WorldWideScience

Sample records for licensing examination impact

  1. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  2. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  3. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  4. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  5. To License or Not to License: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    Directory of Open Access Journals (Sweden)

    Thomas Lonardo

    2008-09-01

    Full Text Available In this paper the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner licensing. The authors conclude that states must differentiate between Private Investigator and Digital Examiner licensing requirements and oversight.

  6. Non-Power Reactor Operator Licensing Examiner Standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, this standard will be revised periodically to accommodate comments and reflect new information or experience

  7. Interdisciplinary environmental impact statement examinations with parallel licensing procedures

    International Nuclear Information System (INIS)

    Gassner, E.

    1990-01-01

    The article investigates the question how the interdisciplinary, collective, integrative environmental impact statement can predominate the decisions in individual licensing procedures. It illustrates the requirements of the Act on Environmental Impact Statements. According to this Act, measures are to be found which deal with the overall complex, i.e. the entire system. In the article, the monitoring project organization's primary responsibility is emphasized: Analysis and prognosis of a project's environmental impacts are transferred to this organization for decision-preparation. Subsequent corrections or supplementations during the official approval procedure, or incorporation of the public through the authorities, do not change the matter. An all-comprehensive assessment must be based on all-comprehensive standards. From the point of view of immissions this is minimization of adverse effects on the nature cycle and landscape matters; from the point of view of emissions it is the duty of environment-compatible waste management within the sense of waste management legislation having to serve public welfare. (orig.) [de

  8. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  9. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

  10. To License or Not to License Revisited: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    OpenAIRE

    Thomas Lonardo; Doug White; Alan Rea

    2009-01-01

    In this update to the previous year's study, the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner lice...

  11. The Impact of Open Licensing on the Early Reader Ecosystem

    Science.gov (United States)

    Butcher, Neil; Hoosen, Sarah; Levey, Lisbeth; Moore, Derek

    2016-01-01

    The Impact of Open Licensing on the Early Reader Ecosystem examines how to use open licensing to promote quality learning resources for young children that are relevant and interesting. Research in early reading tends to focus on traditional publishing value and supply chains, without taking much consideration of new approaches and solutions…

  12. Why operators fail licensing examinations

    International Nuclear Information System (INIS)

    Roth, D.R.; Zerbo, J.N.

    1975-01-01

    A survey was conducted among nuclear utility operators who have taken NRC licensing examinations to determine which factors they considered important in their success or failure. The operators also compared the actual NRC examination with their expectations prior to taking the examination. The results of the survey supplement NRC statistics with regard to failure rates. Over 350 operators and 20 utilities participated in the survey and a good cross section of the nuclear community is represented. Reactor theory and emergency procedures are important areas in which operators found NRC emphasis to be different than expected. Observation Training and Design Lecture Series are two training segments which appear to require improvement. Recommendations are made for the use of data collected through this survey and for continuation of the effort to give operators a mechanism of supplying feedback to the training and licensing process

  13. Generic environmental impact statement for license renewal of nuclear plants. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This GEIS examines the possible environmental impacts that could occur as a result of renewing the licenses of individual nuclear power plants under 10 CFR 54. To the extent possible, it establishes the bounds and significance of these potential impacts. The analysis encompasses all operating light-water reactors. For each type of environmental impact, the GEIS attempts to establish generic findings covering as many plants as possible. While plant and site-specific information is used in developing the generic findings, the NRC does not intend for the GEIS to be a compilation of individual plant environmental impacts statements. This document has three principal objectives: (1) to provide an understanding of the types and severity of environmental impacts that may occur as a result of license renewal, (2) to identify and assess those impacts that are expected to be generic to license renewal, and (3) to support rulemaking (10 CFR 51) to define the number and scope of issues that need to be addressed by the applicants in plant-by-plant license renewal proceedings

  14. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-Materials Licenses § 51.97 Final environmental impact statement—materials license. (a) Independent spent fuel storage installation (ISFSI...

  15. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  16. Operator licensing examination standards for power reactors. Interim revision 8

    International Nuclear Information System (INIS)

    1997-01-01

    These examination standards are intended to assist NRC examiners and facility licensees to better understand the processes associated with initial and requalification examinations. The standards also ensure the equitable and consistent administration of examinations for all applicants. These standards are for guidance purposes and are not a substitute for the operator licensing regulations (i.e., 10 CFR Part 55), and they are subject to revision or other changes in internal operator licensing policy. This interim revision permits facility licensees to prepare their initial operator licensing examinations on a voluntary basis pending an amendment to 10 CFR Part 55 that will require facility participation. The NRC intends to solicit comments on this revision during the rulemaking process and to issue a final Revision 8 in conjunction with the final rule

  17. History of the medical licensing examination (uieop in Korea’s Goryeo Dynasty (918-1392

    Directory of Open Access Journals (Sweden)

    Kyung-Lock Lee

    2015-05-01

    Full Text Available This article aims to describe the training and medical licensing system (uieop for becoming a physician officer (uigwan during Korea’s Goryeo Dynasty (918-1392. In the Goryeo Dynasty, although no license was necessary to provide medical services to the common people, there was a licensing examination to become a physician officer. No other national licensing system for healthcare professionals existed in Korea at that time. The medical licensing examination was administered beginning in 958. Physician officers who passed the medical licensing examination worked in two main healthcare institutions: the Government Hospital (Taeuigam and Pharmacy for the King (Sangyakguk. The promotion and expansion of medical education differed depending on the historical period. Until the reign of King Munjong (1046-1083, medical education as a path to licensure was encouraged in order to increase the number of physician officers qualifying for licensure by examination; thus, the number of applicants sitting for the examination increased. However, in the late Goryeo Dynasty, after the officer class of the local authorities (hyangri showed a tendency to monopolize the examination, the Goryeo government limited the examination applications by this group. The medical licensing examination was divided into two parts: medicine and ‘feeling the pulse and acupuncture’ (jugeumeop. The Goryeo Dynasty followed the Chinese Dang Dynasty’s medical system while also taking a strong interest in the Chinese Song Dynasty’s ideas about medicine.

  18. Generic environmental impact statement for license renewal of nuclear plants

    International Nuclear Information System (INIS)

    1996-05-01

    Volume 2 of the Generic Environmental Impact Statement for License Renewal of Nuclear Plants contains the appendices. These include: (A) General characterisitics and environmental settings of domestic nuclear plants, (B) Definition of impact initiators, (C) Socioeconomics and case studies, (D) Aquatic organisms and human health, (E) Radiation protection considerations, (F) Methodology for assessing impacts to aquatic ecology and water resources, (G) Postulated accidents, and (H) Environmental statutes and regulations affecting license renewal

  19. The development of reactor operator license examination question bank

    International Nuclear Information System (INIS)

    Kim, In Hwan; Woo, S. M.; Kam, S. C.; Nam, K. J.; Lim, H. P.

    2001-12-01

    The number of NPP keeps increasing therefore there is more need of reactor operators. This trend requires the more efficiency in managing the license examination. Question bank system will help us to develop good quality examination materials and keep them in it. The ultimate purpose of the bank system is for selecting qualified reactor operators who are primarily responsible for the safety of reactor operation in NPP

  20. Pedagogy and Culture: An Educational Initiative in Supporting UAE Nursing Graduates Prepare for a High-Stakes Nurse Licensing Examination

    Science.gov (United States)

    Brownie, Sharon M.; Williams, Ged; Barnewall, Kate; Bishaw, Suzanne; Cooper, Jennifer L.; Robb, Walter; Younis, Neima; Kuzemski, Dawn

    2015-01-01

    Graduates of an Abu Dhabi transnational nursing degree struggled with the mandatory national licensing examination. Poor pass rates undermine graduate career futures and impact on the workforce capacity building contributions of the partnering transnational educational providers. This paper describes how the design and delivery of an intensive…

  1. Environmental impact studies of projects be licensed under the Atomic Law

    International Nuclear Information System (INIS)

    Heuel-Fabianek, Burkhard; Lennartz, Reinhard

    2009-01-01

    The German Law on Environmental Impact Assessment (UVPG) defines projects to be licensed under the Atomic Law that require an environmental impact study (EIS). Since the project concepts as defined in the UVPG are often not the same as those defined in the Atomic Law (AtG), the licensing authority has to decide which project should be subjected to an EIA. Additionally, Article 37 of the EURATOM Treaty obliges every Member State to communicate certain data relating to the impact of emissions of radioactive substances to the Commission. This is independent of the EIA. A licence may only be granted by the competent authorities if an opinion has been received from the Commission pursuant to Article 37. In either case, the licensing authority is the first point of contact for the applicant if the question arises of whether a project has to be subjected to an EIA. A ''voluntary'' EIA should be regarded with caution because of the complexity of such a procedure within the licensing process requiring considerable resources of time and manpower, and the danger of a loss of credibility of the EIA. (orig.)

  2. 75 FR 52456 - Customs Broker License Examination Individual Eligibility Requirements

    Science.gov (United States)

    2010-08-26

    ... DEPARTMENT OF HOMELAND SECURITY U.S. Customs and Border Protection 19 CFR Part 111 [USCBP-2008-0059; CBP Dec. 10-28] RIN 1651-AA74 Customs Broker License Examination Individual Eligibility Requirements AGENCY: Customs and Border Protection, Department of Homeland Security. ACTION: Final rule...

  3. Impact on future licensing

    International Nuclear Information System (INIS)

    Pasedag, W.F.; Postma, A.K.

    1986-01-01

    The TMI-2 accident has had a dramatic impact on the assessment of severe accidents, particularly on accident source term assumptions. TMI not only demonstrated that regulatory interest in severe accidents is appropriate, but also illustrated our limited understanding of fission product behaviour under degraded core conditions. The resulting reassessment of accident source terms has resulted in a concerted, world-wide research effort, which has produced a new source term estimation methodology. In order to assess the potential impact of the application of this methodology on regulatory requirements, a comparison with the approach used in licensing analyses is necessary. Such a comparison performed for the TMI-2 accident sequence, shows that differences in assumptions concerning accident progression far outweigh the differences in the methodology per se. In particular, the degree of conservatism incorporated into assumptions concerning operator action and containment response has over-riding influence on source term estimates. A major contribution to the impact of the new source term methodology on regulatory requirements, therefore, is its capability to provide the improved level of understanding necessary for reassessment of regulatory assumptions in this area

  4. Step-2 Thai Medical Licensing Examination result: a follow-up study.

    Science.gov (United States)

    Wanvarie, Samkaew; Prakunhungsit, Supavadee

    2008-12-01

    The Thai medical students sat for the Medical Licensing Examination of Thailand (MLET) Step 2 for the first time in 2008. This paper analysed the first batch of Ramathibodi students taking the MLET Steps 1 and 2 in 2006 and 2008 respectively. The scores from the MLET Steps1 and 2, and fifth-year cumulative grade point averages (GPAX) of 108 students were analysed. Only 6 (5.6%) students failed the MLET Step 2 examination. Students who failed the MLET Step1 were more likely to fail their MLET Step 2 (relative risk, 5.8; 95% confidence interval, 1.3-26.0). Students with low GPAX or scoring in the lowest quintile or tertile on the MLET Step1 were also at increased risk of failing the LET Step 2. The data suggest that performance on the MLET Step 1 and GPAX are important predictors of a student's chances of passing the MLET Step 2. Students with poor academic achievement or failing the MLET Step1 should be given intensive tutorials to pass the medical licensing examination.

  5. MARSSIM guidelines for non-impacted area identification in support of partial site release prior to license termination

    International Nuclear Information System (INIS)

    Parish, D.

    1999-01-01

    Regulations are in place which allow plants undergoing decommissioning to remove obsolete requirements from their licenses. Large buffer areas to the site boundary, needed for emergency planning purposes during power operation, are not required for permanently defueled facilities. It is important that non-impacted areas be removed from license restrictions as soon as possible post shutdown to allow rapid asset recovery and return the large environmental resources these areas represent to beneficial use. License termination surveys are not required for non-impacted areas in accordance with the guidance of US Nuclear Regulatory Commission (NRC) NUREG-1575 (MARSSIM), and NRC Draft Regulatory Guide DG-4006. Thus, such areas do not fall under the license termination requirements of 10CFR50.82 (US Code of Federal Regulations). This report describes methods of classifying areas as non-impacted in accordance with MARRSIM and other NRC guidance, and the licensing options for release of non-impacted areas prior to license termination. The status of Big Rock Point's efforts toward early release of non-impacted areas also is provided. (author)

  6. Current safety issues of CANDU licensing

    International Nuclear Information System (INIS)

    Lee, Y.; Natalizio, A.

    1994-01-01

    As requested by Korea Institute of Nuclear Safety(KINS), the status of five generic licensing issues has been examined and their potential impact on a new plant that would be constructed in Canada has been evaluated. The results and conclusions of this evaluation are summarized as follows: steam explosion in calandria, hydrogen explosion in containment, use of PSA in reactor licensing, human factors, safety critical software

  7. Renewing the licenses of US nuclear plants: An assessment of the socioeconomic impacts

    International Nuclear Information System (INIS)

    Schweitzer, M.; Saulsbury, J.W.; Schexnayder, S.M.

    1993-01-01

    In recent years, increased national attention has been focused on the potential effects of renewing, or not renewing, the licenses of nuclear power plants as the oldest of them approach the end of the 40-year operating period allowed by their original licenses. As part of a larger study for the US Nuclear Regulatory commission (NRC), the authors conducted an assessment of the potential socioeconomic impacts to those communities throughout the country in which nuclear power plants are located and which, therefore, are most directly affected by renewal of nuclear power plant licenses. This paper focuses on six key issues that are traditionally considered essential in the assessment of social impacts: Population; housing; tax payments; local public services; land use and development; and economic structure

  8. 75 FR 5620 - New Date for April 2010 Customs Brokers License Examination

    Science.gov (United States)

    2010-02-03

    ... types of infractions. In the case of an applicant for an individual broker's license, section 641... regularly scheduled examination date conflicts with a national holiday, religious observance, or other... (April 5) coincides with the observance of Passover. In consideration of this conflict with Passover, CBP...

  9. Simulator training and licensing examination for nuclear power station operator

    International Nuclear Information System (INIS)

    Xu Pingsheng

    2007-01-01

    For the recruitment, training and position qualification of the simulator instructors and feedback of training effect, the management approaches are formulated in 'The System for Simulator Training and Licensing Examination of Daya Bay Nuclear Power Station Operators'. The concrete requirements on the professional knowledge, work experience and foreign language ability of a simulator instructor are put forward. The process of instructor training is designed. The training items include the trainer training, pedagogy training, time management training, operation activities training during outage of unit, 'shadow' training and on-the-jot training on simulator courses. Job rotation is realized between simulator instructor and licensing personnel on site. New simulator instructor must pass the qualification identification. After a duration of 2 years, re-qualification has to be carried out. On the basis of the operator training method introduced from EDF (electricite De France), some new courses are developed and the improvement on the initial training, retaining courses, the technical support and the experience feedback by using the simulator is done also. (authors)

  10. Public participation in the licensing of large-scale projects with environmental impact

    International Nuclear Information System (INIS)

    1989-01-01

    As a rule, public participation in licensing and planning procedures for large-scale projects with environmental impact is as controversial as the projects themselves. Against this background, an interdisciplinary examination of several 'cases' of public participation in administrative procedures with varying legal forms is being conducted in a joint research project run by the Department for Applied Systems Analysis (Karlsruher Nuclear Centre) and the Research Institute for Public Administration at the College for Administrative Sciences in Speyer. The actual course of events and the practical experience of the groups involved (authorities, applicants, objectors, experts) are related to the applicable legal arrangements for public participation. The question to be answered is: which expected and unexpected functions do the procedures actually fulfill and which not. Proposals for the amendment of legal policy could be developed upon the foundation of such a diagnosis. The report contains the results of the 'pilot study' on public participation in the licensing of the nuclear power plant GKN-2 in Neckarwestheim and further contributions on the issue of 'public participation', presented within the framework of a research colloquium at the School for Nuclear Technology/Karlsruhe Nuclear Research Centre. (orig.) [de

  11. Environmental licensing issues for cogeneration plants

    International Nuclear Information System (INIS)

    Lipka, G.S.; Bibbo, R.V.

    1990-01-01

    The siting and licensing of cogeneration and independent power production (IPP) facilities is a complex process involving a number of interrelated engineering, economic, and environmental impact considerations. Important considerations for the siting and licensing of such facilities include air quality control and air quality impacts, water supply and wastewater disposal, and applicable noise criteria and noise impact considerations. Air quality control and air quality impact considerations for power generation facilities are commonly reviewed in the public forum, and most project developers are generally aware of the key air quality licensing issues. These issues include Best Available Control Technology (BACT) demonstration requirements, and air quality modeling requirements. BACT is a case-by-case determination, which causes uncertainty, in that developers have difficulty in projecting the cost of required control systems. Continuing developments in control technology may cause this problem to continue in the 1990's. Air quality modeling can be a problem in hilly terrain or within or near an urban environment, which could delay or preclude permitting of a new cogeneration or IPP facility in such locations. This paper discusses several environmental issues which are less frequently addressed than air quality issues, namely water/wastewater and noise. The design features of typical cogeneration and IPP facilities that affect water supply requirements, wastewater volumes, and noise emissions are discussed. Then, the site selection and impact review process are examined to identify typical constraints and trade-offs that can develop relative to water, wastewater, and noise issues. Trends in permit review requirements for water, wastewater, and noise are examined. Finally, innovative approaches that can be used to resolve potential development constraints for water, wastewater, and noise issues are discussed

  12. Individual Licensing Models and Consumer Protection

    NARCIS (Netherlands)

    Guibault, L.; Liu, K.-C.; Hilty, R.M.

    2017-01-01

    Copyright law is not primarily directed at consumers. Their interests are therefore only marginally accounted for, as the copyright rules exempt specific uses of works from the right holder’s control. This chapter examines the impact of digital technology on the position of consumers of licensed

  13. Construct Validity of the Korean Dental Licensing Examination using Confirmatory Factor Analysis

    Directory of Open Access Journals (Sweden)

    Mi Kyoung Yim

    2005-06-01

    Full Text Available Confirmatory factor analysis based on a measurement model of a structural equation model was used to test the construct validity of 13 subjects in the Korean Dental Licensing Examination (KDLE. The results of 1,086 examinees who wrote the KDLE in 2004 were analyzed. The thirteen subjects were classified into 62 major categories and 122 intermediate categories. There were 364 items. A hierarchical model was constructed, including major and intermediate categories. The impact of the variables was determined by the standardized regression coefficient that related latent and measured variables in the measurement model. The KDLE showed a high goodness-of-fit with a root mean square error of approximation of 0.030 and a non-normed fit index of 0.998. When the latent variables for the major and intermediate categories were analyzed, the standardized regression coefficients of all of the subjects, with the exception of Health and Medical Legislation, were significant. From the result, we concluded that the 13 subjects showed constructive validity. In addition, the study model and data were very compatible. The subject Health and Medical Legislation had a low explanatory impact with respect to testing the ability of dentists to perform their jobs. This study suggests that similar psychometric studies are needed before integrating or deleting subjects on the KDLE, and to improve item development.

  14. Medical licensing examination (uigwa and the world of the physician officers (uigwan in Korea’s Joseon Dynasty

    Directory of Open Access Journals (Sweden)

    Nam Hee Lee

    2015-05-01

    Full Text Available Physicians for ordinary people in Korea’s Joseon Dynasty (1392-1910 did not need to pass the national medical licensing examination. They were able to work after a sufficient apprenticeship period. Only physician officers were licensed as technical civil servants. These physician officers were middle class, located socially between the nobility and the commoner. They had to pass a national licensing examination to be considered for high-ranking physician officer positions, that is, those at the rank equal to or above the 6th level out of a total of 9 ranks, where the first rank was highest. Royal physicians also had to pass this examination before accepting responsibility for the King’s healthcare. This article aims to describe the world of physician officers during the Joseon Dynasty. Physician officers enjoyed considerable social status because they dealt with matters of life and death. Owing to the professional nature of their fields and a strong sense of group identity, they came to compose a distinct social class. The physician officers’ world was marked by strong group allegiances based on shared professional knowledge; the use of marriage to gain and maintain social status; and the establishment of hereditary technical posts within the medical profession that were handed down from one generation to the next. The medical licensing examination persisted until 1894 when the civil service examination agency, of which it was part, was abolished. Until that time, the testing agency, the number of candidates who were accepted, two-step test procedures, and the method of test item selection were maintained and enforced.

  15. Overview and current management of computerized adaptive testing in licensing/certification examinations

    Directory of Open Access Journals (Sweden)

    Dong Gi Seo

    2017-07-01

    Full Text Available Computerized adaptive testing (CAT has been implemented in high-stakes examinations such as the National Council Licensure Examination-Registered Nurses in the United States since 1994. Subsequently, the National Registry of Emergency Medical Technicians in the United States adopted CAT for certifying emergency medical technicians in 2007. This was done with the goal of introducing the implementation of CAT for medical health licensing examinations. Most implementations of CAT are based on item response theory, which hypothesizes that both the examinee and items have their own characteristics that do not change. There are 5 steps for implementing CAT: first, determining whether the CAT approach is feasible for a given testing program; second, establishing an item bank; third, pretesting, calibrating, and linking item parameters via statistical analysis; fourth, determining the specification for the final CAT related to the 5 components of the CAT algorithm; and finally, deploying the final CAT after specifying all the necessary components. The 5 components of the CAT algorithm are as follows: item bank, starting item, item selection rule, scoring procedure, and termination criterion. CAT management includes content balancing, item analysis, item scoring, standard setting, practice analysis, and item bank updates. Remaining issues include the cost of constructing CAT platforms and deploying the computer technology required to build an item bank. In conclusion, in order to ensure more accurate estimations of examinees’ ability, CAT may be a good option for national licensing examinations. Measurement theory can support its implementation for high-stakes examinations.

  16. Socio-economic impacts of nuclear generating stations: summary report on the NRC post-licensing studies

    International Nuclear Information System (INIS)

    Chalmers, J.; Pijawka, D.; Branch, K.; Bergmann, P.; Flynn, J.; Flynn, C.

    1982-07-01

    Information is presented concerning the conceptual framework for the assessment of socioeconomic impacts; methodology for the post-licensing case studies; socioeconomic changes due to the construction and operation of nuclear generating stations; public response to the construction and operation of nuclear generating stations; socioeconomic consequences of the accident at Three Mile Island; the significance of socioeconomic change due to the construction and operation of nuclear generating stations; findings of the post-licensing studies relative to the nuclear station impact literature; and implications of the findings for projective assessments and planning studies

  17. Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

    International Nuclear Information System (INIS)

    Hanna, Philippe; Vanclay, Frank; Langdon, Esther Jean; Arts, Jos

    2014-01-01

    The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorly implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be

  18. Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

    Energy Technology Data Exchange (ETDEWEB)

    Hanna, Philippe [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands); Langdon, Esther Jean [Department of Anthropology, Center for Philosophy and Human Sciences, Federal University of Santa Catarina PO Box 5104, 88040-970, Florianópolis, SC (Brazil); Arts, Jos [Department of Planning, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands)

    2014-04-01

    The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorly implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be

  19. The role of ground-water travel time in suitability and licensing

    International Nuclear Information System (INIS)

    Murphy, M.R.

    1995-01-01

    This paper examines the Department of Energy (DOE) guidelines and Nuclear Regulatory Commission (NRC) licensing criteria pertaining to groundwater travel time, and their impact on obtaining a license for Yucca Mountain. DOE will be able to obtain a license for Yucca Mountain even if it is determined that there are some fast pathways along which groundwater travel time to the accessible environment is less than 1000 years. However, this will require DOE to gather and analyze a significant amount of firm data, rather than relying primarily on conservative assumptions and bounding calculations

  20. Usefulness of the DETECT program for assessing the internal structure of dimensionality in simulated data and results of the Korean nursing licensing examination

    Directory of Open Access Journals (Sweden)

    Dong Gi Seo

    2017-12-01

    Full Text Available Purpose The dimensionality of examinations provides empirical evidence of the internal test structure underlying the responses to a set of items. In turn, the internal structure is an important piece of evidence of the validity of an examination. Thus, the aim of this study was to investigate the performance of the DETECT program and to use it to examine the internal structure of the Korean nursing licensing examination. Methods Non-parametric methods of dimensional testing, such as the DETECT program, have been proposed as ways of overcoming the limitations of traditional parametric methods. A non-parametric method (the DETECT program was investigated using simulation data under several conditions and applied to the Korean nursing licensing examination. Results The DETECT program performed well in terms of determining the number of underlying dimensions under several different conditions in the simulated data. Further, the DETECT program correctly revealed the internal structure of the Korean nursing licensing examination, meaning that it detected the proper number of dimensions and appropriately clustered the items within each dimension. Conclusion The DETECT program performed well in detecting the number of dimensions and in assigning items for each dimension. This result implies that the DETECT method can be useful for examining the internal structure of assessments, such as licensing examinations, that possess relatively many domains and content areas.

  1. Logistic regression analysis to predict Medical Licensing Examination of Thailand (MLET) Step1 success or failure.

    Science.gov (United States)

    Wanvarie, Samkaew; Sathapatayavongs, Boonmee

    2007-09-01

    The aim of this paper was to assess factors that predict students' performance in the Medical Licensing Examination of Thailand (MLET) Step1 examination. The hypothesis was that demographic factors and academic records would predict the students' performance in the Step1 Licensing Examination. A logistic regression analysis of demographic factors (age, sex and residence) and academic records [high school grade point average (GPA), National University Entrance Examination Score and GPAs of the pre-clinical years] with the MLET Step1 outcome was accomplished using the data of 117 third-year Ramathibodi medical students. Twenty-three (19.7%) students failed the MLET Step1 examination. Stepwise logistic regression analysis showed that the significant predictors of MLET Step1 success/failure were residence background and GPAs of the second and third preclinical years. For students whose sophomore and third-year GPAs increased by an average of 1 point, the odds of passing the MLET Step1 examination increased by a factor of 16.3 and 12.8 respectively. The minimum GPAs for students from urban and rural backgrounds to pass the examination were estimated from the equation (2.35 vs 2.65 from 4.00 scale). Students from rural backgrounds and/or low-grade point averages in their second and third preclinical years of medical school are at risk of failing the MLET Step1 examination. They should be given intensive tutorials during the second and third pre-clinical years.

  2. Correlation of United States Medical Licensing Examination and Internal Medicine In-Training Examination performance.

    Science.gov (United States)

    Perez, Jose A; Greer, Sharon

    2009-12-01

    The Internal Medicine In-Training Examination (ITE) is administered during residency training in the United States as a self-assessment and program assessment tool. Performance on this exam correlates with outcome on the American Board of Internal Medicine Certifying examination. Internal Medicine Program Directors use the United States Medical Licensing Examination (USMLE) to make decisions in recruitment of potential applicants. This study was done to determine a correlation of USMLE Steps 1, 2 and 3 results with ITE scores in each level of Internal Medicine training. A retrospective review of all residents graduating from an Internal Medicine program from 1999 to 2006 was done. Subjects included had data for all USMLE Steps and ITE during all years of training. Thirty-one subjects were included in the study. Correlations of USMLE Steps 1, 2 and 3 were done with ITE scores (percent correct) in each year of training. Pearson's correlation coefficient (r) was determined for each pairing and a t test to determine statistical significance of the correlation was done. Statistical significance was defined as P value ITE percent correct in PGY I, II and III were 0.46, 0.55 and 0.51 respectively. Corresponding r values for USMLE Step 2 and ITE percent correct were 0.79, 0.70 and 0.72; for USMLE Step 3 these values were 0.51, 0.37 and 0.51 respectively for each training year. USMLE scores are correlated with ITE scores. This correlation was strongest for USMLE Step 2.

  3. Perception survey on the introduction of clinical performance examination as part of the national nursing licensing examination in Korea

    Directory of Open Access Journals (Sweden)

    Su Jin Shin

    2017-10-01

    Full Text Available Purpose The purpose of this study was to analyze opinions about the action plan for implementation of clinical performance exam as part of the national nursing licensing examination and presents the expected effects of the performance exam and aspects to consider regarding its implementation. Methods This study used a mixed-methods design. Quantitative data were collected by a questionnaire survey, while qualitative data were collected by focus group interviews with experts. The survey targeted 200 nursing professors and clinical nurses with more than 5 years of work experience, and the focus group interviews were conducted with 28 of professors, clinical instructors, and nurses at hospitals. Results First, nursing professors and clinical specialists agreed that the current written tests have limitations in evaluating examinees’ ability, and that the introduction of a clinical performance exam will yield positive results. Clinical performance exam is necessary to evaluate and improve nurses’ work ability, which means that the implementation of a performance exam is advisable if its credibility and validity can be verified. Second, most respondents chose direct performance exams using simulators or standardized patients as the most suitable format of the test. Conclusion In conclusion, the current national nursing licensing exam is somewhat limited in its ability to identify competent nurses. Thus, the time has come for us to seriously consider the introduction of a performance exam. The prerequisites for successfully implementing clinical performance exam as part of the national nursing licensing exam are a professional training process and forming a consortium to standardize practical training.

  4. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  5. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  6. Impact of New Radiation Safety Standards on Licensing Requirements of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Strohal, P.; Subasic, D.; Valcic, I.

    1996-01-01

    As the outcomes of the newly introduced safety philosophies, new and more strict safety design requirements for nuclear installation are expected to be introduced. New in-depth defence measures should be incorporated into the design and operation procedure for a nuclear installation, to compensate for potential failures in protection or safety measures. The new requirements will also apply to licensing of NPP's operation as well as to licensing of nuclear sites, especially for radioactive waste disposal sites. This paper intends to give an overview of possible impacts of new internationally agreed basic safety standards with respect to NPP and related technologies. Recently issued new basic safety standards for radiation protection are introducing some new safety principles which may have essential impact on future licensing requirements regarding nuclear power plants and radioactive waste installations. These new standards recognize exposures under normal conditions ('practices') and intervention conditions. The term interventions describes the human activities that seek to reduce the existing radiation exposure or existing likelihood of incurring exposure which is not part of a controlled practice. The other new development in safety standards is the introduction of so called potential exposure based on the experience gained from a number of radiation accidents. This exposure is not expected to be delivered with certainty but it may result from an accident at a source or owing to an event or sequence of events of a probabilistic nature, including equipment failures and operating errors. (author)

  7. Licensing and accident reviews for an HNEC

    International Nuclear Information System (INIS)

    Clark, R.G.

    1978-09-01

    The purpose of this review was to identify siting or other concerns that may indicate limitations on the ability to license a nuclear energy center at Hanford. Several studies on nuclear energy centers have been completed and some have included licensing (regulatory) aspects of siting nuclear power centers. This review however, was primarily to identify any limitations that may affect licensing specifically at an HNEC. The scope included examining existing criteria for siting nuclear facilities, including single reactor and multireactor (multi-unit) sites. To fill a void in other analyses and to gain some perspective on another impact of an HNEC, the scope was extended to analyze the consequences within the HNEC, of a class nine accident at a unit at one site. A predictive model utilized in this analysis was developed from meteorological parameters based on thirty years of meteorological records at Hanford. From this analysis, additional perspective was developed on the relative severity of the effects of rare events, both man made and from unstable conditions in nature, on the operation of (and the ability to license) an energy center at Hanford

  8. The Validity of Subjects in Korean Dental Technicians' Licensing Examination

    Directory of Open Access Journals (Sweden)

    Woong-chul Kim

    2005-06-01

    Full Text Available This study prepared a basic framework for the development and improvement of Korean Dental Technicians' Licensing Examination, based on actual test questions. A peer review was conducted to ensure relevance to current practices in dental technology. For the statistical analysis, 1000 dental laboratory technicians were selected; specialists in dental laboratory technology (laboratory owners, educators, etc. were involved in creating valid and reliable questions. Results indicated that examination subjects should be divided into three categories: basic dental laboratory theory, dental laboratory specialties, and a practical examination. To ensure relevance to current practice, there should be less emphasis on basic dental laboratory theory, including health-related laws, and more emphasis on dental laboratory specialties. Introduction to dental anatomy should be separated from oral anatomy and tooth morphology; and fixed prosthodontics should be separated from crown and bridge technology and dental ceramics technology. Removable orthodontic appliance technology should be renamed 'orthodontic laboratory technology'. There should be less questions related to health related law, oral anatomy, dental hygiene, dental materials science and inlay, while the distribution ratio of questions related to tooth morphology should be maintained. There should be a decrease in the distribution ratio of questions related to crown and bridge technology, dental ceramics technology, complete dentures and removable partial dentures technology, and orthodontic laboratory technology. In the practical examination, the current multiple choice test should be replaced with tooth carving using wax or plaster. In dental laboratory specialties, subjects related to contemporary dental laboratory technology should be included in the test items.

  9. An examination of the perceived teaching competencies of novice alternatively licensed and traditionally licensed high school science teachers

    Science.gov (United States)

    Shea, Kathleen A.

    In most states, there are two routes to teacher licensure; traditional and alternative. The alternative route provides an accelerated entry into the classroom, often without the individual engaging in education coursework or a practicum. No matter the route, teaching skills continue to be learned by novice teachers while in the classroom with the guidance of a school-based mentor. In this study, the perceptions of mentor teachers of traditionally and alternatively licensed high school science teachers were compared with respect to mentees' science teaching competency. Further, the study explored the novice teachers' self-perception of their teaching competency. A survey, consisting of 56 Likert-type questions, was completed by mentors (N = 79) and novice high school science teachers (N = 83) in six northeastern states. The results revealed a statistically significant difference in the perceptions of the mentors of traditionally and alternatively licensed novice high school science teachers in the areas of general pedagogical knowledge, pedagogical content knowledge and professional growth, with more favorable perceptions recorded by mentors of traditionally licensed science teachers. There were no differences in the perceptions of the mentors with respect to novice high school teachers' content knowledge. There was no statistical difference in the self-perceptions of competency of the novice teachers. While alternative routes to licensure in science may be a necessity, the results of this study indicate that the lack of professional preparation may need to be addressed at the school level through the agency of the mentor. This study indicates that mentors must be prepared to provide alternatively licensed novice teachers with different assistance to that given to traditionally licensed novice teachers. School districts are urged to develop mentoring programs designed to develop the teaching competency of all novice teachers regardless of the route that led them

  10. Teacher License Reciprocity. 50-State Review

    Science.gov (United States)

    Aragon, Stephanie

    2017-01-01

    This policy report defines and provides a 50-state review of teacher license reciprocity, explores how state-specific licensing requirements impact the teacher labor market, and includes examples of national and state efforts to facilitate reciprocity.

  11. Associations between United States Medical Licensing Examination (USMLE) and Internal Medicine In-Training Examination (IM-ITE) scores.

    Science.gov (United States)

    McDonald, Furman S; Zeger, Scott L; Kolars, Joseph C

    2008-07-01

    Little is known about the associations of previous standardized examination scores with scores on subsequent standardized examinations used to assess medical knowledge in internal medicine residencies. To examine associations of previous standardized test scores on subsequent standardized test scores. Retrospective cohort study. One hundred ninety-five internal medicine residents. Bivariate associations of United States Medical Licensing Examination (USMLE) Steps and Internal Medicine In-Training Examination (IM-ITE) scores were determined. Random effects analysis adjusting for repeated administrations of the IM-ITE and other variables known or hypothesized to affect IM-ITE score allowed for discrimination of associations of individual USMLE Step scores on IM-ITE scores. In bivariate associations, USMLE scores explained 17% to 27% of the variance in IME-ITE scores, and previous IM-ITE scores explained 66% of the variance in subsequent IM-ITE scores. Regression coefficients (95% CI) for adjusted associations of each USMLE Step with IM-ITE scores were USMLE-1 0.19 (0.12, 0.27), USMLE-2 0.23 (0.17, 0.30), and USMLE-3 0.19 (0.09, 0.29). No single USMLE Step is more strongly associated with IM-ITE scores than the others. Because previous IM-ITE scores are strongly associated with subsequent IM-ITE scores, appropriate modeling, such as random effects methods, should be used to account for previous IM-ITE administrations in studies for which IM-ITE score is an outcome.

  12. Will nuclear power plant standardization reduce the licensing impact on construction

    International Nuclear Information System (INIS)

    Allen, J.M.; Bingham, W.G.; Keith, D.G.

    1976-01-01

    The NRC and the nuclear industry have been pursuing standardization quite vigorously in an effort to reduce the cost and schedule for the design and construction of nuclear power plants. The NRC is currently reviewing standard plant applications submitted under each of four standardization options. In addition, the NRC has published Standard Review Plans and Standard Technical Specifications. Although problems exist in the implementation of standardization and in areas unaffected by standardization, each of these standardization methods has the potential to reduce the licensing impact on construction

  13. [Impact of Increased Supply of Newly Licensed Nurses on Hospital Nurse Staffing and Policy Implications].

    Science.gov (United States)

    Kim, Yunmi; You, Sunju; Kim, Jinhyun

    2017-12-01

    This study aimed to analyze the impact of increasing the supply of newly licensed nurses on improving the hospital nurse staffing grades for the period of 2009~2014. Using public administrative data, we analyzed the effect of newly licensed nurses on staffing in 1,594 hospitals using Generalized Estimating Equation (GEE) ordered logistic regression, and of supply variation on improving staffing grades in 1,042 hospitals using GEE logistic regression. An increase of one newly licensed nurse per 100 beds in general units had significantly lower odds of improving staffing grades (grades 6~0 vs. 7) (odds ratio=0.95, p=.005). The supply of newly licensed nurses increased by 32% from 2009 to 2014, and proportion of hospitals whose staffing grade had improved, not changed, and worsened was 19.1%, 70.1%, and 10.8% respectively. Compared to 2009, the supply variation of newly licensed nurses in 2014 was not significantly related to the increased odds of improving staffing grades in the region (OR=1.02, p=.870). To achieve a balance in the regional supply and demand for hospital nurses, compliance with nurse staffing legislation and revisions in the nursing fee differentiation policy are needed. Rather than relying on increasing nurse supply, retention policies for new graduate nurses are required to build and sustain competent nurse workforce in the future. © 2017 Korean Society of Nursing Science

  14. 78 FR 37325 - License Renewal of Nuclear Power Plants; Generic Environmental Impact Statement and Standard...

    Science.gov (United States)

    2013-06-20

    ... Nuclear Power Plants; Generic Environmental Impact Statement and Standard Review Plans for Environmental... for Nuclear Power Plants, Supplement 1: Operating License Renewal'' (ESRP). The ESRP serves as a guide... published a final rule, ``Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating...

  15. Examining the economic impacts of hydropower dams on property values using GIS.

    Science.gov (United States)

    Bohlen, Curtis; Lewis, Lynne Y

    2009-07-01

    While the era of dam building is largely over in the United States, globally dams are still being proposed and constructed. The articles in this special issue consider many aspects and impacts of dams around the world. This paper examines dam removal and the measurement of the impacts of dams on local community property values. Valuable lessons may be found. In the United States, hundreds of small hydropower dams will come up for relicensing in the coming decade. Whether or not the licenses are renewed and what happens to the dams if the licenses expires is a subject of great debate. Dams are beginning to be removed for river restoration and fisheries restoration and these "end-of-life" decisions may offer lessons for countries proposing or currently building small (and large) hydropower dams. What can these restoration stories tell us? In this paper, we examine the effects of dams along the Penobscot River in Maine (USA) on residential property values. We compare the results to findings from a similar (but ex post dam removal) data set for properties along the Kennebec river in Maine, where the Edwards Dam was removed in 1999. The Penobscot River Restoration Project, an ambitious basin-wide restoration effort, includes plans to remove two dams and decommission a third along the Penobscot River. Dam removal has significant effects on the local environment, and it is reasonable to anticipate that environmental changes will themselves be reflected in changes in property values. Here we examine historical real estate transaction data to examine whether landowners pay a premium or penalty to live near the Penobscot River or near a hydropower generating dam. We find that waterfront landowners on the Penobscot or other water bodies in our study area pay approximately a 16% premium for the privilege of living on the water. Nevertheless, landowners pay LESS to live near the Penobscot River than they do to live further away, contrary to the expectation that bodies of water

  16. Licensing procedures for Low-Level Waste disposal facilities

    International Nuclear Information System (INIS)

    Roop, R.D.; Van Dyke, J.W.

    1985-09-01

    This report describes the procedures applicable to siting and licensing of disposal facilities for low-level radioactive wastes. Primary emphasis is placed on those procedures which are required by regulations, but to the extent possible, non-mandatory activities which will facilitate siting and licensing are also considered. The report provides an overview of how the procedural and technical requirements for a low-level waste (LLW) disposal facility (as defined by the Nuclear Regulatory Commission's Rules 10 CFR Parts 2, 51, and 61) may be integrated with activities to reduce and resolve conflict generated by the proposed siting of a facility. General procedures are described for site screening and selection, site characterization, site evaluation, and preparation of the license application; specific procedures for several individual states are discussed. The report also examines the steps involved in the formal licensing process, including docketing and initial processing, preparation of an environmental impact statement, technical review, hearings, and decisions. It is concluded that development of effective communication between parties in conflict and the utilization of techniques to manage and resolve conflicts represent perhaps the most significant challenge for the people involved in LLW disposal in the next decade. 18 refs., 6 figs

  17. Is there an agreement among the items of the Korean physical therapist licensing examination, learning objectives of class subjects, and physical therapists' job descriptions?

    Science.gov (United States)

    Kang, Min-Hyeok; Kwon, Oh-Yun; Kim, Yong-Wook; Kim, Ji-Won; Kim, Tae-Ho; Oh, Tae-Young; Weon, Jong-Hyuk; Lee, Tae-Sik; Oh, Jae-Seop

    2016-01-01

    To determine the agreement among the items of the Korean physical therapist licensing examination, learning objectives of class subjects, and physical therapists' job descriptions. The main tasks of physical therapists were classified, and university courses related to the main tasks were also classified. Frequency analysis was used to determine the proportions of credits for the classified courses out of the total credits of major subjects, exam items related to the classified courses out of the total number of exam items, and universities that offer courses related to the Korean physical therapist licensing examination among the surveyed universities. The proportions of credits for clinical decision making and physical therapy diagnosis-related courses out of the total number credits for major subjects at universities were relatively low (2.06% and 2.58%, respectively). Although the main tasks of physical therapists are related to diagnosis and evaluation, the proportion of physiotherapy intervention-related items (35%) was higher than that of examination and evaluation-related items (25%) on the Korean physical therapist licensing examination. The percentages of universities that offer physical therapy diagnosis and clinical decision making-related courses were 58.62% and 68.97%, respectively. Both the proportion of physiotherapy diagnosis and evaluation-related items on the Korean physical therapist licensing examination, and the number of subjects related to clinical decision making and physical therapy diagnosis in the physical therapy curriculum, should be increased to ensure that the examination items and physical therapy curriculum reflect the practical tasks of physical therapists.

  18. Compulsory licensing in Canada and Thailand: comparing regimes to ensure legitimate use of the WTO rules.

    Science.gov (United States)

    Lybecker, Kristina M; Fowler, Elisabeth

    2009-01-01

    This paper examines two recent examples of compulsory licensing legislation: one globally embraced regime and one internationally controversial regime operating under the same WTO rules. In particular, we consider Canadian legislation and the use of compulsory licensing for HIV/AIDS drugs destined for a developing country. This is then contrasted with the conditions under which Thai authorities are pursuing compulsory licenses, the outcomes of their compulsory licenses, as well as the likely impact of the Thai policy. Finally, we construct a rubric to evaluate characteristics of a successful regime. This is used to analyze the Canadian and Thai regimes and frame the expected implications of each national policy. It is hoped that the assessment will guide changes to compulsory licensing design to ensure that legitimate regimes are embraced while illegitimate ones are disallowed.

  19. 78 FR 5840 - Notice of License Termination for University of Illinois Advanced TRIGA Reactor, License No. R-115

    Science.gov (United States)

    2013-01-28

    ... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...

  20. Licensing procedures for Low-Level Waste disposal facilities

    Energy Technology Data Exchange (ETDEWEB)

    Roop, R.D.; Van Dyke, J.W.

    1985-09-01

    This report describes the procedures applicable to siting and licensing of disposal facilities for low-level radioactive wastes. Primary emphasis is placed on those procedures which are required by regulations, but to the extent possible, non-mandatory activities which will facilitate siting and licensing are also considered. The report provides an overview of how the procedural and technical requirements for a low-level waste (LLW) disposal facility (as defined by the Nuclear Regulatory Commission's Rules 10 CFR Parts 2, 51, and 61) may be integrated with activities to reduce and resolve conflict generated by the proposed siting of a facility. General procedures are described for site screening and selection, site characterization, site evaluation, and preparation of the license application; specific procedures for several individual states are discussed. The report also examines the steps involved in the formal licensing process, including docketing and initial processing, preparation of an environmental impact statement, technical review, hearings, and decisions. It is concluded that development of effective communication between parties in conflict and the utilization of techniques to manage and resolve conflicts represent perhaps the most significant challenge for the people involved in LLW disposal in the next decade. 18 refs., 6 figs.

  1. Post-hoc simulation study to adopt a computerized adaptive testing (CAT) for a Korean Medical License Examination.

    Science.gov (United States)

    Seo, Dong Gi; Choi, Jeongwook

    2018-05-17

    Computerized adaptive testing (CAT) has been adopted in license examinations due to a test efficiency and accuracy. Many research about CAT have been published to prove the efficiency and accuracy of measurement. This simulation study investigated scoring method and item selection methods to implement CAT in Korean medical license examination (KMLE). This study used post-hoc (real data) simulation design. The item bank used in this study was designed with all items in a 2017 KMLE. All CAT algorithms for this study were implemented by a 'catR' package in R program. In terms of accuracy, Rasch and 2parametric logistic (PL) model performed better than 3PL model. Modal a Posteriori (MAP) or Expected a Posterior (EAP) provided more accurate estimates than MLE and WLE. Furthermore Maximum posterior weighted information (MPWI) or Minimum expected posterior variance (MEPV) performed better than other item selection methods. In terms of efficiency, Rasch model was recommended to reduce test length. Simulation study should be performed under varied test conditions before adopting a live CAT. Based on a simulation study, specific scoring and item selection methods should be predetermined before implementing a live CAT.

  2. Licensing the California low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Dressen, A.L.; Serie, P.J.; Junkert, R.

    1992-01-01

    California has made significant progress toward the issuance of a license to construct and operate the Southwestern Compact's low-level radioactive waste disposal facility. However, obstacles to completing construction and preparing to receive waste still exist. This paper will describe the technical licensing issues, EIR/S process, political events, and public interactions that have impacted on California regulators' ability to complete the license application review and reach a decision on issuing a license. Issues associated with safely and liability evaluations, finalization of the environmental impact report, and land transfer processes involving multiple state, federal, and local agencies will be identified. Major issues upon which public and political opposition is focusing will also be described. (author)

  3. Upgrades and their training impact

    International Nuclear Information System (INIS)

    Geise, W.B.

    1991-01-01

    In January, 1990, implementation of thermal hydraulic and core model upgrades to the Brunswick Simulator was completed. Static and dynamic NRC examination preparation, Licensed Operator Requalification training and training material development had to be completed to support an April, 1990's NRC exam date. Dramatic simulator improvements resulted in expanded performance. Unfortunately, insufficient time was available to fully retrain operators before their examinations. Because of this and other factors, the examinations resulted in 14 of 20 operators failing the dynamic simulator examination. The following paper describes the BSEP simulator impact on Licensed Training in 1990

  4. Risk and environmental impact assessment: nuclear and environmental licensing interface

    International Nuclear Information System (INIS)

    Costa, Eduardo M.; Monteiro, Iara A.

    1997-01-01

    The main aims of this paper are the identification and discussion of interfaces and application of common concepts in the existing nuclear and environmental licensing procedures. Risk and impact assessment of nuclear electricity generation are two of these concepts which are discussed detail. The risk concept, which had initially focused on engineering projects, has been extended to many other areas of human activity. Risk resulting from the use of ionization radiation has been associated to the dose for the critical members of the public. Therefore, radiation protection applies basic dose limits which are established in national and international recommendations. These recommendations are increasing the emphasis to keep all the exposures to ionizing radiation as low as reasonable achievable, economical and social factors being taken into account. On the other hand, environmental impact assessment has been used as a tool in planning and decision-making processes, thus including environmental concern in the discussion of social and economical development strategies. This paper aims to discuss the association of these two concepts by presenting the procedures of control of radiological impact during normal operation of a nuclear power plant and the various forms of risk communication to the public in the case of events occurrence. (author). 13 refs

  5. Licensing aspects regarding the RBMN project

    International Nuclear Information System (INIS)

    Cuccia, Valeria; Sacramento, Arivaldo M.; Aleixo, Bruna L.; Ferreira, Vinicius V.M.

    2013-01-01

    The licensing process of a waste disposal facility is a complex and demanding undertaking. It proceeds in phases, starting with the site selection and ending many decades later, when the radionuclides decayed and no longer offer possible hazard. That is one of the reasons why the licensing process for the Brazilian repository for low and intermediate level radioactive waste (RBMN Project) is a challenge for all the technicians involved. Besides that, the only national experience associated to this subject arose after a radiological accident in the State of Goias, in 1987. Two different institutions are involved in this licensing process: IBAMA, for environmental licensing, and CNEN, for nuclear licensing. Both of them will evaluate the possible impacts caused by the waste disposal, so it is essential to avoid conflicts and duplications of activities. The RBMN project has different teams for each main activity, and one of them is the Licensing group. This team has been planning the licensing activities for the repository, studying the legal framework and estimating costs and execution time for each step. This paper presents the status of the licensing activities regarding to the RBMN project done by the CNEN staff. (author)

  6. Does the seal licensing system in Scotland have a negative impact on seal welfare?

    Directory of Open Access Journals (Sweden)

    Laetitia Nunny

    2016-08-01

    Full Text Available This study examined the licensing system that permits seal shooting in Scotland, which was established under Part 6 Conservation of Seals of the Marine (Scotland Act 2010. Four approaches were used: data were collated and analyzed from both the Scottish Government and Scottish Marine Animal Stranding Scheme; a survey was sent to current license holders and informal interviews were conducted with key stakeholder types. Between February 2011 and the end of October 2015, 1229 gray seals and 275 common seals were reported shot under license to the Scottish Government. The numbers of seals reported as shot has reduced year-on-year since the licensing system was put in place. While some license holders, notably fish farms, were using some non-lethal forms of deterrent to reduce seal-related damage, these were often used alongside seal shooting. Of the seals reported as shot to the Scottish Government, only a small percentage were also reported to the Scottish Marine Animal Stranding Scheme, despite this being a licensing requirement. Only 2.3% of the shot gray seals and 4.5% of the shot common seals were necropsied. There is evidence from these necropsies that some seals had not died instantly or had not been shot in the manner recommended by the Scottish Seal Management Code of Practice. These preliminary results show that more carcasses need to be recovered and necropsied if the welfare implications of current seal shooting practice are to be properly assessed. The current legislation does not specify closed seasons to protect breeding seals and thirty-five per cent of necropsied seals were pregnant gray seals. Seals have also been shot during their lactation periods when pups are dependent on their mothers. This raises significant welfare concerns. The re-introduction of closed seasons specific to each species of seal is recommended along with greater effort to deploy non-lethal methods. Independent assessment of the number of seals being killed

  7. Essays on the economics of licensing nuclear power plants

    International Nuclear Information System (INIS)

    Cohen, L.R.

    1979-01-01

    Regulation and licensing of nuclear power plants by the United States Atomic Energy Commission and the United States Nuclear Regulatory Commission are discussed. Chapter 1 overviews the licensing process and issues raised in licensing cases. Based on a sample of plants licensed between 1967 and 1978, a statistical study of the impact of public participation in licensing is performed. The study concludes that public participation has had a major impact on licensing and power-plant costs. The impact is due to a fundamental weakness of the Commissions: their inability to resolve certain issues related to acceptable social risk. The study has important policy implications for reforming the Federal licensing process. Chapter 2 contains an analysis of the Price-Anderson Act, a Federal program for compensating victims of large nuclear accidents. The Price-Anderson Act is placed within the context of generalized federal disaster relief. A model is developed that allows an evaluation programs on the basis of moral hazard and equity principles. Chapter 3 analyzes the Nuclear Regulatory Commission's treatment of its mandatory antitrust review of applicants for nuclear power plants. The main conclusion of the chapter is that the reviews have not addressed the central economic issues of antitrust that are relevant to nuclear power. Instead, the reviews contribute to further cartelization of the electric utility industry. While politically expedient, the reviews are counter-productive to the development of an optimal industry structure

  8. What are the impacts of giving up the driver license?

    DEFF Research Database (Denmark)

    Siren, Anu Kristiina; Haustein, Sonja

    Objectives: Driving cessation is a gradual process, where driver’s self-regulation plays an important role. Age-based license renewal procedures may interfere with this process and trigger premature driving cessation. The present study compares drivers aged 69 years at the baseline who either...... should try to prevent unwarranted mobility loss. Licensing policies signaling that in old age continuing to drive is an exception rather than the rule may work against this goal....... renewed their driver’s license (“renewers”) or did not (“non-renewers”) over a two-year period. Methods: Data were collected by interviewing a sample of older Danish people in 2009 (n = 1,792) and in 2012 (n = 863). The standardized interviews covered respondents’ background information, health and well...

  9. Varying levels of difficulty index of skills-test items randomly selected by examinees on the Korean emergency medical technician licensing examination.

    Science.gov (United States)

    Koh, Bongyeun; Hong, Sunggi; Kim, Soon-Sim; Hyun, Jin-Sook; Baek, Milye; Moon, Jundong; Kwon, Hayran; Kim, Gyoungyong; Min, Seonggi; Kang, Gu-Hyun

    2016-01-01

    The goal of this study was to characterize the difficulty index of the items in the skills test components of the class I and II Korean emergency medical technician licensing examination (KEMTLE), which requires examinees to select items randomly. The results of 1,309 class I KEMTLE examinations and 1,801 class II KEMTLE examinations in 2013 were subjected to analysis. Items from the basic and advanced skills test sections of the KEMTLE were compared to determine whether some were significantly more difficult than others. In the class I KEMTLE, all 4 of the items on the basic skills test showed significant variation in difficulty index (P<0.01), as well as 4 of the 5 items on the advanced skills test (P<0.05). In the class II KEMTLE, 4 of the 5 items on the basic skills test showed significantly different difficulty index (P<0.01), as well as all 3 of the advanced skills test items (P<0.01). In the skills test components of the class I and II KEMTLE, the procedure in which examinees randomly select questions should be revised to require examinees to respond to a set of fixed items in order to improve the reliability of the national licensing examination.

  10. Varying levels of difficulty index of skills-test items randomly selected by examinees on the Korean emergency medical technician licensing examination

    Directory of Open Access Journals (Sweden)

    Bongyeun Koh

    2016-01-01

    Full Text Available Purpose: The goal of this study was to characterize the difficulty index of the items in the skills test components of the class I and II Korean emergency medical technician licensing examination (KEMTLE, which requires examinees to select items randomly. Methods: The results of 1,309 class I KEMTLE examinations and 1,801 class II KEMTLE examinations in 2013 were subjected to analysis. Items from the basic and advanced skills test sections of the KEMTLE were compared to determine whether some were significantly more difficult than others. Results: In the class I KEMTLE, all 4 of the items on the basic skills test showed significant variation in difficulty index (P<0.01, as well as 4 of the 5 items on the advanced skills test (P<0.05. In the class II KEMTLE, 4 of the 5 items on the basic skills test showed significantly different difficulty index (P<0.01, as well as all 3 of the advanced skills test items (P<0.01. Conclusion: In the skills test components of the class I and II KEMTLE, the procedure in which examinees randomly select questions should be revised to require examinees to respond to a set of fixed items in order to improve the reliability of the national licensing examination.

  11. Environmental-impact appraisal related to special nuclear materials. License No. SNM-696; Docket No. 70-734

    International Nuclear Information System (INIS)

    1983-06-01

    This Environmental Impact Appraisal is issued by the US Nuclear Regulatory Commission in response to an application by GA Technologies, Inc., (GA) for renewal of Special Nuclear Material (SNM) License No. SNM-696 covering plant operations at San Diego, California. The proposed action provides for continuing research, development, and production activities involving SNM, uranium enriched in the U-235 and U-233 isotopes, and plutonium

  12. The "Clubs against Drugs" program in Stockholm, Sweden: two cross-sectional surveys examining drug use among staff at licensed premises

    Directory of Open Access Journals (Sweden)

    Gripenberg Abdon Johanna

    2011-02-01

    Full Text Available Abstract Background The objective of this study is to examine self-reported drug use among staff at licensed premises, types of drugs used, attitudes towards drugs, and observed drug use among guests. Results are presented from two measurement points (in 2001 and 2007/08. This study was carried out within the framework of the "Clubs against Drugs" program, which is a community-based multi-component intervention targeting licensed premises in Stockholm, Sweden. Methods Two cross-sectional surveys were conducted, the first in 2001 and the second in 2007/08. Staff at licensed premises attending server training were asked to participate in the anonymous survey. A survey was administered in a classroom setting and consisted of four sections: 1 demographics, 2 respondents' own drug use experience, 3 respondents' attitudes towards drug use, and 4 observed drug use among guests at licensed premises. Results Data were collected from 446 staff in 2001 and 677 staff in 2007/08. The four most commonly used drugs among staff were cannabis, cocaine, amphetamine, and ecstasy. The highest rates of drug use were reported by staff in the two youngest age groups, i.e., those younger than 25 and those between the ages of 25 and 29. In 2007/08 staff reported significantly lower rates of drug use than staff in 2001. Last year drug use for the sample in 2007/08 was 19% compared to 27% for the 2001 sample. While drug-using staff compared to non drug-using staff reported more observations of drug use among guests, they were less inclined to intervene. Overall, staff reported restrictive attitudes towards drugs. Conclusions The prevalence of life-time and last year drug use among staff at licensed premises is high compared to the general population in Sweden. Lower rates of self-reported drug use among staff were reported in 2007/08. The results of this study highlight that staff at licensed premises represent an important target population in club drug prevention

  13. What it took to get an NRC license for centralized incineration

    International Nuclear Information System (INIS)

    DiSalvo, R.; Zielenbach, W.

    1987-01-01

    In 1982, Battelle joined five other commercial generators of low level radioactive waste in conducting a study of the technical and economic feasibility and the licensability of a central facility for incinerating LLW. The project generated a license application to the USNRC and supporting documentation related to the safety and environmental impacts of the facility. After thorough review, the NRC has issued a Finding of No Significant Impact and the associated license authorization, which is the first of its kind for an incineration facility

  14. Graduated driver licensing and differential deterrence: The effect of license type on intentions to violate road rules.

    Science.gov (United States)

    Poirier, Brigitte; Blais, Etienne; Faubert, Camille

    2018-01-01

    In keeping with the differential deterrence theory, this article assesses the moderating effect of license type on the relationship between social control and intention to violate road rules. More precisely, the article has two objectives: (1) to assess the effect of license type on intentions to infringe road rules; and (2) to pinpoint mechanisms of social control affecting intentions to violate road rules based on one's type of driver license (a restricted license or a full license). This effect is examined among a sample of 392 young drivers in the province of Quebec, Canada. Drivers taking part in the Graduated Driver Licensing (GDL) program have limited demerit points and there is zero tolerance for drinking-and-driving. Propensity score matching techniques were used to assess the effect of the license type on intentions to violate road rules and on various mechanisms of social control. Regression analyses were then conducted to estimate the moderating effect of license type. Average treatment effects from propensity score matching analyses indicate that respondents with a restricted license have lower levels of intention to infringe road rules. While moral commitment and, to a lesser extent, the perceived risk of arrest are both negatively associated with intentions to violate road rules, the license type moderates the relationship between delinquent peers and intentions to violate road rules. The effect of delinquent peers is reduced among respondents with a restricted driver license. Finally, a diminished capability to resist peer pressure could explain the increased crash risk in months following full licensing. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. United States Medical Licensing Examination and American Board of Pediatrics Certification Examination Results: Does the Residency Program Contribute to Trainee Achievement.

    Science.gov (United States)

    Welch, Thomas R; Olson, Brad G; Nelsen, Elizabeth; Beck Dallaghan, Gary L; Kennedy, Gloria A; Botash, Ann

    2017-09-01

    To determine whether training site or prior examinee performance on the US Medical Licensing Examination (USMLE) step 1 and step 2 might predict pass rates on the American Board of Pediatrics (ABP) certifying examination. Data from graduates of pediatric residency programs completing the ABP certifying examination between 2009 and 2013 were obtained. For each, results of the initial ABP certifying examination were obtained, as well as results on National Board of Medical Examiners (NBME) step 1 and step 2 examinations. Hierarchical linear modeling was used to nest first-time ABP results within training programs to isolate program contribution to ABP results while controlling for USMLE step 1 and step 2 scores. Stepwise linear regression was then used to determine which of these examinations was a better predictor of ABP results. A total of 1110 graduates of 15 programs had complete testing results and were subject to analysis. Mean ABP scores for these programs ranged from 186.13 to 214.32. The hierarchical linear model suggested that the interaction of step 1 and 2 scores predicted ABP performance (F[1,1007.70] = 6.44, P = .011). By conducting a multilevel model by training program, both USMLE step examinations predicted first-time ABP results (b = .002, t = 2.54, P = .011). Linear regression analyses indicated that step 2 results were a better predictor of ABP performance than step 1 or a combination of the two USMLE scores. Performance on the USMLE examinations, especially step 2, predicts performance on the ABP certifying examination. The contribution of training site to ABP performance was statistically significant, though contributed modestly to the effect compared with prior USMLE scores. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. NRC analysis of the environmental impacts and licensing policies for expanded spent fuel storage in the United States

    International Nuclear Information System (INIS)

    Smith, C.V. Jr.

    1978-01-01

    This paper reviews the findings of the U.S. environmental impact studies on spent fuel storage to the year 2000, addresses design criteria for independent spent fuel storage installations and expresses the position of the NRC for licensing expanded spent fuel storage capabilities until such time as final solutions are established

  17. Open Science: Open source licenses in scientific research

    OpenAIRE

    Guadamuz, Andres

    2006-01-01

    The article examines the validity of OSS (open source software) licenses for scientific, as opposed to creative works. It draws on examples of OSS licenses to consider their suitability for the scientific community and scientific research.

  18. May compact storage facilities be licensed

    International Nuclear Information System (INIS)

    Gleim, A.; Winter, G.

    1980-01-01

    The authors examine as potential statements fo fact for licensing so-called compact storage facilities for spent fuel elements Sec. 6 to 9c of the German Atomic Energy Act and Sec. 4 of the German Radiation Protection Ordinance. They find that none of these provisions were applicable to compact stroage facilities. In particular, the storage of spent fuel elements was no storage of nuclear fuels licensable under Sec. 6 of the Atomic Energy Act, because Sec. 6 did not cover spent fuel elements. Also in the other wording of the Atomic Energy Act there was no provision, which could be used as a statement of fact for licensing compact storage facilities. Such facilities could not be licensed and, for that reason, were not permitted. (IVR) [de

  19. A new licensing strategy for Canadian mobile earth stations

    Science.gov (United States)

    Amero, Ronald G.

    1990-01-01

    Initiatives presently under consideration by the Department of Communications which will greatly simplify the licensing process for mobile earth stations are addressed. The current licensing approach is reviewed and the limitations of that system identified. A new approach is needed to respond to the needs of mobile satellite users in the 1990's and beyond, one which will have a minimal impact on the user while still respecting the legislative responsibilities of the department under the new Radiocommunication Act and the General Radio Regulations. The objective of this new strategy is to lead to a transparent licensing scheme for the end user, which in turn could lead to license exemption of blanket licenses as soon as possible.

  20. [Environmental licensing of major undertakings: possible connection between health and environment].

    Science.gov (United States)

    Silveira, Missifany; Araújo Neto, Mário Diniz de

    2014-09-01

    The prospect of multidisciplinary assessment that considers the environmental impacts on the health of the population during the implementation of potentially polluting projects is incipient in Brazil. Considering the scenario of major undertakings in the country, broadening the outlook on the health and environment relationship based on social and economic development processes striving for environmentally sustainable projects is a key strategy. This article examines the debate on the relationship between the current development model, the risks, the environment and health and discusses the importance of the participation of the health sector in the environmental licensing procedures, which is the instrument of the Environmental Impact Assessment (EIA). Seeking to create more environmentally and socially sustainable territories, the health sector has been looking for opportunities to participate in the licensing processes of major undertakings from the EIA standpoint. Results of research conducted by the Ministry of Health have demonstrated the form of participation in these processes, highlighting the strengths and weaknesses that favor or hinder the increase of preventive actions in public health in the implementation of major undertakings in Brazil.

  1. What are the impacts of giving up the driver license?

    OpenAIRE

    Siren, Anu Kristiina; Haustein, Sonja

    2013-01-01

    Objectives: Driving cessation is a gradual process, where driver’s self-regulation plays an important role. Age-based license renewal procedures may interfere with this process and trigger premature driving cessation. The present study compares drivers aged 69 years at the baseline who either renewed their driver’s license (“renewers”) or did not (“non-renewers”) over a two-year period.Methods: Data were collected by interviewing a sample of older Danish people in 2009 (n = 1,792) and in 2012...

  2. Oil and gas development in Greenland: A social license to operate, trust and legitimacy in environmental governance

    NARCIS (Netherlands)

    Smits, C.; Leeuwen, van J.; Tatenhove, van J.P.M.

    2017-01-01

    Since the turn of the century, Greenland has been examining the possibilities to develop its potential oil and gas resources. The large scale oil and gas activities will impact the small Greenlandic society, both positively and negatively. In this paper we employ the concept of a social license to

  3. NRC Analysis of the environmental impacts and licensing policies for expanded spent fuel storage in the United States

    International Nuclear Information System (INIS)

    Clifford, V.S.

    1978-01-01

    The findings of the U.S. environmental impact studies on spent fuel storage to the year 2000 are reviewed, the design criteria for independent spent fuel storage installations are addressed and the position of the NRC for licensing expanded spent fuel storage capabilities, until such time as final solutions are established, is expressed. (author)

  4. Evaluation of Factors Affecting E-Bike Involved Crash and E-Bike License Plate Use in China Using a Bivariate Probit Model

    Directory of Open Access Journals (Sweden)

    Yanyong Guo

    2017-01-01

    Full Text Available The primary objective of this study is to evaluate factors affecting e-bike involved crash and license plate use in China. E-bike crashes data were collected from police database and completed through a telephone interview. Noncrash samples were collected by a questionnaire survey. A bivariate probit (BP model was developed to simultaneously examine the significant factors associated with e-bike involved crash and e-bike license plate and to account for the correlations between them. Marginal effects for contributory factors were calculated to quantify their impacts on the outcomes. The results show that several contributory factors, including gender, age, education level, driver license, car in household, experiences in using e-bike, law compliance, and aggressive driving behaviors, are found to have significant impacts on both e-bike involved crash and license plate use. Moreover, type of e-bike, frequency of using e-bike, impulse behavior, degree of riding experience, and risk perception scale are found to be associated with e-bike involved crash. It is also found that e-bike involved crash and e-bike license plate use are strongly correlated and are negative in direction. The result enhanced our comprehension of the factors related to e-bike involved crash and e-bike license plate use.

  5. Licensing Uncertain Patents: Per-Unit Royalty vs Up-Front Fee

    OpenAIRE

    Encaoua , David; Lefouili , Yassine

    2008-01-01

    ED EPS; In this paper we examine the implications of uncertainty over patent validity on patentholders' licensing strategies. Two licensing mechanisms are examined: per-unit royalty and up-front fee.We provide conditions under which uncertain patents are licensed in order to avoid patent litigation. It is shown that while it is possible for the patentholder to reap som e "extra profit" by selling an uncertain patent under the pure per-unit royalty regime, the opportunity to do so does not exi...

  6. The Environmental Impact Statement and its role in the nuclear licensing procedure

    International Nuclear Information System (INIS)

    Dolde, K.P.

    1995-01-01

    The author discusses the implementation in Germany of the EC Directive on Environmental Impact Statements in the light of the legal tradition and concepts of law in Germany, especially in the context of the nuclear licensing procedure. His analysis reveals some legal provisions and legal concepts in existing German law that will have to be ''sacrificed'' in order to do justice to the European Union, as in the formation of the body of EC law governing environmental issues, the Anglo-Saxon approach to regulatory law has been the prevailing line of orientation (the EU ecological audit being an example). On the whole, however, the implementation of the EU Directive will not lead to substantial changes beyond procedural modifications. (HP) [de

  7. Recent developments in Canadian nuclear power plant licensing practices

    International Nuclear Information System (INIS)

    Marchildon, P.

    1985-06-01

    This paper examines the dominant factors which have influenced the safety evaluation and licensing process of current 600 MW reactors. It describes possible modifications to the process which are being considered for the licensing of a second 600 MW reactor at Point Lepreau. The key element is a firm licensing agreement covering the entire licensing cycle, to be established between the proponent and the AECB before a construction licence is issued. Progress accomplished to date in reaching such an agreement is described

  8. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  9. Four Essays on Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    &D strategies. On the supply side, the existing literature has been focused on understanding how technology licensing can be used by firms as a mechanism to recover investments in innovative activities and to foster learning opportunities. On the demand side, it has been shown that licensing is an important...... source that firms can tap into to feed their internal needs for innovative knowledge. While several studies have examined technology licensing through the lens of the licensor, research on how firms rely on licensing contracts to acquire knowledge and improve their innovation performance still leaves......Licensing contracts represent one of the most widely used mechanisms to exchange technologies and transfer know-how between firms. Due to the opportunities that licensing creates for firms operating on both sides of the markets for technology, it has increasingly become an integral part of firms’ R...

  10. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  11. Correlations between the scores of computerized adaptive testing, paper and pencil tests, and the Korean Medical Licensing Examination

    Directory of Open Access Journals (Sweden)

    Mee Young Kim

    2005-06-01

    Full Text Available To evaluate the usefulness of computerized adaptive testing (CAT in medical school, the General Examination for senior medical students was administered as a paper and pencil test (P&P and using CAT. The General Examination is a graduate examination, which is also a preliminary examination for the Korean Medical Licensing Examination (KMLE. The correlations between the results of the CAT and P&P and KMLE were analyzed. The correlation between the CAT and P&P was 0.8013 (p=0.000; that between the CAT and P&P was 0.7861 (p=0.000; and that between the CAT and KMLE was 0.6436 (p=0.000. Six out of 12 students with an ability estimate below 0.52 failed the KMLE. The results showed that CAT could replace P&P in medical school. The ability of CAT to predict whether students would pass the KMLE was 0.5 when the criterion of the theta value was set at -0.52 that was chosen arbitrarily for the prediction of pass or failure.

  12. Environmental Impact Appraisal for renewal of special nuclear material license No. SNM-42 (Docket No. 70-27)

    International Nuclear Information System (INIS)

    1984-03-01

    The Babcock and Wilcox Company (B and W) Naval Nuclear Fuel Division (NNFD) facility near Lynchburg, Virginia, produces fuel assemblies and complete fuel modules for reactors used in the US Navy nuclear propulsion program and fuel components for university and other research reactors; and processes scrap material to recover the enriched uranium content. No significant modifications of the production procedures for the US Navy nuclear fuel fabrication have been made since the previous environmental assessment, and none are anticipated during the five-year license renewal period being considered. In 1982 the fabrication of fuel assemblies for university and other research reactors was begun. This environmental assessment provides a review of the past five years of operation and an analysis of future impacts, including the effect of plant changes. The proposed action is the renewal of the license necessary for B and W to continue the existing fuel fabrication operations. Principal operations in the fabrication facility include the processing of highly enriched uranium (> 90% 235 U) into fuel elements and assembling the elements into complete reactor cores for shipment and eventual installation in US Navy facilities. The principal environmental impacts of current operation of the NNFD result from release of radioactive gases to the atmosphere and of radioactively contaminated liquids to the adjacent James River. The actual gaseous and liquid pollutants released during normal operation of the plant have been monitored and documented. The principal subjects addressed in this environmental assessment include water use, pollutant controls, environmental monitoring, and environmental impact of operation and accidents. Other site factors and plant operations necessary for this assessment are described, and aspects of insignificant impacts are identified. 10 figures, 36 tables

  13. Location, location, location: Assessing the spatial patterning between marijuana licenses, alcohol outlets and neighborhood characteristics within Washington state.

    Science.gov (United States)

    Tabb, Loni Philip; Fillmore, Christina; Melly, Steven

    2018-04-01

    The availability of marijuana products is becoming increasingly prevalent across the United States (US), many states are allowing for the production, processing, and retailing of these products for medical and/or recreational use. The purpose of this study is to: (1) examine the spatial patterning of marijuana licenses, and (2) examine the impact of alcohol outlets in addition to other neighborhood characteristics on marijuana licenses within the state of Washington. This cross-sectional observational study examined 1458 census tracts in Washington state from 2017, using marijuana and alcohol data from the Washington State Liquor and Cannabis Board as well as neighborhood characteristics data from the American Community Survey 2011-2015 5-year estimates. We used exploratory and formal spatial regression methods, including integrated nested Laplace approximation within a Bayesian statistical framework, to address the study aims. Our results indicate there is significant spatial patterning of marijuana producers and processors across the state. We also found that all marijuana licenses are located in poorer census tracts, and marijuana retailers are co-located in census tracts with off-premises alcohol outlets. Our study provides empirical evidence of the relationship between marijuana licenses, alcohol outlets, and neighborhood characteristics, and has important implications for policymakers in other states currently considering legalizing marijuana-products for medical and/or recreational use. Copyright © 2018 Elsevier B.V. All rights reserved.

  14. A survey of collection development for United States Medical Licensing Examination (USMLE) and National Board Dental Examination (NBDE) preparation material.

    Science.gov (United States)

    Hendrix, Dean; Hasman, Linda

    2008-07-01

    The research sought to ascertain medical and dental libraries' collection development policies, evaluation methods, purchase decisions, and issues that relate to print and electronic United States Medical Licensing Examination (USMLE) and National Board Dental Examination (NBDE) preparation materials. The investigators surveyed librarians supporting American Association of Medical Colleges (AAMC)-accredited medical schools (n = 58/125) on the USMLE and librarians supporting American Dental Association (ADA)-accredited dental schools (n = 23/56) on the NBDE. The investigators analyzed the data by cross-tabulating and filtering the results using EFM Continuum web survey software. Investigators also surveyed print and electronic USMLE and NBDE preparation materials from 2004-2007 to determine the number of publications and existence of reviews. A majority of responding AAMC libraries (62%, n = 58) provide at least 1 electronic or online USMLE preparation resource and buy an average of 11.6 print USMLE titles annually. Due to a paucity of NBDE print and electronic resources, ADA libraries bought significantly fewer print resources, and only 1 subscribed to an electronic resource. The most often reported evaluation methods for both populations were feedback from medical or dental students, feedback from medical or dental faculty, and online trials. Some AAMC (10%, n = 58) and ADA libraries (39%, n = 23) libraries reported that no evaluation of these materials occured at their libraries. From 2004-2007, publishers produced 45 USMLE preparation resources (total n = 546) to every 1 NBDE preparation resource (total n = 12). Users' needs, institutional missions and goals, financial status, and official collection policies most often underlie decisions to collect or not collect examination preparation materials. Evaluating the quality of examination preparation materials can be problematic due to lack of published reviews, lack of usability testing by libraries, and

  15. Generic data sources for the update of an environmental report in support of license renewal

    International Nuclear Information System (INIS)

    Mauro, John J.

    1991-01-01

    Over the past 2 years, our organization has been providing assistance to the NUMARC PLEX working group in matters pertaining to the environmental impacts of license renewal. Part of this support was the identification of data sets and publications that may be useful to the NRC in the preparation of their Environment Report Supplements (ERSs). The following presents a strategy for preparing an ERS, along with references and data sets pertinent to each ER topic. Each section of the ERS should present the following information: (1) Updated information on plant design and operating experience, along with projections of the plant impacts through the end of its currently licensed period of operation. These impacts are used as a baseline against which to compare the projected impacts for the period of license renewal. In addition, the baseline impacts may be compared to the impacts projected in the plant's original Environmental Report and Environmental Impact Statement. (2) Projections of how the impacts may change during the period of license renewal. The purpose of this information will be to determine the degree to which the projected impacts differ significantly from the impacts presented in the original ER and those that have actually occurred during the period of plant operation. We believe that the ERS will reveal that (1) the actual impacts that have occurred during the period of plant operation are comparable to, or less than, those predicted in the original ER, (2) many impacts have been decreasing with time, such as routine radioactive emissions, and (3) the impacts predicted for the period of license renewal will be comparable to, or less than, the baseline impacts. (author)

  16. 78 FR 14126 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-04

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... of the document. The E-Filing system also distributes an email notice that provides access to the... Completion Time has no impact on the consequences of any design basis accident since the consequences of an...

  17. 10 CFR 55.21 - Medical examination.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Medical examination. 55.21 Section 55.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Medical Requirements § 55.21 Medical examination. An applicant for a license shall have a medical examination by a physician. A licensee shall have a medical...

  18. Methodology to identify, review, and evaluate components for license renewal

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gregor, F.E.; Walker, R.S.

    1988-01-01

    A methodology has been developed to systematically identify, review, and evaluate plant equipment for license renewal. The method builds upon the existing licensing basis, operating history, and accepted deterministic and probabilistic techniques. Use of these approaches provides a focus for license renewal upon those safety-significant systems and components that are not routinely replaced, refurbished, or subject to detailed inspection as part of the plant's existing test, maintenance, and surveillance programs. Application of the method identified the PWR and BWR systems that should be subjected to detailed license renewal review. Detailed examination of two example systems demonstrates the approach. The review and evaluation of plant equipment for license renewal differ from the initial licensing of the plant. A substantial operating history has been established, the licensing basis has evolved from the original one, and plant equipment has been subject to periodic maintenance and surveillance throughout its life. In consideration of these differences, a basis for license renewal is needed. License renewal should be based upon continuation of the existing licensing basis and recognition of existing programs and operating history

  19. 78 FR 37281 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses

    Science.gov (United States)

    2013-06-20

    ... factors: (1) License renewal will involve nuclear power plants for which the environmental impacts of...) Changes in the environment around nuclear power plants are gradual and predictable. The 1996 GEIS improved... environmental impacts that may occur from renewing commercial nuclear power plant operating licenses; (2...

  20. Public licenses and public domain as alternatives to copyright

    OpenAIRE

    Köppel, Petr

    2012-01-01

    The work first introduces the area of public licenses as a space between the copyright law and public domain. After that, consecutively for proprietary software, free and open source software, open hardware and open content, it maps particular types of public licenses and the accompanying social and cultural movements, puts them in mutual as well as historical context, examines their characteristics and compares them to each other, shows how the public licenses are defined by various accompan...

  1. Workplace Violence and Job Outcomes of Newly Licensed Nurses

    OpenAIRE

    Chang, Hyoung Eun; Cho, Sung-Hyun

    2016-01-01

    Purpose: The purpose of this study was to examine the prevalence of workplace violence toward newly licensed nurses and the relationship between workplace violence and job outcomes. Methods: An online survey was conducted of newly licensed registered nurses who had obtained their license in 2012 or 2013 in South Korea and had been working for 5–12 months after first being employed. The sample consisted of 312 nurses working in hospitals or clinics. The Copenhagen Psychosocial Questionnaire...

  2. Study of a conceptual nuclear energy center at Green River, Utah: licensing considerations

    International Nuclear Information System (INIS)

    Dowdle, M.; Russell, R.; Zillman, D.

    1982-04-01

    This report examines the laws governing the location of a 9-unit nuclear energy center (NEC) near Green River, Utah. The time frame being considered for development of the conceptual NEC is from 1995 to 2013. Accordingly, the report is forced to speculate about some aspects of the plant, its site and its construction. Most of the report examines existing legal requirements for constructing an NEC. Where pertinent, changes in the law are discussed that would affect an NEC that is to be licensed in one or two decades. In general, no insurmountable legal problems exist that would prevent an NEC from being licensed at the Green River location. Several legal requirements pose significant concerns and would have to be faced before an NEC could be built. Among the major legal constraints are radiation protection, regulatory approval of financing, access to water, and local zoning restrictions. Two other constraints that involve legal matters are the wisdom of standardization of the units and the responsibility of the NEC builder to correct socio-economic impacts on the local area

  3. Are study strategies related to medical licensing exam performance?

    Science.gov (United States)

    West, Courtney; Kurz, Terri; Smith, Sherry; Graham, Lori

    2014-11-02

    To examine the relationship between study strategies and performance on a high stakes medical licensing exam entitled the United States Medical Licensing Examination Step 1. The action research project included seventy nine student participants at the Texas A & M Health Science Center College of Medicine during their pre-clinical education. Data collection included pre-matriculation and matriculation academic performance data, standardized exam data, and the Learning and Study Strategies Instrument. Multiple regression analyses were conducted. For both models, the dependent variable was the Step 1 score, and the independent variables included Medical College Admission Test, Undergraduate Grade Point Average, Year 1 Average, Year 2 Average, Customized National Board of Medical Examiners Average, Comprehensive Basic Science Exam score, and Learning and Study Strategy Instrument sub-scores. Model 2 added Comprehensive Basic Science Self-Assessment average. Concentration (Model 1 - β = .264; Model 2 - β = .254) was the only study strategy correlated with Step 1 performance. The other statistically significant predictors were Customized National Board of Medical Examiners Average (β = .315) and Year 2 Average (β = .280) in Model 1 and Comprehensive Basic Science Self-Assessment Average (β = .338) in Model 2. There does appear to be a relationship between the study strategy concentration and Step 1 licensing exam performance. Teaching students to practice and utilize certain techniques to improve concentration skills when preparing for and taking exams may help improve licensing exam scores.

  4. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  5. Demarcation of the licensing and supervisory procedures for nuclear engineering installations

    International Nuclear Information System (INIS)

    Schattke, H.

    1986-01-01

    The remarks can be summed up under 12 points: 1) The protective purpose outlined in Paragraph 1 No. 2 of the Atomic Energy Law is the top priority for both licensing and regulatory authorities. 2) Both authorities must aim at the best possible prevention of hazards and precautions against risks. 3) The licensing procedures cover applications for licenses, the regulatory procedures check and supervise actual activities. 4) The licensing procedures take precedence in chronology and in substance over the regulatory procedure. 5) The licensing procedure is a preliminary check on the intention to carry out nuclear activities before the event; whereas the regulatory procedure controls the licensee after the event to ensure that the latter's activities really do conform to the framework laid down in the license. 6) The licensing procedure must be verified by state supervision with regard to its prognostic activity. 7) The examination criteria are largely identical for both the authorites. 8) The examination tools for the licensing and regulatory authorities also coincide to a large extent. Legal differences in the possible means of enforcement have no effect in practice. 9) Decisions made by either authority can be either in the licensee's favour or to its disadvantage. Nevertheless, the contents of decisions differ widely between the two authorities. 10) The regulatory authorities execute and prepare the decisions of the licensing authorites. 11) Licensing decisions can be designated static/prognostic, whereas regulatory measures accompany the actual performance of the plant and the operating personnel in a dynamic/controlling manner. 12) Regulatory instructions are usually of a temporary nature, whereas licensing actions are permanent as a rule. (orig.) [de

  6. ISO and software quality assurance - licensing and certification of software professionals

    Energy Technology Data Exchange (ETDEWEB)

    Hare, J.; Rodin, L.

    1997-11-01

    This report contains viewgraphs on licensing and certifing of software professionals. Discussed in this report are: certification programs; licensing programs; why became certified; certification as a condition of empolyment; certification requirements; and examination structures.

  7. [The Medical Examination - Between Desire and Reality - Analysis of Consensus Between the Second Part of the Medical Licensing Exam (IMPP) and the National Catalogue of Expertise-based Learning Goals in Surgery (NKLC)].

    Science.gov (United States)

    Sterz, Jasmina; Rüsseler, Miriam; Britz, Vanessa; Stefanescu, Christina; Hoefer, Sebastian H; Adili, Farzin; Schreckenbach, Teresa; Schleicher, Iris; Weber, Roxane; Hofmann, Hans-Stefan; Voß, Friedericke; König, Sarah; Heinemann, Markus K; Kadmon, Martina

    2017-12-01

    Background The working party of the German Society for Surgery (DGCH) on undergraduate surgical education has developed a national expertise-based catalogue of learning goals in surgery (NKLC). This study analyses the extent to which the questions of the German second medical licensing examination compiled by the IMPP are congruent with the NKLC and which thematic focus is emphasised. Materials and Methods Firstly, a guideline and evaluation sheet were developed in order to achieve documentation of the individual examination questions of the second licensing examination with respect to the learning goals of the NKLC. In a retrospective analysis from autumn 2009 to autumn 2014, eleven licensing examinations in human medicine were screened independently by three different reviewers. In accordance with the guideline, the surgical questions were identified and subsequently matched to the learning goals of the NKLC. The analysis included the number of surgical learning goals as well as the number of surgical questions for each examination, learning goal, and different levels of expertise (LE). Results Thirteen reviewers from six surgical disciplines participated in the analysis. On average, reviewers agreed on the differentiation between surgical and non-surgical questions in 79.1% of all 3480 questions from 11 licensing examinations. For each examination (n = 320 questions), 98.8 ± 22.6 questions (min.: 69, max.: 150) were rated as surgical. For each surgical learning goal addressed, 2.2 ± 0.3 questions (min.: 1, max.: 16) were asked. For each examination, 23.5 ± 6.3 questions (min.: 11; max.: 31) referred to learning goals of LE 3, 52.5 ± 16.7 questions (min.: 34; max.: 94) addressed learning goals of LE 2 and 22.8 ± 7.7 questions (min.: 9; max.: 34) were related to learning goals of LE 1. 64 learning goals (27.8% of all learning goals of the NKLC) were not reflected in the examinations. With a total of 70 questions, the most frequently

  8. Eco-Technology Licensing under Emission Tax: Royalty vs. Fixed-Fee

    OpenAIRE

    Seung-Leul Kim; Sang-Ho Lee

    2014-01-01

    This article considers the licensing strategies of eco-technology when an innovator provides pollution abatement goods to oligopolistic polluting firms that produce consumption goods and emit environmental pollutants. In the presence of emission tax, two types of licensing contracts, royalty and fixed-fee, are examined to analyze market equilibrium and to compare their welfare consequences. We show that an eco-innovator provides a non-exclusive license under a royalty contract while it might ...

  9. Regulations and the licensing process in Austria

    International Nuclear Information System (INIS)

    Matulla, Herbert U.

    1979-01-01

    A review of the licensing process which took place from 1971 to 1978 shows which laws, regulations and standards were used in checking the safety aspects of the nuclear power plant and which organisations participated in the licensing process. The internal organisation of the Austrian main-expert in the procedure is illustrated. Examples of detail-work are explained. The importance of intensive co-operation of the different technical groups and the problems of comparable examination depth are underlined. (author)

  10. Licensing operators for commercial nuclear power plants

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1988-01-01

    The human element in the operation of commercial nuclear power plants is of utmost importance. Not only must the operators be technically competent in the execution of numerous complicated tasks, they must be capable of working together as a team to diagnose dynamic plant conditions to ensure that their plants are operated safely. The significance of human interaction skills and crew communications has been demonstrated most vividly in TMI and Chernobyl. It follows that the NRC must retain its high standards for licensing operators. This paper discusses activities and initiatives being employed by the NRC to enhance the reliability of its licensing examinations, and to build a highly qualified examiner work force

  11. Economic implications of nuclear plant license renewal in the U.S

    International Nuclear Information System (INIS)

    Smith, L.J.

    2001-01-01

    The NRC and the nuclear industry struggled for many years with the development of a viable license renewal rule. Now that a workable rule appears to have been developed, and the first license renewal applicants have received renewed licenses, the floodgates have opened and a large number of nuclear utilities have announced intentions to seek renewed NRC operating licenses. In this time when profound changes are being experienced in the electric generation markets in the United States, nuclear plant license renewal can have several economic effects that should be considered by utilities prior to the pursuit of an NRC license renewal. This paper examines some of the factors that may be affected by the prospect of an additional 20-year operating life of a nuclear plant. (author)

  12. Applicability of Item Response Theory to the Korean Nurses' Licensing Examination

    Directory of Open Access Journals (Sweden)

    Geum-Hee Jeong

    2005-06-01

    Full Text Available To test the applicability of item response theory (IRT to the Korean Nurses' Licensing Examination (KNLE, item analysis was performed after testing the unidimensionality and goodness-of-fit. The results were compared with those based on classical test theory. The results of the 330-item KNLE administered to 12,024 examinees in January 2004 were analyzed. Unidimensionality was tested using DETECT and the goodness-of-fit was tested using WINSTEPS for the Rasch model and Bilog-MG for the two-parameter logistic model. Item analysis and ability estimation were done using WINSTEPS. Using DETECT, Dmax ranged from 0.1 to 0.23 for each subject. The mean square value of the infit and outfit values of all items using WINSTEPS ranged from 0.1 to 1.5, except for one item in pediatric nursing, which scored 1.53. Of the 330 items, 218 (42.7% were misfit using the two-parameter logistic model of Bilog-MG. The correlation coefficients between the difficulty parameter using the Rasch model and the difficulty index from classical test theory ranged from 0.9039 to 0.9699. The correlation between the ability parameter using the Rasch model and the total score from classical test theory ranged from 0.9776 to 0.9984. Therefore, the results of the KNLE fit unidimensionality and goodness-of-fit for the Rasch model. The KNLE should be a good sample for analysis according to the IRT Rasch model, so further research using IRT is possible.

  13. The nuclear licensing procedure

    International Nuclear Information System (INIS)

    Wagner, H.

    1976-01-01

    To begin with, the present nuclear licensing procedure is illustrated by a diagram. The relationship between the state and the Laender, the various experts (GRS - IRS + LRA -, TUEV, DWD, university institutes, firms of consulting engineers, etc), participation of the public, e.g. publication of the relevant documents, questions, objections (made by individuals or by groups such as citizens' initiatives), public discussion, official notice, appeals against the decision, the right of immediate execution of the decision are shortly dealt with. Finally, ways to improve the licensing procedure are discussed, from the evaluation of the documents to be submitted, published, and examined by the authorities (and their experts) up to an improvement of the administrative procedure. An improved licensing procedure should satisfy the well-founded claims of the public for more transparency as well as the equally justifiable claims of industry and utilities in order to ensure that the citizens' legal right to have safe and adequate electric power is guaranteed. The updated energy programme established by the Federal Government is mentioned along with the effectiveness of dealing with nuclear problems on the various levels of a Land government. (orig.) [de

  14. Environmental impact appraisal for renewal of source material license No. SUB-526 (Docket No. 40-3392)

    International Nuclear Information System (INIS)

    1984-05-01

    Allied Chemical Company operates a privately owned UF 6 production facility at Metropolis, Illinois, At this facility, uranium ore concentrates are converted into uranium hexafluoride (UF 6 ). The UF 6 product from this facility is shipped to Department of Energy (DOE) gaseous diffusion plants for enrichment of the 235 U isotope. This assessment: (1) reviews the operation of the facility during the recent license period by comparing the plant effluent releases or environmental monitoring data with permissible levels of contaminants; and (2) determines the impact on the environment from continued operation of the facility in its current configuration. 10 figures, 44 tables

  15. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  16. Systems engineering and the licensing of Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kulesa, T., E-mail: tkulesa@us.ibm.com [IBM, Philidelphia, Pennsylvania (United States); Soderholm, K., E-mail: Kristiina.Soderholm@fortum.com [Fortum Power (Finland); Fechtelkotter, P., E-mail: pfech@us.ibm.com [IBM, Boston, Massacheusets (United States)

    2014-07-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  17. Systems engineering and the licensing of Small Modular Reactors

    International Nuclear Information System (INIS)

    Kulesa, T.; Soderholm, K.; Fechtelkotter, P.

    2014-01-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  18. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  19. The impact of reliability centered maintenance on plant prospects for license renewal

    International Nuclear Information System (INIS)

    Elliott, J.O.; Nakahara, Y.

    1991-01-01

    Much attention has been directed in recent years to means of extending nuclear power plant life. As many plants enter their third decade of service, the questions loom large of how to keep aging plants reliable, as well as how to assure reliability and safety to an extent sufficient to warrant license renewal at the end of the current licensing term. Concurrently the nuclear industry has seen a growing interest in reducing the cost and complexity of maintenance activities while at the same time improving plant reliability and availability. Attainment of these seemingly contradictory aims is being aided by the introduction of a maintenance philosophy developed originally by the airline industry and subsequently applied with great success both in that industry and the U.S. military services. Reliability Centered Maintenance (RCM), in its basic form, may be described as a consideration of reliability and maintenance problems from a systems level approach, allowing a focus on preservation of system functions as the aim of a maintenance program optimized for both safety and economics. It is this systematic view of plant maintenance, with the emphasis on preservation of overall functions rather than individual parts and components which sets RCM apart from past nuclear plant maintenance philosophies. It is also the factor which makes application of RCM an ideal first step in development of strategies for life extension and license renewal, both for aging plants, and for plants just beginning their first license term

  20. Temporary authorization for use: does the French patient access programme for unlicensed medicines impact market access after formal licensing?

    Science.gov (United States)

    Degrassat-Théas, Albane; Paubel, Pascal; Parent de Curzon, Olivier; Le Pen, Claude; Sinègre, Martine

    2013-04-01

    To reach the French market, a new drug requires a marketing authorization (MA) and price and reimbursement agreements. These hurdles could delay access to new and promising drugs. Since 1992, French law authorizes the use of unlicensed drugs on an exceptional and temporary basis through a compassionate-use programme, known as Temporary Authorization for Use (ATU). This programme was implemented to improve early access to drugs under development or authorized abroad. However, it is suspected to be inflationary, bypassing public bodies in charge of health technology assessment (HTA) and of pricing. The aim of this study is to observe the market access after the formal licensing of drugs that went through this compassionate-use programme. We included all ATUs that received an MA between 1 January 2005 and 30 June 2010. We first examined market access delays from these drugs using the standard administrative path. We positioned this result in relation to launch delays observed in France (for all outpatient drugs) and in other major European markets. Second, we assessed the bargaining power of a hospital purchaser after those drugs had obtained an MA by calculating the price growth rate after the approval. During the study period, 77 ATUs were formally licensed. The study concluded that, from the patient's perspective, licensing and public bodies' review time was shortened by a combined total of 36 months. The projected 11-month review time of public bodies may be longer than delays usually observed for outpatient drugs. Nonetheless, the study revealed significant benefits for French patient access based on comparable processing to launch time with those of other European countries with tight price control policies. In return, a 12 % premium, on average, is paid to pharmaceutical companies while drugs are under this status (sub-analysis on 56 drugs). In many instances, the ATU programme responds to a public health need by accelerating the availability of new drugs

  1. 7 CFR 61.30 - Examination of sampler.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Examination of sampler. 61.30 Section 61.30... Cottonseed Samplers § 61.30 Examination of sampler. Each applicant for a license as a sampler and each... examination or test to show his ability properly to perform the duties for which he is applying for a license...

  2. New Jersey's license plate decal requirement for graduated driver licenses: attitudes of parents and teenagers, observed decal use, and citations for teenage driving violations.

    Science.gov (United States)

    McCartt, Anne T; Oesch, Nathan J; Williams, Allan F; Powell, Tara Casanova

    2013-01-01

    On May 1, 2010, New Jersey implemented a law requiring teenagers with learner's permits or probationary licenses to display reflective decals on the front and rear license plates when they drive. The current study examined attitudes of parents and teenagers toward this requirement, use of decals, and reported violations and police enforcement of the graduated driver license law. Statewide telephone surveys of representative samples of parents and teenagers were conducted in February to April 2010 and March to June 2011. Use of decals among probationary license holders was observed at 4 high schools in fall 2010 and in spring 2011 and hand-out surveys were distributed. Data on citations issued for violations of the graduated driver license law were obtained. When interviewed in spring 2011, a large majority of parents of probationary license holders, parents of learner's permit holders, and teenagers with probationary licenses disapproved of decals for probationary licenses. About two thirds of both sets of parents and about half of teenagers disapproved of decals for learner's permits. Support for decals for both license types declined significantly from 2010 to 2011. For parents and teenagers alike, opposition was mainly attributed to concern about identifying and/or targeting teenage drivers by other drivers, predators, or police. In 2011, 77 percent of parents of probationary license holders said that their teenagers had decals for the vehicles driven most often; 46 percent said their teenagers always used decals. Fifty-six percent of parents of learner's permit holders said that their teenagers had decals for the vehicles driven most often; 37 percent said that their teenagers always used decals. Teenagers' reported violations of license restrictions either increased or were similar in 2011 compared to 2010. Observed rates of decal use by probationary license holders at high schools in spring 2011 ranged from 24 to 64 percent. The number of statewide citations

  3. Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

    International Nuclear Information System (INIS)

    Watson, B.A.; Buckley, J.T.; Craig, C.M.

    2006-01-01

    Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs

  4. Safeguards at NRC licensed facilities: Are we doing enough

    International Nuclear Information System (INIS)

    Asselstine, J.K.

    1986-01-01

    The Nuclear Regulatory Commission is pursuing a number of initiatives in the safeguards area. The Commission is conducting a reassessment of its safeguards design basis threat statements to consider the possible implications of an explosive-laden vehicle for U.S. nuclear safeguards and to examine the comparability of safeguards features at NRC-licensed and DOE facilities. The Commission is also completing action on measures to protect against the sabotage threat from an insider at NRC-licensed facilities, and is examining the potential safety implications of safeguards measures. Finally, the NRC has developed measures to reduce the theft potential for high-enriched uranium

  5. An overview of the class I structures license renewal industry report

    International Nuclear Information System (INIS)

    Renfro, L.J.; Statton, J.A.

    1991-01-01

    License renewal of a commercial nuclear power plant requires verification that systems, structures and components important to license renewal can perform their intended safety functions throughout the license renewal term. The verification of this continuing performance includes a technical evaluation of the effects of age-related degradation. An industry report (IR) sponsored by the nuclear industry was developed which identifies potentially significant age-related degradation mechanisms that may affect Class I structures and evaluates their impact on the ability of the structures to continue to perform their safety functions. Preventive and/or mitigative options are outlined for managing degradation mechanisms that could significantly affect plant performance during the license renewal period. This paper provides a summary of the IR. (author)

  6. To License or Not to License Remanufacturing Business?

    Directory of Open Access Journals (Sweden)

    Zu-Jun Ma

    2018-01-01

    Full Text Available Many original equipment manufacturers (OEMs face the choice of whether to license an independent remanufacturer (IR to remanufacture their used products. In this paper, we develop closed-loop supply chain models with licensed and unlicensed remanufacturing operations to analyze the competition and cooperation between an OEM and an IR. The OEM sells new products and collects used products through trade-ins, while the IR intercepts the OEM’s cores to produce remanufactured products and sell them in the same market. We derive optimal decisions for each of the two types of firms in licensed and unlicensed remanufacturing scenarios and identify conditions under which the OEM and the IR would be most likely to cooperate with each other in implementing remanufacturing. The results show although it is beneficial for an OEM to license an IR to remanufacture its cores, it is not always necessary for an IR to accept OEM’s authorization. Moreover, we contrast the result for licensed remanufacturing scenario in the decentralized system with that in the centrally coordinated system to quantify potential inefficiency resulting from decentralization of decision making.

  7. ISO 14000 and the nuclear licensing

    International Nuclear Information System (INIS)

    Martins, Nadia Soido Falcao

    1999-01-01

    As concern grows for maintaining and improving the quality of the environment and protecting human health, all the world is turning its attention to the potential environmental in pact of their industrial activities. One of the most important contribution in that way is the International Standard ISO 14000 series. In the utilization of nuclear energy, right from the inception, the safety of personnel, environment and the population has been the basic consideration. Over the years well established licenses criteria have been proposed to limit and control the environmental impact of the plant operation and emergencies situation. In this paper are discussed some specific requirements for implementation of the environmental management system specified by ISO 14000 compared to the environmental requirements for nuclear licensing. (author)

  8. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  9. Open licenses and their compliance with the new private law (new civil code)

    OpenAIRE

    Kráľ, Štefan

    2013-01-01

    Computer programs are widely licensed under open (public, open source, free) licenses. This thesis examines whether the open license (especially GNU GPL) is in compliance with the Czech law and which business models are used to generate profit distributing open computer programs. On the basis of analysis of legislation, case law and doctrinal literature the author assesses whether open licenses are admissible under the new Civil Code. The thesis also provides an overview of commonly used busi...

  10. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  11. 47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.

    Science.gov (United States)

    2010-10-01

    ... class of license or endorsement specified below must pass, or otherwise receive credit for, the... endorsement. 13.201 Section 13.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS Examination System § 13.201 Qualifying for a commercial operator license or endorsement...

  12. Libraries and licensing

    Directory of Open Access Journals (Sweden)

    Maja Žumer

    2001-01-01

    Full Text Available In the mid 90s, the abundance of various electronic publications exposed libraries to the problems of licensing electronic content. Various licensing principles have been prepared recently to help libraries in the process; it can be said that in general, the knowledge of licensing issues has improved in libraries of all types. Libraries form consortia in order to gain stronger negotiating positions and obtain better conditions.In the article, new licensing principles are presented in more detail, as well as some domestic and foreign experiences with consortia forming.

  13. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  14. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  15. Environmental assessment for renewal of source material license No. STB-401 (Docket No. 40-6563)

    International Nuclear Information System (INIS)

    1987-04-01

    This Environmental Assessment contains an assessment of the environmental impact associated with the renewal of the license to operate the Columbian-Tantalum (Cv-Ta) Plant of Mallinckrodt, Inc. at St. Louis, Missouri, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51 (10 CFR Part 51), as amended, of the Nuclear Regulatory Commission regulations. This assessment examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with plant operation. Operational impacts are not anticipated on terrestrial and aquatic ecological resources (including endangered or threatened species) nor on historic and archaeological sites. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project related to land use and employment are anticipated to be minimal

  16. Improvement suggestions on license extension management for civil nuclear safety equipment activities

    International Nuclear Information System (INIS)

    Sun Xingjian; Liu Hongji; Han Guoli; Jia Fengcai

    2013-01-01

    Based on the concepts of Clear Requirements, Comprehensive Review, Objective Assessment, Dynamic Management, this paper gives improvement suggestions on license extension management for civil nuclear safety equipment design, manufacture, installation and non-destructive examination activities, which include establishing a relatively unified license extension review standard, combining multi-views and close linking license review and supervision, full utilizing the daily supervision and inspection results, as well as further improving motivation and elimination mechanism. (authors)

  17. Impact of ITER liquid metal design options on safety level and licensing - Sweden

    International Nuclear Information System (INIS)

    Harfors, C.; Devell, L.; Johansson, Kjell; Lundell, B.; Rolandsson, S.

    1993-01-01

    The safety level and licensability of five design options for ITER coolant, breeding material and structural material are assessed, with emphasis on some specified accident scenarios. The safety level is assessed in terms of barrier requirements and the feasibility to construct and qualify such a barrier. The licensability in Sweden of each design option is assessed based on the indicated safety level and on a judgement of the technical feasibility to construct and qualify the ITER tokamak itself, based on the selected design option. 20 refs

  18. Management of the licensing of users of radioactive materials should be improved

    International Nuclear Information System (INIS)

    1976-01-01

    Radioactive material licenses are required for manufacturing nuclear fuel for reactors and for industrial, commercial, medical, and educational uses of radioactive materials. This type of license is not for constructing or operating nuclear power reactors and facilities for processing used nuclear fuels. This report discusses the need for better management improvements in the NRC's program for licensing the users. As of December 31, 1974, there were 8,253 active NRC-issued material licenses held by 6,310 licensees. The study reviewed NRC's policies, procedures, and practices, and examined recent evaluations of state programs to identify problems encountered by the states

  19. Licensing of spent fuel storage facility including its physical protection in the Czech Republic

    International Nuclear Information System (INIS)

    Fajman, V.; Sedlacek, J.

    1992-01-01

    The current spent fuel management policies as practised in the Czech Republic are described, and the conception of the fuel cycle back end is outlined. The general principles and the legislative framework are explained of the licensing process concerning spent fuel interim storage facilities, including the environmental impact assessment component. The history is outlined of the licensing process for the spent fuel storage facility at the Dukovany NPP site, including the licensing of the transport and storage cask. The basic requirements placed on the physical safeguarding of the facility and on the licensing process are given. (J.B.). 13 refs

  20. Development model to public hearing for environmental licensing of nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Vasques, Luciana Gomes; Aquino, Afonso Rodrigues de, E-mail: lu_vasques@usp.br, E-mail: araquino@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    The use of nuclear technology has always been a matter of concern from an environmental point of view. Although disputed, the generation of electricity in nuclear reactors was considered a source of clean emission in relation to emission of gases responsible for the greenhouse effect. In Brazil, nuclear activities are regulated and supervised by the Brazilian Commission of Nuclear Energy - CNEN. Environmental issues associated with nuclear activities are described by CONAMA, and the developments in this area are licensed by IBAMA, regardless of obtaining nuclear licenses issued by CNEN. Obtaining environmental licenses (prior, installation and operation) depends initially on preparing the Environmental Impact Study - EIS and the Environmental Impact Report - EIR, consisting of a presentation of EIS in language accessible to all. EIR is forwarded to bodies and entities with some connection to the enterprise, to be manifested with IBAMA about the relevance of its content. This information serves as a resource for Public Hearings, which are meetings organized by entrepreneurs, conducted by IBAMA, and rely on public participation, can be considered as a licensing step. Public Hearings are subject to subjectivity, and the model proposed in this research becomes more objective ill-defined, difficult to understand actions for the entrepreneur. (author)

  1. Development model to public hearing for environmental licensing of nuclear facilities

    International Nuclear Information System (INIS)

    Vasques, Luciana Gomes; Aquino, Afonso Rodrigues de

    2015-01-01

    The use of nuclear technology has always been a matter of concern from an environmental point of view. Although disputed, the generation of electricity in nuclear reactors was considered a source of clean emission in relation to emission of gases responsible for the greenhouse effect. In Brazil, nuclear activities are regulated and supervised by the Brazilian Commission of Nuclear Energy - CNEN. Environmental issues associated with nuclear activities are described by CONAMA, and the developments in this area are licensed by IBAMA, regardless of obtaining nuclear licenses issued by CNEN. Obtaining environmental licenses (prior, installation and operation) depends initially on preparing the Environmental Impact Study - EIS and the Environmental Impact Report - EIR, consisting of a presentation of EIS in language accessible to all. EIR is forwarded to bodies and entities with some connection to the enterprise, to be manifested with IBAMA about the relevance of its content. This information serves as a resource for Public Hearings, which are meetings organized by entrepreneurs, conducted by IBAMA, and rely on public participation, can be considered as a licensing step. Public Hearings are subject to subjectivity, and the model proposed in this research becomes more objective ill-defined, difficult to understand actions for the entrepreneur. (author)

  2. Reactor licensing

    International Nuclear Information System (INIS)

    Harvie, J.D.

    2002-01-01

    This presentation discusses reactor licensing and includes the legislative basis for licensing, other relevant legislation , the purpose of the Nuclear Safety and Control Act, important regulations, regulatory document, policies, and standards. It also discusses the role of the CNSC, its mandate and safety philosophy

  3. Safeguards at NRC licensed facilities: Are we doing enough

    International Nuclear Information System (INIS)

    Asselstine, J.K.

    1986-01-01

    Safeguards at the Nuclear Regulatory Commission (NRC) facilities are discussed in this paper. The NRC is pursuing a number of initiatives in the safeguards area. The Commission is conducting a reassessment of its safeguards design basis threat statements to consider the possible implications of an explosive-laden vehicle for U.S. nuclear safeguards and to examine the comparability of safeguards features at NRC-licensed and DOE facilities. The Commission is also completing action on measures to protect against the sabotage threat from an insider at NRC-licensed facilities, and is examining the potential safety implications of safeguards measures. Finally, the NRC has developed measures to reduce the theft potential for high-enriched uranium

  4. 14 CFR 420.17 - Bases for issuance of a license.

    Science.gov (United States)

    2010-01-01

    ...) Issuing a license would not jeopardize foreign policy or national security interests of the United States... § 420.15; (2) The FAA has completed an analysis of the environmental impacts associated with the...

  5. Licensing in an international triopoly

    Science.gov (United States)

    Ferreira, Fernanda A.; Ferreira, Flávio

    2011-12-01

    We study the effects of entry of two foreign firms on domestic welfare in the presence of licensing, when the incumbent is technologically superior to the entrants. We consider two different situations: (i) the cost-reducing innovation is licensed to both entrants; (ii) the cost-reducing innovation is licensed to just one of the entrants. We analyse three kind of license: (lump-sum) fixed-fee; (per-unit) royalty; and two-part tariff, that is a combination of a fixed-fee and a royalty. We prove that a two part tariff is never an optimal licensing scheme for the incumbent. Moreover, (i) when the technology is licensed to the two entrants, the optimal contract consists of a licensing with only output royalty; and (ii) when the technology is licensed to just one of the entrants, the optimal contract consists of a licensing with only a fixed-fee.

  6. Computer Software: Copyright and Licensing Considerations for Schools and Libraries. ERIC Digest.

    Science.gov (United States)

    Reed, Mary Hutchings

    This digest notes that the terms and conditions of computer software package license agreements control the use of software in schools and libraries, and examines the implications of computer software license agreements for classroom use and for library lending policies. Guidelines are provided for interpreting the Copyright Act, and insuring the…

  7. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... Conditions § 431.73 Continuing accuracy of license application; application for modification of license. (a...

  8. Licensing arrangements and the development of the solar energy industry

    Energy Technology Data Exchange (ETDEWEB)

    Green, M.

    1979-06-01

    The process by which technology and information related to technology are transferred within industry is explored. Property rights in technology are part of the broader field of intellectual property. The general contours of legal protection for knowledge are explored. The four basic forms of intellectual property - patents, trade secrets (or know-how), trademarks, and copyrights - are covered in varying degrees of depth, depending on their relative applicability to the development of the solar industry. Once this background has been established, the legal aspects of licensing are examined. A license is a legal arrangement whereby a party (licensor) who controls the right to use an idea, invention, etc. shares the right to use the particular intellectual property with someone else (licensee). The advantages and disadvantages of licensing are described from the point of view of potential licensees and licensors. Barriers to licensing are discussed.

  9. Licensed Healthcare Facilities

    Data.gov (United States)

    California Natural Resource Agency — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  10. 2015 Business Licenses

    Data.gov (United States)

    City of Jackson, Mississippi — This data displays all business license information for the year of 2015. This information details license classifications and status. This information will updated...

  11. Teenagers' licensing decisions and their views of licensing policies: a national survey.

    Science.gov (United States)

    Williams, Allan F

    2011-08-01

    One objective was to determine teenage licensing rates on a national basis, interest in early licensure, and reasons for delay. A second objective was to learn teenagers' opinions about licensing policies, important in states considering ways to upgrade their current licensing systems. One thousand three hundred eighty-three 15- to 18-year-olds completed an online survey in November 2010. They were drawn from a nationally representative panel of US households recruited using probability-based sampling. The panel included cell phone-only households, and Internet access was provided to those without it. Weighting procedures were applied so that the study population represented the national US population of 15- to 18-year-olds. Most teens said that they were interested in getting a license as soon as legally possible, but many had not started the process. At 16, teens were about equally divided among those who had not started, those in the learner stage, and those with a restricted or full license. At 18, 62 percent had full licenses; 22 percent had not started. For those old enough to start, lack of a car, costs, parent availability, ability to get around without a car, and being busy with other activities were leading reasons for delay. The majority of teens were not in favor of higher licensing ages. Forty-six percent thought the minimum learner age should be 16; 30 percent thought the full license age should be 18 or older. The majority approved of night (78%) and passenger (57%) restrictions, and 85 and 93 percent endorsed cell phone and texting bans, respectively. When these policies were packaged together in a single law that included an age 16 start, night, passenger, cell phone and texting bans, and a full license at age 18, 74 percent of teens were in favor. Teenagers are not as supportive of strong licensing policies as parents of teens, but there is evidence that they will support comprehensive policies likely to lead to further reductions in teen crash

  12. Radiopharmaceutical licensing

    International Nuclear Information System (INIS)

    Mather, S.J.

    1992-01-01

    Recent health service legislation, and especially the loss of crown immunity has once again focussed attention on the arrangements for licensing of radiopharmaceuticals. The aim of the article is to describe in general terms the UK licensing system and in particular to provide guidance to those responsible for the supply of radiopharmaceuticals in hospitals. (author)

  13. Librarian Certification and Licensing: A Brief Accounting.

    Science.gov (United States)

    Kaatrude, Peter B.

    1992-01-01

    Examines certification and licensing of librarians in the United States and Canada from the perspective of differences between the two concepts and through historical analysis of applications of each. A contextual framework for studying applications of these concepts to other professions is provided. (nine references) (MES)

  14. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  15. The SLOWPOKE licensing model

    Energy Technology Data Exchange (ETDEWEB)

    Snell, V. G.; Takats, F.; Szivos, K.

    1989-08-15

    The SLOWPOKE Energy System (SES-10) is a 10 MW heating reactor that has been developed in Canada. It will be capable of running without a licensed operator in continuous attendance, and will be sited in urban areas. It has forgiving safety characteristics, including transient time-scales of the order of hours. A process called `up-front` licensing has been evolved in Canada to identify, and resolve, regulatory concerns early in the process. Because of the potential market in Hungary for nuclear district heating, a licensing plan has been developed that incorporates Canadian licensing experience, identifies specific Hungarian requirements, and reduces the risk of licensing delays by seeking agreement of all parties at an early stage in the program.

  16. License to build

    International Nuclear Information System (INIS)

    Huntelaar, Mark; Vos, Renate de; Roobol, Lars

    2007-01-01

    Full text: A new license under the nuclear power act is applied for at the Dutch Government for the building of a High Active Repackaging Unit (HAVA-VU in Dutch) at NRG in Petten, The Netherlands. This new building is necessary to comply with our nuclear license to dispose of high active nuclear waste at Petten to the intermediate storage facility (COVRA). In the first part of this paper attention is given to the formal procedure followed by the Government, what type of documents are to be submitted, what time frames are followed, how citizen participation is organized, and as final result a new license. In the second part more detailed information is given about the present license renewal needed for the High Active Repackaging Unit

  17. SSM's licensing review of a spent nuclear fuel repository in Sweden

    International Nuclear Information System (INIS)

    Dverstorpand, Bjoern; Stroemberg, Bo

    2014-01-01

    On 16 March 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted license applications for a general license to construct, possess and operate a KBS-3 type spent nuclear fuel repository at the Forsmark site, in Oesthammar municipality, and an encapsulation plant in Oskarshamn municipality. The KBS-3 method, which has been developed by SKB over a period of more than 30 years, entails disposing of the spent fuel in copper canisters, surrounded by a swelling bentonite clay, at about 500 m depth in crystalline basement rock. SKB's applications are being evaluated in parallel by the Swedish Radiation Safety Authority (SSM) according to the Act on Nuclear Activities and by the Land and Environmental Court according to the Environmental Code. During the review SSM will act as an expert review body to the Land and Environmental Court in the areas of radiation protection, safety and security/non-proliferation. Both SSM and the court will produce a statement with a recommendation regarding a licensing decision and licensing conditions to the government. The government will make the final decision after consulting the municipalities concerned by SKB's facilities (municipal veto applies). The current licensing decision is just one of several licensing decisions that will be required for the repository. However it is arguably the most important one, because it is the last licensing stage with a broad societal involvement including an environmental impact assessment (EIA) process, national consultations and municipal veto for the concerned municipalities. The licensing steps to follow, should SKB be granted a license by the government, only require approval by SSM. These steps include application for start of actual construction work, test operation and routine operation. (authors)

  18. Radioisotope thermoelectric generator licensed hardware package and certification tests

    International Nuclear Information System (INIS)

    Goldmann, L.H.; Averette, H.S.

    1994-01-01

    This paper presents the Licensed Hardware package and the Certification Test portions of the Radioisotope Thermoelectric Generator Transportation System. This package has been designed to meet those portions of the Code of Federal Regulations (10 CFR 71) relating to ''Type B'' shipments of radioactive materials. The detailed information for the anticipated license is presented in the safety analysis report for packaging, which is now in process and undergoing necessary reviews. As part of the licensing process, a full-size Certification Test Article unit, which has modifications slightly different than the Licensed Hardware or production shipping units, is used for testing. Dimensional checks of the Certification Test Article were made at the manufacturing facility. Leak testing and drop testing were done at the 300 Area of the US Department of Energy's Hanford Site near Richland, Washington. The hardware includes independent double containments to prevent the environmental spread of 238 Pu, impact limiting devices to protect portions of the package from impacts, and thermal insulation to protect the seal areas from excess heat during accident conditions. The package also features electronic feed-throughs to monitor the Radioisotope Thermoelectric Generator's temperature inside the containment during the shipment cycle. This package is designed to safely dissipate the typical 4500 thermal watts produced in the largest Radioisotope Thermoelectric Generators. The package also contains provisions to ensure leak tightness when radioactive materials, such as a Radioisotope Thermoelectric Generator for the Cassini Mission, planned for 1997 by the National Aeronautics and Space Administration, are being prepared for shipment. These provisions include test ports used in conjunction with helium mass spectrometers to determine seal leakage rates of each containment during the assembly process

  19. Evaluation of Terminated Nuclear Material Licenses

    International Nuclear Information System (INIS)

    Spencer, K.M.; Zeighami, E.A.

    1999-01-01

    This report presents the results of a six-year project that reviewed material licenses that had been terminated during the period from inception of licensing until approximately late-1994. The material licenses covered in the review project were Part 30, byproduct material licenses; Part 40, source material licenses; and Part 70, special nuclear material licenses. This report describes the methodology developed for the project, summarizes the findings of the license file inventory process, and describes the findings of the reviews or evaluations of the license files. The evaluation identified nuclear material use sites that need review of the licensing material or more direct follow-up of some type. The review process also identified licenses authorized to possess sealed sources for which there was incomplete or missing documentation of the fate of the sources

  20. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    International Nuclear Information System (INIS)

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act

  1. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  2. A test bed for investigating and evaluating the use of biometric-encoded driver licenses and their impact on law enforcement

    Science.gov (United States)

    Messner, Richard A.; Hludik, Frank; Crowley, Todd A.; Vidacic, Dragan; Stetson, Barrett; Nadel, Lawrence D.; Nichols, Linda J.; Harris, Carol

    2004-08-01

    This paper describes the results of a collaborative effort between the University of New Hampshire (UNH) and the Mitretek Systems (MTS) Center for Criminal Justice Technology (CCJT). Mitretek conducted an investigation into the impact of anticipated biometrically encoded driver licenses (DLs) on law enforcement. As part of this activity, Mitretek teamed with UNH to leverage the results of UNH's Project54 and develop a pilot Driver License Interoperability Test Bed to explore both implementation and operational aspects associated with reading and authenticating biometrically encoded DLs in law enforcement scenarios. The test bed enables the exploration of new methods, techniques (both hardware and software), and standards in a structured fashion. Spearheaded by the American Association of Motor Vehicle Administrators (AAMVA) and the International Committee for Information Technology Standards Technical Group M1 (INCITS-M1) initiatives, standards involving both DLs and biometrics, respectively, are evolving at a rapid pace. In order to ensure that the proposed standards will provide for interstate interoperability and proper functionality for the law enforcement community, it is critical to investigate the implementation and deployment issues surrounding biometrically encoded DLs. The test bed described in this paper addresses this and will provide valuable feedback to the standards organizations, the states, and law enforcement officials with respect to implementation and functional issues that are exposed through exploration of actual test systems. The knowledge gained was incorporated into a report prepared by MTS to describe the anticipated impact of biometrically encoded DLs on law enforcement practice.

  3. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  4. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  5. 31 CFR 596.306 - License.

    Science.gov (United States)

    2010-07-01

    ... ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.306 License. Except as otherwise specified, the term license means any license or...

  6. Understanding Licensing Behavior

    DEFF Research Database (Denmark)

    Cabaleiro, Goretti; Moreira, Solon; Reichstein, Toke

    The potential for rent dissipation has been argued to be the main cause of firms? licensing out behavior being stifled.However, this aspect has been scarcely studied empirically. We draw on rent dissipation arguments, and hypothesize that firms suffering from the not-invented-here (NIH) syndrome......, firms in competitive product markets, and firms that have incurred substantial sunk cost are associated with lower rates of technology out-licensing. We also posit that sunk costs negatively moderate the relationship between competition in the licensor?s product market, and licensing rate. We test our...

  7. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  8. What is the impact of commercial test preparation courses on medical examination performance?

    Science.gov (United States)

    McGaghie, William C; Downing, Steven M; Kubilius, Ramune

    2004-01-01

    Commercial test preparation courses are part of the fabric of U.S. medical education. They are also big business with 2,000 sales for 1 firm listed at nearly $250 million. This article systematically reviews and evaluates research published in peer-reviewed journals and in the "grey literature" that addresses the impact of commercial test preparation courses on standardized, undergraduate medical examinations. Thirteen computerized English language databases were searched using 29 search terms and search concepts from their onset to October 1, 2002. Also manually searched was medical education conference proceedings and publications after the end date; and medical education journal editors were contacted about articles accepted for publication, but not yet in print, that were deemed pertinent to this review. Studies that met three criteria were selected: (a) a commercial test preparation course or service was an educational intervention, (b) the outcome variable was one of several standardized medical examinations, and (c) results are published in a peer-reviewed journal or another outlet that insures scholarly scrutiny. The criteria were applied and data extracted by consensus of 2 reviewers. The search identified 11 empirical studies, of which 10 (8 journal articles, 2 unpublished reports) are included in this review. Qualitative data synthesis and tabular presentation of research methods and outcomes are used. The articles and unpublished reports reveal that current research lacks control and rigor; the incremental validity of the commercial courses on medical examination performance, if any, is extremely small; and evidence in support of the courses is weak or nonexistent; almost no details are given about the form and conduct of the commercial test preparation courses; studies are confined to courses in preparation for the Medical College Admission Test, the former National Board of Medical Examiners Part 1, and the United States Medical Licensing Examination

  9. Initiatives in transport cask licensing

    International Nuclear Information System (INIS)

    Patterson, John

    1998-01-01

    The variations in research reactor fuel form, configuration, irradiation characteristics, and transport cask have required a substantial number of transport cask licensing actions associated with foreign research reactor spent fuel transportation. When compounded by limited time for shipment preparations, due to contract timing or delayed receipt of technical data, the number and timing of certifications has adversely impacted the ability of regulatory agencies to support intended shipping schedules. This issue was brought into focus at a april, 1998 meeting among DOE, the US Nuclear Regulatory Commission, and DOE's spent fuel transportation contractors. (author)

  10. Regulatory analysis for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    This regulatory analysis provides the supporting information for the final rule (10 CFR Part 54) that defines the Nuclear Regulatory Commission's requirements for renewing the operating licenses of commercial nuclear power plants. A set of four specific alternatives for the safety review of license renewal applications is defined and evaluated. These are: Alternative A-current licensing basis; Alternative B-extension of Alternative A to require assessment and managing of aging; Alternative C -- extension of Alternative B to require assessment of design differences against selected new-plant standards using probabilistic risk assessment; and Alternative D -- extension of Alternative B to require compliance with all new-plant standards. A quantitative comparison of the four alternatives in terms of impact-to-value ratio is presented, and Alternative B is the most cost-beneficial safety review alternative

  11. Comparison of licensing activities for operating plants designed by Babcock and Wilcox

    International Nuclear Information System (INIS)

    Thoma, J.O.

    1985-01-01

    This report provides a comparison of a number of licensing activities for the operating Babcock and Wilcox (B and W) plants with emphasis on Rancho Seco. The factors selected were a comparison of staff resources expended in FY84, active licensing action reviews, implementation of NUREG-0737 modifications, exemptions to regulations, SALP reports, enforcement actions, and Licensee Event Reports (LERs). The eight licensed operating plants examined are as follows: Arkansas Nuclear One Unit 1 (ANO-1), Crystal River Unit 3, Davis Besse, Oconee Units 1, 2, and 3, Rancho Seco, and Three Mile Island Unit 1 (TMI-1)

  12. Results from a National Study of Social Workers Sanctioned by State Licensing Boards

    Science.gov (United States)

    Boland-Prom, Kim W.

    2009-01-01

    This article presents the results of a descriptive study, synthesizing the reports of 27 state regulatory boards about their actions against certified and licensed social workers (N = 874) during the period of 1999 to 2004. The purpose of this study was to examine the unprofessional behavior of certified and licensed social workers, the results of…

  13. Assuring the Quality of Licensing and Certification Programs.

    Science.gov (United States)

    Shimberg, Benjamin

    When one considers the importance and social significance of licensing and certification examinations, it is amazing that the enterprise operates with virtually no societal oversight. The "Standards for Educational and Psychological Testing" and the "Code of Fair Testing Practices in Education" of the American Psychological…

  14. FOSS License Selection and Code Management

    OpenAIRE

    Vescuso, Peter

    2011-01-01

    With nearly 2,000 free and open source software (FLOSS) licenses, software license proliferation¿ can be a major headache for software development organizations trying to speed development through software component reuse, as well as companies redistributing software packages as components of their products. Scope is one problem: from the Free Beer license to the GPL family of licenses to platform-specific licenses such as Apache and Eclipse, the number and variety of licenses make it difficu...

  15. A study for the review of export license through the NSG denial notification

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Sun Do; Yang, Seung Hyo [Korea Institute of Nuclear Nonproliferation and Control, Daejeon (Korea, Republic of)

    2012-10-15

    All NSG participating members that have rejected applications of export licenses for nuclear export control items within their respective countries must give notice of this to the point of contact at NSG. This is referred to as the Denial Notification, and each of the participating members must respect the denial notifications of the other member nations. When participating members seek to obtain approval for an export license that is essentially identical to the denial notification of other member nations, they must necessarily go through the process of prior discussion with the nation that gave the denial notification. Also, it is regulated that the export license must not be approved without the sufficient exchange of information. Thus, these records of denial notifications must be constantly checked and maintained as the latest updated information and these records must be utilized in related approval examinations. This study analyzes the denial notifications that have been recorded in the past 20 years and it describes the areas that must be mainly examined at the export and import licensing.

  16. Learning-by-Licensing: How Chinese Firms Benefit From Licensing-In Technologies

    DEFF Research Database (Denmark)

    Wang, Yuandi; Roijakkers, N.; Vanhaverbeke, W.

    2012-01-01

    This paper explores how interfirm variations in their in-licensed technology portfolios influence subsequent innovation performance. Existing studies mainly assume licensed technologies are homogeneously accessible to firms, and a prevailing explanation as to why firms vary in their innovation pe...

  17. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  18. The intelligent customer: considerations around build-own-operate business and licensing models for small modular reactors in Canada

    International Nuclear Information System (INIS)

    Jones, K.

    2014-01-01

    An organization planning a proposal for a build-own-operate business model needs to address expanded licensee responsibilities under this model, associated regulatory impacts and how this affects their role as an 'intelligent customer'. This is particularly important for cases where builder-owner-operators plan to manufacture factory-fuelled designs and ship them to a site for installation and operation. The primary responsibility for safe conduct of licensed activities rests with the licensee. A build-own-operate model expands the scope of licensed activities to include design, manufacturing, transport, construction, and operation. The licensee must be able to demonstrate they are qualified to conduct all licensed activities including sufficient competent resources within the licensee's organization to oversee('Intelligent Customer') any work it commissions externally and the subsequent flow down through of the supply chain. This paper examines aspects that organizations need to assess the suitability of approaches that it may take to maintain in-house expertise for the control and oversight of licensed activities at all times. It considers the approach to identification of: core capabilities the licensee would need to understand its safety case under a build-own-operate model to manage licensed activities in accordance with requirements under the Nuclear Safety and Control Acta licensee's 'intelligent customer' capabilities in particular around understanding, specifying, overseeing and accepting work undertaken on its behalf by contractors. While this paper is focused on small modular reactors, being an intelligent customer applies to large commercial or research reactors equally; the size of reactor is immaterial.

  19. The intelligent customer: considerations around build-own-operate business and licensing models for small modular reactors in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Jones, K., E-mail: kenneth.jones@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada)

    2014-07-01

    An organization planning a proposal for a build-own-operate business model needs to address expanded licensee responsibilities under this model, associated regulatory impacts and how this affects their role as an 'intelligent customer'. This is particularly important for cases where builder-owner-operators plan to manufacture factory-fuelled designs and ship them to a site for installation and operation. The primary responsibility for safe conduct of licensed activities rests with the licensee. A build-own-operate model expands the scope of licensed activities to include design, manufacturing, transport, construction, and operation. The licensee must be able to demonstrate they are qualified to conduct all licensed activities including sufficient competent resources within the licensee's organization to oversee('Intelligent Customer') any work it commissions externally and the subsequent flow down through of the supply chain. This paper examines aspects that organizations need to assess the suitability of approaches that it may take to maintain in-house expertise for the control and oversight of licensed activities at all times. It considers the approach to identification of: core capabilities the licensee would need to understand its safety case under a build-own-operate model to manage licensed activities in accordance with requirements under the Nuclear Safety and Control Acta licensee's 'intelligent customer' capabilities in particular around understanding, specifying, overseeing and accepting work undertaken on its behalf by contractors. While this paper is focused on small modular reactors, being an intelligent customer applies to large commercial or research reactors equally; the size of reactor is immaterial.

  20. Nuclear power in Canada : an examination of risks, impacts and sustainability

    International Nuclear Information System (INIS)

    Winfield, M.; Jamison, A.; Wong, R.; Czajkowski, P.

    2006-12-01

    This study examines the environmental impacts of the use of nuclear energy for electricity generation in Canada through each of the four major stages of nuclear energy production: uranium mining and milling; uranium refining, conversion and fuel fabrication; nuclear power plant operation; and waste fuel management. It is intended to inform public debate over the future role of nuclear energy in Canada, and to facilitate comparisons of nuclear energy with other potential energy sources. The study examines waste generation, atmospheric releases, impacts on water quality and water use, and landscape and ecosystem impacts of nuclear energy production. It also examines the occupational and community health impacts of nuclear power and key long-term challenges to its sustainability, including security and weapons proliferation risks. Specific environmental impacts are examined in the context of CANDU nuclear technology, the only reactor type currently in use in Canada. The study findings likely underestimate the overall impacts of the use of nuclear energy for electricity production in Canada. This is a result of significant gaps in the publicly available information on releases of pollutants and contaminants, as well as on the fate of certain waste streams related to the nuclear industry. In addition, the study relies on what are likely conservative estimates in a number of key areas, particularly with respect to the generation of greenhouse gas (GHG) emissions.

  1. Nuclear power in Canada : an examination of risks, impacts and sustainability

    Energy Technology Data Exchange (ETDEWEB)

    Winfield, M.; Jamison, A.; Wong, R.; Czajkowski, P.

    2006-12-15

    This study examines the environmental impacts of the use of nuclear energy for electricity generation in Canada through each of the four major stages of nuclear energy production: uranium mining and milling; uranium refining, conversion and fuel fabrication; nuclear power plant operation; and waste fuel management. It is intended to inform public debate over the future role of nuclear energy in Canada, and to facilitate comparisons of nuclear energy with other potential energy sources. The study examines waste generation, atmospheric releases, impacts on water quality and water use, and landscape and ecosystem impacts of nuclear energy production. It also examines the occupational and community health impacts of nuclear power and key long-term challenges to its sustainability, including security and weapons proliferation risks. Specific environmental impacts are examined in the context of CANDU nuclear technology, the only reactor type currently in use in Canada. The study findings likely underestimate the overall impacts of the use of nuclear energy for electricity production in Canada. This is a result of significant gaps in the publicly available information on releases of pollutants and contaminants, as well as on the fate of certain waste streams related to the nuclear industry. In addition, the study relies on what are likely conservative estimates in a number of key areas, particularly with respect to the generation of greenhouse gas (GHG) emissions.

  2. Legal protection of citizens in licensing procedures for large-scale industrial installations

    International Nuclear Information System (INIS)

    Class, T.

    1990-01-01

    The author examines whether the Constitution and the various procedural provisions do indeed guarantee full effect to the principle of participation of citizens in the licensing procedure, as e.g. by a sufficient formulation and definition of rights. The role of the Constitution is discussed in regard to the formulation of procedural provisions and rights of parties participating in the licensing procedure. (RST) [de

  3. Workplace Violence and Job Outcomes of Newly Licensed Nurses.

    Science.gov (United States)

    Chang, Hyoung Eun; Cho, Sung-Hyun

    2016-12-01

    The purpose of this study was to examine the prevalence of workplace violence toward newly licensed nurses and the relationship between workplace violence and job outcomes. An online survey was conducted of newly licensed registered nurses who had obtained their license in 2012 or 2013 in South Korea and had been working for 5-12 months after first being employed. The sample consisted of 312 nurses working in hospitals or clinics. The Copenhagen Psychosocial Questionnaire II was used to measure violence and nurse job outcomes. Multiple linear and logistic regression analyses were conducted to examine the relationship between violence and job outcomes. Verbal abuse was most prevalent (59.6%), followed by threats of violence (36.9%), physical violence (27.6%), bullying (25.6%), and sexual harassment (22.4%). Approximately three quarters of the nurses had experienced at least one type of violence. The main perpetrators were patients and nurse colleagues, although the distribution of perpetrators varied depending on the type of violence. Bullying had a significant relationship with all four job outcomes (job satisfaction, burnout, commitment to the workplace, and intent to leave), while verbal abuse was associated with all job outcomes except for intent to leave. Violence perpetrated by nurse colleagues had a significant relationship with all four job outcomes, while violence by physicians had a significant inverse relationship with job satisfaction. Workplace violence is experienced by a high percentage of newly licensed nurses, and is associated with their job outcomes. Copyright © 2016. Published by Elsevier B.V.

  4. Trends in nuclear licensing

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, N W [Council for Nuclear Safety, Hennopsmeer, Pretoria (South Africa)

    1990-06-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  5. Trends in nuclear licensing

    International Nuclear Information System (INIS)

    Dalton, N.W.

    1990-01-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  6. Decommissioning and decontamination of licensed reactor facilities and demonstration nuclear power plants

    International Nuclear Information System (INIS)

    Lear, G.; Erickson, P.B.

    1975-01-01

    Decommissioning of licensed reactors and demonstration nuclear power plants has been accomplished by mothballing (protective storage), entombment, and dismantling or a combination of these three. The alternative selected by a licensee seems to be primarily based on cost. A licensee must, however, show that the decommissioning process provides adequate protection of the health and safety of the public and no adverse impact on the environment. To date the NRC has approved each of the alternatives in the decommissioning of different facilities. The decommissioning of small research reactors has been accomplished primarily by dismantling. Licensed nuclear power plants, however, have been decommissioned primarily by being placed in a mothballed state in which they continue to retain a reactor license and the associated licensee responsibilities

  7. Status report on the HFR conversion and re-licensing project

    International Nuclear Information System (INIS)

    Wijtsma, F.G.

    2003-01-01

    In 1999 the HFR license holder (JRC, Petten, the Netherlands) initiated a project to study the conversion of the HFR from HEU to LEU. The first phase of this project consisted of a parametric study to determine the optimum fuel element and control rod design within given boundary conditions such as geometry, density, performance and cycle length. Results of this study are a 22 plates fuel element (550 g 235 U) at a density of 4.8 g.cm -3 and a 17 plates control rod (440 g 235 U). The second phase contains all aspects related to the conversion including a full-scale test irradiation of a prototype LEU element. The actual conversion of the HFR requires a new license. For this reason the re-licensing project has started in 2001. In this context many studies have been performed e.g. Risk Scoping Study, Safety Analyses, TOPA (Technical, Operational, Personnel and Administrative) evaluation. The license application will be based on a new Safety Report and an Environmental Impact Statement and will be submitted to the competent Authorities at the end of October 2003. (author)

  8. 47 CFR 13.209 - Examination procedures.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Examination procedures. 13.209 Section 13.209 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS Examination System § 13.209 Examination procedures. (a) Each examination for a commercial radio operator license must be administered at a...

  9. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  10. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  11. Licensing activities for the partial decommissioning of IRT-2000 research reactor in Sofia

    International Nuclear Information System (INIS)

    Apostolov, T.; Ilieva, Kr.; Papukchiev, A.; Kalchev, B.

    2001-01-01

    The project for refurbishment of IRT-2000 research reactor in Sofia into low-power reactor (200 kW) is based on the retention of some IRT-2000 buildings, facilities and equipment. The activities, which determine the partial decommissioning should be realized in accordance with preliminary developed licensing documents as General Plan, Safety Analysis Report and Environment Impact assessment Report. The goal of these documents is to provide and guarantee safe and effective activities with radioactive materials, to define strictly the dismantling procedures, and in the same time to minimize their influence on the environment. The Technical Tasks for General Plan, Safety Analysis Report and Environment Impact Assessment Report have been prepared and will be presented as preliminary licensing documents to the National Regulatory Body for approval before their application. A Quality Management system is being developed nowadays at INRNE. After its certification some requirements of the regulatory body will be completed. This certified QA system is a major part of the licensing procedure for the reconstruction of IRT-2000 research reactor. (author)

  12. Aging baby boomers--a blessing or challenge for driver licensing authorities.

    Science.gov (United States)

    Dobbs, Bonnie M

    2008-08-01

    In less than 5 years, the first wave of baby boomers will begin turning 65, with the last wave of boomers entering their senior years in January 2029. Currently, boomers make up a significant percentage of the population in Canada, the United States, and other developed countries. The baby boom generation has had a profound impact on our society over the last six decades, and this large cohort will continue to exert its influence for several decades to come. Central to this article is the rapid growth in the number of persons 65 years of age and older, beginning in 2011, with a corresponding increase in the number of older drivers. The demographic shift has important implications for licensing authorities, the regulatory bodies charged with licensing and 'fitness to drive' decisions. The objectives of this paper are to summarize the published scientific literature on licensing policies and procedures currently in use for older drivers, discuss their limitations, and provide recommendations for meeting the upcoming challenges of an aging baby boomer population of drivers. Online searches were conducted using the following databases: PsycINFO, MEDLINE, Scopus, and TRIS. Google and Google Scholar also were searched for scientific articles. References identified from database and online searches were examined for relevant articles. A number of studies have investigated the utility of different licensing policies and procedures for identifying older drivers who may be at risk for impaired driving performance. Overall, results suggest that current policies and procedures are ineffective in identifying high-risk older drivers. The results also emphasize the need for a different approach for the identification of high risk older drivers by licensing agencies. Recommendations to assist with that goal are provided. The aging of the baby boomer population, combined with the projected high crash rates for this cohort of drivers as it moves through the senior years, underscores

  13. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  14. Establishing a safety and licensing basis for generation IV advanced reactors. License by test

    International Nuclear Information System (INIS)

    Kadak, Andrew C.

    2001-01-01

    The license by test approach to licensing is a novel method of licensing reactors. It provides an opportunity to deal with innovative non-water reactors in a direct way on a time scale that could permit early certification based on tests of a demonstration reactor. The uncertainties in the design and significant contributors to risk would be identified in the PRA during the design. Deterministic analysis computer codes could be tested on a real reactor. Scaling effects and associated uncertainties would be minimized. License by test is an approach that has sufficient merit to be developed and tested

  15. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  16. Examining the impact of modality and learning style preferences on recall of psychiatric nursing and pharmacology terms.

    Science.gov (United States)

    Wieland, Patience S; Willis, Jana; Peters, Michelle L; O'Toole, Robin S

    2018-07-01

    The purpose of this experimental research study was to explore how modality and learning style preferences impact non-prescribing, first-year Licensed Vocational Nurse (LVN) students' recall of vocabulary. Independent t-test results indicated a statistically significant mean difference in short-term recall of pharmacological and psychiatric terms, with learners receiving visual text instruction recalling significantly more vocabulary than learners receiving audio text instruction. A correlation was not found between learning preferences and vocabulary recall. Copyright © 2018 Elsevier Ltd. All rights reserved.

  17. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  18. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  19. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  20. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  1. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  2. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  3. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  4. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  5. Impact of 2D/3D-project on LOCA-licensing analysis and reactor safety of PWRs

    International Nuclear Information System (INIS)

    Winkler, F.; Krebs, W.D.

    1989-01-01

    In the past LOCA-licensing analysis has included large conservatisms to compensate for the lack of detailed two phase flow and full scale experimental data. The 2D/3D-project was established to improve the data base in order to minimize the conservatisms required. The significant results and findings of the full scale Upper Plenum Test Facility (UPTF) and from the electrically heated Slab Core Test Facility (SCTF) were particularly useful for understanding the multidimensional phenomena in the primary system and in the core of a PWR. UPTF results were used to verify the TRAC-PF1 analysis of a PWR with combined ECC-Injection during the reflood phase of a large break-LOCA. Comparison of these results with results from classic licensing calculations quantifies the large safety margin in earlier licensing procedures and in reactor systems. (orig.)

  6. Medical review practices for driver licensing volume 2: case studies of medical referrals and licensing outcomes in Maine, Ohio, Oregon, Texas, Washington, and Wisconsin.

    Science.gov (United States)

    2017-03-01

    This is the second of three reports examining driver medical review practices in the United States and how : they fulfill the basic functions of identifying, assessing, and rendering licensing decisions on medically at-risk : drivers. This volume pre...

  7. Licensing in an International Market

    Science.gov (United States)

    Ferreira, Fernanda A.

    2008-09-01

    We study the effects of entry of a foreign firm on domestic welfare in the presence of licensing, when the entrant is technologically superior to the incumbent. We show that foreign entry increases domestic welfare for sufficiently large technological differences between the firms under both fixed-fee licensing and royalty licensing.

  8. 22 CFR 120.20 - License.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false License. 120.20 Section 120.20 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.20 License. License means a document bearing the word “license” issued by the Directorate of Defense Trade...

  9. M5TM alloy high burnup behavior and worldwide licensing

    International Nuclear Information System (INIS)

    Mardon, J.P.; Hoffmann, P.B.; Garner, G.L.

    2005-01-01

    The in-reactor behavior of advanced PWR Zirconium alloys at burnups equal to or below licensing limits has been widely reported. Specifically, the advanced alloy M5 has demonstrated impressive improvements over Zircaloy-4 for fuel rod cladding and fuel assembly structural components. To demonstrate superiority of the alloy at burnups beyond current licensing limits, M5 has been operated in PWR at burnups exceeding 71 GWd/tU in the United States and 78 GWd/tU in Europe. Two extensive irradiation programs have been performed in the United States to demonstrate alloy M5 performance beyond current licensing limits. Four M5 TM fuel rods were exposed to four 24-month cycles in a 15x15 reactor beginning in 1995. Additionally, one 17x17 lead assembly containing M5 fuel rods and guide tubes was operated for four 18-month cycles beginning from 1997. Post-irradiation examinations (PIE) performed after all four cycles in the 15x15 demonstration program revealed excellent performance in the licensed burnup and in the high burnup stages of the experience. Examination of the 4th cycle 17x17 assembly will be accomplished in two stages the first of which is scheduled for June 2005. Moreover, several irradiation campaigns have been performed in Europe in order to confirm the excellent M5 in-pile behavior in demanding PWRs irradiation conditions with regard to void fraction, heat flux, lithium content and temperature. Results from the high burnup fuel examinations verify that the excellent performance achieved up to 62 GWd/tU was continued into higher burnup. The results of high burnup PIE campaigns for European and American PWR's are presented in this paper. Measured performance indicators include fuel assembly dimensional stability parameters (assembly length, fuel rod length, assembly bow, fuel rod bow, fuel rod radial creep and spacer grid width), oxidation measurements (fuel rod and guide tube) and hydrogen pick-up data (fuel rod). In the framework of PCI studies, power ramp

  10. 48 CFR 227.7203-4 - License rights.

    Science.gov (United States)

    2010-10-01

    ... Software and Computer Software Documentation 227.7203-4 License rights. (a) Grant of license. The... license, under an irrevocable license granted or obtained by the contractor which developed the software... granted to the Government. The scope of a computer software license is generally determined by the source...

  11. Licensing process characteristics of Small Modular Reactors and spent nuclear fuel repository

    Energy Technology Data Exchange (ETDEWEB)

    Söderholm, Kristiina, E-mail: kristiina.soderholm@fortum.com [Fortum Power (Finland); Tuunanen, Jari, E-mail: jari.tuunanen@fortum.com [Fortum Power (Finland); Amaba, Ben, E-mail: baamaba@us.ibm.com [IBM Complex Systems (United States); Bergqvist, Sofia, E-mail: sofia.bergqvist@se.ibm.com [IBM Rational Software (Sweden); Lusardi, Paul, E-mail: plusardi@nuscalepower.com [NuScale Power (United States)

    2014-09-15

    Highlights: • We examine the licensing process challenges of modular nuclear facilities. • We compare the features of Small Modular Reactors and spent nuclear fuel repository. • We present the need of nuclear licensing simplification. • Part of the licensing is proposed to be internationally applicable. • Systems engineering and requirements engineering benefits are presented. - Abstract: This paper aims to increase the understanding of the licensing processes characteristics of Small Modular Reactors (SMR) compared with licensing of spent nuclear fuel repository. The basis of the SMR licensing process development lies in licensing processes used in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their various licensing processes and recent actions in the new NPP construction. Certain aspects of the aviation industry licensing process have also been studied and selected practices have been investigated as possibly suitable for use in nuclear licensing. Suitable features for SMR licensing are emphasized and suggested. The licensing features of the spent nuclear fuel deep repository along with similar features of SMR licensing are discussed. Since there are similar types of challenges of lengthy licensing time frames, as well as modular features to be taken into account in licensing, these two different nuclear industry fields can be compared. The main SMR features to take into account in licensing are: • Standardization of the design. • Modularity. • Mass production. • Serial construction. Modularity can be divided into two different categories: the first category is simply a single power plant unit constructed of independently engineered modules (e.g. construction process for Westinghouse AP-1000 NPP) and the second one a power plant composed of many reactor modules, which are manufactured in factories and installed as needed (e.g. NuScale Power SMR design). The deep underground repository

  12. Ebooks Licensing and Canadian Copyright Legislation: A Few Considerations

    Directory of Open Access Journals (Sweden)

    Tony G Horava

    2009-06-01

    Full Text Available Ebooks have become increasingly common in collection development strategies. The availability and delivery of monographs in digital formats has gained significantly in popularity in many libraries, particularly in the academic sector. Licensing is the common method of acquiring ebooks, whether as a subscription or a purchase. Libraries have had to transform selection and workflow processes in order to acquire ebooks in an efficient manner. Little attention, however, has been paid to the interplay between licensing as a contractual arrangement and the statutory rights available under Canadian copyright law. Fair dealing is a concept of critical importance in Canadian copyright, as it provides the foundation for user rights in support of culture, learning, and innovation. There are other provisions of specific value for libraries, such as interlibrary loans and access by persons with perceptual disabilities. This article will examine these issues and proposes a few strategies that libraries can adopt to ensure that statutory rights are not eroded in licensing agreements

  13. Current status of construction license of PEFP

    International Nuclear Information System (INIS)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T.

    2012-01-01

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically

  14. Current status of construction license of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically.

  15. Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    acquisition. The findings indicate that technology licensing is positively related to the number of inventions produced by the licensee in the years subsequent to the licensing deal. Subsequently, I investigate the moderating effect that organizational slack and myopia have on this main relationship....... The findings also suggest that high levels of Organizational Slack (available financial resources) strengthen the positive effect of licensing on innovation. However, higher levels of Organizational Myopia (the extent to which a firm draws on its own knowledge) can decrease the main effect of licensing....

  16. 31 CFR 596.309 - Specific license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.309 Specific license. The term specific license means any license or...

  17. The Impact of the Newly Licensed Dengue Vaccine in Endemic Countries.

    OpenAIRE

    Maíra Aguiar; Nico Stollenwerk; Scott B Halstead

    2016-01-01

    Background With approximately 3 billion people at risk of acquiring the infection, dengue fever is now considered the most important mosquito-borne viral disease in the world, with 390 million dengue infections occurring every year, of which 96 million manifest symptoms with any level of disease severity. Treatment of uncomplicated dengue cases is only supportive and severe dengue cases require hospital intensive care. A vaccine now licensed in several countries and developed by Sanofi Pasteu...

  18. Relevant aspects in licensing of radioactive installations at petroleum and gas well logging

    International Nuclear Information System (INIS)

    Miranda, Marcia Valeria da E. Sa

    2002-01-01

    The importance of the various factors considered during the process of licensing of radioactive installation for petroleum and gas well logging. This process involves the issuing of some public power acts, the co called Administrative Acts. For the radioactive installations the Administrative Acts are related to the Norm CNEN-NE-6.02 'Licensing of Radioactive Installation'. In the conduction of the licensing of radioactive installation of mobile nuclear measurement devices the safety evaluation of radioactive installation and equipment containing incorporated radiation source are included; certification of radioprotection supervisors; programing and evaluation of the radioprotection inspections; and the conduction of conformal inspection according to the project, safety analysis and audits. An evaluation of the impact of the importance grade attributed to each factor in the optimization of licensing process is related. Finally, the prediction of implantation of a control system for the displacement of radioactive sources in the installation is approached comprehending the up-to-date localization of each source at different work front of the Basis

  19. Perceptions, intentions and behavioral norms that affect pre-license driving among Arab youth in Israel.

    Science.gov (United States)

    Gesser-Edelsburg, Anat; Zemach, Mina; Lotan, Tsippy; Elias, Wafa; Grimberg, Einat

    2018-02-01

    The present study examines reported pre-license driving among youth from the population of Arab citizens of Israel. The purpose of the present study is to examine which sociodemographic variables, attitudes and perceptions about safe driving and individual and societal behavioral norms are associated with pre-license driving. The research distinguished between the factors that actually contribute to pre-license driving (reported behavior, peer norms, gender and parents' messages) and the factors that explain the intention (parental authority, social norms, parents' messages and fear of road crashes). Even though there was a significant partial overlap (84%) between those who intend to drive without a license and those who reported driving without a license, the main factors that distinguish pre-license driving groups are different from the factors that distinguish the intention to drive before receiving a license. What is unique about the findings is the identification of the context in which social norms are influential and that in which parental authority is influential. The study indicated that in the case of pre-license driving, the main motivating factor is subjective norms, whereas in the case of expecting to drive without a license, the main motivating factor is the interaction between parental authority and the messages that parents convey. While actual behavior pertains to the behavioral level, we argue that intended behavior pertains to the cognitive level. At this level, rational considerations arise, such as fear of parental punishment and fear of accidents. These considerations compete with the influence of friends and their norms, and may outweigh them. The findings suggest that it is important to safeguard youth against the influence of peer pressure as early as the stage of behavioral intentions. Follow-up studies can simulate situations of pre-license driving due to social pressure and identify the factors that might affect young people's decision

  20. Online driver's license renewal.

    Science.gov (United States)

    2015-09-01

    The Kentucky Department of Vehicle Regulation is exploring the possibility of developing and implementing online : drivers license renewal. The objective of this project was to: 1) evaluate online drivers license and REAL ID renewal : programs ...

  1. The need for legislative framework (licensing)

    International Nuclear Information System (INIS)

    Krech, H.

    1977-01-01

    For reasons of public acceptance the basis of a licensing system should be laid down in a law, details can be fixed in regulations below the law-level. The competence for licensing nuclear installations should be attributed to one body, which is not a the same time charged with the promotion of nuclear energy. The licensing authority has to be provided with sufficient technical advice, given by experts organized in advisory bodies. Normally a licensing procedure is split into several steps (site approval, construction permit, operation licence), each step can be subdivided. Some general aspects of licensing conditions (personal, technical and financial) as well as of the licensing procedure are outlined. The participation of the public is of particular importance but also involves most intricate problems. The paper concludes with some critical remarks on the role of administrative courts with respect to the licensing of nuclear power plants. (orig.) [de

  2. 31 CFR 596.305 - General license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.305 General license. The term general license means any license or authorization...

  3. Tast Force report on bonding and perpetual care of nuclear licensed activities

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Potential issues which should be considered prior to the adoption and implementation of a bonding or perpetual care program are examined. The following topics are discussed: problem definition; major processors; factors in setting the amount of a bond; waste handling licensees; ore refineries and mills; former AEC licensed facilities; other specific licenses; authority; states where it is deemed that amendment of existing statutes is necessary to authorize imposition of a bonding requirement for licenses; administration; and recommendations. The following appendices are included: summary of cost estimate to decontaminate the American Nuclear Company; report on 1974 national conference on radiation control workshop no. 3; suggested changes to state regulations; and suggested legislation for licensee bonding and perpetual care trust funds

  4. Why trash don't pass? pharmaceutical licensing and safety performance of drugs.

    Science.gov (United States)

    Banerjee, Tannista; Nayak, Arnab

    2017-01-01

    This paper examines how asymmetric information in pharmaceutical licensing affects the safety standards of licensed drugs. Pharmaceutical companies often license potential drug molecules at different stages of drug development from other pharmaceutical or biotechnology companies and complete the remaining of research stages before submitting the new drug application(NDA) to the food and drug administration. The asymmetric information associated with the quality of licensed molecules might result in the molecules which are less likely to succeed to be licensed out, while those with greater potential of success being held internally for development. We identify the NDAs submitted between 1993 and 2004 where new molecular entities were acquired through licensing. Controlling for other drug area specific and applicant firm specific factors, we investigate whether drugs developed with licensed molecules face higher probability of safety based recall and ultimate withdrawal from the market than drugs developed internally. Results suggest the opposite of Akerlof's (Q J Econ 84:488-500, 1970) lemons problem. Licensed molecules rather have less probability of facing safety based recalls and ultimate withdrawal from the market comparing to internally developed drug molecules. This suggests that biotechnology and small pharmaceutical firms specializing in pharmaceutical research are more efficient in developing good potential molecules because of their concentrated research. Biotechnology firms license out good potential molecules because it increases their market value and reputation. In addition, results suggest that both the number of previous approved drugs in the disease area, and also the applicant firms' total number of previous approvals in all disease areas reduce the probability that an additional approved drug in the same drug area will potentially be harmful.

  5. Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  6. EMPIRICAL STUDY OF CAR LICENSE PLATES RECOGNITION

    Directory of Open Access Journals (Sweden)

    Nasa Zata Dina

    2015-01-01

    Full Text Available The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms have been proposed by many researchers. License plate recognition requires license plate detection, segmentation, and charac-ters recognition. The algorithm detects the position of a license plate and extracts the characters. Various license plate recognition algorithms have been implemented, and each algorithm has its strengths and weaknesses. In this research, I implement three algorithms for detecting license plates, three algorithms for segmenting license plates, and two algorithms for recognizing license plate characters. I evaluate each of these algorithms on the same two datasets, one from Greece and one from Thailand. For detecting li-cense plates, the best result is obtained by a Haar cascade algorithm. After the best result of license plate detection is obtained, for the segmentation part a Laplacian based method has the highest accuracy. Last, the license plate recognition experiment shows that a neural network has better accuracy than other algo-rithm. I summarize and analyze the overall performance of each method for comparison.

  7. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  8. Alpena Community College Commercial Driver's License Program. Evaluation Summary.

    Science.gov (United States)

    Alpena Community Coll., MI.

    The Alpena Community College (ACC) Drivers Education Program was developed to deliver a basic skills program providing specific job-related basic skills instruction to approximately 300 workers throughout Michigan who desired to pass the Commercial Drivers License (CDL) examination. Other program goals were to establish greater partnerships…

  9. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Rønde, Thomas; Fosfuri, Andrea

    the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend upon product market performance. If licensing is decentralized, the business unit forgoes valuable...... licensing opportunities since the rewards for licensing are (optimally) weaker than those for product market profits. This distortion is stronger when production-based incentives are more powerful, making centralization more attractive. Growth of technology markets favors centralization and drives higher...

  10. PWR reactor pressure vessel internals license renewal industry report; revision 1. Final report

    International Nuclear Information System (INIS)

    Schwirian, R.; Robison, G.

    1994-07-01

    The U.S. nuclear power industry, through coordination by the Nuclear Management and Resources Council (NUMARC), and sponsorship by the U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), has evaluated age-related degradation effects for a number of major plant systems, structures and components, in the license renewal technical Industry Reports (IRs). License renewal applicants may choose to reference these IRs in support of their plant-specific license renewal applications, as an equivalent to the integrated plant assessment provisions of the license renewal rule (10 CFR Part 54). Pressurized water reactor (PWR) reactor pressure vessel (RPV) internals designed by all three U.S. PWR nuclear steam supply system vendors have been evaluated relative to the effects of age-related degradation mechanisms; the capability of current design limits; inservice examination, testing, repair, refurbishment, and other programs to manage these effects; and the assurance that these internals can continue to perform their intended safety functions in the license renewal term. This industry report (IR), one of a series of ten, provides a generic technical basis for evaluation of PWR reactor pressure vessel internals for license renewal

  11. The Automated System for Identification of License Plates of Cars

    Directory of Open Access Journals (Sweden)

    FRATAVCHAN, V.

    2008-04-01

    Full Text Available The paper focuses on the automated traffic rule control system. It examines the basic scheme of the system, basic constituents, principles of constituent interactions, search methods of moving objects, localization, and identification of the license plate.

  12. Department of Energy licensing strategy

    International Nuclear Information System (INIS)

    Frei, M.W.

    1984-01-01

    The Department of Energy (DOE) is authorized by the Nuclear Waste Policy Act of 1982 (Act) to site, design, construct, and operate mined geologic repositories for high-level radioactive wastes and is required to obtain licenses from the Nuclear Regulatory Commission (NRC) to achieve that mandate. To this end the DOE has developed a licensing approach which defines program strategies and which will facilitate and ease the licensing process. This paper will discuss the regulatory framework within which the repository program is conducted, the DOE licensing strategy, and the interactions between DOE and NRC in implementing the strategy. A licensing strategy is made necessary by the unique technical nature of the repository. Such a facility has never before been licensed; furthermore, the duration of isolation of waste demanded by the proposed EPA standard will require a degree of reliance on probabilistic performance assessment as proof of compliance that is a first of a kind for any industry. The licensing strategy is also made necessary by the complex interrelationships among the many involved governmental agencies and even within DOE itself, and because these relationships will change with time. Program activities which recognize these relationships are essential for implementing the Act. The guiding principle in this strategy is an overriding commitment to safeguarding public health and safety and to protecting the environment

  13. Relationship between licensing, registration, and other gun sales laws and the source state of crime guns.

    Science.gov (United States)

    Webster, D W; Vernick, J S; Hepburn, L M

    2001-09-01

    To determine the association between licensing and registration of firearm sales and an indicator of gun availability to criminals. Tracing data on all crime guns recovered in 25 cities in the United States were used to estimate the relationship between state gun law categories and the proportion of crime guns first sold by in-state gun dealers. In cities located in states with both mandatory registration and licensing systems (five cities), a mean of 33.7% of crime guns were first sold by in-state gun dealers, compared with 72.7% in cities that had either registration or licensing but not both (seven cities), and 84.2% in cities without registration or licensing (13 cites). Little of the difference between cities with both licensing and registration and cities with neither licensing nor registration was explained by potential confounders. The share of the population near a city that resides in a neighboring state without licensing or registration laws was negatively associated with the outcome. States with registration and licensing systems appear to do a better job than other states of keeping guns initially sold within the state from being recovered in crimes. Proximity to states without these laws, however, may limit their impact.

  14. Application of up-front licensing

    Energy Technology Data Exchange (ETDEWEB)

    Grant, S D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada); Snell, V G [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    AECL has been pioneering `up-front` licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs.

  15. Application of up-front licensing

    International Nuclear Information System (INIS)

    Grant, S.D.; Snell, V.G.

    1995-01-01

    AECL has been pioneering 'up-front' licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs

  16. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  17. License renewal in the United States

    International Nuclear Information System (INIS)

    Brons, Jack

    2002-01-01

    Full text: Nuclear plants in the United States are licensed for 40 years, a length specified in the Atomic Energy Act of 1954, which laid out much of the regulatory basis for the commercial nuclear industry. The Act, however, made provision for license renewal. The original 40-year license period was chosen arbitrarily by the U.S. Congress because it was the typical period over which utilities recovered their investment in electricity generating plants. Nuclear plants, however, are subject to a rigorous program of Nuclear Regulatory Commission oversight, maintenance and equipment replacement. In effect, they must be in the same operating condition on the last day of their licenses as they were on the first. As the industry matured, it became apparent that there was no physical limitation on the continued operation of nuclear plants past 40 years. The industry turned its attention toward license renewal. When the issue was first raised, the NRC considered stringent process equivalent to seeking a new operating license for each plant. The complexity, length and cost of the process made it unlikely that many nuclear plants would seek license renewal. The nuclear industry worked successfully with NRC on the application of generic principles to license renewal, however, and in 1995, the NRC issued an efficient, tightly-focused rule that made license renewal a safe, viable option. To extend the operating license for a reactor, a company must demonstrate to the NRC that aging effects will be adequately managed during the renewal terms, thus ensuring equipment functionality. The rule allows licensees to apply for extensions of up to 20 years. The first license renewal application was filed in 1998 by the owner of the two-unit Calvert Cliffs plant. Shortly thereafter, an application was filed for the three-unit Oconee Nuclear Station. The NRC renewed the licenses for all five units in 2000, and since then, five more licenses have been renewed. The NRC has received 37

  18. NPP long term operation in Spain - First application for license renewal

    International Nuclear Information System (INIS)

    Francia, L.; Gorrochategui, I.; Marcos, R.

    2007-01-01

    Full text: In the operation of the Spanish nuclear power plants (NPP), safety is always the prime consideration. Plant Life Management Programmes have been set up with the strategic objective to operate the NPPs as long as they are considered safe and reliable. The safety of each NPP is reviewed by the Spanish nuclear regulatory authority (CSN) under a continuous process. In addition, experience is gained from operating the plants and from exchanges with operators of similar units. Current Spanish regulatory framework for renewing NPP operating licenses requires performing a Periodic Safety Review (PSR) to be performed every 10 years and submitted when applying for a new renewal of the NPP operating license. A few years ago, CSN issued a document regarding the licensing requirements that nuclear power plants should meet in order to be granted with an operating license for long term operation (i.e, operation beyond the original plant design life, typically 40 years). Besides the traditional PSR requirements, specific requirements regarding to long term operation (LTO) include: - An Aging Management and Evaluation Program, including the identification and evaluation of Time Limited Aging Analysis (TLAA). - An updated Radiological Impact Study. - A review and assessment of regulation/standard applicability. Garona NPP (GE, BWR/3 design) operated by Spanish utility Nuclenor from 1971 has a current operating license up to 2009. A decision was made to apply for a new operating license, being Garona plant the first one in Spain to face with the new long term operation requirements. The paper will provide an overview of the methodology used in Spain to address and perform the required analyses to support the LTO application for the operating license renewal. In particular, focus will be paid on the project developed in Garona (2002-2006) whose result has been the first Spanish application for License Renewal for LTO. Also it will be reported the ongoing work necessary to

  19. Mentoring for Inclusion: The Impact of Mentoring on Undergraduate Researchers in the Sciences.

    Science.gov (United States)

    Haeger, Heather; Fresquez, Carla

    Increasing inclusion of underrepresented minority and first-generation students in mentored research experiences both increases diversity in the life sciences research community and prepares students for successful careers in these fields. However, analyses of the impact of mentoring approaches on specific student gains are limited. This study addresses the impact of mentoring strategies within research experiences on broadening access to the life sciences by examining both how these experiences impacted student success and how the quality of mentorship affected the development of research and academic skills for a diverse population of students at a public, minority-serving institution. Institutional data on student grades and graduation rates (n = 348) along with postresearch experience surveys (n = 138) found that students mentored in research had significantly higher cumulative grade point averages and similar graduation rates as a matched set of peers. Examination of the relationships between student-reported gains and mentoring strategies demonstrated that socioemotional and culturally relevant mentoring impacted student development during mentored research experiences. Additionally, extended engagement in research yielded significantly higher development of research-related skills and level of independence in research. Recommendations are provided for using mentoring to support traditionally underrepresented students in the sciences. © 2016 H. Haeger and C. Fresquez. CBE—Life Sciences Education © 2016 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  20. 76 FR 13973 - United States Warehouse Act; Processed Agricultural Products Licensing Agreement

    Science.gov (United States)

    2011-03-15

    ... security of goods in the care and custody of the licensee. The personnel conducting the examinations will..., Warehouse Operations Program Manager, FSA, United States Department of Agriculture, Mail Stop 0553, 1400... continuing compliance with the standards of approval and operation. FSA will conduct examinations of licensed...

  1. Technical Barriers, Licenses and Tariffs as Means of Limiting Market Access

    DEFF Research Database (Denmark)

    Schröder, Philipp J.H.; Jørgensen, Jan Guldager

    2006-01-01

    Technical barriers (standards), import licenses and tariffs may be deployed as means of limiting the market access of foreign firms. The present paper examines these measures in a setting of monopolistic competition. We find that, if protection focuses predominantly on the number of foreign firms...... accessing the domestic market, a technical barrier (an import license) may dominate a tariff (tariff and a tech- nical barrier) in terms of consumer welfare, even when tariff revenues are fully redistributed. However, if protection pays su±cient focus on limiting the total import volume, then tariffs...

  2. An Examination of the Impact of Learning Communities on Job

    Science.gov (United States)

    Wilmes, David M.

    2012-01-01

    The purpose of this study was to examine the relationship between learning community participation and job/major congruence. Previous research has demonstrated that learning communities are effective vehicles for promoting student and institutional outcomes. However, few studies have examined the impact of learning communities on alumni or career…

  3. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  4. Impacts of licensed premises trading hour policies on alcohol-related harms.

    Science.gov (United States)

    Atkinson, Jo-An; Prodan, Ante; Livingston, Michael; Knowles, Dylan; O'Donnell, Eloise; Room, Robin; Indig, Devon; Page, Andrew; McDonnell, Geoff; Wiggers, John

    2018-07-01

    Evaluations of alcohol policy changes demonstrate that restriction of trading hours of both 'on'- and 'off'-licence venues can be an effective means of reducing rates of alcohol-related harm. Despite this, the effects of different trading hour policy options over time, accounting for different contexts and demographic characteristics, and the common co-occurrence of other harm reduction strategies in trading hour policy initiatives, are difficult to estimate. The aim of this study was to use dynamic simulation modelling to compare estimated impacts over time of a range of trading hour policy options on various indicators of acute alcohol-related harm. An agent-based model of alcohol consumption in New South Wales, Australia was developed using existing research evidence, analysis of available data and a structured approach to incorporating expert opinion. Five policy scenarios were simulated, including restrictions to trading hours of on-licence venues and extensions to trading hours of bottle shops. The impact of the scenarios on four measures of alcohol-related harm were considered: total acute harms, alcohol-related violence, emergency department (ED) presentations and hospitalizations. Simulation of a 3 a.m. (rather than 5 a.m.) closing time resulted in an estimated 12.3 ± 2.4% reduction in total acute alcohol-related harms, a 7.9 ± 0.8% reduction in violence, an 11.9 ± 2.1% reduction in ED presentations and a 9.5 ± 1.8% reduction in hospitalizations. Further reductions were achieved simulating a 1 a.m. closing time, including a 17.5 ± 1.1% reduction in alcohol-related violence. Simulated extensions to bottle shop trading hours resulted in increases in rates of all four measures of harm, although most of the effects came from increasing operating hours from 10 p.m. to 11 p.m. An agent-based simulation model suggests that restricting trading hours of licensed venues reduces rates of alcohol-related harm and extending trading hours of bottle

  5. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    OpenAIRE

    Marco Ciurcina

    2017-01-01

    This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  6. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Fosfuri, Andrea; Rønde, Thomas

    2013-01-01

    , we find that interdependency across business units may result in more, not less, decentralization. Furthermore, even though centralization results in less information, centralized licensing deals are larger. Our model conforms to the existing evidence that reports heterogeneity across firms in both......Technology licensing is an important means for companies to extract more value from their intellectual assets. We build a model that helps understand how licensing activity should be organized within large corporations. More specifically, we compare decentralization—where the business unit using...... the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend on product market performance. If licensing is decentralized, the business unit forgoes valuable...

  7. International vs. domestic technology in-licensing: How do Chinese firms build their technological capabilities?

    DEFF Research Database (Denmark)

    Li, Ying; Wang, Yuandi

    2011-01-01

    This paper investigates the different impacts of international and domestic technology in-licensing for Chinese firms as licensees on their technological capability building. The evolution of firms in developing countries and development of their technological capabilities has received increasing...... attention in the extant literature on both innovation management and international business. However, little has been done to reach a clear understanding on whether Chinese firms can benefit from international or domestic technology in-licensing and improve their own technological capabilities. This study......, therefore, pursues this endeavor by using a unique dataset from China State of Intellectual Property Office (SIPO) containing information on large Chinese firms. The findings of this empirical study indicate that firms with international technology in-licensing possess stronger technological innovation...

  8. Selection/licensing of nuclear power plant operators

    International Nuclear Information System (INIS)

    Saari, L.M.

    1983-07-01

    An important aspect of nuclear power plant (NPP) safety is the reactor operator in the control room. The operators are the first individuals to deal with an emergency situation, and thus, effective performance on their part is essential for safe plant operations. Important issues pertaining to NPP reactor operators would fall within the personnel subsystem of our safety system analysis. While there are many potential aspects of the personnel subsystem, a key first step in this focus is the selection of individuals - attempting to choose individuals for the job of reactor operator who will safely perform the job. This requires a valid (job-related) selection process. Some background information on the Nuclear Regulatory Commission (NRC) licensing process used for selecting NPP reactor operators is briefly presented and a description of a research endeavor now underway at Battelle for developing a valid reactor operator licensing examination is included

  9. 7 CFR 6.28 - Transfer of license.

    Science.gov (United States)

    2010-01-01

    ... Licensing Authority will transfer to such other person the historical, nonhistorical or designated license... escrow with the sole condition for return of escrow being that the Licensing Authority determines that... to whom the historical licenses were issued during the quota year in which the sale or conveyance...

  10. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    Directory of Open Access Journals (Sweden)

    Marco Ciurcina

    2017-06-01

    Full Text Available This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  11. Deficiency in origin licensing proteins impairs cilia formation: implications for the aetiology of Meier-Gorlin syndrome.

    Directory of Open Access Journals (Sweden)

    Tom Stiff

    Full Text Available Mutations in ORC1, ORC4, ORC6, CDT1, and CDC6, which encode proteins required for DNA replication origin licensing, cause Meier-Gorlin syndrome (MGS, a disorder conferring microcephaly, primordial dwarfism, underdeveloped ears, and skeletal abnormalities. Mutations in ATR, which also functions during replication, can cause Seckel syndrome, a clinically related disorder. These findings suggest that impaired DNA replication could underlie the developmental defects characteristic of these disorders. Here, we show that although origin licensing capacity is impaired in all patient cells with mutations in origin licensing component proteins, this does not correlate with the rate of progression through S phase. Thus, the replicative capacity in MGS patient cells does not correlate with clinical manifestation. However, ORC1-deficient cells from MGS patients and siRNA-mediated depletion of origin licensing proteins also have impaired centrosome and centriole copy number. As a novel and unexpected finding, we show that they also display a striking defect in the rate of formation of primary cilia. We demonstrate that this impacts sonic hedgehog signalling in ORC1-deficient primary fibroblasts. Additionally, reduced growth factor-dependent signaling via primary cilia affects the kinetics of cell cycle progression following cell cycle exit and re-entry, highlighting an unexpected mechanism whereby origin licensing components can influence cell cycle progression. Finally, using a cell-based model, we show that defects in cilia function impair chondroinduction. Our findings raise the possibility that a reduced efficiency in forming cilia could contribute to the clinical features of MGS, particularly the bone development abnormalities, and could provide a new dimension for considering developmental impacts of licensing deficiency.

  12. Licensing Teachers: Lessons from Other Professions.

    Science.gov (United States)

    Haberman, Martin

    1986-01-01

    The licensing of teachers should be modeled against professions similar to teaching rather than professions like medicine and architecture that are vastly different. Applying similar licensing practices can raise the status of teaching. Ignoring these licensing practices will prevent teachers from functioning as professionals. (MD)

  13. Sociological impacts of nuclear generating stations - summary report on the NRC post-licensing studies. Final report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Chalmers, J.; Pijawka, D.; Branch, K.; Bergmann, P.; Flynn, J.

    1982-07-01

    The Post-Licensing Studies had four objectives. The first was to identify the socioeconomic effects resulting from the construction and operation of each of twelve nuclear power stations. The socioeconomic variables examined included: economic, demographic, housing, government, public response, and social organization characteristics. The second objective was to determine the way in which the identified effects were evaluated by study area groups. The third objective was to identify the determinants of the project-related effects. This task required knowledge of what combination of site, project, or other determinants was responsible for the project-related effects and for the evaluation of the effects. The fourth objective was to make recommendations with respect to assessment methodologies that could best be used to project the socioeconomic effects of the construction and operation of proposed nuclear generating stations. The objectives of the Post-Licensing Studies are met by the twelve individual case studies and by the Summary Report. The case studies identified the nuclear power stations and describe the evaluation of the effects by area residents. The Summary Report describes the collective findings of the individual case studies, compares the findings across sites to identify possible determinants of the effects, and examines the implication of the findings for future siting decisions and for the methodology most appropriate for projective assessments

  14. Licensing of nuclear and radioactive installations in Peru

    International Nuclear Information System (INIS)

    Medina Gironzini, E.

    1987-01-01

    In Peru, the Regulation for Ionizing Radiation Sources is applied, which establishes the norms and procedures to follow in the nuclear and radioactive installations of the country in order to assure their correct operation as concerns to the nuclear safety and radiological protection, allowing the emission of the respective licenses. As for the nuclear facilities, this authorization includes the Previous License, the Construction License and the Operation License (provisional and definitive) and for radioactive facilities and equipment generating ionizing radiations: the Construction License and the Operation License. The personnel also require a license that can be an operator license (as for nuclear reactors) or a supervisor license (for nuclear and radioactive facilities). In spite of the above mentioned regulation and its long enforcement period, less than 10% of radioactive facilities in this country are licensed, due to different problems which will be solved in the medium term. (Author)

  15. The licensing processes influence on nuclear market

    International Nuclear Information System (INIS)

    Locatelli, Giorgio; Mancini, Mauro; Sainati, Tristano; Sallinen, Liisa

    2011-01-01

    The paper deals with the licensing nuclear power plants; it focuses primarily on the licensing process implications into the international nuclear market. Nowadays there are twenty-six countries that are planning to build new nuclear facilities, and thirty-seven where nuclear reactors are proposed; on the other hand, there are mainly ten international reactor vendors. At international level, there are few vendors that have sufficient resources, capabilities and experience to carry out the design and delivering of a nuclear power plant in the international market; On the other hand, the licensing processes are strictly dependent on national law frameworks, and on the nuclear policies. The paper proposes a comparison of six licensing processes (the ones established in Finland, France, Italy, South Korea, USA and UK), and analyzes its main features and implications; the IAEA licensing process is taken as reference point. The objective of the paper is to propose a systemic approach for considering the licensing procedures. The framework proposed enables facilitating the licensing management and inferring the main features of licensing contexts. The paper concludes with a forecast of the nuclear licensing context, especially with respect to the fourth generation of nuclear reactors. (author)

  16. Whom to Choose as License Partner?

    DEFF Research Database (Denmark)

    Laursen, Keld; Reichstein, Toke; Trombini, Giulia

    2013-01-01

    between technology and market forces: if partners are market distant, the likelihood of technology license contractual partnership decreases with partners’ technological distance. Using data on the formation of license partnerships in the global biopharmaceutical industry over the period 1994......This paper investigates the matching of firms on the market for technology. The paper forwards two dimensions along which license formation occurs: technology and product-market. Both sides of the market search for a partner representing potential for high technology synergies to maximize licensing...

  17. Exporting the Canadian licensing program

    International Nuclear Information System (INIS)

    Whelan, D.J.

    1981-06-01

    This paper deals with the problems of an overseas regulatory agency in licensing a Canadian-supplied nuclear plant which is referenced to a plant in Canada. Firstly, the general problems associated with the use of a reference plant are discussed. This is followed by a discussion of specific problems which arise from the licensing practices in Canada. The paper concludes with recommendations to simplify the task of demonstrating the licensability of an overseas CANDU plant

  18. 7 CFR 6.32 - Globalization of licenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Globalization of licenses. 6.32 Section 6.32 Agriculture Office of the Secretary of Agriculture IMPORT QUOTAS AND FEES Dairy Tariff-Rate Import Quota Licensing § 6.32 Globalization of licenses. If the Licensing Authority determines that entries of an article...

  19. 42 CFR 431.710 - Provisional licenses.

    Science.gov (United States)

    2010-10-01

    ... Licensing Nursing Home Administrators § 431.710 Provisional licenses. To fill a position of nursing home... 42 Public Health 4 2010-10-01 2010-10-01 false Provisional licenses. 431.710 Section 431.710 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  20. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  1. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  2. Nuclear facilities licensing

    International Nuclear Information System (INIS)

    Carvalho, A.J.M. de.

    1978-01-01

    The need for the adoption of a legal and normative system, defining objectives, pescriptions and the process of nuclear licensing and building of nuclear power plants in Brazil is enphasized. General rules for the development of this system are presented. The Brazilian rules on the matter are discussed. A general view of the German legal system for nuclear power plant licensing and the IAEA recommendations on the subject are finally presented. (A.L.S.L.) [pt

  3. Personality Factors and Nuclear Power Plant Operators: Initial License Success

    Science.gov (United States)

    DeVita-Cochrane, Cynthia

    Commercial nuclear power utilities are under pressure to effectively recruit and retain licensed reactor operators in light of poor candidate training completion rates and recent candidate failures on the Nuclear Regulatory Commission (NRC) license exam. One candidate failure can cost a utility over $400,000, making the successful licensing of new operators a critical path to operational excellence. This study was designed to discover if the NEO-PI-3, a 5-factor measure of personality, could improve selection in nuclear utilities by identifying personality factors that predict license candidate success. Two large U.S. commercial nuclear power corporations provided potential participant contact information and candidate results on the 2014 NRC exam from their nuclear power units nation-wide. License candidates who participated (n = 75) completed the NEO-PI-3 personality test and results were compared to 3 outcomes on the NRC exam: written exam, simulated operating exam, and overall exam result. Significant correlations were found between several personality factors and both written and operating exam outcomes on the NRC exam. Further, a regression analysis indicated that personality factors, particularly Conscientiousness, predicted simulated operating exam scores. The results of this study may be used to support the use of the NEO-PI-3 to improve operator selection as an addition to the current selection protocol. Positive social change implications from this study include support for the use of a personality measure by utilities to improve their return-on-investment in candidates and by individual candidates to avoid career failures. The results of this study may also positively impact the public by supporting the safe and reliable operation of commercial nuclear power utilities in the United States.

  4. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  5. 77 FR 71404 - Notice of Intent to License Government-Owned Inventions; Intent to License on a Partially...

    Science.gov (United States)

    2012-11-30

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent to License Government-Owned Inventions; Intent to License on a Partially-Exclusive Basis AGENCY: Department of the Army, DoD. ACTION... by the Secretary of the Army. The US Army Edgewood Chemical Biological Center intends to license...

  6. Licensing of ''grandfather's'' facilities: Ukrainian experience

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Bogdan, L.; Steinberg, N.

    1995-01-01

    In the former USSR, unlike most countries, radioactive waste management activities including waste disposal needed no license. But after the USSR breakdown the Ukrainian Parliament -- Verkhovna Rada -- invoked the revised Law on Business activities. According to Article 4 of the Law, in order to treat or to dispose radioactive waste every enterprise has to get a special permission or license. In compliance with the Law, the Cabinet of Ministers by its Ordinance of January 13, 1993, authorized the Ukrainian State Committee for Nuclear and Radiation Safety (UkrSCNRS) to issue special permissions or licenses for waste treatment and disposal. And that requirement was valid not only for future activities but also for existing facilities in operation. Taking into account the undergoing legislative process, SCNRS began to develop its licensing process without waiting for the special nuclear laws to be passed. On the basis of the legislation already in effect, first of all the Law on Enterprises (full responsibility of enterprises for their activities) and Law on Business activities (requirement to have a license for special types of activities), the newly formed national regulatory body had to identify all the enterprises that needed to be licensed, to establish relevant procedures, to develop related regulatory documents, to implement these procedures and documents at operating enterprises, and for each case to make a decision concerning feasibility of issuing a license, period of validity and license conditions

  7. Correlation of United States Medical Licensing Examination and Internal Medicine In-Training Examination Performance

    Science.gov (United States)

    Perez, Jose A., Jr.; Greer, Sharon

    2009-01-01

    The Internal Medicine In-Training Examination (ITE) is administered during residency training in the United States as a self-assessment and program assessment tool. Performance on this exam correlates with outcome on the American Board of Internal Medicine Certifying examination. Internal Medicine Program Directors use the United States Medical…

  8. The importance of environmental education in the process of nuclear and environmental licensing of nuclear facilities

    International Nuclear Information System (INIS)

    Araujo, Jefferson Borges; Ribeiro, Katia Maria Bruno

    2009-01-01

    Today, there is a thread with regard to the global environment. To reduce the environmental impact due to spending supplies to meet the basic needs of the global population. Can be considered as the power of these needs and in this context, the environmental impact occurs by the use of fossil fuels and loss of land for use of water resources. To minimize these impacts, governments are establishing appropriate laws towards the use of renewable energy. However it appears that there is still a great distance between the established law and implementation in practice. In this context nuclear energy is an attractive option, both economic and environmental. The facilities that are somehow associated with nuclear power plants are classified as radioactive or nuclear. These facilities are subject to two licensing procedures: Environmental (by IBAMA) and Nuclear (by CNEN). Nuclear installations such as nuclear power plants Angra 1 and 2, deposits and tailings facilities of the nuclear fuel cycle in Rezende that are more the attention of the population. As part of these processes are reports of analysis of safety and environmental impacts and socio-economic (EIA/RIMA RFAS), which are available to the public and then discussed at public hearings, where there is the opportunity for questions on these reports. These questions are mainly related with the social-environmental and economic due to construction and operation of these facilities. This work is a research, discussing the law, identifying the difficulties in the licensing process and presents a discussion on the importance of environmental education at all school levels, for adult audiences and is a connection between the environmental education and process of environmental licensing and nuclear, showing how the popular consciousness more informed can better discuss issues associated with these licenses, understand the advantages and disadvantages and obtain benefits. (author)

  9. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  10. 47 CFR 0.485 - Commercial radio operator examinations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commercial radio operator examinations. 0.485....485 Commercial radio operator examinations. Generally, written and telegraphy examinations for commercial radio operator licenses shall be conducted at locations and times specified by commercial operator...

  11. Effective legal protection in the licensing of technical installations

    International Nuclear Information System (INIS)

    Froehler, L.

    1987-01-01

    Undeterminate concepts of law shall match the dynamism of technical progress in licensing technical installations (e.g. section 7, para. 2 no. 3 Atomic Energy Act). The administration and the courts have the duty to equalize normative deficits of regulation. Decrees and administrative provisions have an important impact. Administrative courts shall exercise legal protection more efficiently what e.g. can be possible after a shortening of stages of appeal. (CW) [de

  12. 10 CFR 781.51 - Nonexclusive licenses.

    Science.gov (United States)

    2010-01-01

    ... corporate structure of which licensee is a part, if any. However, the license shall not be assignable or... license upon the policies of the United States Government; (3) The effect of the license upon domestic and... extent of U.S. Government contribution to the development of the invention; (iv) The degree of...

  13. 7 CFR 6.33 - License fee.

    Science.gov (United States)

    2010-01-01

    ... certified mail, return receipt requested, advising the licensee that if payment is not mailed in accordance.... Where the license at issue is a historical license, this will result, pursuant to § 6.23(b), in the person's loss of historical eligibility for such license. (d) Licensees may elect not to accept certain...

  14. Radiation control through licensing and intensive training

    International Nuclear Information System (INIS)

    Cheng, C.-H.; Yang, Y.-C.; Wu, T.-Y.; Weng, P.-S.

    1982-01-01

    Various types of intensive training courses to suit radiation workers in different fields were sponsored by both the Atomic Energy Council of Executive Yuan and the National Health Administration of Executive Yuan, Republic of China during the past seven years. During the years 1974-79, the number of radiation workers attending each training course, their age, sex and educational background are presented in detail. The typical course contents for both medical and non-medical radiation workers are given. A summary of the percentage of passes and failures of the final examination given at the end of each training course is also given. The present status of licensing for radiation facilities and workers is described, and its results are indicated. The successful control of ionizing radiation through this kind of intensive training and licensing is evidenced in the film badge records given by a centralized service laboratory located at the National Tsing Hua University. (author)

  15. Shrinking cities examined from a shrinking scale – the impact ...

    Science.gov (United States)

    Urban populations continue to increase globally and cities have become the dominant human habitat. However, the growth of cities is not universal. Shrinking cities face decreased income, reduced property values, and decreased tax revenue. Fewer people per unit area creates inefficiencies and higher costs for infrastructure maintenance and the provision of public amenities. However, population losses and economic distress are not equal in all neighborhoods, and in fact are quite heterogeneously distributed across the landscape. Broader statements about the trajectory of a shrinking city may mask underlying differences in economic, cultural, and environmental impacts as well as the ability of some neighborhoods to be resilient and adaptive to economic changes as well as climate change and other environmental stressors. This paper examines the recent impact of population loss in neighborhoods in the Río Piedras watershed in San Juan, Puerto Rico, on the provision of ecosystem services, material and energy flows, and ecological impacts, using public data and data collected previously in two household surveys. Using scenarios, we estimate future population changes and their potential positive and negative impacts on the environment and human well-being in these neighborhoods. This paper expands on prior research on shrinking cities by examining the impacts of population loss on urban social-ecological systems at the household and neighborhood scales. The purpose

  16. 25 CFR 11.601 - Marriage licenses.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Marriage licenses. 11.601 Section 11.601 Indians BUREAU... ORDER CODE Domestic Relations § 11.601 Marriage licenses. A marriage license shall be issued by the clerk of the court in the absence of any showing that the proposed marriage would be invalid under any...

  17. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  18. Licensing procedures and safety criteria for core conversion in Japan

    International Nuclear Information System (INIS)

    Kanda, K.; Nakagome, Y.; Hayashi, M.

    1983-01-01

    In Japan, the establishment and operation of nuclear installations are governed mainly by the Law for Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors. This law lays down the regulations and conditions for licensing of the various installations involved in the nuclear fuel cycle, namely licensing of installations for refining, fabricating and reprocessing; and reactors, as well as licensing of the use of nuclear fuels in research facilities. Although procedures for the installations listed above vary depending on the installation concerned, only those relating to construction and operation of reactor facilities will be analysed in this study, as the conditions and principles applying to licensing and control of other installations are, to a large extent, similar to those concerning reactor facilities. The second part of this presentation describes the safety review of the KUCA reactor core conversion form HEU to MEU. For the safety review of the core conversion, the Committee on Examination of Reactor Safety of Japanese Government examined mainly the the nuclear characteristics and the integrity of aluminide fuel plates, which was very severe because we had no experience to use aluminide fuel plates in Japan. The integrity of fuel plates and the results of the worst accident analysis for the MEU core are shown with the comparison between the HEU and MEU cores. The significant difference was not observed between them. All the regulatory procedures were completed in September 1980. Fabrication of MEU fuel elements for the KUCA experiments by CERCA in France was started in September 1980, and will be completed in March 1981. The critical experiments in the KUCA with MEU fuel will be started on a single-core in May 1981 as a first step. Those on a coupled-core will follow

  19. The optimal licensing contract in a differentiated Stackelberg model.

    Science.gov (United States)

    Hong, Xianpei; Yang, Lijun; Zhang, Huaige; Zhao, Dan

    2014-01-01

    This paper extends the work of Wang (2002) by considering a differentiated Stackelberg model, when the leader firm is an inside innovator and licenses its new technology by three options, that is, fixed-fee licensing, royalty licensing, and two-part tariff licensing. The main contributions and conclusions of this paper are threefold. First of all, this paper derives a very different result from Wang (2002). We show that, with a nondrastic innovation, royalty licensing is always better than fixed-fee licensing for the innovator; with a drastic innovation, royalty licensing is superior to fixed-fee licensing for small values of substitution coefficient d; however when d becomes closer to 1, neither fee nor royalty licensing will occur. Secondly, this paper shows that the innovator is always better off in case of two-part tariff licensing than fixed-fee licensing no matter what the innovation size is. Thirdly, the innovator always prefers to license its nondrastic innovation by means of a two-part tariff instead of licensing by means of a royalty; however, with a drastic innovation, the optimal licensing strategy can be either a two-part tariff or a royalty, depending upon the differentiation of the goods.

  20. AVC/H.264 patent portfolio license

    Science.gov (United States)

    Skandalis, Dean A.

    2006-08-01

    MPEG LA, LLC offers a joint patent license for the AVC (a/k/a H.264) Standard (ISO/IEC IS 14496-10:2004). Like MPEG LA's other licenses, the AVC Patent Portfolio License is offered for the convenience of the marketplace as an alternative enabling users to access essential intellectual property owned by many patent holders under a single license rather than negotiating licenses with each of them individually. The AVC Patent Portfolio License includes essential patents owned by DAEWOO Electronics Corporation; Electronics and Telecommunications Research Institute (ETRI); France Telecom, societe anonyme; Fujitsu Limited; Hitachi, Ltd.; Koninklijke Philips Electronics N.V.; LG Electronics Inc.; Matsushita Electric Industrial Co., Ltd.; Microsoft Corporation; Mitsubishi Electric Corporation; Robert Bosch GmbH; Samsung Electronics Co., Ltd.; Sedna Patent Services, LLC; Sharp Kabushiki Kaisha; Siemens AG; Sony Corporation; The Trustees of Columbia University in the City of New York; Toshiba Corporation; UB Video Inc.; and Victor Company of Japan, Limited. Another is expected also to join as of August 1, 2006. MPEG LA's objective is to provide worldwide access to as much AVC essential intellectual property as possible for the benefit of AVC users. Therefore, any party that believes it has essential patents is welcome to submit them for evaluation of their essentiality and inclusion in the License if found essential.

  1. EXPORT CONTROLS: Change in Export Licensing Jurisdiction for Two Sensitive Dual-Use Items

    National Research Council Canada - National Science Library

    Spencer, F

    1997-01-01

    This report examines the jurisdiction shift of two items, previously controlled by the State Department to the Department of Commerce, and the implications of this change to export licensing jurisdiction...

  2. IRS/TUEV activities during the licensing procedure. Safety assessment and preexamination

    International Nuclear Information System (INIS)

    Fendler, H.

    1976-01-01

    Short summary about the IRS/TUEV activities in the licensing procedure for a nuclear power plant: work for assessments, for pre-examination and approval specifications and drawings and for the quality control, time and the manpower necessary for this work. (orig./HP) [de

  3. Upstream petroleum licensing: a comparative approach on regulatory frameworks and economic impacts

    Energy Technology Data Exchange (ETDEWEB)

    Cunha, Amanda L. [Felsberg e Associados, Sao Paulo, SP (Brazil)

    2008-07-01

    The recent discoveries hit in the pre-salt area, such as Tupi, Jupiter, Bem-te-vi and Carioca may place Brazil amongst the largest oil producers in the world. As a result, the Brazilian regulatory framework, which was originally envisaged in a scenario of higher exploration risk, has been under heavy public scrutiny. The Brazilian Government has already taken the first steps towards substantial changes in the country's contracting model for upstream activities. By means of Resolution No. 6/2007, the National Council for Energy Policy ('CNPE') not only determined the removal of 41 blocks with sub-salt geology from the ANP 9 Th Bid Round, but also stressed the need for a different regime for E and P activities in the country's continental shelf. At this moment, there is a great deal of controversy on the contracting model to be adopted, mainly whether the concession model should be maintained, but subject to higher levels of government take, or a production sharing model should apply. This paper goes through the evolution of international oil agreements, from early concessions to modern agreements. A special emphasis is placed on concession/license regimes as well as on production sharing agreements (PSAs). Besides drawing a comparative line between such models, this article assesses their economic impacts and whether the regulatory framework currently in force in Brazil is suitable for a scenario of lower risk, showing that any desired level of regulation may be achieved in the context of a PSA as easily as in a exclusive concession. (author)

  4. The Optimal Licensing Contract in a Differentiated Stackelberg Model

    Directory of Open Access Journals (Sweden)

    Xianpei Hong

    2014-01-01

    Full Text Available This paper extends the work of Wang (2002 by considering a differentiated Stackelberg model, when the leader firm is an inside innovator and licenses its new technology by three options, that is, fixed-fee licensing, royalty licensing, and two-part tariff licensing. The main contributions and conclusions of this paper are threefold. First of all, this paper derives a very different result from Wang (2002. We show that, with a nondrastic innovation, royalty licensing is always better than fixed-fee licensing for the innovator; with a drastic innovation, royalty licensing is superior to fixed-fee licensing for small values of substitution coefficient d; however when d becomes closer to 1, neither fee nor royalty licensing will occur. Secondly, this paper shows that the innovator is always better off in case of two-part tariff licensing than fixed-fee licensing no matter what the innovation size is. Thirdly, the innovator always prefers to license its nondrastic innovation by means of a two-part tariff instead of licensing by means of a royalty; however, with a drastic innovation, the optimal licensing strategy can be either a two-part tariff or a royalty, depending upon the differentiation of the goods.

  5. Licensing and advanced fuel designs

    International Nuclear Information System (INIS)

    Davidson, S.L.; Novendstern, E.H.

    1991-01-01

    For the past 15 years, Westinghouse has been actively involved in the development and licensing of fuel designs that contain major advanced features. These designs include the optimized fuel assembly, The VANTAGE 5 fuel assembly, the VANTAGE 5H, and most recently the VANTAGE+ fuel assembly. Each of these designs was supported by extensive experimental data, safety evaluations, and design efforts and required intensive interaction with the US Nuclear Regulatory Commission (NRC) during the review and approval process. This paper presents a description of the licensing approach and how it was utilized by the utilities to facilitate the licensing applications of the advanced fuel designs for their plants. The licensing approach described in this paper has been successfully applied to four major advanced fuel design changes ∼40 plant-specific applications, and >350 cycle-specific reloads in the past 15 years

  6. Nuclear licensing in Slovenia

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.; Vojnovic, D.; Pristavec, M.

    1998-01-01

    The article presents the approach to nuclear licensing in Slovenia. The paper describes, the initialization, internal authorization and review process in the Krsko NPP. The overall process includes preparation, internal independent evaluation, the Krsko Operating Committee and the Krsko Safety Committee review and internal approval. In addition, the continuation of the licensing process is discussed which includes independent evaluation by an authorized institution and a regulatory body approval process. This regulatory body approval process includes official hearing of the licensee, communication with the licensee, and final issuance of a license amendment. The internal evaluation, which follows the methodology of US NRC (defined in 10 CFR 50.59 and NUMARC 125) is described. This concept is partially implemented in domestic legislation.(author)

  7. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  8. Concern about the Expanding Prescription Drug Epidemic: A Survey of Licensed Prescribers and Dispensers.

    Science.gov (United States)

    Wright, R Eric; Reed, Nia; Carnes, Neal; Kooreman, Harold E

    2016-01-01

    Prescription drug misuse and abuse has reached epidemic levels in the U.S., and stands as a leading cause of death. As the primary gatekeepers to the medications contributing to this epidemic, it is critical to understand the views of licensed health care professionals. In this study, we examine health care professionals' concern regarding prescription drug abuse in their communities and the impact their concern has had on their prescribing and dispensing practices. An online survey of licensed health care providers. Conducted in Indiana. This study was a state-wide evaluation of Indiana's prescription drug monitoring program. The questionnaire asked respondents how concerned they were about prescription drug abuse in their community. Variation in the level of concern was examined using ordinary least squares regression and information about the respondents' demographic background and clinical experience. In addition, we used logistic regression to examine whether concern was associated with changing prescribing and/or dispensing behavior. The majority of providers indicated they were "moderately" or "extremely concerned" about prescription drug abuse in their communities. The level of concern, however, varied significantly by profession, with pharmacists, physicians, nurse practitioners/physician assistants being more concerned than dentists. Additional analyses indicate that providers with higher levels of concern were those who also reported recently changing their prescribing and/or dispensing behavior. The voluntary nature and geographical focus of the study limits the generalizability of the findings. Concern about prescription drug abuse is generally high across the major health care professions; however, a significant minority of providers, particularly among dentists, expressed little or no concern about the epidemic. Increasing health care providers' general level of concern about prescription drug abuse may be an effective public health tool for

  9. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  10. Aerosol penetration of leak pathways : an examination of the available data and models.

    Energy Technology Data Exchange (ETDEWEB)

    Powers, Dana Auburn

    2009-04-01

    Data and models of aerosol particle deposition in leak pathways are described. Pathways considered include capillaries, orifices, slots and cracks in concrete. The Morewitz-Vaughan criterion for aerosol plugging of leak pathways is shown to be applicable only to a limited range of particle settling velocities and Stokes numbers. More useful are sampling efficiency criteria defined by Davies and by Liu and Agarwal. Deposition of particles can be limited by bounce from surfaces defining leak pathways and by resuspension of particles deposited on these surfaces. A model of the probability of particle bounce is described. Resuspension of deposited particles can be triggered by changes in flow conditions, particle impact on deposits and by shock or vibration of the surfaces. This examination was performed as part of the review of the AP1000 Standard Combined License Technical Report, APP-GW-GLN-12, Revision 0, 'Offsite and Control Room Dose Changes' (TR-112) in support of the USNRC AP1000 Standard Combined License Pre-Application Review.

  11. Changing mobility patterns and road mortality among pre-license teens in a late licensing country : an epidemiological study.

    NARCIS (Netherlands)

    Twisk, D.A.M. Bos, N.M. Shope, J.T. & Kok, G.

    2013-01-01

    Whereas the safety of teens in early licensing countries has been extensively studied, little is known about the safety of pre-license teens in late licensing countries, where these teens also may be at risk. This risk exists because of the combination of a) increasing use of travel modes with a

  12. 78 FR 17450 - Notice of Issuance of Materials License Renewal, Operating License SUA-1341, Uranium One USA, Inc...

    Science.gov (United States)

    2013-03-21

    ... License Renewal, Operating License SUA-1341, Uranium One USA, Inc., Willow Creek Uranium In Situ Recovery.... SUA- 1341 to Uranium One USA, Inc. (Uranium One) for its Willow Creek Uranium In Situ Recovery (ISR... Commission License No. SUA-1341 For Uranium One USA, Inc., Irigaray and Christensen Ranch Projects (Willow...

  13. The USNCR license renewal process

    International Nuclear Information System (INIS)

    Kuo, Pao-Tsin

    2002-01-01

    The US Congress promulgated a law in 1954, entitled 'Atomic Energy Act'. This Act states that operating licenses for commercial nuclear power plants are limited to a fixed term of 40 years, but they may be renewed for a period not to exceed 20 years. The terms were established mainly for economic considerations, not based on technical limitations. The U.S. Nuclear Regulatory Commission (USNRC) published the license renewal rule, Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), in December, 1991. The rule has since been amended in May, 1995. The underlying principle of the rule is that the regulatory process is adequate for ensuring safety of operating plants. The regulatory process includes NRC's issuance of Orders, Bulletins, Generic Letters, and Information Notices, as well as a number of special inspections in addition to the continuous oversight and routine inspection activities performed by on-site inspectors. Because of this comprehensive regulatory process, compilation of the current license basis or re-verification of the current licensing basis is not considered necessary for a license renewal review. The USNRC also determined on the basis of the findings of its research programs that active structures and components are well maintained by the existing programs. Therefore, the focus of the license renewal review is on passive, long-lived structures and components and on time-limited ageing analyses. The time-limited ageing analyses are for those structures and components which were originally designed to a 40 year service life

  14. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  15. License Compliance Issues For Biopharmaceuticals: Special Challenges For Negotiations Between Companies And Non-Profit Research Institutions

    Science.gov (United States)

    Ponzio, Todd A.; Feindt, Hans; Ferguson, Steven

    2011-01-01

    monitor the licensee’s diligence and progress; most exclusive licenses include a commercial development plan, with penalties, financial or even revocation of the license, if the plan is not followed, e.g., the license falls too far behind. This study examines whether developmental milestone schedules based on a small molecule drug development model are useful and realistic in setting expectations for biopharmaceutical product development. We reviewed the monitoring records of all exclusive Public Health Service (PHS) commercial development license agreements for small molecule drugs or therapeutics based on biotechnology (biopharmaceuticals) executed by the National Institutes of Health (NIH) Office of Technology Transfer (OTT) between 2003 and 2009. We found that most biopharmaceutical development license agreements required amending because developmental milestones in the negotiated schedule could not be met by the licensee. This was in stark contrast with license agreements for small molecule chemical compounds which rarely needed changes to their developmental milestone schedules. As commercial development licenses for biopharmaceuticals make up the vast majority of NIH’s exclusive license agreements, there is clearly a need to: 1) more closely examine how these benchmark schedules are formed, 2) try to understand the particular risk factors contributing to benchmark schedule non-compliance, and 3) devise alternatives to the current license benchmark schedule structural model. Schedules that properly weigh the most relevant risk factors such as technology classification (e.g., vaccine vs recombinant antibody vs gene therapy), likelihood of unforeseen regulatory issues, and company size/structure may help assure compliance with original license benchmark schedules. This understanding, coupled with a modified approach to the license negotiation process that makes use of a clear and comprehensive term sheet to minimize ambiguities should result in a more realistic

  16. License Compliance Issues For Biopharmaceuticals: Special Challenges For Negotiations Between Companies And Non-Profit Research Institutions.

    Science.gov (United States)

    Ponzio, Todd A; Feindt, Hans; Ferguson, Steven

    2011-09-01

    the licensee's diligence and progress; most exclusive licenses include a commercial development plan, with penalties, financial or even revocation of the license, if the plan is not followed, e.g., the license falls too far behind.This study examines whether developmental milestone schedules based on a small molecule drug development model are useful and realistic in setting expectations for biopharmaceutical product development. We reviewed the monitoring records of all exclusive Public Health Service (PHS) commercial development license agreements for small molecule drugs or therapeutics based on biotechnology (biopharmaceuticals) executed by the National Institutes of Health (NIH) Office of Technology Transfer (OTT) between 2003 and 2009. We found that most biopharmaceutical development license agreements required amending because developmental milestones in the negotiated schedule could not be met by the licensee. This was in stark contrast with license agreements for small molecule chemical compounds which rarely needed changes to their developmental milestone schedules. As commercial development licenses for biopharmaceuticals make up the vast majority of NIH's exclusive license agreements, there is clearly a need to: 1) more closely examine how these benchmark schedules are formed, 2) try to understand the particular risk factors contributing to benchmark schedule non-compliance, and 3) devise alternatives to the current license benchmark schedule structural model. Schedules that properly weigh the most relevant risk factors such as technology classification (e.g., vaccine vs recombinant antibody vs gene therapy), likelihood of unforeseen regulatory issues, and company size/structure may help assure compliance with original license benchmark schedules. This understanding, coupled with a modified approach to the license negotiation process that makes use of a clear and comprehensive term sheet to minimize ambiguities should result in a more realistic benchmark

  17. A meta-analytic review of moral licensing.

    Science.gov (United States)

    Blanken, Irene; van de Ven, Niels; Zeelenberg, Marcel

    2015-04-01

    Moral licensing refers to the effect that when people initially behave in a moral way, they are later more likely to display behaviors that are immoral, unethical, or otherwise problematic. We provide a state-of-the-art overview of moral licensing by conducting a meta-analysis of 91 studies (7,397 participants) that compare a licensing condition with a control condition. Based on this analysis, the magnitude of the moral licensing effect is estimated to be a Cohen's d of 0.31. We tested potential moderators and found that published studies tend to have larger moral licensing effects than unpublished studies. We found no empirical evidence for other moderators that were theorized to be of importance. The effect size estimate implies that studies require many more participants to draw solid conclusions about moral licensing and its possible moderators. © 2015 by the Society for Personality and Social Psychology, Inc.

  18. U.S. licensing process and ABWR certification

    International Nuclear Information System (INIS)

    Quirk, J.F.; Williams, W.A.

    1996-01-01

    Part 50 of Title 10 of the Code of Federal Regulation (CFR) establishes a two-step licensing process by which the U.S. Nuclear Regulatory Committee (NRC) authorizes nuclear reactor plant construction through issuance of a construction permit and authorizes operation by issuance of an operating license. At each stage, the NRC Staff conducts technical reviews and there is potential for public hearings. In 1989, the NRC issued a new, simplified licensing process: Part 52. The purpose of the Part 52 licensing process is to provide a regulatory framework that brings about earlier resolution of licensing issues. Because issues are not resolved early in the Part 50 licensing process, approval of an operating license is not assured until after a significant investment has been made in the plant. Part 52 increases the stability and certainty of the licensing process by providing for the early resolution of safety and environmental issues. The Part 52 licensing process features (1) early site permits, (2) design certification, and (3) combined construction permit and operating licenses. As part of the U.S. Advanced Light Water Reactor (ALWR) Program to revitalize the nuclear option through the integration of government/utility/industry efforts, GE undertook the role of applying for certification for its latest product line, the Advanced Boiling Water Reactor (ABWR), under the U.S. ABWR certification program. The ABWR design is an essentially complete plant. Initial application for design certification was in 1987 under Part 50. GE reapplied in late 1991 under the newly promulgated Part 52. Following seven years of intensive interactions with the NRC and ACRS, GE was awarded the first Final Design Approval (FDA) under Part 52. The Commission initiated rulemaking by publishing the proposed ABWR Certification Rule in the Federal Register in early 1995. Certification is anticipated mid-1996. (J.P.N.)

  19. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  20. Licensing reform in the USA

    International Nuclear Information System (INIS)

    1991-01-01

    The licensing process for nuclear power plants in the USA is currently in two distinct stages: the issuance of a construction permit followed later by the issuance of an operation license. The ''two-step'' process has come under heavy criticism from the U.S. nuclear industry on the grounds that it causes uncertainty and delays and therefore inhibits new commitments to nuclear power plants. In 1989 the NRC published new regulations for the licensing of nuclear power plants which provide for the issuance of early site permits, safety certifications of standard designs, and combined construction permits and operating licences. The new rule was challenged by intervenors representing antinuclear groups who filed a legal challenge seeking to have the rule set aside on the grounds that it violates the Atomic Energy Act which they allege makes two-step licensing mandatory. In November 1990 the US Court of Appeals upheld the NRC's authority to issue combined licenses. An appeal for a rehearing has been filed. The paper analyses the events and the possible consequences of an adverse court decision. It reviews the options open to the NRC and industry if the court decision is upheld. The possibility of congressional action to amend the Atomic Energy Act is discussed. (author)

  1. An introduction to intellectual property licensing for technology companies

    Science.gov (United States)

    Meier, Lawrence H.

    2001-05-01

    Intellectual property licensing is an important issue facing all technology companies. Before entering into license agreements a number of issues need to be addressed, including invention ownership, obtaining and identifying licensable subject matter, and developing a licensing strategy. There are a number of important provisions that are included in most intellectual property license agreements. These provisions include definitions, the license grant, consideration, audit rights confidentiality, warranties, indemnification, and limitation of liability. Special licensing considerations exist relative to each type of intellectual property, and when the other party is a foreign company or a university.

  2. 75 FR 55799 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-09-14

    ... licensing. Licensing Contact: Patrick P. McCue, PhD, (301) 435-5560; [email protected] . Collaborative... Reference No. E-051-2010/0-US-01). Licensing Status: Available for licensing. Licensing Contact: Patrick P... for the brain tumors or brain cancers indentified as gliomas, glioblastomas, or astrocytomas. This...

  3. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  4. 77 FR 47393 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2012-08-08

    ...: Voluntary surrender of license. License No.: 12454N. Name: Federation Exports-Imports Inc. Address: 747...: Natco International Transports USA, L.L.C. Address: 12415 SW 136th Avenue, Bay 4, Miami, FL 33186 Date...: Voluntary surrender of license. License No.: 022773F. Name: WLI (USA) Inc. Address: 175-01 Rockaway Blvd...

  5. 'Sly grog' and 'homebrew': a qualitative examination of illicit alcohol and some of its impacts on Indigenous communities with alcohol restrictions in regional and remote Queensland (Australia).

    Science.gov (United States)

    Fitts, Michelle S; Robertson, Jan; Towle, Simon; Doran, Chris M; McDermott, Robyn; Miller, Adrian; Margolis, Stephen; Ypinazar, Valmae; Clough, Alan R

    2017-08-01

    Indigenous communities in Queensland (Australia) have been subject to Alcohol Management Plans since 2002/03, with significant penalties for breaching restrictions. 'Sly grog' and 'homebrew' provide access to alcohol despite restrictions. This paper describes how this alcohol is made available and the risks and impacts involved. In affected towns and communities across a large area of rural and remote Queensland, interviews and focus groups documented experiences and views of 255 long-standing community members and service providers. Using an inductive framework, transcribed interviews were analysed to identify supply mechanisms, community and service provider responses and impacts experienced. 'Homebrew' was reportedly manufactured in just a few localities, in locally-specific forms bringing locally-specific harms. However, 'sly grog' sourced from licensed premises located long distances from communities, is a widespread concern across the region. 'Sly grog' sellers circumvent retailers' takeaway liquor license conditions, stockpile alcohol outside restricted areas, send hoax messages to divert enforcement and take extraordinary risks to avoid apprehension. Police face significant challenges to enforce restrictions. On-selling of 'sly grog' appears more common in remote communities with total prohibition. Despite different motives for involvement in an illicit trade 'sly grog' consumers and sellers receive similar penalties. There is a need for: (a) a more sophisticated regional approach to managing takeaway alcohol sales from licensed suppliers, (b) targeted penalties for 'sly grog' sellers that reflect its significant community impact, (c) strategies to reduce the demand for alcohol and (d) research to assess the effects of these strategies in reducing harms.

  6. The impact of safety legislation

    International Nuclear Information System (INIS)

    Turner, J.L.; Gill, J.R.

    1989-01-01

    The impact of medicines legislation for radiopharmaceuticals is discussed with regard to product licensing, production and quality control, marketing authorisation within the EC, licensing exemptions and authorisation for administration. As regards safety legislation for radiopharmaceuticals the requirements of the Ionising Radiations Regulations 1985 are outlined. (UK)

  7. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  8. Occupational radiation Exposure at Agreement State-Licensed Materials Facilities, 1997-2010

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research

    2012-07-07

    The purpose of this report is to examine occupational radiation exposures received under Agreement State licensees. As such, this report reflects the occupational radiation exposure data contained in the Radiation Exposure Information and Reporting System (REIRS) database, for 1997 through 2010, from Agreement State-licensed materials facilities.

  9. 14 CFR 1245.108 - License to contractor.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  10. License protection with a tamper-resistant token

    NARCIS (Netherlands)

    Chong, C.N.; Ren, Bin; Doumen, J.M.; Etalle, Sandro; Hartel, Pieter H.; Corin, R.J.; Lim, Chae Hoon; Yung, Moti

    Content protection mechanisms are intended to enforce the usage rights on the content. These usage rights are carried by a license. Sometimes, a license even carries the key that is used to unlock the protected content. Unfortunately, license protection is difficult, yet it is important for digital

  11. A review of electric cable aging effects and monitoring programs for plant license renewal

    International Nuclear Information System (INIS)

    Lofaro, R.J.

    1999-01-01

    As commercial nuclear power plants approach the end of their original license period, some utilities are considering the possibility of license renewal. The requirements for applying for license renewal are specified in the License Renewal Rule, which is in Title 10 of the Code of Federal Regulations, Part 54 (10 CFR54). Among the requirements specified in the rule is the performance of an Integrated Plant Assessment (IPA) which identifies and lists structures and components subject to an aging management review. The intent of this requirement is to ensure that aging degradation will not adversely affect plant safety during the license renewal period. The aging management review includes an identification of the aging effects and monitoring programs for components within the scope of the rule. Among the components within the scope are electric cables since they are passive, long-lived components that are not replaced on a periodic basis. This paper examines the aging causes and effects of electric cables, along with the programs that are typically used to ensure that proper aging management practices are in place to monitor and mitigate the effects of aging on electric cables

  12. Report of the Task Force on bonding and perpetual care of nuclear licensed activities

    International Nuclear Information System (INIS)

    Snellings, D.D. Jr.

    1975-01-01

    The primary concern was to consider the bonding and perpetual care requirements of state-licensed shallow land burial sites used for the disposal of radioactive wastes. The specific charge of the task force was to examine in detail the requirements for establishing bonding and perpetual care programs for all types of licensed nuclear activities and to report the findings of the task force as guidance to assist states in program development. Goals and recommendations of the task force are discussed

  13. 7 CFR 56.10 - Who may be licensed and authorized.

    Science.gov (United States)

    2010-01-01

    ... person to act as a “quality assurance inspector” in the packaging and grade labeling of products. No... (CONTINUED) VOLUNTARY GRADING OF SHELL EGGS Grading of Shell Eggs Licensed and Authorized Graders § 56.10 Who... determined by an examination for competency and who is to perform grading service under this part, may be...

  14. Trends in CANDU licensing

    International Nuclear Information System (INIS)

    Snell, V.G.; Grant, S.D.

    1997-01-01

    Modern utilities view nuclear power more and more as a commodity - it must compete 'today' with current alternatives to attract their investment. With its long construction times and large capital investment, nuclear plants are vulnerable to delays once they have been committed. There are two related issues. Where the purchaser and the regulator are experienced in CANDU, the thrust is a very practical one: to identify and resolve major licensing risks at a very early stage in the project. Thus for a Canadian project, the designer (AECL) and the prospective purchaser would deal directly with the AECB. However CANDU has also been successfully licensed in other countries, including Korea, Romania, Argentina, India and Pakistan. Each of these countries has its own regulatory agency responsible for licensing the plant. In addition, however, the foreign customer and regulator may seek input from the AECB, up to and including a statement of licensability in Canada; this is not normally needed for a ''repeat'' plant and/or if the customer is experienced in CANDU, but can be requested if the plant configuration has been modified significantly from an already-operating CANDU. It is thus the responsibility of the designer to initiate early discussions with the AECB so the foreign CANDU meets the expectations of its customers

  15. 47 CFR 97.5 - Station license required.

    Science.gov (United States)

    2010-10-01

    .... (3) A military recreation station license grant. A military recreation station license grant may be... States military recreational premises where the station is situated. The person must not be a... the balance of the license term and the suspension is still in effect, suspended for the balance of...

  16. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  17. Regulatory challenges for the licensing of future nuclear plants: A public interest perspective

    International Nuclear Information System (INIS)

    Lyman, Edwin S.

    2001-01-01

    Regulatory challenges concerned with licensing of advanced NPPs must ensure that economic imperatives do not have adverse impacts on safety, risk of radiological sabotage, waste management and disposal, non-proliferation, full opportunity for public participation. This presentation explains the mentioned issues using pebble bed reactor as an example

  18. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power license renewal in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. (author)

  19. 76 FR 31307 - Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively

    Science.gov (United States)

    2011-05-31

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively AGENCY: Department of the Army, DoD. ACTION: Notice. SUMMARY: The... Army. The US Army Edgewood Chemical Biological Center and the US Army Research Laboratory intend to...

  20. Evaluation of the Impact of Indoor Smoking Bans on Air Quality in Australian Licensed Clubs

    Science.gov (United States)

    Davidson, Margaret Elissa

    The quality of indoor air in Australian buildings is unknown due to limited published data. The assessment of indoor air quality (IAQ) in hospitality environments is of special concern because they are frequented by sensitive populations such as the elderly, children, and people with pre-existing health conditions, who may be at risk of developing adverse health reactions if the IAQ is poor. As of 2010, all Australian states and territories have introduced legalisation banning smoking in enclosed public places, including licensed clubs. This project has evaluated the impact of indoor smoking bans on air quality inside and outside of Australian licensed clubs. In doing this it has identified emerging IAQ issues in post smoking ban environments, and documented the airborne concentrations of previously unstudied air contaminants such as particulate matter with a 50% cut-point diameter of 1.0 ?m (PM1.0) and particulate polycyclic aromatic hydrocarbons (PPAH) in the indoor smoking areas of Australian licensed clubs. The study involved collecting approximately 400 hours of air quality data, of which 200 hours was collected before bans and 200 hrs was collected after smoking bans were introduced in licensed clubs located within two local government districts of South Eastern Australia. Clubs 1 to 7 were located in the one district and Clubs 8 to 11 in the other district. Club 4 dropped out following the pre ban monitoring, and the results were omitted from analysis. The air quality parameters measured inside include particulate matter with a 50% cut-point diameter of 2.5 mum (PM2.5), PPAH, carbon monoxide (CO), carbon dioxide mu(CO2), temperature and humidity. The air quality parameters measured outside were PM2.5, CO2, temperature and humidity. Each of the parameters were monitored for 4 hour periods on 4 occasions in each club both before, and after the introduction of indoor smoking bans. Additional monitoring of indoor concentrations of PM1.0, nicotine and PM2

  1. Answers to questions at public meetings regarding implementation of Title 10, Code of Federal Regulations, Part 55 on operators' licenses

    International Nuclear Information System (INIS)

    1987-11-01

    This document presents questions and answers based on the transcripts of four public meetings (and from written questions submitted after the meetings) conducted from April 9 to April 20, 1987 by the staff of the US Nuclear Regulatory Commission. The meetings discussed implementation of the Commission's final rule governing Operators' Licenses and Conforming Amendments (10 CFR Parts 55 and 50). The rule became effective May 26, 1987 and is intended to clarify the regulations for issuing licenses to operators and senior operators; revise the requirements and scope of written examinations and operating tests for operators and senior operators, require a simulation facility; clarify procedures for administering requalification examinations; and describe the form and content for operator license applications

  2. 9 CFR 2.6 - Annual license fees.

    Science.gov (United States)

    2010-01-01

    ... method used to calculate the license fee. All initial license and changed class of license fees must be... research facilities, dealers, exhibitors, retail pet stores, and persons for use as pets, directly or through an auction sale, by the dealer or applicant during his or her preceding business year (calendar or...

  3. Special feature of the facilities for final disposal of radioactive waste and its potential impact on the licensing process

    International Nuclear Information System (INIS)

    Lee Gonzales, Horacio M.; Medici, Marcela A.; Alvarez, Daniela E.; Biaggio, Alfredo L.

    2009-01-01

    During the lifetime of a radioactive waste disposal facility it is possible to identify five stages: design, construction, operation, closure and post-closure. While the design, and pre-operation stages are, to some extent, similar to other kind of nuclear or radioactive facilities; construction, operation, closure and post-closure have quite special meanings in the case of radioactive waste disposal systems. For instance, the 'closure' stage of a final disposal facility seems to be equivalent to the commissioning stage of a conventional nuclear or radioactive facility. This paper describes the unique characteristics of these stages of final disposal systems, that lead to concluded that their licensing procedure can not be assimilated to the standard licensing procedures in use for other nuclear or radioactive facilities, making it necessary to develop a tailored license system. (author)

  4. Policy development for environmental licensing and biodiversity offsets in Latin America.

    Directory of Open Access Journals (Sweden)

    Ana Villarroya

    Full Text Available Attempts to meet biodiversity goals through application of the mitigation hierarchy have gained wide traction globally with increased development of public policy, lending standards, and corporate practices. With interest in biodiversity offsets increasing in Latin America, we seek to strengthen the basis for policy development through a review of major environmental licensing policy frameworks in Argentina, Brazil, Chile, Colombia, Mexico, Peru and Venezuela. Here we focused our review on an examination of national level policies to evaluate to which degree current provisions promote positive environmental outcomes. All the surveyed countries have national-level Environmental Impact Assessment laws or regulations that cover the habitats present in their territories. Although most countries enable the use of offsets only Brazil, Colombia, Mexico and Peru explicitly require their implementation. Our review has shown that while advancing quite detailed offset policies, most countries do not seem to have strong requirements regarding impact avoidance. Despite this deficiency most countries have a strong foundation from which to develop policy for biodiversity offsets, but several issues require further guidance, including how best to: (1 ensure conformance with the mitigation hierarchy; (2 identify the most environmentally preferable offsets within a landscape context; (3 determine appropriate mitigation replacement ratios; and (4 ensure appropriate time and effort is given to monitor offset performance.

  5. Policy development for environmental licensing and biodiversity offsets in Latin America.

    Science.gov (United States)

    Villarroya, Ana; Barros, Ana Cristina; Kiesecker, Joseph

    2014-01-01

    Attempts to meet biodiversity goals through application of the mitigation hierarchy have gained wide traction globally with increased development of public policy, lending standards, and corporate practices. With interest in biodiversity offsets increasing in Latin America, we seek to strengthen the basis for policy development through a review of major environmental licensing policy frameworks in Argentina, Brazil, Chile, Colombia, Mexico, Peru and Venezuela. Here we focused our review on an examination of national level policies to evaluate to which degree current provisions promote positive environmental outcomes. All the surveyed countries have national-level Environmental Impact Assessment laws or regulations that cover the habitats present in their territories. Although most countries enable the use of offsets only Brazil, Colombia, Mexico and Peru explicitly require their implementation. Our review has shown that while advancing quite detailed offset policies, most countries do not seem to have strong requirements regarding impact avoidance. Despite this deficiency most countries have a strong foundation from which to develop policy for biodiversity offsets, but several issues require further guidance, including how best to: (1) ensure conformance with the mitigation hierarchy; (2) identify the most environmentally preferable offsets within a landscape context; (3) determine appropriate mitigation replacement ratios; and (4) ensure appropriate time and effort is given to monitor offset performance.

  6. License Auctions with Royalty Contracts for (Winners and) Losers

    OpenAIRE

    Wolfstetter, Elmar; Giebe, Thomas

    2007-01-01

    This paper revisits the licensing of a non–drastic process innovation by an outside innovator to a Cournot oligopoly. We propose a new mechanism that combines a restrictive license auction with royalty licensing. This mechanism is more profitable than standard license auctions, auctioning royalty contracts, fixed–fee licensing, pure royalty licensing, and two-part tariffs. The key features are that royalty contracts are auctioned and that losers of the auction are granted the option to si...

  7. 76 FR 17840 - Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively

    Science.gov (United States)

    2011-03-31

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively AGENCY: Department of the Army, DoD. ACTION: Notice. SUMMARY: The... McGill telephone: 410-436-8467, [email protected]us.army.mil , U.S. Army Edgewood Chemical Biological Center...

  8. RM - ODP to express nuclear licensing

    International Nuclear Information System (INIS)

    Barbosa, E.A.; Martucci, M. Jr.

    2002-01-01

    The scope of CNEN (Comissao Nacional de Energia Nuclear) is established by standards and procedures, which allow one context where several activities for nuclear licensing are realized by persons, machines and other entities of real world and by software systems. The CNEN objectives for licensing nuclear installations can be specified and they define how the systems are consisted, its nature, and which important elements were considered relevant for its constitution. The behavior, where the software will be operated, was likely defined in this paper through all aspects of its business process, which means from its licensing context. The concepts and definition showed here defined one specifics business domain, through ODP context. The functionalities of nuclear licensing process, the relationship scope and the rules of interaction that contributed for to specify the nuclear licensing process were defined, too. Therefore, the definition of the domain follows the orientation of architecture concepts and allows to implement the reflection model, where, with the auxiliary from IDEF0 (Integration Definition for Function Modeling) diagrams, the interactions between extern domains were mapped

  9. License - Gclust Server | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Gclust Server License License to Use This Database Last updated : 2009/09/14 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  10. Nuclear regulation. License renewal questions for nuclear plants need to be resolved

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Kruslicky, Mary Ann; McDowell, William D. Jr.; Coleman, Robert L.

    1989-04-01

    A December 1986 pipe rupture at Virginia Power's Surry unit 2 nuclear power plant injured eight workers; four later died. As a result of this accident, Representative Edward J. Markey requested GAO to examine the Surry accident and assess the problems confronting aging nuclear plants. In March 1988 we reported our findings concerning the accident and a July 1987 incident at the Trojan nuclear plant in Oregon. This report addresses problems confronting aging nuclear plants by examining the Nuclear Regulatory Commission's (NRC) program to develop a license renewal policy and accompanying regulations, and the initiatives underway by the Department of Energy (DOE) and the electric utility industry to extend the operating lives of these plants. Nuclear power has become second only to coal as the largest producer of electricity in the United States. The 110 nuclear plants currently in service are operated by 54 utilities, provide about 20 percent of the nation's electricity, and represent a capital investment of over $200 billion. The Atomic Energy Act authorizes NRC to issue nuclear plant operating licenses for up to 40 years and provides for license extensions beyond the initial operating period. The act does not, however, stipulate the criteria for evaluating a utility request to operate a nuclear plant longer than 40 years. The oldest operating license currently in effect will expire in the year 2000. According to NRC, about one-half of the existing operating licenses will terminate by the year 2015, and most licenses will expire by about 2030. Many utilities will have to decide in the early 1990s whether to continue operating older nuclear plants or to construct new generating capacity. A clear understanding of the terms and conditions governing the license renewal process will be a key element in deciding how to meet future electricity demand. Although NRC has developed 3 possible license renewal policy options and identified 15 areas of regulatory uncertainty that

  11. Negative royalty in duopoly and definition of license fee: general demand and cost functions

    OpenAIRE

    Hattori, Masahiko; Tanaka, Yasuhito

    2017-01-01

    We examine the relationship between the definition of license fee and a possibility of negative royalty in a duopoly with an outside innovator which has an option to enter the market and imposes a combination of a royalty per output and a fixed fee under general demand and cost functions. We consider two scenarios about determination of license fee. One is a scenario which does not assume entry of the innovator, and the other is a scenario which takes a possibility of entry of the innovator i...

  12. Impact of the Three Mile Island accident on reactor safety and licensing in Canada

    International Nuclear Information System (INIS)

    Harvie, J.D.

    1980-06-01

    This paper discusses the implications of the accident at Three Mile Island on reactor safety and licensing in Canada. Reactor safety principles which can be learned from, or are reaffirmed by, the accident are reviewed. It is concluded that reactor safety demands a firm commitment to safety by all those involved in the nuclear industry. (auth)

  13. Characterization of design ground motion for the central and eastern United States: licensing implications

    International Nuclear Information System (INIS)

    Litehiser, J.; Carrato, P.

    2005-01-01

    For the first time in decades several US utilities are exploring the possibility of building new Nuclear Power Plant (NPP) generating capacity in the Central and Eastern United States (CEUS). Among the many topics that must be considered to license a nuclear plant (NPP) is appropriate design to mitigate the potential effects of vibratory ground motion from earthquakes. Agreement on seismic design ground motion was not always easy during licensing of the last generation of NPPs. Therefore, over the last few decades both industry and the United States Nuclear Regulatory Commission (USNRC) have worked to find ground motion criteria that recognize and overcome earlier licensing difficulties. Such criteria should be stable and easily implemented. Important and complementary programs under the direction of the Lawrence Livermore National Laboratory (LLNL) and the Electric Power Research Institute (EPRI) were part of this effort, and these studies resulted in probabilistic seismic hazard assessments (PSHAs) for a number of CEUS NPP sites. These results and the concepts underlying them are now incorporated into both USNRC regulation and regulatory guidance. Nevertheless, as the utilities and the NRC begin a renewed licensing dialog, issues of regulatory interpretation of earthquake ground motion design criteria have emerged. These issues are as fundamental as the shape and amplitude of ground motion design response spectra and as significant as the impact of these spectra on structural design. Successful and timely resolution of these issues will significantly impact the future of nuclear power in the US. The purpose of this paper is to briefly describe some of these issues and the approaches that have been proposed for their resolution. (authors)

  14. International assistance. Licensing assistance project

    International Nuclear Information System (INIS)

    Aleev, A.

    1999-01-01

    Description of licensing assistance project for VATESI is presented. In licensing of unit No.1 of INPP VATESI is supported by many western countries. Experts from regulatory bodies or scientific organizations of those countries assist VATESI staff in reviewing documentation presented by INPP. Among bilateral cooperation support is provided by European Commission through Phare programme

  15. Aseismic Design Licensings and guidelines for nuclear power plant in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Yoshizawa, Kazumi [Agency of Natural Resources and Energy, Tokyo (Japan)

    1997-03-01

    This paper describes Aseismic Design Licensing for Japanese Nuclear Power Plants which includes system, procedures and brief contents concerned application, permit and inspection, and the `Examination Guide for Aseismic Design of the Nuclear Power Reactor Facilities` which focused principals of seismic design loads, load combinations, and allowable limits. (J.P.N.)

  16. Aseismic Design Licensings and guidelines for nuclear power plant in Japan

    International Nuclear Information System (INIS)

    Yoshizawa, Kazumi

    1997-01-01

    This paper describes Aseismic Design Licensing for Japanese Nuclear Power Plants which includes system, procedures and brief contents concerned application, permit and inspection, and the 'Examination Guide for Aseismic Design of the Nuclear Power Reactor Facilities' which focused principals of seismic design loads, load combinations, and allowable limits. (J.P.N.)

  17. 76 FR 71082 - Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application...

    Science.gov (United States)

    2011-11-16

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-9091; NRC-2011-0148] Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application; Notice of Intent To Prepare a... intent to prepare a supplemental environmental impact statement. SUMMARY: Strata Energy, Inc. (Strata...

  18. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  19. Overview of the Yucca Mountain Licensing Process

    International Nuclear Information System (INIS)

    M. Wisenburg

    2004-01-01

    This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process

  20. IRIS pre-application licensing

    International Nuclear Information System (INIS)

    Carelli, Mario D.; Kling, Charles L.; Ritterbusch, Stanley E.

    2003-01-01

    This paper presents the approach to pre-application licensing by the International Reactor Innovative and Secure (IRIS), and advanced, integral reactor design with a thermal power of 1000 MW. The rationale for the pre-application licensing is discussed. Since IRIS technology is based on proven LWR experience, the project will rely on AP600/AP1000 precedent and will focus during the pre-application on long lead and novel items. A discussion of the evolution of the project to significantly reduce licensing issues is provided, followed by a summary of the IRIS safety-by-design which provides a formidable first step in the Defense in Depth approach. The effects of the safety-by-design, as well as of passive systems, on the IRIS safety will be investigated in a proposed testing program that will be reviewed by NRC during the pre-application. Documentation to be provided to NRC is discussed. Early design analyses indicate that the benefits of the IRIS safety-by-design approach are so significant that the basic premise of current emergency planning regulations (i.e., likelihood of core damage) will be reduced to the extent that special emergency response planning beyond the exclusion area boundary may not be needed. How this very significant outcome can be effected through a highly risk-informed licensing is discussed. (author)

  1. Technical barriers, import licenses and tariffs as means of limiting market access

    DEFF Research Database (Denmark)

    Jørgensen, Jan G.; Schröder, Philipp

    2003-01-01

    Technical barriers (standards), import licenses and tariffs may be deployed as means of limiting the market entry of foreign firms. The present paper examines these measures in a setting of monopolistic competition. It is established that -- contrary to what one would expect -- a technical barrier...

  2. UK safety and standards for radioactive waste management and decommissioning on nuclear licensed sites

    International Nuclear Information System (INIS)

    Mason, D.J.

    2001-01-01

    This paper discusses the regulation of radioactive waste and decommissioning in the United Kingdom and identifies the factors considered by HM Nuclear Installations Inspectorate in examining the adequacy arrangements for their management on nuclear licensed sites. The principal requirements are for decommissioning to be undertaken as soon as reasonably practicable and that radioactive wastes should be minimised, disposed of or contained and controlled by storage in a passively safe form. However, these requirements have to be considered in the context of major organisational changes in the UK nuclear industry and the non-availability of disposal routes for some decommissioning wastes. The legislative framework used to regulate decommissioning of nuclear facilities in the UK is described. Reference is made to radioactive waste and decommissioning strategies, quinquennial reviews criteria for delicensing and the forthcoming Environmental Impact Assessment Regulations. (author)

  3. Where's the impairment: an examination of factors that impact sustained attention following a stressor.

    Science.gov (United States)

    Banks, Jonathan B; Tartar, Jaime L; Welhaf, Matthew S

    2014-01-01

    The impact of stress on cognitive functioning has been examined across multiple domains. However, few studies investigate both physical and psychological factors that impact cognitive performance. The current study examined the impact of a physical and psychosocial stressor on sustained attention and identified factors related to sustained attention, including cortisol, salivary alpha amylase (sAA) and mind wandering. A total of 53 participants completed either the socially evaluated cold pressor task or a control task followed by the sustained attention to response task with mind wandering measures. Participants also provided saliva samples following the attention task. Results indicate the stressor task did not impact mind wandering or sustained attention but increased cortisol and sAA. Mind wandering was negatively related to sustained attention and mediated the relationship between cortisol and sustained attention. The findings highlight the importance of examining multiple sources of stress-related cognitive impairments.

  4. Analyses of operating license renewal for nuclear power plants in USA

    International Nuclear Information System (INIS)

    Chiba, Goro

    2007-01-01

    Although the originally-approved operating period for nuclear power plants in the U.S. is 40 years, the operating periods of many plants have been extended by license renewal for another 20 years. On the other hand, in Japan, plant life management is carried out assuming long-term operation of the plant, and the electric power company submits reports, such as aging technology assessment, and receives evaluation by the authorities. In this paper, the situation regarding plant life management was investigated and a Japan-U.S. comparison was made. As a result, differences were found in the procedure, the background, the manpower, the review period, etc. in Japan and the U.S. but there is no difference between Japan and the U.S. in aiming for a check of the integrity of components, assuming long-term operation for 60 years. Moreover, trend analysis using the overseas fault database of INSS examined the effect on the preservation activities of a license renewal. As a result, there is a tendency for license renewal not to be applied for in units in which the number of aging faults increases with the increase in elapsed years. The U.S. license renewal system was considered to be effective in plant life management, and suggested the validity of plant life management in Japan which is employing the equivalent system to the U.S. (author)

  5. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal (LR) for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power LR in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. The reactor LRGDs referenced in this poster can all be accessed at http://www.nrc.gov/reactors/operating/licensing/renewal/guidance.html (author)

  6. A review of tritium licensing requirements

    International Nuclear Information System (INIS)

    Meikle, A.B.

    1982-12-01

    Present Canadian regulations and anticipated changes to these regulations relevant to the utilization of tritium in fusion facilities and in commercial applications have been reviewed. It is concluded that there are no serious licensing obstacles, but there are a number of requirements which must be met. A license will be required from Atomic Energy Control Board if Ontario Hydro tritium is to be applied by other users. A license is required from the Federal Government to export or import tritium. A licensed container will be required for the storage and shipping of tritium. The containers being designed by AECL and Ontario Hydro and which are currently being tested will adequately store and ship all of the Ontario Hydro tritium but are unnecessarily large for the small quantities required by the commercial tritium users. Also, some users may prefer to receive tritium in gaseous form. An additional, smaller container should be considered. The licensing of overseas fusion facilities for the use of tritium is seen as a major undertaking offering opportunities to Canadian Fusion Fuels Technology Project to undertake health, safety and environmental analysis on behalf of these facilities

  7. Software licenses: Stay honest!

    CERN Multimedia

    Computer Security Team

    2012-01-01

    Do you recall our article about copyright violation in the last issue of the CERN Bulletin, “Music, videos and the risk for CERN”? Now let’s be more precise. “Violating copyright” not only means the illegal download of music and videos, it also applies to software packages and applications.   Users must respect proprietary rights in compliance with the CERN Computing Rules (OC5). Not having legitimately obtained a program or the required licenses to run that software is not a minor offense. It violates CERN rules and puts the Organization at risk! Vendors deserve credit and compensation. Therefore, make sure that you have the right to use their software. In other words, you have bought the software via legitimate channels and use a valid and honestly obtained license. This also applies to “Shareware” and software under open licenses, which might also come with a cost. Usually, only “Freeware” is complete...

  8. Effectiveness of Oregon's teen licensing program : final report.

    Science.gov (United States)

    2008-06-01

    Significant changes in Oregons teen licensing laws went into effect on March 1, 2000. The new laws expanded the provisional driving license program which had been in effect since October 1989 and established a graduated driver licensing (GDL) prog...

  9. Assessment of the licensing aspects of HTGR in Yugoslavia

    International Nuclear Information System (INIS)

    Varazdinec, Z.

    1990-01-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  10. Assessment of the licensing aspects of HTGR in Yugoslavia

    Energy Technology Data Exchange (ETDEWEB)

    Varazdinec, Z [Institut za Elektroprivredu-Zagreb, Zagreb (Yugoslavia)

    1990-07-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  11. 10 CFR 34.13 - Specific license for industrial radiography.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Specific license for industrial radiography. 34.13 Section 34.13 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY... industrial radiography. An application for a specific license for the use of licensed material in industrial...

  12. An ontology based trust verification of software license agreement

    Science.gov (United States)

    Lu, Wenhuan; Li, Xiaoqing; Gan, Zengqin; Wei, Jianguo

    2017-08-01

    When we install software or download software, there will show up so big mass document to state the rights and obligations, for which lots of person are not patient to read it or understand it. That would may make users feel distrust for the software. In this paper, we propose an ontology based verification for Software License Agreement. First of all, this work proposed an ontology model for domain of Software License Agreement. The domain ontology is constructed by proposed methodology according to copyright laws and 30 software license agreements. The License Ontology can act as a part of generalized copyright law knowledge model, and also can work as visualization of software licenses. Based on this proposed ontology, a software license oriented text summarization approach is proposed which performances showing that it can improve the accuracy of software licenses summarizing. Based on the summarization, the underline purpose of the software license can be explicitly explored for trust verification.

  13. Impact of gene patents and licensing practices on access to genetic testing and carrier screening for Tay-Sachs and Canavan disease.

    Science.gov (United States)

    Colaianni, Alessandra; Chandrasekharan, Subhashini; Cook-Deegan, Robert

    2010-04-01

    Genetic testing for Tay-Sachs and Canavan disease is particularly important for Ashkenazi Jews, because both conditions are more frequent in that population. This comparative case study was possible because of different patenting and licensing practices. The role of DNA testing differs between Tay-Sachs and Canavan diseases. The first-line screening test for Tay-Sachs remains an enzyme activity test rather than genotyping. Genotyping is used for preimplantation diagnosis and confirmatory testing. In contrast, DNA-based testing is the basis for Canavan screening and diagnosis. The HEXA gene for Tay-Sachs was cloned at the National Institutes of Health, and the gene was patented but has not been licensed. The ASPA gene for Canavan disease was cloned and patented by Miami Children's Hospital. Miami Children's Hospital did not inform family members and patient groups that had contributed to the gene discovery that it was applying for a patent, and pursued restrictive licensing practices when a patent issued in 1997. This led to intense controversy, litigation, and a sealed, nonpublic 2003 settlement that apparently allowed for nonexclusive licensing. A survey of laboratories revealed a possible price premium for ASPA testing, with per-unit costs higher than for other genetic tests in the Secretary's Advisory Committee on Genetics, Health, and Society case studies. The main conclusion from comparing genetic testing for Tay-Sachs and Canavan diseases, however, is that patenting and licensing conducted without communication with patients and advocates cause mistrust and can lead to controversy and litigation, a negative model to contrast with the positive model of patenting and licensing for genetic testing of cystic fibrosis.

  14. Performance assessment and licensing issues for United States commercial near-surface low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    Birk, S.M.

    1997-10-01

    The final objective of performance assessment for a near-surface LLW disposal facility is to demonstrate that potential radiological impacts for each of the human exposure pathways will not violate applicable standards. This involves determining potential pathways and specific receptor locations for human exposure to radionuclides; developing appropriate scenarios for each of the institutional phases of a disposal facility; and maintaining quality assurance and control of all data, computer codes, and documentation. The results of a performance assessment should be used to demonstrate that the expected impacts are expected to be less than the applicable standards. The results should not be used to try to predict the actual impact. This is an important distinction that results from the uncertainties inherent in performance assessment calculations. The paper discusses performance objectives; performance assessment phases; scenario selection; mathematical modeling and computer programs; final results of performance assessments submitted for license application; institutional control period; licensing issues; and related research and development activities

  15. 48 CFR 252.227-7007 - License term-running royalty.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false License term-running... of Provisions And Clauses 252.227-7007 License term—running royalty. As prescribed at 227.7009-4(b), insert the following clause in patent releases, license agreements, and assignments: License Term—Running...

  16. 21 CFR 515.10 - Medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Medicated feed mill license applications. 515.10... (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.10 Medicated feed mill license applications. (a) Medicated feed mill license applications (Forms FDA 3448) may...

  17. License - AcEST | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us AcEST License to Use This Database Last updated : 2010/02/15 You may use this database in co...he Standard License specifies the license terms regarding the use of this database and the requirements you ...must follow in using this database. The Additional License specifies those items ... License The Standard License for this database is the license specified in the Creative Commons Attribution...-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  18. Regulatory analysis for amendments to regulations for the environmental review for renewal of nuclear power plant operating licenses. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This regulatory analysis provides the supporting information for a proposed rule that will amend the Nuclear Regulatory Commission's environmental review requirements for applications for renewal of nuclear power plant operating licenses. The objective of the proposed rulemaking is to improve regulatory efficiency by providing for the generic evaluation of certain environmental impacts associated with nuclear plant license renewal. After considering various options, the staff identified and analyzed two major alternatives. With Alternative A, the existing regulations would not be amended. This option requires that environmental reviews be performed under the existing regulations. Alternative B is to assess, on a generic basis, the environmental impacts of renewing the operating license of individual nuclear power plants, and define the issues that will need to be further analyzed on a case-by-case basis. In addition, Alternative B removes from NRC's review certain economics-related issues. The findings of this assessment are to be codified in 10 CFR 51. The staff has selected Alternative B as the preferred alternative

  19. Development and Field Test of Competency Based Instructional Material for a Career Mobility Program for Licensed Practical Nurses. Final Report.

    Science.gov (United States)

    Bergen Community Coll., Paramus, NJ.

    The Associate Degree Nursing Program at Bergen Community College developed and field tested competency-based instructional modules in a program designed to allow licensed practical nurses to qualify to take the certification examination for registered nurses after a year of study. Thirteen licensed practical nurses were enrolled in the first class…

  20. Environmental impact assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.; Kim, E. H.; Choi, K. S

    2000-10-01

    This report is the revised Environmental Impact Assessment Report which was made and submitted as one of the license documents for TRIGA Research Reactor D and D Project. The Environmental Impact Assessment Report includes introduction of decommissioning plan, status of reactors and environmental impact of surroundings. Also it was assessed and analyzed on radioactivity for environment, and the plan was established to minimize radioactive material release. Finally environmental monitoring plan was established to confirm whether contaminated or not from radioactivity during decommissioning period. According to the assessment results, the risk of excess exposure will be not on environment and public. The first Environmental Impact Assessment Report was submitted to the government for the license and reviewed by Korea Institute of Nuclear Safety. The first Report was revised including answers for the questions arising from review process.

  1. Study of a conceptual nuclear energy center at Green River, Utah: institutional and licensing issues

    International Nuclear Information System (INIS)

    Heilman, C.B.; Herman, A.A. Jr.; Vito, D.J.

    1982-04-01

    This document constitutes a segment of a feasibility study investigating the ramification of construcing a nuclear energy center in an arid western region. In this phase of the study, the institutional and licensing issues impacting a NEC were analyzed. The most prominent issue facing such a concept is the ownership form of NEC. In addition, legislation and regulation also have a substantial impact regardless of the ownership format

  2. Exploratory Shaft Facility quality assurance impact evaluation

    International Nuclear Information System (INIS)

    1987-08-01

    This report addresses the impact of the quality assurance practices used for the Exploratory Shaft Facility (ESF) design, and construction in licensing as part of the repository. Acceptance criteria used for evaluating the suitability of ESF QA practices are based on documents that had not been invoked for repository design or construction activities at the time of this evaluation. This report identifies the QA practices necessary for ESF design and construction licensability. A review and evaluation of QA practices for ESF design and construction resulted in the following conclusions. QA practices were found to be acceptable with a few exceptions. QA practices for construction activities were found to be insufficiently documented in implementing procedures to allow a full and effective evaluation for licensing purposes. Recommendations are provided for mitigating impacts to ensure compatibility of the QA practices with those considered necessary for repository licensing. 8 refs., 3 tabs

  3. 10 CFR 71.5 - Transportation of licensed material.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Transportation of licensed material. 71.5 Section 71.5 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PACKAGING AND TRANSPORTATION OF RADIOACTIVE MATERIAL General Provisions § 71.5 Transportation of licensed material. (a) Each licensee who transports licensed...

  4. 77 FR 51832 - Atomic Safety and Licensing Board; In the Matter of Progress Energy Florida, Inc. (Levy County...

    Science.gov (United States)

    2012-08-27

    ...] Atomic Safety and Licensing Board; In the Matter of Progress Energy Florida, Inc. (Levy County Nuclear... testimony are being heard, all of the proceedings will be open to the public. See 10 CFR 2.328. A. Matters.... Impacts resulting from active and passive dewatering; 2. Impacts resulting from the connection of the site...

  5. Introduction to Technology Export License of Nuclear Facility

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Hana; Lee, Chansuh; Shin, Donghoon [Korea Institute of Nuclear Nonproliferation and Control, Daejeon (Korea, Republic of)

    2014-05-15

    In this regime, the Nuclear Safety and Security Commission (NSSC) has authority on final decision making. And the Korea Institute of Nuclear nonproliferation and Control (KINAC) has missions to review the classification and export licensing technically. In principle, classification and export licensing are applied and reviewed individually. However, the number of application for classification and licensing has increased geometrically in the last three years. This is largely a due to the contract that the Republic of Korea (ROK) has finalized to build the UAE Barakah Nuclear Power Plant (BNPP) and Jordan Research and Training Reactor (JRTR). This circumstance brought an administrative burden for the government and related institutes as well as stakeholders. This article introduces the law related to the 'Technology Export License of Nuclear Facility' which was developed and legislated to improve the efficiency and effectiveness of commodities classification and export licensing. This system could significantly reduce the licensing burden for transferring the technologies. However, the classification and license on this system are still requested when transferring the goods. Therefore, KINAC will continue to figure out the needs for the stakeholders and keep searching for solutions to problems inherent in the industry.

  6. Introduction to Technology Export License of Nuclear Facility

    International Nuclear Information System (INIS)

    Seo, Hana; Lee, Chansuh; Shin, Donghoon

    2014-01-01

    In this regime, the Nuclear Safety and Security Commission (NSSC) has authority on final decision making. And the Korea Institute of Nuclear nonproliferation and Control (KINAC) has missions to review the classification and export licensing technically. In principle, classification and export licensing are applied and reviewed individually. However, the number of application for classification and licensing has increased geometrically in the last three years. This is largely a due to the contract that the Republic of Korea (ROK) has finalized to build the UAE Barakah Nuclear Power Plant (BNPP) and Jordan Research and Training Reactor (JRTR). This circumstance brought an administrative burden for the government and related institutes as well as stakeholders. This article introduces the law related to the 'Technology Export License of Nuclear Facility' which was developed and legislated to improve the efficiency and effectiveness of commodities classification and export licensing. This system could significantly reduce the licensing burden for transferring the technologies. However, the classification and license on this system are still requested when transferring the goods. Therefore, KINAC will continue to figure out the needs for the stakeholders and keep searching for solutions to problems inherent in the industry

  7. Benchmark for license plate character segmentation

    Science.gov (United States)

    Gonçalves, Gabriel Resende; da Silva, Sirlene Pio Gomes; Menotti, David; Shwartz, William Robson

    2016-09-01

    Automatic license plate recognition (ALPR) has been the focus of many researches in the past years. In general, ALPR is divided into the following problems: detection of on-track vehicles, license plate detection, segmentation of license plate characters, and optical character recognition (OCR). Even though commercial solutions are available for controlled acquisition conditions, e.g., the entrance of a parking lot, ALPR is still an open problem when dealing with data acquired from uncontrolled environments, such as roads and highways when relying only on imaging sensors. Due to the multiple orientations and scales of the license plates captured by the camera, a very challenging task of the ALPR is the license plate character segmentation (LPCS) step, because its effectiveness is required to be (near) optimal to achieve a high recognition rate by the OCR. To tackle the LPCS problem, this work proposes a benchmark composed of a dataset designed to focus specifically on the character segmentation step of the ALPR within an evaluation protocol. Furthermore, we propose the Jaccard-centroid coefficient, an evaluation measure more suitable than the Jaccard coefficient regarding the location of the bounding box within the ground-truth annotation. The dataset is composed of 2000 Brazilian license plates consisting of 14000 alphanumeric symbols and their corresponding bounding box annotations. We also present a straightforward approach to perform LPCS efficiently. Finally, we provide an experimental evaluation for the dataset based on five LPCS approaches and demonstrate the importance of character segmentation for achieving an accurate OCR.

  8. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  9. Licensing safety critical software

    International Nuclear Information System (INIS)

    Archinoff, G.H.; Brown, R.A.

    1990-01-01

    Licensing difficulties with the shutdown system software at the Darlington Nuclear Generating Station contributed to delays in starting up the station. Even though the station has now been given approval by the Atomic Energy Control Board (AECB) to operate, the software issue has not disappeared - Ontario Hydro has been instructed by the AECB to redesign the software. This article attempts to explain why software based shutdown systems were chosen for Darlington, why there was so much difficulty licensing them, and what the implications are for other safety related software based applications

  10. DOE Patents Available for Licensing

    International Nuclear Information System (INIS)

    Stuber, C.

    1981-01-01

    DOE Patents Available for Licensing (DOE PAL) provides abstracting and indexing coverage of the DOE patent literature, including patent applications, that concerns any apsect of energy production, conservation, and utilization. The citations are arranged by subject category. DOE is prepared to grant exclusive or nonexclusive, revocable licenses under DOE-owned US patents and patent applications in accordance with the provisions of 10CFR781

  11. Governing the league : Opportunism, credible threats ans social ties in football competition licensing

    NARCIS (Netherlands)

    Speklé, R.F.; Smittenaar, T.G.

    2008-01-01

    We examine the comparative effectiveness of three alternative licensing systems in professional football. The three systems’ main concern is with the promulgation of responsible financial behaviour among football clubs. To that effect, all three systems rely on entry control and ex ante budget

  12. 77 FR 59193 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-09-26

    ... Type: New OFF License. Bring Logistics US, Inc. (NVO & OFF), 4500 N. Sam Houston Parkway W., 130...: New NVO & OFF License. Contract Logistics, LLC (NVO & OFF), 4911 N. Portland Avenue, Suite 200.... Roush, Manager, Application Type: New NVO & OFF License. Crescent Line Inc. dba Globe Express Services...

  13. 25 CFR 558.4 - Granting a gaming license.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Granting a gaming license. 558.4 Section 558.4 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR GAMING LICENSES AND BACKGROUND INVESTIGATIONS FOR KEY EMPLOYEES AND PRIMARY MANAGEMENT OFFICIALS GAMING LICENSES FOR KEY EMPLOYEES AND PRIMARY...

  14. 75 FR 72824 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-26

    ... & OFF License. Everglory Logistics, Inc. (NVO & OFF), 440 McClellan Highway, 105F2, East Boston, MA..., Application Type: New NVO & OFF License. Hawaii Intermodal Tank Transport, LLC (NVO & OFF), 2350 S. Dock... Tran, Manager, Application Type: New NVO & OFF License. ITL USA Inc. dba International Transport...

  15. 78 FR 20107 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2013-04-03

    ... to maintain a valid bond. License No.: 016816F. Name: Green Integrated Logistics, Inc. Address: 16210... bond. License No.: 017054NF. Name: Asian Logistics, Inc. Address: 2079 South Atlantic Blvd., Suite D.... License No.: 020715N. Name: HI Trading International Corp. dba HI Transport International dba Shine...

  16. 32 CFR 643.126 - Transportation licenses.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Transportation licenses. 643.126 Section 643.126... ESTATE Additional Authority of Commanders § 643.126 Transportation licenses. Installation commanders are... free competitive proposals of all available companies or individuals. (b) DD Form 694 (Transportation...

  17. A comparison of licensed and un-licensed artisanal and small-scale gold miners (ASGM) in terms of socio-demographics, work profiles, and injury rates.

    Science.gov (United States)

    Calys-Tagoe, Benedict N L; Clarke, Edith; Robins, Thomas; Basu, Niladri

    2017-11-06

    Artisanal and small-scale gold mining (ASGM) represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention) as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months). Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events) and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73%) when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years) versus 5.0 (62 injuries in 1250 person-years) in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years) versus an un-licensed mine (6.1 per 100 person years). These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed site. The findings suggest that certain working

  18. Nuclear relevant installations licensing methodology in the Argentine Republic

    International Nuclear Information System (INIS)

    Paganini, C.E.

    1986-01-01

    A review of the requeriments of the Nuclear Installations Advisory Committee on Licensing (CALIN) from the nuclear security point of view, is presented. The methodology applied by the CALIN for the licensing in the Argentine Republic is included as well as codes, standards of applications and the interaction between the licensing Authority and the Responsible Entity during the whole process. Finally, the Atucha II nuclear power plant's licensing, in construction at present, is explained and the standard, of the licensing schedule, is presented graphically. (author) [es

  19. The National Site Licensing of Electronic Resources: An Institutional Perspective

    Directory of Open Access Journals (Sweden)

    Xiaohua Zhu

    2011-06-01

    Full Text Available While academic libraries in most countries are struggling to negotiate with publishers and vendors individually or collaboratively via consortia, a few countries have experimented with a different model, national site licensing (NSL. Because NSL often involves government and large-scale collaboration, it has the potential to solve many problems in the complex licensing world. However, not many nations have adopted it. This study uses historical research approach and the comparative case study research method to explore the seemingly low level of adoption. The cases include the Canadian National Site Licensing Project (CNSLP, the United Kingdom’s National Electronic Site Licensing Initiative (NESLI, and the United States, which has not adopted NSL. The theoretical framework guiding the research design and data collection is W. Richard Scott’s institutional theory, which utilizes three supporting pillars—regulative, normative, and cultural-cognitive—to analyze institutional processes. In this study, the regulative pillar and the normative pillar of NSL adoption— an institutional construction and change—are examined. Data were collected from monographs, research articles, government documents, and relevant websites. Based on the analysis of these cases, a preliminary model is proposed for the adoption of NSL. The factors that support a country’s adoption of NSL include the need for new institutions, a centralized educational policy-making system and funding system, supportive political trends, and the tradition of cooperation. The factors that may prevent a country from adopting NSL include decentralized educational policy and funding, diversity and the large number of institutions, the concern for the “Big Deal,” and the concern for monopoly.

  20. 48 CFR 1352.239-70 - Software license addendum.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Software license addendum... Software license addendum. As prescribed in 48 CFR 1339.107, insert the following clause: Software License....S.C. Section 516). (h) Renewal of Support after Expiration of this Award: Service will not...

  1. 76 FR 70145 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-11-10

    ...). Application Type: New NVO License. Alomar Transport, Inc. (NVO & OFF), 150-30 132nd Avenue, Suite 303, Jamaica... & OFF License. Forward System Logistics Inc. (NVO), 144-54 156th Street, Jamaica, NY 11434. Officers... NVO License. Green Line Shipping & Logistics Services Inc. (NVO & OFF), 16230 Lake View Lane, Apple...

  2. 76 FR 3635 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2011-01-20

    ... to maintain a valid bond. License Number: 004094F. Name: All Transport, Inc. Address: 8369 NW. 66th.... License Number: 020410F. Name: MBA Logistics, LLC. Address: 11455 Narin Drive, Brighton, MI 48114. Date... valid bonds. License Number: 021204NF. Name: United Logistics Corp. Address: 3650 Mansell Road, Suite...

  3. 76 FR 22106 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2011-04-20

    ...: Failed to maintain a valid bond. License Number: 018088N. Name: ILS-International Logistics Solutions... maintain a valid bond. License Number: 019369N. Name: Independent Transport Line, LLC dba ITL. Address... bond. License Number: 022322N. Name: O.T.S. Logistics, Inc. Address: 18726 South Western Avenue, Suite...

  4. Did Ontario's Zero Tolerance & Graduated Licensing Law Reduce Youth Drunk Driving?

    Science.gov (United States)

    Carpenter, Christopher

    2006-01-01

    On April 1, 1994, Ontario, Canada, instituted a new graduated driver license (GDL) system that effectively set the legal blood alcohol content (BAC) threshold at zero for the first few years of a youth's driving eligibility. I use data from the 1983-2001 Ontario Student Drug Use Surveys (OSDUS) to examine whether the Zero Tolerance (ZT) policy…

  5. License - Open TG-GATEs | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Open TG-GATEs License License to Use This Database Last updated : 2012/05/24 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  6. U.S. regulatory requirements for nuclear plant license renewal: The B and W Owners Group License Renewal Program

    International Nuclear Information System (INIS)

    Staudinger, Deborah K.

    2004-01-01

    This paper discusses the current U.S. Regulatory Requirements for License Renewal and describes the Babcock and Wilcox Owners Group (B and WOG) Generic License Renewal Program (GLRP). The B and W owners, recognizing the need to obtain the maximum life for their nuclear generating units, embarked on a program to renew the licenses of the seven reactors in accordance with the requirements of the Atomic Energy Act of 1954 and further defined by Title 10 of the Code of Federal Regulation Part 54 (10 CFR 54). These reactors, owned by five separate utilities, are Pressurized Water Reactors (PWR) ranging in net rated capacity from approximately 800 to 900 MW. The plants, predominately constructed in the 70s, have USNRC Operating Licenses that expire between 2013 to 2017. (author)

  7. Optimal Licensing Strategy: Royalty or Fixed Fee?

    OpenAIRE

    Andrea Fosfuri; Esther Roca

    2004-01-01

    Licensing a cost-reducing innovation through a royalty has been shown to be superior to licensing by means of a fixed fee for an incumbent licensor. This note shows that this result relies crucially on the assumption that the incumbent licensor can sell its cost-reducing inno-vation to all industry players. If, for any reason, only some competitors could be reached through a licensing contract, then a fixed fee might be optimally chosen.

  8. Postulated licensing schedule for an independent spent-fuel-storage installation

    International Nuclear Information System (INIS)

    Ludwick, J.D.

    1982-11-01

    A review of licensing requirements, processes, and anticipated actions for independent spent fuel storage installations (ISFSIs) was conducted in order to develop an estimated schedule and sequence of events for licensing a new ISFSI. This estimate will be useful to potential ISFSI owners in planning for the licensing of their facilities. It is concluded that, although many uncertainties exist with respect to such things as legal appeals, about 29 months are estimated to elapse between license application and license issuance for an ISFSI. This estimate is in reasonable agreement with a previous time estimate for licensing an ISFSI, and, taking into account the special circumstances involved, with the actual licensing schedule for the GE-Morris ISFSI. However, individual portions of the licensing schedule from each case studied sometimes vary significantly

  9. Technology Licensing Strategy for Network Product in a Service Industry

    Directory of Open Access Journals (Sweden)

    Xianpei Hong

    2015-01-01

    Full Text Available Technology licensing has gained significant attention in literature and practice as a rapid and effective way to improve firm’s capability of technology innovation. In this paper, we investigate a duopolistic service provider competition market, where service providers develop and sell a kind of network product. In this setting, we analyze the innovating service provider’s four licensing strategies: no licensing, fixed fee licensing, royalty licensing, and two-part tariff licensing. The literature suggests that when the network products can be completely substituted, two-part tariff licensing is the optimal strategy of the innovating service provider. We find that when the network products cannot be completely substituted, two-part tariff licensing is not always optimal. The degree of the product differentiation, the intensity of the network effects, and the R&D cost of the potential licensee play a key role in determining the innovating service provider’s optimal licensing strategies.

  10. License - TMFunction | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TMFunction License License to Use This Database Last updated : 2017/01/23 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...ion-Share Alike 4.0 International is found here . With regard to this database, you are licensed to: freely

  11. The case against a smoker's license.

    Directory of Open Access Journals (Sweden)

    Jeff Collin

    Full Text Available Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  12. The case for a smoker's license.

    Directory of Open Access Journals (Sweden)

    Simon Chapman

    Full Text Available BACKGROUND TO THE DEBATE: Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  13. The case for a smoker's license.

    Science.gov (United States)

    Chapman, Simon

    2012-01-01

    Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  14. The case against a smoker's license.

    Science.gov (United States)

    Collin, Jeff

    2012-01-01

    Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  15. 36 CFR 264.3 - Licensing for commercial use.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Licensing for commercial use... PROPERTY MANAGEMENT Official Forest Service Insignia § 264.3 Licensing for commercial use. (a) Each commercial license granted for the use of the insignia or likeness thereof shall contain the following terms...

  16. Why Not Wait? Eight Institutions Share Their Experiences Moving United States Medical Licensing Examination Step 1 After Core Clinical Clerkships.

    Science.gov (United States)

    Daniel, Michelle; Fleming, Amy; Grochowski, Colleen O'Conner; Harnik, Vicky; Klimstra, Sibel; Morrison, Gail; Pock, Arnyce; Schwartz, Michael L; Santen, Sally

    2017-11-01

    The majority of medical students complete the United States Medical Licensing Examination Step 1 after their foundational sciences; however, there are compelling reasons to examine this practice. This article provides the perspectives of eight MD-granting medical schools that have moved Step 1 after the core clerkships, describing their rationale, logistics of the change, outcomes, and lessons learned. The primary reasons these institutions cite for moving Step 1 after clerkships are to foster more enduring and integrated basic science learning connected to clinical care and to better prepare students for the increasingly clinical focus of Step 1. Each school provides key features of the preclerkship and clinical curricula and details concerning taking Steps 1 and 2, to allow other schools contemplating change to understand the landscape. Most schools report an increase in aggregate Step 1 scores after the change. Despite early positive outcomes, there may be unintended consequences to later scheduling of Step 1, including relatively late student reevaluations of their career choice if Step 1 scores are not competitive in the specialty area of their choice. The score increases should be interpreted with caution: These schools may not be representative with regard to mean Step 1 scores and failure rates. Other aspects of curricular transformation and rising national Step 1 scores confound the data. Although the optimal timing of Step 1 has yet to be determined, this article summarizes the perspectives of eight schools that changed Step 1 timing, filling a gap in the literature on this important topic.

  17. Nursing Distance Learning Course Comparison of Assignments and Examination Scores

    Science.gov (United States)

    Mundine, Jennifer

    2016-01-01

    Nursing programs have embraced distance learning in their curricula, but discussion is ongoing about course assignments and grading criteria to increase examination scores in nursing distance learning courses. Because course examinations are a predictor of success on the postgraduate licensing examination (NCLEX-RN), the purpose of this study was…

  18. Compliance with driver's license laws and illegal licensing among commercial bus drivers in Lagos, Nigeria: policy implications and evidence for action.

    Science.gov (United States)

    Okafor, I P; Odeyemi, K A; Dolapo, D C; Adegbola, A A

    2014-09-01

    To determine the level of compliance with driver's license laws among commercial bus drivers in Lagos, Nigeria. Two intercity motor parks were selected by simple random sampling and all consenting minibus drivers participated in the study. Key Informant Interviews (KIIs) were also conducted with selected officials in the driver training and licensing authorities. Compliance with the minimum age for driving was high (93.6%), so also was having driving test prior to driver's license procurement (83.3%). Formal driver training and VA testing were very low, (26.1% and 32.9% respectively) Overall, only 9.3% of them were found to have fulfilled all the pre-license obligations before obtaining their first driver's license. The odds of a driver with a secondary education having formal driver training is 3.33 times higher than those with no education (OR 3.33, 95% CI 1.01-11.35). Drivers who were 60 years or older were 3.62 times more likely to be compliant than those who were between 20-29 years (OR 3.62, 95% CI 0.56-29.19). For the 98.3% of them who possessed valid licenses, 52.3% of them obtained them illegally. All the key officials saw RTIs as a serious public health problem but faced several challenges in the course of their work. Overall compliance with pre-license regulations was very poor. There is need for a review and strict enforcement of driver's license laws to improve compliance. Also vital are fostering inter-sectoral collaboration and improvement in the operations of all establishments involved in driver training and license procurement in Nigeria.

  19. 75 FR 4571 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-01-28

    .... Applications: Therapies for tumors associated with NF1 (including brain and peripheral nervous system tumors...-US-01). Licensing Status: Available for licensing. Licensing Contact: Patrick P. McCue, Ph.D.; 301...

  20. List of Nuclear Materials Licensing Actions Received

    Data.gov (United States)

    Nuclear Regulatory Commission — A catalog of all Materials Licensing Actions received for review. The catalog lists the name of the entity submitting the license application, their city and state,...

  1. 36 CFR 271.4 - Commercial license.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Commercial license. 271.4... BEARâ SYMBOL § 271.4 Commercial license. (a) The Chief may authorize the commercial manufacture... a use or royalty charge which is reasonably related to the commercial enterprise has been...

  2. NEG-shift, Licensing, and Repair Strategies

    DEFF Research Database (Denmark)

    Christensen, Ken Ramshøj

    2008-01-01

    I entertain the idea that the cross-linguistic variation in the licensing of NEG-shift, the movement of negative objects to spec-NegP, can be accounted for by a few representational constraints that are not directly related to case licensing or feature checking, and which potentially conflict...

  3. TMI-related requirements for new operating licenses. Technical report

    International Nuclear Information System (INIS)

    1980-06-01

    There are four types of TMI-related requirements and actions approved by the Commission for new operating licenses: (1) those required to be completed by a license applicant prior to receiving a fuel-loading and low-power testing license, (2) those required to be completed by a license applicant prior to receiving a license to operate at appreciable power levels up to full power, (3) those the NRC will take prior to issuing a fuel-loading and low-power testing or a full-power operating license, and (4) those required to be completed by a licensee prior to a specified date. In this report, only those dated requirements that have already been issued are of interest. Other dated requirements are expected to be issued in the future as work progresses in accordance with the TMI Action Plan. This report summarizes the several parts of the list of TMI-related requirements approved by the Commission for new operating licenses

  4. Examining the Impact of Culture and Human Elements on OLAP Tools Usefulness

    Science.gov (United States)

    Sharoupim, Magdy S.

    2010-01-01

    The purpose of the present study was to examine the impact of culture and human-related elements on the On-line Analytical Processing (OLAP) usability in generating decision-making information. The use of OLAP technology has evolved rapidly and gained momentum, mainly due to the ability of OLAP tools to examine and query large amounts of data sets…

  5. Reassessing Occupational Licensing Of Tour Guides (Opinion Piece

    Directory of Open Access Journals (Sweden)

    Amir SHANI

    2017-06-01

    Full Text Available It is conventionally held that to protect tourists from incompetent and/or unscrupulous tour guides, governments should require guides to be licensed in order to legally practice their profession. Despite the implementation of such regulatory statutes in many countries, it is argued in this opinion paper that the severe drawbacks of licensing demands should be re-evaluated by both policy-makers and tourism scholars. The licensing of guides is not only an ineffective means of quality assurance, with negative consequences for many of those involved, but it also undermines the ethical foundations of a free society. Furthermore, licensing is an archaic practice for ensuring standardization among the members of a profession in a way that is no longer suitable for addressing the challenges of the tourism industry in the 21st century, in which a wide variety of specialized and innovative guided tours are offered to tourists. Although this commentary presents a firm stand against the compulsory licensing of tour guides, it should be seen as an invitation for open discussion among tourism researchers regarding the necessity of licensing tour guides in particular, and of government tourism regulation in general. Moreover, further research is needed to clarify key points on the issue of the professional licensing of tour guides.

  6. 50 CFR 80.4 - Diversion of license fees.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Diversion of license fees. 80.4 Section 80... fees. Revenues from license fees paid by hunters and fishermen shall not be diverted to purposes other than administration of the State fish and wildlife agency. (a) Revenues from license fees paid by...

  7. 27 CFR 555.45 - Original license or permit.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false Original license or permit. 555.45 Section 555.45 Alcohol, Tobacco Products, and Firearms BUREAU OF ALCOHOL, TOBACCO, FIREARMS... Original license or permit. (a) Licenses issued prior to May 24, 2003. Any person who intends to engage in...

  8. Perspective about the US license Renewal for NNPP's

    International Nuclear Information System (INIS)

    Lehnert, D. F.

    2004-01-01

    This article provides and overview of the US License Renewal Rule, 10 CFR 54, and its implementation in the US leading to the preparation and review of a license renewal application. The key regulatory documents and the industry's methodology and guidance for successfully implementing the Rule are discussed. While the process still undergoes change and optimization, it has become predictable and reliable, such that utilities can establish realistic schedules and budgets to complete the license renewal process. Nearly 60% of the US operating units have either received and extended operating license, have submitted their application for review, or have committed to submit an application in the next few years. The article concludes with a discussion of lessons learned from this wealth of experience and some emerging issues that may affect license renewal process. (Author)

  9. On the effectiveness of a license scheme for E-waste recycling: The challenge of China and India

    International Nuclear Information System (INIS)

    Shinkuma, Takayoshi; Managi, Shunsuke

    2010-01-01

    It is well known that China and India have been recycling centers of WEEE, especially printed circuit boards, and that serious environmental pollution in these countries has been generated by improper recycling methods. After the governments of China and India banned improper recycling by the informal sector, improper recycling activities spread to other places. Then, these governments changed their policies to one of promoting proper recycling by introducing a scheme, under which E-waste recycling requires a license issued by the government. In this paper, the effectiveness of that license scheme is examined by means of an economic model. It can be shown that the license scheme can work effectively only if disposers of E-waste have a responsibility to sell E-waste to license holders. Our results run counter to the idea that international E-waste trade should be banned and provide an alternative solution to the problem.

  10. A comparison of licensed and un-licensed artisanal and small-scale gold miners (ASGM in terms of socio-demographics, work profiles, and injury rates

    Directory of Open Access Journals (Sweden)

    Benedict N. L. Calys-Tagoe

    2017-11-01

    Full Text Available Abstract Background Artisanal and small-scale gold mining (ASGM represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. Methods In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Results Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months. Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73% when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years versus 5.0 (62 injuries in 1250 person-years in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years versus an un-licensed mine (6.1 per 100 person years. Conclusions These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed

  11. Licensing of simple digital devices

    International Nuclear Information System (INIS)

    Jackson, T. W.

    2008-01-01

    The inability to guarantee error-free software gave rise to the potential for common-cause failure of digital safety systems in nuclear power plants. To address this vulnerability, the U. S. Nuclear Regulatory Commission (NRC) required a quality software development process and a defense-in-depth and diversity analysis for digital safety systems. As a result of recent interim [NRC] staff guidance in the digital instrumentation and control (I and C) area, licensing of simple digital devices decreases some regulatory burden with respect to demonstrating a quality software development process and defense-in-depth and diversity analysis. This paper defines simple digital devices and addresses the interim staff guidance that applies to such devices. The paper also highlights the technical aspects that affect the licensing of such devices and incorporates licensing experience in the U.S. to date. (authors)

  12. 27 CFR 478.44 - Original license.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false Original license. 478.44 Section 478.44 Alcohol, Tobacco Products, and Firearms BUREAU OF ALCOHOL, TOBACCO, FIREARMS, AND....44 Original license. (a)(1) Any person who intends to engage in business as a firearms or ammunition...

  13. Proposed Regulations for Medical Examination of the Radiation Worker

    International Nuclear Information System (INIS)

    Shabon, M.H.

    2015-01-01

    Owing to the widespread use of ionising radiation and radioactive isotopes and their well recognized adverse effects on human health. General requirements for workers to grant license to use ionizing radiation in Egypt was reported in the executive of Egyptian ionizing radiation regulation in 1962 following ionizing radiation law no. 59 for the year 1960. Egyptian Nuclear and Radiological Regulatory Authority (ENRRA) has enforced law no. 7 in 2010 and its executive regulation in 2011 through requesting certificates of medical examination as a requirement to grant Egyptian license to ionizing radiation worker. A deficiency in medical examination and special investigations for pre-placement and follow up of the radiation worker has been noticed. This paper provides practical guidance to the employers and the appointed doctors about health surveillance and medical examinations of the radiation worker. Past history, present history, clinical examination and investigations are presented. Illnesses and conditions that prevent the person to be classified are also mentioned.

  14. ITER Safety and Licensing

    International Nuclear Information System (INIS)

    Girard, J-.P; Taylor, N.; Garin, P.; Uzan-Elbez, J.; GULDEN, W.; Rodriguez-Rodrigo, L.

    2006-01-01

    The site for the construction of ITER has been chosen in June 2005. The facility will be implemented in Europe, south of France close to Marseille. The generic safety scheme is now under revision to adapt the design to the host country regulation. Even though ITER will be an international organization, it will have to comply with the French requirements in the fields of public and occupational health and safety, nuclear safety, radiation protection, licensing, nuclear substances and environmental protection. The organization of the central team together with its partners organized in domestic agencies for the in-kind procurement of components is a key issue for the success of the experimentation. ITER is the first facility that will achieve sustained nuclear fusion. It is both important for the experimental one-of-a-kind device, ITER itself, and for the future of fusion power plants to well understand the key safety issues of this potential new source of energy production. The main safety concern is confinement of the tritium, activated dust in the vacuum vessel and activated corrosion products in the coolant of the plasma-facing components. This is achieved in the design through multiple confinement barriers to implement the defence in depth approach. It will be demonstrated in documents submitted to the French regulator that these barriers maintain their function in all postulated incident and accident conditions. The licensing process started by examination of the safety options. This step has been performed by Europe during the candidature phase in 2002. In parallel to the final design, and taking into account the local regulations, the Preliminary Safety Report (RPrS) will be drafted with support of the European partner and others in the framework of ITER Task Agreements. Together with the license application, the RPrS will be forwarded to the regulatory bodies, which will launch public hearings and a safety review. Both processes must succeed in order to

  15. Licensing of nuclear reactor operators

    International Nuclear Information System (INIS)

    1979-09-01

    Recommendations are presented for the licensing of nuclear reactor operators in units licensed according to the legislation in effect. They apply to all physical persons designated by the Operating Organization of the nuclear reactor or reactors to execute any of the following functional activities: a) to manipulate the controls of a definite reactor b) to direct the authorized activities of the reactor operators licesed according to the present recommendations. (F.E.) [pt

  16. Scallop License Limitation Program (SLLP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A federal Scallop License Limitation Program (SLLP) license is required onboard any vessel deployed in scallop fisheries in Federal waters off Alaska (except for...

  17. Nuclear power plant simulators for operator licensing and training. Part I. The need for plant-reference simulators. Part II. The use of plant-reference simulators

    International Nuclear Information System (INIS)

    Rankin, W.L.; Bolton, P.A.; Shikiar, R.; Saari, L.M.

    1984-05-01

    Part I of this report presents technical justification for the use of plant-reference simulators in the licensing and training of nuclear power plant operators and examines alternatives to the use of plant-reference simulators. The technical rationale is based on research on the use of simulators in other industries, psychological learning and testing principles, expert opinion and user opinion. Part II discusses the central considerations in using plant-reference simulators for licensing examination of nuclear power plant operators and for incorporating simulators into nuclear power plant training programs. Recommendations are presented for the administration of simulator examinations in operator licensing that reflect the goal of maximizing both reliability and validity in the examination process. A series of organizational tasks that promote the acceptance, use, and effectiveness of simulator training as part of the onsite training program is delineated

  18. Federal/State cooperation in the licensing of a nuclear power project. A joint licensing process between the US Nuclear Regulatory Commission and the Washington State Energy Facility Site Evaluation Council

    International Nuclear Information System (INIS)

    1984-05-01

    This report summarizes and documents a joint environmental review and licensing process established between the US Nuclear Regulatory Commission (NRC) and the Washington State Energy Facility Site Evaluation Council (EFSEC) in 1980-1983 for the Skagit/Hanford Nuclear Project (S/HNP). It documents the agreements made between the agencies to prepare a joint environmental impact statement responsive to the requirements of the National Environmental Policy Act of 1969 (NEPA) and the Washington State Environmental Policy Act. These agreements also established protocol to conduct joint public evidentiary hearings on matters of mutual jurisdiction, thereby reducing the duplication of effort and increasing the efficiency of the use of resources of federal and state governments and other entities involved in the process. This report may provide guidance and rationale to licensing bodies that may wish to adopt some of the procedures discussed in the report in the event that they become involved in the licensing of a nuclear power plant project. The history of the S/HNP and of the agreement processes are discussed. Discussions are provided on implementing the joint review process. A separate section is included which presents independent evaluations of the process by the applicant, NRC, and EFSEC

  19. Trouble in paradise: The crime and health outcomes of the Surfers Paradise licensed venue lockout.

    Science.gov (United States)

    de Andrade, Dominique; Homel, Ross; Townsley, Michael

    2016-09-01

    The lockout intervention has become embedded in Australian alcohol policy with little scientific evidence of its effectiveness in reducing violence and disorder. This paper reports an evaluation of the Queensland lockout pilot in Surfers Paradise. Patrons could not enter or re-enter licensed venues after 3 am, while patrons inside at this time could stay until close. Using police and ambulance data, time series analyses examined the impact of tourism seasons and the lockout on rates of crime, violence, injury and intoxication. Additional analyses were also conducted to show spatial and temporal changes in crime over time. Both police and ambulance data showed that the lockout introduction had no statistically significant impact on rates of crime, violence, head and neck injuries, and intoxication over the 2 years following lockout. Hot spot maps indicated limited spatial shift of crime within Surfers Paradise following the lockout introduction, with evidence of a temporary intensification of crime in already established hot spots. We found a moderate statistically significant change in the 24 h distribution of crime after the lockout implementation, suggesting temporal displacement of crime. Results support the small existing body of evidence on lockouts that indicates they are largely ineffective in reducing crime and injuries in entertainment districts. As multi-pronged strategies that include a lockout gain in popularity, further investigation should focus on identifying the key drivers of successful interventions such as the Newcastle strategy, to better refine these interventions for replication and evaluation elsewhere. [De Andrade D, Homel R, Townsley M. Trouble in paradise: The crime and health outcomes of the Surfers Paradise licensed venue lockout. Drug Alcohol Rev 2016;35:564-572]. © 2016 Australasian Professional Society on Alcohol and other Drugs.

  20. Empirical Study of Car License Plates Recognition

    OpenAIRE

    Dina, Nasa Zata; Dailey, Matthew

    2015-01-01

    The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms ...

  1. Guide to request license for teletherapy practice

    International Nuclear Information System (INIS)

    2000-01-01

    In this work the steps to request license for teletherapy practice are described , among these steps they it continued it plows to request the qualified personnel's yams, the operation authorization, application purpose, license type

  2. Gas Reactor International Cooperative Program. Interim report. Safety and licensing evaluaion of German Pebble Bed Reactor concepts

    International Nuclear Information System (INIS)

    1978-09-01

    The Pebble Bed Gas Cooled Reactor, as developed in the Federal Republic of Germany, was reviewed from a United States Safety and Licensing perspective. The primary concepts considered were the steam cycle electric generating pebble bed (HTR-K) and the process heat pebble bed (PNP), although generic consideration of the direct cycle gas turbine pebble bed (HHT) was included. The study examines potential U.S. licensing issues and offers some suggestions as to required development areas

  3. More than a House of Cards: Developing a Firm Foundation for Streaming Media and Consumer-Licensed Content in the Library

    Directory of Open Access Journals (Sweden)

    William Cross

    2016-09-01

    Full Text Available This article will introduce traditional library practice for licensing multimedia content and discuss the way that consumer-licensing and streaming services disrupt that practice. Sections II and III describe the statutory copyright regime designed by Congress to facilitate the socially-valuable work done by libraries and the impact of the move from ownership to licensed content. Collecting multimedia materials has always presented special legal challenges for libraries, particularly as licensed content has replaced the traditional practice of purchasing and circulation based on the first sale doctrine. These issues have grown even more complex as streaming services like Netflix and Amazon and video game downloads through services like Steam have come to dominate the landscape. Section IV will describe the way that consumer-licensed materials, which not only remove the ownership that undergirds library practice, but also the ability to negotiate for library use, imperil the congressionally-designed balance. Section V will present a path forward for libraries to develop robust, cutting-edge collections that reflect a sophisticated understanding of the contractual and copyright issues at play.

  4. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Wei-Whua Loa; Suan Chen; Wei-Chu Yu

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal of High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated, because too many factors must be taken into consideration. For the time being, licensing review is as much an art as it is a science. The authority usually faces three major problems; (1) the availability of domain expert, (2) maintaining of high quality and consistent reviews, and (3) the documentation of the review process. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper we will discuss the development of the radioactive waste management licensing review assistant

  5. 76 FR 55723 - Final Supplemental Environmental Impact Statement, Sequoyah Nuclear Plant Units 1 and 2 License...

    Science.gov (United States)

    2011-09-08

    ...-basis accident or severe accident is minor, and that the results of such accidents continue to be... the Fukushima accident is unlikely to occur at any TVA plant. Nonetheless, the effort has resulted in... the Fukushima Dai-ichi Accident, concluded that continued operation and continued licensing activities...

  6. License - DGBY | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available rch Institute, National Agriculture and Food Research Organization (NARO) 2-1-12 Kannondai, Tsukuba, Ibaraki...t a license for use of this database or any part thereof not licensed under the license. National Food Resea

  7. License - Dicty_cDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Dicty_cDB License to Use This Database Last updated : 2010/02/15 You may use this database i...w. The Standard License specifies the license terms regarding the use of this database and the requirements ...you must follow in using this database. The Additional License specifies those it...dard License The Standard License for this database is the license specified in the Creative Commons Attribu...tion-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  8. Progress in licensing ITER in Cadarache

    International Nuclear Information System (INIS)

    Rodriguez-Rodrigo, Lina; Girard, Jean-Philippe; Uzan-Elbez, Joelle; Marbach, Gabriel; Garin, Pascal; Rosanvallon, Sandrine

    2005-01-01

    The licensing procedure for ITER in Europe in the framework of the French regulations is a non-prescriptive approach based on a continuous dialogue between the nuclear installation owner (or its representative) and the safety authority. In this paper, the licensing procedure and main safety issues, which are being studied in this process, are presented

  9. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  10. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  11. Medical review practices for driver licensing volume 3: guidelines and processes in the United States.

    Science.gov (United States)

    2017-04-01

    This is the third of three reports examining driver medical review practices in the United States and how : they fulfill the basic functions of identifying, assessing, and rendering licensing decisions on medically or : functionally at-risk drivers. ...

  12. Licensing of New Nuclear Power Plants in Canada

    International Nuclear Information System (INIS)

    Schwarz, Garry; Miller, Doug

    2011-01-01

    The regulatory process for new power plant licensing in Canada, from receipt of the initial application to commercial operation, can be divided into three phases: - Environmental Assessment (EA) and License to Prepare Site; - License to Construct; and - License to Operate. The Nuclear Safety and Control Act (NSCA) does not have provisions for combined licenses for site preparation, construction, or operation. Separate licenses must, therefore, be granted for each phase, and would be issued in sequence. However, applications to prepare a site, to construct and to operate a new nuclear power plant could be assessed in parallel. The total duration from the application for the License to Prepare Site to the issuance of the License to Operate (which is a prerequisite for first fuel load) has been established as 9 years subject to certain factors. To help facilitate this timeline, the CNSC has undertaken an aggressive program of documenting regulatory practices, requirements and guidance to assist applicants in submitting complete applications. Working level procedures to assist CNSC staff in their review of submissions are also under development. Extensive program and project management has been introduced to ensure that timelines will be achieved. In parallel with the above activities, regulatory oversight measures to be employed during site preparation activities and plant construction and commissioning are also being developed. On the international front, the CNSC is participating in the MDEP program to leverage the resources and knowledge of other national regulatory authorities in reviews the CNSC is undertaking. The CNSC also participates in IAEA and other international activities to utilize/adapt international practices as appropriate in Canada. (authors)

  13. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Loa, W.W.; Chen, S.; Yu, W.C.; Peng, C.M.; Huang, C.L.; Lin, C.

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal fo High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated because too many factors must be taken into consideration. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper the authors will discuss the development of the radioactive waste management licensing review assistant

  14. The licensing support system (LSS): Who should operate it and will it work?

    International Nuclear Information System (INIS)

    Macnabb, M.L.; Pflum, C.

    1991-01-01

    The development of the mammoth Licensing Support System (LSS), a management information system intended to handle documentation relevant to the licensing application of the DOE for the High Level Nuclear Waste Repository is not conforming to statute, regulation or intent. At the present stage of its development, it is a quagmire of legal, regulatory and technical difficulties which has the DOE and the NRC arguing over its implementation and budget. This paper examines some of the failures of the system and concludes that many of the DOE functions should now be transferred to a disinterested and independent third party under the auspices of the NRC in order to meet the intent of its creators

  15. 48 CFR 1852.227-86 - Commercial computer software-Licensing.

    Science.gov (United States)

    2010-10-01

    .../contractor proposes its standard commercial software license, those applicable portions thereof consistent... its standard commercial software license until after this purchase order/contract has been issued, or at or after the time the computer software is delivered, such license shall nevertheless be deemed...

  16. The current role of simulators for performance evaluations and licensing (case of Mexico)

    International Nuclear Information System (INIS)

    Maldonado A, H.

    1997-01-01

    The main purpose of this paper is to share the experience acquired by the National Commission of Nuclear Safety and Safeguards (CNSNS) during the administration of both certification and licensing operational exams applied to Senior Reactor Operators (SRO) and Reactor OPerators (RO) by using a full-scope simulator. The licensing operational exams are administered to examinate candidates for a SRO or RO license while the certification operational exams are administered to all personnel that possess a SRO or RO license in order to renew their licenses within a six years period. A general description with the most important simulator antecedents from the initial authorization for its usage to provide the ''Initial Simulator Training Course'' until currently in which it has been started the installation and testing performance of a new computer equipment that will improve and increase the simulation capacity of the Laguna Verde Nuclear Power Plant (LVNPP) simulator. In other hand, it is showed the process that the CNSNS will apply during the next verification of the simulator certification which should be performed due to the old computer equipment is being replaced with a more modern computer equipment so that the simulation capability will be improved. The verification process was discussed with the utility personnel and as result of this an agreement has been established to carry into effect this hard task. Finally, the conclusions and recommendations from regulators point of view are presented regarding to the importance of perform a well both evaluation and verification of simulators performance. (author)

  17. Operating reactors licensing actions summary. Vol. 3, No. 3

    International Nuclear Information System (INIS)

    1983-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regularory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  18. Nurse Bullying: Impact on Nurses' Health.

    Science.gov (United States)

    Sauer, Penny A; McCoy, Thomas P

    2017-12-01

    Workplace bullying has been experienced by 27% to 80% of nurses who have participated in studies. Bullying behaviors negatively impact the health of nurses. This study examined whether nurses' resilience had an impact on the effects of bullying on the nurse's health. This cross-sectional descriptive study surveyed licensed registered nurses in one state. The sample ( N = 345) was predominately female (89%) and Caucasian (84%), with an average age of 46.6 years. In this sample, 40% of nurses were bullied. Higher incidence of bullying was associated with lower physical health scores ( p = .002) and lower mental health scores ( p = .036). Nurses who are bullied at work experience lower physical and mental health, which can decrease the nurses' quality of life and impede their ability to deliver safe, effective patient care.

  19. Licensed bases management for advanced nuclear plants

    International Nuclear Information System (INIS)

    O'Connell, J.; Rumble, E.; Rodwell, E.

    2001-01-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  20. Licensed bases management for advanced nuclear plants

    Energy Technology Data Exchange (ETDEWEB)

    O' Connell, J [Duke Engineering and Services, Marlborough, MA (United States); Rumble, E; Rodwell, E [EPRI, Palo Alto, CA (United States)

    2001-07-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  1. Atomic Safety and Licensing Board Panel annual report

    International Nuclear Information System (INIS)

    1991-09-01

    In Fiscal Year 1990, The Atomic Safety and Licensing Board Panel (Panel) handled 40 proceedings involving the construction, operation, and maintenance of commercial nuclear power reactors or other activities requiring a license from the Nuclear Regulatory Commission. This report summarizes, highlights, and analyzes how the judges and licensing boards of the Panel addressed the wide-ranging issues raised in these proceedings during the year

  2. The road to MYRRHA. The pre-licensing phase and FEED

    International Nuclear Information System (INIS)

    2014-01-01

    The article discusses the study phase of the future research reactor MYRRHA. This study phase covers three major areas: Research and Development, licensing and engineering. In 2013, substantial progress was made in the licensing and engineering processes: licensing is currently in the pre-licensing phase, while, for engineering, the Front-end Engineering and Design (FEED) contract was signed for the construction of the non-nuclear parts of MYRRHA. The article highlights work associated with the the pre-licensing phase and the FEED.

  3. Comparative assessment of licensing processes of uranium mines in Brazil

    International Nuclear Information System (INIS)

    Silva, K.M.; Menezes, R.M.; Mezrahi, A.

    2002-01-01

    Commercial operation of uranium mining and milling started in Brazil, at the Pocos de Caldas Unit, State of Minas Gerais, in 1982. The Pocos de Caldas Unit was licensed by the Brazilian Regulatory Body (CNEN) and its is now in the decommissioning process. In 2000, a new mining and milling installation, the Caetite Unit, located in State of Bahia, started operation. This paper will discuss how Brazilian Nuclear Energy Commission is licensing the Caetite Unit based on the lessons learned from the Pocos de Caldas Unit. The objective is to draw attention to the importance of the safety assessment for a new unit, specially considering that some wrong decisions were taken for the Pocos de Caldas unit. These decisions lead to less effective long term solutions to protect the environment. Notwithstanding the differences between the two units, it is of great value to use the acquired experience to avoid or minimize the short, medium and long term impacts to the environment and population in the new operation. (author)

  4. The effect of preceptor role effectiveness on newly licensed registered nurses' perceived psychological empowerment and professional autonomy.

    Science.gov (United States)

    Watkins, Chanell; Hart, Patricia L; Mareno, Nicole

    2016-03-01

    The first year turnover rate for newly licensed registered nurses is roughly 30% and increases to about 57% in the second year (Twibell et al., 2012). An effective preceptorship has been shown to better facilitate the first year transition (Hodges et al., 2008) and increase retention rates (Pine and Tart, 2007). The purpose of this study was to examine the relationships between newly licensed registered nurses' perceived preceptor role effectiveness, psychological empowerment and professional autonomy. A prospective, cross-sectional, descriptive research design was used. Sixty-nine newly licensed registered nurses were recruited and surveyed. Newly licensed registered nurses were found to have moderately high levels of perceived preceptor role effectiveness, psychological empowerment, and professional autonomy. Preceptor role effectiveness had significant, moderately, positive relationships with professional autonomy and psychological empowerment. There was also a significant relationship found between professional autonomy and psychological empowerment. Results show that preceptor role effectiveness is linked to increased professional autonomy and psychological empowerment. Therefore, effective preceptorships are necessary in easing the newly licensed registered nurse's transition to practice. Strategies to ensure effective preceptorships and enhance the NRLN's transition to practice are proposed. Copyright © 2016 Elsevier Ltd. All rights reserved.

  5. 75 FR 81628 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-12-28

    ... National Institute of Diabetes and Digestive and Kidney Disease (NIDDK), part of the National Institute of... 2010 (HHS Reference No. E-116-2010/0-US-01). Licensing Status: Available for licensing. Licensing...; [email protected] . Collaborative Research Opportunity: The National Institute of Diabetes and...

  6. 48 CFR 52.227-19 - Commercial Computer Software License.

    Science.gov (United States)

    2010-10-01

    ... Software License. 52.227-19 Section 52.227-19 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.227-19 Commercial Computer Software License. As prescribed in 27.409(g), insert the following clause: Commercial Computer Software License (DEC 2007) (a) Notwithstanding any contrary provisions...

  7. License - Yeast Interacting Proteins Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Yeast Interacting Proteins Database License to Use This Database Last updated : 2010/02/15 You may use this database...nal License described below. The Standard License specifies the license terms regarding the use of this database... and the requirements you must follow in using this database. The Additional ...the Standard License. Standard License The Standard License for this database is the license specified in th...e Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database

  8. The construction of irradiated material examination facility

    International Nuclear Information System (INIS)

    Ro, Seung Gy; Lee, Key Soon; Herr, Young Hoi

    1990-03-01

    A detail design of the examination process, the hot cell facility and the annexed facility of the irradiated material examination facility (IMEF) which will be utilized to examine and evaluate physical and mechanical properties of neutron-irradiated materials, has been performed. Also a start-up work of the underground structure construction has been launched out. The project management and tasks required for the license application were duly carried out. The resultant detail design data will be used for the next step. (author)

  9. A Post Licensing Study of Community Effects at Two Operating Nuclear Power Plants. Final Report.

    Science.gov (United States)

    Purdy, Bruce J.; And Others

    In an effort to identify and assess the social, economic, and political effects of nuclear power plant construction and operation upon two host communities (Plymouth, Massachusetts and Waterford, Connecticut), a post-licensing review revealed that the primary impact of the nuclear power plants in both communities was an increase in the property…

  10. Age vs. experience : evaluation of a video feedback intervention for newly licensed teen drivers.

    Science.gov (United States)

    2013-02-06

    This project examines the effects of age, experience, and video-based feedback on the rate and type of safety-relevant events captured on video event : recorders in the vehicles of three groups of newly licensed young drivers: : 1. 14.5- to 15.5-year...

  11. Socio-economic impacts of nuclear generating stations

    International Nuclear Information System (INIS)

    Weisiger, M.L.; Pijawka, K.D.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the St. Lucie nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  12. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  13. Licensing process for future applications of advanced-design nuclear reactors

    International Nuclear Information System (INIS)

    Miller, C.L.

    1990-01-01

    The existing 10CFR50 two-step licensing process in the Code of Federal Regulations can continue to be a viable licensing vehicle for future applications, at least for the near future. The US Nuclear Regulatory Commission (NRC) Commissioners and staff, the public, and the utilities (along with supporting architect/engineers and nuclear steam supply system vendors) have a vast body of experience and knowledge of the existing part 50 licensing process. All these participants are familiar with their respective roles in this process, and history shows this process to be a workable licensing vehicle. Nevertheless, the use of 10CFR52 should be encouraged for future applications. This proposed new rule is intended to achieve the early resolution of licensing issues, to reduce the complexity and uncertainty of the licensing process, and enhance the safety and reliability of nuclear power plants. Part 52's overall purpose is to improve reactor safety and streamline the licensing process by encouraging the use of standard reactor designs and by allowing the early resolution of site environmental and reactor safety issues. The public should be afforded an earlier entry into the licensing process as a result of design certification rulemaking process and combined construction permit/operating license hearings

  14. MATLAB Software Versions and Licenses for the Peregrine System |

    Science.gov (United States)

    High-Performance Computing | NREL MATLAB Software Versions and Licenses for the Peregrine System MATLAB Software Versions and Licenses for the Peregrine System Learn about the MATLAB software Peregrine is R2017b. Licenses MATLAB is proprietary software. As such, users have access to a limited number

  15. LicenseScript: A Logical Language for Digital Rights Management

    NARCIS (Netherlands)

    Chong, C.N.; Corin, R.J.; Doumen, J.M.; Etalle, Sandro; Hartel, Pieter H.; Law, Y.W.; Tokmakoff, Andrew

    We propose LicenseScript, a language for digital rights management (DRM) based on multiset rewriting and logic programming. LicenseScript enjoys a precise syntax and semantics, and it is rich enough to embed other rights expression languages (REL). We show that LicenseScript is expressive and

  16. Greenland unveils terms for offshore licenses

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Greenland has spelled out terms for its first round of offshore licensing. The action off western Greenland could lead to the first oil and gas exploration there since an unsuccessful campaign in the 1970s. The Mineral Resources Administration (MRA) for Greenland pegged exploration license terms on 133 blocks, all south of the 66th parallel, at 10 years with options for 2 year extensions to a maximum of 6 more years. The license can cover as many as six blocks. In the first 3 year period companies will have only a seismic obligation of 1,588 km per six blocks. For the second 3 year period there will be a one well obligation and one well in each subsequent 2 year periods

  17. Performance during internal medicine residency training and subsequent disciplinary action by state licensing boards.

    Science.gov (United States)

    Papadakis, Maxine A; Arnold, Gerald K; Blank, Linda L; Holmboe, Eric S; Lipner, Rebecca S

    2008-06-03

    Physicians who are disciplined by state licensing boards are more likely to have demonstrated unprofessional behavior in medical school. Information is limited on whether similar performance measures taken during residency can predict performance as practicing physicians. To determine whether performance measures during residency predict the likelihood of future disciplinary actions against practicing internists. Retrospective cohort study. State licensing board disciplinary actions against physicians from 1990 to 2006. 66,171 physicians who entered internal medicine residency training in the United States from 1990 to 2000 and became diplomates. Predictor variables included components of the Residents' Annual Evaluation Summary ratings and American Board of Internal Medicine (ABIM) certification examination scores. 2 performance measures independently predicted disciplinary action. A low professionalism rating on the Residents' Annual Evaluation Summary predicted increased risk for disciplinary action (hazard ratio, 1.7 [95% CI, 1.3 to 2.2]), and high performance on the ABIM certification examination predicted decreased risk for disciplinary action (hazard ratio, 0.7 [CI, 0.60 to 0.70] for American or Canadian medical school graduates and 0.9 [CI, 0.80 to 1.0] for international medical school graduates). Progressively better professionalism ratings and ABIM certification examination scores were associated with less risk for subsequent disciplinary actions; the risk ranged from 4.0% for the lowest professionalism rating to 0.5% for the highest and from 2.5% for the lowest examination scores to 0.0% for the highest. The study was retrospective. Some diplomates may have practiced outside of the United States. Nondiplomates were excluded. Poor performance on behavioral and cognitive measures during residency are associated with greater risk for state licensing board actions against practicing physicians at every point on a performance continuum. These findings support

  18. The law governing the nuclear licensing procedure in Brazil and in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Andrade Da Costa Lima, W.

    1984-01-01

    The two first parts of this thesis separately describe the framework of the legal system of the two countries in the field of nuclear energy, whereas the third part goes into details which are explained in order to prepare the subsequent comparative analysis. The comparison covers the structural set-up of the bodies of the national atomic energy provisions, the structure of the various nuclear licensing procedures, the role and competences of experts and their opinions, and the role and competence of jurisdiction. The most profound difference is found in the fact that Brazilian administrative law does not include jurisdiction of an administrative court, and this for constitutional reasons. The civil courts only have competence to examine acts of administration with regard to their legality. The procedure for licensing nuclear installations or equipment is determined by the central licensing authority within the framework of its competency. So far, there have been no attempts in Brazil to seek judicial remedy or to start an action to set aside decisions taken in the nuclear licensing procedure. Furthermore, there are no means in Brazilian law to stop licensing whenever the requirements of Art. 7, section 1, no. I-IV of Lei 6189 are met. The licensing authority has no scope of discretion. Applicants for a licence in Brazil will have no problems in finding out which regulations are applicable to their particular case. The concrete definition of details, however, always is a time-consuming and expensive process. (orig./HSCH) [de

  19. License - CREATE portal | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us CREATE portal License License to Use This Database Last updated : 2016/03/16 You may use this database... the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribu...tion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...hare Alike 4.0 International is found here . With regard to this database, you are licensed to: freely acces

  20. 10 CFR 51.107 - Public hearings in proceedings for issuance of combined licenses; limited work authorizations.

    Science.gov (United States)

    2010-01-01

    ... resolved in the early site permit proceeding; or (3) Raises any issue involving the impacts of construction... license hearing shall not admit contentions proffered by any party concerning severe accident mitigation... construction and operation of a nuclear power plant, and a construction permit was issued but construction of...

  1. Changing mobility patterns and road mortality among pre-license teens in a late licensing country: an epidemiological study.

    Science.gov (United States)

    Twisk, Divera; Bos, Niels; Shope, Jean T; Kok, Gerjo

    2013-04-11

    Whereas the safety of teens in early licensing countries has been extensively studied, little is known about the safety of pre-license teens in late licensing countries, where these teens also may be at risk. This risk exists because of the combination of a) increasing use of travel modes with a high injury risk, such as bicycles and mopeds, b) inexperience, and c) teens' developmental stage, known to be associated with risk taking and novelty seeking, especially among males. To explore the magnitude and nature of pre-license road risk, this study analysed epidemiological data from the Netherlands, and hypothesized that in this late licensing country, 'independent travel' and the use of riskier modes of transport increase among pre-license teens 10 to 17 years of age, resulting in higher fatality rates, with 'experience' and 'gender' as risk modifying factors. National travel and fatality data of pre-license adolescents in the Netherlands were analysed by traffic role (cyclist, pedestrian, car passenger and moped rider), and compared to a younger age group (0-9 years) and an older age group (18+ years). The study of travel data showed that teens migrate from being car occupants to being users of riskier modes of transport, specifically bicycles and mopeds. This migration resulted in a strong rise in road fatalities, illustrating the importance of mobility patterns for understanding changes in road fatalities in this age group. The data further suggested a protective role of early cycle experience for young adolescent cyclists, particularly for young males. But further study into the underlying mechanism is needed to confirm this relationship. Moped risk was extremely high, especially among young males, and even higher than that of young male car drivers. The study confirmed the importance of changes in mobility patterns for understanding the rising road mortality when youngsters enter into their teens. The focus on fatalities has led to an underestimation of the

  2. Renewal of operating licenses: the U.S. model

    International Nuclear Information System (INIS)

    Petroll, M.; Tveiten, B.

    2006-01-01

    Nearly half of the American nuclear power plants by now have been granted permits allowing them to be operated for twenty years more than originally planned. Procedures to this effect are under way for one quarter of U.S. nuclear power plants. For the operators, plant life extension, as a rule, is economically preferable to building new baseload plants or buying electricity from other sources. In the licensing procedures, the U.S. regulatory authority examines both environmental aspects and safety aspects of extended operation. The technical basis of assessment is the GALL report (Generic Aging Lessons Learnt) which by now has become the consolidated yardstick used by the authorities for safety assessment. In these procedures, the licensee is required to present updated design documents and, if applicable, extend or create from scratch programs of aging management. The case of the oldest nuclear power plant in operation in the United States is described to show the steps of an American licensing and administrative court procedure. Granting renewed operating permits began before President Bush's term and will continue independent of the change in government in 2008. (orig.)

  3. Operating reactors licensing actions summary. Vol. 3, No. 6

    International Nuclear Information System (INIS)

    1983-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  4. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  5. Licensed bases management for advanced nuclear plants

    Energy Technology Data Exchange (ETDEWEB)

    O' Connell, J. [Duke Engineering and Services, Marlborough, MA (United States); Rumble, E.; Rodwell, E. [EPRI, Palo Alto, CA (United States)

    2001-07-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  6. A Real-time License Plate Detection System for Parking Access

    Directory of Open Access Journals (Sweden)

    Roenadi Koesdijarto

    2010-08-01

    Full Text Available The automatic and real-time license plate detection system can be used as an access control entry of vehicles into the parking area. The problem is how to recognize the vehicles that will go into the parking lot and how to recognize various types of license plates in various light conditions quickly and accurately. In this research, the prototype was developed with a detection system to recognize the vehicles that will enter the parking area, and a license plate recognition system. In the license plate recognition system, the Fourier transform and Hidden Markov model method have proposed to detect location of license plate and as characters segmentation to recognize Indonesia license plates. The research results have shown that the developed prototype system has successfully recognized all Indonesia license plates in several of light condition and camera position. The percentage of plate recognition in the real-time experiment is 84.38%, and the average execution time for all recognition process is 5.834 second.

  7. Integration of MGDS design into the licensing process

    International Nuclear Information System (INIS)

    1997-12-01

    This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design for a potential repository is integrated into the licensing process. The integration process employs a two-told approach: (1) ensure that the MGDS design complies with applicable Nuclear Regulatory Commission (NRC) licensing requirements, and (2) ensure that the MGDS design is appropriately reflected in a license application that is acceptable to the NRC for performing acceptance and compliance reviews

  8. License - Metabolonote | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Metabolonote License License to Use This Database Last updated : 2016/06/22 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...e Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database

  9. 78 FR 20106 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-04-03

    ... M. Tsai, President (QI). Application Type: New NVO License. American International Shipping Company... Type: New NVO License. Nippon Concept America, LLC (OFF), 2203 Timberloch Place, Suite 218D, The...

  10. 15 CFR 732.4 - Steps regarding License Exceptions.

    Science.gov (United States)

    2010-01-01

    ... General Prohibition Six (Embargo), consult part 746 of the EAR for applicable License Exceptions. (b... export or reexport is subject to General Prohibition Six (Embargo) for embargoed destinations, License...

  11. Environmental impact appraisal for renewal of Special Nuclear Material License No. SNM-1097 (Docket No. 70-1113)

    International Nuclear Information System (INIS)

    1984-06-01

    The proposed action, the full 5-year renewal of License SNM-1097, is necessary for GE to continue producing fuel used in light-water nuclear reactors. The fuel manufacturing operation principally involves converting UF 6 to UO 2 powder, pressing the UO 2 powder into pellets, sintering and grinding the pellets, loading the pellets into Zircaloy tubes, and then assembling the loaded tubes into fuel bundles. A variety of radiological and nonradiological gaseous, liquid, and solid wastes are generated. After treatment, some of the wastes are released to the environment. In addition to the nuclear fuel fabrication operation, there are other operations performed at GE which do not require NRC licensing (e.g., zirconium metal processing, production of fuel bundle and mechanical reactor components, and the manufacture of aircraft engine parts) and are not associated with the proposed action. 28 references, 15 figures, 21 tables

  12. 48 CFR 1852.225-70 - Export Licenses.

    Science.gov (United States)

    2010-10-01

    ... writing, that the Contracting Officer authorizes it to export ITAR-controlled technical data (including... licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance. (b) The Contractor shall be responsible for obtaining export licenses, if...

  13. Licensing of HTGRs in the United States

    International Nuclear Information System (INIS)

    Fisher, C.R.; Orvis, D.D.

    1981-01-01

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented. (author)

  14. Generational differences among newly licensed registered nurses.

    Science.gov (United States)

    Keepnews, David M; Brewer, Carol S; Kovner, Christine T; Shin, Juh Hyun

    2010-01-01

    Responses of 2369 newly licensed registered nurses from 3 generational cohorts-Baby Boomers, Generation X, and Generation Y-were studied to identify differences in their characteristics, work-related experiences, and attitudes. These responses revealed significant differences among generations in: job satisfaction, organizational commitment, work motivation, work-to-family conflict, family-to-work conflict, distributive justice, promotional opportunities, supervisory support, mentor support, procedural justice, and perceptions of local job opportunities. Health organizations and their leaders need to anticipate intergenerational differences among newly licensed nurses and should provide for supportive working environments that recognize those differences. Orientation and residency programs for newly licensed nurses should be tailored to the varying needs of different generations. Future research should focus on evaluating the effectiveness of orientation and residency programs with regard to different generations so that these programs can be tailored to meet the varying needs of newly licensed nurses at the start of their careers. Copyright 2010 Mosby, Inc. All rights reserved.

  15. Licensing of HTGRs in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, C. R.; Orvis, D. D. [General Atomic Co., San Diego, CA (USA)

    1981-01-15

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented.

  16. License - Society Catalog | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Society Catalog License License to Use This Database Last updated : 2012/01/17 You may use this database...es the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attri...bution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as...is found here . With regard to this database, you are licensed to: freely access part or whole of this database

  17. The Licensing of New Nuclear Power Plants in Europe

    International Nuclear Information System (INIS)

    Raetzke, C.

    2008-01-01

    After an introduction dealing with the nuclear Renaissance in Europe and the specific situation of Germany and of Italy, the article focuses on the question of licensing processes for new reactors. New nuclear power plant projects involve a substantial investment and electric utilities will only take this decision if the licensing and regulatory risk can be adequately managed. Licensing processes should be predictable and efficient in order to give sufficient assurance to applicants. The article discusses best practice in licensing by giving some examples of suitable licensing processes of other countries. It also highlights international initiatives aimed at harmonizing safety requirements for new reactors and a multinational cooperation in reactor design review. These issues should be carefully considered by any country wanting to get new nuclear started. [it

  18. Licensing biotech intellectual property in university-industry partnerships.

    Science.gov (United States)

    Drozdoff, Vladimir; Fairbairn, Daryl

    2015-01-20

    Appropriate negotiation and drafting of license agreements are critical to successfully establishing and managing the expansive and complex relationships that are becoming more common between industry and universities. More often than not, the resulting licensing agreements become quite lengthy and complex, and the key principles become difficult to discern among all the details. This summary provides a short, nonexhaustive introduction to some of the essential components of these licenses with the intent of providing the non-licensing professional a better appreciation of some of the key commercial and legal terms from both an academic and company perspective, keeping in mind some of the considerations that particularly apply to biotechnology deals. Copyright © 2015 Cold Spring Harbor Laboratory Press; all rights reserved.

  19. The licensing of nuclear power plants in Brazil

    International Nuclear Information System (INIS)

    Lederman, L.

    1980-01-01

    In Brazil the governmental organization responsible for the licensing of NPPs is the Comissao Nacional de Energia Nuclear (CNEN), the Brazilian Regulatory Body. A description of CNEN's organization, responsabilities and working methods, as well as the present situation of the Brazilian NPPs undergoing licensing, has recently been presented. In this paper the experience gained by CNEN in the course of licensing Brazilian NPPs Units I and II is discussed. CNEN's present day technical competence and its future trends are analysed with regard to in-house capacity, foreign consultants and research contracts with Brazilian Universities. Finally, the immediate need for a Safety research programm in support of licensing is discussed. Manpower needs and major areas for such a programm are also indicated. (orig./RW)

  20. The Nightmare of the Leader: The Impact of Deregulation on an Oligopoly Insurance Market

    OpenAIRE

    Jennifer L. Wang; Larry Y. Tzeng; En-Lin Wang

    2003-01-01

    This paper explores the impact of deregulation of licensing on an oligopoly insurance market. We show that deregulation of licensing in a Stackelberg-type oligopoly market may not have any impact on the leader’s output if the number of firms increases but the market structure remains. On the other hand, if the market structure is reorganized because of the deregulation of licensing, the leader’s output could be significantly reduced after deregulation. By using the unique data of the insuranc...

  1. 77 FR 64992 - Ocean Transportation Intermediary License Reissuances

    Science.gov (United States)

    2012-10-24

    ..., Kenner, LA 70062. Date Reissued: August 15, 2012. License No.: 020088N. Name: Hal-Mari International... 91754. Date Reissued: September 5, 2012. License No.: 019372F. Name: Hal-Mari International Logistics...

  2. 77 FR 40882 - Ocean Transportation Intermediary License; Revocations

    Science.gov (United States)

    2012-07-11

    ...: Voluntarily surrendered license. License Number: 021243NF. Name: Cargo Logistics & Trade Solutions, Limited Liability Company. Address: 13367 NW 47th Avenue, Opa Locka, FL 33054. Date Revoked: May 26, 2012. Reason...

  3. 13 CFR 107.1900 - Surrender of license.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Surrender of license. 107.1900 Section 107.1900 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS INVESTMENT COMPANIES Ending Operations as a Licensee § 107.1900 Surrender of license. You may not surrender your...

  4. 22 CFR 120.21 - Manufacturing license agreement.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Manufacturing license agreement. 120.21 Section... DEFINITIONS § 120.21 Manufacturing license agreement. An agreement (e.g., contract) whereby a U.S. person grants a foreign person an authorization to manufacture defense articles abroad and which involves or...

  5. Licensing activities for advanced reactors in NNC

    International Nuclear Information System (INIS)

    Chevalier, A.B.H.; Mustoe, J.; Walters, J.; Ingham, E.L.

    2001-01-01

    NNC has been involved in safety and licensing activities for advanced reactors for many years. Most recently NNC has been involved with national regulators or their representatives for the HTR (High Temperature Reactor) reactor and the possible siting of ITER (International Thermonuclear Experimental Reactor) within Europe. Commonalties between the two activities can be seen, even though one is a fission process and the other based on a completely new technology. Both have the potential to generate power at a very low overall exposure to the public and station staff, but both also need to demonstrate to the regulator the safety of a design which differs from the standard LWR practice. In both concepts passive design features provide a major part of the safety argument, but the detailed assessment and justification of these features in licensing terms still needs to be made. A number of critical safety issues can be identified, which generally apply to any advanced system. These are: Safety categorization, codes and standards; confinement or containment; ALARA; safety code modelling and data; Occupational Exposure; occupational exposures; decommissioning and waste; no evacuation, or no emergency plans. The UK is notable for a flexible licensing regime, which allows a safety case to be built up from first principles, where this is applicable. In addition, experience of licensing gas cooled, water cooled and liquid metal plant, as well as extensive experience outside the UK provides NNC with a unique insight into the different licensing methodologies which can be applied in the licensing process. This paper discusses some possible approaches which could be applied in order to satisfy regulatory demands when addressing the critical issues listed above. (author)

  6. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  7. Experience acquired by Furnas for licensing nuclear power plants

    International Nuclear Information System (INIS)

    Silva, A.J.C. da; Xavier, E.E.

    1986-01-01

    The system for licensing of Almirante Alvaro Alberto Nuclear Power Plant-Unit 1 is presented. The process phases for reactor construction and operation are described: preliminary site approval; bases for safety review; partial construction permits; final construction permits; emission of final report of safety analysis; initial operation license and permanent operation license. (M.C.K.) [pt

  8. The need for review of environmental licensing rules taking into accounts innovations in the area of onshore seismic data acquisition; A necessidade de revisao das regras de licenciamento ambiental considerando inovacoes na area de aquisicao de dados sismicos terrestres

    Energy Technology Data Exchange (ETDEWEB)

    Vieira, Victor M. [Faculdade de Tecnologia e Ciencias - FTC, Salvador, BA (Brazil); Stilgoe, George [GeoDynamics Brasil Ltda., Rio de Janeiro, RJ (Brazil); Ferreira, Doneivan F. [Universidade Federal da Bahia (UFBA), Salvador, BA (Brazil). Dept. de Geologia e Geofisica Aplicada

    2008-07-01

    Activities involving seismic data acquisition aimed at the exploration, characterization, and monitoring of onshore oil and gas fields are expected to cause environmental impacts. Therefore, all seismic-related activities which require the use of traditional technologies must be licensed beforehand. The environmental licensing process is complex and subjected to interruptions and delays which will affect project schedule and cash flow. Some innovations in this field and other alternative techniques will allow data acquisition with reduced or insignificant environmental impacts. Within this context, the present paper proposes a description of the current onshore seismic acquisition techniques commonly used and their potential environmental impacts; presents and describes the innovative technique known as Infrasonic Passive Differential Spectroscopy (IPDS); and proposes a regulatory model which will allow a simplified licensing process. Additionally, this paper considers some positive impacts of regulatory flexibility, including: the possibility of using innovative techniques to fulfill obligations under the ANP Initial Work Program (PTI); time and cost reduction within the environmental licensing process; potential impacts on the recently-created market of oil production in fields with marginal accumulations. (author)

  9. Licensing systems and inspection of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    The first study analysing the regulations governing the licensing and inspection of nuclear installations in OECD countries was published by OECD/NEA in 1980, and revised in 1986. Since then there have been amendments to national regulations on the subject, which have warranted updating of this publication. This new study provides a description of the licensing regulations and practices applied in the twenty OECD countries with provisions in that field. The national systems have been described according to a standard format to make comparisons and research easier. In most cases, the descriptions are supplemented by flow charts illustrating the procedures and specifying the different authorities involved in the licensing procedures [fr

  10. LicenseScript: A Novel Digital Rights Language

    NARCIS (Netherlands)

    Chong, C.N.; Corin, R.J.; Etalle, Sandro; Hartel, Pieter H.; Law, Y.W.; Grimm, R.; Nitzel, J.

    We propose LicenseScript as a new multi-set rewriting/logic based language for expressing dynamic conditions of use of digital assets such as music, video or private data. LicenseScript differs from the other DRM languages in that it caters for the intentional but legal manipulation of data. We

  11. A Meta-Analytic Review of Moral Licensing

    NARCIS (Netherlands)

    Blanken, Irene; van de Ven, Niels; Zeelenberg, Marcel

    2015-01-01

    Moral licensing refers to the effect that when people initially behave in a moral way, they are later more likely to display behaviors that are immoral, unethical, or otherwise problematic. We provide a state-of-the-art overview of moral licensing by conducting a meta-analysis of 91 studies (7,397

  12. A meta-analytic review of moral licensing

    NARCIS (Netherlands)

    Blanken, I.; van de Ven, N.; Zeelenberg, M.

    2015-01-01

    Moral licensing refers to the effect that when people initially behave in a moral way, they are later more likely to display behaviors that are immoral, unethical, or otherwise problematic. We provide a state-of-the-art overview of moral licensing by conducting a meta-analysis of 91 studies (7,397

  13. 45 CFR 1321.75 - Licenses and safety.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Licenses and safety. 1321.75 Section 1321.75... AND COMMUNITY PROGRAMS ON AGING Service Requirements § 1321.75 Licenses and safety. The State shall... that the facility complies with all applicable State and local health, fire, safety, building, zoning...

  14. 21 CFR 515.20 - Approval of medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Approval of medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.20 Approval of medicated feed mill license applications. Within 90 days after an...

  15. 21 CFR 515.23 - Voluntary revocation of medicated feed mill license.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Voluntary revocation of medicated feed mill... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.23 Voluntary revocation of medicated feed mill license. A license issued under...

  16. 47 CFR 80.53 - Application for a portable ship station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.53 Application for a portable ship station license. The Commission may grant a license permitting operation of a...

  17. PROCESS FOR LICENSE APPLICATION DEVELOPMENT FOR THE GEOLOGIC REPOSITORY

    International Nuclear Information System (INIS)

    DOUGLAS M. FRANKS AND NORMAN C. HENDERSON

    1997-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the U.S. Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, (section)60.21ff and (section)60.31ff. This paper discusses the process the Yucca Mountain Site Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the ''Technical Guidance Document for Preparation of the License Application'' (TGD), currently in development

  18. Process for license application development for the geologic repository

    International Nuclear Information System (INIS)

    Franks, D.M.; Henderson, N.C.

    1998-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the US Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, section 60.21ff and section 60.31ff. This paper discusses the process the Yucca Mountain Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the Technical Guidance Document for Preparation of the License Application (TGD), currently in development

  19. Licensing experience of the HTR-10 test reactor

    International Nuclear Information System (INIS)

    Sun, Y.; Xu, Y.

    1996-01-01

    A 10MW high temperature gas-cooled test reactor (HTR-10) is now being projected by the Institute of Nuclear Energy Technology within China's National High Technology Programme. The Construction Permit of HTR-10 was issued by the Chinese nuclear licensing authority around the end of 1994 after a period of about one year of safety review of the reactor design. HTR-10 is the first high temperature gas-cooled reactor (HTGR) to be constructed in China. The purpose of this test reactor project is to test and demonstrate the technology and safety features of the advanced modular high temperature reactor design. The reactor uses spherical fuel elements with coated fuel particles. The reactor unit and the steam generator unit are arranged in a ''side-by-side'' way. Maximum fuel temperature under the accident condition of a complete loss of coolant is limited to values much lower than the safety limit set for the fuel element. Since the philosophy of the technical and safety design of HTR-10 comes from the high temperature modular reactor design, the reactor is also called the Test Module. HTR-10 represents among others also a licensing challenge. On the one side, it is the first helium reactor in China, and there are less licensing experiences both for the regulator and for the designer. On the other side, the reactor design incorporates many advanced design features in the direction of passive or inherent safety, and it is presently a world-wide issue how to treat properly the passive or inherent safety design features in the licensing safety review. In this presentation, the licensing criteria of HTR-10 are discussed. The organization and activities of the safety review for the construction permit licensing are described. Some of the main safety issues in the licensing procedure are addressed. Among these are, for example, fuel element behaviour, source term, safety classification of systems and components, containment design. The licensing experiences of HTR-10 are of

  20. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed