WorldWideScience

Sample records for license application project

  1. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  2. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  3. 76 FR 71082 - Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application...

    Science.gov (United States)

    2011-11-16

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-9091; NRC-2011-0148] Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application; Notice of Intent To Prepare a... intent to prepare a supplemental environmental impact statement. SUMMARY: Strata Energy, Inc. (Strata...

  4. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  5. 76 FR 40905 - Turnagain Arm Tidal Electric Energy Project; Notice of Intent To File License Application, Filing...

    Science.gov (United States)

    2011-07-12

    ... Tidal Electric Energy Project; Notice of Intent To File License Application, Filing of Pre-Application....: 13509-001. c. Dated Filed: May 11, 2011. d. Submitted By: Turnagain Arm Tidal Energy Corporation. e. Name of Project: Turnagain Arm Tidal Electric Energy Project. f. Location: Of the Upper Cook Inlet off...

  6. 75 FR 3261 - Powertech (USA) Inc.; Dewey-Burdock Project; New Source Material License Application; Notice of...

    Science.gov (United States)

    2010-01-20

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-9075; NRC-2009-0575] Powertech (USA) Inc.; Dewey... review process related to the Dewey- Burdock Uranium Project application, please contact the NRC... documents associated with the Dewey-Burdock Uranium Project, including the license application, are...

  7. International assistance. Licensing assistance project

    International Nuclear Information System (INIS)

    Aleev, A.

    1999-01-01

    Description of licensing assistance project for VATESI is presented. In licensing of unit No.1 of INPP VATESI is supported by many western countries. Experts from regulatory bodies or scientific organizations of those countries assist VATESI staff in reviewing documentation presented by INPP. Among bilateral cooperation support is provided by European Commission through Phare programme

  8. IRIS pre-application licensing

    International Nuclear Information System (INIS)

    Carelli, Mario D.; Kling, Charles L.; Ritterbusch, Stanley E.

    2003-01-01

    This paper presents the approach to pre-application licensing by the International Reactor Innovative and Secure (IRIS), and advanced, integral reactor design with a thermal power of 1000 MW. The rationale for the pre-application licensing is discussed. Since IRIS technology is based on proven LWR experience, the project will rely on AP600/AP1000 precedent and will focus during the pre-application on long lead and novel items. A discussion of the evolution of the project to significantly reduce licensing issues is provided, followed by a summary of the IRIS safety-by-design which provides a formidable first step in the Defense in Depth approach. The effects of the safety-by-design, as well as of passive systems, on the IRIS safety will be investigated in a proposed testing program that will be reviewed by NRC during the pre-application. Documentation to be provided to NRC is discussed. Early design analyses indicate that the benefits of the IRIS safety-by-design approach are so significant that the basic premise of current emergency planning regulations (i.e., likelihood of core damage) will be reduced to the extent that special emergency response planning beyond the exclusion area boundary may not be needed. How this very significant outcome can be effected through a highly risk-informed licensing is discussed. (author)

  9. Licensing Process for International Projects

    International Nuclear Information System (INIS)

    Raetzke, Christan

    2014-01-01

    Christan Raetzke, lawyer, then outlined why nuclear constructions were always international projects and in which cases it would make sense to also make the licensing process be international. His law consulting firm CONLAR focuses specifically on design review so he could adequately present why an international process would make a lot of sense without being a loss of sovereignty

  10. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  11. 78 FR 51753 - AUC, LLC Reno Creek, In Situ Project, New Source Material License Application

    Science.gov (United States)

    2013-08-21

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 040-09092; [NRC-2013-0164] AUC, LLC Reno Creek, In Situ..., AUC, LLC (AUC) submitted to the U.S. Nuclear Regulatory Commission (NRC) an application for a new... and operation, and decommissioning of AUC's proposed in-situ uranium recovery (ISR, also known as in...

  12. Licensing aspects regarding the RBMN project

    International Nuclear Information System (INIS)

    Cuccia, Valeria; Sacramento, Arivaldo M.; Aleixo, Bruna L.; Ferreira, Vinicius V.M.

    2013-01-01

    The licensing process of a waste disposal facility is a complex and demanding undertaking. It proceeds in phases, starting with the site selection and ending many decades later, when the radionuclides decayed and no longer offer possible hazard. That is one of the reasons why the licensing process for the Brazilian repository for low and intermediate level radioactive waste (RBMN Project) is a challenge for all the technicians involved. Besides that, the only national experience associated to this subject arose after a radiological accident in the State of Goias, in 1987. Two different institutions are involved in this licensing process: IBAMA, for environmental licensing, and CNEN, for nuclear licensing. Both of them will evaluate the possible impacts caused by the waste disposal, so it is essential to avoid conflicts and duplications of activities. The RBMN project has different teams for each main activity, and one of them is the Licensing group. This team has been planning the licensing activities for the repository, studying the legal framework and estimating costs and execution time for each step. This paper presents the status of the licensing activities regarding to the RBMN project done by the CNEN staff. (author)

  13. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  14. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  15. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... Conditions § 431.73 Continuing accuracy of license application; application for modification of license. (a...

  16. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  17. Licensing Review in R+D Projects

    OpenAIRE

    Alessandro, Orsi

    2014-01-01

    FOSS packages are becoming ever more present in R&D projects carried out a variety of entities, including large corporations. I will focus on how legal risks associated with the use of FOSS licenses can be assessed and discuss measures directed to risk mitigation.

  18. PROCESS FOR LICENSE APPLICATION DEVELOPMENT FOR THE GEOLOGIC REPOSITORY

    International Nuclear Information System (INIS)

    DOUGLAS M. FRANKS AND NORMAN C. HENDERSON

    1997-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the U.S. Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, (section)60.21ff and (section)60.31ff. This paper discusses the process the Yucca Mountain Site Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the ''Technical Guidance Document for Preparation of the License Application'' (TGD), currently in development

  19. Process for license application development for the geologic repository

    International Nuclear Information System (INIS)

    Franks, D.M.; Henderson, N.C.

    1998-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the US Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, section 60.21ff and section 60.31ff. This paper discusses the process the Yucca Mountain Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the Technical Guidance Document for Preparation of the License Application (TGD), currently in development

  20. Mock Site Licensing Demonstration Project. Final report

    International Nuclear Information System (INIS)

    Roop, R.D.

    1986-06-01

    The Mock Site Licensing Demonstration Project developed the Low-Level Radioactive Waste Siting Simulation, a role-playing exercise designed to facilitate the process of siting and licensing disposal facilities for low-level waste (LLW). This report describes the development, contant, and usefulness of the siting simulation. The simulation was designed by Harvard University's Program on Negotiation; it can be conducted at a workshop or conference, involves 14 or more participants, and requires about eight hours to complete. The simulation consists of two sessions. In the first, participants negotiate the selection of siting criteria, and in the second, a preferred site for a facility is chosen from three candidate sites. The project sponsored two workshops (in Boston, Massachusetts and Richmond, Virginia) in which the simulation was conducted for persons involved in planning for LLW. It is concluded that the siting simulation can be useful in three ways: (1) as a tool for information dissemination, (2) as a vehicle that can foste communication among parties in conflict, and (3) as a step toward consensus building and conflict resolution. The DOE National Low-Level Waste Management Program is now making the siting simulation available for use by states, regional compacts, and other organizations involved in development of LLW disposal facilities

  1. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  2. 21 CFR 515.10 - Medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Medicated feed mill license applications. 515.10... (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.10 Medicated feed mill license applications. (a) Medicated feed mill license applications (Forms FDA 3448) may...

  3. Personality traits of Turkish handgun license applicants.

    Science.gov (United States)

    Selek, Salih; Can, Serdar S; Yabanoglu, Ihsan

    2012-10-01

    Several theories have sought to explain the motivations for handgun possession and the relationship with personality. Perception of handguns also has cultural variations. The aim of the study is to evaluate handgun license applicants' personality profiles. 109 handgun license applicants were included in the study. Temperament and Character Inventory (TCI) scores of the applicants were recorded. Scores were compared with Turkish and American normative data for the Inventory. The study group had significantly lower subscores on novelty seeking, harm avoidance, and higher subscores on reward dependence and persistence compared to Turkish norms and significantly lower subscores on novelty seeking, reward dependence, and self-directedness compared to American norms. Results indicate that Turkish handgun license applicants' personality features are more similar to American norms.

  4. 77 FR 65887 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-10-31

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . ACM Logistics & Consulting... Type: New OFF License; Highland Project Logistics, Inc. (NVO & OFF), 35 Constitution Drive, Suite A.... Bonner, Special Manager (QI), Martine L. Plunkett, Manager, Application Type: Additional QI; Radiant...

  5. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  6. INTERNAL HAZARDS ANALYSIS FOR LICENSE APPLICATION

    Energy Technology Data Exchange (ETDEWEB)

    R.J. Garrett

    2005-02-17

    The purpose of this internal hazards analysis is to identify and document the internal hazards and potential initiating events associated with preclosure operations of the repository at Yucca Mountain. Internal hazards are those hazards presented by the operation of the facility and by its associated processes that can potentially lead to a radioactive release or cause a radiological hazard. In contrast to external hazards, internal hazards do not involve natural phenomena and external man-made hazards. This internal hazards analysis was performed in support of the preclosure safety analysis and the License Application for the Yucca Mountain Project. The methodology for this analysis provides a systematic means to identify internal hazards and potential initiating events that may result in a radiological hazard or radiological release during the repository preclosure period. These hazards are documented in tables of potential internal hazards and potential initiating events (Section 6.6) for input to the repository event sequence categorization process. The results of this analysis will undergo further screening and analysis based on the criteria that apply to the performance of event sequence analyses for the repository preclosure period. The evolving design of the repository will be re-evaluated periodically to ensure that internal hazards that have not been previously evaluated are identified.

  7. INTERNAL HAZARDS ANALYSIS FOR LICENSE APPLICATION

    International Nuclear Information System (INIS)

    Garrett, R.J.

    2005-01-01

    The purpose of this internal hazards analysis is to identify and document the internal hazards and potential initiating events associated with preclosure operations of the repository at Yucca Mountain. Internal hazards are those hazards presented by the operation of the facility and by its associated processes that can potentially lead to a radioactive release or cause a radiological hazard. In contrast to external hazards, internal hazards do not involve natural phenomena and external man-made hazards. This internal hazards analysis was performed in support of the preclosure safety analysis and the License Application for the Yucca Mountain Project. The methodology for this analysis provides a systematic means to identify internal hazards and potential initiating events that may result in a radiological hazard or radiological release during the repository preclosure period. These hazards are documented in tables of potential internal hazards and potential initiating events (Section 6.6) for input to the repository event sequence categorization process. The results of this analysis will undergo further screening and analysis based on the criteria that apply to the performance of event sequence analyses for the repository preclosure period. The evolving design of the repository will be re-evaluated periodically to ensure that internal hazards that have not been previously evaluated are identified

  8. 75 FR 46938 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-04

    ... Logistics LLC (NVO), 120 S. Woodland Blvd., 216, DeLand, FL 32720, Officers: Dietmar Lutte, Manager Member, (Qualifying Individual), Susan Lutte, Member, Application Type: New NVO License. Bridgeline Logistics..., (Qualifying Individual), Application Type: New OFF License. [[Page 46939

  9. 76 FR 49462 - Newfound Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License...

    Science.gov (United States)

    2011-08-10

    ... Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On July 25, 2011, Newfound Hydroelectric Company (transferor) and KTZ Hydro, LLC (transferee) filed an application for transfer of license for the Newfound Hydroelectric Project...

  10. 75 FR 72824 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-26

    ... & OFF License. Everglory Logistics, Inc. (NVO & OFF), 440 McClellan Highway, 105F2, East Boston, MA..., Application Type: New NVO & OFF License. Hawaii Intermodal Tank Transport, LLC (NVO & OFF), 2350 S. Dock... Tran, Manager, Application Type: New NVO & OFF License. ITL USA Inc. dba International Transport...

  11. 75 FR 80499 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-12-22

    ... Individual), Jeffrey Cullen, President. Application Type: QI Change. Cala Distribution, LLC (NVO), 2705 NW..., (Qualifying Individual), William S. Askew, Manager. Application Type: New NVO License. Encar Trading, Corp...

  12. 78 FR 20106 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-04-03

    ... M. Tsai, President (QI). Application Type: New NVO License. American International Shipping Company... Type: New NVO License. Nippon Concept America, LLC (OFF), 2203 Timberloch Place, Suite 218D, The...

  13. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-11-22

    ... Hydroelectric Corp.; Notice of Application for Amendment of License, and Soliciting Comments, Motions To Intervene, and Protests November 12, 2010. Take notice that the following hydroelectric application has been... Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on...

  14. 77 FR 59193 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-09-26

    ... Type: New OFF License. Bring Logistics US, Inc. (NVO & OFF), 4500 N. Sam Houston Parkway W., 130...: New NVO & OFF License. Contract Logistics, LLC (NVO & OFF), 4911 N. Portland Avenue, Suite 200.... Roush, Manager, Application Type: New NVO & OFF License. Crescent Line Inc. dba Globe Express Services...

  15. 76 FR 70145 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-11-10

    ...). Application Type: New NVO License. Alomar Transport, Inc. (NVO & OFF), 150-30 132nd Avenue, Suite 303, Jamaica... & OFF License. Forward System Logistics Inc. (NVO), 144-54 156th Street, Jamaica, NY 11434. Officers... NVO License. Green Line Shipping & Logistics Services Inc. (NVO & OFF), 16230 Lake View Lane, Apple...

  16. Application of up-front licensing

    International Nuclear Information System (INIS)

    Grant, S.D.; Snell, V.G.

    1995-01-01

    AECL has been pioneering 'up-front' licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs

  17. Application of up-front licensing

    Energy Technology Data Exchange (ETDEWEB)

    Grant, S D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada); Snell, V G [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    AECL has been pioneering `up-front` licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs.

  18. 75 FR 20997 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-04-22

    ... 77354. Officers: Thomas C. Gaze, President, Qualifying Individual). Lori L. Gaze, Secretary/Treasurer... Services, (Qualifying Individual). George T. Cook, President/Treasurer, Application Type: New OFF License...

  19. 25 CFR 141.9 - Application for license renewal.

    Science.gov (United States)

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES BUSINESS PRACTICES ON... the applicant has made as a reservation business owner and the applicant's present fitness to reside... pending consideration of application for license renewal. (c) Prior to expiration of the existing license...

  20. 77 FR 20398 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-04-04

    ...), Svi Soudai, Manager, Application Type: New OFF License. Armada USA, LLC dba Armada Logistics (NVO... Logistics (NVO & OFF), 435 Division Street, Elizabeth, NJ 07076, Officer: Carlos E. Feliu, President.../Treasurer, (Qualifying Individual), Application Type: New NVO License. HYC Logistics, Inc. (NVO & OFF), 2600...

  1. 76 FR 44330 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-07-25

    .... Nguyen, Secretary/CFO, Application Type: New NVO & OFF License. Atlas Logistics LLC (NVO & OFF), 2801 NW...), Application Type: New NVO & OFF License. Bulk Cargo Services & Logistics Inc. (OFF), 15400 N.E. 103rd Drive..., Member/Chief Executive Manager, (Qualifying Individual), Stina Storr, Member/ Managing Member...

  2. 77 FR 24712 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-25

    ... Global Logistics LLC (OFF), 9816 Whithorn Drive, Suite B, Houston, TX 77095, Officer: Herbert R. Hogg, Operating Manager (Qualifying Individual), Application Type: New OFF License. Toyo Logistics America, Inc... Individual), Application Type: New NVO License. Choiceone Logistics, Inc. (NVO & OFF), 10025 NW 116th Way, 17...

  3. 78 FR 66713 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-06

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . Action One Logistics, Inc..., Operating Manager (QI), Joseph Lam, Member, Application Type: New NVO License. Altex US, LLC (NVO & OFF), 1... President, Application Type: New NVO & OFF License. Andes Logistics USA LLC (NVO & OFF) 7500 NW 25 Street, 7...

  4. 76 FR 79682 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-12-22

    ... at (202) 523-5843 or by email at [email protected] . A.C.T. Logistics, LLC (NVO), 154-09 146th Avenue, 3rd...-President/Secretary. Application Type: License Transfer. Canyon Global Logistics, LLC (NVO & OFF), 2928-B..., General Manager, (Qualifying Individual), Oleg Ardachev, President. Application Type: New OFF License...

  5. 75 FR 61757 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-10-06

    ...), Jinho Um, CFO. Application Type: New NVO & OFF License. Junction Int'l Logistics, Inc. (NVO), 17870 Castleton Street, Suite 107, City of Industry, CA 91748. Officers: Charles Kuo, Secretary (Qualifying.... Application Type: New NVO & OFF License. Red Arrow Consulting, Inc. dba Red Arrow Logistics (OFF), 14925 SE...

  6. 76 FR 30360 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-05-25

    .... Application Type: Trade Name Change. B&O Logistics, Inc. (NVO), 19310 Pacific Gateway Drive, Torrance, CA.... Application Type: New NVO License. Charity Cargo L.L.C. (NVO & OFF), 1423 Kaleilani Street, Pearl City, HI... License. GreenLine Trade, LLC dba GreenLine Logistics (OFF), 14205 SE 36th, Suite 100, Bellevue, WA 98006...

  7. 77 FR 71002 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-11-28

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . 5G Logistics Solutions LLC..., President. Application Type: New NVO & OFF License. Bennett International Transport, L.L.C. (NVO & OFF.... Castano, COO. Application Type: New NVO & OFF License. James J. Boyle & Co. dba JJB Global Logistics Co...

  8. 78 FR 6325 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-01-30

    .... Application Type: New NVO & OFF License. Naca Logistics (USA), Inc. dba Brennan International Transport, dba...). Application Type: New NVO & OFF License. Miami Freight & Logistics Services, Inc. (NVO & OFF), 3630 NW 76th... World Shipping, dba OWS, dba Ocean Express, dba Oceanexpress Vanguard Logistics Services, dba Vanguard...

  9. Preparing to review the license application of the French geological disposal facility - Issues, challenges and perspectives

    International Nuclear Information System (INIS)

    Dandrieux, Geraldine

    2014-01-01

    This paper briefly describes the French context for GDR authorization, the French dedicated legislative framework (28 June 2006 Act on sustainable management of radioactive materials and waste), the challenges (regulatory issues, long-term project supervision, technical issues, procedural issues), and the preparing for the review of the DGR license application. A planning schedule is propose with Andra to submit license application for DGR in 2015

  10. 77 FR 12830 - Pershing County Water Conservation District; Notice of Intent To File License Application, Filing...

    Science.gov (United States)

    2012-03-02

    ... Water Conservation District; Notice of Intent To File License Application, Filing of Pre-Application.... Submitted by: Pershing County Water Conservation District (Pershing County). e. Name of Project: Humboldt... the Commission's regulations. h. Potential Applicant Contact: Bennie Hodges, Pershing County Water...

  11. License - Budding yeast cDNA sequencing project | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Budding yeast cDNA sequencing project License to Use This Database Last updated : 2010/02/15 You may use this databas...ional License described below. The Standard License specifies the license terms regarding the use of this database... and the requirements you must follow in using this database. The Additiona...n the Standard License. Standard License The Standard License for this database is the license specified in ...the Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database

  12. 77 FR 34030 - BOST1 Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-06-08

    ... Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and.... Date Filed: March 21, 2012. d. Submitted By: BOST1 Hydroelectric LLC (BOST1). e. Name of Project: Coon Rapids Dam Hydroelectric Project. f. Location: Mississippi River in Hennepin and Anoka counties...

  13. NUCLEAR SAFETY DESIGN BASES FOR LICENSE APPLICATION

    International Nuclear Information System (INIS)

    Garrett, R.J.

    2005-01-01

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111 [DIRS 156605] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113 [DIRS 156605] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period

  14. Nuclear Safety Design Base for License Application

    International Nuclear Information System (INIS)

    R.J. Garrett

    2005-01-01

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111(b) [DIRS 173273] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113(b) and (c) [DIRS 173273] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period

  15. Use of annotated outlines to prepare guidance for license applications for the MRS and MGDS

    International Nuclear Information System (INIS)

    Roberts, J.; Griffin, W.R.

    1992-01-01

    This paper reports that the Office of Civilian Radioactive Waste Management (OCRWM) has embarked on an aggressive program to develop guidance for preparation of the License Applications for the Mined Geological Disposal System (MGDS) and Monitored Retrievable Storage (MRS). The endeavor is a team effort that will utilize personnel and funding from the Office of Systems and Compliance at DOE Headquarters, the MRS Project (i.e., DOE Office of Storage and Transportation) and the Yucca Mountain Project (i.e., DOE Office of Geologic Disposal). The endeavor was initiated in the Spring of 1991. It will continue via an iterative process until License Applications are completed for the MRS and MGDS projects

  16. 75 FR 48686 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-11

    ...: New NVO License. Maritime and Intermodal Logistics Systems, Inc. dba MILS dba Fesco Integrated..., Senior Vice President/General Manager (Qualifying Individual), Kenryo Senda, President/CEO, Application...: New NVO & OFF License. Rado International, Inc. dba Rado Logistics (NVO & OFF), 2251 Sylvan Road...

  17. 77 FR 18815 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-28

    ... NVO License. American Patriot Lines, Inc. dba Tier One Logistics (NVO), 8616 La Tijera Boulevard, 401..., AL 36608. Officer: Samford T. Myers, Manager (Qualifying Individual). Application Type: New NVO & OFF License. Bluesea Logistics Corporation (NVO), 327 Elizabeth Avenue, Apt. A, Monterey Park, CA 91755-2044...

  18. 15 CFR 748.9 - Support documents for license applications.

    Science.gov (United States)

    2010-01-01

    ... licensing action, since end-uses and other considerations are important factors in the decision making... promptly notifying BIS of any change in the facts contained in the support document that comes to your attention. (h) Effect on license application review. BIS reserves the right in all respects to determine to...

  19. 77 FR 43599 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-07-25

    ... OFF License. Logistics International Parcel Shipping Transport LLC (NVO), 182 West Melrose Avenue, 2... Schwartz, Director, Application Type: New OFF License. Brox Logistics USA, LLC (NVO,) 244 5th Avenue, V-280... Agency Corporation, dba C&F Worldwide Logistics. Cargois Inc. dba Star Vision Logis (NVO), 2700 Coyle...

  20. 76 FR 28778 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-05-18

    ... Individual), Application Type: New NVO & OFF License. Asian Link Logistics, LLC dba Best Global (NVO & OFF... Type: New NVO License. Hansa Meyer Global Transport USA, LLC dba Hansa Shipping LLC, (OFF), 712 Main... & Logistics (Private) Limited dba, Nashrah Shipping and Logistics (NVO), Mezzanine Floor, Trade Ave., Tower 1...

  1. Environmental impact studies of projects be licensed under the Atomic Law

    International Nuclear Information System (INIS)

    Heuel-Fabianek, Burkhard; Lennartz, Reinhard

    2009-01-01

    The German Law on Environmental Impact Assessment (UVPG) defines projects to be licensed under the Atomic Law that require an environmental impact study (EIS). Since the project concepts as defined in the UVPG are often not the same as those defined in the Atomic Law (AtG), the licensing authority has to decide which project should be subjected to an EIA. Additionally, Article 37 of the EURATOM Treaty obliges every Member State to communicate certain data relating to the impact of emissions of radioactive substances to the Commission. This is independent of the EIA. A licence may only be granted by the competent authorities if an opinion has been received from the Commission pursuant to Article 37. In either case, the licensing authority is the first point of contact for the applicant if the question arises of whether a project has to be subjected to an EIA. A ''voluntary'' EIA should be regarded with caution because of the complexity of such a procedure within the licensing process requiring considerable resources of time and manpower, and the danger of a loss of credibility of the EIA. (orig.)

  2. 78 FR 64493 - Juneau Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft...

    Science.gov (United States)

    2013-10-29

    ... Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft Preliminary Draft... Hydropower, Inc. e. Name of Project: Sweetheart Lake Hydroelectric Project. f. Location: At the confluence of..., Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, email: duff...

  3. 75 FR 61474 - Juneau Hydropower, Inc.; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2010-10-05

    ... Hydropower, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and....: 13563-001. c. Dated Filed: July 28, 2010. d. Submitted By: Juneau Hydropower, Inc. e. Name of Project... Commission's regulations. h. Potential Applicant Contact: Duff W. Mitchell, Juneau Hydropower, Inc., P.O. Box...

  4. Fort Calhoun Station, Unit 2. License application, PSAR, general information

    International Nuclear Information System (INIS)

    1975-09-01

    Application for construction and operating licenses for Calhoun-2 Reactor is presented. Financial data concerning the Omaha Public Power District and the Nebraska Public Power District are included. (DCC)

  5. 76 FR 47182 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-08-04

    ... Street, Tampa, FL 33619, Officers: Margara L. Barillas, President (Qualifying Individual), Danihel I. Barillas, Secretary, Application Type: New NVO License. Russell A. Farrow (U.S.) Inc. (OFF & NVO), 4950...

  6. 77 FR 72863 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-12-06

    ... & D Transport, Inc. (NVO & OFF), 4869 Peavey Drive, Meridian, MS 39301. Officers: Uros Pejanovic, Vice... Nucete, Director. Application Type: New NVO & OFF License. Embarque Los Hidalgos LLC (NVO & OFF), 326...

  7. 77 FR 12583 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-01

    ... Hermo, Vice President, Application Type: New NVO & OFF License. B2B Global Logistics Incorporated (NVO... Change. Global Logistics New Jersey Limited Liability Company (NVO & OFF) 275 Veterans Boulevard...

  8. 77 FR 64991 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-10-24

    ..., Manager/Member. Application Type: New NVO & OFF License. Hospitality Logistics International LLC (NVO...), 11690 NW. 105th Street, Law 4W, Miami, FL 33178. Officers: Chris Merritt, Vice President (QI), John H...

  9. 77 FR 26008 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-05-02

    .... Forth-Matthews, President, Application Type: New OFF License. Azimuth Lines Inc. (OFF), 111 Ivy Lane.... (NVO), 1000 Lakes Drive, 260, West Covina, CA 91760, Officers: Larry Lee, Treasurer (Qualifying...

  10. 75 FR 67973 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-04

    ... Individual), Joy V. Pareckattil, President/Director, Application Type: New NVO License. CJC Logistics Limited Liability Company dba CJC Container Line (NVO & OFF), 186 Alps Road, Wayne, NJ 07470. Officers: Oliver Rosca...

  11. 76 FR 78007 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-12-15

    ..., (Qualifying Individual), Ruba Hindi, Member, Application Type: New OFF License. Kemka USA Limited Liability Company (NVO & OFF), 421 Lucy Court, South Plainfield, NJ 07080, Officer: Hsiang (Rita) Y. Hsiao, Member...

  12. 77 FR 70162 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-11-23

    ...), 900 Center Park Drive, Suite F, Charlotte, NC 28217, Officers: Paul L. Carter, Vice President (QI...), Application Type: New NVO License. Transport Partner (USA), Inc. (NVO & OFF), 2006 Cherry Hill Lane...

  13. 78 FR 38336 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-06-26

    ..., President (QI), Stephen B. Schwark, Treasurer, Application Type: License Transfer to EFL Container Lines...., Suite K, Mobile, AL 36609, Officers: Thomas (Mac) H. McPhillips IV, Assistant Vice President (QI), Oscar...

  14. 76 FR 23598 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-04-27

    ... Angeles, CA 90045, Officers: Ann L. Shang, CFO (Qualifying Individual), Yon L. Li, President, Application... Type: New NVO & OFF License. PME Logistics, Inc. (NVO), 19401 S. Main Street, Suite 102, Gardena, CA...

  15. 76 FR 56759 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-09-14

    ...), Ariel S. Villamayor, Limited Partner, Application Type: New OFF License. UTi, United States, Inc. dba UTi (NVO & OFF), 1660 Walt Whitman Road, Melville, NY 11747. Officers: Charles N. Deller, Vice...

  16. Status report on the HFR conversion and re-licensing project

    International Nuclear Information System (INIS)

    Wijtsma, F.G.

    2003-01-01

    In 1999 the HFR license holder (JRC, Petten, the Netherlands) initiated a project to study the conversion of the HFR from HEU to LEU. The first phase of this project consisted of a parametric study to determine the optimum fuel element and control rod design within given boundary conditions such as geometry, density, performance and cycle length. Results of this study are a 22 plates fuel element (550 g 235 U) at a density of 4.8 g.cm -3 and a 17 plates control rod (440 g 235 U). The second phase contains all aspects related to the conversion including a full-scale test irradiation of a prototype LEU element. The actual conversion of the HFR requires a new license. For this reason the re-licensing project has started in 2001. In this context many studies have been performed e.g. Risk Scoping Study, Safety Analyses, TOPA (Technical, Operational, Personnel and Administrative) evaluation. The license application will be based on a new Safety Report and an Environmental Impact Statement and will be submitted to the competent Authorities at the end of October 2003. (author)

  17. License application approach for the California LLRW disposal facility

    International Nuclear Information System (INIS)

    Gaynor, R.K.; Romano, S.A.; Hanrahan, T.P.

    1990-01-01

    US Ecology, Inc. is the State of California's license designee to site, develop and operate a low-level radioactive waste (LLRW) disposal facility to serve member states of the Southwestern Compact. US Ecology identified a proposed site in the Ward Valley of southeastern California in March 1988. Following proposed site selection, US Ecology undertook studies required to prepare a license application. US Ecology's license application for this desert site was deemed complete for detailed regulatory review by the California Department of Health Services (DHS) in December 1989. By mutual agreement, disposal of mixed waste is not proposed pending the State of California's decision on appropriate management of this small LLRW subset

  18. License Application Design Selection Report, REV 01. August 1999

    International Nuclear Information System (INIS)

    Hastings, C.R.

    1999-01-01

    In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value as elements of a repository design. In Phase II

  19. Total System Performance Assessment-License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  20. Total System Performance Assessment - License Application Methods and Approach

    International Nuclear Information System (INIS)

    McNeish, J.

    2003-01-01

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document

  1. 10 CFR 781.62 - Contents of a license application.

    Science.gov (United States)

    2010-01-01

    ... royalty fees or other consideration, if any, that the applicant would be willing to pay the Government for... application. An application for a license under a DOE invention must be accompanied by a processing fee of $25... towards royalty if royalties are charged, and must include the following information: (a) Identification...

  2. 78 FR 17205 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-20

    .... Sicilia, Member, Application Type: New NVO & OFF License. Brookfield Relocation Inc. (OFF), Two Corporate... Schwartz, President, Application Type: QI Change. Covenant Global Logistics Inc (NVO & OFF), 440 Benmar..., President, Application Type: Add Trade Name CGL Shipping. EXL Logistics, Inc. (NVO), 1444 NW 82nd Avenue...

  3. 78 FR 75345 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-12-11

    .... Romero, President (QI). Application Type: New NVO & OFF License. F.H.L. Logistics, Inc. (NVO & OFF), 1354.... Officers: Arif H. Butt, General Manager (QI), Unni Krishnan Nair, President. Application Type: New NVO...: Stephen F. Crooks, Vice President (QI), Scott Kelly, President. Application Type: Adding NVO Service...

  4. 76 FR 22104 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-04-20

    ...), Application Type: Business Structure Change Foothills Logistics, Inc. (NVO), 2045 John Crosland Jr. Way... Individual), Daniel Gelpi, President, Application Type: Add NVO Service ADM Logistics, Inc. (NVO & OFF), 4666... (Qualifying Individual), Application Type: New NVO & OFF License ATC Logistics, Inc. (NVO & OFF), 14350...

  5. 78 FR 50054 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-16

    ...), Ross V. Stemmler, President, Application Type: QI Change. Dawson Logistics, Inc. (OFF), 2220 South... (QI), Chad Earwood, President, Application Type: Add NVO Service. Fesco Integrated Transport North...), Ugochukwu O. Ene, President, Application Type: New NVO & OFF License. Icon Logistics Services LLC (OFF...

  6. 77 FR 6552 - Mahoning Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-02-08

    ... Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and...: December 7, 2011. d. Submitted By: Mahoning Hydropower, LLC. e. Name of Project: Berlin Lake Hydroelectric... Hydropower, LLC, 11365 Normandy Lane, Chagrin Falls, OH 44023; (440) 804-6627; [email protected] i. FERC...

  7. ACR-1000TM Project - Licensing Opportunities and Challenges

    International Nuclear Information System (INIS)

    Popov, N.; Doerffer, S.; Ion, R.; Hopwood, J.

    2011-01-01

    Atomic Energy of Canada Limited (AECL) has developed the Advanced CANDU Reactor TM 1 1000 (ACR-1000 TM ) as an evolutionary advancement of the current CANDU 6 reactor. The ACR-1000 design has evolved from AECL's in-depth knowledge of CANDU TM systems, components, and materials, as well as the experience and feedback received from owners and operators of CANDU plants. The ACR design retains the proven strengths and features of CANDU reactors, while incorporating innovations and state-of-the-art technology. It also features major improvements in economics, inherent safety characteristics, and performance, while retaining the proven benefits of the CANDU family of nuclear power plants. To ensure that the ACR design is compliant with Canadian and international requirements, regulatory pre-project reviews of the ACR-1000 (and ACR-700 TM 1 with lower output) were conducted early in the design work. The regulatory feedback from these pre-project regulatory reviews helped AECL to better understand regulatory expectations in Canada, US and the UK, and to make further advancements and improvements in the ACR design to meet the Canadian and international regulatory requirements. This paper provides an overview of the key design features of the ACR-1000 reactor design, and summary of the pre-project reviews by those above-mentioned regulatory bodies, demonstrating opportunities and challenges in licensing process of and pointing to the importance of efficient vendor-regulator interaction. (author)

  8. 76 FR 63668 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Science.gov (United States)

    2011-10-13

    ..., Research and Test Reactors Projects Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor... NUCLEAR REGULATORY COMMISSION [NRC-2011-0135] Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim...

  9. 78 FR 55698 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-09-11

    ...), Karla Costilla, Member/Manager, Application Type: New NVO & OFF License. ICAT Logistics, Inc. (OFF..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . Abaco Logistics Corporation..., CFO, Application Type: QI Change & Add OFF Service. American General Logistics, Inc. (NVO), 626 N...

  10. 77 FR 37044 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-20

    ... 95695, Officer: Nasrullah Chaudhry, Member/Manager (Qualifying Individual), Application Type: Add NVO... (Qualifying Individual), Margaret Kong, CFO/Secretary, Application Type: New NVO & OFF License. FSG Logistics (USA), Inc. dba FSG Logistics, Inc. (NVO & OFF), 27013 Pacific Highway South, PMB386, Des Moines, WA...

  11. 78 FR 48435 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-08

    ... Change. Ever Line Logistics Inc. (NVO & OFF), 147-35 Farmers Blvd., Suite 208, Jamaica, NY 11434, Officer: Caihong Yang, President (QI), Application Type: Name Change to Bona Logistics US Inc. Global Container.... Bote, Member/Manager, Edgar T. Bote, Member/Manager, Application Type: New NVO License. National Air...

  12. 76 FR 55909 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-09-09

    ..., LLC dba AIM Global Logistics (NVO & OFF), 6402 Teluco Street, Houston, TX 77055, Officer: Angelica Garcia-Dunn, Manager/President/Treasurer (Qualifying Individual), Application Type: New OFF & NVO License... Individual), Application Type: Name Change. BestOcean Worldwide Logistics, Inc. (NVO & OFF), 1300 Valley...

  13. 78 FR 18592 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-27

    ...), Veronica Alcestte, Manager, Application Type: New NVO & OFF License Worldcraft Logistics LLC (NVO & OFF.... Salvat, Vice President, Application Type: Add NVO Service Bayshore Logistics & Services, LLC (NVO & OFF), 909 Westfield Avenue, Elizabeth, NJ 07208, Officers: Raquel Velez, Operating Manager (QI), Jose Moreno...

  14. 76 FR 62407 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-10-07

    ... & Product Logistics Manager (Qualifying Individual), Thomas B. Crowley, Director, Application Type: QI... at (202) 523-5843 or by e-mail at [email protected] . Alltransport International Logistics, Inc. (NVO), 63... Individual), Application Type: New NVO License. American Global Logistics LLC dba AGL (NVO & OFF), 3399...

  15. 78 FR 14792 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-07

    ...: Mohamed Y. Ali, Manager (QI); Abdul S. Mohamed, Member. Application Type: Add Trade Name Compass Logistics... Ugueto, Secretary. Application Type: New NVO & OFF License American Forwarding & Logistics, LLC (NVO & OFF), 1919 NW 19th Street, Unit 624, Ft. Lauderdale, FL 33311. Officers: Gabriele Awada, Manager (QI...

  16. 77 FR 45610 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-08-01

    ...), Richard A. Arkey, Vice President, Application Type: New NVO License. Aequus Worldwide Logistics Inc. (NVO..., Application Type: Name Change to Concepts in Freight, Inc. FGN Global Logistics, Inc. (NVO & OFF), 4770...), 341 Erickson Avenue, P.O. Box 124, Essington, PA 19029, Officers: Ari M. Bobrow, Export Manager...

  17. 10 CFR 81.40 - Contents of a license application.

    Science.gov (United States)

    2010-01-01

    ... categories: (i) Small business firm; (ii) Minority business enterprise; (iii) Location in a surplus labor... correspondence should be sent and any notices served; (4) Nature and type of applicant's business; (5...; (6) Purpose for which the license is desired, and a brief description of applicant's plan to achieve...

  18. 77 FR 40882 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-07-11

    ..., Director, Application Type: License Transfer & QI Change. Gulf Premier Logistics LLC (NVO & OFF), 340 N... & OFF), 1163 Fairway Drive, 106, City of Industry, CA 91789, Officer: XiuJi Zhang, President, (Qualifying Individual), Application Type: Add NVO Service. Simple Logistics Inc. (NVO), 147-35 Farmers...

  19. 77 FR 38288 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-27

    ..., President. Application Type: QI Change. Freight Logistics Services USA Forwarding Ltd (OFF), 15955 W. Hardy... Individual). Application Type: Add OFF Service. Pudong Prime Int'l Logistics, Inc. (NVO), 9660 Flair Drive... License. Benchmark Worldwide Logistics, Inc. dba Star Ocean Lines (NVO & OFF), 24900 South Route 53...

  20. 78 FR 48870 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-12

    ...: Tufan Duygun, Manager (QI), Ozisik Serhat, Member, Application Type: Add Trade Name Daimon Logistics USA. Logistics International Parcel Shipping Transport LLC (NVO), 391 Kent Avenue, Elk Grove, IL 60007, Officers...), Application Type: NVO & OFF License. Kesco Logistics, Inc. (NVO & OFF), 20 E. Sunrise Highway, Suite 308...

  1. 75 FR 57798 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-09-22

    ..., (Qualifying Individual). Application Type: New NVO & OFF License. Cambria Global Logistics, LLC (OFF), 12140...). Application Type: QI Change. K&K Express, LLC dba K2 Logistics (NVO & OFF), 2980 Commers Drive, 100, Eagan, MN... Global Transport (NVO), 8636 York Circle, La Palma, CA 90623. Officer: Smile Cha, Sole Proprietor...

  2. 76 FR 67730 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-02

    ..., President, Application Type: Name Change/Trade Name Change Lion Transport, Inc. dba Amex Logistics (NVO... Individual), Caetano R. Lopes, Vice President, Application Type: Add NVO Service Eztrans Logistics Ltd. (NVO... Type: New OFF License LF Freight USA LLC dba LF Logistics dba LF Freight dba IDS Logistics USA, dba IDS...

  3. 77 FR 30530 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-05-23

    ... Individual), Application Type: New NVO License. Global Wine Logistics, Inc. (NVO & OFF), 197 Route 19 South... Hextall, President/CEO, Application Type: Add NVO Service/Trade Name Change. M & D Global Logistics, Inc... Service. Metro Freight Services, Inc. dba Maritime Express Lines (M.E.L.) (NVO & OFF), 1225 W. St. George...

  4. 47 CFR 80.53 - Application for a portable ship station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.53 Application for a portable ship station license. The Commission may grant a license permitting operation of a...

  5. Resolving the issues arisen during the development of License Renewal Application at PAKS NPP

    International Nuclear Information System (INIS)

    Ratkai, Sandor; Katona, Tamas Janos

    2012-01-01

    Operational license of the four VVER-440/213 units at Paks NPP, Hungary is limited to the design lifetime of 30 years. Extension by an additional 20 years of the original license is one of the main goals of the plant owner. In 2008 a programme for long-term operation (LTO) was developed and submitted to the Hungarian Atomic Energy Authority. The LTO Programme defines the activities for ensuring the extension of the operational lifetime and contains the justification of the safe LTO. The LTO Programme has to be implemented and comprehensive justification of the safe LTO has to be provided in the formal License Renewal Applications unit by unit. This work has been completed by the end of 2011, and the application has been submitted for approval for the Unit 1. The authority review and the approval of the License Renewal Application for Unit 1 should be finished before the expiration of the original design lifetime in 2012. In line with the regulations and supporting the License Renewal Application, a large number of engineering tasks have been performed. In this paper the entire project will be reported. The issues will be discussed, which have been arisen during the development of the application. The difficulties caused by the Hungarian technical and regulatory peculiarities will be presented. (author)

  6. Capital Projects Application (CPA)

    Data.gov (United States)

    General Services Administration — Capital Projects application (CPA) provides users with the ability to maintain project related financial data for Budget Activity (BA) 51, 55, 64, 01, 02, 03, 04....

  7. 77 FR 58370 - Pennamaquan Tidal Power LLC; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2012-09-20

    ... Tidal Power LLC; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD... Filed: July 19, 2012. d. Submitted By: Pennamaquan Tidal Power LLC (Pennamaquan Power). e. Name of Project: Pennamaquan Tidal Power Plant Project. f. Location: On the Pennamaquan River at the entrance to...

  8. 76 FR 6135 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-02-03

    ... Lawin Cargo dba, Bahaghari Express Cargo (NVO), 761 Highland Place, San Dimas, CA 91773, Officer..., Application Type: New NVO License. Four Points Ocean Inc. (NVO & OFF), 1460 Route 9 North, Suite 303.... Grannell, President/CEO (Qualifying Individual), Michael Kuhn, Vice President, Sales & Marketing...

  9. Fuel Receiving and Storage Station. License application, amendment 4

    International Nuclear Information System (INIS)

    1975-04-01

    Amendment No. 4 of the application for licensing the Barnwell Fuel Processing Plant is presented. Information is included on: the quantity and characteristics of nuclear fuel assemblies which can be received and stored; specifications limiting the outside washdown of contaminated casks received for unloading; and definition of environmental monitoring program. (U.S.)

  10. 78 FR 35634 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-06-13

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . China Interocean Transport.... Taleon, Sole Proprietor (QI). Application Type: New NVO & OFF License. Dulce Auto Import & Export, Inc...), Parque de Granada No. 71, P.H. 504, Huixquilucan, Estado de Mexico 52785 Mexico. Officers: Moises S. Leon...

  11. 76 FR 3636 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-01-20

    ..., Vice President, Application Type: New NVO & OFF License. CDS Global Logistics, Inc. (NVO & OFF), 1001... & Logistics LLC (NVO & OFF), Hoboken Business Center, 50 Harrison Street, Suite 204B, Hoboken, NJ 07030, Officers: Michelle L. Hasenauer, Manager (Qualifying Individual), Harbans S. Shrinkant, Manager...

  12. 76 FR 41258 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-07-13

    ... Individual), Gediminas Garmus, Member/Manager. Application Type: New OFF License. World Logistics USA, Inc... at (202) 523-5843 or by e-mail at [email protected] . 3 Plus Logistics Co. dba Touchdown Freight Co. (NVO... Logistics, Inc. (NVO), 3120 Via Mondo, Rancho Dominguez, CA 90220. Officer: Simon Hwang, President/CEO...

  13. 75 FR 35815 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-06-23

    ..., TX 76011. Officers: Omar Kolaghassi, Manager (Qualifying Individual), Laura Alicia, Manager. Application Type: New OFF & NVO License. CALS Logistics USA, Inc. (OFF & NVO), 755 North Route 83, Suite 215.... Premium Star Logistics LLC dba O.P. Premium Star Logistics (OFF & NVO), 4200 Lightning Court, Bakersfield...

  14. 77 FR 74186 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-12-13

    ... Logistics, Inc. (NVO & OFF), 7685 NW. 80th Terrace, Medley, FL 33166, Officers: Hugo E. Martinez, Secretary... & OFF), 1834 Harden Blvd., Lakeland, FL 33803, Officers: Steven C. Pniewski, Manager (QI), Manuel R. Echevarria, President, Application Type: New NVO & OFF License, Global Wide Logistics, Inc. (NVO), 1937 Davis...

  15. 78 FR 43202 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-07-19

    .... Alsea Global Logistics, LLC dba Alsea Global Logistics (NVO & OFF), 4836 SE Powell Blvd., Portland, OR... NVO & OFF License. Atlant Consulting Inc. dba Avro Logistics (NVO & OFF), 3626 Geary Blvd., Suite 206..., Officers: Paul Selvage, Member (QI), Steven Periman, Member/Manager, Application Type: Add Trade Name Blu...

  16. 76 FR 14395 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-03-16

    ..., Manager/President. Application Type: QI Change. Geoffrey Au dba ABC Logistics Company (NVO), 2250 Gellert... at (202) 523-5843 or by e-mail at [email protected] . Arkman Logistics Inc. (NVO), 1001 Fargo Avenue, Elk... Type: New NVO & OFF License. BCargo Logistics, S.A. de C.V. (NVO), Av. Revolucion 725-A, Col. Jardin...

  17. 75 FR 29545 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-05-26

    .... Atlantic Cargo Logistics LLC (OFF & NVO), 120 South Woodland Blvd., 216, Deland, FL 32720. Officers: Dietmar Lutte, Manager, (Qualifying Individual) Susan Lutte, Member, Application Type: New OFF & NVO License. Direct Delivery Logistics and Supply, LLC (OFF & NVO) 2006 Wilson Road, Humble, TX 77396...

  18. 77 FR 35384 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-13

    ... Logistics LLC (NVO), 9814 Goldenglade Drive, Houston, TX 77064, Officer: Sandra Lesage, Member/Manager... telephone at (202) 523-5843 or by email at [email protected] . ABC Trucking and Logistics L.L.C. (OFF), 3080...), Lawrence R. Lammers, President/CEO, Application Type: License Transfer Atlantic Cargo Logistics LLC (NVO...

  19. 9 CFR 2.11 - Denial of initial license application.

    Science.gov (United States)

    2010-01-01

    ... have violated any Federal, State, or local laws or regulations pertaining to animal cruelty within 1... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Denial of initial license application. 2.11 Section 2.11 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT...

  20. 76 FR 7209 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-02-09

    ... 77032. Officer: Walter Krauklis, OTI Compliance Officer (Qualifying Individual), Thomas B. Crowley, Jr... Road, Suite 14, Newtown Square, PA 19073. Officer: Thomas D. Torcomian, CEO/ Member (Qualifying...). Application Type: New OFF License. Solomon Emeke dba Desaiah Limited (OFF), 3696 Park Avenue, 300, Ellicott...

  1. 76 FR 38651 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-07-01

    ... Shipping (NVO), 1861 Western Way, Torrance, CA 90501. Officers: Hseanrus (Stephen) H. Lin, President/Vice..., President, Application Type: New NVO & OFF License. F.H.L. Logistics, Inc. (NVO & OFF), 1354 NW 78th Avenue..., Gardena, CA 90248. Officers: Anna W. Liu, Vice President (Operations), (Qualifying Individual), Quincy H...

  2. 76 FR 33757 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-06-09

    ... NVO & OFF License. The Ultimate Logistics Service Corporation (NVO & OFF), 3 Birch Place, Pine Brook... Logistics, Corp. (NVO), 4713 Deeboyar, Lakewood, CA 90712. Officer: Tan Sek, Pres/VP/Sec/Treasurer...), Application Type: Add OFF Service. Oceanic Link USA LLC (NVO & OFF), 5430 Jimmy Carter Blvd., Suite 216...

  3. 77 FR 13604 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-07

    ... A. Rincon, Manager (Qualifying Individuals), Application Type: Business Structure Change. De Well... Type: New NVO License. King Solomon Logistics Inc. (NVO), 135-14 Liberty Avenue, South [[Page 13605... Logistics Inc. (NVO), 167-16 146th Avenue, Suite 203, Jamaica, NY 11434, Officer: Yau Fung Ling, President...

  4. 78 FR 60282 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-10-01

    ...) pursuant to section 19 of the Shipping Act of 1984 (46 U.S.C. 40101). Notice is also given of the filing of... Castleton Street, Suite 105, City of Industry, CA 91748, Officers: Ya Liu, Deputy General Manager (QI), Jian C. Feng, Director, Application Type: New NVO License, By the Commission. Dated: September 27, 2013...

  5. 77 FR 39707 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-07-05

    ..., Application Type: New OFF License. Best Global Logistics USA, Inc dba Siam Intercargo Services (NVO & OFF... International Transport, LLC (NVO), 6048 Lido Lane, Long Beach, CA 90803, Officer: Charles Brennan, Member...: Add NVO Service. Sinai Logistics LLC (NVO & OFF), 11419 NW. 112th Street, Medley, FL 33178, Officer...

  6. 76 FR 16420 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-03-23

    ...), Andrew P. Bottomley, Managing Partner, Application Type: QI Change and Add OFF Service. All Transport... Type: New NVO & OFF License. Andrea Bigi dba AB Global Logistics Consulting (OFF), 1010 19th Street, 10.... Officers: Joanne Kirkpatrick, International Logistics Officer (Qualifying Individual), Jack R. Lentz, CEO...

  7. 76 FR 65193 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-10-20

    ... at (202) 523-5843 or by e-mail at [email protected] . AB Global Logistics Consulting Inc. (OFF), 1010 19th..., Application Type: New NVO License. All Transport Export Inc (NVO & OFF), 4224 Shackleford Road, 3, Norcross... Type: Name Change. CR & J Logistics, Inc. (OFF), 8401 Lake Worth Road, Lake Worth, FL 33467. Officers...

  8. Total System Performance Assessment - License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  9. Public participation in the licensing of large-scale projects with environmental impact

    International Nuclear Information System (INIS)

    1989-01-01

    As a rule, public participation in licensing and planning procedures for large-scale projects with environmental impact is as controversial as the projects themselves. Against this background, an interdisciplinary examination of several 'cases' of public participation in administrative procedures with varying legal forms is being conducted in a joint research project run by the Department for Applied Systems Analysis (Karlsruher Nuclear Centre) and the Research Institute for Public Administration at the College for Administrative Sciences in Speyer. The actual course of events and the practical experience of the groups involved (authorities, applicants, objectors, experts) are related to the applicable legal arrangements for public participation. The question to be answered is: which expected and unexpected functions do the procedures actually fulfill and which not. Proposals for the amendment of legal policy could be developed upon the foundation of such a diagnosis. The report contains the results of the 'pilot study' on public participation in the licensing of the nuclear power plant GKN-2 in Neckarwestheim and further contributions on the issue of 'public participation', presented within the framework of a research colloquium at the School for Nuclear Technology/Karlsruhe Nuclear Research Centre. (orig.) [de

  10. Application of coupled codes for safety analysis and licensing issues

    International Nuclear Information System (INIS)

    Langenbuch, S.; Velkov, K.

    2006-01-01

    An overview is given on the development and the advantages of coupled codes which integrate 3D neutron kinetics into thermal-hydraulic system codes. The work performed within GRS by coupling the thermal-hydraulic system code ATHLET and the 3D neutronics code QUABOX/CUBBOX is described as an example. The application of the coupled codes as best-estimate simulation tools for safety analysis is discussed. Some examples from German licensing practices are given which demonstrate how the improved analytical methods of coupled codes have contributed to solve licensing issues related to optimized and more economical use of fuel. (authors)

  11. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1993-11-01

    This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards

  12. Licensing Status of New and Expanding In-Situ Recovery Uranium Projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Catchpole, G.; Thomas, M., E-mail: gccatchpole@uranerz.com [Uranerz Energy Corporation (URZ), Casper, WY (United States)

    2014-05-15

    The authors investigated the licensing status of new in-situ recovery (“ISR”) uranium projects, as well as the expansion of existing projects, within the United States (“US”). Specific emphasis and analysis is placed on those projects within the states of Texas and Wyoming. Of note, information used to prepare this paper was obtained from public sources that included company web sites, the US Securities and Exchange Commission, the US Nuclear Regulatory Commission (“NRC”), the US Energy Information Agency (“EIA”), and the relevant state regulatory agencies. The renewed interest in the production of natural uranium has been motivated, in part, by the increased sale price of yellowcake beginning around 2003 resulting in numerous new and existing natural resources companies acquiring mineral rights in the United States. Because of the economic favorability in terms of both operating and capital costs of ISR mines versus conventional mines in the US (with its relatively low grade of uranium ore), the model for most companies was to acquire mineral properties that had the potential for being mined using the ISR method. There were, however, exceptions to this model. The Uravan mineral district in southwest Colorado and southeast Utah, where relatively high-grade, shallow uranium deposits have the potential to be mined using underground methods, is one such exception. However, the focus of this paper will be on ISR projects. In Wyoming, which has been the top producer of natural uranium among the 50 states for the past seven years, there is one producing ISR mine (Bill Smith — Highland), one ISR mine on standby (Christensen Ranch), and two ISR uranium projects licensed but not yet built (Gas Hills and North Butte). Cameco Resources is planning to develop two ISR projects in Wyoming that have been licensed but not yet constructed. Additionally, three new uranium companies (Ur-Energy, Uranerz and Uranium One) have filed applications with the federal and

  13. Fuel Receiving and Storage Station. License application, amendment 7

    International Nuclear Information System (INIS)

    1976-02-01

    Amendment No. 7 to Allied-General Nuclear Services application for licensing of the Fuel Receiving and Storage Station consists of revised pages for: Amendment No. 7 to AG-L 105, ''Technical Description in Support of Application for FRSS Operation''; Amendment No. 1 to AG-L 105A, ''Early Operation of the Service Concentrator''; and Amendment No. 2 to AG-L 110, ''FRSS Summary Preoperational Report.''

  14. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z., E-mail: jonatasfmata@yahoo.com.br, E-mail: vasconv@cdtn.br, E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  15. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    International Nuclear Information System (INIS)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z.

    2015-01-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  16. 77 FR 23241 - Lock+ Hydro Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2012-04-18

    ... Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 20, 2012. d. Submitted By: Lock+ Hydro Friends Fund XXX, LLC. e. Name of Project... Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XXX, c/o Hydro Green Energy, LLC, 900...

  17. 21 CFR 515.20 - Approval of medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Approval of medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.20 Approval of medicated feed mill license applications. Within 90 days after an...

  18. 21 CFR 515.21 - Refusal to approve a medicated feed mill license application.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Refusal to approve a medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.21 Refusal to approve a medicated feed mill license application. (a) The...

  19. 78 FR 61984 - Copper Valley Electric Association, Inc.; Notice of Application To Amend License and Accepted for...

    Science.gov (United States)

    2013-10-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13124-005] Copper Valley...: Amendment to License. b. Project No: 13124-005. c. Date Filed: September 27, 2013. d. Applicant: Copper..., Copper Valley Electric Association, Inc., P.O. Box 45, Mile 187 Glenn Highway, Glennallen, AK 99588, (907...

  20. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Science.gov (United States)

    2013-06-20

    ... Environmental Reports for Nuclear Power Plant License Renewal Applications AGENCY: Nuclear Regulatory Commission... for Nuclear Power Plant License Renewal Applications.'' This regulatory guide provides guidance to... renewal of a nuclear power plant operating license. Applicants should use this regulatory guide when...

  1. 47 CFR 87.47 - Application for a portable aircraft station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable aircraft station... SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.47 Application for a portable aircraft station license. A person may apply for a portable aircraft radio station license if the need...

  2. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    International Nuclear Information System (INIS)

    Kostova, M.; Howard, D.; Elder, P.

    2013-01-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  3. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    Energy Technology Data Exchange (ETDEWEB)

    Kostova, M.; Howard, D.; Elder, P. [Directorate of Nuclear Cycle and Facilities Regulation, Canadian Nuclear Safety Commission, 280, Slater Street, Ottawa, Ontario K1P 5S9 (Canada)

    2013-07-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  4. Legal aspects of public participation in the planning/licensing of environmentally related large-scale projects

    International Nuclear Information System (INIS)

    Kurz, A.

    1991-01-01

    A variety of legal problems arise in the planning/licensing of environmentally related large-scale projects associated with the control and evaluation of technical conditions and the ramifications in social and legal policy of the acceptance of, and resistance to, such projects. On the basis of a number of partial studies e.g. of the licensing procedure of a nuclear power plant (Neckar-2 reactor) the author examines the legal aspects of public participation in the administrative procedures of licensing/plans approval. The dichotomy of law and technology is covered, and public participation in administrative procedures is derived legally from the basic constitutional rights and the principle of fair hearing. After an outline of specific administrative procedures, public participation as part of administrative procedures is included in the broad legal framework of licensing/plans approval of environmentally related large-scale projects. The author concludes that public participation, within the framework of the basic decisions established by legislature, is not a tool to be used in deciding basic political conflicts. Instead, public participations in the application of law serves to protect the rights of the individual by ensuring fair proceedings paying attention to the subjective rights of the individual. As it is unable to decide political conflicts, it is also an unsuitable means of establishing of basic societal consensus, or of seeking acceptance of large-scale projects. (orig./HP) [de

  5. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  6. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1991-04-01

    The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC [Nuclear Regulatory Commission] licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor

  7. 18 CFR 16.10 - Information to be provided by an applicant for new license: Filing requirements.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL POWER ACT PROCEDURES RELATING TO TAKEOVER AND RELICENSING OF LICENSED PROJECTS Applications for... redistribution of power flows on line loading (with respect to applicable thermal, voltage, or stability limits... governmental agencies and subdivisions likely to be interested in or affected by the proposed expansion. (11...

  8. 75 FR 51451 - Erie Boulevard Hydropower, L.P.; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2010-08-20

    ... Hydropower, L.P.; Notice of Intent To File License Application, Filing of Pre-Application Document, and.... Project No.: 7320-040. c. Dated Filed: June 29, 2010. d. Submitted By: Erie Boulevard Hydropower, L.P. e...: John Mudre at (202) 502-8902; or e-mail at [email protected] . j. Erie Boulevard Hydropower, L.P...

  9. NPP long term operation in Spain - First application for license renewal

    International Nuclear Information System (INIS)

    Francia, L.; Gorrochategui, I.; Marcos, R.

    2007-01-01

    Full text: In the operation of the Spanish nuclear power plants (NPP), safety is always the prime consideration. Plant Life Management Programmes have been set up with the strategic objective to operate the NPPs as long as they are considered safe and reliable. The safety of each NPP is reviewed by the Spanish nuclear regulatory authority (CSN) under a continuous process. In addition, experience is gained from operating the plants and from exchanges with operators of similar units. Current Spanish regulatory framework for renewing NPP operating licenses requires performing a Periodic Safety Review (PSR) to be performed every 10 years and submitted when applying for a new renewal of the NPP operating license. A few years ago, CSN issued a document regarding the licensing requirements that nuclear power plants should meet in order to be granted with an operating license for long term operation (i.e, operation beyond the original plant design life, typically 40 years). Besides the traditional PSR requirements, specific requirements regarding to long term operation (LTO) include: - An Aging Management and Evaluation Program, including the identification and evaluation of Time Limited Aging Analysis (TLAA). - An updated Radiological Impact Study. - A review and assessment of regulation/standard applicability. Garona NPP (GE, BWR/3 design) operated by Spanish utility Nuclenor from 1971 has a current operating license up to 2009. A decision was made to apply for a new operating license, being Garona plant the first one in Spain to face with the new long term operation requirements. The paper will provide an overview of the methodology used in Spain to address and perform the required analyses to support the LTO application for the operating license renewal. In particular, focus will be paid on the project developed in Garona (2002-2006) whose result has been the first Spanish application for License Renewal for LTO. Also it will be reported the ongoing work necessary to

  10. 76 FR 65544 - Standard Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities

    Science.gov (United States)

    2011-10-21

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0323] Standard Format and Content of License Applications... revision to regulatory guide (RG) 3.39, ``Standard Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities.'' This guide endorses the standard format and content for license...

  11. 21 CFR 515.11 - Supplemental medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Supplemental medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.11 Supplemental medicated feed mill license applications. (a) After approval of a medicated feed...

  12. Technical Specifications, South Texas Project, Unit No. 1 (Docket No. 50-498): Appendix ''A'' to License No. NPF-76

    International Nuclear Information System (INIS)

    1988-03-01

    The South Texas Project, Unit No. 1, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR 50 for the protection of the health and safety of the public. This report is Appendix A to License No. NPF-76

  13. License Application Design Selection Feature Report: Aging and Blending

    International Nuclear Information System (INIS)

    Coltoni, B.; Anderson, M.J.

    1999-01-01

    The purpose of this document is to evaluate the concepts of Aging and Blending for waste sent to the Monitored Geologic Repository (MGR). These design features are based on pre-emplacement treatment of the waste stream. The envelope of the analysis has been performed under the direction of the License Application Design Selection Team (LADST), which advocated utilizing the Viability Assessment (VA) repository design (DOE 1998c) as the basis. Therefore, this evaluation attempts to modify the VA design only to the extent that Aging and Blending can be accomplished. This modified VA design will be contrasted to the VA Design and the difference in design, costs, and performance will be presented

  14. 21 CFR 515.25 - Revocation of order refusing to approve a medicated feed mill license application or suspending...

    Science.gov (United States)

    2010-04-01

    ... medicated feed mill license application or suspending or revoking a license. 515.25 Section 515.25 Food and..., FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.25 Revocation of order refusing to approve a medicated feed mill license application or suspending or revoking a...

  15. The regulatory review of construction license application and the supporting safety case

    International Nuclear Information System (INIS)

    Heinonen, Jussi

    2014-01-01

    Finland is one of the foremost countries in the world in developing the disposal of spent fuel. The construction license application for the Olkiluoto spent fuel disposal facility was submitted to the authorities at the end of 2012 and the facility is expected to start operation around 2020. This has been a long-term project with over 30 years of parallel development of the repository project and the regulatory approach to spent fuel management. In 1983 the government made a strategic decision on the objectives and target time schedule for the research, development and technical planning of nuclear waste management. While an export and international disposal solution was still the preferred option, this decision required the licensees without this possibility to prepare for disposal in Finland and it also gave the time line for the milestones on the way to an operating disposal facility by 2020. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act and Decree (1987, 1988). These licensing steps are: - Decision-in-principle is required for a nuclear facility having considerable general significance. This is essentially a political decision: the government decides if the construction project is in line with the overall good of society. The decision can be applied for one or more sites, the host municipality has a veto right and the parliament has the choice of ratifying or not ratifying the decision. - Construction license is granted by the government and authorises the construction of the disposal facility. The actual construction is regulated by STUK and includes several review and approval steps, hold points and viewpoints. - Operational license is granted by the government and authorises the operation of the facility for a certain period. The operational license is needed before nuclear waste can be disposed. The first step in the licensing process was reached

  16. 78 FR 21930 - Aquenergy Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2013-04-12

    ... Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License...: November 11, 2012. d. Submitted by: Aquenergy Systems, Inc., a fully owned subsidiaries of Enel Green Power...

  17. 75 FR 28250 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-05-20

    ... Type: Add NVO Service and QI Change. Best Container Express, Inc. (NVO), 17238 S. Main Street, Gardena...). Peixin Li, President. Application Type: Add OFF Services. Project Rail, LLC dba Vectora Transportation...

  18. Application and licensing requirements of the Framatome ANP RLBLOCA methodology

    International Nuclear Information System (INIS)

    Martin, R.P.; Dunn, B.M.

    2004-01-01

    The Framatome ANP Realistic Large-Break LOCA methodology (FANP RLBLOCA) is an analysis approach approved by the US NRC for supporting the licensing basis of 3- and 4-loop Westinghouse PWRs and CE 2x4 PWRs. It was developed consistent with the NRC's Code Scaling, Applicability, and Uncertainty (CSAU) methodology for performing best-estimate large-break LOCAs. The CSAU methodology consists of three key elements with the second and third element addressing uncertainty identification and application. Unique to the CSAU methodology is the use of engineering judgment and the Process Identification and Ranking Table (PIRT) defined in the first element to lay the groundwork for achieving the ultimate goal of quantifying the total uncertainty in predicted measures of interest associated with the large-break LOCA. It is the PIRT that not only directs the methodology development, but also directs the methodology review. While the FANP RLBLOCA methodology was generically approved, a plant-specific application is customized in two ways addressing how the unique plant characterization 1) is translated to code input and 2) relates to the unique methodology licensing requirements. Related to the former, plants are required by 10 CFR 50.36 to define a technical specification limiting condition for operation based on the following criteria: 1. Installed instrumentation that is used in the control room to detect, and indicate, a significant abnormal degradation of the reactor coolant pressure boundary. 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a

  19. 78 FR 30914 - Grand River Dam Authority Notice of Application for Temporary Variance of License and Soliciting...

    Science.gov (United States)

    2013-05-23

    .... Description of Request: Grand River Dam Authority (GRDA) requests a temporary variance, for the year 2013, to... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-416] Grand River Dam Authority Notice of Application for Temporary Variance of License and Soliciting Comments, Motions To...

  20. 78 FR 4467 - UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3...

    Science.gov (United States)

    2013-01-22

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 52-016; NRC-2008-0250] UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3, Exemption 1.0 Background UniStar Nuclear Energy (UNE), on behalf of Calvert Cliffs Nuclear Project, LLC and UniStar Nuclear Operating Services...

  1. 75 FR 69063 - Port Bailey Wild Enterprises, LLC; PB Energy, Inc.; Notice of Application for Transfer of License...

    Science.gov (United States)

    2010-11-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1432-010] Port Bailey Wild... Motions To Intervene November 3, 2010. On October 22, 2010, Port Bailey Wild Enterprises, LLC (transferor) and PB Energy, Inc. (transferee) filed a joint application for transfer of license for the Dry Spruce...

  2. 78 FR 14528 - Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and...

    Science.gov (United States)

    2013-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11169-029] Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On November 20, 2012, Mayo Hydropower, LLC (transferor) and Avalon Hydropower...

  3. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  4. EC6 design features and pre-project licensing review

    Energy Technology Data Exchange (ETDEWEB)

    Yu, S.; Lee, A.G.; Dinh, N.B.; Soulard, M. [CANDU Energy Inc., Mississauga, Ontario, (Canada)

    2013-07-01

    The Enhanced CANDU 6 (EC6) is the new Generation III CANDU reactor design that meets the most up to date Canadian regulatory requirements and customer expectations. Candu Energy Inc. is finalizing development of the EC6 which incorporates the CANDU 6's well-proven features, and adds enhancements that strengthened reactor safety margin and improved operability. The EC6 builds on the proven high performance design and the defence-in-depth features of CANDU 6 units, and has incorporated extensive operational feedback including lessons learned from Fukushima. This paper will provide status of the engineering program including progress on the pre-licensing review of the EC6 design by the Canadian Regulator, CNSC, and will also highlight the design and safety enhancements incorporated in the EC6 product. Safety enhancements to meet safety goals and to improve robustness of systems to respond to design basis accidents and beyond design basis accidents include: new severe accident recovery and heat removal system; improved emergency heat removal system; faster shutoff rods with improved safety margins; mechanical guaranteed shutdown rods; daily load cycling capability; robust containment with containment filter venting system; and improved backed-up electrical supply and cooling services. (author)

  5. Legal aspects of public participation in the planning/licensing of environmentally related large-scale projects

    International Nuclear Information System (INIS)

    Kurz, A.

    1992-02-01

    A variety of legal problems arise in the planning/licensing of environmentally related large-scale projects associated with the control and evaluation of technical conditions and the ramifications in social and legal policy of the acceptance of, and resistance to, such projects. On the basis of a number of partial studies e.g. of the licensing procedure of a nuclear power plant (Neckar-2 reactor), the author examines the legal aspects of public participation in the administrative procedure of licensing/plans approval. The dichotomy of law and technology is covered, and public participation in administrative procedures is derived legally from the basic constitutional rights and the principle of fair hearing. After an outline of specific administrative procedures, public participation as part of administrative procedures is included in the broad legal framework of licensing/plans approval of environmentally related large-scale projects. The author concludes that public participation, within the framework of the basic decisions established by legislature, is not a tool to be used in deciding basic political conflicts. Instead, public participations in the application of law serves to protect the rights of the individual by ensuring fair proceedings paying attention to the subjective rights of the individual. As it is unable to decide political conflicts, it is also an unsuitable means of establishing of basic societal consensus, or of seeking acceptance of large-scale projects. This is reflected also in studies of the legal functions of public participation, according to which the lawfulness of procedures is observed without, however, the legitimacy of the project being achieved. (orig./HP) [de

  6. Nursing Manpower Licensed in Kentucky, 1979-1981. Kentucky Nursing Education Project.

    Science.gov (United States)

    Kentucky State Council on Higher Education, Frankfort.

    Data on nurses licensed in Kentucky for 1979-1981 are presented, as part of the Kentucky Nursing Education Project. Information is provided on: licensure status, home state/district/county, employment status, employment state/district/county, field of employment in nursing, position, highest educational level attained, age, sex, marital status,…

  7. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...

  8. 77 FR 70837 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-27

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... request: The proposed change will delete Function 14, SG [Steam Generator] Water Level--Low, Coincident... capability to shut down the reactor when required on Low--Low Steam Generator water level. The ability to...

  9. 78 FR 16876 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-19

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... proposes to replace the VHS with an onsite diesel generator as the AAC power source providing this... power source (the VHS) with an additional onsite AAC power source (diesel generator). This equipment can...

  10. 77 FR 63343 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-10-16

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... for an inoperable diesel generator (DG). A commensurate change is also proposed to extend the maximum... alternating current power source (i.e., a supplemental diesel generator) with the capability to power any E...

  11. 77 FR 73684 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-12-11

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... emergency diesel generator, and the stored lube oil inventory will also continue to require that a 7-day supply be available for each diesel generator. The changes are consistent with NRC-approved Technical...

  12. 77 FR 67679 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-13

    ... diesel generator surveillance requirements. Margin of safety is related to the ability of the fission... evaluated; or (3) involve a significant reduction in a margin of safety. The basis for this proposed... accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2...

  13. 78 FR 14126 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-04

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... of the document. The E-Filing system also distributes an email notice that provides access to the... Completion Time has no impact on the consequences of any design basis accident since the consequences of an...

  14. Licensing aspects of the NPP Temelin IandC replacement project

    International Nuclear Information System (INIS)

    Karpeta, C.

    1997-01-01

    The objections raised against the original design of the instrumentation and control system of the Temelin nuclear power plant are summarized. The nuclear regulatory environment of the Czech Republic is described; the activities of the State Office for Nuclear Safety (SONS) are highlighted. The requirements underlying the licensing of the Temelin IandC replacement project are discussed in some detail. The licensing process adopted by SONS is to a certain degree computer-aided. A database has been developed by SONS; the three-layer structure of the database is described. (A.K.)

  15. 76 FR 72984 - Revised Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2011-11-28

    ... NUCLEAR REGULATORY COMMISSION Revised Application for a License To Export High-Enriched Uranium The application for a license to export high-enriched Uranium has been revised as noted below. Notice... fabricate fuel France. Security Complex; October 18, Uranium (93.35%). uranium (174.0 elements in France...

  16. 76 FR 59173 - Standard Format and Content of License Applications for Conventional Uranium Mills

    Science.gov (United States)

    2011-09-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2008-0302] Standard Format and Content of License Applications for Conventional Uranium Mills AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide..., ``Standard Format and Content of License Applications for Conventional Uranium Mills.'' DG- 3024 was a...

  17. 75 FR 70350 - Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application

    Science.gov (United States)

    2010-11-17

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration [USCG-2010-0993] Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application AGENCY: Maritime Administration... announce they have received an application for the licensing of a natural gas deepwater port and the...

  18. SKB's safety case for a final repository license application

    International Nuclear Information System (INIS)

    Hedin, Allan; Andersson, Johan

    2014-01-01

    The safety assessment SR-Site is a main component in SKB's license application, submitted in March 2011, to construct and operate a final repository for spent nuclear fuel at Forsmark in the municipality of Oesthammar, Sweden. Its role in the application is to demonstrate long-term safety for a repository at Forsmark. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. The principal regulatory acceptance criterion, issued by the Swedish Radiation Safety Authority (SSM), requires that the annual risk of harmful effects after closure not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. SSM's regulations also imply that the assessment time for a repository of this type is one million years after closure. The licence applied for is one in a stepwise series of permits, each requiring a safety report. The next step concerns a permit to start excavation of the repository and requires a preliminary safety assessment report (PSAR) covering both operational and post-closure safety. Later steps include permission to commence trial operation, to commence regular operation and to close the final repository. (authors)

  19. 75 FR 69080 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-10

    ... license as a Non-Vessel-Operating Common Carrier (NVO), and/or Ocean Freight Forwarder (OFF)--Ocean..., Building 14-A, Kenner, LA 70062, Officers: Gary J. Cheramie, President (Qualifying Individual), George...: License Transfer. Total Global Solutions, Inc. (NVO & OFF), 4290 Bells Ferry Road 224, Suite 106, Kennesaw...

  20. 78 FR 32650 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-05-31

    ... Change Abaco Logistics Corporation (OFF), 8051 NW 67th Street, Miami, FL 33166, Officers: Manuel T. Soto...: New NVO & OFF License Star Cluster Logistics (NVO & OFF), 4 Executive Circle, Suite 170, Irvine, CA... License Straight Forwarding, Inc. (NVO & OFF), 20974 Currier Road, City of Industry, CA 91789, Officer: Yi...

  1. Project Portfolio Management Applications Testing

    OpenAIRE

    Paul POCATILU

    2006-01-01

    Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  2. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  3. 77 FR 21592 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Science.gov (United States)

    2012-04-10

    ... Licensing of Non-Power Reactors: Format and Content,'' for the production of radioisotopes and NUREG-1537, Part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors... by searching on http://www.regulations.gov under Docket ID NRC-2011-0135. You may submit comments by...

  4. Licensing process for future applications of advanced-design nuclear reactors

    International Nuclear Information System (INIS)

    Miller, C.L.

    1990-01-01

    The existing 10CFR50 two-step licensing process in the Code of Federal Regulations can continue to be a viable licensing vehicle for future applications, at least for the near future. The US Nuclear Regulatory Commission (NRC) Commissioners and staff, the public, and the utilities (along with supporting architect/engineers and nuclear steam supply system vendors) have a vast body of experience and knowledge of the existing part 50 licensing process. All these participants are familiar with their respective roles in this process, and history shows this process to be a workable licensing vehicle. Nevertheless, the use of 10CFR52 should be encouraged for future applications. This proposed new rule is intended to achieve the early resolution of licensing issues, to reduce the complexity and uncertainty of the licensing process, and enhance the safety and reliability of nuclear power plants. Part 52's overall purpose is to improve reactor safety and streamline the licensing process by encouraging the use of standard reactor designs and by allowing the early resolution of site environmental and reactor safety issues. The public should be afforded an earlier entry into the licensing process as a result of design certification rulemaking process and combined construction permit/operating license hearings

  5. Project 2019 of Garona Nuclear power plant. First project to licensing renew more than 40 years in Spain

    International Nuclear Information System (INIS)

    Fernandez, R. A.; Torralbo, J. R.

    2004-01-01

    NUCLENOR has been developing lifetime management and modernisation activities at Santa Maria de Garona NPP since the end of the 80's and the plant is now in optimum technical conditions to continue in operation beyond its original lifetime planned in the design (40 years). In the USA, the country of origin of the project, a good number of power plants with a similar design, age and history to SMG are in the process of obtaining or have already obtained, a licensing extension of up to 60 years from the NRC. In Spain, the activities required for requesting a long-term operating licensing extension include the Ageing Assessment and Management of the plant systems, structures and components, in accordance with the american regulation 10CFR54, a Radiological Impact Study for the new operating period, and an Analysis of New Legislation, not included in the licensing bases and considered to be important to safety by the CSN. With a view to obtaining a renewal of the current operating permit for the period 2009-2019, NUCLENOR has launched the Proyecto 2019, which extends to technical and licensing aspects, as it involves all the company's personnel. (Author)

  6. 78 FR 69852 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-21

    .... dba Freight Team dba iGlobal US (NVO & OFF), 15930 Valley Boulevard, City of Industry, CA 91744.... Amexlog Corporation dba Amex Logistics Corp (NVO & OFF), 1970 NW 70th Avenue, Miami, FL 33126. Officers... License. Canfleet Logistics Ltd. (NVO), 1408-700 West Pender Street, Vancouver, B.C. V6C 1G8. Officers...

  7. 76 FR 72409 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-23

    ... NVO Service. Pink City Logistics USA LLC (NVO & OFF), 7 Emily Road, Manalapan, NJ 07726; Officers... at (202) 523-5843 or by email at [email protected] . AE Eagle Logistics Inc. (NVO & OFF), 765 Route 83... License. Daybreak Logistics, Inc. (NVO & OFF), 2804 N. Cannon Blvd., Kannapolis, NC 28083; Officers...

  8. 77 FR 3773 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-01-25

    .... Hartwig Gdynia dba C. Hartwig Transport (NVO), 7, Derdowskiego Street, 81-369 Gdynia, Poland. Officers...: New OFF License. Cheryl G. Wilson dba JC Logistics (NVO & OFF), 28612 Redondo Beach Drive South, Des...: Add NVO Service. CR & J Logistics, Inc. dba Brightwater Shipping Services (NVO & OFF), 8401 Lake Worth...

  9. Use of limited information in a license application to construct a repository

    International Nuclear Information System (INIS)

    McGarry, J.M. III; Echols, F.S.

    1996-01-01

    The purpose of this paper is to provide a rationale for the proposition that the Department of Energy's (DOE's) submittal of a license application (LA) for the construction of a geologic repository to the Nuclear Regulatory Commission (NRC) may be, and arguably must be, based on statutorily-limited site characterization data and design information. The Nuclear Waste Policy Act of 1982 (NWPA), as amended, is the controlling statute for the disposal of spent nuclear fuel in a licensed geologic repository. Applicable NRC regulations for the licensing of such a repository are found for the most part in 10 C.F.R. Part 60

  10. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    International Nuclear Information System (INIS)

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act

  11. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    International Nuclear Information System (INIS)

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination

  12. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  13. 77 FR 74841 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-12-18

    ... patrons who access the restaurant by boat. l. Locations of the Application: A copy of the application is... Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is...

  14. Generic licensing issues applicable to Wolsong 3 and 4 licensing review

    International Nuclear Information System (INIS)

    Boyd, Frederick C.

    1994-01-01

    The Wolsong 3 and 4 nuclear power plants are of CANDU type which were designed according to the rules and regulations of the Atomic Energy Control Board (AECB) of Canada. In 1992 AECB staff issued a first formal report (to the AECB Board) on 'generic safety issues affecting power reactors'. This was followed by a second report in 1993. These reports dealt with safety issues associated with Canadian CANDU nuclear power plants that applied to all or several plants and were considered insufficiently resolved. In most cases the concern was lack of certainty in the related safety analyses. The AECB staff report of 1993 identified eight 'generic action items' and six 'long-term research issues', three of which AECB staff have indicated may be moved into the 'action' category. This report, prepared for the Korea Institute of Nuclear Safety (KINS), reviews the background of the AECB 'generic action items' and the three 'long-term research issues' noted above. It also reviews an additional topic - steam line failure outside of containment - which was included in the request from KINS. In all, twelve issues are covered. These background reviews are followed by a discussion of the relevance of each issue to the licensing review (for Construction Permit) of Wolsong 3 and 4 and recommended actions to be taken by KINS

  15. 78 FR 73566 - Standard Format and Content for a License Application for an Independent Spent Fuel Storage...

    Science.gov (United States)

    2013-12-06

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0264] Standard Format and Content for a License...), DG-3042, ``Standard Format and Content for a License Application for an Independent Spent Fuel..., Form, and Contents,'' specifies the information that must be in an application for a license to store...

  16. 77 FR 33243 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Science.gov (United States)

    2012-06-05

    ... expansion process, thermal expansion mismatch between the tube and tubesheet, and from the differential... NUCLEAR REGULATORY COMMISSION [NRC-2012-0125] Applications and Amendments to Facility Operating...

  17. Other best-estimate code and methodology applications in addition to licensing

    International Nuclear Information System (INIS)

    Tanarro, A.

    1999-01-01

    Along with their applications for licensing purposes, best-estimate thermalhydraulic codes allow for a wide scope of additional uses and applications, in which as realistic and realizable results as possible are necessary. Although many of these applications have been successfully developed nowadays, the use of best-estimate codes for applications other than those associated to licensing processes is not so well known among the nuclear community. This issue shows some of these applications, briefly describing their more significant and specific features. (Author)

  18. 78 FR 19746 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-04-02

    ... cases to mail copies on electronic storage media. Participants may not submit paper copies of their... consequences of the offsite dose and control room dose projections for the currently approved design basis FHA... [American Society of Mechanical Engineers Boiler and Pressure Vessel Code], Section XI, Appendix G edition...

  19. Preparing to Submit a License Application for Yucca Mountain

    International Nuclear Information System (INIS)

    W.J. Arthur; M.D. Voegele

    2005-01-01

    In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region

  20. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  1. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    International Nuclear Information System (INIS)

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination

  2. Application of IC Card License for Road Transportation in Commercial Vehicles Supervision and Service

    Directory of Open Access Journals (Sweden)

    Li Weiwei

    2016-01-01

    Full Text Available IC card electronic license for road transport includes the IC card commercial vehicle’s certificate and IC card practitioner’s qualification certificate. In China, the IC card electronic license for road transport is the electronic ID card which must be carried by each commercial vehicles and practitioners. This paper briefly introduces the basic situation, data format and security keys architecture of IC card electronic license for road transportation of China. In order to strengthen the supervision and service of commercial vehicles, this paper puts forward the overall application framework of IC card electronic license for road transport. The application examples of IC card license in the supervision of passenger station, dangerous goods transport management, governance overload and logistics park and port area management are discussed. The practical application results show that the application of IC card electronic license for road transport is an important technical means to improve the supervision ability and service quality of the road transportation industry.

  3. 78 FR 54280 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-09-03

    ... the Commission's ``Agency Rules of Practice and Procedure'' in 10 CFR part 2. Interested person(s...-Filing system also distributes an email notice that provides access to the document to the NRC's Office... clarify language in the LSCS, Units 1 and 2, Technical Specifications (TS) applicable to the design...

  4. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  5. The dispute over the social license for mining projects in La Rioja, Argentina

    Directory of Open Access Journals (Sweden)

    Mariana Sola Álvarez

    2013-11-01

    Full Text Available Since the beginning of this century, projects of transnational corporations design to extract -in a mega scale- gold, silver, copper, and molybdenum are back to interrogate Famatina Valley, located in the northwest of Argentina, in the province of La Rioja. The dispute that is generated around the "social license" of mining projects highlights features of policy matrix and local government backing for extractive activities. At the same time illustrates the content and the potentiality of social resistance. The power of veto from a network of neighbors assemblies and a highly mobilized community in critical moments of the conflict is framed in a process of resistance to mercantilization of commons that travels through Latin America.

  6. Safety case for license application for a final repository: The French example

    International Nuclear Information System (INIS)

    Boissier, Fabrice; Voinis, Sylvie

    2014-01-01

    The reversible repository in a deep geological formation is the French reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste (HLW and ILW). Twenty years of R and D work and conceptual and basic studies since the first French Act of 1991 led, in particular, to a feasibility demonstration in 2005. According to the French Act on Radioactive Waste of 28 of June 2006, Andra shall design a reversible repository in order to apply for license in 2015. In response to this demand, Andra developed the industrial project known as 'Cigeo', a reversible geological disposal facility for HLW and ILW located in Meuse/Haute-Marne. Two years before applying for authorisation, Andra's project is now focusing on three main targets: developing Cigeo's industrial design, preparing the authorisation process through increased exchanges with stakeholders and the preparation of a safety case to support authorisation application. The latter draws on the previous safety cases of 2005 and 2009, which give a sound basis to assess Cigeo's safety, both for the operational and post-closure periods. In this new stage of the project, the challenging issues for the preparation of the safety case are the following: - to identify the various regulatory frameworks (nuclear and non-nuclear) and guides applicable to the facility; - to ensure that the industrial design complies in particular with the safety requirements as presented in the safety case and its supporting safety assessment; - to identify crucial inputs (R and D, tests,...) needed to support the authorisation application, in particular, to bring convincing arguments to assess the technical feasibility of the design and when appropriate its ability to meet the safety requirements; - to ensure that all the requirements from previous regulatory and peer reviews (national and international?) are taken into account. (authors)

  7. 78 FR 13342 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-02-27

    .... Officers: Keith Phillips, Vice President (QI), Glenn Henderson, President. Application Type: New NVO & OFF.... Officers: Paul Pellitieri, President (QI), Virginia Pellitieri, Vice President. Application Type: New NVO...

  8. 75 FR 3217 - J&T Hydro Company; H. Dean Brooks and W. Bruce Cox; Notice of Application for Transfer of License...

    Science.gov (United States)

    2010-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11392-009] J&T Hydro Company; H. Dean Brooks and W. Bruce Cox; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene January 12, 2010. On October 30, 2009, J&T Hydro Company (transferor) and...

  9. 77 FR 73054 - Application for a License To Export Radioactive Waste

    Science.gov (United States)

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export Radioactive Waste Pursuant to 10 CFR 110.70(b) ``Public Notice of Receipt of an Application,'' please take notice that the Nuclear..., October 25, 2012, XW020, radioactive 1178 pounds disposal by the 11006061. waste in the (approximately...

  10. 77 FR 14445 - Application for a License To Export Steel Forging

    Science.gov (United States)

    2012-03-09

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export Steel Forging Pursuant to 10 CFR 110.70(b) ``Public Notice of Receipt of an Application,'' please take notice that the Nuclear... head steel February 7, 2012 forging. forging will be XR175 machined into the 11005983 finished vessel...

  11. 75 FR 15743 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-03-30

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public notice of receipt of an application,'' please take notice that the...-Enriched 160.0 kilograms To fabricate fuel France. Complex, March 3, 2010. Uranium (93.35%). uranium (149...

  12. 75 FR 6223 - Application For a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-02-08

    ... NUCLEAR REGULATORY COMMISSION Application For a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public notice of receipt of an application,'' please take notice that the..., Uranium (93.35%). uranium (16.3 targets for December 28, 2009, XSNM3623, kilograms U-235). irradiation in...

  13. 77 FR 1956 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-01-12

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(b) ``Public Notice of Receipt of an Application,'' please take notice that the.... Security Complex. Uranium uranium (9.3 targets at December 21, 2011 (93.35%). kilograms U- CERCA AREVA...

  14. 75 FR 7525 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-02-19

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public notice of receipt of an application,'' please take notice that the..., February 2, Uranium (93.35%). uranium (87.3 elements in 2010, February 2, 2010, kilograms U-235). France...

  15. 76 FR 4417 - Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application

    Science.gov (United States)

    2011-01-25

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration [USCG-2010-0993] Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application AGENCY: Maritime Administration... application describes an offshore natural gas deepwater port facility that would be located approximately 16.2...

  16. 77 FR 76483 - Ocean Transportation Intermediary License Applicants The Commission gives notice that the...

    Science.gov (United States)

    2012-12-28

    ... Transport Co., PAC International Logistics Company, & Book Express Network. Stealth Logistics LLC (NVO & OFF.... Application Type: QI Change. Efrinsa Global Logistics Inc. (NVO & OFF), 8441 NW 68th Street, Miami, FL 33166... (QI), Sheila E. Lawrence, President. Application Type: New OFF License. MMC Logistics, LLC (OFF), 2853...

  17. Federal/State cooperation in the licensing of a nuclear power project. A joint licensing process between the US Nuclear Regulatory Commission and the Washington State Energy Facility Site Evaluation Council

    International Nuclear Information System (INIS)

    1984-05-01

    This report summarizes and documents a joint environmental review and licensing process established between the US Nuclear Regulatory Commission (NRC) and the Washington State Energy Facility Site Evaluation Council (EFSEC) in 1980-1983 for the Skagit/Hanford Nuclear Project (S/HNP). It documents the agreements made between the agencies to prepare a joint environmental impact statement responsive to the requirements of the National Environmental Policy Act of 1969 (NEPA) and the Washington State Environmental Policy Act. These agreements also established protocol to conduct joint public evidentiary hearings on matters of mutual jurisdiction, thereby reducing the duplication of effort and increasing the efficiency of the use of resources of federal and state governments and other entities involved in the process. This report may provide guidance and rationale to licensing bodies that may wish to adopt some of the procedures discussed in the report in the event that they become involved in the licensing of a nuclear power plant project. The history of the S/HNP and of the agreement processes are discussed. Discussions are provided on implementing the joint review process. A separate section is included which presents independent evaluations of the process by the applicant, NRC, and EFSEC

  18. 78 FR 28845 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-05-16

    ..., President, Application Type: QI Change Contract Logistics, LLC (NVO), 4911 North Portland Avenue, Suite 200..., Application Type: Add Trade Name Smart Lines Worldwide Feiliks Global Logistics Corporation (NVO), 176-20 S..., Director, Application Type: QI Change Intermodal Tank Transport (USA), Inc. (NVO), 2537 S. Gessner, Suite...

  19. Information to be submitted in support of licensing applications for nuclear power plants

    International Nuclear Information System (INIS)

    1979-01-01

    This Safety Guide was prepared as part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It supplements the Agency's Safety Series No.50-C-G, entitled ''Governmental Organization for the Regulation of Nuclear Power Plants: A Code of Practice''. It is concerned with the content of documents which should be submitted to the regulatory body by the applicant/licensee in support of licensing applications, with a possible method of classifying these documents and with the scheduling of their submission to the regulatory body at each major stage of the licensing process

  20. 75 FR 32780 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-06-09

    .../Secretary, (Qualifying Individual), Bengt R. Anderson, President, Application Type: QI Change. Cargomar... Corp. (OFF & NVO), 6301 E. 10th Avenue, Hialeah, FL 33013, Officers: Marjorie E. Morales, Operation...

  1. 76 FR 19097 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-04-06

    ... Sachs, Partner/Logistics Manager (Qualifying Individual), Ali Ismailzada, Partner/CFO, Application Type... at (202) 523-5843 or by e-mail at [email protected] . Agility Logistics Corp. (OFF), 240 Commerce, Irvine... Avenue, Newark, NJ 07083, Officer: Hakeem K. Bisiolu, Member/Manager (Qualifying Individual), Application...

  2. 77 FR 23719 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-20

    ... Logistics, Inc. (NVO & OFF), 180 Champion Way, Northlake, IL 60164. Officers: David F. Gross, CEO (Qualifying Individual), Lance A. Lucibello, Vice President. Application Type: QI Change. CMA CGM Logistics... Fafoutis, General Manager (Qualifying Individual), Frank J. Baragona, Director. Application Type: New NVO...

  3. 75 FR 6398 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-02-09

    ... Forwarder Transportation Intermediary Applicants Best Way Logistics Corp., 901 SW. 98th Terrace, Pembroke..., Officers, Alessandro E. Bernardini, Sales Manager, (Qualifying Individual), Glenda Valdez, President... Intermediary Applicants (Cont'd): Vortex Worldwide Logistics Corp., 10125 NW. 116th Way, 10, Miami, FL 33178...

  4. 75 FR 66099 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-10-27

    ... Logistics, Inc. (NVO), 17890 Castleton Street, Suite 398, City of Industry, CA 91748, Officers: Jennifer X... (Qualifying Individual), Application Type: QI Change. Concert Group Logistics, Inc. (NVO & OFF), 1430 Branding... Individual), Daniel Para, CEO, Application Type: QI Change. De Well Logistics LLC dba De Well Logistics, dba...

  5. 75 FR 60124 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-09-29

    ... Individual), Sharlene Chesnes, EVP/COB/EVP/Secretary, Application Type: QI Change IAL Container Line (USA..., Vice President (Qualifying Individual), Arjun Menon, Director, Application Type: QI Change LTA Import & Export, Inc. (NVO & OFF), 14331 SW 120th Street, 203, Miami, FL 33186, Officers: Eric E. Diaz, Director...

  6. Outline for embedded topical license renewal industry perspective

    International Nuclear Information System (INIS)

    Gilchrist, Jacqueline

    1991-01-01

    This presentation describes the history of the project, selection of the Lead plant; project management, and project implementation, License renewal application contains: implementation plan; technical specifications and program changes; updated safety analysis report supplement; plant specific exemptions; environmental report update

  7. Licensing requirements for initial commissioning programs in Spain: Application to different PWR designs

    International Nuclear Information System (INIS)

    Munuera, A.; Conde, J.M.; Martinez, J.

    1991-01-01

    This paper describes the overall licensing process in Spain, focusing on the initial commissioning requirements. The significance of this part of the regulatory work is evident both from the licensing and the licensee's points of view. Licensing in Spain is ruled by different laws which determine the general requirements and fix the licensing frame. Being a nuclear technology importer country, the base of the regulatory work lies on the rules and regulations of the country of origin of the planet, with the addition of case specific requirements. The application of this methodology to plants designed in different countries produces licensing processes which are similar to the overall, but very different in its development. It also means a special technical effort on the part of the regulatory body to cope with the problems arising from the use of different technologies and safety standards. The start-up programs from fuel loading to full power of a Westinghouse plant (Vandellos 2) and a Siemens-KWU plant (Trillo 1) are compared from the technical point of view, enhancing the differences that can be relevant for the regulatory work. The difficulties arising from the application of both the German and US concepts are discussed. (orig.)

  8. Guide for the preparation of applications for licenses for the use of sealed sources in portable gauging devices

    International Nuclear Information System (INIS)

    1985-01-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the use of sealed sources in portable gauging devices. An example of a portable gauging device is a moisture-density gauge that contains a gamma-emitting sealed source, cesium-137, and a sealed neutron source, americium-242-beryllium

  9. 75 FR 52343 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-25

    ... Company, Inc. (NVO & OFF), 4529 Angeles Crest Highway, Suite 300, La Canada, CA 91011, Officers: Ernest V..., Application Type: QI Change. BestOcean Worldwide Logistics, Inc. (OFF & NVO), 1300 Valley Vista Drive, Suite...

  10. 76 FR 67188 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-10-31

    ... Liability Company, dba GlobalForwarding.com dba Forwardingservices.com dba Containerquote.com dba Global.../CEO/CFO, Application Type: QI Change. Unicorn Shipping, Inc. (NVO & OFF), 1225 W. 190th Street, Suite...

  11. 78 FR 30921 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-05-23

    .... (NVO & OFF), 2500 Wilcrest Drive, Suite 300, Houston, TX 77042, Officers: Myrian T. Morales, Vice..., FL 33178, Officer: Jose R. Gantus, President (QI), Application Type: QI Change XL Worldwide Corp...

  12. 76 FR 10593 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-02-25

    ... Individual), Steven L. Leturno, Director, Application Type: QI Change. Combined Freight System, Inc. (NVO...), 148-08 Guy R. Brewer Blvd., Jamaica, NY 11434, Officers: Wei Hu, Vice President, (Qualifying...

  13. 76 FR 71608 - Notice of Availability of Combined License Applications

    Science.gov (United States)

    2011-11-18

    ...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of..., email: Donald.Habib@nrc.gov . SUPPLEMENTARY INFORMATION: The following parties have filed applications...

  14. 76 FR 77021 - Notice of Availability of Combined License Applications

    Science.gov (United States)

    2011-12-09

    ...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of..., email: Donald.Habib@nrc.gov . SUPPLEMENTARY INFORMATION: The following parties have filed applications...

  15. 76 FR 72725 - Notice of Availability of Combined License Applications

    Science.gov (United States)

    2011-11-25

    ...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of..., email: Donald.Habib@nrc.gov . SUPPLEMENTARY INFORMATION: The following parties have filed applications...

  16. 78 FR 10173 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-02-13

    ... Road, Scituate, MA 02066, Officers: Stephen J. Zambo, Member (QI), Stephen A. Zambo, Member... 60007, Officers: Joshua H. Chau, President (QI), Bessie S. Chau, Secretary, Application Type: New NVO...

  17. 76 FR 12962 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-03-09

    ... L. Li, President, Application Type: QI Change. EP-Team, Inc. dba EP-Team (NVO & OFF), 3700 Forums... Maritime Services USA (NVO), 425 West Main Street, Alhambra, CA 91801. Officers: Hans P. Hofmann, Assistant...

  18. 77 FR 32115 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-05-31

    ... Individual), Lar D. Westerberg, CEO, Application Type: Add NVO Service. Jo-Sak Shipping USA, Inc. (NVO & OFF... Service. Waterline International Logistics, Inc. (NVO & OFF), 24178 Alicia Parkway, Mission Viejo, CA...

  19. Pesticide Applicator Profiling: Using Polycom[R] Distance Delivery for Continuing Education and Characterizing Florida's Licensed Applicators

    Science.gov (United States)

    Fishel, Fred; Langeland, Ken

    2011-01-01

    The University of Florida offers continuing education units (CEUs) via distance technology using Polycom[R] to meet requirements for applicators of pesticides to renew their licenses. A large statewide event conducted in 2010 also included a needs assessment of this group concerning CEUs. Results indicate that these applicators strongly prefer…

  20. 78 FR 45578 - Application For a License to Export Radioactive Waste

    Science.gov (United States)

    2013-07-29

    ... NUCLEAR REGULATORY COMMISSION Application For a License to Export Radioactive Waste Pursuant to 10..., 2013, radioactive waste authorized for disposal by the XW021, 11006101. as contaminated export will not original secondary waste exceed quantities generators, as resulting from imported in required or the...

  1. 77 FR 73056 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant... Complex. Uranium (93.2%). uranium-235 at CERCA AREVA Romans October 10, 2012 contained in 6.2 in France and to October 12, 2012 kilograms irradiate targets at XSNM3729 uranium. the BR-2 Research 11006053...

  2. 77 FR 73055 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant.... Security Complex. Uranium uranium-235 at CERCA AREVA October 10, 2012 (93.35%). contained in Romans in France October 12, 2012 10.1 kilograms and to irradiate XSNM3730 uranium. targets at the HFR 11006054...

  3. 77 FR 51579 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-08-24

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant.... Complex, July 30, 2012, August Uranium (93.35%). uranium-235 high-enriched 1, 2012, XSNM3726, 11006037. contained in 7.5 uranium in the kilograms uranium. form of broken metal to the Atomic Energy of Canada...

  4. 78 FR 33448 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2013-06-04

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant.... Security Complex, May 13, Uranium (93.35%). uranium-235 at the National 2013, May 21, 2013, XSNM3745, contained in 7.5 Research Universal 11006098. kilograms reactor in Canada for uranium. ultimate use in...

  5. 18 CFR 131.20 - Application for approval of transfer of license.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Application for approval of transfer of license. 131.20 Section 131.20 Conservation of Power and Water Resources FEDERAL... a citizen of the United States of America. Subscribed and sworn to before me, a notary public of the...

  6. 75 FR 467 - Notice of Opportunity for Hearing, License Application Request of Powertech (USA) Inc. Dewey...

    Science.gov (United States)

    2010-01-05

    ... Hearing, License Application Request of Powertech (USA) Inc. Dewey-Burdock In Situ Uranium Recovery... Regulatory Commission (NRC) for the Dewey-Burdock In Situ Recovery Facility in Fall River and Custer Counties, South Dakota. The Dewey-Burdock facility would involve the recovery of uranium by in situ recovery (ISR...

  7. Shirley Basin Uranium Mill. Environmental report to accompany source material license application

    International Nuclear Information System (INIS)

    1975-12-01

    This document summarizes all of the environmental monitoring conducted by Utah. This Environmental Report consequently supplements and updates the information presented in the Source Material License application of August 18, 1970 and the Final Environmental Statement (FES) of December 1974. Water and air quality, liquid waste management, soil/vegetation monitoring, and reclamation are covered

  8. Standard format and content of license applications for plutonium processing and fuel fabrication plants

    International Nuclear Information System (INIS)

    1976-01-01

    The standard format suggested for use in applications for licenses to possess and use special nuclear materials in Pu processing and fuel fabrication plants is presented. It covers general description of the plant, summary safety assessment, site characteristics, principal design criteria, plant design, process systems, waste confinement and management, radiation protection, accident safety analysis, conduct of operations, operating controls and limits, and quality assurance

  9. NEP Nuclear Power Plant, Units 1 and 2. License application, general and financial information

    International Nuclear Information System (INIS)

    1976-01-01

    A license application is presented for 2 pressurized water reactors at a proposed location in Charlestown RI. Each reactor will have a net capacity of 1150 MW. Cooling water will be supplied by the Atlantic Ocean. NEP-1 is scheduled for operation in 1983 and NEP-2 in 1985

  10. 78 FR 40519 - Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving...

    Science.gov (United States)

    2013-07-05

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-298; NRC-2013-0139] Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards..., issued to Nebraska Public Power District (the licensee), for operation of the Cooper Nuclear Station (CNS...

  11. 76 FR 52994 - Application for a License To Export Heavy Water

    Science.gov (United States)

    2011-08-24

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export Heavy Water Pursuant to 10 CFR... (liters). producing an active water). pharmaceutical ingredient known as CTP-499, which incorporates heavy water as the source of deuterium to achieve the hydrogen-deuterium exchange. November 30, 2010 December...

  12. 76 FR 53693 - Notice of Invitation To Participate; Coal Exploration License Application COC-74911, Colorado

    Science.gov (United States)

    2011-08-29

    ...] Notice of Invitation To Participate; Coal Exploration License Application COC-74911, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice. SUMMARY: Pursuant to the Mineral Leasing Act of 1920... America in lands located in Delta County, Colorado. DATES: This notice of invitation was published in the...

  13. Expert system application education project

    Science.gov (United States)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  14. 76 FR 25690 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-05-05

    .... Capital Logistics CHB Corp. (NVO & OFF), 6000 NW 97th Avenue, 9-10, Miami, FL 33178, Officers: Manuel G..., San Diego, CA 92126, Officers: Alex O. De Guzman, President, (Qualifying Individual), Abraham B. Lanuzga, Vice President, Application Type: Business Structure Change. Embarque Bandera Shipping, Inc. (NVO...

  15. 10 CFR 40.31 - Application for specific licenses.

    Science.gov (United States)

    2010-01-01

    ... response organizations expected to respond in case of an accident 60 days to comment on the licensee's... environment shall be filed at least 9 months prior to commencement of construction of the plant or facility in... case of renewal applications submitted before July 27, 1990, this submittal may follow the renewal...

  16. 76 FR 9015 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-02-16

    ... Global Logistics, LLC (NVO & OFF), 53 Perimeter Center East, Suite 450, Atlanta, GA 30346. Officer: Chad... Street, Doral, FL 33126. Officers: Juan P. Constain, General Manager (Qualifying Individual), Santiago...). Application Type: Add NVO Service. CoscoEx (CGL), Inc. dba Citic Global Logistics dba Chimerica Global...

  17. 76 FR 71034 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-11-16

    ... at (202) 523-5843 or by email at [email protected] . AAB Global Logistics, LLC (NVO & OFF), 201 E. Dundee...), Robert E. Cleary, Manager. Application Type: Name Change. Abco International Freight (USA) Inc. dba Abco Logistics (NVO), 9420 Telstar Avenue, 203, El Monte, CA 91731. Officers: Shermin Kong, Treasurer (Qualifying...

  18. 78 FR 63475 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-10-24

    ... dba Fachel Shipping & Logistics (NVO & OFF), 6331 Belair Road, Baltimore, MD 21206, Officers: Chinyere W. Osasuyi, Chief Executive Manager (QI), Famous I. Osasuyi, Chief Executive Member. Application... Change. Perimeter International dba Perimeter Logistics (NVO & OFF), 2700 Story Road, Suite 150, Irving...

  19. Barnwell Nuclear Fuel Plant. License application, amendment 10

    International Nuclear Information System (INIS)

    1975-01-01

    Amendment No. 10 provides the applicant's responses to questions raised by the AEC in letters dated November 6 and December 5, 1974. Amendment No. 3, dated February 1975, to the BNFP Separations Facility Final Safety Analysis Report (FSAR) is included. The amendment consists of revision pages for volumes 1 through 5 of the FSAR along with a deletion and insertion guide. (U.S.)

  20. 7 CFR 46.4 - Application for license.

    Science.gov (United States)

    2010-01-01

    ... principal office. A limited liability company shall also furnish a copy of its articles of organization and... the trustee must be furnished. If the applicant is a limited liability company and a member or holder of more than 10 percent of the ownership stake is a partnership, another limited liability company...

  1. 75 FR 42446 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-07-21

    ... Transportation Intermediary (OTI) pursuant to section 19 of the Shipping Act of 1984 as amended (46 U.S.C... Shipping Limited (NVO), 1000 Corporate Center Drive, Suite 320, Monterey Park, CA 91754. Officers: Joey Tam, President/CEO (Qualifying Individual), Yu C. Lee, Secretary/Treasurer. Application Type: Name Change. Ever...

  2. 75 FR 63476 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2010-10-15

    .... David A. Knott dba DAK Logistics Services (NVO), 1010 Bluejay Drive, Suisun City, CA 94585. Officer... Office of Transportation Intermediaries, Federal Maritime Commission, Washington, DC 20573. ACS Logistics.... Application Type: QI Change. Archer Logistics USA LLC (NVO), 6051 Kennedy Boulevard East, PhB, West New York...

  3. 78 FR 23252 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-04-18

    .... Logistics, Inc. dba BE Logistics dba Belogistics dba Core Logistics (NVO), 12911 Simms Avenue, Hawthorn, CA... (QI), Kevin L. Miller, Secretary, Application Type: QI Change Triple Eagle Logistics Inc. dba Triple Eagle Logistic Canada Inc. (NVO & OFF), 17890 Castleton Street, Suite 367, City of Industry, CA 91748...

  4. 77 FR 9657 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-02-17

    ..., Owner, Application Type: Add OFF Service. Cargo Tours International, Inc. dba CTI Global Logistics (NVO.... Deckwell Sky (USA) Inc. dba Monarch Container Line (NVO & OFF), 14343 E. Don Julian Road, City of Industry.... Logistics, Inc. (NVO & OFF), 3905 West Albany Street, McHenry, IL 60050, Officers: Arthur N. Nutig, Chief...

  5. 78 FR 78956 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-12-27

    ... & OFF), 1515 Kona Drive, Compton, CA 90220, Officers: Won Rok (aka Steve) Choi, CFO (QI), Myeong H. Kim..., El Monte, CA 91731, Officers: Lynn H. Tran, Secretary (QI), Zheng Feng, CFO, Application Type: New.... 25th Street, Suite 107D, Miami, FL 33182, Officers: Sergio I. Lotero, President (QI), Stephen A. Blass...

  6. 78 FR 68444 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-14

    ... (America), Ltd. (NVO & OFF), 21061 S. Western Avenue, Suite 300, Torrance, CA 90501-1122, Officers: Mary M..., Officers: Kimberly A. Whisler Wagner, Member Manager (QI), Kara M. Norkus, Member Manager, Application Type..., Iselin, NJ 08830, Officers: Richard Kenyon, President (QI), Fernando Valenzuela, Global President...

  7. 77 FR 21559 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-10

    ... Individual). Luis Angel Rincon, Manager. Application Type: Business Structure Change and Add NVO Service. Dix.... Global Distribution & Logistics LLC (NVO & OFF), 7977 NW 21st Street, Miami, FL 33122. Officers: Jose L...: Edward J. Hathaway, Vice President-- Business Development (Qualifying Individual). Jeff Harvey, President...

  8. 78 FR 48435 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-08

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . A & J Cargo Logistics Inc... (QI), Application Type: Add Trade Name Arabia Cargo and OFF Service. CMX Global Logistics, LLC (NVO... Transport Co., Ltd. (NVO), 13101 Moore Street, Cerritos, CA 90703, Officers: Ki Hyeon Lee, CFO (QI), Seong...

  9. 78 FR 56229 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-09-12

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . ATS Logistics, LLC (NVO... Logistics Services, Inc. (NVO & OFF), One Cross Island Plaza, Suite 111, Rosedale, NY 11422, Officer: Jimmy..., Secretary, Application Type: QI Change World Link Transport, Inc. (NVO & OFF), 1220 Kona Drive, Compton, CA...

  10. 76 FR 31962 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-06-02

    .... International First Service USA, Inc. dba Global Wine Logistics, Inc. (NVO & OFF), 197 Route 18 South, Suite..., President, Application Type: Add NVO Service. Nano Express Corp. (NVO,) 5765 N. Lincoln Avenue, Suite 17... Zai Ocean Services dba Zai Container Line (NVO & OFF), 6324 NW 97th Avenue, Doral, FL 33178, Officer...

  11. 77 FR 35079 - License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC

    Science.gov (United States)

    2012-06-12

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-443; NRC-2010-0206] License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC AGENCY: Nuclear Regulatory Commission. ACTION: License renewal application; intent to prepare supplement to draft [[Page 35080

  12. Do US Medical Licensing Applications Treat Mental and Physical Illness Equivalently?

    Science.gov (United States)

    Gold, Katherine J; Shih, Elizabeth R; Goldman, Edward B; Schwenk, Thomas L

    2017-06-01

    State medical licensing boards are responsible for evaluating physician impairment. Given the stigma generated by mental health issues among physicians and in the medical training culture, we were interested in whether states asked about mental and physical health conditions differently and whether questions focused on current impairment. Two authors reviewed physician medical licensing applications for US physicians seeking first-time licensing in 2013 in the 50 states and the District of Columbia. Questions about physical and mental health, as well as substance abuse, were identified and coded as to whether or not they asked about diagnosis and/or treatment or limited the questions to conditions causing physician impairment. Forty-three (84%) states asked questions about mental health conditions, 43 (84%) about physical health conditions, and 47 (92%) about substance use. States were more likely to ask for history of treatment and prior hospitalization for mental health and substance use, compared with physical health disorders. Among states asking about mental health, just 23 (53%) limited all questions to disorders causing functional impairment and just 6 (14%) limited to current problems. While most state medical licensing boards ask about mental health conditions or treatment, only half limited queries to disorders causing impairment. Differences in how state licensing boards assess mental health raise important ethical and legal questions about assessing physician ability to practice and may discourage treatment for physicians who might otherwise benefit from appropriate care.

  13. Standard format and content for a license application to store spent fuel and high-level radioactive waste

    International Nuclear Information System (INIS)

    1989-09-01

    Subpart B, ''License Application, Form, and Contents,'' of 10 CFR Part 72, ''Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste,'' specifies the information to be covered in an application for a license to store spent fuel in an independent spent fuel storage installation (ISFSI) or to store spent fuel and high-level radioactive waste in a monitored retrievable storage facility (MRS). However, Part 72 does not specify the format to be followed in the license application. This regulatory guide suggests a format acceptable to the NRC staff for submitting the information specified in Part 72 for license application to store spent fuel in an ISFSI or to store spent fuel and high-level radioactive waste in an MRS

  14. Impact of 2D/3D-project on LOCA-licensing analysis and reactor safety of PWRs

    International Nuclear Information System (INIS)

    Winkler, F.; Krebs, W.D.

    1989-01-01

    In the past LOCA-licensing analysis has included large conservatisms to compensate for the lack of detailed two phase flow and full scale experimental data. The 2D/3D-project was established to improve the data base in order to minimize the conservatisms required. The significant results and findings of the full scale Upper Plenum Test Facility (UPTF) and from the electrically heated Slab Core Test Facility (SCTF) were particularly useful for understanding the multidimensional phenomena in the primary system and in the core of a PWR. UPTF results were used to verify the TRAC-PF1 analysis of a PWR with combined ECC-Injection during the reflood phase of a large break-LOCA. Comparison of these results with results from classic licensing calculations quantifies the large safety margin in earlier licensing procedures and in reactor systems. (orig.)

  15. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  16. Bavarian liquid hydrogen bus demonstration project - safety, licensing and acceptability aspects

    Energy Technology Data Exchange (ETDEWEB)

    Wurster, R.; Knorr, H.; Pruemm, W.

    1999-07-01

    A regular 12 m city bus of the MAN SL 202 type with an internal combustion engine adapted to hydrogen operation and auxiliary gasoline operation was demonstrated in the Bavarian cities of Erlangen and Munich between April 1996 and August 1998. Three bus operators, Erlanger Stadtwerke, Stadtwerke Muenchen and Autobus Oberbayern were testing the bus in three different operating schemes. In order to be able to perform this worldwide first public demonstration of a liquid hydrogen (LH{sub 2}) city bus in regular service, several requirements with respect to safety, licensing, training and acceptability had to be fulfilled. These activities were focusing mainly on the hydrogen specific issues such as (a) integration of onboard LH{sub 2} storage vessels, piping and instrumentation, (b) implementation of storage and refueling infrastructure in the operators' yards, (c) adaptation of the maintenance garages, (d) training of operating and maintenance personnel. During phase II of the demonstration activity a poll was performed on passengers traveling onboard the hydrogen-powered city bus in order to determined the level of acceptance among the users of the bus. The bus was designed and manufactured by MAN Nutzfahrzeuge Aktiengesellschaft. The cryogenic fuel storage and the refueling equipment were designed and manufactured by Linde AG. The realization of the hardware was financially supported by the European Commission (EC) within the Euro-Quebec Hydro-Hydrogen Pilot Project. The demonstration phase was financially supported by EC and the Bavarian State Government. Ludwig-Boelkow-Systemtechnik performed project monitoring for both funding organizations. The presentation will summarize the most important results of this demonstration phase and will address the measures undertaken in order to get the bus, the refueling infrastructure and the maintenance and operating procedures approved by the relevant authorities.

  17. Project Assessment Skills Web Application

    Science.gov (United States)

    Goff, Samuel J.

    2013-01-01

    The purpose of this project is to utilize Ruby on Rails to create a web application that will replace a spreadsheet keeping track of training courses and tasks. The goal is to create a fast and easy to use web application that will allow users to track progress on training courses. This application will allow users to update and keep track of all of the training required of them. The training courses will be organized by group and by user, making readability easier. This will also allow group leads and administrators to get a sense of how everyone is progressing in training. Currently, updating and finding information from this spreadsheet is a long and tedious task. By upgrading to a web application, finding and updating information will be easier than ever as well as adding new training courses and tasks. Accessing this data will be much easier in that users just have to go to a website and log in with NDC credentials rather than request the relevant spreadsheet from the holder. In addition to Ruby on Rails, I will be using JavaScript, CSS, and jQuery to help add functionality and ease of use to my web application. This web application will include a number of features that will help update and track progress on training. For example, one feature will be to track progress of a whole group of users to be able to see how the group as a whole is progressing. Another feature will be to assign tasks to either a user or a group of users. All of these together will create a user friendly and functional web application.

  18. 75 FR 32450 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-06-08

    .... Name of Project: C.J. Strike Hydroelectric Project. f. Location: The project is located on the Snake... Snake River. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington...

  19. Safety evaluation review of the prototype license application safety analysis report

    International Nuclear Information System (INIS)

    1991-08-01

    The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the belowground vault (BGV) alternative method of low-level radioactive waste disposal. In Volume 1 of NUREG-1375, the NRC staff provided the safety review results for an earth-mounded concrete bunker PLASAR. In the current report, the staff focused its review on the design, construction, and operational aspects of the BGV PLASAR. The staff developed review comments and questions using the Standard Review Plan (SRP), Rev. 1 (NUREG-1200) as the basis for evaluating the acceptability of the information provided in the BGV PLASAR. The detailed review comments provided in this report are intended to be useful guidance to facility developers and State regulators in addressing issues likely to be encountered in the review of a license application for a low-level-waste disposal facility. 44 refs

  20. Palo Verde Generating Station, Units 4 and 5. License application, general information

    International Nuclear Information System (INIS)

    1978-01-01

    A license application for two more Palo Verde reactors, Units 4 and 5, is presented. The two PWR reactors have a nominal net generating power each of 1,270 MW(e). Containments are steel-lined prestressed cylindrical structures with hemispherical domes. The reactors are replicas of Palo Verde 1, 2 and 3 (see DOCKETS 50528, 50529 and 50530) using the standard Combustion Engineering System 80 (see DOCKET-STN-50470)

  1. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

    International Nuclear Information System (INIS)

    Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

    2002-01-01

    If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required

  2. Estimation of expenses for low and intermediate level radioactive waste repository project in Croatia up to site license acquisition

    International Nuclear Information System (INIS)

    Schaller, A.; Lokner, V.; Subasic, D.

    2003-01-01

    The expenses needed for development of low- and intermediate level radioactive waste (LILW) repository project in Croatia include: (a) preliminary activities, (b) preparatory activities, and (c) preparing of environmental impact study. The first group of expenses are referring to the project leading activities, project plan updating, build-up of required infrastructure, preparing of licensing documentation, site investigations, data acquisition programme, pre-operational radio-ecological monitoring, modelling, safety analysis (first iteration) and public related activities. Preparatory activities are referring to purchasing of land for repository and preparatory activities for carrying out of on-site investigations, while third group of expenses are related to preparation and validation of Environmental impact study. It was found out that about 50 % of total expenses refer to build-up of infrastructure. Additional 25 % finances are related to radio-ecological monitoring, site investigations and development of calculations and models, while remaining 25 % of total estimated sum is expected to be spent for repository safety assessment, public relations, purchasing and preparing the on-site terrain for construction, etc. It was calculated 607 EUR per m3 of LILW to be needed up to site license acquisition. According to the world-wide practice, by extrapolating of additional expenses necessary for construction of the repository and acquisition of operational license, it comes out the cost of 1.723 EUR per m3 of LILW for shallow-ground and 2.412 EUR per m3 of LILW for tunnel repository. The estimated expenses for Croatia are within the span of expenses for the same purpose in the countries considered. Expected duration of the project performance up to acquisition of the site license is 4 years and 3 months. (author)

  3. Preparing as an organization, to submit or to review a construction license application for a DGR of ILW and HLW in France. French National Case - Andra - Preparing to Submit Cigeo's Creation License Application

    International Nuclear Information System (INIS)

    Boissier, Fabrice; Labalette, T.; Leverd, Pascal C.; Voinis, Sylvie

    2014-01-01

    The reversible repository in a deep geological formation is the French reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. Since the first French Act on nuclear waste management research (1991), Andra has carried out twenty years of conceptual and basic studies on the subject, leading in particular to the feasibility demonstration in 2005 and to the choice of the detailed reconnaissance zone (ZIRA) in 2010. Taking advantage from this work, Andra has now reached a new phase where the project is engaging in the design of the industrial installation named Cigeo. At this stage, the further development of the project implies that Andra undertakes a multiplicity of actions in order to successfully reach various external and internal key milestones. Of paramount importance is the careful articulation between the regulatory authorization and decision processes and the outcome of the industrial installation design phases. In 2006 was built a regulatory framework that plans a succession of step by step decisions stages: 2013: Public debate on reversibility, memory keeping, environmental and health survey modalities, dialogue with the local stakeholders to harmoniously define and plan the external infrastructures that have to be developed to support the construction and the operation of Cigeo (roads, railway tracks and terminal, power and water supplies, etc.). 2015: Creation license application and start of the regulatory review process (notably various plans of the installation, the description of the solution envisaged for the closure of the facility, the preliminary safety case (operational safety, long-term safety, protection against malevolent actions, management of incidental situations, preliminary acceptance criteria), environmental impact studies (health, salubrity, transports, human activities, nature, patrimonial aspects). 2016-2017: new parliamentary Act on the reversibility conditions of the

  4. Licensing an assured isolation facility for low-level radioactive waste. Volume 2: Recommendations on the content and review of an application

    Energy Technology Data Exchange (ETDEWEB)

    Silverman, D.J.; Bauser, M.A. [Morgan, Lewis and Bockius, Washington, DC (United States); Baird, R.D. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application.

  5. Licensing an assured isolation facility for low-level radioactive waste. Volume 2: Recommendations on the content and review of an application

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  6. 18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.

    Science.gov (United States)

    2010-04-01

    ... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power... licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is... falsehoods were made by or on behalf of the applicant. (h) Article 8. Any exempted small hydroelectric power...

  7. Online driver's license renewal.

    Science.gov (United States)

    2015-09-01

    The Kentucky Department of Vehicle Regulation is exploring the possibility of developing and implementing online : drivers license renewal. The objective of this project was to: 1) evaluate online drivers license and REAL ID renewal : programs ...

  8. 77 FR 10491 - Progress Energy Carolinas, Inc.; Notice of Application for Amendment of License and Soliciting...

    Science.gov (United States)

    2012-02-22

    ... ensuring the continued safe and reliable production of hydroelectric power at the project. Among other... Intervene, and Protests Take notice that the following hydroelectric application has been filed with the.... Name of Project: Yadkin-Pee Dee Hydroelectric Project. f. Location: Lake Tillery in Montgomery and...

  9. 76 FR 51016 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2011-08-17

    .... Name of Project: Twin Falls Hydroelectric Project. f. Location: This project is located on the Snake... application is available for inspection and reproduction at the Commission's Public Reference Room, located at... available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be...

  10. 78 FR 36014 - Deepwater Port License Application: Liberty Natural Gas, LLC, Port Ambrose Deepwater Port

    Science.gov (United States)

    2013-06-14

    ... timeline for processing an application. When MarAd and USCG determine that an application contains the... that Port Ambrose falls within the proposed area of interest for the New York Power Authority Long Island-New York City Offshore Wind Project. This project will be acknowledged and considered in the...

  11. Development, assessment, licensing, and application of RELAP5YA at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Husain, A.

    1984-01-01

    Since 1975, Yankee Atomic Electric Company (YAEC) has been licensed to perform LOCA analyses (large and small breaks) for PWRs. The methods are based upon the WREM package, comprised of RELAP4-MOD 3, RELAP4-FLOOD, and TOODEE-2EM. Significant efforts were expended to compare WREM models against Appendix K criteria, and to incorporate changes for compliance with the criteria and for improved representation of LOCA phenomena. /SUP 2,3,4/ This internalized capability has been used extensively for licensing the Yankee and Maine Yankee plants, and for timely resolution of LOCA issues which frequently arose. The value of this internalized analysis capability was well recognized by the Yankee management. In 1979, Yankee embarked upon another LOCA Methods Development Program. One objective was to remove extra conservatisms inherent in older codes to provide additional operational flexibility for our plants. Also, we needed a code which could be used in a production mode to provide realistic response for off-normal conditions to be used in operator training and emergency guideline assessment. This program resulted in the development of RELAP5YA. The development, assessment, licensing, and application of RELAP5YA at YAEC is briefly described in this paper

  12. Model tracking system for low-level radioactive waste disposal facilities: License application interrogatories and responses

    Energy Technology Data Exchange (ETDEWEB)

    Benbennick, M.E.; Broton, M.S.; Fuoto, J.S.; Novgrod, R.L.

    1994-08-01

    This report describes a model tracking system for a low-level radioactive waste (LLW) disposal facility license application. In particular, the model tracks interrogatories (questions, requests for information, comments) and responses. A set of requirements and desired features for the model tracking system was developed, including required structure and computer screens. Nine tracking systems were then reviewed against the model system requirements and only two were found to meet all requirements. Using Kepner-Tregoe decision analysis, a model tracking system was selected.

  13. Model tracking system for low-level radioactive waste disposal facilities: License application interrogatories and responses

    International Nuclear Information System (INIS)

    Benbennick, M.E.; Broton, M.S.; Fuoto, J.S.; Novgrod, R.L.

    1994-08-01

    This report describes a model tracking system for a low-level radioactive waste (LLW) disposal facility license application. In particular, the model tracks interrogatories (questions, requests for information, comments) and responses. A set of requirements and desired features for the model tracking system was developed, including required structure and computer screens. Nine tracking systems were then reviewed against the model system requirements and only two were found to meet all requirements. Using Kepner-Tregoe decision analysis, a model tracking system was selected

  14. Application of ASP Technology to Realize the Online Administrative License of the earthquake in Hunan Province

    Science.gov (United States)

    Tang, Hongliang; Kang, Chengxu; Tian, Youping

    2018-01-01

    Realizing the online handling of administrative approval of earthquakes is an important measure to improve work efficiency and facilitate people’s convenience. Based on the analysis of the characteristics and processes of the administrative licensing in the earthquake industry, this paper proposes an online processing model based on ASP technology and an online processing system based on B/S architecture. This paper presents the design and implementation methods. The application of the system shows that the system is simple in design and full in function, and can be used on mobile platforms such as computers and mobile phones, and has good practicability and forward-lookingness.

  15. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Science.gov (United States)

    2010-10-01

    ... space stations. (a) Earth station applicants or entities filing a “letter of intent” or “Petition for... Union. (d) Earth station applicants requesting authority to operate with a non-U.S.-licensed space... 47 Telecommunication 2 2010-10-01 2010-10-01 false Application requirements for earth stations...

  16. Review process for low-level radioactive waste disposal license application under Low-Level Radioactive Waste Policy Amendments Act

    International Nuclear Information System (INIS)

    Pittiglio, C.L. Jr.

    1987-08-01

    This document estimates the level of effort and expertise that is needed to review a license application within the required time. It is intended to be used by the NRC staff as well as States and interested parties to provide a better understanding of what the NRC envisions will be involved in licensing a low-level radioactive waste disposal facility. 5 refs., 3 figs., 1 tab

  17. Spent Nuclear Fuel Project path forward: nuclear safety equivalency to comparable NRC-licensed facilities

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1995-11-01

    This document includes the Technical requirements which meet the nuclear safety objectives of the NRC regulations for fuel treatment and storage facilities. These include requirements regarding radiation exposure limits, safety analysis, design and construction. This document also includes administrative requirements which meet the objectives of the major elements of the NRC licensing process. These include formally documented design and safety analysis, independent technical review, and oppportunity for public involvement

  18. 77 FR 38618 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-06-28

    ... Hydroelectric Project. f. Location: The project is located in south-western Idaho on the Snake River from river... application is available for inspection and reproduction at the Commission's Public Reference Room, located at... available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be...

  19. Preparing as an organization to review a construction license application for a DGR for HLW and SF in the USA

    International Nuclear Information System (INIS)

    Hill, Brittain

    2014-01-01

    Although formally opposed by the State of Nevada, the Yucca Mountain site (Nevada) recommendation was approved by the U.S. Congress and the President, which authorized DOE to prepare and submit a license application for a deep geologic repository for the nation's spent nuclear fuel and high-level waste. In June of 2008, DOE submitted this application to the U.S. Nuclear Regulatory Commission (NRC) for its review and formal adjudication of contested issues during a 3-4 year period. Although subsequent actions by the Administration and Congress have changed the direction for geologic disposal in the U.S., the NRC staff was able to conduct a thorough technical review of the DOE license application and issue technical evaluation reports before the review and hearings were suspended in September 2011. This paper provides the author's perspective on how the NRC prepared for, and conducted, this first-of-a-kind licensing review: planning framework, key preparations for staff and for processes, events after the receipt of a license application, retrospective on staff preparations and on processes. By the end of September 2011, the NRC staff had issued three Technical Evaluation Reports using a risk-informed, performance-based approach to review the DOE license application for this deep geologic repository at Yucca Mountain

  20. The PRINCE Project and its Applications (clone)

    OpenAIRE

    Bescos, Sylvie; Bisière, Christophe; Gailly, Pierre-Joseph; Krautter, Wolfgang

    1992-01-01

    The Esprit project Prince aims at development of an industrial Constraint Logic Programing environment based on the Prolog III language. In parallel, the current technology is being validated within the project on representative real-world examples. This paper describes the current status of the three application domains which were Selected to demonstrate the applicability and usefulness of CLP. These applications deal with industrial systems engineering, medium term banking planning and jobs...

  1. The safety case in support of the license application of the surface repository of low-level waste in Dessel, Belgium

    International Nuclear Information System (INIS)

    Wacquier, William; Cool, Wim

    2014-01-01

    The modern concept of the safety case, developed by the OECD/NEA for geological repositories of high- and medium-level waste has been successfully applied by ONDRAF/ NIRAS for a surface repository for Category A waste (i.e. low-level waste) in Belgium in the current project phase 2006-2012. This resulted in the submission on 31 January 2013 by ONDRAF/NIRAS of an application for a 'construction and operation license' to the safety authorities. The benefits of using the notion of the safety case have been that: i) safety has been incorporated in an integrated manner within all assessment basis, design and safety assessment activities; ii) the process of development of the license application has gained in clarity and traceability; iii) the documentation of the license application contains multiple lines of argumentation for safety rather than argumentation based only on quantitative radiological impact calculations. To offer a comprehensive view on the safety argumentation and its development, it has been found useful to develop the argumentation not only along a safety statements structure but also along the safety report structure. (authors)

  2. 76 FR 81992 - PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant; Exemption

    Science.gov (United States)

    2011-12-29

    ... License Application for Bell Bend Nuclear Power Plant; Exemption 1.0 Background PPL Bell Bend, LLC... for Nuclear Power Plants.'' This reactor is to be identified as Bell Bend Nuclear Power Plant (BBNPP... based upon the U.S. EPR reference COL (RCOL) application for UniStar's Calvert Cliffs Nuclear Power...

  3. Gibbs and Hill Standard Safety Analysis Report, GIBBSSAR. License application, volume 1: chapters 1--3 (section 7)

    International Nuclear Information System (INIS)

    1977-01-01

    License application for the GIBBSSAR Standard Plant is presented. The reactor used with the GIBBSSAR balance-of-plant system is the Westinghouse 3800 MW(t) PWR. This portion of the application includes a general plant description; site characteristics; and design of structures, components, equipment and systems

  4. Safety evaluation status report for the prototype license application safety analysis report

    International Nuclear Information System (INIS)

    1989-07-01

    The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the earth-mounded concrete bunker (EMCB) alternative method of low-level radioactive waste disposal. The NRC reviewers relied extensively on the Standard Review Plan (SRP), Rev.1 (NUREG-1200), to evaluate the acceptability of the information provided in the EMCB PLASAR. The NRC staff selected certain review areas in the PLASAR for development of safety evaluation report input to provide examples of safety assessments that are necessary as part of a licensing review. Because of the fictitious nature of the assumed disposal site, and the decision to limit the review to essentially first-round review status, the NRC staff report is labeled a ''Safety Evaluation Status Report'' (SESR). Appendix A comprises the NRC review comments and questions on the information that DOE submitted in the PLASAR. The NRC concentrated its review on the design and operations-related portions of the EMCB PLASAR

  5. 75 FR 57266 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-09-20

    ...) is located on the Snake River in Gooding, Twin Falls and Elmore Counties, Idaho. The Lower Salmon Falls Project (P-2061) is located on the Snake River in Gooding and Twin Falls Counties, Idaho. Both.... Locations of the Application: A copy of the application is available for inspection and reproduction at the...

  6. Screening Analysis of Criticality Features, Events, and Processes for License Application

    International Nuclear Information System (INIS)

    J.A. McClure

    2004-01-01

    This report documents the screening analysis of postclosure criticality features, events, and processes. It addresses the probability of criticality events resulting from degradation processes as well as disruptive events (i.e., seismic, rock fall, and igneous). Probability evaluations are performed utilizing the configuration generator described in ''Configuration Generator Model'', a component of the methodology from ''Disposal Criticality Analysis Methodology Topical Report''. The total probability per package of criticality is compared against the regulatory probability criterion for inclusion of events established in 10 CFR 63.114(d) (consider only events that have at least one chance in 10,000 of occurring over 10,000 years). The total probability of criticality accounts for the evaluation of identified potential critical configurations of all baselined commercial and U.S. Department of Energy spent nuclear fuel waste form and waste package combinations, both internal and external to the waste packages. This criticality screening analysis utilizes available information for the 21-Pressurized Water Reactor Absorber Plate, 12-Pressurized Water Reactor Absorber Plate, 44-Boiling Water Reactor Absorber Plate, 24-Boiling Water Reactor Absorber Plate, and the 5-Defense High-Level Radioactive Waste/U.S. Department of Energy Short waste package types. Where defensible, assumptions have been made for the evaluation of the following waste package types in order to perform a complete criticality screening analysis: 21-Pressurized Water Reactor Control Rod, 5-Defense High-Level Radioactive Waste/U.S. Department of Energy Long, and 2-Multi-Canister Overpack/2-Defense High-Level Radioactive Waste package types. The inputs used to establish probabilities for this analysis report are based on information and data generated for the Total System Performance Assessment for the License Application, where available. This analysis report determines whether criticality is to be

  7. Sustainability Through Technology Licensing and Commercialization: Lessons Learned from the TRIAD Project.

    Science.gov (United States)

    Payne, Philip R O

    2014-01-01

    Ongoing transformation relative to the funding climate for healthcare research programs housed in academic and non-profit research organizations has led to a new (or renewed) emphasis on the pursuit of non-traditional sustainability models. This need is often particularly acute in the context of data management and sharing infrastructure that is developed under the auspices of such research initiatives. One option for achieving sustainability of such data management and sharing infrastructure is the pursuit of technology licensing and commercialization, in an effort to establish public-private or equivalent partnerships that sustain and even expand upon the development and dissemination of research-oriented data management and sharing technologies. However, the critical success factors for technology licensing and commercialization efforts are often unknown to individuals outside of the private sector, thus making this type of endeavor challenging to investigators in academic and non-profit settings. In response to such a gap in knowledge, this article will review a number of generalizable lessons learned from an effort undertaken at The Ohio State University to commercialize a prototypical research-oriented data management and sharing infrastructure, known as the Translational Research Informatics and Data Management (TRIAD) Grid. It is important to note that the specific emphasis of these lessons learned is on the early stages of moving a technology from the research setting into a private-sector entity and as such are particularly relevant to academic investigators interested in pursuing such activities.

  8. [Radiation protection in medical research : Licensing requirement for the use of radiation and advice for the application procedure].

    Science.gov (United States)

    Minkov, V; Klammer, H; Brix, G

    2017-07-01

    In Germany, persons who are to be exposed to radiation for medical research purposes are protected by a licensing requirement. However, there are considerable uncertainties on the part of the applicants as to whether licensing by the competent Federal Office for Radiation Protection is necessary, and regarding the choice of application procedure. The article provides explanatory notes and practical assistance for applicants and an outlook on the forthcoming new regulations concerning the law on radiation protection of persons in the field of medical research. Questions and typical mistakes in the application process were identified and evaluated. The qualified physicians involved in a study are responsible for deciding whether a license is required for the intended application of radiation. The decision can be guided by answering the key question whether the study participants would undergo the same exposures regarding type and extent if they had not taken part in the study. When physicians are still unsure about their decision, they can seek the advisory service provided by the professional medical societies. Certain groups of people are particularly protected through the prohibition or restriction of radiation exposure. A simplified licensing procedure is used for a proportion of diagnostic procedures involving radiation when all related requirements are met; otherwise, the regular licensing procedure should be used. The new radiation protection law, which will enter into force on the 31st of december 2018, provides a notification procedure in addition to deadlines for both the notification and the licensing procedures. In the article, the authors consider how eligible studies involving applications of radiation that are legally not admissible at present may be feasible in the future, while still ensuring a high protection level for study participants.

  9. Current regulatory and licensing status for byproduct sources, facilities and applications

    International Nuclear Information System (INIS)

    Tingey, G.L.; Jensen, G.A.; Hazelton, R.F.

    1985-02-01

    Public use of nuclear byproducts, especially radioactive isotopes, will require approval by various regulatory agencies. Use of cesium-137 as an irradiation source for sterilizing medical products will require US Nuclear Regulatory Commission (NRC) approval. Two applications have been filed with NRC, and approval is expected soon. Widespread use of irradiation for food products depends on a favorable ruling by the Food and Drug Administration (FDA). A ruling is pending that would permit irradiation of fruits and vegetables up to 100 krad. NRC also controls the use of isotopes in remote power generators, but little regulatory action has been required in recent years. Recent development of radioluminescent (RL) lighting for runway lights has led to interest by commercial manufacturers. At the present time, a license has been issued to at least one manufacturer for sale of tritium-powered runway lights. 28 refs., 1 fig

  10. Applications in Engineering: Project MANUVAR

    International Nuclear Information System (INIS)

    Frutos, E. M.; Flores, S.; Marcelles, I.

    2010-01-01

    The European project belongs Maneuver the Seventh Framework Programme of the European Union, on the theme NMP-2007-3.1-1: Beyond Lean Manufacturing - New Industrial Models for Product and Process Life Cycle and aims to develop an innovative technology platform, based virtual environments, providing support to high value craft along the life cycle of a product, in order to increase productivity and quality and at the same time reducing the cost associated.

  11. Computer applications in project KARP

    International Nuclear Information System (INIS)

    Raju, R.P.; Siddiqui, H.R.

    1992-01-01

    For effective project implementation of Kalpakkam Reprocessing Plant (KARP) at Kalpakkam, an elaborate Management Information Systems (MIS) was developed in-house for physical and financial progress monitoring and reporting. Computer aided design software for design of process piping layout was also developed and implemented for generation of process cell piping drawings for construction purposes. Modelling and simulation studies were carried out to optimize process parameters and fault tree analysis techniques utilised for evaluating plant availability factors. (author). 2 tabs

  12. Nuclear Regulatory Commission staff development of the license application review plan for a high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Johnson, R.L.; Holonich, J.J.; Lee, M.P.; Delligatti, M.S.

    1993-01-01

    The Nuclear Regulatory Commission staff has recently started a new initiative to develop the License Application Review Plan (LARP) which the staff will use in its reviews of the U.S. Department of Energy's (DOE's) license application (LA) for a geologic repository for the disposal of high-level radioactive waste (HLW). This paper describes the staff's approach for developing the LARP, the development schedule and current status, the organization and content of the LARP, and the staff's LA review strategy. Therefore, it gives a preview of the draft LARP which will be made available in late 1993. It also describes how the LARP will be used as guidance to the staff in conducting reviews of regulatory and technical issues important to the licensing of a geologic repository. Finally, the benefits to the NRC staff, DOE, and other parties are discussed

  13. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  14. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  15. Environmental Projects for Aerospace Applications

    Science.gov (United States)

    2012-05-23

    successful, the end product would be laboratory qualification of a total hexavalent chrome free coating systems for use on magnesium transmission...qualification testing of a completely hexavalent chrome free coating system by utilizing a hexavalent chrome free topcoat, primer, and pretreatment...Evaluate the use of hexavalent chrome free conversion coatings for depot and field applications.  Alodine 5700 and Alodine T 5900 immersion for

  16. Applicability of IBAMA normative instruction 146-2007 to pipeline environmental licensing

    Energy Technology Data Exchange (ETDEWEB)

    Basbaum, Marcos A.; Fonseca, Renata A.A. [Servicos de Engenharia Emilio Baumgart Ltda. (SEEBLA), Rio de Janeiro, RJ(Brazil)], e-mail: mbasbaum.seebla@petrobras.com.br, e-mail: renataamorim.seebla@petrobras.com.br; Torggler, Bianca F.; Fernandes, Renato; Guimaraes, Ricardo Z.P. [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)], e-mail: torggler@petrobras.com.br, e-mail: renatofer@petrobras.com.br, e-mail: rzaluar@petrobras.com.br

    2009-07-01

    PETROBRAS has been conducting several wildlife programs in response to environmental licensing requirements from IBAMA (Brazilian environmental agency). Since 2007, IBAMA has been requiring the application of the Normative Instruction n. 146 (NI), which establishes criteria for wildlife management in the influence areas of new enterprises. However, experience from PETROBRAS has shown that many of the NI articles are not applicable to pipelines. Thus, a critical analysis of this NI was done based on data from company's wildlife programs. Our analysis indicated that the main NI items that do not apply to pipelines are: 1 - Animal rescue programs in deforested areas and selection of release areas, 2 - More than two fauna monitoring campaigns a year, 3 - Monitoring programs involving all groups of terrestrial vertebrates and also invertebrate classes. The non-applicability of these items is due to: 1 - The majority of pipelines are built in areas without significant native vegetation or with small fragments only, which are usually in secondary stage of ecological succession. Most pipelines scarcely involve removal of primary vegetation, 2 - Pipelines have an influence area restricted to a range of 800 m and the construction directly affects only strips from 20 m to 30 m, 3 - The most relevant impacts associated with pipelines are temporary, and do not persist during their operation. (author)

  17. Irreducible projective representations and their physical applications

    Science.gov (United States)

    Yang, Jian; Liu, Zheng-Xin

    2018-01-01

    An eigenfunction method is applied to reduce the regular projective representations (Reps) of finite groups to obtain their irreducible projective Reps. Anti-unitary groups are treated specially, where the decoupled factor systems and modified Schur’s lemma are introduced. We discuss the applications of irreducible Reps in many-body physics. It is shown that in symmetry protected topological phases, geometric defects or symmetry defects may carry projective Rep of the symmetry group; while in symmetry enriched topological phases, intrinsic excitations (such as spinons or visons) may carry projective Rep of the symmetry group. We also discuss the applications of projective Reps in problems related to spectrum degeneracy, such as in search of models without sign problem in quantum Monte Carlo simulations.

  18. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  19. Automation of the DoD Export License Application Review Process

    National Research Council Canada - National Science Library

    Young, Shelton

    2002-01-01

    .... The overall audit objective was to determine whether Federal automation programs supporting the export license and review process could be used to establish a common electronic interface creating...

  20. 77 FR 39675 - Applications for Licensing as a Non-Leveraged Rural Business Investment Company Under the Rural...

    Science.gov (United States)

    2012-07-05

    ... large 3-ring binder. Label the binders with the RBIC's name. Submit one complete and unbound one-sided hard copy of the MAQ and Exhibits suitable for photocopying (i.e., no hole punches, staples, paper clips, tabs or binders). Applicants must enclose in their submission a nonrefundable licensing fee of...

  1. 76 FR 81994 - UniStar Nuclear Energy; Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit...

    Science.gov (United States)

    2011-12-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 52-016; NRC-2008-0250] UniStar Nuclear Energy; Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit 3; Exemption 1.0 Background: UniStar Nuclear Energy (UNE) submitted to the U.S. Nuclear Regulatory Commission (NRC or the Commission ) a...

  2. 76 FR 11522 - In the Matter of Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear...

    Science.gov (United States)

    2011-03-02

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 52-029-COL, 52-030-COL] In the Matter of Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear Power Plant, Units 1 and 2... by the Nuclear Regulatory Commission staff in this case. Mr. Dehmel has not previously performed any...

  3. 78 FR 5196 - Notice of Invitation To Participate; Exploration for Coal in Colorado License Application COC-75642

    Science.gov (United States)

    2013-01-24

    ...] Notice of Invitation To Participate; Exploration for Coal in Colorado License Application COC-75642... Mineral Leasing Act of 1920, as amended by the Federal Coal Leasing Amendments Act of 1976, and to Bureau..., Colorado. DATES: Any party electing to participate in this exploration program must send written notice to...

  4. 76 FR 55701 - Notice of Invitation to Participate; Exploration for Coal in Colorado License Application COC-74895

    Science.gov (United States)

    2011-09-08

    ...] Notice of Invitation to Participate; Exploration for Coal in Colorado License Application COC-74895... Mineral Leasing Act of 1920, as amended by the Federal Coal Leasing Amendments Act of 1976, and to Bureau... coal deposits owned by the United States of America in lands located in Routt County, Colorado. DATES...

  5. Lessons learned from the licensing process and the operational performance of the important to safety digital application implemented at the Mexican nuclear facilities

    International Nuclear Information System (INIS)

    Ledesma-Carrion, R.

    1998-01-01

    This paper describes the main concerns detected during the licensing processes performed by the Mexican Nuclear Regulatory Commission (CNSNS) for the NUMAC-PRNM, the Integrated Computer Systems at the Laguna Verde Nuclear Power Station (LVNPS) and for the Digital Control Console of the Triga Mark III Research Reactor (TMRR). The review and approval process was performed following the guidelines of the US Nuclear Regulatory Commission (USNRC); the regulatory frame applied includes the Code of Federal Regulation (10CFR50), some Regulatory Guides, such as: RG 1.152, RG 1.153, some Industrial Standards, for example: IEEE-279, IEEE-603, IEEE-7.4.3-2. Also, based on the operational experience taken from the LVNPS License Event Report (LER) reported under the 10CFR50.72 and 10CFR50.73 USNRC rules, and from the Report of Events to be Analyzed (REA) issued for a CNSNS agreement with the utility stated by the necessity to determine failure rates of digital equipment, some case studies and a preliminary failure cause classification is shown. The Event Report evaluation covered topics related to the software, hardware and firmware issues. Finally, the lessons learned from the licensing assessments and from the operational experience of the digital applications implemented are presented. It will also give the regulatory activities related to an IAEA international cooperation project on I and C digital upgrade concerns. (author)

  6. Standard format and content for the physical protection section of a license application (for facilities other than nuclear power plants)

    International Nuclear Information System (INIS)

    1976-06-01

    The document presented has been prepared as an aid to uniformity and completeness in the preparation and review of the physical protection section of license applications. It is applicable to fuel reprocessing plants, fuel manufacturing plants, SNM tranportation, or other special nuclear material operations involving the possession and use of uranium 235 (contained in uranium enriched to 20 percent or more in the U-235 isotope), uranium 233, or plutonium alone or in any combination in a quantity of 5000 grams or more computed by the formula: grams = (grams contained U-235) + 2.5 (grams U-233 + grams plutonium). The document is not intended to be used for nuclear power plants. The information specified is the minimum needed for a license application. Additional information may be required for completion of the staff review of a particular application

  7. 47 CFR 97.21 - Application for a modified or renewed license grant.

    Science.gov (United States)

    2010-10-01

    ... name, club name, license trustee name or license custodian name in accordance with § 1.913 of this... form to a Club Station Call Sign Administrator who must submit the information thereon to the FCC in an electronic batch file. The Club Station Call Sign Administrator must retain the collected information for at...

  8. Development of RESRAD probabilistic computer codes for NRC decommissioning and license termination applications

    International Nuclear Information System (INIS)

    Chen, S. Y.; Yu, C.; Mo, T.; Trottier, C.

    2000-01-01

    In 1999, the US Nuclear Regulatory Commission (NRC) tasked Argonne National Laboratory to modify the existing RESRAD and RESRAD-BUILD codes to perform probabilistic, site-specific dose analysis for use with the NRC's Standard Review Plan for demonstrating compliance with the license termination rule. The RESRAD codes have been developed by Argonne to support the US Department of Energy's (DOEs) cleanup efforts. Through more than a decade of application, the codes already have established a large user base in the nation and a rigorous QA support. The primary objectives of the NRC task are to: (1) extend the codes' capabilities to include probabilistic analysis, and (2) develop parameter distribution functions and perform probabilistic analysis with the codes. The new codes also contain user-friendly features specially designed with graphic-user interface. In October 2000, the revised RESRAD (version 6.0) and RESRAD-BUILD (version 3.0), together with the user's guide and relevant parameter information, have been developed and are made available to the general public via the Internet for use

  9. Qualification of the coupled RELAP5/PANTHER/COBRA code package for licensing applications

    International Nuclear Information System (INIS)

    Schneidesch, C.R.; Zhang Jinzhao

    2004-01-01

    A coupled thermal hydraulics-neutronics code package has been developed at Tractebel Engineering (TE), in which the best-estimate thermal-hydraulic system code, RELAP5/mod2.5, is coupled with the full three-dimensional reactor core kinetics code, PANTHER, via the dynamic data exchange interface, TALINK. The Departure from Nucleate Boiling Ratio (DNBR) is calculated by the sub-channel thermal-hydraulic analysis code COBRA-3C. The package provides the capability to accurately simulate the key physical phenomena in nuclear power plant accidents with strong asymmetric behaviours and system-core interactions. This paper presents the TE coupled code package and focuses on the methodology followed for qualifying it for licensing applications. The qualification of the coupling demonstrated the robustness achieved by the combined 3-D neutron kinetics/system T-H code package for transient simulations. The coupled TE code package has been qualified and will be used at Tractebel Engineering (TE) for analyzing asymmetric PWR accidents with strong core-system interactions

  10. How a regulator is preparing for reviewing a license application file: The case of ASN

    International Nuclear Information System (INIS)

    Tanguy, Loic

    2014-01-01

    The French Nuclear Safety Authority (ASN) is an independent administrative authority. It prepares regulation pertaining to the management of radioactive waste, monitors the control of safety of basic nuclear installations that produce or treat waste or are involved in their disposal and performs inspections of waste producers (EDF, AREVA, CEA, hospitals, research centres, etc.) and Andra, the French National Radioactive Waste Management Agency. It regulates the overall system set up by Andra for accepting waste from producers and assesses waste management policy and the practices of radioactive waste producers. It reviews license applications and authorises commissioning of nuclear installations. In order to review technical documents, ASN benefits from the expertise of technical support organisations. The French Institute for Radiation Protection and Nuclear Safety (IRSN) is the main such organisation. ASN has been making efforts to diversify its experts for several years. In preparing its decisions, ASN also calls on the opinions and recommendations of seven Advisory Committees of Experts (GPE), with expert knowledge in the areas of waste, nuclear pressure equipment, medical exposure, non-medical radiation protection, reactors, transport, and laboratories and nuclear plants. ASN consults the GPEs in preparing its main decisions. In particular, they review the preliminary, provisional and final safety analysis reports for each nuclear installation. They can also be consulted about changes in regulations or doctrine. (authors)

  11. Advanced Turbine Technology Applications Project (ATTAP)

    Science.gov (United States)

    1994-01-01

    Reports technical effort by AlliedSignal Engines in sixth year of DOE/NASA funded project. Topics include: gas turbine engine design modifications of production APU to incorporate ceramic components; fabrication and processing of silicon nitride blades and nozzles; component and engine testing; and refinement and development of critical ceramics technologies, including: hot corrosion testing and environmental life predictive model; advanced NDE methods for internal flaws in ceramic components; and improved carbon pulverization modeling during impact. ATTAP project is oriented toward developing high-risk technology of ceramic structural component design and fabrication to carry forward to commercial production by 'bridging the gap' between structural ceramics in the laboratory and near-term commercial heat engine application. Current ATTAP project goal is to support accelerated commercialization of advanced, high-temperature engines for hybrid vehicles and other applications. Project objectives are to provide essential and substantial early field experience demonstrating ceramic component reliability and durability in modified, available, gas turbine engine applications; and to scale-up and improve manufacturing processes of ceramic turbine engine components and demonstrate application of these processes in the production environment.

  12. 75 FR 23808 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-05-04

    ... most adverse moderation conditions feasible by unborated water. By meeting this criteria, the removal... Risk Assessment in Risk-Informed Decisions On Plant-Specific Changes to the Licensing Basis,'' and RG 1...

  13. 76 FR 77565 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-12-13

    ... intervene shall be filed in accordance with the Commission's ''Rules of Practice for Domestic Licensing...- conservative emergency diesel generator fuel oil supply volumes, incorporate portions of Technical... of the associated Technical Specifications to require an adequate emergency diesel generator and...

  14. The Swedish radiological environmental protection regulations applied in a review of a license application for a geological repository for spent nuclear fuel.

    Science.gov (United States)

    Andersson, Pål; Stark, Karolina; Xu, Shulan; Nordén, Maria; Dverstorp, Björn

    2017-11-01

    For the first time, a system for specific consideration of radiological environmental protection has been applied in a major license application in Sweden. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a geological repository for spent nuclear fuel at the Forsmark site. The license application is supported by a post-closure safety assessment, which in accordance with regulatory requirements includes an assessment of environmental consequences. SKB's environmental risk assessment uses the freely available ERICA Tool. Environmental media activity concentrations needed as input to the tool are calculated by means of complex biosphere modelling based on site-specific information gathered from site investigations, as well as from supporting modelling studies and projections of future biosphere conditions in response to climate change and land rise due to glacial rebound. SKB's application is currently being reviewed by the Swedish Radiation Safety Authority (SSM). In addition to a traditional document review with an aim to determine whether SKB's models are relevant, correctly implemented and adequately parametrized, SSM has performed independent modelling in order to gain confidence in the robustness of SKB's assessment. Thus, SSM has used alternative stylized reference biosphere models to calculate environmental activity concentrations for use in subsequent exposure calculations. Secondly, an alternative dose model (RESRAD-BIOTA) is used to calculate doses to biota that are compared with SKB's calculations with the ERICA tool. SSM's experience from this review is that existing tools for environmental dose assessment are possible to use in order to show compliance with Swedish legislation. However, care is needed when site representative species are assessed with the aim to contrast them to generic reference organism. The alternative modelling of environmental concentrations resulted in much lower

  15. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  16. AREVA advanced safety IC solutions and licensing experience for new nuclear builds and modernization projects - 15545

    International Nuclear Information System (INIS)

    Fourestie, B.; Pickelmann, J.; Richter, S.; Hilsenkopf, P.; Paris, P.

    2015-01-01

    Regulatory requirements for the Instrumentation and Control (IC) for Nuclear Power Plants have become significantly more stringent during the last 10 years in the areas of software development and qualification, traceability, diversity, or seismic requirements for instance, and with the introduction of new standards (such as the IEC 62566, or the IEC 62003). Based on a large and comprehensive experience gained from projects in several regulatory environments and different plant types (including non-OEM plants), AREVA has developed and adapted its processes and products to provide state-of-the-art IC solutions in full compliance with the regulatory demands and requirements in terms of robustness (independence, defense-in-depth, diversity and cyber-security). In this paper we present the safety IC platforms developed by AREVA. These platforms include TELEPERM XS as the computerized safety IC platform for class 1 system implementation, the Qualified Display System (QDS) for safety classified screen-based interface, and UNICORN as fully diverse analog safety IC platform for backup systems

  17. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  18. 75 FR 54330 - Intent To Grant an Exclusive Field of Use License of a U.S. Government-Owned Patent Application

    Science.gov (United States)

    2010-09-07

    ... DEPARTMENT OF DEFENSE Department of the Army Intent To Grant an Exclusive Field of Use License of a U.S. Government-Owned Patent Application AGENCY: Department of the Army, DoD. ACTION: Notice... intent to grant an exclusive, revocable license for the field of use in the research reagent market to...

  19. 75 FR 39668 - Intent To Grant a Field of Use Exclusive License of a U.S. Government-Owned Patent Application

    Science.gov (United States)

    2010-07-12

    ... DEPARTMENT OF DEFENSE Department of the Army Intent To Grant a Field of Use Exclusive License of a U.S. Government-Owned Patent Application AGENCY: Department of the Army, DoD. ACTION: Notice... intent to grant a field of use exclusive, revocable license for the field of shigella vaccine development...

  20. Social Licensing in uranium mining: Experiences from the IAEA review of the planned Mukju River Uranium Project, Tanzania

    International Nuclear Information System (INIS)

    Schnell, H.; Hilton, J.; Saint-Pierre, S.; Baldry, K.; Fan, Z.; Tulsidas, H.

    2014-01-01

    The IAEA Uranium Production Site Appraisal Team (UPSAT) programme is designed to assist Member States to enhance the operational performance and the occupational, public and environmental health and safety of uranium mining and processing facilities across all phases of the uranium production cycle. The scope of the appraisal process includes exploration, resource assessment, planning, environmental and social impact assessment, mining, processing, waste management, site management, remediation, and final closure. An UPSAT review was requested in 2010 by the United Republic of Tanzania (URT) to address the challenges the country is currently facing in developing its uranium mining and processing capability for the first time. The review that was carried out from 27 May to 5 June, 2013 had the objective to to appraise URT’s preparedness for overseeing the Uranium Production Cycle in general, at the same time focusing on the planned Mkuju River Project (MRP) in the south of the country in particular. The UPSAT team was tasked to report its findings according to five primary areas: 1. Regulatory system; 2. Sustainable uranium production life cycle; 3. Health, Safety and Environment (HSE); 4. Social licensing; 5. Capacity building. The paper will discuss the key findings and suggestions that were provided to governmental stakeholders and the operater to improve the planned operations. (author)

  1. Applicability of Item Response Theory to the Korean Nurses' Licensing Examination

    Directory of Open Access Journals (Sweden)

    Geum-Hee Jeong

    2005-06-01

    Full Text Available To test the applicability of item response theory (IRT to the Korean Nurses' Licensing Examination (KNLE, item analysis was performed after testing the unidimensionality and goodness-of-fit. The results were compared with those based on classical test theory. The results of the 330-item KNLE administered to 12,024 examinees in January 2004 were analyzed. Unidimensionality was tested using DETECT and the goodness-of-fit was tested using WINSTEPS for the Rasch model and Bilog-MG for the two-parameter logistic model. Item analysis and ability estimation were done using WINSTEPS. Using DETECT, Dmax ranged from 0.1 to 0.23 for each subject. The mean square value of the infit and outfit values of all items using WINSTEPS ranged from 0.1 to 1.5, except for one item in pediatric nursing, which scored 1.53. Of the 330 items, 218 (42.7% were misfit using the two-parameter logistic model of Bilog-MG. The correlation coefficients between the difficulty parameter using the Rasch model and the difficulty index from classical test theory ranged from 0.9039 to 0.9699. The correlation between the ability parameter using the Rasch model and the total score from classical test theory ranged from 0.9776 to 0.9984. Therefore, the results of the KNLE fit unidimensionality and goodness-of-fit for the Rasch model. The KNLE should be a good sample for analysis according to the IRT Rasch model, so further research using IRT is possible.

  2. 77 FR 1748 - Atomic Safety and Licensing Board; Calvert Cliffs 3 Nuclear Project, LLC, and UniStar Nuclear...

    Science.gov (United States)

    2012-01-11

    ... under represents potential contributions of wind and solar power, the combination alternative depends... Judge Ronald M. Spritzer, Atomic Safety and Licensing Board Panel, Mail Stop T-3F23, U.S. Nuclear..., Atomic Safety and Licensing Board Panel, Mail Stop T-3F23, U.S. Nuclear Regulatory Commission. Fax: (301...

  3. The Design Options and Provision File and the Role of Defence in Depth Within the Pre-Licensing of the MYRRHA Project

    Energy Technology Data Exchange (ETDEWEB)

    Fiorini, G. L.; Hakimi, N., E-mail: Gian-Luigi.fiorini@fanc.fgov.be [FANC (Belgium); Tombuyses, B.; Dams, C.; Wertelaers, A.; Schrauben, M.; Dresselaers, R. [Federal Agency for Nuclear Control (FANC), Bruxelles (Belgium)

    2014-10-15

    The Belgian Federal Agency for Nuclear Control (FANC) is engaged in a process of pre-licensing for the experimental reactor MYRRHA. The regulatory framework applicable for the implementation of the MYRRHA project and the expected safety, security and safeguards philosophy are described by FANC in a Strategic Note. This document presents a logical flow chart which defines the steps required to design a basic nuclear installation and ensure compliance with the requirements of nuclear safety, security and safeguards. Using this flow chart, the content of a set of volumes (Design Options and Provision File - DOPF) is defined; the DOPF will serve as a basis for the evaluation of the concept with the acceptability of the selected design options. Defence in depth (DiD) and its fundamental principles remain the foundation of the whole process. The paper summarizes the contents of the Strategic Note and the DOPF and focuses more specifically on aspects relating to changes in the concept of defence in depth and on practices for their integration in the process of design / assessment of the MYRRHA reactor. (author)

  4. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  5. Guide for the preparation of applications for special nuclear material licenses of less than critical mass quantities - July 1976

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    This guide describes the type of information needed to evaluate an application for a specific license for receipt, possession, use, and transfer of special nuclear material. It is intended for applicants requesting authorization to possess and use up to 2000 grams of plutonium, total, in the form of sealed plutonium-beryllium neutron sources, and any special nuclear material in quantities and forms not sufficient to form a critical mass. The latter quantities are considered to be 350 grams of contained uranium-235, 200 grams of uranium-233, 200 grams of plutonium (in any form other than plutonium-beryllium neutron sources) or any combination of them

  6. 76 FR 52699 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-08-23

    ... proposes to credit the automatic trip of the main turbine upon the initiation of a manual reactor trip for... credited manual reactor trip action that is part of the current licensing basis. Considerable defense-in... more robust AREVA Advanced W17 high thermal performance (HTP) fuel at Sequoyah Nuclear Plant (SQN...

  7. 75 FR 61521 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-10-05

    ... revises the charcoal testing criteria in Technical Specification 5.5.9, ``Ventilation Filter Testing... staffing from two to four, allow in-plant protective actions to be performed by personnel assigned to other functions, and replace a Mechanical Maintenance person with a Non-Licensed Operator. Date of issuance...

  8. Guidance for the licensing procedure concerning the application of radiographic equipment

    International Nuclear Information System (INIS)

    1987-01-01

    According to article 4 of the Ordinance on the Implementation of Atomic Safety and Radiation Protection dated 11 October 1984 the operation of radiographic equipment has to be licensed. The personnel and material requirements that are to be fulfilled by a licensee prior to commissioning X-ray or gamma equipment, are discussed in detail

  9. 76 FR 73727 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-11-29

    ..., Donald C. Cook Nuclear Plant, Unit 2 (DCCNP-2), Berrien County, Michigan; Date of amendment request... Counsel, Indiana Michigan Power Company, One Cook Place, Bridgman, MI 49106. NRC Acting Branch Chief: Thomas J. Wengert. Notice of Issuance of Amendments to Facility Operating Licenses During the period...

  10. 76 FR 61391 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-10-04

    ... ''Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR part 2. Interested person(s) should... to be operable in MODES 1, 2, and 3, as well as in MODE 4 when a steam generator (SG) is relied upon... stored diesel fuel oil inventory will require that a 7 day supply be available for each diesel generator...

  11. 76 FR 39136 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Science.gov (United States)

    2011-07-05

    ... the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR part 2. Interested... Generator (SG) Program,'' to exclude a portion of the tubes below the top of the steam generator tubesheet from periodic steam generator tube inspections during Refueling Outage 14 and the subsequent operating...

  12. 75 FR 37471 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-06-29

    ... accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2... Specifications (TSs) to extend the allowed outage time (AOT) for the ``A'' and ``B'' emergency diesel generators... emergency diesel generators are safety related components which provide backup electrical power supply to...

  13. 75 FR 48370 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-08-10

    ... ensures the timely transfer of plant safety system loads to the Emergency Diesel Generators in the event a... a margin of safety. The basis for this proposed determination for each amendment request is shown... Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested person(s...

  14. 47 CFR 74.113 - Supplementary reports with application for renewal of license.

    Science.gov (United States)

    2010-10-01

    ... renewal of license. 74.113 Section 74.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED... covered. (4) Power employed, field intensity measurements and visual and aural observations and the types... respective types of transmissions. (5) Estimated degree of public participation in reception and the results...

  15. 75 FR 52039 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-08-24

    ... the design earthquake, the double design earthquake, the Hosgri earthquake, and the loss-of-coolant... by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the....m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the...

  16. 75 FR 13786 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-03-23

    ... earthquake (DE), double design earthquake (DDE), Hosgri earthquake (HE), and loss of coolant accident (LOCA... Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition...-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the...

  17. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  18. Guide for the preparation of applications for licenses for the use of self-contained dry source-storage irradiators. Second proposed Revision 1

    International Nuclear Information System (INIS)

    Bassin, N.

    1984-10-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the use of self-contained dry source-storage irradiators. These irradiators are constructed so that the sealed sources and the material being irradiated are contained in a shielded volume and there is no external radiation beam during the use of the irradiator. The radioisotopes most commonly used for these irradiators are cobalt-60 and cesium-137

  19. Intervention in independent spent fuel storage facility license application proceedings for storage on the power plant site

    International Nuclear Information System (INIS)

    Jordan, J.

    1992-01-01

    This presentation summarizes the intervention in the Nuclear Regulatory Commission (NRC) licensing process for currently operating Independent Spent fuel Storage Installation (ISFSI) projects at Carolina Power and Light's Company's H.B. Robinson, Duke Power Company's Oconee, and Virginia Power Company's Surry. In addition, intervention at dry storage facilities that are currently under development are also described. The utilities and reactors include Baltimore Gas and Electric Company's Calvert Cliffs, Public Service Company of Colorado's Fort St. Vrain plant, Northern States Power Company's Prairie Island, Wisconsin Electric Power Company's Point Beach, and Consumers Power Company's Palisades

  20. A BWR licensing experience in the USA

    International Nuclear Information System (INIS)

    Powers, J.; Ogura, C.; Arai, K.; Thomas, S.; Mookhoek, B.

    2015-09-01

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  1. A BWR licensing experience in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J.; Ogura, C. [Toshiba America Nuclear Energy, Charlotte, North Carolina (United States); Arai, K. [Toshiba Corporation, Yokohama, Kanagawa (Japan); Thomas, S.; Mookhoek, B., E-mail: jim.powers@toshiba.com [Nuclear Innovation North America, Lake Jackson, Texas (United States)

    2015-09-15

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  2. Facilities license application record data as of April 1, 1981. Tri-annual report 30 Nov 80-1 Apr 81

    International Nuclear Information System (INIS)

    1981-06-01

    The FLAR is divided into three parts as follows: Part I - The first part is a listing of all operating licenses, authorizations and construction permits in effect plus applications pending; Part II - The second part is a listing of applications that have been withdrawn or denied, and licenses and construction permits terminated or revoked; and Part III - The third part is a listing of research, test and power reactors for export

  3. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  4. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  5. 77 FR 20622 - N.E.W. Hydro LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions...

    Science.gov (United States)

    2012-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2744-041; 2744-042] N.E.W....: 2744-041 & 042. c. Date Filed: March 14, 2012. d. Applicant: N.E.W. Hydro LLC. e. Name of Project.... Description of Application: N.E.W. Hydro LLC seeks approval to construct an angled fish guidance rack with...

  6. Licensing schedule for away-from-reactor (AFR) spent fuel storage facilities

    International Nuclear Information System (INIS)

    Gray, P.L.

    1981-08-01

    The Nuclear Regulatory Commission has authority to issue licenses for Away-From-Reactor (AFR) installations for the storage of spent nuclear fuel. This report presents a detailed estimate of the time required to prosecute a licensing action. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  7. Prototype Rail Crossing Violation Warning Application Project Report.

    Science.gov (United States)

    2017-09-05

    This report is the Project Report for the Rail Crossing Violation Warning (RCVW) safety application developed for the project on Rail Crossing Violation Warning Application and Infrastructure Connection, providing a means for equipped connected vehic...

  8. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  9. UHP lamp systems for projection applications

    International Nuclear Information System (INIS)

    Derra, Guenther; Moench, Holger; Fischer, Ernst; Giese, Hermann; Hechtfischer, Ulrich; Heusler, Gero; Koerber, Achim; Niemann, Ulrich; Noertemann, Folke-Charlotte; Pekarski, Pavel; Pollmann-Retsch, Jens; Ritz, Arnd; Weichmann, Ulrich

    2005-01-01

    Projection systems have found widespread use in conference rooms and other professional applications during the last decade and are now entering the home TV market at a considerable pace. Projectors as small as about one litre are able to deliver several thousand screen lumens and are, with a system efficacy of over 10 lm W -1 , the most efficient display systems realized today. Short arc lamps are a key component for projection systems of the highest efficiency for small-size projection displays. The introduction of the ultra high performance (UHP) lamp system by Philips in 1995 can be identified as one of the key enablers of the commercial success of projection systems. The UHP lamp concept features outstanding arc luminance, a well suited spectrum, long life and excellent lumen maintenance. For the first time it combines a very high pressure mercury discharge lamp with extremely short and stable arc gap with a regenerative chemical cycle keeping the discharge walls free from blackening, leading to lifetimes of over 10 000 h. Since the introduction of the UHP lamp system, many important new technology improvements have been realized: burner designs for higher lamp power, advanced ignition systems, miniaturized electronic drivers and innovative reflector concepts. These achievements enabled the impressive increase of projector light output, a remarkable reduction in projector size and even higher optical efficiency in projection systems during the last years. In this paper the concept of the UHP lamp system is described, followed by a discussion of the technological evolution the UHP lamp has undergone so far. Last, but not least, the important improvements of the UHP lamp system including the electronic driver and the reflector are discussed. (review article)

  10. Licensing topical report: application of probabilistic risk assessment in the selection of design basis accidents

    International Nuclear Information System (INIS)

    Houghton, W.J.

    1980-06-01

    A probabilistic risk assessment (PRA) approach is proposed to be used to scrutinize selection of accident sequences. A technique is described in this Licensing Topical Report to identify candidates for Design Basis Accidents (DBAs) utilizing the risk assessment results. As a part of this technique, it is proposed that events with frequencies below a specified limit would not be candidates. The use of the methodology described is supplementary to the traditional, deterministic approach and may result, in some cases, in the selection of multiple failure sequences as DBAs; it may also provide a basis for not considering some traditionally postulated events as being DBAs. A process is then described for selecting a list of DBAs based on the candidates from PRA as supplementary to knowledge and judgments from past licensing practice. These DBAs would be the events considered in Chapter 15 of Safety Analysis Reports of high-temperature gas-cooled reactors

  11. APPLICATION OF PROJECT MANAGEMENT APPROACHES AT A SMALL BUSINESSES ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Sergey V. Rajewski

    2016-01-01

    Full Text Available This article discusses the types of organizational structures of project management and their application in project management in small and medium-sized enterprises. Among the approaches and methods to organize projects emphasizing project management as part of the existing functional structure of the enterprise. Analyzed the most relevant organizational tools of project management in small business: a network schedule; matrix distribution of administrative and management tasks of the project; schedule of the project plan; information and technological methods and models used in the process of project management; software applications for project management, used in the sphere of small business.

  12. Pesticide use and risk of end-stage renal disease among licensed pesticide applicators in the Agricultural Health Study.

    Science.gov (United States)

    Lebov, Jill F; Engel, Lawrence S; Richardson, David; Hogan, Susan L; Hoppin, Jane A; Sandler, Dale P

    2016-01-01

    Experimental studies suggest a relationship between pesticide exposure and renal impairment, but epidemiological evidence is limited. We evaluated the association between exposure to 39 specific pesticides and end-stage renal disease (ESRD) incidence in the Agricultural Health Study, a prospective cohort study of licensed pesticide applicators in Iowa and North Carolina. Via linkage to the US Renal Data System, we identified 320 ESRD cases diagnosed between enrolment (1993-1997) and December 2011 among 55 580 male licensed pesticide applicators. Participants provided information on use of pesticides via self-administered questionnaires. Lifetime pesticide use was defined as the product of duration and frequency of use and then modified by an intensity factor to account for differences in pesticide application practices. Cox proportional hazards models, adjusted for age and state, were used to estimate associations between ESRD and: (1) ordinal categories of intensity-weighted lifetime use of 39 pesticides, (2) poisoning and high-level pesticide exposures and (3) pesticide exposure resulting in a medical visit or hospitalisation. Positive exposure-response trends were observed for the herbicides alachlor, atrazine, metolachlor, paraquat, and pendimethalin, and the insecticide permethrin. More than one medical visit due to pesticide use (HR=2.13; 95% CI 1.17 to 3.89) and hospitalisation due to pesticide use (HR=3.05; 95% CI 1.67 to 5.58) were significantly associated with ESRD. Our findings support an association between ESRD and chronic exposure to specific pesticides, and suggest pesticide exposures resulting in medical visits may increase the risk of ESRD. Clinicaltrials.gov NCT00352924. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  13. Parameter Selection for Department of Energy Spent Nuclear Fuel to be Used in the Yucca Mountain License Application

    Energy Technology Data Exchange (ETDEWEB)

    D. L. Fillmore

    2003-10-01

    This report contains the chemical, physical, and radiological parameters that were chosen to represent the U.S. Department of Energy spent nuclear fuel in the Yucca Mountain license application. It also contains the selected packaging requirements for the various fuel types and the criticality controls that were used. The data are reported for representative fuels and bounding fuels in groups of fuels that were selected for the analysis. The justification for the selection of each parameter is given. The data reported were not generated under any quality assurance program.

  14. Standard format and content of a license application for a low-level radioactive waste disposal facility: Safety analysis report

    International Nuclear Information System (INIS)

    1988-01-01

    This document discusses the information that should be provided in the Safety Analysis Report and establishes a uniform format for presenting the information necessary to fulfill the licensing requirements for land disposal of radioactive waste called for in 10 CFR 61. The uniform format will (1) help ensure that the Safety Analysis Report contains the information required by 10 CFR 61, (2) aid the applicant and NRC staff in ensuring that the information is complete, (3) help persons reading the Safety Analysis Report to locate information, and (4) contribute to shortening the time needed for the review process

  15. Standard format and content of a license application for a low-level radioactive waste disposal facility: Safety analysis report

    International Nuclear Information System (INIS)

    1987-01-01

    This document discusses the information that should be provided in the Safety Analysis Report and establishes a uniform format for presenting the information necessary to fulfill the licensing requirements for land disposal of radioactive waste called for in 10 CFR 61. The uniform format will (1) help ensure that the Safety Analysis Report contains the information required by 10 CFR 61, (2) aid the applicant and NRC staff in ensuring that the information is complete, (3) help persons reading the Safety Analysis Report to locate information, and (4) contribute to shortening the time needed for the review process

  16. Expert report of ENSI on the request of KKN AG for a general license - Project 'New nuclear power plant Niederamt'

    International Nuclear Information System (INIS)

    2010-09-01

    The 'Kernkraftwerk Niederamt AG' (KKN) Company submitted to the Swiss Federal Inspectorate of Nuclear Safety (ENSI) a request for a general license for a new power plant to be built near to the Goesgen power plant. According to the law, all damage risks with a probability higher than 10 -4 /a must be taken into account through protection measures. The considered risks concern the power plant itself as well as the population in the neighbourhood and the environment. The purpose of the general license is to demonstrate that the site chosen for the foreseen power plant is acceptable and that the risks can be counteracted through adequate measures. The buildings of the power plant and their partition over the two banks of the Aare River are briefly described. The reactor is a Light Water Reactor of third generation with a maximum thermal power of 5.8 GW th . The main cooling is provided by a hybrid system of water evaporation and air heating, what reduces the plume at the exit of the cooling tower. First, it is demonstrated that, in the case of a very unlikely severe accident in the power plant, the people in the neighbourhood can be evacuated quickly. Then, numerous types of possible accidents in the neighbourhood of the power plant are analyzed in order to settle their possible negative influence on the operation of the power plant: bursting of gas containers on the neighbouring roads and railways, fires of all types of hydrocarbons, air pollution through chloride gas, etc. The check by ENSI of the KKN studies on the potential danger for the power plant through neighbouring industrial plants, roads or railways demonstrated that none of the considered accidents presents an unacceptable risk for the power plant: on the one hand, these plants are located too far from the power plant, so that a sensible injury to the power plant safety can be excluded; on the other, the protection of the power plant can be guaranteed through appropriate technical measures. The power

  17. The pre-licensing of a multi-purpose hybrid research reactor for high-tech applications 'MYRRHA'

    International Nuclear Information System (INIS)

    Hakimi, N.; Dams, C.; Wertelaers, A.; Nys, V.; Schrauben, M.; Dresselaers, R.

    2013-01-01

    The Belgian Nuclear Research Centre in Mol has been working for several years on the design of a multi-purpose flexible irradiation facility in order to replace the ageing BR2, a multipurpose materials testing reactor (MTR), in operation since 1962. MYRRHA, a flexible fast spectrum research reactor is conceived as an accelerator driven system (ADS), able to operate in sub-critical and critical modes. It contains a proton accelerator of 600 MeV, a spallation target and a multiplying medium with MOX fuel, cooled by liquid lead-bismuth (Pb-Bi). Since February 2011, the Belgian Nuclear Research Centre has engaged in a 'pre-licensing' process with the regulatory authority for an estimated period up to mid 2014. The paper presents on the one hand the objectives of the pre-licensing phase as well as its implementation process and on the other hand, 2 implementing instruments which have been developed by the regulatory authority providing guidance to the designer of MYRRHA in order to meet the pre-licensing phase objectives. The first instrument is a strategic note for the design and operation of MYRRHA where as the second instrument is a guidance document for the format and content of a design options and provisions file (DOPF). Both instruments have been developed taking into account that MYRRHA is an irradiation facility using a Generation IV nuclear power system's type technology (liquid metal cooled fast neutron reactor). The strategic note overview aims to cover the safety approach as well as the security requirements and safeguards obligation applicable to MYRRHA. In particular, in the strategic note, a specific attention has been paid in order to ensure that a safety, security and safeguards integrated approach will drive the development of the MYRRHA design. The safety approach focuses on the safety goals and the minimum safety objectives set by the regulatory authority for this innovative design. The DOPF overview presents its objectives and structure resuming

  18. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  19. Evaluation of Terminated Nuclear Material Licenses

    International Nuclear Information System (INIS)

    Spencer, K.M.; Zeighami, E.A.

    1999-01-01

    This report presents the results of a six-year project that reviewed material licenses that had been terminated during the period from inception of licensing until approximately late-1994. The material licenses covered in the review project were Part 30, byproduct material licenses; Part 40, source material licenses; and Part 70, special nuclear material licenses. This report describes the methodology developed for the project, summarizes the findings of the license file inventory process, and describes the findings of the reviews or evaluations of the license files. The evaluation identified nuclear material use sites that need review of the licensing material or more direct follow-up of some type. The review process also identified licenses authorized to possess sealed sources for which there was incomplete or missing documentation of the fate of the sources

  20. 76 FR 41308 - Strata Energy, Inc., Ross In Situ Recovery Uranium Project, Crook County, WY; Notice of Materials...

    Science.gov (United States)

    2011-07-13

    ..., Inc., Ross In Situ Recovery Uranium Project, Crook County, WY; Notice of Materials License Application...-4737, or by e-mail to [email protected] . The Ross In Situ Recovery Uranium Project License... source and byproduct materials license at its Ross In Situ Recovery Uranium Project site located in Crook...

  1. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  2. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  3. 76 FR 54753 - Whitestone Power and Communications; Notice of Intent To File License Application, Filing of...

    Science.gov (United States)

    2011-09-02

    ... of Project: Microturbine Hydrokinetic River-In-Stream Energy Conversion Power Project (also known as... Contact: Steven M. Selvaggio, Whitestone Power and Communications, P.O. Box 1630, Delta Junction, Alaska... Hydrokinetic River-In-Stream Energy Conversion Power Project) and number (P-13305-002), and bear the heading...

  4. Development and application of a deterministic-realistic hybrid methodology for LOCA licensing analysis

    International Nuclear Information System (INIS)

    Liang, Thomas K.S.; Chou, Ling-Yao; Zhang, Zhongwei; Hsueh, Hsiang-Yu; Lee, Min

    2011-01-01

    Highlights: → A new LOCA licensing methodology (DRHM, deterministic-realistic hybrid methodology) was developed. → DRHM involves conservative Appendix K physical models and statistical treatment of plant status uncertainties. → DRHM can generate 50-100 K PCT margin as compared to a traditional Appendix K methodology. - Abstract: It is well recognized that a realistic LOCA analysis with uncertainty quantification can generate greater safety margin as compared with classical conservative LOCA analysis using Appendix K evaluation models. The associated margin can be more than 200 K. To quantify uncertainty in BELOCA analysis, generally there are two kinds of uncertainties required to be identified and quantified, which involve model uncertainties and plant status uncertainties. Particularly, it will take huge effort to systematically quantify individual model uncertainty of a best estimate LOCA code, such as RELAP5 and TRAC. Instead of applying a full ranged BELOCA methodology to cover both model and plant status uncertainties, a deterministic-realistic hybrid methodology (DRHM) was developed to support LOCA licensing analysis. Regarding the DRHM methodology, Appendix K deterministic evaluation models are adopted to ensure model conservatism, while CSAU methodology is applied to quantify the effect of plant status uncertainty on PCT calculation. Generally, DRHM methodology can generate about 80-100 K margin on PCT as compared to Appendix K bounding state LOCA analysis.

  5. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    International Nuclear Information System (INIS)

    Grecheck, Eugene S.; Batalo, David P.

    2010-01-01

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  6. 77 FR 59389 - Hawks Nest Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-09-27

    .... Name of Project: Hawks Nest Hydroelectric Project (P-2512-069) and Glen Ferris Hydroelectric Project (P... of Gauley Bridge, and Glen Ferris Hydroelectric Project is on the Kanawha River in the vicinity of the Town of Glen Ferris, both within Fayette County, West Virginia. The projects do not affect federal...

  7. Application of the Theory of Constraints in Project Based Structures

    OpenAIRE

    Martynas Sarapinas; Vytautas Pranas Sūdžius

    2011-01-01

    The article deals with the application of the Theory of Constraints (TOC) in project management. This article involves a short introduction to TOC as a project management method and deep analysis of project management specialties using the TOC: TOC based project planning, timetable management, tasks synchronization, project control and “relay runner work ethic”. Moreover, the article describes traditional and TOC based project management theories in their comparison, and emphasize the main be...

  8. 30 CFR 402.10 - Research-project applications.

    Science.gov (United States)

    2010-07-01

    ... project title, project objectives, background information, research tasks, methodology to conduct the... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Research-project applications. 402.10 Section... PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management...

  9. The Licensing of New Nuclear Power Plants in Europe

    International Nuclear Information System (INIS)

    Raetzke, C.

    2008-01-01

    After an introduction dealing with the nuclear Renaissance in Europe and the specific situation of Germany and of Italy, the article focuses on the question of licensing processes for new reactors. New nuclear power plant projects involve a substantial investment and electric utilities will only take this decision if the licensing and regulatory risk can be adequately managed. Licensing processes should be predictable and efficient in order to give sufficient assurance to applicants. The article discusses best practice in licensing by giving some examples of suitable licensing processes of other countries. It also highlights international initiatives aimed at harmonizing safety requirements for new reactors and a multinational cooperation in reactor design review. These issues should be carefully considered by any country wanting to get new nuclear started. [it

  10. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  11. Radiopharmaceutical licensing

    International Nuclear Information System (INIS)

    Mather, S.J.

    1992-01-01

    Recent health service legislation, and especially the loss of crown immunity has once again focussed attention on the arrangements for licensing of radiopharmaceuticals. The aim of the article is to describe in general terms the UK licensing system and in particular to provide guidance to those responsible for the supply of radiopharmaceuticals in hospitals. (author)

  12. Reactor licensing

    International Nuclear Information System (INIS)

    Harvie, J.D.

    2002-01-01

    This presentation discusses reactor licensing and includes the legislative basis for licensing, other relevant legislation , the purpose of the Nuclear Safety and Control Act, important regulations, regulatory document, policies, and standards. It also discusses the role of the CNSC, its mandate and safety philosophy

  13. 77 FR 50092 - Duke Energy Carolinas, LLC; Notice of Application for Amendment of License and Soliciting...

    Science.gov (United States)

    2012-08-20

    .... e. Name of Project: Catawba-Wateree Hydroelectric Project. f. Location: Lake Norman in Iredell..., Duke Energy Carolinas, LLC authorized modifications to the marina, which now consists of two multi-slip... layout is mostly similar to the originally-approved design except that the docks have shifted location...

  14. 77 FR 38620 - Idaho Power Company; Notice of Application for Amendment of License And Soliciting Comments...

    Science.gov (United States)

    2012-06-28

    ... Falls Hydroelectric Project. f. Location: The project is located in south-central Idaho on the Snake... reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, Washington... inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the...

  15. 77 FR 38621 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-06-28

    ... Hydroelectric Project. f. Location: The project is located in south-central Idaho on the Snake River from river... inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room... inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the...

  16. 77 FR 38619 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-06-28

    ... Hydroelectric Project. f. Location: The project is located in south-central Idaho on the Snake River in Gooding... reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, [email protected] , for TTY, call (202) 502- 8659. A copy is also available for inspection and reproduction at...

  17. 77 FR 47618 - Algonquin Power Company; Notice of Application Accepted for Amendment of License and Soliciting...

    Science.gov (United States)

    2012-08-09

    ... more information on how to submit these types of filings, please go to the Commission's Web site.... The project Lower Beaver Falls project works consist of: (1) A 4-acre reservoir formed by a 400-foot long concrete gravity dam with a maximum height of 14 feet, and a head pond elevation of 769.3 feet...

  18. 76 FR 40904 - FPL Energy Maine Hydro LLC; Notice of Application for Amendment of License and Soliciting...

    Science.gov (United States)

    2011-07-12

    ... turbine from 34,000 hp (25.5 MW) to 42,400 hp (31.8 MW) and its hydraulic capacity would increase from 2... application. k. Description of Application: The licensee proposes to replace the project's Unit 1 turbine... 27 MW instead of [[Page 40905

  19. 75 FR 66746 - Idaho Power Company and Milner Dam, Inc; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-10-29

    .... Location: The project is located on the Snake River in Twin Falls and Cassia Counties, Idaho. g. Filed... the Upper Snake Water Supply Bank. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First...

  20. Project 2019 of Garona Nuclear power plant. First project to licensing renew more than 40 years in Spain; Proyecto 2019 de Cn Garona. El primer proyecto para la renovacion de licencia mas alla de 40 anos en Espana

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, R. A.; Torralbo, J. R.

    2004-07-01

    NUCLENOR has been developing lifetime management and modernisation activities at Santa Maria de Garona NPP since the end of the 80's and the plant is now in optimum technical conditions to continue in operation beyond its original lifetime planned in the design (40 years). In the USA, the country of origin of the project, a good number of power plants with a similar design, age and history to SMG are in the process of obtaining or have already obtained, a licensing extension of up to 60 years from the NRC. In Spain, the activities required for requesting a long-term operating licensing extension include the Ageing Assessment and Management of the plant systems, structures and components, in accordance with the american regulation 10CFR54, a Radiological Impact Study for the new operating period, and an Analysis of New Legislation, not included in the licensing bases and considered to be important to safety by the CSN. With a view to obtaining a renewal of the current operating permit for the period 2009-2019, NUCLENOR has launched the Proyecto 2019, which extends to technical and licensing aspects, as it involves all the company's personnel. (Author)

  1. 78 FR 34090 - Lois Von Morganroth; Shiloh Warm Springs Ranch, LLC; Notice of Application for Transfer of...

    Science.gov (United States)

    2013-06-06

    ... Springs Ranch, LLC (transferee) filed an application for the transfer of license for the L & M Angus Ranch..., Idaho. Applicants seek Commission approval to transfer the license for the L & M Angus Ranch Project...

  2. 77 FR 20622 - PPL Holtwood, LLC; Notice of Applications for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-04-05

    ... electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site... to the project boundary and used to provide additional parking for the boat launch; (2) removal of a...

  3. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  4. Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    1994-04-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff's review process by interested members of the public and the industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission's regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements

  5. Issues in the review of a license application for an above grade low-level radioactive waste disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Ringenberg, J.D. [Nebraska Dept. of Environmental Quality, NE (United States)

    1993-03-01

    In December 1987, Nebraska was selected by the Central Interstate Compact (CIC) Commission as the host state for the construction of a low-level radioactive waste disposal facility. After spending a year in the site screening process, the Compact`s developer, US Ecology, selected three sites for detailed site characterization. These sites were located in Nemaha, Nuckolls and Boyd Counties. One year later the Boyd County site was selected as the preferred site and additional site characterization studies were undertaken. On July 29, 1990, US Ecology submitted a license application to the Nebraska Department of Environmental Control (now Department of Environmental Quality-NDEQ). This paper will present issues that the NDEQ has dealt with since Nebraska`s selection as the host state for the CIC facility.

  6. Application of PLUTO Test Facility for U. S. NRC Licensing of a Fuel Assembly

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Dongseok; Shin, Changhwan; Lee, Kanghee; Kang, Heungseok [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    The fuel assembly of the PLUS-7 loaded in the APR-1400 follows the same schedule. Meanwhile, In July 1998, the U.S. NRC adopted a research plan to address the effects of high burnup from a Loss of Coolant Accident (LOCA). From these programs, several important technical findings for rule revision were obtained. Based on the technical findings, the U. S. NRC has amended the 10 CFR 50.46 which will be proclaimed sooner or later. Through the amendment, a LOCA analysis on the fuel assembly has to show the safety at both a fresh and End of Life (EOL) state. The U. S. NRC has already required EOL effects on seismic/LOCA performance for a fuel assembly since 1998. To obtain U.S NRC licensing of a fuel assembly, based on the amendment of 10CFR50.46, a LOCA analysis of the fuel assembly has to show safety both fresh and EOL states. The proper damping factor of the fuel assembly measured at the hydraulic test loop for a dynamic model in a LOCA and a seismic analysis code are at least required. In this paper, we have examined the damping technologies and compared the test facility of PLUTO with others in terms of performance. PLUTO has a better performance on the operating conditions than any others.

  7. Application of project management in technology improvement of Qinshan III

    International Nuclear Information System (INIS)

    Liu Xiaonian

    2008-01-01

    During the operation of Qinshan III, many engineering modifications and renovation projects are being carried out. Advanced international project management methodologies accustomed to the policy and organizational characteristics of TQNPC were applied to the management of these projects. After practical application and development of these methodologies, the company finally sets up its own classification of project management system. The project management system is introduced and discussed for its evolving direction in this paper. (authors)

  8. APPLICATION OF PROJECT MANAGEMENT APPROACHES AT A SMALL BUSINESSES ENTERPRISES

    OpenAIRE

    Sergey V. Rajewski

    2016-01-01

    This article discusses the types of organizational structures of project management and their application in project management in small and medium-sized enterprises. Among the approaches and methods to organize projects emphasizing project management as part of the existing functional structure of the enterprise. Analyzed the most relevant organizational tools of project management in small business: a network schedule; matrix distribution of administrative and management tasks of the projec...

  9. Dealing with the current permissibility application for constructing a spent fuel DGR in Sweden. SKB's license applications for a spent fuel repository

    International Nuclear Information System (INIS)

    Olsson, Olle

    2014-01-01

    The nuclear power utilities in Sweden were in 1976 obliged to demonstrate a safe method for final disposal of spent fuel in order to start operation of new reactors. This initiated a comprehensive research, development and demonstration programme and the development of the KBS-method for final disposal. A new Nuclear Activities Act in 1984 gave the reactor owners full technical and financial responsibility for the waste. They gave in turn SKB the responsibility for all nuclear waste management. Reprocessing was no longer required and direct disposal of the spent fuel has, since then, been the main alternative. Alternative methods for final disposal have been evaluated and compared to the KBS-3-method but it has remained the preferred alternative. A comprehensive research, development and demonstration programme to strengthen the scientific basis and to refine the KBS-3-method has been operated by SKB since then. The site selection process for the final repository for spent nuclear fuel was initiated in 1992. The work included general siting studies at the national and the municipal level and in 2002, SKB initiated site investigations for siting of a final repository on two sites: the Simpevarp and Laxemar areas and the Forsmark area. At the same time, the work on preparing license applications to construct and operate an encapsulation plant and a final repository for spent fuel was started. In June 2009, SKB announced Forsmark as the selected site for the final repository. This paper reviews the applicable legislation and describes the license application, the licensing review and the preparations for implementation

  10. Application of the graded management approach to Battelle's nuclear project

    International Nuclear Information System (INIS)

    Voth, C.B.

    1996-01-01

    Battelle's graded management approach provides an effective and efficient method to perform the Battelle Columbus Laboratories Decommissioning Project (BCLDP). The project is managed by Battelle under their US Nuclear Regulatory Commission (NRC) license but is partially funded by the US Department of Energy (DOE) on a cost-shared basis. Battelle's graded management approach adheres to the regulations and orders governing the BCLDP by the interaction of various plans, procedures, permits, and work instructions. By independent assessment, quality control, and worker training, Battelle has been able to establish a cost-effective approach to performing work and, at the same time, have a controlled checks and balance system to assure the proper safety considerations and project particulars are taken into account

  11. Project Integration Architecture: Inter-Application Propagation of Information

    Science.gov (United States)

    Jones, William Henry

    2005-01-01

    A principal goal of the Project Integration Architecture (PIA) is to facilitate the meaningful inter-application transfer of application-value-added information. Such exchanging applications may be largely unrelated to each other except through their applicability to an overall project; however, the PIA effort recognizes as fundamental the need to make such applications cooperate despite wide disparaties either in the fidelity of the analyses carried out, or even the disciplines of the analysis. This paper discusses the approach and techniques applied and anticipated by the PIA project in treating this need.

  12. 78 FR 29391 - Luminant Generation Company, LLC; Combined License Application for Comanche Peak Nuclear Power...

    Science.gov (United States)

    2013-05-20

    ... only temporary relief from the applicable regulation and the licensee has made good faith efforts to... only temporary relief from the regulations of 10 CFR 50.71(e)(3)(iii). Luminant has made good faith... applicable regulation and the licensee has made good faith efforts to comply with the regulation'' (10 CFR 50...

  13. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  14. 76 FR 53672 - South Carolina Electric & Gas Company; Notice of Application for Amendment of License and...

    Science.gov (United States)

    2011-08-29

    ..., as stated by the licensee, is to assist members of the Columbia Sailing Club in boat launching and... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 516-470] South Carolina... documents (original and eight copies) filed by paper should be sent to: Secretary, Federal Energy Regulatory...

  15. 77 FR 67837 - Callaway Plant, Unit 1; Application for Amendment to Facility Operating License

    Science.gov (United States)

    2012-11-14

    ... methods: Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2012... search, select ``ADAMS Public Documents'' and then select ``Begin Web- based ADAMS Search.'' For problems... INFORMATION CONTACT: Carl F. Lyon, Project Manager, Office of Nuclear Reactor Regulation, U.S. Nuclear...

  16. 78 FR 7818 - Duane Arnold Energy Center; Application for Amendment to Facility Operating License

    Science.gov (United States)

    2013-02-04

    ... methods: Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013... search, select ``ADAMS Public Documents'' and then select ``Begin Web- based ADAMS Search.'' For problems... INFORMATION CONTACT: Karl D. Feintuch, Project Manager, Office of Nuclear Reactor Regulation, U.S. Nuclear...

  17. 75 FR 55317 - Central Vermont Public Service Corporation; Notice of Application for Amendment of License and...

    Science.gov (United States)

    2010-09-10

    ... approval to replace the existing Unit 1 turbine, with a hydraulic capacity of 162 cfs and a nameplate capacity of 1,100 kW, with a new turbine unit having a hydraulic capacity of 177 cfs and a nameplate capacity of 1,451 kW. The replacement of the Unit 1 turbine will increase the total project generation from...

  18. 18 CFR 4.107 - Contents of application for exemption from licensing.

    Science.gov (United States)

    2010-04-01

    ... type of each hydraulic turbine of the small hydroelectric power project. (4) A description of how the... head of the power plant; (iii) The hydraulic capacity of each turbine of the power plant (flow through... capacity if the hydraulic capacity of proposed generating unit(s) plus the minimum flow requirements, if...

  19. 76 FR 67723 - CRD Hydroelectric, LLC; Notice of Application To Amend License and Accepted for Filing...

    Science.gov (United States)

    2011-11-02

    ... two turbine/generator units rather than the previously approved three units. The applicant does not propose any change to the authorized installed capacity or maximum hydraulic capacity. l. Locations of the...

  20. Application of PRINCE2 Project Management Methodology

    Directory of Open Access Journals (Sweden)

    Vaníčková Radka

    2017-09-01

    Full Text Available The methodology describes the principle of setting a project in PRINCE2 project management. The main aim of the paper is to implement PRINCE2 methodology to be used in an enterprise in the service industry. A partial aim is to choose a supplier of the project among new travel guides. The result of the project activity is a sight-seeing tour/service more attractive for customers in the tourism industry and a possible choice of new job opportunities. The added value of the article is the description of applying the principles, processes and topics of PRINCE2 project management so that they might be used in the field.

  1. Safety and licensing of MOX versus UO2 for BWRs and PWRs: Aspects applicable for civilian and weapons grade Pu

    International Nuclear Information System (INIS)

    Goldstein, L.; Malone, J.

    2000-01-01

    This paper reviews the safety and licensing differences between MOX and UO 2 BWR and PWR cores. MOX produced from the normal recycle route and from weapons grade material are considered. Reload quantities of recycle MOX assemblies have been licensed and continue to operate safely in European LWRs. In general, the European MOX assemblies in a reload are 2 . These studies indicated that no important technical or safety related issues have evolved from these studies. The general specifications used by fuel vendors for recycled MOX fuel and core designs are as follows: MOX assemblies should be designed to minimize or eliminate local power peaking mismatches with co-resident and adjacently loaded UO 2 assemblies. Power peaking at the interfaces arises from different neutronic behavior between UO 2 and MOX assemblies. A MOX core (MOX and UO 2 or all-MOX assemblies) should provide cycle energy equivalent to that of an all-UO 2 core. This applies, in particular, to recycle MOX applications. An important consideration when burning weapons grade material is rapid disposition which may not necessarily allow for cycle energy equivalence. The reactivity coefficients, kinetics data, power peaking, and the worth of shutdown systems with MOX fuel and cores must be such to meet the design criteria and fulfill requirements for safe reactor operation. Both recycle and weapons grade plutonium are considered, and positive and negative impacts are given. The paper contrasts MOX versus UO 2 with respect to safety evaluations. The consequences of some transients/accidents are compared for both types of MOX and UO 2 fuel. (author)

  2. 75 FR 15419 - Notice of Intent To Grant Exclusive License of U.S. Patent Application No. 12/432,842 Filed April...

    Science.gov (United States)

    2010-03-29

    ... Exclusive License of U.S. Patent Application No. 12/432,842 Filed April 30, 2009 Entitled: ``A Soil Stabilization Soil Comprising Same, and a Method of Stabilizing Soil'' AGENCY: Department of the Army, U.S. Army... climates with sandy, gravelly soils where emulsions and hydraulic cements will not effectively cure. If...

  3. Systems engineering and the licensing of Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kulesa, T., E-mail: tkulesa@us.ibm.com [IBM, Philidelphia, Pennsylvania (United States); Soderholm, K., E-mail: Kristiina.Soderholm@fortum.com [Fortum Power (Finland); Fechtelkotter, P., E-mail: pfech@us.ibm.com [IBM, Boston, Massacheusets (United States)

    2014-07-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  4. Systems engineering and the licensing of Small Modular Reactors

    International Nuclear Information System (INIS)

    Kulesa, T.; Soderholm, K.; Fechtelkotter, P.

    2014-01-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  5. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    Science.gov (United States)

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  6. A review of tritium licensing requirements

    International Nuclear Information System (INIS)

    Meikle, A.B.

    1982-12-01

    Present Canadian regulations and anticipated changes to these regulations relevant to the utilization of tritium in fusion facilities and in commercial applications have been reviewed. It is concluded that there are no serious licensing obstacles, but there are a number of requirements which must be met. A license will be required from Atomic Energy Control Board if Ontario Hydro tritium is to be applied by other users. A license is required from the Federal Government to export or import tritium. A licensed container will be required for the storage and shipping of tritium. The containers being designed by AECL and Ontario Hydro and which are currently being tested will adequately store and ship all of the Ontario Hydro tritium but are unnecessarily large for the small quantities required by the commercial tritium users. Also, some users may prefer to receive tritium in gaseous form. An additional, smaller container should be considered. The licensing of overseas fusion facilities for the use of tritium is seen as a major undertaking offering opportunities to Canadian Fusion Fuels Technology Project to undertake health, safety and environmental analysis on behalf of these facilities

  7. NRC Licensing Status Summary Report for NGNP

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kinsey, James Carl [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  8. Application of the Theory of Constraints in Project Based Structures

    Directory of Open Access Journals (Sweden)

    Martynas Sarapinas

    2011-04-01

    Full Text Available The article deals with the application of the Theory of Constraints (TOC in project management. This article involves a short introduction to TOC as a project management method and deep analysis of project management specialties using the TOC: TOC based project planning, timetable management, tasks synchronization, project control and “relay runner work ethic”. Moreover, the article describes traditional and TOC based project management theories in their comparison, and emphasize the main benefits we received as the results of the study. Article in Lithuanian

  9. 77 FR 9998 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2012-02-21

    ... more conservative values that incorporate measurement uncertainty. Additionally, one of the operating..., in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to... purpose of the adjudicatory filings and would constitute a Fair Use application, participants are...

  10. 77 FR 28372 - South Carolina Public Service Authority; Notice of Application for Amendment of License and...

    Science.gov (United States)

    2012-05-14

    ... documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions... marina, fuel and sewage pump-out services, restrooms, parking, shops, restaurant, swimming pool, rental cottages, boardwalk, wooden deck, and remote parking for boat trailers. l. Locations of the Application: A...

  11. 76 FR 3927 - Ameren Missouri; Combined License Application for Callaway Plant Unit 2; Exemption

    Science.gov (United States)

    2011-01-21

    ... public health or safety, and are consistent with the common defense and security; and (2) special... only temporary relief from the applicable regulation and the licensee has made good faith efforts to... good faith efforts to comply with 10 CFR 50.71(e)(3)(iii) by submitting Revision 1 to the COL...

  12. 77 FR 76539 - Ameren Missouri; Combined License Application For Callaway Plant, Unit 2; Exemption

    Science.gov (United States)

    2012-12-28

    ... present an undue risk to public health or safety, and are consistent with the common defense and security... regulation and the licensee or applicant has made good faith efforts to comply with the regulation'' (10 CFR... good faith efforts to comply with 10 CFR 50.71(e)(3)(iii) by submitting Revision 1 to the COL...

  13. 77 FR 63301 - Juneau Hydropower, Inc.; Notice of Draft License Application and Preliminary Draft Environmental...

    Science.gov (United States)

    2012-10-16

    .... 791(a)-825(r). h. Applicant Contact: Duff Mitchell, Business Manager, Juneau Hydropower, Inc., P.O... information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnline... access the document. For assistance, contact FERC Online Support. You may also register online at http...

  14. 76 FR 18801 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-04-05

    ... request: The proposed change would revise the application of Risk-Managed Technical Specifications (RMTS) to Technical Specification (TS) 3.7.7, ``Control Room Makeup and Cleanup Filtration System.'' This... change allows the Configuration Risk Management Program (CRMP) to be applied to Technical Specification...

  15. Viability Assessment of a Repository at Yucca Mountain. Volume 4: License Application Plan and Costs

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

  16. The PRINCE Project and its Applications- VERSION2

    OpenAIRE

    Bescos, Sylvie; Bisière, Christophe; Gailly, Pierre-Joseph; Krautter, Wolfgang

    1992-01-01

    The Esprit project Prince aims at development of an industrial Constraint Logic Programing environment based on the Prolog III language. In parallel, the current technology is being validated within the project on representative real-world examples. This paper describes the current status of the three application domains which were Selected to demonstrate the applicability and usefulness of CLP. These applications deal with industrial systems engineering, medium term banking planning and jobs...

  17. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  18. Marble Hill Nuclear Generating Station, Units 1 and 2. License application, PSAR, general information

    International Nuclear Information System (INIS)

    1975-01-01

    An application is presented for two PWR reactors to be constructed in Salud Township, Jefferson County, Indiana, about six miles northeast of New Washington on the Ohio River. Each unit will have a rated core power level of 3411 MW(t) with a corresponding electrical output of 1130 MW(e). Mechanical draft cooling towers will be provided. The facility, which will replicate the Byron facility will be employed for the generation of electricity for transmission, sale for resale, and distribution

  19. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  20. Edwin I. Hatch Nuclear Plant, Unit 2. License application, general information

    International Nuclear Information System (INIS)

    1975-01-01

    An application for a direct cycle BWR is presented. The reactor will be located about 11 miles north of Baxley, Ga., near the south bank of the Ultamaha River in Appling County close to Hatch-1 Reactor. The core thermal power level will be 2537 MW(t) and the electrical power level will be 795 MW(e). Mechanical cooling towers will be utilized

  1. Licensing in BE system code calculations. Applications and uncertainty evaluation by CIAU method

    International Nuclear Information System (INIS)

    Petruzzi, Alessandro; D'Auria, Francesco

    2007-01-01

    The evaluation of uncertainty constitutes the necessary supplement of Best Estimate (BE) calculations performed to understand accident scenarios in water cooled nuclear reactors. The needs come from the imperfection of computational tools on the one side and from the interest in using such tool to get more precise evaluation of safety margins. In the present paper the approaches to uncertainty are outlined and the CIAU (Code with capability of Internal Assessment of Uncertainty) method proposed by the University of Pisa is described including ideas at the basis and results from applications. Two approaches are distinguished that are characterized as 'propagation of code input uncertainty' and 'propagation of code output errors'. For both methods, the thermal-hydraulic code is at the centre of the process of uncertainty evaluation: in the former case the code itself is adopted to compute the error bands and to propagate the input errors, in the latter case the errors in code application to relevant measurements are used to derive the error bands. The CIAU method exploits the idea of the 'status approach' for identifying the thermal-hydraulic conditions of an accident in any Nuclear Power Plant (NPP). Errors in predicting such status are derived from the comparison between predicted and measured quantities and, in the stage of the application of the method, are used to compute the uncertainty. (author)

  2. Microgravity science and applications projects and payloads

    Science.gov (United States)

    Crouch, R. K.

    1987-01-01

    An overview of work conducted by the Microgravity Science and Applications Division of NASA is presented. The goals of the program are the development and implementation of a reduced-gravity research, science and applications program, exploitation of space for human benefits, and the application of reduced gravity research for the development of advanced technologies. Space research of fluid dynamics and mass transport phenomena is discussed and the facilities available for reduced gravity experiments are presented. A program for improving communication with the science and applications communities and the potential use of the Space Station for microgravity research are also examined.

  3. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Eugene S. Grecheck

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  4. Technical specifications, South Texas Project, Unit No. 1 (Docket No. 50-498): Appendix ''A'' to License No. NPF-71

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents specifications for the South Texas Project, Unit No. 1 concerning: safety limits, and limiting safety system settings; limiting conditions for operation and surveillance requirements; design features; and administrative controls

  5. Presentation summary, safety design aspects and U.S. licensing challenges of the pebble bed modular reactor

    International Nuclear Information System (INIS)

    Sproat, Ward; Slabber, Johan

    2001-01-01

    This presentation consists of three sections: An overview of the status of the PBMR project in South Africa, a review of the design features and philosophy being utilized to design the PBMR, and a summary of the key licensing issues that Exelon has identified in assessing the licensability of the PBMR for application in this country

  6. Projection display technology for avionics applications

    Science.gov (United States)

    Kalmanash, Michael H.; Tompkins, Richard D.

    2000-08-01

    Avionics displays often require custom image sources tailored to demanding program needs. Flat panel devices are attractive for cockpit installations, however recent history has shown that it is not possible to sustain a business manufacturing custom flat panels in small volume specialty runs. As the number of suppliers willing to undertake this effort shrinks, avionics programs unable to utilize commercial-off-the-shelf (COTS) flat panels are placed in serious jeopardy. Rear projection technology offers a new paradigm, enabling compact systems to be tailored to specific platform needs while using a complement of COTS components. Projection displays enable improved performance, lower cost and shorter development cycles based on inter-program commonality and the wide use of commercial components. This paper reviews the promise and challenges of projection technology and provides an overview of Kaiser Electronics' efforts in developing advanced avionics displays using this approach.

  7. 78 FR 53712 - Surface Transportation Project Delivery Program Application Requirements

    Science.gov (United States)

    2013-08-30

    ... application, and discussion of classes of multimodal projects that may be best handled on a case-by-case basis... submissions; a paragraph discussing the joint application process; and a paragraph authorizing the Agencies to... early enough to allow for a joint application of the Secretary's responsibilities before the...

  8. Licensing of New Nuclear Power Plants in Canada

    International Nuclear Information System (INIS)

    Schwarz, Garry; Miller, Doug

    2011-01-01

    The regulatory process for new power plant licensing in Canada, from receipt of the initial application to commercial operation, can be divided into three phases: - Environmental Assessment (EA) and License to Prepare Site; - License to Construct; and - License to Operate. The Nuclear Safety and Control Act (NSCA) does not have provisions for combined licenses for site preparation, construction, or operation. Separate licenses must, therefore, be granted for each phase, and would be issued in sequence. However, applications to prepare a site, to construct and to operate a new nuclear power plant could be assessed in parallel. The total duration from the application for the License to Prepare Site to the issuance of the License to Operate (which is a prerequisite for first fuel load) has been established as 9 years subject to certain factors. To help facilitate this timeline, the CNSC has undertaken an aggressive program of documenting regulatory practices, requirements and guidance to assist applicants in submitting complete applications. Working level procedures to assist CNSC staff in their review of submissions are also under development. Extensive program and project management has been introduced to ensure that timelines will be achieved. In parallel with the above activities, regulatory oversight measures to be employed during site preparation activities and plant construction and commissioning are also being developed. On the international front, the CNSC is participating in the MDEP program to leverage the resources and knowledge of other national regulatory authorities in reviews the CNSC is undertaking. The CNSC also participates in IAEA and other international activities to utilize/adapt international practices as appropriate in Canada. (authors)

  9. Integrated ground-water monitoring strategy for NRC-licensed facilities and sites: Case study applications

    Science.gov (United States)

    Price, V.; Temples, T.; Hodges, R.; Dai, Z.; Watkins, D.; Imrich, J.

    2007-01-01

    This document discusses results of applying the Integrated Ground-Water Monitoring Strategy (the Strategy) to actual waste sites using existing field characterization and monitoring data. The Strategy is a systematic approach to dealing with complex sites. Application of such a systematic approach will reduce uncertainty associated with site analysis, and therefore uncertainty associated with management decisions about a site. The Strategy can be used to guide the development of a ground-water monitoring program or to review an existing one. The sites selected for study fall within a wide range of geologic and climatic settings, waste compositions, and site design characteristics and represent realistic cases that might be encountered by the NRC. No one case study illustrates a comprehensive application of the Strategy using all available site data. Rather, within each case study we focus on certain aspects of the Strategy, to illustrate concepts that can be applied generically to all sites. The test sites selected include:Charleston, South Carolina, Naval Weapons Station,Brookhaven National Laboratory on Long Island, New York,The USGS Amargosa Desert Research Site in Nevada,Rocky Flats in Colorado,C-Area at the Savannah River Site in South Carolina, andThe Hanford 300 Area.A Data Analysis section provides examples of detailed data analysis of monitoring data.

  10. A model record of technologies for use in a compatible projects for environmental licensing of wind farms; Um modelo de registro das tecnologias para uso na compatibilizacao de projetos para licenciamento ambiental de parques eolicos

    Energy Technology Data Exchange (ETDEWEB)

    Tavares Junior, Wandemberg; Oliveira, Lucia Maria Barbosa [Universidade de Fortaleza (UNIFOR), CE (Brazil)

    2008-07-01

    This article presents the development of a model for survey and registration of technologies that can be inserted in the process of reconciliation of the subjects of the project for environmental licensing of wind farms. It was used a basis for the theoretical model of the Simultaneous Engineering and Failure Mode and Effect Analysis - FMEA. Given the importance that the wind has for the pursuit of sustainable development, this work had as its main objective to contribute to the reduction of negative indices, proposing improvements to the process of project for environmental licensing of wind farms. (author)

  11. Guide to request license for teletherapy practice

    International Nuclear Information System (INIS)

    2000-01-01

    In this work the steps to request license for teletherapy practice are described , among these steps they it continued it plows to request the qualified personnel's yams, the operation authorization, application purpose, license type

  12. List of Nuclear Materials Licensing Actions Received

    Data.gov (United States)

    Nuclear Regulatory Commission — A catalog of all Materials Licensing Actions received for review. The catalog lists the name of the entity submitting the license application, their city and state,...

  13. Licensing of ANSTO's Replacement Research Reactor

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Garea, V.

    2003-01-01

    This paper presents a general description of the licensing of the 20 MW Pool-type Replacement Research Reactor (RRR) currently being built by the Australian Nuclear Science and Technology Organisation (ANSTO) at their Lucas Heights site. The following aspects will be addressed: 1) The influence of ARPANSA's (the Australian regulator) Regulatory Assessment Principles and Design Criteria on the design of the RRR. 2) The Site Licence Application, including the EIS and the supporting siting documentation. 3) The Construction Licence Application, including the PSAR and associated documentation. 4) The review process, including the IAEA Peer Review and the Public Submissions as well as ARPANSA's own review. 5) The interface between ANSTO, INVAP and ARPANSA in relation to the ongoing compliance with ARPANS Regulation 51 and 54. 6) The future Operating Licence Application, including the draft FSAR and associated documentation. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and how the licensing and regulatory regime within Australia influenced the design of the RRR. In particular, the safety design features that have been incorporated as a result of the specific requirements of ANSTO and the Australian regulator will be briefly described. The paper will close with a description of how the RRR meets, and in many aspects exceeds the requirements of ANSTO and the Australian regulator. (author)

  14. 75 FR 4571 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-01-28

    .... Applications: Therapies for tumors associated with NF1 (including brain and peripheral nervous system tumors...-US-01). Licensing Status: Available for licensing. Licensing Contact: Patrick P. McCue, Ph.D.; 301...

  15. Multiscale Model Simulations of Temperature and Relative Humidity for the License Application of the Proposed Yucca Mountain Repository

    Science.gov (United States)

    Buscheck, T.; Glascoe, L.; Sun, Y.; Gansemer, J.; Lee, K.

    2003-12-01

    ; these variables are determined every 20 m for each emplacement drift in the repository. The MSTHM accounts for 3-D drift-scale and mountain-scale heat flow and captures the influence of the key engineering-design variables and natural-system factors affecting TH conditions in the emplacement drifts and adjoining host rock. Presented is a synopsis of recent MSTHM calculations conducted to support the Total System Performance Assessment for the License Application (TSPA-LA). This work was performed under the auspices of the U.S. Department of Energy by University of California Lawrence Livermore National Laboratory under contract No. W-7405-Eng-48.

  16. Clinch River Breeder Reactor Plant. License application, statement of general information

    International Nuclear Information System (INIS)

    1975-01-01

    Application is made for a reactor facility consisting of a liquid metal cooled reactor and steam generator system, a steam turbine driven electric generating system, electrical switchyard, and related auxiliaries and supporting structures. The primary system is located in an inert atmosphere in shielded vaults within a containment structure. Sodium coolant is used to remove heat from the core and radial blanket. Heat from the primary sodium is transferred in heat exchangers to non radioactive sodium which is used to convert feed-water into steam which is superheated to drive a tandem-compound generator. A single shaft multi-stage turbine generator produces 380 MW(e) with steam conditions of 1450 psig at 900 0 F. Fuel is sintered ceramic pellets of mixed uranium-plutonium oxides encapsulated in stainless steel. There are 198 fuel assemblies with each assembly consisting of 217 fuel rods placed in a hexagonal channel. Plutonium enrichment ranges from 1817 to 32.0 percent by weight. Axial blanket sections contain depleted UO 2 with 99.8 percent 238 U and 0.2 percent 235 U by weight. The proposed location of the plant is within the corporate limits of the city of Oak Ridge in Roane County, Tennessee. (U.S.)

  17. Clinical application analysis of andrographolide total ester sulfonate injection, a traditional Chinese medicine licensed in China.

    Science.gov (United States)

    Zhao, Ying; Huang, Pu; Chen, Zhe; Zheng, Si-Wei; Yu, Jin-Yang; Shi, Chen

    2017-04-01

    Andrographolide total ester sulfonate (ATES) injection is one of the products of traditional Chinese medicine (TCM) currently used against viral infection in China. ATES injection was approved for manufacturing and marketing in January 2002. It is indicated for acute respiratory infections, tonsillitis, chronic obstructive pulmonary disease, influenza, foot and mouth disease, bronchiolitis, herpangina, mumps, infectious mononucleosis and psychosis. However, its usage also carries risk. We investigated the use of ATES at the Wuhan Union Hospital from January 2014 to December 2014 and evaluated its real-world clinical application using the hospital centralized monitoring method. A total of 848 cases were enrolled in this study. In these cases, it was mainly used for postoperative anti-inflammation and treating upper respiratory infection, pneumonia and bronchitis. Among them, 39.86% were contraindicated. Irregular medication of adults and children accounted for 1.91% and 23.38%, respectively. Improper choice of solvent accounted for 3.18%. The choice of intravenous drip versus aerosol inhalation was reasonable. A case of adverse events (AEs) was observed in the monitoring period, and the incidence of adverse drug reaction (ADR) of ATES injection was 0.12%. ATES injection in our hospital is relatively safe with a low incidence of adverse reactions. The study assesses the clinical usage and adverse reactions of ATES injection, and provides suggestions for rational use in clinical practice.

  18. Licensing safety critical software

    International Nuclear Information System (INIS)

    Archinoff, G.H.; Brown, R.A.

    1990-01-01

    Licensing difficulties with the shutdown system software at the Darlington Nuclear Generating Station contributed to delays in starting up the station. Even though the station has now been given approval by the Atomic Energy Control Board (AECB) to operate, the software issue has not disappeared - Ontario Hydro has been instructed by the AECB to redesign the software. This article attempts to explain why software based shutdown systems were chosen for Darlington, why there was so much difficulty licensing them, and what the implications are for other safety related software based applications

  19. Selecting Map Projections in Minimizing Area Distortions in GIS Applications

    Directory of Open Access Journals (Sweden)

    Ahmet Kaya

    2008-12-01

    Full Text Available Varioussoftware for Geographical Information Systems (GISs have been developed and used in many different engineering projects. In GIS applications, map coverage is important in terms of performing reliable and meaningful queries. Map projections can be conformal, equal-area and equidistant. The goal of an application plays an important role in choosing one of those projections. Choosing the equal-area projection for an application in which area information is used (forestry, agriculture, ecosystem etc reduces the amount of distortion on the area, but many users using GIS ignore this fact and continue to use applications with present map sheets no matter in what map projection it is. For example, extracting area information from data whose country system’s map sheet is in conformal projection is relatively more distorted, compared to an equal-area projection one. The goal of this study is to make the best decision in choosing the most proper equal-area projection among the choices provided by ArcGIS 9.0, which is a popular GIS software package, and making a comparison on area errors when conformal projection is used. In this study, the area of parcels chosen in three different regions and geographic coordinates and whose sizes vary between 0.01 to 1,000,000 ha are calculated according to Transversal Mercator (TM, 3°, Universal Transversal Mercator (UTM, 6° and 14 different equal-area projections existing in the ArcGIS 9.0 GIS software package. The parcel areas calculated with geographical coordinates are accepted as definite. The difference between the sizes calculated according to projection coordinates and real sizes of the parcels are determined. Consequently, the appropriate projections are decided for the areas smaller and equal than 1,000 ha and greater than 1,000 ha in the GIS software package.

  20. Application of value engineering technique in construction project

    International Nuclear Information System (INIS)

    Chen Changbing

    2003-01-01

    The author introduces how to apply the theories and methods of the value engineering in construction project. In the construction of a test device of the thermal hydrodynamic process, the authors have greatly reduced the construction cost and shortened the construction period by using the value engineering analyzing method. The application of value engineering in the project management is innovative. This practice indicates that the value engineering is important in many construction projects

  1. Trends in CANDU licensing

    International Nuclear Information System (INIS)

    Snell, V.G.; Grant, S.D.

    1997-01-01

    Modern utilities view nuclear power more and more as a commodity - it must compete 'today' with current alternatives to attract their investment. With its long construction times and large capital investment, nuclear plants are vulnerable to delays once they have been committed. There are two related issues. Where the purchaser and the regulator are experienced in CANDU, the thrust is a very practical one: to identify and resolve major licensing risks at a very early stage in the project. Thus for a Canadian project, the designer (AECL) and the prospective purchaser would deal directly with the AECB. However CANDU has also been successfully licensed in other countries, including Korea, Romania, Argentina, India and Pakistan. Each of these countries has its own regulatory agency responsible for licensing the plant. In addition, however, the foreign customer and regulator may seek input from the AECB, up to and including a statement of licensability in Canada; this is not normally needed for a ''repeat'' plant and/or if the customer is experienced in CANDU, but can be requested if the plant configuration has been modified significantly from an already-operating CANDU. It is thus the responsibility of the designer to initiate early discussions with the AECB so the foreign CANDU meets the expectations of its customers

  2. Research Applications for Teaching (RAFT) Project. Final Report.

    Science.gov (United States)

    Thomson, James R., Jr.; Handley, Herbert M.

    A report is given of the development and progress of the Research Applications for Teaching (RAFT) project, developed at Mississippi State University. Based upon research findings relative to effective teaching and effective schooling, five curriculum modules were prepared and implemented in instruction. In the second year of the project the…

  3. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  4. Software licenses: Stay honest!

    CERN Multimedia

    Computer Security Team

    2012-01-01

    Do you recall our article about copyright violation in the last issue of the CERN Bulletin, “Music, videos and the risk for CERN”? Now let’s be more precise. “Violating copyright” not only means the illegal download of music and videos, it also applies to software packages and applications.   Users must respect proprietary rights in compliance with the CERN Computing Rules (OC5). Not having legitimately obtained a program or the required licenses to run that software is not a minor offense. It violates CERN rules and puts the Organization at risk! Vendors deserve credit and compensation. Therefore, make sure that you have the right to use their software. In other words, you have bought the software via legitimate channels and use a valid and honestly obtained license. This also applies to “Shareware” and software under open licenses, which might also come with a cost. Usually, only “Freeware” is complete...

  5. Current status of construction license of PEFP

    International Nuclear Information System (INIS)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T.

    2012-01-01

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically

  6. Projecting LED product life based on application

    Science.gov (United States)

    Narendran, Nadarajah; Liu, Yi-wei; Mou, Xi; Thotagamuwa, Dinusha R.; Eshwarage, Oshadhi V. Madihe

    2016-09-01

    LED products have started to displace traditional light sources in many lighting applications. One of the commonly claimed benefits for LED lighting products is their long useful lifetime in applications. Today there are many replacement lamp products using LEDs in the marketplace. Typically, lifetime claims of these replacement lamps are in the 25,000-hour range. According to current industry practice, the time for the LED light output to reach the 70% value is estimated according to IESNA LM-80 and TM-21 procedures and the resulting value is reported as the whole system life. LED products generally experience different thermal environments and switching (on-off cycling) patterns when used in applications. Current industry test methods often do not produce accurate lifetime estimates for LED systems because only one component of the system, namely the LED, is tested under a continuous-on burning condition without switching on and off, and because they estimate for only one failure type, lumen depreciation. The objective of the study presented in this manuscript was to develop a test method that could help predict LED system life in any application by testing the whole LED system, including on-off power cycling with sufficient dwell time, and considering both failure types, catastrophic and parametric. The study results showed for the LED A-lamps tested in this study, both failure types, catastrophic and parametric, exist. The on-off cycling encourages catastrophic failure, and maximum operating temperature influences the lumen depreciation rate and parametric failure time. It was also clear that LED system life is negatively affected by on-off switching, contrary to commonly held belief. In addition, the study results showed that most of the LED systems failed catastrophically much ahead of the LED light output reaching the 70% value. This emphasizes the fact that life testing of LED systems must consider catastrophic failure in addition to lumen depreciation, and

  7. Environmental Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility: Environmental report

    International Nuclear Information System (INIS)

    1987-04-01

    The Environmental Standard Review Plan (ESRP) (NUREG-1300) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform environmental reviews of environmental reports prepared by applicants in support of license applications to construct and operate new low-level radioactive waste disposal facilities. The individual ESRPs that constitute this document identify the information considered necessary to conduct the review, the purpose and scope of the review, the analysis procedure and evaluation, the formal input to the environmental statement, and the references considered appropriate for each review. The ESRP is intended to ensure quality and uniformity of approach in individual reviews as well as compliance with the National Environmental Policy Act of 1969. In addition, the ESRP will make information about the environmental component of the licensing process more readily available and thereby will serve to improve the understanding of this process among the public, States and regional compacts, and the regulated community

  8. On Helical Projection and Its Application in Screw Modeling

    Directory of Open Access Journals (Sweden)

    Riliang Liu

    2014-04-01

    Full Text Available As helical surfaces, in their many and varied forms, are finding more and more applications in engineering, new approaches to their efficient design and manufacture are desired. To that end, the helical projection method that uses curvilinear projection lines to map a space object to a plane is examined in this paper, focusing on its mathematical model and characteristics in terms of graphical representation of helical objects. A number of interesting projective properties are identified in regard to straight lines, curves, and planes, and then the method is further investigated with respect to screws. The result shows that the helical projection of a cylindrical screw turns out to be a Jordan curve, which is determined by the screw's axial profile and number of flights. Based on the projection theory, a practical approach to the modeling of screws and helical surfaces is proposed and illustrated with examples, and its possible application in screw manufacturing is discussed.

  9. The ESA Space Weather Applications Pilot Project

    Science.gov (United States)

    Glover, A.; Hilgers, A.; Daly, E.

    Following the completion in 2001 of two parallel studies to consider the feasibility of a European Space Weather Programme ESA embarked upon a space weather pilot study with the goal of prototyping European space weather services and assessing the overall market for such within Europe This pilot project centred on a number of targeted service development activities supported by a common infrastructure and making use of only existing space weather assets Each service activity included clear participation from at least one identified service user who was requested to provide initial requirements and regular feedback during the operational phase of the service These service activities are now reaching the end of their 2-year development and testing phase and are now accessible each with an element of the service in the public domain see http www esa-spaceweathet net swenet An additional crucial element of the study was the inclusion of a comprehensive and independent analysis of the benefits both economic and strategic of embarking on a programme which would include the deployment of an infrastructure with space-based elements The results of this study will be reported together with their implication for future coordinated European activities in this field

  10. Towards sentiment analysis application in housing projects

    Science.gov (United States)

    Mahadzir, Nurul Husna; Omar, Mohd Faizal; Nawi, Mohd Nasrun Mohd

    2016-08-01

    In becoming a develop nation by 2020, Malaysia Government realized the need in providing affordable house to the public. Since Second Malaysia Plan, government has implemented various affordable housing projects and it continues until recent Malaysia Plan. To measure the effectiveness of the initiatives taken, public opinion is necessary. A social media platform has been seen as the most effective mechanism to get information on people's thought and feeling towards certain issues. One of the best ways to extract emotions and thoughts from what people post in social media is through Sentiment Analysis (SA). There are three different levels of analysis: document level, sentence level and feature level. Most of previous research focused on the classification of sentiment at document or sentence level. Unfortunately, both document and sentence level does not discover what exactly people like or not. While the analysis based on feature, there exist accuracy problem when classifying the sentiment scores. This paper will propose a new framework that focuses on sentiment classification scores at feature level to overcome the uncertainty and accuracy issues on the result.

  11. Risk Assessment for Current and Projected Uses of Source Material Under a U.S. NRC General License and Exemption Request

    International Nuclear Information System (INIS)

    Smith, Michael A.; Napier, Bruce A.; Strom, Daniel J.; Short, Steven M.; Beatty, Cassandra V.; Stoker, Natasha F.; Newman, Teridee

    2006-01-01

    Source material is used under specific license, general license, and various exemptions from licensing requirements in 10 CFR Part 40. Because the Atomic Energy Act of 1946 focused on source material primarily in terms of its significance to the production of special nuclear material, the initial regulation of source material did not, apparently, give much emphasis to public health and safety. This emphasis on the production of special nuclear material continued in later modifications to the regulations. Because the last major update of these regulations was over 40 years ago (1961), the NRC is concerned that the current regulations for source materials may not be consistent with current health and safety regulations. Current industrial trends indicate a general decline in the use of thorium and uranium. Thorium was traditionally used in ceramics for refractory purposes but now is primarily used in scientific research, in a few electrical applications, as a chemical catalyst, and in optical lenses. Uranium, once popular in pigments and glazes, is now almost entirely limited to military applications that require special licensure and in scientific research. Due to high-disposal costs, increasingly stringent regulations, and public concerns related to the natural radioactivity of source material, industry is rapidly developing substitutes and alternate processes that do not involve the use of uranium and thorium. For these reasons, the downward trend in the use of source material is expected to continue. Researchers at Pacific Northwest National Laboratory (PNNL) identified how source materials meeting the exemption and general license requirements of 10 CFR 40.13(a), 40.13(b), and 40.22 are currently being used in industry and by the public. Based on the results of an extensive literature and internet search, few ?truly? new uses of source material were discovered that were not already considered in or represented by previous NRC analyses. Exceptions were (1) the

  12. Green Applications for Space Power Project

    Science.gov (United States)

    Robinson, Joel (Principal Investigator)

    2014-01-01

    Spacecraft propulsion and power for many decades has relied on Hydrazine monopropellant technology for auxiliary power units (APU), orbital circularization, orbit raising/lowering and attitude control. However, Hydrazine is toxic and therefore requires special ground handling procedures to ensure launch crew safety. The Swedish Company ECAPS has developed a technology based upon the propellant Ammonium Dinitramide (ADN) that offers higher performance, higher density and reduced ground handling support than Hydrazine. This blended propellant is called LMP-103S. Currently, the United States Air Force (USAF) is pursuing a technology based on Hydroxyl Ammonium Nitrate (HAN, otherwise known as AF-M315E) with industry partners Aerojet and Moog. Based on the advantages offered by these propellants, MSFC should explore powering APU's with these propellants. Due to the availability of space hardware, the principal investigator has found a collection of USAF hardware, that will act as a surrogate, which operates on a Hydrazine derivative. The F-16 fighter jet uses H-70 or 30% diluted Hydrazine for an Emergency Power Unit (EPU) which supplies power to the plane. The PI has acquired two EPU's from planes slated for destruction at the Davis Monthan AFB. This CIF will include a partnership with 2 other NASA Centers who are individually seeking seed funds from their respective organizations: Kennedy Space Center (KSC) and Dryden Flight Research Center (DFRC). KSC is preparing for future flights from their launch pads that will utilize green propellants and desire a low-cost testbed in which to test and calibrate new leak detection sensors. DFRC has access to F-16's which can be used by MSFC & KSC to perform a ground test that demonstrates emergency power supplied to the jet. Neither of the green propellant alternatives have been considered nor evaluated for an APU application. Work has already been accomplished to characterize and obtain the properties of these 2 propellants

  13. License plate recognition (phase B).

    Science.gov (United States)

    2010-06-01

    License Plate Recognition (LPR) technology has been used for off-line automobile enforcement purposes. The technology has seen mixed success with correct reading rate as high as 60 to 80% depending on the specific application and environment. This li...

  14. DOE Patents Available for Licensing

    International Nuclear Information System (INIS)

    Stuber, C.

    1981-01-01

    DOE Patents Available for Licensing (DOE PAL) provides abstracting and indexing coverage of the DOE patent literature, including patent applications, that concerns any apsect of energy production, conservation, and utilization. The citations are arranged by subject category. DOE is prepared to grant exclusive or nonexclusive, revocable licenses under DOE-owned US patents and patent applications in accordance with the provisions of 10CFR781

  15. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  16. Application of the New Decommissioning Regulation to the Nuclear Licensed Facilities (NLF) at Fontenay-aux-Roses's Nuclear Center (CEA)

    International Nuclear Information System (INIS)

    Sauret, Josiane; Piketty, Laurence; Jeanjacques, Michel

    2008-01-01

    This abstract describes the application of the new decommissioning regulation on all Nuclear Licensed Facilities (NLF is to say INB in French) at Fontenay-aux-Roses's Center (CEA/FAR). The decommissioning process has been applied in six buildings which are out of the new nuclear perimeter proposed (buildings no 7, no 40, no 94, no 39, no 52/1 and no 32) and three buildings have been reorganized (no 54, no 91 and no 53 instead of no 40 and no 94) in order to increase the space for temporary nuclear waste disposal and to reduce the internal transports of nuclear waste on the site. The advantages are the safety and radioprotection improvements and a lower operating cost. A global safety file was written in 2002 and 2003 and was sent to the French Nuclear Authority on November 2003. The list of documents required is given in the paragraph I of this paper. The main goals were two ministerial decrees (one decree for each NLF) getting the authorization to modify the NLF perimeter and to carry out cleaning and dismantling activities leading to the whole decommissioning of all NLF. Some specific authorizations were necessary to carry out the dismantling program during the decommissioning procedure. They were delivered by the French Nuclear Safety Authority (FNSA) or with limited delegation by the General Executive Director (GED) on the CEA Fontenay-aux-Roses's Center, called internal authorization. Some partial dismantling or decontamination examples are given below: - evaporator for the radioactive liquid waste treatment station (building no 53): FNSA authorization: phase realised in 2002/2003. - disposal tanks for the radioactive liquid waste treatment station (building no 53) FNSA authorization: phase realised in 2004, - incinerator for the radioactive solid waste treatment station (building no 07): FNSA authorization: operation realised in 2004, - research equipments in the building no. 54 and building no. 91: internal authorization ; realised in 2005, - sample

  17. Public participation in the licensing of large-scale projects with environmental impact. The point of view of the population

    International Nuclear Information System (INIS)

    Gloede, F.; Buecker-Gaertner, H.

    1989-01-01

    The paper explains purpose, concept and methods of the poll, the structures of the pattern of opinions given, and th causes of opinion forming and overlapping patterns of orientation. A significant aspect observed is that irrespective of differentiation in the opinion forming process among the regional population, public participation seems to have only little legitimatory effect. Applicants as well as authorities meet with distrust on the part of the public, caused by the (subjective feeling) of discrepany between decision-relevant or 'licence-relevant, and social preferences. There is the common feeling that the interests of the propulation are only sometimes taken into account, and the public's power to influence decisions is very limited. This is why over two thirds of the regional population sees a need for modification of the practical execution of the procedures, and of the legal provisions. (orig./HSCH) [de

  18. Jordan Reactor of Training and Research (JRTR) Licensing Process and Various Challenges of Nuclear Power Project in Jordan

    Energy Technology Data Exchange (ETDEWEB)

    Banisalman, Mosab [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Choi, Kuan Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-05-15

    In Jordan ,Prior to 2001, nuclear activities were handled as a directorate in the Ministry of Energy and Mineral Resources, in 2001, a new law of Nuclear Energy and Radiation Protection (29) was promulgated to substitute for the first law (14/1987), Under this 2001 law the Atomic Energy Commission (JAEC) was established to undertake both promotion and regulation of nuclear applications in the country In July 2007, the 2001 law was modified and divided into two laws allowing the creation of two independent entities: Nuclear Energy Law (42/2007) established the Jordan Atomic Energy Commission (JAEC) and the Nuclear Safety, Security and Radiation Protection Law (43/2007) established the Radiation and Nuclear Regulatory Commission (JNRC) In Feb. 2008 the parliament adopted a further revision to law (42/2007 to upgrade JAEC to the level of a Commission with five commissioners reporting to the PM with the mandate to manage the nuclear program

  19. Current status of construction license of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically.

  20. Application of the NEI 95-10 methodology in the Rcic system of the Unit-1, to implement the criterions of the license renovation rule; (10 Cfr-54)

    International Nuclear Information System (INIS)

    Diaz, A.; Mendoza, G.; Arganis, C.; Viais, J.; Contreras, A.; Fernandez, G.; Medina, G.

    2012-10-01

    In December of 1991, the US National Regulatory Commission (US NRC) published the 10 Cfr-54, to establish the procedures, criterions and necessary requirements for the license renovation of a nuclear power station. In 1994 the US NRC proposed an amendment to these requirements that basically were centered in the effects of the aging in structures and passive components of long life and in the inclusion of Time Limited Aging Analyses (TLAAs). In a general way, is established that the requester should show to the regulator body that the effects of the aging in structures, systems and components are and will be appropriately negotiated or that the TLAAs has been evaluated for the operation extended period. The NEI 95-10 is a guide document developed by the Nuclear Energy Institute (NEI), to provide a focus accepted to cover the requirements of 10 Cfr-54, offering an efficient process that allows to any requester to complete in a practical way the requirements of the License Renovation Rule and to supplement their solicitude. This work presents the application of this guide to the Reactor Core Insulation Cooling (Rcic) of the Unit 1 of the nuclear power plant of Laguna Verde, elect as pilot system to carry out the application of the 10 Cfr-54 following the recommended methodology by the Industrial Guide for the implementation of the License Renovation Rule. (Author)

  1. Digital projection radiography. Technical principles, image properties and potential applications

    International Nuclear Information System (INIS)

    Busch, H.P.

    1999-01-01

    The history of development of digital projection radiography as a diagnostic method is presented in a comprehensive survey. The various technical principles are explained in detail and illustrated by means of graphic figures and digital X-ray pictures. A comparative assessment of currently applied radiographic systems is given and the potential clinical applications of the method of digital projection radiography are discussed. (orig./CB) [de

  2. Attitudes of Registered and Licensed Practical Nurses About the Importance of Families in Surgical Hospital Units: Findings From the Landspitali University Hospital Family Nursing Implementation Project.

    Science.gov (United States)

    Blöndal, Katrin; Zoëga, Sigridur; Hafsteinsdottir, Jorunn E; Olafsdottir, Olof Asdis; Thorvardardottir, Audur B; Hafsteinsdottir, Sigrun A; Sveinsdóttir, Herdis

    2014-08-01

    The purpose of this study was to examine attitudes of registered nurses and licensed practical nurses about the importance of the family in surgical hospital units before (T1) and after (T2) implementation of a Family Systems Nursing educational intervention based on the Calgary Family Assessment and Intervention Models. This study was part of the Landspitali University Hospital Family Nursing Implementation Project and used a nonrandomized, quasi-experimental design with nonequivalent group before and after and without a control group. There were 181 participants at T1 and 130 at T2. No difference was found in nurses' attitudes as measured by the Families Importance in Nursing Care-Nurses' Attitudes (FINC-NA) questionnaire, before and after the educational intervention. Attitudes toward families were favorable at both times. Analysis of demographic variables showed that age, work experience, and workplace (inpatient vs. outpatient units) had an effect on the nurses' attitudes toward families. The influence of work experience on attitudes toward family care warrants further exploration. © The Author(s) 2014.

  3. 76 FR 7847 - Glenn A. Baxter, Application To Renew License for Amateur Radio Service Station K1MAN

    Science.gov (United States)

    2011-02-11

    ... Renew License for Amateur Radio Service Station K1MAN AGENCY: Federal Communications Commission. ACTION... Service Station K1MAN filed by Glenn A. Baxter should be granted. DATES: The document was mailed to the... Amateur Radio Station K1MAN should be granted. As discussed below, the record before us indicates that...

  4. 77 FR 16278 - License Renewal Application for Indian Point Nuclear Generating Units 2 and 3; Entergy Nuclear...

    Science.gov (United States)

    2012-03-20

    ... contacting the NRC about the availability of information regarding this document. You may access information... the Village of Buchanan, New York. The current operating licenses for IP2 and IP3 expire on September... units of measure; (2) a new thermal study that characterizes the thermal plume of cooling water...

  5. Sandia photovoltaic systems definition and application experiment projects

    Energy Technology Data Exchange (ETDEWEB)

    Jones, G.

    1983-04-01

    A compilation is given of the abstracts and visual material used in presentation at the Fourth Photovoltaic Systems Definition and Applications Projects Integration Meeting held at the Marriott Hotel, April 12-14, 1983, in Albuquerque, New Mexico. The meeting provided a forum for detailed analyses on recently completed and current activities. These activities include systems research, balance-of-system technology development, residential experimentation, and evaluation of intermediate-sized applications.

  6. Participation of the public in the licensing of large-scale projects with environmental impact - theoretical framework and project conceptual outline

    International Nuclear Information System (INIS)

    Bechmann, G.; Gloede, F.

    1989-01-01

    The paper discusses the dimensions and environmental impacts of large-scale projects, and public participation as an element of institutionalized problem management. The legal protection functions, the administrative and socio-political functions are subsumed under a concept of function which defines a function as a synthesis of a variety of possibilities, so that different 'achievements' are expected from public participation, depending on the reference system chosen for comparison. The paper explains the purpose of the examination of public participation and its functions, the design of analytical procedure which covers the three main stages of 'input, legal procedure, output', and instruments and aspects such as interdisciplinarity, representativity, comparison, relation between empirical research and the principles of the law. (HSCH) [de

  7. 76 FR 57729 - Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final...

    Science.gov (United States)

    2011-09-16

    ...-015] Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric Project and the Surrender of... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and the...

  8. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  9. The application of TINA in the MESH project

    NARCIS (Netherlands)

    van Sinderen, Marten J.; Ferreira Pires, Luis; Pires, L.F.; Plagemann, Thomas; Goebel, Vera

    1998-01-01

    This paper discusses the application of TINA concepts, architectures and related design paradigms in the MESH project. MESH adopted TINA as a means to facilitate the design and implementation of a flexible platform for developing and providing interactive multimedia services. This paper reports on

  10. Geospatial application of the Water Erosion Prediction Project (WEPP) model

    Science.gov (United States)

    D. C. Flanagan; J. R. Frankenberger; T. A. Cochrane; C. S. Renschler; W. J. Elliot

    2013-01-01

    At the hillslope profile and/or field scale, a simple Windows graphical user interface (GUI) is available to easily specify the slope, soil, and management inputs for application of the USDA Water Erosion Prediction Project (WEPP) model. Likewise, basic small watershed configurations of a few hillslopes and channels can be created and simulated with this GUI. However,...

  11. Application of Markovian model to school enrolment projection ...

    African Journals Online (AJOL)

    Application of Markovian model to school enrolment projection process. VU Ekhosuehi, AA Osagiede. Abstract. No Abstract. Global Journal of Mathematical Sciences Vol. 5(1) 2006: 9-16. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT.

  12. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  13. What it took to get an NRC license for centralized incineration

    International Nuclear Information System (INIS)

    DiSalvo, R.; Zielenbach, W.

    1987-01-01

    In 1982, Battelle joined five other commercial generators of low level radioactive waste in conducting a study of the technical and economic feasibility and the licensability of a central facility for incinerating LLW. The project generated a license application to the USNRC and supporting documentation related to the safety and environmental impacts of the facility. After thorough review, the NRC has issued a Finding of No Significant Impact and the associated license authorization, which is the first of its kind for an incineration facility

  14. Licensing and advanced fuel designs

    International Nuclear Information System (INIS)

    Davidson, S.L.; Novendstern, E.H.

    1991-01-01

    For the past 15 years, Westinghouse has been actively involved in the development and licensing of fuel designs that contain major advanced features. These designs include the optimized fuel assembly, The VANTAGE 5 fuel assembly, the VANTAGE 5H, and most recently the VANTAGE+ fuel assembly. Each of these designs was supported by extensive experimental data, safety evaluations, and design efforts and required intensive interaction with the US Nuclear Regulatory Commission (NRC) during the review and approval process. This paper presents a description of the licensing approach and how it was utilized by the utilities to facilitate the licensing applications of the advanced fuel designs for their plants. The licensing approach described in this paper has been successfully applied to four major advanced fuel design changes ∼40 plant-specific applications, and >350 cycle-specific reloads in the past 15 years

  15. Application for approval of the Cold Lake Expansion Project

    International Nuclear Information System (INIS)

    1997-02-01

    Imperial Oil Resources Limited applied to the Alberta Energy and Utilities Board for approval to expand its operations at Cold Lake, Alberta and to construct and operate an electrical power plant and electrical generator substation. Imperial Oil also applied to the Alberta Environmental Protection Branch to prepare the site for a new central plant for the expansion. The company also requested a short-term groundwater withdrawal permit to provide temporary water supply for start-up. Imperial Oil claims that the project is in the public interests given the project's social, environmental and economic effects. Imperial Oil submitted this 4 volume document in support of their application. The documentation includes a project description, an environmental impact assessment, a biophysical and resource use assessment, a socio-economic assessment, and environmental baseline studies. The project is scheduled for start-up in late 1999 at a total cost of at least $440 million. refs., tabs., figs

  16. Rules for the licensing of new experiments in BR2: application to the test irradiation of new MTR-fuels

    International Nuclear Information System (INIS)

    Joppen, F.

    2000-01-01

    New types of MTR fuel elements are being developed and require a qualification before routine operation could be authorized. During the test irradiation the new fuel elements .are considered as experimental devices and their irradiation is allowed according to the procedures for experiments. Authorization is based on the advice .of a consultative committee on experiments. This procedure is valid as long as the irradiation is covered by the actual reactor license. An additional license or an amendment is only required if due to the experiment the risk for the workers or the environment is increased in a significant way. A few experimental fuel plates loaded in the primary loop of the reactor will not increase this risk. The source term for potential radioactive releases remains more or less the same. The probability for an accident can be limited by restricting the heat flux and surface temperature. (author)

  17. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  18. 75 FR 11151 - Pacific Gas and Electric Company; Notice of Intent To File License Application, Filing of Draft...

    Science.gov (United States)

    2010-03-10

    .... Name of Project: Humboldt WaveConnect Pilot Project. f. Location: The project would be located in the... Preservation Act; and recommending that it begin informal consultation with: (a) The U.S. Fish and Wildlife.... n. The proposed Humboldt WaveConnect Pilot Project would consist of: (1) Wave energy conversion (WEC...

  19. Considerations about the licensing process of special nuclear industrial facilities

    Energy Technology Data Exchange (ETDEWEB)

    Talarico, M.A., E-mail: talaricomarco@hotmail.com [Marinha do Brasil, Rio de Janeiro, RJ (Brazil). Coordenacao do Porgrama de Submarino com Propulsao Nuclear; Melo, P.F. Frutuoso e [Coordenacao dos Programas de Pos-Graduacao em Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Nuclear

    2015-07-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  20. Considerations about the licensing process of special nuclear industrial facilities

    International Nuclear Information System (INIS)

    Talarico, M.A.; Melo, P.F. Frutuoso e

    2015-01-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)