WorldWideScience

Sample records for lengthy permitting process

  1. When lives are put on hold: Lengthy asylum processes decrease employment among refugees

    Science.gov (United States)

    Hainmueller, Jens; Hangartner, Dominik; Lawrence, Duncan

    2016-01-01

    European governments are struggling with the biggest refugee crisis since World War II, but there exists little evidence regarding how the management of the asylum process affects the subsequent integration of refugees in the host country. We provide new causal evidence about how one central policy parameter, the length of time that refugees wait in limbo for a decision on their asylum claim, affects their subsequent economic integration. Exploiting exogenous variation in wait times and registry panel data covering refugees who applied in Switzerland between 1994 and 2004, we find that one additional year of waiting reduces the subsequent employment rate by 4 to 5 percentage points, a 16 to 23% drop compared to the average rate. This deleterious effect is remarkably stable across different subgroups of refugees stratified by gender, origin, age at arrival, and assigned language region, a pattern consistent with the idea that waiting in limbo dampens refugee employment through psychological discouragement, rather than a skill atrophy mechanism. Overall, our results suggest that marginally reducing the asylum waiting period can help reduce public expenditures and unlock the economic potential of refugees by increasing employment among this vulnerable population. PMID:27493995

  2. When lives are put on hold: Lengthy asylum processes decrease employment among refugees.

    Science.gov (United States)

    Hainmueller, Jens; Hangartner, Dominik; Lawrence, Duncan

    2016-08-01

    European governments are struggling with the biggest refugee crisis since World War II, but there exists little evidence regarding how the management of the asylum process affects the subsequent integration of refugees in the host country. We provide new causal evidence about how one central policy parameter, the length of time that refugees wait in limbo for a decision on their asylum claim, affects their subsequent economic integration. Exploiting exogenous variation in wait times and registry panel data covering refugees who applied in Switzerland between 1994 and 2004, we find that one additional year of waiting reduces the subsequent employment rate by 4 to 5 percentage points, a 16 to 23% drop compared to the average rate. This deleterious effect is remarkably stable across different subgroups of refugees stratified by gender, origin, age at arrival, and assigned language region, a pattern consistent with the idea that waiting in limbo dampens refugee employment through psychological discouragement, rather than a skill atrophy mechanism. Overall, our results suggest that marginally reducing the asylum waiting period can help reduce public expenditures and unlock the economic potential of refugees by increasing employment among this vulnerable population.

  3. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    The overall objective of this report is to analyze and compare the legal permitting and planning process for (first and foremost) new nuclear power stations in a number of selected countries. In this way the report provides relevant knowledge that could form the basis for discussing the efficiency of various national licensing processes (include the Swedish one). The study builds heavily on the analysis of legal documents and regulations, and addresses both the formal requirements for licensing and territorial planning procedures as well as the issues of public participation and access to justice in the respective countries. In addition to this legal approach, however, we also adopt an investor's perspective on the legislation, i.e., an analysis of the legal rules can influence investment decisions in practice. Furthermore, the study relies largely on a synthesis of previous studies as well as interviews with researchers, electricity companies and government officials in Sweden and abroad. The countries that are compared include Sweden, Finland, France, Canada, Switzerland, Great Britain, USA and South Korea. These include those that currently invest in new nuclear power as well as those who have recently reformed their plant permitting processes. The analysis highlights important differences among the various countries, including issues such as the political influence on the licensing process, the allocation of political power between the national and local levels, means of interacting with regular citizens, and the overall transparency and predictability of the legislation. Some selected practical experiences of the current legislation are also presented. The report first provides a short background to the role and the status of nuclear power in the global energy system, and we then present a rather comprehensive comparison of the permitting processes in the above countries. Each country section comprises a short background, a presentation of the existing

  4. 40 CFR 124.4 - Consolidation of permit processing.

    Science.gov (United States)

    2010-07-01

    ... first step in consolidation is to prepare each draft permit at the same time. (2) Whenever draft permits... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Consolidation of permit processing... PROGRAMS PROCEDURES FOR DECISIONMAKING General Program Requirements § 124.4 Consolidation of permit...

  5. 33 CFR Appendix A to Part 331 - Administrative Appeal Process for Permit Denials and Proffered Permits

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Administrative Appeal Process for... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE APPEAL PROCESS Pt. 331, App. A Appendix A to Part 331—Administrative Appeal Process for Permit Denials and Proffered Permits ER28MR00.000 ...

  6. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  7. Oversize/overweight vehicle unified permitting process (UPP) : phase I.

    Science.gov (United States)

    2017-08-01

    Multiple jurisdictions within Minnesota process oversize/overweight (OSOW) permits for the movement of freight on state roadways, county roads, and municipal and township streets. Movement of freight has increased in recent years to help support econ...

  8. 30 CFR 937.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  9. 30 CFR 773.6 - Public participation in permit processing.

    Science.gov (United States)

    2010-07-01

    ... treatment authorities, water companies; and (ii) All Federal or State governmental agencies with authority... identify the proposed permit area. It may include towns, bodies of water, local landmarks, and any other... applicant seeks a permit to mine within 100 feet of the outside right-of-way of a public road or to relocate...

  10. Effects of Minimal versus Lengthy Delay between Simulated and In Vivo Instruction on Community Performance.

    Science.gov (United States)

    Nietupski, John; And Others

    1985-01-01

    No differential effects were revealed between minimal and relatively lengthy intervals in simulated and in vivo training of two students (8 and 13 years old) with severe handicaps. Performance in community fast food restaurants was measured. (CL)

  11. Evaluation of costs to process and manage utility and driveway permits.

    Science.gov (United States)

    2014-10-01

    Reviewing and processing utility and driveway permits at the Texas Department of Transportation (TxDOT) : requires a considerable amount of involvement and coordination by TxDOT personnel, both at the district : and division levels. Currently, TxDOT ...

  12. Process for evaluation of renewal of the operating permit for Garona NPP

    International Nuclear Information System (INIS)

    Zarzuela Jimenez, J.

    2009-01-01

    Process for evaluation of renewal of the operating permit for Garona NPP. The Santa Maria de Garona nuclear power plant has requested the renewal of its operating permit for a period of ten years, this implying extension of the operating lifetime of the facility beyond the 40 years originally established. This article explains the process of evaluation that the CSN is carrying out in order to draw up a report on the technical feasibility of this proposal. (Author)

  13. Effect of Lengthy Root Canal Therapy Sessions on Temporomandibular Joint and Masticatory Muscles

    Directory of Open Access Journals (Sweden)

    Safoora Sahebi

    2010-09-01

    Full Text Available Background and aims. Trauma is one of the major factors associated with temporomandibular joint disorders (TMD. These disorders result from macro-trauma or micro-trauma. Macro-trauma might be iatrogenic; for example, from intubation procedures, third molar extraction procedures, and lengthy dental appointments. The aim of this study was to evaluate the effect of lengthy root canal therapy (more than 2 hours on TMJ and its supporting structures. Materials and methods. Eighty patients whose root canal therapy session lasted more than 2 hours were examined for the status of TMJ and masticatory muscles. After one week the second part of the examination was carried out for TMJ problems and pain and tenderness levels of masticatory muscles. Data was analyzed using Wilcoxon statistical test. Results. Women showed more pain compared to men. There was a significant increase in pain in the external acoustic meatus examination one week after root canal therapy. Patients who were treated for their posterior teeth suffered more pain than those who were treated for the anteriors and premolars. Other aspects of the examination were not affected significantly by lengthy root canal therapy. Conclusion. Lengthy dental treatments can harm TMJ and masticatory muscles and wide opening of the mouth during such appointments can worsen the situation. Therefore, it is wise to break the appointment into shorter intervals and let the patients rest during treatment to close their mouth to prevent iatrogenic damage to TMJ.

  14. Effect of Lengthy Root Canal Therapy Sessions on Temporomandibular Joint and Masticatory Muscles

    Science.gov (United States)

    Sahebi, Safoora; Moazami, Fariborz; Afsa, Masoomeh; Nabavi Zade, Mohammad Reza

    2010-01-01

    Background and aims Trauma is one of the major factors associated with temporomandibular joint disorders (TMD). These disorders result from macro-trauma or micro-trauma. Macro-trauma might be iatrogenic; for example, from intuba-tion procedures, third molar extraction procedures, and lengthy dental appointments. The aim of this study was to evaluate the effect of lengthy root canal therapy (more than 2 hours) on TMJ and its supporting structures. Materials and methods Eighty patients whose root canal therapy session lasted more than 2 hours were examined for the status of TMJ and masticatory muscles. After one week the second part of the examination was carried out for TMJ problems and pain and tenderness levels of masticatory muscles. Data was analyzed using Wilcoxon statistical test. Results Women showed more pain compared to men. There was a significant increase in pain in the external acoustic meatus examination one week after root canal therapy. Patients who were treated for their posterior teeth suffered more pain than those who were treated for the anteriors and premolars. Other aspects of the examination were not affected significantly by lengthy root canal therapy. Conclusion Lengthy dental treatments can harm TMJ and masticatory muscles and wide opening of the mouth during such appointments can worsen the situation. Therefore, it is wise to break the appointment into shorter intervals and let the patients rest during treatment to close their mouth to prevent iatrogenic damage to TMJ. PMID:22991607

  15. 77 FR 8326 - Notice of Delays in Processing of Special Permits Applications

    Science.gov (United States)

    2012-02-14

    ... following list of special permit applications that have been in process for 180 days or more. The reason(s.... duPont de 4 03-31-2012 Neumours & Company, Inc. Wilmington, DE. 8723-R Nelson Brothers 4 03-31-2012.... 11227-R Schlumberger 4 03-31-2012 Well Services a Division of Schlumberger Technology Corporation Sugar...

  16. 78 FR 22451 - Cost Recovery for Permit Processing, Administration, and Enforcement

    Science.gov (United States)

    2013-04-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Parts 701, 736, 737, 738, and 750 RIN 1029-AC65 Cost Recovery for Permit Processing, Administration, and Enforcement Correction In proposed rule...

  17. Stormwater Permits - Pending Permits

    Data.gov (United States)

    Vermont Center for Geographic Information — This layer contains pending permits by the Stormwater Management Program for impervious surfaces (operational permits) or industrial activities (MSGP). Construction...

  18. 75 FR 52057 - Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permits Applications

    Science.gov (United States)

    2010-08-24

    ... public comment under review. 3. Application is technically complex and is of significant impact or... volume of special permit applications. Meaning of Application Number Suffixes N--New application. M... Delays in Processing of Special Permits Applications AGENCY: Pipeline and Hazardous Materials Safety...

  19. Rapid progress or lengthy process? electronic personal health records in mental health

    Directory of Open Access Journals (Sweden)

    Denis Mike

    2011-07-01

    Full Text Available Abstract A major objective of many healthcare providers is to increase patients' participation in their own care. The introduction of electronic personal health records (ePHRs may help to achieve this. An ePHR is an electronic database of an individual's health information, accessible to and maintained by the patient. ePHRs are very much in vogue, with an increasing number of studies reporting their potential utility as well as cost. However, the vast majority of these studies focus on general healthcare. Little attempt has been made to document the specific problems which might occur throughout the implementation of ePHRs in mental health. This review identifies such concerns through an electronic search of the literature. Several potential difficulties are highlighted and addressed, including access to information technology, identifying relevant populations and the handling of sensitive information. Special attention is paid to the concept of 'empowerment' and what this means in relation to ePHRs.

  20. Hanford Central Waste Complex: Waste Receiving and Processing Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Central Waste Complex is an existing and planned series of treatment, and/or disposal (TSD) unites that will centralize the management of solid waste operations at a single location on the Hanford Facility. The Complex includes two units: the WRAP Facility and the Radioactive Mixed Wastes Storage Facility (RMW Storage Facility). This Part B permit application addresses the WRAP Facility. The Facility will be a treatment and storage unit that will provide the capability to examine, sample, characterize, treat, repackage, store, and certify radioactive and/or mixed waste. Waste treated and stored will include both radioactive and/or mixed waste received from onsite and offsite sources. Certification will be designed to ensure and demonstrate compliance with waste acceptance criteria set forth by onsite disposal units and/or offsite facilities that subsequently are to receive waste from the WRAP Facility. This permit application discusses the following: facility description and general provisions; waste characterization; process information; groundwater monitoring; procedures to prevent hazards; contingency plant; personnel training; exposure information report; waste minimization plan; closure and postclosure requirements; reporting and recordkeeping; other relevant laws; certification

  1. Forbidden versus permitted interactions: Disentangling processes from patterns in ecological network analysis.

    Science.gov (United States)

    Strona, Giovanni; Veech, Joseph A

    2017-07-01

    Several studies have identified the tendency for species to share interacting partners as a key property to the functioning and stability of ecological networks. However, assessing this pattern has proved challenging in several regards, such as finding proper metrics to assess node overlap (sharing), and using robust null modeling to disentangle significance from randomness. Here, we bring attention to an additional, largely neglected challenge in assessing species' tendency to share interacting partners. In particular, we discuss and illustrate with two different case studies how identifying the set of "permitted" interactions for a given species (i.e. interactions that are not impeded, e.g. by lack of functional trait compatibility) is paramount to understand the ecological and co-evolutionary processes at the basis of node overlap and segregation patterns.

  2. Data requirements for valuing externalities: The role of existing permitting processes

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Baechler, M.C.; Callaway, J.M.

    1990-08-01

    While the assessment of externalities, or residual impacts, will place new demands on regulators, utilities, and developers, existing processes already require certain data and information that may fulfill some of the data needs for externality valuation. This paper examines existing siting, permitting, and other processes and highlights similarities and differences between their data requirements and the data required to value environmental externalities. It specifically considers existing requirements for siting new electricity resources in Oregon and compares them with the information and data needed to value externalities for such resources. This paper also presents several observations about how states can take advantage of data acquired through processes already in place as they move into an era when externalities are considered in utility decision-making. It presents other observations on the similarities and differences between the data requirements under existing processes and those for valuing externalities. This paper also briefly discusses the special case of cumulative impacts. And it presents recommendations on what steps to take in future efforts to value externalities. 35 refs., 2 tabs.

  3. Maximizing flexibility and minimizing costs in the new Clean Air Act permitting process

    International Nuclear Information System (INIS)

    Novello, D.P.

    1992-01-01

    This paper reports on the new Clean Air Act (CAA) Title V operating permit program which will radically change the way tens of thousands of companies comply with the CAA. For sources in the permit program, the permit will be the implementation vehicle for the many requirements of the amended Act. The permit will also make it easier for EPA, the states and citizens to bring enforcement actions against air pollution sources for noncompliance. EPA's final permit regulations may differ significantly from the proposal on key provisions -- While the final outcome of EPA's rulemaking is of critical importance, these rules will determine the minimum elements of state permit programs, such will be left for the state to decide when they adopt their own legislation and regulations

  4. 78 FR 18429 - Cost Recovery for Permit Processing, Administration, and Enforcement

    Science.gov (United States)

    2013-03-26

    ... fees for those permits. OSM estimates 10 active surface coal mining and reclamation operations fall... provided to the coal industry. These fees are authorized under the Surface Mining Control and Reclamation... be applicable to permits for coal mining on lands under OSM's direct regulatory jurisdiction. The...

  5. 77 FR 38051 - EPA Activities To Promote Environmental Justice in the Permit Application Process

    Science.gov (United States)

    2012-06-26

    ...'' system, which means EPA will not know your identity or contact information unless you provide it in the... develop cleaner products, among other things. This ethic of corporate responsibility--more than any permit... community is another facet of responsible corporate citizenship that achieves environmental results. EPA...

  6. 77 FR 23540 - Notice of Delays in Processing of Special Permits Applications

    Science.gov (United States)

    2012-04-19

    ... information from applicant. 2. Extensive public comment under review. 3. Application is technically complex... delayed by other priority issues or volume of special permit applications. Meaning of Application Number... Applications AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: List of...

  7. 77 FR 71035 - Notice of Delays in Processing of Special Permits Applications

    Science.gov (United States)

    2012-11-28

    ... public comment under review. 3. Application is technically complex and is of significant impact or... volume of special permit applications. Meaning of Application Number Suffixes N--New application M... Applications AGENCY: Office of Hazardous Materials Safety, Pipeline and Hazardous Materials Safety...

  8. 77 FR 42363 - Notice of Delays in Processing of Special Permits Applications

    Science.gov (United States)

    2012-07-18

    ... public comment under review. 3. Application is technically complex and is of significant impact or... volume of special permit applications. Meaning of Application Number Suffixes N--New application M... Applications AGENCY: Office of Hazardous Materials Safety, Pipeline and Hazardous Materials Safety...

  9. 78 FR 27220 - EPA Activities To Promote Environmental Justice in the Permit Application Process

    Science.gov (United States)

    2013-05-09

    ..., among other things. This ethic of corporate responsibility can improve the neighboring environment and..., economic, or social conditions within these populations or communities. EPA believes that the participation... that it has the responsibility to lead by example by addressing environmental justice in its permits...

  10. 77 FR 15455 - Notice of Delays in Processing of Special Permits Applications

    Science.gov (United States)

    2012-03-15

    ... Management, LLC of RI Providence, RI. 14823-R FedEx Ground 4 05-31-2012 Package System, Inc. Moon Township... Special Permits Application 12134-P Riceland Foods, 4 03-31-2012 Inc. Stuttgart, AR. 12412-P Club Care Inc...

  11. Analysis of the permitting processes associated with exploration of Federal OCS leases. Final report. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    Under contract to the Office of Leasing Policy Development (LPDO), Jack Faucett Associates is currently undertaking the description and analysis of the Outer Continental Shelf (OCS) regulatory process to determine the nature of time delays that affect OCS production of oil and gas. This report represents the results of the first phase of research under this contract, the description and analysis of regulatory activity associated with exploration activities on the Federal OCS. Volume 1 contains the following three sections: (1) study results; (2) Federal regulatory activities during exploration of Federal OCS leases which involved the US Geological Survey, Environmental Protection Agency, US Coast Guard, Corps of Engineers, and National Ocean and Atmospheric Administration; and (3) state regulatory activities during exploration of Federal OCS leases of Alaska, California, Louisiana, Massachusetts, New Jersey, North Carolina and Texas. Volume II contains appendices of US Geological Survey, Environmental Protection Agency, Coast Guard, Corps of Engineers, the Coastal Zone Management Act, and Alaska. The major causes of delay in the regulatory process governing exploration was summarized in four broad categories: (1) the long and tedious process associated with the Environmental Protection Agency's implementation of the National Pollutant Discharge Elimination System Permit; (2) thelack of mandated time periods for the completion of individual activities in the permitting process; (3) the lack of overall coordination of OCS exploratory regulation; and (4) the inexperience of states, the Federal government and industry relating to the appropriate level of regulation for first-time lease sale areas.

  12. Process for evaluation of renewal of the operating permit for Garona NPP.; Proceso para la evaluacion de la renovacion de la autorizacion de explotacion de Garona

    Energy Technology Data Exchange (ETDEWEB)

    Zarzuela Jimenez, J.

    2009-07-01

    Process for evaluation of renewal of the operating permit for Garona NPP. The Santa Maria de Garona nuclear power plant has requested the renewal of its operating permit for a period of ten years, this implying extension of the operating lifetime of the facility beyond the 40 years originally established. This article explains the process of evaluation that the CN is carrying out in order to draw up a report on the technical feasibility of this proposal. (Author)

  13. Permitted Shelters

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Inventory of all permitted shelters in the City of Pittsburgh. Includes facility name, shelter name, location, and number of grills and tables.

  14. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  15. Ci PERMIT

    CERN Multimedia

    Relations with the Host States Service

    1999-01-01

    The Swiss Permanent Mission to the International Organisations at Geneva recalls that only the spouses and children of members of personnel resident in Switzerland and in possession of a legitimation card of types 'B', 'C', 'D' or 'E' issued by the Swiss Federal Department of Foreign Affairs are entitled to benefit from a Ci Permit.The 'demande d'attestation de permis Ci' (request for a Ci permit attestation) can be sent to the Mission only through Personnel Division (Administrative Services, Office 33/1-025).Additional information on access by family members of CERN officials to the Swiss labour market are available to you on the Web site of the Relations with the Host States Service (cf. document entitled 'Employment in Switzerland for spouses and children of CERN officials' dated March 1996).Relations with the Host States Servicehttp://www.cern.ch/relations/Tel. 72848

  16. Pattern of pre-existing IgG subclass responses to a panel of asexual stage malaria antigens reported during the lengthy dry season in Daraweesh, Sudan

    DEFF Research Database (Denmark)

    Nasr, A; Iriemenam, N C; Troye-Blomberg, M

    2011-01-01

    The anti-malarial IgG immune response during the lengthy and dry season in areas of low malaria transmission as in Eastern Sudan is largely unknown. In this study, ELISA was used for the measurement of pre-existing total IgG and IgG subclasses to a panel of malaria antigens, MSP2-3D7, MSP2-FC27...

  17. Portrait of a lengthy vaccination trajectory in Burkina Faso: from cultural acceptance of vaccines to actual immunization.

    Science.gov (United States)

    Dugas, Marylène; Dubé, Eric; Kouyaté, Bocar; Sanou, Aboubakary; Bibeau, Gilles

    2009-10-14

    The global recognition of vaccination is strongly related to the fact that it has proved in the past able to dramatically reduce the incidence of certain diseases. Nevertheless, reactions regarding the practice of vaccination still vary among communities, affecting the worldwide vaccination coverage. Numerous studies, conducted from varying perspectives, have focused on explaining this active refusal or resistance to vaccination. Although in some cases low immunization coverage has been well explained by active refusal or resistance to vaccination, little is known about the reasons for low coverage where those reactions are absent or play a minor role, especially outside an epidemic context. This study attempts to explain this situation, which is found in the health district of Nouna in Burkina Faso. An in-depth ethnographic study was undertaken in the health district of Nouna in an effort to understand, from an anthropological point of view, the logic behind the parental decision-making process regarding the vaccination or non-vaccination of children, in a context where rejection of, and reservations concerning vaccination are not major obstacles. Three elements emerged from the analysis: the empirical conceptions of childhood diseases, the perceived efficacy of vaccine and the knowledge of appropriate age for vaccination uptake; the gap between the decision-making process and the actual achievement of vaccination; and the vaccination procedure leading to vaccination uptake in the particular context of the health district of Nouna. The procedures parents must follow in order to obtain vaccination for their children appear complex and constraining, and on certain points discord with the traditional systems of meaning and idioms of distress related to pregnancy, the prevention of childhood diseases and with the cultural matrix shaping decision-making and behaviour. Attention needs to be directed at certain promotional, logistical and structural elements, and at the

  18. IFQ Halibut/Sablefish and CDQ Halibut Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Under the IFQ Halibut/Sablefish Permit Program and CDQ Halibut Permit Program permits are issued for harvesting and receiving/processing halibut, and non-trawl...

  19. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  20. Permitting a hazardous waste incinerator

    International Nuclear Information System (INIS)

    Ambrose, M.L.

    1987-01-01

    In recent years, changes in the laws and regulations have produced an increased emphasis on proper solid waste disposal. Experience with various types of industrial wastes has shown that a large segment of these materials should not go to a landfill. If these wastes are prohibited from landfills, an effective alternative is incineration. The Department of Energy (DOE) has seen the need to build an incinerator at the Oak Ridge Gaseous Diffusion Plant to treat wastes that are generated at the DOE-Oak Ridge Operations facilities, many of which are contaminated with low levels of radioactivity. An extensive effort has been put forth to bring this project to reality. Several permits from the Environmental Protection Agency and the Tennessee Department of Health and Environment are required before the facility can operate. These permits include: (1) Resource Conservation and Recovery Act Part B Permit, (2) Toxic Substances Control Act Permit, (3) National Pollutant Discharge Elimination System Permit, (4) Tennessee State Air Permit, and (5) National Emission Standard for Hazardous Air Pollutants Approval Letter. The permitting process has been very long and involved and has taken nearly three years to complete. Currently, plans are to have the facility fully operational by January 1988

  1. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  2. Nevada NPDES Permits

    Science.gov (United States)

    In Nevada, EPA’s Pacific Southwest (Region 9) issues all NPDES permits for any discharges on tribal lands. All other NPDES permits are issued by the Nevada Division of Environmental Protection (NDEP).

  3. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  4. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  5. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  6. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  7. Regulation by permit

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This chapter discusses the key elements of the operating permit program. It begins with an overview of the program and the deadlines for establishing the program. It then discusses the basic program elements, including (1) the sources covered by the program; (2) the requirements that must be contained in the new operating permits; (3) the protections afforded those possessing CAA operating permits; (4) the consequences of the failure to obtain or to comply with an operating permit; and (5) the roles of EPA, the public, and contiguous states in issuing and enforcing operating permits. This chapter then reviews the other operating permit requirements of the 1990 Amendments that will be integrated over time with the basic Title V permit program. These other requirements include the acid deposition and air toxic permit programs. In addition, many states currently have operating permit requirements that will be integrated with the new permit program of the 1990 Amendments. Finally, this chapter discusses the preconstruction permit program that applies to proposed new and modified major sources of air pollutants regulated under the Act

  8. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  9. CCS Project Permit Acquisition Protocols

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

    2013-06-30

    Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

  10. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  11. Review and revision of overload permit classification.

    Science.gov (United States)

    2013-02-01

    The Michigan Department of Transportation (MDOT) allows trucks that exceed their legal loads to cross : bridges if they apply and are approved for a permit. More than 30,000 permits have been processed each : year since 2002, providing a vital servic...

  12. Coal Mine Permit Boundaries

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — ESRI ArcView shapefile depicting New Mexico coal mines permitted under the Surface Mining Control and Reclamation Act of 1977 (SMCRA), by either the NM Mining these...

  13. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  14. Allegheny County Asbestos Permits

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Current asbestos permit data issued by the County for commercial building demolitions and renovations as required by the EPA. This file is updated daily and can be...

  15. Floodplain District Permit

    Data.gov (United States)

    Montgomery County of Maryland — The purpose of a Floodplain District Permit (FPDP) is to control floodplain development in order to protect persons and property from danger and destruction and to...

  16. BCDC Minor Permits

    Data.gov (United States)

    California Department of Resources — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  17. 40 CFR 270.30 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... permit. Proper operation and maintenance includes effective performance, adequate funding, adequate operator staffing and training, and adequate laboratory and process controls, including appropriate quality... intervals specified elsewhere in this permit. (5) Compliance schedules. Reports of compliance or...

  18. Towards tradable permits for filamentous green algae pollution

    CSIR Research Space (South Africa)

    De Lange, Willem J

    2016-09-01

    Full Text Available a reserve price for pollution permits. The subsequent market making process is explained according to five steps including permit design, terms, conditions and transactional protocol, the monitoring system, piloting and implementation. The monetary...

  19. Permit to Work System in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Shyen, A.K.S.; Azwafarina Zarmira Aznan; Md Derus Ibrahim

    2015-01-01

    A Permit-To-Work System is an essential part of the job risk assessment process. An effective Permit-To-Work System would help to prevent accident that usually involves maintenance and construction activities. In Malaysian Nuclear Agency, Radiation Safety and Health Division (BKS) has been given the responsibility to implement the system in order to fulfill the requirement of providing a safe and healthy workplace and environment for its employees as pledged in the Occupational Safety, Health and Environmental Policy. This paper presents the roles and functions of Permit-To-Work System, together with the process flow and challenges ahead. (author)

  20. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  1. Permit application modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  2. PERMITTING HAZARDOUS WASTE INCINERATORS

    Science.gov (United States)

    This publication is a compilation of information presented at a seminar series designed to address the issues that affect the issuance of hazardous waste incineration permits and to improve the overall understanding of trial burn testing. pecifically, the document provides guidan...

  3. Permit application modifications

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils

  4. Annual Hanford Site environmental permitting status report

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1998-09-17

    the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

  5. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units

  6. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  7. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  8. NRC hopes to discourage lengthy onsite storage

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Now it has become clear why last year's partial voiding of the Low-Level Waste Policy Amendments Act was seen as significant in some quarters. On June 19, 1992, the US Supreme Court ruled that the passage requiring states to take title to LLW produced within their borders was unconstitutional (NN, July 1992, p. 17). This did not change the facts that LLW is still being generated, and that interstate compacts with licensed disposal sites are now empowered to refuse LLW from outside the compacts. Still, state officials had a reason to be relieved-because they knew that the Nuclear Regulatory Commission was at work on a regulation that would have made them take title to LLW, at a radwaste generator's request, at any time after January 1, 1996, if the state did not have access to a licensed disposal site. The court ruling has forced the NRC to take this passage out of the proposal, but the agency has still gone ahead and published draft amendments intended to establish long-term onsite storage as the last resort option for LLW management

  9. 40 CFR 72.85 - Permit reopenings.

    Science.gov (United States)

    2010-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain... authority shall reopen an Acid Rain permit to incorporate nitrogen oxides requirements, consistent with part 76 of this chapter. (d) Any reopening of an Acid Rain permit shall not affect the term of the permit. ...

  10. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl [National Renewable Energy Lab. (NREL), Golden, CO (United States); Buttner, William [National Renewable Energy Lab. (NREL), Golden, CO (United States); Burgess, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  11. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  12. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  13. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    This report is part of a dangerous waste permit application for the storage of wastes from the Purex process at Hanford. Appendices are presented on the following: construction drawings; HSW-5638, specifications for disposal facility for failed equipment, Project CA-1513-A; HWS-8262, specification for Purex equipment disposal, Project CGC 964; storage tunnel checklist; classification of residual tank heels in Purex storage tunnels; emergency plan for Purex facility; training course descriptions; and the Purex storage tunnels engineering study

  14. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading...

  15. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  16. Oversize/overweight permitting practices review : phase II.

    Science.gov (United States)

    2013-02-01

    This study explores a more detailed analysis of the permitting process in the Mid-Atlantic Region and : delves into operational practice, and theory and history of the practice among states. The states : practices examined in greater detail include C...

  17. Order Granting the Petition to Object to Williams Four Corners, LLC - Sims Mesa Central Delivery Point natural gas processing plant and compressor station, Rio Arriba County, New Mexico, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. Petition to Object to the Williams Four Corners, LLC - Sims Mesa Central Delivery Point natural gas processing plant and compressor station, Rio Arriba County, New Mexico, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  19. Air quality permits in Texas and New Mexico

    International Nuclear Information System (INIS)

    Fusselman, D.K.; Hofmann, J.E.

    1991-01-01

    Permitting gas processing equipment ranges from fairly simple procedures under the Texas Air Control Board (TACB) Standard Exemption List and the New Mexico Environmental Improvement Division (NMEID) Registration Regulations to an extremely complicated procedure requiring a federal Prevention of Significant Deterioration (PSD) and/or non-attainment review. The following topics relating to obtaining air permits for gas plants will be addressed in this paper: Type of permit/exemption necessary for construction, Specific permit/exemption requirements, New Source Performance Standards (NSPS) Subparts KKK, LLL, GG, K, Ka and Kb, Potential effects of the Federal Clean Air Act Amendments (FCAA). This paper only addresses specific permitting concerns and requirements that apply to the natural gas production industry. The same requirements apply to other industries, with possible additional requirements of National Emission Standards for Hazardous Air Pollutants (NESHAP), NSPS other than Subparts KKK, LLL, GG, K, Ka and Kb, and non-attainment review for pollutants other than ozone

  20. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  1. Improving environmental permitting systems : integrated permits in the Netherlands

    NARCIS (Netherlands)

    Tolsma, Hanna

    2014-01-01

    Environmental law originally developed in a fragmented way (sectoral legislation protecting water, soil or air). This fragmented approach towards environmental protection caused problems. Citizens and businesses applying for a permit are confronted with a range of procedures with a variety of

  2. FIRE PERMIT NOW ON EDH!

    CERN Multimedia

    TIS General Safety Group or

    2001-01-01

    The electronic version of the Fire Permit form is now active. The aim of the Fire Permit procedure is to reduce the risk of fire or explosion. It is mandatory when performing 'hot work' (mainly activities which involve the use of naked flames or other heat sources - e.g. welding, brazing, cutting, grinding, etc.). Its use is explained in the CERN Fire Protection Code E. (Fire Protection) The new electronic form, which is substantially unchanged from the previous authorizing procedure, will be available on the Electronic Document Handling system (https://edh.cern.ch/) as of 1st September 2001. From this date use of the paper version should be discontinued.

  3. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) is an existing treatment, storage, and/or disposal (TSD) unit located in the 200 East Area and the adjacent 600 Area of the Hanford Site. The GTF mixes dry cementitious solids with liquid mixed waste (containing both dangerous and radioactive constituents) produced by Hanford Site operations. The GTF consists of the following: The 241-AP-02D and 241-AP-04D waste pump pits and transfer piping; Dry Materials Facility (DMF); Grout Disposal Facility (GDF), consisting of the disposal vault and support and monitoring equipment; and Grout Processing Facility (GPF) and Westinghouse Hanford Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The Grout Treatment Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this TSD unit, including the current revision, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings

  4. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  5. Massport Logan International Airport NPDES Permit | NPDES ...

    Science.gov (United States)

    2017-08-28

    Massport was issued a permit for discharging storm water to Boston Harbor on March 1, 1978. The permit expired five years later. However, EPA administratively continued the permit as allowed by regulations. EPA issued a draft permit and fact sheet (which provides EPA's technical basis for establishing effluent limits and monitoring) for public comment on July 25, 2006.

  6. 40 CFR 71.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall... OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each... standards, including those operational requirements and limitations that assure compliance with all...

  7. PERMITTING LEADERSHIP IN THE UNITED STATES

    International Nuclear Information System (INIS)

    Ken Nemeth

    2002-01-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical

  8. NPDES permits and water analyses

    International Nuclear Information System (INIS)

    Pojasek, R.B.

    1975-01-01

    Provisions of the Federal Water Pollution Control Act, as amended by P. L. 92-500, including an explanation of the National Pollutant Discharge Elimination System (NPDES), and EPA's criteria for the analysis of pollutants are discussed. The need for a revision of current restrictive variance procedures is pointed out. References for the comparison of analytical methods for water pollutants under permits, including radioactive parameters, are tabulated. (U.S.)

  9. 76 FR 81932 - Auction of FM Broadcast Construction Permits; Revised Construction Permit Number in Auction 93

    Science.gov (United States)

    2011-12-29

    ... COMMISSION Auction of FM Broadcast Construction Permits; Revised Construction Permit Number in Auction 93... the construction permit number for one of the FM broadcast construction permits for Auction 93. FOR... of the FM broadcast construction permits being offered in Auction 93. The number assigned to the...

  10. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  11. Authentication codes that permit arbitration

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, G.J.

    1987-01-01

    Objective of authentication is to detect attempted deceptions in a communications channel. Traditionally this has been restricted to providing the authorized receiver with a capability of detecting unauthentic messages. The known codes have all left open the possibility for either the transmitter to disavow a message that he actually sent to the receiver, i.e., an authentic message, or else for the receiver to falsely attribute a message of his own devising to the transmitter. Of course the party being deceived would know that he was the victim of a deception by the other, but would be unable to ''prove'' this to a third party. Ideally, authentication should provide a means to detect attempted deceptions by insiders (the transmitter or receiver) as well as outsiders (the opponent). It has been an open question of whether it was possible to devise authentication codes that would permit a third party, an arbiter, to decide (in probability) whether the transmitter or the receiver was cheating in the event of a dispute. We answer this question in that both permits the receiver to detect outsider deceptions, as well affirmative by first constructing an example of an authentication code as permitting a designated arbiter to detect insider deceptions and then by generalizing this construction to an infinite class of such codes.

  12. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  13. Using geographic information systems to compare the density of stores selling tobacco and alcohol: youth making an argument for increased regulation of the tobacco permitting process in Worcester, Massachusetts, USA.

    Science.gov (United States)

    Ogneva-Himmelberger, Yelena; Ross, Laurie; Burdick, William; Simpson, Sheryl-Ann

    2010-12-01

    This study is based on a community participatory research (CBPR) partnership between a youth group and a local university to explore whether greater regulation of tobacco permits would reduce the density of tobacco outlets overall, and particularly in low-income, high minority neighbourhoods in Worcester, Massachusetts, USA. Applying Geographic Information Systems and regression analyses to neighbourhood demographics and the location of stores selling tobacco and alcohol, the study predicts the density of tobacco outlets as compared to alcohol outlets at the neighborhood block group level and in relation to the location and demographic composition of public schools. This study found that there are more than double the number of stores that sell tobacco as compared to alcohol in the city of Worcester. For every alcohol vendor there was a 41% increase in the estimated number of tobacco vendors, independent of the effect of other variables. The likelihood of having a tobacco outlet located near a school was greater than having an alcohol outlet as the percentage of minority students in schools increases. Based on these findings, the authors conclude that to reduce the impact of tobacco on socially and economically disadvantaged communities, the issuing of tobacco permits requires more regulation and oversight and should take into consideration the density and actual location of other licensees in an area.

  14. Appeal Procedures for PSD Permits Under The Consolidated Permit Regulations

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  15. Discussion of the question whether a local authority can claim to be affected in its planning competence by a permit issued for construction of a radwaste processing plant. High Administrative Court Lueneburg, judgement of 21.1.1993 - 7 K 5/90

    International Nuclear Information System (INIS)

    Czajka, D.

    1993-01-01

    A local authority has taken legal action against the first partial permit for the construction of a radwaste conditioning pilot plant at Gorleben, claiming to be affected in its planning competence by the fact that transport of spent fuel elements between the spent fuel storage facility and the pilot plant 2 km away would have to proceed on the rural district road. The action has been discussed. Appealable head notes: A local authority is not affected in its planning competence by a permit issued for construction of a facility for radwaste processing, although the operation of said facility may result in radwaste being transported by a road crossing the local authority's territory. (orig.) [de

  16. 25 CFR 161.401 - Will new permits be granted after the initial reissuance of permits?

    Science.gov (United States)

    2010-04-01

    ... AND WATER NAVAJO PARTITIONED LANDS GRAZING PERMITS Reissuance of Grazing Permits § 161.401 Will new...) Additional permits become available; and (2) The carrying capacity and stocking rates as determined under...

  17. Clean Air Act Permitting in Nevada

    Science.gov (United States)

    Information on Clean Air Act permitting in Nevada in Nevada and EPA's oversight. Clean Air Act permitting in Nevada is the shared responsibility of one state and two local agencies, along with EPA Region 9.

  18. 5 CFR 734.202 - Permitted activities.

    Science.gov (United States)

    2010-01-01

    ... (CONTINUED) POLITICAL ACTIVITIES OF FEDERAL EMPLOYEES Permitted Activities § 734.202 Permitted activities. Employees may take an active part in political activities, including political management and political campaigns, to the extent not expressly prohibited by law and this part. ...

  19. 50 CFR 665.242 - Permits.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF COMMERCE (CONTINUED) FISHERIES IN THE WESTERN PACIFIC Hawaii Fisheries § 665.242 Permits. (a... other commercial fishing in the EEZ surrounding Hawaii. (5) A holder of a new limited access permit must...

  20. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  1. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  2. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  3. Forest Products Industry Permitting Information

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  4. 40 CFR 72.81 - Permit modifications.

    Science.gov (United States)

    2010-07-01

    ... compliance deadline extension; and (5) Changes in a thermal energy plan that result in any addition or... replacement of thermal energy. (c)(1) Permit modifications shall follow the permit issuance requirements of... projects under § 72.44(g)(1)(i) and (2) of this part. (b) The following permit revisions shall follow, at...

  5. 36 CFR 13.184 - Permit application.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permit application. 13.184 Section 13.184 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR... § 13.184 Permit application. In order to obtain or renew a permit, a person shall submit an application...

  6. 36 CFR 9.3 - Access permits.

    Science.gov (United States)

    2010-07-01

    ... MANAGEMENT Mining and Mining Claims § 9.3 Access permits. (a) All special use or other permits dealing with... operators seeking new or continued access to and from a claim after that date must file for new access permits in accordance with these regulations, unless access to a mining claim is by pack animal or foot...

  7. 40 CFR 72.51 - Permit shield.

    Science.gov (United States)

    2010-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act, as provided in this part and parts 73, 74, 75, 76, 77, and 78 of this chapter shall be deemed to be...

  8. Managing sulphur permitting for the Horizon project

    Energy Technology Data Exchange (ETDEWEB)

    Duane, Calvin [Canadian Natural (Canada)

    2011-07-01

    This document deals with the management of sulphur permitting. Sulphur permitting involves many different stakeholders such as Alberta Environment, the Energy Resources Conservation Board, and the public as well as factors such as the marketing perspectives and an air quality and air management and regulation framework which must be respected. An application under the Environmental Protection and Enhancement Act (EPEA) requires information on: sulphur recovery facilities, sulphur reduction, fuel gas sulphur content, storage, containment, groundwater monitoring and SO2 emissions. The Horizon project application submitted to the Energy Resources Conservation Board (ERCB) from Canadian Natural Resources Ltd details recovery standards, product sulphur content and the equipment, technologies, and processes that will be used for extracting sulphur. Public opinion is most vocal on the subjects of H2S emissions, visual impact, and the contamination of groundwater, surface water and soil. Marketing perspectives consist of considerations to do with shipping cost, which is higher than storage cost, and with competition from other sources provincially, nationally and internationally. Finally, air quality monitoring includes monitoring of the total reduced sulphur and terrestrial and aquatic monitoring.

  9. Area- and site-specific geothermal leasing/permitting profiles; updated geothermal leasing/permitting performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    Beeland, G.V.; Schumann, E.; Wieland, M.

    1982-02-01

    Sufficient discussion of the elements of the leasing and permitting programs is included to place the information developed in proper context. A table and process flow diagram developed previously which outline the steps in the non-competitive leasing process, is reprinted. Computer printout profiles are presented on 195 identifiable areas in the following states: Arizona, California, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. Sufficient information on the boundaries of these areas is contained in the report to permit identification of their general location on any map of the appropriate state which shows township and range locations.

  10. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  11. 77 FR 66406 - Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven States

    Science.gov (United States)

    2012-11-05

    ...-1231-9BPP] RIN 1018-AZ16 Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven... requirements of the Migratory Bird Permits Program and assigned OMB control number 1018- 0022, which expires... chapter I, title 50 of the Code of Federal Regulations, as follows: PART 21--MIGRATORY BIRD PERMITS 0 1...

  12. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Science.gov (United States)

    2010-07-01

    ... permit application shall be deemed to be operating in compliance with the Acid Rain Program. (c) A complete Acid Rain permit application shall be binding on the owners and operators and the designated... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32...

  13. Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron L [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-12-19

    Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit presentation from the WPTO FY14-FY16 Peer Review. The toolkit is aimed at regulatory agencies, consultants, project developers, the public, and any other party interested in learning more about the hydropower regulatory process.

  14. 78 FR 24308 - Notice of Application for Special Permits

    Science.gov (United States)

    2013-04-24

    .... , 49 CFR 173.222(c)(1)... To authorize the Cambridge, MA. transportation in commerce of Dangerous Goods... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION... processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR...

  15. 49 CFR 107.105 - Application for special permit.

    Science.gov (United States)

    2010-10-01

    ...; or (iii) Be submitted by electronic mail (e-mail) to: [email protected] Electronic submissions... purposes related to the application; (3) Include a designation of agent of service for process in... manufacturing special permit, include a statement of the name and street address of each facility when...

  16. 33 CFR 325.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... to submit an application for work which may require the preparation of an environmental document, a... environmental impact statement (EIS) in accordance with 33 CFR part 230, Appendix B. (c) Application form... process. Whenever the district engineer becomes aware of planning for work which may require a DA permit...

  17. Surface Self-Assembly and Properties of Monolayers Formed by Reverse Poly(butylene oxide)-poly(ethylene oxide)-poly(butylene oxide) Triblock Copolymers with Lengthy Hydrophilic Blocks

    DEFF Research Database (Denmark)

    Villar-Alvarez, Eva; Freire, Adriana Cambón; Blanco, Mateo

    2017-01-01

    The surface behavior and properties of several reverse poly(butylene oxide)-poly(ethylene oxide)-poly(butylene oxide) block copolymers, BO8EO90BO8, BO12EO227BO12, BO14EO378BO14, BO20EO411BO20, and BO21EO385BO21 at the air/water interface have been analyzed by drop tensiometry, Langmuir film balance......, and atomic force microscopy (AFM). The kinetic adsorption process of block copolymer chains at the air/water interface is a diffusion-controlled process, at short times. Structural rearrangements of the copolymer backbones are progressively more important as the adsorption carries on. The adsorption layers......, and the formed micelles appear to be elongated, interconnected and with larger thickness. As the transfer pressure increases, attractive micellar interactions are enhanced and then-lead to formation of a dense network of interconnected micelles, first followed by an evolvement to continent-like and dewetted...

  18. A System of Tradable Permits to Control Emission of Greenhouse Gases in Norway. Challenges for the Petroleum Industry

    Energy Technology Data Exchange (ETDEWEB)

    Schreiner, Per

    1998-07-01

    This presentation discusses the instruments of climate policy, comments on carbon taxes, outlines a tradable permits system, tradable permits and the petroleum industry, revenue from the offshore, and clarifies impact for the petroleum industry. Measures to reduce emissions are grouped into four: (1) Taxes on the emitted quantity, (2) Regulations that force companies to use certain processes or technologies, (3) Emission permits, (4) Information.

  19. Hanford facility dangerous waste permit application, general information portion

    Energy Technology Data Exchange (ETDEWEB)

    Price, S.M., Westinghouse Hanford

    1996-07-29

    The `Hanford Facility Dangerous Waste Permit Application` is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit- Specific Portion. The scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Documentation included in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units. A checklist indicating where information is contained in the General Information Portion, in relation to the Washington State Department of Ecology guidance documentation, is located in the Contents Section. The intent of the General Information Portion is: (1) to provide an overview of the Hanford Facility; and (2) to assist in streamlining efforts associated with treatment, storage, and/or disposal unit-specific Part B permit application, preclosure work plan, closure work plan, closure plan, closure/postclosure plan, or postclosure permit application documentation development, and the `Hanford Facility Resource Conservation and Recovery Act Permit` modification process. Revision 2 of the General Information Portion of the `Hanford Facility Dangerous Waste Permit Application` contains information current as of May 1, 1996. This document is a complete submittal and supersedes Revision 1.

  20. Double-shell tank system dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This Double-Shell Tank System Dangerous Waste Permit Application should be read in conjunction with the 242-A Evaporator Dangerous Waste Permit Application and the Liquid Effluent Retention Facility Dangerous Waste Permit Application, also submitted on June 28, 1991. Information contained in the Double-Shell Tank System permit application is referenced in the other two permit applications. The Double-Shell Tank System stores and treats mixed waste received from a variety of sources on the Hanford Site. The 242-A Evaporator treats liquid mixed waste received from the double-shell tanks. The 242-A Evaporator returns a mixed-waste slurry to the double-shell tanks and generates the dilute mixed-waste stream stored in the Liquid Effluent Retention Facility. This report contains information on the following topics: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report; Waste Minimization Plan; Closure and Postclosure Requirements; Reporting and Recordkeeping; other Relevant Laws; and Certification. 150 refs., 141 figs., 118 tabs

  1. Added value of convection-permitting reanalyses

    Science.gov (United States)

    Wahl, S.; Keller, J. D.; Ohlwein, C.; Hense, A.; Friederichs, P.; Crewell, S.

    2016-12-01

    Atmospheric reanalyses are a state-of-the-art tool to generate consistent and realistic state estimates of the atmospheric system. They are used for validation of meteorological and hydrological models, climate monitoring, and renewable energy applications, amongst others. Current reanalyses are mainly global, while regional reanalyses are emerging for North America, the polar region, and most recently for Europe. Due to the horizontal resolution used, deep convection is still parameterized even in the regional reanalyses. However, convective parameterization is a major source of errors and uncertainties in atmospheric models. Therefore, it is expected that convection permitting reanalysis systems are able to adequately simulate the mechanisms leading to high-impact weather, notably heavy precipitation and winds related to deep moist convection. A novel convective-scale regional reanalysis system for Central Europe (COSMO-REA2) has been developed by the Hans-Ertel Center for Weather Research - Climate Monitoring Branch. The system is based on the COSMO model and uses a nudging scheme for the assimilation of observational data. In addition, radar-derived rain rates are assimilated through a latent heat nudging scheme. With a horizontal grid-spacing of 2 km, the model parameterization for deep moist convective processes is turned off. As we expect the largest benefit of the convection-permitting system for precipitation, the evaluation focuses on this essential climate variable (ECV). Furthermore, precipitation is crucial for climate monitoring purposes, e.g., in the form of extreme precipitation which is an major cause of severe damages and societal costs in Europe. This study illustrates the added value of the convective-scale reanalysis compared to coarser gridded regional European and global reanalyses.

  2. Task technical plan: DWPF air permit/dispersion modeling

    International Nuclear Information System (INIS)

    Lambert, D.P.

    1993-01-01

    This Task Technical Plan summarizes work required to project the benzene emissions from the Late Wash Facility (LWF) as well as update the benzene, mercury, and NO x emissions from the remainder of the Defense Waste Processing Facility (DWPF). These calculations will reflect (1) the addition of the LWF and (2) the replacement of formic acid with nitric acid in the melter preparation process. The completed calculations will be used to assist DWPF in applying for the LWF Air Quality Permit

  3. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  4. 9 CFR 93.802 - Import permit.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Import permit. 93.802 Section 93.802..., BIRDS, FISH, AND POULTRY, AND CERTAIN ANIMAL, BIRD, AND POULTRY PRODUCTS; REQUIREMENTS FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Elephants, Hippopotami, Rhinoceroses, and Tapirs § 93.802 Import permit...

  5. 9 CFR 93.704 - Import permit.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Import permit. 93.704 Section 93.704..., BIRDS, FISH, AND POULTRY, AND CERTAIN ANIMAL, BIRD, AND POULTRY PRODUCTS; REQUIREMENTS FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Miscellaneous Animals § 93.704 Import permit. (a) General requirements. No...

  6. 9 CFR 93.912 - Import permits.

    Science.gov (United States)

    2010-01-01

    ... § 93.912 Import permits. (a) Live VHS-regulated fish imported from VHS-regulated regions through a... application for an import permit must be submitted for each shipment of live VHS-regulated fish to the Animal... intending to import live VHS-regulated fish into the United States; (4) The species and number of live VHS...

  7. 78 FR 59423 - Special Permit Applications

    Science.gov (United States)

    2013-09-26

    ... these cylinders as components on US Naval Aircraft. NEW SPECIAL PERMIT GRANTED 15839-N Sensors, Inc... medical use as limited quantities and/or ORM-D. (modes 1, 2, 3, 4, 5) EMERGENCY SPECIAL PERMIT GRANTED... commerce of certain hazardous materials which exceed the authorized quantity limitations for passenger...

  8. 40 CFR 233.21 - General permits.

    Science.gov (United States)

    2010-07-01

    ... ensure compliance with existing permit conditions an any reporting monitoring, or prenotification... apply for an individual permit. This discretionary authority will be based on concerns for the aquatic environment including compliance with paragraph (b) of this section and the 404(b)(1) Guidelines (40 CFR part...

  9. 78 FR 43268 - Special Permit Applications

    Science.gov (United States)

    2013-07-19

    .... No. Applicant Regulation(s) permit thereof MODIFICATION SPECIAL PERMIT GRANTED 4576-M Structural 49...), authorize an Alcohol, 172.102, and alternative Tobacco, 173.56(b). packaging. Firearms and Explosives (ATF... certain 173.242 and Class 3 and Class 8 173.243. materials in alternative packaging for transportation by...

  10. 25 CFR 141.12 - Peddler's permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Peddler's permits. 141.12 Section 141.12 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES BUSINESS PRACTICES ON THE NAVAJO, HOPI AND ZUNI RESERVATIONS Licensing Requirements and Procedures § 141.12 Peddler's permits. (a) Except...

  11. 7 CFR 330.208 - Courtesy permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Courtesy permits. 330.208 Section 330.208 Agriculture... PRODUCTS; GARBAGE Movement of Plant Pests § 330.208 Courtesy permits. The Deputy Administrator may issue... subject to regulation under the Plant Protection Actor any other act, as a courtesy to facilitate movement...

  12. 50 CFR 21.41 - Depredation permits.

    Science.gov (United States)

    2010-10-01

    ... PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Control of Depredating and Otherwise Injurious Birds § 21.41... control purposes. No permit is required merely to scare or herd depredating migratory birds other than... other means of concealment, decoys, duck calls, or other devices to lure or entice birds within gun...

  13. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  14. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  15. Environmental Compliance at the West Valley Demonstration Project: The Vitrification Permitting Program

    Energy Technology Data Exchange (ETDEWEB)

    L. C. Salvatori; C. B. Banzer; W. T. Watters

    1996-05-28

    The major environmental laws that apply to the West Valley Demonstration Project (WVDP) are the: Resource Conservation and Recovery Act (RCRA), Clean Air Act (CAA), Clean Water Act (CWA), Safe Drinking Water Act (SDWA), Toxic Substances Control Act (TSCA), National Environmental Policy Act (NEPA), and Emergency Planning and Community Right-To-Know Act (EPCRA). Regulations developed in accordance with these laws are administered by the New York State Department of Environmental Conservation (NYSDEC) and the U.S. Environmental Protection Agency (EPA) through state and federal programs, and regulatory requirements such as permitting. The Environmental Permits & Reports (EP&R) Group of the Environmental Affairs (EA) Department has the primary responsibility for developing a site-wide permitting program for the WVDP and obtaining the necessary permits. This report discusses the permits and the permitting process associated with the Vitrification Facility (VF).

  16. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  17. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993

  18. 40 CFR 144.31 - Application for a permit; authorization by permit.

    Science.gov (United States)

    2010-07-01

    ... well authorization by rule was for the life of the well or project. Authorization by rule for a well or... the applicant which require it to obtain permits under RCRA, UIC, the National Pollution Discharge... dumping permits under the Marine Protection Research and Sanctuaries Act. (viii) Dredge and fill permits...

  19. 78 FR 72830 - Migratory Bird Permits; Delegating Falconry Permitting Authority to 17 States

    Science.gov (United States)

    2013-12-04

    ...-0110; FF09M21200-134-FXMB1231099BPP0] RIN 1018-BA01 Migratory Bird Permits; Delegating Falconry... Migratory Bird Permits Program and assigned OMB control number 1018-0022, which expires February 28, 2014... Regulations, as follows: PART 21--MIGRATORY BIRD PERMITS 0 1. The authority citation for part 21 continues to...

  20. 77 FR 27174 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-05-09

    ...-2011-0054; FF09M21200-123-FXMB123209EAGL0L2] RIN 1018-AX91 Eagle Permits; Changes in the Regulations Governing Eagle Permitting AGENCY: Fish and Wildlife Service, Interior. ACTION: Proposed rule; extension of..., proposed rule to revise the regulations for permits for nonpurposeful take of golden eagles (Aquila...

  1. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ...-2011-0054: FF09M21200-123-FXMB123209EAGL0L2] RIN 1018-AX91 Eagle Permits; Changes in the Regulations Governing Eagle Permitting AGENCY: Fish and Wildlife Service, Interior. ACTION: Proposed rule. SUMMARY: We propose to revise the regulations for permits for nonpurposeful take of golden eagles (Aquila chrysaetos...

  2. 76 FR 3092 - Endangered Species Permit No. 1578-01 and Permit No. 1595-04

    Science.gov (United States)

    2011-01-19

    ... research permits (Permit Nos. 1578 and 1595- 03) to take shortnose sturgeon for purposes of scientific...): Permits, Conservation and Education Division, Office of Protected Resources, NMFS, 1315 East-West Highway... tags for external identification; endoscopic examination with borescopes to verify sex; blood sampling...

  3. 30 CFR 903.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ... State of Arizona, including, but not limited to the following: (i) Municipal planning statutes (A.R.S. Section 9-461 to 9-462.01); County planning and zoning statutes (A.R.S. Sections 11-322 et seq., 11-803...

  4. 30 CFR 910.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ... Georgia Water Quality Control Act, section 17-501; the Georgia Solid Waste Management Act, section 43-1681.... 910.773 Section 910.773 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE GEORGIA...

  5. 30 CFR 922.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ... Waste Management Act of 1978, MCL section 299.401; Michigan Water Resources Commission Act, MCL section.... 922.773 Section 922.773 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE MICHIGAN...

  6. 30 CFR 921.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ... Massachusetts Hazardous Waste Management Act Ch. 21C, sections 1-14; the Massachusetts Clean Water Act Ch. 21.... 921.773 Section 921.773 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE...

  7. 30 CFR 905.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ...: Federal law State law (1) Clean Water Act, as amended, 33 U.S.C. 1251 et seq The Porter-Cologne Water...). (8) Section 208 of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq The Porter-Cologne Act. (9... of California, including compliance with the Porter-Cologne Water Quality Control Act, Cal. Pub. Res...

  8. 30 CFR 947.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ..., RCW 75.20.100 (6) Department of Social Health Services: Public Sewage, WAC 248.92 Public Water Supply...: Federal law Washington law (1) Clean Water Act, as amended 33 U.S.C. 1251 et seq Water Pollution Control... Clean Water Act, as amended, 33 U.S.C. 1251 et seq Water Pollution Control Act, Chapter 90.48 RCW...

  9. A Text Mining Approach to Integrating Business Process Models and Governing Documents

    NARCIS (Netherlands)

    Ingvaldsen, Jon Espen; Gulla, Jon Altle; Su, X.; Rønneberg, Harald; Meersman, Robert; Tari, Zahir; Herrero, Pilar

    2005-01-01

    As large companies are building up their enterprise architecture solutions, they need to relate business process descriptions to lengthy and formally structured documents of corporate policies and standards. However, these documents are usually not specific to particular tasks or processes, and the

  10. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-11-19

    This is the second technical report, covering the period from April 1, 2003 through September 30, 2003. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. The geo-technical component is a shared effort between the State Department of Administration and the US Department of Energy. The Alaska Oil and Gas Conservation Commission is rapidly converting high volumes of paper documents and geo-technical information to formats suitable for search and retrieval over the Internet. The permitting component is under the lead of the DNR Office of Project Management and Permitting. A web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information on-line. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. Structural changes are taking place in terms of organization, statutory authority, and regulatory requirements. Geographic Information Systems are a central component to the organization of information, and the delivery of on-line services. Progress has been made to deploy the foundation system for the shared GIS based on open GIS protocols to the extent feasible. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells.

  11. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    The PUREX Storage Tunnels are a mixed waste storage unit consisting of two underground railroad tunnels: Tunnel Number 1 designated 218-E-14 and Tunnel Number 2 designated 218-E-15. The two tunnels are connected by rail to the PUREX Plant and combine to provide storage space for 48 railroad cars (railcars). The PUREX Storage Tunnels provide a long-term storage location for equipment removed from the PUREX Plant. Transfers into the PUREX Storage Tunnels are made on an as-needed basis. Radioactively contaminated equipment is loaded on railcars and remotely transferred by rail into the PUREX Storage Tunnels. Railcars act as both a transport means and a storage platform for equipment placed into the tunnels. This report consists of part A and part B. Part A reports on amounts and locations of the mixed water. Part B permit application consists of the following: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report

  12. Towards tradable permits for filamentous green algae pollution.

    Science.gov (United States)

    de Lange, W J; Botha, A M; Oberholster, P J

    2016-09-01

    Water pollution permit systems are challenging to design and implement. Operational systems that has maintained functionality remains few and far between, particularly in developing countries. We present current progress towards developing such a system for nutrient enrichment based water pollution, mainly from commercial agriculture. We applied a production function approach to first estimate the monetary value of the impact of the pollution, which is then used as reference point for establishing a reserve price for pollution permits. The subsequent market making process is explained according to five steps including permit design, terms, conditions and transactional protocol, the monitoring system, piloting and implementation. The monetary value of the impact of pollution was estimated at R1887 per hectare per year, which not only provide a "management budget" for filamentous green algae mitigation strategies in the study area, but also enabled the calculation of a reserve price for filamentous green algae pollution permits, which was estimated between R2.25 and R111 per gram filamentous algae and R8.99 per gram at the preferred state. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Hanford Waste Vitrification Plant Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Facility currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. This Vitrification Plant Dangerous Waste Permit Application, Revision 2, consists of both a Part A and a Part B permit application. An explanation of the Part A revisions, including Revision 4 submitted with this application, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987)

  14. An economic analysis of tradeable emission permits for sulphur dioxide emissions in Europe

    International Nuclear Information System (INIS)

    Kruitwagen, S.

    1996-01-01

    The central theme of this thesis is the analysis of the applicability of tradeable emission permits for cost-effective SO2 reduction in Europe. First, an economic theoretical background is presented based on a literature study. Second, integrated assessment models are presented and compared. One of these models is selected for simulation. Third, a new permit trading systems is developed and analysed by detailed simulations of trading schemes, including their economic and environmental implications. Chapter 2 discusses some general economic aspects of pollution control. Attention is paid to the cost effectiveness of pollution control, to the international dimension of acid rain policy and to the need for cooperation. Some general game theoretic concepts are reviewed. Also attention is paid to the alternative policy instruments for emission control, focusing on tradeable emission permits. The theory of tradeable emission permits is elaborated in Chapter 3. Permit trading for pollutants that are non-uniformly mixing is thoroughly discussed and illustrated by some empirical studies. After discussing both emission permit and deposition permit trading systems, alternative systems of tradeable permits for this kind of pollutants are examined. Two main aspects in examining permit trading systems concern (1) the kind of trading process assumed, involving the distinction between simultaneous multilateral permit trading versus bilateral sequential permit trading, and (2) the initial distribution of emission permits. The thorough discussion on tradeable permits contributes to a better understanding of this policy instrument and sheds light on the implications of permit trading for non-uniformly mixing pollutants. The findings of this chapter indicate that a new permit trading system has to be developed. Chapter 4 describes and compares integrated assessment models for simulation of acid rain control. First, three integrated assessment models for the European acid rain problem

  15. 2011 EPA Pesticide General Permit (PGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The 2011 EPA Pesticide General Permit (PGP) covers discharges of biological pesticides, and chemical pesticides that leave a residue, in areas where EPA is the NPDES...

  16. 50 CFR 600.501 - Vessel permits.

    Science.gov (United States)

    2010-10-01

    ... the permit application form. (3) Applicants for FFV's that will support U.S. vessels in joint ventures.... Failure to report a change in the ownership from that described in the current application within the...

  17. Web Air Permits (WAP R7)

    Data.gov (United States)

    U.S. Environmental Protection Agency — THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for Web Air Permits in Region 7 (WAP R7), a Lotus Notes application that once tracked comment...

  18. 78 FR 36822 - Special Permit Applications

    Science.gov (United States)

    2013-06-19

    ... lithium battery that exceeds the net quantity weight restriction when transported by motor vehicle and... Dassault Falcon Jet Corp. Little Ferry, NJ May 13, 2013. To modify the special permit to add an additional...

  19. 2013 EPA Vessels General Permit (VGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Information for any vessel that submitted a Notice of Intent (NOI), Notice of Termination (NOT), or annual report under EPA's 2013 Vessel General Permit (VGP)....

  20. Liquid effluent retention facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This permit application addresses the transfer and storage of a mixed-waste stream called 'process condensate' generated in the 242-A Evaporator. Process condensate is piped via 4,950 feet (1,509 meters) of double-wall pipe to any one of four 6.5-million gallon (24.6-million liter) double-lined basins; the double-wall pipe, basins, and ancillary equipment comprise the LERF. Eventually, the liquid will be piped directly to a new treatment system (covered under a separate Part B permit application) specifically designed to reduce the concentrations of dangerous constituents of the process condensate to acceptable levels for discharge. The LERF provides storage capacity for the process condensate during a period of projected shortage of double-shell tank (DST) volume at the Hanford Site. The DST waste is to be processed in the 242-A Evaporator, significantly reducing the volume of slurry returned to the DSTs for long-term storage for future treatment and/or disposal. Process condensate is a byproduct of this waste reduction process and is being stored temporarily in the LERF until the process condensate can be treated and disposed of as nonhazardous

  1. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  2. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  3. 76 FR 10915 - Notice of Use Authorizations; Special Recreation Permits, Other Than on Developed Recreation...

    Science.gov (United States)

    2011-02-28

    ... calculation process is to ensure that fees cover administrative costs of permit issuance, a fair return to the... reserved site fees are rounded to the nearest $5. Competitive and group use fees are rounded to the nearest...

  4. Hanford facility dangerous waste permit application, 616 Nonradioactive Dangerous Waste Storage Facility. Revision 2A

    International Nuclear Information System (INIS)

    Bowman, R.C.

    1994-04-01

    This permit application for the 616 Nonradioactive Dangerous Waste Storage Facility consists for 15 chapters. Topics of discussion include the following: facility description and general provisions; waste characteristics; process information; personnel training; reporting and record keeping; and certification

  5. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  6. 7 CFR 322.15 - APHIS review of permit applications; denial or cancellation of permits.

    Science.gov (United States)

    2010-01-01

    ... (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE BEES, BEEKEEPING BYPRODUCTS, AND BEEKEEPING EQUIPMENT Importation of Restricted Organisms § 322.15 APHIS review of permit...

  7. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  8. Air Permitting Streamlining Techniques and Approaches for Greenhouse Gases, 2012

    Science.gov (United States)

    This report presents potential GHG permit streamlining options and observations developed by the Clean Air Act Advisory Committee (CAAAC): Permits, New Source Review and Toxics Subcommittee GHG Permit Streamlining Workgroup

  9. 75 FR 23287 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-05-03

    ... the purpose of enhancing their survival. Permit No. TE-054011 Applicant: John F. Green, Riverside.... Permit No. TE-07981A Applicant: Bruce J. Turner, Eggleston, Virginia. The applicant requests a permit to...

  10. 76 FR 22448 - Delays in Processing of Special Permits Applications

    Science.gov (United States)

    2011-04-21

    ... Schlumberger Oilfield UK Plc 3 06-30-2011 Dyce, Aberdeen Scotland, Ab. 10922-M FIBA Technologies, Inc., 4 05-31... Chemicals, 4 05-31-2011 Allentown, PA. 14992-N VIP Transport, Inc., Corona, CA. 4 05-31-2011 15036-N UTLX...

  11. Early Site Permit, The Assessment of a Site

    International Nuclear Information System (INIS)

    Copete, M.; Cervantes, E.; Sabate, R.

    2010-01-01

    The vast majority of today's power plants were licensed during the 60s, 70s and 80s. Commercial nuclear energy was new, and the regulatory process evolved along with the new industry. Plants were issued a construction permit based on a preliminary design. Safety issues were not fully resolved until the plant was essentially complete, which meant utilities had high risks of increasing costs and schedule as well as the public did not have access to the details of the design until construction was nearly complete. To address these issues, the U.S. Nuclear Regulatory Commission (NRC) in 1989 established a new licensing process: 10 CFR Part 52.

  12. Analyzing the decision making process of certifying digital control systems of nuclear power plants

    International Nuclear Information System (INIS)

    Yih, Swu; Fan, Chin-Feng

    2012-01-01

    Highlights: ► We have performed basic research in analyzing certification process and developed a regulatory decision making model for nuclear digital control system certification. The model views certification as an evidence–confidence conversion process. ► We have applied this model to analyze previous nuclear digital I and C certification experiences and obtained valuable insights. ► Furthermore, a prototype of a computer-aided licensing support system based on the model has been developed to enhance regulatory review efficiency. - Abstract: Safety-critical computing systems need regulators’ approval before operation. Such a permit issue process is called “certification”. Digital instrumentation and Control (I and C) certification in the nuclear domain has always been problematic and lengthy. Thus, the certification efficiency has always been a crucial concern to the applicant whose business depends on the regulatory decision. However, to our knowledge, there is little basic research on this topic. This study presents a Regulatory Decision-Making Model aiming at analyzing the characteristics and efficiency influence factors in a generic certification process. This model is developed from a dynamic operational perspective by viewing the certification process as an evidence–confidence conversion process. The proposed model is then applied to previous nuclear digital I and C certification experiences to successfully explain why some cases were successful and some were troublesome. Lessons learned from these cases provide invaluable insights regarding to the regulatory review activity. Furthermore, to utilize the insights obtained from the model, a prototype of a computer-aided licensing support system has been developed to speed up review evidence preparation and manipulation; thus, regulatory review efficiency can be further improved.

  13. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit

  14. Hanford facility dangerous waste permit application

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-09-18

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit.

  15. 40 CFR 124.9 - Administrative record for draft permits when EPA is the permitting authority.

    Science.gov (United States)

    2010-07-01

    ... environmental impact statement provisions of section 102(2)(C) of the National Environmental Policy Act, 42 U.S... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Administrative record for draft permits when EPA is the permitting authority. 124.9 Section 124.9 Protection of Environment ENVIRONMENTAL...

  16. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil

  17. 50 CFR 36.41 - Permits.

    Science.gov (United States)

    2010-10-01

    ... issuance and administration of competitively and noncompetitively issued permits for economic and/or other... result in increased adverse impacts to refuge resources or other refuge users. (13) Upon timely approval... administering the selection of sport fishing guides and big game hunting guide-outfitters operating on national...

  18. 30 CFR 750.11 - Permits.

    Science.gov (United States)

    2010-07-01

    ..., and the Act. (c) Surface coal mining operations authorized prior to the effective date of this... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR INDIAN LANDS PROGRAM REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS § 750.11 Permits...

  19. 77 FR 16021 - Reissuance of Nationwide Permits

    Science.gov (United States)

    2012-03-19

    .... David Olson at 202-761-4922 or by email at david.b[email protected] or access the U.S. Army Corps of... Department of the Army, Corps of Engineers RIN 0710-AA71 Reissuance of Nationwide Permits AGENCY: Army Corps of Engineers, DoD. ACTION: Final notice; correction. SUMMARY: The U.S. Army Corps of Engineers...

  20. 19 CFR 12.107 - Importations permitted.

    Science.gov (United States)

    2010-04-01

    ... TREASURY SPECIAL CLASSES OF MERCHANDISE Pre-Columbian Monumental and Architectural Sculpture and Murals § 12.107 Importations permitted. Pre-Columbian monumental or architectural sculpture or mural for which... sculpture or mural, in a form acceptable to the Secretary, certifying that such exportation was not in...

  1. 19 CFR 111.19 - Permits.

    Science.gov (United States)

    2010-04-01

    ... broker who will exercise responsible supervision and control over the customs business transacted in the... granted at least one individual broker to exercise responsible supervision and control over the customs... 19 Customs Duties 1 2010-04-01 2010-04-01 false Permits. 111.19 Section 111.19 Customs Duties U.S...

  2. ENVIRONMENTAL PERMITTING IN ETHIOPIA: NO RESTRAINT ON ...

    African Journals Online (AJOL)

    ideals like “sustainable development” actually take the place of hard decisions and hide the government's ... power, such that potentially polluting businesses cannot open or continue to operate without a permit directly from ..... Definition of Powers and Duties of the Executive Organs Proc. No. 4/1995,. FEDERAL NEGARIT ...

  3. 40 CFR 70.5 - Permit applications.

    Science.gov (United States)

    2010-07-01

    ... which are exempted because of size or production rate, a list of such insignificant activities must be...: Fuels, fuel use, raw materials, production rates, and operating schedules. (v) Identification and... permit issuance, a narrative description of how the source will achieve compliance with such requirements...

  4. 40 CFR 71.9 - Permit fees.

    Science.gov (United States)

    2010-07-01

    ... administrative costs of the permit program, including transition planning, interagency coordination, contract... zero if contractor assistance is not utilized. (5) The following emissions shall be excluded from the... emissions shall be calculated using each emissions unit's actual operating hours, production rates, in-place...

  5. 36 CFR 6.9 - Permits.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permits. 6.9 Section 6.9 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR SOLID WASTE... Preservation Act and the Coastal Zone Management Act, or days required to prepare an Environmental Impact...

  6. Permitting of Wind Energy Facilities: A Handbook

    Energy Technology Data Exchange (ETDEWEB)

    NWCC Siting Work Group

    2002-08-01

    This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

  7. 40 CFR 270.40 - Transfer of permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Transfer of permits. 270.40 Section 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40...

  8. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  9. 27 CFR 19.911 - Criteria for issuance of permit.

    Science.gov (United States)

    2010-04-01

    ... Permits § 19.911 Criteria for issuance of permit. In general, an alcohol fuel producer's permit will be... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Criteria for issuance of permit. 19.911 Section 19.911 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE...

  10. 27 CFR 19.910 - Application for permit required.

    Science.gov (United States)

    2010-04-01

    ... Permits § 19.910 Application for permit required. Any person wishing to establish an alcohol fuel plant shall first make application for and obtain an alcohol fuel producer's permit. The application for a... required by 27 CFR 196.45. Alcohol fuel producers' permits are continuing unless automatically terminated...

  11. 50 CFR 21.21 - Import and export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Import and export permits. 21.21 Section... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.21 Import and export... must have a permit to import or export migratory birds, their parts, nests, or eggs. You must meet the...

  12. 43 CFR 420.24 - Permits for organized events.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  13. Onshore permitting systems analysis for coal, oil, gas, geothermal and oil shale leases. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-09-01

    The magnitude and complexity of permit processes raises a question as to their impact on the rate and scope of industrial development activity. One particular area where this issue is of concern is in new energy extraction and development activities. The initiation of new energy projects has been a national priority for several years. But, energy projects, because of their potential for creating land disturbances, are subject to many environmental and other regulations. Because of this, the permitting required of energy resource developers is extensive. Within the energy field, a major portion of development activities occurs on federal lands. This is particularly true in the Rocky Mountain states and Alaska where the principal landholder is the federal government. The permitting requirements for federal lands' development differ from those for private lands. This report assesses the impact of permitting processes for energy resource development on federal lands. The permitting processes covered include all of the major environmental, land-use, and safety permits required by agencies of federal and state governments. The lands covered include all federal lands, with emphasis on eight states with major development activities.

  14. 78 FR 37481 - Consolidation of Permit Procedures; Denial and Revocation of Permits

    Science.gov (United States)

    2013-06-21

    ... additional information would be obtained from the applicant either through automatic prompts in the ePermits... mailing tags that are no longer used. Citrus fruit and nursery stock regulated under Sec. 319.28. We would...

  15. 76 FR 59423 - Drakes Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes...

    Science.gov (United States)

    2011-09-26

    ... commercial production, harvesting, processing, and sale of shellfish at Point Reyes National Seashore. The... Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes National... Drakes Bay Oyster Company Special-use permit in Drakes Estero, Point Reyes National Seashore, California...

  16. Should advertising by aesthetic surgeons be permitted?

    Directory of Open Access Journals (Sweden)

    Neeraj Nagpal

    2017-01-01

    Full Text Available Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations.

  17. Market Power in Laboratory Emission Permit Markets

    International Nuclear Information System (INIS)

    Godby, R.

    2002-01-01

    Many proposals suggesting the use of markets to control pollution assume markets will be competitive. When markets do not exhibit competitive characteristics, however, should they still be expected to result in efficiency improvement relative to traditional approaches? This paper employs experimental economic methods to examine the effect of market structure on the use of marketable emissions permits. Results indicate that in a market with one dominant firm and a number of fringe firms, strategic manipulation occurs repeatedly in the laboratory as predicted by market power models, undermining the allocative and dynamic efficiency benefits such markets offer. When firms compete in a downstream product market dominated by the same single firm, market efficiency can actually be reduced with the implementation of permit markets. Final market efficiencies reflect initial endowments and are influenced by competitive conditions elsewhere in the economy, indicating that policy-makers should carefully consider whether markets are appropriate in such circumstances

  18. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  19. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  20. Crossing the Barriers: An Analysis of Permitting Barriers to Geothermal Development and Potential Improvement Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Young, Katherine R [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-04

    Developers have identified many non-technical barriers to geothermal power development, including permitting. Activities required for permitting, such as the associated environmental reviews, can take a considerable amount of time and delay project development. This paper discusses the impacts to geothermal development timelines due to the permitting challenges, including the regulatory framework, environmental review process, and ancillary permits. We identified barriers that have the potential to prevent geothermal development or delay timelines and defined improvement scenarios that could assist in expediting geothermal development and permitting timelines and lead to the deployment of additional geothermal resources by 2030 and 2050: (1) the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices as well as (2) an expansion of existing categorical exclusions applicable to geothermal development on Bureau of Land Management public lands to include the oil and gas categorical exclusions passed as part of the Energy Policy Act of 2005. We utilized the Regional Energy Deployment System (ReEDS) and the Geothermal Electricity Technology Evaluation Model (GETEM) to forecast baseline geothermal deployment based on previous analysis of geothermal project development and permitting timelines. The model results forecast that reductions in geothermal project timelines can have a significant impact on geothermal deployment. For example, using the ReEDS model, we estimated that reducing timelines by two years, perhaps due to the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices, could result in deployment of an additional 204 MW by 2030 and 768 MW by 2050 - a 13% improvement when compared to the business as usual scenario. The model results forecast that a timeline improvement of four years - for example with an expansion of existing categorical

  1. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    International Nuclear Information System (INIS)

    1993-01-01

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation's energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization's ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization's commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans

  2. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-27

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation`s energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization`s ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization`s commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans.

  3. 78 FR 19517 - Receipt of Applications for Endangered Species Permits

    Science.gov (United States)

    2013-04-01

    ... conservation breeding program and reintroduction to the wild. This activity will occur in Puerto Rico. Permit... conducted in Oklahoma and Arkansas. Permit Application Number: TE-97308A Applicant: John Harris, Scott...

  4. 77 FR 29453 - Applications for Modification of Special Permit

    Science.gov (United States)

    2012-05-17

    ... in Washington, DC, on May 8, 2012. Donald Burger, Chief, General Approvals and Permits. ] Regulation... Modification Special Permits 11054-M Welker Inc. Sugar 49 CFR 178.36 To modify the special Land, TX. Subpart C...

  5. 76 FR 40338 - Marine Mammals; Photography Permit No. 16360

    Science.gov (United States)

    2011-07-08

    ... Mammals; Photography Permit No. 16360 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... photography of cetaceans off Hawaii. ADDRESSES: The permit and related documents are available for review upon... photography on 12 cetacean species had been submitted by the above-named applicant. The requested permit has...

  6. 50 CFR 622.4 - Permits and fees.

    Science.gov (United States)

    2010-10-01

    ... Cape Hatteras Light, NC) and 28°35.1′ N. lat. (due east of the NASA Vehicle Assembly Building, Cape... or dealership is sold. (g) Transfer—(1) Vessel permits, licenses, and endorsements and dealer permits.... A person who acquires a vessel or dealership who desires to conduct activities for which a permit...

  7. 78 FR 12776 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-02-25

    ... comment before issuing these permits. DATES: To ensure consideration, written comments must be received on... threatened wildlife species, 50 CFR 17.62 for endangered plant species, and 50 CFR 17.72 for threatened plant...) Permit TE-64710A Applicant: Jacob Jackson, Austin, Texas. Applicant requests a new permit for research...

  8. 40 CFR 144.40 - Termination of permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Termination of permits. 144.40 Section 144.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Authorization by Permit § 144.40 Termination of permits. (a) The...

  9. 78 FR 16703 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-03-18

    ... Mateo, California The applicant requests a permit to take (harass by capture, handle, transport, and... Wildlife Service, invite the public to comment on the following applications to conduct certain activities... requires that we invite public comment before issuing these permits. DATES: Comments on these permit...

  10. 76 FR 20004 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-04-11

    ... permit to take (survey, trap, capture, handle, implant tags, collect, take biological samples, transport... Service, invite the public to comment on the following applications to conduct certain activities with... invite public comment before issuing these permits. DATES: Comments on these permit applications must be...

  11. 25 CFR 211.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 211.56 Section 211.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations and Appeals § 211.56 Geological and geophysical permits. Permits to conduct geological and geophysical operations on Indian lands which do not...

  12. 25 CFR 212.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 212.56 Section 212.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations, and Appeals § 212.56 Geological and geophysical permits. (a) Permits to conduct geological and geophysical operations on Indian lands which do not...

  13. 27 CFR 19.919 - Changes affecting applications and permits.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Changes affecting applications and permits. 19.919 Section 19.919 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX... Fuel Use Changes Affecting Applications and Permits § 19.919 Changes affecting applications and permits...

  14. 50 CFR 25.41 - Who issues refuge permits?

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Who issues refuge permits? 25.41 Section... (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ADMINISTRATIVE PROVISIONS Permits § 25.41 Who issues refuge permits? We authorize the refuge manager of the facility where an activity is to take place to issue...

  15. 21 CFR 1312.22 - Application for export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Application for export permit. 1312.22 Section... EXPORTATION OF CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.22 Application for export permit. (a) An application for a permit to export controlled substances shall be made on DEA Form 161...

  16. 21 CFR 1312.23 - Issuance of export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Issuance of export permit. 1312.23 Section 1312.23... CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.23 Issuance of export permit. (a) The... regulation in § 1312.30 of this part be exported only pursuant to the issuance of an export permit. The...

  17. 50 CFR 20.64 - Foreign export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Foreign export permits. 20.64 Section 20... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD HUNTING Importations § 20.64 Foreign export permits. No... such birds are accompanied by export permits, tags, or other documentation required by applicable...

  18. 78 FR 27255 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-05-09

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  19. 77 FR 34061 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2012-06-08

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  20. 40 CFR 96.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.323 Section 96.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... the permitting authority, as necessary to facilitate coordination of the renewal of the CAIR permit...

  1. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations

  2. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constitutents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 Appendices covering engineering drawings and operating procedures

  3. The run permit protection system for GTA

    International Nuclear Information System (INIS)

    Atkins, W.H.; Jones, R.G.

    1992-01-01

    A Run Permit system has been designed for the Ground Test Accelerator (GTA). The system implements mode-dependent software interlocks to ensure proper operation of the accelerator, enabling the ion source extractor and RF systems when proper conditions are met. The system is implemented using the GTA control system; thus all information available to the control system is also available for use in interlock logic. The logic is defined in terms of control system channels, which reflect accelerator parameters such as actuator positions, power supply values, temperatures, etc. A mode switch in the control room selects the accelerator operating mode, for example i njector only . The Run Permit software selects interlock logic as appropriate operating mode. This implementation easily accommodates logic changes as requirements evolve. To ensure reliable operation of a software-based system, a special circuit with a watch-dog timer is employed to produce the system's output signals. The software must periodically address the circuit, or the output signals are forced to a disabled state. For additional protection, there are self-test provisions for detecting and reacting to failures of the control system. (Author) 4 figs., ref

  4. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 appendices covering engineering drawings and operating procedures

  5. Oscar Renda Contracting Inc.: Request for Coverage under the Stone Quarrying, Crushing and Screening Facilities General Permit

    Science.gov (United States)

    Request for Coverage under Stone Quarrying, Crushing and Screening Facilities General Permit for Oscar Renda Contracting Inc. portable crushing operation used to process material to a pipeline project near US HWY 491 between Twin Lakes and Naschitti, NM.

  6. 14 CFR 211.20 - Initial foreign air carrier permit or transfer of a permit.

    Science.gov (United States)

    2010-01-01

    ... TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS APPLICATIONS FOR PERMITS TO FOREIGN AIR CARRIERS... the name and official address of the government air transport authority of applicant's country of... International Civil Aviation. (m) Briefly describe any agreements or cooperative working arrangements (e.g...

  7. 75 FR 58350 - Endangered Species; Permit No. 1578-01; and Permit No. 1595-04

    Science.gov (United States)

    2010-09-24

    ... river flow on migration and habitat use. The applicant now proposes to document the use of other river... must be received on or before October 25, 2010. ADDRESSES: The applications and related documents are... selecting Permit Nos. 1578-01 or 1595-04 from the list of available applications. The documents are...

  8. Hanford Site Solid Waste Landfill permit application

    International Nuclear Information System (INIS)

    1991-01-01

    Daily activities at the Hanford Site generate sanitary solid waste (nonhazardous and nonradioactive) that is transported to and permanently disposed of at the Hanford Site Solid Waste Landfill. This permit application describes the manner in which the solid Waste Landfill will be operated under Washington State Department of Ecology Minimum Functional Standards for Solid Waste Handling, Washington Administrative Code 173-304. The solid Waste Landfill is owned by the US Department of Energy -- Richland Operations Office and is used for disposal of solid waste generated at the US Department of Energy Hanford Site. The jurisdictional health department's permit application form for the Solid Waste Landfill is provided in Chapter 1.0. Chapter 2.0 provides a description of the Hanford Site and the Solid Waste Landfill and reviews applicable locational, general facility, and landfilling standards. Chapter 3.0 discusses the characteristics and quantity of the waste disposed of in the Solid Waste Landfill. Chapter 4.0 reviews the regional and site geology and hydrology and the groundwater and vadose zone quality beneath the landfill. Chapters 5.0, 6.0, and 7.0 contain the plan of operation, closure plan, and postclosure plan, respectively. The plan of operation describes the routine operation and maintenance of the Solid Waste Landfill, the environmental monitoring program, and the safety and emergency plans. Chapter 5.0 also addresses the operational cover, environmental controls, personnel requirements, inspections, recordkeeping, reporting, and site security. The postclosure plan describes requirements for final cover maintenance and environmental monitoring equipment following final closure. Chapter 8.0 discusses the integration of closure and postclosure activities between the Solid Waste Landfill and adjacent Nonradioactive Dangerous Waste Landfill. 76 refs., 48 figs, 15 tabs

  9. ER-16 regulation. Requirements for granting the permit exceptional use of medical devices in humans

    International Nuclear Information System (INIS)

    2015-01-01

    The purpose of this regulation is to establish requirements for applying for a permit exceptional use of medical equipment in Human Beings, the procedures for the evaluation process and bestowal. This regulation is aimed at researchers and designers of medical equipment, related to or associated with National Health Service's priority programs of interest to health.

  10. Coping with EPA's new petroleum industry storm water permits

    International Nuclear Information System (INIS)

    Veal, S.C.; Whitescarver, J.P.

    1994-01-01

    The United States Environmental Protection Agency has just released for public comment its so-called multi-sector industry specific storm water permit. This permit -- developed in response to the 730 group storm water permit applications submitted in 1992 to EPA -- proposes the establishment of specific runoff sampling and facility design requirements for at least two petroleum industry sectors. This proposed permit establishes specific conditions for the oil and gas extraction section (SIC group 13) and for lubricant manufacturers (SIC 2992). Permit conditions are also established for allied industrial sectors such as the chemical, transportation and asphalt materials industries. By most standards, the proposed permit is much tougher than EPA's baseline general permit for storm water discharges which was released in September of 1992. For example, under the proposal, most industries are required to perform periodic storm water sampling. EPA has also established storm water effluent and performance standards for several industrial categories. This paper will discuss the petroleum industry specific conditions of the new permit. The paper will also discuss the results of the industry-wide storm water sampling efforts undertaken by more than 300 oil patch facilities across the country. In particular, sampling results will be discussed in the context to the permit conditions proposed by EPA. The paper will also discuss strategies for dealing with the new permits

  11. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    International Nuclear Information System (INIS)

    1994-08-01

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81 Water Services waste water

  12. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81 Water Services waste water.

  13. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application

    International Nuclear Information System (INIS)

    1993-01-01

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation

  14. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-24

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

  15. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  16. Marketable pollution permits with uncertainty and transaction costs

    International Nuclear Information System (INIS)

    Montero, Juan-Pablo

    1998-01-01

    Increasing interest in the use of marketable permits for pollution control has become evident in recent years. Concern regarding their performance still remains because empirical evidence has shown transaction costs and uncertainty to be significant in past and existing marketable permits programs. In this paper we develop theoretical and numerical models that include transaction costs and uncertainty (in trade approval) to show their effects on market performance (i.e., equilibrium price of permits and trading volume) and aggregate control costs. We also show that in the presence of transaction costs and uncertainty the initial allocation of permits may not be neutral in terms of efficiency. Furthermore, using a numerical model for a hypothetical NO x trading program in which participants have discrete control technology choices, we find that aggregate control costs and the equilibrium price of permits are sensitive to the initial allocation of permits, even for constant marginal transaction costs and certainty

  17. Moral concerns on tradable pollution permits in international environmental agreements

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Kverndokk, Snorre

    2010-01-01

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  18. The efficiency and equity of marketable permits for CO2 emissions

    International Nuclear Information System (INIS)

    Rose, A.; Stevens, B.

    1993-01-01

    This paper examines the efficiency and equity implications of alternative assignments of marketable permits for carbon dioxide. A non-linear programming model is used to estimate the net welfare changes of permit allocations based on Sovereignty and Rawlsian equity criteria for 8 countries/regions covering the spectrum of economic development levels. The net welfare gains associated with an overall 20% reduction in CO 2 emissions are estimated to be nearly 20 billion dollars, an increase of several billion dollars over a system of inflexible emission quotas requiring 20% abatement in each country. Also, although the welfare changes implied by alternative permit assignments may vary greatly between countries before trading, the trading process significantly reduces the disparities. This result stems from the Coase Theorem, which implies a uniquely efficient outcome. That is, individual country abatement levels and, hence, costs, are the same under all permit assignments after trading, and net welfare for a given nation differs only by the amount of permit revenues/expenditures associated with the application of alternative equity criteria. Foremost among the paper's policy implications is that although equity criteria may differ significantly in principle, their welfare implications in practice may be very similar for various subsets of these criteria. This should reduce tensions at the bargaining table and facilitate the negotiation of greenhouse gas agreements. 52 refs., 3 figs., 8 tabs

  19. Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

    Energy Technology Data Exchange (ETDEWEB)

    Van Cleve, Frances B.; Copping, Andrea E.

    2010-11-30

    The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

  20. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  1. 78 FR 53157 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-08-28

    ... circumstriata) Phantom Tryonia (Tryonia cheatumi) Diminutive amphipod (Gammarus hyalleloides) Pecos amphipod (Gammarus pecos) Permit TE-94766A Applicant: Carmen Greenwood, Oklahoma State University, Stillwater...

  2. Liquid effluent retention facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This appendix to the Liquid Effluent Retention Facility Dangerous Waste Permit Application contains pumps, piping, leak detection systems, geomembranes, leachate collection systems, earthworks and floating cover systems

  3. Tradeable emission permits in Dutch environmental policy. A utopia?

    International Nuclear Information System (INIS)

    Schuurman, S.J.

    1997-01-01

    Because of the lack of experience with permits in the Netherlands, and in view of the similarities between various other tradeable permit systems, the functioning of Dutch systems of tradeable fish, milk and manure quotas is discussed. Evaluation of these systems is based on criteria of effectiveness, target-group efficiency and government efficiency. These systems of tradeable permits appear to constitute a successful addition to the Dutch policy of direct regulation. Considering this, and the favorable American experience with the Emissions Trading Program, tradeable emission permits deserve a chance to be implemented in Dutch environmental policy. The question remains, however, whether the Dutch government is ready for such a step. 28 refs

  4. 77 FR 7175 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2012-02-10

    ...-59580A Applicant: Rocky Mountain Ecology, Santa Fe, New Mexico. Applicant requests a new permit for... surveys, stranding activities, holding, blood collection, and rehabilitation for Kemp's ridley...

  5. Cooperative Emissions Trading Game: International Permit Market Dominated by Buyers.

    Science.gov (United States)

    Honjo, Keita

    2015-01-01

    Rapid reduction of anthropogenic greenhouse gas emissions is required to mitigate disastrous impacts of climate change. The Kyoto Protocol introduced international emissions trading (IET) to accelerate the reduction of carbon dioxide (CO2) emissions. The IET controls CO2 emissions through the allocation of marketable emission permits to sovereign countries. The costs for acquiring additional permits provide buyers with an incentive to reduce their CO2 emissions. However, permit price has declined to a low level during the first commitment period (CP1). The downward trend in permit price is attributed to deficiencies of the Kyoto Protocol: weak compliance enforcement, the generous allocation of permits to transition economies (hot air), and the withdrawal of the US. These deficiencies created a buyer's market dominated by price-making buyers. In this paper, I develop a coalitional game of the IET, and demonstrate that permit buyers have dominant bargaining power. In my model, called cooperative emissions trading (CET) game, a buyer purchases permits from sellers only if the buyer forms a coalition with the sellers. Permit price is determined by bargaining among the coalition members. I evaluated the demand-side and supply-side bargaining power (DBP and SBP) using Shapley value, and obtained the following results: (1) Permit price is given by the product of the buyer's willingness-to-pay and the SBP (= 1 - DBP). (2) The DBP is greater than or equal to the SBP. These results indicate that buyers can suppress permit price to low levels through bargaining. The deficiencies of the Kyoto Protocol enhance the DBP, and contribute to the demand-side dominance in the international permit market.

  6. Cooperative Emissions Trading Game: International Permit Market Dominated by Buyers.

    Directory of Open Access Journals (Sweden)

    Keita Honjo

    Full Text Available Rapid reduction of anthropogenic greenhouse gas emissions is required to mitigate disastrous impacts of climate change. The Kyoto Protocol introduced international emissions trading (IET to accelerate the reduction of carbon dioxide (CO2 emissions. The IET controls CO2 emissions through the allocation of marketable emission permits to sovereign countries. The costs for acquiring additional permits provide buyers with an incentive to reduce their CO2 emissions. However, permit price has declined to a low level during the first commitment period (CP1. The downward trend in permit price is attributed to deficiencies of the Kyoto Protocol: weak compliance enforcement, the generous allocation of permits to transition economies (hot air, and the withdrawal of the US. These deficiencies created a buyer's market dominated by price-making buyers. In this paper, I develop a coalitional game of the IET, and demonstrate that permit buyers have dominant bargaining power. In my model, called cooperative emissions trading (CET game, a buyer purchases permits from sellers only if the buyer forms a coalition with the sellers. Permit price is determined by bargaining among the coalition members. I evaluated the demand-side and supply-side bargaining power (DBP and SBP using Shapley value, and obtained the following results: (1 Permit price is given by the product of the buyer's willingness-to-pay and the SBP (= 1 - DBP. (2 The DBP is greater than or equal to the SBP. These results indicate that buyers can suppress permit price to low levels through bargaining. The deficiencies of the Kyoto Protocol enhance the DBP, and contribute to the demand-side dominance in the international permit market.

  7. Early Site Permit Demonstration Program: Station design alternatives report

    International Nuclear Information System (INIS)

    1993-03-01

    This report provides the results of investigating the basis for including Station Design Alternatives (SDAs) in the regulatory guidance given for nuclear plant environmental reports (ERs), explains approaches or processes for evaluating SDAs at the early site permit (ESP) stage, and applies one of the processes to each of the ten systems or subsystems considered as SDAS. The key objective o this report s to demonstrate an adequate examination of alternatives can be performed without the extensive development f design data. The report discusses the Composite Suitability Approach and the Established Cutoff Approach in evaluating station design alternatives and selects one of these approaches to evaluate alternatives for each of the plant or station that were considered. Four types of ALWRs have been considered due to the availability of extensive plant data: System 80+, AP600, Advanced Boiling Reactor (ABWR), and Simplified Boiling Water Reactor (SBWR). This report demonstrates the feasibility of evaluating station design alternatives when reactor design detail has not been determined, quantitatively compares the potential ental impacts of alternatives, and focuses the ultimate selection of a alternative on cost and applicant-specific factors. The range of alternatives system is deliberately limited to a reasonable number to demonstrate the or to the three most commonly used at operating plants

  8. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1993-01-01

    The reference design for the underground facilities at the Waste Isolation Pilot Plant was developed using the best criteria available at initiation of the detailed design effort. These design criteria are contained in the US Department of Energy document titled Design Criteria, Waste Isolation Pilot Plant (WIPP). Revised Mission Concept-IIA (RMC-IIA), Rev. 4, dated February 1984. The validation process described in the Design Validation Final Report has resulted in validation of the reference design of the underground openings based on these criteria. Future changes may necessitate modification of the Design Criteria document and/or the reference design. Validation of the reference design as presented in this report permits the consideration of future design or design criteria modifications necessitated by these changes or by experience gained at the WIPP. Any future modifications to the design criteria and/or the reference design will be governed by a DOE Standard Operation Procedure (SOP) covering underground design changes. This procedure will explain the process to be followed in describing, evaluating and approving the change

  9. 78 FR 27249 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-05-09

    ... Thompson, Riverside, California The applicant requests a permit renewal to take (monitor nests) the least... applicant requests a permit renewal to take (survey, locate, and monitor nests) the California least tern... take (harass by survey and locate and monitor nests) the southwestern willow flycatcher (Empidonax...

  10. 50 CFR 300.182 - HMS international trade permit.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false HMS international trade permit. 300.182... FISHERIES REGULATIONS International Trade Documentation and Tracking Programs for Highly Migratory Species § 300.182 HMS international trade permit. (a) General. An importer, entering for consumption fish or...

  11. 75 FR 69701 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-11-15

    ... permit to import biological samples from wild brown hyenas (Parahyaena brunnea), for the purpose of... permit to import biological samples from wild thick-billed parrots (Rhynchopsitta pachyrhyncha), from the..., NY; PRT-26730A; Applicant: John Dosch, Zanesville, OH; PRT-26632A; Applicant: Mark Conklin...

  12. 75 FR 14627 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-03-26

    ... permit to export and re-import non-living museum specimens of endangered and threatened species of... non-living museum specimens of endangered and threatened species of animals previously accessioned... permit to import up to 1,000 biological samples annually from polar bears (Ursus maritimus) from Canada...

  13. 48 CFR 52.247-2 - Permits, Authorities, or Franchises.

    Science.gov (United States)

    2010-10-01

    ... Franchises. 52.247-2 Section 52.247-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....247-2 Permits, Authorities, or Franchises. As prescribed in 47.207-1(a), insert the following clause: Permits, Authorities, or Franchises (JAN 1997) (a) The offeror does □, does not □, hold authorization from...

  14. 75 FR 59711 - Audit Program for Texas Flexible Permit Holders

    Science.gov (United States)

    2010-09-28

    ... responsible corporate citizens. This Audit Program reflects the purpose and incentives of EPA's Audit Policy... AGENCY Audit Program for Texas Flexible Permit Holders AGENCY: Environmental Protection Agency (EPA). ACTION: Final Notice of Clean Air Act (CAA) voluntary audit compliance program for flexible permit...

  15. 50 CFR 15.22 - Permits for scientific research.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Permits for scientific research. 15.22... for scientific research. (a) Application requirements for permits for scientific research. Each... description of the scientific research to be conducted on the exotic bird requested, including: (i) Formal...

  16. 75 FR 5101 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-02-01

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N010; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  17. 76 FR 8374 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N021; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  18. 75 FR 45650 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N149; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of an application to...

  19. 75 FR 52012 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-24

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N181; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  20. 76 FR 33334 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N112; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  1. 75 FR 28278 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N092; 10120-1113-0000-F5] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: In accordance with the requirements of the...

  2. 75 FR 20621 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-ES-2009-N0054]; [30120-1113-0000-F6] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: We, the U.S. Fish and...

  3. 75 FR 20622 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N054; 10120-1113-0000-F5] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of a permit application; request for comments. SUMMARY: In accordance with the requirements of the...

  4. 76 FR 10063 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-23

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N026; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  5. 75 FR 27361 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-14

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N095; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  6. 76 FR 18576 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-04-04

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N056; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  7. 9 CFR 73.10 - Permitted dips; substances allowed.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Permitted dips; substances allowed. 73.10 Section 73.10 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT... flowers of sulphur or sulphur flour to 100 gallons of water; or a specifically permitted proprietary brand...

  8. 78 FR 45954 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-07-30

    ... to do so. II. Background To help us carry out our conservation responsibilities for affected species.... Permit Applications A. Endangered Species Applicant: Association for the Conservation of Threatened... permit to export biological samples of Asian elephants (Elephas maximus) to the African Lion Safari...

  9. 76 FR 33337 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-06-08

    ..., collect, transport, hold in captivity, and take biological samples) the Ohlone tiger beetle (Cicindela... Service, invite the public to comment on the following applications to conduct certain activities with... invite public comment before issuing these permits. DATES: Comments on these permit applications must be...

  10. 76 FR 6490 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-02-04

    ... permit to take (trap, seine, capture, handle, fin clip, release, collect, transport, and captive breed... requests a permit to take (capture, handle, collect, transport, and kill) the Lost River sucker (Deltistes... Service, invite the public to comment on the following applications to conduct certain activities with...

  11. 78 FR 9727 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-02-11

    ... grasshopper (Trimerotropis infantilis), and take (capture, handle, transport, relocate, and release) the Smith... Wildlife Service, invite the public to comment on the following applications to conduct certain activities... requires that we invite public comment before issuing these permits. DATES: Comments on these permit...

  12. 40 CFR 52.1988 - Air contaminant discharge permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Air contaminant discharge permits. 52.1988 Section 52.1988 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1988 Air contaminant discharge permits. (a) Except for...

  13. 75 FR 54909 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2010-09-09

    ... (Gorilla gorilla), taken from the wild, or held in captivity, world wide for the purpose of scientific... applicant requests a permit to re-export the sport- hunted trophy of one male bontebok (Damaliscus pygargus... permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from...

  14. 75 FR 63196 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-10-14

    ... (Panthera tigris) to worldwide locations for the purpose of enhancement of the species. The permit numbers... Fish and Wildlife Service Endangered Species; Receipt of Applications for Permit AGENCY: Fish and... certain activities with endangered species. With some exceptions, the Endangered Species Act (ESA...

  15. Waste Feed Delivery Environmental Permits and Approvals Plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    2000-01-01

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches

  16. 40 CFR 147.2929 - Administrative permitting procedures.

    Science.gov (United States)

    2010-07-01

    ... location of the injection well; (iii) Nature of activity; (iv) A statement that EPA will be preparing a...; (ii) Name and address of permit applicant or permittee; (iii) Brief description of nature of activity... effective immediately upon issuance. (i) Stays of contested permit conditions. If a request for review of a...

  17. 21 CFR 1312.13 - Issuance of import permit.

    Science.gov (United States)

    2010-04-01

    ... drug listed in Schedule III, IV, or V if he finds: (1) That the substance is crude opium, poppy straw... shall render it void and of no effect. Permits are not transferable. Each copy of the permit shall have... the Act (21 U.S.C. 952(a)(1) or (a)(2)(A)), the importation of approved narcotic raw material (opium...

  18. 77 FR 34059 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-06-08

    ...). Applicant: Desert Horn Safaris, El Paso, TX; PRT-73016A The applicant requests a captive-bred wildlife.... Applicant: Desert Horn Safaris, El Paso, TX; PRT-73017A The applicant requests a permit authorizing... requests a permit to import biological samples from American crocodiles (Crocodylus acutus) from the...

  19. 14 CFR 437.7 - Scope of an experimental permit.

    Science.gov (United States)

    2010-01-01

    ... experimental permit. An experimental permit authorizes launch or reentry of a reusable suborbital rocket. The... ground operation includes each operation that— (1) Takes place at a U.S. launch site; and (2) Meets the... initiating flight, (iii) Is unique to space launch, and (iv) Is inherently so hazardous as to warrant the FAA...

  20. 75 FR 69699 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-11-15

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  1. 77 FR 51042 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-08-23

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  2. 78 FR 37840 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-06-24

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act of 1973, as amended (Act), prohibits activities with endangered and threatened species unless a Federal permit allows such activity...

  3. 78 FR 57650 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-19

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  4. 77 FR 71818 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-12-04

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  5. 75 FR 79387 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-12-20

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  6. 75 FR 20857 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-04-21

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  7. 75 FR 53708 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-09-01

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  8. 76 FR 70160 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-11-10

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  9. 78 FR 55287 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-10

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  10. 14 CFR 21.197 - Special flight permits.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Special flight permits. 21.197 Section 21.197 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Airworthiness Certificates § 21.197 Special flight permits. (a...

  11. Wilderness Management... A Computerized System for Summarizing Permit Information

    Science.gov (United States)

    Gary H. Elsner

    1972-01-01

    Permits were first needed for visits to wilderness areas in California during summer 1971. A computerized system for analyzing these permits and summarizing information from them has been developed. It produces four types of summary tables: point-of-origin of visitors; daily variation in total number of persons present; variations in group size; and variations in...

  12. 40 CFR 97.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.223 Section 97.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR SO2...

  13. 40 CFR 96.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.223 Section 96.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  14. 40 CFR 96.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.123 Section 96.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  15. 40 CFR 97.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.123 Section 97.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR NOX...

  16. 40 CFR 97.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.323 Section 97.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... authority, as necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision...

  17. 76 FR 39368 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-07-06

    ... promulgating migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or other.... The policy memorandum and conditions govern current administration of Federal Migratory Bird Special...

  18. 76 FR 67650 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-11-02

    ... and suggestions on migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or... and held in ``temporary'' caging for extended periods of time, i.e., multiple birds held in a trailer...

  19. 45 CFR 46.306 - Permitted research involving prisoners.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Permitted research involving prisoners. 46.306... Prisoners as Subjects § 46.306 Permitted research involving prisoners. (a) Biomedical or behavioral research conducted or supported by DHHS may involve prisoners as subjects only if: (1) The institution responsible...

  20. Towards an advanced mechanism to benefit from information systems in issuance of building permits

    Directory of Open Access Journals (Sweden)

    Mona M. Abdel Wahed

    2012-04-01

    Full Text Available Issuing building permits process in Egypt faces many problems and difficulties. These difficulties are a result of many causes which maybe lack of experience in examining documents, the municipal personnel are not suitable to the tasks assigned to them, multiplicity of agencies taking approval on building permits, lack of databases and using traditional methods of accomplishing the work. In order to overcome most of these difficulties, the local government should utilize the new technologies because it has many capabilities and advantages. Geographic information system is a powerful technology that can support the municipalities in implementing their duties. Many municipalities today are using this powerful technology to improve the quality of decision-making, facilitate information sharing among officials and with the public, making municipal information and transactions easily accessible via the internet and make dramatic change in public presentations, reports and municipal web sites. In order to implement and manage the GIS system, some steps must be done to insure the success of the information system. The key factor in developing management strategies for the introduction, implementation, integration, and operation of GIS in any organization is to determine the appropriate role of GIS in the organization and to understand the implications of that role. This paper will discuss and demonstrate the importance of urban development control, the difficulties facing the process of issuing building permits, the importance of GIS in issuing permits and finally importance of developing strategies for the success of implementing and managing GIS in the organization.

  1. Tradable CO2 permits in Danish and European energy policy

    DEFF Research Database (Denmark)

    Varming, S.; Eriksen, P.B.; Grohnheit, Poul Erik

    2000-01-01

    This report presents the results of the project "Tradable CO2 permits in Danish and European energy policy". The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operationbetween Elsamprojekt A/S (project manager......), Risø National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard tothe construction of a tradable CO_2 permit market as well as proposing a suitable design...... for a tradable CO_2 permit market for the energy sector in the EU. Experience from the tradable SO_2 permit market in the US is taken into consideration as well. Topresent an overview of price estimates of CO_2 and greenhouse gas permits in different models as well as discussing the assumptions leading...

  2. Improving regulatory effectiveness in Federal/State siting actions: Federal/State regulatory permitting actions in selected nuclear power station licensing cases

    International Nuclear Information System (INIS)

    Baroff, J.

    1977-06-01

    The Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states are documented. General observations regarding Federal/State siting roles in the siting process are included. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits

  3. Impact of the "Symmetric Instability of the Computational Kind" at mesoscale- and submesoscale-permitting resolutions

    Science.gov (United States)

    Ducousso, Nicolas; Le Sommer, J.; Molines, J.-M.; Bell, M.

    2017-12-01

    The energy- and enstrophy-conserving momentum advection scheme (EEN) used over the last 10 years in NEMO is subject to a spurious numerical instability. This instability, referred to as the Symmetric Instability of the Computational Kind (SICK), arises from a discrete imbalance between the two components of the vector-invariant form of momentum advection. The properties and the method for removing this instability have been documented by Hollingsworth et al. (1983), but the extent to which the SICK may interfere with processes of interest at mesoscale- and submesoscale-permitting resolutions is still unkown. In this paper, the impact of the SICK in realistic ocean model simulations is assessed by comparing model integrations with different versions of the EEN momentum advection scheme. Investigations are undertaken with a global mesoscale-permitting resolution (1/4 °) configuration and with a regional North Atlantic Ocean submesoscale-permitting resolution (1/60 °) configuration. At both resolutions, the instability is found to alter primarily the most energetic current systems, such as equatorial jets, western boundary currents and coherent vortices. The impact of the SICK is found to increase with model resolution with a noticeable impact at mesoscale-permitting resolution and a dramatic impact at submesoscale-permitting resolution. The SICK is shown to distort the normal functioning of current systems, by redirecting the slow energy transfer between balanced motions to a spurious energy transfer to internal inertia-gravity waves and to dissipation. Our results indicate that the SICK is likely to have significantly corrupted NEMO solutions (when run with the EEN scheme) at mesocale-permitting and finer resolutions over the last 10 years.

  4. 75 FR 19968 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2010-04-16

    ... FURTHER INFORMATION CONTACT: Donald Law, Office of Partnerships and Regulatory Assistance, EPA Region 8... that: (I) the title V permit fails to require compliance with particulate matter limits; and (II) the title V permit fails to ensure compliance with Prevention of Significant Deterioration (PSD...

  5. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental... raise these issues during the comment period or that the grounds for objection or other issue arose...

  6. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  7. Hanford facility dangerous waste permit application, general information portion. Revision 3

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy's contractors are identified as ''co-operators'' and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ''operator'' elsewhere in the application is not meant to conflict with the contractors' designation as co-operators but rather is based on the contractors' contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  8. Hanford facility dangerous waste permit application, general information portion. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  9. Hanford Facility Dangerous Waste Permit Application, 222-S Laboratory Complex

    International Nuclear Information System (INIS)

    WILLIAMS, J.F.

    2000-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the 222-S Laboratory Complex (this document, DOE/RL-91-27). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the 222-S Laboratory Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this 222-S Laboratory Complex permit application documentation is current as of August 2000

  10. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ...; and if applicable, the name of any person or company (other than the owner) that manages the... floating processor, and the Registered Buyer must comply with the requirements of this paragraph (e) and of... shoreside processor of the United States or stationary floating processor may receive or process groundfish...

  11. 40 CFR 230.7 - General permits.

    Science.gov (United States)

    2010-07-01

    ... for specific human uses or by specific land or water management plans (e.g., areas regulated under an... in such category are similar in nature and similar in their impact upon water quality and the aquatic... water quality and the aquatic environment. (b) Evaluation process. To reach the determinations required...

  12. Improving the scientific misconduct hearing process.

    Science.gov (United States)

    Parrish, D M

    The overturning and withdrawal of several of the Office of Research Integrity's (ORI's) findings of scientific misconduct have called its role into question. The contested findings of scientific misconduct that have been tried before the hearing body have been based on lengthy and expensive ORI investigations. How could ORI have failed to prove its findings of scientific misconduct after the commitment of substantial resources that far exceed those devoted during institutional investigations? One reason may be that the current hearing process makes it difficult or impossible for ORI, institutions, or individuals to prove scientific misconduct. The hearing process has been criticized by discouraged whistleblowers who believe that their allegations of scientific misconduct should have been upheld, and by the accused for the expensive and protracted nature of the proceedings. The following article examines problems in the scientific misconduct hearing process and suggests that the process could be improved by letting administrative law judges, patent attorneys, and a scientific majority decide these cases.

  13. 40 CFR 96.184 - Opt-in process.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Opt-in process. 96.184 Section 96.184... § 96.184 Opt-in process. The permitting authority will issue or deny a CAIR opt-in permit for a unit... continuing until a CAIR opt-in permit is denied under § 96.184(f) or, if a CAIR opt-in permit is issued, the...

  14. Political and Economic Scope for Permit Markets in Europe

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    1999-01-01

    (organized polluters) due to the possibility of a free, initial distribution (grand-fathering). As such, a mix of green taxes (in relation to non-organized interests) and grandfathered permit markets (in relation to organized interests) should be considered in the search for cost-effective and politically...... of permit markets in the US. Therefore, the policy recommendation for e.g. CO2 reduction in Europe is to apply taxation in relation to large and non-organized groups only, such as households and the transportation sector. A permit market, on the other hand, is politically more attrac-tive to the industry...

  15. Periodic Monitoring Guidance for Title V Operating Permits Programs

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  16. White Paper for Streamlined Development of Part 70 Permit Applications

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  17. Enforcing Transferable Permit Systems in the Presence of Market Power

    International Nuclear Information System (INIS)

    Chavez, C.A.; Stanlund, J.K.

    2003-01-01

    We derive an enforcement strategy for a transferable permit system in the presence of market power that achieves complete compliance in a cost-effective manner. We show that the presence of a firm with market influence makes designing an enforcement strategy more difficult than enforcing a perfectly competitive system. We also re-consider the suggestion that a firm with market influence should be allocated permits so that it chooses to not participate in the permit market. When enforcement and its costs are taken into account, that suggestion does not hold except in a very special case

  18. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  19. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Wave Energy Devices

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-06-01

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects. Costs have been developed at the pilot scale and for commercial arrays for a surge wave energy converter

  20. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Oscillating Water Column Wave Energy Devices

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects, as well as expert opinion of marine environmental research professionals. Cost estimates have been developed at the pilot and commercial scale. The reference model described in this document is an oscillating water column device deployed in Northern California at approximately 50 meters water depth.

  1. Air Permitting Implications of a Biorefinery Producing Raw Bio-Oil in Comparison with Producing Gasoline and Diesel Blendstocks

    Energy Technology Data Exchange (ETDEWEB)

    Bhatt, Arpit H [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhang, Yi Min [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-01

    A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major source threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.

  2. 75 FR 30428 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-06-01

    ... street addresses of respondents, will be available for public review at the address listed under..., Seattle, WA; PRT-212570 The applicant requests an amendment to the permit for incidental harassment for...

  3. 15 CFR 971.415 - Duration of a permit.

    Science.gov (United States)

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS Issuance/Transfer... allowance for deviation from the recovery plan for good cause, such as significantly changed market...

  4. 78 FR 14110 - Emergency Issuance of Endangered Species Permit

    Science.gov (United States)

    2013-03-04

    .... Permit Application Number: TE-96401A. Applicant: St. Thomas Response and Rehabilitation, Coral World... greater than 45 days, a single green sea turtle for veterinary treatment or euthanasia under certain...

  5. NPDES Permit for National World War II Memorial

    Science.gov (United States)

    Under National Pollutant Discharge Elimination System permit number DC0000345, the National World War II Memorial is authorized to discharge from a facility located at 17th St. and Independence Ave., S.W. Washington DC 20024.

  6. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1992-01-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations

  7. 75 FR 12255 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-03-15

    ... Health and Sciences University, Portland, OR, PRT-01458A The applicant requests a permit to acquire from... to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a...

  8. 77 FR 58213 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-09-19

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Actions on Special Permit Applications AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT... Corinne, UT. commerce soils containing solid explosive compounds (not greater than 3%) in bulk. (mode 1...

  9. NPDES Permit for Crow Nation Water Treatment Plants in Montana

    Science.gov (United States)

    Under NPDES permit MT-0030538, the U.S. Bureau of Indian Affairs is authorized to discharge from the Crow Agency water treatment plants via the wastewater treatment facility located in Bighorn County, Montana to the Little Bighorn River.

  10. 77 FR 3493 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2012-01-24

    ..., Moseley, VA; PRT-57466A. The applicant requests a permit to import 6 female captive-born cheetahs (Acinonyx jubatus jubatus) from De Wildt Cheetah Breeding Centre, De Wildt, South Africa for the purpose of...

  11. 77 FR 64121 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-10-18

    ... tigers (Panthera tigris) for the purpose of enhancement of the survival of the species from Alexander... of their permits to re-export and re-import three captive born tigers (Panthera tigris) to worldwide...

  12. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... presentation of credentials and other documents as may be required by law, to: (1) Enter upon the permittee's... a permit condition or malfunction of the injection system which may cause fluid migration into or...

  13. Storm Water General Permit 3 for Rock and Asphalt

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #3 for storm water discharges associated with industrial activity for Asphalt Plants, Concrete Batch Plants, Rock Crushing Plants and Construction...

  14. EPA Office of Water (OW): Pollutant Discharge Permit Status

    Data.gov (United States)

    U.S. Environmental Protection Agency — U.S. States (Generalized) represents the 50 states and the District of Columbia of the United States joined with data from the NPDES Permit Backlog Report for the...

  15. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  16. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1992-01-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards

  17. EPA Office of Water (OW): NPDES Permitted Facilities

    Data.gov (United States)

    U.S. Environmental Protection Agency — Spatial layer of the NPDES permitted facilities and their attributes. The layer contains attributes from two materialized views of tables that OECA maintains of...

  18. 77 FR 49483 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-08-16

    ... modify the special permit Town, South Africa. 178.277(b)(1). to increase the water capacity from 17000.... packaging with a capacity greater than 450 liters. (mode 1). 15617-N Veolia ES Technical 49 CFR 173.192, Sec...

  19. 75 FR 53689 - Issuance of an Experimental Use Permit

    Science.gov (United States)

    2010-09-01

    ... INFORMATION CONTACT: Gina Casciano, Biopesticides and Pollution Prevention Division (7511P), Office of..., Experimental use permits. Dated: August 19, 2010. W. Michael McDavit, Acting Director, Biopesticides and...

  20. Resource Conservation and Recovery Act: Part B, Permit application

    International Nuclear Information System (INIS)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements

  1. 9 CFR 72.13 - Permitted dips and procedures.

    Science.gov (United States)

    2010-01-01

    ... proprietary brands of permitted dips—as well the use of compressed air, vat management techniques, and other... maintained and that under actual field conditions the dipping of cattle with a solution of definite strength...

  2. Storm Water General Permit 1 for Industrial Facilities

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #1 for storm water discharges associated with industrial facilities in Iowa for the National Pollutant Discharge Elimination System (NPDES) program.

  3. 75 FR 82409 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-12-30

    ... reissuance of their permit for scientific research with two captive-born giant pandas (Ailuropoda melanoleuca... provisions of the USFWS Giant Panda Policy. The proposed research will cover all aspects of behavior...

  4. Transportation of Large Wind Components: A Permitting and Regulatory Review

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cook, Jeff [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This report summarizes permitting and regulatory issues associated with transporting wind turbine blades, towers, and nacelles as well as large transformers (wind components). These wind components are commonly categorized as oversized and overweight (OSOW) and require specific permit approvals from state and local jurisdictions. The report was developed based on a Quadrennial Energy Review (QER) recommendation on logistical requirements for the transportation of 'oversized or high-consequence energy materials, equipment, and components.'

  5. Hanford facility dangerous waste permit application, 242-A evaporator

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, 'operating' treatment, storage, and/or disposal units, such as the 242-A Evaporator (this document, DOE/RL-90-42)

  6. Hanford facility dangerous waste permit application, PUREX storage tunnels

    International Nuclear Information System (INIS)

    Price, S.M.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997

  7. 300 Area Treated Effluent Disposal Facility permit reopener run plan

    International Nuclear Information System (INIS)

    Olander, A.R.

    1995-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is authorized to discharge treated effluent to the Columbia River by National Pollutant Discharge Elimination System permit WA-002591-7. The letter accompanying the final permit noted the following: EPA recognizes that the TEDF is a new waste treatment facility for which full scale operation and effluent data has not been generated. The permit being issued by EPA contains discharge limits that are intended to force DOE's treatment technology to the limit of its capability.'' Because of the excessively tight limits the permit contains a reopener clause which may allow limits to be renegotiated after at least one year of operation. The restrictions for reopening the permit are as follows: (1) The permittee has properly operated and maintained the TEDF for a sufficient period to stabilize treatment plant operations, but has nevertheless been unable to achieve the limitation specified in the permit. (2) Effluent data submitted by the permittee supports the effluent limitation modifications(s). (3) The permittee has submitted a formal request for the effluent limitation modification(s) to the Director. The purpose of this document is to guide plant operations for approximately one year to ensure appropriate data is collected for reopener negotiations

  8. 25 CFR 166.219 - How do I acquire a permit through negotiation?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How do I acquire a permit through negotiation? 166.219... PERMITS Permit Requirements Obtaining A Permit § 166.219 How do I acquire a permit through negotiation? (a...) Upon the conclusion of negotiations with the Indian landowners or their representatives, and the...

  9. 40 CFR 72.73 - State issuance of Phase II permits.

    Science.gov (United States)

    2010-07-01

    ... Administrator under § 72.71 shall be responsible for administering and enforcing Acid Rain permits effective in... administering and enforcing Acid Rain permits, the State permitting authority shall comply with the procedures... enforcing Acid Rain permits, shall: (i) On or before December 31, 1997, issue an Acid Rain permit for Phase...

  10. 25 CFR 166.223 - Can I use a permit as collateral for a loan?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can I use a permit as collateral for a loan? 166.223 Section 166.223 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Permit Requirements Permit (leasehold) Mortgage § 166.223 Can I use a permit as collateral for a...

  11. 40 CFR 60.4123 - Hg budget permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit contents and term. 60... Coal-Fired Electric Steam Generating Units Permits § 60.4123 Hg budget permit contents and term. (a) Each Hg Budget permit will contain, in a format prescribed by the permitting authority, all elements...

  12. 25 CFR 166.227 - How can Indian land be removed from an existing permit?

    Science.gov (United States)

    2010-04-01

    ... the grazing capacity to reflect the removal of Indian land and show it on the permit. ... GRAZING PERMITS Permit Requirements Modifying A Permit § 166.227 How can Indian land be removed from an... to such interests; (3) A tribe allocates grazing privileges for Indian land covered by your permit...

  13. 76 FR 74755 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2011-12-01

    ... Region 5 Office, 77 West Jackson Boulevard, Chicago, Illinois 60604. If you wish to examine these... Significant Deterioration permit issued by EPA in 1979 did not allow Carmeuse to burn petroleum coke as a fuel...

  14. 77 FR 61605 - Notice of Proposed NPDES General Permit; Final NPDES General Permit for New and Existing Sources...

    Science.gov (United States)

    2012-10-10

    ... the Region's responses to comments and the final permit may be obtained from the EPA Region 6 internet... discharges containing methanol up to 20 bbl/ event and ethylene glycol up to 200 bbl/event; 5. Change the...

  15. Vaccination refusal. Autonomy and permitted coercion.

    Science.gov (United States)

    Grzybowski, Andrzej; Patryn, Rafał K; Sak, Jarosław; Zagaja, Anna

    2017-06-01

    The article presents vaccination obligation in relation to the existing or newly enacted legislation. Mass vaccinations and a wave of criticism they cause, forces us to reflect on the limits of medical intervention in the human body and the boundaries granted to individual's freedom and autonomy. This problem is universal and exists mainly in countries without mandatory vaccinations. Analyzing recent years, it must be underlined that a process in some legislatures has been introduced to enforce various forms of vaccination coercion. Although, refusing vaccinations has been treated liberally, the last wave of epidemics in the United States and Europe forced the creation of a different approach. Gradually in the USA, a duty (not a 'coercion') of vaccination is being enforced. Occurring epidemics, (e.g. measles) and dangers resulting from them, force authorities to violate the principle of autonomy and restrict individuals' freedoms regarding their own body. The article presents legal solutions relating to vaccinations in the United States and Europe i.e. administrative decisions imposing vaccinations, solutions conditioning social existence and financial penalties for not complying with this obligation and proposes a solution based on financial liability that will balance out patients' autonomy and public security.

  16. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Operating Permit (Permit Number: V-UO-000979-2017.00), statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Andeavor Walker Hollow Compressor Station.

  17. Building Permits, Building Permits exist in tabular form. We link on the PIN # to get parcel boundaries with building permits. The parcels and the building permits table join is a many to many relationship., Published in 2010, 1:2400 (1in=200ft) scale, Effingham County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Building Permits dataset current as of 2010. Building Permits exist in tabular form. We link on the PIN # to get parcel boundaries with building permits. The parcels...

  18. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    Science.gov (United States)

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  19. The political economy of a tradable GHG permit market in the European Union

    International Nuclear Information System (INIS)

    Markussen, P.; Tinggaard Svendsen, G.; Vesterdal, M.

    2002-01-01

    The EU has committed itself to meet an 8% greenhouse gas (GHG) reduction target level following the Kyoto agreement. Therefore, the EU Commission has just proposed a new directive establishing a framework for GHG emissions trading within the European Union. This proposal is to outcome a policy process started by the EU Commission and its Green Paper from March 2000. The main industrial stake holders all had the opportunity to comment on the Green Paper and from their directive proposal. Here, we find that the dominant interest groups indeed influenced the final design of an EU GHG market. This industrial rent-seeking most prominently lead to a grand fathered permit allocation rule like the one found in the US tradable permit systems. (au)

  20. The political economy of a tradable GHG permit market in the European Union

    Energy Technology Data Exchange (ETDEWEB)

    Markussen, P.; Tinggaard Svendsen, G.; Vesterdal, M.

    2002-07-01

    The EU has committed itself to meet an 8% greenhouse gas (GHG) reduction target level following the Kyoto agreement. Therefore, the EU Commission has just proposed a new directive establishing a framework for GHG emissions trading within the European Union. This proposal is to outcome a policy process started by the EU Commission and its Green Paper from March 2000. The main industrial stake holders all had the opportunity to comment on the Green Paper and from their directive proposal. Here, we find that the dominant interest groups indeed influenced the final design of an EU GHG market. This industrial rent-seeking most prominently lead to a grand fathered permit allocation rule like the one found in the US tradable permit systems. (au)

  1. Innovative options for structuring oil and gas leases and exploration permits on Aboriginal lands

    International Nuclear Information System (INIS)

    Douglas, W.; Wells, M.

    1999-01-01

    Operations in the oil and gas industry that involve exploration and production on Aboriginal lands are definitely more complex than operations on provincial Crown lands and there is clearly a need to meet different objectives. There are many good reasons for a petroleum exploration company to make a risk investment on First Nation lands, and the governing legislation permits considerable latitude in the terms of exploration permits and production leases. Indian Oil and Gas Canada will have to approve any agreement negotiated with a First Nation, so they must be made part of the deal-making process. It is important to recognize the responsibility a company has as a partner of a First Nation to help them achieve the maximum benefits from this non-renewable resource. Aspects considered include: the participants and their needs; terms and conditions in oil and gas leases; innovative compensation models; marketing the royalty share; equity participation, and managing exploration and development risk

  2. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  3. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  4. Hanford facility dangerous waste permit application, general information portion

    International Nuclear Information System (INIS)

    Hays, C.B.

    1998-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report)

  5. Hanford facility dangerous waste permit application, general information portion

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1998-05-19

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).

  6. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Protection and Technical Services

    2009-09-30

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  7. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    International Nuclear Information System (INIS)

    2009-01-01

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  8. 1993 RCRA Part B permit renewal application, Savannah River Site: Volume 10, Consolidated Incineration Facility, Section C, Revision 1

    International Nuclear Information System (INIS)

    Molen, G.

    1993-08-01

    This section describes the chemical and physical nature of the RCRA regulated hazardous wastes to be handled, stored, and incinerated at the Consolidated Incineration Facility (CIF) at the Savannah River Site. It is in accordance with requirements of South Carolina Hazardous Waste Management Regulations R.61-79.264.13(a) and(b), and 270.14(b)(2). This application is for permit to store and teat these hazardous wastes as required for the operation of CIF. The permit is to cover the storage of hazardous waste in containers and of waste in six hazardous waste storage tanks. Treatment processes include incineration, solidification of ash, and neutralization of scrubber blowdown

  9. Modeling and Computation of Transboundary Industrial Pollution with Emission Permits Trading by Stochastic Differential Game.

    Directory of Open Access Journals (Sweden)

    Shuhua Chang

    Full Text Available Transboundary industrial pollution requires international actions to control its formation and effects. In this paper, we present a stochastic differential game to model the transboundary industrial pollution problems with emission permits trading. More generally, the process of emission permits price is assumed to be stochastic and to follow a geometric Brownian motion (GBM. We make use of stochastic optimal control theory to derive the system of Hamilton-Jacobi-Bellman (HJB equations satisfied by the value functions for the cooperative and the noncooperative games, respectively, and then propose a so-called fitted finite volume method to solve it. The efficiency and the usefulness of this method are illustrated by the numerical experiments. The two regions' cooperative and noncooperative optimal emission paths, which maximize the regions' discounted streams of the net revenues, together with the value functions, are obtained. Additionally, we can also obtain the threshold conditions for the two regions to decide whether they cooperate or not in different cases. The effects of parameters in the established model on the results have been also examined. All the results demonstrate that the stochastic emission permits prices can motivate the players to make more flexible strategic decisions in the games.

  10. AIR PERMIT COMPLIANCE FOR WASTE RETRIEVAL OEPRATIONS INVOLVING MULTI-UNIT EMISSIONS

    International Nuclear Information System (INIS)

    SIMMONS FM

    2007-01-01

    Since 1970, approximately 38,000 suspect-transuranic and transuranic waste containers have been placed in retrievable storage on the Hanford Site in the 200 Areas burial grounds. Hanford's Waste Retrieval Project is retrieving these buried containers and processing them for safe storage and disposition. Container retrieval activities require an air emissions permit to account for potential emissions of radionuclides. The air permit covers the excavation activities as well as activities associated with assaying containers and installing filters in the retrieved transuranic containers lacking proper venting devices. Fluor Hanford, Inc. is required to track radioactive emissions resulting from the retrieval activities. Air, soil, and debris media contribute to the emissions and enabling assumptions allow for calculation of emissions. Each of these activities is limited to an allowed annual emission (per calendar year) and .contributes to the overall total emissions allowed for waste retrieval operations. Tracking these emissions is required to ensure a permit exceedance does not occur. A tracking tool was developed to calculate potential emissions in real time sense. Logic evaluations are established within the tracking system to compare real time data against license limits to ensure values are not exceeded for either an individual activity or the total limit. Data input are based on field survey and workplace air monitoring activities. This tracking tool is used monthly and quarterly to verify compliance to the license limits. Use of this tool has allowed Fluor Hanford, Inc. to successfully retrieve a significant number of containers in a safe manner without any exceedance of emission limits

  11. Auction Design for the Allocation of Emission Permits in the Presence of Market Power

    International Nuclear Information System (INIS)

    Sunnevaag, K.J.

    2003-01-01

    To the extent that emission permits have been allocated using market mechanisms, this has been done using a sealed-bid auction design, typically with discriminatory prices. However, several authors have recommended the ascending auction format. Basically, two 'competing' ascending auction designs have been suggested, the standard ascending auction (with clock or demand schedules), or an alternative ascending-clock implementation of Vickrey-pricing. The latter design was introduced as a response to problems of bid shading under the sealed-bid and the standard ascending auction format. The purpose of this paper is to investigate the allocation of permits under these two alternative mechanisms. The auction process and the resulting market outcome in the presence of oligopolistic competition are simulated. In this setting, it is not obvious that bid shading is the optimal strategy under the standard design, nor is it obvious that sincere bidding is the optimal strategy under the alternative ascending auction design. The alternative auction format makes it less costly to pursue a strategy to increase market shares through the acquisition of emission permits, thus increasing the competitor's costs, leading to overbidding as the optimal strategy

  12. Bill project aiming at abrogating exclusive search permits for unconventional hydrocarbon searches, and at prohibiting their exploration and exploitation of the national territory

    International Nuclear Information System (INIS)

    2011-01-01

    After having briefly recalled the origin of shale gases, their extraction process and the evolution of their production in the USA, the authors outline the extremely negative environmental impacts of the fracking technique (hydraulic fracturing): water pollution, air pollution, soil pollution, existence of numerous drilling sites which would degrade landscapes, water and soil contamination risks. As some search permits have already been awarded, and while taking these negative consequences into account, the authors propose a bill project to prohibit these explorations, to abrogate the existing permits, and to ensure public information before bestowing such search permits and exploitation concessions

  13. Order Responding to October 2, 2003 Petition Requesting the Administrator Object to Permit Amendment of Cargill's Title V Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  15. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-06-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION... the Federal pipeline safety laws, PHMSA is publishing this notice of special permit request we have... seeking relief from compliance with certain plastic pipe design requirements in the Federal pipeline...

  16. 77 FR 14035 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-03-08

    ... The applicant requests a permit to export 15 live, captive-born St. Vincent parrots (Amazona... the applicant over a 5-year period. Applicant: Morani River Ranch, Uvalde, TX; PRT-46687A The... a 5-year period. Applicant: Morani River Ranch, Uvalde, TX; PRT-49112A The applicant requests...

  17. 7 CFR 352.5 - Permit; requirement, form and conditions.

    Science.gov (United States)

    2010-01-01

    ... Section 352.5 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE PLANT QUARANTINE SAFEGUARD REGULATIONS § 352.5 Permit..., or other movement into or through the United States of plants, plant products, plant pests, and soil...

  18. 76 FR 39888 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-07-07

    ..., band, color band, release and monitor nests) the southwestern willow flycatcher (Empidonax traillii... permit to take (locate and monitor nests) the California least tern (Sterna antillarum browni) in... take (locate and monitor nests) the California least tern (Sterna antillarum browni) in conjunction...

  19. 77 FR 5045 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-02-01

    ... requests a permit to take (survey, locate, and monitor nests) the California least tern (Sterna antillarum... southwestern willow flycatcher (Empidonax traillii extimus) and take (locate and monitor nests) the least Bell...; and locate and monitor nests) the least Bell's vireo (Vireo bellii pusillus) in conjunction with...

  20. 76 FR 14424 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-03-16

    ..., 76 FR 7577) to take (harass by survey and monitor nests) the southwestern willow flycatcher... applicant requests a permit to take (harass by survey, monitor nests, and use cameras) the California least..., Ventura, California. The applicant requests apermit to take (harass by survey, locate, and monitor nests...

  1. 77 FR 12611 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-03-01

    ... (monitor nests) the least Bell's vireo (Vireo bellii pusillus) in conjunction with surveys and population... to take (monitor nests) the least Bell's vireo (Vireo bellii pusillus) in conjunction with surveys... applicant requests a permit to take (harass by survey and monitor nests) the southwestern willow flycatcher...

  2. 47 CFR 90.159 - Temporary and conditional permits.

    Science.gov (United States)

    2010-10-01

    ... SERVICES PRIVATE LAND MOBILE RADIO SERVICES Applications and Authorizations § 90.159 Temporary and conditional permits. (a) An applicant for a license under this part (other than a commercial mobile radio... minimum of ten business days has passed between submission of the application to the Commission and the...

  3. 40 CFR 232.3 - Activities not requiring permits.

    Science.gov (United States)

    2010-07-01

    ... States, or if it does not involve a discharge, it does not need a section 404 permit whether or not it... irrigation ditches or the maintenance (but not construction) of drainage ditches. Discharge associated with... appurtenant and functionally related to irrigation ditches are included in this exemption. (4) Construction of...

  4. 33 CFR 323.4 - Discharges not requiring permits.

    Science.gov (United States)

    2010-07-01

    ... States, or if it does not involve a discharge, it does not need a section 404 permit, whether or not it... exemption. (3) Construction or maintenance of farm or stock ponds or irrigation ditches, or the maintenance... related to irrigation ditches are included in this exemption. (4) Construction of temporary sedimentation...

  5. 19 CFR 12.7 - Permits required for importation.

    Science.gov (United States)

    2010-04-01

    ... showing in clear and legible type the product (raw milk, pasteurized milk, raw cream, or pasteurized cream... THE TREASURY SPECIAL CLASSES OF MERCHANDISE Milk and Cream § 12.7 Permits required for importation. (a... Federal Import Milk Act, the importation into the United States of milk and cream is prohibited unless the...

  6. 76 FR 27307 - Marine Mammals; Photography Permit Application No. 16360

    Science.gov (United States)

    2011-05-11

    ... Mammals; Photography Permit Application No. 16360 AGENCY: National Marine Fisheries Service (NMFS... commercial/educational photography of cetaceans off Hawaii. DATES: Written, telefaxed, or e-mail comments... CFR part 216). Section 104(c)(6) provides for photography for educational or commercial purposes...

  7. Starlight excitation of permitted lines in the Orion Nebula

    International Nuclear Information System (INIS)

    Grandi, S.A.

    1975-01-01

    From an idealized model of the Orion Nebula and from an analysis of line ratios it is shown that direct starlight excitation of the permitted O I line dominates over recombination and Lyman line fluorescence. The line strengths predicted by this mechanism agree reasonably well with those observed in the Orion Nebula. The application of direct starlight excitation to other ions is also discussed

  8. 78 FR 42540 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2013-07-16

    ... be to the disadvantage of the listed species, and that the terms and conditions of the permit were... UNIVERSITY 207948 3/4/2013 12/31/2017 WESTERN ECOSYSTEMS TECHNOLOGY, INC 050706 10/1/2012 12/31/2015 WESTERN...

  9. Intertemporal Permit Trading for the Control of Greenhouse Gas Emissions

    Energy Technology Data Exchange (ETDEWEB)

    Leiby, P. [Energy Division, Oak Ridge National Laboratory, P.O. Box 2008, M.S. 6205, Oak Ridge, TN (United States); Rubin, J. [Margaret Chase Smith Center for Public Policy, Department of Resource, Economics and Policy, The University of Maine, 5715 Coburn, Orono, Maine (United States)

    2001-07-01

    This paper integrates two themes in the intertemporal permit literature through the construction of an intertemporal banking system for a pollutant that creates both stock and flow damages. A permit banking system for the special case of a pollutant that only causes stock damages is also developed. This latter, simpler case corresponds roughly to the greenhouse gas emission reduction regime proposed by the U.S. Department of State as a means of fulfilling the U.S. commitment to the Framework Convention on Climate Change. This paper shows that environmental regulators can achieve the socially optimal level of emissions and output through time by setting the correct total sum of allowable emissions, and specifying the correct intertemporal trading ratio for banking and borrowing. For the case of greenhouse gases, we show that the optimal growth rate of permit prices, and therefore the optimal intertemporal trading rate, has the closed-form solution equal to the ratio of current marginal stock damages to the discounted future value of marginal stock damages less the decay rate of emissions in the atmosphere. Given a non-optimal negotiated emission path we then derive a permit banking system that has the potential to lower net social costs by adjusting the intertemporal trading ratio taking into account the behavior of private agents. We use a simple numerical simulation model to illustrate the potential gains from various possible banking systems. 24 refs.

  10. 77 FR 2037 - Marine Mammals; Photography Permit File No. 17032

    Science.gov (United States)

    2012-01-13

    ... filmmaker hopes to document the behavior of marine animals in the presence of a gray whale carcass. Filming... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA929 Marine Mammals; Photography Permit File No. 17032 AGENCY: National Marine Fisheries Service (NMFS), National...

  11. 77 FR 24470 - Marine Mammals; Photography Permit File No. 17032

    Science.gov (United States)

    2012-04-24

    ... behavior of marine animals in the presence of a gray whale carcass. Filming will occur between April and... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA929 Marine Mammals; Photography Permit File No. 17032 AGENCY: National Marine Fisheries Service (NMFS), National...

  12. 34 CFR 395.35 - Terms of permit.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Terms of permit. 395.35 Section 395.35 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER...

  13. 50 CFR 660.334 - Limited entry permits-endorsements.

    Science.gov (United States)

    2010-10-01

    ... partnership fails to return the completed form by the deadline date of July 1, 2006, NMFS will send a second... Commerce as of the date of the decision. (4) Ownership requirements and limitations. (i) No partnership or corporation may own a limited entry permit with a sablefish endorsement unless that partnership or corporation...

  14. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... construction, the Director must establish permit conditions, including but not limited to allowable waste feeds...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... water (if any), ash residues, and other residues, for the purpose of estimating the fate of the trial...

  15. Chaparral Commerce Center Proposed Tribal Minor NSR Permit Application

    Science.gov (United States)

    Tribal Minor New Source Review (NSR) Permit application for the two emergency diesel-fired generators (1,500 kW each) to be installed at the Chaparral Commerce Center in the Salt River Pima-Maricopa Indian Community (SRPMIC) in Scottsdale, Arizona.

  16. 75 FR 11193 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-03-10

    ...] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... employees and their designated agents to conduct enhancement of survival activities for a plant that was recently added to the List of Endangered and Threatened Plants (Phyllostegia hispida). The Endangered...

  17. Resource Conservation and Recovery Act, Part B, Permit Application

    International Nuclear Information System (INIS)

    1991-01-01

    This report is part of the permit application for the WIPP facility. Appendices are presented on the following: the design validation final report; sampling of volatile organic compounds which may be emitted from waste binss, site supplementary roof support system, and studies on wind and tornado probabilities

  18. Intertemporal Permit Trading for the Control of Greenhouse Gas Emissions

    International Nuclear Information System (INIS)

    Leiby, P.; Rubin, J.

    2001-01-01

    This paper integrates two themes in the intertemporal permit literature through the construction of an intertemporal banking system for a pollutant that creates both stock and flow damages. A permit banking system for the special case of a pollutant that only causes stock damages is also developed. This latter, simpler case corresponds roughly to the greenhouse gas emission reduction regime proposed by the U.S. Department of State as a means of fulfilling the U.S. commitment to the Framework Convention on Climate Change. This paper shows that environmental regulators can achieve the socially optimal level of emissions and output through time by setting the correct total sum of allowable emissions, and specifying the correct intertemporal trading ratio for banking and borrowing. For the case of greenhouse gases, we show that the optimal growth rate of permit prices, and therefore the optimal intertemporal trading rate, has the closed-form solution equal to the ratio of current marginal stock damages to the discounted future value of marginal stock damages less the decay rate of emissions in the atmosphere. Given a non-optimal negotiated emission path we then derive a permit banking system that has the potential to lower net social costs by adjusting the intertemporal trading ratio taking into account the behavior of private agents. We use a simple numerical simulation model to illustrate the potential gains from various possible banking systems. 24 refs

  19. 43 CFR 7.34 - Procedural information for securing permits.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Procedural information for securing permits. 7.34 Section 7.34 Public Lands: Interior Office of the Secretary of the Interior PROTECTION OF ARCHAEOLOGICAL RESOURCES Department of the Interior Supplemental Regulations § 7.34 Procedural information for...

  20. Page | 158 PERMITTING A CERTAIN LEVEL OF DOPING IN ...

    African Journals Online (AJOL)

    Fr. Ikenga

    ARINZE-UMOBI & MBANUGO: Permitting a Certain Level of Doping in Sports as an Alternative Strategy for Tackling .... backgrounds, geographical environment and extent of access to training facilities inevitably intervene .... communal celebration of certain dimensions of human natural physical and mental endowments.

  1. 76 FR 54480 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-01

    ... specific as possible. Please confine your comments to issues for which we seek comments in this notice, and... hemionus) from the wild in Mongolia for the purpose of scientific research. Applicant: World Center for... History, New Haven, CT; PRT- 120045 The applicant requests a permit to export and reimport non-living...

  2. 76 FR 57757 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-16

    ... ESA law requires that we invite public comment before issuing these permits. DATES: We must receive... analyses of, the applicable laws and regulations. We will not consider or include in our administrative... Applications A. Endangered Species Applicant: Graham Banes, Miami, FL; PRT-49805A The applicant requests a...

  3. 30 CFR 778.12 - Providing permit history information.

    Science.gov (United States)

    2010-07-01

    ... date of submission of the application, and for any surface coal mining operation you or your operator... Section 778.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  4. 78 FR 53473 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-08-29

    ... commerce, export, and cull of excess scimitar-horned oryx (Oryx dammah), addax (Addax nasomaculatus), and...-13868B The applicant requests a permit authorizing interstate and foreign commerce, export, and cull of... variegata), red ruffed lemur (Varecia rubra), black lemur (Eulemur macaco), cotton-top tamarin (Saguinus...

  5. 48 CFR 52.236-7 - Permits and Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws... completion and acceptance of the entire work, except for any completed unit of work which may have been...

  6. 50 CFR 21.23 - Scientific collecting permits.

    Science.gov (United States)

    2010-10-01

    ... take, transport, or possess migratory birds, their parts, nests, or eggs for scientific research or... project involved; (4) Name and address of the public, scientific, or educational institution to which all... possessed under authority of a scientific collecting permit must be donated and transferred to the public...

  7. 50 CFR 21.12 - General exceptions to permit requirements.

    Science.gov (United States)

    2010-10-01

    ..., as amended (40 Stat. 755; 16 U.S.C. 703-(711), may, without a permit, take or otherwise acquire, hold in custody, transport, and dispose of migratory birds or their parts, nests, or eggs as necessary in performing their official duties. (b) Employees of certain public and private institutions: (b)(1) State game...

  8. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  9. 75 FR 52971 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-08-30

    ... permit to import seven captive-born tigers (Panthera tigris) from Canada and Mexico, for the purpose of... endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA) and.... Background To help us carry out our conservation responsibilities for affected species, the Endangered...

  10. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... improvement or construction of a bridge over navigable waters except for the exemption exercised by FHWA in... 23 Highways 1 2010-04-01 2010-04-01 false Bridges requiring a USCG permit. 650.807 Section 650.807... BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.807 Bridges requiring a USCG...

  11. 77 FR 64843 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-10-23

    ...--Motor vehicle, 2--Rail freight, 3--Cargo vessel, 4--Cargo aircraft only, 5--Passenger-carrying aircraft... fiberglass 172.244. reinforced plastic (GFRP) as the basic material of construction for DOT-412/407 type... transportation by cargo only aircraft. (mode 4) EMERGENCY SPECIAL PERMIT GRANTED 14483-M......... WEW 49 CFR To...

  12. 27 CFR 19.920 - Automatic termination of permits.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Automatic termination of permits. 19.920 Section 19.920 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Distilled Spirits For Fuel Use...

  13. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  14. 76 FR 7577 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-02-10

    ... requests a new permit for research and recovery purposes to conduct presence/absence surveys for golden...) Eskimo curlew (Numenius borealis) Fountain darter (Etheostoma fonticola) Golden-cheeked warbler... snowbells (Styrax texanus) Texas trailing phlox (Phlox nivalis spp. texensis) Texas wild-rice (Zizania...

  15. 50 CFR 25.55 - Refuge admission permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Refuge admission permits. 25.55 Section 25... (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ADMINISTRATIVE PROVISIONS Fees and Charges § 25.55 Refuge... onto an Entrance Fee Area will be available for issue or purchase at such area and, except for refuge...

  16. 40 CFR 221.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... of the proposed dumping on the marine environment, navigation, living and non-living marine resource... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Applications for permits. 221.1 Section 221.1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING...

  17. 75 FR 66073 - Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2010-10-27

    ... the Florida Keys and authorizes surveys year-round. The purpose of the research is to study the... sampling, and passive acoustics of 19 cetacean species. Research activities may occur year-round from the...: Permits, Conservation and Education Division, Office of Protected Resources, NMFS, 1315 East-West Highway...

  18. 78 FR 24305 - Actions on Special Permit Applications

    Science.gov (United States)

    2013-04-24

    ... Pipeline and Hazardous Materials Safety Administration Actions on Special Permit Applications AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of actions on Special... GRANTED 15743-N Midwest Cylinder, Inc., 49 CFR 180.211(c)(2)(i). To authorize the repair of Cleves, OH...

  19. 76 FR 63322 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-10-12

    ... and Wildlife Service, P.O. Box 1306, Room 6034, Albuquerque, NM at (505) 248-6920. Please refer to the...: Susan Jacobsen, Chief, Endangered Species Division, P.O. Box 1306, Albuquerque, NM 87103; (505) 248-6920... loggerhead (Caretta caretta) sea turtles within the Sea Life Center, Galveston, Texas. Permit TE-42739A...

  20. 76 FR 35235 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-06-16

    ..., Ecological Services, P.O. Box 1306, Room 6034, Albuquerque, NM 87103. Documents and other information.... FOR FURTHER INFORMATION CONTACT: Susan Jacobsen, Chief, Endangered Species Division, P.O. Box 1306... requests a new permit for husbandry and holding of green sea turtles (Chelonia mydas) and Kemps ridley sea...

  1. 76 FR 26313 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-05-06

    ..., Ecological Services, P.O. Box 1306, Room 6034, Albuquerque, NM 87103. Documents and other information.... FOR FURTHER INFORMATION CONTACT: Susan Jacobsen, Chief, Endangered Species Division, P.O. Box 1306.... Applicant requests a new permit for husbandry and holding of green sea turtles (Chelonia mydas), hawksbill...

  2. 77 FR 29450 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-05-17

    ... be noted that some of the sections cited were those in effect at the time certain special permits... compressed oxygen without rigid outer packaging when no other means of transportation exist. 10656-M... to SA Portugal. extend the external visual inspection to every five (5) years. 14808-M...

  3. 29 CFR 1910.146 - Permit-required confined spaces.

    Science.gov (United States)

    2010-07-01

    ... spaces. This section does not apply to agriculture, to construction, or to shipyard employment (Parts... paragraph (d)(14) of this section. Any problems encountered during an entry operation shall be noted on the... atmosphere of a permit space which may contain a hazardous atmosphere should be tested for residues of all...

  4. Unilateral regulation of bilateral trade in greenhouse gas emission permits

    NARCIS (Netherlands)

    Rehdanz, K.; Tol, R.S.J.

    2005-01-01

    This paper considers the coordination of domestic markets for tradable emission permits where countries determine their own emission reduction targets, using a two-country model. Linking such schemes is beneficial to both countries but may cause the exporting country to decrease its emission

  5. 76 FR 40926 - Receipt of Applications for Endangered Species Permits

    Science.gov (United States)

    2011-07-12

    ... the purpose of conducting presence/absence surveys, population monitoring, and ecological studies... presence/absence surveys, population monitoring, and ecological studies. This work will be conducted..., Puerto Rico, TE-125521. Applicant requests a permit amendment to house Puerto Rican parrots (Amazona...

  6. 78 FR 55091 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-09-09

    ... warbler (Dendroica chrysoparia) and black-capped vireo (Vireo atricapilla) within Texas. Permit TE-030115... conduct presence/absence surveys for the following species in Arizona, New Mexico, and Texas: Black-capped... silvery minnows (Hybognathus amarus) at the field station in Yankton, South Dakota. [[Page 55093

  7. 76 FR 71069 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-11-16

    ... two live, captive-born black-footed cats (Felis nigripes) to France, for the purpose of enhancement of...-born black-footed cats (Felis nigripes) to Denmark, for the purpose of enhancement of the survival of... Station, TX; PRT-56462A. Brenda Tapia, Program Analyst/Data Administrator, Branch of Permits, Division of...

  8. 45 CFR 670.28 - Content of permit application.

    Science.gov (United States)

    2010-10-01

    ... CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Antarctic Specially Protected Areas § 670.28 Content of permit... to enter an Antarctic Specially Protected Area shall include the following in the application: (a) A... demonstrating that the proposed action will not jeopardize the unique natural ecological system in that area...

  9. 27 CFR 555.49 - Issuance of license or permit.

    Science.gov (United States)

    2010-04-01

    ... satisfaction of the Chief, Firearms and Explosives Licensing Center, that the business or operations to be... Chief, Firearms and Explosives Licensing Center, will issue a license or permit if— (i) A properly..., Firearms and Explosives Licensing Center, will approve a properly executed application for a license or...

  10. 50 CFR 21.22 - Banding or marking permits.

    Science.gov (United States)

    2010-10-01

    ... permits shall be submitted by letter of application addressed to the Bird Banding Laboratory, Office of... address of the public, scientific, or educational institution to which any specimens will be donated that... public scientific or educational institution, birds killed or found dead as a result of the permittee's...

  11. 21 CFR 352.20 - Permitted combinations of active ingredients.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Permitted combinations of active ingredients. 352.20 Section 352.20 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... effective date was stayed until further notice. For the convenience of the user, the text is set forth as...

  12. 21 CFR 333.320 - Permitted combinations of active ingredients.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Permitted combinations of active ingredients. 333.320 Section 333.320 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... Note: At 75 FR 9776, Mar. 4, 2010, § 333.320 was revised, effective Mar. 4, 2011. For the convenience...

  13. 75 FR 41235 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-15

    ... enhancement of the survival of the species. Applicant: Earth Promise, Inc., dba Fossil Rim Wildlife Center... endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed species unless a Federal permit is issued that allows such activities. The ESA laws require that we invite...

  14. Potable Water Treatment Facility General Permit (PWTF GP) ...

    Science.gov (United States)

    2017-08-28

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  15. 78 FR 30327 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2013-05-22

    .... Applicant Federal Register notice Permit issuance date Endangered Species 65816A Lewis Henderson........ 77... FR 24510; April 24, June 1, 2012. 2012. 69106A Lewis Henderson........ 77 FR 24510; April 24, June 1... 11, 2012. 2012. 213382 Virginia Safari Park & 77 FR 26779; May 7, July 21, 2012. Preservation Center...

  16. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1993-01-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws

  17. Permitting plan for the high-level waste interim storage

    Energy Technology Data Exchange (ETDEWEB)

    Deffenbaugh, M.L.

    1997-04-23

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist.

  18. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  19. 78 FR 112 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-01-02

    ... (Pharomachrus mocinno) from Mexico for the purpose of enhancement of the survival of the species. Applicant: St... derived from captive-bred specimens of Ring-tailed lemur (Lemur catta) to Canada for the purpose of...-89184A The applicant requests a permit authorizing interstate and foreign commerce, export, and cull of...

  20. Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act_considered MAJOR permits

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act, considered "major" permits. Also includes emission points...

  1. 75 FR 3731 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Science.gov (United States)

    2010-01-22

    ... Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA exempts... permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or...

  2. 25 CFR 166.102 - Do tribal laws apply to permits?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Do tribal laws apply to permits? 166.102 Section 166.102 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Tribal Policies and Laws Pertaining to Permits § 166.102 Do tribal laws apply to permits? Tribal laws will apply...

  3. 40 CFR 72.31 - Information requirements for Acid Rain permit applications.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Information requirements for Acid Rain... (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.31 Information requirements for Acid Rain permit applications. A complete Acid Rain permit application shall include the...

  4. 40 CFR 72.69 - Issuance and effective date of acid rain permits.

    Science.gov (United States)

    2010-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.69 Issuance and effective date of acid rain permits. (a) After the close of the public comment period, the Administrator will issue or deny an Acid Rain permit. The Administrator will serve a copy of any Acid Rain...

  5. 77 FR 129 - Golden Eagles; Programmatic Take Permit Application; Draft Environmental Assessment; West Butte...

    Science.gov (United States)

    2012-01-03

    ...-FF01M01000] Golden Eagles; Programmatic Take Permit Application; Draft Environmental Assessment; West Butte... Golden Eagle Protection Act (BGEPA) from West Butte Wind Power, LLC, for a programmatic permit for the take of golden eagles. If issued, the permit would be the first programmatic permit issued under our...

  6. 77 FR 4825 - Golden Eagles; Programmatic Take Permit Application; Draft Environmental Assessment; West Butte...

    Science.gov (United States)

    2012-01-31

    ...-FF01M01000] Golden Eagles; Programmatic Take Permit Application; Draft Environmental Assessment; West Butte... an application for the programmatic take of golden eagles. The DEA evaluates alternatives for the... eagles. If issued, the permit would be the first programmatic permit issued under our new permitting...

  7. 40 CFR 72.72 - Criteria for State operating permit program.

    Science.gov (United States)

    2010-07-01

    ... operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... Administrator. (a) Non-Interference with Acid Rain Program. The State operating permit program shall not include... operation of the Acid Rain Program. (b) The State operating permit program shall require the following...

  8. 21 CFR 1210.25 - Permits for pasteurized milk or cream.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Permits for pasteurized milk or cream. 1210.25... UNDER THE FEDERAL IMPORT MILK ACT Permit Control § 1210.25 Permits for pasteurized milk or cream. Permits to ship or transport pasteurized milk or cream into the United States will be granted only upon...

  9. 25 CFR 161.402 - What are the procedures for reissuing permits?

    Science.gov (United States)

    2010-04-01

    ... provide the Grazing Committee and Resources Committee with the current carrying capacity and stocking rate... PARTITIONED LANDS GRAZING PERMITS Reissuance of Grazing Permits § 161.402 What are the procedures for reissuing permits? BIA, with the concurrence of the Navajo Nation, will reissue grazing permits only to...

  10. Unilateral regulation of bilateral trade in greenhouse gas emission permits

    International Nuclear Information System (INIS)

    Rehdanz, Katrin; Tol, Richard S.J.

    2005-01-01

    This paper considers the coordination of domestic markets for tradable emission permits where countries determine their own emission reduction targets, using a two-country model. Linking such schemes is beneficial to both countries but may cause the exporting country to decrease its emission reduction target and export more permits. This in turn would not only reduce the costs for both countries as less emissions have to be reduced, but it also lowers the environmental benefits of the importing country. One price instrument (tariff) and two quantity instruments (discount, quota) to prevent the exporting country from issuing more permits are examined. Each instrument restricts trade and alters the terms of trade for the two countries. The importing country (and regulator) prefers an import tariff and an import quota to a carbon discount. If the exporting country releases additional permits, the importing country should not try to keep total emissions constant, as that would be ineffective and maybe even counterproductive. Instead, the importing country should aim to keep the total import constant; this would impose costs on the exporting country that are independent of the policy instrument; an import quota would be the cheapest option for the importing country. An import quota would also stress the idea of supplementary of the flexible mechanism as it increases the share of emissions reduced domestically. Compliance and liability issues constrain the market further. However, both the importing and the exporting country would prefer that the permit seller is liable in case of non-compliance, as sellers' liability would less constrain the market

  11. 78 FR 77122 - Proposed Modification of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Science.gov (United States)

    2013-12-20

    ... required by section 553 of the Administrative Procedure Act (APA), or any other law, to publish general... entities.'' EPA has concluded that NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or the RFA. Notwithstanding that general permits are...

  12. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  13. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To... demonstrates that it was impracticable to raise these issues during the comment period or that the grounds for objection or other issue arose after the comment period. EPA received a petition from the Petitioners, dated...

  14. 78 FR 7428 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-02-01

    ... the March 28, 2011 petition, submitted by the Louisiana Environmental Action Network (LEAN), Sierra..., 2011 to Noranda Alumina, LLC, for the operation of the alumina production plant located in Gramercy, St... production plant in Gramercy, St. James Parish, Louisiana for the following reasons: (1) The Title V Permit...

  15. 77 FR 58988 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2012-09-25

    ... Objection to State Operating Permit for Cheyenne Light, Fuel & Power, Wygen II Power Plant AGENCY... to Cheyenne Light, Fuel & Power (CLF&P) for their Wygen II power plant (Wygen II). Pursuant to... final Order, the Petition, and other supporting information. You may view the hard copies Monday through...

  16. 76 FR 43684 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2011-07-21

    .... 112(j) for air toxics; and (VII) PSD requirements in regard to carbon dioxide emissions. On June 30... an operating permit issued by the Colorado Department of Public Health and Environment (CDPHE... PM emission limits (and fails to require the facility to sufficiently monitor fugitive PM emissions...

  17. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-construction permit... National Environmental Policy Act-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.75 Draft environmental impact statement—construction...

  18. Resource conversation and recovery act draft hazardous waste facility permit: Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1993-08-01

    Volume II contains attachments for Module II and Module III. Attachments for Module II are: part A permit application; examples of acceptable documentation; Waste Isolation Pilot Plant generator/storage site waste screening and acceptance audit program; inspection schedule and monitoring schedule; inspection log forms; personnel training course outlines; hazardous waste job position training requirements; contingency plan; closure plan; and procedures for establishing background for the underground units. One attachment, facility process information, is included for Module III. Remaining attachments for this module are in Volume III

  19. Legal Review: Issuance of Separate Permits for a Nuclear Reactor for Research

    International Nuclear Information System (INIS)

    Chang, Gun-Hyun; Kim, Sang-Wwon; Koh, Jae-Dong; Kim, Chang-Bum; Ahn, Sang-kyu

    2006-01-01

    With regard to the nuclear reactor permission system under the Atomic Energy Act of the Republic of Korea, two types of permits must be obtained for nuclear power reactors under Article 11 and Article 21 of the Atomic Energy Act: construction permits and operation permits. Concerning nuclear reactors for research, however, only one permit is required: a dual permit that authorizes both construction and operation, under Article 33 of said act. This permit can be obtained by submitting an application for a dual construction and operation permit to the regulatory authority. The question is whether a dual permit can be issued for nuclear reactors for research under any circumstances. If the literal provisions of the Atomic Energy Act are applied rigorously even in cases where it is realistically difficult to submit a dual permit application or issue a dual permit for construction and operation considering the power output, usage, and design complexity of nuclear reactors for research, separate permits for construction or operation shall never be issued, with only dual permits for construction and operation issued. For the Hanaro research reactor, a dual permit was issued with a condition attached thereto based on the literal provisions of the Atomic Energy Act at the time of its construction, although an application for and issuance of a dual permit for its construction and operation were impossible at the time. This is in violation of the purport of the law that provides for a dual permit

  20. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  1. Taxes, permits, and the diffusion of a new technology

    International Nuclear Information System (INIS)

    Coria, Jessica

    2009-01-01

    This study looks at the effects of the choice between taxes and permits on the pattern of adoption of a new (pollution) emissions abatement technology. It uses a dynamic setting, where the regulator observes the arrival and initial use of the technology and determines the optimal ex post amount of emissions before firms start to adopt the technology. In the model here, the adoption benefits and costs depend on the number of firms that are already using the technology. Thus, each firm decides the optimal date to adopt the technology, considering its benefits and costs, as well as the advantage they will gain over their rivals, producing a sequence of adoption that is ''diffused'' into the industry over time. With this framework, the study shows that when the output demand is elastic, auctioned permits induce an earlier diffusion than taxes. (author)

  2. Can a carbon permit system reduce Spanish unemployment?

    International Nuclear Information System (INIS)

    Faehn, Taran; Gomez-Plana, Antonio G.; Kverndokk, Snorre

    2009-01-01

    This paper analyses the impact of carbon policy on unemployment in Spain and whether recycling the public revenues earned from permit auctions can alleviate this problem. While Spain's deviation from the European Union's intermediate emission goals is more serious than most other member countries' unemployment in Spain is also well above average for the European Union. We use a computable general equilibrium model that includes unemployment in the markets for unskilled and skilled labour. We find that introducing carbon permits does not aggravate Spanish unemployment. In fact, if supplied with revenue recycling schemes, unemployment rates may actually fall. Contrary to other European studies, we find that the best option is to reduce payroll taxes on relatively skilled types of labour. This reform is successful in both increasing labour demand and dampening the supply response to rising wages. However, while all of the recycling schemes generate dividends in terms of aggregate welfare, none entirely offsets the abatement costs. (author)

  3. Taxes, permits, and the diffusion of a new technology

    Energy Technology Data Exchange (ETDEWEB)

    Coria, Jessica [University of Gothenburg, 41122 Gothenburg (Sweden); Universidad Diego Portales, Santiago (Chile)

    2009-11-15

    This study looks at the effects of the choice between taxes and permits on the pattern of adoption of a new (pollution) emissions abatement technology. It uses a dynamic setting, where the regulator observes the arrival and initial use of the technology and determines the optimal ex post amount of emissions before firms start to adopt the technology. In the model here, the adoption benefits and costs depend on the number of firms that are already using the technology. Thus, each firm decides the optimal date to adopt the technology, considering its benefits and costs, as well as the advantage they will gain over their rivals, producing a sequence of adoption that is ''diffused'' into the industry over time. With this framework, the study shows that when the output demand is elastic, auctioned permits induce an earlier diffusion than taxes. (author)

  4. Setting the global thermostat with an exhaustible tradeable permit system

    International Nuclear Information System (INIS)

    Kosobud, R.G.; Quinn, K.G.; Illinois Univ., Chicago, IL; South, D.W.; Daly, T.A.

    1993-01-01

    The global warming policy debate has centered largely on near-term objectives such as freezing 1990 CO 2 emissions without regard to long-run implications. A policy of freezing CO 2 emissions is shown to slow but not halt global warming, while requiring expensive near-term adjustments. If the long-run temperature change outcome of the freeze policy is set as the goal of a more graduated control policy, one which allows the market to determine annual emissions, a more cost-effective solution is obtained that reduces the negative adjustment effects on the energy and other affected industries. The most cost-effective emissions time path of a graduated control policy could be achieved by an evaporative marketable CO 2 emissions permit system. This paper provides a preliminary examination of an evaporative permit system used to achieve long-run stabilization of greenhouse-induced temperature change

  5. Geothermal : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R.Gordon

    1991-10-01

    The actual geothermal exploration and development may appear to be a simple and straightforward process in comparison to the legal and institutional maze which the developer must navigate in order to obtain all of the federal, state, and local leases, permits, licenses, and approvals necessary at each step in the process. Finally, and often most difficult, is obtaining a contract for the sale of thermal energy, brine, steam, or electricity. This guide is designed to help developers interested in developing geothermal resource sites in the Bonneville Power Administration Service Territory in the state of Idaho, Montana, Oregon, and Washington better understand the federal, state, and local institutional process, the roles and responsibilities of each agency, and how and when to make contact in order to obtain the necessary documents.

  6. Challenges to IPPC-B permitting at LGU in Macedonia

    International Nuclear Information System (INIS)

    Nikolov, Marjan

    2006-01-01

    The debate will soon turn to discussion of the arrangements between the environmental protection administration (both central and local), the LGU and ZELS and businesses in order to implement the Law on environment. Of special importance will be development of environment for IPPC-B permitting at the LGU including all stakeholders. The Ministry of Environment and Physical Planning-MEPP must clarify the interface between the responsibilities of the Environmental Protection Administration and those of the LGU.

  7. State Waste Discharge Permit application, 100-N Sewage Lagoon

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond.

  8. State Waste Discharge Permit application, 100-N Sewage Lagoon

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond

  9. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  10. State Waste Discharge Permit Application: Electric resistance tomography testing

    International Nuclear Information System (INIS)

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks

  11. Environmental permits in Arab Gulf countries - local government perspective

    International Nuclear Information System (INIS)

    Kuczynski, L.

    2002-01-01

    The legacy of past environmentally careless oil and gas exploration practices is becoming more apparent as time goes by and our understanding of causes and results increase. In many petroleum producing countries and in Arab Gulf countries in particular, this understanding has resulted in greater social demand for environmental protection and responsible exploitation of limited resources. In response to this demand, governments of the Gulf Region are paying increasingly more attention to the responsible management of environmental impacts of new developments. As a result, most of them require developers to obtain environmental permits supported by a variety of environmental baseline studies, Environmental Impact Assessments and comprehensive Environmental Management Plans. These local environmental requirements are similar to those in North America and Europe, although there are some important differences on account of local environmental, historical and socioeconomic conditions. Developers, who choose to ignore them, often find their projects caught in a web of unfamiliar environmental regulations or administrative procedures that may cause costly and unnecessary delays. Based on the author's Canadian and Arab Gulf regulatory experience, this paper describes some common causes that may delay obtaining environmental permits or cause cancellation of a project, and provides ideas to assist companies in securing necessary permits and licenses. (author)

  12. State Waste Discharge Permit Application: Electric resistance tomography testing

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

  13. 616 Nonradioactive Dangerous Waste Storage Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this storage unit, including the Part A included with this document, is provided at the beginning of the Part A Section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings. The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application (Revision 0) was submitted to the Washington State Department of Ecology and the US Environmental Protection Agency on July 31, 1989. Revision 1, addressing Washington State Department of Ecology review comments made on Revision 0 dated November 21, 1989, and March 23, 1990, was submitted on June 22, 1990. This submittal, Revision 2, addresses Washington State Department of Ecology review comments made on Revision 1, dated June 22, 1990, August 30, 1990, December 18, 1990, and July 8, 1991

  14. After the Hague, Bonn and Marrakech: uncertainties on the future international market of emission permits

    International Nuclear Information System (INIS)

    Kitous, A.; Criqui, P.; Blanchard, O.

    2002-01-01

    The purpose of this article is to present an economic assessment, step by step, of the successive developments of the negotiation on weather changes since the Kyoto protocol in 1997 until the agreement achieved in Marrakech during the seventh Conference of the Parties (COP 7) in November 2001. The analysis covers the international market of emission rights, a key mechanism of the Protocol, the purpose of which is to facilitate the Parties' compliance with their undertakings, by introducing flexibility to improve the economic efficiency of emission reduction. However, it now appears that despite the Marrakech agreement in November 2001, the system is weakened by the withdrawal of the USA decided by President G.W. Bush in March 2001, following COP 6 in The Hague, and by a potential excess of permits due to the economic recession of transition countries since the early nineties (hot air). As things stands, the establishment of the market between the countries taking part in the process will undoubtedly require some management of this hot air between transition countries (Eastern Europe and Ex USSR) and the other Parties of appendix B still involved in the process. The uncertainties weighing on the future market of emission permits strengthen the strategic significance of the implementation of effective reduction policies within those regions and particularly within Europe. (authors)

  15. Permit markets, market power, and the trade-off between efficiency and revenue raising

    Energy Technology Data Exchange (ETDEWEB)

    Antelo, Manel [Departamento de Fundamentos da Analise Economica, Universidade de Santiago de Compostela, Campus Norte, 15782 Santiago de Compostela (Spain); Bru, Lluis [Departament d' Economia de l' Empresa, Universitat de les Illes Balears, Campus Cra. de Valldemossa, km. 7, 07122 Palma de Mallorca (Spain)

    2009-11-15

    This paper focuses on an emissions permit market dominated by one firm and with a government concerned about social efficiency and permits revenue. In this setting, it is shown that the dominant firm's market power reduces the opportunities for the government to raise non-distortionary revenue from permits without loss of consumer surplus. Since the government's objectives are thus hampered in auctioning permits, the dominant firm should be excluded from the auction. Specifically, the regulator should sell permits directly, through bilateral negotiation, to the dominant firm, and auction off the remaining permits to the fringe firms. (author)

  16. Why do general medical patients have a lengthy wait in the emergency department before admission?

    Directory of Open Access Journals (Sweden)

    Nin-Chieh Hsu

    2014-08-01

    Conclusion: Complex comorbidities and terminal conditions with DNR consent were associated with the prolonged ED stay for general medical patients. The hospital manager should pay attention to general medical patients with multiple comorbidities as well as those who require palliative care.

  17. Closing the Door Behind You: How the United States Army Conducts Logistical Withdrawals after Lengthy Operations

    Science.gov (United States)

    2013-05-23

    AirLand Battle doctrine. It remains an active Field Manual. FM 100-9 details the steps to regenerate combat power after extensive attrition by enemy...peace talks in Paris . After a heavy bombing campaign against North Vietnam forced a resumption of negotiations, the United States agreed to a cease-fire...march to Baghdad, hindered mobility throughout urban areas and stability operations. CJTF-7 leaders saw that additional forces would be required to

  18. The analysis of anode sludges, and their process solutions and beneficiation products

    International Nuclear Information System (INIS)

    Dixon, K.; Russell, G.M.; Wall, G.J.; Eddy, B.T.; Mallett, R.C.; Royal, S.J.

    1979-01-01

    As previous methods for the analysis of anode slimes have required lengthy separations, instrumental procedures were developed that require no preparation of the sample or only simple procedures such as acid digestion and fusion. Comparative values for various techniques are given. Methods for the analysis of process solutions and beneficiation products are examined and the procedures that have been adopted together with their relative merits and applicability are discussed. Methods of analysis include: atomic-absorption spectrophotometry, x-ray-fluorescence spectrophotometry, x-ray-fluorescence spectrometry, instrumental neutron-activation analysis and optical emission spectrometry

  19. Induction Processed Separable Tubular Brazed Connectors

    National Research Council Canada - National Science Library

    Hunt, V

    1966-01-01

    .... The induction process was selected for brazing the separable tube connectors. Special plier-type induction brazing tools were made to permit the brazing of M-1 thrust chamber transition tube joints to the fuel torus. An 82% gold-18...

  20. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1998-01-01

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464

  1. 78 FR 20316 - Final Issuance of General NPDES Permits (GP) for Small Suction Dredges in Idaho

    Science.gov (United States)

    2013-04-04

    ... Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA exempts... permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or...

  2. 77 FR 55475 - Federal Acquisition Regulation; Information Collection; Permits, Authorities, or Franchises

    Science.gov (United States)

    2012-09-10

    ...; Information Collection; Permits, Authorities, or Franchises AGENCY: Department of Defense (DOD), General... approved information collection requirement concerning permits, authorities, or franchises for regulated..., Authorities, or Franchises, by any of the following methods: Regulations.gov : http://www.regulations.gov...

  3. 78 FR 54686 - Notice of Permit Applications Received under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-05

    ... University, College Station, Texas. Permit Application: 2014-012. Activity for Which Permit is Requested ASPA... Lower Taylor Glacier and Blood Falls; ASMA 2 McMurdo Dry Valleys; ASMA 7 Southwest Anvers Island and...

  4. 78 FR 60321 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-10-01

    ... University, College Station, Texas. Permit Application: 2014-021. Activity for Which Permit is Requested... 158 Hut Point; ASPA 172 Lower Taylor Glacier and Blood Falls; ASMA 2 McMurdo Dry Valleys; ASMA 7...

  5. 78 FR 56744 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-13

    ..., University of Tennessee, Knoxville, TN. Permit Application: 2014-014. Activity for Which Permit is Requested... the source of the brine. Location: ASPA 172 Lower Taylor Glacier and Blood Falls, McMurdo Dry Valleys...

  6. Tennessee Valley Authority, Paradise Fossil Plant; Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  7. Tennessee Valley Authority, Paradise Fossil Plant; Order Responding Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  8. Wisconsin Public Service, Weston Generating Station; Petition to Object to Issuance of Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  9. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Deffenbaugh, M.L.

    1998-05-28

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

  10. 78 FR 9687 - Prineville Energy Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-02-11

    ... Energy Regulatory Commission Prineville Energy Storage, LLC; Notice of Preliminary Permit Application..., 2012, Prineville Energy Storage, LLC, filed an application for a preliminary permit, pursuant to...-hours. Applicant Contact: Mr. Matthew Shapiro, Chief Executive Officer, Prineville Energy Storage, LLC...

  11. Tradewinds Veneer Mill, Ookala, Hawaii; Petition to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  12. Tradewinds Veneer Mill, Ookala, Hawaii; Petiton to Object to Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  13. USDA Forest Service, Rocky Mountain Region PSD Permit Completeness Determination

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. City of Richland 300 Area industrial wastewater permit application

    International Nuclear Information System (INIS)

    1995-05-01

    Battelle-Pacific Northwest Labs and Westinghouse Hanford Co. are responsible for operating most of the facilities within the 300 Area; other contractors are also involved. The document gives briefly water/wastewater data: water sources, water usage, water discharge/loss, NPDES permit status, plant sewer outlets size and flow, etc. The document also includes the following attachments: 300 Area building list, Oct. 1993-Oct. 1994 300 Area water balance, waste shipments for CY 1994, complete chemical listing, sanitary sewer sampling results (12/19/94, 1/18/95, 1/15/95), and priority pollutant listings

  15. Should Pro-Tec be Permitted as a Major Source

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  16. 21 CFR 1210.26 - Permits for raw milk or cream.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Permits for raw milk or cream. 1210.26 Section... FEDERAL IMPORT MILK ACT Permit Control § 1210.26 Permits for raw milk or cream. Except as provided in § 1210.27, permits to ship or transport raw milk or cream into the United States will be granted only...

  17. 78 FR 20035 - Adequacy of Oregon Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2013-04-03

    ... AGENCY 40 CFR Parts 239 and 258 Adequacy of Oregon Municipal Solid Waste Landfill Permit Program AGENCY... to the State of Oregon's approved Municipal Solid Waste Landfill (MSWLF) permit program. The approved... regulations allowing RD&D Permits to be issued to certain municipal solid waste landfills by approved states...

  18. 30 CFR 75.812 - Movement of high-voltage power centers and portable transformers; permit.

    Science.gov (United States)

    2010-07-01

    ... portable transformers; permit. 75.812 Section 75.812 Mineral Resources MINE SAFETY AND HEALTH... transformers; permit. [Statutory Provisions] Power centers and portable transformers shall be deenergized... than such centers or transformers is not available, the Secretary may permit such centers and...

  19. 77 FR 2311 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2012-01-17

    ... the species in the wild. Permit Application Number: TE212420. Applicant: John A. Vucetich, Michigan... at enhancement of survival of the species in the wild. Permit Application Number: TE60958A. Applicant... enhancement of survival of the species in the wild. Permit Application Number: TE43555A. Applicant: Maria...

  20. 77 FR 25717 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging

    Science.gov (United States)

    2012-05-01

    ... required by section 553 of the Administrative Procedure Act (APA), or any other law, to publish general... entities.'' EPA has concluded that NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or the RFA. Notwithstanding that general permits are...