WorldWideScience

Sample records for license application project

  1. Overview of the earth mounded concrete bunker prototype license application project: Objectives and approach

    Energy Technology Data Exchange (ETDEWEB)

    Conner, J.E. [EG and G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.

    1989-11-01

    This paper presents an overview of the objectives and approach taken in developing the Earth-mounded Concrete Bunker Prototype License Application Project. The Prototype License Application Project was initiated by the Department of Energy`s National Low-Level Waste Management Program in early 1987 and completed in November 1988. As part of this project a prototype safety analysis report was developed. The safety analysis report evaluates the licensibility of an earth-mounded concrete bunker for a low-level radioactive waste (LLW) disposal facility located on a hypothetical site in the northeastern United States. The project required approximately five person-years and twenty months to develop.

  2. Overview of the earth mounded concrete bunker prototype license application project: Objectives and approach

    Energy Technology Data Exchange (ETDEWEB)

    Conner, J.E. [EG and G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.

    1989-11-01

    This paper presents an overview of the objectives and approach taken in developing the Earth-mounded Concrete Bunker Prototype License Application Project. The Prototype License Application Project was initiated by the Department of Energy`s National Low-Level Waste Management Program in early 1987 and completed in November 1988. As part of this project a prototype safety analysis report was developed. The safety analysis report evaluates the licensibility of an earth-mounded concrete bunker for a low-level radioactive waste (LLW) disposal facility located on a hypothetical site in the northeastern United States. The project required approximately five person-years and twenty months to develop.

  3. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  4. 9 CFR 102.3 - License applications.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false License applications. 102.3 Section... AGRICULTURE VIRUSES, SERUMS, TOXINS, AND ANALOGOUS PRODUCTS; ORGANISMS AND VECTORS LICENSES FOR BIOLOGICAL PRODUCTS § 102.3 License applications. (a) U.S. Veterinary Biologics Establishment License. (1)...

  5. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel;

    2006-01-01

    The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well....... Different National settings and traditional use of ocean space, as well as different levels of advance in terms of legislation and procedural effectiveness make it extremely difficult to set out implementation strategies for ocean wave energy technologies. The paper includes a brief experience review from...

  6. 18 CFR 16.9 - Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of...

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Applications for new... Section 16.9 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF... served on all competing applicants no later than the date specified in the notice issued under...

  7. Mock Site Licensing Demonstration Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Roop, R.D.

    1986-06-01

    The Mock Site Licensing Demonstration Project developed the Low-Level Radioactive Waste Siting Simulation, a role-playing exercise designed to facilitate the process of siting and licensing disposal facilities for low-level waste (LLW). This report describes the development, contant, and usefulness of the siting simulation. The simulation was designed by Harvard University's Program on Negotiation; it can be conducted at a workshop or conference, involves 14 or more participants, and requires about eight hours to complete. The simulation consists of two sessions. In the first, participants negotiate the selection of siting criteria, and in the second, a preferred site for a facility is chosen from three candidate sites. The project sponsored two workshops (in Boston, Massachusetts and Richmond, Virginia) in which the simulation was conducted for persons involved in planning for LLW. It is concluded that the siting simulation can be useful in three ways: (1) as a tool for information dissemination, (2) as a vehicle that can foste communication among parties in conflict, and (3) as a step toward consensus building and conflict resolution. The DOE National Low-Level Waste Management Program is now making the siting simulation available for use by states, regional compacts, and other organizations involved in development of LLW disposal facilities.

  8. 76 FR 40905 - Turnagain Arm Tidal Electric Energy Project; Notice of Intent To File License Application, Filing...

    Science.gov (United States)

    2011-07-12

    ... Energy Regulatory Commission Turnagain Arm Tidal Electric Energy Project; Notice of Intent To File...: Turnagain Arm Tidal Energy Corporation. e. Name of Project: Turnagain Arm Tidal Electric Energy Project. f... include on the first page, the project name, Turnagain Arm Tidal Electric Energy Project, and number...

  9. 78 FR 21930 - Aquenergy Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2013-04-12

    ... Energy Regulatory Commission Aquenergy Systems, Inc.; Notice of Intent To File License Application... Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: P-2428-004. c. Date Filed: November 11, 2012. d. Submitted by: Aquenergy...

  10. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...... pilot plants and exemplary presents the ongoing permitting process of the Wave Dragon in Wales. Comments on future park-scale application issues are made based on the present situation in different countries....

  11. 76 FR 30360 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-05-25

    ...] [FR Doc No: 2011-12969] FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License... Commission an application for a license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight... applications to amend an existing OTI license or the Qualifying Individual (QI) for a license....

  12. INTERNAL HAZARDS ANALYSIS FOR LICENSE APPLICATION

    Energy Technology Data Exchange (ETDEWEB)

    R.J. Garrett

    2005-02-17

    The purpose of this internal hazards analysis is to identify and document the internal hazards and potential initiating events associated with preclosure operations of the repository at Yucca Mountain. Internal hazards are those hazards presented by the operation of the facility and by its associated processes that can potentially lead to a radioactive release or cause a radiological hazard. In contrast to external hazards, internal hazards do not involve natural phenomena and external man-made hazards. This internal hazards analysis was performed in support of the preclosure safety analysis and the License Application for the Yucca Mountain Project. The methodology for this analysis provides a systematic means to identify internal hazards and potential initiating events that may result in a radiological hazard or radiological release during the repository preclosure period. These hazards are documented in tables of potential internal hazards and potential initiating events (Section 6.6) for input to the repository event sequence categorization process. The results of this analysis will undergo further screening and analysis based on the criteria that apply to the performance of event sequence analyses for the repository preclosure period. The evolving design of the repository will be re-evaluated periodically to ensure that internal hazards that have not been previously evaluated are identified.

  13. 76 FR 79682 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-12-22

    ... Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  14. 76 FR 7209 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-02-09

    ... Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  15. 76 FR 33757 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-06-09

    ... Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  16. 77 FR 6563 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-02-08

    ... Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  17. 76 FR 76411 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-12-07

    ... Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  18. 76 FR 62407 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-10-07

    ... Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  19. 76 FR 78007 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-12-15

    ... Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  20. 76 FR 28778 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-05-18

    ... Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  1. 77 FR 1936 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-01-12

    ... Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  2. 76 FR 12962 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-03-09

    .../Director, Application Type: New NVO & OFF License. ICT International Cargo Transport (USA) Inc. (NVO & OFF... applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  3. 77 FR 5013 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-02-01

    ..., Application Type: New NVO & OFF License. Iris International USA LLC (NVO), 94 Franklin Street, Haworth, NJ 07641, Officer: Chang Gil Kim, Member, (Qualifying Individual), Application Type: New NVO License Dated...

  4. 78 FR 57633 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-09-19

    ... Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel... OTI license or the Qualifying Individual (QI) for a licensee. Interested persons may contact...

  5. 78 FR 55698 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-09-11

    ... Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel... OTI license or the Qualifying Individual (QI) for a licensee. Interested persons may contact...

  6. 77 FR 61752 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-10-11

    ... Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel... existing OTI license or the Qualifying Individual (QI) for a licensee. Interested persons may contact...

  7. 78 FR 27238 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-05-09

    ... Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel... OTI license or the Qualifying Individual (QI) for a licensee. Interested persons may contact...

  8. 78 FR 40143 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-07-03

    ... Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel... OTI license or the Qualifying Individual (QI) for a licensee. Interested persons may contact...

  9. 77 FR 39707 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-07-05

    ... No: 2012-16473] FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License; Applicants... application for a license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF.... 40101). Notice is also hereby given of the filing of applications to amend an existing OTI license...

  10. 78 FR 20106 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-04-03

    ... Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel... OTI license or the Qualifying Individual (QI) for a licensee. Interested persons may contact...

  11. 78 FR 43202 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-07-19

    ... Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel... OTI license or the Qualifying Individual (QI) for a licensee. Interested persons may contact...

  12. 47 CFR 1.83 - Applications for radio operator licenses.

    Science.gov (United States)

    2010-10-01

    ... this chapter. (b) Application filing procedures for commercial radio operator licenses are set forth in... file applications for commercial radio operator licenses is contained in the bulletin “Commercial Radio... 47 Telecommunication 1 2010-10-01 2010-10-01 false Applications for radio operator licenses....

  13. 77 FR 56643 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-09-13

    ... Doc No: 2012-22498] FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants... Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight... given of the filing of applications to amend an existing OTI license or the Qualifying Individual...

  14. 77 FR 21559 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-10

    ... License. Global Distribution & Logistics LLC (NVO & OFF), 7977 NW 21st Street, Miami, FL 33122. Officers..., President/ Treasurer. Application Type: New NVO & OFF License. Icon Logistics Services LLC (NVO), 14440... Individual). Gbenga Vinusa, President. Application Type: New NVO License. Javelin Logistics Corporation (NVO...

  15. 78 FR 64493 - Juneau Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft...

    Science.gov (United States)

    2013-10-29

    ... Energy Regulatory Commission Juneau Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA..., 2013. d. Applicant: Juneau Hydropower, Inc. e. Name of Project: Sweetheart Lake Hydroelectric Project.... Applicant Contact: Duff Mitchell, Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK...

  16. 77 FR 60434 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-10-03

    ... Type: New OFF License. Farkas Worldwide Shipping Inc. (NVO), 1420 W. Flager Street, Miami, FL 33135, Officers: Heather R. Farkas, President (QI), Maria A. Farkas, Secretary, Application Type: New NVO License... License. Mota Import Export LLC dba MTI Mota Import Export Cargo Express (NVO), 175 Smith Street,...

  17. 76 FR 38651 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-07-01

    ..., (Qualifying Individual), Uri D. Silver, President, Application Type: QI Change. ICT International Cargo... applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel...). Notice is also hereby given of the filing of applications to amend an existing OTI license or...

  18. 18 CFR 2.7 - Recreational development at licensed projects.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Recreational development at licensed projects. 2.7 Section 2.7 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND INTERPRETATIONS Statements...

  19. 75 FR 80499 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-12-22

    ... Street, Orlando, FL 32812. Officers: Tanya Quiroz, Treasurer/ Secretary, (Qualifying Individual), Eddy A. Quiroz, President. Application Type: New NVO License. FPS Logistic (USA) Inc. dba Famous Pacific Lines...

  20. 76 FR 16420 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-03-23

    ... Global Logistics Consulting (OFF), 1010 19th Street, 10, Santa Monica, CA 90403. Officer: Andrea Bigi, Sole Proprietor (Qualifying Individual), Application Type: New OFF License. Annex Brands, Inc....

  1. 77 FR 26008 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-05-02

    ... License. CLN Worldwide, LLC (NVO & OFF), 1825-C Cross Beam Drive, Charlotte, NC 28217, Officer: David E..., Officers: Robin Lynch, Managing Member (Qualifying Individual), Gina Lynch, Member, Application...

  2. 78 FR 66713 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-06

    ..., Baldwin, NY 11510. Officer: Kamran Ali, President (QI), Application Type: New NVO & OFF License. Miragrown... 2D, Philadelphia, PA 19115. Officers: Mykola Chobotar, Chief Executive Manager (QI), James...

  3. 75 FR 29545 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-05-26

    .... Pacific Coast Highway, Suite 8406, Redondo Beach, CA 90277. Officers: Li Mei, Manager, (Qualifying.../ Treasurer, (Qualifying Individual). Application Type: New NVO License. Dated: May 21, 2010. Karen V....

  4. 75 FR 57267 - Haida Energy, Inc.; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-09-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Haida Energy, Inc.; Notice of Application for Amendment of License and.... Applicant: Haida Energy, Inc. e. Name of Project: Reynolds Creek Project. f. Location: On Reynolds...

  5. 78 FR 48870 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-12

    ..., Vice President, Application Type: New OFF License. Supply Chain Shipping LLC (OFF), 4607 44th Street SE..., FL 33126, Officer: Jorge L. Roa, President (QI), Application Type: NVO & OFF License. Kesco Logistics..., Application Type: Add Trade Name Daimon Logistics USA. Logistics International Parcel Shipping Transport...

  6. 78 FR 21365 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-04-10

    ... Container Line (NVO & OFF), 510 Plaza Drive, Suite 1210, Atlanta, GA 30349, Officers: John J. Laird... Officer (QI), Rosemary Myers, CEO, Application Type: New NVO & OFF License. Full Hull Logistics, LLC (NVO...), Deborah Jozwiak, Vice President, Application Type: New NVO & OFF License. Global Logistic Solution...

  7. 15 CFR 748.9 - Support documents for license applications.

    Science.gov (United States)

    2010-01-01

    ... Australia Austria Belgium Bulgaria China (PRC) Czech Republic Denmark Finland France Germany Greece Hong... application or license issued by BIS. The license application covering the transaction discloses all facts... Purchaser regarding reexport from the country of destination or any other facts relative to the transaction...

  8. 10 CFR 40.31 - Application for specific licenses.

    Science.gov (United States)

    2010-01-01

    ... Application for specific licenses. (a) A person may file an application for specific license on NRC Form 313... equipment. (vi) Assessment of releases. A brief description of the methods and equipment to assess releases... description of the means of restoring the facility to a safe condition after an accident. (xii)...

  9. 76 FR 554 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-01-05

    ... Individual), Oscar Espinosa, President. Application Type: New NVO & OFF License. Frontline Cargo Logistics.... 84th Avenue, Doral, FL 33166. Officers: Manuel J. Rojas, Vice President/Secretary/Treasurer (Qualifying Individual), Annette M. Diaz-Rojas, President. Application Type: License Transfer. Quartz Logistics Inc....

  10. 76 FR 10593 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-02-25

    ..., Application Type: QI Change. GC Logistics, Inc. (NVO), 79301 Country Club Drive, 104, Bermuda Dunes, CA 92203..., Application Type: New NVO License. KCTC International (America), Inc. dba World Bridge Line dba Green Shipping...: New NVO License. Pegasus3 Worldwide Logistics, LLC (NVO & OFF), 59 Grove Street, Stoughton, MA...

  11. 75 FR 39529 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-07-09

    ... & NVO License Blue Ocean Freight, Inc. dba Seaship Line (OFF & NVO), 250 Valley Street, 2F, Providence..., Secretary, Application Type: Add NVO Service and Trade Name Change Blue Ocean Shipping, Inc. dba Advanced... Ocean Transportation Intermediary License Applicants Notice is hereby given that the...

  12. 78 FR 48435 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-08

    ... 151 Avenue, Pembroke Pines, FL 33027, Officers: Michael L. DeBartolo, Managing Member (QI), Juan D. Restrepo, Member, Application Type: New NVO License. KYS Imports & Exports Inc. (NVO), 1938 Tyler Avenue..., Managing Member (QI), Oscar J. Alzate, Member, Application Type: New OFF License. MGL International...

  13. 75 FR 40837 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-07-14

    ...), Virgil Hale, President, Application Type: New OFF License. AFL International Logistics Group LLC (NVO..., Director, Application Type: New OFF License. Direct Service Inc. dba Tiger Freight International... Name Change. Jupiter Airline Services, Inc. dba Mercury Logistics (NVO), 5456 McConnell Avenue,...

  14. 78 FR 59923 - Cave Run Energy, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2013-09-30

    ... Energy Regulatory Commission Cave Run Energy, LLC; Notice of Intent To File License Application, Filing.... Project No.: 14376-001. c. Date Filed: July 21, 2013. d. Submitted By: Cave Run Energy, LLC. e. Name of Project: Cave Run Hydroelectric Project. f. Location: On the Licking River, in Rowan and Bath...

  15. 77 FR 20622 - N.E.W. Hydro LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions...

    Science.gov (United States)

    2012-04-05

    ... Energy Regulatory Commission N.E.W. Hydro LLC; Notice of Application for Amendment of License and...: Amendment of License. b. Project No.: 2744-041 & 042. c. Date Filed: March 14, 2012. d. Applicant: N.E.W... 167, 116 N. State Street, Neshkoro, WI 54869-0167, (920) 293-4628, Ext. 14. i. FERC Contact: John...

  16. 76 FR 68225 - License Renewal Application for Purdue University

    Science.gov (United States)

    2011-11-03

    ... licensee) to operate the Purdue University Reactor (PUR-1) at a maximum steady-state thermal power of 1... operate PUR-1 up to a steady- state thermal power of 12.5 kW (thermal) for an additional 20 years from the... License No. R- 087 for the PUR-1. Because the license renewal application was filed at least thirty...

  17. 76 FR 3636 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-01-20

    ... Ocean Transportation Intermediary License Applicants Notice is hereby given that the following...-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean Transportation Intermediary (OTI... NVO & OFF License. Marine Cargo Line, L.C. dba, Active Freight & Logistics (NVO), One Blue Hill...

  18. 75 FR 61757 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-10-06

    .... Application Type: New NVO & OFF License. Junction Int'l Logistics, Inc. (NVO), 17870 Castleton Street, Suite...: New NVO & OFF License. Red Arrow Consulting, Inc. dba Red Arrow Logistics (OFF), 14925 SE Allen Road... Networks, Inc. (NVO), 7511 Zircon Drive SW., Lakewood, WA 98498. Officer: Eun (AKA Michelle) K. Han...

  19. Nuclear Safety Design Base for License Application

    Energy Technology Data Exchange (ETDEWEB)

    R.J. Garrett

    2005-09-29

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111(b) [DIRS 173273] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113(b) and (c) [DIRS 173273] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period.

  20. 77 FR 63301 - Juneau Hydropower, Inc.; Notice of Draft License Application and Preliminary Draft Environmental...

    Science.gov (United States)

    2012-10-16

    ... Energy Regulatory Commission Juneau Hydropower, Inc.; Notice of Draft License Application and Preliminary...: August 31, 2012. d. Applicant: Juneau Hydropower, Inc. e. Name of Project: Sweetheart Lake Hydroelectric... Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, email: duff.mitchell@juneauhydro.com . i...

  1. 77 FR 10491 - City of Aspen; Notice of Intent To File License Application, Filing of Pre-Application Document...

    Science.gov (United States)

    2012-02-22

    ... Energy Regulatory Commission City of Aspen; Notice of Intent To File License Application, Filing of Pre....: 13254-002. c. Date Filed: December 12, 2011. d. Submitted By: City of Aspen. e. Name of Project: Castle Creek Hydroelectric Project. f. Location: On Maroon and Castle Creeks near the City of Aspen, in...

  2. 76 FR 25690 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-05-05

    ... Eastern Express (NVO), 10717 Camino Ruiz, 119, San Diego, CA 92126, Officers: Alex O. De Guzman, President..., (Qualifying Individual), Juan A. Peralta, President, Application Type: New NVO License. Genex Logistics,...

  3. 78 FR 14792 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-07

    ..., Secaucus, NJ 07094. Officer: Cesar E. Quinones, Sole Proprietor (QI). Application Type: New NVO License Denizabel Shipping, Inc. (OFF), 19558 NW 50th Court, Miami, FL 33055. Officer: Isabel Ramirez, President...

  4. 77 FR 45610 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-08-01

    ....gov . Access Supply Chain Services LLC (NVO), 65 West 5th Avenue 415, San Mateo, CA 94402, Officer...), Thomas C. Sasser, Treasurer, Application Type: New NVO & OFF License. Green Shipping, Inc. (NVO &...

  5. 75 FR 42446 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-07-21

    ...-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean Transportation Intermediary (OTI...), Chuck Sun, Vice President/Secretary. Application Type: New NVO & OFF License. E-Freight Solutions Inc...

  6. 77 FR 35384 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-13

    ... aka John Chen, President, Application Type: License Transfer JP Express Shipping, Corp. (NVO), 1873... Warehousing, Inc. (NVO & OFF), 1855 Gateway Blvd., 250, Concord, CA 94520, Officers: Steven T. Rubin,...

  7. 75 FR 60124 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-09-29

    ... Global Group, Inc. dba Aerocosta Global Systems Inc. (NVO), 2463 208th Street, 205, Torrance, CA 90501... Proprietor (Qualifying Individual), Application Type: New NVO License Praxis SCM, LLC (NVO & OFF),...

  8. 75 FR 28250 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-05-20

    ...), 8201 NW 66th Street, 6, Miami, FL 33166. Officers: Luis A. Marquez, President, (Qualifying Individual). Maria A. Garcia, Secretary. Application Type: New OFF License. Miriam Family Cargo, Inc. (NVO), 18...

  9. 75 FR 28595 - City of Idaho Falls; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-05-21

    ... Energy Regulatory Commission City of Idaho Falls; Notice of Application for Amendment of License and..., 2010, March 31, 2010. d. Applicant: City of Idaho Falls. e. Name of Project: Idaho Falls Hydroelectric Project. f. Location: The proposed non-project use is in Idaho Falls, Idaho. g. Filed Pursuant to:...

  10. License Application Design Selection Report, REV 01. August 1999

    Energy Technology Data Exchange (ETDEWEB)

    Hastings, C.R.

    1999-08-30

    In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value

  11. Total System Performance Assessment-License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  12. Research and Implementation for License Plate Recognition Based on Improved Projection Algorithm

    Institute of Scientific and Technical Information of China (English)

    LI Xiu-juan; Yimamu’aishan.Abudoulikemu

    2013-01-01

    This paper analyzes and dissertates the discrete wavelet transform and improved projection algorithm in four kernel stages (image preprocessing, license plate localization, character segmentation, license plate recognition, i.e.) of license plate recognition system in detail. At last, it gives some conclusions and suggestions on future research.

  13. 77 FR 6552 - Mahoning Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-02-08

    ... Energy Regulatory Commission Mahoning Hydropower, LLC; Notice of Intent To File License Application.... b. Project No.: P-13954-001. c. Date Filed: December 7, 2011. d. Submitted By: Mahoning Hydropower.... Potential Applicant Contact: Anthony Marra, Mahoning Hydropower, LLC, 11365 Normandy Lane, Chagrin Falls, OH...

  14. Nuclear Regulatory Commission activities to prepare for reviewing license applications and issuing licenses

    Energy Technology Data Exchange (ETDEWEB)

    Uleck, R.B.; DeFino, C.V. [Nuclear Regulatory Commission, Washington, DC (United States)

    1991-12-31

    The Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA) assigned States the responsibility to provide for disposal of commercial low-level radioactive waste (LLRW) by 1993. The LLRWPAA also required the US Nuclear Regulatory Commission (NRC) to establish procedures and develop the technical review capability to process license applications for new LLRW disposal facilities. Under the LLRWPAA, NRC is required, to the extent practicable, to complete its review of an LLRW disposal facility license application within 15 months of its submittal by a State. This provision of the LLRWPAA helps ensure that NRC, in addition to protecting public health and safety and the environment, facilitates States` achievement of LLRWPAA milestones for new facility development. A timely NRC review is needed for States to accomplish their objective of having new disposal facilities in operation on the dates prescribed in the LLRWPAA. To help assure NRC and States` compliance with the provisions of the LLRWPAA, NRC has developed a licensing review strategy that includes: (1) the further development of regulatory guidance, (2) enhancement of licensing review capability, and (3) prelicensing regulatory consultation with potential applicants.

  15. The contractor`s role in low-level waste disposal facility application review and licensing

    Energy Technology Data Exchange (ETDEWEB)

    Serie, P.J.; Dressen, A.L. [Environmental Issues Management, Inc., Seattle, WA (United States)

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department in a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.

  16. 76 FR 40903 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2011-07-12

    ... Energy Regulatory Commission Grand River Dam Authority; Notice of Application for Amendment of License...: Grand River Dam Authority. e. Name of Project: Salina Pumped Storage Project. f. Location: The project... River Dam Authority, P.O. Box 409, Vinita, OK 73401-0409. Tel: (918) 256-5545. i. FERC Contact:...

  17. 76 FR 7831 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2011-02-11

    ... Energy Regulatory Commission Grand River Dam Authority; Notice of Application for Amendment of License...: Grand River Dam Authority. e. Name of Project: Markham Ferry Project. f. Location: The project is..., Grand River Dam Authority, P.O. Box 409, Vinita, OK 73401-0409. Tel: (918) 256-5545. i. FERC...

  18. 75 FR 4363 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-01-27

    ... Energy Regulatory Commission Grand River Dam Authority; Notice of Application for Amendment of License..., 2009. d. Applicant: Grand River Dam Authority. e. Name of Project: Markham Ferry Hydroelectric Project... Contact: D. Casey Davis, Grand River Dam Authority, P.O. Box 409, 226 West Dwain Willis Avenue,...

  19. 76 FR 9015 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-02-16

    .../Treasurer (Qualifying Individual). Application Type: New NVO & OFF. Mega Supply Chain Solutions, Inc. (NVO.... Daley, President. Application Type: New OFF License. American Global Logistics, LLC (NVO & OFF), 53.... dba Citic Global Logistics dba Chimerica Global Logistics (NVO), 817 W. Beverly Blvd., 204,...

  20. 75 FR 70673 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-18

    ..., Officer: Andrew P. Scott, President/CEO (Qualifying Individual), Application Type: New NVO & OFF License... Panamerican Shipping Inc. (NVO & OFF), 710 Franklin Avenue, Brooklyn, NY 11238, Officers: Lamar Bailey, President (Qualifying Individual), Cristine Bailey, Corporate Secretary/Vice President Application Type: Add...

  1. 76 FR 74060 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-30

    ..., Application Type: New NVO License. ASF Advantage, L.L.C. (NVO & OFF), 330 Marshall Street, 400, Shreveport, LA..., Application Type: QI Change. Encargo Export Corporation dba Encargo Logistics, dba Encargo Lines (NVO & OFF..., Inc. dba Yacht Exports (NVO), 5337 Orange Drive, Davie, FL 33314; Officer: Alon Ezra,...

  2. 77 FR 49445 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-08-16

    ..., Officer: Jason P. Kwon, Member (Qualifying Individual), Application Type: New NVO License. Global Supply Chain Solutions Inc. (NVO & OFF), 2301 W. 205th Street, Unit 113, Torrance, CA 90501, Officers: Tony... Secretary (Qualifying Individual), Kurt Keuhn, Treasurer, Application Type: QI Change. UPS Supply...

  3. Residency Applicants Misinterpret Their United States Medical Licensing Exam Scores

    Science.gov (United States)

    Jones, Roger C.; Desbiens, Norman A.

    2009-01-01

    Proper interpretation of the results of the United States Medical Licensing Exam (USMLE) is important for program directors, residents, and faculty who advise applicants about applying for residency positions. We suspected that applicants often misinterpreted their performance in relationship to others who took the same examination. In 2005, 54…

  4. 77 FR 30530 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-05-23

    .... Piper, Member/President/CEO (Qualifying Individual), Application Type: New NVO License. Global Wine... NVO Service/Trade Name Change. M & D Global Logistics, Inc. (NVO & OFF), 2211 S. Hacienda Blvd., Suite...), Jun (Alex) Zhong, Secretary, Application Type: Add OFF Service. Metro Freight Services, Inc....

  5. 76 FR 31962 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-06-02

    ..., Application Type: New NVO & OFF. International First Service USA, Inc. dba Global Wine Logistics, Inc. (NVO..., (Qualifying Individual), Mohammad A. Madi, President, Application Type: Add NVO Service. Nano Express Corp... Type: New OFF License. Zai Cargo, Inc. dba Zai Ocean Services dba Zai Container Line (NVO & OFF),...

  6. 78 FR 5441 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-01-25

    ...-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF) pursuant to section 19 of the Shipping... Richard, President, Application Type: New OFF License. Amerifreight (N.A.), Inc. dba Freight Team (NVO..., Treasurer, Application Type: Add Trade Name Hyundai Glovis New Jersey, LLC. ] Harris International Freight...

  7. 78 FR 37540 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-06-21

    ..., Application Type: New NVO & OFF License. Allyn International Services, Inc. (OFF), 13391 McGregor Blvd., Fort..., Vice President (QI), James A. Williams, CEO, Application Type: QI Change. Thomas Griffin International, Inc. dba Sea Lion Ocean Freight (NVO), 15903 Kent Ct., Tampa, FL 33647, Officer: Thomas L....

  8. 77 FR 58181 - Power Resources, Inc., Smith Ranch Highland Uranium Project; License Renewal Request, Opportunity...

    Science.gov (United States)

    2012-09-19

    ... COMMISSION Power Resources, Inc., Smith Ranch Highland Uranium Project; License Renewal Request, Opportunity...-415- 4737, or by email to pdr.resource@nrc.gov . The ADAMS accession number for each document... is referenced. The Smith Ranch Highland Uranium Project license renewal request is...

  9. 18 CFR 16.22 - Application for an exemption by a licensee with a minor or minor part license for a project not...

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Application for an... of the Federal Power Act. 16.22 Section 16.22 Conservation of Power and Water Resources FEDERAL... exemption by an existing licensee, the Commission will decide among competing applications in...

  10. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z., E-mail: jonatasfmata@yahoo.com.br, E-mail: vasconv@cdtn.br, E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  11. 75 FR 74700 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-12-01

    ... Energy Regulatory Commission Grand River Dam Authority; Notice of Application for Amendment of License.... Date Filed: October 26, 2010. d. Applicant: Grand River Dam Authority. e. Name of Project: Markham.... 791(a)-825(r). h. Applicant Contact: Tamara E. Jahnke, Grand River Dam Authority, P.O. Box 409,...

  12. 75 FR 6018 - Boyce Hydro Power, LLC; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-02-05

    ... Energy Regulatory Commission Boyce Hydro Power, LLC; Notice of Application for Amendment of License and..., and supplemented on November 4, 2009. d. Applicant: Boyce Hydro Power, LLC (BHP). e. Name of Project.... Applicant Contact: Frank Christie, General Manager, Boyce Hydro Power, LLC, 6000 South M-30, P.O. Box...

  13. 76 FR 55909 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-09-09

    ... Global Logistics (Georgia) Inc. dba CTS Global Supply Chain Solutions (NVO & OFF), 5192 Southridge... Application Type: New OFF & NVO License. AA Equipment and Sales, LLC dba AIM Global Logistics (NVO & OFF... Change. BestOcean Worldwide Logistics, Inc. (NVO & OFF), 1300 Valley Vista Drive, Suite 203, Diamond...

  14. 77 FR 59193 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-09-26

    .... CTS Global Logistics (Georgia) Inc. dba CTS Global Supply Chain Solutions (NVO & OFF), 5192 Southridge.... Rivera, President (QI), Howard Helfer, Vice President, Application Type: New OFF License. Bring Logistics... Logistics, LLC (NVO & OFF), 4911 N. Portland Avenue, Suite 200, Oklahoma City, OK 73112, Officers: Thomas...

  15. 15 CFR 750.4 - Procedures for processing license applications.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Procedures for processing license applications. 750.4 Section 750.4 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade.... Consultation with other governments, if such consultation is provided for by a relevant bilateral arrangement...

  16. 77 FR 65887 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-10-31

    ...; Koch Maritime, Inc (NVO & OFF), 2230 Energy Park Drive, St. Paul, MN 55108, Officers: Yvonne M. Ecklund..., Application Type: New NVO & OFF License; TC Shipping LLC (OFF), 206 Central Place, Orange, NJ 07050, Officers...; Worldwide Freight LLC (OFF), 800 Grotto Street North, Saint Paul, MN 55106, Officers: Kimberly A. Coppola...

  17. 75 FR 25257 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-05-07

    ...-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean Transportation Intermediary (OTI... Intermediaries, Federal Maritime Commission, Washington, DC 20573. Atlantic Integrated Freight Inc. (NVO), 19... Individual), Application Type: New NVO License. Direct Service Inc. dba Tiger Freight International...

  18. 77 FR 32010 - Applications (Classification, Advisory, and License) and Documentation

    Science.gov (United States)

    2012-05-31

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF COMMERCE Bureau of Industry and Security 15 CFR Part 748 Applications (Classification, Advisory, and License) and Documentation CFR Correction 0 In Title 15 of the Code of Federal Regulations, Parts 300 to 799, revised as...

  19. 75 FR 46938 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-04

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION..., Manager, Application Type: New NVO & OFF License. Duke System Logistics Inc. (NVO & OFF), 18645 E. Gale.... Gina Marie Cianelli dba Global Bookings (OFF), 261 Jerry Allen Ridge, Dallas, GA 30132, Officer: Gina...

  20. 76 FR 72409 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-23

    ...), Application Type: New OFF License. MBM International Logistics, LLC (NVO & OFF), 650 Atlanta South Parkway... OTI@fmc.gov . AE Eagle Logistics Inc. (NVO & OFF), 765 Route 83, Suite 111, Bensenville, IL 60106... Type: Add OFF Service. Asecomer International Corporation dba Interworld Freight, Inc. dba Junior...

  1. Licensed reactor nuclear safety criteria applicable to DOE reactors

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards.

  2. Total System Performance Assessment - License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  3. 47 CFR 80.55 - Application for a fleet station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a fleet station license. 80.55... SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.55 Application for a fleet... different vessels on the same application. Under these circumstances a fleet station license may be...

  4. 21 CFR 515.20 - Approval of medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Approval of medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.20 Approval of medicated feed mill license applications. Within 90 days after...

  5. 21 CFR 515.21 - Refusal to approve a medicated feed mill license application.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Refusal to approve a medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.21 Refusal to approve a medicated feed mill license application. (a)...

  6. 77 FR 30518 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-05-23

    ... Energy Regulatory Commission Grand River Dam Authority; Notice of Application for Amendment of License... 11, 2012. d. Applicant: Grand River Dam Authority. e. Name of Project: Pensacola Hydroelectric... Counsel, Grand River Dam Authority, P.O. Box 409, Vinita, Oklahoma 74301, (918) 256-5545. i. FERC...

  7. 77 FR 1924 - Middlebury Electric, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-01-12

    ..., in Addison County, Vermont. No federal lands would be occupied by the project works or located within... Hydropower Licensing approved Middlebury Electric, LLC's requests to use the Traditional Licensing Process. k...

  8. 21 CFR 515.11 - Supplemental medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Supplemental medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.11 Supplemental medicated feed mill license applications. (a) After approval of a medicated...

  9. 21 CFR 515.25 - Revocation of order refusing to approve a medicated feed mill license application or suspending...

    Science.gov (United States)

    2010-04-01

    ... medicated feed mill license application or suspending or revoking a license. 515.25 Section 515.25 Food and..., FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.25 Revocation of order refusing to approve a medicated feed mill license application or suspending or revoking...

  10. Licensed reactor nuclear safety criteria applicable to DOE reactors

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC (Nuclear Regulatory Commission) licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor.

  11. Nursing: Licensed Practical and Licensed Vocational Nurses

    Science.gov (United States)

    ... Projected Employment, 2024 Change, 2014-24 Employment by Industry Percent Numeric SOURCE: U.S. Bureau of Labor Statistics, Employment Projections program Licensed practical and licensed vocational ...

  12. Capital Projects Application (CPA)

    Data.gov (United States)

    General Services Administration — Capital Projects application (CPA) provides users with the ability to maintain project related financial data for Budget Activity (BA) 51, 55, 64, 01, 02, 03, 04....

  13. 47 CFR 13.13 - Application for a renewed or modified license.

    Science.gov (United States)

    2010-10-01

    .... 13.13 Section 13.13 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO... a period of 1 year. (d) Provided that a person's commercial radio operator license was not revoked... License, or GMDSS Radio Operator/Maintainer license, who has an application for another commercial...

  14. 18 CFR 16.10 - Information to be provided by an applicant for new license: Filing requirements.

    Science.gov (United States)

    2010-04-01

    ... generation lost at the project over the last five years because of unscheduled outages, including the cause... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Information to be provided by an applicant for new license: Filing requirements. 16.10 Section 16.10 Conservation of...

  15. 78 FR 4467 - UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3...

    Science.gov (United States)

    2013-01-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3, Exemption 1.0 Background UniStar Nuclear Energy (UNE), on behalf of Calvert Cliffs Nuclear Project, LLC and...

  16. 75 FR 53686 - Gresham Municipal Utilities; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2010-09-01

    ..., Wisconsin. No federal lands are occupied by the project works or located within the project boundary. g... Division of Hydropower Licensing, approved Gresham Municipal Utilities request to use the Traditional...

  17. 76 FR 20971 - Free Flow Power Corporation; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2011-04-14

    ... occupied by the project works or located within the project boundary. g. Filed Pursuant to: Federal Power..., Division of Hydropower Licensing, approved the request to use the Traditional Licensing Process. k. With...

  18. 76 FR 70719 - Public Utility District No. 1 of Snohomish County; Notice of Intent To File License Application...

    Science.gov (United States)

    2011-11-15

    ... by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the... the Division of Hydropower Licensing approved Snohomish PUD's request to use the Traditional Licensing...

  19. 78 FR 36014 - Deepwater Port License Application: Liberty Natural Gas, LLC, Port Ambrose Deepwater Port

    Science.gov (United States)

    2013-06-14

    ... an application for the licensing of a liquefied natural gas deepwater port and that the application..., and operate a liquefied natural gas (LNG) deepwater port, known as Port Ambrose, located in the New... Maritime Administration Deepwater Port License Application: Liberty Natural Gas, LLC, Port...

  20. 47 CFR 0.483 - Applications for amateur or commercial radio operator licenses.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Applications for amateur or commercial radio..., and for Taking Examinations § 0.483 Applications for amateur or commercial radio operator licenses. (a...) Application filing procedures for commercial radio operator licenses are set forth in part 13 of this...

  1. 76 FR 72984 - Revised Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2011-11-28

    ... COMMISSION Revised Application for a License To Export High-Enriched Uranium The application for a license to export high-enriched Uranium has been revised as noted below. Notice of this application was previously... kilograms To fabricate fuel France. Security Complex; October 18, Uranium (93.35%). uranium (174.0...

  2. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  3. 76 FR 63344 - Pilot Project on NAFTA Trucking Provisions; Commercial Driver's License Memorandum of...

    Science.gov (United States)

    2011-10-12

    ... [Federal Register Volume 76, Number 197 (Wednesday, October 12, 2011)] [Notices] [Pages 63344-63346] [FR Doc No: 2011-26442] DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration [Docket No FMCSA-2011-0097] Pilot Project on NAFTA Trucking Provisions; Commercial Driver's License...

  4. 78 FR 38736 - License Amendment Request for Homestake Mining Company of California, Grants Reclamation Project...

    Science.gov (United States)

    2013-06-27

    ... NRC E-Filing rule (72 FR 49139; August 28, 2007). The E-Filing process requires participants to submit..., Cibola County, New Mexico AGENCY: Nuclear Regulatory Commission. ACTION: License amendment request... Reclamation Project located in Cibola, County, New Mexico. Upon NRC review and approval, the updated DRP...

  5. 76 FR 65544 - Standard Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities

    Science.gov (United States)

    2011-10-21

    ... issuance of the guide (74 FR 36780). The comment period closed on September 21, 2009. The staff's responses... COMMISSION Standard Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities... Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities.'' This...

  6. 78 FR 70589 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-11-26

    ... Oconee assumes 5 gpm back-leakage from the Reactor Building sump to the BWST. The automatic isolation... National Fire Protection Association (NFPA) 805, ``Performance- Based Standard for Fire Protection for... new fire protection licensing basis which complies with the requirements in 10 CFR 50.48(a), 10 CFR...

  7. 77 FR 22808 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-04-17

    ... different type of equipment will be installed) or changes in methods governing normal plant operation. The... governing normal plant operation. In addition, the changes do not impose any new or different requirements...-related system performs its function. The change revises license renewal commitments and aging...

  8. 76 FR 76705 - Inside Passage Electric Cooperative; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2011-12-08

    ..., Alaska, on Chichagof Island. No federal lands are occupied by the project works. g. Filed Pursuant to: 18... Division of Hydropower Licensing approved IPEC's request to use the Traditional Licensing Process. k. With...

  9. 75 FR 14437 - North Eastern Wisconsin Hydro Inc. (N.E.W. Hydro); Notice of Intent To File License Application...

    Science.gov (United States)

    2010-03-25

    ... Marinette County, Wisconsin. No Federal lands are occupied by the project works or located within the... Division of Hydropower Licensing approved N.E.W. Hydro's request to use the Traditional Licensing Process...

  10. 77 FR 16278 - License Renewal Application for Indian Point Nuclear Generating Units 2 and 3; Entergy Nuclear...

    Science.gov (United States)

    2012-03-20

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION License Renewal Application for Indian Point Nuclear Generating Units 2 and 3; Entergy Nuclear Operations, Inc. AGENCY: Nuclear Regulatory Commission. ACTION: License renewal application; intent...

  11. 76 FR 78702 - Progress Energy Florida, Inc. (Combined License Application for Levy County Nuclear Power Plant...

    Science.gov (United States)

    2011-12-19

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Progress Energy Florida, Inc. (Combined License Application for Levy County Nuclear Power Plant...) and 2.321(b), the Atomic Safety and Licensing Board (Board) in the above-captioned Progress Energy...

  12. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  13. Automated License Plate Recognition for Toll Booth Application

    Directory of Open Access Journals (Sweden)

    Ketan S. Shevale

    2014-10-01

    Full Text Available This paper describes the Smart Vehicle Screening System, which can be installed into a tollbooth for automated recognition of vehicle license plate information using a photograph of a vehicle. An automated system could then be implemented to control the payment of fees, parking areas, highways, bridges or tunnels, etc. There are considered an approach to identify vehicle through recognizing of it license plate using image fusion, neural networks and threshold techniques as well as some experimental results to recognize the license plate successfully.

  14. 77 FR 61584 - FFP Missouri 12, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-10-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 12, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of...

  15. 77 FR 13604 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-07

    ...), One Cross Island Plaza, Suite 302, Rosedale, NY 11422, Officers: Chang W. Kim, Vice President...: New NVO License. MNS International Inc (NVO & OFF), 589 Franklin Turnpike, Ridgewood, NJ 07450...

  16. 7 CFR 1530.104 - Application for a license.

    Science.gov (United States)

    2010-01-01

    ... any wholly-owned subsidiary(s) and plant(s) in the case of a consolidated license, and including those... affiliated with any other licensee, or explaining any affiliations, should they exist. (b) A...

  17. 75 FR 22408 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-04-28

    ... License. Damco USA Inc. dba Damco Sea and Air dba Damco dba Damco Maritime dba DSL Star Express dba Maersk... Logistics LLC dba JSK Lines (OFF & NVO), 4 Wernik Place, Metuchen, NJ 08840. Officers: Norbert G....

  18. 78 FR 38336 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-06-26

    ... Express, LLC (NVO & OFF), 812 Downtowner Blvd., Suite K, Mobile, AL 36609, Officers: Thomas (Mac) H. Mc... License. Magnum-Ramstr Cargo LLC (NVO & OFF), 2 Ethel Road, Suite 202C, Edison, NJ 08817,...

  19. 78 FR 33841 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-06-05

    ... Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF) pursuant to section 19 of the Shipping Act of 1984 (46 U.S.C. 40101). Notice is also given...

  20. 75 FR 69080 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-10

    ...-Operating Common Carrier (NVO), and/or Ocean Freight Forwarder (OFF)--Ocean Transportation Intermediary (OTI... License. Freight Forwarder International, Inc. (OFF), 200 Crofton Road, Building 14-A, Kenner, LA 70062...

  1. 77 FR 16023 - 5440 Hydro, Inc.: Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-03-19

    ... Groveton in Coos County, New Hampshire. No federal lands are occupied by the project works or located..., 2012. In a letter dated March 13, 2012, the Acting Director of the Division of Hydropower Licensing...

  2. 78 FR 73566 - Standard Format and Content for a License Application for an Independent Spent Fuel Storage...

    Science.gov (United States)

    2013-12-06

    ... COMMISSION Standard Format and Content for a License Application for an Independent Spent Fuel Storage... public comment draft regulatory guide (DG), DG-3042, ``Standard Format and Content for a License... Waste'' (Ref. 1), Subpart B, ``License Application, Form, and Contents,'' specifies the information...

  3. 78 FR 36641 - Proposed Information Collection (Application for Approval of a Licensing or Certification and...

    Science.gov (United States)

    2013-06-18

    ... AFFAIRS Proposed Information Collection (Application for Approval of a Licensing or Certification and Organization or Entity) Activity: Comment Request AGENCY: Veterans Benefits Administration, Department of Veterans Affairs. ACTION: Notice. SUMMARY: The Veterans Benefits Administration (VBA), Department...

  4. 76 FR 67557 - Proposed Information Collection (Application for Reimbursement of Licensing or Certification Test...

    Science.gov (United States)

    2011-11-01

    ... AFFAIRS Proposed Information Collection (Application for Reimbursement of Licensing or Certification Test Fees) Activity: Comment Request AGENCY: Veterans Benefits Administration, Department of Veterans Affairs. ACTION: Notice. SUMMARY: The Veterans Benefits Administration (VBA), Department of...

  5. 75 FR 47680 - Proposed Information Collection (Application for Approval of a Licensing or Certification and...

    Science.gov (United States)

    2010-08-06

    ... AFFAIRS Proposed Information Collection (Application for Approval of a Licensing or Certification and Organization or Entity) Activity: Comment Request AGENCY: Veterans Benefits Administration, Department of Veterans Affairs. ACTION: Notice. SUMMARY: The Veterans Benefits Administration (VBA), Department...

  6. 78 FR 40519 - Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving...

    Science.gov (United States)

    2013-07-05

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving Proposed... No. DPR-46, issued to Nebraska Public Power District (the licensee), for operation of the...

  7. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    O' Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act.

  8. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  9. 76 FR 39922 - Notice of Acceptance of Application for Special Nuclear Materials License From Sensor Concepts...

    Science.gov (United States)

    2011-07-07

    ... COMMISSION Notice of Acceptance of Application for Special Nuclear Materials License From Sensor Concepts and... Sensor Concepts and Applications, Inc's., (SCA) application is available electronically under ADAMS... Detection Office (DNDO) of the U.S. Department of Homeland Security (DHS). Sensor Concepts and Applications...

  10. 78 FR 78956 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-12-27

    ... Gabbro Global, LLC (NVO), 18353 US Highway 20, East Dubuque, IL 61025, Officers: Zheng Bin Ng, Director... License Reza Rostami dba Pan World Trans (NVO & OFF), 5406 Juniper Court, Colleyville, TX 76034, Officer... Management, Inc. dba Pan World Trans Savitransport Inc. (NVO), 148-08 Guy R. Brewer Blvd., Jamaica, NY...

  11. 21 CFR 515.10 - Medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... Veterinary Medicine home page at http://www.fda.gov/cvm. (b) A completed medicated feed mill license must... certification that the facility will establish and maintain all records required by regulation or order issued... verification of such records. (7) A commitment that current approved or index listed Type B and/or Type...

  12. 78 FR 8534 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-02-06

    ...-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF) pursuant to section 19 of the Shipping... telephone at (202) 523-5843 or by email at OTI@fmc.gov . Atlanta Customs Brokers & Intl Freight Forwarders... & OFF License AZ Freight Inc. (NVO & OFF), 6610 149th Street, Suite 6H, Flushing, NY 11367, Officers...

  13. 77 FR 18815 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-28

    ... License. Esko, Inc. (NVO), 19008 Herb Court, Rowland Heights, CA 91748. Officers: Lin L. Chen, Vice..., Torrance, CA 90505. Officers: Emily Chen, President (Qualifying Individual). Chun-Yi Lin, Member..., Mobile, AL 36602. Officers: Steven A. Haverstock, President (Qualifying Individual). Kevin L....

  14. Application of IC Card License for Road Transportation in Commercial Vehicles Supervision and Service

    Directory of Open Access Journals (Sweden)

    Li Weiwei

    2016-01-01

    Full Text Available IC card electronic license for road transport includes the IC card commercial vehicle’s certificate and IC card practitioner’s qualification certificate. In China, the IC card electronic license for road transport is the electronic ID card which must be carried by each commercial vehicles and practitioners. This paper briefly introduces the basic situation, data format and security keys architecture of IC card electronic license for road transportation of China. In order to strengthen the supervision and service of commercial vehicles, this paper puts forward the overall application framework of IC card electronic license for road transport. The application examples of IC card license in the supervision of passenger station, dangerous goods transport management, governance overload and logistics park and port area management are discussed. The practical application results show that the application of IC card electronic license for road transport is an important technical means to improve the supervision ability and service quality of the road transportation industry.

  15. 76 FR 7847 - Glenn A. Baxter, Application To Renew License for Amateur Radio Service Station K1MAN

    Science.gov (United States)

    2011-02-11

    ... COMMISSION Glenn A. Baxter, Application To Renew License for Amateur Radio Service Station K1MAN AGENCY... renew the license for Amateur Radio Service Station K1MAN filed by Glenn A. Baxter should be granted.... Baxter for renewal of his license for Amateur Radio Station K1MAN should be granted. As discussed below...

  16. 78 FR 75386 - Entergy Operations, Inc.; Combined License Application for River Bend Station Unit 3, Exemption...

    Science.gov (United States)

    2013-12-11

    ... Register on November 3, 2011 (76 FR 72560). Part 50, Appendix E, Section I.5 gives those COL applicants... Preparedness (EP) rules in their Combined License (COL) application. The NRC staff reviewed this request and... submitted prior to, or coincident with, requesting the NRC to resume its review of the COL application,...

  17. 75 FR 57820 - Luminant Generation Company, LLC.; Combined License Application for Comanche Peak Nuclear Power...

    Science.gov (United States)

    2010-09-22

    ..., Combined License (COL) Application, Docket Numbers 52-034 and 52-035, submitted by Luminant Generation... of a COL application until the NRC makes a finding under 10 CFR 52.103(g) pertaining to facility... Analysis Report (FSAR). The proposed exemption would allow Luminant to submit its COL application...

  18. The dispute over the social license for mining projects in La Rioja, Argentina

    Directory of Open Access Journals (Sweden)

    Mariana Sola Álvarez

    2013-11-01

    Full Text Available Since the beginning of this century, projects of transnational corporations design to extract -in a mega scale- gold, silver, copper, and molybdenum are back to interrogate Famatina Valley, located in the northwest of Argentina, in the province of La Rioja. The dispute that is generated around the "social license" of mining projects highlights features of policy matrix and local government backing for extractive activities. At the same time illustrates the content and the potentiality of social resistance. The power of veto from a network of neighbors assemblies and a highly mobilized community in critical moments of the conflict is framed in a process of resistance to mercantilization of commons that travels through Latin America.

  19. License - Budding yeast cDNA sequencing project | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available n the Standard License. Standard License The Standard License for this database is the license specified in the Creative Commons...ght© 2009 Takashi Ito(the University of Tokyo) licensed under CC Attribution-Share Alike 2.1 Japan . The summary of the Creative Comm...ons Attribution-Share Alike 2.1 Japan is found here . Wi

  20. 77 FR 65720 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-10-30

    ..., see the application for amendment which is available for public inspection at the NRC's PDR, located... of safety is associated with confidence in the ability of the fission product barriers (i.e., fuel... hot channel factor, nuclear enthalpy rise hot channel factor, loss of coolant accident peak...

  1. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  2. 75 FR 467 - Notice of Opportunity for Hearing, License Application Request of Powertech (USA) Inc. Dewey...

    Science.gov (United States)

    2010-01-05

    ... uranium by in situ recovery (ISR) extraction. By letter dated June 19, 2009, Powertech (USA) withdrew the...-Burdock In Situ Uranium Recovery Facility in Fall River and Custer Counties, SD, and Order Imposing... CONTACT: Ronald A. Burrows, Project Manager, Uranium Recovery Licensing Branch, Division of...

  3. 78 FR 79506 - Tennessee Valley Authority: Exemption From Requirements To Revise Combined License Application To...

    Science.gov (United States)

    2013-12-30

    ... revise their COL application to comply with the EP rules published in the Federal Register (76 FR 72560... revise their combined license (COL) application in order to address enhancements to the Emergency Preparedness (EP) rules at the same time as requesting the NRC to resume the review of their COL...

  4. 76 FR 800 - Ameren Missouri, Combined License Application for Callaway Plant Unit 2; Environmental Assessment...

    Science.gov (United States)

    2011-01-06

    ...) for the Callaway Plant (Callaway), Unit 2, Combined License (COL) Application, Docket Number 52-037... located in Callaway ] County, Missouri. The NRC's review activities relating to the Callaway, Unit 2, COL... adjudicatory proceedings related to the Callaway, Unit 2, COL application were terminated by the Atomic...

  5. 75 FR 37471 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-06-29

    ... license amendment application, see the application for amendment which is available for public inspection..., which include the cooling water, starting air, lubrication, intake and exhaust, and fuel oil systems... boiling (DNBR) limits, heat flux hot channel factor (F Q (Z)) limits, nuclear enthalpy rise hot...

  6. E-Licensing in DGFT: A Best E-Governance Application

    Directory of Open Access Journals (Sweden)

    V. S. Rana

    2013-07-01

    Full Text Available This is a case of effective and efficient e-Governance where the licenses are issued electronically by using of IT for web based delivery service in the Directorate General of Foreign Trade (DGFT. Now a days complete licensing procedure is dealing through electronically i.e. Exporter/Importer apply electronically to get the Importer Exporter Code( IEC , submitting the fees as well as necessary documents electronically and received the IEC electronically. Trading Community is also availing the Online facility to submit the application for any licensing scheme, depositing the licensing fees, enclosing the required document from their end. The official procedure is also automated like initiating the note sheet, generating the ecom number, consolation of license fees and issuing the license to the exporter. There is fifty percent role of customs involved in trading. So that Electronic Data Interchange(EDI facility is also established with Customs. In addition to above services, Bank Realization Certificate(BRC is also integrated with this system. Henceforth an Exporter/Importer is equipped with electronic services without visiting to the office of DGFT, Customs and Bank. The web has been strategically leveraged for reengineering and transformation of trade processes for an economic trade facilitation.

  7. SAMA analysis in support of license renewal application for the Fort Calhoun Station

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, R.E.; Jacob, M.C. [Westinghouse Electric Company, Monroeville PA (United States); Hackerott, H.A. [Omaha Public Power District, Omaha NE (United States)

    2004-07-01

    The Omaha Public Power District (OPPD) owns and operates the Fort Calhoun Station Unit 1 (FCS), a single unit Pressurized Water Reactor (PWR) plant. This plant was licensed by the U.S. Nuclear Regulatory Commission (NRC) to operate at a core power level of 1500 MWt for a period of 40 years. In 2002 OPPD submitted a license renewal application to the NRC and recently, this application for a license renewal for a period of 20 more years was approved by the NRC. In order to secure the license renewal, the utility evaluated Severe Accident Mitigation Alternatives (SAMAs) and identified potential risk significant and cost-beneficial plant changes. This process consisted of a review of past industry changes obtained via past SAMA analyses and advanced reactor design efforts as well as a review of FCS PSA (Probabilistic Safety Assessment) insights. While most of the industry-based SAMAs were screened out, the internally focused changes were mostly found to be risk significant and cost effective. This paper presents the SAMA analysis performed in support of the FCS license renewal application and discusses the insights from this analysis. (authors)

  8. 19 CFR 111.14 - Investigation of the license applicant.

    Science.gov (United States)

    2010-04-01

    ... the statements made in the application; (2) The business integrity of the applicant; and (3) When the... corporation), the character and reputation of the applicant. (c) Referral to Headquarters. The port director...

  9. 77 FR 1924 - FFP Missouri 15, LLC; FFP Missouri 16, LLC; Notice of Intent To File License Application, Filing...

    Science.gov (United States)

    2012-01-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 15, LLC; FFP Missouri 16, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process...

  10. 77 FR 63812 - FFP Missouri 5, LLC; FFP Missouri 6, LLC; Notice of Intent To File License Application, Filing of...

    Science.gov (United States)

    2012-10-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 5, LLC; FFP Missouri 6, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process...

  11. 78 FR 14528 - Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and...

    Science.gov (United States)

    2013-03-06

    ... Energy Regulatory Commission Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On November 20, 2012, Mayo Hydropower, LLC (transferor) and Avalon Hydropower, LLC (transferee) filed an application for transfer of license...

  12. 76 FR 77021 - Notice of Availability of Combined License Applications

    Science.gov (United States)

    2011-12-09

    .... Nuclear Regulatory Commission (NRC) is giving notice once each week for four consecutive weeks of combined... Nuclear Regulatory Commission. Jeffrey Cruz, Chief, AP1000 Projects Branch 1, Division of New Reactor...

  13. 76 FR 72725 - Notice of Availability of Combined License Applications

    Science.gov (United States)

    2011-11-25

    .... Nuclear Regulatory Commission (NRC) is giving notice once each week for four consecutive weeks of combined... Nuclear Regulatory Commission. Jeffrey Cruz, Chief, AP1000 Projects Branch 1, Division of New Reactor...

  14. 76 FR 71608 - Notice of Availability of Combined License Applications

    Science.gov (United States)

    2011-11-18

    .... Nuclear Regulatory Commission (NRC) is giving notice once each week for four consecutive weeks of combined... 14th day of November 2011. Jeffrey Cruz, Chief, AP1000 Projects Branch 1, Division of New Reactor...

  15. 76 FR 75566 - Notice of Availability of Combined License Applications

    Science.gov (United States)

    2011-12-02

    .... Nuclear Regulatory Commission (NRC) is giving notice once each week for four consecutive weeks of combined... 28th day of November, 2011. Jeffrey Cruz, Chief, AP1000 Projects Branch 1, Division of New Reactor...

  16. 75 FR 51451 - Erie Boulevard Hydropower, L.P.; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2010-08-20

    ... Energy Regulatory Commission Erie Boulevard Hydropower, L.P.; Notice of Intent To File License..., 2010. d. Submitted By: Erie Boulevard Hydropower, L.P. e. Name of Project: Chasm Hydroelectric Project... project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission's...

  17. 75 FR 63476 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2010-10-15

    .... Application Type: QI Change. David A. Knott dba DAK Logistics Services (NVO), 1010 Bluejay Drive, Suisun City, CA 94585. Officer: David A. Knott, Owner (Qualifying Individual), Application Type: New NVO...

  18. 75 FR 34139 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-06-16

    ..., President (Qualifying Individual), Keith Milliner, Vice President, Application Type: Add NVO Service. Aztec...., Albuquerque, NM 87107, Officers: Terry L. Strohl, Operations Manager (Qualifying Individual), William W. Moore... Rosendorf, President (Qualifying Individual), Keith Milliner, Vice President, Application Type: Add...

  19. 76 FR 28219 - Georgia Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2011-05-16

    .... Applicant: Georgia Power Company. e. Name of Project: Wallace Pumped Storage Project. f. Location: Lake... Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric...

  20. 77 FR 73054 - Application for a License To Export Radioactive Waste

    Science.gov (United States)

    2012-12-07

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Application for a License To Export Radioactive Waste Pursuant to 10 CFR 110.70(b) ``Public Notice.... 2012, October 25, 2012, XW020, radioactive 1178 pounds disposal by the 11006061. waste in the...

  1. 78 FR 45578 - Application For a License to Export Radioactive Waste

    Science.gov (United States)

    2013-07-29

    ... COMMISSION Application For a License to Export Radioactive Waste Pursuant to 10 CFR 110.70 (b) ``Public... quantity Storage or Canada. June 4, 2013, June 5, 2013, radioactive waste authorized for disposal by the XW021, 11006101. as contaminated export will not original secondary waste exceed quantities generators...

  2. 77 FR 39521 - Application for a License To Export Nuclear Reactor Major Components and Equipment

    Science.gov (United States)

    2012-07-03

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Application for a License To Export Nuclear Reactor Major Components and Equipment Pursuant to 10... Reactor internals, Components and For use in Braka nuclear power Company LLC reactor coolant equipment...

  3. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Science.gov (United States)

    2013-06-20

    ... COMMISSION 10 CFR Parts 51 and 54 RIN 3150-AI42 Preparation of Environmental Reports for Nuclear Power Plant..., Supplement 1 (RG 4.2S1), ``Preparation of Environmental Reports for Nuclear Power Plant License Renewal... reports that are submitted with the application for the renewal of a nuclear power plant operating...

  4. 76 FR 52994 - Application for a License To Export Heavy Water

    Science.gov (United States)

    2011-08-24

    ... COMMISSION Application for a License To Export Heavy Water Pursuant to 10 CFR 110.70 (b) ``Public Notice of... end-use for China. (D2O--heavy (liters). producing an active water). pharmaceutical ingredient known as CTP-499, which incorporates heavy water as the source of deuterium to achieve the...

  5. 78 FR 25486 - Luminant Generation Company, LLC., Combined License Application for Comanche Peak Nuclear Power...

    Science.gov (United States)

    2013-05-01

    ... COMMISSION Luminant Generation Company, LLC., Combined License Application for Comanche Peak Nuclear Power... Generation Company, LLC. (Luminant) for the proposed facility to be located in Somervell County, Texas. In... or who encounter problems in accessing the documents located in ADAMS should contact the NRC...

  6. 77 FR 75676 - Standard Review Plan for Review of Fuel Cycle Facility License Applications

    Science.gov (United States)

    2012-12-21

    ... Regulatory Commission. ACTION: NUREG revision; extension of comment period. SUMMARY: On December 7, 2012 (77... to NUREG- 1520, Revision 1, ``Standard Review Plan (SRP) for the Review of a License Application for... document is available in ADAMS) is provided the first time that a document is referenced....

  7. 21 CFR 601.51 - Confidentiality of data and information in applications for biologics licenses.

    Science.gov (United States)

    2010-04-01

    ...) Adverse reaction reports, product experience reports, consumer complaints, and other similar data and... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Confidentiality of data and information in applications for biologics licenses. 601.51 Section 601.51 Food and Drugs FOOD AND DRUG...

  8. 77 FR 14445 - Application for a License To Export Steel Forging

    Science.gov (United States)

    2012-03-09

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Application for a License To Export Steel Forging Pursuant to 10 CFR 110.70(b) ``Public Notice of... Spain. December 15, 2011 head steel head steel February 7, 2012 forging. forging will be XR175...

  9. 77 FR 1956 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-01-12

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(b) ``Public... Netherlands. Security Complex. Uranium uranium (9.3 targets at December 21, 2011 (93.35%). kilograms U-...

  10. 77 FR 51579 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-08-24

    ... COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70 (b) ``Public... kilograms For the export of Canada. Complex, July 30, 2012, August Uranium (93.35%). uranium-235 high-enriched 1, 2012, XSNM3726, 11006037. contained in 7.5 uranium in the kilograms uranium. form of...

  11. 78 FR 33448 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2013-06-04

    ... COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70 (b) ``Public... targets Canada. Security Complex, May 13, Uranium (93.35%). uranium-235 at the National 2013, May 21, 2013, XSNM3745, contained in 7.5 Research Universal 11006098. kilograms reactor in Canada for uranium....

  12. 77 FR 73056 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-12-07

    ... COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70 (b) ``Public... targets Belgium. Security Complex. Uranium (93.2%). uranium-235 at CERCA AREVA Romans October 10, 2012 contained in 6.2 in France and to October 12, 2012 kilograms irradiate targets at XSNM3729 uranium. the...

  13. 75 FR 6223 - Application For a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-02-08

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Application For a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public... fabricate Canada. Complex December 21, 2009, Uranium (93.35%). uranium (16.3 targets for December 28,...

  14. 75 FR 7525 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-02-19

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public... fuel France; Belgium. Security Complex, February 2, Uranium (93.35%). uranium (87.3 elements in...

  15. 76 FR 59173 - Standard Format and Content of License Applications for Conventional Uranium Mills

    Science.gov (United States)

    2011-09-23

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Standard Format and Content of License Applications for Conventional Uranium Mills AGENCY: Nuclear... Conventional Uranium Mills.'' DG- 3024 was a proposed Revision 2 of Regulatory Guide (RG) 3.5. However,...

  16. 75 FR 15743 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-03-30

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public... fabricate fuel France. Complex, March 3, 2010. Uranium (93.35%). uranium (149.36 elements in March 9,...

  17. 77 FR 73055 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-12-07

    ... COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70 (b) ``Public... kilograms To fabricate targets The Netherlands. Security Complex. Uranium uranium-235 at CERCA AREVA October... XSNM3730 uranium. targets at the HFR 11006054 Research Reactor in the Netherlands, the BR-2 Reactor...

  18. 78 FR 19520 - Notice of Invitation to Participate In Coal Exploration License Application UTU-89492, UT

    Science.gov (United States)

    2013-04-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Land Management Notice of Invitation to Participate In Coal Exploration License Application UTU-89492, UT AGENCY: Bureau of Land Management, Interior. ACTION: Notice. SUMMARY: All...

  19. 78 FR 7803 - Agency Information Collection Activities: Application-Permit-Special License Unlading-Lading...

    Science.gov (United States)

    2013-02-04

    ... SECURITY U.S. Customs and Border Protection Agency Information Collection Activities: Application-Permit- Special License Unlading-Lading-Overtime Services AGENCY: U.S. Customs and Border Protection, Department... information collection: 1651-0005. SUMMARY: U.S. Customs and Border Protection (CBP) of the Department...

  20. 76 FR 22104 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-04-20

    ... Road, 105, Alexandria, VA 22312, Officers: Shayne L. Berlo, Executive Vice President (Qualifying... Individual), David P. Yeager, CEO, Application Type: Business Structure Change Rapid Express I Corporation...

  1. 76 FR 67188 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-10-31

    ..., Doral, FL ] 33126, Officers: Ramiro M. Ramirez, Jr., Vice President/Director, (Qualifying Individual), Mirna Ramirez, President/Secretary/Treasurer/ Director, Application Type: Add OFF Service....

  2. 77 FR 28880 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-05-16

    ..., Inglewood, CA 90301, Officers: Edison Chen, Manager (Qualifying Individual), Wei-Nung (Janus) Lin, Member... A. Case, Vice President (Qualifying Individual), Thomas C. Case, President, Application Type:...

  3. 77 FR 3773 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-01-25

    .... Officers: Ana Serrano, Director (Qualifying Individual), Victor Ortiz, Manager. Application Type: New OFF... (NVO & OFF), 1209 Orange Street, Wilmington, DE 19801. Officers: Frank Xu, Member (Qualifying...

  4. 77 FR 12583 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-01

    ... (NVO), 701 Penhorn Avenue, Unit 1, Secaucus, NJ 07094, Officers: Luciana Line, Secretary (Qualifying...: Luciana Lina, Secretary (Qualifying Individual), Francisco J. Eguiguren, President, Application...

  5. 77 FR 74186 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-12-13

    ... Terrace, Medley, FL 33166, Officers: Hugo E. Martinez, Secretary (QI), Olga P. Martinez, President...: Victor Pezzelato, Vice President Sales (QI), Orit Horn, Managing Member, Application Type: QI...

  6. 75 FR 66099 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-10-27

    ... Castleton Street, Suite 398, City of Industry, CA 91748, Officers: Jennifer X. McCormick, President (Qualifying Individual), Mark R. McCormick, Secretary/ Treasurer, Application Type: QI Change. British.... Fulton, Assistant Secretary (Qualifying Individual), John E. Ferguson, President, Application Type:...

  7. 78 FR 35634 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-06-13

    ...: Stan Sing Lau, Vice President (QI), David Koch, CEO. Application Type: QI Change. Logistics Management..., President. Application Type: QI Change. Daisy Mae Concepcion V. Taleon dba DMT Global Logistics (NVO & OFF... Value International dba JP Global Logistics (NVO & OFF), 377 Oyster Point Blvd., Suite 18, South...

  8. 78 FR 30921 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-05-23

    ...-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF) pursuant to section 19 of the Shipping...), Colin B. Charnock, Secretary, Application Type: Add NVO Service Triple ``B'' Packers & Forwarders, Inc... Beliveau, President (QI), Application Type: Name Change to Triple ``B'' Forwarders, Inc. dba Pacific...

  9. 77 FR 23719 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-20

    ... Hiebendahl, Secretary. Application Type: Name Change/QI Change. Gandhi International Shipping, Inc. (NVO & OFF), 2358 W. Devon Avenue, Chicago, IL 60659. Officers: Mohammed A. Gandhi, President (Qualifying Individual), Azim Gandhi, Secretary. Application Type: Add NVO Serice. King Solutions, Inc. (NVO &...

  10. 77 FR 72863 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-12-06

    ... Francoulon, President. Application Type: Add NVO Service. Kingz International Logistics Inc (OFF), 415 S... telephone at (202) 523-5843 or by email at OTI@fmc.gov . Air 7 Seas Transport Logistics, Inc. (NVO & OFF... & CFO. Application Type: QI Change. All International Solutions Inc. (NVO), 281 E. Redondo Beach...

  11. 75 FR 53282 - Pacific Gas and Electric Company; Notice of Application for Amendment of License, and Soliciting...

    Science.gov (United States)

    2010-08-31

    ... Substation 60 kV transmission line extending between the new Narrows 2 distribution substation to the Smartville Substation from the Project license. The licensee states that this portion of the transmission...

  12. 78 FR 75345 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-12-11

    .... Application Type: QI Change. Cromarti Logistics LLC (NVO), 2810 Grants Lake Blvd., Suite 904, Sugar Land, TX... Change. GPL Logistics, Inc (NVO), 18725 E. Gale Avenue, Suite 250, City of Industry, CA 91748....

  13. 76 FR 4696 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-01-26

    ... (NVO & OFF), 2229 NW. 79 Avenue, Doral, FL 33122. Officers: Paul F. Mendoza, COO (Qualifying Individual), Marcela Mendoza, President. Application Type: QI Change. SAPIA Logistics, Inc. (NVO & OFF), 1331...

  14. 75 FR 72824 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-26

    ... Logistics Group L.L.C. (NVO & OFF), 2229 NW 79th Avenue, Doral, FL 33122, Officers: Paul Mendoza, COO (Qualifying Individual), Marcela Mendoza, President, Application Type: QI Change. NEC Logistics, Ltd. (NVO),...

  15. 78 FR 68444 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-14

    .... (NVO & OFF), 2801 NW 7th Avenue, Suite 107, Miami, FL 33122, Officers: Ricardo Tovar, President (QI), Miguel Tovar, Vice President, Application Type: QI Change. BJJ Enterprise LLC (OFF), 121 North...

  16. 76 FR 70145 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-11-10

    ... & OFF), 6701 NW. 7th Street, 135, Miami, FL 33126. Officers: Maria E. Arias, Vice President (Qualifying..., Secretary (Qualifying Individual), Jorge Zambrano, President/Treasurer. Application Type: New NVO &...

  17. 78 FR 10173 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-02-13

    ... Okolo and David Newton dba Emunah Global (NVO & OFF), 1904 Farnam Street, Suite 610, Omaha, NE 68102, Officers: David D. Newton, Partner (QI), Jerome Okolo, Partner, Application Type: New NVO & OFF...

  18. 78 FR 1863 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-01-09

    ...-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF) pursuant to section 19 of the Shipping.... Jah, President (QI), Application Type: Name Change to Sea Freight Express, Inc. Watercraft Mix, Inc...

  19. 76 FR 71034 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-11-16

    ...-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean Transportation Intermediary (OTI.... Application Type: Name Change. Abco International Freight (USA) Inc. dba Abco Logistics (NVO), 9420 Telstar...

  20. 75 FR 9602 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2010-03-03

    ...-Operating Common Carrier and Ocean Freight Forwarder--Ocean Transportation Intermediary pursuant to section..., (Qualifying Individuals), Gloria Comins, Member. Lars Courier, Inc. dba Lars International Freight Forwarders... Ocean Freight Forwarder Transportation Intermediary Applicants Intertrans Express (NY), Inc., 10 East...

  1. 78 FR 24200 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-04-24

    ... Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF) pursuant to section 19...), Raymond M. Greer, President, Application Type: QI Change Crescent Air Freight, Ltd. (NVO & OFF), 145 Hook...

  2. 78 FR 50054 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-16

    ..., ] Parkville, MO 64152, Officers:, Matthew P. Weiss, Vice President (QI), Chad Earwood, President, Application..., LLC (OFF), 5200 Dallas Highway, Suite 200 301, Powder Springs, GA 30127, Officers:, Mark Weimann...

  3. 75 FR 51074 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-18

    ..., President, (Qualifying Individual), Application Type: Add Trade Name. CLA Investment & Development, Inc. dba CLA Shipping, Inc., (NVO & OFF), 129 S. 8th Avenue, C, La Puente, CA 91746. Officers: Hong...

  4. 75 FR 20997 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-04-22

    ... Individual). Won S. Jang, President/CEO/Secretary, Application Type: QI Change. Intertrade Systems Inc. (OFF... Name Change. SCM Solutions Corp. (OFF), 32938 Tamina Road, Suite 100, Magnolia, TN 77354....

  5. 75 FR 48686 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-11

    ... Systems, Inc. dba MILS dba Fesco Integrated Transport (NVO & OFF), 1000 Second Avenue, Suite 1310, Seattle... (Qualifying Individual), Kenryo Senda, President/CEO, Application Type: QI Change. Praxis SCM, LLC (NVO &...

  6. 75 FR 53696 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-09-01

    ... (Qualifying Individual), Torri Hideyuki, President. Application Type: Add NVO Service. Norma's Cargo Solutions, LLC (NVO & OFF), 5665 SW 8th Street, Miami, FL 33134. Officer: Norma A. Pineiro, Managing...

  7. 76 FR 67730 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-02

    ...: Add NVO Service G Max Distributors Inc. (NVO), 6979 NW 84 Avenue Miami, FL 33166, Officers: Hugo D. Carmona, Secretary (Qualifying Individual), Victor Lopez, President, Application Type: New NVO &...

  8. Application Coherency Manager Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposal describes an Application Coherency Manager that implements and manages the interdependencies of simulation, data, and platform information. It will...

  9. 77 FR 32115 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-05-31

    ... OTI@fmc.gov . Agunsa Logistics & Distribution (Los Angeles), Inc. (NVO & OFF), 19600 South Alameda...), Rodrigo Jimenez, President, Application Type: QI Change. ] American Global Logistics LLC dba AGL (NVO..., Inc. dba CFS Logistics (NVO), 455 E. State Parkway, 105, Schaumburg, IL 60173, Officers: Kook (A.K.A...

  10. 76 FR 59128 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-09-23

    ... at OTI@fmc.gov . APLUS Worldwide Logistics, Corp. (NVO & OFF), 2129 NW., 79th Avenue, Doral, FL 33122... Individual) Akira Tsuneda, Director/COB. Application Type: QI Change. Contour Logistics Inc. (NVO & OFF... Energy & Marine Services LLC (NVO & OFF), 16607 Central Green Blvd., 200, Houston, TX 77032....

  11. 75 FR 6398 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-02-09

    ...-Operating Common Carrier and Ocean Freight Forwarder--Ocean Transportation Intermediary pursuant to section.../Managing Director. Non-Vessel-Operating Common Carrier and Ocean Freight Forwarder Transportation... Ocean Freight Forwarder Transportation Intermediary Applicants (Cont'd): Vortex Worldwide Logistics Corp...

  12. 76 FR 41258 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-07-13

    .... LTA Import & Export, Inc. (NVO & OFF), 14331 SW 120th Street, 203, Miami, FL 33186. Officers: Eric E..., Managing Member (Qualifying Individual), Bradley D. Louden, Managing Member. Application Type: Name Change...: Rodney A. Gonzalez, Secretary (Qualifying Individual), James W. Coley, Managing...

  13. 77 FR 50688 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-08-22

    ..., President. Application Type: QI Change. Transera International Logistics (OFF), 10343 Sam Houston Park Drive... telephone at (202) 523-5843 or by email at OTI@fmc.gov . Anselm K. Nwankwo dba Anze Global Logistics (NVO... Logistics Inc. (NVO & OFF), 288 West 238th Street 5h, Bronx, NY 10463. Officer: Angel N. Espinoza,...

  14. 77 FR 20398 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-04-04

    ... Type: QI Change. Alternative Global Logistic, LLC (OFF), 8551 NW. 12th Street, Pembroke Pines, FL 33024..., Memphis, TN 38118, Officers: Patrick W. DePriest, Vice President Export Operations, (Qualifying Individual...), David G. Pirtskhalava, Vice President, Application Type: Business Structure Change. Pinki...

  15. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Science.gov (United States)

    2010-10-01

    ... operating with non-U.S. licensed space stations. 25.137 Section 25.137 Telecommunication FEDERAL... space stations. (a) Earth station applicants or entities filing a “letter of intent” or “Petition for Declaratory Ruling” requesting authority to operate with a non-U.S. licensed space station to serve the...

  16. 78 FR 14842 - Crystal River Nuclear Generating Plant, Unit 3; Application for Renewal of License to Facility...

    Science.gov (United States)

    2013-03-07

    ... COMMISSION Crystal River Nuclear Generating Plant, Unit 3; Application for Renewal of License to Facility... operate the Crystal River Nuclear Generating Plant, Unit 3 (CR3), at 2609 megawatts thermal. The FPC... located near Crystal River, FL; the current operating license for the CR3 expires on December 3, 2016. The...

  17. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  18. Bavarian liquid hydrogen bus demonstration project - safety, licensing and acceptability aspects

    Energy Technology Data Exchange (ETDEWEB)

    Wurster, R.; Knorr, H.; Pruemm, W.

    1999-07-01

    A regular 12 m city bus of the MAN SL 202 type with an internal combustion engine adapted to hydrogen operation and auxiliary gasoline operation was demonstrated in the Bavarian cities of Erlangen and Munich between April 1996 and August 1998. Three bus operators, Erlanger Stadtwerke, Stadtwerke Muenchen and Autobus Oberbayern were testing the bus in three different operating schemes. In order to be able to perform this worldwide first public demonstration of a liquid hydrogen (LH{sub 2}) city bus in regular service, several requirements with respect to safety, licensing, training and acceptability had to be fulfilled. These activities were focusing mainly on the hydrogen specific issues such as (a) integration of onboard LH{sub 2} storage vessels, piping and instrumentation, (b) implementation of storage and refueling infrastructure in the operators' yards, (c) adaptation of the maintenance garages, (d) training of operating and maintenance personnel. During phase II of the demonstration activity a poll was performed on passengers traveling onboard the hydrogen-powered city bus in order to determined the level of acceptance among the users of the bus. The bus was designed and manufactured by MAN Nutzfahrzeuge Aktiengesellschaft. The cryogenic fuel storage and the refueling equipment were designed and manufactured by Linde AG. The realization of the hardware was financially supported by the European Commission (EC) within the Euro-Quebec Hydro-Hydrogen Pilot Project. The demonstration phase was financially supported by EC and the Bavarian State Government. Ludwig-Boelkow-Systemtechnik performed project monitoring for both funding organizations. The presentation will summarize the most important results of this demonstration phase and will address the measures undertaken in order to get the bus, the refueling infrastructure and the maintenance and operating procedures approved by the relevant authorities.

  19. 77 FR 73060 - Standard Review Plan for Review of Fuel Cycle Facility License Applications

    Science.gov (United States)

    2012-12-07

    ...The U.S. Nuclear Regulatory Commission (NRC) is planning to revise NUREG-1520, Revision 1, ``Standard Review Plan (SRP) for the Review of a License Application for a Fuel Cycle Facility.'' The staff proposes to revise NUREG-1520 to provide guidance and further clarify several technical areas. In addition to revising NUREG-1520, the staff is also planning to issue Interim Staff Guidance (ISG)......

  20. Licensing an assured isolation facility for low-level radioactive waste. Volume 2: Recommendations on the content and review of an application

    Energy Technology Data Exchange (ETDEWEB)

    Silverman, D.J.; Bauser, M.A. [Morgan, Lewis and Bockius, Washington, DC (United States); Baird, R.D. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application.

  1. 77 FR 16077 - License Amendment Request From Westinghouse Electric Company, LLC, Hematite Decommissioning Project

    Science.gov (United States)

    2012-03-19

    ... regulated by the Idaho Department of Environmental Quality and is not an NRC-licensed facility. Pursuant to....309(c)(1)(i)(viii). A State, county, municipality, Federally-recognized Indian tribe, or agencies...

  2. 77 FR 23241 - Lock+ Hydro Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2012-04-18

    ... Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XXX, LLC; Notice of Intent To File License... Friends Fund XXX, LLC. e. Name of Project: New Cumberland Locks and Dam Hydroelectric Project. f. Location... XXX, c/o Hydro Green Energy, LLC, 900 Oakmont Lane, Suite 310, Westmont, IL 60559; (877) 556-6566...

  3. Hydropower Licensing as a Bridge between Climate Science and Applications: Creating Actionable Science for Regulatory Decisionmaking

    Science.gov (United States)

    Ray, A. J.; Barsugli, J. J.; Walker, S. H.

    2016-12-01

    The Integrated Licensing Process (ILP) of the US Federal Energy Regulatory Commission (FERC) is an example of an existing regulatory process that has the capacity to bridge the gap between science and decision making by clearly delineating existing science, the climate-regulatory nexus, and additional scientific work needed to inform licensing or relicensing of non-federal hydropower projects. In a parallel, but interacting set of legal and regulatory processes, NOAA's National Marine Fisheries Service (NMFS) must conduct analyses based on the best available science in order to implement the requirements of the Endangered Species Act (ESA), the Magnuson-Stevens Act, and NEPA, and to develop terms and conditions to protect fisheries for the 30-50 year term of the license and the longer life of the project itself. Therefore, NMFS must understand the combined effects of hydropower projects and climate change to fulfill its own mandates to protect anadromous fish, protected species and habitat. Federal Executive Order (EO) #13693 on climate change sustainability require use of climate risks in planning, also recommended in NOAA's own guidance on implementing ESA, and the Council on Environmental Quality (CEQ) guidance on implementing NEPA; however, as an independent agency FERC is not subject to that EO. In the past, FERC has consistently rejected NMFS' climate study requests, stating, among other reasons, that climate science is `too uncertain,' and therefore not actionable. Thus, in order for NMFS to get the information needed for its own decision process, NOAA must first persuade FERC that the science is actionable. This presentation will describe our experiences in a multi-year effort by an interdisciplinary team of climate and fishery scientists to develop acceptable climate study requests that address FERC's concerns about uncertainty, for the Susitna-Watana project on Alaska's Susitna River, the LaGrange Project on the Tuolumne R. in California, and the Hiram

  4. Project Portfolio Management Prototype Application Design

    OpenAIRE

    Paul POCATILU

    2007-01-01

    The management of project portfolio in a company requires the use of specific software, especially when the number of projects is significant. This paper is based on the Methodology for the development of IT projects portfolio management applications research project. This paper presents some of the results of a project portfolio application design.

  5. Project Portfolio Management Prototype Application Design

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available The management of project portfolio in a company requires the use of specific software, especially when the number of projects is significant. This paper is based on the Methodology for the development of IT projects portfolio management applications research project. This paper presents some of the results of a project portfolio application design.

  6. Application of phase stretch transform to plate license identification under blur and noise conditions (Conference Presentation)

    Science.gov (United States)

    Asghari, Hossein; Hadar, Ofer; Jalali, Bahram

    2016-09-01

    This paper deals with implementing a new algorithm for edge detection based on the Phase Stretch Transform (PST) for purposes of car plate license recognition. In PST edge detection algorithm, the image is first filtered with a spatial kernel followed by application of a nonlinear frequency-dependent phase. The output of the transform is the phase in the spatial domain. The main step is the 2-D phase function which is typically applied in the frequency domain. The amount of phase applied to the image is frequency dependent with higher amount of phase applied to higher frequency features of the image. Since sharp transitions, such as edges and corners, contain higher frequencies, PST emphasizes the edge information. Features can be further enhanced by applying thresholding and morphological operations. Here we investigate the influence of noise and blur on the ability to recognize the characters in the plate license, by comparison of our suggested algorithm with the well known Canny algorithm. We use several types of noise distributions among them, Gaussian noise, salt and paper noise and uniform distributed noise, with several levels of noise variances. The simulated blur is related to the car velocity and we applied several filters representing different velocities of the car. Another interesting degradation that we intend to investigate is the cases that Laser shield license plate cover is used to distort the image taken by the authorities. Our comparison results are presented in terms of True positive, False positive and False negative probabilities.

  7. Expert system application education project

    Science.gov (United States)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  8. 75 FR 15701 - Georgia Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-03-30

    ... inspection: a. Application Type: Non-project use of project lands and waters. b. Project No: 1951-169. c... Street, NE., Washington, DC 20426. For more information on how to submit these types of filings, please... wooden sea wall; and dredging of 212 cubic yards of sediment. The amount of concrete and asphalt...

  9. 77 FR 55814 - Exelon Generation Company, LLC; Notice of Application for Amendment of License and Soliciting...

    Science.gov (United States)

    2012-09-11

    ... Bottom Atomic Power Station and Muddy Run Pumped Storage Project. Including plant leakage in the minimum... hydroelectric application has been filed with the Commission and is available for public inspection: a... Hydroelectric Project. f. Location: The Conowingo Project is located on the Susquehanna River in Harford and...

  10. Optimal Licensing for Public Intellectual Property: Theory and Application to Plant Variety Patents

    OpenAIRE

    Julian M. Alston; Plakias, Zoe T.

    2014-01-01

    In the United States, public universities may choose to license a plant variety to a limited number of producers (an exclusive license) or to an unlimited number of producers (an open license). This choice has implications for the quantity and distribution of total benefits from the variety. Universities have traditionally released new apple varieties under open licenses, but several universities have now begun exploring or implementing exclusive licensing. In this paper, we consider the choi...

  11. Obstructive sleep apnea risk for driving license applicants in India - A community based study.

    Science.gov (United States)

    Dubey, Abhishek; Bajaj, Darshan K; Mishra, Apurva; Singh, Balendra Pratap; Gupta, Vinay; Kant, Surya; Dixit, Swati

    2017-08-31

    To determine the risk of obstructive sleep apnea (OSA) for male permanent driving license (DL) applicants of Lucknow, India. In this cross-sectional community based, study body mass index, waist-hip ratio, blood pressure of each subject were determined as an anthropometric parameter along with the history of habit of smoking, tobacco chewing, alcohol consumption. STOP-Bang (Snoring, Tired or sleepy, Observed apnea, high blood Pressure, Body mass index, Age, Neck, Gender) Questionnaire - a scoring risk assessment tool - was applied for assessment of OSA risk (high OSA risk defined by score ≥ 3) for 542 male DL recipients at 2 Regional Transport Office (RTO) centers in Lucknow, India. The statistical software SPSS 17.0 was applied to the testing. In total 23% (N = 125) of participants were found with the risk of OSA. High blood pressure (≥ 140/90 mm Hg) was found for the maximum number of participants (40.5%) followed by neck circumference > 40 cm (17.1%), age (> 50 years old) (15.3%), snoring (12.3%) and tired/sleepy (10.5%). Mean values of age, anthropometric measurements and blood pressure were observed significantly higher (p 45 years old). In view of findings of this study a high number of male driving license applicants were observed with the risk of OSA. Therefore efforts should be made to develop a national screening guideline/protocol for the OSA risk assessment for driving license applicants in India. This may reduce the possibility of road traffic accidents due to the OSA-associated fatigue and drowsiness behind the wheels. Int J Occup Med Environ Health 2018;31(1).

  12. 75 FR 16090 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-03-31

    ... Energy Regulatory Commission Grand River Dam Authority; Notice of Application for Amendment of License.... Date Filed: March 11, 2010, supplemented on March 17, 2010. d. Applicant: Grand River Dam Authority. e.... 791a-825r. h. Applicant Contact: Ms. Tamara E. Jahnke, Assistant General Council, Grand Dam...

  13. 78 FR 75376 - Entergy Operations, Inc.; Combined License Application for River Bend Unit 3, Exemption From the...

    Science.gov (United States)

    2013-12-11

    ... Combined License (COL) application. The NRC staff reviewed this request and determined that it is... coincident with, the resumption of the COL application review or by December 31, 2014, whichever comes first... Background On September 25, 2008, EOI submitted to the NRC a COL application for one Economic...

  14. 78 FR 75379 - Entergy Operations, Inc.; Combined License Application for Grand Gulf Unit 3; Exemption From the...

    Science.gov (United States)

    2013-12-11

    ... Combined License (COL) application. The NRC staff reviewed this request and determined that it is... coincident with, the resumption of the COL application review or by December 31, 2014, whichever comes first... Background On February 27, 2008, EOI submitted to the NRC a COL application for one Economic...

  15. Licensing the ACR-700 in the USA; progress on the pre-application review

    Energy Technology Data Exchange (ETDEWEB)

    Ion, R. [Atomic Energy of Canada Ltd., Mississauga, Ontario (Canada); Langman, V. [AECL Technologies, Gaithersburg, Maryland (United States); Snell, V. [Atomic Energy of Canada Ltd., Mississauga, Ontario (Canada); Reid, C. [Bechtel Power Corp., San Francisco, California (United States)

    2004-07-01

    The ACR-700 is an evolutionary reactor design, which incorporates the inherent safety features of the CANDU products, as well as the successful operating experience of the current CANDU 6 reactors. The improvements to the ACR-700 from CANDU 6 result in significant reductions in capital and operating costs as well as enhanced safety. AECL Technologies (AECLT, a wholly owned US subsidiary of Atomic Energy of Canadian Limited) is the proponent for a pre-application review of the ACR-700 with the US Nuclear Regulatory Commission (NRC) in the United States. This pre-application review will be completed shortly and will support an application to the US NRC for Standard Design Certification (SDC). AECL Technologies' overall objective for the pre-application review of the ACR-700 is to obtain an understanding, from interactions with the USNRC, of the scope, cost, and the schedule to obtain a Standard Design Certification for the ACR-700. The pre-application review will address licensing issues associated with the CANDU reactor technologies in ACR-700 that depart from the light water reactor, pressure-vessel based regulatory framework in the USA. Therefore, during the course of the pre-application review, any major US NRC issues with the ACR-700 design will be identified early and the scope of the work required to address these concerns, along with associated completion schedules, will be formulated and ultimately agreed upon with the US NRC. AECLT has been informed by the NRC staff that the results of their pre-application review will be documented in a Safety Assessment Report (SAR), which will state whether there are any major impediments to licensing the ACR in the United States. In particular, the SAR should provide confirmation of the licensing criteria applicable to the ACR, provide an assessment of the completeness of AECL 's Research and Development (R and D) programs that exist or are planned in support of the ACR, provide an assessment of the

  16. Model tracking system for low-level radioactive waste disposal facilities: License application interrogatories and responses

    Energy Technology Data Exchange (ETDEWEB)

    Benbennick, M.E.; Broton, M.S.; Fuoto, J.S.; Novgrod, R.L.

    1994-08-01

    This report describes a model tracking system for a low-level radioactive waste (LLW) disposal facility license application. In particular, the model tracks interrogatories (questions, requests for information, comments) and responses. A set of requirements and desired features for the model tracking system was developed, including required structure and computer screens. Nine tracking systems were then reviewed against the model system requirements and only two were found to meet all requirements. Using Kepner-Tregoe decision analysis, a model tracking system was selected.

  17. 78 FR 64553 - License Amendment Request for Homestake Mining Company of California, Grants Reclamation Project...

    Science.gov (United States)

    2013-10-29

    ... measure radon-222 concentrations in air. DATES: A request for a hearing or petition for leave to intervene... (HMC's or Licensee's) license to change the background monitoring location used to measure radon-222.... ML13281A790. HMC-16 was identified in Table 1 as the background radon-222 monitoring location in HMC's...

  18. NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER

    Energy Technology Data Exchange (ETDEWEB)

    Mark Holbrook

    2010-09-01

    The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

  19. 47 CFR 1.945 - License grants.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false License grants. 1.945 Section 1.945... Applications and Proceedings Application Requirements and Procedures § 1.945 License grants. (a) License grants—auctionable license applications. Procedures for grant of licenses that are subject to competitive...

  20. 78 FR 69402 - Lock 7 Hydro Partners, LLC; Notice of Application for Amendment of License and Soliciting...

    Science.gov (United States)

    2013-11-19

    ... generating unit No. 2. The runner replacement would increase the installed and hydraulic capacities of the... installed capacity would change from 2,040 kW to 2,210 kW and its hydraulic capacity from 2,229 cfs to 2,386... relate to project works which are the subject of the license amendment. Agencies may obtain copies of...

  1. 76 FR 62398 - Northern States Power Company; Notice of Application To Amend License and Accepted for Filing...

    Science.gov (United States)

    2011-10-07

    ... increase by 1,400 kW [from 36,000 kW to 39,000 kW] and the maximum hydraulic capacity would increase by 720... relate to project works which are the subject of the license surrender. Agencies may obtain copies of...

  2. Spent Nuclear Fuel Project path forward: nuclear safety equivalency to comparable NRC-licensed facilities

    Energy Technology Data Exchange (ETDEWEB)

    Garvin, L.J.

    1995-11-01

    This document includes the Technical requirements which meet the nuclear safety objectives of the NRC regulations for fuel treatment and storage facilities. These include requirements regarding radiation exposure limits, safety analysis, design and construction. This document also includes administrative requirements which meet the objectives of the major elements of the NRC licensing process. These include formally documented design and safety analysis, independent technical review, and oppportunity for public involvement.

  3. 78 FR 4465 - PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant; Exemption

    Science.gov (United States)

    2013-01-22

    ... COMMISSION PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant; Exemption 1.0... Approvals for Nuclear Power Plants.'' This reactor is to be identified as Bell Bend Nuclear Power Plant... (RCOL) application for UniStar's Calvert Cliffs Nuclear Power Plant, Unit 3 (CCNPP3). The......

  4. 76 FR 81992 - PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant; Exemption

    Science.gov (United States)

    2011-12-29

    ... COMMISSION PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant; Exemption 1.0..., Certifications, and Approvals for Nuclear Power Plants.'' This reactor is to be identified as Bell Bend Nuclear Power Plant (BBNPP), in Salem County, Pennsylvania. The BBNPP COL application incorporates by...

  5. 75 FR 61458 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-10-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Grand River Dam Authority; Notice of Application for Amendment of License.... Date Filed: May 27, 2010, supplemented on August 12 and August 16, 2010. d. Applicant: Grand River...

  6. 77 FR 21761 - Alice Falls Corporation, Alice Falls Hydro, LLC; Notice of Application for Transfer of License...

    Science.gov (United States)

    2012-04-11

    ... Energy Regulatory Commission Alice Falls Corporation, Alice Falls Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On February 23, 2012, Alice Falls Corporation (transferor) and Alice Falls Hydro, LLC (transferee) filed an ] application for transfer...

  7. 76 FR 18745 - Appalachian Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2011-04-05

    ... Pumped Storage Project f. Location: Headwaters of the Roanoke River, in Bedford, Campbell, Franklin, and... hydroelectric application has been filed with the Commission and is available for public inspection: a...

  8. Project Assessment Skills Web Application

    Science.gov (United States)

    Goff, Samuel J.

    2013-01-01

    The purpose of this project is to utilize Ruby on Rails to create a web application that will replace a spreadsheet keeping track of training courses and tasks. The goal is to create a fast and easy to use web application that will allow users to track progress on training courses. This application will allow users to update and keep track of all of the training required of them. The training courses will be organized by group and by user, making readability easier. This will also allow group leads and administrators to get a sense of how everyone is progressing in training. Currently, updating and finding information from this spreadsheet is a long and tedious task. By upgrading to a web application, finding and updating information will be easier than ever as well as adding new training courses and tasks. Accessing this data will be much easier in that users just have to go to a website and log in with NDC credentials rather than request the relevant spreadsheet from the holder. In addition to Ruby on Rails, I will be using JavaScript, CSS, and jQuery to help add functionality and ease of use to my web application. This web application will include a number of features that will help update and track progress on training. For example, one feature will be to track progress of a whole group of users to be able to see how the group as a whole is progressing. Another feature will be to assign tasks to either a user or a group of users. All of these together will create a user friendly and functional web application.

  9. 75 FR 61457 - Duke Energy Carolinas, LLC; Notice of Application for Amendment of License, and Soliciting...

    Science.gov (United States)

    2010-10-05

    ... Pumped-Storage Project. f. Location: The project is located on the Keowee, Little, Whitewater, Toxaway... runner replacements and related work for Units 1 and 2 of the Jocassee Pumped Storage Development... following hydroelectric application has been filed with the Commission and is available for public...

  10. Sustainability Through Technology Licensing and Commercialization: Lessons Learned from the TRIAD Project.

    Science.gov (United States)

    Payne, Philip R O

    2014-01-01

    Ongoing transformation relative to the funding climate for healthcare research programs housed in academic and non-profit research organizations has led to a new (or renewed) emphasis on the pursuit of non-traditional sustainability models. This need is often particularly acute in the context of data management and sharing infrastructure that is developed under the auspices of such research initiatives. One option for achieving sustainability of such data management and sharing infrastructure is the pursuit of technology licensing and commercialization, in an effort to establish public-private or equivalent partnerships that sustain and even expand upon the development and dissemination of research-oriented data management and sharing technologies. However, the critical success factors for technology licensing and commercialization efforts are often unknown to individuals outside of the private sector, thus making this type of endeavor challenging to investigators in academic and non-profit settings. In response to such a gap in knowledge, this article will review a number of generalizable lessons learned from an effort undertaken at The Ohio State University to commercialize a prototypical research-oriented data management and sharing infrastructure, known as the Translational Research Informatics and Data Management (TRIAD) Grid. It is important to note that the specific emphasis of these lessons learned is on the early stages of moving a technology from the research setting into a private-sector entity and as such are particularly relevant to academic investigators interested in pursuing such activities.

  11. 47 CFR 5.71 - License period.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false License period. 5.71 Section 5.71...) Applications and Licenses § 5.71 License period. (a) The regular license period for stations in the Experimental Radio Service is either 2 or 5 years. An applicant desiring to apply for a 5-year license...

  12. 77 FR 36012 - PPL Bell Bend, LLC; Bell Bend Nuclear Power Plant Combined License Application; Notice of Intent...

    Science.gov (United States)

    2012-06-15

    ... COMMISSION PPL Bell Bend, LLC; Bell Bend Nuclear Power Plant Combined License Application; Notice of Intent... its Bell Bend Nuclear Power Plant (BBNPP) site, located west of the existing Susquehanna Steam... by relocating the power block footprint and other plant components. For purposes of developing...

  13. 77 FR 35079 - License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC

    Science.gov (United States)

    2012-06-12

    .... Address questions about NRC dockets to Carol Gallagher; telephone: 301-492- 3668; email: Carol.Gallagher... INFORMATION CONTACT: Mr. Michael Wentzel, Division of License Renewal, Office of Nuclear Reactor Regulation, U...: michael.wentzel@nrc.gov . SUPPLEMENTARY INFORMATION: Discussion NextEra submitted an application...

  14. 76 FR 81994 - UniStar Nuclear Energy; Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit...

    Science.gov (United States)

    2011-12-29

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION UniStar Nuclear Energy; Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit 3; Exemption 1.0 Background: UniStar Nuclear Energy (UNE) submitted to the U.S. Nuclear Regulatory...

  15. 76 FR 11522 - In the Matter of Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear...

    Science.gov (United States)

    2011-03-02

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION In the Matter of Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear... relating to pending appeal filed by the Nuclear Regulatory Commission staff in this case. Mr. Dehmel has...

  16. 75 FR 16091 - Glen Falls Hydro, LLC; Essex Energy Partners, LLC; Notice of Application for Transfer of License...

    Science.gov (United States)

    2010-03-31

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Glen Falls Hydro, LLC; Essex Energy Partners, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene March 24, 2010. On March 8,...

  17. 75 FR 69063 - Port Bailey Wild Enterprises, LLC; PB Energy, Inc.; Notice of Application for Transfer of License...

    Science.gov (United States)

    2010-11-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Port Bailey Wild Enterprises, LLC; PB Energy, Inc.; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene November 3, 2010. On...

  18. Technology licensing by advertising supported media platforms: An application to internet search engines

    OpenAIRE

    Sapi, Geza; Suleymanova, Irina

    2011-01-01

    We develop a duopoly model with advertising supported platforms and analyze incentives of a superior firm to license its advanced technologies to an inferior rival. We highlight the role of two technologies characteristic for media platforms: The technology to produce content and to place advertisements. Licensing incentives are driven solely by indirect network effects arising fromthe aversion of users to advertising. We establish a relationship between licensing incentives and the nature of...

  19. Revocation of General Safety Test Regulations That Are Duplicative of Requirements in Biologics License Applications. Final rule.

    Science.gov (United States)

    2015-07-02

    The Food and Drug Administration (FDA) is amending the biologics regulations by removing the general safety test (GST) requirements for biological products. FDA is finalizing this action because the existing codified GST regulations are duplicative of requirements that are also specified in biologics license applications (BLAs), or are no longer necessary or appropriate to help ensure the safety, purity, and potency of licensed biological products. FDA is taking this action as part of its retrospective review of its regulations to promote improvement and innovation, in response to the Executive order.

  20. Methodology of licensing for field applications of Weld Inlay and Ultrasonic Nanocrystal Surface Modification

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Hong Seok; Jung, Kwang Woon [KEPCO KPS, Naju (Korea, Republic of); Park, Ik Keun [Seoul National Univ, Seoul (Korea, Republic of); Pyun, Young Sik [Sun Moon University, Asan (Korea, Republic of)

    2015-10-15

    There are many attempts to relieve or change high tensile residual stress to compressive residual stress for a mitigation of PWSCC. LSP(Laser Shot Peening) and WJP(Water Jet Peening) have been applied in several NPPs of Japan and technical and topical reports under Materials Reliability Program of EPRI(Electric Power Research Institute ) USA have been developed. Weld Inlay technology and UNSM(Ultrasonic Nanocrystal Surface Modification) technology using ultrasonic vibration energy as the method for a mitigation of tensile residual stress generated after Weld Inlay have been developing in Korea. So in this study, the methodology of licensing for field application of these technologies is suggested. The results of residual stress measured before and after UNSM for Weld Inlay specimens using UNSM equipment of domestic source technology holdings to obtain an equivalent effect, which has the simplification of equipment and the flexibility of field application in comparison with LSP and WJP, indicated to obtain a mitigation effect of residual stress until 0.5 mm of surface depth. In order to accomplish field application of Weld Inlay that the Code Case was already developed, the approval of a regulation agency through the preparation of TR or RR based on ASME Code Case N-766, N-803 is necessary.

  1. Applicability of IBAMA normative instruction 146-2007 to pipeline environmental licensing

    Energy Technology Data Exchange (ETDEWEB)

    Basbaum, Marcos A.; Fonseca, Renata A.A. [Servicos de Engenharia Emilio Baumgart Ltda. (SEEBLA), Rio de Janeiro, RJ(Brazil)], e-mail: mbasbaum.seebla@petrobras.com.br, e-mail: renataamorim.seebla@petrobras.com.br; Torggler, Bianca F.; Fernandes, Renato; Guimaraes, Ricardo Z.P. [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)], e-mail: torggler@petrobras.com.br, e-mail: renatofer@petrobras.com.br, e-mail: rzaluar@petrobras.com.br

    2009-07-01

    PETROBRAS has been conducting several wildlife programs in response to environmental licensing requirements from IBAMA (Brazilian environmental agency). Since 2007, IBAMA has been requiring the application of the Normative Instruction n. 146 (NI), which establishes criteria for wildlife management in the influence areas of new enterprises. However, experience from PETROBRAS has shown that many of the NI articles are not applicable to pipelines. Thus, a critical analysis of this NI was done based on data from company's wildlife programs. Our analysis indicated that the main NI items that do not apply to pipelines are: 1 - Animal rescue programs in deforested areas and selection of release areas, 2 - More than two fauna monitoring campaigns a year, 3 - Monitoring programs involving all groups of terrestrial vertebrates and also invertebrate classes. The non-applicability of these items is due to: 1 - The majority of pipelines are built in areas without significant native vegetation or with small fragments only, which are usually in secondary stage of ecological succession. Most pipelines scarcely involve removal of primary vegetation, 2 - Pipelines have an influence area restricted to a range of 800 m and the construction directly affects only strips from 20 m to 30 m, 3 - The most relevant impacts associated with pipelines are temporary, and do not persist during their operation. (author)

  2. 75 FR 62592 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Science.gov (United States)

    2010-10-12

    ... amendments to the Renewed Facility Operating Licenses include: (1) The proposed Cyber Security Plan for CCNPP... implement and maintain in effect all provisions of the Nuclear Regulatory Commission-approved Cyber Security... cyber security program. This regulation specifically requires each licensee currently licensed...

  3. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Science.gov (United States)

    2010-10-01

    ... endorsement. 13.9 Section 13.9 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO..., the following persons are eligible to apply for commercial radio operator licenses: (1) Any person..., no person shall be eligible to be issued a commercial radio operator license when (i) The...

  4. A Retrospective Evaluation of the Use of Mass Spectrometry in FDA Biologics License Applications

    Science.gov (United States)

    Rogstad, Sarah; Faustino, Anneliese; Ruth, Ashley; Keire, David; Boyne, Michael; Park, Jun

    2016-11-01

    The characterization sections of biologics license applications (BLAs) approved by the United States Food and Drug Administration (FDA) between 2000 and 2015 were investigated to examine the extent of the use of mass spectrometry. Mass spectrometry was found to be integral to the characterization of these biotherapeutics. Of the 80 electronically submitted monoclonal antibody and protein biotherapeutic BLAs included in this study, 79 were found to use mass spectrometric workflows for protein or impurity characterization. To further examine how MS is being used in successful BLAs, the applications were filtered based on the type and number of quality attributes characterized, the mass spectrometric workflows used (peptide mapping, intact mass analysis, and cleaved glycan analysis), the methods used to introduce the proteins into the gas phase (ESI, MALDI, or LC-ESI), and the specific types of instrumentation used. Analyses were conducted over a time course based on the FDA BLA approval to determine if any trends in utilization could be observed over time. Additionally, the different classes of protein-based biotherapeutics among the approved BLAs were clustered to determine if any trends could be attributed to the specific type of biotherapeutic.

  5. 47 CFR 78.29 - License period.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false License period. 78.29 Section 78.29... SERVICE Applications and Licenses § 78.29 License period. Licenses for CARS stations will be issued for a period not to exceed five (5) years. On and after February 1, 1966, licenses for CARS stations...

  6. Licensing schedule for away-from-reactor (AFR) spent fuel storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gray, P.L.

    1981-08-01

    The Nuclear Regulatory Commission has authority to issue licenses for Away-From-Reactor (AFR) installations for the storage of spent nuclear fuel. This report presents a detailed estimate of the time required to prosecute a licensing action. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention.

  7. The Swedish radiological environmental protection regulations applied in a review of a license application for a geological repository for spent nuclear fuel.

    Science.gov (United States)

    Andersson, Pål; Stark, Karolina; Xu, Shulan; Nordén, Maria; Dverstorp, Björn

    2017-04-17

    For the first time, a system for specific consideration of radiological environmental protection has been applied in a major license application in Sweden. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a geological repository for spent nuclear fuel at the Forsmark site. The license application is supported by a post-closure safety assessment, which in accordance with regulatory requirements includes an assessment of environmental consequences. SKB's environmental risk assessment uses the freely available ERICA Tool. Environmental media activity concentrations needed as input to the tool are calculated by means of complex biosphere modelling based on site-specific information gathered from site investigations, as well as from supporting modelling studies and projections of future biosphere conditions in response to climate change and land rise due to glacial rebound. SKB's application is currently being reviewed by the Swedish Radiation Safety Authority (SSM). In addition to a traditional document review with an aim to determine whether SKB's models are relevant, correctly implemented and adequately parametrized, SSM has performed independent modelling in order to gain confidence in the robustness of SKB's assessment. Thus, SSM has used alternative stylized reference biosphere models to calculate environmental activity concentrations for use in subsequent exposure calculations. Secondly, an alternative dose model (RESRAD-BIOTA) is used to calculate doses to biota that are compared with SKB's calculations with the ERICA tool. SSM's experience from this review is that existing tools for environmental dose assessment are possible to use in order to show compliance with Swedish legislation. However, care is needed when site representative species are assessed with the aim to contrast them to generic reference organism. The alternative modelling of environmental concentrations resulted in much lower

  8. A BWR licensing experience in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J.; Ogura, C. [Toshiba America Nuclear Energy, Charlotte, North Carolina (United States); Arai, K. [Toshiba Corporation, Yokohama, Kanagawa (Japan); Thomas, S.; Mookhoek, B., E-mail: jim.powers@toshiba.com [Nuclear Innovation North America, Lake Jackson, Texas (United States)

    2015-09-15

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  9. FCC Universal Licensing System (ULS)

    Data.gov (United States)

    Federal Communications Commission — The Universal Licensing System allows electronic filing of applications processed by the Commission. The ULS allows you to indicate the application purpose and radio...

  10. Development of probabilistic RESRAD computer codes for NRC decommissioning and license termination applications.

    Energy Technology Data Exchange (ETDEWEB)

    Chen, S. Y.; Yu, C.; Mo. T.; Trottier, C.

    2000-10-17

    In 1999, the US Nuclear Regulatory Commission (NRC) tasked Argonne National Laboratory to modify the existing RESRAD and RESRAD-BUILD codes to perform probabilistic, site-specific dose analysis for use with the NRC's Standard Review Plan for demonstrating compliance with the license termination rule. The RESRAD codes have been developed by Argonne to support the US Department of Energy's (DOEs) cleanup efforts. Through more than a decade of application, the codes already have established a large user base in the nation and a rigorous QA support. The primary objectives of the NRC task are to: (1) extend the codes' capabilities to include probabilistic analysis, and (2) develop parameter distribution functions and perform probabilistic analysis with the codes. The new codes also contain user-friendly features specially designed with graphic-user interface. In October 2000, the revised RESRAD (version 6.0) and RESRAD-BUILD (version 3.0), together with the user's guide and relevant parameter information, have been developed and are made available to the general public via the Internet for use.

  11. 76 FR 58303 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-09-20

    ... Power Station, Unit No. 1 (DBNPS) Technical Specifications (TS) 5.5.8, ``Steam Generator (SG) Program... requirement specific to the OM holding a senior reactor operator (SRO) license. The revised BSEP, Units 1...

  12. 77 FR 76483 - Ocean Transportation Intermediary License Applicants The Commission gives notice that the...

    Science.gov (United States)

    2012-12-28

    ... Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF) pursuant to section 19 of the Shipping Act of 1984 (46 U.S.C. 40101). Notice is also given...

  13. 78 FR 37234 - Notice of Invitation; Coal Exploration License Application NDM 105349, ND

    Science.gov (United States)

    2013-06-20

    ... Office, 5001 Southgate Drive, Billings, Montana. A written notice to participate in the exploration license should be sent to the State Director, BLM Montana State Office, 5001 Southgate Drive, Billings, MT.... BILLING CODE 4310-DN-P...

  14. Increasing Robotic Science Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The project consists of the design, fabrication and testing of two science platforms.  The first is a portable Robonaut-compatible science “toolbox”...

  15. 78 FR 34090 - Lois Von Morganroth; Shiloh Warm Springs Ranch, LLC; Notice of Application for Transfer of...

    Science.gov (United States)

    2013-06-06

    ... of license for the L & M Angus Ranch Project, FERC No. 8498, located on Warm Springs Creek, a... license for the L & M Angus Ranch Project from the transferor to the transferee. Applicants' Contact: For...

  16. Applicability of Item Response Theory to the Korean Nurses' Licensing Examination

    Directory of Open Access Journals (Sweden)

    Geum-Hee Jeong

    2005-06-01

    Full Text Available To test the applicability of item response theory (IRT to the Korean Nurses' Licensing Examination (KNLE, item analysis was performed after testing the unidimensionality and goodness-of-fit. The results were compared with those based on classical test theory. The results of the 330-item KNLE administered to 12,024 examinees in January 2004 were analyzed. Unidimensionality was tested using DETECT and the goodness-of-fit was tested using WINSTEPS for the Rasch model and Bilog-MG for the two-parameter logistic model. Item analysis and ability estimation were done using WINSTEPS. Using DETECT, Dmax ranged from 0.1 to 0.23 for each subject. The mean square value of the infit and outfit values of all items using WINSTEPS ranged from 0.1 to 1.5, except for one item in pediatric nursing, which scored 1.53. Of the 330 items, 218 (42.7% were misfit using the two-parameter logistic model of Bilog-MG. The correlation coefficients between the difficulty parameter using the Rasch model and the difficulty index from classical test theory ranged from 0.9039 to 0.9699. The correlation between the ability parameter using the Rasch model and the total score from classical test theory ranged from 0.9776 to 0.9984. Therefore, the results of the KNLE fit unidimensionality and goodness-of-fit for the Rasch model. The KNLE should be a good sample for analysis according to the IRT Rasch model, so further research using IRT is possible.

  17. OpenCV在车牌识别中的应用%Application of OpenCV in License Plate Recognition

    Institute of Scientific and Technical Information of China (English)

    姜莉莉; 蒋潇; 陈昕怡; 殷旭东

    2014-01-01

    For license plate recognition on smart phone, application of OpenCV is studied. First, OpenCV and work flow of license plate recognition are introduced. Then detailed application of OpenCV is discussed, which is in license plate location, character segmentation and character recognition. Experimental results show that the recognition is good. The foundation is laid for further developing a vehicle information management system on smart phones such as Android.%为利用智能手机进行车牌识别,研究了OpenCV在车牌识别中的应用。首先介绍了OpenCV及车牌识别的工作流程,然后论述了OpenCV在车牌定位、字符分割和字符识别中的具体应用。实验结果表明识别效果良好,为在Android等智能手机上进一步开发车辆信息管理系统奠定了基础。

  18. Coordination of engineering applications: Project summary

    Energy Technology Data Exchange (ETDEWEB)

    Cassidy, P.J.

    1996-08-31

    The purpose of this project was to focus on and coordinate several active engineering applications projects to optimize their integration. The end result of the project was to develop and demonstrate the capability of electronically receiving a part from the originating design agency, performing computer-aided engineering analyses, developing process plans, adding electronic input from numerous onsite systems, and producing an online operation sheet (manual) for viewing on a shop floor workstation. A successful demonstration of these applications was performed in December 1988.

  19. 图像处理在车牌识别技术中的应用%Application of image processing in license plate recognition technique

    Institute of Scientific and Technical Information of China (English)

    刘萌

    2014-01-01

    该课题论述了在车牌识别中运用到的各种数字图像处理技术,经过图像摄取、车牌图像预处理、VLP检测、字符分割、OCR、车牌识别几个过程构成了车牌牌照自动识别系统。图像处理在车牌识别技术中的应用方便了人们的生活。%This paper discusses all kinds of digital image processing technology to use in vehicle license plate recognition,image after ingestion,the license plate image preprocessing,VLP detection,character segmentation,OCR,license plate recognition process consists of automatic recognition system of vehicle license plate.Application of image processing in license plate recognition technique to facilitate people's life.

  20. 75 FR 70350 - Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application

    Science.gov (United States)

    2010-11-17

    ... Maritime Administration Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License... receive and transfer natural gas from purpose-build LNG regasification vessels (LNGRVs) with a total cargo tank capacity of approximately 145,000 m\\3\\. The vessels would be equipped to vaporize LNG cargo...

  1. 76 FR 4417 - Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application

    Science.gov (United States)

    2011-01-25

    ... Maritime Administration Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License.... Liberty Deepwater Port would receive and transfer natural gas from purpose-built LNG regasification... equipped to vaporize LNG cargo to natural gas through onboard closed loop vaporization systems and...

  2. 76 FR 1462 - Notice Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Science.gov (United States)

    2011-01-10

    ... analysis acceptance criteria continue to be met. Power level is not an initiator of any transient or... . Entergy Operations, Inc., System Energy Resources, Inc., South Mississippi Electric Power Association, and... licensed thermal power (CLTP) of 3,898 megawatts thermal (MWt) to 4,408 MWt. Evaluations and analyses...

  3. 政府数据开放许可适用研究%Research on the Application of Open Data License for the Government

    Institute of Scientific and Technical Information of China (English)

    迪莉娅

    2014-01-01

    The application of open data license plays an important role in promoting to open and use government data.The paper presents the types of open data licenses, analyzing the application conditions of foreign government open data license, and dis-cussing the important significances and strategies of establishing government open data license of China.%数据开放许可的应用对促进政府数据开放和利用具有重要的作用。文章阐述了开放数据许可的类型,分析了国外政府数据开放许可适用情况,并探讨了建立我国政府数据开放许可的重要性和策略。

  4. Scope management in web application projects

    Directory of Open Access Journals (Sweden)

    Cristina Coelho de Abreu Pinna

    2008-07-01

    Full Text Available Software projects are subjected to certain risks and uncertainties, especially those that include Web applications, due to the fact that market competition aims to have electronic and virtual services available in a shorter and shorter period of time (also known as “Internet timing”. Another critical factor relates to the focus to be adopted into the management of Web application projects – should technology or business process be emphasized? This fact produces some difficulties in the acceptance of the software by the customer. This problem could be minimized by appropriate management of the project scope from its earliest phases (conception and planning. The article will present an approach that can be utilized on the management of Web applications projects for the minimization of uncertainties and risks when defining scope. A comparative and critical analysis will be carried out among several instruments and techniques that can be utilized on the definition of scope and priorities such as: QFD, Business Process Modeling and Partitioning. Key-words: Project Management, Scope Management, Web applications, QFD.

  5. 47 CFR 27.13 - License period.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false License period. 27.13 Section 27.13... COMMUNICATIONS SERVICES Applications and Licenses § 27.13 License period. (a) 2305-2320 MHz and 2345-2360 MHz... beyond the end of the license term if no broadcast service had been provided, whichever period is...

  6. 27 CFR 555.42 - License fees.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false License fees. 555.42... EXPLOSIVES, DEPARTMENT OF JUSTICE EXPLOSIVES COMMERCE IN EXPLOSIVES Licenses and Permits § 555.42 License fees. (a) Each applicant shall pay a fee for obtaining a three year license, a separate fee...

  7. 47 CFR 24.15 - License period.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false License period. 24.15 Section 24.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PERSONAL COMMUNICATIONS SERVICES Applications and Licenses General Filing Requirements § 24.15 License period. Licenses for...

  8. 27 CFR 478.42 - License fees.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false License fees. 478.42... EXPLOSIVES, DEPARTMENT OF JUSTICE FIREARMS AND AMMUNITION COMMERCE IN FIREARMS AND AMMUNITION Licenses § 478.42 License fees. Each applicant shall pay a fee for obtaining a firearms license or...

  9. Motion Imagery and Robotics Application Project (MIRA)

    Science.gov (United States)

    Grubbs, Rodney P.

    2010-01-01

    This viewgraph presentation describes the Motion Imagery and Robotics Application (MIRA) Project. A detailed description of the MIRA camera service software architecture, encoder features, and on-board communications are presented. A description of a candidate camera under development is also shown.

  10. 75 FR 50760 - Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving...

    Science.gov (United States)

    2010-08-17

    ... of Project: Swan Lake North Hydroelectric Project. f. Location: Approximately 11 miles northeast of Klamath Falls in Klamath County, Oregon. The project would be a closed-loop pumped storage project...

  11. 37 CFR 5.11 - License for filing in a foreign country an application on an invention made in the United States...

    Science.gov (United States)

    2010-07-01

    ... foreign country an application on an invention made in the United States or for transmitting an... TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL SECRECY OF CERTAIN INVENTIONS AND LICENSES TO EXPORT AND... filing in a foreign country an application on an invention made in the United States or for transmitting...

  12. NRC Licensing Status Summary Report for NGNP

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kinsey, James Carl [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  13. 关联数据开放应用协议%The Open Application Licenses of Linked Data

    Institute of Scientific and Technical Information of China (English)

    张春景; 刘炜; 夏翠娟; 赵亮

    2012-01-01

    For the past few years Linked Data has been increasingly used in business, media, publication and governmental areas. In the process of publishing, consuming and re-creation of Linked Data, issues as to the ownership, the rights to use and publish, and who can benefit from Linked Data need to be appropriately addressed. Currently, the main agreements are Creative Commons family including CC BY-SA, CCO, CC BY, and CC BY-NC; the Open Data Commons family including Public Domain Dedication and License, Open Data License, Open Data Commons Attribution License and Open Government License and so on. Some suggestions on the application of Linked Data in China are put forward. 1 tab. 15 refs.%关联数据的应用正迅速发展并涉及到商业、媒体、出版、政府等领域。在关联数据发布、消费和再创造的过程中,必然涉及参与者的利益问题,需明确不同类型和归属的数据(或数据集)的所有权、发布权、使用权、收益权等。关联数据的发展迫切需要相关的许可协议。目前关联数据用到的协议主要有CC(知识共享)家族的CCBY-SA、CC0、CCBY、CCBY.NC和ODC(开放数据共用组织)的PDDL(公共领域奉献和许可),ODbL(开放数据许可)、ODC—By(开放数据共享署名许可),以及OGL(Open Government License,开放政府许可协议)等。对开放数据相关许可协议在国内的应用提出建议。表1。参考文献15。

  14. Occupational Licensing

    OpenAIRE

    Morris M. Kleiner

    2000-01-01

    The study of the regulation of occupations has a long and distinguished tradition in economics. In this paper, I present the central arguments and unresolved issues involving the costs and benefits of occupational licensing. The main benefits that are suggested for occupational licensing involve improving quality for those persons receiving the service. In contrast, the costs attributed to this labor market institution are that it restricts the supply of labor to the occupation and thereby dr...

  15. Project 2019 of Garona Nuclear power plant. First project to licensing renew more than 40 years in Spain; Proyecto 2019 de Cn Garona. El primer proyecto para la renovacion de licencia mas alla de 40 anos en Espana

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, R. A.; Torralbo, J. R.

    2004-07-01

    NUCLENOR has been developing lifetime management and modernisation activities at Santa Maria de Garona NPP since the end of the 80's and the plant is now in optimum technical conditions to continue in operation beyond its original lifetime planned in the design (40 years). In the USA, the country of origin of the project, a good number of power plants with a similar design, age and history to SMG are in the process of obtaining or have already obtained, a licensing extension of up to 60 years from the NRC. In Spain, the activities required for requesting a long-term operating licensing extension include the Ageing Assessment and Management of the plant systems, structures and components, in accordance with the american regulation 10CFR54, a Radiological Impact Study for the new operating period, and an Analysis of New Legislation, not included in the licensing bases and considered to be important to safety by the CSN. With a view to obtaining a renewal of the current operating permit for the period 2009-2019, NUCLENOR has launched the Proyecto 2019, which extends to technical and licensing aspects, as it involves all the company's personnel. (Author)

  16. Pesticide use and risk of end-stage renal disease among licensed pesticide applicators in the Agricultural Health Study

    Science.gov (United States)

    Lebov, Jill F.; Engel, Lawrence S.; Richardson, David; Hogan, Susan L.; Hoppin, Jane A.; Sandler, Dale P.

    2017-01-01

    Objectives Experimental studies suggest a relationship between pesticide exposure and renal impairment, but epidemiological evidence is limited. We evaluated the association between exposure to 41 specific pesticides and end-stage renal disease (ESRD) incidence in the Agricultural Health Study (AHS), a prospective cohort study of licensed pesticide applicators in Iowa and North Carolina. Methods Via linkage to the United States Renal Data System, we identified 320 ESRD cases diagnosed between enrollment (1993-1997) and December 2011 among 55,580 male licensed pesticide applicators. Participants provided pesticide use information via self-administered questionnaires. Lifetime pesticide use was defined as the product of duration and frequency of use and then modified by an intensity factor to account for differences in pesticide application practices. Cox proportional hazards models, adjusted for age and state, were used to estimate associations between ESRD and: 1) ordinal categories of intensity-weighted lifetime use of 41 pesticides, 2) poisoning and high-level pesticide exposures, and 3) pesticide exposure resulting in a medical visit or hospitalization. Results Positive exposure-response trends were observed for the herbicides alachlor, atrazine, metolachlor, paraquat, and pendimethalin, and the insecticide chlordane. More than one medical visit due to pesticide use (HR = 2.13; 95% CI: 1.17, 3.89) and hospitalization due to pesticide use (HR = 3.05; 95% CI: 1.67, 5.58) were significantly associated with ESRD. Conclusions Our findings support an association between ESRD and chronic exposure to specific pesticides and suggest pesticide exposures resulting in medical visits may increase the risk of ESRD. PMID:26177651

  17. 77 FR 11523 - Bryant Mountain, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-02-27

    ...: Bryant Mountain Pumped Storage Hydroelectric Project. f. Location: Near Malin in Klamath County, Oregon... Pumped Storage Hydroelectric Project) and the project number (P-13680-001), and bear the appropriate...

  18. 10 CFR 39.13 - Specific licenses for well logging.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Specific licenses for well logging. 39.13 Section 39.13 Energy NUCLEAR REGULATORY COMMISSION LICENSES AND RADIATION SAFETY REQUIREMENTS FOR WELL LOGGING Specific Licensing Requirements § 39.13 Specific licenses for well logging. The Commission will approve an application for a specific license for the...

  19. 18 CFR 4.107 - Contents of application for exemption from licensing.

    Science.gov (United States)

    2010-04-01

    ... project and any other existing or proposed project works and appurtenant facilities, including intake... or rehabilitation of existing generating units. (3) The type of each hydraulic turbine of the small.... Furnish justification for selection of installed capacity if the hydraulic capacity of proposed...

  20. 78 FR 37878 - Deepwater Port License Application: Liberty Natural Gas LLC, Port Ambrose Deepwater Port

    Science.gov (United States)

    2013-06-24

    ... offshore natural gas deepwater port facility that would be located approximately 17 nautical miles... regasification vessels (LNGRVs), vaporized on site and delivered through the STL Buoys, flexible riser/umbilical... Long Island--New York City Offshore Wind Collaborative wind energy project. This project will...

  1. List of Nuclear Materials Licensing Actions Received

    Data.gov (United States)

    Nuclear Regulatory Commission — A catalog of all Materials Licensing Actions received for review. The catalog lists the name of the entity submitting the license application, their city and state,...

  2. Issues in the review of a license application for an above grade low-level radioactive waste disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Ringenberg, J.D. [Nebraska Dept. of Environmental Quality, NE (United States)

    1993-03-01

    In December 1987, Nebraska was selected by the Central Interstate Compact (CIC) Commission as the host state for the construction of a low-level radioactive waste disposal facility. After spending a year in the site screening process, the Compact`s developer, US Ecology, selected three sites for detailed site characterization. These sites were located in Nemaha, Nuckolls and Boyd Counties. One year later the Boyd County site was selected as the preferred site and additional site characterization studies were undertaken. On July 29, 1990, US Ecology submitted a license application to the Nebraska Department of Environmental Control (now Department of Environmental Quality-NDEQ). This paper will present issues that the NDEQ has dealt with since Nebraska`s selection as the host state for the CIC facility.

  3. APPLICATION OF PROJECT MANAGEMENT APPROACHES AT A SMALL BUSINESSES ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Sergey V. Rajewski

    2016-01-01

    Full Text Available This article discusses the types of organizational structures of project management and their application in project management in small and medium-sized enterprises. Among the approaches and methods to organize projects emphasizing project management as part of the existing functional structure of the enterprise. Analyzed the most relevant organizational tools of project management in small business: a network schedule; matrix distribution of administrative and management tasks of the project; schedule of the project plan; information and technological methods and models used in the process of project management; software applications for project management, used in the sphere of small business.

  4. 75 FR 43958 - Hydrodynamics, Inc.; Notice of Application for Surrender of License and Soliciting Comments...

    Science.gov (United States)

    2010-07-27

    ... Sun River Project, in Teton County, Montana. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a... and Service of Responsive Documents--All filings must: (1) Bear in all capital letters the...

  5. Application of PLUTO Test Facility for U. S. NRC Licensing of a Fuel Assembly

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Dongseok; Shin, Changhwan; Lee, Kanghee; Kang, Heungseok [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    The fuel assembly of the PLUS-7 loaded in the APR-1400 follows the same schedule. Meanwhile, In July 1998, the U.S. NRC adopted a research plan to address the effects of high burnup from a Loss of Coolant Accident (LOCA). From these programs, several important technical findings for rule revision were obtained. Based on the technical findings, the U. S. NRC has amended the 10 CFR 50.46 which will be proclaimed sooner or later. Through the amendment, a LOCA analysis on the fuel assembly has to show the safety at both a fresh and End of Life (EOL) state. The U. S. NRC has already required EOL effects on seismic/LOCA performance for a fuel assembly since 1998. To obtain U.S NRC licensing of a fuel assembly, based on the amendment of 10CFR50.46, a LOCA analysis of the fuel assembly has to show safety both fresh and EOL states. The proper damping factor of the fuel assembly measured at the hydraulic test loop for a dynamic model in a LOCA and a seismic analysis code are at least required. In this paper, we have examined the damping technologies and compared the test facility of PLUTO with others in terms of performance. PLUTO has a better performance on the operating conditions than any others.

  6. 78 FR 79503 - Tennessee Valley Authority, Combined License Application for Bellefonte Units 3 and 4 Exemption...

    Science.gov (United States)

    2013-12-30

    ... (COL) application until further notice. On October 28, 2013, TVA requested an exemption from certain...) until requesting the NRC to resume its review of their COL application. The NRC staff reviewed this... report must be submitted prior to requesting the NRC resume its review of the COL application or...

  7. Advanced Turbine Technology Applications Project (ATTAP)

    Science.gov (United States)

    1993-01-01

    This report is the fifth in a series of Annual Technical Summary Reports for the Advanced Turbine Technology Applications Project (ATTAP), sponsored by the U.S. Department of Energy (DOE). The report was prepared by Garrett Auxiliary Power Division (GAPD), a unit of Allied-Signal Aerospace Company, a unit of Allied Signal, Inc. The report includes information provided by Garrett Ceramic Components, and the Norton Advanced Ceramics Company, (formerly Norton/TRW Ceramics), subcontractors to GAPD on the ATTAP. This report covers plans and progress on ceramics development for commercial automotive applications over the period 1 Jan. through 31 Dec. 1992. Project effort conducted under this contract is part of the DOE Gas Turbine Highway Vehicle System program. This program is directed to provide the U.S. automotive industry the high-risk, long-range technology necessary to produce gas turbine engines for automobiles with reduced fuel consumption, reduced environmental impact, and a decreased reliance on scarce materials and resources. The program is oriented toward developing the high-risk technology of ceramic structural component design and fabrication, such that industry can carry this technology forward to production in the 1990's. The ATTAP test bed engine, carried over from the previous AGT101 project, is being used for verification testing of the durability of next generation ceramic components, and their suitability for service at Reference Powertrain Design conditions. This document reports the technical effort conducted by GAPD and the ATTAP subcontractors during the fifth year of the project. Topics covered include ceramic processing definition and refinement, design improvements to the ATTAP test bed engine and test rigs, and the methodology development of ceramic impact and fracture mechanisms. Appendices include reports by ATTAP subcontractors in the development of silicon nitride materials and processes.

  8. Analysis Method for Licensing Application of Passive Autocatalytic Recombiner System as a Hydrogen Mitigation System of OPR-1000

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Changhyun; Sung, Jejoong; Ha, Sangjun [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of); Yeo, Inseon [KEPCO Engineering and Construction Co. Ltd., Yongin (Korea, Republic of)

    2014-05-15

    As a result, for some plants, dual hydrogen mitigation systems are prepared with a combination of PARs and igniters that each system has a 100% of full capacity for hydrogen control for postulated severe accident conditions. In the original design of OPR-1000, hydrogen mitigation systems consist of a thermal recombiner and twenty glow-type igniters, which are used for design basis accident and severe accident, respectively. This paper presents an analysis method for licensing application in Korea to determine the capacity and locations of PARs for the design of a hydrogen mitigation system with PAR. A licensed analysis method of OPR-1000 has been presented to determine the capacity and locations of PAR for the design of a hydrogen mitigation system with PAR. A lumped parameter code of MAAP 4.0.6+ has been adopted to simulate various severe accident scenarios with a 26 multi-compartment containment model. Hydrogen generations were analysed and required capacity and locations of PAR were determined for six accident scenarios selected from a combination of probabilistic and deterministic considerations. A total of twenty-four PARs in the containment dome, steam generator rooms, annulus and adjacent areas was designed and the adequacy of this system has been confirmed through detailed analyses including sensitivity analyses with/without operations of safety systems such as containment heat removal systems, reactor coolant depressurization system and safety injection by accumulator, etc. Through the assessment on the possibility of global FA and DDT, it has been concluded that new PAR system with twenty-four recombiners can remove hydrogen effectively in the containment atmosphere and prevent from global FA and DDT. Further works are required in the future to develop a well-balanced analysis methodology with a combination of lumped and CFD tools focusing on the optimum locations of recombiners and local hydrogen behaviour in containment compartments.

  9. License to Critique

    DEFF Research Database (Denmark)

    Christensen, Lars Thøger; Morsing, Mette; Thyssen, Ole

    2017-01-01

    on a research tradition that views communication as constitutive of organization to emphasize the significance of communicative mechanisms that stimulate organizational openness in the application of standards. With the notion of “license to critique,” we present a managerial philosophy designed to involve...

  10. 76 FR 6458 - Notice of Intent to File Competing License Applications, Filing of Pre-Application Documents...

    Science.gov (United States)

    2011-02-04

    .... FirstEnergy Generation Corporation....... P-2280-013 Seneca Nation of Indians P-13889-000 a. Type of...: Existing licensee--FirstEnergy Generation Corporation (FirstEnergy); and Competitor--Seneca Nation of Indians (Seneca Nation). e. Name of Project: Existing Project--Kinzua Pumped Storage Project;...

  11. A model record of technologies for use in a compatible projects for environmental licensing of wind farms; Um modelo de registro das tecnologias para uso na compatibilizacao de projetos para licenciamento ambiental de parques eolicos

    Energy Technology Data Exchange (ETDEWEB)

    Tavares Junior, Wandemberg; Oliveira, Lucia Maria Barbosa [Universidade de Fortaleza (UNIFOR), CE (Brazil)

    2008-07-01

    This article presents the development of a model for survey and registration of technologies that can be inserted in the process of reconciliation of the subjects of the project for environmental licensing of wind farms. It was used a basis for the theoretical model of the Simultaneous Engineering and Failure Mode and Effect Analysis - FMEA. Given the importance that the wind has for the pursuit of sustainable development, this work had as its main objective to contribute to the reduction of negative indices, proposing improvements to the process of project for environmental licensing of wind farms. (author)

  12. 77 FR 12830 - Pershing County Water Conservation District; Notice of Intent To File License Application, Filing...

    Science.gov (United States)

    2012-03-02

    ... Pershing County, Nevada. The project occupies 0.01 acre of United States lands administered by the Bureau... Energy Regulatory Commission Pershing County Water Conservation District; Notice of Intent To File....: 14327-000. c. Date Filed: November 22, 2011. d. Submitted by: Pershing County Water...

  13. 75 FR 17402 - South Carolina Public Service Authority; Notice of Applications for Amendment of License and...

    Science.gov (United States)

    2010-04-06

    ... following five changes in project land classification: Thornley Subdivision in Berkeley County (-218... commercial lease area; Dingle Pond Area in Berkeley County (-221), 3.4 acres from ``Forest Management'' to ``USFWS'' to correct a ] classification error; and Cross Area in Berkeley County (-222), approximately...

  14. Software licenses: Stay honest!

    CERN Document Server

    Computer Security Team

    2012-01-01

    Do you recall our article about copyright violation in the last issue of the CERN Bulletin, “Music, videos and the risk for CERN”? Now let’s be more precise. “Violating copyright” not only means the illegal download of music and videos, it also applies to software packages and applications.   Users must respect proprietary rights in compliance with the CERN Computing Rules (OC5). Not having legitimately obtained a program or the required licenses to run that software is not a minor offense. It violates CERN rules and puts the Organization at risk! Vendors deserve credit and compensation. Therefore, make sure that you have the right to use their software. In other words, you have bought the software via legitimate channels and use a valid and honestly obtained license. This also applies to “Shareware” and software under open licenses, which might also come with a cost. Usually, only “Freeware” is complete...

  15. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Science.gov (United States)

    2010-04-01

    ... transmission lines are works of a hydropower project and are required to be licensed. (q) Reject an application...'s jurisdiction over a hydropower project under the Federal Power Act; (6) New or revised exhibits... response to a term or condition in a preliminary permit, license, or exemption issued for a hydropower...

  16. 10 CFR 35.18 - License issuance.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false License issuance. 35.18 Section 35.18 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL General Information § 35.18 License issuance. (a) The Commission shall issue a license for the medical use of byproduct material if— (1) The applicant has...

  17. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Eugene S. Grecheck

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  18. Project Surveillance and Maintenance Plan. [UMTRA Project

    Energy Technology Data Exchange (ETDEWEB)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

  19. 78 FR 17450 - Notice of Issuance of Materials License Renewal, Operating License SUA-1341, Uranium One USA, Inc...

    Science.gov (United States)

    2013-03-21

    ... COMMISSION Notice of Issuance of Materials License Renewal, Operating License SUA-1341, Uranium One USA, Inc., Willow Creek Uranium In Situ Recovery Project AGENCY: Nuclear Regulatory Commission. ACTION: Notice of... license renewal for Materials License No. SUA- 1341 to Uranium One USA, Inc. (Uranium One) for its...

  20. Viability Assessment of a Repository at Yucca Mountain. Volume 4: License Application Plan and Costs

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

  1. 77 FR 48512 - Northern Indiana Public Service Company; Notice of Application for Amendment of License and...

    Science.gov (United States)

    2012-08-14

    ... 0.25 feet of elevation 612.45 NGVD. The U.S. Fish and Wildlife Service and the Indiana Department of...: A copy of the application is available for inspection and reproduction at the Commission's Public... available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to...

  2. 77 FR 8288 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Science.gov (United States)

    2012-02-14

    ... value shall be added to the cycle-specific SLMCPR value. This adder is applicable to SLO , which is.... The proposed change to the MCPR SLs accounts for the 0.02 adder specified in the NRC Safety Evaluation... revision to the MCPR SLs accounts for the 0.02 adder specified in the NRC Safety Evaluation limitations...

  3. 75 FR 4111 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-01-26

    ... resistance to tube pullout due to the pressure induced forces, with applicable safety factors applied... revises testing acceptance criteria for the existing Indian Point 2 Control Room filtration system in... criteria for the existing Control Room filtration system. The proposed change does not involve...

  4. 75 FR 57521 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-09-21

    ... applicable acceptance criteria. The safety analyses for these accidents have been performed at the EPU power... is consistent with the safety analysis assumptions. The proposed RPS and ESFAS Limiting Safety System... (CST),'' resulting from (1) modifications to the AFW system to support requirements for transients...

  5. 76 FR 56483 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Science.gov (United States)

    2011-09-13

    ... MWt. Nuclear steam supply system and balance-of-plant systems, components and analyses that could be... applicable analysis acceptance criteria are still met with the proposed changes. Power level is an input assumption to equipment design and accident analyses, but it is not a transient or accident...

  6. 75 FR 52039 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-08-24

    ... application for amendment which is available for public inspection at the Commission's PDR, located at One..., ``Both Isolation Actuation Instrument Channels Inoperable'' (Agencywide Documents Access and Management... restricts the maximum fuel rod average burnup. Deletion of this condition would allow the maximum fuel...

  7. 75 FR 32509 - Notice Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Science.gov (United States)

    2010-06-08

    ... amendment action, see the application for amendment which is available for public inspection at the... and channel surveillance requirements associated with average power range monitor simulated thermal... the RPV head is removed, any gaseous release due to fuel damage from any accident or transient...

  8. 75 FR 76000 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-12-07

    ..., access channel, and landscaping. Existing facilities that would be re-built in place at their current dimensions include a floating fuel dock and two floating courtesy docks. Proposed new facilities include a... of the application is available for inspection and reproduction at the Commission's Public...

  9. Application of Fuzzy theory to project scheduling with critical path ...

    African Journals Online (AJOL)

    Application of Fuzzy theory to project scheduling with critical path method. ... Journal of Applied Sciences and Environmental Management. Journal Home · ABOUT ... In this paper, we analyze the project scheduling problem using fuzzy theory.

  10. 30 CFR 402.11 - Technology-development project applications.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Technology-development project applications... RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.11 Technology-development project applications. (a) Grant awards will be used...

  11. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Science.gov (United States)

    2010-07-01

    ... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles...

  12. APPLICATION OF PROJECT MANAGEMENT APPROACHES AT A SMALL BUSINESSES ENTERPRISES

    OpenAIRE

    Sergey V. Rajewski

    2016-01-01

    This article discusses the types of organizational structures of project management and their application in project management in small and medium-sized enterprises. Among the approaches and methods to organize projects emphasizing project management as part of the existing functional structure of the enterprise. Analyzed the most relevant organizational tools of project management in small business: a network schedule; matrix distribution of administrative and management tasks of the projec...

  13. Calculation and application of liquidus projection

    Institute of Scientific and Technical Information of China (English)

    CHEN Shuanglin; CAO Weisheng; YANG Ying; ZHANG Fan; WU Kaisheng; DU Yong; Y.Austin Chang

    2006-01-01

    Liquidus projection usually refers to a two-dimensional projection of ternary liquidus univariant lines at constant pressure. The algorithms used in Pandat for the calculation of liquidus projection with isothermal lines and invariant reaction equations in a ternary system are presented. These algorithms have been extended to multicomponent liquidus projections and have also been implemented in Pandat. Some examples on ternary and quaternary liquidus projections are presented.

  14. Graphitic Carbon Foam Structural Cores and Multifunctional Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Project will procure available graphite foam products in small quantities, perform testing, and build simple prototype designs. Several specific applications have...

  15. 78 FR 51753 - AUC, LLC Reno Creek, In Situ Project, New Source Material License Application

    Science.gov (United States)

    2013-08-21

    ... cultural resources. The NRC staff will coordinate compliance with the Section 106 of the National Historic... regarding the proposed action as well as information about other resources, such as historic and cultural... modes, routes, quantities, and risk estimates; Geology and Soils: Physical geography, topography...

  16. 76 FR 71082 - Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application...

    Science.gov (United States)

    2011-11-16

    ... modes, routes, quantities, and risk estimates; Geology and Soils: Physical geography, topography... sensitive receptors; Historical and Cultural Resources: Historical, archaeological, and traditional cultural...

  17. Projection Theory and Its Application into Media Discourse Analysis

    Institute of Scientific and Technical Information of China (English)

    邵宏

    2008-01-01

    Projection is a kind of logical-semantic relation which refers to the phenomenon that the secondary clause is projected through the primary clause, which instates it as a locution or an idea. Halliday conducts the basic research on projection from the functional perspective. Then Martin and Zeng try to develop Halliday's projection theory, resulting in a comprehensive framework of projection. Finally the projection theory is applied into the analysis of a sample media discourse. And projection theory is of great help in its application into media discourse analysis.

  18. 33 CFR Appendix A to Part 221 - Part 16-Procedures Relating to Takeover and Relicensing of Licensed Projects

    Science.gov (United States)

    2010-07-01

    ... 15 of part I of the Federal Power Act, as amended, enacted by Public Law 90-451, 82 Stat. 616... Federal Power Act. This statement shall include estimates of: (1) Fair value; (2) net investment; and (3) severance damages. (This subsection is not applicable to State, municipal, or nonlicensee applicants.)...

  19. 10 CFR 51.54 - Environmental report-manufacturing license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-manufacturing license. 51.54 Section... report—manufacturing license. (a) Each applicant for a manufacturing license under subpart F of part 52... Environmental Report—Manufacturing License.” The environmental report must address the costs and benefits...

  20. 10 CFR 52.109 - Continuation of combined license.

    Science.gov (United States)

    2010-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.109 Continuation of combined license. Each combined license for a... continue to maintain the facility, including, where applicable, the storage, control and maintenance of...

  1. 78 FR 79018 - Request for a License To Export Deuterium

    Science.gov (United States)

    2013-12-27

    ... COMMISSION Request for a License To Export Deuterium Pursuant to 10 CFR 110.70 (b) ``Public Notice of Receipt... received the following request for an export license. Copies of the request are available electronically.... The information concerning this export license application follows. ] NRC Export License...

  2. 10 CFR 52.167 - Issuance of manufacturing license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Issuance of manufacturing license. 52.167 Section 52.167... POWER PLANTS Manufacturing Licenses § 52.167 Issuance of manufacturing license. (a) After completing any... manufacturing license if the Commission finds that: (1) Applicable standards and requirements of the Act and the...

  3. Considerations about the licensing process of special nuclear industrial facilities

    Energy Technology Data Exchange (ETDEWEB)

    Talarico, M.A., E-mail: talaricomarco@hotmail.com [Marinha do Brasil, Rio de Janeiro, RJ (Brazil). Coordenacao do Porgrama de Submarino com Propulsao Nuclear; Melo, P.F. Frutuoso e [Coordenacao dos Programas de Pos-Graduacao em Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Nuclear

    2015-07-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  4. 基于数学形态学和投影法的车牌定位方法%Vehicle License Plate Location Based on Mathematical Morphology and Projection

    Institute of Scientific and Technical Information of China (English)

    马永慧; 薛丹丹

    2013-01-01

    在车牌定位系统中,针对图像中存在的复杂背景、车辆自身的车灯或标志这些因素的影响,提出了车牌初步定位和精确定位的方法.首先,对车牌图像进行灰度化、灰度拉伸、边缘检测后,运用数学形态学运算和车牌自身的宽高比例初步定位出车牌区域.然后,运用投影法分别进行水平方向和垂直方向的定位,得到准确的车牌区域.该方法能够很好地排除干扰因素,精确定位出车牌.%In the license plate localization system, according to the impact of these factors that the image of complex background, vehicle own lamp or mark, an algorithm about preliminary positioning and precise positioning of vehicle license plate is presented. First of all, after gray level transformation, gray stretching and edge detection of the license plate image, it can use morphological operation and the proportion of the width and height of the license plate to position the license plate area preliminarily. Then, it uses the projection method to determine horizontal edge and vertical edge based on preliminarily positioning image to get the exact license plate area. The method can remove interference factors effectively, so as to achieve the purpose of precise license plate location.

  5. 78 FR 44105 - Monroe Hydro, LLC; Notice of Intent to File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2013-07-23

    ... Commission's regulations h. Potential Applicant Contact: Gia Schneider, Natel Energy, 2175 Monarch Street, Alameda, CA 94501; (510) 342-5269; email -gia@natelenergy.com . i. FERC Contact: Adam Beeco at (202)...

  6. Practical automatic Arabic license plate recognition system

    Science.gov (United States)

    Mohammad, Khader; Agaian, Sos; Saleh, Hani

    2011-02-01

    Since 1970's, the need of an automatic license plate recognition system, sometimes referred as Automatic License Plate Recognition system, has been increasing. A license plate recognition system is an automatic system that is able to recognize a license plate number, extracted from image sensors. In specific, Automatic License Plate Recognition systems are being used in conjunction with various transportation systems in application areas such as law enforcement (e.g. speed limit enforcement) and commercial usages such as parking enforcement and automatic toll payment private and public entrances, border control, theft and vandalism control. Vehicle license plate recognition has been intensively studied in many countries. Due to the different types of license plates being used, the requirement of an automatic license plate recognition system is different for each country. [License plate detection using cluster run length smoothing algorithm ].Generally, an automatic license plate localization and recognition system is made up of three modules; license plate localization, character segmentation and optical character recognition modules. This paper presents an Arabic license plate recognition system that is insensitive to character size, font, shape and orientation with extremely high accuracy rate. The proposed system is based on a combination of enhancement, license plate localization, morphological processing, and feature vector extraction using the Haar transform. The performance of the system is fast due to classification of alphabet and numerals based on the license plate organization. Experimental results for license plates of two different Arab countries show an average of 99 % successful license plate localization and recognition in a total of more than 20 different images captured from a complex outdoor environment. The results run times takes less time compared to conventional and many states of art methods.

  7. Development of licensing process for SMART-P

    Energy Technology Data Exchange (ETDEWEB)

    Jo, Jong Chull; Yune, Young Gill; Kim, Woong Sik (and others)

    2004-06-15

    The basic design of System-integrated Modular Advanced Reactor (SMART), a small-to-medium sized integral type pressurized water reactor (PWR) with the capacity of 330MWth, has been developed in Korea. Presently, for the purpose of demonstrating the safety and performance of the SMART design, 'Development Project of SMART-P (SMART-Pilot Plant)' is being performed as one of the 'National Mid and Long-term Atomic Energy R and D Programs', which includes design, construction, and start-up operation of the SMART-P with the capacity of 65MWth, a 1/5 scaled-down design of the SMART. At the same time, a study on the establishment of a licensing process for the SMART-P has been carried out by KINS in order to prepare for the forthcoming SMART-P licensing. The results of this study performed from Aug. of 2002 to June of 2004 can be summarized as follows: (1) The construction purpose and design characteristics of the SMRAT-P were reviewed. (2) The licensing processes for reactors in Korea, U.S.A., Japan, France, U.K., Canada, and IAEA were analyzed. (3) Reactor classification criteria were established based on the analysis results for the foreign licensing processes. And a development direction for the licensing process applicable to the development reactor was established. (4) 4 candidate models of licensing process for the development reactor were proposed based on the domestic licensing processes considering the general trends and practices of the foreign licensing processes. Evaluation of the candidate models were performed. (5) Through the expert review of the candidate models, an optimized model was finally selected and an implementation plan for the optimized model including legalization was established. The licensing process for the development reactor proposed in this study can be applied directly to the licensing of the SMART-P. Furthermore, it will be also applied to the licensing of the development reactors for the advanced reactors such as the

  8. Nanostructures for Electronic and Sensing Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed project will develop sensors and electronic components from metal oxide based nanotubes and nanowires. These nanostructured materials will be grown...

  9. Licensed Healthcare Facilities

    Data.gov (United States)

    California Department of Resources — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  10. 2015 Business Licenses

    Data.gov (United States)

    City of Jackson, Mississippi — This data displays all business license information for the year of 2015. This information details license classifications and status. This information will updated...

  11. Licensed Healthcare Facilities

    Data.gov (United States)

    California Department of Resources — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  12. 78 FR 5505 - Turkey Point, Units 3 and 4; Application and Amendment to Facility Operating License Involving...

    Science.gov (United States)

    2013-01-25

    ... and Management System (ADAMS): You may access publicly available documents online in the NRC Library...: License amendment request; opportunity to comment, request a hearing and petition for leave to intervene... pH control system consisting of ten stainless steel baskets loaded with NaTB but do not...

  13. 78 FR 5508 - Vogtle Electric Generating Plant, Units 3 and 4; Application and Amendment to Combined Licenses...

    Science.gov (United States)

    2013-01-25

    ... requirements for shear reinforcement spacing in the AP1000 basemat does not impact the support, design, or...) to clarify the requirements for shear reinforcement spacing in the nuclear island basemat below the... reinforcement in the basemat below the auxiliary building. Before issuance of the proposed license...

  14. Licensing failure in the European decentralised procedure

    NARCIS (Netherlands)

    Langedijk, Joris; Ebbers, Hans C; Mantel-Teeuwisse, Aukje K; Kruger-Peters, Alexandra G; Leufkens, Hubert G M

    2016-01-01

    The majority of the licensing applications in the European Union are submitted via the decentralised procedure. Little is known about licensing failure (i.e. refusal or withdrawal of a marketing authorisation application) in the EU decentralised procedure compared to the EU centralised procedure and

  15. Application of Important Factors in Tunnel Projects

    Directory of Open Access Journals (Sweden)

    Siamak Bagherian

    2013-06-01

    Full Text Available The objective of this thesis is to improve the quality of the basis for making decisions about tender prices and budgets for tunnel projects by developing a model for the estimation of construction time and cost. The planning and constructing of extensions to existing road and railway networks is an ongoing mission of transport infrastructure development. For functional, aesthetic or environmental reasons, a large number of these extensions are planned as tunnels. In the planning and procurement phases of tunnel projects, numerous decisions have to be made in relation to the tender price and project budget.

  16. System recognizing Bahamian license plate with touching characters

    Science.gov (United States)

    Dun, Jingyu; Zhang, Sanyuan; Ye, Xiuzi; Zhang, Yin

    2016-11-01

    Various methods are proposed for license plate recognition, but none of them are universal. Some common methods for license plate localization, character extraction, and recognition are analyzed. Then a system is proposed to recognize the Bahamian license plate with touching characters. A vertical edge-based method with a modified sliding window technique is used to locate the license plate, and a machine learning process is used to trim the region. The located license plate is rectified by using the minimum enclosing box and the stroke width value. Then the vertical projection and pairs of extreme points are combined to segment the characters. Finally, a deep learning method is used to recognize the characters. 2996 images are experimented on and the total recognition accuracy achieves 83.29%. Typical methods of each stage are implemented to compare with the proposed methods. In addition, the proposed system is experimented on a public dataset to show the generalization ability of the system. The experimental results show that the proposed system performs better than the other methods and is able to be used in a real-time application.

  17. Texas site selection and licensing status

    Energy Technology Data Exchange (ETDEWEB)

    Avant, R.V. Jr.

    1989-11-01

    Texas has identified a potential site in Hudspeth County in far West Texas near the town of Fort Hancock. Over the past year the Texas Low-Level Radioactive Waste Disposal Authority has been conducting detailed geology, hydrology, meteorology, soils, and flora and fauna evaluations. An authorization by the Board of Directors of the Authority to proceed with a license application, assuming that the detailed evaluation indicates that the site is suitable, is expected by September. A prototype license has been prepared in anticipation of the order to proceed with licensing, and the formal license application is expected to be submitted to the Texas Department of Health-Bureau of Radiation Control in December, meeting the license application milestone. Although site selection processes in all siting areas across the country have experienced organized opposition, El Paso County has funded a particularly well-organized, well-financed program to legally and technically stop consideration of the Fort Hancock site prior to the licensing process. Many procedural, regulatory, and technical issues have been raised which have required responses from the Authority in order to proceed with licensing. This has provided a unique perspective of what to expect from well-organized opposition at the licensing stage. This paper presents an update on the Texas siting activity with detailed information on the site evaluation and license application. Experience of dealing with issues raised by opposition relating to NRC guidelines and rules is also discussed.

  18. Selecting Map Projections in Minimizing Area Distortions in GIS Applications.

    Science.gov (United States)

    Yildirim, Faruk; Kaya, Ahmet

    2008-12-03

    Varioussoftware for Geographical Information Systems (GISs) have been developed and used in many different engineering projects. In GIS applications, map coverage is important in terms of performing reliable and meaningful queries. Map projections can be conformal, equal-area and equidistant. The goal of an application plays an important role in choosing one of those projections. Choosing the equal-area projection for an application in which area information is used (forestry, agriculture, ecosystem etc) reduces the amount of distortion on the area, but many users using GIS ignore this fact and continue to use applications with present map sheets no matter in what map projection it is. For example, extracting area information from data whose country system's map sheet is in conformal projection is relatively more distorted, compared to an equal-area projection one. The goal of this study is to make the best decision in choosing the most proper equal-area projection among the choices provided by ArcGIS 9.0, which is a popular GIS software package, and making a comparison on area errors when conformal projection is used. In this study, the area of parcels chosen in three different regions and geographic coordinates and whose sizes vary between 0.01 to 1,000,000 ha are calculated according to Transversal Mercator (TM, 3°), Universal Transversal Mercator (UTM, 6°) and 14 different equal-area projections existing in the ArcGIS 9.0 GIS software package. The parcel areas calculated with geographical coordinates are accepted as definite. The difference between the sizes calculated according to projection coordinates and real sizes of the parcels are determined. Consequently, the appropriate projections are decided for the areas smaller and equal than 1,000 ha and greater than 1,000 ha in the GIS software package.

  19. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  20. Nanotube MMC for Structural Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Aluminum based metal matrix composites are particularly attractive in aviation and aerospace applications because of their exceptional strength and...

  1. 75 FR 7469 - Panel Member List for Hydropower Licensing Study Dispute Resolution; Notice Extending Filing Date...

    Science.gov (United States)

    2010-02-19

    ... Energy Regulatory Commission Panel Member List for Hydropower Licensing Study Dispute Resolution; Notice Extending Filing Date for Applications for Panel Member List for Hydropower Licensing Study Dispute... in the Commission's hydropower integrated licensing process (ILP) study dispute resolution process...

  2. Is Agile Project Management Applicable to Construction?

    OpenAIRE

    Owen, R.; Koskela, LJ; Henrich, G; Codinhoto, R

    2006-01-01

    This paper briefly summarises the evolution of Agile Project Management (APM) and differentiates it from lean and agile production and ‘leagile’ construction. The significant benefits being realized through employment of APM within the information systems industry are stated. The characteristics of APM are explored, including: philosophy, organizational attitudes and practices, planning, execution and control and learning. Finally, APM is subjectively assessed as to its potential contribution...

  3. Longwave Imaging for Astronomical Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to develop a compact portable longwave camera for astronomical applications. In Phase 1, we successfully developed the eye of the camera, i.e. the focal...

  4. Shielded ADR Magnets For Space Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — An important consideration of the use of superconducting magnets in ADR applications is shielding of the other instruments in the vicinity of the superconducting...

  5. Composite Matrix Systems for Cryogenic Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — As an alternative material to aluminum-lithium, cryotanks developed from fiber reinforced composites can offer significant weight savings in applications for fuel...

  6. Shielded ADR Magnets For Space Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Phase II program will concentrate on manufacturing of qualified low-current, light-weight, 10K ADR magnets for space application. Shielded ADR solenoidal magnets...

  7. Mobile Application Development: Component Retrieval System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed technology development concept is a software application tool developed for use on a mobile device at SSC for use in the component retrieval system...

  8. Longwave Imaging for Astronomical Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to develop a compact portable longwave camera for astronomical applications. In Phase 1, we will develop and deliver the focal plane array (FPA) - a...

  9. Novel Lightweight Magnets for Space Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — TYRC of Tallahassee, Florida will design, fabricate and test a novel magnet for space applications. This lightweight magnet will be designed to operate at higher...

  10. Minimal Technologies Application Project: Planning and installation

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.; Hinchman, R.R.; Severinghaus, W.D.; Johnson, D.O.; Brent, J.J.

    1989-03-01

    Intensive and continuous tactical training during the last 35 years at the Hohenfels Training Area in West Germany has caused the loss of vegetative ground cover and has accelerated soil erosion rates, resulting in extensive environmental damage, safety hazards, and unrealistic training habitats. The objectives of this project are to develop and evaluate revegetation procedures for establishing adequate vegetative cover to control erosion at minimal costs and disruption to training activities. This project involved the development and installation of 12 revegetation procedures that combined four seedbed preparation methods and seeding options with three site-closure periods. In March 1987, the four seedbed preparation/seeding options and closure periods were selected, a study site design and location chosen, and specifications for the revegetation procedures developed. A German rehabilitation contractor attempted the specified seedbed preparation and seeding on the 13.5-ha site in June, but abnormally high rainfall, usually wet site conditions, and lack of adequate equipment prevented the contractor from completing six of the 12 planned procedures. Planning and execution of the project has nonetheless provided valuable information on the importance and use of soil analytical results, seed availability and cost data, contractor equipment requirements, and time required for planning future revegetation efforts. Continued monitoring of vegetative ground cover at the site for the next two years, combined with cost information, will provide necessary data to determine which of the six revegetation procedures is the most effective. These data will be used in planning future rehabilitation efforts on tactical training areas.

  11. On Helical Projection and Its Application in Screw Modeling

    Directory of Open Access Journals (Sweden)

    Riliang Liu

    2014-04-01

    Full Text Available As helical surfaces, in their many and varied forms, are finding more and more applications in engineering, new approaches to their efficient design and manufacture are desired. To that end, the helical projection method that uses curvilinear projection lines to map a space object to a plane is examined in this paper, focusing on its mathematical model and characteristics in terms of graphical representation of helical objects. A number of interesting projective properties are identified in regard to straight lines, curves, and planes, and then the method is further investigated with respect to screws. The result shows that the helical projection of a cylindrical screw turns out to be a Jordan curve, which is determined by the screw's axial profile and number of flights. Based on the projection theory, a practical approach to the modeling of screws and helical surfaces is proposed and illustrated with examples, and its possible application in screw manufacturing is discussed.

  12. Compulsory licensing of patents in India.

    Science.gov (United States)

    Chaudhry, Rahul

    2016-09-01

    This article deals with compulsory licensing scenarios in India, provides a background of relevant provisions in the Patents Act and examines how these provisions are Trade-Related Aspects of Intellectual Property Rights compliant. This article further discusses the procedure followed by India in granting a compulsory license, provides an overview of compulsory license applications filed in India to date and judicial precedence regarding the same. This article also highlights how compulsory licensing is a great safeguard that balances the interests of the innovators and the public at large.

  13. Exploring the application of interactive video projection in Physical Education

    NARCIS (Netherlands)

    S.I. (Sanne) de Vries; Danica Mast; Jeroen de Krom

    2015-01-01

    This paper describes explorations into related technology and research regarding the application of interactive video projection within physical education and the gym of the future. We discuss the application of exergaming in physical education, spatial augmented reality as a technology and

  14. 76 FR 32866 - Cable Landing Licenses; Correction

    Science.gov (United States)

    2011-06-07

    ... Systems Agency in the regulations that we published in the Federal Register of January 14, 2002, 67 FR... COMMISSION 47 CFR Part 1 Cable Landing Licenses; Correction AGENCY: Federal Communications Commission. ACTION... streamlined processing of cable landing license applications. Need for Correction As published, the...

  15. 77 FR 10727 - Applications for New Awards; Fulbright-Hays Group Projects Abroad Program-Short-Term Projects and...

    Science.gov (United States)

    2012-02-23

    ... Fulbright-Hays Group Projects Abroad (GPA) Program supports overseas projects in training, research, and... grant application for the Fulbright- Hays GPA Programs at http://Grants.gov. You must search for the... Applications for New Awards; Fulbright-Hays Group Projects Abroad Program--Short-Term Projects and...

  16. Application of a new operating license for the Finnish FiR 1 reactor and the change of generation of the reactor personnel

    Energy Technology Data Exchange (ETDEWEB)

    Salmenhaara, Seppo; Auterinen, Iiro [VTT Technical Research Centre of Finland, Otaniemi, Espoo (Finland)

    2008-10-29

    The FiR 1 epithermal BNCT facility is a TRIGA Mark II reactor: 250 kW; 15 kg U containing 3 kg {sup 235}U (20% enrichment) in the special TRIGA uranium-zirconium hydride fuel (8-12 w% U, 91% Zr, 1% H); epithermal neutrons are created by the FLUENTAL{sup TM} neutron moderator; Neutron collimation: Bi + Li-Poly cone; epithermal neutron flux: 1.1 10{sup 9} /cm{sup 2}s; fast neutron dose: 2 Gy/10{sup 13} cm{sup -2}. The schedule of the Operating License Application is as follows: - 2009 decision to apply a new license; - 2010 preparation of the documents needed for the application; - 2011 the documents will be checked by the authorities and at the end of the year the new license should be granted by the Government; - 2012-2016 probable period of the new license The supplementary documents to the application for an operating license are: 1. Details of the site; 2. The quality and maximum amounts of the nuclear material 3. An outline of the technical operating principles and arrangements whereby the safety has been ensured; 4. A description of the safety principles that have been observed, and an evaluation of the fulfillment of the principles; 5. A description of the measures to restrict the burden caused by the nuclear facility on the environment; 6. The expertise available to the applicant and the operating organization; 7. Plans for arranging nuclear waste management. The applicant submits to the Radiation and Nuclear Safety Authority: 1. The final safety analysis report; 2. A probabilistic safety analysis; 3. A quality assurance programme for the operation of the nuclear facility; 4. Technical specifications; 5. A summary programme for periodic inspections; 6. A description of the arrangements for physical protection and emergencies; 7. A description on how to arrange the safeguards that are necessary to prevent the proliferation of nuclear weapons; 8. Administrative rules; 9. A programme for radiation monitoring in the environment. Reactor key persons and the

  17. 77 FR 16216 - Lock+ Hydro Friends Fund XLVI, LLC; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2012-03-20

    ... Friends Fund XLVI, LLC. e. Name of Project: Hildebrand Lock and Dam Hydroelectric Project. f. Location: At the existing Hildebrand Lock and Dam on the Monongahela River, in Monongalia County, West...

  18. 77 FR 18801 - Notice of Application for Non-Capacity Amendment of License and Soliciting Comments, Motions To...

    Science.gov (United States)

    2012-03-28

    .... Name of Project: Niagara Power Project. f. Location: On the Niagara River, in the City of Niagara Falls and the Towns of Niagara and Lewiston in Niagara County, New York. g. Filed Pursuant to: Federal...

  19. An Application of the Real Options Method to the Valuation of a License to Operate 3G Mobile Phone Service in Brazil.

    Directory of Open Access Journals (Sweden)

    Rafael Stille

    2010-10-01

    Full Text Available We analyze the contributions of the real option method to the decision making process in the telecommunications industry. We study the case of a public auction purchase of the license to operate a 3G mobile phone system in Brazil. The results indicate that the embedded flexibilities increase the value of the project by 64% in relative to the discounted cash flow method, which could justify the high premiums paid by the winning firms, which are incompatible with the value obtained from traditional methods of analysis. This suggests that the real options approach used, which can be easily replicated and is fairly intuitive, can be a useful tool to support the decision making process of these firms.

  20. Natural analog studies: Licensing perspective

    Energy Technology Data Exchange (ETDEWEB)

    Bradbury, J.W. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-09-01

    This report describes the licensing perspective of the term {open_quotes}natural analog studies{close_quotes} as used in CFR Part 60. It describes the misunderstandings related to its definition which has become evident during discussions at the U.S Nuclear Regulatory Commission meetings and tries to clarify the appropriate applications of natural analog studies to aspects of repository site characterization.

  1. Projecting LED product life based on application

    Science.gov (United States)

    Narendran, Nadarajah; Liu, Yi-wei; Mou, Xi; Thotagamuwa, Dinusha R.; Eshwarage, Oshadhi V. Madihe

    2016-09-01

    LED products have started to displace traditional light sources in many lighting applications. One of the commonly claimed benefits for LED lighting products is their long useful lifetime in applications. Today there are many replacement lamp products using LEDs in the marketplace. Typically, lifetime claims of these replacement lamps are in the 25,000-hour range. According to current industry practice, the time for the LED light output to reach the 70% value is estimated according to IESNA LM-80 and TM-21 procedures and the resulting value is reported as the whole system life. LED products generally experience different thermal environments and switching (on-off cycling) patterns when used in applications. Current industry test methods often do not produce accurate lifetime estimates for LED systems because only one component of the system, namely the LED, is tested under a continuous-on burning condition without switching on and off, and because they estimate for only one failure type, lumen depreciation. The objective of the study presented in this manuscript was to develop a test method that could help predict LED system life in any application by testing the whole LED system, including on-off power cycling with sufficient dwell time, and considering both failure types, catastrophic and parametric. The study results showed for the LED A-lamps tested in this study, both failure types, catastrophic and parametric, exist. The on-off cycling encourages catastrophic failure, and maximum operating temperature influences the lumen depreciation rate and parametric failure time. It was also clear that LED system life is negatively affected by on-off switching, contrary to commonly held belief. In addition, the study results showed that most of the LED systems failed catastrophically much ahead of the LED light output reaching the 70% value. This emphasizes the fact that life testing of LED systems must consider catastrophic failure in addition to lumen depreciation, and

  2. Licensing process for safety-critical software-based systems

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, P. [VTT Automation, Espoo (Finland); Korhonen, J. [VTT Electronics, Espoo (Finland); Pulkkinen, U. [VTT Automation, Espoo (Finland)

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications

  3. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  4. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  5. Towards sentiment analysis application in housing projects

    Science.gov (United States)

    Mahadzir, Nurul Husna; Omar, Mohd Faizal; Nawi, Mohd Nasrun Mohd

    2016-08-01

    In becoming a develop nation by 2020, Malaysia Government realized the need in providing affordable house to the public. Since Second Malaysia Plan, government has implemented various affordable housing projects and it continues until recent Malaysia Plan. To measure the effectiveness of the initiatives taken, public opinion is necessary. A social media platform has been seen as the most effective mechanism to get information on people's thought and feeling towards certain issues. One of the best ways to extract emotions and thoughts from what people post in social media is through Sentiment Analysis (SA). There are three different levels of analysis: document level, sentence level and feature level. Most of previous research focused on the classification of sentiment at document or sentence level. Unfortunately, both document and sentence level does not discover what exactly people like or not. While the analysis based on feature, there exist accuracy problem when classifying the sentiment scores. This paper will propose a new framework that focuses on sentiment classification scores at feature level to overcome the uncertainty and accuracy issues on the result.

  6. NRC licensing requirements: DOD options

    Energy Technology Data Exchange (ETDEWEB)

    Pike, W.J.; O' Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with /sup 90/Sr or /sup 238/Pu; radioisotopic dynamic electric generators with /sup 90/Sr or /sup 238/Pu; and applications of radioisotopes for luminous sources (lights) with /sup 3/H, /sup 85/Kr, or /sup 147/Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process.

  7. Establishment of licensing process for development reactors

    Energy Technology Data Exchange (ETDEWEB)

    Jo, Jong Chull; Yune, Young Gill; Kim, Woong Sik (and others)

    2006-02-15

    A study on licensing processes for development reactors has been performed to prepare the licensing of development reactors developed in Korea. The contents and results of the study are summarized as follows. The licensing processes for nuclear reactors in Korea, U.S.A., Japan, France, U.K., Canada, and IAEA were surveyed and analyzed to obtain technical bases necessary for establishing licensing processes applicable to development reactors in Korea. Based on the technical bases obtained the above analysis, the purpose, power output, and design characteristics of development reactors were analyzed in detail. The analysis results suggested that development reactors should be classified as a new reactor category (called as 'development reactor') separated from the current reactor categories such as the research reactor and the power reactor. Therefore, it is proposed to establish a new reactor category classified as 'development reactor' for the development reactors. And licensing processes, including licensing technical requirements, licensing document requirements, and other regulatory requirements, were also proposed for the development reactors. In order to institutionalize the licensing processes developed in this study, it is necessary to revise the current laws. Therefore, draft provisions of Atomic Energy Act, Enforcement Decree of the Atomic Energy Act, and Enforcement Regulation of the Atomic Energy Act have been developed for the preparation of the future legalization of the licensing processes proposed for the development reactors. Conclusively, a proposal of licensing processes and draft provisions of laws have been developed for the development reactors. The results proposed in this study can be applied directly to the licensing of the future development reactors. Furthermore, they will also contribute to establishing successfully the licensing processes of the development reactors.

  8. Licensing of Practices

    CERN Document Server

    2001-01-01

    All practices are licensed by Radiation Protection Centre (RPC). RPC verifies if license seeker is prepares to work with sources in an adequate and safe manner. Types of licences defined in the Republic of Lithuania are listed. Data on the number of licensees and of licenses issued in 1999-2001 is presented.

  9. 10 CFR 72.6 - License required; types of licenses.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false License required; types of licenses. 72.6 Section 72.6... Provisions § 72.6 License required; types of licenses. (a) Licenses for the receipt, handling, storage, and transfer of spent fuel or high-level radioactive waste are of two types: general and specific. Licenses...

  10. Small-Scale Hydroelectric Power Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  11. 76 FR 57720 - Intent To Grant an Exclusive Patent License

    Science.gov (United States)

    2011-09-16

    ... Department of the Air Force Intent To Grant an Exclusive Patent License SUMMARY: Pursuant to the provisions... exclusive license in any right, title and interest the United States Air Force has in: U.S. Patent... license for the invention described in this patent application will be granted unless a written...

  12. 77 FR 40590 - Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program...

    Science.gov (United States)

    2012-07-10

    ... Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program; Disability... Rehabilitation Research Projects and Centers Program--Disability and Rehabilitation Research Projects--Burn Model... Rehabilitation Research Projects and Centers Program-- Disability and Rehabilitation Research...

  13. Geospatial Applications on Different Parallel and Distributed Systems in enviroGRIDS Project

    Science.gov (United States)

    Rodila, D.; Bacu, V.; Gorgan, D.

    2012-04-01

    The execution of Earth Science applications and services on parallel and distributed systems has become a necessity especially due to the large amounts of Geospatial data these applications require and the large geographical areas they cover. The parallelization of these applications comes to solve important performance issues and can spread from task parallelism to data parallelism as well. Parallel and distributed architectures such as Grid, Cloud, Multicore, etc. seem to offer the necessary functionalities to solve important problems in the Earth Science domain: storing, distribution, management, processing and security of Geospatial data, execution of complex processing through task and data parallelism, etc. A main goal of the FP7-funded project enviroGRIDS (Black Sea Catchment Observation and Assessment System supporting Sustainable Development) [1] is the development of a Spatial Data Infrastructure targeting this catchment region but also the development of standardized and specialized tools for storing, analyzing, processing and visualizing the Geospatial data concerning this area. For achieving these objectives, the enviroGRIDS deals with the execution of different Earth Science applications, such as hydrological models, Geospatial Web services standardized by the Open Geospatial Consortium (OGC) and others, on parallel and distributed architecture to maximize the obtained performance. This presentation analysis the integration and execution of Geospatial applications on different parallel and distributed architectures and the possibility of choosing among these architectures based on application characteristics and user requirements through a specialized component. Versions of the proposed platform have been used in enviroGRIDS project on different use cases such as: the execution of Geospatial Web services both on Web and Grid infrastructures [2] and the execution of SWAT hydrological models both on Grid and Multicore architectures [3]. The current

  14. Sandia photovoltaic systems definition and application experiment projects

    Energy Technology Data Exchange (ETDEWEB)

    Jones, G.

    1983-04-01

    A compilation is given of the abstracts and visual material used in presentation at the Fourth Photovoltaic Systems Definition and Applications Projects Integration Meeting held at the Marriott Hotel, April 12-14, 1983, in Albuquerque, New Mexico. The meeting provided a forum for detailed analyses on recently completed and current activities. These activities include systems research, balance-of-system technology development, residential experimentation, and evaluation of intermediate-sized applications.

  15. Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff`s review process by interested members of the public and the industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission`s regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements.

  16. Nonlinear projective filtering; 1, Application to real time series

    CERN Document Server

    Schreiber, T

    1998-01-01

    We discuss applications of nonlinear filtering of time series by locally linear phase space projections. Noise can be reduced whenever the error due to the manifold approximation is smaller than the noise in the system. Examples include the real time extraction of the fetal electrocardiogram from abdominal recordings.

  17. Application of expert systems in project management decision aiding

    Science.gov (United States)

    Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David

    1987-01-01

    The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.

  18. 77 FR 50490 - Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and...

    Science.gov (United States)

    2012-08-21

    ... up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov... Legacy at Sinclair, a condominium complex, a permit to use project lands and waters for the...

  19. Small modular reactors: current status, economic aspects and licensing

    Energy Technology Data Exchange (ETDEWEB)

    Zimbron E, E. [Instituto Tecnologico de Estudios Superiores de Monterrey, Campus Santa Fe, Av. Carlos Lazo No. 100, Santa Fe, 01389 Mexico D. F. (Mexico); Puente E, F., E-mail: erick.zimbron@gmail.com [ININ, Direccion de Investigacion Cientifica, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2014-10-15

    Interest for nuclear energy had resurgence since the beginning of the new century. This was a consequence of the new world conditions and needs: increasing energy demands (mainly from developing countries), awareness of the importance of energetic security and the necessity of limiting carbon emissions. In this nuclear boom, Small Modular Reactors (SMRs) develop and start to consolidate as a viable option for the present energy market. Their modular characteristics, lower initial capital cost, passive safety features and their niche applications, situate them as a technology with various advantages. The following study will present and analysis that will help to comprehend the SMRs present status. Information will show planned reactors, reactors in construction and in operation, advantages and challenges of their implementation, relevant economic aspects and important licensing factors that need to be highlighted. The analysis showed that the SMR technology is still in an initial stage that could reach and important development point in the next ten years. In this period, many of the reactors that are in design stage or that are through their licensing process might be constructed and could be getting ready for a commercial status. On the other hand, it has been observed that there are two main economic factors that need to be considered for any SMRs implementation project. First, the costs (initial, operation, maintenance, fuel and decommissioning) and second their possible niche market applications. Additionally, it has been noted that the licensing process is one of the greatest challenges for SMR general development. Licensing is mainly related to topic such as Emergency Planning Zone, first-of-a-kind engineering, passive safety features, proliferation resistance, multiple module designs and staffing. Previous information will serve as a base for carrying out a feasibility assessment analysis for SMR in Mexico. This part will be the last section of the project

  20. 75 FR 39667 - Availability for Non-Exclusive or Partially Exclusive Licensing of a U.S. Patent Application

    Science.gov (United States)

    2010-07-12

    ... for preparing multivalent vaccines, recombinant DNA expression ] products and more particularly to..., Dr. Paul Mele, Office of Research and Technology Applications (ORTA), (301) 619- 6664, both...

  1. Image Processing Technology in the Motor Vehicle License Plate Recognition Technology Application%图像处理技术在机动车车牌自动识别技术中的应用

    Institute of Scientific and Technical Information of China (English)

    宁彬

    2013-01-01

    主要分析了图像处理技术在机动车车牌自动识别技术中的应用.按照车牌定位由彩色图转化到灰度图、车牌区域分割、车牌位置校正等步骤,对车牌字符的识别进行了分析,并对自动识别技术进行了改进.基于图像处理技术设计的机动车辆车牌自动识别系统,在保障交通顺畅运行方面发挥着巨大作用.从实际应用效果看图像处理技术在机动车车牌自动识别技术实际运用中效果良好,具有一定的推广价值.%The application of image processing technology in the motor vehicle license plate automatic identification technology was analyzed. In accordance with the license plate location transformed by the color chart to grayscale, license plate region segmentation, the license plate position correction step on the license plate character recognition, and automatic identification technology improvements. Motor vehicle car brand automatic identification system design based on the image processing technology, play a huge role in the protection of traffic running smoothly. From the effect of practical application of image processing technology in the motor vehicle license plate automatic identification technology to practical use in the good results, the promotional value.

  2. Vehicle License Plate Character Segmentation

    Institute of Scientific and Technical Information of China (English)

    Mei-Sen Pan; Jun-Biao Yan; Zheng-Hong Xiao

    2008-01-01

    Vehicle license plate (VLP) character segmentation is an important part of the vehicle license plate recognition system (VLPRS). This paper proposes a least square method (LSM) to treat horizontal tilt and vertical tilt in VLP images. Auxiliary lines are added into the image (or the tilt-corrected image) to make the separated parts of each Chinese character to be an interconnected region. The noise regions will be eliminated after two fusing images are merged according to the minimum principle of gray values.Then, the characters are segmented by projection method (PM) and the final character images are obtained. The experimental results show that this method features fast processing and good performance in segmentation.

  3. 77 FR 35960 - City of Hastings, MN; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-06-15

    ... Works Director, City of Hastings, Minnesota, 1225 Progress Drive, Hastings, MN 55033-1955, (651) 480... delete the two hydrokinetic turbines from the Mississippi Lock and Dam No. 2 conventional hydropower... conventional hydropower project has been returned to its pre- hydrokinetic unit condition. Therefore, the...

  4. 77 FR 27759 - City of Crystal Falls, MI; Notice of Application for Temporary Variance of License and Soliciting...

    Science.gov (United States)

    2012-05-11

    .... During the drawdown the City will conduct surveys for stranded mussels and fish. Additionally... Application: A copy of the application is available for inspection and reproduction at the Commission's Public... also available for inspection and reproduction at the address in item (h) above. m....

  5. 78 FR 30914 - Grand River Dam Authority Notice of Application for Temporary Variance of License and Soliciting...

    Science.gov (United States)

    2013-05-23

    ... Federal Energy Regulatory Commission Grand River Dam Authority Notice of Application for Temporary...: March 20, 2013, and supplemented on May 3, 2013, and May 16, 2013. d. Applicant: Grand River Dam..., Grand River Dam Authority, P.O. Box 409, Vinita, OK 74301; telephone: (918) 256-5545. i. FERC Contact:...

  6. 78 FR 57375 - Toutant Hydro Power, Inc.; Energy System, LLC.; Notice of Application for Transfer of License...

    Science.gov (United States)

    2013-09-18

    ... Power, Inc. (transferor) and Energy System, LLC (transferee) filed an application for transfer of... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Toutant Hydro Power, Inc.; Energy System, LLC.; Notice of Application...

  7. Development and application of new quality model for software projects.

    Science.gov (United States)

    Karnavel, K; Dillibabu, R

    2014-01-01

    The IT industry tries to employ a number of models to identify the defects in the construction of software projects. In this paper, we present COQUALMO and its limitations and aim to increase the quality without increasing the cost and time. The computation time, cost, and effort to predict the residual defects are very high; this was overcome by developing an appropriate new quality model named the software testing defect corrective model (STDCM). The STDCM was used to estimate the number of remaining residual defects in the software product; a few assumptions and the detailed steps of the STDCM are highlighted. The application of the STDCM is explored in software projects. The implementation of the model is validated using statistical inference, which shows there is a significant improvement in the quality of the software projects.

  8. Laser-activated remote phosphor light engine for projection applications

    Science.gov (United States)

    Daniels, Martin; Mehl, Oliver; Hartwig, Ulrich

    2015-09-01

    Recent developments in blue emitting laser diodes enable attractive solutions in projection applications using phosphors for efficient light conversion with very high luminance levels. Various commercially available projectors incorporating this technology have entered the market in the past years. While luminous flux levels are still comparable to lamp-based systems, lifetime expectations of classical lamp systems are exceeded by far. OSRAM GmbH has been exploring this technology for several years and has introduced the PHASER® brand name (Phosphor + laser). State-of-the-art is a rotating phosphor wheel excited by blue laser diodes to deliver the necessary primary colors, either sequentially for single-imager projection engines, or simultaneously for 3-panel systems. The PHASER® technology enables flux and luminance scaling, which allows for smaller imagers and therefore cost-efficient projection solutions. The resulting overall efficiency and ANSI lumen specification at the projection screen of these systems is significantly determined by the target color gamut and the light transmission efficiency of the projection system. With increasing power and flux level demand, thermal issues, especially phosphor conversion related, dominate the opto-mechanical system design requirements. These flux levels are a great challenge for all components of an SSL-projection system (SSL:solid-state lighting). OSRAḾs PHASER® light engine platform is constantly expanded towards higher luminous flux levels as well as higher luminance levels for various applications. Recent experiments employ blue laser pump powers of multiple 100 Watts to excite various phosphors resulting in luminous flux levels of more than 40 klm.

  9. Application of Technology in Project-Based Distance Learning

    Directory of Open Access Journals (Sweden)

    Ali Mehrabian

    2008-06-01

    Full Text Available Present technology and the accessibility of internet have made distance learning easier, more efficient, and more convenient for students. This technology allows instructors and students to communicate asynchronously, at times and locations of their own choosing, by exchanging printed or electronic information. The use of project-based approach is being recognized in the literature as a potential component of courses in the faculties of engineering, science, and technology. Instructors may have to restructure their course differently to accommodate and facilitate the effectiveness of distance learning. A project-based engineering course, traditionally taught in a classroom settings using live mode at the College of Engineering and Computer Sciences at the University of Central Florida (UCF has been transformed to a distance course taught using distance modes. In this case, pedagogical transitions and adjustments are required, in particular for obtaining an optimal balance between the course material and the project work. Project collaboration in groups requires communication, which is possible with extensive utilization of new information and communication technology, such as virtual meetings. This paper discusses the course transition from live to distance modes and touches on some issues as they relate to the effectiveness of this methodology and the lessons learned from its application within different context. More specifically, this discussion includes the benefit of implementing project-based work in the domain of the distance learning courses.

  10. Application of Image Processing in License Plate Identification%图像处理在车牌识别中的运用

    Institute of Scientific and Technical Information of China (English)

    姚兆楠

    2014-01-01

    License plate identification is to point to license plate characters extracted from vehicle image information by computer vision, image processing and pattern identification method. License plate identification can be divided into three parts:license plate location,character division and character identification. Realizing each part by using MATLAB software program and finally identify the license plate.%车牌识别是指通过计算机视觉、图像处理与模式识别能方法从车辆图像中提取车牌字符信息,从而确定车辆的身份。车牌识别分为车牌定位、字符分割、字符识别三大部分。采用MATLAB软件编程来实现每一个部分,最后识别出汽车牌照。

  11. 78 FR 21923 - City of Crystal Falls, MI; Notice of Application for Temporary Variance of License and Soliciting...

    Science.gov (United States)

    2013-04-12

    ... the City will conduct surveys for stranded mussels and fish. Additionally, recreational access will be... the application is available for inspection and reproduction at the Commission's Public Reference Room... also available for inspection and reproduction at the address in item (h) above. m....

  12. 78 FR 47800 - License Renewal Application for Byron Station, Units 1 and 2; Exelon Generation Company, LLC

    Science.gov (United States)

    2013-08-06

    ... authorized to develop and enforce relevant environmental standards; c. Affected State and local government agencies, including those authorized to develop and enforce relevant environmental standards; d. Any... Register on June 13, 2013 (78 FR 35646). A notice of acceptance for docketing of the application...

  13. 78 FR 46379 - Exelon Generation Company, LLC, License Renewal Application for Braidwood Station, Units 1 and 2

    Science.gov (United States)

    2013-07-31

    ... authorized to develop and enforce relevant environmental standards; c. Affected State and local government agencies, including those authorized to develop and enforce relevant environmental standards; d. Any... Register on June 13, 2013 (78 FR 35646). A notice of acceptance for docketing of the application...

  14. 15 CFR Appendix 1 to Part 960 - Filing Instructions and Information To Be Included in the Licensing Application

    Science.gov (United States)

    2010-01-01

    ... subsidiaries, with foreign nation or person, including copies if available; (3) A copy of the charter or other... sensor (IFOV, in-track, cross-track); (6) On-board storage capacity; (7) Navigation capabilities—GPS... benefit purposes, such as the study of the changing global environment. B. If the applicant is...

  15. 77 FR 39675 - Applications for Licensing as a Non-Leveraged Rural Business Investment Company Under the Rural...

    Science.gov (United States)

    2012-07-05

    ... economic development and the creation of wealth and job opportunities in rural areas and among individuals...: (202) 720-1400. VIII. Nondiscrimination Statement USDA prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex,...

  16. Artificial intelligence approach for spot application project system design

    Science.gov (United States)

    Lefevre, M. J.; Fisse, G.; Martin, E.; de Boissezon, H.; Galaup, M.

    1993-11-01

    Over the past four years, CNES has been engaged in a major programme focusing on the development of SPOT Operational Application Projects. With a total of sixty projects now complete, we can draw a number of meaningful conclusions and identify a number of objectives to be satisfied by advanced remote sensing methodology. One of the main conclusions points to the importance of human vision in studies on natural complex space imagery. This being so, visual recognition must be one of the main phases of the ``Pilot Project for the Application of Remote Sensing to Agricultural Statistics'': only human experts have the ability to make a meaningful analysis of Spot TM imagery. Non-expert operators will not be able to manage the subsequent rational production phase alone. The first part of this paper describes an approach to the formalization and modelling of expert know-how based on the use of artificial intelligence. The second part puts forward a cooperative operator/computer system based on a cognitive structure. Our proposal comprises 1) a specific knowledge base, 2) an ergonomic interface associated with functional software that is based on automatic image enhancement coupled with perception support functions.

  17. Licensing by modification Licensing by modification

    Directory of Open Access Journals (Sweden)

    Veneeta Dayal

    2008-04-01

    Full Text Available Abstract: This paper looks at the phenomena of licensing by modification, whereby an unacceptable noun phrase is redeemed by the presence of a modifier or an unavailable reading for a noun phrase is made available with the addition of a modifier. It argues that an optimal account of such phenomena should derive these effects from the interaction of the meanings of individual expressions in the sentence rather than by positing a formal licensing relation between the modifier and the noun it modifies. The general approach is explicated by considering the distribution of bare plurals in Italian and the availability of generic readings for plural definites in English. The overall goal is a modest one. It seeks to draw attention to properties of modification that go beyond set intersection by focusing on phenomena that have not so far been closely scrutinized in the literature. It uses the particular results to draw some conclusions about questions of general interest.Licensing by modification Abstract: This paper looks at the phenomena of licensing by modification, whereby an unacceptable noun phrase is redeemed by the presence of a modifier or an unavailable reading for a noun phrase is made available with the addition of a modifier. It argues that an optimal account of such phenomena should derive these effects from the interaction of the meanings of individual expressions in the sentence rather than by positing a formal licensing relation between the modifier and the noun it modifies. The general approach is explicated by considering the distribution of bare plurals in Italian and the availability of generic readings for plural definites in English. The overall goal is a modest one. It seeks to draw attention to properties of modification that go beyond set intersection by focusing on phenomena that have not so far been closely scrutinized in the literature. It uses the particular results to draw some conclusions about questions of general

  18. 78 FR 29393 - University of Missouri-Columbia Facility Operating License No. R-103

    Science.gov (United States)

    2013-05-20

    ... COMMISSION University of Missouri--Columbia Facility Operating License No. R-103 AGENCY: Nuclear Regulatory...) is considering an application for the renewal of Facility Operating License No. R-103 (``Application... application for the renewal of Facility Operating License No. R-103, which, currently authorizes the...

  19. 77 FR 23242 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-04-18

    ... the Banks Lake Pumped Storage Project (Banks Lake Project or project) to be located on Banks Lake and... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... December 1, 2011, the Grand Coulee Project Hydroelectric Authority filed an application for a preliminary...

  20. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  1. Overview of the GASP project; Field applications and economics

    Energy Technology Data Exchange (ETDEWEB)

    Sarshar, M.M.; Lovie, P.M. (Goodfellow Lovie Associates (GB))

    1992-03-01

    This paper reports that the aim of the Goodfellow Assocs. subsea production (GASP) project was to develop a subsea production system for use in the development of marginal oil fields. The project was divided into three phases that culminated in testing a prototype system in a dry dock. The GASP system enables manifolding of products, separation of gas from produced liquids, and transportation of gas and liquids, and transportation of gas and liquids through separate lines. The produced liquids are pumped with a single-phase pumping system that is highly modularized for ease of installation and retrieval of key components. GASP is suitable for deepwater application and development of marginal fields far from the host platform. The economics were assessed with probabilistic methods to weigh the uncertainties. Developing marginal fields with the GASP system looks attractive, offering a development cost of $2.50 to $5.50 per barrel in many typical instances.

  2. An evaluation approach for research project pilot technological applications

    Science.gov (United States)

    Marcelino-Jesus, Elsa; Sarraipa, Joao; Jardim-Goncalves, Ricardo

    2013-10-01

    In a world increasingly more competitive and in a constantly development and growth it's important that companies have economic tools, like frameworks to help them to evaluate and validate the technology development to better fits in each company particular needs. The paper presents an evaluation approach for research project pilot applications to stimulate its implementation and deployment, increasing its adequacy and acceptance to their stakeholders and consequently providing new business profit and opportunities. Authors used the DECIDE evaluation framework as a major guide to this approach, which was tested in the iSURF project to support the implementation of an interoperability service utility for collaborative supply chain planning across multiple domains supported by RFID devices.

  3. Technology Applications Group Multimedia CD-ROM Project

    Science.gov (United States)

    McRacken, Kristi D.

    1995-01-01

    To produce a multimedia CD-ROM for the Technology Applications Group which would present the Technology Opportunity Showcase (TOPS) exhibits and Small Business Innovative Research (SBIR) projects to interested companies. The CD-ROM format is being used and developed especially for those companies who do not have Internet access, and cannot directly visit Langley through the World Wide Web. The CD-ROM will include text, pictures, sound, and movies. The information for the CD-ROM will be stored in a database from which the users can query and browse the information, and future CD's can be maintained and updated.

  4. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Energy Regulatory Commission Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In... reviewed the application for license for the Martin Dam Hydroelectric Project (FERC No. 349), located...

  5. 76 FR 20657 - Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-04-13

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Wells Hydrolectric Project and Intention To Hold Public Meetings In... Office of Energy Projects has reviewed the application for license for the Wells Hydroelectric...

  6. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells Hydrolectric Project In accordance with the National Environmental... reviewed the application for license for the Wells Hydroelectric Project (FERC No. 2149), located on...

  7. 75 FR 3261 - Powertech (USA) Inc.; Dewey-Burdock Project; New Source Material License Application; Notice of...

    Science.gov (United States)

    2010-01-20

    ... quality, and the potential for degradation; Ecology: Wetlands, aquatic, terrestrial, economically and... National Environmental Policy Act,'' the NRC plans to use the environmental review process set forth in its... Policy Act (NEPA) process or the environmental review process related to the Dewey- Burdock Uranium...

  8. Allegheny County Dog Licenses

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — A list of dog license dates, dog breeds, and dog name by zip code. Currently this dataset does not include City of Pittsburgh dogs.

  9. Minimal Technologies Application Project, Hohenfels Training Area, Germany: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.; Hinchman, R.R.; Johnson, D.O. [Argonne National Lab., IL (United States). Energy Systems Div.; Severinghaus, W.D. [Corps of Engineers, Champaign, IL (United States); Brent, J.J. [Army Construction Engineering Research Lab., Champaign, IL (United States)

    1991-12-01

    At the US Army Hohenfels Training Area in Germany, more than 30 years of continuous and intensive tactical training has caused extensive environmental damage because of the loss of vegetative cover and accelerated soil erosion. A project was conducted to evaluate the cost-effectiveness and relative benefits of various revegetation procedures. These procedures involved amendment and seedbed preparation options that were combined with three different durations of site closure. The point-intercept method was used to measure the types and amounts of vegetation established and changes in the vegetative community. Over three growing seasons, applications of fertilizer and seed increased the percent grass, legume, and total vegetative cover. The duration of site closure had no influence on the types or amounts of ground cover established. Materials made up only 10% of the total cost of the fertilization and seeding operations. The results of the research indicate that less expensive methods of amendment application should be evaluated. The data also show that site closure is not practical, economical, or necessary. The results of this project suggest that a regular maintenance program consisting of seeding and fertilization is required to maintain adequate vegetative cover and control erosion on tactical training areas.

  10. Agile informatics: application of agile project management to the development of a personal health application.

    Science.gov (United States)

    Chung, Jeanhee; Pankey, Evan; Norris, Ryan J

    2007-10-11

    We describe the application of the Agile method-- a short iteration cycle, user responsive, measurable software development approach-- to the project management of a modular personal health record, iHealthSpace, to be deployed to the patients and providers of a large academic primary care practice.

  11. 78 FR 77114 - Pacific Gas and Electric Company: Notice of Application Accepted for Filing, Soliciting Comments...

    Science.gov (United States)

    2013-12-20

    ..., 2013. d. Applicants: Pacific Gas and Electric Company (licensee). e. Name of Projects: Potter Valley..., License Coordinator, Pacific Gas and Electric Company, Mail Code: N11C P.O. Box 770000 San Francisco, CA...

  12. An analysis on the licensing trends of nuclear power plant and outstanding licensing issues

    Energy Technology Data Exchange (ETDEWEB)

    Han, Kyoo Sung; Nam, Seung Duk; Jang, Keun Sun; Yang, Joon Suk; Park, Tae Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-08-01

    In this paper, nuclear licensing politics, procedures and regulatory trends of the national practices of both Korea and United States are reviewed and analyzed to begin with. The resolution process and regulatory status of severe accident issues, Unresolved Safety Issues(USIs) and Generic Safety Issues(GSIs) are also traced. Subsequently, the author suggests a scheme for resolving and preparing for anticipated licensing issues for Ulchin units 3 and 4, together with the establishment of outstanding licensing issues and regulatory criteria applicable to Ulchin units 3 and 4. 10 figs., 10 tabs., 22 refs. (Author).

  13. Use of the Legal-Institutional Analysis Model to assess hydropower licensing negotiations

    Science.gov (United States)

    Burkardt, N.; Lamb, B.L.; Lamb, B.L.; Garcia de Jalon, D.; Sabaton, C.; Souchon, Y.; Tamai, N.; Robinette, H.R.; Waddle, T.J.; Brinson, A.

    2003-01-01

    In the United States, the Federal Energy Regulatory Commission (FERC) is responsible for issuing or renewing licenses for hydropower projects owned and operated by power companies. During the licensing process, these companies are required to consult with agencies and other parties that are affected by project operating regimes. Typical participants include state and federal fish and wildlife agencies, environmental interest groups, and the FERC. One of the most difficult tasks facing participants is to reach agreement about what kinds of environmental conditions should be placed on license. Researchers at the United States Geological Survey developed a model to analyze the institutional context of natural resource disputes. The Legal-Institutional Analysis Model (LIAM) is a computerized model that allows an analyst to determine the likely behavior of each organization in a conflict. The model also analyzes the types and levels of negotiating power held by each organization. Researchers at the USGS have used the model in several cases involving hydropower license applications. To use the model, they facilitate workshops for stakeholder groups in order to develop a shared understanding of the likely obstacles and opportunities for successful resolution of the issues. This allows a systematic workshop analyses to develop strategies for successful negotiations, because they are able to better understand the negotiation problem and work more effectively with both their allies and their competitors.

  14. License plates location based on block projection and semantic restrictions%基于分块投影和语义约束的车牌定位算法

    Institute of Scientific and Technical Information of China (English)

    周欣; 蒋欣荣; 潘薇

    2014-01-01

    This paper presents a novel algorithm for license plates location. The input image is segmented by block projec-tion to obtain potential regions with plate characters. It picks up candidate regions of plates by clustering those potential regions with semantic restrictions. False plate regions are deleted according to texture characteristic. 3000 images are pro-cessed with an accuracy of 97.1%. At the same time, the average time is less than 35 ms. The results prove that the algo-rithm is effective enough to support real-time license plate recognition.%以提高车牌定位实时性和同时搜索多个车牌为目的,研究并提出一种基于分块投影和语义约束的车牌快速定位算法,通过投影分割处理得到候选车牌字符块,根据语义约束对字符块进行聚类得到候选车牌区域,根据纹理特征过滤伪车牌。对3000幅图像进行实验,定位成功率为97.1%,平均定位时间小于35 ms。实验证明这种算法适应性强、速度快,能够满足车牌实时识别的需求。

  15. 77 FR 40596 - Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program...

    Science.gov (United States)

    2012-07-10

    ... Rehabilitation Research Projects and Centers program published in the Federal Register on April 28, 2006 (71 FR... Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program; Disability... Rehabilitation Research Projects and Centers Program-- Disability and Rehabilitation Research Projects...

  16. 77 FR 41782 - City of Quincy; FFP Project 110, LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2012-07-16

    ... Energy Regulatory Commission City of Quincy; FFP Project 110, LLC; Notice of Competing Preliminary Permit... May 1, 2012, City of Quincy and FFP Project 110, LLC filed preliminary permit applications pursuant to... 62301; (217) 228-4500. FFP Project 110, LLC's proposed project would consist of: (1) Fourteen new...

  17. License Plate Recognition Based on Image Processing%基于图像处理的车牌识别研究

    Institute of Scientific and Technical Information of China (English)

    郑雪

    2014-01-01

    The application of image processing technique was put forward to identify the license plate aiming at solving the prob-lem of license plate recognition in the intelligent traffic management system. License plate location, character segmentation, and li-cense plate recognition are the most important three parts, which constitute the license plate recognition system. First, using HSV model and RGB model to identify and segment the color image, and preliminary positioning for the license plate image. Then li-cense plate tilt correction was processed by Radon transform, and using the projection method for license plate location and seg-mentation. At last, read the result of license information recognized. Simulation by MATLAB programming and experiment, the results show that using image processing technology can quickly identify the license plate, and is an effective method to study the license plate recognition.%针对智能交通管理系统中的车牌识别问题,提出应用图像处理技术对汽车的牌照进行识别。车牌定位(LPL, License Plate Location)、车牌分割(LPS, License Plate Segmentation)、车牌识别(LPR, License Plate Recognition)是实现车牌识别系统的最主要的三个部分。先采用HSV模型和RGB模型识别与分割彩色图像,并初步定位车牌图像;再采用radon变换实现车牌的倾斜校正,用投影法对车牌进行定位和分割;最后通过语音读出识别到的车牌信息。通过MATLAB编程进行实验仿真,结果表明利用图像处理技术能够快速地识别出汽车牌照,是一种研究车牌识别的有效方法。

  18. PMBOK® Application in project management in information units

    Directory of Open Access Journals (Sweden)

    Daniela Spudeit

    2017-04-01

    Full Text Available Introduction: The units of information are increasingly being seen as providing services organizations whose main input is the information that adds value to the company and the intellectual capital. Indicating a need for planning to meet the informational needs of its customers. Objective: The aim of this study is to recognize the project management as an alternative to improve from planning and implementation through solutions that meet these needs. Methodology: Was conduced a bibliographic research that pursuit to enhance the use of best practices in project management for helping, and supporting the management of information units. Results: As results, it is pointed out that all ten areas of PMBOK® are applicable to units of information and it is up to the librarian, promote the implementation, monitoring and completion of these processes. Conclusions: Information units is to promote access to information sources and so it is important that best practices are adopted the PMBOK ® as accelerate the launch of products and services, reduce costs, improve quality controls and optimize resources and efforts.

  19. Integrated Medical Model Project - Overview and Summary of Historical Application

    Science.gov (United States)

    Myers, J.; Boley, L.; Butler, D.; Foy, M.; Goodenow, D.; Griffin, D.; Keenan, A.; Kerstman, E.; Melton, S.; McGuire, K.; hide

    2015-01-01

    Introduction: The Integrated Medical Model (IMM) Project represents one aspect of NASA's Human Research Program (HRP) to quantitatively assess medical risks to astronauts for existing operational missions as well as missions associated with future exploration and commercial space flight ventures. The IMM takes a probabilistic approach to assessing the likelihood and specific outcomes of one hundred medical conditions within the envelope of accepted space flight standards of care over a selectable range of mission capabilities. A specially developed Integrated Medical Evidence Database (iMED) maintains evidence-based, organizational knowledge across a variety of data sources. Since becoming operational in 2011, version 3.0 of the IMM, the supporting iMED, and the expertise of the IMM project team have contributed to a wide range of decision and informational processes for the space medical and human research community. This presentation provides an overview of the IMM conceptual architecture and range of application through examples of actual space flight community questions posed to the IMM project. Methods: Figure 1 [see document] illustrates the IMM modeling system and scenario process. As illustrated, the IMM computational architecture is based on Probabilistic Risk Assessment techniques. Nineteen assumptions and limitations define the IMM application domain. Scenario definitions include crew medical attributes and mission specific details. The IMM forecasts probabilities of loss of crew life (LOCL), evacuation (EVAC), quality time lost during the mission, number of medical resources utilized and the number and type of medical events by combining scenario information with in-flight, analog, and terrestrial medical information stored in the iMED. In addition, the metrics provide the integrated information necessary to estimate optimized in-flight medical kit contents under constraints of mass and volume or acceptable level of mission risk. Results and Conclusions

  20. 78 FR 27181 - Notice of Intent To Grant Exclusive License

    Science.gov (United States)

    2013-05-09

    ... license to U.S. Patent Application Serial No. 13/005,168, ``Method and Apparatus for Measuring Peanut... Federal Government's patent rights in this invention are assigned to the United States of America, as represented by the Secretary of Agriculture. It is in the public interest to so license this invention as AIC...

  1. 77 FR 65673 - Prospective Grant of Exclusive Patent License

    Science.gov (United States)

    2012-10-30

    ... National Institute of Standards and Technology Prospective Grant of Exclusive Patent License AGENCY... patent license. SUMMARY: This is a notice in accordance with 35 U.S.C. 209(e) and 37 CFR 404.7(a)(1)(i... and commonwealths, to NIST's interest in the invention embodied in U.S. Patent Application No....

  2. 76 FR 45838 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2011-08-01

    ... federally-funded research and development. Foreign patent applications are filed on selected inventions to extend market coverage for companies and may also be available for licensing. ADDRESSES: Licensing... targeting of treatment Targeted treatment decreases non-specific killing of healthy, essential...

  3. 76 FR 49777 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2011-08-11

    ... federally-funded research and development. Foreign patent applications are filed on selected inventions to extend market coverage for companies and may also be available for licensing. ADDRESSES: Licensing... chemotherapy. The researchers have developed a quantitative antibody-based testing method for...

  4. 78 FR 36793 - Notice of Intent To Grant Exclusive License.

    Science.gov (United States)

    2013-06-19

    ... Non-Vacuum Applications,'' to XTherm LP, having its principal place of business at 1325 White Drive... prospective exclusive license will comply with the terms and conditions of 35 U.S.C. 209 and 37 CFR 404.7. DATES: The prospective exclusive license may be granted unless, within fifteen (15) days from the date...

  5. 10 CFR 50.51 - Continuation of license.

    Science.gov (United States)

    2010-01-01

    ... Commission upon the expiration of the period. Renewal of operating licenses for nuclear power plants is... NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... continue to maintain the facility, including, where applicable, the storage, control and maintenance of...

  6. A Novel Project Management Theory and Its Applicability

    Science.gov (United States)

    2008-03-01

    63 Table 8. F-16 Project Highest Level Activity / Entity List .................................. 68 Table 9. MSIP Stage II Activity / Entity List...75 Table 10. MSIP Stage II Decisions Table...OpenProj OpenProj is a free open source alternative for MS Project. OpenProj provide tools for a project manager to plan and control a project. Gantt Charts

  7. License plate detection algorithm

    Science.gov (United States)

    Broitman, Michael; Klopovsky, Yuri; Silinskis, Normunds

    2013-12-01

    A novel algorithm for vehicle license plates localization is proposed. The algorithm is based on pixel intensity transition gradient analysis. Near to 2500 natural-scene gray-level vehicle images of different backgrounds and ambient illumination was tested. The best set of algorithm's parameters produces detection rate up to 0.94. Taking into account abnormal camera location during our tests and therefore geometrical distortion and troubles from trees this result could be considered as passable. Correlation between source data, such as license Plate dimensions and texture, cameras location and others, and parameters of algorithm were also defined.

  8. 77 FR 2966 - Rock River Beach, Inc.; Notice of Application Tendered for Filing With the Commission and...

    Science.gov (United States)

    2012-01-20

    ... Energy Regulatory Commission Rock River Beach, Inc.; Notice of Application Tendered for Filing With the...: Exemption from Licensing. b. Project No.: 14345-000. c. Filing Date: January 5, 2012. d. Applicant: Rock River Beach, Inc. e. Name of Project: Rock River Beach Hydroelectric Project. f. Location: On the...

  9. 76 FR 13174 - Pacific Gas and Electric Company; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2011-03-10

    ... filed with the Commission and is available for public inspection. a. Type of Application: Subsequent License--Transmission Line Only. b. Project No: P-2479-011. c. Date Filed: February 22, 2011. d. Applicant: Pacific Gas and Electric Company. e. Name of Project: French Meadows Transmission Line Project....

  10. 75 FR 30864 - NUREG-1520, “Standard Review Plan for the Review of a License Application for a Fuel Cycle...

    Science.gov (United States)

    2010-06-02

    ... INFORMATION CONTACT: Cinthya Rom n Cuevas, Chemical Engineer, Office of Nuclear Material Safety and Safeguards... and use of Special Nuclear Materials to produce nuclear reactor fuel. The licensing guidance revision... readiness reviews. The SRP has been updated to improve and enhance the guidance by providing...

  11. MEX04/058 supporting the license renewal of the LVNPP

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, A.; Arganis, C.; Viais, J.; Mendoza, G.; Lucatero, M. A.; Contreras, A., E-mail: angeles.diaz@inin.gob.m [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2010-10-15

    Nuclear power plants in the United States are authorized to operate for 40 years. However, this 40-year period was chosen based on economic considerations and not on technological restrictions or safety aspects. In general, the operation of equipment, systems and components in a nuclear power plant is subject to rigorous maintenance and inspection monitoring under strict surveillance programs throughout their life. In fact, according to the Nuclear Energy Institute, in December 2009, 59 nuclear power plants in the United States had already reached the 40 years of the original operating license and carried out their renewal process, extending their operation for up to 20 more years. These 59 nuclear power plants carried out their renewal process, basing their operation mainly on safety reviews that validated the good working order of systems, structures and components, meeting the technical specifications required, as well as complying with the specific safety provisions for prolonging the use of a operating license. The owner is responsible for showing the Regulatory Agency that it is capable of effectively managing the aging of the systems, structures and components,guaranteeing their good working order during the renewal period. In the specific case of Mexico, Unit 1 of the Laguna Verde Nuclear Power Plant (LVNPP) has an original 30-year license, with almost 20 years of proper operation, for which, in order to request a license extension, it is necessary to begin management activities, which allow for constituting and submitting the license renewal application to the Regulatory Agency in order to continue its commercial operation. This paper presents some of most important activities carried out by Instituto Nacional de Investigaciones Nucleares and LVNPP in the international project MEX04/058, related to Plant Life Management as a support of the beginning of plant license renewal process. (Author)

  12. 77 FR 4887 - DOE Patent Licensing Regulations

    Science.gov (United States)

    2012-02-01

    ... Part 781 RIN 1990-AA41 DOE Patent Licensing Regulations AGENCY: Office of the General Counsel, Department of Energy. ACTION: Final rule. SUMMARY: The Department of Energy (DOE) is amending its patent... patents or patent applications vested in the United States of America, as represented by or in the...

  13. Secure matching of Dutch car license plates

    NARCIS (Netherlands)

    Sunil, A.B.; Erkiny, Z.; Veugenyz, T.

    2016-01-01

    License plate matching plays an important role in applications like law enforcement, traffic management and road pricing, where the plate is first recognized and then compared to a database of authorized vehicle registration plates. Unfortunately, there are several privacy related issues that should

  14. A License To Deal.

    Science.gov (United States)

    Sanville, Tom

    1999-01-01

    Discusses consortium-based licensing as a means of meeting libraries' information resources needs. Topics include information needs, the need for more affordable information, requirements for libraries and for vendors, competition across disciplines, saving money, pricing and market practices, experiences at OhioLINK, and future possibilities.…

  15. Understanding Licensing Behavior

    DEFF Research Database (Denmark)

    Cabaleiro, Goretti; Moreira, Solon; Reichstein, Toke

    The potential for rent dissipation has been argued to be the main cause of firms? licensing out behavior being stifled.However, this aspect has been scarcely studied empirically. We draw on rent dissipation arguments, and hypothesize that firms suffering from the not-invented-here (NIH) syndrome...

  16. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

  17. Project Management Methodology for the Development of M-Learning Web Based Applications

    Directory of Open Access Journals (Sweden)

    Adrian VISOIU

    2010-01-01

    Full Text Available M-learning web based applications are a particular case of web applications designed to be operated from mobile devices. Also, their purpose is to implement learning aspects. Project management of such applications takes into account the identified peculiarities. M-learning web based application characteristics are identified. M-learning functionality covers the needs of an educational process. Development is described taking into account the mobile web and its influences over the analysis, design, construction and testing phases. Activities building up a work breakdown structure for development of m-learning web based applications are presented. Project monitoring and control techniques are proposed. Resources required for projects are discussed.

  18. From the Chemistry Lab to Licensing

    Science.gov (United States)

    Savino, Joseph M.; Street, Kenneth W.; Philipp, Warren H.

    1998-01-01

    This is a story of technology maturation and transfer, and licensing. It traces the history of the recently patented ion- exchange material (IEM) from the accidental discovery that this polymer, a battery separator of marginal performance, picked up copper from distilled water passing through corroded copper tubing in the laboratory, to a point where five organizations and one individual have applied for licenses to manufacture and market it or to use it in a wide variety of applications. This story discusses in detail the problems of converting an immature technology into a mature and eventually commercialized technology, without dedicated resources. Readers will develop an appreciation for how the obstacles to maturation and licensing of the technology were faced and overcome. The lessons learned will be discussed, with the hope of enhancing the technology transfer process.

  19. Patents and licensing in pharmaceutical industry

    Directory of Open Access Journals (Sweden)

    Katerina Ancevska Netkovska

    2005-05-01

    Full Text Available Intellectual property rights (IPR have been defined as ideas, inventions, and creative expressions based on which there is a public willingness to bestow the status of property. IPR provide certain exclusive rights to the inventors or creators of that property, in order to enable them to reap commercial benefits from their creative efforts or reputation. There are several types of intellectual property protection like patent, copyright, trademark, etc. Patent is recognition for an invention, which satisfies the criteria of global novelty, non-obviousness, and industrial application. IPR is prerequisite for better identification, planning, commercialization, rendering, and thereby protection of invention or creativity. Each industry should evolve its own IPR policies, management style, strategies, and so on depending on its area of specialty. Pharmaceutical industry currently has an evolving IPR strategy requiring a better focus and approach in the coming era. The protection of inventions with patents in the pharmaceutical industry have a specific role in the development of society and represent one of the drivers of economic development. The license agreements are considered as one of the most common types of transfer of industrial property rights. The right holders often transfer their rights to patents by concluding licensing agreement. While the patent license may give the license a right to use the technology many license agreements have provisions for the transfer of know-how in addition to the patent.

  20. Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

    Energy Technology Data Exchange (ETDEWEB)

    Hanna, Philippe [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands); Langdon, Esther Jean [Department of Anthropology, Center for Philosophy and Human Sciences, Federal University of Santa Catarina PO Box 5104, 88040-970, Florianópolis, SC (Brazil); Arts, Jos [Department of Planning, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands)

    2014-04-01

    The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorly implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be

  1. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... Operator License, Marine Radio Operator Permit, First Class Radiotelegraph Operator's Certificate, Second... Radio Operator's License, Restricted GMDSS Radio Operator License, GMDSS Radio Maintainer's License,...

  2. 42 CFR 431.703 - Licensing requirement.

    Science.gov (United States)

    2010-10-01

    ... (CONTINUED) MEDICAL ASSISTANCE PROGRAMS STATE ORGANIZATION AND GENERAL ADMINISTRATION State Programs for Licensing Nursing Home Administrators § 431.703 Licensing requirement. The State licensing program must provide that only nursing homes supervised by an administrator licensed in accordance with...

  3. 77 FR 41781 - City of Quincy; FFP Project 109, LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2012-07-16

    ... Energy Regulatory Commission City of Quincy; FFP Project 109, LLC; Notice of Competing Preliminary Permit... May 1, 2012, City of Quincy and FFP Project 109, LLC filed preliminary permit applications pursuant to...: Mr. Charles Bevelheimer, 730 Maine Street, Quincy, IL 62301; (217) 228-4500. FFP Project 109,...

  4. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  5. 76 FR 18769 - Prospective Grant of Exclusive License: Device and System for Two Dimensional Analysis of...

    Science.gov (United States)

    2011-04-05

    ... HUMAN SERVICES National Institutes of Health Prospective Grant of Exclusive License: Device and System... continuing applications and foreign counterparts to 2-D Bio, LLC, having a place of business in Gaithersburg... exclusive license to the University of Maryland's rights in the invention. The prospective exclusive license...

  6. 47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.

    Science.gov (United States)

    2010-10-01

    ... RADIO OPERATORS Examination System § 13.201 Qualifying for a commercial operator license or endorsement. (a) To be qualified to hold any commercial radio operator license, an applicant must have a... commercial radio operator license, other than the Restricted Radiotelephone Operator Permit and...

  7. 10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.

    Science.gov (United States)

    2010-01-01

    ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL... hearings in proceedings for issuance of manufacturing licenses. In addition to complying with applicable requirements of § 51.31(c), in a proceeding for the issuance of a manufacturing license, the presiding...

  8. Eleventh annual Department of Energy low-level waste management conference. Volume 3: Waste characterization, waste reduction and minimization, prototype licensing application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-11-01

    Thirteen papers are presented in volume 3. The seven papers on waste characterization discuss sampling, analysis, and certification techniques for low-level radioactive wastes. Three papers discuss US DOE waste minimization policies and regulations, Y-12 Plant`s reduction of chlorinated solvents, and C-14 removal from spent resins. The last three papers discuss the licensing studies for earth-mounded concrete bunkers for LLW disposal. Papers have been processed separately for inclusion on the data base.

  9. Eleventh annual Department of Energy low-level waste management conference. Volume 3: Waste characterization, waste reduction and minimization, prototype licensing application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-11-01

    Thirteen papers are presented in volume 3. The seven papers on waste characterization discuss sampling, analysis, and certification techniques for low-level radioactive wastes. Three papers discuss US DOE waste minimization policies and regulations, Y-12 Plant`s reduction of chlorinated solvents, and C-14 removal from spent resins. The last three papers discuss the licensing studies for earth-mounded concrete bunkers for LLW disposal. Papers have been processed separately for inclusion on the data base.

  10. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mill Town Power Project; Notice of Preliminary Permit Application Accepted..., 2011, Mill Town Power Project filed an application for a preliminary permit, pursuant to section...

  11. 78 FR 69700 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2013-11-20

    ... available (human). Inventors: Thomas B. Nutman, Ravi Varatharajalu, Franklin A. Neva (all of NIAID...--International PCT Application No. PCT/US12/62197 filed 26 October 2012 Licensing Contact: Kevin W. Chang, Ph.D...

  12. 47 CFR 22.221 - Eligibility for partitioned licenses.

    Science.gov (United States)

    2010-10-01

    ... PUBLIC MOBILE SERVICES Licensing Requirements and Procedures Competitive Bidding Procedures § 22.221... short-form applications and for submitting upfront payments and down payments contained in this...

  13. 47 CFR 27.1207 - BTA license authorization.

    Science.gov (United States)

    2010-10-01

    ....1207 BTA license authorization. (a) Winning bidders must file an application (FCC Form 601) for an... quiet zones under § 1.924 of this chapter. (2) Any antenna structure that requires notification to...

  14. Future Flows Climate: an ensemble of 1-km climate change projections for hydrological application in Great Britain

    Directory of Open Access Journals (Sweden)

    C. Prudhomme

    2012-11-01

    Full Text Available The dataset Future Flows Climate was developed as part of the project ''Future Flows and Groundwater Levels'' to provide a consistent set of climate change projections for the whole of Great Britain at both space and time resolutions appropriate for hydrological applications, and to enable climate change uncertainty and climate variability to be accounted for in the assessment of their possible impacts on the environment.

    Future Flows Climate is derived from the Hadley Centre's ensemble projection HadRM3-PPE that is part of the basis of UKCP09 and includes projections in available precipitation (water available to hydrological processes after snow and ice storages have been accounted for and potential evapotranspiration. It corresponds to an 11-member ensemble of transient projections from January 1950 to December 2098, each a single realisation from a different variant of HadRM3. Data are provided on a 1-km grid over the HadRM3 land areas at a daily (available precipitation and monthly (PE time step as netCDF files.

    Because systematic biases in temperature and precipitation were found between HadRM3-PPE and gridded temperature and precipitation observations for the 1962–1991 period, a monthly bias correction procedure was undertaken, based on a linear correction for temperature and a quantile-mapping correction (using the gamma distribution for precipitation followed by a spatial downscaling. Available precipitation was derived from the bias-corrected precipitation and temperature time series using a simple elevation-dependant snow-melt model. Potential evapotranspiration time series were calculated for each month using the FAO-56 Penman-Monteith equations and bias-corrected temperature, cloud cover, relative humidity and wind speed from HadRM3-PPE along with latitude of the grid and the day of the year.

    Future Flows Climate is freely available for non-commercial use under certain licensing conditions. It is the

  15. License to Learn

    DEFF Research Database (Denmark)

    Leone, Maria Isabella; Boccardelli, Paolo; Reichstein, Toke;

    2016-01-01

    This article introduces the distinction between thin and thick contracts to the investigation of licensing-in as a mechanism for technological learning. Thick contracts include a clause specifying that the licensors are obligated to assist the licensees in assimilating and integrating....... Licensees that are more familiar with the licensed technology are in less need of assistance from the licensors to assimilate and integrate the knowledge. However, this substitution effect is neutralized once the hurdle of invention has been overcome, meaning that the licensees have succeeded to ignite...... the technology. Drawing on a sample of 133 licensees and an equal number of matched nonlicensees, we present empirical evidence that thick contracts propel the licensees' likelihood of introducing new inventions. It is also found that thick contracts act as a substitute for licensees' absorptive capacity...

  16. Application of EMTP in China s UHVAC Pilot Project

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    Considering the characteristics of the UHVAC Pilot Project in China,the importance of study on electromagnetic transient overvoltage in UHVAC projects is demonstrated in this paper.Through analysis and comparison on the simulation programs for electromagnetic transient overvoltages,EMTP is then recommended for the UHVAC Pilot Project in China.The element models in EMTP used in simulating power frequency overvoltage and power resonance of non-entire phase operation,etc.,are introduced.The paper also points o...

  17. Application of EMTP in China's UHVAC Pilot Project

    Institute of Scientific and Technical Information of China (English)

    Fan Jianbin; Zhang Cuixia; Ge Dong; Zhang Liuchun

    2009-01-01

    @@ Considering the characteristics of the UHVAC Pilot Project in China, the importance of study on electromagnetic transient overvoltage in UHVAC projects is demonstrated in this paper. Through analysis and comparison on the simulation programs for electromagnetic transient overvoltages,EMTP is then recommended for the UHVAC Pilot Project in China. The element models in EMTP used in simulating power frequency overvoltage and power resonance of non-entire phase operation, etc., are introduced. The paper also points out that extra attention will be needed when simulating power frequency sequence parameters and line corona. The research outcome provides valuable references for both oversea and domestic UHVAC projects.

  18. A hybrid incremental projection method for thermal-hydraulics applications

    Science.gov (United States)

    Christon, Mark A.; Bakosi, Jozsef; Nadiga, Balasubramanya T.; Berndt, Markus; Francois, Marianne M.; Stagg, Alan K.; Xia, Yidong; Luo, Hong

    2016-07-01

    A new second-order accurate, hybrid, incremental projection method for time-dependent incompressible viscous flow is introduced in this paper. The hybrid finite-element/finite-volume discretization circumvents the well-known Ladyzhenskaya-Babuška-Brezzi conditions for stability, and does not require special treatment to filter pressure modes by either Rhie-Chow interpolation or by using a Petrov-Galerkin finite element formulation. The use of a co-velocity with a high-resolution advection method and a linearly consistent edge-based treatment of viscous/diffusive terms yields a robust algorithm for a broad spectrum of incompressible flows. The high-resolution advection method is shown to deliver second-order spatial convergence on mixed element topology meshes, and the implicit advective treatment significantly increases the stable time-step size. The algorithm is robust and extensible, permitting the incorporation of features such as porous media flow, RANS and LES turbulence models, and semi-/fully-implicit time stepping. A series of verification and validation problems are used to illustrate the convergence properties of the algorithm. The temporal stability properties are demonstrated on a range of problems with 2 ≤ CFL ≤ 100. The new flow solver is built using the Hydra multiphysics toolkit. The Hydra toolkit is written in C++ and provides a rich suite of extensible and fully-parallel components that permit rapid application development, supports multiple discretization techniques, provides I/O interfaces, dynamic run-time load balancing and data migration, and interfaces to scalable popular linear solvers, e.g., in open-source packages such as HYPRE, PETSc, and Trilinos.

  19. 微课在执业药师成人学历教育中的应用%Application of Micro-lesson in the Licensed Pharmacist for Adult Education

    Institute of Scientific and Technical Information of China (English)

    刘伟; 王慧玲; 胡志军; 阿有梅

    2016-01-01

    由于历史的原因,我国目前取得执业药师资格的人群中一部分学历层次普遍较低,缺乏系统的理论知识和应用能力,急需进行成人学历教育;但成人在职的特点制约了学习效果。本文在分析执业药师学习特点的基础上,论证了微课所具有的时间短、内容少,资源小,情境真实,便于自主学习和交互性强的特点,适应于执业药师成人学历教育。针对微课在执业药师成人学历教育中的应用,提出微课在教学目标上应针对执业药师定位;在教学内容上应针对执业药师学历提升要求系列化;在教学手段和技术上,应和执业药师药学服务实践相结合;在教学资源方面,应满足执业药师在指导下自主学习的需要。%Due to historical reasons,some people who acquired licensed pharmacist qualifications currently in china are generally at low education levels,lack of systematic theoretical knowledge and ability,and it is an urgent need for adult education.However,the characteristics of the adults on job restrict their learn-ing results.Based on the analysis of learning characteristics of the pharmacist,this paper has demonstrated that the micro-lesson has characteristics of a short time, less content, smaller resources, real situations, convenience for autonomous learning and frequent interaction.These characteristics are adapted to the licensed pharmacist for adult education.This paper also puts forward some suggestions for the application of micro-lesson in licensed pharmacists for adult education.Teaching objectives of micro-lesson should be positioned for licensed pharmacists;Teaching content should be serialized for promoting education level of the licensed pharmacists;On the teaching methods and technology,it should be combined with pharma-ceutical care practice of licensed pharmacists;In the aspect of teaching resources,it should be meet the needs of autonomous learning for licensed

  20. Fuzzy Assessment Method and Its Application to Selecting Project Managers

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    Open competition is a new form of the assessment of candidates and selection of project managers. This has many merits compared to the traditional administrative method of appointment. This article introduces a method of fuzzy assessment of project manager candidates. Fuzzy assessment unifies objective qualitative and quantitative appraisal and can be used for improving decision-making in the selection process.