WorldWideScience

Sample records for level hydro-economic model

  1. A Hydro-Economic Model for Water Level Fluctuations: Combining Limnology with Economics for Sustainable Development of Hydropower

    Science.gov (United States)

    Hirsch, Philipp Emanuel; Schillinger, Sebastian; Weigt, Hannes; Burkhardt-Holm, Patricia

    2014-01-01

    Water level fluctuations in lakes lead to shoreline displacement. The seasonality of flooding or beaching of the littoral area affects nutrient cycling, redox gradients in sediments, and life cycles of aquatic organisms. Despite the ecological importance of water level fluctuations, we still lack a method that assesses water levels in the context of hydropower operations. Water levels in reservoirs are influenced by the operator of a hydropower plant, who discharges water through the turbines or stores water in the reservoir, in a fashion that maximizes profit. This rationale governs the seasonal operation scheme and hence determines the water levels within the boundaries of the reservoir's water balance. For progress towards a sustainable development of hydropower, the benefits of this form of electricity generation have to be weighed against the possible detrimental effects of the anthropogenic water level fluctuations. We developed a hydro-economic model that combines an economic optimization function with hydrological estimators of the water balance of a reservoir. Applying this model allowed us to accurately predict water level fluctuations in a reservoir. The hydro-economic model also allowed for scenario calculation of how water levels change with climate change scenarios and with a change in operating scheme of the reservoir (increase in turbine capacity). Further model development will enable the consideration of a variety of additional parameters, such as water withdrawal for irrigation, drinking water supply, or altered energy policies. This advances our ability to sustainably manage water resources that must meet both economic and environmental demands. PMID:25526619

  2. A hydro-economic model for water level fluctuations: combining limnology with economics for sustainable development of hydropower.

    Science.gov (United States)

    Hirsch, Philipp Emanuel; Schillinger, Sebastian; Weigt, Hannes; Burkhardt-Holm, Patricia

    2014-01-01

    Water level fluctuations in lakes lead to shoreline displacement. The seasonality of flooding or beaching of the littoral area affects nutrient cycling, redox gradients in sediments, and life cycles of aquatic organisms. Despite the ecological importance of water level fluctuations, we still lack a method that assesses water levels in the context of hydropower operations. Water levels in reservoirs are influenced by the operator of a hydropower plant, who discharges water through the turbines or stores water in the reservoir, in a fashion that maximizes profit. This rationale governs the seasonal operation scheme and hence determines the water levels within the boundaries of the reservoir's water balance. For progress towards a sustainable development of hydropower, the benefits of this form of electricity generation have to be weighed against the possible detrimental effects of the anthropogenic water level fluctuations. We developed a hydro-economic model that combines an economic optimization function with hydrological estimators of the water balance of a reservoir. Applying this model allowed us to accurately predict water level fluctuations in a reservoir. The hydro-economic model also allowed for scenario calculation of how water levels change with climate change scenarios and with a change in operating scheme of the reservoir (increase in turbine capacity). Further model development will enable the consideration of a variety of additional parameters, such as water withdrawal for irrigation, drinking water supply, or altered energy policies. This advances our ability to sustainably manage water resources that must meet both economic and environmental demands.

  3. A hydro-economic model for water level fluctuations: combining limnology with economics for sustainable development of hydropower.

    Directory of Open Access Journals (Sweden)

    Philipp Emanuel Hirsch

    Full Text Available Water level fluctuations in lakes lead to shoreline displacement. The seasonality of flooding or beaching of the littoral area affects nutrient cycling, redox gradients in sediments, and life cycles of aquatic organisms. Despite the ecological importance of water level fluctuations, we still lack a method that assesses water levels in the context of hydropower operations. Water levels in reservoirs are influenced by the operator of a hydropower plant, who discharges water through the turbines or stores water in the reservoir, in a fashion that maximizes profit. This rationale governs the seasonal operation scheme and hence determines the water levels within the boundaries of the reservoir's water balance. For progress towards a sustainable development of hydropower, the benefits of this form of electricity generation have to be weighed against the possible detrimental effects of the anthropogenic water level fluctuations. We developed a hydro-economic model that combines an economic optimization function with hydrological estimators of the water balance of a reservoir. Applying this model allowed us to accurately predict water level fluctuations in a reservoir. The hydro-economic model also allowed for scenario calculation of how water levels change with climate change scenarios and with a change in operating scheme of the reservoir (increase in turbine capacity. Further model development will enable the consideration of a variety of additional parameters, such as water withdrawal for irrigation, drinking water supply, or altered energy policies. This advances our ability to sustainably manage water resources that must meet both economic and environmental demands.

  4. Large scale hydro-economic modelling for policy support

    Science.gov (United States)

    de Roo, Ad; Burek, Peter; Bouraoui, Faycal; Reynaud, Arnaud; Udias, Angel; Pistocchi, Alberto; Lanzanova, Denis; Trichakis, Ioannis; Beck, Hylke; Bernhard, Jeroen

    2014-05-01

    To support European Union water policy making and policy monitoring, a hydro-economic modelling environment has been developed to assess optimum combinations of water retention measures, water savings measures, and nutrient reduction measures for continental Europe. This modelling environment consists of linking the agricultural CAPRI model, the LUMP land use model, the LISFLOOD water quantity model, the EPIC water quality model, the LISQUAL combined water quantity, quality and hydro-economic model, and a multi-criteria optimisation routine. With this modelling environment, river basin scale simulations are carried out to assess the effects of water-retention measures, water-saving measures, and nutrient-reduction measures on several hydro-chemical indicators, such as the Water Exploitation Index (WEI), Nitrate and Phosphate concentrations in rivers, the 50-year return period river discharge as an indicator for flooding, and economic losses due to water scarcity for the agricultural sector, the manufacturing-industry sector, the energy-production sector and the domestic sector, as well as the economic loss due to flood damage. Recently, this model environment is being extended with a groundwater model to evaluate the effects of measures on the average groundwater table and available resources. Also, water allocation rules are addressed, while having environmental flow included as a minimum requirement for the environment. Economic functions are currently being updated as well. Recent development and examples will be shown and discussed, as well as open challenges.

  5. Hydro-economic modelling in mining catchments

    Science.gov (United States)

    Ossa Moreno, J. S.; McIntyre, N.; Rivera, D.; Smart, J. C. R.

    2017-12-01

    Hydro-economic models are gaining momentum because of their capacity to model both the physical processes related to water supply, and socio-economic factors determining water demand. This is particularly valuable in the midst of the large uncertainty upon future climate conditions and social trends. Agriculture, urban uses and environmental flows have received a lot of attention from researchers, as these tend to be the main consumers of water in most catchments. Mine water demand, although very important in several small and medium-sized catchments worldwide, has received less attention and only few models have attempted to reproduce its dynamics with other users. This paper describes an on-going project that addresses this gap, by developing a hydro-economic model in the upper Aconcagua River in Chile. This is a mountain catchment with large scale mining and hydro-power users at high altitudes, and irrigation areas in a downstream valley. Relevant obstacles to the model included the lack of input climate data, which is a common feature in several mining areas, the complex hydrological processes in the area and the difficulty of quantifying the value of water used by mines. A semi-distributed model developed within the Water Evaluation and Planning System (WEAP), was calibrated to reproduce water supply, and this was complemented with an analysis of the value of water for mining based on two methods; water markets and an analysis of its production processes. Agriculture and other users were included through methods commonly used in similar models. The outputs help understanding the value of water in the catchment, and its sensitivity to changes in climate variables, market prices, environmental regulations and changes in the production of minerals, crops and energy. The results of the project highlight the importance of merging hydrology and socio-economic calculations in mining regions, in order to better understand trade-offs and cost of opportunity of using

  6. Using ecosystem services to represent the environment in hydro-economic models

    Science.gov (United States)

    Momblanch, Andrea; Connor, Jeffery D.; Crossman, Neville D.; Paredes-Arquiola, Javier; Andreu, Joaquín

    2016-07-01

    Demand for water is expected to grow in line with global human population growth, but opportunities to augment supply are limited in many places due to resource limits and expected impacts of climate change. Hydro-economic models are often used to evaluate water resources management options, commonly with a goal of understanding how to maximise water use value and reduce conflicts among competing uses. The environment is now an important factor in decision making, which has resulted in its inclusion in hydro-economic models. We reviewed 95 studies applying hydro-economic models, and documented how the environment is represented in them and the methods they use to value environmental costs and benefits. We also sought out key gaps and inconsistencies in the treatment of the environment in hydro-economic models. We found that representation of environmental values of water is patchy in most applications, and there should be systematic consideration of the scope of environmental values to include and how they should be valued. We argue that the ecosystem services framework offers a systematic approach to identify the full range of environmental costs and benefits. The main challenges to more holistic representation of the environment in hydro-economic models are the current limits to understanding of ecological functions which relate physical, ecological and economic values and critical environmental thresholds; and the treatment of uncertainty.

  7. A Linked Hydro-Economic Model to Examine the Effects of Water Policy on Rural Poverty

    Science.gov (United States)

    Maneta, M. P.; Torres, M.; Vosti, S. A.; Wallender, W. W.; Howitt, R.; Rodrigues, L. N.; Bassoi, L. H.; Pfeiffer, L.; Young, J.

    2006-12-01

    The sustainable intensification of small-scale agriculture is a necessary condition for reducing rural poverty in developing countries. Increasing the amount of irrigated cropland and the economic efficiency of irrigation are two key components of most intensification strategies. Improved access to water generally increases farm income but richer farmers use a disproportionate share of the available water, decreasing the chances of poor farmers to meet their water needs. Furthermore, water and poverty have strong spatial components that have so far been neglected in water planning. In that sense, too little is known about the short and long term hydrological effects, especially the externality effects of changes in on-farm water use and its implications to nearby farmers. To address this gap in knowledge, a spatially distributed and transient description of changes in surface and groundwater allocation under different agricultural management scenarios is needed. We propose a hydro-economic model providing a realistic spatio-temporal description of the linkages between the economic and hydrologic subsystems. This hydro-economic model is composed of a basin-level 3D spatially distributed transient hydrologic model (MOD-HMS) and a farm-level, spatially distributed agricultural production model. Both models are explicitly linked through the boundary conditions of the hydrologic model. The linkage will account for the spatial and temporal impact of different crop mixes, irrigation techniques and groundwater pumpage on water availability at farm level to assess the effects of policy action on the hydro-economic components of the system.

  8. The different modes of hydro-economic analysis (Invited)

    Science.gov (United States)

    Harou, J. J.; Binions, O.; Erfani, T.

    2013-12-01

    In the face of growing water demands, climate change and spatial and temporal water access variability, accurately assessing the economic impacts of proposed water resource management changes is useful. The objective of this project funded by UK Water Industry Research was to present and demonstrate a framework for identifying and using the ';value of water' to enable water utilities and their regulators to make better decisions. A hydro-economic model can help evaluate water management options in terms of their hydrological and economic impact at different locations throughout a catchment over time. In this talk we discuss three modes in which hydro-economic models can be implemented: evaluative, behavioral and prescriptive. In evaluation mode economic water demand and benefit functions are used to post-process water resource management model results to assess the economic impacts (over space and time) of a policy under consideration. In behavioral hydro-economic models users are represented as agents and the economics is used to help predict their actions. In prescriptive mode optimization is used to find the most economically efficient management actions such as allocation patterns or source selection. These three types of hydro-economic analysis are demonstrated on a UK watershed (Great River Ouse) that includes 97 different water abstractors from amongst the public water supply, agriculture, industry and energy plant cooling sectors. The following issues under dry and normal historical conditions were investigated: Supply/demand investment planning, societal cost of environmental flows, water market prices, and scarcity-sensitive charges for water rights. The talk discusses which hydro-economic modeling mode is used to study each of these issues and why; example results are shown and discussed. The topic of how hydro-economic models can be built and deployed effectively is covered along with how existing water utility operational and planning tools can be

  9. Using hydro-economic modelling to investigate trade-offs between ecological and economic water management objectives

    DEFF Research Database (Denmark)

    Riegels, Niels

    is that land and water use levels predicted by the two approaches are essentially the same. The prediction that high-value irrigated crops will not replace low-value crops is not unreasonable given behavior observed in the baseline data set and highlights the limitations of using economic models calibrated......In regions where water scarcity exists, economic analysis can help identify ways to increase benefits of water use. The European Union’s Water Framework Directive (WFD), is an example of a law that requires the use of economic principles, approaches, and instruments in water resources management....... One of these instruments is water pricing. This study develops an approach for implementing the water pricing guidelines of the WFD at the river basin scale and then uses hydro-economic modelling to estimate the impacts of applying these guidelines. The central purpose of the WFD is the protection...

  10. Modelling the economics of combined wind/hydro/diesel power systems

    International Nuclear Information System (INIS)

    Sinha, A.

    1993-01-01

    A model that stimulates the performance and economics of a combined wind/hydro/diesel plant with pumped storage has been developed. It is applied to a hypothetical site to demonstrate how a subset of the cheapest configuration of plant sizes may be identified, illustrating in particular the trade-off between the hydro storage capacity and the wind turbine penetration. It seems that, with the wind and water regimes employed, pumped storage is unlikely to have significant benefits, but may be beneficial in areas without natural inflow, in which case the reservoir is used as a store for excess wind output. (author)

  11. Distributionally robust hydro-thermal-wind economic dispatch

    International Nuclear Information System (INIS)

    Chen, Yue; Wei, Wei; Liu, Feng; Mei, Shengwei

    2016-01-01

    Highlights: • A two-stage distributionally robust hydro-thermal-wind model is proposed. • A semi-definite programing equivalent and its algorithm are developed. • Cases that demonstrate the effectiveness of the proposed model are included. - Abstract: With the penetration of wind energy increasing, uncertainty has become a major challenge in power system dispatch. Hydro power can change rapidly and is regarded as one promising complementary energy resource to mitigate wind power fluctuation. Joint scheduling of hydro, thermal, and wind energy is attracting more and more attention nowadays. This paper proposes a distributionally robust hydro-thermal-wind economic dispatch (DR-HTW-ED) method to enhance the flexibility and reliability of power system operation. In contrast to the traditional stochastic optimization (SO) and adjustable robust optimization (ARO) method, distributionally robust optimization (DRO) method describes the uncertain wind power output by all possible probability distribution functions (PDFs) with the same mean and variance recovered from the forecast data, and optimizes the expected operation cost in the worst distribution. Traditional DRO optimized the random parameter in entire space, which is sometimes contradict to the actual situation. In this paper, we restrict the wind power uncertainty in a bounded set, and derive an equivalent semi-definite programming (SDP) for the DR-HTW-ED using S-lemma. A delayed constraint generation algorithm is suggested to solve it in a tractable manner. The proposed DR-HTW-ED is compared with the existing ARO based hydro-thermal-wind economic dispatch (AR-HTW-ED). Their respective features are shown from the perspective of computational efficiency and conservativeness of dispatch strategies.

  12. Environmental flows in hydro-economic models

    Science.gov (United States)

    Pereau, Jean-Christophe; Pryet, Alexandre

    2018-03-01

    The protection of environmental flows, as a management objective for a regulating agency, needs to be consistent with the aquifer water balance and the degree of resource renewability. A stylized hydro-economic model is used where natural recharge, which sustains environmental flows, is considered both in the aquifer water budget and in the welfare function as ecosystem damage. Groundwater recharge and the associated natural drainage may be neglected for aquifers containing fossil water, where the groundwater is mined. However, when dealing with an aquifer that constitutes a renewable resource, for which recharge is not negligible, natural drainage should explicitly appear in the water budget. In doing so, the optimum path of net extraction rate does not necessarily converge to the recharge rate, but depends on the costs associated with ecosystem damages. The optimal paths and equilibrium values for the water volume and water extraction are analytically derived, and numerical simulations based on the Western La Mancha aquifer (southwest Spain) illustrate the theoretical results of the study.

  13. Generalized DSS shell for developing simulation and optimization hydro-economic models of complex water resources systems

    Science.gov (United States)

    Pulido-Velazquez, Manuel; Lopez-Nicolas, Antonio; Harou, Julien J.; Andreu, Joaquin

    2013-04-01

    Hydrologic-economic models allow integrated analysis of water supply, demand and infrastructure management at the river basin scale. These models simultaneously analyze engineering, hydrology and economic aspects of water resources management. Two new tools have been designed to develop models within this approach: a simulation tool (SIM_GAMS), for models in which water is allocated each month based on supply priorities to competing uses and system operating rules, and an optimization tool (OPT_GAMS), in which water resources are allocated optimally following economic criteria. The characterization of the water resource network system requires a connectivity matrix representing the topology of the elements, generated using HydroPlatform. HydroPlatform, an open-source software platform for network (node-link) models, allows to store, display and export all information needed to characterize the system. Two generic non-linear models have been programmed in GAMS to use the inputs from HydroPlatform in simulation and optimization models. The simulation model allocates water resources on a monthly basis, according to different targets (demands, storage, environmental flows, hydropower production, etc.), priorities and other system operating rules (such as reservoir operating rules). The optimization model's objective function is designed so that the system meets operational targets (ranked according to priorities) each month while following system operating rules. This function is analogous to the one used in the simulation module of the DSS AQUATOOL. Each element of the system has its own contribution to the objective function through unit cost coefficients that preserve the relative priority rank and the system operating rules. The model incorporates groundwater and stream-aquifer interaction (allowing conjunctive use simulation) with a wide range of modeling options, from lumped and analytical approaches to parameter-distributed models (eigenvalue approach). Such

  14. A satellite-driven, client-server hydro-economic model prototype for agricultural water management

    Science.gov (United States)

    Maneta, Marco; Kimball, John; He, Mingzhu; Payton Gardner, W.

    2017-04-01

    Anticipating agricultural water demand, land reallocation, and impact on farm revenues associated with different policy or climate constraints is a challenge for water managers and for policy makers. While current integrated decision support systems based on programming methods provide estimates of farmer reaction to external constraints, they have important shortcomings such as the high cost of data collection surveys necessary to calibrate the model, biases associated with inadequate farm sampling, infrequent model updates and recalibration, model overfitting, or their deterministic nature, among other problems. In addition, the administration of water supplies and the generation of policies that promote sustainable agricultural regions depend on more than one bureau or office. Unfortunately, managers from local and regional agencies often use different datasets of variable quality, which complicates coordinated action. To overcome these limitations, we present a client-server, integrated hydro-economic modeling and observation framework driven by satellite remote sensing and other ancillary information from regional monitoring networks. The core of the framework is a stochastic data assimilation system that sequentially ingests remote sensing observations and corrects the parameters of the hydro-economic model at unprecedented spatial and temporal resolutions. An economic model of agricultural production, based on mathematical programming, requires information on crop type and extent, crop yield, crop transpiration and irrigation technology. A regional hydro-climatologic model provides biophysical constraints to an economic model of agricultural production with a level of detail that permits the study of the spatial impact of large- and small-scale water use decisions. Crop type and extent is obtained from the Cropland Data Layer (CDL), which is multi-sensor operational classification of crops maintained by the United States Department of Agriculture. Because

  15. Hydro-economic modeling of water scarcity under global change: an application to the Gállego river basin (Spain)

    NARCIS (Netherlands)

    Graveline, N.; Majone, B.; van Duinen, Rianne; Ansink, E.

    2014-01-01

    Integrated approaches are needed to assess the effects of global changes on the future state of water resources at regional scales. We develop a hydro-economic model of the Gállego catchment, Spain, to assess how global change and policy options affect the catchment’s water scarcity and the economic

  16. Modelling the role of forests on water provision services: a hydro-economic valuation approach

    Science.gov (United States)

    Beguería, S.; Campos, P.

    2015-12-01

    Hydro-economic models that allow integrating the ecological, hydrological, infrastructure, economic and social aspects into a coherent, scientifically- informed framework constitute preferred tools for supporting decision making in the context of integrated water resources management. We present a case study of water regulation and provision services of forests in the Andalusia region of Spain. Our model computes the physical water flows and conducts an economic environmental income and asset valuation of forest surface and underground water yield. Based on available hydrologic and economic data, we develop a comprehensive water account for all the forest lands at the regional scale. This forest water environmental valuation is integrated within a much larger project aiming at providing a robust and easily replicable accounting tool to evaluate yearly the total income and capital of forests, encompassing all measurable sources of private and public incomes (timber and cork production, auto-consumption, recreational activities, biodiversity conservation, carbon sequestration, water production, etc.). We also force our simulation with future socio-economic scenarios to quantify the physical and economic efects of expected trends or simulated public and private policies on future water resources. Only a comprehensive integrated tool may serve as a basis for the development of integrated policies, such as those internationally agreed and recommended for the management of water resources.

  17. Is it worth protecting groundwater from diffuse pollution with agri-environmental schemes? A hydro-economic modeling approach.

    Science.gov (United States)

    Hérivaux, Cécile; Orban, Philippe; Brouyère, Serge

    2013-10-15

    In Europe, 30% of groundwater bodies are considered to be at risk of not achieving the Water Framework Directive (WFD) 'good status' objective by 2015, and 45% are in doubt of doing so. Diffuse agricultural pollution is one of the main pressures affecting groundwater bodies. To tackle this problem, the WFD requires Member States to design and implement cost-effective programs of measures to achieve the 'good status' objective by 2027 at the latest. Hitherto, action plans have mainly consisted of promoting the adoption of Agri-Environmental Schemes (AES). This raises a number of questions concerning the effectiveness of such schemes for improving groundwater status, and the economic implications of their implementation. We propose a hydro-economic model that combines a hydrogeological model to simulate groundwater quality evolution with agronomic and economic components to assess the expected costs, effectiveness, and benefits of AES implementation. This hydro-economic model can be used to identify cost-effective AES combinations at groundwater-body scale and to show the benefits to be expected from the resulting improvement in groundwater quality. The model is applied here to a rural area encompassing the Hesbaye aquifer, a large chalk aquifer which supplies about 230,000 inhabitants in the city of Liege (Belgium) and is severely contaminated by agricultural nitrates. We show that the time frame within which improvements in the Hesbaye groundwater quality can be expected may be much longer than that required by the WFD. Current WFD programs based on AES may be inappropriate for achieving the 'good status' objective in the most productive agricultural areas, in particular because these schemes are insufficiently attractive. Achieving 'good status' by 2027 would demand a substantial change in the design of AES, involving costs that may not be offset by benefits in the case of chalk aquifers with long renewal times. Copyright © 2013 Elsevier Ltd. All rights reserved.

  18. Economically viable and environment-friendly hydro energy in Estonia

    International Nuclear Information System (INIS)

    Saks, Ants; Velner, Harald

    2001-01-01

    Hydro energy has been in oblivion in Estonia for about 30 years now. During the 1960s, most of Estonia's small hydropower plants were closed down, just as it was done in the whole Soviet Union. As the only larger hydro plant, the 125 MW plant in Narva, was situated on the Russian side of the Narva River, there were only two or three small hydro plants left. Even those were exploited at low capacity and mainly for heating the buildings. It was not until the 1990s that a number of enthusiasts started to re-establish the hydro plants by reconstructing old installations. The pre-feasibility study 'Hydropower in Estonia' proposed by Estonian and Swedish experts, showed that the restoration of the hydropower plants and watermills is economically feasible and technically possible if advanced technology is used. Hydropower as an alternative ('green') energy source should be used in the best technical-economical way. The first pilot plant in Estonia, the 200 kW Kamari plant was constructed in 1998 with compact-propeller units, in co-operation with Waterpumps WP Oy and ABB. Today, ten new plants have been constructed or are under construction. Hydropower plants/watermills should be reconstructed in accordance with the legislative acts on environment protection

  19. JEDI: Jobs and Economic Development Impact Model

    Energy Technology Data Exchange (ETDEWEB)

    2017-06-13

    The Jobs and Economic Development Impact (JEDI) models are user-friendly tools that estimate the economic impacts of constructing and operating power generation and biofuel plants at the local (usually state) level. First developed by NREL's researchers to model wind energy jobs and impacts, JEDI has been expanded to also estimate the economic impacts of biofuels, coal, conventional hydro, concentrating solar power, geothermal, marine and hydrokinetic power, natural gas, photovoltaics, and transmission lines. This fact sheet focuses on JEDI for wind energy projects and is revised with 2017 figures.

  20. Water resources management using the WRF-Hydro modelling system: Case-study of the Tono dam in West Africa

    Directory of Open Access Journals (Sweden)

    E. Naabil

    2017-08-01

    Full Text Available Water resources are a major source of economic development for most West African (WA countries. There is, however inadequate information on these resources for the purposes of planning, decision-making and management. This paper explores the potential for using a state of the art hydrological model (WRF-Hydro in a fully coupled (i.e. land surface hydrology-atmosphere mode to assess these water resources, particularly the Tono basin in Ghana. The WRF-Hydro model is an enhanced version of the Weather Research and Forecasting model (WRF which allows simulating river discharge. A 2-domain configuration is chosen: an outer domain at 25 km horizontal resolution encompassing the West African Region and an inner domain at 5 km horizontal resolution centered on the Tono basin. The infiltration partition parameter and Manning’s roughness parameter were calibrated to fit the WRF-Hydro simulated discharge with the observed data. The simulations were done from 1999 to 2003, using 1999 as a spin-up period. The results were compared with TRMM precipitation, CRU temperature and available observed hydrological data. The WRF-Hydro model captured the attributes of the “observed” streamflow estimate; with Nash-Sutcliff efficiency (NSE of 0.78 and Pearson’s correlation of 0.89. Further validation of model results is based on using the output from the WRF-Hydro model as input into a water balance model to simulate the dam levels. WRF-Hydro has shown the potential for use in water resource planning (i.e. with respect to streamflow and dam level estimation. However, the model requires further improvement with respect to calibration of model parameters (e.g. baseflow and saturated hydraulic conductivity considering the effect of the accumulation of model bias in dam level estimation.

  1. A Hydro-Economic Approach to Representing Water Resources Impacts in Integrated Assessment Models

    Energy Technology Data Exchange (ETDEWEB)

    Kirshen, Paul H.; Strzepek, Kenneth, M.

    2004-01-14

    Grant Number DE-FG02-98ER62665 Office of Energy Research of the U.S. Department of Energy Abstract Many Integrated Assessment Models (IAM) divide the world into a small number of highly aggregated regions. Non-OECD countries are aggregated geographically into continental and multiple-continental regions or economically by development level. Current research suggests that these large scale aggregations cannot accurately represent potential water resources-related climate change impacts. In addition, IAMs do not explicitly model the flow regulation impacts of reservoir and ground water systems, the economics of water supply, or the demand for water in economic activities. Using the International Model for Policy Analysis of Agricultural Commodities and Trade (IMPACT) model of the International Food Policy Research Institute (IFPRI) as a case study, this research implemented a set of methodologies to provide accurate representation of water resource climate change impacts in Integrated Assessment Models. There were also detailed examinations of key issues related to aggregated modeling including: modeling water consumption versus water withdrawals; ground and surface water interactions; development of reservoir cost curves; modeling of surface areas of aggregated reservoirs for estimating evaporation losses; and evaluating the importance of spatial scale in river basin modeling. The major findings include: - Continental or national or even large scale river basin aggregation of water supplies and demands do not accurately capture the impacts of climate change in the water and agricultural sector in IAMs. - Fortunately, there now exist gridden approaches (0.5 X 0.5 degrees) to model streamflows in a global analysis. The gridded approach to hydrologic modeling allows flexibility in aligning basin boundaries with national boundaries. This combined with GIS tools, high speed computers, and the growing availability of socio-economic gridded data bases allows assignment of

  2. Hydro-economic modeling of the role of forests on water resources production in Andalusia, Spain

    Science.gov (United States)

    Beguería, Santiago; Serrano-Notivoli, Roberto; Álvarez-Palomino, Alejandro; Campos, Pablo

    2014-05-01

    The development of more refined information tools is a pre-requisite for supporting decision making in the context of integrated water resources management. Among these tools, hydro-economic models are favoured because they allow integrating the ecological, hydrological, infrastructure and economic aspects into a coherent, scientifically-informed framework. We present a case study that assesses physically the water resources of forest lands of the Andalusia region in Spain and conducts an economic environmental income and asset valuation of the forest surface water yield. We show how, based on available hydrologic and economic data, we can develop a comprehensive water account for all the forest lands at the regional scale. This forest water environmental valuation is part of the larger RECAMAN project, which aims at providing a robust and easily replicable accounting tool to evaluate yearly the total income an capital generated by the forest land, encompassing all measurable sources of private and public incomes (timber and cork production, auto-consumption, recreational activities, biodiversity conservation, carbon sequestration, water production, etc.). Only a comprehensive integrated tool such as the one built within the RECAMAN project may serve as a basis for the development of integrated policies such as those internationally agreed and recommended for the management of water resources.

  3. A new and integrated hydro-economic accounting and analytical framework for water resources: a case study for North China.

    Science.gov (United States)

    Guan, Dabo; Hubacek, Klaus

    2008-09-01

    Water is a critical issue in China for a variety of reasons. China is poor of water resources with 2,300 m(3) of per capita availability, which is less than 13 of the world average. This is exacerbated by regional differences; e.g. North China's water availability is only about 271 m(3) of per capita value, which is only 125 of the world's average. Furthermore, pollution contributes to water scarcity and is a major source for diseases, particularly for the poor. The Ministry of Hydrology [1997. China's Regional Water Bullets. Water Resource and Hydro-power Publishing House, Beijing, China] reports that about 65-80% of rivers in North China no longer support any economic activities. Previous studies have emphasized the amount of water withdrawn but rarely take water quality into consideration. The quality of the return flows usually changes; the water quality being lower than the water flows that entered the production process initially. It is especially important to measure the impacts of wastewater to the hydro-ecosystem. Thus, water consumption should not only account for the amount of water inputs but also the amount of water contaminated in the hydro-ecosystem by the discharged wastewater. In this paper we present a new accounting and analytical approach based on economic input-output modelling combined with a mass balanced hydrological model that links interactions in the economic system with interactions in the hydrological system. We thus follow the tradition of integrated economic-ecologic input-output modelling. Our hydro-economic accounting framework and analysis tool allows tracking water consumption on the input side, water pollution leaving the economic system and water flows passing through the hydrological system thus enabling us to deal with water resources of different qualities. Following this method, the results illustrate that North China requires 96% of its annual available water, including both water inputs for the economy and contaminated

  4. A Spatial Decision Support System to incorporate hydro-economic modeling results in the management of water resources under decentralized institutional arrangements in a semiarid reservoir region in Brazil

    Science.gov (United States)

    Alcoforado de Moraes, Márcia; Silva, Gerald; Siegmund-Schultze, Marianna

    2017-04-01

    The integration of economic and hydrological components in models, aimed to support evaluating alternatives of water allocation policies, is promising, though, challenging. Worldwide, these models have been used primarily in academia, and so far seldom by water managers for practical purposes. Ideally, the models should be available through a Decision Support System. The São Francisco River Basin in Northeast of Brazil has around 48% of its area in a semi-arid region. Irrigation and public water supply are the primary water use sectors, along with hydropower utilization. The water for electricity generation is stored in two large reservoirs, built 30 to 50 years ago under the premise of regulating flows for hydropower and controlling floods. Since 20 years, however, the law stipulates the multiple uses paradigm in a participatory and decentralized way. So far, only few rules laid down. Studies revealed that most of the respective institutions still needed to update their routines to the new paradigm. A hydro-economic model was developed and applied in order to determine the economically optimal water allocation of main users in that semiarid reservoir region. In order to make this model available to the decision makers, a minimum required is some form of manipulating data entry and output as well as some graphical interfaces. We propose and present the first features of a Spatial Decision Support System (SDSS) with dedicated hydro-economic modules in a web-based Geographic Information System (GIS) environment for integrated water resource management. The open model platform should include geoprocessing tasks and water user related data management. The hydro-economic geoprocessing will link to generic optimization modeling systems, such as EXCEL Solver, GAMS and MATLAB. The institutions are deliberating or deciding over water allocation at different scales could use the generated information on potential economic benefits as a transparent basis for discussion. In

  5. Hydro-Economic Modeling with Minimum Data Requirements: An Application to the São Francisco River Basin, Brazil

    Science.gov (United States)

    Torres, M.; Maneta, M.; Vosti, S.; Wallender, W.; Howitt, R.

    2008-12-01

    Policymakers have been charged with the efficient, equitable, and sustainable use of water resources of the São Francisco River Basin (SFRB), Brazil, and also with the promotion of economic growth and the reduction of poverty within the basin. To date, policymakers lack scientific evidence on the potential consequences for growth, poverty alleviation or environmental sustainability of alternative uses of water resources. To address these key knowledge gaps, we have linked a hydrologic and an economic model of agriculture to investigate how economic decisions affect available water, and vice versa. More specifically, the models are used to predict the effects of the application of Brazilian federal surface water use policies on farmer's net revenues and on the hydrologic system. The Economic Model of Agriculture. A spatially explicit, farm-level model capable of accommodating a broad array of farm sizes and farm/farmer characteristics is developed and used to predict the effects of alternative water policies and neighbors' water use patterns on crop mix choice. A production function comprised of seven categories of non-water-related inputs used in agriculture (land, fertilizers, pesticides, seeds, hired labor, family labor and machinery) and four water-related inputs used in agriculture (applied water, irrigation labor, irrigation capital and energy) is estimated. The parameters emerging from this estimated production function are then introduced into a non-linear, net revenue maximization positive mathematical programming algorithm that is used for simulations. The Hydrological Model. MIKE Basin, a semi-distributed hydrology model, is used to calculate water budgets for the SFRB. MIKE Basin calculates discharge at selected nodes by accumulating runoff down the river network; it simulates reservoirs using stage-area-storage and downstream release rule curves. The data used to run the model are discharge to calculate local runoff, precipitation, reference ET, crop

  6. The Hydro-Economic Interdependency of Cities: Virtual Water Connections of the Phoenix, Arizona Metropolitan Area

    Directory of Open Access Journals (Sweden)

    Richard R. Rushforth

    2015-06-01

    Full Text Available Water footprinting has revealed hydro-economic interdependencies between distant global geographies via trade, especially of agricultural and manufactured goods. However, for metropolitan areas, trade not only entails commodity flows at many scales from intra-municipal to global, but also substantial intra-metropolitan flows of the skilled labor that is essential to a city’s high-value economy. Virtual water flows between municipalities are directly relevant for municipal water supply policy and infrastructure investment because they quantify the hydro-economic dependency between neighboring municipalities. These municipalities share a physical water supply and also place demands on their neighbors’ water supplies by outsourcing labor and commodity production outside the municipal and water supply system boundary to the metropolitan area. Metropolitan area communities span dense urban cores to fringe agricultural towns, spanning a wide range of the US hydro-economy. This study quantifies water footprints and virtual water flows of the complete economy of the Phoenix Metropolitan Area’s municipalities. A novel approach utilized journey to work data to estimate virtual water flows embedded in labor. Commodities dominate virtual water flows at all scales of analysis, however labor is shown to be important for intra-metropolitan virtual water flows. This is the first detailed water footprint analysis of Phoenix, an important city in a water-scarce region. This study establishes a hydro-economic typology for communities to define several niche roles and decision making points of view. This study’s findings can be used to classify communities with respect to their relative roles, and to benchmark future improvements in water sustainability for all types of communities. More importantly, these findings motivate cooperative approaches to intra-metropolitan water supply policy that recognize the hydro-economic interdependence of these

  7. Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

    Energy Technology Data Exchange (ETDEWEB)

    Huertas-Hernando, Daniel [Department of Energy Systems, SINTEF, Trondheim Norway; Farahmand, Hossein [Department of Electric Power Engineering, Norwegian University of Science and Technology (NTNU), Trondheim Norway; Holttinen, Hannele [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Kiviluoma, Juha [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Rinne, Erkka [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Söder, Lennart [Department of Electrical Engineering, KTH University, Stockholm Sweden; Milligan, Michael [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Ibanez, Eduardo [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Martínez, Sergio Martín [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Gomez-Lazaro, Emilio [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Estanqueiro, Ana [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Rodrigues, Luis [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Carr, Luis [Research Association for Energy Economics (FfE GmbH), Munich Germany; van Roon, Serafin [Research Association for Energy Economics (FfE GmbH), Munich Germany; Orths, Antje Gesa [Energinet.dk, Fredericia Denmark; Eriksen, Peter Børre [Energinet.dk, Fredericia Denmark; Forcione, Alain [Hydro Quebec, Montréal Canada; Menemenlis, Nickie [Hydro Quebec, Montréal Canada

    2016-06-20

    Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as well as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.

  8. Decision support for the management of water resources at Sub-middle of the São Francisco river basin in Brazil using integrated hydro-economic modeling and scenarios for land use changes

    Science.gov (United States)

    Moraes, M. G. A.; Souza da Silva, G.

    2016-12-01

    Hydro-economic models can measure the economic effects of different operating rules, environmental restrictions, ecosystems services, technical constraints and institutional constraints. Furthermore, water allocation can be improved by considering economical criteria's. Likewise, climate and land use change can be analyzed to provide resilience. We developed and applied a hydro-economic optimization model to determine the optimal water allocation of main users in the Lower-middle São Francisco River Basin in Northeast (NE) Brazil. The model uses demand curves for the irrigation projects, small farmers and human supply, rather than fixed requirements for water resources. This study analyzed various constraints and operating alternatives for the installed hydropower dams in economic terms. A seven-year period (2000-2006) with water scarcity in the past has been selected to analyze the water availability and the associated optimal economic water allocation. The used constraints are technical, socioeconomic and environmental. The economically impacts of scenarios like prioritizing human consumption, impacts of the implementation of the São Francisco river transposition, human supply without high distribution losses, environmental hydrographs, forced reservoir level control, forced reduced reservoir capacity, alteration of lower flow restriction were analyzed. The results in this period show that scarcity costs related ecosystem service and environmental constraints are significant, and have major impacts (increase of scarcity cost) for consumptive users like irrigation projects. In addition, institutional constraints such as prioritizing human supply, minimum release limits downstream of the reservoirs and the implementation of the transposition project impact the costs and benefits of the two main economic sectors (irrigation and power generation) in the region of the Lower-middle of the São Francisco river basin. Scarcity costs for irrigation users generally

  9. JEDI: Jobs and Economic Development Impact Model; NREL (National Renewable Energy Laboratory)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-08-01

    The Jobs and Economic Development Impact (JEDI) models are user-friendly tools that estimate the economic impacts of constructing and operating power generation and biofuel plants at the local (usually state) level. First developed by NREL’s researchers to model wind energy jobs and impacts, JEDI has been expanded to also estimate the economic impacts of biofuels, coal, conventional hydro, concentrating solar power, geothermal, marine and hydrokinetic power, natural gas, photovoltaics, and transmission lines. This fact sheet focuses on JEDI for wind energy projects.

  10. Economic impact of Hydro-Quebec's nuclear activities

    International Nuclear Information System (INIS)

    Emard, R.

    1994-01-01

    Gentilly 2 nuclear power plant has benefited the regions of Becancour and Trois Rivieres, with spin-off at the provincial level. Gentilly 2 is Hydro Quebec's only nuclear plant. Its 675 MW provide nearly 3% of Hydro Quebec's production. Over 664 permanent jobs were created, 70% of them highly specialized and multi-skilled. In 1993, out of C$99 spent, 57.3 were for wages, 16.3 for equipment and supplies (including fuel and heavy water), 18 for professional services provided by AECL and others, and the remainder included fees, permits, contract work, and miscellaneous. Gentilly 2 has fostered technological development and inventions which are used at other CANDU stations. 7 ills

  11. Hydro-economic modeling of integrated solutions for the water-energy-land nexus in Africa

    Science.gov (United States)

    Parkinson, S.; Kahil, M.; Wada, Y.; Krey, V.; Byers, E.; Johnson, N. A.; Burek, P.; Satoh, Y.; Willaarts, B.; Langan, S.; Riahi, K.

    2017-12-01

    This study focused on the development of the Extended Continental-scale Hydro-economic Optimization model (ECHO) and its application to the analysis of long-term water, energy and land use pathways for Africa. The framework is important because it integrates multi-decadal decisions surrounding investments into new water infrastructure, electric power generation and irrigation technologies. The improved linkages in ECHO reveal synergies between water allocation strategies across sectors and the greenhouse gas emissions resulting from electricity supply. The African case study features a reduced-form transboundary river network and associated environmental flow constraints covering surface and groundwater withdrawals. Interactions between local water constraints and the continental-scale economy are captured in the model through the combination of regional electricity markets. Spatially-explicit analysis of land availability is used to restrict future reservoir expansion. The analysis demonstrates the massive investments required to ensure rapidly expanding water, energy and food demands in Africa aligned with human development objectives are met in a sustainable way. Modeled constraints on environmental flows in line with presumptive ecological guidelines trigger diffusion of energy-intensive water supply technologies in water-stressed regions, with implications for the cost and speed of the electricity sector decarbonization required to achieve climate targets.

  12. Developing models that analyze the economic/environmental trade-offs implicit in water resource management

    Science.gov (United States)

    Howitt, R. E.

    2016-12-01

    Hydro-economic models have been used to analyze optimal supply management and groundwater use for the past 25 years. They are characterized by an objective function that usually maximizes economic measures such as consumer and producer surplus subject to hydrologic equations of motion or water distribution systems. The hydrologic and economic components are sometimes fully integrated. Alternatively they may use an iterative interactive process. Environmental considerations have been included in hydro-economic models as inequality constraints. Representing environmental requirements as constraints is a rigid approximation of the range of management alternatives that could be used to implement environmental objectives. The next generation of hydro-economic models, currently being developed, require that the environmental alternatives be represented by continuous or semi-continuous functions which relate water resource use allocated to the environment with the probabilities of achieving environmental objectives. These functions will be generated by process models of environmental and biological systems which are now advanced to the state that they can realistically represent environmental systems and flexibility to interact with economic models. Examples are crop growth models, climate modeling, and biological models of forest, fish, and fauna systems. These process models can represent environmental outcomes in a form that is similar to economic production functions. When combined with economic models the interacting process models can reproduce a range of trade-offs between economic and environmental objectives, and thus optimize social value of many water and environmental resources. Some examples of this next-generation of hydro-enviro- economic models are reviewed. In these models implicit production functions for environmental goods are combined with hydrologic equations of motion and economic response functions. We discuss models that show interaction between

  13. Raising the Dead without a Red Sea-Dead Sea project? Hydro-economics and governance

    Directory of Open Access Journals (Sweden)

    D. E. Rosenberg

    2011-04-01

    Full Text Available Seven decades of extractions have dramatically reduced Jordan River flows, lowered the Dead Sea level, opened sink holes, and caused other environmental problems. The fix Jordan, Israel, and the Palestinians propose would build an expensive multipurpose conveyance project from the Red Sea to the Dead Sea that would also generate hydropower and desalinate water. This paper compares the Red-Dead project to alternatives that may also raise the Dead Sea level. Hydro-economic model results for the Jordan-Israel-Palestinian inter-tied water systems show two restoration alternatives are more economically viable than the proposed Red-Dead project. Many decentralized new supply, wastewater reuse, conveyance, conservation, and leak reduction projects and programs in each country can together increase economic benefits and reliably deliver up to 900 MCM yr−1 to the Dead Sea. Similarly, a smaller Red-Dead project that only generates hydropower can deliver large flows to the Dead Sea when the sale price of generated electricity is sufficiently high. However, for all restoration options, net benefits fall and water scarcity rises as flows to the Dead Sea increase. This finding suggests (i each country has no individual incentive to return water to the Dead Sea, and (ii outside institutions that seek to raise the Dead must also offer countries direct incentives to deliver water to the Sea besides building the countries new infrastructure.

  14. Hydrological Modeling in Alaska with WRF-Hydro

    Science.gov (United States)

    Elmer, N. J.; Zavodsky, B.; Molthan, A.

    2017-12-01

    The operational National Water Model (NWM), implemented in August 2016, is an instantiation of the Weather Research and Forecasting hydrological extension package (WRF-Hydro). Currently, the NWM only covers the contiguous United States, but will be expanded to include an Alaska domain in the future. It is well known that Alaska presents several hydrological modeling challenges, including unique arctic/sub-arctic hydrological processes not observed elsewhere in the United States and a severe lack of in-situ observations for model initialization. This project sets up an experimental version of WRF-Hydro in Alaska mimicking the NWM to gauge the ability of WRF-Hydro to represent hydrological processes in Alaska and identify model calibration challenges. Recent and upcoming launches of hydrology-focused NASA satellite missions such as the Soil Moisture Active Passive (SMAP) and Surface Water Ocean Topography (SWOT) expand the spatial and temporal coverage of observations in Alaska, so this study also lays the groundwork for assimilating these NASA datasets into WRF-Hydro in the future.

  15. Low head hydro market assessment : main report : vol. 1

    International Nuclear Information System (INIS)

    2008-03-01

    Hydroelectric power is a predictable renewable energy source that produces no greenhouse gases (GHGs) and has low maintenance costs. In addition to river resources, low head hydro is available in sluice gates, irrigation canals, drinking water pressure release valves, and municipal wastewater outfalls. Canada's potential for low head hydro has been estimated at 5000 MW at 2000 different sites across the country. Sites of up to 50 MW have been identified in Ontario and Manitoba. This study performed a market assessment on low head hydro developments. Available and emerging technologies for developing low head hydro were identified. The economics of low head hydro in Canada were explored, and barriers to low head hydro development were identified. Strategies to promote low head hydro development were also explored, and the impact of different incentive types on the low head hydropower market were estimated using a simple economic model. It was concluded that a reduced, streamlined, and standardized environmental assessment process will significantly benefit low head hydro development in Canada. 5 refs., 14 tabs., 17 figs

  16. Hydro-methane and methanol combined production from hydroelectricity and biomass: Thermo-economic analysis in Paraguay

    International Nuclear Information System (INIS)

    Rivarolo, M.; Bellotti, D.; Mendieta, A.; Massardo, A.F.

    2014-01-01

    Highlights: • We investigate H 2 /O 2 production from large hydraulic plant by water electrolysis. • We produce methanol and hydro-methane from H 2 /O 2 obtained. • We investigate two different configurations of the plant. • We perform a thermo-economic analysis for three scenarios in Paraguay. • We find plants optimal size using a time-dependent thermo-economic approach. - Abstract: A thermo-economic analysis regarding large scale hydro-methane and methanol production from renewable sources (biomass and renewable electricity) is performed. The study is carried out investigating hydrogen and oxygen generation by water electrolysis, mainly employing the hydraulic energy produced from the 14 GW Itaipu Binacional Plant, owned by Paraguay and Brazil. Oxygen is employed in biomass gasification to synthesize methanol; the significant amount of CO 2 separated in the process is mixed with hydrogen produced by electrolysis in chemical reactors to produce hydro-methane. Hydro-methane is employed to supply natural gas vehicles in Paraguay, methanol is sold to Brazil, that is the largest consumer in South America. The analysis is performed employing time-dependent hydraulic energy related to the water that would normally not be used by the plant, named “spilled energy”, when available; in the remaining periods, electricity is acquired at higher cost by the national grid. For the different plant lay-outs, a thermo-economic analysis has been performed employing two different software, one for the design point and one for the time-dependent one entire year optimization, since spilled energy is strongly variable throughout the year. Optimal sizes for the generation plants have been determined, investigating the influence of electricity cost, size and plant configuration

  17. Mathematical model comparing of the multi-level economics systems

    Science.gov (United States)

    Brykalov, S. M.; Kryanev, A. V.

    2017-12-01

    The mathematical model (scheme) of a multi-level comparison of the economic system, characterized by the system of indices, is worked out. In the mathematical model of the multi-level comparison of the economic systems, the indicators of peer review and forecasting of the economic system under consideration can be used. The model can take into account the uncertainty in the estimated values of the parameters or expert estimations. The model uses the multi-criteria approach based on the Pareto solutions.

  18. Economic assessment at farm level of the implementation of deficit irrigation for quinoa production in the Southern Bolivian Altiplano

    Directory of Open Access Journals (Sweden)

    J. Cusicanqui

    2013-10-01

    Full Text Available In the Southern Bolivian Altiplano recent research has suggested to introduce deficit irrigation as a strategy to boost quinoa yields and to stabilize it at 2.0 ton ha-1. In this study we carried out an economic assessment of the implementation of deficit irrigation at farm level using a hydro-economic model for simulating profit for quinoa production. As input of the model we worked with previously developed farms typology (livestock, quinoa and subsistence farms, simulated quinoa production with and without irrigation using AquaCrop model, and calculated yield response functions for four different climate scenarios (wet, normal, dry and very dry years. Results from the hydro-economic model demonstrate that maximum profit is achieved with less applied irrigated water than for maximum yield, and irrigated quinoa earned more profit than rainfed production for all farms types and climate scenarios. As expected, the benefits of irrigation under dry and very dry climate conditions were higher than those under normal and wet years, and benefits among farms types were higher for quinoa farms. In fact, profit of irrigated quinoa might be stabilized at around BOB 6500 ha-1 (about USD 920 compared with the huge differences found for rainfed conditions for all climate scenarios. Interestingly, the economic water productivity, expressed in terms of economic return for amount of applied irrigated water (BOB mm-1, reached the highest values with intermediate and low level of water availability schemes of deficit irrigation for all climate scenarios.

  19. Hydro-Thermal-Wind Generation Scheduling Considering Economic and Environmental Factors Using Heuristic Algorithms

    Directory of Open Access Journals (Sweden)

    Suresh K. Damodaran

    2018-02-01

    Full Text Available Hydro-thermal-wind generation scheduling (HTWGS with economic and environmental factors is a multi-objective complex nonlinear power system optimization problem with many equality and inequality constraints. The objective of the problem is to generate an hour-by-hour optimum schedule of hydro-thermal-wind power plants to attain the least emission of pollutants from thermal plants and a reduced generation cost of thermal and wind plants for a 24-h period, satisfying the system constraints. The paper presents a detailed framework of the HTWGS problem and proposes a modified particle swarm optimization (MPSO algorithm for evolving a solution. The competency of selected heuristic algorithms, representing different heuristic groups, viz. the binary coded genetic algorithm (BCGA, particle swarm optimization (PSO, improved harmony search (IHS, and JAYA algorithm, for searching for an optimal solution to HTWGS considering economic and environmental factors was investigated in a trial system consisting of a multi-stream cascaded system with four reservoirs, three thermal plants, and two wind plants. Appropriate mathematical models were used for representing the water discharge, generation cost, and pollutant emission of respective power plants incorporated in the system. Statistical analysis was performed to check the consistency and reliability of the proposed algorithm. The simulation results indicated that the proposed MPSO algorithm provided a better solution to the problem of HTWGS, with a reduced generation cost and the least emission, when compared with the other heuristic algorithms considered.

  20. Neuro-fuzzy modelling of hydro unit efficiency

    International Nuclear Information System (INIS)

    Iliev, Atanas; Fushtikj, Vangel

    2003-01-01

    This paper presents neuro-fuzzy method for modeling of the hydro unit efficiency. The proposed method uses the characteristics of the fuzzy systems as universal function approximates, as well the abilities of the neural networks to adopt the parameters of the membership's functions and rules in the consequent part of the developed fuzzy system. Developed method is practically applied for modeling of the efficiency of unit which will be installed in the hydro power plant Kozjak. Comparison of the performance of the derived neuro-fuzzy method with several classical polynomials models is also performed. (Author)

  1. The hydro-mechanical modeling of the fractured media

    International Nuclear Information System (INIS)

    Kadiri, I.

    2002-10-01

    The hydro-mechanical modeling of the fractured media is quite complex. Simplifications are necessary for the modeling of such media, but, not always justified, Only permeable fractures are often considered. The rest of the network is approximated by an equivalent continuous medium. Even if we suppose that this approach is validated, the hydraulic and mechanical properties of the fractures and of the continuous medium are seldom known. Calibrations are necessary for the determination of these properties. Until now, one does not know very well the nature of measurements which must be carried out in order to carry on a modeling in discontinuous medium, nor elements of enough robust validation for this kind of modeling. For a better understanding of the hydro-mechanical phenomena in fractured media, two different sites have been selected for the work. The first is the site of Grimsel in Switzerland in which an underground laboratory is located at approximately 400 m of depth. The FEBEX experiment aims at the in-situ study of the consecutive phenomena due to the installation of a heat source representative of radioactive waste in the last 17 meters of the FEBEX tunnel in the laboratory of Grimsel. Only, the modeling of the hydro-mechanical of the excavation was model. The modeling of the Febex enabled us to establish a methodology of calibration of the hydraulic properties in the discontinuous media. However, this kind of study on such complex sites does not make possible to answer all the questions which arise on the hydro-mechanical behavior of the fractured media. We thus carried out modeling on an other site, smaller than the fist one and more accessible. The experimental site of Coaraze, in the Maritime Alps, is mainly constituted of limestone and fractures. Then the variation of water pressure along fractures is governed by the opening/closure sequence of a water gate. Normal displacement as well as the pore pressure along these fractures are recorded, and then

  2. HydroShare: A Platform for Collaborative Data and Model Sharing in Hydrology

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of and collaboration around "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting its use as a virtual environment supporting education and research. HydroShare has components that support: (1) resource storage, (2) resource exploration, and (3) web apps for actions on resources. The HydroShare data discovery, sharing and publishing functions as well as HydroShare web apps provide the capability to analyze data and execute models completely in the cloud (servers remote from the user) overcoming desktop platform limitations. The HydroShare GIS app provides a basic capability to visualize spatial data. The HydroShare JupyterHub Notebook app provides flexible and documentable execution of Python code snippets for analysis and modeling in a way that results can be shared among HydroShare users and groups to support research collaboration and education. We will discuss how these developments can be used to support different types of educational efforts in Hydrology where being completely web based is of value in an educational setting as students can all have access to the same functionality regardless of their computer.

  3. Integrated assessment of policy interventions for promoting sustainable irrigation in semi-arid environments: a hydro-economic modeling approach.

    Science.gov (United States)

    Blanco-Gutiérrez, Irene; Varela-Ortega, Consuelo; Purkey, David R

    2013-10-15

    to balance competing water demands in the basin and to increase economic water productivity, but might not be sufficient to ensure the provision of environmental flows as required by the WFD. A thoroughly revision of the basin's water use concession system for irrigation seems to be needed in order to bring the GRBMP in line with the WFD objectives. Furthermore, the study illustrates that social, economic, institutional, and technological factors, in addition to bio-physical conditions, are important issues to be considered for designing and developing water management strategies. The research initiative presented in this paper demonstrates that hydro-economic models can explicitly integrate all these issues, constituting a valuable tool that could assist policy makers for implementing sustainable irrigation policies. Copyright © 2013 Elsevier Ltd. All rights reserved.

  4. Interconnected hydro-thermal systems - Models, methods, and applications

    DEFF Research Database (Denmark)

    Hindsberger, Magnus

    2003-01-01

    to be performed where the uncertainty of the inflow to the hydro reservoirs is handled endogenously. In this model snow reservoirs have been added in addition to the hydro reservoirs. Using this new approach allows sampling based decomposition algorithms to be used, which have proved to be efficient in solving...

  5. A modified gravitational search algorithm based on a non-dominated sorting genetic approach for hydro-thermal-wind economic emission dispatching

    International Nuclear Information System (INIS)

    Chen, Fang; Zhou, Jianzhong; Wang, Chao; Li, Chunlong; Lu, Peng

    2017-01-01

    Wind power is a type of clean and renewable energy, and reasonable utilization of wind power is beneficial to environmental protection and economic development. Therefore, a short-term hydro-thermal-wind economic emission dispatching (SHTW-EED) problem is presented in this paper. The proposed problem aims to distribute the load among hydro, thermal and wind power units to simultaneously minimize economic cost and pollutant emission. To solve the SHTW-EED problem with complex constraints, a modified gravitational search algorithm based on the non-dominated sorting genetic algorithm-III (MGSA-NSGA-III) is proposed. In the proposed MGSA-NSGA-III, a non-dominated sorting approach, reference-point based selection mechanism and chaotic mutation strategy are applied to improve the evolutionary process of the original gravitational search algorithm (GSA) and maintain the distribution diversity of Pareto optimal solutions. Moreover, a parallel computing strategy is introduced to improve the computational efficiency. Finally, the proposed MGSA-NSGA-III is applied to a typical hydro-thermal-wind system to verify its feasibility and effectiveness. The simulation results indicate that the proposed algorithm can obtain low economic cost and small pollutant emission when dealing with the SHTW-EED problem. - Highlights: • A hybrid algorithm is proposed to handle hydro-thermal-wind power dispatching. • Several improvement strategies are applied to the algorithm. • A parallel computing strategy is applied to improve computational efficiency. • Two cases are analyzed to verify the efficiency of the optimize mode.

  6. Hydro models and salmon recovery in the northwest

    International Nuclear Information System (INIS)

    Dragoon, K.

    1993-01-01

    Hydro regulation models provide extensive support for analyzing the efficacy of salmon recovery plans in the Northwest. Power planners developed these computer programs to help plan and efficiently operate a large multiple use river system. The models represent physical relationships and operational requirements on the system. They also simulate coordinated system operations for efficient power generation. These models are being pressed into service to provide data for fish recovery plans. They provide important information about hydro system capabilities and responses to recovery programs. However, the models cannot meet all of the analytical needs of fish biologists working toward salmon recovery

  7. Short-term regulation of hydro powerplants. Studies on the environmental effects

    International Nuclear Information System (INIS)

    Sinisalmi, T.; Riihimaeki, J.; Vehanen, T.; Yrjaenae, T.

    1997-01-01

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs

  8. Short-term regulation of hydro powerplants. Studies on the environmental effects

    Energy Technology Data Exchange (ETDEWEB)

    Sinisalmi, T. [ed.; Forsius, J.; Muotka, J.; Soimakallio, H. [Imatran Voima Oy, Vantaa (Finland); Riihimaeki, J. [VTT, Espoo (Finland); Vehanen, T. [Finnish Game and Fisheries Research Inst. (Finland); Yrjaenae, T. [North Ostrobothnia Regional Environmental Centre, Oulu (Finland)

    1997-12-31

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs.

  9. Restoring coastal wetlands that were ditched for mosquito control: a preliminary assessment of hydro-leveling as a restoration technique

    Science.gov (United States)

    Smith, Thomas J.; Tiling, Ginger; Leasure, Pamela S.

    2007-01-01

    The wetlands surrounding Tampa Bay, Florida were extensively ditched for mosquito control in the 1950s. Spoil from ditch construction was placed adjacent to the wetlands ditches creating mound-like features (spoil-mounds). These mounds represent a loss of 14% of the wetland area in Tampa Bay. Spoil mounds interfere with tidal flow and are locations for non-native plants to colonize (e.g., Schinus terebinthifolius). Removal of the spoil mounds to eliminate exotic plants, restore native vegetation, and re-establish natural hydrology is a restoration priority for environmental managers. Hydro-leveling, a new technique, was tested in a mangrove forest restoration project in 2004. Hydro-leveling uses a high pressure stream of water to wash sediment from the spoil mound into the adjacent wetland and ditch. To assess the effectiveness of this technique, we conducted vegetation surveys in areas that were hydro-leveled and in non-hydro-leveled areas 3 years post-project. Adult Schinus were reduced but not eliminated from hydro-leveled mounds. Schinus seedlings however were absent from hydro-leveled sites. Colonization by native species was sparse. Mangrove seedlings were essentially absent (≈2 m−2) from the centers of hydro-leveled mounds and were in low density on their edges (17 m−2) in comparison to surrounding mangrove forests (105 m−2). Hydro-leveling resulted in mortality of mangroves adjacent to the mounds being leveled. This was probably caused by burial of pneumatophores during the hydro-leveling process. For hydro-leveling to be a useful and successful restoration technique several requirements must be met. Spoil mounds must be lowered to the level of the surrounding wetlands. Spoil must be distributed further into the adjacent wetland to prevent burial of nearby native vegetation. Finally, native species may need to be planted on hydro-leveled areas to speed up the re-vegetation process.

  10. Integrated operation of hydro thermal system

    International Nuclear Information System (INIS)

    Nanthakumar, J.

    1994-01-01

    Long-term power system expansion planning studies are carried out to meet the electricity requirement in the future. Prior to the expansion planning studies, it is essential to know the energy potential of the existing generating system, especially the hydro power plants. Detailed hydro thermal stimulation studies of the integrated system is therefore carried out to determine the best way to maximise the hydro energy of the existing and committed plants. The results of the integrated system simulated model are stored in numerous files and are available for retrieval. Most important output used for expansion analysis is the energy production of each hydro plant. The annual hydro energy potential of the total hydro system of Sri Lanka for the hydrological year from 1949 to 1988 is given. Hydro condition data with different probability levels are also indicated

  11. Impacts of climate change on the food-energy-water nexus in the upper Yellow River Basin: An integrated hydro-economic modeling approach

    Science.gov (United States)

    Si, Y.; Cai, X.

    2017-12-01

    The large-scale reservoir system built on the upper Yellow River serves multiple purposes. The generated hydropower supplies over 60% of the entire electricity for the regional power grid while the irrigated crop production feeds almost one-third of the total population throughout the whole river basin. Moreover, the reservoir system also bears the responsibility for controlling ice flood, which occurs during the non-flood season due to winter ice freezing followed by spring thawing process, and could be even more disastrous than the summer flood. The contradiction of water allocation to satisfy multi-sector demands while mitigating ice flood risk has been longstanding. However, few researchers endeavor to employ the nexus thinking to addressing the complexities involved in all the interlinked purposes. In this study, we develop an integrated hydro-economic model that can be used to explore both the tradeoffs and synergies between the multiple purposes, based on which the water infrastructures (e.g., reservoir, diversion canal, pumping well) can be coordinated for maximizing the co-benefits of multiple sectors. The model is based on a node-link schematic of multiple operations including hydropower generation, irrigation scheduling, and the conjunctive use of surface and ground water resources. In particular, the model depicts some details regarding reservoir operation rules during the ice season using two indicators, i.e., flow control period and flow control level. The rules are obtained from historical records using data mining techniques under different climate conditions, and they are added to the model as part of the system constraints. Future reservoir inflow series are generated by a hydrological model with future climate scenarios projected by General Circulation Model (GCM). By analyzing the model results under the various climate scenarios, the future possible shifting trajectory of the food-energy-water system characteristics will be derived compared to

  12. Linear Modeling and Regulation Quality Analysis for Hydro-Turbine Governing System with an Open Tailrace Channel

    Directory of Open Access Journals (Sweden)

    Jiandong Yang

    2015-10-01

    Full Text Available On the basis of the state–space method (SSM, a novel linear mathematical model of the unsteady flow for the tailrace system with an open channel is proposed. This novel model is an elastic linearized model of water hammer. The validity of the model has been verified by several examples of numerical simulation, which are based on a finite difference technique. Then, the complete mathematical model for the hydro-turbine governing system of hydropower station with an open tailrace channel, which is used for simulating the transient process of the hydro-turbine governing system under load disturbance, is established by combining the models of hydro-turbine, generator, governor and open tailrace channel. Finally, according to the complete model, the regulation quality for hydro-turbine governing system with an open tailrace channel under load disturbance is studied, and the effects of open tailrace channel and tailrace surge tank on regulation quality are analyzed. The results indicate that: The open tailrace channel has a strong influence on the regulation quality by observing the water level fluctuations in tailrace surge tank. The surge shows a piecewise periodical change along with the variation in the length of an open channel. The open tailrace channel can be used to improve the regulation quality of hydro-turbine governing system.

  13. Interaction between GIS and hydrologic model: A preliminary approach using ArcHydro Framework Data Model

    Directory of Open Access Journals (Sweden)

    Silvio Jorge C. Simões

    2013-08-01

    Full Text Available In different regions of Brazil, population growth and economic development can degrade water quality, compromising watershed health and human supply. Because of its ability to combine spatial and temporal data in the same environment and to create water resources management (WRM models, the Geographical Information System (GIS is a powerful tool for managing water resources, preventing floods and estimating water supply. This paper discusses the integration between GIS and hydrological models and presents a case study relating to the upper section of the Paraíba do Sul Basin (Sao Paulo State portion, situated in the Southeast of Brazil. The case study presented in this paper has a database suitable for the basin’s dimensions, including digitized topographic maps at a 50,000 scale. From an ArcGIS®/ArcHydro Framework Data Model, a geometric network was created to produce different raster products. This first grid derived from the digital elevation model grid (DEM is the flow direction map followed by flow accumulation, stream and catchment maps. The next steps in this research are to include the different multipurpose reservoirs situated along the Paraíba do Sul River and to incorporate rainfall time series data in ArcHydro to build a hydrologic data model within a GIS environment in order to produce a comprehensive spatial temporal model.

  14. Complementarity of hydro and wind power: Improving the risk profile of energy inflows

    International Nuclear Information System (INIS)

    Denault, Michel; Dupuis, Debbie; Couture-Cardinal, Sebastien

    2009-01-01

    The complementarity of two renewable energy sources, namely hydro and wind, is investigated. We consider the diversification effect of wind power to reduce the risk of water inflow shortages, an important energy security concern for hydropower-based economic zones (e.g. Quebec and Norway). Our risk measure is based on the probability of a production deficit, in a manner akin to the value-at-risk, simulation analysis of financial portfolios. We examine whether the risk level of a mixed hydro-and-wind portfolio of generating assets improves on the risk of an all-hydro portfolio, by relaxing the dependence on water inflows and attenuating the impact of droughts. Copulas are used to model the dependence between the two sources of energy. The data considered, over the period 1958-2003, are for the province of Quebec, which possesses large hydro and wind resources. Our results indicate that for all scenarios considered, any proportion of wind up to 30% improves the production deficit risk profile of an all-hydro system. We can also estimate the value, in TW h, of any additional one percent of wind in the portfolio. (author)

  15. Design concept of Hydro cascade control system

    International Nuclear Information System (INIS)

    Fustik, Vangel; Kiteva, Nevenka

    2006-01-01

    In this paper a design concept of the comple hydro cascade scheme is presented with the design parameters of the main technical features. The cascade control system architecture is designed considering up-to-date communication and information technology. The control algorithm is based on Pond Level Control and Economic Load Allocation concepts.

  16. Simulating the Risk of Liver Fluke Infection using a Mechanistic Hydro-epidemiological Model

    Science.gov (United States)

    Beltrame, Ludovica; Dunne, Toby; Rose, Hannah; Walker, Josephine; Morgan, Eric; Vickerman, Peter; Wagener, Thorsten

    2016-04-01

    Liver Fluke (Fasciola hepatica) is a common parasite found in livestock and responsible for considerable economic losses throughout the world. Risk of infection is strongly influenced by climatic and hydrological conditions, which characterise the host environment for parasite development and transmission. Despite on-going control efforts, increases in fluke outbreaks have been reported in recent years in the UK, and have been often attributed to climate change. Currently used fluke risk models are based on empirical relationships derived between historical climate and incidence data. However, hydro-climate conditions are becoming increasingly non-stationary due to climate change and direct anthropogenic impacts such as land use change, making empirical models unsuitable for simulating future risk. In this study we introduce a mechanistic hydro-epidemiological model for Liver Fluke, which explicitly simulates habitat suitability for disease development in space and time, representing the parasite life cycle in connection with key environmental conditions. The model is used to assess patterns of Liver Fluke risk for two catchments in the UK under current and potential future climate conditions. Comparisons are made with a widely used empirical model employing different datasets, including data from regional veterinary laboratories. Results suggest that mechanistic models can achieve adequate predictive ability and support adaptive fluke control strategies under climate change scenarios.

  17. The contribution of small hydro power stations to the electricity generation in Greece: Technical and economic considerations

    International Nuclear Information System (INIS)

    Kaldellis, J.K.

    2007-01-01

    Hydropower is the most widely used renewable energy source worldwide, contributing almost with 18.5% to the fulfillment of the planet electricity generation. However, most locations in Europe appropriate for the installation of large hydro power stations have already been exploited. Furthermore, there is a significant local communities' opposition towards new large power stations; hence, small hydro power stations remain one of the most attractive opportunities for further utilization of the available hydro potential. Greece and more precisely the country's mainland possesses a significant hydro-power potential which is up to now only partially exploited. In parallel, a large number of private investors have officially expressed their interest in creating small hydro power stations throughout the country, encouraged by the significant Greek State subsidy opportunities for renewable energy applications. However, up to now a relatively small number of projects have been realized, mainly due to decision-making problems, like the administrative bureaucracy, the absence of a rational national water resources management plan and the over-sizing of the proposed installations. Certainly, if the above problems are suitably treated, small hydro-power plants can be proved considerably profitable investments, contributing also remarkably to the national electricity balance and replacing heavy polluting lignite and imported oil. In the context of the above interesting issues, the present study reviews in detail the existing situation of small hydropower plants in Greece and investigates their future prospects as far as the energy, economic and environmental contribution are concerned

  18. Biofuel Crops Expansion: Evaluating the Impact on the Agricultural Water Scarcity Costs and Hydropower Production with Hydro Economic Modeling

    Science.gov (United States)

    Marques, G.

    2015-12-01

    Biofuels such as ethanol from sugar cane remain an important element to help mitigate the impacts of fossil fuels on the atmosphere. However, meeting fuel demands with biofuels requires technological advancement for water productivity and scale of production. This may translate into increased water demands for biofuel crops and potential for conflicts with incumbent crops and other water uses including domestic, hydropower generation and environmental. It is therefore important to evaluate the effects of increased biofuel production on the verge of water scarcity costs and hydropower production. The present research applies a hydro-economic optimization model to compare different scenarios of irrigated biofuel and hydropower production, and estimates the potential tradeoffs. A case study from the Araguari watershed in Brazil is provided. These results should be useful to (i) identify improved water allocation among competing economic demands, (ii) support water management and operations decisions in watersheds where biofuels are expected to increase, and (iii) identify the impact of bio fuel production in the water availability and economic value. Under optimized conditions, adoption of sugar cane for biofuel production heavily relies on the opportunity costs of other crops and hydropower generation. Areas with a lower value crop groups seem more suitable to adopt sugar cane for biofuel when the price of ethanol is sufficiently high and the opportunity costs of hydropower productions are not conflicting. The approach also highlights the potential for insights in water management from studying regional versus larger scales bundled systems involving water use, food production and power generation.

  19. HydroPak: concept design and analysis of a packaged cross-flow turbine

    International Nuclear Information System (INIS)

    2004-01-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed

  20. The Community WRF-Hydro Modeling System Version 4 Updates: Merging Toward Capabilities of the National Water Model

    Science.gov (United States)

    McAllister, M.; Gochis, D.; Dugger, A. L.; Karsten, L. R.; McCreight, J. L.; Pan, L.; Rafieeinasab, A.; Read, L. K.; Sampson, K. M.; Yu, W.

    2017-12-01

    The community WRF-Hydro modeling system is publicly available and provides researchers and operational forecasters a flexible and extensible capability for performing multi-scale, multi-physics options for hydrologic modeling that can be run independent or fully-interactive with the WRF atmospheric model. The core WRF-Hydro physics model contains very high-resolution descriptions of terrestrial hydrologic process representations such as land-atmosphere exchanges of energy and moisture, snowpack evolution, infiltration, terrain routing, channel routing, basic reservoir representation and hydrologic data assimilation. Complementing the core physics components of WRF-Hydro are an ecosystem of pre- and post-processing tools that facilitate the preparation of terrain and meteorological input data, an open-source hydrologic model evaluation toolset (Rwrfhydro), hydrologic data assimilation capabilities with DART and advanced model visualization capabilities. The National Center for Atmospheric Research (NCAR), through collaborative support from the National Science Foundation and other funding partners, provides community support for the entire WRF-Hydro system through a variety of mechanisms. This presentation summarizes the enhanced user support capabilities that are being developed for the community WRF-Hydro modeling system. These products and services include a new website, open-source code repositories, documentation and user guides, test cases, online training materials, live, hands-on training sessions, an email list serve, and individual user support via email through a new help desk ticketing system. The WRF-Hydro modeling system and supporting tools which now include re-gridding scripts and model calibration have recently been updated to Version 4 and are merging toward capabilities of the National Water Model.

  1. A hydro-optical model for deriving water quality variables from satellite images (HydroSat): A case study of the Nile River demonstrating the future Sentinel-2 capabilities

    NARCIS (Netherlands)

    Salama, M.; Radwan, M.; van der Velde, R.

    2012-01-01

    This paper describes a hydro-optical model for deriving water quality variables from satellite images, hereafter HydroSat. HydroSat corrects images for atmospheric interferences and simultaneously retrieves water quality variables. An application of HydroSat to Landsat Enhanced Thematic Mapper (ETM)

  2. HydroPak: concept design and analysis of a packaged cross-flow turbine

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed.

  3. Provincial hydro expansions

    Energy Technology Data Exchange (ETDEWEB)

    Froschauer, K J

    1993-01-01

    A study of the development of five provincial hydroelectric utilities in Canada indicates that power companies and the state invited manufacturers to use hydroelectricity and natural resources in order to diversify provincial economies. These hydro expansions also show that utilities and government designed hydro projects to serve continental requirements; serving both objectives became problematic. It is argued that when the Canadian state and firms such as utilities use hydro expansions to serve both continentalism and industrialization, then at best they foster dependent industrialization and staple processing. At worst, they overbuild the infrastructure to generate provincial surplus energy for continental, rather than national, integration. Hydro developments became subject to state intervention in Canada mainly through the failures of private utilities to provide power for the less-lucrative industrial markets within provincial subregions. Although the state and utilities invited foreign firms to manufacture hydro equipment within the provinces and others to use electricity to diversify production beyond resource processing, such a diversification did not occur. Since 1962, ca 80% of industrial energy was used to semi-process wood-derived products, chemicals, and metals. The idea for a national power network became undermined by interprovincial political-economic factors and since 1963, the federal national/continential power policy prevailed. 187 refs., 6 figs., 52 tabs.

  4. Toward hydro-social modeling: Merging human variables and the social sciences with climate-glacier runoff models (Santa River, Peru)

    Science.gov (United States)

    Carey, Mark; Baraer, Michel; Mark, Bryan G.; French, Adam; Bury, Jeffrey; Young, Kenneth R.; McKenzie, Jeffrey M.

    2014-10-01

    Glacier shrinkage caused by climate change is likely to trigger diminished and less consistent stream flow in glacier-fed watersheds worldwide. To understand, model, and adapt to these climate-glacier-water changes, it is vital to integrate the analysis of both water availability (the domain of hydrologists) and water use (the focus for social scientists). Drawn from a case study of the Santa River watershed below Peru’s glaciated Cordillera Blanca mountain range, this paper provides a holistic hydro-social framework that identifies five major human variables critical to hydrological modeling because these forces have profoundly influenced water use over the last 60 years: (1) political agendas and economic development; (2) governance: laws and institutions; (3) technology and engineering; (4) land and resource use; and (5) societal responses. Notable shifts in Santa River water use-including major expansions in hydroelectricity generation, large-scale irrigation projects, and other land and resource-use practices-did not necessarily stem from changing glacier runoff or hydrologic shifts, but rather from these human variables. Ultimately, then, water usage is not predictable based on water availability alone. Glacier runoff conforms to certain expected trends predicted by models of progressively reduced glacier storage. However, societal forces establish the legal, economic, political, cultural, and social drivers that actually shape water usage patterns via human modification of watershed dynamics. This hydro-social framework has widespread implications for hydrological modeling in glaciated watersheds from the Andes and Alps to the Himalaya and Tien Shan, as well as for the development of climate change adaptation plans.

  5. Hydro-Quebec is profitable

    International Nuclear Information System (INIS)

    Poirier, M.

    1997-01-01

    The pros and cons of the potential privatisation of Hydro-Quebec were discussed. A brief review of charges of less than competent management, low profitability and the corporation's recent administrative restructuring was presented. The general thrust of the argument was that Hydro-Quebec plays a crucial role in the economic development of Quebec, it can be made to be more profitable and that for the good of Quebec it should continue as a public corporation under the control of the provincial government

  6. Feasibility study and economic analysis of pumped hydro storage and battery storage for a renewable energy powered island

    International Nuclear Information System (INIS)

    Ma, Tao; Yang, Hongxing; Lu, Lin

    2014-01-01

    Highlights: • Batteries and pumped hydro storage schemes are examined. • Sizing procedure for each option is investigated in detail. • The two schemes are compared in terms of life cycle cost and technical viability. • Sensitivity analyses are conducted on five key input parameters. - Abstract: This study examined and compared two energy storage technologies, i.e. batteries and pumped hydro storage (PHS), for the renewable energy powered microgrid power supply system on a remote island in Hong Kong. The problems of energy storage for off-grid renewable energy were analyzed. The sizing methods and economic models were developed, and finally applied in the real project (case study). The results provide the most suitable energy storage scheme for local decision-makers. The two storage schemes were further divided into 4 options. Accordingly, the life-cycle costs (LCC), levelized costs for the renewable energy storage system (LCRES) and the LCC ratios between all options were calculated and compared. It was found that the employment of conventional battery (Option 2) had a higher LCC value than the advanced deep cycle battery (Option 1), indicating that using deep cycle batteries is more suitable for a standalone renewable power supply system. The pumped storage combined with battery bank option (Option 3) had only 55% LCC of that of Option 1, making this combined option more cost-competitive than the sole battery option. The economic benefit of pumped storage is even more significant in the case of purely pumped storage with a hydraulic controller (Option 4), with the lowest LCC among all options at 29–48% of Option 1. Sensitivity analysis demonstrates that PHS is even more cost competitive by controlling some adjustments such as increasing energy storage capacity and days of autonomy. Therefore, the renewable energy system coupled with pumped storage presents technically feasible opportunities and practical potential for continuous power supply in remote

  7. iTree-Hydro: Snow hydrology update for the urban forest hydrology model

    Science.gov (United States)

    Yang Yang; Theodore A. Endreny; David J. Nowak

    2011-01-01

    This article presents snow hydrology updates made to iTree-Hydro, previously called the Urban Forest Effects—Hydrology model. iTree-Hydro Version 1 was a warm climate model developed by the USDA Forest Service to provide a process-based planning tool with robust water quantity and quality predictions given data limitations common to most urban areas. Cold climate...

  8. Environmental-impact assessment of hydro-power in Egypt

    International Nuclear Information System (INIS)

    Rashad, S.M.; Ismail, M.A.

    2000-01-01

    The environmental impact of energy production and use with the associated emissions of greenhouse gases, particularly CO 2 , has created much attention and growing concern at both national and international levels. In Egypt, efforts have been directed to incorporate the environment-protection issues within the overall planning of the energy sector, as appropriate to its national commitment and its techno-economic considerations. Over the past decade, 1985-1995, hydro-power had contributed between 28 and 22% of the total energy produced by Egyptian power-plants, while the contribution of the hydro capacity was between 32.4 and 21.5%. Many studies have been carried out on the impacts of the Aswan High Dam on various aspects of the environment. An objective evaluation of the Dam, based on 25 years of operational data, indicated that it has overall been positive even though it has contributed to some environmental problems. These problems, however, are significantly less than most people originally expected. This paper deals with the review and analysis of the detrimental effects of hydro-power in Egypt. An evaluation will be given of the emissions of greenhouse gases from the whole hydro-chain. (Author)

  9. BC Hydro triple bottom line report 2002

    International Nuclear Information System (INIS)

    Anon

    2002-08-01

    British Columbia Hydro (BC Hydro) published this document which measures the environmental, social and economic performance of the company. It is a complement to BC Hydro's 2002 Annual Report. The report was prepared to better understand the company's business in terms of its commitment to being an environmentally, socially, and economically responsible company (the three bottom lines). BC Hydro proved its ability to integrate the three bottom lines in decision making processes by carefully examining the environmental, social and economical impacts of programs such as Power Smart, Green and Alternative Energy, and Water Use Planning. All indicators point to BC Hydro achieving its commitment of providing a minimum of 10 per cent of new demand through 2010 with new green energy sources. Water Use Plans were developed for hydroelectric generating stations, and they should all be in place by 2003. Efficiencies realised through the Power Smart program offset the increases in greenhouse gas associated with increased energy demand. Juvenile sturgeon raised in a hatchery were released into the Columbia River in May 2002. The completion of a 40-kilometre trail on the Sunshine Coast was helped by a financial contribution from BC Hydro in the amount of 23,000 dollars. Safety improvements were implemented at eight facilities, such as dam remediation, dam surveillance and instrumentation updates. Scholarships were awarded across the province, along with additional donations to non-profit organizations. Co-op positions were provided for 150 students. Internal energy efficiency programs were successful. Planning is under way for significant maintenance work and equipment replacement projects as the transmission and distribution infrastructure ages. The number of reported indicators was expanded this year. In turn, they were aligned with the revised Global Reporting Initiative (GRI) guidelines. tabs

  10. HydroCube: an entity-relationship hydrogeological data model

    Science.gov (United States)

    Wojda, Piotr; Brouyère, Serge; Derouane, Johan; Dassargues, Alain

    2010-12-01

    Managing, handling and accessing hydrogeological information depends heavily on the applied hydrogeological data models, which differ between institutions and countries. The effective dissemination of hydrogeological information requires the convergence of such models to make hydrogeological information accessible to multiple users such as universities, water suppliers, and administration and research organisations. Furthermore, because hydrogeological studies are complex, they require a wide variety of high-quality hydrogeological data with appropriate metadata in clearly designed and coherent structures. A need exists, therefore, to develop and implement hydrogeological data models that cover, as much as possible, the full hydrogeological domain. A new data model, called HydroCube, was developed for the Walloon Region in Belgium in 2005. The HydroCube model presents an innovative holistic project-based approach which covers a full set of hydrogeological concepts and features, allowing for effective hydrogeological project management. The model stores data relating to the project locality, hydrogeological equipment, and related observations and measurements. In particular, it focuses on specialized hydrogeological field experiments such as pumping and tracer tests. This logical data model uses entity-relationship diagrams and it has been implemented in the Microsoft Access environment. It has been enriched with a fully functional user interface.

  11. Hydro-Quebec strategic plan 2006-2010

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec produces, transmits and distributes electricity through the use of renewable energy sources, particularly hydroelectricity. It also conducts research in energy related fields. This document listed the strategic plan for Hydro-Quebec's 4 main divisions: Hydro-Quebec Production, Hydro-Quebec TransEnergie, Hydro-Quebec Distribution and Hydro-Quebec Energy Society of Bay James. The 2006 to 2010 strategic plan continues to focus on 3 main priorities: energy efficiency; complementary development of hydroelectricity and wind power; and, technological innovation. Hydro-Quebec's objectives also include strengthening the security of Quebec's energy supply and making use of energy as a lever for economic development. The plan for Hydro-Quebec Production calls for accelerating the development of major hydroelectric projects and promoting other renewable forms of energy such as wind power and ensuring the efficiency and reliability of the generating fleet. The utility's objective is to reach 4.7 TWh in energy savings by 2010 and to work toward a target of 8 TWh by 2015. The plan also involves a portfolio of hydroelectric projects totaling 5,400 MW. The plan includes complementary development and integration of 4,000 MW of windpower by 2015. The plan for Hydro-Quebec TransEnergie calls for system reliability and becoming a world benchmark for quality and reliability in wind power integration and deployment of new technologies to enhance performance. The plan for Hydro-Quebec Distribution calls for more efficient use of electricity, increase customer satisfaction and meet electricity needs through the use of renewable energy sources. The utility has made a commitment for 2006 to 2010 to a net income of $2.5 billion per year for a total of $12.5 billion, and a capital investment of 19.4 billion. This paper outlined the contribution of each division to net income and listed the economic benefits for the 2006 to 2010 period. In 2006, the Quebec Energy Board authorized

  12. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    OpenAIRE

    Febijanto, Irhan

    2013-01-01

    Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from ...

  13. HydroShare for iUTAH: Collaborative Publication, Interoperability, and Reuse of Hydrologic Data and Models for a Large, Interdisciplinary Water Research Project

    Science.gov (United States)

    Horsburgh, J. S.; Jones, A. S.

    2016-12-01

    Data and models used within the hydrologic science community are diverse. New research data and model repositories have succeeded in making data and models more accessible, but have been, in most cases, limited to particular types or classes of data or models and also lack the type of collaborative, and iterative functionality needed to enable shared data collection and modeling workflows. File sharing systems currently used within many scientific communities for private sharing of preliminary and intermediate data and modeling products do not support collaborative data capture, description, visualization, and annotation. More recently, hydrologic datasets and models have been cast as "social objects" that can be published, collaborated around, annotated, discovered, and accessed. Yet it can be difficult using existing software tools to achieve the kind of collaborative workflows and data/model reuse that many envision. HydroShare is a new, web-based system for sharing hydrologic data and models with specific functionality aimed at making collaboration easier and achieving new levels of interactive functionality and interoperability. Within HydroShare, we have developed new functionality for creating datasets, describing them with metadata, and sharing them with collaborators. HydroShare is enabled by a generic data model and content packaging scheme that supports describing and sharing diverse hydrologic datasets and models. Interoperability among the diverse types of data and models used by hydrologic scientists is achieved through the use of consistent storage, management, sharing, publication, and annotation within HydroShare. In this presentation, we highlight and demonstrate how the flexibility of HydroShare's data model and packaging scheme, HydroShare's access control and sharing functionality, and versioning and publication capabilities have enabled the sharing and publication of research datasets for a large, interdisciplinary water research project

  14. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  15. Optimal control systems in hydro power plants

    International Nuclear Information System (INIS)

    Babunski, Darko L.

    2012-01-01

    The aim of the research done in this work is focused on obtaining the optimal models of hydro turbine including auxiliary equipment, analysis of governors for hydro power plants and analysis and design of optimal control laws that can be easily applicable in real hydro power plants. The methodology of the research and realization of the set goals consist of the following steps: scope of the models of hydro turbine, and their modification using experimental data; verification of analyzed models and comparison of advantages and disadvantages of analyzed models, with proposal of turbine model for design of control low; analysis of proportional-integral-derivative control with fixed parameters and gain scheduling and nonlinear control; analysis of dynamic characteristics of turbine model including control and comparison of parameters of simulated system with experimental data; design of optimal control of hydro power plant considering proposed cost function and verification of optimal control law with load rejection measured data. The hydro power plant models, including model of power grid are simulated in case of island ing and restoration after breakup and load rejection with consideration of real loading and unloading of hydro power plant. Finally, simulations provide optimal values of control parameters, stability boundaries and results easily applicable to real hydro power plants. (author)

  16. Liquid assets: factors contributing to the development of small hydro in China

    International Nuclear Information System (INIS)

    Pan, D.

    2006-01-01

    The rapid growth of small hydro capacity in China is reviewed. At present, the annual generation from rural small hydropower in China equates with the saving of 44 million tonnes of coal, or the emission of 110 million tonnes of carbon dioxide. Other environmental advantages such as a reduction in wood burning, reduced logging and therefore reduced soil erosion, are mentioned. Energy-starved China stood to gain much from the development of small hydro systems and government policy has been supportive in terms of relatively low tax rates and low interest loans. It is expected that due to the rapid economic growth in China, small-scale hydro will maintain its present level of development and continue to be promoted in a sound and rational manner. (author)

  17. Energy supply technologies. Hydro, ocean, wave and tidal

    Energy Technology Data Exchange (ETDEWEB)

    Fenhann, J.; Larsen, Hans [Risoe National Lab. - DTU (Denmark)

    2007-11-15

    This chapter presents an overview of current hydro, ocean, wave and tidal initiatives. Large hydro remains one of the lowest-cost generating technologies, although environmental constraints, resettlement impacts and the limited availability of sites have restricted further growth in many countries. Large hydro supplied 16 % of global electricity in 2004, down from 19 % a decade ago. Large hydro capacity totalled about 720 GW worldwide in 2004 and has grown historically at slightly more than 2 % annually. China installed nearly 8 GW of large hydro in 2004, taking the country to number one in terms of installed capacity (74 GW). With the completion of the Three Gorges Dam, China will add some 18.2 GW of hydro capacity in 2009. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic cost of hydro includes displacements and submergence. Further hydro can improve peak-capacity management. Ocean currents, some of which runs close to European coasts, carry a lot of kinetic energy. Part of this energy can be captured by sub-marine windmills and converted into electricity. These are more compact than the wind turbines used on land, simply because water is much denser than air. The main European countries with useful current power potential are France and the UK. Ocean tides are driven by the gravitational pull of the moon. With one high tide every 12 hours, a tidal power plant can operate for only four or five hours per cycle, so power from a single plant is intermittent. A suitably-designed tidal plant can, however, operate as a pimped storage system, using electricity during periods of low demand to store energy that can be recovered later. The only large, modern example of a tidal power plant is the 240 MW La Rance plant, built in France in the 1960s, which represents 91 % of the world tidal power capacity. Wave energy can be seen as

  18. Multi-scale modelling of the hydro-mechanical behaviour of argillaceous rocks

    International Nuclear Information System (INIS)

    Van den Eijnden, Bram

    2015-01-01

    Feasibility studies for deep geological radioactive waste disposal facilities have led to an increased interest in the geomechanical modelling of its host rock. In France, a potential host rock is the Callovo-Oxfordian clay-stone. The low permeability of this material is of key importance, as the principle of deep geological disposal strongly relies on the sealing capacity of the host formation. The permeability being coupled to the mechanical material state, hydro-mechanical coupled behaviour of the clay-stone becomes important when mechanical alterations are induced by gallery excavation in the so-called excavation damaged zone (EDZ). In materials with microstructure such as the Callovo-Oxfordian clay-stone, the macroscopic behaviour has its origin in the interaction of its micromechanical constituents. In addition to the coupling between hydraulic and mechanical behaviour, a coupling between the micro (material microstructure) and macro scale will be made. By means of the development of a framework of computational homogenization for hydro-mechanical coupling, a double-scale modelling approach is formulated, for which the macro-scale constitutive relations are derived from the microscale by homogenization. An existing model for the modelling of hydro-mechanical coupling based on the distinct definition of grains and intergranular pore space is adopted and modified to enable the application of first order computational homogenization for obtaining macro-scale stress and fluid transport responses. This model is used to constitute a periodic representative elementary volume (REV) that allows the representation of the local macroscopic behaviour of the clay-stone. As a response to deformation loading, the behaviour of the REV represents the numerical equivalent of a constitutive relation at the macro-scale. For the required consistent tangent operators, the framework of computational homogenization by static condensation is extended to hydro-mechanical coupling. The

  19. The hydro-mechanical modeling of the fractured media; Modelisation hydromecanique des milieux fractures

    Energy Technology Data Exchange (ETDEWEB)

    Kadiri, I

    2002-10-15

    The hydro-mechanical modeling of the fractured media is quite complex. Simplifications are necessary for the modeling of such media, but, not always justified, Only permeable fractures are often considered. The rest of the network is approximated by an equivalent continuous medium. Even if we suppose that this approach is validated, the hydraulic and mechanical properties of the fractures and of the continuous medium are seldom known. Calibrations are necessary for the determination of these properties. Until now, one does not know very well the nature of measurements which must be carried out in order to carry on a modeling in discontinuous medium, nor elements of enough robust validation for this kind of modeling. For a better understanding of the hydro-mechanical phenomena in fractured media, two different sites have been selected for the work. The first is the site of Grimsel in Switzerland in which an underground laboratory is located at approximately 400 m of depth. The FEBEX experiment aims at the in-situ study of the consecutive phenomena due to the installation of a heat source representative of radioactive waste in the last 17 meters of the FEBEX tunnel in the laboratory of Grimsel. Only, the modeling of the hydro-mechanical of the excavation was model. The modeling of the Febex enabled us to establish a methodology of calibration of the hydraulic properties in the discontinuous media. However, this kind of study on such complex sites does not make possible to answer all the questions which arise on the hydro-mechanical behavior of the fractured media. We thus carried out modeling on an other site, smaller than the fist one and more accessible. The experimental site of Coaraze, in the Maritime Alps, is mainly constituted of limestone and fractures. Then the variation of water pressure along fractures is governed by the opening/closure sequence of a water gate. Normal displacement as well as the pore pressure along these fractures are recorded, and then

  20. Modeling detailed hydro-meteorological surfaces and runoff response in large diverse watersheds

    International Nuclear Information System (INIS)

    Byrne, J.; Kienzle, S.W.; MacDonald, R.J.

    2008-01-01

    An understanding of local variability in climatic conditions over complex terrain is imperative to making accurate assessments of impacts from climate change on fresh water ecosystems (Daly, 2006). The derivation of representative spatial data in diverse environments poses a significant challenge to the modelling community. This presentation describes the current status of a long term ongoing hydro-climate model development program. We are developing a gridded hydroclimate dataset for diverse watersheds using SimGrid (Larson, 2008; Lapp et al., 2005; Sheppard, 1996), a model that applies the Mountain Climate Model (MTCLIM; Hungerford et al., 1989) to simulate hydro-climatic conditions over diverse terrain. The model uses GIS based terrain categories (TC) classified by slope, aspect, elevation, and soil water storage. SimGrid provides daily estimates of solar radiation, air temperature, relative humidity, precipitation, snowpack and soil water storage over space. Earlier versions of the model have been applied in the St. Mary (Larson, 2008) and upper Oldman basins (Lapp et al., 2005), giving realistic estimates of hydro-climatic variables. The current study demonstrates improvements to the estimation of temperature, precipitation, snowpack, soil water storage and runoff from the basin. Soil water storage data for the upper drainage were derived with GIS and included in SimGrid to estimate soil water flux over the time period. These changes help improve the estimation of spatial climatic variability over the basin while accounting for topographical influence. In further work we will apply spatial hydro-climatic surfaces from the SimGrid model to assess the hydrologic response to environmental change for watersheds in Canada and beyond. (author)

  1. Hydro-Quebec's buyback tariff

    International Nuclear Information System (INIS)

    Richard, J.C.

    1992-01-01

    Hydro-Quebec had an installed electric generation capacity of 25,682 MW in 1990, of which 23,927 MW was hydraulic. Of the 26 thermal power plants, 22 are in remote communities on islands or in the north part of the province. The utility's development plan predicts an annual growth in demand of 2.6% to reach ca 200 TWh in 2006; this demand would be reduced to ca 180 TWh by energy efficiency measures. To increase capacity, Hydro-Quebec can utilize the hydro generation potential of its large rivers, of which 18,000 MW is economically viable, and its small rivers. Of the 10,000 MW theoretical potential of the latter, a large fraction cannot be economically developed under existing conditions. The utility has a policy to purchase energy as a function of the price of fossil fuel. For wind energy, this price was 4.22 cents/kWh in 1991; this price will be increased annually according to the inflation index. In its isolated sites such as the Magdalen Islands, current costs of diesel-generated electricity are at least 5.5 cents/kWh. There are possibilities for installing wind plants in isolated regions but their automatic control systems need to be improved for achieving a larger utilization factor relative to diesel generation and their cost needs to be reduced. 1 tab

  2. Hydro-power

    International Nuclear Information System (INIS)

    Piro, P.

    2010-01-01

    On average the hydro-power sector produces 12% of the electrical power in France. A quarter of this production might pass to another operator than EDF because the end of some grants is nearing (2012 for 12 installations). In France the power of rivers belongs to the state that gives operators grants to harness it. The allowance lasts 75 years usually but for installations below 4.5 MW a permanent and definitive grant is allowed. Most installations are ancient and their investment have been paid off since a long, so hydro-power is the most profitable renewable energy in France. A lot of bidders are expected. Each bid will be assessed on 3 criteria: -) the global energy efficiency of the waterfall, -) a balanced management of the water resource, and -) an economic and financial offer to the state. The balance between the different uses of water is getting more delicate to reach and this renewal of grants will be an opportunity for the state to impose a better preservation of the environment. In July 2008, the French government announced a program for the re launching of the hydro-power, this program has been reduced and now only 3000 GWh supplementary are expected by 2020. (A.C.)

  3. Overview of Hydrometeorologic Forecasting Procedures at BC Hydro

    Science.gov (United States)

    McCollor, D.

    2004-12-01

    Energy utility companies must balance production from limited sources with increasing demand from industrial, business, and residential consumers. The utility planning process requires a balanced, efficient, and effective distribution of energy from source to consumer. Therefore utility planners must consider the impact of weather on energy production and consumption. Hydro-electric companies should be particularly tuned to weather because their source of energy is water, and water supply depends on precipitation. BC Hydro operates as the largest hydro-electric company in western Canada, managing over 30 reservoirs within the province of British Columbia, and generating electricity for 1.6 million people. BC Hydro relies on weather forecasts of watershed precipitation and temperature to drive hydrologic reservoir inflow models and of urban temperatures to meet energy demand requirements. Operations and planning specialists in the company rely on current, value-added weather forecasts for extreme high-inflow events, daily reservoir operations planning, and long-term water resource management. Weather plays a dominant role for BC Hydro financial planners in terms of sensitive economic responses. For example, a two percent change in hydropower generation, due in large part to annual precipitation patterns, results in an annual net change of \\50 million in earnings. A five percent change in temperature produces a \\5 million change in yearly earnings. On a daily basis, significant precipitation events or temperature extremes involve potential profit/loss decisions in the tens of thousands of dollars worth of power generation. These factors are in addition to environmental and societal costs that must be considered equally as part of a triple bottom line reporting structure. BC Hydro water resource managers require improved meteorological information from recent advancements in numerical weather prediction. At BC Hydro, methods of providing meteorological forecast data

  4. Revisiting Renewable Energy Map in Indonesia: Seasonal Hydro and Solar Energy Potential for Rural Off-Grid Electrification (Provincial Level

    Directory of Open Access Journals (Sweden)

    Agung Wahyuono Ruri

    2018-01-01

    Full Text Available Regarding the acceleration of renewable energy diffusion in Indonesia as well as achieving the national energy mix target, renewable energy map is essential to provide useful information to build renewable energy system. This work aims at updating the renewable energy potential map, i.e. hydro and solar energy potential, with a revised model based on the global climate data. The renewable energy map is intended to assist the design off-grid system by hydropower plant or photovoltaic system, particularly for rural electrification. Specifically, the hydro energy map enables the stakeholders to determine the suitable on-site hydro energy technology (from pico-hydro, micro-hydro, mini-hydro to large hydropower plant. Meanwhile, the solar energy map depicts not only seasonal solar energy potential but also estimated energy output from photovoltaic system.

  5. hydroPSO: A Versatile Particle Swarm Optimisation R Package for Calibration of Environmental Models

    Science.gov (United States)

    Zambrano-Bigiarini, M.; Rojas, R.

    2012-04-01

    Particle Swarm Optimisation (PSO) is a recent and powerful population-based stochastic optimisation technique inspired by social behaviour of bird flocking, which shares similarities with other evolutionary techniques such as Genetic Algorithms (GA). In PSO, however, each individual of the population, known as particle in PSO terminology, adjusts its flying trajectory on the multi-dimensional search-space according to its own experience (best-known personal position) and the one of its neighbours in the swarm (best-known local position). PSO has recently received a surge of attention given its flexibility, ease of programming, low memory and CPU requirements, and efficiency. Despite these advantages, PSO may still get trapped into sub-optimal solutions, suffer from swarm explosion or premature convergence. Thus, the development of enhancements to the "canonical" PSO is an active area of research. To date, several modifications to the canonical PSO have been proposed in the literature, resulting into a large and dispersed collection of codes and algorithms which might well be used for similar if not identical purposes. In this work we present hydroPSO, a platform-independent R package implementing several enhancements to the canonical PSO that we consider of utmost importance to bring this technique to the attention of a broader community of scientists and practitioners. hydroPSO is model-independent, allowing the user to interface any model code with the calibration engine without having to invest considerable effort in customizing PSO to a new calibration problem. Some of the controlling options to fine-tune hydroPSO are: four alternative topologies, several types of inertia weight, time-variant acceleration coefficients, time-variant maximum velocity, regrouping of particles when premature convergence is detected, different types of boundary conditions and many others. Additionally, hydroPSO implements recent PSO variants such as: Improved Particle Swarm

  6. Improved cyberinfrastructure for integrated hydrometeorological predictions within the fully-coupled WRF-Hydro modeling system

    Science.gov (United States)

    gochis, David; hooper, Rick; parodi, Antonio; Jha, Shantenu; Yu, Wei; Zaslavsky, Ilya; Ganapati, Dinesh

    2014-05-01

    The community WRF-Hydro system is currently being used in a variety of flood prediction and regional hydroclimate impacts assessment applications around the world. Despite its increasingly wide use certain cyberinfrastructure bottlenecks exist in the setup, execution and post-processing of WRF-Hydro model runs. These bottlenecks result in wasted time, labor, data transfer bandwidth and computational resource use. Appropriate development and use of cyberinfrastructure to setup and manage WRF-Hydro modeling applications will streamline the entire workflow of hydrologic model predictions. This talk will present recent advances in the development and use of new open-source cyberinfrastructure tools for the WRF-Hydro architecture. These tools include new web-accessible pre-processing applications, supercomputer job management applications and automated verification and visualization applications. The tools will be described successively and then demonstrated in a set of flash flood use cases for recent destructive flood events in the U.S. and in Europe. Throughout, an emphasis on the implementation and use of community data standards for data exchange is made.

  7. Comparison between dynamic programming and genetic algorithm for hydro unit economic load dispatch

    Directory of Open Access Journals (Sweden)

    Bin Xu

    2014-10-01

    Full Text Available The hydro unit economic load dispatch (ELD is of great importance in energy conservation and emission reduction. Dynamic programming (DP and genetic algorithm (GA are two representative algorithms for solving ELD problems. The goal of this study was to examine the performance of DP and GA while they were applied to ELD. We established numerical experiments to conduct performance comparisons between DP and GA with two given schemes. The schemes included comparing the CPU time of the algorithms when they had the same solution quality, and comparing the solution quality when they had the same CPU time. The numerical experiments were applied to the Three Gorges Reservoir in China, which is equipped with 26 hydro generation units. We found the relation between the performance of algorithms and the number of units through experiments. Results show that GA is adept at searching for optimal solutions in low-dimensional cases. In some cases, such as with a number of units of less than 10, GA's performance is superior to that of a coarse-grid DP. However, GA loses its superiority in high-dimensional cases. DP is powerful in obtaining stable and high-quality solutions. Its performance can be maintained even while searching over a large solution space. Nevertheless, due to its exhaustive enumerating nature, it costs excess time in low-dimensional cases.

  8. Rural hydro technology

    International Nuclear Information System (INIS)

    Fowlie, M.

    1999-01-01

    This paper examines the increasing use of micro hydroelectric schemes for power generation in mountainous communities in Asia to alleviate some of the pressures on forests. An example of such a scheme in Pakistan is given, and the installation and operation of small hydro units, socio-economic factors, and the impact of the projects on the position of women in the community are discussed. (UK)

  9. Perceived risk of nuclear and hydro electrical power generation in Colombia

    International Nuclear Information System (INIS)

    Munera, H.A.

    1982-12-01

    This report deals with the estimation of risk factors of hydro plants and the perception of risks and benefits of nuclear, hydropower and coal by a selected part of the public. Historical data (1922 - 1979) on occurrence of earthquakes in Colombia demonstrate high seismicity (3,489 incidents) for the country in total and also for areas where the majority of hydro projects are to be located. Model-based calculations of regional probabilities for earthquakes at prospective dam-sites with a magnitude of 7 (Richter scale) or larger resulted in p=0.038/year for a 50 year recurrence period for high and p=0.0004/year for low seismicity areas. Attitudes towards three energy systems were elicited from 130 university students and graduates with a questionnaire based on a psychometric model. Generally attitudes were most favourable towards hydro, less favourable towards coal and more critical towards nuclear. Nuclear is perceived to have economic advantages, but to pose environmental, individual and societal risks. Respondents PRO and CON nuclear agree on the lack of risk from hydropower

  10. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  11. Analyze the factors effecting the development of hydro power projects in hydro rich regions of India

    Directory of Open Access Journals (Sweden)

    Ameesh Kumar Sharma

    2016-09-01

    Full Text Available Power is considered as the major back bone for all the nations throughout the world including India on the basis of which development of the country depends. If a country has the resources to generate the power at competitive price in that case the people of the country get the benefits in terms of improvement in their social and economical life. When we talk about India, various locations in the country where still there is no electricity people are living in dark without having the access of the modern technology. The total hydro power potential of India is 1, 50,000 MW out of this total hydro potential only 40,195 MW is exploited till 2014. More than 80% of the total hydro potential of the country is lying in the western Himalayan states (Jammu and Kashmir, Himachal Pradesh, Uttrakhand and Arunachal Pradesh. Small hydro projects are also playing a very important role in the modern world for the development of the remote areas which are not main grid connected specially in western Himalayan region of India. India has a total potential 19,749 MW of small hydro projects and of this total potential only 3990.9 MW harnessed till 2014. Ministry of new and renewable energy in India is also providing special incentives to hydro rich states of India. In this research article we are taken the case study of the small hydro projects in the western Himalayan region because theses states are having vast small hydro potential which is still needed to be harnessed. So, it is very important to identify the factors which are effecting the development of these small ventures especially in western Himalayan region in India.

  12. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  13. The Modeling and Simulation of Thermal Analysis at Hydro Generator Stator Winding Insulation

    Directory of Open Access Journals (Sweden)

    Mihaela Raduca

    2006-10-01

    Full Text Available This paper presents the modelling and simulation of thermal analysis at hydro generator stator winding. The winding stator is supplied at high voltage of 11 kV for high power hydro generator. To present the thermal analysis for stator winding is presented at supply of coil by 11 kV, when coil is heat and thermal transfer in insulation at ambient temperature.

  14. Remote micro hydro

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    The micro-hydro project, built on a small tributary of Cowley Creek, near Whitehorse, Yukon, is an important step in the development of alternative energy sources and in conserving expensive diesel fuel. In addition to demonstrating the technical aspects of harnessing water power, the project paved the way for easier regulatory procedures. The power will be generated by a 9 meter head and a 6 inch crossflow turbine. The 36 V DC power will be stored in three 12 V batteries and converted to ac on demand by a 3,800 watt inverter. The system will produce 1.6 kW or 14,016 kWh per year with a firm flow of 1.26 cfs. This is sufficient to supply electricity for household needs and a wood working shop. The project is expected to cost about $18,000 and is more economical than tying into the present grid system, or continuing to use a gasoline generator. An environmental study determined that any impact of the project on the stream would be negligible. It is expected that no other water users will be affected by the project. This pilot project in micro-hydro applications will serve as a good indicator of the viability of this form of alternate energy in the Yukon. The calculations comparing the micro-hydro and grid system indicate that the mico-hydro system is a viable source of inflation-proof power. Higher heads and larger flow resulting in ac generation in excess of 10 kW would yield much better returns than this project. 3 tabs.

  15. Hydro-power: a long history, a bright future

    Energy Technology Data Exchange (ETDEWEB)

    Deudney, D

    1981-07-01

    A brief history of the spread of hydro-power in the world was given. Tables showing hydro-power potential and use, and the % electricity from hydro-power for 13 countries were included along with a graph showing % hydro-power operating, planned and under construction by region. The need for committed and farsighted political leadership for future development and the possibility of hydro production reaching 4 to 6 times its present level were discussed.

  16. Fixing hydro - The forgotten renewable

    International Nuclear Information System (INIS)

    Nalder, N.

    1992-01-01

    Since the dawn of civilization, man has captured the energy potential of falling water, from the water wheels in the fertile crescent of ancient times to today's highly sophisticated conventional and pumped storage projects. As we approach the 21st century, electric energy captured from falling water provides 2.0 trillion kilowatt-hours (21.23 quadrillion Btu), roughly 20% of the world's electric energy. Of the 2.56 billion kilowatts of the world's installed electric generating capacity, hydropower accounts for 24%. Between 1980 and 1989, world generation of hydroelectric power rose from 1.7 trillion kWh to 2.0 trillion kWh. As of January 1, 1988, the US has 90.5 million kW of installed hydro capacity - 70.8 million kW of it under license by the Federal Energy Regulatory Commission - with annual generation estimated at just under 300 billion kWh. Hydro's share, which not long ago comprised 13% of the nation's total capacity, now is just a 9% share. The US has the option to choose one or another path for hydro. If policy makers are willing to coast on a cushion of cheap natural gas, they will continue to shun hydro and put obstacles in its path. But if they come to regard hydro as an attractive resource - as they did only recently - economically and environmentally, they will encourage more balance in resource policies. Believing that interest in a balanced national resource portfolio will grow, the author reviews the past and suggests a possible future course of reasonable development for hydro. The article concludes with some suggested principles that will be needed if the appropriate balance is to be found

  17. Analysis of the Hydro-Quebec development plan 1992-2010

    International Nuclear Information System (INIS)

    Bernard, J.-T.; Genest-Laplante, E.

    1994-01-01

    In November 1992, the Quebec provincial utility Hydro-Quebec presented its development plan for the 1992-2010 period and shortly thereafter introduced its 1993-1995 energy efficiency commitments. The plan is analyzed using a model that incorporates the main institutional features of electricity price setting. Two scenarios are constructed. The first incorporates Hydro-Quebec's electricity demand forecast and the second allows electricity demand to respond to its price. A comparative analysis shows that electricity demand in the province should increase faster than forecast by Hydro-Quebec until 2010. In fact, demand could exceed the predicted level by ca 16 TWh, or 8.6%. This larger increase is due to a fall in the real price of electricity, itself caused by a government imposed fall in the real unit cost of the utility's operation. This last constraint is the real challenge faced by Hydro-Quebec. 12 refs., 7 tabs

  18. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2006-01-01

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We use a method based on nonlinear programming (NLP), namely quadratic programming, to consider hydroelectric power generation a function of water discharge and of the head. The method has been applied successfully to solve a test case based on a realistic cascaded hydro system with a negligible computational time requirement and is also applied to show that the role played by reservoirs in the hydro chain do not depend only on their relative position. As a new contribution to earlier studies, which presented reservoir operation rules mainly for medium and long-term planning procedures, we show that the physical data defining hydro chain parameters used in the nonlinear model have an effect on the STHS, implying different optimal storage trajectories for the reservoirs accordingly not only with their position in the hydro chain but also with the new parameterisation defining the data for the hydro system. Moreover, considering head dependency in the hydroelectric power generation, usually neglected for hydro plants with a large storage capacity, provides a better short-term management of the conversion of the potential energy available in the reservoirs into electric energy, which represents a major advantage for the hydroelectric utilities in a competitive electricity market. (author)

  19. Dead battery? Wind power, the spot market, and hydro power interaction in the Nordic electricity market

    OpenAIRE

    Mauritzen, Johannes

    2011-01-01

    It is well established within both the economics and power system engineering literature that hydro power can act as a complement to large amounts of intermittent energy. In particular hydro power can act as a "battery" where large amounts of wind power are installed. In this paper I use simple distributed lag models with data from Denmark and Norway. I find that increased wind power in Denmark causes increased marginal exports to Norway and that this effect is larger during periods of net ex...

  20. Hydro and nuclear power for African less-carbon development

    Energy Technology Data Exchange (ETDEWEB)

    El-Gazzar, Mohamed; Ibrahim, Yassin Mohamed; Bedrous, Maher Aziz

    2007-07-01

    Though the overall picture reveal availability of enormous energy resources which far exceed energy requirements of Africa, most of these resources are grossly underutilized, particularly hydro and nuclear resources. It suggests that Africa's problem is not lack of energy resources but its development and utilization. The region will remain a major net exporter of energy for several decades to com. In dealing with its energy problems Africa faces a unique set of initial conditions, defined mainly by its level and pattern of economic growth, social and demographic characteristics, energy resource endowment, location distances between supply sources and consumption areas, technological underdevelopment, and poverty-driven energy-environment conflict. A key challenge is the optimal utilization of the Africa's energy resources to facilitate both individual country and regional energy and economic development. Stronger emphasis on a more integrated energy supply network based on more widespread regional initiatives, particularly in electricity is essential to sustainable energy development in Africa. This paper discusses the prospects for hydro and nuclear power in Africa. The continent is the poorest in the world. The lack of reliable, accessible and affordable energy hinders its development. Hydro and nuclear power promises to be the least-carbon energy sources, while being the cheapest and most reliable among all. The role the hydropower can play in securing a sustainable energy future for Africa is highly emphasized. Also, nuclear power has many advantages to Africa. Opportunities for hydropower and nuclear power in Africa are all considered. Advantages and disadvantages are also all discussed. (auth)

  1. Game Theoretic Modeling of Water Resources Allocation Under Hydro-Climatic Uncertainty

    Science.gov (United States)

    Brown, C.; Lall, U.; Siegfried, T.

    2005-12-01

    Typical hydrologic and economic modeling approaches rely on assumptions of climate stationarity and economic conditions of ideal markets and rational decision-makers. In this study, we incorporate hydroclimatic variability with a game theoretic approach to simulate and evaluate common water allocation paradigms. Game Theory may be particularly appropriate for modeling water allocation decisions. First, a game theoretic approach allows economic analysis in situations where price theory doesn't apply, which is typically the case in water resources where markets are thin, players are few, and rules of exchange are highly constrained by legal or cultural traditions. Previous studies confirm that game theory is applicable to water resources decision problems, yet applications and modeling based on these principles is only rarely observed in the literature. Second, there are numerous existing theoretical and empirical studies of specific games and human behavior that may be applied in the development of predictive water allocation models. With this framework, one can evaluate alternative orderings and rules regarding the fraction of available water that one is allowed to appropriate. Specific attributes of the players involved in water resources management complicate the determination of solutions to game theory models. While an analytical approach will be useful for providing general insights, the variety of preference structures of individual players in a realistic water scenario will likely require a simulation approach. We propose a simulation approach incorporating the rationality, self-interest and equilibrium concepts of game theory with an agent-based modeling framework that allows the distinct properties of each player to be expressed and allows the performance of the system to manifest the integrative effect of these factors. Underlying this framework, we apply a realistic representation of spatio-temporal hydrologic variability and incorporate the impact of

  2. Effect of aqueous and hydro-alcoholic extracts of lettuce (Lactuca sativa) seed on testosterone level and spermatogenesis in NMRI mice.

    Science.gov (United States)

    Ahangarpour, Akram; Oroojan, Ali Akbar; Radan, Maryam

    2014-01-01

    One of the considerable uses of lettuce (Lactuca sativa) seed in traditional medicine has been to reduce semen, sperm and sexuality. The aim of this study was to investigate the effects of aqueous and hydro-alcoholic extracts of lettuce seed on testosterone level and spermatogenesis. In this experimental study 24 adult male NMRI mice weighing 20-25gr were purchased. Animals were randomly divided into 4 groups: controls, hydro-alcoholic (200 mg/kg) and aqueous extracts (50, 100mg/kg). The extracts were injected intraperitoneally once a day for 10 consecutive days. 2 weeks after the last injection, the mice were anaesthetized by ether and after laparatomy blood was collected from the heart to determine testosterone by ELISA assay kit. Then testis and cauda epididymis of all animals were removed for analyzing testis morphology and sperm count and viability. Testis weight in hydro-alcoholic and aqueous extracts 100 mg/kg (p=0.001) and aqueous extract 50 mg/kg (p=0.008) groups was increased. Sperm viability in hydro-alcoholic (p=0.001) and aqueous extracts 50 (p=0.026), 100 mg/kg (p=0.045) groups was decreased, Also the results showed a significant decrease in sperm count in hydro-alcoholic (p=0.035) and aqueous extracts 50 mg/kg (p=0.006) groups in comparison with control group. Also there was a significant increase in serum level of testosterone in aqueous extract 50 mg/kg group in comparison with control (p=0.002) hydro-alcoholic (p=0.001) and aqueous extracts 100 mg/kg (p=0.003) groups. Present results demonstrated that hydro-alcoholic and aqueous 50 mg/kg extracts of lettuce seed have antispermatogenic effects, also aqueous extract 50 mg/kg increased serum level of testosterone in mice. Therefore we can suggest that lettuce seed could be a potential contraceptive agent. This article extracted from M.Sc. student research project. (Ali Akbar Oroojan).

  3. Hydro energetic inventory study from Chapecozinho river

    International Nuclear Information System (INIS)

    Pimenta, S.C.; Sureck, M.A.A.; Nascimento, P.R.; Kawasaki, M.; Silva Felipe, R. da.

    1990-01-01

    The Hydro energetic Inventory Study in Chapecozinho River Basin, Brazil is described, comparing the proposed results in 1979 with the actual review in 1989. An analysis for solution the socio-economic and environment problems is also presented. (author)

  4. Dynamic Model for Hydro-Turbine Generator Units Based on a Database Method for Guide Bearings

    Directory of Open Access Journals (Sweden)

    Yong Xu

    2013-01-01

    Full Text Available A suitable dynamic model of rotor system is of great significance not only for supplying knowledge of the fault mechanism, but also for assisting in machine health monitoring research. Many techniques have been developed for properly modeling the radial vibration of large hydro-turbine generator units. However, an applicable dynamic model has not yet been reported in literature due to the complexity of the boundary conditions and exciting forces. In this paper, a finite element (FE rotor dynamic model of radial vibration taking account of operating conditions is proposed. A brief and practical database method is employed to model the guide bearing. Taking advantage of the method, rotating speed and bearing clearance can be considered in the model. A novel algorithm, which can take account of both transient and steady-state analysis, is proposed to solve the model. Dynamic response for rotor model of 125 MW hydro-turbine generator units in Gezhouba Power Station is simulated. Field data from Optimal Maintenance Information System for Hydro power plants (HOMIS are analyzed compared with the simulation. Results illustrate the application value of the model in providing knowledge of the fault mechanism and in failure diagnosis.

  5. Sizing of a wind-hydro system using a reversible hydraulic facility with seawater. A case study in the Canary Islands

    International Nuclear Information System (INIS)

    Portero, Ulises; Velázquez, Sergio; Carta, José A.

    2015-01-01

    Highlights: • A model of a wind-hydro system is developed associated to a specific demand. • A particular case on islands with a weak electrical system is simulated. • A reversible seawater-based pumped-hydro system associated to a wind farm is sized. • The economic benefit of the resulting wind-hydro system is calculated. - Abstract: While the climatic conditions of the Canary Islands (Spain) are highly favourable for wind and solar energy exploitation, the low freshwater reserves are a problem when considering the implementation of hydro-based systems. For this reason, the pumped hydro storage (PHS) systems that have been proposed on the islands and which aim to exploit the available freshwater include an additional seawater desalination process. Given this drawback, this paper proposes an original alternative: a reversible PHS facility which directly uses seawater with the system in this case located on the coast of Gran Canaria island. This facility would be used to manage and better integrate the energy generated by a wind farm into a weak insular electrical system. An analysis is also undertaken of the economic benefits the proposed wind-hydro system would entail for the island’s electrical system. As a result of the incorporation of the hydraulic unit, the contribution of the wind-hydro system in satisfying electricity demand is 29% higher than if a wind-only system is used. The electrical energy generation cost of the wind-hydro system amounts to 95.34 €/MW h, entailing an annual saving for the electrical system of 7.68 M€/year.

  6. Intercomparison of Streamflow Simulations between WRF-Hydro and Hydrology Laboratory-Research Distributed Hydrologic Model Frameworks

    Science.gov (United States)

    KIM, J.; Smith, M. B.; Koren, V.; Salas, F.; Cui, Z.; Johnson, D.

    2017-12-01

    The National Oceanic and Atmospheric Administration (NOAA)-National Weather Service (NWS) developed the Hydrology Laboratory-Research Distributed Hydrologic Model (HL-RDHM) framework as an initial step towards spatially distributed modeling at River Forecast Centers (RFCs). Recently, the NOAA/NWS worked with the National Center for Atmospheric Research (NCAR) to implement the National Water Model (NWM) for nationally-consistent water resources prediction. The NWM is based on the WRF-Hydro framework and is run at a 1km spatial resolution and 1-hour time step over the contiguous United States (CONUS) and contributing areas in Canada and Mexico. In this study, we compare streamflow simulations from HL-RDHM and WRF-Hydro to observations from 279 USGS stations. For streamflow simulations, HL-RDHM is run on 4km grids with the temporal resolution of 1 hour for a 5-year period (Water Years 2008-2012), using a priori parameters provided by NOAA-NWS. The WRF-Hydro streamflow simulations for the same time period are extracted from NCAR's 23 retrospective run of the NWM (version 1.0) over CONUS based on 1km grids. We choose 279 USGS stations which are relatively less affected by dams or reservoirs, in the domains of six different RFCs. We use the daily average values of simulations and observations for the convenience of comparison. The main purpose of this research is to evaluate how HL-RDHM and WRF-Hydro perform at USGS gauge stations. We compare daily time-series of observations and both simulations, and calculate the error values using a variety of error functions. Using these plots and error values, we evaluate the performances of HL-RDHM and WRF-Hydro models. Our results show a mix of model performance across geographic regions.

  7. Locked on course: Hydro-Quebec's commitment to mega-projects

    International Nuclear Information System (INIS)

    Maxwell, J.; Briscoe, F.; Suzuki, Tatsujiro; Lee, J.; Stewart, A.

    1997-01-01

    Large organizations often escalate their commitments to mega-project development, even after evidence becomes available of adverse environmental consequences or lack of economic feasibility. This escalation of commitment transcends both sectorial and national boundaries. Preeminent examples include controversial nuclear projects in the US, hydroelectric projects like the Three Gorges Dam in China, and transport projects like the Chunnel and the Concorde. In this article, the authors examine the experience of Hydro-Quebec with the Great Whale Project. They argue that Hydro-Quebec escalated its commitment even after serious questions emerged about its environmental impacts and economic feasibility, because of (1) its earlier success with large projects, (2) its engineering culture''s norms for consistency, and (3) its role in the government''s desire for economic and cultural autonomy. Finally, they discuss the changes that are necessary to break commitments to such projects

  8. Numerical modeling for hydro-mechanical coupled problems in the context of geo-materials

    International Nuclear Information System (INIS)

    Fernandes, R.

    2009-01-01

    The main technical purpose of this PhD Thesis is to build up and validate a regularisation method, able to remedy to the spurious mesh dependency of post localized computations, in order to make possible hydro-mechanical coupling studies for geo-materials. The proposed model is based on the framework of second gradient models and is called the micro-dilation model. It allows to predict robustly the hydro-mechanical coupled behaviors related to the degradation of natural soils and rocks. This modeling is a clear enhancement with respect to classical second gradient computations since it requires less degrees of freedom and consequently is less time consuming. Its efficiency is shown through hydro-mechanical coupled simulations of underground excavations. Finally, an algorithm to detect several solutions in the direction of singular modes associated with negative eigenvalues is presented. It allows us to deal with the non-linear nature of the irreversible behavior of soils and rocks. The scope of this bifurcation analysis is restricted to symmetrical operators. Through the simulations of homogeneous biaxial tests and underground excavations under drained conditions, it is shown that this algorithm is an efficient and robust tool not only to detect several solutions but also to overcome numerical instabilities near singular points or due to snap-back. (author)

  9. Hydro investment analysis under new market conditions

    Energy Technology Data Exchange (ETDEWEB)

    Doorman, Gerard

    2010-07-01

    of new capacity. Several approaches will be considered and evaluated, among these: Development of EOPS-ST. This model combines long term stochastic optimization with a more detailed short term model that uses linear programming; Development of ProdRisk, which is based on Stochastic Dual Dynamic Programming (SDDP) that allows for more detailed modelling than the traditional SDP approach; A new method using simulator based hydro scheduling models, where first stage decisions are based on deterministic equivalents. A model of this type has been tested for the hydro thermal market problem with good results, but so far without the necessary level of detail. As a first step these approaches will be compared with respect to their potential to solve the actual tasks. The next step will be to implement necessary extensions in the most promising model. In the final phase, the enhanced model will be used for relevant analyses like capacity increases in existing plants, pumped storage, the effect of constraints etc. The presentation will include relevant examples of the impact of higher daily price variations on the operation of the Sira Kvina system. (Author)

  10. Development and assessment of a distribution network of hydro-methane, methanol, oxygen and carbon dioxide in Paraguay

    International Nuclear Information System (INIS)

    Rivarolo, M.; Marmi, S.; Riveros-Godoy, G.; Magistri, L.

    2014-01-01

    Highlights: • We investigate different transporting modes of hydro-methane, methanol, CO 2 and O 2 . • We determine the best transportation technology from an economic point of view. • The best pathway to distribute the hydro-methane depends on quantity and distance. • Methanol distribution presents the lowest cost delivery. - Abstract: This paper summarizes key results of the analysis of different transport modes of hydro-methane, methanol, carbon dioxide and oxygen in Paraguay, Brazil and Argentina. Hydro-methane is produced in Paraguay and can be used to fuel natural gas vehicles, substituting gasoline and diesel which are at the moment imported from foreign countries. Methanol, also produced in Paraguay, is delivered to Brazil, which is one of the Countries with the highest demand in the region. Oxygen can be sold to Argentina for medical and industrial use. Carbon dioxide is delivered throughout Paraguay. The aim of this study is to determine the best transportation technology from an economic and strategic point of view, minimizing costs associated to products distribution. Several scenarios are investigated; each scenario is associated with different delivery modes. A model is developed to estimate both capital and variable costs for different transportation technologies (pipeline, trucks, ships) in order to choose the lowest-cost delivery mode for each product, depending on distances and flow rates. Four different analysis are performed for each scenario, varying the number of vehicles which must be fueled by hydro-methane and considering its influence on the results. The methodology presented here has a general value, thus it can be easily employed for the economic analysis of different fuels and distribution networks, also placed in different scenarios

  11. Small hydro: Policy and potential in Spain

    International Nuclear Information System (INIS)

    Gutierrez, C.

    2001-01-01

    In Spain, the benefits of small-scale (less than 10 MW) hydro are apparently rarely appreciated and there is little support from European institutions. The article suggests that small hydro technology can make a significant contribution to the country's energy requirements and create employment, provided certain obstacles can be removed. Data on the number of small hydros in Spain, and of recent installations are given; the share of hydro in Spain's total energy production is 2.5%. The low environmental impact of hydro is extolled, and the conclusions of a recent study of 'environmental impacts of the production of electricity' are listed. There are said to be unreasonable administrative obstacles; for example, it is more difficult to obtain permission to refurbish a 100 kW hydro plant in Castilla y Leon than it is to install a 30,000 kW gas plant. Some details relating to the affect of hydro on aquatic ecosystems, noise levels, and water quality, are given

  12. Modeling invasive alien plant species in river systems: Interaction with native ecosystem engineers and effects on hydro-morphodynamic processes

    Science.gov (United States)

    van Oorschot, M.; Kleinhans, M. G.; Geerling, G. W.; Egger, G.; Leuven, R. S. E. W.; Middelkoop, H.

    2017-08-01

    Invasive alien plant species negatively impact native plant communities by out-competing species or changing abiotic and biotic conditions in their introduced range. River systems are especially vulnerable to biological invasions, because waterways can function as invasion corridors. Understanding interactions of invasive and native species and their combined effects on river dynamics is essential for developing cost-effective management strategies. However, numerical models for simulating long-term effects of these processes are lacking. This paper investigates how an invasive alien plant species affects native riparian vegetation and hydro-morphodynamics. A morphodynamic model has been coupled to a dynamic vegetation model that predicts establishment, growth and mortality of riparian trees. We introduced an invasive alien species with life-history traits based on Japanese Knotweed (Fallopia japonica), and investigated effects of low- and high propagule pressure on invasion speed, native vegetation and hydro-morphodynamic processes. Results show that high propagule pressure leads to a decline in native species cover due to competition and the creation of unfavorable native colonization sites. With low propagule pressure the invader facilitates native seedling survival by creating favorable hydro-morphodynamic conditions at colonization sites. With high invader abundance, water levels are raised and sediment transport is reduced during the growing season. In winter, when the above-ground invader biomass is gone, results are reversed and the floodplain is more prone to erosion. Invasion effects thus depend on seasonal above- and below ground dynamic vegetation properties and persistence of the invader, on the characteristics of native species it replaces, and the combined interactions with hydro-morphodynamics.

  13. Comparison of simulated and measured response of load rejection on A hydro power plant model with mixed mode nonlinear controller

    Energy Technology Data Exchange (ETDEWEB)

    Babunski, Darko; Tuneski, Atanasko; Zaev, Emil [Faculty of Mechanical Engineering, ' Ss. Cyril and Methodius' University, Skopje (Macedonia, The Former Yugoslav Republic of)

    2014-07-01

    Revised Hydro Power Plant model of the IEEE working group recommended converted to state space model is used for simulation of transient response of hydro turbine, and verification was made using measurements of transients from real Hydro Power Plant (HPP). Nonlinear mixed model controller was designed and implemented into complete HPP simulation model and compared with PID with real parameters used in HPP, and with adjusted PID parameters with consideration of smallest frequency error. Verification of performance of the model was made comparing model response with measured load rejection, which is worst case of HPP operation. (Author)

  14. Long-term stability of the near-field about high-level radioactive waste repository in thermo-hydro-mechanical coupling action condition

    International Nuclear Information System (INIS)

    Liu Yuemiao; Wang Ju; Ke Dan; Cai Meifeng

    2008-01-01

    It is a long-term process for the high-level radioactive waste repository, from opening, construction to end of its service. The long-term stability of the near-field is the key issue for the design of HLW repository because the opening and heat generated from the HLW. Through a nationwide investigation, Beishan area, a Gobi desert in Gansu province, is considered as a suitable candidate and GMZ bentonite deposit which located in Xinghe County, Inner Mongolia has been proposed for the supplier of buffer/backfill material for HLW geological repository in China. According to the R and D guide of high-level radioactive waste disposal in China, the 3D model of HLW repository with high-level radioactive waste, canister and buffer/backfill material is established using FLAC3D. To take into account in situ stress, geothermal gradient, groundwater, thermal relief of HLW and swelling pressure of buffer/backfill material, the evolution of temperature, stress and displacement of HLW repository under thermo-mechanical coupling, hydro-mechanical coupling and thermo-hydro-mechanical coupling conditions was analyzed respectively. The long-term stability of HLW repository in Beishan area was studied. (authors)

  15. Two-scale modelling for hydro-mechanical damage

    International Nuclear Information System (INIS)

    Frey, J.; Chambon, R.; Dascalu, C.

    2010-01-01

    Document available in extended abstract form only. Excavation works for underground storage create a damage zone for the rock nearby and affect its hydraulics properties. This degradation, already observed by laboratory tests, can create a leading path for fluids. The micro fracture phenomenon, which occur at a smaller scale and affect the rock permeability, must be fully understood to minimize the transfer process. Many methods can be used in order to take into account the microstructure of heterogeneous materials. Among them a method has been developed recently. Instead of using a constitutive equation obtained by phenomenological considerations or by some homogenization techniques, the representative elementary volume (R.E.V.) is modelled as a structure and the links between a prescribed kinematics and the corresponding dual forces are deduced numerically. This yields the so called Finite Element square method (FE2). In a numerical point of view, a finite element model is used at the macroscopic level, and for each Gauss point, computations on the microstructure gives the usual results of a constitutive law. This numerical approach is now classical in order to properly model some materials such as composites and the efficiency of such numerical homogenization process has been shown, and allows numerical modelling of deformation processes associated with various micro-structural changes. The aim of this work is to describe trough such a method, damage of the rock with a two scale hydro-mechanical model. The rock damage at the macroscopic scale is directly link with an analysis on the microstructure. At the macroscopic scale a two phase's problem is studied. A solid skeleton is filled up by a filtrating fluid. It is necessary to enforce two balance equation and two mass conservation equations. A classical way to deal with such a problem is to work with the balance equation of the whole mixture, and the mass fluid conservation written in a weak form, the mass

  16. Good prospects for Portuguese small hydro industry

    International Nuclear Information System (INIS)

    Betamio de Almeida, A.; Serranho, H.

    2000-01-01

    The article outlines the history of hydro in Portugal and discusses the current position of small-scale hydro with particular reference to the Portuguese Small Hydro Association (AMPH). Encouraged by legislation, and the Valoren community programme (which defined investment incentives), many new small hydro projects sprang up in Portugal in the 1990s. In some areas of Portugal the water levels were higher than the urban centres where the water is required: how the problems of integrating power and water were addressed is described. The integration of power and irrigation schemes is also mentioned. In the wake of great expansion in the Portuguese hydro industry, there was a sharp reduction (in 1995-6) and the reasons for that are listed. The 1999 tariff was such that it is likely that small hydro will provide 3.8% of the electric power consumed nationally by 2010

  17. Hydro-Economic based Model of Damage and Loss Analysis of Winongo River Flood

    Directory of Open Access Journals (Sweden)

    Muhammad Rifki Hardika

    2017-09-01

    Full Text Available Winongo River experienced considerably high flow that caused overflows along the downstream part of the river and some inundation at the surrounding area. The inundation has reached up to 1 m spread over the Tegalrejo Sub-district of Yogyakarta City and swept two houses. This paper analyses the damage and loss due to the flood by taking into account the hydraulics phenomena and the economic impact at the inundation area. A hydraulics model has been developed to study the flow characteristics during the flood of Winongo River, especially in the river reach in Tegalrejo Sub-district. The hazard-induced damages in the flooded area were identified and the economic impacts were studied. Several related software have been utilized to analyse the damage and loss of the disaster, including the HEC-RAS 5.0, ArcGIS, HEC-GeoRAS and InaSAFE. Through the integration of the characteristics of both flood phenomena and the economic factor, the damage and loss were then analysed and the Average Annual Damage (AAD of approximately IDR 88,750,000,000 was obtained.

  18. Micro-hydro power: reviewing an old concept

    Energy Technology Data Exchange (ETDEWEB)

    Alward, R.; Eisenbart, S.; Volkman, J.

    1979-01-01

    This informaion package has been prepared to respond to an increasing number of requests for information on micro-hydro systems. It contains a resource directory, which is an attempt to put the reader in contact with the literature, plans, people, and companies appropriate to needs. On a world-wide basis, small-scale, environmentally benign, mechanical, and electrical hydropower systems are common. These are the systems for individual homes, farm, and shop use and generally have power outputs less than 100 kW. For convenience in terminology, this scale of hydro power is referred to as micro-hydro. A decision tree is first presented followed by information on determining the suitability of th site, equipment, economics, sources for financial assistance, regulatory conflicts, cautions and suggestions for the Do-It-Yourselfer, and the Self-Installer, manufacturers and suppliers, and sources of professional services. An annotated bibliography of 16 references is provided. (MCW)

  19. Innovative private micro-hydro power development in Rwanda

    International Nuclear Information System (INIS)

    Pigaht, Maurice; Plas, Robert J. van der

    2009-01-01

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (i) institutional arrangements rather than technical quality determine the success of such projects; (ii) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (iii) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too.

  20. Modeling the effect of urban infrastructure on hydrologic processes within i-Tree Hydro, a statistically and spatially distributed model

    Science.gov (United States)

    Taggart, T. P.; Endreny, T. A.; Nowak, D.

    2014-12-01

    Gray and green infrastructure in urban environments alters many natural hydrologic processes, creating an urban water balance unique to the developed environment. A common way to assess the consequences of impervious cover and grey infrastructure is by measuring runoff hydrographs. This focus on the watershed outlet masks the spatial variation of hydrologic process alterations across the urban environment in response to localized landscape characteristics. We attempt to represent this spatial variation in the urban environment using the statistically and spatially distributed i-Tree Hydro model, a scoping level urban forest effects water balance model. i-Tree Hydro has undergone expansion and modification to include the effect of green infrastructure processes, road network attributes, and urban pipe system leakages. These additions to the model are intended to increase the understanding of the altered urban hydrologic cycle by examining the effects of the location of these structures on the water balance. Specifically, the effect of these additional structures and functions on the spatially varying properties of interception, soil moisture and runoff generation. Differences in predicted properties and optimized parameter sets between the two models are examined and related to the recent landscape modifications. Datasets used in this study consist of watersheds and sewersheds within the Syracuse, NY metropolitan area, an urban area that has integrated green and gray infrastructure practices to alleviate stormwater problems.

  1. Stochastic modeling of economic injury levels with respect to yearly trends in price commodity.

    Science.gov (United States)

    Damos, Petros

    2014-05-01

    The economic injury level (EIL) concept integrates economics and biology and uses chemical applications in crop protection only when economic loss by pests is anticipated. The EIL is defined by five primary variables: the cost of management tactic per production unit, the price of commodity, the injury units per pest, the damage per unit injury, and the proportionate reduction of injury averted by the application of a tactic. The above variables are related according to the formula EIL = C/VIDK. The observable dynamic alteration of the EIL due to its different parameters is a major characteristic of its concept. In this study, the yearly effect of the economic variables is assessed, and in particular the influence of the parameter commodity value on the shape of the EIL function. In addition, to predict the effects of the economic variables on the EIL level, yearly commodity values were incorporated in the EIL formula and the generated outcomes were further modelled with stochastic linear autoregressive models having different orders. According to the AR(1) model, forecasts for the five-year period of 2010-2015 ranged from 2.33 to 2.41 specimens per sampling unit. These values represent a threshold that is in reasonable limits to justify future control actions. Management actions as related to productivity and price commodity significantly affect costs of crop production and thus define the adoption of IPM and sustainable crop production systems at local and international levels. This is an open access paper. We use the Creative Commons Attribution 3.0 license that permits unrestricted use, provided that the paper is properly attributed.

  2. Experience of pico/micro hydro based power generation

    Energy Technology Data Exchange (ETDEWEB)

    Murthy, S.S. [Indian Inst. of Technology, Delhi, New Delhi (India). Dept. of Electrical Engineering

    2010-07-01

    Although India has approximately 150,000 megawatts of hydro potential, only a small portion is tapped. There is also significant untapped hydro potential in many developing countries such as Nepal, Bhutan, Vietnam, Indonesia and regions in South America and Africa. Small-scale hydroelectric power systems with capacities of up to a few megawatts are eco-friendly and sustainable. They can be classified based on unit sizes as pico (u pto 10 kilowatts), micro (10-100 kilowatts) and mini (100 kilowatts to a few megawatts) hydro systems. Mini hydro systems are always grid connected while micro can be either grid connected or off grid. Pico is always off grid. In India, there are thousands of favorable sites in this range that should be tapped for distributed power generation to electrify local communities. This need is reflected by the global emphasis on distributed power generation as well as the Government of India's policy to promote this type of power generation. A working stand alone pico-hydro power generating system has been successfully installed in 5 sites in Karnataka. The purpose of the project was to demonstrate the technical, managerial and economic feasibility of setting up small hydro projects in remote hilly areas of Karnataka, India and its positive environmental impact. The presentation discussed the site selection criteria; installed sites of pico hydro; system description; parts of the system; the electric load controller; types of electronic load controllers; and a description of the unit and control scheme. tabs., figs.

  3. Toronto Hydro annual report, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Toronto Hydro is the electric utility serving about 219,000 customers in Toronto, Ontario. In 1992, the utility purchased 9.6 billion kWh of electricity from Ontario Hydro, down 3.6% from 1990. Energy sales totalled 9.2 billion kWh, down 4.1% from 1990. Retail electricity rates increased an average of 6.7% in 1992, in spite of an increase in Ontario Hydro's wholesale rate by 8.2%, due to better than anticipated financial results and cost-control measures. The decline in electricity purchases and sales are attributed to economic factors, which also contributed to an increase in the utility's provision for bad debts. The third year of a 13.8-kV conversion project was completed in 1992; this project is converting the existing 4 kV distribution system to the higher voltage since maintenance and repair of the existing system is costly and the equipment is becoming less reliable. New construction, refurbishing, and modernization of equipment were performed at a number of substations. Other improvements in 1992 are reported in the areas of management and engineering systems, personnel policies, work safety, and energy management. Financial statements are included. 11 figs., 4 tabs

  4. Coupling X-band dual-polarized mini-radars and hydro-meteorological forecast models: the HYDRORAD project

    Directory of Open Access Journals (Sweden)

    E. Picciotti

    2013-05-01

    Full Text Available Hydro-meteorological hazards like convective outbreaks leading to torrential rain and floods are among the most critical environmental issues world-wide. In that context weather radar observations have proven to be very useful in providing information on the spatial distribution of rainfall that can support early warning of floods. However, quantitative precipitation estimation by radar is subjected to many limitations and uncertainties. The use of dual-polarization at high frequency (i.e. X-band has proven particularly useful for mitigating some of the limitation of operational systems, by exploiting the benefit of easiness to transport and deploy and the high spatial and temporal resolution achievable at small antenna sizes. New developments on X-band dual-polarization technology in recent years have received the interest of scientific and operational communities in these systems. New enterprises are focusing on the advancement of cost-efficient mini-radar network technology, based on high-frequency (mainly X-band and low-power weather radar systems for weather monitoring and hydro-meteorological forecasting. Within the above context, the main objective of the HYDRORAD project was the development of an innovative mbox{integrated} decision support tool for weather monitoring and hydro-meteorological applications. The integrated system tool is based on a polarimetric X-band mini-radar network which is the core of the decision support tool, a novel radar products generator and a hydro-meteorological forecast modelling system that ingests mini-radar rainfall products to forecast precipitation and floods. The radar products generator includes algorithms for attenuation correction, hydrometeor classification, a vertical profile reflectivity correction, a new polarimetric rainfall estimators developed for mini-radar observations, and short-term nowcasting of convective cells. The hydro-meteorological modelling system includes the Mesoscale Model 5

  5. System-level modeling for economic evaluation of geological CO2 storage in gas reservoirs

    International Nuclear Information System (INIS)

    Zhang, Yingqi; Oldenburg, Curtis M.; Finsterle, Stefan; Bodvarsson, Gudmundur S.

    2007-01-01

    One way to reduce the effects of anthropogenic greenhouse gases on climate is to inject carbon dioxide (CO 2 ) from industrial sources into deep geological formations such as brine aquifers or depleted oil or gas reservoirs. Research is being conducted to improve understanding of factors affecting particular aspects of geological CO 2 storage (such as storage performance, storage capacity, and health, safety and environmental (HSE) issues) as well as to lower the cost of CO 2 capture and related processes. However, there has been less emphasis to date on system-level analyses of geological CO 2 storage that consider geological, economic, and environmental issues by linking detailed process models to representations of engineering components and associated economic models. The objective of this study is to develop a system-level model for geological CO 2 storage, including CO 2 capture and separation, compression, pipeline transportation to the storage site, and CO 2 injection. Within our system model we are incorporating detailed reservoir simulations of CO 2 injection into a gas reservoir and related enhanced production of methane. Potential leakage and associated environmental impacts are also considered. The platform for the system-level model is GoldSim [GoldSim User's Guide. GoldSim Technology Group; 2006, http://www.goldsim.com]. The application of the system model focuses on evaluating the feasibility of carbon sequestration with enhanced gas recovery (CSEGR) in the Rio Vista region of California. The reservoir simulations are performed using a special module of the TOUGH2 simulator, EOS7C, for multicomponent gas mixtures of methane and CO 2 . Using a system-level modeling approach, the economic benefits of enhanced gas recovery can be directly weighed against the costs and benefits of CO 2 injection

  6. Economic Modelling in Institutional Economic Theory

    Directory of Open Access Journals (Sweden)

    Wadim Strielkowski

    2017-06-01

    Full Text Available Our paper is centered around the formation of theory of institutional modelling that includes principles and ideas reflecting the laws of societal development within the framework of institutional economic theory. We scrutinize and discuss the scientific principles of this institutional modelling that are increasingly postulated by the classics of institutional theory and find their way into the basics of the institutional economics. We propose scientific ideas concerning the new innovative approaches to institutional modelling. These ideas have been devised and developed on the basis of the results of our own original design, as well as on the formalisation and measurements of economic institutions, their functioning and evolution. Moreover, we consider the applied aspects of the institutional theory of modelling and employ them in our research for formalizing our results and maximising the practical outcome of our paper. Our results and findings might be useful for the researchers and stakeholders searching for the systematic and comprehensive description of institutional level modelling, the principles involved in this process and the main provisions of the institutional theory of economic modelling.

  7. Role of Pumped Storage Hydro Resources in Electricity Markets and System Operation: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Ela, E.; Kirby, B.; Botterud, A.; Milostan, C.; Krad, I.; Koritarov, V.

    2013-05-01

    The most common form of utility- sized energy storage system is the pumped storage hydro system. Originally, these types of storage systems were economically viable simply because they displace more expensive generating units. However, over time, as those expensive units became more efficient and costs declined, pumped hydro storage units no longer have the operational edge. As a result, in the current electricity market environment, pumped storage hydro plants are struggling. To offset this phenomenon, certain market modifications should be addressed. This paper will introduce some of the challenges faced by pumped storage hydro plants in today's markets and purpose some solutions to those problems.

  8. Innovative private micro-hydro power development in Rwanda

    Energy Technology Data Exchange (ETDEWEB)

    Pigaht, Maurice; Van der Plas, Robert J. [MARGE-Netherlands, Brem 68, 7577 EW Oldenzaal (Netherlands)

    2009-11-15

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (1) institutional arrangements rather than technical quality determine the success of such projects; (2) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (3) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too. (author)

  9. Studying the cumulative environmental effects of Hydro-Quebec's installations plan

    International Nuclear Information System (INIS)

    Dubeau, D.

    1992-01-01

    The study of the cumulative environmental effects that have been integrated with technical and economic analyses include mercury, land use in the region (territory), natural landscapes, cultural heritages, forest dynamics, regional economies and ways of life. Requests and petitions from the public about Hydro-Quebec projects fall into four categories: welfare of communities, impact on the land, environmental responsibility and preservation of plant and animal species. The cooperation of all concerned is necessary for Hydro-Quebec's developments. (author)

  10. An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost

    International Nuclear Information System (INIS)

    Yuan, Xiaohui; Tian, Hao; Yuan, Yanbin; Huang, Yuehua; Ikram, Rana M.

    2015-01-01

    Highlights: • Multi-objective hydro-thermal-wind scheduling model (MO-HTWS) is establish. • The extra cost in MO-HTWS problem caused by wind uncertainty is considered. • An extended NSGA-III is proposed to solve MO-HTWS problem. • Constraint handling strategies are presented to modify infeasible solutions. • The feasibility and effectiveness of the proposed method is verified by example. - Abstract: Due to the characteristics of clean and renewable, wind power is significant to economic and environmental operation of electric power system so that it attracts more and more attention from researchers. This paper integrates wind power with hydrothermal scheduling to establish multi-objective economic emission hydro-thermal-wind scheduling problem (MO-HTWS) model with considering wind uncertain cost. To solve MO-HTWS problem with various complicated constraints, this paper extends NSGA-III by introducing the dominance relationship criterion based on constraint violation to select new generation. Moreover, the constraint handling strategy which repairs the infeasible solutions by modifying the decision variables in feasible zone according to the violation amount is proposed. Finally, a daily scheduling example of hydro-thermal-wind system is used to test the ability of NSGA-III for solving MO-HTWS problem. It is concluded from the superior quality and good distribution of the Pareto optimal solutions that, NSGA-III can offer an efficient alternative for optimizing MO-HTWS problem

  11. On the use of effective stress in three-dimensional hydro-mechanical coupled model

    International Nuclear Information System (INIS)

    Arairo, W.; Prunier, F.; Djeran-Maigre, I.; Millard, A.

    2014-01-01

    In the last decades, a number of hydro-mechanical elastoplastic constitutive models for unsaturated soils have been proposed. Those models couple the hydraulic and mechanical behaviour of unsaturated soils, and take into account the effects of the degree of saturation on the stress-strain behaviour and the effects of deformation on the soil-water characteristic response with a simple reversible part for the hysteresis. In addition, the influence of the suction on the stress-strain behaviour is considered. However, until now, few models predict the stress-strain and soil-water characteristic responses of unsaturated soils in a fully three-dimensional Finite Element code. This paper presents the predictions of an unsaturated soil model in a Three-dimensional Framework, and develops a study on the effect of partial saturation on the stability of shallow foundation resting on unsaturated silty soil. Qualitative predictions of the constitutive model show that incorporating a special formulation for the effective stress into an elastoplastic coupled hydro-mechanical model opens a full range of possibilities in modelling unsaturated soil behaviour. (authors)

  12. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  13. The HydroShare Collaborative Repository for the Hydrology Community

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of, and collaboration around, "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting our approach to making this system easy to use and serving the needs of the hydrology community represented by the Consortium of Universities for the Advancement of Hydrologic Sciences, Inc. (CUAHSI). Metadata for uploaded files is harvested automatically or captured using easy to use web user interfaces. Users are encouraged to add or create resources in HydroShare early in the data life cycle. To encourage this we allow users to share and collaborate on HydroShare resources privately among individual users or groups, entering metadata while doing the work. HydroShare also provides enhanced functionality for users through web apps that provide tools and computational capability for actions on resources. HydroShare's architecture broadly is comprised of: (1) resource storage, (2) resource exploration website, and (3) web apps for actions on resources. System components are loosely coupled and interact through APIs, which enhances robustness, as components can be upgraded and advanced relatively independently. The full power of this paradigm is the

  14. Current issues in the management of low- and intermediate-level radioactive wastes from Ontario Hydro's CANDU reactors

    International Nuclear Information System (INIS)

    Krasznai, J.P.; Vaughan, B.R.; Williamson, A.S.

    1990-01-01

    Nuclear generating stations (NGSs) in Canada are operated by utilities in Ontario, Quebec, and New Brunswick. Ontario Hydro, with a committed nuclear program of 13,600 MW(electric) is the major producer of CANDU pressurized heavy-water reactor (PHWR) low- and intermediate-level radioactive wastes. All radioactive wastes with the exception of irradiated fuel are processed and retrievably stored at a centralized facility at the Bruce Nuclear Power Development site. Solid-waste classifications and annual production levels are given. Solid-waste management practices at the site as well as the physical, chemical, and radiochemical characteristics of the wastes are well documented. The paper summarizes types, current inventory, and estimated annual production rate of liquid waste. Operation of the tritium recovery facility at Darlington NGS, which removes tritium from heavy water and produces tritium gas in the process, gives rise to secondary streams of tritiated solid and liquid wastes, which will receive special treatment and packaging. In addition to the treatment of radioactive liquid wastes, there are a number of other important issues in low- and intermediate-level radioactive waste management that Ontario Hydro will be addressing over the next few years. The most pressing of these is the reduction of radioactive wastes through in-station material control, employee awareness, and improved waste characterization and segregation programs. Since Ontario Hydro intends to store retrievable wastes for > 50 yr, it is necessary to determine the behavior of wastes under long-term storage conditions

  15. Thermo-hydro mechanical modeling in unsaturated hard clay: application to nuclear waste storage

    International Nuclear Information System (INIS)

    Jia, Y.

    2006-07-01

    This work presents an elastoplastic damage model for argillite in unsaturated conditions. A short resume of experimental investigations is presented in the first part. The results obtained show an important plastic deformation coupled with damage induced by initiation and growth of microcracks. Influences of water content on the mechanical behaviour are also investigated. Based on experimental data and micro-mechanical considerations, a general constitutive model is proposed for the poro-mechanical behavior of argillite in unsaturated conditions. The time dependent creep has also been incorporated in they model. The performance of the model is examined by comparing numerical simulation with experimental data in various load paths under saturated and unsaturated conditions. Finally, the model is applied to hydro-mechanical coupling study of the REP experiment and thermo-hydro-mechanical coupling study of the HE-D experiment. A good agreement is obtained between experimental data and numerical predictions. It has been shown that the proposed model describe correctly the main features of the mechanical behaviour of unsaturated rocks. (author)

  16. Data and Models as Social Objects in the HydroShare System for Collaboration in the Hydrology Community and Beyond

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Band, L. E.; Merwade, V.; Couch, A.; Hooper, R. P.; Maidment, D. R.; Dash, P. K.; Stealey, M.; Yi, H.; Gan, T.; Castronova, A. M.; Miles, B.; Li, Z.; Morsy, M. M.; Crawley, S.; Ramirez, M.; Sadler, J.; Xue, Z.; Bandaragoda, C.

    2016-12-01

    How do you share and publish hydrologic data and models for a large collaborative project? HydroShare is a new, web-based system for sharing hydrologic data and models with specific functionality aimed at making collaboration easier. HydroShare has been developed with U.S. National Science Foundation support under the auspices of the Consortium of Universities for the Advancement of Hydrologic Science, Inc. (CUAHSI) to support the collaboration and community cyberinfrastructure needs of the hydrology research community. Within HydroShare, we have developed new functionality for creating datasets, describing them with metadata, and sharing them with collaborators. We cast hydrologic datasets and models as "social objects" that can be shared, collaborated around, annotated, published and discovered. In addition to data and model sharing, HydroShare supports web application programs (apps) that can act on data stored in HydroShare, just as software programs on your PC act on your data locally. This can free you from some of the limitations of local computing capacity and challenges in installing and maintaining software on your own PC. HydroShare's web-based cyberinfrastructure can take work off your desk or laptop computer and onto infrastructure or "cloud" based data and processing servers. This presentation will describe HydroShare's collaboration functionality that enables both public and private sharing with individual users and collaborative user groups, and makes it easier for collaborators to iterate on shared datasets and models, creating multiple versions along the way, and publishing them with a permanent landing page, metadata description, and citable Digital Object Identifier (DOI) when the work is complete. This presentation will also describe the web app architecture that supports interoperability with third party servers functioning as application engines for analysis and processing of big hydrologic datasets. While developed to support the

  17. The political economy of Canadian hydro-electricity : between old provincial hydros and neoliberal regional energy regimes

    International Nuclear Information System (INIS)

    Netherton, A.

    2007-01-01

    In economic terms, hydro-electricity is considered as a quasi-staple, as it prone to the classic staples problem of excess capacity. However, neither water nor hydroelectricity in Canada is produced primarily for export markets. Hydroelectric systems are often thought of as politicized monopolies. This paper discussed changes that have occurred in hydroelectric organizations over time, as they have been governed by a formative mixed regime; postwar provincial hydro systems; a megaprojects regime; and an emerging sustainability regionalization regime. The origins of electricity generation and transmission in Canada were discussed, as well as the ecological footprint of large mega-projects on rivers. The development of provincial hydro monopolies during the mid- to late- twentieth century was also outlined, as well as the sustainability and regionalization regime that developed after 1990. During the mature staples period of the mid-century, rents in hydro-electric organizations were distributed through cheap rates to subsidize and facilitate the development of mass production and mass consumption. However, post-staples consumption has now replaced mass consumption, and demand side management is replacing earlier cheap power policies. Nonetheless, the lack of systematic integration of networks has led to inefficiencies. Provincial grids are now being integrated into interconnected North American regional networks regulated by the United States. It was concluded that the Canadian electricity regime is increasingly influenced by the the supranational role that the United States is playing in structuring markets. 83 refs

  18. Modelling the hydro-mechanical behaviour of swelling unsaturated soils; Modelisation du comportement hydromecanique des sols gonflants non satures

    Energy Technology Data Exchange (ETDEWEB)

    Mrad, M

    2005-10-15

    The use of compacted swelling soils in engineering practice is very widely spread, especially in geotechnical and environmental engineering. After their setup, these materials are likely to be subject to complex suction/stress paths involving significant variations of their hydro-mechanical properties which can affect their initial behaviour. It is important to be able to predict the hydro-mechanical behaviour of these materials taking into account the significant applications for which they are intended. Barcelona team developed a finite-element code (Code-Bright) for the thermo-hydro-mechanical coupling (THM) integrating the BBM elastoplastic model for unsaturated soils based on the independent variables approach. This model is recognized to correctly describe the hydro-mechanical behaviour of unsaturated soils but fails to take into account some particular observed aspects on swelling soils. A second model BExM was then proposed to address these aspects. The objective of this study is: (i) to implement the elastoplastic model BExM for the unsaturated swelling soils in the finite-element code (Code-Bright); (ii) to check the numerical model validity through the numerical simulation of laboratory tests made on swelling soils; and (iii) to apply this model to some practical problems. For this purpose, a new family of numerical procedures adapted to the BExM model was introduced into the code. The equation of the yield surface of this model for a given deviatoric stress states was given in a manner to facilitate calculations of its derivatives. The model was checked by the numerical simulation of suction-controlled odometric tests made on three different swelling soils. The simulation results showed that the numerical model is able to correctly reproduce the experimental data. Lastly, the model was applied to two practical problems: radioactive waste repository in deep geological layers and a shallow footing under the action of a swelling soil. The results obtained

  19. Fuzzy logic approach for energetic and economic evaluation of hydroelectric projects

    International Nuclear Information System (INIS)

    Iliev, Atanas M.

    2003-01-01

    A mathematical model for energetic and economic evaluation of hydroelectric projects is developed. The main advantage of the proposed methodology is that the model considers uncertainty and vagueness which appears during the decision making process. Due to modeling of variables that are non statistical in their character, fuzzy logic approach is fully incorporated in the model. The first step in energetic evaluation of the hydro power projects is determination of the characteristic of the efficiency of the units to be installed in hydro power plants. For this purpose the model which uses the best characteristics of Artificial Network Fuzzy Inference System (ANFIS) is applied. The method is tested on real systems: HPP Tikves- the power plant in operation and HPP Kozjak - the power plant in construction. The results obtained from practical implementation show that the proposed approach gives superior results than classical polynomial approximation. The model for determining the consumption characteristic of hydro power plant is developed by Sugeno Fuzzy Logic System with polynomials in the consequent part of the rules. Model takes into account the variable gross head of HPP, as well as, the number of units which will be in operation for given output. Modeling of the gross head and power output are performed by expert's design membership functions. This model is practically applied on HPP Tikves for determination of the consumption characteristic for several gross head. The plausible yearly production of electricity from hydro power project, which is important for estimation of the benefit from the project, is calculated by mixed fuzzy-statistical model. hi this approach fuzzy set of the inflow is constructed according to the statistical parameters. The calculation of the production of electricity is realized for a several hydrological conditions which are described by linguistic variables. Finally, Mamdani Fuzzy Inference System with fuzzy number in consequent part

  20. Hydro One 2002 annual report

    International Nuclear Information System (INIS)

    2003-01-01

    Financial information from Hydro One was presented and a review of its 2002 operations was made available for the benefit of shareholders. Hydro One is the largest electricity delivery company in Ontario and one of the largest in North America. It began operation in 1999 after Ontario Hydro restructured its delivery and generation entities. Hydro One now includes power transmission, power distribution and telecom, with transmission and distribution operations representing 99 per cent of its business. This report indicates that in 2002, the utility had strong financial performance with $344 million in net income. The utility met its health and safety targets, and established a customer advisory board to improve customer satisfaction. A layer of management at the executive level was eliminated to stream-line decision-making and enhance productivity. The electricity network was upgraded and maintained through $546 million in capital expenditures. Non-core functions were sold to ensure a better focus on the core business of electricity delivery. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Hydro One and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  1. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  2. The Nothuesli small hydro project

    International Nuclear Information System (INIS)

    Balachandran, S.; Jorde, K.

    2008-01-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  3. Hydro-mechanical behaviour of bentonite-based materials used for high-level radioactive waste disposal

    International Nuclear Information System (INIS)

    Wang, Q.

    2012-01-01

    This study deals with the hydro-mechanical behaviour of compacted bentonite-based materials used as sealing materials in high-level radioactive waste repositories. The pure MX80 bentonite, mixtures of MX80/crushed clay-stone and MX80/sand were used in the investigation. An experimental study on the swelling pressure of the bentonite-based materials was first performed. The results evidenced the effects of water chemistry, hydration procedure and duration, pre-existing technological void and experimental methods. Emphasis was put on the relationship between the swelling pressure and the final dry density of bentonite. Afterwards, the water retention test, hydration test and suction controlled oedometer test were conducted on samples with different voids including the technological void and the void inside the soil. By introducing the parameters as bentonite void ratio and water volume ratio, an overall analysis of the effects of voids on the hydro-mechanical response of the compacted material was performed. To get better insight into the seal evolution in case of technological void, the effects of final dry density and hydration time on the microstructure features were also characterized. Then, the hydraulic properties under unsaturated state were investigated by carrying out water retention test and infiltration test as well as the microstructure observation. The results obtained allowed relating the variation of hydraulic conductivity to the microstructure changes. A small scale (1/10) mock up test of the SEALEX in situ experiment was also performed to study the recovery capacity of bentonite-based material with consideration of a technological void. The results were used for interpreting the in-situ observations. With a reduced time scale, it provides useful information for estimating the saturation duration and sealing effectiveness of the field design. Finally, the experimental data obtained in the laboratory on bentonite/sand mixture were interpreted in the

  4. A Possible Universe in Pulsation by Using a Hydro-Dynamical Model for Gravity

    Directory of Open Access Journals (Sweden)

    Corneliu BERBENTE

    2016-12-01

    Full Text Available By using a hydro-dynamical model for gravity previously given by the author, a pulsating universe is possible to describe. This is possible because two hydro-dynamical sources are in attraction both when they are emitting and absorbing fluid. In our model, bodies (matter and energy are interacting via an incompressible fluid made of gravitons (photon-like particles having a wave length of the order of magnitude of the radius of universe. One considers the universe uniform at large scale, the effects of general relativity type being local and negligible at global scale. An “elastic sphere” model for the universe is suggested to describe the possible inversion. The expansion of the universe stops when the “elastic energy” overcomes the kinetic one; this takes place near the point of maximal emission speed of the fluid of gravitons. The differential equation for the universe in expansion is adapted to contraction. Analytical solutions are given.

  5. Integration of non linearities in the economic refining model. Case of the hydro-desulfurization unit; Prise en compte de non-linearites dans la modelisation economique du raffinage. Cas de l`unite d`hydrodesulfuration

    Energy Technology Data Exchange (ETDEWEB)

    Baudouin, C.

    1998-12-08

    In recent years, the modifications in oil products demand and the increased quality requirements of European specifications have driven the oil industry towards more and more complex refining schemes. This situation should become even more pronounced in the future. Under these conditions, a technical analysis of the units operation must be carried out and combined with an economic approach. The research undertaken is divided into two parts. The first part is dedicated to the study of the European refining industry and its representation by the classic linear programming model. In these models, the units` operation is represented by typical running. The technical parameters are not explicitly taken into account. Therefore, in order to meet future requirements and to represent this activity in the best way, the current model must be improved. The second part relates to an analysis with forecasts future developments in the European refining sector up to 2010 and how linear programming models themselves will be adapted. Thus, the straight run gas oil hydro-desulfurization unit is completely redefined. The operating conditions and the design parameters of this unit are introduced into the model. Depending on the feed, they determine the performances and the material balance of the unit. Some of these operating conditions are new variables and appear in non linear equations. Therefore, we need non linear programming (the augmented Lagrangians method) to solve this detailed model. The results of the second part confirm those determined by the first part. They also provide us with a better representation of the hydro-desulfurization unit (taking the optimisation of the operating conditions into account). Using these models and the analysis described above, we can develop an outline plan of the future European refining industry. This shows that sizeable investments in both conventional and deep conversion capacity will be required to meet the requirements of changes in

  6. The Comparison of Point Data Models for the Output of WRF Hydro Model in the IDV

    Science.gov (United States)

    Ho, Y.; Weber, J.

    2017-12-01

    WRF Hydro netCDF output files contain streamflow, flow depth, longitude, latitude, altitude and stream order values for each forecast point. However, the data are not CF compliant. The total number of forecast points for the US CONUS is approximately 2.7 million and it is a big challenge for any visualization and analysis tool. The IDV point cloud display shows point data as a set of points colored by parameter. This display is very efficient compared to a standard point type display for rendering a large number of points. The one problem we have is that the data I/O can be a bottleneck issue when dealing with a large collection of point input files. In this presentation, we will experiment with different point data models and their APIs to access the same WRF Hydro model output. The results will help us construct a CF compliant netCDF point data format for the community.

  7. A long-term analysis of pumped hydro storage to firm wind power

    International Nuclear Information System (INIS)

    Foley, A.M.; Leahy, P.G.; Li, K.; McKeogh, E.J.; Morrison, A.P.

    2015-01-01

    Highlights: • This is a long term generation analysis of a high wind power system. • A high CO 2 and fossil fuel price is closest to Ireland’s EU ETS 2020 target. • New pumped storage to firm wind is limited unless strong market costs exist. • Reserve for wind power show that ancillary services are relevant for balancing. - Abstract: Although pumped hydro storage is seen as a strategic key asset by grid operators, financing it is complicated in new liberalised markets. It could be argued that the optimum generation portfolio is now determined by the economic viability of generators based on a short to medium term return on investment. This has meant that capital intensive projects such as pumped hydro storage are less attractive for wholesale electricity companies because the payback periods are too long. In tandem a significant amount of wind power has entered the generation mix, which has resulted in operating and planning integration issues due to wind’s inherent uncertain, varying spatial and temporal nature. These integration issues can be overcome using fast acting gas peaking plant or energy storage. Most analysis of wind power integration using storage to date has used stochastic optimisation for power system balancing or arbitrage modelling to examine techno-economic viability. In this research a deterministic dynamic programming long term generation expansion model is employed to optimise the generation mix, total system costs and total carbon dioxide emissions, and unlike other studies calculates reserve to firm wind power. The key finding of this study is that the incentive to build capital-intensive pumped hydro storage to firm wind power is limited unless exogenous market costs come very strongly into play. Furthermore it was demonstrated that reserve increases with increasing wind power showing the importance of ancillary services in future power systems

  8. Regional and economic development

    International Nuclear Information System (INIS)

    Fortin, P.

    2004-01-01

    A leading economics expert was asked to list the economic advantages and disadvantages associated with electricity exports. This paper presents his expert opinion and presents a regional and economic analysis of the hydroelectric reserves that Hydro-Quebec should maintain in order to ensure long-term reliability of energy supplies while maintaining its potential for profitable exports. Electricity exports from Hydro-Quebec are extremely profitable for the province. From 1999 to 2003, net cumulative exports of 63 TWh brought in 4.2 billion dollars to the province of Quebec. This income was redistributed to Quebecers in the form of low energy prices. From 1994 to 2003, the average annual electricity export from Hydro-Quebec was 18 TWh which represents 11 per cent of all electricity delivered by the producer. Most of this export was sold to short-term markets. This ensures that electricity remains available to Quebec should the need arise. Long term sales agreement have never dominated the utility, and today account for only 1.5 per cent of electricity production. In order to ensure a secure electricity supply, Hydro-Quebec has kept a safety margin of 10 TWh through its large hydro-reservoirs. However, the year 2003 proved to be a difficult year for the producer due to low precipitation. The safety margin was completely consumed and the utility had to import electricity. A theoretical analysis of the market suggests that Hydro-Quebec's safety margin should be increased from 10 to 20 TWh to better meet energy demands during years of low precipitation. 1 tab., 2 figs

  9. Modelling the economic impact of three lameness causing diseases using herd and cow level evidence

    DEFF Research Database (Denmark)

    Ettema, Jehan Frans; Østergaard, Søren; Kristensen, Anders Ringgaard

    2010-01-01

    Diseases to the cow's hoof, interdigital skin and legs are highly prevalent and of large economic impact in modern dairy farming. In order to support farmer's decisions on preventing and treating lameness and its underlying causes, decision support models can be used to predict the economic...... horn diseases. Secondly, the existing simulation model was set-up inwaythat it uses hyper-distributions describing diseases risk of the three lameness causing diseases. By combining information on herd level risk factors with prevalence of lameness or prevalence of underlying diseases among cows...

  10. Small hydro generation building block profile

    International Nuclear Information System (INIS)

    2003-01-01

    Concise business information on small hydro generation in British Columbia was presented in this document. It was noted that the steep terrain within the province and its abundant precipitation provides numerous opportunities for hydropower generation in British Columbia. The hydroelectric sector produces approximately 90 per cent of the electrical demand in the province. The document focusses on small hydro sites producing between 0.5 and 50 mega watts (MW) and not having large water storage. In the first section, an overview of the electricity sector in the province is provided. The following issues are examined in subsequent sections: land resources; infrastructure requirements; sales market; labour market; the regulatory regime; development factors; non-governmental aspects; investments and economics; the present status and future outlook of the industry; and, government revenue. Input-output tables were also provided. 22 refs., 5 tabs., 4 figs

  11. Nonlinear modeling and dynamic analysis of hydro-turbine governing system in the process of load rejection transient

    International Nuclear Information System (INIS)

    Zhang, Hao; Chen, Diyi; Xu, Beibei; Wang, Feifei

    2015-01-01

    Graphical abstract: Nonlinear dynamic transfer coefficients are introduced to the hydro-turbine governing system. In the process of load reject ion transient, the nonlinear dynamical behaviors of the system are studied in detail. - Highlights: • A novel mathematical model of a hydro-turbine governing system is established. • The process of load rejection transient is considered. • Nonlinear dynamic transfer coefficients are introduced to the system. • The bifurcation diagram with the variable t has better engineering significance. • The nonlinear dynamical behaviors of the system are studied in detail. - Abstract: This article pays attention to the mathematical modeling of a hydro-turbine governing system in the process of load rejection transient. As a pioneer work, the nonlinear dynamic transfer coefficients are introduced in a penstock system. Considering a generator system, a turbine system and a governor system, we present a novel nonlinear dynamical model of a hydro-turbine governing system. Fortunately, for the unchanged of PID parameters, we acquire the stable regions of the governing system in the process of load rejection transient by numerical simulations. Moreover, the nonlinear dynamic behaviors of the governing system are illustrated by bifurcation diagrams, Poincare maps, time waveforms and phase orbits. More importantly, these methods and analytic results will present theoretical groundwork for allowing a hydropower station in the process of load rejection transient

  12. Hydro Power Reservoir Aggregation via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Markus Löschenbrand

    2017-12-01

    Full Text Available Electrical power systems with a high share of hydro power in their generation portfolio tend to display distinct behavior. Low generation cost and the possibility of peak shaving create a high amount of flexibility. However, stochastic influences such as precipitation and external market effects create uncertainty and thus establish a wide range of potential outcomes. Therefore, optimal generation scheduling is a key factor to successful operation of hydro power dominated systems. This paper aims to bridge the gap between scheduling on large-scale (e.g., national and small scale (e.g., a single river basin levels, by applying a multi-objective master/sub-problem framework supported by genetic algorithms. A real-life case study from southern Norway is used to assess the validity of the method and give a proof of concept. The introduced method can be applied to efficiently integrate complex stochastic sub-models into Virtual Power Plants and thus reduce the computational complexity of large-scale models whilst minimizing the loss of information.

  13. Modelling energy production by small hydro power plants in collective irrigation networks of Calabria (Southern Italy)

    Science.gov (United States)

    Zema, Demetrio Antonio; Nicotra, Angelo; Tamburino, Vincenzo; Marcello Zimbone, Santo

    2017-04-01

    The availability of geodetic heads and considerable water flows in collective irrigation networks suggests the possibility of recovery potential energy using small hydro power plants (SHPP) at sustainable costs. This is the case of many Water Users Associations (WUA) in Calabria (Southern Italy), where it could theoretically be possible to recovery electrical energy out of the irrigation season. However, very few Calabrian WUAs have currently built SHPP in their irrigation networks and thus in this region the potential energy is practically fully lost. A previous study (Zema et al., 2016) proposed an original and simple model to site turbines and size their power output as well as to evaluate profits of SHPP in collective irrigation networks. Applying this model at regional scale, this paper estimates the theoretical energy production and the economic performances of SHPP installed in collective irrigation networks of Calabrian WUAs. In more detail, based on digital terrain models processed by GIS and few parameters of the water networks, for each SHPP the model provides: (i) the electrical power output; (iii) the optimal water discharge; (ii) costs, revenues and profits. Moreover, the map of the theoretical energy production by SHPP in collective irrigation networks of Calabria was drawn. The total network length of the 103 water networks surveyed is equal to 414 km and the total geodetic head is 3157 m, of which 63% is lost due to hydraulic losses. Thus, a total power output of 19.4 MW could theoretically be installed. This would provide an annual energy production of 103 GWh, considering SHPPs in operation only out of the irrigation season. The single irrigation networks have a power output in the range 0.7 kW - 6.4 MW. However, the lowest SHPPs (that is, turbines with power output under 5 kW) have been neglected, because the annual profit is very low (on average less than 6%, Zema et al., 2016). On average each irrigation network provides an annual revenue from

  14. A Coupled Thermo-Hydro-Mechanical Model of Jointed Hard Rock for Compressed Air Energy Storage

    Directory of Open Access Journals (Sweden)

    Xiaoying Zhuang

    2014-01-01

    Full Text Available Renewable energy resources such as wind and solar are intermittent, which causes instability when being connected to utility grid of electricity. Compressed air energy storage (CAES provides an economic and technical viable solution to this problem by utilizing subsurface rock cavern to store the electricity generated by renewable energy in the form of compressed air. Though CAES has been used for over three decades, it is only restricted to salt rock or aquifers for air tightness reason. In this paper, the technical feasibility of utilizing hard rock for CAES is investigated by using a coupled thermo-hydro-mechanical (THM modelling of nonisothermal gas flow. Governing equations are derived from the rules of energy balance, mass balance, and static equilibrium. Cyclic volumetric mass source and heat source models are applied to simulate the gas injection and production. Evaluation is carried out for intact rock and rock with discrete crack, respectively. In both cases, the heat and pressure losses using air mass control and supplementary air injection are compared.

  15. Technical and economic aspects of operation of thermal and hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Bjoern Harald

    1997-12-31

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs.

  16. Technical and economic aspects of operation of thermal and hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Bjoern Harald

    1998-12-31

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs.

  17. Technical and economic aspects of operation of thermal and hydro power systems

    International Nuclear Information System (INIS)

    Bakken, Bjoern Harald.

    1997-01-01

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs

  18. The Hill Chart Calculation for Pelton Runner Models using the HydroHillChart - Pelton Module Software

    Directory of Open Access Journals (Sweden)

    Adelina Bostan

    2015-07-01

    Full Text Available The Pelton turbines industrial design is based on the hill chart characteristics obtained by measuring the models. Primary data measurements used to obtain the hill chart can be processed graphically, by hand or by using graphic programs respectively CAD programs; the HydroHillChart - Pelton module software is a specialized tool in achieving the hill chart, using interpolation cubic spline functions. Thereby, based on measurements of several models of Pelton turbines, a computerized library, used to design industrial Pelton turbines can be created. The paper presents the universal characteristics calculated by using the HydroHillChart - Pelton module software for a series of Pelton runners.

  19. The residential dual-energy program of Hydro-Quebec: An economic analysis

    International Nuclear Information System (INIS)

    Bergeron, C.; Bernard, J.-T.

    1991-01-01

    Higher than expected electricity consumption in recent years and increasing objections to capacity expansion on environmental grounds have led Quebec's government-owned electric utility, Hydro-Quebec, to launch an innovative program to reduce peak period residential electric heating demand. When the outside temperature drops below -12 degree C, customers who have opted for the program are charged 10 cents/kWh for their electricity (substantially above the 4.46 cents/kWh paid by normal residential customers) and they are automatically switched to a non-electric heating source, whereas above -12 degree C they pay 2.75 cents/kWh for all uses. A cost benefit analysis of this dual energy program finds that if, as Hydro-Quebec forecasts, 150,000 residential customers were to opt for this program, they would benefit by $19.0 million per year, while the utility and the government would lose $21.6 million and $1.6 million respectively, with a total net loss to Quebec society of $4.25 million a year. 12 refs., 4 figs., 6 tabs

  20. Invitations to tenders from Hydro-Quebec: many projects, little MW?

    International Nuclear Information System (INIS)

    Turmel, A.

    2004-01-01

    Topics discussed include the regulatory and jurisdictional framework governing the tendering process, and the difficulties involved in filing applications. The roles of Hydro-Quebec, the Quebec government, and the Quebec government's economic regulation agency, Regie de l'energie were covered

  1. Hydro under shock

    International Nuclear Information System (INIS)

    Maffezzini, I.; Pineault, E.; Poirier, M.

    1997-01-01

    A discussion of the potential privatisation of Hydro-Quebec, and of the motivation to do so, was presented. The creation of Hydro-Quebec resulted from the nationalization in 1963 of all major electricity producers in the province of Quebec. Since its inception, Hydro-Quebec has gone through many episodes of restructuring but none more far reaching in extent, or in consequences, than the present one. The current deregulation of the electrical industry in Quebec, and the potential commercialization of Hydro-Quebec is considered to be a natural and inevitable result of the current global trend towards competition in the power industry and the demand for greater consumer choice. 1 tab

  2. Hydro-climatology

    DEFF Research Database (Denmark)

    The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal with under......The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal...... considered. The interdisciplinary approach reveals information and perspective that go beyond the study of cli ate and hydro gy alone...

  3. Proposed Hydro-Quebec development plan, 1993: Proposal

    International Nuclear Information System (INIS)

    1992-01-01

    The Quebec government now requires Hydro-Quebec to submit a development plan every three years instead of annually, in order to permit more in-depth studies and a broader consultation with interested parties. In the first of such three-year plans, a series of plan proposals is presented which was developed after a year of consultation with various groups on four fundamental matters: energy efficiency, means of generation, electro-intensive industries, and electricity exports. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. Hydroelectricity will continue to be emphasized as the main source of generation since hydroelectric facilities offer distinct advantages in terms of costs, environmental impacts, and economic spinoffs. The proposed plan also presents objectives and strategies for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 5 figs., 15 tabs

  4. Marginal-cost pricing for Hydro-Quebec residential customers

    International Nuclear Information System (INIS)

    Paquin, C.

    1994-02-01

    An option available to governments and to utilities such as Hydro-Quebec for responding to objectives of energy efficiency is the adoption of marginal cost pricing. Compared to currently used price structures, marginal cost pricing will allow improvement of price signals and assure an optimal utilization of the resource. That type of pricing could be economically beneficial but may not be desirable from the point of view of revenue distribution. Taking account of Hydro-Quebec's cost structure, pure marginal cost pricing would generate an income that would be strongly contested on equity grounds. For example, it would raise prices 60% for residential customers. Faced with this possibility, an analysis is presented of the impact of a peak-offpeak pricing (or pure marginal cost pricing) on Hydro-Quebec's residential customer energy bills. The marginal costs of Hydro-Quebec are calculated by the method of Bernard and Chatel (1985) and analysis of the results is based on Friedman and Weare (1993). A sample of 28,417 residential customers from a 1989 Hydro-Quebec survey is used in the study. Two scenarios are analyzed; the first allowing comparison of the energy bill only on the basis of marginal costs and of average costs, and the second allowing comparison of the impact of marginal cost pricing on the total bill. In the first scenario, the impact translates into a 31% increase in energy bills for the entire customer class considered; in addition, this impact is inversely proportional to the revenue class. In the second scenario, the increase is 24%. 33 refs., 10 figs., 53 tabs

  5. Contribution to Quebec's economic development: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The activities of Hydro-Quebec are analyzed from the standpoint of their contribution to economic development and their support of regional development. The structuring effects of Hydro-Quebec's electricity supply activities are described, specifically the utility's role as an employer and an important agent of economic development by virtue of its purchasing power. The role played by research and development activities in the technological development of Quebec is discussed along with the contribution of those activities to new industrial developments. Finally, the impacts of electricity use on industrial development are considered. An analysis is presented of Hydro-Quebec's marketing activities and the options they afford. These marketing activities are aimed mainly at supporting economic development. The availability of reasonably priced electricity enhances the competitiveness of all industrial sectors, especially those for which electricity is a factor in siting. Furthermore, Hydro-Quebec can use its marketing activities to reinforce this comparative advantage. Hydro-Quebec can also support regional development by decentralizing operations, standardizing rates, and extending its marketing activities to the regions. 2 tabs

  6. A tale of three hydros - post-privatisation in Patagonia

    International Nuclear Information System (INIS)

    Smith, H.F.

    1994-01-01

    When Argentina's state-owned utility, operating in northern Patagonia, sold off hydro-electric generating plants in 1993, they were bought by several North American utility companies. This article looks at the problems these companies encountered and examines whether the enterprise has shown itself to be economically valuable. (UK)

  7. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and

  8. Applying a System Dynamics Approach for Modeling Groundwater Dynamics to Depletion under Different Economical and Climate Change Scenarios

    Directory of Open Access Journals (Sweden)

    Hamid Balali

    2015-09-01

    Full Text Available In the recent decades, due to many different factors, including climate change effects towards be warming and lower precipitation, as well as some structural policies such as more intensive harvesting of groundwater and low price of irrigation water, the level of groundwater has decreased in most plains of Iran. The objective of this study is to model groundwater dynamics to depletion under different economic policies and climate change by using a system dynamics approach. For this purpose a dynamic hydro-economic model which simultaneously simulates the farmer’s economic behavior, groundwater aquifer dynamics, studied area climatology factors and government economical policies related to groundwater, is developed using STELLA 10.0.6. The vulnerability of groundwater balance is forecasted under three scenarios of climate including the Dry, Nor and Wet and also, different scenarios of irrigation water and energy pricing policies. Results show that implementation of some economic policies on irrigation water and energy pricing can significantly affect on groundwater exploitation and its volume balance. By increasing of irrigation water price along with energy price, exploitation of groundwater will improve, in so far as in scenarios S15 and S16, studied area’s aquifer groundwater balance is positive at the end of planning horizon, even in Dry condition of precipitation. Also, results indicate that climate change can affect groundwater recharge. It can generally be expected that increases in precipitation would produce greater aquifer recharge rates.

  9. Nonlinear modeling and stability analysis of hydro-turbine governing system with sloping ceiling tailrace tunnel under load disturbance

    International Nuclear Information System (INIS)

    Guo, Wencheng; Yang, Jiandong; Wang, Mingjiang; Lai, Xu

    2015-01-01

    Highlights: • Novel nonlinear mathematical model of hydro-turbine governing system is proposed. • Hopf bifurcation analysis on the governing system is conducted. • Stability of the system under load disturbance is studied. • Influence of four factors on stability is analyzed. • Optimization methods of improving system stability are put forward. - Abstract: In order to overcome the problem of nonlinear dynamics of hydro-turbine governing system with sloping ceiling tailrace tunnel, which is caused by the interface movement of the free surface-pressurized flow in the tailrace tunnel, and the difficulty of analyzing the stability of system, this paper uses the Hopf bifurcation theory to study the stability of hydro-turbine governing system of hydropower station with sloping ceiling tailrace tunnel. Firstly, a novel and rational nonlinear mathematical model of the hydro-turbine governing system is proposed. This model contains the dynamic equation of pipeline system which can accurately describe the motion characteristics of the interface of free surface-pressurized flow in sloping ceiling tailrace tunnel. According to the nonlinear mathematical model, the existence and direction of Hopf bifurcation of the nonlinear dynamic system are analyzed. Furthermore, the algebraic criterion of the occurrence of Hopf bifurcation is derived. Then the stability domain and bifurcation diagram of hydro-turbine governing system are drawn by the algebraic criterion, and the characteristics of stability under different state parameters are investigated. Finally, the influence of step load value, ceiling slope angle and section form of tailrace tunnel and water depth at the interface in tailrace tunnel on stability are analyzed based on stable domain. The results indicate that: The Hopf bifurcation of hydro-turbine governing system with sloping ceiling tailrace tunnel is supercritical. The phase space trajectories of characteristic variables stabilize at the equilibrium points

  10. Method for assessing wind power integration in a hydro based power system

    International Nuclear Information System (INIS)

    Norheim, I.; Palsson, M.; Tande, J.O.G.; Uhlen, K.

    2006-01-01

    The present paper demonstrates a method for assessment of how much wind power that can be integrated in a system with limited transmission capacity. Based on hydro inflow data and wind measurements (for different locations of planned wind farms in an area) it is possible to assess how much wind power that can be fed into a certain point in the transmission network without violating the transmission capacity limits. The proposed method combines the use of market modelling and detailed network analysis in order to assess the probability of network congestions rather than focusing on extreme cases. By computing the probability distribution of power flow on critical corridors in the grid it is possible to assess the likelihood of network congestions and the amount of energy that must be curtailed to fulfil power system security requirements (n-1). This way the assessment is not only made of worst case scenarios, assuming maximal flow from hydro plants and maximal wind power production. As extreme case scenarios are short term and may be solved by market mechanisms or automatic system protection schemes (disconnection of wind power or hydro power), the proposed method may reveal that it would be economic to install more wind power than if only based on analysis of worst case scenarios. (orig.)

  11. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    McCredie, J.

    1984-01-01

    This report briefly describes Ontario Hydro's nuclear program, examining the design and construction status, and the future from Ontario Hydro's perspective. Ontario Hydro relies heavily on nuclear power. Nuclear fuel was responsible for approximately 34% of Ontario Hydro's energy production in 1983. The nuclear proportion was supplied by twelve operating units located: NPD, Douglas Point, Pickering A and B. It is expected that by approximately 1992, 65% of the total energy needs will be generated through nuclear power

  12. Towards a Managed Aquifer Recharge strategy for Gujarat, India: An economist’s dialogue with hydro-geologists

    Science.gov (United States)

    Shah, Tushaar

    2014-10-01

    Gujarat state in Western India exemplifies all challenges of an agrarian economy founded on groundwater overexploitation sustained over decades by perverse energy subsidies. Major consequences are: secular decline in groundwater levels, deterioration of groundwater quality, rising energy cost of pumping, soaring carbon footprint of agriculture and growing financial burden of energy subsidies. In 2009, Government of Gujarat asked the present author, an economist, to chair a Taskforce of senior hydro-geologists and civil engineers to develop and recommend a Managed Aquifer Recharge (MAR) strategy for the state. This paper summarizes the recommended strategy and its underlying logic. It also describes the imperfect fusion of socio-economic and hydro-geologic perspectives that occurred in course of the working of the Taskforce and highlights the need for trans-disciplinary perspectives on groundwater governance.

  13. Coupling of a distributed stakeholder-built system dynamics socio-economic model with SAHYSMOD for sustainable soil salinity management - Part 1: Model development

    Science.gov (United States)

    Inam, Azhar; Adamowski, Jan; Prasher, Shiv; Halbe, Johannes; Malard, Julien; Albano, Raffaele

    2017-08-01

    Effective policies, leading to sustainable management solutions for land and water resources, require a full understanding of interactions between socio-economic and physical processes. However, the complex nature of these interactions, combined with limited stakeholder engagement, hinders the incorporation of socio-economic components into physical models. The present study addresses this challenge by integrating the physical Spatial Agro Hydro Salinity Model (SAHYSMOD) with a participatory group-built system dynamics model (GBSDM) that includes socio-economic factors. A stepwise process to quantify the GBSDM is presented, along with governing equations and model assumptions. Sub-modules of the GBSDM, describing agricultural, economic, water and farm management factors, are linked together with feedbacks and finally coupled with the physically based SAHYSMOD model through commonly used tools (i.e., MS Excel and a Python script). The overall integrated model (GBSDM-SAHYSMOD) can be used to help facilitate the role of stakeholders with limited expertise and resources in model and policy development and implementation. Following the development of the integrated model, a testing methodology was used to validate the structure and behavior of the integrated model. Model robustness under different operating conditions was also assessed. The model structure was able to produce anticipated real behaviours under the tested scenarios, from which it can be concluded that the formulated structures generate the right behaviour for the right reasons.

  14. Thermo-hydro-mechanical modelling of buffer, synthesis report

    International Nuclear Information System (INIS)

    Toprak, E.; Mokni, N.; Olivella, S.; Pintado, X.

    2013-08-01

    This study addresses analyses of coupled thermo-hydro-mechanical (THM) processes in a scheme considered for the spent nuclear fuel repository in Olkiluoto (Finland). The finite element code CODE B RIGHT is used to perform modelling calculations. The objective of the THM modelling was to study some fundamental design parameters. The time required to reach full saturation, the maximum temperature reached in the canister, the deformations in the buffer-backfill interface, the stress-deformation balance between the buffer and the backfill, the swelling pressure developed and the homogenization process development are critical variables. Because of the complexity of the THM processes developed, only a single deposition hole has been modelled with realistic boundary conditions which take into account the entire repository. A thermal calculation has been performed to adopt appropriate boundary conditions for a reduced domain. The modelling has been done under axisymmetric conditions. As a material model for the buffer bentonite and backfill soil, the Barcelona Basic Model (BBM) has been used. Simulation of laboratory tests conducted at B and Tech under supervision of Posiva has been carried out in order to determine the fundamental mechanical parameters for modelling the behaviour of MX-80 bentonite using the BBM model. The modelling process of the buffer-backfill interface is an essential part of tunnel backfill design. The calculations will aim to determine deformations in this intersection, the behaviour of which is important for the buffer swelling. The homogenization process is a key issue as well. Porosity evolution during the saturation process is evaluated in order to check if the final saturated density accomplishes the homogenization requirements. This report also describes the effect of the existence of an air-filled gap located between the canister and the bentonite block rings in thermo-hydro-mechanical behaviour of the future spent nuclear fuel repository in

  15. Thermo-hydro-mechanical modelling of buffer, synthesis report

    Energy Technology Data Exchange (ETDEWEB)

    Toprak, E.; Mokni, N.; Olivella, S. [Universitat Politecnica de Catalunya, Barcelona (Spain); Pintado, X. [B and Tech Oy, Helsinki (Finland)

    2013-08-15

    This study addresses analyses of coupled thermo-hydro-mechanical (THM) processes in a scheme considered for the spent nuclear fuel repository in Olkiluoto (Finland). The finite element code CODE{sub B}RIGHT is used to perform modelling calculations. The objective of the THM modelling was to study some fundamental design parameters. The time required to reach full saturation, the maximum temperature reached in the canister, the deformations in the buffer-backfill interface, the stress-deformation balance between the buffer and the backfill, the swelling pressure developed and the homogenization process development are critical variables. Because of the complexity of the THM processes developed, only a single deposition hole has been modelled with realistic boundary conditions which take into account the entire repository. A thermal calculation has been performed to adopt appropriate boundary conditions for a reduced domain. The modelling has been done under axisymmetric conditions. As a material model for the buffer bentonite and backfill soil, the Barcelona Basic Model (BBM) has been used. Simulation of laboratory tests conducted at B and Tech under supervision of Posiva has been carried out in order to determine the fundamental mechanical parameters for modelling the behaviour of MX-80 bentonite using the BBM model. The modelling process of the buffer-backfill interface is an essential part of tunnel backfill design. The calculations will aim to determine deformations in this intersection, the behaviour of which is important for the buffer swelling. The homogenization process is a key issue as well. Porosity evolution during the saturation process is evaluated in order to check if the final saturated density accomplishes the homogenization requirements. This report also describes the effect of the existence of an air-filled gap located between the canister and the bentonite block rings in thermo-hydro-mechanical behaviour of the future spent nuclear fuel

  16. Optimal hydro scheduling and offering strategies considering price uncertainty and risk management

    International Nuclear Information System (INIS)

    Catalão, J.P.S.; Pousinho, H.M.I.; Contreras, J.

    2012-01-01

    Hydro energy represents a priority in the energy policy of Portugal, with the aim of decreasing the dependence on fossil fuels. In this context, optimal hydro scheduling acquires added significance in moving towards a sustainable environment. A mixed-integer nonlinear programming approach is considered to enable optimal hydro scheduling for the short-term time horizon, including the effect of head on power production, start-up costs related to the units, multiple regions of operation, and constraints on discharge variation. As new contributions to the field, market uncertainty is introduced in the model via price scenarios and risk management is included using Conditional Value-at-Risk to limit profit volatility. Moreover, plant scheduling and pool offering by the hydro power producer are simultaneously considered to solve a realistic cascaded hydro system. -- Highlights: ► A mixed-integer nonlinear programming approach is considered for optimal hydro scheduling. ► Market uncertainty is introduced in the model via price scenarios. ► Risk management is included using conditional value-at-risk. ► Plant scheduling and pool offering by the hydro power producer are simultaneously considered. ► A realistic cascaded hydro system is solved.

  17. HydroSoft coil versus HydroCoil for endovascular aneurysm occlusion study: A single center experience

    International Nuclear Information System (INIS)

    Guo Xinbin; Fan Yimu; Zhang Jianning

    2011-01-01

    Background and purpose: The HydroCoil Embolic System (HES) was developed to reduce recurrences of aneurysms relative to platinum coils. But the HydroCoil Embolic System was characterized with many limitations. The manufacturer had recognized the challenge and recently a new design of hydrogel-coated coil-HydroSoft has become available in the market as the new generation HydroCoil. We reported our initial experience using HydroSoft coil versus HydroCoil in our center. Methods: 75 aneurysms embolized primarily using HydroSoft Coils from July 2008 to May 2009 were compared with 66 volume- and shape-matched aneurysms treated with HydroCoils from March 2006 to August 2008. Outcome measures included length and number of coils used, contrast volume, and length of hospital stay. During embolization, a stable framework was first established with bare coils, and hydrogel-coated coils were used subsequently to increase the packing density. Follow-up angiographic results 6 months after treatment were evaluated among some of the patients. Results: Successful coil embolization was achieved in all patients. There were no differences in average total coil length used per aneurysm. There were no differences in length of hospital stay and packing density. HydroSoft coils were more suitable using as the finishing or final coil. HydroSoft coil decreased the procedure-related retreated rates, and aneurysm packing was finished with soft, flexible HydroSoft coil and decreased the neck remnant rates. Follow-up angiography in HydroSoft-treated patients at 6 months revealed aneurysm stability without significant residual neck. Conclusions: HydroSoft coil allowed us to deploy coated coils with good packing density. A slight expansion of these coils at the neck can be expected to reduce neck remnant and potentially inhibit recurrence.

  18. Proposed Hydro-Quebec development plan, 1990-1992: Horizon 1999

    International Nuclear Information System (INIS)

    1990-01-01

    The supply and demand for electric power in Quebec are reviewed and forecasts of future demand are established, using various scenarios of demographic, economic, and energy development. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. In addition, objectives and strategies are presented for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 36 figs., 54 tabs

  19. An approach to the investment analysis of small and medium hydro-power plants

    International Nuclear Information System (INIS)

    Forouzbakhsh, F.; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in 'Bookan, Iran' and SHPP in 'Nari, Iran'), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially

  20. Revitalizing the nuclear business at Ontario Hydro

    International Nuclear Information System (INIS)

    Talbot, K.

    1994-01-01

    Ontario Hydro, North America's largest electric power utility, with an installed capacity of 34,000 MW, has under gone a major restructuring over the past year to better align itself with a changing electricity market and evolving customer needs. The single largest new business unit within the new Ontario Hydro is Ontario Hydro Nuclear (OHN), responsible for engineering, operation and maintenance of the Corporation's 20 large nuclear units at three generating sites, OHN faces a significant challenge in returning Ontario's nuclear units to the world-leading performance levels they enjoyed in the past, particularly the older Pickering A and Bruce A plants. However, steady progress is being made as evidenced by improving peer reviews and overall capacity and financial performance

  1. Margins for uncertainties in Hydro-Quebec's short-term operations planning

    International Nuclear Information System (INIS)

    Beaumont, M.; Raymond, M.P.

    1995-01-01

    A method developed by Hydro-Quebec for establishing the short-term capacity margin requirements for dealing with uncertainties from 1 to 24 hours in advance, was presented. Hydro-Quebec's generating system and characterization of the problems associated with meeting load requirements were discussed. Factors accounted for included those concerning internal load forecast, unit forced outages, risks of not meeting firm load, risks of not meeting real-time reserves requirements, costs, time delays, and operating constraints of non-hydraulic resources. Each of these were described in detail, and methods for combining mathematical uncertainties were presented. Procedures used for selecting an appropriate risk level and building a margin policy were described. Improvements for more accurate modelling were discussed. 5 refs., 2 tabs., 5 figs

  2. Hydro-Quebec 2005 annual report : people with energy

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec generates, transmits and distributes electricity mainly produced by renewable energy sources. Its sole shareholder is the Quebec government. This annual report reviewed the operations of Hydro-Quebec, and provided data on energy sales, production and details of the utility's environmental programs. Information on Hydro-Quebec subsidiaries in 2005 was presented in the following separate sections: Hydro-Quebec Production; Hydro-Quebec TransEnergie; Hydro-Quebec Distribution; Hydro-Quebec Equipement; and the Societe d'energie de la Baie James. In 2005, Hydro-Quebec Distribution signed contracts for an initial block of 990 MW of wind power and issued a tender call for an additional 2000 MW of wind power. A generator balancing service was created and authorized by the Regie de l'energie. Hydro-Quebec customers have achieved energy savings of nearly 450 GWh in 2005. The commissioning of Toulnustouc generating station was achieved 5 months ahead of schedule. The 526 MW facility will generate 2.7 TWh annually. Work at the Chute-Allard and Rapide-des-Coeurs sites has continued, as well as construction at Mercier and Peribonka and Eastmain-1. Income from continuing operations came to $2.25 billion, a $124 million increase that was attributed to a rise in domestic sales and net short-term exports. The income was offset by higher pension expenses, depreciation and amortization, as well as by cost of supply on external markets and financial expenses. All other operating expenses were lower than in 2004. Capital spending for the transmission system reached its highest level since 1997, with $793 million invested, including $336 million to meet growth. Data on the company's financial performance, executive changes and reorganization were provided. Financial statements included a review and analysis of financial transactions, an auditor's report, as well as customary notes to the consolidated financial statement including balance sheets, assets, liabilities and

  3. Propagation of hydro-meteorological uncertainty in a model cascade framework to inundation prediction

    Science.gov (United States)

    Rodríguez-Rincón, J. P.; Pedrozo-Acuña, A.; Breña-Naranjo, J. A.

    2015-07-01

    This investigation aims to study the propagation of meteorological uncertainty within a cascade modelling approach to flood prediction. The methodology was comprised of a numerical weather prediction (NWP) model, a distributed rainfall-runoff model and a 2-D hydrodynamic model. The uncertainty evaluation was carried out at the meteorological and hydrological levels of the model chain, which enabled the investigation of how errors that originated in the rainfall prediction interact at a catchment level and propagate to an estimated inundation area and depth. For this, a hindcast scenario is utilised removing non-behavioural ensemble members at each stage, based on the fit with observed data. At the hydrodynamic level, an uncertainty assessment was not incorporated; instead, the model was setup following guidelines for the best possible representation of the case study. The selected extreme event corresponds to a flood that took place in the southeast of Mexico during November 2009, for which field data (e.g. rain gauges; discharge) and satellite imagery were available. Uncertainty in the meteorological model was estimated by means of a multi-physics ensemble technique, which is designed to represent errors from our limited knowledge of the processes generating precipitation. In the hydrological model, a multi-response validation was implemented through the definition of six sets of plausible parameters from past flood events. Precipitation fields from the meteorological model were employed as input in a distributed hydrological model, and resulting flood hydrographs were used as forcing conditions in the 2-D hydrodynamic model. The evolution of skill within the model cascade shows a complex aggregation of errors between models, suggesting that in valley-filling events hydro-meteorological uncertainty has a larger effect on inundation depths than that observed in estimated flood inundation extents.

  4. 76 FR 67175 - Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp...

    Science.gov (United States)

    2011-10-31

    ...; 14149-000] Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp... Lock Hydro Friends Fund XXXVI (Lock Hydro) and on April 11, 2011, Arkansas Electric Cooperative Corp... & Dam No. 3, as directed by the Corps. Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090...

  5. Hydro-energy

    International Nuclear Information System (INIS)

    Bacher, P.; Tardieu, B.

    2005-01-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  6. HydroViz: evaluation of a web-based tool for improving hydrology education

    Science.gov (United States)

    Habib, E.; Ma, Y.; Williams, D.; Sharif, H.; Hossain, F.

    2012-02-01

    HydroViz is a web-based, student-centered, highly visual educational tool designed to support active learning in the field of Engineering Hydrology. The development of HydroViz is informed by recent advances in hydrologic data, numerical simulations, visualization and web-based technologies. An evaluation study was conducted to determine the effectiveness of HydroViz, to examine the buy-in of the program, and to identify project components that need to be improved. A total of 182 students from seven freshmen and junior-/senior-level undergraduate classes in three universities participated in the study over the course of two semesters (spring 2010 and fall 2010). Data sources included homework assignments, online surveys, and informal interviews with students. Descriptive statistics were calculated for homework and the survey. Qualitative analysis of students' comments and informal interview notes were also conducted to identify ideas and patterns. HydroViz was effective in facilitating students' learning and understanding of hydrologic concepts and increasing related skills. Students had positive perceptions of various features of HydroViz and they believe that HydroViz fits well in the curriculum. The experience with HydroViz was somewhat effective in raising freshmen civil engineering students' interest in hydrology. In general, HydroViz tend to be more effective with students in junior- or senior-level classes than students in freshmen classes. There does not seem to be obvious differences between different universities. Students identified some issues that can be addressed to improve HydroViz. Future adaptation and expansion studies are under planning to scale-up the application and utility of HydroViz into various hydrology and water-resource engineering curriculum settings.

  7. Assessment of the Effects of Various Precipitation Forcings on Flood Forecasting Potential Using WRF-Hydro Modeling

    Science.gov (United States)

    Zhang, J.; Fang, N. Z.

    2017-12-01

    A potential flood forecast system is under development for the Upper Trinity River Basin (UTRB) in North Central of Texas using the WRF-Hydro model. The Routing Application for the Parallel Computation of Discharge (RAPID) is utilized as channel routing module to simulate streamflow. Model performance analysis was conducted based on three quantitative precipitation estimates (QPE): the North Land Data Assimilation System (NLDAS) rainfall, the Multi-Radar Multi-Sensor (MRMS) QPE and the National Centers for Environmental Prediction (NCEP) quality-controlled stage IV estimates. Prior to hydrologic simulation, QPE performance is assessed on two time scales (daily and hourly) using the Community Collaborative Rain, Hail and Snow Network (CoCoRaHS) and Hydrometeorological Automated Data System (HADS) hourly products. The calibrated WRF-Hydro model was then evaluated by comparing the simulated against the USGS observed using various QPE products. The results imply that the NCEP stage IV estimates have the best accuracy among the three QPEs on both time scales, while the NLDAS rainfall performs poorly because of its coarse spatial resolution. Furthermore, precipitation bias demonstrates pronounced impact on flood forecasting skills, as the root mean squared errors are significantly reduced by replacing NLDAS rainfall with NCEP stage IV estimates. This study also demonstrates that accurate simulated results can be achieved when initial soil moisture values are well understood in the WRF-Hydro model. Future research effort will therefore be invested on incorporating data assimilation with focus on initial states of the soil properties for UTRB.

  8. Development of the financial model for analyses on economic performances of nuclear facilities and examples of its applications

    International Nuclear Information System (INIS)

    Mankin, Shuichi; Ueno, Seiichi; Kimura, Shigeru; Yuasa, Tadao.

    1988-10-01

    On the assumption of the commercialization stage of technologies, the analysis on performances in financial operation based on simulation studies is one of important study subjects in the field of the system analysis and economic assessments of nuclear technologies. However, economic assessments on financial performances of such complex industries as nuclear power based on nuclear fuel cycle industries, or as electric utilities composed of hydro, fossil, nuclear power stations are complicated, and the adoption of conventional financial model is insufficient in the case of nuclear technologies which have such special financial process as decommissioning. We, therefore, develop the computer simulation model that can analyze financial performances of nuclear facilities. In this report, the derivation of equations and outlines of the model are explained. Additionally, examples of hypothetical financial simulation studies on a coal-gasoline plant, nuclear waste industries, and analysis on economic perspectives of small size nuclear reactors for electric utilities are indicated. (author)

  9. Opening new horizons, building new synergies : 1998 annual report of Hydro-Quebec International

    International Nuclear Information System (INIS)

    1999-01-01

    Hydro-Quebec International (HQI) was established in 1978 as a wholly owned subsidiary of Hydro-Quebec. Its mission is to contribute to Hydro-Quebec's growth and profitability by investing in energy partnerships and by selling Hydro-Quebec expertise internationally. This annual report presents highlights of the company's operations, balance sheet, financial position, and investments. 1998 proved to be a year of market development and prospecting which yielded promising results. The expanded scope of the company that now includes investment and infrastructure construction was already generating $ 26 million in economic spinoff for Quebec. The report highlights HQI's involvement in Europe, the Middle East, Africa, and Asia. Great strides have been made also in ensuring the most rigorous practices possible to assess and manage risk and to bolster the company's ability to take unforeseen events in stride. On the investment side, in 1998, the first year of its involvement as an investor, HQI initiated investments amounting to $137 million. Plans are to double that figure in 1999. tabs., figs

  10. The Ontario Hydro approach to assuring quality in nuclear heat exchanger tubing

    International Nuclear Information System (INIS)

    Maka, E.P.

    1982-01-01

    Ontario Hydro utilizes the CANDU PHWR reactor system. The heat transport system circulates pressurized heavy water through the reactor fuel channels to remove heat produced by the fission of uranium fuel. Heavy water is used for the heat transport medium because it is the most efficient liquid from the standpoint of neutron economy. The heat is carried by the reactor coolant to the steam generators where it is transferred to the light water side to form steam which drives the turbine generators. Many heat exchangers are incorporated in the heat transfer cycle. Their integrity is of prime importance both for the reliability of the power plant and for economic reasons since the loss of heavy water at $300/kg is a substantial penalty. This integrity depends largely on the quality of the heat exchanger tubing and where major heat exchangers are involved, it has been the Ontario Hydro policy to supply tubing to heat exchanger manufacturers on a ''free issue'' basis. This allows better control over the level of inspection perform

  11. An approach to the investment analysis of small and medium hydro-power plants

    Energy Technology Data Exchange (ETDEWEB)

    Forouzbakhsh, F. [University of Tehran (Iran). Faculty of Engineering; Hosseini, S.M.H. [Islamic Azad University, Tehran (Iran). Faculty of Engineering; Vakilian, M. [Sharif Institute of Technology, Tehran (Iran). Faculty of Electrical Engineering

    2007-02-15

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in ''Bookan, Iran'' and SHPP in ''Nari, Iran''), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially. (author)

  12. Modelling the economic impact of three lameness causing diseases using herd and cow level evidence.

    Science.gov (United States)

    Ettema, Jehan; Østergaard, Søren; Kristensen, Anders Ringgaard

    2010-06-01

    Diseases to the cow's hoof, interdigital skin and legs are highly prevalent and of large economic impact in modern dairy farming. In order to support farmer's decisions on preventing and treating lameness and its underlying causes, decision support models can be used to predict the economic profitability of such actions. An existing approach of modelling lameness as one health disorder in a dynamic, stochastic and mechanistic simulation model has been improved in two ways. First of all, three underlying diseases causing lameness were modelled: digital dermatitis, interdigital hyperplasia and claw horn diseases. Secondly, the existing simulation model was set-up in way that it uses hyper-distributions describing diseases risk of the three lameness causing diseases. By combining information on herd level risk factors with prevalence of lameness or prevalence of underlying diseases among cows, marginal posterior probability distributions for disease prevalence in the specific herd are created in a Bayesian network. Random draws from these distributions are used by the simulation model to describe disease risk. Hereby field data on prevalence is used systematically and uncertainty around herd specific risk is represented. Besides the fact that estimated profitability of halving disease risk depended on the hyper-distributions used, the estimates differed for herds with different levels of diseases risk and reproductive efficiency. (c) 2010 Elsevier B.V. All rights reserved.

  13. Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Pousinho, H.M.I.; Mendes, V.M.F.

    2010-01-01

    This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.

  14. Advances in the implementation of a generic long term model for the hydro industry

    International Nuclear Information System (INIS)

    Welt, F.

    2004-01-01

    This presentation describes the Vista Long Term (LT) simulation and decision tool developed for the hydropower and water resource industries by Synexus Global. Vista maximizes the value of hydro resources while addressing environmental concerns. It improves water resource management for all uses over the long term. The tool has been used and adapted to many systems around the world, including Bonneville Power Administration, Reliant Energy, PacifiCorp and Great Lakes Power in the United States and Nova Scotia Power, Yukon Energy, and Newfoundland Hydro in Canada. Vista also helps to plan alternative operating policies and system upgrades by maximizing the expected value of generation and transactions. The tool provides reservoir releases, generation, flows, levels and transactions. Hydroelectric generating facilities that use the Vista tool have improved clean energy production as well as increased revenues resulting from reservoir and plant optimization. tabs., figs

  15. Ontario Hydro's DSP update

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Ontario Hydro's Demand/Supply Plan (DSP), the 25 year plan which was submitted in December 1989, is currently being reviewed by the Environmental Assessment Board (EAB). Since 1989 there have been several changes which have led Ontario Hydro to update the original Demand/Supply Plan. This information sheet gives a quick overview of what has changed and how Ontario Hydro is adapting to that change

  16. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented... Hydro-WM, LLC. The project is located on the Rockfish River in Nelson County, Virginia. The transfer of...

  17. Optimal Capacity Proportion and Distribution Planning of Wind, Photovoltaic and Hydro Power in Bundled Transmission System

    Science.gov (United States)

    Ye, X.; Tang, Q.; Li, T.; Wang, Y. L.; Zhang, X.; Ye, S. Y.

    2017-05-01

    The wind, photovoltaic and hydro power bundled transmission system attends to become common in Northwest and Southwest of China. To make better use of the power complementary characteristic of different power sources, the installed capacity proportion of wind, photovoltaic and hydro power, and their capacity distribution for each integration node is a significant issue to be solved in power system planning stage. An optimal capacity proportion and capacity distribution model for wind, photovoltaic and hydro power bundled transmission system is proposed here, which considers the power out characteristic of power resources with different type and in different area based on real operation data. The transmission capacity limit of power grid is also considered in this paper. Simulation cases are tested referring to one real regional system in Southwest China for planning level year 2020. The results verify the effectiveness of the model in this paper.

  18. Hydro-economic optimization model for selecting least cost programs of measures at the river basin scale. Application to the implementation of the EU Water Framework Directive on the Orb river basin (France).

    Science.gov (United States)

    Girard, C.; Rinaudo, J. D.; Caballero, Y.; Pulido-Velazquez, M.

    2012-04-01

    This article presents a case study which illustrates how an integrated hydro-economic model can be applied to optimize a program of measures (PoM) at the river basin level. By allowing the integration of hydrological, environmental and economic aspects at a local scale, this model is indeed useful to assist water policy decision making processes. The model identifies the least cost PoM to satisfy the predicted 2030 urban and agricultural water demands while meeting the in-stream flow constraints. The PoM mainly consists of water saving and conservation measures at the different demands. It includes as well some measures mobilizing additional water resources coming from groundwater, inter-basin transfers and improvement in reservoir operating rules. The flow constraints are defined to ensure a good status of the surface water bodies, as defined by the EU Water Framework Directive (WFD). The case study is conducted in the Orb river basin, a coastal basin in Southern France. It faces a significant population growth, changes in agricultural patterns and limited water resources. It is classified at risk of not meeting the good status by 2015. Urban demand is calculated by type of water users at municipality level in 2006 and projected to 2030 with user specific scenarios. Agricultural water demand is estimated at irrigation district (canton) level in 2000 and projected to 2030 under three agricultural development scenarios. The total annual cost of each measure has been calculated taken into account operation and maintenance costs as well as investment cost. A first optimization model was developed using GAMS, General Algebraic Modeling System, applying Mixed Integer Linear Programming. The optimization is run to select the set of measures that minimizes the objective function, defined as the total cost of the applied measures, while meeting the demands and environmental constraints (minimum in-stream flows) for the 2030 time horizon. The first result is an optimized Po

  19. Environmental and economic benefits of sustainable development

    International Nuclear Information System (INIS)

    McKay, P.; Kelly, B.; Passmore, J.

    1997-01-01

    The panel on sustainable development was moderated by Paul McKay of the Wildside Foundation. Bryan Kelly, Director of Environment and Sustainable Development at Ontario Hydro, and Jeffrey Passmore of Passmore Associates International were the panel members. Bryan Kelly described the objectives of his group's program as reducing market barriers, and get renewables on a level playing field through technological advances to ensure that ' when Ontario Hydro or its successors make decisions about new capacity, renewables will be a viable option and will not be dismissed out of hand'. To illustrate the approach, he described several ongoing research and development projects. Jeffrey Passmore reported on a study he conducted for the Canadian Wind Energy Association and Environment Canada to determine the environmental and economic benefits of wind energy in Canada. He estimated achievable wind energy potential in Canada at around 6400 MW by 2010. He stressed wind energy's potential for job creation and CO 2 reduction as the principal economic and environmental benefits

  20. Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-03-15

    This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach. (author)

  1. The Economics of Online Dating: A Course in Economic Modeling

    Science.gov (United States)

    Monaco, Andrew J.

    2018-01-01

    The author discusses the development of a unique course, The Economics of Online Dating. The course is an upper-level undergraduate course that combines intensive discussion, peer review, and economic theory to teach modeling skills to undergraduates. The course uses the framework of "online dating," interpreted broadly, as a point of…

  2. Reassessing the Economic Value of Advanced Level Mathematics

    Science.gov (United States)

    Adkins, Michael; Noyes, Andrew

    2016-01-01

    In the late 1990s, the economic return to Advanced level (A-level) mathematics was examined. The analysis was based upon a series of log-linear models of earnings in the 1958 National Child Development Survey (NCDS) and the National Survey of 1980 Graduates and Diplomates. The core finding was that A-level mathematics had a unique earnings premium…

  3. Thermo-hydro-mechanical behaviour of Boom clay; Comportement thermo-hydro-mecanique de l'argile de Boom

    Energy Technology Data Exchange (ETDEWEB)

    Le, T.T

    2008-01-15

    This thesis studied the thermo-hydro-mechanical properties of Boom clay, which was chosen to be the host material for the radioactive waste disposal in Mol, Belgium. Firstly, the research was concentrated on the soil water retention properties and the hydro-mechanical coupling by carrying out axial compression tests with suction monitoring. The results obtained permitted elaborating a rational experimental procedure for triaxial tests. Secondly, the systems for high pressure triaxial test at controlled temperature were developed to carry out compression, heating, and shearing tests at different temperatures. The obtained results showed clear visco-elasto-plastic behaviour of the soil. This behaviour was modelled by extending the thermo-elasto-plastic model of Cui et al. (2000) to creep effect. (author)

  4. A comparison of the aquatic impacts of large hydro and small hydro projects

    Science.gov (United States)

    Taylor, Lara A.

    The expansion of small hydro development in British Columbia has raised concerns surrounding the effects of these projects, and the provincial government's decision to proceed with Site C has brought attention to the impacts of large hydro. Together, these decisions highlight that there are impacts associated with all energy development. My study examines the aquatic effects of large and small hydro projects using two case study sites: Site C and the Upper Harrison Water Power Project. I first determine the aquatic effects of each of the case study sites. Next, I use existing literature and benefits transfer to determine the monetary value of these effects. My results suggest that, with mitigation, small hydro projects have less of an effect on the environment than a large hydro project per unit of electricity. I also describe the implications of my study in the context of current British Columbia energy policy. Keywords: hydropower; aquatic effects. Subject Terms: environmental impact assessment; benefits transfer.

  5. HydroSHEDS: A global comprehensive hydrographic dataset

    Science.gov (United States)

    Wickel, B. A.; Lehner, B.; Sindorf, N.

    2007-12-01

    The Hydrological data and maps based on SHuttle Elevation Derivatives at multiple Scales (HydroSHEDS) is an innovative product that, for the first time, provides hydrographic information in a consistent and comprehensive format for regional and global-scale applications. HydroSHEDS offers a suite of geo-referenced data sets, including stream networks, watershed boundaries, drainage directions, and ancillary data layers such as flow accumulations, distances, and river topology information. The goal of developing HydroSHEDS was to generate key data layers to support regional and global watershed analyses, hydrological modeling, and freshwater conservation planning at a quality, resolution and extent that had previously been unachievable. Available resolutions range from 3 arc-second (approx. 90 meters at the equator) to 5 minute (approx. 10 km at the equator) with seamless near-global extent. HydroSHEDS is derived from elevation data of the Shuttle Radar Topography Mission (SRTM) at 3 arc-second resolution. The original SRTM data have been hydrologically conditioned using a sequence of automated procedures. Existing methods of data improvement and newly developed algorithms have been applied, including void filling, filtering, stream burning, and upscaling techniques. Manual corrections were made where necessary. Preliminary quality assessments indicate that the accuracy of HydroSHEDS significantly exceeds that of existing global watershed and river maps. HydroSHEDS was developed by the Conservation Science Program of the World Wildlife Fund (WWF) in partnership with the U.S. Geological Survey (USGS), the International Centre for Tropical Agriculture (CIAT), The Nature Conservancy (TNC), and the Center for Environmental Systems Research (CESR) of the University of Kassel, Germany.

  6. Integrated Hydro-geomorphological Monitoring System of the Upper Bussento river basin (Cilento and Vallo Diano Geopark, S-Italy)

    Science.gov (United States)

    Guida, D.; Cuomo, A.; Longobardi, A.; Villani, P.; Guida, M.; Guadagnuolo, D.; Cestari, A.; Siervo, V.; Benevento, G.; Sorvino, S.; Doto, R.; Verrone, M.; De Vita, A.; Aloia, A.; Positano, P.

    2012-04-01

    The Mediterranean river ecosystem functionings are supported by river-aquifer interactions. The assessment of their ecological services requires interdisciplinary scientific approaches, integrate monitoring systems and inter-institutional planning and management. This poster illustrates the Hydro-geomorphological Monitoring System build-up in the Upper Bussento river basin by the University of Salerno, in agreement with the local Basin Autorities and in extension to the other river basins located in the Cilento and Vallo Diano National Park (southern Italy), recently accepted in the European Geopark Network. The Monitoring System is based on a hierarchical Hydro-geomorphological Model (HGM), improved in a multiscale, nested and object-oriented Hydro-geomorphological Informative System (HGIS, Figure 1). Hydro-objects are topologically linked and functionally bounded by Hydro-elements at various levels of homogeneity (Table 1). Spatial Hydro-geomorpho-system, HG-complex and HG-unit support respectively areal Hydro-objects, as basin, sector and catchment and linear Hydro-objects, as river, segment, reach and section. Runoff initiation points, springs, disappearing points, junctions, gaining and water losing points complete the Hydro-systems. An automatic procedure use the Pfafstetter coding to hierarchically divide a terrain into arbitrarily small hydro-geomorphological units (basin, interfluve, headwater and no-contribution areas, each with a unique label with hierarchical topological properties. To obtain a hierarchy of hydro-geomorphological units, the method is then applied recursively on each basin and interbasin, and labels of the subdivided regions are appended to the existing label of the original region. The monitoring stations are ranked consequently in main, secondary, temporary and random and located progressively at the points or sections representative for the hydro-geomorphological responses by validation control and modeling calibration. The datasets

  7. Manitoba Hydro 1998 progress report

    International Nuclear Information System (INIS)

    1998-11-01

    Manitoba Hydro has four commitments: 1) they will integrate climate change management into their plans and operations, 2) between 1991 and 2012 they will reduce their greenhouse gas emissions in excess of 6% below 1990 levels, 3) they anticipate that their greenhouse gas production will be in excess of 40% below their 1990 levels by 2010-11, and 4) they have the potential to make a greater contribution to national and international environmental and economic efforts by developing additional hydroelectric energy. The performance to date in implementing their strategy since 1990 includes: the 1330 megawatt Limestone Generating Station came into full production in 1992, which has increased electricity output without additional greenhouse gas emissions; four coal fueled generating units were removed from service at Brandon Generating Station in 1996, reducing coal generating capacity; seven communities previously served have been connected to the province's provincial grid, reducing the emissions from diesel generators; demand-side energy initiatives resulted in a saving of 45 megawatts since 1990, and supply-side initiatives, 152 megawatts; and net exports have increased significantly, from 2,296 megawatt hours in 1990 to 13,888 megawatt hours in 1997-98, which displaces energy that would otherwise have been produced at fossil-fueled generating stations. tabs

  8. Collaborative Modular Pumped Hydro Energy Storage Design Study

    Energy Technology Data Exchange (ETDEWEB)

    Bibeault, Mark Leonide [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Roybal, Adam [Jemez Mountain Electric Cooperative, Inc., Hernandez, NM (United States); Bailey, Jr., Richard J. [Northern New Mexico College, Espanola, NM (United States)

    2017-09-29

    In May of 2017, Los Alamos National Laboratory (LANL) through the Applied Engineering Technology Division, Jemez Mountain Electric Cooperative Inc. (JMEC), and Northern New Mexico College (NNMC) agreed to enter into a small, joint, non-binding Modular Pumped Hydro (MPH) design study related to grid level energy storage to begin a process of collaboration. Los Alamos National Laboratory's mission is to solve national security challenges through scientific excellence. The mission of Northern New Mexico College is to ensure student success by providing access to affordable, community-based learning opportunities that meet the educational, cultural, and economic needs of the region. Jemez Mountain Electric Cooperative Inc. is the largest electric co-op in the State of New Mexico providing affordable and reliable electricity to customers in the five counties of Rio Arriba, Santa Fe, San Juan, McKinley and Sandoval.

  9. Feasibility study of VLH hydro turbine installation at Nam Pung hydropower plant, Thailand

    Directory of Open Access Journals (Sweden)

    Weerapon Nuantong

    2016-10-01

    Full Text Available The aim of this research was to study the feasibility of installing a Very Low Head (VLH hydro turbine at downstream of the Nam Pung hydropower plant by increasing the potential of renewable energy sources for the Electricity Generating Authority of Thailand (EGAT. Due to the constraints of the local site, the water head level was limited to less than 2 meters and the flow rate to below 5 m3/ s. The hydro turbine selected was an axial flow turbine with performance of 86.4%. The outcome of the power output was 84.61 kW. Investment analysis was subsequently applied to estimate feasibility of the project using engineering economics. The analyses of results have shown that the project is worthwhile in terms of an investment decision. The payback period of actual price was 0.83 and 0.88 years and general price case of 3.68 and 4.04 years, along with an interest rate of 6.75% and 12.625% respectively. Projected project lifespan is 25 years.

  10. Implications of the Bangor Hydro decision on FERC relicensings

    Science.gov (United States)

    Pizzi, L.

    1997-01-01

    In the next 15 years, over 400 existing nonfederal dams will require new licenses by the Federal Energy Regulatory Commission (FERC) in order to continue operations. In many cases, state or federal agencies have a unique opportunity to condition the hydropower licenses to protect environmental values. In 1996, the Court of Appeals for the District of Columbia Circuit issued an opinion striking down a mandatory license condition imposed by the U.S. Department of the Interior in a FERC relicensing. The case, Bangor Hydro-Electric Company v.Federal Energy Regulatory Commission, is instructive for agencies regarding the procedures to be followed in imposing mandatory FERC licensing conditions in the future. After Bangor Hydro, agencies should: (1) support their decisions by substantial evidence in the FERC record, (2) request applicant studies to support agency decisions and allow public comment on the decisions as a means to test the facts and analysis, and (3) consider intervening in a case to defend the condition on appeal. Bangor Hydro also raises, but does not decide, the issue of whether the agency imposing the mandatory condition should engage in balancing the economics of the hydropower project with the public resources affected by the project.

  11. Comparative modelling approaches of hydro-mechanical processes in sealing experiments at the Tournemire URL

    Czech Academy of Sciences Publication Activity Database

    Millard, A.; Mokni, N.; Barnichon, J. D.; Thatcher, K. E.; Bond, A.; Fraser-Harris, A.; Mc Dermott, C.; Blaheta, Radim; Michalec, Zdeněk; Hasal, Martin; Nguyen, T.; Nasir, O.; Yi, H.; Kolditz, O.

    2017-01-01

    Roč. 76, č. 2 (2017), č. článku 78. ISSN 1866-6280 Institutional support: RVO:68145535 Keywords : hydro-mechanical (HM) coupling * numerical modelling * sealing systems * compacted bentonite–sand mixture Subject RIV: BA - General Mathematics OBOR OECD: Applied mathematics Impact factor: 1.569, year: 2016 https://link.springer.com/article/10.1007/s12665-016-6324-8

  12. Strategies for growth of hydro electric power

    International Nuclear Information System (INIS)

    Khera, D.V.

    1998-01-01

    Hydro power on account of its several inherent advantages has a key role to play in the development of long term energy strategies based on diversified and balance use of natural national resources. Our country is fortunate to be endowed with large hydro-electric potential. It is estimated that the hydro potential while fully developed may yield to an installed capacity of 1,50,000 MW. An attempt has been made in this paper to examine and analyse the status and trend of hydro power development, need for accelerated development of hydro power, myths about hydro electric projects, principal causes responsible for scaling down of hydro share in the total installed capacity and strategies which could restore optimum hydro thermal mix. (author)

  13. Urban water-quality modelling: implementing an extension to Multi-Hydro platform for real case studies

    Science.gov (United States)

    Hong, Yi; Giangola-Murzyn, Agathe; Bonhomme, Celine; Chebbo, Ghassan; Schertzer, Daniel

    2015-04-01

    During the last few years, the physically based and fully distributed numerical platform Multi-Hydro (MH) has been developed to simulate hydrological behaviours in urban/peri-urban areas (El-Tabach et al. , 2009 ; Gires et al., 2013 ; Giangola-Murzyn et al., 2014). This hydro-dynamical platform is open-access and has a modular structure, which is designed to be easily scalable and transportable, in order to simulate the dynamics and complex interactions of the water cycle processes in urban or peri-urban environment (surface hydrology, urban groundwater infrastructures and infiltration). Each hydrological module relies on existing and widely validated open source models, such as TREX model (Velleux, 2005) for the surface module, SWMM model (Rossman, 2010) for the drainage module and VS2DT model (Lappala et al., 1987) for the soil module. In our recent studies, an extension of MH has been set up by connecting the already available water-quality computational components among different modules, to introduce a pollutant transport modelling into the hydro-dynamical platform. As for the surface module in two-dimensions, the concentration of particles in flow is expressed by sediment advection equation, the settling of suspended particles is calculated with a simplified settling velocity formula, while the pollutant wash-off from a given land-use is represented as a mass rate of particle removal from the bottom boundary over time, based on transport capacity, which is computed by a modified form of Universal Soil Loss Equation (USLE). Considering that the USLE is originally conceived to predict soil losses caused by runoff in agriculture areas, several adaptations were needed to use it for urban areas, such as the alterations of USLE parameters according to different criterions, the definition of the appropriate initial dust thickness corresponding to various land-uses, etc. Concerning the drainage module, water quality routing within pipes assumes that the conduit

  14. R.M. Solow Adjusted Model of Economic Growth

    Directory of Open Access Journals (Sweden)

    Ion Gh. Rosca

    2007-05-01

    Full Text Available Besides the models of M. Keynes, R.F. Harrod, E. Domar, D. Romer, Ramsey-Cass-Koopmans etc., the R.M. Solow model is part of the category which characterizes the economic growth. The paper proposes the study of the R.M. Solow adjusted model of economic growth, while the adjustment consisting in the model adaptation to the Romanian economic characteristics. The article is the first one from a three paper series dedicated to the macroeconomic modelling theme, using the R.M. Solow model, such as: “Measurement of the economic growth and extensions of the R.M. Solow adjusted model” and “Evolution scenarios at the Romanian economy level using the R.M. Solow adjusted model”. The analysis part of the model is based on the study of the equilibrium to the continuous case with some interpretations of the discreet one, by using the state diagram. The optimization problem at the economic level is also used; it is built up of a specified number of representative consumers and firms in order to reveal the interaction between these elements.

  15. Developing the Model for the GIS Applications in National Hydro-Meteorological Service in Poland

    Science.gov (United States)

    Kubacka, D.; Barszczynska, M.; Madej, P.

    2003-04-01

    Institute of Meteorology and Water Management (IMWM) manages the national hydrological-meteorological service, the task of which is to maintain the network of stations, process data, as well issue warnings, reports and announcements. There are 5 divisions of IMWM scattered all over Poland. Each division includes numerous stations and the scientific-research departments. The data gathered, processed and analysed in IMWM are space-related, therefore spatial information systems are indispensable for its processing and visualisation. The project of GIS application in (IMWM) will be discussed in the presentation. With the divisions being so dispersed, numerous and heterogeneous in structure, GIS implementation is very complicated. On the one hand GIS should enable advanced spatial analyses to be carried out by the research, as well as data processing departments. On the other hand, it should provide passive access to a limited scope of information (e.g. for outside customers). Need analysis was carried out first. It resulted in proposals concerning the content of shared resources of geometrical data and connections with attribute data, as well as in proposals of GIS use in routine works. A model was prepared using various types of GIS software depending on the requirements of each division. It is based on standard solutions involving professional GIS, desktop GIS and simple tools for data presentation. In some departments the specialised software had to be taken into account (e.g. satellite data processing). It is necessary to develop and implement dedicated research methods for some individual tasks. The analysis of mapping requirements showed that there is a need to prepare thematic maps at least at two levels of detail. Presently, the works are concentrated on assembling thematic layers for a general map (at 1: 500000 scale) sufficient for many applications, including data visualisation in the Internet and IMWM publications, as well as the tool for measurements and

  16. Operational and structural measures to reduce hydro-peaking impact on fish larvae

    International Nuclear Information System (INIS)

    Kopecki, Ianina; Schneider, Matthias

    2016-01-01

    Eco-hydraulic investigations studying the effects of hydro-peaking on river biota are gaining in importance. Negative effects of rapid flow fluctuations due to hydro power production are well documented by many studies, with the larvae and juvenile fish identified among the mostly affected life stages. Therefore, elaboration of efficient hydro-peaking mitigation strategies is an important issue for energy companies as well as for water body administrations responsible for the fulfilment of WFD requirements. The present case study strives for practical solutions allowing to minimize or compensate the negative effects of hydro-peaking on the fish fauna of the 7 km long river reach on the river Lech (southern Germany). Model based investigations allow to access the impact from currently authorized discharge regime, suggest operational and structural measures within the reach in terms of reducing the risk of stranding for fish larvae and select the measures most easy to implement and with the largest ecological benefit. The paper describes the approach for accessing the effects of hydro-peaking based on 2D hydrodynamic modelling, fuzzy logic based habitat modelling and information on cutting-edge biological investigations on fish larvae from Lunz experimental facility (Austria). (authors)

  17. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    International Nuclear Information System (INIS)

    Wiebe, P.A.

    1994-01-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs

  18. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, P.A

    1994-06-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs.

  19. A dissolution-diffusion sliding model for soft rock grains with hydro-mechanical effect

    Directory of Open Access Journals (Sweden)

    Z. Liu

    2018-06-01

    Full Text Available The deformation and failure of soft rock affected by hydro-mechanical (HM effect are one of the most concerns in geotechnical engineering, which are basically attributed to the grain sliding of soft rock. This study tried to develop a dissolution-diffusion sliding model for the typical red bed soft rock in South China. Based on hydration film, mineral dissolution and diffusion theory, and geochemical thermodynamics, a dissolution-diffusion sliding model with the HM effect was established to account for the sliding rate. Combined with the digital image processing technology, the relationship between the grain size of soft rock and the amplitude of sliding surface was presented. An equation for the strain rate of soft rocks under steady state was also derived. The reliability of the dissolution-diffusion sliding model was verified by triaxial creep tests on the soft rock with the HM coupling effect and by the relationship between the inversion average disjoining pressure and the average thickness of the hydration film. The results showed that the sliding rate of the soft rock grains was affected significantly by the waviness of sliding surface, the shear stress, and the average thickness of hydration film. The average grain size is essential for controlling the steady-state creep rate of soft rock. This study provides a new idea for investigating the deformation and failure of soft rock with the HM effect. Keywords: Soft rock, Hydro-mechanical (HM effect, Mineral dissolution-diffusion, Grain sliding model

  20. Development of HydroImage, A User Friendly Hydrogeophysical Characterization Software

    Energy Technology Data Exchange (ETDEWEB)

    Mok, Chin Man [GSI Environmental; Hubbard, Susan [Lawrence Berkeley National Laboratory; Chen, Jinsong [Lawrence Berkeley National Laboratory; Suribhatla, Raghu [AMEC E& I; Kaback, Dawn Samara [AMEC E& I

    2014-01-29

    HydroImage, user friendly software that utilizes high-resolution geophysical data for estimating hydrogeological parameters in subsurface strate, was developed under this grant. HydroImage runs on a personal computer platform to promote broad use by hydrogeologists to further understanding of subsurface processes that govern contaminant fate, transport, and remediation. The unique software provides estimates of hydrogeological properties over continuous volumes of the subsurface, whereas previous approaches only allow estimation of point locations. thus, this unique tool can be used to significantly enhance site conceptual models and improve design and operation of remediation systems. The HydroImage technical approach uses statistical models to integrate geophysical data with borehole geological data and hydrological measurements to produce hydrogeological parameter estimates as 2-D or 3-D images.

  1. Nuclear power at Ontario Hydro

    International Nuclear Information System (INIS)

    Tapon, F.; Osborne, T.J.

    1980-01-01

    This case study shows that the diffusion of nuclear power in the electric public utility industry in Canada approximates the logistic growth curve, in agreement with previous results on technological innovation diffusion in the U.S. private sector. Many of the economic variables that affect this diffusion in the private sectors in the U.S. and Canada are also significant in the public sector in Canada. Too few utilities have adopted nuclear technology to permit using regression analysis to study the effect of environmental and regulatory factors on the growth of Ontario Hydro. Thus, cost-benefit analysis for each province might be more effective

  2. Kinetic modelling of hydro-treatment reactions by study of different chemical groups; Modelisation cinetique des reactions d`hydrotraitement par regroupement en familles chimiques

    Energy Technology Data Exchange (ETDEWEB)

    Bonnardot, J

    1998-11-19

    Hydro-treatment of petroleum shortcuts permits elimination of unwanted components in order to increase combustion in engine and to decrease atmospheric pollution. Hydro-desulfurization (HDS), Hydro-denitrogenation (HDN) and Hydrogenation of aromatics (HDA) of a LCO (Light Cycle Oil)-Type gas oil have been studied using a new pilot at a fixed temperature with a NiMo/Al{sub 2}O{sub 3} catalyst. A hydrodynamic study showed that reactions occurring in the up-flow fixed bed reactor that has been used during the experiments, were governed exclusively by chemical reaction rates and not by diffusion. Through detailed chemical analysis, height chemical groups have been considered: three aromatics groups, one sulfided group, one nitrogenized and NH{sub 3}, H{sub 2}S, H{sub 2}. Two Langmuir-Hinshelwood-type kinetic models with either one or two types of sites have been established. The model with two types of site - one site of hydrogenation and one site of hydrogenolysis - showed a better fit in the modeling of the experimental results. This model enables to forecast the influence of partial pressure of H{sub 2}S and partial pressure of H{sub 2} on hydro-treatment reactions of a LCO-type gas oil. (author) 119 refs.

  3. Hydrologic Modeling at the National Water Center: Operational Implementation of the WRF-Hydro Model to support National Weather Service Hydrology

    Science.gov (United States)

    Cosgrove, B.; Gochis, D.; Clark, E. P.; Cui, Z.; Dugger, A. L.; Fall, G. M.; Feng, X.; Fresch, M. A.; Gourley, J. J.; Khan, S.; Kitzmiller, D.; Lee, H. S.; Liu, Y.; McCreight, J. L.; Newman, A. J.; Oubeidillah, A.; Pan, L.; Pham, C.; Salas, F.; Sampson, K. M.; Smith, M.; Sood, G.; Wood, A.; Yates, D. N.; Yu, W.; Zhang, Y.

    2015-12-01

    The National Weather Service (NWS) National Water Center(NWC) is collaborating with the NWS National Centers for Environmental Prediction (NCEP) and the National Center for Atmospheric Research (NCAR) to implement a first-of-its-kind operational instance of the Weather Research and Forecasting (WRF)-Hydro model over the Continental United States (CONUS) and contributing drainage areas on the NWS Weather and Climate Operational Supercomputing System (WCOSS) supercomputer. The system will provide seamless, high-resolution, continuously cycling forecasts of streamflow and other hydrologic outputs of value from both deterministic- and ensemble-type runs. WRF-Hydro will form the core of the NWC national water modeling strategy, supporting NWS hydrologic forecast operations along with emergency response and water management efforts of partner agencies. Input and output from the system will be comprehensively verified via the NWC Water Resource Evaluation Service. Hydrologic events occur on a wide range of temporal scales, from fast acting flash floods, to long-term flow events impacting water supply. In order to capture this range of events, the initial operational WRF-Hydro configuration will feature 1) hourly analysis runs, 2) short-and medium-range deterministic forecasts out to two day and ten day horizons and 3) long-range ensemble forecasts out to 30 days. All three of these configurations are underpinned by a 1km execution of the NoahMP land surface model, with channel routing taking place on 2.67 million NHDPlusV2 catchments covering the CONUS and contributing areas. Additionally, the short- and medium-range forecasts runs will feature surface and sub-surface routing on a 250m grid, while the hourly analyses will feature this same 250m routing in addition to nudging-based assimilation of US Geological Survey (USGS) streamflow observations. A limited number of major reservoirs will be configured within the model to begin to represent the first-order impacts of

  4. Fifteen years of radioactive waste management at Ontario Hydro

    International Nuclear Information System (INIS)

    Carter, T.J.; Rao, P.K.M.

    1985-01-01

    Ontario Hydro is a large Canadian utility producing 84% (7394 MWe) of the Nuclear Electricity generated in Canada. The low- and intermediate-level radioactive wastes generated by the Ontario Hydro program are currently being managed at the Bruce Nuclear Power Development with various volume reduction, packaging and interim storage systems. Ontario Hydro also owns and operates a radioactive waste transportation system. Studies are in progress for final disposal of these wastes in a suitable geology in Ontario. Since its inception in 1971, Ontario Hydro's radioactive waste management program has evolved into providing a full fledged radioactive waste management capability to the utility's two nuclear generation centres at Pickering and Bruce, and later in the decade, to Darlington. This paper summarizes the various developments in this program; highlights the major facilities both in-service and planned to be built; reviews the experiences gained over fifteen years of in-house waste management; and discusses the proposed reorientation towards ultimate disposal of these wastes. 2 refs., 8 figs., 1 tab

  5. Numerical modelling of hydro-morphological processes dominated by fine suspended sediment in a stormwater pond

    Science.gov (United States)

    Guan, Mingfu; Ahilan, Sangaralingam; Yu, Dapeng; Peng, Yong; Wright, Nigel

    2018-01-01

    Fine sediment plays crucial and multiple roles in the hydrological, ecological and geomorphological functioning of river systems. This study employs a two-dimensional (2D) numerical model to track the hydro-morphological processes dominated by fine suspended sediment, including the prediction of sediment concentration in flow bodies, and erosion and deposition caused by sediment transport. The model is governed by 2D full shallow water equations with which an advection-diffusion equation for fine sediment is coupled. Bed erosion and sedimentation are updated by a bed deformation model based on local sediment entrainment and settling flux in flow bodies. The model is initially validated with the three laboratory-scale experimental events where suspended load plays a dominant role. Satisfactory simulation results confirm the model's capability in capturing hydro-morphodynamic processes dominated by fine suspended sediment at laboratory-scale. Applications to sedimentation in a stormwater pond are conducted to develop the process-based understanding of fine sediment dynamics over a variety of flow conditions. Urban flows with 5-year, 30-year and 100-year return period and the extreme flood event in 2012 are simulated. The modelled results deliver a step change in understanding fine sediment dynamics in stormwater ponds. The model is capable of quantitatively simulating and qualitatively assessing the performance of a stormwater pond in managing urban water quantity and quality.

  6. A study on the hydrotreating of coal hydro liquefaction residue and its kinetics

    Energy Technology Data Exchange (ETDEWEB)

    Huang, J.; Lu, X.; Zhang, D.; Gao, J. [Department of Chemical Engineering for Energy Resources, East China University of Science and Technology, Shanghai (China)

    2010-09-15

    Hydro-conversion of coal hydro liquefaction residue obtained from a 6 t/day pilot plant of Shenhua Group in Shanghai was carried out under the hydrotreating condition. The coal hydro liquefaction residue and its product were extracted in sequence with n-hexane, toluene and tetrahydrofuran in a Soxhlet apparatus. The n-hexane soluble fractions increased with the increase of reaction temperature and time. Its amount increased from 14.14% to a maximum of 40.86% under the conditions of 470 {sup o}C and 30 min, which meant that moderate extension of coal residence time in the coal hydro liquefaction reactor is beneficial to the increase of oil yield. A 4-lumped kinetic model of coal hydro liquefaction residue hydro-conversion was performed using solubility-based lumped fractions. In the model, the tetrahydrofuran insoluble fractions were classified into two parts: easily reactive part and unreactive part. The kinetic parameters were estimated by a fourth-order Runge-Kutta method and a nonlinear least squares method, and the apparent activation energies were calculated according to the Arrhenius Equation. A large quantity of total catalyst consisting of remained liquefaction catalyst, part of the mineral from raw coal and additive Fe-based catalyst could considerably reduce the apparent activation energy of hydro-conversion for the toluene insoluble/tetrahydrofuran insoluble fractions to 36.79 kJ-mol{sup -1}. The calculated values of the model coincided well with the experimental values. (authors)

  7. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    International Nuclear Information System (INIS)

    Druce, D.

    2004-01-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs

  8. [Ontario Hydro]. Corporate performance report, 1994

    International Nuclear Information System (INIS)

    1995-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in 1993, beginning with overall results in such areas as customer service, environmental stewardship, human resources, and finance. This is followed by reports from the Generation Business Group, Customer Services Group, Corporate Business Group, General Counsel and Secretary, Ontario Hydro Audit, Strategic Planning, Environment and Communication Group, and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix includes summary financial statements

  9. Value versus Accuracy: application of seasonal forecasts to a hydro-economic optimization model for the Sudanese Blue Nile

    Science.gov (United States)

    Satti, S.; Zaitchik, B. F.; Siddiqui, S.; Badr, H. S.; Shukla, S.; Peters-Lidard, C. D.

    2015-12-01

    The unpredictable nature of precipitation within the East African (EA) region makes it one of the most vulnerable, food insecure regions in the world. There is a vital need for forecasts to inform decision makers, both local and regional, and to help formulate the region's climate change adaptation strategies. Here, we present a suite of different seasonal forecast models, both statistical and dynamical, for the EA region. Objective regionalization is performed for EA on the basis of interannual variability in precipitation in both observations and models. This regionalization is applied as the basis for calculating a number of standard skill scores to evaluate each model's forecast accuracy. A dynamically linked Land Surface Model (LSM) is then applied to determine forecasted flows, which drive the Sudanese Hydroeconomic Optimization Model (SHOM). SHOM combines hydrologic, agronomic and economic inputs to determine the optimal decisions that maximize economic benefits along the Sudanese Blue Nile. This modeling sequence is designed to derive the potential added value of information of each forecasting model to agriculture and hydropower management. A rank of each model's forecasting skill score along with its added value of information is analyzed in order compare the performance of each forecast. This research aims to improve understanding of how characteristics of accuracy, lead time, and uncertainty of seasonal forecasts influence their utility to water resources decision makers who utilize them.

  10. Theoretical and conditional monitoring of a small three-bladed vertical-axis micro-hydro turbine

    International Nuclear Information System (INIS)

    Huang, Sy-Ruen; Ma, Yen-Huai; Chen, Chia-Fu; Seki, Kazuichi; Aso, Toshiyuki

    2014-01-01

    Highlights: • This paper presents a novel 3 three-bladed vertical-axis micro-hydro turbine system. • This paper presents structure and performance of micro-hydroelectric turbine system. • The paper reveal that using VAMHT system in water is distinct from using in wind. • This paper present an experimental results of VAMHT system. • The paper show that the status transformation from cut-into stable power generation is short. - Abstract: This paper presents a novel 3-kW three-bladed vertical-axis micro-hydro turbine (VAMHT) system. The experimental results reveal that using this type of turbine in water is distinct from using it in wind. The micro-hydro turbine system uses a three-phase permanent magnet symmetric generator that transforms mechanical energy into electrical energy. The output voltage and frequency of the generator depend on water flow speed, and voltage steady equipment is used to maintain the maximum output power of the DC bus. According to the maximum power point tracking of the micro-hydro turbine system, the condition monitoring of the novel micro-hydro turbine requires no water flow meter. Furthermore, the construction and installation of the new micro-hydro turbine is simple, economical, and stable. This system combines a micro-hydro generator and electrical state-monitoring system, which can measure the speed, output power, DC-bus voltage, and all electrical characteristics of the micro-hydro turbine system. The results of comparing turbine between wind and water show that the speed ranges of water flow is narrower than that of wind, and the status transformation from cut-into stable power generation is short

  11. ONTOLOGICAL MODEL OF STRATEGIC ECONOMIC SECURITY OF ENTERPRISE

    Directory of Open Access Journals (Sweden)

    L. A. Zaporozhtseva

    2014-01-01

    Full Text Available Article explains the necessity the application of the ontological approach to modeling the strategic economic security in the formalization of the basic categories of domain company recognized its benefits. Among the advantages of the model distinguishes its versatility and ability to describe various aspects of strategic security - the system strategies and goals of the organization and business processes; possibility of its use at different levels of detail - from the top-level description of the basic categories of management, to design-level analytic applications; as well as the adaptability of the model, with depth on particular aspects determined by practical necessity and not regulated methodology. The model integrates various aspects of the concept of enterprise architecture and organizes conceptual apparatus. Ontological model easy to understand and adjust as business architects and specialists in designing systems of economic security and offers many categories of verbal representation of the domain of the enterprise. Proved the feasibility of using process-functional approach in providing strategic economic security, according to which the components of such a security company proposed as business processes, finance, staff and contractors. The article presents the author's ontological model of strategic economic security, including endangered sites, the presence of factors that threaten the security of the object and the subject of providing security. Further, it is proved that in the subjects of security impact on the object using the tools, measures and activities within the strategy formed the mechanism is implemented managerial decisions to strengthen the strategic economic security. The process of diagnosis, detection, identification of threats of economic security, and the development of enterprise development strategies, taking into account its level of economic security must be under the constant supervision of the process of

  12. Hydro-mechanical modelling of an excavation in an underground research laboratory with an elasto-viscoplastic behaviour law and regularization by second gradient of dilation

    International Nuclear Information System (INIS)

    Plassart, Roland; Giraud, Albert; Hoxha, Dashnor; Laigle, Francois

    2013-01-01

    In the context of nuclear waste disposals, this paper deals with hydro-mechanical modelling in saturated conditions in deep geological formation, using a specific elasto-viscoplastic model hereafter called the L and K model. While classical Biot's framework is followed for the hydro-mechanical coupling, the mechanical L and K model offers a coupling between instantaneous and delayed behaviour and a variation of dilation of ten related to softening. These volumetric strains are especially highlighted in coupled hydro-mechanical conditions. In order to avoid mesh dependency and numerical localized solutions, this type of modelling needs the use of a regularization method which is here referred to as the second gradient dilation model. After describing the numeric tools, we use them for simulating a gallery of the underground research laboratory of Bure. The approach is validated by the good general agreement found between numeric results and in situ measures for both hydraulic pressure and displacement. (authors)

  13. The Modeling of the Processes of Assessment and Analysis of the Level of Socio-Ecological-Economic Development of a Region

    Directory of Open Access Journals (Sweden)

    Pilko Andriy D.

    2017-06-01

    Full Text Available There presented results of the research of existing scientific and methodological, and theoretical approaches to management of the socio-ecological-economic development of a region with subsequent definition of priorities of the regional policy taking into account the concepts of security and development. Based on the study of literature sources and the analysis of the available statistical base, the problem of assessing the level of social, economic, ecological development, the level of sustainable development and the degree of harmonization of sustainable development of territorial systems of a region is formulated, and a possible method of its solution is suggested. The direction and nature of the cause-effect relationships between social tension and the levels of economic, environmental, social development and the level of sustainable development of a region are determined. There proposed a scheme to build models for assessing the effectiveness of levers for managing social, economic and environmental processes at the level of territorial systems in a region, taking into account the level of social tension and indicators of the investment component of development.

  14. The future role of hydro-electricity in Sub-Saharan Africa

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1989-01-01

    Hydroelectric power currently supplies 56-93% of the electricity requirements of the different geographic areas of Sub-Saharan Africa and accounted for 73% of total requirements in 1980. The continent is richly endowed with hydro resources in all areas, with central Africa possessing the most abundant reserves. Existing installed hydro capacity is 13,500 MW and of the total technical resource of 290,000 MW, some 110,000 MW are estimated to constitute the potential that warrants investigation. The demand for electricity in the region is presently low and growing at 5-10%/y. It is projected to double from 47,000 GWh in 1980 to 110,000-170,000 GWh by the year 2000, and is likely to double again by 2020. Hydro reserves warranting investigation exceed the demand projected for the year 2000 by a ratio of over 3:1 and only 13 countries out of 36 have a ratio less than one. A large proportion of these reserves are estimated to be economic to develop relative to other means of power generation. The development of hydro resources should maintain the proportion of the demand met by hydro in the range of 60-75% well into the 21st century. The existing installed capacity is likely to be increased at the rate of 3,000-5,000 MW per decade to achieve this. Constraints on such increase include the large amounts of capital needed, environmental issues, the need to displace populations affected by flooding, and fluctuations in the oil price which make long-term planning uncertain. 5 refs., 1 fig., 11 tabs

  15. Coupling Climate Models and Forward-Looking Economic Models

    Science.gov (United States)

    Judd, K.; Brock, W. A.

    2010-12-01

    Authors: Dr. Kenneth L. Judd, Hoover Institution, and Prof. William A. Brock, University of Wisconsin Current climate models range from General Circulation Models (GCM’s) with millions of degrees of freedom to models with few degrees of freedom. Simple Energy Balance Climate Models (EBCM’s) help us understand the dynamics of GCM’s. The same is true in economics with Computable General Equilibrium Models (CGE’s) where some models are infinite-dimensional multidimensional differential equations but some are simple models. Nordhaus (2007, 2010) couples a simple EBCM with a simple economic model. One- and two- dimensional ECBM’s do better at approximating damages across the globe and positive and negative feedbacks from anthroprogenic forcing (North etal. (1981), Wu and North (2007)). A proper coupling of climate and economic systems is crucial for arriving at effective policies. Brock and Xepapadeas (2010) have used Fourier/Legendre based expansions to study the shape of socially optimal carbon taxes over time at the planetary level in the face of damages caused by polar ice cap melt (as discussed by Oppenheimer, 2005) but in only a “one dimensional” EBCM. Economists have used orthogonal polynomial expansions to solve dynamic, forward-looking economic models (Judd, 1992, 1998). This presentation will couple EBCM climate models with basic forward-looking economic models, and examine the effectiveness and scaling properties of alternative solution methods. We will use a two dimensional EBCM model on the sphere (Wu and North, 2007) and a multicountry, multisector regional model of the economic system. Our aim will be to gain insights into intertemporal shape of the optimal carbon tax schedule, and its impact on global food production, as modeled by Golub and Hertel (2009). We will initially have limited computing resources and will need to focus on highly aggregated models. However, this will be more complex than existing models with forward

  16. Small hydro

    International Nuclear Information System (INIS)

    Bennett, K.; Tung, T.

    1995-01-01

    A small hydro plant in Canada is defined as any project between 1 MW and 15 MW but the international standard is 10 MW. The global market for small hydro development was considered good. There are some 1000 to 2000 MW of generating capacity being added each year. In Canada, growth potential is considered small, primarily in remote areas, but significant growth is anticipated in Eastern Europe, Africa and Asia. Canada with its expertise in engineering, manufacturing and development is considered to have a good chance to take advantage of these growing markets

  17. A 3D coupled hydro-mechanical granular model for the prediction of hot tearing formation

    International Nuclear Information System (INIS)

    Sistaninia, M; Drezet, J-M; Rappaz, M; Phillion, A B

    2012-01-01

    A new 3D coupled hydro-mechanical granular model that simulates hot tearing formation in metallic alloys is presented. The hydro-mechanical model consists of four separate 3D modules. (I) The Solidification Module (SM) is used for generating the initial solid-liquid geometry. Based on a Voronoi tessellation of randomly distributed nucleation centers, this module computes solidification within each polyhedron using a finite element based solute diffusion calculation for each element within the tessellation. (II) The Fluid Flow Module (FFM) calculates the solidification shrinkage and deformation-induced pressure drop within the intergranular liquid. (III) The Semi-solid Deformation Module (SDM) is used to simulate deformation of the granular structure via a combined finite element / discrete element method. In this module, deformation of the solid grains is modeled using an elasto-viscoplastic constitutive law. (IV) The Failure Module (FM) is used to simulate crack initiation and propagation with the fracture criterion estimated from the overpressure required to overcome the capillary forces at the liquid-gas interface. The FFM, SDM, and FM are coupled processes since solid deformation, intergranular flow, and crack initiation are deeply linked together. The granular model predictions have been validated against bulk data measured experimentally and calculated with averaging techniques.

  18. Low-level radwaste engineering economics

    International Nuclear Information System (INIS)

    Jacobs, M.H.; Miller, C.C.; Young, L.G.

    1984-07-01

    This topical report on engineering economics for low-level radwaste systems details the methodologies used for economic analyses of radwaste treatment systems and provides examples of radwaste economic evaluations. All of the parameters and cost items used in an evaluation are defined. Examples of the present-value-of-revenue-requirements method, levelized-revenue-requirements method, and the equivalent-capital-investment method are provided. Also, the calculation to determine the maximum justifiable capital expenditure for a radwaste system is illustrated. The report also provides examples of economic evaluations for many current radwaste treatment options. These options include evaporation versus demineralization, dewatering resins versus solidification of resins, and several volume reduction systems. 15 figures, 6 tables

  19. A parallel calibration utility for WRF-Hydro on high performance computers

    Science.gov (United States)

    Wang, J.; Wang, C.; Kotamarthi, V. R.

    2017-12-01

    A successful modeling of complex hydrological processes comprises establishing an integrated hydrological model which simulates the hydrological processes in each water regime, calibrates and validates the model performance based on observation data, and estimates the uncertainties from different sources especially those associated with parameters. Such a model system requires large computing resources and often have to be run on High Performance Computers (HPC). The recently developed WRF-Hydro modeling system provides a significant advancement in the capability to simulate regional water cycles more completely. The WRF-Hydro model has a large range of parameters such as those in the input table files — GENPARM.TBL, SOILPARM.TBL and CHANPARM.TBL — and several distributed scaling factors such as OVROUGHRTFAC. These parameters affect the behavior and outputs of the model and thus may need to be calibrated against the observations in order to obtain a good modeling performance. Having a parameter calibration tool specifically for automate calibration and uncertainty estimates of WRF-Hydro model can provide significant convenience for the modeling community. In this study, we developed a customized tool using the parallel version of the model-independent parameter estimation and uncertainty analysis tool, PEST, to enabled it to run on HPC with PBS and SLURM workload manager and job scheduler. We also developed a series of PEST input file templates that are specifically for WRF-Hydro model calibration and uncertainty analysis. Here we will present a flood case study occurred in April 2013 over Midwest. The sensitivity and uncertainties are analyzed using the customized PEST tool we developed.

  20. Small hydro plant- present scenario and future prospects

    International Nuclear Information System (INIS)

    Purohit, D.P.

    1996-01-01

    The article, deals with the methodology of power generation by small hydro power resources, especially in the Himalayan and sub Himalayan regions and the benefits it will bestow to the inhabitants of this region. The development of small hydro power projects in the Himalayas and sub Himalayas would serve as a model for environment- friendly sources of energy to benefit small communities world wide. The use of water turbine generators for the generation of cheaper power is also discussed. 4 refs

  1. A fuzzy stochastic framework for managing hydro-environmental and socio-economic interactions under uncertainty

    Science.gov (United States)

    Subagadis, Yohannes Hagos; Schütze, Niels; Grundmann, Jens

    2014-05-01

    An amplified interconnectedness between a hydro-environmental and socio-economic system brings about profound challenges of water management decision making. In this contribution, we present a fuzzy stochastic approach to solve a set of decision making problems, which involve hydrologically, environmentally, and socio-economically motivated criteria subjected to uncertainty and ambiguity. The proposed methodological framework combines objective and subjective criteria in a decision making procedure for obtaining an acceptable ranking in water resources management alternatives under different type of uncertainty (subjective/objective) and heterogeneous information (quantitative/qualitative) simultaneously. The first step of the proposed approach involves evaluating the performance of alternatives with respect to different types of criteria. The ratings of alternatives with respect to objective and subjective criteria are evaluated by simulation-based optimization and fuzzy linguistic quantifiers, respectively. Subjective and objective uncertainties related to the input information are handled through linking fuzziness and randomness together. Fuzzy decision making helps entail the linguistic uncertainty and a Monte Carlo simulation process is used to map stochastic uncertainty. With this framework, the overall performance of each alternative is calculated using an Order Weighted Averaging (OWA) aggregation operator accounting for decision makers' experience and opinions. Finally, ranking is achieved by conducting pair-wise comparison of management alternatives. This has been done on the basis of the risk defined by the probability of obtaining an acceptable ranking and mean difference in total performance for the pair of management alternatives. The proposed methodology is tested in a real-world hydrosystem, to find effective and robust intervention strategies for the management of a coastal aquifer system affected by saltwater intrusion due to excessive groundwater

  2. Linear Modeling and Regulation Quality Analysis for Hydro-Turbine Governing System with an Open Tailrace Channel

    OpenAIRE

    Jiandong Yang; Mingjiang Wang; Chao Wang; Wencheng Guo

    2015-01-01

    On the basis of the state–space method (SSM), a novel linear mathematical model of the unsteady flow for the tailrace system with an open channel is proposed. This novel model is an elastic linearized model of water hammer. The validity of the model has been verified by several examples of numerical simulation, which are based on a finite difference technique. Then, the complete mathematical model for the hydro-turbine governing system of hydropower station with an open tailrace channel, whi...

  3. Micro Hydro-Electric Energy Generation- An Overview

    OpenAIRE

    S. O. Anaza; M. S. Abdulazeez; Y. A. Yisah; Y. O. Yusuf; B. U. Salawu; S. U. Momoh

    2017-01-01

    Energy is required now more than ever due to population growth, industrialization and modernization. Challenges such as carbon dioxide (CO2) emissions and depletion of conventional source of energy necessitate for renewable sources, of which hydro energy seems to be the most predictable. Micro-hydro which is hydro energy in a “small” scale provides electricity to small communities by converting hydro energy into electrical energy. This paper is an overview of micro-hydro system by reviewing s...

  4. Mixed-integer nonlinear approach for the optimal scheduling of a head-dependent hydro chain

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-08-15

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We propose a novel mixed-integer nonlinear programming (MINLP) approach, considering hydroelectric power generation as a nonlinear function of water discharge and of the head. As a new contribution to earlier studies, we model the on-off behavior of the hydro plants using integer variables, in order to avoid water discharges at forbidden areas. Thus, an enhanced STHS is provided due to the more realistic modeling presented in this paper. Our approach has been applied successfully to solve a test case based on one of the Portuguese cascaded hydro systems with a negligible computational time requirement. (author)

  5. Challenging hydro-hegemony

    DEFF Research Database (Denmark)

    Wessels, Josepha Ivanka

    2015-01-01

    Bank. Both case studies show that control over water resources and supply provides political power over others at local level. Yet non-violent resistance can be observed in these border areas. In border areas between Israel, Syria and Palestine, control over access and water supply plays an important...... role in the ability of Israel to exercise hegemonic power in daily hydro-politics, which in the long term is detrimental for the people and the environment and disrupts the hydrological balance in the entire Jordan River basin....

  6. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Mariano, S.J.P.S. [Beira Interior Univ., Covilha (Portugal). Dept. of Electromechanical Engineering; Mendes, V.M.F. [Superior Engineering Inst. of Lisbon, Lisbon (Portugal). Dept. of Electrical Engineering and Automation; Ferreira, L.A.F.M. [Technical Univ. of Lisbon, Superior Technical Inst., Lisbon (Portugal). Dept. of Electrical Engineering and Computers

    2008-07-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs.

  7. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2008-01-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs

  8. Efficacy of Radiative Transfer Model Across Space, Time and Hydro-climates

    Science.gov (United States)

    Mohanty, B.; Neelam, M.

    2017-12-01

    The efficiency of radiative transfer model for better soil moisture retrievals is not yet clearly understood over natural systems with great variability and heterogeneity with respect to soil, land cover, topography, precipitation etc. However, this knowledge is important to direct and strategize future research direction and field campaigns. In this work, we present global sensitivity analysis (GSA) technique to study the influence of heterogeneity and uncertainties on radiative transfer model (RTM) and to quantify climate-soil-vegetation interactions. A framework is proposed to understand soil moisture mechanisms underlying these interactions, and influence of these interactions on soil moisture retrieval accuracy. Soil moisture dynamics is observed to play a key role in variability of these interactions, i.e., it enhances both mean and variance of soil-vegetation coupling. The analysis is conducted for different support scales (Point Scale, 800 m, 1.6 km, 3.2 km, 6.4 km, 12.8 km, and 36 km), seasonality (time), hydro-climates, aggregation (scaling) methods and across Level I and Level II ecoregions of contiguous USA (CONUS). For undisturbed natural environments such as SGP'97 (Oklahoma, USA) and SMEX04 (Arizona, USA), the sensitivity of TB to land surface variables remain nearly uniform and are not influenced by extent, support scales or averaging method. On the contrary, for anthropogenically-manipulated environments such as SMEX02 (Iowa, USA) and SMAPVEX12 (Winnipeg, Canada), the sensitivity to variables are highly influenced by the distribution of land surface heterogeneity and upscaling methods. The climate-soil-vegetation interactions analyzed across all ecoregions are presented through a probability distribution function (PDF). The intensity of these interactions are categorized accordingly to yield "hotspots", where the RTM model fails to retrieve soil moisture. A ecoregion specific scaling function is proposed for these hotspots to rectify RTM for

  9. Coupled Large Scale Hydro-mechanical Modelling for cap-rock Failure Risk Assessment of CO2 Storage in Deep Saline Aquifers

    International Nuclear Information System (INIS)

    Rohmer, J.; Seyedi, D.M.

    2010-01-01

    This work presents a numerical strategy of large scale hydro-mechanical simulations to assess the risk of damage in cap-rock formations during a CO 2 injection process. The proposed methodology is based on the development of a sequential coupling between a multiphase fluid flow (TOUGH2) and a hydro-mechanical calculation code (Code-Aster) that enables us to perform coupled hydro-mechanical simulation at a regional scale. The likelihood of different cap-rock damage mechanisms can then be evaluated based on the results of the coupled simulations. A scenario based approach is proposed to take into account the effect of the uncertainty of model parameters on damage likelihood. The developed methodology is applied for the cap-rock failure analysis of deep aquifer of the Dogger formation in the context of the Paris basin multilayered geological system as a demonstration example. The simulation is carried out at a regional scale (100 km) considering an industrial mass injection rate of CO 2 of 10 Mt/y. The assessment of the stress state after 10 years of injection is conducted through the developed sequential coupling. Two failure mechanisms have been taken into account, namely the tensile fracturing and the shear slip reactivation of pre-existing fractures. To deal with the large uncertainties due to sparse data on the layer formations, a scenario based strategy is undertaken. It consists in defining a first reference modelling scenario considering the mean values of the hydro-mechanical properties for each layer. A sensitivity analysis is then carried out and shows the importance of both the initial stress state and the reservoir hydraulic properties on the cap-rock failure tendency. On this basis, a second scenario denoted 'critical' is defined so that the most influential model parameters are taken in their worst configuration. None of these failure criteria is activated for the considered conditions. At a phenomenological level, this study points out three key

  10. Ideology and 'A' Level Economics Textbooks.

    Science.gov (United States)

    Webster, Angela

    1978-01-01

    Reviews economics textbooks frequently used in college level economics courses in England to determine the extent of bias. Topics analyzed include economics as science and ethics, profits, advertising, economic objectives, perfect competition, and nationalized industries. (Author/DB)

  11. An assessment of potential hydro-political tensions in transboundary river basins using environmental, political, and economic indicators

    Science.gov (United States)

    De Stefano, Lucia; Petersen-Perlman, Jacob; Sproles, Eric; Eynard, James; Wolf, Aaron T.

    2015-04-01

    Globally 286 river basins extend across international borders, covering over 61.9 million km2 of the earth's surface and hosting a total of approximately 2.7 billion people. In these basins, transboundary water resources support an interdependent web of environmental, political, and economic systems that can enhance or destabilize a region. We present an integrated global-scale assessment of transboundary watersheds to identify regions more likely to experience hydro-political tensions over the next decade and beyond based upon environmental, political, and economic indicators. We combine NASA's Gravity Recovery and Climate Experiment (GRACE) measurements of changes in terrestrial water storage with metrics of projected climate change impacts on water variability, the institutional capacity of countries to manage shared water resources, the development of new water infrastructure, per capita gross national income, domestic and international armed conflicts, and recent history of disputes over transboundary waters. The construction of new water-related infrastructure is on-going or planned in many basins worldwide. New water infrastructure is foreseen also in areas where instruments of international cooperation are still absent or limited in scope, e.g. in Southeast Asia, South Asia, Central America, the northern part of the South American continent, and the southern Balkans as well as in different parts of Africa. Moreover, in Central and Eastern Africa, the Middle East, and Central, South and South-East Asia there is a concomitance of several political, environmental and socioeconomic factors that could exacerbate hydropolitical tensions. Our analysis integrates political, economic and environmental metrics and is part of the United Nation's Transboundary Waters Assessment Programme to provide the first global-scale assessment of its type.

  12. Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China

    Directory of Open Access Journals (Sweden)

    Xinshuo Zhang

    2018-04-01

    Full Text Available How to effectively use clean renewable energy to improve the capacity of the power grid to absorb new energy and optimize the power grid structure has become one of China’s current issues. The Yalong River Wind-PV-Hydro complementary clean energy base was chosen as the research object from which to analyze the output complementarity principle and characteristics of wind farms, photovoltaic power plants, and hydropower stations. Then, an optimization scheduling model was established with the objective of minimizing the amount of abandoned wind and photovoltaic power and maximizing the stored energy in cascade hydropower stations. A Progress Optimality Algorithm (POA was used for the short-term optimal operation of Wind-PV-Hydro combinations. The results show that use of cascaded hydropower storage capacity can compensate for large-scale wind power and photovoltaic power, provide a relatively sustained and stable power supply for the grid. Wind-PV-Hydro complementary operation not only promotes wind power and photovoltaic power consumption but also improves the efficiency of using the original transmission channel of hydropower. This is of great significance to many developing countries in formatting a new green approach, realizing low-carbon power dispatch and trade and promoting regional economic development.

  13. Optimal scheduling for distributed hybrid system with pumped hydro storage

    International Nuclear Information System (INIS)

    Kusakana, Kanzumba

    2016-01-01

    Highlights: • Pumped hydro storage is proposed for isolated hybrid PV–Wind–Diesel systems. • Optimal control is developed to dispatch power flow economically. • A case study is conducted using the model for an isolated load. • Effects of seasons on the system’s optimal scheduling are examined through simulation. - Abstract: Photovoltaic and wind power generations are currently seen as sustainable options of in rural electrification, particularly in standalone applications. However the variable character of solar and wind resources as well as the variable load demand prevent these generation systems from being totally reliable without suitable energy storage system. Several research works have been conducted on the use of photovoltaic and wind systems in rural electrification; however most of these works have not considered other ways of storing energy except for conventional battery storage systems. In this paper, an energy dispatch model that satisfies the load demand, taking into account the intermittent nature of the solar and wind energy sources and variations in demand, is presented for a hybrid system consisting of a photovoltaic unit, a wind unit, a pumped hydro storage system and a diesel generator. The main purpose of the developed model is to minimize the hybrid system’s operation cost while optimizing the system’s power flow considering the different component’s operational constraints. The simulations have been performed using “fmincon” implemented in Matlab. The model have been applied to two test examples; the simulation results are analyzed and compared to the case where the diesel generator is used alone to supply the given load demand. The results show that using the developed control model for the proposed hybrid system, fuel saving can be achieved compared to the case where the diesel is used alone to supply the same load patters.

  14. Agent-based modeling in ecological economics.

    Science.gov (United States)

    Heckbert, Scott; Baynes, Tim; Reeson, Andrew

    2010-01-01

    Interconnected social and environmental systems are the domain of ecological economics, and models can be used to explore feedbacks and adaptations inherent in these systems. Agent-based modeling (ABM) represents autonomous entities, each with dynamic behavior and heterogeneous characteristics. Agents interact with each other and their environment, resulting in emergent outcomes at the macroscale that can be used to quantitatively analyze complex systems. ABM is contributing to research questions in ecological economics in the areas of natural resource management and land-use change, urban systems modeling, market dynamics, changes in consumer attitudes, innovation, and diffusion of technology and management practices, commons dilemmas and self-governance, and psychological aspects to human decision making and behavior change. Frontiers for ABM research in ecological economics involve advancing the empirical calibration and validation of models through mixed methods, including surveys, interviews, participatory modeling, and, notably, experimental economics to test specific decision-making hypotheses. Linking ABM with other modeling techniques at the level of emergent properties will further advance efforts to understand dynamics of social-environmental systems.

  15. The Nothuesli small hydro project; Wasserkraftwerk Nothuesli, Gonzenbaechli - Vorprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Balachandran, S.; Jorde, K.

    2008-07-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  16. An approach to the investment analysis of small and medium hydro-power plants

    DEFF Research Database (Denmark)

    Forouzbakhsh, Farshid; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Sincea large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments,however it is possible...

  17. Comparison of hydro-environmental impacts for ebb-only and two-way generation for a Severn Barrage

    Science.gov (United States)

    Ahmadian, Reza; Falconer, Roger A.; Bockelmann-Evans, Bettina

    2014-10-01

    Marine renewable energy is playing an increasing significant role in many parts of the world, mainly due to a rise in the awareness of climate change, and its detrimental effects, and the increasing cost of natural resources. The Severn Estuary, located between South West England and South Wales, has a tidal range of up to 14 m which makes it the second highest tidal range in the world. There are a number of barrage proposals amongst various marine renewable energy schemes proposed to be built in the estuary. The Cardiff-Weston STPG (Severn Tidal Power Group) Barrage, which would be one of the world's largest tidal renewable energy schemes if built, is one of the most publicised schemes to-date. This barrage would generate about 17 TWh/annum of power, which is approximately 5% of the UK's electricity consumption, whilst causing significant hydro-environmental and ecological impact on the estuary. This study mainly focuses on investigating the hydro-environmental impacts of the STPG barrage for the option of two-way generation, and compares this with the commonly investigated option of ebb-only generation. The impacts of the barrage were modelled by implementing a linked 1-D/2-D hydro-environmental model, with the capability of modelling several key environmental processes. The model predictions show that the hydro-environmental impacts of the barrage on the Severn Estuary and Bristol Channel, such as changes in the maximum velocity and reduction in suspended sediment and bacteria levels, were less significant for the two-way generation scheme when compared with the corresponding impacts for ebb-only generation.

  18. Hydro-abrasive erosion of hydraulic turbines caused by sediment - a century of research and development

    Science.gov (United States)

    Felix, D.; Albayrak, I.; Abgottspon, A.; Boes, R. M.

    2016-11-01

    Hydro-abrasive erosion of hydraulic turbines is an economically important issue due to maintenance costs and production losses, in particular at high- and medium-head run-of- river hydropower plants (HPPs) on sediment laden rivers. In this paper, research and development in this field over the last century are reviewed. Facilities for sediment exclusion, typically sand traps, as well as turbine design and materials have been improved considerably. Since the 1980s, hard-coatings have been applied on Francis and Pelton turbine parts of erosion-prone HPPs and became state-of-the-art. These measures have led to increased times between overhauls and smaller efficiency reductions. Analytical, laboratory and field investigations have contributed to a better processes understanding and quantification of sediment-related effects on turbines. More recently, progress has been made in numerical modelling of turbine erosion. To calibrate, validate and further develop prediction models, more measurements from both physical model tests in laboratories and real-scale data from HPPs are required. Significant improvements to mitigate hydro-abrasive erosion have been achieved so far and development is ongoing. A good collaboration between turbine manufacturers, HPP operators, measuring equipment suppliers, engineering consultants, and research institutes is required. This contributes to the energy- and cost-efficient use of the worldwide hydropower potential.

  19. Market Power in Hydro-Thermal Supply

    International Nuclear Information System (INIS)

    Edin, Karl-Axel

    2006-12-01

    Despite having had a deregulated electricity market in Sweden for over ten years we still need to increase our understanding as to how deregulated electricity markets actually work and how possible problems are to be solved. One question that is always in focus is if the competition between generators in the Nordic electricity market really works the way it was intended. Many argue that the concentration in ownership of generation plants already has gone too far. Together with joint ownership in nuclear facilities and barriers for entrance, critics say that this has resulted in higher electricity prices than necessary. In this report different methods to (ex ante) study potential possibilities for generating firms to influence the electricity price (market power) and (ex post) discover possible manipulation through analysing the spot price and other observed factors on the electricity market are analysed. The purpose of the longer underlying paper is to give a comprehensive treatment of the electricity market with storage, i.e. hydro power, with an auction market organisation and to test the models on the Nordic market in order to explore the explanatory power of auction market theory and the theory of contestable market. The main theoretical effort in the paper concerns auction theory with inventories. The paper develops an inter-temporal auction model of a thermal-hydro power market. Parallel to the derivation of the basic equations a numerical model is developed in order to illustrate the results of the model. Section 2 of the present paper summarizes the basic equations (derived in the longer paper) for an inter-temporal auction thermal-hydro market. Section 3 contains the illustrations of solutions to equations for some stylized markets. In section 4 the auction model is tested on the Nordic market

  20. Commercial-Industrial Cleaning, by Pressure-Washing, Hydro-Blasting and UHP-Jetting The Business Operating Model and How-To Manual for 450 Specific Applications

    CERN Document Server

    Maasberg, Wolfgang

    2012-01-01

    Commercial-Industrial Cleaning, by Pressure-Washing, Hydro-Blasting and UHP-Jetting is the first proprietary manual for cleaning and rehabilitation through pressure-washing, hydro-blasting and ultra high pressure water jetting (UHP).   It examines the cleaning, restoration and rehabilitation of statuary and historical structures; manufacturing hardware; and application technologies for residential, commercial and industrial areas, structures and buildings. Commercial-Industrial Cleaning, by Pressure-Washing, Hydro-Blasting and UHP-Jetting contains over 450 applications from agricultural, marine, municipal, food processing, paper-pulp, pharmaceutical and cosmetic, industrial and power generating maintenance areas. It includes gear lists to help readers easily identify the appropriate tooling and equipment for each specific application and industry.   Commercial-Industrial Cleaning, by Pressure-Washing, Hydro-Blasting and UHP-Jetting supplies readers with the tools to create a successful business model for re...

  1. Analysis and modeling of coupled thermo-hydro-mechanical phenomena in 3D fractured media

    International Nuclear Information System (INIS)

    Canamon Valera, I.

    2006-11-01

    This doctoral research was conducted as part of a joint France-Spain co-tutelage PhD thesis in the framework of a bilateral agreement between two universities, the Institut National Polytechnique de Toulouse (INPT) and the Universidad Politecnica de Madrid (UPM). It concerns a problem of common interest at the national and international levels, namely, the disposal of radioactive waste in deep geological repositories. The present work is devoted, more precisely, to near-field hydrogeological aspects involving mass and heat transport phenomena. The first part of the work is devoted to a specific data interpretation problem (pressures, relative humidities, temperatures) in a multi-barrier experimental system at the scale of a few meters - the 'Mock-Up Test' of the FEBEX project, conducted in Spain. Over 500 time series are characterized in terms of spatial, temporal, and/or frequency/scale-based statistical analysis techniques. The time evolution and coupling of physical phenomena during the experiment are analyzed, and conclusions are drawn concerning the behavior and reliability of the sensors. The second part of the thesis develops in more detail the 3-Dimensional (3D) modeling of coupled Thermo-Hydro-Mechanical phenomena in a fractured porous rock, this time at the scale of a hundred meters, based on the data of the 'In-Situ Test' of the FEBEX project conducted at the Grimsel Test Site in the Swiss Alps. As a first step, a reconstruction of the 3D fracture network is obtained by Monte Carlo simulation, taking into account through optimization the geomorphological data collected around the FEBEX gallery. The heterogeneous distribution of traces observed on the cylindrical wall of the tunnel is fairly well reproduced in the simulated network. In a second step, we develop a method to estimate the equivalent permeability of a many-fractured block by extending the superposition method of Ababou et al. [1994] to the case where the permeability of the rock matrix is not

  2. A Rock Mechanics and Coupled Hydro mechanical Analysis of Geological Repository of High Level Nuclear Waste in Fractured Rocks

    International Nuclear Information System (INIS)

    Min, Kibok

    2011-01-01

    This paper introduces a few case studies on fractured hard rock based on geological data from Sweden, Korea is one of a few countries where crystalline rock is the most promising rock formation as a candidate site of geological repository of high level nuclear waste. Despite the progress made in the area of rock mechanics and coupled hydro mechanics, extensive site specific study on multiple candidate sites is essential in order to choose the optimal site. For many countries concerned about the safe isolation of nuclear wastes from the biosphere, disposal in a deep geological formation is considered an attractive option. In geological repository, thermal loading continuously disturbs the repository system in addition to disturbances a recent development in rock mechanics and coupled hydro mechanical study using DFN(Discrete Fracture Network) - DEM(Discrete Element Method) approach mainly applied in hard, crystalline rock containing numerous fracture which are main sources of deformation and groundwater flow

  3. Comparative modelling of laboratory experiments for the hydro-mechanical behaviour of a compacted bentonite–sand\

    Czech Academy of Sciences Publication Activity Database

    Millard, A.; Mokni, N.; Barnichon, J. D.; Tatcher, K. E.; Bond, A.; Mc Dermott, C.; Blaheta, Radim; Michalec, Zdeněk; Hasal, Martin; Nguyen, T. S.; Nasir, O.; Fedors, S.; Yi, H.; Kolditz, O.

    2016-01-01

    Roč. 75, č. 20 (2016), s. 1311-1327 ISSN 1866-6280. [DECOVALEX 2015 /8./. Wakkanai, 13.10.2015-16.10.2015] Institutional support: RVO:68145535 Keywords : hydro-mechanical (hm) coupling * numerical modelling * sealing system s * compacted bentonite–sand mixture Subject RIV: DB - Geology ; Mineralogy Impact factor: 1.569, year: 2016 http://link.springer.com/article/10.1007/s12665-016-6118-z

  4. The Effect of 8 Weeks of Aerobic Training and Consumption of Hydro-alcoholic Extract of Nettle on Apelin and hs-CRP plasma Levels of Overweight and Obese Women

    Directory of Open Access Journals (Sweden)

    M Madadi Jaberi

    2016-12-01

    Full Text Available Background and aim: The use of exercise along with herbal supplements is one method proposed for controlling obesity and its complications. The aim of this study was to investigate the effect of 8 weeks aerobic training and use of hydro-alcoholic extract of nettle on levels apelin and hs-CRP plasma in overweight and obese women. Methods: The present quasi-experimental study was conducted with blind randomized clinical trial. 46 overweight and obese women (body mass index greater than 25 kilograms per square millimeter two, aged 25-45 years were selected purposefully and randomly divided into four groups of: aerobic training + hydro alcoholic extract of nettle, aerobic exercise + placebo extract of nettle and placebo. The intervention group and placebo received 8 mg of hydro alcoholic extract of nettle 8 ml of water-soluble daily for 8 weeks respectively. Aerobic exercise ergometer for 8 weeks, 3 sessions of 16 to 30 minutes with the intensity of 60-75% heart rate was reserved. In two pre and post-test after 14 hours of fasting at the same conditions, blood samples were collected. The ELISA method was use to assess levels of plasma apelin and hs-CRP d. Data obtained were analyzed using the Kolmogorov-Smirnov test, ANOVA, t-test and LSD test. Results: The results showed that the levels of hs-CRP were significantly different in comparison among the groups as well as in groups of aerobic exercise + hydro alcoholic extract of nettle, nettle and hydro-alcholic aerobic exercise + placebo significant reduction was observed (p>0.05. Conclusion: It seems that consumption of Nettle extract along with aerobic exercise through Weight loss, body fat percentage and BMI, play an effective role in control of obesity and reducing of inflammatory Apelin markers and hs-CRP in obese women

  5. Nuclear generation cost management and economic benefits

    International Nuclear Information System (INIS)

    Horton, E.P.; Sepa, T.R.

    1989-01-01

    The CANDU-Pressurized Heavy Water (CANDU-PHW) type of nuclear generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report discusses the cost management principles used for Ontario Hydro's CANDU-PHW program, current cost management initiatives, and the economic benefits of nuclear power to the provinces of Ontario and New Brunswick, in Canada

  6. BC hydro: Annual report, 1991-1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The third largest electric utility in Canada, B.C. Hydro services almost 1.3 million customers in an area containing over 92 per cent of British Columbia's population. B.C. Hydro's mission is to generate, transmit and distribute electricity. This annual report covers the business and financial performance of B.C. Hydro, and financial statistics.

  7. Studying Economic Space: Synthesis of Balance and Game-Theoretic Methods of Modelling

    Directory of Open Access Journals (Sweden)

    Natalia Gennadyevna Zakharchenko

    2015-12-01

    Full Text Available The article introduces questions about development of models used to study economic space. The author proposes the model that combines balance and game-theoretic methods for estimating system effects of economic agents’ interactions in multi-level economic space. The model is applied to research interactions between economic agents that are spatially heterogeneous within the Russian Far East. In the model the economic space of region is considered in a territorial dimension (the first level of decomposing space and also in territorial and product dimensions (the second level of decomposing space. The paper shows the mechanism of system effects formation that exists in the economic space of region. The author estimates system effects, analyses the real allocation of these effects between economic agents and identifies three types of local industrial markets: with zero, positive and negative system effects

  8. Economic analysis model for total energy and economic systems

    International Nuclear Information System (INIS)

    Shoji, Katsuhiko; Yasukawa, Shigeru; Sato, Osamu

    1980-09-01

    This report describes framing an economic analysis model developed as a tool of total energy systems. To prospect and analyze future energy systems, it is important to analyze the relation between energy system and economic structure. We prepared an economic analysis model which was suited for this purpose. Our model marks that we can analyze in more detail energy related matters than other economic ones, and can forecast long-term economic progress rather than short-term economic fluctuation. From view point of economics, our model is longterm multi-sectoral economic analysis model of open Leontief type. Our model gave us appropriate results for fitting test and forecasting estimation. (author)

  9. Optimal wind-hydro solution for the Marmara region of Turkey to meet electricity demand

    International Nuclear Information System (INIS)

    Dursun, Bahtiyar; Alboyaci, Bora; Gokcol, Cihan

    2011-01-01

    Wind power technology is now a reliable electricity production system. It presents an economically attractive solution for the continuously increasing energy demand of the Marmara region located in Turkey. However, the stochastic behavior of wind speed in the Marmara region can lead to significant disharmony between wind energy production and electricity demand. Therefore, to overcome wind's variable nature, a more reliable solution would be to integrate hydropower with wind energy. In this study, a methodology to estimate an optimal wind-hydro solution is developed and it is subsequently applied to six typical different site cases in the Marmara region in order to define the most beneficial configuration of the wind-hydro system. All numerical calculations are based on the long-term wind speed measurements, electrical load demand and operational characteristics of the system components. -- Research highlights: → This study is the first application of a wind-hydro pumped storage system in Turkey. → The methodology developed in this study is applied to the six sites in the Marmara region of Turkey. A wind - hydro pumped storage system is proposed to meet the electric energy demand of the Marmara region.

  10. Thermo-hydro-mechanical processes in the nearfield around a HLW repository in argillaceous formations. Vol. II. In-situ-investigations and interpretative modelling. May 2007 to May 2013

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Chun-Liang; Czaikowski, Oliver; Komischke, Michael; Wieczorek, Klaus

    2014-06-15

    Deep disposal of heat-emitting high-level radioactive waste (HLW) in clay formations will inevitably induce thermo-hydro-mechanical-chemical disturbances to the host rock and engineered barriers over very long periods of time. The responses and resulting property changes of the natural and engineered barriers are to be well understood, characterized, and predicted for assessing the long-term performance and safety of the repositories. In accordance with the R and D programme defined by the German Federal Ministry of Economics and Technology (BMWi), GRS has intensively performed site-independent research work on argillaceous rocks during the last decade. Most of the investigations have been carried out on the Callovo-Oxfordian argillite and the Opalinus clay by par-ticipation in international research projects conducted at the underground research laboratories at Bure in France (MHM-URL) and Mont-Terri in Switzerland (MT-URL). The THM-TON project, which was funded by BMWi under contract number 02E10377, in-vestigated the THM behaviours of the clay host rock and clay-based backfill/sealing materials with laboratory tests, in situ experiments and numerical modelling.

  11. A spatially explicit hydro-ecological modeling framework (BEPS-TerrainLab V2.0): Model description and test in a boreal ecosystem in Eastern North America

    Science.gov (United States)

    Govind, Ajit; Chen, Jing Ming; Margolis, Hank; Ju, Weimin; Sonnentag, Oliver; Giasson, Marc-André

    2009-04-01

    SummaryA spatially explicit, process-based hydro-ecological model, BEPS-TerrainLab V2.0, was developed to improve the representation of ecophysiological, hydro-ecological and biogeochemical processes of boreal ecosystems in a tightly coupled manner. Several processes unique to boreal ecosystems were implemented including the sub-surface lateral water fluxes, stratification of vegetation into distinct layers for explicit ecophysiological representation, inclusion of novel spatial upscaling strategies and biogeochemical processes. To account for preferential water fluxes common in humid boreal ecosystems, a novel scheme was introduced based on laboratory analyses. Leaf-scale ecophysiological processes were upscaled to canopy-scale by explicitly considering leaf physiological conditions as affected by light and water stress. The modified model was tested with 2 years of continuous measurements taken at the Eastern Old Black Spruce Site of the Fluxnet-Canada Research Network located in a humid boreal watershed in eastern Canada. Comparison of the simulated and measured ET, water-table depth (WTD), volumetric soil water content (VSWC) and gross primary productivity (GPP) revealed that BEPS-TerrainLab V2.0 simulates hydro-ecological processes with reasonable accuracy. The model was able to explain 83% of the ET, 92% of the GPP variability and 72% of the WTD dynamics. The model suggests that in humid ecosystems such as eastern North American boreal watersheds, topographically driven sub-surface baseflow is the main mechanism of soil water partitioning which significantly affects the local-scale hydrological conditions.

  12. Sensitivity analysis of a coupled hydro-mechanical paleo-climate model of density-dependent groundwater flow in discretely fractured crystalline rock

    International Nuclear Information System (INIS)

    Normani, S.D.; Sykes, J.F.

    2011-01-01

    A high resolution three-dimensional sub-regional scale (104 km 2 ) density-dependent, discretely fractured groundwater flow model with hydro-mechanical coupling and pseudo-permafrost was developed from a larger 5734 km 2 regional-scale groundwater flow model of a Canadian Shield setting. The objective of the work is to determine the sensitivity of modelled groundwater system evolution to the hydro-mechanical parameters. The discrete fracture dual continuum numerical model FRAC3DVS-OPG was used for all simulations. A discrete fracture network model delineated from surface features was superimposed onto an approximate 790 000 element domain mesh with approximately 850 000 nodes. Orthogonal fracture faces (between adjacent finite element grid blocks) were used to best represent the irregular discrete fracture zone network. Interconnectivity of the permeable fracture zones is an important pathway for the possible migration and subsequent reduction in groundwater and contaminant residence times. The crystalline rock matrix between these structural discontinuities was assigned mechanical and flow properties characteristic of those reported for the Canadian Shield. The variation of total dissolved solids with depth was assigned using literature data for the Canadian Shield. Performance measures for the sensitivity analysis include equivalent freshwater heads, environmental heads, linear velocities, and depth of penetration by conservative non-decaying tracers released at the surface. A 121 000 year North American continental scale paleo-climate simulation was applied to the domain with ice-sheet histories estimated by the University of Toronto Glacial Systems Model (UofT GSM). Hydro-mechanical coupling between the rock matrix and the pore fluid, due to the ice sheet normal stress, was included in the simulations. The flow model included the influence of vertical strain and assumed that areal loads were homogeneous. Permafrost depth was applied as a permeability reduction

  13. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D. [British Columbia Hydro, Vancouver, BC (Canada)

    2004-07-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs.

  14. Efficiency of economic development models

    Directory of Open Access Journals (Sweden)

    Oana Camelia Iacob

    2013-03-01

    Full Text Available The world economy is becoming increasingly integrated. Integrating emerging economies of Asia, such as China and India increase competition on the world stage, putting pressure on the "actors" already existing. These developments have raised questions about the effectiveness of European development model, which focuses on a high level of equity, insurance and social protection. According to analysts, the world today faces three models of economic development with significant weight in the world: the European, American and Asian. This study will focus on analyzing European development model, and a brief comparison with the United States. In addition, this study aims to highlight the relationship between efficiency and social equity that occurs in each submodel in part of the European model, given that social and economic performance in the EU are not homogeneous. To achieve this, it is necessary to analyze different indicators related to social equity and efficiency respectively, to observe the performance of each submodel individually. The article analyzes data to determine submodel performance according to social equity and economic efficiency.

  15. A GIS-Based Model for the analysis of an urban flash flood and its hydro-geomorphic response. The Valencia event of 1957

    Science.gov (United States)

    Portugués-Mollá, I.; Bonache-Felici, X.; Mateu-Bellés, J. F.; Marco-Segura, J. B.

    2016-10-01

    Flash floods are recurrent events around the Mediterranean region. Extreme episodes activate hydro-geomorphic high-intensity processes with low frequency. In urban environments, the complexity becomes higher due to the existence of very quick-response runoff. However, immediate recovery works remove the urban marks. After a short time both the significance and magnitude of the hydro-geomorphic event become completely unrecognizable. Nevertheless, these episodes generate extensive documentation which is testimony of the processes in almost real time. It is necessary to exploit this source typology in order to draw flood sketches when events far in time may lack a sufficiently rich database. This is particularly the case for the Valencia flash flood (October 1957), located in the lower Turia River basin (Eastern Spain). It left numerous pieces of hydro-geomorphic evidence, but its tracks were covered a short while after the flood. In any case, it remains part of a non-systematic legacy that has not yet been exploited, consisting of immediate aerial and oblique high resolution photography, pictures at street level, water marks and administrative records. Paradoxically, despite being considered a milestone in metropolitan territorial planning (the river was definitely diverted), an accurate reconstruction of the hydraulic behaviour was required from an integrated point of view. To this aim, the development of a GIS-Based Model enabled the utilisation of the above-mentioned materials. This non-conventional information was treated jointly from a new perspective. It provided database support through a vast amount of organised, structured and georeferenced information about the 1957 event. In a second stage, the GBM made it possible to characterise the Turia urban reach and interpret both the hydro-geomorphic (trenches along barrier beaches, erosion, deposition, etc.) and hydraulic (urban streams along the streets, flow directions, flood extent, levees breaks, overflows

  16. 77 FR 77070 - Black Bear Hydro Partners, LLC;

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2727-086] Black Bear Hydro...: October 24, 2012. d. Submitted By: Black Bear Hydro Partners, LLC (Black Bear Hydro). e. Name of Project... designating Black Bear Hydro as the Commission's non-federal representative for carrying out informal...

  17. Hydro and After: The Canadian Experience with the Organization, Nationalization and Deregulation of Electrical Utilities

    International Nuclear Information System (INIS)

    Nelles, Henry Vivian

    2003-01-01

    This paper surveys the process of nationalization and some recent steps towards denationalization in a distinctive Canadian institutional setting, the provincial hydro-electric power utilities. The richest, most industrialized central province, Ontario, established a dynamic publicly owned electric generation and distribution system before World War I. Most other provinces developed variations of the regulatory model to govern private monopolies until the post World War II period when widespread nationalization at the provincial level created a near universal pattern of state owned electric companies. Recently, the process of dismantling state monopolies in this sector has begun in two provinces, one where public ownership was weakest, and the other where the concept of 'provincial hydro' was born

  18. Econometric modelling of economic security in business operations management

    OpenAIRE

    Chagovets, L. О.; Nevezhin, V. P.; Zakharova, О. V.

    2014-01-01

    The article deals with econometric modeling of economic security. The model of evaluating transaction costs effect on the level of enterprise economic security is provided. The econometric models of evaluating economic security that are used in research are based on panel data. According to the results, the reserves for increasing the general level of economic security due to transaction costs reduction are revealed. Розглянуто питання економетричного моделювання економічної безпеки. Предс...

  19. New markets for small-scale hydro

    International Nuclear Information System (INIS)

    Maurer, E.A.

    1997-01-01

    The market for small and medium sized hydro-electric power plant is more attractive than ever. The boom in Europe has increasingly spread to the emerging countries, and here too small hydro plays an important ecological role. In addition to new plant rehabilitation of 'historical' plant is now a major factor. The last few years have seen a market shift from single machine components to complete plant and systems, requiring a strategy re-think on the part of larger companies. Following the influx of private capital into the power industry, business conditions have also undergone a thorough transformation. In place of 'fast money', hydro power offers the prospect of earning longer-term, sustainable money'. The term small-scale hydro-electric power (or simply 'small hydro') is used slightly differently depending on the country and market. Here, it is used to denote plant with turbines up to 10 MW. (Author)

  20. Surface-near geothermal power. Handling of hydro-economic requirements in the practice; Oberflaechennahe Geothermie. Umgang mit den wasserwirtschaftlichen Anforderungen in der Praxis

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-12-15

    Within the meeting of the Bavarian Environment Agency (Augsburg, Federal Republic of Germany) at 1st December, 2009, the following lectures were held: (1) Hydro-economical requirements and working assistance of the Bavarian Environment Agency (Hannes Berger); (2) Technology, dimensioning and safety devices for heat pumps and heat source plants soil - groundwater (Erich Ramming); (3) Well devices for the thermal utilization of the groundwater - planning, production and quality assurance (Michael Thoren); (4) Geothermal probes: Handling of raw materials and welding at the building site (Hubert Graf); (5) Geothermal probes - planning and calculation (Burkhard Sanner); (6) Geothermal probes - drilling operations (Sven Tewes); (7) Certification of drilling companies according to W 120 (Udo Peth); (8) Operation of geothermal plants - Examples from one-family house to football stadium (Arno Poehlmann).

  1. [Ontario Hydro]. Corporate performance report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values established in the approved corporate financial plan and work program budget. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in mid-1993, beginning with overall results in such areas as customer satisfaction, electricity sales, human resources, and environmental protection. This is followed by reports from the Electricity Group (supply, generation, transmission), the Energy Services and Environment Group (load saved and shifted, non-utility generation, retail distribution), and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix contains summary financial statements

  2. Mitigation of negative ecological and socio-economic impacts of the Diama dam on the Senegal River Delta wetland (Mauritania), using a model based decision support system

    Science.gov (United States)

    Duvail, S.; Hamerlynck, O.

    construction of the Diama dam in 1986 and the floodplain and estuarine areas on the Mauritanian bank were affected severely by the absence of floods. In 1994, managed flood releases were initiated in the Bell basin (4000 ha) of the Diawling National Park, as part of a rehabilitation effort. The basin was designated as a joint management area between traditional users and the Park authority and a revised management plan was developed through a participatory approach based on a topographical, hydro-climatic, ecological and socio-economic data. Hydraulic modelling was developed as a tool to support stakeholder negotiations on the desired characteristics of the managed flood releases. Initially, a water balance model was developed. The data were then integrated into a one-dimensional hydraulic model, MIKE 11 (DHI, 2000). When associated with a Digital Elevation Model and a Geographic Information System, (Arc View), the model provided a dynamic description of floods. Flood extent, water depth and flood duration data were combined with ecological and socio-economic data. The water requirements of the different stakeholders were converted to flood scenarios and the benefits and constraints analysed. A consensus scenario was reached through a participatory process. The volume of flood release required to restore the delta does not affect hydro-power generation, navigation or intensive irrigation, for which the dams in the basin were constructed. Hydraulic modelling provided useful inputs to stakeholder discussions and allows investigation of untested flood scenarios.

  3. The development of small-hydro in China; Le developpement de la petite hydraulique en Chine

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, X. [United Nations Environment Programme, Riso (Denmark); Pan, J. [Chinese Academy of Social Sciences (China). Research Centre for Economic Development

    2007-04-15

    Small hydro is a renewable source of energy that is economically and technically viable. This article described China's investment in small-scale hydroelectric power plants in 1,600 remote communities. Seventy per cent of China's small hydro power stations are concentrated in remote impoverished communities. These power stations provide electricity to 300 million people in China, where half of the territories, one third of the districts and towns, and one quarter of the population depend primarily on this energy source for their electricity needs. The first power station was built in the province of Yunnan in 1912, but the real development of small hydro occurred after 1950, and can be divided into three phases. Phase 1 occurred before 1980 when small hydro power stations concentrated on providing electricity for lighting in rural areas as well as for transforming agriculture and irrigation. For many decades following the foundation of the Republic of China, rural areas did not have access to electricity or had serious shortages of electricity. In order to ensure electricity in isolated and remote areas, the Chinese government requested that local authorities build and exploit small hydro where conditions were favourable, and this while respecting water resources. Phase 2 occurred between 1980s and 1990s, with a focus on improving the performance of small hydro power stations to include electricity provisions for local enterprises. During phase 2, small hydro became a tool for dynamic rural development for farmers to increase their revenues. The latest phase in small hydro development has also helped reduce poverty and develop local economies, but in addition, it plays a role in the long term protection of ecosystems, the environment and rural modernization. Today 660,000 people work for small power stations and most are employed locally. Replacing firewood with electricity has saved 130,000 hectares of forested land and helped protect ecosystems. Small

  4. Sustainability Challenge of Micro Hydro Power Development in Indonesia

    Science.gov (United States)

    Didik, H.; Bambang, P. N.; Asep, S.; Purwanto, Y. A.

    2018-05-01

    Rural electrification using renewable energy is the best choice for many locations that far away from national grid. Many renewable energy project have been built for rural electrification such as micro hydro power plant (MHPP) and solar photovoltaic (SPV). Sustainability still the main challenge of off-grid renewable energy development for off-grid rural electrification in Indonesia. The objective of this paper is to review sustainability of micro hydro power development in Indonesia. The research method was done by field observation, interview with MHPP management, and reviewing some research about MHPP in Indonesia. Sustainability issues include various aspects that can be classified into 5 dimensions: technical, economic, socio-cultural, institutional, and environmental. In technical factors that lead to sustainability problem are: improper MHPP design and construction, improper operation and maintenance, availability of spare parts and expertise. In the economic dimension are generally related to: low electricity tariff and utilization of MHPP for productive use. In the social dimension are: the growth of consumer’s load exceeding the capacity, reduced number of consumers, lack of external institutional support. In the institutional side, it is generally related to the ability of human resources in managing, operating and maintaining of MHPP. Environmental factors that lead the sustainability problems of MHPP are: scarcity of water discharge, conflict of water resources, land conversion over the watershed, and natural disasters.

  5. Objective thermo-hydro-mechanical modelling of the damaged zone around a radioactive waste storage site

    International Nuclear Information System (INIS)

    Marinelli, Ferdinando

    2013-01-01

    We present two different approaches to describe the hydro-mechanical behaviour of geo-materials. In the first approach the porous media is studied through an equivalent continuum media where the interaction between the fluid and solid phases characterize the coupling behaviour at the macro-scale. We take into account this approach to model experimental tests performed over a hollow cylinder sample of clay rock (Boom Clay), considered for nuclear waste storage. The experimental results clearly show that the mechanical behaviour of the material is strongly anisotropic. For this reason we chose an elasto-plastic model based on Drucker-Prager criterion where the elastic part is characterized by cross anisotropy. The numerical results of boundary value problem clearly show localised strains around the inner hollow section. In order to regularize the numerical problem we consider a second gradient local continuum media with an enriched kinematic where an internal length can be introduced making the results mesh independent. The uniqueness study is carried out showing that changing the temporal discretization of the problem leads to different solutions. In the second approach we study the hydro-mechanical behaviour of a porous media that it is characterised by the microstructure of the material. The microstructure taken into account is composed by elastic grains, cohesive interfaces and a network of fluid channels. Using a periodic media a numerical homogenization (square finite element method) is considered to compute mass flux, stress and density of the mixture. In this way a pure numerical constitutive law is built from the microstructure of the media. This method has been implemented into a finite element code (Lagamine, Universite de Liege) to obtain results at the macro-scale. A validation of this implementation is performed for a pure mechanical boundary value problem and for a hydro-mechanical one. (author)

  6. Standardized CSR and climate performance: why is Shell willing, but Hydro reluctant?; Shell; Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Boasson, Elin Lerum; Wettestad, Joergen

    2007-06-15

    This report aims to contribute to the ongoing discussion concerning whether CSR merely serves to streamline company rhetoric or also has an influence on actual efforts. We discuss the tangible effects of CSR instruments on the climate-related rules and performances of the two different oil companies Hydro and Shell. First we explore whether similar CSR instruments lead to similar climate-related rules and practices in the two companies. Both Hydro and Shell adhere to the Global Compact (GC), the Global Reporting Initiative (GRI), the Carbon Disclosure Project (CDP) and the Global Gas Flaring Reduction Public-Private Partnership (GGFR). The report concludes that the GC has not rendered any tangible effects in either of the companies. Concerning the other instruments, Hydro has only followed the instrument requirements that fit their initial approach, and refrained from all deviating requirements. Shell has been more malleable, but we have noted few effects on the actual emissions and business portfolio resulting from the instrument adherence. Second, we assess how the differing results of the similar CSR portfolio may be explained. The reluctant attitude of the leaders in Hydro and the strong CSR motivation of Shell's executives result in significant differences. Hydro executives are able to constrain the effects of the instrument adherence. With Shell we note the opposite pattern: Its leaders promoted the instruments to be translated into internal rules, but a general lack of hierarchical structures hinders them from governing the conduct of various sub-organisations. The very diversity of the Shell culture helps to explain why the efforts of its executives have resulted in limited impact. The strength of the Hydro culture makes the corporation resistant to the instruments. Moreover, Hydro is strikingly shielded by virtue of its strong position in Norway. In contrast, Shell is more strongly affected by the global field of petroleum and the global field of CSR

  7. Hydro-energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Bacher, P. [Electricite de France (EDF), 75 - Paris (France); Tardieu, B. [Coyne et Bellier, 92 - Gennevilliers (France)

    2005-07-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  8. Evaluation of HFIR vessel surveillance data and hydro-test conditions

    International Nuclear Information System (INIS)

    Cheverton, R.D.; Nanstad, R.K.

    1994-01-01

    Surveillance specimens for the High Flux Isotope Reactor (HFIR) pressure vessel were removed and tested during 1993, after the vessel had accumulated 701,469 MWd of operation. The data agree well with HFIR surveillance data obtained in previous years. In conjunction with this effort, the vessel hydro-test conditions were reevaluated and found to be more than adequate. In view of this result, and because there are economic incentives for reducing the frequency of hydro testing, an analysis was performed to determine the minimum permissible frequency. The value obtained is substantially less than that presently specified. It was also determined that a somewhat lower cooling-tower-basin temperature is acceptable (improves operational flexibility). In 1986, after ∼20 years of reactor operation, it was discovered that the vessel embrittlement rate was substantially greater than expected. Possible reasons for the accelerated rate are reviewed in this report

  9. Analysis of the reactivity of sulphur compounds in petroleum cuts: kinetics and modelling of hydro-treating; Analyse de la reactivite des composes soufres dans les coupes petrolieres: cinetique et modelisation de l'hydrotraitement

    Energy Technology Data Exchange (ETDEWEB)

    Lopez Garcia, C

    2000-12-01

    The study of the hydro-treating of middle distillates comprised the following steps: - Identification and reactivity study of the sulphur compounds present in these petroleum cuts; - Modelling of the process by a chemical kinetic approach. The hydro-treating of middle distillates is a refining process that allows elimination of organic compounds containing sulphur, nitrogen, oxygen and metals. The process also hydrogenates the aromatic compounds providing improved cetane index gas-oils while respecting the regulations that severely limit the content of sulphur compounds. The extension and the improvement of a kinetic model for the hydro-treating of LCO gas-oils (light cycle oil gas-oils) are presented in this work. In order to improve the hydro-desulfurization model predictions, a detailed identification of the sulphur compounds contained in LCO gas-oils was carried out using gas chromatography with a sulphur chemiluminescence detector (GC-SCD). The most refractory sulphur compounds (alkyl-di-benzothiophenes) were identified and lumped into different families. Based on a lumped reaction scheme with a Langmuir-Hinshelwood representation, the model takes into account the influence of temperature, total pressure and hydrogen sulphide partial pressure on the reaction rates for hydro-desulfurization, hydro-denitrogenation and hydro-de-aromatization. The model parameter estimation was based on experiments that were carried out on a micro-pilot unit using an industrial sulfided NiMo/Al{sub 2}O{sub 3} catalyst and LCO feedstocks. The analytical study of the sulphur compounds was also extended to the case of straight run gas-oils (SR). For these feedstocks, a method using high-resolution mass spectrometry coupled with gas chromatography (GC-HRMS) was developed. In this way, the kinetic model can now be extended for the SR gas-oil hydro-treating or for LCO-SR mixtures. (author)

  10. A Full Hydro- and Morphodynamic Description of Breaker Bar Development

    DEFF Research Database (Denmark)

    Jacobsen, Niels Gjøl

    The present thesis considers a coupled modelling approach for hydro- and morphodynamics in the surf zone, which is based on a solution to the Reynolds Averaged Navier-Stokes (RANS) equations with a Volume of Fluid (VOF) closure for the surf tracking. The basis for the numerical approach is the su......The present thesis considers a coupled modelling approach for hydro- and morphodynamics in the surf zone, which is based on a solution to the Reynolds Averaged Navier-Stokes (RANS) equations with a Volume of Fluid (VOF) closure for the surf tracking. The basis for the numerical approach...

  11. Bio-economic modelling to assess the impact of water pricing policies at the farm level in the Oum Zessar watershed, southern Tunisia

    NARCIS (Netherlands)

    Jeder, H.; Sghaier, M.; Louhchi, P.; Reidsma, P.

    2014-01-01

    For integrated assessment at farm level, the Farm System SIMulator model (FSSIM) was used. FSSIM is a bio-economic model developed for the European context, and was adapted and tested for Tunisian conditions to assess, ex-ante, impacts of water pricing policies at the farm level to the year 2015.

  12. An Agent-Based Dynamic Model of Politics, Fertility and Economic Development

    Directory of Open Access Journals (Sweden)

    Zining Yang

    2016-08-01

    Full Text Available In the political economy of development, government policy choices at a single point in time can dramatically affect a country's development path by impacting fertility, economic and political decisions across generations. Combining system dynamics and agent-based modeling approaches in a complex adaptive system, a simulation framework of the Politics of Fertility and Economic Development (POFED is formalized to understand the relationship between politics, economic, and demography change at both macro and micro levels. First, a new political capacity measurement is used; and the system dynamics model is validated with the latest data. Second, the endogenous attributes are fused with non-cooperative game theory in an agent-based framework to simulate the interactive political economic dynamics of individual intra-societal transactions. Finally, macro and micro levels are connected with policy levers of political capacity and political instability by merging system dynamics and agent-based components. This paper also explores the agent-based model's behavioral dynamics via simulation methods to identify paths towards economic development and political stability. This model demonstrates micro level human agency can act, react and interact, thus driving macro level dynamics, while macro structures provide political, social and economic environments that constrain or incentivize micro level human behavior.

  13. Stakeholder perceptions of water systems and hydro-climate information in Guanacaste, Costa Rica

    Directory of Open Access Journals (Sweden)

    Matthew Babcock

    2016-07-01

    Full Text Available Abstract In the face of changing environmental and socio-economic drivers, access to, understanding of, and the use of probabilistic climate forecasts and other sources of scientific hydro-climate information are important for informed decision making in the water sector. This paper characterizes and compares local perceptions of the water system and hydro-climate information in the seasonally dry province of Guanacaste, Costa Rica. Semi-structured interviews were conducted with a total of 40 participants from 7 water-related groups. Interview results were used to compare mental models of the drivers of water systems and water scarcity mitigation/adaptation options, and relate them to stakeholder information needs, accuracy ratings, and use. Our results suggest that: 1 while there appear to be similar perceptions of the drivers of rainfall and groundwater, there is a gap between groups in the use of forecasts, the awareness of management options, and the level of detailed understanding of how the water system works; 2 there are potential mismatches between the information presented in rainfall forecasts and the stated and/or salient information needs of some stakeholders, specifically in the case of groundwater resources; 3 there appear to be different perceptions of forecasts even among groups that rate the accuracy of such forecasts the same; and 4 there appears to be a relationship between the use of forecasts and certain types of management actions such as long-term planning. Our findings warrant further investigation and confirmation and may contribute to the development of communications that help stakeholders make informed decisions about freshwater management in semi-arid regions.

  14. Training and Research on Probabilistic Hydro-Thermo-Mechanical Modeling of Carbon Dioxide Geological Sequestration in Fractured Porous Rocks

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, Marte

    2013-05-31

    Colorado School of Mines conducted research and training in the development and validation of an advanced CO{sub 2} GS (Geological Sequestration) probabilistic simulation and risk assessment model. CO{sub 2} GS simulation and risk assessment is used to develop advanced numerical simulation models of the subsurface to forecast CO2 behavior and transport; optimize site operational practices; ensure site safety; and refine site monitoring, verification, and accounting efforts. As simulation models are refined with new data, the uncertainty surrounding the identified risks decrease, thereby providing more accurate risk assessment. The models considered the full coupling of multiple physical processes (geomechanical and fluid flow) and describe the effects of stochastic hydro-mechanical (H-M) parameters on the modeling of CO{sub 2} flow and transport in fractured porous rocks. Graduate students were involved in the development and validation of the model that can be used to predict the fate, movement, and storage of CO{sub 2} in subsurface formations, and to evaluate the risk of potential leakage to the atmosphere and underground aquifers. The main major contributions from the project include the development of: 1) an improved procedure to rigorously couple the simulations of hydro-thermomechanical (H-M) processes involved in CO{sub 2} GS; 2) models for the hydro-mechanical behavior of fractured porous rocks with random fracture patterns; and 3) probabilistic methods to account for the effects of stochastic fluid flow and geomechanical properties on flow, transport, storage and leakage associated with CO{sub 2} GS. The research project provided the means to educate and train graduate students in the science and technology of CO{sub 2} GS, with a focus on geologic storage. Specifically, the training included the investigation of an advanced CO{sub 2} GS simulation and risk assessment model that can be used to predict the fate, movement, and storage of CO{sub 2} in

  15. User experience with HydroHelp programs

    Energy Technology Data Exchange (ETDEWEB)

    Verner, J.S. [Brookfield Power, Gatineau, PQ (Canada)

    2009-07-01

    Advances in the field of geographical information systems (GIS) have simplified the process of finding suitable sites for new hydroelectric projects. However, estimating the construction cost remains a challenge. The HydroHelp program is a cost evaluation program developed specifically to determine if a project will be economically feasible. The program is made up of 4 programs, depending on the type of turbine suitable for the site. Once a turbine selection is made, users can choose the program according to Kaplan, Impulse or Francis turbines. Users must rely on GIS, since the program requires a thorough understanding of the site geology and topography. Knowledge of hydroelectric plants is also necessary in order to obtain a credible construction cost. This paper demonstrated the capacity and flexibility of the software along with its different functions and available options. A detailed cost breakdown can be obtained along with an energy estimate and project specifications. In addition, the software can be used to optimize the project through different options by changing the facility's layout in terms of the type of dam, spillway, conduit length and diameter, turbine type and flood level. 17 figs.

  16. Modeling the Impacts of Urbanization and Industrial Transformation on Water Resources in China: An Integrated Hydro-Economic CGE Analysis

    Directory of Open Access Journals (Sweden)

    Li Jiang

    2014-10-01

    Full Text Available Pressure on existing water resources in China is expected to increase with undergoing rapid demographic transformation, economic development, and global climate changes. We investigate the economy-wide impacts of projected urban population growth and economic structural change on water use and allocation in China. Using a multi-regional CGE (Computable General Equilibrium model, TERM (The Enormous Regional Model, we explore the implications of selected future water scenarios for China’s nine watershed regions. Our results indicate that urbanization and industrial transformation in China will raise the opportunity cost of water use and increase the competition for water between non-agricultural users and irrigation water users. The growth in water demand for domestic and industrial uses reduces the amount of water allocated to agriculture, particularly lower-value and water-intensive field crops. As a response, farmers have the incentive to shift their agricultural operations from traditional field crop production to higher-value livestock or intensive crop production. In addition, our results suggest that growing water demand due to urbanization and industrial transformation will raise the shadow price of water in all nine river basins. Finally, we find that national economic growth is largely attributable to urbanization and non-agricultural productivity growth.

  17. Dynamic Floodplain representation in hydrologic flood forecasting using WRF-Hydro modeling framework

    Science.gov (United States)

    Gangodagamage, C.; Li, Z.; Maitaria, K.; Islam, M.; Ito, T.; Dhondia, J.

    2016-12-01

    Floods claim more lives and damage more property than any other category of natural disaster in the Continental United States. A system that can demarcate local flood boundaries dynamically could help flood prone communities prepare for and even prevent from catastrophic flood events. Lateral distance from the centerline of the river to the right and left floodplains for the water levels coming out of the models at each grid location have not been properly integrated with the national hydrography dataset (NHDPlus). The NHDPlus dataset represents the stream network with feature classes such as rivers, tributaries, canals, lakes, ponds, dams, coastlines, and stream gages. The NHDPlus dataset consists of approximately 2.7 million river reaches defining how surface water drains to the ocean. These river reaches have upstream and downstream nodes and basic parameters such as flow direction, drainage area, reach slope etc. We modified an existing algorithm (Gangodagamage et al., 2007) to provide lateral distance from the centerline of the river to the right and left floodplains for the flows simulated by models. Previous work produced floodplain boundaries for static river stages (i.e. 3D metric: distance along the main stem, flow depth, lateral distance from river center line). Our new approach introduces the floodplain boundary for variable water levels at each reach with the fourth dimension, time. We use modeled flows from WRF-Hydro and demarcate the right and left lateral boundaries of inundation dynamically by appropriately mapping discharges into hydraulically corrected stages. Backwater effects from the mainstem to tributaries are considered and proper corrections are applied for the tributary inundations. We obtained river stages by optimizing reach level channel parameters using newly developed stream flow routing algorithm. Non uniform inundations are mapped at each NHDplus reach (upstream and downstream nodes) and spatial interpolation is carried out on a

  18. The use of hydro-dynamic models in the practice-oriented education of engineering students

    Science.gov (United States)

    Sziebert, J.; Zellei, L.; Tamás, E. A.

    2009-04-01

    Management tasks related to open channel flows became rather comprehensive and multi-disciplinary, particularly with the predominancy of nature management aspects. The water regime of our rivers has proven to reach extremities more and more frequently in the past decades. In order to develop and analyse alternative solutions and to handle and resolve conflicts of interests, we apply 1D hydro-dynamic models in education for the explanation of processes and to improve practical skills of our students.

  19. Maximizing Energy Savings Reliability in BC Hydro Industrial Demand-side Management Programs: An Assessment of Performance Incentive Models

    Science.gov (United States)

    Gosman, Nathaniel

    For energy utilities faced with expanded jurisdictional energy efficiency requirements and pursuing demand-side management (DSM) incentive programs in the large industrial sector, performance incentive programs can be an effective means to maximize the reliability of planned energy savings. Performance incentive programs balance the objectives of high participation rates with persistent energy savings by: (1) providing financial incentives and resources to minimize constraints to investment in energy efficiency, and (2) requiring that incentive payments be dependent on measured energy savings over time. As BC Hydro increases its DSM initiatives to meet the Clean Energy Act objective to reduce at least 66 per cent of new electricity demand with DSM by 2020, the utility is faced with a higher level of DSM risk, or uncertainties that impact the costeffective acquisition of planned energy savings. For industrial DSM incentive programs, DSM risk can be broken down into project development and project performance risks. Development risk represents the project ramp-up phase and is the risk that planned energy savings do not materialize due to low customer response to program incentives. Performance risk represents the operational phase and is the risk that planned energy savings do not persist over the effective measure life. DSM project development and performance risks are, in turn, a result of industrial economic, technological and organizational conditions, or DSM risk factors. In the BC large industrial sector, and characteristic of large industrial sectors in general, these DSM risk factors include: (1) capital constraints to investment in energy efficiency, (2) commodity price volatility, (3) limited internal staffing resources to deploy towards energy efficiency, (4) variable load, process-based energy saving potential, and (5) a lack of organizational awareness of an operation's energy efficiency over time (energy performance). This research assessed the capacity

  20. Dynamics analysis of the fast-slow hydro-turbine governing system with different time-scale coupling

    Science.gov (United States)

    Zhang, Hao; Chen, Diyi; Wu, Changzhi; Wang, Xiangyu

    2018-01-01

    Multi-time scales modeling of hydro-turbine governing system is crucial in precise modeling of hydropower plant and provides support for the stability analysis of the system. Considering the inertia and response time of the hydraulic servo system, the hydro-turbine governing system is transformed into the fast-slow hydro-turbine governing system. The effects of the time-scale on the dynamical behavior of the system are analyzed and the fast-slow dynamical behaviors of the system are investigated with different time-scale. Furthermore, the theoretical analysis of the stable regions is presented. The influences of the time-scale on the stable region are analyzed by simulation. The simulation results prove the correctness of the theoretical analysis. More importantly, the methods and results of this paper provide a perspective to multi-time scales modeling of hydro-turbine governing system and contribute to the optimization analysis and control of the system.

  1. Concept of economic readiness levels assessment

    Science.gov (United States)

    Yuniaristanto, Sutopo, W.; Widiyanto, A.; Putri, A. S.

    2017-11-01

    This research aims to build a concept of Economic Readiness Level (ERL) assessment for incubation center. ERL concept is arranged by considering both market and business aspects. Every aspect is divided into four phases and each of them consists of some indicators. Analytic Hierarchy Process (AHP) is used to develop the ERL in calculating the weight of every single aspect and indicator. Interval scale between 0 and 4 is also applied in indicator assessment. In order to calculate ERL, score in every indicator and the weight of both the aspect and indicator are considered. ERL value is able to show in detail the innovative product readiness level from economic sight, market and business aspect. There are four levels in Economic Readiness Level scheme which are investigation, feasibility, planning and introduction.

  2. Combined Economic and Hydrologic Modeling to Support Collaborative Decision Making Processes

    Science.gov (United States)

    Sheer, D. P.

    2008-12-01

    For more than a decade, the core concept of the author's efforts in support of collaborative decision making has been a combination of hydrologic simulation and multi-objective optimization. The modeling has generally been used to support collaborative decision making processes. The OASIS model developed by HydroLogics Inc. solves a multi-objective optimization at each time step using a mixed integer linear program (MILP). The MILP can be configured to include any user defined objective, including but not limited too economic objectives. For example, an estimated marginal value for water for crops and M&I use were included in the objective function to drive trades in a model of the lower Rio Grande. The formulation of the MILP, constraints and objectives, in any time step is conditional: it changes based on the value of state variables and dynamic external forcing functions, such as rainfall, hydrology, market prices, arrival of migratory fish, water temperature, etc. It therefore acts as a dynamic short term multi-objective economic optimization for each time step. MILP is capable of solving a general problem that includes a very realistic representation of the physical system characteristics in addition to the normal multi-objective optimization objectives and constraints included in economic models. In all of these models, the short term objective function is a surrogate for achieving long term multi-objective results. The long term performance for any alternative (especially including operating strategies) is evaluated by simulation. An operating rule is the combination of conditions, parameters, constraints and objectives used to determine the formulation of the short term optimization in each time step. Heuristic wrappers for the simulation program have been developed improve the parameters of an operating rule, and are initiating research on a wrapper that will allow us to employ a genetic algorithm to improve the form of the rule (conditions, constraints

  3. Macro-economic environmental models

    International Nuclear Information System (INIS)

    Wier, M.

    1993-01-01

    In the present report, an introduction to macro-economic environmental models is given. The role of the models as a tool for policy analysis is discussed. Future applications, as well as the limitations given by the data, are brought into focus. The economic-ecological system is described. A set of guidelines for implementation of the system in a traditional economic macro-model is proposed. The characteristics of empirical national and international environmental macro-economic models so far are highlighted. Special attention is paid to main economic causalities and their consequences for the environmental policy recommendations sat by the models. (au) (41 refs.)

  4. Hydro-abrasive erosion on coated Pelton runners: Partial calibration of the IEC model based on measurements in HPP Fieschertal

    Science.gov (United States)

    Felix, D.; Abgottspon, A.; Albayrak, I.; Boes, R. M.

    2016-11-01

    At medium- and high-head hydropower plants (HPPs) on sediment-laden rivers, hydro-abrasive erosion on hydraulic turbines is a major economic issue. For optimization of such HPPs, there is an interest in equations to predict erosion depths. Such a semi-empirical equation suitable for engineering practice is proposed in the relevant guideline of the International Electrotechnical Commission (IEC 62364). However, for Pelton turbines no numerical values of the model's calibration parameters have been available yet. In the scope of a research project at the high-head HPP Fieschertal, Switzerland, the particle load and the erosion on the buckets of two hard-coated 32 MW-Pelton runners have been measured since 2012. Based on three years of field data, the numerical values of a group of calibration parameters of the IEC erosion model were determined for five application cases: (i) reduction of splitter height, (ii) increase of splitter width and (iii) increase of cut-out depth due to erosion of mainly base material, as well as erosion of coating on (iv) the splitter crests and (v) inside the buckets. Further laboratory and field investigations are recommended to quantify the effects of individual parameters as well as to improve, generalize and validate erosion models for uncoated and coated Pelton turbines.

  5. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  6. Interaction between daily load demand curve and management of hydro-thermal generation system

    International Nuclear Information System (INIS)

    Granelli, G.; Montagna, M.; Pasini, G.; Innorta, M.; Marannino, P.

    1993-01-01

    The influence that the behaviour of the daily load demand curve has on the management of a hydro-thermal generation system is considered. The aim of this paper is to show the improvements that can be achieved by suitable load management techniques capable of flattening the load demand curve. The analysis is carried out by using a hydro-thermal scheduling program and a thermal unit dynamic dispatch procedure. The possibility of properly re-committing the available thermal units is also taken into account. The economical and technical convenience of shutting down less economical thermal units operating near the lower generations limits is verified. Finally, some considerations are made about the possible use of the thermal generation incremental costs as a tool for planning the end users' kWh prices, even in the short term. The results refer to a system with characteristics similar to those of the Italian one. In determining the daily load demand curves, the characteristics of load demand in Italy as well as in other European countries are taken into account

  7. Modelling the interaction between flooding events and economic growth

    Science.gov (United States)

    Grames, Johanna; Grass, Dieter; Prskawetz, Alexia; Blöschl, Günther

    2015-04-01

    Socio-hydrology describes the interaction between the socio-economy, water and population dynamics. Recent models analyze the interplay of community risk-coping culture, flooding damage and economic growth (Di Baldassarre, 2013, Viglione, 2014). These models descriptively explain the feedbacks between socio-economic development and natural disasters like floods. Contrary to these descriptive models, our approach develops an optimization model, where the intertemporal decision of an economic agent interacts with the hydrological system. This is the first economic growth model describing the interaction between the consumption and investment decisions of an economic agent and the occurrence of flooding events: Investments in defense capital can avoid floods even when the water level is high, but on the other hand such investment competes with investment in productive capital and hence may reduce the level of consumption. When floods occur, the flood damage therefore depends on the existing defense capital. The aim is to find an optimal tradeoff between investments in productive versus defense capital such as to optimize the stream of consumption in the long-term. We assume a non-autonomous exogenous periodic rainfall function (Yevjevich et.al. 1990, Zakaria 2001) which implies that the long-term equilibrium will be periodic . With our model we aim to derive mechanisms that allow consumption smoothing in the long term, and at the same time allow for optimal investment in flood defense to maximize economic output. We choose an aggregate welfare function that depends on the consumption level of the society as the objective function. I.e. we assume a social planer with perfect foresight that maximizes the aggregate welfare function. Within our model framework we can also study whether the path and level of defense capital (that protects people from floods) is related to the time preference rate of the social planner. Our model also allows to investigate how the frequency

  8. Determination of installation capacity in reservoir hydro-power plants considering technical, economical and reliability indices

    DEFF Research Database (Denmark)

    Hosseini, S.M.H.; Forouzbakhsh, Farshid; Fotouh-Firuzabad, Mahmood

    2008-01-01

    One of the most important issues in planning the ‘‘reservoir” type of hydro-power plants (HPP) is to determine the installation capacity of the HPPs and estimate its annual energy value. In this paper, a method is presented. A computer program has been developed to analyze energy calculation...

  9. Hydro-Quebec annual report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    An overview is presented of the activities of Hydro-Quebec for the year ended December 31, 1993, as well as its financial status. Export sales of electricity to other Canadian provinces and the USA are reported. Research programs and demonstration projects are described, as well as the utility's international activities. Environmental and economic considerations for the province are presented. Financial data includes total sales, sales by sector, export sales, and rate changes. A financial statement is included. In 1993, total sales volume was 152.1 TWh, or 7.5 TWh more than in 1992, for a total sales revenue of $7,004 million, an increase of 3.5% over 1992. Sales in Quebec increased 5 TWh, with nearly all of this increase coming from the industrial sector. Exports outside of Quebec totalled 15 TWh, or 20% more than in 1992. The largest increase in exports was in the form of short-term sales to the USA. Expenditures in 1993 were $3,761 million, only slightly more than in 1992. Facilities commissioned in 1993 included the Brisay power plant, two of six units at the Laforge-1 plant, and the north portion of the 12th transmission line from the LaGrande complex. Total installed capacity of the Hydro-Quebec system reached 29,131 MW, and total power produced was 131.6 TWh. Total length of transmission and distribution lines in 1993 reached 29,869 km and 100,908 km respectively. 9 figs., 17 tabs

  10. Taylor Hydro plant goes live

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The 12.75 MW Taylor Hydroelectric Plant in Magrath, Alberta, synchronized its generator with the Alberta Power Grid and began production in April 2000. The plant is located on Government of Alberta irrigation works and is owned by Canadian Hydro Developers. During the irrigation season the plant will generate approximately 40 million kilowatt hours of zero-emission 'green' power for consumption, enough to power 5,000 homes for a year. The Taylor plant is a joint venture with EPCOR Power Development Corporation, a wholly-owned subsidiary of EPCOR Inc., the City of Edmonton utility. Canadian Hydro Developers also owns a 19 MW wind plant and a 6 MW gas plant in Alberta and five other 'run of river' hydro plants in Ontario and British Columbia. The company is committed to the concept of low-impact power generation; its ownership of wind run-of-river hydro and gas-fired facilities is proof of that commitment

  11. Analysis of the reactivity of sulphur compounds in petroleum cuts: kinetics and modelling of hydro-treating; Analyse de la reactivite des composes soufres dans les coupes petrolieres: cinetique et modelisation de l'hydrotraitement

    Energy Technology Data Exchange (ETDEWEB)

    Lopez Garcia, C.

    2000-12-01

    The study of the hydro-treating of middle distillates comprised the following steps: - Identification and reactivity study of the sulphur compounds present in these petroleum cuts; - Modelling of the process by a chemical kinetic approach. The hydro-treating of middle distillates is a refining process that allows elimination of organic compounds containing sulphur, nitrogen, oxygen and metals. The process also hydrogenates the aromatic compounds providing improved cetane index gas-oils while respecting the regulations that severely limit the content of sulphur compounds. The extension and the improvement of a kinetic model for the hydro-treating of LCO gas-oils (light cycle oil gas-oils) are presented in this work. In order to improve the hydro-desulfurization model predictions, a detailed identification of the sulphur compounds contained in LCO gas-oils was carried out using gas chromatography with a sulphur chemiluminescence detector (GC-SCD). The most refractory sulphur compounds (alkyl-di-benzothiophenes) were identified and lumped into different families. Based on a lumped reaction scheme with a Langmuir-Hinshelwood representation, the model takes into account the influence of temperature, total pressure and hydrogen sulphide partial pressure on the reaction rates for hydro-desulfurization, hydro-denitrogenation and hydro-de-aromatization. The model parameter estimation was based on experiments that were carried out on a micro-pilot unit using an industrial sulfided NiMo/Al{sub 2}O{sub 3} catalyst and LCO feedstocks. The analytical study of the sulphur compounds was also extended to the case of straight run gas-oils (SR). For these feedstocks, a method using high-resolution mass spectrometry coupled with gas chromatography (GC-HRMS) was developed. In this way, the kinetic model can now be extended for the SR gas-oil hydro-treating or for LCO-SR mixtures. (author)

  12. Ontario Hydro annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1987-04-01

    Ontario Hydro`s annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics.

  13. Homegrown hydro, part 2: Private sector an important resource for developing Canadian exports

    International Nuclear Information System (INIS)

    Wiebe, P. A.

    1994-01-01

    A review of four major hydro consultants across Canada illustrates how the private sector has become an important resource for export of Canadian goods and services. The major utilities have contributed in operations and training and have acted as catalysts in this process. An overview is presented of the history and export activities of four consultants: Monenco, Acres, SNC, and Klohn-Crippen. The linkage between domestic experience and expansion into foreign markets in hydro resource development is apparent. Domestic projects have fallen into a severe decline due to the market; it is suggested that cyclical markets might be avoided by constructing capacity in advance. A tally is provided of current Canadian projects, which represent a substantial economic potential for sustainable, renewable hydroelectric resource development. 1 fig

  14. Generalized economic model for evaluating disposal costs at a low-level waste disposal facility

    International Nuclear Information System (INIS)

    Baird, R.D.; Rogers, V.C.

    1985-01-01

    An economic model is developed which can be used to evaluate cash flows associated with the development, operations, closure, and long-term maintenance of a proposed Low-Level Radioactive Waste disposal facility and to determine the unit disposal charges and unit surcharges which might result. The model includes the effects of nominal interest rate (rate of return on investment, or cost of capital), inflation rate, waste volume growth rate, site capacity, duration of various phases of the facility history, and the cash flows associated with each phase. The model uses standard discounted cash flow techniques on an after-tax basis to determine that unit disposal charge which is necessary to cover all costs and expenses and to generate an adequate rate of return on investment. It separately considers cash flows associated with post-operational activities to determine the required unit surcharge. The model is applied to three reference facilities to determine the respective unit disposal charges and unit surcharges, with various values of parameters. The sensitivity of the model results are evaluated for the unit disposal charge

  15. Thermo-hydro-mechanical modelling of fractured rock masses application to radioactive wastes storage

    International Nuclear Information System (INIS)

    Vuillod, E.

    1995-01-01

    This work belongs to the Decovalex project (international cooperative project for the development of coupled models and their validation against experiments in nuclear waste isolation) of thermo-hydro-mechanical (THM) modeling of fractured rock massifs inside which high level radioactive waste disposal sites are simulated. The mathematical laws controlling the behaviour of the environment are resolved analytically in the case of a continuous environment (definition of an equivalent environment) and numerically if the environment is discontinuous (modeling of joints behaviour). The coupled THM models strongly influence the behaviour of a model. Modeling performed with the UDEC code shows the importance of HM couplings depending on whether the calculations are made in permanent or transient regime, and the influence of the loading path in the case of TM modeling. The geometry of fractures also influences the behaviour of the model. Studying the connexity of a fractures network allows to determine its degree of homogeneity. The comparison between two methods, continuous environment and discontinuous environment, has been carried out by determining the permeability tensor and the stress-deformation relations on fractured test-samples. It shows the differences in behaviour between an homogenized environment and a discrete environment. Finally two exercises of THM modeling of radioactive waste disposal sites illustrate the researches carried out. A far field model has permitted to compare the results obtained with calculation codes using different logics. The second model, a near field one, focusses more on the importance played by fracturing on the behaviour of the massif. The high density of the reference network has required some mathematical developments, in order to determine the representative equivalent volume (continuous approaches), and some mathematical analyses, to correctly simplify the environment (discontinuous approaches). These methods and analyses are

  16. Architecture at Hydro-Quebec. L'architecture a Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  17. A 100% renewable electricity generation system for New Zealand utilising hydro, wind, geothermal and biomass resources

    International Nuclear Information System (INIS)

    Mason, I.G.; Page, S.C.; Williamson, A.G.

    2010-01-01

    The New Zealand electricity generation system is dominated by hydro generation at approximately 60% of installed capacity between 2005 and 2007, augmented with approximately 32% fossil-fuelled generation, plus minor contributions from geothermal, wind and biomass resources. In order to explore the potential for a 100% renewable electricity generation system with substantially increased levels of wind penetration, fossil-fuelled electricity production was removed from an historic 3-year data set, and replaced by modelled electricity production from wind, geothermal and additional peaking options. Generation mixes comprising 53-60% hydro, 22-25% wind, 12-14% geothermal, 1% biomass and 0-12% additional peaking generation were found to be feasible on an energy and power basis, whilst maintaining net hydro storage. Wind capacity credits ranged from 47% to 105% depending upon the incorporation of demand management, and the manner of operation of the hydro system. Wind spillage was minimised, however, a degree of residual spillage was considered to be an inevitable part of incorporating non-dispatchable generation into a stand-alone grid system. Load shifting was shown to have considerable advantages over installation of new peaking plant. Application of the approach applied in this research to countries with different energy resource mixes is discussed, and options for further research are outlined.

  18. Numerical analysis of thermal impact on hydro-mechanical properties of clay

    Directory of Open Access Journals (Sweden)

    Xuerui Wang

    2014-10-01

    Full Text Available As is known, high-level radioactive waste (HLW is commonly heat-emitting. Heat output from HLW will dissipate through the surrounding rocks and induce complex thermo-hydro-mechanical-chemical (THMC processes. In highly consolidated clayey rocks, thermal effects are particularly significant because of their very low permeability and water-saturated state. Thermal impact on the integrity of the geological barriers is of most importance with regard to the long-term safety of repositories. This study focuses on numerical analysis of thermal effects on hydro-mechanical properties of clayey rock using a coupled thermo-mechanical multiphase flow (TH2M model which is implemented in the finite element programme OpenGeoSys (OGS. The material properties of the numerical model are characterised by a transversal isotropic elastic model based on Hooke's law, a non-isothermal multiphase flow model based on van Genuchten function and Darcy's law, and a transversal isotropic heat transport model based on Fourier's law. In the numerical approaches, special attention has been paid to the thermal expansion of three different phases: gas, fluid and solid, which could induce changes in pore pressure and porosity. Furthermore, the strong swelling and shrinkage behaviours of clayey material are also considered in the present model. The model has been applied to simulate a laboratory heating experiment on claystone. The numerical model gives a satisfactory representation of the observed material behaviour in the laboratory experiment. The comparison of the calculated results with the laboratory findings verifies that the simulation with the present numerical model could provide a deeper understanding of the observed effects.

  19. Effects of Pomegranate peel hydroAlcoholic extract and vitamin E supplementation on Paraoxonase, myeloperoxidase Activities and nitric oxide levels following an exhaustive exercise in rats

    Directory of Open Access Journals (Sweden)

    Saeid Veiskarami

    2017-03-01

    Full Text Available Background: free radicals produced as a result of heavy training exercise especially oxygen species (ROS damage to body tissues Which can be prevent from this by consuming antioxidant substances timely. The aim of this study was to evaluate effect of Pomegranate (Punica Granatum peel hydro alcoholic on reduced of oxidative stress induced by an exhaustive exercise. Materials and Methods: Thirty two weight-matched male Wistar rats were evenly divided into: 1 control: received saline (0.2 ml saline/ rat by oral administration via epigastric tube. 2 Received oral administration of 200 mg/kg pomegranate peel hydro alcoholic extract (PPHE200. 3 Received oral administration of 250 mg/kg Pomegranate peel hydro alcoholic extract (PPHE250. 4 Received oral administration of vitamin E (vit E 5 mg/kg. Animals were submitted to swimming exhaustive exercise stress for an 8-week. At the end of the experiment, blood samples were collected for serum. Serum samples were analyzed for paraoxonase-1(PON-1 and myeloperoxidase (MPO activities and nitric oxide levels. Results: Paraoxonase-1 (PON-1 activities serum were significantly increases in PPHE200 (23.03±1.47, PPHE250 (23.59±1.98 and vit E (25.38±2.65 than in the control (18.57±1.380 (p<0.05.In PPHE200 (32.76±9.97 ،PPHE250 (31.45±6.05 and vit E (24.94±4.65 treated animals was determined in serum where myeloperoxidase activities reduced significantly compared with control (40.70±6.14 (p<0.05. Levels of Nitric oxide levels were significantly lower in PPHE 200 (46.59±2.48, PPHE250 (40.27±2.62 and vit E (36.25±3.82 treated than in control (47.18±5.36 (p<0.05. Conclusion: Results indicated that Pomegranate peel hydro alcoholic extract supplementations can strength antioxidant defense system and anti-inflammatory induced by exhaustive exercise.

  20. Models of the Economic Growth and their Relevance

    Directory of Open Access Journals (Sweden)

    Nicolae MOROIANU

    2012-06-01

    Full Text Available Until few years ago, the economic growth was something perfect normal, part of an era marked by the transformation speed. Normality itself has been transformed and we currently are influenced by other rules, unknown yet, which should answer the question: “How do we return to the economic growth?” The economic growth and the models aiming to solve this problem concern the economic history even since its beginnings. In this paper we would like to find out what is the relevance that the well-known macroeconomic models still have and which might be their applicability level in a framework created by a black swan event type.

  1. Moving forward socio-economically focused models of deforestation

    OpenAIRE

    DEZÉCACHE CAMILLE; SALLES JEAN-MICHEL; VIEILLEDENT GHISLAIN; HÉRAULT BRUNO

    2017-01-01

    While high resolution spatial variables contribute to a good fit of spatially-explicit deforestation models, socio-economic processes are often beyond the scope of these models. Such a low level of interest in the socio-economic dimension of deforestation limits the relevancy of these models for decision making and may be the cause of their failure to accurately predict observed deforestation trends in the medium term. This study aims to propose a flexible methodology for taking into account ...

  2. Influence Factors of the Economic Development Level Across European Countries

    Directory of Open Access Journals (Sweden)

    Diana Ioana POPA

    2016-06-01

    Full Text Available The economic development level of a country refers to the measure of the progress in an economy that could be measured, especially through GDP or GDP per capita. The level of these indicators can be influenced by many factors as a large scale, from social and economical to environmental and government policies factors. The paper aims to investigate some of these influence factors of the economic development level, represented in this case by GDP per capita, across European countries in the context of the most recently crisis, named the Great Recession (2008 and after, when the economies are starting to recover (2013. Using linear regression in R (lm function, the goal is to explain the relationship between the interest variable (GDP per capita and certain independent variables. It is expected that even tough the estimators are to be different – as level – in both cases studied, the relationship type between them to be the same. The goodness of fit for the models used will be made based on ANOVA.

  3. The Atlin Hydro Project : generation for generations

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, S. [Atlin Tlingit Development Corp., Atlin, BC (Canada)

    2010-07-01

    This presentation documented the step-by-step process by which the Atlin Hydro Project was developed. The Taku River Tlingit First Nation undertook the Atlin project as part of its vision for responsible resource management, sustainable economic development, and cultural revival. The Atlin Community Energy Plan involved an assessment of electricity demand, a 20-year demand projection, energy efficiency recommendations, and an assessment of power supply options such as wind towers, connection to the Yukon power grid, and hydro. The potential impact on fisheries, hydrology, wildlife habitat, roads and bridges, navigable waters and forests, existing rights, and First Nation archaeology were assessed, along with other factors such as hazards and flood control. A hydrology assessment of the Surprise-Pine Drainage Basin was undertaken, and stream-flow measurements were taken near the intake location on Pine Creek. The project comprises a discharge control structure and a fish ladder; an intake and weir on Pine Creek; a penstock pipeline from intake to powerhouse; a powerhouse with a 2.1 MW Pelton turbine generator and a switch yard; and a power line from the powerhouse to the interconnection with the existing grid. The impacts on fisheries, wildlife, and human movement are expected to be minimal. 28 figs., 3 tabs.

  4. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  5. Scheduling of a hydro producer considering head-dependency, price scenarios and risk-aversion

    International Nuclear Information System (INIS)

    Pousinho, H.M.I.; Mendes, V.M.F.; Catalão, J.P.S.

    2012-01-01

    Highlights: ► A MIQP approach is proposed for the short-term hydro scheduling problem. ► Head-dependency, discontinuous operating regions and discharge ramping constraints are considered. ► As new contribution to earlier studies, market uncertainty is introduced in the model via price scenarios. ► Also, risk aversion is incorporated by limiting the volatility of the expected profit through CVaR. ► A case study based on one of the main Portuguese cascaded hydro systems is provided. - Abstract: In this paper, a mixed-integer quadratic programming approach is proposed for the short-term hydro scheduling problem, considering head-dependency, discontinuous operating regions and discharge ramping constraints. As new contributions to earlier studies, market uncertainty is introduced in the model via price scenarios, and risk aversion is also incorporated by limiting the volatility of the expected profit through the conditional value-at-risk. Our approach has been applied successfully to solve a case study based on one of the main Portuguese cascaded hydro systems, requiring a negligible computational time.

  6. Optimizing Dredge-and-Dump Activities for River Navigability Using a Hydro-Morphodynamic Model

    Directory of Open Access Journals (Sweden)

    Andries J. Paarlberg

    2015-07-01

    Full Text Available Worldwide, significant dredging activities of riverbed sediment are employed to ensure that freight transportation on rivers can continue year-round. Imbalances of sediment budget may produce relevant impacts regarding river morphology and related environmental services. This study shows that hydro-morphodynamic modeling tools can be used to optimize dredge-and-dump activities and, at the same time, mitigate problems deriving from these activities in rivers. As a case study, we focused on dredging activities on the Lower Parana River, Argentina. Navigation on this river is of crucial importance to the economies of the bordering countries, hence, each year significant dredging activities are employed. To estimate dredging loads under different strategies, a 25 km river reach of the Parana River was modeled using the Delft3D-modelling suite by Deltares. The Netherlands, to simulate flow-sediment interactions in a quasi-steady and uncoupled approach. Impacts of dredging activities were explicitly included. Different dredge-and-dump strategies included variations in dredging over-depth (clearance and variations in dumping locations. Our results indicate that dredge-and-dump strategies can be targeted to stimulate natural processes that improve the depth and stability of the navigation channel and to counteract unwanted bed level responses in the long-medium term. A ~40% reduction in dredging effort could be achieved by moving the dredged material to distant locations in the secondary channel rather than dumping to the side of the waterway in the main channel.

  7. Hydro-Thermal Fatigue Resistance Measurements on Polymer Interfaces

    Science.gov (United States)

    Gurumurthy, Charan K.; Kramer, Edward J.; Hui, Chung-Yuen

    1998-03-01

    We have developed a new technique based on a fiber optic displacement sensor for rapid determination of hydro-thermal fatigue crack growth rate per cycle (da/dN) of an epoxy/polyimide interface used in flip chip attach microelectronic assembly. The sample is prepared as a trilayered cantilever beam by capillary flow of the epoxy underfill over a polyimide coated metallic beam. During hydro-thermal cycling the crack growth along the interface (from the free end) changes the displacement of this end of the beam and we measure the free end displacement at the lowest temperature in each hydro-thermal cycle. The change in beam displacement is then converted into crack growth rate (da/dN). da/dN depends on the maximum change in the strain energy release rate of the crack and the phase angle in each cycle. The relation between da/dN and maximum strain energy release rate characterizes the fatigue crack growth resistance of the interface. We have developed and used a simple model anhydride cured and a commercially available PMDA/ODA passivation for this study.

  8. Serum Albumin Levels and Economic Status in Japanese Older Adults.

    Directory of Open Access Journals (Sweden)

    Asami Ota

    Full Text Available Low serum albumin levels are associated with aging and medical conditions such as cancer, liver dysfunction, inflammation, and malnutrition and might be an independent predictor of long-term mortality in healthy older populations. We tested the hypothesis that economic status is associated with serum albumin levels and explained by nutritional and health status in Japanese older adults.We performed a cross-sectional analysis using data from the Japan Gerontological Evaluation study (JAGES. The study participants were 6528 functionally independent residents (3189 men and 3339 women aged ≥65 years living in four municipalities in Aichi prefecture. We used household income as an indicator of economic status. Multiple linear regression was used to compare serum albumin levels in relation to household income, which was classified as low, middle, and high. Additionally, mediation by nutritional and health-related factors was analyzed in multivariable models.With the middle-income group as reference, participants with low incomes had a significantly lower serum albumin level, even after adjustment for sex, age, residential area, education, marital status, and household structure. The estimated mean difference was -0.17 g/L (95% confidence interval, -0.33 to -0.01 g/L. The relation between serum albumin level and low income became statistically insignificant when "body mass index", "consumption of meat or fish", "self-rated health", "presence of medical conditions", "hyperlipidemia", or "respiratory disease "was included in the model.Serum albumin levels were lower in Japanese older adults with low economic status. The decrease in albumin levels appears to be mediated by nutrition and health-related factors with low household incomes. Future studies are needed to reveal the existence of other pathways.

  9. Home and away with Norwegian hydro

    International Nuclear Information System (INIS)

    Jones, Simon

    2000-01-01

    Evidence of Norway's position as a world leader in terms of design and construction of hydroelectric power plant, and its position as the biggest producer of hydro in Europe, is presented. There is still some 30 TWh of hydro available for development in Norway. Statkraft is the country's biggest hydro generator: it owns and operates 54 hydro plants and has shares in a further 30. Statkraft's research has shown that there is still a large market for renewables in Europe and believes that householders are prepared to pay a premium for green energy. Statkraft trades energy with Denmark and Sweden and is believed to be planning further growth overseas. The new millennium is set to bring major changes in Norway's power industry: Hafslund and Elkem have already agreed to merge to create the country's biggest privately-owned power group

  10. Sinkhole investigated at B.C. Hydro`s Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-07-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro`s W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig.

  11. Fully-coupled hydro-mechanical modelling of the D-holes and validation drift inflow

    International Nuclear Information System (INIS)

    Monsen, K.; Barton, N.; Makurat, A.

    1992-02-01

    This report presents the results from fully-coupled hydro-mechanical modelling of the D-hole and drift inflows. Joints represented in Harwells stochastically generated 8m x 8m x 8m cubes were used to select two possible joint geometries for two-dimensional rock mechanics simulations of the 2.8 x 2.2m validation drift, and the rock mass response to its excavation. The joints intersecting the four end faces of these cubes were set up in distinct element UDEC-BB models and loaded with boundary stresses of 10 MPa vertically and 14 MPa horizontally. In numerical models 5 and 8, which were run first as mechanical response (M) models (TR 91-05), full H-M coupling was performed, with calculations of inflow. In general, response to excavation was a little stronger than in hte un-coupled mechanical response (M) modelling. In the D-hole simulations, however, channel development int he disturbed zone could not occur due to less displacement taking place in the rock mass. For this reason, the stress levels were also generally much more moderate, preventing the joints from closing as much as in the drift simulations. Consequently, the D-hole model had a much better radial connectivity. It was possible to observe that the radial inflow to the D-holes was significantly higher than the flow into the drift models. However, due to the extremely small joint apertures involved (<1μm), time steps and calculation times were very slow in the H-M models, and although mechanical behaviour appeared to have reached equilibrium, there was evidence of continued transients in some of the flow regions. The drift excavation caused nearly total closing of critical joints due to local normal stress inceases. Near-blockage of fluid transportation routes was demonstrated. (au)

  12. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  13. CalSimHydro Tool - A Web-based interactive tool for the CalSim 3.0 Hydrology Prepropessor

    Science.gov (United States)

    Li, P.; Stough, T.; Vu, Q.; Granger, S. L.; Jones, D. J.; Ferreira, I.; Chen, Z.

    2011-12-01

    CalSimHydro, the CalSim 3.0 Hydrology Preprocessor, is an application designed to automate the various steps in the computation of hydrologic inputs for CalSim 3.0, a water resources planning model developed jointly by California State Department of Water Resources and United States Bureau of Reclamation, Mid-Pacific Region. CalSimHydro consists of a five-step FORTRAN based program that runs the individual models in succession passing information from one model to the next and aggregating data as required by each model. The final product of CalSimHydro is an updated CalSim 3.0 state variable (SV) DSS input file. CalSimHydro consists of (1) a Rainfall-Runoff Model to compute monthly infiltration, (2) a Soil moisture and demand calculator (IDC) that estimates surface runoff, deep percolation, and water demands for natural vegetation cover and various crops other than rice, (3) a Rice Water Use Model to compute the water demands, deep percolation, irrigation return flow, and runoff from precipitation for the rice fields, (4) a Refuge Water Use Model that simulates the ponding operations for managed wetlands, and (5) a Data Aggregation and Transfer Module to aggregate the outputs from the above modules and transfer them to the CalSim SV input file. In this presentation, we describe a web-based user interface for CalSimHydro using Google Earth Plug-In. The CalSimHydro tool allows users to - interact with geo-referenced layers of the Water Budget Areas (WBA) and Demand Units (DU) displayed over the Sacramento Valley, - view the input parameters of the hydrology preprocessor for a selected WBA or DU in a time series plot or a tabular form, - edit the values of the input parameters in the table or by downloading a spreadsheet of the selected parameter in a selected time range, - run the CalSimHydro modules in the backend server and notify the user when the job is done, - visualize the model output and compare it with a base run result, - download the output SV file to be

  14. Ekstraksi Minyak Atsiri Dari Akar Wangi Menggunakan Metode Steam - Hydro distillation dan Hydro distilation dengan Pemanas Microwave

    Directory of Open Access Journals (Sweden)

    Maulana M Al Hanief

    2013-09-01

    Full Text Available Penelitian ini bertujuan untuk memperoleh minyak atsiri dari akar wangi dengan modifikasi metode steam-hydro distillation dan hydro distillation yaitu menggunakan pemanasan microwave kemudian membandingkan hasilnya dengan penelitian sebelumnya. Modifikasi ini diharapkan lebih efisien dalam masalah lama penyulingan dan kualitas serta kuantitas rendemen minyak yang lebih baik dan banyak. Penelitian ini menggunakan dua metode yaitu steam-hydro distillation dan hydro distillation dengan pemanfaatan gelombang mikro. Bahan baku yang digunakan dalam penelitian adalah akar wangi jenis pulus wangi yang tumbuh di Kabupaten Garut, Jawa Barat. Variabel yang digunakan adalah bahan baku yang dicacah dan bahan baku utuh dengan variasi massa bahan 50 gr, 60, gr, 70 gr, 80 gr, dan 90 gr dengan pelarut air sebanyak 450 ml dalam labau distiller berukuran 1000 ml. Lama penyulingan adalah lima jam dengan pengamatan tiap 30 menit serta daya yang digunakan adalah 400 Watt. Analisa terhadap hasil minyak atsiri yang diperoleh antara lain analisa GC-MS, spesific gravity, indeks bias, dan bilangan asam. Hasil dari penelitian ini dibandingkan dengan hasil penelitian terdahulu yang tidak memanfaatkan gelombang mikro. Dari hasil penelitian diperoleh % rendemen kumulatif, sifat fisik, sifat kimia, dan kandungan komponen minyak dari metode steam-hydro distillation lebih baik dibandingkan metode hydro distillation ditandai dengan kuantitas dan kualitas yang sesuai dengan SNI.  Sementara itu jika dibandingkan dengan metode terdahulu dapat disimpulkan bahwa penggunaan gelombang mikro lebih efisien dalam waktu dan kuantitas serta kualitas minyak yang lebih baik dibandingkan tanpa penggunaan gelombang mikro

  15. Hydro-Quebec looks south

    International Nuclear Information System (INIS)

    Ross, P.

    1997-01-01

    The recent introduction of Hydro-Quebec, the Canadian utility, into selling cheap electric power in the United States (US) deregulated power market is described, following applications to the US Federal Energy Regulatory Commission. As its prices are so much cheaper than its US competitors, it is expected that the company will soon have many willing customers across the USA. Hydro-Quebec will remain a publicly owned utility, but has experienced restructuring in order to meet this new competitive challenge. (UK)

  16. Hydro to market green power at special prices

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1996-01-01

    A 600 kW grid-connected demonstration wind turbine at Ontario Place will provide green power to Toronto residents early in 1997. The joint venture project partners include publicly owned Ontario Hydro, Toronto Hydro and Natural Resources Canada. The power will be sold at a premium under arrangements yet to be announced. The green power pricing initiative would allow some customers to buy their electricity at a green price. The project could be a self-financing model for future renewable energy development. The Ontario Place turbine project will determine whether Toronto electricity customers want green power or electricity from nuclear and fossil stations, and could determine which type of generation should be built in the future

  17. Modelling the interaction between flooding events and economic growth

    Science.gov (United States)

    Grames, Johanna; Fürnkranz-Prskawetz, Alexia; Grass, Dieter; Viglione, Alberto; Blöschl, Günter

    2016-04-01

    Recently socio-hydrology models have been proposed to analyze the interplay of community risk-coping culture, flooding damage and economic growth. These models descriptively explain the feedbacks between socio-economic development and natural disasters such as floods. Complementary to these descriptive models, we develop a dynamic optimization model, where the inter-temporal decision of an economic agent interacts with the hydrological system. This interdisciplinary approach matches with the goals of Panta Rhei i.e. to understand feedbacks between hydrology and society. It enables new perspectives but also shows limitations of each discipline. Young scientists need mentors from various scientific backgrounds to learn their different research approaches and how to best combine them such that interdisciplinary scientific work is also accepted by different science communities. In our socio-hydrology model we apply a macro-economic decision framework to a long-term flood-scenario. We assume a standard macro-economic growth model where agents derive utility from consumption and output depends on physical capital that can be accumulated through investment. To this framework we add the occurrence of flooding events which will destroy part of the capital. We identify two specific periodic long term solutions and denote them rich and poor economies. Whereas rich economies can afford to invest in flood defense and therefore avoid flood damage and develop high living standards, poor economies prefer consumption instead of investing in flood defense capital and end up facing flood damages every time the water level rises. Nevertheless, they manage to sustain at least a low level of physical capital. We identify optimal investment strategies and compare simulations with more frequent and more intense high water level events.

  18. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  19. Small steps for hydro

    International Nuclear Information System (INIS)

    Wicke, Peter

    1998-01-01

    The government in Peru has decided to utilise its gas reserves and restrict hydro to relatively small schemes. A number of reasons for the decision are given. In 1997, the Shell-Mobile-Bechtel-COSAPI consortium was formed and agreements were signed regarding exploiting Gas de Camisea. The country's energy needs to 2010 are being assessed. It is likely that by 2001 the whole of south Peru will be receiving gas from Camisea. The Peru situation is discussed under the headings of (i) existing capacity, (ii) growing demands, (iii) a history of hydro in Peru, (iv) electrification and SHP and (v) outlook. The future for Peru's electric energy development is bright. While most of its new power capacity will come from natural gas, the small hydros also have a part to play. A stronger commitment of national and regional political authorities to consider supplies outside the big cities is said to be needed. (UK)

  20. Bio-economic modeling of water quality improvements using a dynamic applied general equilibrium approach

    NARCIS (Netherlands)

    Dellink, R.; Brouwer, R.; Linderhof, V.G.M.; Stone, K.

    2011-01-01

    An integrated bio-economic model is developed to assess the impacts of pollution reduction policies on water quality and the economy. Emission levels of economic activities to water are determined based on existing environmental accounts. These emission levels are built into a dynamic economic model

  1. A multi-scale computational scheme for anisotropic hydro-mechanical couplings in saturated heterogeneous porous media

    NARCIS (Netherlands)

    Mercatoris, B.C.N.; Massart, T.J.; Sluys, L.J.

    2013-01-01

    This contribution discusses a coupled two-scale framework for hydro-mechanical problems in saturated heterogeneous porous geomaterials. The heterogeneous nature of such materials can lead to an anisotropy of the hydro-mechanical couplings and non-linear effects. Based on an assumed model of the

  2. Home grown hydro, part 3: Vision, leadership needed to develop and implement crucial long-term strategies

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, P.A

    1994-09-01

    The Asian Pacific area offers good prospects for Canadian exports of equipment and expertise in the area of hydropower development. Rapidly growing economies in this area have large unsatisfied power demands, and many of these countries have significant undeveloped hydroelectric potential (notably China). Recent Canadian successes in Asia-Pacific hydropower developments are outlined, including the Chamera project in Himachal Pradesh, India; the feasibility study of the Three Gorges project, China; and technical assistance on a 5,000 MW hydroelectric project in Longtan, China. The issues facing Canada for developing and implementing long-term hydro development strategies are discussed. These issues are: establishing Canada's own energy needs; coordination and integration of Canadian hydro resource development; environmental issues and sustainable development; and realizing that energy exports are ethical. Benefits of domestic and international hydro development include environmental friendliness, creation of jobs and markets for Canadian products and expertise, and stimulation of technological and economic development. 1 tab.

  3. Home grown hydro, part 3: Vision, leadership needed to develop and implement crucial long-term strategies

    International Nuclear Information System (INIS)

    Wiebe, P.A.

    1994-01-01

    The Asian Pacific area offers good prospects for Canadian exports of equipment and expertise in the area of hydropower development. Rapidly growing economies in this area have large unsatisfied power demands, and many of these countries have significant undeveloped hydroelectric potential (notably China). Recent Canadian successes in Asia-Pacific hydropower developments are outlined, including the Chamera project in Himachal Pradesh, India; the feasibility study of the Three Gorges project, China; and technical assistance on a 5,000 MW hydroelectric project in Longtan, China. The issues facing Canada for developing and implementing long-term hydro development strategies are discussed. These issues are: establishing Canada's own energy needs; coordination and integration of Canadian hydro resource development; environmental issues and sustainable development; and realizing that energy exports are ethical. Benefits of domestic and international hydro development include environmental friendliness, creation of jobs and markets for Canadian products and expertise, and stimulation of technological and economic development. 1 tab

  4. Modelling the economic consequences of Marine Protected Areas using the BEMCOM model

    DEFF Research Database (Denmark)

    Hoff, A.; Andersen, J.L.; Christensen, Asbjørn

    2013-01-01

    the question ‘what’s best?’, i.e. finds the overall optimal effort allocation, from an economic point of view, between multiple harvesting fleets fishing under a subset of restrictions on catches and effort levels. The BEMCOM model is described and applied to the case of the Danish sandeel fishery in the North......This paper introduces and describes in detail the bioeconomic optimization model BEMCOM (BioEconomic Model to evaluate the COnsequences of Marine protected areas) that has been developed to assess the economic effects of introducing Marine Protected Areas (MPA) for fisheries. BEMCOM answers...... Sea. It has several times been suggested to close parts of the sandeel fishery in the North Sea out of concern for other species feeding on sandeel and/or spawning in the sandeel habitats. The economic effects of such closures have been assessed using BEMCOM. The results indicate that the model yields...

  5. Role of model structure on the response of soil biogeochemistry to hydro-climatic fluctuations

    Science.gov (United States)

    Manzoni, S.; Porporato, A.

    2005-05-01

    Soil carbon and nutrient cycles are strongly affected by hydro-climatic variability, which interacts with the internal ecosystem structure. Here we test the implications of biogeochemical model structure on such dynamics by extending an existing model by the authors and coworkers. When forced by hydro-climatic fluctuations, the different model structures induce specific preferential nutrient paths among the soil pools, which in turn affect nutrient distribution and availability to microbes and plants. In particular, if it is assumed that microbes can directly assimilate organic nitrogen, plants tend to be inferior competitors for nutrients even in well-watered conditions, while if a certain amount of organic nitrogen is assumed to be mineralized without being first incorporated into microbial cells, vegetation can be advantaged over a wide range of soil moisture values. We also investigate the intensification of competition for nutrients (e.g., nitrogen) between plant and soil microbial communities under extreme hydrologic conditions, such as droughts and intense storms. Frequent rainfall events may determine ideal soil moisture conditions for plant uptake, enhancing nitrogen leaching while lowering oxygen concentration and inhibiting microbial activity. During droughts, the soil water potential often drops to the point of hampering the plant nutrient uptake while still remaining high enough for microbial decomposition and nitrogen immobilization. The interplay of microbe and vegetation water stress is investigated in depth as it controls the ability of one community (e.g., plants or soil microbes) to establish competitive advantage on the other. The long-term effects of these dynamics of competition and nutrient allocation are explored under steady-state and stochastic soil moisture conditions to analyze the feedbacks between soil organic matter and vegetation dynamics.

  6. An efficient hydro-mechanical model for coupled multi-porosity and discrete fracture porous media

    Science.gov (United States)

    Yan, Xia; Huang, Zhaoqin; Yao, Jun; Li, Yang; Fan, Dongyan; Zhang, Kai

    2018-02-01

    In this paper, a numerical model is developed for coupled analysis of deforming fractured porous media with multiscale fractures. In this model, the macro-fractures are modeled explicitly by the embedded discrete fracture model, and the supporting effects of fluid and fillings in these fractures are represented explicitly in the geomechanics model. On the other hand, matrix and micro-fractures are modeled by a multi-porosity model, which aims to accurately describe the transient matrix-fracture fluid exchange process. A stabilized extended finite element method scheme is developed based on the polynomial pressure projection technique to address the displacement oscillation along macro-fracture boundaries. After that, the mixed space discretization and modified fixed stress sequential implicit methods based on non-matching grids are applied to solve the coupling model. Finally, we demonstrate the accuracy and application of the proposed method to capture the coupled hydro-mechanical impacts of multiscale fractures on fractured porous media.

  7. Real-time versus day-ahead market power in a hydro-based electricity market

    OpenAIRE

    Tangerås, Thomas P.; Mauritzen, Johannes

    2014-01-01

    We analyse in a theoretical framework the link between real-time and day-ahead market performance in a hydro-based and imperfectly competitive wholesale electricity market. Theoretical predictions of the model are tested on data from the Nordic power exchange, Nord Pool Spot (NPS).We reject the hypothesis that prices at NPS were at their competitive levels throughout the period under examination. The empirical approach uses equilibrium prices and quantities and does not rely on bid data nor o...

  8. Hydro or the waltz of managers

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    A critique of current management and personnel problems at Hydro-Quebec was presented. With 20,000 employees and some of the world's greatest hydroelectric projects to its credit, Hydro-Quebec has historically been a source of great pride for its employees and Quebec's society. However, recent problems related to management, bureaucratization and communications within the corporation have led to important moral problems within the workforce. Management of the corporation under the newly appointed president, Andre Caille, the issue of profitability and competitiveness, the worsening morale among employees and the relationship between Hydro-Quebec and the provincial government were the principal topics discussed

  9. A Model for Assessing the Gender Aspect in Economic Policy

    Directory of Open Access Journals (Sweden)

    Ona Rakauskienė

    2015-06-01

    Full Text Available The purpose of research is to develop a conceptual model for assessing the impact of the gender aspect on economic policy at macro– and microeconomic levels. The research methodology is based on analysing scientific approaches to the gender aspect in economics and gender–responsive budgeting as well as determining the impact of the gender aspect on GDP, foreign trade, the state budget and the labour market. First, the major findings encompass the main idea of a conceptual model proposing that a socio–economic picture of society can be accepted as completed only when, alongside public and private sectors, includes the care/reproductive sector that is dominated by women and creating added value in the form of educated human resources; second, macroeconomics is not neutral in terms of gender equality. Gender asymmetry is manifested not only at the level of microeconomics (labour market and business but also at the level of macroeconomics (GDP, the state budget and foreign trade, which has a negative impact on economic growth and state budget revenues. In this regard, economic decisions, according to the principles of gender equality and in order to achieve gender equality in economics, must be made, as the gender aspect has to be also implemented at the macroeconomic level.

  10. Comparison between MPC and PID control for compact hydro ...

    African Journals Online (AJOL)

    This paper presents water temperature of a hydro distillation that have been modelled by using linear ARX Modal. Based on the modal obtained, a model predictive controller and PID controller have been developed. Both controller undergone the performance of controller tests that includes set point, set point change and ...

  11. Combining loss and cost objectives in daily hydro-thermal economic scheduling

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1991-01-01

    A formulation of optimal hydro-thermal power flow in electric power systems combining the minimum loss objective with the more conventional minimum fuel cost objective is considered. The implementation is based on a Newton's iterative procedure, with special initial guess and sparsity-based matrix manipulations to obtain improved convergence properties. The strategies are developed using three standard test systems. This paper discusses the question of assigning an equivalent cost to the loss objective component and compare results obtained using two proposed mechanisms. The first is based on results of conventional dispatch using Kron's loss formula and the second uses the bus incremental costs involved in the OPF solution. The effects of varying the relative weights assigned to each objective component on pertinent system variables such as active and reactive power generations as well as voltages are explored

  12. Island operation - modelling of a small hydro power system

    Energy Technology Data Exchange (ETDEWEB)

    Skarp, Stefan

    2000-02-01

    Simulation is a useful tool for investigating a system behaviour. It is a way to examine operating situations without having to perform them in reality. If someone for example wants to test an operating situation where the system possibly will demolish, a computer simulation could be a both cheaper and safer way than to do the test in reality. This master thesis performs and analyses a simulation, modelling an electronic power system. The system consists of a minor hydro power station, a wood refining industry, and interconnecting power system components. In the simulation situation the system works in a so called island operation. The thesis aims at making a capacity analysis of the current system. Above all, the goal is to find restrictions in load power profile of the consumer, under given circumstances. The computer software used in simulations is Matlab and its additional program PSB (Power System Blockset). The work has been carried out in co-operation with the power supplier Skellefteaa Kraft, where the problem formulation of this master thesis was founded.

  13. Re-potentiation of hydro-generators: a proposal of analysis and implementation methodology; Repotenciacao de hidrogeradores: uma proposta de metodologia de analise e implantacao

    Energy Technology Data Exchange (ETDEWEB)

    Sa, Fabio Salomao Fernandes

    1996-07-01

    The hydro-generators suffer during its operative useful life a combination of stresses of nature thermal, electric, mechanics and environmental. With the time, they are going losing the capacity to support those stresses and the power plants suffer, more and more frequently, undesirable stops for repair services and maintenance. In function of the high costs incurred with these stopped, the operation of the power plant can be economically impracticable. That unavailability of the generation for the electric system, it results in reduction of the reliability, burdening the politics of load ruling. The re-potentiation is a proposal that seeks to extend the useful life of hydro-generators, at the same time that it try to rescue the reliability and the readiness of the plant, with larger power. The power increase is usually made possible, or for the surplus of the hydro resources in excess, or for the reduction of the losses of all the components of the energy flow. That work proposes a methodology structured starting from the estimate of the potential, of rising of data, of the basic project and of the executive project. Modern techniques of engineering, new processes and new materials, allow the re-potentiation of those hydro-generators returning them new useful life, under conditions economically justifiable.

  14. Chemo-hydro-mechanical behaviour of unsaturated clays

    International Nuclear Information System (INIS)

    Mokni, N.; Olivella, S.; Alonso, E.E.; Romero, E.

    2010-01-01

    Document available in extended abstract form only. Understanding of the chemical effects on clays is essential for many problems ranging from pollution studies and waste-containment. Several studies examined the effect of changes in pore fluid composition on the mechanical and hydraulic properties. Volume changes (contraction/ expansion) have been measured on clay specimens upon exposure to salt solutions or permeation with organic liquids. Moreover, it was shown that permeation of clay with brine induces an increase of the shear strength. In addition, several models have been proposed to describe the chemo-mechanical behaviour of saturated clays under saturated conditions. A new chemo-hydro-mechanical model for unsaturated clays is under development. The chemo-mechanical effects are described within an elasto-plastic framework using the concept that chemical effects act on the plastic properties by increasing or decreasing the pre-consolidation stress. The model is based on the distinction within the material of a microstructural and a macro-structural levels. Chemical loading has a significant effect on the microstructure. The negative pressure associated with the capillary water plays its role in the interconnected macro pores. By adopting simple assumptions concerning the coupling between the two levels it is intended to reproduce the features of the behaviour of unsaturated clays when there is a change in pore fluid composition (increase or decrease of concentration). A yield surface which defines the set of yield pre-consolidation stress values, for each associated capillary suction and concentration of pore fluid should be defined. In addition, the behaviour of clays under unsaturated condition and the behaviour at full saturation under chemical loading represent two limiting cases of the framework. Studies on the compatibility of Boom Clay with large amounts of nitrate- bearing bituminized radioactive waste have recently raised a particular interest on the

  15. Pricing Energy and Ancillary Services in a Day-Ahead Market for a Price-Taker Hydro Generating Company Using a Risk-Constrained Approach

    Directory of Open Access Journals (Sweden)

    Perica Ilak

    2014-04-01

    Full Text Available This paper analyzes a price-taker hydro generating company which participates simultaneously in day-ahead energy and ancillary services markets. An approach for deriving marginal cost curves for energy and ancillary services is proposed, taking into consideration price uncertainty and opportunity cost of water, which can later be used to determine hourly bid curves. The proposed approach combines an hourly conditional value-at-risk, probability of occurrence of automatic generation control states and an opportunity cost of water to determine energy and ancillary services marginal cost curves. The proposed approach is in a linear constraint form and is easy to implement in optimization problems. A stochastic model of the hydro-economic river basin is presented, based on the actual Vinodol hydropower system in Croatia, with a complex three-dimensional relationship between the power produced, the discharged water, and the head of associated reservoir.

  16. The economics of nuclear power

    International Nuclear Information System (INIS)

    Hunt, H.; Betteridge, G.

    1978-01-01

    It is stated that nuclear power stations throughout the world are now providing consumers with substantially the cheapest electricity, except in areas with extensive hydro-power or cheap, clean, local coal. Thermal nuclear power stations will continue to provide economic electricity until the cost of uranium rises to several times the present level; fast reactors have the potential to continue to stabilise the cost of electricity and by moderating demand for other fuels will keep down their cost also. Headings of this paper include -The historical perspective; methods of comparing nuclear and fossil generating costs; historical comparisons of UK nuclear and fossil generating costs; waste storage and decommissioning; future changes in costs; criteria for future investment in nuclear power; alternative methods of comparison; total system cost analysis; the economics of fast reactors; and the ultimate role of fast reactors. 13 references. (author)

  17. Hydro-Quebec's environmental policy

    International Nuclear Information System (INIS)

    1996-10-01

    Hydro-Quebec established a new environmental policy on August 1, 1996. A summary of the policy was presented. According to this policy statement the utility undertakes to recognize the environmental implications of its activities and assumes responsibilities for these implications by integrating them into its corporate decision-making processes. The following general principles and means of implementation have been highlighted: (1) sustainable development, (2) strict, responsible environmental management, (3) environmental research, (4) enhancement of activities and facilities, (5) information, consultation and dialogue, and (6) environmental responsibility of Hydro-Quebec personnel, subsidiaries and business partners

  18. Sustainability and economics: The Adirondack Park experience, a forest economic-ecological model, and solar energy policy

    Science.gov (United States)

    Erickson, Jon David

    The long-term sustainability of human communities will depend on our relationship with regional environments, our maintenance of renewable resources, and our successful disengagement from nonrenewable energy dependence. This dissertation investigates sustainability at these three levels, following a critical analysis of sustainability and economics. At the regional environment level, the Adirondack Park of New York State is analyzed as a potential model of sustainable development. A set of initial and ongoing conditions are presented that both emerge from and support a model of sustainability in the Adirondacks. From these conditions, a clearer picture emerges of the definition of regional sustainability, consequences of its adoption, and lessons from its application. Next, an economic-ecological model of the northern hardwood forest ecosystem is developed. The model integrates economic theory and intertemporal ecological concepts, linking current harvest decisions with future forest growth, financial value, and ecosystem stability. The results indicate very different economic and ecological outcomes by varying opportunity cost and ecosystem recovery assumptions, and suggest a positive benefit to ecological recovery in the forest rotation decision of the profit maximizing manager. The last section investigates the motives, economics, and international development implications of renewable energy (specifically photovoltaic technology) in rural electrification and technology transfer, drawing on research in the Dominican Republic. The implications of subsidizing a photovoltaic market versus investing in basic research are explored.

  19. Climate impact on BC Hydro's water resources

    International Nuclear Information System (INIS)

    Smith, D.; Rodenhuis, D.

    2008-01-01

    BC Hydro like many other hydro utilities has used the historical record of weather and runoff as the standard description the variability and uncertainty of the key weather drivers for its operation and planning studies. It has been conveniently assumed that this historical record is or has been statistically stationary and therefore is assumed to represent the future characteristics of climatic drivers on our system. This assumption is obviously no longer justifiable. To address the characterisation of future weather, BC Hydro has a multi-year a directed research program with the Pacific Climate Impacts Consortium to evaluate the impacts of climate change on the water resources that BC Hydro manages for hydropower generation and other uses. The objective of this program is to derive climate change adjusted meteorologic and hydrologic sequences suitable for use in system operations and planning studies. These climate-adjusted sequences then can be used to test system sensitivity to climate change scenarios relative to the baseline of the historical record. This paper describes BC Hydro's research program and the results achieved so far. (author)

  20. Moving forward socio-economically focused models of deforestation.

    Science.gov (United States)

    Dezécache, Camille; Salles, Jean-Michel; Vieilledent, Ghislain; Hérault, Bruno

    2017-09-01

    Whilst high-resolution spatial variables contribute to a good fit of spatially explicit deforestation models, socio-economic processes are often beyond the scope of these models. Such a low level of interest in the socio-economic dimension of deforestation limits the relevancy of these models for decision-making and may be the cause of their failure to accurately predict observed deforestation trends in the medium term. This study aims to propose a flexible methodology for taking into account multiple drivers of deforestation in tropical forested areas, where the intensity of deforestation is explicitly predicted based on socio-economic variables. By coupling a model of deforestation location based on spatial environmental variables with several sub-models of deforestation intensity based on socio-economic variables, we were able to create a map of predicted deforestation over the period 2001-2014 in French Guiana. This map was compared to a reference map for accuracy assessment, not only at the pixel scale but also over cells ranging from 1 to approximately 600 sq. km. Highly significant relationships were explicitly established between deforestation intensity and several socio-economic variables: population growth, the amount of agricultural subsidies, gold and wood production. Such a precise characterization of socio-economic processes allows to avoid overestimation biases in high deforestation areas, suggesting a better integration of socio-economic processes in the models. Whilst considering deforestation as a purely geographical process contributes to the creation of conservative models unable to effectively assess changes in the socio-economic and political contexts influencing deforestation trends, this explicit characterization of the socio-economic dimension of deforestation is critical for the creation of deforestation scenarios in REDD+ projects. © 2017 John Wiley & Sons Ltd.

  1. The use of remote sensing and GIS techniques with special emphasis on the use of Arc hydro data model in characterizing Atbara River watershed

    International Nuclear Information System (INIS)

    Adam, M. H. M.

    2010-11-01

    Remote sensing and GIS techniques were used successfully to establish hydrological information platform for Atbara sub-basin which drains from Ethiopia and Eretria to Sudan with entire area of about 224299 Km 2 . The study area have strategic importance, for many reasons; rich in minerals wealth, agricultural resources, and endowed with a substantial amount of water resources but the spatial and temporal distribution of water resources is imbalance. Remote Sensing and Digital elevation models (DEMs) are known to be very useful data sources for the automated delineation of flow paths, sub watersheds and flow networks for hydrologic modeling and watershed characterization, Landsat ETM + 30 m and Digital Elevation Models SRTM 90 m data used in this project, many digital image processing techniques used to enhanced images, interpretation and extracted information from satellite images by using ERDAS imagine, wile Arc GIS and arc hydro tools were used to processing and extract information from DEMs, stream network and catchment delineation and creation of geo database. It is the main output of this project, ready made GIS layers used to complete watershed characterizations view. The results of this research present in creation Arc hydro data model, and many thematic maps for Atbara sub-basin characteristics. The use of remote sensing in the study give efficient qualitative and quantitative detailed information about geomorphologic features drainage patterns, addition to general overview for land cover and land use. Moreover, the use of Digital Elevation Models in addition to the delineation of stream network and catchment give valuable information on the pale-geography and pale-climate of the study area. River network and watersheds delineations proved that El Gash River was once joining the Atbara River and it was a part of Nile Basin System. This might indicate that pale climatic conditions in the area were wet than the present. Geo database and Arc hydro data model

  2. Effective Hydro-Mechanical Properties of Fluid-Saturated Fracture Networks

    Science.gov (United States)

    Pollmann, N.; Vinci, C.; Renner, J.; Steeb, H.

    2015-12-01

    Consideration of hydro-mechanical processes is essential for the characterization of liquid-resources as well as for many engineering applications. Furthermore, the modeling of seismic waves in fractured porous media finds application not only in geophysical exploration but also reservoir management. Fractures exhibit high-aspect-ratio geometries, i.e. they constitute thin and long hydraulic conduits. Motivated by this peculiar geometry, the investigation of the hydro-mechanically coupled processes is performed by means of a hybrid-dimensional modeling approach. The effective material behavior of domains including complex fracture patterns in a porous rock is assessed by investigating the fluid pressure and the solid displacement of the skeleton saturated by compressible fluids. Classical balance equations are combined with a Poiseuille-type flow in the dimensionally reduced fracture. In the porous surrounding rock, the classical Biot-theory is applied. For simple geometries, our findings show that two main fluid-flow processes occur, leak-off from fractures to the surrounding rock and fracture flow within and between the connected fractures. The separation of critical frequencies of the two flow processes is not straightforward, in particular for systems containing a large number of fractures. Our aim is to model three dimensional hydro-mechanically coupled processes within complex fracture patterns and in particular determine the frequency-dependent attenuation characteristics. Furthermore, the effect of asperities of the fracture surfaces on the fracture stiffness and on the hydraulic conductivity will be added to the approach.

  3. Hydro-Quebec and energy efficiency

    International Nuclear Information System (INIS)

    1990-01-01

    There is growing awareness that energy efficiency is both profitable and environmentally beneficial. In this year's Development Plan, Hydro-Quebec is proposing an Energy Efficiency Project made up of marketing programs designed for all markets throughout the final decade of the 20th century. This Project will have two aspects: energy efficiency and consumption management. Hydro-Quebec aims to reach an energy-efficiency level of 12.9 terawatt hours per year by 1999, fully 55% of its 23-terawatt hour potential. Over the next 10 years the utility intends to spend $1.8 billion for this purpose. Cumulative anticipated energy savings should be in the vicinity of 70 terawatt hours for the coming decade, and more than 130 terawatt hours for the first decade of the next century. Of the overall goal of 12.9 terawatt hours for Horizon 1999, energy savings of 9.0 terawatt hours should be the direct result of this year's proposed marketing programs, and will account for the bulk of anticipated investments. The remaining 3.9 terawatt hours will be gained as customers acquire better electrical appliance and accessory (household appliances, home insulation) buying habits

  4. Strengthening Environmental Economics Capacity in Research on ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... change are likely to have a negative impact on water availability and quality. ... on water provision services in Latin America using environmental economics methods. ... Effect of hydro-meteorological emergencies on internal migration.

  5. A study of hydro-elastic instabilities of a weir

    International Nuclear Information System (INIS)

    Lacroix, C.; Viollet, P.L.

    1987-01-01

    Following low-frequency oscillations which appeared during the initial isothermal tests of Super-Phenix, LNH developed a scale model together with an analytical model approach. The hydro-elastic model allowed to set the phenomena to evidence and quantify the depending parameters influence, while the analytical approach allowed to have a better understanding of the phenomena and of the main parameters dependence [fr

  6. Accounting for hydro-climatic and water use variability in the assessment of past and future water balance at the basin scale

    Directory of Open Access Journals (Sweden)

    J. Fabre

    2015-06-01

    Full Text Available This study assesses water stress by 2050 in river basins facing increasing human and climatic pressures, by comparing the impacts of various combinations of possible future socio-economic and climate trends. A modelling framework integrating human and hydro-climatic dynamics and accounting for interactions between resource and demand at a 10-day time step was developed and applied in two basins of different sizes and with contrasted water uses: the Herault (2500 km2, France and the Ebro (85 000 km2, Spain basins. Natural streamflow was evaluated using a conceptual hydrological model (GR4j. A demand-driven reservoir management model was designed to account for streamflow regulations from the main dams. Urban water demand was estimated from time series of population and monthly unit water consumption data. Agricultural water demand was computed from time series of irrigated area, crop and soil data, and climate forcing. Indicators comparing water supply to demand at strategic resource and demand nodes were computed. This framework was successfully calibrated and validated under non-stationary human and hydro-climatic conditions over the last 40 years before being applied under four combinations of climatic and water use scenarios to differentiate the impacts of climate- and human-induced changes on streamflow and water balance. Climate simulations from the CMIP5 exercise were used to generate 18 climate scenarios at the 2050 horizon. A baseline water use scenario for 2050 was designed based on demographic and local socio-economic trends. Results showed that projected water uses are not sustainable under climate change scenarios.

  7. An Overview of Power Topologies for Micro-hydro Turbines

    DEFF Research Database (Denmark)

    Nababan, Sabar; Muljadi, E.; Blaabjerg, Frede

    2012-01-01

    This paper is an overview of different power topologies of micro-hydro turbines. The size of micro-hydro turbine is typically under 100kW. Conventional topologies of micro-hydro power are stand-alone operation used in rural electrical network in developing countries. Recently, many of micro-hydro...... power generations are connected to the distribution network through power electronics (PE). This turbines are operated in variable frequency operation to improve efficiency of micro-hydro power generation, improve the power quality, and ride through capability of the generation. In this paper our...... discussion is limited to the distributed generation. Like many other renewable energy sources, the objectives of micro-hydro power generation are to reduce the use of fossil fuel, to improve the reliability of the distribution system (grid), and to reduce the transmission losses. The overview described...

  8. An investigation into the potential of low head hydro power in Northern Ireland for the production of electricity

    Science.gov (United States)

    Redpath, David; Ward, Michael J.

    2017-07-01

    The maximum exploitable potential for low head hydroelectric sites (gross head≤10 m) in Northern Ireland (NI) was determined as 12.07 MW using a simple payback analysis for 304 potential sites investigated to derive a classification scheme in terms of economic viability. A techno-economic analysis with validated numerical models from previous research estimated the capital investment required for the development of a hydroelectric plant, using the low head Michell-Banki cross flow turbine, for the 304 sites investigated. The number of potentially viable sites in NI for low head hydro ranged from 198 to 286 with an estimated installed capacity ranging from 11.95 to 12.05 MW. Sites with a limited installed capacity were not economically viable unless increased government support in the form of longer term (25-50 years) low interest loans as well as the current (Renewables Obligations Certificates) Renewables Obligation Certificates scheme is provided and sustained.

  9. [Ontario Hydro International Inc.]. Annual report 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Ontario Hydro International Inc. is the international representative of Ontario Hydro. OHII operates as a global utility that markets Ontario Hydro's services and products. Its mission is to be the leader in energy efficiency and sustainable development in the international marketplace. This report describes the year's activities in the following areas: Energy management and environment, hydroelectric generation, nuclear products and services, fossil generation, grid (transmission) business, utility management, Asia Power Group Inc. The document also includes financial highlights and international and customer contracts

  10. [The theory of the demographic transition as a reference for demo-economic models].

    Science.gov (United States)

    Genne, M

    1981-01-01

    The aim of the theory of demographic transition (TTD) is to better understand the behavior and interrelationship of economic and demographic variables. There are 2 types of demo-economic models: 1) the malthusian models, which consider demographic variables as pure exogenous variables, and 2) the neoclassical models, which consider demographic variables as strictly endogenous. If TTD can explore the behavior of exogenous and endogenous demographic variables, it cannot demonstrate neither the relation nor the order of causality among the various demographic and economic variables, but it is simply the theoretical framework of a complex social and economic phenomenon which started in Europe in the 19th Century, and which today can be extended to developing countries. There are 4 stages in the TTD; the 1st stage is characterized by high levels of fecundity and mortality; the 2nd stage is characterized by high fecundity levels and declining mortality levels; the 3rd stage is characterized by declining fecundity levels and low mortality levels; the 4th stage is characterized by low fertility and mortality levels. The impact of economic variables over mortality and birth rates is evident for mortality rates, which decline earlier and at a greater speed than birth rates. According to reliable mathematical predictions, around the year 1987 mortality rates in developing countries will have reached the low level of European countries, and growth rate will be only 1.5%. If the validity of demo-economic models has not yet been established, TTD has clearly shown that social and economic development is the factor which influences demographic expansion.

  11. Joint atmospheric-terrestrial water balances for East Africa: a WRF-Hydro case study for the upper Tana River basin

    Science.gov (United States)

    Kerandi, Noah; Arnault, Joel; Laux, Patrick; Wagner, Sven; Kitheka, Johnson; Kunstmann, Harald

    2018-02-01

    For an improved understanding of the hydrometeorological conditions of the Tana River basin of Kenya, East Africa, its joint atmospheric-terrestrial water balances are investigated. This is achieved through the application of the Weather Research and Forecasting (WRF) and the fully coupled WRF-Hydro modeling system over the Mathioya-Sagana subcatchment (3279 km2) and its surroundings in the upper Tana River basin for 4 years (2011-2014). The model setup consists of an outer domain at 25 km (East Africa) and an inner one at 5-km (Mathioya-Sagana subcatchment) horizontal resolution. The WRF-Hydro inner domain is enhanced with hydrological routing at 500-m horizontal resolution. The results from the fully coupled modeling system are compared to those of the WRF-only model. The coupled WRF-Hydro slightly reduces precipitation, evapotranspiration, and the soil water storage but increases runoff. The total precipitation from March to May and October to December for WRF-only (974 mm/year) and coupled WRF-Hydro (940 mm/year) is closer to that derived from the Climate Hazards Group Infrared Precipitation with Stations (CHIRPS) data (989 mm/year) than from the TRMM (795 mm/year) precipitation product. The coupled WRF-Hydro-accumulated discharge (323 mm/year) is close to that observed (333 mm/year). However, the coupled WRF-Hydro underestimates the observed peak flows registering low but acceptable NSE (0.02) and RSR (0.99) at daily time step. The precipitation recycling and efficiency measures between WRF-only and coupled WRF-Hydro are very close and small. This suggests that most of precipitation in the region comes from moisture advection from the outside of the analysis domain, indicating a minor impact of potential land-precipitation feedback mechanisms in this case. The coupled WRF-Hydro nonetheless serves as a tool in quantifying the atmospheric-terrestrial water balance in this region.

  12. Multi-Hydro: a multi module physically based model to evaluate effect of implementation of the flood resilience measure.

    Science.gov (United States)

    Giangola-Murzyn, A.; Gires, A.; Richard, J.; Tchiguirinskaia, I.; Schertzer, D.

    2012-04-01

    Nowadays cities are rapidly growing, gradually transforming the nearby rural area into peri-urban area where the urbanization rate increases again and again. Many of these areas are located in the floodplain. In this context and to facilitate the choice of the protection measure of the building of these areas, the European SMARTeST project (Smart Resilient Technologies and System Tools) aims to create a guideline regrouping the different existing system and their conditions of use for different situations. In this context, the Multi-Hydro model was improved and tested to evaluate the effect of the implementation of the flood resilience measures. This model consists of a coupling between different modules relying on existing and validated hydrological and physically based models for runoff processes, sewer system discharge and subsurface processes. The basic data are rainfall and GIS data of elevation, land use or soil description. However, the data necessary to perform this type of model can be difficult to access. These missing data, which can be evaluated by average values, can cause inaccuracies in the simulated water levels. But if the water level cannot yet able to be connected to survey measurements, the location of this water is very useful to understand the hydrological behavior of the study area. The ability to circle the missing data enables the portability of the model, which is a major advantage for the SMARTeST project. Multi-Hydro can be thus a tool useable by all project partners. The model was implemented on a case study of the Paris area, the city of Villecresnes. Various scenarios in terms of implementation of protection measures are tested under a fixed rainfall scenario. The results of these simulations, analyzed as series of risk maps and by an advanced statistical analysis, show that depending on the selected measures (single barrier or perimeter), the behavior of the watershed is modified. Indeed, the modifications of the land use of the

  13. A Comparison of Off-Grid-Pumped Hydro Storage and Grid-Tied Options for an IRSOFC-HAWT Power Generator

    Directory of Open Access Journals (Sweden)

    Mahdi Majidniya

    2017-01-01

    Full Text Available An Internal Reforming Solid Oxide Fuel Cell (IRSOFC is modeled thermodynamically; a Horizontal Axis Wind Turbine (HAWT is designed; the combined IRSOFC-HAWT system should create a reliable source of electricity for the demand of a village located in Manjil, Iran. The output power of HAWT is unstable, but by controlling the fuel rate for the IRSOFC it is possible to have a stable power output from the combined system. When the electricity demand is over the peak or the wind speed is low/unstable/significantly high, the generated power may not be sufficient. To solve this problem, two scenarios are considered: connecting to the grid or using a Pumped Hydro Storage (PHS. For the second scenario, the extra produced electricity is saved when the production is more than demand and can be used when the extra power is needed. The economic analysis is done based on the economic conditions in Iran. The results will show a period of return about 9.5 and 13 years with the levelized cost of electricity about 0.0747 and 0.0882 $/kWh for the first and second scenarios, respectively. Furthermore, effects of some parameters such as the electricity price and the real interest rate are discussed.

  14. Hydro-mechanical processes

    Energy Technology Data Exchange (ETDEWEB)

    Laouafa, F.; Kazmierczak, J.B. [Institut National de l' Environnement Industriel et des Risques (INERIS), Parc Technologique ALATA, 60 - Verneuil en Halatte (France); Armand, G. [Agence Nationale pour la Gestion des Dechets Radioactifs, Lab. de Souterrain de Meuse/Haute-Marne, 55 - Bure (France); Vaunat, J. [Catalonia UPC- Technical Univ., Barcelona (Spain); Jobmann, M.; Polster, M. [DBETEC- DBE Technology GmbH, Peine (Germany); Su, K.; Lebon, P.; Plas, F.; Armand, G.; Abou-Chakra Guery, A.; Cormery, F.; Shao, J.F.; Kondo, D. [ANDRA - Agence Nationale pour la Gestion des Dechets Radioactifs, 92 - Chatenay Malabry (France); Souley, M. [Institut National de l' Environnement Industriel et des Risques (INERIS), 54 - Nancy (France); Coll, C.; Charlier, R.; Collin, F.; Gerard, P. [Liege Univ., Dept. ArGEnCo (Belgium); Xiang Ling, Li [ESV EURIDICE, SCK.CEN, Belgian Nuclear Research Centre, Mol (Belgium); Collin, F. [Liege Univ., Charge de Recherches FNRS (Belgium); Pellet, F.L.; Fabre, G. [University Joseph Fourier, Laboratory 3S-R, 38 - Grenoble (France); Garcia-Sineriz, J.L.; Rey, M. [AITEMIN - Asociacion para la Investigacion y Desarrollo Industrial de los Recursos Naturales, Madrid (Spain); Mayor, J.C. [ENRESA - Empresa Nacional des Residuos Radioactivos, Madrid (Spain); Castellanos, E.; Romero, E.; Lloret, A.; Gens, A. [Catalunya Univ. Politecnica, UPC (Spain); Villar, M.V. [CIEMAT - Centro de Investigaciones Energeticas, Medioambientales y Tecnologicas, Madrid (Spain); Chambon, R. [Laboratoire 3S, UJF-INPG-CNRS, 38 - Grenoble (France); Czaikowski, O.; Lux, K.H. [Clausthal Univ. of Technology, Professorship for Waste Disposal and Geomechanics, Clausthal-Zellerfeld (Germany); Van Geet, M.; Bastiaens, W.; Volckaert, G.; Weetjens, E.; Sillen, X. [SCK-CEN, Waste and Disposal dept., Mol (Belgium); ONDRAF/NIRAS, Brussel (Belgium); Imbert, Ch. [CEA Saclay, Dept. de Physico-Chimie (DPC/SCCME/LECBA), 91 - Gif sur Yvette (France)] [and others

    2007-07-01

    This session gathers 13 articles dealing with: three-dimensional and time stepping modelling of the whole Meuse/Haute-Marne ANDRA URL (F. Laouafa, J.B. Kazmierczak, G. Armand, J. Vaunat, M. Jobmann, M. Polster); a constitutive model for a deep argillaceous rock using Hoek-Brown criteria (K. Su, C. Chavant, M. Souley); the long term behaviour of the Boom clay: influence of viscosity on the pore pressure distribution (C. Coll, R. Charlier, X.L. Li, F. Collin); the microstructural changes induced by viscoplastic deformations in argillaceous rocks (F.L. Pellet, G. Fabre, K. Su, P. Lebon); the engineered barrier experiment at Mont Terri rock laboratory (J.L. Garcia-Sineriz, M. Rey, J.C. Mayor); the chemical influence on the Hydro-Mechanical behaviour of high-density FEBEX bentonite (E. Castellanos, M.V. Villar, E. Romero, A. Lloret, A. Gens); the influence of water exchanges on the gallery convergence (P. Gerard, R. Charlier, R. Chambon, F. Collin); a new method for ageing resistant storage of argillaceous rock samples to achieve reproducible experimental results even after long intermediate storage times (O. Czaikowski, K.H. Lux); the installation and evaluation of a large-scale in-situ shaft seal experiment in Boom clay the RESEAL project M. Van Geet, W. Bastiaens, G. Volckaert, E. Weetjens, X. Sillen, A. Gens, M.V. Villar, Ch. Imbert, M. Filippi, F. Plas); the hydro-Mechanical response of the Callovo-Oxfordian mud-stone around a deep vertical drift (J. Vaunat, B. Garitte, A. Gens, K. Su, G. Armand); the sensitivity of total stress to changes in externally applied water pressure in KBS-3 buffer bentonite (J.F. Harrington, D.J. Birchall, P. Sellin); the comparison of the poro-elastic behavior of Meuse/Haute Marne and Tournemire argillites: effect of loading and saturation states (E. Bemer, A. Noiret, F. Homand, A. Rejeb); and the multi-scale modelling of the argillites mechanical behaviour (A. Abou-Chakra Guery, F. Cormery, K. Su, J.F. Shao, D. Kondo)

  15. Volume reduction/solidification of liquid radioactive waste using bitumen at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    International Nuclear Information System (INIS)

    Day, J.E.; Baker, R.L.

    1995-01-01

    Ontario Hydro at the Bruce Nuclear Generating Station 'A' has undertaken a program to render the station's liquid radioactive waste suitable for discharge to Lake Huron by removing sufficient radiological and chemical contaminants to satisfy regulatory requirements for emissions. The system will remove radionuclide and chemical contaminants from five different plant waste streams. The contaminants will be immobilized and stored at on-site radioactive waste storage facilities and the purified streams will be discharged. The discharge targets established by Ontario Hydro are set well below the limits established by the Ontario Ministry of Environment (MOE) and are based on the Best Available Technology Economically Achievable Approach (B.A.T.E.A.). ADTECHS Corporation has been selected by Ontario Hydro to provide volume reduction/solidification technology for one of the five waste streams. The system will dry and immobilize the contaminants from a liquid waste stream in emulsified asphalt using thin film evaporation technology

  16. Exploration of hydro-geomorphological indices for coastal floodplain ...

    African Journals Online (AJOL)

    Flood is a reoccurring natural hazard in many parts of Nigeria, and is likely to increase in severity and frequency. Characterization of recently flooded areas was carried out using hydro-morphological indices to identify flood prone areas. In flood risk quantification and identification, hydrodynamic models require vast ...

  17. Himalayan hydro on the horizon

    International Nuclear Information System (INIS)

    Sharp, Timothy

    2000-01-01

    The prospects for development of hydro in the Himalayas has been enhanced by privatisation and the urgent need for clean electricity in the north of India. There are various hurdles to be overcome before the projects are likely to move forward in earnest before 2005, and these are mentioned. The demand for electricity in India is said to be enormous. At present, there is much polluting industry along the Himalayas. As throughout the Indian privatisation dilemma, the critical issues for development of Himalayan hydro come down to credible commercial power markets and finance. With regard to finance and administrative changes, the Indian government is carrying out a number of actions and these are itemised. The US is vigorously promoting the development of Himalayan hydro as a key to much needed regional co-operation and the World Bank is supportive

  18. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  19. Coupled hydro-thermo-mechanical modeling of hydraulic fracturing in quasi-brittle rocks using BPM-DEM

    Directory of Open Access Journals (Sweden)

    Ingrid Tomac

    2017-02-01

    Full Text Available This paper presents an improved understanding of coupled hydro-thermo-mechanical (HTM hydraulic fracturing of quasi-brittle rock using the bonded particle model (BPM within the discrete element method (DEM. BPM has been recently extended by the authors to account for coupled convective–conductive heat flow and transport, and to enable full hydro-thermal fluid–solid coupled modeling. The application of the work is on enhanced geothermal systems (EGSs, and hydraulic fracturing of hot dry rock (HDR is studied in terms of the impact of temperature difference between rock and a flowing fracturing fluid. Micro-mechanical investigation of temperature and fracturing fluid effects on hydraulic fracturing damage in rocks is presented. It was found that fracture is shorter with pronounced secondary microcracking along the main fracture for the case when the convective–conductive thermal heat exchange is considered. First, the convection heat exchange during low-viscosity fluid infiltration in permeable rock around the wellbore causes significant rock cooling, where a finger-like fluid infiltration was observed. Second, fluid infiltration inhibits pressure rise during pumping and delays fracture initiation and propagation. Additionally, thermal damage occurs in the whole area around the wellbore due to rock cooling and cold fluid infiltration. The size of a damaged area around the wellbore increases with decreasing fluid dynamic viscosity. Fluid and rock compressibility ratio was found to have significant effect on the fracture propagation velocity.

  20. ExternE - valuation of hydro power in Klippen. Final report

    International Nuclear Information System (INIS)

    Nilsson, Maans

    1998-08-01

    ExternE is a pan E uropean project aimed at identifying and quantifying external effects from different energy production technologies around Europe. The Swedish implementation carried out case studies on a biomass plant, a coal plant and a hydro power plant. The conventional approach within the ExternE project is to estimate impacts for each priority pathway associated with the fuel cycle, and then economic methods to obtain estimates for the economic damage of each particular impact pathway. However, in the case of hydro power, it is generally not possible to estimate the most important impacts quantitatively. Therefore, a contingent valuation (CV) study was initiated. In a typical CV-study, a selection of individuals are asked to state their willingness to pay for a certain environmental improvement or to avoid an environmental damage. Welfare economic theory suggests that the well-being effects on people from a change from one situation to another can be measured as their willingness to pay or to accept an economic transaction for this change. Environmental services, such as those provided by a river system, are public services and have generally no market price, but the analyst can use people's stated preferences to determine the correct prices of environmental goods and services. The CV study was initiated to obtain an externality value for Klippens Kraftstation. The performed study was of Ex Ante type, which means estimating the values before the exploitation. For this purpose, a site similar to Klippen but without exploitation, was selected: Vojmaan. Three groups of respondents; the local population, the tourists, and the average Swede, were asked to state their perspective on hydro power development their WTP for preserving Vojmaan in its current condition. The results indicate that Locals and Tourists differ significantly from Swedes. The average willingness to pay is calculated from the respondents who absolutely will pay, and those who maybe pay. The

  1. Assessment of small versus large hydro-power developments - a Norwegian case study

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Tor Haakon; Harby, Atle

    2010-07-01

    Full text: The era of new, large hydro-power development projects seems to be over in Norway. Partly as a response to this, a large number of applications for the development of smallscale hydro power projects up to 10 MW overflow the Water Resources and Energy Directorate, resulting in an extensive development of small tributaries and water courses in Norway. This study has developed a framework for the assessment and comparison of several small versus many large hydro-power projects based on a multi-criteria analysis (MCA) approach, and further tested this approach on planned or developed projects in the Helgeland region, Norway. Multi-criteria analysis is a decision-support tool aimed at providing a systematic approach for the comparison of various alternatives with often non-commensurable and conflicting attributes. At the same time, the technique enables complex problems and various alternatives to be assessed in a transparent and simple way. The MCA-software was in our case equipped with 2 overall criteria (objectives) with a number of sub criteria; Production with sub-criteria like volume of energy production, installed effect, storage capacity and economical profit; Environmental impacts with sub-criteria like fishing interests, biodiversity, protection of unexploited nature The data used in the case study is based on the planned development of Vefsna (large project) with the energy/effect production estimated and the environmental impacts identified as part of the feasibility studies (the project never reached the authorities' licensing system with a formal EIA). The small-scale hydro-power projects used for comparison are based on realized projects in the Helgeland region and a number of proposed projects, up scaled to the size of the proposed Vefsna-development. The results from the study indicate that a large number of small-scale hydro-power projects need to be implemented in order to balance the volume of produced electricity/effect from one

  2. Ontario Hydro decontamination experience

    Energy Technology Data Exchange (ETDEWEB)

    Lacy, C S; Patterson, R W; Upton, M S [Chemistry and Metallurgy Department, Central Production Services, Ontario Hydro, ON (Canada)

    1991-04-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  3. Ontario Hydro decontamination experience

    International Nuclear Information System (INIS)

    Lacy, C.S.; Patterson, R.W.; Upton, M.S.

    1991-01-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  4. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  5. Collision data involving hydro-carbon molecules

    International Nuclear Information System (INIS)

    Tawara, H.; Itikawa, Y.; Nishimura, H.; Tanaka, H.; Nakamura, Y.

    1990-07-01

    Hydro-carbon molecules are abundantly produced when graphites are used as internal wall materials of hydrogen plasmas and strongly influence properties of low temperature plasmas near the edges as well as those of high temperature plasmas at the center. In this report, following simple description of the production mechanisms of hydro-carbon molecules under the interactions between graphite and hydrogen plasma, the present status of collision data for hydro-carbon molecules by electron impact is discussed and the relevant data are summarized in a series of figures and tables. It should also be noted that, in addition to fusion plasmas, these hydrocarbon data compiled here are quite useful in other applications such as plasma chemistry and material processing. (author)

  6. A Pedagogical Note on Modeling the Economic Benefit of Emissions Abatement vs. the Economic Harm from Emissions

    OpenAIRE

    Christopher S. Decker

    2012-01-01

    The number of undergraduate-level textbooks on environmental economics has increased in recent years, but the textbook treatment of optimal emissions (abatement) varies markedly from textbook to textbook. In particular, there is no consensus as to whether to model the economic “bad” (i.e. emissions) or the economic “good” (abatement). This inconsistency can lead to some needless confusion for students introduced to environmental economics for the first time, particularly those students outsid...

  7. The Manitoba Hydro-Electric Board 50. annual report

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs

  8. The Manitoba Hydro-Electric Board 50. annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs.

  9. Analysis of Current and Future Water Demands in the Upper Indus Basin under IPCC Climate and Socio-Economic Scenarios Using a Hydro-Economic WEAP Model

    Directory of Open Access Journals (Sweden)

    Ali Amin

    2018-04-01

    Full Text Available Pakistan is currently facing physical and economic water scarcity issues that are further complicated by the rapid increase in its population and by climate change. Many studies have focused on the physical water scarcity using hydrological modeling and the measurement of the impact of climate change on water resources in the Upper Indus Basin (UIB. However, few studies have concentrated on the importance of the economic water scarcity, that is, the water management issue under the looming impacts of climate change and the population explosion of Pakistan. The purpose of this study is to develop a management strategy which helps to achieve water security and sustainability in the Upper Indus Basin (UIB with the help of different socio-economic and climate change scenarios using WEAP (Water Evaluation and Planning modeling. The streamflow data of five sub-basins (Gilgit, Hunza, Shigar, Shyok, and Astore and the entire Upper Indus Basin (UIB were calibrated (2006–2010 and validated (2011–2014 in the WEAP model. The coefficient of determination and Nash Sutcliffe values for the calibration period ranged from 0.81–0.96. The coefficient of determination and the Nash Sutcliffe values for the validation period ranged from 0.85–0.94. After the development of the WEAP model, the analysis of the unmet water demand and percent coverage of the water demand for the period of 2006–2050 was computed. Different scenarios were generated for external driving factors (population growth, urbanization, and living standards and the impact of climate change to evaluate their effect on the current water supply system. The results indicated that the future unmet water demand is likely to reach 134 million cubic meters (mcm by the year 2050 and that the external driving factors are putting more pressure on the supply service. This study further explores the importance of proposed dams (likely to be built until 2025 by WAPDA (Water and Power Development

  10. Ontario hydro waste storage concepts and facilities

    International Nuclear Information System (INIS)

    Carter, T.J.; Mentes, G.A.

    1976-01-01

    Ontario Hydro presently operates 2,200 MWe of CANDU heavy water reactors with a further 11,000 MWe under design or construction. The annual quantities of low and medium level solid wastes expected to be produced at these stations are tabulated. In order to manage these wastes, Ontario Hydro established a Radioactive Waste Operations Site within the Bruce Nuclear Power Development located on Lake Huron about 250 km northwest of Toronto. The Waste Operations Site includes a 19-acre Storage Site plus a Radioactive Waste Volume Reduction Facility consisting of an incinerator and waste compactor. Ontario has in use or under construction both in-ground and above-ground storage facilities. In-ground facilities have been used for a number of years while the above-ground facilities are a more recent approach. Water, either in the form of precipitation, surface or subsurface water, presents the greatest concern with respect to confinement integrity and safe waste handling and storage operations

  11. Development of Hydro-Mechanical Deep Drawing

    DEFF Research Database (Denmark)

    Zhang, Shi-Hong; Danckert, Joachim

    1998-01-01

    The hydro-mechanical deep-drawing process is reviewed in this article. The process principles and features are introduced and the developments of the hydro-mechanical deep-drawing process in process performances, in theory and in numerical simulation are described. The applications are summarized....... Some other related hydraulic forming processes are also dealt with as a comparison....

  12. An Integrated Hydro-Economic Modelling Framework to Evaluate Water Allocation Strategies II: Scenario Assessment

    NARCIS (Netherlands)

    George, B.; Malano, H.; Davidson, B.; Hellegers, P.J.G.J.; Bharati, L.; Sylvain, M.

    2011-01-01

    In this paper the results of an assessment of the hydrological and economic implications of reallocating water in the Musi sub-basin, a catchment within the Krishna Basin in India, are reported. Policy makers identified a number of different but plausible scenarios that could apply in the sub-basin,

  13. Value of pumped hydro storage in a hybrid energy generation and allocation system

    International Nuclear Information System (INIS)

    Kocaman, Ayse Selin; Modi, Vijay

    2017-01-01

    Highlights: •We propose a two-stage stochastic mixed-integer programming model for a hybrid energy system. •We investigate the solar and PHES integration considering the streamflow uncertainty. •We study the benefit of PHES system over conventional hydropower systems to support solar. •We examine the role of PHES systems in both isolated and connected systems. -- Abstract: Transition from fossil fuels to renewable sources is inevitable. In this direction, variation and intermittency of renewables can be integrated into the grid by means of hybrid systems that operate as a combination of alternative resources, energy storage and long distance transmission lines. In this study, we propose a two-stage stochastic mixed-integer programming model for sizing an integrated hybrid energy system, in which intermittent solar generation in demand points is supported by pumped hydro storage (PHES) systems and diesel is used as an expensive back-up source. PHES systems work as a combination of pumped storage and conventional hydropower stations since there is also natural streamflow coming to the upper reservoirs that shows significant seasonal and inter-annual variability and uncertainty. With several case studies from India, we examine the role of high hydropower potential in the Himalaya Mountains to support solar energy generation in the form of pumped hydro or conventional hydro system while meeting the demand at various scales. We show that pumped hydro storage can keep the diesel contribution to meet the demand less than 10%, whereas this number can go up to more than 50% for conventional systems where the streamflow potential is limited compared to the demand. We also examine the role of pumped hydro systems in both isolated and connected systems (through inter-regional transmission lines) and show that the benefit of pumped hydro is more significant in isolated systems and resource-sharing in connected systems can substitute for energy storage. In addition, with

  14. HydroDesktop: An Open Source GIS-Based Platform for Hydrologic Data Discovery, Visualization, and Analysis

    Science.gov (United States)

    Ames, D. P.; Kadlec, J.; Cao, Y.; Grover, D.; Horsburgh, J. S.; Whiteaker, T.; Goodall, J. L.; Valentine, D. W.

    2010-12-01

    A growing number of hydrologic information servers are being deployed by government agencies, university networks, and individual researchers using the Consortium of Universities for the Advancement of Hydrologic Science, Inc. (CUAHSI) Hydrologic Information System (HIS). The CUAHSI HIS Project has developed a standard software stack, called HydroServer, for publishing hydrologic observations data. It includes the Observations Data Model (ODM) database and Water Data Service web services, which together enable publication of data on the Internet in a standard format called Water Markup Language (WaterML). Metadata describing available datasets hosted on these servers is compiled within a central metadata catalog called HIS Central at the San Diego Supercomputer Center and is searchable through a set of predefined web services based queries. Together, these servers and central catalog service comprise a federated HIS of a scale and comprehensiveness never previously available. This presentation will briefly review/introduce the CUAHSI HIS system with special focus on a new HIS software tool called "HydroDesktop" and the open source software development web portal, www.HydroDesktop.org, which supports community development and maintenance of the software. HydroDesktop is a client-side, desktop software application that acts as a search and discovery tool for exploring the distributed network of HydroServers, downloading specific data series, visualizing and summarizing data series and exporting these to formats needed for analysis by external software. HydroDesktop is based on the open source DotSpatial GIS developer toolkit which provides it with map-based data interaction and visualization, and a plug-in interface that can be used by third party developers and researchers to easily extend the software using Microsoft .NET programming languages. HydroDesktop plug-ins that are presently available or currently under development within the project and by third party

  15. BC Hydro shops for GHG offsets

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    BC Hydro is reported to have offered to purchase one million tonnes of carbon dioxide reductions in Canada's Greenhouse Gas Emissions Reduction Trading program (GERT). The program uses a baseline and credit system, where emitters purchase measurable quantities of site-specific GHG reductions. Since mid-1998, the program registered five bilateral trades and seven offers to sell. BC Hydro's recent offer is the first offer to buy. BC Hydro has made the offer to buy in expectation of the introduction of the start of the Kyoto Protocol reductions, and expects to be in the game for some time to come if it is to meet its obligations under the Kyoto Protocol. Preference will be given to projects located in Canada, but BC Hydro will consider reductions created anywhere in the world. The financial range of a single trade is between $50,000 and $1 million. (GHG offsets are currently trading in North America for between $.50 and $3.00 Cdn per metric tonne of carbon dioxide equivalent.) At present, offsets are selling at a heavily discounted price because of the uncertainty that investments made now will be credited against future regulations curbing emitters. Consequently, buying now while prices are low, may lead to sizable benefits later, depending on the actual regulations when they are promulgated. Trading now will also give BC Hydro greater credibility and assurance to have its voice heard when discussions about emissions trading and the implementation of emission trading rules reaches the serious stage

  16. Central Asia Water (CAWa) - A visualization platform for hydro-meteorological sensor data

    Science.gov (United States)

    Stender, Vivien; Schroeder, Matthias; Wächter, Joachim

    2014-05-01

    Water is an indispensable necessity of life for people in the whole world. In central Asia, water is the key factor for economic development, but is already a narrow resource in this region. In fact of climate change, the water problem handling will be a big challenge for the future. The regional research Network "Central Asia Water" (CAWa) aims at providing a scientific basis for transnational water resources management for the five Central Asia States Kyrgyzstan, Uzbekistan, Tajikistan, Turkmenistan and Kazakhstan. CAWa is part of the Central Asia Water Initiative (also known as the Berlin Process) which was launched by the Federal Foreign Office on 1 April 2008 at the "Water Unites" conference in Berlin. To produce future scenarios and strategies for sustainable water management, data on water reserves and the use of water in Central Asia must therefore be collected consistently across the region. Hydro-meteorological stations equipped with sophisticated sensors are installed in Central Asia and send their data via real-time satellite communication to the operation centre of the monitoring network and to the participating National Hydro-meteorological Services.[1] The challenge for CAWa is to integrate the whole aspects of data management, data workflows, data modeling and visualizations in a proper design of a monitoring infrastructure. The use of standardized interfaces to support data transfer and interoperability is essential in CAWa. An uniform treatment of sensor data can be realized by the OGC Sensor Web Enablement (SWE) , which makes a number of standards and interface definitions available: Observation & Measurement (O&M) model for the description of observations and measurements, Sensor Model Language (SensorML) for the description of sensor systems, Sensor Observation Service (SOS) for obtaining sensor observations, Sensor Planning Service (SPS) for tasking sensors, Web Notification Service (WNS) for asynchronous dialogues and Sensor Alert Service

  17. Times are changing, Hydro-Quebec multiplies its assets

    International Nuclear Information System (INIS)

    Lefevre, M.

    1997-01-01

    Hydro-Quebec''s advance into the North American and world multi-energy market began with the purchase of an interest in the natural gas holding company Noverco, a commercial partnership with Gaz de France, and marketing agreements with Enron and Trigen in the United States. Hydro-Quebec, the world''s sixth largest electric utility, aims to become a multi-energy enterprise selling not only electricity, but also natural gas, oil and certain renewable forms of energy. Currently, Hydro-Quebec is licensed to make border sales of electricity at regulated prices. Through the US Federal Energy Regulatory Commission (FERC), Hydro-Quebec will be able also to sell electricity through wholesale spot contracts with electricity marketers such as Trigen and Enron

  18. A hybrid wavelet de-noising and Rank-Set Pair Analysis approach for forecasting hydro-meteorological time series.

    Science.gov (United States)

    Wang, Dong; Borthwick, Alistair G; He, Handan; Wang, Yuankun; Zhu, Jieyu; Lu, Yuan; Xu, Pengcheng; Zeng, Xiankui; Wu, Jichun; Wang, Lachun; Zou, Xinqing; Liu, Jiufu; Zou, Ying; He, Ruimin

    2018-01-01

    Accurate, fast forecasting of hydro-meteorological time series is presently a major challenge in drought and flood mitigation. This paper proposes a hybrid approach, wavelet de-noising (WD) and Rank-Set Pair Analysis (RSPA), that takes full advantage of a combination of the two approaches to improve forecasts of hydro-meteorological time series. WD allows decomposition and reconstruction of a time series by the wavelet transform, and hence separation of the noise from the original series. RSPA, a more reliable and efficient version of Set Pair Analysis, is integrated with WD to form the hybrid WD-RSPA approach. Two types of hydro-meteorological data sets with different characteristics and different levels of human influences at some representative stations are used to illustrate the WD-RSPA approach. The approach is also compared to three other generic methods: the conventional Auto Regressive Integrated Moving Average (ARIMA) method, Artificial Neural Networks (ANNs) (BP-error Back Propagation, MLP-Multilayer Perceptron and RBF-Radial Basis Function), and RSPA alone. Nine error metrics are used to evaluate the model performance. Compared to three other generic methods, the results generated by WD-REPA model presented invariably smaller error measures which means the forecasting capability of the WD-REPA model is better than other models. The results show that WD-RSPA is accurate, feasible, and effective. In particular, WD-RSPA is found to be the best among the various generic methods compared in this paper, even when the extreme events are included within a time series. Copyright © 2017 Elsevier Inc. All rights reserved.

  19. Economic modeling of HIV treatments.

    Science.gov (United States)

    Simpson, Kit N

    2010-05-01

    To review the general literature on microeconomic modeling and key points that must be considered in the general assessment of economic modeling reports, discuss the evolution of HIV economic models and identify models that illustrate this development over time, as well as examples of current studies. Recommend improvements in HIV economic modeling. Recent economic modeling studies of HIV include examinations of scaling up antiretroviral (ARV) in South Africa, screening prior to use of abacavir, preexposure prophylaxis, early start of ARV in developing countries and cost-effectiveness comparisons of specific ARV drugs using data from clinical trials. These studies all used extensively published second-generation Markov models in their analyses. There have been attempts to simplify approaches to cost-effectiveness estimates by using simple decision trees or cost-effectiveness calculations with short-time horizons. However, these approaches leave out important cumulative economic effects that will not appear early in a treatment. Many economic modeling studies were identified in the 'gray' literature, but limited descriptions precluded an assessment of their adherence to modeling guidelines, and thus to the validity of their findings. There is a need for developing third-generation models to accommodate new knowledge about adherence, adverse effects, and viral resistance.

  20. A hydro-meteorological model chain to assess the influence of natural variability and impacts of climate change on extreme events and propose optimal water management

    Science.gov (United States)

    von Trentini, F.; Willkofer, F.; Wood, R. R.; Schmid, F. J.; Ludwig, R.

    2017-12-01

    The ClimEx project (Climate change and hydrological extreme events - risks and perspectives for water management in Bavaria and Québec) focuses on the effects of climate change on hydro-meteorological extreme events and their implications for water management in Bavaria and Québec. Therefore, a hydro-meteorological model chain is applied. It employs high performance computing capacity of the Leibniz Supercomputing Centre facility SuperMUC to dynamically downscale 50 members of the Global Circulation Model CanESM2 over European and Eastern North American domains using the Canadian Regional Climate Model (RCM) CRCM5. Over Europe, the unique single model ensemble is conjointly analyzed with the latest information provided through the CORDEX-initiative, to better assess the influence of natural climate variability and climatic change in the dynamics of extreme events. Furthermore, these 50 members of a single RCM will enhance extreme value statistics (extreme return periods) by exploiting the available 1500 model years for the reference period from 1981 to 2010. Hence, the RCM output is applied to drive the process based, fully distributed, and deterministic hydrological model WaSiM in high temporal (3h) and spatial (500m) resolution. WaSiM and the large ensemble are further used to derive a variety of hydro-meteorological patterns leading to severe flood events. A tool for virtual perfect prediction shall provide a combination of optimal lead time and management strategy to mitigate certain flood events following these patterns.

  1. Non-linear multi-objective model for planning water-energy modes of Novosibirsk Hydro Power Plant

    Science.gov (United States)

    Alsova, O. K.; Artamonova, A. V.

    2018-05-01

    This paper presents a non-linear multi-objective model for planning and optimizing of water-energy modes for the Novosibirsk Hydro Power Plant (HPP) operation. There is a very important problem of developing a strategy to improve the scheme of water-power modes and ensure the effective operation of hydropower plants. It is necessary to determine the methods and criteria for the optimal distribution of water resources, to develop a set of models and to apply them to the software implementation of a DSS (decision-support system) for managing Novosibirsk HPP modes. One of the possible versions of the model is presented and investigated in this paper. Experimental study of the model has been carried out with 2017 data and the task of ten-day period planning from April to July (only 12 ten-day periods) was solved.

  2. Ontario hydro radioactive material transportation field guide

    International Nuclear Information System (INIS)

    Howe, W.

    1987-01-01

    The recent introduction of both the AECB Transport Packaging of Radioactive Material Regulations and Transport Canada's Transportation of Dangerous Goods Regulations have significantly altered the requirements for transporting radioactive material in Canada. Extensive additional training as well as certification of several hundred Ontario Hydro employees has been necessary to ensure compliance with the additional and revised regulatory requirements. To assist in the training of personnel, an 'active' corporate Ontario Hydro Field Guide for Radioactive Material Transport document has been developed and published. The contents of this Field Guide identify current Ontario Hydro equipment and procedures as well as the updated relevant regulatory requirements within Canada. In addition, to satisfying Ontario Hydro requirements for this type of information over two thousand of these Field Guides have been provided to key emergency response personnel throughout the province of Ontario to assist in their transportation accident response training

  3. Mechatronics in compressor valves - experience with HydroCOM; Mechatronik in Kompressorventilen - Betriebserfahrungen mit HydroCOM

    Energy Technology Data Exchange (ETDEWEB)

    Rumpold, A. [Hoerbiger Ventilwerke GmbH, Wien (Austria)

    2000-03-01

    Optimisation of fluid flow rates is indispensable in piston compressor operation. Messrs. Hoerbiger are producers of continuous control elements which combine mechanical and electronic components. Applications and examples of the HydroCOM control system are presented. High availability permits servicing intervals around 160,000 hours of operation. The longer operating time will improve the competitive standing of piston compressors as compared to turbocompressors and screw compressors. [German] Fuer den Betrieb von Kolbenkompressoren ist eine optimale Liefermengenregelung unverzichtbarer Bestandteil. Im Gegensatz zu herkoemmlichen Verfahren hat Hoerbiger vor zwei Jahren durch die Kombination von Mechanik und Elektronik eine neue Generation von stufenlosen Mengenregelungen auf den Markt gebracht. Anwendungsbeispiele und Betriebserfahrungen mit der HydroCOM Regelung werden vorgestellt. Hohe Verfuegbarkeit erlaubt Wartungsintervalle fuer HydroCOM Aktuatoren von ca. 16000 Betriebsstunden. Und aufgrund der generell verbesserten Standzeiten von Packungen, Kolbenringen und Ventilen erzielt der so geregelte Kolbenkompressor hohe Attraktivitaet gegenueber Turbo- und Schraubenverdichtern. (orig./AKF)

  4. Volume reduction/solidification of liquid radioactive waste using bitumen at Ontario hydro's Bruce nuclear generating station open-quotes Aclose quotes

    International Nuclear Information System (INIS)

    Day, J.E.; Baker, R.L.

    1994-01-01

    Ontario Hydro at the Bruce Nuclear Generating Station open-quotes Aclose quotes has undertaken a program to render the station's liquid radioactive waste suitable for discharge to Lake Huron by removing sufficient radiological and chemical contaminants from five different plant waste streams. The contaminants will be immobilized and stored at on-site radioactive waste storage facilities and the purified streams will be discharged. The discharge targets established by Ontario Hydro are set well below the limits established by the Ontario Ministry of Environment (MOE) and are based on the Best Available Technology Economically Achievable Approach (B.A.T.E.A.). ADTECHS Corporation has been selected by Ontario Hydro to provide volume reduction/solidification technology for one of the five waste streams. The system will dry and immobilize the contaminants from a liquid waste stream in emulsified asphalt using thin film evaporation technology

  5. Temporal variations of NDVI and correlations between NDVI and hydro-climatological variables at Lake Baiyangdian, China.

    Science.gov (United States)

    Wang, Fei; Wang, Xuan; Zhao, Ying; Yang, Zhifeng

    2014-09-01

    In this paper, correlations between vegetation dynamics (represented by the normalized difference vegetation index (NDVI)) and hydro-climatological factors were systematically studied in Lake Baiyangdian during the period from April 1998 to July 2008. Six hydro-climatological variables including lake volume, water level, air temperature, precipitation, evaporation, and sunshine duration were used, as well as extracted NDVI series data representing vegetation dynamics. Mann-Kendall tests were used to detect trends in NDVI and hydro-climatological variation, and a Bayesian information criterion method was used to detect their abrupt changes. A redundancy analysis (RDA) was used to determine the major hydro-climatological factors contributing to NDVI variation at monthly, seasonal, and yearly scales. The results were as follows: (1) the trend analysis revealed that only sunshine duration significantly increased over the study period, with an inter-annual increase of 3.6 h/year (p NDVI trends were negligible; (2) the abrupt change detection showed that a major hydro-climatological change occurred in 2004, when abrupt changes occurred in lake volume, water level, and sunlight duration; and (3) the RDA showed that evaporation and temperature were highly correlated with monthly changes in NDVI. At larger time scales, however, water level and lake volume gradually became more important than evaporation and precipitation in terms of their influence on NDVI. These results suggest that water availability is the most important factor in vegetation restoration. In this paper, we recommend a practical strategy for lake ecosystem restoration that takes into account changes in NDVI.

  6. Mini hydro electric power stations Lukar 1,2,3,4: Public enterprise (JP) Komunalec

    International Nuclear Information System (INIS)

    Stojanova, Blagica

    2004-01-01

    The role of the Public enterprises in improving entire living conditions of the citizens, not only by its services towards the citizenship such as: water supplying and public hygiene but the opportunity to produce the electric power by the Mini hydro electric-power stations built on the main city water supply pipes. The paper presents experiences of building the mini hydro electric power stations Lukar 1,2,3,4. The successful completion of this project should be a motivation for building more electric power stations because there are great water potential in the Republic of Macedonia i.e. there have been recorded more than a hundred places suitable for construction of power electric stations. This will contribute not only for clean ecological energy but will have a direct influence on the total economic development of the Republic of Macedonia. (Author)

  7. Modeling post-fire hydro-geomorphic recovery in the Waldo Canyon Fire

    Science.gov (United States)

    Kinoshita, Alicia; Nourbakhshbeidokhti, Samira; Chin, Anne

    2016-04-01

    Wildfire can have significant impacts on watershed hydrology and geomorphology by changing soil properties and removing vegetation, often increasing runoff and soil erosion and deposition, debris flows, and flooding. Watershed systems may take several years or longer to recover. During this time, post-fire channel changes have the potential to alter hydraulics that influence characteristics such as time of concentration and increase time to peak flow, flow capacity, and velocity. Using the case of the 2012 Waldo Canyon Fire in Colorado (USA), this research will leverage field-based surveys and terrestrial Light Detection and Ranging (LiDAR) data to parameterize KINEROS2 (KINematic runoff and EROSion), an event oriented, physically-based watershed runoff and erosion model. We will use the Automated Geospatial Watershed Assessment (AGWA) tool, which is a GIS-based hydrologic modeling tool that uses commonly available GIS data layers to parameterize, execute, and spatially visualize runoff and sediment yield for watersheds impacted by the Waldo Canyon Fire. Specifically, two models are developed, an unburned (Bear Creek) and burned (Williams) watershed. The models will simulate burn severity and treatment conditions. Field data will be used to validate the burned watersheds for pre- and post-fire changes in infiltration, runoff, peak flow, sediment yield, and sediment discharge. Spatial modeling will provide insight into post-fire patterns for varying treatment, burn severity, and climate scenarios. Results will also provide post-fire managers with improved hydro-geomorphic modeling and prediction tools for water resources management and mitigation efforts.

  8. ECONOMIC MODELING PROCESSES USING MATLAB

    Directory of Open Access Journals (Sweden)

    Anamaria G. MACOVEI

    2008-06-01

    Full Text Available To study economic phenomena and processes using mathem atical modeling, and to determine the approximatesolution to a problem we need to choose a method of calculation and a numerical computer program, namely thepackage of programs MatLab. Any economic process or phenomenon is a mathematical description of h is behavior,and thus draw up an economic and mathematical model that has the following stages: formulation of the problem, theanalysis process modeling, the production model and design verification, validation and implementation of the model.This article is presented an economic model and its modeling is using mathematical equations and software packageMatLab, which helps us approximation effective solution. As data entry is considered the net cost, the cost of direct andtotal cost and the link between them. I presented the basic formula for determining the total cost. Economic modelcalculations were made in MatLab software package and with graphic representation of its interpretation of the resultsachieved in terms of our specific problem.

  9. Economic modelling for life extension decision making

    International Nuclear Information System (INIS)

    Farber, M.A.; Harrison, D.L.; Carlson, D.D.

    1987-01-01

    This paper presents a methodology for the economic and financial analysis of nuclear plant life extension under uncertainty and demonstrates its use in a case analysis. While the economic and financial evaluation of life extension does not require new analytical tools, such studies should be based on the following three premises. First, the methodology should examine effects at the level of the company or utility system, because the most important economic implications of life extension relate to the altered generation system expansion plan. Second, it should focus on the implications of uncertainty in order to understand the factors that most affect life extension benefits and identify risk management efforts. Third, the methodology should address multiple objectives, at a minimum, both economic and financial objectives. An analysis of the role of life extension for Virginia Power's generating system was performed using the MIDAS model, developed by the Electric Power Research Institute. MIDAS is particularly well suited to this type of study because of its decision analysis framework. The model incorporates modules for load analysis, capacity expansion, production costing, financial analysis, and rates. The decision tree structure facilitates the multiple-scenario analysis of uncertainty. The model's output includes many economic and financial measures, including capital expenditures, fuel and purchases power costs, revenue requirements, average rates, external financing requirements, and coverage ratio. Based on findings for Virginia Power's Surry 1 plant, nuclear plant life extension has economic benefits for a utility's customers and financial benefits for the utility's investors. These benefits depend on a number of economic, technical and regulatory factors. The economic analysis presented in this paper identifies many of the key factors and issues relevant to life extension planning

  10. An Economic Order Quantity Model with Completely Backordering and Nondecreasing Demand under Two-Level Trade Credit

    Directory of Open Access Journals (Sweden)

    Zohreh Molamohamadi

    2014-01-01

    Full Text Available In the traditional inventory system, it was implicitly assumed that the buyer pays to the seller as soon as he receives the items. In today’s competitive industry, however, the seller usually offers the buyer a delay period to settle the account of the goods. Not only the seller but also the buyer may apply trade credit as a strategic tool to stimulate his customers’ demands. This paper investigates the effects of the latter policy, two-level trade credit, on a retailer’s optimal ordering decisions within the economic order quantity framework and allowable shortages. Unlike most of the previous studies, the demand function of the customers is considered to increase with time. The objective of the retailer’s inventory model is to maximize the profit. The replenishment decisions optimally are obtained using genetic algorithm. Two special cases of the proposed model are discussed and the impacts of parameters on the decision variables are finally investigated. Numerical examples demonstrate the profitability of the developed two-level supply chain with backorder.

  11. Hydro turbine governor’s power control of hydroelectric unit with sloping ceiling tailrace tunnel

    Science.gov (United States)

    Fu, Liang; Wu, Changli; Tang, Weiping

    2018-02-01

    The primary frequency regulation and load regulation transient process when the hydro turbine governor is under the power mode of hydropower unit with sloping ceiling tailrace are analysed by field test and numerical simulation in this paper. A simulation method based on “three-zone model” to simulate small fluctuation transient process of the sloping ceiling tailrace is proposed. The simulation model of hydraulic turbine governor power mode is established by governor’s PLC program identification and parameter measurement, and the simulation model is verified by the test. The slow-fast-slow “three-stage regulation” method which can improve the dynamic quality of hydro turbine governor power mode is proposed. The power regulation strategy and parameters are optimized by numerical simulation, the performance of primary frequency regulation and load regulation transient process when the hydro turbine governor is under power mode are improved significantly.

  12. IPPSO raises Hydro exports in smog negotiations

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Independent Power Producers of Ontario (IPPSO) requested federal and provincial committees negotiating atmospheric emission standards to review Ontario Hydro's export wheeling plans. IPPSO alleges that Ontario Hydro is preparing to apply pressure on the Canadian export approval process, and is building up a major effort that will increase emissions, contrary to the objectives embodied in a number of environment protection projects such as the Ontario Smog Plan, The Federal-Provincial NOx Management Plan, the Strategic Options Plan, or the Convention on Long-Range Transboundary Air Pollution Draft NOx Protocol Negotiations. IPPSO alleges further that while Ontario Hydro is one of Canada's largest single emitter of greenhouse gases NOx, and SO 2 , and as a public sector corporation it should be the most amenable to serving the public good, the Corporation is doing exactly the opposite: it actively prevents production of electricity from less polluting sources. It is IPPSO's contention that Ontario Hydro's desire to control the Ontario market could come at significant cost to the environment

  13. Canadian hydro potential in the North American market

    International Nuclear Information System (INIS)

    Adams, K.

    2002-01-01

    Canada's hydro potential in the North American energy market was discussed. Canada is a net exporter of electricity in North America, and since 1990, has exported an average of 28 Terawatt hours/year to the United States. More than 65 per cent of these exports were generated from hydro power plants. It was emphasized that significant reductions in greenhouse gases can be achieved if Canadian hydroelectricity is substituted for coal power generation. It was also noted that although there may not be enough hydro capacity to meet all of North America's energy requirements, development of new large hydro resources in Canada could help meet the growing demand for electricity in the United States. Hydro can also complement other renewable energy sources such as wind and solar. The factors that will determine if Canadian hydropower will contribute to the energy demand are market mechanisms such as greenhouse gas credit trading systems which provide incentive for renewable energy projects. In addition, the existing infrastructure must be expanded both east and west within Canada and north and south between Canada and the United States. 5 figs

  14. Annual report 1993 (Ontario Hydro, Toronto)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Ontario Hydro`s prime objective is to supply the people of Ontario with electricity at cost while maintaining high standards of safety and service. The annual report presents energy efficiency and competitiveness, operations in review, the environmental performance of the Corporation, the future, and choices for a sustainable future. A financial review and analysis is also provided, along with an auditor`s report and financial statements.

  15. 76 FR 71960 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14247-000] KC Hydro LLC of..., Motions To Intervene, and Competing Applications On August 8, 2011, KC Hydro LLC of New Hampshire filed an... spillway elevation of 130 feet mean sea level (msl); (3) connecting new electrical [[Page 71961...

  16. Alexela ostab Hydro Texaco tanklaketi / Gert D. Hankewitz

    Index Scriptorium Estoniae

    Hankewitz, Gert D.

    2006-01-01

    Kütusefirma Alexela Oil teatas, et ostab tanklaketi Hydro Texaco kõik Balti riikide tanklad. Diagramm: Alexela ja Hydro Texaco majandusnäitajad. Vt. samas: Statoili juht: ühinemine turul muutusi ei too

  17. The Community Water Model (CWATM) / Development of a community driven global water model

    Science.gov (United States)

    Burek, Peter; Satoh, Yusuke; Greve, Peter; Kahil, Taher; Wada, Yoshihide

    2017-04-01

    With a growing population and economic development, it is expected that water demands will increase significantly in the future, especially in developing regions. At the same time, climate change is expected to alter spatial patterns of hydrological cycle and will have global, regional and local impacts on water availability. Thus, it is important to assess water supply, water demand and environmental needs over time to identify the populations and locations that will be most affected by these changes linked to water scarcity, droughts and floods. The Community Water Model (CWATM) will be designed for this purpose in that it includes an accounting of how future water demands will evolve in response to socioeconomic change and how water availability will change in response to climate. CWATM represents one of the new key elements of IIASA's Water program. It has been developed to work flexibly at both global and regional level at different spatial resolutions. The model is open source and community-driven to promote our work amongst the wider water community worldwide and is flexible enough linking to further planned developments such as water quality and hydro-economic modules. CWATM will be a basis to develop a next-generation global hydro-economic modeling framework that represents the economic trade-offs among different water management options over a basin looking at water supply infrastructure and demand managements. The integrated modeling framework will consider water demand from agriculture, domestic, energy, industry and environment, investment needs to alleviate future water scarcity, and will provide a portfolio of economically optimal solutions for achieving future water management options under the Sustainable Development Goals (SDG) for example. In addition, it will be able to track the energy requirements associated with the water supply system e.g., pumping, desalination and interbasin transfer to realize the linkage with the water-energy economy. In

  18. The physical and mathematical model of dynamic economic analysis and assessment for NPP

    International Nuclear Information System (INIS)

    Xu Jiming

    1992-01-01

    A set physical and mathematical model of dynamic economic analysis referring to international general sub-item and account of investment and constant money levelized model and combining current economic analysis method in China for nuclear power plant was established. The model can be used in economic analysis not only for nuclear power plant but also for coal-fired power plant and can satisfy demand of doing economic analysis and assessment for nuclear power plant and conventional power plant

  19. The HydroServer Platform for Sharing Hydrologic Data

    Science.gov (United States)

    Tarboton, D. G.; Horsburgh, J. S.; Schreuders, K.; Maidment, D. R.; Zaslavsky, I.; Valentine, D. W.

    2010-12-01

    The CUAHSI Hydrologic Information System (HIS) is an internet based system that supports sharing of hydrologic data. HIS consists of databases connected using the Internet through Web services, as well as software for data discovery, access, and publication. The HIS system architecture is comprised of servers for publishing and sharing data, a centralized catalog to support cross server data discovery and a desktop client to access and analyze data. This paper focuses on HydroServer, the component developed for sharing and publishing space-time hydrologic datasets. A HydroServer is a computer server that contains a collection of databases, web services, tools, and software applications that allow data producers to store, publish, and manage the data from an experimental watershed or project site. HydroServer is designed to permit publication of data as part of a distributed national/international system, while still locally managing access to the data. We describe the HydroServer architecture and software stack, including tools for managing and publishing time series data for fixed point monitoring sites as well as spatially distributed, GIS datasets that describe a particular study area, watershed, or region. HydroServer adopts a standards based approach to data publication, relying on accepted and emerging standards for data storage and transfer. CUAHSI developed HydroServer code is free with community code development managed through the codeplex open source code repository and development system. There is some reliance on widely used commercial software for general purpose and standard data publication capability. The sharing of data in a common format is one way to stimulate interdisciplinary research and collaboration. It is anticipated that the growing, distributed network of HydroServers will facilitate cross-site comparisons and large scale studies that synthesize information from diverse settings, making the network as a whole greater than the sum of its

  20. Coupling of HEC-HMS and HEC-ResSim in Modeling the Fluctuation of Water Level in Devils Lake Using Heterogeneous Data

    Science.gov (United States)

    Munna, H. S.; Lim, Y. H.

    2010-12-01

    Devils Lake, located in Ramsey and Benson County in North Dakota is a sub-basin of the Red River of the North. Although it lies entirely within the Red River Basin, it has no natural outlet at current water levels. Since its inception during the glacier period, Devils Lake has been either rising or falling over the last 10,000 years. Geologic evidence shows that the water level in Devils Lake has fluctuated widely from completely dry (about 1400 feet AMSL) to overflowing into the Sheyenne River (about 1459 feet AMSL). The uncontrolled growth of the lake has been an alarming issue for North Dakota for the past few years as it causes continuous flooding in the surrounding areas. A hydro-climatic model that can provide simulations of the water level of this lake for a 20 or 50 year time frame can be a useful decision making tool. In a mission to achieve that, heterogeneous data obtained from various sources were used to model the lake. Runoff from precipitation is one of the major inputs to the lake and to model that, eight major watersheds that feed directly to the lake were identified using Digital Elevation Models (DEMs) of thirty meter resolution in ArcGIS environment. Hydrology and Arc Hydro tools were used to delineate the watersheds and sub-basins to generate the runoff using the HEC HMS model. The precipitation time series data collected from both NASA and ground stations were used separately to calibrate the runoff model. The generation of time series runoff values for individual basins for four consecutive years (2001-2004) was applied into HEC-ResSim, a reservoir simulation model, to estimate the lake level series considering the elevation-area-storage relationship and evaporation series from previous USGS studies. It is eminent that seepage under the lake played a key role in calibrating the model with observed elevations. The value of seepage flow was varied over increasing elevations as it depends on the height of water column. The model showed an

  1. An Integrated Hydro-Economic Modelling Framework to Evaluate Water Allocation Strategies I: Model Development.

    NARCIS (Netherlands)

    George, B.; Malano, H.; Davidson, B.; Hellegers, P.; Bharati, L.; Sylvain, M.

    2011-01-01

    In this paper an integrated modelling framework for water resources planning and management that can be used to carry out an analysis of alternative policy scenarios for water allocation and use is described. The modelling approach is based on integrating a network allocation model (REALM) and a

  2. Using High-Resolution Data to Test Parameter Sensitivity of the Distributed Hydrological Model HydroGeoSphere

    Directory of Open Access Journals (Sweden)

    Thomas Cornelissen

    2016-05-01

    Full Text Available Parameterization of physically based and distributed hydrological models for mesoscale catchments remains challenging because the commonly available data base is insufficient for calibration. In this paper, we parameterize a mesoscale catchment for the distributed model HydroGeoSphere by transferring evapotranspiration parameters calibrated at a highly-equipped headwater catchment in addition to literature data. Based on this parameterization, the sensitivity of the mesoscale catchment to spatial variability in land use, potential evapotranspiration and precipitation and of the headwater catchment to mesoscale soil and land use data was conducted. Simulations of the mesoscale catchment with transferred parameters reproduced daily discharge dynamics and monthly evapotranspiration of grassland, deciduous and coniferous vegetation in a satisfactory manner. Precipitation was the most sensitive input data with respect to total runoff and peak flow rates, while simulated evapotranspiration components and patterns were most sensitive to spatially distributed land use parameterization. At the headwater catchment, coarse soil data resulted in a change in runoff generating processes based on the interplay between higher wetness prior to a rainfall event, enhanced groundwater level rise and accordingly, lower transpiration rates. Our results indicate that the direct transfer of parameters is a promising method to benefit highly equipped simulations of the headwater catchments.

  3. Assessing the Roles of Regional Climate Uncertainty, Policy, and Economics on Future Risks to Water Stress: A Large-Ensemble Pilot Case for Southeast Asia

    Science.gov (United States)

    Schlosser, C. A.; Strzepek, K. M.; Gao, X.; Fant, C. W.; Blanc, E.; Monier, E.; Sokolov, A. P.; Paltsev, S.; Arndt, C.; Prinn, R. G.; Reilly, J. M.; Jacoby, H.

    2013-12-01

    The fate of natural and managed water resources is controlled to varying degrees by interlinked energy, agricultural, and environmental systems, as well as the hydro-climate cycles. The need for risk-based assessments of impacts and adaptation to regional change calls for likelihood quantification of outcomes via the representation of uncertainty - to the fullest extent possible. A hybrid approach of the MIT Integrated Global System Model (IGSM) framework provides probabilistic projections of regional climate change - generated in tandem with consistent socio-economic projections. A Water Resources System (WRS) then tracks water allocation and availability across these competing demands. As such, the IGSM-WRS is an integrated tool that provides quantitative insights on the risks and sustainability of water resources over large river basins. This pilot project focuses the IGSM-WRS on Southeast Asia (Figure 1). This region presents exceptional challenges toward sustainable water resources given its texture of basins that traverse and interconnect developing nations as well as large, ascending economies and populations - such as China and India. We employ the IGSM-WRS in a large ensemble of outcomes spanning hydro-climatic, economic, and policy uncertainties. For computational efficiency, a Gaussian Quadrature procedure sub-samples these outcomes (Figure 2). The IGSM-WRS impacts are quantified through frequency distributions of water stress changes. The results allow for interpretation of: the effects of policy measures; impacts on food production; and the value of design flexibility of infrastructure/institutions. An area of model development and exploration is the feedback of water-stress shocks to economic activity (i.e. GDP and land use). We discuss these further results (where possible) as well as other efforts to refine: uncertainty methods, greater basin-level and climate detail, and process-level representation glacial melt-water sources. Figure 1 Figure 2

  4. Wound bed preparation: A novel approach using HydroTherapy.

    Science.gov (United States)

    Atkin, Leanne; Ousey, Karen

    2016-12-01

    Wounds that fail to heal quickly are often encountered by community nursing staff. An important step in assisting these chronic or stalled wounds progress through healing is debridement to remove devitalised tissue, including slough and eschar, that can prevent the wound from healing. A unique wound treatment called HydroTherapy aims to provide an optimal healing environment. The first step of HydroTherapy involves HydroClean plus™, this dressing enables removal of devitalised tissue through autolytic debridement and absorption of wound fluid. Irrigation and cleansing provided by Ringer's solution from the dressing further removes any necrotic tissue or eschar. Once effective wound bed preparation has been achieved a second dressing, HydroTac™, provides an ongoing hydrated wound environment that enables re-epithelialisation to occur in an unrestricted fashion. This paper presents 3 case studies of slow healing wounds treated with HydroClean plus™ which demonstrates effective wound debridement.

  5. Long term planning in the hydro-thermal system - A new generation of tools. Final report; Langtidsplanlegging i hydrotermiske system - En ny generasjon verktoey. Sluttrapport

    Energy Technology Data Exchange (ETDEWEB)

    Gjelsvik, Anders; Haugstad, Arne; Honve, Ingrid; Mo, Birger

    2010-01-15

    The project 'Long term planning in the hydro-thermal system - A new generation of tools' has during the project period 2006 - 2009 led to an upgrade of stochastic models for production planning in hydro-thermal power system. The development has primarily been concentrated on ProdRisk, a model for seasonal and long-term planning in hydropower system based on the Stochastic Dual Dynamic Programming (SDDP). The project has lifted the model a long way towards operational use of seasonal planning of hydropower producers. In addition, the quality of the results from the model, makes it considered a good model also for the analysis of development projects in waterways. The report describes this and other activity within the project. Implementation of the project has contributed both to raise the level of tools used for production planning in the Nordic countries and to increase the competence of participants. (AG)

  6. An artificial intelligence (AI) NOx/heat rate optimization system for Ontario Hydro`s fossil generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Frank, A.; Bodach, P. [Ontario Hydro, Toronto, ON (Canada); Warriner, G. [Radian International, Tucker, GA (United States); Noblett, J. [Radian International, Austin, TX (United States); Slatsky, M. [Southern Company, Birmingham, AL (United States)

    1999-08-01

    Artificial intelligence (AI)-based software packages which can optimize power plant operations that improves heat rate and also reduces nitrogen oxide emissions are now commonly available for commercial use. This paper discusses the implementation of the AI-based NOx and Heat Rate Optimization System at Ontario Hydro`s generation stations, emphasizing the current AI Optimization Project at Units 5 and 6 of the Lakeview Generating Station. These demonstration programs are showing promising results in NOx reduction and plant performance improvement. The availability of the plant Digital Control System (DCS) in implementing AI optimization in a closed-loop system was shown to be an important criterion for success. Implementation of AI technology at other Ontario Hydro fossil generating units as part of the overall NOx emission reduction system is envisaged to coincide with the retrofit of the original plant control system with the latest DCS systems. 14 refs., 3 figs.

  7. Development and applications of reactor noise analysis at Ontario Hydro`s CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O [Ontario Hydro, Toronto, ON (Canada); Tulett, M V [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1996-12-31

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro`s CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  8. Trading the Economic Value of Unsatisfied Municipal Water Demand

    Science.gov (United States)

    Telfah, Dua'a. B.; Minciardi, Riccardo; Roth, Giorgio

    2018-06-01

    Modelling and optimization techniques for water resources allocation are proposed to identify the economic value of the unsatisfied municipal water demand against demands emerging from other sectors. While this is always an important step in integrated water resource management perspective, it became crucial for water scarce Countries. In fact, since the competition for the resource is high, they are in crucial need to trade values which will help them in satisfying their policies and needs. In this framework, hydro-economic, social equity and environmental constraints need to be satisfied. In the present study, a hydro-economic decision model based on optimization schemes has been developed for water resources allocation, that enable the evaluation of the economic cost of a deficiency in fulfilling the municipal demand. Moreover, the model enables efficient water resources management, satisfying the demand and proposing additional water resources options. The formulated model is designed to maximize the demand satisfaction and minimize water production cost subject to system priorities, preferences and constraints. The demand priorities are defined based on the effect of demand dissatisfaction, while hydrogeological and physical characteristics of the resources are embedded as constraints in the optimization problem. The application to the City of Amman is presented. Amman is the Capital City of the Hashemite Kingdom of Jordan, a Country located in the south-eastern area of the Mediterranean, on the East Bank of the Jordan River. The main challenge for Jordan, that threat the development and prosperity of all sectors, is the extreme water scarcity. In fact, Jordan is classified as semi-arid to arid region with limited financial resources and unprecedented population growth. While the easy solution directly goes to the simple but expensive approach to cover the demand, case study results show that the proposed model plays a major role in providing directions to

  9. Trading the Economic Value of Unsatisfied Municipal Water Demand

    Directory of Open Access Journals (Sweden)

    D. B. Telfah

    2018-06-01

    Full Text Available Modelling and optimization techniques for water resources allocation are proposed to identify the economic value of the unsatisfied municipal water demand against demands emerging from other sectors. While this is always an important step in integrated water resource management perspective, it became crucial for water scarce Countries. In fact, since the competition for the resource is high, they are in crucial need to trade values which will help them in satisfying their policies and needs. In this framework, hydro-economic, social equity and environmental constraints need to be satisfied. In the present study, a hydro-economic decision model based on optimization schemes has been developed for water resources allocation, that enable the evaluation of the economic cost of a deficiency in fulfilling the municipal demand. Moreover, the model enables efficient water resources management, satisfying the demand and proposing additional water resources options. The formulated model is designed to maximize the demand satisfaction and minimize water production cost subject to system priorities, preferences and constraints. The demand priorities are defined based on the effect of demand dissatisfaction, while hydrogeological and physical characteristics of the resources are embedded as constraints in the optimization problem. The application to the City of Amman is presented. Amman is the Capital City of the Hashemite Kingdom of Jordan, a Country located in the south-eastern area of the Mediterranean, on the East Bank of the Jordan River. The main challenge for Jordan, that threat the development and prosperity of all sectors, is the extreme water scarcity. In fact, Jordan is classified as semi-arid to arid region with limited financial resources and unprecedented population growth. While the easy solution directly goes to the simple but expensive approach to cover the demand, case study results show that the proposed model plays a major role in

  10. Hybrid Wavelet De-noising and Rank-Set Pair Analysis approach for forecasting hydro-meteorological time series

    Science.gov (United States)

    WANG, D.; Wang, Y.; Zeng, X.

    2017-12-01

    Accurate, fast forecasting of hydro-meteorological time series is presently a major challenge in drought and flood mitigation. This paper proposes a hybrid approach, Wavelet De-noising (WD) and Rank-Set Pair Analysis (RSPA), that takes full advantage of a combination of the two approaches to improve forecasts of hydro-meteorological time series. WD allows decomposition and reconstruction of a time series by the wavelet transform, and hence separation of the noise from the original series. RSPA, a more reliable and efficient version of Set Pair Analysis, is integrated with WD to form the hybrid WD-RSPA approach. Two types of hydro-meteorological data sets with different characteristics and different levels of human influences at some representative stations are used to illustrate the WD-RSPA approach. The approach is also compared to three other generic methods: the conventional Auto Regressive Integrated Moving Average (ARIMA) method, Artificial Neural Networks (ANNs) (BP-error Back Propagation, MLP-Multilayer Perceptron and RBF-Radial Basis Function), and RSPA alone. Nine error metrics are used to evaluate the model performance. The results show that WD-RSPA is accurate, feasible, and effective. In particular, WD-RSPA is found to be the best among the various generic methods compared in this paper, even when the extreme events are included within a time series.

  11. Toward linking demographic and economic models for impact assessment

    International Nuclear Information System (INIS)

    Williams, C.A.; Meenan, C.D.

    1991-01-01

    One of the objectives of the Yucca Mountain Project, in Southern Nevada, is to evaluate the effects of the development of a high-level nuclear waste repository. As described in the Section 175 Report to the Congress of the US, the temporal scope of this repository project encompasses approximately 70 years and includes four phases: Site characterization and licensing, construction, operation, and closure and decommissioning. If retrieval of the waste were to be required, the temporal scope of the repository project could be extended to approximately 100 years. The study of the potential socioeconomic effects of this project is the foundation for this paper. This paper focuses on the economic and demographic aspects and a possible method to interface the two. First, the authors briefly discuss general socioeconomic modeling theory from a county level view point, as well as methods for the apportionment of county level data to sub-county areas. Next, the authors describe the unique economic and demographic conditions which exist in Nevada at both the state and county levels. Finally, the authors evaluate a possible procedure for analyzing repository effects at a sub-county level; this involves discussion of an interface linking the economic and demographic aspects, which is based on the reconciliation of supply and demand for labor. The authors conclude that the basis for further model development may rely on the interaction of supply and demand to produce change in wage rates. These changes in expected wages should be a justification for allocating economic migrants (who may respond to Yucca Mountain Project development) into various communities

  12. Ontario Hydro Research Division annual report 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The Research Division of Ontario Hydro conducts research in the fields of chemistry, civil engineering, electrical engineering, mechanical engineering, metallurgy, and operations. Much of the research has a bearing on the safe, environmentally benign operation of Ontario Hydro's nuclear power plants. Particular emphasis has been placed on nuclear plant component aging and plant life assurance

  13. Forecasting skills of the ensemble hydro-meteorological system for the Po river floods

    Science.gov (United States)

    Ricciardi, Giuseppe; Montani, Andrea; Paccagnella, Tiziana; Pecora, Silvano; Tonelli, Fabrizio

    2013-04-01

    The Po basin is the largest and most economically important river-basin in Italy. Extreme hydrological events, including floods, flash floods and droughts, are expected to become more severe in the next future due to climate change, and related ground effects are linked both with environmental and social resilience. A Warning Operational Center (WOC) for hydrological event management was created in Emilia Romagna region. In the last years, the WOC faced challenges in legislation, organization, technology and economics, achieving improvements in forecasting skill and information dissemination. Since 2005, an operational forecasting and modelling system for flood modelling and forecasting has been implemented, aimed at supporting and coordinating flood control and emergency management on the whole Po basin. This system, referred to as FEWSPo, has also taken care of environmental aspects of flood forecast. The FEWSPo system has reached a very high level of complexity, due to the combination of three different hydrological-hydraulic chains (HEC-HMS/RAS - MIKE11 NAM/HD, Topkapi/Sobek), with several meteorological inputs (forecasted - COSMOI2, COSMOI7, COSMO-LEPS among others - and observed). In this hydrological and meteorological ensemble the management of the relative predictive uncertainties, which have to be established and communicated to decision makers, is a debated scientific and social challenge. Real time activities face professional, modelling and technological aspects but are also strongly interrelated with organization and human aspects. The authors will report a case study using the operational flood forecast hydro-meteorological ensemble, provided by the MIKE11 chain fed by COSMO_LEPS EQPF. The basic aim of the proposed approach is to analyse limits and opportunities of the long term forecast (with a lead time ranging from 3 to 5 days), for the implementation of low cost actions, also looking for a well informed decision making and the improvement of

  14. Small hydro-electric potential: west Poverty Bay region

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    This study has identified six schemes in the Bay of Plenty Electric Power Board area and two in the Poverty Bay Electric Power Board area, of which five and one, respectively, are below the economic limit of $2400/kW suggested by the Ministry of Works and Development as of December 1979. Of these, only three appear both economically and environmentally acceptable. The Takaputahi and Torere schemes are not likely to proceed if the Ministry of Works and Development continue with their plans to develop the Motu River. Furthermore, the Motu Falls scheme is unlikely to proceed for environmental reasons. The schemes identified are not very attractive on the national scale and could not be justified on local terms. However, a detailed feasibility study of the Takaputahi/Torere diversion should be undertaken prior to a decision being made to proceed with the Motu development, or if the proposals are dropped. The present low load and slow growth of the area is such that prior to a small hydro-electric scheme being built, there would need to be an established demand for power.

  15. Impact of flocculation on flotation tailing's hydro-cycloning properties

    Directory of Open Access Journals (Sweden)

    Knežević Dinko N.

    2014-01-01

    Full Text Available Research results of hydro-cycloning of flocculated and non-flocculated flotation tailing from the lead and zinc open pit mine 'Suplja stijena', Sula - Montenegro have been shown in this paper. Reason for this research was finding conditions in order to separate fraction that is suitable for embankment erection. Flotation tailings has been tested in the very state that it goes out from the flotation process and tailings which is flocculated by anionic flocculant. The object was to determine the impact of flocculation on properties of hydro-cycloning products and disposal process. In hydro-cycloning process greater underflow mass is being separated with non-flocculated tailing. Values of geomechanical parameters are significantly different, especially hydro-cyclone's underflow. All geomechanical parameters of hydro-cyclone's underflow are suitable for erecting embankment which shall be made from non-flocculated tailing. Underflow drainage of non-flocculated tailing is faster while overflow drainage is slower and problematic with both tailings.

  16. Model for 3D-visualization of streams and techno-economic estimate of locations for construction of small hydropower plants

    International Nuclear Information System (INIS)

    Izeiroski, Subija

    2012-01-01

    platform practical and efficient information regarding the elevation drops along river streams from the potential points of intake locations to the location of objects of the small hydropower plants. In the hydrology analysis are used historic measured data in table format regarding the flow rates and precipitation for the period 1961-2000 from two pluviometric station that are close each other. At the calculation of precipitations at annual level in GIS platform is used a stochastic quadratic equation for correlation between the rainfall (precipitation) and elevation which is valid for the climatic zone of the south-west region of Republic of Macedonia. using more hydrological methods: Rational method, Area-proportion method, Regression analysis and others, are obtained graphic raster maps for numerical values of flow rates at pixel level, and also is executed a comparative analysis of obtained results. Having available data for slope (elevation drops) and values of flows, is made analysis of the hydro power potential and locations for SHP construction along Brajchanska river and its main tributaries. The analysis showed that at the higher elevation of 1000 m.a.s.l. are found more than 10 potential locations for SHP construction. From the executed analysis was also determined, that the combination of more intakes that are directed to one SHP plant gives significantly more power output and energy. Together with the techno-engineering analysis, is also given a short review considering the economic justification for SHP construction and the impact at the environment. The developed model at the study area can also serve as a practical model at the analysis regarding the assessment and the site selection of SHP in all other areas reach with water resources. The methodological approach developed in this research, can contribute to a great extent for quick and efficient decision making regarding the preliminary screening of locations and assessment of the hydro power potentials

  17. Hydrologic and Agent-based Modelling of Hydro-refugia in East Africa, Insights into the Importance of Water Resources in Hominin Evolution and Dispersal

    Science.gov (United States)

    Ashley, G. M.; Cuthbert, M. O.; Gleeson, T. P.; Reynolds, S. R.; Bennett, M. R.; Newton, A. C.; McCormack, C. J.

    2017-12-01

    Hominin evolution and climate variability have often been linked because of the apparent coincidence of climate fluctuations and speciation or extinctions, although the cause and effect of climate on natural selection is not clear. Climate in the EARS (East African Rift System) where most hominin first occurrences are located experienced an overall drying over the last 7 myr. Superimposed on this trend, Milankovitch cycles generated wet-dry precession cycles ( 23 kyr) that changed both water and food resource availability. During dry periods, lakes became more alkaline and rivers ephemeral but, groundwater, buffered from surface climate effects, remained a potential resource during the driest of times. The possibility of widespread groundwater sources hydro-refugia, such as springs, wetlands and groundwater-fed perennial streams has received little attention with respect to the paleoenvironmental context of hominin evolution or dispersal. We demonstrate that hydrogeological modelling of the modern landscape in East Africa coupled with ABM (agent-based modelling) of hominin movement yields new insight into potential correlates of hominin survival and dispersal. Digitized hydrological mapping of present day rivers, lakes and springs along the EARS (2000 km) from northern Tanzania to Ethiopia provided the modelling framework. Present day conditions are considered analogous to past dry periods; wet period conditions are an expanded hydrologic network including all surface water bodies. Our focus was on perennial springs discharging at 1,000 m3/y (volume to sustain a small wetland). 450 such springs occur and were found to be significantly controlled by geology, not just climate. The ABM was designed to determine if it was possible for humans to walk between hydro-refugia in 3 days. Four climate scenarios were run on ABM: wet, wet-to-dry, dry and dry-to-wet. During dry periods our results suggest that groundwater availability would have been critical to supporting

  18. Competition policy and regulation in hydro-dominated electricity markets

    International Nuclear Information System (INIS)

    Rangel, Luiz Fernando

    2008-01-01

    This paper discusses the main competition issues that arise in electricity systems dominated by hydro generation, arguing that technological differences between hydro and thermal plants may allow hydropower producers to exert market power in different and subtler ways compared to thermal generators. The key for market power in hydro-based systems is the strategic allocation of a given amount of output across periods, rather than a straightforward reduction of total output. The paper examines the interaction between strategic hydro reservoir operation and transmission capacity constraints, and summarizes the implications of market power for system reliability. A review of recent relevant literature is included. Finally, possible interventions to mitigate market power are analysed

  19. Modelling and simulation of the fuel cell energy source for the Hydro-Gen vehicle; Modelisation et simulation de la source d'energie a pile a combustible du vehicule Hydro-Gen

    Energy Technology Data Exchange (ETDEWEB)

    Schott, P.; Baurens, P. [CEA Grenoble, Dept. d' Etudes des Materiaux, DEM, 38 (France); Poirot, J.Ph. [PSA/DRIA/SEE, 78 - Velizy Villacoublay (France)

    2000-07-01

    A fuel cell generating set is a complex system in which the interactions between the different elements are chemical, hydraulic, thermal, mechanical and electric. The implementation and the optimization of such a system cannot be limited to the study of each element; the system analysis and then the modelling and the dynamical simulation are necessarily required. The bond-graphs theory is particularly well adapted to the multiplicity of the involved phenomena. In this article is presented the modelling used for the generating set of the Hydro-Gen plan. Some representative examples are given as well as the first qualitative results of the simulations. (O.M.)

  20. Hydro turbines: An introduction

    International Nuclear Information System (INIS)

    Gordon, J.L.

    1993-01-01

    The various types of hydraulic turbines currently used in hydroelectric power plants are described. The descriptions are intended for use by non-engineers who are concerned with fish passage and fish mortality at a hydro power facility. Terminology used in the hydro industry is explained. Since the extent of cavitation is one of the factors affecting mortality rates of fish passing through hydraulic turbines, an equation is introduced which measures the extent of cavitation likely to be experienced in a turbine. An example of how the cavitation index can be calculated is provided for two typical power plants. The relation between certain parameters of power plant operation and the extent of cavitation, and therefore of fish mortality, is illustrated. 2 refs., 14 figs

  1. Architecture at Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  2. HTGR Application Economic Model Users' Manual

    International Nuclear Information System (INIS)

    Gandrik, A.M.

    2012-01-01

    The High Temperature Gas-Cooled Reactor (HTGR) Application Economic Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Application Economic Model calculates either the required selling price of power and/or heat for a given internal rate of return (IRR) or the IRR for power and/or heat being sold at the market price. The user can generate these economic results for a range of reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for up to 16 reactor modules; and for module ratings of 200, 350, or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Application Economic Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Application Economic Model. This model was designed for users who are familiar with the HTGR design and Excel and engineering economics. Modification of the HTGR Application Economic Model should only be performed by users familiar with the HTGR and its applications, Excel, and Visual Basic.

  3. Hydro-mechanical behaviour of a heterogeneous compacted soil: experimental observations and modelling

    International Nuclear Information System (INIS)

    Gens, A.; Vallejan, B.; Sanchez, M.; Imbert, C.; Villar, M.V.; Van Geet, M.

    2011-01-01

    The paper describes a theoretical and experimental study of the coupled hydro-mechanical behaviour of a compacted mixture of bentonite powder and bentonite pellets intended as sealing material in underground repositories for nuclear waste. One of the main advantages of the use of powder/pellets mixtures is the reduction of the compaction effort required to achieve the value of average dry density necessary to attain the required swelling potential. However, the heterogeneous fabric of the material requires special approaches in order to describe adequately its behaviour during hydration. A double porosity formulation is presented to account for the presence of two distinct structural levels in the material. Hydraulic equilibrium between the two porosities is not assumed; instead a water exchange term between them is postulated. The formulation is applied to the modelling of a number of one-dimensional swelling pressure tests performed in the CEA (Commissariat a l'Energie Atomique, France) and CIEMAT (Spain) laboratories. A very satisfactory quantitative description of the experimental observations is obtained that includes a number of complex behaviour features such as size effects and non-monotonic development of swelling pressures. Some micro-fabric observations using X-ray tomography and mercury intrusion porosimetry lend support to the conceptual approach adopted. The formulation is then applied to the analysis of a long-term large-scale sealing test performed at the Hades underground facility in Belgium, using the same set of hydraulic and mechanical parameters employed in the modelling of the laboratory tests. Although the field observations exhibit a much higher degree of scatter, the basic behaviour of the field sealing test is satisfactorily simulated. A formulation that incorporates basic features of the micro-fabric of the mixture is thus able to span successfully over a large range of space and time scales. (authors)

  4. Coupled hydrological, ecological, decision and economic models for monetary valuation of riparian ecosystem services

    Science.gov (United States)

    Goodrich, D. C.; Brookshire, D.; Broadbent, C.; Dixon, M. D.; Brand, L. A.; Thacher, J.; Benedict, K. K.; Lansey, K. E.; Stromberg, J. C.; Stewart, S.; McIntosh, M.

    2011-12-01

    Water is a critical component for sustaining both natural and human systems. Yet the value of water for sustaining ecosystem services is not well quantified in monetary terms. Ideally decisions involving water resource management would include an apples-to-apples comparison of the costs and benefits in dollars of both market and non-market goods and services - human and ecosystem. To quantify the value of non-market ecosystem services, scientifically defensible relationships must be developed that link the effect of a decision (e.g. human growth) to the change in ecosystem attributes from current conditions. It is this linkage that requires the "poly-disciplinary" coupling of knowledge and models from the behavioral, physical, and ecological sciences. In our experience another key component of making this successful linkage is development of a strong poly-disciplinary scientific team that can readily communicate complex disciplinary knowledge to non-specialists outside their own discipline. The time to build such a team that communicates well and has a strong sense of trust should not be underestimated. The research described in the presentation incorporated hydrologic, vegetation, avian, economic, and decision models into an integrated framework to determine the value of changes in ecological systems that result from changes in human water use. We developed a hydro-bio-economic framework for the San Pedro River Region in Arizona that considers groundwater, stream flow, and riparian vegetation, as well as abundance, diversity, and distribution of birds. In addition, we developed a similar framework for the Middle Rio Grande of New Mexico. There are six research components for this project: (1) decision support and scenario specification, (2) regional groundwater model, (3) the riparian vegetation model, (4) the avian model, (5) methods for displaying the information gradients in the valuation survey instruments (Choice Modeling and Contingent Valuation), and (6

  5. VT Data - Lidar Hydro-enforced DEM (0.7m) 2015, Windham County

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) This metadata applies to the following collection area(s): Windham County 2015 0.7m and Hydro Enforced Digital Elevation Model (DEMHE) dataset....

  6. HydroClimATe: hydrologic and climatic analysis toolkit

    Science.gov (United States)

    Dickinson, Jesse; Hanson, Randall T.; Predmore, Steven K.

    2014-01-01

    The potential consequences of climate variability and climate change have been identified as major issues for the sustainability and availability of the worldwide water resources. Unlike global climate change, climate variability represents deviations from the long-term state of the climate over periods of a few years to several decades. Currently, rich hydrologic time-series data are available, but the combination of data preparation and statistical methods developed by the U.S. Geological Survey as part of the Groundwater Resources Program is relatively unavailable to hydrologists and engineers who could benefit from estimates of climate variability and its effects on periodic recharge and water-resource availability. This report documents HydroClimATe, a computer program for assessing the relations between variable climatic and hydrologic time-series data. HydroClimATe was developed for a Windows operating system. The software includes statistical tools for (1) time-series preprocessing, (2) spectral analysis, (3) spatial and temporal analysis, (4) correlation analysis, and (5) projections. The time-series preprocessing tools include spline fitting, standardization using a normal or gamma distribution, and transformation by a cumulative departure. The spectral analysis tools include discrete Fourier transform, maximum entropy method, and singular spectrum analysis. The spatial and temporal analysis tool is empirical orthogonal function analysis. The correlation analysis tools are linear regression and lag correlation. The projection tools include autoregressive time-series modeling and generation of many realizations. These tools are demonstrated in four examples that use stream-flow discharge data, groundwater-level records, gridded time series of precipitation data, and the Multivariate ENSO Index.

  7. INFORMATION SYSTEM FOR MODELING ECONOMIC AND FINANCIAL PERFORMANCES

    Directory of Open Access Journals (Sweden)

    Boldeanu Dana Maria

    2009-05-01

    Full Text Available The analysis of the most important financial and economic indicators at the level of some organizations from the same sector of activity, the selection of performance ratios and generating a particular analysis model help companies to move from the desire

  8. Short-term hydro-thermal-wind complementary scheduling considering uncertainty of wind power using an enhanced multi-objective bee colony optimization algorithm

    International Nuclear Information System (INIS)

    Zhou, Jianzhong; Lu, Peng; Li, Yuanzheng; Wang, Chao; Yuan, Liu; Mo, Li

    2016-01-01

    Highlights: • HTWCS system is established while considering uncertainty of wind power. • An enhanced multi-objective bee colony optimization algorithm is proposed. • Some heuristic repairing strategies are designed to handle various constraints. • HTWCS problem with economic/environment objectives is solved by EMOBCO. - Abstract: This paper presents a short-term economic/environmental hydro-thermal-wind complementary scheduling (HTWCS) system considering uncertainty of wind power, as well as various complicated non-linear constraints. HTWCS system is formulated as a multi-objective optimization problem to optimize conflictive objectives, i.e., economic and environmental criteria. Then an enhanced multi-objective bee colony optimization algorithm (EMOBCO) is proposed to solve this problem, which adopts Elite archive set, adaptive mutation/selection mechanism and local searching strategy to improve global searching ability of standard bee colony optimization (BCO). Especially, a novel constraints-repairing strategy with compressing decision space and a violation-adjustment method are used to handle various hydraulic and electric constraints. Finally, a daily scheduling simulation case of hydro-thermal-wind system is conducted to verify feasibility and effectiveness of the proposed EMOBCO in solving HTWCS problem. The simulation results indicate that the proposed EMOBCO can provide lower economic cost and smaller pollutant emission than other method established recently while considering various complex constraints in HTWCS problem.

  9. Hydro-geomorphologic events in Portugal and its association with Circulation weather types

    Science.gov (United States)

    Pereira, Susana; Ramos, Alexandre M.; Rebelo, Luís; Trigo, Ricardo M.; Zêzere, José L.

    2017-04-01

    characterize the climatic forcing of hydro-geomorphologic risk in Portugal. The weather type classification used herein is an automated version of the Lamb weather type procedure, initially developed for the United Kingdom and often named circulation weather types (CWT) and latter adapted for Portugal. We computed the daily CWT for the 1865-2015 period by means of the daily SLP retrieved from the 20 Century Reanalysis dataset. The relationship between the CWTs and the hydro-meteorological events in Portugal shows that the cyclonic, westerly and southwesterly are CWTs frequently associated with major socio-economic impacts of DISASTER events. In addition, CWT basic variables (flow strength, vorticity and direction) were used to better understand the impacts of the meteorological conditions in the hydro-meteorological events in Portugal. Reference: Zêzere, J. L., Pereira, S., Tavares, A. O., Bateira, C., Trigo, R. M., Quaresma, I., Santos, P. P., Santos, M. and Verde, J.: DISASTER: a GIS database on hydro-geomorphologic disasters in Portugal, Nat. Hazards, 72(2), 503-532, doi:10.1007/s11069-013-1018-y, 2014. This work was supported by the project FORLAND - Hydrogeomorphologic risk in Portugal: driving forces and application for land use planning [grant number PTDC/ATPGEO/1660/2014] funded by the Portuguese Foundation for Science and Technology (FCT), Portugal. A. M. Ramos was also supported by a FCT postdoctoral grant (FCT/DFRH/ SFRH/BPD/84328/2012).

  10. Impact of the future water value on wind-reversible hydro offering strategies in electricity markets

    International Nuclear Information System (INIS)

    Sánchez de la Nieta, A.A.; Contreras, J.; Catalão, J.P.S.

    2015-01-01

    Highlights: • A stochastic mixed integer linear model is proposed to maximize the profit and the future water value. • Conditional Value at Risk (CVaR) is used for risk-hedging. • The offer strategies analyzed are single and separate, with and without a physical connection. • The effect of considering the future water value of the reservoirs is studied for several time horizons. - Abstract: A coordinated offering strategy between a wind farm and a reversible hydro plant can reduce wind power imbalances, improving the system efficiency whilst decreasing the total imbalances. A stochastic mixed integer linear model is proposed to maximize the profit and the future water value FWV of the system using Conditional Value at Risk (CVaR) for risk-hedging. The offer strategies analyzed are: (i) single wind-reversible hydro offer with a physical connection between wind and hydro units to store spare wind energy, and (ii) separate wind and reversible hydro offers without a physical connection between them. The effect of considering the FWV of the reservoirs is studied for several time horizons: one week (168 h) and one month (720 h) using an illustrative case study. Conclusions are duly drawn from the case study to show the impact of FWV in the results.

  11. Modelling efficient innovative work: integration of economic and social psychological approaches

    Directory of Open Access Journals (Sweden)

    Babanova Yulia

    2017-01-01

    Full Text Available The article deals with the relevance of integration of economic and social psychological approaches to the solution of enhancing the efficiency of innovation management. The content, features and specifics of the modelling methods within each of approaches are unfolded and options of integration are considered. The economic approach lies in the generation of the integrated matrix concept of management of innovative development of an enterprise in line with the stages of innovative work and the use of the integrated vector method for the evaluation of the innovative enterprise development level. The social psychological approach lies in the development of a system of psychodiagnostic indexes of activity resources within the scope of psychological innovative audit of enterprise management and development of modelling methods for the balance of activity trends. Modelling the activity resources is based on the system of equations accounting for the interaction type of psychodiagnostic indexes. Integration of two approaches includes a methodological level, a level of empirical studies and modelling methods. There are suggested options of integrating the economic and psychological approaches to analyze available material and non-material resources of the enterprises’ innovative work and to forecast an optimal option of development based on the implemented modelling methods.

  12. Analysing hydro-mechanical behaviour of reinforced slopes through centrifuge modelling

    Science.gov (United States)

    Veenhof, Rick; Wu, Wei

    2017-04-01

    Every year, slope instability is causing casualties and damage to properties and the environment. The behaviour of slopes during and after these kind of events is complex and depends on meteorological conditions, slope geometry, hydro-mechanical soil properties, boundary conditions and the initial state of the soils. This study describes the effects of adding reinforcement, consisting of randomly distributed polyolefin monofilament fibres or Ryegrass (Lolium), on the behaviour of medium-fine sand in loose and medium dense conditions. Direct shear tests were performed on sand specimens with different void ratios, water content and fibre or root density, respectively. To simulate the stress state of real scale field situations, centrifuge model tests were conducted on sand specimens with different slope angles, thickness of the reinforced layer, fibre density, void ratio and water content. An increase in peak shear strength is observed in all reinforced cases. Centrifuge tests show that for slopes that are reinforced the period until failure is extended. The location of shear band formation and patch displacement behaviour indicate that the design of slope reinforcement has a significant effect on the failure behaviour. Future research will focus on the effect of plant water uptake on soil cohesion.

  13. Dynamic modeling, simulation and control design of an advanced micro-hydro power plant for distributed generation applications

    Energy Technology Data Exchange (ETDEWEB)

    Marquez, J.L. [Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Molina, M.G. [CONICET, Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Pacas, J.M. [Institut fuer Leistungselektronik und Elektrische Antriebe, Universitaet Siegen, Fachbereich 12 Hoelderlinstr 3, D 57068 Siegen (Germany)

    2010-06-15

    A small-scale hydropower station is usually a run-of-river plant that uses a fixed speed drive with mechanical regulation of the turbine water flow rate for controlling the active power generation. This design enables to reach high efficiency over a wide range of water flows but using a complex operating mechanism, which is in consequence expensive and tend to be more affordable for large systems. This paper proposes an advanced structure of a micro-hydro power plant (MHPP) based on a smaller, lighter, more robust and more efficient higher-speed turbine. The suggested design is much simpler and eliminates all mechanical adjustments through a novel electronic power conditioning system for connection to the electric grid. In this way, it allows obtaining higher reliability and lower cost of the power plant. A full detailed model of the MHPP is derived and a new three-level control scheme is designed. The dynamic performance of the proposed MHPP is validated through digital simulations and employing a small-scale experimental set-up. (author)

  14. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  15. Economic security of the Russian Federation: current status, level and threats

    Directory of Open Access Journals (Sweden)

    V. V. Grigoryeva

    2017-01-01

    Full Text Available The problems of national and economic security maintenanceis aggravating in modern conditions of globalization and international competition related to controlof market channels, technological, information and natural resources.Today Russia is making all efforts to protect its position on the world stage and improve the lives of its citizens.Despite the worsening of the present economic, political and social differences in the world, the Russian Federation has its own national interests, which can be possible to fulfill only on the basis of sustainable development of the national economic security system.The latter traditionally determines the ability of the state economic system to maintain normal conditions for the national economy functioning and the population activity. The national economic securitystabilitycan be estimated only by the application of elaborate tools of the economic development indicators analysis and the threshold values examinationaimed at the determination of the quality characteristic of actual and the most successful model of the economic activity.The analysis of the current Russian economic situation showed the presence of some serious problems existing in the national economy. The economic security level of Russia, having a tendency to increase in the period of 1998-2013, has been sharply reduced to critical points since 2014. So, it is necessary to take some measures to restructure the system of economic security of the state. Based on the research it was identified the list of the most dangerous threats to the modern Russian economy, which includes: low level of the country industrial production; the economy dependence on goods import and raw materials export; low living standards of the population; the rapid growth of the shadow economy and corruption; the lack of civil science and innovationdevelopment. The main strategic directions for economic security levelincrease in Russia today and in the future are aimed at

  16. Impact of river stage prediction methods on stream-aquifer exchanges in a hydro(geo)logical model at the regional scale

    Science.gov (United States)

    Saleh, F.; Flipo, N.; de Fouquet, C.

    2012-04-01

    The main objective of this study is to provide a realistic simulation of river stage in regional river networks in order to improve the quantification of stream-aquifer exchanges and better assess the associated aquifer responses that are often impacted by the magnitude and the frequency of the river stage fluctuations. The study focuses on the Oise basin (17 000 km2, part of the 65 000 km2 Seine basin in Northern France) where stream-aquifer exchanges cannot be assessed directly by experimental methods. Nowadays numerical methods are the most appropriate approaches for assessing stream-aquifer exchanges at this scale. A regional distributed process-based hydro(geo)logical model, Eau-Dyssée, is used, which aims at the integrated modeling of the hydrosystem to manage the various elements involved in the quantitative and qualitative aspects of water resources. Eau-Dyssée simulates pseudo 3D flow in aquifer systems solving the diffusivity equation with a finite difference numerical scheme. River flow is simulated with a Muskingum model. In addition to the in-stream discharge, a river stage estimate is needed to calculate the water exchange at the stream-aquifer interface using the Darcy law. Three methods for assessing in-stream river stages are explored to determine the most appropriate representation at regional scale over 25 years (1980-2005). The first method consists in defining rating curves for each cell of a 1D Saint-Venant hydraulic model. The second method consists in interpolating observed rating curves (at gauging stations) onto the river cells of the hydro(geo)logical model. The interpolation technique is based on geostatistics. The last method assesses river stage using Manning equation with a simplified rectangular cross-section (water depth equals the hydraulic radius). Compared to observations, the geostatistical and the Manning methodologies lead to slightly less accurate (but still acceptable) results offering a low computational cost opportunity

  17. Hydro-elastic analysis and optimization of a composite marine propeller

    DEFF Research Database (Denmark)

    Blasques, José Pedro Albergaria Amaral; Berggreen, Christian; Andersen, Poul

    2010-01-01

    The present paper addresses the design and optimization of a flexible composite marine propeller. The aim is to tailor the laminate to control the deformed shape of the blade and consequently the developed thrust. The development of a hydro-elastic model is presented, and the laminate lay-up which...

  18. Fuzzy interpolation of hydro power sales data in Simulink

    DEFF Research Database (Denmark)

    Jantzen, Jan; Eliasson, B.

    1994-01-01

    The problem in this case study can be described as a multi-dimensional surface fit to a given set of data. The data are sales figures in MWH/H for a hydro-thermal power generation system. The data are incomplete and not totally reliable. A model with ten fuzzy rules fits the data with a total error...

  19. Ontario Hydro looks at security

    International Nuclear Information System (INIS)

    Green, B.J.; Kee, B.

    1995-01-01

    Ontario Hydro operates 20 CANDU reactors on three different sites. Since 1984, a review of security arrangements on all the sites has taken place on a five-yearly basis. The review process for 1995 is outlined. The three objectives were as follows: to assess current security threats and risks to the stations; to assess the adequacy of the existing programme to protect against current threats; by comparing the security programme against those of comparable entities to establish benchmarks for good practice as a basis for improvements at Ontario Hydro. Valuable insights gained through the review are listed. These could be useful to other utilities. (UK)

  20. Hydro-environmental management of groundwater resources: A fuzzy-based multi-objective compromise approach

    Science.gov (United States)

    Alizadeh, Mohammad Reza; Nikoo, Mohammad Reza; Rakhshandehroo, Gholam Reza

    2017-08-01

    Sustainable management of water resources necessitates close attention to social, economic and environmental aspects such as water quality and quantity concerns and potential conflicts. This study presents a new fuzzy-based multi-objective compromise methodology to determine the socio-optimal and sustainable policies for hydro-environmental management of groundwater resources, which simultaneously considers the conflicts and negotiation of involved stakeholders, uncertainties in decision makers' preferences, existing uncertainties in the groundwater parameters and groundwater quality and quantity issues. The fuzzy multi-objective simulation-optimization model is developed based on qualitative and quantitative groundwater simulation model (MODFLOW and MT3D), multi-objective optimization model (NSGA-II), Monte Carlo analysis and Fuzzy Transformation Method (FTM). Best compromise solutions (best management policies) on trade-off curves are determined using four different Fuzzy Social Choice (FSC) methods. Finally, a unanimity fallback bargaining method is utilized to suggest the most preferred FSC method. Kavar-Maharloo aquifer system in Fars, Iran, as a typical multi-stakeholder multi-objective real-world problem is considered to verify the proposed methodology. Results showed an effective performance of the framework for determining the most sustainable allocation policy in groundwater resource management.

  1. Application of multi-model control with fuzzy switching to a micro hydro-electrical power plant

    Energy Technology Data Exchange (ETDEWEB)

    Salhi, Issam; Doubabi, Said [Laboratory of Electric Systems and Telecommunications (LEST), Faculty of Sciences and Technologies of Marrakesh, Cadi Ayyad University, BP 549, Av Abdelkarim Elkhattabi, Gueliz, Marrakesh (Morocco); Essounbouli, Najib; Hamzaoui, Abdelaziz [CReSTIC, Reims University, 9, rue de Quebec B.P. 396, F-10026 Troyes cedex (France)

    2010-09-15

    Modelling hydraulic turbine generating systems is not an easy task because they are non-linear and uncertain where the operating points are time varying. One way to overcome this problem is to use Takagi-Sugeno (TS) models, which offer the possibility to apply some tools from linear control theory, whereas those models are composed of linear models connected by a fuzzy activation function. This paper presents an approach to model and control a micro hydro power plant considered as a non-linear system using TS fuzzy systems. A TS fuzzy system with local models is used to obtain a global model of the studied plant. Then, to combine efficiency and simplicity of design, PI controllers are synthesised for each considered operating point to be used as conclusion of an electrical load TS Fuzzy controller. The latter ensures the global stability and desired performance despite the change of operating point. The proposed approach (model and controller) is tested on a laboratory prototype, where the obtained results show their efficiency and their capability to ensure good performance despite the non-linear nature of the plant. (author)

  2. Experimental Hydro-Mechanical Characterization of Full Load Pressure Surge in Francis Turbines

    Science.gov (United States)

    Müller, A.; Favrel, A.; Landry, C.; Yamamoto, K.; Avellan, F.

    2017-04-01

    Full load pressure surge limits the operating range of hydro-electric generating units by causing significant power output swings and by compromising the safety of the plant. It appears during the off-design operation of hydraulic machines, which is increasingly required to regulate the broad integration of volatile renewable energy sources into the existing power network. The underlying causes and governing physical mechanisms of this instability were investigated in the frame of a large European research project and this paper documents the main findings from two experimental campaigns on a reduced scale model of a Francis turbine. The multi-phase flow in the draft tube is characterized by Particle Image Velocimetry, Laser Doppler Velocimetry and high-speed visualizations, along with synchronized measurements of the relevant hydro-mechanical quantities. The final result is a comprehensive overview of how the unsteady draft tube flow and the mechanical torque on the runner shaft behave during one mean period of the pressure oscillation, thus defining the unstable fluid-structure interaction responsible for the power swings. A discussion of the root cause is initiated, based on the state of the art. Finally, the latest results will enable a validation of recent RANS flow simulations used for determining the key parameters of hydro-acoustic stability models.

  3. USING GEM - GLOBAL ECONOMIC MODEL IN ACHIEVING A GLOBAL ECONOMIC FORECAST

    Directory of Open Access Journals (Sweden)

    Camelia Madalina Orac

    2013-12-01

    Full Text Available The global economic development model has proved to be insufficiently reliable under the new economic crisis. As a result, the entire theoretical construction about the global economy needs rethinking and reorientation. In this context, it is quite clear that only through effective use of specific techniques and tools of economic-mathematical modeling, statistics, regional analysis and economic forecasting it is possible to obtain an overview of the future economy.

  4. Network models in economics and finance

    CERN Document Server

    Pardalos, Panos; Rassias, Themistocles

    2014-01-01

    Using network models to investigate the interconnectivity in modern economic systems allows researchers to better understand and explain some economic phenomena. This volume presents contributions by known experts and active researchers in economic and financial network modeling. Readers are provided with an understanding of the latest advances in network analysis as applied to economics, finance, corporate governance, and investments. Moreover, recent advances in market network analysis  that focus on influential techniques for market graph analysis are also examined. Young researchers will find this volume particularly useful in facilitating their introduction to this new and fascinating field. Professionals in economics, financial management, various technologies, and network analysis, will find the network models presented in this book beneficial in analyzing the interconnectivity in modern economic systems.

  5. Pressurized air injection in an axial hydro-turbine model for the mitigation of tip leakage cavitation

    Science.gov (United States)

    Rivetti, A.; Angulo, M.; Lucino, C.; Liscia, S.

    2015-12-01

    Tip leakage vortex cavitation in axial hydro-turbines may cause erosion, noise and vibration. Damage due to cavitation can be found at the tip of the runner blades on the low pressure side and the discharge ring. In some cases, the erosion follows an oscillatory pattern that is related to the number of guide vanes. That might suggest that a relationship exists between the flow through the guide vanes and the tip vortex cavitating core that induces this kind of erosion. On the other hand, it is known that air injection has a beneficial effect on reducing the damage by cavitation. In this paper, a methodology to identify the interaction between guide vanes and tip vortex cavitation is presented and the effect of air injection in reducing this particular kind of erosion was studied over a range of operating conditions on a Kaplan scale model. It was found that air injection, at the expense of slightly reducing the efficiency of the turbine, mitigates the erosive potential of tip leakage cavitation, attenuates the interaction between the flow through the guide vanes and the tip vortex and decreases the level of vibration of the structural components.

  6. Influence Factors of the Economic Development Level Across European Countries

    OpenAIRE

    Diana Ioana POPA

    2016-01-01

    The economic development level of a country refers to the measure of the progress in an economy that could be measured, especially through GDP or GDP per capita. The level of these indicators can be influenced by many factors as a large scale, from social and economical to environmental and government policies factors. The paper aims to investigate some of these influence factors of the economic development level, represented in this case by GDP per capita, across European countries in the...

  7. Economic models for battery energy storage

    International Nuclear Information System (INIS)

    Reckrodt, R.C.; Anderson, M.D.; Kluczny, R.M.

    1990-01-01

    While the technology required to produce viable Battery Energy Storage System exists, the economic feasibility (cost vs. benefits) of building these systems requires justification. First, a generalized decision diagram was developed to ensure that all of the economic factors were considered and properly related for the customer-side-of-the meter. Next, two economic models that had consistently given differing results were compared. One was the McKinney model developed at UM-Rolla in 1987; the second was the SYSPLAN model developed by Battelle. Differences were resolved on a point by point basis with reference to the current economic environment. The economic model was upgraded to include the best of both models based on the resolution of these differences. The upgrades were implemented as modifications to the original SYSPLAN (1986 version) to preserve user friendliness. In this paper four specific cases are evaluated and compared. The results are as predicted, since comparison was made with two known models

  8. Physical-Socio-Economic Modeling of Climate Change

    Science.gov (United States)

    Chamberlain, R. G.; Vatan, F.

    2008-12-01

    Because of the global nature of climate change, any assessment of the effects of plans, policies, and response to climate change demands a model that encompasses the entire Earth System, including socio- economic factors. Physics-based climate models of the factors that drive global temperatures, rainfall patterns, and sea level are necessary but not sufficient to guide decision making. Actions taken by farmers, industrialists, environmentalists, politicians, and other policy makers may result in large changes to economic factors, international relations, food production, disease vectors, and beyond. These consequences will not be felt uniformly around the globe or even across a given region. Policy models must comprehend all of these considerations. Combining physics-based models of the Earth's climate and biosphere with societal models of population dynamics, economics, and politics is a grand challenge with high stakes. We propose to leverage our recent advances in modeling and simulation of military stability and reconstruction operations to models that address all these areas of concern. Following over twenty years' experience of successful combat simulation, JPL has started developing Minerva, which will add demographic, economic, political, and media/information models to capabilities that already exist. With these new models, for which we have design concepts, it will be possible to address a very wide range of potential national and international problems that were previously inaccessible. Our climate change model builds on Minerva and expands the geographical horizon from playboxes containing regions and neighborhoods to the entire globe. This system consists of a collection of interacting simulation models that specialize in different aspects of the global situation. They will each contribute to and draw from a pool of shared data. The basic models are: the physical model; the demographic model; the political model; the economic model; and the media

  9. A Novel Frequency Restoring Strategy of Hydro-PV Hybrid Microgrid

    DEFF Research Database (Denmark)

    Wei, Feng; Kai, Sun; Guan, Yajuan

    2014-01-01

    . The existence of frequency steady-state error and the slow active power/frequency dynamic response are inevitable. Therefore, a novel frequency restoring strategy for the hydro-PV hybrid microgrid based on the improved hierarchical control of PV systems is proposed in this paper. The output active power of PV......The conventional PV systems based on the voltage inverters only inject dispatched power to the utility grid when they work at a grid-connected mode in the hydro-PV hybrid microgrid. Due to the droop method employed for load sharing between generators, as well as the enormous inertia of system...... systems is controlled by an extra frequency restoring controller resided in the tertiary control level. The frequency steady-state error is eliminated through regulating and rebalancing the power flow between the hydropower and the PV system. The proposed strategy has verified through simulations...

  10. Deconstructing hydro: the BC electricity sector in this decade

    International Nuclear Information System (INIS)

    Jaccard, M.

    2001-01-01

    This paper provided speculation regarding the world-wide trend to deregulate electric utilities with particular focus on power deregulation in British Columbia. The four main issues facing electricity reform in British Columbia are to determine if publicly-owned assets should be privatised, how to achieve competitive electricity commodity prices in a de-regulated generation market, to determine the extent to which customers will be allowed direct access to sellers of electricity, and to determine which changes in industry structure are needed to ensure that control over the common carrier does not hinder fair competition. BC Hydro recently issued a plan for the next decade entitled the Integrated Electricity Plan which suggests that almost all growth in supply on the Hydro system will be limited to a few large projects totalling 900 megawatts, to be owned and operated by either BC Hydro or by the Columbia Power Corporation, another Crown entity. This plan is in complete contrast to the evolution of the electricity industry nearly everywhere else in the world where demand growth is being met almost entirely by small- and medium-scale non-utility resources issuing from competitive markets with minimal public funding. This article looks at why BC Hydro will probably be transformed significantly, even dismantled, in the coming decade. The article begins with a section explaining the cause and effects of major changes in the world-wide electricity industry. This is followed by a section reviewing what BC Hydro did in the 1990s while reform was taking place. The article also describes what BC Hydro intends to do in the next decade and explores reasons why this outcome is unlikely. The final section of the article provides an alternative vision of BC Hydro's future over the next decade. 1 tab., 3 figs

  11. Modeling Renewable Penertration Using a Network Economic Model

    Science.gov (United States)

    Lamont, A.

    2001-03-01

    This paper evaluates the accuracy of a network economic modeling approach in designing energy systems having renewable and conventional generators. The network approach models the system as a network of processes such as demands, generators, markets, and resources. The model reaches a solution by exchanging prices and quantity information between the nodes of the system. This formulation is very flexible and takes very little time to build and modify models. This paper reports an experiment designing a system with photovoltaic and base and peak fossil generators. The level of PV penetration as a function of its price and the capacities of the fossil generators were determined using the network approach and using an exact, analytic approach. It is found that the two methods agree very closely in terms of the optimal capacities and are nearly identical in terms of annual system costs.

  12. Long-term generation scheduling of Xiluodu and Xiangjiaba cascade hydro plants considering monthly streamflow forecasting error

    International Nuclear Information System (INIS)

    Xie, Mengfei; Zhou, Jianzhong; Li, Chunlong; Zhu, Shuang

    2015-01-01

    Highlights: • Monthly streamflow forecasting error is considered. • An improved parallel progressive optimality algorithm is proposed. • Forecasting dispatching chart is manufactured accompanying with a set of rules. • Applications in Xiluodu and Xiangjiaba cascade hydro plants. - Abstract: Reliable streamflow forecasts are very significant for reservoir operation and hydropower generation. But for monthly streamflow forecasting, the forecasting result is unreliable and it is hard to be utilized, although it has a certain reference value for long-term hydro generation scheduling. Current researches mainly focus on deterministic scheduling, and few of them consider the uncertainties. So this paper considers the forecasting error which exists in monthly streamflow forecasting and proposes a new long-term hydro generation scheduling method called forecasting dispatching chart for Xiluodu and Xiangjiaba cascade hydro plants. First, in order to consider the uncertainties of inflow, Monte Carlo simulation is employed to generate streamflow data according to the forecasting value and error distribution curves. Then the large amount of data obtained by Monte Carlo simulation is used as inputs for long-term hydro generation scheduling model. Because of the large amount of streamflow data, the computation speed of conventional algorithm cannot meet the demand. So an improved parallel progressive optimality algorithm is proposed to solve the long-term hydro generation scheduling problem and a series of solutions are obtained. These solutions constitute an interval set, unlike the unique solution in the traditional deterministic long-term hydro generation scheduling. At last, the confidence intervals of the solutions are calculated and forecasting dispatching chart is proposed as a new method for long-term hydro generation scheduling. A set of rules are proposed corresponding to forecasting dispatching chart. The chart is tested for practical operations and achieves

  13. MULTIREGION: a simulation-forecasting model of BEA economic area population and employment. [Bureau of Economic Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, R.J.; Westley, G.W.; Herzog, H.W. Jr.; Kerley, C.R.; Bjornstad, D.J.; Vogt, D.P.; Bray, L.G.; Grady, S.T.; Nakosteen, R.A.

    1977-10-01

    This report documents the development of MULTIREGION, a computer model of regional and interregional socio-economic development. The MULTIREGION model interprets the economy of each BEA economic area as a labor market, measures all activity in terms of people as members of the population (labor supply) or as employees (labor demand), and simultaneously simulates or forecasts the demands and supplies of labor in all BEA economic areas at five-year intervals. In general the outputs of MULTIREGION are intended to resemble those of the Water Resource Council's OBERS projections and to be put to similar planning and analysis purposes. This report has been written at two levels to serve the needs of multiple audiences. The body of the report serves as a fairly nontechnical overview of the entire MULTIREGION project; a series of technical appendixes provide detailed descriptions of the background empirical studies of births, deaths, migration, labor force participation, natural resource employment, manufacturing employment location, and local service employment used to construct the model.

  14. p-TSA/Base-Promoted Propargylation/Cyclization of β-Ketothioamides for the Regioselective Synthesis of Highly Substituted (Hydro)thiophenes.

    Science.gov (United States)

    Nandi, Ganesh Chandra; Singh, Maya Shankar

    2016-07-15

    Metal-free, p-toluenesulfonic acid (p-TSA)-mediated, straightforward propargylation of β-ketothioamides with aryl propargyl alcohol has been achieved at room temperature. In addition, the reaction also provided thiazole rings as byproducts. Furthermore, the propargylated thioamides undergo intramolecular 1,5-cyclization to afford fully substituted (hydro)thiophenes in the presence of base. Notably, the approach is pot, atom, and step economical (PASE).

  15. Fouling in small hydro projects; Verschmutzung von Kleinwasserkraftwerken - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Abgottspon, A.; Staubli, T.

    2010-03-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at fouling problems encountered in small hydro installations. The report is based on ten interviews made with operators of small hydro power stations in Switzerland. A parallel project carried out in Germany is mentioned. A large variation in the degree of fouling in the various hydro power stations is noted. Sources such as leaves in autumn and algae are discussed, as are the various rinsing procedures used to clear the turbines of fouling. Power losses are discussed and measures that can be taken to prevent fouling are described. Measurements made at an installation in Freienstein, Switzerland, are presented and discussed. The report is completed with an appendix containing calculations, details on the Freienstein power plant and the results of interviews made with the ten hydro power installations examined.

  16. Models of Economic Analysis

    OpenAIRE

    Adrian Ioana; Tiberiu Socaciu

    2013-01-01

    The article presents specific aspects of management and models for economic analysis. Thus, we present the main types of economic analysis: statistical analysis, dynamic analysis, static analysis, mathematical analysis, psychological analysis. Also we present the main object of the analysis: the technological activity analysis of a company, the analysis of the production costs, the economic activity analysis of a company, the analysis of equipment, the analysis of labor productivity, the anal...

  17. Investigation research on the evaluation of a coupled thermo-hydro-mechanical-chemical phenomena. Outline report

    International Nuclear Information System (INIS)

    Chijimatsu, Masakazu; Amemiya, Kiyoshi; Neyama, Atsushi; Iwata, Hiroshi; Nakagawa, Koichi; Ishihara, Yoshinao; Shiozaki, Isao; Sagawa, Hiroshi

    2002-02-01

    In order to realize a coupling analysis in the near field of the geological disposal system, this study has been studied on the addition of the mass transport model to the coupled thermo-hydro-mechanical analysis code (THAMES) and preliminary coupling analysis by using development environmental tool (Diffpack) for numerical analysis. (1) In order to prepare the strategy on the addition of the mass transport model to the coupled thermo-hydro-mechanical analysis code (THAMES), we have studied on the requirement of THAMES-Transport and methodology of coupling analysis. After that we set out modification plan by the Eulerian-Lagrangian (EL) method. (2) Based on the document of modification plan, we have done addition of the mass transport model to the coupled thermo-hydro-mechanical analysis code (THAMES) and carried out verification analysis in order to confirm on the accuracy of THAMES-Transport. (3) In order to understand on the behavior of NaCl in the porewater under the coupled thermo-hydro-mechanical phenomena in the HLW engineered barrier system, we have calculated coupling phenomenon by using THAMES-Transport. Transportation and concentration phenomena of NaCl are calculated but precipitation of NaCl is not occurred under the analysis conditions in this report. (4) In order to confirm about feasibility of coupling analysis under the development environmental tool (Diffpack) for numerical analysis, we have carried out on the design work and writing program of the preliminary coupling system. In this study, we have adopted existing transport model (HYDROGEOCHEM) and geochemical model (phreeqe60) for preliminary coupling system. (5) In order to confirm program correctness of preliminary coupling system, we have carried out benchmarking analysis by using existing reactive-transport analysis code (HYDROGEOCHEM). (6) We have been prepared short-range development plan based on through the modification study of THAMES and writing program of the preliminary coupling

  18. Investigation research on the evaluation of a coupled thermo-hydro-mechanical-chemical phenomena. Result report

    International Nuclear Information System (INIS)

    Chijimatsu, Masakazu; Amemiya, Kiyoshi; Shiozaki, Isao; Neyama, Atsushi; Iwata, Hiroshi; Nakagawa, Koichi; Ishihara, Yoshinao; Sagawa, Hiroshi

    2002-02-01

    In order to realize a coupling analysis in the near field of the geological disposal system, this study has been studied on the addition of the mass transport model to the coupled thermo-hydro-mechanical analysis code (THAMES) and preliminary coupling analysis by using development environmental tool (Diffpack) for numerical analysis. (1) In order to prepare the strategy on the addition of the mass transport model to the coupled thermo-hydro-mechanical analysis code (THAMES), we have studied on the requirement of THAMES-Transport and methodology of coupling analysis. After that we set out modification plan by the Eulerian-Lagrangian (EL) method. (2) Based on the document of modification plan, we have done addition of the mass transport model to the coupled thermo-hydro-mechanical analysis code (THAMES) and carried out verification analysis in order to confirm on the accuracy of THAMES-Transport. (3) In order to understand on the behavior of NaCl in the porewater under the coupled thermo-hydro-mechanical phenomena in the HLW engineered barrier system, we have calculated coupling phenomenon by using THAMES-Transport. Transportation and concentration phenomena of NaCl are calculated but precipitation of NaCl is not occurred under the analysis conditions in this report. (4) In order to confirm about feasibility of coupling analysis under the development environmental tool (Diffpack) for numerical analysis, we have carried out on the design work and writing program of the preliminary coupling system. In this study, we have adopted existing transport model (HYDROGEOCHEM) and geochemical model (phreeqe 60) for preliminary coupling system. (5) In order to confirm program correctness of preliminary coupling system, we have carried out benchmarking analysis by using existing reactive-transport analysis code (HYDROGEOCHEM). (6) We have been prepared short-range development plan based on through the modification study of THAMES and writing program of the preliminary coupling

  19. Hydro-Quebec's Strategic Plan 2002-2006 : summary

    International Nuclear Information System (INIS)

    2001-01-01

    A corporate profile of Hydro-Quebec was presented and the strategy that the utility will adopt for the 2002-2006 period was summarized. The utility plans to maintain its service quality and sustain environmental quality while developing a world class enterprise. Quebec has adopted a heritage pool giving Quebec consumers access to a maximum of 165 TWh of electricity per year at an average commodity rate of 2.79 cents per kilowatt-hour, the lowest rate for such a large amount of energy in North America. Above that volume, supply for the Quebec market will be ensured through competitive bidding, leading to the signing of supply contracts based on market price. Hydro-Quebec's strategy reflects the business opportunities open to Hydro-Quebec given its traditional activities in the province, the restructuring of North American energy markets, and the emergence of Quebec as a major energy hub. The business opportunities come from the fact that demand for electricity in Quebec is growing and from the opening of markets close to Quebec. Investment outlook in hydroelectric generation and transmission also appears to be profitable. It is likely that investment will be needed to build infrastructure. Hydro-Quebec is also working with its qualified workforce to develop a world-class international activity base. tabs., figs

  20. Modeling the economics of LLW volume reduction

    International Nuclear Information System (INIS)

    Voth, M.H.; Witzig, W.F.

    1986-01-01

    Generators of low-level (radioactive) waste (LLW) are under pressure to implement volume reduction (VR) programs for political and economic reasons. Political reasons include the appearance of generating less waste or meeting quotas. Economic reasons include avoiding high disposal costs and associated surcharges. Volume reduction results in less total volume over which fixed disposal costs are allocated and therefore higher unit costs for disposal. As numerous small compacts are developed, this often overlooked effect becomes more pronounced. The described model presents two unique significant features. First, a feedback loop considers the impact of VR on disposal rates, and second, it appeals to logic without extensive knowledge of VR technology or computer modeling. The latter feature is especially useful in conveying information to students and nontechnical decision makers, demonstrating the impact of each of a complicated set of variables with reproducible results

  1. Economic Modeling of Compressed Air Energy Storage

    Directory of Open Access Journals (Sweden)

    Rui Bo

    2013-04-01

    Full Text Available Due to the variable nature of wind resources, the increasing penetration level of wind power will have a significant impact on the operation and planning of the electric power system. Energy storage systems are considered an effective way to compensate for the variability of wind generation. This paper presents a detailed production cost simulation model to evaluate the economic value of compressed air energy storage (CAES in systems with large-scale wind power generation. The co-optimization of energy and ancillary services markets is implemented in order to analyze the impacts of CAES, not only on energy supply, but also on system operating reserves. Both hourly and 5-minute simulations are considered to capture the economic performance of CAES in the day-ahead (DA and real-time (RT markets. The generalized network flow formulation is used to model the characteristics of CAES in detail. The proposed model is applied on a modified IEEE 24-bus reliability test system. The numerical example shows that besides the economic benefits gained through energy arbitrage in the DA market, CAES can also generate significant profits by providing reserves, compensating for wind forecast errors and intra-hour fluctuation, and participating in the RT market.

  2. Your energy team : Hydro Mississauga 1998 annual report

    International Nuclear Information System (INIS)

    1999-01-01

    An operational and financial review of Hydro Mississauga for fiscal year 1998 is presented. Hydro Mississauga has been serving the municipality of Mississauga, Ontario for the past 82 years. In 1998, Hydro Mississauga went through major restructuring to include a new competitive 'Services' Division which offers a wide range of competitive products and services. Despite deregulation and restructuring, quality of service was maintained and all-time performance records were set for company safety and system reliability. Operating costs were also cut and low rates continued. The residential rate freeze will be extended for a sixth straight year into 1999. Consolidated financial statements show that in 1998 Hydro Mississauga was 100 per cent debt free. One of the top priorities for the utility in 1998 was to get ready to deal with any problem that might arise as we roll over into the year 2000. The utility has completed an inventory of all computer software and equipment and has taken measures such as remediation, testing and getting vendor assurances. tabs., figs

  3. The power of commitment : Newfoundland and Labrador Hydro 2000 annual report

    International Nuclear Information System (INIS)

    2000-01-01

    A consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) was presented with particular focus on energy production, energy sales, the Avalon Transmission upgrade, development of the Granite Canal and Hydro's dam safety program. Hydro reported a 4.5 per cent increase in gross energy production at their generating plants throughout the system. Production from hydro sources also increased by 4.5 per cent to a total of 5,032 GWh. Thermal production from the Holyrood generating facility also increased slightly to 1,040 GWh. Production for peaking and emergency requirements from gas turbines and diesel plants dropped to 0.6 GWh. In 2000, about 83 per cent of all the energy supplied to their customers came from hydro sources. Total energy sales were up 4.6 per cent during 2000. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets, liabilities and capital. tabs., figs

  4. Teaching Economics: A Cooperative Learning Model.

    Science.gov (United States)

    Caropreso, Edward J.; Haggerty, Mark

    2000-01-01

    Describes an alternative approach to introductory economics based on a cooperative learning model, "Learning Together." Discussion of issues in economics education and cooperative learning in higher education leads to explanation of how to adapt the Learning Together Model to lesson planning in economics. A flow chart illustrates the process for a…

  5. Developing teaching kit on the use of micro-hydro generator in remote area

    Directory of Open Access Journals (Sweden)

    Desak Made Megawati

    2017-04-01

    Full Text Available The study aimed at: (1 identifying the criteria of teaching kit feasibility for the advantages of micro-hydro generator in remote area; and (2 identifying the effectiveness of teaching kit implementation on the use of micro-hydro generator in remote area in order to improve the students’ concept mastery on SMP Negeri 1 Rampi South Sulawesi. The study was a research and development that adapted the 4D model, which consisted of define, design, develop, and disseminate. The teaching kit that had been developed was a syllabus, lesson plans, student’s worksheet, and assessment instrument. For the data gathering, the researcher implemented the non-test technique, in the form of product validation sheet, student’s worksheet readability questionnaire sheet, teaching implementation sheet, and test technique, in the form of concept mastery test item sheet. The results of the study show that: (1 the teaching kit on the use of micro-hydro generator in remote area that has been developed falls into the “Very Good” category for syllabus, lesson plan, and student’s worksheet; and (2 the implementation of the teaching kit on the use of micro-hydro generator in remote area has been effective to improve the students’ concept mastery in SMP Negeri 1 Rampi South Sulawesi.

  6. Full cost accounting for decision making at Ontario Hydro

    International Nuclear Information System (INIS)

    Plagiannakos, T.

    1996-01-01

    Ontario Hydro's approach to full cost accounting (FCA) was outlined in response to questions raised earlier, in another forum, regarding Ontario Hydro's views on FCA. FCA was defined as an evaluation framework (as opposed to an accounting system) which tries to account for the internal (private) as well as the external (environment and human health) costs and benefits and integrate them into business decisions. When the external impacts cannot be monetized, qualitative evaluations are used based on the damage costing approach, which Ontario Hydro prefers to the cost of control method recommended by its critics. In general, however, Ontario Hydro is not opposed to FCA in so far as it puts the Utility in a better position to make more informed decisions, improve environmental cost management, avoid future costs, enhance revenue, improve environmental quality, contribute to environmental policy, and contribute to sustainable development. 1 fig

  7. An Integrated Economic-Organizational Model of the Enterprises in the Development of Information Technologies

    Directory of Open Access Journals (Sweden)

    Polyakov Maxym V.

    2017-09-01

    Full Text Available The article is aimed at building an integrated economic-organizational model of the information technologies developing enterprises in order to choose the best technology, production process, production through adjustment or replacement of the business model on the basis of a balanced scorecard, a business model template, and the cognitive model of the IT enterprise development management. The possibility to bind a business model to a strategic goal has been identified, thus providing for quantifying the business model. The article presents a generalized cognitive map of the information technologies developing enterprise, which includes three levels: strategic level, business model level, and development management level. The distribution of the indicators to three levels allows for the consideration of changing the way in which strategic objectives are achieved by changing the business model. However, the indicators, which can be managed by the enterprise itself, remain unchanged. Prospect for further research in this direction is to find indicators for quantifying all levels of the integrated economic-organizational model of the enterprises in the development of information technologies and to substantiate the relationship between them.

  8. Economic crisis and levels of political participation in Europe (2002-2010): the role of resources and grievances

    NARCIS (Netherlands)

    Kern, A.; Marien, S.; Hooghe, M.

    2015-01-01

    This article examines the effect of the recent economic crisis on political participation levels in Europe. As the civic voluntarism model and grievances theory predict different effects of economic downturn on political participation, the crisis provides a unique context to evaluate the explanatory

  9. Workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. Part II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The publication has been set up as proceedings of the workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. The proceedings consist of the following chapters: (1) Use of a part and a secondary hydroenergetic potential of the Slovak Republic for electric energy production and its impact on the environment; (2) Economic problems of utilization of hydroenergetic potential of the Slovak Republic and possibilities for their solution; (3) Modernization of control systems of primary and secondary hydro energetic sources of electricity from the point of view of their fulfillment of important functions in operation of a power engineering system in the Slovak Republic; (4) The most important structures utilizing primary and secondary hydroenergetic potential for electric energy production; (5) Progressive technologies, modernization of hydro power projects aimed at rationalization in a use of hydroenergetic potential and environment protection; (6) Possibilities of further utilization of hydroenergetic potential of the Slovak Republic.

  10. Workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. Part II

    International Nuclear Information System (INIS)

    1997-01-01

    The publication has been set up as proceedings of the workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. The proceedings consist of the following chapters: (1) Use of a part and a secondary hydroenergetic potential of the Slovak Republic for electric energy production and its impact on the environment; (2) Economic problems of utilization of hydroenergetic potential of the Slovak Republic and possibilities for their solution; (3) Modernization of control systems of primary and secondary hydro energetic sources of electricity from the point of view of their fulfillment of important functions in operation of a power engineering system in the Slovak Republic; (4) The most important structures utilizing primary and secondary hydroenergetic potential for electric energy production; (5) Progressive technologies, modernization of hydro power projects aimed at rationalization in a use of hydroenergetic potential and environment protection; (6) Possibilities of further utilization of hydroenergetic potential of the Slovak Republic

  11. Petroleum Refinery Jobs and Economic Development Impact (JEDI) Model User Reference Guide

    Energy Technology Data Exchange (ETDEWEB)

    Goldberg, Marshall [MRG and Associates, Nevada City, CA (United States)

    2013-12-31

    The Jobs and Economic Development Impact (JEDI) models, developed through the National Renewable Energy Laboratory (NREL), are user-friendly tools utilized to estimate the economic impacts at the local level of constructing and operating fuel and power generation projects for a range of conventional and renewable energy technologies. The JEDI Petroleum Refinery Model User Reference Guide was developed to assist users in employing and understanding the model. This guide provides information on the model's underlying methodology, as well as the parameters and references used to develop the cost data utilized in the model. This guide also provides basic instruction on model add-in features, operation of the model, and a discussion of how the results should be interpreted. Based on project-specific inputs from the user, the model estimates job creation, earning and output (total economic activity) for a given petroleum refinery. This includes the direct, indirect and induced economic impacts to the local economy associated with the refinery's construction and operation phases. Project cost and job data used in the model are derived from the most current cost estimations available. Local direct and indirect economic impacts are estimated using economic multipliers derived from IMPLAN software. By determining the regional economic impacts and job creation for a proposed refinery, the JEDI Petroleum Refinery model can be used to field questions about the added value refineries may bring to the local community.

  12. From Psycho-Economics to Neuro-Economics

    OpenAIRE

    Bernard WALLISER

    2012-01-01

    In economics, three nested organizational levels, namely behavioural, mental and neural, can be distinguished. They introduce specific theoretical or observable concepts and suggest their own models for choice making. If psycho-economics relates implemented actions to declared mental states, neuro-economics relates mental states to brain areas. Bridge principles can be defined which link concepts with similar interpretations at two successive levels. Thanks to these principles, relations or e...

  13. Simulation model for wind energy storage systems. Volume I. Technical report. [SIMWEST code

    Energy Technology Data Exchange (ETDEWEB)

    Warren, A.W.; Edsinger, R.W.; Chan, Y.K.

    1977-08-01

    The effort developed a comprehensive computer program for the modeling of wind energy/storage systems utilizing any combination of five types of storage (pumped hydro, battery, thermal, flywheel and pneumatic). An acronym for the program is SIMWEST (Simulation Model for Wind Energy Storage). The level of detail of SIMWEST is consistent with a role of evaluating the economic feasibility as well as the general performance of wind energy systems. The software package consists of two basic programs and a library of system, environmental, and load components. Volume I gives a brief overview of the SIMWEST program and describes the two NASA defined simulation studies.

  14. Small hydro in Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2011-10-01

    Full Text Available hydro, the author has started an online database of small hydropower projects in eastern and southern Africa. The main aim of the database is to catalogue the current situation and to make that accessible to policymakers, project developers, as well...

  15. Vibration analysis of a hydro generator for different operating regimes

    Science.gov (United States)

    Haţiegan, C.; Pădureanu, I.; Jurcu, M.; Nedeloni, M. D.; Hamat, C. O.; Chioncel, C. P.; Trocaru, S.; Vasile, O.; Bădescu, O.; Micliuc, D.; (Filip Nedeloni, L.; Băra, A.; (Barboni Haţiegan, L.

    2017-01-01

    Based on experimental measurements, this paper presents the vibration analysis of a hydro generator that equips a Kaplan hydraulic turbine of a Hydropower plant in Romania. This analysis means vibrations measurement to different operating regimes of the hydro generator respectively before installing it and into operation, namely putting off load mode (unexcited and excited) respectively putting on load mode. By comparing, through the experimental results obtained before and after the operation of hydro aggregates are observed vibrations improvements.

  16. The economic impacts of energy efficiency

    International Nuclear Information System (INIS)

    Jean, R.

    1990-01-01

    Hydro Quebec's energy efficiency initiatives are reviewed and the economic benefits it expects to garner from such programs are described. Energy efficiency programs affect the cost of supplying electricity, and rates usually rise during the early years and are subsequently offset by the benefits the program generates. Energy efficiency programs should allow Hydro Quebec to avoid $6 billion in expenditures for electricity supply, while entailing contributions of $1.4 billion for the efficiency measures. Evaluation of the potential for efficiency has allowed Hydro Quebec to set a target of 12.9 TWh/y in 1999 on a potential estimated at 18% of regular sales in Quebec in 1989, namely 23.3 TWh. Customers, who contribute $1.4 billion of their own funds to efficiency programs will realize savings of $3.2 billion. Hydro Quebec programs insist strongly on replacement of appliances and motors of all sorts, and in the residential sector, purchases of slightly less than $0.5 billion will consist of electric lamps (3%), water heaters (2.4%), insulation products (32%), hardware (2.5%), and various electric appliances (33%). In the commercial sector, expenditures will be higher, reaching ca $650 million. These are allocated to purchases of electric lamps (18%), heating equipment (12%), insulation products (24%), street lighting (4%), and various electric devices such as controls (39%). 2 figs., 4 tabs

  17. Economic impacts of urban flooding in South Florida: Potential consequences of managing groundwater to prevent salt water intrusion.

    Science.gov (United States)

    Czajkowski, Jeffrey; Engel, Vic; Martinez, Chris; Mirchi, Ali; Watkins, David; Sukop, Michael C; Hughes, Joseph D

    2018-04-15

    High-value urban zones in coastal South Florida are considered particularly vulnerable to salt water intrusion into the groundwater-based, public water supplies caused by sea level rise (SLR) in combination with the low topography, existing high water table, and permeable karst substrate. Managers in the region closely regulate water depths in the extensive South Florida canal network to control closely coupled groundwater levels and thereby reduce the risk of saltwater intrusion into the karst aquifer. Potential SLR adaptation strategies developed by local managers suggest canal and groundwater levels may have to be increased over time to prevent the increased salt water intrusion risk to groundwater resources. However, higher canal and groundwater levels cause the loss of unsaturated zone storage and lead to an increased risk of inland flooding when the recharge from rainfall exceeds the capacity of the unsaturated zone to absorb it and the water table reaches the surface. Consequently, higher canal and groundwater levels are also associated with increased risk of economic losses, especially during the annual wet seasons. To help water managers and urban planners in this region better understand this trade-off, this study models the relationships between flood insurance claims and groundwater levels in Miami-Dade County. Via regression analyses, we relate the incurred number of monthly flood claims in 16 Miami-Dade County watersheds to monthly groundwater levels over the period from 1996 to 2010. We utilize these estimated statistical relationships to further illustrate various monthly flood loss scenarios that could plausibly result, thereby providing an economic quantification of a "too much water" trade-off. Importantly, this understanding is the first of its kind in South Florida and is exceedingly useful for regional-scale hydro-economic optimization models analyzing trade-offs associated with high water levels. Copyright © 2017 Elsevier B.V. All rights

  18. More than energy: Ontario Hydro final annual report, January 1998 - March 1999

    International Nuclear Information System (INIS)

    1999-01-01

    Ontario Hydro ceased operations on March 31, 1999 and its assets and functions were transferred by provincial statute to two successor corporations: Ontario Power Generation Corp. (OPG) and Ontario Hydro Services Inc. Its functions were also transferred to the Independent Electricity Market Operator and the Electrical Safety Authority, two not-for-profit agencies. The original act defining Ontario Hydro was replaced by the Energy Competition Act, 1998. Until the demerger of the company on April 1, 1999, Ontario Hydro served 108 direct industrial clients, almost one million retail clients and 255 municipal utilities. Ontario Power Generation inherited Ontario Hydro's generating portfolio, making it one of the largest power producers in North America in terms of installed capacity. The OPG system includes 69 hydroelectric stations, three nuclear sites, and six operating fossil fueled stations. Total installed system capacity is approximately 31,000 megawatts, and Ontario Hydro's total sales in 1998 were almost 139 terawatt hours. Ontario Hydro Services Company is an energy services-based transmission and distribution company. It owns and maintains 29,000 km of transmission lines, 114,700 km of distribution lines, 245 km of high-voltage underground cable, 256 transformer stations, 928 distribution and regulation stations, and 250 microwave stations. It also retains the retail business held by Ontario Hydro, which serves over 950,000 clients, and the transmission and generating business for 23 remote communities in Northern Ontario

  19. HTGR Application Economic Model Users' Manual

    Energy Technology Data Exchange (ETDEWEB)

    A.M. Gandrik

    2012-01-01

    The High Temperature Gas-Cooled Reactor (HTGR) Application Economic Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Application Economic Model calculates either the required selling price of power and/or heat for a given internal rate of return (IRR) or the IRR for power and/or heat being sold at the market price. The user can generate these economic results for a range of reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for up to 16 reactor modules; and for module ratings of 200, 350, or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Application Economic Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Application Economic Model. This model was designed for users who are familiar with the HTGR design and Excel and engineering economics. Modification of the HTGR Application Economic Model should only be performed by users familiar with the HTGR and its applications, Excel, and Visual Basic.

  20. B.C. Hydro : 1997 annual report

    International Nuclear Information System (INIS)

    1997-01-01

    Operating and financial information from B.C. Hydro for 1997 is presented. B.C. Hydro is the third largest electric utility in Canada. The utility generates between 43,000 and 54,000 gigawatt-hours of electricity annually. More than 80 per cent of the electricity is produced by major hydroelectric generating stations on the Columbia and Peace rivers. This report presents a picture of improved financial performance, details of all revenues and expenditures and capsule summaries of the Utility's operations. The report also addresses issues regarding strategic direction, local and international competition, and consultation and regulatory activities. tabs. and figs