal-fuelled stations are considered; one burning U.S. coal which includes flue gas desulfurization and one burning Western Canadian coal. Current estimates for the capital costs, operation and maintenance costs, fuel costs, decommissioning costs and irradiated fuel management costs are shown. The results show: (1) The accumulated discounted costs of nuclear generation, although initially higher, are lower than coal-fuelled generation after two or three years. (2) Fuel costs provide the major contribution to the total lifetime costs for coal-fuelled stations whereas capital costs are the major item for the nuclear station. (3) The break even lifetime capacity factor between nuclear and U.S. coal-fuelled generation is projected to be 5%; that for nuclear and Canadian coal-fuelled generation is projected to be 9%. (4) Large variations in the costs are required before the cost advantage of nuclear generation is lost. (5) Comparison with previous results shows that the nuclear alternative has a greater cost advantage in the current assessment. (6) The total unit energy cost remains approximately constant throughout the station life for nuclear generation while that for coal-fuelled generation increases significantly due to escalating fuel costs. The 1978 and 1979 actual total unit energy cost to the consumer for several Ontario Hydro stations are detailed, and projected total unit energy costs for several Ontario Hydro stations are shown in terms of escalated dollars and in 1980 constant dollars

  7. Radioactivity in coal, ashes and selected wastewaters from Canadian coal-fired steam electric generating stations

    International Nuclear Information System (INIS)

    1985-09-01

    Coal is known to contain naturally occurring radioactive elements and there has been speculation that as a results, coal-fuelled power generation stations may be significant emitters of these substances. In this report, the subject of radioactivity is introduced. The kinds of radioactive substances which occur naturally in coal formations, the nature of their emissions and the existing information on their behaviour and their effects on environmental organisms are also reviewed. The results of an examination of levels of alpha, beta and gamma radiaton levels, and the substances which produce them in coals, fly ashes, bottom ashes and related wastewaters at six Canadian coal-fuelled power stations are presented. Difficulties in studies of this nature and the potential effects of these releases on organisms in the adjacent aquatic environment are discussed. Existing and potential technologies for the removal of these substances from wastewaters are examined. In general the releases in wastewaters from the six stations were found to be lower than those known to cause short-term or acute biological effects. The potential for long-term effects from such low-level releases could not be accurately assessed because of the paucity of information. A number of recommendations for: improvements in further studies of this nature; the further examination of the fate of naturally occurring radionuclides in the environment; and the determination of the long-term effects of low levels of naturally occurring radioactive substances on aquatic organisms, are made

  8. Photovoltaic power generation field test at Saigo Police Station (police station in a heavy-snow district); Saigo keisatsusho taiyoko hatsuden field test jigyo (sekisetsu chiku no keisatsusho)

    Energy Technology Data Exchange (ETDEWEB)

    Matsuo, S. [Shimane Prefectural Police Department, Shimane (Japan)

    1997-05-30

    Contents of a fiscal 1996 photovoltaic power generation field test at a police station in a heavy-snow district are reported. The system is on the rooftop of the garage of Saigo Police Station, Saigo-cho, Shimane Prefecture, and is used for lighting, airconditioning, etc., in the police station. It is 15kW in capacity and operates on high-voltage interconnection (with back flow). The array is a 9-series/17-parallel (polycrystalline modules) system, facing 15deg eastward from due south and inclined at an angle of elevation of 17deg. Dead space on the roof is used for solar cell installation, and the applicability and stability of the photovoltaic power generation system, as installed at a police station in a heavy-snow district, were verified and, at the same, operation data were collected. The data will serve as guidelines for construction in the future, and will enable understanding about how a distributed type power generation plant should be on an isolated island. The compilation of various data about its system interconnection (with back flow) with the commercial power source is meaningful because it will work effectively in popularizing the photovoltaic power generation system. Efforts to appeal to the local population are under way, which includes letting visitors into a terrace, distributing advertising pamphlets, etc., which are quite effective in enlightening people of the new energy producing technology

  9. IEEE Std 649-1980: IEEE standard for qualifying Class 1E motor control centers for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard describes the basic principles, requirements, and methods for qualifying Class 1E motor control centers for outside containment applications in nuclear power generating stations. Qualification of motor control centers located inside containment in a nuclear power generating station is beyond the scope of this standard. The purpose of this standard is (1) to define specific qualification requirements for Class 1E motor control centers in accordance with the more general qualification requirements of IEEE Std 323-1974, IEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations; (2) to provide guidance in establishing a qualification program for demonstrating the design adequacy of Class 1E motor control centers in nuclear power generating station applications

  10. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Pickering Nuclear Generating Station (PNGS) is located on the north shore of Lake Ontario, about 32 km east of downtown Toronto. It consists of two stations, PNGS-A and PNGS-B. Each station contains four reactor units. PNGS-A consists of Units 1 to 4, while PNGS-B consists of Units 5 to 8. Each unit can generate about 540 megawatts of electricity. All eight units are located within a single enclosure. Ontario Hydro`s Pickering Nuclear Division has assigned one Station Director with authority over both stations, but each station has its own organization. AECB issue a separate operating licence for each station. This report presents the Atomic Energy Control Board staff assessment of the Pickering stations` safety performance in 1994 and other aspects that they consider to have significant impact on nuclear safety. AECB based their conclusions on their observations, audits, inspections and review of information that Ontario Hydro submits to them as required by the station Operating Licences. 11 tabs., 8 figs.

  11. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    The Pickering Nuclear Generating Station (PNGS) is located on the north shore of Lake Ontario, about 32 km east of downtown Toronto. It consists of two stations, PNGS-A and PNGS-B. Each station contains four reactor units. PNGS-A consists of Units 1 to 4, while PNGS-B consists of Units 5 to 8. Each unit can generate about 540 megawatts of electricity. All eight units are located within a single enclosure. Ontario Hydro's Pickering Nuclear Division has assigned one Station Director with authority over both stations, but each station has its own organization. AECB issue a separate operating licence for each station. This report presents the Atomic Energy Control Board staff assessment of the Pickering stations' safety performance in 1994 and other aspects that they consider to have significant impact on nuclear safety. AECB based their conclusions on their observations, audits, inspections and review of information that Ontario Hydro submits to them as required by the station Operating Licences. 11 tabs., 8 figs

  12. Guide to the collection and presentation of electrical, electronic, and sensing component reliability data for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    This Guide is intended to establish a method of collecting and presenting reliability data for quantitative systematic reliability analysis in nuclear power generating stations, as outlined in IEEE Std 351-1975. Appendix D, which is not a part of IEEE Std 500-1977 but which comprises the bulk of this publication, presents tables of reliability data for nuclear power generating stations, intended for use of nuclear systems reliability analysts or design engineers

  13. Solid polymer electrolyte water electrolysis system development. [to generate oxygen for manned space station applications

    Science.gov (United States)

    1975-01-01

    Solid polymer electrolyte technology used in a water electrolysis system (WES) to generate oxygen and hydrogen for manned space station applications was investigated. A four-man rated, low pressure breadboard water electrolysis system with the necessary instrumentation and controls was fabricated and tested. A six man rated, high pressure, high temperature, advanced preprototype WES was developed. This configuration included the design and development of an advanced water electrolysis module, capable of operation at 400 psig and 200 F, and a dynamic phase separator/pump in place of a passive phase separator design. Evaluation of this system demonstrated the goal of safe, unattended automated operation at high pressure and high temperature with an accumulated gas generation time of over 1000 hours.

  14. Monitoring the risk of loss of heat sink during plant shutdowns at Bruce Generating Station 'A'

    International Nuclear Information System (INIS)

    Krishnan, K.S.; Mancuso, F.; Vecchiarelli, D.

    1996-01-01

    A relatively simple loss of shutdown heat sink fault tree model has been developed and used during unit outages at Bruce Nuclear Generation Station 'A' to assess, from a risk and reliability perspective, alternative heat sink strategies and to aid in decisions on allowable outage configurations. The model is adjusted to reflect the various unit configurations planned during a specific outage, and identifies events and event combinations leading to loss of fuel cooling. The calculated failure frequencies are compared to the limits consistent with corporate and international public safety goals. The importance measures generated by the interrogation of the fault tree model for each outage configuration are also used to reschedule configurations with high fuel damage frequency later into the outage and to control the configurations with relatively high probability of fuel damage to short intervals at the most appropriate time into the outage. (author)

  15. Niagara pumping generation station inundation mapping and consequence analysis with ArcGIS and Mike 21

    Energy Technology Data Exchange (ETDEWEB)

    Grover, Patrick; Khayer, Yasmin; Naumov, Aleksey [4DM Inc., Toronto, (Canada); Zhang, Yibing [Ontario Power Generation, Toronto, (Canada)

    2010-07-01

    Inundation mapping is a key factor of Ontario Power Generation's dam safety program. It is the basis for determining the hazard potential classification of the dam by modelling the consequences of a hypothetical dam failure. This paper presented the project for updating the inundation mapping and consequence analysis study at the Niagara Pump generating station (PGS) reservoir. A complete hydrotechnical assessment of the Niagara PGS reservoir was conducted. The modelling of various breach scenarios was carried out using the 2-D hydrodynamic software MIKE 21 in order to provide the hydraulic data necessary for producing the inundation maps. Updated EPRP maps were produced and a consequence analysis was performed which confirmed the existing hazard classification. The ArcGIS system was used as the underlying framework for all major components of the project. It was found that the use of GIS technologies improve the efficiency of both modelling and analysis.

  16. Methodology for characterizing the environmental impacts of hydroelectric generating stations : a case study of Farmer Rapids

    International Nuclear Information System (INIS)

    Lemieux, C.; Renaud, S.; Begin, P.; Belzile, L.; Caumartin, J.

    2006-01-01

    This paper described a novel methodology used to characterize the downstream section of a generating station that was not navigable by boat. The method was used as part of a fish habitat characterization study conducted in the Farmers Rapids area of Quebec. The purpose of the study was to identify the discharges and water levels needed to preserve fish habitats in the region. Initially, experimental fishing was undertaken to locate, validate and characterize fish habitats. Habitat models were then developed using a microhabitat modelling method to establish pertinent discharges and water levels. In order to model areas that were not navigable by boat, discharges released by the generating station were reduced to a minimum to temporarily decrease water levels and expose the river. High definition aerial photography and topographic mapping was conducted. The information obtained from the 2 procedures was then used to describe and map the riverbed substrate as well as the bathymetry and aquatic habitats. A 2D hydrodynamic model was then used to simulate water flows in the area at various discharges. The results of the hydrodynamic models and the habitat models were then used to establish appropriate discharges for optimal fish habitats

  17. IEEE recommended practices for seismic qualification of Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The IEEE has developed this document to provide direction for developing programs to seismically qualify Class 1E equipment for nuclear power generating stations. It supplements IEEE Std 323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, which describes the basic requirements for equipment qualification. The Class 1E equipment to be qualified by produres or standards established by this document are of many forms, characteristics, and materials; therefore, the document presents many acceptable methods with the intent of permitting the user to make a judicious selection from among the various options. In making such a selection, the user should choose those that best meet a particular equipment's requirements. Further, in using this document as a specification for the purchase of equipment, the many options should also be recognized and the document invoked accordingly. It is recommended that the need for specific standards for the seismic qualifiction of particular kinds of equipment be evaluated by those responsible for such documents and that consideration be given to the application of particular methods from these documents which are most suitable

  18. The structural aging assessment program: ranking methodology for CANDU nuclear generating station concrete components

    International Nuclear Information System (INIS)

    Philipose, K.E.; Muhkerjee, P.K.; McColm, E.J.

    1997-01-01

    Most of the major structural components in CANDU nuclear generating stations are constructed of reinforced concrete. Although passive in nature, these structures perform many critical safety functions in the operation of each facility. Aging can affect the structural capacity and integrity of structures. The reduction in capacity due to aging is not addressed in design codes. Thus a program is warranted to monitor the aging of safety-related CANDU plant structures and to prioritize those that require maintenance and repairs. Prioritization of monitoring efforts is best accomplished by focusing on those structures judged to be the most critical to plant performance and safety. The safety significance of each sub-element and its degradation with time can be evaluated using a numerical rating system. This will simplify the utility's efforts, thereby saving maintenance costs while providing a higher degree of assurance that performance is maintained. This paper describes the development of a rating system (ranking procedure) as part of the Plant Life Management of CANDU generating station concrete structures and illustrates its application to an operating plant. (author)

  19. Qualifying commercial grade instruments for use in nuclear power generating stations

    International Nuclear Information System (INIS)

    Lamothe, R.J.; Scally, C.R.

    1983-01-01

    Nuclear environmental qualification of instrumentation has been successfully accomplished by many commercial grade equipment manufacturers. This paper was prepared as a guide to those manufacturers who want some insight into a qualification program. The areas addressed are the regulations and documents, the qualification program, and a case history of a chart recorder qualifications. The principal standards relating to a nuclear qualification program are IEEE Std. 323-1974 IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, IEEE Std. 344-1975 IEEE Recommended Practices for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations and 10CFR50.49. Previously NUREG 0588 Interim Staff Position on Environmental Qualification of Safety-Related Equipment. These define the intent and purpose of the qualification. The qualification program itself consists of several distinct parts which require explanation, including the determination of qualified life, choice of test samples, selection of appropriate acceptance criteria, aging program, radiation testing, seismic testing, abnormal environment tests and others. The case history illustrates the qualification program and the thought processes involved

  20. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  1. Radon in dwellings the national radon survey Clare, Limerick and Tipperary

    International Nuclear Information System (INIS)

    McGarry, A.T.; Fennell, S.G.; Mackin, G.M.; Madden, J.S.; O'Colmain, M.

    1998-12-01

    This report presents the results of the fourth phase of the National Radon Survey carried out by the Radiological Protection Institute of Ireland. The counties included in this phase are Clare, Limerick and Tipperary. The average radon concentrations for the houses measured in these counties were 88 Bq/m 3 , 77 Bq/m 3 and 79 Bq/m 3 . The measurement data were grouped on the basis of the 10 km grid squares of the Irish National Grid System and used to predict the percentage of dwellings in each grid square which exceeds the Reference Level of 200 Bq/m 3 . Grid squares where this percentage is predicted to be 10% or higher are designated High Radon Areas. The health effects of exposure to high radon levels are discussed and recommendations are made regarding both new and existing dwellings. (author)

  2. IEEE standard criteria for type tests of class 1E modules used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    The Institute of Electrical and Electronics Engineers has generated this document to provide direction for type testing Class 1E modules and obtaining specific type test data. It supplements IEEE Std 323-1974, Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, which describes the basic requirements for Class 1E equipment qualification. Adherence to this document alone may not suffice for assuring public health and safety because it is the integrated performance of the structures, the fluid systems, the electrical systems, the instrumentation systems of the station, and in particular, the plant protection system of which these modules are a part that prevents accidents or limits the consequences of accidents. Each applicant to the Nuclear Regulatory Commission for a license to operate a nuclear power generating station has the responsibility to assure himself and others that this document, if used, is pertinent to his application and that the integrated performance of his station is adequate

  3. Corbally House Nursing Home, Mill Road, Corbally, Limerick.

    LENUS (Irish Health Repository)

    Sermeus, Walter

    2011-04-18

    changing different aspects of the nursing work environment on quality of care and satisfaction of the nursing workforce. Discussion RN4CAST is one of the largest nurse workforce studies ever conducted in Europe, will add to accuracy of forecasting models and generate new approaches to more effective management of nursing resources in Europe.

  4. Effect of Electromagnetic Waves Generated by Base Transiver Station on Liver Enzymes in Female Rats

    Directory of Open Access Journals (Sweden)

    Gholam-Ali Jelodar

    2013-07-01

    Full Text Available Background: This study was investigating the effect of electromagnetic wave generated by mobile and base transceiver station (900 MHz on liver enzymes in both mature and immature female age.Materials and Methods: In this study, 20 rats Sprague Dawley white mature female age 8 to 9 weeks and weight 180 to 200 g and 20 rats immature age 3 to 4 weeks, weight 80 to 100 g, each age group were randomly divided in two groups (control and test. Test groups, were daily for four hours and four different times exposed to electromagnetic waves with signal generator (900 MHz, 5-meter intervals. Control groups were kept at equal condition (themperature and light in laboratory during experiment. After at the end experimental period, blood was collected by heart puncture of all animal. Exposure to EMF generated by BTS had significant effect on liver enzymes composition in mature and immature rats.Results: AST, ALT and ALP in immature-test groups decreased significantly compared with their respective control groups (p<0.05. ALP in mature-test groups increased significantly compared with their respective control groups (p<0.05.Conclusion: These result suggest that exposure to EMF generated by BTS has a deleterious effect on liver enzymes and that this effect is more sever in immature animals.

  5. Purification and solidification of reactor wastes at a Canadian nuclear generating station

    International Nuclear Information System (INIS)

    Buckley, L.P.; Burt, D.A.

    1981-06-01

    Chalk River Nuclear Laboratories are developing methods to condition power reactor wastes and to immobilize their radionuclides. Evaporation alone and combined with bituminization has been an important part of the program. After testing at the laboratories a 0.5 m 2 wiped-film evaporator was sent to the Douglas Point Nuclear Generating Station (220 MWe) to demonstrate its suitability to handle typical reactor liquid wastes. Two specific tasks undertaken with the wiped-film evaporator were successfully completed. The first was purification of contaminated heavy water which had leaked from the moderator circuit. The heavy water is normally recovered, cleaned by filters and ion-exchange resin and then upgraded by electrolysis. Cleaning the heavy water with the wiped-film evaporator produced better quality water for upgrading than had been achieved by any previous method and at much lower operating cost. The second task was to concentrate and immobilize a decontamination waste. The waste was generated from the decontamination of pump bowls used in the primary heat transport circuit. The simultaneous addition of the liquid waste and bitumen emulsion to the wiped-film evaporator produced a solid containing 30 wt% waste solids in a bitumen matrix. The volume reduction achieved was 16:1 based on the volumes of initial liquid waste and the final product generated. The quantity sent to storage was 20 times less than had the waste been immobilized in a cement matrix. The successful demonstration has resulted in a proposal to install a wiped-film evaporator at the station to clean heavy water and immobilize decontamination wastes. (author)

  6. Emergency operating instruction improvements at San Onofre Nuclear Generating Station Units 2 and 3

    International Nuclear Information System (INIS)

    Trillo, M.W.; Smith, B.H.

    1989-01-01

    In late 1987, San Onofre nuclear generating station (SONGS) began an extensive upgrade of the units 2 and 3 emergency operating instructions (EOIs). The original intent of this program was to incorporate revised generic guidance and to correct problems that were identified by operators. While this program was in progress, the US Nuclear Regulatory Commission (NRC) conducted a series of audits of emergency operating procedure (EOP) development and maintenance programs as 16 commercial nuclear facilities in the United States. These audits included four stations with Combustion Engineering-designed nuclear steam supply systems. (One of these audits included a review of preupgrade SONGS units 2 and 3 EOIs.) Significant industrywide comments resulted from these audits. The NRC has stated its intent to continue the review and audit of EOIs and the associated maintenance programs at all US commercial nuclear facilities. The units 2 and 3 EOI upgrade program developed procedural improvements and procedural program maintenance improvements that address many of the existing audit comments that have been received by the industry. Other resulting improvements may be useful in minimizing NRC comments in future such audits. Specific improvements are discussed. The upgrade program resulted in benefits that were not originally anticipated. The results of this program can be of significant use by other utilities in addressing the industrywide concerns that have been raised in recent NRC audits of EOP development and maintenance programs

  7. Role of quality circles in dose control programs at Kaiga generating station

    International Nuclear Information System (INIS)

    Varadhan, R.S.; Sukumar, T.S.; Ramamurthy, K.; Nageswara Rao, G.

    2003-01-01

    To operate the nuclear power station with maximum capacity factors and lowest collective dose it is imperative that a sense of belongingness among the employees is essential. Quality Circles provide an opportunity to the plant personnel irrespective of their grade or discipline to come together to solve the work related problems in a scientific manner to enhance the productivity and safety in the work environment. The concept of Quality Circles came to Kaiga during July 1998. The thought revolution grew slowly and steadily and brought big gains to the station. The organized thoughts and concerted actions in field resulted in development of good work culture among the employees, an important input to achieve super excellence in power generation in the most cost effective manner. This also is a means to set challenging targets and make and break the records among the NPCIL units. The genesis of Quality Circles, the methodology of QC working, promotional activities, the progress and programs of Quality Circles are discussed in this presentation. (author)

  8. Plant habitability assessment for Point Lepreau Generating Station during a severe accident resulting from station blackout conditions

    International Nuclear Information System (INIS)

    Mullin, D.

    2015-01-01

    In response to the CNSC Fukushima Action Plan, the CANDU Owners Group (COG) developed a methodology for assessing nuclear power plant habitability under Joint Project 4426 and to determine if any improvement actions are necessary to provide a high degree of assurance that a severe accident can be managed from a human and organizational performance perspective. NB Power has applied the methodology considering a station black-out scenario (representative case), and assessed the effects of non-radiological hazards and radiological hazards in the context of operator dose relative to emergency dose limits. The paper will discuss the overall methodology, findings and recommendations. (author)

  9. Plant habitability assessment for Point Lepreau Generating Station during a severe accident resulting from station blackout conditions

    Energy Technology Data Exchange (ETDEWEB)

    Mullin, D., E-mail: dmullin@nbpower.com [New Brunswick Power Corporation, Point Lepreau Generating Station, Lepreau, NB (Canada)

    2015-07-01

    In response to the CNSC Fukushima Action Plan, the CANDU Owners Group (COG) developed a methodology for assessing nuclear power plant habitability under Joint Project 4426 and to determine if any improvement actions are necessary to provide a high degree of assurance that a severe accident can be managed from a human and organizational performance perspective. NB Power has applied the methodology considering a station black-out scenario (representative case), and assessed the effects of non-radiological hazards and radiological hazards in the context of operator dose relative to emergency dose limits. The paper will discuss the overall methodology, findings and recommendations. (author)

  10. Thermal mapping studies at Kadra reservoir near Kaiga generating station site

    International Nuclear Information System (INIS)

    Ravi, P.M.; Nayak, P.D.; Sudhakar, J.; Mishra, D.G.; Hegde, A.G.

    2007-01-01

    An inherent problem in nuclear and thermal power plants are the release of heat energy into the environment through cooling system to water bodies such as lakes, rivers, estuaries and oceans. Two NPPs of Kaiga Generating Station, discharge the thermal effluent to the nearby Kadra reservoir. This paper presents the results of three year long comprehensive thermal mapping studies conducted by ESL, KGS as part of the Thermal Ecological Studies sponsored by Board of Research in Nuclear Sciences (BRNS), Department of Atomic Energy. Present studies clearly demonstrate that the thermally influenced zone in the reservoir is limited to a small volume of the reservoir and is not likely to lead any irreversible adverse impact on the ecosystem of the reservoir. (author)

  11. Radioactive emission data from Canadian nuclear generating stations 1986 to 1995

    International Nuclear Information System (INIS)

    1997-05-01

    All nuclear generating station (NGSs) release small quantities of radioactivity in a controlled manner into both the atmosphere (as gaseous effluents) and adjoining water bodies (as liquid effluents). The purpose of this document is to report on the magnitude of these emissions for each operating NGS in Canada and to indicate how these emissions compare with the relevant limitations imposed by the AECB as part of its regulatory and licensing program. The data show that the levels of emissions of gaseous and liquid effluents from all currently operating NGSs are well below the values mandated by the AECB. In fact, since 1987 no emissions have exceeded 1% of those values. 3 tabs., 46 figs

  12. Decontamination and disposal of Sb-124 at Palo Verde Nuclear Generating Station

    International Nuclear Information System (INIS)

    Miller, A.D.; Hillmer, T.P.; Kester, J.W.; Hensch, J.R.

    1988-01-01

    Palo Verde Nuclear Generating Station (PVNGS) is a three unit Combustion Engineering pressurized water reactor site. Each unit consists of an identical, self contained 1270 MWe reactor. This standardized design allows sharing of design improvements and equipment leading to optimum operation of the individual units. One design improvement, identified early into the operation of Unit 1, involved the elemental antimony content of the seals and bearings within the reactor coolant pumps. Normal wear of these components releases small amounts of elemental antimony. This antimony in turn deposits on in-core surfaces and activates to produce the isotopes Sb-122 and Sb-124. These isotopes emit highly energetic gamma rays which contribute significantly to the exposure and radwaste disposal charges at PVNGS. For these reasons, the Antimony Removal Program was undertaken to remove the radioactive and elemental antimony from the nuclear steam supply system at all three units. The work presented here describes the antimony decontamination and disposal

  13. Risk impact of planned maintenance configuration at South Texas Project Electric Generating Station

    International Nuclear Information System (INIS)

    Loh, W.T.; Fleming, K.N.; Grantom, C.R.

    2004-01-01

    This paper is based on a study done for the Houston Lighting and Power Company. The purpose of this study is to estimate the risk impact of planned maintenance configurations at South Texas Project Electric Generating Station (STPEGS). To date, the focus of the STP probabilistic safety assessment (PSA) program has been to analyze risk in terms of estimates of accident frequencies that are expressed on a time-averaged basis. Thus, estimates of quantities such as severe core damage frequency have been made such that the temporal variations of this frequency with changing plant configurations are averaged out over time. The only condition that has been imposed on these estimates is that the plant is initially operating at full power when potential initiating events might occur. (author)

  14. A novel feedwater system for the RETRAN model of the Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Secker, P.A.; Webb, J.R.

    1988-01-01

    This paper presents a feedwater system model which supplies realistic boundary conditions to the RETRAN model of a Palo Verde Nuclear Generating Station reactor plant. The RETRAN thermal hydraulic code is used to analyze nuclear reactor system transients through a generalized thermal hydraulic volume/junction network. The feedwater system model is implemented using the control block modeling option available in the RETRAN code. The output of the control block model is coupled to the thermal hydraulic network by a fill junction. A forward Euler integration scheme is used by RETRAN for control block variables. The feedwater system model is formulated to allow implicit integration within the existing code framework. The potential need for small integration time steps is, therefore, alleviated. The model results are compared with test data

  15. Experience with reactor power cutback system at Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Chari, D.R.; Rec, J.R.; Simoni, L.P.; Eimar, R.L.; Sowers, G.W.

    1987-01-01

    Palo Verde Nuclear Generating Station (PVNGS) is a three unit site which illustrates System 80 nuclear steam supply system (NSSS) design. The System 80 NSSS is the Combustion Engineering (C-E) standard design rated at 3817 Mwth. PVNGS Units 1 and 2 achieved commercial operation on February 13, 1986 and September 22, 1986, respectively, while Unit 3 has a forecast date for commercial operation in the third quarter of 1987. The System 80 design incorporates a reactor power cutback system (RPCS) feature which reduces plant trips caused by two common initiating events: loss of load/turbine trip (LOL) and loss of one main feedwater pump (LOMFWP). The key design objective of the RPCS is to improve overall plant availability and performance, while minimizing challenges to the plant safety system

  16. Radiological Effluent Technical Specifications (RETS) implementation: Zion Generating Station Units 1 and 2

    International Nuclear Information System (INIS)

    Serrano, W.; Akers, D.W.; Duce, S.W.; Mandler, J.W.; Simpson, F.B.; Young, T.E.

    1985-06-01

    A review of the Radiological Effluent Technical Specifications (RETS) of the Zion Generating Station Units 1 and 2 was performed. The principal review guidelines used were NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants,'' and Draft 7 of NUREG-0472, Revision 3, ''Radiological Effluent Technical Specifications for Pressurized Water Reactors.'' Draft submittals were discussed with the Licensee by both EG and G and the NRC staff until all items requiring changes to the Technical Specifications were resolved. The Licensee then submitted final proposed RETS to the NRC which were evaluated and found to be in compliance with the NRC review guidelines. The proposed Offsite Dose Calculation Manual was reviewed and generally found to be consistent with the NRC review guidelines. 35 refs., 2 figs., 1 tab

  17. A multi state simulation model of the maintenance for a power generating station

    International Nuclear Information System (INIS)

    Karlsson, B.O.

    1980-09-01

    A multistate simulation model for a thermal power generating station is described. The performance is modelled as a function of the system structure, the component reliability, the number of repair crews, the repair times and the availability of spare parts. Each component can be in either of four states: failed, working, postponed, or standby. A component will be in the postponed state, if due to failures in other components it is turned off. Two different types of failures are assumed: minor and severe. Evaluation of the system state is performed by repeated use of four elementary system functions: series, parallel, k-out-of-n, and standby k/l/n. Numerical results for a case study are presented. (author)

  18. Recent experience related to neutronic transients in Ontario Hydro CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Frescura, G.M.; Smith, A.J.; Lau, J.H.

    1991-01-01

    Ontario Hydro presently operates 18 CANDU reactors in the province of Ontario, Canada. All of these reactors are of the CANDU Pressurized Heavy Water design, although their design features differ somewhat reflecting the evolution that has taken place from 1971 when the first Pickering unit started operation to the present as the Darlington units are being placed in service. Over the last three years, two significant neutronic transients took place at the Pickering Nuclear Generating Station 'A' (NGS A) one of which resulted in a number of fuel failures. Both events provided valuable lessons in the areas of operational safety, fuel performance And accident analysis. The events and the lessons learned are discussed in this paper

  19. Manufacture of steam generator units and components for the AGR power stations at Heysham II and Torness

    Energy Technology Data Exchange (ETDEWEB)

    Glasgow, J R; Parkin, K [N.E.I. Nuclear Systems Ltd., Gateshead, Tyne and Wear (United Kingdom)

    1984-07-01

    The current AGR Steam Generator is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley B/Hunterston B AGR power stations. In this paper a brief outline of the evolution of the steam generator design from the earlier gas cooled reactor stations is presented. A description of the main items of fabrication development is given. The production facilities for the manufacture of the units are described. Reference is also made to some of the work on associated components. The early experience on the construction site of installation of the steam generators is briefly outlined. (author)

  20. Manufacture of steam generator units and components for the AGR power stations at Heysham II and Torness

    International Nuclear Information System (INIS)

    Glasgow, J.R.; Parkin, K.

    1984-01-01

    The current AGR Steam Generator is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley B/Hunterston B AGR power stations. In this paper a brief outline of the evolution of the steam generator design from the earlier gas cooled reactor stations is presented. A description of the main items of fabrication development is given. The production facilities for the manufacture of the units are described. Reference is also made to some of the work on associated components. The early experience on the construction site of installation of the steam generators is briefly outlined. (author)

  1. 33 CFR 165.553 - Security Zone; Salem and Hope Creek Generation Stations, Delaware River, Salem County, New Jersey.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Security Zone; Salem and Hope... Limited Access Areas Fifth Coast Guard District § 165.553 Security Zone; Salem and Hope Creek Generation...: the waters of the Delaware River in the vicinity of the Salem and Hope Creek Generation Stations...

  2. Reconstruction of steam generators super emergency feadwater supply system (SHNC) and steam dump stations to the atmosphere system PSA

    International Nuclear Information System (INIS)

    Kuzma, J.

    2001-01-01

    Steam Generators Super Emergency Feadwater Supply System (SHNC) and Steam Dump Stations to the Atmosphere System (PSA) are two systems which cooperate to remove residual heat from reactor core after seismic event. SHNC assure feeding of the secondary site of steam generator (Feed) where after heat removal.from primary loops, is relieved to the atmosphere by PSA (Bleed) in form of steam. (author)

  3. Duke Power Company - McGuire Nuclear Station: steam-generator hideout return and cleanup

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    McGuire Nuclear Station steam generator hideout return and cleanup are discussed. Hideout return data are presented for Unit 1 shutdowns that occurred on November 23, 1984, and April 19, 1985, and a Unit 2 shutdown on January 25, 1985. The data are presented as the concentrations of various species as a function of time after power reduction and primary water temperature. The steam generator blowdown as a function of time after power reduction is also presented. The concentrations of sodium, potassium, calcium, magnesium, aluminum, iron, and copper cations, and chloride, fluoride, sulfate, phosphate and nitrite anions were monitored during the each shutdown. Silica was also measured in the two 1985 shutdowns. The return of sulfate, phosphate, calcium and magnesium showed retrograde solubility. Silica concentrations showed an increase as the temperature decreased to about 450 to 500 0 F and then they decreased as the temperature decreased. McGuire has a holf point at 300 at 350 0 F to clean up the steam generator secondary water. The return of sulfates should occur within 4 to 6 hours. The blowdown is maximized to reduce the secondary water impurity concentrations. Cleanup continues until the sulfate concentration is reduced to below 100 ppb. At that point cooldown is continued

  4. Comparative study of the hydrogen generation during short term station blackout (STSBO) in a BWR

    International Nuclear Information System (INIS)

    Polo-Labarrios, M.A.; Espinosa-Paredes, G.

    2015-01-01

    Highlights: • Comparative study of generation in a simulated STSBO severe accident. • MELCOR and SCDAP/RELAP5 codes were used to understanding the main phenomena. • Both codes present similar thermal-hydraulic behavior for pressure and boil off. • SCDAP/RELAP5 predicts 15.8% lower hydrogen production than MELCOR. - Abstract: The aim of this work is the comparative study of hydrogen generation and the associated parameters in a simulated severe accident of a short-term station blackout (STSBO) in a typical BWR-5 with Mark-II containment. MELCOR (v.1.8.6) and SCDAP/RELAP5 (Mod.3.4) codes were used to understand the main phenomena in the STSBO event through the results comparison obtained from simulations with these codes. Due that the simulation scope of SCDAP/RELAP5 is limited to failure of the vessel pressure boundary, the comparison was focused on in-vessel severe accident phenomena; with a special interest in the vessel pressure, boil of cooling, core temperature, and hydrogen generation. The results show that at the beginning of the scenario, both codes present similar thermal-hydraulic behavior for pressure and boil off of cooling, but during the relocation, the pressure and boil off, present differences in timing and order of magnitude. Both codes predict in similar time the beginning of melting material drop to the lower head. As far as the hydrogen production rate, SCDAP/RELAP5 predicts 15.8% lower production than MELCOR

  5. Environmental radiological studies downstream from Rancho Seco Nuclear Power Generating Station

    International Nuclear Information System (INIS)

    Noshkin, V.E.; Wong, K.M.; Eagle, R.J.; Dawson, J.W.; Brunk, J.L.; Jokela, T.A.

    1985-01-01

    This report summarizes the information compiled in 1984 while assessing the environmental impact of radionuclides in aquatic releases from the Rancho Seco Nuclear Power Generating Station. Gamma-emitting radionuclides discharged since 1981 are found in many of the dietary components derived from the creeks receiving the effluent wastewater. Some soils and crops are found to contain radionuclides that originate from the contaminated water that was transferred to land during the irrigation season. 134 Cs and 137 Cs are the primary gamma-emitting radionuclides detected in the edible flesh of fish from the creeks. Concentrations in the flesh of fish decreased exponentially with distance from the plant. No significant differences in the 137 Cs activity were found between male and female fish of equal size, but concentrations may vary in fish of different size, with the season and diet. 21% of the total 137 Cs and 134 Cs discharged between 1981 and 1984 is associated with the creek sediments to a distance of 27 km from the plant. Fractions of the missing inventory have been transferred to land during the irrigation season or to downstream regions more distant than 27 km from the plant. The radiocesium content of the sediments in 1984 decreased significantly in a downstream direction, much in the same manner as concentrations decreased in fish. Radioactivity originating from the plant was not above detection limits in any terrestrial food item sampled beyond 6.5 km from the plant. Based on the usage factors provided by individuals interviewed in a 1984 survey, the fish and aquatic-organism ingestion pathway contributed the largest radiological dose to humans utilizing products contaminated with the radionuclides in the liquid wastes discharged from the Rancho Seco Nuclear Power Generating Station in 1984

  6. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    This report is the Atomic Energy Control Board (AECB) staff assessment of safety at the Pickering Nuclear Generating Station (PNGS-A and PNGS-B) for 1995. Our on-site Project Officers and Ottawa-based specialists monitored the stations throughout the year. In 1995, compliance with the Transportation Packaging of Radioactive Materials Regulations and the Cost Recovery Fees Regulations was satisfactory. The performance of the special safety systems was good. Releases of radioactive materials from the station were low and well below the legal limits for public safety. 10 tabs., 7 figs

  7. Field testing of a 1,300MVA turbine generator for the Oi nuclear-power station

    International Nuclear Information System (INIS)

    Inoue, Toshiaki; Tajiri, Yoshiaki; Ito, Hiroyuki; Fukuda, Mitsuo.

    1980-01-01

    The first Mitsubishi 1,300MVA turbine generator for this power station was put into commercial operation in March 1979, and the second unit in December of that year. The turbine generators use new technology in a variety of areas, including the cooling system, to achieve great increases in capacity over previously designed generators, and are destined to become the worldwide standard for large-scale generators of this type. Valuable experience was gained in the installation and testing of the generators. The outline of the tests performed on the generators with respect to heating and vibration are described in the article. (author)

  8. Data communications method for mobile network in fourth generation communications system, involves delivering decoded data to mobile station from relay station, where mobile station receives data from both relay and base stations

    DEFF Research Database (Denmark)

    2008-01-01

    The method involves utilizing a base station (BS) (100) to transmit data to a relay station (RS) (110) and a mobile station (MS) (120), where the data includes two messages. The BS is utilized to transmit the two messages by utilizing a linear combination method, and the data is received in the RS...

  9. Electric utilities deregulation and its impact on nuclear power generating stations

    International Nuclear Information System (INIS)

    Trehan, N.K.

    1998-01-01

    Under restructuring and deregulation, it is not clear as to who would have the responsibility, and what obligations the market participants would have to ensure that the electrical system reliability (stability) is maintained. Due to the dynamic nature of the electrical grid, especially with the implementation of restructuring and deregulation, vulnerabilities exist which may impact the reliability (stability) of the offsite electrical power system. In a nuclear power generating unit, an offsite electric power system and an onsite electric power system are required to permit the functioning of structures, systems, and components which are important to safety. The safety function for each system is to provide sufficient capacity and capability to assure that the containment integrity is maintained during power operation or in the event of a postulated accident. Analyses performed by the applicants must verify that the electrical grid remains stable in the event of a loss of the nuclear unit generator, the largest other unit on the grid or the most critical transmission line. The stability of the electric grid is assumed in the safety analyses and a change in it would impact those analyses. However, it may impact the availability of a stable electric power to the safety buses because of the limited number of available transmission lines. This paper discusses electrical power generation and demand, reserve margins, power transfer capability, development of new innovative technologies to compensate for lack of the construction of transmission lines, legislation for the formulation of a self regulation organization (SRO), grid disturbances that may lead to a voltage collapse, and the vulnerabilities which may impact the availability of a stable power to the nuclear power generating stations

  10. 78 FR 77726 - Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1

    Science.gov (United States)

    2013-12-24

    ... Three Mile Island Nuclear Station, Unit 1 AGENCY: Nuclear Regulatory Commission. ACTION: Exemption... License No. DPR-50, which authorizes operation of the Three Mile Island Nuclear Station, Unit 1 (TMI-1... Facility Operating License No. DPR-50, which authorizes operation of the Three Mile Island Nuclear Station...

  11. 75 FR 36700 - Exelon Generation Company, LLC; Three Mile Island Nuclear Station, Unit 1; Environmental...

    Science.gov (United States)

    2010-06-28

    ...; Three Mile Island Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact... Company, LLC (the licensee), for operation of Three Mile Island Nuclear Station, Unit 1 (TMI-1), located... Three Mile Island Nuclear Station, Units 1 and 2, NUREG-0552, dated December 1972, and Generic...

  12. Use of intelligent loop diagrams at San Onofre Nuclear Generation Station (SONGS)

    International Nuclear Information System (INIS)

    Groves, J.E.; Johnson, K.I.; Foulk, J.; Reinschmidt, K.F.; Tutos, N.C.

    1991-01-01

    The use of advanced information systems will result in five million dollars potential cost reduction and two years less time for producing over 2000 Instrumentation and Control Loop Diagrams for the three nuclear units at San Onofre Nuclear Generating Station (SONGS). This new information technology will also assist plant management at SONGS in generating even larger savings from reduction in operations and maintenance costs. The key element of the new solution is the use of plant drawings, the traditional primary source of plant information, for on-line access to all plant databases and information systems, by replacing paper drawings with intelligent electronic drawings. The implementation of this concept for the Instrumentation and Control Loop Diagrams, presently in progress, is part of the Integrated Nuclear Data Management Systems (INDAMS) program at SONGS, a joint effort which includes support from Stone and Webster Advanced Systems Development Services, International Business Machines Corporation (IBM), and Dassault Systems of France. The initial results have encouraged plant management to speed up the implementation process

  13. The vibrational behaviour of the generator support structure for Koeberg nuclear power station at high frequencies

    International Nuclear Information System (INIS)

    Lee, D.E.

    1988-06-01

    The vibrational behaviour of the generator support structure at Koeberg nuclear power station at frequencies primarily in the region of 80 Hz to 110 Hz was examined. The effect of soil-structure interaction and the change in stiffness of the foundation soil was investigated. Vibration tests were performed on the generator support structure and the results were compared with a theoretical finite element analysis of the structure. By varying the soil-cement foundation stiffness it was possible to demonstrate the change in dynamic behaviour of the structure in the higher frequency band 80 Hz to 110 Hz. Comment has been made on the design code DIN 4024 in view of the findings of this thesis. It was concluded that the empirical rules regarding the inclusion of the foundation in an analysis specified by the code do not cover all cases and greater cognisance of the effect of the foundation stiffness on the vibration behaviour of such machine foundations is necessary. Obvious machine frequencies higher than the operational frequencies should be analysed where it is considered necessary. 24 refs., 25 tabs., 83 figs

  14. Development of the Next Generation Gas Trap for the Space Station Internal Thermal Control System

    Science.gov (United States)

    Leimkuehler, Thomas O.; Spelbring, Chris; Reeves, Daniel R.; Holt, James M.

    2003-01-01

    The current dual-membrane gas trap is designed to remove non-condensed gases (NCG) from the Internal Thermal Control System (ITCS) coolant on board the International Space Station (ISS). To date it has successfully served its purpose of preventing depriming, overspeed, and shutdown of the ITCS pump. However, contamination in the ITCS coolant has adversely affected the gas venting rate and lifetime of the gas trap, warranting a development effort for a next-generation gas trap. Design goals are to meet or exceed the current requirements to (1) include greater operating ranges and conditions, (2) eliminate reliance on the current hydrophilic tube fabrication process, and (3) increase operational life and tolerance to particulate and microbial growth fouling. In addition, the next generation gas trap will essentially be a 'dropin" design such that no modifications to the ITCS pump package assembly (PPA) will be required, and the implementation of the new design will not affect changes to the ITCS operational conditions, interfaces, or software. This paper will present the initial membrane module design and development work which has included (1) a trade study among several conceptual designs, (2) performance modeling of a hydrophobic-only design, and (3) small-scale development test data for the hydrophobic-only design. Testing has shown that the hydrophobic-only design is capable of performing even better than the current dual-membrane design for both steady-state gas removal and gas slug removal.

  15. A recommended approach for calculating degraded voltage relay setpoints for nuclear generating stations

    International Nuclear Information System (INIS)

    Jancauskas, J.R.

    1994-01-01

    The purpose of degrading voltage relays (DVRs) is to ensure that adequate voltage is available to operate all Class 1E loads at all voltage distribution levels. Should voltage drop below the setpoint of the DVRs, the Class 1E power system is disconnected from its supply and resequenced onto the diesel generators in order to restore system voltages to acceptable levels. These relays represent one of the two levels of voltage protection required for the onsite power system. Determining the proper setpoint for degraded voltage relays in nuclear generating stations is a complex task which requires a complete understanding of the Class 1E power distribution system. Despite the importance of degraded voltage relay setpoint calculations, most of the available references only give clues on how not to set these relays rather than provide guidance on how to determine the appropriate setpoint. This paper presents an approach for performing these calculations which attempts to ensure that all of the relevant design issues are addressed

  16. Measurements of tritium (HTO, TFWT, OBT) in environmental samples at varying distances from a nuclear generating station

    International Nuclear Information System (INIS)

    Kotzer, T.G.; Workman, W.J.G.

    1999-12-01

    Concentrations of tritium have been measured in environmental samples (vegetation, water, soil, air) from sites distal and proximal to a CANDU nuclear generating station in Southern Ontario (OPG-Pickering). Levels of tissue-free water tritium (TFWT) and organically bound tritium (OBT) in vegetation are as high as 24,000 TU immediately adjacent to the nuclear generating station and rapidly decrease to levels of tritium which are comparable to natural ambient concentrations for tritium in the environment (approximately ≤ 60 TU). Tritium concentrations (OBT, TFTW) have also been measured in samples of vegetation and tree rings growing substantial distances away from nuclear generating stations and are within a factor of 1 to 2 of the ambient levels of tritium measured in precipitation in several parts of Canada (approximately ≤30 TU). (author)

  17. Measurements of tritium (HTO, TFWT, OBT) in environmental samples at varying distances from a nuclear generating station

    Energy Technology Data Exchange (ETDEWEB)

    Kotzer, T.G.; Workman, W.J.G

    1999-12-01

    Concentrations of tritium have been measured in environmental samples (vegetation, water, soil, air) from sites distal and proximal to a CANDU nuclear generating station in Southern Ontario (OPG-Pickering). Levels of tissue-free water tritium (TFWT) and organically bound tritium (OBT) in vegetation are as high as 24,000 TU immediately adjacent to the nuclear generating station and rapidly decrease to levels of tritium which are comparable to natural ambient concentrations for tritium in the environment (approximately {<=} 60 TU). Tritium concentrations (OBT, TFTW) have also been measured in samples of vegetation and tree rings growing substantial distances away from nuclear generating stations and are within a factor of 1 to 2 of the ambient levels of tritium measured in precipitation in several parts of Canada (approximately {<=}30 TU). (author)

  18. S.I. 1987 No. 2182, The Electricity Generating Stations and Overhead Lines (Inquiries Procedure) Rules 1987

    International Nuclear Information System (INIS)

    1987-01-01

    These Rules, which came into force on 14 January 1988, make new provision for the procedure for any public inquiry held pursuant to Section 34 of the Electricity Act 1957 in relation to applications for consent to construct or extend a generating station (including nuclear stations). The Rules were made pursuant to Section 11 of the Tribunals and Inquiries Act 1971. They revoke the previous Electricity Generating Stations and Overhead Line (Inquiries Procedures) Rules 1981. These new Rules cover the same topics as the previous Rules but aim to shorten the potential length and thus cost of inquiries. They will apply to the Inquiry to be held into the application by the Central Electricity Generating Board to build a pressurised water reactor at Hinkley Point in Somerset. (NEA) [fr

  19. IEEE standard requirements for reliability analysis in the design and operation of safety systems for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The purpose of this standard is to provide uniform, minimum acceptable requirements for the performance of reliability analyses for safety-related systems found in nuclear-power generating stations, but not to define the need for an analysis. The need for reliability analysis has been identified in other standards which expand the requirements of regulations (e.g., IEEE Std 379-1972 (ANSI N41.2-1972), ''Guide for the Application of the Single-Failure Criterion to Nuclear Power Generating Station Protection System,'' which describes the application of the single-failure criterion). IEEE Std 352-1975, ''Guide for General Principles of Reliability Analysis of Nuclear Power Generating Station Protection Systems,'' provides guidance in the application and use of reliability techniques referred to in this standard

  20. Evaluation of steam generator U-tube integrity during PWR station blackout with secondary system depressurization

    International Nuclear Information System (INIS)

    Hidaka, Akihide; Asaka, Hideaki; Sugimoto, Jun; Ueno, Shingo; Yoshino, Takehito

    1999-12-01

    In PWR severe accidents such as station blackout, the integrity of steam generator U-tube would be threatened early at the transient among the pipes of primary system. This is due to the hot leg countercurrent natural circulation (CCNC) flow which delivers the decay heat of the core to the structures of primary system if the core temperature increases after the secondary system depressurization. From a view point of accident mitigation, this steam generator tube rupture (SGTR) is not preferable because it results in the direct release of primary coolant including fission products (FP) to the environment. Recent SCDAP/RELAP5 analyses by USNRC showed that the creep failure of pressurizer surge line which results in release of the coolant into containment would occur earlier than SGTR during the secondary system depressurization. However, the analyses did not consider the decay heat from deposited FP on the steam generator U-tube surface. In order to investigate the effect of decay heat on the steam generator U-tube integrity, the hot leg CCNC flow model used in the USNRC's calculation was, at first, validated through the analysis for JAERI's LSTF experiment. The CCNC model reproduced well the thermohydraulics observed in the LSTF experiment and thus the model is mostly reliable. An analytical study was then performed with SCDAP/RELAP5 for TMLB' sequence of Surry plant with and without secondary system depressurization. The decay heat from deposited FP was calculated by JAERI's FP aerosol behavior analysis code, ART. The ART analysis showed that relatively large amount of FPs may deposit on steam generator U-tube inlet mainly by thermophoresis. The SCDAP/RELAP5 analyses considering the FP decay heat predicted small safety margin for steam generator U-tube integrity during secondary system depressurization. Considering associated uncertainties in the analyses, the potential for SGTR cannot be ignored. Accordingly, this should be considered in the evaluation of merits

  1. IEEE Std 649-1991: IEEE standard for qualifying Class 1E motor control centers for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The basic principles, requirements, and methods for qualifying Class 1E motor control centers for both harsh and mild environment applications in nuclear power generating stations are described. In addition to defining specific qualification requirements for Class 1E motor control centers and their components in accordance with the more general qualification requirements of IEEE Std 323-1983, this standard is intended to provide guidance in establishing a qualification program for demonstrating the adequacy of Class 1E motor control centers in nuclear power generating station applications

  2. Type test of Class 1E electric cables, field splices, and connections for nuclear power generating stations - 1975

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    This Standard provides direction for establishing type tests which may be used in qualifying Class 1E electric cables, field splices, and other connections for service in nuclear power generating stations. General guidelines for qualifications are given in IEEE Std 323-1974, Standard for Qualifying Class 1E Electric Equipment for Nuclear Power Generating Stations. Categories of cables covered are those used for power control and instrumentation services. Though intended primarily to pertain to cable for field installation, this guide may also be used for the qualification of internal wiring of manufactured devices

  3. Aerial radiological survey of the creeks and tributaries near the Rancho Seco Nuclear Generation Station, Clay Station, California. Date of survey: December 1984

    International Nuclear Information System (INIS)

    1986-06-01

    Radiological contamination due to man-made radionuclides was detected using hand-held instruments in the summer of 1984 in the creeks and tributaries near the Rancho Seco Nuclear Generating Station at Clay Station, California. To help determine the extent of the contamination an aerial radiological survey centered over the creeks and tributaries and including the Rancho Seco facility was conducted during the period 3 to 15 December 1984. Radiological contaminants were detected along a 9-mile segment of the system of creeks in the area. These contaminants included cesium-134, cesium-137, and cobalt-60. Radiation measurements away from the contaminated areas were the same as those made during the aerial radiological survey conducted in 1980

  4. Information technology as a key enabler in preparing for competition: ComEd's Kincaid Generating Station, a work in progress

    International Nuclear Information System (INIS)

    Borth, F.C. III; Thompson, J.W.; Mishaga, J.M.

    1996-01-01

    Through ComEd Fossil (Generating) Division's Competitive Action Plan (CAP) evaluation changes have been identified which are necessary to improve generating station performance. These changes are intended to improve both station reliability and financial margins, and are essential for stations to be successful in a competitive marketplace. Plant upgrades, advanced equipment stewardship, and personnel reductions have been identified as necessary steps in achieving industry leadership and competitive advantage. To deal effectively with plant systems and contend in the competitive marketplace Information Technology (IT) solutions to business problems are being developed. Data acquisition, storage, and retrieval are being automated through use of state-of-the-art Data Historians. Total plant, high resolution, long term process information will be accessed through Local/Wide Area Networks (LAN/WAN) connections from desktop PC's. Generating unit Thermal Performance Monitors accessing the Data Historian will analyze plant and system performance enabling reductions in operating costs, and improvements in process control. As inputs to proactive maintenance toolsets this data allows anticipation of equipment service needs, advanced service scheduling, and cost/benefit analysis. The ultimate goal is to optimize repair needs with revenue generation. Advanced applications building upon these foundations will bring knowledge of the costs associated with all the products a generating station offers its customer(s). An overall design philosophy along with preliminary results is presented; these results include shortfalls, lessons learned, and future options

  5. Control room habitability survey of licensed commercial nuclear power generating stations

    International Nuclear Information System (INIS)

    Driscoll, J.W.

    1988-10-01

    This document presents the results of a survey of control room habitability systems at twelve commercial nuclear generating stations. The survey, conducted by Argonne National Laboratory (ANL), is part of an NRC program initiated in response to concerns and recommendations of the Advisory Committee on Reactor Safeguards (ACRS). The major conclusion of the report is that the numerous types of potentially significant discrepancies found among the surveyed plants may be indicative of similar discrepancies throughout the industry. The report provides plant-specific and generalized findings regarding safety functions with respect to the consistency of the design, construction, operation and testing of control room habitability systems and corresponding Technical Specifications compared with descriptions provided in the license basis documentation including assumptions in the operator toxic gas concentration and radiation dose calculations. Calculations of operator toxic gas concentrations and radiation doses were provided in the license basis documentation and were not performed by the ANL survey team. Recommendation for improvements are provided in the report

  6. Aging management program of the reactor building concrete at Point Lepreau Generating Station

    Directory of Open Access Journals (Sweden)

    Gendron T.

    2011-04-01

    Full Text Available In order for New Brunswick Power Nuclear (NBPN to control the risks of degradation of the concrete reactor building at the Point Lepreau Generating Station (PLGS the development of an aging management plan (AMP was initiated. The intention of this plan was to determine the requirements for specific structural components of concrete of the reactor building that require regular inspection and maintenance to ensure the safe and reliable operation of the plant. The document is currently in draft form and presents an integrated methodology for the application of an AMP for the concrete of the reactor building. The current AMP addresses the reactor building structure and various components, such as joint sealant and liners that are integral to the structure. It does not include internal components housed within the structure. This paper provides background information regarding the document developed and the strategy developed to manage potential degradation of the concrete of the reactor building, as well as specific programs and preventive and corrective maintenance activities initiated.

  7. Review of Ontario Hydro Pickering 'A' and Bruce 'A' nuclear generating stations' accident analyses

    International Nuclear Information System (INIS)

    Serdula, K.J.

    1988-01-01

    Deterministic safety analysis for the Pickering 'A' and Bruce 'A' nuclear generating stations were reviewed. The methodology used in the evaluation and assessment was based on the concept of 'N' critical parameters defining an N-dimensional safety parameter space. The reviewed accident analyses were evaluated and assessed based on their demonstrated safety coverage for credible values and trajectories of the critical parameters within this N-dimensional safety parameter space. The reported assessment did not consider probability of occurrence of event. The reviewed analyses were extensive for potential occurrence of accidents under normal steady-state operating conditions. These analyses demonstrated an adequate assurance of safety for the analyzed conditions. However, even for these reactor conditions, items have been identified for consideration of review and/or further study, which would provide a greater assurance of safety in the event of an accident. Accident analyses based on a plant in a normal transient operating state or in an off-normal condition but within the allowable operating envelope are not as extensive. Improvements in demonstrations and/or justifications of safety upon potential occurrence of accidents would provide further assurance of adequacy of safety under these conditions. Some events under these conditions have not been analyzed because of their judged low probability; however, accident analyses in this area should be considered. Recommendations are presented relating to these items; it is also recommended that further study is needed of the Pickering 'A' special safety systems

  8. Environmental monitoring report for the Point Lepreau, New Brunswick nuclear generating station 1984

    International Nuclear Information System (INIS)

    Nelson, R.W.P.; Ellis, K.M.; Smith, J.N.

    1986-07-01

    The Point Lepreau Environmental Monitoring Program (PLEMP) has been established within the Department of Fisheries and Oceans to assess the environmental impact of radioactive, thermal, and chemical releases from the Point Lepreau, N.B. Nuclear Generating Station (NGS) located on the Bay of Fundy. This report contains the results for the second year of the operational phase of the monitoring program. Emphasis has been placed on those areas where effects from the NGS operation were expected to be observed. Further studies were carried out on the characterization of the thermal plume during several pre-arranged tritium releases. Attention was given to tritium levels at the outfall, in the atmosphere and in biological samples. An initial attempt was made to relate the distribution of tritium in the Point Lepreau area in various phases to local meteorological conditions. Radionuclide levels in lichen, including, for the first time, aerial lichen on a regular basis, an efficient accumulator of atmospheric particulates were monitored. In addition, radionuclide measurements were made on samples collected during the pre-operational phase from the major environmental reservoirs and these radioactivity levels were compared to previous measurements to assess the impact of the operation of the NGS. The purpose of this program is to provide government with a comprehensive scientific basis upon which to assess the environmental implications of the operation of nuclear reactors in coastal regions

  9. Modeling Woody Biomass Procurement for Bioenergy Production at the Atikokan Generating Station in Northwestern Ontario, Canada

    Directory of Open Access Journals (Sweden)

    Thakur Upadhyay

    2012-12-01

    Full Text Available Efficient procurement and utilization of woody biomass for bioenergy production requires a good understanding of biomass supply chains. In this paper, a dynamic optimization model has been developed and applied to estimate monthly supply and procurement costs of woody biomass required for the Atikokan Generating Station (AGS in northwestern Ontario, based on its monthly electricity production schedule. The decision variables in the model are monthly harvest levels of two types of woody biomass, forest harvest residues and unutilized biomass, from 19,315 forest depletion cells (each 1 km2 for a one year planning horizon. Sixteen scenarios are tested to examine the sensitivity of the cost minimization model to changing economic and technological parameters. Reduction in moisture content and improvement of conversion efficiency showed relatively higher reductions in monthly and total costs of woody biomass feedstock for the AGS. The results of this study help in understanding and designing decision support systems for optimal biomass supply chains under dynamic operational frameworks.

  10. Aging management program of the reactor building concrete at Point Lepreau Generating Station

    Science.gov (United States)

    Aldea, C.-M.; Shenton, B.; Demerchant, M. M.; Gendron, T.

    2011-04-01

    In order for New Brunswick Power Nuclear (NBPN) to control the risks of degradation of the concrete reactor building at the Point Lepreau Generating Station (PLGS) the development of an aging management plan (AMP) was initiated. The intention of this plan was to determine the requirements for specific structural components of concrete of the reactor building that require regular inspection and maintenance to ensure the safe and reliable operation of the plant. The document is currently in draft form and presents an integrated methodology for the application of an AMP for the concrete of the reactor building. The current AMP addresses the reactor building structure and various components, such as joint sealant and liners that are integral to the structure. It does not include internal components housed within the structure. This paper provides background information regarding the document developed and the strategy developed to manage potential degradation of the concrete of the reactor building, as well as specific programs and preventive and corrective maintenance activities initiated.

  11. Control room inleakage testing using tracer gases at Zion Generating station

    International Nuclear Information System (INIS)

    Lagus, P.L.; Brown, J.H.; Dubois, L.J.; Fleming, K.M.

    1993-01-01

    In order to assess the amount of air inleakage into the Control Room Envelope at Zion Generating Station (ZGS), a series of tracer gas tests using sulfur hexafluoride (SF 6 ) were performed on the Control Room ventilation system (PV system) and the Computer Room/Miscellaneous Area ventilation system (OV system) during February, 1991. Two redundant trains, denoted A and B comprise the PV system. Inleakage was measured for each train. An OV supply duct passes through the Control Room Envelope. Leakage from this duct into the Control Room would constitute air leakage into the Control room Envelope and hence any potential leakage had to be quantified. Each test attempted to measure the contribution (if any) of a particular section of PV return duct or OV supply duct to the total air inleakage into the Control Room. This paper reviews the tracer gas tests. Described here are the control room inleakage testing, HVAC equipment room duct inleakage, purge plenum inleakage, OV duct leakage into the control room envelope, vestibule PV return inleakage, TSC duct inleakage, and cable spreading room inleakage. Conclusions from the testing are presented. 5 refs., 4 figs., 7 tabs

  12. Evaluation of slow shutdown system flux detectors in Point Lepreau Generating Station - I: dynamic response characterization

    Energy Technology Data Exchange (ETDEWEB)

    Anghel, V.N.P. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Comeau, D. [New Brunswick Power Nuclear, Point Lepreau, New Brunswick (Canada); McKay, J.; Sur, B. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Taylor, D. [New Brunswick Power Nuclear, Point Lepreau, New Brunswick (Canada)

    2009-07-01

    CANDU reactors are protected against reactor overpower by two independent shutdown systems: Shut Down System 1 and 2 (SDS1 and SDS2). At the Point Lepreau Generating Station (PLGS), the shutdown systems can be actuated by measurements of the neutron flux by Platinum-clad Inconel In-Core Flux Detectors (ICFDs). These detectors have a complex dynamic behaviour, characterized by 'prompt' and 'delayed' components with respect to immediate changes in the in-core neutron flux. The dynamic response components need to be determined accurately in order to evaluate the effectiveness of the detectors for actuating the shutdown systems. The amplitudes of the prompt and the delayed components of individual detectors were estimated over a period of several years by comparison of archived detector response data with the computed local neutron flux evolution for SDS1 and SDS2 reactor trips. This was achieved by custom-designed algorithms. The results of this analysis show that the dynamic response of the detectors changes with irradiation, with the SDS2 detectors having 'prompt' signal components that decreased significantly with irradiation. Some general conclusions about detector aging effects are also drawn. (author)

  13. Improvement of Point Lepreau Generating Station ROP detector characteristics by adjusting gains in compensation amplifiers

    Energy Technology Data Exchange (ETDEWEB)

    Anghel, V., E-mail: vinicius.anghel@cnl.ca [Canadian Nuclear Laboratories, Chalk River, Ontario (Canada); Basque, M.-J. [Atlantic Nuclear Services Inc., Fredericton, New Brunswick (Canada); Comeau, D. [Point Lepreau Generating Station, Lepreau, New Brunswick (Canada); Sur, B. [Canadian Nuclear Laboratories, Chalk River, Ontario (Canada); Taylor, D. [Point Lepreau Generating Station, Lepreau, New Brunswick (Canada)

    2015-06-15

    Canadian Pressurized Heavy Water Reactors are protected against reactor overpower by 2 independent shutdown systems: Shut Down System 1 and 2. At Point Lepreau Generating Station, these shutdown systems can be actuated by signals from Platinum-clad Inconel In-Core Flux Detectors measuring the neutron flux. These detectors have a complex dynamic behaviour, characterized by 'prompt' and 'delayed' components with respect to immediate changes in the in-core neutron flux. In aging detectors, it was found that the prompt response decreases. A detector response that actuates the shutdown system effectively has to have a large prompt response and a small delayed response. These required responses may be obtained by adjusting the dynamic compensation amplifiers (compensator) settings. This paper presents the measured results of a compensation adjustment procedure for the in-core platinum-clad Inconel detectors. The compensation is computed from the detector parameters estimated by VS, a fully automated and qualified computer program that analyzes the response of the detectors. (author)

  14. IEEE standard for design qualification of safety systems equipment used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This standard is written to serve as a general standard for qualification of all types of safety systems equipment, mechanical and instrumentation as well as electrical. It also establishes principles and procedures to be followed in preparing specific safety systems equipment standards. Guidance for qualifying specific safety systems equipment may be found in various specific equipment qualification standards that are now available or are being prepared. It is required that safety systems equipment in nuclear power generating stations meet or exceed its performance requirements throughout its installed life. This is accomplished by a disciplined program of design qualification and quality assurance of design, production, installation, maintenance and surveillance. This standard is for the design qualification section of the program only. Design qualification is intended to demonstrate the capability of the equipment design to perform its safety function(s) over the expected range of normal, abnormal, design basis event, post design basis event, and in-service test conditions. Inherent to design qualification is the requirement for demonstration, within limitations afforded by established technical state-of-the-art, that in-service aging throughout the qualified life established for the equipment will not degrade safety systems equipment from its original design condition to the point where it cannot perform its required safety function(s), upon demand. The above requirement reflects the primary role of design qualification to provide reasonable assurance that design- and age-related common failure modes will not occur during performance of safety function(s) under postulated service conditions

  15. The expected environmental consequences and hazards of laser-fusion electric generating stations

    International Nuclear Information System (INIS)

    Devaney, J.J.; Pendergrass, J.H.

    The operation of an expected early form of a laser-fusion electric power plant is described and the hazards and the environmental effects of such a station are estimated. Possible environmental impacts and hazards to mankind can occur from nuclear excursions or explosions, nuclear weapon proliferation, loss of coolant accident (LOCA), tritium releases, chemical fires and accompanying releases of radioactivity or chemicals, induced radioactivity releases (other than tritium), radioactive waste disposal, lasers, normal electrical generation and steam plant effects, external intrusions, natural disasters, land use, resource and transportation use, thermal pollution, and air and water pollution. We find the principle environmental effects to be those of a medium size chemical plant. Electric, magnetic, steam, and radioactive hazards are of a lower order. Indeed in the event of extraordinary success in getting high temperatures and densities so that more difficult nuclear species can be reacted, such as protons with boron-11, there will be no radioactivity at all and also enormously lower hazardous chemical inventories. In our plant designs, for any fusion fuels, nuclear explosions (or even excursions beyond design limits) are not possible. (author)

  16. Spectral analysis of coolant activity from a commercial nuclear generating station

    International Nuclear Information System (INIS)

    Swann, J.D.; Lewis, B.J.; Ip, M.

    2008-01-01

    In support of the development of a real-time on-line fuel failure monitoring system for the CANDU reactor, actual gamma spectroscopy data files from the gaseous fission product (GFP) monitoring system were acquired from almost four years of operation at a commercial Nuclear Generating Station (NGS). Several spectral analysis techniques were used to process the data files. Radioisotopic activity from the plant information (PI) system was compared to an in-house C++ code that was used to determine the photopeak area and to a separate analysis with commercial software from Canberra-Aptec. These various techniques provided for a calculation of the coolant activity concentration of the noble gas and iodine species in the primary heat transport system. These data were then used to benchmark the Visual DETECT code, a user friendly software tool which can be used to characterize the defective fuel state based on a coolant activity analysis. Acceptable agreement was found with the spectral techniques when compared to the known defective bundle history at the commercial reactor. A more generalized method of assessing the fission product release data was also considered with the development of a pre-processor to evaluate the radioisotopic release rate from mass balance considerations. The release rate provided a more efficient means to characterize the occurrence of a defect and was consistent with the actual defect situation at the power plant as determined from in-bay examination of discharged fuel bundles. (author)

  17. Lessons learned from the seismic reevaluation of San Onofre Nuclear Generating Station, Unit 1

    International Nuclear Information System (INIS)

    Russell, M.J.; Shieh, L.C.; Tsai, N.C.; Cheng, T.M.

    1987-01-01

    A seismic reevaluation program was conducted for the San Onofre Nuclear Generating Station, Unit No. 1 (SONGS 1). SEP was created by the NRC to provide (1) an assessment of the significance of differences between current technical positions on safety issues and those that existed when a particular plant was licensed, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. The Systematic Evaluation Program (SEP) seismic review for SONGS 1 was exacerbated by the results of an evaluation of an existing capable fault near the site during the design review for Units 2 and 3, which resulted in a design ground acceleration of 0.67g. Southern California Edison Company (SCE), the licensee for SONGS 1, realized that a uniform application of existing seismic criteria and methods would not be feasible for the upgrading of SONGS 1 to such a high seismic requirement. Instead, SCE elected to supplement existing seismic criteria and analysis methods by developing criteria and methods closer to the state of the art in seismic evaluation techniques

  18. Navajo Generating Station and Federal Resource Planning; Volume 1: Sectoral, Technical, and Economic Trends

    Energy Technology Data Exchange (ETDEWEB)

    Hurlbut, David; Haase, Scott; Barrows, Clayton; Bird, Lori; Brinkman, Greg; Cook, Jeff; Day, Megan; Diakov, Victor; Hale, Elaine; Keyser, David; Lopez, Anthony; Mai, Trieu; McLaren, Joyce; Reiter, Emerson; Stoll, Brady; Tian, Tian; Cutler, Harvey; Bain, Dominique; Acker, Tom

    2016-11-01

    This study for the U.S. Bureau of Reclamation examines conditions in the electricity sector that are likely to affect federal decisions with respect to Navajo Generating Station (NGS), the largest coal-fired power plant operating in the western United States. The federal government owns 24.3% of the 2.25-gigawatt plant, which amounts to 547 megawatts (MW) of capacity. By focusing on the unique public interests that depend on the federal share of NGS, this baseline study can help the federal government develop a road map for meeting all of its goals with respect to water delivery, clean energy, emission reduction, and economic development. There is no recommendation for action in this report. Rather, its aim is to provide a credible, thorough description of baseline conditions that might affect federal decisions regarding NGS. It describes facts and trends embedded in current data, but there are no conclusions about how Reclamation or DOI should respond to the trends. The interdependencies among the many sectoral trends and federal goals are complex, and the aim of this study is to provide a foundation from which options can be tested in a deliberate manner.

  19. Evaluation of options for life cycle management of feeder cracking at the Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Gendron, T.S.; Slade, J.P.

    2003-01-01

    The CANDU industry has a predictive capability for most Heat Transport System (HTS) degradation issues that allows utilities to apply cost-effective maintenance programs. The standard approach for maintenance programs is focussed inspection and planned replacement. Some examples of degradation issues with deterministic failure rates are feeder thinning, and pressure tube elongation and deuterium ingress. However, the cracking observed in Point Lepreau Generating Station (PLGS) outlet feeder first bends is one notable exception to this behaviour. A predictive capability for feeder cracking does not currently exist for several reasons. First, the mechanism of feeder cracking, stress corrosion cracking (SCC), has to some degree a random nature. Second, although a probable environment causing cracking has been identified, the precise stress and environmental conditions for feeder crack initiation and propagation have not been defined. Finally, the very low incidence of feeder cracking observed to-date (four, all at PLGS) precludes a probabilistic or statistical prediction of failure rate. Generally, utilities select a Life Cycle Management Plan that ensures safe operation and has the lowest Net Present Value cost. In preparing a Feeder Life Cycle Management Plan, New Brunswick Power (NBP) has recognized that the Net Present Value cost is very sensitive to failure rate. Since the failure rate for feeder cracking is not well defined, the following three scenarios were considered to bound the probability of future failures at PLGS. (author)

  20. Intake-to-delivered-energy ratios for central station and distributed electricity generation in California

    International Nuclear Information System (INIS)

    Heath, Garvin A.; Nazaroff, William W.

    2007-01-01

    In previous work, we showed that the intake fraction (iF) for nonreactive primary air pollutants was 20 times higher in central tendency for small-scale, urban-sited distributed electricity generation (DG) sources than for large-scale, central station (CS) power plants in California [Heath, G.A., Granvold, P.W., Hoats, A.S., Nazaroff, W.W., 2006. Intake fraction assessment of the air pollutant exposure implications of a shift toward distributed electricity generation. Atmospheric Environment 40, 7164-7177]. The present paper builds on that study, exploring pollutant- and technology-specific aspects of population inhalation exposure from electricity generation. We compare California's existing CS-based system to one that is more reliant on DG units sited in urban areas. We use Gaussian plume modeling and a GIS-based exposure analysis to assess 25 existing CSs and 11 DG sources hypothetically located in the downtowns of California's most populous cities. We consider population intake of three pollutants - PM 2.5 , NO x and formaldehyde - directly emitted by five DG technologies - natural gas (NG)-fired turbines, NG internal combustion engines (ICE), NG microturbines, diesel ICEs, and fuel cells with on-site NG reformers. We also consider intake of these pollutants from existing CS facilities, most of which use large NG turbines, as well as from hypothetical facilities located at these same sites but meeting California's best-available control technology standards. After systematically exploring the sensitivity of iF to pollutant decay rate, the iFs for each of the three pollutants for all DG and CS cases are estimated. To efficiently compare the pollutant- and technology-specific exposure potential on an appropriate common basis, a new metric is introduced and evaluated: the intake-to-delivered-energy ratio (IDER). The IDER expresses the mass of pollutant inhaled by an exposed population owing to emissions from an electricity generation unit per quantity of electric

  1. Intake-to-delivered-energy ratios for central station and distributed electricity generation in California

    Science.gov (United States)

    Heath, Garvin A.; Nazaroff, William W.

    In previous work, we showed that the intake fraction (iF) for nonreactive primary air pollutants was 20 times higher in central tendency for small-scale, urban-sited distributed electricity generation (DG) sources than for large-scale, central station (CS) power plants in California [Heath, G.A., Granvold, P.W., Hoats, A.S., Nazaroff, W.W., 2006. Intake fraction assessment of the air pollutant exposure implications of a shift toward distributed electricity generation. Atmospheric Environment 40, 7164-7177]. The present paper builds on that study, exploring pollutant- and technology-specific aspects of population inhalation exposure from electricity generation. We compare California's existing CS-based system to one that is more reliant on DG units sited in urban areas. We use Gaussian plume modeling and a GIS-based exposure analysis to assess 25 existing CSs and 11 DG sources hypothetically located in the downtowns of California's most populous cities. We consider population intake of three pollutants—PM 2.5, NO x and formaldehyde—directly emitted by five DG technologies—natural gas (NG)-fired turbines, NG internal combustion engines (ICE), NG microturbines, diesel ICEs, and fuel cells with on-site NG reformers. We also consider intake of these pollutants from existing CS facilities, most of which use large NG turbines, as well as from hypothetical facilities located at these same sites but meeting California's best-available control technology standards. After systematically exploring the sensitivity of iF to pollutant decay rate, the iFs for each of the three pollutants for all DG and CS cases are estimated. To efficiently compare the pollutant- and technology-specific exposure potential on an appropriate common basis, a new metric is introduced and evaluated: the intake-to-delivered-energy ratio (IDER). The IDER expresses the mass of pollutant inhaled by an exposed population owing to emissions from an electricity generation unit per quantity of electric

  2. 78 FR 32278 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Science.gov (United States)

    2013-05-29

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to Information in Tier 1, Table... Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal... Table 3.3-1, ``Definition of Wall Thicknesses for Nuclear Island Buildings, Turbine Buildings, and Annex...

  3. 75 FR 13606 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-22

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. STN 50-528, STN 50-529, and STN 50-530; NRC-2010-0114] Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Environmental...-74, issued to Arizona Public Service Company (APS, the licensee), for operation of the Palo Verde...

  4. 75 FR 53985 - Arizona Public Service Company, et al., Palo Verde Nuclear Generating Station, Unit 3; Temporary...

    Science.gov (United States)

    2010-09-02

    ... NUCLEAR REGULATORY COMMISSION [Docket No. STN 50-530; NRC-2010-0281] Arizona Public Service Company, et al., Palo Verde Nuclear Generating Station, Unit 3; Temporary Exemption 1.0 Background Arizona Public Service Company (APS, the licensee) is the holder of Facility Operating License No. NPF-74, which...

  5. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Pickering A and B Generating Stations for 1996. PNGS-A and PNGS-B operated safely during 1996. Although the risk to the workers and the public is low, major safety related changes are necessary at the stations and the sustainability of those changes needs to be demonstrated. Improvement is needed by Ontario Hydro in meeting the time limits for reporting reportable events. Ontario Hydro's follow up to events and causal factor analyses continue to need improvements. Improvements are needed to operational safety and reactor maintenance at both A and B. There are signs of improvement through Ontario Hydro's plan for recovery, and in station management changes. There also appears to be commitment to safety expressed at the highest level of the utility

  6. 3D geological and hydrogeological modeling as design tools for the Conawapa generating station

    Energy Technology Data Exchange (ETDEWEB)

    Mann, J.; Sharif, S.; Smith, B. [KGS Group, Winnipeg, MB (Canada); Cook, G.N.; Osiowy, B.J. [Manitoba Hydro, Winnipeg, MB (Canada)

    2008-07-01

    Following the project's suspension in the early 1990s, part of Manitoba Hydro's recommitment study involved digital modeling of geological and hydrogeological data for the foundation design and analysis of the proposed Conawapa generating station in northern Manitoba. Three-dimensional geological and hydrogeological models have been developed to consolidate and improve the designer's ability to understand all of the information, and to assist in developing engineering alternatives which will improve the overall confidence of the design. The tools are also being leveraged for use in environmental studies. This paper provided an overview of the Conawapa site and 3-dimensional modeling goals. It described the geology and hydrogeology of the Conawapa site as well as the bedrock structure and Karst development. The paper also presented the central concepts of 3-dimensional modeling studies, including the flow of information from database to modeling software platforms. The construction of the Conawapa geological model was also presented, with particular reference to an overview of the MVS software; mesh design; and model buildup logic. The construction of the Conawapa hydrogeological model was discussed in terms of the finite element code FEFLOW software; conceptual model design; and initial observations of Conawapa groundwater flow modeling. It was concluded that recent advancement and application of 3-dimensional geological visualization software to engineering and environmental projects, including at the future Conawapa site using MVS and FEFLOW, have shown that complicated geological data can be organized, displayed, and analysed in a systematic way, to improve site visualization, understanding, and data relationships. 19 refs., 9 figs.

  7. An artificial intelligence (AI) NOx/heat rate optimization system for Ontario Hydro`s fossil generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Frank, A.; Bodach, P. [Ontario Hydro, Toronto, ON (Canada); Warriner, G. [Radian International, Tucker, GA (United States); Noblett, J. [Radian International, Austin, TX (United States); Slatsky, M. [Southern Company, Birmingham, AL (United States)

    1999-08-01

    Artificial intelligence (AI)-based software packages which can optimize power plant operations that improves heat rate and also reduces nitrogen oxide emissions are now commonly available for commercial use. This paper discusses the implementation of the AI-based NOx and Heat Rate Optimization System at Ontario Hydro`s generation stations, emphasizing the current AI Optimization Project at Units 5 and 6 of the Lakeview Generating Station. These demonstration programs are showing promising results in NOx reduction and plant performance improvement. The availability of the plant Digital Control System (DCS) in implementing AI optimization in a closed-loop system was shown to be an important criterion for success. Implementation of AI technology at other Ontario Hydro fossil generating units as part of the overall NOx emission reduction system is envisaged to coincide with the retrofit of the original plant control system with the latest DCS systems. 14 refs., 3 figs.

  8. AECL's participation in the commissioning of Point Lepreau generating station unit 1

    International Nuclear Information System (INIS)

    Chawla, S.; Singh, K.; Yerramilli, S.

    1983-05-01

    Support from Atomic Energy of Canada Ltd. (AECL) to Point Lepreau during the commissioning program has been in the form of: seconded staff for commissioning program management, preparation of commissioning procedures, and hands-on commissioning of several systems; analysis of test results; engineering service for problem solving and modifications; design engineering for changes and additions; procurement of urgently-needed parts and materials; technological advice; review of operational limits; interpretation of design manuals and assistance with and preparation of submissions to regulatory authorities; and development of equipment and procedures for inspection and repairs. This, together with AECL's experience in the commissioning of other 600 MWe stations, Douglas Point and Ontario Hydro stations, provides AECL with a wide range of expertise for providing operating station support services for CANDU stations

  9. Assesment of Carbon Credits for Power Generation Systems at GSM Base Station Site

    OpenAIRE

    Ani, Vincent Anayochukwu; Ani, Emmanuel Onyeka

    2016-01-01

    Electricity production is often a source of CO2 emissions, for instance when fossil fuel is combusted in power plants. Therefore the root cause of pollution coming from telecommunication industry is the source of energy (diesel genset) the network operators used in running their Base station sites. Energy consumption of using diesel to power base station by telecom networks is a contributor to global greenhouse gas (GHG) emissions. This paper presents the comparative carbon credits of hybrid ...

  10. The next nuclear power station generation: Beyond-design accident concepts, methods, and action sequence

    International Nuclear Information System (INIS)

    Asmolov, V.G.; Khakh, O.Ya.; Shashkov, M.G.

    1993-01-01

    The problem of beyond-design accidents at nuclear stations will not be solved unless a safety culture becomes a basic characteristic of all lines of activity. Only then can the danger of accidents as an objective feature of nuclear stations be eliminated by purposive skilled and responsible activities of those implementing safety. Nuclear-station safety is provided by the following interacting and complementary lines of activity: (1) the design and construction of nuclear stations by properly qualified design and building organizations; (2) monitoring and supervision of safety by special state bodies; (3) control of the station by the exploiting organization; and (4) scientific examination of safety within the above framework and by independent organizations. The distribution of the responsibilities, powers, and right in these lines should be defined by a law on atomic energy, but there is not such law in Russian. The beyond-design accident problem is a key one in nuclear station safety, as it clear from the serious experience with accidents and numerous probabilistic studies. There are four features of the state of this topic in Russia that are of major significance for managing accidents: the lack of an atomic energy law, the inadequacy of the technical standards, the lack of a verified program package for nuclear-station designs in order to calculate the beyond-design accidents and analyze risks, and a lack of approach by designers to such accidents on the basis of international recommendations. This paper gives a brief description of three-forming points in the scientific activity: the general concept of nuclear-station safety, methods of analyzing and providing accident management, and the sequence of actions developed by specialists at this institute in recent years

  11. Generation of real-time global ionospheric map based on the global GNSS stations with only a sparse distribution

    Science.gov (United States)

    Li, Zishen; Wang, Ningbo; Li, Min; Zhou, Kai; Yuan, Yunbin; Yuan, Hong

    2017-04-01

    The Earth's ionosphere is part of the atmosphere stretching from an altitude of about 50 km to more than 1000 km. When the Global Navigation Satellite System (GNSS) signal emitted from a satellite travels through the ionosphere before reaches a receiver on or near the Earth surface, the GNSS signal is significantly delayed by the ionosphere and this delay bas been considered as one of the major errors in the GNSS measurement. The real-time global ionospheric map calculated from the real-time data obtained by global stations is an essential method for mitigating the ionospheric delay for real-time positioning. The generation of an accurate global ionospheric map generally depends on the global stations with dense distribution; however, the number of global stations that can produce the real-time data is very limited at present, which results that the generation of global ionospheric map with a high accuracy is very different when only using the current stations with real-time data. In view of this, a new approach is proposed for calculating the real-time global ionospheric map only based on the current stations with real-time data. This new approach is developed on the basis of the post-processing and the one-day predicted global ionospheric map from our research group. The performance of the proposed approach is tested by the current global stations with the real-time data and the test results are also compared with the IGS-released final global ionospheric map products.

  12. Ecological studies of wood-boring bivalves in the vicinity of the Oyster Creek Nuclear Generating Station. Progress report Sep-Nov 81

    International Nuclear Information System (INIS)

    Hoagland, K.E.; Crocket, L.

    1982-06-01

    The species composition, distribution, and population dynamics of wood-boring bivalves are being studied in the vicinity of the Oyster Creek Nuclear Generating Station, Barnegat Bay, New Jersey. Untreated wood test panels are used to collect organisms at 12 stations. Physiological tolerances of 3 species are also under investigation in the laboratory. Competition among the species is being analyzed. In the fall of 1981, Teredo bartschi remained in Oyster Creek despite continuous prolonged outages of the Oyster Creek Nuclear Generating Station

  13. Ring thermal shield piping modification at Pickering Nuclear Generating Station 'A' Unit 1

    International Nuclear Information System (INIS)

    Brown, R.; Cobanoglu, M.M.

    1995-01-01

    Each of the four Pickering Nuclear Generating Station A (PNGSA) CANDU units was constructed with its reactor and dump tank surrounded by a concrete Calandria Vault (CV). The Ring Thermal Shield (RTS) system at PNGSA units is a water cooled structure with internal cooling channels with the purpose of attenuating excessive heat flux from the calandria shell to the end shield rings and adjoining concrete (Figure 1). In newer CANDU units the reactor calandria vessel is surrounded by a large water filled shield tank which eliminates the requirement for the RTS system. The RTS structures are situated in the space between the calandria and the vault walls. Each RTS is assembled from eight flat sided carbon steel segments, tilted towards the calandria and supported from the end shield rings. Cooling water to the RTS is supplied by carbon steel cooling pipes with a portion of the pipe run embedded in the vault walls. Flow through each RTS is divided into two independent circuits, having an inlet and an outlet cooling line. There are four locations of RTS inlet and outlet cooling lines. The inlet lines are located at the bottom and the outlet lines at the top of the RTS. The 'L' shaped section of RTS inlet and outlet cooling lines, from the RTS waterbox to the start of embedded portion at the concrete wall, had become defective due to corrosion induced by excessive Moisture levels in the calandria vaults. An on-line leak sealing capability was developed and placed in service in all four PNGSA units. However, a leak found during the 1994 Unit 1 outage was too large,to seal with the current capability, forcing Ontario Hydro (OH) to develop a method to replace the corroded pipes. The repair project was subject to some lofty performance targets. All tools had to be able to withstand dose rates of up to 3000 Rem/hour. These tools, along with procedures and personnel had to successfully repair the RTS system within 6 months otherwise a costly outage extension would result. This

  14. Eddy current magnetic bias x-probe qualification and inspection of steam generator Monel 400 tubing in Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Lepine, B.A.; Van Langen, J.; Obrutsky, L.

    2006-01-01

    This paper presents an overview of the x-probe MB 350 eddy current inspection array probe, for detection of open OD axial crack-like flaws in Monel 400 tubes at Pickering Nuclear Generating Station. This report contains a selection of inspection results from the field inspections performed with this probe during the 2003 and 2004 period at Pickering Nuclear Generating Station A and B. During the 2003 in-service eddy current inspection results of Pickering Nuclear Generating Station A (PNGS-A) Unit 2, a 13 mm (0.5 inch) long axial indication was detected by the CTR1 bobbin and CTR2-C4 array probes in Tube R25-C52 of Steam Generator (SG) 11 in the hot leg sludge pile region. An experimental magnetic bias X-probe, specially designed by Zetec for inspection of Monel 400 tubing, was deployed and the indication was characterized as a potential out diameter (OD) axially oriented crack. Post-inspection tube pulling and destructive examination confirmed the presence of an Environmentally Assisted Crack (EAC), approximately 80% deep and 13mm long. Due to the significance of this discovery, Ontario Power Generation (OPG) requested AECL to initiate a program for qualification of the X-probe MB 350 for the detection of OD axial cracks in medium to high magnetic permeability μ r Monel 400 PNGS-A and B steam generator tubing at different locations. The X-probe MB 350 subsequently has been deployed as a primary inspection probe for crack detection for PNGS steam generators. (author)

  15. Safety Evaluation Report related to the operation of Hope Creek Generation Station (Docket No. 50-354). Supplement No. 6

    International Nuclear Information System (INIS)

    1986-07-01

    Supplement No. 6 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company on its own behalf as co-owner and as agent for the other co-owner, the Atlantic City Electric Company, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that has not been resolved at the time of the publication of the Safety Evaluation Report. This supplement supports the issuance of a full-power license to operate Hope Creek Generating Station

  16. Field testing of behavioral barriers for cooling water intake structures -test site 1 - Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Patrick, P.H.; McKinley, R.S.; Micheletti, W.C.

    1988-01-01

    A multi-year research program was developed by the Electric Power Research Institute to evaluate the effectiveness of selected behavioral systems for fish exclusion at sites representative of different aquatic environments. The first test site was the Pickering Nuclear Generating Station (NGS) located on Lake Ontario which represented the Great Lakes environment. A single pneumatic popper, a low frequency, high amplitude sound deterrent, was found to effectively exclude adult alewife, the principal species impinged at Pickering NGS. An air bubble curtain, used either alone or combined with strobe lights, was not a consistent deterrent. Effectiveness of air bubbles was only enhanced when used in association with a popper. Strobe lights were the least effective of the three devices tested. Operation of all three devices together did not surpass the effectiveness of the popper when used alone. Sound deterrents show promise for fish exclusion at generating stations located on the Great Lakes

  17. IEEE standard for type test of class 1E electric cables, field splices, and connections for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    The Institute of Electrical and Electronics Engineers has generated this document to provide guidance for developing a program to type test cables, field splices, and connections and obtain specific type test data. It supplements IEEE Std 323-1974 Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations, which describes basic requirements for equipment qualification. It is the integrated performance of the structures, fluid systems, the electrical systems, the instrumentation systems of the station, and in particular, the plant protection system, that limits the consequences of accidents. Seismic effects on installed cable systems are not within the scope of this document. Section 2 of this guide is an example of type tests. It is the purpose of this guide to deal with cable and connections; however, at the time of issue, detailed examples of tests for connections were not available

  18. The generation of simple compliance boundaries for mobile communication base station antennas using formulae for SAR estimation.

    Science.gov (United States)

    Thors, B; Hansson, B; Törnevik, C

    2009-07-07

    In this paper, a procedure is proposed for generating simple and practical compliance boundaries for mobile communication base station antennas. The procedure is based on a set of formulae for estimating the specific absorption rate (SAR) in certain directions around a class of common base station antennas. The formulae, given for both whole-body and localized SAR, require as input the frequency, the transmitted power and knowledge of antenna-related parameters such as dimensions, directivity and half-power beamwidths. With knowledge of the SAR in three key directions it is demonstrated how simple and practical compliance boundaries can be generated outside of which the exposure levels do not exceed certain limit values. The conservativeness of the proposed procedure is discussed based on results from numerical radio frequency (RF) exposure simulations with human body phantoms from the recently developed Virtual Family.

  19. Low earth orbit environmental effects on the space station photovoltaic power generation systems

    International Nuclear Information System (INIS)

    Nahra, H.K.

    1977-01-01

    A summary of the Low Earth Orbital Environment, its impact on the photovoltaic power systems of the space station and the solutions implemented to resolve the environmental concerns or issues are described. Low Earth Orbital Environment (LEO) presents several concerns to the photovoltaic power systems of the space station. These concerns include atomic oxygen interaction with the polymeric substrate of the solar arrays, ionized environment effects on the array operating voltage, the effects of the meteoroids and debris impacts and penetration through the different layers of the solar cells and their circuits, and the high energy particle and radiation effects on the overall solar array performance. Potential solutions to some of the degrading environmental interactions that will provide the photovoltaic power system of the space station with the desired life are also summarized

  20. IEEE Std 317-1972: IEEE standard for electric penetration assemblies in containment structures for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard prescribes the mechanical, electrical, and test requirements for the design, construction, and installation of electric penetration assemblies in containment structures for stationary nuclear power generating stations. The electric conductor and insulation characteristics of external circuits which connect to penetration assemblies are beyond the scope of these criteria. If there should be any conflict between this standard and those documents referenced herein, this standard shall take precedence over the referenced documents

  1. Confirmatory Survey Results for the Reactor Building Dome Upper Structural Surfaces, Rancho Saco Nuclear Generating Station, Herald, California

    International Nuclear Information System (INIS)

    Wade C. Adams

    2006-01-01

    Results from a confirmatory survey of the upper structural surfaces of the Reactor Building Dome at the Rancho Seco Nuclear Generating Station (RSNGS) performed by the Oak Ridge Institute for Science and Education for the NRC. Also includes results of interlaboratory comparison analyses on several archived soil samples that would be provided by RSNGS personnel. The confirmatory surveys were performed on June 7 and 8, 2006

  2. Maintenance and life assessment of steam generators at Embalse Nuclear Station

    International Nuclear Information System (INIS)

    Luna, P.; Diaz, G.; Sveruga, H.; Sainz, R.

    2006-01-01

    The Embalse Nuclear Generating Station (ENGS) has four vertical I-800 U-tubes Steam Generators (SGs) manufactured by Babcock and Wilcox (B and W). They are one of the most important components from the point of view of safety and cost-related elements for potential life extensions in case of a replacement thereof. A Life Management program has been started covering the entire plant and starting with the Life Assessment (LA) of this component which consists in a systematic way to evaluate aging mechanisms focused on the plant refurbishment and life extension. Because of this, maintenance-based ageing assessment from beginning of operation is analyzed and current LA-frame maintenance and inspections programs are carried out in order to maintain a high availability of the SGs then to enable the planning for the plant life extension. The most important taken actions have been the Eddy Current (EC) In Service Inspection program which performs 100% of the tubes of two SG every 1.5 years started in 1992, the mechanical cleaning by blasting of the internal tube surface, the sludge removal from the secondary side tubesheet, the divider plate replacement, the installation of antivibration bars (AVB's), installation of TSP inspection ports and an exhaustive inspection of the secondary internals as a preliminary result of the Life Assessment started during early 2000. The most relevant aging mechanism up to 2004 was the Flow Accelerated Corrosion (FAC) of U-bend supports and consequent fretting of tubes. The eddy current inspections allowed the fretting degradation to be detected and mitigated by installing AVB's. Currently, efficiency of this mitigating action is being performed by vibration measurements and visual inspections. However, other degradation mechanism that could have origin due to the U-bend FAC like loose part damage (LPD) is being to be analyzed since could be an issue in the future. At present, FAC degradation on the cold leg side and sludge deposition on the

  3. Tritium releases from the Pickering Nuclear Generating Station and birth defects and infant mortality in nearby communities 1971-1988

    International Nuclear Information System (INIS)

    Johnson, K.C.; Rouleau, J.

    1991-10-01

    This study was commissioned to examine whether there were elevated rates of stillbirth, birth defects, or death in the first year of life between 1971 and 1988 among offspring of residents of communities within a 25-kilometre radius of the Pickering Nuclear Generating Station. The study was also to investigate whether there were any statistical associations between the monthly airborne or waterborne tritium emissions from the Pickering Nuclear Generating Station and the rates of these reproductive outcomes. Overall analysis did not support a hypothesis of increased rates of stillbirths, neonatal mortality or infant mortality near the Pickering Nuclear Generating Station, or a hypothesis of increased birth prevalence of birth defects for 21 of 22 diagnostic categories. The prevalence of Down Syndrome was elevated in both Pickering and Ajax; however, there was no consistent pattern between tritium release levels and Down Syndrome prevalence, chance could not be ruled out for the associations between Down Syndrome and tritium releases or ground-monitored concentrations, the association was detected in an analysis where multiple testing was done which may turn up significant associations by change, and maternal residence at birth and early in pregnancy needs to be verified. The association between Down Syndrome and low-level radiation remains indeterminate when existing evidence from epidemiological studies is summed. The estimated radiation exposure from the nuclear plant for residents of Pickering and Ajax is lower by a factor of 100 than the normal natural background radiation. Further study is recommended. (21 tabs., 29 figs., 5 maps, 37 refs.)

  4. DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION

    International Nuclear Information System (INIS)

    K. Payette; D. Tillman

    2001-01-01

    During the period October 1, 2000 - December 31, 2000, Allegheny Energy Supply Co., LLC (Allegheny) executed a Cooperative Agreement with the National Energy Technology Laboratory to implement a major cofiring demonstration at the Willow Island Generating Station Boiler No.2. Willow Island Boiler No.2 is a cyclone boiler. Allegheny also will demonstrate separate injection cofiring at the Albright Generating Station Boiler No.3, a tangentially fired boiler. The Allegheny team includes Foster Wheeler as its primary subcontractor. Additional subcontractors are Cofiring Alternatives and N.S. Harding and Associates. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. The second quarter of the project involved completing the designs for each location. Further, geotechnical investigations proceeded at each site. Preparations were made to perform demolition on two small buildings at the Willow Island site. Fuels strategies were initiated for each site. Test planning commenced for each site. A groundbreaking ceremony was held at the Willow Island site on October 18, with Governor C. Underwood being the featured speaker

  5. the Preliminary Research Based on Seismic Signals Generated by Hutubi Transmitting Seismic Station with One Large-volume Airgun Array

    Science.gov (United States)

    Wang, Q.; Su, J.; Wei, Y.; Zhang, W.; Wang, H.; Wang, B.; Ji, Z.

    2017-12-01

    For studying the subsurface structure and its subtle changes, we built the Hutubi transmitting seismic station with one large-volume airgun array at one artificial water pool in the northern segment of Tianshan mountain, where earthquakes occurred frequently. The airgun array consists of six airguns with every airgun capacity of 2000in3, and the artificial water pool with the top diameter of 100m, bottom diameter of 20m and the depth of 18m.We started the regular excitation experiment with the large-volume airgun source every week since June, 2013. Using seismic signals geneated by the Hutubi airgun source, we made the preliminary research on the airgun source, waveform characteristics and the subsurface velocity changes in the northern Tiansh mountain. The results are as follows: The seismic signal exited by the airgun source is characteristic of low-frequency ,and the dominant frequency is in the range of 2 6Hz. The Hutubi transmitting seismic station can continuously generate long-distance detectable and highly repeatable signals, and the correlation coefficient of sigals is greater than 0.95; and the longest propagation distance arrives to 380km, in addition, the 5000-shot stacked sigal using the phase weighted stack technique can be identified in the station, which is about 1300km from the Hutubi transmitting seismic station. Hutubi large-volume airgun source is fitted to detect and monitor the regional-scale subsurface stress state. Applying correlation test method, we measured weak subsurface velocity changes in the northern Tianshan mountain, and found that the several stations, which are within 150km from the the Hutubi transmitting seismic station, appeared 0.1 0.2% relative velocity changes before the Hutubi MS6.2 earthquake on Dec.8, 2016.

  6. Management of main generator condition during long term plant shut down at Higashidori Nuclear Power Station Unit 1

    International Nuclear Information System (INIS)

    Kato, Seiji

    2014-01-01

    Higashidori Nuclear Power Station Unit 1 shut down on February 6, 2011 to start 4th refuel outage. On March 11, 2011, we keep going refuel outage on this moment a large earthquake occurred and tsunami was generated following it which called 'Great East Japan Earthquake'. Refuel outage takes 3 ∼ 5 months normally but Higashidori NPS still keeping shut down over 3 years due to some issues. In this paper, we introduce about management of Main generator condition during long term plant shut down situation in addition to normal plant shut down situation to keep well. (author)

  7. Availability of uranium present in the sludge generated at two stations of potable water treatment

    International Nuclear Information System (INIS)

    Munoz-Serrano, A.; Baeza, A.; Salas, A.; Guillen, J.

    2013-01-01

    During the treatment is carried out in a Station Potable Water Treatment Plant sludge enriched are produced in components that have been removed from the water. The concentration and availability of radionuclides accumulated in a sludge during coagulation-flocculation will condition possible later use, so it is essential to carry out the characterization of sludge and its chemical speciation. (Author)

  8. San Onofre Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Gross electrical energy generated was 2,610,000 MWH with the generator on line 6,162.9 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, steam generator tube inspections, primary coolant chemistry, containment penetration leak tests, and radiological environmental monitoring

  9. The contribution of small hydro power stations to the electricity generation in Greece: Technical and economic considerations

    International Nuclear Information System (INIS)

    Kaldellis, J.K.

    2007-01-01

    Hydropower is the most widely used renewable energy source worldwide, contributing almost with 18.5% to the fulfillment of the planet electricity generation. However, most locations in Europe appropriate for the installation of large hydro power stations have already been exploited. Furthermore, there is a significant local communities' opposition towards new large power stations; hence, small hydro power stations remain one of the most attractive opportunities for further utilization of the available hydro potential. Greece and more precisely the country's mainland possesses a significant hydro-power potential which is up to now only partially exploited. In parallel, a large number of private investors have officially expressed their interest in creating small hydro power stations throughout the country, encouraged by the significant Greek State subsidy opportunities for renewable energy applications. However, up to now a relatively small number of projects have been realized, mainly due to decision-making problems, like the administrative bureaucracy, the absence of a rational national water resources management plan and the over-sizing of the proposed installations. Certainly, if the above problems are suitably treated, small hydro-power plants can be proved considerably profitable investments, contributing also remarkably to the national electricity balance and replacing heavy polluting lignite and imported oil. In the context of the above interesting issues, the present study reviews in detail the existing situation of small hydropower plants in Greece and investigates their future prospects as far as the energy, economic and environmental contribution are concerned

  10. Draft environmental statement related to the operation of Hope Creek Generating Station (Docket No. 50-354)

    International Nuclear Information System (INIS)

    Wagner, D.H.

    1984-06-01

    This report contains an assessment of the environmental impact associated with the operation of the Hope Creek Generating Station pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for Hope Creek Generating Station, Unit 1

  11. Different methods of informing the public on projected sites of nuclear generating stations. Results in France

    International Nuclear Information System (INIS)

    Taccoen, L.B.C.

    1977-01-01

    The situation in France of local public opinion concerning nuclear power stations is very different, according to the region in question. It seems that in industrialized regions, where the inhabitants are already familiar with nuclear energy, public opinion is much more open to the installation of new reactors. In regions which are only slightly industrialized, however, the prejudices of the population against nuclear energy can be very strong. This situation is quite serious because it could lead to an even greater widening of the development gap between various regions in France. Electricite de France has thus been led to develop a program of public information concerning the problems of nuclear energy. In practice, this program consists of: a policy of active presence in meeting and debates as well as at the actual site; eventual opening of information centers; and organization of visists of existing nuclear power stations [fr

  12. AECB staff annual assessment of the Bruce A Nuclear Generating Station for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    AECB believe that Ontario Hydro operated Bruce A in a safe manner during 1994, and that the risk to workers and the public has been maintained at an acceptably low level. Radiation doses to workers and releases to the environment were well below regulatory limits. All special safety systems met availability targets. We noted improvements in operation and maintenance but some further improvements are still required. This is particularly true of the station's compliance with the Operating Licence. AECB believe that the station continues to be well managed, with a high priority placed on safety. However, there is a need for increased capability in the area of safety analysis and assessment. 4 tabs., 4 figs

  13. Optimizing the use of operating experience at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    International Nuclear Information System (INIS)

    Williams, E.L.

    1991-01-01

    One of the most significant lessons learned from the Three Mile Island event (March 1979), and again with the Chernobyl disaster - (April 1986) was the ongoing requirement to learn from our mistakes and near misses, and those of our fellow utilities around the world: so that as an industry we do not repeat the same mistakes. The very future of our industry will depend on how well each one of us accomplishes this important ask. This paper describes in detail the challenges encountered by one station when incorporating a comprehensive 'Operating Program'. It begins with the Corporate Office's directives to its stations for such a program; and follows up with the details of the actual station implementation of the program, and day to day operating experiences. The paper describes in detail the following Operating Experience programs: - Root Cause Determination process. The Institute of Nuclear Power Operations, Human Performance Enhancement System (HPES) as an integral component of the Root Cause process. Finding solutions for our station for problems identified elsewhere is covered herein; - Significant Event Recommendation Tracking System: - Commitment Tracking System; - Operating Experience (Sharing Lessons Learned) System. The paper will show all the above processes tie closely together and complement each other. The paper discusses the staff required for such processes and their training requirements. It recommends process time lines, reporting mechanisms, and sign off requirements. It will describe the equipment utilized to carry out this work effectively, and with a minimum of staff. One unique feature of the Bruce 'A' system is an 'Effectiveness Follow-Up', usually three to six months after the event recommendations have been completed. By rechecking the finished actions and reviewing them with the personnel involved with the originating event we ensure that the real root causes have been identified and resolved. (author)

  14. Optimizing the use of operating experience at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    Energy Technology Data Exchange (ETDEWEB)

    Williams, E L [Operating Experience Reactor Safety, Bruce Nuclear Generating Station ' A' , Ontario Hydro, Tiverton, Ontario (Canada)

    1991-04-01

    One of the most significant lessons learned from the Three Mile Island event (March 1979), and again with the Chernobyl disaster - (April 1986) was the ongoing requirement to learn from our mistakes and near misses, and those of our fellow utilities around the world: so that as an industry we do not repeat the same mistakes. The very future of our industry will depend on how well each one of us accomplishes this important ask. This paper describes in detail the challenges encountered by one station when incorporating a comprehensive 'Operating Program'. It begins with the Corporate Office's directives to its stations for such a program; and follows up with the details of the actual station implementation of the program, and day to day operating experiences. The paper describes in detail the following Operating Experience programs: - Root Cause Determination process. The Institute of Nuclear Power Operations, Human Performance Enhancement System (HPES) as an integral component of the Root Cause process. Finding solutions for our station for problems identified elsewhere is covered herein; - Significant Event Recommendation Tracking System: - Commitment Tracking System; - Operating Experience (Sharing Lessons Learned) System. The paper will show all the above processes tie closely together and complement each other. The paper discusses the staff required for such processes and their training requirements. It recommends process time lines, reporting mechanisms, and sign off requirements. It will describe the equipment utilized to carry out this work effectively, and with a minimum of staff. One unique feature of the Bruce 'A' system is an 'Effectiveness Follow-Up', usually three to six months after the event recommendations have been completed. By rechecking the finished actions and reviewing them with the personnel involved with the originating event we ensure that the real root causes have been identified and resolved. (author)

  15. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  16. Life Science on the International Space Station Using the Next Generation of Cargo Vehicles

    Science.gov (United States)

    Robinson, J. A.; Phillion, J. P.; Hart, A. T.; Comella, J.; Edeen, M.; Ruttley, T. M.

    2011-01-01

    With the retirement of the Space Shuttle and the transition of the International Space Station (ISS) from assembly to full laboratory capabilities, the opportunity to perform life science research in space has increased dramatically, while the operational considerations associated with transportation of the experiments has changed dramatically. US researchers have allocations on the European Automated Transfer Vehicle (ATV) and Japanese H-II Transfer Vehicle (HTV). In addition, the International Space Station (ISS) Cargo Resupply Services (CRS) contract will provide consumables and payloads to and from the ISS via the unmanned SpaceX (offers launch and return capabilities) and Orbital (offers only launch capabilities) resupply vehicles. Early requirements drove the capabilities of the vehicle providers; however, many other engineering considerations affect the actual design and operations plans. To better enable the use of the International Space Station as a National Laboratory, ground and on-orbit facility development can augment the vehicle capabilities to better support needs for cell biology, animal research, and conditioned sample return. NASA Life scientists with experience launching research on the space shuttle can find the trades between the capabilities of the many different vehicles to be confusing. In this presentation we will summarize vehicle and associated ground processing capabilities as well as key concepts of operations for different types of life sciences research being launched in the cargo vehicles. We will provide the latest status of vehicle capabilities and support hardware and facilities development being made to enable the broadest implementation of life sciences research on the ISS.

  17. Rancho Seco Nuclear Generating Station, Unit 1. Annual report for 1976

    International Nuclear Information System (INIS)

    1977-03-01

    Net electrical energy generated was 2,205,091 MWH with the generator on line 2,662 hrs. Information is presented concerning operations, changes, tests, maintenance, fuel performance, refueling, shutdowns and outages, containment local leak rate testing, and power generation

  18. Volume reduction/solidification of liquid radioactive waste using bitumen at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    International Nuclear Information System (INIS)

    Day, J.E.; Baker, R.L.

    1995-01-01

    Ontario Hydro at the Bruce Nuclear Generating Station 'A' has undertaken a program to render the station's liquid radioactive waste suitable for discharge to Lake Huron by removing sufficient radiological and chemical contaminants to satisfy regulatory requirements for emissions. The system will remove radionuclide and chemical contaminants from five different plant waste streams. The contaminants will be immobilized and stored at on-site radioactive waste storage facilities and the purified streams will be discharged. The discharge targets established by Ontario Hydro are set well below the limits established by the Ontario Ministry of Environment (MOE) and are based on the Best Available Technology Economically Achievable Approach (B.A.T.E.A.). ADTECHS Corporation has been selected by Ontario Hydro to provide volume reduction/solidification technology for one of the five waste streams. The system will dry and immobilize the contaminants from a liquid waste stream in emulsified asphalt using thin film evaporation technology

  19. The Energy Cost Analysis of Hybrid Systems and Diesel Generators in Powering Selected Base Transceiver Station Locations in Nigeria

    Directory of Open Access Journals (Sweden)

    Peter Ozaveshe Oviroh

    2018-03-01

    Full Text Available As more locations gain access to telecommunication, there is a growing demand to provide energy in a reliable, efficient and environmentally friendly manner while effectively addressing growing energy needs. Erratic power supply and rising operation costs (OPEX in Nigeria have increased the need to harness local renewable energy sources. Thus, identifying the right generator schedule with the renewable system to reduce OPEX is a priority for operators and vendors. This study evaluates the energy costs of hybrid systems with different generator schedules in powering base transceiver stations in Nigeria using the Hybrid Optimization Model for Electric Renewable (HOMER. A load range of 4 kW to 8 kW was considered using: (i an optimised generator schedule; (ii forced-on generator schedule and (iii the generator-only schedule. The results showed an optimal LCOE range between averages of USD 0.156/kWh to 0.172/kWh for the 8 kW load. The percent energy contribution by generator ranges from 52.80% to 60.90%, and by the solar PV system, 39.10% to 47.20%. Excess energy ranges from 0.03% to 14.98%. The optimised generator schedule has the highest solar PV penetration of 56.8%. The OPEX savings on fuel ranges from 41.68% to 47% for the different load schedules and carbon emission savings of 4222 kg to 31,428.36 kg. The simulation results shows that powering base stations using the optimised hybrid system schedule would be a better option for the telecom industry.

  20. Selective analysis of power plant operation on the Hudson River with emphasis on the Bowline Point Generating Station. Volume 1

    International Nuclear Information System (INIS)

    Barnthouse, L.W.; Cannon, J.B.; Christensen, S.G.

    1977-07-01

    A comprehensive study of the effects of power plant operation on the Hudson River was conducted. The study included thermal, biological, and air quality effects of existing and planned electrical generating stations. This section on thermal impacts presents a comprehensive mathematical modeling and computer simulation study of the effects of heat rejection from the plants. The overall study consisted of three major parts: near-field analysis; far-field analysis; and zone-matched near-field/far-field analysis. Near-field analyses were completed for Roseton, Danskammer, and Bowline Point Generating Stations, and near-field dilution ratios range from a low of about 2 for Bowline Point and 3 for Roseton to a maximum of 6 for both plants. The far-field analysis included a critical review of existing studies and a parametric review of operating plants. The maximum thermal load case, based on hypothetical 1974 river conditions, gives the daily maximum cross-section-averaged and 2-mile-segment-averaged water temperatures as 83.80 0 F in the vicinity of the Indian Point Station and 83.25 0 F in the vicinity of the Bowline Station. This maximum case will be significantly modified if cooling towers are used at certain units. A full analysis and discussion of these cases is presented. A study of the Hudson River striped bass population is divided into the following eight subsections: distribution of striped bass eggs, larvae, and juveniles in the Hudson River; entrainment mortality factor; intake factor; impingement; effects of discharges; compensation; model estimates of percent reduction; and Hudson River striped bass stock

  1. Obtaining college credit for licensed operator courses at the Wolf Creek Generating Station

    International Nuclear Information System (INIS)

    Russo, C.W.; Coulthard, R.C.

    1985-01-01

    The presentation examined alternatives to formal college courses as a means to obtain college credit toward a baccalaureate degree for station operations personnel. The focus is on the American Council on Education (ACE-PONSI) program which evaluates and makes credit recommendations for courses sponsored by organizations, like utilities, whose primary function is not education. Significant elements of the licensed operator program were prepared for an ACE-PONSI review and determined to be equivalent to college level nuclear engineering technology course work. The ACE-PONSI evaluation provides a good foundation and a significant amount of the training program evaluation required prior to the INPO accreditation effort

  2. 1300MVA steam-turbine generators for Kansai Electric Power's Oi Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Oishi, N; Amagasa, N; Ito, H; Yagi, K [Mitsubishi Electric Corp., Kobe (Japan). Kobe Works

    1977-06-01

    Mitsubishi Electric has completed two 1300 MVA generators, equipped with 5500kW brushless exciters, that will be the No. 1 and No. 2 generators of the Oi plant. They are among the largest anywhere, and incorporate such technological innovations as water cooling of the stator coil and asymmetrical arrangement of the rotor slots. The article discusses generator specifications and construction, the brushless exciter, and the results of factory tests.

  3. Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Workshop

    International Nuclear Information System (INIS)

    Hoopingarner, K.R.; Vause, J.W.

    1987-08-01

    Pacific Northwest Laboratory (PNL) evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume II, reports the results of an industry-wide workshop held on May 28 and 29, 1986, to discuss the technical issues associated with aging of nuclear service emergency diesel generators. The technical issues discussed most extensively were: man/machine interfaces, component interfaces, thermal gradients of startup and cooldown and the need for an accurate industry database for trend analysis of the diesel generator system

  4. Socio-economic impacts of nuclear generating stations: Nine Mile Point and Fitzpatrick case study

    International Nuclear Information System (INIS)

    Branch, K.; Cochran, R.; Meale, R.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Nine Mile Point and Fitzpatrick nuclear power stations. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  5. Socio-economic impacts of nuclear generating stations: Crystal River Unit 3 case study

    International Nuclear Information System (INIS)

    Bergmann, P.A.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Crystal River Unit 3 nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  6. Socio-economic impacts of nuclear generating stations: Surry case study

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Surry nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  7. Socio-economic impacts of nuclear generating stations: Calvert Cliffs case study

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Calvert Cliffs nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  8. Socio-economic impacts of nuclear generating stations: Three Mile Island case study

    International Nuclear Information System (INIS)

    Flynn, C.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Three Mile Island nuclear power stations. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  9. Socio-economic impacts of nuclear generating stations: Rancho Seco case study

    International Nuclear Information System (INIS)

    Bergmann, P.A.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Rancho Seco nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  10. Socio-economic impacts of nuclear generating stations: Peach Bottom case study

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Peach Bottom nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  11. Socio-economic impacts of nuclear generating stations: Oconee case study

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Oconee nuclear power stations. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  12. Socio-economic impacts of nuclear generating stations: D. C. Cook case study

    International Nuclear Information System (INIS)

    Branch, K.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the D. C. Cook nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  13. Socio-economic impacts of nuclear generating stations: Diablo Canyon case study

    International Nuclear Information System (INIS)

    Pijawka, K.D.; Yaquinto, G.

    1982-07-01

    This report documents a case study of the socioeconomic impacts of the construction and operation of the Diablo Canyon nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  14. Work-in-progress report on maintenance good practices for motors in nuclear power generating stations - Part 2

    International Nuclear Information System (INIS)

    Eckstein, E.R.; Hall, A.R.; Kasper, S.; Smith, P.R.; Subudhi, M.

    1988-01-01

    Motor maintenance is addressed by a variety of industry standards, utility procedures and manufacture's instructions, as well as by recently published assessments of nuclear and non-nuclear operating experience and motor reliability data. This experience supports the premise that motor failure rates are in large part related to application stress factors such as operating time, environmental factors and vibration. Due to the large number of critical motors installed in a nuclear generating station, additional considerations are necessary to effectively schedule their preventive maintenance activities. Therefore, in this part, a method for prioritizing motor maintenance based on application stresses experienced by the motors is presented

  15. Design and verification of computer-based reactor control system modification at Bruce-A candu nuclear generating station

    International Nuclear Information System (INIS)

    Basu, S.; Webb, N.

    1995-01-01

    The Reactor Control System at Bruce-A Nuclear Generating Station is going through some design modifications, which involve a rigorous design process including independent verification and validation. The design modification includes changes to the control logic, alarms and annunciation, hardware and software. The design (and verification) process includes design plan, design requirements, hardware and software specifications, hardware and software design, testing, technical review, safety evaluation, reliability analysis, failure mode and effect analysis, environmental qualification, seismic qualification, software quality assurance, system validation, documentation update, configuration management, and final acceptance. (7 figs.)

  16. Effect of Hurricane Andrew on the Turkey Point Nuclear Generating Station from August 20--30, 1992

    International Nuclear Information System (INIS)

    Hebdon, F.J.

    1993-03-01

    On August 24, 1992, Hurricane Andrew, a Category 4 hurricane, struck the Turkey Point Electrical Generating Station with sustained winds of 145 mph (233 km/h). This is the report of the team that the US Nuclear Regulatory Commission (NRC) and the Institute of Nuclear Power Operations (INPO) jointly sponsored (1) to review the damage that the hurricane caused the nuclear units and the utility's actions to prepare for the storm and recover from it, and (2) to compile lessons that might benefit other nuclear reactor facilities

  17. Effect of Hurricane Andrew on the Turkey Point Nuclear Generating Station from August 20--30, 1992. [Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hebdon, F.J. [Institute of Nuclear Power Operations, Atlanta, GA (United States)

    1993-03-01

    On August 24, 1992, Hurricane Andrew, a Category 4 hurricane, struck the Turkey Point Electrical Generating Station with sustained winds of 145 mph (233 km/h). This is the report of the team that the US Nuclear Regulatory Commission (NRC) and the Institute of Nuclear Power Operations (INPO) jointly sponsored (1) to review the damage that the hurricane caused the nuclear units and the utility`s actions to prepare for the storm and recover from it, and (2) to compile lessons that might benefit other nuclear reactor facilities.

  18. Safety Evaluation Report related to the operation of Hope Creek Generating Station (Docket No. 50-354)

    International Nuclear Information System (INIS)

    1984-10-01

    The Safety Evaluation Report for the application filed by Public Service Electric and Gas Company, as applicant, for a license to operate the Hope Creek Generating Station (Docket No. 50-354), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Salem County, New Jersey. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  19. Safety Evaluation Report related to the operation of Hope Creek Generating Station (Docket No. 50-354). Supplement No. 1

    International Nuclear Information System (INIS)

    1985-03-01

    Supplement No. 1 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company as applicant for itself and Atlantic City Electric Company, as owners, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  20. Safety Evaluation Report related to the operation of Hope Creek Generating Station (Docket No. 50-354). Supplement No. 4

    International Nuclear Information System (INIS)

    1985-12-01

    Supplement No. 4 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company on its own behalf as co-owner and as agent for the other co-owner, the Atlantic City Electric Company, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  1. Safety Evaluation Report related to the operation of Hope Creek Generating Station (Docket No. 50-354)

    International Nuclear Information System (INIS)

    1985-10-01

    Supplement No. 3 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company on its own behalf as co-owner and as agent for the other co-owner, the Atlantic City Electric Company, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report. 6 tabs

  2. Technical evaluation of RETS-required reports for Rancho Seco Nuclear Generating Station, Unit 1 for 1983

    International Nuclear Information System (INIS)

    Magleby, E.H.; Young, T.E.

    1985-01-01

    A review of the reports required by Federal regulations and the plant-specific Radiological Effluent Technical Specifications (RETS) for operations conducted during 1983 was performed. The periodic reports reviewed for the Rancho Seco Nuclear Generating Station, Unit 1 were the Semiannual Effluent Release Report, January 1, 1983 to June 30, 1983 and the Radiation Exposure, Environmental Protection, Effluent and Waste Disposal Report. The principal review guidelines were the plant's specific RETS which were based on NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  3. Safety evaluation report related to the operation of Hope Creek Generation Station (Docket No. 50-354). Supplement No. 5

    International Nuclear Information System (INIS)

    1986-04-01

    Supplement No. 5 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company on its own behalf as co-owner and as agent for the other co-owner, the Atlantic City Electric Company, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that had not been resolved at the time of the publication of the Safety Evaluation Report

  4. Safety evaluation report related to the operation of Hope Creek Generating Station (Docket No. 50-354). Supplement 2

    International Nuclear Information System (INIS)

    1985-08-01

    Supplement No. 2 to the Safety Evaluation Report on the application filed by Public Service Electric and Gas Company as applicant for itself and Atlantic City Electric Company, as owners, for a license to operate Hope Creek Generating Station has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lower Alloways Creek Township in Salem County, New Jersey. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  5. Surry Power Station secondary water chemistry improvement since steam generator replacement and the unit two feedwater pipe rupture

    International Nuclear Information System (INIS)

    Swindell, E.T.

    1988-01-01

    Surry Power Station has two Westinghouse-designed three-loop PWRs of 811 MWe design rating. The start of commercial operation was in July, 1972 in No.1 plant, and May, 1973 in No.2 plant. Both plants began the operation using controlled phosphate chemistry for the steam generators. In 1975, both plants were converted to all volatile treatment on the secondary side due to the tube wall thinning corrosion in the steam generators, which was associated with the phosphate sludge that was building up on the tube sheets and created acidic condition. Thereafter, condenser and air leakage and steam generator denting occurred, and after the operation of 8 years 2 month of No.1 plant and 5 years 9 months of No.2 plant, the steam generators were replaced. A major plant improvement program was designed and implemented from 1979 to 1980. The improvement in new steam generators, the modification for preventing corrosion, the addition of a steam generator blowdown recovery system, the reconstruction of condensers, the installation of full flow, deep bed condensate polishers, the addition of Dionex 8,000 on-line ion chromatograph, a long term maintenance agreement with Westinghouse and so on are reported. (Kako, I.)

  6. Water-related constraints to the development of geothermal electric generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Robertson, R.C.; Shepherd, A.D.; Rosemarin, C.S.; Mayfield, M.W.

    1981-06-01

    The water-related constraints, which may be among the most complex and variable of the issues facing commercialization of geothermal energy, are discussed under three headings: (1) water requirements of geothermal power stations, (2) resource characteristics of the most promising hydrothermal areas and regional and local water supply situations, and (3) legal issues confronting potential users of water at geothermal power plants in the states in which the resource areas are located. A total of 25 geothermal resource areas in California, New Mexico, Oregon, Idaho, Utah, Hawaii, and Alaska were studied. Each had a hydrothermal resource temperature in excess of 150/sup 0/C (300/sup 0/F) and an estimated 30-year potential of greater than 100-MW(e) capacity.

  7. Generating a representative signal of coal moisture content to anticipate combustion control in thermal power stations

    Energy Technology Data Exchange (ETDEWEB)

    Prieto-Fernandez, Ismael; Luengo-Garcia, J. Carlos; Alonso-Hidalgo, Manuela; Ponte-Gutierrez, Daniel [Area de Maquinas y Motores Termicos, Universidad de Oviedo, Campus Universitario s/n 33203, Asturias Gijon (Spain)

    2002-06-01

    This article describes the possibilities of continuously measuring coal moisture in the boiler feeding circuit of a thermal power station so that the measurement can be used as a signal for the boiler combustion control system. To do so, in the first place, the point through which coal would be fed into the boiler was chosen. After studying the different parts of the circuit, the feeder was selected. Then, an installation was designed, at semi-industrial scale, faithfully reproducing the operation of a belt conveyor. In order to measure the moisture content, a microwave system was installed, and a large number of coal samples with different ranks and grain sizes was tested showing eventually the likelihood of the objective.

  8. Formal on-the-job training programs at power generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Hoch, R.R. [HGS, Inc., Ellicott City, MD (United States)

    1996-11-01

    On-the-Job Training (OJT) should be utilized for all posts in the stations. OJT for entry level positions should include training in many mundane areas that are often overlooked such as record keeping (log sheets and log books), proper communications and how to conduct himself or herself on the watch, during either emergency or routine situations. A separate OJT Program should be provided to prepare personnel to qualify for promotion to the next level. (Depending on any common agreements or bargaining unit contracts, OJT Programs can also be used to pre-qualify candidates for promotion to the next level.) By allowing the trainee to retain all OJT Program materials, it will also be available to him or her for continued reference or remedial training. (When an OJT Program is first instituted, it may be validated by issuing it to incumbent personnel and, subsequent, incorporating their comments or corrections.) This paper describes a formal OJT program.

  9. IEEE Std 650-1990: IEEE standard for qualification of Class 1E static battery chargers and inverters for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Methods for qualifying static battery chargers and inverters for Class 1E installations in a mild environment outside containment in nuclear power generating stations are described. The qualification methods set forth employ a combination of type testing and analysis, the latter including a justification of methods, theories, and assumptions used. These procedures meet the requirements of IEEE Std 323-1983, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations

  10. Analysis of the efficiency and effectiveness of distributed generation in the power station (fuel) Sancti Spiritus

    International Nuclear Information System (INIS)

    Castro Álvarez, Alfredo; Pérez Pérez, Osvaldo; Bravo Amarante, Edelvy

    2015-01-01

    The severe crisis in the National Electric System (SEN) suffered by Cuba in the late 90's and early 2000 forced to change the design to keep the generation matrix supported in large plants towards where distributed generation small plants throughout the country, the state assumed demand and residential sector. From tools frequently used to evaluate the quality of processes (Scatter diagram, Pareto diagram, Ishikawa diagram and function quality loss Taguchi) was evaluated from indicators index fuel consumption and availability, efficiency and effectiveness of the generation process identifying areas within the plant that the greatest impact on the deviation of both indicators and the impact generated in the services, the economy and the environment. To develop this evaluation the operating data of the years 2012, 2013 and 2014 of the power plant were taken Sancti Spiritus. (full text)

  11. Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Phase 1, Study

    International Nuclear Information System (INIS)

    Hoopingarner, K.R.; Vause, J.W.; Dingee, D.A.; Nesbitt, J.F.

    1987-08-01

    Pacific Northwest Laboratory evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume I, reviews diesel-generator experience to identify the systems and components most subject to aging degradation and isolates the major causes of failure that may affect future operational readiness. Evaluations show that as plants age, the percent of aging-related failures increases and failure modes change. A compilation is presented of recommended corrective actions for the failures identified. This study also includes a review of current, relevant industry programs, research, and standards. Volume II reports the results of an industry-wide workshop held on May 28 and 29, 1986 to discuss the technical issues associated with aging of nuclear service emergency diesel generators

  12. Assessment of whether upstream passage for Lake Sturgeon is needed at the Pointe du Bois Generating Station (Winnipeg River)

    International Nuclear Information System (INIS)

    Pratt, T.

    2010-01-01

    This document reviewed Manitoba Hydro's proposal to modernize the Pointe du Bois Generating Station (GS) on the Winnipeg River, with particular reference to the potential impacts on Lake Sturgeon in Management Unit 5 (MU5) where large numbers of the fish spawn at the base of the falls. The modernization will involve replacing the spillway, dam segments and replacing or repairing the powerhouse. The pros and cons of providing upstream fish passage for Lake Sturgeon and the generating station were outlined. The only spawning area in the MU5 area may be altered considerably due to changes in water flow, depending on the design chosen for modernization. A potential benefit of providing upstream fish passage for Lake Sturgeon would be to increase genetic diversity within the Winnipeg River. Another potential benefit would be to allow Lake Sturgeon, from the relatively dense population below the GS, to move upstream into MU4 where unfilled habitat may be available and Lake Sturgeon abundance is lower. A potential disadvantage of providing fish passage would be the loss of individual Lake Sturgeon from the healthy population in MU5 with no accompanying benefit to MU4. There would be no net gain to MU4 or MU5 if migrating Lake Sturgeon returned to MU5 rather than proceeding upstream. It was concluded that these current gaps in knowledge must be filled in order to fully assess the environmental impacts. 2 figs.

  13. Iron turbidity removal from the active process water system of the Kaiga Generating Station Unit 1 using an electrochemical filter

    International Nuclear Information System (INIS)

    Venkateswaran, G.; Gokhale, B.K.

    2007-01-01

    Iron turbidity is observed in the intermediate cooling circuit of the active process water system (APWS) of Kaiga Generating Station (KGS). Deposition of hydrous/hydrated oxides of iron on the plate type heat exchanger, which is employed to transfer heat from the APWS to the active process cooling water system (APCWS), can in turn result in higher moderator D 2 O temperatures due to reduced heat transfer. Characterization of turbidity showed that the major component is γ-FeOOH. An in-house designed and fabricated electrochemical filter (ECF) containing an alternate array of 33 pairs of cathode and anode graphite felts was successfully tested for the removal of iron turbidity from the APWS of Kaiga Generating Station Unit No. 1 (KGS No. 1). A total volume of 52.5 m 3 water was processed using the filter. At an average inlet turbidity of 5.6 nephelometric turbidity units (NTU), the outlet turbidity observed from the ECF was 1.6 NTU. A maximum flow rate (10 L . min -1 ) and applied potential of 18.0-20.0 V was found to yield an average turbidity-removal efficiency of ∝ 75 %. When the experiment was terminated, a throughput of > 2.08 . 10 5 NTU-liters was realized without any reduction in the removal efficiency. Removal of the internals of the filter showed that only the bottom 11 pairs of felts had brownish deposits, while the remaining felts looked clean and unused. (orig.)

  14. Investigations of the gas-side heat transfer and flow characteristics of steam generators in AGR stations

    Energy Technology Data Exchange (ETDEWEB)

    Lis, J [Central Electricity Research Laboratories, Leatherhead, Surrey (United Kingdom)

    1984-07-01

    This paper describes the experimental and analytical investigations of the gas-side heat transfer and flow characteristics of steam generators in the AGR stations carried out by CERL. The majority of the experimental work on heat transfer and flow characteristics of close-packed tube arrangements in cross-flow of gases is carried out in a pressurised heat exchanger rig. The rig is operated on-line by a dedicated PDP 11/40 computer over the range of Reynolds number 10{sup 4} to 3x10{sup 5}. Atmospheric wind tunnels employing either small or large scale models of the specific sections of steam generators are used for a variety of supplementary and development studies. Various measurements techniques and, in particular, LDA and hot wire anemometry employed in these studies are described. The more important aspects of various investigations are illustrated by typical results. In order to ensure the efficient operation and integrity of steam generators under asymmetric boundary conditions a MIX suite of 2-dimensional codes has been developed. The codes calculate the gas and water/steam flow and temperature distributions in each channel of the steam generator taking into account thermal mixing in the gas as it passes through the generator. Application of the MIX codes to the solution of various operational problems is illustrated by typical examples and the continuing exercise of validating the codes against plant operational data is discussed. (author)

  15. Investigations of the gas-side heat transfer and flow characteristics of steam generators in AGR stations

    International Nuclear Information System (INIS)

    Lis, J.

    1984-01-01

    This paper describes the experimental and analytical investigations of the gas-side heat transfer and flow characteristics of steam generators in the AGR stations carried out by CERL. The majority of the experimental work on heat transfer and flow characteristics of close-packed tube arrangements in cross-flow of gases is carried out in a pressurised heat exchanger rig. The rig is operated on-line by a dedicated PDP 11/40 computer over the range of Reynolds number 10 4 to 3x10 5 . Atmospheric wind tunnels employing either small or large scale models of the specific sections of steam generators are used for a variety of supplementary and development studies. Various measurements techniques and, in particular, LDA and hot wire anemometry employed in these studies are described. The more important aspects of various investigations are illustrated by typical results. In order to ensure the efficient operation and integrity of steam generators under asymmetric boundary conditions a MIX suite of 2-dimensional codes has been developed. The codes calculate the gas and water/steam flow and temperature distributions in each channel of the steam generator taking into account thermal mixing in the gas as it passes through the generator. Application of the MIX codes to the solution of various operational problems is illustrated by typical examples and the continuing exercise of validating the codes against plant operational data is discussed. (author)

  16. The feature of emergency diesel generator relaying protection in Tianwan nuclear power station

    International Nuclear Information System (INIS)

    Jiang Xiaopeng; Shi Yan; Li Cong

    2014-01-01

    This paper mainly introduces the function and feature of emergency diesel generator in nuclear power plant, which plays an important role in nuclear accident. It minutely tells about the feature and configuration of relay protection and discusses the rationality of protection scheme, which shows that it can be completely contented all kinds of operation states. It is an analysis and argument about the principle of relay protection in detail, that would operate correctly when emergency diesel generator be in abnormal operating and serious fault conditions, such as cut off emergency diesel generator in order to avoid more harm to emergency diesel generator. It analyzes how the relay responses quickly and locks up the protection action under perturbations in the external power, so it can avoid unnecessary resection of emergency diesel generator to emergency power supply loss and effect of nuclear safety. It also analyzes the flexible use of protection setting of the protective relay to meet various operating status. It elaborates the particularity of relay protection which is due to the particularity of nuclear safety. It analyses the possibility of relay protection which has to be applied to other equipment and the protection setting that was provided by design institute, and puts forward the author's viewpoints. (authors)

  17. FY15 Status Report: CIRFT Testing of Spent Nuclear Fuel Rods from Boiler Water Reactor Limerick

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jy-An John [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wang, Hong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Jiang, Hao [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-06-01

    The objective of this project is to perform a systematic study of used nuclear fuel (UNF, also known as spent nuclear fuel [SNF]) integrity under simulated transportation environments using the Cyclic Integrated Reversible-Bending Fatigue Tester (CIRFT) hot-cell testing technology developed at Oak Ridge National Laboratory (ORNL) in August 2013. Under Nuclear Regulatory Commission (NRC) sponsorship, ORNL completed four benchmark tests, four static tests, and twelve dynamic or cycle tests on H. B. Robinson (HBR) high burn-up (HBU) fuel. The clad of the HBR fuels was made of Zircaloy-4. Testing was continued in fiscal year (FY) 2014 using Department of Energy (DOE) funds. The additional CIRFT was conducted on three HBR rods (R3, R4, and R5) in which two specimens failed and one specimen was tested to over 2.23 10⁷ cycles without failing. The data analysis on all the HBR UNF rods demonstrated that it is necessary to characterize the fatigue life of the UNF rods in terms of (1) the curvature amplitude and (2) the maximum absolute of curvature extremes. The maximum extremes are significant because they signify the maximum of tensile stress for the outer fiber of the bending rod. CIRFT testing has also addressed a large variation in hydrogen content on the HBR rods. While the load amplitude is the dominant factor that controls the fatigue life of bending rods, the hydrogen content also has an important effect on the lifetime attained at each load range tested. In FY 15, ten SNF rod segments from BWR Limerick were tested using ORNL CIRFT, with one under static and nine dynamic loading conditions. Under static unidirectional loading, a moment of 85 N·m was obtained at maximum curvature 4.0 m⁻¹. The specimen did not show any sign of failure in three repeated loading cycles to almost same maximum curvature. Ten cyclic tests were conducted with amplitude varying from 15.2 to 7.1 N·m. Failure was observed in nine of the tested rod specimens. The cycles to failure were

  18. Experiences from Loviisa Nuclear Power Station concerning the decontamination of steam generators and primary system components

    International Nuclear Information System (INIS)

    Jaernstroem, R.

    1989-01-01

    Loviisa 1 and 2 are 465 MWe PWR units of the Soviet type VVER-440. Loviisa 1 has been in commercial operation since spring 1977 and Loviisa 2 from the beginning of 1980. Decontamination of primary circuit components - even big ones as steam generators - can be performed in an efficient and quick way with good results and resonable expences. Total costs for decontamination of the two steam generators including planning, construction, documentation, operation, chemicals etc. did not rise above 100,000.00 dollars. (author) 6 figs., 2 tabs

  19. Evaluation of Electrochemically Generated Potable Water Disinfectants for Use on the International Space Station

    Science.gov (United States)

    Rodriquez, Branelle; Anderson, Molly; Adams, Niklas; Vega, Leticia; Botkin, Douglas

    2013-01-01

    Microbial contamination and subsequent growth in spacecraft water systems are constant concerns for missions involving human crews. The current potable water disinfectant for the International Space Station (ISS) is iodine; however, with the end of the Space Shuttle Program, there is a need to develop redundant biocide systems that do not require regular up-mass dependencies. Throughout the course of a year, four different electrochemical systems were investigated as a possible biocide for potable water on the ISS. Research has indicated that a wide variability exists with regards to efficacy in both concentration and exposure time of these disinfectants; therefore, baseline efficacy values were established. This paper describes a series of tests performed to establish optimal concentrations and exposure times for four disinfectants against single and mixed species planktonic and biofilm bacteria. Results of the testing determined whether these electrochemical disinfection systems are able to produce a sufficient amount of chemical in both concentration and volume to act as a biocide for potable water on the ISS.

  20. Nuclear power generating station operability assurance reliability, availability, and maintainability application for maintenance management

    International Nuclear Information System (INIS)

    Cleveland, J.W.; Regenie, T.R.; Wilson, R.J.

    1985-01-01

    Environmental qualification and equipment warrantee insurance stipulations should be supplemented with a reliable maintainability program structured to identify and control fast failing subcomponents within critical equipment. Anticipation of equipment subcomponent failures can control unnecessary plant off-line occurrences. Incorporation of reliability, availability, and maintainability considerations into plant maintenance policies on power generation and safety related items have positive cost benefit advantages

  1. Fort St. Vrain Nuclear Generating Station. Semiannual operations report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    The reactor was in start-up testing during this period. Information is presented concerning fuel and equipment performance; changes in facility design; procedures; testing; staff; licensed operator training; surveillance; power generation; maintenance; shutdowns, primary coolant chemistry; radiation exposure; fission product release; solid wastes; and radioactive effluents

  2. LM5000 gas turbine generating plant for Tenaga Nasional Berhad Sultan Salahuddin Abdul Aziz power station (Malaysia)

    Energy Technology Data Exchange (ETDEWEB)

    Ishizuka, T.; Shioya, Y.; Furuya, M.; Saito, K. [Ishikawajima-Harima Heavy Indutries Co. Ltd., Tokyo (Japan)

    1995-01-01

    The LM5000 gas turbine generating plant (35,000 kW) for Tenaga Nasional Berhad Sultan Salahuddin Abdul Aziz Power Station (Malaysia) was outlined. The lightweight power turbine of 16 ton was adopted to reduce an on-site installation time, and integrated into a single package together with the gas generator, while all the auxiliary units were assembled completely before delivery. Because the plant was for peak cut use, the hydraulic starting unit was adopted, in particular, considering starting operation, and the diesel engine generator was provided to drive the unit in complete power failure. The reliability of operation and monitoring was also enhanced by triplicated digital control. The plant output capacity was well beyond the required one during actual operation, and the thermal efficiency of 36.0-36.3% was obtained. Because the power plant was installed in the rainy western part of Malaysia, protective measures of the plant from rain were taken into careful consideration, for example, the air intake port of the air-cooled generator was faced downward, and provided with a condensation eliminator. 4 figs.

  3. Monitoring equipment environment during nuclear plant operation at Salem and Hope Creek generating stations

    International Nuclear Information System (INIS)

    Blum, A.; Smith, R.J.

    1991-01-01

    Monitoring of environmental parameters has become a significant issue for operating nuclear power plants. While the long-term benefits of plant life extension programs are being pursued with comprehensive environmental monitoring programs, the potential effect of local hot spots at various plant locations needs to be evaluated for its effect on equipment degradation and shortening of equipment qualified life. A significant benefit can be experienced from temperature monitoring when a margin exists between the design versus actual operating temperature. This margin can be translated into longer equipment qualified life and significant reduction in maintenance activities. At PSE and G, the immediate need for monitoring environmental parameters is being accomplished via the use of a Logic Beach Bitlogger. The Bitlogger is a portable data loggings system consisting of a system base, input modules and a communication software package. Thermocouples are installed on selected electrical equipment and cables are run from the thermocouples to the input module of the Bitlogger. Temperature readings are taken at selected intervals, stored in memory, and downloaded periodically to a PC software program, i.e., Lotus. The data is formatted into tabular or graphical documents. Because of their versatility, Bitloggers are being used differently at the authors Nuclear facility. At the Salem Station (2 Units-4 loop Westinghouse PWR), a battery powered, fully portable, calibrated Bitlogger is located in an accessible area inside Containment where it monitors the temperature of various electrical equipment within the Pressurizer Enclosure. It is planned that close monitoring of the local hot spot temperatures in this area will allow them to adjust and reconcile the environmental qualification of the equipment

  4. Commercialization of new energy technologies. Appendix A. Case study 1: central station electric power generation technologies

    International Nuclear Information System (INIS)

    1976-06-01

    The results of a survey on Technologies for Central Power Generation are presented. The central power generation technologies selected for consideration were: fusion; breeder reactors; solar electric (thermal); geothermal; and magnetohydrodynamics. The responses of industry executives who make key investment decisions concerning new energy technologies and who to identify the problems faced in the development and commercialization of new energy systems are presented. Evaluation of these responses led to the following recommendations: increase industry input into the R, D and D planning process; establish and advocate priorities for new technologies based on detailed analysis of a technology's value in terms of overall national goals; create a mechanism for a joint ERDA/industry appraisal of priorities and programs; increase level of federal funding or subsidy of new technology demonstrations; and focus the activities of the national laboratories on basic research and very early product development; and emphasize industry involvement in systems development

  5. Steam generator materials and secondary side water chemistry in nuclear power stations

    International Nuclear Information System (INIS)

    Rudelli, M.D.

    1979-04-01

    The main purpose of this work is to summarize the European and North American experiences regarding the materials used for the construction of the steam generators and their relative corrosion resistance considering the water chemestry control method. Reasons underlying decision for the adoption of Incoloy 800 as the material for the secondary steam generator system for Atucha I Nuclear Power Plant (Atucha Reactor) and Embalse de Rio III Nuclear Power Plant (Cordoba Reactor) are pointed out. Backup information taken into consideration for the decision of utilizing the All Volatil Treatment for the water chemistry control of the Cordoba Reactor is detailed. Also all the reasonswhich justify to continue with the congruent fosfatic method for the Atucha Reactor are analyzed. Some investigation objectives which would eventually permit the revision of the decisions taken on these subjects are proposed. (E.A.C.) [es

  6. Application of best estimate and uncertainty safety analysis methodology to loss of flow events at Ontario's Power Generation's Darlington Nuclear Generating Station

    International Nuclear Information System (INIS)

    Huget, R.G.; Lau, D.K.; Luxat, J.C.

    2001-01-01

    Ontario Power Generation (OPG) is currently developing a new safety analysis methodology based on best estimate and uncertainty (BEAU) analysis. The framework and elements of the new safety analysis methodology are defined. The evolution of safety analysis technology at OPG has been thoroughly documented. Over the years, the use of conservative limiting assumptions in OPG safety analyses has led to gradual erosion of predicted safety margins. The main purpose of the new methodology is to provide a more realistic quantification of safety margins within a probabilistic framework, using best estimate results, with an integrated accounting of the underlying uncertainties. Another objective of the new methodology is to provide a cost-effective means for on-going safety analysis support of OPG's nuclear generating stations. Discovery issues and plant aging effects require that the safety analyses be periodically revised and, in the past, the cost of reanalysis at OPG has been significant. As OPG enters the new competitive marketplace for electricity, there is a strong need to conduct safety analysis in a less cumbersome manner. This paper presents the results of the first licensing application of the new methodology in support of planned design modifications to the shutdown systems (SDSs) at Darlington Nuclear Generating Station (NGS). The design modifications restore dual trip parameter coverage over the full range of reactor power for certain postulated loss-of-flow (LOF) events. The application of BEAU analysis to the single heat transport pump trip event provides a realistic estimation of the safety margins for the primary and backup trip parameters. These margins are significantly larger than those predicted by conventional limit of the operating envelope (LOE) analysis techniques. (author)

  7. Electrical Power Generated from Tidal Currents and Delivered to USCG Station Eastport, ME

    Science.gov (United States)

    2011-01-21

    35 Theory of Operation The ORPC Pre-Commercial Beta Turbine Generator Unit (“Beta TGU”) uses a hydrokinetic cross flow turbine based on Darrieus ...development in the wind turbine industry. The power coefficient (a measure of energy extraction effectiveness) is defined as follows: 31 2 turbine ...stream area of the device. Axial flow wind turbines have demonstrated power coefficients to an estimated 48% which approaches the theoretical “Betz

  8. Palo Verde Generating Station, Units 4 and 5. License application, general information

    International Nuclear Information System (INIS)

    1978-01-01

    A license application for two more Palo Verde reactors, Units 4 and 5, is presented. The two PWR reactors have a nominal net generating power each of 1,270 MW(e). Containments are steel-lined prestressed cylindrical structures with hemispherical domes. The reactors are replicas of Palo Verde 1, 2 and 3 (see DOCKETS 50528, 50529 and 50530) using the standard Combustion Engineering System 80 (see DOCKET-STN-50470)

  9. Marble Hill Nuclear Generating Station, Units 1 and 2. License application, PSAR, general information

    International Nuclear Information System (INIS)

    1975-01-01

    An application is presented for two PWR reactors to be constructed in Salud Township, Jefferson County, Indiana, about six miles northeast of New Washington on the Ohio River. Each unit will have a rated core power level of 3411 MW(t) with a corresponding electrical output of 1130 MW(e). Mechanical draft cooling towers will be provided. The facility, which will replicate the Byron facility will be employed for the generation of electricity for transmission, sale for resale, and distribution

  10. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  11. Design and construction features of steam generators at a nuclear power station

    International Nuclear Information System (INIS)

    Chakrabarti, A.K.; Gupta, K.N.; Bapat, C.N.; Sharma, V.K.

    1996-01-01

    The Indian nuclear power programme is based on Pressurised Heavy Water Reactors (PHWRs) using natural uranium as fuel and heavy water as reactor coolant as well as moderator. The nuclear heat is generated in the fuel located in the pressure tubes. Pressurised heavy water in the primary heat transport (PHT) system is circulated through the tubes which picks up the heat from the fuel and transfers it to ordinary water in steam generators (SGs) to produce steam. The steam is used for providing power to the turbine. The steam generator is a critical equipment in the nuclear steam supply system (NSSS) of a nuclear reactor. SG tube surface area constitute about 80% of total primary circuit surface area. A typical value in a 220 MWe reactor is 9000 m 2 which can release considerable amount of corrosion products unless very low corrosion rates are achieved by proper design, material selection and water chemistry control. Design and construction features of SGs are given. 1 tab

  12. Fulton Generating Station Units 1 and 2 (Docket Nos. 50-463 and 50-464): Final environmental statement

    International Nuclear Information System (INIS)

    1975-04-01

    The proposed action is the issuance of construction permits to the Philadelphia Electric Company for the construction of the Fulton Generating Station, Units 1 and 2, located in Fulton and Drumore Townships, Lancaster County, Pennsylvania. Makeup water for cooling will be withdrawn form Conowingo Pond at a maximum rate of 43,000 gpm. The dissolved solids content of the blowdown water will be increased by a factor of about two. The remainder of the water will be evaporated to the atmosphere by cooling towers. About 10 acres offsite, some 7 acres of which is woodland, will be used for railroad-spur construction. About 0.25 mile of new transmission-line rights-of-way (9 acres) will be needed, although 49 miles of new transmission line, which will require about 3 miles of selective clearing, will be constructed on existing rights-of-way. An unestablished amount of land will be used for access-road construction, but the applicant will use existing roadway corridors where feasible. A small loss of consumer species will result from loss of habitat. Some loss of benthic and pelagic organisms in Conowingo Pond will be caused by intake and discharge construction. The Station's thermal and chemical discharges will meet the State water-quality standards. The duration of additional ground-level fog caused by Station operation is expected to be less than 3 hr/year. (Sect. 5.3.3). No observable effects are expected from salt deposition from cooling-tower drift. (Sect. 5.3.3). Decomposers, primary producers, and zooplankton will be entrained and killed in the cooling-tower system; they, as well as benthic organisms, will be affected by the heated-water discharge. This loss will have little effect on the pond food web. 30 figs., 76 tabs

  13. An artificial intelligence heat rate/NOx optimization system for Ontario Hydro`s Lambton Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Bachalo, K.; Henrikson, J. [Ontario Hydro, Toronto, ON (Canada); Roland, W.; Booth, R.C.; Parikh, N.; Radl, B. [Pegasus Technologies Ltd., Painesville, OH (United States)

    1998-12-01

    The utilization of artificial Intelligence (AI)-based software programs to optimize power plant operations by simultaneously improving heat rate performance and reducing NOx emissions was discussed. While many AI programs were initially used for demonstration purposes, they are now available for commercial use due to their promising results. In 1996, the Fossil Business Unit of Ontario Hydro initiated a study to evaluate AI technology as a tool for optimizing heat rate and NOx reduction in coal fired stations. Tests were conducted at Units 3 and 4 of the Lambton Generation Station, located just south of Sarnia, Ontario. The tests were conducted to examine three desirable options: (1) achieve at least 0.5 per cent improvement in heat rate concurrently with a NOx reduction of at least 5 per cent, (2) optimize on `heat rate` only with minimum improvement of 2 per cent, and optimize `minimal NOx` only with reduction target of 20 per cent or more, and (3) reach a collaborative agreement with a supplier to further explore and develop AI optimization applications for other advanced and more complex plant processes. Results indicated that NOx reduction and heat rate improvement are not contradictory goals. 15 refs., 1 fig.

  14. EMI environment EMC considerations concerning equipment upgrades at a nuclear utility power generating station a case history

    International Nuclear Information System (INIS)

    Metcalf, M.J.

    1993-01-01

    As equipment is upgraded during scheduled power outages in nuclear power generating stations, more and more utilities will be faced with the problem of dealing with Electromagnetic Compatibility (EMC) issues that have evolved with the trend of manufacturers designing equipment based around state-of-the-art high technology logic devices. This paper lists Commonwealth Edison Company (CECO) equipment that was scrutinized by National Technical Systems (NTS) for its EMI impact. The test requirements and test procedures for assessing EMI and EMC are outlined. Although on-site mapping data was gathered to assist CECO for the upgrade described here of the Auxiliary Electric Equipment Room of a Westinghouse Eagle 21 Reactor Protection System at the Zion Unit No.1 Station, blanket mapping of every location for every upgrade is a short term, expensive solution to the EMI problem. It is concluded that the primary problem of lack of system and component level EMI specifications must be addressed by a governing body. 7 refs., 2 figs

  15. Environmental radiological studies downstream from the Rancho Seco Nuclear Power Generating Station, 1985

    International Nuclear Information System (INIS)

    Noshkin, V.E.; Wong, K.M.; Eagle, R.J.; Brunk, J.L.; Jokela, T.A.

    1986-01-01

    Information compiled in 1985 while assessing the environmental impact of radionuclides previously discharged with aqueous releases from the Rancho Seco Nuclear Power Generating Plant is presented. In October 1984, the quantities of gamma-emitting radionuclides in water discharged to Clay Creek from the plant were reduced below operationally defined detection limits for liquid effluents. However, radionuclides previously discharged persist in the downstream environment and are found in many aquatic dietary components. 134 Cs and 137 Cs are the primary gamma-emitting radionuclides detected in the edible flesh of different fish, crayfish, and frogs. Coefficients for exponential equations are generated, from a least square analysis, that relate the change in concentration of 137 Cs in fish to distance downstream and time between March and October 1985. Concentrations of 137 Cs in surface creek sediments also decreased in the downstream direction much in the same manner as concentrations decreased in fish. However, there was no significant difference in the radiocesium concentrations in surface sediements collected from comparable locations during both 1984 and 1985

  16. Critical evaluation of the nonradiological environmental technical specifications. Volume 4. San Onofre Nuclear Generating Station, Unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Cunningham, P.A.; Gray, D.D.; Kumar, K.D.

    1976-08-10

    A comprehensive study of the data collected as part of the environmental Technical Specifications program for Unit 1 of the San Onofre Nuclear Generating Station (SONGS 1) was conducted for the Office of Nuclear Regulatory Research of the U.S. Nuclear Regulatory Commission. The program included an analysis of the hydrothermal and ecological monitoring data collected during 1975. The hydrothermal analysis includes a discussion of models used in plume predictions prior to plant operation and an evaluation of the present hydrothermal monitoring program. The ecological evaluation was directed toward reviewing the strengths and weaknesses of the various sampling programs designed to monitor the planktonic, benthic, and nektonic communities inhabiting the inshore coastal area in the vicinity of San Onofre.

  17. IEEE Std 323-1983: IEEE standard for qualifying Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard describes the basic requirements for qualifying Class 1E equipment with interfaces that are to be used in nuclear power generating stations. The requirements presented include the principles, procedures, and methods of qualification. These qualification requirements, when met, will confirm the adequacy of the equipment design under normal, abnormal, design basis event, post design basis event, and in-service test conditions for the performance of safety function(s). The purpose of this standard is to identify requirements for the qualification of Class 1E equipment, including those interfaces whose failure could adversely affect the performance of Class 1E equipment and systems. The methods described shall be used for qualifying equipment, extending qualification, and updating qualification if the equipment is modified. Other issued IEEE standards which present qualification methods for specific equipment or components, or both, and those that deal with parts of the qualification program, may be used to supplement this standard, as applicable

  18. Critical evaluation of the nonradiological environmental technical specifications. Volume 4. San Onofre Nuclear Generating Station, Unit 1

    International Nuclear Information System (INIS)

    Adams, S.M.; Cunningham, P.A.; Gray, D.D.; Kumar, K.D.

    1976-01-01

    A comprehensive study of the data collected as part of the environmental Technical Specifications program for Unit 1 of the San Onofre Nuclear Generating Station (SONGS 1) was conducted for the Office of Nuclear Regulatory Research of the U.S. Nuclear Regulatory Commission. The program included an analysis of the hydrothermal and ecological monitoring data collected during 1975. The hydrothermal analysis includes a discussion of models used in plume predictions prior to plant operation and an evaluation of the present hydrothermal monitoring program. The ecological evaluation was directed toward reviewing the strengths and weaknesses of the various sampling programs designed to monitor the planktonic, benthic, and nektonic communities inhabiting the inshore coastal area in the vicinity of San Onofre

  19. An aerial radiological survey of the South Texas Project Electric Generating Station and surrounding area, Bay City, Texas

    International Nuclear Information System (INIS)

    Thompson, J.M.

    1988-12-01

    An aerial radiological survey was conducted over the South Texas Project Electric Generating Station (STPEGS) near Bay City, Texas, during the period 25 March to 4 April 1988. The purpose of the 259-square-kilometer (100-square-mile) survey was to document the terrestrial gamma environment of the plant and surrounding area. An exposure rate contour map at 1 meter above ground level (AGL) was constructed from the gamma data and overlaid on an aerial photograph and map of the area. Exposure rates were observed up to 10μR/h over land. No areas of enhanced exposure rates were observed. Ground-based exposure rate measurements and soil samples were obtained to support the aerial data. Oblique aerial photographs of the plant were also acquired during the survey. 9 refs., 4 figs., 1 tab

  20. Seismic structural fragility investigation for the San Onofre Nuclear Generating Station, Unit 1 (Project I); SONGS-1 AFWS Project

    International Nuclear Information System (INIS)

    Wesley, D.A.; Hashimoto, P.S.

    1982-04-01

    An evaluation of the seismic capacities of several of the San Onofre Nuclear Generating Station, Unit 1 (SONGS-1) structures was conducted to determine input to the overall probabilistic methodology developed by Lawrence Livermore National Laboratory. Seismic structural fragilities to be used as input consist of median seismic capacities and their variabilities due to randomness and uncertainty. Potential failure modes were identified for each of the SONGS-1 structures included in this study by establishing the seismic load-paths and comparing expected load distributions to available capacities for the elements of each load-path. Particular attention was given to possible weak links and details. The more likely failure modes were screened for more detailed investigation

  1. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  2. Radiological study of the sludge generated in a station drinking water treatment

    International Nuclear Information System (INIS)

    Baeza, A.; Salas, A.; Gragera, J.

    2011-01-01

    The purification process involves removing the water or at least reducing the legally permitted levels of undesirable substances that become part of the precipitates that originate, called sludge. The importance of the study is given because it will find, in the event that the process effectively reduce its radioactive contents, significant activities of the radionuclides eliminated. In this sense, the concentration of radioactive sludge and, above all, the chemical forms in which these radionuclides are retained condition the danger of the waste produced on the basis of their potential availability. In this study, we analyzed the sludge generated in a water treatment plant that has operated under both routine operation and in conditions designed to optimize the reduction of the radioactive contents for uranium and radium present in the treated water. (Author)

  3. Remote multiplexing system application to a nuclear generating station--An update

    International Nuclear Information System (INIS)

    Mazzoni, O.S.; Cava, A.L.; Bijoor, G.D.; Wiitala, M.F.

    1979-01-01

    Washington Public Power Supply System's Nuclear Power Plant WNP-2 is a 1200 MW, boiling water reactor (BWR) nuclear generating facility now under construction at Hanford, Washington. An early study indicated that substantial savings in cost could be obtained by the substitution of the Remote Multiplexing System (RMS) for the control and signal wiring between the Control Building and the outside facilities, which required long cable runs. It is a high speed, data system providing time-sharing digital communication. The purpose of this paper is to give the details of the RMS used in the WNP-2 project. It discusses the qualification requirements for Class IE systems and includes the description of the tests on the system

  4. The costs of generating electricity in nuclear and coal fired power stations

    International Nuclear Information System (INIS)

    Petroll, M.

    1984-01-01

    An ad-hoc group of experts for international comparison of electricity generation cost was established in the OECD more than two years ago. This group of experts submitted their report of results in English at the end of last year. This paper publishes an abbreviated version making use of original quotations exclusively in order to keep true to the content of the study as much as possible. The study arrives at the following conclusion: ''There is no uniform set of input data for nuclear and coalfired power plants and assumptions concerning the base parameters of the reactor differ from country to country. Despite these differences, the outcome is that, nuclear energy is cheaper than coal in all countries concerned with the exception of some parts of the United States and Canada.'' (orig./UA) [de

  5. Floating nuclear power station of APWS-80 type for electricity generation and fresh water production

    International Nuclear Information System (INIS)

    Zverev, K.V.; Polunichev, V.I.; Sergeev, Yu.A.

    1997-01-01

    To solve the problem of seawater desalination and electric energy generation, the designing organizations of Russia have developed two variants of floating nuclear desalination plant. The KLT-40 type reactors, with maximum 160 MW thermal power, is used as the power source for such plant. Depending on the customer requirement one or two power unit could be installed in the floating desalination plant. There are APWS-80 with two reactors, producing 80,000 m 3 desalinated water per day and APWS-40 with one reactor, producing 40,000 m 3 desalinated water per day. The advantages of floating desalination plants are the possibility to build and test them at the ship-build plant of the supplier country and to hand them over on turnkey base. (author). 5 figs

  6. Severe accident analysis of a steam generator tube rupture accident using MAAP-CANDU to support level 2 PSA for the Point Lepreau Generating Station Refurbishment Project

    Energy Technology Data Exchange (ETDEWEB)

    Petoukhov, S.M.; Brown, M.J. [Canadian Nuclear Laboratories, Chalk River, ON (Canada)

    2015-07-01

    A Level 2 Probabilistic Safety Assessment was performed for the Point Lepreau Generating Station. The MAAP-CANDU code was used to simulate the progression of postulated severe core damage accidents and fission product releases. This paper discusses the results for the reference case of the Steam Generator Tube Rupture initiating event. The reference case, dictated by the Level 2 Probabilistic Safety Assessment, was extreme and assumed most safety-related plant systems were not available: all steam generator feedwater; the emergency water supply; the moderator, shield and shutdown cooling systems; and all stages of emergency core cooling. The reference case also did not credit any post Fukushima lessons or any emergency mitigating equipment. The reference simulation predicted severe core damage beginning at 3.7 h, containment failure at 6.4 h, moderator boil off by 8.2 h, and calandria vessel failure at 42 h. A total release of 5.3% of the initial inventory of radioactive isotopes of Cs, Rb and I was predicted by the end of the simulation (139 h). Almost all noble gas fission products were released to the environment, primarily after the containment failure. No hydrogen/carbon monoxide burning was predicted. (author)

  7. Assessment of the once-through cooling alternative for central steam-electric generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Paddock, R. A.; Ditmars, J. D.

    1978-12-01

    The efficacy of the disposal of waste heat from steam-electric power generation by means of once-through cooling systems was examined in the context of the physical aspects of water quality standards and guidelines for thermal discharges. Typical thermal standards for each of the four classes of water bodies (rivers, lakes, estuaries, and coastal waters) were identified. The mixing and dilution characteristics of various discharge modes ranging from simple, shoreline surface discharges to long, submerged multiport diffusers were examined in terms of the results of prototype measurements, analytical model predictions, and physical model studies. General guidelines were produced that indicate, for a given plant capacity, a given type of receiving water body, and a given discharge mode, the likelihood that once-through cooling can be effected within the restrictions of typical thermal standards. In general, it was found that shoreline surface discharges would not be adequate for large power plants (greater than or equal to 500 MW) at estuarine and marine coastal sites, would be marginally adequate at lake sites, and would be acceptable only at river sites with large currents and river discharges. Submerged multiport diffusers were found to provide the greatest likelihood of meeting thermal standards in all receiving water environments.

  8. Assessment of the once-through cooling alternative for central steam-electric generating stations

    International Nuclear Information System (INIS)

    Paddock, R.A.; Ditmars, J.D.

    1978-12-01

    The efficacy of the disposal of waste heat from steam-electric power generation by means of once-through cooling systems was examined in the context of the physical aspects of water quality standards and guidelines for thermal discharges. Typical thermal standards for each of the four classes of water bodies (rivers, lakes, estuaries, and coastal waters) were identified. The mixing and dilution characteristics of various discharge modes ranging from simple, shoreline surface discharges to long, submerged multiport diffusers were examined in terms of the results of prototype measurements, analytical model predictions, and physical model studies. General guidelines were produced that indicate, for a given plant capacity, a given type of receiving water body, and a given discharge mode, the likelihood that once-through cooling can be effected within the restrictions of typical thermal standards. In general, it was found that shoreline surface discharges would not be adequate for large power plants (greater than or equal to 500 MW) at estuarine and marine coastal sites, would be marginally adequate at lake sites, and would be acceptable only at river sites with large currents and river discharges. Submerged multiport diffusers were found to provide the greatest likelihood of meeting thermal standards in all receiving water environments

  9. An introduction to the installation of Unit 5 at Revelstoke Generating Station

    International Nuclear Information System (INIS)

    1994-07-01

    The Revelstoke hydroelectric power plant in British Columbia has four generating units with a total capacity of 1843 MW. The plant was designed as a six-unit facility, with space provided in the powerhouse for two additional units in Bays 5 and 6. It is proposed to install a fifth unit at Revelstoke, which will increase capacity by ca 460 MW. No additional land or transmission facilities will be required for this project, whose estimated direct construction cost is $90 million. The new unit is felt to be needed because of anticipated capacity shortfalls that could occur on the British Columbia Hydro system as early as 1996 or as late as 2004. Preliminary engineering and environmental studies are reviewed, and the public consultation program and procurement plan for the project are outlined. Potential impacts on land use and heritage resources appear negligible, and recreation use of Revelstoke Reservoir is not expected to be significantly impacted. Changes in reservoir fluctuations with Unit 5 in place will be minimal. 4 figs

  10. The Burrard utilization study report: Review and analysis of the future role of Burrard Thermal Generating Station

    International Nuclear Information System (INIS)

    1993-01-01

    The Burrard Thermal Generating Station is located at Port Moody, British Columbia, and burns natural gas to supply steam to six turbine units for generating up to 912 MW of electricity. The Burrard plant accounts for ca 8.7% of the provincial generating capability. Burrard is expected to continue to fill a vital role as a supplier of displaceable firm energy to the British Columbia Hydro system. In parallel with a renewed focus on Burrard from a system planning perspective, there have also been concerns about air pollution from the plant in the context of its possible effect on the region's air quality. To address this and other issues surrounding Burrard's future, B.C. Hydro established a project team to conduct a utilization study. The team's work focused on the role of Burrard in providing a reliable and profitable role in electricity generation, the options for dealing with the air quality issue, and the implications of choosing one option over another. The team examined a wide range of issues including the remaining useful productive life of the plant, air quality, emissions reduction technologies, long-term gas prices and availability, and seismic stability of the plant. Key findings and recommendations of the study team are reviewed. A financial analysis showed that operating the plant in the displaceable firm energy mode is clearly superior to shutting the plant down and $100 million superior to operation in the full baseload mode. Selective catalytic reduction technology applied to at least the first four of the plant units is the favored option for ensuring better air quality. The value of Burrard would be increased further if its availability factor could be increased to 85%. 7 figs., 3 tabs

  11. Aerial radiological survey of the Palo Verde Nuclear Generating Station and surrounding area, Wintersburg, Arizona. Date of survey: November 1982

    International Nuclear Information System (INIS)

    Semmler, R.A.

    1984-01-01

    An aerial survey of terrestrial gamma radiation was performed during the period 4 November through 15 November 1982 over a 16-kilometer by 16-kilometer (10-mile by 10-mile) area approximately centered on the Palo Verde Nuclear Generating Station near Wintersburg, Arizona. Gamma radiation spectral data were collected while flying a helicopter over a regular pattern of parallel lines spaced 150 meters (500 feet) apart at an altitude of 90 meters (300 feet). All radiation measurements taken at the nominal flight altitude were corrected for altitude variations, cosmic radiation, and helicopter background to generate exposure rates from terrestrial sources extrapolated to 1 meter above ground level. The data are presented as isoradiation contour maps. The average terrestrial radiation levels fall between 8 and 14 microrentgens per hour (μR/h). All gamma radiation detected within the survey area was associated with naturally occurring radionuclides. Direct ground-based measurements at 1 meter height were also taken at four scattered sites within the survey area. These values agree with the contour intervals determined from the aerial measurements and differ from the mean value of adjacent contours by no more than 10%. 6 references, 5 figures, 2 tables

  12. IEEE Std 383-1974: IEEE standard for type test of Class IE electric cables, field splices, and connections for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard provides direction for establishing type tests which may be used in qualifying Class 1E electric cables, field splices, and other connections for service in nuclear power generating stations. General guidelines for qualifications are given in IEEE Std 323-1974, Standard for Qualifying Class IE Electric Equipment for Nuclear Power Generating Stations. Categories of cables covered are those used for power control and instrumentation services. Though intended primarily to pertain to cable for field installation, this guide may also be used for the qualification of internal wiring of manufactured devices. This guide does not cover cables for service within the reactor vessel

  13. Alternative methodology for assessing part-through-wall cracks in carbon steel bends removed from Point Lepreau Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Duan Xinjian, E-mail: duanx@aecl.c [Senior Engineer, Reactor Engineering Department, Atomic Energy of Canada Ltd., Mississauga, ON (Canada); Kozluk, Michael J., E-mail: kozlukm@aecl.c [Independent Consultant, Oakville, ON (Canada); Gendron, Tracy [Manager-HTS Materials Integrity, Atomic Energy of Canada Ltd., Chalk River, ON (Canada); Slade, John [Senior Technical Advisor, Point Lepreau Generating Station, Lepreau, NB (Canada)

    2011-03-15

    In 2008 April Point Lepreau Generating Station entered an extended refurbishment outage that will involve the replacement of key reactor components (fuel channels and connecting feeder pipes). Prior to the refurbishment outage, New Brunswick Power Nuclear had been successfully managing intergranular, axial cracking of carbon steel feeder piping, that were also experiencing thinning, in the Point Lepreau Generating Station, primarily by an aggressive program of inspection, repair and testing of ex-service material. For the previous three maintenance outages, a probabilistic safety evaluation (PSE) had been used to demonstrate that annual inspection of the highest risk locations maintains the nuclear safety risk from cracking at an acceptably low level. The PSE makes use of the Failure Assessment Diagram (FAD) model to predict the failure of part-through-wall cracks. Burst-pressure testing of two ex-service feeder pipe sections with part-through-wall cracks showed that this FAD model significantly under predicts the failure pressure measured in the component tests. Use of this FAD model introduces undesirable conservatism into PSE assessments that are used to optimize feeder piping inspection and maintenance plans. This paper describes an alternative finite element approach, which could be used to provide more representative structural models for use in PSE assessments. This alternative approach employs the elasto-plastic large strain finite element formulation; uses representative material properties; considers the spatial microstructural distribution; accounts for the effect of work hardening rate; models all deformation processes, i.e., uniform deformation, localized necking, and failure imitation and propagation. Excellent pre-test prediction was shown for the burst-pressure test performed in 2006. Although cold-worked feeder bends have reduced fracture toughness compared to the parent straight pipe, post-test metallurgical examinations showed that failure at the

  14. Proposed Darlington generating station

    International Nuclear Information System (INIS)

    1975-05-01

    The proposed Darlington GS A project, consisting of four 850 MW CANDU-type reactors, is described. Construction and operation will cause environmental changes with regard to air, water, aquatic life, the site area, safety and noise, and the predicted changes are described. (E.C.B.)

  15. Heat-shrinkable splicing materials for Class 1E wire and cable systems in nuclear power generating stations

    International Nuclear Information System (INIS)

    Handa, Katsue; Maruyama, Masahiro; Kanno, Mikio; Ohya, Shingo; Nagakawa, Seiji; Sugimori, Mikihiro

    1987-01-01

    This report describes the shapes of heat-shrinkable splicing materials (cable sleeve and breakout, and round end cap) made of polyolefine resin, their application to cable splicing, and the properties of the materials as well as of the splice using them. Particularly, the report features introduction of their properties as determined by tests under the same conditions as used in Japan in qualifying tests on wires and cables for nuclear power generating stations. The heat-shrinkable splicing materials proved to be equal in properties to flame-retardant cables for nuclear power plants when tested for oxygen index and subjected to a vertical flame test on ''insulated wire'' and a vertical tray flame test on the cable splice. It was also confirmed that Class 1E cable using these splicing materials could stand the most rigorous environmental test in Japan. Therefore they can be used for splicing Class 1E wires and cables and the splice formed with them can be regarded as Class 1E specified in IEEE Std. 383. (author)

  16. Development of the APR1400 model for countercurrent natural circulation in hot leg and steam generator under station blackout

    International Nuclear Information System (INIS)

    Park, Sang Gil; Kim, Han Chul

    2012-01-01

    In order to analyze severe accident phenomena, Korea Institute of Nuclear Safety (KINS) made a MELCOR model for APR1400 to examine natural circulation and creep rupture failure in the Reactor Coolant System (RCS) under station blackout (SBO). In this study, we are trying to advance the former model to describe natural circulation more accurately. After Fukushima accident, the concerns of severe accident management, assuring the heat removal capability, has risen for the case when the SBO is happened and there are no more electric powers to cool down decay heat. Under SBO there are three kinds of natural circulation which can delay the core heatup. One is in vessel natural circulation in the upper plenum of reactor vessel and the second is countercurrent natural circulation in hot leg through steam generator tubes and the last is full loop natural circulation when the reactor coolant pump loop seal is cleared and reactor coolant pump sealing is damaged by high temperature and high pressure. Among them this study focuses on the countercurrent natural circulation model using MELCOR1.8.6

  17. Aerial radiological survey of the Waterford Generating Station and surrounding area, Taft, Louisiana. Date of survey: March-April 1982

    International Nuclear Information System (INIS)

    Jaffe, R.J.; Feimster, E.L.

    1984-02-01

    An aerial survey of the Waterford Generating Station near Taft, Louisiana was conducted during the period March 24 through April 7, 1982. The area encompassed a 256-square-kilometer (100-square-mile) area centered on the reactor facilities. Inferred exposure rates were due primarily to naturally occurring gamma-emitting radionuclides and cosmic ray activity (estimated at 3.7 μR/h). The exposure rates varied from 7 to 60 μR/h. Throughout most of the residential/industrial areas, the inferred exposure rate range was 7 to 12 μR/h. Marsh and water-covered areas were less than 7 μR/h. Two areas were encountered which had activity elevated above the typical background: (1) an industrial waste pond located 2 kilometers southeast of the site, and (2) a small area located 5 kilometers southeast of the site on the south bank of the Mississippi River. (A river barge was docked at this location during the survey.) Maximum inferred exposure rates over these areas were 60 and 16 μR/h, respectively. Spectral analysis revealed gamma-emitting radionuclides of the uranium decay chain as the primary contributors to this elevated activity. Ground-based measurements made in several areas were consistent with the aerial data. This was the first aerial radiological survey conducted over this area. 3 references, 9 figures, 3 tables

  18. Experience in ultrasonic gap measurement between calandria tubes and liquid injection shutdown systems nozzles in Bruce Nuclear Generating Station

    International Nuclear Information System (INIS)

    Abucay, R.C.; Mahil, K.S.; Goszczynski, J.J.

    1995-01-01

    The gaps between calandria tubes (CT) and Liquid Injection Shutdown System (LISS) nozzles at the Bruce Nuclear Generating Station ''A'' (Bruce A) are known to decrease with time due to radiation induced creep/sag of the calandria tubes. If this gap decreases to a point where the calandria tubes come into contact with the LISS nozzle, the calandria tubes could fail as a result of fretting damage. Proximity measurements were needed to verify the analytical models and ensure that CT/LISS nozzle contact does not occur earlier than predicted. The technique used was originally developed at Ontario Hydro Technologies (formerly Ontario Hydro Research Division) in the late seventies and put into practical use by Research and Productivity Council (RPC) of New Brunswick, who carried out similar measurements at Point Lepreau NGS in 1989 and 1991. The gap measurement was accomplished y inserting an inspection probe, containing four ultrasonic transducers (2 to measure gaps and 2 to check for probe tilt) and a Fredericks electrolytic potentiometer as a probe rotational sensor, inside LISS Nozzle number-sign 7. The ultrasonic measurements were fed to a system computer that was programmed to convert the readings into fully compensated gaps, taking into account moderator heavy water temperature and probe tilt. Since the measured gaps were found to be generally larger than predicted, the time to CT/LISS nozzle contact is now being re-evaluated and the planned LISS nozzle replacement will likely be deferred, resulting in considerable savings

  19. Evaluation of slow shutdown system flux detectors in Point Lepreau Generating Station - II: dynamic compensation error analysis

    Energy Technology Data Exchange (ETDEWEB)

    Anghel, V.N.P.; Sur, B. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Taylor, D. [New Brunswick Power Nuclear, Point Lepreau, New Brunswick (Canada)

    2009-07-01

    CANDU reactors are protected against reactor overpower by two independent shutdown systems: Shut Down System 1 and 2 (SDS1 and SDS2). At the Point Lepreau Generating Station (PLGS), the shutdown systems can be actuated by measurements of the neutron flux from Platinum-clad Inconel In-Core Flux Detectors. These detectors have a complex dynamic behaviour, characterized by 'prompt' and 'delayed' components with respect to immediate changes in the in-core neutron flux. It was shown previously (I: Dynamic Response Characterization by Anghel et al., this conference) that the dynamic responses of the detectors changed with irradiation, with the SDS2 detectors having 'prompt' signal components that decreased significantly. In this paper we assess the implication of these changes for detector dynamic compensation errors by comparing the compensated detector response with the power-to-fuel and the power-to-coolant responses to neutron flux ramps as assumed by previous error analyses. The dynamic compensation error is estimated at any given trip time for all possible accident flux ramps. Some implications for the shutdown system trip set points, obtained from preliminary results, are discussed. (author)

  20. Application of ecological risk assessment to establish nonhuman environmental protection at nuclear generating stations in Ontario, Canada

    International Nuclear Information System (INIS)

    Wismer, D.A.

    2004-01-01

    A screening ecological risk assessment was performed for regulatory compliance at three Ontario nuclear generating station sites to establish design requirements for a routine contaminant monitoring program and to address the need for non-contaminant stressor management. Site specific assessments went beyond traditional contaminant risk assessment to include stressors associated with land-use change, cooling water systems and site storm water runoff. Valued terrestrial and aquatic ecosystem components were selected from species lists after stakeholder consultation, and contaminants of concern were selected based on their relative loadings, and with respect to regulatory and literature-based benchmarks. Predictive modeling was used to estimate chemical and radionuclide exposures and likelihood of effects. Adverse effects on individual biota were predicted for aqueous emissions of chlorine and storm water but not for radionuclides. Retrospective analyses of past field monitoring were used to determine likelihood of effects from non-contaminant stressors. Individual-level adverse effects were observed for fish losses from cooling water withdrawal. Depending on the site and the biological species, either beneficial or adverse effects from thermal discharge and land-use change were observed. Followup studies include monitoring, laboratory study, computer modeling and mitigation. Field monitoring will generate more precise species-level estimates of intake fish losses, magnitude of fish response to thermal discharge and chlorine concentrations in near-field discharge waters. Laboratory study is determining the effectiveness of intake fish loss mitigation technology. Computer fish population models are being used to design field studies and interpret individual level effects. Mitigation includes storm water controls and habitat biodiversity management projects to offset past losses from site development and construction. Routine contaminant monitoring is planned to

  1. Socioeconomic impacts of nuclear generating stations: Arkansas Nuclear One station case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Arkansas Nuclear One nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  2. IEEE guide for planning of pre-operational testing programs for class 1E power systems for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The Institute of Electrical and Electronics Engineers (IEEE) guide for pre-operational testing of Class 1E power systems for nuclear-power generating stations is presented. The guidelines apply to power systems both ac and dc supplies but not to the equipment which utilizes the ac and dc power. The pre-operational tests are performed after appropriate construction tests

  3. Weather Radar Stations

    Data.gov (United States)

    Department of Homeland Security — These data represent Next-Generation Radar (NEXRAD) and Terminal Doppler Weather Radar (TDWR) weather radar stations within the US. The NEXRAD radar stations are...

  4. Estimating cancer risk in relation to tritium exposure from routine operation of a nuclear-generating station in Pickering, Ontario.

    Science.gov (United States)

    Wanigaratne, S; Holowaty, E; Jiang, H; Norwood, T A; Pietrusiak, M A; Brown, P

    2013-09-01

    Evidence suggests that current levels of tritium emissions from CANDU reactors in Canada are not related to adverse health effects. However, these studies lack tritium-specific dose data and have small numbers of cases. The purpose of our study was to determine whether tritium emitted from a nuclear-generating station during routine operation is associated with risk of cancer in Pickering, Ontario. A retrospective cohort was formed through linkage of Pickering and north Oshawa residents (1985) to incident cancer cases (1985-2005). We examined all sites combined, leukemia, lung, thyroid and childhood cancers (6-19 years) for males and females as well as female breast cancer. Tritium estimates were based on an atmospheric dispersion model, incorporating characteristics of annual tritium emissions and meteorology. Tritium concentration estimates were assigned to each cohort member based on exact location of residence. Person-years analysis was used to determine whether observed cancer cases were higher than expected. Cox proportional hazards regression was used to determine whether tritium was associated with radiation-sensitive cancers in Pickering. Person-years analysis showed female childhood cancer cases to be significantly higher than expected (standardized incidence ratio [SIR] = 1.99, 95% confidence interval [CI]: 1.08-3.38). The issue of multiple comparisons is the most likely explanation for this finding. Cox models revealed that female lung cancer was significantly higher in Pickering versus north Oshawa (HR = 2.34, 95% CI: 1.23-4.46) and that tritium was not associated with increased risk. The improved methodology used in this study adds to our understanding of cancer risks associated with low-dose tritium exposure. Tritium estimates were not associated with increased risk of radiationsensitive cancers in Pickering.

  5. IEEE Std 600: IEEE trial-use standard requirements for organizations that conduct qualification testing of safety systems equipment for use in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The purpose of this standard is to provide requirements for establishing a program for conducting qualification tests of safety systems equipment used in nuclear power generating stations. Compliance with the requirements of this standard does not assure the adequacy of the qualification tests performed. This standard applies to organizations that conduct qualification tests on equipment that has a definable safety function and is an identifiable part of a safety system for use in nuclear power generating stations. It requires a technical program, a quality assurance program, and a demonstrated ability to meet specified technical requirements. It does not apply to materials tests, production tests, normal performance testing, qualification by analysis, qualification by operating experience, or reliability tests such as diesel-generator multiple start tests. The intent of this standard is to achieve greater consistency, reliability, and reproducibility of test results and to provide adequate control of qualification testing of safety systems equipment

  6. SOFSEM 2017: theory and practice of computer science: 43rd International Conference on Current Trends in Theory and Practice of Computer Science, Limerick, Ireland, January 16-20, 2017, Proceedings

    NARCIS (Netherlands)

    Steffen, B.; Baier, C.; van den Brand, M.G.J.; Eder, J.; Hinchey, M.; Margaria, T.

    2017-01-01

    This book constitutes the refereed proceedings of the 43rd International Conference on Current Trends in Theory and Practice of Computer Science, SOFSEM 2017, held in Limerick, Ireland, in January 2017. The 34 papers presented in this volume were carefully reviewed and selected from 41 submissions.

  7. Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529 and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1975-09-01

    The proposed action is the issuance of construction permits to the Arizona public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be prominently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects. The total radiation dose to construction workers is estimated to be 15 man-rem. This dose is a small fraction of the approximately 470 man-rem which will be received by the construction force over the same period from natural background radiation. Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do result form the proposed action

  8. Secure base stations

    NARCIS (Netherlands)

    Bosch, Peter; Brusilovsky, Alec; McLellan, Rae; Mullender, Sape J.; Polakos, Paul

    2009-01-01

    With the introduction of the third generation (3G) Universal Mobile Telecommunications System (UMTS) base station router (BSR) and fourth generation (4G) base stations, such as the 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) Evolved Node B (eNB), it has become important to

  9. Final Environmental Statement related to the operation of Wolf Creek Generating Station, Unit No. 1. Docket No. STN 50-482, Kansas Gas and Electric Company, et al

    International Nuclear Information System (INIS)

    1982-06-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of Wolf Creek Generating Station Unit 1 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts will also be small. However, steam fog from the station's cooling lake has the potential for reducing visibility over nearby roads and bridges. A fog-monitoring program for roads and bridges near the lake has been recommended. Impacts to historic and prehistoric sites will be negligible. Chemical discharges to the Neosho River are expected to have no appreciable impacts on water quality under normal conditions and will be required to meet conditions of the station's NPDES permit. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission line facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for the Wolf Creek Generating Station Unit 1

  10. Post-Flight Microbial Analysis of Samples from the International Space Station Water Recovery System and Oxygen Generation System

    Science.gov (United States)

    Birmele, Michele N.

    2011-01-01

    The Regenerative, Environmental Control and Life Support System (ECLSS) on the International Space Station (ISS) includes the the Water Recovery System (WRS) and the Oxygen Generation System (OGS). The WRS consists of a Urine Processor Assembly (UPA) and Water Processor Assembly (WPA). This report describes microbial characterization of wastewater and surface samples collected from the WRS and OGS subsystems, returned to KSC, JSC, and MSFC on consecutive shuttle flights (STS-129 and STS-130) in 2009-10. STS-129 returned two filters that contained fluid samples from the WPA Waste Tank Orbital Recovery Unit (ORU), one from the waste tank and the other from the ISS humidity condensate. Direct count by microscopic enumeration revealed 8.38 x 104 cells per mL in the humidity condensate sample, but none of those cells were recoverable on solid agar media. In contrast, 3.32 x lOs cells per mL were measured from a surface swab of the WRS waste tank, including viable bacteria and fungi recovered after S12 days of incubation on solid agar media. Based on rDNA sequencing and phenotypic characterization, a fungus recovered from the filter was determined to be Lecythophora mutabilis. The bacterial isolate was identified by rDNA sequence data to be Methylobacterium radiotolerans. Additional UPA subsystem samples were returned on STS-130 for analysis. Both liquid and solid samples were collected from the Russian urine container (EDV), Distillation Assembly (DA) and Recycle Filter Tank Assembly (RFTA) for post-flight analysis. The bacterium Pseudomonas aeruginosa and fungus Chaetomium brasiliense were isolated from the EDV samples. No viable bacteria or fungi were recovered from RFTA brine samples (N= 6), but multiple samples (N = 11) from the DA and RFTA were found to contain fungal and bacterial cells. Many recovered cells have been identified to genus by rDNA sequencing and carbon source utilization profiling (BiOLOG Gen III). The presence of viable bacteria and fungi from WRS

  11. IEEE C37.105-1987: IEEE standard for qualifying Class 1E protective relays and auxiliaries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard describes the basic principles, requirements, and methods for qualifying Class 1E protective relays and auxiliaries such as test and control switches, terminal blocks, and indicating lamps for applications in nuclear power generating stations. When properly employed it can be used to demonstrate the design adequacy of such equipment under normal, abnormal, design basis event and post design basis event conditions in accordance with ANSI/IEEE Std 323-1983. When protective relays and auxiliaries are located in areas not subject to harsh environments, environmental qualification is not required. Protective relays and auxiliaries located inside primary containment in a nuclear power generating station present special conditions beyond the scope of this document. The qualification procedure presented is generic in nature. Other methods may be used at the discretion of the qualifier, provided the basic precepts of ANSI/IEEE Std 32301983 are satisfied

  12. Co-ordination of federal and provincial environmental assessment processes for the Point Lepreau Generating Station Solid Radioactive Waste Management Facility modifications

    Energy Technology Data Exchange (ETDEWEB)

    Hickman, C.; Thompson, P.D. [Point Lepreau Generating Station, Point Lepreau Refurbishment Project, Lepreau, New Brunswick (Canada); Barnes, J. [Jacques Whitford Environment Ltd., Fredericton, New Brunswick (Canada)

    2006-07-01

    Modification of the Solid Radioactive Waste Management Facility at Point Lepreau Generating Station is required to accommodate waste generated during and after an 18-month maintenance outage during which the station would be Refurbished. The modification of the facility triggered both federal and provincial environmental assessment requirements, and these assessments were conducted in a 'coordinated' and cooperative fashion. In this project, the coordinated approach worked well, and provided some significant advantages to the proponent, the public and the regulators. However, there are opportunities for further improvement in future projects, and this paper explores the advantages and disadvantages of this 'co-ordinated' approach. As part of this exploration, there is a discussion of administrative and regulatory changes that the province is considering for the environmental assessment process, and a discussion of the need for a formal 'harmonization' agreement. (author)

  13. Co-ordination of federal and provincial environmental assessment processes for the Point Lepreau Generating Station Solid Radioactive Waste Management Facility modifications

    International Nuclear Information System (INIS)

    Hickman, C.; Thompson, P.D.; Barnes, J.

    2006-01-01

    Modification of the Solid Radioactive Waste Management Facility at Point Lepreau Generating Station is required to accommodate waste generated during and after an 18-month maintenance outage during which the station would be Refurbished. The modification of the facility triggered both federal and provincial environmental assessment requirements, and these assessments were conducted in a 'coordinated' and cooperative fashion. In this project, the coordinated approach worked well, and provided some significant advantages to the proponent, the public and the regulators. However, there are opportunities for further improvement in future projects, and this paper explores the advantages and disadvantages of this 'co-ordinated' approach. As part of this exploration, there is a discussion of administrative and regulatory changes that the province is considering for the environmental assessment process, and a discussion of the need for a formal 'harmonization' agreement. (author)

  14. IEEE No. 323, IEEE trial-use standard: General guide for qualifying Class I electric equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes the basic requirements for the qualification of Class I electric equipment. This is equipment which is essential to the safe shutdown and isolation of the reactor or whose failure or damage could result in significant release of radioactive material. The purpose of this document is to provide guidance for demonstrating the qualifications of electrical equipment as required in the IEEE Std 279 -- Criteria for Nuclear Power Generating Station Protection Systems, and IEEE Std 308 -- Criteria for Class 1E Electric Systems for Nuclear Power Generating Stations. The qualification methods described may be used in conjunction with the Guides for qualifying specific types of equipment, (see Foreword), for updating qualification following modifications or for qualifying equipment for which no applicable Guide exists

  15. IEEE Std 535-1979: IEEE standard for qualification of Class 1E lead storage batteries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes qualification methods for Class 1E lead storage batteries and racks to be used in nuclear power generating stations outside of primary containment. Qualification required in ANSI/IEEE Std 279-1971 and IEE Std 308-1978, can be demonstrated by using the procedures provided in this standard in accordance with IEEE Std 323-1974. Battery sizing, maintenance, capacity testing, installation, charging equipment and consideration of other type batteries are beyond the scope of this standard

  16. IEEE Std 535-1986: IEEE standard for qualification of Class 1E lead storage batteries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes qualification methods for Class 1E lead storage batteries and racks to be used in nuclear power generating stations outside of primary containment. Qualification required in ANSI/IEEE Std 308-1980 can be demonstrated by using the procedures provided in this standard in accordance with ANSI/IEEE Std 323-1983. Battery sizing, maintenance, capacity testing, installation, charging equipment, and consideration of other type batteries are beyond the scope of this standard

  17. Potential for use of condenser cooling waters from fossil fuel and nuclear power generating stations for freshwater aquaculture in cold climates

    International Nuclear Information System (INIS)

    Armstrong, G.C.

    1976-01-01

    Some limiting factors to the future development of freshwater aquaculture are considered. The most important of these are the need for new and improved technology for the production of better quality products at lower cost and for the promotion and establishment of new markets. The use of relatively small amounts of heated effluent water from power generating stations to optimize water temperatures is one feasible method for increasing growth and lowering the cost of production. (author)

  18. About Economy of Fuel at Thermal Power Stations due to Optimization of Utilization Diagram of Power-Generating Equipment

    Directory of Open Access Journals (Sweden)

    M. V. Svechko

    2008-01-01

    Full Text Available Problems of rational fuel utilization becomes more and more significant especially for thermal power stations (TPS. Thermal power stations have complicated starting-up diagrams and utilization modes of their technological equipment. Method of diagram optimization of TPS equipment utilization modes has been developed. The method is based on computer analytical model with application of spline-approximation of power equipment characteristics. The method allows to economize fuel consumption at a rate of 15-20 % with accuracy of the predicted calculation not more than 0.25 %.

  19. Overhaul of the generator of the hydroelectric central station Ingeniero Carlos Ramirez Ulloa; Rehabilitacion del generador de la unidad 2 de la central hidroelectrica ingeniero Carlos Ramirez Ulloa

    Energy Technology Data Exchange (ETDEWEB)

    Robles Pimentel, Edgar [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Garcia Hernandez, Javier [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1997-12-31

    In November 1995, the failure of the Unit 2 generator at the hydroelectric central station Ingeniero Carlos Ramirez Ulloa, El Caracol, occurred. The accident forced to carry out its overhaul. Here are presented the technical problems faced during the overhaul of the generator and analyzed the implemented solutions. [Espanol] En noviembre de 1995 ocurrio la falla del generador de la unidad 2 de la central hidroelectrica Ing. Carlos Ramirez Ulloa, El Caracol. El accidente obligo a llevar a cabo su rehabilitacion. Se presentan los problemas tecnicos enfrentados durante la rehabilitacion del generador y se discuten las soluciones implementadas.

  20. Overhaul of the generator of the hydroelectric central station Ingeniero Carlos Ramirez Ulloa; Rehabilitacion del generador de la unidad 2 de la central hidroelectrica ingeniero Carlos Ramirez Ulloa

    Energy Technology Data Exchange (ETDEWEB)

    Robles Pimentel, Edgar [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Garcia Hernandez, Javier [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1998-12-31

    In November 1995, the failure of the Unit 2 generator at the hydroelectric central station Ingeniero Carlos Ramirez Ulloa, El Caracol, occurred. The accident forced to carry out its overhaul. Here are presented the technical problems faced during the overhaul of the generator and analyzed the implemented solutions. [Espanol] En noviembre de 1995 ocurrio la falla del generador de la unidad 2 de la central hidroelectrica Ing. Carlos Ramirez Ulloa, El Caracol. El accidente obligo a llevar a cabo su rehabilitacion. Se presentan los problemas tecnicos enfrentados durante la rehabilitacion del generador y se discuten las soluciones implementadas.

  1. Technical specifications: Hope Creek Generating Station (Docket No. 50-354). Appendix A to License No. NPF-50

    International Nuclear Information System (INIS)

    1986-04-01

    Information is provided on the technical specifications for the Hope Creek Nuclear Power Station. Areas of interest discussed in this report include: safety limits and limiting safety system settings; limiting conditions for operation and surveillance requirements; design features; and administrative controls

  2. Analysis methodology of power generation/cogeneration designs in VNG (Vehicular Natural Gas) stations; Metodologia de analise de projetos de geracao/cogeracao em postos GNV (Gas Natural Veicular)

    Energy Technology Data Exchange (ETDEWEB)

    Romanos, Rafael Reami [Companhia de Gas de Santa Catarina (SCGAS), Florianopolis, SC (Brazil)

    2008-07-01

    This work presents the methodology for analysis of generation/cogeneration projects in NGV filling stations, determining the influence of critical parameters in its technical-economic viability. To achieve this methodology, it was necessary to define parameters that influence directly or indirectly the size of a generating system, as the total electric demand of the filling station, ratio (power of the compressor) / (total installed power), load factor, factor of simultaneity, technical data of major equipment, among others. The methodology has been validated by comparing with data measured in a NGV filling station and allows screening and identifying customers with technical feasibility to evolve in a generation or cogeneration project. The cogeneration with NG generators was highlighted during the analysis of the NGV filling stations and was feasible for establishments which have large thermal demand, as filling stations along the road with large amounts of electric showers in changing rooms. (author)

  3. On the legal nature of electricity supply contracts concluded by electricity companies and power stations generating electricity from renewable energy sources

    International Nuclear Information System (INIS)

    Herrmann, B.J.

    1998-01-01

    Section 2 of the German Act for enhanced use of electricity from renewable energy sources (StEG) defines the obligation to contract but not the contractual obligations, i.e. the conditions of performance of the contract (supply and purchase of electricity and the legal obligations of contractors). The analysis here shows that characterising this mandatory contract required by the act as an agreement of purchase and sale more appropriately describes the legal nature of the contract and the intent of the legislator than other contracts for supply and purchase of electricity, as for instance those concluded by electric utilities and their customers. One specific aspect elaborated by the author is that the StEG does not constitute an obligation to supply on the part of the renewable energy generating power station, so that the power station operator is not obliged to ensure availability of the electricity at any time or in terms of supplies that can be called off by the purchasing utility, whereas the electric utility is obliged by section 2 of the StEG to purchase the contractual amounts from the generating station. (orig./CB) [de

  4. A charge regulating system for turbo-generator gas-cooled high-temperature reactor power stations

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegtnes, K.O.

    1975-01-01

    The invention relates to a regulating system for gas-cooled high-temperature reactors power stations (helium coolant), equipped with several steam-boilers, each of which deriving heat from a corresponding cooling-gas flow circulating in the reactor, so as to feed superheated steam into a main common steam-manifold and re-superheated steam into a re-superheated hot common manifold [fr

  5. Power stations

    International Nuclear Information System (INIS)

    Cawte, H.; Philpott, E.F.

    1980-01-01

    The object is to provide a method of operating a dual purpose power station so that the steam supply system is operated at a high load factor. The available steam not required for electricity generation is used to provide process heat and the new feature is that the process plant capacity is determined to make the most economic use of the steam supply system, and not to match the passout capacity of the turbine of the turbogenerator. The product of the process plant should, therefore, be capable of being stored. A dual-purpose power station with a nuclear-powered steam source, turbogenerating means connected to the steam source and steam-powered process plant susceptible to wide variation in its rate of operation is described. (U.K.)

  6. Palo Verde Nuclear Generating Station Units 1, 2, and 3: Draft environmental statement (Docket Nos. STN 50-528, 529, and 530)

    International Nuclear Information System (INIS)

    1975-04-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Corporation for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2 and 3. Preparation of the 3880-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be permanently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use (Sec. 4. 1). Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects (Sec. 4.3 and 4.5). Approximately 60 acres of agricultural land will be temporarily affected by construction in transmission corridors. The great majority can be returned to that use upon completion of construction, thus the impact is considered minor. Similarly, most grazing lands affected along these corridors, as well as along the water pipeline corridor, can eventually be returned to that use. New archaeological resources could be discovered along the path of final transmission corridor alignments. The applicant will take measures to locate and protect such resources if they exist. 75 refs., 24 figs., 65 tabs

  7. Relationship between IEEE Std. 7-4.3.2-1993 and ASME NQA-1, parts I and II revisions and the impact on nuclear power generating stations

    International Nuclear Information System (INIS)

    Blauw, R.J.

    1996-01-01

    Clear understanding of software related design control requirements is key to growth in the use of computers in nuclear power generating stations. Inconsistent terminology within the nuclear and software standards arena has impacted the ability of both nuclear station system engineers (i.e., the domain expert) to clearly communicate with the software/computer hardware experts. In order for computer development to occur both groups need to have a common terminology basis. Without this commonality, inappropriate application of requirements could result. This paper will present a overview of ongoing efforts within the Institute of Electrical and Electronics Engineers Nuclear Power Engineering Committee (IEEE NPEC) and the American Society of Mechanical Engineers Nuclear Quality Assurance (ASME NQA) Committee to develop this commonality

  8. External gamma radiation monitoring in the environs of Kaiga Generating Station (KGS), using thermoluminescent dosimeters, during the period 1989-2003

    International Nuclear Information System (INIS)

    Basu, A.S.; Chougaonkar, M.P.; Mayya, Y.S.; Puranik, V.D.; Reji, T.K.; Ravi, P.M.; Hegde, A.G.

    2005-05-01

    This publication reports the results of external gamma radiation monitoring using Thermoluminescent Dosimeters (TLDs), in the environs of Kaiga Generating Station (KGS) during its preoperational survey between October 1989 and June 1998. The report also presents quarterly and annual values of air dose during the operational phase of the station between July 1998 and Dec. 2003 around the environmcnt of KGS. The results of TLD analysis, during the period October 1989-June 1998, indicate that the average annual air dose for the locations monitored, was 502± 91 μGy/a. The general background of the environs around Kaiga during the operational period, i.e. July 1998 and Dec. 2003, between 2.3 km. to 32km. has been found to be 509±74 μGy/a. The report discusses the methodology and different analyses carried out. (author)

  9. Volume reduction/solidification of liquid radioactive waste using bitumen at Ontario hydro's Bruce nuclear generating station open-quotes Aclose quotes

    International Nuclear Information System (INIS)

    Day, J.E.; Baker, R.L.

    1994-01-01

    Ontario Hydro at the Bruce Nuclear Generating Station open-quotes Aclose quotes has undertaken a program to render the station's liquid radioactive waste suitable for discharge to Lake Huron by removing sufficient radiological and chemical contaminants from five different plant waste streams. The contaminants will be immobilized and stored at on-site radioactive waste storage facilities and the purified streams will be discharged. The discharge targets established by Ontario Hydro are set well below the limits established by the Ontario Ministry of Environment (MOE) and are based on the Best Available Technology Economically Achievable Approach (B.A.T.E.A.). ADTECHS Corporation has been selected by Ontario Hydro to provide volume reduction/solidification technology for one of the five waste streams. The system will dry and immobilize the contaminants from a liquid waste stream in emulsified asphalt using thin film evaporation technology

  10. Characterization of alternative electric generation technologies for the SPS comparative assessment: volume 2, central-station technologies

    International Nuclear Information System (INIS)

    1980-08-01

    The SPS Concept Development and Evaluation Program includes a comparative assessment. An early first step in the assessment process is the selection and characterization of alternative technologies. This document describes the cost and performance (i.e., technical and environmental) characteristics of six central station energy alternatives: (1) conventional coal-fired powerplant; (2) conventional light water reactor (LWR); (3) combined cycle powerplant with low-Btu gasifiers; (4) liquid metal fast breeder reactor (LMFBR); (5) photovoltaic system without storage; and (6) fusion reactor

  11. Generating a representative signal of coal ash content to anticipate combustion control in a thermal power station

    International Nuclear Information System (INIS)

    Prieto-Fernandez, Ismael; Santurio-Diaz, J.M.; Folgueras-Diaz, B.; Lopez-Bobo, M. Rosario; Fernandez-Viar, P.

    2004-01-01

    This paper describes the possibilities of continuously measuring coal ash in the boiler feeding circuit of a thermal power station so that the measurement can be used as a signal for the boiler combustion control system. An installation was designed, at semi-industrial scale, that could faithfully reproduce the operation of a belt feeder. In order to measure the ash content, a natural radioactivity meter was installed and a large number of coal samples with different ranks and grain sizes were tested, eventually showing the possibility of achieving the objective

  12. Socioeconomic impacts of nuclear generating stations: Peach Bottom case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Peach Bottom nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  13. Socioeconomic impacts of nuclear generating stations: St. lucie case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Weisiger, M.L.; Pijawka, K.D.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the St. Lucie nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study are during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  14. Socioeconomic impacts of nuclear generating stations: Oconee case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Oconee nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  15. Socioeconomic impacts of nuclear generating stations: Rancho Seco case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Bergmann, P.A.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Rancho Seco nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  16. Socioeconomic impacts of nuclear generating stations: Three Mile Island case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Flynn, C.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Three Mile Island nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  17. Socioeconomic impacts of nuclear generating stations - Diablo Canyon case study. Technical report for 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Pijawka, K.D.; Yaquinto, G.

    1982-07-01

    This report documents a case study of the socioeconomic impacts of the construction and operation of the Diablo Canyon nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlemeent patterns and housing, local government and public services, social structure, and public response in the study during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  18. Aseismatic design and safety of nuclear power generation facilities. On aseismatic capability of commercial nuclear power stations

    International Nuclear Information System (INIS)

    Kato, Muneaki

    1995-01-01

    In view of the great Hanshin earthquake, the aseismatic safety of the important facilities in nuclear power stations is ensured by the location direct on base rocks, the design with the earthquake force at least three times as large as that in the building standard, and the consideration of the earthquakes due to active faults as design earthquake. The basic policy of the aseismatic design of nuclear power stations is described. The determination of the earthquake motions due to strongest earthquake and utmost limit earthquake for design, the survey of the geological features and ground of the sites and so on are explained. In the aseismatic design of buildings and structures, structural planning, the modeling for the aseismatic analysis of buildings, the analysis of time historical response and so on are carried out. In the aseismatic design of equipment and piping systems, the planning of aseismatic support structures, the aseismatic design and the analysis of time historical response, the spectral modal analysis for other systems such as multiple material point system and so on are described. The tests and researches related to the aseismatic design are reported. (K.I.)

  19. Socioeconomic impacts of nuclear generating stations: D. C. Cook case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Branch, K.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the D. C. Cook nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  20. Socioeconomic impacts of nuclear generating stations: Surry case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Surry nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  1. Meteosat Second Generation station: processing software and computing arquitecture; Estacion de Recepcion de Imagenes del Satelite Meteosat Segunda generacion: Arquitectura Informatica y Software de Proceso

    Energy Technology Data Exchange (ETDEWEB)

    Martin, L; Cony, M; Navarro, A A; Zarzalejo, L F; Polo, J

    2010-05-01

    The Renewable Energy Division of CIEMAT houses a specific station for receiving the Meteosat Second Generation images, which is of interest in the works being carried out concerning the solar radiation derived from satellite images. The complexity, the huge amount of information being received and the particular characteristics of the MSG images encouraged the design and development of a specific computer structure and the associated software as well, for a better and more suitable use of the images. This document describes the mentioned structure and software. (Author) 8 refs.

  2. Procedure for qualify class 1E equipment for nuclear power generating stations; Kvalifikacija elektroopreme za stjecanje klase 1E u nuklearnim elektranama

    Energy Technology Data Exchange (ETDEWEB)

    Smiljanic, D [' Rade Koncar' Institut, Zagreb (Yugoslavia)

    1983-07-01

    This paper describes the basic requirements for qualifying Class 1E equipment and systems that are to be used in nuclear power generating stations. The requirements presented include the principles, procedures and methods of qualification. The qualification requirements will confirm the adequacy of the equipment design under normal, abnormal, design basis event, post design basis event and containment test conditions for the performance of Class 1 E functions. The presented methods of qualification are in accordance with IEEE Standards and other standards (IEC, JUS, DIN, etc,), and have the primary role to provide guidance for demonstrating the qualification of Class 1E equipment produced by 'Rade Koncar'.(author)

  3. IEEE Std 1205-1993: IEEE guide for assessing, monitoring, and mitigating aging effects on Class 1E equipment used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The guidelines are provided for assessing, monitoring, and mitigating degradation of Class 1E equipment used in nuclear power generating stations due to aging. The methods described can be used to identify the performance capability of Class 1E equipment beyond its qualified life. A discussion of stressors and aging mechanisms is included. If aging considerations have been satisfactorily addressed through other means (e.g., equipment qualification), then use of this guide may not be warranted. For some equipment, only partial application of this guide may be warranted

  4. Demonstration of containment purge and vent valve operability for the Hope Creek Generating Station, Unit 1 (Docket No. 50-354)

    International Nuclear Information System (INIS)

    Kido, C.

    1985-05-01

    The containment purge and vent valve qualification program for the Hope Creek Generating Station has been reviewed by the NRC Licensing Support Section. The review indicates that the licensee has demonstrated the dependability of containment isolation against the buildup of containment pressure due to a LOCA/DBA with the restrictions that during operating conditions 1, 2, and 3 all purge and vent valves will be sealed closed and under administrative control, and during power ascension and descension conditions the 26 in. inboard valve (1-GS-HV-4952) will be used in series with the 2 in. bypass valve (1-GS-HV-4951) to control the release of containment pressure

  5. Safety Evaluation Report related to the operation of Wolf Creek Generating Station, Unit No. 1 (Docket No. STN 50-482). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-06-01

    This report supplements the Safety Evaluation Report (SER) for the application filed by the Kansas Gas and Electric Company, as applicant and agent for the owners, for a license to operate the Wolf Creek Generating Station, Unit 1 (Docket No. STN 50-482). The facility is located in Coffey County, Kansas. This supplement provides recent information regarding resolution of the license conditions identified in the SER. Because of the favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the licensee at power levels greater than 5% without endangering the health and safety of the public

  6. NRC Fact-Finding Task Force report on the ATWS event at Salem Nuclear Generating Station, Unit 1, on February 25, 1983

    International Nuclear Information System (INIS)

    1983-03-01

    An NRC Region I Task Force was established on March 1, 1983 to conduct fact finding and data collection with regard to the circumstances which led to an anticipated transient without scram (ATWS) event at the Public Service Electric and Gas Company's Salem Generating Station, Unit 1 on February 25, 1983. The charter of the Task Force was to determine the factual information pertinent to management and administrative controls which should have ensured proper operation of the reactor trip breakers in the solid state protection system. This report documents the findings of the Task Force along with its conclusions

  7. Property Analysis of the Real-Time Uncalibrated Phase Delay Product Generated by Regional Reference Stations and Its Influence on Precise Point Positioning Ambiguity Resolution

    Directory of Open Access Journals (Sweden)

    Yong Zhang

    2017-05-01

    Full Text Available The real-time estimation of the wide-lane and narrow-lane Uncalibrated Phase Delay (UPD of satellites is realized by real-time data received from regional reference station networks; The properties of the real-time UPD product and its influence on real-time precise point positioning ambiguity resolution (RTPPP-AR are experimentally analyzed according to real-time data obtained from the regional Continuously Operating Reference Stations (CORS network located in Tianjin, Shanghai, Hong Kong, etc. The results show that the real-time wide-lane and narrow-lane UPD products differ significantly from each other in time-domain characteristics; the wide-lane UPDs have daily stability, with a change rate of less than 0.1 cycle/day, while the narrow-lane UPDs have short-term stability, with significant change in one day. The UPD products generated by different regional networks have obvious spatial characteristics, thus significantly influencing RTPPP-AR: the adoption of real-time UPD products employing the sparse stations in the regional network for estimation is favorable for improving the regional RTPPP-AR up to 99%; the real-time UPD products of different regional networks slightly influence PPP-AR positioning accuracy. After ambiguities are successfully fixed, the real-time dynamic RTPPP-AR positioning accuracy is better than 3 cm in the plane and 8 cm in the upward direction.

  8. Sociological impacts of nuclear generating stations - summary report on the NRC post-licensing studies. Final report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Chalmers, J.; Pijawka, D.; Branch, K.; Bergmann, P.; Flynn, J.

    1982-07-01

    The Post-Licensing Studies had four objectives. The first was to identify the socioeconomic effects resulting from the construction and operation of each of twelve nuclear power stations. The socioeconomic variables examined included: economic, demographic, housing, government, public response, and social organization characteristics. The second objective was to determine the way in which the identified effects were evaluated by study area groups. The third objective was to identify the determinants of the project-related effects. This task required knowledge of what combination of site, project, or other determinants was responsible for the project-related effects and for the evaluation of the effects. The fourth objective was to make recommendations with respect to assessment methodologies that could best be used to project the socioeconomic effects of the construction and operation of proposed nuclear generating stations. The objectives of the Post-Licensing Studies are met by the twelve individual case studies and by the Summary Report. The case studies identified the nuclear power stations and describe the evaluation of the effects by area residents. The Summary Report describes the collective findings of the individual case studies, compares the findings across sites to identify possible determinants of the effects, and examines the implication of the findings for future siting decisions and for the methodology most appropriate for projective assessments

  9. Evaluation of the Performance of ClimGen and LARS-WG models in generating rainfall and temperature time series in rainfed research station of Sisab, Northern Khorasan

    Directory of Open Access Journals (Sweden)

    najmeh khalili

    2016-10-01

    Full Text Available Introduction:Many existing results on water and agriculture researches require long-term statistical climate data, while practically; the available collected data in synoptic stations are quite short. Therefore, the required daily climate data should be generated based on the limited available data. For this purpose, weather generators can be used to enlarge the data length. Among the common weather generators, two models are more common: LARS-WG and ClimGen. Different studies have shown that these two models have different results in different regions and climates. Therefore, the output results of these two methods should be validated based on the climate and weather conditions of the study region. Materials and Methods:The Sisab station is 35 KM away from Bojnord city in Northern Khorasan. This station was established in 1366 and afterwards, the meteorological data including precipitation data are regularly collected. Geographical coordination of this station is 37º 25׳ N and 57º 38׳ E, and the elevation is 1359 meter. The climate in this region is dry and cold under Emberge and semi-dry under Demarton Methods. In this research, LARG-WG model, version 5.5, and ClimGen model, version 4.4, were used to generate 500 data sample for precipitation and temperature time series. The performance of these two models, were evaluated using RMSE, MAE, and CD over the 30 years collected data and their corresponding generated data. Also, to compare the statistical similarity of the generated data with the collected data, t-student, F, and X2 tests were used. With these tests, the similarity of 16 statistical characteristics of the generated data and the collected data has been investigated in the level of confidence 95%. Results and Discussion:This study showed that LARS-WG model can better generate precipitation data in terms of statistical error criteria. RMSE and MAE for the generated data by LAR-WG were less than ClimGen model while the CD value of

  10. Electric Power Plants and Generation Stations, Power Plants - is a seperate layer, however, we have them included in local building layer as well, Published in 2010, 1:2400 (1in=200ft) scale, Effingham County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Electric Power Plants and Generation Stations dataset current as of 2010. Power Plants - is a seperate layer, however, we have them included in local building layer...

  11. HECO annually conducts and reports results of a biological monitoring program for waters receiving effluent from the Kahe Generating Station, O'ahu, Hawai'i from 1977 to 1996 (NODC Accession 9900012)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The volume of sand and silt entrained and circulated by operation of the Kahe Generating Station is an environmental parameter of considerable geological and...

  12. Design and prototyping of an ionic liquid piston compressor as a new generation of compressors for hydrogen refueling stations

    DEFF Research Database (Denmark)

    Arjomand Kermani, Nasrin

    to investigate the heat transfer phenomena inside the compression chamber; the system performance is evaluated, followed by the design process. The model is developed based on the mass and energy balance of the hydrogen, and liquid bounded by the wall of the compression chamber. Therefore, at each time step...... and positional node, the model estimates the pressure and temperature of the hydrogen and liquid, the temperature of the compression chamber wall, and the amount of heat extracted from the hydrogen directly at the interface between the hydrogen and liquid, and through the wall. The results indicate......, fabrication, and control of the prototype is described in the presented work. The new compressor design has high potential to be used as an alternative to the conventional reciprocating compressors in hydrogen refueling stations, as it provides a simpler design with lower manufacturing costs, higher...

  13. Low-level radioactive waste from nuclear power generating stations: Characterization, classification and assessment of activated metals and waste streams

    International Nuclear Information System (INIS)

    Thomas, V.W.; Robertson, D.E.; Thomas, C.W.

    1993-02-01

    Since the enactment of 10 CFR Part 61, additional difficult-to-measure long-lived radionuclides, not specified in Tables 1 2 of Part 61, have been identified (e.g., 108m Ag, 93 Mo, 36 Cl, 10 Be, 113m Cd, 121m Sn, 126 Sn, 93m Nb) that may be of concern in certain types of waste. These nuclides are primarily associated with activated metal and perhaps other nuclear power low-level waste (LLW) being sent to disposal facilities. The concentration of a radionuclide in waste materials is normally determined by direct measurement or by indirect calculational methods, such as using a scaling factor to relate inferred concentration of a difficult-to-measure radionuclide to another that is easily measured. The total disposal site inventory of certain difficult-to-measure radionuclides (e.g., 14 C, 129 I, and 99 Tc) often control the total quantities of radioactive waste permitted in LLW burial facilities. Overly conservative scaling factors based on lower limits of detection (LLD), often used in the nuclear power industry to estimate these controlling nuclides, could lead to premature closure of a disposal facility. Samples of LLW (Class B and C activated metals [AM] and other waste streams) are being collected from operating nuclear power stations and analyzed for radionuclides covered in 10 CFR Part 61 and the additional difficult-to-measure radionuclides. This analysis will enhance the NRC's understanding of the distribution and projected quantities of radionuclides within AM and LLW streams from commercial nuclear power stations. This research will also provide radiological characterization of AM specimens for others to use in leach-rate and lysimeter experiments to determine nuclide releases and subsequent movement in natural soil environments

  14. Short-term hydro generation scheduling of Xiluodu and Xiangjiaba cascade hydropower stations using improved binary-real coded bee colony optimization algorithm

    International Nuclear Information System (INIS)

    Lu, Peng; Zhou, Jianzhong; Wang, Chao; Qiao, Qi; Mo, Li

    2015-01-01

    Highlights: • STHGS problem is decomposed into two parallel sub-problems of UC and ELD. • Binary coded BCO is used to solve UC sub-problem with 0–1 discrete variables. • Real coded BCO is used to solve ELD sub-problem with continuous variables. • Some heuristic repairing strategies are designed to handle various constraints. • The STHGS of Xiluodu and Xiangjiaba cascade stations is solved by IB-RBCO. - Abstract: Short-term hydro generation scheduling (STHGS) of cascade hydropower stations is a typical nonlinear mixed integer optimization problem to minimize the total water consumption while simultaneously meeting the grid requirements and other hydraulic and electrical constraints. In this paper, STHGS problem is decomposed into two parallel sub-problems of unit commitment (UC) and economic load dispatch (ELD), and the methodology of improved binary-real coded bee colony optimization (IB-RBCO) algorithm is proposed to solve them. Firstly, the improved binary coded BCO is used to solve the UC sub-problem with 0–1 discrete variables, and the heuristic repairing strategy for unit state constrains is applied to generate the feasible unit commitment schedule. Then, the improved real coded BCO is used to solve the ELD sub-problem with continuous variables, and an effective method is introduced to handle various unit operation constraints. Especially, the new updating strategy of DE/best/2/bin method with dynamic parameter control mechanism is applied to real coded BCO to improve the search ability of IB-RBCO. Finally, to verify the feasibility and effectiveness of the proposed IB-RBCO method, it is applied to solve the STHGS problem of Xiluodu and Xiangjiaba cascaded hydropower stations, and the simulating results are compared with other intelligence algorithms. The simulation results demonstrate that the proposed IB-RBCO method can get higher-quality solutions with less water consumption and shorter calculating time when facing the complex STHGS problem

  15. Optimal Site Selection of Wind-Solar Complementary Power Generation Project for a Large-Scale Plug-In Charging Station

    Directory of Open Access Journals (Sweden)

    Wenjun Chen

    2017-10-01

    Full Text Available The wind-solar hybrid power generation project combined with electric vehicle charging stations can effectively reduce the impact on the power system caused by the random charging of electric cars, contribute to the in-situ wind-solar complementary system and reduce the harm arising from its output volatility. In this paper, the site selection index system of a landscape complementary power generation project is established by using the statistical methods and statistical analysis in the literature. Subsequently, using the Analytic Network Process to calculate the index weight, a cloud model was used in combination with preference ranking organization method for enrichment evaluations to transform and sort uncertain language information. Finally, using the results of the decision-making for the location of the Shanghai wind-solar complementary project and by carrying out contrast analysis and sensitivity analysis, the superiority and stability of the decision model constructed in this study was demonstrated.

  16. The Concept of Limitation of the Vibration Generated by Rail-Vehicles at Railway Stations and Railway Crossings

    Science.gov (United States)

    Adamczyk, Jan; Targosz, Jan

    2011-03-01

    One of the possibilities of limitation of effects of dynamic influence of the rail-vehicles is the application of the complex objects of vibroinsulation when the mass of the vibroinsulating element is significant, and that is the case of the transporting machines and devices, when the geometric dimensions of the elements of vibroinsulation system are similar to the slab, where the process of modelling of the vibroinsulation mechanism as a discrete system, creates extreme hazards. The article presents the concept of limitation of effects of dynamic influence of the rail-vehicles and tram-vehicles, mainly in the railway tracks located at the railway stations, tram-stops and other engineering structures. The digital model was developed for simulation regarding the propagation of the vibration to the environment. The results of simulation were the basis for development of the vibroinsulation system for the rail-tracks located at the engineering structures such as railway stations, viaducts. The second part of the article presents the approach for controlling of the tension as a function of load of the railway crossing, which was modelled as discrete-continous model. The continuous systems consist of two elements, that is of the support made of elastomer and of the tension members with controlled tension depending on the crossing load. Together with development and more popular application of tension member systems in engineering structures, among others in vibroinsulation systems, it is important to include into calculations and experiments the dynamic loads of the tension member with the mass attached to it. In case of complex objects of vibroinsulation when the mass of the vibroinsulator is significant, and that is the case of the transporting machines and devices, when the geometric dimensions of the elements of vibroinsulation system are similar to the slab, where the process of modelling of the vibroinsulation mechanism as a discrete system, creates extreme

  17. Development of elements of the condition monitoring system of turbo generators of thermal power stations and nuclear power plants

    Science.gov (United States)

    Kumenko, A. I.; Kostyukov, V. N.; Kuz'minykh, N. Yu.; Boichenko, S. N.; Timin, A. V.

    2017-08-01

    The rationale is given for the improvement of the regulatory framework for the use of shaft sensors for the in-service condition monitoring of turbo generators and the development of control systems of shaft surfacing and misalignments of supports. A modern concept and a set of methods are proposed for the condition monitoring of the "shaft line-thrust bearing oil film-turbo generator supports" system elements based on the domestic COMPACS® technology. The system raw data are design, technology, installation, and operating parameters of the turbo generator as well as measured parameters of the absolute vibration of supports and mechanical quantities, relative displacements and relative vibration of the rotor teeth in accordance with GOST R 55263-2012. The precalculated shaft line assembly line in the cold state, the nominal parameters of rotor teeth positions on the dynamic equilibrium curve, the static and dynamic characteristics of the oil film of thrust bearings, and the shaft line stiffness matrix of unit support displacements have been introduced into the system. Using the COMPACS-T system, it is planned to measure positions and oscillations of rotor teeth, to count corresponding static and dynamic characteristics of the oil film, and the static and dynamic loads in the supports in real time. Using the obtained data, the system must determine the misalignments of supports and corrective alignments of rotors of coupling halves, voltages in rotor teeth, welds, and bolts of the coupling halves, and provide automatic conclusion if condition monitoring parameters correspond to standard values. A part of the methodological support for the proposed system is presented, including methods for determining static reactions of supports under load, the method for determining shaft line stiffness matrices, and the method for solving the inverse problem, i.e., the determination of the misalignments of the supports by measurements of rotor teeth relative positions in bearing

  18. The Grand Quevilly thermal test station - the SMW sodium circuit with a generator of superheated steam at 545 deg

    International Nuclear Information System (INIS)

    Robin, M.G.

    1964-01-01

    A 5 MW installation is described which is a reduced model of the heat exchange system of a sodium-cooled reactor. This plant, which is situated at Grand Quevilly (near Rouen), consists of: 1 - A primary sodium loop made up of a sodium re-heater running on heavy diesel oil, a mechanical pump and an intermediate exchanger made up of clusters of tubes fitted with baffles. 2 - A NaK(56 per cent of K) secondary loop consisting mainly of a mechanical pump and a double-wall steam generator with forced circulation and complete vaporization. 3 - A tertiary water loop consisting of the inside of the steam generator pipes, a pressure-reducing valve which cools down the super-heated fluid and acts as a turbine, a condenser, a charge-pump and a supply pump for the boiler. The heat is given finally to a water-source flowing into the Seine. Two important points of the installation are: - The water treatment unit - The control and regulation system Apart from the general satisfactory operation of the installation which it is hoped to obtain, a careful study will be made of the heat transmission coefficients of the important equipment such as the intermediate exchanger and the steam generator. The construction was finished on April 28, 1964. (author) [fr

  19. IEEE Std 381-1977: IEEE standard criteria for type tests of Class 1E modules used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes the basic requirements of a type test program with the objective of verifying that a module used as Class 1E equipment in a nuclear power generating station meets or exceeds its design specifications. This document is limited to class 1E modules from and including the sensor through the logic circuitry of the final actuation devices. Except for those that are part of a module, switchgear, cables, connections, motors, valve actuators, station batteries, and penetrations are not included and are covered by other IEEE documents. The purpose of this document is to supplement the procedures and requirements given in IEEE Std 323-1974 [24] for type testing Class 1E modules, thereby providing directions for establishment of a type test program which will obtain the required test data and yield the required documentation of test methods and results. This standard is structured to present to the user the principal performance characteristics and environmental parameters which must be considered in designing a type test program for any give Class 1E module. These modules range from tiny sensors to complete racks or cabinets full of equipment that may be located inside or outside containment. The Class 1E modules are required to perform their function before, during, or after, or all, any design basis event specified for the module. The vast variety of modules covered by this document precludes the listing here of specific requirements for each type test

  20. Water safety near hydro generating stations: pictographic warning signs. Phase 2 of CEA No. 9110 G-31

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    There has been concern about the effectiveness of safety signage for persons using lands and waters near hydro-electric generating plants for recreational purposes. Safety signs showing animated cartoon figures were evaluated for comprehension and acceptance. Groups evaluating the effectiveness of signs included youth, English as a second language groups,, literacy-impaired, recent immigrant and native groups. Approximately ten different hazardous or potentially dangerous scenarios were presented. For most of the scenarios, at least 75 percent comprehension of signs without words was achieved. For some signs without words, comprehension levels were less satisfactory, despite improvements in graphics. Guidelines and recommendations for developing and using the signs were included in the report

  1. Safety Evaluation Report related to the operation of Wolf Creek Generating Station, Unit No. 1 (Docket No. STN 50-482). Supplement No. 5

    International Nuclear Information System (INIS)

    1985-03-01

    This report supplements the Safety Evaluation Report (SER) for the application filed by the Kansas Gas and Electric Company, as applicant and agent for the owners, for a license to operate the Wolf Creek Generating Station, Unit 1 (Docket No. STN 50-482). The facility is located in Coffey County, Kansas. This supplement has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information regarding resolution of the open items identified in the SER. Because of the favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  2. IEEE C37.82-1987: IEEE standard for the qualification of switchgear assemblies for Class 1E applications in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes the methods and requirements for qualifying switchgear assemblies for indoor areas outside of the containment in nuclear power generating stations. These assemblies include (1) metal-enclosed low-voltage power circuit breaker switchgear assemblies, as defined in ANSI/IEEE C37.20.1-1987, (2) metal-clad switchgear assemblies, as defined in ANSI/IEEE C37.20.2-1987, (3) metal-enclosed bus, as defined in ANSI/IEEE C37.23-1987, and (4) metal-enclosed interrupter switchgear assemblies, as defined in ANSI/IEEE C37.20.3-1987. The purpose of this document is to provide amplification of the general requirements of ANSI/IEEE Std 323-1983 as they apply to the specific features of Class 1E switchgear assemblies. Where differences exist between this document and ANSI/IEEE Std 323-1983, this document takes precedence insofar as switchgear assemblies are concerned

  3. Revised draft environmental statement related to construction of Atlantic Generating Station Units 1 and 2 (Docket Nos. STN 50-477 and STN 50-478)

    International Nuclear Information System (INIS)

    1976-10-01

    The proposed action is the issuance of a construction permit to Public Service Electric and Gas Company (PDE and G) for the construction of the Atlantic Generating Station (AGS), Units 1 and 2. The AGS is the first nuclear power station in the United States proposed for construction in the offshore waters on the continental shelf. The AHS will be located in the Atlantic Ocean 2.8 miles offshore of Atlantic and Ocean countries. New Jersey, 11 miles northeast of Atlantic City, and will consist of two floating nuclear power plants enclosed in a protective rubble-mound breakwater. Both plants will be identical, of standardized design, and will employ pressurized water reactors to produce up to approximately 3425 megawatts thermal (MWt) each. Steam turbine generators will use this heat to produce up to approximately 1150 megawatts of electrical power (MWe) per unit. The main condensers will be cooled by the flow of seawater drawn from within the breakwater and discharged shoreward and external to the breakwater. This statement identifies various environmental aspects and potential adverse effects associated with the construction and operation of the AGS. Based upon an approximate two-year review period which included a multidisciplined assessment of extensive survey and modeling data, these effects are considered by the staff to be of a generally acceptable nature. Breakwater construction will result in the destruction of 100 acres of benthic infauna (burrowing animals) and the development of a reef-type community on the breakwater. The production of new biomass (standing crop) by the reef community is expected to compensate for the infaunal biomass destroyed by dredging and will contribute mainly to the local sport fishery. 93 figs., 110 tabs

  4. Fire Stations

    Data.gov (United States)

    Department of Homeland Security — Fire Stations in the United States Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their...

  5. Inertial-confinement fusion central-station electric-power-generating plant. Final report, March 1, 1979-September 30, 1980

    International Nuclear Information System (INIS)

    Sucov, E.W.

    1981-01-01

    This report contains a complete description of the subsystems of the power plant including driver, driver power supply, pellet fabrication, pellet injection and aiming, data handling and control, evacuation, tritium and radwaste handling, first wall protection, first wall and structure, heat removal, tritium breeding and neutron shielding, maintenance and repair and balance of plant. In addition, it contains analytic support for the conceptual designs developed for each subsystem. The emphasis of the effort was on designing a viable reactor cavity and on solving the problems of interfacing the driver systems with the reactor cavity. The reactors generate 3500 MWt by irradiating a pellet whose gain is 175 from two opposite sides with a total of 2 MJ driver energy at a 10 Hz repetition rate. Because the nominal laser driver efficiency is 10% and that for the heavy ion driver is 30%, the net electric power outputs are 1207 MWe and 1346 MWe; the net plant conversion efficiencies are 28.1% and 31.3%; and the recirculating fractions are 22.9% and 14.0% respectively. The increased power output is, however, only one of the factors considered by utilities in performing a cost minimization analysis of competing power sources for system expansion. These other factors include: capital costs, cost of construction time, operating costs, environmental and licensing costs and reliability cost

  6. Selective analysis of power plant operation on the Hudson River with emphasis on the Bowline Point Generating Station. Volume 2

    International Nuclear Information System (INIS)

    Barnthouse, L.W.; Cannon, J.B.; Christensen, S.G.

    1977-07-01

    Because of the location of the Bowline, Roseton, and Indian Point power generating facilities in the low-salinity zone of the Hudson estuary, operation of these plants with the present once-through cooling systems will adversely influence the fish populations that use the area for spawning and initial periods of growth and development. Recruitment rates and standing crops of several fish species may be lowered in response to the increased mortality caused by entrainment of nonscreenable eggs and larvae and by impingement of screenable young of the year. Entrainment and impingement data are particularly relevant for assessing which fish species have the greatest potential for being adversely affected by operation of Bowline, Roseton, and Indian Point with once-through cooling. These data from each of these three plants suggest that the six species that merit the greatest consideration are striped bass, white perch, tomcod, alewife, blueback herring, and bay anchovy. Two points of view are available for assessing the relative importance of the fish species in the Hudson River. From the fisheries point of view, the only two species of major importance are striped bass and shad. From the fish-community and ecosystem point of view, the dominant species, as determined by seasonal and regional standing crops (in numbers and biomass per hectare), are the six species most commonly entrained and impinged, namely, striped bass, white perch, tomcod, alewife, blueback herring, and anchovy

  7. Inertial-confinement fusion central-station electric-power-generating plant. Final report, March 1, 1979-September 30, 1980

    International Nuclear Information System (INIS)

    Sucov, E.W.

    1981-01-01

    This report contains a complete description of the subsystems of the power plant including driver, driver power supply, pellet fabrication, pellet injection and aiming, data handling and control, evacuation, tritium and radwaste handling, first wall protection, first wall and structure, heat removal, tritium breeding and neutron shielding, maintenance and repair and balance of plant. In addition, it contains analytic support for the conceptual designs developed for each subsystem. The emphasis of the effort was on designing a viable reactor cavity and on solving the problems of interfacing the driver systems with the reactor cavity. The reactors generate 3500 NWt by irradiating a pellet whose gain is 175 from two opposite sides with a total of 2 MJ driver energy at a 10 Hz repetition rate. Because the nominal laser driver efficiency is 10% and that for the heavy ion driver is 30%, the net electric power outputs are 1207 MWe and 1346 MWe; the net plant conversion efficiencies are 28.1% and 31.3%; and the recirculating fractions are 22.9% and 14.0% respectively. The increased power output is, however, only one of the factors considered by utilities in performing a cost minimization analysis of competing power sources for system expansion. These other factors include: capital costs, cost of construction time, operating costs, environmental and licensing costs and reliability cost

  8. Seasonal distribution and abundance of Ohio River fishes at the J.M. Stuart Electric Generating Station

    International Nuclear Information System (INIS)

    Yoder, C.O.; Gammon, J.R.

    1976-01-01

    Distributions of Ohio River fishes were studied in the vicinity of a 2400-Mw coal-fired electric generating plant. Three thermally elevated zones, two ambient river zones, and a backwater zone were sampled intensively from June 1974 through February 1975 following the completion of all four units of the power plant. Less intensive collections were made preceding and during construction from 1970 to 1973. Overall variations in water temperature in 1974 to 1975 ranged from 6 to 40 0 C in the heated zones, 4 to 30 0 C in the ambient river zones, and 5 to 27 0 C in the backwater zone. Seasonal and spatial differences in abundance, diversity, and faunal associations were largely influenced by temperature. Notable changes in species populations from 1970 to 1975 were observed which were attributed to power-plant operation. Although seasonal definitions in terms of summer, fall, and winter were generally used, they were of very limited value, as demonstrated by annual fluctuations in community parameters. Apparently near-freezing temperatures in the ambient river zones, as well as high summer temperatures in the effluent canal, limit the time fish can spend in these areas and force them to seek more hospitable temperatures. This suggests that there are critical winter as well as summer months, with spring/fall transitional periods in between in the vicinity of thermal effluents

  9. Environmental radiological studies conducted during 1986 in the vicinity of the Rancho Seco Nuclear Power Generating Station

    International Nuclear Information System (INIS)

    Noshkin, V.E.; Wong, K.M.; Eagle, R.J.; Brunk, J.L.; Jokela, T.A.

    1987-03-01

    This report summarizes the information compiled in 1986 for our assessment of the environmental impact of radionuclides discharged with aqueous releases from the Rancho Seco Nuclear Power Generating Plant. In October 1984, a liquid-effluent control program was initiated that significantly reduced the quantities of radionuclides discharged with liquid waste from the plant. However, results from our sampling program in 1986 indicate that previously discharged radionuclides persist in the downstream environment and are found in many aquatic dietary components although at concentrations much lower than those measured in 1984 and 1985. The greatly reduced activities in the dietary components from the aquatic environment attest to the effectiveness of the liquid-effluent control program. Concentrations in the flesh of fish from the creeks have decreased over time and with distance from the plant outfall. The mean concentration of 137 Cs in fish collected from Laguna Creek at locations more than 7.5 km from Rancho Seco is now comparable to the concentration determined in fresh-water fish randomly selected from Chicago, Illinois, markets. By August 1986, the mean concentration of 137 Cs in the flesh of bluegill had fallen to 7% of the concentration measured in fish from comparable locations in 1984 and was 30% of the mean concentration measured in these fish during August 1985. Stable potassium in the water plays a major role in the accumulation of 137 Cs by fish. Concentrations of 137 Cs in the surface sections of creek sediments also declined between the end of 1984 and 1986 with an effective half-life of approximately 2 y. Surface soils collected around a perimeter 11 km from Rancho Seco and from ranchlands closer to the plant showed only concentrations of 137 Cs originating from global fallout. Soils previously irrigated with Clay Creek water retain levels of both 134 Cs and 137 Cs

  10. Evaluation of a main steam line break with induced, multiple tube ruptures: A comparison of NUREG 1477 (Draft) and transient methodologies Palo Verde Nuclear Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, K.R.

    1995-09-01

    This paper presents the approach taken to analyze the radiological consequences of a postulated main steam line break event, with one or more tube ruptures, for the Palo Verde Nuclear Generating Station. The analysis was required to support the restart of PVNGS Unit 2 following the steam generator tube rupture event on March 14, 1993 and to justify continued operation of Units 1 and 3. During the post-event evaluation, the NRC expressed concern that Unit 2 could have been operating with degraded tubes and that similar conditions could exist in Units 1 and 3. The NRC therefore directed that a safety assessment be performed to evaluate a worst case scenario in which a non-isolable main steam line break occurs inducing one or more tube failures in the faulted steam generator. This assessment was to use the generic approach described in NUREG 1477, Voltage-Based Interim Plugging Criteria for Steam Generator Tubes - Task Group Report. An analysis based on the NUREG approach was performed but produced unacceptable results for off-site and control room thyroid doses. The NUREG methodology, however, does not account for plant thermal-hydraulic transient effects, system performance, or operator actions which could be credited to mitigate dose consequences. To deal with these issues, a more detailed analysis methodology was developed using a modified version of the Combustion Engineering Plant Analysis Code, which examines the dose consequences for a main steam line break transient with induced tube failures for a spectrum equivalent to 1 to 4 double ended guillotine U-tube breaks. By incorporating transient plant system responses and operator actions, the analysis demonstrates that the off-site and control room does consequences for a MSLBGTR can be reduced to acceptable limits. This analysis, in combination with other corrective and recovery actions, provided sufficient justification for continued operation of PVNGS Units 1 and 3, and for the subsequent restart of Unit 2.

  11. Evaluation of a main steam line break with induced, multiple tube ruptures: A comparison of NUREG 1477 (Draft) and transient methodologies Palo Verde Nuclear Generating Station

    International Nuclear Information System (INIS)

    Parrish, K.R.

    1995-01-01

    This paper presents the approach taken to analyze the radiological consequences of a postulated main steam line break event, with one or more tube ruptures, for the Palo Verde Nuclear Generating Station. The analysis was required to support the restart of PVNGS Unit 2 following the steam generator tube rupture event on March 14, 1993 and to justify continued operation of Units 1 and 3. During the post-event evaluation, the NRC expressed concern that Unit 2 could have been operating with degraded tubes and that similar conditions could exist in Units 1 and 3. The NRC therefore directed that a safety assessment be performed to evaluate a worst case scenario in which a non-isolable main steam line break occurs inducing one or more tube failures in the faulted steam generator. This assessment was to use the generic approach described in NUREG 1477, Voltage-Based Interim Plugging Criteria for Steam Generator Tubes - Task Group Report. An analysis based on the NUREG approach was performed but produced unacceptable results for off-site and control room thyroid doses. The NUREG methodology, however, does not account for plant thermal-hydraulic transient effects, system performance, or operator actions which could be credited to mitigate dose consequences. To deal with these issues, a more detailed analysis methodology was developed using a modified version of the Combustion Engineering Plant Analysis Code, which examines the dose consequences for a main steam line break transient with induced tube failures for a spectrum equivalent to 1 to 4 double ended guillotine U-tube breaks. By incorporating transient plant system responses and operator actions, the analysis demonstrates that the off-site and control room does consequences for a MSLBGTR can be reduced to acceptable limits. This analysis, in combination with other corrective and recovery actions, provided sufficient justification for continued operation of PVNGS Units 1 and 3, and for the subsequent restart of Unit 2

  12. The role of the demand-duration curve in the evaluation of power station installation policies. Remarks on its effects on stations' utilization, generating capacity, load factor history and consumptions

    International Nuclear Information System (INIS)

    Graziani, G.; Maineri, M.; Zanantoni, C.

    1976-12-01

    The role of the load-duration curve in determining the installation policy for an electric power system, is examined. The effect of the priority order for the allocation of the power stations in the load-diagram is also discussed: in the model used here (program TOTEM) this priority is given as a function of type and age of the station. The significance of the load factor history for a power station as a function of its age is also discussed. It is suggested that such a curve be deduced as a result of strategy calculations made with TOTEM rather than assumping it as input data

  13. Improving nuclear utility generation capacity, understanding the sources of forced outage and learning how to prevent them

    International Nuclear Information System (INIS)

    Brodeur, D.L.; Todreas, N.E.; Angus, V.T.

    1998-01-01

    MIT and PECO Energy have completed a detailed examination of the sources of forced outages at the Limerick Generating Station (LGS) Boiling Water Reactor Class IV (BWR IV) site over a five year period and contrasted that information to similar BWR IV utilities in the United States over the same period. Each forced outage was attributed to one system and assigned causal codes of equipment versus human factors and failure attributes such as weak design, poor craftsmanship, and worn parts. It was found that fifty four percent of the lost power at LGS was the result of Balance of Plant failures. Industry wide data identifies fifty nine percent of the lost power as attributed to Balance of Plant failures. Balance of Plant systems are those systems not included in the primary and safety related system category. Considering failure causal factors, forty six percent of the lost power at the utility under study was the result of equipment factors such as weak design or worn parts. Significantly, the study showed a high variance between those systems which caused significant forced outage at the two sister LGS units. This demonstrated the infrequent nature of plant forced outages within a given system. This was supported by the observation that dominant systems attributing to forced outage at LGS were not equally represented in industry data. It is suggested that for individual utilities to dramatically improve unit capability factors with regard to Balance of Plant systems, they must learn from industry wide experiences and develop cooperative means of exchanging lessons learned among similarly designed plants and systems. With the broad knowledge base of system failures, current designs must be frequently assessed and altered until each system poses an acceptable level of risk to generation capacity. (author)

  14. [STEM on Station Education

    Science.gov (United States)

    Lundebjerg, Kristen

    2016-01-01

    The STEM on Station team is part of Education which is part of the External Relations organization (ERO). ERO has traditional goals based around BHAG (Big Hairy Audacious Goal). The BHAG model is simplified to a saying: Everything we do stimulates actions by others to advance human space exploration. The STEM on Station education initiate is a project focused on bringing off the earth research and learning into classrooms. Educational resources such as lesson plans, activities to connect with the space station and STEM related contests are available and hosted by the STEM on Station team along with their partners such as Texas Instruments. These educational activities engage teachers and students in the current happenings aboard the international space station, inspiring the next generation of space explorers.

  15. Amtrak Stations

    Data.gov (United States)

    Department of Homeland Security — Updated database of the Federal Railroad Administration's (FRA) Amtrak Station database. This database is a geographic data set containing Amtrak intercity railroad...

  16. Microbial Challenge Testing of Single Liquid Cathode Feed Water Electrolysis Cells for the International Space Station (ISS) Oxygen Generator Assembly (OGA)

    Science.gov (United States)

    Roy, Robert J.; Wilson, Mark E.; Diderich, Greg S.; Steele, John W.

    2011-01-01

    The International Space Station (ISS) Oxygen Generator Assembly (OGA) operational performance may be adversely impacted by microbiological growth and biofilm formation over the electrolysis cell membranes. Biofilms could hinder the transport of water from the bulk fluid stream to the membranes and increase the cell concentration overpotential resulting in higher cell voltages and a shorter cell life. A microbial challenge test was performed on duplicate single liquid-cathode feed water electrolysis cells to evaluate operational performance with increasing levels of a mixture of five bacteria isolated from ISS and Space Shuttle potable water systems. Baseline performance of the single water electrolysis cells was determined for approximately one month with deionized water. Monthly performance was also determined following each inoculation of the feed tank with 100, 1000, 10,000 and 100,000 cells/ml of the mixed suspension of test bacteria. Water samples from the feed tank and recirculating water loops for each cell were periodically analyzed for enumeration and speciation of bacteria and total organic carbon. While initially a concern, this test program has demonstrated that the performance of the electrolysis cell is not adversely impacted by feed water containing the five species of bacteria tested at a concentration measured as high as 1,000,000 colony forming units (CFU)/ml. This paper presents the methodologies used in the conduct of this test program along with the performance test results at each level of bacteria concentration.

  17. Integrated plant safety assessment: Systematic Evaluation Program, San Onofre Nuclear Generating Station, Unit 1 (Docket No. 50-206): Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues; (2) a basis for deciding on how these differences should be resolved in an integrated plant review; and (3) a documented evaluation of plant safety. This report documents the review of San Onofre Nuclear Generating Station, Unit 1, operated by Southern California Edison Company. The San Onofre plant is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. This report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license. This report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the draft report issued in April 1985

  18. Marble Hill Nuclear Generating Station, Units 1 and 2: Final environmental statement (Docket Nos. STN 50-546 and STN 50-547)

    International Nuclear Information System (INIS)

    1976-09-01

    The proposed action is the issuance of construction permits to the Public Service Company of Indiana, Inc., Northern Indiana Public Service Company, Inc., East Kentucky Power Cooperative, Inc., and Wabash Valley Power Association for the construction of the Marble Hill Nuclear Generating Station, Units 1 and 2 (MH 1and2). The 987-acre site is predominately forest and cropland. Construction-related activities on the site would disturb about 250 acres. The portion of this land not be used for the plant facilities, parking lots, roads, etc., will be restored by seeding and landscaping. The temporary removal of vegetation will tend to promote erosion. Increased siltation and turbidity can be expected in local streams during construction, but measures will be taken to minimize these effects. A maximum of 69 cfs of cooling water will be withdrawn from the Ohio River of which cfs will be returned to the river via pipeline with the dissolved solids concentration increased by a factor of about 6. About cfs will be evaporated to the atmosphere by the cooling towers. The volume of discharge (9 cfs) is very small compared with the river flow (annual mean is about 110,000 cfs) and the thermal effect on the river ecosystem is not expected to be significant. Chemical discharges from the plant will be diluted to concentrations below those which might adversely affect aquatic biota. The risk associated with accidental radiation exposure will be very low. 43 figs., 115 tabs

  19. Integrated plant safety assessment: systematic evaluation program. Oyster Creek nuclear generating station. GPU Nuclear Corporation and Jersey Central Power and Light Company. Docket No. 50-219

    International Nuclear Information System (INIS)

    1982-09-01

    The Systematic Evaluation Program was initiated in February 1978 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the Oyster Creek Nuclear Generating Station (located in Ocean County, New Jersey), one of ten plants reviewed under Phase II of this program, and indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

  20. Safety Evaluation Report related to the restart of Rancho Seco Nuclear Generating Station, Unit 1, following the event of December 26, 1985 (Docket No. 50-312)

    International Nuclear Information System (INIS)

    1987-10-01

    On December 26, 1985, the Rancho Seco Nuclear Generating Station, owned and operated by the Sacramento Municipal Utility District (SMUD), experienced a loss of dc power within the integrated control system (ICS) while the plant was at 76% power. The ensuing reactor trip was followed by a rapid overcooling transient and automatic initiation of the safety features actuation system (SFAS). The overcooling transient continued until ICS dc power was restored 26 minutes after its loss. Two letters from the NRC Region V Administrator (dated December 26, 1985) confirmed that the Rancho Seco plant would not be returned to power operation until SMUD (the licensee) had provided the NRC with an assessment of the root cause of the transient and a justification as to why the Rancho Seco facility is ready to resume power operation. In response, the licensee submitted the ''Rancho Seco Action Plan for Performance Improvement'' on July 3, 1986; revisions to that action plan were submitted on December 15, 1986 and February 28, 1987. The NRC staff has reviewed the action plan and numerous other supporting documents submitted by the licensee. The staff's evaluation of the information supporting restart of Rancho Seco is presented in this safety evaluation report

  1. Summary of public participation : Environmental impact assessment : Proposal by the New Brunswick Power Commission to refurbish the Coleson Cove generating station

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-09-01

    A proposal was made by New Brunswick (NB) Power for the refurbishment of the Coleson Cove generating station, to the Public Utilities Board (PUB). It was determined by the PUB that a requirement existed for 1050 megawatt (MW) of power at Coleson Cove. This document presented a summary of public participation. Two meetings were held in support of the Environmental Impact Assessment (EIA). Several concerns were raised by various groups at both meetings. Some of the issues discussed included: (1) Orimulsion{sup R} fuel, reputed to be the dirtiest fuel in the world, (2) fuel supply, (3) project agenda, (4) project costs and others. It appeared that most of the participants in the public consultation process were against the proposal. It was felt that the emissions of sulphur dioxide and nitrous oxide should be considered in the greater context of reducing present and future emissions of greenhouse gases. The participants recommended that the New Brunswick government support a 400 MW combined cycle natural gas turbine unit instead of the proposal under review. Much opposition to the project concerned the potential degradation of the environment and the health of the citizens. Environmental representatives were concerned since the Solid Waste Management Area would be located in the vicinity of a proposed marine and wildlife sanctuary. Industry representatives were eager for the opportunities offered by the proposal. refs.

  2. The Current Status of the Space Station Biological Research Project: a Core Facility Enabling Multi-Generational Studies under Slectable Gravity Levels

    Science.gov (United States)

    Santos, O.

    2002-01-01

    The Space Station Biological Research Project (SSBRP) has developed a new plan which greatly reduces the development costs required to complete the facility. This new plan retains core capabilities while allowing for future growth. The most important piece of equipment required for quality biological research, the 2.5 meter diameter centrifuge capable of accommodating research specimen habitats at simulated gravity levels ranging from microgravity to 2.0 g, is being developed by NASDA, the Japanese space agency, for the SSBRP. This is scheduled for flight to the ISS in 2007. The project is also developing a multi-purpose incubator, an automated cell culture unit, and two microgravity habitat holding racks, currently scheduled for launch in 2005. In addition the Canadian Space Agency is developing for the project an insect habitat, which houses Drosophila melanogaster, and provides an internal centrifuge for 1 g controls. NASDA is also developing for the project a glovebox for the contained manipulation and analysis of biological specimens, scheduled for launch in 2006. This core facility will allow for experimentation on small plants (Arabidopsis species), nematode worms (C. elegans), fruit flies (Drosophila melanogaster), and a variety of microorganisms, bacteria, yeast, and mammalian cells. We propose a plan for early utilization which focuses on surveys of changes in gene expression and protein structure due to the space flight environment. In the future, the project is looking to continue development of a rodent habitat and a plant habitat that can be accommodated on the 2.5 meter centrifuge. By utilizing the early phases of the ISS to broadly answer what changes occur at the genetic and protein level of cells and organisms exposed to the ISS low earth orbit environment, we can generate interest for future experiments when the ISS capabilities allow for direct manipulation and intervention of experiments. The ISS continues to hold promise for high quality, long

  3. Final environmental statement related to the proposed construction of Douglas Point Nuclear Generating Station, Units 1 and 2: (Docket Nos. 50-448 and 50-449)

    International Nuclear Information System (INIS)

    1976-03-01

    The proposed action is the issuance of construction permits to the Potomac Electric Power Company for the construction of the Douglas Point Nuclear Generating Station, Units 1 and 2, located in Charles County, Maryland. The exhaust steam will be cooled via a closed-cycle mode incorporating natural-draft wet cooling towers. The water used in the cooling system will be obtained from the Potomac River. Construction-related activities on the site will convert about 290 acres of the 1390 acres of forested land at the Douglas Point site to industrial use. In addition to acreage at the site, approximately 4.5 miles of transmission corridor will require about 211 acres of land for rights-of-way. This corridor will connect with 27 miles of existing rights-of-way over which a line connecting Possum Point to Burches Hill has already been approved. The installation of new transmission line, uniquely identified with Douglas Point, along the existing right-of-way will involve approximately 464 additional acres. As described in the application, the maximum river water intake will be about 97,200 gpm. Of this, a maximum of about 28,000 gpm will be lost in drift or evaporation from the cooling towers. About 700 gpm maximum of fresh well water will be consumed. It is conservatively assumed that all aquatic organisms entrained in the service water system will be killed due to thermal and mechanical shock. It is further estimated that at 97,200 gpm maximum total river water intake, the maximum impact on the striped bass fishery will be a reduction of <5%. The risk associated with accidental radiation exposure is very low. 32 figs., 59 tabs

  4. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  5. The Staffing of Central Electricity Generating Board Nuclear Power Stations; Organigramme des centrales nucleaires du central electricity generating board; Politika v oblasti kadrov na atomnykh ehlektrostantsiyakh CEGB; El personal de las plantas nucleoelectricas de la central electricity generating board.

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, J. S.; Shepherd, G. T. [Central Electricity Generating Board, Western Division, Bristol (United Kingdom)

    1963-10-15

    An account is given of the staffing requirements and organization at a CEBG nuclear power station. The training of staff and licensing requirements for reactoroperating staff are discussed. Experience gained to data of the outcome of pre-operating training and detailed planning in the operational sphere is given. (author) [French] Le memoire donne un apercu de l'organigramme d'une centrale nucleaire du CEGB et des conditions auxquelles doit satisfaire le personnel (formation, qualifications requises pour la fonction d'operateur). Il rend compte egalement de l'experience acquise a ce jour quant a l'interet qu'il y a a former le personnel au prealable et a etablir des plans d'operation detailles. (author) [Spanish] La memoria informa sobre la organizacion de las centrales nucleoelectricas de la CEGB y sobre la plantilla de personal que estas requieren. Discute la formacion del personal y los requisitos para obtener la licencia de operador de reactores. Describe la experiencia adquirida hasta el presente en materia de formacion previa del personal y de organizacion detallada de las operaciones. (author) [Russian] Daetsya otchet o trebovaniyakh, pred{sup y}avlyaemykh k personalu, i organizatsiya nabora personala na atomnykh ehlektrostantsiyakh Tsentral'nogo upravleniya proizvodstva ehlektroehnergii (CEGB). Obsuzhdayutsya voprosy podgotovki personala i normativnykh trebovanij, pred{sup y}avlyaemykh k ehkspluatatsionnomu personalu. Izlagaetsya opyt, nakoplennyj k nastoyashchemu vremeni v rezul'tate osushchestvleniya predehkspluatatsionnoj podgotovki i podrobnogo planirovaniya v usloviyakh ehkspluatatsii. (author)

  6. Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529 and STN 50-530): Draft supplement to the Final environmental satement

    International Nuclear Information System (INIS)

    1975-11-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be permanently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects. Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do result from the proposed action. The pumping of groundwater will cause a local drawdown of about 1 ft/yr, less than that currently occurring; hence, the impact is considered acceptable. 1 fig., 20 tabs

  7. UMTS Network Stations

    Science.gov (United States)

    Hernandez, C.

    2010-09-01

    The weakness of small island electrical grids implies a handicap for the electrical generation with renewable energy sources. With the intention of maximizing the installation of photovoltaic generators in the Canary Islands, arises the need to develop a solar forecasting system that allows knowing in advance the amount of PV generated electricity that will be going into the grid, from the installed PV power plants installed in the island. The forecasting tools need to get feedback from real weather data in "real time" from remote weather stations. Nevertheless, the transference of this data to the calculation computer servers is very complicated with the old point to point telecommunication systems that, neither allow the transfer of data from several remote weather stations simultaneously nor high frequency of sampling of weather parameters due to slowness of the connection. This one project has developed a telecommunications infrastructure that allows sensorizadas remote stations, to send data of its sensors, once every minute and simultaneously, to the calculation server running the solar forecasting numerical models. For it, the Canary Islands Institute of Technology has added a sophisticated communications network to its 30 weather stations measuring irradiation at strategic sites, areas with high penetration of photovoltaic generation or that have potential to host in the future photovoltaic power plants connected to the grid. In each one of the stations, irradiance and temperature measurement instruments have been installed, over inclined silicon cell, global radiation on horizontal surface and room temperature. Mobile telephone devices have been installed and programmed in each one of the weather stations, which allow the transfer of their data taking advantage of the UMTS service offered by the local telephone operator. Every minute the computer server running the numerical weather forecasting models receives data inputs from 120 instruments distributed

  8. Station Capacity

    DEFF Research Database (Denmark)

    Landex, Alex

    2011-01-01

    the probability of conflicts and the minimum headway times into account. The last method analyzes how optimal platform tracks are used by examining the arrival and departure pattern of the trains. The developed methods can either be used separately to analyze specific characteristics of the capacity of a station......Stations are often limiting the capacity of railway networks. This is due to extra need of tracks when trains stand still, trains turning around, and conflicting train routes. Although stations are often the capacity bottlenecks, most capacity analysis methods focus on open line capacity. Therefore...... for platform tracks and the probability that arriving trains will not get a platform track immediately at arrival. The third method is a scalable method that analyzes the conflicts in the switch zone(s). In its simplest stage, the method just analyzes the track layout while the more advanced stages also take...

  9. Final supplement to the final environmental statement related to construction of Palo Verde Nuclear Generating Station Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1976-02-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do results from the proposed action. 26 refs., 1 fig., 20 tabs

  10. A designated centre for people with disabilities operated by Daughters of Charity Disability Support Services Ltd., Limerick

    LENUS (Irish Health Repository)

    Billington, Jennifer

    2012-08-07

    AbstractBackgroundThe STRATIFY score is a clinical prediction rule (CPR) derived to assist clinicians to identify patients at risk of falling. The purpose of this systematic review and meta-analysis is to determine the overall diagnostic accuracy of the STRATIFY rule across a variety of clinical settings.MethodsA literature search was performed to identify all studies that validated the STRATIFY rule. The methodological quality of the studies was assessed using the Quality Assessment of Diagnostic Accuracy Studies tool. A STRATIFY score of ≥2 points was used to identify individuals at higher risk of falling. All included studies were combined using a bivariate random effects model to generate pooled sensitivity and specificity of STRATIFY at ≥2 points. Heterogeneity was assessed using the variance of logit transformed sensitivity and specificity.ResultsSeventeen studies were included in our meta-analysis, incorporating 11,378 patients. At a score ≥2 points, the STRATIFY rule is more useful at ruling out falls in those classified as low risk, with a greater pooled sensitivity estimate (0.67, 95% CI 0.52–0.80) than specificity (0.57, 95% CI 0.45 – 0.69). The sensitivity analysis which examined the performance of the rule in different settings and subgroups also showed broadly comparable results, indicating that the STRATIFY rule performs in a similar manner across a variety of different ‘at risk’ patient groups in different clinical settings.ConclusionThis systematic review shows that the diagnostic accuracy of the STRATIFY rule is limited and should not be used in isolation for identifying individuals at high risk of falls in clinical practice.

  11. Safety evaluation report related to steam generator tube repair and return to operation Three Mile Island Nuclear Station, Unit No. 1 (Docket No. 50-289)

    International Nuclear Information System (INIS)

    Silver, H.

    1983-11-01

    Based on our evaluation of the steam generator tube repair method and of subsequent operation using the repaired steam generators, we conclude that the steam generator tube kinetic expansion process is acceptable, that applicable GDC have been met, and that there is reasonable assurance that the health and safety of the public will not be endangered by subsequent operation of the plant

  12. Socioeconomic impacts of nuclear generating stations: Crystal River Unit 3 case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Bergmann, P.A.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Crystal River Unit 3 nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  13. Personnel training at EDF's nuclear and fossil generation division and its application for the personnel of a nuclear power station abroad

    International Nuclear Information System (INIS)

    Rabouhams, J.

    1991-01-01

    Safety in nuclear power stations relies so much upon human competence that the training of the personnel has to respond to the basic need of having personnel who are competent in their job permanently available. EDF has designed, organized and managed a large volume of training in order to provide its personnel involved in the operation of nuclear power station with initial training, training, retraining and improvement within the framework of quality organization. To deal with this training in the most efficient way EDF has developed various training aids ranging from booklets to fullscope simulator or fullscope mockups which are continually updated. All EDF experience has been used to train Daya Bay nuclear power plant personnel who have been monitored throughout the training programmes. Adequate safety conduct and attitudes including the socio-cultural background have been developed during the training. The principle teaching method was shadow training in other words the transfer in situ of knowledge, know how, and conduct from an experienced engineer. (author)

  14. Socioeconomic impacts of nuclear generating stations: Nine Mile Point and Fitzpatrick case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Branch, K.; Cochran, R.; Meale, R.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Nine Mile Point and Fitzpatrick nuclear power stations. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  15. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1984-10-01

    Supplement No. 6 to the Safety Evaluation Report for the application filed by Arizona Public Service Company, et al., for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 5 was issued and (2) matters that the staff had under review when Supplement No. 5 was issued

  16. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 7

    International Nuclear Information System (INIS)

    1984-12-01

    Supplement No. 7 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 6 was issued; and (2) matters that the staff had under review when Supplement No. 6 was issued

  17. 76 FR 52992 - Notice of Acceptance for Docketing of the Application and Notice of Opportunity for Hearing...

    Science.gov (United States)

    2011-08-24

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0166; Docket Numbers 50-352 and 50-353] Notice of Acceptance for Docketing of the Application and Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License Nos. NPF-39 and NPF-85 for an Additional 20-Year Period, Exelon Generation Company, LLC, Limerick Generating Station The U.S....

  18. Power station instrumentation

    International Nuclear Information System (INIS)

    Jervis, M.W.

    1993-01-01

    Power stations are characterized by a wide variety of mechanical and electrical plant operating with structures, liquids and gases working at high pressures and temperatures and with large mass flows. The voltages and currents are also the highest that occur in most industries. In order to achieve maximum economy, the plant is operated with relatively small margins from conditions that can cause rapid plant damage, safety implications, and very high financial penalties. In common with other process industries, power stations depend heavily on control and instrumentation. These systems have become particularly significant, in the cost-conscious privatized environment, for providing the means to implement the automation implicit in maintaining safety standards, improving generation efficiency and reducing operating manpower costs. This book is for professional instrumentation engineers who need to known about their use in power stations and power station engineers requiring information about the principles and choice of instrumentation available. There are 8 chapters; chapter 4 on instrumentation for nuclear steam supply systems is indexed separately. (Author)

  19. Lir Nursing Home, Tournafulla, Limerick.

    LENUS (Irish Health Repository)

    Prasad, Babu R

    2012-01-20

    Abstract Background The inherent toxicity of unmodified Quantum Dots (QDs) is a major hindrance to their use in biological applications. To make them more potent as neuroprosthetic and neurotherapeutic agents, thioglycolic acid (TGA) capped CdTe QDs, were coated with a gelatine layer and investigated in this study with differentiated pheochromocytoma 12 (PC12) cells. The QD - cell interactions were investigated after incubation periods of up to 17 days by MTT and APOTOX-Glo Triplex assays along with using confocal microscopy. Results Long term exposure (up to 17 days) to gelatinated TGA-capped CdTe QDs of PC12 cells in the course of differentiation and after neurites were grown resulted in dramatically reduced cytotoxicity compared to non-gelatinated TGA-capped CdTe QDs. Conclusion The toxicity mechanism of QDs was identified as caspase-mediated apoptosis as a result of cadmium leaking from the core of QDs. It was therefore concluded that the gelatine capping on the surface of QDs acts as a barrier towards the leaking of toxic ions from the core QDs in the long term (up to 17 days).

  20. Merchant funding for power stations

    International Nuclear Information System (INIS)

    Johnston, B.; Bartlam, M.

    1997-01-01

    The next frontier for project finance is merchant generation: the financing of IPPs without long-term offtake contracts. Banks are just beginning to finance merchant generation power stations. One of the first was Destec's Indian Queens project in Cornwall, UK. Bruce Johnston and Martin Bartlam of Wilde Sapte discuss the project. (UK)

  1. Ionosonde Stations

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ionograms are recorded tracings of reflected high frequency radio pulses generated by an ionosonde. Unique relationships exist between the sounding frequency and the...

  2. Results of Steam-Water-Oxygen Treatment of the Inside of Heating Surfaces in Heat-Recovery Steam Generators of the PGU-800 Power Unit at the Perm' District Thermal Power Station

    Science.gov (United States)

    Ovechkina, O. V.; Zhuravlev, L. S.; Drozdov, A. A.; Solomeina, S. V.

    2018-05-01

    Prestarting, postinstallation steam-water-oxygen treatment (SWOT) of the natural circulation/steam reheat heat-recovery steam generators (HRSG) manufactured by OAO Krasny Kotelshchik was performed at the PGU-800 power unit of the Perm District Thermal Power Station (GRES). Prior to SWOT, steam-oxygen cleaning, passivation, and preservation of gas condensate heaters (GCH) of HRSGs were performed for 10 h using 1.3MPa/260°C/70 t/h external steam. After that, test specimens were cut out that demonstrated high strength of the passivating film. SWOT of the inside of the heating surfaces was carried out during no-load operation of the gas turbine unit with an exhaust temperature of 280-300°C at the HRSG inlet. The steam turbine was shutdown, and the generated steam was discharged into the atmosphere. Oxygen was metered into the discharge pipeline of the electricity-driven feed pumps and downcomers of the evaporators. The behavior of the concentration by weight of iron compounds and the results of investigation of cutout specimens by the drop or potentiometric method indicate that the steam-water-oxygen process makes it possible to remove corrosion products and reduce the time required to put a boiler into operation. Unlike other processes, SWOT does not require metal-intensive cleaning systems, temporary metering stations, and structures for collection of the waste solution.

  3. Methodology for characterizing the environmental impacts of hydroelectric generating stations : a case study of Farmer Rapids; Methodologie d'acquisition des connaissances pour la gestion environnmentale de centrales hydroelectriques : cas de la centrale Rapides-Farmers, rivieres Gatineau

    Energy Technology Data Exchange (ETDEWEB)

    Lemieux, C.; Renaud, S.; Begin, P.; Belzile, L. [Genivar SEC, Quebec, PQ (Canada); Caumartin, J. [Hydro-Quebec, Montreal, PQ (Canada)

    2006-07-01

    This paper described a novel methodology used to characterize the downstream section of a generating station that was not navigable by boat. The method was used as part of a fish habitat characterization study conducted in the Farmers Rapids area of Quebec. The purpose of the study was to identify the discharges and water levels needed to preserve fish habitats in the region. Initially, experimental fishing was undertaken to locate, validate and characterize fish habitats. Habitat models were then developed using a microhabitat modelling method to establish pertinent discharges and water levels. In order to model areas that were not navigable by boat, discharges released by the generating station were reduced to a minimum to temporarily decrease water levels and expose the river. High definition aerial photography and topographic mapping was conducted. The information obtained from the 2 procedures was then used to describe and map the riverbed substrate as well as the bathymetry and aquatic habitats. A 2D hydrodynamic model was then used to simulate water flows in the area at various discharges. The results of the hydrodynamic models and the habitat models were then used to establish appropriate discharges for optimal fish habitats.

  4. Complementary cold water production for a dairy industry: the use of biogas generated in the effluent treatment station; Producao de agua gelada complementar para um laticinio: o uso do biogas produzido na estacao de tratamento de efluentes

    Energy Technology Data Exchange (ETDEWEB)

    Villela, I.A.C. [Faculdade de Engenharia Quimica de Lorena, SP (Brazil). Dept. de Matematica Aplicada]. E-mail: iraides@debas.faenquil.br; Napoleao, D.A.S.; Silveira, J.L. [UNESP, Guaratingueta, SP (Brazil). Dept. de Energia]. E-mails: diovana@feg.unesp.br; joseluz@feg.unesp.br

    2000-07-01

    In this paper is analysed the possibility energetic utilization of biogas in the effluent treatment station of a medium dairy industry located in Sao Paulo state, Brazil. In this station is produced about 80 N m3/h of biogas, with a molar composition of 62,5% of CH{sub 4}, 13,4% of N{sub 2}, 5% of CO, 2,4% of CO{sub 2}, 2,4% of steam H{sub 2}O e 14,1% of H{sub 2}S. The generated biogas is today burning in a flair, according the national rule, with evident losses of energetic utilization potential.. The purpose of this paper is the direct utilization of this biogas to run an absorption refrigeration system utilizing H{sub 2}O + NH{sub 3} mixture. The level of H{sub 2}S in the biogas permits the energy recovery of the available heating minimum temperature level up to 230 deg C, according to the pinch point proceeding.This potential of energy recovery permits a complementation of the cold water production (7,3 kg/s) at 1 deg C. So, is made the energetic analysis of the proposed installation showing the technical feasibility of the actual use of the generated biogas, to produce useful energy. (author)

  5. Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1982-02-01

    The proposed action is the issuance of operating licenses to the Arizona Public Service Company (APS, applicant) for the startup and operation of PVNGS, Units 1, 2, and 3, located in Maricopa County, about 24 km (15 mi) west of Buckeye, Arizona. The information in this statement represents the second assessment of the environmental impact associated with PVNGS Units 1, 2, and 3 pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations (10 CFR) Part 51 of the Commissions's Regulations. After receiving an application in July 1974 to construct this station, the staff carried out a review of impacts that would occur during its construction and operation. That evaluation was issued as a Final Environmental Statement/emdash/Construction Phase (FES-CP). After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Phoenix, Arizona, the US Nuclear Regulatory Commission issued Construction Permits Nos. CPPR-141, CPPR-142, and CPPR-143 for the construction of PVNGS Units 1, 2, and 3. As of September 1981, the construction of Unit 1 was about 92 percent complete, Unit 2 was 68 percent complete, and Unit 3 was 26 percent complete. 11 figs., 21 tabs

  6. Boxberg III-2 x 500 MW units: Refurbishing and environmental protection measures on the 815 T/H steam generator of works II in Boxberg Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Cossman, R.; Fritz, M.; Bauchmueller, R. [L& C Steinmueller GmbH, Gummersbach (Germany)

    1995-12-01

    The object of the upgrading measures on the steam generators is: (1) To comply with the requirements of the German antipollution law, which imposes a permissible NO{sub x} content in the flue gas of less than 200 Mg/m{sup 3} STP and a CO content of less than 250 Mg/m{sup 3} STP. (2) To increase the boiler efficiency and availability and the efficiency of the water/steam cycle.

  7. Report to the NRC on guidance for preparing scenarios for emergency preparedness exercises at nuclear generating stations. Draft report for comment

    International Nuclear Information System (INIS)

    Martin, G.F.; Hickey, E.E.; Moeller, M.P.; Schultz, D.H.; Bethke, G.W.

    1986-03-01

    A scenario guidance handbook was prepared to assist emergency planners in developing scenarios for emergency preparedness exercises at nuclear power plants. The handbook provides guidance for the development of the objectives of an exercise, the descriptions of scenario events and responses, and the instructions to the participants. Information concerning implementation of the scenario, critiques and findings, and generation and format of scenario data are also included. Finally, examples of manual calculational techniques for producing radiological data are included as an appendix

  8. Association of Exposure to Radio-Frequency Electromagnetic Field Radiation (RF-EMFR Generated by Mobile Phone Base Stations with Glycated Hemoglobin (HbA1c and Risk of Type 2 Diabetes Mellitus

    Directory of Open Access Journals (Sweden)

    Sultan Ayoub Meo

    2015-11-01

    Full Text Available Installation of mobile phone base stations in residential areas has initiated public debate about possible adverse effects on human health. This study aimed to determine the association of exposure to radio frequency electromagnetic field radiation (RF-EMFR generated by mobile phone base stations with glycated hemoglobin (HbA1c and occurrence of type 2 diabetes mellitus. For this study, two different elementary schools (school-1 and school-2 were selected. We recruited 159 students in total; 96 male students from school-1, with age range 12–16 years, and 63 male students with age range 12–17 years from school-2. Mobile phone base stations with towers existed about 200 m away from the school buildings. RF-EMFR was measured inside both schools. In school-1, RF-EMFR was 9.601 nW/cm2 at frequency of 925 MHz, and students had been exposed to RF-EMFR for a duration of 6 h daily, five days in a week. In school-2, RF-EMFR was 1.909 nW/cm2 at frequency of 925 MHz and students had been exposed for 6 h daily, five days in a week. 5–6 mL blood was collected from all the students and HbA1c was measured by using a Dimension Xpand Plus Integrated Chemistry System, Siemens. The mean HbA1c for the students who were exposed to high RF-EMFR was significantly higher (5.44 ± 0.22 than the mean HbA1c for the students who were exposed to low RF-EMFR (5.32 ± 0.34 (p = 0.007. Moreover, students who were exposed to high RF-EMFR generated by MPBS had a significantly higher risk of type 2 diabetes mellitus (p = 0.016 relative to their counterparts who were exposed to low RF-EMFR. It is concluded that exposure to high RF-EMFR generated by MPBS is associated with elevated levels of HbA1c and risk of type 2 diabetes mellitus.

  9. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  10. 78 FR 3473 - Advisory Committee on Reactor Safeguards; Notice of Meeting

    Science.gov (United States)

    2013-01-16

    ... Pike, Rockville, Maryland. Thursday, February 7, 2013, Conference Room T2-B1, 11545 Rockville Pike... Evaluation Report Associated with the License Renewal Application for the Limerick Generating Station, Units... of the NRC staff and Exelon Corporation regarding the final safety evaluation report associated with...

  11. Conventional and intelligent generalized supervisory control for combined cycle generating power stations.; Control supervisiorio generalizado convencional e inteligente para centrales de generacion de ciclo combinado

    Energy Technology Data Exchange (ETDEWEB)

    Martinez M, Miguel A; Sanchez P, Marino [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Gonzalez Rubio S, Jose L [Cento Nacional de Investigacion y Desarrollo Tecnologico (Cenidet), Cuernavaca, Morelos (Mexico)

    2005-07-01

    Under the expectations of expansion of electric power generation in Mexico, this work exposes the development of a conventional and intelligent generalized supervisory control (CSG) for a combined cycle generation power plant. This one allows to obtain the optimal operation of the power plant through the automatic starting of the generating units and to obtain the maximum possible amount of electrical power in automatic and safe form. For the development of the CSG a control loop by temperature was implemented for the gas turbine system and a control loop by strangled pressure for the gas turbine and a control loop by strangled pressure for the steam turbine. The design of these supervisory systems was made with base in the critical limits on the involved variables of the process: blading average temperature, for the gas turbine (GT) and strangled pressure for the steam turbine (ST) [Spanish] Bajo estas expectativas de expansion de generacion de energia en Mexico, este trabajo expone el desarrollo de un control supervisorio generalizado (CSG) para una central generacion de ciclo combinado. Este permite lograr la operacion optima de la planta a traves del arranque automatico de las unidades generadoras y obtener la maxima cantidad posible de potencia electrica en forma automatica y segura. Para el desarrollo del CSG se implanto un lazo de control por temperatura para el sistema de turbina de gas y un lazo de control por presion estrangulada para la turbina de gas y un lazo de control por presion estrangulada para la turbina de vapor. El diseno de estos sistemas supervisorio se realizo con base en los limites criticos de las variables del proceso involucradas: temperatura promedio de empaletado para la turbina de gas (TG) y presion estrangulada para la turbina de vapor (TV)

  12. Prediction for the high-level alpha-active waste to be generated by nuclear power stations in the Member States of the European Communities

    International Nuclear Information System (INIS)

    Schmidt, E.

    1977-04-01

    Starting with a forecast for the nuclear power generating capacity to be installed in the Member States of the European Communities before the end of this century, a prediction is made of the annual production of high-level alpha-active waste from reprocessing plants and the corresponding accumulation up to the year 2000. The isotopic composition of the alpha-active waste from individual reactor types was calculated and an estimation of the influence of recycling plutonium through light water reactors on the produced quantity of higher actinides is made

  13. The solution to avoid protection fuses' failure of the driving motor of the turbine-generator set during its startup in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Chen Jisheng

    2005-01-01

    Based on a detailed analysis of the inter-relationship in the current, voltage, electromagnetic torque and ratio of the difference between the speed of rotor and the speed of rotary magnetic field to the later in the motor, the root cause was point out, which leads to the protection fuses' failure of the motor in the starting stage, which drives the turbine-generator set to rotate at low speed before its startup. Two solutions to avoid the situation are proposed, too. (authors)

  14. Concrete for the construction of No. 1 nuclear power generator of Tokyo Denryoku Co.'s Kashiwazaki, Kariha nuclear power station

    International Nuclear Information System (INIS)

    Suzuki, Yasuyoshi; Eguchi, Kiyoshi; Nakakomi, Akira.

    1985-01-01

    The construction of the No.1 power generator of Kariha nuclear power generator was completed on March 1985, and the installations of equipments are on their way aiming the start in October 1960. About 900,000 m 3 of concrete was produced and used for whole work and about 500,000 m 3 out of total was used for the construction of plant building. For constructing reactor building and turbin building, the concrete must have shielding property against radiation. The specific gravity no less than 2.5 was required for dry state of laid concrete. In order to supply very large amount of concrete with stable quality, preliminary investigation on raw materials including aggregates, fly-ash and surface active agents, were made. Aggregates were stored in underground bins to keep the temperature constant for the purpose of obtaining mixed concrete with constant temperature. For determining the mixing rate of concrete, physical test such as slump test, determination of air content, determinations of strengths and specific gravities of solidified concrete. Quality control committee was established to observe the optimum condition, which were confirmed by preliminary tests, of concrete preparation. As the results of detailed preliminary investigation on respective raw material and strict quality control from the source of raw material to mixed concrete, the supply of concrete with stable quality which conforms every requirement of standard, was possible. (Ishimitsu, A.)

  15. Report of fiscal 1999 basic survey for promoting joint implementation, etc. Combined cycle power generation project for Surgut No.1 power station in the Russian Federation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper explains fiscal 1999 survey on a combined cycle power generation project for Surgut power plant in the Russian Federation for the purpose of making the project tied to the COP3 joint implementation. This power plant consists of 16 units with the total capacity of 3,300 MW. This project is to replace the existing superannuated No.1 through No.6 units with a new high-efficiency gas combined cycle power plant. The project plant is planned to comprise of three units, having the capacity of 417 MW, each consisting of one gas turbine and one steam turbine. The average generation efficiency will be improved tremendously from the present 37.2% to 55.2%. The initial investment will be 615 million in US dollars (at 109.2 yen/dollar). Energy saving will be 634,800 toe/year, with cost to effect 9,452 toe-y/million yen. Greenhouse effect gas reduction will be 1,509,000 t-CO2/year, with cost to effect 22.5 t-CO2-y/million yen. The investment recovery period is estimated to be 24 years. The Russian side strongly wishes to be granted a finance on a favorable terms and conditions to realize this project. It is possible that the Russian government requests Japan for grant of the Yen credit. Accordingly, an early start is necessary in order to deal with such request. (NEDO)

  16. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Dockets Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1987-03-01

    Supplement No. 11 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizone, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 10 was issued and (2) other matters requiring staff review since Supplenent No. 10 was issued, specifically those issues that required resolution before Unit 3 low-power licensing

  17. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 9

    International Nuclear Information System (INIS)

    1985-12-01

    Supplement No. 9 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 8 was issued; and (2) matters that the staff had under review when Supplement No. 8 was issued, specifically those issues which required resolution prior to Unit 2 fuel loading and testing up to 5% of full power

  18. Safety evaluation report related to the operation of Palo Verde nuclear generating station, Units 1, 2, and 3. Docket Nos. STN 50-528, STN 50-529, and STN 50-530, Arizona Public Service Company

    International Nuclear Information System (INIS)

    1982-05-01

    On November 13, 1981, the Nuclear Regulatory Commission (NRC) staff issued its Safety Evaluation Report (SER) relating to the application for licenses to operate the Palo Verde Nuclear Generating Station, Unit Nos. 1, 2 and 3 (PVNGS 1-3); Supplement No. 1 to the SER was issued on February 4, 1982. In the SER and Supplement No. 1, the staff identified certain issues where either further information was required of the applicant or additional staff effort was necessary to complete the review of the application. The purpose of this supplement is to update the SER by providing (1) the evaluation of additional information submitted by the applicant since Supplement No. 1 to the SER was issued, and (2) the evaluation of the matters that the staff had under review and Supplement No. 1 was issued

  19. LINK2009 Phase 1: Development of 2. generation fuel cell vehicles and hydrogen refueling station. Final report; LINK2009 fase 1: Udvikling af 2. gen. braendselscelle koeretoejer og brinttankstation. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    2010-03-15

    LINK2009 project was to develop 2nd gen. technologies fuel cell systems for vehicles and 350bar hydrogen refueling stations. Also the LINK2009 project were to ensure a continuously positioning of Denmark and the Scandinavian Region within hydrogen for transport and continue to attract international car manufacturers to conduct demonstration and later market introduction in the region. The LINK2009 project is divided in two phases where this first phase only deals with the development of the 2nd generation technologies, whereas the following phase 2 will include the demonstration hereof as well as additional research activities. This Report describes the results of the phase 1 that was commenced in summer 2008 and ended in late 2009. Phase 1 has resulted in the development of new 2nd generation fuel cell technology for use in a city car and a service vehicle. Stated targets for price and efficiency have been reached and the following demonstration in Phase 2 is to confirm reaching of life time targets. The efficiency of the fuel cell system for the city car has been measured to be 42-48% at a power delivery of respectively 10kW and 2kW, which is significantly above the target of >40%. System simplifications and selection of new components have enabled a 50% reduction in the kW price for the fuel cell system, including 700bar hydrogen storage, now totalling Euro 4.500/kW. This creates sufficient basis for conducting demonstration of the system in vehicles. 9 vehicles are planned to be demonstrated in the following phase 2. Additional 8 vehicles were put in operation in Copenhagen in November 2009. Phase 1 has conducted development of 2nd gen. hydrogen refuelling technology that has resulted in concepts for both 350bar and 700bar refuelling as well as a concept for onsite hydrogen production at refuelling stations. In separate projects the developed 350bar technology has been brought to use in a newly established hydrogen station in Copenhagen, and the hydrogen

  20. Information system for data management of civil buildings instrumentation in generating power stations; Sistema de informacion para el manejo de datos de la instrumentacion de las obras civiles de las centrales generadoras

    Energy Technology Data Exchange (ETDEWEB)

    Alvarado, Alonso; Escamilla, Juan Carlos; Alaniz, Felipe de Jesus [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Gonzalez, Francisco; Mena, Enrique [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1997-12-31

    A relevant task performed by Comision Federal de Electricidad (CFE) is the analysis of the structural behavior and safety assessment of the country`s large electric energy generating stations. This task is performed capturing, revising an analyzing the information generated by measuring instruments installed in the power station civil structures. Such activity generates a large amount of data and the collection, analysis and assessment is a long and tiresome process; additionally, the generated information is kept in plain isolated files, that causes sluggishness in the process and delays in the access to the information. This article describes the characteristics of the Information System for Structure Measurements (Sistema de Informacion de Medicion de Estructuras) (SIME), developed by the Instituto de Investigaciones Electricas (IIE) for CFE in order to enhance the opportunity for the information management. SIME captures, arranges, stores and reports the data obtained from the measurements at the works with great efficiency and flexibility. This system is part of another of greater scope with which CFE will ensure an optimum operation condition of its civil buildings. [Espanol] Una tarea relevante que realiza la Comision Federal de Electricidad (CFE) es analizar el comportamiento estructural y evaluar la seguridad de las grandes obras generadoras de energia electrica del pais. Esta tarea la realiza capturando, revisando y analizando la informacion que generan instrumentos de medicion instalados en las estructuras civiles de las centrales. Tal actividad genera gran cantidad de datos y el proceso de recopilacion, analisis y evaluacion es tardado y tedioso; ademas, la informacion que se genera se guarda en archivos planos aislados, lo que ocasiona lentitud en el proceso y retraso en el acceso a la informacion. Este articulo describe las caracteristicas del Sistema de Informacion de Medicion de Estructuras (SIME) desarrollado por el Instituto de Investigaciones