WorldWideScience

Sample records for lessons learned operation

  1. Feedback of safety - related operational experience: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Elias, D [Commonwealth Edison Co. (United States)

    1997-09-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues.

  2. Feedback of safety - related operational experience: Lessons learned

    International Nuclear Information System (INIS)

    Elias, D.

    1997-01-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues

  3. TFTR tritium operations lessons learned

    International Nuclear Information System (INIS)

    Gentile, C.A.; Raftopoulos, S.; LaMarche, P.

    1996-01-01

    The Tokamak Fusion Test Reactor which is the progenitor for full D-T operating tokamaks has successfully processed > 81 grams of tritium in a safe and efficient fashion. Many of the fundamental operational techniques associated with the safe movement of tritium through the TFTR facility were developed over the course of many years of DOE tritium facilities (LANL, LLNL, SRS, Mound). In the mid 1980's The Tritium Systems Test Assembly (TSTA) at LANL began reporting operational techniques for the safe handling of tritium, and became a major conduit for the transfer of safe tritium handling technology from DOE weapons laboratories to non-weapon facilities. TFTR has built on many of the TSTA operational techniques and has had the opportunity of performing and enhancing these techniques at America's first operational D-T fusion reactor. This paper will discuss negative pressure employing 'elephant trunks' in the control and mitigation of tritium contamination at the TFTR facility, and the interaction between contaminated line operations and Δ pressure control. In addition the strategy employed in managing the movement of tritium through TFTR while maintaining an active tritium inventory of < 50,000 Ci will be discussed. 5 refs

  4. Spent Fuel Storage Operation - Lessons Learned

    International Nuclear Information System (INIS)

    2013-12-01

    Experience gained in planning, constructing, licensing, operating, managing and modifying spent fuel storage facilities in some Member States now exceeds 50 years. Continual improvement is only achieved through post-project review and ongoing evaluation of operations and processes. This publication is aimed at collating and sharing lessons learned. Hopefully, the information provided will assist Member States that already have a developed storage capability and also those considering development of a spent nuclear fuel storage capability in making informed decisions when managing their spent nuclear fuel. This publication is expected to complement the ongoing Coordinated Research Project on Spent Fuel Performance Assessment and Research (SPAR-III); the scope of which prioritizes facility operational practices in lieu of fuel and structural components behaviour over extended durations. The origins of the current publication stem from a consultants meeting held on 10-12 December 2007 in Vienna, with three participants from the IAEA, Slovenia and USA, where an initial questionnaire on spent fuel storage was formulated (Annex I). The resultant questionnaire was circulated to participants of a technical meeting, Spent Fuel Storage Operations - Lessons Learned. The technical meeting was held in Vienna on 13-16 October 2008, and sixteen participants from ten countries attended. A consultants meeting took place on 18-20 May 2009 in Vienna, with five participants from the IAEA, Slovenia, UK and USA. The participants reviewed the completed questionnaires and produced an initial draft of this publication. A third consultants meeting took place on 9-11 March 2010, which six participants from Canada, Hungary, IAEA, Slovenia and the USA attended. The meeting formulated a second questionnaire (Annex II) as a mechanism for gaining further input for this publication. A final consultants meeting was arranged on 20-22 June 2011 in Vienna. Six participants from Hungary, IAEA, Japan

  5. Combat Trauma Lessons Learned from Military Operations of 2001 - 2013

    Science.gov (United States)

    2015-03-09

    suspected tension pneumothorax  Longer needle for needle decompression  Lateral approach for needle decompression  Vented chest seals for open...Defense Health Board Combat Trauma Lessons Learned from Military Operations of 2001-2013 March 9, 2015 OFFICE OF THE ASSISTANT SECRETARY OF...

  6. Vitrification operational experiences and lessons learned at the WVDP

    International Nuclear Information System (INIS)

    Hamel, W.F. Jr.; Sheridan, M.J.; Valenti, P.J.

    1997-01-01

    The Vitrification Facility (VF) at the West Valley Demonstration Project (WVDP) commenced full, high-level radioactive waste (HLW) processing activities in July 1996. The HLW consists of a blend of washed plutonium-uranium extraction (PUREX) sludge, neutralized thorium extraction (THOREX) waste, and cesium-loaded zeolite. The waste product is borosilicate glass contained in stainless steel canisters, sealed for eventual disposal in a federal repository. This paper discusses the WVDP vitrification process, focusing on operational experience and lessons learned during the first year of continuous, remote operation

  7. Operational experience - Lessons learned from IRS-reports in Germany

    International Nuclear Information System (INIS)

    Wetzel, N.; Maqua, M.

    2005-01-01

    The international Incident Reporting System (IRS), jointly operated by IAEA and OECD-NEA, is a main source of safety significant findings and lessons learned of nuclear operating experience. GRS (Gesellschaft fuer Anlagen- und Reaktorsicherheit mbH) is a scientific-technical expert and research organisation. On Behalf of the Federal Minister of Environment, Nature Conservation and Reactor Safety (BMU), GRS provides the IRS officer. The evaluation of IRS-Reports and the dissemination of the main findings including the assessment of the relevance for German NPPs is task of GRS. The value of IRS is among experts undoubted. But nevertheless, the reporting to IRS decreases since some years. This presentation is aimed to show the support of IRS in strengthening the safety of German NPPs. The evaluation of IRS-Reports at GRS is three-fold. It comprises initial screening, quarterly and yearly reporting and the development of specific German Information Notices on safety significant events with direct applicability to German NPPs. Some examples of lessons learned from recent international events are discussed below. These examples shall demonstrate that the use of the IRS enhances significantly the knowledge on operational events. (author)

  8. Case Study of Lessons Learned from the Operation of the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Wootan, D.; Omberg, R.; Grandy, C.

    2016-01-01

    Full text: The lessons learned approach being followed at the Fast Flux Test Facility is to have domain experts in each subject area develop a short write-up or report on each lesson learned. Each lesson learned write-up is on the order of 4–6 pages. Longer reports can be developed as needed. Each lessons learned summary discusses the problem and the resolution method employed to address the problem, and also tries to capture the essential “tacit knowledge” associated with each topic in a focused manner. All lessons learned write-ups are supported by more detailed documents. For example, references of more detailed reports are generally included, where available. Topics are selected as those most likely to apply to future design or operating problems. This lessons learned approach has been successful in capturing essential tacit knowledge about key events in FFTF history and providing a context for interpreting the existing data and references. (author

  9. Lessons learned bulletin

    International Nuclear Information System (INIS)

    1994-05-01

    During the past four years, the Department of Energy -- Savannah River Operations Office and the Westinghouse Savannah River Company (WSRC) Environmental Restoration (ER) Program completed various activities ranging from waste site investigations to closure and post closure projects. Critiques for lessons learned regarding project activities are performed at the completion of each project milestone, and this critique interval allows for frequent recognition of lessons learned. In addition to project related lessons learned, ER also performs lessons learned critiques. T'he Savannah River Site (SRS) also obtains lessons learned information from general industry, commercial nuclear industry, naval nuclear programs, and other DOE sites within the complex. Procedures are approved to administer the lessons learned program, and a database is available to catalog applicable lessons learned regarding environmental remediation, restoration, and administrative activities. ER will continue to use this database as a source of information available to SRS personnel

  10. Lessons Learned from Developing and Operating the Kepler Science Pipeline and Building the TESS Science Pipeline

    Science.gov (United States)

    Jenkins, Jon M.

    2017-01-01

    The experience acquired through development, implementation and operation of the KeplerK2 science pipelines can provide lessons learned for the development of science pipelines for other missions such as NASA's Transiting Exoplanet Survey Satellite, and ESA's PLATO mission.

  11. Lessons Learned from Missing Flooding Barriers Operating Experience

    International Nuclear Information System (INIS)

    Simic, Z.; Veira, M. P.

    2016-01-01

    time or they do not provide sufficient instructions. Most of the events are related to deficiencies discovered during walk-down, review, maintenance and sometimes to incidents. Perhaps these lessons learned from recent events could help filling the missing gap to have most complete flooding protection. This paper presents results from the most recent activity related to the operational experience feedback for the nuclear power plant safety in the EC JRC Clearinghouse. (author).

  12. Lessons Learned for Planning and Estimating Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  13. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    Science.gov (United States)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  14. Lessons learned from MELOX plant operation and support to design of new MOX fuel fabrication plants

    International Nuclear Information System (INIS)

    Tourre, Joel; Gattegno, Robert; Guay, Philippe; Bariteau, Jean-Pierre

    2005-01-01

    AREVA is participating in the design of the US MOX Fuel Fabrication Facility (MFFF). To support this project and allow the U.S. Department of Energy (DOE) client to reap full benefit from the MELOX operating experience, AREVA, through COGEMA and its engineering subsidiary SGN have implemented a rigorous process to prudently apply MELOX Lessons Learned to the MFFF design. This paper describes the Lessons Learned process, how the process supports the advancement of fuel fabrication technology and, how the results of the process are benefiting the client. (author)

  15. Lessons learned from operating experience, maintenance procedures and training measures

    International Nuclear Information System (INIS)

    Guttner, K.; Gronau, D.

    2003-01-01

    Training programmes for nuclear facility personnel as a result of the developing phase of SAT have to be approved in the subsequent implementation and evaluation phases with the consequence of several feedback activities in the whole training process. The effectiveness of this procedure has to be evaluated especially with respect to an improvement of safety culture, shorter outage times or better plant performance, resulting in a smaller number of incidents due to human failures. The first two arguments are directly connected with all types of maintenance work in a nuclear power plant and the related preparatory training measures. The reduction of incidents due to human failures is the result of different influences, i.e. training of the operational as well as of the maintenance personnel together with changes of the operating procedures or system design. Though an evaluation of the training process should always be based on a clear definition of criteria by which the fulfilment of the learning objectives can be measured directly, the real effectiveness of training is proven by the behaviour and attitude of the personnel which can only be taken from indirect indicators. This is discussed in more detail for some examples being partly related to the above mentioned arguments. An excellent plant performance, representing a general objective of all activities, can be analysed by the changed number and reasons of incidents in a plant during its operation time. Two further examples are taken from the reactor service field where there is a tendency to reduce the individual dose rates by changed devices and/or procedures as an output from training experience with mockups. Finally the rationalisation of refresher training for operational personnel by the use of interactive teaching programs (Computer Based Training - CBT) is presented which integrate learning objectives together with a test module. (author)

  16. Lesson Learned from the Recent Operating Experience of Domestic Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Chang-Ju; Kim, Min-Chull; Koo, Bon-Hyun; Kim, Sang-Jae; Lee, Kyung-Won; Kim, Ji-Tae; Lee, Durk-Hun

    2007-01-01

    According to the public concerns, it seems that one of the main missions of a nuclear regulatory body is to collect operational experiences from various nuclear facilities, and to analyze their follow-up information. The extensive use of lessons learned from operating experiences to back fit safety systems, improve operator training and emergency procedures, and to focus more attention on human factors, safety culture and quality management systems are also desired. Collecting operational experiences has been mainly done regarding the incidents and major failures of components (so called 'event'), which usually demands lots of regulatory resources. This paper concentrates on new information, i.e. lesson learned from recent investigation results of domestic events which contain 5 years' experience. This information can induce many insights for improving operational safety of nuclear power plants (NPPs)

  17. EOS MLS Lessons Learned: Design Ideas for Safer and Lower Cost Operations

    Science.gov (United States)

    Miller, Dominick

    2012-01-01

    The Earth Observing System (EOS) Microwave Limb Sounder (MLS) is a complex instrument with a front end computer and 32 subsystem computers. MLS is one of four instruments on NASA's EOS Aura spacecraft With almost 8 years in orbit, MLS has a few lessons learned which can be applied during the design phase of future instruments to effect better longevity, more robust operations and a significant cost benefit during operations phase.

  18. Noncombatant Evacuation Operations: Department of State’s Lessons Learned Program

    Science.gov (United States)

    2016-06-10

    means for utilizing the lessons learned, in some form of rehearsal or exercise, will 4 make the lessons learned meaningful. A lesson should only...required by DOS policy. The Department agreed with the recommendations to establish certain procedures to address the need to constantly 44 update...doctrine.31 Futch also explained that CALL is constantly seeking to expand training and educational efforts about the lessons learned process and

  19. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  20. Lessons learned from NMSG-085 CIG Land Operation demonstration

    NARCIS (Netherlands)

    Gautreau, B.; Remmersmann, T.; Henderson, H.C.; Reus, N.M. de; Khimeche, L.; Pedersen, E.; Lillesoe, J.; Liberg, D.

    2013-01-01

    This paper presents the experience gained during demonstrations carried out between Denmark, France, Germany, the Netherlands and Spain under the umbrella of the NMSG-085 / CIG Land Operation group. The demonstration, also presented in this paper, focuses on command post exercise training. It

  1. Lessons Learned from Sandia National Laboratories' Operational Readiness Review of the Annular Core Research Reactor (ACRR)

    International Nuclear Information System (INIS)

    Bendure, Albert O.; Bryson, James W.

    1999-01-01

    The Sandia ACRR (a Hazard Category 2 Nuclear Reactor Facility) was defueled in June 1997 to modify the reactor core and control system to produce medical radioisotopes for the Department of Energy (DOE) Isotope Production Program. The DOE determined that an Operational Readiness Review (ORR) was required to confirm readiness to begin operations within the revised safety basis. This paper addresses the ORR Process, lessons learned from the Sandia and DOE ORRS of the ACRR, and the use of the ORR to confirm authorization basis implementation

  2. Lessons Learned

    Directory of Open Access Journals (Sweden)

    Amanda Phelan BNS, MSc, PhD

    2015-03-01

    Full Text Available The public health nurses’ scope of practice explicitly includes child protection within their role, which places them in a prime position to identify child protection concerns. This role compliments that of other professions and voluntary agenices who work with children. Public health nurses are in a privileged position as they form a relationship with the child’s parent(s/guardian(s and are able to see the child in its own environment, which many professionals cannot. Child protection in Ireland, while influenced by other countries, has progressed through a distinct pathway that streamlined protocols and procedures. However, despite the above serious failures have occurred in the Irish system, and inquiries over the past 20 years persistently present similar contributing factors, namely, the lack of standardized and comprehensive service responses. Moreover, poor practice is compounded by the lack of recognition of the various interactional processes taking place within and between the different agencies of child protection, leading to psychological barriers in communication. This article will explore the lessons learned for public health nurses practice in safeguarding children in the Republic of Ireland.

  3. Lesson Learning at JPL

    Science.gov (United States)

    Oberhettinger, David

    2011-01-01

    A lessons learned system is a hallmark of a mature engineering organization A formal lessons learned process can help assure that valuable lessons get written and published, that they are well-written, and that the essential information is "infused" into institutional practice. Requires high-level institutional commitment, and everyone's participation in gathering, disseminating, and using the lessons

  4. Designing and Operating for Safeguards: Lessons Learned From the Rokkasho Reprocessing Plant (RRP)

    International Nuclear Information System (INIS)

    Johnson, Shirley J.; Ehinger, Michael

    2010-01-01

    This paper will address the lessons learned during the implementation of International Atomic Energy Agency (IAEA) safeguards at the Rokkasho Reprocessing Plant (RRP) which are relevant to the issue of 'safeguards by design'. However, those lessons are a result of a cumulative history of international safeguards experiences starting with the West Valley reprocessing plant in 1969, continuing with the Barnwell plant, and then with the implementation of international safeguards at WAK in Germany and TRP in Japan. The design and implementation of safeguards at RRP in Japan is the latest and most challenging that the IAEA has faced. This paper will discuss the work leading up to the development of a safeguards approach, the design and operating features that were introduced to improve or aid in implementing the safeguards approach, and the resulting recommendations for future facilities. It will provide an overview of how 'safeguardability' was introduced into RRP.

  5. Designing and Operating for Safeguards: Lessons Learned From the Rokkasho Reprocessing Plant (RRP)

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Shirley J.; Ehinger, Michael

    2010-08-07

    This paper will address the lessons learned during the implementation of International Atomic Energy Agency (IAEA) safeguards at the Rokkasho Reprocessing Plant (RRP) which are relevant to the issue of ‘safeguards by design’. However, those lessons are a result of a cumulative history of international safeguards experiences starting with the West Valley reprocessing plant in 1969, continuing with the Barnwell plant, and then with the implementation of international safeguards at WAK in Germany and TRP in Japan. The design and implementation of safeguards at RRP in Japan is the latest and most challenging that the IAEA has faced. This paper will discuss the work leading up to the development of a safeguards approach, the design and operating features that were introduced to improve or aid in implementing the safeguards approach, and the resulting recommendations for future facilities. It will provide an overview of how ‘safeguardability’ was introduced into RRP.

  6. Remote dismantlement tasks for the CP5 reactor: Implementation, operations, and lessons learned

    International Nuclear Information System (INIS)

    Noakes, M.W.

    1998-01-01

    This paper presents a developer's perspective on lessons learned from one example of the integration of new prototype technology into a traditional operations environment. The dual arm work module was developed by the Robotics Technology Development Program as a research and development activity to examine manipulator controller modes and deployment options. It was later reconfigured for the dismantlement of the Argonne National Laboratory Chicago Pile number-sign 5 reactor vessel as the crane-deployed dual arm work platform. Development staff worked along side operations staff during a significant part of the deployment to provide training, maintenance, and tooling support. Operations staff completed all actual remote dismantlement tasks. At the end of available development support funding, the Dual Arm Work Platform was turned over to the operations staff, who is still using it to complete their dismantlement tasks

  7. Lessons learned from the Maintenance Rule implementation at Northeast Utilities operating plants

    International Nuclear Information System (INIS)

    Hastings, K.B.; Khalil, Y.F.; Johnson, W.

    1996-01-01

    The Maintenance Rule as described in 10CFR50.65 requires holders of all operating nuclear power plants to monitor the performance of structures, systems, and components (SSCs) against licensee-established performance criteria. The Industry with the assistance of the Nuclear Energy Institute (NEI) developed a guideline, which includes all parts of the Maintenance Rule, to establish these performance criteria while incorporating safety and reliability of the operating plants. The NUMARC 93-01 Guideline introduced the term ''Risk Significant'' to categorize subsets of the SSCs which would require increased focus, from a Maintenance Rule perspective, in setting their performance criteria. Northeast Utilities Company (NU) operates five nuclear plants three at Millstone Station in Waterford, Connecticut; the Connecticut Yankee plant in Haddam Neck, Connecticut; and the Seabrook Station in Seabrook, New Hampshire. NU started the implementation process of the Maintenance Rule program at its five operating plants since early 1994, and have identified a population of risk significant SSCs at each plant. Recently, Northeast Utilities' Maintenance Rule Team re-examined the initial risk significant determinations to further refine these populations, and to establish consistencies among its operating units. As a result of the re-examination process, a number of inconsistencies and areas for improvement have been identified. The lessons learned provide valuable insights to consider in the future as one implements more risk based initiatives such as Graded QA and Risk-Based ISI and IST. This paper discusses the risk significance criteria, how Northeast Utilities utilized NUMARC 93-01 Guideline to determine the risk significant SSCs for its operating plants, and lessons learned. The results provided here do not include the Seabrook Station

  8. Selected Lessons Learned through the ISS Design, Development, Assembly, and Operations: Applicability to International Cooperation for Standardization

    Science.gov (United States)

    Hirsch, David B.

    2009-01-01

    This slide presentation reviews selected lessons that were learned during the design, development, assembly and operation of the International Space Station. The critical importance of standards and common interfaces is emphasized to create a common operation environment that can lead to flexibility and adaptability.

  9. Selected Lessons Learned over the ISS Design, Development, Assembly, and Operations: Applicability to International Cooperation for Standardization

    Science.gov (United States)

    Hirsch, David B.

    2010-01-01

    This slide presentation reviews some of the lessons learned in the sphere of international cooperation during the development, assembly and operation of the International Space Station. From the begining all Partners shared a common objective to build, operate and utilize a crewed laboratory in low orbit as an international partnership. The importance of standards is emphasized.

  10. Lessons Learned from Engineering a Multi-Mission Satellite Operations Center

    Science.gov (United States)

    Madden, Maureen; Cary, Everett, Jr.; Esposito, Timothy; Parker, Jeffrey; Bradley, David

    2006-01-01

    NASA's Small Explorers (SMEX) satellites have surpassed their designed science-lifetimes and their flight operations teams are now facing the challenge of continuing operations with reduced funding. At present, these missions are being re-engineered into a fleet-oriented ground system at Goddard Space Flight Center (GSFC). When completed, this ground system will provide command and control of four SMEX missions and will demonstrate fleet automation and control concepts. As a path-finder for future mission consolidation efforts, this ground system will also demonstrate new ground-based technologies that show promise of supporting longer mission lifecycles and simplifying component integration. One of the core technologies being demonstrated in the SMEX Mission Operations Center is the GSFC Mission Services Evolution Center (GMSEC) architecture. The GMSEC architecture uses commercial Message Oriented Middleware with a common messaging standard to realize a higher level of component interoperability, allowing for interchangeable components in ground systems. Moreover, automation technologies utilizing the GMSEC architecture are being evaluated and implemented to provide extended lights-out operations. This mode of operation will provide routine monitoring and control of the heterogeneous spacecraft fleet. The operational concepts being developed will reduce the need for staffed contacts and is seen as a necessity for fleet management. This paper will describe the experiences of the integration team throughout the re-enginering effort of the SMEX ground system. Additionally, lessons learned will be presented based on the team's experiences with integrating multiple missions into a fleet-automated ground system.

  11. Lessons learned related to packaging and transportation

    International Nuclear Information System (INIS)

    Wallen, C.

    1995-01-01

    The use of lessons learned as a tool for learning from past experiences is well established, especially by many organizations within the nuclear industry. Every person has, at some time, used the principles of lessons learned to adopt good work practices based on their own experiences or the experiences of others. Lessons learned can also help to avoid the recurrence of adverse practices, which is often an area that most lessons-learned programs tend to focus on. This paper will discuss how lessons learned relate to packaging and transportation issues and events experienced at Department of Energy (DOE) facilities. It will also discuss the role performed by the Office of Nuclear and Facility Safety's Office of Operating Experience Analysis and Feedback in disseminating lessons learned and operating experience feedback to the DOE complex. The central concept of lessons learned is that any organization should be able to learn from its own experiences and events. In addition, organizations should implement methodologies to scan external environments for lessons learned, to analyze and determine the relevance of lessons learned, and to bring about the necessary changes learned from these experiences. With increased concerns toward facility safety, the importance of utilizing the lessons-learned principles and the establishment of lessons-learned programs can not be overstated

  12. Opening and operating a nuclear disposal facility: lessons learned in public outreach

    International Nuclear Information System (INIS)

    Hurtt, D.; Marshall, A.; Antiporta, M.; West, C.

    2002-01-01

    Addressing the issue of nuclear waste is no small task for professional communicators. Communications need to strike the right balance between presenting scientific facts and responding to public issues, describing risks without creating unnecessary anxiety, and listening and addressing public concerns. The U.S. Department of Energy's (DOE) Carlsbad Field Office (CBFO), which operates the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, has more than 25 years of experience in communicating about deep geologic (2 150 feet) disposal of nuclear waste. While a single formula for success is unrealistic, the CBFO has identified 14 steps in its stakeholder outreach program that together provide a model for similar projects dealing with controversial issues. Bottom line, the lesson is to listen, learn and adapt. (author)

  13. Lessons learned from the special inspection program for emergency operating procedures: Conducted March--October 1988

    International Nuclear Information System (INIS)

    1989-04-01

    The results of the team inspections conducted during 1988 for the Nuclear Regulatory Commission (NRC) Emergency Operating Procedures (EOPs) Inspection Program are summarized in this report. Inspection results are discussed in relation to past staff guidance provided to utilities for upgrade of EOPs. In this report the NRC presents information of particular interest to the nuclear power industry regarding concerns that were identified during the EOP team inspections and restates the staff's previous guidance in a format that more clearly illustrates the consequences of programmatic weaknesses. The information contained in this report is provided so that licensees may take advantage of the lessons learned from the EOP inspection effort. This report does not impose any new requirements related to the upgrading of EOPs. 7 refs

  14. Lessons learned

    International Nuclear Information System (INIS)

    Ziedelis, S.; Zerger, B.

    2012-01-01

    Operational experience feedback can be a valuable tool for preventing recurrence of similar events at nuclear plants. However, human and organizational factors can significantly hamper accident investigations. (authors)

  15. Applying lessons learned to enhance human performance and reduce human error for ISS operations

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, W.R.

    1998-09-01

    A major component of reliability, safety, and mission success for space missions is ensuring that the humans involved (flight crew, ground crew, mission control, etc.) perform their tasks and functions as required. This includes compliance with training and procedures during normal conditions, and successful compensation when malfunctions or unexpected conditions occur. A very significant issue that affects human performance in space flight is human error. Human errors can invalidate carefully designed equipment and procedures. If certain errors combine with equipment failures or design flaws, mission failure or loss of life can occur. The control of human error during operation of the International Space Station (ISS) will be critical to the overall success of the program. As experience from Mir operations has shown, human performance plays a vital role in the success or failure of long duration space missions. The Department of Energy`s Idaho National Engineering and Environmental Laboratory (INEEL) is developed a systematic approach to enhance human performance and reduce human errors for ISS operations. This approach is based on the systematic identification and evaluation of lessons learned from past space missions such as Mir to enhance the design and operation of ISS. This paper describes previous INEEL research on human error sponsored by NASA and how it can be applied to enhance human reliability for ISS.

  16. LESSONS LEARNED IN OPERATING THE HOSE-IN-HOSE SYSTEM FOR TRANSFSERRING SLUDGE AT HANFORD'S K BASINS

    International Nuclear Information System (INIS)

    PERES MW

    2008-01-01

    In May 2007, the Department of Energy and the Fluor Hanford K Basin Closure Project completed transferring sludge from the K East Basin to new containers in the K West Basin using a Hose-in-Hose system. This project presented a number of complex and unique technical, operational, and management challenges that had to be resolved to complete the required transfers and satisfy project milestones. The project team (including DOE; regulators; and Fluor management, operations, maintenance, engineering and all other support organizations) found innovative solutions to each challenge. This paper records lessons learned during the operational phase of the sludge transfer via the Hose-In-Hose system. The subject is limited to the operational phase and does not cover design, development, testing or turnover. A discussion of the situation or problem encountered is provided, along with the lesson learned as applicable to a future program or project

  17. Integrated radwaste treatment system lessons learned from 2 1/2 years of operation

    International Nuclear Information System (INIS)

    Baker, M.N.; Fussner, R.J.

    1997-05-01

    The Integrated Radwaste Treatment System (IRTS) at the West Valley Demonstration Project (WVDP) is a pretreatment scheme to reduce the amount of salts in the high-level radioactive waste (vitrification) stream. Following removal of cesium-137 (Cs-137) by ion-exchange in the Supernatant Treatment System (STS), the radioactive waste liquid is volume-reduced by evaporation. Trace amounts of Cs-137 in the resulting distillate are removed by ion-exchange, then the distillate is discharged to the existing plant water treatment system. The concentrated product, 37 to 41 percent solids by weight, is encapsulated in cement producing a stable, low-level waste form. The Integrated Radwaste Treatment System (IRTS) operated in this mode from May 1988 through November 1990, decontaminating 450,000 gallons of high-level waste liquid; evaporating and encapsulating the resulting concentrates into 10,393 71-gallon square drums. A number of process changes and variations from the original operating plan were required to increase the system flow rate and minimize waste volumes. This report provides a summary of work performed to operate the IRTS, including system descriptions, process highlights, and lessons learned

  18. Lessons Learned

    International Nuclear Information System (INIS)

    Dougan, A.D.; Blair, S.

    2006-01-01

    LLNL turned in 5 Declaration Line Items (DLI's) in 2006. Of these, one was declared completed. We made some changes to streamline our process from 2005, used less money, time and fewer team members. This report is a description of what changes we made in 2006 and what we learned. Many of our core review team had changed from last year, including our Laboratory Director, the Facility safety and security representatives, our Division Leader, and the OPSEC Committee Chair. We were able to hand out an AP Manual to some of them, and briefed all newcomers to the AP process. We first went to the OPSEC Committee and explained what the Additional Protocol process would be for 2006 and solicited their help in locating declarable projects. We utilized the 'three questions' from the AP meeting last year. LLNL has no single place to locate all projects at the laboratory. We talked to Resource Managers and key Managers in the Energy and Environment Directorate and in the Nonproliferation Homeland and International Security Directorate to find applicable projects. We also talked to the Principal Investigators who had projects last year. We reviewed a list of CRADA's and LDRD projects given to us by the Laboratory Site Office. Talking to the PI's proved difficult because of vacation or travel schedules. We were never able to locate one PI in town. Fortunately, collateral information allowed us to screen out his project. We had no problems in downloading new versions of the DWA and DDA. It was helpful for both Steve Blair and Arden Dougan to have write privileges. During the time we were working on the project, we had to tag-team the work to allow for travel and vacation schedules. We had some difficulty locating an 'activities block' in the software. This was mentioned as something we needed to fix from our 2005 declaration. Evidently the Activities Block has been removed from the current version of the software. We also had trouble finding the DLI Detail Report, which we included

  19. Lessons learned from the STS-120/ISS 10A robotics operations

    Science.gov (United States)

    Aziz, Sarmad

    2010-01-01

    analysis of the robotics operations executed during the STS-120 and 10A stage mission. The paper will highlight the unique challenges associated with the planning and execution of the P6 truss and Node 2 module relocation tasks, as well as the robotics issues faced during the planning and execution of the solar array repair space walk. The analysis will address the operational techniques and mission planning guideline used to deal with tight timelines, structural loads issues, ISS attitude control issues, and complex interdependencies between various ISS systems during the assembly and solar array repair operations. A discussion of the lessons learned from the planning and execution of these complex robotics tasks will also be presented.

  20. Operational Lessons Learned from the Ares I-X Flight Test

    Science.gov (United States)

    Davis, Stephan R.

    2010-01-01

    The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle

  1. Sloan Digital Sky Survey: Performance and Lessons Learned from the First Two Years of Operations

    Science.gov (United States)

    Boroski, William N.; Gunn, James E.; Kron, Richard G.; Peoples, John, Jr.

    2002-12-01

    Over a 5-year observing period, the Sloan Digital Sky Survey (SDSS) will acquire data to construct a digital 5-color photometric map of the Northern Galactic sky to about 23rd magnitude, and a correspondingly large and homogeneous spectroscopic survey. The SDSS is in a unique class of projects, in that all aspects of the SDSS infrastructure, from the telescopes and instruments, to software and operations staffing, were designed and assembled specifically to conduct this Survey. To ensure success, observing operations are run in production mode and performance metrics are used to measure progress over time. The methodology of preparing the performance baseline plan, and an assessment of Survey progress after two full years of operation, are reviewed and some lessons learned discussed. In particular, the SDSS has benefited greatly by asking peers in the field to participate in external reviews that periodically assess performance and offer independent, fresh views of potential areas of concerns. Additionally, difficulties caused by the absence of an experienced systems-engineering staff during the final phase of construction and commissioning are reviewed. The challenges of building a production machine out of complex and state-of-the-art sub-systems cannot be overstated. In the case of the SDSS, insufficient systems engineering led to problems meeting initial image quality requirements, primarily because of problems with the thermal performance of the telescope and its environment. A concerted campaign to deal with these issues was successful, but that success came rather later than we would have liked. The improvements made to address the situation, and the resulting increase in operational performance, are discussed.

  2. Emergency operating procedures improvement based on the lesson learned from the Fukushima Daiichi accident

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Wen-Hsiung, E-mail: whwu1127@aec.gov.tw [Atomic Energy Council, 2F., No. 80, Sec.1, Chenggong Rd., Yonghe Dist., New Taipei City 234, Taiwan (China); Institute of Nuclear Engineering and Science, National Tsing Hua University, No. 101, Sec. 2, Guangfu Rd., Hsinchu City 300, Taiwan (China); Liao, Lih-Yih, E-mail: lyliao@iner.gov.tw [Institute of Nuclear Energy Research, Atomic Energy Council, No. 1000, Wenhua Rd., Jiaan Village, Longtan Township, Taoyuan County 325, Taiwan (China)

    2016-12-01

    Highlights: • Discuss the problem of EOPs at the time of Fukushima accident to deal with the prolonged SBO. • Elaborate the potential risk accompanied with the emergency depressurization in the SBO. • Describe a special guideline to cope with Fukushima-like accidents and provide its technical basis. • Point out that Fukushima accident might have been prevented if improved EOPs had been used. • Propose key points and suggestions for improving the EOPs. - Abstract: One of the lessons learned from the Fukushima Daiichi accident is the emergency operating procedures (EOPs) have to be improved. The BWR Owners’ Group revised the emergency procedure guidelines and addressed the lesson learned from the Fukushima Daiichi accident in revision 3 in order to avoid loss of turbine-driven makeup water systems during reactor depressurization. However, the improvement deserves much more attention. The existing EOPs at the time of the accident may not be adequate enough for the prolonged station blackout condition, because resources required for performing the EOPs are vastly unavailable or gradually exhausted. The improved EOPs must not only permit early reactor pressure vessel depressurization, but also address the risk accompanied with the emergency depressurization. For this reason, Taiwan Power Company proposed the Ultimate Response Guideline (URG) to cope with Fukushima-like accidents. The main content of the URG is a two-stage depressurization strategy, namely the controlled depressurization and the emergency depressurization. The technical basis of the two-stage depressurization strategy was discussed in this paper. The effectiveness of the URG was verified by using TRAC/RELAP Advanced Computational Engine (TRACE). Besides, the emergency responses performed by Fukushima Daini nuclear power plant (Fukushima Daini NPP) were found to be very similar to the URG. The consequences of Fukushima Daini NPP somehow demonstrate that the URG is effective for Fukushima

  3. Emergency operating procedures improvement based on the lesson learned from the Fukushima Daiichi accident

    International Nuclear Information System (INIS)

    Wu, Wen-Hsiung; Liao, Lih-Yih

    2016-01-01

    Highlights: • Discuss the problem of EOPs at the time of Fukushima accident to deal with the prolonged SBO. • Elaborate the potential risk accompanied with the emergency depressurization in the SBO. • Describe a special guideline to cope with Fukushima-like accidents and provide its technical basis. • Point out that Fukushima accident might have been prevented if improved EOPs had been used. • Propose key points and suggestions for improving the EOPs. - Abstract: One of the lessons learned from the Fukushima Daiichi accident is the emergency operating procedures (EOPs) have to be improved. The BWR Owners’ Group revised the emergency procedure guidelines and addressed the lesson learned from the Fukushima Daiichi accident in revision 3 in order to avoid loss of turbine-driven makeup water systems during reactor depressurization. However, the improvement deserves much more attention. The existing EOPs at the time of the accident may not be adequate enough for the prolonged station blackout condition, because resources required for performing the EOPs are vastly unavailable or gradually exhausted. The improved EOPs must not only permit early reactor pressure vessel depressurization, but also address the risk accompanied with the emergency depressurization. For this reason, Taiwan Power Company proposed the Ultimate Response Guideline (URG) to cope with Fukushima-like accidents. The main content of the URG is a two-stage depressurization strategy, namely the controlled depressurization and the emergency depressurization. The technical basis of the two-stage depressurization strategy was discussed in this paper. The effectiveness of the URG was verified by using TRAC/RELAP Advanced Computational Engine (TRACE). Besides, the emergency responses performed by Fukushima Daini nuclear power plant (Fukushima Daini NPP) were found to be very similar to the URG. The consequences of Fukushima Daini NPP somehow demonstrate that the URG is effective for Fukushima

  4. The Component Operational Experience Degradation and Ageing Program (CODAP). Review and lessons learned (2011-2014)

    International Nuclear Information System (INIS)

    Dragea, Tudor; Riznic, Jovica R.

    2015-01-01

    The structural integrity of piping systems is crucial to continuous and safe operation of nuclear power plants. Across all designs, the pressure boundary and its related piping and components, form one of the many levels of defense in the continuous and safe operation of a nuclear power plant. It is therefore necessary to identify, understand, evaluate and catalogue all of the various degradation mechanisms and failures that affect various piping systems and components across all nuclear power plants (NPP's). This need was first recognized in 1994 by the Swedish Nuclear Power Inspectorate (SKI) which launched a five-year Research and Development (R and D) project to explore the viability of creating an international pipe failure database (SKI-PIPE) (Riznic, 2007). The project was considered to be very successful and in 2002, the Organization for Economic Co-operation and Development (OECD) Pipe Failure Data Exchange (OPDE) was created. OPDE was operated under the umbrella of the OECD Nuclear Energy Agency (NEA) and was created in order to produce an international database on the piping service experience applicable to commercial nuclear power plants. After the successful completion of OPDE, the OECD, as well as other international members, agreed to participate in OPDE's successor: the Component Operational Experience Degradation and Ageing Program (CODAP). The objective of CODAP is to collect information on all possible events related to the failure and degradation of passive metallic components in NPP's. With CODAP winding down to the completion of its first phase in December 2014, this report will focus on the conclusions and the lessons learned throughout the many years of CODAP's implementation. There are currently 14 countries participating in CODAP, many of whom are industry leaders (France, Canada, U.S.A., Germany, Japan, Korea etc.). This cooperation on an international scale provides a library of OPerational EXperience (OPEX) for all participating NPP

  5. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    International Nuclear Information System (INIS)

    Filbert, Wolfgang; Herold, Philipp

    2015-01-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  6. A qualitative content analysis of global health engagements in Peacekeeping and Stability Operations Institute's stability operations lessons learned and information management system.

    Science.gov (United States)

    Nang, Roberto N; Monahan, Felicia; Diehl, Glendon B; French, Daniel

    2015-04-01

    Many institutions collect reports in databases to make important lessons-learned available to their members. The Uniformed Services University of the Health Sciences collaborated with the Peacekeeping and Stability Operations Institute to conduct a descriptive and qualitative analysis of global health engagements (GHEs) contained in the Stability Operations Lessons Learned and Information Management System (SOLLIMS). This study used a summative qualitative content analysis approach involving six steps: (1) a comprehensive search; (2) two-stage reading and screening process to identify first-hand, health-related records; (3) qualitative and quantitative data analysis using MAXQDA, a software program; (4) a word cloud to illustrate word frequencies and interrelationships; (5) coding of individual themes and validation of the coding scheme; and (6) identification of relationships in the data and overarching lessons-learned. The individual codes with the most number of text segments coded included: planning, personnel, interorganizational coordination, communication/information sharing, and resources/supplies. When compared to the Department of Defense's (DoD's) evolving GHE principles and capabilities, the SOLLIMS coding scheme appeared to align well with the list of GHE capabilities developed by the Department of Defense Global Health Working Group. The results of this study will inform practitioners of global health and encourage additional qualitative analysis of other lessons-learned databases. Reprint & Copyright © 2015 Association of Military Surgeons of the U.S.

  7. Constellation Program Lessons Learned. Volume 2; Detailed Lessons Learned

    Science.gov (United States)

    Rhatigan, Jennifer; Neubek, Deborah J.; Thomas, L. Dale

    2011-01-01

    These lessons learned are part of a suite of hardware, software, test results, designs, knowledge base, and documentation that comprises the legacy of the Constellation Program. The context, summary information, and lessons learned are presented in a factual format, as known and described at the time. While our opinions might be discernable in the context, we have avoided all but factually sustainable statements. Statements should not be viewed as being either positive or negative; their value lies in what we did and what we learned that is worthy of passing on. The lessons include both "dos" and "don ts." In many cases, one person s "do" can be viewed as another person s "don t"; therefore, we have attempted to capture both perspectives when applicable and useful. While Volume I summarizes the views of those who managed the program, this Volume II encompasses the views at the working level, describing how the program challenges manifested in day-to-day activities. Here we see themes that were perhaps hinted at, but not completely addressed, in Volume I: unintended consequences of policies that worked well at higher levels but lacked proper implementation at the working level; long-term effects of the "generation gap" in human space flight development, the need to demonstrate early successes at the expense of thorough planning, and the consequences of problems and challenges not yet addressed because other problems and challenges were more immediate or manifest. Not all lessons learned have the benefit of being operationally vetted, since the program was cancelled shortly after Preliminary Design Review. We avoid making statements about operational consequences (with the exception of testing and test flights that did occur), but we do attempt to provide insight into how operational thinking influenced design and testing. The lessons have been formatted with a description, along with supporting information, a succinct statement of the lesson learned, and

  8. Lessons learned from an installation perspective for chemical demilitarization plant start-up at four operating incineration sites.

    Energy Technology Data Exchange (ETDEWEB)

    Motz, L.; Decision and Information Sciences

    2011-02-21

    This study presents the lessons learned by chemical storage installations as they prepared for the start of chemical demilitarization plant operations at the four current chemical incinerator sites in Alabama, Arkansas, Oregon, and Utah. The study included interviews with persons associated with the process and collection of available documents prepared at each site. The goal was to provide useful information for the chemical weapons storage sites in Colorado and Kentucky that will be going through plant start-up in the next few years. The study is not a compendium of what to do and what not to do. The information has been categorized into ten lessons learned; each is discussed individually. Documents that may be useful to the Colorado and Kentucky sites are included in the appendices. This study should be used as a basis for planning and training.

  9. Field observations and lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Joh B [Los Alamos National Laboratory

    2010-01-01

    This presentation outlines observations and lessons learned from the Megaports program. It provides: (1) details of field and technical observations collected during LANL field activities at ports around the world and details of observations collected during radiation detections system testing at Los Alamos National Laboratory; (2) provides suggestions for improvement and efficiency; and (3) discusses possible program execution changes for more effective operations.

  10. Constellation Lessons Learned Executive Summary

    Science.gov (United States)

    Thomas, L. Dale; Neubek, Deb

    2011-01-01

    This slide presentation reviews the lessons learned from the Constellation Program (CxP) and identified several factors that contributed to the inability of the CxP to meet the cost and schedule commitments. The review includes a significant section on the context in which the CxP operated since new programs are likely to experience the same constraints.

  11. Results on Technical and Consultants Service Meetings on Lessons Learned from Operating Experience in Wet and Dry Spent Fuel Storage

    International Nuclear Information System (INIS)

    White, B.; Zou, X.

    2015-01-01

    Spent fuel storage has been and will continue to be a vital portion of the nuclear fuel cycle, regardless of whether a member state has an open or closed nuclear fuel cycle. After removal from the reactor core, spent fuel cools in the spent fuel pool, prior to placement in dry storage or offsite transport for disposal or reprocessing. Additionally, the inventory of spent fuel at many reactors worldwide has or will reach the storage capacity of the spent fuel pool; some facilities are alleviating their need for additional storage capacity by utilizing dry cask storage. While there are numerous differences between wet and dry storage; when done properly both are safe and secure. The nuclear community shares lessons learned worldwide to gain knowledge from one another’s good practices as well as events. Sharing these experiences should minimize the number of incidents worldwide and increase public confidence in the nuclear industry. Over the past 60 years, there have been numerous experiences storing spent fuel, in both wet and dry mediums, that when shared effectively would improve operations and minimize events. These lessons learned will also serve to inform countries, who are new entrants into the nuclear power community, on designs and operations to avoid and include as best practices. The International Atomic Energy Agency convened a technical and several consultants’ meetings to gather these experiences and produce a technical document (TECDOC) to share spent fuel storage lessons learned among member states. This paper will discuss the status of the TECDOC and briefly discuss some lessons learned contained therein. (author)

  12. Human Spaceflight Conjunction Assessment: Lessons Learned

    Science.gov (United States)

    Smith, Jason T.

    2011-01-01

    This viewgraph presentation reviews the process of a human space flight conjunction assessment and lessons learned from the more than twelve years of International Space Station (ISS) operations. Also, the application of these lessons learned to a recent ISS conjunction assessment with object 84180 on July 16, 2009 is also presented.

  13. Lessons Learned from Sandia National Laboratories' Operational Readiness Review of the Annular Core Research Reactor (ACRR)

    Energy Technology Data Exchange (ETDEWEB)

    Bendure, Albert O.; Bryson, James W.

    1999-05-17

    The Sandia ACRR (a Hazard Category 2 Nuclear Reactor Facility) was defueled in June 1997 to modify the reactor core and control system to produce medical radioisotopes for the Department of Energy (DOE) Isotope Production Program. The DOE determined that an Operational Readiness Review (ORR) was required to confirm readiness to begin operations within the revised safety basis. This paper addresses the ORR Process, lessons learned from the Sandia and DOE ORRS of the ACRR, and the use of the ORR to confirm authorization basis implementation.

  14. Learning lessons from accidents with a human and organisational factors perspective: deficiencies and failures of operating experience feedback systems

    International Nuclear Information System (INIS)

    Dechy, N.; Rousseau, J.M.; Jeffroy, F.

    2012-01-01

    This paper aims at reminding the failures of operating experience feedback (OEF) systems through the lessons of accidents and provides a framework for improving the efficiency of OEF processes. The risk is for example to miss lessons from other companies and industrial sectors, or to miss the implementation of adequate corrective actions with the risk to repeat accidents. Most of major accidents have been caused by a learning failure or other organisational factors as a contributing cause among several root causes. Some of the recurring organisational factors are: -) poor recognition of critical components, of critical activities or deficiency in anticipation and detection of errors, -) excessive production pressure, -) deficiency of communication or lack of quality of dialogue, -) Excessive formalism, -) organisational complexity, -) learning deficiencies (OEF, closing feedback loops, lack of listening of whistle-blowers). Some major accidents occurred in the nuclear industry. Although the Three Mile Island accident has multiple causes, in particular, an inappropriate design of the man-machine interface, it is a striking example of the loss of external lessons from incidents. As for Fukushima it is too early to have established evidence on learning failures. The systematic study and organisational analysis of OEF failures in industrial accidents whatever their sector has enabled us to provide a framework for OEF improvements. Five key OEF issues to improve in priority: 1) human and organisational factors analysis of the root causes of the events, 2) listening to the field staff, dissenting voices and whistle-blowers, 3) monitoring of the external events that provide generic lessons, 4) building an alive memory through a culture of accidents with people who become experiences pillars, and 5) the setting of external audit or organisational analysis of the OEF system by independent experts. The paper is followed by the slides of the presentation

  15. CP-5 reactor remote dismantlement activities: Lessons learned in the integration of new technology in an operations environment

    International Nuclear Information System (INIS)

    Noakes, M.W.

    1998-01-01

    This paper presents the developer's perspective on lessons learned from one example of the integration of new prototype technology into a traditional operations environment. The dual arm work module was developed by the Robotics Technology Development Program as a research and development activity to examine manipulator controller modes and deployment options. It was later reconfigured for the dismantlement of the Argonne National Laboratory Chicago Pile No. 5 reactor vessel as the crane-deployed dual arm work platform. Development staff worked along side operations staff during a significant part of the deployment to provide training, maintenance, and tooling support. Operations staff completed all actual remote dismantlement tasks. At the end of available development support funding, the Dual Arm Work Platform was turned over to the operations staff, who are still using it to complete their dismantlement tasks

  16. DSCOVR Contamination Lessons Learned

    Science.gov (United States)

    Graziani, Larissa

    2015-01-01

    The Triana observatory was built at NASA GSFC in the late 1990's, then placed into storage. After approximately ten years it was removed from storage and repurposed as the Deep Space Climate Observatory (DSCOVR). This presentation outlines the contamination control program lessons learned during the integration, test and launch of DSCOVR.

  17. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  18. Field experience with the application and operation of permanent magnet motors in the ESP Industry: success stories and lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Sagalovskiy, A.; Gorshenin, K. [Borets Company, Moscow (Russian Federation)

    2012-07-01

    Over the past 7 years Borets Company has commercialized a permanent magnet motor (PMM) with a specialized controller that is capable of replacing the traditional motor used in ESP systems. Since 2006 more than 1400 Borets Company PMM systems have been installed by oil companies. This paper will provide an overview of the application environment covered by these installations and contrast the performance for the PMM system versus the traditional 2- pole, 3-phase ESP systems that were replaced. Results will include the lessons learned, best practices developed, and benefits realized by the operator. The PMM practice will be of value to new operators as this technology is introduced to other regions of the globe as well as the expansion of this technology into the ESPCP-PMM market. (author)

  19. Development of a Remotely-operated Visual Inspection System for Reactor Vessel Bottommounted Instrument Penetrations of KSNP and Lessons Learned

    International Nuclear Information System (INIS)

    Jeong, Kyungmin; Choi, Youngsu; Lee, Sunguk; Seo, Yongchil; Kang, Jong Gyu; Kim, Seungho; Jung, Seungho

    2006-01-01

    In April 2003, South Texas Project Unit 1 made a surprising discovery of boron acid leakage from two nozzles from a bare-metal examination of the reactor vessel bottom-mounted instrument penetrations during a routine refueling outage. A small powdery substance about 150mg was found on the outside of two instrument guide penetration nozzles on the bottom of the reactor. The primary coolant water of pressurized water reactors has caused cracking in penetrations with Alloy 600 through a process called primary water stress corrosion cracking. In South Korea, it is required to conduct 100% visual inspection of the outside of instrument guide penetration nozzles on the bottom of PWRs to confirm the integrity of reactor vessel. This paper describes the remotely-operated visual inspection systems for reactor vessel bottom-mounted instrument penetrations dispatched two times to Youngkwang NPPs and discusses the lessons learned

  20. Operation of TRR-1/M1 for 25 years and lessons learned in management of safety and safety culture

    International Nuclear Information System (INIS)

    Keinmeesuke, Sirichai

    2002-01-01

    The first Thai Research Reactor, TRR-1, was installed and put into operation in 1962. In 1975 the reactor was converted to a 2 MW TRIGA Mark III by replacing of the reactor core and the control system. The renamed TRR-1/M1 research reactor went critical again in November 1977. TRR-1/M1 has been operated safely for 25 years with its main utilization in research, isotope production and training. Safety management and safety culture have been implemented for 25 years both in the legislation level and the operation level. There was no nuclear incident and there were a few radiological incidents during the 25 years of operation of TRR-1/M1. The lessons learned from the incident events such as the release of N-16 and Ar-41, the release of radioactive Bromine gave valued opportunities to improve our operation procedure, safety procedure and safety culture. All type of activities with respect to safety culture such as individual awareness, commitment, motivation, supervision and responsibility have been seriously reviewed and being set as normal practices. (author)

  1. Operation Iraqi Freedom: DOD Should Apply Lessons Learned Concerning the Need for Security over Conventional Munitions Storage Sites to Future Operations Planning

    National Research Council Canada - National Science Library

    D'Agostino, Davi M

    2007-01-01

    The Government Accountability Office (GAO) is releasing a report today on lessons learned concerning the need for security over conventional munitions storage sites that provides the basis for this testimony...

  2. Lessons learned from the operation of a LILW National disposal centre: The Cabril and the Spanish case - 16029

    International Nuclear Information System (INIS)

    Navarro, Mariano; Gomez, Fernando; Garcia, Emilio

    2009-01-01

    Spain occupies a relatively important position in experience in the field of LILW management. The management of LILW in Spain may be defined as an integrated system encompassing the entire spectrum; from production controls, removal and transport, to disposal. In this system, a clear definition of the responsibilities of each of the people involved plays a fundamental role. ENRESA, the organization in charge of radioactive waste management in Spain, has been operating the El Cabril LILW disposal facility since 1992, this installation being a key component in the national LILW management programme. Over the years ENRESA has acquired significant operating experience from a multi-disciplinary point of view, including technical, economic and social aspects. To date, since the design phase of the facility and over more than fifteen years, ENRESA has adopted a series of decisions and has undertaken programmes and activities that have allowed the installation to evolve into the reality that it now is. The aim of this paper is to present the lessons learned from a strategic point of view and in relation to the most relevant and significant aspects that have facilitated the normal operation of the facility, and the development of specific solutions to the challenges posed by the performance of activities, and the emerging needs of the Spanish programme. (authors)

  3. A Summary of the Rendezvous, Proximity Operations, Docking, and Undocking (RPODU) Lessons Learned from the Defense Advanced Research Project Agency (DARPA) Orbital Express (OE) Demonstration System Mission

    Science.gov (United States)

    Dennehy, Cornelius J.; Carpenter, James R.

    2011-01-01

    The Guidance, Navigation, and Control (GN&C) Technical Discipline Team (TDT) sponsored Dr. J. Russell Carpenter, a Navigation and Rendezvous Subject Matter Expert (SME) from NASA's Goddard Space Flight Center (GSFC), to provide support to the Defense Advanced Research Project Agency (DARPA) Orbital Express (OE) rendezvous and docking flight test that was conducted in 2007. When that DARPA OE mission was completed, Mr. Neil Dennehy, NASA Technical Fellow for GN&C, requested Dr. Carpenter document his findings (lessons learned) and recommendations for future rendezvous missions resulting from his OE support experience. This report captures lessons specifically from anomalies that occurred during one of OE's unmated operations.

  4. St. Louis FUSRAP Lessons Learned

    International Nuclear Information System (INIS)

    Eberlin, J.; Williams, D.; Mueller, D.

    2003-01-01

    The purpose of this paper is to present lessons learned from fours years' experience conducting Remedial Investigation and Remedial Action activities at the St. Louis Downtown Site (SLDS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Many FUSRAP sites are experiencing challenges conducting Remedial Actions within forecasted volume and budget estimates. The St. Louis FUSRAP lessons learned provide insight to options for cost effective remediation at FUSRAP sites. The lessons learned are focused on project planning (budget and schedule), investigation, design, and construction

  5. Lessons learned in radiology

    International Nuclear Information System (INIS)

    Goodenough, D.J.

    2001-01-01

    The paper reviews aspects of the history of radiology with the goal of identifying lessons learned, particularly in the area of radiological protection of the patient in diagnostic and interventional radiology, nuclear medicine and radiotherapy. It is pointed out that since the days of Roentgen there has been a need not only to control and quantify the amount of radiation reaching the patient but also to optimize the imaging process to offer the greatest diagnostic benefit within allowable levels of patient dose. To this end, in diagnostic radiology, one finds the development of better films, X rays tubes, grids, screens and processing techniques, while in fluoroscopy, one sees the increased luminance of calcium tungstate. In interventional radiology, one finds an improvement in catheterization techniques and contrast agents. In nuclear medicine, the development of tracer techniques into modern cameras and isotopes such as technetium can be followed. In radiotherapy, one sees the early superficial X rays and radium sources gradually replaced with radon seeds, supervoltage, 60 Co and today's linear accelerators. Along with the incredible advances in imaging and therapeutic technologies comes the growing realization of the potential danger of radiation and the need to protect the patient (as well as physicians, ancillary personnel and the general population) from unnecessary radiation. The important lesson learned is that we must walk a tightrope, balancing the benefits and risks of any technology utilizing radiation to produce the greatest benefits at the lowest acceptable risk. The alternative techniques using non-ionizing radiation will have to be considered as part of the general armamentarium for medical imaging whenever radiation consequences are unacceptable. (author)

  6. Lessons Learned from FUSRAP

    Energy Technology Data Exchange (ETDEWEB)

    Castillo, Darina [U.S. Department of Energy, Office of Legacy Management; Carpenter, Cliff [U.S. Department of Energy, Office of Legacy Management; Miller, Michele [Navarro Research and Engineering

    2016-03-06

    The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970s, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM’s inventory of sites for long-term surveillance and maintenance (LTS&M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for “unrestricted” industrial use or remediated to the “cleanup standards” at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE’s LTS&M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS&M requirements for the sites, and (3) greater involvement in the transition process.

  7. Higher Education ERP: Lessons Learned.

    Science.gov (United States)

    Swartz, Dave; Orgill, Ken

    2001-01-01

    Shares experiences and lessons learned by chief information officers of large universities about enterprise resource planning (ERP). Specifically, provides a framework for approaching an ERP that could save universities millions of dollars. (EV)

  8. Lessons learned from accidents investigations

    Energy Technology Data Exchange (ETDEWEB)

    Zuniga-Bello, P. [Consejo Nacional de Ciencia y Tecnologia (CONACYT), Mexico City (Mexico); Croft, J. [National Radiological Protection Board (United Kingdom); Glenn, J

    1997-12-31

    Accidents from three main practices: medical applications, industrial radiography and industrial irradiators are used to illustrate some common causes of accidents and the main lessons to be learned. A brief description of some of these accidents is given. Lessons learned from the described accidents are approached by subjects covering: safety culture, quality assurance, human factors, good engineering practice, defence in depth, security of sources, safety assessment and monitoring and verification compliance. (author)

  9. Lessons learned from accident investigations

    International Nuclear Information System (INIS)

    Zuniga-Bello, P.; Croft, J.R.; Glenn, J.

    1998-01-01

    Accidents in three main practices - medical applications, industrial radiography and industrial irradiators - are used to illustrate some common causes of accidents and the main lessons to be learned from them. A brief description of some of these accidents is given. Lessons learned from the accidents described are approached bearing in mind: safety culture, quality assurance, human factors, good engineering practice, defence in depth, security of sources, safety assessment and monitoring and verification compliance. (author)

  10. Lessons Learned from ISS Cooperation

    Science.gov (United States)

    Jolly, C.

    2002-01-01

    Forty years of human spaceflight activities are now culminating in the International Space Station program (ISS). The ISS involves fifteen nations, working together to create a permanently occupied orbital facility that will support scientific and potentially, commercial endeavours. The assembly of the ISS is scheduled to be completed later in this decade, after which it will be operated for at least ten years. At the strategic level, such a complex international project is highly dependent on the fifteen Partners' respective internal politics and foreign policies. On the operational level, Partners still have certain difficulties in issuing and agreeing to common technical procedures. As with almost all aspects of International Space Station cooperation, the Partners are going through a constant learning process, where they have to deal with complex political, legal and operational differences. Intergovernmental Agreement and the Memoranda of Understanding, the instruments forming the legal backbone of the International Space Station cooperation, are still lacking a fair number of arrangements that need to be created for completing and operating the Station. The whole endeavour is also a constant learning process at the operational level, as astronauts, cosmonauts, engineers and technicians on the ground with different cultural and educational backgrounds, learn to work together. One recent Space Shuttle mission to the Station showed the importance of standardising even trivial system components such as packaging labels, as it took the astronauts half a day more than planned to correctly unpack the equipment. This paper will provide a synthesis of some of the main lessons learned during the first few years of International Space Station's lifetime. Important political, legal and operational issues will be addressed and combined. This analysis will provide some guidelines and recommendations for future international space projects, such as an international human

  11. Developing an effective corrective action process : lessons learned from operating a confidential close call reporting system

    Science.gov (United States)

    2013-03-05

    In 2007, the Federal Railroad Administration (FRA) launched : C3RS, the Confidential Close Call Reporting System, as a : demonstration project to learn how to facilitate the effective : reporting and implementation of corrective actions, and assess t...

  12. Lessons Learned From a Decade of Design, Construction, and Operations of the Environmental Management Waste Management Facility in Oak Ridge, Tennessee - 12062

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Joe [Bechtel National, Inc., Oak Ridge, TN 37830 (United States)

    2012-07-01

    The Environmental Management Waste Management Facility (EMWMF) is the Department of Energy's on-site disposal facility for radioactive and hazardous waste generated by the CERCLA cleanup of the Oak Ridge Reservation (ORR). EMWMF recently completed building out to its maximum site capacity and is approaching a decade of operating experience. In meeting the challenges of design, construction, and operation of a mixed waste and low-level radioactive waste disposal facility within the framework of CERCLA, the Bechtel Jacobs Company LLC (BJC) project team learned valuable lessons that may be beneficial to other disposal facilities. Since project inception in 1998, the scope of the effort includes five regulator-approved designs, four phases of construction, and utilization of half of EMWMF's 1.63 M m{sup 3} of airspace during disposal of waste streams from across the ORR. Funding came from the broadest possible range of sources - privatization, American Recovery and Reinvestment Act, and two funding appropriation accounts. In the process of becoming the cost effective disposal outlet for the majority of the ORR cleanup waste, EMWMF overcame numerous challenges. Lessons learned were a key factor in achieving that success. Many of EMWMF's challenges are common to other disposal facilities. Sharing the successes and lessons learned will help other facilities optimize design, construction, and operations. (author)

  13. Operations Strategy under Chaos –Lessons to be learned from a new Paradigm

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    The purpose of this paper is to introduce a new paradigm being able to conceptualize content and process aspects of Operations Strategy. Based on a critical reading of literature; two opposing paradigms of Operations Strategy are identified and described. The first focuses on content issues...... of Operations Strategy and relies on a normative orientation and the second focuses on process issues of Operations Strategy and relies on a descriptive orientation. To compare and evaluate the two paradigms; the results of a longitudinal case-study of Operations Strategy formulation and implementation...... in practice are shown. These results promote the need for a new or third paradigm to integrate and balance the two former paradigms. The new paradigm is labeled as a moderate constructivist paradigm using the metaphor of chaos and seems suitable for conceptualizing Operations Strategy as it is in practice...

  14. Lessons learned from early criticality accidents

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1996-01-01

    Four accidents involving the approach to criticality occurred during the period July, 1945, through May, 1996. These have been described in the format of the OPERATING EXPERIENCE WEEKLY SUMMARY which is distributed by the Office of Nuclear and Facility Safety. Although the lessons learned have been incorporated in standards, codes, and formal procedures during the last fifty years, this is their first presentation in this format. It is particularly appropriate that they be presented in the forum of the Nuclear Criticality Technology Safety Project Workshop closest to the fiftieth anniversary of the last of the four accidents, and that which was most instrumental in demonstrating the need to incorporate lessons learned

  15. Patient safety: lessons learned

    International Nuclear Information System (INIS)

    Bagian, James P.

    2006-01-01

    The traditional approach to patient safety in health care has ranged from reticence to outward denial of serious flaws. This undermines the otherwise remarkable advances in technology and information that have characterized the specialty of medical practice. In addition, lessons learned in industries outside health care, such as in aviation, provide opportunities for improvements that successfully reduce mishaps and errors while maintaining a standard of excellence. This is precisely the call in medicine prompted by the 1999 Institute of Medicine report ''To Err Is Human: Building a Safer Health System.'' However, to effect these changes, key components of a successful safety system must include: (1) communication, (2) a shift from a posture of reliance on human infallibility (hence ''shame and blame'') to checklists that recognize the contribution of the system and account for human limitations, and (3) a cultivation of non-punitive open and/or de-identified/anonymous reporting of safety concerns, including close calls, in addition to adverse events. (orig.)

  16. WE-A-BRC-02: Lessons Learned: Clinical Trials and Operations

    International Nuclear Information System (INIS)

    Evans, S.

    2016-01-01

    Quality and safety in healthcare are inextricably linked. There are compelling data that link poor quality radiation therapy to inferior patient survival. Radiation Oncology clinical trial protocol deviations often involve incorrect target volume delineation or dosing, akin to radiotherapy incidents which also often involve partial geometric miss or improper radiation dosing. When patients with radiation protocol variations are compared to those without significant protocol variations, clinical outcome is negatively impacted. Traditionally, quality assurance in radiation oncology has been driven largely by new technological advances, and safety improvement has been driven by reactive responses to past system failures and prescriptive mandates recommended by professional organizations and promulgated by regulators. Prescriptive approaches to quality and safety alone often do not address the huge variety of process and technique used in radiation oncology. Risk-based assessments of radiotherapy processes provide a mechanism to enhance quality and safety, both for new and for established techniques. It is imperative that we explore such a paradigm shift at this time, when expectations from patients as well as providers are rising while available resources are falling. There is much we can learn from our past experiences to be applied towards the new risk-based assessments. Learning Objectives: Understand the impact of clinical and technical quality on outcomes Understand the importance of quality care in radiation oncology Learn to assess the impact of quality on clinical outcomes D. Followill, NIH Grant CA180803

  17. Winning the Peace: Building a Strategic Level Lessons Learned Program

    National Research Council Canada - National Science Library

    French, Daniel L

    2007-01-01

    The U.S. military has developed a robust, comprehensive system to capture, analyze, and disseminate tactical-level and operational-level lessons learned from training events and ongoing conflict operations...

  18. Lessons learned from external hazards

    Energy Technology Data Exchange (ETDEWEB)

    Peinador, Miguel; Zerger, Benoit [European Commisison Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Ramos, Manuel Martin [European Commission Joint Research Centre, Brussels (Belgium). Nuclear Safety and Security Coordination; Wattrelos, Didier [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Maqua, Michael [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, Koeln (Germany)

    2014-01-15

    This paper presents a study performed by the European Clearinghouse of the Joint Research Centre on Operational Experience for nuclear power plants in cooperation with IRSN and GRS covering events reported by nuclear power plants in relation to external hazards. It summarizes the review of 235 event reports from 3 different databases. The events were grouped in 9 categories according to the nature of the external hazard involved, and the specific lessons learned and recommendations that can be derived from each of these categories are presented. Additional 'cross-cutting' recommendations covering several or all the external hazards considered are also discussed. These recommendations can be useful in preventing this type of events from happening again or in limiting their consequences. The study was launched in 2010 and therefore it does not cover the Fukushima event. This paper presents the main findings and recommendations raised by this study. (orig.)

  19. Ageing degradation mechanisms in nuclear power plants: lessons learned from operating experience

    International Nuclear Information System (INIS)

    Bieth, M.; Zerger, B.; Duchac, A.

    2014-01-01

    This paper presents main results of a comprehensive study performed by the European Clearinghouse on Operating Experience Feedback of Nuclear Power Plants (NPP) with the support of IRSN (Institut de Surete Nucleaire et de Radioprotection) and GRS (Gesellschaft fuer Anlagen und Reaktorsicherheit mbH). Physical ageing mechanisms of Structures, Systems and Components (SSC) that eventually lead to ageing related systems and components failures at nuclear power plants were the main focus of this study. The analysis of ageing related events involved operating experience reported by NPP operators in France, Germany, USA and to the IAEA/NEA International Reporting System on operating experience for the past 20 years. A list of relevant ageing related events was populated. Each ageing related event contained in the list was analyzed and results of analysis were summarized for each ageing degradation mechanism which appeared to be the dominant contributor or direct cause. This paper provides insights into ageing related operating experience as well as recommendations to deal with the physical ageing of nuclear power plant SSC important to safety. (authors)

  20. Safety aspects in decontamination operations: Lessons learned during the decommissioning of a small PWR reactor

    International Nuclear Information System (INIS)

    Klein, M.; Ponnet, M.; Emond, O.

    2002-01-01

    Decontamination operations are generally executed during the decommissioning of nuclear installations for different objectives: decontamination of loops or large pieces to reduce the dose rate inside a contaminated plant or decontamination to minimize the amount of radioactive waste. These decontamination operations raise safety issues such as radiological exposure, classical safety, environmental releases, production and management of secondary waste, management of primary resources, etc. This paper presents the return of experience from decontamination operations performed during the dismantling of the BR3 PWR reactor. The safety issues are discussed for 3 types of decontamination operations: full system decontamination of the primary loop with a chemical process to reduce the dose rate by a factor of 10; thorough decontamination with an aggressive chemical process of dismantled pieces to reach the unconditional clearance values; and thorough decontamination processes with physical processes of metals and of concrete to reach the unconditional clearance values. For the protection of the workers, we must consider the ALARA aspects and the classical safety issues. During the progress of our dismantling operations, the dose rate issue was becoming less important but the classical safety issues were becoming preponderant due to the use of very aggressive techniques. For the protection of the environment, we must take all the precautions to avoid any leakages from the plant and we must use processes which minimize the use of toxic products and which minimize the production of secondary wastes. We therefore promote the use of regenerative processes. (author)

  1. The application of heliospheric imaging to space weather operations: Lessons learned from published studies

    Science.gov (United States)

    Harrison, Richard A.; Davies, Jackie A.; Biesecker, Doug; Gibbs, Mark

    2017-08-01

    The field of heliospheric imaging has matured significantly over the last 10 years—corresponding, in particular, to the launch of NASA's STEREO mission and the successful operation of the heliospheric imager (HI) instruments thereon. In parallel, this decade has borne witness to a marked increase in concern over the potentially damaging effects of space weather on space and ground-based technological assets, and the corresponding potential threat to human health, such that it is now under serious consideration at governmental level in many countries worldwide. Hence, in a political climate that recognizes the pressing need for enhanced operational space weather monitoring capabilities most appropriately stationed, it is widely accepted, at the Lagrangian L1 and L5 points, it is timely to assess the value of heliospheric imaging observations in the context of space weather operations. To this end, we review a cross section of the scientific analyses that have exploited heliospheric imagery—particularly from STEREO/HI—and discuss their relevance to operational predictions of, in particular, coronal mass ejection (CME) arrival at Earth and elsewhere. We believe that the potential benefit of heliospheric images to the provision of accurate CME arrival predictions on an operational basis, although as yet not fully realized, is significant and we assert that heliospheric imagery is central to any credible space weather mission, particularly one located at a vantage point off the Sun-Earth line.

  2. Air Force Support of Army Ground Operations Lessons Learned during World War II, Korea, and Vietnam

    Science.gov (United States)

    1989-03-06

    Th ;e 8epre--cdin this paper .rv thoe. of ’:ceauhor IDep 2rtmt-nt of Diefense rayo t gr: s hsPcC % FOC, O P 0- C GOUND OP!-txA’TONS ’A NS tTAI.D 11...NOTE S T edder, Wi.th Preudice: The War Memoirs . - y Air Force. Lord Tedaer. rr- 40-43. 2.".~ : X :"~ , M~.c, ’ = A r Power in Three Wars WW 7:, Kora...that FEAF assume operational control over land based Marine air units and over carri.er bjdsed aviation operating over Korea effective as soon as X

  3. Surgical Fires and Operative Burns: Lessons Learned From a 33-Year Review of Medical Litigation.

    Science.gov (United States)

    Choudhry, Asad J; Haddad, Nadeem N; Khasawneh, Mohammad A; Cullinane, Daniel C; Zielinski, Martin D

    2017-03-01

    We aimed to understand the setting and litigation outcomes of surgical fires and operative burns. Westlaw, an online legal research data-set, was utilized. Data were collected on patient, procedure, and case characteristics. One hundred thirty-nine cases were identified; 114 (82%) operative burns and 25 (18%) surgical fires. Median plaintiff (patient) age was 46 (IQR:28-59). Most common site of operative burn was the face (26% [n = 36]). Most common source of injury was a high energy device (43% [n = 52]). Death was reported in 2 (1.4%) cases. Plaintiff age <18 vs age 18-50 and mention of a non-surgical physician as a defendant both were shown to be independently associated with an award payout (OR = 4.90 [95% CI, 1.23-25.45]; p = .02) and (OR = 4.50 [95% CI, 1.63-13.63]; p = .003) respectively. Plaintiff award payment (settlement or plaintiff verdict) was reported in 83 (60%) cases; median award payout was $215,000 (IQR: $82,000-$518,000). High energy devices remain as the most common cause of injury. Understanding and addressing pitfalls in operative care may mitigate errors and potentially lessen future liability. III. Copyright © 2016 Elsevier Inc. All rights reserved.

  4. Upgrading of operation and maintenance. Lessons learned by ENEL- Nuclear Plant Management

    International Nuclear Information System (INIS)

    Bolla, Giuseppe; Panini, Giulio

    1999-01-01

    A presentation and general information on ENEL are given. The Italian Authority for Electric Energy (Ente Nazionale per l'Energia Electrica - ENEL), entirely owned by the Italian Ministry of Treasury, is the third largest utility in the world after EDF of France and TEPCO of Japan. The following figures are featuring its size: - Net maximum capacity = 52.463 GW; - Power generation = 182,500 GW h; - Customer = 28.2 Million; - Hydroelectric power plants = 651 (16.327 MW); - Thermoelectric power units = 206 (35,666 MW); - Geothermal power units = 36 (470 MW). The ENEL core business consists of generation, transmission, distribution and sale throughout Italy of electric power produced from any source as well as the importation and exportation of electric power and the co-ordination of operational and planning activities in order to ensure adequate availability throughout Italian territory of electric power at minimum cost. Before the decision taken for political reason by Italian Government in 1988 to terminate nuclear power plants operation and construction, 4 NPPs have been successfully operated. The whole production of the four plants has been about 90 billion kWh. The management experience for these plants has been good, both for plant availability and safety. No operating events occurred arising any risk for workers, population and environment. The Chernobyl power plant accident induced Italy to promote the 'nuclear referendum' in November 1987. Following the referendum the nuclear power production was interrupted. After 1988 the following nuclear activities has been carried out: - plant safe conservation, decommissioning planning, cost evaluation and safe enclosure preparation; - investigation for waste treatment methods; - participation in requirement definition and design activity for next NPP generation. A specific experience has been accumulated in the decommissioning of Italian NPPs, due to their anticipated shutdown, in particular in the field of

  5. The Joint Lessons Learned System and Interoperability

    Science.gov (United States)

    1989-06-02

    Learned: 1988-1989 As mentioned in the introduction to this chaoter, the Organizacion of the JcinC Chiefs cf Staff .OJCS) ueren significant transformatioi...Organization and Functions Manual . Washington, D.C.: HQDA, Office of the Deputy Chief 0f Staff for Operations and Plans, June 1984. ’..S. Army. Concept...U.S. Department of Defense. Joint Universal Lessons Learned System (JULLS) User’s Manual . Orlando, Florida: University of Central Florida, Institute

  6. Lessons learned from operating experience can improve future light water reactor design

    International Nuclear Information System (INIS)

    Basso, G.

    1983-01-01

    The abundant and detailed documentation already existing in the field of operating experience of U.S.A. nuclear plants allows us to evaluate on a statistical basis the real reliability and availability of specific classes of components and systems. However the multiple connections of mechanical, electrical, electronic, chemical, structural components, which interact each other in many different modes and constitute indeed a single functional complex, make the casual linkage of failures and abnormal occurrences to individual components in some extent arbitrary. In fact many failures and abnormal occurrences originate from generic problems and design deficiencies which do not pertain to the effected components. As a consequence of this, the verification of component reliability may be considered a preliminary step in the process of assessing the safety level of a nuclear plant or improving its operating availability. Further analysis of afilure data in the context of the overall interconnected plant are required for bringing to light the real, remote causes

  7. The Belgian End of Mission Transition Period: Lessons Learned from Third Location Decompression after Operational Deployment

    Science.gov (United States)

    2011-04-01

    Third Location Decompression after Operational Deployment 11 - 2 RTO-MP-HFM-205 programs is based upon the literature on combat motivation ...exposure to normal leisure activities and tourism . Massage is another interesting element in the French program. Each soldier receives at least one... gastronomy ; during the French TLD, soldiers were allowed to drink wine or beer with their meal starting at 7pm and bars closed at 1am ultimately. Alcohol

  8. Operational Space-Assisted Irrigation Advisory Services: Overview Of And Lessons Learned From The Project DEMETER

    Science.gov (United States)

    Osann Jochum, M. A.; Demeter Partners

    2006-08-01

    The project DEMETER (DEMonstration of Earth observation TEchnologies in Routine irrigation advisory services) was dedicated to assessing and demonstrating improvements introduced by Earth observation (EO) and Information and Communication Technologies (ICT) in farm and Irrigation Advisory Service (IAS) day-to-day operations. The DEMETER concept of near-real-time delivery of EO-based irrigation scheduling information to IAS and farmers has proven to be valid. The operationality of the space segment was demonstrated for Landsat 5-TM in the Barrax pilot zone during the 2004 and 2005 irrigation campaigns. Extra-fast image delivery and quality controlled operational processing make the EO-based crop coefficient maps available at the same speed and quality as ground-based data (point samples), while significantly extending the spatial coverage and reducing service cost. Leading-edge online analysis and visualization tools provide easy, intuitive access to the information and personalized service to users. First feedback of users at IAS and farmer level is encouraging. The paper gives an overview of the project and its main achievements.

  9. MAHLI on Mars: lessons learned operating a geoscience camera on a landed payload robotic arm

    Science.gov (United States)

    Aileen Yingst, R.; Edgett, Kenneth S.; Kennedy, Megan R.; Krezoski, Gillian M.; McBride, Marie J.; Minitti, Michelle E.; Ravine, Michael A.; Williams, Rebecca M. E.

    2016-06-01

    The Mars Hand Lens Imager (MAHLI) is a 2-megapixel, color camera with resolution as high as 13.9 µm pixel-1. MAHLI has operated successfully on the Martian surface for over 1150 Martian days (sols) aboard the Mars Science Laboratory (MSL) rover, Curiosity. During that time MAHLI acquired images to support science and science-enabling activities, including rock and outcrop textural analysis; sand characterization to further the understanding of global sand properties and processes; support of other instrument observations; sample extraction site documentation; range-finding for arm and instrument placement; rover hardware and instrument monitoring and safety; terrain assessment; landscape geomorphology; and support of rover robotic arm commissioning. Operation of the instrument has demonstrated that imaging fully illuminated, dust-free targets yields the best results, with complementary information obtained from shadowed images. The light-emitting diodes (LEDs) allow satisfactory night imaging but do not improve daytime shadowed imaging. MAHLI's combination of fine-scale, science-driven resolution, RGB color, the ability to focus over a large range of distances, and relatively large field of view (FOV), have maximized the return of science and science-enabling observations given the MSL mission architecture and constraints.

  10. Operational, quality, and risk management in the transfusion service: lessons learned.

    Science.gov (United States)

    Goodnough, Lawrence Tim

    2012-07-01

    For general health care, the difference between quality and safety has been unclear for measurable patient outcomes. In contrast, in the transfusion service (TS), the relationship between quality and safety has been direct and demonstrable. Case studies are summarized to illustrate the relationship between operations, quality management, and risk management in the TS. In blood availability for elective surgery over 3 audited intervals, the incidence of patients undergoing elective surgery without available crossmatched blood that had been requested was 1:333, 1:328, and 1:225 for pre-quality improvement, post-quality improvement, and subsequent postintervention audit assessment, respectively. In event discovery reports (EDRs) over 2 years, incidence of biologic product deviation reports (Food and Drug Administration reportable) was successfully reduced from 60 biologic product deviation reports (12%) of 507 EDRs in 2009 to 42 (12%) of 336 EDRs in 2010. In wrong blood in tube, 102 specimens were identified (by a change in patient's ABO/Rh) from 176,711 type and screen/cross-match specimens received over a 5-year interval, detected either by previous patient record of ABO/Rh or by a second specimen for blood type confirmation implemented in our TS for the last 3 years. No known cases of "mismatched" red blood cell transfusion have occurred during this interval. There is an inverse relationship between resources/time expended on quality and risk management relative to volumes of operations in the TS. Laboratory-based initiatives that improve patient safety and clinical outcomes need to have resources aligned with the personnel and time required for quality management and risk management. Copyright © 2012 Elsevier Inc. All rights reserved.

  11. FPGAs operating in a radiation environment: lessons learned from FPGAs in space

    International Nuclear Information System (INIS)

    Wirthlin, M J

    2013-01-01

    Field Programmable Gate Arrays (FPGAs) are increasingly being used as a key component of digital systems because of their in-field reprogrammability, low non-recurring engineering costs (NRE), and relatively short design cycle. Recently, there has been great interest in using FPGAs within spacecraft. FPGAs, like all semiconductor devices, are susceptible to the effects of radiation. There is an active research community investigating the effects of radiation on FPGAs and developing methods to mitigate against these effects. There has been significant progress over the last decade in the understanding and developing FPGA technology that is resistant to the effects of radiation. The success of FPGAs within spacecraft suggests that FPGAs may be used in particle physics experiments where radiation levels are considerable higher than the conventional terrestrial earth environment. This paper will summarize the effects of radiation on FPGAs, methods to mitigate against these effects, provide a case study of a successful FPGA system operating in space, and discuss the issues that will affect the use of FPGAs within particle physics experiments.

  12. Keynote speech - Manned Space Flights: Lessons Learned from Space Craft Operation and Maintenance

    CERN Multimedia

    CERN. Geneva

    2013-01-01

    Following graduation in 1973 from the Ecole de l'Air (the French Air Force Academy), Michel Tognini served in the French Air Force as an operational fighter pilot, flight leader in 1976, flight commander in 1979, test pilot then chief test pilot from 1983 to 1985. In 1985, France opened a recruitment program to expand its astronaut corps, and Michel Tognini was one of seven candidates selected by CNES. In July 1986, he was one of four candidates to undergo medical examinations in Moscow. In August 1986, he was assigned as a back-up crew member for the Soyuz TM-7 mission. Although he remained a French Air Force officer, he was placed on detachment to CNES for his space flight activities from September 1986 onwards. In 1991 he went to Star City, Russia, to start prime crew training for the third Soviet-French ANTARES mission. During his stay in Russia, he linked up with Mir (ANTARES mission) and spent 14 days (July 27–Aug. 10, 1992; Soyuz TM-14 and TM-14)carrying out a program of joint Soviet-French experimen...

  13. Learning lessons from operational research in infectious diseases: can the same model be used for noncommunicable diseases in developing countries?

    Directory of Open Access Journals (Sweden)

    Bosu WK

    2014-12-01

    Full Text Available William K Bosu Department of Epidemics and Disease Control, West African Health Organisation, Bobo-Dioulasso, Burkina Faso Abstract: About three-quarters of global deaths from noncommunicable diseases (NCDs occur in developing countries. Nearly a third of these deaths occur before the age of 60 years. These deaths are projected to increase, fueled by such factors as urbanization, nutrition transition, lifestyle changes, and aging. Despite this burden, there is a paucity of research on NCDs, due to the higher priority given to infectious disease research. Less than 10% of research on cardiovascular diseases comes from developing countries. This paper assesses what lessons from operational research on infectious diseases could be applied to NCDs. The lessons are drawn from the priority setting for research, integration of research into programs and routine service delivery, the use of routine data, rapid-assessment survey methods, modeling, chemoprophylaxis, and the translational process of findings into policy and practice. With the lines between infectious diseases and NCDs becoming blurred, it is justifiable to integrate the programs for the two disease groups wherever possible, eg, screening for diabetes in tuberculosis. Applying these lessons will require increased political will, research capacity, ownership, use of local expertise, and research funding. Keywords: infectious diseases, noncommunicable diseases, operational research, developing countries, integration

  14. Leadership Challenges in ISS Operations: Lessons Learned from Junior and Senior Mission Control Personnel

    Science.gov (United States)

    Clement, James L.; Ritsher, Jennifer Boyd; Saylor, Stephanie A.; Kanas, Nick

    2006-01-01

    The International Space Station (ISS) is operated by a multi-national, multi-organizational team that is dispersed across multiple locations, time zones, and work schedules. At NASA, both junior and senior mission control personnel have had to find ways to address the leadership challenges inherent in such work, but neither have had systematic training in how to do so. The goals of this study were to examine the major leadership challenges faced by ISS mission control personnel and to highlight the approaches that they have found most effective to surmount them. We pay particular attention to the approaches successfully employed by the senior personnel and to the training needs identified by the junior personnel. We also evaluate the extent to which responses are consistent across the junior and senior samples. Further, we compare the issues identified by our interview survey to those identified by a standardized questionnaire survey of mission control personnel and a contrasting group of space station crewmembers. We studied a sample of 14 senior ISS flight controllers and a contrasting sample of 12 more junior ISS controllers. Data were collected using a semi-structured qualitative interview and content analyzed using an iterative process with multiple coders and consensus meetings to resolve discrepancies. To further explore the meaning of the interview findings, we also conducted new analyses of data from a previous questionnaire study of 13 American astronauts, 17 Russian cosmonauts, and 150 U.S. and 36 Russian mission control personnel supporting the ISS or Mir space stations. The interview data showed that the survey respondents had substantial consensus on several leadership challenges and on key strategies for dealing with them, and they offered a wide range of specific tactics for implementing these strategies. Interview data from the junior respondents will be presented for the first time at the meeting. The questionnaire data showed that the US mission

  15. Lessons Learned from GOSAT; Instrument Design, Calibration, Operation, Data Processing, and International Collaboration

    Science.gov (United States)

    Kuze, A.; Suto, H.; Shiomi, K.; Nakajima, M.

    2012-12-01

    Advantage of satellite observation is its ability to monitor long term and global distribution with a single instrument. Ozone observation from space has been successful for long term monitoring purposes. Monitoring gradual increase and distribution of greenhouse gases in the troposphere with sub-percent accuracy has become a challenging subject. Interference of cloud and aerosol in radiative transfer has to be corrected for troposphere measurement. Accurate O2-A band measurement can retrieve surface pressure and aerosol distribution property. We have selected a Fourier Transform spectrometer (FTS) to achieve high throughput and wide spectral coverage with uniform spectral resolution. On the other hand, it is difficult to modulate short wave such as 0.76μm and avoid micro vibration interference. Prelaunch, we took special care to select optical components of excellent surface quality and isolate vibration. Design parameters such as IFOV, spectral resolution, observation interval within limited satellite resources must be carefully optimized. Greenhouse gases Observing SATellite (GOSAT) has been providing global high spectral resolution data for almost 4 years. Instrument performance, radiometric calibration, radiative transfer calculation and laboratory spectroscopy are all important. The first step was to reduce bias of column-averaged dry air mole fractions (the Level 2 product) of CO2 and CH4 (XCO2 and XCH4) and validate using well calibrated data such as TCCON. After 2 years of operation, latitudinal distribution of zonal mean and seasonal variation at these sites can be measured with better than 2ppm accuracy. However, validations are limited to ideal conditions. Next step is to evaluate consistency of measured values from long periods since launch, different surface types, and various input radiance with different instrument gain. For long term radiometric calibration, we have uses vicarious, onboard solar diffuser, and lunar calibration data. Over the ocean

  16. EMU Lessons Learned Database

    Science.gov (United States)

    Matthews, Kevin M., Jr.; Crocker, Lori; Cupples, J. Scott

    2011-01-01

    As manned space exploration takes on the task of traveling beyond low Earth orbit, many problems arise that must be solved in order to make the journey possible. One major task is protecting humans from the harsh space environment. The current method of protecting astronauts during Extravehicular Activity (EVA) is through use of the specially designed Extravehicular Mobility Unit (EMU). As more rigorous EVA conditions need to be endured at new destinations, the suit will need to be tailored and improved in order to accommodate the astronaut. The Objective behind the EMU Lessons Learned Database(LLD) is to be able to create a tool which will assist in the development of next-generation EMUs, along with maintenance and improvement of the current EMU, by compiling data from Failure Investigation and Analysis Reports (FIARs) which have information on past suit failures. FIARs use a system of codes that give more information on the aspects of the failure, but if one is unfamiliar with the EMU they will be unable to decipher the information. A goal of the EMU LLD is to not only compile the information, but to present it in a user-friendly, organized, searchable database accessible to all familiarity levels with the EMU; both newcomers and veterans alike. The EMU LLD originally started as an Excel database, which allowed easy navigation and analysis of the data through pivot charts. Creating an entry requires access to the Problem Reporting And Corrective Action database (PRACA), which contains the original FIAR data for all hardware. FIAR data are then transferred to, defined, and formatted in the LLD. Work is being done to create a web-based version of the LLD in order to increase accessibility to all of Johnson Space Center (JSC), which includes converting entries from Excel to the HTML format. FIARs related to the EMU have been completed in the Excel version, and now focus has shifted to expanding FIAR data in the LLD to include EVA tools and support hardware such as

  17. Sharing Lessons Learned Between Industries in EU

    International Nuclear Information System (INIS)

    Muehleisen, A.; Strucic, M.

    2012-01-01

    Recent events in nuclear industry remind us on importance of continuous sharing of the knowledge and experience gained through evaluations of incidents and accidents. We frequently use experience from our daily life activities to improve our performance and avoid some mistakes or unwanted events. In the similar way we can use other industries experience. These experiences can be applied to improve nuclear safety. For example, Safety Culture, which has a great influence on the level of nuclear power plants safety, is similarly presented in other industries. Mechanisms which led to accidents from weak safety culture in one branch of other industry could be comparable to those in nuclear industry. Some other industries have many more cumulative years of experience than nuclear industry. Aviation and Oil industries are typical representatives. Part of their experience can be used in nuclear industry too. Number of reports from nuclear power plants showed us that not only specific equipment related causes lay behind accidents; there are also other causes and contributors which are more common for all industries. Hence lessons learned in other industry should be assessed and used in nuclear industry too. In the European Union, a regional initiative has been set up in 2008 in support of EU Member State nuclear safety authorities, but also EU technical support organizations, international organizations and the broader nuclear community, to enhance nuclear safety through improvement of the use of lessons learned from operational experience of nuclear power plants (NPPs). The initiative, called ''the EU Clearinghouse on Operational Experience Feedback for NPP'', is organized as a network operated by a centralized office located at the Joint Research Centre of the European Commission. The reduction of occurrence and significance of events in NPPs and their safe operation is its ultimate goal. Among others EU Clearinghouse provides services such as technical and scientific

  18. Lessons learned in crisis management.

    Science.gov (United States)

    Olson, Chris

    2014-01-01

    This paper will explore lessons learned following a series of natural and man-made disasters affecting the Massachusetts Mutual Life Insurance Company and/or its subsidiaries. The company employs a team of certified continuity professionals who are charged with overseeing resilience on behalf of the enterprise and leading recovery activities wherever and whenever necessary.

  19. Basic safety principles: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Erp, J.B. van [Argonne National Lab., IL (United States)

    1997-09-01

    The presentation reviews the following issues: basic safety principles and lessons learned; some conclusions from the Kemeny report on the accident at TMI; some recommendations from the Kemeny report on the accident at TMI; conclusions and recommendations from the Rogovin report on the accident on TMI; instrumentation deficiencies (from Rogovin report).

  20. Basic safety principles: Lessons learned

    International Nuclear Information System (INIS)

    Erp, J.B. van

    1997-01-01

    The presentation reviews the following issues: basic safety principles and lessons learned; some conclusions from the Kemeny report on the accident at TMI; some recommendations from the Kemeny report on the accident at TMI; conclusions and recommendations from the Rogovin report on the accident on TMI; instrumentation deficiencies (from Rogovin report)

  1. N Reactor Lessons Learned workshop

    International Nuclear Information System (INIS)

    Heaberlin, S.W.

    1993-07-01

    This report describes a workshop designed to introduce participants to a process, or model, for adapting LWR Safety Standards and Analysis Methods for use on rector designs significantly different than LWR. The focus of the workshop is on the ''Lessons Learned'' from the multi-year experience in the operation of N Reactor and the efforts to adapt the safety standards developed for commercial light water reactors to a graphite moderated, water cooled, channel type reactor. It must be recognized that the objective of the workshop is to introduce the participants to the operation of a non-LWR in a LWR regulatory world. The total scope of this topic would take weeks to provide a through overview. The objective of this workshop is to provide an introduction and hopefully establish a means to develop a longer term dialogue for technical exchange. This report provides outline of the workshop, a proposed schedule of the workshop, and a description of the tasks will be required to achieve successful completion of the project

  2. FRMAC-93 lessons learned report

    International Nuclear Information System (INIS)

    Kerns, K.C.

    1994-03-01

    FRMAC-93 simulated a radiological accident at the Fort Calhoun nuclear power plant, 25 miles north of Omaha, Nebraska. The exercise involved the state Iowa and Nebraska, NRC as the lead Federal agency, FRMAC (Federal Radiological Monitoring and Assessment Center), and several federal agencies with statutory emergency responsibility. FRMAC-93 was a major 2-day field exercise designed to determine the effectiveness, coordination, and operations of a DOE-managed FRMAC. Other objectives were to ensure that appropriate priorities were established and assistance was provided to the states and the lead Federal agency by FRMAC. Day 1 involved the Fort Calhoun evaluated plume phase exercise. On Day 2, the flow of data, which was slow initially, improved so that confidence of states and other federal responders in FRMAC support capabilities was high. The impact and lessons learned from FRMAC-93 provided the necessary impetus to make organizational and operational changes to the FRMAC program, which were put into effect in the DOE exercise FREMONT at Hanford 3 months later

  3. The X-15 airplane - Lessons learned

    Science.gov (United States)

    Dana, William H.

    1993-01-01

    The X-15 rocket research airplane flew to an altitude of 354,000 ft and reached Mach 6.70. In almost 200 flights, this airplane was used to gather aerodynamic-heating, structural loads, stability and control, and atmospheric-reentry data. This paper describes the origins, design, and operation of the X-15 airplane. In addition, lessons learned from the X-15 airplane that are applicable to designing and testing the National Aero-Space Plane are discussed.

  4. Lessons learned in applying function analysis

    International Nuclear Information System (INIS)

    Mitchel, G.R.; Davey, E.; Basso, R.

    2001-01-01

    This paper summarizes the lessons learned in undertaking and applying function analysis based on the recent experience of utility, AECL and international design and assessment projects. Function analysis is an analytical technique that can be used to characterize and asses the functions of a system and is widely recognized as an essential component of a 'systematic' approach to design, on that integrated operational and user requirements into the standard design process. (author)

  5. Lessons learned from Spain's nuclear program

    International Nuclear Information System (INIS)

    Garcia Rodriguez, A.

    1993-01-01

    The commercial nuclear program in Spain dates back to the beginning of the 1960s. There are currently nine units in operation, one more has been decommissioned and a further five are in different phases of construction but under nuclear moratorium since 1983. This article gives a general overview of the program, the criteria applied, what it has meant to and required of the industry and, finally, what lessons have been learned. (author) 2 figs

  6. Value pricing pilot program : lessons learned

    Science.gov (United States)

    2008-08-01

    This "Lessons Learned Report" provides a summary of projects sponsored by the Federal Highway Administration's (FHWA's) Congestion and Value Pricing Pilot Programs from 1991 through 2006 and draws lessons from a sample of projects with the richest an...

  7. Shuttle Lesson Learned - Toxicology

    Science.gov (United States)

    James, John T.

    2010-01-01

    This is a script for a video about toxicology and the space shuttle. The first segment is deals with dust in the space vehicle. The next segment will be about archival samples. Then we'll look at real time on-board analyzers that give us a lot of capability in terms of monitoring for combustion products and the ability to monitor volatile organics on the station. Finally we will look at other issues that are about setting limits and dealing with ground based lessons that pertain to toxicology.

  8. Mission control team structure and operational lessons learned from the 2009 and 2010 NASA desert RATS simulated lunar exploration field tests

    Science.gov (United States)

    Bell, Ernest R.; Badillo, Victor; Coan, David; Johnson, Kieth; Ney, Zane; Rosenbaum, Megan; Smart, Tifanie; Stone, Jeffry; Stueber, Ronald; Welsh, Daren; Guirgis, Peggy; Looper, Chris; McDaniel, Randall

    2013-10-01

    team the opportunity to gain insight into functional hardware requirements via lessons learned from executing the Desert RATS field test missions. This paper will detail the mission control team structure that was used during the 2009 and 2010 Desert RATS Lunar analog missions. It will also present a number of the lessons learned by the operations team during these field tests. Major lessons learned involved Mission Control Center (MCC) operations, pre-mission planning and training processes, procedure requirements, communication requirements, and logistic support for analogs. This knowledge will be applied to future Desert RATS field tests, and other Earth based analog testing for space exploration, to continue the evolution of manned space operations in preparation for human planetary exploration. It is important that operational knowledge for human space exploration missions be obtained during Earth-bound field tests to the greatest extent possible. This allows operations personnel the ability to examine various flight control and crew operations scenarios in preparation for actual space missions.

  9. TMI-2 lessons have been learned

    International Nuclear Information System (INIS)

    Long, R.L.

    1994-01-01

    This paper is an introduction to the more detailed papers which are presented in this session titled ''Advanced Light Water Reactors -- 15 Years After TMI.'' Many of the advances in the design, operation and maintenance of nuclear power plants are the direct result of applying lessons learned from the 1979 TMI-2 accident. The authors believe the ''reality awakening'' which occurred following the accident should never be forgotten. Thus, this paper briefly reviews the TMI-2 accident and identifies the broad lessons learned following the accident. Then it describes briefly some indicators which show the very impressive improvements in nuclear power plant performance that have occurred over the past 10-15 years. This sets the stage for Dr. Ransom's paper which shows the continuing need for nuclear power, Dr. Beckjord's paper which describes the ''final'' TMI-2 research project and the subsequent papers which focus on advanced light water reactor developments

  10. Lessons learned from accident simulation exercises and their implications for operation of the IPSN Centre Technique de Crise

    International Nuclear Information System (INIS)

    Manesse, D.; Ney, J.; Crabol, B.; Ginot, P.

    1990-01-01

    The Centre Technique de Crise (CTC) of the Institut de Protection et de Surete Nucleaire (IPSN) has an important role to play in the event of an accident at a nuclear installation of Electricite de France (EdF) concerning diagnosis of the situation and forecasting its evolution. For this purpose the CTS is organized into various groups; only that responsible for the evaluation of the radiological consequences is considered in the present paper. Since the beginning of the eighties numerous simulations of nuclear accidents have been organized both by the public authorities and by the nuclear operators. These exercises, of growing complexity, are distinguished according to the type of installation concerned, the scenario (with and without a simulator), the equipment involved, the participants (local and national officials), the accident phase used (at the time of the accident or post-accident), the use of actual or pre-determined meteorological conditions etc.. Different combinations are imposed as a function of the specific aims of each exercise. Numerous lessons have been drawn progressively from these very varied exercises for the operation of the CTC and, in particular, of the Radiological Consequences Group. The principal Lessons concern: development of calculation and mapping tools, specific liaison with the national meteorological services, modification of the centre's facilities, composition of the team and definition of the role of each of its members, improved liaison with the Site Evaluation Group and the provision of appropriate documentation. The need for continuous training of duty teams in the form of presentations and exercises has also been confirmed

  11. Comparisons and Lessons Learned

    NARCIS (Netherlands)

    Jensen, PA; van der Voordt, Theo; Coenen, C; Sarasoja, AL; van der Voordt, DJM; Jensen, PA; Coenen, C

    2012-01-01

    Purpose: To create an overview and evaluation of the achievements of the contributions in this book by identifying, summarising and discussing cross-cutting themes and essential learning points across the former chapters.
    Methodology: Based on a purposeful reading of all chapters comparisons are

  12. Lessons learned from failure analysis

    International Nuclear Information System (INIS)

    Le May, I.

    2006-01-01

    Failure analysis can be a very useful tool to designers and operators of plant and equipment. It is not simply something that is done for lawyers and insurance companies, but is a tool from which lessons can be learned and by means of which the 'breed' can be improved. In this presentation, several failure investigations that have contributed to understanding will be presented. Specifically, the following cases will be discussed: 1) A fire at a refinery that occurred in a desulphurization unit. 2) The failure of a pipeline before it was even put into operation. 3) Failures in locomotive axles that took place during winter operation. The refinery fire was initially blamed on defective Type 321 seamless stainless steel tubing, but there were conflicting views between 'experts' involved as to the mechanism of failure and the writer was called upon to make an in-depth study. This showed that there were a variety of failure mechanism involved, including high temperature fracture, environmentally-induced cracking and possible manufacturing defects. The unraveling of the failure sequence is described and illustrated. The failure of an oil transmission was discovered when the line was pressure tested some months after it had been installed and before it was put into service. Repairs were made and failure occurred in another place upon the next pressure test being conducted. After several more repairs had been made the line was abandoned and a lawsuit was commenced on the basis that the steel was defective. An investigation disclosed that the material was sensitive to embrittlement and the causes of this were determined. As a result, changes were made in the microstructural control of the product to avoid similar problems in future. A series of axle failures occurred in diesel electric locomotives during winter. An investigation was made to determine the nature of the failures which were not by classical fatigue, nor did they correspond to published illustrations of Cu

  13. Low level waste shipment accident lessons learned

    International Nuclear Information System (INIS)

    Rast, D.M.; Rowe, J.G.; Reichel, C.W.

    1995-01-01

    On October 1, 1994 a shipment of low-level waste from the Fernald Environmental Management Project, Fernald, Ohio, was involved in an accident near Rolla, Missouri. The accident did not result in the release of any radioactive material. The accident did generate important lessons learned primarily in the areas of driver and emergency response communications. The shipment was comprised of an International Standards Organization (ISO) container on a standard flatbed trailer. The accident caused the low-level waste package to separate from the trailer and come to rest on its top in the median. The impact of the container with the pavement and median inflicted relatively minor damage to the container. The damage was not substantial enough to cause failure of container integrity. The success of the package is attributable to the container design and the packaging procedures used at the Fernald Environmental Management Project for low-level waste shipments. Although the container survived the initial wreck, is was nearly breached when the first responders attempted to open the ISO container. Even though the container was clearly marked and the shipment documentation was technically correct, this information did not identify that the ISO container was the primary containment for the waste. The lessons learned from this accident have DOE complex wide applicability. This paper is intended to describe the accident, subsequent emergency response operations, and the lessons learned from this incident

  14. Lessons Learned for Decommissioning Planning

    International Nuclear Information System (INIS)

    Sohn, Wook; Kim, Young-gook; Kim, Hee-keun

    2015-01-01

    The purpose of this paper is to introduce the U.S. nuclear industrial's some key lessons learned especially for decommissioning planning based on which well informed decommissioning planning can be carried out. For a successful decommissioning, it is crucial to carry out a well-organized decommissioning planning before the decommissioning starts. This paper discussed four key factors which should be decided or considered carefully during the decommissioning planning period with introduction of related decommissioning lessons learned of U.S. nuclear industry. Those factors which have been discussed in this paper include the end state of a site, the overall decommissioning strategy, the management of the spent fuels, and the spent fuel pool island. Among them, the end state of a site should be decided first as it directs the whole decommissioning processes. Then, decisions on the overall decommissioning strategy (DECON vs. SAFSTOR) and the management of the spent fuels (wet vs. dry) should follow. Finally, the spent fuel pool island should be given due consideration because its implementation will result in much cost saving. Hopefully, the results of this paper would provide useful inputs to performing the decommissioning planing for the Kori unit 1

  15. Eisenhower and Manstein: Operational Leadership Lessons of the Past for Today's Commanders

    National Research Council Canada - National Science Library

    Herbert, IV, William E

    2007-01-01

    .... Additionally, this paper will highlight recent failures in operational leadership and compare and contrast them with lessons learned from two diametrically opposed operational leaders of World War II: General Dwight D...

  16. Implementing US Department of Energy lessons learned programs. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The DOE Lessons Learned Handbook is a two-volume publication developed to supplement the DOE Lessons Learned Standard (DOE-STD-7501-95) with information that will organizations in developing or improving their lessons learned programs. Volume 1 includes greater detail than the Standard in areas such as identification and documentation of lessons learned; it also contains sections on specific processes such as training and performance measurement. Volume 2 (this document) contains examples of program documents developed by existing lessons learned programs as well as communications material, functional categories, transmittal documents, sources of professional and industry lessons learned, and frequently asked questions about the Lessons Learned List Service.

  17. Lunar polar rover science operations: Lessons learned and mission architecture implications derived from the Mojave Volatiles Prospector (MVP) terrestrial field campaign

    Science.gov (United States)

    Heldmann, Jennifer L.; Colaprete, Anthony; Elphic, Richard C.; Lim, Darlene; Deans, Matthew; Cook, Amanda; Roush, Ted; Skok, J. R.; Button, Nicole E.; Karunatillake, S.; Stoker, Carol; Marquez, Jessica J.; Shirley, Mark; Kobayashi, Linda; Lees, David; Bresina, John; Hunt, Rusty

    2016-08-01

    The Mojave Volatiles Prospector (MVP) project is a science-driven field program with the goal of producing critical knowledge for conducting robotic exploration of the Moon. Specifically, MVP focuses on studying a lunar mission analog to characterize the form and distribution of lunar volatiles. Although lunar volatiles are known to be present near the poles of the Moon, the three dimensional distribution and physical characteristics of lunar polar volatiles are largely unknown. A landed mission with the ability to traverse the lunar surface is thus required to characterize the spatial distribution of lunar polar volatiles. NASA's Resource Prospector (RP) mission is a lunar polar rover mission that will operate primarily in sunlit regions near a lunar pole with near-real time operations to characterize the vertical and horizontal distribution of volatiles. The MVP project was conducted as a field campaign relevant to the RP lunar mission to provide science, payload, and operational lessons learned to the development of a real-time, short-duration lunar polar volatiles prospecting mission. To achieve these goals, the MVP project conducted a simulated lunar rover mission to investigate the composition and distribution of surface and subsurface volatiles in a natural environment with an unknown volatile distribution within the Mojave Desert, improving our understanding of how to find, characterize, and access volatiles on the Moon.

  18. LESSONS LEARNED IN TESTING OF SAFEGUARDS EQUIPMENT

    International Nuclear Information System (INIS)

    Pepper, S.; Farnitano, M.; Carelli, J.; Hazeltine, J.; Bailey, D.

    2001-01-01

    The International Atomic Energy Agency's (IAEA) Department of Safeguards uses complex instrumentation for the application of safeguards at nuclear facilities around the world. Often, this equipment is developed through cooperation with member state support programs because the Agency's requirements are unique and are not met by commercially available equipment. Before approving an instrument or system for routine inspection use, the IAEA subjects it to a series of tests designed to evaluate its reliability. In 2000, the IAEA began to observe operational failures in digital surveillance systems. In response to the observed failures, the IAEA worked with the equipment designer and manufacturer to determine the cause of failure. An action plan was developed to correct the performance issues and further test the systems to make sure that additional operational issues would not surface later. This paper addresses the steps taken to address operation issues related to digital image surveillance systems and the lessons learned during this process

  19. Lessons learned: wrong intraocular lens.

    Science.gov (United States)

    Schein, Oliver D; Banta, James T; Chen, Teresa C; Pritzker, Scott; Schachat, Andrew P

    2012-10-01

    To report cases involving the placement of the wrong intraocular lens (IOL) at the time of cataract surgery where human error occurred. Retrospective small case series, convenience sample. Seven surgical cases. Institutional review of errors committed and subsequent improvements to clinical protocols. Lessons learned and changes in procedures adapted. The pathways to a wrong IOL are many but largely reflect some combination of poor surgical team communication, transcription error, lack of preoperative clarity in surgical planning or failure to match the patient, and IOL calculation sheet with 2 unique identifiers. Safety in surgery involving IOLs is enhanced both by strict procedures, such as an IOL-specific "time-out," and the fostering of a surgical team culture in which all members are encouraged to voice questions and concerns. Copyright © 2012 American Academy of Ophthalmology. Published by Elsevier Inc. All rights reserved.

  20. Lessons learned from the licensing process and the operational performance of the important to safety digital application implemented at the Mexican nuclear facilities

    International Nuclear Information System (INIS)

    Ledesma-Carrion, R.

    1998-01-01

    This paper describes the main concerns detected during the licensing processes performed by the Mexican Nuclear Regulatory Commission (CNSNS) for the NUMAC-PRNM, the Integrated Computer Systems at the Laguna Verde Nuclear Power Station (LVNPS) and for the Digital Control Console of the Triga Mark III Research Reactor (TMRR). The review and approval process was performed following the guidelines of the US Nuclear Regulatory Commission (USNRC); the regulatory frame applied includes the Code of Federal Regulation (10CFR50), some Regulatory Guides, such as: RG 1.152, RG 1.153, some Industrial Standards, for example: IEEE-279, IEEE-603, IEEE-7.4.3-2. Also, based on the operational experience taken from the LVNPS License Event Report (LER) reported under the 10CFR50.72 and 10CFR50.73 USNRC rules, and from the Report of Events to be Analyzed (REA) issued for a CNSNS agreement with the utility stated by the necessity to determine failure rates of digital equipment, some case studies and a preliminary failure cause classification is shown. The Event Report evaluation covered topics related to the software, hardware and firmware issues. Finally, the lessons learned from the licensing assessments and from the operational experience of the digital applications implemented are presented. It will also give the regulatory activities related to an IAEA international cooperation project on I and C digital upgrade concerns. (author)

  1. Planning geometry lessons with learning platforms

    DEFF Research Database (Denmark)

    Tamborg, Andreas Lindenskov

    mathematics teachers’ joint planning of a lesson in geometry with a learning platform called Meebook is analyzed using the instrumental approach. It is concluded that the interface in Meebook orients the teachers work toward what the students should do rather than what they should learn, although the latter......This paper investigates how mathematics teachers plan lessons with a recently implemented Danish learning platform designed to support teachers in planning lessons in line with a recent objective-oriented curriculum. Drawing on data from observations of and interviews with teachers, three...... is a key intention behind the implementation of the platform. It is also concluded that when the teachers succeed in using learning objectives actively in their planning, the objectives support the teachers in designing lessons that correspond with their intentions. The paper concludes with a discussion...

  2. Serbian SNF Repatriation Operation. Issues, Solving, Lesson

    Energy Technology Data Exchange (ETDEWEB)

    Smirnov, A. [Research and Development Company ' Sosny' , Moscow (Russian Federation)

    2011-07-01

    For now the removal of SNF from RA reactor site (PC NFS, Serbia) is the most time-consuming and technically complicated operation under RRRFR Program. The most efficient techniques and lessons learned from other projects of the RRRFR Program as well as new unique technical decisions were used. Two big challenges were resolved during implementation of Serbian Project: (1) preparation of damaged fuel located in the packages unsuitable for transport, taking into account insufficient infrastructure of RA reactor site and (2) removal of large amount of fuel in one multimodal shipment through several transit countries. The main attention was paid to safety justification of all activities. All approvals were obtained in Russia, Serbia and transit countries. Special canisters were designed for transportation of specific RA reactor fuel (of small dimensions, unidentifiable, damaged due to corrosion). The canister design was selected to be untight - it was the most expedient decision for that case from safety perspective. The technology and a set of equipment were designed for remote removal of the fuel from the existing package (aluminum barrels and reactor channels) and placing of the fuel into the new canisters. After fabrication and assembling of the equipment theoretical and practical training of the personnel was performed. Fuel repackaging took about 5 months. SNF was transported in TUK-19 and SKODA VPVR/M casks. The baskets of large capacity were designed and fabricated for SKODA VPVR/M casks. Special requirements to drying the packages and composition of gaseous medium inside were justified to ensure fire and explosion safety. Specialized ISO-containers and transfer equipment designed under Romanian Project were used together with TUK-19 casks. A forklift and mobile rail system were used to handle SKODA VPVR/M casks under conditions of low capacity of the cranes at the facility. Due to the tight schedule of RRRFR Program as well as geographical peculiarities of RA

  3. Learning to observe mathematical learning in lesson studies

    DEFF Research Database (Denmark)

    Rasmussen, Klaus; Østergaard, Camilla Hellsten; Foss, Kristian Kildemoes

    2016-01-01

    This poster deals with lesson study (LS) in pre-service teacher education. In particular how to prepare for, carry out, and reflect upon, observations of pupil learning. Observation is of crucial importance to the lesson study process, and here we present a study of observation features which ena...... enable or hinder fruitful lesson study. While substantial research has been carried out in the general field of bserving pupils’ learning processes and teachers’ pedagogical practice, little is known about this in the particular setting of lesson study....

  4. Lessons learned: the effect of increased production rate on operation and maintenance of OPG's Western Used Fuel Dry Storage Facility

    International Nuclear Information System (INIS)

    Morton, L.; Smith, N.

    2011-01-01

    In 2010, the Western Used Fuel Dry Storage Facility (WUFDSF) located at Ontario Power Generation's (OPG's) Western Waste Management Facility in Tiverton, ON, transferred, processed and stored a record-high number of Dry Storage Containers (DSC's) from Bruce Power's nuclear generating stations. The WUFDSF has been in operation since 2002. The facility transfers, processes, and stores the used fuel from the Bruce Power generating stations located in Tiverton, Ontario. As per a contractual agreement between OPG and Bruce Power, an annual DSC production and transfer schedule is agreed to between the two parties. In 2010, an increased annual production rate of 130 DSC's was agreed to between OPG and Bruce Power. Throughout 2007, 2008 and 2009, several facility modifications had been completed in anticipation of the increased production rate. These modifications included: Installation and commissioning of a second set of welding consoles; Addition of a second vacuum drying system; Procurement of a second transfer vehicle; and, Installation of a bulk gas system for welding cover gas. In 2010, the increased production rate of 130 DSC's/year came into effect. Throughout 2010, significant lessons learned were gained related to the impact of such a high production rate on the operation and maintenance of the facility. This paper presents the challenges and successes of that operation. The facility successfully achieved its production target with no safety incidents. This high rate of production is planned to continue for several years at the facility. Some challenges continue and these are being assessed and incorporated into the facility's business plan. In order to continue being successful, the facility must look to the future for opportunities for improvement and efficiencies to be gained. (author)

  5. Lessons learned: the effect of increased production rate on operation and maintenance of OPG's Western Used Fuel Dry Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    Morton, L.; Smith, N. [Ontario Power Generation, Tiverton, ON (Canada)

    2011-07-01

    In 2010, the Western Used Fuel Dry Storage Facility (WUFDSF) located at Ontario Power Generation's (OPG's) Western Waste Management Facility in Tiverton, ON, transferred, processed and stored a record-high number of Dry Storage Containers (DSC's) from Bruce Power's nuclear generating stations. The WUFDSF has been in operation since 2002. The facility transfers, processes, and stores the used fuel from the Bruce Power generating stations located in Tiverton, Ontario. As per a contractual agreement between OPG and Bruce Power, an annual DSC production and transfer schedule is agreed to between the two parties. In 2010, an increased annual production rate of 130 DSC's was agreed to between OPG and Bruce Power. Throughout 2007, 2008 and 2009, several facility modifications had been completed in anticipation of the increased production rate. These modifications included: Installation and commissioning of a second set of welding consoles; Addition of a second vacuum drying system; Procurement of a second transfer vehicle; and, Installation of a bulk gas system for welding cover gas. In 2010, the increased production rate of 130 DSC's/year came into effect. Throughout 2010, significant lessons learned were gained related to the impact of such a high production rate on the operation and maintenance of the facility. This paper presents the challenges and successes of that operation. The facility successfully achieved its production target with no safety incidents. This high rate of production is planned to continue for several years at the facility. Some challenges continue and these are being assessed and incorporated into the facility's business plan. In order to continue being successful, the facility must look to the future for opportunities for improvement and efficiencies to be gained. (author)

  6. TMI-2 Lessons Learned Task Force. Final report

    International Nuclear Information System (INIS)

    1979-10-01

    In its final report reviewing the Three Mile Island accident, the TMI-2 Lessons Learned Task Force has suggested change in several fundamental aspects of basic safety policy for nuclear power plants. Changes in nuclear power plant design and operations and in the regulatory process are discussed in terms of general goals. The appendix sets forth specific recommendations for reaching these goals

  7. Science and Sandy: Lessons Learned

    Science.gov (United States)

    Werner, K.

    2013-12-01

    Following Hurricane Sandy's impact on the mid-Atlantic region, President Obama established a Task Force to '...ensure that the Federal Government continues to provide appropriate resources to support affected State, local, and tribal communities to improve the region's resilience, health, and prosperity by building for the future.' The author was detailed from NOAA to the Task Force between January and June 2013. As the Task Force and others began to take stock of the region's needs and develop plans to address them, many diverse approaches emerged from different areas of expertise including: infrastructure, management and construction, housing, public health, and others. Decision making in this environment was complex with many interests and variables to consider and balance. Although often relevant, science and technical expertise was not always at the forefront of this process. This talk describes the author's experience with the Sandy Task Force focusing on organizing scientific expertise to support the work of the Task Force. This includes a description of federal activity supporting Sandy recovery efforts, the role of the Task Force, and lessons learned from developing a science support function within the Task Force.

  8. There Are No New Lessons Learned, Just Old Lessons Relearned: A Case Study of Operation Iraqi Freedom Through the Eyes of Maslow

    Science.gov (United States)

    2010-04-05

    Abraham Maslow , a renowned American psychologist, prioritized human needs into four categories and his theory suggests that humans are motivated by...addressed through examination of other COIN and reconstruction operations. Endnotes 1 Abraham H. Maslow , Motivation and Personality, 3rd ed. (New...a basic understanding of Islam and provided a great contextual background for research. Maslow , Abraham H. Motivation and Personality, 3rd ed. New

  9. Lessons learnt by US nuclear plant operators

    International Nuclear Information System (INIS)

    Hill, W.

    2007-01-01

    Transparency means to communicate to the constituents openly and honestly, as soon as appear credible information. The author deals the subject in four fold: experience in the United States that have taught how not to communicate about nuclear energy; the successfully apply of these lessons learned to subsequent events; the need for transparency reaffirmed by more recent events; ongoing efforts by the United States industry to strengthen the core principles of transparency. (A.L.B.)

  10. Operating boundaries of full-scale advanced water reuse treatment plants: many lessons learned from pilot plant experience.

    Science.gov (United States)

    Bele, C; Kumar, Y; Walker, T; Poussade, Y; Zavlanos, V

    2010-01-01

    Three Advanced Water Treatment Plants (AWTP) have recently been built in South East Queensland as part of the Western Corridor Recycled Water Project (WCRWP) producing Purified Recycled Water from secondary treated waste water for the purpose of indirect potable reuse. At Luggage Point, a demonstration plant was primarily operated by the design team for design verification. The investigation program was then extended so that the operating team could investigate possible process optimisation, and operation flexibility. Extending the demonstration plant investigation program enabled monitoring of the long term performance of the microfiltration and reverse osmosis membranes, which did not appear to foul even after more than a year of operation. The investigation primarily identified several ways to optimise the process. It highlighted areas of risk for treated water quality, such as total nitrogen. Ample and rapid swings of salinity from 850 to 3,000 mg/l-TDS were predicted to affect the RO process day-to-day operation and monitoring. Most of the setpoints used for monitoring under HACCP were determined during the pilot plant trials.

  11. Variable density management in riparian reserves: lessons learned from an operational study in managed forests of western Oregon, USA.

    Science.gov (United States)

    Samuel Chan; Paul Anderson; John Cissel; Larry Lateen; Charley Thompson

    2004-01-01

    A large-scale operational study has been undertaken to investigate variable density management in conjunction with riparian buffers as a means to accelerate development of late-seral habitat, facilitate rare species management, and maintain riparian functions in 40-70 year-old headwater forests in western Oregon, USA. Upland variable retention treatments include...

  12. Influenza risk management: lessons learned from an A(H1N1) pdm09 outbreak investigation in an operational military setting.

    Science.gov (United States)

    Farrell, Margaret; Sebeny, Peter; Klena, John D; Demattos, Cecilia; Pimentel, Guillermo; Turner, Mark; Joseph, Antony; Espiritu, Jennifer; Zumwalt, John; Dueger, Erica

    2013-01-01

    At the onset of an influenza pandemic, when the severity of a novel strain is still undetermined and there is a threat of introduction into a new environment, e.g., via the deployment of military troops, sensitive screening criteria and conservative isolation practices are generally recommended. In response to elevated rates of influenza-like illness among U.S. military base camps in Kuwait, U.S. Naval Medical Research Unit No. 3 partnered with local U.S. Army medical units to conduct an A(H1N1) pdm09 outbreak investigation. Initial clinical data and nasal specimens were collected via the existent passive surveillance system and active surveillance was conducted using a modified version of the World Health Organization/U.S. Centers for Disease Control and Prevention influenza-like illness case definition [fever (T > 100.5˚F/38˚C) in addition to cough and/or sore throat in the previous 72 hours] as the screening criteria. Samples were tested via real-time reverse-transcription PCR and sequenced for comparison to global A(H1N1) pdm09 viruses from the same time period. The screening criteria used in Kuwait proved insensitive, capturing only 16% of A(H1N1) pdm09-positive individuals. While still not ideal, using cough as the sole screening criteria would have increased sensitivity to 73%. The results of and lessons learned from this outbreak investigation suggest that pandemic influenza risk management should be a dynamic process (as information becomes available regarding true attack rates and associated mortality, screening and isolation criteria should be re-evaluated and revised as appropriate), and that military operational environments present unique challenges to influenza surveillance.

  13. The use of probabilistic safety analysis in design and operation -- Lessons learned from Sizewell B. Annex 14

    International Nuclear Information System (INIS)

    Buttery, N.E.

    2002-01-01

    Probabilistic Safety Assessments (PSAs) have been used extensively in the design and licensing of Sizewell B. This paper outlines the role of PSA in the UK licensing process and describes how it has been applied to Sizewell B during both the pre-construction and pre-operational phases. From this experience a 'Living PSA' has been formulated which continues be used to support operation. The application of PSA to Sizewell B has demonstrated that it is a powerful tool with potential for future use. Its strengths and limitations as a tool need to recognised by both users and regulators. It is not a fully mechanistic means of ensuring design safety, but is an important aid to decision making. It also has the potential to allow risk judgements to be taken in conjunction with commercial and environmental issues. (author)

  14. Lessons Learned In Developing The VACIS Products

    International Nuclear Information System (INIS)

    Orphan, Victor J.

    2011-01-01

    SAIC's development of VACIS provides useful 'lessons learned' in bridging the gap from an idea to a security or contraband detection product. From a gamma densitometer idea for solving a specific Customs Service (CS) requirement (detection of drugs in near-empty tanker trucks) in mid-1990's, SAIC developed a broad line of vehicle and cargo inspections systems (over 500 systems deployed to date) based on a gamma-ray radiographic imaging technique. This paper analyzes the reasons for the successful development of VACIS and attempts to identify ''lessons learned'' useful for future security and contraband detection product developments.

  15. A Study of Strategic Lessons Learned in Vietnam. Volume VI. Conduct of the War. Book I. Operational Analyses

    Science.gov (United States)

    1980-05-09

    to the "purging" of General De Saussure after the failure of Operation Junction City in 1967. In his March 31 speech, Johnson indicated that a small...Garden City, NY: Doubleday, 1976), pp. 361, 362.’He also mentions the De Saussure incident (not by name) pp. 275, 276, but makes an error in...incident about the delayed relief of De Saussure was discussed in detail; Nulsen was then a Bn. Cmdr. in the 196th Lt Inf. Bde., and participated in the

  16. Lessons learned in CMAM implementation

    International Nuclear Information System (INIS)

    Dent, Nicky; Brown, Rebecca

    2014-01-01

    -going. Despite the need to adapt protocols and approaches to each specific context, there is a need for a common research agenda and sharing of what works and does not. Concerted efforts have been made to improve information-sharing and to draw on lessons learned to advance technical and organisational challenges. However many health workers have limited access to quality information due to barriers such as internet access and language. For example, one recent initiative identified less than 10% of resources are available in French, despite high caseloads of acute malnutrition in francophone West Africa. Key actions to address challenges in information-sharing include: -Improve availability of and access to translated information -Increase use of social media, e-learning and audio-visual materials for extended reach and use of information -Stimulate interactive dialogue and sharing between practitioners for improved problem solving and learning -Strengthen the collaboration between complementary initiatives. In one decade significant advances in the adaptation and implementation of community-based management of acute malnutrition approach have been made in various contexts, but challenges to quality service delivery, scale-up and sustainability remain. It is time to draw on what we know to support scale-up and have equitable access to treatment to the millions of children who still remain outside of existing services. (author)

  17. Experimental Design and Data Analysis in Receiver Operating Characteristic Studies: Lessons Learned from Reports in Radiology from 1997 to 20061

    Science.gov (United States)

    Shiraishi, Junji; Pesce, Lorenzo L.; Metz, Charles E.; Doi, Kunio

    2009-01-01

    Purpose: To provide a broad perspective concerning the recent use of receiver operating characteristic (ROC) analysis in medical imaging by reviewing ROC studies published in Radiology between 1997 and 2006 for experimental design, imaging modality, medical condition, and ROC paradigm. Materials and Methods: Two hundred ninety-five studies were obtained by conducting a literature search with PubMed with two criteria: publication in Radiology between 1997 and 2006 and occurrence of the phrase “receiver operating characteristic.” Studies returned by the query that were not diagnostic imaging procedure performance evaluations were excluded. Characteristics of the remaining studies were tabulated. Results: Two hundred thirty-three (79.0%) of the 295 studies reported findings based on observers' diagnostic judgments or objective measurements. Forty-three (14.6%) did not include human observers, with most of these reporting an evaluation of a computer-aided diagnosis system or functional data obtained with computed tomography (CT) or magnetic resonance (MR) imaging. The remaining 19 (6.4%) studies were classified as reviews or meta-analyses and were excluded from our subsequent analysis. Among the various imaging modalities, MR imaging (46.0%) and CT (25.7%) were investigated most frequently. Approximately 60% (144 of 233) of ROC studies with human observers published in Radiology included three or fewer observers. Conclusion: ROC analysis is widely used in radiologic research, confirming its fundamental role in assessing diagnostic performance. However, the ROC studies reported in Radiology were not always adequate to support clear and clinically relevant conclusions. © RSNA, 2009 Supplemental material: http://radiology.rsna.org/lookup/suppl/doi:10.1148/radiol.2533081632/-/DC1 PMID:19864510

  18. International Space Station Common Cabin Air Assembly Condensing Heat Exchanger Hydrophilic Coating Operation, Recovery, and Lessons Learned

    Science.gov (United States)

    Balistreri, Steven F.; Steele, John W.; Caron, Mark E.; Laliberte, Yvon J.; Shaw, Laura A.

    2013-01-01

    The ability to control the temperature and humidity of an environment or habitat is critical for human survival. These factors are important to maintaining human health and comfort, as well as maintaining mechanical and electrical equipment in good working order to support the human and to accomplish mission objectives. The temperature and humidity of the International Space Station (ISS) United States On-orbit Segment (USOS) cabin air is controlled by the Common Cabin Air Assembly (CCAA). The CCAA consists of a fan, a condensing heat exchanger (CHX), an air/water separator, temperature and liquid sensors, and electrical controlling hardware and software. The CHX is the primary component responsible for control of temperature and humidity. The CCAA CHX contains a chemical coating that was developed to be hydrophilic and thus attract water from the humid influent air. This attraction forms the basis for water removal and therefore cabin humidity control. However, there have been several instances of CHX coatings becoming hydrophobic and repelling water. When this behavior is observed in an operational CHX in the ISS segments, the unit s ability to remove moisture from the air is compromised and the result is liquid water carryover into downstream ducting and systems. This water carryover can have detrimental effects on the ISS cabin atmosphere quality and on the health of downstream hardware. If the water carryover is severe and widespread, this behavior can result in an inability to maintain humidity levels in the USOS. This paper will describe the operation of the five CCAAs within the USOS, the potential causes of the hydrophobic condition, and the impacts of the resulting water carryover to downstream systems. It will describe the history of this behavior and the actual observed impacts to the ISS USOS. Information on mitigation steps to protect the health of future CHX hydrophilic coatings as well as remediation and recovery of the full heat exchanger will be

  19. Modernization of Unit 2 at Oskarshamn NPP- Main Objectives, Experience from Design, Separation of Operational and Nuclear Safety Equipment - Lessons Learned

    International Nuclear Information System (INIS)

    Kanaan, Salah K.

    2015-01-01

    This paper aims to give a picture of Oskarshamn Nuclear Power Plant (OKG) experience from design for one of the biggest modernization project in the world and focuses on what was learned that is specific to robustness of electrical power systems, especially through Fukushima Station Blackout (SBO). The planning for unit 2 at OKG was initiated in 1967 and the plant was completed on time and was synchronized to the grid October 2, 1974 and is of type BWR. Unit 2 was originally on 580 MW. In 1982 a thermal power up-rate was performed, from 1700 MWh to 1800 MWh (106% reactor output). A decision was made to perform a modernization and a new power up-rate to 850 MW and there were several reasons for this decision; New safety regulations from Swedish Radiation Safety Authority (SSM), Ageing of important components and the initial focus was on safety and availability - Project Plant Life Extension (Plex) was established and became the largest nuclear power modernization in the world. The modernization will lead to: - New safety concept with 4 divisions instead for existing 2 with 2 new buildings South Electrical Building (SEB) and North Electrical Building (NEB); - Completely new software - based equipments for monitoring, control and I and C; - New Low Pressure Turbine, new generator and main transformer; - New MCR and simulator; - Compliance with modern reactor safety requirements; - Redundancy, Separation, Diversification, Earthquake; - Reinforcement of existing safety functions; - New Electricity - I and C (electric power incl. reinforced emergency power and control systems); - New buildings for Electricity - I and C; - Reinforcement of existing process systems as well as installation of new ones. Based on studies and good experiences on how to separate the operational and the safety equipment, the project led to a completely new safety concept. The safety concept is based on fully understanding the safety system that shall encompass all of the elements required to

  20. The Role of a Commander in Military Lessons Learned Systems

    Directory of Open Access Journals (Sweden)

    Zenon Waliński

    2015-06-01

    Full Text Available The aim of the paper is to investigate the role of a commander in military Lessons Learned systems. In order to achieve the aim, the paper presents (1 the architecture of the Lessons Learned capabilities in the U.S. Army, NATO and the Polish Armed Forces, (2 the commander’s role in the Lessons Learned process (3 the commander’s role in fostering Lessons Learned organisation culture. The paper is based on multiple case study analysis including Lessons Learned systems in NATO, the U.S. Army and the Polish Armed Forces.

  1. Lessons learned on digital systems safety

    International Nuclear Information System (INIS)

    Sivertsen, Terje

    2005-06-01

    A decade ago, in 1994, lessons learned from Halden research activities on digital systems safety were summarized in the reports HWR-374 and HWR-375, under the title 'A Lessons Learned Report on Software Dependability'. The reports reviewed all activities made at the Halden Project in this field since 1977. As such, the reports provide a wealth of information on Halden research. At the same time, the lessons learned from the different activities are made more accessible to the reader by being summarized in terms of results, conclusions and recommendations. The present report provides a new lessons learned report, covering the Halden Project research activities in this area from 1994 to medio 2005. As before, the emphasis is on the results, conclusions and recommendations made from these activities, in particular how they can be utilized by different types of organisations, such as licensing authorities, safety assessors, power companies, and software developers. The contents of the report have been edited on the basis of input from a large number of Halden work reports, involving many different authors. Brief summaries of these reports are included in the last part of the report. (Author)

  2. Two Approaches to Distance Education: Lessons Learned.

    Science.gov (United States)

    Sedlak, Robert A.; Cartwright, G. Phillip

    1997-01-01

    Outlines lessons learned by the University of Wisconsin-Stout in implementing two distance education programs, a technology program using interactive television and a hospitality program using Lotus Notes to deliver courses. Topics discussed include program concept vs. technology as stimulus for innovation, program planning/administration,…

  3. Lessons Learned from the Private Sector

    Energy Technology Data Exchange (ETDEWEB)

    Robichaud, Robert J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-07

    This session is focused on lessons learned from private sector energy projects that could be applied to the federal sector. This presentation tees up the subsequent presentations by outlining the differences between private and federal sectors in objectives, metrics for determining success, funding resources/mechanisms, payback and ROI evaluation, risk tolerance/aversion, new technology adoption perspectives, and contracting mechanisms.

  4. Commissioning MMS: Challenges and Lessons Learned

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  5. Library 101: Why, How, and Lessons Learned

    Science.gov (United States)

    Porter, Michael; King, David Lee

    2010-01-01

    This article describes how and why the Library 101 Project was created and the lessons that the developers learned out of this project. The Library 101 is a project that challenges librarians to revise the paradigm of "basic" library services in order to remain relevant in this technology-driven world. It was developed by Michael Porter,…

  6. Improving IT Project Portfolio Management: Lessons Learned

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2013-01-01

    The IT PPM improvement process is not well understood, and our knowledge about what makes IT PPM improvement succeed or fail is not well developed. This article presents lessons learned from organizations trying to improve their IT PPM practice. Based on this research IT PPM practitioners are adv...

  7. Lessons learned from existing biomass power plants

    Energy Technology Data Exchange (ETDEWEB)

    Wiltsee, G.

    2000-02-24

    This report includes summary information on 20 biomass power plants, which represent some of the leaders in the industry. In each category an effort is made to identify plants that illustrate particular points. The project experiences described capture some important lessons learned that lead in the direction of an improved biomass power industry.

  8. Automated Reasoning Across Tactical Stories to Derive Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Wesley Regian

    2008-06-01

    Full Text Available The Military Analogical Reasoning System (MARS is a performance support system and decision aid for commanders in Tactical Operations Centers. MARS enhances and supports the innate human ability for using stories to reason about tactical goals, plans, situations, and outcomes. The system operates by comparing many instances of stored tactical stories, determining which have analogous situations and lessons learned, and then returning a description of the lessons learned. The description of the lessons learned is at a level of abstraction that can be generalized to an appropriate range of tactical situations. The machine-understandable story representation is based on a military operations data model and associated tactical situation ontology. Thus each story can be thought of, and reasoned about, as an instance of an unfolding tactical situation. The analogical reasoning algorithm is based on Gentner's Structure Mapping Theory. Consider the following two stories. In the first, a U.S. platoon in Viet Nam diverts around a minefield and subsequently comes under ambush from a large hill overlooking their new position. In the second, a U.S. task force in Iraq diverts around a biochemical hazard and subsequently comes under ambush from the roof of an abandoned building. MARS recognizes these stories as analogical, and derives the following abstraction: When enemy-placed obstacles force us into an unplanned route, beware of ambush from elevation or concealment. In this paper we describe the MARS interface, military operations data model, tactical situation ontology, and analogical reasoning algorithm.

  9. Existing facilities and past practices: Lessons learned

    International Nuclear Information System (INIS)

    Huizenga, D.; Tonkay, D.W.; Owens, K.

    2000-01-01

    Article 12 of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (Joint Convention) requires parties to the Joint Convention to review the safety of existing radioactive waste management facilities 'to ensure that, if necessary, all reasonably practicable improvements are made to upgrade the safety of such a facility'. Also required is a review of the results of past practices to determine 'whether any intervention is needed for reasons of radiation protection' and to consider whether the benefits of the intervention or remediation are sufficient, with regard to the costs and the impact on workers, the public and the environment. This paper discusses the experience of the United States Department of Energy in terms of the lessons learned from operating radioactive waste management facilities and from undertaking intervention or remedial action, and from decision making in an international context. Overarching safety principles are discussed, including integrating safety into all work practices and minimizing the generation of waste. Safety review lessons learned with existing facilities are discussed with respect to: applying new requirements to old facilities, taking a life-cycle perspective of waste management, improving high level waste facility management, and blending current and past practices with respect to the process used to arrive at decisions for intervention. Special emphasis is placed on the need to provide for early and substantive input from the involved regulatory agencies, Native American tribes, and those citizens and groups with an interest in the decisions. Examples of intervention decisions are discussed, including examples taken from uranium mill tailings operations, from cleanup of a former uranium processing plant site, from evaluation of pre-1970 buried 'transuranic waste' sites, and from decommissioning or closure of high level waste storage tanks. The paper concludes that on the

  10. Functionality for learning networks: lessons learned from social web applications

    NARCIS (Netherlands)

    Berlanga, Adriana; Sloep, Peter; Brouns, Francis; Van Rosmalen, Peter; Bitter-Rijpkema, Marlies; Koper, Rob

    2007-01-01

    Berlanga, A. J., Sloep, P., Brouns, F., Van Rosmalen, P., Bitter-Rijpkema, M., & Koper, R. (2007). Functionality for learning networks: lessons learned from social web applications. Proceedings of the ePortfolio 2007 Conference. October, 18-19, 2007, Maastricht, The Netherlands. [See also

  11. Entering 'A NEW REALM' of KIBO Payload Operations - Continuous efforts for microgravity experiment environment and lessons learned from real time experiment operations in KIBO -

    International Nuclear Information System (INIS)

    Sakagami, K; Goto, M; Matsumoto, S; Ohkuma, H

    2011-01-01

    On January 22nd, 2011(JST), KOUNOTORI2 (H-II Transfer Vehicle: HTV2) was successfully launched from Tanegashima Space Center toward the International Space Station (ISS) and two new JAXA payload racks, Kobairo rack and MSPR (Multi-purpose Small Payload Rack) were transferred to ISS/KIBO (Japanese Experiment Module: JEM). In addition to Saibo rack and Ryutai rack which are already in operation in KIBO, in total 4 Japanese experiment payload racks start operations in KIBO. Then KIBO payload operations embark on a new realm, full utilization phase. While the number and variety of microgravity experiments become increasing, simultaneous operation constraints should be considered to achieve multitask payload operations in ISS/KIBO and ever more complicated cooperative operations between crewmember and flight control team/science team are required. Especially for g-jitter improvement in ISS/KIBO, we have greatly advanced cooperative operations with crewmember in the recent increment based on the microgravity data analysis results. In this paper, newly operating Japanese experiment payloads characteristics and some methods to improve g-jitter environment are introduced from the front line of KIBO payload operations.

  12. Desert Research and Technology Studies (DRATS) 2010 Science Operations: Operational Approaches and Lessons Learned for Managing Science during Human Planetary Surface Missions

    Science.gov (United States)

    Eppler, Dean; Adams, Byron; Archer, Doug; Baiden, Greg; Brown, Adrian; Carey, William; Cohen, Barbara; Condit, Chris; Evans, Cindy; Fortezzo, Corey; hide

    2012-01-01

    Desert Research and Technology Studies (Desert RATS) is a multi-year series of hardware and operations tests carried out annually in the high desert of Arizona on the San Francisco Volcanic Field. These activities are designed to exercise planetary surface hardware and operations in conditions where long-distance, multi-day roving is achievable, and they allow NASA to evaluate different mission concepts and approaches in an environment less costly and more forgiving than space.The results from the RATS tests allows election of potential operational approaches to planetary surface exploration prior to making commitments to specific flight and mission hardware development. In previous RATS operations, the Science Support Room has operated largely in an advisory role, an approach that was driven by the need to provide a loose science mission framework that would underpin the engineering tests. However, the extensive nature of the traverse operations for 2010 expanded the role of the science operations and tested specific operational approaches. Science mission operations approaches from the Apollo and Mars-Phoenix missions were merged to become the baseline for this test. Six days of traverse operations were conducted during each week of the 2-week test, with three traverse days each week conducted with voice and data communications continuously available, and three traverse days conducted with only two 1-hour communications periods per day. Within this framework, the team evaluated integrated science operations management using real-time, tactical science operations to oversee daily crew activities, and strategic level evaluations of science data and daily traverse results during a post-traverse planning shift. During continuous communications, both tactical and strategic teams were employed. On days when communications were reduced to only two communications periods per day, only a strategic team was employed. The Science Operations Team found that, if

  13. Global polio eradication initiative: lessons learned and legacy.

    Science.gov (United States)

    Cochi, Stephen L; Freeman, Andrew; Guirguis, Sherine; Jafari, Hamid; Aylward, Bruce

    2014-11-01

    The world is on the verge of achieving global polio eradication. During >25 years of operations, the Global Polio Eradication Initiative (GPEI) has mobilized and trained millions of volunteers, social mobilizers, and health workers; accessed households untouched by other health initiatives; mapped and brought health interventions to chronically neglected and underserved communities; and established a standardized, real-time global surveillance and response capacity. It is important to document the lessons learned from polio eradication, especially because it is one of the largest ever global health initiatives. The health community has an obligation to ensure that these lessons and the knowledge generated are shared and contribute to real, sustained changes in our approach to global health. We have summarized what we believe are 10 leading lessons learned from the polio eradication initiative. We have the opportunity and obligation to build a better future by applying the lessons learned from GPEI and its infrastructure and unique functions to other global health priorities and initiatives. In so doing, we can extend the global public good gained by ending for all time one of the world's most devastating diseases by also ensuring that these investments provide public health dividends and benefits for years to come. Published by Oxford University Press on behalf of the Infectious Diseases Society of America 2014. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  14. Social Media and Seamless Learning: Lessons Learned

    Science.gov (United States)

    Panke, Stefanie; Kohls, Christian; Gaiser, Birgit

    2017-01-01

    The paper discusses best practice approaches and metrics for evaluation that support seamless learning with social media. We draw upon the theoretical frameworks of social learning theory, transfer learning (bricolage), and educational design patterns to elaborate upon different ideas for ways in which social media can support seamless learning.…

  15. The Value of Identifying and Recovering Lost GN&C Lessons Learned: Aeronautical, Spacecraft, and Launch Vehicle Examples

    Science.gov (United States)

    Dennehy, Cornelius J.; Labbe, Steve; Lebsock, Kenneth L.

    2010-01-01

    Within the broad aerospace community the importance of identifying, documenting and widely sharing lessons learned during system development, flight test, operational or research programs/projects is broadly acknowledged. Documenting and sharing lessons learned helps managers and engineers to minimize project risk and improve performance of their systems. Often significant lessons learned on a project fail to get captured even though they are well known 'tribal knowledge' amongst the project team members. The physical act of actually writing down and documenting these lessons learned for the next generation of NASA GN&C engineers fails to happen on some projects for various reasons. In this paper we will first review the importance of capturing lessons learned and then will discuss reasons why some lessons are not documented. A simple proven approach called 'Pause and Learn' will be highlighted as a proven low-impact method of organizational learning that could foster the timely capture of critical lessons learned. Lastly some examples of 'lost' GN&C lessons learned from the aeronautics, spacecraft and launch vehicle domains are briefly highlighted. In the context of this paper 'lost' refers to lessons that have not achieved broad visibility within the NASA-wide GN&C CoP because they are either undocumented, masked or poorly documented in the NASA Lessons Learned Information System (LLIS).

  16. Kick-off research coordination meeting of the IAEA coordinated research project on analyses of, and lessons learned from the operational experience with fast reactor equipment and systems. Working material

    International Nuclear Information System (INIS)

    2007-01-01

    The specific objectives of the IAEA Coordinated Research Project (CRP) on Analyses of, and Lessons Learned from the Operational Experience with Fast Reactor Equipment and Systems are to - Preserve the feedback from commissioning, operation, and decommissioning experience of experimental and power sodium cooled fast reactors; - Enable easy access to the information from this feedback; - Produce lessons-learned/synthesis reports from the commissioning, operation, and decommissioning of experimental and power sodium cooled fast reactors. To achieve these objectives, the CRP participants will retrieve, assess and archive all the documentation and information relevant to feedback from commissioning, operation, and decommissioning of sodium cooled fast reactors. The archiving step may include conversion of the documents in electronic form and the preparation of electronic databases organized along scientific/technical topics and reactors. Then, the CRP will work on the critical review, assessment, and systematization of the available data, and will publish synthesis reports, including the appropriate recommendations from the 'lessons learned'. It is important to stress that these generalization efforts are crucial in view of the generational change occurring now: preserving the knowledge and experience of the generation who participated in the initial development work of sodium cooled fast reactors and is now retiring, and ultimately ensuring the systematic use of the operational feedback in the form of a 'lessons learned' approach, is essential since it was in the early stage of the studies that the key decisions and design choices were made. To accomplish the lessons-learned and synthesising work requires for as many as possible of the highly skilled specialists and pioneers in the sodium cooled fast reactor research and development area to be actively involved in the CRP. Thus, the first stage of the CRP will address feedback from operational experience with regard to

  17. WHC significant lessons learned 1993--1995

    Energy Technology Data Exchange (ETDEWEB)

    Bickford, J.C.

    1997-12-12

    A lesson learned as defined in DOE-STD-7501-95, Development of DOE Lessons Learned Programs, is: A ``good work practice`` or innovative approach that is captured and shared to promote repeat applications or an adverse work practice or experience that is captured and shared to avoid a recurrence. The key word in both parts of this definition is ``shared``. This document was published to share a wide variety of recent Hanford experiences with other DOE sites. It also provides a valuable tool to be used in new employee and continuing training programs at Hanford facilities and at other DOE locations. This manual is divided into sections to facilitate extracting appropriate subject material when developing training modules. Many of the bulletins could be categorized into more than one section, however, so examination of other related sections is encouraged.

  18. CAT/RF Simulation Lessons Learned

    Science.gov (United States)

    2003-06-11

    IVSS-2003-MAS-7 CAT /RF Simulation Lessons Learned Christopher Mocnik Vetronics Technology Area, RDECOM TARDEC Tim Lee DCS Corporation...developed a re- configurable Unmanned Ground Vehicle (UGV) simulation for the Crew integration and Automation Test bed ( CAT ) and Robotics Follower (RF...Advanced Technology Demonstration (ATD) experiments. This simulation was developed as a component of the Embedded Simulation System (ESS) of the CAT

  19. Job Oriented Training ’Lessons Learned

    Science.gov (United States)

    2008-11-01

    Job Oriented Training ’Lessons Learned’ Job Oriented Training (JOT), een vorm van trainen waarbij de cursist zelfstandig, zonder theorie vooraf...39 77 lnfo-DenV@tno.nl TNO-rapportnummer TNO-DV 2008 A447 Opdrachtnummer Datum november 2008 Auteur (s) drs. H.E. Stubbe dr. A.H. van der...onderlinge discussie over achterliggende overwegingen te stimuleren. Zij hebben op dat moment nog geen theorie aangeboden gekregen en zijn niet op de hoogte

  20. Organizational safety factors research lessons learned

    International Nuclear Information System (INIS)

    Ryan, T.G.

    1995-01-01

    This Paper reports lessons learned and state of knowledge gained from an organizational factors research activity involving commercial nuclear power plants in the United States, through the end of 1991, as seen by the scientists immediately involved in the research. Lessons learned information was gathered from the research teams and individuals using a question and answer format. The following five questions were submitted to each team and individual: (1) What organizational factors appear to influence safety performance in some systematic way, (2) Should organizational factors research focus at the plant level, or should it extend beyond the plant level to the parent company, rate setting commissions, regulatory agencies, (3) How important is having direct access to plants for doing organizational factors research, (4) What lessons have been learned to date as the result of doing organizational factors research in a nuclear regulatory setting, and (5) What organizational research topics and issues should be pursued in the future? Conclusions based on the responses provided for this report are that organizational factors research can be conducted in a regulatory setting and produce useful results. Technologies pioneered in other academic, commercial, and military settings can be adopted for use in a nuclear regulatory setting. The future success of such research depends upon the cooperation of regulators, contractors, and the nuclear industry

  1. Research Data Curation Pilots: Lessons Learned

    Directory of Open Access Journals (Sweden)

    David Minor

    2014-07-01

    Full Text Available In the spring of 2011, the UC San Diego Research Cyberinfrastructure (RCI Implementation Team invited researchers and research teams to participate in a research curation and data management pilot program. This invitation took the form of a campus-wide solicitation. More than two dozen applications were received and, after due deliberation, the RCI Oversight Committee selected five curation-intensive projects. These projects were chosen based on a number of criteria, including how they represented campus research, varieties of topics, researcher engagement, and the various services required. The pilot process began in September 2011, and will be completed in early 2014. Extensive lessons learned from the pilots are being compiled and are being used in the on-going design and implementation of the permanent Research Data Curation Program in the UC San Diego Library. In this paper, we present specific implementation details of these various services, as well as lessons learned. The program focused on many aspects of contemporary scholarship, including data creation and storage, description and metadata creation, citation and publication, and long term preservation and access. Based on the lessons learned in our processes, the Research Data Curation Program will provide a suite of services from which campus users can pick and choose, as necessary. The program will provide support for the data management requirements from national funding agencies.

  2. Lessons learned from TMI-2

    International Nuclear Information System (INIS)

    Zeile, H.J.

    1981-01-01

    The major deficiencies which the industry set out to correct immediately occur in the following areas: operator training and qualification; improved plant status and control capability; independent evaluation of operations; emergency response; management structure support to safe reactor operation; adequate and timely technical support; and timely and accurate public information

  3. Lessons Learned from Developing SAWA: A Situation Awareness Assistant

    National Research Council Canada - National Science Library

    Matheus, Christopher J; Kokar, Mieczyslaw M; Letkowski, Jerzy J; Call, Catherine; Baclawski, Kenneth; Hinman, Michael; Salerno, John; Boulware, Douglas

    2005-01-01

    .... During the process of its development several lessons were learned about advantages and limitations of certain approaches, techniques and technologies as they are applied to situation awareness...

  4. Dynasting Theory: Lessons in learning grounded theory

    Directory of Open Access Journals (Sweden)

    Johnben Teik-Cheok Loy, MBA, MTS, Ph.D.

    2011-06-01

    Full Text Available This article captures the key learning lessons gleaned from the author’s experience learning and developing a grounded theory for his doctoral dissertation using the classic methodology as conceived by Barney Glaser. The theory was developed through data gathered on founders and successors of Malaysian Chinese family-own businesses. The main concern for Malaysian Chinese family businesses emerged as dynasting . the building, maintaining, and growing the power and resources of the business within the family lineage. The core category emerged as dynasting across cultures, where founders and successors struggle to transition from traditional Chinese to hybrid cultural and modernized forms of family business from one generation to the next. The key learning lessons were categorized under five headings: (a sorting through different versions of grounded theory, (b educating and managing research stakeholders, (c embracing experiential learning, (d discovering the core category: grounded intuition, and (e recognizing limitations and possibilities.Keywords: grounded theory, learning, dynasting, family business, Chinese

  5. EC6 safety enhancement - including impact of Fukushima lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Yu, S.; Zemdegs, R.; Boyle, S.; Soulard, M., E-mail: stephen.yu@candu.com [Candu Energy Inc., Mississauga, Ontario (Canada)

    2012-09-15

    The Enhanced CANDU 6 (EC6) is the new Generation III CANDU reactor design that meets the most up to date regulatory requirements and customer expectations. EC6 builds on the proven high performance design inch as the Qinshan CANDU 6 units and has made improvements to safety and operational performance, and has incorporated extensive operational feedback including Fukushima. The Fukushima Dai-ichi March 11, 2011 event has demonstrated the importance of defence-in-depth considerations for beyond-design basis events, including severe accidents. The EC6 design is based on the defence-in-depth principles and provides further design features that address the lessons learned from Fukushima. (author)

  6. A Jigsaw Lesson for Operations of Complex Numbers.

    Science.gov (United States)

    Lucas, Carol A.

    2000-01-01

    Explains the cooperative learning technique of jigsaw. Details the use of a jigsaw lesson for explaining complex numbers to intermediate algebra students. Includes copies of the handouts given to the expert groups. (Author/ASK)

  7. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  8. The Nez Perce Flight to Canada: An Analysis of the Nez Perce-US Cavalry Conflicts: Applying Historical Lessons Learned to Modern Counterinsurgency and Global War on Terrorism Operations

    National Research Council Canada - National Science Library

    Pfau, Scott E

    2006-01-01

    ... Cavalry pursuit of the Nez Perce. Many of the tactics, techniques, and procedures used by the modern day warriors often derive from lessons learned in early US military confrontations, such as the Nez Perce, and are applicable...

  9. SRMS History, Evolution and Lessons Learned

    Science.gov (United States)

    Jorgensen, Glenn; Bains, Elizabeth

    2011-01-01

    . Evolution of the simulations, guided by the Math Model Working Group, showed the utility of input from multiple modeling groups with a structured forum for discussion.There were many unique development challenges in the areas of hardware, software, certification, modeling and simulation. Over the years, upgrades and enhancements were implemented to increase the capability, performance and safety of the SRMS. The history and evolution of the SRMS program provided many lessons learned that can be used for future space robotic systems.

  10. Rock slopes and reservoirs - lessons learned

    International Nuclear Information System (INIS)

    Moore, D.P.

    1999-01-01

    Lessons learned about slope stability in the course of four decades of monitoring, and in some cases stabilizing, slopes along British Columbia's hydroelectric reservoirs are discussed. The lessons are illustrated by short case histories of some of the more important slopes such as Little Chief Slide, Dutchman's Ridge, Downie Slide, Checkerboard Creek and Wahleach. Information derived from the monitoring and other investigations are compared with early interpretations of geology and slope performance. The comparison serves as an indicator of progress in slope stability determination and as a measure of the value of accumulated experience in terms of the potential consequences to safety and cost savings over the long life-span of hydroelectric projects.14 refs., 2 tabs., 15 figs

  11. Stuxnet. Lessons learned?; Stuxnet. Lessons learned? Angriff auf die Leittechnik

    Energy Technology Data Exchange (ETDEWEB)

    Beirer, Stephan [GAI Netconsult GmbH, Berlin (Germany). Fach IT-Sicherheit in Prozesssteuerungsumgebungen

    2011-01-10

    Stuxnet, a malware developed to attack Siemens PCS7 process control systems has caused a stir in the last months. Further investigations revealed that this malware was targeted on a specific PCS7 control system installation and that all other other PCS7 systems are not threatened. It is, however, the question what long-term impacts for the information security of modern process control systems result from the Stuxnet worm and which security measures control system operators will have to implement after this incident. (orig.)

  12. Preservation and Implementation of Decommissioning Lessons Learned in the United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Rodriguez, Rafael L.

    2008-01-01

    Over the past several years, the United States Nuclear Regulatory Commission (NRC) has actively worked to capture and preserve lessons learned from the decommissioning of nuclear facilities. More recently, NRC has involved industry groups, the Organization of Agreement States (OAS), and the Department of Energy (DOE) in the effort to develop approaches to capture, preserve and disseminate decommissioning lessons learned. This paper discusses the accomplishments of the working group, some lessons learned by the NRC in the recent past, and how NRC will incorporate these lessons learned into its regulatory framework. This should help ensure that the design and operation of current and future nuclear facilities will result in less environmental impact and more efficient decommissioning. In summary, the NRC will continue capturing today's experience in decommissioning so that future facilities can take advantage of lessons learned from today's decommissioning projects. NRC, both individually and collectively with industry groups, OAS, and DOE, is aggressively working on the preservation and implementation of decommissioning lessons learned. The joint effort has helped to ensure the lessons from the whole spectrum of decommissioning facilities (i.e., reactor, fuel cycle, and material facilities) are better understood, thus maximizing the amount of knowledge and best practices obtained from decommissioning activities. Anticipated regulatory activities at the NRC will make sure that the knowledge gained from today's decommissioning projects is preserved and implemented to benefit the nuclear facilities that will decommission in the future

  13. Lessons-Learned from an Event during Overhaul

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jitae [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-05-15

    The event frequency, also including portion of human errors, has been decreasing compared to last ten years. However, events due to human errors during overhaul occur every year. From analyzed results for human-related events during overhaul, similar problems were identified. And organizational and safety cultural factors were also identified. On the other hand, another event during overhaul is analyzed and Lessons-Learned is drawn in an aspect of the operators' situation awareness. There was an event during overhaul and the analyzed results drawn Lessons-Learned in the aspect of the operators' situation awareness. From the analysis, several alarms and variation of plant parameters during overhaul can occur due to various maintenance works and tests. And in the aspect of the situation awareness, operators can miss, neglect, or not recognize the abnormal situation due to other maintenance activities occurring simultaneously. Therefore, countermeasures such as operator education or training, development of operator support systems, and further researches should be necessary to cope with these problems.

  14. Lessons-Learned from an Event during Overhaul

    International Nuclear Information System (INIS)

    Kim, Jitae

    2013-01-01

    The event frequency, also including portion of human errors, has been decreasing compared to last ten years. However, events due to human errors during overhaul occur every year. From analyzed results for human-related events during overhaul, similar problems were identified. And organizational and safety cultural factors were also identified. On the other hand, another event during overhaul is analyzed and Lessons-Learned is drawn in an aspect of the operators' situation awareness. There was an event during overhaul and the analyzed results drawn Lessons-Learned in the aspect of the operators' situation awareness. From the analysis, several alarms and variation of plant parameters during overhaul can occur due to various maintenance works and tests. And in the aspect of the situation awareness, operators can miss, neglect, or not recognize the abnormal situation due to other maintenance activities occurring simultaneously. Therefore, countermeasures such as operator education or training, development of operator support systems, and further researches should be necessary to cope with these problems

  15. Lessons Learned from the Node 1 Temperature and Humidity Control Subsystem Design

    Science.gov (United States)

    Williams, David E.

    2010-01-01

    Node 1 flew to the International Space Station (ISS) on Flight 2A during December 1998. To date the National Aeronautics and Space Administration (NASA) has learned a lot of lessons from this module based on its history of approximately two years of acceptance testing on the ground and currently its twelve years on-orbit. This paper will provide an overview of the ISS Environmental Control and Life Support (ECLS) design of the Node 1 Temperature and Humidity Control (THC) subsystem and it will document some of the lessons that have been learned to date for this subsystem and it will document some of the lessons that have been learned to date for these subsystems based on problems prelaunch, problems encountered on-orbit, and operational problems/concerns. It is hoped that documenting these lessons learned from ISS will help in preventing them in future Programs. 1

  16. GPON FTTH trial: lessons learned

    Science.gov (United States)

    Weis, Erik; Hölzl, Rainer; Breuer, Dirk; Lange, Christoph

    2009-11-01

    This paper reports on a FTTH field trial with GPON (Gigabit-capable passive optical network) technology in the network of Deutsche Telekom in the region of the cities of Berlin and Potsdam. Focus of this trial was to gain practical experience regarding GPON technology, fibre installation in existing ducts with micro duct technology, fibre cabling in customer buildings and impact on operational processes. Furthermore it is reported on an initial Deutsche Telekom FTTB deployment based on GPON technology in the city of Dresden with the main targets to obtain practical deployment and operation experiences with fibre-based access networks and to provide broadband access to a part of the city formerly not servable by DSL (digital subscriber line) technology.

  17. Lessons learned from AU PSO-missions in Africa

    DEFF Research Database (Denmark)

    Mandrup, Thomas

    The paper deals with the lessons learned from AU's PSO since 2002, and what that entails for the design of future PSO.......The paper deals with the lessons learned from AU's PSO since 2002, and what that entails for the design of future PSO....

  18. Lessons learned from MONJU sodium leak accident

    International Nuclear Information System (INIS)

    Nakai, Ryodai; Ito, Kazumoto; Nagata, Takashi

    2000-01-01

    MONJU sodium leak accident was a small accident with a large public impact. There was no injures or exposure to radiation, nor was there any loss of safety function such as reactor shutdown or reactor cooling. On the contrary a social impact is considerably large, whereby the plant remains shutdown. This paper describes the lessons learned from the accident, i.e. the impact of the accident and its cause, and the features on risk management in view of social aspect as well as technical aspect. (author)

  19. The Fernald Closure Project: Lessons Learned

    International Nuclear Information System (INIS)

    Murphy, Cornelius M.; Carr, Dennis

    2008-01-01

    For nearly 37 years, the U.S. Department of Energy site at Fernald - near Cincinnati, Ohio - produced 230,000 metric tons (250,000 short tons) of high-purity, low-enriched uranium for the U.S. Defense Program, generating more than 5.4 million metric tons (6 million short tons) of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion mega environmental-remediation project that was completed in October 2006. Project evolved through four phases: - Conducting remedial-investigation studies to determine the extent of damage to the environment and groundwater at, and adjacent to, the production facilities; - Selecting cleanup criteria - final end states that had to be met that protect human health and the environment; - Selecting and implementing the remedial actions to meet the cleanup goals; - Executing the work in a safe, compliant and cost-effective manner. In the early stages of the project, there were strained relationships - in fact total distrust - between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholders groups in the decision-making process, the DOE and Fluor developed a public-participation strategy to open the channels of communication with the various parties: site leadership, technical staff and regulators. This approach proved invaluable to the success of the project, which has become a model for future environmental remediation projects. This paper will summarize the history and shares lessons learned: the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies achieved. Lessons learned fall into ten categories: - Regulatory approach with end

  20. Koeberg - Performance and lessons learned

    International Nuclear Information System (INIS)

    Oaten, B.E.

    1990-01-01

    The paper gives a summary of Plant Performance since build in terms of broad indicators such as total energy, availability, total radiation doses and radioactive waste generation. Success in nuclear and conventional safety, radwaste management, chemical management and special projects are highlighted. The difficulties and achievements in training staff for an isolated nuclear facility are discussed. Some systems have had redundancy improved through the inclusion of optional plant and the benefit of two such options is indicated. Operating regimes that improve fuel utilization are described and progress in occurrence reporting is shown. The success of community relations and conservation programmes are outlined. (author)

  1. Koeberg - Performance and lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Oaten, B E [Koeberg Nuclear Power Station, Melkbosstrand (South Africa)

    1990-06-01

    The paper gives a summary of Plant Performance since build in terms of broad indicators such as total energy, availability, total radiation doses and radioactive waste generation. Success in nuclear and conventional safety, radwaste management, chemical management and special projects are highlighted. The difficulties and achievements in training staff for an isolated nuclear facility are discussed. Some systems have had redundancy improved through the inclusion of optional plant and the benefit of two such options is indicated. Operating regimes that improve fuel utilization are described and progress in occurrence reporting is shown. The success of community relations and conservation programmes are outlined. (author)

  2. Space Operations Learning Center

    Science.gov (United States)

    Lui, Ben; Milner, Barbara; Binebrink, Dan; Kuok, Heng

    2012-01-01

    The Space Operations Learning Center (SOLC) is a tool that provides an online learning environment where students can learn science, technology, engineering, and mathematics (STEM) through a series of training modules. SOLC is also an effective media for NASA to showcase its contributions to the general public. SOLC is a Web-based environment with a learning platform for students to understand STEM through interactive modules in various engineering topics. SOLC is unique in its approach to develop learning materials to teach schoolaged students the basic concepts of space operations. SOLC utilizes the latest Web and software technologies to present this educational content in a fun and engaging way for all grade levels. SOLC uses animations, streaming video, cartoon characters, audio narration, interactive games and more to deliver educational concepts. The Web portal organizes all of these training modules in an easily accessible way for visitors worldwide. SOLC provides multiple training modules on various topics. At the time of this reporting, seven modules have been developed: Space Communication, Flight Dynamics, Information Processing, Mission Operations, Kids Zone 1, Kids Zone 2, and Save The Forest. For the first four modules, each contains three components: Flight Training, Flight License, and Fly It! Kids Zone 1 and 2 include a number of educational videos and games designed specifically for grades K-6. Save The Forest is a space operations mission with four simulations and activities to complete, optimized for new touch screen technology. The Kids Zone 1 module has recently been ported to Facebook to attract wider audience.

  3. Lessons learned from the decommissioning of NORM facility in Malaysia

    International Nuclear Information System (INIS)

    Kontol, Khairuddin M.; Omar, Muhamat; Ahmad, Syed H.S.S.

    2008-01-01

    Full text: Malaysia Decommissioning of Naturally Occurring Radioactive Materials (NORM) facility in Malaysia will run into unforeseeable complications and difficulties if there is no proper planning. The Atomic Energy Licensing Board (AELB) plays important role in guiding and assisting the operator/contractor in this NORM decommissioning project. A local Naturally Occurring Radioactive Materials (NORM) processing plant located in the northern region of peninsular Malaysia had ceased its operations and decided to decommission and remediate its site for the final release of the site. The remediated site is earmarked as an industrial site. During its operations, monazites are processed for rare earth elements such as cerium and lanthanum. It's plant capable of processing monazite to produce rare earth chloride and rare earth carbonate. The main by-product of monazite processing is the radioactive cake containing primarily thorium hydroxide. Operation of the monazite processing plant started in early eighties and terminated in early nineties. The decommissioning of the plant site started in late 2003 and completed its decommissioning and remediation works in early 2006. This paper described the lesson learned by Malaysian Nuclear Agency (Nuclear Malaysia) in conducting third party independent audit for the decommissioning of the NORM contaminated facility. By continuously reviewing the lessons learned, mistakes and/or inefficiencies in this plant decommissioning project, hopefully will result in a smoother, less costly and more productive future decommissioning works on NORM facilities in Malaysia. (author)

  4. System 80+{trademark} standard design incorporates radiation protection lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Crom, T.D.; Naugle, C.L. [Duke Engineering & Services, Inc., Charlotte, NC (United States); Turk, R.S. [ABB Combustion Engineering Nuclear Power, Windsor, CT (United States)

    1995-03-01

    Many lessons have been learned from the current generation of nuclear plants in the area of radiation protection. The following paper will outline how the lessons learned have been incorporated into the design and operational philosophy of the System 80+{trademark} Standard Design currently under development by ABB Combustion Engineering (ABB-CE) with support from Duke Engineering and Services, Inc. and Stone and Webster Engineering Corporation in the Balance-of-Plant design. The System 80+{trademark} Standard Design is a complete nuclear power plant for national and international markets, designed in direct response to utility needs for the 1990`s, and scheduled for Nuclear Regulatory Commission (NRC) Design Certification under the new standardization rule (10 CFR Part 52). System 80+{trademark} is a natural extension of System 80{sup R} technology, an evolutionary change based on proven Nuclear Steam Supply System (NSSS) in operation at Palo Verde in Arizona and under construction at Yonggwang in the Republic of Korea. The System 80+{trademark} Containment and much of the Balance of Plant design is based upon Duke Power Company`s Cherokee Plant, which was partially constructed in the late 1970`s, but, was later canceled (due to rapid declined in electrical load growth). The System 80+{trademark} Standard Design meets the requirements given in the Electric Power Research Institute (EPRI) Advanced Light Water Reactor (ALWR) Requirements Document. One of these requirements is to limit the occupational exposure to 100 person-rem/yr. This paper illustrates how this goal can be achieved through the incorporation of lessons learned, innovative design, and the implementation of a common sense approach to operation and maintenances practices.

  5. Lessons Learned from Environmental Remediation Programmes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-03-15

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  6. Lessons Learned from Environmental Remediation Programmes

    International Nuclear Information System (INIS)

    2014-01-01

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  7. Space reactor safety, 1985--1995 lessons learned

    International Nuclear Information System (INIS)

    Marshall, A.C.

    1995-01-01

    Space reactor safety activities and decisions have evolved over the last decade. Important safety decisions have been made in the SP-100, Space Exploration Initiative, NEPSTP, SNTP, and Bimodal Space Reactor programs. In addition, international guidance on space reactor safety has been instituted. Space reactor safety decisions and practices have developed in the areas of inadvertent criticality, reentry, radiological release, orbital operation, programmatic, and policy. In general, the lessons learned point out the importance of carefully reviewing previous safety practices for appropriateness to space nuclear programs in general and to the specific mission under consideration

  8. Space reactor safety, 1985--1995 lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Marshall, A.C.

    1995-12-31

    Space reactor safety activities and decisions have evolved over the last decade. Important safety decisions have been made in the SP-100, Space Exploration Initiative, NEPSTP, SNTP, and Bimodal Space Reactor programs. In addition, international guidance on space reactor safety has been instituted. Space reactor safety decisions and practices have developed in the areas of inadvertent criticality, reentry, radiological release, orbital operation, programmatic, and policy. In general, the lessons learned point out the importance of carefully reviewing previous safety practices for appropriateness to space nuclear programs in general and to the specific mission under consideration.

  9. Microplastics: addressing ecological risk through lessons learned.

    Science.gov (United States)

    Syberg, Kristian; Khan, Farhan R; Selck, Henriette; Palmqvist, Annemette; Banta, Gary T; Daley, Jennifer; Sano, Larissa; Duhaime, Melissa B

    2015-05-01

    Plastic litter is an environmental problem of great concern. Despite the magnitude of the plastic pollution in our water bodies, only limited scientific understanding is available about the risk to the environment, particularly for microplastics. The apparent magnitude of the problem calls for quickly developing sound scientific guidance on the ecological risks of microplastics. The authors suggest that future research into microplastics risks should be guided by lessons learned from the more advanced and better understood areas of (eco) toxicology of engineered nanoparticles and mixture toxicity. Relevant examples of advances in these two fields are provided to help accelerate the scientific learning curve within the relatively unexplored area of microplastics risk assessment. Finally, the authors advocate an expansion of the "vector effect" hypothesis with regard to microplastics risk to help focus research of microplastics environmental risk at different levels of biological and environmental organization. © 2015 SETAC.

  10. Lessons learned from accidents in radiotherapy

    International Nuclear Information System (INIS)

    Ortiz-Lopez, P.; Haywood, J.

    1996-01-01

    Radiotherapy is the only application of radiation which intentionally delivers very high doses to humans. A gross deviation from the prescribed dose or dose distribution can have severe, or even fatal consequences. Since the patient is placed directly in the beam or sources are inserted in the body, any mistake made with the beam or the sources leads almost certainly to an accidental exposure. Lessons learned from previous incidents can be used to test the vulnerability of a given facility, provided that these are adequately disseminated. The purpose of this paper is to present a summary of the lessons learned from a relatively large sample of events. The analysis has been presented as a short description followed by an identification of the triggering event and the contributing factors. These have been grouped as follows: errors in commissioning or calibration machines and sources affecting many patients; mistakes affecting individual patients such as irradiating the wrong patient, the wrong, field or site, and mistakes when entering data into or reading from the patient's chart; error due to unusual treatments or situations; equipment failure and human machine problems, including maintenance. (author). 1 ref

  11. Lessons learned from accidents in radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Ortiz-Lopez, P [International Atomic Energy Agency, Vienna (Austria). Div. of Nuclear Safety; Novotny, J [University Hospital St. Rafael, Leuven (Belgium); Haywood, J [South Cleveland Hospital (United Kingdom). Cleveland Medical Physics Unit

    1996-08-01

    Radiotherapy is the only application of radiation which intentionally delivers very high doses to humans. A gross deviation from the prescribed dose or dose distribution can have severe, or even fatal consequences. Since the patient is placed directly in the beam or sources are inserted in the body, any mistake made with the beam or the sources leads almost certainly to an accidental exposure. Lessons learned from previous incidents can be used to test the vulnerability of a given facility, provided that these are adequately disseminated. The purpose of this paper is to present a summary of the lessons learned from a relatively large sample of events. The analysis has been presented as a short description followed by an identification of the triggering event and the contributing factors. These have been grouped as follows: errors in commissioning or calibration machines and sources affecting many patients; mistakes affecting individual patients such as irradiating the wrong patient, the wrong, field or site, and mistakes when entering data into or reading from the patient`s chart; error due to unusual treatments or situations; equipment failure and human machine problems, including maintenance. (author). 1 ref.

  12. Lessons learned from women in leadership positions.

    Science.gov (United States)

    Elias, Eileen

    2018-01-01

    Eileen Elias has decades of experience in leadership positions within government and nongovernmental organizations. As the first female Commissioner for Mental Health in the Commonwealth of Massachusetts and the US in the early 1990s, Elias gained experience on navigating gender-based challenges to attain recognized performance outcomes. From lessons learned from women leaders, educate young women entering their careers on attaining leadership positions. Comprehensive research of literature from 2012 through 2017 and interviews with women leaders representing non-Fortune 500 companies including academia, research, non-profit, for-profit, and primary and secondary education. Interviewees included:1.Gail Bassin, Co-Chief Executive Officer and Treasurer, JBS International Inc.2.Jeri Epstein, Executive Director, The Ambit Foundation3.Valerie Fletcher, Executive Director, Institute for Human Centered Design4.Christine James-Brown, President and CEO, Child Welfare League of America5.Daria Mochly-Rosen, PhD, Professor and Fellow, Chemical and Systems Biology, Stanford University School of Medicine6.Eileen O'Keefe, MD, MPH, Clinical Associate Professor and Director, Boston University Health Sciences7.Jeri Shaw, President and Co-Chief Executive Officer, JBS International Inc. A comprehensive understanding of key women leaders' lessons learned and recommendations targeting young women as they assess leadership opportunities in the public or private sectors.

  13. Lessons Learned in Software Testing A Context-Driven Approach

    CERN Document Server

    Kaner, Cem; Pettichord, Bret

    2008-01-01

    Decades of software testing experience condensed into the most important lessons learned.The world's leading software testing experts lend you their wisdom and years of experience to help you avoid the most common mistakes in testing software. Each lesson is an assertion related to software testing, followed by an explanation or example that shows you the how, when, and why of the testing lesson. More than just tips, tricks, and pitfalls to avoid, Lessons Learned in Software Testing speeds you through the critical testing phase of the software development project without the extensive trial an

  14. Nuclear Instrumentation and Control Cyber Testbed Considerations – Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Jonathan Gray; Robert Anderson; Julio G. Rodriguez; Cheol-Kwon Lee

    2014-08-01

    Abstract: Identifying and understanding digital instrumentation and control (I&C) cyber vulnerabilities within nuclear power plants and other nuclear facilities, is critical if nation states desire to operate nuclear facilities safely, reliably, and securely. In order to demonstrate objective evidence that cyber vulnerabilities have been adequately identified and mitigated, a testbed representing a facility’s critical nuclear equipment must be replicated. Idaho National Laboratory (INL) has built and operated similar testbeds for common critical infrastructure I&C for over ten years. This experience developing, operating, and maintaining an I&C testbed in support of research identifying cyber vulnerabilities has led the Korean Atomic Energy Research Institute of the Republic of Korea to solicit the experiences of INL to help mitigate problems early in the design, development, operation, and maintenance of a similar testbed. The following information will discuss I&C testbed lessons learned and the impact of these experiences to KAERI.

  15. Nuclear Instrumentation and Control Cyber Testbed Considerations - Lessons Learned

    International Nuclear Information System (INIS)

    Jonathan, Peter Grey; Robert, S Anderson; Julio, G Rodriguez; Lee, Cheol Kwon

    2014-01-01

    Identifying and understanding digital instrumentation and control (I and C) cyber vulnerabilities within nuclear power plants and other nuclear facilities is critical if nation states desire to operate nuclear facilities safely, reliably, and securely. To demonstrate objective evidence that cyber vulnerabilities have been adequately identified and mitigated, a test bed representing a facility's critical nuclear equipment must be replicated. Idaho National Laboratory (INL) has built and operated similar test beds for common critical infrastructure I and C for over 10 years. This experience developing, operating, and maintaining an I and C test bed in support of research identifying cyber vulnerabilities has led the Korean Atomic Energy Research Institute of the Republic of Korea to solicit the experiences of INL to help mitigate problems early in the design, development, operation, and maintenance of a similar test bed. The following information will discuss I and C test bed lessons learned and the impact of these experiences to KAERI

  16. Lessons Learned In Aerosol Monitoring With The RASA

    International Nuclear Information System (INIS)

    Forrester, Joel B.; Bowyer, Ted W.; Carty, Fitz; Comes, Laura; Eslinger, Paul W.; Greenwood, Lawrence R.; Haas, Derek A.; Hayes, James C.; Kirkham, Randy R.; Lepel, Elwood A.; Litke, Kevin E.; Miley, Harry S.; Morris, Scott J.; Schrom, Brian T.; Van Davelaar, Peter; Woods, Vincent T.

    2011-01-01

    The Radionuclide Aerosol Sampler/Analyzer (RASA) is an automated aerosol collection and analysis system designed by Pacific Northwest National Laboratory (PNNL) in the 1990's and is deployed in several locations around the world as part of the International Monitoring System (IMS) required under the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The RASA operates unattended, save for regularly scheduled maintenance, iterating samples through a three-step process on a 24-hour interval. In its 15-year history, much has been learned from the operation and maintenance of the RASA that can benefit engineering updates or future aerosol systems. On 11 March 2011, a 9.0 magnitude earthquake and tsunami rocked the eastern coast of Japan, resulting in power loss and cooling failures at the Daiichi nuclear power plants in Fukushima Prefecture. Aerosol collections were conducted with the RASA in Richland, WA. We present a summary of the lessons learned over the history of the RASA, including lessons taken from the Fukushima incident, regarding the RASA IMS stations operated by the United States.

  17. Defining a risk-informed framework for whole-of-government lessons learned: A Canadian perspective.

    Science.gov (United States)

    Friesen, Shaye K; Kelsey, Shelley; Legere, J A Jim

    Lessons learned play an important role in emergency management (EM) and organizational agility. Virtually all aspects of EM can derive benefit from a lessons learned program. From major security events to exercises, exploiting and applying lessons learned and "best practices" is critical to organizational resilience and adaptiveness. A robust lessons learned process and methodology provides an evidence base with which to inform decisions, guide plans, strengthen mitigation strategies, and assist in developing tools for operations. The Canadian Safety and Security Program recently supported a project to define a comprehensive framework that would allow public safety and security partners to regularly share event response best practices, and prioritize recommendations originating from after action reviews. This framework consists of several inter-locking elements: a comprehensive literature review/environmental scan of international programs; a survey to collect data from end users and management; the development of a taxonomy for organizing and structuring information; a risk-informed methodology for selecting, prioritizing, and following through on recommendations; and standardized templates and tools for tracking recommendations and ensuring implementation. This article discusses the efforts of the project team, which provided "best practice" advice and analytical support to ensure that a systematic approach to lessons learned was taken by the federal community to improve prevention, preparedness, and response activities. It posits an approach by which one might design a systematic process for information sharing and event response coordination-an approach that will assist federal departments to institutionalize a cross-government lessons learned program.

  18. Driver. D530.2 – Tools for the Lessons Learned Framework

    NARCIS (Netherlands)

    Schaik, M.G. van; et al

    2016-01-01

    In this deliverable D530.2 “Tools for the Lessons Learned Framework” the overall lessons learned framework will be clarified based on the delivery D53.1 “Lessons Learned Framework Concept” and aligned with the deliverable D52.1 “Harmonized competence framework”. The Tools for the Lessons Learned

  19. Lessons Learned from the Puerto Rico Battery Energy Storage System

    Energy Technology Data Exchange (ETDEWEB)

    BOYES, JOHN D.; DE ANA, MINDI FARBER; TORRES, WENCESLANO

    1999-09-01

    The Puerto Rico Electric Power Authority (PREPA) installed a distributed battery energy storage system in 1994 at a substation near San Juan, Puerto Rico. It was patterned after two other large energy storage systems operated by electric utilities in California and Germany. The U.S. Department of Energy (DOE) Energy Storage Systems Program at Sandia National Laboratories has followed the progress of all stages of the project since its inception. It directly supported the critical battery room cooling system design by conducting laboratory thermal testing of a scale model of the battery under simulated operating conditions. The Puerto Rico facility is at present the largest operating battery storage system in the world and is successfully providing frequency control, voltage regulation, and spinning reserve to the Caribbean island. The system further proved its usefulness to the PREPA network in the fall of 1998 in the aftermath of Hurricane Georges. The owner-operator, PREPA, and the architect/engineer, vendors, and contractors learned many valuable lessons during all phases of project development and operation. In documenting these lessons, this report will help PREPA and other utilities in planning to build large energy storage systems.

  20. Lessons learned on stakeholder issues in decommissioning

    International Nuclear Information System (INIS)

    O'Sullivan, P.; Pescatore, C.

    2008-01-01

    Issues of public concern during decommissioning and dismantling (D and D) are partly the same and partly different from those of the preceding phases (planning, construction and operation). While in the course of construction and operation the main challenges include meeting expectations of a higher quality of life, accommodating a growing population, mitigating construction nuisances, and assuring the safe operation of the facility, the main concerns in the D and D phase are decreasing employment rate, the eventual reduction of revenues for the municipality, the future use of the affected land and negative social impacts (e.g., out-migration). The decommissioning phase is characterised by heterogeneity of stakeholder interests and values, difficulties of reaching consensus or compromise, and difficulties in connection with the harmonization of energy production, environmental protection and sustainable socio-economic development considerations. Typically, there might also be tensions between local and regional decisions. As in other phases, the building of trust between stakeholder is crucial from the point of view of conflict management, and social lessons learnt from the siting and developments of nuclear facilities are widely applicable in the field of D and D as well. A review is presented of major lessons to be learnt from NEA activities in the field of decommissioning and stakeholder involvement. (author)

  1. Lessons learned on stakeholder issues in decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    O' Sullivan, P.; Pescatore, C. [OECD Nuclear Energy Agency, 92 - Issy les Moulineaux (France)

    2008-07-01

    Issues of public concern during decommissioning and dismantling (D and D) are partly the same and partly different from those of the preceding phases (planning, construction and operation). While in the course of construction and operation the main challenges include meeting expectations of a higher quality of life, accommodating a growing population, mitigating construction nuisances, and assuring the safe operation of the facility, the main concerns in the D and D phase are decreasing employment rate, the eventual reduction of revenues for the municipality, the future use of the affected land and negative social impacts (e.g., out-migration). The decommissioning phase is characterised by heterogeneity of stakeholder interests and values, difficulties of reaching consensus or compromise, and difficulties in connection with the harmonization of energy production, environmental protection and sustainable socio-economic development considerations. Typically, there might also be tensions between local and regional decisions. As in other phases, the building of trust between stakeholder is crucial from the point of view of conflict management, and social lessons learnt from the siting and developments of nuclear facilities are widely applicable in the field of D and D as well. A review is presented of major lessons to be learnt from NEA activities in the field of decommissioning and stakeholder involvement. (author)

  2. 241-SY-101 air lance removal lessons learned

    International Nuclear Information System (INIS)

    Moore, T.L.; Titzler, P.A.

    1994-01-01

    An emergency task was undertaken to remove four air lances and one thermocouple (TC) tree from tank 241-SY-101 (SY-101). This resulted from video observation that these pipes were being severely bent during periodic gas release events that regularly occurred every three to four months. At the time, the gas release events were considered to be the number one safety issue within the US Department of Energy (DOE) complex. This emergency removal task was undertaken on an extremely short schedule that required all activities possible to be completed in parallel. This approach and extremely short schedule, while successful, resulted in some undesirable consequences from less than desired time for design, reviews, equipment testing, operations training, and bad weather conditions. These consequences included leakage of liquid waste from the containers to the ground, higher than expected dose rates at the container surface, difficult field operations, and unexpected pipe configuration during removal. In addition, changes to environmental regulations and severe winter weather impacted the packaging and shipping activities required the prepare the removed pipes for storage at the Central Waste Complex (CWC). The purpose of this document is to identify lessons to be learned for future activities. In context of the emergency conditions that existed at the time and the urgency to remove these pipes, their removal was successfully completed under extremely difficult conditions and schedule. The success of the task should not be overshadowed by the desire to identify areas needing improvement and lessons to be learned. Many of the lessons identified in this document have already resulted in improved conduct of operations and engineering

  3. Mobile Learning vs. Traditional Classroom Lessons: A Comparative Study

    Science.gov (United States)

    Furió, D.; Juan, M.-C.; Seguí, I.; Vivó, R.

    2015-01-01

    Different methods can be used for learning, and they can be compared in several aspects, especially those related to learning outcomes. In this paper, we present a study in order to compare the learning effectiveness and satisfaction of children using an iPhone game for learning the water cycle vs. the traditional classroom lesson. The iPhone game…

  4. Social support and child protection: Lessons learned and learning.

    Science.gov (United States)

    Thompson, Ross A

    2015-03-01

    Social support has been a topic of research for nearly 50 years, and its applications to prevention and intervention have grown significantly, including programs advancing child protection. This article summarizes the central conclusions of the 1994 review of research on social support and the prevention of child maltreatment prepared for the U.S. Advisory Board on Child Abuse and Neglect, and surveys advances in the field since its publication. Among the lessons learned twenty years ago are (a) the diversity of the social support needs of at-risk families and their association with child endangerment, (b) the need to supplement the emotionally affirmative aspects of social support with efforts to socialize parenting practices and monitor child well-being, (c) the desirability of integrating formal and informal sources of social support for recipients, and (d) the importance of considering the complex recipient reactions to receiving support from others. The lessons we are now learning derive from research exploring the potential of online communication to enhance social support, the neurobiology of stress and its buffering through social support, and the lessons of evaluation research that are identifying the effective ingredients of social support interventions. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. 10 lessons learned by a misguided physician.

    Science.gov (United States)

    Levin, Barry E

    2017-07-01

    It was a great and humbling honor to receive the 2016 Distinguished Career Award from my SSIB colleagues. This paper summarizes the major points of my DCA talk at the 2016 annual meeting. It is a reflection on my 50year medical and research career and 10 lessons I have learned over those years which might be of help to young investigators near the beginning of their own research careers. These lessons include: the value of being receptive to the opportunities provided you; how clinician-scientists can serve as critical role models for young investigators like me and a history of how my career developed as a result of their influence; the importance of carefully examining your own data, particularly when it doesn't agree with your preconceived ideas; the critical role that students, postdocs and PhD (and even veterinarian) colleagues can play in developing one's career; the likelihood that your career path will have many interesting twists and turns determined by changes in your own scientific interests and how rewarding various areas of research focus are to you; the importance of building a close-knit laboratory staff family; the fact that science and romance can mix. Finally, I offer 3 somewhat self-evident free pieces of advice for building and maintaining a rewarding career. Copyright © 2016 Elsevier Inc. All rights reserved.

  6. PUREX/UO{sub 3} facilities deactivation lessons learned history

    Energy Technology Data Exchange (ETDEWEB)

    Hamrick, D.G.; Gerber, M.S.

    1995-01-01

    The Plutonium-Uranium Extraction (PUREX) Facility operated from 1956-1972, from 1983-1988, and briefly during 1989-1990 to produce for national defense at the Hanford Site in Washington State. The Uranium Trioxide (UO{sub 3}) Facility operated at the Hanford Site from 1952-1972, 1984-1988, and briefly in 1993. Both plants were ordered to permanent shutdown by the U.S. Department of Energy (DOE) in December 1992, thus initiating their deactivation phase. Deactivation is that portion of a facility`s life cycle that occurs between operations and final decontamination and decommissioning (D&D). This document details the history of events, and the lessons learned, from the time of the PUREX Stabilization Campaign in 1989-1990, through the end of the first full fiscal year (FY) of the deactivation project (September 30, 1994).

  7. Controlling changes - lessons learned from waste management facilities

    International Nuclear Information System (INIS)

    Johnson, B.M.; Koplow, A.S.; Stoll, F.E.; Waetje, W.D.

    1995-01-01

    This paper discusses lessons learned about change control at the Waste Reduction Operations Complex (WROC) and Waste Experimental Reduction Facility (WERF) of the Idaho National Engineering Laboratory (INEL). WROC and WERF have developed and implemented change control and an as-built drawing process and have identified structures, systems, and components (SSCS) for configuration management. The operations have also formed an Independent Review Committee to minimize costs and resources associated with changing documents. WROC and WERF perform waste management activities at the INEL. WROC activities include storage, treatment, and disposal of hazardous and mixed waste. WERF provides volume reduction of solid low-level waste through compaction, incineration, and sizing operations. WROC and WERF's efforts aim to improve change control processes that have worked inefficiently in the past

  8. Lessons learned form high-flux isotope reactor restart efforts

    International Nuclear Information System (INIS)

    Dahl, T.L.

    1989-01-01

    When the high-flux isotope reactor's (HFIR's) pressure vessel irradiation surveillance specimens were examined in December 1986, unexpected embrittlement was found. The resulting investigation disclosed widespread deficiencies in quality assurance and management practices. On March 24, 1987, the US Department of Energy (DOE) mandated a shutdown of all five Oak Ridge National Laboratory (ORNL) research reactors. Since the beginning of 1987, 18 different formal review groups have evaluated the management and operations of the HFIR. The root cause of the identified deficiencies in the HFIR program was defined as a lack of rigor in management practices and complacency built on twenty years of trouble-free operation. A number of lessons can be learned from the HFIR experience. Particular insight can be gained by comparing the HFIR organization prior to the shutdown with the organization that exists today. Key elements in such a comparison include staffing, funding, discipline, and formality in operations, maintenance, and management

  9. Lessons Learned from the Puerto Rico Battery Energy Storage System

    Energy Technology Data Exchange (ETDEWEB)

    Boyes, John D.; De Anda, Mindi Farber; Torres, Wenceslao

    1999-08-11

    The Puerto Rico Electric Power Authority (PREPA) installed a battery energy storage system in 1994 at a substation near San Juan, Puerto Rico. It was patterned after two other large energy storage systems operated by electric utilities in California and Germany. The Puerto Rico facility is presently the largest operating battery storage system in the world and has successfully provided frequency control, voltage regulation, and spinning reseme to the Caribbean island. The system further proved its usefulness to the PREPA network in the fall of 1998 in the aftermath of Hurricane Georges. However, the facility has suffered accelerated cell failures in the past year and PREPA is committed to restoring the plant to full capacity. This represents the first repowering of a large utility battery facility. PREPA and its vendors and contractors learned many valuable lessons during all phases of project development and operation, which are summarized in this paper.

  10. PUREX/UO3 facilities deactivation lessons learned history

    International Nuclear Information System (INIS)

    Hamrick, D.G.; Gerber, M.S.

    1995-01-01

    The Plutonium-Uranium Extraction (PUREX) Facility operated from 1956-1972, from 1983-1988, and briefly during 1989-1990 to produce for national defense at the Hanford Site in Washington State. The Uranium Trioxide (UO 3 ) Facility operated at the Hanford Site from 1952-1972, 1984-1988, and briefly in 1993. Both plants were ordered to permanent shutdown by the U.S. Department of Energy (DOE) in December 1992, thus initiating their deactivation phase. Deactivation is that portion of a facility's life cycle that occurs between operations and final decontamination and decommissioning (D ampersand D). This document details the history of events, and the lessons learned, from the time of the PUREX Stabilization Campaign in 1989-1990, through the end of the first full fiscal year (FY) of the deactivation project (September 30, 1994)

  11. Bruce A restart (execution and lessons-learned)

    International Nuclear Information System (INIS)

    Soini, J.

    2011-01-01

    Lessons learned with the Bruce Units 3 and 4 restart have been incorporated into the current refurbishment of Units 1 and 2. In addition, lessons learned on the lead unit (U2) are aggressively applied on the lagging unit (U1) to maximize efficiency and productivity. There will be a discussion on how this internal OPEX, along with external lessons learned, are used to continuously improve all aspects of the Bruce A Restart project management cycle, from scope selection, through planning and scheduling, to execution.

  12. Considerations for implementing an organizational lessons learned process.

    Energy Technology Data Exchange (ETDEWEB)

    Fosshage, Erik D

    2013-05-01

    This report examines the lessons learned process by a review of the literature in a variety of disciplines, and is intended as a guidepost for organizations that are considering the implementation of their own closed-loop learning process. Lessons learned definitions are provided within the broader context of knowledge management and the framework of a learning organization. Shortcomings of existing practices are summarized in an attempt to identify common pitfalls that can be avoided by organizations with fledgling experiences of their own. Lessons learned are then examined through a dual construct of both process and mechanism, with emphasis on integrating into organizational processes and promoting lesson reuse through data attributes that contribute toward changed behaviors. The report concludes with recommended steps for follow-on efforts.

  13. Lessons learned at Lower East Fork Poplar Creek, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burch, K.L.; Page, D.G.

    1996-01-01

    The US Department of Energy (DOE) used several innovative strategies and technologies in conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) activities for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. These innovations helped to cost-effectively characterize the 270-ha (670-acre), 23.3-km (14.5-mile) floodplain and to obtain a 400-parts per million (ppm) cleanup level for mercury in soil. Lessons learned during the project involve management, investigation, and risk assessment strategies and techniques. Management lessons learned include (a) how to handle the large OU, (b) how to effectively involve the community in decisions, and (c) how to select a remedy that incorporates the needs of many involved agencies. Investigation lessons learned include (a) how to design an effective sampling strategy for the site, (b) how to cost-effectively analyze a large number of samples, and (c) which of several treatment technologies is best-suited to the site. Risk assessment lessons learned include (a) how to determine an appropriate cleanup level for human health and the environment, (b) how to quantify uncertainty in the human health risk assessment, (c) how to reconcile different solubilities of different mercury species, and (d) how to best conduct the ecological risk assessment. Other CERCLA sites can benefit from lessons learned during this project whether still in the investigative stage or further along in the process. Applying these lessons can substantially reduce costs and make more efficient use of Superfund resources

  14. Pedagogy and second language learning: Lessons learned from Intensive French

    Directory of Open Access Journals (Sweden)

    Joan Netten

    2005-12-01

    Full Text Available Abstract Through research and classroom observation undertaken while conceptualizing and implementing the Intensive French program in Canada, many new insights were gained into the development of communication skills in a classroom situation. Five lessons learned about the development of spontaneous oral communication are presented in this article: the ineffectiveness of core French in primary school; the minimum number of intensive hours necessary to develop spontaneous oral communication; the need to develop implicit competence rather than explicit knowledge; the distinction between accuracy as knowledge and accuracy as skill; and the importance of teaching strategies focusing on language use. These lessons have implications for our understanding of how oral competence in an L2 develops and for the improvement of communicative language pedagogy.

  15. Digital control for nuclear reactors - lessons learned

    International Nuclear Information System (INIS)

    Bernard, J.A.; Aviles, B.N.; Lanning, D.D.

    1992-01-01

    Lessons learned during the course of the now decade-old MIT program on the digital control of nuclear reactors are enumerated. Relative to controller structure, these include the importance of a separate safety system, the need for signal validation, the role of supervisory algorithms, the significance of command validation, and the relevance of automated reasoning. Relative to controller implementation, these include the value of nodal methods to the creation of real-time reactor physics and thermal hydraulic models, the advantages to be gained from the use of real-time system models, and the importance of a multi-tiered structure to the simultaneous achievement of supervisory, global, and local control. Block diagrams are presented of proposed controllers and selected experimental and simulation-study results are shown. In addition, a history is given of the MIT program on reactor digital control

  16. Lessons learned using Snodgrass hypospadias repair.

    LENUS (Irish Health Repository)

    O'Connor, K M

    2012-02-03

    BACKGROUND: This is a review of our experience with the Snodgrass technique for distal hypospadias repair and we point to lessons learned in improving results. METHODS: We reviewed all patients who underwent Snodgrass hypospadias repair for distal hypospadias over a four-year period by a single surgeon. Chart review followed by parental telephone interview was used to determine voiding function, cosmesis and complication rate. RESULTS: Thirty children and three adults were identified. Age at surgery ranged from seven months to 39 years. The urinary stream was straight in 94%, and 97% reported a good or satisfactory final cosmetic outcome. One patient (3.3%) developed a urethral fistula and 21% developed meatal stenosis which required general anaesthetic. CONCLUSION: The Snodgrass urethroplasty provides satisfactory cosmetic and functional results. High rates of meatal stenosis initially encountered have improved with modifications to technique which include modified meatoplasty and routine meatal dilatation by the parents.

  17. Lessons learned during Type A Packaging testing

    International Nuclear Information System (INIS)

    O'Brien, J.H.; Kelly, D.L.

    1995-11-01

    For the past 6 years, the US Department of Energy (DOE) Office of Facility Safety Analysis (EH-32) has contracted Westinghouse Hanford Company (WHC) to conduct compliance testing on DOE Type A packagings. The packagings are tested for compliance with the U.S. Department of Transportation (DOT) Specification 7A, general packaging, Type A requirements. The DOE has shared the Type A packaging information throughout the nuclear materials transportation community. During testing, there have been recurring areas of packaging design that resulted in testing delays and/or initial failure. The lessons learned during the testing are considered a valuable resource. DOE requested that WHC share this resource. By sharing what is and can be encountered during packaging testing, individuals will hopefully avoid past mistakes

  18. Sellafield Decommissioning Programme - Update and Lessons Learned

    International Nuclear Information System (INIS)

    Lutwyche, P. R.; Challinor, S. F.

    2003-01-01

    The Sellafield site in North West England has over 240 active facilities covering the full nuclear cycle from fuel manufacture through generation, reprocessing and waste treatment. The Sellafield decommissioning programme was formally initiated in the mid 1980s though several plants had been decommissioned prior to this primarily to create space for other plants. Since the initiation of the programme 7 plants have been completely decommissioned, significant progress has been made in a further 16 and a total of 56 major project phases have been completed. This programme update will explain the decommissioning arrangements and strategies and illustrate the progress made on a number of the plants including the Windscale Pile Chimneys, the first reprocessing plan and plutonium plants. These present a range of different challenges and requiring approaches from fully hands on to fully remote. Some of the key lessons learned will be highlighted

  19. Lessons learned from the 1994 Northridge Earthquake

    International Nuclear Information System (INIS)

    Eli, M.W.; Sommer, S.C.

    1995-01-01

    Southern California has a history of major earthquakes and also has one of the largest metropolitan areas in the United States. The 1994 Northridge Earthquake challenged the industrial facilities and lifetime infrastructure in the northern Los Angeles (LA) area. Lawrence Livermore National Laboratory (LLNL) sent a team of engineers to conduct an earthquake damage investigation in the Northridge area, on a project funded jointly by the United States Nuclear Regulatory Commission (USNRC) and the United States Department of Energy (USDOE). Many of the structures, systems, and components (SSCs) and lifelines that suffered damage are similar to those found in nuclear power plants and in USDOE facilities. Lessons learned from these experiences can have some applicability at commercial nuclear power plants

  20. XML technology planning database : lessons learned

    Science.gov (United States)

    Some, Raphael R.; Neff, Jon M.

    2005-01-01

    A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

  1. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  2. Lessons from the organisation of the UK medical services deployed in support of Operation TELIC (Iraq) and Operation HERRICK (Afghanistan).

    Science.gov (United States)

    Bricknell, Martin C M; Nadin, M

    2017-08-01

    This paper provides the definitive record of the UK Defence Medical Services (DMS) lessons from the organisation of medical services in support of Operation (Op) TELIC (Iraq) and Op HERRICK (Afghanistan). The analysis involved a detailed review of the published academic literature, internal post-operational tour reports and post-tour interviews. The list of lessons was reviewed through three Military Judgement Panel cycles producing the single synthesis ' the golden thread ' and eight ' silver bullets ' as themes to institutionalise the learning to deliver the golden thread. One additional theme, mentoring indigenous healthcare systems and providers, emerged as a completely new capability requirement. The DMS has established a programme of work to implement these lessons. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  3. M-learning in a geography lesson

    Science.gov (United States)

    Mirski, Katri

    2014-05-01

    their work in Google Earth where they did a tour of their journey. In the feedback students said that it was a very interesting and an educational practical task. A new opportunity in M-learning is to use QR codes. This means that you don't have to print out worksheets with questions. You can hide question in the code and students can read them with their own devices on site. From the Master's thesis I also developed a tutorial material named "M-learning in a geography lesson" (in Estonian: M-õpe geograafiatunnis), you can see it in the webpage katrimope@wordpress.com. The tutorial received a second place on the Estonian study material contest in 2013. This is only one example on how to use M-learning. In Gustav Adolf Grammar School we use M-learning in lots of different subjects because it's really important in modern school to link new technologies, surrounding environment and learning for the purpose of better obtainment of knowledge.

  4. High Temperature Gas-Cooled Reactors Lessons Learned Applicable to the Next Generation Nuclear Plant

    International Nuclear Information System (INIS)

    Beck, J.M.; Collins, J.W.; Garcia, C.B.; Pincock, L.F.

    2010-01-01

    High Temperature Gas Reactors (HTGR) have been designed and operated throughout the world over the past five decades. These seven HTGRs are varied in size, outlet temperature, primary fluid, and purpose. However, there is much the Next Generation Nuclear Plant (NGNP) has learned and can learn from these experiences. This report captures these various experiences and documents the lessons learned according to the physical NGNP hardware (i.e., systems, subsystems, and components) affected thereby.

  5. Towards a lessons learned system for critical software

    International Nuclear Information System (INIS)

    Andrade, J.; Ares, J.; Garcia, R.; Pazos, J.; Rodriguez, S.; Rodriguez-Paton, A.; Silva, A.

    2007-01-01

    Failure can be a major driver for the advance of any engineering discipline and Software Engineering is no exception. But failures are useful only if lessons are learned from them. In this article we aim to make a strong defence of, and set the requirements for, lessons learned systems for safety-critical software. We also present a prototype lessons learned system that includes many of the features discussed here. We emphasize that, apart from individual organizations, lessons learned systems should target industrial sectors and even the Software Engineering community. We would like to encourage the Software Engineering community to use this kind of systems as another tool in the toolbox, which complements or enhances other approaches like, for example, standards and checklists

  6. Towards a lessons learned system for critical software

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, J. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: jag@udc.es; Ares, J. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: juanar@udc.es; Garcia, R. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: rafael@udc.es; Pazos, J. [Technical University of Madrid. Campus de Montegancedo, s/n. 28660, Boadilla del Monte, Madrid (Spain)]. E-mail: jpazos@fi.upm.es; Rodriguez, S. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: santi@udc.es; Rodriguez-Paton, A. [Technical University of Madrid. Campus de Montegancedo, s/n. 28660, Boadilla del Monte, Madrid (Spain)]. E-mail: arpaton@fi.upm.es; Silva, A. [Technical University of Madrid. Campus de Montegancedo, s/n. 28660, Boadilla del Monte, Madrid (Spain)]. E-mail: asilva@fi.upm.es

    2007-07-15

    Failure can be a major driver for the advance of any engineering discipline and Software Engineering is no exception. But failures are useful only if lessons are learned from them. In this article we aim to make a strong defence of, and set the requirements for, lessons learned systems for safety-critical software. We also present a prototype lessons learned system that includes many of the features discussed here. We emphasize that, apart from individual organizations, lessons learned systems should target industrial sectors and even the Software Engineering community. We would like to encourage the Software Engineering community to use this kind of systems as another tool in the toolbox, which complements or enhances other approaches like, for example, standards and checklists.

  7. Antarctic Exploration Parallels for Future Human Planetary Exploration: Science Operations Lessons Learned, Planning, and Equipment Capabilities for Long Range, Long Duration Traverses

    Science.gov (United States)

    Hoffman, Stephen J.

    2012-01-01

    The purpose for this workshop can be summed up by the question: Are there relevant analogs to planetary (meaning the Moon and Mars) to be found in polar exploration on Earth? The answer in my opinion is yes or else there would be no reason for this workshop. However, I think some background information would be useful to provide a context for my opinion on this matter. As all of you are probably aware, NASA has been set on a path that, in its current form, will eventually lead to putting human crews on the surface of the Moon and Mars for extended (months to years) in duration. For the past 50 V 60 years, starting not long after the end of World War II, exploration of the Antarctic has accumulated a significant body of experience that is highly analogous to our anticipated activities on the Moon and Mars. This relevant experience base includes: h Long duration (1 year and 2 year) continuous deployments by single crews, h Established a substantial outpost with a single deployment event to support these crews, h Carried out long distance (100 to 1000 kilometer) traverses, with and without intermediate support h Equipment and processes evolved based on lessons learned h International cooperative missions This is not a new or original thought; many people within NASA, including the most recent two NASA Administrators, have commented on the recognizable parallels between exploration in the Antarctic and on the Moon or Mars. But given that level of recognition, relatively little has been done, that I am aware of, to encourage these two exploration communities to collaborate in a significant way. [Slide 4] I will return to NASA s plans and the parallels with Antarctic traverses in a moment, but I want to spend a moment to explain the objective of this workshop and the anticipated products. We have two full days set aside for this workshop. This first day will be taken up with a series of presentations prepared by individuals with experience that extends back as far as the

  8. Implementing a lessons learned process at Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Fosshage, Erik D.; Drewien, Celeste A.; Eras, Kenneth; Hartwig, Ronald Craig; Post, Debra S.; Stoecker, Nora Kathleen

    2016-01-01

    The Lessons Learned Process Improvement Team was tasked to gain an understanding of the existing lessons learned environment within the major programs at Sandia National Laboratories, identify opportunities for improvement in that environment as compared to desired attributes, propose alternative implementations to address existing inefficiencies, perform qualitative evaluations of alternative implementations, and recommend one or more near-term activities for prototyping and/or implementation. This report documents the work and findings of the team.

  9. Experience gained from fires in nuclear power plants: Lessons learned

    International Nuclear Information System (INIS)

    2004-11-01

    In 1993, the IAEA launched a programme to assist Member States in improving fire safety in nuclear power plants (NPPs). The review of fire safety assessment in many plants has shown that fire is one of the most important risk contributors for NPPs. Moreover, operational experience has confirmed that many events have a similar root cause, initiation and development mechanism. Therefore, many States have improved the analysis of their operational experience and its feedback. States that operate NPPs play an important role in the effort to improve fire safety by circulating their experience internationally - this exchange of information can effectively prevent potential events. When operating experience is well organized and made accessible, it can feed an improved fire hazard assessment on a probabilistic basis. The practice of exchanging operational experience seems to be bearing fruit: serious events initiated by fire are on the decline at plants in operating States. However, to maximize this effort, means for communicating operational experience need to be continuously improved and the pool of recipients of operational experience data enlarged. The present publication is the third in a series started in 1998 on fire events, the first two were: Root Cause Analysis for Fire Events (IAEA-TECDOC-1112) and Use of Operational Experience in Fire Safety Assessment of Nuclear Power Plants (IAEA-TECDOC-1134). This TECDOC summarizes the experience gained and lessons learned from fire events at operating plants, supplemented by specific Member State experiences. In addition, it provides a possible structure of an international fire and explosion event database aimed at the analysis of experience from fire events and the evaluation of fire hazard. The intended readership of this is operators of plants and regulators. The present report includes a detailed analysis of the most recent events compiled with the IAEA databases and other bibliographic sources. It represents a

  10. Risk management and lessons learned solutions for satellite product assurance

    Science.gov (United States)

    Larrère, Jean-Luc

    2004-08-01

    The historic trend of the space industry towards lower cost programmes and more generally a better economic efficiency raises a difficult question to the quality assurance community: how to achieve the same—or better—mission success rate while drastically reducing the cost of programmes, hence the cost and level of quality assurance activities. EADS Astrium Earth Observation and Science (France) Business Unit have experimented Risk Management and Lessons Learned on their satellite programmes to achieve this goal. Risk analysis and management are deployed from the programme proposal phase through the development and operations phases. Results of the analysis and the corresponding risk mitigation actions are used to tailor the product assurance programme and activities. Lessons learned have been deployed as a systematic process to collect positive and negative experience from past and on-going programmes and feed them into new programmes. Monitoring and justification of their implementation in programmes is done under supervision from the BU quality assurance function. Control of the system is ensured by the company internal review system. Deployment of these methods has shown that the quality assurance function becomes more integrated in the programme team and development process and that its tasks gain focus and efficiency while minimising the risks associated with new space programmes.

  11. Lessons learned from decommissioning projects at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Salazar, M.

    1995-01-01

    This paper describes lessons learned over the last 20 years from 12 decommissioning projects at Los Alamos National Laboratory. These lessons relate both to overall program management and to management of specific projects during the planning and operations phases. The issues include waste management; the National Environmental Policy Act (NEPA); the Resource Conservation and Recovery Act (RCRA); the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); contracting; public involvement; client/customer interface; and funding. Key elements of our approach are to be proactive; follow the observation method; perform field activities concurrently; develop strategies to keep reportable incidents from delaying work; seek and use programs, methods, etc., in existence to shorten learning curves; network to help develop solutions; and avoid overstudying and overcharacterizing. This approach results in preliminary plans that require very little revision before implementation, reasonable costs and schedules, early acquisition of permits and NEPA documents, preliminary characterization reports, and contracting documents. Our track record is good -- the last four projects (uranium and plutonium-processing facility and three research reactors) have been on budget and on schedule

  12. Lessons learned in NEPA public involvement

    International Nuclear Information System (INIS)

    Stevens, A.D.; Glore, D.M.

    1995-01-01

    'In recent years Uncle Sam has been asking citizens for their help in improving the environment. The government is learning that with public input it can better prioritize environmental problems and more effectively direct limited funding.' The National Environmental Policy Act (NEPA), like many other government regulations, is a 'living law.' Although there are agency and Council guidelines, it is practical application, based on past practices and case law that refines the Act's broad concepts. The specifics of how to meet requirements are constantly being honed and melded to fit the unique situational needs of an agency, a project, or a public. This fluidity presents a challenge for stakeholder involvement activities. Communication practioners and project managers may have room for creativity and customized approaches, but they also find less than clear direction on what it takes to successfully avoid challenges of non-compliance. Because of the continuing uncertainty on how to involve the public meaningfully, it is vital to share important lessons learned from NEPA projects. The following practical suggestions are derived primarily from experiences with the Department of Energy's first ever complex-wide and site-specific environmental impact statement (EIS)-the Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs EIS (SNF ampersand INEL EIS)

  13. Lessons from feedback of safety operating experience for reactor physics

    International Nuclear Information System (INIS)

    Suchomel, J.; Rapavy, S.

    1999-01-01

    Analyses of events in WWER operations as a part of safety experience feedback provide a valuable source of lessons for reactor physics. Examples of events from Bohunice operation will be shown such as events with inadequate approach to criticality, positive reactivity insertions, expulsion of a control rod from shut-down reactor, problems with reactor protection system and control rods. (Authors)

  14. Learning from Iraq and Afghanistan: Four Lessons for Building More Effective Coalitions

    Directory of Open Access Journals (Sweden)

    White Nathan

    2016-06-01

    Full Text Available Despite many tactical and operational successes by brave military and civilian personnel, post-9/11 operations by U.S. led coalitions in Iraq and Afghanistan did not achieve their intended outcomes. Although many efforts are underway by discrete organizations within coalition countries to identify and learn their own lessons from these conflicts, comparatively less attention is paid to broader lessons for successful coalitions. Given that the U.S. and its allies will most certainly form coalitions in the future for a range of different contingency scenarios, these lessons are equally deserving of close examination. This article identifies four interrelated lessons from Iraq and Afghanistan that can be utilized to inform more effective coalition development and employment.

  15. Calibration Lessons Learned from Hyperion Experience

    Science.gov (United States)

    Casement, S.; Ho, K.; Sandor-Leahy, S.; Biggar, S.; Czapla-Myers, J.; McCorkel, J.; Thome, K.

    2009-12-01

    The use of hyperspectral imagers to provide climate-quality data sets, such as those expected from the solar reflective sensor on the Climate Absolute Radiance and Refractivity Observatory (CLARREO), requires stringent radiometric calibration requirements. These stringent requirements have been nearly met with broadband radiometers such as CERES, but high resolution spectrometers pose additional challenges. A review of the calibration processes for past space-based HSIs provide guidance on the calibration processes that will be needed for future sensors. In November 2000, the Earth Observer-1 (EO-1) platform was launched onboard a Boeing Delta II launch vehicle. The primary purpose of the EO-1 mission was to provide a technological testbed for spaceborne components. The platform has three sensors onboard, of which, the hyperspectral imager (HSI) Hyperion, is discussed here. The Hyperion sensor at the time had no comparable sensor in earth orbit, being the first grating-based, hyperspectral, civilian sensor in earth orbit. Ground and on-orbit calibration procedures including all cross-calibration activities have achieved an estimated instrument absolute radiometric error of 2.9% in the Visible channel (0.4 - 1.0 microns) and 3.4% in the shortwave infrared (SWIR, 0.9 - 2.5 microns) channel (EO-1/Hyperion Early Orbit Checkout Report Part II On-Orbit Performance Verification and Calibration). This paper describes the key components of the Hyperion calibration process that are applicable to future HSI missions. The pre-launch methods relied on then newly-developed, detector-based methods. Subsequent vicarious methods including cross-calibration with other sensors and the reflectance-based method showed significant differences from the prelaunch calibration. Such a difference demonstrated the importance of the vicarious methods as well as pointing to areas for improvement in the prelaunch methods. We also identify areas where lessons learned from Hyperion regarding

  16. Lessons Learned in International Safeguards - Implementation of Safeguards at the Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    Ehinger, Michael H.; Johnson, Shirley

    2010-01-01

    The focus of this report is lessons learned at the Rokkasho Reprocessing Plant (RRP). However, the subject of lessons learned for application of international safeguards at reprocessing plants includes a cumulative history of inspections starting at the West Valley (New York, U.S.A.) reprocessing plant in 1969 and proceeding through all of the efforts over the years. The RRP is the latest and most challenging application the International Atomic Energy Agency has faced. In many ways the challenges have remained the same, timely inspection and evaluation with limited inspector resources, with the continuing realization that planning and preparations can never start early enough in the life cycle of a facility. Lessons learned over the years have involved the challenges of using ongoing advances in technology and dealing with facilities with increased throughput and continuous operation. This report will begin with a review of historical developments and lessons learned. This will provide a basis for a discussion of the experiences and lessons learned from the implementation of international safeguards at RRP.

  17. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    regime to ensure that all aspects of the equipment are fully functional. If problems exist it is better to know about them prior to implementation. This paper will discuss the results of the subtasks completed under Task E.125 and the progress of active subtasks. The cost/benefit of these subtasks will be addressed. Lessons learned by the U.S. Support Program in undertaking these tasks will be identified. (author)

  18. Lessons Learned Report for the radioactive mixed waste land disposal facility (Trench 31, Project W-025)

    International Nuclear Information System (INIS)

    Irons, L.G.

    1995-01-01

    This report presents the lessons learned from a project that involved modification to the existing burial grounds at the Hanford Reservation. This project has been focused on the development and operation of a Resource Conservation and Recovery Act compliant landfill which will accept low-level radioactive wastes that have been placed in proper containers

  19. The CanMars Analogue Mission: Lessons Learned for Mars Sample Return

    Science.gov (United States)

    Osinski, G. R.; Beaty, D.; Battler, M.; Caudill, C.; Francis, R.; Haltigin, T.; Hipkin, V.; Pilles, E.

    2018-04-01

    We present an overview and lessons learned for Mars Sample Return from CanMars — an analogue mission that simulated a Mars 2020-like cache mission. Data from 39 sols of operations conducted in the Utah desert in 2015 and 2016 are presented.

  20. Comparison of plant-specific probabilistic safety assessments and lessons learned

    International Nuclear Information System (INIS)

    Balfanz, H.P.; Berg, H.P.; Steininger, U.

    2001-01-01

    Probabilistic safety assessments (PSA) have been performed for all German nuclear power plants in operation. These assessments are mainly based on the recent German PSA guide and an earlier draft, respectively. However, comparison of these PSA show differences in the results which are discussed in this paper. Lessons learned from this comparison and further development of the PSA methodology are described. (orig.) [de

  1. The role of failure/problems in engineering: A commentary of failures experienced - lessons learned

    Science.gov (United States)

    Ryan, R. S.

    1992-03-01

    The written version of a series of seminars given to several aerospace companies and three NASA centers are presented. The results are lessons learned through a study of the problems experienced in 35 years of engineering. The basic conclusion is that the primary cause of problems has not been mission technologies, as important as technology is, but the neglect of basic principles. Undergirding this is the lack of a systems focus from determining requirements through design, verification, and operations phases. Many of the concepts discussed are fundamental to total quality management (TQM) and can be used to augment this product enhanced philosophy. Fourteen principles are addressed with problems experienced and are used as examples. Included is a discussion of the implication of constraints, poorly defined requirements, and schedules. Design guidelines, lessons learned, and future tasks are listed. Two additional sections are included that deal with personal lessons learned and thoughts on future thrusts (TQM).

  2. The role of failure/problems in engineering: A commentary of failures experienced - lessons learned

    Science.gov (United States)

    Ryan, R. S.

    1992-01-01

    The written version of a series of seminars given to several aerospace companies and three NASA centers are presented. The results are lessons learned through a study of the problems experienced in 35 years of engineering. The basic conclusion is that the primary cause of problems has not been mission technologies, as important as technology is, but the neglect of basic principles. Undergirding this is the lack of a systems focus from determining requirements through design, verification, and operations phases. Many of the concepts discussed are fundamental to total quality management (TQM) and can be used to augment this product enhanced philosophy. Fourteen principles are addressed with problems experienced and are used as examples. Included is a discussion of the implication of constraints, poorly defined requirements, and schedules. Design guidelines, lessons learned, and future tasks are listed. Two additional sections are included that deal with personal lessons learned and thoughts on future thrusts (TQM).

  3. Collecting lessons learned : How project-based organizations in the oil and gas industry learn from their projects

    NARCIS (Netherlands)

    Buttler, T.

    2016-01-01

    Project-based organizations collect lessons learned in order to improve the performance of projects. They aim to repeat successes by using positive lessons learned, and to avoid repeating negative experiences by using negative lessons learned. Cooke-Davies (2002) claimed that the ability to learn

  4. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, Jeffrey H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2010-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  5. The German Chernobyl project: Lessons learned

    International Nuclear Information System (INIS)

    Hill, P.; Hille, R.

    1999-01-01

    This report presents results and lessons learned by one of the so far largest assessments of a post-accidental situation. Funded by the Federal Republic of Germany the German Chernobyl Project investigated in the years 1991-1993 the radiological situation in contaminated regions of the Russian Federation, Belarus and Ukraine. Measurements included a mass screening of the population in order to determine the Cesium body burdens of 250,000+ individuals in more than 240 settlements as well as the evaluation of external doses in selected settlements with soil contaminations varying from less than 74 kBq/m 2 to about 3700 kBq/m 2 including some, where decontamination measures had previously been taken. Also in many settlements environmental monitoring was undertaken. For most individuals doses did not exceed the international annual limits set for the general population. Open and comprehensive communication of results was favourably accepted by the public. In a few settlements the radiological situation has been followed up till to date. (author)

  6. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, J.H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2009-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project

  7. Value-Based Requirements Traceability: Lessons Learned

    Science.gov (United States)

    Egyed, Alexander; Grünbacher, Paul; Heindl, Matthias; Biffl, Stefan

    Traceability from requirements to code is mandated by numerous software development standards. These standards, however, are not explicit about the appropriate level of quality of trace links. From a technical perspective, trace quality should meet the needs of the intended trace utilizations. Unfortunately, long-term trace utilizations are typically unknown at the time of trace acquisition which represents a dilemma for many companies. This chapter suggests ways to balance the cost and benefits of requirements traceability. We present data from three case studies demonstrating that trace acquisition requires broad coverage but can tolerate imprecision. With this trade-off our lessons learned suggest a traceability strategy that (1) provides trace links more quickly, (2) refines trace links according to user-defined value considerations, and (3) supports the later refinement of trace links in case the initial value consideration has changed over time. The scope of our work considers the entire life cycle of traceability instead of just the creation of trace links.

  8. Intelligence and Nuclear Proliferation: Lessons Learned

    International Nuclear Information System (INIS)

    Hansen, Keith A.

    2011-09-01

    Intelligence agencies play a fundamental role in the prevention of nuclear proliferation, as they help to understand other countries' intentions and assess their technical capabilities and the nature of their nuclear activities. The challenges in this area remain, however, formidable. Past experiences and the discoveries of Iraq's WMD programs, of North Korean nuclear weapon program, and of Iranian activities, have put into question the ability of intelligence to monitor small, clandestine proliferation activities from either states or non-state entities. This Proliferation Paper analyzes the complex challenges intelligence faces and the various roles it plays in supporting national and international nuclear non-proliferation efforts, and reviews its track record. In an effort to shed light on the role and contribution of intelligence in national and international efforts to halt, if not prevent, further nuclear weapon proliferation, this paper first analyzes the challenges intelligence faces in monitoring small, clandestine proliferation activities and the role it plays in supporting non-proliferation efforts. It then reviews the intelligence track record in monitoring proliferation including the lessons learned from Iraq. Finally, it addresses whether it is possible for intelligence to accurately monitor future clandestine proliferation efforts. (author)

  9. Constellation Program: Lessons Learned. Volume 1; Executive Summary

    Science.gov (United States)

    Rhatigan, Jennifer L. (Editor)

    2011-01-01

    This document (Volume I) provides an executive summary of the lessons learned from the Constellation Program. A companion Volume II provides more detailed analyses for those seeking further insight and information. In this volume, Section 1.0 introduces the approach in preparing and organizing the content to enable rapid assimilation of the lessons. Section 2.0 describes the contextual framework in which the Constellation Program was formulated and functioned that is necessary to understand most of the lessons. Context of a former program may seem irrelevant in the heady days of new program formulation. However, readers should take some time to understand the context. Many of the lessons would be different in a different context, so the reader should reflect on the similarities and differences in his or her current circumstances. Section 3.0 summarizes key findings developed from the significant lessons learned at the program level that appear in Section 4.0. Readers can use the key findings in Section 3.0 to peruse for particular topics, and will find more supporting detail and analyses in Section 4.0 in a topical format. Appendix A contains a white paper describing the Constellation Program formulation that may be of use to readers wanting more context or background information. The reader will no doubt recognize some very similar themes from previous lessons learned, blue-ribbon committee reviews, National Academy reviews, and advisory panel reviews for this and other large-scale human spaceflight programs; including Apollo, Space Shuttle, Shuttle/Mir, and the ISS. This could represent an inability to learn lessons from previous generations; however, it is more likely that similar challenges persist in the Agency structure and approach to program formulation, budget advocacy, and management. Perhaps the greatest value of these Constellation lessons learned can be found in viewing them in context with these previous efforts to guide and advise the Agency and its

  10. Lessons learned from accidental exposures in radiotherapy

    International Nuclear Information System (INIS)

    2000-01-01

    The medical use of radiation is unique in that patients are intentionally exposed to radiation. The aim in radiation therapy is twofold: to deliver a dose and dose distribution that is adequate for tumour control, but which also minimizes complications in normal tissues. In therapeutic applications, the doses are high and a deviation from the prescribed dose may have severe or even fatal consequences. There is therefore a great need to ensure adequate radiation protection and safety in radiotherapy by verifying that all personnel involved are appropriately trained for their duties, that the equipment used meets relevant international specifications for radiation safety and that safety culture is embedded in routine activities in radiotherapy departments. Many individuals must interact and work together on highly technical measurements and calculations, and therefore the potential for mistakes is great. A review of the mistakes shows that most are due to human error. The International Basic Safety Standards for Protection against Ionizing Radiation and the Safety of Radiation Sources (IAEA Safety Series No. 115) require that a prompt investigation be conducted whenever an accidental medical exposure of patients occurs. The report of the investigation is to be disseminated to the appropriate parties so that lessons can be learned to prevent similar accidents or mitigate their consequences in the future. This Safety Report is a collection of a large number of events that may serve as a checklist against which to test the vulnerability of a facility to potential accidents, and to provide a basis for improving safety in the use of radiation in medical applications. A further purpose of this report is to encourage readers to develop a questioning and learning attitude, adopt measures for the prevention of accidents, and prepare for mitigation of the consequences of accidents if they occur

  11. Lessons learned on probabilistic methodology for precursor analyses

    International Nuclear Information System (INIS)

    Babst, Siegfried; Wielenberg, Andreas; Gaenssmantel, Gerhard

    2016-01-01

    Based on its experience in precursor assessment of operating experience from German NPP and related international activities in the field, GRS has identified areas for enhancing probabilistic methodology. These are related to improving the completeness of PSA models, to insufficiencies in probabilistic assessment approaches, and to enhancements of precursor assessment methods. Three examples from the recent practice in precursor assessments illustrating relevant methodological insights are provided and discussed in more detail. Our experience reinforces the importance of having full scope, current PSA models up to Level 2 PSA and including hazard scenarios for precursor analysis. Our lessons learned include that PSA models should be regularly updated regarding CCF data and inclusion of newly discovered CCF mechanisms or groups. Moreover, precursor classification schemes should be extended to degradations and unavailabilities of the containment function. Finally, PSA and precursor assessments should put more emphasis on the consideration of passive provisions for safety, e. g. by sensitivity cases.

  12. Lessons learned on probabilistic methodology for precursor analyses

    Energy Technology Data Exchange (ETDEWEB)

    Babst, Siegfried [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Berlin (Germany); Wielenberg, Andreas; Gaenssmantel, Gerhard [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Garching (Germany)

    2016-11-15

    Based on its experience in precursor assessment of operating experience from German NPP and related international activities in the field, GRS has identified areas for enhancing probabilistic methodology. These are related to improving the completeness of PSA models, to insufficiencies in probabilistic assessment approaches, and to enhancements of precursor assessment methods. Three examples from the recent practice in precursor assessments illustrating relevant methodological insights are provided and discussed in more detail. Our experience reinforces the importance of having full scope, current PSA models up to Level 2 PSA and including hazard scenarios for precursor analysis. Our lessons learned include that PSA models should be regularly updated regarding CCF data and inclusion of newly discovered CCF mechanisms or groups. Moreover, precursor classification schemes should be extended to degradations and unavailabilities of the containment function. Finally, PSA and precursor assessments should put more emphasis on the consideration of passive provisions for safety, e. g. by sensitivity cases.

  13. External Police Oversight in Mexico: Experiences, Challenges, and Lessons Learned

    Directory of Open Access Journals (Sweden)

    Rubén Guzmán Sánchez

    2014-11-01

    Full Text Available After nearly 20 years of ‘reformist’ measures, the police in Mexico continues to be an ineffective, unreliable, and ‘far from citizen’ institution. The efforts made so far have faded amongst political interests and agendas; multidimensional frameworks out-dated at both conceptual and interagency levels; short-sighted competition for resources; evaluation and performance monitors that are handicapped by bureaucratic inaction; and weak transparency and accountability that perpetuate the opacity in which the police operate. In this context, the agenda of external police oversight is still at a rudimentary stage. However, there are several initiatives that have managed to push the issue to the frontier of new knowledge and promising practices. This paper outlines the experiences and challenges of—as well as the lessons learned by—the Institute for Security and Democracy (Insyde A.C., one of the most recognised think tanks in Mexico.

  14. Lesson Learned About FPOs from a Customer`s Perspective

    Energy Technology Data Exchange (ETDEWEB)

    Gray, C.J.

    1998-12-31

    Conoco has undertaken three FPSO (Floating Production Storage and Off-loading) projects in the 1990s, Ukpokiti offshore Nigeria, and MacCulloch and Banff in the UK sector of the North Sea. They are different in the technical and commercial solutions they employed. This presentation describes the key features of each project from a commercial and technical perspective and summarizes the good practices and those aspects that could have been improved. The key commercial areas covered include project strategy, contractor selection and leasing issues. The technical areas include facility selection, reservoir characterization, and operations. Lessons learned about Safety Management are also identified. The information about each project is limited to key features only

  15. Pollution prevention program for new projects -- Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Lum, J. [Dept. of Energy, Washington, DC (United States)

    1993-03-01

    The purpose of this presentation is to relay the experience of the Office of New Production Reactors (NP) in developing and implementing its pollution prevention program. NP was established to plan, design, and construct a new safe and environmentally acceptable nuclear reactor capacity necessary to provide an assured supply of tritium to maintain the nation`s long-term deterrent capability. The Program offered the Department of Energy an opportunity to demonstrate its commitment to environmental protection via minimization of environmental releases; new design offers the best opportunity for pollution prevention. The NP pollution prevention program was never fully implemented because NP`s tritium production design activity was recovery terminated. The information in this paper represented lessons learned from the last three years of NP operation.

  16. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  17. Let's Cooperate! Integrating Cooperative Learning Into a Lesson on Ethics.

    Science.gov (United States)

    Reineke, Patricia R

    2017-04-01

    Cooperative learning is an effective teaching strategy that promotes active participation in learning and can be used in academic, clinical practice, and professional development settings. This article describes that strategy and provides an example of its use in a lesson about ethics. J Contin Nurs Educ. 2017;48(4):154-156. Copyright 2017, SLACK Incorporated.

  18. Dominating Duffer’s Domain: Lessons for the U.S. Marine corps Information Operations Practitioner

    Science.gov (United States)

    2017-01-01

    has learned 26 hard -won lessons that readers may find useful for the future conduct and planning of IO. The principles espoused here were derived from...to be frank, it wasn’t that hard . I had done the ten-day Intermediate MAGTF (Marine Air Ground Task Force) Information Operations Practitioner...paragraph, with no phases. It was, however, beauti- fully formatted , and the task listing had everything: military deception, electronic warfare, OPSEC

  19. A Text Mining Approach for Extracting Lessons Learned from Project Documentation: An Illustrative Case Study

    Directory of Open Access Journals (Sweden)

    Benjamin Matthies

    2017-12-01

    Full Text Available Lessons learned are important building blocks for continuous learning in project-based organisations. Nonetheless, the practical reality is that lessons learned are often not consistently reused for organisational learning. Two problems are commonly described in this context: the information overload and the lack of procedures and methods for the assessment and implementation of lessons learned. This paper addresses these problems, and appropriate solutions are combined in a systematic lesson learned process. Latent Dirichlet Allocation is presented to solve the first problem. Regarding the second problem, established risk management methods are adapted. The entire lessons learned process will be demonstrated in a practical case study

  20. Stand-alone photovoltaic applications. Lessons learned

    International Nuclear Information System (INIS)

    Loois, G.; Van Hemert, B.

    1999-02-01

    The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative R and D agreements established within the IEA. The objective of Task III is to promote and facilitate the exchange of information and experiences in the field of PV Systems in Stand-alone and Island Applications (SAPV). The book focuses on the practical experiences gained, and does not aim to provide a complete manual on SAPV. When Task III started its activities in 1993, a collection of 50 'State of the art' projects was published in the book 'Examples of Stand-Alone Photovoltaic Systems'. This publication marked the base line for the work of the task. Now, in 1998, the showcases from each country demonstrate the lessons learned in five years of cooperation. The book consists of two parts. The first part contains eight chapters dealing with a specific aspect of stand-alone PV. The second part introduces 14 national showcase projects in a systematic presentation. Each chapter and showcase can be read independently from the rest of the book. Chapter 2, contributed by The Netherlands, analyses the market for stand-alone PV systems. It gives an overview of the 'traditional' application of stand-alone PV, which is the electrification of remote buildings and which has been addressed in depth in other publications. The focus is on the market niches of service applications that are also interesting for more densely populated areas, e.g. in industrialised countries. The United Kingdom illustrates the economic aspects in Chapter 3. Cost comparisons are made, but more important is the illustration of the non-financial considerations that make PV the preferred choice as a power source for many applications. Switzerland explores in Chapter 4 (financing aspects) different financing mechanisms, and financial policies used to overcome the initial cost barrier. Most of these approaches have been applied in developing countries rather than in the western world. Using various examples from all over the

  1. Integrated Programme Control Systems: Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Brown, C. W. [Babcock International Group PLC (formerly UKAEA Ltd) B21 Forss, Thurso, Caithness, Scotland (United Kingdom)

    2013-08-15

    Dounreay was the UK's centre of fast reactor research and development from 1955 until 1994 and is now Scotland's largest nuclear clean up and demolition project. After four decades of research, Dounreay is now a site of construction, demolition and waste management, designed to return the site to as near as practicable to its original condition. Dounreay has a turnover in the region of Pounds 150 million a year and employs approximately 900 people. It subcontracts work to 50 or so companies in the supply chain and this provides employment for a similar number of people. The plan for decommissioning the site anticipates all redundant buildings will be cleared in the short term. The target date to achieve interim end state by 2039 is being reviewed in light of Government funding constraints, and will be subject to change through the NDA led site management competition. In the longer term, controls will be put in place on the use of contaminated land until 2300. In supporting the planning, management and organisational aspects for this complex decommissioning programme an integrated programme controls system has been developed and deployed. This consists of a combination of commercial and bespoke tools integrated to support all aspects of programme management, namely scope, schedule, cost, estimating and risk in order to provide baseline and performance management data based upon the application of earned value management principles. Through system evolution and lessons learned, the main benefits of this approach are management data consistency, rapid communication of live information, and increased granularity of data providing summary and detailed reports which identify performance trends that lead to corrective actions. The challenges of such approach are effective use of the information to realise positive changes, balancing the annual system support and development costs against the business needs, and maximising system performance. (author)

  2. A summary of lessons learned at the Shippingport Station Decommissioning Project (SSDP)

    International Nuclear Information System (INIS)

    Crimi, F.P.; Mullee, G.R.

    1987-10-01

    This paper describes the lessons learned from a management perspective during decommissioning. The lessons learned are presented in a chronological sequence during the life of the project up to the present time. The careful analysis of the lessons learned and the implementation of corresponding actions have contributed toward improving the effectiveness of decommissioning as time progresses. The lessons learned should be helpful in planning future decommissioning projects

  3. Lessons learned from TECNATOM's participation in the construction of NPP's

    International Nuclear Information System (INIS)

    Manrique, Alberto B.

    2010-01-01

    TECNATOM is a Spanish engineering company with more than 50 years of experience working for the nuclear industry across the world. TECNATOM has worked in over 30 countries in activities relating to the Operation and Maintenance of Nuclear Power Plants. The company started to work in the design of new Nuclear Power Plants in the early 90's and since then has continued to collaborate with different suppliers in the design and licensing of new reactors, especially in the areas of plant systems design, Man-Machine Interface design, the construction of Main Control Room simulators, training, the qualification of equipment and PSI/ISI engineering services. New man-machine interface designs and modifications are produced for both, new Nuclear Power Plants and existing facilities. For these new designs Human Factors Engineering must be applied, as in the case of any other traditional engineering discipline. The advantages of implementing adequate Human Factors Engineering techniques in the design of nuclear reactors have become not only a fact recognized by the majority of engineers and operators, but also an explicit requirement which is regulated and mandatory for the new designs. Additionally, the major savings achieved by a Nuclear Power Plant that has an operating methodology that significantly decreases the risk of operating errors makes their implementation necessary and almost vital. This paper describes the experience and lessons learned from TECNATOM's participation in the design of reactors belonging to Generations III, III+ and IV. (authors)

  4. Space Mechanisms Lessons Learned and Accelerated Testing Studies

    Science.gov (United States)

    Fusaro, Robert L.

    1997-01-01

    A number of mechanism (mechanical moving component) failures and anomalies have recently occurred on satellites. In addition, more demanding operating and life requirements have caused mechanism failures or anomalies to occur even before some satellites were launched (e.g., during the qualification testing of GOES-NEXT, CERES, and the Space Station Freedom Beta Joint Gimbal). For these reasons, it is imperative to determine which mechanisms worked in the past and which have failed so that the best selection of mechanically moving components can be made for future satellites. It is also important to know where the problem areas are so that timely decisions can be made on the initiation of research to develop future needed technology. To chronicle the life and performance characteristics of mechanisms operating in a space environment, a Space Mechanisms Lessons Learned Study was conducted. The work was conducted by the NASA Lewis Research Center and by Mechanical Technologies Inc. (MTI) under contract NAS3-27086. The expectation of the study was to capture and retrieve information relating to the life and performance of mechanisms operating in the space environment to determine what components had operated successfully and what components had produced anomalies.

  5. Lessons learned from radiological accidents at medical exposures in radiotherapy

    International Nuclear Information System (INIS)

    Fagundes, J.S.; Ferreira, A.F.; Lima, C.M.A.; Silva, F.C.A. da

    2017-01-01

    An exposure is considered accidental in radiotherapy when there is a substantial deviation in the prescription of treatment. In this work, an analysis of published radiological accidents, both in Brazil and internationally, was performed during medical exposures in radiotherapy treatments, removing the main lessons learned. Of the research carried out, we highlight Brazil with four radiological accidents and one death in the period between 2011 and 2014; the United States of America with 169 accidents with two deaths from 2000 to 2010 and France from 2001 to 2014 had 569 deaths without patients. Lessons learned have been described, for example, that maintenance personnel training should specify limitations or restrictions on the handling or adjustment of critical parts on the accelerator. It is recommended to apply the 10 main lessons learned due to radiological accidents during medical exposures in radiotherapy treatments to avoid future events

  6. Lessons Learned for the MICE Coupling Solenoid from the MICE Spectrometer Solenoids

    International Nuclear Information System (INIS)

    Green, Michael A.; Wang, Li; Pan, Heng; Wu, Hong; Guo, Xinglong; Li, S.Y.; Zheng, S.X.; Virostek, Steve P.; DeMello, Allen J.; Li, Derun; Trillaud, Frederick; Zisman, Michael S.

    2010-01-01

    Tests of the spectrometer solenoids have taught us some important lessons. The spectrometer magnet lessons learned fall into two broad categories that involve the two stages of the coolers that are used to cool the magnets. On the first spectrometer magnet, the problems were centered on the connection of the cooler 2nd-stage to the magnet cold mass. On the first test of the second spectrometer magnet, the problems were centered on the cooler 1st-stage temperature and its effect on the operation of the HTS leads. The second time the second spectrometer magnet was tested; the cooling to the cold mass was still not adequate. The cryogenic designs of the MICE and MuCOOL coupling magnets are quite different, but the lessons learned from the tests of the spectrometer magnets have affected the design of the coupling magnets.

  7. Safety Requirements / Design Criteria for SFR. Lessons Learned from the Fukushima Dai-ichi Accident

    International Nuclear Information System (INIS)

    Yllera, Javier

    2013-01-01

    After the Fukushima event (March 2011) the IAEA has started an action to review and revise, if necessary, all Safety Standards to take into consideration the lessons learned from the accident. The Safety Standards that need to be revised have been identified. A Prioritization Approach has been established: The first priority is to review safety guides applicable for NPPs and spent fuel storage with focus on the measures for the prevention and mitigation of severe accident due to external hazards - ● Regulatory framework, Safety assessment, Management system, Radiation protection and Emergency Preparedness and response; ● Sitting, Design, Operation of NPPs ● Decommissioning and Waste Management. Original sources for lessons learned: IAE fact Finding Mission, Japan´s report to the Ministerial Conference, INSAG Report, etc. Later, other lesson sources considered

  8. Human Systems Integration in Practice: Constellation Lessons Learned

    Science.gov (United States)

    Zumbado, Jennifer Rochlis

    2012-01-01

    NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.

  9. PUREX/UO3 Facilities deactivation lessons learned history

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1996-09-19

    objectives of the project in mind can guide decisions that reduce risks with minimal manipulation of physical materials, minimal waste generation, streamline regulations and safety requirements where possible, and separate the facility from ongoing entanglements with operating systems. Thus, the ``parked car`` state is achieved quickly and directly. The PUREX Deactivation Lessons Learned History was first issued in January 1995. Since then, several key changes have occurred in the project, making it advisable to revise and update the document. This document is organized with the significant lessons learned captured at the end of each section, and then recounted in Section 11.0, ``Lessons Consolidated.`` It is hoped and believed that the lessons learned on the PUREX Deactivation Project will have value to other facilities both inside and outside the DOE complex.

  10. Lessons to be learned from an analysis of ammonium nitrate disasters in the last 100 years

    Energy Technology Data Exchange (ETDEWEB)

    Pittman, William; Han, Zhe; Harding, Brian; Rosas, Camilo; Jiang, Jiaojun; Pineda, Alba; Mannan, M. Sam, E-mail: mannan@tamu.edu

    2014-09-15

    Highlights: • Root causes and contributing factors from ammonium nitrate incidents are categorized into 10 lessons. • The lessons learned from the past 100 years of ammonium nitrate incidents can be used to improve design, operation, and maintenance procedures. • Improving organizational memory to help improve safety performance. • Combating and changing organizational cultures. - Abstract: Process safety, as well as the safe storage and transportation of hazardous or reactive chemicals, has been a topic of increasing interest in the last few decades. The increased interest in improving the safety of operations has been driven largely by a series of recent catastrophes that have occurred in the United States and the rest of the world. A continuous review of past incidents and disasters to look for common causes and lessons is an essential component to any process safety and loss prevention program. While analyzing the causes of an accident cannot prevent that accident from occurring, learning from it can help to prevent future incidents. The objective of this article is to review a selection of major incidents involving ammonium nitrate in the last century to identify common causes and lessons that can be gleaned from these incidents in the hopes of preventing future disasters. Ammonium nitrate has been involved in dozens of major incidents in the last century, so a subset of major incidents were chosen for discussion for the sake of brevity. Twelve incidents are reviewed and ten lessons from these incidents are discussed.

  11. Lessons to be learned from an analysis of ammonium nitrate disasters in the last 100 years

    International Nuclear Information System (INIS)

    Pittman, William; Han, Zhe; Harding, Brian; Rosas, Camilo; Jiang, Jiaojun; Pineda, Alba; Mannan, M. Sam

    2014-01-01

    Highlights: • Root causes and contributing factors from ammonium nitrate incidents are categorized into 10 lessons. • The lessons learned from the past 100 years of ammonium nitrate incidents can be used to improve design, operation, and maintenance procedures. • Improving organizational memory to help improve safety performance. • Combating and changing organizational cultures. - Abstract: Process safety, as well as the safe storage and transportation of hazardous or reactive chemicals, has been a topic of increasing interest in the last few decades. The increased interest in improving the safety of operations has been driven largely by a series of recent catastrophes that have occurred in the United States and the rest of the world. A continuous review of past incidents and disasters to look for common causes and lessons is an essential component to any process safety and loss prevention program. While analyzing the causes of an accident cannot prevent that accident from occurring, learning from it can help to prevent future incidents. The objective of this article is to review a selection of major incidents involving ammonium nitrate in the last century to identify common causes and lessons that can be gleaned from these incidents in the hopes of preventing future disasters. Ammonium nitrate has been involved in dozens of major incidents in the last century, so a subset of major incidents were chosen for discussion for the sake of brevity. Twelve incidents are reviewed and ten lessons from these incidents are discussed

  12. Forensic Archaeological Recovery of a Large-Scale Mass Disaster Scene: Lessons Learned from Two Complex Recovery Operations at the World Trade Center Site.

    Science.gov (United States)

    Warnasch, Scott C

    2016-05-01

    In 2006, unexpected discoveries of buried World Trade Center (WTC) debris and human remains were made at the World Trade Center mass disaster site. New York City's Office of Chief Medical Examiner (OCME) was given the task of systematically searching the site for any remaining victims' remains. The subsequent OCME assessment and archaeological excavation conducted from 2006 until 2013, resulted in the recovery of over 1,900 victims' remains. In addition, this operation demonstrated the essential skills archaeologists can provide in a mass disaster recovery operation. The OCME excavation data illustrates some of the challenges encountered during the original recovery effort of 2001/2002. It suggests that when understood within the larger site recovery context, certain fundamental components of the original recovery effort, such as operational priorities and activities in effect during the original recovery, directly or indirectly resulted in unsearched deposits that contained human remains. © 2016 American Academy of Forensic Sciences.

  13. Shared Learning and the Drive to Improve Patient Safety: Lessons Learned from the Pittsburgh Regional Healthcare Initiative

    National Research Council Canada - National Science Library

    Sirio, Carl A; Keyser, Donna J; Norman, Heidi; Weber, Robert J; Muto, Carlene A

    2005-01-01

    Based on lessons learned through implementation of the Pittsburgh Regional Healthcare Initiative's region-wide shared learning model, we have identified the environmental, cultural, and infrastructure...

  14. Supply chain management/ Some lessons learned the hard way.

    Science.gov (United States)

    Nuttall, Stephen

    2013-01-01

    This paper will look at some of the experiences, lessons and frustrations experienced in managing supply chains for business continuity. No-one has time to make all the mistakes, nor to learn all the lessons on their own, so it is useful to share experiences. Over the last 25 years, the author has been involved in supply chain management as a contract manager; a programme and project manager; and as a business continuity manager. Although times change, there are some fundamental principles that are absolutely critical in making sure that supply chains do what they are needed to do/ to keep business going. Supply chains are here to stay. Indeed, with today's drive towards outsourcing, best-shoring and contracting out, they are becoming more important every year and this will only continue over time. Moreover, in the highly competitive markets in which all organisations operate, suppliers may well be carrying out operations that not all that long ago would have been considered to be part of core business. Getting the right relationship with the supply chain is more critical than ever before.1 What does this mean to business continuity professionals? They need to think not just about their own BC plans, but about the plans of their suppliers, and even those of their suppliers' suppliers. This may seem obvious, but unlike internal BC plans written by and for an organisation, it must be considered just what a supplier's plans are designed to achieve. What business outcomes will their plans deliver? If they recover their own business, how does that affect the business they serve? Are others' assumptions of how they will react in line with theirs?

  15. Operational Design for Peace Enforcement: Lessons for the Operational Staff

    National Research Council Canada - National Science Library

    Neumann, Michael

    2004-01-01

    U.S. involvement in Somalia serves as a useful case study of the unique challenges an operational staff may face when applying operational design to the planning and execution of a peace enforcement operation. U.S...

  16. The flower and the butterfly constructed wetland system at Koh Phi Phi - system design and lessons learned during implementation and operation

    DEFF Research Database (Denmark)

    Brix, Hans; Koottatep, Thammarat; Fryd, Ole

    2011-01-01

    In 2007, a constructed wetland system was implemented on the tourist island of Koh Phi Phi in Southern Thailand. This paper presents the process of planning, designing and implementing the system and discusses the performance and operational issues 3 years after implementation. The system is an i...

  17. A Review of Supplementary Medical Aspects of Post-Cold War UN Peacekeeping Operations: Trends, Lessons Learned, Courses of Action, and Recommendations.

    Science.gov (United States)

    Johnson, Ralph J

    2015-01-01

    Post-Cold War United Nations Peace Keeping Operations (UN PKOs) have been increasingly involved in dangerous areas with ill-defined boundaries, harsh and remote geographies, simmering internecine armed conflict, and disregard on the part of some local parties for peacekeepers' security and role. In the interest of force protection and optimizing operations, a key component of UN PKOs is healthcare and medical treatment. The expectation is that UN PKO medical support will adjust to the general intent and structure of UN PKOs. To do so requires effective policies and planning informed by a review of all medical aspects of UN PKO operations, including those considered supplementary, that is, less crucial but contributing nonetheless. Medical aspects considered paramount and key to UN PKOs have received relatively thorough treatment elsewhere. The intent of this article is to report on ancillary and supplemental medical aspects practical to post-Cold War UN PKO operations assembled through an iterative inquiry of open-source articles. Recommendations are made about possible courses of action in terms of addressing trends found in such medical aspects of PKOs and relevance of US/NATO/European Union models and research.

  18. Lessons learned from accidents in industrial irradiation facilities

    International Nuclear Information System (INIS)

    1996-01-01

    Use of ionizing radiation in medicine, industry and research for technical development continues to increase throughout the world. One application with a high growth rate is irradiation suing high energy gamma photons and electron beams. There are currently more than 160 gamma irradiation facilities and over 600 electron beam facilities in operation in almost all IAEA Member States. The most common uses of these facilities are to sterilize medical and pharmaceutical products, to preserve foodstuffs, to synthesize polymers and to eradicate insects. Although this industry has a good safety record, there is a potential for accidents with serious consequences to human health because of the high dose rates produced by these sources. Fatal accidents have occurred at installations in both developed and developing countries. Such accidents have prompted a review of several accidents, including five with fatalities, by a team of manufacturers, regulatory authorities and operating organizations. Having looked closely at the circumstances of each accident and the apparent deficiencies in design, safety and regulatory systems and personnel performance, the team made a number of recommendations on the ways in which the safety of irradiators can be improved. The findings of extensive research pertaining to the lessons that can be learned from irradiator accidents are presented. This publication is intended for manufacturers, regulatory authorities and operating organizations dealing with industrial irradiators. It was drafted by J.E. Glen, United States Nuclear Regulatory Commission, United States of America, and P. Zuniga-Bello, Consejo Nacional de Ciencia y Technologia, Mexico

  19. CEA's waste management policy and strategy. Lessons learned - 59201

    International Nuclear Information System (INIS)

    Dall'ava, Didier

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Radioactive wastes are generated during operation as well as during the decontamination and dismantling of CEA's nuclear facility/installation. The safe and responsible management of radioactive wastes at all stages is an essential requirement of the regulatory system. The management covers the whole sequence of operations starting with the generation of waste and ending with its disposal. The disposal here means discarding of waste with no intention for retrieval. It is important to note here that the safety principles and practices that are applicable during the operational phase are also applicable during the decommissioning phase. As the radioactive waste arising is an inevitable outcome of decommissioning work, all the regulatory requirements associated with decommissioning remain in force in waste management. This presentation deals initially with the regulatory standards related to the management of wastes. As the management of radioactive wastes inevitably includes treatment and conditioning of wastes, following treatment and conditioning of wastes, storage, transportation and eventual disposal are the logical outcome of the radioactive wastes, processes are at any time improved based on the feedback experience and the lessons learned. (author)

  20. APPLYING LESSONS LEARNED FROM THE UNITED STATES SPECIAL OPERATIONS COMMAND’S HUMAN PERFORMANCE PROGRAM TO THE UNITED STATES AIR FORCES COMPREHENSIVE AIRMAN FITNESS

    Science.gov (United States)

    2016-04-01

    better state of readiness for manning joint sourcing assignments. There is a glass ceiling to the USAF’s physical fitness program’s construct based on... effectiveness of USAF critically manned career fields. A case study framework for comparative analysis of POTFF’s Human Performance Programs in...have huge second and third order effects based on operational requirements to backfill the qualified individual. The investments made into

  1. Licence renewal in the United States - enhancing the process through lessons learned

    International Nuclear Information System (INIS)

    Walters, D.J.

    2000-01-01

    The Nuclear Energy Institute (NEI) is the Washington based policy organisation representing the broad and varied interests of the diverse nuclear energy industry. It comprises nearly 300 corporate members in 15 countries with a budget last year of about USD 26.5 million. It has been working for 10 years with the Nuclear Regulatory Commission (NRC), colleagues in the industry and others to demonstrate that license renewal is a safe and workable process. The first renewed license was issued on 24 March to BGE for the the Calvert Cliffs plant. One month later the NRC issued the renewed license for the Ocoenne plant. By 'Enhancing the process through lessons learned', we mean reducing the uncertainty in the license renewal process. This is achieved through lessons learned from the net wave of applicants and the reviews of the Calvert Cliffs and Ocoenne applications. Three areas will be covered: - Incentive for minimising uncertainty as industry interest in license renewal is growing dramatically. - Rigorous reviews by Nuclear Regulatory Commission assure continued safety: process put in place by the Nuclear Regulatory Commission to assure safety throughout the license renewal term, specifically areas where the lessons learned suggest improvements can be made. - Lessons learned have identified enhancements to the process: numerous benefits associated with renewal of nuclear power plant licenses for consumers of electricity, the environment, the nuclear operating companies and the nation. (author)

  2. Biobehavioral Insights into Adaptive Behavior in Complex and Dynamic Operational Settings: Lessons learned from the Soldier Performance and Effective, Adaptable Response Task

    Directory of Open Access Journals (Sweden)

    Amy J. Haufler

    2018-02-01

    Full Text Available The purpose of this study was to explore the biobehavioral correlates of adaptive behavior in the context of a standardized laboratory-based mission-relevant challenge [the Soldier Performance and Effective, Adaptable Response (SPEAR task]. Participants were 26 healthy male volunteers (M = 34.85 years, SD = 4.12 with active military duty and leadership experience within the last 5 years (i.e., multiple leadership positions, operational deployments in combat, interactions with civilians and partner nation forces on the battlefield, experience making decisions under fire. The SPEAR task simultaneously engages perception, cognition, and action aspects of human performance demands similar to those encountered in the operational setting. Participants must engage with military-relevant text, visual, and auditory stimuli, interpret new information, and retain the commander’s intent in working memory to create a new plan of action for mission success. Time-domain measures of heart period and respiratory sinus arrhythmia (RSA were quantified, and saliva was sampled [later assayed for cortisol and alpha-amylase (sAA] before-, during-, and post-SPEAR. Results revealed a predictable pattern of withdraw and recovery of the cardiac vagal tone during repeated presentation of battlefield challenges. Recovery of vagal inhibition following executive function challenge was strongly linked to better task-related performance. Rate of RSA recovery was also associated with better recall of the commander’s intent. Decreasing magnitude in the skin conductance response prior to the task was positively associated with better overall task-related performance. Lower levels of RSA were observed in participants who reported higher rates of combat deployments, and reduced RSA flexibility was associated with higher rates of casualty exposure. Greater RSA flexibility during SPEAR was associated with greater self-reported resilience. There was no consistent

  3. Denmark's Master of Public Governance Program: Assessment and Lessons Learned

    Science.gov (United States)

    Greve, Carsten; Pedersen, Anne Reff

    2017-01-01

    This paper focuses on Denmark's Master of Public Governance and its assessments and lessons learned. Denmark is seen to have an efficient economy and public sector, a digitalized public service delivery system, and an advanced work-life balance. The Danish government invested substantial resources into developing a Master of Public Governance…

  4. Lessons Learned from Becoming an Independent Standards Board.

    Science.gov (United States)

    Board, John C.

    This paper discusses lessons learned from becoming an independent standards board. It begins by explaining that teachers lacked adequate academic preparation during the two World Wars and shortly thereafter. At the end of World War II, public education had to deal with poor pay, little job security, inadequate pensions, and inadequate and…

  5. Writing Learning Outcomes for English Language Lessons in Multilingual Schools

    Science.gov (United States)

    Jones, Sally Ann

    2016-01-01

    This article proposes a pedagogic innovation in teacher education by articulating a method for writing learning outcomes for English language lessons in multilingual school contexts. The argument for this approach is founded on curriculum studies; however, the practice also draws specifically on applied psycholinguistic and sociolinguistic…

  6. Public perception of radioactive waste management and lessons learned

    International Nuclear Information System (INIS)

    Curd, J.

    1989-01-01

    Information officers from United Kingdom Nirex Ltd have been dealing with one of industry's most intractable public relations programmes for five years. Mistakes have been made but lessons have been learned and are now being applied to the Company's current programme - the deep underground disposal of solid low-level and intermediate-level radioactive waste. (author)

  7. Achieving Balance: Lessons Learned from University and College Presidents

    Science.gov (United States)

    Havice, Pamela A.; Williams, Frankie K.

    2005-01-01

    This study investigated strategies used by college and university presidents in balancing their professional and personal lives. The conceptual framework for this study comes from the work of Schein (1985, 1992). Lessons learned and words of wisdom from these presidents can enhance leadership effectiveness at all levels in higher education.

  8. Teaching about Terrorism: Lessons Learned at SWOTT

    Science.gov (United States)

    Miller, Gregory D.

    2009-01-01

    This article discusses some of the challenges and lessons for teaching undergraduate-level courses related to terrorism. The author outlines some of the primary issues that instructors can expect to face, and provides strategies for dealing with several of these challenges. The goal is to relay useful information to those teaching, or planning to…

  9. Jackie Steals Home. Learning Page Lesson Plan.

    Science.gov (United States)

    Pulda, Arnold

    In this lesson, students draw on their previous studies of American history and culture as they analyze primary sources from "Jackie Robinson and Other Baseball Highlights, 1860s-1960s" in the American Memory collection. A close reading of two documents relating to Jackie Robinson's breaking of the racial barrier in professional baseball…

  10. Lessons Learned from a Consultation Process Overseas

    Science.gov (United States)

    Merino-Soto, César

    2014-01-01

    In this commentary I discuss three international school consultation experiences, highlighting aspects that serve as lessons for professional development and the implementation of effective and helpful strategies that meet the needs of children and youth in school systems. Relationships developed and maintained between the consulting teams and the…

  11. Twain's "Hannibal." Learning Page Lesson Plan.

    Science.gov (United States)

    Wood, Jan; Thiese, Norma

    Writers are influenced by their environment including family, community, lifestyle, or location. One such writer was Mark Twain. With this lesson plan the learner will become familiar with and analyze life around Mark Twain's hometown, Hannibal, Missouri, during the latter half of the 19th century by using various online and print resources to…

  12. Lessons Learned in Student Venture Creation

    Science.gov (United States)

    Caner, Edward

    The Physics Entrepreneurship Master's Program (PEP) at Case Western Reserve University is now in its 15th year of operation. PEP is a 27 credit-hour Master of Science in Physics, Entrepreneurship Track. The curriculum can be tailored to the needs of each student. Coursework consists of graduate-level classes in science, business, intellectual property law, and innovation. A master's thesis is required that is based on a real-world project in innovation or entrepreneurship within an existing company or startup (possibly the student's). PEP faculty help students connect with mentors, advisors, partners, funding sources and job opportunities. In this talk I will chronicle several pitfalls that we have encountered with our ''real world'' student projects and start-up businesses, several of which met their complete demise despite showing great promise for success. I will discuss how we have learned to avoid most of these pitfalls by taking surprisingly simple actions.

  13. Computerisation of procedures. Lessons learned and future perspectives

    International Nuclear Information System (INIS)

    O'Hara, J.; Pirus, D.; Nilsen, S.; Bisio, R.; Hulsund, J.-E.; Zhang, W.

    2003-07-01

    The computerisation of the procedures has been investigated for several years. Even though guidelines for such computerisation have been proposed, there is a need to extend and revise these guidelines. In this report, we look at what has been achieved so far, both within the Halden Project as well as within other organisations related to nuclear power plants. These experiences are often related to testing of particular computerised procedure systems either in research laboratories or in nuclear utilities. These activities have accumulated a body of general knowledge on the subject, as documented in other 'lessons learned' reports of the past. This report will extend this accepted body of knowledge. Furthermore, we identify the unresolved problems that need to be further studied to make usable computerised procedures for the future. The report identifies selected qualities that should be reinforced to make computerised procedure systems better. In particular, the integration aspect is emphasised. A flexible integration with the operator tasks and the remaining interfaces of the control room is important. Unless this integration is accomplished, the computerised procedures will not be functional. Another aspect of integration is combination with other systems inclusive those systems that deal with the plant documentation, electronic or paper based. This kind of integration is important to the safe and reliable operation of the plant. Good integration with plant documentation is instrumental in creating reliable QA of the procedures that covers the whole life cycle of the procedure. (Author). 48 refs., 12 figs., 2 tabs

  14. Nuclear power plant Generic Aging Lessons Learned (GALL). Appendix B

    International Nuclear Information System (INIS)

    Kasza, K.E.; Diercks, D.R.; Holland, J.W.; Choi, S.U.

    1996-12-01

    The purpose of this generic aging lessons learned (GALL) review is to provide a systematic review of plant aging information in order to assess materials and component aging issues related to continued operation and license renewal of operating reactors. Literature on mechanical, structural, and thermal-hydraulic components and systems reviewed consisted of 97 Nuclear Plant Aging Research (NPAR) reports, 23 NRC Generic Letters, 154 Information Notices, 29 Licensee Event Reports (LERs), 4 Bulletins, and 9 Nuclear Management and Resources Council Industry Reports (NUMARC IRs) and literature on electrical components and systems reviewed consisted of 66 NPAR reports, 8 NRC Generic Letters, 111 Information Notices, 53 LERs, 1 Bulletin, and 1 NUMARC IR. More than 550 documents were reviewed. The results of these reviews were systematized using a standardized GALL tabular format and standardized definitions of aging-related degradation mechanisms and effects. The tables are included in volumes 1 and 2 of this report. A computerized data base has also been developed for all review tables and can be used to expedite the search for desired information on structures, components, and relevant aging effects. A survey of the GALL tables reveals that all ongoing significant component aging issues are currently being addressed by the regulatory process. However, the aging of what are termed passive components has been highlighted for continued scrutiny. This report consists of Volume 2, which consists of the GALL literature review tables for the NUMARC Industry Reports reviewed for the report

  15. Lessons learned with ISO 14001 at DOE sites

    Energy Technology Data Exchange (ETDEWEB)

    Wilkinson, C. H., LLNL

    1998-03-01

    ISO 14001 is the international standard for environmental management systems (EMS). The standard applies the `plan, do, check, act` management system model to assure that the environmental impacts of operations are fully considered in planning and facility operations. ISO 14001 has grown in popularity in both the public and the private sector and has seen increasing utility within the U.S. Department of Energy (DOE). While there is no final DOE policy or requirement for ISO 14001 EMS implementation, ISO 14001 commands an active presence at many DOE sites. In general, the impetus for ISO 14001 in the DOE complex has been either an initiative by site management contractors to improve performance, or an actual requirement in the new management contracts for the sites. Several DOE sites now are committed to implement EMS`s in conformance with ISO 14001: Brookhaven National Laboratory (BNL), Hanford, Idaho National Engineering and Environmental Laboratory (INEEL), Kansas City Plant, Nevada Test Site, Savannah River Site (SRS), Waste Isolation Pilot Project (WIPP), West Valley. Several other DOE sites are expected to proceed in the near future with an EMS consistent with ISO 14001. However, not all sites are proceeding with an ISO 14001 EMS based on individual site business considerations. This paper describes the status of EMS implementation at these sites and identifies lessons learned that may be of use to other DOE sites.

  16. MIDAS: Lessons learned from the first spaceborne atomic force microscope

    Science.gov (United States)

    Bentley, Mark Stephen; Arends, Herman; Butler, Bart; Gavira, Jose; Jeszenszky, Harald; Mannel, Thurid; Romstedt, Jens; Schmied, Roland; Torkar, Klaus

    2016-08-01

    The Micro-Imaging Dust Analysis System (MIDAS) atomic force microscope (AFM) onboard the Rosetta orbiter was the first such instrument launched into space in 2004. Designed only a few years after the technique was invented, MIDAS is currently orbiting comet 67P Churyumov-Gerasimenko and producing the highest resolution 3D images of cometary dust ever made in situ. After more than a year of continuous operation much experience has been gained with this novel instrument. Coupled with operations of the Flight Spare and advances in terrestrial AFM a set of "lessons learned" has been produced, cumulating in recommendations for future spaceborne atomic force microscopes. The majority of the design could be reused as-is, or with incremental upgrades to include more modern components (e.g. the processor). Key additional recommendations are to incorporate an optical microscope to aid the search for particles and image registration, to include a variety of cantilevers (with different spring constants) and a variety of tip geometries.

  17. Spill response exercises and lessons learned : a response organization's perspective

    International Nuclear Information System (INIS)

    Taylor, E.; Green, M.

    2001-01-01

    In the past five years, Burrard Clean Operations (BCO) has demonstrated its' oil spill response capabilities through different types of exercises. Such exercises are necessary for certification of Response Organizations in Canada. The exercises can be performed through actual response to spills or through simulated situations. Both can provide an opportunity to practice different levels of response to a range of conditions in various settings. They also provide the opportunity to focus on specific themes that can be part of a response and to identify areas for improvement in response actions. They also make it possible to interface with government agencies, industry and others that participate in spill responses. The exercise program for BCO is aimed at maintaining certification and to assist the Canadian Coast Guard. The exercises broaden the lessons learned and set a course for future enhancement to spill readiness should a real incident occur. The goals of the exercise program are to provide real time drills that show the operational capability of a representative sample of BCO equipment, management and trained spill responders. The response functions of the BCO exercise program are: notification, response organization activation, contractor activation, situation analysis, strategy development for marine oil spill response, site safety, equipment deployment, containment, recovery, shoreline assessment, cleanup, communications, decontamination, logistics, and financial management. The BCO experience has led to the basic conclusions that there is a need to vary the exercise design and format and that there is a need to implement follow-up actions provided during exercise evaluations. 7 refs., 3 tabs

  18. Lessons learned from HRA and human-system modeling efforts

    International Nuclear Information System (INIS)

    Hallbert, B.P.

    1993-01-01

    Human-System modeling is not unique to the field of Human Reliability Analysis (HRA). Since human factors professionals first began their explorations of human activities, they have done so with the concept of open-quotes systemclose quotes in mind. Though the two - human and system - are distinct, they can be properly understood only in terms of each other: the system provides a context in which goals and objectives for work are defined, and the human plays either a pre-defined or ad hoc role in meeting these goals. In this sense, every intervention which attempts to evaluate or improve upon some system parameter requires that an understanding of human-system interactions be developed. It is too often the case, however, that somewhere between the inception of a system and its implementation, the human-system relationships are overlooked, misunderstood, or inadequately framed. This results in mismatches between demands versus capabilities of human operators, systems which are difficult to operate, and the obvious end product-human error. The lessons learned from human system modeling provide a valuable feedback mechanism to the process of HRA, and the technologies which employ this form of modeling

  19. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    Nirider, L. Tom

    2003-08-06

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D&D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D&D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D&D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D&D activities. A reference section is included to provide additional information. This document does not address D&D lessons learned that are not pertinent to criticality safety.

  20. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2003-01-01

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D and D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D and D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D and D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D and D activities. A reference section is included to provide additional information. This document does not address D and D lessons learned that are not pertinent to criticality safety

  1. Paper-Based Medical Records: the Challenges and Lessons Learned from Studying Obstetrics and Gynaecological Post-Operation Records in a Nigerian Hospital

    Directory of Open Access Journals (Sweden)

    Adekunle Yisau Abdulkadir

    2010-10-01

    Full Text Available AIM: With the background knowledge that auditing of Medical Records (MR for adequacy and completeness is necessary if it is to be useful and reliable in continuing patient care; protection of the legal interest of the patient, physicians, and the Hospital; and meeting requirements for researches, we scrutinized theatre records of our hospital to identify routine omissions or deficiencies, and correctable errors in our MR system. METHOD: Obstetrics and Gynaecological post operation theatre records between January 2006 and December 2008 were quantitatively and qualitatively analyzed for details that included: hospital number; Patients age; diagnosis; surgery performed; types and modes of anesthesia; date of surgery; patients’ ward; Anesthetists names; surgeons and attending nurses names, and abbreviations used with SPSS 15.0 for Windows. RESULTS: Hardly were any of the 1270 surgeries during the study period documented without an omission or an abbreviation. Hospital numbers and patients’ age were not documented in 21.8% (n=277 and 59.1% (n=750 respectively. Diagnoses and surgeries were recorded with varying abbreviations in about 96% of instances. Surgical team names were mostly abbreviated or initials only given. CONCLUSION: To improve the quality of Paper-based Medical Record, regular auditing, training and good orientation of medical personnel for good record practices, and discouraging large volume record book to reduce paper damages and sheet loss from handling are necessary else what we record toady may neither be useful nor available tomorrow. [TAF Prev Med Bull 2010; 9(5.000: 427-432

  2. Head and neck trauma in Iraq and Afghanistan: different war, different surgery, lessons learned.

    Science.gov (United States)

    Brennan, Joseph

    2013-10-01

    The objectives are to compare and contrast the head and neck trauma experience in Iraq and Afghanistan and to identify trauma lessons learned that are applicable to civilian practice. A retrospective review of one head and neck surgeon's operative experience in Iraq and Afghanistan was performed using operative logs and medical records. The surgeon's daily operative log book with patient demographic data and operative reports was reviewed. Also, patient medical records were examined to identify the preoperative and postoperative course of care. The head and neck trauma experiences in Iraq and Afghanistan were very different, with a higher percentage of emergent cases performed in Iraq. In Iraq, only 10% of patients were pretreated at a facility with surgical capabilities. In Afghanistan, 93% of patients were pretreated at such facilities. Emergent neck exploration for penetrating neck trauma and emergent airway surgery were more common in Iraq, which most likely accounted for the increased perioperative mortality also seen in Iraq (5.3% in Iraq vs. 1.3% in Afghanistan). Valuable lessons regarding soft tissue trauma repair, midface fracture repair, and mandible fracture repair were learned. The head and neck trauma experiences in Iraq and Afghanistan were very different, and the future training for mass casualty trauma events should reflect these differences. Furthermore, valuable head and neck trauma lessons learned in both war zones are applicable to the civilian practice of trauma. Level 4. Copyright © 2013 The American Laryngological, Rhinological and Otological Society, Inc.

  3. Applying the Science of Science Communication to Climate Change and Clean Energy: Lessons Learned from the NSF- and PBS-supported "Earth: The Operators' Manual"

    Science.gov (United States)

    Haines-Stiles, G.; Akuginow, E.; Sanford, C.

    2014-12-01

    Yale legal scholar and professor of psychology Dan Kahan has criticized the climate change science community for not applying what's known about effective communications strategies to topics with potentially controversial content. "Earth: The Operators' Manual," funded by NSF's Informal Science Education program and appearing on PBS was hosted by Penn State geoscientist Richard Alley. From the initial proposal forward into airing on public television in 2011 and 2012, ETOM aimed to be authoritative and apolitical while still being engaging to general audiences. Based on social scientific insights from project Advisor, Suzanne Moser, and others, ETOM aimed to avoid "climate porn" scare tactics and over-used footage, and to enlist a diverse group of "messengers" in addition to Alley. An important design criterion was to give equal time to clean energy solutions while pulling no punches as to the consensus findings of leading climate scientists. With the ETOM project now completed and final reports submitted to NSF, what results can be shared to inform future efforts? And how did ETOM compare in audience impact with other major media efforts such as Al Gore's "An Inconvenient Truth" or Showtime's more recent "Years of Living Dangerously"? Results reported draw on the external evaluation by Rockman Et Al, and include both quantitative and qualitative data. Key findings are the importance of including Texan ranchers enthusiastic about wind power alongside Navy Admirals adamant that climate change is human-caused and Marines implementing solar energy to reduce casualties incurred while transporting fossil fuels. In-person presentations by Alley and others at science centers served as de facto focus groups for scripting the TV programs, along with actual focus groups convened by Rockman. The 3rd program, ENERGY QUEST USA, documented 5 quite different communities, from Alaska to Forth Worth, Baltimore, Portland and Kansas, all using competition, local values, and economic

  4. Lessons learned from the NREL village power program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.W. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NREL`s recent experiences and lessons learned.

  5. Lessons Learned from the NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.

    1998-07-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NRELs recent experiences and lessons learned.

  6. Lessons learned in terms of crisis management

    International Nuclear Information System (INIS)

    2006-01-01

    This document outlines that nobody was prepared to the crisis which occurred after the Chernobyl accident, whether in Russia, Europe or France. In order to illustrate the fact that crisis management has been different from one country to another, the report describes how the crisis has been managed in Norway (which has been quickly reached by fallouts and with a rather high level) and in Switzerland. It comments radioactivity measurements performed in France during spring 1986 by the SCPRI, the CEA and the ISPN. It discusses the lessons drawn in France in terms of emergency situation management regarding the protection of the population, crisis management, and the French post-accidental doctrine. It comments the lessons drawn in eastern European countries, with the cooperative implication of the IRSN. International projects are evoked: the Chernobyl Centre, the French-German Initiative, the European projects (EURANOS, NERIS, FARMING, STRATEGY, MOSES and SAMEN)

  7. Learning Lessons from TMI to Fukushima and Other Industrial Accidents: Keys for Assessing Safety Management Practices

    International Nuclear Information System (INIS)

    Dechy, N.; Rousseau, J.-M.; Dien, Y.; Montmayeul, R.; Llory, M.

    2016-01-01

    The main objective of the paper is to discuss and to argue about transfer, from an industrial sector to another industrial sector, of lessons learnt from accidents. It will be achieved through the discussion of some theoretical foundations and through the illustration of examples of application cases in assessment of safety management practices in Nuclear Power Plant (NPP). The nuclear energy production industry has faced three big ones in 30 years (TMI, Chernobyl, Fukushima) involving three different reactor technologies operated in three quite different cultural, organizational and regulatory contexts. Each of those accident has been the origin of questions, but also generator of lessons, some changing the worldview (see Wilpert and Fahlbruch, 1998) of what does cause an accident in addition to the engineering view about the importance of technical failures (human error, safety culture, sociotechnical interactions). Some of their main lessons were implemented such as improvements of human-machine interfaces ergonomics, recast of some emergency operating procedures, severe accident mitigation strategies and crisis management. Some lessons did not really provide deep changes. It is the case for organizational lessons such as, organizational complexity, management of production pressures, regulatory capture, and failure to learn, etc.

  8. International Space Station Passive Thermal Control System Analysis, Top Ten Lessons-Learned

    Science.gov (United States)

    Iovine, John

    2011-01-01

    The International Space Station (ISS) has been on-orbit for over 10 years, and there have been numerous technical challenges along the way from design to assembly to on-orbit anomalies and repairs. The Passive Thermal Control System (PTCS) management team has been a key player in successfully dealing with these challenges. The PTCS team performs thermal analysis in support of design and verification, launch and assembly constraints, integration, sustaining engineering, failure response, and model validation. This analysis is a significant body of work and provides a unique opportunity to compile a wealth of real world engineering and analysis knowledge and the corresponding lessons-learned. The analysis lessons encompass the full life cycle of flight hardware from design to on-orbit performance and sustaining engineering. These lessons can provide significant insight for new projects and programs. Key areas to be presented include thermal model fidelity, verification methods, analysis uncertainty, and operations support.

  9. Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen; Workshop Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. W.; McQueen, S.; Brinch, J.

    2008-07-01

    DOE sponsored the Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen workshop to understand how lessons from past experiences can inform future efforts to commercialize hydrogen vehicles. This report contains the proceedings from the workshop.

  10. Co-Creation Learning Procedures: Comparing Interactive Language Lessons for Deaf and Hearing Students.

    Science.gov (United States)

    Hosono, Naotsune; Inoue, Hiromitsu; Tomita, Yutaka

    2017-01-01

    This paper discusses co-creation learning procedures of second language lessons for deaf students, and sign language lessons by a deaf lecturer. The analyses focus on the learning procedure and resulting assessment, considering the disability. Through questionnaires ICT-based co-creative learning technologies are effective and efficient and promote spontaneous learning motivation goals.

  11. Lessons from Learning to Have Rational Expectations

    OpenAIRE

    Lindh, Thomas

    1989-01-01

    This paper reviews a growing literature investigating how economic agents may learn rational expectations. Fully rational learning requires implausible initial information assumptions, therefore some form of bounded rationality has come into focus. Such learning models often converge to rational expectations equilibria within certain bounds. Convergence analysis has been much simplified by methods from adaptive control theory. Learning stability as a correspondence principle show some promise...

  12. Influences of Multimedia Lesson Contents On Effective Learning

    Directory of Open Access Journals (Sweden)

    Tuncay Yavuz Ozdemir

    2013-11-01

    Full Text Available In the information era that we experience today, there is a rapid change in the methods, techniques and materials used for education and teaching. The usage of information and communication technology-assisted teaching materials are becoming more commonplace. Parallel to these developments, the Ministry of National Education took steps to develop IT substructures of all schools in the country and implemented many projects. The purpose of this study is to determine whether or not the multimedia lesson content used by teachers affect effective learning. This study is a qualitative study, conducted with 45 teachers working in primary schools during the 2011-2012 academic year. According to the study findings, participants believe that using multimedia lesson content during lectures increases student motivation, makes students more curious and interested, and think that using multimedia lesson content has positive effects.

  13. Addressing the Challenges of Sharing Lessons Learned Amongst Suppliers in a Fragmented and Competitive Marketplace

    International Nuclear Information System (INIS)

    Dennier, D.

    2016-01-01

    Historically, COG member utilities largely drew from in-house supporting functions or the original plant designers, allowing active sharing of operational and human performance experience amongst a small number of relevant parties. As the industry has evolved, utilities have increasingly drawn upon a greater number of independent external suppliers to provide goods and services. This diversification in supplier base within a competitive environment changes operating dynamics, as a safety culture-focused supplier must remain mindful of developing and retaining competitive advantages over other suppliers. A market-driven perspective may undermine the likelihood of sharing certain lessons learned and best practices for fear of weakening competitive position. Utility procurement procedures must ensure fair markets to be effective, but in doing so may limit opportunity for collaboration between supplier and utility compared to historic levels. Vibrant competitive markets attract a large number of suppliers, which adds to the complexity of effective sharing and absorption of industry lessons learned. This paper will explain the activities underway through the COG Supplier Participant program to remove impediments and share industry-wide operational lessons learned and best practices. (author)

  14. Integrating self-regulated learning and discovery learning into English lesson plan

    Directory of Open Access Journals (Sweden)

    Sayukti Ni Kadek Heny

    2018-01-01

    Full Text Available The notion of learner-centeredness has been embedded in the National Curriculum of Indonesia, 2013 Curriculum. However, most of the teachers seem to be hardly acquainted with the concept of Self-Regulated Learning (SRL and discovery learning in the lesson planning. Considering the phenomenon, this study intends to explore the concept of Self-Regulated Learning in the lesson plan of English subject for a tenth-grade level by employing a qualitative design with data obtained from a teacher-made lesson plan and a semi-structured interview. The researcher used content analysis to analyze the lesson plan. Meanwhile, the qualitative data from interview result were preceded through a coding sheet and transcribed modified figure. The findings revealed an integration of SRL cyclical phase and discovery learning in the teacher-made lesson plan. Based on the discussion, the results need to be applied in a considerably large context, in order to see thoroughly dynamic integration between Self-Regulated Learning model, lesson planning and the concept of learner autonomy.

  15. Lessons learned from recent geomagnetic disturbance model validation activities

    Science.gov (United States)

    Pulkkinen, A. A.; Welling, D. T.

    2017-12-01

    Due to concerns pertaining to geomagnetically induced current impact on ground-based infrastructure, there has been significantly elevated interest in applying models for local geomagnetic disturbance or "delta-B" predictions. Correspondingly there has been elevated need for testing the quality of the delta-B predictions generated by the modern empirical and physics-based models. To address this need, community-wide activities were launched under the GEM Challenge framework and one culmination of the activities was the validation and selection of models that were transitioned into operations at NOAA SWPC. The community-wide delta-B action is continued under the CCMC-facilitated International Forum for Space Weather Capabilities Assessment and its "Ground Magnetic Perturbations: dBdt, delta-B, GICs, FACs" working group. The new delta-B working group builds on the past experiences and expands the collaborations to cover the entire international space weather community. In this paper, we discuss the key lessons learned from the past delta-B validation exercises and lay out the path forward for building on those experience under the new delta-B working group.

  16. Provider-Sponsored Health Plans: Lessons Learned over Three Decades.

    Science.gov (United States)

    Breon, Richard C

    2016-01-01

    Healthcare's movement to value-based care is causing health systems across the country to consider whether owning or partnering with a health plan could benefit their organizations. Although organizations have different reasons for wanting to enter the insurance business, potential benefits include improving care quality, lowering costs, managing population health, expanding geographic reach, and diversifying the organization's revenue stream. However, the challenges and risks of owning a health plan are formidable: Assuming 100 percent financial risk for a patient population requires considerable financial resources, as well as competencies that are wholly different from those needed to run a hospital or physician group. For Spectrum Health, an integrated, not-for-profit health system based in Grand Rapids, Michigan, owning a health plan has been vital to fulfilling its mission of improving the health of the communities it serves, as well as its value proposition of providing highquality care at lower costs. This article weighs the pros and cons of operating a health plan; explores key business factors and required competencies that organizations need to consider when deciding whether to buy, build, or partner; examines the current environment for provider-sponsored health plans; and shares some of the lessons Spectrum Health has learned over three decades of running its health plan, Priority Health.

  17. SAGE III on ISS Lessons Learned on Thermal Interface Design

    Science.gov (United States)

    Davis, Warren

    2015-01-01

    The Stratospheric Aerosol and Gas Experiment III (SAGE III) instrument - the fifth in a series of instruments developed for monitoring vertical distribution of aerosols, ozone, and other trace gases in the Earth's stratosphere and troposphere - is currently scheduled for delivery to the International Space Station (ISS) via the SpaceX Dragon vehicle in 2016. The Instrument Adapter Module (IAM), one of many SAGE III subsystems, continuously dissipates a considerable amount of thermal energy during mission operations. Although a portion of this energy is transferred via its large radiator surface area, the majority must be conductively transferred to the ExPRESS Payload Adapter (ExPA) to satisfy thermal mitigation requirements. The baseline IAM-ExPA mechanical interface did not afford the thermal conductance necessary to prevent the IAM from overheating in hot on-orbit cases, and high interfacial conductance was difficult to achieve given the large span between mechanical fasteners, less than stringent flatness specifications, and material usage constraints due to strict contamination requirements. This paper will examine the evolution of the IAM-ExPA thermal interface over the course of three design iterations and will include discussion on design challenges, material selection, testing successes and failures, and lessons learned.

  18. AECL's underground research laboratory: technical achievements and lessons learned

    International Nuclear Information System (INIS)

    Ohta, M.M.; Chandler, N.A.

    1997-03-01

    During the development of the research program for the Canadian Nuclear Fuel Waste Management Program in the 1970's, the need for an underground facility was recognized. AECL constructed an Underground Research Laboratory (URL) for large-scale testing and in situ engineering and performance-assessment-related experiments on key aspects of deep geological disposal in a representative geological environment. Ale URL is a unique geotechnical research and development facility because it was constructed in a previously undisturbed portion of a granitic pluton that was well characterized before construction began, and because most of the shaft and experimental areas are below the water table. The specific areas of research, development and demonstration include surface and underground characterization; groundwater and solute transport; in situ rock stress conditions; temperature and time-dependent deformation and failure characteristics of rock; excavation techniques to minimize damage to surrounding rock and to ensure safe working conditions; and the performance of seals and backfills. This report traces the evolution of the URL and summarizes the technical achievements and lessons learned during its siting, design and construction, and operating phases over the last 18 years. (author)

  19. Warfighter information services: lessons learned in the intelligence domain

    Science.gov (United States)

    Bray, S. E.

    2014-05-01

    A vision was presented in a previous paper of how a common set of services within a framework could be used to provide all the information processing needs of Warfighters. Central to that vision was the concept of a "Virtual Knowledge Base". The paper presents an implementation of these ideas in the intelligence domain. Several innovative technologies were employed in the solution, which are presented and their benefits explained. The project was successful, validating many of the design principles for such a system which had been proposed in earlier work. Many of these principles are discussed in detail, explaining lessons learned. The results showed that it is possible to make vast improvements in the ability to exploit available data, making it discoverable and queryable wherever it is from anywhere within a participating network; and to exploit machine reasoning to make faster and better inferences from available data, enabling human analysts to spend more of their time doing more difficult analytical tasks rather than searching for relevant data. It was also demonstrated that a small number of generic Information Processing services can be combined and configured in a variety of ways (without changing any software code) to create "fact-processing" workflows, in this case to create different intelligence analysis capabilities. It is yet to be demonstrated that the same generic services can be reused to create analytical/situational awareness capabilities for logistics, operations, planning or other military functions but this is considered likely.

  20. License renewal demonstration program: NRC observations and lessons learned

    International Nuclear Information System (INIS)

    Prato, R.J.; Kuo, P.T.; Newberry, S.F.

    1996-12-01

    This report summarizes the Nuclear Regulatory Commission staff's observations and lessons learned from the five License Renewal Demonstration Program (LRDP) site visits performed by the staff from March 25, 1996, through August 16, 1996. The LRDP was a Nuclear Energy Institute (NEI) program intended to assess the effectiveness of the guidance provided by NEI 95-10, Revision 0, open-quotes Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,close quotes to implement the requirements of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), open-quotes Requirements for Renewal of Operating Licenses for Nuclear Power Plants.close quotes In general, NEI 95-10 appeared to contain the basic guidance needed for scoping, screening, identifying aging effects, developing aging management programs, and performing time-limited aging analyses. However, inconsistent implementation of this guidance in some areas was an indication that clarification of existing guidance and/or the inclusion-of some new guidance may be needed for applicants to develop a license renewal program that is consistent with the intent of the rule

  1. Lessons learned from first generation nuclear plant probabalistic risk assessments

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1984-01-01

    The paper by Garrick summarizes the state-of-the-art in what are perhaps the most archetypical probabilistic risk assessments (PRAs). Because of its unique regulatory environment and because of the high levels of perceived (not necessarily actual) risk, the nuclear industry more than any other has been concerned with quantitative risk analysis. Garrick's paper summarizes the lessons learned from ten PRA's conducted in the nuclear industry, including six that can be characterized as full-scope risk studies. Most of the quantitative data, though, came from two especially thorough studies done for the Zion and Indian Point power plants, operated by Commonwealth Edison and Consolidated Edison respectively. The principal conclusions of the Garrick survey are that the public risk (from radiation release) is now known to be very small for commercial nuclear power plants, but that the risk to utilities (from core damage) is somewhat larger. Significant radiation releases require both core meltdown -- an event occurring only about once every 10,000 reactor-years -- and containment failure, occurring only about once in every hundred meltdowns

  2. Lessons learned from fatique failures in major FWR components

    International Nuclear Information System (INIS)

    Ware, A.G.; Shah, V.N.

    1992-01-01

    This paper evaluates the field fatigue failure experience and describes the lessons learned that can be employed in managing fatigue damage at the sites of these failures and at other susceptible sites. Fatigue damage has resulted in cracks on the inside surfaces of vessels and piping, and in some cases, through-wall cracks resulting in coolant leakage. All of the fatigue failures resulted from conditions or stressors that were not accounted for in the original design analyses. In some cases, it has proven difficult to discover fatigue cracks using conventional inservice inspection methods; several cracks were detected because of leakage. Supplementary monitoring and inspection techniques such as fatigue monitoring, acoustic emission monitoring, and time-of-flight-diffraction ultrasonic testing can be used to assist in identifying susceptible sites, estimating crack growth, and sizing existing fatigue cracks. It is important to identify the root cause of failures because once the stressors and degradation mechanisms are known, changes in operating procedures and designs can be implemented to mitigate future fatigue damage

  3. Lessons learned from the MIT Tara control and data system

    International Nuclear Information System (INIS)

    Gaudreau, M.P.J.; Sullivan, J.D.; Fredian, T.W.; Irby, J.H.; Karcher, C.A.; Rameriz, R.A.; Sevillano, E.; Stillerman, J.A.; Thomas, P.

    1987-10-01

    The control and data system of the MIT Tara Tandem Mirror has worked successfully throughout the lifetime of the experiment (1983 through 1987). As the Tara project winds down, it is appropriate to summarize the lessons learned from the implementation and operation of the control and data system over the years and in its final form. The control system handled ∼2400 I/0 points in real time throughout the 5 to 10 minute shot cycle while the data system, in near real time, handled ∼1000 signals with a total of 5 to 7 Mbytes of data each shot. The implementation depended upon a consistent approach based on separating physics and engineering functions and on detailed functional diagrams with narrowly defined cross communication. This paper is a comprehensive treatment of the principal successes, residual problems, and dilemmas that arose from the beginning until the final hardware and software implementation. Suggestions for future systems of either similar size or of larger scale such as CIT are made in the conclusion. 11 refs., 1 fig

  4. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  5. Lessons Learned from PR and PP Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Bley, D.C. [Buttonwood Consulting, Inc., 11738 English Mill Court, Oakton, VA 22124 (United States)

    2009-06-15

    proliferant state. Several of our PR measures proved difficult to evaluate and led to some confusion between which are intrinsic and which are extrinsic. A unifying idea affecting several of our measures appears helpful: every nuclear energy system is embedded in a soft system (state owning it and operator running it, inspectors checking it, etc.), which in its turn is placed within a given context (political situation). The overall proliferation resistance comes from the interaction of these layers, and therefore it is not just an intrinsic characteristic of an engineering asset. An example from this point of view, offers a useful clarification: technical difficulty is an intrinsic measure in the sense that no matter which soft system and context we are dealing with, the would-be proliferator will have to make technical modifications to the system to reach his goals. PP Lessons Learned. For theft and sabotage scenarios response time is key, as well as insider cooperation. The methodology and measures were effective in supporting the analysis and generating useful and unambiguous results. PP measures have undergone significant adaptation and revision in earlier applications studies. The paper will describe anticipated improvements to the methodology, resulting from the Case Study. Note: This paper is planned to be part of a series of sessions on PR and PP being organized by Bob Bari. (author)

  6. Lessons Learned From 104 Years of Mobile Observatories

    Science.gov (United States)

    Miller, S. P.; Clark, P. D.; Neiswender, C.; Raymond, L.; Rioux, M.; Norton, C.; Detrick, R.; Helly, J.; Sutton, D.; Weatherford, J.

    2007-12-01

    As the oceanographic community ventures into a new era of integrated observatories, it may be helpful to look back on the era of "mobile observatories" to see what Cyberinfrastructure lessons might be learned. For example, SIO has been operating research vessels for 104 years, supporting a wide range of disciplines: marine geology and geophysics, physical oceanography, geochemistry, biology, seismology, ecology, fisheries, and acoustics. In the last 6 years progress has been made with diverse data types, formats and media, resulting in a fully-searchable online SIOExplorer Digital Library of more than 800 cruises (http://SIOExplorer.ucsd.edu). Public access to SIOExplorer is considerable, with 795,351 files (206 GB) downloaded last year. During the last 3 years the efforts have been extended to WHOI, with a "Multi-Institution Testbed for Scalable Digital Archiving" funded by the Library of Congress and NSF (IIS 0455998). The project has created a prototype digital library of data from both institutions, including cruises, Alvin submersible dives, and ROVs. In the process, the team encountered technical and cultural issues that will be facing the observatory community in the near future. Technological Lessons Learned: Shipboard data from multiple institutions are extraordinarily diverse, and provide a good training ground for observatories. Data are gathered from a wide range of authorities, laboratories, servers and media, with little documentation. Conflicting versions exist, generated by alternative processes. Domain- and institution-specific issues were addressed during initial staging. Data files were categorized and metadata harvested with automated procedures. With our second-generation approach to staging, we achieve higher levels of automation with greater use of controlled vocabularies. Database and XML- based procedures deal with the diversity of raw metadata values and map them to agreed-upon standard values, in collaboration with the Marine Metadata

  7. Improving the quality of learning in science through optimization of lesson study for learning community

    Science.gov (United States)

    Setyaningsih, S.

    2018-03-01

    Lesson Study for Learning Community is one of lecturer profession building system through collaborative and continuous learning study based on the principles of openness, collegiality, and mutual learning to build learning community in order to form professional learning community. To achieve the above, we need a strategy and learning method with specific subscription technique. This paper provides a description of how the quality of learning in the field of science can be improved by implementing strategies and methods accordingly, namely by applying lesson study for learning community optimally. Initially this research was focused on the study of instructional techniques. Learning method used is learning model Contextual teaching and Learning (CTL) and model of Problem Based Learning (PBL). The results showed that there was a significant increase in competence, attitudes, and psychomotor in the four study programs that were modelled. Therefore, it can be concluded that the implementation of learning strategies in Lesson study for Learning Community is needed to be used to improve the competence, attitude and psychomotor of science students.

  8. Globalizing Lessons Learned from Regional-scale Observatories

    Science.gov (United States)

    Glenn, S. M.

    2016-02-01

    The Mid Atlantic Regional Association Coastal Ocean Observing System (MARACOOS) has accumulated a decade of experience designing, building and operating a Regional Coastal Ocean Observing System for the U.S. Integrated Ocean Observing System (IOOS). MARACOOS serves societal goals and supports scientific discovery at the scale of a Large Marine Ecosystem (LME). Societal themes include maritime safety, ecosystem decision support, coastal inundation, water quality and offshore energy. Scientific results that feed back on societal goals with better products include improved understanding of seasonal transport pathways and their impact on phytoplankton blooms and hypoxia, seasonal evolution of the subsurface Mid Atlantic Cold Pool and its impact on fisheries, biogeochemical transformations in coastal plumes, coastal ocean evolution and impact on hurricane intensities, and storm sediment transport pathways. As the global ocean observing requirements grow to support additional societal needs for information on fisheries and aquaculture, ocean acidification and deoxygenation, water quality and offshore development, global observing will necessarily evolve to include more coastal observations and forecast models at the scale of the world's many LMEs. Here we describe our efforts to share lessons learned between the observatory operators at the regional-scale of the LMEs. Current collaborators are spread across Europe, and also include Korea, Indonesia, Australia, Brazil and South Africa. Specific examples include the development of a world standard QA/QC approach for HF Radar data that will foster the sharing of data between countries, basin-scale underwater glider missions between internationally-distributed glider ports to developed a shared understanding of operations and an ongoing evaluation of the global ocean models in which the regional models for the LME will be nested, and joint training programs to develop the distributed teams of scientists and technicians

  9. Safety and Mission Assurance for In-House Design Lessons Learned from Ares I Upper Stage

    Science.gov (United States)

    Anderson, Joel M.

    2011-01-01

    This viewgraph presentation identifies lessons learned in the course of the Ares I Upper Stage design and in-house development effort. The contents include: 1) Constellation Organization; 2) Upper Stage Organization; 3) Presentation Structure; 4) Lesson-Importance of Systems Engineering/Integration; 5) Lesson-Importance of Early S&MA Involvement; 6) Lesson-Importance of Appropriate Staffing Levels; 7) Lesson-Importance S&MA Team Deployment; 8) Lesson-Understanding of S&MA In-Line Engineering versus Assurance; 9) Lesson-Importance of Close Coordination between Supportability and Reliability/Maintainability; 10) Lesson-Importance of Engineering Data Systems; 11) Lesson-Importance of Early Development of Supporting Databases; 12) Lesson-Importance of Coordination with Safety Assessment/Review Panels; 13) Lesson-Implementation of Software Reliability; 14) Lesson-Implementation of S&MA Technical Authority/Chief S&MA Officer; 15) Lesson-Importance of S&MA Evaluation of Project Risks; 16) Lesson-Implementation of Critical Items List and Government Mandatory Inspections; 17) Lesson-Implementation of Critical Items List Mandatory Inspections; 18) Lesson-Implementation of Test Article Safety Analysis; and 19) Lesson-Importance of Procurement Quality.

  10. TMI-2 Lessons Learned Task Force status report and short-term recommendations

    International Nuclear Information System (INIS)

    1979-07-01

    Review of the Three Mile Island accident by the TMI-2 Lessons Learned Task Force has disclosed a number of actions in the areas of design and analysis and plant operations that the Task Force recommends be required in the short term to provide substantial additional protection which is required for the public health and safety. All nuclear power plants in operation or in various stages of construction or licensing action are affected to varying degrees by the specific recommendations. The Task Force is continuing work in areas of general safety criteria, systems design requirements, nuclear power plant operations, and nuclear power plant licensing

  11. Transport safety and struggle against malevolent acts: a synergy to be developed - Protecting transports against malevolent acts, Synergies between security and safety: lessons learned from the IAEA international conference, Role of the IRSN transport operational level in the field of safety, Transparency and secret in the field of nuclear material transport

    International Nuclear Information System (INIS)

    Riac, Christian; Flory, Denis; Loiseau, Olivier; Mermaz, Frederic; Demolins, Laurent

    2012-01-01

    The first article proposes an interview with the chief of the security department within the French ministry of Ecology, Sustainable Development, Transports and Housing who comments his missions and his relationships with the ASN and the French Home Office for the protection and control of nuclear materials. A second article discusses the lessons learned from an IAEA international conference about the relationship between the approaches to security and to safety. The third article briefly describes the role of the IRSN transport operational level in the field of safety. The last article discusses how opposite notions like transparency and secret are managed in the case of nuclear material transport

  12. Summary of Planned Implementation for the HTGR Lessons Learned Applicable to the NGNP

    International Nuclear Information System (INIS)

    Mckirdy, Ian

    2011-01-01

    This document presents a reconciliation of the lessons learned during a 2010 comprehensive evaluation of pertinent lessons learned from past and present high temperature gas-cooled reactors that apply to the Next Generation Nuclear Plant Project along with current and planned activities. The data used are from the latest Idaho National Laboratory research and development plans, the conceptual design report from General Atomics, and the pebble bed reactor technology readiness study from AREVA. Only those lessons related to the structures, systems, and components of the Next Generation Nuclear Plant (NGNP), as documented in the recently updated lessons learned report are addressed. These reconciliations are ordered according to plant area, followed by the affected system, subsystem, or component; lesson learned; and finally an NGNP implementation statement. This report (1) provides cross references to the original lessons learned document, (2) describes the lesson learned, (3) provides the current NGNP implementation status with design data needs associated with the lesson learned, (4) identifies the research and development being performed related to the lesson learned, and (5) summarizes with a status of how the lesson learned has been addressed by the NGNP Project.

  13. Buried Waste Integrated Demonstration lessons learned: 1993 technology demonstrations

    International Nuclear Information System (INIS)

    Kostelnik, K.M.; Owens, K.J.

    1994-01-01

    An integrated technology demonstration was conducted by the Buried Waste Integrated Demonstration (BWID) at the Idaho National Engineering Laboratory Cold Test Pit in the summer of 1993. This program and demonstration was sponsored by the US Department of Energy Office of Technology Development. The demonstration included six technologies representing a synergistic system for the characterization and retrieval of a buried hazardous waste site. The integrated technology demonstration proved very successful and a summary of the technical accomplishments is presented. Upon completion of the integrated technology demonstration, cognizant program personnel participated in a lessons learned exercise. This exercise was conducted at the Simplot Decision Support Center at Idaho State University and lessons learned activity captured additional information relative to the integration of technologies for demonstration purposes. This information will be used by BWID to enhance program planning and strengthen future technology demonstrations

  14. Wikiwijs: An unexpected journey and the lessons learned towards OER

    Directory of Open Access Journals (Sweden)

    Robert Schuwer

    2014-04-01

    Full Text Available The Dutch Ministry of Education, Culture and Science has funded a five years program to encourage the use, creation and sharing of Open Educational Resources (OER by teachers from various types of education. This program is known as Wikiwijs. Ultimo 2013, the program has come to an end. As some of the assumptions at the start of Wikiwijs proved to work out in unexpected ways the lessons learned could fuel the next steps in developing Wikiwijs. Besides, other national initiatives on opening up education may also benefit from the lessons learned reported here. The main conclusion from five years Wikiwijs was that to accomplish mainstreaming OER, the Wikiwijs program should go along with other interventions that are more oriented toward prescriptive policies and regulations. In particular: the Dutch government should be more directive in persuading executive boards and teachers on schools to adopt OER as an important part of educational reform and the acquisition of 21st century skills.

  15. LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)

    Energy Technology Data Exchange (ETDEWEB)

    Noonan, Christine F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Henry, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Corley, Courtney D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-01-14

    The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this document to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.

  16. QA lessons learned for parameter control from the WIPP Project

    International Nuclear Information System (INIS)

    Richards, R.R.

    1998-01-01

    This paper provides a summary of lessons learned from experiences on the Waste Isolation Pilot Plant (WJPP) Project in implementation of quality assurance controls surrounding inputs for performance assessment analysis. Since the performance assessment (PA) process is inherent in compliance determination for any waste repository, these lessons-learned are intended to be useful to investigators, analysts, and Quality Assurance (QA) practitioners working on high level waste disposal projects. On the WIPP Project, PA analyses for regulatory-compliance determination utilized several inter-related computer programs (codes) that mathematically modeled phenomena such as radionuclide release, retardation, and transport. The input information for those codes are the parameters that are the subject of this paper. Parameters were maintained in a computer database, which was then queried electronically by the PA codes whenever input was needed as the analyses were run

  17. MODIS Science Algorithms and Data Systems Lessons Learned

    Science.gov (United States)

    Wolfe, Robert E.; Ridgway, Bill L.; Patt, Fred S.; Masuoka, Edward J.

    2009-01-01

    For almost 10 years, standard global products from NASA's Earth Observing System s (EOS) two Moderate Resolution Imaging Spectroradiometer (MODIS) sensors are being used world-wide for earth science research and applications. This paper discusses the lessons learned in developing the science algorithms and the data systems needed to produce these high quality data products for the earth sciences community. Strong science team leadership and communication, an evolvable and scalable data system, and central coordination of QA and validation activities enabled the data system to grow by two orders of magnitude from the initial at-launch system to the current system able to reprocess data from both the Terra and Aqua missions in less than a year. Many of the lessons learned from MODIS are already being applied to follow-on missions.

  18. E-LEARNING FROM NATURE THROUGH E-LESSONS

    Directory of Open Access Journals (Sweden)

    Anca Cristina COLIBABA

    2017-08-01

    Full Text Available The article is a study based on the e-Learning from Nature project (2015-1-IT02-KA201-015133 funded by the European Commission. The project’s main objectives are centred on improving students’ low achievement and stimulating secondary school students’ interest in science subjects. The article focuses on scientific education and its challenges and suggests an innovative approach which connects science with nature. It examines one of the most important project outputs: the e-lessons (short video lessons created within the European partnership and the way they can contribute to increasing students’ motivation to learn science. Participant teachers’ testimonials have also been considered in the general evaluation of this project output.

  19. Learning in Plants: Lessons from Mimosa pudica

    Directory of Open Access Journals (Sweden)

    Charles Ira Abramson

    2016-03-01

    Full Text Available This article provides an overview of the early Mimosa pudica literature; much of which is in journals not easily accessible to the reader. In contrast to the contemporary plant learning literature which is conducted primarily by plant biologists, this early literature was conducted by comparative psychologists whose goal was to search for the generality of learning phenomena such as habituation, and classical conditioning using experimental designs based on animal conditioning studies. In addition to reviewing the early literature, we hope to encourage collaborations between plant biologists and comparative psychologists by familiarizing the reader with issues in the study of learning faced by those working with animals. These issues include no consistent definition of learning phenomena and an overreliance on the use of cognition. We suggested that greater collaborative efforts be made between plant biologists and comparative psychologists if the study of plant learning is to be fully intergraded into the mainstream behavior theory.

  20. Previous experience in manned space flight: A survey of human factors lessons learned

    Science.gov (United States)

    Chandlee, George O.; Woolford, Barbara

    1993-01-01

    Previous experience in manned space flight programs can be used to compile a data base of human factors lessons learned for the purpose of developing aids in the future design of inhabited spacecraft. The objectives are to gather information available from relevant sources, to develop a taxonomy of human factors data, and to produce a data base that can be used in the future for those people involved in the design of manned spacecraft operations. A study is currently underway at the Johnson Space Center with the objective of compiling, classifying, and summarizing relevant human factors data bearing on the lessons learned from previous manned space flights. The research reported defines sources of data, methods for collection, and proposes a classification for human factors data that may be a model for other human factors disciplines.

  1. Lessons learned from solar energy projects in Saudi Arabia

    International Nuclear Information System (INIS)

    Huraib, F.S.; Hasnain, S.M.; Alawaji, S.H.

    1996-01-01

    This paper describes the lessons learned from the major RD and D activities at Energy Research Institute (ERI), King Abdulaziz City for Science and Technology (KACST) in the field of solar energy. Photovoltaic, solar thermal dishes, solar water heating, solar water pumping and desalination, solar hydrogen production and utilization are some of the areas studied for solar energy applications. Recommendations and guidelines for future solar energy research, development, demonstration and dissemination in Saudi Arabia are also given. (Author)

  2. Reactor D and D at Argonne National Laboratory - lessons learned

    International Nuclear Information System (INIS)

    Fellhauer, C. R.

    1998-01-01

    This paper focuses on the lessons learned during the decontamination and decommissioning (D and D) of two reactors at Argonne National Laboratory-East (ANL-E). The Experimental Boiling Water Reactor (EBWR) was a 100 MW(t), 5 MSV(e) proof-of-concept facility. The Janus Reactor was a 200 kW(t) reactor located at the Biological Irradiation Facility and was used to study the effects of neutron radiation on animals

  3. Development of an HIV Prevention Videogame: Lessons Learned

    OpenAIRE

    Kimberly Hieftje; Lynn E. Fiellin; Tyra Pendergrass; Lindsay R Duncan

    2016-01-01

    The use of videogames interventions is becoming an increasingly popular and effective strategy in disease prevention and health promotion; however, few health videogame interventions have been scientifically rigorously evaluated for their efficacy. Moreover, few examples of the formative process used to develop and evaluate evidence-based health videogame interventions exist in the scientific literature. The following paper provides valuable insight into the lessons learned during the process...

  4. Creating the High-Resolution Settlement Layer - lessons learned

    Science.gov (United States)

    Gros, A.

    2017-12-01

    Facebook publishes the High-resolution Settlement Layer (HRSL: https://ciesin.columbia.edu/data/hrsl/) in collaboration with Columbia University's CIESIN institute and the World Bank. So far, data for 13 countries have been published over the past nine months. HRSL data for Burkina Faso, Ghana, Haiti, Ivory Coast, Madagascar, Malawi, Mexico, The Philippines, Rwanda, South Africa, Sri Lanka, Thailand, and Uganda are available for download. We will present a status update and report on lessons learned.

  5. Savannah River Site environmental restoration lessons learned program

    International Nuclear Information System (INIS)

    Plunkett, R.A.; Leibfarth, E.C.; Treger, T.M.; Blackmon, A.M.

    1993-01-01

    For the past three years environmental restoration has been formally consolidated at Savannah River Site. Accomplishments include waste site investigations to closure activities. Positive, as well as negatively impacting, events have occurred. Until recently, lessons learned were captured on a less than formal basis. Now, a program based upon critiques, evaluations and corrective actions is being used. This presentation reviews the development, implementation and use of that program

  6. Social Networking Sites and Addiction: Ten Lessons Learned

    OpenAIRE

    Kuss, Daria J.; Griffiths, Mark D.

    2017-01-01

    Online social networking sites (SNSs) have gained increasing popularity in the last decade, with individuals engaging in SNSs to connect with others who share similar interests. The perceived need to be online may result in compulsive use of SNSs, which in extreme cases may result in symptoms and consequences traditionally associated with substance-related addictions. In order to present new insights into online social networking and addiction, in this paper, 10 lessons learned concerning onl...

  7. Evaluation of a potential nuclear fuel repository criticality: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, J.R.; Evans, D.

    1995-10-01

    This paper presents lessons learned from a Probabilistic Risk Assessment (PRA) of the potential for a criticality in a repository containing spent nuclear fuel with high enriched uranium. The insights gained consisted of remarkably detailed conclusions about design issues, failure mechanisms, frequencies and source terms for events up to 10,000 years in the future. Also discussed are the approaches taken by the analysts in presenting this very technical report to a nontechnical and possibly antagonistic audience.

  8. Lessons learned in the accident of contamination with Pu-239

    International Nuclear Information System (INIS)

    Molina, G.; Ruiz C, M.; Angeles C, A.; Benitez S, J.A.

    2004-01-01

    This work describes the lessons learned during the accident by transuranic contamination in the National Institute of Nuclear Research happened between 1998 and 2003. The origin of the same one is the not authorized transfer of 0.51 g of plutonium metallic used as pattern source in the Department of Metrology to a laboratory which lacked of physical infrastructure, training and team to manipulate this source. (Author)

  9. Evaluation of a potential nuclear fuel repository criticality: Lessons learned

    International Nuclear Information System (INIS)

    Wilson, J.R.; Evans, D.

    1995-01-01

    This paper presents lessons learned from a Probabilistic Risk Assessment (PRA) of the potential for a criticality in a repository containing spent nuclear fuel with high enriched uranium. The insights gained consisted of remarkably detailed conclusions about design issues, failure mechanisms, frequencies and source terms for events up to 10,000 years in the future. Also discussed are the approaches taken by the analysts in presenting this very technical report to a nontechnical and possibly antagonistic audience

  10. Lessons learned in wake of WPPSS

    International Nuclear Information System (INIS)

    Koenen, A.V.; Gillespie, J.W.

    1984-01-01

    Several fundamentals of public power financial management have become more critical in the wake of the Washington Public Power Supply System (WPPSS) default: the human and financial costs of trying to resolve problems of this complexity after they occur will require an almost unimaginable amount of time and money that could be productively employed elsewhere; the economic feasibility of the project is paramount, and is far more important than its legal security or its attractiveness to utility managers; the ratepayers' ability and willingness to pay is the key security in public power financing; management performance, not promises, will be the measure of the post WPPSS marketplace; financial flexibility is crucial. Using these lessons, the author outlines a five-step program of strategic planning for planning and managing long-term projects

  11. Lessons learned -- NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Flowers, L.

    1998-07-01

    In 1993, a workshop was convened at the National Renewable Energy Laboratory (NREL) to discuss the issues of applying renewable energy in a sustainable manner to international rural development. One of the summary recommendations was that NREL could assist in the renewable energy for rural electrification effort by developing and supplying six related activities: resource assessment, comparative analysis and modeling, performance monitoring and analysis, pilot project development, internet-based project data, communications, and training. In response to this recommendation, NREL launched its Village Power Program consisting of these activities that cut across NREL technologies and disciplines. Currently NREL is active in 20 countries, with pilot projects in 12 of those countries. At this time the technologies include photovoltaics, wind, biomass, and hybrids. The rural applications include home lighting and communications, water pumping, schools and health posts, battery charging stations, ecotourism, and village systems. These pilot projects are central to the renewable energy village power development through the demonstration of three aspects critical to replication and implementation of the projects on a significant scale. The three aspects are technical functionality, economic competitiveness, and institutional sustainability. It is important to note that the pilot projects from which NREL's experience has been gained were funded and, in many cases, developed by other organizations and agencies. NREL's role has been one of technical assistance or project management or both. The purpose of this paper is to describe the lessons NREL staff has gleaned from their participation in the various pilot projects. The author hopes that these lessons will help the Renewable Energy-Based Rural Electrification (RERE) community in implementing sustainable projects that lead to replication.

  12. LESSONS LEARNED THROUGH OPTIMIZATION OF THE VOLUNTARY CORRECTIVE ACTION PROCESS

    International Nuclear Information System (INIS)

    Thacker, M. S.; Freshour, P.; McDonald, W.

    2002-01-01

    Valuable experience in environmental remediation was gained at Sandia National Laboratories/New Mexico (Sandia) by concurrently conducting Voluntary Corrective Actions (VCAs) at three Solid Waste Management Units (SWMUs). Sandia combined the planning, implementation, and reporting phases of three VCAs with the goal of realizing significant savings in both cost and schedule. The lessons learned through this process have been successfully implemented within the Sandia Environmental Restoration (ER) Project and could be utilized at other locations with multiple ER sites. All lessons learned resulted from successful teaming with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB), Sandia management, a Sandia risk assessment team, and Sandia waste management personnel. Specific lessons learned included the following: (1) potential efficiencies can be exploited by reprioritization and rescheduling of activities; (2) cost and schedule reductions can be realized by combining similar work at contiguous sites into a single effort; (3) working with regulators to develop preliminary remediation goals (PRGs) and gain regulatory acceptance for VCA planning prior to project initiation results in significant time savings throughout the remediation and permit modification processes; (4) effective and thoughtful contingency planning removes uncertainties and defrays costs so that projects can be completed without interruption; (5) timely collection of waste characterization samples allows efficient disposal of waste streams, and (6) concurrent reporting of VCA activities results in significant savings in time for the authors and reviewers

  13. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  14. Worldwide Overview of Lessons Learned from Decommissioning Projects

    International Nuclear Information System (INIS)

    Laraia, Michele

    2008-01-01

    With an increasing number of radioactive facilities and reactors now reaching the end of their useful life and being taken out of service, there is a growing emphasis worldwide on the safe and efficient decommissioning of such plants. There is a wealth of experience already gained in decommissioning projects for all kinds of nuclear facilities. It is now possible to compare and discuss progress and accomplishments worldwide. In particular, rather than on the factual descriptions of projects, technologies and case histories, it is important to focus on lessons learned: in this way, the return of experience is felt to effectively contribute to progress. Key issues - inevitably based on a subjective ranking - are presented in this paper. Through the exchange of lessons learned, it is possible to achieve full awareness of the need for resources for and constraints of safe and cost-effective decommissioning. What remains now is the identification of specific, remaining issues that may hinder or delay the smooth progress of decommissioning. To this end, lessons learned provide the necessary background information; this paper tries to make extensive use of practical experience gained by the international community

  15. Communicating for Climate Change Adaptation: Lessons from a Case Study with Nature-Based Tour Operators

    Science.gov (United States)

    Timm, K.; Sparrow, E. B.; Pettit, E. C.; Trainor, S. F.; Taylor, K.

    2014-12-01

    Increasing temperatures are projected to have a positive effect on the length of Alaska's tourism season, but the natural attractions that tourism relies on, such as glaciers, wildlife, fish, or other natural resources, may change. In order to continue to derive benefits from these resources, nature-based tour operators may have to adapt to these changes, and communication is an essential, but poorly understood, component of the climate change adaptation process. The goal of this study was to determine how to provide useful climate change information to nature-based tour operators by answering the following questions: 1. What environmental changes do nature-based tour operators perceive? 2. How are nature-based tour operators responding to climate and environmental change? 3. What climate change information do nature-based tour operators need? To answer these questions, twenty-four nature-based tour operators representing 20 different small and medium sized businesses in Juneau, Alaska were interviewed. The results show that many of Juneau's nature-based tour operators are observing, responding to, and in some cases, actively planning for further changes in the environment. The types of responses tended to vary depending on the participants' certainty in climate change and the perceived risks to their organization. Using these two factors, this study proposes a framework to classify climate change responses for the purpose of generating meaningful information and communication processes that promote adaptation and build adaptive capacity. During the course of the study, several other valuable lessons were learned about communicating about adaptation. The results of this study demonstrate that science communication research has an important place in the practice of promoting and fostering climate change adaptation. While the focus of this study was tour operators, the lessons learned may be valuable to other organizations striving to engage unique groups in climate

  16. Reflections on Designing a MPA Service-Learning Component: Lessons Learned

    Science.gov (United States)

    Roman, Alexandru V.

    2015-01-01

    This article provides the "lessons learned" from the experience of redesigning two sections (face-to-face and online) of a core master of public administration class as a service-learning course. The suggestions made here can be traced to the entire process of the project, from the "seed idea" through its conceptualization and…

  17. Experiential Learning: Lessons Learned from the UND Business and Government Symposium

    Science.gov (United States)

    Harsell, Dana Michael; O'Neill, Patrick B.

    2010-01-01

    The authors describe lessons learned from a limited-duration experiential learning component of a Master's level course. The course is open to Master's in Business and Master's in Public Administration students and explores the relationships between government and business. A complete discussion of the Master's in Business and Master's in Public…

  18. Spent Nuclear Fuel Transportation: An Examination of Potential Lessons Learned From Prior Shipping Campaigns

    International Nuclear Information System (INIS)

    M. Keister; K, McBride

    2006-01-01

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, assigned the Department of Energy (DOE) responsibility for developing and managing a Federal system for the disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The Office of Civilian Radioactive Waste Management (OCRWM) is responsible for accepting, transporting, and disposing of SNF and HLW at the Yucca Mountain repository (if licensed) in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. OCRWM faces a near-term challenge--to develop and demonstrate a transportation system that will sustain safe and efficient shipments of SNF and HLW to a repository. To better inform and improve its current planning, OCRWM has extensively reviewed plans and other documents related to past high-visibility shipping campaigns of SNF and other radioactive materials within the United States. This report summarizes the results of this review and, where appropriate, lessons learned. The objective of this lessons learned study was to identify successful, best-in-class trends and commonalities from past shipping campaigns, which OCRWM could consider when planning for the development and operation of a repository transportation system. Note: this paper is for analytical and discussion purposes only, and is not an endorsement of, or commitment by, OCRWM to follow any of the comments or trends. If OCRWM elects to make such commitments at a future time, they will be appropriately documented in formal programmatic policy statements, plans and procedures. Reviewers examined an extensive study completed in 2003 by DOE's National Transportation Program (NTP), Office of Environmental Management (EM), as well as plans and documents related to SNF shipments since issuance of the NTP report. OCRWM examined specific planning, business, institutional and operating practices that have been identified by DOE, its transportation contractors

  19. Transforming Past Lessons to Mold the Future: A Case Study on Operation NICKEL GRASS

    National Research Council Canada - National Science Library

    Riney, Thomas J

    2003-01-01

    ...?" In this case, the specific lessons from the 1973 airlift operation supporting Israel, Operation NICKEL GRASS, were analyzed and generalized using the Tenets of Operations described in U.S. Army field manuals...

  20. A summary of lessons learned activities conducted at the OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    Hallbert, B.P.

    1997-01-01

    A series of lessons learned studies have been conducted at the OECD Halden Reactor Project. The purpose of these lessons learned reports are to summarize knowledge and experience gained across a number of research project. This paper presents a summary of main issues addressed in four of these lessons learned projects. These are concerned with software development and quality assurance, software reliability, methods for test and evaluation of developed systems, and the evaluation of system design features

  1. Lessons learned from application of the Swedish regulations for decommissioning of nuclear facilities - The regulator's perspective

    International Nuclear Information System (INIS)

    Efraimsson, Henrik; Amft, Martin; Leisvik, Mathias

    2016-01-01

    The paper presents an overview of the Swedish regulations for decommissioning of nuclear facilities. It describes some of the experiences that the Swedish Radiation Safety Authority has gained from the application of these regulations. The focus of the present paper lies on administrative aspects of the care and maintenance operation and on the safety related documentation that has to be prepared before dismantling commences. Lessons learned during recent years will be considered when revising the regulations for decommissioning. Also these lessons learned will help to streamline the administration of the large NPP decommissioning projects that are anticipated to commence in Sweden in the near future. (authors)

  2. Lessons learned in communicating nuclear transportation issues - a case study

    International Nuclear Information System (INIS)

    Reilly, B.; Austin, P.

    1992-01-01

    Successful communication requires several key elements. They include a non-intimidating forum for exchanging information, two-way communication, advance preparation to identify what each party wants to learn, and feedback. There is no single approach that guarantees success. Factors such as technical complexity of the issue, level of support by the public, and trust and confidence among the parties all play a role in determining the most workable approach for any particular situation. This paper illustrates lessons learned by the US Department of Energy (DOE) in communicating nuclear waste disposal and transportation issues to the public

  3. Collaboration between a Child Telephone Helpline and Sexual and Reproductive Health and Rights Organisations in Senegal: Lessons Learned

    Science.gov (United States)

    Flink, Ilse Johanna Elisabeth; Mbaye, Solange Marie Odile; Diouf, Simon Richard Baye; Baumgartner, Sophie; Okur, Pinar

    2018-01-01

    This study identifies lessons learned from a collaboration between a child telephone helpline and sexual and reproductive health and rights (SRHR) organisations in Senegal established in the context of an SRHR programme for young people. We assessed how helpline operators are equipped to address sexual health and rights issues with young people,…

  4. Lessons learned from Gen II NPP staffing approaches applicable to new reactors - 15003

    International Nuclear Information System (INIS)

    Goodnight, C.

    2015-01-01

    This paper discusses lessons learned from the operation of the Gen II fleet of existing nuclear power plants (NPPs), in terms of staffing, that can be applied to the final design, deployment, and operation of new reactor designs. The most significant of these lessons is the need to appropriately staff the facility, having the right number of people with the required skills and experience. This begs the question of how to identify those personnel requirements. For NPPs, there are five key factors that ultimately will determine the effectiveness and costs of operating nuclear power plants (NPPs): 1) The Nuclear Steam Supply System (NSSS) and the layout of the plant site; 2) The processes which the operating organization applies; 3) The organizational structure of the operating organization; 4) The organizational culture of the operating organization, and 5) The regulatory framework under which the licensee must operate. In summary, this paper identifies opportunities to minimize staffing and costs learned from Gen II NPPs that may be applicable for new nuclear plants. (author)

  5. Lessons Learned from the Node 1 Atmosphere Control and Storage and Water Recovery and Management Subsystem Design

    Science.gov (United States)

    Williams, David E.

    2011-01-01

    Node 1 flew to the International Space Station (ISS) on Flight 2A during December 1998. To date the National Aeronautics and Space Administration (NASA) has learned a lot of lessons from this module based on its history of approximately two years of acceptance testing on the ground and currently its twelve years on-orbit. This paper will provide an overview of the ISS Environmental Control and Life Support (ECLS) design of the Node 1 Atmosphere Control and Storage (ACS) and Water Recovery and Management (WRM) subsystems and it will document some of the lessons that have been learned to date for these subsystems based on problems prelaunch, problems encountered on-orbit, and operational problems/concerns. It is hoped that documenting these lessons learned from ISS will help in preventing them in future Programs.

  6. Lessons learned from case studies of inhalation exposures of workers to radioactive aerosols

    Energy Technology Data Exchange (ETDEWEB)

    Hoover, M.D.; Fencl, A.F.; Newton, G.J. [and others

    1995-12-01

    Various Department of Energy requirements, rules, and orders mandate that lessons learned be identified, evaluated, shared, and incorporated into current practices. The recently issued, nonmandatory DOE standard for Development of DOE Lessons Learned Program states that a DOE-wide lessons learned program will {open_quotes}help to prevent recurrences of negative experiences, highlight best practices, and spotlight innovative ways to solve problems or perform work more safely, efficiently, and cost effectively.{close_quotes} Additional information about the lessons learned program is contained in the recently issued DOE handbook on Implementing U.S. Department of Energy Lessons Learned Programs and in October 1995 DOE SAfety Notice on Lessons Learned Programs. This report summarizes work in progress at ITRI to identify lessons learned for worker exposures to radioactive aerosols, and describes how this work will be incorporated into the DOE lessons learned program, including a new technical guide for measuring, modeling, and mitigating airborne radioactive particles. Follow-on work is focusing on preparation of {open_quotes}lessons learned{close_quotes} training materials for facility designers, managers, health protection professionals, line supervisors, and workers.

  7. Impact of the Implementation of Information Technology on the Center for Army Lessons Learned

    National Research Council Canada - National Science Library

    Wizner, Anthony

    2001-01-01

    .... This research evaluates the impact that the implementation of an Information Technology infrastructure has had on the efficiency of Army's Lessons Learned Process and the overall effectiveness...

  8. The learning teacher in a collaborative lesson study team within the context of mathematics

    NARCIS (Netherlands)

    Goei, Sui Lin; Verhoef, Neeltje Cornelia

    2015-01-01

    This paper summarises results of two studies on teachers’ learning when participating in a collaborative Lesson Study team within the context of mathematics teaching. In study one, Lesson Study was used in the classic way of preparing, designing, executing and reflecting on the research lesson.

  9. Involvement in Learning Revisited: Lessons We Have Learned.

    Science.gov (United States)

    Astin, Alexander W.

    1996-01-01

    Discusses interconnections between the following two national reports: (1) Involvement in Learning; and (2) The Student Learning Imperative. Reviews recent research on student development in order to demonstrate how student affairs professionals can use this information to enhance learning. (SNR)

  10. Chinese haze versus Western smog: lessons learned.

    Science.gov (United States)

    Zhang, Junfeng Jim; Samet, Jonathan M

    2015-01-01

    Air pollution in many Chinese cities has been so severe in recent years that a special terminology, the "Chinese haze", was created to describe China's air quality problem. Historically, the problem of Chinese haze has developed several decades after Western high-income countries have significantly improved their air quality from the smog-laden days in the early- and mid-20(th) century. Hence it is important to provide a global and historical perspective to help China combat the current air pollution problems. In this regard, this article addresses the followings specific questions: (I) What is the Chinese haze in comparison with the sulfurous (London-type) smog and the photochemical (Los Angeles-type) smog? (II) How does Chinese haze fit into the current trend of global air pollution transition? (III) What are the major mitigation measures that have improved air quality in Western countries? and (IV) What specific recommendations for China can be derived from lessons and experiences from Western countries?

  11. Transradial access: lessons learned from cardiology.

    Science.gov (United States)

    Snelling, Brian M; Sur, Samir; Shah, Sumedh Subodh; Marlow, Megan M; Cohen, Mauricio G; Peterson, Eric C

    2018-05-01

    Innovations in interventional cardiology historically predate those in neuro-intervention. As such, studying trends in interventional cardiology can be useful in exploring avenues to optimise neuro-interventional techniques. One such cardiology innovation has been the steady conversion of arterial puncture sites from transfemoral access (TFA) to transradial access (TRA), a paradigm shift supported by safety benefits for patients. While neuro-intervention has unique anatomical challenges, the access itself is identical. As such, examining the extensive cardiology literature on the radial approach has the potential to offer valuable lessons for the neuro-interventionalist audience who may be unfamiliar with this body of work. Therefore, we present here a report, particularly for neuro-interventionalists, regarding the best practices for TRA by reviewing the relevant cardiology literature. We focused our review on the data most relevant to our audience, namely that surrounding the access itself. By reviewing the cardiology literature on metrics such as safety profiles, cost and patient satisfaction differences between TFA and TRA, as well as examining the technical nuances of the procedure and post-procedural care, we hope to give physicians treating complex cerebrovascular disease a broader data-driven understanding of TRA. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  12. Lessons Learned from One-to-One

    Science.gov (United States)

    McLester, Susan

    2011-01-01

    When in 2002 Maine launched its pioneering Maine Learning Technology Initiative (MLTI) that equipped every one of the state's 30,000 seventh- and eighth-grade public school students and teachers with their own Apple iBook, all eyes were on the endeavor. As the first statewide one-to-one deployment, MLTI's $37 million education experiment…

  13. Lessons learned from the Apple stores.

    Science.gov (United States)

    Pinkney, Henry; Baum, Neil

    2012-01-01

    Medical practices have an opportunity to improve the services that they offer their patients. Practices can look at other businesses and industries for examples of outstanding customer service. This article will discuss the services provided by Apple, Inc., and how medical practices can learn from this industry giant and improve the services that they offer patients.

  14. Lessons Learned from WashingtonOnline

    Science.gov (United States)

    Broughton, Connie

    2009-01-01

    People do not want to know the history, minutiae of policy, or operations, or even the political intrigues of a virtual consortium. People want to know if the consortium has value, whether it can help them, and if it is a threat. In this article, the author focuses on the operating principles and policies that have proven successful in the…

  15. Lessons learned about ageing and gerontological nursing in South Africa

    Directory of Open Access Journals (Sweden)

    Staja Q. Booker

    2015-07-01

    Full Text Available Background: The unprecedented global growth in older adults merits high-quality gerontological nursing care. As gerontological nursing grows in visibility in developed and developing countries, nurses must possess a broader worldview of ageing with knowledge of physiological, psychosocial, and cultural issues. Purpose: The purpose of this article is to: (1 highlight lessons learned on differences and similarities in ageing and care of older adults in the United States of America (USA and South Africa (SA; and (2 provide recommendations on how to advance gerontological nursingeducation in SA. Methods: A two-week international service-learning project was undertaken by visiting SA and learning about their nursing system and care of older adults. Service-learning is an innovative teaching-learning-service method that provided reflective and hands-on experience of gerontological nursing. This article provides a personal reflection of lessons learned about ageing and gerontological nursing during the service-learning project. Findings: Care of older adults in SA is in many ways different from and similar to that in the USA. Consequently global nurses should recognise those differences and provide culturally appropriate care. This service-learning experience also demonstrated the need for gerontological nursing education in SA. Based on this, recommendations on how to infuse and advance gerontological nursing education in SA are provided. Conclusion: Caring for older adults in a global context requires knowledge and understanding of cultures and their values and practices. With a growing population of diverse older adults, there is a need for incorporation

  16. Lessons learned from case studies of inhalation exposures of workers to radioactive aerosols

    International Nuclear Information System (INIS)

    Hoover, M.D.; Fencl, A.F.; Newton, G.J.

    1995-01-01

    Various Department of Energy requirements, rules, and orders mandate that lessons learned be identified, evaluated, shared, and incorporated into current practices. The recently issued, nonmandatory DOE standard for Development of DOE Lessons Learned Program states that a DOE-wide lessons learned program will open-quotes help to prevent recurrences of negative experiences, highlight best practices, and spotlight innovative ways to solve problems or perform work more safely, efficiently, and cost effectively.close quotes Additional information about the lessons learned program is contained in the recently issued DOE handbook on Implementing U.S. Department of Energy Lessons Learned Programs and in October 1995 DOE SAfety Notice on Lessons Learned Programs. This report summarizes work in progress at ITRI to identify lessons learned for worker exposures to radioactive aerosols, and describes how this work will be incorporated into the DOE lessons learned program, including a new technical guide for measuring, modeling, and mitigating airborne radioactive particles. Follow-on work is focusing on preparation of open-quotes lessons learnedclose quotes training materials for facility designers, managers, health protection professionals, line supervisors, and workers

  17. TANK WASTE RETRIEVAL LESSONS LEARNED AT THE HANFORD SITE

    International Nuclear Information System (INIS)

    DODD, R.A.

    2006-01-01

    One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the US Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60% of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons of this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring the waste to the DST system since 1997 as part of the interim stabilization program. Retrieval of SST saltcake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. This paper presents lessons learned from retrieval of tank waste at the Hanford Site and discusses how this information is used to optimize retrieval system efficiency, improve overall cost effectiveness of retrieval operations, and ensure that HFFACO requirements are met

  18. The California experience : lessons learned and prospects for the future

    Energy Technology Data Exchange (ETDEWEB)

    Levin, J. [AC Transit, Oakland, CA (United States)

    2007-07-01

    AC Transit operates 650 hydrogen-powered mass transit buses that serve 1.5 million people in 13 cities in California. This presentation discussed the impact of the buses on public health, quality of life and cost savings. Hydrogen has been touted as a diversified and renewable energy supply that can provide energy independence and reduction in global warming. Mass transit systems have proven to be well suited for testing the limits of hydrogen-powered vehicles primarily because of the centralized fueling and maintenance structure. AC Transit began ZEbus testing in November 1999 and became involved in the California Fuel Cell Partnership in 2000. The NeBus test was performed in 2000, followed by the ISE/UTC Thor Bus in 2003/2004. The governor's inauguration of the zero emission buses was in January 2007. The lessons learned from the California experience were: (1) motivation must be for the right reason, (2) a champion is required, (3) community and political support is required, (4) capital investment is required, (5) a strong management team is required, (6) partners must be chosen wisely, (7) the end user or customer must be allowed to drive the design, (8) inform the public about plans, (9) evaluation is essential to industry-wide application, (10) all resources must be considered for outreach and education, (11) optimism is required to surpass challenges, (12) the technology should be promoted for future generations. The presentation concluded with comments on market value of hydrogen and fuel cell vehicles, their fuel efficiency, reliability and durability. tabs., figs.

  19. Energy market reform - lessons learned and next steps

    International Nuclear Information System (INIS)

    Doucet, G.

    2004-01-01

    This presentation will be based on the World Energy Council's recently published report, Energy Market Reform: Lessons Learned and Next Steps with Special Emphasis on the Energy Access Problems of Developing Countries. The report draws on practical lessons from past studies carried out by the World Energy Council and on current experiences on the desirable architecture of market reforms in electricity and natural gas. The approach of the study was not to further deepen the analysis or to provide technical recommendations but rather, to build a debate guided by the common thread of energy security and end-user e mpowerment , highlighting the possible areas of conflict of interest and the broad solutions that might be chosen depending on the local circumstances for different parts of the energy chains. The ambition was to identify key concerns and to initiate a debate on possible answers.(author)

  20. Transition and Closeout of the Former DOE Mound Plant Site: Lessons Learned

    International Nuclear Information System (INIS)

    Carpenter, C. P.; Marks, M. L.; Smiley, S.L.; Gallaher, D. M.

    2006-01-01

    environmental cleanup to post-closure operations is complex and requires creative and innovative solutions. Future environmental cleanups can benefit from the lessons learned gained by DOE and contractor organizations. (authors)

  1. Mine Warfare: Lessons Learned and Forgotten

    National Research Council Canada - National Science Library

    Evangelista, Rickson E

    2008-01-01

    .... This analysis focuses on four battles/operations that involved mine countermeasures: The Battle of Mobile Bay, the amphibious landings at Inchon and Wonsan, and the planned amphibious landing into Kuwait. If the U.S...

  2. PWR fuel behavior: lessons learned from LOFT

    International Nuclear Information System (INIS)

    Russell, M.L.

    1981-01-01

    A summary of the experience with the Loss-of-Fluid Test (LOFT) fuel during loss-of-coolant experiments (LOCEs), operational and overpower transient tests and steady-state operation is presented. LOFT provides unique capabilities for obtaining pressurized water reactor (PWR) fuel behavior information because it features the representative thermal-hydraulic conditions which control fuel behavior during transient conditions and an elaborate measurement system to record the history of the fuel behavior

  3. Improving the primary school science learning unit about force and motion through lesson study

    Science.gov (United States)

    Phaikhumnam, Wuttichai; Yuenyong, Chokchai

    2018-01-01

    The study aimed to develop primary school science lesson plan based on inquiry cycle (5Es) through lesson study. The study focused on the development of 4 primary school science lesson plans of force and motion for Grade 3 students in KKU Demonstration Primary School (Suksasart), first semester of 2015 academic year. The methodology is mixed method. The Inthaprasitha (2010) lesson study cycle was implemented in group of KKU Demonstration Primary School. Instruments of reflection of lesson plan developing included participant observation, meeting and reflection report, lesson plan and other document. The instruments of examining students' learning include classroom observation and achievement test. Data was categorized from these instruments to find the issues of changing and improving the good lesson plan of Thai primary school science learning. The findings revealed that teachers could develop the lesson plans through lesson study. The issues of changing and improving were disused by considering on engaging students related to societal issues, students' prior knowledge, scientific concepts for primary school students, and what they learned from their changing. It indicated that the Lesson Study allowed primary school science teachers to share ideas and develop ideas to improve the lesson. The study may have implications for Thai science teacher education through Lesson Study.

  4. The 2015 Nepal earthquake disaster: lessons learned one year on.

    Science.gov (United States)

    Hall, M L; Lee, A C K; Cartwright, C; Marahatta, S; Karki, J; Simkhada, P

    2017-04-01

    The 2015 earthquake in Nepal killed over 8000 people, injured more than 21,000 and displaced a further 2 million. One year later, a national workshop was organized with various Nepali stakeholders involved in the response to the earthquake. The workshop provided participants an opportunity to reflect on their experiences and sought to learn lessons from the disaster. One hundred and thirty-five participants took part and most had been directly involved in the earthquake response. They included representatives from the Ministry of Health, local and national government, the armed forces, non-governmental organizations, health practitioners, academics, and community representatives. Participants were divided into seven focus groups based around the following topics: water, sanitation and hygiene, hospital services, health and nutrition, education, shelter, policy and community. Facilitated group discussions were conducted in Nepalese and the key emerging themes are presented. Participants described a range of issues encountered, some specific to their area of expertize but also more general issues. These included logistics and supply chain challenges, leadership and coordination difficulties, impacts of the media as well as cultural beliefs on population behaviour post-disaster. Lessons identified included the need for community involvement at all stages of disaster response and preparedness, as well as the development of local leadership capabilities and community resilience. A 'disconnect' between disaster management policy and responses was observed, which may result in ineffective, poorly planned disaster response. Finding time and opportunity to reflect on and identify lessons from disaster response can be difficult but are fundamental to improving future disaster preparedness. The Nepal Earthquake National Workshop offered participants the space to do this. It garnered an overwhelming sense of wanting to do things better, of the need for a Nepal-centric approach

  5. The roles of lesson study in the development of mathematics learning instrument based on learning trajectory

    Science.gov (United States)

    Misnasanti; Dien, C. A.; Azizah, F.

    2018-03-01

    This study is aimed to describe Lesson Study (LS) activity and its roles in the development of mathematics learning instruments based on Learning Trajectory (LT). This study is a narrative study of teacher’s experiences in joining LS activity. Data collecting in this study will use three methods such as observation, documentations, and deep interview. The collected data will be analyzed with Milles and Huberman’s model that consists of reduction, display, and verification. The study result shows that through LS activity, teachers know more about how students think. Teachers also can revise their mathematics learning instrument in the form of lesson plan. It means that LS activity is important to make a better learning instruments and focus on how student learn not on how teacher teach.

  6. Solid-State Lighting: Early Lessons Learned on the Way to Market

    Energy Technology Data Exchange (ETDEWEB)

    Sandahl, Linda J.; Cort, Katherine A.; Gordon, Kelly L.

    2013-12-31

    The purpose of this report is to document early challenges and lessons learned in the solid-state lighting (SSL) market development as part of the DOE’s SSL Program efforts to continually evaluate market progress in this area. This report summarizes early actions taken by DOE and others to avoid potential problems anticipated based on lessons learned from the market introduction of compact fluorescent lamps and identifies issues, challenges, and new lessons that have been learned in the early stages of the SSL market introduction. This study identifies and characterizes12 key lessons that have been distilled from DOE SSL program results.

  7. Laser Incident Lessons Learned and Action List

    Energy Technology Data Exchange (ETDEWEB)

    Yarotski, Dmitry Anatolievitch [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-02-29

    On Thursday November 19, 2015, LANL postdoc received an eye injury from a reflected, nonvisible laser beam (Class 4, pulsed, wavelength 800 nanometer). The setup is configured to split the laser output into two work areas in which qualified operators conduct research experiments. During this incident, the laser output beam was being projected to both experimental work areas, although only one experimental area was actively being used. The second laser beam directed to the second work area was blocked by an inappropriate device (Plexiglas, reflective, non-normal incidence) that reflected substantial portion of the beam toward the first setup. In preparation for the measurements, worker stepped on the stepstool and decided to remove the laser goggles to better see the micrometer readings which were difficult to see due to insufficient lighting. Immediately, he noticed a flash of light in his eye. The operator quickly replaced the laser eye-wear and then, using an infrared viewer, located a stray laser beam being reflected from the plexiglas beam block. The operator did not think he had sustained any injury and continued working. Later that day, however, he noticed a blurry spot in the vision of his left eye. He notified his supervisor on Friday morning, November 20, 2015, and was taken by CINT management to Sandia National Laboratories (SNL) medical facility for evaluation. SNL Medical did not find any abnormalities, but referred the operator to a local ophthalmologist for further evaluation. Further evaluations by the ophthalmologist on November 21 and November 23 identified a small spot of inflammation near the fovea on the retina in his left eye. The ophthalmologist stated that this spot would most likely heal on its own and that the blurry spot on the operator's vision would go away. A follow-up visit was scheduled. The employee was released back to work without restrictions.

  8. Regulatory analysis and lessons learned from the LLRW [low-level radioactive waste] disposal area at West Valley, New York: Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The New York State Energy Research and Development Authority has sponsored a project to develop an integrated set of site management plans for the West Valley low-level radioactive waste (LLRW) disposal area. The plans were directed to upgrade the disposal area so that passive custodial care and monitoring activities would be sufficient to protect public health and safety and the environment. Tasks 5 and 6, Regulatory Analysis and Lessons Learned, are the subject of this report. The regulatory analysis identified areas of inconsistencies between the historic site operations and the current state and federal LLRW disposal regulations and guidelines. The lessons learned task identified the causes of the disposal problems at West Valley, discussed the lessons learned, and described the responses developed by the NRC and industry to the lessons learned. 85 refs., 6 figs., 19 tabs

  9. Lessons learned from man-made catastrophes

    International Nuclear Information System (INIS)

    Zebroski, E.L.

    1991-01-01

    Risk management is reminiscent of the parable of the blind men learning about the elephant by feeling about it from different directions. They had a wide range of perceptions. Several of the men felt tree trunks, others a huge snake, the sail of a boat, huge walls, or a rope. Imagine the symposium of these blind folks getting together and arguing about which are the most characteristic or essential parts of the elephant. Risk management is this kind of an elephant. It has many angles. GPU Nuclear, the sponsor of this symposium, seems to be one of the mall handful of organizations that is strongly directed and motivated to seek a whole vision of this very complex elephant. This paper reinforces some of Long's six steps of risk management. The intriguing problem is how to keep good advice from sounding like a series of cliches

  10. Solid-State Lighting. Early Lessons Learned on the Way to Market

    Energy Technology Data Exchange (ETDEWEB)

    Sandahl, L. J.; Cort, K. A.; Gordon, K. L.

    2014-01-01

    Analysis of issues and lessons learned during the early stages of solid-state lighting market introduction in the U.S., which also summarizes early actions taken to avoid potential problems anticipated based on lessons learned from the market introduction of compact fluorescent lamps.

  11. Lessons learned on utilizing the SEI/CMM in the federal government work for others environment

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, A.

    1997-11-01

    This report contains viewgraphs on lessons learned on utilizing the Software Engineering Institute Capability Maturity Model in the federal government work for others environment. These viewgraphs outline: data systems research and development; what is the SEI/CMM; Data Systems Research and Development process improvement approach; accomplishments; and lessons learned.

  12. Lessons learned? Selected public acceptance case studies since Three Mile Island

    Energy Technology Data Exchange (ETDEWEB)

    Blee, D. [NAC International, Atlanta Corporate Headquarters, Atlanta, GA (United States)

    2001-02-01

    This paper will present an overview of the present situation, some recent polling survey information, and then look at lessons learned in terms of selected case studies and some global issues over the 22 years since the Three Mile Island (TMI) accident. That is quite an ambitious topic but there are some important lessons we can learn from the post-TMI era. (author)

  13. Lessons offered, lessons learned: reflections on how doing family therapy can affect therapists.

    Science.gov (United States)

    Heatherington, Laurie; Friedlander, Myrna L; Diamond, Gary M

    2014-08-01

    Only in working conjointly with couples and families do therapists literally witness clients struggling to improve their most intimate relationships. In writing this article, we realized that, in true systemic fashion, not only have many of our clients benefited from working with us, but also we have learned some invaluable lessons from them. Indeed, practicing couple and family therapy gives therapists many opportunities to learn about themselves, especially when it is done thoughtfully. In this article, we reflect on myriad ways in which couples and family therapy has affected each of us personally-as individuals, as partners, as parents, as adult children in our families of origin, and as educators. © 2014 Wiley Periodicals, Inc.

  14. Ballistic trauma: lessons learned from iraq and afghanistan.

    Science.gov (United States)

    Shin, Emily H; Sabino, Jennifer M; Nanos, George P; Valerio, Ian L

    2015-02-01

    Management of upper extremity injuries secondary to ballistic and blast trauma can lead to challenging problems for the reconstructive surgeon. Given the recent conflicts in Iraq and Afghanistan, advancements in combat-casualty care, combined with a high-volume experience in the treatment of ballistic injuries, has led to continued advancements in the treatment of the severely injured upper extremity. There are several lessons learned that are translatable to civilian trauma centers and future conflicts. In this article, the authors provide an overview of the physics of ballistic injuries and principles in the management of such injuries through experience gained from military involvement in Iraq and Afghanistan.

  15. Closure of a mixed waste landfill: Lessons learned

    International Nuclear Information System (INIS)

    Phifer, M.A.

    1990-01-01

    Much experience has been gained during the closure of the Mixed Waste Management Facility (MWMF) at the Savannah River Site (SRS) and many lessons were learned. This knowledge was applied to other closures at SRS yielding decreased costs, schedule enhancement, and increased overall project efficiency. The next major area of experience to be gained at SRS in the field of waste site closures will be in the upkeep, maintenance, and monitoring of clay caps. Further test programs will be required to address these requirements

  16. Regional Stability & Lessons Learned in Regional Peace Building

    DEFF Research Database (Denmark)

    Vestenskov, David; Johnsen, Anton Asklund

    , as none of the countries is able to deal with the intrastate and interstate conflicts on its own. The conference Regional Stability & Lessons Learned in Regional Peace Building was the result of comprehensive cooperation between Pakistan’s National Defence University and the Royal Danish Defence College......The NATO-led intervention in Afghanistan is coming to an end, and the necessity of regional peace building solutions for the region’s security issues seems more exigent than ever before. Regional states have to come to terms with each other in some ways if violent extremists are to be countered...

  17. Lessons learned by southern states in transportation of radioactive materials

    International Nuclear Information System (INIS)

    1992-03-01

    This report has been prepared under a cooperative agreement with DOE's Office of Civilian Radioactive Waste Management (OCRWM) and is a summary of the lessons learned by southern states regarding the transportation of radioactive materials including High-Level Radioactive Wastes (HLRW) and Spent Nuclear Fuel (SNF). Sources used in this publication include interviews of state radiological health and public safety officials that are members of the Southern States Energy Board (SSEB) Advisory Committee on Radioactive Materials Transportation, as well as the Board's Transuranic (TRU) Waste Transportation Working Group. Other sources include letters written by the above mentioned committees concerning various aspects of DOE shipment campaigns

  18. Designing a database for performance assessment: Lessons learned from WIPP

    International Nuclear Information System (INIS)

    Martell, M.A.; Schenker, A.

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) Compliance Certification Application (CCA) Performance Assessment (PA) used a relational database that was originally designed only to supply the input parameters required for implementation of the PA codes. Reviewers used the database as a point of entry to audit quality assurance measures for control, traceability, and retrievability of input information used for analysis, and output/work products. During these audits it became apparent that modifications to the architecture and scope of the database would benefit the EPA regulator and other stakeholders when reviewing the recertification application. This paper contains a discussion of the WPP PA CCA database and lessons learned for designing a database

  19. Development of an HIV Prevention Videogame: Lessons Learned

    Directory of Open Access Journals (Sweden)

    Kimberly Hieftje

    2016-06-01

    Full Text Available The use of videogames interventions is becoming an increasingly popular and effective strategy in disease prevention and health promotion; however, few health videogame interventions have been scientifically rigorously evaluated for their efficacy. Moreover, few examples of the formative process used to develop and evaluate evidence-based health videogame interventions exist in the scientific literature. The following paper provides valuable insight into the lessons learned during the process of developing the risk reduction and HIV prevention videogame intervention for young adolescents, PlayForward: Elm City Stories. 

  20. Tuberculin immunotherapy: its history and lessons to be learned.

    Science.gov (United States)

    Vilaplana, Cristina; Cardona, Pere-Joan

    2010-02-01

    The use of tuberculin for the therapy of tuberculosis was attempted more than 100 years ago and abandoned because of its adverse reactions. In this historical review we point out that some of the intensive efforts to avoid the reactions were based on the best scientific rationale available at that time. Balancing the dosage and intervals of tuberculin delivery with clinical and laboratory monitoring of patients achieved a limited success, with implications, toward current research in the field. The role of economical and social aspects at that time is also a lesson to be learned toward current approaches to tuberculosis control. Copyright 2009 Elsevier Masson SAS. All rights reserved.

  1. Evidence for Ancient Life in Mars Meteorites: Lessons Learned

    Science.gov (United States)

    McKay, D. S.

    1998-01-01

    The lines of evidence we first proposed as supporting a hypothesis of early life on Mars are discussed by Treiman, who presents pros and cons of our hypothesis in the light of subsequent research by many groups. Our assessment of the current status of the many controversies over our hypothesis is given in reports by Gibson et al. Rather than repeat or elaborate on that information, I prefer to take an overview and present what I think are some of the "lessons learned" by our team in particular, and by the science community in general.

  2. PUREX/UO3 facilities deactivation lessons learned history

    International Nuclear Information System (INIS)

    Gerber, M.S.

    1997-01-01

    In May 1997, a historic deactivation project at the PUREX (Plutonium URanium EXtraction) facility at the Hanford Site in south-central Washington State concluded its activities (Figure ES-1). The project work was finished at $78 million under its original budget of $222.5 million, and 16 months ahead of schedule. Closely watched throughout the US Department of Energy (DOE) complex and by the US Department of Defense for the value of its lessons learned, the PUREX Deactivation Project has become the national model for the safe transition of contaminated facilities to shut down status

  3. JLab SRF Cavity Fabrication Errors, Consequences and Lessons Learned

    International Nuclear Information System (INIS)

    Marhauser, Frank

    2011-01-01

    Today, elliptical superconducting RF (SRF) cavities are preferably made from deep-drawn niobium sheets as pursued at Jefferson Laboratory (JLab). The fabrication of a cavity incorporates various cavity cell machining, trimming and electron beam welding (EBW) steps as well as surface chemistry that add to forming errors creating geometrical deviations of the cavity shape from its design. An analysis of in-house built cavities over the last years revealed significant errors in cavity production. Past fabrication flaws are described and lessons learned applied successfully to the most recent in-house series production of multi-cell cavities.

  4. Job task analysis: lessons learned from application in course development

    International Nuclear Information System (INIS)

    Meredith, J.B.

    1985-01-01

    Those at Public Service Electric and Gas Company are committed to a systematic approach to training known as Instructional System Design. Our performance-based training emphasizes the ISD process to have trainees do or perform the task whenever and wherever it is possible for the jobs for which they are being trained. Included is a brief description of our process for conducting and validating job analyses. The major thrust of this paper is primarily on the lessons that we have learned in the design and development of training programs based upon job analysis results

  5. PUREX/UO{sub 3} facilities deactivation lessons learned: History

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1997-11-25

    In May 1997, a historic deactivation project at the PUREX (Plutonium URanium EXtraction) facility at the Hanford Site in south-central Washington State concluded its activities (Figure ES-1). The project work was finished at $78 million under its original budget of $222.5 million, and 16 months ahead of schedule. Closely watched throughout the US Department of Energy (DOE) complex and by the US Department of Defense for the value of its lessons learned, the PUREX Deactivation Project has become the national model for the safe transition of contaminated facilities to shut down status.

  6. Lessons Learned From Community-Based Approaches to Sodium Reduction

    Science.gov (United States)

    Kane, Heather; Strazza, Karen; Losby PhD, Jan L.; Lane, Rashon; Mugavero, Kristy; Anater, Andrea S.; Frost, Corey; Margolis, Marjorie; Hersey, James

    2017-01-01

    Purpose This article describes lessons from a Centers for Disease Control and Prevention initiative encompassing sodium reduction interventions in six communities. Design A multiple case study design was used. Setting This evaluation examined data from programs implemented in six communities located in New York (Broome County, Schenectady County, and New York City); California (Los Angeles County and Shasta County); and Kansas (Shawnee County). Subjects Participants (n = 80) included program staff, program directors, state-level staff, and partners. Measures Measures for this evaluation included challenges, facilitators, and lessons learned from implementing sodium reduction strategies. Analysis The project team conducted a document review of program materials and semi structured interviews 12 to 14 months after implementation. The team coded and analyzed data deductively and inductively. Results Five lessons for implementing community-based sodium reduction approaches emerged: (1) build relationships with partners to understand their concerns, (2) involve individuals knowledgeable about specific venues early, (3) incorporate sodium reduction efforts and messaging into broader nutrition efforts, (4) design the program to reduce sodium gradually to take into account consumer preferences and taste transitions, and (5) identify ways to address the cost of lower-sodium products. Conclusion The experiences of the six communities may assist practitioners in planning community-based sodium reduction interventions. Addressing sodium reduction using a community-based approach can foster meaningful change in dietary sodium consumption. PMID:24575726

  7. Lessons learned from community-based approaches to sodium reduction.

    Science.gov (United States)

    Kane, Heather; Strazza, Karen; Losby, Jan L; Lane, Rashon; Mugavero, Kristy; Anater, Andrea S; Frost, Corey; Margolis, Marjorie; Hersey, James

    2015-01-01

    This article describes lessons from a Centers for Disease Control and Prevention initiative encompassing sodium reduction interventions in six communities. A multiple case study design was used. This evaluation examined data from programs implemented in six communities located in New York (Broome County, Schenectady County, and New York City); California (Los Angeles County and Shasta County); and Kansas (Shawnee County). Participants (n = 80) included program staff, program directors, state-level staff, and partners. Measures for this evaluation included challenges, facilitators, and lessons learned from implementing sodium reduction strategies. The project team conducted a document review of program materials and semistructured interviews 12 to 14 months after implementation. The team coded and analyzed data deductively and inductively. Five lessons for implementing community-based sodium reduction approaches emerged: (1) build relationships with partners to understand their concerns, (2) involve individuals knowledgeable about specific venues early, (3) incorporate sodium reduction efforts and messaging into broader nutrition efforts, (4) design the program to reduce sodium gradually to take into account consumer preferences and taste transitions, and (5) identify ways to address the cost of lower-sodium products. The experiences of the six communities may assist practitioners in planning community-based sodium reduction interventions. Addressing sodium reduction using a community-based approach can foster meaningful change in dietary sodium consumption.

  8. Lessons learned from a great master!

    Directory of Open Access Journals (Sweden)

    Wagner Seixas da Silva

    2015-06-01

    Full Text Available Teaching Biochemistry is a huge challenge in the basic cycle of many undergraduate courses. How to convince students that this discipline is important for their academic degree so early in their college journeys? It may be hard to define in words a good teaching strategy for this purpose, but during the 70s'/80's a group of professors accepted this tough task! Professor Leopoldo de Meis paid particular attention to the way of teaching biochemistry. As a very sensitive person, he realized that the secret to a good teaching would be to keep the students motivated with doses of challenge.With this in mind, Prof. de Meis joined a small group of professors and graduate students from the former Department of Medical Biochemistry, now named Institute of Medical Biochemistry Leopoldo de Meis, at the Federal University of Rio de Janeiro, and proposed to use the Discovery learning method in classroom. The idea was to present the contents of the biochemistry course while challenging students to interpret the original data of the major biochemical findings. For this purpose, each biochemistry theme was shown through the experiments that led to the originally obtained conclusions currently present in the textbooks. Thus, students were motivated to ask questions and propose experiments that allow the interpretation of the scientists’ historical results. At first the methodology seemed very novel and difficult, but over the first few minutes the environment became a place for broad scientific discussion, where students enthusiastically participated and developed the ability to draw up the necessary questions to decipher the functioning of metabolic pathways. The parallel between the observed experimental facts and the physiological state of the experimental model used in classic experiments permitted the development of a broad and critical knowledge in the learning of biochemistry.To imagine that the students were motivated to develop the autonomy of

  9. Using Selective Redundancy and Testing to Optimize Learning from Multimedia Lessons

    OpenAIRE

    Yue, Carole Leigh

    2014-01-01

    Multimedia learning refers to learning from a combination of words and images. In the present dissertation, a multimedia lesson is defined as an animated, narrated educational video that depicts a scientific process--a format of instructional material becoming increasingly common in online, hybrid, and traditional classrooms. The overarching goal of the present research was to investigate how to optimize learning from multimedia lessons using two related theories of multimedia learning (the...

  10. ATLAS LTCS Vertically Challenged System Lessons Learned

    Science.gov (United States)

    Patel, Deepak; Garrison, Matt; Ku, Jentung

    2014-01-01

    Re-planning of LTCS TVAC testing and supporting RTA (Receiver Telescope Assembly) Test Plan and Procedure document preparation. The Laser Thermal Control System (LTCS) is designed to maintain the lasers onboard Advanced Topographic Laser Altimeter System (ATLAS) at their operational temperatures. In order to verify the functionality of the LTCS, a thermal balance test of the thermal hardware was performed. During the first cold start of the LTCS, the Loop Heat Pipe (LHP) was unable to control the laser mass simulators temperature. The control heaters were fully on and the loop temperature remained well below the desired setpoint. Thermal analysis of the loop did not show these results. This unpredicted behavior of the LTCS was brought up to a panel of LHP experts. Based on the testing and a review of all the data, there were multiple diagnostic performed in order to narrow down the cause. The prevailing theory is that gravity is causing oscillating flow within the loop, which artificially increased the control power needs. This resulted in a replan of the LTCS test flow and the addition of a GSE heater to allow vertical operation.

  11. Lessons learned from EU stress tests evaluations with regard to external hazards

    International Nuclear Information System (INIS)

    Misak, J.

    2014-01-01

    The presentation was oriented to critical review of the lessons learned from the European Union (EU) Stress Test focusing on NPP robustness against external hazards. These lessons addressed: - organization of the stress tests, - scope and objectives of the stress tests, - peer review findings, recommendations and implications on the design in the area of external hazards, - further studies recommended in the area of external hazards and PSA, - relevant research areas identified by the SNETP Task Group in response to Fukushima accident. Some important conclusions were made in the final part of the presentation: - Vulnerability to the Fukushima Dai-ichi reactor accidents caused by external hazards and including their secondary effects was underestimated, - Lessons learned from Fukushima Dai-ichi reactor accidents, from the EU Stress Test and from peer reviews are to be reflected in safety improvements of operating plants and considered in new designs, - while no completely new phenomena were revealed from the Fukushima Dai-ichi reactor accidents, improvements in specific research areas (including external hazards and use of PSA) should be considered with high priority

  12. Implementation of problem-based learning in geometry lessons

    Science.gov (United States)

    Ahamad, S. N. S. H.; Li, H.-C.; Shahrill, M.; Prahmana, R. C. I.

    2017-12-01

    The aim of this study is twofold. Firstly, it aims to examine the effects of the Problem-Based Learning (PBL) approach on students’ performance in the learning of geometry. Secondly, it seeks to gain insights from the students regarding the implementation of PBL in geometry lessons. The participants were 22 students from one Year 10 class in a co-educational secondary school in Brunei Darussalam. A mixed method design was employed with data collected from the pre-, post- and retention tests, and interviews. The findings from this study revealed positive influences on students’ performance in learning geometry as gain and retention of knowledge was observed. Meanwhile, mixed responses from the interviews implied that in terms of 1) learning attitudes, students favoured the idea of independent learning but some critiqued that the process of PBL might be time-consuming; 2) learning difficulties, some students struggled in assimilating information leading to poor decision- making; and 3) knowledge and skills, some students believed to have nurtured some skills such as communication and research skills.

  13. Saudi Vigilance Program: Challenges and lessons learned.

    Science.gov (United States)

    Alharf, Adel; Alqahtani, Nasser; Saeed, Ghazi; Alshahrani, Ali; Alshahrani, Mubarak; Aljasser, Nasser; Alquwaizani, Mohammed; Bawazir, Saleh

    2018-03-01

    Pharmacovigilance is vital to public health. Adopting a robust spontaneous reporting system for adverse drug events can counteract most hazards that arise from utilizing medicinal products. Prior to the establishment of the Saudi Food and Drug Authority (SFDA), the number of pharmacovigilance-related activities in Saudi Arabia was limited. In 2009, the SFDA established the National Pharmacovigilance and Drug Safety Center (Saudi Vigilance). The pharmacovigilance system has remarkably improved during the past few years. Several initiatives have been taken to improve the program's performance. These initiatives include initiation of pharmacovigilance guidelines, enhancement of communication and reporting tools, training sessions for concerned staff and healthcare providers, and compliance from stakeholders. This review article provides an overview of what the Saudi Vigilance program is, focusing on the scope, mission and vision, hierarchy, operational themes, and overall work processes. Additionally, we will shed light on the challenges we encountered during the early phase and on our future plans.

  14. Lessons learned from perinatal exposure to diethylstilbestrol

    Energy Technology Data Exchange (ETDEWEB)

    Newbold, Retha R

    2004-09-01

    The synthetic estrogen diethylstilbestrol (DES) is well documented to be a perinatal carcinogen in both humans and experimental animals. Exposure to DES during critical periods of differentiation permanently alters the programming of estrogen target tissues resulting in benign and malignant abnormalities in the reproductive tract later in life. Using the perinatal DES-exposed rodent model, cellular and molecular mechanisms have been identified that play a role in these carcinogenic effects. Although DES is a potent estrogenic chemical, effects of low doses of the compound are being used to predict health risks of weaker environmental estrogens. Therefore, it is of particular interest that developmental exposure to very low doses of DES has been found to adversely affect fertility and to increase tumor incidence in murine reproductive tract tissues. These adverse effects are seen at environmentally relevant estrogen dose levels. New studies from our lab verify that DES effects are not unique; when numerous environmental chemicals with weak estrogenic activity are tested in the experimental neonatal mouse model, developmental exposure results in an increased incidence of benign and malignant tumors including uterine leiomyomas and adenocarcinomas that are similar to those shown following DES exposure. Finally, growing evidence in experimental animals suggests that some adverse effects can be passed on to subsequent generations, although the mechanisms involved in these trans-generational events remain unknown. Although the complete spectrum of risks to DES-exposed humans are uncertain at this time, the scientific community continues to learn more about cellular and molecular mechanisms by which perinatal carcinogenesis occurs. These advances in knowledge of both genetic and epigenetic mechanisms will be significant in ultimately predicting risks to other environmental estrogens and understanding more about the role of estrogens in normal and abnormal development.

  15. Lessons learned from perinatal exposure to diethylstilbestrol

    International Nuclear Information System (INIS)

    Newbold, Retha R.

    2004-01-01

    The synthetic estrogen diethylstilbestrol (DES) is well documented to be a perinatal carcinogen in both humans and experimental animals. Exposure to DES during critical periods of differentiation permanently alters the programming of estrogen target tissues resulting in benign and malignant abnormalities in the reproductive tract later in life. Using the perinatal DES-exposed rodent model, cellular and molecular mechanisms have been identified that play a role in these carcinogenic effects. Although DES is a potent estrogenic chemical, effects of low doses of the compound are being used to predict health risks of weaker environmental estrogens. Therefore, it is of particular interest that developmental exposure to very low doses of DES has been found to adversely affect fertility and to increase tumor incidence in murine reproductive tract tissues. These adverse effects are seen at environmentally relevant estrogen dose levels. New studies from our lab verify that DES effects are not unique; when numerous environmental chemicals with weak estrogenic activity are tested in the experimental neonatal mouse model, developmental exposure results in an increased incidence of benign and malignant tumors including uterine leiomyomas and adenocarcinomas that are similar to those shown following DES exposure. Finally, growing evidence in experimental animals suggests that some adverse effects can be passed on to subsequent generations, although the mechanisms involved in these trans-generational events remain unknown. Although the complete spectrum of risks to DES-exposed humans are uncertain at this time, the scientific community continues to learn more about cellular and molecular mechanisms by which perinatal carcinogenesis occurs. These advances in knowledge of both genetic and epigenetic mechanisms will be significant in ultimately predicting risks to other environmental estrogens and understanding more about the role of estrogens in normal and abnormal development

  16. Six Lessons We Learned Applying Six Sigma

    Science.gov (United States)

    Carroll, Napoleon; Casleton, Christa H.

    2005-01-01

    As Chief Financial Officer of Kennedy Space Center (KSC), I'm not only responsible for financial planning and accounting but also for building strong partnerships with the CFO customers, who include Space Shuttle and International Space Station operations as well all who manage the KSC Spaceport. My never ending goal is to design, manage and continuously improve our core business processes so that they deliver world class products and services to the CFO's customers. I became interested in Six Sigma as Christa Casleton (KSC's first Six Sigma Black belt) applied Six Sigma tools and methods to our Plan and Account for Travel Costs Process. Her analysis was fresh, innovative and thorough but, even more impressive, was her approach to ensure ongoing, continuous process improvement. Encouraged by the results, I launched two more process improvement initiatives aimed at applying Six Sigma principles to CFO processes that not only touch most of my employees but also have direct customer impact. As many of you know, Six Sigma is a measurement scale that compares the output of a process with customer requirements. That's straight forward, but demands that you not only understand your processes but also know your products and the critical customer requirements. The objective is to isolate and eliminate the causes of process variation so that the customer sees consistently high quality.

  17. Oleoducto Carrasco Cochabamba OCC - lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Chavarria, Edwin; Collazos, Alfonso; Blanco, Ernesto [TRANSREDES S.A. (Bolivia)

    2005-07-01

    This article describes the challenges and activities performed to place 'in service' condition a pipeline that was constructed in 2001, that was never placed in service, and further, in 2003, suffered the loss of 3 river crossings (80, 120, and 300 meters wide), in addition to several damages to the pipeline in 17 different locations. The project's execution was divided into two phases. Phase 1, Emergency Shut Down (ESD) in the four pipeline stations; Installing Remote Operated Valves (ROV); ROW repairs; Equipment's Mechanical and Instrument and Electric/electronic maintenance. Phase 2, Complementary pipeline and ROW stabilization tasks, pipeline burial and river crossings; Geometric internal inspections and repairs; Intelligent inspection; Leak Detection System (LDS); fuel consumption performance improvements. The pipeline has 4 stations; the first, second, and third are pumping stations. The pipeline is located in part of a national park with high environmental and social risks. Considering its geographical condition, the location's area is considered to be within the five locations in the world that have the highest accumulated rains with its 5570 mm of annual precipitation; it has 70 river crossings (22 aerial bridges, 22 buried river crossings, and 22 river crossings attached to road bridges); the overall length is 250 Km, part of the area is geologically active; the profile starts at 400 masl, then down to 250 masl up to 3700 masl. (author)

  18. Learning fire-fighting lessons after Chernobyl

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Fire protection measures in Soviet nuclear power plants were set out in November 1987, in the Nuclear Power Plant Design Fire Protection Standards (VSN 01-87, USSR Ministry of Atomic Energy). The most important of these measures are. Avoiding as far as possible the use of combustible materials in plant structures and equipment. Dividing buildings and areas into suitable fire-fighting zones. Ensuring reliable fire protection of the control and safety systems. Protecting technical personnel from the dangers of a fire while they are performing essential accident-repair work and facilitating evacuation procedures (providing at least two evacuation routes and exits, anti-smoke protection of evacuation routes and control panel areas etc). Installing automatic fire-extinguishing and fire alarm systems. Providing various stationary facilities and equipment to assist the use of mobile fire-fighting appliances. In addition, a special fire-fighting division is being set up in every nuclear power plant while the first unit is still being constructed. These divisions work in close co-operation with the technical personnel management of the plant and with the bodies responsible for monitoring nuclear safety. (author)

  19. Cybernetic Service-Learning Course Development: Lessons Learned

    Science.gov (United States)

    Marx, Jonathan I.; Miller, Lee Q.

    2009-01-01

    Although the title of the course, Combating Loneliness among Older People in Contemporary Society, states a clear goal, our service-learning class was shaped by five guiding parameters. By avoiding certain things, we allowed the course to self-organize and evolve into a learning experience beyond the one originally envisioned. This paper…

  20. "Involvement in Learning" Revisited: Lessons We Have Learned.

    Science.gov (United States)

    Astin, Alexander W.

    1999-01-01

    Originally published in March/April 1996, reviews the interconnections between two national reports, "Involvement in Learning," and the "Student Learning Imperative." Focuses on the issue of shared values and demonstrates how student affairs professionals can utilize the most recent research to realize the full potential of the…

  1. Risk perception and risk communication: lessons learned

    International Nuclear Information System (INIS)

    Baillif, L.; Sackur, J.

    1998-01-01

    Industry can master risks but it cannot master the representations people have of these risks. This is why distortions may occur, as the public perceives risks where they are not, or in a totally deformed way. To deal with this type of situation which is dangerous in the long run, both for society and industry, it is necessary to study in detail where and how the difference between real risks and perceived risks is introduced. It then becomes possible to determine what means of action are available to manage the representations and the perceptions of risks. We shall mention two rather different examples of type of direct contact with the industrial reality; in France, we have determined policy of visits of nuclear sites (more than 10 000 people visit Cogema- la Hague site yearly), mainly addressed to school children and people living in the vicinity of the site. During these visits there is of course no question of explaining the detailed operation of the facility or the risks it generates. The purpose is to make the representation of the nuclear industry just as familiar as the representation of another large-scale technology tool: trains, dams,. In a different manner, missions are organised by Cogema - B.N.F.L.- O.R.C. (Overseas reprocessing Committee) to de dramatize the transport of high level vitrified wastes from Europe to Japan. these missions travel through those countries the ship come close to. Here, again, although the target is more the relays of opinion, the effective presence of specialized transport ship is a crucial element in putting a halt to phantasmic representations, as they are born from the remoteness of the object. (N.C.)

  2. Lessons from school: what nurse leaders can learn from education.

    Science.gov (United States)

    Davies, Nigel

    2015-07-01

    The drive to improve quality in the education sector is similar to that in health care, and lessons from the schools system are relevant to nursing leadership. This article discusses these shared traits, and details how school improvement was achieved in London and how a model of learning-centred leadership helped to transform pupil attainment in schools that had been performing poorly. Parallels are drawn between the education inspection system undertaken by Ofsted and the hospital inspections undertaken by the Care Quality Commission, and between the practice discipline-based managerial roles of nurse directors and head teachers. The article suggests that a learning-centred approach to improving the quality of patient care is needed, with a focus on the education and continuing professional development of staff.

  3. User observations on information sharing (corporate knowledge and lessons learned)

    Science.gov (United States)

    Montague, Ronald A.; Gregg, Lawrence A.; Martin, Shirley A.; Underwood, Leroy H.; Mcgee, John M.

    1993-01-01

    The sharing of 'corporate knowledge' and lessons learned in the NASA aerospace community has been identified by Johnson Space Center survey participants as a desirable tool. The concept of the program is based on creating a user friendly information system that will allow engineers, scientists, and managers at all working levels to share their information and experiences with other users irrespective of location or organization. The survey addresses potential end uses for such a system and offers some guidance on the development of subsequent processes to ensure the integrity of the information shared. This system concept will promote sharing of information between NASA centers, between NASA and its contractors, between NASA and other government agencies, and perhaps between NASA and institutions of higher learning.

  4. Lessons learned from the PMI case study: the community perspective.

    Science.gov (United States)

    Hare, M L; Orians, C E; Kennedy, M G; Goodman, K J; Wijesinha, S; Seals, B F

    2000-03-01

    This summary report presents the lessons learned during the two-part qualitative case study on the efficacy of the Prevention Marketing Initiative (PMI) in its implementation of an HIV prevention program. About 179 community participants were included in the PMI program, which discussed topics ranging from organizing initial planning committees to financially sustaining federal demonstration programs. One of the successes observed was the development of rapport with schools and churches; however, during the course of its implementation, the program realized the necessity of 1) approaching the program as an ongoing process; 2) going beyond studying the target population through formative research; 3) changing the role of a community coalition as the project matures; 4) reexamining the composition of coalition in the light of the target audience; 5) advocating the project as a community resource that promotes collaboration; 6) attending the needs of coalition members; and 7) using the media in the campaign. Likewise, several lessons were also learned in the areas of youth involvement, intervention development, program implementation, and maintenance of PMI activities.

  5. Psychosocial Rehabilitation: Some Lessons Learned From Natural Disaster in Iran

    Directory of Open Access Journals (Sweden)

    Fardin Alipour

    2016-01-01

    Full Text Available Background: Disasters have adverse impacts on different aspects of human life. Psychosocial Rehabilitation is one of the fields which is usually overshadowed and ignored by physical rehabilitation or its importance does not receive proper attention. This research attempts to study some lessons learned from Psychosocial Rehabilitation based on disaster experiences in Iran. Materials and Methods: This study has a conventional qualitative content analysis design. The participants of study were 15 people with direct experience of earthquake and 12 experts in this field. The study sample was selected by purposeful sampling method and the data were collected by semi-structured interviews. Results: Lack of a suitable system to deliver Psychosocial Rehabilitation, challenge in establishing balance between short-term and long-term social and mental needs, lack of mental and social experts, inefficiency in using social capital and capacities are the most important lessons learned in this field. Conclusion: Lack of awareness of mental and social problems of affected people after disaster is one of the most important barriers in successful and stable rehabilitation. Psychosocial Rehabilitation requires a suitable structure and planning for all stages of disaster management.

  6. Lessons learned by southern states in designating alternative routes

    International Nuclear Information System (INIS)

    1989-08-01

    The purpose of this report is to discuss the ''lessons learned'' by the five states within the southem region that have designated alternative or preferred routes under the regulations of the Department of Transportation (DOT) established for the transportation of radioactive materials. The document was prepared by reviewing applicable federal laws and regulations, examining state reports and documents and contacting state officials and routing agencies involved in making routing decisions. In undertaking this project, the Southern States Energy Board hopes to reveal the process used by states that have designated alternative routes and thereby share their experiences (i.e., lessons learned) with other southern states that have yet to make designations. Under DOT regulations (49 CFR 177.826), carriers of highway route controlled quantities of radioactive materials (which include spent nuclear fuel and high-level waste) must use preferred routes selected to reduce time in transit. Such preferred routes consist of (1) an interstate system highway with use of an interstate system bypass or beltway around cities when available, and (2) alternate routes selected by a ''state routing agency.''

  7. How Do Lessons Learned on the International Space Station (ISS) Help Plan Life Support for Mars?

    Science.gov (United States)

    Jones, Harry W.; Hodgson, Edward W.; Gentry, Gregory J.; Kliss, Mark H.

    2016-01-01

    How can our experience in developing and operating the International Space Station (ISS) guide the design, development, and operation of life support for the journey to Mars? The Mars deep space Environmental Control and Life Support System (ECLSS) must incorporate the knowledge and experience gained in developing ECLSS for low Earth orbit, but it must also meet the challenging new requirements of operation in deep space where there is no possibility of emergency resupply or quick crew return. The understanding gained by developing ISS flight hardware and successfully supporting a crew in orbit for many years is uniquely instructive. Different requirements for Mars life support suggest that different decisions may be made in design, testing, and operations planning, but the lessons learned developing the ECLSS for ISS provide valuable guidance.

  8. WHY CANT WE LEARN FROM OUR MISTAKES LEARN THE LESSON TELL THE STORY

    International Nuclear Information System (INIS)

    LANGSTAFF, D.C.

    2005-01-01

    Tell the story well and people can learn from the lesson. The United States Department of Energy (DOE) Office of Environmental Management (EM) and its contractors are pursuing environmental remediation at the Hanford Site. This endeavor has been underway for a number of years, both at Hanford and at other sites across the DOE complex. Independently, the occurrence of two fatalities on two Sites at opposite ends of the country within two weeks raised the question, ''What is going on in the Field?'' Corporate EM management communicated directly with Field Office Managers to answer the question. As a result of this intense interest and focused communication, EM identified four areas that need additional exploration. One of those is, ''EM's ability to learn from its mistakes.'' The need to cultivate the ability to learn from our mistakes is not unique to DOE. A quick review of EM Lessons Learned reports shows that most of the reports in the EM system originate at the sites with the largest budgets doing the most work. Not surprising. A second look, however, reveals that many reports are repetitive, that many people might consider many reports trivial, and that reports on some of the more significant events sometimes take a long time to get distributed across the DOE Complex. Spot checks of event reports revealed frequent identification of symptoms rather than root causes. With a high percentage of identified root causes in the questionable category, it is highly unlikely that the real root causes of many events are being corrected, thus leading to recurrences of events. To learn the lesson from an event, people need to be aware of the root causes of the event. Someone has to tell a story the reader can learn from, i.e., include all the information needed to understand what happened and why it happened. Most importantly, they need to understand the lesson to be learned

  9. Expensive, Frustrating and Perilous: Lessons Learned from Charting New Waters in Liberalized Markets

    Energy Technology Data Exchange (ETDEWEB)

    Hastings, Matthew T.

    2007-07-01

    By 2030 utilities will have spent billions in investment to maintain, upgrade and expand their infrastructure. To attract investment utilities operating in liberalized markets will increasingly be required to report, perform and operate in ways that are very different from the current. Market liberalization, or deregulation, of the electricity sector has been an ongoing process in the United States for almost two decades. Every single element of utility management, operations and finance has changed dramatically and irrevocably. Building and maintaining investor confidence in the utility sector will be an ongoing challenge for every individual player. The US experience has demonstrated that open markets are much less tolerant of management missteps and failures to reach stated goals and objectives. The US experience has resulted in a range of ''lessons learned'' that will be of interest to market players as they develop and implement strategies to build and maintain competitive position. This paper discusses elements of the US experience, and the pursuant opportunities for international players to benefit from, the expensive and often times painful ''lessons learned''. (auth)

  10. Medical support to Sri Lanka in the wake of tsunamis: planning considerations and lessons learned.

    Science.gov (United States)

    Lane, David A

    2006-10-01

    When massive tsunamis affected the coast of Sri Lanka and other Indian Ocean littorals, elements of the Third Force Service Support Group and assigned Navy, Air Force, Army, and Coast Guard units from the U.S. Pacific Command were "task organized" to form Combined Support Group-Sri Lanka (CSG-SL), charged to conduct humanitarian assistance/disaster relief (HA/DR) operations. The specific mission was to provide immediate relief to the affected population of Sri Lanka and the Maldives, to minimize loss of life, and to mitigate human suffering. A 30-person health care team deployed to the northern province of Jaffna and provided medical assistance to that chronically underserved and acutely overstressed region. For a 12-day period, the team served as the principal medical staff of an under-resourced government hospital and conducted mobile primary care clinics at nearby welfare camps housing > 7,000 internally displaced persons made homeless by the tsunamis. By every measurable standard, CSG-SL accomplished its assigned HA/DR task in Sri Lanka, including the medical mission. In doing so, the medical team learned many important lessons, including five of particular value to planners of similar relief operations in the future. This article discusses the context in which CSG-SL planned and executed the medical aspects of its HA/DR operations in Sri Lanka, and it describes the most significant medical lessons learned.

  11. Hazard assessment for small torrent catchments - lessons learned

    Science.gov (United States)

    Eisl, Julia; Huebl, Johannes

    2013-04-01

    for sediment retention. As far as the transport capacity of the lower reaches is limited a balance had to be found between protection on the one hand and sediment connectivity to the Wölzer-river on the other. The lessons learned kicked off discussions for future hazard assessment especially concerning the use of rainfall data and design precipitation values for small torrent catchments. Also the comparison with empirical values showed the need for differentiated concepts for hazard analysis. Therefor recommendations for the use of spatial rainfall reduction factors as well as the demarcation of hazard maps using different event scenarios are proposed.

  12. Lesson learned from the SARNET wall condensation benchmarks

    International Nuclear Information System (INIS)

    Ambrosini, W.; Forgione, N.; Merli, F.; Oriolo, F.; Paci, S.; Kljenak, I.; Kostka, P.; Vyskocil, L.; Travis, J.R.; Lehmkuhl, J.; Kelm, S.; Chin, Y.-S.; Bucci, M.

    2014-01-01

    Highlights: • The results of the benchmarking activity on wall condensation are reported. • The work was performed in the frame of SARNET. • General modelling techniques for condensation are discussed. • Results of University of Pisa and of other benchmark participants are discussed. • The lesson learned is drawn. - Abstract: The prediction of condensation in the presence of noncondensable gases has received continuing attention in the frame of the Severe Accident Research Network of Excellence, both in the first (2004–2008) and in the second (2009–2013) EC integrated projects. Among the different reasons for considering so relevant this basic phenomenon, coped with by classical treatments dated in the first decades of the last century, there is the interest for developing updated CFD models for reactor containment analysis, requiring validating at a different level the available modelling techniques. In the frame of SARNET, benchmarking activities were undertaken taking advantage of the work performed at different institutions in setting up and developing models for steam condensation in conditions of interest for nuclear reactor containment. Four steps were performed in the activity, involving: (1) an idealized problem freely inspired at the actual conditions occurring in an experimental facility, CONAN, installed at the University of Pisa; (2) a first comparison with experimental data purposely collected by the CONAN facility; (3) a second comparison with data available from experimental campaigns performed in the same apparatus before the inclusion of the activities in SARNET; (4) a third exercise involving data obtained at lower mixture velocity than in previous campaigns, aimed at providing conditions closer to those addressed in reactor containment analyses. The last step of the benchmarking activity required to change the configuration of the experimental apparatus to achieve the lower flow rates involved in the new test specifications. The

  13. Improving Software Sustainability: Lessons Learned from Profiles in Science.

    Science.gov (United States)

    Gallagher, Marie E

    2013-01-01

    . Sometimes these changes happen on short notice, so we continually monitor our library's software for signs of endangerment. We have attempted to replace proprietary software with suitable in-house or open source software. When the replacement involves a standalone piece of software with a nearly equivalent version, such as replacing a commercial HTTP server with an open source HTTP server, the replacement is straightforward. Recently we replaced software that functioned not only as our search engine but also as the backbone of the architecture of our Web site. In this paper, we describe the lessons learned and the pros and cons of replacing this software with open source software.

  14. Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

    International Nuclear Information System (INIS)

    Kumthekar, U.A.; Chiou, J.D.

    2006-01-01

    The On-Site Disposal Facility (OSDF) at the U.S. Department of Energy's (DOE) Fernald Closure Project near Cincinnati, Ohio is an engineered above-grade waste disposal facility being constructed to permanently store low level radioactive waste (LLRW) and treated mixed LLRW generated during Decommissioning and Demolition (D and D) and soil remediation performed in order to achieve the final land use goal at the site. The OSDF is engineered to store 2.93 million cubic yards of waste derived from the remediation activities. The OSDF is intended to isolate its LLRW from the environment for at least 200 years and for up to 1,000 years to the extent practicable and achievable. Construction of the OSDF started in 1997 and waste placement activities will complete by the middle of April 2006 with the final cover (cap) placement over the last open cell by the end of Spring 2006. An on-site disposal alternative is considered critical to the success of many large-scale DOE remediation projects throughout the United States. However, for various reasons this cost effective alternative is not readily available in many cases. Over the last ten years Fluor Fernald Inc. has cumulated many valuable lessons learned through the complex engineering, construction, operation, and closure processes of the OSDF. Also in the last several years representatives from other DOE sites, State agencies, as well as foreign government agencies have visited the Fernald site to look for proven experiences and practices, which may be adapted for their sites. This paper present a summary of the major issues and lessons leaned at the Fernald site related to engineering, construction, operation, and closure processes for the disposal of remediation waste. The purpose of this paper is to share lessons learned and to benefit other projects considering or operating similar on-site disposal facilities from our successful experiences. (authors)

  15. Unintended Learning in Primary School Practical Science Lessons from Polanyi's Perspective of Intellectual Passion

    Science.gov (United States)

    Park, Jisun; Song, Jinwoong; Abrahams, Ian

    2016-01-01

    This study explored, from the perspective of intellectual passion developed by Michael Polanyi, the unintended learning that occurred in primary practical science lessons. We use the term "unintended" learning to distinguish it from "intended" learning that appears in teachers' learning objectives. Data were collected using…

  16. Involving users with learning difficulties in health improvement: lessons from inclusive learning disability research.

    Science.gov (United States)

    Walmsley, Jan

    2004-03-01

    In this paper the author considers the lessons to be drawn from what is termed "inclusive" learning disability research for user involvement around health improvement. Inclusive learning disability research refers to research where people with learning difficulties (intellectual disability) are involved as active participants, as opposed to passive subjects. There is by now a considerable body of such research, developed over the past 25 years. From the review, the author draws attention to areas which can inform practice in involvement of users in a way that adds value.

  17. Learning on governance in forest ecosystems: Lessons from recent research

    Directory of Open Access Journals (Sweden)

    Catherine May Tucker

    2010-09-01

    Full Text Available Research on forest governance has intensified in recent decades with evidence that efforts to mitigate deforestation and encourage sustainable management have had mixed results. This article considers the progress that has been made in understanding the range of variation in forest governance and management experiences. It synthesizes findings of recent interdisciplinary research efforts, with particular attention to work conducted through the Center for the Study of Institutions, Population and Environmental Change and the International Forestry Resources and Institution Research Program. By identifying areas of progress, lessons learned, and challenges for successful forest governance, the discussion points to policy implications and priorities for research.Research on forest governance has intensified in recent decades with evidence that efforts to mitigate deforestation and encourage sustainable management have had mixed results. This article considers the progress that has been made in understanding the range of variation in forest governance and management experiences. It synthesizes findings of recent interdisciplinary research efforts, which indicate that sustainable management of forest resources is associated with secure rights, institutions that fit the local context, and monitoring and enforcement. At the same time, the variability in local contexts and interactions of social, political, economic and ecological processes across levels and scales of analysis create uncertainties for the design and maintenance of sustainable forest governance.  By identifying areas of progress, lessons learned, and gaps in knowledge, the discussion suggests priorities for further research.Research on forest governance has intensified in recent decades with evidence that efforts to mitigate deforestation and encourage sustainable management have had mixed results. This article considers the progress that has been made in understanding the range of

  18. Assessing environmental impacts of offshore wind farms: lessons learned and recommendations for the future.

    Science.gov (United States)

    Bailey, Helen; Brookes, Kate L; Thompson, Paul M

    2014-01-01

    Offshore wind power provides a valuable source of renewable energy that can help reduce carbon emissions. Technological advances are allowing higher capacity turbines to be installed and in deeper water, but there is still much that is unknown about the effects on the environment. Here we describe the lessons learned based on the recent literature and our experience with assessing impacts of offshore wind developments on marine mammals and seabirds, and make recommendations for future monitoring and assessment as interest in offshore wind energy grows around the world. The four key lessons learned that we discuss are: 1) Identifying the area over which biological effects may occur to inform baseline data collection and determining the connectivity between key populations and proposed wind energy sites, 2) The need to put impacts into a population level context to determine whether they are biologically significant, 3) Measuring responses to wind farm construction and operation to determine disturbance effects and avoidance responses, and 4) Learn from other industries to inform risk assessments and the effectiveness of mitigation measures. As the number and size of offshore wind developments increases, there will be a growing need to consider the population level consequences and cumulative impacts of these activities on marine species. Strategically targeted data collection and modeling aimed at answering questions for the consenting process will also allow regulators to make decisions based on the best available information, and achieve a balance between climate change targets and environmental legislation.

  19. Lesson Study-Building Communities of Learning Among Pre-Service Science Teachers

    Science.gov (United States)

    Hamzeh, Fouada

    Lesson Study is a widely used pedagogical approach that has been used for decades in its country of origin, Japan. It is a teacher-led form of professional development that involves the collaborative efforts of teachers in co-planning and observing the teaching of a lesson within a unit for evidence that the teaching practices used help the learning process (Lewis, 2002a). The purpose of this research was to investigate if Lesson Study enables pre-service teachers to improve their own teaching in the area of science inquiry-based approaches. Also explored are the self-efficacy beliefs of one group of science pre-service teachers related to their experiences in Lesson Study. The research investigated four questions: 1) Does Lesson Study influence teacher preparation for inquiry-based instruction? 2) Does Lesson Study improve teacher efficacy? 3) Does Lesson Study impact teachers' aspiration to collaborate with colleagues? 4) What are the attitudes and perceptions of pre-service teachers to the Lesson Study idea in Science? The 12 participants completed two pre- and post-study surveys: STEBI- B, Science Teaching Efficacy Belief Instrument (Enochs & Riggs, 1990) and ASTQ, Attitude towards Science Teaching. Data sources included student teaching lesson observations, lesson debriefing notes and focus group interviews. Results from the STEBI-B show that all participants measured an increase in efficacy throughout the study. This study added to the body of research on teaching learning communities, professional development programs and teacher empowerment.

  20. Massachusetts nuclear power referendum: Lessons learned from the campaign trail

    International Nuclear Information System (INIS)

    Allen, S.R.

    1989-01-01

    Last November, Massachusetts voters cast their ballots on a binding initiative which, if passed, would have prohibited the production of high-level waste, thereby permanently shutting down the state's two nuclear power plants: Yankee and Pilgrim. Question 4, as the initiative became known, posed an unprecedented challenge for the state's six major utilities. Essentially, Question 4 was defeated for two reasons: compelling arguments and a well-founded strategy for communicating those arguments. One part of that strategy was the use of debates and public-speaking engagements before both civic groups and on radio/television. These debates and presentations were clearly the most interesting part of the campaign and provided many insights that may be applied to long-term public policy and informational programs. Obviously, there is a significant difference between an intense, focused campaign and an ongoing, diverse public information program-but many of the principles are the same. The purpose of this paper is to review some of the key lessons learned from over 300 debates and presentations in the highly emotional atmosphere of the Question 4 campaign. Throughout the campaign, debaters and speakers submitted after action reports, and it is from these as well as the overall campaign results that the lessons and anecdotes are derived

  1. Lessons learned from completed evaluation reviews (1983 to mid-1993). Special evaluation review

    International Nuclear Information System (INIS)

    1993-01-01

    With this in mind, the Agency in 1983 set up in the Department of Technical Co-operation an Evaluation Unit (upgraded to Section rank in 1986), to assist already existing self-evaluation efforts through a more systematic and independent approach and thus provide senior management with the information required for more efficient and effective programme planning and implementation. A first analysis of the lessons learned through technical co-operation evaluation was carried out after five years, in mid-1988. It included both lessons learned with regard to the procedures and components of the programme, in general, as well as the findings specific to individual projects or groups of projects, and reported on the resulting administrative changes introduced by the Agency with a view to improving the programme. The current review, covering the second five-year period, from mid-1988 to mid-1993, continued along the same lines, while also illustrating the changing pattern in the work of the Evaluation Section itself. In order to present a full picture of the activities and results of ten years of TC evaluation, this report combines the results of both reviews

  2. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  3. Lessons Learned Following the Successful Decommissioning of a Reaction Vessel Containing Lime Sludge and Technetium-99

    International Nuclear Information System (INIS)

    Dawson, P. M.; Watson, D. D.; Hylko, J. M.

    2002-01-01

    This paper documents how WESKEM, LLC utilized available source term information, integrated safety management, and associated project controls to safely decommission a reaction vessel and repackage sludge containing various Resource Conservation and Recovery Act constituents and technetium-99 (Tc-99). The decommissioning activities were segmented into five separate stages, allowing the project team to control work related decisions based on their knowledge, experience, expertise, and field observations. The information and experience gained from each previous stage and rehearsals contributed to modifying subsequent entries, further emphasizing the importance of developing hold points and incorporating lessons learned. The hold points and lessons learned, such as performing detailed personal protective equipment (PPE) inspections during sizing and repackaging operations, and using foam-type piping insulation to prevent workers from cutting or puncturing their PPE on sharp edge s or small shards generated during sizing operations, minimized direct contact with the Tc-99. To prevent the spread of contamination, the decommissioning activities were performed inside a containment enclosure connected to negative air machines. After performing over 235 individual entries totaling over 285 project hours, only one first aid was recorded during this five-stage project

  4. Development of a public health reporting data warehouse: lessons learned.

    Science.gov (United States)

    Rizi, Seyed Ali Mussavi; Roudsari, Abdul

    2013-01-01

    Data warehouse projects are perceived to be risky and prone to failure due to many organizational and technical challenges. However, often iterative and lengthy processes of implementation of data warehouses at an enterprise level provide an opportunity for formative evaluation of these solutions. This paper describes lessons learned from successful development and implementation of the first phase of an enterprise data warehouse to support public health surveillance at British Columbia Centre for Disease Control. Iterative and prototyping approach to development, overcoming technical challenges of extraction and integration of data from large scale clinical and ancillary systems, a novel approach to record linkage, flexible and reusable modeling of clinical data, and securing senior management support at the right time were the main factors that contributed to the success of the data warehousing project.

  5. Lessons learned from nuclear power plant posttrip monitoring systems

    International Nuclear Information System (INIS)

    Barasa, W.A.

    1989-01-01

    This paper discusses a program to identify common causes of unit trips and cost-effective evaluation of the options for addressing the causes. The core of the program is a living historical data base of events, based on root-cause analysis of station-specific events, that provides a means of segregating common-cause failures from random failures. Once common-cause failures at a specific plant are identified, the payback periods of the options to address a specific unit trip cause - modification, procedural changes, or status quo - can be calculated by comparing the cost of the modifications with the cost of the lost electrical production, which is also determined from the historical data base. This paper describes how the information is developed and gives examples of how the lessons learned from previous trips can be applied to the elimination of the causes

  6. Alzheimer's Disease: Lessons Learned from Amyloidocentric Clinical Trials.

    Science.gov (United States)

    Soejitno, Andreas; Tjan, Anastasia; Purwata, Thomas Eko

    2015-06-01

    Alzheimer's disease (AD) is one of the most debilitating neurodegenerative diseases and is predicted to affect 1 in 85 people by 2050. Despite much effort to discover a therapeutic strategy to prevent progression or to cure AD, to date no effective disease-modifying agent is available that can prevent, halt, or reverse the cognitive and functional decline of patients with AD. Several underlying etiologies to this failure are proposed. First, accumulating evidence from past trials suggests a preventive as opposed to therapeutic paradigm, and the precise temporal and mechanistic relationship of β-amyloid (Aβ) and tau protein should be elucidated to confirm this hypothesis. Second, we are in urgent need of revised diagnostic criteria to support future trials. Third, various technical and methodological improvements are required, based on the lessons learned from previous failed trials.

  7. Lessons learned in managing crowdsourced data in the Alaskan Arctic.

    Science.gov (United States)

    Mastracci, Diana

    2017-04-01

    There is perhaps no place in which the consequences of global climate change can be felt more acutely than the Arctic. However, due to lack of measurements at the high latitudes, validation processes are often problematic. Citizen science projects, co-designed together with Native communities at the interface of traditional knowledge and scientific research, could play a major role in climate change adaptation strategies by advancing knowledge of the Arctic system, strengthening inter-generational bonds and facilitating improved knowledge transfer. This presentation will present lessons learned from a pilot project in the Alaskan Arctic, in which innovative approaches were used to design climate change adaptation strategies to support young subsistence hunters in taking in-situ measurements whilst out on the sea-ice. Both the socio-cultural and hardware/software challenges presented in this presentation, could provide useful guidance for future programs that aim to integrate citizens' with scientific data in Arctic communities.

  8. [Managing digital medical imaging projects in healthcare services: lessons learned].

    Science.gov (United States)

    Rojas de la Escalera, D

    2013-01-01

    Medical imaging is one of the most important diagnostic instruments in clinical practice. The technological development of digital medical imaging has enabled healthcare services to undertake large scale projects that require the participation and collaboration of many professionals of varied backgrounds and interests as well as substantial investments in infrastructures. Rather than focusing on systems for dealing with digital medical images, this article deals with the management of projects for implementing these systems, reviewing various organizational, technological, and human factors that are critical to ensure the success of these projects and to guarantee the compatibility and integration of digital medical imaging systems with other health information systems. To this end, the author relates several lessons learned from a review of the literature and the author's own experience in the technical coordination of digital medical imaging projects. Copyright © 2012 SERAM. Published by Elsevier Espana. All rights reserved.

  9. Lessons Learned From Developing Reactor Pressure Vessel Steel Embrittlement Database

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jy-An John [ORNL

    2010-08-01

    Materials behaviors caused by neutron irradiation under fission and/or fusion environments can be little understood without practical examination. Easily accessible material information system with large material database using effective computers is necessary for design of nuclear materials and analyses or simulations of the phenomena. The developed Embrittlement Data Base (EDB) at ORNL is this comprehensive collection of data. EDB database contains power reactor pressure vessel surveillance data, the material test reactor data, foreign reactor data (through bilateral agreements authorized by NRC), and the fracture toughness data. The lessons learned from building EDB program and the associated database management activity regarding Material Database Design Methodology, Architecture and the Embedded QA Protocol are described in this report. The development of IAEA International Database on Reactor Pressure Vessel Materials (IDRPVM) and the comparison of EDB database and IAEA IDRPVM database are provided in the report. The recommended database QA protocol and database infrastructure are also stated in the report.

  10. Lessons learned: advantages and disadvantages of mixed method research

    DEFF Research Database (Denmark)

    Malina, Mary A.; Nørreklit, Hanne; Selto, Frank H.

    2011-01-01

    on the use and usefulness of a specialized balanced scorecard; and third, to encourage researchers to actually use multiple methods and sources of data to address the very many accounting phenomena that are not fully understood. Design/methodology/approach – This paper is an opinion piece based...... on the authors' experience conducting a series of longitudinal mixed method studies. Findings – The authors suggest that in many studies, using a mixed method approach provides the best opportunity for addressing research questions. Originality/value – This paper provides encouragement to those who may wish......Purpose – The purpose of this paper is first, to discuss the theoretical assumptions, qualities, problems and myopia of the dominating quantitative and qualitative approaches; second, to describe the methodological lessons that the authors learned while conducting a series of longitudinal studies...

  11. Lessons learned from different approaches towards classifying personal factors.

    Science.gov (United States)

    Müller, Rachel; Geyh, Szilvia

    2015-01-01

    To examine and compare existing suggestions towards a classification of Personal Factors (PF) of the International Classification of Functioning, Disability and Health (ICF). Qualitative and quantitative content analyses of available categorizations of PF are conducted. While the eight categorizations greatly differ in their background and structure, the broad content areas covered seem to be similar and reflect the ICF definition of PF. They cover to various degrees 12 broad content areas: socio-demographic factors, behavioral and lifestyle factors, cognitive psychological factors, social relationships, experiences and biography, coping, emotional factors, satisfaction, other health conditions, biological/physiological factors, personality, motives/motivation. In comparing these categorizations, a common core of content issues for a potential ICF PF classification could be identified and valuable lessons learned. This can contribute to future classification development activities in relation to PF.

  12. Small grant management in health and behavioral sciences: Lessons learned.

    Science.gov (United States)

    Sakraida, Teresa J; D'Amico, Jessica; Thibault, Erica

    2010-08-01

    This article describes considerations in health and behavioral sciences small grant management and describes lessons learned during post-award implementation. Using the components by W. Sahlman [Sahlman, W. (1997). How to write a great business plan. Harvard Business Review, 75(4), 98-108] as a business framework, a plan was developed that included (a) building relationships with people in the research program and with external parties providing key resources, (b) establishing a perspective of opportunity for research advancement, (c) identifying the larger context of scientific culture and regulatory environment, and (d) anticipating problems with a flexible response and rewarding teamwork. Small grant management included developing a day-to-day system, building a grant/study program development plan, and initiating a marketing plan. Copyright 2010 Elsevier Inc. All rights reserved.

  13. Conservation Genetics of the Cheetah: Lessons Learned and New Opportunities.

    Science.gov (United States)

    O'Brien, Stephen J; Johnson, Warren E; Driscoll, Carlos A; Dobrynin, Pavel; Marker, Laurie

    2017-09-01

    The dwindling wildlife species of our planet have become a cause célèbre for conservation groups, governments, and concerned citizens throughout the world. The application of powerful new genetic technologies to surviving populations of threatened mammals has revolutionized our ability to recognize hidden perils that afflict them. We have learned new lessons of survival, adaptation, and evolution from viewing the natural history of genomes in hundreds of detailed studies. A single case history of one species, the African cheetah, Acinonyx jubatus, is here reviewed to reveal a long-term story of conservation challenges and action informed by genetic discoveries and insights. A synthesis of 3 decades of data, interpretation, and controversy, capped by whole genome sequence analysis of cheetahs, provides a compelling tale of conservation relevance and action to protect this species and other threatened wildlife. © The American Genetic Association 2017. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  14. Lessons learned from the non-proliferation experiment

    Energy Technology Data Exchange (ETDEWEB)

    McWilliam, C.; Curtis, S. [DOE, Las Vegas, NV (United States)

    1994-12-31

    The Department of Energy sponsored Non-Proliferation Experiment (formerly known as the Chemical Kiloton) involved the detonation of blasting agent approximately equivalent to one kiloton of energy release on the Nevada Test Site in an effort to determine if (and if so, which) discriminators exist between conventional and nuclear detonations of similar yield. Coordination among hundreds of scientists from at least fifteen different organizations were required to design the experiments necessary to collect and interpret data from this unique and complex event. Stakeholders and members of the Group of Scientific Experts of the Conference on Disarmament observed the progress of the experiment first hand. The experiment was a success in that a vast majority of the expected data was collected and shared quickly and efficiently throughout the international scientific community. The management of the project was discussed among the major co-sponsoring organizations and the significant {open_quotes}lessons learned{close_quotes} are presented.

  15. Lessons learned from a successful MEDRETE in El Salvador.

    Science.gov (United States)

    Post, James C; Melendez, Manuel E; Hershey, Donna N; Hakim, Abdul

    2003-04-01

    Medical readiness education and training exercises are short-term exercises designed to provide health care and preventive medicine education to underserved civilian populations overseas. These high profile missions provide superb training opportunities, build democracies, and can be a powerful incentive to retain soldiers in the Reserves. Despite this, the literature offers little guidance in terms of how to best conduct a MEDRETE, particularly with a unit that has not been recently deployed. A U.S. Army Reserve unit was deployed to El Salvador following two devastating earthquakes and treated 20,890 patients in 10 days. This patient volume was achieved by a close cooperative effort among an experienced Mission Coordinator and Reservists and superb host nation support. Lessons learned regarding predeployment, deployment, patient management, and safety issues are presented to assist future units in conducting successful medical readiness education and training exercises.

  16. Lessons Learned and Challenges in Building a Filipino Health Coalition

    Science.gov (United States)

    Aguilar, David E.; Abesamis-Mendoza, Noilyn; Ursua, Rhodora; Divino, Lily Ann M.; Cadag, Kara; Gavin, Nicholas P.

    2010-01-01

    In recent years, community-based coalitions have become an effective channel to addressing various health problems within specific ethnic communities. The purpose of this article is twofold: (a) to describe the process involved in building the Kalusugan Coalition (KC), a Filipino American health coalition based in New York City, and (b) to highlight the lessons learned and the challenges from this collaborative venture. The challenges described also offer insights on how the coalition development process can be greatly affected by the partnership with an academic institution on a community-based research project. Because each cultural group has unique issues and concerns, the theoretical framework used by KC offers creative alternatives to address some of the challenges regarding coalition infrastructures, leadership development, unexpected change of coalition dynamics, and cultural nuances. PMID:19098260

  17. Habitability and Human Factors: Lessons Learned in Long Duration Space Flight

    Science.gov (United States)

    Baggerman, Susan D.; Rando, Cynthia M.; Duvall, Laura E.

    2006-01-01

    This study documents the investigation of qualitative habitability and human factors feedback provided by scientists, engineers, and crewmembers on lessons learned from the ISS Program. A thorough review and understanding of this data is critical in charting NASA's future path in space exploration. NASA has been involved in ensuring that the needs of crewmembers to live and work safely and effectively in space have been met throughout the ISS Program. Human factors and habitability data has been collected from every U.S. crewmember that has resided on the ISS. The knowledge gained from both the developers and inhabitants of the ISS have provided a significant resource of information for NASA and will be used in future space exploration. The recurring issues have been tracked and documented; the top 5 most critical issues have been identified from this data. The top 5 identified problems were: excessive onsrbit stowage; environment; communication; procedures; and inadequate design of systems and equipment. Lessons learned from these issues will be used to aid in future improvements and developments to the space program. Full analysis of the habitability and human factors data has led to the following recommendations. It is critical for human factors to be involved early in the design of space vehicles and hardware. Human factors requirements need to be readdressed and redefined given the knowledge gained during previous ISS and long-duration space flight programs. These requirements must be integrated into vehicle and hardware technical documentation and consistently enforced. Lastly, space vehicles and hardware must be designed with primary focus on the user/operator to successfully complete missions and maintain a safe working environment. Implementation of these lessons learned will significantly improve NASA's likelihood of success in future space endeavors.

  18. Lessons Learned From Implementation of Westinghouse Owners Group Risk-Informed Inservice Inspection Methodology for Piping

    International Nuclear Information System (INIS)

    Stevenson, Paul R.; Haessler, Richard L.; McNeill, Alex; Pyne, Mark A.; West, Raymond A.

    2006-01-01

    Risk-informed inservice inspection (ISI) programs have been in use for over seven years as an alternative to current regulatory requirements in the development and implementation of ISI programs for nuclear plant piping systems. Programs using the Westinghouse Owners Group (WOG) (now known as the Pressurized Water Reactor Owners Group - PWROG) risk-informed ISI methodology have been developed and implemented within the U.S. and several other countries. Additionally, many plants have conducted or are in the process of conducting updates to their risk-informed ISI programs. In the development and implementation of these risk-informed ISI programs and the associated updates to those programs, the following important lessons learned have been identified and are addressed. Concepts such as 'loss of inventory', which are typically not modeled in a plant's probabilistic risk assessment (PRA) model for all systems. The importance of considering operator actions in the identification of consequences associated with a piping failure and the categorization of segments as high safety significant (HSS) or low safety significant (LSS). The impact that the above considerations have had on the large early release frequency (LERF) and categorization of segments as HSS or LSS. The importance of automation. Making the update process more efficient to reduce costs associated with maintaining the risk-informed ISI program. The insights gained are associated with many of the steps in the risk-informed ISI process including: development of the consequences associated with piping failures, categorization of segments, structural element selection and program updates. Many of these lessons learned have impacted the results of the risk-informed ISI programs and have impacted the updates to those programs. This paper summarizes the lessons learned and insights gained from the application of the WOG risk-informed ISI methodology in the U.S., Europe and Asia. (authors)

  19. Overview of Fukushima accident and the lessons learned from it

    International Nuclear Information System (INIS)

    Kawano, A.

    2012-01-01

    This paper is given in order to share the detailed information on the Fukushima Accident which occurred on March 11, 2011, and the lessons learned from it which worldwide nuclear experts might currently have more interest in. The paper first reflects how the facilities were damaged by a very strong earthquake and a series of beyond design-basis tsunamis. The earthquake caused loss of all off-site electric power at Fukushima Dacha Nuclear Power Station (1F), and the following series of tsunami made all emergency diesel generators except one for Unit 6 and most of DC batteries inoperable and severely damaged most of the facilities located on the ocean side. Thus all the units at 1a resulted in the loss of cooling function and ultimate heat sink for a long time period. TEPC focused on restoration of the instruments and lights in the Main Control Room (MCR), preparation of alternative water injection and venting of Primary Containment Vessel (PCV) in the recovery process. However, the workers faced a lot of difficulties such as total darkness, repeated aftershocks, high radiation dose, a lot of debris on the ground, loss of communication means, etc. Massive damages by the tsunami and lack of necessary equipment and resources hampered a quick recovery. It eventually resulted in the severe core damage of Unit 1, 2 and 3 and also the hydrogen explosions in the reactor buildings of Unit 1, 3 and 4. This paper finally extracts the lessons learned from the accident and proposed the countermeasures, such as flood protection for essential facilities, preparation of practical and effective tools, securing communication means and so on. These would help the people involved in the nuclear industries all over the world properly understand the accident and develop their own countermeasures appropriately

  20. Lessons learned from our accident at Fukushima nuclear power stations

    International Nuclear Information System (INIS)

    Kawano, A.

    2012-01-01

    This paper is given in order to share the detailed information on the Fukushima Accident which occurred on March 11, 2011, and the lessons learned from it which worldwide nuclear experts might currently have more interest in. The paper first reflects how the facilities were damaged by a very strong earthquake and a series of beyond design-basis tsunamis. The earthquake caused loss of all off-site electric power at Fukushima Daiichi Nuclear Power Station (1F), and the following series of tsunami made all emergency diesel generators except one for Unit 6 and most of DC batteries inoperable and severely damaged most of the facilities located on the ocean side. Thus all the units at 1F resulted in the loss of cooling function and ultimate heat sink for a long time period. TEPCO focused on restoration of the instruments and lights in the Main Control Room (MCR), preparation of alternative water injection and venting of Primary Containment Vessel (PCV) in the recovery process. However, the workers faced a lot of difficulties such as total darkness, repeated aftershocks, high radiation dose, a lot of debris on the ground, loss of communication means, etc. Massive damages by the tsunami and lack of necessary equipments and resources hampered a quick recovery. It eventually resulted in the severe core damage of Unit 1, 2, and 3 and also the hydrogen explosions in the reactor buildings of Unit 1, 3, and 4. This paper finally extracts the lessons learned from the accident and proposes the countermeasures, such as flood protection for essential facilities, preparation of practical and effective tools, securing communication means and so on. These would help the people involved in the nuclear industries all over the world properly understand the accident and develop their own countermeasures appropriately. (authors)

  1. Blended learning: strengths, challenges, and lessons learned in an interprofessional training program.

    Science.gov (United States)

    Lotrecchiano, G R; McDonald, P L; Lyons, L; Long, T; Zajicek-Farber, M

    2013-11-01

    This field report outlines the goals of providing a blended learning model for an interdisciplinary training program for healthcare professionals who care for children with disabilities. The curriculum blended traditional face-to-face or on-site learning with integrated online interactive instruction. Credit earning and audited graduate level online coursework, community engagement experiences, and on-site training with maternal and child health community engagement opportunities were blended into a cohesive program. The training approach emphasized adult learning principles in different environmental contexts integrating multiple components of the Leadership Education in Neurodevelopmental and Related Disabilities Program. This paper describes the key principles adopted for this blended approach and the accomplishments, challenges, and lessons learned. The discussion offers examples from training content, material gathered through yearly program evaluation, as well as university course evaluations. The lessons learned consider the process and the implications for the role of blended learning in this type of training program with suggestions for future development and adoption by other programs.

  2. Learning from aviation to improve safety in the operating room - a systematic literature review

    NARCIS (Netherlands)

    L.S.G.L. Wauben; J.F. Lange (Johan); R.H.M. Goossens (Richard)

    2012-01-01

    textabstractLessons learned from other high-risk industries could improve patient safety in the operating room (OR). This review describes similarities and differences between high-risk industries and describes current methods and solutions within a system approach to reduce errors in the OR. PubMed

  3. Lessons Learned from Ares I Upper Stage Structures and Thermal Design

    Science.gov (United States)

    Ahmed, Rafiq

    2012-01-01

    The Ares 1 Upper Stage was part of the vehicle intended to succeed the Space Shuttle as the United States manned spaceflight vehicle. Although the Upper Stage project was cancelled, there were many lessons learned that are applicable to future vehicle design. Lessons learned that are briefly detailed in this Technical Memorandum are for specific technical areas such as tank design, common bulkhead design, thrust oscillation, control of flight and slosh loads, purge and hazardous gas system. In addition, lessons learned from a systems engineering and vehicle integration perspective are also included, such as computer aided design and engineering, scheduling, and data management. The need for detailed systems engineering in the early stages of a project is emphasized throughout this report. The intent is that future projects will be able to apply these lessons learned to keep costs down, schedules brief, and deliver products that perform to the expectations of their customers.

  4. Lessons Learned in Preparation and Review of Safety Analysis Report of PUSPATI TRIGA Reactor in Malaysia

    International Nuclear Information System (INIS)

    Maskin, Mazleha; Choi, Kwang Sik

    2010-01-01

    PUSPATI TRIGA Reactor (RTP) is the one and only research reactor in Malaysia. Since the day it was supplied by General Atomic (GA) in 1983, periodic safety reviews were carried out but not published in the form of a complete SAR. In fact, the original SAR (SAR 1983) document was provided by GA as soon as GA was selected as the supplier of RTP. The focus of this report is on the lessons learned from the preparation of SAR. The lessons learned were to address the preparation and regulatory review of the second SAR (SAR 2006). Realizing that safety is important as RTP is aging, the experiences and lessons learned from SAR development and updating processes are of great value for all parties involved. The purpose of this report is to consolidate and organize the lessons learned and suggest the best practice for the next SAR development both in preparation and regulatory review

  5. Lessons Learned in Preparation and Review of Safety Analysis Report of PUSPATI TRIGA Reactor in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Maskin, Mazleha [Korea Advanced Institute for Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    PUSPATI TRIGA Reactor (RTP) is the one and only research reactor in Malaysia. Since the day it was supplied by General Atomic (GA) in 1983, periodic safety reviews were carried out but not published in the form of a complete SAR. In fact, the original SAR (SAR 1983) document was provided by GA as soon as GA was selected as the supplier of RTP. The focus of this report is on the lessons learned from the preparation of SAR. The lessons learned were to address the preparation and regulatory review of the second SAR (SAR 2006). Realizing that safety is important as RTP is aging, the experiences and lessons learned from SAR development and updating processes are of great value for all parties involved. The purpose of this report is to consolidate and organize the lessons learned and suggest the best practice for the next SAR development both in preparation and regulatory review

  6. Deploying Serious Games for Management in Higher Education: lessons learned and good practices

    NARCIS (Netherlands)

    Baalsrud Hauge, Jannicke; Bellotti, Francesco; Nadolski, Rob; Kickmeier-Rust, Michael; Berta, Riccardo; Carvalho, Maria B.

    2013-01-01

    Baalsrud Hauge, J., Bellotti, F., Nadolski, R. J., Kickmeier-Rust, M., Berta, R., & Carvalho, M. B. (2013, 4 October). Deploying Serious Games for Management in Higher Education: lessons learned and good practices. Presentation at ECGBL 2013, Porto, Portugal.

  7. Best Practices and Lessons Learned In LANL Approaches to Transportation Security

    Energy Technology Data Exchange (ETDEWEB)

    Drypolcher, Katherine Carr [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-24

    Presentation includes slides on Physical Protection of Material in Transit; Graded Approach for Implementation Controls; Security Requirements; LANL Lessons Learned; Shipping Violation; Unmonitored Shipment; Foreign shipment; and the Conclusion.

  8. IVHS Institutional Issues and Case Studies, Analysis and Lessons Learned, Final Report

    Science.gov (United States)

    1994-04-01

    This 'Analysis and Lessons Learned' report contains observations, conclusions, and recommendations based on the performance of six case studies of Intelligent Vehicle-Highway Systems (IVHS) projects. Information to support the development of the case...

  9. Systemwide Deployment of Medical Team Training: Lessons Learned in the Department of Defense

    National Research Council Canada - National Science Library

    King, Heidi B; Kohsin, Beth; Salisbury, Mary

    2005-01-01

    .... Lessons learned within the U.S. Department of Defense indicate that for teamwork initiatives to be effective, they must possess a clear blueprint defining the solid steps for building the desired culture...

  10. Preparing for the Worst: Psychological Excellence of First Responders - A Katrina Lessons Learned Study

    National Research Council Canada - National Science Library

    Seong, Younho; Springs, Sherry; Chung, Yongchul; Avery-Epps, Regina

    2008-01-01

    ... formidable disaster. In fact, there have been several official lessons learned reports and the findings and recommendations from these reports of the response to Hurricane Katrina have been addressed...

  11. Evolutionary Acquisition of the Global Command and Control System: Lessons Learned

    National Research Council Canada - National Science Library

    Wallis, Johnathan

    1998-01-01

    This paper summarizes a "lessons learned" study that reviews DoD's approach to managing the GCCS program on behalf on the Assistant Secretary of Defense for Command, Control, Communications, and Intelligence (ASD/C3I...

  12. Study on modeling of operator's learning mechanism

    International Nuclear Information System (INIS)

    Yoshimura, Seichi; Hasegawa, Naoko

    1998-01-01

    One effective method to analyze the causes of human errors is to model the behavior of human and to simulate it. The Central Research Institute of Electric Power Industry (CRIEPI) has developed an operator team behavior simulation system called SYBORG (Simulation System for the Behavior of an Operating Group) to analyze the human errors and to establish the countermeasures for them. As an operator behavior model which composes SYBORG has no learning mechanism and the knowledge of a plant is fixed, it cannot take suitable actions when unknown situations occur nor learn anything from the experience. However, considering actual operators, learning is an essential human factor to enhance their abilities to diagnose plant anomalies. In this paper, Q learning with 1/f fluctuation was proposed as a learning mechanism of an operator and simulation using the mechanism was conducted. The results showed the effectiveness of the learning mechanism. (author)

  13. SRS SLUDGE BATCH QUALIFICATION AND PROCESSING; HISTORICAL PERSPECTIVE AND LESSONS LEARNED

    Energy Technology Data Exchange (ETDEWEB)

    Cercy, M.; Peeler, D.; Stone, M.

    2013-09-25

    This report provides a historical overview and lessons learned associated with the SRS sludge batch (SB) qualification and processing programs. The report covers the framework of the requirements for waste form acceptance, the DWPF Glass Product Control Program (GPCP), waste feed acceptance, examples of how the program complies with the specifications, an overview of the Startup Program, and a summary of continuous improvements and lessons learned. The report includes a bibliography of previous reports and briefings on the topic.

  14. TMI-2: Lessons learned by the US Department of Energy: A programmatic perspective

    International Nuclear Information System (INIS)

    Schmitt, R.C.; Reno, H.W.; Bentley, K.J.; Owens, D.E.

    1990-03-01

    This report is a summary of the lessons learned by the US Department of Energy during its decade-long participation in the research and accident cleanup project at Three Mile Island Nuclear Power Station Unit 2 near Harrisburg, Pennsylvania. It is based on a review of a wide range of project documents and interviews with personnel from the many organizations involved. The lessons are organized into major subjects with a brief background section to orient the reader to that subject. The subjects are divided into sub-topics, each with a brief discussion and a series of lessons learned. The lessons are very brief and each is preceded with a keyword phrase to highlight its specific topic. References are given so that the details of the subject and the lesson can be further investigated. 99 refs., 24 figs

  15. Lesson Learned in Preparation for Decommissioning of Three Canadian Prototype Power Reactors

    International Nuclear Information System (INIS)

    Vickerd, Meggan; Kenny, Stephen

    2016-01-01

    Lesson learned by Canadian Nuclear Laboratories (CNL)(former AECL) in preparation for decommissioning of three Prototype Reactors is a result of various strategies used for each site. CNL is responsible for the eventual decommissioning of three prototype power reactors; Nuclear Power Demonstration (NPD), Gentilly-1 and Douglas Point. Each of the Canadian prototype power reactor sites shutdown using different strategies. Depending on the site location, configuration, and intended designation of the respective sites, the individual facility systems (ventilation, electrical system, fire detection etc.) were also shut down using different strategies and operating objectives. As CNL embarks on decommissioning the first Canadian prototype reactor, this paper will reflect on the lessons learned over the past thirty years and what CNL is adjusting in the decommissioning strategy to prepare better plans for the future. The Nuclear Power Demonstration Nuclear Generating Station (NPDNGS) was constructed in late 1950's and operated from 1962 to 1987 when it was permanently shutdown after exceeding its operational goals. The NPD reactor was the first Canadian nuclear power reactor and it consisted of a single 20 MWe pressurized heavy water reactor located on a single facility site in Rolphton, Ontario. The NPD facility was shutdown to a 'Cold, Dark and Quiet' state and is maintained using an unmanned strategy by managing the site remotely with active fire detection and security surveillance systems, minimal electrical supply and an active ventilation system which is operated periodically to allow for intermittent inspections. The Douglas Point Nuclear Generating Station (DPNGS) was constructed in the early 1960's and operated from 1968 to 1984 when it was permanently shutdown. It consisted of a 200 MW prototype Canada Deuterium Uranium (CANDU) reactor and is embedded on the Bruce Power site near Kincardine, Ontario. The Douglas Point site is maintained in a

  16. Service Oriented Robotic Architecture for Space Robotics: Design, Testing, and Lessons Learned

    Science.gov (United States)

    Fluckiger, Lorenzo Jean Marc E; Utz, Hans Heinrich

    2013-01-01

    This paper presents the lessons learned from six years of experiments with planetary rover prototypes running the Service Oriented Robotic Architecture (SORA) developed by the Intelligent Robotics Group (IRG) at the NASA Ames Research Center. SORA relies on proven software engineering methods and technologies applied to space robotics. Based on a Service Oriented Architecture and robust middleware, SORA encompasses on-board robot control and a full suite of software tools necessary for remotely operated exploration missions. SORA has been eld tested in numerous scenarios of robotic lunar and planetary exploration. The experiments conducted by IRG with SORA exercise a large set of the constraints encountered in space applications: remote robotic assets, ight relevant science instruments, distributed operations, high network latencies and unreliable or intermittent communication links. In this paper, we present the results of these eld tests in regard to the developed architecture, and discuss its bene ts and limitations.

  17. Reliability Lessons Learned From GPU Experience With The Titan Supercomputer at Oak Ridge Leadership Computing Facility

    Energy Technology Data Exchange (ETDEWEB)

    Gallarno, George [Christian Brothers University; Rogers, James H [ORNL; Maxwell, Don E [ORNL

    2015-01-01

    The high computational capability of graphics processing units (GPUs) is enabling and driving the scientific discovery process at large-scale. The world s second fastest supercomputer for open science, Titan, has more than 18,000 GPUs that computational scientists use to perform scientific simu- lations and data analysis. Understanding of GPU reliability characteristics, however, is still in its nascent stage since GPUs have only recently been deployed at large-scale. This paper presents a detailed study of GPU errors and their impact on system operations and applications, describing experiences with the 18,688 GPUs on the Titan supercom- puter as well as lessons learned in the process of efficient operation of GPUs at scale. These experiences are helpful to HPC sites which already have large-scale GPU clusters or plan to deploy GPUs in the future.

  18. From the Games Industry: Ten Lessons for Game-Based Learning

    Science.gov (United States)

    Hollins, Paul; Whitton, Nicola

    2011-01-01

    This paper draws on lessons learned from the development process of the entertainment games industry and discusses how they can be applied to the field of game-based learning. This paper examines policy makers and those wishing to commission or develop games for learning and highlights potential opportunities as well as pitfalls. The paper focuses…

  19. Building Accessible Educational Web Sites: The Law, Standards, Guidelines, Tools, and Lessons Learned

    Science.gov (United States)

    Liu, Ye; Palmer, Bart; Recker, Mimi

    2004-01-01

    Professional education is increasingly facing accessibility challenges with the emergence of webbased learning. This paper summarizes related U.S. legislation, standards, guidelines, and validation tools to make web-based learning accessible for all potential learners. We also present lessons learned during the implementation of web accessibility…

  20. Lessons-learned from ongoing decommissioning project of Fugen NPS

    International Nuclear Information System (INIS)

    Tezuka, M.; Koda, Y.; Iguchi, Y.; Kato, Y.; Yanagihara, S.

    2017-01-01

    .g., narrow calf width leading to the reduction of secondary waste and remote-handle ability by using fiber laser. But this method has not yet been applied to reactor facilities throughout the world. Therefore for the safe and reliable dismantlement, laser cutting system in air will be organized and demonstration examinations to some equipment except core area will be carried out. Moreover, laser cutting system underwater should be also organized, taking a safety assessment data such as behavior of cutting dust. In the final stage, after inspection of dismantling procedure using mock-up device, after the core area is planning to be dismantled. This indicates an example of lessons-learned for the process of how the decommissioning program is planned and R and D for suitable technologies are implemented and they are applied to the final dismantlement process. (authors)

  1. MAVEN Information Security Governance, Risk Management, and Compliance (GRC): Lessons Learned

    Science.gov (United States)

    Takamura, Eduardo; Gomez-Rosa, Carlos A.; Mangum, Kevin; Wasiak, Fran

    2014-01-01

    As the first interplanetary mission managed by the NASA Goddard Space Flight Center, the Mars Atmosphere and Volatile EvolutioN (MAVEN) had three IT security goals for its ground system: COMPLIANCE, (IT) RISK REDUCTION, and COST REDUCTION. In a multiorganizational environment in which government, industry and academia work together in support of the ground system and mission operations, information security governance, risk management, and compliance (GRC) becomes a challenge as each component of the ground system has and follows its own set of IT security requirements. These requirements are not necessarily the same or even similar to each other's, making the auditing of the ground system security a challenging feat. A combination of standards-based information security management based on the National Institute of Standards and Technology (NIST) Risk Management Framework (RMF), due diligence by the Mission's leadership, and effective collaboration among all elements of the ground system enabled MAVEN to successfully meet NASA's requirements for IT security, and therefore meet Federal Information Security Management Act (FISMA) mandate on the Agency. Throughout the implementation of GRC on MAVEN during the early stages of the mission development, the Project faced many challenges some of which have been identified in this paper. The purpose of this paper is to document these challenges, and provide a brief analysis of the lessons MAVEN learned. The historical information documented herein, derived from an internal pre-launch lessons learned analysis, can be used by current and future missions and organizations implementing and auditing GRC.

  2. Lessons learned from a landslide catastrophe in Rio de Janeiro, Brazil.

    Science.gov (United States)

    Pereira, Bruno Monteiro Tavares; Morales, Wellington; Cardoso, Ricardo Galesso; Fiorelli, Rossano; Fraga, Gustavo Pereira; Briggs, Susan M

    2013-01-01

    On January, 2011, a devastating tropical storm hit the mountain area of Rio de Janeiro State in Brazil, resulting in flooding and mudslides and leaving 30,000 individuals displaced. This article explores key lessons learned from this major mass casualty event, highlighting prehospital and hospital organization for receiving multiple victims in a short period of time, which may be applicable in similar future events worldwide. A retrospective review of local hospital medical/fire department records and data from the Health and Security Department of the State were analyzed. Medical examiner archives were analyzed to determine the causes of death. The most common injuries were to the extremities, the majority requiring only wound cleaning, debridement, and suture. Orthopedic surgeries were the most common operative procedures. In the first 3 days, 191 victims underwent triage at the hospital with 50 requiring admission to the hospital. Two hundred fifty patients were triaged at the hospital by the end of the fifth day. The mortis cause for the majority of deaths was asphyxia, either by drowning or mud burial. Natural disasters are able to generate a large number of victims and overwhelm the main channels of relief available. Main lessons learned are as follows: 1) prevention and training are key points, 2) key measures by the authorities should be taken as early as possible, and 3) the centralization of the deceased in one location demonstrated greater effectiveness identifying victims and releasing the bodies back to families.

  3. Lessons learned from the development of health applications in a tertiary hospital.

    Science.gov (United States)

    Park, Joong-Yeol; Lee, Guna; Shin, Soo-Yong; Kim, Jeong Hun; Han, Hye-Won; Kwon, Tae-Wan; Kim, Woo Sung; Lee, Jae Ho

    2014-03-01

    Adoption of smart devices for hospital use has been increasing with the development of health applications (apps) for patient point-of-care and hospital management. To promote the use of health apps, we describe the lessons learned from developing 12 health apps in the largest tertiary hospital in Korea. We reviewed and analyzed 12 routinely used apps in three categories-Smart Clinic, Smart Patient, and Smart Hospital-based on target users and functions. The log data for each app were collected from the date of release up until December 2012. Medical personnel accessed a mobile electronic medical record app classified as Smart Clinic an average of 452 times per day. Smart Hospital apps are actively used to communicate with each other. Patients logged on to a mobile personal health record app categorized as Smart Patient an average of 222 times per day. As the mobile trend, the choice of supporting operating system (OS) is more difficult. By developing these apps, a monitoring system is needed for evaluation. We described the lessons learned regarding OS support, device choice, and developmental strategy. The OS can be chosen according to market share or hospital strategic plan. Smartphones were favored compared with tablets. Alliance with an information technology company can be the best way to develop apps. Health apps designed for smart devices can be used to improve healthcare. However, to develop health apps, hospitals must define their future goals and carefully consider all the aspects.

  4. Experiences and lessons learned for planning and supply of micronutrient powders interventions

    Science.gov (United States)

    Schauer, Claudia; Sunley, Nigel; Nyhus Dhillon, Christina; Roca, Claudia; Tapia, Gustavo; Mathema, Pragya; Walton, Shelley; Situma, Ruth; Zlotkin, Stanley; DW Klemm, Rolf

    2017-01-01

    Abstract Realistic planning for a nutrition intervention is a critical component of implementation, yet effective approaches have been poorly documented. Under the auspices of “The Micronutrient Powders Consultation: Lessons Learned for Operational Guidance,” 3 working groups were formed to summarize experiences and lessons across countries regarding micronutrient powders (MNP) interventions for young children. This paper focuses on programmatic experiences in the planning stages of an MNP intervention, encompassing assessment, enabling environment and adaptation, as well as considerations for supply. Methods included a review of published and grey literature, key informant interviews, and deliberations throughout the consultation process. We found that assessments helped justify adopting an MNP intervention, but these assessments were often limited by their narrow scope and inadequate data. Establishing coordinating bodies and integrating MNP into existing policies and programmes have helped foster an enabling environment and support programme stability. Formative research and pilots have been used to adapt MNP interventions to specific contexts, but they have been insufficient to inform scale‐up. In terms of supply, most countries have opted to procure MNP through international suppliers, but this still requires understanding and navigating the local regulatory environment at the earliest stages of an intervention. Overall, these findings indicate that although some key planning and supply activities are generally undertaken, improvements are needed to plan for effective scale‐up. Much still needs to be learned on MNP planning, and we propose a set of research questions that require further investigation. PMID:28960875

  5. Lessons Learned From Dynamic Simulations of Advanced Fuel Cycles

    International Nuclear Information System (INIS)

    Piet, Steven J.; Dixon, Brent W.; Jacobson, Jacob J.; Matthern, Gretchen E.; Shropshire, David E.

    2009-01-01

    Years of performing dynamic simulations of advanced nuclear fuel cycle options provide insights into how they could work and how one might transition from the current once-through fuel cycle. This paper summarizes those insights from the context of the 2005 objectives and goals of the Advanced Fuel Cycle Initiative (AFCI). Our intent is not to compare options, assess options versus those objectives and goals, nor recommend changes to those objectives and goals. Rather, we organize what we have learned from dynamic simulations in the context of the AFCI objectives for waste management, proliferation resistance, uranium utilization, and economics. Thus, we do not merely describe 'lessons learned' from dynamic simulations but attempt to answer the 'so what' question by using this context. The analyses have been performed using the Verifiable Fuel Cycle Simulation of Nuclear Fuel Cycle Dynamics (VISION). We observe that the 2005 objectives and goals do not address many of the inherently dynamic discriminators among advanced fuel cycle options and transitions thereof

  6. Tunneling on the Yucca Mountain Project: Progress and lessons learned

    International Nuclear Information System (INIS)

    Hansmire, W.H.; Rogers, D.J.; Wightman, W.D.

    1996-01-01

    The Yucca Mountain Site Characterization Project is the US's effort to confirm the technical acceptability of Yucca Mountain as a repository for high-level nuclear waste. A key part of the site characterization project is the construction of a 7.8-km-long, 7.6-m-diameter tunnel for in-depth geologic and other scientific investigations. The work is governed in varying degrees by the special requirements for nuclear quality assurance, which imposes uncommon and often stringent limitations on the materials which can be used in construction, the tunneling methods and procedures used, and record-keeping for many activities. This paper presents the current status of what has been learned, how construction has adapted to meet the requirements, and how the requirements were interpreted in a mitigating way to meet the legal obligations, yet build the tunnel as rapidly as possible. With regard to design methodologies and the realities of tunnel construction, ground support with a shielded Tunnel Boring Machine is discussed. Notable lessons learned include the need for broad design analyses for a wide variety of conditions and how construction procedures affect ground support

  7. The layered learning practice model: Lessons learned from implementation.

    Science.gov (United States)

    Pinelli, Nicole R; Eckel, Stephen F; Vu, Maihan B; Weinberger, Morris; Roth, Mary T

    2016-12-15

    Pharmacists' views about the implementation, benefits, and attributes of a layered learning practice model (LLPM) were examined. Eligible and willing attending pharmacists at the same institution that had implemented an LLPM completed an individual, 90-minute, face-to-face interview using a structured interview guide developed by the interdisciplinary study team. Interviews were digitally recorded and transcribed verbatim without personal identifiers. Three researchers independently reviewed preliminary findings to reach consensus on emerging themes. In cases where thematic coding diverged, the researchers discussed their analyses until consensus was reached. Of 25 eligible attending pharmacists, 24 (96%) agreed to participate. The sample was drawn from both acute and ambulatory care practice settings and all clinical specialty areas. Attending pharmacists described several experiences implementing the LLPM and perceived benefits of the model. Attending pharmacists identified seven key attributes for hospital and health-system pharmacy departments that are needed to design and implement effective LLPMs: shared leadership, a systematic approach, good communication, flexibility for attending pharmacists, adequate resources, commitment, and evaluation. Participants also highlighted several potential challenges and obstacles for organizations to consider before implementing an LLPM. According to attending pharmacists involved in an LLPM, successful implementation of an LLPM required shared leadership, a systematic approach, communication, flexibility, resources, commitment, and a process for evaluation. Copyright © 2016 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  8. Polio Crisis in Costa Rica: Lessons Learned and Achievements

    Directory of Open Access Journals (Sweden)

    Gioconda Vargas-Morúa

    2015-05-01

    Full Text Available This presentation shows some of the consequences of the polio crisis in Costa Rica during the 1950’s, in order to preserve certain attitudes of Costa Ricans back then that are worth remembering: simplicity, solidarity and gratefulness. Hand in hand with highly service-oriented men and women, the country overcame the crisis and built one of the most iconic hospitals in Costa Rica: the National Children’s Hospital. It is worth rescuing the lessons learned and applying them to current times. This historical text was created based on the stories told by people who lived during the times of the crisis, on a 1956 notebook, on documents from the National Archive and the National Health and Social Security Library (BINASSS, for its name in Spanish, the Costa Rican Social Security System (CCSS, for its name in Spanish, Dr. Rodolfo Álvaro Murillo, and San Juan de Dios Hospital.  National and international newspapers were also reviewed. The consulted material confirms how the work of Costa Ricans, led by committed and service-oriented individuals, allowed for the construction of the National Children’s Hospital to take place -an institution that has served the Costa Rican people for fifty years. Costa Ricans also succeeded in eradicating polio long before several other countries around the world. The reactions of people in the 1950’s are lessons of solidarity and humanity that should not be forgotten; they should be remembered in order to value team work over individual work and make sure, no matter what our role in society is, to always stand by common well-being, as mid-century Costa Ricans did by overcoming their personal limitations and acting for the benefit of society.

  9. Experimental follow-up of the Bois-Joly GAEC methanization installation - Global assessment, final report, Phase 2 - Unit follow-up protocol. Operation assessment of the Bois-Joly GAEC agricultural discontinuous dry methanization unit. The discontinuous dry process: lessons learned after 6 years of exploitation at the Bois-Joly GAEC

    International Nuclear Information System (INIS)

    Brosset, Denis; Pouech, Philippe; Guillet, Marie; Banville, Sandrine; Bastide, Guillaume; Thual, J.

    2008-06-01

    A first document reports the follow-up study of an existing methanization installation. This study comprises four phases. The first one is a general presentation of the installation. The second one addresses the determination of reference indicators and the definition of the follow-up protocol. The third one is an installation follow-up over two years. The report thus proposes a presentation of the exploitation principles and operation, technical data regarding the methanization installation, the definition of follow-up parameters, protocol and means. It reports the elaboration of technical, environmental and economic indicators, and proposes an analysis of the installation performance, assets and weaknesses while outlining interests and perspectives of a formatted follow-up of methanization installations. Appendices notably contain the phase 2 report related to the unit follow-up protocol, results of physical-chemical composition analyses and of performance tests, a synthetic report of the experimental follow-up. A Power Point presentation reports the operation assessment. Another one proposes a discussion of lessons learned after 6 years of operation of the studied installation and more particularly about its discontinuous dry process. Another Power Point comments the relationship between research and application in the case of this specific process. Two documents and leaflets present the installation and a synthetic report of its experimental follow-up

  10. Bringing authentic service learning to the classroom: benefits and lessons learned

    Science.gov (United States)

    Chamberlain, Leslie C.

    2016-06-01

    Project-based learning, which has gained significant attention within K-12 education, provides rich hands-on experiences for students. Bringing an element of service to the projects allow students to engage in a local or global community, providing an abundance of benefits to the students’ learning. For example, service projects build confidence, increase motivation, and exercise problem-solving and communication skills in addition to developing a deep understanding of content. I will present lessons I have learned through four years of providing service learning opportunities in my classroom. I share ideas for astronomy projects, tips for connecting and listening to a community, and helpful guidelines to hold students accountable in order to ensure a productive and educational project.

  11. Lessons Learned (3 Years of H2O2 Propulsion System Testing Efforts at NASA's John C. Stennis Space Center)

    Science.gov (United States)

    Taylor, Gary O.

    2001-01-01

    John C. Stennis Space Center continues to support the Propulsion community in an effort to validate High-Test Peroxide as an alternative to existing/future oxidizers. This continued volume of peroxide test/handling activity at Stennis Space Center (SSC) provides numerous opportunities for the SSC team to build upon previously documented 'lessons learned'. SSC shall continue to strive to document their experience and findings as H2O2 issues surface. This paper is intended to capture all significant peroxide issues that we have learned over the last three years. This data (lessons learned) has been formulated from practical handling, usage, storage, operations, and initial development/design of our systems/facility viewpoint. The paper is intended to be an information type tool and limited in technical rational; therefore, presenting the peroxide community with some issues to think about as the continued interest in peroxide evolves and more facilities/hardware are built. These lessons learned are intended to assist industry in mitigating problems and identifying potential pitfalls when dealing with the requirements for handling high-test peroxide.

  12. Preliminary Lessons about Supporting Participation and Learning in Inclusive Classrooms

    Science.gov (United States)

    Morningstar, Mary E.; Shogren, Karrie A.; Lee, Hyunjoo; Born, Kiara

    2015-01-01

    This descriptive study examined observational data collected in inclusive classrooms from six schools that were operating schoolwide inclusive policies and practices. Illustrative evidence of classroom practices supporting learning and participation of all students, including students with significant disabilities, adds to an understanding of…

  13. Lessons of L'Aquila for Operational Earthquake Forecasting

    Science.gov (United States)

    Jordan, T. H.

    2012-12-01

    The L'Aquila earthquake of 6 Apr 2009 (magnitude 6.3) killed 309 people and left tens of thousands homeless. The mainshock was preceded by a vigorous seismic sequence that prompted informal earthquake predictions and evacuations. In an attempt to calm the population, the Italian Department of Civil Protection (DPC) convened its Commission on the Forecasting and Prevention of Major Risk (MRC) in L'Aquila on 31 March 2009 and issued statements about the hazard that were widely received as an "anti-alarm"; i.e., a deterministic prediction that there would not be a major earthquake. On October 23, 2012, a court in L'Aquila convicted the vice-director of DPC and six scientists and engineers who attended the MRC meeting on charges of criminal manslaughter, and it sentenced each to six years in prison. A few weeks after the L'Aquila disaster, the Italian government convened an International Commission on Earthquake Forecasting for Civil Protection (ICEF) with the mandate to assess the status of short-term forecasting methods and to recommend how they should be used in civil protection. The ICEF, which I chaired, issued its findings and recommendations on 2 Oct 2009 and published its final report, "Operational Earthquake Forecasting: Status of Knowledge and Guidelines for Implementation," in Aug 2011 (www.annalsofgeophysics.eu/index.php/annals/article/view/5350). As defined by the Commission, operational earthquake forecasting (OEF) involves two key activities: the continual updating of authoritative information about the future occurrence of potentially damaging earthquakes, and the officially sanctioned dissemination of this information to enhance earthquake preparedness in threatened communities. Among the main lessons of L'Aquila is the need to separate the role of science advisors, whose job is to provide objective information about natural hazards, from that of civil decision-makers who must weigh the benefits of protective actions against the costs of false alarms

  14. Learning lessons from natural disasters - sectorial or holistic perspectives?

    Science.gov (United States)

    Johansson, M.; Blumenthal, B.; Nyberg, L.

    2009-04-01

    Lessons learning from systematic analyses of past natural disasters is of great importance for future risk reduction and vulnerability management. It is one crucial piece of a puzzle towards disaster resilient societies, together with e.g. models of future emerging climate-related risks, globalization or demographic changes. Systematic analyses of impact and management of past events have commonly been produced in many sectors, but the knowledge is seldom shared outside the own organization or produced for other actors. To increase the availability of reports and documents, the Swedish Rescue Services Agency has created the Swedish Natural Hazards Information System, in accordance with a government commission from 2005. The system gathers accident reports, investigations and in-depth analyses, together with societal additional costs and mappings of consequences from central and local governments, NGO's and private actors. Evaluation of the collection reveals large differences in quality, systematic approach, depth and extent, clearly consistent with the lack of coherent harmonization of investigation and reporting approaches. Type of hazard, degree of impact and time elapsed since present are decisive for the collected volume. LPHC (low probability high consequences) disasters usually comprise most data and analytical activities, since they often are met with surprise and highlight the failure to integrate resilience into normal societal planning. During the last 50 years, several LPHC events in Sweden have functioned as alarm clocks and entailed major changes and improvements in government policies or legislations, safety management systems, risk assessments, response training, stakeholder communication, etc. Such an event occurred in January 2005 when Northern Europe was confronted with one of the most severe storms in modern history. Accidents that caused 24 fatalities occurred (17 in Sweden), several regions in UK and Germany were flooded and extensive areas of

  15. Learning about the Numerator and Denominator in Teacher-Designed Lessons

    Science.gov (United States)

    Kullberg, Angelika; Runesson, Ulla

    2013-01-01

    This study concerns pupils' experience of unit and non-unit fractions of a discrete quantity during specially designed lessons. The aim was to explore pupils' understanding of operations such as "b/c of a" in lessons where the teachers were aware of some pupils' difficulties beforehand and what needed special attention.…

  16. A Lesson about the Circular Flow. Active Learning Lessons. Economics International.

    Science.gov (United States)

    Landfried, Janet

    This lesson plan was developed through "Economics International," an international program to help build economic education infrastructures in the emerging market economies. It provides a lesson description; appropriate grade level; economic concepts; content standards and benchmarks; related subjects; instructional objectives; time…

  17. Lessons Learned from the Jefferson Lab - SNS Cryomodule Production Run

    International Nuclear Information System (INIS)

    John Hogan; Edward Daly; John Fischer; Joseph Preble

    2005-01-01

    In light of the recent developments with the International Linear Collider (ILC), and the recommendation to utilize ''Cold'' technology for this future particle accelerator, this paper will present the lessons learned from the recently concluded Spallation Neutron Source (SNS) superconducting radio frequency (SRF) cryomodule production run at the Thomas Jefferson National Accelerator Facility (Jefferson Lab). Over the past twenty years Jefferson Lab has worked with industry to successfully design, manufacture, test and commission more SRF cryomodules than any other entity in the United States. The knowledge gained from the design and fabrication of the SNS prototype, eleven - 0.61 (medium) beta and the twelve - 0.81 (high) beta cryomodules, will prove to be an effective asset to the ILC project. After delivery of the final production cryomodule in March 2005, design and fabrication data will be collected, evaluated and presented to make this information beneficial for future particle accelerator projects. Recommendations with respect to these findings will also be presented as an integral part of this paper

  18. Lessons learned on the Ground Test Accelerator control system

    International Nuclear Information System (INIS)

    Kozubal, A.J.; Weiss, R.E.

    1994-01-01

    When we initiated the control system design for the Ground Test Accelerator (GTA), we envisioned a system that would be flexible enough to handle the changing requirements of an experimental project. This control system would use a developers' toolkit to reduce the cost and time to develop applications for GTA, and through the use of open standards, the system would accommodate unforeseen requirements as they arose. Furthermore, we would attempt to demonstrate on GTA a level of automation far beyond that achieved by existing accelerator control systems. How well did we achieve these goals? What were the stumbling blocks to deploying the control system, and what assumptions did we make about requirements that turned out to be incorrect? In this paper we look at the process of developing a control system that evolved into what is now the ''Experimental Physics and Industrial Control System'' (EPICS). Also, we assess the impact of this system on the GTA project, as well as the impact of GTA on EPICS. The lessons learned on GTA will be valuable for future projects

  19. Transboundary Movement of Radioactively Contaminated Scrap Metal - Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Nizamska, M., E-mail: m.nimzamska@bnra.bg [Emergency Planning and Preparedness Division, Bulgarian Nuclear Regulatory Agency, Sofia (Bulgaria)

    2011-07-15

    Starting in 1989, Bulgaria has undergone a comprehensive transformation of its economy and social conditions. Part of this process is related to the intensive privatization that started in 2001. This privatization included facilities, as well as sites that use radioactive material for different applications - industry, medicine, agriculture, science, etc. The rapid change of property ownership and, in some cases, the resulting bankruptcy, has caused difficulties in tracing and identifying radioactive sources and materials and a deterioration of the system of safety, physical protection, etc. of radioactive material. In some cases, radioactive sources were stolen because of the value of their protective containers and sold for scrap metal. This led to the occurrence of different types of radiation incidents, mainly related to the discovery of radioactive sources in scrap metal. The consequences of these incidents include the risk of radiation exposure of the workers at scrap metal yards or reprocessing facilities and of members of the public and, in addition, radioactive contamination of the environment. The Bulgarian Nuclear Regulatory Agency (BNRA) has been responding to these incidents and has carried out a series of measures to improve the control over materials (e.g. activated or surface contaminated materials) and radioactive sources and to strengthen the preventive, monitoring, emergency preparedness and mitigating measures at facility, national and transboundary levels. This paper presents an analysis of the lessons learned by the BNRA and of the control of the transboundary movement of radioactively contaminated scrap metal through the territory of Bulgaria. (author)

  20. Management of cervical spine injuries in young children: lessons learned.

    Science.gov (United States)

    Smith, Jodi L; Ackerman, Laurie L

    2009-07-01

    Previous studies have shown that the correct use of car safety seats can protect infants and children from vehicular injury. Although child passenger devices are increasingly used in the US, motor vehicle crashes continue to be the leading cause of death and acquired disability in infants and children younger than 14 years of age. These events are likely related, at least in part, to the high percentage of children who are unrestrained or improperly restrained. The authors present 2 cases of severe cervical spine trauma in young children restrained in car safety seats during a motor vehicle crash: 1) a previously healthy 14-month-old girl who was improperly restrained in a forward-facing booster seat secured to the vehicle by a lap belt, and 2) a previously healthy 30-month-old girl who was a rear seat passenger restrained in a car safety seat. This study points out the unique challenges encountered in treating cervical spine injuries in infants and young children, as well as the lessons learned, and emphasizes the significance of continuing efforts to increase family and public awareness regarding the importance of appropriate child safety seat selection and use.