  1. A summary of lessons learned at the Shippingport Station Decommissioning Project (SSDP)

    International Nuclear Information System (INIS)

    Crimi, F.P.; Mullee, G.R.

    1987-10-01

    This paper describes the lessons learned from a management perspective during decommissioning. The lessons learned are presented in a chronological sequence during the life of the project up to the present time. The careful analysis of the lessons learned and the implementation of corresponding actions have contributed toward improving the effectiveness of decommissioning as time progresses. The lessons learned should be helpful in planning future decommissioning projects

  2. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  3. Lesson Planning the Kodaly Way.

    Science.gov (United States)

    Boshkoff, Ruth

    1991-01-01

    Discusses the contribution of Zoltan Kodaly to music lesson planning. Emphasizes preparation, presentation, and practice as the three important strategies in teaching concepts and skills to be included in a lesson plan. Includes a sample lesson plan covering a semester and advice on choosing song material. (DK)

  4. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    Lesson PlanningTask 1As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need tobe included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasonswhy we need to plan our lessons.

  5. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ Lesson Planning Task 1 As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need to be included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasons why we need to plan our lessons.

  6. With Interest It Comes To...Unconscionable Clauses in Sales Contracts. A Student's Lesson Plan [and] A Teacher's Lesson Plan [and] A Lawyer's Lesson Plan.

    Science.gov (United States)

    Howard, Estelle; And Others

    One of a series of secondary level teaching units presenting case studies with pro and con analysis of particular legal problems, the document presents a student's lesson plan, a teacher's lesson plan, and a lawyer's lesson plan on unconscionable clauses in sales contracts. The unit acquaints students with the operation of sales contracts and…

  7. Summary of Planned Implementation for the HTGR Lessons Learned Applicable to the NGNP

    International Nuclear Information System (INIS)

    Mckirdy, Ian

    2011-01-01

    This document presents a reconciliation of the lessons learned during a 2010 comprehensive evaluation of pertinent lessons learned from past and present high temperature gas-cooled reactors that apply to the Next Generation Nuclear Plant Project along with current and planned activities. The data used are from the latest Idaho National Laboratory research and development plans, the conceptual design report from General Atomics, and the pebble bed reactor technology readiness study from AREVA. Only those lessons related to the structures, systems, and components of the Next Generation Nuclear Plant (NGNP), as documented in the recently updated lessons learned report are addressed. These reconciliations are ordered according to plant area, followed by the affected system, subsystem, or component; lesson learned; and finally an NGNP implementation statement. This report (1) provides cross references to the original lessons learned document, (2) describes the lesson learned, (3) provides the current NGNP implementation status with design data needs associated with the lesson learned, (4) identifies the research and development being performed related to the lesson learned, and (5) summarizes with a status of how the lesson learned has been addressed by the NGNP Project.

  8. Lessons learned applying CASE methods/tools to Ada software development projects

    Science.gov (United States)

    Blumberg, Maurice H.; Randall, Richard L.

    1993-01-01

    This paper describes the lessons learned from introducing CASE methods/tools into organizations and applying them to actual Ada software development projects. This paper will be useful to any organization planning to introduce a software engineering environment (SEE) or evolving an existing one. It contains management level lessons learned, as well as lessons learned in using specific SEE tools/methods. The experiences presented are from Alpha Test projects established under the STARS (Software Technology for Adaptable and Reliable Systems) project. They reflect the front end efforts by those projects to understand the tools/methods, initial experiences in their introduction and use, and later experiences in the use of specific tools/methods and the introduction of new ones.

  9. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  10. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  11. "Frankenstein." [Lesson Plan].

    Science.gov (United States)

    Simon, Melanie

    Based on Mary Shelley's novel "Frankenstein," this lesson plan presents activities designed to help students understand that active readers interpret a novel (its characters, plot, setting, and theme) in different ways; and the great literature can be and has been adapted in many ways over time. The main activity of the lesson involves students…

  12. Bead Game Simulation. Lesson Plan.

    Science.gov (United States)

    Ripp, Ken

    This lesson plan offers students the opportunity to participate in the three basic economic systems (market, command, and tradition). By working in each of the systems, students will internalize the fundamental values present in each system and will gain insights into the basic advantages and disadvantages of each system. The lesson plan provides…

  13. Planning geometry lessons with learning platforms

    DEFF Research Database (Denmark)

    Tamborg, Andreas Lindenskov

    mathematics teachers’ joint planning of a lesson in geometry with a learning platform called Meebook is analyzed using the instrumental approach. It is concluded that the interface in Meebook orients the teachers work toward what the students should do rather than what they should learn, although the latter......This paper investigates how mathematics teachers plan lessons with a recently implemented Danish learning platform designed to support teachers in planning lessons in line with a recent objective-oriented curriculum. Drawing on data from observations of and interviews with teachers, three...... is a key intention behind the implementation of the platform. It is also concluded that when the teachers succeed in using learning objectives actively in their planning, the objectives support the teachers in designing lessons that correspond with their intentions. The paper concludes with a discussion...

  14. Lesson Planning with the Common Core

    Science.gov (United States)

    Estes, Linda A.; McDuffie, Amy Roth; Tate, Cathie

    2014-01-01

    Planning a lesson can be similar to planning a road trip--a metaphor the authors use to describe how they applied research and theory to their lesson planning process. A map and mode of transportation, the Common Core State Standards for Mathematics (CCSSM) and textbooks as resources, can lead to desired destinations, such as students engaging in…

  15. Understanding public sexual harassment : lesson plans and session guidance, key Stages 3 & 4.

    OpenAIRE

    Vera-Gray, F.; Bullough, J.

    2017-01-01

    These lesson plans have been written by Dr. Fiona Vera-Gray at Durham University and Jayne Bullough from Rape Crisis South London (RASASC). They were created through a partnership project with Doll’s Eye Theatre, Purple Drum, RASASC, Dr. Maria Garner, and Dr. Fiona Vera-Gray. Lessons on public sexual harassment were drawn from the work of Dr. Vera-Gray at Durham University. The project was made possible by Durham Law School’s Impact Acceleration Grant from the Economics and ...

  16. Lessons learned from decommissioning projects at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Salazar, M.

    1995-01-01

    This paper describes lessons learned over the last 20 years from 12 decommissioning projects at Los Alamos National Laboratory. These lessons relate both to overall program management and to management of specific projects during the planning and operations phases. The issues include waste management; the National Environmental Policy Act (NEPA); the Resource Conservation and Recovery Act (RCRA); the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); contracting; public involvement; client/customer interface; and funding. Key elements of our approach are to be proactive; follow the observation method; perform field activities concurrently; develop strategies to keep reportable incidents from delaying work; seek and use programs, methods, etc., in existence to shorten learning curves; network to help develop solutions; and avoid overstudying and overcharacterizing. This approach results in preliminary plans that require very little revision before implementation, reasonable costs and schedules, early acquisition of permits and NEPA documents, preliminary characterization reports, and contracting documents. Our track record is good -- the last four projects (uranium and plutonium-processing facility and three research reactors) have been on budget and on schedule

  17. Supporting teachers' technology integration in lesson plans

    NARCIS (Netherlands)

    Janssen, Noortje

    2017-01-01

    Lesson planning offers rich opportunities for teachers to consider and implement technology in the classroom. This dissertation investigated the design and effectiveness of supplementary information to assist pre-service teachers during the lesson planning process. Based on the Technological,

  18. Good Practice Lessons from the Urban Traffic Project, Denmark

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    In 1990, as the first government in the world, the Danish Cabinet approved a national action plan for sustainable transport. In 1992, as part of the implementation of this plan, the Urban Traffic Project was set up with the EPA. The policy situation was one of a state agency trying to motivate...... urban municipalities to work with T&E (transport and environment) integration, i.e. integration of concerns for safety, energy, air quality, noise etc. in urban traffic planning. 50 major urban municipalities participated in the project. The most important lessons to be learned from the project are: (1......) With a fairly modest investment (DKK 150 million in seed money) it has been possible on a voluntary basis to motivate the majority of urban municipalities to work with T&E integration. (2) The top motivating factor for municipalities to participate was a desire for organisational and professional learning. (3...

  19. Treating Social Anxiety in Adolescents: Ten Group Therapy Lesson Plans

    Science.gov (United States)

    Mazur-Elmer, Alison; McBride, Dawn

    2009-01-01

    This project provides a comprehensive overview of the research literature on social anxiety disorder (SAD) in adolescents and concludes by offering a set of 10 group therapy lesson plans for SAD that therapists can use in their practice. The overview includes a description of social anxiety disorder and highlights various theories of anxiety. The…

  20. Text Linguistics in Research Papers Prepared by University Students: Teaching through Lesson Plans and Textbooks

    Directory of Open Access Journals (Sweden)

    Manuel Albarrán-Santiago

    2015-01-01

    Full Text Available This research project revolves around the properties of text linguistics under a qualitative approach.  The author analyzed drafts of a research paper by two university students as well as lesson plans and textbooks of high school Spanish Language and Literature courses and lesson plans of courses from the Licentiate degree in Education.  According to the information from the drafts, students struggle with coherence and cohesion in writing; however, they succeed in choosing the correct language for the type of writing.  Difficulties are most likely due to fact that this topic is not included in secondary education plans and is not commonly addressed in textbooks or university classes.  In conclusion, teachers should include the properties of text linguistics in their lesson plans in order to help students overcome these difficulties.

  1. Keiko, Killer Whale. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    This lesson plan presents activities designed to help students understand that Keiko, the killer whale, lived for a long time in an aquarium and had to be taught to live independently; and that computer users can get updates on how Keiko is doing. The main activity of the lesson involves middle school students working in small groups to produce a…

  2. Development of short Indonesian lesson plan to improve teacher performance

    Science.gov (United States)

    Yulianto, B.; Kamidjan; Ahmadi, A.; Asteria, P. V.

    2018-01-01

    The developmental research was motivated by the results of preliminary study through interviews, which revealed almost all of the teachers did not create lesson plan themselves. As a result of this load, the performance of the real learning in the classroom becomes inadequate. Moreover, when lesson plan was not made by teachers themselves, the learning process becomes ineffective. Therefore, this study designed to develop a prototype of the short lesson plan, in particular, Indonesian language teaching, and to investigate its effectiveness. The participants in the study were teachers who were trained through lesson study group to design short model’s lesson plan. Questionnaires and open-ended questions were used, and the quantitative and qualitative data obtained were analyzed accordingly. The analysis of the quantitative data, aided with SPSS, were frequency, percentage, and means, whereas the qualitative data were analyzed descriptively. The results showed that the teachers liked the model, and they were willing to design their own lesson plan. The observation data revealed that the classroom learning process became more interactive, and classroom atmosphere was more engaging and natural because the teachers did not stick to the lesson plan made by other teachers.

  3. BiteScis: Connecting K-12 teachers with science graduate students to produce lesson plans on modern science research

    Science.gov (United States)

    Battersby, Cara

    2016-01-01

    Many students graduate high school having never learned about the process and people behind modern science research. The BiteScis program addresses this gap by providing easily implemented lesson plans that incorporate the whos, whats, and hows of today's scienctific discoveries. We bring together practicing scientists (motivated graduate students from the selective communicating science conference, ComSciCon) with K-12 science teachers to produce, review, and disseminate K-12 lesson plans based on modern science research. These lesson plans vary in topic from environmental science to neurobiology to astrophysics, and involve a range of activities from laboratory exercises to art projects, debates, or group discussion. An integral component of the program is a series of short, "bite-size" articles on modern science research written for K-12 students. The "bite-size" articles and lesson plans will be made freely available online in an easily searchable web interface that includes association with a variety of curriculum standards. This ongoing program is in its first year with about 15 lesson plans produced to date.

  4. Plant Identification Characteristics for Deciduous Trees & Shrubs. Lesson Plans.

    Science.gov (United States)

    Burkholder, Kathy

    This manual contains a group of lesson plans designed for use with a slide series (not included here). Its purpose is to introduce students to the basic concepts and terminology used in the identification of deciduous trees and shrubs. The manual is composed of 12 lesson plans. The first lesson is an introduction to plant identification. The…

  5. Recycling Lesson Plan

    Science.gov (United States)

    Okaz, Abeer Ali

    2013-01-01

    This lesson plan designed for grade 2 students has the goal of teaching students about the environmental practice of recycling. Children will learn language words related to recycling such as: "we can recycle"/"we can't recycle" and how to avoid littering with such words as: "recycle paper" and/or "don't throw…

  6. Medical faculty members' attitude on lesson planning Semnan University of Medical Sciences

    Directory of Open Access Journals (Sweden)

    Masomeh Saberian

    2003-01-01

    Full Text Available Background: Lesson planning has a distinct role in enhancing education quality, as well as maintaining the friendly and dynamic atmosphere of the academic environment and increasing student's initiatives for achieving better educational attainments. Lesson planning is a process for defining the goals, understanding the needs, and specifying available tools and possible limitations. Lesson planning is a written description of this process, which shows the materials, the route, the time, and the place of instructions, as well as a method for evaluating students. Purpose: to identify the attitudes of Semnan University of Medical Sciences (SUMS on lesson planning. Methods: Fifty-three faculty members of the SUMS participated in this study. A questionnaire was used, which contained 8 demographic questions, and 24 r questions for identification the faculty members' attitude. Questionnaires were distributed among the faculty members in sealed envelopes, without denoting their names. The questionnaires were gathered after being completed. Results were analyzed by calculating the mean, standard deviation, absolute and relative frequencies, and using Chi-square and Fischer exact test at the level of 5%. Results: II was shown that 88% of faculty members favoured lesson planning before the beginning of the semester. But they found lesson planning a difficult task, because of their heavy workload. Of the faculty members, 60.4% organized their teaching classes according to a designed lesson plan, and believed that it did affect the quality of their teaching, but 49.1% disagreed with distributing the designed lesson plan among the students. Discussion: Although professor favoured lesson planning and find it necessary to work according to such a plan, workload and lack of knowledge are defined as two main obstacles in doing so. It is believed that by decreasing the professor's workload and provision of lesson planning workshops, these problems could be solved

  7. Developing tools for the safety specification in risk management plans: lessons learned from a pilot project.

    Science.gov (United States)

    Cooper, Andrew J P; Lettis, Sally; Chapman, Charlotte L; Evans, Stephen J W; Waller, Patrick C; Shakir, Saad; Payvandi, Nassrin; Murray, Alison B

    2008-05-01

    Following the adoption of the ICH E2E guideline, risk management plans (RMP) defining the cumulative safety experience and identifying limitations in safety information are now required for marketing authorisation applications (MAA). A collaborative research project was conducted to gain experience with tools for presenting and evaluating data in the safety specification. This paper presents those tools found to be useful and the lessons learned from their use. Archive data from a successful MAA were utilised. Methods were assessed for demonstrating the extent of clinical safety experience, evaluating the sensitivity of the clinical trial data to detect treatment differences and identifying safety signals from adverse event and laboratory data to define the extent of safety knowledge with the drug. The extent of clinical safety experience was demonstrated by plots of patient exposure over time. Adverse event data were presented using dot plots, which display the percentages of patients with the events of interest, the odds ratio, and 95% confidence interval. Power and confidence interval plots were utilised for evaluating the sensitivity of the clinical database to detect treatment differences. Box and whisker plots were used to display laboratory data. This project enabled us to identify new evidence-based methods for presenting and evaluating clinical safety data. These methods represent an advance in the way safety data from clinical trials can be analysed and presented. This project emphasises the importance of early and comprehensive planning of the safety package, including evaluation of the use of epidemiology data.

  8. The impact of curricula and lesson planning in the teaching process

    Directory of Open Access Journals (Sweden)

    Majlinda Lika

    2017-03-01

    Full Text Available Lesson planning is at the core of teaching. It allows teachers to create an orientation path in the process of teaching, taking into consideration, many elements such as, students’ styles of learning, previous knowledge, types of intelligences, interests etc. Effective curricula plans are characterized by principles of coherence, flexibility, integration of knowledge etc. Effective lesson plans strongly rely on previous information gathered through different forms of assessment, and provide inclusive opportunities for every student. This paper will show how planning affects teaching and the quality of learning. First, a review of the literature will represent the importance of flexible planning and incorporation of differentiated elements of planning that ensure inclusive opportunities of learning for all students. Second, there will be a detailed analysis of findings taken by 25 full school inspections practices on the field of “lesson planning”. This part of the study will specify the planning difficulties the teachers face and how this affects the process of teaching and learning. Third, benefits of lesson plans that rely on good assessment practices and integrate differentiated instruction according to students' needs will be discussed as ways of helping teachers adjust lesson plans to overcome their planning difficulties. Findings indicate that teachers design lesson plans that do not rely on good assessment practices. Lesson plans are not flexible enough to respond and satisfy the needs of all categories of students, impacting that way the quality of instruction and learning. The paper will serve teachers to review their planning approaches and integrate elements of differentiated instruction as an organic part of the process, responding to traits and uniqueness students represent.

  9. Integrating self-regulated learning and discovery learning into English lesson plan

    Directory of Open Access Journals (Sweden)

    Sayukti Ni Kadek Heny

    2018-01-01

    Full Text Available The notion of learner-centeredness has been embedded in the National Curriculum of Indonesia, 2013 Curriculum. However, most of the teachers seem to be hardly acquainted with the concept of Self-Regulated Learning (SRL and discovery learning in the lesson planning. Considering the phenomenon, this study intends to explore the concept of Self-Regulated Learning in the lesson plan of English subject for a tenth-grade level by employing a qualitative design with data obtained from a teacher-made lesson plan and a semi-structured interview. The researcher used content analysis to analyze the lesson plan. Meanwhile, the qualitative data from interview result were preceded through a coding sheet and transcribed modified figure. The findings revealed an integration of SRL cyclical phase and discovery learning in the teacher-made lesson plan. Based on the discussion, the results need to be applied in a considerably large context, in order to see thoroughly dynamic integration between Self-Regulated Learning model, lesson planning and the concept of learner autonomy.

  10. Validitas Lesson Plan Berbasis Multiple Intelligences untuk Pembelajaran Matematika

    Directory of Open Access Journals (Sweden)

    Vigih Hery Kristanto

    2017-12-01

    Full Text Available The purpose of this research is to know the validity of Lesson Plan based on multiple intelligences for learning mathematics in junior high school students. This research is a simple research with qualitative type. The validity of Lesson Plan is seen through two aspects, namely the linguistic aspect and the substance (content aspect. Thus, the instrument used in this research is the Linguistic Aspects Validation Guidance and the Substance Validation Guidelines (contents Guidance. Validation is done by two validators Lingusitic expert field and Mathematics expert field. The results showed that the validity of linguistic aspects of 3.35 and the validity of the substance (content of 3.82, so it can be concluded Lesson Plan based multiple intelligences for learning mathematics in junior high school students who have been compiled valid based on the language aspect. In addition, Lesson Plan based multiple intelligences for learning mathematics in junior high school students who have been compiled valid based on aspects of substance (content.

  11. What Are the Effects of Science Lesson Planning in Peers?—Analysis of Attitudes and Knowledge Based on an Actor-Partner Interdependence Model

    Science.gov (United States)

    Smit, Robbert; Rietz, Florian; Kreis, Annelies

    2018-06-01

    This study focuses on the effects of collaborative lesson planning by science pre-service teachers on their attitudes and knowledge. In our study, 120 pre-service teachers discussed a preparation for a science inquiry lesson in dyads. The teacher with the lesson preparation had the role of the coachee, while the other was the coach. We investigated the following research questions: (1) Does learning occur between the two peers? and (2) Is the competency in lesson planning affected by the attitude and knowledge of coach and coachee? Based on an actor-partner interdependence model (APIM), we could clarify the relations of pedagogical content knowledge (PCK) and attitudes (ATT) between and within the dyads of coach and coachee, as well as their development over time. Furthermore, the APIM allowed the inclusion of a mediator (lesson planning competency). Both PCK and ATT increased slightly but significantly during our project. ATT and PCK seemed to converge between coach and coachee at the end of the project. However, we could not find any cross-lagged effects, meaning there was no effect of coach on coachee or vice versa over time. Further, preceding PCK showed a significant effect on the competency of lesson planning, but planning competency did not influence succeeding PCK or attitude. Finally, these results are discussed with respect to science teacher education.

  12. What Are the Effects of Science Lesson Planning in Peers?—Analysis of Attitudes and Knowledge Based on an Actor-Partner Interdependence Model

    Science.gov (United States)

    Smit, Robbert; Rietz, Florian; Kreis, Annelies

    2017-04-01

    This study focuses on the effects of collaborative lesson planning by science pre-service teachers on their attitudes and knowledge. In our study, 120 pre-service teachers discussed a preparation for a science inquiry lesson in dyads. The teacher with the lesson preparation had the role of the coachee, while the other was the coach. We investigated the following research questions: (1) Does learning occur between the two peers? and (2) Is the competency in lesson planning affected by the attitude and knowledge of coach and coachee? Based on an actor-partner interdependence model (APIM), we could clarify the relations of pedagogical content knowledge (PCK) and attitudes (ATT) between and within the dyads of coach and coachee, as well as their development over time. Furthermore, the APIM allowed the inclusion of a mediator (lesson planning competency). Both PCK and ATT increased slightly but significantly during our project. ATT and PCK seemed to converge between coach and coachee at the end of the project. However, we could not find any cross-lagged effects, meaning there was no effect of coach on coachee or vice versa over time. Further, preceding PCK showed a significant effect on the competency of lesson planning, but planning competency did not influence succeeding PCK or attitude. Finally, these results are discussed with respect to science teacher education.

  13. Planning, managing and organizing the decommissioning of nuclear facilities: Lessons learned

    International Nuclear Information System (INIS)

    2004-05-01

    This publication is intended to encourage the development and improvement of decommissioning planning and management techniques, with the focus on organizational aspects, reduce the duplication of efforts by different parties by transfer of experience and know-how, and provide useful results for those Member States planning or implementing decommissioning projects. In general it can be stated that any decommissioning project can be completed without any deleterious effects on the safety of the workforce and the public or any identifiable impact on the environment. However, timeliness and cost-effectiveness are not always optimal. It has been noted on several occasions that the major weakness in decommissioning projects (as well as in other industrial projects) is often not the lack of technologies, but rather poor planning and management. This publication intends to stimulate awareness of the need for early and efficient planning and to foster developments in management and organization in association with planned or ongoing decommissioning projects. A companion report on Organization and Management for Decommissioning of Large Nuclear Facilities was published by the IAEA in 2000 (Technical Report Series (TRS) No. 399). That TRS provides generic guidance on organizational and management aspects. This TECDOC is complementary to the existing report in that it highlights practical experience - in particular, typical issues, evidence of poor management, undue delays, and lack of timely funding - and distils lessons learned from this experience

  14. Lessons Learned for Decommissioning Planning

    International Nuclear Information System (INIS)

    Sohn, Wook; Kim, Young-gook; Kim, Hee-keun

    2015-01-01

    The purpose of this paper is to introduce the U.S. nuclear industrial's some key lessons learned especially for decommissioning planning based on which well informed decommissioning planning can be carried out. For a successful decommissioning, it is crucial to carry out a well-organized decommissioning planning before the decommissioning starts. This paper discussed four key factors which should be decided or considered carefully during the decommissioning planning period with introduction of related decommissioning lessons learned of U.S. nuclear industry. Those factors which have been discussed in this paper include the end state of a site, the overall decommissioning strategy, the management of the spent fuels, and the spent fuel pool island. Among them, the end state of a site should be decided first as it directs the whole decommissioning processes. Then, decisions on the overall decommissioning strategy (DECON vs. SAFSTOR) and the management of the spent fuels (wet vs. dry) should follow. Finally, the spent fuel pool island should be given due consideration because its implementation will result in much cost saving. Hopefully, the results of this paper would provide useful inputs to performing the decommissioning planing for the Kori unit 1

  15. How to Analyze Routines in Teachers' Thinking Processes during Lesson Planning.

    Science.gov (United States)

    Bromme, Rainer

    A justification for the study of teachers' routines, as they affect the preparation of lesson plans, prefaces this paper on teachers' thought processes during lesson planning. In focusing on the importance of research into teachers' routines, it is pointed out that lesson preparation and classroom routines permit teachers to direct attention to…

  16. Brothers Grimm. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    Based on Grimm's fairy tales, this lesson plan presents activities designed to help students understand that fairy tales connect them to earlier generations, help them think about present situations, that magic figures prominently in fairy tales, and that fairy tales can inspire readers to create original works of art. The main activity in the…

  17. Smart Consumer Lesson Plans.

    Science.gov (United States)

    New Jersey Consortium for Consumer Education, Newark.

    Lesson plans are provided for use with different populations of pre-K through senior high school students in four different areas of consumer education. Eight units in advertising are included: A First Look at Ads (pre-K-Grade 3), Don't Judge a Book by Its Cover (Grades 1-3), Fatal Distraction (Junior High), Package Labeling (Junior High), Product…

  18. English language-in-education: A lesson planning model for subject ...

    African Journals Online (AJOL)

    English language-in-education: A lesson planning model for subject teachers. ... lack of critical academic language skills in English as the Language of Learning and ... process of lesson design and the 'forward' process of lesson presentation.

  19. XML technology planning database : lessons learned

    Science.gov (United States)

    Some, Raphael R.; Neff, Jon M.

    2005-01-01

    A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

  20. The Paper Airplane Challenge: A Market Economy Simulation. Lesson Plan.

    Science.gov (United States)

    Owens, Kimberly

    This lesson plan features a classroom simulation that helps students understand the characteristics of a market economic system. The lesson plan states a purpose; cites student objectives; suggests a time duration; lists materials needed; and details a step-by-step teaching procedure. The "Paper Airplane Challenge" handout is attached. (BT)

  1. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  2. Children of War. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    This lesson plan presents activities in which students read, analyze, and discuss excerpts from children's war diaries; and create a storyboard for a public service announcement on children's rights in wartime. It includes objectives, materials, procedures, extension activities, excerpts of children's war diaries, suggested readings, and web…

  3. Patient and Stakeholder Engagement in the PCORI Pilot Projects: Description and Lessons Learned.

    Science.gov (United States)

    Forsythe, Laura P; Ellis, Lauren E; Edmundson, Lauren; Sabharwal, Raj; Rein, Alison; Konopka, Kristen; Frank, Lori

    2016-01-01

    Patients and healthcare stakeholders are increasingly becoming engaged in the planning and conduct of biomedical research. However, limited research characterizes this process or its impact. We aimed to characterize patient and stakeholder engagement in the 50 Pilot Projects funded by the Patient-Centered Outcomes Research Institute (PCORI), and identify early contributions and lessons learned. A self-report instrument was completed by researchers between 6 and 12 months following project initiation. Forty-seven principal investigators or their designees (94 % response rate) participated in the study. MAIN MEASURES Self-report of types of stakeholders engaged, stages and levels of engagement, facilitators and barriers to engagement, lessons learned, and contributions from engagement were measured. Most (83 %) reported engaging more than one stakeholder in their project. Among those, the most commonly reported groups were patients (90 %), clinicians (87 %), health system representatives (44 %), caregivers (41 %), and advocacy organizations (41 %). Stakeholders were commonly involved in topic solicitation, question development, study design, and data collection. Many projects engaged stakeholders in data analysis, results interpretation, and dissemination. Commonly reported contributions included changes to project methods, outcomes or goals; improvement of measurement tools; and interpretation of qualitative data. Investigators often identified communication and shared leadership strategies as "critically important" facilitators (53 and 44 % respectively); lack of stakeholder time was the most commonly reported challenge (46 %). Most challenges were only partially resolved. Early lessons learned included the importance of continuous and genuine partnerships, strategic selection of stakeholders, and accommodation of stakeholders' practical needs. PCORI Pilot Projects investigators report engaging a variety of stakeholders across many stages of research, with specific

  4. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    Nirider, L. Tom

    2003-08-06

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D&D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D&D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D&D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D&D activities. A reference section is included to provide additional information. This document does not address D&D lessons learned that are not pertinent to criticality safety.

  5. Anticipating students' reasoning and planning prompts in structured problem-solving lessons

    Science.gov (United States)

    Vale, Colleen; Widjaja, Wanty; Doig, Brian; Groves, Susie

    2018-02-01

    Structured problem-solving lessons are used to explore mathematical concepts such as pattern and relationships in early algebra, and regularly used in Japanese Lesson Study research lessons. However, enactment of structured problem-solving lessons which involves detailed planning, anticipation of student solutions and orchestration of whole-class discussion of solutions is an ongoing challenge for many teachers. Moreover, primary teachers have limited experience in teaching early algebra or mathematical reasoning actions such as generalising. In this study, the critical factors of enacting the structured problem-solving lessons used in Japanese Lesson Study to elicit and develop primary students' capacity to generalise are explored. Teachers from three primary schools participated in two Japanese Lesson Study teams for this study. The lesson plans and video recordings of teaching and post-lesson discussion of the two research lessons along with students' responses and learning are compared to identify critical factors. The anticipation of students' reasoning together with preparation of supporting and challenging prompts was critical for scaffolding students' capacity to grasp and communicate generality.

  6. The 'Amistad' Case. Lesson Plan.

    Science.gov (United States)

    National Archives and Records Administration, Washington, DC.

    Teaching about the Amistad case provides correlations to the National Standards for History, and Civics and Government. An overview of the events of 1839 is given in this lesson plan. Seven student activities include reading and using primary source documents, writing journal articles, viewing the movie "Amistad," and giving…

  7. Collecting lessons learned : How project-based organizations in the oil and gas industry learn from their projects

    NARCIS (Netherlands)

    Buttler, T.

    2016-01-01

    Project-based organizations collect lessons learned in order to improve the performance of projects. They aim to repeat successes by using positive lessons learned, and to avoid repeating negative experiences by using negative lessons learned. Cooke-Davies (2002) claimed that the ability to learn

  8. Machiavelli's "The Prince." [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    Based on Machiavelli's book "The Prince," this lesson plan presents activities designed to help students understand that Machiavelli's enumeration of leadership qualities for a prince has always been controversial; and that leaders and followers may differ in what they identify as the qualities of a good leader. The main activity of the lesson…

  9. "Pride and Prejudice". [Lesson Plan].

    Science.gov (United States)

    Soderquist, Alisa

    Based on Jane Austen's novel "Pride and Prejudice," this lesson plan presents activities designed to help students understand that classics are those pieces of literature that continue to be popular long after they were written; classics tend to have universal themes; and Austen's writing has been updated and dramatized and, most likely, will…

  10. The impact of curricula and lesson planning in the teaching process

    OpenAIRE

    Majlinda Lika

    2017-01-01

    Lesson planning is at the core of teaching. It allows teachers to create an orientation path in the process of teaching, taking into consideration, many elements such as, students’ styles of learning, previous knowledge, types of intelligences, interests etc. Effective curricula plans are characterized by principles of coherence, flexibility, integration of knowledge etc. Effective lesson plans strongly rely on previous information gathered through different forms of assessment, and provide i...

  11. For Sale: Your Lesson Plans

    Science.gov (United States)

    Greene, Kim

    2016-01-01

    The last several years has seen an increasingly popular trend of teachers buying and selling their lesson plans and other self-created classroom materials in online marketplaces. The leader in this space is a website called Teachers Pay Teachers, which boasts 3.8 million active users. In this article, the author examines why these sites became…

  12. The Great Gatsby. [Lesson Plan].

    Science.gov (United States)

    Zelasko, Ken

    Based on F. Scott Fitzgerald's novel "The Great Gatsby," this lesson plan presents activities designed to help students understand that adapting part of a novel into a dramatic reading makes students more intimate with the author's intentions and craft; and that a part of a novel may lend itself to various oral interpretations. The main activity…

  13. Go West: Imagining the Oregon Trail. [Lesson Plan].

    Science.gov (United States)

    National Endowment for the Humanities (NFAH), Washington, DC.

    In this lesson plan, students in grades 3-5 compare imagined travel experiences of their own with the actual experiences of 19th-century pioneers on the Oregon Trail. After the 4 lessons students will have: (1) learned about the pioneer experience on the Oregon Trail; (2) compared and contrasted modern-day travel experiences with those of the 19th…

  14. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2003-01-01

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D and D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D and D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D and D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D and D activities. A reference section is included to provide additional information. This document does not address D and D lessons learned that are not pertinent to criticality safety

  15. The Fernald Closure Project: Lessons Learned

    International Nuclear Information System (INIS)

    Murphy, Cornelius M.; Carr, Dennis

    2008-01-01

    For nearly 37 years, the U.S. Department of Energy site at Fernald - near Cincinnati, Ohio - produced 230,000 metric tons (250,000 short tons) of high-purity, low-enriched uranium for the U.S. Defense Program, generating more than 5.4 million metric tons (6 million short tons) of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion mega environmental-remediation project that was completed in October 2006. Project evolved through four phases: - Conducting remedial-investigation studies to determine the extent of damage to the environment and groundwater at, and adjacent to, the production facilities; - Selecting cleanup criteria - final end states that had to be met that protect human health and the environment; - Selecting and implementing the remedial actions to meet the cleanup goals; - Executing the work in a safe, compliant and cost-effective manner. In the early stages of the project, there were strained relationships - in fact total distrust - between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholders groups in the decision-making process, the DOE and Fluor developed a public-participation strategy to open the channels of communication with the various parties: site leadership, technical staff and regulators. This approach proved invaluable to the success of the project, which has become a model for future environmental remediation projects. This paper will summarize the history and shares lessons learned: the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies achieved. Lessons learned fall into ten categories: - Regulatory approach with end

  16. Iranian EFL Teachers' Attitudes towards Lesson Planning Based on Their Gender

    Science.gov (United States)

    Heidari, Mina; Azizifar, Akbar; Gowhary, Habib; Abbasi, Zahra

    2015-01-01

    The purpose of this study was to examine Iranian EFL teachers' attitudes towards lesson plan based on their gender. The research is a quantitative study in which the data is obtained to get a great understanding on the relationship between lesson plan of Iranian English as Foreign Language (EFL) teachers and teachers' gender. The population…

  17. Most Effective Practices in Lesson Planning

    Science.gov (United States)

    Womack, Sid T.; Pepper, Stephanie; Hanna, Shellie L.; Bell, Columbus David

    2015-01-01

    In a previous study with 130 undergraduate teacher candidates from all licensure levels, data on candidate effectiveness were examined using factor analysis. Four factors were found in effective teaching, those being lesson planning, teacher and student reflection, safe school environment, and teacher professionalism. The present study followed…

  18. From Autopsy to Biopsy: A Metacognitive View of Lesson Planning and Teacher Trainees in ELT

    Science.gov (United States)

    Liyanage, Indika; Bartlett, Brendan John

    2010-01-01

    Lesson planning and implementation of those plans are complex and cognitively demanding for English Language Teacher trainees preparing for the profession. Many find it difficult to develop a lesson holistically and to maintain alignment across aims, procedural steps, and evaluation when planning and implementing a lesson. We attempted to address…

  19. Transformation of topic-specific professional knowledge into personal pedagogical content knowledge through lesson planning

    Science.gov (United States)

    Stender, Anita; Brückmann, Maja; Neumann, Knut

    2017-08-01

    This study investigates the relationship between two different types of pedagogical content knowledge (PCK): the topic-specific professional knowledge (TSPK) and practical routines, so-called teaching scripts. Based on the Transformation Model of Lesson Planning, we assume that teaching scripts originate from a transformation of TSPK during lesson planning: When planning lessons, teachers use their TSPK to create lesson plans. The implementation of these lesson plans and teachers' reflection upon them lead to their improvement. Gradually, successful lesson plans are mentally stored as teaching scripts and can easily be retrieved during instruction. This process is affected by teacher's beliefs, motivation and self-regulation. In order to examine the influence of TSPK on teaching scripts as well as the moderating effects of beliefs, motivation and self-regulation, we conducted a cross-sectional study with n = 49 in-service teachers in physics. The TSPK, beliefs, motivation, self-regulation and the quality of teaching scripts of in-service teachers were assessed by using an online questionnaire adapted to teaching the force concept and Newton's law for 9th grade instruction. Based on the measurement of the quality of teaching scripts, the results provide evidence that TSPK influences the quality of teaching scripts. Motivation and self-regulation moderate this influence.

  20. Lesson plan profile of senior high school biology teachers in Subang

    Science.gov (United States)

    Rohayati, E.; Diana, S. W.; Priyandoko, D.

    2018-05-01

    Lesson plan have important role for biology teachers in teaching and learning process. The aim of this study was intended to gain an overview of lesson plan of biology teachers’ at Senior High Schools in Subang which were the members of biology teachers association in Subang. The research method was descriptive method. Data was collected from 30 biology teachers. The result of study showed that lesson plan profile in terms of subject’s identity had good category with 83.33 % of average score. Analysis on basic competence in fair category with 74.45 % of average score. The compatibility of method/strategy was in fair category with average score 72.22 %. The compatibility of instrument, media, and learning resources in fair category with 71.11 % of average score. Learning scenario was in good category with 77.00 % of average score. The compatibility of evaluation was in low category with 56.39 % of average score. It can be concluded that biology teachers in Subang were good enough in making lesson plan, however in terms of the compatibility of evaluation needed to be fixed. Furthermore, teachers’ training for biology teachers’ association was recommended to increasing teachers’ skill to be professional teachers.

  1. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  2. Virtual reality in decommissioning projects: experiences, lessons learned and future plans

    International Nuclear Information System (INIS)

    Rindahl, G.; Mark, N.K.F.; Meyer, G.

    2006-01-01

    The work on Virtual Reality (VR) tools for decommissioning planning, dose estimation and work management started at the Norwegian Institute for Energy Technology (IFE) in 1999 in the VR dose project with Japan Nuclear Cycle development institute (JNC), now JAEA. The main aim of this effort has been to help minimize workers' radiation exposure, as well as help to achieve more efficient use of human resources. VR dose is now used in the decommissioning of one of JNC's reactors, the Fugen Nuclear Power Station. This VR decommissioning project has later resulted in a series of projects and applications. In addition to decommissioning, IFE also put great focus on two other branches of VR tools, namely tools for knowledge management, training and education in operating facilities and tools for control room design. During the last years, this work, beginning at different ends, has been converging more and more towards VR technology for use through out the life cycle of a facility. A VR training simulator for a refuelling machine of the Leningrad NPP (LNPP) developed in cooperation with the Russian Research Centre Kurchatov Institute (RRC KI) is now planned to be used in connection with the decommissioning of the three intact reactors at Chernobyl in Ukraine. In this paper we describe experiences from use of VR in decommissioning processes, as well as results from bringing the VR technology initially developed for planned or productive facilities into the decommissioning toolbox. (author)

  3. Winter Secrets: An Instant Lesson Plan.

    Science.gov (United States)

    Collyer, Cam

    1997-01-01

    Outdoor lesson plan aims to stimulate student interest in animals' adaptations to winter and the various signs and clues to animal behavior. Includes questions for class discussion, tips for guiding the hike, and instructions for two games that illustrate the predator-prey relationship. Notes curriculum connections to the East York (Ontario) Board…

  4. Twain's "Hannibal." Learning Page Lesson Plan.

    Science.gov (United States)

    Wood, Jan; Thiese, Norma

    Writers are influenced by their environment including family, community, lifestyle, or location. One such writer was Mark Twain. With this lesson plan the learner will become familiar with and analyze life around Mark Twain's hometown, Hannibal, Missouri, during the latter half of the 19th century by using various online and print resources to…

  5. Interrogating the Lesson Plan in a Pre-Service Methods Course: Evidence from a University in Kenya

    Science.gov (United States)

    Simwa, Kefa L.; Modiba, Maropeng

    2015-01-01

    The paper reports on research that examined how the content of a History methods course, taught in a university in Kenya, influenced student teachers' lesson planning and pedagogical skills. A lecture on a lesson plan, micro-teaching lesson plan documents and presentations were examined to determine student teachers' preparedness for teaching the…

  6. The Media and Controlled Substances; Anti-Drug Legislation. Lesson Plans.

    Science.gov (United States)

    Laverdure, Sharon

    1991-01-01

    Provides two lesson plans for classroom use. Focuses on media influence on the use of alcohol and tobacco and on regulatory laws and their effect on drug use. Identifies connections that can be made to textbooks and magazine articles, as well as suggestions for opening, developing, and concluding each lesson. (DK)

  7. Seeking Comfort: How and Why Preservice Teachers Use Internet Resources for Lesson Planning

    Science.gov (United States)

    Sawyer, Amanda G.; Myers, Joy

    2018-01-01

    This study examined 158 lesson plans at one institution across two teacher education programs, inclusive early childhood and elementary education, to determine the impact of Internet usage as inspiration on preservice teachers' lesson plans. Fisher's exact test determined statistically significant differences between the Internet use of preservice…

  8. No Light at the End of Tunnel Vision: Steps for Improving Lesson Plans

    Science.gov (United States)

    Dunn, Rita; Craig, Martin; Favre, Lois; Markus, Doron; Pedota, Paul; Sookdeo, Gale; Stock, Jessica; Terry, Brian

    2010-01-01

    The authors of this article believe that the current structure of lesson plans impede differentiation, individualization, and innovation and offer little in assessing the quality of teaching and learning. Concrete steps will be offered for planning to better respond to student diversity in meeting lesson objectives. (Contains 1 figure.)

  9. Project LEAN--lessons learned from a national social marketing campaign.

    Science.gov (United States)

    Samuels, S E

    1993-01-01

    The Henry J. Kaiser Family Foundation initiated a social marketing campaign in 1987 to reduce the nation's risk for heart disease and some cancers. Consensus on recommendations for dietary change have stimulated the development of a variety of social marketing campaigns to promote behavior change. Project LEAN (Low-Fat Eating for America Now) is a national campaign whose goal is to reduce dietary fat consumption to 30 percent of total calories through public service advertising, publicity, and point-of-purchase programs in restaurants, supermarkets, and school and worksite cafeterias. The public service advertising reached 50 percent of the television viewing audience and the print publicity, more than 35 million readers. The toll-free hotline received more than 300,000 calls. Thirty-four organizations joined the foundation in partnership and raised $350,000 for collaborative activities. Thirteen States implemented local campaigns. Lessons have been learned about the use of the media, market segmentation, effective spokespersons, and successful partnerships. These lessons will be valuable to others planning social marketing campaigns on nutrition and other preventive behaviors.

  10. A summary of lessons learned activities conducted at the OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    Hallbert, B.P.

    1997-01-01

    A series of lessons learned studies have been conducted at the OECD Halden Reactor Project. The purpose of these lessons learned reports are to summarize knowledge and experience gained across a number of research project. This paper presents a summary of main issues addressed in four of these lessons learned projects. These are concerned with software development and quality assurance, software reliability, methods for test and evaluation of developed systems, and the evaluation of system design features

  11. Righting Your Future: LRE Lesson Plans for Today and Tomorrow.

    Science.gov (United States)

    CRADLE: Center for Research and Development in Law-Related Education, Winston-Salem, NC.

    A compilation of more than 50 lesson plans on law related education, these materials were written by middle school and high school teachers from around the United States. The lessons cover a broad range of topics including "DNA Fingerprints and the Constitutional Right to Privacy"; "Censorship and Book Banning in Public Schools"; "The Death…

  12. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, M.; Brooks, S.; Miller, J.; Neal, P.; Mason, R.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites by various technical groups. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (concluded 2011 March), in planning the three-year second phase (currently being commenced), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Several internal and external reviews of the Program during the start-up phase examined progress and identified several improvements to planning. These improvements included strengthening communications among the groups within the Program, conducting more detailed advance planning of the interlinked activities, and being cautious about making detailed commitments for activities for which major decisions had yet to be made. The second phase was planned by a dedicated core team. More and earlier input was solicited from the suppliers than in the planning for the first phase. This was to ensure that the proposed program of work was feasible, and to be able to specify in more detail the resources that would be required to carry it out. The NLLP has developed several processes to assist in the detailed planning of the numerous projects and

  13. ADVANTAGES, DISADVANTAGES, AND LESSONS LEARNED FROM MULTI-REACTOR DECOMMISSIONING PROJECTS

    International Nuclear Information System (INIS)

    Morton, M.R.; Nielson, R.R.; Trevino, R.A.

    2003-01-01

    This paper discusses the Reactor Interim Safe Storage (ISS) Project within the decommissioning projects at the Hanford Site and reviews the lessons learned from performing four large reactor decommissioning projects sequentially. The advantages and disadvantages of this multi-reactor decommissioning project are highlighted

  14. Lessons learnt from Ignalina NPP decommissioning project

    International Nuclear Information System (INIS)

    NAISSE, Jean-Claude

    2007-01-01

    The Ignalina Nuclear Power Plant (INPP) is located in Lithuania, 130 km north of Vilnius, and consists of two 1500 MWe RBMK type units, commissioned respectively in December 1983 and August 1987. On the 1. of May 2004, the Republic of Lithuania became a member of the European Union. With the protocol on the Ignalina Nuclear Power in Lithuania which is annexed to the Accession Treaty, the Contracting Parties have agreed: - On Lithuanian side, to commit closure of unit 1 of INPP before 2005 and of Unit 2 by 31 December 2009; - On European Union side, to provide adequate additional Community assistance to the efforts of Lithuania to decommission INPP. The paper is divided in two parts. The first part describes how, starting from this agreement, the project was launched and organized, what is its present status and which activities are planned to reach the final ambitious objective of a green field. To give a global picture, the content of the different projects that were defined and the licensing process will also be presented. In the second part, the paper will focus on the lessons learnt. It will explain the difficulties encountered to define the decommissioning strategy, considering both immediate or differed dismantling options and why the first option was finally selected. The paper will mention other challenges and problems that the different actors of the project faced and how they were managed and solved. The paper will be written by representatives of the Ignalina NPP and of the Project Management Unit. (author)

  15. Radiological Control Technician: Phase 1, Site academic training lesson plans

    International Nuclear Information System (INIS)

    1992-10-01

    This volume provides lesson plans for training radiological control technicians. Covered here is basic radiological documentation, counting errors, dosimetry, environmental monitoring, and radiation instruments

  16. A Lesson Plan Incorporating Collaborative Strategic Reading

    Institute of Scientific and Technical Information of China (English)

    陈江萍

    2017-01-01

    This essay is going to have an in-depth analysis of the Collaborative Strategic Reading, a four-step reading comprehen-sion strategy popular in the Western classrooms. It will start with some brief introduction about this instructional approach in company with its theoretical rationale and research evidence for its effectiveness of improving learners 'reading competence. Fo-cused on the previewing skill, the first step of the reading instruction, a modified lesson plan is designed in the Chinese high school setting, followed by justification of the major elements of the plan, and some practical implications.

  17. A Lesson Plan Incorporating Collaborative Strategic Reading

    Institute of Scientific and Technical Information of China (English)

    陈江萍

    2017-01-01

    This essay is going to have an in-depth analysis of the Collaborative Strategic Reading, a four-step reading comprehen?sion strategy popular in the Western classrooms. It will start with some brief introduction about this instructional approach in company with its theoretical rationale and research evidence for its effectiveness of improving learners 'reading competence. Fo?cused on the previewing skill, the first step of the reading instruction, a modified lesson plan is designed in the Chinese high school setting, followed by justification of the major elements of the plan, and some practical implications.

  18. United States Support Programme (USSP): Lessons Learned from the Management of Complex, Multi-Stakeholder Projects for International Safeguards

    International Nuclear Information System (INIS)

    Diaz, R.; Tackentien, J.

    2015-01-01

    This paper will review USSP experiences, lessons learned, and proposed future strategies on the management of complex projects including the Universal Non-Destructive Assay Data Acquisition Platform (UNAP) instrument development task. The focus will be on identifying lessons learned to formulate strategies to minimize risk and maximize the potential of commercial success for future complex projects. Topics planned for inclusion are: 1. Initial agreement amongst all stakeholders on the justification of the need of the development including market studies of existing/near term future COTS technology capabilities; 2. Initial confirmation that there is a market for the product other than the IAEA to reduce investment risk; 3. Agreement on an accelerated initial project schedule from request acceptance to commercial unit production including per unit cost and quantities; 4. During product development, obtaining periodic customer reaffirmation of the need and quantities for the product per the existing schedule and per unit price. (author)

  19. St. Louis FUSRAP Lessons Learned

    International Nuclear Information System (INIS)

    Eberlin, J.; Williams, D.; Mueller, D.

    2003-01-01

    The purpose of this paper is to present lessons learned from fours years' experience conducting Remedial Investigation and Remedial Action activities at the St. Louis Downtown Site (SLDS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Many FUSRAP sites are experiencing challenges conducting Remedial Actions within forecasted volume and budget estimates. The St. Louis FUSRAP lessons learned provide insight to options for cost effective remediation at FUSRAP sites. The lessons learned are focused on project planning (budget and schedule), investigation, design, and construction

  20. Collaborative Lesson Planning as Professional Development for Beginning Primary Teachers

    Science.gov (United States)

    Bauml, Michelle

    2014-01-01

    This qualitative case study describes how one beginning primary grade teacher benefited from collaborative lesson-planning meetings with her grade-level colleagues. The teacher accumulated knowledge of curriculum, pedagogy, and professional contexts as she participated in planning meetings each week during her first year of teaching. Furthermore,…

  1. Resources to Support Faculty Writing Data Management Plans: Lessons Learned from an Engineering Pilot

    Directory of Open Access Journals (Sweden)

    Natsuko H. Nicholls

    2014-07-01

    Full Text Available Recent years have seen a growing emphasis on the need for improved management of research data. Academic libraries have begun to articulate the conceptual foundations, roles, and responsibilities involved in data management planning and implementation. This paper provides an overview of the Engineering data support pilot at the University of Michigan Library as part of developing new data services and infrastructure. Through this pilot project, a team of librarians had an opportunity to identify areas where the library can play a role in assisting researchers with data management, and has put forth proposals for immediate steps that the library can take in this regard. The paper summarizes key findings from a faculty survey and discusses lessons learned from an analysis of data management plans from accepted NSF proposals. A key feature of this Engineering pilot project was to ensure that these study results will provide a foundation for librarians to educate and assist researchers with managing their data throughout the research lifecycle.

  2. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  3. Worldwide Overview of Lessons Learned from Decommissioning Projects

    International Nuclear Information System (INIS)

    Laraia, Michele

    2008-01-01

    With an increasing number of radioactive facilities and reactors now reaching the end of their useful life and being taken out of service, there is a growing emphasis worldwide on the safe and efficient decommissioning of such plants. There is a wealth of experience already gained in decommissioning projects for all kinds of nuclear facilities. It is now possible to compare and discuss progress and accomplishments worldwide. In particular, rather than on the factual descriptions of projects, technologies and case histories, it is important to focus on lessons learned: in this way, the return of experience is felt to effectively contribute to progress. Key issues - inevitably based on a subjective ranking - are presented in this paper. Through the exchange of lessons learned, it is possible to achieve full awareness of the need for resources for and constraints of safe and cost-effective decommissioning. What remains now is the identification of specific, remaining issues that may hinder or delay the smooth progress of decommissioning. To this end, lessons learned provide the necessary background information; this paper tries to make extensive use of practical experience gained by the international community

  4. Using Activity Theory to Examine How Teachers' Lesson Plans Meet Students' Learning Needs

    Science.gov (United States)

    Chizhik, Estella Williams; Chizhik, Alexander Williams

    2018-01-01

    How is lesson planning useful? This research study used Cultural Historical Activity Theory and intersubjectivity to answer this questions. This research explored to what extent teacher candidates' lesson plans (i.e., alignment among objectives, assessment, and instruction), and analyses of assessment data mediate their thinking about students'…

  5. Lessons learned from the NRU vessel leak repair and return to service projects

    International Nuclear Information System (INIS)

    Heeney, P.; Turcotte, J.

    2011-01-01

    In May 2009 the National Research Universal (NRU) reactor was shut down due to a small leak detected from the reactor vessel into the annulus surrounding the reactor. What ensued was a challenging, yet successful, 15 month long Repair and Return to Service Outage. This Repair and Return to Service Outage presented many first-of-a-kind challenges that provide learning opportunities which have been incorporated into subsequent planned outages. These lessons learned are invaluable tools to be used in the planning and execution of future outages. Following the repair of the NRU vessel, AECL was required to conduct annual inspections of the vessel wall. These inspections require an annual Extended Outage (up to 4 weeks in length). A planned Extended Outage was conducted in May/June 2011 and provided an opportunity to implement some of the lessons learned during the Repair and Return to Service Outage. Lessons learned from that Extended Outage have been incorporated in the subsequent monthly maintenance outages, with lessons learned sessions being held after each outage to ensure that the execution of outages is constantly improving. (author)

  6. LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)

    Energy Technology Data Exchange (ETDEWEB)

    Noonan, Christine F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Henry, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Corley, Courtney D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-01-14

    The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this document to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.

  7. SEL/Project Language. Level II, Kindergarten, Volume II (Lessons 17-32).

    Science.gov (United States)

    Valladares, Ann E.; And Others

    This curriculum guide contains the Southeastern Education Laboratory/Project Language Lessons 17-32 stressing listening, speaking, and reading readiness for disadvantaged kindergarten children. The lessons are designed to be used in the SEL's mobile preschool units or as readiness materials for kindergarten. The major emphasis of this intervention…

  8. The Fermilab ISDN Pilot Project: Experiences and future plans

    Energy Technology Data Exchange (ETDEWEB)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-12-31

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking.

  9. The Fermilab ISDN Pilot Project: Experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking

  10. The Fermilab ISDN pilot project: experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1996-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. each home was equipped with a basic rate ISDN (BRI) Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking. (author)

  11. Assessment of Understanding: Student Teachers' Preparation, Implementation and Reflection of a Lesson Plan for Science

    Science.gov (United States)

    Juhler, Martin Vogt

    2017-05-01

    Research finds that student teachers often fail to make observable instructional goals, without which a secure bridge between instruction and assessment is precluded. This is one reason that recent reports state that teacher education needs to become better at helping student teachers to develop their thinking about and skills in assessing pupils' learning. Currently in Europe, the Lesson Study method and the Content Representation tool, which both have a specific focus on assessment, have started to address this problem. This article describes and discusses an intervention in which Lesson Study was used in combination with Content Representation in student teachers' field practice. Empirical materials from one group of student teachers were analyzed to illustrate how the student teachers worked with assessment during the planning of a lesson, how they implemented it in a research lesson, and how they used the gathered observations to make claims about assessment aims. The findings suggest that the student teachers placed greater emphasis on assessment through the intervention. However, it is also found that more attention should have been dedicated to the planning phase and that the group did not manage to keep a research focus throughout the Lesson Study process. This suggests that it properly would be beneficial with several planning sessions prior to the research lesson, as well as having an expert teacher leading the Lesson Study.

  12. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  13. "1984": How Much Fact in Fiction? [Lesson Plan].

    Science.gov (United States)

    Hedberg, Betsy

    Based on George Orwell's novel "1984," this lesson plan presents activities designed to help students understand that the historical context of the novel is based on the mood and political climate of 1949 Europe; the society Orwell created and modern society in the United States have similarities and differences; and modern privacy issues and the…

  14. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    Science.gov (United States)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  15. The effectiveness of Concept Mapping Content Representation Lesson Study (ComCoReLS) model to improve skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher

    Science.gov (United States)

    Purwaningsih, E.; Suyatno; Wasis; Prahani, B. K.

    2018-03-01

    This research is aimed to analyse the effectiveness of ComCoReLS (Concept Mapping Content Representation Lesson Study) model towards the improvement skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher. This research used one group pre-test and post-test design on 12 pre-service physics teacher at University of Malang State (Indonesia) in academic year 2016/2017. Data collection was conducted through test and interview. Skills of creating physics lesson plan for pre-service physics teacher measurement were conducted through Physics Lesson Plan Evaluation Sheet (PLPES). The data analysis technique was done by using paired t-test and n-gain. The CoMCoReLS model consists of 5 phases, including (1) Preparation, (2) Coaching, (3) Guided Practice, (4) Independent Practice, and (5) Evaluation. In the first, second, third and fifth phases are done at University of Malang State, while the fourth phase (Independent Practice) is done in SMAN 1 Singosari, SMAN 2 Malang, SMA Lab UM, MAN 3 Malang. The results showed that there was a significant increase in skills of creating physics lesson plan for pre-service physics teacher at α = 5% and n-gain average of high category. Thus, the ComCoReLS model is effective for improving skills of creating physics lesson plan for pre-service physics teacher.

  16. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  17. General Mechanical Repair. Minor Automotive Maintenance, Small Engine [Repair, and] Welding: Curriculum Guide and Lesson Plans.

    Science.gov (United States)

    Hamlin, Larry

    This document contains a curriculum guide and lesson plans for a general mechanical repair course with three sections: minor automotive maintenance, small engine repair, and welding. The curriculum guide begins with a matrix that relates the lesson plans to essential elements of math, science, language arts, and social studies and to Texas…

  18. QA lessons learned for parameter control from the WIPP Project

    International Nuclear Information System (INIS)

    Richards, R.R.

    1998-01-01

    This paper provides a summary of lessons learned from experiences on the Waste Isolation Pilot Plant (WJPP) Project in implementation of quality assurance controls surrounding inputs for performance assessment analysis. Since the performance assessment (PA) process is inherent in compliance determination for any waste repository, these lessons-learned are intended to be useful to investigators, analysts, and Quality Assurance (QA) practitioners working on high level waste disposal projects. On the WIPP Project, PA analyses for regulatory-compliance determination utilized several inter-related computer programs (codes) that mathematically modeled phenomena such as radionuclide release, retardation, and transport. The input information for those codes are the parameters that are the subject of this paper. Parameters were maintained in a computer database, which was then queried electronically by the PA codes whenever input was needed as the analyses were run

  19. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    International Nuclear Information System (INIS)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-01-01

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment

  20. Bruce A restart (execution and lessons-learned)

    International Nuclear Information System (INIS)

    Soini, J.

    2011-01-01

    Lessons learned with the Bruce Units 3 and 4 restart have been incorporated into the current refurbishment of Units 1 and 2. In addition, lessons learned on the lead unit (U2) are aggressively applied on the lagging unit (U1) to maximize efficiency and productivity. There will be a discussion on how this internal OPEX, along with external lessons learned, are used to continuously improve all aspects of the Bruce A Restart project management cycle, from scope selection, through planning and scheduling, to execution.

  1. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  2. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  3. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  4. "Split" Character Studies in "Crime and Punishment." [Lesson Plan].

    Science.gov (United States)

    O'Brien, Mary

    Based on Fyodor Dostoevsky's novel "Crime and Punishment," this lesson plan presents activities designed to help students understand that: a close study of the characters of a literary classic will yield important clues to an understanding of the work as a whole; an effective analysis of stylistic devices depends upon selection and interpretation…

  5. Development of Lesson Plans and Student Worksheets Based Socio-Scientific Issues on Pollution Environmental Topic

    Science.gov (United States)

    Rahayu, S.; Meyliana, M.; Arlingga, A.; Reny, R.; Siahaan, P.; Hernani, H.

    2017-09-01

    The aim of this study is to develop lesson plans and student worksheets based socio-scientific issues on pollution environmental topic for seventh-grade junior high school students. Environmental pollution topic split into several subtopics namely air pollution, water pollution and soil pollution. The composing of lesson plans were developed based on socio-scientific issues with five stages, namely (1) Motivate; (2) Challenge; (3) Collect scientific evidence; (4) Analyse the evidence; (5) Build knowledge and make connections; and (6) Use evidence. While student worksheets contain articles on socio-scientific issues, practice, and there are a few questions to determine students’ reasoning. The method that is used in this research is research and development (R & D method). Development model used in this study is a model of Plomp that consists of four stages, namely: (1) Initial Research; (2) Design; (3) Realization or Construction; (4) Testing, evaluation and revision; (5) Implementation, while the research was limited to the fourth stage. Lesson plans and student worksheets based on socio-scientific issues was validated through an expert validation. The result showed that lesson plans and student worksheets based socio-scientific issues on pollution theme have a very decent and be able to apply in science classroom.

  6. Project scoping for lessons learnt to apply to the Celtic Seas marine sub-region

    OpenAIRE

    Twomey, Sarah; O'Mahony, Cathal

    2013-01-01

    This report involves a formal scoping exercise to identify lessons from a wide range of previous and current project and initiative experiences at the national, regional seas, European and global levels. An inventory of 77 projects and initiatives that are relevant with regard to the key activities proposed by the Celtic Seas Partnership has been compiled, as well as a short-list of 23 of the most pertinent projects, lessons learnt and contact names. This report has identified a number of syn...

  7. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  8. 49 Stories That Make an Ultimate STEM Lesson Plan

    Science.gov (United States)

    Mehta, Swati; Mehta, Rohit; Berzina-Pitcher, Inese; Seals, Christopher; Mishra, Punya

    2016-01-01

    In this paper we reviewed what 49 large urban public school district STEM teachers enrolled in a year-long graduate certificate and fellowship program at a large Midwestern university considered as their amazing teaching moments. They were asked to share their amazing teaching moments that would make an Ultimate Lesson Plan in STEM. In smaller…

  9. The Use of Lesson Study Combined with Content Representation in the Planning of Physics Lessons During Field Practice to Develop Pedagogical Content Knowledge

    Science.gov (United States)

    Juhler, Martin Vogt

    2016-08-01

    Recent research, both internationally and in Norway, has clearly expressed concerns about missing connections between subject-matter knowledge, pedagogical competence and real-life practice in schools. This study addresses this problem within the domain of field practice in teacher education, studying pre-service teachers' planning of a Physics lesson. Two means of intervention were introduced. The first was lesson study, which is a method for planning, carrying out and reflecting on a research lesson in detail with a learner and content-centered focus. This was used in combination with a second means, content representations, which is a systematic tool that connects overall teaching aims with pedagogical prompts. Changes in teaching were assessed through the construct of pedagogical content knowledge (PCK). A deductive coding analysis was carried out for this purpose. Transcripts of pre-service teachers' planning of a Physics lesson were coded into four main PCK categories, which were thereafter divided into 16 PCK sub-categories. The results showed that the intervention affected the pre-service teachers' potential to start developing PCK. First, they focused much more on categories concerning the learners. Second, they focused far more uniformly in all of the four main categories comprising PCK. Consequently, these differences could affect their potential to start developing PCK.

  10. Educating for Freedom and Responsibility: Lessons From the First Amendment Schools Project

    Science.gov (United States)

    Mitchell, Cynthia

    2016-01-01

    The First Amendment Schools project holds rich lessons in how to change school cultures into "laboratories of democracy"--as well as in how to increase the odds of success for any school reform effort. School reform programs of any sort need to make sure to build in sustainability, to provide ways to spread their lessons beyond the…

  11. A User's Guide to the Federal Theater Project.

    Science.gov (United States)

    Sheridan, Frank; Leslie, Linda

    1997-01-01

    Presents a lesson plan constructed around materials found in the User's Guide to the Federal Project. The Federal Theater Project produced radical and populist plays during the Great Depression before being de-funded by a conservative Congress. The lessons include activities and discussion built around the original plays. (MJP)

  12. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  13. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  14. Why does project planning fail

    International Nuclear Information System (INIS)

    Foley, M.; Luciano, G.

    1991-01-01

    The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's

  15. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  16. The Planning of Teaching in the Context of Lesson Study: Research Findings

    Science.gov (United States)

    Kanellopoulou, Eurydice-Maria; Darra, Maria

    2018-01-01

    The main purpose of the present study is to examine the attitudes, perceptions and experiences of the teachers participating in the planning of teaching in the context of the Lesson Study. The present work, which is part of a wider research effort, followed a mixed methodological planning for reasons of triangulation. The survey was conducted from…

  17. Supporting Pre-Service Teachers in Designing Technology-Infused Lesson Plans

    Science.gov (United States)

    Janssen, N.; Lazonder, A. W.

    2016-01-01

    The present study compared the effectiveness of two types of just-in-time support for lesson planning. Both types contained the same technological information but differed regarding pedagogical and content information. The first type presented this information separately (i.e., separate support); the second type presented this information in an…

  18. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  19. Lessons Learnt in the Development of Level 1 PUSPATI TRIGA Reactor Probability Safety Assessment: A Collaboration Project under the Norwegian Extra Budgetary Fund

    International Nuclear Information System (INIS)

    Mazleha Maskin; Tom, P.P.; Ahmad Hassan Sallehudin Mohd Sarif; Faizal Mohamed; Mohd Fazli Zakaria; Muhamad Puad Abu

    2014-01-01

    This article reports about the lessons learnt from the development of level 1 probabilistic safety assessment (PSA) project that was implemented under the IAEA mentoring program for TRIGA MARK II PUSPATI research reactor (RTP). As a project that involved more than 3 organizations, a strategic planning of the management and implementation of individual assignment is truly a hectic task. This report compiles all related activities from the forming of the Malaysian PSA team up to the final report submitted to the IAEA. (author)

  20. Lessons Learned and Flight Results from the F15 Intelligent Flight Control System Project

    Science.gov (United States)

    Bosworth, John

    2006-01-01

    A viewgraph presentation on the lessons learned and flight results from the F15 Intelligent Flight Control System (IFCS) project is shown. The topics include: 1) F-15 IFCS Project Goals; 2) Motivation; 3) IFCS Approach; 4) NASA F-15 #837 Aircraft Description; 5) Flight Envelope; 6) Limited Authority System; 7) NN Floating Limiter; 8) Flight Experiment; 9) Adaptation Goals; 10) Handling Qualities Performance Metric; 11) Project Phases; 12) Indirect Adaptive Control Architecture; 13) Indirect Adaptive Experience and Lessons Learned; 14) Gen II Direct Adaptive Control Architecture; 15) Current Status; 16) Effect of Canard Multiplier; 17) Simulated Canard Failure Stab Open Loop; 18) Canard Multiplier Effect Closed Loop Freq. Resp.; 19) Simulated Canard Failure Stab Open Loop with Adaptation; 20) Canard Multiplier Effect Closed Loop with Adaptation; 21) Gen 2 NN Wts from Simulation; 22) Direct Adaptive Experience and Lessons Learned; and 23) Conclusions

  1. Learning from Lessons: studying the structure and construction of mathematics teacher knowledge in Australia, China and Germany

    Science.gov (United States)

    Chan, Man Ching Esther; Clarke, David J.; Clarke, Doug M.; Roche, Anne; Cao, Yiming; Peter-Koop, Andrea

    2018-03-01

    The major premise of this project is that teachers learn from the act of teaching a lesson. Rather than asking "What must a teacher already know in order to practice effectively?", this project asks "What might a teacher learn through their activities in the classroom and how might this learning be optimised?" In this project, controlled conditions are created utilising purposefully designed and trialled lesson plans to investigate the process of teacher knowledge construction, with teacher selective attention proposed as a key mediating variable. In order to investigate teacher learning through classroom practice, the project addresses the following questions: To what classroom objects, actions and events do teachers attend and with what consequence for their learning? Do teachers in different countries attend to different classroom events and consequently derive different learning benefits from teaching a lesson? This international project combines focused case studies with an online survey of mathematics teachers' selective attention and consequent learning in Australia, China and Germany. Data include the teacher's adaptation of a pre-designed lesson, the teacher's actions during the lesson, the teacher's reflective thoughts about the lesson and, most importantly, the consequences for the planning and delivery of a second lesson. The combination of fine-grained, culturally situated case studies and large-scale online survey provides mutually informing benefits from each research approach. The research design, so constituted, offers the means to a new and scalable vision of teacher learning and its promotion.

  2. Lessons learned bulletin

    International Nuclear Information System (INIS)

    1994-05-01

    During the past four years, the Department of Energy -- Savannah River Operations Office and the Westinghouse Savannah River Company (WSRC) Environmental Restoration (ER) Program completed various activities ranging from waste site investigations to closure and post closure projects. Critiques for lessons learned regarding project activities are performed at the completion of each project milestone, and this critique interval allows for frequent recognition of lessons learned. In addition to project related lessons learned, ER also performs lessons learned critiques. T'he Savannah River Site (SRS) also obtains lessons learned information from general industry, commercial nuclear industry, naval nuclear programs, and other DOE sites within the complex. Procedures are approved to administer the lessons learned program, and a database is available to catalog applicable lessons learned regarding environmental remediation, restoration, and administrative activities. ER will continue to use this database as a source of information available to SRS personnel

  3. Figuring Somepin 'bout the Great Depression. Learning Page Lesson Plan.

    Science.gov (United States)

    McElroy, Amy; Pietsch, Chris

    These 10th and 11th grade lessons plans related to the Great Depression and the novel "The Grapes of Wrath" help students to: develop research skills and strategies, such as keyword searches, for finding information; recognize and use the different voices of migrants; and understand the politics of migration and the Great Depression. By…

  4. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  5. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  6. LEGO robot vehicle lesson plans for secondary education : a recruitment tool.

    Science.gov (United States)

    2012-08-01

    Robotics is a great way to get kids excited about science, technology, engineering, and math (STEM) topics. It is also highly effective in stimulation development of teamwork and self-confidence. This project provides transportation-related lesson pl...

  7. Development of a harmonized approach to safety assessment of decommissioning: Lessons learned from international experience (DeSa project)

    International Nuclear Information System (INIS)

    Percival, K.; Nokhamzon, J.-G.; Ferch, R.; Batandjieva, B.

    2006-01-01

    The number of nuclear facilities being or planned to be shutdown as they reach the end of their design life, due to accidents or other political and social factors has been increasing worldwide. This has led to an increase in the awareness of regulators and operators of the importance of development and implementation of adequate safety requirements and criteria for decommissioning of these facilities. A general requirement at international and national levels, even for new facilities to be commissioned, is the development of a decommissioning plan, which includes evaluation of potential radiological consequences to public and workers during planned and accidental decommissioning activities. Experience has been gained in the safety assessment of decommissioning at various sites with different complexities and hazard potentials. This experience shows that various approaches have been used in conducting safety assessments and that there is a need for harmonisation of these approaches and for transferring the good practice and lessons learned to other countries, in particular developing countries with limited financial and human resources. The IAEA launched an international project on Evaluation and Demonstration of Safety during Decommissioning (DeSa) in 2004 to provide a forum for exchange of lessons learned between site operators, regulators, safety assessors and other specialists in safety assessment of decommissioning of nuclear power plants, research reactors, laboratories, nuclear fuel cycle facilities, etc. This paper presents the lessons learned through the project up to date, i.e.; (i) a common approach to safety assessment is being applied worldwide with the following steps - establishment of assessment framework; description of the facility; definition of decommissioning activities; hazard identification and analysis; calculation of consequences; and analysis of results; (ii) a deterministic approach to safety assessment is most commonly applied; (iii) a

  8. The attitudinal and cognitive effects of interdisciplinary collaboration on elementary pre-service teachers development of biological science related lesson plans

    Science.gov (United States)

    Mills, Jada Jamerson

    There is a need for STEM (science, technology, engineering, and mathematics) education to be taught effectively in elementary schools. In order to achieve this, teacher preparation programs should graduate confident, content strong teachers to convey knowledge to elementary students. This study used interdisciplinary collaboration between the School of Education and the College of Liberal Arts through a Learning-by-Teaching method (LdL): Lernen durch Lernen in German. Pre-service teacher (PST) achievement levels of understanding science concepts based on pretest and posttest data, quality of lesson plans developed, and enjoyment of the class based on the collaboration with science students. The PSTs enrolled in two treatment sections of EDEL 404: Science in the Elementary Classroom collaborated with science students enrolled in BISC 327: Introductory Neuroscience to enhance their science skills and create case-based lesson plans on neurothology topics: echolocation, electrosensory reception, steroid hormones, and vocal learning. The PSTs enrolled in the single control section of EDEL 404 collaborated with fellow elementary education majors to develop lesson plans also based on the same selected topics. Qualitative interviews of education faculty, science faculty, and PSTs provided depth to the quantitative findings. Upon lesson plan completion, in-service teachers also graded the two best and two worst plans for the treatment and control sections and a science reviewer graded the plans for scientific accuracy. Statistical analyses were conducted for hypotheses, and one significant hypothesis found that PSTs who collaborated with science students had more positive science lesson plan writing attitudes than those who did not. Despite overall insignificant statistical analyses, all PSTs responded as more confident after collaboration. Additionally, interviews provided meaning and understanding to the insignificant statistical results as well as scientific accuracy of

  9. The Education and Lifestyle of the Chinese Literati. Lesson Plan.

    Science.gov (United States)

    Smithsonian Institution, Washington, DC. Arthur M. Sackler Gallery.

    This teaching package describes the education and lifestyle of the Chinese literati, popular from the Ming to the Qing dynasties (1368-1911). It consists of four lesson plans and a teacher's guide to a slide set. The latter illustrates painting formats popular during the late Ming period (1573-1644), hanging scrolls, handscrolls, the album leaf,…

  10. Planning lessons with learning platforms - problem and prospects for mathematics education

    DEFF Research Database (Denmark)

    Tamborg, Andreas Lindenskov

    2018-01-01

    is a key intention behind the implementation of the platform. It is also concluded that when the teachers succeed in using learning objectives actively in their planning, the objectives support the teachers in designing lessons that correspond with their intentions. The paper concludes with a discussion...

  11. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L., E-mail: m.freire.gormaly@utoronto.ca, E-mail: antonio.gittens@mail.utoronto.ca, E-mail: lavender.zhang@outlook.com [University of Toronto, Toronto, ON (Canada)

    2015-07-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  12. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    International Nuclear Information System (INIS)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L.

    2015-01-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  13. LESSONS LEARNED THROUGH OPTIMIZATION OF THE VOLUNTARY CORRECTIVE ACTION PROCESS

    International Nuclear Information System (INIS)

    Thacker, M. S.; Freshour, P.; McDonald, W.

    2002-01-01

    Valuable experience in environmental remediation was gained at Sandia National Laboratories/New Mexico (Sandia) by concurrently conducting Voluntary Corrective Actions (VCAs) at three Solid Waste Management Units (SWMUs). Sandia combined the planning, implementation, and reporting phases of three VCAs with the goal of realizing significant savings in both cost and schedule. The lessons learned through this process have been successfully implemented within the Sandia Environmental Restoration (ER) Project and could be utilized at other locations with multiple ER sites. All lessons learned resulted from successful teaming with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB), Sandia management, a Sandia risk assessment team, and Sandia waste management personnel. Specific lessons learned included the following: (1) potential efficiencies can be exploited by reprioritization and rescheduling of activities; (2) cost and schedule reductions can be realized by combining similar work at contiguous sites into a single effort; (3) working with regulators to develop preliminary remediation goals (PRGs) and gain regulatory acceptance for VCA planning prior to project initiation results in significant time savings throughout the remediation and permit modification processes; (4) effective and thoughtful contingency planning removes uncertainties and defrays costs so that projects can be completed without interruption; (5) timely collection of waste characterization samples allows efficient disposal of waste streams, and (6) concurrent reporting of VCA activities results in significant savings in time for the authors and reviewers

  14. Lessons Learned by Community Stakeholders in the Massachusetts Childhood Obesity Research Demonstration (MA-CORD) Project, 2013–2014

    Science.gov (United States)

    Ganter, Claudia; Aftosmes-Tobio, Alyssa; Chuang, Emmeline; Kwass, Jo-Ann; Land, Thomas

    2017-01-01

    Introduction Childhood obesity is a multifaceted disease that requires sustainable, multidimensional approaches that support change at the individual, community, and systems levels. The Massachusetts Childhood Obesity Research Demonstration project addressed this need by using clinical and public health evidence-based methods to prevent childhood obesity. To date, little information is known about successes and lessons learned from implementing such large-scale interventions. To address this gap, we examined perspectives of community stakeholders from various sectors on successes achieved and lessons learned during the implementation process. Methods We conducted 39 semistructured interviews with key stakeholders from 6 community sectors in 2 low-income communities from November 2013 through April 2014, during project implementation. Interviews were audio-recorded, transcribed, and analyzed by using the constant comparative method. Data were analyzed by using QSR NVivo 10. Results Successes included increased parental involvement in children’s health and education, increased connections within participating organizations and within the broader community, changes in organizational policies and environments to better support healthy living, and improvements in health behaviors in children, parents, and stakeholders. Lessons learned included the importance of obtaining administrative and leadership support, involving key stakeholders early in the program planning process, creating buffers that allow for unexpected changes, and establishing opportunities for regular communication within and across sectors. Conclusion Study findings indicate that multidisciplinary approaches support health behavior change and provide insight into key issues to consider in developing and implementing such approaches in low-income communities. PMID:28125400

  15. Reflective Lesson Planning in Refresher Training Programs for Experienced Physics Teachers.

    Science.gov (United States)

    Chung, C. M.; And Others

    1995-01-01

    Reports on a refresher training program that introduces experienced physics teachers to a reflective lesson-planning model and a more constructivist approach to physics teaching. Three instructional strategies developed by participants in the program and the corresponding suggestions made by their peers are presented and analyzed. (29 references)…

  16. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  17. A Text Mining Approach for Extracting Lessons Learned from Project Documentation: An Illustrative Case Study

    Directory of Open Access Journals (Sweden)

    Benjamin Matthies

    2017-12-01

    Full Text Available Lessons learned are important building blocks for continuous learning in project-based organisations. Nonetheless, the practical reality is that lessons learned are often not consistently reused for organisational learning. Two problems are commonly described in this context: the information overload and the lack of procedures and methods for the assessment and implementation of lessons learned. This paper addresses these problems, and appropriate solutions are combined in a systematic lesson learned process. Latent Dirichlet Allocation is presented to solve the first problem. Regarding the second problem, established risk management methods are adapted. The entire lessons learned process will be demonstrated in a practical case study

  18. Institutionalizing planning, enactment and reflection of daily lessons through appropriate organizational restructuring

    NARCIS (Netherlands)

    Raval, Harini; McKenney, Susan; Pieters, Julius Marie

    2011-01-01

    This study describes a professional development program aimed at supporting para-teachers in an Indian educational NGO to adopt learner-centered approaches. Organizational factors inhibiting para-teacher learning were modified. A routine of lesson planning before, and reflection after daily

  19. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  20. The Date That Lives in Infamy: Pearl Harbor Lesson Plans.

    Science.gov (United States)

    Department of the Navy, Washington, DC.

    This lesson plan can help teachers and students understand what happened on December 7, 1941, beginning with the first U.S. treaty with Japan in 1854 through the attacks in 1941. Students use primary sources to synthesize information and draw conclusions about the role of the U.S. Navy in foreign policy and to understand how people in 1941 reacted…

  1. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  2. The Global Polio Eradication Initiative: Progress, Lessons Learned, And Polio Legacy Transition Planning.

    Science.gov (United States)

    Cochi, Stephen L; Hegg, Lea; Kaur, Anjali; Pandak, Carol; Jafari, Hamid

    2016-02-01

    The world is closer than ever to achieving global polio eradication, with record-low polio cases in 2015 and the impending prospect of a polio-free Africa. Tens of millions of volunteers, social mobilizers, and health workers have participated in the Global Polio Eradication Initiative. The program contributes to efforts to deliver other health benefits, including health systems strengthening. As the initiative nears completion after more than twenty-five years, it becomes critical to document and transition the knowledge, lessons learned, assets, and infrastructure accumulated by the initiative to address other health goals and priorities. The primary goals of this process, known as polio legacy transition planning, are both to protect a polio-free world and to ensure that investments in polio eradication will contribute to other health goals after polio is completely eradicated. The initiative is engaged in an extensive transition process of consultations and planning at the global, regional, and country levels. A successful completion of this process will result in a well-planned and -managed conclusion of the initiative that will secure the global public good gained by ending one of the world's most devastating diseases and ensure that these investments provide public health benefits for years to come. Project HOPE—The People-to-People Health Foundation, Inc.

  3. Innovative Work Practices and Lessons Learned at the N Area Deactivation Project

    International Nuclear Information System (INIS)

    Day, R.S.

    1999-01-01

    This report identifies many of the lessons learned, innovations,and effective work practices that derived from activities supporting the N Area Deactivation Project at the U.S. Department of Energy's (DOE) Hanford Site. The work practices discussed in this report may be applicable and beneficial to similar projects throughout the DOE complex

  4. The role of project planning in project management

    OpenAIRE

    Klitsenko, A. I.; Клиценко, А. И.

    2013-01-01

    This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...

  5. Strategic Program Planning Lessons Learned in Developing the LTS S&T Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Duane Hanson; Brent Dixon; Gretchen Matthern

    2003-07-01

    Technology roadmapping is a strategic planning method used by companies to identify and plan the development of technologies necessary for new products. The U.S. Department of Energy’s Office of Environmental Management has used this same method to refine requirements and identify knowledge and tools needed for completion of defined missions. This paper describes the process of applying roadmapping to clarify mission requirements and identify enhancing technologies for the Long-Term Stewardship (LTS) of polluted sites after site cleanup has been completed. The nature of some contamination problems is such that full cleanup is not achievable with current technologies and some residual hazards remain. LTS maintains engineered contaminant barriers and land use restriction controls, and monitors residual contaminants until they no longer pose a risk to the public or the environment. Roadmapping was used to clarify the breadth of the LTS mission, to identify capability enhancements needed to improve mission effectiveness and efficiency, and to chart out the research and development efforts to provide those enhancements. This paper is a case study of the application of roadmapping for program planning and technical risk management. Differences between the planned and actual application of the roadmapping process are presented along with lessons learned. Both the process used and lessons learned should be of interest for anyone contemplating a similar technology based planning effort.

  6. The Construction and Pilot Application of a Scoring Rubric for Creative Drama Lesson Planning

    Science.gov (United States)

    Korkut, Perihan

    2018-01-01

    Instructional planning is an important part of successful teaching. Therefore, quality lesson planning is accepted as an important indicator of teacher knowledge and ability. This is no different for creative drama. Although drama is strongly rooted in the participating group's creativity and spontaneity, its success depends on a careful and…

  7. Supporting Elementary Education in-Service Teachers' Proficiency in Planning STEM-Centric Lessons

    Science.gov (United States)

    Bowers, Sharon W.

    The purpose of this study was to explore the McDaniel College Elementary STEM Instructional Leader (ESIL) pilot cohort's ability to proficiently plan lessons that incorporated the Maryland State STEM Standards of Practice (SOP), targeting integration of STEM content, inquiry learning, students' abilities to collaborate as a STEM team and students' strategic application of technology. Data collection, in the form of reviewing and analyzing study participants' lesson plans and self-reflections, was completed by three independent assessors. The researcher examined the interrater reliability among the three assessors using the Fleiss' kappa statistic. A 0.91 proportion of agreement consensus was documented among the three assessors. A test of hypothetical value was conducted using the nonparametric Wilcoxonsigned- rank Test. Interpretation of the Wilcoxon-signed-rank Test results suggest that the sample population demonstrated proficient planning abilities for the four targeted Maryland State STEM SOP. Findings from this research add to the field's knowledge of elements in the promotion of graduate coursework that leads to elementary in-service teachers' proficiency in planning STEM-centric lessons, however the findings also have broader implications for teacher education at large. The McDaniel College ESIL model could frame K-12 teacher education for both preservice and in-service teachers. The pragmatic, hybrid experience maximizes flexibility, promotes analytical thinking and self-reflection and builds communication skills. The introduction and development of inquiry and design-based learning through the 7E Learning Cycle develops the teachers' understanding of practices promoted not only within the Maryland State STEM SOP, but also within the Next Generation Science Standards. The McDaniel College ESIL model also builds upon the collective efforts of academia, a non-profit STEM research facility, and local school divisions to align efforts that may lead to

  8. Tobacco Use Prevention Education. K-12 Lesson Plans from the Montana Model Curriculum for Health Enhancement.

    Science.gov (United States)

    Montana State Office of Public Instruction, Helena.

    This publication presents K-12 tobacco use prevention lesson plans for schools in the state of Montana. Lessons for students in grades K-6 include: family connections; body tracing; smokeless tobacco; prenatal development; tobacco look-alikes; tobacco chemicals; analyzing tobacco and alcohol ads; tobacco use and the lungs; and a personal health…

  9. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, Michael E.; Brooks, Sheila M.; Miller, Joan M.; Mason, Robert A.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The liabilities include shutdown research and prototype power reactors, fuel handling facilities, radiochemical laboratories, support buildings, radioactive waste storage facilities, and contaminated lands at several sites located across eastern Canada from Quebec to Manitoba. The largest site, Chalk River Laboratories (CRL) in Ontario, will continue as an operational nuclear site for the foreseeable future. Planning and delivery of the Program is managed by the Liability Management Unit (LMU), a group that was formed within AECL for the purpose. The composition and progress of the NLLP has been reported in recent conferences. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites, and by various technical groups as suppliers to the LMU. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (which will conclude 2011 March), in planning the five-year second phase (which is currently being finalized), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Progress in executing the Program was slower than anticipated due to less than ideal alignment between some planned technical solutions and the actual requirements, as well as the

  10. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  11. Project Execution Plan, Rev. 3

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  12. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  13. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  14. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  15. Beyond the Playing Field: Jackie Robinson, Civil Rights Advocate. Lesson Plan.

    Science.gov (United States)

    National Archives and Records Administration, Washington, DC.

    This packet provides primary source documents and lesson plans relating to the study of Jackie Robinson as a civil rights advocate. The legendary baseball player, Jack Roosevelt Robinson, was the first black man to "officially" play in the big leagues in the 20th century. Jackie Robinson was not only a stellar baseball player, but he…

  16. Lessons Learned for Planning and Estimating Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  17. Experiences and lessons learned for planning and supply of micronutrient powders interventions

    Science.gov (United States)

    Schauer, Claudia; Sunley, Nigel; Nyhus Dhillon, Christina; Roca, Claudia; Tapia, Gustavo; Mathema, Pragya; Walton, Shelley; Situma, Ruth; Zlotkin, Stanley; DW Klemm, Rolf

    2017-01-01

    Abstract Realistic planning for a nutrition intervention is a critical component of implementation, yet effective approaches have been poorly documented. Under the auspices of “The Micronutrient Powders Consultation: Lessons Learned for Operational Guidance,” 3 working groups were formed to summarize experiences and lessons across countries regarding micronutrient powders (MNP) interventions for young children. This paper focuses on programmatic experiences in the planning stages of an MNP intervention, encompassing assessment, enabling environment and adaptation, as well as considerations for supply. Methods included a review of published and grey literature, key informant interviews, and deliberations throughout the consultation process. We found that assessments helped justify adopting an MNP intervention, but these assessments were often limited by their narrow scope and inadequate data. Establishing coordinating bodies and integrating MNP into existing policies and programmes have helped foster an enabling environment and support programme stability. Formative research and pilots have been used to adapt MNP interventions to specific contexts, but they have been insufficient to inform scale‐up. In terms of supply, most countries have opted to procure MNP through international suppliers, but this still requires understanding and navigating the local regulatory environment at the earliest stages of an intervention. Overall, these findings indicate that although some key planning and supply activities are generally undertaken, improvements are needed to plan for effective scale‐up. Much still needs to be learned on MNP planning, and we propose a set of research questions that require further investigation. PMID:28960875

  18. Breaking the deadlock: lessons from cross-border spatial projects in Flanders and the Netherlands

    NARCIS (Netherlands)

    de Vries, J.

    2008-01-01

    This paper explores the specific characteristics of decision-making in cross-border spatial projects and draws some lessons for European territorial cooperation. This is done by examining three major infrastructure projects between the Netherlands and Flanders: the construction of a high-speed rail

  19. Project Specific Quality Assurance Plan

    International Nuclear Information System (INIS)

    Pedersen, K.S.

    1995-01-01

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291

  20. Mars Rover Model Celebration: Developing Inquiry Based Lesson Plans to Teach Planetary Science In Elementary And Middle School

    Science.gov (United States)

    Bering, E. A.; Slagle, E.; Nieser, K.; Carlson, C.; Kapral, A.; Dominey, W.; Ramsey, J.; Konstantinidis, I.; James, J.; Sweaney, S.; Mendez, R.

    2012-12-01

    The recent NASA Mars Rover missions capture the imagination of children, as NASA missions have done for decades. The University of Houston is in the process of developing a prototype of a flexible program that offers children an in-depth educational experience culminating in the design and construction of their own model rover. The existing prototype program is called the Mars Rover Model Celebration. It focuses on students, teachers and parents in grades 3-8. Students will design and build a model of a Mars rover to carry out a student selected science mission on the surface of Mars. The model will be a mock-up, constructed at a minimal cost from art supplies. The students will build the models as part of a project on Mars. The students will be given design criteria for a rover and will do basic research on Mars that will determine the objectives and features of their rover. This project may be used either informally as an after school club or youth group activity or formally as part of a class studying general science, earth science, solar system astronomy or robotics, or as a multi-disciplinary unit for a gifted and talented program. The project's unique strength lies in engaging students in the process of spacecraft design and interesting them in aerospace engineering careers. The project is aimed at elementary and secondary education. Not only will these students learn about scientific fields relevant to the mission (space science, physics, geology, robotics, and more), they will gain an appreciation for how this knowledge is used to tackle complex problems. The low cost of the event makes it an ideal enrichment vehicle for low income schools. It provides activities that provide professional development to educators, curricular support resources using NASA Science Mission Directorate (SMD) content, and provides family opportunities for involvement in K-12 student learning. This paper will describe the development of a detailed set of new 5E lesson plans to

  1. Science and Math Lesson Plans to Meet the Ohio Revised Science Standards and the Next Generation of Standards for Today; Technology (Excel

    Directory of Open Access Journals (Sweden)

    Suzanne Lunsford

    2015-02-01

    Full Text Available Pre-service teachers (K-12 developed and taught lesson plans that met the state and national science and technology standards by integrating Excel and PowerPoint into their lesson. A sample of 74 pre-service teachers in our science education program were required to integrate technology (Excel as they developed science and math lesson plans with graphing as a requirement. These students took pre-test and post-test (n=74 to determine their understanding of Excel in relation to the need of current technology for todays' science classroom. The test results showed that students obtained content gains in Excel graphing in all the inquiry-based lab experiments. They also gained experience in developing math skills, inquiry-based science lesson plans, and communication and presentation skills.

  2. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  3. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  4. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  5. Lesson Plans for "Not for Ourselves Alone: The Story of Elizabeth Cady Stanton and Susan B. Anthony."

    Science.gov (United States)

    Prososki, Lisa; Krouse, Judith; Harper, Judith E.

    These lesson plans for high school students were developed to accompany the documentary film by Ken Burns and Paul Barnes which tells the story of Elizabeth Cady Stanton and Susan B. Anthony and their lifelong fight for women's rights. In the lessons students write editorials about women's rights around the world today, interview senior citizens…

  6. Provider-Sponsored Health Plans: Lessons Learned over Three Decades.

    Science.gov (United States)

    Breon, Richard C

    2016-01-01

    Healthcare's movement to value-based care is causing health systems across the country to consider whether owning or partnering with a health plan could benefit their organizations. Although organizations have different reasons for wanting to enter the insurance business, potential benefits include improving care quality, lowering costs, managing population health, expanding geographic reach, and diversifying the organization's revenue stream. However, the challenges and risks of owning a health plan are formidable: Assuming 100 percent financial risk for a patient population requires considerable financial resources, as well as competencies that are wholly different from those needed to run a hospital or physician group. For Spectrum Health, an integrated, not-for-profit health system based in Grand Rapids, Michigan, owning a health plan has been vital to fulfilling its mission of improving the health of the communities it serves, as well as its value proposition of providing highquality care at lower costs. This article weighs the pros and cons of operating a health plan; explores key business factors and required competencies that organizations need to consider when deciding whether to buy, build, or partner; examines the current environment for provider-sponsored health plans; and shares some of the lessons Spectrum Health has learned over three decades of running its health plan, Priority Health.

  7. "The State of Chihuahua", Lesson Plan for "Cultural Unit: Focus on Mexico."

    Science.gov (United States)

    Llewellyn, Marianne

    This lesson plan was designed for students in Montana schools. The objectives for this culture unit are having: (1) students recognize the similarities between their home stat of Montana and the Mexican state of Chihuahua; (2) students learn about features unique to Chihuahua; and (3) students create an advertising brochure marketing Chihuahua to…

  8. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  9. Chemical and nuclear emergencies: Interchanging lessons learned from planning and accident experience

    International Nuclear Information System (INIS)

    Adler, V.; Sorensen, J.H.; Rogers, G.O.

    1989-01-01

    Because the goal of emergency preparedness for both chemical and nuclear hazards is to reduce human exposure to hazardous materials, this paper examines the interchange of lessons learned from emergency planning and accident experience in both industries. While the concerns are slightly different, sufficient similarity is found for each to draw implications from the others experience. Principally the chemical industry can learn from the dominant planning experience associated with nuclear power plants, while the nuclear industry can chiefly learn from the chemical industry's accident experience. 23 refs

  10. Designing a lessons learned model to improve the success of new product development in project oriented organizations

    Directory of Open Access Journals (Sweden)

    Ahmad

    2016-12-01

    Full Text Available Nowadays, project-based organizations need to utilize intellectual capital and knowledge to become leader in their business activities. The new approach to use knowledge based skills from one side and development of the new complicated products from the other side have increased the need for designing a lessons learned model. The purpose of this paper is to design a lessons learned model to improve the success of new product development for project oriented organizations. The study designs a questionnaire in Likert scale and distributes it among 56 experts who were well informed about various techniques of new product development and lessons learned. Cronbach alphas for all components of the survey were well above the desirable level. The results of the survey have indicated that there were positive and meaningful relationships between lessons learned components and the success of the new product development.

  11. Inadequacies of Belgium nuclear emergency plans: lessons from the Fukushima catastrophe have not been learned

    International Nuclear Information System (INIS)

    Boilley, David; Josset, Mylene

    2015-01-01

    After having outlined that some Belgium regional authorities made some statements showing that they did not learn lessons neither from the Chernobyl catastrophe, nor from the Fukushima accident, this report aims at examining whether Belgium is well prepared to face a severe nuclear accident occurring within its borders or in neighbouring countries, whether all hypotheses have actually been taken into account, and whether existing emergency plans are realistic. After a presentation of Belgium's situation regarding nuclear plants (Belgium plants and neighbouring French plants), the report presents the content and organisation of the nuclear emergency plan for the Belgium territory at the national, provincial and municipal levels. While outlining inadequacies and weaknesses of the Belgium plan regarding the addressed issues, it discusses the main lessons learned from the Fukushima accident in terms of emergency planning areas, of population sheltering, of iodine-based prophylaxis, of population evacuation, of food supply, of tools (measurement instruments) and human resources, and of public information. In the next parts, the report addresses and discusses trans-border issues, and the commitment of stakeholders

  12. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  13. Research Planning and Evaluation Project

    International Nuclear Information System (INIS)

    Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon

    2011-12-01

    - To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required

  14. Boosting innovation in the water sector--the role and lessons learned from collaborative projects.

    Science.gov (United States)

    Alegre, H; Coelho, S T; Feliciano, J F; Matos, R

    2015-01-01

    A key worldwide challenge in most sectors is to boost the effective adoption of innovation, as underpinned by the new European Union research programme Horizon 2020, which focuses on increasing innovation in Europe from 2014 to 2020. This is particularly relevant in the water sector, often perceived as conservative and averse to change. This paper discusses the role that collaborative knowledge-transfer projects can play in effectively rolling out R&D in the water industry. LNEC (Laboratório Nacional de Engenharia Civil) has designed a structured model based on a phased programme and a network of utilities and researchers. The paper presents the core principles, the rationale, the model and methods used, and the theoretical background, as well as the project's impact, outcomes and products. The discussion highlights the lessons learnt and provides a formal analysis of the advantages of focusing on middle management as an effective entry point, even if innovation is needed across the organization. Making training materials, guidelines, use cases, data and software publicly available after the project's end has proven to have a decisive multiplying effect. The paper also argues in favour of the collaborative model as a basis for R&D sustainability, and details on-going and planned developments.

  15. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  16. Lessons learned: Managing the development of a corporate Ada training project

    Science.gov (United States)

    Blackmon, Linda F.

    1986-01-01

    The management lessons learned during the implementation of a corporate mandate to develop and deliver an effective Ada training program to all divisions are discussed. The management process involved in obtaining cooperation from all levels in the development of a corporate-wide project is described. The problem areas are identified along with some possible solutions.

  17. Incorporating the Six Core Elements of Health Care Transition Into a Medicaid Managed Care Plan: Lessons Learned From a Pilot Project.

    Science.gov (United States)

    McManus, Margaret; White, Patience; Pirtle, Robin; Hancock, Catina; Ablan, Michael; Corona-Parra, Raquel

    2015-01-01

    This pediatric-to-adult health care transition pilot project describes the process and results of incorporating the "Six Core Elements of Health Care Transition (2.0)" into a Medicaid managed care plan with a group of 35 18-23 year olds who have chronic mental health, developmental, and complex medical conditions. The pilot project demonstrated an effective approach for customizing and delivering recommended transition services. At the start of the 18-month project, the Medicaid plan was at the basic level (1) of transition implementation of the Six Core Elements with no transition policy, member transition readiness assessment results, health care transition plans of care, updated medical summaries, transfer package for the adult-focused provider, and assurance of transfer completion and consumer feedback. At the conclusion of the pilot project, the plan scored at level 3 on each core element. The primary reason for not scoring at the highest level (4) was because the transition elements have not been incorporated into services for all enrollees within the plan. Future efforts in managed care will benefit from starting the transition process much earlier (ages 12-14), expanding the role of nurse care managers and participating pediatric and adult-focused clinicians in transition, and offering payment incentives to clinicians to implement the Six Core Elements of Health Care Transition. Copyright © 2015 Elsevier Inc. All rights reserved.

  18. Learning with and about Advertising in Chemistry Education with a Lesson Plan on Natural Cosmetics--A Case Study

    Science.gov (United States)

    Belova, Nadja; Eilks, Ingo

    2015-01-01

    This paper describes a case study on the chemistry behind natural cosmetics in five chemistry learning groups (grades 7-11, age range 13-17) in a German comprehensive school. The lesson plan intends to promote critical media literacy in the chemistry classroom and specifically emphasizes learning with and about advertising. The lessons of four…

  19. SNF Project Engineering Process Improvement Plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    2000-01-01

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities

  20. The SNL/NM Classified Waste Landfill Excavation: Lessons Learned Moving from Planning to Implementation

    International Nuclear Information System (INIS)

    Galloway, Robert B; Slavin, Paula

    1999-01-01

    recycling of classified components, along with the associated costs and infrastmcture. Very stringent radiological controls were imposed on site operations during the planning phase. Radiological controls that are not justified significantly impact the efficiency and cost of operations. If the initial approach is too conservative, there should be well-defined provisions for scaling down the protective measures to reflect the actual risks. Once the effectiveness of early detection, monitoring, and surveys is proven, radiological controls and postings should be re-evaluated to verify that they are appropriate. High levels of heavy metals dust were not anticipated during the planning phase but were suspected, then confirmed, during material handling. Respiratory protection and monitoring were upgraded accordingly and the costs added to the baseline. In contrast to radiological constraints, industrial hygiene guidelines were worked into the process with a minimum of adverse impact. While a lot of unforeseen expenses occur, some expected costs can be reduced. During the planning phase, the anticipated need to adequately characterize a variety of radionuclides in soil led to using Large Area Gamma Spectroscopy (LAGS) to survey all the soil excavated. About a quarter of the way through the project, it was obvious that very little radioactive material was present in the excavated soils. Since all the soil is processed through a screen plant, producing a fairly homogeneous mix, a more common method of sampling soil piles was implemented to replace the LAGS unit, increase productivity, and reduce costs. In summary, the most important lesson is to expect and be ready to change. Excavating a landfill requires the flexibility to quickly adjust processes to handle the unknown variables, and close attention to detail so all the different facets of the project are kept under control

  1. 14 CFR 152.109 - Project eligibility: Airport planning.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport planning. 152....109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport master planning is not approved unless— (1) The location of the existing or proposed airport is included...

  2. Literacy Models and the Reconstruction of History Education: A Comparative Discourse Analysis of Two Lesson Plans

    Science.gov (United States)

    Collin, Ross; Reich, Gabriel A.

    2015-01-01

    This article presents discourse analyses of two lesson plans designed for secondary school history classes. Although the plans focus on the same topic, they rely on different models of content area literacy: disciplinary literacy, or reading and writing like experts in a given domain, and critical literacy, or reading and writing to address…

  3. Route planning algorithms: Planific@ Project

    Directory of Open Access Journals (Sweden)

    Gonzalo Martín Ortega

    2009-12-01

    Full Text Available Planific@ is a route planning project for the city of Madrid (Spain. Its main aim is to develop an intelligence system capable of routing people from one place in the city to any other using the public transport. In order to do this, it is necessary to take into account such things as: time, traffic, user preferences, etc. Before beginning to design the project is necessary to make a comprehensive study of the variety of main known route planning algorithms suitable to be used in this project.

  4. Criteria for Developing a Successful Privatization Project

    Science.gov (United States)

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  5. Steam generator replacement at Bruce A: approach, results, and lessons learned

    International Nuclear Information System (INIS)

    Tomkiewicz, W.; Savage, B.; Smith, J.

    2008-01-01

    Steam Generator Replacement is now complete in Bruce A Units 1 and 2. In each reactor, eight steam generators were replaced; these were the first CANDU steam generator replacements performed anywhere in the world. The plans for replacement were developed in 2004 and 2005, and were summarized in an earlier paper for the CNS Conference held in November, 2006. The present paper briefly summarizes the methodologies and special processes used such as metrology, cutting and welding and heavy lifting. The paper provides an update since the earlier report and focuses on the project achievements to date, such as: - A combination of engineered methodology, laser metrology and precise remote machining led to accurate first time fit-ups of each new replacement steam generator and steam drums - Lessons learned in the first unit led to schedule improvements in the second unit - Dose received was lowest recorded for any steam generator replacement project. The experience gained and lessons learned from Units 1 and 2 will be valuable in planning and executing future replacement steam generator projects. A video was presented

  6. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  7. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  8. Oskarshamn 1-project FENIX

    International Nuclear Information System (INIS)

    Sjoeqvist, N.G.

    1994-01-01

    This paper summarizes the actions to be taken in a large re-start and backfitting project such as the Fenix project. It describes the organization, planning and financial management, safety criteria and licensing procedures, safety concept report, health and safety. The results from the unique full system decontamination of the reactor pressure vessel is described. The project is still ongoing and therefore other results and lessons learnt are not reported. (author) 9 figs

  9. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  10. Cost-effective facility disposition planning with safety and health lessons learned and good practices from the Oak Ridge Decontamination and Decommissioning Program

    International Nuclear Information System (INIS)

    1998-05-01

    An emphasis on transition and safe disposition of DOE excess facilities has brought about significant challenges to managing worker, public, and environmental risks. The transition and disposition activities involve a diverse range of hazardous facilities that are old, poorly maintained, and contain radioactive and hazardous substances, the extent of which may be unknown. In addition, many excess facilities do not have historical facility documents such as operating records, plant and instrumentation diagrams, and incident records. The purpose of this report is to present an overview of the Oak Ridge Decontamination and Decommissioning (D and D) Program, its safety performance, and associated safety and health lessons learned and good practices. Illustrative examples of these lessons learned and good practices are also provided. The primary focus of this report is on the safety and health activities and implications associated with the planning phase of Oak Ridge facility disposition projects. Section 1.0 of this report provides the background and purpose of the report. Section 2.0 presents an overview of the facility disposition activities from which the lessons learned and good practices discussed in Section 3.0 were derived

  11. Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

    Energy Technology Data Exchange (ETDEWEB)

    Callahan, M.; Anderson, K.; Booth, S.; Katz, J.; Tetreault, T.

    2011-09-01

    Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

  12. Health Care Consumerism: Lessons My 401(k) Plan Taught Me.

    Science.gov (United States)

    Steinberg, Allen T

    2015-01-01

    Changes to the U.S. health care system are here. As we think about how individuals will pay for health care--while actively employed and while retired--our experiences with 401(k) plans provide some valuable lessons. In order to support employees in this new health care world--a challenge arguably more daunting than the 401(k) challenge we faced 20 years ago--some very different types of support are needed. Employers should consider providing their employees with the resources to manage health care changes.

  13. Detroit Works Long-Term Planning Project: Engagement Strategies for Blending Community and Technical Expertise

    Directory of Open Access Journals (Sweden)

    Toni L. Griffin

    2014-10-01

    Full Text Available In January 2013, civic leaders, community stakeholders, and residents came together to release Detroit Future City: 2012 Detroit Strategic Framework Plan, a guiding blueprint for transforming Detroit from its current state of population loss and excessive vacancy into a model for the reinvention of post-industrial American cities. Three years prior, the U.S. Census had reported that the city had lost 24% of its population over the last decade and had experienced a 20% increase in vacant and abandoned property, bringing total vacancy to roughly the size of Manhattan. In addition to physical and economic challenges, Detroiters had also acknowledged significant barriers to effective civic engagement. Foremost among these barriers were a profound sense of immobilization, planning fatigue, and a general perception of cynicism about planning and engagement efforts. These challenges were compounded by historic racial dynamics and tension. This case study elaborates on the comprehensive and innovative civic engagement executed in a citywide planning process called the Detroit Works Project, which took place from late 2010 through late 2012. For the citywide planning process to be successful and sustainable, civic leaders and project funders committed to a planning initiative that would be different from previous efforts, in large part because the “owners” of the process would be diverse and inclusive across all community sectors. The case study, written by three of the key consultants from the project, describes four key civic engagement strategies deployed in the creation of the strategic framework: (1 addressing profound challenges of culture, race, and politics by deliberately building trust; (2 elevating community expertise by fostering a sense of ownership of the process; (3 blending technical and community expertise; and (4 viewing civic engagement as an ongoing two-way conversation rather than a series of large-scale episodic events. This

  14. Experience in Use of Project Method during Technology Lessons in Secondary Schools of the USA

    Science.gov (United States)

    Sheludko, Inna

    2015-01-01

    The article examines the opportunities and prospects for the use of experience of project method during "technology lessons" in US secondary schools, since the value of project technology implementation experience into the educational process in the USA for ensuring holistic development of children, preparing them for adult life, in…

  15. Designing Innovative Lessons Plans to Support the Next Generation Science Standards (NGSS)

    Science.gov (United States)

    Passow, M. J.

    2013-12-01

    The Next Generation Science Standards (NGSS) issued earlier in 2013 provide the opportunity to enhance pre-college curricula through a new focus on the ';Big Ideas' in Science, more attention to reading and writing skills needed for college and career readiness, and incorporation of engineering and technology. We introduce a set of lesson plans about scientific ocean drilling which can serve as a exemplars for developing curricula to meet NGSS approaches. Designed for middle and high school students, these can also be utilized in undergraduate courses. Development of these lessons was supported through a grant from the Deep Earth Academy of the Consortium for Ocean Leadership. They will be disseminated through websites of the Deep Earth Academy (http://www.oceanleadership.org/education/deep-earth-academy/) and Earth2Class Workshops for Teachers (http://www.earth2class.org), as well as through workshops at science education conferences sponsored by the National Earth Science Teachers Association (www.nestanet.org) and other organizations. Topics include 'Downhole Logging,' 'Age of the Ocean Floors,' 'Tales of the Resolution,' and 'Continental Shelf Sediments and Climate Change Patterns.' 'Downhole Logging' focuses on the engineering and technology utilized to obtain more information about sediments and rocks cored by the JOIDES Resolution scientific drilling vessel. 'Age of the Ocean Floor' incorporates the GeoMap App visualization tools (http://www.geomapapp.org/) to compare sea bottom materials in various parts of the world. 'Tales of the Resolution' is a series of ';graphic novels' created to describe the scientific discoveries, refitting of the JOIDES Resolution, and variety of careers available in the marine sciences (http://www.ldeo.columbia.edu/BRG/outreach/media/tales/). The fourth lesson focuses on discoveries made during Integrated Ocean Drilling Program Expedition 313, which investigated patterns in the sediments beneath the continental shelf off New

  16. 78 FR 54949 - Major Project Financial Plan Guidance

    Science.gov (United States)

    2013-09-06

    ...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...

  17. From resilience thinking to Resilience Planning: Lessons from practice.

    Science.gov (United States)

    Sellberg, M M; Ryan, P; Borgström, S T; Norström, A V; Peterson, G D

    2018-07-01

    Resilience thinking has frequently been proposed as an alternative to conventional natural resource management, but there are few studies of its applications in real-world settings. To address this gap, we synthesized experiences from practitioners that have applied a resilience thinking approach to strategic planning, called Resilience Planning, in regional natural resource management organizations in Australia. This case represents one of the most extensive and long-term applications of resilience thinking in the world today. We conducted semi-structured interviews with Resilience Planning practitioners from nine organizations and reviewed strategic planning documents to investigate: 1) the key contributions of the approach to their existing strategic planning, and 2) what enabled and hindered the practitioners in applying and embedding the new approach in their organizations. Our results reveal that Resilience Planning contributed to developing a social-ecological systems perspective, more adaptive and collaborative approaches to planning, and that it clarified management goals of desirable resource conditions. Applying Resilience Planning required translating resilience thinking to practice in each unique circumstance, while simultaneously creating support among staff, and engaging external actors. Embedding Resilience Planning within organizations implied starting and maintaining longer-term change processes that required sustained multi-level organizational support. We conclude by identifying four lessons for successfully applying and embedding resilience practice in an organization: 1) to connect internal "entrepreneurs" to "interpreters" and "networkers" who work across organizations, 2) to assess the opportunity context for resilience practice, 3) to ensure that resilience practice is a learning process that engages internal and external actors, and 4) to develop reflective strategies for managing complexity and uncertainty. Copyright © 2018 The Authors

  18. Culturally Responsive Education: Developing Lesson Plans for Vietnamese Students in the American Diaspora

    Science.gov (United States)

    Douglas, Cynthia M.

    2015-01-01

    This article focuses on the application of the philosophical principles of John Dewey and Culturally Responsive Education in the creation of lesson plans for Vietnamese students in the American Diaspora. Through a Fulbright-Hayes Program a group of teachers from the New York City Public School System and Long Island spent six weeks in Vietnam…

  19. Organisational development in general practice: lessons from practice and professional development plans (PPDPs

    Directory of Open Access Journals (Sweden)

    Hocking Paul

    2000-12-01

    Full Text Available Abstract Background Improving the quality and effectiveness of clinical practice is becoming a key task within all health services. Primary medical care, as organised in the UK is composed of clinicians who work in independent partnerships (general practices that collaborate with other health care professionals. Although many practices have successfully introduced innovations, there are no organisational development structures in place that support the evolution of primary medical care towards integrated care processes. Providing incentives for attendance at passive educational events and promoting 'teamwork' without first identifying organisational priorities are interventions that have proved to be ineffective at changing clinical processes. A practice and professional development plan feasibility study was evaluated in Wales and provided the experiential basis for a summary of the lessons learnt on how best to guide organisational development systems for primary medical care. Results Practice and professional development plans are hybrids produced by the combination of ideas from management (the applied behavioural science of organisational development and education (self-directed adult learning theories and, in conceptual terms, address the lack of effectiveness of passive educational strategies by making interventions relevant to identified system wide needs. In the intervention, each practice participated in a series of multidisciplinary workshops (minimum 4 where the process outcome was the production of a practice development plan and a set of personal portfolios, and the final outcome was a realised organisational change. It was apparent during the project that organisational admission to a process of developmental planning needed to be a stepwise process, where initial interest can lead to a fuller understanding, which subsequently develops into motivation and ownership, sufficient to complete the exercise. The advantages of

  20. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  1. [Managing digital medical imaging projects in healthcare services: lessons learned].

    Science.gov (United States)

    Rojas de la Escalera, D

    2013-01-01

    Medical imaging is one of the most important diagnostic instruments in clinical practice. The technological development of digital medical imaging has enabled healthcare services to undertake large scale projects that require the participation and collaboration of many professionals of varied backgrounds and interests as well as substantial investments in infrastructures. Rather than focusing on systems for dealing with digital medical images, this article deals with the management of projects for implementing these systems, reviewing various organizational, technological, and human factors that are critical to ensure the success of these projects and to guarantee the compatibility and integration of digital medical imaging systems with other health information systems. To this end, the author relates several lessons learned from a review of the literature and the author's own experience in the technical coordination of digital medical imaging projects. Copyright © 2012 SERAM. Published by Elsevier Espana. All rights reserved.

  2. Planning Complex Projects Automatically

    Science.gov (United States)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  3. A Relevant Lesson: Hitler Goes to the Mall

    Science.gov (United States)

    Gerwin, David

    2003-01-01

    A "Motivation" eliciting the "Aim" of each lesson initiates each lesson in the orthodox "developmental lesson-plan" that has dominated classroom instruction in NYC public schools for at least the past half-century. An action-research study of 38 lesson-plans (over 5 each from 5 teachers) drawn from student-teaching…

  4. Creating more effective health plan quality reports for consumers: lessons from a synthesis of qualitative testing.

    Science.gov (United States)

    Harris-Kojetin, L D; McCormack, L A; Jaël, E F; Sangl, J A; Garfinkel, S A

    2001-07-01

    Social marketing techniques such as consumer testing have only recently been applied to develop effective consumer health insurance information. This article discusses lessons learned from consumer testing to create consumer plan choice materials. Data were collected from 268 publicly and privately insured consumers in three studies between 1994 and 1999. Iterative testing and revisions were conducted to design seven booklets to help Medicaid, Medicare, and employed consumers choose a health plan. Standardized protocols were used in 11 focus groups and 182 interviews to examine the content, comprehension, navigation, and utility of the booklets. A method is suggested to help consumers narrow their plan choices by breaking down the process into smaller decisions using a set of guided worksheets. Implementing these lessons is challenging and not often done well. This article gives examples of evidence-based approaches to address cognitive barriers that designers of consumer health insurance information can adapt to their needs.

  5. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  6. Recertification Project Plan

    International Nuclear Information System (INIS)

    2001-01-01

    The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if

  7. Lessons learned in wake of WPPSS

    International Nuclear Information System (INIS)

    Koenen, A.V.; Gillespie, J.W.

    1984-01-01

    Several fundamentals of public power financial management have become more critical in the wake of the Washington Public Power Supply System (WPPSS) default: the human and financial costs of trying to resolve problems of this complexity after they occur will require an almost unimaginable amount of time and money that could be productively employed elsewhere; the economic feasibility of the project is paramount, and is far more important than its legal security or its attractiveness to utility managers; the ratepayers' ability and willingness to pay is the key security in public power financing; management performance, not promises, will be the measure of the post WPPSS marketplace; financial flexibility is crucial. Using these lessons, the author outlines a five-step program of strategic planning for planning and managing long-term projects

  8. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  9. Project Plan For Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation

  10. Energy efficiency and renewable energies: first lessons learned from AFD and FFEM funding

    International Nuclear Information System (INIS)

    Ries, Alain; Dubus, Koulm; Naudet, Jean David

    2008-04-01

    The French Agency for Development (AFD) has been always more involved in projects dealing with issues related to global warming, and more particularly in projects aiming at developing energy efficiency and renewable energies, these projects involved different expertises (energy, urban planning, transports, agriculture, and so on). In order to highlight lessons learned from these diversity of projects and interventions, this report first proposes an analysis of these projects related to energy efficiency and renewable energies in terms of concerned sectors, of intervener, of funding type, and of evolution in time. Then, the authors highlight lessons learned in terms of project starting conditions (national framework, funding, technical abilities, social and environmental factors), in terms of funding conditions for these projects (concessional financing, specialised credit lines), and in terms of climatic impact assessment and of criteria of project selection (practices and reductions of greenhouse gas emissions, improvement of the climatic impact for project financed by the AFD)

  11. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  12. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  13. Getting to Gender Equality in Energy Infrastructure : Lessons from Electricity Generation, Transmission, and Distribution Projects

    OpenAIRE

    Orlando, Maria Beatriz; Janik, Vanessa Lopes; Vaidya, Pranav; Angelou, Nicolina; Zumbyte, Ieva; Adams, Norma

    2018-01-01

    Getting to Gender Equality in Electricity Infrastructure: Lessons from Electricity Generation, Transmission, and Distribution Projects examines the social and gender footprint of large-scale electricity generation, transmission, and distribution projects to establish a foundation on which further research and replication of good practices can be built. The main impact pathways analyzed are...

  14. 25 CFR 170.415 - What is pre-project planning?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is pre-project planning? 170.415 Section 170.415... PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range Transportation Planning § 170.415 What is pre-project planning? (a) Pre-project planning is part of overall...

  15. Crowdfunding Astronomy Outreach Projects: Lessons learned from the UNAWE crowdfunding campaign

    Science.gov (United States)

    Ashton, A. J., Heenatigala, T.; Russo, P.

    2014-12-01

    In recent years, crowdfunding has become a popular method of funding new technology or entertainment products, or artistic projects. The idea is that people or projects ask for many small donations from individuals who support the proposed work, rather than a large amount from a single source. Crowdfunding is usually done via an online portal or platform which handles the financial transactions involved. The Universe Awareness (UNAWE) programme decided to undertake a Kickstarter1 crowdfunding campaign centring on the resource Universe in a Box. In this article we present the lessons learned and best practices from that campaign.

  16. Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

    International Nuclear Information System (INIS)

    Kumthekar, U.A.; Chiou, J.D.

    2006-01-01

    The On-Site Disposal Facility (OSDF) at the U.S. Department of Energy's (DOE) Fernald Closure Project near Cincinnati, Ohio is an engineered above-grade waste disposal facility being constructed to permanently store low level radioactive waste (LLRW) and treated mixed LLRW generated during Decommissioning and Demolition (D and D) and soil remediation performed in order to achieve the final land use goal at the site. The OSDF is engineered to store 2.93 million cubic yards of waste derived from the remediation activities. The OSDF is intended to isolate its LLRW from the environment for at least 200 years and for up to 1,000 years to the extent practicable and achievable. Construction of the OSDF started in 1997 and waste placement activities will complete by the middle of April 2006 with the final cover (cap) placement over the last open cell by the end of Spring 2006. An on-site disposal alternative is considered critical to the success of many large-scale DOE remediation projects throughout the United States. However, for various reasons this cost effective alternative is not readily available in many cases. Over the last ten years Fluor Fernald Inc. has cumulated many valuable lessons learned through the complex engineering, construction, operation, and closure processes of the OSDF. Also in the last several years representatives from other DOE sites, State agencies, as well as foreign government agencies have visited the Fernald site to look for proven experiences and practices, which may be adapted for their sites. This paper present a summary of the major issues and lessons leaned at the Fernald site related to engineering, construction, operation, and closure processes for the disposal of remediation waste. The purpose of this paper is to share lessons learned and to benefit other projects considering or operating similar on-site disposal facilities from our successful experiences. (authors)

  17. Non-Profit/Higher Education Project Management Series: The Project Plan

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  18. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  19. Design Lessons Drawn from the Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    2011-05-01

    This report provides an updated compilation incorporating the most recent lessons learned from decommissioning and remediation projects. It is intended as a 'road map' to those seeking to apply these lessons. The report presents the issues in a concise and systematic manner, along with practical, thought-provoking examples. The most important lessons learned in recent years are organized and examined to enable the intended audience to gauge the importance of this aspect of the planning for new nuclear facilities. These will be of special interest to those seeking to construct nuclear facilities for the first time. In Sections 1 and 2, the current situation in the field of decommissioning is reviewed and the relevance and importance of beneficial design features is introduced. A more detailed review of previous and current lessons learned from decommissioning is given in Section 3 where different aspects of the decommissioning process are analysed. From this analysis beneficial design features have been extracted and identified in Section 4 which includes two comprehensive tables where brief descriptions of the features are summarized and responsibilities are identified. Conclusions and key design features and key recommendations are given in Section 5. Two Annexes are included to provide lessons from past projects and past experience and to record notes and extracts taken from a comprehensive list of publications listed in the References on page 47.

  20. Strategic Program Planning Lessons Learned In Developing The Long-Term Stewardship Science and Technology Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, B.W.; Hanson, D.J.; Matthern, G.E.

    2003-04-24

    Technology roadmapping is a strategic planning method used by companies to identify and plan the development of technologies necessary for new products. The U.S. Department of Energy's Office of Environmental Management has used this same method to refine requirements and identify knowledge and tools needed for completion of defined missions. This paper describes the process of applying roadmapping to clarify mission requirements and identify enhancing technologies for the Long-Term Stewardship (LTS) of polluted sites after site cleanup has been completed. The nature of some contamination problems is such that full cleanup is not achievable with current technologies and some residual hazards remain. LTS maintains engineered contaminant barriers and land use restriction controls, and monitors residual contaminants until they no longer pose a risk to the public or the environment. Roadmapping was used to clarify the breadth of the LTS mission, to identify capability enhancements needed to improve mission effectiveness and efficiency, and to chart out the research and development efforts to provide those enhancements. This paper is a case study of the application of roadmapping for program planning and technical risk management. Differences between the planned and actual application of the roadmapping process are presented along with lessons learned. Both the process used and lessons learned should be of interest for anyone contemplating a similar technology based planning effort.

  1. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  2. 49 CFR 633.25 - Contents of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  3. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  4. Evaluation of regional project to strengthen national health research systems in four countries in West Africa: lessons learned.

    Science.gov (United States)

    Sombié, Issiaka; Aidam, Jude; Montorzi, Gabriela

    2017-07-12

    Since the Commission on Health Research for Development (COHRED) published its flagship report, more attention has been focused on strengthening national health research systems (NHRS). This paper evaluates the contribution of a regional project that used a participatory approach to strengthen NHRS in four post-conflict West African countries - Guinea-Bissau, Liberia, Sierra Leone and Mali. The data from the situation analysis conducted at the start of the project was compared to data from the project's final evaluation, using a hybrid conceptual framework built around four key areas identified through the analysis of existing frameworks. The four areas are governance and management, capacities, funding, and dissemination/use of research findings. The project helped improve the countries' governance and management mechanisms without strengthening the entire NHRS. In the four countries, at least one policy, plan or research agenda was developed. One country put in place a national health research ethics committee, while all four countries could adopt a research information management system. The participatory approach and support from the West African Health Organisation and COHRED were all determining factors. The lessons learned from this project show that the fragile context of these countries requires long-term engagement and that support from a regional institution is needed to address existing challenges and successfully strengthen the entire NHRS.

  5. Policy and planning for large infrastructure projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2005-01-01

    This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation ...... for large infrastructure projects, with a focus on better planning methods and changed governance structures, the latter being more important.......This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation...... the likelihood that it is their projects, and not the competition's, that gain approval and funding. This results in the "survival of the unfittest," where often it is not the best projects that are built, but the most misrepresented ones. Finally, the paper presents measures for reforming policy and planning...

  6. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  7. A Lesson about the Circular Flow. Active Learning Lessons. Economics International.

    Science.gov (United States)

    Landfried, Janet

    This lesson plan was developed through "Economics International," an international program to help build economic education infrastructures in the emerging market economies. It provides a lesson description; appropriate grade level; economic concepts; content standards and benchmarks; related subjects; instructional objectives; time…

  8. PUREX/UO3 Facilities deactivation lessons learned history

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1996-09-19

    accompanied by and were an integral part of sweeping ``culture changes,`` the story of the lessons learned during the PUREX Deactivation Project are worth recounting. Foremost among the lessons is recognizing the benefits of ``right to left`` project planning. A deactivation project must start by identifying its end points, then make every task, budget, and organizational decision based on reaching those end points. Along with this key lesson is the knowledge that project planning and scheduling should be tied directly to costing, and the project status should be checked often (more often than needed to meet mandated reporting requirements) to reflect real-time work. People working on a successful project should never be guessing about its schedule or living with a paper schedule that does not represent the actual state of work. Other salient lessons were learned in the PUREX/UO3 Deactivation Project that support these guiding principles. They include recognizing the value of independent review, teamwork, and reengineering concepts; the need and value of cooperation between the DOE, its contractors, regulators, and stakeholders; and the essential nature of early and ongoing communication. Managing a successful project also requires being willing to take a fresh look at safety requirements and to apply them in a streamlined and sensible manner to deactivating facilities; draw on the enormous value of resident knowledge acquired by people over years and sometimes decades of working in old plants; and recognize the value of bringing in outside expertise for certain specialized tasks.This approach makes possible discovering the savings that can come when many creative options are pursued persistently and the wisdom of leaving some decisions to the future. The essential job of a deactivation project is to place a facility in a safe, stable, low-maintenance mode, for an interim period. Specific end points are identified to recognize and document this state. Keeping the limited

  9. Pollution prevention program for new projects -- Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Lum, J. [Dept. of Energy, Washington, DC (United States)

    1993-03-01

    The purpose of this presentation is to relay the experience of the Office of New Production Reactors (NP) in developing and implementing its pollution prevention program. NP was established to plan, design, and construct a new safe and environmentally acceptable nuclear reactor capacity necessary to provide an assured supply of tritium to maintain the nation`s long-term deterrent capability. The Program offered the Department of Energy an opportunity to demonstrate its commitment to environmental protection via minimization of environmental releases; new design offers the best opportunity for pollution prevention. The NP pollution prevention program was never fully implemented because NP`s tritium production design activity was recovery terminated. The information in this paper represented lessons learned from the last three years of NP operation.

  10. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  11. Dynamic and stochastic multi-project planning

    CERN Document Server

    Melchiors, Philipp

    2015-01-01

    This book deals with dynamic and stochastic methods for multi-project planning. Based on the idea of using queueing networks for the analysis of dynamic-stochastic multi-project environments this book addresses two problems: detailed scheduling of project activities, and integrated order acceptance and capacity planning. In an extensive simulation study, the book thoroughly investigates existing scheduling policies. To obtain optimal and near optimal scheduling policies new models and algorithms are proposed based on the theory of Markov decision processes and Approximate Dynamic programming.

  12. Planning, Management and Organizational Aspects of the Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    2013-08-01

    Many old reactors and other nuclear facilities worldwide are being actively dismantled or are candidates for decommissioning in the near term. A significant number of these facilities are located in Member States having little experience or expertise in planning and implementing state of the art decommissioning projects. Planning, management and organization are critical for the success of such projects. The main objective of IAEA technical activities related to decommissioning is to promote the exchange of lessons learned, thereby contributing to successful planning and implementation of decommissioning projects. Imperative for success is a better understanding of the decision making process, the comparison and selection of decommissioning plans and organizational provisions, and relevant issues affecting the entire decommissioning process. Topics addressed in this publication include details on development of the decommissioning plan, structuring of key project tasks, organizing the project management team, identifying key staffing positions and determining required workforce skills, and managing the transition from an operational phase to the decommissioning phase. It is expected that this project, and in particular the papers collected in this publication, will draw Member States' attention to the practicality and achievability of timely planning and smooth management of decommissioning projects, especially for smaller projects. Concluding reports summarizing the work undertaken under the aegis of a coordinated research project (CRP) on planning, management and organizational aspects in the decommissioning of nuclear facilities, and presented at the third and final research coordination meeting (RCM) held in Da Lat, Vietnam, 5-9 September 2011, are included in this publication. Operating experience and lessons learned during full scale applications, as well as national programmes and plans, are among the most significant achievements of the CRP and have been

  13. Planning, Management and Organizational Aspects of the Decommissioning of Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Many old reactors and other nuclear facilities worldwide are being actively dismantled or are candidates for decommissioning in the near term. A significant number of these facilities are located in Member States having little experience or expertise in planning and implementing state of the art decommissioning projects. Planning, management and organization are critical for the success of such projects. The main objective of IAEA technical activities related to decommissioning is to promote the exchange of lessons learned, thereby contributing to successful planning and implementation of decommissioning projects. Imperative for success is a better understanding of the decision making process, the comparison and selection of decommissioning plans and organizational provisions, and relevant issues affecting the entire decommissioning process. Topics addressed in this publication include details on development of the decommissioning plan, structuring of key project tasks, organizing the project management team, identifying key staffing positions and determining required workforce skills, and managing the transition from an operational phase to the decommissioning phase. It is expected that this project, and in particular the papers collected in this publication, will draw Member States' attention to the practicality and achievability of timely planning and smooth management of decommissioning projects, especially for smaller projects. Concluding reports summarizing the work undertaken under the aegis of a coordinated research project (CRP) on planning, management and organizational aspects in the decommissioning of nuclear facilities, and presented at the third and final research coordination meeting (RCM) held in Da Lat, Vietnam, 5-9 September 2011, are included in this publication. Operating experience and lessons learned during full scale applications, as well as national programmes and plans, are among the most significant achievements of the CRP and have been

  14. Research-Based Development of a Lesson Plan on Shower Gels and Musk Fragrances Following a Socio-Critical and Problem-Oriented Approach to Chemistry Teaching

    Science.gov (United States)

    Marks, Ralf; Eilks, Ingo

    2010-01-01

    A case is described of the development of a lesson plan for 10th grade (age range 15-16) chemistry classes on the chemistry of shower gels. The lesson plan follows a socio-critical and problem-oriented approach to chemistry teaching. This means that, aside from learning about the basic chemistry of the components making up modern shower gels in…

  15. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  16. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  17. Constellation Program Lessons Learned. Volume 2; Detailed Lessons Learned

    Science.gov (United States)

    Rhatigan, Jennifer; Neubek, Deborah J.; Thomas, L. Dale

    2011-01-01

    These lessons learned are part of a suite of hardware, software, test results, designs, knowledge base, and documentation that comprises the legacy of the Constellation Program. The context, summary information, and lessons learned are presented in a factual format, as known and described at the time. While our opinions might be discernable in the context, we have avoided all but factually sustainable statements. Statements should not be viewed as being either positive or negative; their value lies in what we did and what we learned that is worthy of passing on. The lessons include both "dos" and "don ts." In many cases, one person s "do" can be viewed as another person s "don t"; therefore, we have attempted to capture both perspectives when applicable and useful. While Volume I summarizes the views of those who managed the program, this Volume II encompasses the views at the working level, describing how the program challenges manifested in day-to-day activities. Here we see themes that were perhaps hinted at, but not completely addressed, in Volume I: unintended consequences of policies that worked well at higher levels but lacked proper implementation at the working level; long-term effects of the "generation gap" in human space flight development, the need to demonstrate early successes at the expense of thorough planning, and the consequences of problems and challenges not yet addressed because other problems and challenges were more immediate or manifest. Not all lessons learned have the benefit of being operationally vetted, since the program was cancelled shortly after Preliminary Design Review. We avoid making statements about operational consequences (with the exception of testing and test flights that did occur), but we do attempt to provide insight into how operational thinking influenced design and testing. The lessons have been formatted with a description, along with supporting information, a succinct statement of the lesson learned, and

  18. ISS Solar Array Alpha Rotary Joint (SARJ) Bearing Failure and Recovery: Technical and Project Management Lessons Learned

    Science.gov (United States)

    DellaCorte, Christopher; Krantz, Timothy L.; Dube, Michael J.

    2011-01-01

    The photovoltaic solar panels on the International Space Station (ISS) track the Sun through continuous rotating motion enabled by large bearings on the main truss called solar array alpha rotary joints (SARJs). In late 2007, shortly after installation, the starboard SARJ had become hard to turn and had to be shut down after exceeding drive current safety limits. The port SARJ, of the same design, had been working well for over 2 years. An exhaustive failure investigation ensued that included multiple extravehicular activities to collect information and samples for engineering forensics, detailed structural and thermal analyses, and a careful review of the build records. The ultimate root cause was determined to be kinematic design vulnerability coupled with inadequate lubrication, and manufacturing flaws; this was corroborated through ground tests, metallurgical studies, and modeling. A highly successful recovery plan was developed and implemented that included replacing worn and damaged components in orbit and applying space-compatible grease to improve lubrication. Beyond the technical aspects, however, lie several key programmatic lessons learned. These lessons, such as running ground tests to intentional failure to experimentally verify failure modes, are reviewed and discussed so they can be applied to future projects to avoid such problems.

  19. The Development of the Comic Spirit in 17th Century England from James Shirley to William Congreve. Curriculum Projects, April 7-June 16, 1992. The Huntington Theatre Company Master Works Study in Restoration Comedy.

    Science.gov (United States)

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Restoration Comedy, this collection presents one-day lesson plans and curriculum projects for teaching Restoration comedy. The collection offers 15 one-day lesson plans and 15 curriculum projects (ranging over several weeks) suitable for secondary school…

  20. The German Chernobyl project: Lessons learned

    International Nuclear Information System (INIS)

    Hill, P.; Hille, R.

    1999-01-01

    This report presents results and lessons learned by one of the so far largest assessments of a post-accidental situation. Funded by the Federal Republic of Germany the German Chernobyl Project investigated in the years 1991-1993 the radiological situation in contaminated regions of the Russian Federation, Belarus and Ukraine. Measurements included a mass screening of the population in order to determine the Cesium body burdens of 250,000+ individuals in more than 240 settlements as well as the evaluation of external doses in selected settlements with soil contaminations varying from less than 74 kBq/m 2 to about 3700 kBq/m 2 including some, where decontamination measures had previously been taken. Also in many settlements environmental monitoring was undertaken. For most individuals doses did not exceed the international annual limits set for the general population. Open and comprehensive communication of results was favourably accepted by the public. In a few settlements the radiological situation has been followed up till to date. (author)

  1. Examining the Effect of Lesson Study on Prospective Primary Teachers’ Knowledge of Lesson Planning [Ders İmecesinin Sınıf Öğretmeni Adaylarının Matematik Dersini Planlama Bilgilerine Etkisinin İncelenmesi

    Directory of Open Access Journals (Sweden)

    Müjgan Baki

    2015-08-01

    Full Text Available This article reflects a special part of a research conducted to examine the effect of lesson study on prospective classroom teachers’ mathematical pedagogical content knowledge (MPCK. In this article, the special part consists of prospective teachers’ knowledge of lesson planning including a mastery of planning an affective lesson taking into account student’s current knowledge, understanding and difficulties within mathematics. Therefore, the research question is how lesson study practices affect prospective classroom teachers’ knowledge of lesson planning as a sub component of MPCK. The research is conducted with 12 prospective classroom teachers, six of them have already assisted to lesson study and the others have not. Data collection tools consist of video records, class observations, field notes, interviews and lesson plans prepared and used by prospective teachers participated in lesson study. Findings indicated that the prospective classroom teachers who participated in lesson study improved their knowledge in terms of planning an affective lesson taking student’s current knowledge and understanding into consideration. They appeared to be aware of selecting and ordering appropriate activities related to the actual objectives of the mathematical topics. They also appeared to be better in lesson organization and lesson presentation comparing to the other group of prospective teachers who did not participated in lesson study. [Bu makale, Öğretmenlik Uygulaması derslerinde uygulanan ders imecesi modelinin sınıf öğretmeni adaylarının alanı öğretme bilgilerine etkisini izlemek amacıyla yapılan bir araştırmanın bir bölümünü yansıtmaktadır. Makalede alanı öğretme bilgisinin alt bileşenlerinden olan öğrenme-öğretme sürecini planlama boyutuna odaklanılarak ‘Ders imecesi uygulaması, sınıf öğretmeni adaylarının öğrenme öğretme sürecini planlama bilgilerinin gelişimini nasıl etkilemektedir

  2. Yakima fisheries project spring chinook supplementation monitoring plan

    International Nuclear Information System (INIS)

    Busack, C.; Pearsons, T.; Knudsen, C.; Phelps, S.; Watson, B.; Johnston, M.

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document

  3. Tools for Supporting Distributed Agile Project Planning

    Science.gov (United States)

    Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda

    Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.

  4. [Economics] Introductory Lesson (Begin Day One). Lesson Plan.

    Science.gov (United States)

    Lewin, Roland

    This introductory lesson on teaching economics concepts contains sections on the following: purpose; objectives; time; materials needed; and step-by-step classroom procedures. The focus is on the economic problem of scarcity and opportunity costs. Attached is an original skit, "There's no such thing as a free lunch," and a chart that…

  5. Community-based interventions for obesity prevention: lessons learned by Australian policy-makers

    Directory of Open Access Journals (Sweden)

    Haby Michelle M

    2012-01-01

    Full Text Available Abstract Background Interest in community-based interventions (CBIs for health promotion is increasing, with a lot of recent activity in the field. This paper aims, from a state government perspective, to examine the experience of funding and managing six obesity prevention CBIs, to identify lessons learned and to consider the implications for future investment. Specifically, we focus on the planning, government support, evaluation, research and workforce development required. Methods The lessons presented in this paper come from analysis of key project documents, the experience of the authors in managing the projects and from feedback obtained from key program stakeholders. Results CBIs require careful management, including sufficient planning time and clear governance structures. Selection of interventions should be based on evidence and tailored to local needs to ensure adequate penetration in the community. Workforce and community capacity must be assessed and addressed when selecting communities. Supporting the health promotion workforce to become adequately skilled and experienced in evaluation and research is also necessary before implementation. Comprehensive evaluation of future projects is challenging on both technical and affordability grounds. Greater emphasis may be needed on process evaluation complemented by organisation-level measures of impact and monitoring of nutrition and physical activity behaviours. Conclusions CBIs offer potential as one of a mix of approaches to obesity prevention. If successful approaches are to be expanded, care must be taken to incorporate lessons from existing and past projects. To do this, government must show strong leadership and work in partnership with the research community and local practitioners.

  6. Linear-programming-based heuristics for project capacity planning

    NARCIS (Netherlands)

    Gademann, A.J.R.M.; Schutten, J.M.J.

    2005-01-01

    Many multi-project organizations are capacity driven, which means that their operations are constrained by various scarce resources. An important planning aspect in a capacity driven multi-project organization is capacity planning. By capacity planning, we mean the problem of matching demand for

  7. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  8. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  9. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  10. Cost-effective conservation planning: lessons from economics.

    Science.gov (United States)

    Duke, Joshua M; Dundas, Steven J; Messer, Kent D

    2013-08-15

    Economists advocate that the billions of public dollars spent on conservation be allocated to achieve the largest possible social benefit. This is "cost-effective conservation"-a process that incorporates both monetized benefits and costs. Though controversial, cost-effective conservation is poorly understood and rarely implemented by planners. Drawing from the largest publicly financed conservation programs in the United States, this paper seeks to improve the communication from economists to planners and to overcome resistance to cost-effective conservation. Fifteen practical lessons are distilled, including the negative implications of limiting selection with political constraints, using nonmonetized benefit measures or benefit indices, ignoring development risk, using incomplete cost measures, employing cost measures sequentially, and using benefit indices to capture costs. The paper highlights interrelationships between benefits and complications such as capitalization and intertemporal planning. The paper concludes by identifying the challenges at the research frontier, including incentive problems associated with adverse selection, additionality, and slippage. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Planning adaptation for food and farming: lessons from 40 year's research

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Hannah; Chambwera, Muyeye; Murray, Laurel

    2012-05-15

    Local farmers and pastoralists in poor countries have long coped with droughts, floods and variable rainfall patterns. This first-hand experience is invaluable for those working on climate change adaptation policies, but how do we access it? The International Institute for Environment and Development (IIED) has 40 years' experience working alongside vulnerable communities to help inform regional, national and global policies. Our research has shown that measures to increase climate change resilience must view food, energy, water and waste management systems as interconnected and mutually dependent. This holistic approach must also be applied to economic analysis on adaptation planning. Similarly, it is vital to use traditional knowledge and management skills, which can further support adaptation planning. Taking these lessons into account, we can then address the emerging policy challenges that we face.

  12. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  13. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  14. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  15. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  16. Lessons Learned Report for the radioactive mixed waste land disposal facility (Trench 31, Project W-025)

    International Nuclear Information System (INIS)

    Irons, L.G.

    1995-01-01

    This report presents the lessons learned from a project that involved modification to the existing burial grounds at the Hanford Reservation. This project has been focused on the development and operation of a Resource Conservation and Recovery Act compliant landfill which will accept low-level radioactive wastes that have been placed in proper containers

  17. National Ignition Facility project acquisition plan

    International Nuclear Information System (INIS)

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF

  18. Spent Nuclear Fuel Project operational staffing plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1996-03-01

    Using the Spent Nuclear Fuel (SNF) Project's current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M ampersand O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M ampersand O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins

  19. Single-Shell Tank (SST) Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  20. Support of an Active Science Project by a Large Information System: Lessons for the EOS Era

    Science.gov (United States)

    Angelici, Gary L.; Skiles, J. W.; Popovici, Lidia Z.

    1993-01-01

    The ability of large information systems to support the changing data requirements of active science projects is being tested in a NASA collaborative study. This paper briefly profiles both the active science project and the large information system involved in this effort and offers some observations about the effectiveness of the project support. This is followed by lessons that are important for those participating in large information systems that need to support active science projects or that make available the valuable data produced by these projects. We learned in this work that it is difficult for a large information system focused on long term data management to satisfy the requirements of an on-going science project. For example, in order to provide the best service, it is important for all information system staff to keep focused on the needs and constraints of the scientists in the development of appropriate services. If the lessons learned in this and other science support experiences are not applied by those involved with large information systems of the EOS (Earth Observing System) era, then the final data products produced by future science projects may not be robust or of high quality, thereby making the conduct of the project science less efficacious and reducing the value of these unique suites of data for future research.

  1. Design, Implementation, and Lessons Learned from a Digital Storytelling Project in an Undergraduate Health Promotion Theory Course

    Science.gov (United States)

    Rimando, Marylen; Smalley, K. Bryant; Warren, Jacob C.

    2015-01-01

    This article describes the design, implementation and lessons learned from a digital storytelling project in a health promotion theory course. From 2011-2012, 195 health promotion majors completed a digital storytelling project at a Midwestern university. The instructor observed students' understanding of theories and models. This article adds to…

  2. Study on Top-Down Estimation Method of Software Project Planning

    Institute of Scientific and Technical Information of China (English)

    ZHANG Jun-guang; L(U) Ting-jie; ZHAO Yu-mei

    2006-01-01

    This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software project plan as an associative unit for study. During a top-down estimation of a software project, Program Evaluation and Review Technique (PERT) method and analogy method are combined to estimate its size, then effort estimation and specific schedules are obtained according to distributions of the phase effort. This allows a set of practical and feasible planning methods to be constructed. Actual data indicate that this set of methods can lead to effective software project planning.

  3. Effects of Teacher Preparation Courses: Do Graduates Use What They Learned to Plan Mathematics Lessons?

    Science.gov (United States)

    Morris, Anne K.; Hiebert, James

    2017-01-01

    We investigated whether the content pre-service teachers studied in elementary teacher preparation mathematics courses was related to their performance on a mathematics lesson planning task 2 and 3 years after graduation. The relevant mathematics knowledge was studied when the teachers were freshmen, 5 to 6 years earlier. Results showed that when…

  4. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  5. A sample lesson plan for the course English Composition II

    Directory of Open Access Journals (Sweden)

    Córdoba Cubillo, Patricia

    2005-03-01

    Full Text Available The goal of this article is to present a lesson plan and a series of sample tasks to help the instructors from the course English Composition II, at the School of Modern Languages from the University of Costa Rica, to guide students write an essay integrating the four skills: listening, speaking, reading, and writing. These activities will be a source of comprehensible input for the learners that will hopefully result in a good writing piece. El objetivo de este artículo es presentar un plan de lección y una serie de actividades que le ayudarán a los y las instructoras del curso Composición Inglesa II de la Escuela de Lenguas Modernas de la Universidad de Costa Rica a guiar a sus estudiantes a escribir un ensayo integrando las cuatro macro-destrezas, a saber comprensión auditiva, conversación, lectura y escritura. Mediante estas actividades se espera que los estudiantes elaboren un ensayo de calidad.

  6. The effectiveness of CCDSR learning model to improve skills of creating lesson plan and worksheet science process skill (SPS) for pre-service physics teacher

    Science.gov (United States)

    Limatahu, I.; Suyatno; Wasis; Prahani, B. K.

    2018-03-01

    In the previous research, CCDSR (Condition, Construction, Development, Simulation, and Reflection) learning model has been developed to improve science process skills for pre-service physics teacher. This research is aimed to analyze the effectiveness of CCDSR learning model towards the improvement skills of creating lesson plan and worksheet of Science Process Skill (SPS) for pre-service physics teacher in academic year 2016/2017. This research used one group pre-test and post-test design on 12 pre-service physics teacher at Physics Education, University of Khairun. Data collection was conducted through test and observation. Creating lesson plan and worksheet SPS skills of pre-service physics teacher measurement were conducted through Science Process Skill Evaluation Sheet (SPSES). The data analysis technique was done by Wilcoxon t-test and n-gain. The CCDSR learning model consists of 5 phases, including (1) Condition, (2) Construction, (3) Development, (4) Simulation, and (5) Reflection. The results showed that there was a significant increase in creating lesson plan and worksheet SPS skills of pre-service physics teacher at α = 5% and n-gain average of moderate category. Thus, the CCDSR learning model is effective for improving skills of creating lesson plan and worksheet SPS for pre-service physics teacher.

  7. Planning a change project in mental health nursing.

    Science.gov (United States)

    Thorpe, Rebecca

    2015-09-02

    This article outlines a plan for a change project to improve the quality of physical health care on mental health wards. The plan was designed to improve the monitoring and recording of respiratory rates on mental health wards, through the implementation of a training programme for staff. A root cause analysis was used to explore the reasons for the low incidence of respiratory rate measurement on mental health wards, and the results of this establish the basis of the proposed change project and its aims and objectives. The article describes how the project could be implemented using a change management model, as well as how its effects could be measured and evaluated. Potential barriers to the planned change project are discussed, including the human dimensions of change. The article suggests methods to overcome such barriers, discusses the value of leadership as an important factor, and examines the principles of clinical governance in the context of the planned change project.

  8. Value pricing pilot program : lessons learned

    Science.gov (United States)

    2008-08-01

    This "Lessons Learned Report" provides a summary of projects sponsored by the Federal Highway Administration's (FHWA's) Congestion and Value Pricing Pilot Programs from 1991 through 2006 and draws lessons from a sample of projects with the richest an...

  9. Life sciences space biology project planning

    Science.gov (United States)

    Primeaux, G.; Newkirk, K.; Miller, L.; Lewis, G.; Michaud, R.

    1988-01-01

    The Life Sciences Space Biology (LSSB) research will explore the effect of microgravity on humans, including the physiological, clinical, and sociological implications of space flight and the readaptations upon return to earth. Physiological anomalies from past U.S. space flights will be used in planning the LSSB project.The planning effort integrates science and engineering. Other goals of the LSSB project include the provision of macroscopic view of the earth's biosphere, and the development of spinoff technology for application on earth.

  10. Geocuration Lessons Learned from the Climate Data Initiative Project

    Science.gov (United States)

    Ramachandran, Rahul; Bugbee, Kaylin; Tilmes, Curt; Pinheiro Privette, Ana

    2015-01-01

    Curation is traditionally defined as the process of collecting and organizing information around a common subject matter or a topic of interest and typically occurs in museums, art galleries, and libraries. The task of organizing data around specific topics or themes is a vibrant and growing effort in the biological sciences but to date this effort has not been actively pursued in the Earth sciences. This presentation will introduce the concept of geocuration, which we define it as the act of searching, selecting, and synthesizing Earth science data/metadata and information from across disciplines and repositories into a single, cohesive, and useful compendium. We also present the Climate Data Initiative (CDI) project as an prototypical example. The CDI project is a systematic effort to manually curate and share openly available climate data from various federal agencies. CDI is a broad multi-agency effort of the U.S. government and seeks to leverage the extensive existing federal climate-relevant data to stimulate innovation and private-sector entrepreneurship to support national climate change preparedness. The geocuration process used in the CDI project, key lessons learned, and suggestions to improve similar geocuration efforts in the future will be part of this presentation.

  11. Geocuration Lessons Learned from the Climate Data Initiative Project

    Science.gov (United States)

    Ramachandran, R.; Bugbee, K.; Tilmes, C.; Privette, A. P.

    2015-12-01

    Curation is traditionally defined as the process of collecting and organizing information around a common subject matter or a topic of interest and typically occurs in museums, art galleries, and libraries. The task of organizing data around specific topics or themes is a vibrant and growing effort in the biological sciences but to date this effort has not been actively pursued in the Earth sciences. This presentation will introduce the concept of geocuration, which we define it as the act of searching, selecting, and synthesizing Earth science data/metadata and information from across disciplines and repositories into a single, cohesive, and useful compendium.We also present the Climate Data Initiative (CDI) project as an exemplar example. The CDI project is a systematic effort to manually curate and share openly available climate data from various federal agencies. CDI is a broad multi-agency effort of the U.S. government and seeks to leverage the extensive existing federal climate-relevant data to stimulate innovation and private-sector entrepreneurship to support national climate-change preparedness. The geocuration process used in CDI project, key lessons learned, and suggestions to improve similar geocuration efforts in the future will be part of this presentation.

  12. A Grounded Theory of Preservice Music Educators' Lesson Planning Processes within Field Experience Methods Courses

    Science.gov (United States)

    Parker, Elizabeth Cassidy; Bond, Vanessa L.; Powell, Sean R.

    2017-01-01

    The purpose of this grounded theory study was to understand the process of field experience lesson planning for preservice music educators enrolled in choral, general, and instrumental music education courses within three university contexts. Data sources included multiple interviews, written responses, and field texts from 42 participants. Four…

  13. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  14. National Security Technology Incubation Project Continuation Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-09-30

    This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

  15. Spent Nuclear Fuel project interface control plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This implementation process philosophy is in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve interface control within the SNF Project. This plan applies to all SNF Project sub-project to sub-project, and sub-project to exteranl (both on and off the Hanford Site) interfaces

  16. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  17. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  18. K-12 Phenology Lessons for the Phenocam Project

    Science.gov (United States)

    Bennett, K. F.

    2013-12-01

    Phenology is defined as periodic [or annual] life cycles of plants and animals driven by seasonal environmental changes. Climate change impinges a strong effect on phenology, potentially altering the structure and functioning of ecosystems. In the fall of 2011, the Ashburnham-Westminster Regional School District became the first of five schools to join Harvard University's Phenocam Network with the installation of a webcam to monitor phenology (or 'phenocam') at Overlook Middle School in Ashburnham, Massachusetts. Our school district is now part of a network of near-surface remote sensing phenocams that capture and send images of forest, shrub, and grassland vegetation cover at more than 130 diverse sites in North America. Our phenocam provides a digital image every half hour of the mixed forest canopy north from the school, enabling the detection of changes in canopy development, quantified as canopy 'greenness'. As a part of the Phenocam project, students at the K-12 level have expanded the scope of phenological monitoring protocol that is part of the Harvard Forest Schoolyard Ecology Program, Buds, Leaves, and Global Warming. In this protocol, students work with ecologists at Harvard Forest to monitor buds and leaves on schoolyard trees to determine the length of the growing season, giving them the opportunity to be a part of real and important research concerning the critical environmental issue of climate change. Students involved in the Buds, Leaves, and Global Warming study have the opportunity to compare their ground data on budburst, color change, and leaf drop to the phenocam images, as well as to similar forested sites in locations throughout the United States. Lessons have been developed for comparing student data to phenocam images, canopy greenness time series graphs extracted from the images, and satellite data. Lessons addressing map scale and the Urban Heat Island effect will also be available for teachers. This project will greatly enhance the

  19. Charismatic Leaders: A Lesson Plan.

    Science.gov (United States)

    Johns, Robert W.

    1983-01-01

    Focusing upon Franklin D. Roosevelt and Adolf Hitler, these lessons for high school students in U.S. or world history courses deal with what charismatic leadership is, what circumstances and personality factors generate charismatic movements, and the role, results, and dangers of charismatic leadership. (RM)

  20. Regulatory analysis and lessons learned from the LLRW [low-level radioactive waste] disposal area at West Valley, New York: Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The New York State Energy Research and Development Authority has sponsored a project to develop an integrated set of site management plans for the West Valley low-level radioactive waste (LLRW) disposal area. The plans were directed to upgrade the disposal area so that passive custodial care and monitoring activities would be sufficient to protect public health and safety and the environment. Tasks 5 and 6, Regulatory Analysis and Lessons Learned, are the subject of this report. The regulatory analysis identified areas of inconsistencies between the historic site operations and the current state and federal LLRW disposal regulations and guidelines. The lessons learned task identified the causes of the disposal problems at West Valley, discussed the lessons learned, and described the responses developed by the NRC and industry to the lessons learned. 85 refs., 6 figs., 19 tabs

  1. Effective Lesson Planning: Field Trips in the Science Curriculum

    Science.gov (United States)

    Rieger, C. R.

    2010-10-01

    Science field trips can positively impact and motivate students. However, if a field trip is not executed properly, with appropriate preparation and follow-up reinforcement, it can result in a loss of valuable educational time and promote misconceptions in the students. This study was undertaken to determine if a classroom lesson before an out-of-the-classroom activity would affect learner gain more or less than a lesson after the activity. The study was based on the immersive theater movie ``Earth's Wild Ride'' coupled with a teacher-led Power Point lesson. The participants in the study were students in a sixth grade physical science class. The order of lessons showed no detectable effect on final learner outcomes. Based on pre- and post-testing, improvement in mean learning gain came from the teacher-led lesson independent of the movie. The visit to the immersive theater, however, had significant positive effects that did not show up in the quantitative results of the testing.

  2. Improving the primary school science learning unit about force and motion through lesson study

    Science.gov (United States)

    Phaikhumnam, Wuttichai; Yuenyong, Chokchai

    2018-01-01

    The study aimed to develop primary school science lesson plan based on inquiry cycle (5Es) through lesson study. The study focused on the development of 4 primary school science lesson plans of force and motion for Grade 3 students in KKU Demonstration Primary School (Suksasart), first semester of 2015 academic year. The methodology is mixed method. The Inthaprasitha (2010) lesson study cycle was implemented in group of KKU Demonstration Primary School. Instruments of reflection of lesson plan developing included participant observation, meeting and reflection report, lesson plan and other document. The instruments of examining students' learning include classroom observation and achievement test. Data was categorized from these instruments to find the issues of changing and improving the good lesson plan of Thai primary school science learning. The findings revealed that teachers could develop the lesson plans through lesson study. The issues of changing and improving were disused by considering on engaging students related to societal issues, students' prior knowledge, scientific concepts for primary school students, and what they learned from their changing. It indicated that the Lesson Study allowed primary school science teachers to share ideas and develop ideas to improve the lesson. The study may have implications for Thai science teacher education through Lesson Study.

  3. Convincing American Women to Join in the Efforts to Win World War I: A Lesson Plan.

    Science.gov (United States)

    Sunal, Cynthia S.; Haas, Mary E.

    1994-01-01

    Asserts that World War I, unlike previous wars, was not fought by small groups of professional soldiers, but with large groups of citizens, including women. Presents a lesson plan using poster and postcards that examines methods used by the U.S. government to rally women to join the war effort. (CFR)

  4. Teacher Improvement Projects in Guinea: Lessons Learned from Taking a Program to National Scale.

    Science.gov (United States)

    Schwille, John; Dembele, Martial; Diallo, Alpha Mahmoudou

    2001-01-01

    Highlights lessons learned from a small, grant-funded teacher improvement project in Guinea that went nationwide, including: it is possible to make such a system work on a national scale in a resource-scarce country; effective initial and continued training is critical for all participants; it is difficult to provide close-to-school assistance…

  5. Lesson Study and History Education

    Science.gov (United States)

    Halvorsen, Anne-Lise; Kesler Lund, Alisa

    2013-01-01

    This article examines the experiences of a group of fifth-grade teachers who used lesson study, a teacher-driven form of professional development, to teach history in a project supported by a Teaching American History Grant. The project addressed the following questions: What does a lesson study cycle for history education look like? What…

  6. Fuzzy multi-project rough-cut capacity planning

    NARCIS (Netherlands)

    Masmoudi, Malek; Hans, Elias W.; Leus, Roel; Hait, Alain; Sotskov, Yuri N.; Werner, Frank

    2014-01-01

    This chapter studies the incorporation of uncertainty into multi-project rough-cut capacity planning. We use fuzzy sets to model uncertainties, adhering to the so-called possibilistic approach. We refer to the resulting proactive planning environment as Fuzzy Rough Cut Capacity Planning (FRCCP).

  7. Denakenaga' for Children. Lesson Plans for Teaching Denakenaga' (Minto-Nenana Tanana) to Children in Elementary Grades.

    Science.gov (United States)

    Thompson, Chad; Frank, Ellen

    This curriculum for elementary school-level instruction in Denakenaga' is intended for development of oral native language skills. Included are plans for 60 25-minute lessons, arranged in 11 units: basic conversation; food and eating; hunting and animals; clothing and morning routine; weather; body parts; dogs and sleds; numbers; the village;…

  8. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  9. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  10. Pad A treatability study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-06-01

    This plan addresses the work to be accomplished by the Pad A Treatability Study Project. The purpose of this project is to investigate potential treatment and separation technologies, identify the best technologies, and to demonstrate by both lab- and pilot-scale demonstration, the most applicable remedial technologies for treating plutonium-contaminated salts at the Pad A site located at the Subsurface Disposal Area (SDA) at the Radioactive Waste Management Complex (RWMC) a the Idaho National Engineering Laboratory (INEL). The conduct of this project will be supported by other DOE laboratories, universities, and private industries, who will provide support for near-term demonstrations of treatment and separation technologies. The purpose of this long-range planning document is to present the detailed plan for the implementation of the Pad A Treatability Study Project

  11. PENGEMBANGAN TUGAS AKHIR MELALUI PROJECT BASED LEARNING MODEL UNTUK MENINGKATKAN GENERIC GREEN SKILLS SISWA

    Directory of Open Access Journals (Sweden)

    Ana Ana

    2015-02-01

    Full Text Available ABSTRACT The development of students’ final project through Project-based Learning (PBLapproach was conducted in the workshop of family resource management (FRM in 7th semester.PBL approach is expected to give contribution to students’ motivation and experience to finish their final assignments of FRM workshop. The objectives of the research are to: (1 develop PBL model for the students’final project; (2 produce learning instruments of PBL such as lesson plans, manual of FRM workshop, and scientific report of FRM workshop. The method of the study was using research and development of Plomp model and quasi experiment for testing the effectiveness of the model. The research subjects were the students from the class of 2009 and 2010 who joined FRM workshop course. The study produced model, lesson plans, and manual of FRM workshop as the outputs. The result showed that project based learning model was effective to improve the students’ generic green skills for project management, collaborative skills, and communicative competence. Keywords: final project, generic green skill, family resource management, Project-Based Learning

  12. Fast flux test facility, transition project plan

    International Nuclear Information System (INIS)

    Guttenberg, S.

    1994-01-01

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  13. Fast flux test facility, transition project plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  14. Evaluating Eyewitness Reports [Lesson Plan].

    Science.gov (United States)

    2000

    This lesson offers students experience in making historical meaning from eyewitness accounts that present a range of different perspectives. Students begin with a case study in working with alternative reports of a single event: the Great Chicago Fire of 1871. First, they compare two newspaper reports on the fire, then two memoirs of the fire…

  15. Spatial policy, planning and infrastructure investment: Lessons from ...

    African Journals Online (AJOL)

    Dr Louis J. Waldeck, Manager, Urban Dynamics Laboratory, CSIR Built ... funded Integrated Planning and Development Modelling (IPDM) project, the article ... areas ought to be grounded in robust and rigorous analysis and scenario evaluation. ... Partnership Infrastructure Grants ... in water supply and regional bulk.

  16. Project W-320 ALARA Plan

    International Nuclear Information System (INIS)

    Harty, W.M.

    1995-01-01

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials

  17. Project W-320 ALARA Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harty, W.M.

    1995-06-06

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials.

  18. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  19. 7 CFR 1948.78 - Growth management and housing planning projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  20. Lessons Learned from Environmental Remediation Programmes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-03-15

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  1. Lessons Learned from Environmental Remediation Programmes

    International Nuclear Information System (INIS)

    2014-01-01

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  2. Support and Dissemination of Teacher-Authored Lesson Plans: a Digital Library for Earth System Education (DLESE) and Geological Society of America (GSA) Collaboration

    Science.gov (United States)

    Devaul, H.; Pandya, R. E.; McLelland, C. V.

    2003-12-01

    The Digital Library for Earth System Education (www.dlese.org) and the Geological Society of America (www.geosociety.org) are working together to publish and disseminate teacher-authored Earth science lesson plans. DLESE is a community-based effort involving teachers, students, and scientists working together to create a library of educational resources and services to support Earth system science education. DLESE offers free access to electronic resources including lesson plans, maps, images, data sets, visualizations, and assessment activities. A number of thematic collections have recently been accessioned, which has substantially increased library holdings. Working in concert with GSA, a non-profit organization dedicated to the advancement of the geosciences, small-scale resource creators such as classroom teachers without access to a web server can also share educational resources of their own design. Following a two-step process, lesson plans are submitted to the GSA website, reviewed and posted to the K-12 resource area: http://www.geosociety.org/educate/resources.htm. These resources are also submitted to the DLESE Community Collection using a simple cataloging tool. In this way resources are available to other teachers via the GSA website as well as via the DLESE collection. GSA provides a template for lesson plan developers which assists in providing the necessary information to help users find and understand the intent of the activity when searching in DLESE. This initial effort can serve as a prototype for important services allowing individual community members to contribute their work to DLESE with little technical overhead.

  3. I Can Hardly Wait to See What I Am Going to Do Today: Lesson Planning Perspectives of Experienced Band Teachers

    Science.gov (United States)

    Shaw, Ryan D.

    2017-01-01

    The purpose of this study was to investigate the lesson planning practices of three experienced band teachers at the high school level. For the purposes of this study, experienced teachers were those with 25 or more years of teaching experience. Research questions were: (a) how do experienced high school band teachers plan for teaching, and (b)…

  4. Publiek-private samenwerking : adaptieve planning in theorie en praktijk

    NARCIS (Netherlands)

    Verhees, Gottfried

    2013-01-01

    The essence of this research lies in the exploration of planning theory, connecting this theory to complexity sciences and learning lessons on how to guide large spatial projects in innovative ways. These insights are applied to Public Private Partnerships to bring into the light the possibilities,

  5. "It Reminded Me of What Really Matters": Teacher Responses to the Lessons from Auschwitz Project

    Science.gov (United States)

    Maitles, Henry; Cowan, Paula

    2012-01-01

    Since 2007, the Lessons from Auschwitz Project organised by the Holocaust Education Trust, has taken groups of Scottish senior school students (between 16 and 18 years) and where possible an accompanying teacher from their school, to Auschwitz-Birkenau Memorial and Museum as part of a process of increasing young people's knowledge and…

  6. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  7. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  8. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    International Nuclear Information System (INIS)

    Filbert, Wolfgang; Herold, Philipp

    2015-01-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  9. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  10. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and projects...

  11. Fiscal planning of private electricity production projects

    International Nuclear Information System (INIS)

    Gauthier, R.

    2002-01-01

    Various fiscal considerations frequently encountered in the context of the planning of private electricity production projects were described. Two major themes were discussed: 1) the different jurisdictional vehicles that can be used during the planning of private electricity production projects and the associated fiscal considerations, and 2) the two main fiscal incentives of the Income Tax Act (Canada) which could impact on the financing and operation costs of such a project, namely the accelerated amortization and the possibility of deducting the costs associated to renewable energies and energy savings in Canada. This was a general presentation that did not go into specific details and did not represent a legal opinion. refs

  12. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  13. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  14. FY95 software project management plan: TMACS, CASS computer systems

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule

  15. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  16. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  17. Pu-238 Supply Program Project Execution Plan

    International Nuclear Information System (INIS)

    Wham, Robert M.; Martin, Sherman

    2012-01-01

    This Pu-238 Supply Program Project Execution Plan (PEP) summarizes critical information and processes necessary to manage the program. The PEP is the primary agreement regarding planning and objectives between The Department of Energy Office of Nuclear Energy (DOE NE-75), Oak Ridge National Laboratory Site Office (OSO) and the Oak Ridge National Laboratory (ORNL). The acquisition executive (AE) will approve the PEP. The PEP is a living document that will be reviewed and revised periodically until the project is complete. The purpose of the project is to reestablish the capability to produce plutonium-238 (Pu-238) domestically. This capability consists primarily of procedures, processes, and design information, not capital assets. As such, the project is not subject to the requirements of DOE O 413.3B, but it will be managed using the project management principles and best practices defined there. It is likely that some capital asset will need to be acquired to complete tasks within the project. As these are identified, project controls and related processes will be updated as necessary. Because the project at its initiation was envisioned to require significant capital assets, Critical Decision 0 (CD-0) was conducted in accordance with DOE O 413.3B, and the mission need was approved on December 9, 2003, by William Magwood IV, director of the Office of Nuclear Energy (NE), Science and Technology, DOE. No date was provided for project start-up at that time. This PEP is consistent with the strategy described in the June 2010 report to Congress, Start-up Plan for Plutonium-238 Production for Radioisotope Power Systems.

  18. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999

  19. Project management plan for exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    1983-08-01

    This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans

  20. Beautiful Beads: A Lesson in Making Beads with Friendly Clay. AMACO[R] Lesson.

    Science.gov (United States)

    Gamble, Harriet; Gamble, David

    This lesson resource includes a brief summary of the history of bead making and historic fascination with beads as adornment. A focus on design elements, color theory, craftsmanship, and technical skill in bead making is encouraged. The plan includes lesson goals and objectives; background preparation; a glossary of terms; a list of supplies; and…

  1. HANDI 2000 project execution plan

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00/Rev. 11, by integrating the major Hanford business processes and their supporting information systems

  2. Identifying different methods for creating knowledge from lessons learned in project oriented organizations

    Directory of Open Access Journals (Sweden)

    Ahmad Norang

    2016-01-01

    Full Text Available Nowadays, the increase in competition has increased the relative importance of innovation for most firms and many managers believe a good innovation must be knowledge oriented. This paper has tried to determine different methods for creating knowledge in project oriented organizations. The study designs a questionnaire in Likert scale and distributes it among 32 experts who were well informed about different methods of knowledge creation and lessons learned. Cronbach alphas for all components of the survey were well above the desirable level. The study has detected 11 methods for knowledge creation and lessons learned. In terms of preliminary assessment, business transactions has received the highest impact while knowledge team has received the highest effect in terms of necessary assessment. The results of this survey have indicated that although there are several methods for detecting knowledge within organizations, in most cases, it is not easy to gain value added knowledge within an organization, quickly. The people who participated in our survey have indicated that organizational commitment, brainstorming, Delphi and storytelling also have played important role for creation of knowledge. The results have also shown that brainstorming, knowledge brokers, map knowledge and work experience were easier to use for knowledge creation and lessons learned compared with other forms of knowledge creation.

  3. Comprehensive Evaluation of Large Infrastructure Project Plan with ANP

    Institute of Scientific and Technical Information of China (English)

    HAN Chuan-feng; CHEN Jian-ye

    2005-01-01

    Analytic Network Process(ANP) was used in comprehensive evaluation of large infrastructure project plan. A model including social economy, ecological environment, and resources was established with ANP method. The evaluation pattern of hierarchy structure and comprehensive evaluation method for quantity and quality of large infrastructure project were put forward, which provides an effective way to evaluate the large infrastructure project plan. Quantitative analysis indicated that the internal dependence relation of hierarchy structure has influence on ranking results of plan. It is suggested that considering the internal relation can helps managers make effective decisions.

  4. Planned Positron Factory project

    International Nuclear Information System (INIS)

    Okada, Sohei

    1990-01-01

    The Japan Atomic Energy Research Institute, JAERI, has started, drafting a construction plan for the 'Positron Factory', in which intense energy-controllable monoenergetic positron beams are produced from pair-production reactions caused by high-energy electrons from a linac. The JAERI organized a planning committee to provide a basic picture for the Positron Factory. This article presents an overview of the interactions of positrons, intense positron sources and the research program and facilities planned for the project. The interactions of positrons and intense positron sources are discussed focusing on major characteristics of positrons in different energy ranges. The research program for the Positron Factory is then outlined, focusing on advanced positron annihilation techniques, positron spectroscopy (diffraction, scattering, channeling, microscopy), basic positron physics (exotic particle science), and positron beam technology. Discussion is also made of facilities required for the Positron Factory. (N.K.)

  5. Defining a risk-informed framework for whole-of-government lessons learned: A Canadian perspective.

    Science.gov (United States)

    Friesen, Shaye K; Kelsey, Shelley; Legere, J A Jim

    Lessons learned play an important role in emergency management (EM) and organizational agility. Virtually all aspects of EM can derive benefit from a lessons learned program. From major security events to exercises, exploiting and applying lessons learned and "best practices" is critical to organizational resilience and adaptiveness. A robust lessons learned process and methodology provides an evidence base with which to inform decisions, guide plans, strengthen mitigation strategies, and assist in developing tools for operations. The Canadian Safety and Security Program recently supported a project to define a comprehensive framework that would allow public safety and security partners to regularly share event response best practices, and prioritize recommendations originating from after action reviews. This framework consists of several inter-locking elements: a comprehensive literature review/environmental scan of international programs; a survey to collect data from end users and management; the development of a taxonomy for organizing and structuring information; a risk-informed methodology for selecting, prioritizing, and following through on recommendations; and standardized templates and tools for tracking recommendations and ensuring implementation. This article discusses the efforts of the project team, which provided "best practice" advice and analytical support to ensure that a systematic approach to lessons learned was taken by the federal community to improve prevention, preparedness, and response activities. It posits an approach by which one might design a systematic process for information sharing and event response coordination-an approach that will assist federal departments to institutionalize a cross-government lessons learned program.

  6. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  7. Environmental assessment of nuclear projects in Canada - process, participation, lessons learned

    International Nuclear Information System (INIS)

    Underdown, G.A.; Brown, P.A.; Morrison, R.W.

    1995-01-01

    This paper documents public participation in decision-making for five cases of nuclear-based projects in Canada. Two cases involve the application of the Federal Environmental Assessment and Review Process (EARP), a formal, non-judicial process for public involvement in projects with a potential environmental impact. It is being applied to the development of new Uranium mines and the disposal of used nuclear fuels. The siting of radioactive waste facilities, generally unwanted by the communities, presents many difficult challenges which needs to be addressed before a project goes through the EARP process. An open, consultative, community-based approach to decision-making about siting is being applied in the three cases: Port Hope, Scarborough and Surrey. A number of lessons have been learned, the most important that there is a need to establish an acceptable process that includes 'getting the science right' on a project before attempting to find a site. The EARP, in most cases, provides a good mechanism for the sharing of information about a potential between the proponents and the public as long as there are no major unresolved contentious issues such as the unwanted siting of a waste facility in a particular community. 19 refs

  8. Definitions and Basic Concepts of Supply and Demand Analysis Used to Determine Market Equilibrium. Principles of Economics II (Microeconomics), Lesson Plan No. 6.

    Science.gov (United States)

    Chiu-Irion, Vicky

    Developed as part of a 37.5-hour microeconomics course, this lesson plan focuses on the concepts of supply and demand analysis used to determine market equilibrium. The objectives of the 50-minute lesson are to enable the student to: (1) explain how a demand schedule is derived from raw data; (2) graph a demand curve from the demand schedule; (3)…

  9. National Training Course. Emergency Medical Technician. Paramedic. Instructor's Lesson Plans. Module II. Human Systems and Patient Assessment.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This instructor's lesson plan guide on human systems and patient assessment is one of fifteen modules designed for use in the training of emergency medical technicians (paramedics). Four units are presented: (1) medical terminology, which covers some common prefixes and suffixes and the use of the medical dictionary; (2) an overview of the…

  10. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  11. The implementation of school-based lesson study at elementary school

    Directory of Open Access Journals (Sweden)

    Purnomo Purnomo

    2017-07-01

    Full Text Available This study aims to describe and interpret the implementation of school-based lesson study in SDN I Kretek. This study uses the qualitative research. The data were collected through in-depth interviews, participant observation, field notes, and documentation. The data validity was determined through sources and techniques triangulation. The data were analyzed using the Interactive Analysis Model from Miles and Huberman. The results show: (1 the planning of school-based lesson study program at SDN 1 Kretek has been implemented from the beginning of the school year 2014/2015 by establishing school-based lesson study team. This team is responsible for planning, managing, and evaluating school-based lesson study program at SDN 1 Kretek, (2 school-based lesson study at SDN 1 Kretek is implemented in three phases, namely planning, implementation, and reflection, and (3 The evaluation of lesson study is conducted by each teacher who has conducted the open class and conducted thoroughly with a meeting by a team of school-based lesson study SDN 1 Kretek at the end of the school year.

  12. Songs of the Universe - The AstroCappella Project

    Science.gov (United States)

    Boyd, P. T.; Smale, K. M.; Smale, A. P.

    2004-12-01

    The AstroCappella Project is a classroom-ready collection of upbeat pop songs, lesson plans, and background information, all rich in science content. It was developed as a collaboration between working research astronomers, educators, and a contemporary vocal band. A multimedia music CD ("AstroCappella 2.0") has been produced containing 13 astronomically correct songs with original lyrics and music. Song topics range from the Sun, Moon, planets and small bodies of the Solar System, through the Doppler shift, the nearest stars, and extra-solar planets, to radio astronomy, X-ray astronomy, and the Hubble Space Telescope and Swift astronomy satellites. The CD also contains extensive CD-ROM materials including science background information, curriculum notes, lesson plans and activities for each song, images, movies, and slide shows. The songs and accompanying information have been extensively field-tested, and align to the K-12 National Science Education Standards. The AstroCappella materials are in widespread use in classrooms and homes across the US, and are supplemented with frequent live performances and teacher workshops. We describe here the history, content, and educational strategy behind the AstroCappella Project, and the plans for its future development.

  13. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  14. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  15. Refining MARGINS Mini-Lessons Using Classroom Observations

    Science.gov (United States)

    Iverson, E. A.; Manduca, C. A.; McDaris, J. R.; Lee, S.

    2009-12-01

    One of the challenges that we face in developing teaching materials or activities from research findings is testing the materials to determine that they work as intended. Traditionally faculty develop material for their own class, notice what worked and didn’t, and improve them the next year. However, as we move to a community process of creating and sharing teaching materials, a community-based process for testing materials is appropriate. The MARGINS project has piloted such a process for testing teaching materials and activities developed as part of its mini-lesson project (http://serc.carleton.edu/margins/index.html). Building on prior work developing mechanisms for community review of teaching resources (e.g. Kastens, 2002; Hancock and Manduca, 2005; Mayhew and Hall, 2007), the MARGINS evaluation team developed a structured classroom observation protocol. The goals of field testing are to a) gather structured, consistent feedback for the lesson authors based on classroom use; b) guide reviewers of these lessons to reflect on research-based educational practice as a framework for their comments; c) collect information on the data and observations that the reviewer used to underpin their review; d) determine which mini-lessons are ready to be made widely available on the website. The protocol guides faculty observations on why they used the activity, the effectiveness of the activity in their classroom, the success of the activity in leading to the desired learning, and what other faculty need to successfully use the activity. Available online (http://serc.carleton.edu/margins/protocol.html), the protocol can be downloaded and completed during instruction with the activity. In order to encourage review of mini-lessons using the protocol, a workshop focused on review and revision of activities was held in May 2009. In preparation for the workshop, 13 of the 28 participants chose to field test a mini-lesson prior to the workshop and reported that they found this

  16. The Groundwater Performance Assessment Project Quality Assurance Plan

    International Nuclear Information System (INIS)

    Luttrell, Stuart P.

    2006-01-01

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan

  17. 7 CFR 1250.314 - Plans and projects.

    Science.gov (United States)

    2010-01-01

    ... research, consumer and producer education, advertising, marketing, product development, and promotion plans... 7 Agriculture 10 2010-01-01 2010-01-01 false Plans and projects. 1250.314 Section 1250.314 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING...

  18. Nuclear critics and nuclear controversy: Lessons for the next 50 years

    International Nuclear Information System (INIS)

    Perkins, B.

    1992-01-01

    For more than a decade, nuclear electric power was at the center of one of the most widespread and passionate controversies in the United States. A combination of local community groups and a sophisticated national opposition seriously delayed nuclear plants being built in state after state, contributing to major cost increases and, in some instances, project cancellations. According to plans of the US government and electric power industry, new nuclear power plants will be ordered by the mid-1990s and will be in operation around the turn of the century. The success of these plans will depend in part on how well the government and industry learned the lessons of the years of controversy - how well they can rally public support despite the inevitable opposition of nuclear critics. This paper is based on a review of the national nuclear controversy of the 1970s and early 1980s. It analyzes the key lessons to be learned from those experiences and projects them onto the new societal and political setting of the 1990s, reflecting more recent research into effective siting procedures, public participation, risk communications, and other disciplines related to the development of public acceptance for nuclear power plants

  19. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    International Nuclear Information System (INIS)

    Jones, M.E.; Shain, D.I.

    1994-01-01

    The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition are all needed. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates and is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remediation activity. However, risks from all of the remediation activities, decontamination and decommissioning activities, and normal ongoing operations are imposed upon the Rocky Flats workers, the surrounding public, and the environment. Comparative Risk Analysis will provide risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures by focusing these resources on the largest risks first. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. The Comparative Risk Analysis methodology Group, consisting of community stakeholders, was established. Early stakeholder involvement in the risk analysis methodology development provides an opportunity for stakeholders to influence the risk information delivered to a decision-maker. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges

  20. Guidance and Control Software Project Data - Volume 1: Planning Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  1. H2020 692819 SIMPATICO - D1.1: Project Management Plan

    OpenAIRE

    Forner, Pamela; Gerosa, Matteo; Folograna, Antonio

    2017-01-01

    This document is the deliverable “D1.1 – Project Management Plan” of the European project “SIMPATICO - SIMplifying the interaction with Public Administration Through Information technology for Citizens and cOmpanies” (hereinafter also referred to as “SIMPATICO”, project reference: 692819). The SIMPATICO Project Management Plan (PMP) is the main planning document and describes how major aspects of the project are managed, monitored and controlled. It is intended to provide gu...

  2. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  3. Code of Conduct for wind-power projects - Phases 1 and 2; Code of Conduct fuer windkraftprojekte. Phase 1 und 2 - Systemanalyse, Lessons Learned und Bewertung bestehender Instrumente

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-08-15

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  4. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  5. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  6. Project Management Plan for the INEL technology logic diagrams

    International Nuclear Information System (INIS)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project

  7. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  8. Strategic plan: A tool to improve IPP project earnings

    International Nuclear Information System (INIS)

    LeClerc, S.

    1997-01-01

    This paper presents a strategic plan to analyze and convert project operations to gain short-term and long-term economic benefits. Areas of Opportunity were identified which may result in improved project economics from Independent Power Producers' project reviews. This paper discusses each Area of Opportunity, suggests options for investigation, and provides a potential magnitude of upside for solid fuel circulating fluidized bed projects in the 50 MW project size. The Areas of Opportunity are: (1) Power Purchase Agreement Modifications; (2) Fuel Use Optimization; (3) Power Plant Upgrades; (4) Power Plant Depreciation Schedule And FAS 121 Analysis; (5) Operation ampersand Maintenance Review; (6) Financial Contract Review; (7) Environmental Review; (8) Insurance Coverage Review; (9) Internal Management Review; and (10) Strategic Development For Energy Sales. Ten appendices are included which comprise a sample Strategic Plan: (1) Potential Plant Upgrades, (2) Enhancement Criteria, (3) Age of Coal Burning Plants, (4) Btu Energy Price Summary, (5) Typical Operation and Maintenance Audit Findings, (6) Typical Performance Objectives and Guidelines, (7) Typical Heavy Metal Emissions, (8) Typical Strategic Plan Formulation, (9) Strategic Plan Implementation Schedule, and (10) Typical Decision Tree. 8 refs

  9. Managing the continuum certainty, uncertainty, unpredictability in large engineering projects

    CERN Document Server

    Caron, Franco

    2013-01-01

    The brief will describe how to develop a risk analysis applied to a project , through a sequence of steps: risk management planning, risk identification, risk classification, risk assessment, risk quantification, risk response planning, risk monitoring and control, process close out and lessons learning. The project risk analysis and management process will be applied to large engineering projects, in particular related to the oil and gas industry. The brief will address the overall range of possible events affecting the project moving from certainty (project issues) through uncertainty (project risks) to unpredictability (unforeseeable events), considering both negative and positive events. Some quantitative techniques (simulation, event tree, Bayesian inference, etc.) will be used to develop risk quantification. The brief addresses a typical subject in the area of project management, with reference to large engineering projects concerning the realization of large plants and infrastructures. These projects a...

  10. Mathematics teachers’ reflective practice within the context of adapted lesson study

    Directory of Open Access Journals (Sweden)

    Barbara Posthuma

    2012-11-01

    Full Text Available There seems to be paucity of research in South Africa on mathematics teachers’ reflective practice. In order to study this phenomenon, the context of lesson study (in an adapted form was introduced to five mathematics teachers in a rural school in the Free State. The purpose was to investigate their reflective practice whilst they collaboratively planned mathematics lessons and reflected on the teaching of the lessons. Data were obtained through interviews, video-recorded lesson observations, field notes taken during the lesson study group meetings and document analyses (lesson plans and reflective writings. The adapted lesson study context provided a safe space for teachers to reflect on their teaching and they reported an increase in self-knowledge and finding new ways of teaching mathematics to learners. This finding has some potential value for planning professional learning programmes in which teachers are encouraged to talk about their classroom experiences, share their joys and challenges with one another and strive to build a community of reflective practitioners to enhance their learners’ understanding of mathematics.

  11. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  12. Resettling refugees and safeguarding their mental health: lessons learned from the Canadian Refugee Resettlement Project.

    Science.gov (United States)

    Beiser, Morton

    2009-12-01

    The Ryerson University Refugee Resettlement Project (RRP), a decade-long study of 1348 Southeast Asian refugees who came to Canada between 1979 and 1981, is one of the largest, most comprehensive and longest-lived investigations of refugee resettlement ever carried out. Knowledge gleaned from the RRP about research methodology, about the resettlement experience, about the social costs of resettling refugees, about factors that promote or hinder integration, about risk and protective factors for refugee mental health, and about the refugees' consumption of mental health and social services is summarized in the form of 18 "Lessons." The lessons are offered in order to encourage and stimulate further research, as well to suggest policy and practice innovations that could help make resettlement easier, less costly, more effective, and more humane.

  13. Lessons and challenges from adaptation pathways planning applications

    Science.gov (United States)

    Haasnoot, M.; Lawrence, J.; Kwakkel, J. H.; Walker, W.; Timmermans, J.; Bloemen, P.; Thissen, W.

    2015-12-01

    Planning for adaptation to dynamic risks (e.g., because of climate change) is a critical need. The concept of 'adaptive policies' is receiving increasing attention as a way of performing strategic planning that is able to address many of the inherent challenges of uncertainty and dynamic change. Several approaches for developing adaptive policies are available in the literature. One approach, for which several applications already exist, is Dynamic Adaptive Policy Pathways (DAPP). Pathway maps enable policy analysts, decision makers, and stakeholders to recognize potential 'locked-in' situations and to assess the flexibility, robustness, and efficacy of decision alternatives. Most of the applications of DAPP have been in deltas, coastal cities, or floodplains, often within the context of climate change adaptation. In this talk, we describe the DAPP approach and present a framework for designing signposts as adaptation signals, together with an illustrative application for the Rhine River in the Netherlands. We also draw lessons and challenges from pathways applications that differ in environment, culture, and institutional context. For example, the Dutch Delta Programme has used pathways to identify short-term decisions and long-term policy options. In Bangladesh, an application is in its early phase. Steps before generating pathways - such as long- term thinking in multiple possible futures and acknowledging uncertainties - are already a big challenge there. In New Zealand, the 'Sustainable Delta Game' has been used as the catalyst for pathways thinking by two local councils. This has led to its application in decision making for coastal and flood risk management and economic analysis of policy options.

  14. Effects of Multiple Intelligences Supported Project-Based Learning on Students' Achievement Levels and Attitudes towards English Lesson

    Science.gov (United States)

    Bas, Gökhan; Beyhan, Ömer

    2010-01-01

    The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students' achievement and their attitude towards English lesson. The research was carried out in 2009-2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary…

  15. Optimization education after project implementation: sharing "lessons learned" with staff.

    Science.gov (United States)

    Vaughn, Susan

    2011-01-01

    Implementations involving healthcare technology solutions focus on providing end-user education prior to the application going "live" in the organization. Benefits to postimplementation education for staff should be included when planning these projects. This author describes the traditional training provided during the implementation of a bar-coding medication project and then the optimization training 8 weeks later.

  16. Project X Accelerator R and D Plan

    International Nuclear Information System (INIS)

    2008-01-01

    Project X is a high intensity proton facility conceived to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report. Project X is based on an 8 GeV superconducting H-linac, paired with the existing (but modified) Main Injector and Recycler Ring, to provide in excess of 2 MW of beam power throughout the energy range 60-120 GeV, simultaneous with at least 100 kW of beam power at 8 GeV. The linac utilizes technology in common with the ILC over the energy range 0.6-8.0 GeV. Beam current parameters can be made identical to ILC resulting in identical rf generation and distribution systems. This alignment of ILC and Project X technologies allows for a shared development effort. The initial 0.6 GeV of the linac draws heavily on technology developed by Argonne National Laboratory for a facility for rare isotope beams. It is anticipated that the exact configuration and operating parameters of the linac will be defined through the R and D program and will retain alignment with the ILC plan as it evolves over this period. Utilization of the Recycler Ring as an H - stripper and accumulator ring is the key element that provides the flexibility to operate the linac with the same beam parameters as the ILC. The linac operates at 5 Hz with a total of 5.6 x 10 13 H - ions delivered per pulse. H - are stripped at injection into the Recycler in a manner that 'paints' the beam both transversely and longitudinally to reduce space charge forces. Following the 1 ms injection, the orbit moves off the stripping foil and circulates for 200 msec, awaiting the next injection. Following three such injections a total of 1.7 x 10 14 protons are transferred in a single turn to the Main Injector. These protons are then accelerated to 120 GeV and fast extracted to a neutrino target. The Main Injector cycle takes 1.4 seconds, producing approximately 2

  17. Lessons learned from the PMI case study: the community perspective.

    Science.gov (United States)

    Hare, M L; Orians, C E; Kennedy, M G; Goodman, K J; Wijesinha, S; Seals, B F

    2000-03-01

    This summary report presents the lessons learned during the two-part qualitative case study on the efficacy of the Prevention Marketing Initiative (PMI) in its implementation of an HIV prevention program. About 179 community participants were included in the PMI program, which discussed topics ranging from organizing initial planning committees to financially sustaining federal demonstration programs. One of the successes observed was the development of rapport with schools and churches; however, during the course of its implementation, the program realized the necessity of 1) approaching the program as an ongoing process; 2) going beyond studying the target population through formative research; 3) changing the role of a community coalition as the project matures; 4) reexamining the composition of coalition in the light of the target audience; 5) advocating the project as a community resource that promotes collaboration; 6) attending the needs of coalition members; and 7) using the media in the campaign. Likewise, several lessons were also learned in the areas of youth involvement, intervention development, program implementation, and maintenance of PMI activities.

  18. Project Rulison: post-shot plans and evaluations

    Energy Technology Data Exchange (ETDEWEB)

    1969-12-01

    Project Rulison post-shot plans and evaluations are discussed and include physical characteristics of the Rulison cavity; pressure and temperature expected in the cavity; amount, nature, and distribution of radioactivity in the cavity; reentry plan; radioactive species which may be encountered during reentry; public safety considerations arising from release of radioactivity; procedures to assure public safety; and the radiological safety plan. Maximum hypothetical accidents and ecological considerations are discussed in the appendices.

  19. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  20. TRAINING FUTURE TEACHERS OF COMPUTER SCIENCE FOR WORKING OUT TECHNOLOGICAL CARDS OF LESSONS IN THE CONDITIONS OF REALIZATION OF THE FEDERAL STATE EDUCATIONAL STANDARD FOR GENERAL EDUCATION

    Directory of Open Access Journals (Sweden)

    Екатерина Николаевна Кувшинова

    2017-12-01

    Full Text Available This article is devoted to a problem of readiness of future teachers of informatics for development of flow charts of the lessons displaying the main requirements of Federal state educational standards of the main general education (FGOS of Ltd company to planning and the organization of educational process taking into account system and activity approach in training. Content of system and activity approach in training, the universal educational actions (UEA reveals. Main units of the flow chart of a lesson of informatics are considered. The substantial block of the flow chart of a lesson of informatics determined by a training material which provides achievement of the planned subject results of training, and also forming and development of UUD, all-educational skills, ICT competences, competences of educational and research and project activities is stated.Subject results of training to which the abilities specific to a subject, types of activity on receipt of new knowledge within a subject, to its transformation and application in educational, educational and project and social and project situations, forming of scientific type of thinking, scientific ideas of key theories, types and types of the relations, ownership of scientific terminology, key concepts, methods and acceptances belong [10] are analyzed.Step-by-step training of future teachers of informatics for development of flow charts of lessons is discussed.

  1. Planning and management for reactor decommissioning

    International Nuclear Information System (INIS)

    Miyasaka, Yasuhiko

    2001-01-01

    This report describes decommissioning strategy, planning process, regulation, management and organization, radiological characterization and safety. Planning is used to identify, define and organize the requirements for decommissioning including decommissioning options, items to be accomplished (objective, scope), to solve problems of how it is to be accomplished (methods, means and procedures), questions of who will execute it (resources, organization and responsibilities, interfacing), and time when it will be executed (schedule for meeting the objectives). A plan is highly dependent on the quality of the management team assembled to carry it out. Radiological characterization involves a survey of existing data, calculation, in situ measurements and/or sampling and analyses. Using this databases decommissioning planner may assess options, considering: decontamination processes, dismantling procedures, tools required, radiological protection of workers and public/environment, waste classification, and resulting costs. Comparison and optimization of these factors will lead to selection of a decommissioning strategy, i.e. typically, immediate or deferred dismantling. The planning and implementation of decommissioning for nuclear reactors should be referred both recent dismantling techniques and many decommissioning experiences. The technical lessons learned from many projects will help in the planning for future decommissioning projects. And systematic planning and management are essential to successful completion of a decommissioning project. (author)

  2. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    International Nuclear Information System (INIS)

    Shank, D.R.

    1994-01-01

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium

  3. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  4. Spent nuclear fuel project high-level information management plan

    Energy Technology Data Exchange (ETDEWEB)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  5. GATEWAY Demonstrations: Exterior LED Lighting Projects at Princeton University

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Evans, WIlliam E. [Princeton Univ., NJ (United States); Murphy, Arthur [Princeton Univ., NJ (United States); Perrin, Tess [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-10-30

    This report focuses on four exterior solid-state lighting projects that have been completed at Princeton since 2008, when the University adopted a comprehensive sustainability plan. Through these initial projects – which include a parking garage, a pedestrian path, and two parking lot installations – the school’s facilities engineering staff learned important lessons about SSL technology and gained experience in dealing with the rapidly changing landscape of lighting manufacturers and their suppliers.

  6. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  7. National Ignition Facility project acquisition plan revision 1

    International Nuclear Information System (INIS)

    Clobes, A.R.

    1996-01-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager

  8. Spring Chinook Supplementation Monitoring; Yakima Fisheries Project Management Plan, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A. (Washington Department of Fish and Wildlife, Olympia, WA); Watson, Bruce; Johnston, Mark (Confederated Tribes and Bands of the Yakama Nation, Fisheries Resource Management, Toppenish, WA)

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.

  9. Oracle accrual plans from requirements to implementation

    Energy Technology Data Exchange (ETDEWEB)

    Rivera, Christine K [Los Alamos National Laboratory

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  10. Lessons learned from the shut down, planning, and the preparatory activities of decommissioning the research reactor VVR-S Magurele, Bucharest

    International Nuclear Information System (INIS)

    Dragusin, M.; Copaciu, V.

    2006-01-01

    The nuclear research reactor type VVR was shut down in December 1997 after forty years of operation. The main characteristics of this reactor are: Thermal power 2 MW, Thermal energy - 9.59 GWhd, Average flux of thermal neutrons-10 13 n/cm 2 .s, nine horizontal channels, sixteen vertical exposure channels, three biological channels, reactor type tank, water used as a moderator, coolant and reflector. The reactor was used in research and radioisotope production. The reactor has been permanently shut down since April 2002, when the decommissioning was officially announced. Discussions regarding funding mechanisms for the conservation phase, and decommissioning (planning, preparatory activities, spent nuclear fuel management), have taken place since five years ago when the final decision of permanent shut down was taken. Quality management includes procedures for recording and archiving the lessons learned. The planning of decommissioning started in 1990 when the reactor was still operational. After fifteen years the regulatory body has not yet approved the decommissioning plan for the reactor. In this paper the following aspects are discussed: decommissioning strategy from safe enclosure to immediate dismantling, specific features of the site (treatment of radioactive waste near reactor) and state of decommissioning, use of the lessons learned in the planning of decommissioning for the other two small nuclear facilities situated in the same area with VVR-reactor: Sub critical Assembly 'HELEN' and Zero Power Critical Reactor RP-0, AFR ponds for spent nuclear fuel, other radiological facilities for radioisotopes production facilities radiation processing and accelerators. Preparatory activities for decommissioning have included: elaboration of a plan (inter alia, justification of the selected strategy, management of the radioactive waste in accordance with the waste acceptance criteria), reactor storage in parallel with the removal of the equipment and materials used in

  11. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  12. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  13. First-of-A-Kind Control Room Modernization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-02-01

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

  14. Resource Constrained Planning of Multiple Projects with Separable Activities

    Science.gov (United States)

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  15. National planning guidelines for environment ally sustainable development in Scotland and lessons learnt for Pakistan

    International Nuclear Information System (INIS)

    Qamar-ul-Islam; Anjum, G.A.; Shahzad, M.

    2005-01-01

    This piece of research work reflects the researcher's academic as well as the practical experiences of Scottish planning about the concept, issues and policy formulations. It is in the context of National Planning Policy Guidelines, originated in Scotland with particular reference to it's Fife Region. The first part reflects the general overview of Scotland followed by brief description of the region. Another part deals with the existing strategic issues in the region which are related to land and the environment notably rural planning priorities, agricultural scarce land, conservation of recreational and tourist areas, forest land potentials, landscape resources, national scenic areas, petro-chemical, industrial zones, river pollution and future land use for housing. This study has suggested National Planning Policy Guidelines to these issues. Last section deals with the lessons learnt from Scotland and appropriate application of these guidelines in case of Pakistan. The establishment of the relevant National Planning Guidelines according to our local environmental and socio-economic conditions can also play a significant role to safe guard our rural and urban landscapes and their respective environments. These broad guidelines must therefore be recommended in the broader spectrum in spatial linkage. Moreover these guidelines must therefore synthesize and articulated specifically at structure plans, master plans at district, sub district or local plans and planning processes which can lead Pakistan towards environmentally sustainable development. (author)

  16. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  17. Quinault Indian Nation Comprehensive Biomass Strategic Planning Project

    Energy Technology Data Exchange (ETDEWEB)

    Cardenas, Jesus [American Community Enrichment, Elma, WA (United States)

    2015-03-31

    The overall purposes of the Quinault Indian Nation’s Comprehensive Biomass Strategic Planning Project were to: (1) Identify and confirm community and tribal energy needs; (2) Conducting an inventory of sustainable biomass feedstock availability; (3) Development of a biomass energy vision statement with goals and objectives; (4) Identification and assessment of biomass options for both demand-side and supply side that are viable to the Quinault Indian Nation (QIN); and (5) Developing a long-term biomass strategy consistent with the long-term overall energy goals of the QIN. This Comprehensive Biomass Strategic Planning Project is consistent with the QIN’s prior two-year DOE Renewable Energy Study from 2004 through 2006. That study revealed that the most viable options to the QIN’s renewable energy options were biomass and energy efficiency best practices. QIN's Biomass Strategic Planning Project is focused on using forest slash in chipped form as feedstock for fuel pellet manufacturing in support of a tribal biomass heating facility. This biomass heating facility has been engineered and designed to heat existing tribal facilities as well as tribal facilities currently being planned including a new K-12 School.

  18. Lessons from Iowa : development of a 270 megawatt compressed air energy storage project in midwest Independent System Operator : a study for the DOE Energy Storage Systems Program.

    Energy Technology Data Exchange (ETDEWEB)

    Holst, Kent (Iowa Stored Energy Plant Agency, Traer, IA); Huff, Georgianne; Schulte, Robert H. (Schulte Associates LLC, Northfield, MN); Critelli, Nicholas (Critelli Law Office PC, Des Moines, IA)

    2012-01-01

    The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

  19. A framework for considering climate change in transportation and land use scenario planning : lessons learned from an interagency pilot project on Cape Cod.

    Science.gov (United States)

    2011-07-01

    The Interagency Transportation, Land Use, and Climate Change Pilot Project utilized a scenario planning process to develop a multi-agency transportation- and land use-focused development strategy for Cape Cod, Massachusetts, with the intention of ach...

  20. A Qualitative Study on Primary School Mathematics Lesson Evaluation

    Science.gov (United States)

    Zhao, Dongchen; Ma, Yunpeng

    2009-01-01

    Through the qualitative interviews of five implementers of primary school mathematics curriculum, this study addresses the ways in which mathematics lessons are evaluated. Results show that each evaluator recognizes different aspects of a "good lesson," however, among all criteria, the design of the lesson plan, realization of the lesson…

  1. Transuranic (TRU) Waste Phase I Retrieval Plan

    CERN Document Server

    McDonald, K M

    2000-01-01

    From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A1, the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-113 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval ...

  2. Fast Flux Test Facility project plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  3. Fast Flux Test Facility project plan. Revision 2

    International Nuclear Information System (INIS)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  4. The SeaView EarthCube project: Lessons Learned from Integrating Across Repositories

    Science.gov (United States)

    Diggs, S. C.; Stocks, K. I.; Arko, R. A.; Kinkade, D.; Shepherd, A.; Olson, C. J.; Pham, A.

    2017-12-01

    SeaView is an NSF-funded EarthCube Integrative Activity Project working with 5 existing data repositories* to provide oceanographers with highly integrated thematic data collections in user-requested formats. The project has three complementary goals: Supporting Scientists: SeaView targets scientists' need for easy access to data of interest that are ready to import into their preferred tool. Strengthening Repositories: By integrating data from multiple repositories for science use, SeaView is helping the ocean data repositories align their data and processes and make ocean data more accessible and easily integrated. Informing EarthCube (earthcube.org): SeaView's experience as an integration demonstration can inform the larger NSF EarthCube architecture and design effort. The challenges faced in this small-scale effort are informative to geosciences cyberinfrastructure more generally. Here we focus on the lessons learned that may inform other data facilities and integrative architecture projects. (The SeaView data collections will be presented at the Ocean Sciences 2018 meeting.) One example is the importance of shared semantics, with persistent identifiers, for key integration elements across the data sets (e.g. cruise, parameter, and project/program.) These must allow for revision through time and should have an agreed authority or process for resolving conflicts: aligning identifiers and correcting errors were time consuming and often required both deep domain knowledge and "back end" knowledge of the data facilities. Another example is the need for robust provenance, and tools that support automated or semi-automated data transform pipelines that capture provenance. Multiple copies and versions of data are now flowing into repositories, and onward to long-term archives such as NOAA NCEI and umbrella portals such as DataONE. Exact copies can be identified with hashes (for those that have the skills), but it can be painfully difficult to understand the processing

  5. Amish-Initiated Burn Care Project: Case Report and Lessons Learned in Participatory Research.

    Science.gov (United States)

    Hess, Rosanna F

    2017-03-01

    This case report describes the phases of an Amish Burn Care Project and the lessons learned throughout the process. Data sources to construct the case report included participant observation, interviews, archival documents, and a focus group. The narrative is organized into five phases of a participatory research approach: engagement, formalization, mobilization, maintenance, and expansion. Community-initiated research led to legitimate change, working together for change took time, team members grew in mutual trust and respect for each other, cultural humility brought personal and professional growth, and capacity building took place through mutually supported efforts.

  6. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  7. Upper School Maths: Lesson Plans and Activities for Ages 9-11 Years. Series of Caribbean Volunteer Publications, No. 9.

    Science.gov (United States)

    Voluntary Services Overseas, Castries (St. Lucia).

    This collection of lesson plans and activities for students aged 9-11 years is based on a science curriculum developed by a group of Caribbean nations. The activities pertain to topics such as place value, prime and composite numbers, the sieve of Eratosthenes, square numbers, factors and multiples, sequences, averages, geometry, symmetry,…

  8. Quality assurance program plan for cesium legacy project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents

  9. Lessons learned about coordinating academic partnerships from an international network for health education.

    Science.gov (United States)

    Luo, Airong; Omollo, Kathleen Ludewig

    2013-11-01

    There is a growing trend of academic partnerships between U.S., Canadian, and European health science institutions and academic health centers in low- and middle-income countries. These partnerships often encounter challenges such as resource disparities and power differentials, which affect the motivations, expectations, balance of benefits, and results of the joint projects. Little has been discussed in previous literature regarding the communication and project management processes that affect the success of such partnerships. To fill the gap in the literature, the authors present lessons learned from the African Health Open Educational Resources Network, a multicountry, multiorganizational partnership established in May 2008. The authors introduce the history of the network, then discuss actively engaging stakeholders throughout the project's life cycle (design, planning, execution, and closure) through professional development, relationship building, and assessment activities. They focus on communication and management practices used to identify mutually beneficial project goals, ensure timely completion of deliverables, and develop sustainable sociotechnical infrastructure for future collaborative projects. These activities yielded an interactive process of action, assessment, and reflection to ensure that project goals and values were aligned with implementation. The authors conclude with a discussion of lessons learned and how the partnership project may serve as a model for other universities and academic health centers in high-income countries and low- and middle-income countries that are interested in or currently pursuing international academic partnerships.

  10. Fernald closure project - Lessons learned in the execution of this successful project, completed October 2006

    International Nuclear Information System (INIS)

    Murphy, Cornelius; Reising, Johnny

    2007-01-01

    Available in abstract form only. Full text of publication follows: This paper explores the history and lessons learned on the United States' Department of Energy's (DoE's) Fernald Closure Project - from the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies that were achieved. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion dollar mega environmental-remediation project that was completed in October 2006. During a period of nearly 37 years, Fernald produced 250,000 tons of high-purity, low-enriched uranium for the U.S. defense program, generating more than six million tons of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. The project comprised four phases: 1. Determining the extent of damage to the environment and groundwater at, and adjacent to, the production facilities 2. Selecting cleanup criteria - final end states that had to be met to protect human health and the environment 3. Selecting and implementing the remedial actions that would meet the cleanup goals 4. Doing the work safely, compliantly and cost-effectively. In the project's early stages, there were strained relationships and total distrust between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. (authors)

  11. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  12. AMADEUS Project Deliverable 1.2: Data Management Plan

    OpenAIRE

    Ana Belén Cristobal

    2018-01-01

    This document describes the initial Data Management Plan (DMP) for AMADEUS project. It addresses Project administration data collected as part of the execution and management of a disruptive research that could be in the market in the incoming years.

  13. "Hamlet" Meets "Chushingura": Traditions of the Revenge Tragedy. [Lesson Plan].

    Science.gov (United States)

    2002

    This lesson seeks to sensitize students to the similarities and difference between cultures by comparing the Shakespearean and the Bunraki/Kabuki dramas of Japan. In the lesson, the focus of this comparison is the complex nature of revenge explored in "The Tragedy of Hamlet, Prince of Denmark" and "Chusingura," or "The…

  14. You plan, you test and then it happens: Lessons learned from the Schneider warehouse tornado recovery.

    Science.gov (United States)

    Marotz, William T

    2017-12-01

    This paper is about the experience gained and lessons learned while dealing with the long-term recovery of Schneider's Port Logistics Division following extensive damage to three warehouse/ office facilities in Savannah, GA on 25th April, 2015. This paper will provide insight into how the initial assessments were handled, how the skill sets needed by the response teams were determined, and what further actions were triggered as more detailed information was received and assessed by the leadership team. This paper will also provide information as to how closely the company followed its existing contingency and disaster recovery plans, as well as where those plans fell short and where it was necessary to make adjustments as the recovery progressed.

  15. Wind energy planning in England, Wales and Denmark: Factors influencing project success

    International Nuclear Information System (INIS)

    McLaren Loring, Joyce

    2007-01-01

    Land-use planning poses a significant barrier to the further development of on-shore wind energy in many countries. There has been increasing discussion regarding the use of public participation in the planning process in order to address concerns of local residents and ease conflicts. This research explores the dynamics of the planning process for wind energy in England, Wales and Denmark in order to better understand the factors influencing project success. Through 18 in-depth case studies, it investigates the degree of local community participation in the planning process and the stability of the network of individuals and organisations involved in the project to determine their relationship to the public's acceptance of the project and the planning outcome. The study draws on the frameworks of public participation in planning and actor-network theories in order to develop indicators of the level of community involvement and network formation for each case. The analysis discusses predictions made by the theoretical approaches as to the importance of these variables to the success of new projects. The results indicate that projects with high levels of participatory planning are more likely to be publicly accepted and successful. In addition, stable supporting networks are more likely to form. The presence of a stable network of supporters is not found to be related to project acceptance and success; however, the absence of a stable network of opponents is found to be necessary for project acceptance and success in receiving planning permission

  16. Tunneling on the Yucca Mountain Project: Progress and lessons learned

    International Nuclear Information System (INIS)

    Hansmire, W.H.; Rogers, D.J.; Wightman, W.D.

    1996-01-01

    The Yucca Mountain Site Characterization Project is the US's effort to confirm the technical acceptability of Yucca Mountain as a repository for high-level nuclear waste. A key part of the site characterization project is the construction of a 7.8-km-long, 7.6-m-diameter tunnel for in-depth geologic and other scientific investigations. The work is governed in varying degrees by the special requirements for nuclear quality assurance, which imposes uncommon and often stringent limitations on the materials which can be used in construction, the tunneling methods and procedures used, and record-keeping for many activities. This paper presents the current status of what has been learned, how construction has adapted to meet the requirements, and how the requirements were interpreted in a mitigating way to meet the legal obligations, yet build the tunnel as rapidly as possible. With regard to design methodologies and the realities of tunnel construction, ground support with a shielded Tunnel Boring Machine is discussed. Notable lessons learned include the need for broad design analyses for a wide variety of conditions and how construction procedures affect ground support

  17. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  18. Using "Petites Projects" to Further Engage Students in Geography

    Science.gov (United States)

    Katz, Richard

    2013-01-01

    The challenge of teaching AP Human Geography to high school students is to make geography relevant, engaging and "real world." Often the pace of teaching AP classes constrains the ability of teachers to do creative projects and truly engage students until after the exam is over in May. In this lesson plan, the author suggests using "Petites…

  19. Achieving Smart Energy Planning Objectives. The Approach of the Transform Project

    Directory of Open Access Journals (Sweden)

    Ilaria Delponte

    2014-05-01

    Full Text Available Cities play a dual role in the field of energy and integrated planning. They function as institutional planning and decision making bodies and interfere as actors, e.g. as project developers or launching customers. In the first case their attempts at integrated plans are often unsuccessful in integrating vision, goals and instruments of all stakeholders so that waste, water, energy cycles, urban planning and budgets proceed with no connection to each other.  TRANSFORM Project “Transformation Agenda for Low Carbon Cities” (FP7 tries to improve the integrated energy policy and decision making process of cities, both at a strategic and operational level, by providing the cities with a framework based on overall planning experiences and on-the-field projects and qualitative and quantitative analysis support models. The project intends also to make a step further in the quality of research, by providing a replicable and tested framework for the production of a strategic Transformation Agenda for the city as a whole, combined with district Implementation Plans.

  20. 78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability

    Science.gov (United States)

    2013-10-24

    ... disadvantages of current and emerging alternatives for the exchange of regulated study data, and (2) issuing a... primary document for guiding all major aspects of FDA's multi-year initiative to develop and implement TA... is announcing the availability of the TA Project Plan. This TA Project Plan will be the primary...

  1. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  2. Strategic planning for remediation projects

    International Nuclear Information System (INIS)

    Tapp, J.W.

    1995-01-01

    Remediation projects may range from a single leaking storage tank to an entire plant complex or producing oil and gas field. Strategic planning comes into play when the contamination of soil and groundwater is extensive. If adjacent landowners have been impacted or the community at large is concerned about the quality of drinking water, then strategic planning is even more important. (1) To manage highly complex interrelated issues--for example, the efforts expended on community relations can alter public opinion, which can impact regulatory agency decisions that affect cleanup standards, which can...and so on. (2) To ensure that all potential liabilities are managed--for example, preparation for the defense of future lawsuits is essential during site investigation and remediation. (3) To communicate with senior management--when the remediation team provides a strategic plan that includes both technical and business issues, senior management has the opportunity to become more involved and make sound policy decisions. The following discusses the elements of a strategic plan, who should participate in it, and the issues that should be considered

  3. Evolution of project planning tools in a matrix organization

    Energy Technology Data Exchange (ETDEWEB)

    Furaus, J.P.; Figueroa-McInteer, C.; McKeever, P.S.; Wisler, D.B. [Sandia National Labs., Albuquerque, NM (United States); Zavadil, J.T. [Infomatrix (United States)

    1996-10-01

    Until recently, the Corporate Construction Program at Sandia was experiencing difficulties in managing projects: poor planning and cost estimating caused schedule and budget problems. The first step taken was a Microsoft {reg_sign} Project schedule that provides a standard template for scheduling individual construction projects. It is broken down according to the life cycle of the project and prevents the project team from leaving out an important item. A WBS (work breakdown structure) dictionary was also developed that describes how capital and operating funds are used to develop, design, construct, equip, and manage projects. We also developed a matrix chart that maps the planning guide against the major types of construction projects at Sandia. The guide, dictionary, and matrix chart offer enough flexibility that the project manager can make choices about how to structure work, yet ensure that all work rolls up to the cost categories and key DOE WBS elements. As requirements change, the tools can be updated; they also serve as training tools for new project team members.

  4. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  5. Solid waste information and tracking system server conversion project management plan

    International Nuclear Information System (INIS)

    MAY, D.L.

    1999-01-01

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents

  6. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Leus, R.; Wullink, Gerhard; Hans, Elias W.; Herroelen, W.

    2004-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. A positioning framework is proposed to distinguish between different types of project-driven organisations, which is meant to aid project management in the choice between the

  7. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Hans, Elias W.; Herroelen, W.; Wullink, Gerhard; Leus, R.

    2007-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. Based on these viewpoints we propose a positioning framework to distinguish between different types of project-driven organisations. This framework is meant to aid project

  8. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  9. Plan for 3-D full-scale earthquake testing facility

    International Nuclear Information System (INIS)

    Ohtani, K.

    2001-01-01

    Based on the lessons learnt from the Great Hanshin-Awaji Earthquake, National Research Institute for Earth Science and Disaster Prevention plan to construct the 3-D Full-Scale Earthquake Testing Facility. This will be the world's largest and strongest shaking table facility. This paper describes the outline of the project for this facility. This facility will be completed in early 2005. (author)

  10. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  11. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  12. Evaluation of Urban Planning Projects Criteria Using Fuzzy AHP Technique

    Directory of Open Access Journals (Sweden)

    Walid Mustafa Kamas

    2017-05-01

    Full Text Available In this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The land use criteria are more important than the rest of the criteria in these projects, where it received the relative importance with percentile (42.1 %.

  13. Software for project-based learning of robot motion planning

    Science.gov (United States)

    Moll, Mark; Bordeaux, Janice; Kavraki, Lydia E.

    2013-12-01

    Motion planning is a core problem in robotics concerned with finding feasible paths for a given robot. Motion planning algorithms perform a search in the high-dimensional continuous space of robot configurations and exemplify many of the core algorithmic concepts of search algorithms and associated data structures. Motion planning algorithms can be explained in a simplified two-dimensional setting, but this masks many of the subtleties and complexities of the underlying problem. We have developed software for project-based learning of motion planning that enables deep learning. The projects that we have developed allow advanced undergraduate students and graduate students to reflect on the performance of existing textbook algorithms and their own variations on such algorithms. Formative assessment has been conducted at three institutions. The core of the software used for this teaching module is also used within the Robot Operating System, a widely adopted platform by the robotics research community. This allows for transfer of knowledge and skills to robotics research projects involving a large variety robot hardware platforms.

  14. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  15. The use of high impact practices (HIPs) on chemistry lesson design and implementation by pre-service teachers

    Science.gov (United States)

    Chamrat, Suthida; Apichatyotin, Nattaya; Puakanokhirun, Kittaporn

    2018-01-01

    The quality of lesson design is essential to learning effectiveness. Research shows some characteristics of lessons have strong effect on learning which were grouped into "High Impact Practices or HIPs. This research aims to examine the use of HIPs on chemistry lesson design as a part of Teaching Science Strand in Chemistry Concepts course. At the first round of lesson design and implementing in classroom, 14 chemistry pre-services teachers freely selected topics, designed and implemented on their own ideas. The lessons have been reflected by instructors and their peers. High Impact Practices were overtly used as the conceptual framework along with the After-Action Review and Reflection (AARR). The selected High Impact practice in this study consisted of 6 elements: well-designed lesson, vary cognitive demand/academic challenge, students center approach, opportunity of students to reflect by discussion or writing, the assignment of project based learning or task, and the lesson reflects pre-service teachers' Technological Pedagogical Content Knowledge (TPACK). The second round, pre-service teachers were encouraged to explicitly used 6 High Impact Practices in cooperated with literature review specified on focused concepts for bettering designed and implemented lessons. The data were collected from 28 lesson plans and 28 classroom observations to compare and discuss between the first and second lesson and implementation. The results indicated that High Impact Practices effect on the quality of delivered lesson. However, there are some elements that vary on changes which were detailed and discussed in this research article.

  16. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. (Oak Ridge National Lab., TN (United States)); Barron, W.F. (Hong Kong Univ. (Hong Kong)); Kamel, A.M. (Ain Shams Univ., Cairo (Egypt)); Santiago, H.T. (USDOE, Washington, DC (United States))

    1992-01-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an intermediate evaluation'' of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  17. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. [Oak Ridge National Lab., TN (United States); Barron, W.F. [Hong Kong Univ. (Hong Kong); Kamel, A.M. [Ain Shams Univ., Cairo (Egypt); Santiago, H.T. [USDOE, Washington, DC (United States)

    1992-09-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an ``intermediate evaluation`` of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  18. Using project management methodology to plan and track inpatient care.

    Science.gov (United States)

    Kaufman, Darren S

    2005-08-01

    Effective care of each patient throughout a hospital admission involves executing a specific set of tasks to produce a favorable outcome within an appropriate time frame. The ProjectRounds methodology, which can be implemented using widely available software, incorporates the principles of project management in planning and control hospital inpatient care. It consists of four stages--clinical assessment, planning, scheduling, and tracking. OVERVIEW OF PROJECTROUNDS AND EXAMPLE: As an example, a 68-year-old-man is admitted with pneumonia. In clinical assessment, the admitting physician uses an assessment tool that prompts her to list all the patient's clinical issues, define the conditions that need to be met to discharge the patient, highlight special problems, and list any consultations, diagnostic tests, and procedures that are planned. In planning, the work breakdown structure--a tabulation of all the tasks in the "project" (the admission)--is created. In scheduling, a project schedule is generated, and in tracking, the clinical team evaluates and monitors the project's course. During interdisciplinary clinical rounds, the progress of the patient's hospital care can be tracked and quantified by employing the percent complete method. Tracking can be used as a "dashboard," providing a concise summary of the care that needs to be and has been rendered to the patient. Applying the tenets of project management can optimize the process of providing health care to hospital inpatients.

  19. Transition plan: Project C-018H, 200-E Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    Connor, M.D.

    1994-01-01

    The purpose of this transition plan is to ensure an orderly transfer of project information to operations to satisfy Westinghouse Hanford Company (WHC) operational requirements and objectives, and ensure safe and efficient operation of Project C-018H, the 200-E Area Effluent Treatment Facility (ETF). This plan identifies the deliverables for Project C-018H upon completion of construction and turnover to WHC for operations, and includes acceptance criteria to objectively assess the adequacy of the contract deliverables in relation to present requirements. The scope of this plan includes a general discussion of the need for complete and accurate design basis documentation and design documents as project deliverables. This plan also proposes that a configuration management plan be prepared to protect and control the transferred design documents and reconstitute the design basis and design requirements, in the event that the deliverables and project documentation received from the contractor are less than adequate at turnover

  20. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...

  1. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-10-24

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...

  2. Oil prices: demand and supply. Lesson plan

    OpenAIRE

    anonymous

    2005-01-01

    Upon completion of this lesson, students will be able to list the determinants of demand and supply, recognize which factors will cause demand curves or supply curves to shift, determine equilibrium using a demand/supply graph, and show the effects on price and quantity when equilibrium changes.

  3. Professor's Page: Do Demonstration Lessons Work?

    Science.gov (United States)

    Clarke, Doug

    2011-01-01

    As part of a large research and professional development project funded by the Catholic Education Office Melbourne (CEOM), called "Contemporary Teaching and Learning of Mathematics," the ACU team has been leading demonstration lessons. There is certainly not universal agreement on the worth of demonstration lessons in the mathematics…

  4. Gross Domestic Pizza. Active Learning Lessons. Economics International.

    Science.gov (United States)

    Zaleskiene, Irena; Venger, Anatoly; MacDonald, Rich; Davis, Debbie

    This lesson plan was developed through "Economics International," an international program to help build economic education infrastructures in the emerging market economies. It provides a lesson description; appropriate age level; economic concepts; content standards and benchmarks; related subject areas; instructional objectives; time…

  5. Pacemaker Primary Curriculum; Lesson Book Level B.

    Science.gov (United States)

    Ross, Dorothea M.; Ross, Sheila A.

    This lesson book, which is the second in a four-level program for young children with learning difficulties, describes the purpose of and equipment and procedures for teaching lessons in the following subjects areas on the primary grade level: arithmetic, reading, vocabulary, listening, planning, problem solving, social behavior, art, music, and…

  6. Pacemaker Primary Curriculum; Lesson Book Level C.

    Science.gov (United States)

    Ross, Dorothea M.; Ross, Sheila A.

    This lesson book, which is the third in a four-level program for young children with learning difficulties, describes the purpose of and equipment and procedures for teaching lessons in the following subject areas on the primary grade level: arithmetic, reading, vocabulary, spelling, printing, listening, planning, problem solving, social behavior,…

  7. Pacemaker Primary Curriculum; Lesson Book Level D.

    Science.gov (United States)

    Ross, Dorothea M.; Ross, Sheila A.

    This lesson book, which is the last in a four-level program for young children with learning difficulties, describes the purpose of and equipment and procedures for teaching lessons in the following subject areas on the primary level: arithmetic, reading, vocabulary, spelling, printing, listening, planning and problem solving, social behavior,…

  8. Supply chain management/ Some lessons learned the hard way.

    Science.gov (United States)

    Nuttall, Stephen

    2013-01-01

    This paper will look at some of the experiences, lessons and frustrations experienced in managing supply chains for business continuity. No-one has time to make all the mistakes, nor to learn all the lessons on their own, so it is useful to share experiences. Over the last 25 years, the author has been involved in supply chain management as a contract manager; a programme and project manager; and as a business continuity manager. Although times change, there are some fundamental principles that are absolutely critical in making sure that supply chains do what they are needed to do/ to keep business going. Supply chains are here to stay. Indeed, with today's drive towards outsourcing, best-shoring and contracting out, they are becoming more important every year and this will only continue over time. Moreover, in the highly competitive markets in which all organisations operate, suppliers may well be carrying out operations that not all that long ago would have been considered to be part of core business. Getting the right relationship with the supply chain is more critical than ever before.1 What does this mean to business continuity professionals? They need to think not just about their own BC plans, but about the plans of their suppliers, and even those of their suppliers' suppliers. This may seem obvious, but unlike internal BC plans written by and for an organisation, it must be considered just what a supplier's plans are designed to achieve. What business outcomes will their plans deliver? If they recover their own business, how does that affect the business they serve? Are others' assumptions of how they will react in line with theirs?

  9. Integrating gender into natural resources management projects: USAID lessons learned.

    Science.gov (United States)

    1998-01-01

    This article discusses USAID's lessons learned about integrating gender into natural resource management (NRM) projects in Peru, the Philippines, and Kenya. In Peru, USAID integrated women into a solid waste management project by lending money to invest in trash collection supplies. The loans allowed women to collect household waste, transfer it to a landfill, and provide additional sanitary disposal. The women were paid through direct fees from households and through service contracts with municipalities. In Mindanao, the Philippines, women were taught about the health impact of clean water and how to monitor water quality, including the monitoring of E. coli bacteria. Both men and women were taught soil conservation techniques for reducing the amount of silt running into the lake, which interferes with the generation of electricity and affects the health of everyone. The education helped women realize the importance of reducing silt and capitalized on their interest in protecting the health of their families. The women were thus willing to monitor the lake's water quality to determine if the conservation efforts were effective. In Kenya, USAID evaluated its Ecology, Community Organization, and Gender project in the Rift Valley, which helped resettle a landless community and helped with sustainable NRM. The evaluation revealed that women's relative bargaining power was less than men's. Organized capacity building that strengthened women's networks and improved their capacity to push issues onto the community agenda assured women a voice in setting the local NRM agenda.

  10. Planning international transit oil pipeline projects in Croatia

    International Nuclear Information System (INIS)

    Sekulic, G.; Vrbic, D.

    2004-01-01

    Planning and development of international oil pipeline projects are aimed primarily at enhancing the safety of crude oil supply. Pipeline development is affected by a variety of overlapping factors, such as energy - and environment-protection-related factors, as well as political, economic, legislative, social, technical and technological ones. The success of any pipeline planning, construction and operation in the present conditions will depend upon the degree to which the above factors have been brought in line with global trends. The government should create stable political, economic and legislative frameworks that will meet the global requirements of crude oil transport development. As regards (new) transportation companies, their function is to secure safe transport by providing competitive tariffs and granting environmental protection. A prerequisite for the pipeline planning is to have both major crude oil consumers and producers (as well as their economic and political integrations) consider any state or company as potential partners for crude oil transport and transit, respectively. Croatia and the JANAF transport company have been 'chosen' as one of priority routes for European supply with crude oil from the Caspian region and Russia and one of the directions for Russian crude oil export due to a number of advantages, opportunities and prospects for a successful development. Two international oil pipeline projects - the Druzba Adria Project and the Constanta-Pancevo-Omisalj-Trieste Project - are currently under consideration. The government commitment towards these projects has been documented by the Croatian Energy Development Strategy (April 2002) and by the Programme for its implementation (March 2004). JANAF has assumed the responsibility for carrying out the project preparation activities assigned to it by the Croatian Government and the pertinent ministries. Cooperation between JANAF and government institutions is an integral part of the procedure

  11. Designing Conservation Corridors in Production Landscapes: Assessment Methods, Implementation Issues, and Lessons Learned

    Directory of Open Access Journals (Sweden)

    Amanda T. Lombard

    2010-09-01

    Full Text Available Designing broad-scale conservation corridors has become increasingly common as a way of conducting an assessment for achieving targets for the representation and persistence of nature. However, since many of these corridors must traverse agricultural and other production landscapes, planning and implementation are not trivial tasks. Most approaches to conservation assessments in the dynamic world of production landscapes are data-intensive and analytically complex. However, in the real world, donor and other external requirements impose time and budget constraints, and dictate strong stakeholder involvement in the entire planning process. In order to accommodate this, assessments must be rapid, cheap, and the approach and products must be comprehensible and acceptable to stakeholders. Here we describe such an assessment aimed at identifying and implementing a network of conservation corridors in the Gouritz Initiative project domain of South Africa's Cape Floristic Region hotspot. We used empirical data and expert knowledge to identify a corridor network hypothesized to sustain key ecological and evolutionary processes. We also consulted experts to provide a spatially explicit assessment of the opportunity costs of conservation associated with agriculture, the predominant land use in the region. We used these products to identify categories of land requiring different actions and instruments to achieve conservation goals, thereby moving from the "where" to the "how" of conservation. This information was then fed into the collaborative strategy development process for the Gouritz Initiative. Our discussion emphasizes the lessons that we learnt from undertaking this assessment, particularly lessons regarding the implementation of the planning products. We conclude that at the outset of any planning project, a consensus on the vision must be achieved, a detailed social assessment of appropriate institutions must be undertaken, and a learning

  12. Lessons Learned from the Puerto Rico Battery Energy Storage System

    Energy Technology Data Exchange (ETDEWEB)

    BOYES, JOHN D.; DE ANA, MINDI FARBER; TORRES, WENCESLANO

    1999-09-01

    The Puerto Rico Electric Power Authority (PREPA) installed a distributed battery energy storage system in 1994 at a substation near San Juan, Puerto Rico. It was patterned after two other large energy storage systems operated by electric utilities in California and Germany. The U.S. Department of Energy (DOE) Energy Storage Systems Program at Sandia National Laboratories has followed the progress of all stages of the project since its inception. It directly supported the critical battery room cooling system design by conducting laboratory thermal testing of a scale model of the battery under simulated operating conditions. The Puerto Rico facility is at present the largest operating battery storage system in the world and is successfully providing frequency control, voltage regulation, and spinning reserve to the Caribbean island. The system further proved its usefulness to the PREPA network in the fall of 1998 in the aftermath of Hurricane Georges. The owner-operator, PREPA, and the architect/engineer, vendors, and contractors learned many valuable lessons during all phases of project development and operation. In documenting these lessons, this report will help PREPA and other utilities in planning to build large energy storage systems.

  13. An Evaluation of Project Learning Tree in British Columbia. Appendices.

    Science.gov (United States)

    Conry, Robert F.; And Others

    The volume contains seven appendices (A-G) which accompany the first volume. Appendix A provides a list of project personnel and of teachers who participated in the unit development workshop. Appendix B, composed of six sections, includes the unit lesson plans and teachers' guides used in the field study for grades 3, 5, and 7. The grade materials…

  14. Knowledge and Cognitive Process Dimensions of Technology Teachers' Lesson Objectives

    Science.gov (United States)

    Mathumbu, David; Rauscher, Willem; Braun, Max

    2014-01-01

    A clearly stated lesson objective is considered an essential component of a well-planned lesson. Many teachers of Technology, a relatively new subject in South African schools, teach Technology with rather limited training both in content and methodological approaches. This study sought to investigate and classify lesson objectives framed or…

  15. Project management plan for the isotopes facilities deactivation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    Purpose of the deactivation project is to place former isotopes production facilities at ORNL in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance. This management plan was prepared to document project objectives, define organizational relationships and responsibilities, and outline the management control systems. The project has adopted the strategy of deactivating the simple facilities first. The plan provides a road map for the quality assurance program and identifies other documents supporting the Isotopes Facilities Deactivation Project

  16. Recruitment and Lessons Learned from a Community-Based Intervention Program: The Learning Families Project in Hong Kong.

    Science.gov (United States)

    Chu, Joanna T W; Wan, Alice; Stewart, Sunita M; Ng, Kwok Tung; Lam, Tai Hing; Chan, Sophia S

    2018-01-01

    Recruitment is central to any research project, and recruitment itself should be well documented and researched. We describe our recruitment efforts for a community-based research project-entitled the Learning Families Project-conducted in Hong Kong. In collaboration with community stakeholders, residents from a public housing estate were recruited to participate in family programs aimed at enhancing family well-being. Various recruitment strategies were employed including the distribution of 19,200 leaflets, 688 posters, a banner, a kick-off ceremony, 10 promotion activities, 1,000 direct calls, word of mouth, 51 mobile counters, and 10 door-to-door visits. Drawing on field notes, research logs, short questionnaires, and focus group conducted with our community partners and residents, we describe and discuss our recruitment strategies, challenges, and lessons learned. Over a 9-month period, 980 participants were recruited and participated in our study, exceeding our recruitment goal (860 participants). Several observations were made including active recruitment strategies (i.e., door-to-door and mobile counter) being more effective than passive strategies (i.e., posters and leaflets); the importance of raising project awareness to facilitate recruitment; and the challenges encountered (i.e., burn-out and loss of motivation of staff, decreased community capacity in collaborating in research projects). The lessons learned include the importance of engaging Chinese communities, utilizing a positive outreach approach, and setting realistic expectations. Although similar recruitment strategies have been reported the West, a number of cultural differences should be taken into account when working with Chinese population. Further research is needed to examine the effectiveness of tailoring recruitment strategies to various populations.

  17. Marine radioecology. Annual report 1996. Project plan 1997

    International Nuclear Information System (INIS)

    1997-06-01

    The project plan for the EKO-1 project states that 'the main aim of the EKO-1 project is to enable faster and better assessments to be made of the effects of releases of radionuclides into the marine environment'. To meet this goal the main parts of the project were defined as follows: Model work - Identifying parameters of main interest including estimating and validating the values of these parameters; Research - Field studies, environments typical for various Nordic regions, environments with special physical or chemical characteristics. Laboratory studies; Dissemination of information - Seminars, reports, articles. During the project period emphasis has also been put on quality issues concerning sampling and analysis. The project work has progressed in accordance with project plans in 1996 and within the set budget. In modelling a parameter sensitivity analysis was carried out for a radiological assessment model used for the prediction of doses to man from dumping of radioactive waste in the Kara Sea. Doses to man were found to be generally dominated by contributions from long-lived transuranic radionuclides (plutonium and americium) which associate readily with sediments. Sediment related processes and parameters show therefore high sensitivities, especially at long distances (e.g. Barents Sea). Within the EKO-1 project there has been emphasis on encouraging the Nordic aspect of sediment research in spite of the limitations set by nationally run sampling projects. The EKO-1 project has managed this by e.g.: Organizing exchange of samples for analysis links with the EKO-2.3 project ('Limnic systems'). (EG) 52 refs

  18. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  19. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, Jeffrey H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2010-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  20. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, J.H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2009-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project

  1. Proceedings for air quality management programs: A workshop on lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Streit, G.E. [comp.

    1993-06-01

    The coordinators of this project at Los Alamos National Laboratory and the Instituto Mexicano del Petroleo proposed a workshop to bring together an international group of experts to present both the lessons of history and the current practices in air quality management around the world. The workshop would also serve as a forum for presenting the accomplishments and plans of this project and for receiving comments from the assembled group. The workshop was favored with an outstanding set of speakers who represented a broad spectrum of experience. Their papers are presented in this volume. The total attendance was forty-four (see List of Participants) with representation from numerous interested Mexican institutions. Individual reports are processed separately for the database.

  2. Proceedings for air quality management programs: A workshop on lessons learned

    International Nuclear Information System (INIS)

    Streit, G.E.

    1993-06-01

    The coordinators of this project at Los Alamos National Laboratory and the Instituto Mexicano del Petroleo proposed a workshop to bring together an international group of experts to present both the lessons of history and the current practices in air quality management around the world. The workshop would also serve as a forum for presenting the accomplishments and plans of this project and for receiving comments from the assembled group. The workshop was favored with an outstanding set of speakers who represented a broad spectrum of experience. Their papers are presented in this volume. The total attendance was forty-four (see List of Participants) with representation from numerous interested Mexican institutions. Individual reports are processed separately for the database

  3. QUEST2: Release 1: Project plan deliverable set

    International Nuclear Information System (INIS)

    Braaten, F.D.

    1995-01-01

    This Project Management Plan combines the project management deliverables from the P+ methodology which are applicable to Release 1 of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19

  4. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    Science.gov (United States)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  5. Project planning of Gen-IV sodium cooled fast reactor technology

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-15

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO{sub 2} Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety.

  6. Project planning of Gen-IV sodium cooled fast reactor technology

    International Nuclear Information System (INIS)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-01

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO 2 Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety

  7. More than Solfège and Hand Signs: Philosophy, Tools, and Lesson Planning in the Authentic Kodály Classroom

    Science.gov (United States)

    Bowyer, James

    2015-01-01

    Four components of the Kodály concept are delineated here: philosophy, objectives, essential tools, and lesson planning process. After outlining the tenets of the Kodály philosophy and objectives, the article presents the Kodály concept's essential tools, including singing, movable "do" solfège, rhythm syllables, hand signs, singing on…

  8. Saving Resources - Lesson plan of ESD in Geography

    Science.gov (United States)

    Iwamura, Takuya

    2010-05-01

    Geographical education has to perceive the world from diversified viewpoints by involving ESD (Education for Sustainable Development). This can be realized by teaching geography as an integrated science, including ESD that considers ecological, economic and social aspects.. In Japan especially, geographical education tends to emphasize the environmental aspects. The investigation of circumstances from diversified viewpoints helps to analyse the society scientifically and generates? the qualities of a global citizenship toward a sustainable society. And ESD aims at creating the values of sustainability, which is necessary for a global citizenship. In this context, I have developed the lesson plan of ESD in Geography at a secondary level.. Can advanced technologies foster sustainable development? The presentation shows the advanced technology-generated products and analyses the merits and failures with their effects on the global society. The examples of these products are hybrid cars and mobile phones. Cars are necessary for the mobility of our widespread modern society. On the other hand, it is also true that environmental pollution is becoming more serious by the increasing number of cars. We usually assume that economic development and environmental protection are contradictory. But hybrid cars which are coming to world attention now, have good gas mileage compared with normal cars, so they can conserve energy and cut down on the amount of exhaust at the same time. Mobile phones are necessary in business situations, as a tool that helps to communicate while moving. In addition, mobile phones are means that support the life of people living in sparsely populated areas like in Northern Europe. Here, we can curb costs for transmission facilities that were needed otherwise. There is one thing that underlies these advanced technology-generated products such as hybrid cars and mobile phones. The resource that makes the hybrid car technology and the miniaturization of

  9. Project management plan for the gunite and associated tanks treatability studies project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-12-01

    This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project

  10. Lessons learned from the NREL village power program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.W. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NREL`s recent experiences and lessons learned.

  11. Lessons Learned from the NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.

    1998-07-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NRELs recent experiences and lessons learned.

  12. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process.

  13. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    International Nuclear Information System (INIS)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process

  14. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  15. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    International Nuclear Information System (INIS)

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation

  16. Jackie Steals Home. Learning Page Lesson Plan.

    Science.gov (United States)

    Pulda, Arnold

    In this lesson, students draw on their previous studies of American history and culture as they analyze primary sources from "Jackie Robinson and Other Baseball Highlights, 1860s-1960s" in the American Memory collection. A close reading of two documents relating to Jackie Robinson's breaking of the racial barrier in professional baseball…

  17. Writing Assignments in Disguise: Lessons Learned Using Video Projects in the Classroom

    Science.gov (United States)

    Wade, P.; Courtney, A.

    2012-12-01

    This study describes the instructional approach of using student-created video documentaries as projects in an undergraduate non-science majors' Energy Perspectives science course. Four years of teaching this course provided many reflective teaching moments from which we have enhanced our instructional approach to teaching students how to construct a quality Ken Burn's style science video. Fundamental to a good video documentary is the story told via a narrative which involves significant writing, editing and rewriting. Many students primarily associate a video documentary with visual imagery and do not realize the importance of writing in the production of the video. Required components of the student-created video include: 1) select a topic, 2) conduct research, 3) write an outline, 4) write a narrative, 5) construct a project storyboard, 6) shoot or acquire video and photos (from legal sources), 7) record the narrative, 8) construct the video documentary, 9) edit and 10) finalize the project. Two knowledge survey instruments (administered pre- and post) were used for assessment purposes. One survey focused on the skills necessary to research and produce video documentaries and the second survey assessed students' content knowledge acquired from each documentary. This talk will focus on the components necessary for video documentaries and the instructional lessons learned over the years. Additionally, results from both surveys and student reflections of the video project will be shared.

  18. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  19. Project-Based Learning Using Discussion and Lesson-Learned Methods via Social Media Model for Enhancing Problem Solving Skills

    Science.gov (United States)

    Jewpanich, Chaiwat; Piriyasurawong, Pallop

    2015-01-01

    This research aims to 1) develop the project-based learning using discussion and lesson-learned methods via social media model (PBL-DLL SoMe Model) used for enhancing problem solving skills of undergraduate in education student, and 2) evaluate the PBL-DLL SoMe Model used for enhancing problem solving skills of undergraduate in education student.…

  20. Pearl Harbor: lessons for the dam safety community

    Energy Technology Data Exchange (ETDEWEB)

    Martin, T.E. [AMEC Earth and Environmental Ltd., Burnaby, BC (Canada)

    2001-10-01

    Every good dam safety program must be based on surveillance and emergency response planning. The same principles apply to the gathering of information for military intelligence and the planning of defence tactics. Lessons learned from failure have spurred the advancement of dam engineering. Dam safety experts can benefit from the inadequacies encountered by the military community, with the most famous occurring on December 7, 1941 in Pearl Harbor. Both intelligence gathering and contingency response planning failed miserably. The data was not properly disseminated, interpreted, analysed. The proper response to the situation was not initiated. Human error and failure to communicate are the two main reasons that explain the debacle. The inquiries into the tragedy at Pearl Harbor provided valuable lessons, related to individual and organizational failures, which the authors shared in this presentation. The relevance to dam safety was made. All Federal Bureau of Investigation (FBI) agents must read the lessons drawn from Pearl Harbor, as they have responsibility for dam safety. 4 refs.

  1. Computer-based lesson planning for the subject of Islamic Culture History

    Directory of Open Access Journals (Sweden)

    Guntur Cahyono

    2017-08-01

    Full Text Available Abstract This study aims to describe the planning, implementation, evaluation, constraints and advantages of computer utilization in the History of Islamic Culture subject in MAN Salatiga. This research is a field study, aimed at studying intensively the background, current state, and environmental interaction of a social unit. Viewed from the type of data collected, this research is included in the category of qualitative research. Qualitative research is a research procedure that produces descriptive data in the form of written or spoken words from the people, or their behavior that can be observed. Subjects of this study are teachers and students. Data collection techniques used are observation, interviews, and documentation. Data analysis uses data reduction, data presentation, and conclusions. The results of this study indicate that the planning is done by classroom teachers by making lesson plan based on 2013 Curriculum guideline. Teachers have written the utilization of computers on the lesson plan components. Utilization of computers in the classroom is as a medium and the one in the computer laboratory as media and learning resources. Computers are used as a substitute for books due to their limited availability. It is also practiced as a habituation for preparing the computer-based national examination (UNBK.   Keywords: computer utilization, learning, history of Islamic culture subject   Abstrak Penelitian ini bertujuan untuk mendeskripsikan perencanaan, pelaksanaan, evaluasi, kendala dan kelebihan pemanfaatan komputer dalam pembelajaran mata pelajaran Sejarah Kebudayaan Islam di MAN Salatiga. Penelitian ini merupakan penelitian lapangan bertujuan mempelajari secara intensif latar belakang, keadaan sekarang, dan interaksi lingkungan suatu unit sosial. Jika dilihat dari jenis data yang dikumpulkan, maka penelitian ini termasuk dalam kategori penelitian kualitatif. Penelitian kualitatif sebagai prosedur penelitian yang menghasilkan

  2. Achieving Sustainable Value Planning For Malaysian Public Projects

    Directory of Open Access Journals (Sweden)

    Muhammad Faudzi

    2016-01-01

    Full Text Available Sustainability is the central development issue in the modern economy. Through sustainable development, quality of life can be improved or maintained over time. Since Malaysia is targeting to become a high-income nation by the year 2020, financial investment in public projects should be planned comprehensively so that it will generate immediate and long-term benefits to the country and the people. Within the currently tight financial environment, achieving value for money in public spending is seen as one of the enablers to maintain the right momentum of economic growth. Previous studies have established the importance of integrating sustainability consideration into Value Planning protocol in order to achieve value for money, underpinned by the sustainable development agenda. Despite the establishment of the framework for the integration, the opportunity of such integration within the Malaysian Value Planning protocol for public projects remains unclear. The present state of sustainability consideration within the Value Planning practice should be first evaluated, so that potential interventions to enhance the integration can be introduced. Responding to the gap, this exploratory study was conducted. The data was collected by means of document analysis, interviews and observations; subsequently analysed using the Template Analysis technique. Based on the current practice of Value Planning in Malaysia, ten interventions are proposed to transform the present practice into Sustainable Value Planning. Sustainable Value Planning is seen as a comprehensive concept in achieving value for money in public spending underpinned by the overarching concept of sustainability

  3. Up-Stream Dissolved Oxygen TMDL Project Quality Assurance ProjectPlan

    Energy Technology Data Exchange (ETDEWEB)

    Stringfellow, William T.

    2005-05-13

    A quality assurance project plan (QAPP) for the execution of an ecosystem level monitoring and research program examining algal ecology in highly impaired rivers. Procedures for executing both field and laboratory surface water quality and flow analysis are described. The procedures described here are compatible with the California Surface Water Ambient Monitoring program (SWAMP).

  4. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  5. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  6. The formation of a complex community program for diabetes control: lessons learned from a case study of Project DIRECT.

    Science.gov (United States)

    Goodman, R M; Liburd, L C; Green-Phillips, A

    2001-05-01

    A case study was conducted of the formation of a diabetes initiative in a largely African American urban community. The study focused on how confluent the original project model was with actual formation, what benefits were produced, what areas of needed improvement surfaced, and how different stakeholder groups characterized one another's involvement. The project produced several benefits but also experienced needed improvements in its formation, which suffered from a lack of communication, cooperation, and coordination; unclear goals and personnel roles; and early delays. Lessons include treating project formation as an important developmental stage and reducing bureaucratic management approaches not suited for community partnerships.

  7. Project summary plan for HTGR recycle reference facility

    International Nuclear Information System (INIS)

    Baxter, B.J.

    1979-11-01

    A summary plan is introduced for completing conceptual definition of an HTGR Recycle Reference Facility (HRRF). The plan describes a generic project management concept, often referred to as the requirements approach to systems engineering. The plan begins with reference flow sheets and provides for the progressive evolution of HRRF requirements and definition through feasibility, preconceptual, and conceptual phases. The plan lays end-to-end all the important activities and elements to be treated during each phase of design. Identified activities and elements are further supported by technical guideline documents, which describe methodology, needed terminology, and where relevant a worked example

  8. Risk Management on the National Compact Stellarator Project (NCSX)

    International Nuclear Information System (INIS)

    Simmons, Robert T.; Heitzenroeder, Philip J.; Reiersen, Wayne T.; Neilson, George H.; Strykowsky, Ronald L.; Rej, Donald; Gruber, Christopher O.

    2009-01-01

    In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a 'first-of-a-kind' fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project

  9. Evaluating Levels of Project Planning and their Effects on Performance in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Godwin Idoro

    2012-11-01

    Full Text Available This study compares the level of project planning on public andprivate sectors projects and its impact on performance. Thepurpose is to create awareness of the level and effectivenessof the planning done by public and private clients in the deliveryof construction projects. A questionnaire survey administeredto a sample of 130 client representatives selected by stratifi edrandom sampling from the population of public and private clientsin the Nigerian construction industry is used and analysed usingdescriptive statistics, the t-test and Spearman correlation test. Theresults show that the level of preconstruction planning on privatesector projects is higher than that of public sector projects whilethe level of contract planning done by the latter is higher thanthat of the former. Furthermore, the performance of private sectorprojects is higher than that of public sector projects in many of theparameters used. However, the level of preparation of life-cyclecharts that concern project delivery time in both public and privatesectors projects is low and the level of project planning in the twocategories of projects has a limited impact on project performance.The understanding of how public and private sectors projectsperform in planning and its impact are expected to assist publicand private clients to know the challenges ahead of them in theireffort to improve the planning and performance of their projects.

  10. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  11. A Model of Microteaching Lesson Study Implementation in the Prospective History Teacher Education

    Science.gov (United States)

    Utami, Indah Wahyu Puji; Mashuri; Nafi'ah, Ulfatun

    2016-01-01

    Microteaching lesson study is a model to improve prospective teacher quality by incorporating several element of microteaching and lesson study. This study concern on the implementation of microteaching lesson study in prospective history teacher education. Microteaching lesson study model implemented in this study consist of three stages: plan,…

  12. Education Projects: Elaboration, Financing and Management. Fundamentals of Educational Planning, No. 38.

    Science.gov (United States)

    Magnen, Andre

    In many developing countries, the translation of political objectives to action projects is made difficult by the lack of training of staff of the ministry of education planning and managing units. This booklet deals with the implementation of these projects within the framework of the planning process. After defining projects, chapter 1 shows the…

  13. Improving IT Project Portfolio Management: Lessons Learned

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2013-01-01

    The IT PPM improvement process is not well understood, and our knowledge about what makes IT PPM improvement succeed or fail is not well developed. This article presents lessons learned from organizations trying to improve their IT PPM practice. Based on this research IT PPM practitioners are adv...

  14. FRG sealed isotopic heat sources project (C-229) project management plan

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1997-01-01

    This Project Management Plan defines the cost, scope, schedule, organizational responsibilities, and work breakdown structure for the removal of the Federal Republic of Germany (FRG) Sealed Isotopic Heat Sources from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)

  15. Lessons learned from community-based approaches to sodium reduction.

    Science.gov (United States)

    Kane, Heather; Strazza, Karen; Losby, Jan L; Lane, Rashon; Mugavero, Kristy; Anater, Andrea S; Frost, Corey; Margolis, Marjorie; Hersey, James

    2015-01-01

    This article describes lessons from a Centers for Disease Control and Prevention initiative encompassing sodium reduction interventions in six communities. A multiple case study design was used. This evaluation examined data from programs implemented in six communities located in New York (Broome County, Schenectady County, and New York City); California (Los Angeles County and Shasta County); and Kansas (Shawnee County). Participants (n = 80) included program staff, program directors, state-level staff, and partners. Measures for this evaluation included challenges, facilitators, and lessons learned from implementing sodium reduction strategies. The project team conducted a document review of program materials and semistructured interviews 12 to 14 months after implementation. The team coded and analyzed data deductively and inductively. Five lessons for implementing community-based sodium reduction approaches emerged: (1) build relationships with partners to understand their concerns, (2) involve individuals knowledgeable about specific venues early, (3) incorporate sodium reduction efforts and messaging into broader nutrition efforts, (4) design the program to reduce sodium gradually to take into account consumer preferences and taste transitions, and (5) identify ways to address the cost of lower-sodium products. The experiences of the six communities may assist practitioners in planning community-based sodium reduction interventions. Addressing sodium reduction using a community-based approach can foster meaningful change in dietary sodium consumption.

  16. Analysis of the CNSC Staffs Action Plan to Reflect Lessons Learned from Fukushima Accident

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, Sangkyu; Yune, Young Gill; Ahn, Hyungjoon; Kim, Byungjik; Lee, Jinho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-05-15

    On September 30, 2011, the Task Force completed its review and presented the public with the findings and recommendations in the CNSC Fukushima Task Force Report. The Task Force made 13 recommendations to further enhance the safety of nuclear power plants in Canada. After that, the CNSC established the CNSC Staffs Action Plan based on the Fukushima Task Force's recommendations. In Canada, 19 nuclear power reactor units are currently producing electric power, and all of them are pressurized heavy water-reactor (PHWR) types. Also, considering 2 power reactor units in Korea, Wolsung unit 1 and 2, are the same reactor type, the analysis of the CNSC Staffs Action Plan will be of benefit to determining recommendations of Korea to address lessons learned from the Fukushima Daiichi nuclear power plant. Therefore, the CNSC Staffs Action Plan was introduced and analyzed in this study. From the results of the above analysis, it is recognized that the strengthening of defense in depth, emergency preparedness and the regulatory oversight of nuclear power plants in Canada were emphasized and much similar to practices of other countries. Public consultation process establishing the CNSC Staffs action plan has been carried out several times, in order to ensure regulatory transparency, by the CNSC staffs, and this is comparable with other countries. It is expected that the detail analysis results of the above plan will be helpful to enhance the safety of domestic operating nuclear power plants.

  17. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    Science.gov (United States)

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  18. Planning risk communication for UMTRA project groundwater restoration

    Energy Technology Data Exchange (ETDEWEB)

    Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)

    1992-07-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  19. Planning risk communication for UMTRA project groundwater restoration

    International Nuclear Information System (INIS)

    Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.

    1992-01-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  20. Pre-Project planning of Capital Facilities at NASA

    OpenAIRE

    Barrow, Benjamin John

    1999-01-01

    This thesis details the development of a NASA specific Project Definition Rating Index (PDRI) tool. This tool is to be used as a checklist for determining the necessary steps to follow in defining project scope and as a means to monitor progress and assess scope definition completeness at various stages during the NASA Pre-Project Planning process. This thesis also describes and identifies specific points in the NASA Capital Facility Programming Cycle for the performance of PDRI assessments ...

  1. The Level and Quality of Accountability Talk in the Science Lessons

    Science.gov (United States)

    Motlhabane, Abraham

    2016-01-01

    Teachers are actively encouraged to plan their lessons such that there is maximum classroom talk, namely accountability talk. However, many lessons do not display sufficient accountability talk. This study attempted to better understand the level and quality of accountability talk in six science lessons. The study aimed to provide teachers with…

  2. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, Anne

    2007-01-01

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory?s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  3. The individual teacher in lesson study collaboration

    DEFF Research Database (Denmark)

    Skott, Charlotte Krog; Møller, Hanne

    2017-01-01

    used in lesson study research. Design/methodology/approach The authors use collective case studies. By being participant observers the authors provide detailed descriptions of two selected teachers’ lived experiences of lesson study collaboration. In addition to gain first-hand insights, the authors...... in the participation of each of the two teachers during a two-year lesson study project. By comparing these shifts the authors identify significant conditions for their individual learning. Research limitations/implications Although the study is small scale, both the insights into the different ways in which teachers...... participated and the theoretical insights might be valuable for other lesson study research approaches. Practical implications This paper provides valuable insights into conditions that might influence teachers’ participation in lesson study activities, especially in cultures with little experience of lesson...

  4. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  5. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  6. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  7. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site

  8. Examining approaches to renewables consultation. Lessons from Awel Aman Tawe community wind farm project

    Energy Technology Data Exchange (ETDEWEB)

    Hinshelwood, E; McCallum, D

    2001-07-01

    The overall aim was to develop and test a range of methods for a Participatory Assessment Process (PAP) in a large community on the subject of a Renewable Energy project in the area. Furthermore, to extract lessons regarding the methods and approaches undertaken. The specific objectives were: 1. To identify and shape appropriate tools, methods and approaches for undertaking a fair community assessment process regarding a Renewable Energy project in the locality. 2. To conduct an in-depth (ten month) community consultation and assessment process for a proposed wind farm. 3. To assess the methods and approaches used in the community consultation and assessment process for their efficiency and value to other developers and community groups. 4. To write up and disseminate the findings regarding the most valuable, efficient and appropriate methods and approaches undertaken. (Author)

  9. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a

  10. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  11. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  12. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  13. Couriers in the Inca Empire: Getting Your Message Across. [Lesson Plan].

    Science.gov (United States)

    2002

    This lesson shows how the Inca communicated across the vast stretches of their mountain realm, the largest empire of the pre-industrial world. The lesson explains how couriers carried messages along mountain-ridge roads, up and down stone steps, and over chasm-spanning footbridges. It states that couriers could pass a message from Quito (Ecuador)…

  14. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  15. Higher Education ERP: Lessons Learned.

    Science.gov (United States)

    Swartz, Dave; Orgill, Ken

    2001-01-01

    Shares experiences and lessons learned by chief information officers of large universities about enterprise resource planning (ERP). Specifically, provides a framework for approaching an ERP that could save universities millions of dollars. (EV)

  16. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    Science.gov (United States)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  17. [Heritage Education Lesson Plans and Slide Presentations].

    Science.gov (United States)

    Van Buren, Maurie

    Field tested in 27 schools and in grades four through twelve, this teaching unit stresses heritage education through the study of southern U.S. architectural styles for homes from the pioneer log structures to the 1950s ranch home. Each of the four lessons in this unit focuses around a slide presentation of 20 slides designed to fit into one…

  18. Large hadron collider (LHC) project quality assurance plan

    Energy Technology Data Exchange (ETDEWEB)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-09-30

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4).

  19. Large hadron collider (LHC) project quality assurance plan

    International Nuclear Information System (INIS)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-01-01

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4)

  20. Preparation for Instruction. A Module of Instruction in Teacher Education. Prepared for Project RAFT.

    Science.gov (United States)

    Handley, Herbert M., Ed.

    This module, developed by the Research Applications for Teaching (RAFT) project, was written to assist students to write lesson plans that are effective and interactive. Students are given directions for the preparation of behavioral objectives and for the selection of appropriate instructional methodologies to meet the widely varying needs of…