  1. Spruce Lake Dam reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, G. [SGE Acres Ltd., Fredericton, NB (Canada); Barnard, J. [SGE Acres Ltd., St. John' s, NF (Canada); Vriezen, C. [City of Saint John, NF (Canada); Stephenson, M. [Jacques Whitford Environment Ltd., Fredericton, NB (Canada)

    2004-09-01

    Spruce Lake Dam was constructed in 1898 as part of the water supply system for Saint John, New Brunswick. The original dam was a 6 meter high, 140 meter long concrete gravity dam with an intake structure at its mid point and an overflow spillway at the left abutment. A rehabilitation project was launched in 2001 to bring the deteriorated dam into conformance with the dam safety guidelines of the Canadian Dam Association. The project criteria included minimal disruption to normal operation of water supply facilities and no negative effect on water quality. The project involved installation of a new low level outlet, removal of a gate house and water intake pipes, replacement of an access road culvert in the spillway channel, and raising the earth dam section by 1.8 meters to allow for increased water storage. The new raised section has an impervious core. The project also involved site and geotechnical investigations as well as hydrotechnical and environmental studies. This presentation described the final design of the remedial work and the environmental permitting procedures. Raising the operating level of the system proved successful as demonstrated by the fewer number of pumping days required after dam rehabilitation. The dam safety assessment under the Canadian Environmental Assessment Act began in April 2001, and the rehabilitation was completed by the end of 2002. 1 tab., 8 figs.

  2. Crotch Lake dam rehabilitation project

    International Nuclear Information System (INIS)

    Brunet, G.; Dobrowolski, E.

    1999-01-01

    Replacement of the existing wood crib dam structure on Crotch Lake on the Mississippi River in eastern Ontario that provided water storage for the power production at High Falls Generating Station, became necessary when it was determined that the dam did not meet Ontario-Hydro's safety standards. This paper describes the project of replacing the existing structure with a PVC coated gabion wall with waterproofing. The entire structure was covered with three layers of wire mesh, laced together, and criss-crossed for superior strength and rigidity. The work was completed in 28 days with no environmental impact . Life expectancy of the new structure is in excess of 40 years. With periodic maintenance of the gabion mat cover, life span could be extended an additional 20 to 40 years. 5 figs

  3. Seismic risks at Elsie Lake Main Dam

    International Nuclear Information System (INIS)

    McCammon, N.R.; Momenzadeh, M.; Hawson, H.H.; Nielsen, N.M.

    1991-01-01

    The Elsie Lake dams are located on Vancouver Island in an area of high seismic risk. A safety review in 1986 indicated potential deficiencies in the earthfill main dam with respect to modern earthquake design standards. A detailed field investigation program comprising drilling and penetration tests was carried out and the results used in an assessment of seismic stability. A 0.8 m thick less dense layer in the granular shell of the dam, possibly caused by wet construction conditions, would likely liquefy in a major earthquake but sufficient residual strength would likely remain to prevent catastrophic failure. The dam shell might undergo some distortion, and an assessment was initiated to determine the requirements for reservoir drawdown following an extreme earthquake to ensure the timely lowering of the reservoir for inspection and repair. It was suggested that an adequate evacuation capability would be 25% and 50% drawdown in not more than 30 and 50 days, respectively. 9 refs., 11 figs., 1 tab

  4. 33 CFR 162.220 - Hoover Dam, Lake Mead, and Lake Mohave (Colorado River), Ariz.-Nev.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Hoover Dam, Lake Mead, and Lake... REGULATIONS § 162.220 Hoover Dam, Lake Mead, and Lake Mohave (Colorado River), Ariz.-Nev. (a) Lake Mead and... the axis of Hoover Dam and that portion of Lake Mohave (Colorado River) extending 4,500 feet...

  5. 78 FR 77397 - Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas

    Science.gov (United States)

    2013-12-23

    ... Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas AGENCY: U.S. Army Corps... Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas. In 1997, the Lower Colorado River... regulations to reflect changes in ownership and responsibilities of flood control management of Marshall Ford...

  6. Phytoplankton composition of Sazlidere Dam lake, Istanbul, Turkey

    Directory of Open Access Journals (Sweden)

    Nese Yilmaz

    2013-05-01

    Full Text Available The phytoplankton composition of Sazlidere Dam lake was studied at 5 sampling sites between December 2003 - November 2005. A total of 67 taxa were recorded, representing Bacillariophyta (31, Chlorophyta (18, Cyanophyta (9, Chrysophyta (1, Cryptophyta (1, Dinophyta (3 and Euglenophyta (4. Bacillariophyta members constituted the dominant phytoplankton group in terms of species number. Nygaard’s compound index value and composition of phytoplankton indicate that the trophic state of Sazlidere Dam lake was changing from oligotrophic to mesotrophic.

  7. 33 CFR 208.19 - Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Marshall Ford Dam and Reservoir... Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex. The Secretary of the Interior, through his agent, the Lower Colorado River Authority (LCRA) shall operate the Marshall Ford Dam...

  8. Wynoochee Lake and dam flood storage reevaluation study

    International Nuclear Information System (INIS)

    Lynch, C.J.

    1993-01-01

    With the desire to increase the revenue generating potential of the Wynoochee Lake and Dam Project the cities of Tacoma and Aberdeen, Washington, have pursued the potential for retrofitting a hydropower plant at the dam. The feasibility of the hydropower plant is dependent on higher average head for power generation. This paper discusses the Corps of Engineers reevaluation of the winter flood control requirements with the aim of raising the elevation of the winter operating pool

  9. 33 CFR 208.34 - Norman Dam and Lake Thunderbird, Little River, Okla.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Norman Dam and Lake Thunderbird... OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.34 Norman Dam and Lake Thunderbird, Little River, Okla. The Bureau of Reclamation, or its designated agent, shall operate Norman Dam and Lake...

  10. 33 CFR 208.29 - Arbuckle Dam and Lake of the Arbuckles, Rock Creek, Okla.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Arbuckle Dam and Lake of the..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.29 Arbuckle Dam and Lake of the... Dam and Lake of the Arbuckles in the interest of flood control as follows: (a) Flood control storage...

  11. Cordova Lake dam hydroelectric generating station case study

    International Nuclear Information System (INIS)

    Kerr, D.; Huxley, J.

    1993-01-01

    The Ontario Ministry of Natural Resources released a Crown owned site to the private water power industry as part of the small hydro site release program initiated by the Ontario Government in the mid 1980's. The Cordova Lake Dam Hydroelectric Generating Station, built on this site, has been in operation since the first week of October, 1992. Since that time, the plant has been operating with less than 1 % down time and has generated over 2,400 MWh of electricity. Algonquin Power Systems is responsible for the management and operations of the plant which includes full time monitoring from the company's Mississauga office and a part time employee at Cordova Lake. Cordova Lake Dam is located on the Crowe River at the outlet of Cordova Lake, approximately 125 kilometers east of Toronto, Ontario. The total cost of the Cordova Lake Dam project was $1.6 million. Algonquin Power contributed 20% equity to the project. Algonquin Power was also responsible for all engineering and geotechnical work and for completing the construction and equipment contracts. 1 tab., 2 figs

  12. Satellite Monitoring of Pakistan's Rockslide-Dammed Lake Gojal

    Science.gov (United States)

    Kargel, Jeffrey S.; Leonard, Gregory; Crippen, Robert E.; Delaney, Keith B.; Evans, Stephen G.; Schneider, Jean

    2010-10-01

    On 4 January 2010, a rockslide 1200 meters long, 350 meters wide, and 125 meters high dammed the Hunza River in Attabad, northern Pakistan, and formed Lake Gojal. The initial mass movement of rock killed 20 people and submerged several villages and 22 kilometers of the strategic Karakoram Highway linking Pakistan and China. Tens of thousands of people were displaced or cut off from overland connection with the rest of the country. On 29 May, the lake overflow began to pour through a spillway excavated by Pakistani authorities. On approximately 20 July, the lake attained a maximum depth of 119 meters and a torrent at least 9 meters deep issued over the spillway, according to Pakistan's National Disaster Management Authority (NDMA). To date, the natural dam is holding and eroding slowly. However, the threat of a catastrophic outburst flood remains.

  13. 33 CFR 208.32 - Sanford Dam and Lake Meredith, Canadian River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Sanford Dam and Lake Meredith... OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.32 Sanford Dam and Lake Meredith, Canadian River, Tex. The Bureau of Reclamation, or its designated agent, shall operate the Sanford Dam and...

  14. Drainage of the ice-dammed Lake Tinninilik, West Greenland; implication on bedrock uplift

    DEFF Research Database (Denmark)

    Kjeldsen, Kristian Kjellerup; Khan, Shfaqat Abbas; Bjørk, Anders Anker

    Drainage of ice-dammed lakes is regularly observed along the margin of the Greenland Ice Sheet. However, the speed of the drainage events and implications can vary depending on the size of the lakes and the local settings. Here, we assess the drainage pattern of Lake Tinninilik, dammed...

  15. 75 FR 26094 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago...

    Science.gov (United States)

    2010-05-11

    ...-AA00 Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago... establishing a temporary safety zone from Brandon Road Lock and Dam to Lake Michigan. This temporary safety...

  16. 78 FR 17099 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago...

    Science.gov (United States)

    2013-03-20

    ...-AA00 Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago... the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago... Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including...

  17. 78 FR 49684 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2013-08-15

    ...-AA00 Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago... the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago... the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago...

  18. 76 FR 78161 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2011-12-16

    ... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... INFORMATION: The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake...

  19. 77 FR 20295 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago...

    Science.gov (United States)

    2012-04-04

    ... Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines...

  20. 78 FR 65874 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2013-11-04

    ...-AA00 Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago... the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago... Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including...

  1. 75 FR 73966 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2010-11-30

    ... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines...

  2. 78 FR 4071 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2013-01-18

    ...-AA00 Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago... the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago... Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan...

  3. 78 FR 36091 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2013-06-17

    ... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago...

  4. 77 FR 35854 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2012-06-15

    ... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines...

  5. 75 FR 64673 - Safety Zone, Brandon Road Lock and, Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2010-10-20

    ... Zone, Brandon Road Lock and, Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and... Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Ship and...: The Coast Guard will enforce Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des...

  6. 78 FR 40635 - Safety Zone; Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2013-07-08

    ... Zone; Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan...

  7. 78 FR 36092 - Safety Zone; Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2013-06-17

    ... Zone; Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan...

  8. 77 FR 65478 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago...

    Science.gov (United States)

    2012-10-29

    ...-AA00 Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago... the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago... segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River...

  9. 76 FR 63199 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2011-10-12

    ... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal...

  10. 76 FR 2829 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2011-01-18

    ... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines...

  11. 75 FR 64147 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2010-10-19

    ... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Ship and Sanitary Canal... . SUPPLEMENTARY INFORMATION: The Coast Guard will enforce Safety Zone, Brandon Road Lock and Dam to Lake Michigan...

  12. 75 FR 52462 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2010-08-26

    ... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines...

  13. 77 FR 60044 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2012-10-02

    ...-AA00 Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago... the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago... segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River...

  14. 76 FR 65609 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2011-10-24

    ... Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal... Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago... INFORMATION: The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake...

  15. Efficiency testing of Red Lake protection dam on Rosu stream by 210Pb method

    International Nuclear Information System (INIS)

    Robert-Csaba Begy; Hedvig Simon; Edina Reizer

    2015-01-01

    The Red lake, a small lake from Romania is threatened by massive sedimentation, therefore two protection dams were constructed on Oii and Rosu brooks. The aim of this study is to get information about the variation of the retention capability of the dams using the 210 Pb method. 210 Pb, 226 Ra and 137 Cs were measured by gamma- and 210 Po by alpha spectrometry. The values for mass sedimentation are between 0.17 ± 0.03-2.3 ± 0.4 g/cm 2 y for the Red Lake and 0.21 ± 0.03-0.9 ± 0.1 g/cm 2 y for the dam lake. Due to these high values, the dam lake will fill up in 20 ± 8y and 80 % of the Red Lake in 81 ± 30y. (author)

  16. National Dam Safety Program. Clove Lake Dam (NJ 00259) Delaware River Basin, Shimers Brook, Sussex County, New Jersey. Phase I Inspection Report.

    Science.gov (United States)

    1981-08-01

    it be reclassified as low hazard. The spillway will pass the 100-year flood and is considered adequate. e. Ownership. The dam is owned by Clubhouse ...Associates. For information, contact Mr. Gerald Roby, Clubhouse Associates, RD 4, Box 108, Montague, New Jersey 07827. f. Purpose. The Clove Lake Dam...into what appears to be a man-made lake downstream of Clove Lake Dam about 0.5 mile. Although no homes are presently constructed around this downstream

  17. National Dam Safety Program. Junior Lake Dam, (MO 11526) Missouri - Kansas City Basin, Callaway County, Missouri. Phase I Inspection Report.

    Science.gov (United States)

    1980-10-01

    Lake, Dam Inspection, Private Dams 20 AWTACT (Ce ffm ew - m*1et N naeey ad identfy by block number) This report was prepared under the National Program...cO r " 7 - IM-.r Il: r’ o .rrr4 QM zc PLT DL1 ~OC.4..NW to~.. c pz acca ~ ~ ~ 0 AaO cr~c 0000000000 ca~cc 0 NOCC~C ~ j...a ~ in =o ,0 0 00 O 0~ co

  18. Review Article: Lake and breach hazard assessment for moraine-dammed lakes: an example from the Cordillera Blanca (Peru

    Directory of Open Access Journals (Sweden)

    A. Emmer

    2013-06-01

    Full Text Available Glacial lake outburst floods (GLOFs and related debris flows represent a significant threat in high mountainous areas across the globe. It is necessary to quantify this threat so as to mitigate their catastrophic effects. Complete GLOF hazard assessment incorporates two phases: the probability of water release from a given glacial lake is estimated through lake and breach hazard assessment while the endangered areas are identified during downstream hazard assessment. This paper outlines a number of methods of lake and breach hazard assessment, which can be grouped into three categories: qualitative, of which we outline eight; semi-quantitative, of which we outline two; and quantitative, of which we outline three. It is considered that five groups of critical parameters are essential for an accurate regionally focused hazard assessment method for moraine-dammed lakes in the Cordillera Blanca. These comprise the possibility of dynamic slope movements into the lake, the possibility of a flood wave from a lake situated upstream, the possibility of dam rupture following a large earthquake, the size of the dam freeboard (or ratio of dam freeboard, and a distinction between natural dams and those with remedial work. It is shown that none of the summarised methods uses all these criteria with, at most, three of the five considered by the outlined methods. A number of these methods were used on six selected moraine-dammed lakes in the Cordillera Blanca: lakes Quitacocha, Checquiacocha, Palcacocha, Llaca, Rajucolta, and Tararhua. The results have been compared and show that each method has certain advantages and disadvantages when used in this region. These methods demonstrate that the most hazardous lake is Lake Palcacocha.

  19. Flood and rockslide mitigative measures for the concrete sections of the Daisy Lake Dam

    International Nuclear Information System (INIS)

    Pataky, T.J.

    1991-01-01

    Studies conducted under British Columbia Hydro's dam safety program during the early 1980s indicated that dam sections of the Daisy Lake Dam would be overtopped by the probable maximum flood (PMF) and by a postulated slide generated wave (SGW). It was considered that the overtopping by either of the events could cause several sections of the concrete dam to fall, thereby resulting in uncontrolled release of the reservoir. The criteria used for determining foundation strength parameters, static and SGW induced water pressures, effective uplift and the appropriate factors of safety are discussed. The results of the analyses for the original dam sections and the design and implementation of the selected remedial measures are also described. These measures included lowering the Wing Dam and Saddle Dam by about 2 m to increase the spillway capacity and the installation of 43 post-tensioned anchors in the various sections of the main concrete and Wing dams. 9 refs., 8 figs., 3 tabs

  20. 76 FR 23524 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2011-04-27

    ...-AA00 Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago... safety zone from Brandon Road Lock and Dam to Lake Michigan. This proposed safety zone will cover 77.... This TIR established a 77 mile long safety zone from Brandon Road Lock to Lake Michigan in Chicago, IL...

  1. 78 FR 49735 - Intent To Prepare a Draft Environmental Impact Statement for Dam Safety Study, Lake Lewisville...

    Science.gov (United States)

    2013-08-15

    ... determine appropriate permanent methods for correcting potential problems, interim risk reduction measures... Environmental Impact Statement for Dam Safety Study, Lake Lewisville Dam, Elm Fork Trinity River, Denton County... primary purposes of the project are flood risk management, [[Page 49736

  2. National Dam Safety Program. Potake Lake Dam (Inventory Number N.Y. 970), Passaic River Basin, Lower Hudson River Area, Rockland County, New York. Phase I Inspection Report,

    Science.gov (United States)

    1981-08-14

    facilitate thedischarge of storm flows. 2. The animal burrows, depressions , and tire ruts onthe crest of the dam should be filled, compacted and seeded. 3...storm flows. 2. The animal burrows, depressions , and tire ruts on the crest of the dam should be filled, compacted, and seeded...defined by the Recommended Guidelines for Safety Inspection of Dams (Reference 13, Appendix D). d. Hazard Classifications - Cranberry Lake Dam is one mile

  3. Design and Construction of Dams, Reservoirs, and Balancing Lakes

    International Nuclear Information System (INIS)

    Lemperiere, F.

    2003-01-01

    The general data presented in sections two and three gives an idea of the extreme diversity of the millions of very large or very small dams worldwide. Dam design and construction methods for the most usual types of large dams are presented and justified in section four. The possibility and usefulness of building as many dams in the 21. century as have been built in the 20. is analyzed in section six. (author)

  4. Natural and artificial radioactivity assessment of dam lakes sediments in Coruh River, Turkey

    International Nuclear Information System (INIS)

    Yasar Kobya; Sabit Korcak; Cafer Mert Yesilkanat

    2015-01-01

    In the sediment samples collected from 3 different dam reservoirs and 10 different stations on Coruh River, U-238, Th-232, K-40 and Cs-137 activity concentration levels were measured using high-resolution gamma-ray spectrometry. The mean concentrations of U-238, Th-232, K-40 and Cs-137 were found to be 15.8, 13.9, 551.5 and 18.1 Bq/kg in Deriner Dam Lake, 3.7, 12.5, 473.8 and 6.8 Bq/kg in Borcka Dam Lake, 14.4, 30.0, 491.7 and 18.2 Bq/kg in Muratli Dam Lake, respectively. Estimation calculations were made for the non-sampling zones by using Kriging method. Furthermore, results were compared with the similar studies done in different countries. (author)

  5. Technical background information for the environmental and safety report, Volume 4: White Oak Lake and Dam

    International Nuclear Information System (INIS)

    Oakes, T.W.; Kelly, B.A.; Ohnesorge, W.F.; Eldridge, J.S.; Bird, J.C.; Shank, K.E.; Tsakeres, F.S.

    1982-03-01

    This report has been prepared to provide background information on White Oak Lake for the Oak Ridge National Laboratory Environmental and Safety Report. The paper presents the history of White Oak Dam and Lake and describes the hydrological conditions of the White Oak Creek watershed. Past and present sediment and water data are included; pathway analyses are described in detail

  6. Technical background information for the environmental and safety report, Volume 4: White Oak Lake and Dam

    Energy Technology Data Exchange (ETDEWEB)

    Oakes, T.W.; Kelly, B.A.; Ohnesorge, W.F.; Eldridge, J.S.; Bird, J.C.; Shank, K.E.; Tsakeres, F.S.

    1982-03-01

    This report has been prepared to provide background information on White Oak Lake for the Oak Ridge National Laboratory Environmental and Safety Report. The paper presents the history of White Oak Dam and Lake and describes the hydrological conditions of the White Oak Creek watershed. Past and present sediment and water data are included; pathway analyses are described in detail.

  7. Drainage of ice-dammed lakes and glacier retreat - a link

    DEFF Research Database (Denmark)

    Kjeldsen, Kristian Kjellerup; Kjaer, K. H.; Rysgaard, Søren

    2011-01-01

    surface freshwater run-off is found in the top of the water column in the fjord while sub-glacial meltwater is entrained deeper in the water column. The latter is highly important as this colder buoyant freshwater is pushed to the water surface followed by a compensating deeper landward current bringing...... in the fjord. The large quantity of buoyant freshwater changed the osmotic pressure and pushed redfish to the water surface causing them to die from divers disease. Further investigation suggested that three ice-dammed lakes adjacent to the Narssap Sermia glacier had drained within the previous year. Analysis......-30 times the volume of an ice-dammed lake prior to drainage. The warm water influx in turn causes the glacier to retreat and to gradually become thinner which feeds back to an increase in drainage events of ice-dammed lakes over time. On a larger scale the feedback mechanism between the drainage of lakes...

  8. Ice-Dammed Lake Drainage Evolution at Russell Glacier, West Greenland

    Directory of Open Access Journals (Sweden)

    Jonathan L. Carrivick

    2017-11-01

    Full Text Available KEY POINTS/HIGHLIGHTSTwo rapid ice-dammed lake drainage events gauged and ice dam geometry measured.A melt enlargement model is developed to examine the evolution of drainage mechanism(s.Lake temperature dominated conduit melt enlargement and we hypothesize a flotation trigger.Glaciological and hydraulic factors that control the timing and mechanisms of glacier lake outburst floods (GLOFs remain poorly understood. This study used measurements of lake level at 15 min intervals and known lake bathymetry to calculate lake outflow during two GLOF events from the northern margin of Russell Glacier, west Greenland. We used measured ice surface elevation, interpolated subglacial topography and likely conduit geometry to inform a melt enlargement model of the outburst evolution. The model was tuned to best-fit the hydrograph rising limb and timing of peak discharge in both events; it achieved Mean Absolute Errors of <5%. About one third of the way through the rising limb, conduit melt enlargement became the dominant drainage mechanism. Lake water temperature, which strongly governed the enlargement rate, preconditioned the high peak discharge and short duration of these floods. We hypothesize that both GLOFs were triggered by ice dam flotation, and localized hydraulic jacking sustained most of their early-stage outflow, explaining the particularly rapid water egress in comparison to that recorded at other ice-marginal lakes. As ice overburden pressure relative to lake water hydraulic head diminished, flow became confined to a subglacial conduit. This study has emphasized the inter-play between ice dam thickness and lake level, drainage timing, lake water temperature and consequently rising stage lake outflow and flood evolution.

  9. An integrated approach to dam safety evaluation. A case study: Upper Lake Falls Dam, Nova Scotia, Canada

    International Nuclear Information System (INIS)

    Pelletier, P.M.; Rattue, D.A.; Brown, E.R.

    1990-01-01

    Upper Lake Falls Dam is located in southwestern Nova Scotia. It is the uppermost hydroelectric development in a series of six developments on the Mersey River. The total capacity of the Mersey River system is 42 MW. The reservoir of Upper Lake Falls, Lake Rossignol, is the largest in Nova Scotia with a total area of 66 square miles and a gross storage of 800,000 acre-feet. An overview is presented of the hydrologic and hydraulic investigations carried out for the dam, which is classified as having high hazard potential because of permanent village and urban developments located downstream. The general methodology adopted in the study consisted of the following: gathering and verifying all meteorologic and hydrologic data; evaluating the Probable Maximum Precipitation (PMP) assumed to occur over the basin, and of the antecedent conditions prior to the PMP; calibrating a watershed model on flood events generated by rainfall, and by a combination of snowmelt and rainfall, and verifying the model using additional hydrologic events; deriving the Probable Maximum Flood (PMF) using the PMP results simulated on the calibrated watershed model; hydrodynamic routing of the flood hydrograph through all the developments; dambreak analysis, following sequential or independent failures; and flood inundation mapping. Details are given of safety analysis of the earthfill and concrete dam structures, reservoir management and cost-benefit analyses. 7 refs., 8 figs., 1 tab

  10. Hydrograph Predictions of Glacial Lake Outburst Floods From an Ice-Dammed Lake

    Science.gov (United States)

    McCoy, S. W.; Jacquet, J.; McGrath, D.; Koschitzki, R.; Okuinghttons, J.

    2017-12-01

    Understanding the time evolution of glacial lake outburst floods (GLOFs), and ultimately predicting peak discharge, is crucial to mitigating the impacts of GLOFs on downstream communities and understanding concomitant surface change. The dearth of in situ measurements taken during GLOFs has left many GLOF models currently in use untested. Here we present a dataset of 13 GLOFs from Lago Cachet Dos, Aysen Region, Chile in which we detail measurements of key environmental variables (total volume drained, lake temperature, and lake inflow rate) and high temporal resolution discharge measurements at the source lake, in addition to well-constrained ice thickness and bedrock topography. Using this dataset we test two common empirical equations as well as the physically-based model of Spring-Hutter-Clarke. We find that the commonly used empirical relationships based solely on a dataset of lake volume drained fail to predict the large variability in observed peak discharges from Lago Cachet Dos. This disagreement is likely because these equations do not consider additional environmental variables that we show also control peak discharge, primarily, lake water temperature and the rate of meltwater inflow to the source lake. We find that the Spring-Hutter-Clarke model can accurately simulate the exponentially rising hydrographs that are characteristic of ice-dammed GLOFs, as well as the order of magnitude variation in peak discharge between events if the hydraulic roughness parameter is allowed to be a free fitting parameter. However, the Spring-Hutter-Clarke model over predicts peak discharge in all cases by 10 to 35%. The systematic over prediction of peak discharge by the model is related to its abrupt flood termination that misses the observed steep falling limb of the flood hydrograph. Although satisfactory model fits are produced, the range in hydraulic roughness required to obtain these fits across all events was large, which suggests that current models do not

  11. Stormwater Volume Control to Prevent Increases in Lake Flooding and Dam Failure Risk

    Science.gov (United States)

    Potter, K. W.

    2017-12-01

    Urban expansion is not often considered a major factor contributing to dam failure. But if urbanization occurs without mitigation of the hydrologic impacts, the risk of dam failure will increase. Of particular concern are increases in the volume of storm runoff resulting from increases in the extent of impervious surfaces. Storm runoff volumes are not regulated for much the U.S, and where they are, the required control is commonly less than 100%. Unmitigated increases in runoff volume due to urbanization can pose a risk to dams. A recent technical advisory committee of Dane County has recommended that the county require 100% control of stormwater volumes for new developments. The primary motivation was to prevent increases in the water levels in the Yahara Lakes, slowly draining lakes that are highly sensitive to runoff volume. The recommendations included the use of "volume trading" to achieve efficient compliance. Such recommendations should be considered for other slowly draining lakes, including those created by artificial structures.

  12. Ice-dammed lake drainage evolution at Russell Glacier, west Greenland

    Science.gov (United States)

    Carrivick, Jonathan L.; Tweed, Fiona S.; Ng, Felix; Quincey, Duncan J.; Mallalieu, Joseph; Ingeman-Nielsen, Thomas; Mikkelsen, Andreas B.; Palmer, Steven J.; Yde, Jacob C.; Homer, Rachel; Russell, Andrew J.; Hubbard, Alun

    2017-11-01

    Glaciological and hydraulic factors that control the timing and mechanisms of glacier lake outburst floods (GLOFs) remain poorly understood. This study used measurements of lake level at fifteen minute intervals and known lake bathymetry to calculate lake outflow during two GLOF events from the northern margin of Russell Glacier, west Greenland. We used measured ice surface elevation, interpolated subglacial topography and likely conduit geometry to inform a melt enlargement model of the outburst evolution. The model was tuned to best-fit the hydrograph’s rising limb and timing of peak discharge in both events; it achieved Mean Absolute Errors of Lake water temperature, which strongly governed the enlargement rate, preconditioned the high peak discharge and short duration of these floods. We hypothesize that both GLOFs were triggered by ice dam flotation, and localised hydraulic jacking sustained most of their early-stage outflow, explaining the particularly rapid water egress in comparison to that recorded at other ice-marginal lakes. As ice overburden pressure relative to lake water hydraulic head diminished, flow became confined to a subglacial conduit. This study has emphasised the inter-play between ice dam thickness and lake level, drainage timing, lake water temperature and consequently rising stage lake outflow and flood evolution.

  13. 76 FR 35106 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2011-06-16

    ...-AA00 Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago..., DHS. ACTION: Final rule. SUMMARY: The Coast Guard is establishing a permanent safety zone from Brandon... Safety Zones; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary...

  14. 77 FR 25595 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Science.gov (United States)

    2012-05-01

    ... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... Safety Zone; Brandon Road Lock and [[Page 25596

  15. Integrated Application of Remote Sensing, GIS and Hydrological Modeling to Estimate the Potential Impact Area of Earthquake-Induced Dammed Lakes

    OpenAIRE

    Bo Cao; Shengmei Yang; Song Ye

    2017-01-01

    Dammed lakes are an important secondary hazard caused by earthquakes. They can induce further damage to nearby humans. Current hydrology calculation research on dammed lakes usually lacks spatial expressive ability and cannot accurately conduct impact assessment without the support of remote sensing, which obtains important characteristic information of dammed lakes. The current study aims to address the issues of the potential impact area estimate of earthquake-induced dammed lakes by combin...

  16. Dams

    Data.gov (United States)

    Vermont Center for Geographic Information — This dataset �is generated from from the Vermont Dam Inventory (VDI). The VDI is managed by the VT DEC's Dam Safety and Hydrology Section and contains information...

  17. Distribution of 137Cs and 226Ra in the sediments of Aswan High Dam lake

    International Nuclear Information System (INIS)

    Ismail, S.S.; Unfried, E.; Grass, F.

    1994-01-01

    Sediment samples of the High Dam lake were investigated for their 137 Cs, 226 Ra, 228 Th, and 40 K content, using low-level γ-spectroscopy. The results show that at the beginning of the lake (500 km from the High Dam), where sediments consist mostly of sand, the level of 137 Cs is very low (0.1 Bq*kg -1 ). The maximum value (22.3 Bq*kg -1 ) was found 40 km from the wall of the High Dam, where the composition of the sediments is nearly 50% clays. The distribution of the natural nuclides 226 Ra, 228 Th and 40 K shows a different trend. (author) 9 refs.; 9 figs.; 1 tab

  18. Fault-dominated deformation in an ice dam during annual filling and drainage of a marginal lake

    Science.gov (United States)

    Walder, J.S.; Trabant, D.C.; Cunico, M.; Anderson, S.P.; Anderson, R. Scott; Fountain, A.G.; Malm, A.

    2005-01-01

    Ice-dammed Hidden Creek Lake, Alaska, USA, outbursts annually in about 2-3 days. As the lake fills, a wedge of water penetrates beneath the glacier, and the surface of this 'ice dam' rises; the surface then falls as the lake drains. Detailed optical surveying of the glacier near the lake allows characterization of ice-dam deformation. Surface uplift rate is close to the rate of lake-level rise within about 400 m of the lake, then decreases by 90% over about 100 m. Such a steep gradient in uplift rate cannot be explained in terms of ice-dam flexure. Moreover, survey targets spanning the zone of steep uplift gradient move relative to one another in a nearly reversible fashion as the lake fills and drains. Evidently, the zone of steep uplift gradient is a fault zone, with the faults penetrating the entire thickness of the ice dam. Fault motion is in a reverse sense as the lake fills, but in a normal sense as the lake drains. As the overall fault pattern is the same from year to year, even though ice is lost by calving, the faults must be regularly regenerated, probably by linkage of surface and bottom crevasses as ice is advected toward the lake basin.

  19. Periodic outburst floods from an ice-dammed lake in East Greenland.

    Science.gov (United States)

    Grinsted, Aslak; Hvidberg, Christine S; Campos, Néstor; Dahl-Jensen, Dorthe

    2017-08-30

    We report evidence of four cycles of outburst floods from Catalina Lake, an ice-dammed lake in East Greenland, identified in satellite imagery between 1966-2016. The lake measures 20-25 km 2 , and lake level drops 130-150 m in each event, corresponding to a water volume of 2.6-3.4 Gt, and a release of potential energy of 10 16  J, among the largest outburst floods reported in historical times. The drainage cycle has shortened systematically, and the lake filling rate has increased over each cycle, suggesting that the drainage pattern is changing due to climate warming with possible implications for environmental conditions in Scoresbysund fjord.

  20. Lake Robertson hydroelectric project. Construction of a roller compacted concrete dam

    Energy Technology Data Exchange (ETDEWEB)

    Labelle, M.; Robitaille, F. [Hydro-Quebec, Montreal, PQ (Canada)

    1995-12-31

    Construction of the Lake Robertson hydroelectric project on Quebec`s Lower North Shore was discussed in detail. The dam and powerhouse, located on the HaHa River, consists of a 134 m long concrete gravity dam, and a 21 MW powerhouse with two 69 kV transmission lines and four substations. The climate, terrain, and geography of the region, all of them characterized as severe, and the logistics of construction of the dam and power lines, aggravated by the isolation and severe conditions at the site, were described. The roller compacted concrete design and construction were noted, and justification for a concrete dam over an earth-fill dam was provided. Economics, properties, and composition of the roller compacted concrete (RCC) were examined, and control test results for the RCC concrete were provided. The use of RCC for the Lake Robertson development was described as successful in terms of the quality, watertightness, and completion time. The experience gained by the participants will make it possible to offer RCC as an alternative on various other projects. 2 figs.

  1. Climate change and the global pattern of moraine-dammed glacial lake outburst floods

    Directory of Open Access Journals (Sweden)

    S. Harrison

    2018-04-01

    Full Text Available Despite recent research identifying a clear anthropogenic impact on glacier recession, the effect of recent climate change on glacier-related hazards is at present unclear. Here we present the first global spatio-temporal assessment of glacial lake outburst floods (GLOFs focusing explicitly on lake drainage following moraine dam failure. These floods occur as mountain glaciers recede and downwaste. GLOFs can have an enormous impact on downstream communities and infrastructure. Our assessment of GLOFs associated with the rapid drainage of moraine-dammed lakes provides insights into the historical trends of GLOFs and their distributions under current and future global climate change. We observe a clear global increase in GLOF frequency and their regularity around 1930, which likely represents a lagged response to post-Little Ice Age warming. Notably, we also show that GLOF frequency and regularity – rather unexpectedly – have declined in recent decades even during a time of rapid glacier recession. Although previous studies have suggested that GLOFs will increase in response to climate warming and glacier recession, our global results demonstrate that this has not yet clearly happened. From an assessment of the timing of climate forcing, lag times in glacier recession, lake formation and moraine-dam failure, we predict increased GLOF frequencies during the next decades and into the 22nd century.

  2. Climate change and the global pattern of moraine-dammed glacial lake outburst floods

    Science.gov (United States)

    Harrison, Stephan; Kargel, Jeffrey S.; Huggel, Christian; Reynolds, John; Shugar, Dan H.; Betts, Richard A.; Emmer, Adam; Glasser, Neil; Haritashya, Umesh K.; Klimeš, Jan; Reinhardt, Liam; Schaub, Yvonne; Wiltshire, Andy; Regmi, Dhananjay; Vilímek, Vít

    2018-04-01

    Despite recent research identifying a clear anthropogenic impact on glacier recession, the effect of recent climate change on glacier-related hazards is at present unclear. Here we present the first global spatio-temporal assessment of glacial lake outburst floods (GLOFs) focusing explicitly on lake drainage following moraine dam failure. These floods occur as mountain glaciers recede and downwaste. GLOFs can have an enormous impact on downstream communities and infrastructure. Our assessment of GLOFs associated with the rapid drainage of moraine-dammed lakes provides insights into the historical trends of GLOFs and their distributions under current and future global climate change. We observe a clear global increase in GLOF frequency and their regularity around 1930, which likely represents a lagged response to post-Little Ice Age warming. Notably, we also show that GLOF frequency and regularity - rather unexpectedly - have declined in recent decades even during a time of rapid glacier recession. Although previous studies have suggested that GLOFs will increase in response to climate warming and glacier recession, our global results demonstrate that this has not yet clearly happened. From an assessment of the timing of climate forcing, lag times in glacier recession, lake formation and moraine-dam failure, we predict increased GLOF frequencies during the next decades and into the 22nd century.

  3. The impact of foundation conditions on the design and construction of the Snake Lake Reservoir dams

    International Nuclear Information System (INIS)

    Griffin, G. D.

    1998-01-01

    Unique aspects of the design and construction of two small dams for the Snake Lake Reservoir Project and some of the lessons learned in the process are described. The outstanding feature of this project was that although relatively close together and in the same post-glacial channel, the foundations of the two dams were quite different. The West Dam had permeable silt, sand and gravel with deep bedrock, while the East Dam had impermeable high plastic clay and shallow bedrock as foundation. The challenge to the design was to develop a cross section that would work for both foundation conditions. The final design turned out to be an impermeable fill with toe berms accommodating the variability in the foundations. Instrumentation was used to determine when the second construction stage should commence. At the end of the construction, the reservoir was partially filled relying on the instrumentation to suggest when that would be safe enough to proceed without impacting the overall embankment stability. In the event, the West Dam foundation soils proved to be several orders of magnitude higher than estimated from grain size analyses, requiring installation of a relief valve after construction was completed. Apart from that, dam construction proceeded smoothly and the instrumentation performed as expected.12 refs., 7 figs

  4. Levels and distribution of organohalogenated contaminants in 5 fish species from Sir Dam Lake, Kahramanmaras, Turkey

    Energy Technology Data Exchange (ETDEWEB)

    Erdogrul, Oe [Faculty of Agriculture, Kahramanmaras (Turkey). Dept. of Food Engineering; Covaci, A; Schepens, P [Antwerp Univ. (Belgium). Toxicological Center

    2004-09-15

    In Turkey, OCPs have been used since 1945, with large quantities of these chemicals being used during the 1960s and 1970s. Since 1983, the usage of OCPs has been severely restricted or banned. Only few studies have investigated the presence of OCPs in Turkish aquatic environment, where they have been evidenced in relatively high concentrations. The aim of this study was to investigate the levels and distribution of organohalogenated contaminants in several fish species from Syr Dam Lake (Kahramanmarab, Turkey), an artificial lake with great economical importance for the region.

  5. Chronology and alteration of cyclic drainage events for ice-dammed Lake Tiningnilik, Greenland, in 2010

    DEFF Research Database (Denmark)

    Haase, Eric Juergen; Furuya, Masato; Korsgaard, Niels Jákup

    pattern in nature lasting through the 19th and 20th centuries until now. In summer 2010 the lake drained after just 7 years and at a lower water stand than the 2003 pre-drainage levels. This represents an adjustment to new equilibrium conditions with the ice dam and might be an index of recent local...... climate change in Greenland. We take a close look at Lake Tiningnilik and previous studies to constrain the timing of the drainage events using historical air photos and satellite imagery starting in the 1940s and 1970s, respectively. Tiningnilik has been occasionally surveyed on the ground since the 1980...

  6. Trace elements in sediment samples of the Aswan High Dam Lake

    International Nuclear Information System (INIS)

    Sherief, M.K.; Awadallah, R.M.; Grass, F.

    1981-01-01

    Main and trace elements in Nile sediments of the Aswan High Dam Lake were investigated by means of Instrumental Activation Analysis. It was shown that the composition of the Nile sediments changes in accordance with the large gradients in flow rate and with elution and absorption processes. Particles containing Ca, Ba, Hf, Ti, V, and Na are sedimented preferentially near the headwater of Lake Nubia, whereas some elements are rather uniformly distributed, e.g. Fe, Co, Sm, and Eu, and some, such as Al, Sc, Cs, Th, La, and Ce, show a distinct increase downstream. Some elements do not fit into any of these three groups. (author)

  7. Geomorphologically effective floods from moraine-dammed lakes in the Cordillera Blanca, Peru

    Czech Academy of Sciences Publication Activity Database

    Emmer, Adam

    2017-01-01

    Roč. 177, DEC (2017), s. 220-234 ISSN 0277-3791 R&D Projects: GA MŠk(CZ) LO1415 Institutional support: RVO:86652079 Keywords : Andes * Documentary data * Geomorphology * glof * Lichenometry * Little Ice Age * Moraine-dammed lake * Outburst flood * South America Subject RIV: EH - Ecology, Behaviour OBOR OECD: Environmental sciences (social aspects to be 5.7) Impact factor: 4.797, year: 2016

  8. Enhanced ice sheet growth in Eurasia owing to adjacent ice-dammed lakes.

    Science.gov (United States)

    Krinner, G; Mangerud, J; Jakobsson, M; Crucifix, M; Ritz, C; Svendsen, J I

    2004-01-29

    Large proglacial lakes cool regional summer climate because of their large heat capacity, and have been shown to modify precipitation through mesoscale atmospheric feedbacks, as in the case of Lake Agassiz. Several large ice-dammed lakes, with a combined area twice that of the Caspian Sea, were formed in northern Eurasia about 90,000 years ago, during the last glacial period when an ice sheet centred over the Barents and Kara seas blocked the large northbound Russian rivers. Here we present high-resolution simulations with an atmospheric general circulation model that explicitly simulates the surface mass balance of the ice sheet. We show that the main influence of the Eurasian proglacial lakes was a significant reduction of ice sheet melting at the southern margin of the Barents-Kara ice sheet through strong regional summer cooling over large parts of Russia. In our simulations, the summer melt reduction clearly outweighs lake-induced decreases in moisture and hence snowfall, such as has been reported earlier for Lake Agassiz. We conclude that the summer cooling mechanism from proglacial lakes accelerated ice sheet growth and delayed ice sheet decay in Eurasia and probably also in North America.

  9. Assessing the potential hydrological impact of the Gibe III Dam on Lake Turkana water level using multi-source satellite data

    Science.gov (United States)

    Velpuri, N. M.; Senay, G. B.

    2012-10-01

    Lake Turkana, the largest desert lake in the world, is fed by ungauged or poorly gauged river systems. To meet the demand of electricity in the East African region, Ethiopia is currently building the Gibe III hydroelectric dam on the Omo River, which supplies more than 80% of the inflows to Lake Turkana. On completion, the Gibe III dam will be the tallest dam in Africa with a height of 241 m. However, the nature of interactions and potential impacts of regulated inflows to Lake Turkana are not well understood due to its remote location and unavailability of reliable in situ datasets. In this study, we used 12 yr (1998-2009) of existing multi-source satellite and model-assimilated global weather data. We used a calibrated multi-source satellite data-driven water balance model for Lake Turkana that takes into account model routed runoff, lake/reservoir evapotranspiration, direct rain on lakes/reservoirs and releases from the dam to compute lake water levels. The model evaluates the impact of the Gibe III dam using three different approaches - a historical approach, a rainfall based approach, and a statistical approach to generate rainfall-runoff scenarios. All the approaches provided comparable and consistent results. Model results indicated that the hydrological impact of the Gibe III dam on Lake Turkana would vary with the magnitude and distribution of rainfall post-dam commencement. On average, the reservoir would take up to 8-10 months, after commencement, to reach a minimum operation level of 201 m depth of water. During the dam filling period, the lake level would drop up to 1-2 m (95% confidence) compared to the lake level modeled without the dam. The lake level variability caused by regulated inflows after the dam commissioning were found to be within the natural variability of the lake of 4.8 m. Moreover, modeling results indicated that the hydrological impact of the Gibe III dam would depend on the initial lake level at the time of dam commencement. Areas

  10. Rise and fall of a small ice-dammed lake - Role of deglaciation processes and morphology

    Science.gov (United States)

    Nehyba, Slavomír; Hanáček, Martin; Engel, Zbyněk; Stachoň, Zdeněk

    2017-10-01

    A small ice-dammed lake, which developed along the margin of Nordenskiöldbreen on the northern coast of Adolfbukta, (central Spitsbergen, Svalbard) has been studied by a combination of facies analysis, ground penetrating radar, analysis of photos and satellite imagery, and by surface mapping by Unmanned Aerial Vehicle (drone). The lake existed between the years 1990-2012 and occupied two partial depressions in the bedrock, separated by a bedrock ridge for the dominant period of its history. Whereas the eastern depression was almost completely infilled due to direct fluvial input, the western depression revealed only thin sedimentary cover and was dotted from the eastern depression by an outflow of surficial waters. Gilbert delta deposits with typical tripartite zones of topset, foreset and bottomset were recognised in the eastern depression. Topset was comprised by deposits of a braided river. Foreset is formed by deposits of sediment gravity flows (turbidity currents and debris flows). Bottomset is represented by alternating suspension deposits and deposits of hyperpycnal underflows (low-density turbidity currents). The ruling factors of the evolution of the delta were glacier retreat, bedrock morphology, both affecting the relative lake level, and the rate of sediment delivery. Glacier retreat over stepped and inclined bedrock morphology led to delta prograding and downstepping. The recognised fluvio-deltaic terraces revealed four lake level falls followed by fluvial downcutting, erosion and redeposition of the older deltaic/lake deposits, the shifting of the lake's position towards the damming glacier and the transition of the sediment input in the same direction. The termination of the lake was a result of further glacier retreat and the opening of subglacial drainage.

  11. National Program for Inspection of Non-Federal Dams. Granite Lake Dam (NH 00336) NHWRB 166.02, Connecticut River Basin, Nelson, New Hampshire. Phase I Inspection Report.

    Science.gov (United States)

    1979-05-01

    purpose of a Phase I -. ’- Investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of...na:J t.on,, Ch,-ief 1later Resourecs Enginee2r On Septcm)er 10, �, T inspncted Craulit.t Lake-1 diarn ina Nuoville. at the request of thle Granite

  12. Debris flow from 2012 failure of moraine-dammed lake, Three Fingered Jack volcano, Mount Jefferson Wilderness, Oregon

    Science.gov (United States)

    Sherrod, David R.; Wills, Barton B.

    2014-01-01

    In the late spring or early summer of 2012, a flood emanated from a small moraine-dammed lake on the northeast flank of Three Fingered Jack in the Mount Jefferson Wilderness. Channel erosion or slope collapse breached the natural dam of the lake, leading to a sudden lowering of lake level by 2.8 m and discharge of 12,700 cubic meters (m3) of water. The resulting debris flow formed a bouldery deposit extending about 0.35 km downslope.

  13. Geomorphologically effective floods from moraine-dammed lakes in the Cordillera Blanca, Peru

    Science.gov (United States)

    Emmer, Adam

    2017-12-01

    Outburst floods originating in moraine-dammed lakes represent a significant geomorphological process as well as a specific type of threat for local communities in the Cordillera Blanca, Peru (8.5°-10° S; 77°-78° W). An exceptional concentration of catastrophic floods has been reported from the Cordillera Blanca in the first half of 20th Century (1930s-1950s), leading to thousands of fatalities. The main objective of this paper is to provide a revised and comprehensive overview of geomorphologically effective floods in the area of interest, using various documentary data sources, verified by analysis of remotely sensed images (1948-2013) and enhanced by original field data. Verified events (n = 28; 4 not mentioned before) are analysed from the perspective of spatiotemporal distribution, pre-flood conditions, causes, mechanisms and geomorphological impacts as well as socioeconomical consequences, revealing certain patterns and similar features. GLOFs are further classified according to their magnitude: 5 extreme events, 8 major events and 15 minor events are distinguished, referring to the quantified geomorphological and socioeconomical impacts. Selected moraine dams and flood deposits are dated using lichenometric dating. Special attention is given to moraine dam breaches - the most frequent type of water release with the most significant consequences. Selected major events and their consequences are studied in detail in a separate section. Finally, a general schematic model of lake formation, growth and post-flood evolution reflecting initial topographical setting and glacier retreat is introduced and the utilization of the obtained results is outlined.

  14. Flood management of Dongting Lake after operation of Three Gorges Dam

    Directory of Open Access Journals (Sweden)

    Xi-jun Lai

    2017-10-01

    Full Text Available Full operation of the Three Gorges Dam (TGD reduces flood risk of the middle and lower parts of the Yangtze River Basin. However, Dongting Lake, which is located in the Yangtze River Basin, is still at high risk for potentially severe flooding in the future. The effects of the TGD on flood processes were investigated using a hydrodynamic model. The 1998 and 2010 flood events before and after the operation of the TGD, respectively, were analyzed. The numerical results show that the operation of the TGD changes flood processes, including the timing and magnitude of flood peaks in Dongting Lake. The TGD can effectively reduce the flood level in Dongting Lake, which is mainly caused by the flood water from the upper reach of the Yangtze River. This is not the case, however, for floods mainly induced by flood water from four main rivers in the catchment. In view of this, a comprehensive strategy for flood management in Dongting Lake is required. Non-engineering measures, such as warning systems and combined operation of the TGD and other reservoirs in the catchment, as well as traditional engineering measures, should be further improved. Meanwhile, a sustainable philosophy for flood control, including natural flood management and lake restoration, is recommended to reduce the flood risk.

  15. Satellite Monitoring and Characterization of the 2010 Rockslide-Dammed Lake Gojal, North Pakistan

    Science.gov (United States)

    Leonard, G. J.; Kargel, J. S.; Crippen, R. E.; Evans, S. G.; Delaney, K. B.; Schneider, J. F.

    2010-12-01

    On January 4, 2010, a landslide blocked the Hunza River at Attabad, northern Pakistan (36.308°N, 74.820°E). The landslide destroyed the village of Attabad killing 19 people, and formed a dam approximately 1200m long, 350 meters wide, and 125 meters high. The flow of the Hunza river was blocked for 144 days, forming Lake Gojal. In addition to inundating several villages and submerging 22 km of the regionally critical Karakoram Highway, >25,000 people have been displaced or remain cut off from overland connection with the rest of the country. Lake overtopping began on May 29 via a 15m deep spillway excavated through the saddle of the dam. Remarkably, the slowly eroding natural structure remains largely intact and currently represents a new geologic feature, although a threat remains from possible catastrophic outburst flooding. We have monitored growth of the lake with multi-temporal satellite imagery collected from ASTER (Advanced Spaceborne Thermal and Reflection Radiometer) and ALI (Advanced Land Imager) sensors. We applied NASA’s ASTER Global Digital Elevation Model (GDEM) and SRTM-3 digital terrain data, along with field data obtained onsite by Schneider, and by Pakistan’s NDMA to derive volumes of the growing lake. Lake size peaked during mid-summer when it was ~22 km long, 12 km2, 119m deep, and contained 540 to 620 Mm3 water (SRTM-3 and GDEM +5m global correction estimates respectively). Our estimates indicated lake volumes three to four times higher than media quotes, and before spillover, were used to improve predictions of possible flood discharge and disaster management planning. Estimates of valley inflow based on a 31-year hydrographic history (Archer, D., 2003, Jour. Hydrology 274, 198-210) are consistent with our volume infilling estimates. As early as April 14 our volume assessments, coupled with hydrographic and seepage data were used to project a spillover date range of May 28-June 2, bracketing the actual overflow date. Additionally, we have

  16. Possible application of dam lake as a seasonal solar energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Wakabayshi, Hiroaki; Murata, Hideto; Nishijima, Keiichi [Kanazawa Inst. of Technology, Dep. of Managerial Engineering, Ishikawa (Japan)

    1996-12-31

    For promoting efficient use of energy, a new concept is required that society can choose to make a positive approach toward a solar energy based rural community which maximizes harmony with nature. This basic concept uses a water lake as a thermal energy storage. Thermocline measurements were made at the Uchikawa Dam Lake located in Kanazawa, Ishikawa, Japan to evaluate several kind of exergy contents as a new energy supply potential. The data indicated that the system could be developed with full potential as a seasonal energy storage to be used for mostly regional cooling. This concept seems interesting to invite internationally an energy efficient society to be employed in LDCs as well as in developed countries. (author) 12 figs., 2 tabs., 7 refs.

  17. Dam-breach analysis and flood-inundation mapping for Lakes Ellsworth and Lawtonka near Lawton, Oklahoma

    Science.gov (United States)

    Rendon, Samuel H.; Ashworth, Chad E.; Smith, S. Jerrod

    2012-01-01

    Dams provide beneficial functions such as flood control, recreation, and reliable water supplies, but they also entail risk: dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or misoperation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning the emergency response if a dam breach occurs. Accurate topographic data are vital for developing flood-inundation maps. This report presents results of a cooperative study by the city of Lawton, Oklahoma, and the U.S. Geological Survey (USGS) to model dam-breach scenarios at Lakes Ellsworth and Lawtonka near Lawton and to map the potential flood-inundation areas of such dam breaches. To assist the city of Lawton with completion of the emergency action plans for Lakes Ellsworth and Lawtonka Dams, the USGS collected light detection and ranging (lidar) data that were used to develop a high-resolution digital elevation model and a 1-foot contour elevation map for the flood plains downstream from Lakes Ellsworth and Lawtonka. This digital elevation model and field measurements, streamflow-gaging station data (USGS streamflow-gaging station 07311000, East Cache Creek near Walters, Okla.), and hydraulic values were used as inputs for the dynamic (unsteady-flow) model, Hydrologic Engineering Center's River Analysis System (HEC-RAS). The modeled flood elevations were exported to a geographic information system to produce flood-inundation maps. Water-surface profiles were developed for a 75-percent probable maximum

  18. Prediction of small hydropower plant power production in Himreen Lake dam (HLD using artificial neural network

    Directory of Open Access Journals (Sweden)

    Ali Thaeer Hammid

    2018-03-01

    Full Text Available In developing countries, the power production is properly less than the request of power or load, and sustaining a system stability of power production is a trouble quietly. Sometimes, there is a necessary development to the correct quantity of load demand to retain a system of power production steadily. Thus, Small Hydropower Plant (SHP includes a Kaplan turbine was verified to explore its applicability. This paper concentrates on applying on Artificial Neural Networks (ANNs by approaching of Feed-Forward, Back-Propagation to make performance predictions of the hydropower plant at the Himreen lake dam-Diyala in terms of net turbine head, flow rate of water and power production that data gathered during a research over a 10 year period. The model studies the uncertainties of inputs and output operation and there's a designing to network structure and then trained by means of the entire of 3570 experimental and observed data. Furthermore, ANN offers an analyzing and diagnosing instrument effectively to model performance of the nonlinear plant. The study suggests that the ANN may predict the performance of the plant with a correlation coefficient (R between the variables of predicted and observed output that would be higher than 0.96. Keywords: Himreen Lake Dam, Small Hydropower plants, Artificial Neural Networks, Feed forward-back propagation model, Generation system's prediction

  19. Identification of the glaciers and mountain naturally dammed lakes in the Pskem, the Kashkadarya and the Surhandarya River basins, Uzbekistan, using ALOS satellite data

    Directory of Open Access Journals (Sweden)

    Eleonora Semakova

    2016-05-01

    Full Text Available The glacierized area of Uzbekistan is represented in three river basins – the Pskem, the Kashkadarya and the Surhandarya. This study considers the present state of the glaciers and high-mountain lakes distribution in this area based on the analysis and validation of advanced land observing satellite (ALOS/advanced visible and near infrared radiometer type 2 (AVNIR-2 satellite data. Between the 1960s and the 2010s, the glacierized area decreased by 23% in the Pskem River basin (including the Maydantal, by 49% in the Kashkadarya and by 40% in the Surhandarya (including the Sangardak and the Tupalang River basins. The retreat fairly slowed in the 1980s–2010s. There are 75 glacial lakes and 35 rock-dammed lakes (including landslide-dammed ones in the Pskem River basin, 45% of all the lakes covering the area less than 0.002 km2; 13 glacial lakes and 4 rock-dammed lakes in the Kashkadarya and 34 glacial lakes and 16 rock-dammed lakes in the Surhandarya River basins. The landslide rock-dammed Ikhnach Upper Lake lost 0.04 km2 in size from 1 August 2010 to 30 August 2010 because of the seepage through the rock dam and 0.10 km2 from 1 August to 18 October 2013.

  20. [Heavy metals distribution characteristics and ecological risk evaluation in surface sediments of dammed Jinshan lake].

    Science.gov (United States)

    Zhou, Xiao-Hong; Liu, Long-Mei; Chen, Xi; Chen, Zhi-Gang; Zhang, Jin-Ping; Li, Yi-Min; Liu, Biao

    2014-11-01

    In order to reveal the pollution loading of heavy metals in Dammed Jinshan lake, six heavy metals (As, Cu, Pb, Cd, Zn, Cr) from 18 sediment samples were analyzed using ICP, and the distribution characteristics of heavy metals in the sediment were comprehensively evaluated through concentration coefficient, geo-acumulation indexes, potential ecological risk evaluation and traceability analysis. The results showed that (1) the average contents of As, Pb, Cu, Zn, Cr, Cd were 23.22, 26.20, 24.42, 143.12, 245.30 and 0.67 mg x kg(-1), respectively, in the surface sediments of dammed Jinshan Lake. The average contents of Pb and Cu were lower than the primary standard and secondary standards of soil environmental quality standards. The average contents of Zn and Cr were lower than the primary standard and higher than the secondary standards of soil environmental quality standards. The average contents of As and Cd were higher than the primary and secondary standards of soil environmental quality standards. From the spatial distribution, the contents of Pb and Zn were the highest at sampling site No. 1, which was located at the Beigushan Square. The contents of As,Cu, Cr, Cd were the highest at sampling sites Nos. 12, 3, 14, and 7, respectively; (2) The order of concentration coefficient was As > Cr > Cd > Pb > Zn > Cu, which indicated that the enrichment amount of As was the highest and that of Cu was the lowest; (3) Based on the geo-acumulation indexes, the Cu is clean and Pb, Zn, Cd is the light pollution and As, Cr moderate pollution; (4) The order of Potential ecological risk coefficient was Cd > As > Cr > Pb > Cu > Zn, Cr, Pb, Cu, Zn were of light ecological risk and As, Cd were of medium ecological risk. From the spatial distribution, the sampling sites Nos. 1, 6, 7 and 12 had medium potential ecological risk, and the rest sample points had slight potential ecological risk; (5) The principal component analysis (PCA) revealed that the main reason for the differences

  1. The Application of a Phosphorus Budget Model Estimating the Carrying Capacity of Kesikköprü Dam Lake

    OpenAIRE

    PULATSÜ, Serap

    2014-01-01

    The aim of this study was to estimate the carrying capacity of Kesikköprü Dam Lake, Ankara, where cage farms for the intensive culture of rainbow trout are located. For this purpose Dillon and Rigler's phosphorus budget model was applied in a series of steps and the carrying capacity of the lake was found to be 3335 tonnes per year. This estimated value was about 10 times higher than the present production level of the lake. It seems possible to orientate the fish culture in cages in...

  2. Study of environmental isotope distribution in the Aswan High Dam Lake (Egypt) for estimation of evaporation of lake water and its recharge to adjacent groundwater

    International Nuclear Information System (INIS)

    Aly, A.I.M.; Nada, A.; Awad, M.; Hamza, M.; Salem, W.M.

    1993-01-01

    Oxygen-18 ( 18 O) and deuterium isotopes were used to estimate the evaporation from the Aswan High Dam Lake and to investigate the inter-relation between the lake water and adjacent groundwater. According to stable isotopic analysis of samples taken in 1988 and 1989, the lake can be divided into two sections. In the first section extending between Abu Simbel and a point between El-Alaki and Krosko, a remarkable vertical gradient of 18 O and deuterium isotopic composition was observed. The second northern sector extending to the High Dam is characterised by a lower vertical isotopic gradient. In this sector in general, higher values of 18 O and deuterium contents were found at the top and lower values at the bottom. Also a strong horizontal increase of the heavy isotope content was observed. Thus, in the northern section evaporation is of dominating influence on the isotopic composition of the lake water. With the help of an evaporation pan experiment it was possible to calibrate the evaporative isotope enrichment in the lake and to facilitate a preliminary estimate of evaporative losses of lake water. The evaporation from the lake was estimated to be about 19% of the input water flow rate. The groundwater around the lake was investigated and samples from production wells and piezometers were subjected to isotopic analysis. The results indicate that recent recharge to the groundwater aquifer is limited to wells near to the lake and up to a maximum distance of about 10 km. The contribution of recent Nile water to the groundwater in these wells was estimated to range between 23 and 70%. Beyond this distance, palaeowater was observed with highly depleted deuterium and 18 O contents, which was also confirmed by 14c dating. The age of palaeo groundwater in this area can reach values of more than 26,000 years. Recommendations are given for efficient water management of the lake water. (Author)

  3. Spatial dispersion modeling of 90Sr by point cumulative semivariogram at Keban Dam Lake, Turkey

    International Nuclear Information System (INIS)

    Kuelahci, Fatih; Sen, Zekai

    2007-01-01

    Spatial analysis of 90 Sr artificial radionuclide in consequence of global fallout and Chernobyl nuclear accident has been carried out by using the point cumulative semivariogram (PCSV) technique based on 40 surface water station measurements in Keban Dam Lake during March, April, and May 2006. This technique is a convenient tool in obtaining the regional variability features around each sampling point, which yields the structural effects also in the vicinity of the same point. It presents the regional effect of all the other sites within the study area on the site concerned. In order to see to change of 90 Sr, the five models are constituted. Additionally, it provides a measure of cumulative similarity of the regional variable, 90 Sr, around any measurement site and hence it is possible to draw regional similarity maps at any desired distance around each station. In this paper, such similarity maps are also drawn for a set of distances. 90 Sr activities in lake that distance approximately 4.5 km from stations show the maximum similarity

  4. Glacial lake outburst flood risk assessment using combined approaches of remote sensing, GIS and dam break modelling

    Directory of Open Access Journals (Sweden)

    Arpit Aggarwal

    2016-01-01

    Full Text Available A great number of glacial lakes have appeared in many mountain regions across the world during the last half-century due to receding of glaciers and global warming. In the present study, glacial lake outburst flood (GLOF risk assessment has been carried out in the Teesta river basin located in the Sikkim state of India. First, the study focuses on accurate mapping of the glaciers and glacial lakes using multispectral satellite images of Landsat and Indian Remote Sensing satellites. For glacier mapping, normalized difference snow index (NDSI image and slope map of the area have been utilized. NDSI approach can identify glaciers covered with clean snow but debris-covered glaciers cannot be mapped using NDSI method alone. For the present study, slope map has been utilized along with the NDSI approach to delineate glaciers manually. Glacial lakes have been mapped by supervised maximum likelihood classification and normalized difference water index followed by manual editing afterwards using Google Earth images. Second, the first proper inventory of glacial lakes for Teesta basin has been compiled containing information of 143 glacial lakes. Third, analysis of these lakes has been carried out for identification of potentially dangerous lakes. Vulnerable lakes have been identified on the basis of parameters like surface area, position with respect to parent glacier, growth since 2009, slope, distance from the outlet of the basin, presence of supraglacial lakes, presence of other lakes in downstream, condition of moraine, condition of the terrain around them, etc. From these criterions, in total, 18 lakes have been identified as potentially dangerous glacial lakes. Out of these 18 lakes, further analysis has been carried out for the identification of the most vulnerable lake. Lake 140 comes out to be the most vulnerable for a GLOF event. Lastly, for this potentially dangerous lake, different dam break parameters have been generated using satellite data

  5. Ice-dammed lakes reconstruction in the southeastern Scandinavian ice sheet periphery

    Science.gov (United States)

    Anisimov, Nikolai

    2017-04-01

    The study of glacier erosion processes, paleolake dynamics and topographical changes, together give us insight into both localized and broader landscape evolution patterns while also assisting human exploration. After carrying number of paleographic discoveries of North-West of Russia, we've gathered the data requiring generalizing, systemizing, visualizing. Objective: reconstruction of proglacial lakes based on lithostratigraphic and geomorphic analysis using GIS technology. GIS modeling of ice-dammed lakes was done via the ArcGIS Desktop 10 software package. The GIS was used as a means to categorize published, time mapped data and thereby fuse and unify the changes into a single, integrated prototype. Publications on limnologo-glaciological and geomorphological reconstructions of paleotopography and paleolakes north of the Russian plain, along with additional copyrighted and grant-funded GIS studies, together served as resources to authenticate the paleolake contour modeling. A quaternary sediments map and an updated topography map that was designed via semiautomatic vectorization of a topographical map, served as foundations for the electronic shape modeling paleoreconstructions. Based upon preliminary results from publication summaries, and initial data collected when analyzing the maps (quaternary sediments, geomorphological, topographical), the contours and maximum glacial lake rise levels in the southeastern Scandinavian ice sheet periphery, including the levels and contours of their coastline, have been duly identified. Boundary reconstruction of Late Pleistocene lake boundaries have been completed for five sections of the Scandinavian ice sheet: the Molovo-Sheksninskoy, the Belozersko-Kubensky, the Vozhe-Lachsko-Kubensky, the Vazhskoy, and the Severodvinskoy. The territories studied revealed 13 major paleobasins covering an area of more than 1,000 km2, which based upon their position most closely resemble periglacial, intraglacial and postglacial lakes. Of

  6. 33 CFR 165.T09-0166 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago...

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Safety Zone, Brandon Road Lock... Areas Ninth Coast Guard District § 165.T09-0166 Safety Zone, Brandon Road Lock and Dam to Lake Michigan.... waters of the Des Plaines River located between mile marker 286.0 (Brandon Road Lock and Dam) and mile...

  7. Glacial Lake Pickering: stratigraphy and chronology of a proglacial lake dammed by the North Sea Lobe of the British-Irish Ice Sheet

    OpenAIRE

    Evans, David J.A.; Bateman, Mark D.; Roberts, David H.; Medialdea, Alicia; Hayes, Laura; Duller, Geoff A.T.; Fabel, Derek; Clark, Chris D.

    2016-01-01

    We report the first chronology, using four new optically stimulated luminescence dates, on the sedimentary record of Glacial Lake Pickering, dammed by the North Sea Lobe of the British–Irish Ice Sheet during the Dimlington Stadial (24–11 ka cal BP). Dates range from 17.6 ± 1.0 to 15.8 ± 0.9 ka for the sedimentation of the Sherburn Sands at East Heslerton, which were formed by multiple coalescing alluvial fans prograding into the falling water levels of the lake and fed by progressively larger...

  8. Ice-dammed lateral lake and epishelf lake insights into Holocene dynamics of Marguerite Trough Ice Stream and George VI Ice Shelf, Alexander Island, Antarctic Peninsula

    Science.gov (United States)

    Davies, Bethan J.; Hambrey, Michael J.; Glasser, Neil F.; Holt, Tom; Rodés, Angél; Smellie, John L.; Carrivick, Jonathan L.; Blockley, Simon P. E.

    2017-12-01

    We present new data regarding the past dynamics of Marguerite Trough Ice Stream, George VI Ice Shelf and valley glaciers from Ablation Point Massif on Alexander Island, Antarctic Peninsula. This ice-free oasis preserves a geological record of ice stream lateral moraines, ice-dammed lakes, ice-shelf moraines and valley glacier moraines, which we dated using cosmogenic nuclide ages. We provide one of the first detailed sediment-landform assemblage descriptions of epishelf lake shorelines. Marguerite Trough Ice Stream imprinted lateral moraines against eastern Alexander Island at 120 m at Ablation Point Massif. During deglaciation, lateral lakes formed in the Ablation and Moutonnée valleys, dammed against the ice stream in George VI Sound. Exposure ages from boulders on these shorelines yielded ages of 13.9 to 9.7 ka. Following recession of the ice stream, George VI Ice Shelf formed in George VI Sound. An epishelf lake formed at 15-20 m asl in Ablation and Moutonnée valleys, dated from 9.4 to 4.6 ka, suggesting that the lake was stable and persistent for some 5000 years. Lake-level lowering occurred after this, with the lake level at 12 m at 3.1 ± 0.4 ka and at 5 m asl today. A readvance of the valley glaciers on Alexander Island at 4.4 ± 0.7 ka is recorded by valley glacier moraines overlying epishelf lake sediments. We speculate that the glacier readvance, which occurred during a period of warmth, may have been caused by a dynamic response of the glaciers to a lowering in surface elevation of George VI Ice Shelf.

  9. Integrated Application of Remote Sensing, GIS and Hydrological Modeling to Estimate the Potential Impact Area of Earthquake-Induced Dammed Lakes

    Directory of Open Access Journals (Sweden)

    Bo Cao

    2017-10-01

    Full Text Available Dammed lakes are an important secondary hazard caused by earthquakes. They can induce further damage to nearby humans. Current hydrology calculation research on dammed lakes usually lacks spatial expressive ability and cannot accurately conduct impact assessment without the support of remote sensing, which obtains important characteristic information of dammed lakes. The current study aims to address the issues of the potential impact area estimate of earthquake-induced dammed lakes by combining remote sensing (RS, a geographic information system (GIS, and hydrological modeling. The Tangjiashan dammed lake induced by the Wenchuan earthquake was selected as the case for study. The elevation-versus-reservoir capacity curve was first calculated using the seed-growing algorithm based on digital elevation model (DEM data. The simulated annealing algorithm was applied to train the hydrological modeling parameters according to the historical hydrologic data. Then, the downstream water elevation variational process under different collapse capacity conditions was performed based on the obtained parameters. Finally, the downstream potential impact area was estimated by the highest water elevation values at different hydrologic sections. Results show that a flood with a collapse elevation of at least 680 m will impact the entire downstream region of Beichuan town. We conclude that spatial information technology combined with hydrological modeling can accurately predict and demonstrate the potential impact area with limited data resources. This paper provides a better guide for future immediate responses to dammed lake hazard mitigation.

  10. Special Office Report for Warm Springs Dam and Lake Sonoma. Sonoma County, California. Section 7. Consultation on Endangered Species.

    Science.gov (United States)

    1983-05-01

    wide. The upstream face of the dam is covered with rock for protection against wave action. The downstream face is covered with six inches of top- soil ...over 25 percent), the potential for soil erosion and the sensitive and critical wildlife areas make access to the lake difficult and limit the areas...allow an increase in productivity. However, as a result of eggshell analysis at this site, it has been found that a marked eggshell thinning has occurred

  11. Localized Glacier Deformation Associated with Filling and Draining of a Glacier-Dammed Lake and Implications for Outburst Flood Hydraulics

    Science.gov (United States)

    Cunico, M. L.; Walder, J. S.; Fountain, A. G.; Trabant, D. C.

    2001-12-01

    During the summer of 2000, we measured displacements of 22 survey targets on the surface of Kennicott Glacier, Alaska, in the vicinity of Hidden Creek Lake, an ice-dammed lake in a tributary valley that fills and drains annually. Targets were distributed over a domain about equal in width to the lake, from near the glacier/lake margin to a distance of about 1 km from the margin. Targets were surveyed over a 24-day period as the lake filled and then drained. Lake stage was independently monitored. Vertical movement of targets generally fell off with distance d from the lake. As the lake filled, targets with d typically about 0.5 m/d--with a few targets rising slightly faster than the lake. The rate of vertical movement fell off rapidly with distance from the lake: for d = ca. 600 m--roughly twice the local ice thickness--targets moved upward only about 10% as fast as lake stage. Vertical movement of targets with d > ca. 1 km seemed to be uncorrelated with lake stage. The general pattern is consistent with the idea that a wedge of water extended beneath the glacier to a distance of perhaps 300 to 400 m from the visible margin of the lake and exerts buoyant stresses on the ice that were transmitted into the main body of the glacier and caused flexure. This scenario bears some resemblance to tidal deflections of ice shelves or tidewater glaciers. For a given value of lake stage, target elevations were invariably higher as the lake drained than as the lake filled. Moreover, survey targets at a distance of about 400 m or more from the lake continued to rise for some time even after the lake began to drain. The lag time between the beginning of lake drainage and the beginning of target downdrop increased with distance from the lake, with the lag being about 14 hours at a distance of 400 m from the lake. (The lake drained completely in approximately 75 hours.) The likeliest explanations for the departure from reversibility and the existence of the time lag are either (i) a

  12. SILTATION AND EROSION PROCESSES ON A TRIBUTARY OF LAKE ITAIPU DUE A DAM RESERVOIR

    Directory of Open Access Journals (Sweden)

    Cristiano Poleto

    2012-12-01

    Full Text Available It is known that sediments in the river have their origin from different sources. Therefore, the proportion that each source contributes to the mix varies over time and space, as a result of erosion processes that are ongoing in the basin of contribution. Within this context, both in human actions in urban and rural watersheds generate different rates of sediment production, but mainly with different characteristics or quality. Thus, the fluvial sedimentology should have a broad character within the study area and check all the possible influences of land use and soil. Hydrosedimentological processes are complex and include a disaggregation ("erosion" in the strict definition, transport, sedimentation, consolidation of sediments. Therefore, it is necessary more detailed studies of sediments and their interactions with the environment, considering it as a topic of interest to economic, social and ecological needs of a sustainable management, where they articulate an understanding of the physical and chemical properties of sediments with ecological and hydrological information of the water bodies receiver on a regional scale and thus evaluate the possible scenarios of pollution of water resources. This information will support in decision-making processes for managing the watershed and its water resources. Therefore, this project aims to determine the interference that a hydroelectric plant, together with the lack of proper management of the basin, can cause to the river morphology. The research is conducting a survey of sensitive areas to erode and the influence of a newly installed hydropower in a tributary of Lake Itaipu. Could notice that the removal of riparian vegetation is accelerating the erosion processes at various points of the river, but the agriculture system used in the rural area, without revolving of soil, has reduced the sediment load produced by this source. However, the retention of much of the coarse sediments by the new dam is

  13. Profiling of Sediment Microbial Community in Dongting Lake before and after Impoundment of the Three Gorges Dam

    Directory of Open Access Journals (Sweden)

    Wei Huang

    2016-06-01

    Full Text Available The sediment microbial community in downstream-linked lakes can be affected by the operation of large-scale water conservancy projects. The present study determined Illumina reads (16S rRNA gene amplicons to analyze and compare the bacterial communities from sediments in Dongting Lake (China before and after impoundment of the Three Gorges Dam (TGD, the largest hydroelectric project in the world. Bacterial communities in sediment samples in Dongting Lake before impoundment of the TGD (the high water period had a higher diversity than after impoundment of the TGD (the low water period. The most abundant phylum in the sediment samples was Proteobacteria (36.4%–51.5%, and this result was due to the significant abundance of Betaproteobacteria and Deltaproteobacteria in the sediment samples before impoundment of the TGD and the abundance of Gammaproteobacteria in the sediment samples after impoundment of the TGD. In addition, bacterial sequences of the sediment samples are also affiliated with Acidobacteria (11.0% on average, Chloroflexi (10.9% on average, Bacteroidetes (6.7% on average, and Nitrospirae (5.1% on average. Variations in the composition of the bacterial community within some sediment samples from the river estuary into Dongting Lake were related to the pH values. The bacterial community in the samples from the three lake districts of Dongting Lake before and after impoundment of the TGD was linked to the nutrient concentration.

  14. Pequonnock River Basin, Bridgeport, Connecticut. Forest Lake Dam CT 00078. Phase I Inspection Report. National Dam Inspection Program.

    Science.gov (United States)

    1978-08-01

    Legislation for the protection of wet lands has come too late for this watershed and the remaining small wet lands, if retained, have little value...Ridge Mountains of Central Virginia, 11.55" in Westminister , Maryland and 13" in Steuben County, Pennsylvania. HYDRAULIC ANALYSIS LAKE FOREST Due to

  15. Dam! Dam! Dam!

    International Nuclear Information System (INIS)

    McCully, P.

    1997-01-01

    The author of ''Silenced Rivers'' a book questioning the desirability of dam building and hydroelectric power generation argues the main themes of his book in this paper. Despite being hailed by politicians as good solutions to power generation problems, and enthusiastically pursued in China, the U.S.A., the former Soviet Union, India and Japan, dams have far-reaching ecological and human consequences. The ecosystems lost to flooding, and the agricultural land use lost, the human cost in terms of homes and employment lost to reservoirs, disease from water-borne infections such as malaria, and the hazards of dams overflowing or breaking are all factors which are against the case for dam construction. The author argues the hydroelectric power may be renewable, but the social, agricultural and ecological costs are too high to justify it as a method of first choice. (UK)

  16. Assessment of the Hydro-Ecological Impacts of the Three Gorges Dam on China’s Largest Freshwater Lake

    Directory of Open Access Journals (Sweden)

    Guiping Wu

    2017-10-01

    Full Text Available The Three Gorges Dam (TGD has received increasing attention with respect to its potential effects on downstream hydro-ecosystems. Poyang Lake is the largest freshwater lake downstream of the TGD, and it is not immune to these impacts. Here, we combine hydrological observations, remote sensing, a geographic information system (GIS, and landscape ecology technology to investigate the variability and spatial pattern of the hydro-ecological alterations to Poyang Lake induced by the operation of the TGD. It was found that the TGD caused significant hydro-ecological alterations across the Poyang Lake wetland. Specifically, the TGD operation altered the seasonal inundation pattern of Poyang Lake and significantly reduced the monthly inundation frequencies (IFs, which were especially notable (~30–40% from September to November. Spatially, the declining IFs led to an increase in the mudflat area that is suitable for the growth of vegetation. The vegetation area increased by 58.82 km2 and 463.73 km2 in the low- and high-water season, respectively, with the most significant changes occurring in the estuary delta of the Ganjiang and Raohe rivers. The results also indicated that the changes in the inundation pattern and floodplain vegetation have profoundly altered the structure and composition of the wetland, which has resulted in increased landscape diversity and a gradual increase in the complexity of the ecosystem composition under the influence of regulation of the TGD. Such results are of great importance for policymakers, as they may provide a reference for wetland water resource planning and landscape restoration in an operational dam environment.

  17. Comparative growth models of big-scale sand smelt (Atherina boyeri Risso, 1810 sampled from Hirfanll Dam Lake, Klrsehir, Ankara, Turkey

    Directory of Open Access Journals (Sweden)

    S. Benzer

    2017-06-01

    Full Text Available In this current publication the growth characteristics of big-scale sand smelt data were compared for population dynamics within artificial neural networks and length-weight relationships models. This study aims to describe the optimal decision of the growth model of big-scale sand smelt by artificial neural networks and length-weight relationships models at Hirfanll Dam Lake, Klrsehir, Turkey. There were a total of 1449 samples collected from Hirfanll Dam Lake between May 2015 and May 2016. Both model results were compared with each other and the results were also evaluated with MAPE (mean absolute percentage error, MSE (mean squared error and r2 (coefficient correlation data as a performance criterion. The results of the current study show that artificial neural networks is a superior estimation tool compared to length-weight relationships models of big-scale sand smelt in Hirfanll Dam Lake.

  18. Use of oxidative stress biomarkers in Cyprinus carpio L. for the evaluation of water pollution in Ataturk Dam Lake (Adiyaman, Turkey).

    Science.gov (United States)

    Karadag, Hasan; Fırat, Özgür; Fırat, Özge

    2014-03-01

    Adiyaman city, which is located in the north of the Ataturk Dam Lake, has no wastewater purification facilities which results in municipal, agricultural, and industrial wastewater discharges directly entering the reservoir. To assess the pollution in the dam lake, we used several oxidative stress biomarkers in blood tissue of Cyprinus carpio. Fish samples were taken from Sitilce, polluted area by untreated wastewaters, and Samsat, relatively clean area, in the reservoir in August 2012. The activity of catalase and level of malondialdehyde increased while activity of superoxide dismutase and glutathione level decreased in fish from Sitilce site when compared to Samsat site. The findings of the present investigation suggest that the presence of certain prooxidative compounds that can lead to oxidative stress in the fish at the Sitilce site and oxidative stress biomarkers may be important in order to evaluate the effects of untreated wastewaters on living organisms in the dam lake.

  19. Recent changes in Imja Glacial Lake and its damming moraine in the Nepal Himalaya revealed by in situ surveys and multi-temporal ASTER imagery

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, Koji; Sakai, Akiko; Nuimura, Takayuki [Graduate School of Environmental Studies, Nagoya University, Nagoya 464-8601 (Japan); Yamaguchi, Satoru [Snow and Ice Research Center, National Research Institute for Earth Science and Disaster Prevention, Nagaoka 940-0821 (Japan); Sharma, Rishi R [Department of Hydrology and Meteorology, Ministry of Environment, Science and Technology, Babar Mahal, Kathmandu (Nepal)

    2009-10-15

    Changes in the area and bathymetry of Imja Glacial Lake and in the elevation of its damming moraine, Khumbu region, Nepal Himalaya are investigated. Previously reported changes in the lake area have been updated by multi-temporal ASTER images, which revealed a decreased expansion rate after 2000. A provisional expansion of the lake observed in 2004, from which some studies concluded an accelerated lake expansion due to global warming, has, from 2005, subsided to the glacier surface. Bathymetric changes for the period 1992-2002 that were first obtained for Himalayan glacial lakes suggest that the melting of debris-covered ice beneath the lake is insignificant in terms of the increase in lake volume, and that the retreat of a glacier in contact with the lake by calving is essential for the lake's expansion. Changes in the height of a damming moraine for the period 2001-2007 suggest a continuous surface lowering near the lake, though the lowering rates are smaller than those for the period 1989-1994.

  20. Recent changes in Imja Glacial Lake and its damming moraine in the Nepal Himalaya revealed by in situ surveys and multi-temporal ASTER imagery

    International Nuclear Information System (INIS)

    Fujita, Koji; Sakai, Akiko; Nuimura, Takayuki; Yamaguchi, Satoru; Sharma, Rishi R

    2009-01-01

    Changes in the area and bathymetry of Imja Glacial Lake and in the elevation of its damming moraine, Khumbu region, Nepal Himalaya are investigated. Previously reported changes in the lake area have been updated by multi-temporal ASTER images, which revealed a decreased expansion rate after 2000. A provisional expansion of the lake observed in 2004, from which some studies concluded an accelerated lake expansion due to global warming, has, from 2005, subsided to the glacier surface. Bathymetric changes for the period 1992-2002 that were first obtained for Himalayan glacial lakes suggest that the melting of debris-covered ice beneath the lake is insignificant in terms of the increase in lake volume, and that the retreat of a glacier in contact with the lake by calving is essential for the lake's expansion. Changes in the height of a damming moraine for the period 2001-2007 suggest a continuous surface lowering near the lake, though the lowering rates are smaller than those for the period 1989-1994.

  1. Determination of Heavy Metals in Roach (Rutilus rutilus and Bleak (Alburnus alburnus in Zhrebchevo Dam Lake

    Directory of Open Access Journals (Sweden)

    Georgi I. Zhelyazkov

    2014-04-01

    Full Text Available The aim of this study was to examine the concentration of iron (Fe, nickel (Ni, lead (Pb, manganese (Mn, copper (Cu, chromium (Cr, cadmium (Cd and zinc (Zn in roach (Rutilus rutilus and bleak (Alburnus alburnus as species for human consummation. Two fresh water fish species, roach and bleak were caught from Zhrebchevo Dam Lake in Bulgaria. Determination of heavy metals (Fe, Cu, Ni, Pb, Zn, Mn, Cr and Cd in muscle samples were performed with electrothermal atomic absorption spectrometry (ETAAS. The heavy metal content in the meat of roach and bleak were found to be 0.59±0.032 - 0.69±0.128 mg kg-1 for Cu, 6.59±0.224 - 7.34±0.142 mg kg-1 for Fe, 0.03±0.025 - 0.04±0.012 mg kg-1 for Ni, 0.06±0.044 - 0.07±0.031 mg kg-1 for Pb, 4.05±0.263 - 5.46±0.388 mg kg-1 for Zn, 0.49±0.060 - 0.72±0.080 mg kg-1 for Mn, 0.09±0.036 - 0.1±0.045 mg kg-1 for Cr, 0.01±0.002 - 0.01±0.003 mg kg-1 for Cd. The data show that the differences between the content of Fe, Cu, Mn, Zn, Cr and Ni in roach and bleak are significant, while these ones of Pb and Cd are not significant. The significant differences in the content of heavy metals in muscles of roach and bleak are as a result of multiple factors, including season, food, chemical properties of water or sediment. The data established during the investigation show that the edible part of fish do not carry heavy metals loads and concentrations are below the legal value for fish and fish products established by the Food and Agriculture Organization and national legislation. This paper is helpful to consumers and academics concerning the mineral of body composition of roach (Rutilus rutilus, and bleak (Alburnus alburnus.

  2. Will the Three Gorges Dam affect the underwater light climate of Vallisneria spiralis L. and food habitat of Siberian crane in Poyang Lake?

    NARCIS (Netherlands)

    Wu, G.; Leeuw, de J.; Skidmore, A.K.; Prins, H.H.T.; Best, E.P.H.; Liu, Y.

    2009-01-01

    Almost 95% of the entire population of the Siberian crane (Grus leucogeranus) winter in Poyang Lake, China, where they forage on the tubers of the submerged aquatic macrophyte Vallisneria spiralis. The Three Gorges Dam on the Yangtze River may possibly affect this food source of the Siberian crane

  3. An approach for estimating the breach probabilities of moraine-dammed lakes in the Chinese Himalayas using remote-sensing data

    Directory of Open Access Journals (Sweden)

    X. Wang

    2012-10-01

    Full Text Available To make first-order estimates of the probability of moraine-dammed lake outburst flood (MDLOF and prioritize the probabilities of breaching posed by potentially dangerous moraine-dammed lakes (PDMDLs in the Chinese Himalayas, an objective approach is presented. We first select five indicators to identify PDMDLs according to four predesigned criteria. The climatic background was regarded as the climatic precondition of the moraine-dam failure, and under different climatic preconditions, we distinguish the trigger mechanisms of MDLOFs and subdivide them into 17 possible breach modes, with each mode having three or four components; we combined the precondition, modes and components to construct a decision-making tree of moraine-dam failure. Conversion guidelines were established so as to quantify the probabilities of components of a breach mode employing the historic performance method combined with expert knowledge and experience. The region of the Chinese Himalayas was chosen as a study area where there have been frequent MDLOFs in recent decades. The results show that the breaching probabilities (P of 142 PDMDLs range from 0.037 to 0.345, and they can be further categorized as 43 lakes with very high breach probabilities (P ≥ 0.24, 47 lakes with high breach probabilities (0.18 ≤ P < 0.24, 24 lakes with mid-level breach probabilities (0.12 ≤ P < 0.18, 24 lakes with low breach probabilities (0.06 ≤ P < 0.12, and four lakes with very low breach probabilities (p < 0.06.

  4. Hydro-dam - A nature-based solution or an ecological problem: The fate of the Tonlé Sap Lake.

    Science.gov (United States)

    Lin, Zihan; Qi, Jiaguo

    2017-10-01

    Recent proliferation of hydro-dams was one of the nature-based solutions to meet the increasing demand for energy and food in the Lower Mekong River Basin (LMRB). While construction of these hydro-dams generated some hydropower and facilitated expansion of irrigated lands, it also significantly altered the basin-wide hydrology and subsequently impacted wetland ecosystems. Unintended adverse consequences of ecosystem services from lakes and wetlands offset the intended gains in hydroelectricity and irrigated agriculture. The trade-offs between gains in energy and food production and losses in aquatic ecosystem services were perceived to be significant but knowledge of the magnitude, spatial extent, and type of ecosystem services change is lacking and, therefore, the question whether the hydro-dam is an optimized solution or a potential ecological problem remains unanswered. In this study, as the first step to answer this question and using the Tonlé Sap Lake as an example, we quantified one of the impacts of hydro-dams on lake ecosystem's phenology in terms of open water area, a critical ecological characteristic that affects lake systems' fish production, biodiversity, and livelihoods of the local communities. We used the MODIS-NDVI time series, forecast function and the Mann-Kendall trend test method to first quantify the open water area, analyzed its changes over time, and then performed correlation analysis with climate variables to disentangle dam impacts. The results showed reduced hydro-periods, diminishing lake seasonality and a declining trend in Tonlé Sap Lake open water area over the past 15 years. These changes were insignificantly related to climatic influence during the same period. It is concluded that basin-wide hydro-dam construction and associated agricultural irrigation were deemed to be the primary cause of these ecological changes. Further analyses of changes in the lake's ecosystem services, including provision and cultural services, need to

  5. Biological data for water in Lake Powell and from Glen Canyon Dam releases, Utah and Arizona, 1990–2009

    Science.gov (United States)

    Vernieu, William S.

    2015-10-06

    Biological samples from various locations on Lake Powell and in the Colorado River in the tail water downstream of Glen Canyon Dam were collected by the Bureau of Reclamation and U.S. Geological Survey from December 1990 through December 2009 as part of a long-term water-quality monitoring program that began in 1964. These samples consisted of discrete (1-m deep) chlorophyll samples, discrete (1-m deep) wholewater phytoplankton samples, and 30-m vertically composited zooplankton samples filtered through an 80-µm plankton net. Chlorophyll concentration was determined by acetone extraction followed by trichromatic spectroscopy on 2,051 samples. Phytoplankton analysis consisted of identification to the genus or species level, enumeration, and estimation of biovolume on 1,397 samples. Phytoplankton analysis identified 646 different phytoplankton taxa. Zooplankton analysis consisted of identification to the genus or species level, enumeration, and estimation of biomass from 1,898 samples. Zooplankton analysis identified 114 different zooplankton taxa.

  6. Local monitoring program for invasion of zebra mussel (Dreissena polymorpha) in the Dam lake Zhrebchevo, Bulgaria

    OpenAIRE

    Stoyanova, Stefka; Nikolov, Galin; Velichkova, Katya; Atanasoff, Alexander; Mumun, Sevdegul

    2015-01-01

    Zebra mussels (Dreissena polymorpha) are bivalve mollusks approximately 1 to 5 cm long that live in freshwater lakes. They have invaded many Bulgarian freshwater ecosystems in recent decades. Because of their ability to settle on almost any substrate, zebra mussels cause severe damage to closed water systems, RAS and intensive fish farming systems. In order to assess the status of the mussel population in the lake in the area of the Forest group fish farm, the distribution, extent of coloniza...

  7. Automated lake-wide erosion predictions and economic damage calculations upstream of the Moses-Saunders power dam

    International Nuclear Information System (INIS)

    Zuzek, P.; Baird, W.F.; International Joint Commission, Ottawa, ON

    2008-01-01

    This presentation discussed an automated flood and erosion prediction system designed for the upstream sections of the Moses-Saunders power dam. The system included a wave prediction component along with 3-D maps, hourly run-ups, geographic information system (GIS) tools and a hazard analysis tool. Parcel, reach, township, and county databases were used to populate the system. The prediction system was used to develop detailed study sites of shore units in the study area. Shoreline classes included sand and cohesive buffs, low banks, coarse beaches, and cobble or boulder lags. Time series plots for Lake Ontario water and wave levels were presented. Great Lakes ice cover data were also included in the system as well as erosion predictions from 1961 to 1995. The system was also used to develop bluff recession equations and cumulative recession analyses for different regulation plans. Cumulative bluff recession and protection requirements were outlined. Screenshots of the flood and erosion prediction system interface were also included. tabs., figs

  8. Seismic observations of subglacial water discharge from glacier-dammed lake drainage at Lemon Creek Glacier, Alaska

    Science.gov (United States)

    Labedz, C. R.; Bartholomaus, T. C.; Gimbert, F.; Amundson, J. M.; Vore, M. E.; Karplus, M. S.; Tsai, V. C.

    2017-12-01

    Subglacial water flow affects the dynamics of glaciers, influencing basal sliding, sediment transport, fracturing, and terminus dynamics. However, the difficulty of directly observing glacial hydrologic systems creates significant challenges in understanding such glacier behavior. Recently-developed descriptions of ground motion generated by subglacial water flow provide a promising basis for new and unique characterization of glacial hydrologic systems. Particularly, high-frequency ( 1.5-20 Hz) seismic tremor observed near glaciers has been shown to correlate with subglacial runoff. In addition, specific properties of subglacial water flow like water pressure, conduit size, sediment flux, and grain size can be inferred by examining hysteretic behavior over time between different parts of these signals. In this study, we observe the seismic signals generated by subglacial water flow using a high-density array of more than 100 nodes deployed for 10-25 days, and six broadband seismometers deployed for 80 days at Lemon Creek Glacier, Alaska. Specifically, we examine the 36-hour drainage of a glacier-dammed lake into subglacial conduits, comparing hydrologic metrics such as lake level, precipitation, and outlet stream flow rate to the power of seismic signals. Our node array captures this annually-significant hydraulic transient with sensors spaced approximately every 250 m over the majority of the 5.7 km long glacier. This and other lake drainage events provide natural experiments for exploring glaciohydraulic tremor, because the increased water flux through the glacier increases the power of the tremor and hosts the hysteretic behaviors described previously. Analysis of the tremor from events such as this can be extended to further understand subglacial runoff at Lemon Creek glacier and for glacier hydrology in general.

  9. Endangering of the dam stability of Palcacocha Lake by slope movements, in Peru

    Czech Academy of Sciences Publication Activity Database

    Vilímek, V.; Zapata, M. L.; Klimeš, Jan; Patzelt, Z.; Santillán, N.

    2005-01-01

    Roč. 2, č. 2 (2005), s. 107-115 ISSN 1612-510X Grant - others:GA MŠk(CZ) LA 157 Institutional research plan: CEZ:AV0Z30460519 Keywords : landslides * glacial lakes * Cordillera Blanca Subject RIV: DC - Siesmology, Volcanology, Earth Structure

  10. Four decades of wetland changes of the largest freshwater lake in China in response to the Three Gorges Dam

    Science.gov (United States)

    Feng, L.

    2017-12-01

    Wetlands provide important ecosystem functions for water alteration and conservation of bio-diversity, yet they are vulnerable to both human activities and climate changes. Using four decades of Landsat, MODIS and HJ-1A/1B satellites observations, the long-term wetland changes in Poyang Lake, the largest freshwater lake of China, have been investigated in this study. A Support Vector Machines (SVM) method was firstly developed to obtain wetland classification maps of major cover types between 1973 and 2013 using Landsat and HJ-1A/1B images. A statistically significant increasing trend of the wetland vegetation (15.9 km2 year-1) was found, where the vegetation tended to spread into the lake center in the past four decades. While the transitions from mudflat to vegetation and vice versa were comparable before 2001, vegetation area increased by 620.8 km2 (16.6% of the lake area) between 2001 and 2013. Then, a phenology-based decision tree approach was developed to classify wetland vegetation at community level, with the help of the spatial and spectral information of frequent MODIS observations between 2000 and 2014. MODIS wetland maps confirmed the replacement of water and mudflat by expanded vegetated areas since the impoundment of the Three Gorges Dam (TGD), where both the total coverage of vegetation and the area of each community showed significantly increasing trends. More importantly, results indicated that the vegetation community transitions occurred mainly from hydrophilic cover types to those adapted to dryer conditions. Hydrological analysis revealed that 1) the relationships between the water levels and vegetation coverage showed two regimes for the pre-TGD period (before 2003) and post-TGD period (after 2003); and 2) despite the significant changes in wetland cover types, the most preferable water depth for each cover type remained stable before and after the TGD. The findings here unambiguously led to the conclusion that the landscape changes seen in

  11. Radioactivity assessment of the waste deposited in Candonga's lake after the FundÃO Dam's collapse

    Energy Technology Data Exchange (ETDEWEB)

    Freire, Carolina Braccini; Cuccia, Valeria; Lameiras, Fernando Soares; Rocha, Zildete, E-mail: cbf@cdtn.br, E-mail: vc@cdtn.br, E-mail: fsl@cdtn.br, E-mail: rochaz@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil); Santos, Talita Oliveira, E-mail: talitaolsantos@yahoo.com.br [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG (Brazil). Departamento de Anatomia e Imagem; Sales, Gabriel Lopes, E-mail: gabriellopessales@hotmail.com [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte (Brazil). Dept. de Engenharia Química

    2017-07-01

    The collapse of the Fundão dam on November 5{sup th} 2015 caused impacts along the hydrographic basin of Rio Doce. Renova Foundation has the mission to repair, restore and reconstruct the regions affected by this disaster. After the collapse, a huge amount of waste was deposited in Risoleta Neves Hydroelectric Power Plant’s lake (Candonga). This waste has been dredged out from the lake and deposited in a nearby pile. The use of the waste from this pile is being considered for civil construction. Samples of this waste pile were collected and they were characterized by X-rays diffraction and EDS analyses, which showed that it consists of 80% quartz, 11% hematite, 8% goethite and 1% clays, mainly kaolinite. There is also organic matter consisting of branches, roots and leaves of trees and plants. Previous radiological analyses made before the collapse showed that the radionuclide content of the waste deposited in Fundão dam was very low. However, the waste deposited in Candonga's lake has a new composition and it is important to evaluate its radioactivity assessment. The analyses results of the Candonda's waste samples will be presented and compared to the results obtained in the Fundão dam samples, before its collapse. (author)

  12. Radioactivity assessment of the waste deposited in Candonga's lake after the FundÃO Dam's collapse

    International Nuclear Information System (INIS)

    Freire, Carolina Braccini; Cuccia, Valeria; Lameiras, Fernando Soares; Rocha, Zildete; Santos, Talita Oliveira; Sales, Gabriel Lopes

    2017-01-01

    The collapse of the Fundão dam on November 5 th 2015 caused impacts along the hydrographic basin of Rio Doce. Renova Foundation has the mission to repair, restore and reconstruct the regions affected by this disaster. After the collapse, a huge amount of waste was deposited in Risoleta Neves Hydroelectric Power Plant’s lake (Candonga). This waste has been dredged out from the lake and deposited in a nearby pile. The use of the waste from this pile is being considered for civil construction. Samples of this waste pile were collected and they were characterized by X-rays diffraction and EDS analyses, which showed that it consists of 80% quartz, 11% hematite, 8% goethite and 1% clays, mainly kaolinite. There is also organic matter consisting of branches, roots and leaves of trees and plants. Previous radiological analyses made before the collapse showed that the radionuclide content of the waste deposited in Fundão dam was very low. However, the waste deposited in Candonga's lake has a new composition and it is important to evaluate its radioactivity assessment. The analyses results of the Candonda's waste samples will be presented and compared to the results obtained in the Fundão dam samples, before its collapse. (author)

  13. Changes of Vegetation Distribution in the East Dongting Lake After the Operation of the Three Gorges Dam, China

    Directory of Open Access Journals (Sweden)

    Jia-Yu Hu

    2018-05-01

    Full Text Available Water regime is regarded as the primary factor influencing the vegetation distribution in natural wetland ecosystems. However, the effect of water regime change induced by large-scale hydraulic engineering on vegetation distribution is still unclear. In this study, multi-temporal TM/ETM+/OLI images and hydrological data from 1995 to 2015 were used to elucidate how the change in water regime influenced the vegetation distribution in the East Dongting Lake (EDTL, especially after the operation of the Three Gorges Dam (TGD in 2003. Using unsupervised and supervised classification methods, three types of land cover were identified in the study area: Water and Mudflat, Grass, and Reed and Forest. Results showed that the total vegetation area in EDTL increased by approximately 78 km2 during 1995–2015. The areas of Reed and Forest and Grass exhibited a contrasting trend, dramatic increase in Reed and Forest but sharp decrease in Grass, particularly after the operation of TGD. The lowest distribution elevations of Grass and Reed and Forest decreased by 0.61 and 0.52 m, respectively. As a result of water level variation, submergence duration increased at 20–21 m and 28 m elevations (1–13 days, but significantly decreased at 22–27 m and 29–30 m elevations (-3 to -31 days. The submergence duration of Grass and Reed and Forest was 246 and 177 days, respectively. This study indicated that wetland vegetation pattern significantly changed after the operation of TGD, mainly as a result of changes in submergence condition. Submergence duration might be an effective indicator to predict the shift of vegetation distribution in EDTL, and which could provide scientific guidance for vegetation restoration and wetland management in this lake.

  14. IMPACT OF THE ATATÜRK DAM LAKE ON AGRO-METEOROLOGICAL ASPECTS OF THE SOUTHEASTERN ANATOLIA REGION USING REMOTE SENSING AND GIS ANALYSIS

    Directory of Open Access Journals (Sweden)

    O. Ozcan

    2012-07-01

    Full Text Available The Atatürk Dam is the fourth largest clay-cored rock fill dam in the world. It was constructed on the Euphrates River located in semi-arid Southeastern Turkey in the 1980s as the central component of a large-scale regional development project for the Southeastern Anatolia region (referred to as GAP. The construction began in 1983 and was completed in 1990. The dam and the hydroelectric power plant, which went into service after filling up the reservoir was accomplished in 1992. The Atatürk Dam, which has a height of 169 m, a total storage capacity of 48.7 million m3, and a surface area of about 817 km2 plays an important role in the development of Turkey's energy and agriculture sectors. In this study, the spatial and temporal impacts of the Atatürk Dam on agro-meteorological aspects of the Southeastern Anatolia region have been investigated. Change detection and environmental impacts due to water-reserve changes in Atatürk Dam Lake have been determined and evaluated using multi-temporal Landsat satellite imageries and meteorological datasets within a period of 1984 to 2011. These time series have been evaluated for three time periods. Dam construction period constitutes the first part of the study. Land cover/use changes especially on agricultural fields under the Atatürk Dam Lake and its vicinity have been identified between the periods of 1984 to 1992. The second period comprises the 10-year period after the completion of filling up the reservoir in 1992. At this period, Landsat and meteorological time-series analyses are examined to assess the impact of the Atatürk Dam Lake on selected irrigated agricultural areas. For the last 9-year period from 2002 to 2011, the relationships between seasonal water-reserve changes and irrigated plains under changing climatic factors primarily driving vegetation activity (monthly, seasonal, and annual fluctuations of rainfall rate, air temperature, humidity on the watershed have been investigated

  15. Passage survival of juvenile steelhead, coho salmon, and Chinook salmon in Lake Scanewa and at Cowlitz Falls Dam, Cowlitz River, Washington, 2010–16

    Science.gov (United States)

    Liedtke, Theresa L.; Kock, Tobias J.; Hurst, William

    2018-04-03

    A multi-year evaluation was conducted during 2010–16 to evaluate passage survival of juvenile steelhead (Oncorhynchus mykiss), Chinook salmon (O. tshawytscha), and coho salmon (O. kisutch) in Lake Scanewa, and at Cowlitz Falls Dam in the upper Cowlitz River Basin, Washington. Reservoir passage survival was evaluated in 2010, 2011, and 2016, and included the tagging and release of 1,127 juvenile salmonids. Tagged fish were released directly into the Cowlitz and Cispus Rivers, 22.3 and 8.9 km, respectively, upstream of the reservoir, and were monitored as they moved downstream into, and through the reservoir. A single release-recapture survival model was used to analyze detection records and estimate reservoir passage survival, which was defined as successful passage from reservoir entry to arrival at Cowlitz Falls Dam. Tagged fish generally moved quickly downstream of the release sites and, on average, arrived in the dam forebay within 2 d of release. Median travel time from release to first detection at the dam ranged from 0.23 to 0.96 d for juvenile steelhead, from 0.15 to 1.11 d for juvenile coho salmon, and from 0.18 to 1.89 d for juvenile Chinook salmon. Minimum reservoir passage survival probabilities were 0.960 for steelhead, 0.855 for coho salmon and 0.900 for Chinook salmon.Dam passage survival was evaluated at the pilot-study level during 2013–16 and included the tagging and release of 2,512 juvenile salmonids. Juvenile Chinook salmon were evaluated during 2013–14, and juvenile steelhead and coho salmon were evaluated during 2015–16. A paired-release study design was used that included release sites located upstream and downstream of Cowlitz Falls Dam. The downstream release site was positioned at the downstream margin of the dam’s tailrace, which allowed dam passage survival to be measured in a manner that included mortality that occurred in the passage route and in the dam tailrace. More than one-half of the tagged Chinook salmon (52 percent

  16. National Dam Inspection Program. Ingham Creek (Aquetong Lake) Dam (NDI ID PA 00224, PA DER 9-49) Delaware River Basin, Ingham Creek, Pennsylvania. Phase I Inspection Report,

    Science.gov (United States)

    1981-04-01

    Delaware River Basing Ingham Justif icaticn--- L Creek, Pennsylvania. Phase I Inspection Do DEL-AWARE RIVER BASIN Availabilit T Co~es Avail and/or D...about 1.5H:IV and an unknown upstream slope below the water surface. The dam impounds a reservoir with a normal pool surface area of 12.4 acres and a...deep. It was once used to direct water to a mill downstream of the dam and is now in poor condition. The spillway Design Flood (SDF) chosen for this

  17. Geochemical investigation of Sasa tailings dam material and its influence on the Lake Kalimanci surficial sediments (Republic of Macedonia – preliminary study

    Directory of Open Access Journals (Sweden)

    Petra Vrhovnik

    2011-12-01

    Full Text Available This research is aimed at investigating the mineralogical characteristics of the tailings material and heavy metal contents of the tailings material deposited close to the Sasa Pb-Zn Mine in the Osogovo Mountains (eastern Macedonia and on its possible impact on Lake Kalimanci. The mineral composition of Sasa Mine tailings materialis dominated by quartz, pyrite, galena, sphalerite, magnetite and others. Geochemical analysis was performed in a certified commercial laboratory for the following elements: Mo, Cu, Pb, Zn, Ni, As, Cd, Sb, Bi, Ag, Al, Fe, Mn, S.Analysis revealed very high concentrations of toxic metals in the tailing material – with average values [ mg kg-1]:Mo 2.9, Cu 279, Pb 3975, Zn 5320, Ni 30, As 69, Cd 84, Sb 4.2, Bi 9.4 and Ag 4.1. The multi-element contamination of Sasa Mine tailings material was assigned a pollution index greater of 15, indicating that the tailings material from Sasa Mine contains very high amounts of toxic metals and represents a high environmental risk for surrounding ecosystems. For this reason the influence of discharged tailings dam material into Lake Kalimanci which liesapproximately 12 km lower than Sasa Mine, was also established. Calculated pollution index values for Lake Kalimancisediments vary from 21 to 65 and for Sasa mine surficial tailings dam material from 15 to 60.

  18. National Dam Safety Program. Lake Como Dam (DE 00028), Delaware River Basin, Mill Creek, Kent County, Delaware. Phase I Inspection Report.

    Science.gov (United States)

    1980-11-01

    STATEMENT (of the abstract antarod in Block 20, It different frm Report) III. SUPPLEMENTARY NOTES Copies are obtainable from National Technical...should employ a professional engineer experienced in operation and maintanance of darns to develop written operating procedures and a periodic...100 YEAR FLOOD WOULD CAUSE A DAM TO bE OVERTOPPED THEREFORE THE OWNER SHOULD ENGAGE A QUALIFIED PkOFEbSIONAL CONSULTANT USING MORE PERCISE METHODS

  19. Connection of the Late Paleolithic archaeological sites of the Chuya depression with geological evidence of existence of the Late Pleistocene ice-dammed lakes

    Science.gov (United States)

    Agatova, A. R.; Nepop, R. K.

    2017-07-01

    The complexity of the age dating of the Pleistocene ice-dammed paleolakes in the Altai Mountains is a reason why geologists consider the Early Paleolithic archaeological sites as an independent age marker for dating geological objects. However, in order to use these sites for paleogeographic reconstructions, their locations, the character of stratification, and the age of stone artifacts need to be comprehensively studied. We investigate 20 Late Paleolithic archaeological sites discovered in the Chuya depression of the Russian Altai (Altai Mountains) with the aim of their possible use for reconstructions of the period of development of the Kurai-Chuya glacio-limnosystem in the Late Neopleistocene. The results of our investigation show that it is improper to use the Paleolithic archaeological sites for the dating of the existence period and the draining time of ice-dammed lakes of the Chuya Depression in the modern period of their study owing to a lack of quantitative age estimates, a wide age range of possible existence of these sites, possible redeposition of the majority of artifacts, and their surface occurrence. It is established that all stratified sites where cultural layers are expected to be dated in the future lie above the uppermost and well-expressed paleolake level (2100 m a.s.l.). Accordingly, there are no grounds to determine the existence time of shallower paleolakes. Since the whole stone material collected below the level of 2100 m a.s.l. is represented by surface finds, it is problematic to use these artifacts for absolute geochronology. The Late Paleolithic Bigdon and Chechketerek sites are of great interest for paleogeographic reconstructions of ice-dammed lakes. The use of iceberg rafting products as cores is evidence that these sites appeared after the draining of a paleolake (2000 m a.s.l.). At this time, the location of these archaeological sites on the slope of the Chuya Depression allows one to assume the existence of a large lake as deep

  20. Physical and chemical investigation of water and sediment of the Keban Dam Lake, Turkey. Part 2. Distribution of radioactivity, heavy metals and major elements

    International Nuclear Information System (INIS)

    Kulahci, F.; Dogru, M.

    2006-01-01

    Thirtynine surface water and 20 deep sediment samples were taken in different locations in Keban Dam Lake (Elazig, Turkey) to identify major sources and assess major elements, heavy metals, 137 Cs, 90 Sr, total alpha- and, total beta-distribution in 2003 and 2004 in four seasons each year. As a preliminary study heavy metal (Zn, Fe, Mn, Ni, Cu, Cr, and Co), major element (Mg, Ca, Na, K) and radioactivity concentrations of 137 Cs, 90 Sr, total-α and total-β in the surface water and deep sediments were determined. (author)

  1. National Dam Safety Program. Lock C-12 Dam, Inventory Number NY-796. Lake Champlain Basin, Washington County, NY. Phase I Inspection Report,

    Science.gov (United States)

    1980-06-27

    Inspection Personnel R. WAPA0* DEk W. L’C c. Persons Contacted (Including Address & Phone No.) N S-DeT - £pI 1 W. CL&LLIGM ( CAMAL SEgT. OPF1M:SFII ST) 747...kI/_A, c. Unusual Conditions Which Affect Dam $I.E AM Q&ALOA CAMAL k 1 /P4 fb~t S4.OFE SLOQtH~im if FbpL 0=29- EflLQ FLE𔃾 IIQ 6) Area Downstream of

  2. Landslide-dammed lake at Tangjiashan, Sichuan province, China (triggered by the Wenchuan Earthquake, May 12, 2008): Risk assessment, mitigation strategy, and lessons learned

    Science.gov (United States)

    Cui, P.; Dang, C.; Zhuang, J.; You, Y.; Chen, X.; Scott, K.M.

    2012-01-01

    Landslides and rock avalanches triggered by the 2008 Wenchuan Earthquake produced 257 landslide dams, mainly situated along the eastern boundary of the Qinghai-Tibet Plateau where rivers descend approximately 3,000 m into the Sichuan Basin. The largest of these dams blocked the Tongkou River (a tributary of the Fujiang River) at Tangjiashan. The blockage, consisting of 2. 04 ?? 10 7 m 3 of landslide debris, impounded a lake with a projected maximum volume of 3. 15 ?? 10 8 m 3, potentially inundating 8. 92 km 2 of terrain. Its creation during the rainy season and the possibility of an uncontrolled release posed a serious, impending threat to at least 1. 3 million people downstream that could add substantially to the total of 69,200 individuals directly killed by the earthquake. Risk assessment of the blockage indicated that it was unlikely to collapse suddenly, and that eventual overtopping could be mitigated by notching the structure in order to create an engineered breach and achieve safe drainage of the lake. In addition to the installation of monitoring and warning instrumentation, for emergency planning we estimated several outburst scenarios equivalent to 20, 25, 33, and 50% of the dam failing suddenly, creating, respectively, 3. 35, 3. 84, 4. 22, and 4. 65 km 2 of flooded area, and overbank water depths of 4. 6, 5. 1, 5. 7, and 6. 2 m, respectively, in Mianyang, the second largest city in Sichuan Province, 48 km downstream from the blockage. Based on these scenarios, recommendations and plans for excavating a sluiceway, draining the lake, and downstream evacuation were proposed and later were implemented successfully, with the blockage breached by overtopping on June 10, less than a month after dam emplacement. The peak discharge of the release only slightly exceeded the flood of record at Mianyang City. No lives were lost, and significant property damage was avoided. Post-breaching evaluation reveals how future similar mitigation can be improved. Although

  3. Joint Geodetic and Seismic Analysis of the effects of Englacial and Subglacial Hydraulics on Surface Crevassing near a Seasonal, Glacier-Dammed Lake on Gornergletscher, Switzerland

    Science.gov (United States)

    Garcia, L.; Luttrell, K. M.; Kilb, D. L.; Walter, F.

    2017-12-01

    Glacial outburst floods are difficult to predict and threaten human life and property near glaciated regions. These events are characterized by rapid draining of glacier-dammed lakes via the sub/englacial hydraulic network to the proglacial stream. The glacier-dammed lake on Gornergletscher in Switzerland, which fills and drains each summer, provides an opportunity to study this hazard. For three drainages (2004, 2006, and 2007), we track icequakes (IQ) and on-ice GPS movement. Our seasonal seismic networks had 8 - 24 three component stations and apertures of about 300 - 400 m on the glacier surface. The seasonal GPS arrays contained 4 - 8 GPS antennae on the glacier surface. Using Rayleigh wave coherence surface IQ location, we located 2924, 7822 and 3782 IQs, in 2004, 2006 and 2007, respectively. The GPS data were smoothed using a nonparametric protocol, with average station velocities of 10 - 90 mm/day. In 2006, strains were calculated using five stations within 500 m of the lake, co-located with the seismic network. IQ productivity increased substantially during lake drainage only in 2004, which was the only year when the lake drainage was rapid ( 6 days) and primarily subglacial. In 2006, there was no obvious increase in GPS speeds with slow ( 21 days), supraglacial lake drainage. However, when drainage was subglacial as in 2004 and 2007 (sub/englacial over 11 days), GPS speed increased up to 160%. This speed increase is evidence for basal sliding induced by subglacial drainage. In general, we find that when the strain increase on the principle extension axis aligns with the crevasse opening direction, IQ are more prolific. We also observe a diurnal signal in both IQ occurrence and surface strain, with peak strain occurring in the mid- to late-afternoon (15:00 - 19:00 local) across the study area in 2006. We interpret this time-shift in strain and spatiotemporal dependence of IQs to be caused by diurnal variations in melt-induced sliding. Our analysis sheds

  4. National Dam Safety Program. Lindys Lake Dam (NJ00201), Passaic River Basin, Branch of West Brook, Passaic County, New Jersey. Phase 1 Inspection Report.

    Science.gov (United States)

    1980-02-01

    shallow ground moraine over rock. The downstream channel is described as swamp. The rock is described on Geologic Overlay Sheet 22, as hornblende granite ...DAM 410-04’ hqa Scale: I" =I Mite LEGEND: PRECAMBRIAN gh Mostly Hornblende Granite and Gneiss. hqa Hyperstene-Quartz- And esine.-Gneiss. GEOLOGIC MAP L...A.J. 0o2o/) S CZ6 -§&S5 /,r/ C,4 7-1 ,4V-etaoe Dep4e&/LaL L* rt~~~c~~t4’A aeS’ OP~ ~ A AI 3CD PS?7V7,/ & zAer ’, ! v’.’:7- z - 6 c ,, ,, ,,g

  5. Habitat quality and recruitment success of cui-ui in the Truckee River downstream of Marble Bluff Dam, Pyramid Lake, Nevada

    Science.gov (United States)

    Scoppettone, G. Gary; Rissler, Peter H.; Salgado, J. Antonio; Harry, Beverly

    2013-01-01

    We compared cui-ui (Chasmistes cujus) recruitment from two reaches of the Truckee River with histories of severe erosional downcutting caused by a decline in Pyramid Lake surface elevation. In 1975, Marble Bluff Dam (MBD) was constructed 5 kilometers upstream of the extant mouth of the Truckee River to stabilize the upstream reach of the river; the downstream reach of the river remained unstable and consequently unsuitable for cui-ui recruitment. By the early 2000s, there was a decrease in the Truckee River’s slope from MBD to Pyramid Lake after a series of wet years in the 1990s. This was followed by changes in river morphology and erosion abatement. These changes led to the question as to cui-ui recruitment potential in the Truckee River downstream of MBD. In 2012, more than 7,000 cui-ui spawners were passed upstream of MBD, although an indeterminate number of cui-ui spawned downstream of MBD. In this study, we compared cui-ui recruitment upstream and downstream of MBD during a Truckee River low-flow year (2012). Cui-ui larvae emigration to Pyramid Lake began earlier and ended later downstream of MBD. A greater number of cui-ui larvae was produced downstream of MBD than upstream. This also was true for native Tahoe sucker (Catostomus tahoensis) and Lahontan redside (Richardsonius egregius). The improved Truckee River stability downstream of MBD and concomitant cui-ui recruitment success is attributed to a rise in Pyramid Lake's surface elevation. A decline in lake elevation may lead to a shift in stream morphology and substrate composition to the detriment of cui-ui reproductive success as well as the reproductive success of other native fishes.

  6. Small dams need better management

    Science.gov (United States)

    Balcerak, Ernie

    2012-03-01

    Many small dams around the world are poorly maintained and represent a safety hazard, according to Pisaniello et al. Better oversight of small dams is needed, the authors argue. The researchers reviewed literature, conducted case studies in four states in Australia, and developed policy benchmarks and best practices for small-dam management. Small dams, often just several meters high and typically privately owned by individual farmers, have historically caused major damage when they fail. For instance, in China in 1975, 230,000 people died when two large dams failed because of the cumulative failure of 60 smaller upstream dams. In the United States, in 1977 the 8-meter-high Kelly Barnes Lake dam failed, killing 39 people. Many other small-dam failures around the world have resulted in casualties and severe ecological and economic damage.

  7. Hydrogeology and sources of water to select springs in Black Canyon, south of Hoover Dam, Lake Mead National Recreation Area, Nevada and Arizona

    Science.gov (United States)

    Moran, Michael J.; Wilson, Jon W.; Beard, L. Sue

    2015-11-03

    Springs in Black Canyon of the Colorado River, directly south of Hoover Dam in the Lake Mead National Recreation Area, Nevada and Arizona, are important hydrologic features that support a unique riparian ecosystem including habitat for endangered species. Rapid population growth in areas near and surrounding Black Canyon has caused concern among resource managers that such growth could affect the discharge from these springs. The U.S. Geological Survey studied the springs in Black Canyon between January 2008, and May 2014. The purposes of this study were to provide a baseline of discharge and hydrochemical data from selected springs in Black Canyon and to better understand the sources of water to the springs.

  8. Seismic Monitoring and Characterization of the 2012 Outburst Flood of the Ice-Dammed Lake A.P.Olsen (NE Greenland)

    Science.gov (United States)

    Behm, M.; Walter, J. I.; Binder, D.; Mertl, S.

    2017-12-01

    Since the Zackenberg Research Station (ZRS) in NE-Greenland was established in 1995, regular floods of the adjacent Zackenberg River have been observed. The floods result from the sudden discharge of a marginal, ice-dammed lake at the pre-dominantly cold-based A.P. Olsen Ice Cap about 35 km inland. The lake filling usually starts with the melting season in May/June and ends with the flood sometime after early July. The run-off water from the lake discharges through the subsurface of the adjacent Argo glacier. The actual migration paths and depth of the water within the glacier are unknown until it re-appears at the glacier terminus at a distance of 4 km to the ice-dam. In spring 2012 a surface seismic monitoring network was installed on Argo glacier in 2-3 m boreholes near the lake to acquire continuous data for the whole fill- and drain cycle from start of May to end of November. The network comprises 3 stations with three-component sensors and 2 stations designed as tripartite arrays with vertically oriented sensors. The maximum interstation distance is 1.2 km. Microseismic event detection and localization is facilitated by the homogenous seismic structure of the ice and the extremely high S/N ratio of the borehole installations. An initial detection based on an STA/LTA algorithm and event assocator results in order-of-magnitude 100,000 seismic events. These events are generally attributed to the opening of surface crevasses due to the presence of weak body waves and strong surface wave energy, interpreted to be Rayleigh waves with dominant frequencies around 1-4 Hz. Time-lapse cross-correlations of the ambient seismic noise field reconstruct the surface waves travelling between the stations. Weekly stacks of the cross-correlations are stable, and show a distinct change correlated with the outburst flood. Apparent surface wave velocities increase slightly several weeks prior to the outburst event, which itself is characterized by a decrease in the correlation

  9. The Variation of Several Biological Characteristics of the Chub, Squalius cephalus (L., 1758, in the Orenler Dam Lake, Northwest Anatolia, Turkey

    Directory of Open Access Journals (Sweden)

    Sait BULUT

    2012-08-01

    Full Text Available In the present study, several growth parameters of 338 Squalius cephalus (L., 1758 specimens collected from the Orenler dam lake (Turkey between July 2005 and June 2006 were studied. The population comprised 50.74% males, 46.29% females, and 2.97% males+females. In the examined samples, the age of females and males ranged from I to VII and I to VI, respectively. The fork length and weight of females were 14.7-38.0 cm and 40.68-27.0 g, respectively; these values were 16.3-33.7 cm and 57.7-560.0 g, respectively, for males. The age-length and age-weight relationships at time t were calculated by the von Bertalanffy equation for females, and the following results were obtained: Lt = 37.12[1–e–0.36(t–(–0.96], Wt = 775.6[1–e–0.36(t–(–0.96]3.27, Lt = 43.59[1–e–0.3356(t–(–0.719], and Wt = 1123.2[1–e–0.3356(t–(–0.719]3.08. The calculated length-weight relationship was W = 0.36L3.27 for females and W = 0.03356L3.08 for males. The average condition factor was 1.412 for females and 1.284 for males. Consequently, in the Orenler dam lake, S. cephalus grows very well according to the study’s results.

  10. Estimating accumulation rates and physical properties of sediment behind a dam: Englebright Lake, Yuba River, northern California

    Science.gov (United States)

    Snyder, Noah P.; Rubin, David M.; Alpers, Charles N.; Childs, Jonathan R.; Curtis, Jennifer A.; Flint, Lorraine E.; Wright, Scott A.

    2004-01-01

    Studies of reservoir sedimentation are vital to understanding scientific and management issues related to watershed sediment budgets, depositional processes, reservoir operations, and dam decommissioning. Here we quantify the mass, organic content, and grain-size distribution of a reservoir deposit in northern California by two methods of extrapolating measurements of sediment physical properties from cores to the entire volume of impounded material. Englebright Dam, completed in 1940, is located on the Yuba River in the Sierra Nevada foothills. A research program is underway to assess the feasibility of introducing wild anadromous fish species to the river upstream of the dam. Possible management scenarios include removing or lowering the dam, which could cause downstream transport of stored sediment. In 2001 the volume of sediments deposited behind Englebright Dam occupied 25.5% of the original reservoir capacity. The physical properties of this deposit were calculated using data from a coring campaign that sampled the entire reservoir sediment thickness (6–32 m) at six locations in the downstream ∼3/4 of the reservoir. As a result, the sediment in the downstream part of the reservoir is well characterized, but in the coarse, upstream part of the reservoir, only surficial sediments were sampled, so calculations there are more uncertain. Extrapolation from one-dimensional vertical sections of sediment sampled in cores to entire three-dimensional volumes of the reservoir deposit is accomplished via two methods, using assumptions of variable and constant layer thickness. Overall, the two extrapolation methods yield nearly identical estimates of the mass of the reservoir deposit of ∼26 × 106 metric tons (t) of material, of which 64.7–68.5% is sand and gravel. Over the 61 year reservoir history this corresponds to a maximum basin-wide sediment yield of ∼340 t/km2/yr, assuming no contribution from upstream parts of the watershed impounded by other dams. The

  11. Sociocultural Factors Review for the Warm Springs Dam - Lake Sonoma Project Candidate/Critical Habitat Zone Evaluation,

    Science.gov (United States)

    1983-06-01

    roads which fol- lowed them, were also used by the Cloverdale Porno to gain access to fish- ing sites on Dry Creek, Galloway Creek, and Rail Creek and... Porno , as well as other groups from as far away as Lake County, to reach Annapolis, Stewart’s Point, and Gualala. From Cloverdale, the trail followed...time, the Cloverdale and Dry Creek Porno traveled by buckboard and later by automobile to the coast along a trail which generally follows the route of

  12. Missouri River, Gavins Point Dam - Lewis and Clark Lake, Nebraska and South Dakota, Embankment Criteria and Performance Report.

    Science.gov (United States)

    1982-05-01

    PM T.CTIO. 16 8. DIYISIOU AND CLOSE ib tio/ 17 A iaJ,3,"q1tY Cod,: TC-1 A w!-, iaui’,orI D-I ist SPOIa;I K 9. SEEPAGE CONTROL 18 9.1 Relief Wells 18...DonoeCn vIH & COePS OF ENG11NEERS OMAHA NEFIRASKiA ENIBANKMENT CRITERIA AND PERFORMANCE REPORT P LATE A-2 I< _ I I- / LEWIS A CLARK LAKE Is --- 4"- C

  13. Paleoreconstruction of organic carbon inputs to an oxbow lake in the Mississippi River watershed: Effects of dam construction and land use change on regional inputs

    Science.gov (United States)

    Bianchi, Thomas S.; Galy, Valier; Rosenheim, Brad E.; Shields, Michael; Cui, Xingqian; Van Metre, Peter

    2015-10-01

    We use a dated sediment core from Lake Whittington (USA) in the lower Mississippi River to reconstruct linkages in the carbon cycling and fluvial sediment dynamics over the past 80 years. Organic carbon (OC) sources were characterized using bulk (δ13C, ramped pyrolysis-oxidation (PyrOx) 14C, δ15N, and TN:OC ratios) and compound-specific (lignin phenols and fatty acids, including δ13C and 14C of the fatty acids) analyses. Damming of the Missouri River in the 1950s, other hydrological modifications to the river, and soil conservation measures resulted in reduced net OC export, in spite of increasing OC concentrations. Decreasing δ13C values coincided with increases in δ15N, TN:OC ratios, long-chain fatty acids, and lignin-phenol concentrations, suggesting increased inputs of soil-derived OC dominated by C3 vegetation, mainly resulting from changes in farming practices and crop distribution. However, ramped PyrOx 14C showed no discernible differences downcore in thermochemical stability, indicating a limited impact on soil OC turnover.

  14. Paleoreconstruction of organic carbon inputs to an oxbow lake in the Mississippi River watershed: Effects of dam construction and land use change on regional inputs

    Science.gov (United States)

    Bianchi, Thomas S.; Galy, Valier; Rosenheim, Brad E.; Shields, Michael; Cui, Xingquan; Van Metre, Peter C.

    2015-01-01

    We use a dated sediment core from Lake Whittington (USA) in the lower Mississippi River to reconstruct linkages in the carbon cycling and fluvial sediment dynamics over the past 80 years. Organic carbon (OC) sources were characterized using bulk (δ13C, ramped pyrolysis-oxidation (PyrOx) 14C, δ15N, and TN:OC ratios) and compound-specific (lignin phenols and fatty acids, including δ13C and 14C of the fatty acids) analyses. Damming of the Missouri River in the 1950s, other hydrological modifications to the river, and soil conservation measures resulted in reduced net OC export, in spite of increasing OC concentrations. Decreasing δ13C values coincided with increases in δ15N, TN:OC ratios, long-chain fatty acids, and lignin-phenol concentrations, suggesting increased inputs of soil-derived OC dominated by C3 vegetation, mainly resulting from changes in farming practices and crop distribution. However, ramped PyrOx 14C showed no discernible differences downcore in thermochemical stability, indicating a limited impact on soil OC turnover.

  15. Hydrology and model of North Fork Solomon River Valley, Kirwin Dam to Waconda Lake, north-central Kansas

    Science.gov (United States)

    Jorgensen, Donald G.; Stullken, Lloyd E.

    1981-01-01

    The alluvial valley of the North Fork Solomon River is an important agricultural area. Reservoir releases diverted below Kirwin Dam are the principal source of irrigation water. During the 1970'S, severe water shortages occurred in Kirwin Reservoir and other nearby reservoirs as a result of an extended drought. Some evidence indicates that surface-water shortages may have been the result of a change in the rainfall-runoff relationship. Examination of the rainfall-runoff relationship shows no apparent trend from 1951 to 1968, but annual records from 1969 to 1976 indicate that deficient rainfall occurred during 6 of the 8 years. Ground water from the alluvial aquifer underlying the river valley also is used extensively for irrigation. Utilization of ground water for irrigation greatly increased from about 200 acre-feet in 1955 to about 12,300 acre-feet in 1976. Part of the surface water diverted for irrigation has percolated downward into the aquifer raising the ground-water level. Ground-water storage in the aquifer increased from 230,000 acre-feet in 1946 to 275,000 acre-feet in 1976-77. A digital model was used to simulate the steady-state conditions in the aquifer prior to closure of Kirwin Dam. Model results indicated that precipitation was the major source of recharge to the aquifer. The effective recharge, or gain from precipitation minus evapotranspiration, was about 11,700 acre-feet per year. The major element of discharge from the aquifer was leakage to the river. The simulated net leakage (leakage to the river minus leakage from the river) was about 11,500 acre-feet per year. The simulated value is consistent with the estimated gain in base flow of the river within the area modeled. Measurements of seepage used to determine gain and loss to the stream were made twice during 1976. Based on these measurements and on base-flow periods identified from hydrographs, it was estimated that the ground-water discharge to the stream has increased about 4,000 acre

  16. Artificial dam lakes as suitable habitats for exotic invertebrates: Ostracoda ecology and distribution in reservoirs of the Eastern Iberian Peninsula

    Directory of Open Access Journals (Sweden)

    Escrivà A.

    2014-01-01

    Full Text Available Reservoirs are the most common deep lakes in Spain, as a consequence of water needs and dry climate. Although these aquatic systems can play an important ecological role in such an area with few large natural lakes, they can also provide new habitats for exotic species, which can colonize ecosystems that native species have not explored yet. Here we present our results for a biannual survey of the ostracod fauna from 24 reservoirs in Xúquer River basin. We check which variables affect ostracod presence, test for differences between winter and summer assemblages, and compare our data with previous available ostracod records from the same river drainage network. Our results reveal that ostracod presence is positively related to high diversity of the invertebrate community and reservoir volume, and negatively with phosphorus concentration. Among the 22 species found, it is noteworthy the first Iberian record of Ilyocypris getica and the second European record of Candonocypris novaezelandiae. Ostracod assemblages significantly vary between summer and winter, and strong differences are found between ostracod communities of reservoirs and those from their connected rivers. Remarkably higher frequency of exotic species in the reservoirs confirms previous findings about the facilitation that artificial ecosystems confer to aquatic invasions.

  17. Using geophysics on a terminal moraine damming a glacial lake: the Flatbre debris flow case, Western Norway

    Directory of Open Access Journals (Sweden)

    I. Lecomte

    2008-04-01

    Full Text Available A debris flow occurred on 8 May 2004, in Fjǽrland, Western Norway, due to a Glacial Lake Outburst Flood and a natural terminal moraine failure. The site was investigated in 2004 and 2005, using pre- and post-flow aerial photos, airborne laser scanning, and extensive field work investigations, resulting in a good understanding of the mechanics of the debris flow, with quantification of the entrainment and determination of the final volume involved. However, though the moraine had a clear weak point, with lower elevation and erosion due to overflowing in the melting season, the sudden rupture of the moraine still needs to be explained. As moraines often contain an ice core, a possible cause could be the melting of the ice, inducing a progressive weakening of the structure. Geophysical investigations were therefore carried out in September 2006, including seismic refraction, GPR and resistivity. All methods worked well, but none revealed the presence of ice, though the depth to bedrock was determined. On the contrary, the moraine appeared to be highly saturated in water, especially in one area, away from the actual breach and corresponding to observed water seepage at the foot of the moraine. To estimate future hazard, water circulation through the moraine should be monitored over time.

  18. Three Gorges Dam: Impact of Water Level Changes on the Density of Schistosome-Transmitting Snail Oncomelania hupensis in Dongting Lake Area, China.

    Directory of Open Access Journals (Sweden)

    Jin-Yi Wu

    Full Text Available Schistosomiasis remains an important public health issue in China and worldwide. Oncomelania hupensis is the unique intermediate host of schistosoma japonicum, and its change influences the distribution of S. japonica. The Three Gorges Dam (TGD has substantially changed the ecology and environment in the Dongting Lake region. This study investigated the impact of water level and elevation on the survival and habitat of the snails.Data were collected for 16 bottomlands around 4 hydrological stations, which included water, density of living snails (form the Anxiang Station for Schistosomiasis Control and elevation (from Google Earth. Based on the elevation, sixteen bottomlands were divided into 3 groups. ARIMA models were built to predict the density of living snails in different elevation areas.Before closure of TGD, 7 out of 9 years had a water level beyond the warning level at least once at Anxiang hydrological station, compared with only 3 out of 10 years after closure of TGD. There were two severe droughts that happened in 2006 and 2011, with much fewer number of flooding per year compared with other study years. Overall, there was a correlation between water level changing and density of living snails variation in all the elevations areas. The density of living snails in all elevations areas was decreasing after the TGD was built. The relationship between number of flooding per year and the density of living snails was more pronounced in the medium and high elevation areas; the density of living snails kept decreasing from 2003 to 2014. In low elevation area however, the density of living snails decreased after 2003 first and turned to increase after 2011. Our ARIMA prediction models indicated that the snails would not disappear in the Dongting Lake region in the next 7 years. In the low elevation area, the density of living snails would increase slightly, and then stabilize after the year 2017. In the medium elevation region, the change of

  19. Brief communication: The Khurdopin glacier surge revisited – extreme flow velocities and formation of a dammed lake in 2017

    Directory of Open Access Journals (Sweden)

    J. F. Steiner

    2018-01-01

    Full Text Available Glacier surges occur regularly in the Karakoram, but the driving mechanisms, their frequency and its relation to a changing climate remain unclear. In this study, we use digital elevation models and Landsat imagery in combination with high-resolution imagery from the Planet satellite constellation to quantify surface elevation changes and flow velocities during a glacier surge of the Khurdopin Glacier in 2017. Results reveal that an accumulation of ice volume above a clearly defined steep section of the glacier tongue since the last surge in 1999 eventually led to a rapid surge in May 2017 peaking with velocities above 5000 m a−1, which were among the fastest rates globally for a mountain glacier. Our data reveal that velocities on the lower tongue increase steadily during a 4-year build-up phase prior to the actual surge only to then rapidly peak and decrease again within a few months, which confirms earlier observations with a higher frequency of available velocity data. The surge return period between the reported surges remains relatively constant at ca. 20 years. We show the potential of a combination of repeat Planet and ASTER imagery to (a capture peak surge velocities that are easily missed by less frequent Landsat imagery, (b observe surface changes that indicate potential drivers of a surge and (c monitor hazards associated with a surge. At Khurdopin specifically, we observe that the surging glacier blocks the river in the valley and causes a lake to form, which may grow in subsequent years and could pose threats to downstream settlements and infrastructure in the case of a sudden breach.

  20. Brief communication: The Khurdopin glacier surge revisited - extreme flow velocities and formation of a dammed lake in 2017

    Science.gov (United States)

    Steiner, Jakob F.; Kraaijenbrink, Philip D. A.; Jiduc, Sergiu G.; Immerzeel, Walter W.

    2018-01-01

    Glacier surges occur regularly in the Karakoram, but the driving mechanisms, their frequency and its relation to a changing climate remain unclear. In this study, we use digital elevation models and Landsat imagery in combination with high-resolution imagery from the Planet satellite constellation to quantify surface elevation changes and flow velocities during a glacier surge of the Khurdopin Glacier in 2017. Results reveal that an accumulation of ice volume above a clearly defined steep section of the glacier tongue since the last surge in 1999 eventually led to a rapid surge in May 2017 peaking with velocities above 5000 m a-1, which were among the fastest rates globally for a mountain glacier. Our data reveal that velocities on the lower tongue increase steadily during a 4-year build-up phase prior to the actual surge only to then rapidly peak and decrease again within a few months, which confirms earlier observations with a higher frequency of available velocity data. The surge return period between the reported surges remains relatively constant at ca. 20 years. We show the potential of a combination of repeat Planet and ASTER imagery to (a) capture peak surge velocities that are easily missed by less frequent Landsat imagery, (b) observe surface changes that indicate potential drivers of a surge and (c) monitor hazards associated with a surge. At Khurdopin specifically, we observe that the surging glacier blocks the river in the valley and causes a lake to form, which may grow in subsequent years and could pose threats to downstream settlements and infrastructure in the case of a sudden breach.

  1. National Program for Inspection of Non-Federal Dams. Lake Franklin Pierce Dam (NH 00199), NHWRB-116.04, Merrimack River Basin, Hillsboro, New Hampshire. Phase I Inspection Report.

    Science.gov (United States)

    1978-08-01

    ATTENTION OF: NEDED-~EAR1817*V Honorable Hugh J. Gallen ... Governor of the State of New Hampshire , State House Concord, New Hampshire 03301 Dear...8217.. . , , .. .. , .. . . . - :o , ... . ?....* -. , _ _ :, . ,,. ., Q ,; ,-. t,’. ,. NEDED-E Honorable Hugh J. Gallen It is recommended that within twelve...7.5 ft. diameter penstock runs downstream from the dam a distance of 1.3 miles to the Jackman Hydroelectric ..* *. Station. The dam is owned by the

  2. Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam safety management into the next millenium; 6 - rehabilitation techniques: the unconventional application of conventional materials; nondestructive testing technology to characterize concrete dam/bedrock interface; method and instrument for detecting crack in concrete; and grouting of the cracks in the Arch 5-6 - Daniel Johnson Dam; and 7 - case studies: rehabilitation of an 80 year old Ambursen type dam; and debris booms for the protection of spillways.

  3. Flood-inundation maps for the Saluda River from Old Easley Bridge Road to Saluda Lake Dam near Greenville, South Carolina

    Science.gov (United States)

    Benedict, Stephen T.; Caldwell, Andral W.; Clark, Jimmy M.

    2013-01-01

    Digital flood-inundation maps for a 3.95-mile reach of the Saluda River from approximately 815 feet downstream from Old Easley Bridge Road to approximately 150 feet downstream from Saluda Lake Dam near Greenville, South Carolina, were developed by the U.S. Geological Survey (USGS). The inundation maps, which can be accessed through the USGS Flood Inundation Mapping Science Web site at http://water.usgs.gov/osw/flood_inundation/, depict estimates of the areal extent and depth of flooding corresponding to selected water levels (stages) at the USGS streamgage at Saluda River near Greenville, South Carolina (station 02162500). Current conditions at the USGS streamgage may be obtained through the National Water Information System Web site at http://waterdata.usgs.gov/sc/nwis/uv/?site_no=02162500&PARAmeter_cd=00065,00060,00062. The National Weather Service (NWS) forecasts flood hydrographs at many places that are often collocated with USGS streamgages. Forecasted peak-stage information is available on the Internet at the NWS Advanced Hydrologic Prediction Service (AHPS) flood-warning system Web site (http://water.weather.gov/ahps/) and may be used in conjunction with the maps developed in this study to show predicted areas of flood inundation.In this study, flood profiles were computed for the stream reach by means of a one-dimensional step-backwater model. The model was calibrated using the most current stage-streamflow relations at USGS streamgage station 02162500, Saluda River near Greenville, South Carolina. The hydraulic model was then used to determine water-surface profiles for flood stages at 1.0-foot intervals referenced to the streamgage datum and ranging from approximately bankfull to 2 feet higher than the highest recorded water level at the streamgage. The simulated water-surface profiles were then exported to a geographic information system, ArcGIS, and combined with a digital elevation model (derived from Light Detection and Ranging [LiDAR] data with a 0

  4. Historical variations in the stable isotope composition of mercury in a sediment core from a riverine lake: Effects of dams, pulp and paper mill wastes, and mercury from a chlor-alkali plant

    International Nuclear Information System (INIS)

    Jackson, Togwell A.

    2016-01-01

    The Wabigoon River (Ontario, Canada) was affected by dams starting in 1898 and was polluted with pulp and paper mill wastes starting in 1913 and mercury from a chlor-alkali plant from 1962 to 1975. A dated sediment core from a riverine lake was analysed to investigate resultant changes in the biogeochemistry of mercury as revealed by variations in mercury isotope ratios and sediment chemistry. A total mercury maximum formed by the mercury pollution coincided with minimums in the δ-values of the 198 Hg/ 202 Hg, 199 Hg/ 202 Hg, 200 Hg/ 202 Hg, and 201 Hg/ 202 Hg ratios, and the δ-values decreased in the order δ 201 Hg > δ 200 Hg > δ 199 Hg > δ 198 Hg. Thus, mass-dependent fractionation caused depletion in lighter isotopes, implying evaporation of Hg(0) and pollution of the atmosphere as well as the river-lake system. Concurrently, mass-independent fractionation caused 199 Hg enrichment, possibly reflecting an independently documented upsurge in methylmercury production, and 201 Hg depletion, suggesting removal of methylmercury with anomalously high 201 Hg/ 199 Hg ratios by aquatic organisms and accumulation of 201 Hg-depleted inorganic Hg(II) in sediments. The δ 201 Hg/δ 199 Hg ratio rose abruptly when mercury pollution began, reflecting the resultant increase in methylmercury production, and remained high but gradually declined as the pollution abated, paralleling trends shown by methylmercury in aquatic organisms. The δ 201 Hg/δ 199 Hg ratio of pre-1962 background mercury increased ca. 1898 and ca. 1913–1929, suggesting accelerated methylmercury production due to stimulation of microbial activities by the damming of the river and the input of pulp and paper mill wastes, respectively. Other variations were linked to economic and technological factors that affected pulp and paper manufacture. - Highlights: • A core from a lake polluted by Hg and organic wastes was analysed for Hg isotopes. • Hg from a chlor-alkali plant was depleted in lighter

  5. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced

  6. Garrison Dam/Lake Sakakawea Project, North Dakota Surplus Water Report. Volume 2. Appendix B - Public and Agency Coordination and Letters / Views of Federal, State, and Local Interests

    Science.gov (United States)

    2011-03-01

    need treated water. The Missouri River water we have now is capable of doing all the hydraulic fracking that we need to do. So in closure it is...2010, Analysis of Hydraulic Impacts for Lake Sakakawea Withdrawals, November 16,2010, and electronic copies ofthe DRM output files (e.g. Q2D, Q1D...requested a copy of the reference cited in the Environmental Assessment: AECOM 2010, Analysis of Hydraulic Impacts for Lake Sakakawea Withdrawals, November

  7. Borehole geophysical and flowmeter data for eight boreholes in the vicinity of Jim Woodruff Lock and Dam, Lake Seminole, Jackson County, Florida

    Science.gov (United States)

    Clarke, John S.; Hamrick, Michael D.; Holloway, O. Gary

    2011-01-01

    Borehole geophysical logs and flowmeter data were collected in April 2011 from eight boreholes to identify the depth and orientation of cavernous zones within the Miocene Tampa Limestone in the vicinity of Jim Woodruff Lock and Dam in Jackson County, Florida. These data are used to assess leakage near the dam. Each of the eight boreholes was terminated in limestone at depths ranging from 84 to 104 feet. Large cavernous zones were encountered in most of the borings, with several exceeding 20-inches in diameter. The cavernous zones generally were between 1 and 5 feet in height, but a cavern in one of the borings reached a height of about 6 feet. The resistivity of limestone layers penetrated by the boreholes generally was less than 1,000 ohm-meters. Formation resistivity near the cavernous zones did not show an appreciable contrast from surrounding bedrock, probably because the bedrock is saturated, owing to its primary permeability. Measured flow rates in the eight boreholes determined using an electromagnetic flowmeter were all less than ±0.1 liter per second. These low flow rates suggest that vertical hydraulic gradients in the boreholes are negligible and that hydraulic head in the various cavernous zones shows only minor, if any, variation.

  8. NRC inventory of dams

    International Nuclear Information System (INIS)

    Lear, G.E.; Thompson, O.O.

    1983-01-01

    The NRC Inventory of Dams has been prepared as required by the charter of the NRC Dam Safety Officer. The inventory lists 51 dams associated with nuclear power plant sites and 14 uranium mill tailings dams (licensed by NRC) in the US as of February 1, 1982. Of the 85 listed nuclear power plants (148 units), 26 plants obtain cooling water from impoundments formed by dams. The 51 dams associated with the plants are: located on a plant site (29 dams at 15 plant sites); located off site but provide plant cooling water (18 dams at 11 additional plant sites); and located upstream from a plant (4 dams) - they have been identified as dams whose failure, and ensuing plant flooding, could result in a radiological risk to the public health and safety. The dams that might be considered NRC's responsibility in terms of the federal dam safety program are identified. This group of dams (20 on nuclear power plant sites and 14 uranium mill tailings dams) was obtained by eliminating dams that do not pose a flooding hazard (e.g., submerged dams) and dams that are regulated by another federal agency. The report includes the principal design features of all dams and related useful information

  9. Letna Dinamika Pojavljanja Vodnih Ptic Na Reki Dravi Med Mariborskim Jezerom In Jezom Melje (Sv Slovenija / Yearly dynamics of waterbirds’ occurrence on the Drava River between Lake Maribor and Melje Dam (NE Slovenia

    Directory of Open Access Journals (Sweden)

    Logar Katja

    2014-11-01

    Full Text Available Between April 2007 and April 2008, 40 systematic waterbird counts were conducted on the Drava River between Lake Maribor and the Melje Dam (length 8.5 km, area 155 ha to determine the specific composition, abundance and seasonal dynamics of bird occurrence. Between October and May, counts were conducted every week, whereas between June and September they were carried out once every two weeks. In total, 26,803 individuals of 30 species were counted. The number of waterbirds and diversity of species were the highest from late December to late February, when more than 1,000 individuals were regularly present in the area. Waterbirds were distributed along the river unequally, with the highest number of birds present yearround in the city centre and in the first counting sector of Lake Maribor. The Mallard Anas platyrhynchos and Mute Swan Cygnus olor were recorded during every count, while occurrence frequency was greater than 50% in another 10 species. Dominant species in terms of percentage composition were Mallard, Black-headed Gull Chroicocephalus ridibundus, Coot Fulica atra, Mute Swan, Pochard Aythya ferina and Tufted Duck Ay. fuligula. Mute Swan and Mallard were the only breeding waterbirds in the study area. Both the total number of waterbirds and the highest daily total in the first two counting sectors were greater between October and March 1992/93 than in our study. The decline in numbers was the greatest for Mallard, Pochard and Tufted Duck, while an increase was noted in Mute Swan and Yellow-legged / Caspian Gull Larus michahellis / cachinnans. The total number of waterbirds and the number of some species in the study area were significantly higher than expected solely based on its length compared to the length of the lowland Drava in Slovenia (125.7 km. The study area is conservationally important for Pochard, Tufted Duck and Black-headed Gull

  10. Private investment for building a small hydropower plant at Zetea dam base

    International Nuclear Information System (INIS)

    Popa, Florica; Paraschivescu, Adina; Vladescu, Aurelia; Popa, Bogdan

    2007-01-01

    Zetea lake grading project comprises an earthen dam, made out of local materials, having as main purposes water supply, flood control and protection against flooding. The paper analyzes the possibility of building a small hydropower plant at the base of the dam, using private investment resources, in order to put to good use the water flow evacuated from the storage lake. (authors)

  11. Submerged Grove in Lake Onogawa

    OpenAIRE

    Sato, Yasuhiro; Nakamura, Soken; Ochiai, Masahiro

    1996-01-01

    Abstract : The first record by ultrasonic echo sounding on the distribution of the submerged standing trees on the bottom of Lake Onogawa is presented. Lake Onogawa is a dammed lake formed at the time of the eruption of the volcano Mt.Bandai in 1888. Since then the original vegetation of the dammed valley has remained submerged. Many submerged standing trees are distributed on the bottom within about 600m from the northeast end of the lake. The density of the trees in this area is sufficient ...

  12. Fe, Mn, P and S speciation in sediments from the Capivara Hydroelectric Dam Lake (Brazil) as an indicator of anthropogenic influences

    Energy Technology Data Exchange (ETDEWEB)

    Ishikawa, Dilson Norio [Department of Chemistry, CCE, Londrina State University, Londrina, Parana (Brazil); Spacino Scarminio, Ieda [Laboratory of Chemometrics in Natural Sciences, Department of Chemistry, CCE, Londrina State University, Londrina, Parana (Brazil); Souza Costa, Joao de; Santos Nora, Paulo dos; Fatima Soares, Miriam de; Mansano Nicolau, Romilaine; Esteves Goncalves, Adriana Celeste; Giancoli Barreto, Sonia Regina [Laboratory of Environmental Physical Chemistry, Department of Chemistry, CCE, Londrina State University, Londrina, Parana (Brazil); Barreto, Wagner Jose

    2008-04-15

    The conservation of large water resources is essential for the preservation of human life. The quantification and, more importantly, the speciation of chemical substances that indicate the presence of anthropogenic contamination in water resources are of great importance. This paper presents the results of analysis for the determination of organic, inorganic and total phosphorus, pseudo-sulfur, and iron and manganese, in five fractions, in water sediments collected from the Capivara Hydroelectric Power Plant, Brazil. A study on the seasonal variation of these parameters was conducted, with data having been collected in the winter and in the summer, at two sites along the dam, 5 km apart, close to the city of Primeiro de Maio. Phosphorous was found in sediments and adjacent soil in the organic form (OP), and was used as an indicator of anthropogenic influence on the reservoir banks. Speciation of potentially toxic Mn showed that it is present in the exchangeable fraction of the 0-5 cm depth layer (sediment/water interface), making its transfer to the water column possible. Results from this study showed that domestic and industrial effluent treatment measures are needed for the preservation of the quality of aquatic environments. (Abstract Copyright [2008], Wiley Periodicals, Inc.)

  13. Evaluation of SEBS, SEBAL, and METRIC models in estimation of the evaporation from the freshwater lakes (Case study: Amirkabir dam, Iran)

    Science.gov (United States)

    Zamani Losgedaragh, Saeideh; Rahimzadegan, Majid

    2018-06-01

    Evapotranspiration (ET) estimation is of great importance due to its key role in water resource management. Surface energy modeling tools such as Surface Energy Balance Algorithm for Land (SEBAL), Mapping Evapotranspiration with Internalized Calibration (METRIC), and the Surface Energy Balance System (SEBS) can estimate the amount of evapotranspiration for every pixel of the satellite images. The main objective of this research is evaporation investigation from the freshwater bodies using SEBAL, METRIC, and SEBS. For this purpose, the Amirkabir dam reservoir and its nearby agricultural lands in a semi-arid climate were selected and studied from 2011 to 2017 as the study area. The implementations of this study were accomplished on 16 satellite images of Landsat TM5 and OLI. Then, SEBAL, METRIC, and SEBS were implemented on the selected images. Moreover, the corresponding pan evaporate measurements on the reservoir bank were considered as the ground truth data. Regarding to the results, SEBAL is not a reliable method to evaluate freshwater evaporation with the coefficient of determination (R2) of 0.36 and the Root Mean Square Error (RMSE) of 5.1 mm. On the other hand, METRIC with RMSE and R2 of 0.57 and 2.02 mm and SEBS with RMSE and R2 of 0.93 and 0.62 demonstrated a relatively good performance.

  14. Alpine dams

    Directory of Open Access Journals (Sweden)

    Alain Marnezy

    2009-03-01

    Full Text Available Les barrages-réservoirs de montagne ont été réalisés initialement dans les Alpes pour répondre à la demande d’énergie en période hivernale. Une certaine diversification des usages de l’eau s’est ensuite progressivement développée, en relation avec le développement touristique des collectivités locales. Aujourd’hui, la participation des ouvrages d’Électricité De France à la production de neige de culture représente une nouvelle étape. Dans les régions où les aménagements hydroélectriques sont nombreux, les besoins en eau pour la production de neige peuvent être résolus par prélèvements à partir des adductions EDF. Les gestionnaires de stations échappent ainsi aux inconvénients liés à la construction et à la gestion des « retenues collinaires ». Cette évolution, qui concerne déjà quelques régions alpines comme la haute Maurienne ou le Beaufortin, apparaît comme une forme renouvelée d’intégration territoriale de la ressource en eau.Mountain reservoirs were initially built in the Alps to meet energy needs in the winter. A certain diversification in the uses of water then gradually developed, related to tourism development in the local communities. Today, the use of facilities belonging to EDF (French Electricity Authority to provide water for winter resorts to make artificial snow represents a new phase. By taking water from EDF resources to supply snow-making equipment, resort managers are thus able to avoid the problems related to the construction and management of small headwater dams. This new orientation in the use of mountain water resources already affects a number of alpine regions such as the Upper Maurienne valley and Beaufortain massif and represents a renewed form of the territorial integration of water resources.

  15. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  16. DAM-LAKEFRONT PLAZA: Revitalization of an Agriculture Reservoir Dam in Kashar-Tirana/Albania

    Directory of Open Access Journals (Sweden)

    Valbona Koçi

    2014-12-01

    Full Text Available The Dam-Lakefront Plaza in Kashar-Tirana/Albania is a research project that proposes not only the re-consideration and reinforcement of the artificial Reservoirs Dams built during Socialism in Albania, but envisions the maintenance of dams and revitalization of the lakeside area promoting the public-private collaboration. In addition, it envisions the generation of qualitative and lively public spaces in sub-urban areas as well. Admitting the artificial lakes as specific nodes of man-made infrastructure in the landscape, and consequently the dams (together with the drainage channels as important hydrotechnic elements of the flood protection infrastructure, this research intends to elaborate on one type of landscape infrastructure - the vertical screens, offering a mediation between the natural and built landscape.

  17. Water quality of Lake Austin and Town Lake, Austin, Texas

    Science.gov (United States)

    Andrews, Freeman L.; Wells, Frank C.; Shelby, Wanda J.; McPherson, Emma

    1988-01-01

    Lake Austin and Town Lake are located on the Colorado River in Travis County, central Texas, and serve as a source of water for municipal and industrial water supplies, electrical-power generation, and recreation for more than 500,000 people in the Austin metropolitan area. Lake Austin, located immediately downstream of Lake Travis, extends for more than 20 miles into the western edge of the city of Austin. Town Lake extends through the downtown area of the city of Austin for nearly 6 miles where the Colorado River is impounded by Longhorn Dam.

  18. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  19. Dams designed to fail

    Energy Technology Data Exchange (ETDEWEB)

    Penman, A. [Geotechnical Engineering Consultants, Harpenden (United Kingdom)

    2004-09-01

    New developments in geotechnical engineering have led to methods for designing and constructing safe embankment dams. Failed dams can be categorized as those designed to fail, and those that have failed unexpectedly. This presentation outlined 3 dam failures: the 61 m high Malpasset Dam in France in 1959 which killed 421; the 71 m high Baldwin Hills Dam in the United States in 1963 which killed 5; and, the Vajont Dam in Italy in 1963 which killed 2,600 people. Following these incidents, the International Commission for Large Dams (ICOLD) reviewed regulations on reservoir safety. The 3 dams were found to have inadequate spillways and their failures were due to faults in their design. Fuse plug spillways, which address this problem, are designed to fail if an existing spillway proves inadequate. They allow additional discharge to prevent overtopping of the embankment dam. This solution can only be used if there is an adjacent valley to take the additional discharge. Examples of fuse gates were presented along with their effect on dam safety. A research program is currently underway in Norway in which high embankment dams are being studied for overtopping failure and failure due to internal erosion. Internal erosion has been the main reason why dams have failed unexpectedly. To prevent failures, designers suggested the use of a clay blanket placed under the upstream shoulder. However, for dams with soft clay cores, these underblankets could provide a route for a slip surface and that could lead to failure of the upstream shoulder. It was concluded that a safe arrangement for embankment dams includes the use of tipping gates or overturning gates which always fail at a required flood water level. Many have been installed in old and new dams around the world. 14 refs., 19 figs.

  20. Mechanics of slide dams

    International Nuclear Information System (INIS)

    Young, G.A.

    1970-01-01

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  1. Mechanics of slide dams

    Energy Technology Data Exchange (ETDEWEB)

    Young, G A [Engineering, Agbabian-Jacobsen Associates, Los Angeles (United States)

    1970-05-15

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  2. Tailings dams from the perspective of conventional dam engineering

    International Nuclear Information System (INIS)

    Szymanski, M.B.

    1999-01-01

    A guideline intended for conventional dams such as hydroelectric, water supply, flood control, or irrigation is used sometimes for evaluating the safety of a tailings dam. Differences between tailings dams and conventional dams are often substantial and, as such, should not be overlooked when applying the techniques or safety requirements of conventional dam engineering to tailings dams. Having a dam safety evaluation program developed specifically for tailings dams is essential, if only to reduce the chance of potential errors or omissions that might occur when relying on conventional dam engineering practice. This is not to deny the merits of using the Canadian Dam Safety Association Guidelines (CDSA) and similar conventional dam guidelines for evaluating the safety of tailings dams. Rather it is intended as a warning, and as a rationale underlying basic requirement of tailings dam emgineering: specific experience in tailings dams is essential when applying conventional dam engineering practice. A discussion is included that focuses on the more remarkable tailings dam safety practics. It is not addressed to a technical publications intended for such dams, or significantly different so that the use of conventional dam engineering practice would not be appropriate. The CDSA Guidelines were recently revised to include tailings dams. But incorporating tailings dams into the 1999 revision of the CDSA Guidelines is a first step only - further revision is necessary with respect to tailings dams. 11 refs., 2 tabs

  3. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  4. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H. [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  5. Estimates o the risks associated with dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Ayyaswamy, P.; Hauss, B.; Hseih, T.; Moscati, A.; Hicks, T.E.; Okrent, D.

    1974-03-01

    The probabilities and potential consequences of dam failure in California, primarily due to large earthquakes, was estimated, taking as examples eleven dams having a relatively large population downstream. Mortalities in the event of dam failure range from 11,000 to 260,000, while damage to property may be as high as $720 million. It was assumed that an intensity IX or X earthquake (on the Modified Mercalli Scale) would be sufficient to completely fail earthen dams. Predictions of dam failure were based on the recurrence times of such earthquakes. For the dams studied, the recurrence intervals for an intensity IX earthquake varied between 20 and 800 years; for an intensity X between 50 and 30,000 years. For the Lake Chabot and San Pablo dams (respectively 20, 30 years recurrent earthquake times for a intensity X) the associated consequences are: 34,000 (Lake Chabot) and 30,000 (San Pablo) people killed; damage $140 million and $77 million. Evaculation was found to ameliorate the consequences slightly in most cases because of the short time available. Calculations are based on demography, and assume 10 foot floodwaters will drown all in their path and destroy all one-unit homes in the flood area. Damage estimates reflect losses incurred by structural damage to buildings and do not include loss of income. Hence the economic impact is probably understated.

  6. Characterization of landslide dams in the San Juan province (Argentina)

    Science.gov (United States)

    Penna, Ivanna; Longchamp, Celine; Derron, Marc-Henri; Jaboyedoff, Michel

    2013-04-01

    lasting for millennia can collapse suddenly due to anomalous weather conditions, and unstable dams can have a higher longevity depending on the season controlling the inflow into the lake.

  7. Dams release methane even in temperate zoned

    International Nuclear Information System (INIS)

    Lemarchand, F.

    2010-01-01

    The Wohlen lake (near Bern) is a retaining dam built 90 years ago that has undergone a campaign to measure the quantity of methane released. The campaign lasted 1 year and the result was unexpected: 0.15 g/m 2 *day which one of the highest release rates in temperate zones. This result is all the more stunning since water stays only 2 days in average in the reservoir and that the drowned area is not important. In fact the river Aar that feeds the lake is loaded with organic matter coming from humane activities: agriculture and 3 sewage plants. This organic matter decays in the lake releasing methane. (A.C.)

  8. Earthquake Hazard for Aswan High Dam Area

    Science.gov (United States)

    Ismail, Awad

    2016-04-01

    Earthquake activity and seismic hazard analysis are important components of the seismic aspects for very essential structures such as major dams. The Aswan High Dam (AHD) created the second man-made reservoir in the world (Lake Nasser) and is constructed near urban areas pose a high-risk potential for downstream life and property. The Dam area is one of the seismically active regions in Egypt and is occupied with several cross faults, which are dominant in the east-west and north-south. Epicenters were found to cluster around active faults in the northern part of Lake and AHD location. The space-time distribution and the relation of the seismicity with the lake water level fluctuations were studied. The Aswan seismicity separates into shallow and deep seismic zones, between 0 and 14 and 14 and 30 km, respectively. These two seismic zones behave differently over time, as indicated by the seismicity rate, lateral extent, b-value, and spatial clustering. It is characterized by earthquake swarm sequences showing activation of the clustering-events over time and space. The effect of the North African drought (1982 to present) is clearly seen in the reservoir water level. As it decreased and left the most active fault segments uncovered, the shallow activity was found to be more sensitive to rapid discharging than to the filling. This study indicates that geology, topography, lineations in seismicity, offsets in the faults, changes in fault trends and focal mechanisms are closely related. No relation was found between earthquake activity and both-ground water table fluctuations and water temperatures measured in wells located around the Kalabsha area. The peak ground acceleration is estimated in the dam site based on strong ground motion simulation. This seismic hazard analyses have indicated that AHD is stable with the present seismicity. The earthquake epicenters have recently took place approximately 5 km west of the AHD structure. This suggests that AHD dam must be

  9. Natural radioactivity levels in lake sediment samples

    International Nuclear Information System (INIS)

    Eroglu, H.; Kabadayi, O.

    2013-01-01

    The radioactivity concentrations of nuclides 238 U, 232 Th and 40 K in lake sediments collected from 15 different stations at Altinkaya dam lake and 12 different stations at Derbent dam lake in Turkey were measured using high-resolution gamma-ray spectrometry. The measurement was done using a coaxial HPGe detector system coupled to the Ortec-Dspect jr digital MCA system. The average measured activity concentrations of the nuclides 238 U, 232 Th and 40 K were found to be 19.5, 27.7 and 460 Bq kg -1 in Altinkaya dam, whereas the activity concentrations were 18.8, 25.5 and 365 Bq kg -1 in Derbent dam, respectively. The measured activity concentrations in the present study have been compared with similar measurements from different locations in the world. (authors)

  10. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    Elsayed, E.; Leung, T.; Kirkham, A.; Lum, D.

    1990-01-01

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  11. Resilience scales of a dammed tropical river

    Science.gov (United States)

    Calamita, Elisa; Schmid, Martin; Wehrli, Bernhard

    2017-04-01

    Artificial river impoundments disrupt the seasonality and dynamics of thermal, chemical, morphological and ecological regimes in river systems. These alterations affect the aquatic ecosystems in space and time and specifically modify the seasonality and the longitudinal gradients of important biogeochemical processes. Resilience of river systems to anthropogenic stressors enables their recovery along the flow path; however little is known about the longitudinal distance that rivers need to partially restore their physical, chemical and biological integrity. In this study, the concept of a "resilience scale" will be explored for different water quality parameters downstream of Kariba dam, the largest artificial lake in the Zambezi basin (South-East Africa). The goal of this project is to develop a modelling framework to investigate and quantify the impact of large dams on downstream water quality in tropical context. In particular, we aim to assess the degree of reversibility of the main downstream alterations (temperature, oxygen, nutrients) and consequently the quantification of their longitudinal extent. Coupling in-situ measurements with hydraulic and hydrological parameters such as travel times, will allow us to define a physically-based parametrization of the different resilience scales for tropical rivers. The results will be used for improving future dam management at the local scale and assessing the ecological impact of planned dams at the catchment scale.

  12. Calculating earth dam seepage using HYDRUS software applications

    Directory of Open Access Journals (Sweden)

    Jakub Nieć

    2017-06-01

    Full Text Available This paper presents simulations of water seepage within and under the embankment dam of Lake Kowalskie reservoir. The aim of the study was to compare seepage calculation results obtained using analytical and numerical methods. In April 1985, after the first filling of the reservoir to normal storage levels, water leaks was observed at the base of the escarpment, on the air side of the dam. In order to control seepage flow, drainage was performed and additional piezometers installed. To explain the causes of increased pressure in the aquifer under the dam in May 1985 a simplified calculation of filtration was performed. Now, on the basis of archived data from the Department of Hydraulic and Sanitary Engineering using 3D HYDRUS STANDARD software, the conditions of seepage under the dam have been recreated and re-calculated. Piezometric pressure was investigated in three variants of drainage, including drainage before and after modernization.

  13. Allegheny County Dam Locations

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset shows the point locations of dams in Allegheny County. If viewing this description on the Western Pennsylvania Regional Data Center’s open data portal...

  14. A review of the effects of dams on the hydrology, water quality and ...

    African Journals Online (AJOL)

    In this paper, the effects of dams on the hydrology, water quality and invertebrate fauna of some Nigerian inland waters were reviewed. The freshwaters considered include Awba Reservoir (Oyo State), Shiroro Lake (Kaduna State), Moro Lake (Kwara State), Aiba Reservoir (Osun State), Ikpoba Reservoir (Edo State), Onah ...

  15. Teton Dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Snorteland, N. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case summary discussed an internal erosion failure that occurred at the embankment foundation of Teton Dam. The project was designed as a run-of-the-river power generation facility and to provide irrigation, flood protection, and power generation to the lower Teton region of southern Idaho. The dam site was located next to the eastern Snake River plain, a volcanic filled depression. The foundation's cutoff trench was excavated into the bedrock along the length of the dam. The dam was designed as a zoned earthfill with a height of 305 feet. A trench made of low plasticity windblown silt was designed to connect the embankment core to the rock foundation. Seeps were noted in 1976, and a leak was observed near the toe of the dam. A wet spot appeared on the downstream face of the dam at elevation 5200. A sinkhole then developed. The embankment crest collapsed, and the dam breached. Peak outflow was estimated at 1,000,000 cfs. The failure was attributed to a lack of communication between designers, a failure to understand geologic information about the region, and an insufficient review of designs and specifications by designers and field personnel. No monitoring instrumentation was installed in the embankment. Approximately 300 square miles were inundated, and 25,000 people were displaced. Eleven people were killed. A review group noted that the rock surface was not adequately sealed, and that the dam failed as a result of inadequate protection of the impervious core material from internal erosion. 42 figs.

  16. The occurrence and removal of algae (including cyanobacteria) and their related organic compounds from source water in Vaalkop Dam with conventional and advanced drinking water treatment processes

    OpenAIRE

    Swanepoel, A; Du Preez, HH; Cloete, N

    2017-01-01

    Cyanobacterial bloom formation in freshwaters, such as rivers, lakes and dams, is known to occur throughout the world. The Vaalkop Dam, which serves as source to the Vaalkop drinking water treatment works (DWTW), is no exception. Blooms of cyanobacteria occur annually in Vaalkop Dam as well as in dams from which Vaalkop is replenished during low-rainfall periods. These blooms during the summer months are associated with the production of cyanotoxins and taste and odour compounds such as geosm...

  17. Temporary Restoration of Bull Trout Passage at Albeni Falls Dam

    Energy Technology Data Exchange (ETDEWEB)

    Paluch, Mark; Scholz, Allan; McLellan, Holly [Eastern Washington University Department of Biology; Olson, Jason [Kalispel Tribe of Indians Natural Resources Department

    2009-07-13

    This study was designed to monitor movements of bull trout that were provided passage above Albeni Falls Dam, Pend Oreille River. Electrofishing and angling were used to collect bull trout below the dam. Tissue samples were collected from each bull trout and sent to the U. S. Fish and Wildlife Service Abernathy Fish Technology Center Conservation Genetics Lab, Washington. The DNA extracted from tissue samples were compared to a catalog of bull trout population DNA from the Priest River drainage, Lake Pend Oreille tributaries, and the Clark Fork drainage to determine the most probable tributary of origin. A combined acoustic radio or radio tag was implanted in each fish prior to being transported and released above the dam. Bull trout relocated above the dam were able to volitionally migrate into their natal tributary, drop back downstream, or migrate upstream to the next dam. A combination of stationary radio receiving stations and tracking via aircraft, boat, and vehicle were used to monitor the movement of tagged fish to determine if the spawning tributary it selected matched the tributary assigned from the genetic analysis. Seven bull trout were captured during electrofishing surveys in 2008. Of these seven, four were tagged and relocated above the dam. Two were tagged and left below the dam as part of a study monitoring movements below the dam. One was immature and too small at the time of capture to implant a tracking tag. All four fish released above the dam passed by stationary receivers stations leading into Lake Pend Oreille and no fish dropped back below the dam. One of the radio tags was recovered in the tributary corresponding with the results of the genetic test. Another fish was located in the vicinity of its assigned tributary, which was impassable due to low water discharge at its mouth. Two fish have not been located since entering the lake. Of these fish, one was immature and not expected to enter its natal tributary in the fall of 2008. The other

  18. Holocene lake-level fluctuations of Lake Aricota, Southern Peru

    Science.gov (United States)

    Placzek, C.; Quade, Jay; Betancourt, J.L.

    2001-01-01

    Lacustrine deposits exposed around Lake Aricota, Peru (17?? 22???S), a 7.5-km2 lake dammed by debris flows, provide a middle to late Holocene record of lake-level fluctuations. Chronological context for shoreline deposits was obtained from radiocarbon dating of vascular plant remains and other datable material with minimal 14C reservoir effects (Titicaca (16?? S), which is only 130 km to the northeast and shares a similar climatology. Comparisons with other marine and terrestrial records highlight emerging contradictions over the nature of mid-Holocene climate in the central Andes. ?? 2001 University of Washington.

  19. Dams and Intergovernmental Transfers

    Science.gov (United States)

    Bao, X.

    2012-12-01

    Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.

  20. Performance of Models for Flash Flood Warning and Hazard Assessment : The 2015 Kali Gandaki Landslide Dam Breach in Nepal

    NARCIS (Netherlands)

    Bricker, J.D.; Schwanghart, W.; Raj Adhikari, B.; Moriguchi, S.; Roeber, Volker; Giri, S.

    2017-01-01

    The 2015 magnitude 7.8 Gorkha earthquake and its aftershocks weakened mountain slopes in Nepal. Co- and postseismic landsliding and the formation of landslide-dammed lakes along steeply dissected valleys were widespread, among them a landslide that dammed the Kali Gandaki River. Overtopping of the

  1. Qu'Appelle River Dam, dam break analysis using advanced GIS tools for rapid modelling and inundation mapping

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, D. [Hatch Energy, Winnipeg, MB (Canada); Campbell, C. [Saskatchewan Watershed Authority, Moose Jaw, SK (Canada); Groeneveld, J. [Hatch Energy, Calgary, AB (Canada)

    2008-07-01

    The South Saskatchewan River Project (SSRP) comprises a multi-purpose reservoir that provides water for conservation and irrigation, flood control, power generation, recreation, and municipal and industrial water supply. In addition to the 64 m high Gardiner Dam, the 27 m high Qu'Appelle River Dam and the 22 km long Lake Diefenbaker Reservoir, the SSRP also includes ancillary works. The Qu'Appelle River valley extends for 458 km before connecting to the Assiniboine River. The valley is incised up to 90 m in depth and is a popular cottaging and recreational area with several major communities located in the flood plain. In the event of a breach of the Qu'Appelle Dam, the discharge will increase from a normal maximum discharge of under 60 m{sup 3} per second to over 50,000 m{sup 3} per second. The Saskatchewan Watershed Authority (SWA) is responsible for ensuring safe development of the Province's water resources, without affecting reservoir or lake operations, and preventing damage from flooding, erosion or land slides. It is in the process of developing Hazard Assessments and emergency preparedness plans for each of their dams in accordance with the Canadian Dam Safety Guidelines. Studies using GIS technology and the hydrodynamic routing model HEC-RAS have been completed to evaluate the potential inundation that may result in the event of failure of the Qu'Appelle River Dam. These studies involved the development of a breach parameter model using a breach data set revised to better reflect the Qu'Appelle River Dam; the development of a dam break model for the Qu'Appelle River Dam and downstream river and flood plain; and, the use of this model to simulate two potential dam failure scenarios for the Qu'Appelle River Dam, notably failure during passage of the PMF and failure during fair weather conditions. Inundation maps have been prepared for the downstream Qu'Appelle River valley for each of the above events. 3 refs., 4

  2. Management plan for White Oak Dam. Revision 1

    International Nuclear Information System (INIS)

    Ahmed, S.B.

    1997-03-01

    The purpose is to provide operation and maintenance, periodic inspection, and emergency action plans for White Oak Dam in general accordance with the Federal Emergency Management Agency (FEMA) guidelines for dam safety. It must be understood that operations at the site are primarily for purposes of environmental monitoring, environmental protection and waste management operations control. Effluent is generally allowed to flow from the lake at its natural rate by rising above the broad crested weir notch elevation of 744 feet m.s.l

  3. Urinary Schistosomiasis in Communities around Kiri Lake, Shelleng ...

    African Journals Online (AJOL)

    ADOWIE PERE

    swim and play in nearby lakes and irrigation channels, women ... controlled. In preference, the dam is used by residents .... the fresh water, streams and or pools near their farms after each .... Princeton energy resources international. (peri).

  4. Wynoochee Dam Foundation Report

    Science.gov (United States)

    1988-01-01

    schists and in propylitized andesite volcanic rocks. Tests on chlorite-bearing graywackes (Lumni Island and Robe Quarry, Seattle District) and... propylitized chlorite-bearing andesites (Blue River and Lookout Point Dams, Portland District) have shown these rocks to be durable materials with only minor

  5. Army Corps of Engineers: Actions Needed to Improve Cost Sharing for Dam Safety Repairs

    Science.gov (United States)

    2015-12-01

    agreements with the Corps, their history of being a sponsor, the financial impacts of cost sharing for dam safety repair projects, and the Corps...1240 (2007)) and Beaver Lake dam, AR (Pub. L. No. 102-377, 106 Stat. 1315, 1318 (1992), Pub. L. No. 102-580, § 209(f), 106 Stat. 4797, 4830 (1992...inaction in setting a clear policy for a provision under which sponsors face significant financial impacts has contributed to conditions under

  6. Limnology of hartbeespoort dam

    CSIR Research Space (South Africa)

    Ashton, PJ

    1985-01-01

    Full Text Available , ecosystem modelling, lake management Project management, bacteriology, primary production, physical limnology Mi-aroaystis toxicity Phosphorus kinetics, physico-chemical limno- logy, lake management Sediment-water interactions, ecosystem model- ling..., the bacteria and benthic invertebrate fauna, have thus far not been studied sufficiently for understanding of the flow of phosphorus into and out of detritus. (iv) The study has shown that ecosystem modelling has a very useful role in the management...

  7. Simulating potential structural and operational changes for Detroit Dam on the North Santiam River, Oregon-Interim Results

    Science.gov (United States)

    Buccola, Norman L.; Rounds, Stewart A.

    2011-01-01

    Prior to operational changes in 2007, Detroit Dam on the North Santiam River in western Oregon had a well-documented effect on downstream water temperature that was problematic for endangered salmonid fish species. In this U.S. Geological Survey study, done in cooperation with the U.S. Army Corps of Engineers, an existing calibrated CE-QUAL-W2 model of Detroit Lake (the impounded waterbody behind Detroit Dam) was used to determine how changes in dam operation or changes to the structural release points of Detroit Dam might affect downstream water temperatures under a range of historical hydrologic and meteorological conditions.

  8. Turbid releases from Glen Canyon Dam, Arizona, following rainfall-runoff events of September 2013

    Science.gov (United States)

    Wildman, Richard A.; Vernieu, William

    2017-01-01

    Glen Canyon Dam is a large dam on the Colorado River in Arizona. In September 2013, it released turbid water following intense thunderstorms in the surrounding area. Turbidity was >15 nephelometric turbidity units (NTU) for multiple days and >30 NTU at its peak. These unprecedented turbid releases impaired downstream fishing activity and motivated a rapid-response field excursion. At 5 locations upstream from the dam, temperature, specific conductance, dissolved oxygen, chlorophyll a, and turbidity were measured in vertical profiles. Local streamflow and rainfall records were retrieved, and turbidity and specific conductance data in dam releases were evaluated. Profiling was conducted to determine possible sources of turbidity from 3 tributaries nearest the dam, Navajo, Antelope, and Wahweap creeks, which entered Lake Powell as interflows during this study. We discuss 4 key conditions that must have been met for tributaries to influence turbidity of dam releases: tributary flows must have reached the dam, tributary flows must have been laden with sediment, inflow currents must have been near the depth of dam withdrawals, and the settling velocity of particles must have been slow. We isolate 2 key uncertainties that reservoir managers should resolve in future similar studies: the reach of tributary water into the reservoir thalweg and the distribution of particle size of suspended sediment. These uncertainties leave the source of the turbidity ambiguous, although an important role for Wahweap Creek is possible. The unique combination of limnological factors we describe implies that turbid releases at Glen Canyon Dam will continue to be rare.

  9. Owyhee River intracanyon lava flows: does the river give a dam?

    Science.gov (United States)

    Ely, Lisa L.; Brossy, Cooper C.; House, P. Kyle; Safran, Elizabeth B.; O'Connor, Jim E.; Champion, Duane E.; Fenton, Cassandra R.; Bondre, Ninad R.; Orem, Caitlin A.; Grant, Gordon E.; Henry, Christopher D.; Turrin, Brent D.

    2013-01-01

    Rivers carved into uplifted plateaus are commonly disrupted by discrete events from the surrounding landscape, such as lava flows or large mass movements. These disruptions are independent of slope, basin area, or channel discharge, and can dominate aspects of valley morphology and channel behavior for many kilometers. We document and assess the effects of one type of disruptive event, lava dams, on river valley morphology and incision rates at a variety of time scales, using examples from the Owyhee River in southeastern Oregon. Six sets of basaltic lava flows entered and dammed the river canyon during two periods in the late Cenozoic ca. 2 Ma–780 ka and 250–70 ka. The dams are strongly asymmetric, with steep, blunt escarpments facing up valley and long, low slopes down valley. None of the dams shows evidence of catastrophic failure; all blocked the river and diverted water over or around the dam crest. The net effect of the dams was therefore to inhibit rather than promote incision. Once incision resumed, most of the intracanyon flows were incised relatively rapidly and therefore did not exert a lasting impact on the river valley profile over time scales >106 yr. The net long-term incision rate from the time of the oldest documented lava dam, the Bogus Rim lava dam (≤1.7 Ma), to present was 0.18 mm/yr, but incision rates through or around individual lava dams were up to an order of magnitude greater. At least three lava dams (Bogus Rim, Saddle Butte, and West Crater) show evidence that incision initiated only after the impounded lakes filled completely with sediment and there was gravel transport across the dams. The most recent lava dam, formed by the West Crater lava flow around 70 ka, persisted for at least 25 k.y. before incision began, and the dam was largely removed within another 35 k.y. The time scale over which the lava dams inhibit incision is therefore directly affected by both the volume of lava forming the dam and the time required for sediment

  10. Expansion at Olympic Dam

    International Nuclear Information System (INIS)

    Lewis, C.

    1997-01-01

    The Olympic Dam orebody is the 6th largest copper and the single largest uranium orebody in the world. Mine production commenced in June 1988, at an annual production rate of around 45,000 tonnes of copper and 1,000 tonnes of uranium. Western Mining Corporation announced in 1996 a proposed $1.25 billion expansion of the Olympic Dam operation to raise the annual production capacity of the mine to 200,000 tonnes of copper, approximately 3,700 tonnes of uranium, 75,000 ounces of gold and 950,000 ounces of silver by 2001. Further optimisation work has identified a faster track expansion route, with an increase in the capital cost to $1.487 billion but improved investment outcome, a new target completion date of end 1999, and a new uranium output of 4,600 tonnes per annum from that date

  11. Dam spills and fishes

    International Nuclear Information System (INIS)

    1996-01-01

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.)

  12. Holocene Lake-Level Fluctuations of Lake Aricota, Southern Peru

    Science.gov (United States)

    Placzek, Christa; Quade, Jay; Betancourt, Julio L.

    2001-09-01

    Lacustrine deposits exposed around Lake Aricota, Peru (17° 22‧S), a 7.5-km2 lake dammed by debris flows, provide a middle to late Holocene record of lake-level fluctuations. Chronological context for shoreline deposits was obtained from radiocarbon dating of vascular plant remains and other datable material with minimal 14C reservoir effects (<350 yr). Diatomites associated with highstands several meters above the modern lake level indicate wet episodes. Maximum Holocene lake level was attained before 6100 14C yr B.P. and ended ∼2700 14C yr B.P. Moderately high lake levels occurred at 1700 and 1300 14C yr B.P. The highstand at Lake Aricota during the middle Holocene is coeval with a major lowstand at Lake Titicaca (16°S), which is only 130 km to the northeast and shares a similar climatology. Comparisons with other marine and terrestrial records highlight emerging contradictions over the nature of mid-Holocene climate in the central Andes.

  13. Estimated strength of shear keys in concrete dams

    Energy Technology Data Exchange (ETDEWEB)

    Curtis, D.D. [Hatch Energy, Niagara Falls, ON (Canada); Lum, K.K.Y. [BC Hydro, Burnaby, BC (Canada)

    2008-07-01

    BC Hydro requested that Hatch Energy review the seismic stability of Ruskin Dam which was constructed in 1930 at Hayward Lake in British Columbia. The concrete gravity dam is founded nearly entirely on rock in a narrow valley. The vertical joints between blocks are keyed and grouted. The strength of the shear keys was assessed when a non-linear finite element model found that significant forces were being transferred laterally to the abutments during an earthquake. The lateral transfer of loads to the abutment relies on the strength of the shear keys. The dynamic finite element analysis was used to determine the stability of the dam. A review of the shear strength measurements reported in literature showed that the measurements compared well to those obtained by BC Hydro from cores taken from Ruskin Dam. The cohesive strength obtained using the Griffith failure criteria was also in good agreement with both sets of measurements. A simple ultimate shear strength equation was developed using the Mohr-Coulomb failure criteria to determine combined cohesive and frictional strength of shear keys. Safety factors of 2.0 for static loads and 1.5 for seismic loads were proposed to reduce the ultimate strength to allowable values. It was concluded that given the relatively high shear strength established for the shear keys, the abutment rock or dam/abutment contact will control the amount of load which can arch to the abutments. 8 refs., 4 tabs., 5 figs.

  14. Transient Tsunamis in Lakes

    Science.gov (United States)

    Couston, L.; Mei, C.; Alam, M.

    2013-12-01

    A large number of lakes are surrounded by steep and unstable mountains with slopes prone to failure. As a result, landslides are likely to occur and impact water sitting in closed reservoirs. These rare geological phenomena pose serious threats to dam reservoirs and nearshore facilities because they can generate unexpectedly large tsunami waves. In fact, the tallest wave experienced by contemporary humans occurred because of a landslide in the narrow bay of Lituya in 1958, and five years later, a deadly landslide tsunami overtopped Lake Vajont's dam, flooding and damaging villages along the lakefront and in the Piave valley. If unstable slopes and potential slides are detected ahead of time, inundation maps can be drawn to help people know the risks, and mitigate the destructive power of the ensuing waves. These maps give the maximum wave runup height along the lake's vertical and sloping boundaries, and can be obtained by numerical simulations. Keeping track of the moving shorelines along beaches is challenging in classical Eulerian formulations because the horizontal extent of the fluid domain can change over time. As a result, assuming a solid slide and nonbreaking waves, here we develop a nonlinear shallow-water model equation in the Lagrangian framework to address the problem of transient landslide-tsunamis. In this manner, the shorelines' three-dimensional motion is part of the solution. The model equation is hyperbolic and can be solved numerically by finite differences. Here, a 4th order Runge-Kutta method and a compact finite-difference scheme are implemented to integrate in time and spatially discretize the forced shallow-water equation in Lagrangian coordinates. The formulation is applied to different lake and slide geometries to better understand the effects of the lake's finite lengths and slide's forcing mechanism on the generated wavefield. Specifically, for a slide moving down a plane beach, we show that edge-waves trapped by the shoreline and free

  15. Dam pre-release as an important operation strategy in reducing flood impact in Malaysia

    Science.gov (United States)

    Hidayah Ishak, Nurul; Mustafa Hashim, Ahmad

    2018-03-01

    The 2014 flood was reported to be one of the worst natural disaster has ever affected several states in the northern part of Peninsular Malaysia. Overwhelming rainfall was noted as one of the main factors causing such impact, which was claimed to be unprecedented to some extent. The state of Perak, which is blessed with four cascading dams had also experienced flood damage at a scale that was considered the worst in history. The rainfall received had caused the dam to reach danger level that necessitated additional discharge to be released. Safety of the dams was of great importance and such unavoidable additional discharge was allowed to avoid catastrophic failure of the dam structures. This paper discusses the dam pre-release as a significant dam management strategy in reducing flood impact. An important balance between required dam storage to be maintained and the risk element that can be afforded is the crucial factor in such enhanced operation strategy. While further possibility in developing a carefully engineered dam pre-release strategy can be explored for dam operation in Malaysia, this has already been introduced in some developed countries. Australia and South Africa are examples where pre-release has been practiced and proven to reduce flood risk. The concept involves controlling the dam lake level throughout the year, in reference to the rainfall data and the hydrological properties for the catchment area of the dams. Plentiful data analysis need to be done in contemplation of producing the optimal pre-release model. The amount of heavy rainfalls received is beyond human control but the distribution of the discharge from the dams can be further managed with the appropriate pre-release strategy.

  16. Odelouca Dam Construction: Numerical Analysis

    OpenAIRE

    Brito, A.; Maranha, J. R.; Caldeira, L.

    2012-01-01

    Odelouca dam is an embankment dam, with 76 m height, recently constructed in the south of Portugal. It is zoned with a core consisting of colluvial and residual schist soil and with soil-rockfill mixtures making up the shells (weathered schist with a significant fraction of coarse sized particles). This paper presents a numerical analysis of Odelouca Dam`s construction. The material con-stants of the soil model used are determined from a comprehensive testing programme carried out in the C...

  17. Health impacts of large dams

    International Nuclear Information System (INIS)

    Lerer, L.B.

    1999-01-01

    Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects

  18. Modeling Lake Turkana Hydrology: Evaluating the potential hydrological impact of Gibe III reservoir on the Lake Turkana water levels using multi-source satellite data

    Science.gov (United States)

    Velpuri, N.; Senay, G. B.

    2012-12-01

    Ethiopia is currently building the Gibe III hydroelectric dam on the Omo River, which supplies >80% of the inflows to Lake Turkana, Kenya. On completion, the Gibe III dam will be the tallest dam in Africa (height of 241 m) with a storage capacity of 14.5 billion m3. Arguably, this is one of the most controversial hydro-power projects in the region because the nature of interactions and potential impacts of the dam regulated flows on Lake Turkana are not well understood due to its remote location and unavailability of reliable in situ hydrological datasets. In this research, we used a calibrated multi-source satellite data-driven water balance model for Lake Turkana that takes into account 12 years (1998-2009) of satellite rainfall, model routed runoff, lake/reservoir evapotranspiration, direct rain on lakes/reservoirs and releases from the dam to compute lake water levels. The model was used to evaluate the impact of the Gibe III dam using three different simple but robust approaches - a historical approach; a rainfall based sampling approach; and a non-parametric bootstrap resampling approach to generate rainfall-runoff scenarios. Modelling results indicate that, on average, the reservoir would take up to 8-10 months to reach minimum operation level of 201 m (initial impoundment period). During this period, the dam would regulate the lake inflows up to 50% and as a result the lake level would drop up to 2 m. However, after the initial impoundment period, due to releases from the dam, the rate of lake inflows would be around 10 m3/s less when compared to the rate without Gibe III (650 m3/s). Due to this, the lake levels will decline on average 1.5 m (3 m). Over the entire modeling period including the initial period of impoundment, the average rate of lake inflows due to Gibe III dam was estimated to be 500 m3/s. Results indicated that dam would also moderate the seasonal fluctuations in the lake. Areas along the Lake Turkana shoreline that are vulnerable to

  19. Dam Break Analysis of Embankment Dams Considering Breach Characteristics

    Directory of Open Access Journals (Sweden)

    Abolfazl Shamsaei

    2004-05-01

    Full Text Available The study of dam's break, needs the definition of various parameters such as the break cause, its type, its dimension and the duration of breach development. The precise forecast for different aspects of the breach is one of the most important factors for analyzing it in embankment dam. The characteristics of the breach and determination of their vulnerability has the most effect on the waves resulting from dam break. Investigating, about the parameters of the breach in "Silveh" earth dam have been determined using the suitable model. In Silve dam a trapezoid breach with side slope z=0.01m and the average base line b=80m was computed. The duration of the breaches development is 1.9 hour. Regarding the above results and the application of DAM Break software the consequences of the probable break of the dam was determined. The analysis of the results of water covering of the city of Piranshahr located 12km from silve dam confirms that in 3 hours the water will reach the height (level of 1425 meters.

  20. Dam safety investigations of the concrete structures of Hugh Keenleyside dam

    International Nuclear Information System (INIS)

    Hanna, A.W.; Nunn, J.O.H.; Cornish, L.; Northcott, P.

    1993-01-01

    The Hugh Keenleyside dam is located on the Columbia River in southeastern British Columbia, and impounds Arrow Lakes Reservoir which has a live storage of 8.8 km 3 and drains an area of 36,000 km 2 . It consists of a number of concrete structures, with a total length of 360 m and a maximum height of 58 m, and an earthfill embankment which spans across the original river channel. The 450 m long zoned earthfill dam is founded on pervious alluvium over 150 m deep. It has a sloping impervious core constructed from glacial till which extends 670 m upstream of the dam. This impervious blanket extends over the full width of the reservoir and is connected to the upstream face of the concrete structures. The results of a dam safety study, which was carried out due to the presence of high uplift pressures at some parts of the foundation, and stability concerns, are presented. The investigation concluded that the high uplift pressures were due to a localized defect in the upstream blanket and did not indicate any general deterioration of the blanket. Techniques that were found to be of particular use in the study for defining the source and nature of the foundation defects were: temperature surveys of flows from piezometers, cells and drains; air injection tests; and pressure response testing of cells, piezometers and drains to establish foundation interconnections. The concrete structures met the stability criteria for all load cases considered except for the navigation lock and the low level outlets. 3 refs., 6 figs

  1. Analytical Solution and Application for One-Dimensional Consolidation of Tailings Dam

    Directory of Open Access Journals (Sweden)

    Hai-ming Liu

    2018-01-01

    Full Text Available The pore water pressure of tailings dam has a very great influence on the stability of tailings dam. Based on the assumption of one-dimensional consolidation and small strain, the partial differential equation of pore water pressure is deduced. The obtained differential equation can be simplified based on the parameters which are constants. According to the characteristics of the tailings dam, the pore water pressure of the tailings dam can be divided into the slope dam segment, dry beach segment, and artificial lake segment. The pore water pressure is obtained through solving the partial differential equation by separation variable method. On this basis, the dissipation and accumulation of pore water pressure of the upstream tailings dam are analyzed. The example of typical tailings is introduced to elaborate the applicability of the analytic solution. What is more, the application of pore water pressure in tailings dam is discussed. The research results have important scientific and engineering application value for the stability of tailings dam.

  2. Statistical characteristics and stability index (si) of large-sized landslide dams around the world

    International Nuclear Information System (INIS)

    Iqbal, J.; Dai, F.; Raja, I.A.

    2014-01-01

    In the last few decades, landslide dams have received greater attention of researchers, as they have caused loss to property and human lives. Over 261 large-sized landslide dams from different countries of the world with volume greater than 1 x 105 m have been reviewed for this study. The data collected for this study shows that 58% of the catastrophic landslides were triggered by earthquakes and 21 % by rainfall, revealing that earthquake and rainfall are the two major triggers, accounting for 75% of large-sized landslide dams. These land-slides were most frequent during last two decades (1990-2010) throughout the world. The mean landslide dam volume of the studied cases was 53.39 x 10 m with mean dam height of 71.98 m, while the mean lake volume was found to be 156.62 x 10 m. Failure of these large landslide dams pose a severe threat to the property and people living downstream, hence immediate attention is required to deal with this problem. A stability index (SI) has been derived on the basis on 59 large-sized landslide dams (out of the 261 dams) with complete parametric information. (author)

  3. Trading river services: optimizing dam decisions at the basin scale to improve socio-ecological resilience

    Science.gov (United States)

    Roy, S. G.; Gold, A.; Uchida, E.; McGreavy, B.; Smith, S. M.; Wilson, K.; Blachly, B.; Newcomb, A.; Hart, D.; Gardner, K.

    2017-12-01

    Dam removal has become a cornerstone of environmental restoration practice in the United States. One outcome of dam removal that has received positive attention is restored access to historic habitat for sea-run fisheries, providing a crucial gain in ecosystem resilience. But dams also provide stakeholders with valuable services, and uncertain socio-ecological outcomes can arise if there is not careful consideration of the basin scale trade offs caused by dam removal. In addition to fisheries, dam removals can significantly affect landscape nutrient flux, municipal water storage, recreational use of lakes and rivers, property values, hydroelectricity generation, the cultural meaning of dams, and many other river-based ecosystem services. We use a production possibility frontiers approach to explore dam decision scenarios and opportunities for trading between ecosystem services that are positively or negatively affected by dam removal in New England. Scenarios that provide efficient trade off potentials are identified using a multiobjective genetic algorithm. Our results suggest that for many river systems, there is a significant potential to increase the value of fisheries and other ecosystem services with minimal dam removals, and further increases are possible by including decisions related to dam operations and physical modifications. Run-of-river dams located near the head of tide are often found to be optimal for removal due to low hydroelectric capacity and high impact on fisheries. Conversely, dams with large impoundments near a river's headwaters can be less optimal for dam removal because their value as nitrogen sinks often outweighs the potential value for fisheries. Hydropower capacity is negatively impacted by dam removal but there are opportunities to meet or exceed lost capacity by upgrading preserved hydropower dams. Improving fish passage facilities for dams that are critical for safety or water storage can also reduce impacts on fisheries. Our

  4. The mathematics of dam safety

    Energy Technology Data Exchange (ETDEWEB)

    Widmann, R. [Osterreichische Gesellschaft fuer Geomechanik, Salzburg (Austria)

    1997-05-01

    The safety of a dam is determined by its design, construction and supervision during operation. High arch dam failures have dropped dramatically since the early part of this century. An essential part of the success story relates to improved measurement techniques that can detect earlier unexpected behaviour that may lead to failure. (UK)

  5. Evaluatie Dam tot Damloop 2014

    NARCIS (Netherlands)

    Deutekom-Baart de la Faille, Marije

    In het weekend van 20 en 21 september 2014 vond de 30ste editie van de Dam tot Damloop plaats. Onderzoekers van de Hogeschool van Amsterdam en Hogeschool Inholland hebben bij de Dam tot Damloop een evaluatieonderzoek uitgevoerd met als doel het vinden van aanknopingspunten voor het structureel

  6. War damages and reconstruction of Peruca dam

    International Nuclear Information System (INIS)

    Nonveiller, E.; Sever, Z.

    1999-01-01

    The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described

  7. Dam-Breach hydrology of the Johnstown flood of 1889-challenging the findings of the 1891 investigation report.

    Science.gov (United States)

    Coleman, Neil M; Kaktins, Uldis; Wojno, Stephanie

    2016-06-01

    In 1891 a report was published by an ASCE committee to investigate the cause of the Johnstown flood of 1889. They concluded that changes made to the dam by the South Fork Fishing and Hunting Club did not cause the disaster because the embankment would have been overflowed and breached if the changes were not made. We dispute that conclusion based on hydraulic analyses of the dam as originally built, estimates of the time of concentration and time to peak for the South Fork drainage basin, and reported conditions at the dam and in the watershed. We present a LiDAR-based volume of Lake Conemaugh at the time of dam failure (1.455 × 10(7) m(3)) and hydrographs of flood discharge and lake stage decline. Our analytical approach incorporates the complex shape of this dam breach. More than 65 min would have been needed to drain most of the lake, not the 45 min cited by most sources. Peak flood discharges were likely in the range 7200 to 8970 m(3) s(-1). The original dam design, with a crest ∼0.9 m higher and the added capacity of an auxiliary spillway and five discharge pipes, had a discharge capacity at overtopping more than twice that of the reconstructed dam. A properly rebuilt dam would not have overtopped and would likely have survived the runoff event, thereby saving thousands of lives. We believe the ASCE report represented state-of-the-art for 1891. However, the report contains discrepancies and lapses in key observations, and relied on excessive reservoir inflow estimates. The confidence they expressed that dam failure was inevitable was inconsistent with information available to the committee. Hydrodynamic erosion was a likely culprit in the 1862 dam failure that seriously damaged the embankment. The Club's substandard repair of this earlier breach sowed the seeds of its eventual destruction.

  8. The Effect of Paved Roads on Organic Carbon Content of Soil in Taham Dam Basin

    Directory of Open Access Journals (Sweden)

    Mazyar Peyda

    2016-09-01

    Full Text Available Background: Contamination of water and soil through non-point sources such as road runoff causes environmental concern. The aim of this study is to determine the effect of Zanjan – Chavarzagh road on the total organic carbon (TOC content of sediments in tributaries and the river that lead to Taham Lake. Methods: In tributaries and the river 69 soil and sediment samples were taken and the Total organic carbon (TOC was measured according to Walkely-Black method. Also, Taham Dam Basin area and its hydrologic properties were calculated by Global Information System (GIS software. Results: Results showed that, TOC concentration has a significant negative relationship with the distance from the lake. TOC in soil samples taken from hillside of the road had significantly lower mean and median concentration ( median= 3262 , mean = 4083 ± 3461 mg/kg than the valley side ( median = 5324 , mean = 6178 ± 3980 mg/kg. The check dams across the tributaries and the river have not been effective in the reduction of TOC in sediments. Conclusion: Roads in the Taham Dam Basin, increases TOC content of soil and sediments in Taham dam basin. TOC moves toward Taham dam lake.

  9. Damming evidence : Canada and the World Commission on Dams

    Energy Technology Data Exchange (ETDEWEB)

    Vert, P.; Parkinson, B.

    2003-06-01

    Large hydroelectric projects have been met with strong resistance from affected communities, particularly indigenous groups who have been displaced from their flooded communities following the damming of a river. The World Commission on Dams (WCD) was formed in 1998 to review the effectiveness of large dams and develop internationally acceptable guidelines and standards for large dams or hydro energy projects. The Canadian government, through the Canadian International Development Agency, was one of many governments to fund the WCD. However, the authors argue that despite the financial support, the Canadian government was absent from any effort to follow-up on the recommendations of the WCD. The seven strategic priorities in the decision making process include: (1) gaining public acceptance, (2) comprehensive option assessment of water, energy, food and development needs, (3) addressing existing dams to improve the benefits that can be derived from them, (4) sustaining livelihoods, (5) recognizing the entitlements and sharing benefits, (6) ensuring compliance, and (7) sharing rivers for peace, development and security. This report offers a means to assess planned or existing dams and presents a set of guidelines for good practices linked to the seven strategic priorities. Ten case studies from around the world were presented, including the Three Gorges Dam in China. 154 refs., 3 figs., 3 appendices.

  10. Spatial distribution and temporal development of high-mountain lakes in western Austria

    Science.gov (United States)

    Merkl, Sarah; Emmer, Adam; Mergili, Martin

    2015-04-01

    Glacierized high-mountain environments are characterized by active morphodynamics, favouring the rapid appearance and disappearance of lakes. On the one hand, such lakes indicate high-mountain environmental changes such as the retreat of glaciers. On the other hand, they are sometimes susceptible to sudden drainage, leading to glacial lake outburst floods (GLOFs) putting the downstream population at risk. Whilst high-mountain lakes have been intensively studied in the Himalayas, the Pamir, the Andes or the Western Alps, this is not the case for the Eastern Alps. A particular research gap, which is attacked with the present work, concerns the western part of Austria. We consider a study area of approx. 6,140 km², covering the central Alps over most of the province of Tyrol and part of the province of Salzburg. All lakes ≥250 m² located higher than 2000 m asl are mapped from high-resolution Google Earth imagery and orthophotos. The lakes are organized into seven classes: (i) ice-dammed; near-glacial (ii) moraine-dammed and (iii) bedrock-dammed; (iv) moraine-dammed and (v) bedrock-dammed distant to the recent glaciers; (vi) landslide-dammed; (vii) anthropogenic. The temporal development of selected lakes is investigated in detail, using aerial photographs dating back to the 1950s. 1045 lakes are identified in the study area. Only eight lakes are ice-dammed (i). One third of all lakes is located in the immediate vicinity of recent glacier tongues, half of them impounded by moraine (ii), half of them by bedrock (iii). Two thirds of all lakes are impounded by features (either moraines or bedrock) shaped by LIA or Pleistocenic glaciers at some distance to the present glacier tongues (iv and v). Only one landslide-dammed lake (vi) is identified in the study area, whilst 21 lakes are of anthropogenic origin (vii). 72% of all lakes are found at 2250-2750 m asl whilst less than 2% are found above 3000 m asl. The ratio of rock-dammed lakes increases with increasing

  11. How Physical Processes are Informing River Management Actions at Marble Bluff Dam, Truckee River, Nevada

    Science.gov (United States)

    Bountry, J.; Godaire, J.; Bradley, D. N.

    2017-12-01

    At the terminus of the Truckee River into Pyramid Lake (Nevada, USA), upstream river management actions have dramatically reshaped the river landscape, posing significant challenges for the management of endangered aquatic species and maintenance of existing infrastructure. Within the last 100 years, upstream water withdrawal for human uses has resulted in a rapid lowering of Pyramid Lake which initiated up to 90 ft of channel incision. In 1976 Marble Bluff Dam was constructed to halt the upstream progression of channel incision and protect upstream agricultural lands, tribal resources, and infrastructure. Since construction an additional 40 ft of lake lowering and subsequent channel lowering now poses a potential risk to the structural integrity of the dam. The dynamic downstream river combined with ongoing reservoir sedimentation pose challenges to fish passage facilities that enable migration of numerous endangered cui-ui and threatened Lahontan Cutthroat Trout (LCT) to upstream spawning areas each year. These facilities include a fish lock at the dam, a fish bypass channel which allows fish to avoid the shallow delta area during low lake levels, and a meandering channel constructed by the Nature Conservancy to connect the bypass channel to the receding Pyramid Lake. The reservoir formed by Marble Bluff Dam has completely filled with sediment which impacts fish passage facilities. The original operating manual for the dam recommends year-round flushing of sediment through radial gates, but this can no longer be accomplished. During critical fish migration periods in the spring operators must ensure fish entrance channels downstream of the dam are not buried with released sediment and fish are not trapped in a portion of the reservoir full of sediment that would risk sending them back over the dam. To help inform future reservoir sediment and infrastructure management strategies, we bracket a range of potential river responses to lake level lowering and floods

  12. Climate change effects on design floods for dams in Sweden

    International Nuclear Information System (INIS)

    Andreasson, J.; Bergstroem, S.

    2008-01-01

    Since 1990 new guidelines for hydrological design of the Swedish hydropower system are being implemented. The technique is based on a critical combination of extreme precipitation, extreme snowmelt and an operation strategy for multi-reservoir systems. Hydrological modeling is a central component, as is a prescribed design precipitation sequence. At the time when the guidelines were developed it was not possible to account for possible consequences of a changing climate. Sensitivity analyses using four different regional climate change scenarios (2071-2100) has been carried out for four important Swedish dams and also for the largest lake in Sweden, Lake Vanern. The research project was financed by Elforsk and the Swedish Dam Safety Authority (Svenska Kraftnat) and it was reported in 2006/2007. Some summarizing conclusions are: Changes in the mean climate results in smaller design snow pack according to all scenarios. This component acts towards decreased design inflows and water levels at most locations. Extreme precipitation can be expected to increase at most places in Sweden according to the climate scenarios. This component acts towards increased design inflows and water levels at most locations. Depending on how changes in the mean climate and in the extremes interact, the change in design inflows and water levels can be either an increase or a decrease. The effect depends both on the location of the dam and on the choice of climate scenario. This calls for site-specific analysis for each dam. In 2007 the second edition of the guidelines for hydrological design was issued in which also the question of climate change have been addressed. The first sensitivity analyses are now being extended within a new 2-year research project also funded jointly by Elforsk and the Swedish Dam Safety Authority (Svenska Kraftnat). The aim is to increase the number of regional climate scenarios and the number of high hazard dams in the analysis, but also to move the scenarios

  13. Olympic Dam Operations

    International Nuclear Information System (INIS)

    Crew, R.J.

    1992-01-01

    The Olympic Dam copper-uranium-gold-silver deposit in South Australia was discovered in 1975. The Mine is located 520 kilometres NNW of Adelaide, in South Australia. Following a six year period of intensive investigation and assessment of all the aspects required for the development of the deposit, the Joint Venturers decided in December, 1985, to proceed with the project. Milling of ore commenced in June 1988 and final products are cathode copper, uranium ore concentrate (yellow cake), and refined gold and silver. Anticipated production, from treating approximately 1.5 million tonnes of ore, in normal production years, is expected to be 45,000 tonnes of copper, 1,600 tonnes of yellow cake (1350 tonnes of Uranium), 25,000 ounces of gold and 500,000 ounces of silver. (orig./HP) [de

  14. Rehabilitation at Olympic Dam

    International Nuclear Information System (INIS)

    Chandler, W.P.; Middleton, B.A.

    1986-01-01

    Rehabilitation work on areas denuded of vegetation during the exploration phase of the Olympic Dam project was used to test various methods for regeneration of vegetation cover in the arid zone. The test work carried out on drill pads and access tracks has indicated that, with adequate site preparation, natural regeneration is the most economical and effective method to ensure post-operational stability of the affected land-forms. An on-going monitoring regime, utilising a computer data base, has been set up to allow year-to-year comparison of rehabilitation effectiveness. The database also provides a catalogue of initial colonising plants and a measure of variations in species diversity with time

  15. Local response of a glacier to annual filling and drainage of an ice-marginal lake

    Science.gov (United States)

    Walder, J.S.; Trabant, D.C.; Cunico, M.; Fountain, A.G.; Anderson, S.P.; Anderson, R. Scott; Malm, A.

    2006-01-01

    Ice-marginal Hidden Creek Lake, Alaska, USA, outbursts annually over the course of 2-3 days. As the lake fills, survey targets on the surface of the 'ice dam' (the glacier adjacent to the lake) move obliquely to the ice margin and rise substantially. As the lake drains, ice motion speeds up, becomes nearly perpendicular to the face of the ice dam, and the ice surface drops. Vertical movement of the ice dam probably reflects growth and decay of a wedge of water beneath the ice dam, in line with established ideas about jo??kulhlaup mechanics. However, the distribution of vertical ice movement, with a narrow (50-100 m wide) zone where the uplift rate decreases by 90%, cannot be explained by invoking flexure of the ice dam in a fashion analogous to tidal flexure of a floating glacier tongue or ice shelf. Rather, the zone of large uplift-rate gradient is a fault zone: ice-dam deformation is dominated by movement along high-angle faults that cut the ice dam through its entire thickness, with the sense of fault slip reversing as the lake drains. Survey targets spanning the zone of steep uplift gradient move relative to one another in a nearly reversible fashion as the lake fills and drains. The horizontal strain rate also undergoes a reversal across this zone, being compressional as the lake fills, but extensional as the lake drains. Frictional resistance to fault-block motion probably accounts for the fact that lake level falls measurably before the onset of accelerated horizontal motion and vertical downdrop. As the overall fault pattern is the same from year to year, even though ice is lost by calving, the faults must be regularly regenerated, probably by linkage of surface and bottom crevasses as ice is advected toward the lake basin.

  16. The effects of Medieval dams on genetic divergence and demographic history in brown trout populations.

    Science.gov (United States)

    Hansen, Michael M; Limborg, Morten T; Ferchaud, Anne-Laure; Pujolar, José-Martin

    2014-06-05

    Habitat fragmentation has accelerated within the last century, but may have been ongoing over longer time scales. We analyzed the timing and genetic consequences of fragmentation in two isolated lake-dwelling brown trout populations. They are from the same river system (the Gudenå River, Denmark) and have been isolated from downstream anadromous trout by dams established ca. 600-800 years ago. For reference, we included ten other anadromous populations and two hatchery strains. Based on analysis of 44 microsatellite loci we investigated if the lake populations have been naturally genetically differentiated from anadromous trout for thousands of years, or have diverged recently due to the establishment of dams. Divergence time estimates were based on 1) Approximate Bayesian Computation and 2) a coalescent-based isolation-with-gene-flow model. Both methods suggested divergence times ca. 600-800 years bp, providing strong evidence for establishment of dams in the Medieval as the factor causing divergence. Bayesian cluster analysis showed influence of stocked trout in several reference populations, but not in the focal lake and anadromous populations. Estimates of effective population size using a linkage disequilibrium method ranged from 244 to > 1,000 in all but one anadromous population, but were lower (153 and 252) in the lake populations. We show that genetic divergence of lake-dwelling trout in two Danish lakes reflects establishment of water mills and impassable dams ca. 600-800 years ago rather than a natural genetic population structure. Although effective population sizes of the two lake populations are not critically low they may ultimately limit response to selection and thereby future adaptation. Our results demonstrate that populations may have been affected by anthropogenic disturbance over longer time scales than normally assumed.

  17. Deformation performance of Waba Dam

    Energy Technology Data Exchange (ETDEWEB)

    Salloum, T.; Bhardwaj, V.; Hassan, P. [Ontario Power Generation, Niagara-on-the-Lake, ON (Canada); Cragg, C. [Cragg Consulting Services, Toronto, ON (Canada)

    2009-07-01

    This paper described the performance of the Waba Dam which is being monitored as part of Ontario Power Generation's Dam Safety Program. It described the deformations that have been observed in this 3600 ft long earthfill dam which lies on marine clay in eastern Ontario. An extensive instrumentation program, including foundation settlement gauges, surface monuments, slope inclinometers, load cells and piezometers has been in effect since the construction of the dam in 1975. Significant settlement has occurred at Waba Dam since its construction. Wide berms were provided upstream and downstream beyond the slopes of the main fill to ensure stability of the dyke on the soft clay foundation and the crest elevations were designed to allow for the expected settlement in the foundation which would be overstressed by the dam loading. Based on current settlements, future settlements are predicted based on Asaoka's method. Inclinometer measurements have shown a foundation lateral spreading of 12 in. The lateral versus vertical deformations were found to be comparable to well behaving embankments reported in the literature. These analyses indicate that Waba Dam is performing well and should continue to perform well into the future. 8 refs., 1 tab., 14 figs.

  18. Public safety around dams guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, T [Canadian Dam Association, Edmonton, AB (Canada)

    2010-07-01

    This presentation discussed Canadian and international initiatives for improving dam safety and described some of the drivers for the development of new Canadian Dam Association (CDA) public safety guidelines for dams. The CDA guidelines were divided into the following 3 principal sections: (1) managed system elements, (2) risk assessment and management, and (3) technical bulletins. Public and media responses to the drownings have called for improved safety guidelines. While the public remains unaware of the hazards of dams, public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. Guidelines are needed for dam owners in order to provide due diligence. Various organizations in Canada are preparing technical and public safety dam guidelines. CDA guidelines have also been prepared for signage, booms and buoys, and audible and visual alerts bulletins. Working groups are also discussing recommended practices for spill procedures, spillways and the role of professional engineers in ensuring public safety. Methods of assessing risk were also reviewed. Managed system elements for risk assessment and public interactions were also discussed, and stepped control measures were presented. tabs., figs.

  19. Proceedings of the Canadian Dam Association's 2006 annual conference: dams: past, present and future

    International Nuclear Information System (INIS)

    2006-01-01

    This conference addressed particular technical challenges regarding the operation of dams with particular focus on best practices for improving dam management and safety. It featured 4 workshops and a technical program led by experts on dams and tailings facilities that addressed topics such as dam construction, design and rehabilitation; dam management in a hydrological uncertainty context; monitoring, instrumentation and maintenance; dam behaviour; dam safety, dam failure and practical approaches to emergency preparedness planning for dam owners; historical aspects and environmental issues and conflicting water use. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and dam safety guidelines for extreme flood analyses and their applications. All 80 presentations from this conference have been catalogued separately for inclusion in this database. refs., tabs., figs

  20. 7 CFR 1724.55 - Dam safety.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Dam safety. 1724.55 Section 1724.55 Agriculture... § 1724.55 Dam safety. (a) The provisions of this section apply only to RUS financed electric system... for Dam Safety,”(Guidelines), as applicable. A dam, as more fully defined in the Guidelines, is...

  1. Inverted topographic features, now submerged beneath the water of Lake Nasser, document a morphostratigraphic sequence of high-amplitude late-Pleistocene climate oscillation in Egyptian Nubia

    Science.gov (United States)

    Giegengack, Robert; Zaki, Abdallah S.

    2017-12-01

    The Nile Valley between the Second Cataract at Wadi Halfa and the First Cataract at Aswan has been inundated behind two dams - the Aswan Dam, first built in 1902, and the High Dam (Sa'ad el A'ali), that blocked the flow of the Nile in 1964. The anticipated loss of archeological monuments in Lake Nasser, the reservoir behind the High Dam, initiated an international campaign to protect, move, or at least document as many of those monuments as possible.

  2. Perspectives on dam safety in Canada

    International Nuclear Information System (INIS)

    Halliday, R.

    2004-01-01

    Canadian dam safety issues were reviewed from the perspective of a water resources engineer who is not a dam safety practitioner. Several external factors affecting dam safety were identified along with perceived problems in dam safety administration. The author claims that the main weakness in safety practices can be attributed to provincial oversights and lack of federal engagement. Some additions to the Canadian Dam Safety Guidelines were proposed to address these weaknesses. Canada has hundreds of large dams and high hazard dams whose failure would result in severe downstream consequences. The safety of dams built on boundary waters shared with the United States have gained particular attention from the International Joint Commission. This paper also examined safety criteria for concerns such as aging dams, sabotage and global climate change that may compromise the safety of a dam. 26 refs

  3. Dams and Levees: Safety Risks

    Science.gov (United States)

    Carter, N. T.

    2017-12-01

    The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the

  4. Carbon Dioxide Leaser For The Treatment Of Keloids

    Directory of Open Access Journals (Sweden)

    Verma Kaushal K

    2002-01-01

    Full Text Available Keloids are difficult to treat medically or surgically. Carbon dioxide (CO2 laser is considered to be a better therapeutic option due to less chances of recurrence with this modality. Fourteen patients, 4 males and 10 females, between 9 and 36 years of age having keloids for 1 to 10 years were included in this study. The lesions were present on chest, ear lobes, nape of neck, forearm, arm and shoulder. CO2 laser with a power setting of 10 to 20 watts was used in continuous mode to vaporize/excise the lesions. The patients were followed up at the end of last week, 2nd week and then every 4 weeks for 3 months to evaluate the response to treatment. Twelve patients followed up regularly and completed this study. Six patients with keliods on chest had 50 to 70% response. Remaining 6 patients with keliods on chest had 50 to 70% response. Remaining 6 patients with lesions on the ear lobes (3, showed 50 to 90% response. Nape of neck (1, shoulder, arm and forearm (2 lesions had 50 to 90% response. In all, except one patient the healing started by 4 weeks and complete healing of the treatment area occurred within 8 weeks. Four patients with poor response to CO2 laser alone were given in addition intralesional triaminolone acetonide 40mg/ml, which resulted in a better response in these patients. One patient had depigmentation of the treated area. There were no side effects in other patients. We therefore conclude that CO2 laser is a good therapeutic modality for the treatment of keloids: however recurrence on long term follow up needs to be observed.

  5. Grouting Applications in Cindere Dam

    Directory of Open Access Journals (Sweden)

    Devrim ALKAYA

    2011-01-01

    Full Text Available Grouting is one of the most popular method to control the water leakage in fill dam constructions. With this regard this method is widely used in all the world. Geological and geotechnical properties of rock are important parameters affect the design of grouting. In this study, geotechnical properties of Cindere Dam's base rock and the grouting prosedure have been investigated with grouting pressure.

  6. Ririe Dam Release Test Assessment

    Science.gov (United States)

    2013-06-01

    Notes HEC - RAS Location Station (ft) Observation Notes 1420 Ririe Dam Ririe Dam 119,880 Gates opened and initial release started. 1455 115th St...16°F air temperature. Table A2. Observations made on 11 February 2013. Time Location Notes HEC - RAS Location Station (ft) Observation Notes...ERDC/CRREL TR-13-10 52 Time Location Notes HEC - RAS Location Station (ft) Observation Notes Travel Time* (sec) Vel.** (fps) 1224 5th

  7. Modeling potential scenarios of the Tangjiashan Lake outburst and risk assessment in the downstream valley

    Science.gov (United States)

    Kidyaeva, Vera; Chernomorets, Sergey; Krylenko, Inna; Wei, Fangqiang; Petrakov, Dmitry; Su, Pengcheng; Yang, Hongjuan; Xiong, Junnan

    2017-09-01

    This research is devoted to Tangjiashan Lake, a quake landslide-dammed lake, situated in Sichuan Province, China, which was formed by a landslide triggered by the Wenchuan Earthquake on 12 May 2008. A STREAM_2D two-dimensional hydrodynamic model of Russia was applied to simulate the process of two flood scenarios: 1, lake dam outbreak, and 2, dam overtopping. An artificial dam outbreak was made after the earthquake to lower the water level of the lake in 2008, which led to a great flood with a maximum water discharge of more than 6400 m3/s. The negative impact of the flood was reduced by a timely evacuation of the population. Flood hazards still remain in the event of new landslides into the lake and lake dam overtopping (Scenario 2), in which case a maximum water discharge at the dam crest would reach 5000 m3/s, placing the population of Shabacun and Shilingzi villages in the zone of flood impact.

  8. A new bathymetric survey of the Suwałki Landscape Park lakes

    Directory of Open Access Journals (Sweden)

    Borowiak Dariusz

    2016-12-01

    Full Text Available The results of the latest bathymetric survey of 21 lakes in the Suwałki Landscape Park (SLP are presented here. Measurements of the underwater lake topography were carried out in the years 2012–2013 using the hydroacoustic method (sonar Lawrence 480M. In the case of four lakes (Błędne, Pogorzałek, Purwin, Wodziłki this was the first time a bathymetric survey had been performed. Field material was used to prepare bathymetric maps, which were then used for calculating the basic size and shape parameters of the lake basins. The results of the studies are shown against the nearly 90 year history of bathymetric surveying of the SLP lakes. In the light of the current measurements, the total area of the SLP lakes is over 634 hm2 and its limnic ratio is 10%. Lake water resources in the park were estimated at 143 037.1 dam3. This value corresponds to a retention index of 2257 mm. In addition, studies have shown that the previous morphometric data are not very accurate. The relative differences in the lake surface areas ranged from –14.1 to 9.1%, and in the case of volume – from –32.2 to 35.3%. The greatest differences in the volume, expressed in absolute values, were found in the largest SLP lakes: Hańcza (1716.1 dam3, Szurpiły (1282.0 dam3, Jaczno (816.4 dam3, Perty (427.1 dam3, Jegłówek (391.2 dam3 and Kojle (286.2 dam3. The smallest disparities were observed with respect to the data obtained by the IRS (Inland Fisheries Institute in Olsztyn. The IMGW (Institute of Meteorology and Water Management bathymetric measurements were affected by some significant errors, and morphometric parameters determined on their basis are only approximate.

  9. Beaver dams and channel sediment dynamics on Odell Creek, Centennial Valley, Montana, USA

    Science.gov (United States)

    Levine, Rebekah; Meyer, Grant A.

    2014-01-01

    Beaver dams in streams are generally considered to increase bed elevation through in-channel sediment storage, thus, reintroductions of beaver are increasingly employed as a restoration tool to repair incised stream channels. Here we consider hydrologic and geomorphic characteristics of the study stream in relation to in-channel sediment storage promoted by beaver dams. We also document the persistence of sediment in the channel following breaching of dams. Nine reaches, containing 46 cross-sections, were investigated on Odell Creek at Red Rock Lakes National Wildlife Refuge, Centennial Valley, Montana. Odell Creek has a snowmelt-dominated hydrograph and peak flows between 2 and 10 m3 s- 1. Odell Creek flows down a fluvial fan with a decreasing gradient (0.018-0.004), but is confined between terraces along most of its length, and displays a mostly single-thread, variably sinuous channel. The study reaches represent the overall downstream decrease in gradient and sediment size, and include three stages of beaver damming: (1) active; (2) built and breached in the last decade; and (3) undammed. In-channel sediment characteristics and storage were investigated using pebble counts, fine-sediment depth measurements, sediment mapping and surveys of dam breaches. Upstream of dams, deposition of fine (≤ 2 mm) sediment is promoted by reduced water surface slope, shear stress and velocity, with volumes ranging from 48 to 182 m3. High flows, however, can readily transport suspended sediment over active dams. Variations in bed-sediment texture and channel morphology associated with active dams create substantial discontinuities in downstream trends and add to overall channel heterogeneity. Observations of abandoned dam sites and dam breaches revealed that most sediment stored above beaver dams is quickly evacuated following a breach. Nonetheless, dam remnants trap some sediment, promote meandering and facilitate floodplain development. Persistence of beaver dam sediment

  10. Real-estate lakes

    Science.gov (United States)

    Rickert, David A.; Spieker, Andrew Maute

    1971-01-01

    Since the dawn of civilization waterfront land has been an irresistible attraction to man. Throughout history he has sought out locations fronting on oceans, rivers, and lakes. Originally sought for proximity .to water supply and transportation, such locations are now sought more for their esthetic qualities and for recreation. Usable natural waterfront property is limited, however, and the more desirable sites in many of our urban areas have already been taken. The lack of available waterfront sites has led to the creation of many artificial bodies of water. The rapid suburbanization that has characterized urban growth in America since the end of World War II, together with increasing affluence and le-isure time, has created a ready market for waterfront property. Accordingly, lake-centered subdivisions and developments dot the suburban landscape in many of our major urban areas. Literally thousands of lakes surrounded by homes have materialized during this period of rapid growth. Recently, several "new town" communities have been planned around this lake-centered concept. A lake can be either an asset or a liaoility to a community. A clean, clear, attractively landscaped lake is a definite asset, whereas a weed-choked, foul-smelling mudhole is a distinct liability. The urban environment poses both problems and imaginative opportunities in the development of lakes. Creation of a lake causes changes in all aspects of the environment. Hydrologic systems and ecological patterns are usually most severely altered. The developer should be aware of the potential changes; it is not sufficient merely to build a dam across a stream or to dig a hole in the ground. Development of Gl a successful lake requires careful planning for site selection and design, followed by thorough and cc ntinual management. The purpose of this report is to describe the characteristics of real-estate lakes, to pinpoint potential pmblems, and to suggest possible planning and management guidelines

  11. Floodplain lakes and alluviation cycles of the lower Colorado River

    Science.gov (United States)

    Malmon, D.; Felger, T. J.; Howard, K. A.

    2007-05-01

    The broad valleys along the lower Colorado River contain numerous bodies of still water that provide critical habitat for bird, fish, and other species. This chain of floodplain lakes is an important part of the Pacific Flyway - the major north-south route of travel for migratory birds in the western Hemisphere - and is also used by many resident bird species. In addition, isolated floodplain lakes may provide the only viable habitat for endangered native fish such as the razorback sucker, vulnerable to predation by introduced species in the main stem of the Colorado River. Floodplain lakes typically occupy former channel courses of the river and formed as a result of river meandering or avulsion. Persistent fluvial sediment deposition (aggradation) creates conditions that favor rapid formation and destruction of floodplain lakes, while long term river downcutting (degradation) inhibits their formation and evolution. New radiocarbon dates from wood recovered from drill cores near Topock, AZ indicate that the river aggraded an average of 3 mm/yr in the middle and late Holocene. Aggradational conditions before Hoover Dam was built were associated with rapid channel shifting and frequent lake formation. Lakes had short life spans due to rapid infilling with fine-grained sediment during turbid floods on the unregulated Colorado River. The building of dams and of armored banks had a major impact on floodplain lakes, not only by drowning large portions of the valley beneath reservoirs, but by preventing new lake formation in some areas and accelerating it in others. GIS analyses of three sets of historical maps show that both the number and total area of isolated (i.e., not linked to the main channel by a surface water connection) lakes in the lower Colorado River valley increased between 1902 and the 1950s, and then decreased though the 1970s. River bed degradation below dams inhibits channel shifting and floodplain lake formation, and the capture of fines behind the

  12. Lake variability: Key factors controlling mercury concentrations in New York State fish

    International Nuclear Information System (INIS)

    Simonin, Howard A.; Loukmas, Jefferey J.; Skinner, Lawrence C.; Roy, Karen M.

    2008-01-01

    A 4 year study surveyed 131 lakes across New York State beginning in 2003 to improve our understanding of mercury and gather information from previously untested waters. Our study focused on largemouth and smallmouth bass, walleye and yellow perch, common piscivorous fish shown to accumulate high mercury concentrations and species important to local fisheries. Fish from Adirondack and Catskill Forest Preserve lakes generally had higher mercury concentrations than those from lakes in other areas of the state. Variability between nearby individual lakes was observed, and could be due to differences in water chemistry, lake productivity or the abundance of wetlands in the watershed. We found the following factors impact mercury bioaccumulation: fish length, lake pH, specific conductivity, chlorophyll a, mercury concentration in the water, presence of an outlet dam and amount of contiguous wetlands. - Lake water chemistry variables, dams, and wetlands play major roles in determining fish mercury concentrations

  13. Lakes near the glacier Maliy Azau on the Elbrus (Central Caucasus: dynamics and outbursts

    Directory of Open Access Journals (Sweden)

    M. D. Dokukin

    2016-01-01

    Full Text Available The lake dynamics and the current state of them were analyzed on the basis of interpretation of aerial and satellite images of different years together with results of field surveys. Areas of six lakes existing in different years near the Maliy Azau Glacier had been determined. On August 22, 2011, the maximum area of one of the lakes was equal to 25.5 thousand m2. The first outburst was caused by the landslide deformations of the moraine massif forming a part of the lake basin, while the second one was a result of degradation of the lake ice dam and the water overflow on top of it. The present‑day lake dams (terminal‑moraine ramparts and medial moraine ridges are the result of the Maliy Azau Glacier advance in 1990s. The revealed feature of the lake dynamics on the mountain Elbrus was a drop of the water level and corresponding decrease of the lake areas in winter that was related to existence of the groundwater runoff into fractured volcanic rocks. At present, moraine dams of lakes and areas of the surface water runoff from the lakes are in stable condition due to which there is no threat of a lake outburst. However, the potential threat of outburst still remains because of high seismicity and possible volcanic activity in this region.

  14. LIMNOLOGY, LAKE BASINS, LAKE WATERS

    Directory of Open Access Journals (Sweden)

    Petre GÂŞTESCU

    2009-06-01

    Full Text Available Limnology is a border discipline between geography, hydrology and biology, and is also closely connected with other sciences, from it borrows research methods. Physical limnology (the geography of lakes, studies lake biotopes, and biological limnology (the biology of lakes, studies lake biocoenoses. The father of limnology is the Swiss scientist F.A. Forel, the author of a three-volume entitled Le Leman: monographie limnologique (1892-1904, which focuses on the geology physics, chemistry and biology of lakes. He was also author of the first textbook of limnology, Handbuch der Seenkunde: allgemeine Limnologie,(1901. Since both the lake biotope and its biohydrocoenosis make up a single whole, the lake and lakes, respectively, represent the most typical systems in nature. They could be called limnosystems (lacustrine ecosystems, a microcosm in itself, as the American biologist St.A. Forbes put it (1887.

  15. Analysis of operating criteria: Multiple lakes at Voyageurs National Park

    International Nuclear Information System (INIS)

    Flug, M.; Kallemeyn, L.W.

    1993-01-01

    An overview of lake and river regulation at Voyageurs National Park, which resides on the Minnesota-Ontario border, is given to demonstrate how water policy agreements can work. In 1905 the United States and Canada authorized private dams with turbines on the Rainy River. The International Joint Commission regulates these dams. The National Park Service is mandated to preserve the natural environment for future generations. State, private, and public sector interests are tourism, flood protection, the pulp and paper industry, native wild rice growth; etc. Rule curves for regulating reservoirs have changed and committee with broad representation is cooperating to better manage the waters of Namakan Reservoir and Rainy Lake

  16. Effects of dam-induced landscape fragmentation on amazonian ant-plant mutualistic networks.

    Science.gov (United States)

    Emer, Carine; Venticinque, Eduardo Martins; Fonseca, Carlos Roberto

    2013-08-01

    Mutualistic networks are critical to biological diversity maintenance; however, their structures and functionality may be threatened by a swiftly changing world. In the Amazon, the increasing number of dams poses a large threat to biological diversity because they greatly alter and fragment the surrounding landscape. Tight coevolutionary interactions typical of tropical forests, such as the ant-myrmecophyte mutualism, where the myrmecophyte plants provide domatia nesting space to their symbiotic ants, may be jeopardized by the landscape changes caused by dams. We analyzed 31 ant-myrmecophyte mutualistic networks in undisturbed and disturbed sites surrounding Balbina, the largest Central Amazonian dam. We tested how ant-myrmecophyte networks differ among dam-induced islands, lake edges, and undisturbed forests in terms of species richness, composition, structure, and robustness (number of species remaining in the network after partner extinctions). We also tested how landscape configuration in terms of area, isolation, shape, and neighborhood alters the structure of the ant-myrmecophyte networks on islands. Ant-myrmecophytic networks were highly compartmentalized in undisturbed forests, and the compartments had few strongly connected mutualistic partners. In contrast, networks at lake edges and on islands were not compartmentalized and were negatively affected by island area and isolation in terms of species richness, density, and composition. Habitat loss and fragmentation led to coextinction cascades that contributed to the elimination of entire ant-plant compartments. Furthermore, many myrmecophytic plants in disturbed sites lost their mutualistic ant partners or were colonized by opportunistic, nonspecialized ants. Robustness of ant-myrmecophyte networks on islands was lower than robustness near lake edges and in undisturbed forest and was particularly susceptible to the extinction of plants. Beyond the immediate habitat loss caused by the building of large dams

  17. Contaminant Monitoring Strategy for Henrys Lake, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    John S. Irving; R. P. Breckenridge

    1992-12-01

    Henrys Lake, located in southeastern Idaho, is a large, shallow lake (6,600 acres, {approx} 17.1 feet maximum depth) located at 6,472 feet elevation in Fremont Co., Idaho at the headwaters of the Henrys Fork of the Snake River. The upper watershed is comprised of high mountains of the Targhee National Forest and the lakeshore is surrounded by extensive flats and wetlands, which are mostly privately owned. The lake has been dammed since 1922, and the upper 12 feet of the lake waters are allocated for downriver use. Henrys Lake is a naturally productive lake supporting a nationally recognized ''Blue Ribbon'' trout fishery. There is concern that increasing housing development and cattle grazing may accelerate eutrophication and result in winter and early spring fish kills. There has not been a recent thorough assessment of lake water quality. However, the Department of Environmental Quality (DEQ) is currently conducting a study of water quality on Henrys Lake and tributary streams. Septic systems and lawn runoff from housing developments on the north, west, and southwest shores could potentially contribute to the nutrient enrichment of the lake. Many houses are on steep hillsides where runoff from lawns, driveways, etc. drain into wetland flats along the lake or directly into the lake. In addition, seepage from septic systems (drainfields) drain directly into the wetlands enter groundwater areas that seep into the lake. Cattle grazing along the lake margin, riparian areas, and uplands is likely accelerating erosion and nutrient enrichment. Also, cattle grazing along riparian areas likely adds to nutrient enrichment of the lake through subsurface flow and direct runoff. Stream bank and lakeshore erosion may also accelerate eutrophication by increasing the sedimentation of the lake. Approximately nine streams feed the lake (see map), but flows are often severely reduced or completely eliminated due to irrigation diversion. In addition, subsurface

  18. USGS Activities at Lake Roosevelt and the Upper Columbia River

    Science.gov (United States)

    Barton, Cynthia; Turney, Gary L.

    2010-01-01

    Lake Roosevelt (Franklin D. Roosevelt Lake) is the impoundment of the upper Columbia River behind Grand Coulee Dam, and is the largest reservoir within the Bureau of Reclamation's Columbia Basin Project (CBP). The reservoir is located in northeastern Washington, and stretches 151 miles from Grand Coulee Dam north to the Canadian border. The 15-20 miles of the Columbia River downstream of the border are riverine and are under small backwater effects from the dam. Grand Coulee Dam is located on the mainstem of the Columbia River about 90 miles northwest of Spokane. Since the late 1980s, trace-element contamination has been known to be widely present in Lake Roosevelt. Trace elements of concern include arsenic, cadmium, copper, lead, mercury, and zinc. Contaminated sediment carried by the Columbia River is the primary source of the widespread occurrence of trace-element enrichment present in Lake Roosevelt. In 2001, the U.S. Environmental Protection Agency (EPA) initiated a preliminary assessment of environmental contamination of the Lake Roosevelt area (also referred to as Upper Columbia River, UCR site, or UCR/LR site) and has subsequently begun remedial investigations of the UCR site.

  19. Water temperature effects from simulated changes to dam operations and structures in the Middle and South Santiam Rivers, Oregon

    Science.gov (United States)

    Buccola, Norman L.

    2017-05-31

    Green Peter and Foster Dams on the Middle and South Santiam Rivers, Oregon, have altered the annual downstream water temperature profile (cycle). Operation of the dams has resulted in cooler summer releases and warmer autumn releases relative to pre-dam conditions, and that alteration can hinder recovery of various life stages of threatened spring-run Chinook salmon (Oncorhyncus tshawytscha) and winter steelhead (O. mykiss). Lake level management and the use of multiple outlets from varying depths at the dams can enable the maintenance of a temperature regime more closely resembling that in which the fish evolved by releasing warm surface water during summer and cooler, deeper water in the autumn. At Green Peter and Foster Dams, the outlet configuration is such that temperature control is often limited by hydropower production at the dams. Previously calibrated CE-QUAL-W2 water temperature models of Green Peter and Foster Lakes were used to simulate the downstream thermal effects from hypothetical structures and modified operations at the dams. Scenarios with no minimum power production requirements allowed some releases through shallower and deeper outlets (summer and autumn) to achieve better temperature control throughout the year and less year-to-year variability in autumn release temperatures. Scenarios including a hypothetical outlet floating 1 meter below the lake surface resulted in greater ability to release warm water during summer compared to existing structures. Later in Autumn (October 15–December 31), a limited amount of temperature control was realized downstream from Foster Dam by scenarios limited to operational changes with existing structures, resulting in 15-day averages within 1.0 degree Celsius of current operations.

  20. ANALYSIS OF JURE LANDSLIDE DAM, SINDHUPALCHOWK USING GIS AND REMOTE SENSING

    Directory of Open Access Journals (Sweden)

    T. D. Acharya

    2016-06-01

    Full Text Available On 2nd August 2014, a rainfall-induced massive landslide hit Jure village, Sindhupalchowk killing 156 people at a distance of 70 km North-East of Kathmandu, Nepal. The landslide was a typical slope failure with massive rock fragments, sand and soil. A total of estimated 6 million cubic meters debris raised more than 100 m from the water level and affected opposite side of the bank. The landslide blocked the Sunkoshi River completely forming an estimated 8 million cubic meter lake of 3km length and 300-350m width upstream. It took nearly 12 hour to fill the lake and overflow the debris dam. The lake affected five Village Development Committees (VDC including highway, school, health post, postal service, police station, VDC office and temple upstream. The bottom of the dam was composed of highly cemented material and the derbies affected Sunkoshi hydropower downstream. Moreover, it caused the potential threat of Lake Outburst Flood. The lake was released by blasting off part of the landslide blockade and facilitated release of water from the lake. With the help of Remote Sensing (RS, series satellite images were used to identified, compared with previous state and quick estimation of potential treat was analysed. Using geographic information System (GIS technology, estimation of volume, affected households, service centres, parcels etc. in the area was possible. In such hilly regions where disaster are very frequent, using GIS and RS technology comes very handy for immediate planning and response.

  1. Basic limnology of fifty-one lakes in Costa Rica.

    Science.gov (United States)

    Haberyan, Kurt A; Horn, Sally P; Umaña, Gerardo

    2003-03-01

    We visited 51 lakes in Costa Rica as part of a broad-based survey to document their physical and chemical characteristics and how these relate to the mode of formation and geographical distribution of the lakes. The four oxbow lakes were low in elevation and tended to be turbid, high in conductivity and CO2, but low in dissolved O2; one of these, L. Gandoca, had a hypolimnion essentially composed of sea water. These were similar to the four wetland lakes, but the latter instead had low conductivities and pH, and turbidity was often due to tannins rather than suspended sediments. The thirteen artificial lakes formed a very heterogenous group, whose features varied depending on local factors. The thirteen lakes dammed by landslides, lava flows, or lahars occurred in areas with steep slopes, and were more likely to be stratified than most other types of lakes. The eight lakes that occupy volcanic craters tended to be deep, stratified, clear, and cool; two of these, L. Hule and L. Río Cuarto, appeared to be oligomictic (tending toward meromictic). The nine glacial lakes, all located above 3440 m elevation near Cerro Chirripó, were clear, cold, dilute, and are probably polymictic. Cluster analysis resulted in three significant groups of lakes. Cluster 1 included four calcium-rich lakes (average 48 mg l-1), Cluster 2 included fourteen lakes with more Si than Ca+2 and higher Cl- than the other clusters, and Cluster 3 included the remaining thirty-three lakes that were generally less concentrated. Each cluster included lakes of various origins located in different geographical regions; these data indicate that, apart from the high-altitude glacial lakes and lakes in the Miravalles area, similarity in lake chemistry is independent of lake distribution.

  2. Morphodynamics of Travertine Dam/Waterfall Growth due to the Interaction of Biological Activity, Water Flow and Limestone Emplacement

    Science.gov (United States)

    Izumi, N.; Parker, G.

    2012-12-01

    Plitvice Lakes in Croatia are characterized by a step-like train of lakes and waterfalls. The waterfalls are located at the crests of naturally-emplaced dams. The top of each dam grows upward at the rate of a few millimeters per year. It is thought that the upward growth of these dams is caused by the interaction of water flow and biological activity, resulting in the precipitation of dissolved limestone. Dam evolution is initiated by the growth of mosses that favor swift, shallow water. Bacteria that inhabit the roots of the moss excrete solid limestone (travertine) from the water. The limestone fossilizes the moss, and then more moss grows on top of the travertine deposit. In this way, the natural dam can grow over to 10 m high, impounding the water behind it to form a lake. We propose a simple model to explain the formation of natural limestone dams by the interaction between water flow and biologically-mediated travertine deposition. We assume for simplicity that light is the only factor determining the growth of moss, which is then colonized by travertine-emplacing bacteria. We also assume that the water is saturated with dissolved limestone, so that the process is not limited by limestone availability. Photosynthesis, and thus the growth rate of moss are crudely approximated as decreasing linearly with depth. We employ the shallow water equations to describe water flow over the dam. In order to obtain a profile of permanent form for a dam migrating upward and downstream at constant speed, we solve the problem in a moving coordinate system. When water flows over the dam, it is accelerated in the streamwise direction, and the water surface forms a backwater curve. The flow regime changes from Froude-subcritical to Froude-supercritical at a point slightly downstream of the crest of the dam. Farther downstream, the flow attains a threshold velocity beyond which moss is detached. This threshold point defines the downstream end of the active part of the dam. The

  3. Preliminary assessment of the impact of fluctuating water levels on northern pike in Reindeer Lake

    International Nuclear Information System (INIS)

    Chen, M.

    1993-03-01

    Reindeer Lake in north eastern Saskatchewan regulates water levels for the Island Falls hydroelectric power plant. Since inception of the Whitesand Dam on the lake, there have been concerns that fluctuating water levels could be adversely impacting the habitat and population of northern pike in the lake. The extent of water level fluctuations during the pike spawning period of Reindeer Lake and its effect on spawning success was investigated. Since construction of the Whitesand Dam in 1942 Reindeer Lake water levels have averaged ca 1.71 m higher than had the dam not existed, creating ca 430 km 2 of new surface area. Much of this area is shallow water and prone to growth of aquatic vegetation, which is suitable spawning and nursery habitat for northern pike. Annual and periodic water level fluctuations of Reindeer Lake have been higher than under natural conditions. During northern pike spawning and nursing periods, water levels in the lake have generally increased, in 60 out of 64 y. It is concluded that operation of the dam has not caused any direct negative impacts on the northern pike habitat in the lake. 2 refs., 4 figs., 4 tabs

  4. Water temperature effects from simulated dam operations and structures in the Middle Fork Willamette River, western Oregon

    Science.gov (United States)

    Buccola, Norman L.; Turner, Daniel F.; Rounds, Stewart A.

    2016-09-14

    Significant FindingsStreamflow and water temperature in the Middle Fork Willamette River (MFWR), western Oregon, have been regulated and altered since the construction of Lookout Point, Dexter, and Hills Creek Dams in 1954 and 1961, respectively. Each year, summer releases from the dams typically are cooler than pre-dam conditions, with the reverse (warmer than pre-dam conditions) occurring in autumn. This pattern has been detrimental to habitat of endangered Upper Willamette River (UWR) Chinook salmon (Oncorhynchus tshawytscha) and UWR winter steelhead (O. mykiss) throughout multiple life stages. In this study, scenarios testing different dam-operation strategies and hypothetical dam-outlet structures were simulated using CE-QUAL-W2 hydrodynamic/temperature models of the MFWR system from Hills Creek Lake (HCR) to Lookout Point (LOP) and Dexter (DEX) Lakes to explore and understand the efficacy of potential flow and temperature mitigation options.Model scenarios were run in constructed wet, normal, and dry hydrologic calendar years, and designed to minimize the effects of Hills Creek and Lookout Point Dams on river temperature by prioritizing warmer lake surface releases in May–August and cooler, deep releases in September–December. Operational scenarios consisted of a range of modified release rate rules, relaxation of power-generation constraints, variations in the timing of refill and drawdown, and maintenance of different summer maximum lake levels at HCR and LOP. Structural scenarios included various combinations of hypothetical floating outlets near the lake surface and hypothetical new outlets at depth. Scenario results were compared to scenarios using existing operational rules that give temperature management some priority (Base), scenarios using pre-2012 operational rules that prioritized power generation over temperature management (NoBlend), and estimated temperatures from a without-dams condition (WoDams).Results of the tested model scenarios led

  5. Simulating potential structural and operational changes for Detroit Dam on the North Santiam River, Oregon, for downstream temperature management

    Science.gov (United States)

    Buccola, Norman L.; Rounds, Stewart A.; Sullivan, Annett B.; Risley, John C.

    2012-01-01

    Detroit Dam was constructed in 1953 on the North Santiam River in western Oregon and resulted in the formation of Detroit Lake. With a full-pool storage volume of 455,100 acre-feet and a dam height of 463 feet, Detroit Lake is one of the largest and most important reservoirs in the Willamette River basin in terms of power generation, recreation, and water storage and releases. The U.S. Army Corps of Engineers operates Detroit Dam as part of a system of 13 reservoirs in the Willamette Project to meet multiple goals, which include flood-damage protection, power generation, downstream navigation, recreation, and irrigation. A distinct cycle in water temperature occurs in Detroit Lake as spring and summer heating through solar radiation creates a warm layer of water near the surface and isolates cold water below. Controlling the temperature of releases from Detroit Dam, therefore, is highly dependent on the location, characteristics, and usage of the dam's outlet structures. Prior to operational changes in 2007, Detroit Dam had a well-documented effect on downstream water temperature that was problematic for endangered salmonid fish species, releasing water that was too cold in midsummer and too warm in autumn. This unnatural seasonal temperature pattern caused problems in the timing of fish migration, spawning, and emergence. In this study, an existing calibrated 2-dimensional hydrodynamic water-quality model [CE-QUAL-W2] of Detroit Lake was used to determine how changes in dam operation or changes to the structural release points of Detroit Dam might affect downstream water temperatures under a range of historical hydrologic and meteorological conditions. The results from a subset of the Detroit Lake model scenarios then were used as forcing conditions for downstream CE-QUAL-W2 models of Big Cliff Reservoir (the small reregulating reservoir just downstream of Detroit Dam) and the North Santiam and Santiam Rivers. Many combinations of environmental, operational, and

  6. Dams and Obstructions along Iowa's Canoe Routes

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — This dataset represents obstruction to canoe and boat users of the canoe routes of Iowa. This may represent actual dams, rock dams (natural or man made), large...

  7. Douglas County Dam Breach Inundation Areas

    Data.gov (United States)

    Kansas Data Access and Support Center — Dam breach analysis provides a prediction of the extent and timing of flooding from a catastrophic breach of the dams. These results are sufficient for developing...

  8. Simulation of Breach Outflow for Earthfill Dam

    International Nuclear Information System (INIS)

    Razad, Azwin Zailti Abdul; Muda, Rahsidi Sabri; Sidek, Lariyah Mohd; Azia, Intan Shafilah Abdul; Mansor, Faezah Hanum; Yalit, Ruzaimei

    2013-01-01

    Dams have been built for many reasons such as irrigation, hydropower, flood mitigation, and water supply to support development for the benefit of human. However, the huge amount of water stored behind the dam can seriously pose adverse impacts to the downstream community should it be released due to unwanted dam break event. To minimise the potential loss of lives and property damages, a workable Emergency Response Plan is required to be developed. As part of a responsible dam owner and operator, TNB initiated a study on dam breach modelling for Cameron Highlands Hydroelectric Scheme to simulate the potential dam breach for Jor Dam. Prediction of dam breach parameters using the empirical equations of Froehlich and Macdonal-Langridge-Monopolis formed the basis of the modelling, coupled with MIKE 11 software to obtain the breach outflow due to Probable Maximum Flood (PMF). This paper will therefore discuss the model setup, simulation procedure and comparison of the prediction with existing equations.

  9. Technical bulletin : structural considerations for dam safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This technical bulletin discussed issues related to the safety assessment of concrete water-retaining structures and timber dams. Structures reviewed in the paper included gravity dams; buttress dams; arch dams; spillway structures; intake structures; power plants; roller compacted concrete dams; and timber dams. A variety of issues related to the loss of cohesive bond and discontinuities in bedrock foundations were reviewed with reference to issues related to compressive strength, tensile strength, and shear strength. Static failure modes and failure mechanisms related to dam failures were also described. Visual indicators for potential failures include abutment and foundation movement, seepage, and structure movements. Loading combinations were discussed, and performance indicators for gravity dams were provided. Methods of analysis for considering load characteristics, structure types and geological conditions were also discussed. Modelling techniques for finite element analysis were also included. 16 refs., 3 tabs., 5 figs.

  10. Investigation of changes to the operation of Keenleyside Dam to reduce supersaturation of dissolved gases downstream

    International Nuclear Information System (INIS)

    Nunn, J.O.H.; Fidler, L.E.; Northcott, P.

    1993-01-01

    Keenlyside Dam is located on the Columbia River in southeast British Columbia. It impounds Arrow Lakes Reservoir, which has a live storage of 8.8 billion m 3 . The dam is used for flood control and to increase power generation in the USA. Recent field measurements have shown that the current operation of the dam often creates high levels of total gas pressure (TGP) downstream of the dam, with supersaturation levels occasionally reaching as high as 140%. It appeared that these increased levels were associated with the use of the spillway. High levels of dissolved gases may have adverse effects on aquatic life. Therefore, a comprehensive study was initiated to investigate ways of reducing TGP levels. The discharge facilities at the dam are described, along with the effects of dissolved gas supersaturation on fish. Current studies include measurement of field TGP levels, development of a model to predict TGP levels for different modes of operation of the discharge facilities, assessing the effects of TGP on different fish species at different life stages, field testing of the discharge facilities, and assessment of long-term impacts of various operating alternatives on the dam structures and equipment. Preliminary results indicate that the north low-level ports of the spillway increase the TGP level significantly less than the other two components of the discharge facilities. Current operating practice therefore maximizes use of the north ports within current operating limits. 9 refs., 4 figs

  11. Assessment of glacial lake development and prospects of outburst susceptibility: Chamlang South Glacier, eastern Nepal Himalaya

    Directory of Open Access Journals (Sweden)

    Damodar Lamsal

    2016-01-01

    Full Text Available Chamlang South Tsho has been identified as one of the six high-priority glacial lakes in terms of glacial lake outburst flood (GLOF danger in Nepal Himalaya, despite the fact that no detailed investigations of the lake had been hitherto undertaken. We conducted detailed mapping of the lake and its surroundings along with field surveys in October 2009 to determine the developmental history of Chamlang South Tsho and to assess its potential for GLOF. The lake expanded rapidly between 1964 (0.04 km2 and 2000 (0.86 km2 and has been stable ever since. Future lake expansion is improbable as its sides are confined by relatively stable landforms. The lake is 87-m deep with a water volume of approximately 34.9–35.6 × 106 m3. Hanging glaciers on the steep surrounding mountain slopes and prominent seepage water in the terminal moraine dam could be potential triggers for a future outburst flood. Additionally, the debris-covered dead-ice dam, which is higher than the lake water level, is narrow and low; therefore, it could be overtopped easily by surge waves. Furthermore, the pronounced difference in elevation between the lake and the base of the terminal moraine dam makes the lake susceptible for a large flood.

  12. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Bar Dams AGENCY: Tennessee Valley Authority. ACTION: Issuance of Record of Decision. SUMMARY: This... the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of... Loudoun, Tellico, and Watts Bar Dams was published in the Federal Register on May 31, 2013. This...

  13. WinDAM C earthen embankment internal erosion analysis software

    Science.gov (United States)

    Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...

  14. EVALUASI KEAMANAN DAM JATILUHUR BERBASIS INDEKS RESIKO

    Directory of Open Access Journals (Sweden)

    Avazbek Ishbaev

    2014-12-01

    Full Text Available The dams have very important roles to agricultural activities. Especially, West Java with 240,000 hectares of agricultural land, needs a good dam structure that can be used sustainably. Jatiluhur dam in Purwakarta, West Java is one of big dams in Indonesia which has important rules not only for Purwakarta but also for Jakarta, Karawang and Bekasi residents. A study and observation about safety and dam stability is needed to prevent any damage. The purpose of this research were to identify parameters that influenced dam safety and to evaluate dam reliability based on index tools. Analysis was done using risk index tools. The result showed that the condition of the dam of Jatiluhur is still satisfied with indicators, "Idam"-750. The total index risk was 127.22 and the safety factor was 83.04 out of 100. Therefore, Jatiluhur dam could be classified as safe and no need for particular treatments. Jatiluhur dam can be operated in normal condition or abnormal condition with periodic monitoring. Keywords: dam safety, evaluation, Jatiluhur Dam, risk index tools

  15. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The paper reports on the conclusions of decennial and annual inspections of French dams. Dams surveillance is performed by the operators and consists in visual examinations and measurements. Concrete dams, in particular, always have more or less developed fissures with water sweating threw the concrete mass or the foundations. Old concrete often show low swelling phenomena which are measured too. (J.S.)

  16. 78 FR 62627 - Sam Rayburn Dam Rate

    Science.gov (United States)

    2013-10-22

    ..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No... Schedule SRD-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative... ADMINISTRATION RATE SCHEDULE SRD-13 \\1\\ WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN DAM...

  17. Example Emergency Plan for Blue Marsh Dam and Lake.

    Science.gov (United States)

    1983-08-01

    of 10 to 20 feet. The area is designated as seismic zone 2. d. Climate The project area is located in the temperate northeast Atlantic Coast climatic ...Hydrology and H ydr- aulics littncl shallI annia II Ai rekt a thorough inspection of all nriechani i al. electr-ical and other eq11inipmIent pr nent to

  18. Zoobenthic fauna and seasonal changes of mamasin dam lake ...

    African Journals Online (AJOL)

    STORAGESEVER

    2009-09-15

    Sep 15, 2009 ... Psammoryctides deserticula (Grimm, 1877). 14. Procladius (Holotanypus) sp. 15. Chironomus plumosus (Linnaeus, 1758). 16. C. anthracinus (Zetterstedt, 1860). Insecta. Chironomidae. 17. Polypedilum nubeculosum (Meigen, 1804). Figure 2. Average numbers (BS/m2) of chironomidae, oligochaeta and ...

  19. Determination of trophic situation of Sarimsakli Dam Lake (Kayseri ...

    African Journals Online (AJOL)

    PRECIOUS

    2009-11-16

    Nov 16, 2009 ... density. This may show that Rotifer group inclu- des species with a high tolerance against variable temperatures. Minimum dissolved oxygen level of water should not be below 5.0 mg/l to sustain the aquatic life under aerobic conditions in freshwater ecosys- tems (Gülle, 1999). This value was not found to.

  20. Environmental effects of the Big Rapids dam remnant removal, Big Rapids, Michigan, 2000-02

    Science.gov (United States)

    Healy, Denis F.; Rheaume, Stephen J.; Simpson, J. Alan

    2003-01-01

    The U.S. Geological Survey (USGS), in cooperation with the city of Big Rapids, investigated the environmental effects of removal of a dam-foundation remnant and downstream cofferdam from the Muskegon River in Big Rapids, Mich. The USGS applied a multidiscipline approach, which determined the water quality, sediment character, and stream habitat before and after dam removal. Continuous water-quality data and discrete water-quality samples were collected, the movement of suspended and bed sediment were measured, changes in stream habitat were assessed, and streambed elevations were surveyed. Analyses of water upstream and downstream from the dam showed that the dam-foundation remnant did not affect water quality. Dissolved-oxygen concentrations downstream from the dam remnant were depressed for a short period (days) during the beginning of the dam removal, in part because of that removal effort. Sediment transport from July 2000 through March 2002 was 13,800 cubic yards more at the downstream site than the upstream site. This increase in sediment represents the remobilized sediment upstream from the dam, bank erosion when the impoundment was lowered, and contributions from small tributaries between the sites. Five habitat reaches were monitored before and after dam-remnant removal. The reaches consisted of a reference reach (A), upstream from the effects of the impoundment; the impoundment (B); and three sites below the impoundment where habitat changes were expected (C, D, and E, in downstream order). Stream-habitat assessment reaches varied in their responses to the dam-remnant removal. Reference reach A was not affected. In impoundment reach B, Great Lakes and Environmental Assessment Section (GLEAS) Procedure 51 ratings went from fair to excellent. For the three downstream reaches, reach C underwent slight habitat degradation, but ratings remained good; reach D underwent slight habitat degradation with ratings changing from excellent to good; and, in an area

  1. Dam's design continues throughout construction

    Energy Technology Data Exchange (ETDEWEB)

    Lara E, R; Wulff, J G

    1979-11-01

    In spite of adverse site conditions, Arenal dam in Costa Rica was completed a year ahead of schedule. Historical data on local earthquake activity which was available in unusual detail reduced some uncertainties in design information. Other uncertainties regarding the complex foundation conditions were resolved as excavation and construction progressed.

  2. Prediction of Microcystis Blooms Based on TN:TP Ratio and Lake Origin

    Directory of Open Access Journals (Sweden)

    Yoshimasa Amano

    2008-01-01

    Full Text Available We evaluated the relationship between TN:TP ratio and Microcystis growth via a database that includes worldwide lakes based on four types of lake origin (dammed, tectonic, coastal, and volcanic lakes. We used microcosm and mesocosm for the nutrient elution tests with lake water and four kinds of sediment (nontreated, MgO sprinkling treated, dissolved air flotation [DAF] treated, and combined treated sediment in order to control TN:TP ratio and to suppress Microcystis growth. Microcystis growth was related to TN:TP ratio, with the maximum value at an optimum TN:TP ratio and the minimum values when the TN:TP ratios reached to 0 or ∞. The kurtosis of the distribution curve varied with the type of lake origin; the lowest kurtosis was found in dammed lakes, while the highest was found in volcanic lakes. The lake trophic state could affect the change in the kurtosis, providing much lower kurtosis at eutrophic lakes (dammed lakes than that at oligotrophic lakes (volcanic lakes. The relationship between TN:TP ratio and Microcystis growth could be explained by the nutrient elution tests under controlled TN:TP ratios through the various sediment treatments. A significant suppression of Microcystis growth of 70% could be achieved when the TN:TP ratios exceeded 21. Lake origin could be regarded as an index including morphological and geographical factors, and controlling the trophic state in lakes. The origin rather than trophic state for lakes could be considered as an important factor of TN:TP influences on Microcystis growth.

  3. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  4. Forensic geotechniques in the re-evaluation of Ruskin Dam foundation shear strength

    Energy Technology Data Exchange (ETDEWEB)

    Rigbey, S.; Lawrence, M.S. [BC Hydro, Vancouver, BC (Canada); Daw, D. [Hatch Energy, Vancouver, BC (Canada)

    2008-07-01

    The 59 metre high Ruskin Dam was constructed in the 1930s at the south end of Hayward Lake in British Columbia. The concrete gravity dam is founded nearly entirely on rock. Although the dam has performed satisfactorily since its construction, it is categorized as a very high consequence structure based on criteria established in British Columbia Dam Safety Regulations. It was considered to have insufficient withstand for Maximum Designs earthquake (MDE). Stability analyses performed in the late 1990's relied on simplified geometry with presumed planar concrete-rock interfaces, and relatively conservative estimates of sliding resistance and no consideration for canyon geometry. The analyses suggested that the concrete base may need to be anchored to the rock foundation to achieve satisfactory seismic withstand. The sliding resistance of the dam's foundation had to be assessed in order to determine if remedial measures were needed to meet updated design criteria. A reliable 3-dimensional topographic model for the Ruskin Dam was created in 2006 following a review of construction records and drilling investigation programs. Irregularities were found in the rock concrete contact, and the canyon walls showed a positive downstream converging geometry. The potential critical failure modes were determined along the contact, along the potential subhorizontal joints within the foundation, and through a broken rock mass under the contact. Roughness for each selected case was evaluated and the Barton-Bandis basic friction angle for the rock was determined by laboratory testing. The resulting shear strengths were used in a series of dynamic stability analyses which revealed that the body of the dam would be stable in the updated design earthquake. The 3-D geotechnical model was the key to the new analyses, which showed that the abutment wedges are stable under seismic loading. As such, costly base anchoring of the dam was deemed unnecessary. 6 refs., 6 tabs., 12 figs.

  5. Assessing Risks of Mine Tailing Dam Failures

    Science.gov (United States)

    Concha Larrauri, P.; Lall, U.

    2017-12-01

    The consequences of tailings dam failures can be catastrophic for communities and ecosystems in the vicinity of the dams. The failure of the Fundão tailings dam at the Samarco mine in 2015 killed 19 people with severe consequences for the environment. The financial and legal consequences of a tailings dam failure can also be significant for the mining companies. For the Fundão tailings dam, the company had to pay 6 billion dollars in fines and twenty-one executives were charged with qualified murder. There are tenths of thousands of active, inactive, and abandoned tailings dams in the world and there is a need to better understand the hazards posed by these structures to downstream populations and ecosystems. A challenge to assess the risks of tailings dams in a large scale is that many of them are not registered in publicly available databases and there is little information about their current physical state. Additionally, hazard classifications of tailings dams - common in many countries- tend to be subjective, include vague parameter definitions, and are not always updated over time. Here we present a simple methodology to assess and rank the exposure to tailings dams using ArcGIS that removes subjective interpretations. The method uses basic information such as current dam height, storage volume, topography, population, land use, and hydrological data. A hazard rating risk was developed to compare the potential extent of the damage across dams. This assessment provides a general overview of what in the vicinity of the tailings dams could be affected in case of a failure and a way to rank tailings dams that is directly linked to the exposure at any given time. One hundred tailings dams in Minas Gerais, Brazil were used for the test case. This ranking approach could inform the risk management strategy of the tailings dams within a company, and when disclosed, it could enable shareholders and the communities to make decisions on the risks they are taking.

  6. Research on Safety Factor of Dam Slope of High Embankment Dam under Seismic Condition

    Directory of Open Access Journals (Sweden)

    Li Bin

    2015-01-01

    Full Text Available With the constant development of construction technology of embankment dam, the constructed embankment dam becomes higher and higher, and the embankment dam with its height over 200m will always adopt the current design criteria of embankment dam only suitable for the construction of embankment dam lower than 200m in height. So the design criteria of high embankment dam shall be improved. We shall calculate the stability and safety factors of dam slope of high embankment dam under different dam height, slope ratio and different seismic intensity based on ratio of safety margin, and clarify the change rules of stability and safety factors of dam slope of high embankment dam with its height over 200m. We calculate the ratio of safety margin of traditional and reliable method by taking the stable, allowable and reliability index 4.2 of dam slope of high embankment dam with its height over 200m as the standard value, and conduct linear regression for both. As a result, the conditions, where 1.3 is considered as the stability and safety factors of dam slope of high embankment dam with its height over 200m under seismic condition and 4.2 as the allowable and reliability index, are under the same risk control level.

  7. Mine tailings dams: Characteristics, failure, environmental impacts, and remediation

    International Nuclear Information System (INIS)

    Kossoff, D.; Dubbin, W.E.; Alfredsson, M.; Edwards, S.J.; Macklin, M.G.; Hudson-Edwards, K.A.

    2014-01-01

    On a global scale demand for the products of the extractive industries is ever increasing. Extraction of the targeted resource results in the concurrent production of a significant volume of waste material, including tailings, which are mixtures of crushed rock and processing fluids from mills, washeries or concentrators that remain after the extraction of economic metals, minerals, mineral fuels or coal. The volume of tailings is normally far in excess of the liberated resource, and the tailings often contain potentially hazardous contaminants. A priority for a reasonable and responsible mining organization must be to proactively isolate the tailings so as to forestall them from entering groundwaters, rivers, lakes and the wind. There is ample evidence that, should such tailings enter these environments they may contaminate food chains and drinking water. Furthermore, the tailings undergo physical and chemical change after they have been deposited. The chemical changes are most often a function of exposure to atmospheric oxidation and tends to make previously, perhaps safely held contaminants mobile and available. If the tailings are stored under water, contact with the atmosphere is substantially reduced, thereby forestalling oxygen-mediated chemical change. It is therefore accepted practice for tailings to be stored in isolated impoundments under water and behind dams. However, these dams frequently fail, releasing enormous quantities of tailings into river catchments. These accidents pose a serious threat to animal and human health and are of concern for extractive industries and the wider community. It is therefore of importance to understand the nature of the material held within these dams, what best safety practice is for these structures and, should the worst happen, what adverse effects such accidents might have on the wider environment and how these might be mitigated. This paper reviews these factors, covering the characteristics, types and magnitudes

  8. Red Indian Lake fishway, an innovative design for difficult conditions

    International Nuclear Information System (INIS)

    Helwig, P.C.; Goosney, R.; Smith, W.L.

    1993-01-01

    Red Indian Lake Dam is a large concrete gravity structure, 10-12 m high and 245 m long, in the Exploits River watershed in Newfoundland. The watershed is an ideal habitat for production of Atlantic salmon. Since 1985, the watershed above the dam has undergone an extensive stocking program to optimize the salmon production capacity of the upper reaches of the system. To sustain this development, a fishway was needed to permit returning salmon to bypass Red Indian Lake Dam, the last remaining migrational barrier. The difficulties with installing a fishway at the dam site included extreme variation in upstream water levels, the need to retrofit a fishway into an existing structure, and the necessity to attract fish into the fishway in competition with other flows from power plant, spillway, or waterfall. After examining several design approaches, an innovative design was developed incorporating two separate but interrelated flow ways: one to handle attraction water and the other for transportation water. The latter passage leads to a trap at the upper end of the fishway from which salmon are hoisted via a hopper/monorail system across the dam and into the lake. Construction of the fishway was staged over four phases between December 1985 and December 1988. 3 refs., 1 fig

  9. New guidelines for dam safety classification

    International Nuclear Information System (INIS)

    Dascal, O.

    1999-01-01

    Elements are outlined of recommended new guidelines for safety classification of dams. Arguments are provided for the view that dam classification systems should require more than one system as follows: (a) classification for selection of design criteria, operation procedures and emergency measures plans, based on potential consequences of a dam failure - the hazard classification of water retaining structures; (b) classification for establishment of surveillance activities and for safety evaluation of dams, based on the probability and consequences of failure - the risk classification of water retaining structures; and (c) classification for establishment of water management plans, for safety evaluation of the entire project, for preparation of emergency measures plans, for definition of the frequency and extent of maintenance operations, and for evaluation of changes and modifications required - the hazard classification of the project. The hazard classification of the dam considers, as consequence, mainly the loss of lives or persons in jeopardy and the property damages to third parties. Difficulties in determining the risk classification of the dam lie in the fact that no tool exists to evaluate the probability of the dam's failure. To overcome this, the probability of failure can be substituted for by a set of dam characteristics that express the failure potential of the dam and its foundation. The hazard classification of the entire project is based on the probable consequences of dam failure influencing: loss of life, persons in jeopardy, property and environmental damage. The classification scheme is illustrated for dam threatening events such as earthquakes and floods. 17 refs., 5 tabs

  10. Assessment of hydrological changes in the Nile River due to the construction of Renaissance Dam in Ethiopia

    Directory of Open Access Journals (Sweden)

    Mohammed El Bastawesy

    2015-06-01

    Full Text Available This paper assesses impact of the Renaissance Dam on Ethiopia; on the Nile discharge ultimately reaches Egypt downstream. The Landsat-8 satellite images of 2013 were obtained and interpreted to identify locations for the construction sites for the Renaissance Dam. Then the Shuttle Radar Topography Mission (SRTM data were obtained and processed to create a digital elevation model (DEM for the Blue Nile upstream areas that will be submerged. Different scenarios for the dams’ heights and resulting storages were simulated to estimate the resulting abstraction of the Blue Nile flows until completion of the project and the annual losses due to evaporation thereafter. The current site (506 m asl for the Renaissance Dam allows the creation of a 100 m deep reservoir with a total storage of 17.5 km3; overflows will occur at that lake’s level (606 m asl from the north western part of the developed lake into Rosaires downstream. Construction of the spillway dam to control the overflow area can allow the creation of a 180 m deep lake that store up to 173 km3 in a lake that will cover 3130 km2. The analysis of Tropical Rainfall Monitoring Mission (TRMM suggests that the variation of total annual rainfall could reach 20%, thus the resulting hydrological fluctuations could affect the estimated filling time, the operational functions and discharge downstream. The negative hydrological impacts of the Renaissance Dam will increase by increasing the height of its spillway dam, as increasing the storage capacity could affect the strategic storage for the reservoirs in Egypt and Sudan. It is strongly recommended that an agreement should be reached to compromise the storage capacities and water supplies for all dams on the Nile to thoroughly satisfy the necessary needs.

  11. The effects of medieval dams on genetic divergence and demographic history in brown trout populations

    DEFF Research Database (Denmark)

    Hansen, Michael Møller; Limborg, Morten; Ferchaud, A.-L.

    2014-01-01

    Background: Habitat fragmentation has accelerated within the last century, but may have been ongoing over longer time scales. We analyzed the timing and genetic consequences of fragmentation in two isolated lake-dwelling brown trout populations. They are from the same river system (the Gudenå River......, Denmark) and have been isolated from downstream anadromous trout by dams established ca. 600-800 years ago. For reference, we included ten other anadromous populations and two hatchery strains. Based on analysis of 44 microsatellite loci we investigated if the lake populations have been naturally...... genetically differentiated from anadromous trout for thousands of years, or have diverged recently due to the establishment of dams. Results: Divergence time estimates were based on 1) Approximate Bayesian Computation and 2) a coalescent-based isolation-with-gene-flow model. Both methods suggested divergence...

  12. Methane emission and oxygen consumption in the hydroelectric dam of Petit Saut in French Guyana

    International Nuclear Information System (INIS)

    Galy-Lacaux, C.; Jambert, C.; Delmas, R.; Dumestre, J.F.; Labroue, L.; Cerdan, P.; Richard, S.

    1996-01-01

    Methane emissions from the hydroelectric dam of Petit-Saut, in French Guyana, were measured over a 20-months period. Since the beginning of the reservoir filling (January 1994), 300 km 2 of tropical forest have been submerged. Biological CH 4 oxidation, in the surface water of the lake and in the river downstream of the dam, lead to an intense 0 2 consumption. Emissions of CH 4 by diffusion into the atmosphere or by degassing of the water released into the river as well as the stock of dissolved gas in the lake, and their temporal dynamics, were studied. Maximum emissions of 700 t (CH 4 ) per day were attained in February 1994, corresponding to maximum dissolved CH 4 concentrations of 14 mg l -1 in the water column. Total emissions since January 1994, were calculated from the whole data set. (authors). 7 refs., 2 figs., 1 tab

  13. Research on shape optimization of CSG dams

    Directory of Open Access Journals (Sweden)

    Xin Cai

    2011-12-01

    Full Text Available The multi-objective optimization method was used for shape optimization of cement sand and gravel (CSG dams in this study. The economic efficiency, the sensitivities of maximum horizontal displacement and maximum settlement of the dam to water level changes, the overall stability, and the overall strength security were taken into account during the optimization process. Three weight coefficient selection schemes were adopted to conduct shape optimization of a dam, and the case studies lead to the conclusion that both the upstream and downstream dam slope ratios for the optimal cross-section equal 1:0.7, which is consistent with the empirically observed range of 1:0.6 to 1:0.8 for the upstream and downstream dam slope ratios of CSG dams. Therefore, the present study is of certain reference value for designing CSG dams.

  14. Dynamic tests at the Outardes 3 dam

    International Nuclear Information System (INIS)

    Proulx, J.; Paultre, P.; Duron, Z.; Tai Mai Phat; Im, O.

    1992-01-01

    At the Outardes 3 gravity dam, part of the Manicouagan-Outardes hydroelectric complex in northeastern Quebec, forced vibration tests were carried out using an eccentric mass shaker attached to the dam crest at three different locations. Accelerations were measured along the crest and in the inspection galleries, and hydrodynamic pressures were measured along the upstream dam face and at various locations in the reservoir. The tests were designed to analyze the effects of gravity dam-reservoir interactions and to generate a data base for calibrating finite element models used in studying the dynamic behavior of gravity dams. Experimental results are presented in order to demonstrate the quality of the data obtained and the effectiveness of the experimental procedures. Modes of vibration were observed which corresponded to those obtained by finite element analysis. It is shown that techniques recently developed for dynamic tests on large dams can be successfully used on gravity dams. 3 refs., 6 figs

  15. Smithville Lake Historical Resources Mitigation Program: Oral History.

    Science.gov (United States)

    1980-02-01

    NOTES It. KEY WORDS (Co,,tirvuo on reverse sicd. It necesar And ident ify by block numb~f~r) Smithville Dam and Lake, Missouri Schools Poultry Houses...107 The Poultry Houses................................... 112 General Stores .................................. 114 Furniture Manufacturing...periodic large-scale jobs, such as threshing and butchering , were performed with group effort. Enter- tainment was also group oriented. Schools and

  16. Impact of the Three-Gorges Dam and water transfer project on Changjiang floods

    Science.gov (United States)

    Nakayama, Tadanobu; Shankman, David

    2013-01-01

    Increasing frequency of severe floods on the middle and lower Changjiang (Yangtze) River during the past few decades can be attributed to both abnormal monsoon rainfall and landscape changes that include extensive deforestation affecting river sedimentation, and shrinking lakes and levee construction that reduced the areas available for floodwater storage. The Three-Gorges Dam (TGD) and the South-to-North Water Transfer Project (SNWTP) will also affect frequency and intensity of severe floods in the Poyang Lake region of the middle Changjiang. Process-based National Integrated Catchment-based Eco-hydrology (NICE) model predicts that the TGD will increase flood risk during the early summer monsoon against the original justifications for building the dam, relating to complex river-lake-groundwater interactions. Several scenarios predict that morphological change will increase flood risk around the lake. This indicates the importance of managing both flood discharge and sediment deposition for the entire basin. Further, the authors assessed the impact of sand mining in the lake after its prohibition on the Changjiang, and clarified that alternative scenario of sand mining in lakes currently disconnected from the mainstream would reduce the flood risk to a greater extent than intensive dredging along junction channel. Because dry biomasses simulated by the model were linearly related to the Time-Integrated Normalized Difference Vegetation Index (TINDVI) estimated from satellite images, its decadal gradient during 1982-1999 showed a spatially heterogeneous distribution and generally decreasing trends beside the lakes, indicating that the increases in lake reclamation and the resultant decrease in rice productivity are closely related to the hydrologic changes. This integrated approach could help to minimize flood damage and promote better decisions addressing sustainable development.

  17. Use of isotopes and geophysical techniques in studying dam leakage-case of the Afamia dams Syria

    International Nuclear Information System (INIS)

    Kattan, Z.; Naser, R.; Al-Fares, W.; Kadkoy, N.; Sbenati, M.R.; Al-Hilal, M.; Sleman, I.; Al-Ali, A.

    2011-08-01

    Different techniques such as: hydrochemistry, environmental isotopes, radon and geophysical surveys have been applied all together in investigating the water leakages from the Afamia (A, B and C) dams during the period 2006-2008. Groundwater movement in this area shows the existence of two major discharge cones or sinks in the vicinity of B and C reservoirs. This movement suggests a probable vertical leaking and interconnection between the shallow Neogene aquifer and the deeper Karstified water bearing system of the Upper Cretaceous. Spatial distribution patterns of major ions in the groundwater provided comprehensive arguments for the existence of an active dissolution zone of calcareous rocks at a depth of about 45 m below the land surface, facilitating hence the vertical penetration of stored surface water towards the Cretaceous aquifer. The remarkable contrasts in stable isotope compositions between the depleted and highly enriched waters nearby the B reservoir provide another support for water leaks by vertical penetration beneath or very close to the B dam body. The high radon values in the soils, linearly distributed along some tectonic lineaments, may indicate the usefulness of radon method for tracing and mapping unknown faults. Application of some selected geophysical methods (electromagnetic survey, vertical geoelectric sounding and tomography plates) revealed the presence of alternating lithological heterogeneity between permeable and impermeable layers, which may lead to subhorizontal infiltration through the geological formations of the basin. Vertical leakage which could take place in certain locations via existing faults and karst and fractures that hit the main valley may pass through the dam lake. This structure is most likely causing hydraulic connections between the superficial Neogene deposits and the underlying Cretaceous fractured and permeable carbonates rocks. The presence of clayey and silty zones, mostly of high electrical conductivity

  18. Proceedings of the 2010 Canadian Dam Association's public safety around dams workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Nearly 30 people have drowned in dam-related incidents over the last 10 years in Canada. The Canadian public is now calling for improved safety guidelines. Public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. However, many members of the public are not aware of the dangers posed by dams. This workshop provided a forum to discuss proposals for a draft publication of the Canadian Dam Association (CDA) guidelines for public safety and security around dams. Issues related to current legislation and liability were discussed. Methods of increasing public awareness of the hazards posed by dams included increased signage in dam locations, the use of audible and visual alert systems, and the use of booms and buoys. The responsibilities of dam owners in ensuring the safety of dams were also discussed. The conference featured 5 presentations, of which 2 have been catalogued separately for inclusion in this database. tabs., figs.

  19. Study of Dam-break Due to Overtopping of Four Small Dams in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zakaraya Alhasan

    2015-01-01

    Full Text Available Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melín, and Metelský dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple one-dimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.

  20. After Three Gorges Dam: What have we learned?

    Science.gov (United States)

    Natali, J.; Williams, P.; Wong, R.; Kondolf, G. M.

    2013-12-01

    reservoir, subsequent floodplain development and degradation of levees increase downstream flood risk. As geomorphic adjustment continues, the loss of key fish and wildlife habitat will rise, a recognized but externalized environmental cost with potential mitigation measures found in protecting and restoring floodplain lakes. With significant underestimates of social impacts and project costs, the population of the surrounding area has experienced severe adverse impacts ranging from loss of ancient villages, landholdings, and livelihoods to increased threats of natural hazards -- without full compensation or public disclosure of project costs. The value of PPAs is most realized when integrated into adaptive management for river basin planning. Throughout the symposium, speakers echoed the conclusion: 'The entire Yangtze basin needs comprehensive management.' Integrated planning decisions must consider dams, water diversions, reservoir management, protection of natural areas, basin-wide land management, preservation of flood detention areas and levees, and both economic compensation and social opportunity for affected residents. The resulting analysis may influence the massive expansion of worldwide hydroelectric development as China exports its financing and dam building expertise.

  1. Challenges in understanding, modelling, and mitigating Lake Outburst Flood Hazard: experiences from Central Asia

    Science.gov (United States)

    Mergili, Martin; Schneider, Demian; Andres, Norina; Worni, Raphael; Gruber, Fabian; Schneider, Jean F.

    2010-05-01

    Lake Outburst Floods can evolve from complex process chains like avalanches of rock or ice that produce flood waves in a lake which may overtop and eventually breach glacial, morainic, landslide, or artificial dams. Rising lake levels can lead to progressive incision and destabilization of a dam, to enhanced ground water flow (piping), or even to hydrostatic failure of ice dams which can cause sudden outflow of accumulated water. These events often have a highly destructive potential because a large amount of water is released in a short time, with a high capacity to erode loose debris, leading to a powerful debris flow with a long travel distance. The best-known example of a lake outburst flood is the Vajont event (Northern Italy, 1963), where a landslide rushed into an artificial lake which spilled over and caused a flood leading to almost 2000 fatalities. Hazards from the failure of landslide dams are often (not always) fairly manageable: most breaches occur in the first few days or weeks after the landslide event and the rapid construction of a spillway - though problematic - has solved some hazardous situations (e.g. in the case of Hattian landslide in 2005 in Pakistan). Older dams, like Usoi dam (Lake Sarez) in Tajikistan, are usually fairly stable, though landsildes into the lakes may create floodwaves overtopping and eventually weakening the dams. The analysis and the mitigation of glacial lake outburst flood (GLOF) hazard remains a challenge. A number of GLOFs resulting in fatalities and severe damage have occurred during the previous decades, particularly in the Himalayas and in the mountains of Central Asia (Pamir, Tien Shan). The source area is usually far away from the area of impact and events occur at very long intervals or as singularities, so that the population at risk is usually not prepared. Even though potentially hazardous lakes can be identified relatively easily with remote sensing and field work, modeling and predicting of GLOFs (and also

  2. How have the river discharges and sediment loads changed in the Changjiang River basin downstream of the Three Gorges Dam?

    Science.gov (United States)

    Guo, Leicheng; Su, Ni; Zhu, Chunyan; He, Qing

    2018-05-01

    Streamflow and sediment loads undergo remarkable changes in worldwide rivers in response to climatic changes and human interferences. Understanding their variability and the causes is of vital importance regarding river management. With respect to the Changjiang River (CJR), one of the largest river systems on earth, we provide a comprehensive overview of its hydrological regime changes by analyzing long time series of river discharges and sediment loads data at multiple gauge stations in the basin downstream of Three Gorges Dam (TGD). We find profound river discharge reduction during flood peaks and in the wet-to-dry transition period, and slightly increased discharges in the dry season. Sediment loads have reduced progressively since 1980s owing to sediment yield reduction and dams in the upper basin, with notably accelerated reduction since the start of TGD operation in 2003. Channel degradation occurs in downstream river, leading to considerable river stage drop. Lowered river stages have caused a 'draining effect' on lakes by fostering lake outflows following TGD impoundments. The altered river-lake interplay hastens low water occurrence inside the lakes which can worsen the drought given shrinking lake sizes in long-term. Moreover, lake sedimentation has decreased since 2002 with less sediment trapped in and more sediment flushed out of the lakes. These hydrological changes have broad impacts on river flood and drought occurrences, water security, fluvial ecosystem, and delta safety.

  3. Coupled models in dam engineering

    OpenAIRE

    González Gutiérrez, María De Los Ángeles

    2016-01-01

    Rock ll dams are certainly one of the most important engineering structures due to their economic advantages and exible design. Unfortunately their vulnerability to overtopping still remains their weakest point. For that reason, several research groups are interested in both the numerical and experimental analysis of this phenomenon. In this work we focused on the numerical analysis. The previous work developed in CIMNE on a coupled PFEM-Eulerian free surface Compu- tational...

  4. Environmental monitoring at Olympic Dam

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The environmental management and protection program at the Olympic Dam uranium/copper/gold project, Roxby Downs, South Australia, monitors eight major environmental parameters - meteorology, vegetation, mine site rehabilitation, fauna, terrain, soil salinity, hydrogeology and well fields. It came into effect with the approval of the South Australian Government in March 1987. The Great Artesian Basin, one of the world's greatest artesian basins, is the source of the water supply for the project

  5. Habitat mosaics and path analysis can improve biological conservation of aquatic biodiversity in ecosystems with low-head dams.

    Science.gov (United States)

    Hitchman, Sean M; Mather, Martha E; Smith, Joseph M; Fencl, Jane S

    2018-04-01

    Conserving native biodiversity depends on restoring functional habitats in the face of human-induced disturbances. Low-head dams are a ubiquitous human impact that degrades aquatic ecosystems worldwide. To improve our understanding of how low-head dams impact habitat and associated biodiversity, our research examined complex interactions among three spheres of the total environment. i.e., how low-head dams (anthroposphere) affect aquatic habitat (hydrosphere), and native biodiversity (biosphere) in streams and rivers. Creation of lake-like habitats upstream of low-head dams is a well-documented major impact of dams. Alterations downstream of low head dams also have important consequences, but these downstream dam effects are more challenging to detect. In a multidisciplinary field study at five dammed and five undammed sites within the Neosho River basin, KS, we tested hypotheses about two types of habitat sampling (transect and mosaic) and two types of statistical analyses (analysis of covariance and path analysis). We used fish as our example of biodiversity alteration. Our research provided three insights that can aid environmental professionals who seek to conserve and restore fish biodiversity in aquatic ecosystems threatened by human modifications. First, a mosaic approach identified habitat alterations below low-head dams (e.g. increased proportion of riffles) that were not detected using the more commonly-used transect sampling approach. Second, the habitat mosaic approach illustrated how low-head dams reduced natural variation in stream habitat. Third, path analysis, a statistical approach that tests indirect effects, showed how dams, habitat, and fish biodiversity interact. Specifically, path analysis revealed that low-head dams increased the proportion of riffle habitat below dams, and, as a result, indirectly increased fish species richness. Furthermore, the pool habitat that was created above low-head dams dramatically decreased fish species richness

  6. Habitat mosaics and path analysis can improve biological conservation of aquatic biodiversity in ecosystems with low-head dams

    Science.gov (United States)

    Hitchman, Sean M.; Mather, Martha E.; Smith, Joseph M.; Fencl, Jane S.

    2018-01-01

    Conserving native biodiversity depends on restoring functional habitats in the face of human-induced disturbances. Low-head dams are a ubiquitous human impact that degrades aquatic ecosystems worldwide. To improve our understanding of how low-head dams impact habitat and associated biodiversity, our research examined complex interactions among three spheres of the total environment. i.e., how low-head dams (anthroposphere) affect aquatic habitat (hydrosphere), and native biodiversity (biosphere) in streams and rivers. Creation of lake-like habitats upstream of low-head dams is a well-documented major impact of dams. Alterations downstream of low head dams also have important consequences, but these downstream dam effects are more challenging to detect. In a multidisciplinary field study at five dammed and five undammed sites within the Neosho River basin, KS, we tested hypotheses about two types of habitat sampling (transect and mosaic) and two types of statistical analyses (analysis of covariance and path analysis). We used fish as our example of biodiversity alteration. Our research provided three insights that can aid environmental professionals who seek to conserve and restore fish biodiversity in aquatic ecosystems threatened by human modifications. First, a mosaic approach identified habitat alterations below low-head dams (e.g. increased proportion of riffles) that were not detected using the more commonly-used transect sampling approach. Second, the habitat mosaic approach illustrated how low-head dams reduced natural variation in stream habitat. Third, path analysis, a statistical approach that tests indirect effects, showed how dams, habitat, and fish biodiversity interact. Specifically, path analysis revealed that low-head dams increased the proportion of riffle habitat below dams, and, as a result, indirectly increased fish species richness. Furthermore, the pool habitat that was created above low-head dams dramatically decreased fish species

  7. Mitigating Dam Impacts Using Environmental Flow Releases

    Science.gov (United States)

    Richter, B. D.

    2017-12-01

    One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible

  8. Flood hydrology and dam-breach hydraulic analyses of four reservoirs in the Black Hills, South Dakota

    Science.gov (United States)

    Hoogestraat, Galen K.

    2011-01-01

    Extensive information about the construction of dams or potential downstream hazards in the event of a dam breach is not available for many small reservoirs within the Black Hills National Forest. In 2009, the U.S. Forest Service identified the need for reconnaissance-level dam-breach assessments for four of these reservoirs within the Black Hills National Forest (Iron Creek, Horsethief, Lakota, and Mitchell Lakes) with the potential to flood downstream structures. Flood hydrology and dam-breach hydraulic analyses for the four selected reservoirs were conducted by the U.S. Geological Survey in cooperation with the U.S. Forest service to estimate the areal extent of downstream inundation. Three high-flow breach scenarios were considered for cases when the dam is in place (overtopped) and when a dam break (failure) occurs: the 100-year recurrence 24-hour precipitation, 500-year recurrence peak flow, and the probable maximum precipitation. Inundation maps were developed that show the estimated extent of downstream floodwaters from simulated scenarios. Simulation results were used to determine the hazard classification of a dam break (high, significant, or low), based primarily on the potential for loss of life or property damage resulting from downstream inundation because of the flood surge.The inflow design floods resulting from the two simulated storm events (100-year 24-hour and probable maximum precipitation) were determined using the U.S. Army Corps of Engineers Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS). The inflow design flood for the 500-year recurrence peak flow was determined by using regional regression equations developed for streamflow-gaging stations with similar watershed characteristics. The step-backwater hydraulic analysis model, Hydrologic Engineering Center's River Analysis System (HEC-RAS), was used to determine water-surface profiles of in-place and dam-break scenarios for the three inflow design floods that were

  9. Meta-analysis of environmental effects of beaver in relation to artificial dams

    Science.gov (United States)

    Ecke, Frauke; Levanoni, Oded; Audet, Joachim; Carlson, Peter; Eklöf, Karin; Hartman, Göran; McKie, Brendan; Ledesma, José; Segersten, Joel; Truchy, Amélie; Futter, Martyn

    2017-11-01

    Globally, artificial river impoundment, nutrient enrichment and biodiversity loss impair freshwater ecosystem integrity. Concurrently, beavers, ecosystem engineers recognized for their ability to construct dams and create ponds, are colonizing sites across the Holarctic after widespread extirpation in the 19th century, including areas outside their historical range. This has the potential to profoundly alter hydrology, hydrochemistry and aquatic ecology in both newly colonized and recolonized areas. To further our knowledge of the effects of beaver dams on aquatic environments, we extracted 1366 effect sizes from 89 studies on the impoundment of streams and lakes. Effects were assessed for 16 factors related to hydrogeomorphology, biogeochemistry, ecosystem functioning and biodiversity. Beaver dams affected concentrations of organic carbon in water, mercury in water and biota, sediment conditions and hydrological properties. There were no overall adverse effects caused by beaver dams or ponds on salmonid fish. Age was an important determinant of effect magnitude. While young ponds were a source of phosphorus, there was a tendency for phosphorus retention in older systems. Young ponds were a source methylmercury in water, but old ponds were not. To provide additional context, we also evaluated similarities and differences between environmental effects of beaver-constructed and artificial dams (767 effect sizes from 75 studies). Both are comparable in terms of effects on, for example, biodiversity, but have contrasting effects on nutrient retention and mercury. These results are important for assessing the role of beavers in enhancing and/or degrading ecological integrity in changing Holarctic freshwater systems.

  10. Environmental considerations in energy planning for the Amazon region: Downstream effects of dams

    International Nuclear Information System (INIS)

    Manyari, Waleska Valenca; de Carvalho, Osmar Abilio

    2007-01-01

    The most salient current feature of the electric energy sector in Brazil is the pressing need for expansion. In this context, the hydroelectric resources of the Amazon region are considered a competitive alternative despite the structural problems they entail. These include reliance of new investments and environmental restrictions. Concerning the latter, plans to build large-scale dams in the region have drawn criticism mainly on account of the loss of forest cover in areas flooded by dam reservoirs and the conflicts concerning the relocation of indigenous and riverside communities in the region. This article seeks to contribute to better understanding of the environmental issue in the Amazon by focusing attention on the downstream effects of dams, which have large-scale, hitherto neglected ecological repercussions. The impact of dams extends well beyond the area surrounding the artificial lakes they create, harming rich Amazon wetland ecosystems. The morphology of dammed rivers changes in response to new inputs of energy and matter, which may in turn destroy certain biotopes. This is a remote-sensing-based case study of the Tucurui hydroelectric scheme in the Amazon state of Para. Attention is drawn to the need to take into account effects on alluvial rivers downstream from hydroelectric power plants when it comes to making planning decisions, as part of a sustainable energy policy

  11. Hungry Horse mitigation: Aquatic modeling of the selective withdrawal system -- Hungry Horse Dam, Montana

    International Nuclear Information System (INIS)

    Marotz, B.L.; Althen, C.; Gustafson, D.

    1994-04-01

    Hungry Horse Dam presently releases frigid water from the bottom of the reservoir all year long. Cold water effects insect production and fish growth downstream. Rapid temperature changes of up to 8.3 C (14 F) have been measured in the Flathead River downstream of the South Fork confluence, controlled by dam discharges. Thermal effects from Hungry Horse Dam are detectable for over 64 Km downstream to Flathead Lake. The installation of a selective withdrawal structure on each of the dam's discharge penstocks was determined to be the most cost-effective means to provide constant, permanent temperature control without impacting power production and flexibility in dam operation. The thermal model presented herein revealed that fish growth potential in the river would increase two to five times through selective withdrawal, temperature control. Temperature control is possible over the entire range of turbine discharge capacity, with very little effect on power production. Findings indicate that angling would improve through higher catch rates and larger fish. Temperature control will solve the most serious impact to river health. However, flow fluctuations will continue to effect insect production and usable fishery habitat in the Flathead River. A natural thermal regime combined with moderated flow fluctuation would further enhance riverine food production, trout growth and recreation potential

  12. Environmental-impact assessment of dams and reservoir projects (review and a case study)

    International Nuclear Information System (INIS)

    Shah, S.M.

    2009-01-01

    Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results in silting up of reservoirs. Water shortages on mountain rivers may leave unsightly dry river-beds below a dam. Sediment deposition and growth of vegetation in reservoir affects the water-extraction for navigation power-generation and fishing. Various dams and reservoir projects in the world are critically studied, in terms of creating environmental impacts. The Kala Bagh Dam project (Pakistan), which is ready for construction, has been analysed as a case study, by matrix method. Analyses show that adverse effects of this dam are less than the benefits. It is recommended that based on the experience, appropriate lines and strategies may be drawn up to evaluate the local projects. Multidisciplinary experts need to be involved, for assessing environmental impacts and suggesting mitigation measures, to combat the adverse effects. (author)

  13. Rivers affect the biovolume and functional traits of phytoplankton in floodplain lakes

    Directory of Open Access Journals (Sweden)

    Alfonso Pineda

    2017-12-01

    Full Text Available Abstract Aim: We analyzed the temporal distribution (dry and rainy periods of phytoplankton functional groups (biovolume from lakes connected to dammed (S1 - Paraná River and non-dammed rivers (S2 - Baia River and S3 - Ivinhema River in the upper Paraná River floodplain, Brazil. We also determined the drivers of the phytoplankton community assemblage. Methods Phytoplankton and environmental variables samplings were performed quarterly in dry (2000 and 2001 and rainy (2010 and 2011 periods. We classified the phytoplankton species into seven morphological based functional groups (MBFG. We used analysis of variance to test differences in total phytoplankton biovolume and MBFGs biovolume between lakes and climatic periods. We also used redundancy analysis to determine the MBFGs-environment relation. Results The lake related to the dammed river (S1 presented the lowest species richness. The total phytoplankton biovolume presented differences among the lakes, but we did not register temporal differences associated with water level variation. The lake related to the non-dammed and semi-lentic river (S2 presented the highest biovolume, while S1 (related to the dammed river and S3 (related to the non-dammed river exhibited the lowest ones. Filamentous organisms (MBFG III were associated with poor nutrient conditions and diatoms (MBFG VI were favored in high water mixing sites. The flagellate groups MBFG II and MBFG V were related to deeper water and lower column mixing conditions, respectively. Conclusions Our results suggest that phytoplankton species with different functional traits drive the primary productivity in the dry and rainy periods. Hence, we highlight the importance of maintaining high functional diversity in lakes to ensure primary productivity. Therefore, we stress the importance of protecting the natural environment such as floodplain lakes because of its contribution to the regional biodiversity and the flow of energy.

  14. Lake Cadagno

    DEFF Research Database (Denmark)

    Tonolla, Mauro; Storelli, Nicola; Danza, Francesco

    2017-01-01

    Lake Cadagno (26 ha) is a crenogenic meromictic lake located in the Swiss Alps at 1921 m asl with a maximum depth of 21 m. The presence of crystalline rocks and a dolomite vein rich in gypsum in the catchment area makes the lake a typical “sulphuretum ” dominated by coupled carbon and sulphur...... cycles. The chemocline lies at about 12 m depth, stabilized by density differences of salt-rich water supplied by sub-aquatic springs to the monimolimnion and of electrolyte-poor surface water feeding the mixolimnion. Steep sulphide and light gradients in the chemocline support the growth of a large...... in the chemocline. Small-celled PSB together with the sulfate-reducing bacterium Desulfocapsa thiozymogenes sp. form stable aggregates in the lake, which represent small microenvironments with an internal sulphur cycle. Eukaryotic primary producers in the anoxic zones are dominated by Cryptomonas phaseolus...

  15. Playa Lakes

    Data.gov (United States)

    Kansas Data Access and Support Center — This digital dataset provides information about the spatial distribution of soil units associated with playa lakes. Specific soil types have been designated by the...

  16. Three Sisters Dam modifications and performance

    Energy Technology Data Exchange (ETDEWEB)

    Courage, L.J.R. [Monenco AGRA Inc., Calgary, AB (Canada)

    1995-12-31

    Recent modifications and maintenance carried out at the Three Sisters Dam, in the Alberta Rockies south of the town of Canmore, were described. A detailed account was given of the dam`s geological setting, its abnormally high leakage through the foundation and its sinkhole activity. Results of studies aimed at finding the cause of leakage and sinkhole occurrences were reviewed. Modifications made to the dam since 1951 were detailed, as were modifications to handle probable maximum flood levels. Three approaches for estimating failure probabilities after identification of failure modes were described. The overall conclusion was that based on constant leakage, no settlement in the dam, penstocks, or the powerhouse since construction, the Three Sisters Dam was stable. 1 ref.

  17. The changing hydrology of a dammed Amazon

    Science.gov (United States)

    Timpe, Kelsie; Kaplan, David

    2017-01-01

    Developing countries around the world are expanding hydropower to meet growing energy demand. In the Brazilian Amazon, >200 dams are planned over the next 30 years, and questions about the impacts of current and future hydropower in this globally important watershed remain unanswered. In this context, we applied a hydrologic indicator method to quantify how existing Amazon dams have altered the natural flow regime and to identify predictors of alteration. The type and magnitude of hydrologic alteration varied widely by dam, but the largest changes were to critical characteristics of the flood pulse. Impacts were largest for low-elevation, large-reservoir dams; however, small dams had enormous impacts relative to electricity production. Finally, the “cumulative” effect of multiple dams was significant but only for some aspects of the flow regime. This analysis is a first step toward the development of environmental flows plans and policies relevant to the Amazon and other megadiverse river basins. PMID:29109972

  18. Exporting dams: China's hydropower industry goes global.

    Science.gov (United States)

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  19. Measurement of Dam Deformations: Case Study of Obruk Dam (Turkey)

    Science.gov (United States)

    Gulal, V. Engin; Alkan, R. Metin; Alkan, M. Nurullah; İlci, Veli; Ozulu, I. Murat; Tombus, F. Engin; Kose, Zafer; Aladogan, Kayhan; Sahin, Murat; Yavasoglu, Hakan; Oku, Guldane

    2016-04-01

    In the literature, there is information regarding the first deformation and displacement measurements in dams that were conducted in 1920s Switzerland. Todays, deformation measurements in the dams have gained very different functions with improvements in both measurement equipment and evaluation of measurements. Deformation measurements and analysis are among the main topics studied by scientists who take interest in the engineering measurement sciences. The Working group of Deformation Measurements and Analysis, which was established under the International Federation of Surveyors (FIG), carries out its studies and activities with regard to this subject. At the end of the 1970s, the subject of the determination of fixed points in the deformation monitoring network was one of the main subjects extensively studied. Many theories arose from this inquiry, as different institutes came to differing conclusions. In 1978, a special commission with representatives of universities has been established within the FIG 6.1 working group; this commission worked on the issue of determining a general approach to geometric deformation analysis. The results gleaned from the commission were discussed at symposiums organized by the FIG. In accordance with these studies, scientists interested in the subject have begun to work on models that investigate cause and effect relations between the effects that cause deformation and deformation. As of the scientist who interest with the issue focused on different deformation methods, another special commission was established within the FIG engineering measurements commission in order to classify deformation models and study terminology. After studying this material for a long time, the official commission report was published in 2001. In this prepared report, studies have been carried out by considering the FIG Engineering Surveying Commission's report entitled, 'MODELS AND TERMINOLOGY FOR THE ANALYSIS OF GEODETIC MONITORING OBSERVATIONS

  20. Remote assessment of reserve capacity of outburst alpine lakes

    Directory of Open Access Journals (Sweden)

    V. G. Konovalov

    2016-01-01

    Full Text Available Results of distant satellite sounding (the TERRA satellite of high-mountainous areas and digital models SRTM 4.1 and ASTER DEM G2 of the same relief were used to calculate the following parameters of high-mountain dammed glacial lakes: area, depth, the water volume, excess of the dam above the water level. It is important for estimation of the water volume that can be dangerous for a break-through of a dammed lake. Formulas deduced to calculate the depth and volume of a lake for several sections of its area were tested and proposed. It is demonstrated that the regression equation V = Hmax × F, where Hmax is maximum depth of the lake, can be used as the parameterization of the formula «lake volume V equals the product of the area F on average depth D». More precise values of the coefficients a and b in the formula V = aFb were also obtained. Parameters and the water volumes of lakes were estimated for the river Gunt (right tributary of Pyanj River basin. According to [28], there are 428 high-mountain lakes in this region with their total area ≥ 2500 m2. For basin Inflow of melted snow and glacier water caused by the rise of mean summer air temperatures in 1931–2015 was estimated for the lake Rivankul basin (the Pamir Mountains.

  1. Seasonality and shift in age-specific malaria prevalence and incidence in Binko and Carrière villages close to the lake in Selingué, Mali

    DEFF Research Database (Denmark)

    Touré, Mahamoudou; Sanogo, Daouda; Dembele, Soumaila

    2016-01-01

    but distant from the hydroelectric dam, and Binko, near irrigated rice fields, close to the dam. The aim of this study was to provide baseline data, seasonal pattern and age distribution of malaria incidence in two sites situated close to a lake in Selingué. METHODS: Geographically, Selingué area is located...

  2. Dam safety management in Victoria (Australia)

    International Nuclear Information System (INIS)

    Adem, J.

    1996-01-01

    The Victoria state government's decision to make dam owners accountable for safety and upkeep of their dams was reported. To give effect to this decision a series of guidelines have been developed which outline the required activities and skills to ensure that dams are properly managed within a framework of 'light-handed' regulation. The guidelines are also intended to ensure that dam management becomes an integral part of the business decision making process, not just a set of prescribed technical procedures. Details of the direction being taken and the proposed controls to ensure compliance with national and international standards were described. 4 refs., 2 figs

  3. Numerical modelling for stability of tailings dams

    OpenAIRE

    Auchar, Muhammad; Mattsson, Hans; Knutsson, Sven

    2013-01-01

    A tailings dam is a large embankment structure that is constructed to store the waste from the mining industry. Stability problems may occur in a tailings dam due to factors such as quick rate of raising, internal erosion and liquefaction. The failure of a tailings dam may cause loss of human life and environmental degradation. Tailings Dams must not only be stable during the time the tailings storage facility is in operation, but also long time after the mine is closed. In Sweden, the licens...

  4. Brazil's Amazonian dams: Ecological and socioeconomic impacts

    Science.gov (United States)

    Fearnside, P. M.

    2016-12-01

    Brazil's 2015-2024 Energy Expansion Plan calls for 11 hydroelectric dams with installed capacity ≥ 30 MW in the country's Amazon region. Dozens of other large dams are planned beyond this time horizon, and dams with environmental and socioeconomic impacts. Loss of forest to flooding is one, the Balbina and Tucuruí Dams being examples (each 3000 km2). If the Babaquara/Altamira Dam is built it will flood as much forest as both of these combined. Some planned dams imply loss of forest in protected areas, for example on the Tapajós River. Aquatic and riparian ecosystems are lost, including unique biodiversity. Endemic fish species in rapids on the Xingu and Tapajós Rivers are examples. Fish migrations are blocked, such as the commercially important "giant catfish" of the Madeira River. Dams emit greenhouse gases, including CO2 from the trees killed and CH4 from decay under anoxic conditions at the bottom of reservoirs. Emissions can exceed those from fossil-fuel generation, particularly over the 20-year period during which global emissions must be greatly reduced to meet 1.5-2°C limit agreed in Paris. Carbon credit for dams under the Climate Convention causes further net emission because the dams are not truly "additional." Anoxic environments in stratified reservoirs cause methylation of mercury present in Amazonian soils, which concentrates in fish, posing a health risk to human consumers. Population displacement is a major impact; for example, the Marabá Dam would displace 40,000 people, mostly traditional riverside dwellers (ribeirinhos). Various dams impact indigenous peoples, such as the Xingu River dams (beginning with Belo Monte) and the São Luiz do Tapajós and Chacorão Dams on the Tapajós River. Brazil has many energy options other than dams. Much energy use has little benefit for the country, such as exporting aluminum. Electric showerheads use 5% of the country's power. Losses in transmission lines (20%) are far above global averages and can be

  5. Japan`s largest composition dam, aiming for harmony with nature. Chubetsu dam; Shizen tono chowa wo mezasu, Nippon ichi no fukugo dam. Chubetsu dam

    Energy Technology Data Exchange (ETDEWEB)

    Mizushima, T. [Hokkaido Development Bureau, Hokkaido Development Agency, Sapporo (Japan)

    1994-08-15

    This paper introduces Chubetsu Dam planned with a large-scale embankment having a river bed width of 600 m. Chubetsu Dam is being constructed with such objectives as flood control of Ishikari River, river flow rate maintenance, drinking water supply, irrigation water supply and power generation. The dam site is a gravel bed having a river bed width of 600 m and a maximum foundation rock thickness of 40 m, requiring evaluations as a dam foundation and discussions of water shielding methods. As a result of discussions at the Chubetsu Dam technical discussion committee, the dam type is decided to be a composition dam consisting of a gravity type concrete dam on the left river side and a central core type fill dam using a part of the gravel bed as the foundation on the right river side. A continuous underground wall system is planned to be used for shielding water in the gravel foundation. In discussing the anti-seismic properties, analyses for bank construction and water filling to derive stress and deformation conditions prior to an earthquake and a time-history response analysis to derive conditional changes during the earthquake are performed. According to the results thereof, evaluations are given on the safety by compounding the stress and the acceleration. In plans to improve the surrounding areas, an area will be provided upstream the reservoir where the water level is kept constant to serve as a bird sanctuary. 7 figs.

  6. Flood effects provide evidence of an alternate stable state from dam management on the Upper Missouri River

    Science.gov (United States)

    Skalak, Katherine; Benthem, Adam J.; Hupp, Cliff R.; Schenk, Edward R.; Galloway, Joel M.; Nustad, Rochelle A.

    2017-01-01

    We examine how historic flooding in 2011 affected the geomorphic adjustments created by dam regulation along the approximately 120 km free flowing reach of the Upper Missouri River bounded upstream by the Garrison Dam (1953) and downstream by Lake Oahe Reservoir (1959) near the City of Bismarck, ND, USA. The largest flood since dam regulation occurred in 2011. Flood releases from the Garrison Dam began in May 2011 and lasted until October, peaking with a flow of more than 4200 m3 s−1. Channel cross-section data and aerial imagery before and after the flood were compared with historic rates of channel change to assess the relative impact of the flood on the river morphology. Results indicate that the 2011 flood maintained trends in island area with the loss of islands in the reach just below the dam and an increase in island area downstream. Channel capacity changes varied along the Garrison Segment as a result of the flood. The thalweg, which has been stable since the mid-1970s, did not migrate. And channel morphology, as defined by a newly developed shoaling metric, which quantifies the degree of channel braiding, indicates significant longitudinal variability in response to the flood. These results show that the 2011 flood exacerbates some geomorphic trends caused by the dam while reversing others. We conclude that the presence of dams has created an alternate geomorphic and related ecological stable state, which does not revert towards pre-dam conditions in response to the flood of record. This suggests that management of sediment transport dynamics as well as flow modification is necessary to restore the Garrison Segment of the Upper Missouri River towards pre-dam conditions and help create or maintain habitat for endangered species. Published 2016. This article is a U.S. Government work and is in the public domain in the USA.

  7. Olympic Dam - the first decade

    International Nuclear Information System (INIS)

    Newton, A.W.; Wilson, M.A.; Harris, J.

    1988-01-01

    Most aspects of the pre-production phase of the Olympic Dam Project, from commencement of exploration in May 1975 through to commitment to development in December 1985 are documented here. The discovery by Western Mining Corporation Ltd of copper mineralisation on Roxby Downs Station in July 1975 has led to one of the more intensive base-metal exploration programmes undertaken in Australia. Comprehensive exploration, evaluation and feasibility studies between 1975 and 1985 have delineated a probable 450 million tonnes of higher grade ore containing 2.5% copper, 0.8 kg/t uranium oxide, 0.6 g/t gold and 6.0 g/t silver. The total resource is estimated at 2 billion tonnes containing 1.6% copper, 0.6 kg/t uranium oxide, 0.6 g/t gold and 3.5 g/t silver. At 31 December 1985, over 540 km of surface and underground drilling had been completed, comprising over 700 surface drillholes totalling 234 km of core and 218 km of open-hole drilling, and about 900 underground diamond-drillholes totalling 90 km. The Whenan Shaft had been sunk to 500 m and driving on three levels totalled almost 10 km. More than one million tonnes of ore and mullock were raised during development. A pilot treatment plant commissioned on site produced concentrates, matte and blister copper, and ammonium diuranate. Following a technical study of the Olympic Dam Project, completed in March 1985, and a subsequent economic feasibility study, it was announced on 11 June 1985 that the initial project was considered to be commercially viable. On 8 December 1985, the joint venturers, Western Mining Corporation Holdings Ltd (51%) and the BP Group (49%), announced their commitment to the Project. An appendix lists the important events that occurred between January 1986 and December 1987 in bringing Olympic Dam to the production state. 26 refs., 17 figs., 5 tabs., ills

  8. Principles of lake sedimentology

    International Nuclear Information System (INIS)

    Janasson, L.

    1983-01-01

    This book presents a comprehensive outline on the basic sedimentological principles for lakes, and focuses on environmental aspects and matters related to lake management and control-on lake ecology rather than lake geology. This is a guide for those who plan, perform and evaluate lake sedimentological investigations. Contents abridged: Lake types and sediment types. Sedimentation in lakes and water dynamics. Lake bottom dynamics. Sediment dynamics and sediment age. Sediments in aquatic pollution control programmes. Subject index

  9. Evolution of ice-dammed proglacial lakes in Última Esperanza, Chile: implications from the late-glacial R1 eruption of Reclús volcano, Andean Austral Volcanic Zone Evolución de lagos proglaciales embalsados por hielo en Última Esperanza, Chile: Implicancias de la explosión volcánica tardiglacial R1 del volcán Reclús, Zona Volcánica Austral Andina

    Directory of Open Access Journals (Sweden)

    Charles R Stern

    2011-01-01

    Full Text Available Newly described outerops, excavations and sediment cores from the region of Última Esperanza, Magallanes, contain tephra derived from the large late-glacial explosive Rl eruption of the Reclús volcano in the Andean Austral Volcanic Zone. New radiocarbon dates associated to these deposits refine previous estimates of the age, to 14.9 cal kyrs BP (12,670±240 14C yrs BP, and volume, to >5 km³, of this tephra. The geographic and stratigraphic distribution of Rl also place constraints on the evolution of the ice-dammed proglacial lake that existed east of the cordillera in this area between the termination of the Last Glacial Maximum (LGM and the Holocene. This proglacial lake generated wave-cut terraces, and also caves, such as the Cueva de Milodón, along the highest prominent terrace. The current elevation of these terraces depends on the total amount of post-glacial isostatic rebound, which is unknown. Due to differential rebound, the highest prominent lake terraces decrease in height from west-to-east, from -170 m a.s.l. on Península Antonio Varas west of Seno Ultima Esperanza, to-150 m a.s.l. aroundLago Sofía, anddownto-125 m a.s.l. along their easternmost margin. The presence of thick deposits of Rl tephra in some of the caves around Lago Sofía implies that the proglacial lake had already dropped below its highest level prior to the time of this eruption, and, in fact, even earlier, prior to 16.1 cal kyrs BP (13,560±180 14C yrs BP, when land mammals first oceupied these caves. The depositional environment of Rl in a core from Dumestre bog suggests that the lake level was in fact 70 m a.s.l. until 12.8 cal kyrs BP (10,695±40 14C yrs BP. However, a 14.2 cal kyrs BP (12,125±85 14C yrs BF Mylodon pelvis from a nearby site, located at only -7 m a.s.l., suggests that the lake could have emptied, for at least a brief period, to this low level at this time. This latter datum, combined with the lack of any prominent terraces between the

  10. National dam inventory provides data for analysis

    International Nuclear Information System (INIS)

    Spragens, L.

    1992-01-01

    The Association of State Dam Safety Officials completed a dam inventory this fall. Information on approximately 90,000 state-regulated dams in the US collected during the four-year inventory is being used to build a database managed by the Federal Emergency Management Agency. In addition to ASDSO's work, the federal government conducted an inventory of federal dams. This data will be added to the state information to form one national database. The database will feature 35 data fields for each entry, including the name of the dam, its size, the name of the nearest downstream community, maximum discharge and storage volume, the date of the last inspection, and details about the emergency action plan. The program is an update of the nation's first dam inventory, required by the Dam Safety Act of 1972. The US Army Corps of Engineers completed the original inventory in 1981. The Water Resources Development Act of 1986 authorized appropriations of $2.5 million for the Corps to update the inventory. FEMA and the Corps entered into an agreement for FEMA to undertake the task for the Corps and to coordinate work on both the federal and state inventories. ASDSO compiles existing information on state-regulated dams into a common format for the database, added missing information, and established a process for continually updating data. ASDSO plans to analyze the information collected for the database. It will look at statistics for the number of dams regulated, communities that could be affected, and the number of high-hazard dams. FEMA is preparing reports for Congress on the project. The reports, which are expected to be ready by May 1993, will include information on the methodology used and facts about regulated dams under state jurisdiction

  11. Fragility Analysis of Concrete Gravity Dams

    Science.gov (United States)

    Tekie, Paulos B.; Ellingwood, Bruce R.

    2002-09-01

    Concrete gravity dams are an important part ofthe nation's infrastructure. Many dams have been in service for over 50 years, during which time important advances in the methodologies for evaluation of natural phenomena hazards have caused the design-basis events to be revised upwards, in some cases significantly. Many existing dams fail to meet these revised safety criteria and structural rehabilitation to meet newly revised criteria may be costly and difficult. A probabilistic safety analysis (PSA) provides a rational safety assessment and decision-making tool managing the various sources of uncertainty that may impact dam performance. Fragility analysis, which depicts fl%e uncertainty in the safety margin above specified hazard levels, is a fundamental tool in a PSA. This study presents a methodology for developing fragilities of concrete gravity dams to assess their performance against hydrologic and seismic hazards. Models of varying degree of complexity and sophistication were considered and compared. The methodology is illustrated using the Bluestone Dam on the New River in West Virginia, which was designed in the late 1930's. The hydrologic fragilities showed that the Eluestone Dam is unlikely to become unstable at the revised probable maximum flood (PMF), but it is likely that there will be significant cracking at the heel ofthe dam. On the other hand, the seismic fragility analysis indicated that sliding is likely, if the dam were to be subjected to a maximum credible earthquake (MCE). Moreover, there will likely be tensile cracking at the neck of the dam at this level of seismic excitation. Probabilities of relatively severe limit states appear to be only marginally affected by extremely rare events (e.g. the PMF and MCE). Moreover, the risks posed by the extreme floods and earthquakes were not balanced for the Bluestone Dam, with seismic hazard posing a relatively higher risk.

  12. Safety Aspects of Sustainable Storage Dams and Earthquake Safety of Existing Dams

    Directory of Open Access Journals (Sweden)

    Martin Wieland

    2016-09-01

    Full Text Available The basic element in any sustainable dam project is safety, which includes the following safety elements: ① structural safety, ② dam safety monitoring, ③ operational safety and maintenance, and ④ emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. However, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be carried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that dam safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.

  13. Timing of lake-level changes for a deep last-glacial Lake Missoula: optical dating of the Garden Gulch area, Montana, USA

    DEFF Research Database (Denmark)

    Smith, Larry N.; Sohbati, Reza; Buylaert, Jan-Pieter

    2018-01-01

    Glaciolacustrine sediments in the Clark Fork River valley at Garden Gulch, near Drummond, Montana, USA record highstand positions of the ice-dammed glacial Lake Missoula and repeated subaerial exposure. During these highstands the lake was at greater than 65% of its recognized maximum capacity......-level fluctuation, occurred over time scales of decades to ∼2 ka. Bioturbated sandy slopewash dated at 10.6 ± 0.9 ka and 11.9 ± 1.2 ka unconformably overlies the upper glaciolacustrine deposits. The uppermost sediments, above the glaciolacustrine section, are younger than the Glacier Peak tephra (13.7-13.4 cal ka B...... the lake's highstand position due to ice-dam failure likely led to scour in the downstream portions of the glacial Lake Missoula basin and megafloods in the Channeled Scabland....

  14. Measuring and managing safety at Wahleach Dam

    International Nuclear Information System (INIS)

    Salmon, G. M.; Cattanach, J. D.; Hartford, D. N. D.

    1996-01-01

    Safety improvements recently implemented at the Wahleach Dam were described as one of the first instances in international dam safety practice where risk concepts have been used in conjunction with acceptable risk criteria to evaluate safety of a dam relative to required level of safety. Erosion was identified as the greatest threat to the safety of the dam. In addressing the deficiencies B.C. Hydro formulated a process which advocates a balanced level of safety,i.e. the probability of failure multiplied by the consequences of failure, integrated over a range of initiators. If the risk posed by the dam is lower than a 'tolerable' risk, the dam is considered to be safe enough. In the case of the Wahleach Dam, the inflow design flood (IDF) was selected to be about one half of the probable maximum flow (PMF), hence it was more likely than not that the spillway could pass floods up to and including the PMF. By accepting the determined level of risk, expenditures of several million dollars for design and construction of dam safety improvements were made redundant. Another byproduct of this new concept of risk assessment was the establishment of improved life safety protection by means of an early warning system for severe floods through the downstream community and emergency authorities. 3 refs., 5 tabs

  15. Descriptive characteristics of the large Italian dams

    International Nuclear Information System (INIS)

    Dello Vicario, E.; Petaccia, A.; Savanella, V.

    1999-01-01

    In the present note the characteristics of the Italian dams are examined, underlining, in a statistical view, story, geographical location, types and use of the most important works. Such a review can be useful for a more detailed analysis, both for the dams characterization and for further studies relevant to water resources utilization [it

  16. The Impact of Dam-Reservoir-Foundation Interaction on Nonlinear Response of Concrete Gravity Dams

    International Nuclear Information System (INIS)

    Amini, Ali Reza; Motamedi, Mohammad Hossein; Ghaemian, Mohsen

    2008-01-01

    To study the impact of dam-reservoir-foundation interaction on nonlinear response of concrete gravity dams, a two-dimensional finite element model of a concrete gravity dam including the dam body, a part of its foundation and a part of the reservoir was made. In addition, the proper boundary conditions were used in both reservoir and foundation in order to absorb the energy of outgoing waves at the far end boundaries. Using the finite element method and smeared crack approach, some different seismic nonlinear analyses were done and finally, we came to a conclusion that the consideration of dam-reservoir-foundation interaction in nonlinear analysis of concrete dams is of great importance, because from the performance point of view, this interaction significantly improves the nonlinear response of concrete dams

  17. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Brian D. Richter

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  18. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong; Bao, Kai; Zhang, Hui

    2011-01-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  19. Seismic response of uplifting concrete gravity dams

    International Nuclear Information System (INIS)

    Leger, P.; Sauve, G.; Bhattacharjee, S.

    1992-01-01

    The foundation interaction effects on the seismic response of dam-foundation systems have generally been studied using the linear elastic finite element models. In reality, the foundation can not develop effective tensile stresses to a significant degree along the interface. A two-dimensional finite element model, in which nonlinear gap elements are used at the dam-foundation interface to determine the uplift response of concrete gravity dams subjected to seismic loads, is presented. Time domain analyses were performed for a wide range of modelling assumptions such as dam height, interface uplift pressure, interface mesh density, and earthquake input motions, that were systematically varied to find their influence on the seismic response. The nonlinear interface behavior generally reduces the seismic response of dam-foundation systems acting as a seismic isolation mechanism, and may increase the safety against sliding by reducing the base shear transmitted to the foundation. 4 refs., 5 figs., 6 tabs

  20. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong

    2011-08-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors\\' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  1. Groundwater flow through fissured rock: field investigations and interpretation in the Albigna dam area, Graubuenden, Switzerland

    International Nuclear Information System (INIS)

    Kovari, K.; Arn, Th.; Gmuender, Ch.

    1989-11-01

    The rock foundation of a dam was chosen as the site for repeated observations of flow patterns in a fissured rock. Our project was carried out at the Albigna Dam in the Canton of Graubuenden, Switzerland, where the greatest fluctuation in the level of the lake was approximately 100 m. In the area of the dam the rock consists of a fresh, solid granite, whose fissure systems were well known as regards position and distribution. The measurement program for assessing the flow conditions consisted of two elements: piezometric pressure measurements in boreholes and strain measurements in boreholes. Pressure measurements were accomplished to define the potential field. Strain measurements were accomplished to detect fracture opening and closing as a function of the fluctuations in the lake level. From a combination of the two sets of observations it was hoped to be able to determine the interaction between hydraulics and mechanics, i.e. the coupling of two key processes with a possible influence on a changing permeability of the rock. Using the 'sliding micrometer', the continuous strain distribution was determined along two boreholes in the measuring plane. Pressures were measured using the 'Piezodex' system. Mathematical investigations were conducted with the AQUA-ROCK finite element program on a 2D-model. From just a visual comparison of the measured and calculated values it is clear that a different model achieves the best correlation depending on the level of the lake. For the maximum lake level, however, it is essential to take account of the action of the fissures either by way of the idealization according to Snow (main model 2) or by considering the individual fissures (main model 3). (author) figs., tabs., 12 refs

  2. Sharing Perspectives and Learning from One Another: Southern Paiutes, Scientists, and Policymakers in the Glen Canyon Dam Adaptive Management Program

    Science.gov (United States)

    Austin, D. E.; Bulletts, K.; Bulletts, C.

    2017-12-01

    The traditional lands of the Southern Paiute people in the United States are bounded by more than 600 miles of the Colorado River from the Kaiparowits Plateau in the north to Blythe, California in the south. According to Southern Paiute traditional knowledge, Southern Paiutes were the first inhabitants of this region and are responsible for protecting and managing this land along with the water and all that is upon and within it. In 1963, the Bureau of Reclamation completed construction of Glen Canyon Dam on the Colorado River, and in 1972, the Glen Canyon National Recreation Area was established, encompassing Lake Mead above the Dam and a world class trout fishery on the Colorado River between the Dam and Lees Ferry. Below Lees Ferry on its way to Lake Mead and Hoover Dam, the Colorado River flows through Grand Canyon National Park and the Navajo and Hualapai reservations. U.S. federal law requires that Glen Canyon Dam be operated with minimal impact to the natural, recreational, and cultural resources of the region of the Colorado River that is potentially impacted by flows from the Dam. The Grand Canyon Protection Act and the Environmental Impact Statement (EIS) for the Operation of the Glen Canyon Dam established a program of long-term research and monitoring of the effects of the Dam on these resources. In 1991, three Southern Paiute tribes - the Kaibab Band of Paiute Indians, the Paiute Indian Tribe of Utah, and the San Juan Southern Paiute Tribe - agreed to participate in studies to identify cultural resources impacted by Glen Canyon Dam and to recommend strategies for their protection, In 1995, the EIS was completed and transition to the Adaptive Management Program (AMP) called for in the Grand Canyon Protection Act was begun. At that time, Southern Paiute activities expanded to include assessing potential environmental and cultural impacts of the dam, developing monitoring procedures, and interacting with scientists, other tribal representatives, and

  3. Great Lakes

    Science.gov (United States)

    Edsall, Thomas A.; Mac, Michael J.; Opler, Paul A.; Puckett Haecker, Catherine E.; Doran, Peter D.

    1998-01-01

    The Great Lakes region, as defined here, includes the Great Lakes and their drainage basins in Minnesota, Wisconsin, Illinois, Indiana, Ohio, Pennsylvania, and New York. The region also includes the portions of Minnesota, Wisconsin, and the 21 northernmost counties of Illinois that lie in the Mississippi River drainage basin, outside the floodplain of the river. The region spans about 9º of latitude and 20º of longitude and lies roughly halfway between the equator and the North Pole in a lowland corridor that extends from the Gulf of Mexico to the Arctic Ocean.The Great Lakes are the most prominent natural feature of the region (Fig. 1). They have a combined surface area of about 245,000 square kilometers and are among the largest, deepest lakes in the world. They are the largest single aggregation of fresh water on the planet (excluding the polar ice caps) and are the only glacial feature on Earth visible from the surface of the moon (The Nature Conservancy 1994a).The Great Lakes moderate the region’s climate, which presently ranges from subarctic in the north to humid continental warm in the south (Fig. 2), reflecting the movement of major weather masses from the north and south (U.S. Department of the Interior 1970; Eichenlaub 1979). The lakes act as heat sinks in summer and heat sources in winter and are major reservoirs that help humidify much of the region. They also create local precipitation belts in areas where air masses are pushed across the lakes by prevailing winds, pick up moisture from the lake surface, and then drop that moisture over land on the other side of the lake. The mean annual frost-free period—a general measure of the growing-season length for plants and some cold-blooded animals—varies from 60 days at higher elevations in the north to 160 days in lakeshore areas in the south. The climate influences the general distribution of wild plants and animals in the region and also influences the activities and distribution of the human

  4. Development of Petrov glacial-lake system (Tien Shan and outburst risk assessment

    Directory of Open Access Journals (Sweden)

    I. A. Torgoev

    2013-01-01

    Full Text Available Global climate warming causes an intensive melting and retreat of glaciers in the Tien Shan mountains. Melting water of glaciers causes overfilling of high mountain lakes. The increase of the surface and volume of the Petrov Lake accompanied with the decrease of stability of the dam represents an extremely dangerous situation that can produce a natural disaster. Failure can happen due to erosion, a buildup of water pressure, an earthquake or if a large enough portion of a glacier breaks off and massively displaces the waters in a glacial lake at its base. In case of the lake dam rupture, flooding of a disposal site of highly toxic tailing from the gold mine Kumtor is a threat. If this happens, the toxic waste containing cyanides would contaminate a large area in the Naryn (Syrdarya river basin. Even if the flooding of the disposal site does not occur, the damage after lake dam fracture will be immense due to the glacial lake outburst flood may be a devastating mudslide. In order to prevent or reduce the risk of this event we recommend performing engineering surveys for the development and implementation of the project for the controlled reduction of water level in the Blue Bay of the Petrov Lake to a safe volume.

  5. Geophysical investigations of geology and structure at the Martis Creek Dam, Truckee, California

    Science.gov (United States)

    Bedrosian, P.A.; Burton, B.L.; Powers, M.H.; Minsley, B.J.; Phillips, J.D.; Hunter, L.E.

    2012-01-01

    A recent evaluation of Martis Creek Dam highlighted the potential for dam failure due to either seepage or an earthquake on nearby faults. In 1972, the U.S. Army Corps of Engineers constructed this earthen dam, located within the Truckee Basin to the north of Lake Tahoe, CA for water storage and flood control. Past attempts to raise the level of the Martis Creek Reservoir to its design level have been aborted due to seepage at locations downstream, along the west dam abutment, and at the base of the spillway. In response to these concerns, the U.S. Geological Survey has undertaken a comprehensive suite of geophysical investigations aimed at understanding the interplay between geologic structure, seepage patterns, and reservoir and groundwater levels. This paper concerns the geologic structure surrounding Martis Creek Dam and emphasizes the importance of a regional-scale understanding to the interpretation of engineering-scale geophysical data. Our studies reveal a thick package of sedimentary deposits interbedded with Plio-Pleistocene volcanic flows; both the deposits and the flows are covered by glacial outwash. Magnetic field data, seismic tomography models, and seismic reflections are used to determine the distribution and chronology of the volcanic flows. Previous estimates of depth to basement (or the thickness of the interbedded deposits) was 100 m. Magnetotelluric soundings suggest that electrically resistive bedrock may be up to 2500 m deep. Both the Polaris Fault, identified outside of the study area using airborne LiDAR, and the previously unnamed Martis Creek Fault, have been mapped through the dam area using ground and airborne geophysics. Finally, as determined by direct-current resistivity imaging, time-domain electromagnetic sounding, and seismic refraction, the paleotopography of the interface between the sedimentary deposits and the overlying glacial outwash plays a principal role both in controlling groundwater flow and in the distribution of the

  6. Temporary Restoration of Bull Trout Passage at Albeni Falls Dam, 2008 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bellgraph, Brian J. [Pacific Northwest National Laboratory

    2009-03-31

    The goal of this project is to provide temporary upstream passage of bull trout around Albeni Falls Dam on the Pend Oreille River, Idaho. Our specific objectives are to capture fish downstream of Albeni Falls Dam, tag them with combination acoustic and radio transmitters, release them upstream of Albeni Falls Dam, and determine if genetic information on tagged fish can be used to accurately establish where fish are located during the spawning season. In 2007, radio receiving stations were installed at several locations throughout the Pend Oreille River watershed to detect movements of adult bull trout; however, no bull trout were tagged during that year. In 2008, four bull trout were captured downstream of Albeni Falls Dam, implanted with transmitters, and released upstream of the dam at Priest River, Idaho. The most-likely natal tributaries of bull trout assigned using genetic analyses were Grouse Creek (N = 2); a tributary of the Pack River, Lightning Creek (N = 1); and Rattle Creek (N = 1), a tributary of Lightning Creek. All four bull trout migrated upstream from the release site in Priest River, Idaho, were detected at monitoring stations near Dover, Idaho, and were presumed to reside in Lake Pend Oreille from spring until fall 2008. The transmitter of one bull trout with a genetic assignment to Grouse Creek was found in Grouse Creek in October 2008; however, the fish was not found. The bull trout assigned to Rattle Creek was detected in the Clark Fork River downstream from Cabinet Gorge Dam (approximately 13 km from the mouth of Lightning Creek) in September but was not detected entering Lightning Creek. The remaining two bull trout were not detected in 2008 after detection at the Dover receiving stations. This report details the progress by work element in the 2008 statement of work, including data analyses of fish movements, and expands on the information reported in the quarterly Pisces status reports.

  7. The role of dams in development

    International Nuclear Information System (INIS)

    Cakmak, C.

    2001-01-01

    Although the amounts of water resources are enough for the entire world, the distribution of them in time and space shows uneven pattern. The water need is increasing with heavy industrial and agricultural requirements, while available water in the world remains as a fixed source. Economic growth, socio-cultural, and environmental developments are being realized following these changes. In order to achieve sustainable management of water resources, these changes have to be taken into consideration in water-related development projects. Demand for water is steadily increasing through out the world, even though the fresh water resources are limited and unevenly distributed, during the past three centuries, the amount of water withdrawn from fresh water resources has increased by a factor of 35, whereas world population by a factor 8. The engineering of dams, which provides regular water from reservoirs of dams to be used in case of demand pattern, is a vital part of the civilization. Dams have played a key rote in the development since the third millennium B C when the first great civilizations evolved on major rivers, such as Tigris-Euphrates, the Nile and the Indus. From these early times dams were built for flood control, water supply, irrigation and navigation. Dams also had been built to produce motive power and electricity since the industrial revolution. Development priorities changed, experience accumulated with the construction and operation of dams. Although the importance of water is well known in the human life and civilization around the world, still various groups argue that expected economic benefits are not being produced and that major environmental, economic and social costs are not being taken into account. By the end of 20th century, there were 45000 large dams in over 150 countries. According to the same classification there are 625 large dams in Turkey. All over the world, 50 % of the large dams were built mainly for irrigation. It is estimated

  8. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the

  9. A Review of the Integrated Effects of Changing Climate, Land Use, and Dams on Mekong River Hydrology

    Directory of Open Access Journals (Sweden)

    Yadu Pokhrel

    2018-03-01

    Full Text Available The ongoing and proposed construction of large-scale hydropower dams in the Mekong river basin is a subject of intense debate and growing international concern due to the unprecedented and potentially irreversible impacts these dams are likely to have on the hydrological, agricultural, and ecological systems across the basin. Studies have shown that some of the dams built in the tributaries and the main stem of the upper Mekong have already caused basin-wide impacts by altering the magnitude and seasonality of flows, blocking sediment transport, affecting fisheries and livelihoods of downstream inhabitants, and changing the flood pulse to the Tonle Sap Lake. There are hundreds of additional dams planned for the near future that would result in further changes, potentially causing permanent damage to the highly productive agricultural systems and fisheries, as well as the riverine and floodplain ecosystems. Several studies have examined the potential impacts of existing and planned dams but the integrated effects of the dams when combined with the adverse hydrologic consequences of climate change remain largely unknown. Here, we provide a detailed review of the existing literature on the changes in climate, land use, and dam construction and the resulting impacts on hydrological, agricultural, and ecological systems across the Mekong. The review provides a basis to better understand the effects of climate change and accelerating human water management activities on the coupled hydrological-agricultural-ecological systems, and identifies existing challenges to study the region’s Water, Energy, and Food (WEF nexus with emphasis on the influence of future dams and projected climate change. In the last section, we synthesize the results and highlight the urgent need to develop integrated models to holistically study the coupled natural-human systems across the basin that account for the impacts of climate change and water infrastructure development

  10. Dam construction in salt rock

    International Nuclear Information System (INIS)

    Stockmann, N.; Beinlich, A.; Flach, D.; Jockwer, N.; Klarr, K.; Krogmann, P.; Miehe, R.; Schmidt, M.W.; Schwaegermann, H.F.; Walter, F.; Yaramanci, U.

    1991-11-01

    Barriers are a major component of the satefy concept for the Gorleben repository. The construction and performance of dams are currently tested within the framework of a project carried out in the Asse salt mine. A measuring programme has been established to give evidence of the sealing capacities of a barrier consisting of an abatement, long-term sealing material, and a hydraulic sealing system. Tests are to be made to verify the barrier's performance for shorter of long time periods (up to about 500 years). The tests are assisted by computed models established for the project. The long-term safety aspects to be studied include such conditions as permeability changes due to mechanical impacts, circulation conditions at the roadside, and the serviceable life and efficiency of the sealing components. (DG) [de

  11. The Manantali dam. Synthesis report

    International Nuclear Information System (INIS)

    Dickmann, M.; Sieburger, Dr; Ficatier, M.; Naudet, M.; Schmidt, M.; Seve, M.

    2009-01-01

    This report proposes an ex-post assessment of the Manantali dam on the Senegal river and of the related investments in Senegal, in Mauritania and in Mali. After a presentation of the methodology adopted for this assessment study performed by several organisms, the report describes the context and the concerned sectors: project costs and funding, framework for irrigated agriculture, and framework for energy. It discusses the relevance of the project with respect to irrigated agriculture and to energy. It assesses the project performance in terms of efficiency and of viability, and with respect to environmental aspects. It presents an overview of the different direct and indirect sector-based partners which are involved in energy or rural development. The next part proposes an assessment of the global impact of the project on development as far as irrigated agriculture, the energy sector, and regional cooperation and integration are concerned. A set of lessons learned and recommendations are then formulated

  12. Downstream Yangtze River levels impacted by Three Gorges Dam

    International Nuclear Information System (INIS)

    Wang, Jida; Sheng, Yongwei; Gleason, Colin J; Wada, Yoshihide

    2013-01-01

    Changes in the Yangtze River level induced by large-scale human water regulation have profound implications on the inundation dynamics of surrounding lakes/wetlands and the integrity of related ecosystems. Using in situ measurements and hydrological simulation, this study reveals an altered Yangtze level regime downstream from the Three Gorges Dam (TGD) to the Yangtze estuary in the East China Sea as a combined result of (i) TGD’s flow regulation and (ii) Yangtze channel erosion due to reduced sediment load. During the average annual cycle of TGD’s regular flow control in 2009–2012, downstream Yangtze level variations were estimated to have been reduced by 3.9–13.5% at 15 studied gauging stations, manifested as evident level decrease in fall and increase in winter and spring. The impacts on Yangtze levels generally diminished in a longitudinal direction from the TGD to the estuary, with a total time lag of ∼9–12 days. Chronic Yangtze channel erosion since the TGD closure has lowered water levels in relation to flows at most downstream stations, which in turn counteracts the anticipated level increase by nearly or over 50% in winter and spring while reinforcing the anticipated level decrease by over 20% in fall. Continuous downstream channel erosion in the near future may further counteract the benefit of increased Yangtze levels during TGD’s water supplement in winter and accelerate the receding of inundation areas/levels of downstream lakes in fall. (letter)

  13. TYPOLOGY OF LARGE DAMS. A REVIEW

    Directory of Open Access Journals (Sweden)

    Gheorghe ROMANESCU

    2015-06-01

    Full Text Available The dams represent hydrotechnical constructions meant to ensure a judicious use of water resources. The international literature is extremely rich in data regarding the large dams on Earth. In this context, a hierarchy of the main dams is attempted and the role they play in the economic development of the regions they were built in is underlined. The largest dams are built on the big rivers in Asia, North America, South America and Africa. The reservoirs have multiple roles: electricity production, drinking or industrial water supply, irrigations, recreation, etc. High costs and land fragility do not allow the construction of dams in the places most affected by drought or flood. This is why they are usually built in mountainous areas, at great distance from the populated centres. On the Romanian territory, there are 246 large dams, built in the hydrographical basins of Siret, Olt, Arges, Somes, etc. The largest rivers on Earth, by discharge, (Amazon and Zair do not also include the largest dams because the landform and the type of flow have not allowed such constructions.

  14. Sinkhole remediation at Swinging Bridge Dam

    Energy Technology Data Exchange (ETDEWEB)

    Jones, A. [Devine Tarbell and Associates, Portland, ME (United States)

    2009-07-01

    This case history summary described a piping-related sinkhole that occurred after a flood at the Swinging Bridge Dam. The earth-filled embankment dam was constructed using a hydraulic fill technique. A foundation drilling and grouting program was constructed in areas of the dam founded on jointed sandstone and shale. The storage volumes of the reservoir is 32,000 acre-feet. A sinkhole 25 to 300 feet in diameter was observed on May 5, 2005 along the edge of the dam crest. The sinkhole extended to within 10 feet of the reservoir and was separated by a shallow berm of soil and driftwood. Cracking of the crest extended across an area of 180 feet. Operations staff notified the appropriate agencies, implemented a monitoring program, and mobilized construction equipment and sands for use as emergency sinkhole filler. An increase in tailrace turbidity was observed. Historical records for the dam showed significant cracking during the initial filling of the reservoir. Failure modes included increased pore pressures and seepages resulting in the piping of soil along the outside of the dam conduit. Emergency repairs included chemical grouting and weld repairs in the penstocks. A Federal Emergency Management Agency (FEMA) is currently addressing safety issues associated with conduits through dams. 4 refs., 11 figs.

  15. Landslides and dam damage resulting from the Jiuzhaigou earthquake (8 August 2017), Sichuan, China

    Science.gov (United States)

    Zhao, Bo; Wang, Yun-sheng; Luo, Yong-hong; Li, Jia; Zhang, Xin; Shen, Tong

    2018-03-01

    At 21.19 on 8 August 2017, an Ms 7.0 earthquake struck the Jiuzhaigou scenic spot in northwestern Sichuan Province, China. The Jiuzhaigou earthquake is a strike-slip earthquake with a focal depth of 20 km at 33.20° N and 103.82° E, and was caused by two concealed faults. According to emergency investigations and remote sensing interpretations, the Jiuzhaigou earthquake triggered 1780 landslides, damaged one dam (Nuorilang Waterfall) and broke one dam (Huohua Lake). The landslides mainly occurred in the Rize Valley and Shuzheng Valley and in Jiuzhai Paradise. The landslides involved hanging wall and back-slope effects, and the slope angle, slope aspect, seismic faults and valley trend were obviously related to the occurrence of the landslides. Specifically, most of the landslides were shallow landslides, rockfalls and rock avalanches and were small in scale. The failure modes of landslides mainly include wedge rock mass failure, residual deposit failure, relaxed rock mass failure and weathered rock mass failure. The initial low stability of the dam coupled with the topographic effect, back-slope effect and excess pore water pressure led to damage to the Nuorilang Waterfall dam.

  16. Identification of glacier motion and potentially dangerous glacial lakes in the Mt. Everest region/Nepal using spaceborne imagery

    Directory of Open Access Journals (Sweden)

    T. Bolch

    2008-12-01

    Full Text Available Failures of glacial lake dams can cause outburst floods and represents a serious hazard. The potential danger of outburst floods depends on various factors like the lake's area and volume, glacier change, morphometry of the glacier and its surrounding moraines and valley, and glacier velocity. Remote sensing offers an efficient tool for displacement calculations and risk assessment of the identification of potentially dangerous glacial lakes (PDGLs and is especially helpful for remote mountainous areas. Not all important parameters can, however, be obtained using spaceborne imagery. Additional interpretation by an expert is required. ASTER data has a suitable accuracy to calculate surface velocity. Ikonos data offers more detail but requires more effort for rectification. All investigated debris-covered glacier tongues show areas with no or very slow movement rates. From 1962 to 2003 the number and area of glacial lakes increased, dominated by the occurrence and almost linear areal expansion of the moraine-dammed lakes, like the Imja Lake. Although the Imja Lake will probably still grow in the near future, the risk of an outburst flood (GLOF is considered not higher than for other glacial lakes in the area. Potentially dangerous lakes and areas of lake development are identified. There is a high probability of further lake development at Khumbu Glacier, but a low one at Lhotse Glacier.

  17. Estimation of unregulated monthly, annual, and peak streamflows in Forest City Stream and lake levels in East Grand Lake, United States-Canada border between Maine and New Brunswick

    Science.gov (United States)

    Lombard, Pamela J.

    2018-04-30

    The U.S. Geological Survey, in cooperation with the International Joint Commission, compiled historical data on regulated streamflows and lake levels and estimated unregulated streamflows and lake levels on Forest City Stream at Forest City, Maine, and East Grand Lake on the United States-Canada border between Maine and New Brunswick to study the effects on streamflows and lake levels if two or all three dam gates are left open. Historical regulated monthly mean streamflows in Forest City Stream at the outlet of East Grand Lake (referred to as Grand Lake by Environment Canada) fluctuated between 114 cubic feet per second (ft3 /s) (3.23 cubic meters per second [m3 /s]) in November and 318 ft3 /s (9.01 m3 /s) in September from 1975 to 2015 according to Environment Canada streamgaging data. Unregulated monthly mean streamflows at this location estimated from regression equations for unregulated sites range from 59.2 ft3 /s (1.68 m3 /s) in September to 653 ft3 /s (18.5 m3 /s) in April. Historical lake levels in East Grand Lake fluctuated between 431.3 feet (ft) (131.5 meters [m]) in October and 434.0 ft (132.3 m) in May from 1969 to 2016 according to Environment Canada lake level data for East Grand Lake. Average monthly lake levels modeled by using the estimated hydrology for unregulated flows, and an outflow rating built from a hydraulic model with all gates at the dam open, range from 427.7 ft (130.4 m) in September to 431.1 ft (131.4 m) in April. Average monthly lake levels would likely be from 1.8 to 5.4 ft (0.55 to 1.6 m) lower with the gates at the dam opened than they have been historically. The greatest lake level changes would be from June through September.

  18. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural

  19. Sustainability of dams-an evaluation approach

    Science.gov (United States)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the

  20. Investigating leaks in dams and reservoirs

    International Nuclear Information System (INIS)

    2003-01-01

    Millions of people throughout the world depend on dams and reservoirs for electricity, water and flood protection. Dams require significant investment to build and maintain, and yet their usefulness and integrity are constantly threatened by leakage and sedimentation. Isotope hydrology techniques, combined with conventional analytical methods, are a cost-effective tool to reduce such threats. The International Atomic Energy Agency is promoting their use to protect these investments and improve management, particularly by supporting specialized teams of scientists and engineers to investigate dam leakage in African countries on request. (IAEA)

  1. Developing an integrated dam safety program

    International Nuclear Information System (INIS)

    Nielsen, N. M.; Lampa, J.

    1996-01-01

    An effort has been made to demonstrate that dam safety is an integral part of asset management which, when properly done, ensures that all objectives relating to safety and compliance, profitability, stakeholders' expectations and customer satisfaction, are achieved. The means to achieving this integration of the dam safety program and the level of effort required for each core function have been identified using the risk management approach to pinpoint vulnerabilities, and subsequently to focus priorities. The process is considered appropriate for any combination of numbers, sizes and uses of dams, and is designed to prevent exposure to unacceptable risks. 5 refs., 1 tab

  2. Geophysics Methods in Electrometric Assessment of Dams

    Energy Technology Data Exchange (ETDEWEB)

    Davydov, V. A., E-mail: davydov-va@yandex.ru; Baidikov, S. V., E-mail: badikek@mail.ru; Gorshkov, V. Yu., E-mail: vitalaa@yandex.ru; Malikov, A. V., E-mail: alex.mal.1986@mail.ru [Russian Academy of Sciences, Geophysical Institute, Ural Branch (Russian Federation)

    2016-07-15

    The safety assessment of hydraulic structures is proposed to be conducted via geoelectric measurements, which are capable of assessing the health of earth dams in their natural bedding without intervention in their structure. Geoelectric measurements are shown as being capable of pinpointing hazardous parts of a dam, including areas of elevated seepage. Applications of such methods are shown for a number of mini-dams in the Sverdlovsk region. Aparameter (effective longitudinal conductivity) that may be used to monitor the safety of hydraulic structures is proposed. Quantitative estimates of this parameter are given in terms of the degree of safely.

  3. Regional distribution and relevance in paleonvironmental studies of lakes in the Tatra Mts. (Western Carpathians

    Directory of Open Access Journals (Sweden)

    Joanna POCIASK-KARTECZKA

    2014-11-01

    Full Text Available Scientific limnological research in the Tatra Mountains were initiated by Stanislaw Staszic in the early XIX century.  After the World War II, the evolution of Tatra lakes was investigated by Kondracki, Klimaszewski, Baumgart-Kotarba and. Extensive paleolimnological investigations in the Tatra Mountains were started by the group of scientists led by K. Starmach in the beginning of the second half of the 20th century. There has been not much research concerned to the regional distribution of lakes and their properties in the Tatra Mountains (Pociask-Karteczka 2013. Very early division of lakes presented A. Gadomski (1922, which distinguished four types of lakes: a tarns (cirque lake or corrie loch, b bedrock-dammed lakes, c moraine lakes. This division was concerned in subsequent publications (Choiński 2007. M. Lukniš (1973, 1985 recognized additional types: kettles and landslide-dammed lakes and M. Klimaszewski (1988 – inter-sheepback lakes. J. Pacl and K. Wit-Jóźwik in Klima Tatier (Pacl, Wit-Jóźwik 1974 were focused on the temperature of water in lakes in Polish and Slovak parts and M. Borowiak (2000a,b provided a comprehensive analysis of types, dimensions, temperature and chemical composition of water in lakes in the Tatra Mountains.According to present day state of knowledge, one may distinguish following genetic types of lakes: I glacial, II not-glacial. There are four types of the glacial origin lakes in the Tatra Mountains (Fig. 1: a tarns (cirque lakes or corrie loch, b bedrock-moraine dammed lakes, c inter-sheepback lakes, d moraine lakes, e kettles.Most of lakes in the Tatra Mountains are tarns and bedrock-moraine dammed lakes, and they are located at the elevation over 1400 m a.s.l. in the Western Tatra Mountains, and over 1600 m a.s.l. in the High Tatra Mountains. Some of them are paternoster lakes – a series of stair-stepped lakes formed in individual rock basins aligned down the course of a glaciated valley. Lakes in

  4. Predictions of total deformations in Jebba main dam by finite ...

    African Journals Online (AJOL)

    This paper examined the deformations of the Jebba Main Dam, Jebba Nigeria using the finite element method. The study also evaluated the predicted deformations and compared them with the actual deformations in the dam to identify possible causes of the observed longitudinal crack at the dam crest. The Jebba dam is a ...

  5. The geomorphic legacy of small dams — An Austrian study

    NARCIS (Netherlands)

    Poeppl, R.E.; Keesstra, S.D.; Hein, T.

    2015-01-01

    Dams represent one of the most dominant forms of human impact upon fluvial systems during the Anthropocene, as they disrupt the downstream transfer of water and sediments. Removing dams restores river continuity and channel morphology. Both dam construction and dam removal induce geomorphic channel

  6. Evaluating safety of concrete gravity dam on weak rock: Scott Dam

    International Nuclear Information System (INIS)

    Goodman, R.E.; Ahlgren, C.S.

    2000-01-01

    Scott Dam is owned and operated by Pacific Gas and Electric Co. (PG and E) as part of the Potter Valley Project. Although it is an unimpressive concrete gravity dam [233 m (765 ft) long with maximum water surface 33.4 m (110 ft) above tail water], the dam has unusually complex and weak foundation rocks; thick condition caused design changes during construction, numerous subsequent special investigations, and several corrections and additions. A main stumbling block to clarification of the dam safety issue for Scott Dam has always been difficulty in characterizing the foundation material. This paper discusses an approach to this problem as well s how the safety of the dam was subsequently confirmed. Following a comprehensive program of research, investigations, and analysis from 1991 to 1997

  7. What caused the decline of China's largest freshwater lake? Attribution analysis on Poyang Lake water level variations in recent years

    Science.gov (United States)

    Ye, Xuchun; Xu, Chong-Yu; Zhang, Qi

    2017-04-01

    In recent years, dramatic decline of water level of the Poyang Lake, China's largest freshwater lake, has raised wide concerns about the water security and wetland ecosystem. This remarkable hydrological change coincided with several factors like the initial operation of the Three Gorges Dam (TGD) in 2003, the big change of lake bottom topography due to extensive sand mining in the lake since 2000, and also climate change and other human activities in the Yangtze River basin may add to this complexity. Questions raised to what extent that the lake hydrological changes is caused by climate change and/or human activities. In this study, quantitative assessment was conducted to clarify the magnitude and mechanism of specific influencing factors on recent lake decline (2003-2014), with reference to the period of 1980-1999. The attempts were achieved through the reconstruction of lake water level scenarios by the framework of neural network. Major result indicates that the effect of lake bottom topography change due to sand mining activities has became the dominant factor for the recent lake decline, especially in winter season with low water level. However, the effect of TGD regulation shows strong seasonal features, its effect can accounts for 33%-42% of the average water level decline across the lake during the impoundment period of September-October. In addition, the effect of climate change and other human activities over the Yangtze River basin needs to be highly addressed, which is particularly prominent on reducing lake water level during the summer flood season and autumn recession period. The result also revealed that due to different mechanism, the responses of the lake water level to the three influencing factors are not consistent and show great spatial and temporal differences.

  8. Toxicological evaluation of a lake ecosystem contaminated with crude oil

    International Nuclear Information System (INIS)

    Twigg, D.; Ramey, B.

    1995-01-01

    Winona Lake on the Daniel Boone National Forest in Powell County, Kentucky, was used from the mid 1950's to 1987 as a water source for water-injection oil drilling and as a brine disposal site. The lake was contaminated with excessive amounts of crude oil. A multi phase investigation was conducted, including chemical analysis of water and sediment, water toxicity tests using a cladoceran, Ceriodaphnia dubia, sediment toxicity tests using an amphipod, Hyalella azteca, and a faunal survey of the communities of the lake and stream both above and below the lake. The sediment was laden with petroleum hydrocarbons (4.1 parts per thousand), while the water showed no contamination. The C dubia test results showed no significant water toxicity. The contaminated sediment adjacent to the dam produced 75% mortality in H. azteca. The faunal survey indicated little or no impact on the upstream and downstream communities but the lake community was highly impacted, especially the benthos. Pollution tolerant Chaoborus sp. were the only organisms collected from sediment samples dredged from the lake. Contamination was limited to the sediment within the lake but the impact on the entire lake community was severe

  9. Fishing for compliments : man-made lake exceeds expectations

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, L.

    2010-10-15

    This article discussed the unexpected benefits of the first man-made lake created to compensate for loss of habitat resulting from the construction of an oilsands mine. Wapan Sakahikan Lake appears to be diverting birds from a tailings pond in the vicinity, and more fish species than expected are showing up in the lake. Canadian Natural Resources Limited diverted and dammed the Tar River to make way for an oilsands mine. About 30 people were involved in the design and construction of the lake, which encompasses 80 hectares and is 19 feet deep, with shallower areas to facilitate spawning and the maturation of juvenile fish. Small islands, gravel beds, and an underwater trench for small fish to take shelter were also constructed. Special culverts help keep fish in the lake. A metre-deep layer of clay lines the lake to help prevent mercury contamination. With the aid of the spring melt, it took only three days to fill the lake. Nearby First Nations were consulted regarding the location and fish species to stock. Other oilsands companies are now creating compensation lakes, and what was learned in the creation of Wapan Sakahikan will be shared via the Regional Aquatic Monitoring Program. 1 ref., 1 fig.

  10. On the response of large dams to incoherent seismic excitation

    International Nuclear Information System (INIS)

    Ramadan, O.; Novak, M.

    1993-01-01

    An intensive parametric study was conducted to investigate the response of concrete gravity dams to horizontal, spatially variable seismic ground motions. Both segmented dams consisting of separate blocks, or monoliths, and continuous monolithic dams are considered. The study includes the effects of various parameters on system natural frequencies, vibration modes, modal displacement ratios, as well as dam displacements and internal stresses due to spatially variable ground motions. The dam analytical model, and dam response to incoherent ground motions are described. The results show that the dam vibrates almost as a rigid body under the fully correlated waves, but bends and twists significantly under the spatially correlated motions. Dam-foundation interaction magnifies the low frequency components of the dam response, more so for a full reservoir, but decreases the high frequency components. For long dams, the effects of spatially incoherent ground motions are qualitatively different and can be much greater than those due to surface travelling waves. 3 refs., 3 figs

  11. Dam break analysis and flood inundation map of Krisak dam for emergency action plan

    Science.gov (United States)

    Juliastuti, Setyandito, Oki

    2017-11-01

    The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.

  12. 33 CFR 100.1102 - Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam...

    Science.gov (United States)

    2010-07-01

    ... River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). 100.1102 Section... MARINE PARADES SAFETY OF LIFE ON NAVIGABLE WATERS § 100.1102 Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). (a) General. Sponsors are...

  13. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This paper summarizes the conclusions of the annual inspections of French dams in operation (fissures, water oozing, concrete swelling etc..). Only the observations which require a special attention are reported. (J.S.)

  14. Physical - Elwha River Dam Removal Study

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study examines the ecosystem response of the Elwha River to the removal of the Elwha River dams. We will measure the following attributes of ecosystem response:...

  15. Biological - Elwha River Dam Removal Study

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study examines the ecosystem response of the Elwha River to the removal of the Elwha River dams. We will measure the following attributes of ecosystem response:...

  16. Can Dams and Reservoirs Cause Earthquakes?

    Indian Academy of Sciences (India)

    induced earthquakes in that region. Figure 1. A cartoon to illus- trate the spatial relation- ships between dam, reser- ... learning experience for us graduate students. Thus, on that ... infallibility and persuasiveness as in Euclidean geometry. The.

  17. Glacial lakes in the Horgos river basin and their outbreak risk assessment

    Directory of Open Access Journals (Sweden)

    A. P. Medeu

    2013-01-01

    Full Text Available The river Khorgos (in Kazakhstan – Korgas is a boundary river between Kazakhstan and China. Its basin is located in the central part of southern slope of Dzhungarskiy (Zhetysu Alatau range. According to agreement between Kazakhstan and China at the boundary transition of Khorgos in the floodplain of the river Khorgos the large Center of Frontier Cooperation is erected. Estimation of safety of the mentioned object including connection with possible glacial lakes outbursts has the importance of political-economical value. Nowadays development of glacial lakes in the overhead part of Khorgos river basin has reached apogee. As a roof we can mention the maximum of total glacial lakes area (1,7 million m² in 41 lakes and emptied kettles of former glacial lakes. Six lakes reached highly dangerous outburst stage: the volume of lakes reached some million m³, maximum depth up to 30–40 m. Focal ground filtration of the water from lakes takes place. Development of glacial lakes in Khorgos river basin will continue, and these lakes give and will give real danger for the Center of Frontier Cooperation in case of outburst of naturally dammed lake Kazankol with the similar mechanism of Issyk lake outburst, occurred in 1963 in ZailijskiyAlatau (Ile Alatau.

  18. Passage of north temperate fish through the Cowan Dam Denil fishway

    International Nuclear Information System (INIS)

    Christense, B.

    1994-01-01

    Fish passage through a standard Denil fishway under low tailwater conditions was studied at Cowan Dam in Saskatchewan in 1990. In 1991 and 1992, fish passage through an experimental two-level Denil fishway was studied at the same location under similar flow conditions. Six species of fish used the Cowan Dam Denil fishway in 1990: northern pike, walleye, white sucker, longnose sucker, cisco, and lake whitefish. Tag returns suggest that most fish that congregate below Cowan Dam in the spring originate in Lac Ile-a-la-Crosse 150-200 km downstream. Northern pike waited until spawning had been completed before ascending the fishway. Only 12.1% of the pike congregated below the dam are estimated to have ascended the fishway. During 1990 and 1991, the number of pike ascending the fishway appeared to decline as water velocities in the standard and two-level Denil fishways increased. Mean pike length also declined over the period of fish movement, and as water velocities in the standard Denil declined. Walleye did not appear to have any difficulty ascending the standard Denil in 1990, but they did appear to have difficulty ascending the two-level Denil in 1991. Only 29% of the white suckers that ascended the fishway did so prior to spawning. According to recaptures of tagged fish, 58.8% of white suckers present in the tailwater pool ascended the standard Denil in 1990. White suckers also appeared to be able to ascend the two-level Denil without difficulty. Of the longnose suckers, 98% ascended the fishway prior to spawning in 1990, and appeared to ascend both the standard and two-level fishways without obvious delay or difficulty. Only small numbers of cisco and lake whitefish utilized the standard Denil fishway in 1990. 68 refs., 56 figs., 24 tabs

  19. Risk assessment of tailings facility dam failure

    OpenAIRE

    Hadzi-Nikolova, Marija; Mirakovski, Dejan; Stefanova, Violeta

    2011-01-01

    This paper presents the consequences of tailings facility dam failure and therefore the needs for its risk assessment. Tailings are fine-grained wastes of the mining industry, output as slurries, due to mixing with water during mineral processing. Tailings dams vary a lot as it is affected by: tailings characteristics and mill output, site characteristics as: topography, hydrology, geology, groundwater, seismicity and available material and disposal methods. The talings which accumulat...

  20. The environmental impact of large dams

    International Nuclear Information System (INIS)

    Razvan, E.

    1992-01-01

    The campaigns of conservationist groups against dams are generally based on rather emotional issues. This paper puts the situation in a more rational perspective, by analysing the various claims which tend to be put forward concerning the impacts of large dams, examining the validity of the arguments, looking at ways in which any adverse effects can be mitigated, and presenting the complexity of the problems. (author)

  1. Bathymetry of Lake Michigan

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Bathymetry of Lake Michigan has been compiled as a component of a NOAA project to rescue Great Lakes lake floor geological and geophysical data and make it more...

  2. Bathymetry of Lake Ontario

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Bathymetry of Lake Ontario has been compiled as a component of a NOAA project to rescue Great Lakes lake floor geological and geophysical data and make it more...

  3. Bathymetry of Lake Superior

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Bathymetry of Lake Superior has been compiled as a component of a NOAA project to rescue Great Lakes lake floor geological and geophysical data and make it more...

  4. Great Lakes Bathymetry

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Bathymetry of Lakes Michigan, Erie, Saint Clair, Ontario and Huron has been compiled as a component of a NOAA project to rescue Great Lakes lake floor geological and...

  5. Bathymetry of Lake Huron

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Bathymetry of Lake Huron has been compiled as a component of a NOAA project to rescue Great Lakes lake floor geological and geophysical data and make it more...

  6. Estimating flood inundation caused by dam failures

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada). School of Engineering; Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-01-15

    Recent advancements in modelling inundation due to dam failures have allowed easier and more illustrative analyses of potential outcomes. This paper described new model and mapping capabilities available using the HEC-RAS hydraulic model in concert with geographic information systems (GIS). The study area was the upper reaches of Canagagigue Creek and the Woolwich Dam near Elmira, Ontario. A hydraulic analysis of a hypothetical dam failure was developed based on the summer probable maximum flood (PMF) event. Limits extended from Woolwich Dam to downstream of the Town of Elmira. An incoming summer PMF hydrograph was set as the upstream boundary condition in the upstream model. Simulation parameters include simulation time-step; implicit weighting factor; water surface calculation tolerance; and output calculation interval. Peak flows were presented, as well as corresponding flood inundation results through the Town of Elmira. The hydraulic model results were exported to a GIS in order to develop inundation maps for emergency management planning. Results from post-processing included inundation maps for each of the simulated time-steps as well as an inundation animation for the duration of the dam breach. It was concluded that the modelling tools presented in the study can be applied to other dam safety assessment projects in order to develop effective and efficient emergency preparedness plans through public consultation and the establishment of impact zones. 1 tab., 2 figs.

  7. Geodetic deformation monitoring at Pendidikan Diponegoro Dam

    Science.gov (United States)

    Yuwono, Bambang Darmo; Awaluddin, Moehammad; Yusuf, M. A.; Fadillah, Rizki

    2017-07-01

    Deformation monitoring is one indicator to assess the feasibility of Dam. In order to get the correct result of the deformation, it is necessary to determine appropriate deformation monitoring network and the observation data should be analyse and evaluated carefully. Measurement and analysis of deformation requires relatively accurate data and the precision is high enough, one of the observation method that used is GPS (Global Positioning System). The research was conducted at Pendidikan Undip Dams is Dam which is located in Tembang. Diponegoro Dam was built in 2013 and a volume of 50.86 m3 of water, inundation normal width of up to 13,500 m2. The main purpose of these building is not only for drainage but also for education and micro hydro power plant etc. The main goal of this reasearch was to monitor and analyze the deformation at Pendidikan Undip Dam and to determaine whether GPS measurement could meet accuracy requirement for dam deformation measurements. Measurements were made 2 times over 2 years, 2015 and 2016 using dual frequency GPS receivers with static methods and processed by Scientific Software GAMIT 10.6

  8. Expectations of immortality: dam safety management into the next millennium

    International Nuclear Information System (INIS)

    Palmer, M.D.

    1999-01-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs

  9. Hydraulics of embankment-dam breaching

    Science.gov (United States)

    Walder, J. S.; Iverson, R. M.; Logan, M.; Godt, J. W.; Solovitz, S.

    2012-12-01

    Constructed or natural earthen dams can pose hazards to downstream communities. Experiments to date on earthen-dam breaching have focused on dam geometries relevant to engineering practice. We have begun experiments with dam geometries more like those of natural dams. Water was impounded behind dams constructed at the downstream end of the USGS debris-flow flume. Dams were made of compacted, well-sorted, moist beach sand (D50=0.21 mm), 3.5 m from toe to toe, but varying in height from 0.5 to 1 m; the lower the dam, the smaller the reservoir volume and the broader the initially flat crest. Breaching was started by cutting a slot 30-40 mm wide and deep in the dam crest after filling the reservoir. Water level and pore pressure within the dam were monitored. Experiments were also recorded by an array of still- and video cameras above the flume and a submerged video camera pointed at the upstream dam face. Photogrammetric software was used to create DEMs from stereo pairs, and particle-image velocimetry was used to compute the surface-velocity field from the motion of tracers scattered on the water surface. As noted by others, breaching involves formation and migration of a knickpoint (or several). Once the knickpoint reaches the upstream dam face, it takes on an arcuate form whose continued migration we determined by measuring the onset of motion of colored markers on the dam face. The arcuate feature, which can be considered the head of the "breach channel", is nearly coincident with the transition from subcritical to supercritical flow; that is, it acts as a weir that hydraulically controls reservoir emptying. Photogenic slope failures farther downstream, although the morphologically dominant process at work, play no role at all in hydraulic control aside from rare instances in which they extend upstream so far as to perturb the weir, where the flow cross section is nearly self-similar through time. The domain downstream of the critical-flow section does influence

  10. Great Lakes Science Center

    Data.gov (United States)

    Federal Laboratory Consortium — Since 1927, Great Lakes Science Center (GLSC) research has provided critical information for the sound management of Great Lakes fish populations and other important...

  11. Dynamics of glacial lakes in Malaya Almatinka River basin according to the ground-based monitoring data

    Directory of Open Access Journals (Sweden)

    N. N. Kasatkin

    2014-01-01

    Full Text Available Monitoring of three moraine lakes (two of which are located on frontal moraines, and one is lateral lasted some years. It was defined that each lake has individual temperature mode which depends partly by air temperature and much more by incoming melted waters, volumeof their accumulation and typeof underlying rocks. Type of underlying rock in which the lake kettleis formed has decisive importance. Direct contact of lake water with glacierice gives its temperature during ablation period of 2.54 °С or in 3.1 times lower, than in frontal lakes. That’s why the dam quicklycollapses and the lake volume increases. Dams of the lakeslocated on frontal moraines are subject of destructionmuch less. Dynamics of these lakes is caused by retreat of glaciers, and the maximum depths are fixed in the central part of a lake. Water temperatureduring the cold period remainshere steadily positive and promotesformation of filtration channels in the layer with moraine sediments which almost without ice. The increasing of lakes occurs due to ice ablation from the nearest glacier. Precipitations, if they influence to the change of water level in lakes, are not essential.

  12. A Systematic Study of Zerbar Lake Restoration

    Science.gov (United States)

    Hosseini, Reza; Oveis Torabi, Seyed; Forman Asgharzadeh, Deonna

    2017-04-01

    The beautiful lake of Zerbar, located near Marivan City at the west of Iran, is a freshwater lake with an area of 20 km2 and average depth of 5 meters. The lake is created by regional tectonic activities and is mainly fed with natural spring water from bottom. During the past three decades, regional development has caused much disturbance to the natural environment of the lake and its watershed. Rescuing the lake is crucial to the sustainability of the whole region. The study of Zerbar Restoration was performed with the aim to restore its health indicators. Variety of human activities in the watershed, as well as the multidisciplinary nature of lake restoration studies, made it necessary to develop a systematic approach to conduct the study. In Step I of restoration studies, satellite images were investigated to identify the historical changes of watershed during the past 30 years. Meanwhile, documents since 50 years ago were studied. Results indicate that farmland and graze land areas have been relatively constant during the past 50 years. Also, the area of lake, its riparian canes and floating plants have not changed much. In fact, the only significant land use change observed was the significant spread of Marivan City that has stretched toward the lake. The main physical variation to the lake has been elevating the southern edge of the lake by a constructing a landfill dam which was done to control the lake's overflow discharge for irrigation of downstream farmland development. Step II consists of studies performed by disciplines of water resources, hydrogeology, water quality, wetland and watershed ecology, agriculture, animal farming and fishery. Study results indicate that eutrophication (TSL>100), mainly caused by sewage from Marivan City and the surrounding rural areas has been the main reason for lake ecosystem degradation. DPSIR framework, as a novel approach in lake restoration, was applied to synthesize the study results of different disciplines in a

  13. Human action impact on water quality of Juturnaiba Dam - Silva Jardim, RJ

    Directory of Open Access Journals (Sweden)

    Marla Regina Domingues de Morais

    2016-12-01

    Full Text Available The Juturnaiba Dam, located between the municipalities of Silva Jardim and Araruama, is the only fresh water source supplying the entire Lake District, State of Rio de Janeiro. The objective of this research was to evaluate the water quality of the Juturnaiba reservoir through physical, chemical and microbiological analyses conducted upstream and downstream in the rivers, comparing them in to identify its hydrodynamics. Six collections were made in six strategic points. The Capivari river was the tributary with greater restrictions on water quality. The river with better water quality was the São João River.

  14. The Effects of Dams on Downstream Channel Characteristics in Pennsylvania and Maryland: Assessing the Potential Consequences of Dam Removal

    Science.gov (United States)

    Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.

    2003-12-01

    The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.

  15. The role of Lake Dongting in regulating the sediment budget of the Yangtze River

    Directory of Open Access Journals (Sweden)

    Shi-bao Dai

    2005-01-01

    Full Text Available Lake Dongting, the second largest freshwater lake in China and located in the middle reaches of the River Yangtze catchment, was formed at the beginning of the Holocene period by sea level rise and has varied in size with changes in local weather patterns. The sedimentation rate in Lake Dongting during the Holocene is about 50×106 m3 yr-1, or 80×106 t yr-1 (a sand bulk density of 1.6×103 kg m-3, given the sediment deposition rate as 10 mm yr-1 and the average lake size as 5000 km2. By comparing the sediment import and export, it is estimated that the sediment deposition rate of Lake Dongting was 110.6×106 t yr-1 from 1956 to 2003. Siltation and raised embankments reduced the size of the lake and its capacity to accommodate floods. The sediment delivery ratio (SDR of the middle and lower Yangtze is about 0.92 (total sediment output divided by total sediment input given that the total sediment supply into the middle and lower Yangtze is 455.1×106 t yr-1 and the total sediment discharge into the sea is 419×106 t yr-1. Therefore, if it were not for Lake Dongting, the sediment flux at Datong would be 73.6×106 t yr-1 (80×106 t yr-1×0.92 more, an increase of 27% during the Holocene and an increase of 26% to 101.75×106 t yr-1 from 1956 to 2003. Historically, Lake Dongting had a considerable influence in regulating the sediment budget of the Yangtze. However, afforestation and the construction of large dams, such as the Three Gorges Dam, reduced significantly the sediment deposition in Lake Dongting. In 2003, the completion of the Three Gorges Dam and the subsequent impoundment of water reduced the sediment input from the Yangtze and net deposition in Lake Dongting dropped to 25% and 18% of the mean values of the historic records (1956-2003. During the same period, the amount of sediment deposited in Lake Dongting was only 10% of the sediment discharge at Datong. The influence of the sediment deposited in Lake Dongting on the sediment flux to

  16. Contaminated Sediment Management in Dam Removals and River Restoration Efforts: Critical Need for Research and Policy Development

    Science.gov (United States)

    Evans, J. E.

    2015-12-01

    Over 1,000 U.S. dams have been removed (1975-2015) for reasons including obsolescence, liability concerns, water quality upgrades, fisheries, or ecosystem enhancements. Contaminated sediment can significantly complicate the approval process, cost, and timeline of a dam removal, or stop it entirely. In a dam removal, reservoir sediment changes from a sink to a source of contaminants. Recently, the Sierra Club sued to stop the removal of a large dam in Ohio because of the potential impact of phosphate releases on toxic algal blooms in Lake Erie. Heavy metals, PCBs, PAHs, pesticides, and petroleum hydrocarbons can be present in reservoir sediments. In a non-dam removal scenario, reservoir management tools range from "no action" to dredging, dewatering and removal, or sediment capping. But it is not clear how these reservoir management techniques apply to dam removals. Case studies show typically >80% of the reservoir sediment is eventually eroded, precluding sediment capping as a containment option. However, the released contaminants are diluted by mixing with "clean" sediment and are transported to different physio-chemical environments which may immobilize or biodegrade the contaminants. Poorly understood options include phased drawdown/reseeding the former reservoir to contain sediments, diking contaminant "hot spots," and addressing contaminant stratigraphy (where historical use created "hot layers" in the reservoir sediment). Research and policy development needs include: (1) assessment methods based on synergistic effects of multiple contaminants being present; (2) ways to translate the pre-removal contaminant concentrations to post-removal health risks downstream; (3) evaluation of management practices for contaminant "hot spots" and "hot layers;" (4) tools to forecast the presence of contaminated sediment using easily accessible information; and (5) ways to limit liability risk for organizations participating in dam removals involving contaminated sediment.

  17. the effect of age of dam on weaning mass for ftve dam breed types

    African Journals Online (AJOL)

    SUMMARY: The effect of age of dam on adjusted 210 day calf weaning mass was estimated by the Least Squares method for 5 dam types on 2 farms. ... the later maturing breeds would have a low level of productivity because these cows would be eliminated in their potentially prime .... time at 28 (2A) or 3l (28) months old.

  18. The interplay of activists and dam developers : the case of Myanmar’s mega-dams

    NARCIS (Netherlands)

    Kirchherr, Julian|info:eu-repo/dai/nl/411261487; J. Charles, Katrina; Walton, Matthew J.

    2017-01-01

    Scholars investigating activism against large dam developments in Asia usually focus on those campaigning, but not on those the campaigns are aimed at–the dam developers. Yet the developers’ perspective is crucial to comprehensively understand the dynamics of social and environmental activism in

  19. Dam that social networking: connecting South Africa's major dams to social media

    CSIR Research Space (South Africa)

    Butgereit, L

    2011-10-01

    Full Text Available where four major South African dams are connected to Twitter and Facebook (and other social media such as MXit and Google Chat) in a mechanism which would be easy to replicate for additional dams or rivers. Data is supplied by the South African...

  20. Lake Cadagno

    DEFF Research Database (Denmark)

    Tonolla, Mauro; Storelli, Nicola; Danza, Francesco

    2017-01-01

    cycles. The chemocline lies at about 12 m depth, stabilized by density differences of salt-rich water supplied by sub-aquatic springs to the monimolimnion and of electrolyte-poor surface water feeding the mixolimnion. Steep sulphide and light gradients in the chemocline support the growth of a large...... in the chemocline. Small-celled PSB together with the sulfate-reducing bacterium Desulfocapsa thiozymogenes sp. form stable aggregates in the lake, which represent small microenvironments with an internal sulphur cycle. Eukaryotic primary producers in the anoxic zones are dominated by Cryptomonas phaseolus...

  1. Modeling the capacity of riverscapes to support beaver dams

    Science.gov (United States)

    Macfarlane, William W.; Wheaton, Joseph M.; Bouwes, Nicolaas; Jensen, Martha L.; Gilbert, Jordan T.; Hough-Snee, Nate; Shivik, John A.

    2017-01-01

    The construction of beaver dams facilitates a suite of hydrologic, hydraulic, geomorphic, and ecological feedbacks that increase stream complexity and channel-floodplain connectivity that benefit aquatic and terrestrial biota. Depending on where beaver build dams within a drainage network, they impact lateral and longitudinal connectivity by introducing roughness elements that fundamentally change the timing, delivery, and storage of water, sediment, nutrients, and organic matter. While the local effects of beaver dams on streams are well understood, broader coverage network models that predict where beaver dams can be built and highlight their impacts on connectivity across diverse drainage networks are lacking. Here we present a capacity model to assess the limits of riverscapes to support dam-building activities by beaver across physiographically diverse landscapes. We estimated dam capacity with freely and nationally-available inputs to evaluate seven lines of evidence: (1) reliable water source, (2) riparian vegetation conducive to foraging and dam building, (3) vegetation within 100 m of edge of stream to support expansion of dam complexes and maintain large colonies, (4) likelihood that channel-spanning dams could be built during low flows, (5) the likelihood that a beaver dam is likely to withstand typical floods, (6) a suitable stream gradient that is neither too low to limit dam density nor too high to preclude the building or persistence of dams, and (7) a suitable river that is not too large to restrict dam building or persistence. Fuzzy inference systems were used to combine these controlling factors in a framework that explicitly also accounts for model uncertainty. The model was run for 40,561 km of streams in Utah, USA, and portions of surrounding states, predicting an overall network capacity of 356,294 dams at an average capacity of 8.8 dams/km. We validated model performance using 2852 observed dams across 1947 km of streams. The model showed

  2. Estimating Water Balance Components of Lakes and Reservoirs Using Various Open Access Satellite Databases

    NARCIS (Netherlands)

    Duan, Z.

    2014-01-01

    There are millions of lakes and ten thousands of reservoirs in the world. The number of reservoirs is still increasing through the construction of large dams to meet the growing demand for water resources, hydroelectricity and economic development. Accurate information on the water balance

  3. The origin and evolution of Iskanderkul Lake in the western Tien Shan and related geomorphic hazards

    Czech Academy of Sciences Publication Activity Database

    Emmer, Adam; Kalvoda, J.

    2017-01-01

    Roč. 99, č. 2 (2017), s. 139-154 ISSN 0435-3676 R&D Projects: GA MŠk(CZ) LO1415 Institutional support: RVO:86652079 Keywords : iskanderkul lake * rockslide dam * outburst flood * tien shan Subject RIV: EH - Ecology, Behaviour OBOR OECD: Environmental sciences (social aspects to be 5.7) Impact factor: 1.302, year: 2016

  4. The Total Risk Analysis of Large Dams under Flood Hazards

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2018-02-01

    Full Text Available Dams and reservoirs are useful systems in water conservancy projects; however, they also pose a high-risk potential for large downstream areas. Flood, as the driving force of dam overtopping, is the main cause of dam failure. Dam floods and their risks are of interest to researchers and managers. In hydraulic engineering, there is a growing tendency to evaluate dam flood risk based on statistical and probabilistic methods that are unsuitable for the situations with rare historical data or low flood probability, so a more reasonable dam flood risk analysis method with fewer application restrictions is needed. Therefore, different from previous studies, this study develops a flood risk analysis method for large dams based on the concept of total risk factor (TRF used initially in dam seismic risk analysis. The proposed method is not affected by the adequacy of historical data or the low probability of flood and is capable of analyzing the dam structure influence, the flood vulnerability of the dam site, and downstream risk as well as estimating the TRF of each dam and assigning corresponding risk classes to each dam. Application to large dams in the Dadu River Basin, Southwestern China, demonstrates that the proposed method provides quick risk estimation and comparison, which can help local management officials perform more detailed dam safety evaluations for useful risk management information.

  5. Hydrogeophysical investigations at Hidden Dam, Raymond, California

    Science.gov (United States)

    Minsley, Burke J.; Burton, Bethany L.; Ikard, Scott; Powers, Michael H.

    2011-01-01

    Self-potential and direct current resistivity surveys are carried out at the Hidden Dam site in Raymond, California to assess present-day seepage patterns and better understand the hydrogeologic mechanisms that likely influence seepage. Numerical modeling is utilized in conjunction with the geophysical measurements to predict variably-saturated flow through typical two-dimensional dam cross-sections as a function of reservoir elevation. Several different flow scenarios are investigated based on the known hydrogeology, as well as information about typical subsurface structures gained from the resistivity survey. The flow models are also used to simulate the bulk electrical resistivity in the subsurface under varying saturation conditions, as well as the self-potential response using petrophysical relationships and electrokinetic coupling equations.The self-potential survey consists of 512 measurements on the downstream area of the dam, and corroborates known seepage areas on the northwest side of the dam. Two direct-current resistivity profiles, each approximately 2,500 ft (762 m) long, indicate a broad sediment channel under the northwest side of the dam, which may be a significant seepage pathway through the foundation. A focusing of seepage in low-topography areas downstream of the dam is confirmed from the numerical flow simulations, which is also consistent with past observations. Little evidence of seepage is identified from the self-potential data on the southeast side of the dam, also consistent with historical records, though one possible area of focused seepage is identified near the outlet works. Integration of the geophysical surveys, numerical modeling, and observation well data provides a framework for better understanding seepage at the site through a combined hydrogeophysical approach.

  6. Alpine hydropower schemes and their 'remote influence' on lakes and rivers downstream

    International Nuclear Information System (INIS)

    Wuest, A.

    2003-01-01

    This article discusses the effect that alpine dams and reservoirs have on lakes and rivers in the lowlands. Not only the contribution of Swiss alpine hydropower installations to Switzerland's electricity generation capacity is mentioned, but also the way they 'export' ecological deficits to lower-lying regions. Examples of this are quoted, including, for example, the filtering-out of around 50% of water-borne particles in the river Rhone by the dams in its catchment area. The consequences of such effects for the ecology of lakes and rivers are discussed. Further examples of how the alpine dams hold back nutrients and regulate the flow and temperature of rivers are given and the resulting ecological effects are commented on

  7. Bottom Topographic Changes of Poyang Lake During Past Decade Using Multi-temporal Satellite Images

    Science.gov (United States)

    Zhang, S.

    2015-12-01

    Poyang Lake, as a well-known international wetland in the Ramsar Convention List, is the largest freshwater lake in China. It plays crucial ecological role in flood storage and biological diversity. Poyang Lake is facing increasingly serious water crises, including seasonal dry-up, decreased wetland area, and water resource shortage, all of which are closely related to progressive bottom topographic changes over recent years. Time-series of bottom topography would contribute to our understanding of the lake's evolution during the past several decades. However, commonly used methods for mapping bottom topography fail to frequently update quality bathymetric data for Poyang Lake restricted by weather and accessibility. These deficiencies have limited our ability to characterize the bottom topographic changes and understanding lake erosion or deposition trend. To fill the gap, we construct a decadal bottom topography of Poyang Lake with a total of 146 time series medium resolution satellite images based on the Waterline Method. It was found that Poyang Lake has eroded with a rate of -14.4 cm/ yr from 2000 to 2010. The erosion trend was attributed to the impacts of human activities, especially the operation of the Three Gorge Dams, sand excavation, and the implementation of water conservancy project. A decadal quantitative understanding bottom topography of Poyang Lake might provide a foundation to model the lake evolutionary processes and assist both researchers and local policymakers in ecological management, wetland protection and lake navigation safety.

  8. 3-D CFD simulations of hydrodynamics in the Sulejow dam reservoir

    Directory of Open Access Journals (Sweden)

    Ziemińska-Stolarska Aleksandra

    2015-12-01

    Full Text Available This paper reports the processes by which a single-phase 3-D CFD model of hydrodynamics in a 17-km-long dam reservoir was developed, verified and tested. A simplified VOF model of flow was elaborated to determine the effect of wind on hydrodynamics in the lake. A hexahedral mesh with over 17 million elements and a k-ω SST turbulence model were defined for single-phase simulations in steady-state conditions. The model was verified on the basis of the extensive flow measurements (StreamPro ADCP, USA. Excellent agreement (average error of less than 10% between computed and measured velocity profiles was found. The simulation results proved a strong effect of wind on hydrodynamics in the lake, especially on the development of the water circulation pattern in the lacustrine zone.

  9. Influence of unreasoned economic activity on the condition of macrophytes of the Bol’shoye Goluboye Lake

    Science.gov (United States)

    Palagushkina, O. V.; Zaripova, N. R.; Mingazova, N. M.; Yarutkin, T. O.

    2018-01-01

    The ecosystem of Lake Bolshoye Goluboe had undergone a strong anthropogenic impact in 2013 as a result of the implementation of the dam reconstruction project. Studies in 2014 have shown that the implementation of the project for the reconstruction of the Bolshoye Goluboe dam has negatively affected on the species richness of macrophytes. The total species composition of the lake and species richness of the water core decreased twofold, Hippuris vulgaris L., Zannichellia palustris L, Ceratophyllum demersum L., and the species listed in the Red Book of the Republic of Tatarstan - Batrachium circinatum (Sibth.) Spach disappeared from the species composition. The area occupied by macrophyte communities has decreased by 55%.

  10. Ice interactions at a dam face

    Energy Technology Data Exchange (ETDEWEB)

    Morse, B.; Morse, J.; Beaulieu, P.; Pratt, Y. [Laval Univ., Quebec City, PQ (Canada). Dept. of Civil Engineering; Stander, E. [State Univ. of New York, Cobleskill College, Cobleskill, NY (United States). Dept. of Natural Sciences; Cote, A.; Tarras, A.; Noel, P. [Hydro-Quebec, Varennes, PQ (Canada). IREQ

    2009-07-01

    This paper reported on a joint research project between Laval University and Hydro-Quebec to study ice forces on dams in an effort to harmonize design criteria and develop mitigation strategies. This paper introduced the project and explored some of the preliminary results of the 2007-2008 field season. Ice displacement, ice stresses and ice forces on the LaGabelle dam were measured at several locations. The paper identified and discussed the complex relationships between data sets and discussed the spatial-temporal variability of the ice forces and its impact on design criteria. The project objective was to develop design criteria for ice forces on dams and to provide a scientific basis for interpreting and harmonizing existing recommended criteria. The methodology and site description were presented. It was concluded that the ice processes in a reservoir near a dam face subject to water fluctuations are quite complex. Therefore, in order to know the real average pressure on the dam, a significant amount of panels are required, having important implications for determining safe design values. 9 refs., 10 figs.

  11. Grouting of karstic arch dam foundation

    Energy Technology Data Exchange (ETDEWEB)

    Young, J.; Rigbey, S. [Acres International, Niagara Falls, ON (Canada)

    2002-07-01

    A 200 m high arch dam and a 2000 MW underground power house complex is under development in the Middle East. The project is located in a highly seismic area in rugged, mountainous terrain. The arch dam is constructed on good quality limestone and dolomitic limestone rock mass, but it contains several zones of disturbed or sheared rock. The basement rock is slightly karstic with hydraulic conductivities in the order of 100 Lugeons. In order to get a satisfactory foundation surface for the dam, it will be necessary to excavate extensively and backfill with concrete. Because of the presence of many clay infilled cavities and fractures, geotechnicians are considering the installation of a multiple row grout curtain to a depth of 150 m below the dam foundation to ensure adequate seepage and uplift parameters when the reservoir is impounded. Initial grouting water pressure test results suggested that the grouting and drainage curtain should be extended to the left abutment beyond the current design. However, when horizontal slide models of the dam abutment were developed using the finite element program SEEPW, it was shown that there is no benefit to extending the length of grout curtains unless they are tied to an area of much lower hydraulic conductivity much deeper in the abutment. 1 tab., 5 figs.

  12. Incorporation of Fine-Grained Sediment Erodibility Measurements into Sediment Transport Modeling, Capitol Lake, Washington

    Science.gov (United States)

    Stevens, Andrew W.; Gelfenbaum, Guy; Elias, Edwin; Jones, Craig

    2008-01-01

    Capitol Lake was created in 1951 with the construction of a concrete dam and control gate that prevented salt-water intrusion into the newly formed lake and regulated flow of the Deschutes River into southern Puget Sound. Physical processes associated with the former tidally dominated estuary were altered, and the dam structure itself likely caused an increase in retention of sediment flowing into the lake from the Deschutes River. Several efforts to manage sediment accumulation in the lake, including dredging and the construction of sediment traps upriver, failed to stop the lake from filling with sediment. The Deschutes Estuary Feasibility Study (DEFS) was carried out to evaluate the possibility of removing the dam and restoring estuarine processes as an alternative ongoing lake management. An important component of DEFS was the creation of a hydrodynamic and sediment transport model of the restored Deschutes Estuary. Results from model simulations indicated that estuarine processes would be restored under each of four restoration alternatives, and that over time, the restored estuary would have morphological features similar to the predam estuary. The model also predicted that after dam-removal, a large portion of the sediment eroded from the lake bottom would be deposited near the Port of Olympia and a marina located in lower Budd Inlet seaward of the present dam. The volume of sediment transported downstream was a critical piece of information that managers needed to estimate the total cost of the proposed restoration project. However, the ability of the model to predict the magnitude of sediment transport in general and, in particular, the volume of sediment deposition in the port and marina was limited by a lack of information on the erodibility of fine-grained sediments in Capitol Lake. Cores at several sites throughout Capitol Lake were collected between October 31 and November 1, 2007. The erodibility of sediments in the cores was later determined in the

  13. Suspended-sediment budget, flow distribution, and lake circulation for the Fox Chain of Lakes in Lake and McHenry Counties, Illinois, 1997-99

    Science.gov (United States)

    Schrader, David L.; Holmes, Robert R.

    2000-01-01

    The Fox Chain of Lakes is a glacial lake system in McHenry and Lake Counties in northern Illinois and southern Wisconsin. Sedimentation and nutrient overloading have occurred in the lake system since the first dam was built (1907) in McHenry to raise water levels in the lake system. Using data collected from December 1, 1997, to June 1, 1999, suspended-sediment budgets were constructed for the most upstream lake in the system, Grass Lake, and for the lakes downstream from Grass Lake. A total of 64,900 tons of suspended sediment entered Grass Lake during the study, whereas a total of 70,600 tons of suspended sediment exited the lake, indicating a net scour of 5,700 tons of sediment. A total of 44,100 tons of suspended sediment was measured exiting the Fox Chain of Lakes at Johnsburg, whereas 85,600 tons entered the system downstream from Grass Lake. These suspended-sediment loads indicate a net deposition of 41,500 tons downstream from Grass Lake, which represents a trapping efficiency of 48.5 percent. A large amount of recreational boating takes place on the Fox Chain of Lakes during summer months, and suspended-sediment load was observed to rise from 110 tons per day to 339 tons per day during the 1999 Memorial Day weekend (May 26 ?31, 1999). Presumably, this rise was the result of the boating traffic because no other hydrologic event is known to have occurred that might have caused the rise. This study covers a relatively short period and may not represent the long-term processes of the Fox Chain of Lakes system, although the sediment transport was probably higher than an average year. The bed sediments found on the bottom of the lakes are composed of mainly fine particles in the silt-clay range. The Grass Lake sediments were characterized as black peat with an organic content of between 9 and 18 percent, and the median particle size ranged from 0.000811 to 0.0013976 inches. Other bed material samples were collected at streamflow-gaging stations on the

  14. Magnetometric investigation of glaciers Southern and Northern Inylchek adjacent to the Merzbacher Lake

    Directory of Open Access Journals (Sweden)

    А. Shakirov

    2015-01-01

    Full Text Available Results of areal magnetometric investigation of glaciers South and North Enilchek located in the vicinity of the Merzbaher Lake are presented. These stud- ies resulted in finding of the bow-shaped rock bar (riegel under the South Enilchek Glacier that became one of causes to turn its right flows toward the Merz- bacher Lake. Under the North Enilchek glacier the horseshoe-shaped riegel ledge was also detected, and that one created a barrier to accumulation of bottom sediments and, thus, formed a distinctive soil alluvial dam, which promoted formation of rather wide interface between upper and lower parts of the Merz- bacher Lake

  15. Glacial lakes in South Tyrol: distribution, evolution and potential for GLOFs

    Science.gov (United States)

    Schug, Marie-Claire; Mergili, Martin

    2017-04-01

    All over the world glaciers are currently retreating, leading to the formation or growth of glacial lakes. Some of these lakes are susceptible to sudden drainage. In order to assess the danger of glacial lake outburst floods (GLOFs) in South Tyrol in the Italian Alps, we present (i) an inventory of lakes, (ii) an analysis of the development of selected glacial lakes since 1945, and (iii) the susceptibility to and the possible impact areas of GLOFs. The inventory includes 1010 lakes that are larger than 250 m2 at an elevation above 2000 m asl, most of them of glacial origin. These lakes are mapped manually from orthophotos. Apart from collecting information on the spatial distribution of these lakes, the inventory lists dam material, glacier contact, and further parameters. 89% of the lakes in the investigation area are impounded by bedrock, whereas 93% of the lakes are detached from the associated glacier. The majority of lakes is small to medium sized (selected lakes are analyzed in detail in the field and from multi-temporal orthophotos, including the development of lake size and surroundings in the period since 1945. The majority of the selected lakes, however, was first recorded on orthophotos from the early 1980s. Eight of ten lakes grew significantly in that period. But when the lakes detached from the glacier until the early 2000s, the growth slowed down or ceased. Based on the current development of the selected lakes we conclude that the close surroundings of these lakes have stabilised and the lakes' susceptibility to an outburst has thus decreased. We further conduct broad-scale analyses of the susceptibility of the mapped lakes to GLOFs, and of the potential reach of possible GLOFs. The tool r.glachaz is used to determine the potentially dangerous lakes. Even though some few lakes require closer attention, the overall susceptibility to GLOFs in South Tyrol is relatively low, as most lakes are impounded by bedrock. In some cases, GLOFs caused by impact

  16. Analysis of past and future dam formation and failure in the Santa Cruz River (San Juan province, Argentina)

    Science.gov (United States)

    Penna, Ivanna M.; Derron, Marc-Henri; Volpi, Michele; Jaboyedoff, Michel

    2013-03-01

    Around 11.5 ∗ 106 m3 of rock detached from the eastern slope of the Santa Cruz valley (San Juan province, Argentina) in the first fortnight of January 2005. The rockslide-debris avalanche blocked the course, resulting in the development of a lake with maximum length of around 3.5 km. The increase in the inflow rate from 47,000-74,000 m3/d between April and October to 304,000 m3/d between late October and the first fortnight of November, accelerated the growing rate of the lake. On 12 November 2005 the dam failed, releasing 24.6 ∗ 106 m3 of water. The resulting outburst flood caused damages mainly on infrastructure, and affected the facilities of a hydropower dam which was under construction 250 km downstream from the source area. In this work we describe causes and consequences of the natural dam formation and failure, and we dynamically model the 2005 rockslide-debris avalanche with DAN3D. Additionally, as a volume ~ 24 ∗ 106 m3of rocks still remain unstable in the slope, we use the results of the back analysis to forecast the formation of a future natural dam. We analyzed two potential scenarios: a partial slope failure of 6.5 ∗ 106 m3 and a worst case where all the unstable volume remaining in the slope fails. The spreading of those potential events shows that a new blockage of the Santa Cruz River is likely to occur. According to their modeled morphometry and the contributing watershed upstream the blockage area, as the one of 2005, the dams would also be unstable. This study shows the importance of back and forward analysis that can be carried out to obtain critical information for land use planning, hazards mitigation, and emergency management.

  17. Dams, Hydrology and Risk in Future River Management

    Science.gov (United States)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  18. The big issue: environment and large dams

    International Nuclear Information System (INIS)

    Rogers, Peter

    1999-01-01

    Some of the environmental issues associated with large dams are discussed. Prior to commencement of construction of the Three Gorges dam in China in 1993, 50 years of planning and 20 years of environmental argument had taken place. The Chinese were conscious of the need to consider the environmental issues as a factor in attracting foreign investment for the world's biggest and most expensive dam. While the resettlement issues (1.2 M people were resettled) have dominated the current arguments, the other important issues are environment, economics and safety. Despite criticism from environmentalists, both at home and abroad, the Chinese went ahead with the project. With regard to resettlement, the Chinese appear to be much more considerate than some other countries in providing housing and agricultural land. Perhaps the main losses were suffered by cultural heritage sites and aquatic systems, rather than by the resettled population. (UK)

  19. The big issue: environment and large dams

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Peter [Harvard Univ. (United States)

    1999-09-01

    Some of the environmental issues associated with large dams are discussed. Prior to commencement of construction of the Three Gorges dam in China in 1993, 50 years of planning and 20 years of environmental argument had taken place. The Chinese were conscious of the need to consider the environmental issues as a factor in attracting foreign investment for the world's biggest and most expensive dam. While the resettlement issues (1.2 M people were resettled) have dominated the current arguments, the other important issues are environment, economics and safety. Despite criticism from environmentalists, both at home and abroad, the Chinese went ahead with the project. With regard to resettlement, the Chinese appear to be much more considerate than some other countries in providing housing and agricultural land. Perhaps the main losses were suffered by cultural heritage sites and aquatic systems, rather than by the resettled population. (UK)

  20. Cleveland Dam East Abutment : seepage control project

    Energy Technology Data Exchange (ETDEWEB)

    Huber, F.; Siu, D. [Greater Vancouver Regional District, Burnaby, BC (Canada); Ahlfield, S.; Singh, N. [Klohn Crippen Consultants Ltd., Vancouver, BC (Canada)

    2004-09-01

    North Vancouver's 91 meter high Cleveland Dam was built in the 1950s in a deep bedrock canyon to provide a reservoir for potable water to 18 municipalities. Flow in the concrete gravity dam is controlled by a gated spillway, 2 mid-level outlets and intakes and 2 low-level outlets. This paper describes the seepage control measures that were taken at the time of construction as well as the additional measures that were taken post construction to control piezometric levels, seepage and piping and slope instability in the East Abutment. At the time of construction, a till blanket was used to cover the upstream reservoir slope for 200 meters upstream of the dam. A single line grout curtain was used through the overburden from ground surface to bedrock for a distance of 166 meters from the dam to the East Abutment. Since construction, the safety of the dam has been compromised through changes in piezometric pressure, seepage and soil loss. Klohn Crippen Consultants designed a unique seepage control measure to address the instability risk. The project involved excavating 300,000 cubic meters of soil to form a stable slope and construction bench. A vertical wall was constructed to block seepage. The existing seepage control blanket was also extended by 260 meters. The social, environmental and technical issues that were encountered during the rehabilitation project are also discussed. The blanket extension construction has met design requirements and the abutment materials that are most susceptible to internal erosion have been covered by non-erodible blanket materials such as plastic and roller-compacted concrete (RCC). The project was completed on schedule and within budget and has greatly improved the long-term stability of the dam and public safety. 2 refs., 8 figs.

  1. Limnology of Eifel maar lakes

    National Research Council Canada - National Science Library

    Scharf, Burkhard W; Björk, Sven

    1992-01-01

    ... & morphometry - Physical & chemical characteristics - Calcite precipitation & solution in Lake Laacher See - Investigations using sediment traps in Lake Gemundener Maar - Phytoplankton of Lake Weinfelder Maar...

  2. Glacial lakes in Austria - Distribution and formation since the Little Ice Age

    Science.gov (United States)

    Buckel, J.; Otto, J. C.; Prasicek, G.; Keuschnig, M.

    2018-05-01

    Glacial lakes constitute a substantial part of the legacy of vanishing mountain glaciation and act as water storage, sediment traps and sources of both natural hazards and leisure activities. For these reasons, they receive growing attention by scientists and society. However, while the evolution of glacial lakes has been studied intensively over timescales tied to remote sensing-based approaches, the longer-term perspective has been omitted due a lack of suitable data sources. We mapped and analyzed the spatial distribution of glacial lakes in the Austrian Alps. We trace the development of number and area of glacial lakes in the Austrian Alps since the Little Ice Age (LIA) based on a unique combination of a lake inventory and an extensive record of glacier retreat. We find that bedrock-dammed lakes are the dominant lake type in the inventory. Bedrock- and moraine-dammed lakes populate the highest landscape domains located in cirques and hanging valleys. We observe lakes embedded in glacial deposits at lower locations on average below 2000 m a.s.l. In general, the distribution of glacial lakes over elevation reflects glacier erosional and depositional dynamics rather than the distribution of total area. The rate of formation of new glacial lakes (number, area) has continuously accelerated over time with present rates showing an eight-fold increase since LIA. At the same time the total glacier area decreased by two-thirds. This development coincides with a long-term trend of rising temperatures and a significant stepping up of this trend within the last 20 years in the Austrian Alps.

  3. Water level management of lakes connected to regulated rivers: An integrated modeling and analytical methodology

    Science.gov (United States)

    Hu, Tengfei; Mao, Jingqiao; Pan, Shunqi; Dai, Lingquan; Zhang, Peipei; Xu, Diandian; Dai, Huichao

    2018-07-01

    Reservoir operations significantly alter the hydrological regime of the downstream river and river-connected lake, which has far-reaching impacts on the lake ecosystem. To facilitate the management of lakes connected to regulated rivers, the following information must be provided: (1) the response of lake water levels to reservoir operation schedules in the near future and (2) the importance of different rivers in terms of affecting the water levels in different lake regions of interest. We develop an integrated modeling and analytical methodology for the water level management of such lakes. The data-driven method is used to model the lake level as it has the potential of producing quick and accurate predictions. A new genetic algorithm-based synchronized search is proposed to optimize input variable time lags and data-driven model parameters simultaneously. The methodology also involves the orthogonal design and range analysis for extracting the influence of an individual river from that of all the rivers. The integrated methodology is applied to the second largest freshwater lake in China, the Dongting Lake. The results show that: (1) the antecedent lake levels are of crucial importance for the current lake level prediction; (2) the selected river discharge time lags reflect the spatial heterogeneity of the rivers' impacts on lake level changes; (3) the predicted lake levels are in very good agreement with the observed data (RMSE ≤ 0.091 m; R2 ≥ 0.9986). This study demonstrates the practical potential of the integrated methodology, which can provide both the lake level responses to future dam releases and the relative contributions of different rivers to lake level changes.

  4. Temporal-Spatial Evolution Analysis of Lake Size-Distribution in the Middle and Lower Yangtze River Basin Using Landsat Imagery Data

    Directory of Open Access Journals (Sweden)

    Lin Li

    2015-08-01

    Full Text Available Four natural lakes in the middle and lower reaches of the Yangtze River—Dongting Lake, Poyang Lake, Chaohu Lake and Taihu Lake—play a key role in the climate, environment, and ecology of this area. Upstream of these lakes, the Three Gorges Dam Project has been storing water for 12 years. Future monitoring and management of rivers and lakes can certainly benefit from research on the patterns of variation of natural lakes downstream of the Three Gorges Project. This research applies Landsat TM/ETM data to evaluate water area changes in the four lakes from 2002 to 2013. The water area is estimated using AWEI (Automated Water Extraction Index from satellite images. The average areas decreased respectively 452, 11, and 5 km2 (29.6%, 1.4% and 0.2% from 2002 to 2013 for Dongting, Chaohu, and Taihu Lakes. Meanwhile, it increased 300 km2 (11.0% for Poyang Lake. Precipitation and changes in river inflow may account for the fluctuation in the surface area to a large degree, especially between 2009 and 2013. The present study was undertaken to characterize the evolution of lakes and to explore the potential driving force of variation in order to assist the management of dams upstream in the river basin.

  5. Hydroelectric dams need billions for rehab

    International Nuclear Information System (INIS)

    Carr, F.H.; Soast, A.

    1993-01-01

    Many of the Corps of Engineers older hydroelectric dams will require major rehabilitation over the next ten years. Preventive maintenance, repair work, and major rehabilitation of the Corp's hydro dams in inadequate because the revenue generated by sales of electricity, by law, is returned to the Treasury. Most multimillion dollar rehabilitation projects require specific approval for funding by Congress and securing it is a long and difficult process. It is hoped the funding problem will soon be addressed by the Clinton administration. Already, nearly one-sixth of the 2,154 Mw of hydro is unavailable because with hydro units are either out of service or operating at less than full capacity

  6. Official opening of the Olympic Dam project

    International Nuclear Information System (INIS)

    Parbo, A.

    1989-01-01

    This is the text of an address given on November 5, 1988 to mark the commencement of production of copper, uranium, gold and silver from the first stage of the Olympic Dam project at Roxby Downs, South Australia. The huge deposit was discovered in 1975 and years of exploration, underground development, metallurgical testing, planning and establishing the infrastructure followed, at a cost of $750 million. 740 people are now employed at Olympic Dam. The first shipment of copper and uranium oxide left for Sweden at the end of November 1988. The deposit is able to support a much higher production rate as the market for the products, particularly uranium, improves

  7. Dam safety at Seven Sisters Generating Station

    International Nuclear Information System (INIS)

    Carson, R. W.; Gupta, R. C.

    1996-01-01

    A safety surveillance program for all hydraulic structures in Manitoba was first implemented in 1979, and updated in 1988. This contribution describes the current status of the program, and the nature of the issues that the program was designed to address. The Seven Sisters Station's dam on the Winnipeg River, about 90 km northeast of the City of Winnipeg, was used as an example. Extensive reviews of flood risks and downstream inundation potential at Seven Sisters' revealed a number of deficiencies; these findings will be incorporated into a corporate plan of overall remediation. Updating the program will also include efforts to ensure adherence to national dam safety guidelines. 5 figs

  8. Surficial geologic map of the Red Rock Lakes area, southwest Montana

    Science.gov (United States)

    Pierce, Kenneth L.; Chesley-Preston, Tara L.; Sojda, Richard L.

    2014-01-01

    The Centennial Valley and Centennial Range continue to be formed by ongoing displacement on the Centennial fault. The dominant fault movement is downward, creating space in the valley for lakes and the deposition of sediment. The Centennial Valley originally drained to the northeast through a canyon now represented by a chain of lakes starting with Elk Lake. Subsequently, large landslides blocked and dammed the drainage, which created Lake Centennial, in the Centennial Valley. Sediments deposited in this late Pleistocene lake underlie much of the valley floor and rest on permeable sand and gravel deposited when the valley drained to the northeast. Cold Pleistocene climates enhanced colluvial supply of gravelly sediment to mountain streams and high peak flows carried gravelly sediment into the valley. There, the lower gradient of the streams resulted in deposition of alluvial fans peripheral to Lake Centennial as the lake lowered through time to the level of the two present lakes. Pleistocene glaciers formed in the high Centennial Range, built glacial moraines, and also supplied glacial outwash to the alluvial fans. Winds from the west and south blew sand to the northeast side of the valley building up high dunes. The central part of the map area is flat, sloping to the west by only 0.6 meters in 13 kilometers (2 feet in 8 miles) to form a watery lowland. This lowland contains Upper and Lower Red Rock Lakes, many ponds, and peat lands inside the “water plane,” above which are somewhat steeper slopes. The permeable sands and gravels beneath Lake Centennial sediments provide a path for groundwater recharged from the adjacent uplands. This groundwater leaks upward through Lake Centennial sediments and sustains wetland vegetation into late summer. Upper and Lower Red Rock Lakes are formed by alluvial-fan dams. Alluvial fans converge from both the south and the north to form outlet thresholds that dam the two shallow lakes upstream. The surficial geology aids in

  9. User's Guide: Arch Dam Stress Analysis System (ADSAS)

    National Research Council Canada - National Science Library

    1997-01-01

    .... ADSAS assumes linear elastic behavior for the entire dam, i.e. the dam is assumed to support the computed tensile stresses within the concrete mass and across the monolith joints without cracking or opening the joints...

  10. Inventory of Dams in the State of Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Permitted dams in Iowa and associated attributes, as recorded by the Floodplain Section of the DNR. The dams regulated are those with the parameters listed below: a....

  11. Computational Aspects of Dam Risk Analysis: Findings and Challenges

    Directory of Open Access Journals (Sweden)

    Ignacio Escuder-Bueno

    2016-09-01

    Full Text Available In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management. This paper summarizes the outcomes of three themes related to dam risk analysis discussed in the Benchmark Workshops organized by the International Commission on Large Dams Technical Committee on “Computational Aspects of Analysis and Design of Dams.” In the 2011 Benchmark Workshop, estimation of the probability of failure of a gravity dam for the sliding failure mode was discussed. Next, in 2013, the discussion focused on the computational challenges of the estimation of consequences in dam risk analysis. Finally, in 2015, the probability of sliding and overtopping in an embankment was analyzed. These Benchmark Workshops have allowed a complete review of numerical aspects for dam risk analysis, showing that risk analysis methods are a very useful tool to analyze the risk of dam systems, including downstream consequence assessments and the uncertainty of structural models.

  12. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Department of Resources — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  13. Dam-Break Flood Analysis Upper Hurricane Reservoir, Hartford, Vermont

    National Research Council Canada - National Science Library

    Acone, Scott

    1995-01-01

    .... Various dam break flood conditions were modeled and inundation maps developed. Based on this analysis the dam is rated a Class 2 or significant hazard category in terms of its potential to cause downstream damage...

  14. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Natural Resource Agency — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  15. Investigation on the Causes of Cracking in Earth Dams (Case study: Mahmood-Abad Earth Dam

    Directory of Open Access Journals (Sweden)

    H. Rahimi

    2016-09-01

    Full Text Available Introduction: Cracking of earth dams is a one of the main threat causes of stability of embankment dams. In this research by modeling of the behavior of an embankment dam and employing conditions of the earthquake, the reasons of cracking were inspected using by modeling of earth dam behavior. Based on the literature, one of the main causes of dam failures is sliding and cracking of the dam structure during earthquake. Localized liquefaction of foundation soils was one of the causes of the observed post-earthquake distress within these dams. Material and Methods: In order to study the causes and the results of crack on earth dams, Mahmoodabad earthen dam with a height of 19 m, is located in Zanjan province, northwest of Iran, which suffered a longitudinal crack on the crest and slight sliding of the upstream slope due to 2001 Avaj earthquake was studied. This dam has faced earthquake two times with an interval of two years. During the first earthquake with the magnitude about 6.6 in Richter scale small longitudinal cracks had created on the crest. The developed cracks had been repaired by injecting the cement and then has been hidden by passing the time. After the second earthquake with the magnitude about 6.5 in Richter scale the hidden cracks had been appeared again and the slight movement of the upper slopes of dam reported. Based on the site investigation and documented information about dam, including maps and parameter data, the behavior of the dam has modeled by using Plaxis as a finite element model. In order to check the accuracy of the design of dam, the stability analysis has been conducted using by Xslope as a limit equilibrium model. The foundation conditions and the Geotechnical properties of the layer beneath the dam has been inspected by open excavation. Results and Discussion: Underground investigation about Geotechnical properties of dam foundation has showed that there is a thin sandy layer confined in alluvium material of the

  16. Dams and transnational advocacy: Political opportunities in transnational collective action

    Science.gov (United States)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even

  17. Bathymetry of Lake Erie and Lake Saint Clair

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Bathymetry of Lake Erie and Lake Saint Clair has been compiled as a component of a NOAA project to rescue Great Lakes lake floor geological and geophysical data and...

  18. Integrated hazard assessment of Cirenmaco glacial lake in Zhangzangbo valley, Central Himalayas

    Science.gov (United States)

    Wang, Weicai; Gao, Yang; Iribarren Anacona, Pablo; Lei, Yanbin; Xiang, Yang; Zhang, Guoqing; Li, Shenghai; Lu, Anxin

    2018-04-01

    Glacial lake outburst floods (GLOFs) have recently become one of the primary natural hazards in the Himalayas. There is therefore an urgent need to assess GLOF hazards in the region. Cirenmaco, a moraine-dammed lake located in the upstream portion of Zhangzangbo valley, Central Himalayas, has received public attention after its damaging 1981 outburst flood. Here, by combining remote sensing methods, bathymetric survey and 2D hydraulic modeling, we assessed the hazard posed by Cirenmaco in its current status. Inter-annual variation of Cirenmaco lake area indicates a rapid lake expansion from 0.10 ± 0.08 km2 in 1988 to 0.39 ± 0.04 km2 in 2013. Bathymetric survey shows the maximum water depth of the lake in 2012 was 115 ± 2 m and the lake volume was calculated to be 1.8 × 107 m3. Field geomorphic analysis shows that Cirenmaco glacial lake is prone to GLOFs as mass movements and ice and snow avalanches can impact the lake and the melting of the dead ice in the moraine can lower the dam level. HEC-RAS 2D model was then used to simulate moraine dam failure of the Cirenmaco and assess GLOF impacts downstream. Reconstruction of Cirenmaco 1981 GLOF shows that HEC-RAS can produce reasonable flood extent and water depth, thus demonstrate its ability to effectively model complex GLOFs. GLOF modeling results presented can be used as a basis for the implementation of disaster prevention and mitigation measures. As a case study, this work shows how we can integrate different methods to GLOF hazard assessment.

  19. Potentially dangerous glacial lakes in Kyrgyzstan - Research overview of 2004-2015

    Science.gov (United States)

    Jansky, Bohumir; Yerokhin, Sergey; Sobr, Miroslav; Engel, Zbynek; Cerny, Michal; Falatkova, Kristyna; Kocum, Jan; Benes, Vojtech

    2016-04-01

    Global warming causes intensive melting and retreat of glaciers in most of high mountains all over the world. This process is also evident in the mountain regions of central Tien Shan. Glacier melt water affects changes in hydrological regime of water streams and causes overfilling of high mountain lake basins. The dams of many lakes are very unstable and can burst open. To determine the degree of such risk, it is necessary to analyse the genesis of lakes, to characterize the morphology of the lake basins and to know the particularities of their hydrological regime. According to the latest inventory within territory of Kyrgyzstan, a total of 1328 lakes have been identified as potentially dangerous, 12 lakes are considered as currently dangerous, other 25 feature high potential hazard. Since 1952 more than 70 disastrous cases of lake outburst have been registered. The hazardous alpine lakes are studied in Kyrgyzstan systematically since 1966. Since 2004, Czech-Kyrgyz research team has been operating in Kyrgyzstan in the field of dangerous glacial lakes. Projects were focused primarily on high-mountain glacial lakes risk assessment, propositions of risk mitigation measures, establishment of permanent research station near one of the studied glacier complexes, preparation of risk analysis for selected endangered valleys, evaluation of climatic and hydrological data and glacier development within observed regions. The most significant portion of data and information has been gathered during field work, complemented by satellite image analysis and surveillance flights over the monitored sites.

  20. Seismic performance assessment of latyan concrete buttress dam ...

    African Journals Online (AJOL)

    In order to design earthquake resistant dams and evaluate the safety of existing dams that will be exposed to future earthquakes, it is essential to have accurate and reliable analysis procedures to predict the stresses and deformations in dams subjected to earthquake ground motion. For a damwater- foundation system, the ...

  1. The Grand Ethiopian Renaissance Dam and Ethiopia's Succession ...

    African Journals Online (AJOL)

    Tadesse Kassa Woldetsadik

    2013-06-01

    Jun 1, 2013 ... Dam concessions engendered detrimental impacts on Ethiopia's riparian rights ... control works on the Aswan High and the Roseires dams. Disturbed by the ... hegemonic control that would inevitably ensue from construction of the Dam ...... Projects Implementation Division AAAID, Sudan, p.1. 39 Ibid.

  2. Tenaga Nasional Berhad dam safety and surveillance program

    International Nuclear Information System (INIS)

    Jansen Luis; Zulkhairi Abd Talib

    2006-01-01

    This paper discusses the current practice of dam surveillance, which includes dam monitoring which is a process of visual inspections, measuring, processing, compiling and analyzing dam instrumentation data to determine the performance of a dam. The prime objective of the dam surveillance system is to ensure that any occurrence and development of safety deficiencies and problems are quickly detected, identified, analyzed and the required remedial actions are determined and consequently carried out in due time. In brief, the section is responsible to ensure that the dam monitoring and surveillance works are implemented as per scheduled and in accordance with the requirement and guidelines prepared by the dam designers and in accordance with international commission on large dams, ICOLD. The paper also illustrates and recommends an alternative approach for dam surveillance program using risk management approach, which is currently being actively adopted by some countries like USA, Canada, Australia and etc, towards improving the dam safety management and the decision making process. The approach provides a wider area of opportunity, improvements and benefits particular in the evaluation and modifications to the dam performance and safety. The process provides an effective and efficient tool for the decision makers and engineers through a comprehensive evaluation and a good understanding of the hazards, risks and consequences in relation to dam safety investigations. (Author)

  3. How to manage the cumulative flood safety of catchment dams ...

    African Journals Online (AJOL)

    Dam safety is a significant issue being taken seriously worldwide. However, in Australia, although much attention is being devoted to the medium- to large-scale dams, minimal attention is being paid to the serious potential problems associated with smaller dams, particularly the potential cumulative safety threats they pose ...

  4. Factors influencing hysteresis characteristics of concrete dam deformation

    Directory of Open Access Journals (Sweden)

    Jia-he Zhang

    2017-04-01

    Full Text Available Thermal deformation of a concrete dam changes periodically, and its variation lags behind the air temperature variation. The lag, known as the hysteresis time, is generally attributed to the low velocity of heat conduction in concrete, but this explanation is not entirely sufficient. In this paper, analytical solutions of displacement hysteresis time for a cantilever beam and an arch ring are derived. The influence of different factors on the displacement hysteresis time was examined. A finite element model was used to verify the reliability of the theoretical analytical solutions. The following conclusions are reached: (1 the hysteresis time of the mean temperature is longer than that of the linearly distributed temperature difference; (2 the dam type has a large impact on the displacement hysteresis time, and the hysteresis time of the horizontal displacement of an arch dam is longer than that of a gravity dam; (3 the reservoir water temperature variation lags behind of the air temperature variation, which intensifies the differences in the horizontal displacement hysteresis time between the gravity dam and the arch dam; (4 with a decrease in elevation, the horizontal displacement hysteresis time of a gravity dam tends to increase, whereas the horizontal displacement hysteresis time of an arch dam is likely to increase initially, and then decrease; and (5 along the width of the dam, the horizontal displacement hysteresis time of a gravity dam decreases as a whole, while the horizontal displacement hysteresis time of an arch dam is shorter near the center and longer near dam surfaces.

  5. Earthquake induced liquefaction analysis of Tendaho earth-fill dam ...

    African Journals Online (AJOL)

    fill dam, which is part of Tendaho Dam and Irrigation Project; the largest irrigation project in Ethiopia to date. The dam is located in the most seismic part of Ethiopia and was originally designed to be founded on potentially liquefiable alluvium ...

  6. Major dams of the United States, Geographic NAD83, USGS (2006) [dams00x020_USGS_2006

    Data.gov (United States)

    Louisiana Geographic Information Center — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands. The map layer was created by extracting dams 50 feet or...

  7. Lake Urmia (Iran): can future socio-ecologically motivated river basin management restore lake water levels in an arid region with extensive agricultural development?

    Science.gov (United States)

    Fazel, Nasim; Berndtsson, Ronny; Bertacchi Uvo, Cintia; Klove, Bjorn; Madani, Kaveh

    2015-04-01

    Lake Urmia, one of the world's largest hyper saline lakes located in northwest of Iran, is a UNESCO Biosphere Reserve and Ramsar site, protected as a national park and, supports invaluable and unique biodiversity and related ecosystem services for the region's 6.5 million inhabitants. Due to increased development of the region's water resources for agriculture and industry and to a certain extent climate change, the lake has started to shrink dramatically since 1995 and now is holding less than 30 percent of its volume. Rapid development in agricultural sector and land-use changes has resulted in immense construction of dams and water diversions in almost all lake feeding rivers, intensifying lake shrinking, increasing salinity and degrading its ecosystem. Recently, lake's cultural and environmental importance and social pressure has raised concerns and brought government attention to the lake restoration plans. Along with poor management, low yield agriculture as the most water consuming activity in the region with, rapid, insufficient development is one of the most influential drivers in the lake desiccation. Part of the lake restoration plans in agricultural sector is to restrict the agricultural areas in the main feeding river basins flowing mostly in the southern part of the lake and decreasing the agricultural water use in this area. This study assess the efficiency and effectiveness of the proposed plans and its influence on the lake level rise and its impacts on economy in the region using a system dynamics model developed for the Lake consist of hydrological and agro-economical sub-systems. The effect of decrease in agricultural area in the region on GDP and region economy was evaluated and compared with released water contribution in lake level rise for a five year simulation period.

  8. Mitigation for the Construction and Operation of Libby Dam, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James L.; Marotz, Brian L.; DeShazer, Jay (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2003-06-01

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to ''protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries...'' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May, 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to

  9. Investigation of geophysical methods for assessing seepage and internal erosion in embankment dams : a study of through-dam seismic testing at WAC Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Gaffran, P.; Jeffries, M. [BC Hydro, Burnaby, BC (Canada)

    2005-07-15

    Crosshole tomography is used to establish the distribution of seismic velocity between drill holes. The through-dam mode takes advantage of the triangular cross-section of earth embankments, obviating the need for drill holes. Seismic energy, generated on one face of the dam, passes underneath the crest and is detected by sensors arrayed on the opposite face. The sinkholes discovered at WAC Bennett Dam in 1996 provided an opportunity to test the procedure. Using p-wave energy, two series of measurements were conducted, notably one immediately before remediation of one sinkhole, and a second one shortly after the sinkhole was repaired. The known defect was successfully imaged by the first round of measurements. This report presented the results of an investigation of the through-dam seismic method using propagation of seismic waves through a dam from upstream to downstream, or vice-versa. The purpose of the study was to determine if this procedure could characterize the distribution of seismic velocity within a dam in an accurate and cost effective manner. The report presented the methods of velocity testing such as crosshole and downhole, and tomography; and through-dam measurements. Background to the Bennett Dam studies was also provided, with particular reference to the Bennett Dam sinkholes; sinkhole investigations; working hypothesis for sinkhole development; sinkhole number one characterization; and sinkhole remediation. An analysis of compression wave testing at Bennett Dam and shear wave testing was then offered. Other topics that were discussed included field test procedures; methodologies for data processing; p-waves versus s-waves; applicability of the research; and costs of through-dam surveys. It was concluded that under the right circumstances, through-dam seismic testing was capable of detecting changed conditions in an embankment dam. 15 refs., 2 tabs., 41 figs., 1 appendix.

  10. An overview of the recent palaeolimnology of selected lakes in the Romanian Carpathians

    Directory of Open Access Journals (Sweden)

    Simon M. HUTCHINSON

    2011-06-01

    Full Text Available Lakesediments can act as sensitive monitors of environmental change and human impacts. The Romanian Carpathians hold a significant number of glacial lakes and transverse a region of considerable environmental concerns, but relatively sparse environmental data and little recent lake sediment based research. Findings from selected lakes in two of the highest sections of these mountains inRomaniaare presented. In addition the palaeolimnological record held in the surficial sediments of other lower elevations sites in theEastern Carpathiansis also discussed. These sites are situated in contrasting sites comprising a volcanic crater lake (Lacul Sfânta Ana,HarghitaMountains and a lake dammed by land sliding (Lacul Iezer-Feredeu, Obcina Feredeului. 

  11. Primary Productivity of the Cengklik Dam Boyolali

    Directory of Open Access Journals (Sweden)

    WIRYANTO

    2002-01-01

    Full Text Available Primary productivity dynamic of the water ecosystem was conducted faster in the last decades. This study was intended to find out the primary productivity of Cengklik dam Boyolali, Central Java to explain the ecosystem dynamic and to lead the maintenance of dam. This study used quantitative methods in completely randomized group design (CRD, and the data was analized by Analysis of Variance (ANAVA. Samples were taken horizontally in four sampling point, respectively in the riparian zone, around of the floating net (“karamba”, in the center of dam water and around of the ex-paddy fields. There were taken vertically in three-depth point in each of the sampling point, respectively 0.5 meter, 1.5 meter, and 2.5 meter. The results showed that the gross primary productivity of the dam was 11.122.500-22.545.600 mgC/m3/days, and the primary productivity differences in each of the point sampling caused by light intensity, nutrient supply, and abundance of the chlorophyll organisms.

  12. The blues of 'Petit Saut' dam

    International Nuclear Information System (INIS)

    Nougaret, M.P.

    1994-01-01

    Great works of equipping get some bad consequences. It is the case of the hydro-electric dam of 'Petit-Saut' in french Guyana. Even if it is a case of renewable energy some questions appear about the destruction among the fauna and the flora

  13. Dam water quality study. Report to Congress

    International Nuclear Information System (INIS)

    1989-05-01

    The objective of the report is to identify water quality effects attributable to the impoundment of water by dams as required by Section 524 of the Water Quality Act of 1987. The document presents a study of water quality effects associated with impoundments in the U.S.A

  14. Modelling approach for gravity dam break analysis

    Directory of Open Access Journals (Sweden)

    Boussekine Mourad

    2016-09-01

    Full Text Available The construction of dams in rivers can provide considerable benefits such as the supply of drinking and irrigation water; however the consequences which would result in the event of their failure could be catastrophic. They vary dramatically depending on the extent of the inundation area, the size of the population at risk.

  15. Assessment of changes at Glen Canyon Dam

    International Nuclear Information System (INIS)

    Cherry, D.; McCoy, J.; Crandall, S.

    1991-01-01

    This paper describes the complexity associated with the assessment of financial impacts of proposed and actual short-term restrictions at Glen Canyon Dam. The reasons for these restrictions are discussed as well as the methods used to measure their financial impact to Western Area Power Administration

  16. Dam tot damloop : economische en maatschappelijke waarde

    NARCIS (Netherlands)

    de Nooij, Michiel; Horsselenberg, Peter

    2014-01-01

    Ruim 36.757 lopers (op de hoofdafstand!) en 115.000 bezoekers langs het parcours van het centrum van Amsterdam naar het centrum van Zaanstad, maakt de Dam tot damloop een groot evenement (het grootste hardloop evenement van Nederland) met een flinke impact op de (lokale) samenleving en economie. Dit

  17. Physicochemical characteristics of undrainable water dams utilized ...

    African Journals Online (AJOL)

    pH, electro-conductivity and total dissoved solutes (TDS) were measured in-situ from three reservoirs (Gathathini, Lusoi and Kianda dams) differing in their habitat characteristics. Water samples were collected for determination of the ionic concentartions of the reservoirs. Water quality status differed markedly between sites, ...

  18. 75 FR 49429 - Metal and Nonmetal Dams

    Science.gov (United States)

    2010-08-13

    ... internal water pressures. Pressures beyond a certain level would lead to structural instability. In the 18... foundation and embankment material strengths, and stability analyses to verify that the slopes of the dam..., rationales, benefits to miners, technological and economic feasibility, impact on small mines, and supporting...

  19. Ecological regime shifts and changes of lake ecosystem service in a shallow Yangtze lake (Taibai Lake, China) over the past 150 years

    Science.gov (United States)

    Dong, X.; Xu, M.; Yang, X.

    2017-12-01

    Shallow lakes provide a range of ecosystem services such as water supply, biodiversity, aquaculture, tourism, shipping and flood regulation. Over recent decades, many lakes have become severely deteriorated due to a coupled natural and human disturbance. Given the limited monitoring records, however, we still have little knowledge on how, when and why those lake experienced ecological status shifts, and how the lake ecosystem service changed. Paleolimnological techniques were widely used in understanding the historical environmental and ecological changes. Here, we chose a typical eutrophic shallow lake, Taibai Lake, and acquired geochemistry proxies, grain size, diatom, cladocera and chironomid from a 210Pb and 137Cs dated sediment core. Document records and monitoring data are also included as important marks of social and environmental change. A T-test based algorithm of STARS reveal at least two ecological shifts, respectively in the 1960s and the 1990s. The sudden shift in the 1960s is supposed to be influenced by a dam and sluice construction in the 1950s and another shift in the 1990s should be a critical transition due to the alternation of ecosystem structure for higher fishery production. Correspondingly, lake ecosystem service (LES) also experienced significant changes. Prior to 1930s, different types of LES kept relatively stable with low values. With the dam construction in the 1960s, the changed hydrological condition led to gradual increases in both regulation and provision service. However, with much effort on fishery and reclamation, the regulation service of the lake decreased, exhibiting a tradeoff among LES. After 1990s, with intense aquaculture, most types of LSE suffered a further decrease. The long-term records exhibited that ecosystem services in primary productivity and biodiversity maintenance increased (synergies) whereas services in water-purification and climate regulating decreased significantly (tradeoffs) since 1950s, when local

  20. Expectations of immortality: dam safety management into the next millennium

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, M.D. [Tonkin and Taylor International Ltd., Auckland, (New Zealand)

    1999-07-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs.

  1. Dam risk reduction study for a number of large tailings dams in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Verma, N. [AMEC Earth and Environmental Ltd., Mississauga, ON (Canada); Small, A. [AMEC Earth and Environmental Ltd., Fredericton, NB (Canada); Martin, T. [AMEC Earth and Environmental, Burnaby, BC (Canada); Cacciotti, D. [AMEC Earth and Environmental Ltd., Sudbury, ON (Canada); Ross, T. [Vale Inco Ltd., Sudbury, ON (Canada)

    2009-07-01

    This paper discussed a risk reduction study conducted for 10 large tailings dams located at a central tailings facility in Ontario. Located near large industrial and urban developments, the tailings dams were built using an upstream method of construction that did not involve beach compaction or the provision of under-drainage. The study provided a historical background for the dam and presented results from investigations and instrumentation data. The methods used to develop the dam configurations were discussed, and remedial measures and risk assessment measures used on the dams were reviewed. The aim of the study was to address key sources of risk, which include the presence of high pore pressures and hydraulic gradients; the potential for liquefaction; slope instability; and the potential for overtopping. A borehole investigation was conducted and piezocone probes were used to obtain continuous data and determine soil and groundwater conditions. The study identified that the lower portion of the dam slopes were of concern. Erosion gullies could lead to larger scale failures, and elevated pore pressures could lead to the risk of seepage breakouts. It was concluded that remedial measures are now being conducted to ensure slope stability. 6 refs., 1 tab., 6 figs.

  2. Holocene evolution of the Tonle Sap Lake: valley network infill and rates of sedimentation in Cambodia's Great Lake

    Science.gov (United States)

    Best, J.; Darby, S. E.; Langdon, P. G.; Hackney, C. R.; Leyland, J.; Parsons, D. R.; Aalto, R. E.; Marti, M.

    2017-12-01

    Tonle Sap Lake, the largest freshwater lake in SE Asia (c. 120km long and 35 km wide), is a vital ecosystem that provides 40-60% of the protein for the population of Cambodia. The lake is fed by flow from the Mekong River that causes the lake rise in level by c. 8m during monsoonal and cyclone-related floods, with drainage of the lake following the monsoon. Hydropower dam construction on the Mekong River has raised concerns as to the fragility of the Tonle Sap habitat due to any changing water levels and sedimentation rates within the lake. This paper details results of sub-bottom profiling surveys of Tonle Sap Lake in October 2014 that detailed the stratigraphy of the lake and assessed rates of infill. An Innomar Parametric Echo Sounder (PES) was used to obtain c. 250 km of sub-bottom profiles, with penetration up to 15m below the lake bed at a vertical resolution of c. 0.20m. These PES profiles were linked to cores from the north of the lake and previous literature. The PES profiles reveal a network of valleys, likely LGM, with relief up to c. 15-20m, that have been infilled by a suite of Holocene sediments. The valley surface is picked out as a strong reflector throughout the lake, and displays a series of valleys that are up to c. 15m deep and commonly 50-200m wide, although some of the largest valleys are 1.2km in width. Modelling of channel network incision during LGM conditions generates landscapes consistent with our field observations. The Tonle Sap valley network is infilled by sediments that show firstly fluvial and/or subaerial slope sedimentation, and then by extensive, parallel-bedded, lacustrine sedimentation. Lastly, the top c. 1m of sedimentation is marked by a distinct basal erosional surface that can be traced over much of the Tonle Sap Lake, and that is overlain by a series of parallel PES reflections. This upper sediment layer is interpreted to represent sedimentation in the Tonle Sap lake due to sediment suspension settling but after a period

  3. Climate change induced salinisation of artificial lakes in the Netherlands and consequences for drinking water production.

    Science.gov (United States)

    Bonte, Matthijs; Zwolsman, John J G

    2010-08-01

    In this paper we present a modelling study to investigate the impacts of climate change on the chloride concentration and salinisation processes in two man-made freshwater lakes in the Netherlands, Lake IJsselmeer and Lake Markermeer. We used a transient compartmental chloride and water balance model to elucidate the salinisation processes occurring under present conditions and assess future salinisation under two climate forcing scenarios. The model results showed that the Rhine River is the dominant determinant for the chloride concentration in both lakes, followed by drainage of brackish groundwater from the surrounding polders. The results further show that especially during dry years, seawater intrusion through the tidal closure dam is an important source of chloride to Lake IJsselmeer. The results from the climatic forcing scenarios show that Lake IJsselmeer is especially vulnerable to climate-induced salinisation whereas effects on Lake Markermeer are relatively small. Peak chloride concentrations at the raw water intake of the Andijk drinking water facility on Lake IJsselmeer are projected to increase to values above 250 mg/l in the most far-reaching climate change scenario W+ in 2050 for dry years. This is well above the maximum allowable concentration of 150 mg/l for chloride in drinking water. Modelling showed that climate change impacts the chloride concentrations in a variety of ways: 1) an increasing occurrence of low river flows from summer to autumn reduces the dilution of the chloride that is emitted to the Rhine with a constant load thereby increasing its concentration; 2) increased open water evaporation and reduced rainfall during summer periods and droughts increases the chloride concentration in the water; and 3) rises in sea level increase seawater intrusion through the tidal closure dam of Lake IJsselmeer. The processes described here are likely to affect many other tidal rivers or lakes and should be considered when planning future raw

  4. Proceeding of the public safety around dams conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Canadian Dam Association hosted the Public Safety Around Dams workshop in which presentations were given in the morning to describe the different measures and methods implemented by the Ontario Ministry of Natural Resources, Ontario Power Generation and others to improve safety around dams. In the afternoon, the participants toured the Auburn and Lakefield dams and facilities to view the infrastructures and equipment. A roundtable discussion concluded the day. Following this workshop, a Public Safety Around Dams group was created on the social network site, LinkedIn. This conference featured 6 presentations, 3 of which have been catalogued separately for inclusion in this database.

  5. Use of mediation to resolve the dispute over low-head hydroelectric development at Swan Lake

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, D.

    1980-08-01

    In 1978, the Maine Hydroelectric Development Corporation announced that the company planned to renovate five dams on the Goose River near Belfast, Maine to generate electricity. The most important part of the plan involved the use of the first of the dams, at the lower end of Swan Lake, to regulate the flow of water to the downstream dams. For Maine Hydro, management of the Swan Lake dam could make an otherwise marginal proposal lucrative. However, Swan Lake is vitally important to the residents of Swanville. The town was so concerned about the impact of this proposed hydroelectric project that it petitioned the Federal Energy Regulatory Commission (FERC) to deny Maine Hydro's application on the grounds that it would damage the environment, reduce property values and eliminate recreational opportunities for its citizens. This report was written by the mediator of the dispute and represents the views and behavior of the parties as the mediator understood them. It is intended to present the mediator's observations in a way which will inform and assist others who may someday face a difficult situation like the one the Town of Swanville and Maine Hydroelectric Development Corporation faced, and successfully resolved, in the spring and summer of 1979.

  6. National Dam Safety Program. Newman Lake Dam (Inventory Number VA 66001), Potomac River Basin, Harrisonburg, Virginia. Phase I Inspection Report.

    Science.gov (United States)

    1980-07-01

    tlsq &W CPA VWTv * 0~ wfe 4 o-f’ffv 1401,1 etc, flm# 4bd u J>’ i te.’. fRt. -~~ab t~rviof of ~naGt ##d a dfDW. >*74otoo -o 42 -’J-’A le VI C...Inw+ A *c*I.PLA I. N ~ ,4E O. 8 ’DETAIL5 OF SPECIAL DE51GIJ 5PILLWsAY ATTACHED) TD INLET ENjD OF 5TANDARD DOUBJrLE 10g12* bOX C11LVERT ot- Ad#,. Z

  7. Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,

    2016-08-09

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed hydrologic and hydraulic analyses to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago El Guineo Dam. The Lago El Guineo Dam is within the headwaters of the Río Grande de Manatí and impounds a drainage area of about 4.25 square kilometers.The hydrologic assessment was designed to determine the outflow hydrographs and peak discharges for Lago El Guineo and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation event, (2) a 24-hour probable maximum precipitation event, and (3) a 24-hour, 100-year recurrence rainfall event. The hydraulic study simulated a dam failure of Lago El Guineo Dam using flood hydrographs generated from the hydrologic study. The simulated dam failure generated a hydrograph that was routed downstream from Lago El Guineo Dam through the lower reaches of the Río Toro Negro and the Río Grande de Manatí to determine water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” conditions. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC–HMS) and Hydrologic Engineering Center’s River Analysis System (HEC–RAS) computer programs, developed by the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was completed using the unsteady flow module available in the HEC–RAS model.Above the Lago El Guineo Dam, the simulated inflow peak discharges from HEC–HMS resulted in about 550 and 414 cubic meters per second for the 6- and 24-hour probable maximum precipitation events, respectively. The 24-hour, 100-year recurrence storm simulation resulted in a peak discharge of about 216 cubic meters per second. For the hydrologic analysis, no dam failure conditions are

  8. Seismic failure modes and seismic safety of Hardfill dam

    Directory of Open Access Journals (Sweden)

    Kun Xiong

    2013-04-01

    Full Text Available Based on microscopic damage theory and the finite element method, and using the Weibull distribution to characterize the random distribution of the mechanical properties of materials, the seismic response of a typical Hardfill dam was analyzed through numerical simulation during the earthquakes with intensities of 8 degrees and even greater. The seismic failure modes and failure mechanism of the dam were explored as well. Numerical results show that the Hardfill dam remains at a low stress level and undamaged or slightly damaged during an earthquake with an intensity of 8 degrees. During overload earthquakes, tensile cracks occur at the dam surfaces and extend to inside the dam body, and the upstream dam body experiences more serious damage than the downstream dam body. Therefore, under the seismic conditions, the failure pattern of the Hardfill dam is the tensile fracture of the upstream regions and the dam toe. Compared with traditional gravity dams, Hardfill dams have better seismic performance and greater seismic safety.

  9. Lake or Pond WBID

    Data.gov (United States)

    Vermont Center for Geographic Information — The VT DEC (Vermont Department of Environmental Conservation) manages an inventory of lake and pond information. The "Lakes and Ponds Inventory" stores the Water...

  10. National Lakes Assessment Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — The National Lakes Assessment (NLA) is a first-ever statistically-valid survey of the biological condition of lakes and reservoirs throughout the U.S. The U.S....

  11. DNR 24K Lakes

    Data.gov (United States)

    Minnesota Department of Natural Resources — Medium scale lake polygons derived from the National Wetlands Inventory (NWI) polygons and MnDOT Basemap lake delineations. Integrated with the DNR 24K Streams...

  12. Measurement of Hydrologic Streamflow Metrics and Estimation of Streamflow with Lumped Parameter Models in a Managed Lake System, Sebago Lake, Maine

    Science.gov (United States)

    Reeve, A. S.; Martin, D.; Smith, S. M.

    2013-12-01

    Surface waters within the Sebago Lake watershed (southern Maine, USA) provide a variety of economically and intrinsically valuable recreational, commercial and environmental services. Different stakeholder groups for the 118 km2 Sebago Lake and surrounding watershed advocate for different lake and watershed management strategies, focusing on the operation of a dam at the outflow from Sebago Lake. While lake level in Sebago Lake has been monitored for over a century, limited data is available on the hydrologic processes that drive lake level and therefore impact how dam operation (and other changes to the region) will influence the hydroperiod of the lake. To fill this information gap several tasks were undertaken including: 1) deploying data logging pressure transducers to continuously monitor stream stage in nine tributaries, 2) measuring stream discharge at these sites to create rating curves for the nine tributaries, and using the resulting continuous discharge records to 3) calibrate lumped parameter computer models based on the GR4J model, modified to include a degree-day snowmelt routine. These lumped parameter models have been integrated with a simple lake water-balance model to estimate lake level and its response to different scenarios including dam management strategies. To date, about three years of stream stage data have been used to estimate stream discharge in all monitored tributaries (data collection is ongoing). Baseflow separation indices (BFI) for 2010 and 2011 using the USGS software PART and the Eckhart digital filter in WHAT range from 0.80-0.86 in the Crooked River and Richmill Outlet,followed by Northwest (0.75) and Muddy (0.53-0.56) Rivers, with the lowest BFI measured in Sticky River (0.41-0.56). The BFI values indicate most streams have significant groundwater (or other storage) inputs. The lumped parameter watershed model has been calibrated for four streams (Nash-Sutcliffe = 0.4 to 0.9), with the other major tributaries containing

  13. Review of revised Klamath River Total Maximum Daily Load models from Link River Dam to Keno Dam, Oregon

    Science.gov (United States)

    Rounds, Stewart A.; Sullivan, Annett B.

    2013-01-01

    Flow and water-quality models are being used to support the development of Total Maximum Daily Load (TMDL) plans for the Klamath River downstream of Upper Klamath Lake (UKL) in south-central Oregon. For riverine reaches, the RMA-2 and RMA-11 models were used, whereas the CE-QUAL-W2 model was used to simulate pooled reaches. The U.S. Geological Survey (USGS) was asked to review the most upstream of these models, from Link River Dam at the outlet of UKL downstream through the first pooled reach of the Klamath River from Lake Ewauna to Keno Dam. Previous versions of these models were reviewed in 2009 by USGS. Since that time, important revisions were made to correct several problems and address other issues. This review documents an assessment of the revised models, with emphasis on the model revisions and any remaining issues. The primary focus of this review is the 19.7-mile Lake Ewauna to Keno Dam reach of the Klamath River that was simulated with the CE-QUAL-W2 model. Water spends far more time in the Lake Ewauna to Keno Dam reach than in the 1-mile Link River reach that connects UKL to the Klamath River, and most of the critical reactions affecting water quality upstream of Keno Dam occur in that pooled reach. This model review includes assessments of years 2000 and 2002 current conditions scenarios, which were used to calibrate the model, as well as a natural conditions scenario that was used as the reference condition for the TMDL and was based on the 2000 flow conditions. The natural conditions scenario included the removal of Keno Dam, restoration of the Keno reef (a shallow spot that was removed when the dam was built), removal of all point-source inputs, and derivation of upstream boundary water-quality inputs from a previously developed UKL TMDL model. This review examined the details of the models, including model algorithms, parameter values, and boundary conditions; the review did not assess the draft Klamath River TMDL or the TMDL allocations

  14. Assessment of Hydrologic Alterations Caused by the Three Gorges Dam in the Middle and Lower Reaches of Yangtze River, China

    Directory of Open Access Journals (Sweden)

    Liuzhi Jiang

    2014-05-01

    Full Text Available Hydrologic regime plays a major role in structuring biotic diversity within river ecosystems by controlling key habitat conditions within the river channel and floodplain. Daily flow records from seven hydrological stations and the range of variability approach were utilized to investigate the variability and spatial pattern of the hydrologic alterations induced by the construction of the Three Gorges Dam (TGD in the middle and lower reaches of the Yangtze River, China. Results show that the impoundment of the TGD disturbed the hydrologic regime downstream and directly affected the streamflow variations. The rate of changes and the annual extreme conditions were more affected by the TGD, particularly the low-flow relevant parameters. The alterations in the hydrologic regime were mainly caused by the TGD storing water during early autumn and releasing water during winter and spring. The effects on spatial patterns decreased as the distance from the dam increased, which was mainly attributed to the inflows from large tributaries along the Yangtze River as well as the interaction with the two largest natural lakes (i.e., Dongting Lake and Poyang Lake. These hydrologic alterations not only break the natural balance of eco-flow regimes but also result in undesirable ecological effects, particularly in terms of habitat availability for the fish community.

  15. 882 lakes of the Cordillera Blanca: An inventory, classification, evolution and assessment of susceptibility to outburst floods

    Czech Academy of Sciences Publication Activity Database

    Emmer, Adam; Klimeš, Jan; Mergili, M.; Vilímek, V.; Cochachin, A.

    2016-01-01

    Roč. 147, DEC (2016), s. 269-279 ISSN 0341-8162 R&D Projects: GA MŠk(CZ) LO1415 Institutional support: RVO:67985891 ; RVO:67179843 Keywords : high mountain lakes * GLOFs * environmental change * natural dams * Huascarán NP Subject RIV: DE - Earth Magnetism, Geodesy, Geography Impact factor: 3.191, year: 2016

  16. GIS inundation mapping and dam breach analysis of Woolwich Dam using HEC-geoRAS

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada); Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-07-01

    A study was conducted to determine the extent of flood inundation given a hypothetical dam breach scenario of the Woolwich Dam located in the Grand River Watershed, 2.5 km north of the Town of Elmira, Ontario. The dam is operated by the Grand River Conservation Authority and was constructed to provide low-flow augmentation to Canagagigue Creek. Advances in the computational capabilities of numerical models along with the availability of fine resolution geospatial data has lead to significant advances in the evaluation of catastrophic consequences due to the ensuing flood waters when dams fail. The hydraulic models HEC-RAS and HEC-GeoRAS were used in this study along with GIS to produce high resolution spatial and temporal flood inundation mapping. Given the proximity to the Town of Elmira, the dam is classified as having a high hazard potential. The large size and high hazard potential of the dam suggests that the Inflow Design Flood (IDF) is the Probable Maximum Flood (PMF) event. The outlet structure of the spillway consists of 4 ogee-type concrete spillways equipped with radial gates. A low-level concrete pipe located within the spillway structure provides spillage for maintenance purposes. The full flow capacity of the spillway structure is 297 cubic metres per second at the full supply level of 364.8 metres. In addition to GIS flood inundation maps, this paper included the results of flood hydrographs, water surface profiles and peak flow data. It was concluded that techniques used in this analysis should be considered for use in the development of emergency management planning and dam safety assessments across Canada. 6 refs., 3 tabs., 4 figs.

  17. Estimating reach-specific fish movement probabilities in rivers with a Bayesian state-space model: application to sea lamprey passage and capture at dams

    Science.gov (United States)

    Holbrook, Christopher M.; Johnson, Nicholas S.; Steibel, Juan P.; Twohey, Michael B.; Binder, Thomas R.; Krueger, Charles C.; Jones, Michael L.

    2014-01-01

    Improved methods are needed to evaluate barriers and traps for control and assessment of invasive sea lamprey (Petromyzon marinus) in the Great Lakes. A Bayesian state-space model provided reach-specific probabilities of movement, including trap capture and dam passage, for 148 acoustic tagged invasive sea lamprey in the lower Cheboygan River, Michigan, a tributary to Lake Huron. Reach-specific movement probabilities were combined to obtain estimates of spatial distribution and abundance needed to evaluate a barrier and trap complex for sea lamprey control and assessment. Of an estimated 21 828 – 29 300 adult sea lampreys in the river, 0%–2%, or 0–514 untagged lampreys, could have passed upstream of the dam, and 46%–61% were caught in the trap. Although no tagged lampreys passed above the dam (0/148), our sample size was not sufficient to consider the lock and dam a complete barrier to sea lamprey. Results also showed that existing traps are in good locations because 83%–96% of the population was vulnerable to existing traps. However, only 52%–69% of lampreys vulnerable to traps were caught, suggesting that traps can be improved. The approach used in this study was a novel use of Bayesian state-space models that may have broader applications, including evaluation of barriers for other invasive species (e.g., Asian carp (Hypophthalmichthys spp.)) and fish passage structures for other diadromous fishes.

  18. HYDROLOGIC MODELLING OF KATSINA-ALA RIVER BASIN: AN EMERGING SCENARIO FROM LAKE NYOS THREAT

    Directory of Open Access Journals (Sweden)

    J. O. Akinyede

    2012-07-01

    Full Text Available Understanding the hydrologic system surrounding crater lakes is of great importance for prevention of flooding damages, conservation of ecological environment, and assessment of socio-economic impact of dam failure on the civilians in the downstream regions. Lake Nyos is a crater lake formed by volcanic activities at the Oku volcanic field on the Cameroon Volcanic Line. It is a freshwater lake with a maximum depth of 200 meter. In 1986, a limnic eruption at the lake emitted 1.6 million tonnes of carbon dioxide from the bottom of saturated water into the air and suffocated up to 1,800 people and 3,500 livestock at nearby villages. The lake waters are held in place by a natural dam composed of loosely consolidated volcanic rock, which is now at the verge of collapse due to accelerated erosion. This study was carried out to determine the flood risks and vulnerability of population and infrastructure along Katsina-Ala drainage basins. The project integrated both satellite images and field datasets into a hydrologic model for Katsina-Ala River Basin and its vicinity including the Lake Nyos. ArcHydro was used to construct a hydrologic database as 'data models' and MIKE SHE was employed to conduct hydrologic simulations. Vulnerable infrastructures, population and socio-economic activities were identified to assist the Federal and State governments in disaster mitigation and management plans. The result of the project provides comprehensive knowledge of hydrologic system of Katsina-Ala drainage basin to mitigate potential future disasters from a potential dam failure and manage water resources against such disasters.

  19. Effect of a dam on epilithic algal communities of a mountain stream: before-after dam construction comparison

    Directory of Open Access Journals (Sweden)

    Luciana Cibils Martina

    2013-02-01

    Full Text Available In this study we evaluated the effect of a dam on epilithic algal communities by analyzing community response after dam construction and by comparing community composition, structure and biomass upstream and downstream of the dam. Samples of epilithic algae and environmental data were collected at each site during high and low water periods before and after dam construction in Achiras Stream (Córdoba, Argentina. Ordinations showed modifications in algal assemblages after dam construction and downstream of the dam. Ordinations also suggested a loss of seasonality at the downstream site since the assemblages were similar between hydrological periods after dam construction. Indicator species, obtained by the Indicator Value method, showed that, after dam construction, there could have been an increase in nutrient concentration and a release of plankton from the impoundment. Abundance, richness and diversity were altered after dam construction as assessed by ANOVAs derived from a modified BACI Design. Proportion of early-successional species was higher at the upstream site while late-successional species were dominant at the downstream site, as predicted. Lower fluctuations in discharge downstream of the dam may have helped succession advance, whereas at the upstream site, mainly during the high water period, floods could have caused sloughing of life forms from the outer layers of the biofilm, resetting the algal community to early successional stages. It may be concluded that the dam affected algal community and favored succession advance mainly by reducing current velocity and flow fluctuations.

  20. Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure

    Science.gov (United States)

    Peng, M.; Zhang, L. M.

    2013-02-01

    Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM) to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR). The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  1. Characterization of the geochemical processes present in the radionuclides and metals mobilization in the tailing dam at the Uranium Mining and Milling Facilities - Pocos de Caldas, MG, Brazil

    International Nuclear Information System (INIS)

    Pinto, Patricia Freitas

    1995-08-01

    In Brazil, the first step of nuclear fuel cycle - the mining and milling of the uranium ore - is developed at the Uranium Mining and Milling Facilities of Pocos de Caldas, Minas Gerais state. The wastes management is a very important aspect of the process. The understanding of the geochemical processes that occur in the tailings dam is a key question to define a plan of action concerning the decommissioning strategy of the facility. The objective of the present work was to give some issues to help in the adoption of the remedial actions concerning the decommissioning of the facility. It focused on the characterization of the most important geochemical processes regulating the mobilization of radionuclides and heavy metals in the tailings dam. Two cores from the tailings dam (uncovered area) were collected. Seepage and drainage waters were sampled, the same being true for the tailings dam lake. Groundwater form an aquifer bellow the tailings dam and superficial waters from a river that receives the effluents of the dam (Soberbo River) were also sampled. Data from the mining company were used to calculate the inventory of radionuclides and heavy metals deposited in the waste dam.The obtained results showed that pyrite oxidation is the key process in the mobilization of radionuclides and heavy metals from the wastes. Pyrite oxidation is a process regulated by oxygen diffusion and water. In the studied scenario it could be shown that the process was limited to a one meter deep layer in the uncovered part of the waste dam. Because of this, Fe, Al, Mn, Zn, Th and 238 U showed higher concentrations in the bottom layers of the cores in relation to the upper ones. 226 Ra and 210 Pb showed opposite patterns. The coprecipitation with Ca SO 4 was the most relevant mechanism in both radionuclides immobilization in the wastes. Sulfate was the only chemical species that could be assigned as a contaminant in aquifer bellow the waste dam. As a conclusion, the target environmental

  2. Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

    Science.gov (United States)

    Shivers, Molly J.; Smith, S. Jerrod; Grout, Trevor S.; Lewis, Jason M.

    2015-01-01

    Dams provide beneficial functions such as flood control, recreation, and storage of water supplies, but they also entail risk; dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or improper operation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning an emergency response if a dam breach occurs.

  3. Development of Turbulent Diffusion Transfer Algorithms to Estimate Lake Tahoe Water Budget

    Science.gov (United States)

    Sahoo, G. B.; Schladow, S. G.; Reuter, J. E.

    2012-12-01

    The evaporative loss is a dominant component in the Lake Tahoe hydrologic budget because watershed area (813km2) is very small compared to the lake surface area (501 km2). The 5.5 m high dam built at the lake's only outlet, the Truckee River at Tahoe City can increase the lake's capacity by approximately 0.9185 km3. The lake serves as a flood protection for downstream areas and source of water supply for downstream cities, irrigation, hydropower, and instream environmental requirements. When the lake water level falls below the natural rim, cessation of flows from the lake cause problems for water supply, irrigation, and fishing. Therefore, it is important to develop algorithms to correctly estimate the lake hydrologic budget. We developed a turbulent diffusion transfer model and coupled to the dynamic lake model (DLM-WQ). We generated the stream flows and pollutants loadings of the streams using the US Environmental Protection Agency (USEPA) supported watershed model, Loading Simulation Program in C++ (LSPC). The bulk transfer coefficients were calibrated using correlation coefficient (R2) as the objective function. Sensitivity analysis was conducted for the meteorological inputs and model parameters. The DLM-WQ estimated lake water level and water temperatures were in agreement to those of measured records with R2 equal to 0.96 and 0.99, respectively for the period 1994 to 2008. The estimated average evaporation from the lake, stream inflow, precipitation over the lake, groundwater fluxes, and outflow from the lake during 1994 to 2008 were found to be 32.0%, 25.0%, 19.0%, 0.3%, and 11.7%, respectively.

  4. Innovative reregulation weirs for dam releases

    International Nuclear Information System (INIS)

    Hauser, G.E.; Shane, R.M.; Niznik, J.A.; Brock, W.G.

    1991-01-01

    In this paper two different reregulation weir designs for dam release improvement are discussed. A porous timber crib is favored for applications where increased minimum flow is needed, and a labyrinth with vertical walls is favored where both minimum flow and aeration are needed. Weirs constructed below hydropower dams can improve minimum flows between generating periods and increase tailwater dissolved oxygen (DO) content during generation. TVA has developed two distinct functional designs: a timber crib weir for minimum flow and a labyrinth weir for minimum flow and aeration. A target minimum flow is sustained by slow drainage of the weir pool between periodic refills. With the labyrinth weir, aeration occurs during generation via overtopping. Both weirs are designed to maximize the value of the tailwater while minimizing backwater on the upstream turbine, unsafe hydraulic conditions, and environmental disturbance

  5. Determination of geostatistically representative sampling locations in Porsuk Dam Reservoir (Turkey)

    Science.gov (United States)

    Aksoy, A.; Yenilmez, F.; Duzgun, S.

    2013-12-01

    Several factors such as wind action, bathymetry and shape of a lake/reservoir, inflows, outflows, point and diffuse pollution sources result in spatial and temporal variations in water quality of lakes and reservoirs. The guides by the United Nations Environment Programme and the World Health Organization to design and implement water quality monitoring programs suggest that even a single monitoring station near the center or at the deepest part of a lake will be sufficient to observe long-term trends if there is good horizontal mixing. In stratified water bodies, several samples can be required. According to the guide of sampling and analysis under the Turkish Water Pollution Control Regulation, a minimum of five sampling locations should be employed to characterize the water quality in a reservoir or a lake. The European Union Water Framework Directive (2000/60/EC) states to select a sufficient number of monitoring sites to assess the magnitude and impact of point and diffuse sources and hydromorphological pressures in designing a monitoring program. Although existing regulations and guidelines include frameworks for the determination of sampling locations in surface waters, most of them do not specify a procedure in establishment of monitoring aims with representative sampling locations in lakes and reservoirs. In this study, geostatistical tools are used to determine the representative sampling locations in the Porsuk Dam Reservoir (PDR). Kernel density estimation and kriging were used in combination to select the representative sampling locations. Dissolved oxygen and specific conductivity were measured at 81 points. Sixteen of them were used for validation. In selection of the representative sampling locations, care was given to keep similar spatial structure in distributions of measured parameters. A procedure was proposed for that purpose. Results indicated that spatial structure was lost under 30 sampling points. This was as a result of varying water

  6. Perencanaan Check Dam Sungai Dawe Kudus

    OpenAIRE

    Mustaanah, Adibatul; Pinandoyo, Nur; Sugiyanto, Sugiyanto; Wahyuni, Sri Eko

    2013-01-01

    Juana river's located in two administrative regions Kudus and Pati had superficial. This is because the slope of the river is quite gentle and the level of environmental degradation in the watershed (DAS) Juana river's have increased. Based on these conditions, it is necessary to plan the construction of sediment control (check dams) to reduce sedimentation along the river and optimize the function of the Juana river's. Planning is performed on Dawe river's ,the branch of Juana river's. From ...

  7. Excavation of the Surikamigawa dam diversion tunnel. Surikamigawa dam karihaisui tunnel kantsu

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, T.; Konno, T. (Ministry of Construction, Tokyo (Japan))

    1994-04-01

    A bypass tunnel construction has been completed at the Surikamigawa dam (Japan). This paper describes the summary of the construction. The full-swing dam construction work is scheduled to begin in 1995. The soils distributed near the dam site consist of lapillus tuff containing andesite-based light stones and tuff-based conglomerates containing large gravels. Excavation of the dam diversion tunnel has used a blasting method, and the tunnel construction has adopted an automatic tunnel cross section marking system and a non-electric explosion method. This marking system is a system to irradiate a laser beam onto the facing to depict excavation lines that realizes labor saving and high-accuracy excavation. The error at the tunnel completion was found 20 mm. The non-electric explosion method ignites a coated explosive layer with an impact wave, which is electrostatically safe, and reduces blasting vibration. Electric detonators have also been used because of using ANFO explosives. The result obtained from measurements of inner space displacement necessary for the blasting process has indicated that the area near the dam site consists of stable mountains. 6 figs., 4 tabs.

  8. Three Sisters Dam: Investigations and monitoring

    International Nuclear Information System (INIS)

    Slopek, R.J.; Courage, L.J.R.; Keys, R.A.

    1990-01-01

    The geotechnical investigations, monitoring and interpretation of data associated with the evaluation of the Three Sisters Dam, which has been suffering from excessive seepage and is in need of enhancement, are outlined. The Three Sisters Dam is located in the continental ranges of the Rocky Mountains in Alberta, impounding the Spray Reservoir, and is founded on 60 m of interbedded sand, gravel, silt and clay layers. The computer code PC-SEEP was used to evaluate seepage. Details are provided of drilling, ground-penetrating radar surveys, seismic surveys, penstock inspection, sinkhole activity, piezometer monitoring, silt wells, settlement monuments, and tailrace monitoring. The intensive investigations of the foundations showed that they consist of a complex formation of interfingered stratified layers and leases of talus and glaciofluvial deposits. Due to the depth and nature of these materials drill hole penetration was limited to the use of the Becker hammer. This equipment successfully delineated the major soil horizons of the foundation. The continued information attained from inspection, drilling, testing, radar surveys, seismic work, monitoring of piezometers, leakage, silt wells and settlement monuments indicated that there are no large voids within the foundation of the dam. 2 refs., 12 figs

  9. Dam spills and fishes; Eclusees et poissons

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.).

  10. Sediment Transport Over Run-of-River Dams

    Science.gov (United States)

    O'Brien, M.; Magilligan, F. J.; Renshaw, C. E.

    2016-12-01

    Dams have numerous documented effects that can degrade river habitat downstream. One significant effect of large dams is their ability to trap sediment delivered from upstream. This trapping can alter sediment transport and grain size downstream - effects that often motivate dam removal decisions. However, recent indirect observations and modeling studies indicate that small, run-of-river (ROR) dams, which do not impede discharge, may actually leak sediment downstream. However, there are no direct measurements of sediment flux over ROR dams. This study investigates flow and sediment transport over four to six different New England ROR dams over a summer-fall field season. Sediment flux was measured using turbidity meters and tracer (RFID) cobbles. Sediment transport was also monitored through an undammed control site and through a river where two ROR dams were recently removed. These data were used to predict the conditions that contribute to sediment transport and trapping. Year 1 data show that tracer rocks of up to 61 mm were transported over a 3 m ROR dam in peak flows of 84% of bankfull stage. These tracer rocks were transported over and 10 m beyond the dam and continue to move downstream. During the same event, comparable suspended sediment fluxes of up to 81 g/s were recorded both upstream and downstream of the dam at near-synchronous timestamps. These results demonstrate the potential for sediment transport through dammed rivers, even in discharge events that do not exceed bankfull. This research elucidates the effects of ROR dams and the controls on sediment transport and trapping, contributions that may aid in dam management decisions.

  11. Langbjorn dam : adaptation for safe discharge of extreme floods

    Energy Technology Data Exchange (ETDEWEB)

    Yang, J. [Vattenfall Research and Development, Alvkarleby (Sweden); Ericsson, H.; Gustafsson, A. [SWECO, Stockholm (Sweden); Stenmark, M. [Vattenfall Power Consultant, Ludvika (Sweden); Mikaelsson, J. [Vattenfall Nordic Generation, Bispgarden (Sweden)

    2007-07-01

    The Langbjorn hydropower scheme, composed of an embankment dam with an impervious core of compacted moraine, a spillway section and a powerhouse, is located on the Angermanalven River in north Sweden. The scheme was commissioned in 1959 and is owned by Vattenfall. As part of its dam safety program, Vattenfall plans to adapt and refurbish many of its dams to the updated design-flood and dam-safety guidelines. Langbjorn is classified as a high hazard dam, as its updated design flood is 30 per cent higher than the existing spillway capacity. Safety evaluations were conducted for the Langbjorn dam, and, as required by the higher safety standard, there was a need to rebuild the dam, so that the design flood could be safely released without causing failure of the dam. This paper provided information on the Langbjorn hydropower scheme and discussed the planned rebuilding measures. For example, the design flood was accommodated by allowing a temporary raise of the water level by 1.3 metres above the legal retention reservoir level, which required heightening and reinforcement of the dam. Specifically, the paper discussed measures to increase the discharge capacity; handling and control of floating debris; improvement and heightening of impervious core in left and right connecting dam and abutment; measures to increase the stability of the left steep riverbank; and measures to increase stability of the spillway monoliths and the left guide wall. In addition, the paper discussed measures to ensure stability of the downstream stretch of the river bank and increase instrumentation. The paper also presented the results of hydraulic investigations to investigate the risk of erosion downstream of the dam. It was concluded that the dam could discharge the design flood and that the stability of the dam was improved and judged to be satisfactory during all foreseeable conditions. 2 refs., 8 figs.

  12. Thin, Conductive Permafrost Surrounding Lake Fryxell Indicates Salts From Past Lakes, McMurdo Dry Valleys, Antarctica

    Science.gov (United States)

    Foley, N.; Tulaczyk, S. M.; Gooseff, M. N.; Myers, K. F.; Doran, P. T.; Auken, E.; Dugan, H. A.; Mikucki, J.; Virginia, R. A.

    2017-12-01

    In the McMurdo Dry Valleys (MDV), permafrost should be thick and liquid water rare. However, despite the well below zero mean annual temperature in this cryospheric desert, liquid water can be found in lakes, summer melt streams, subglacial outflow, and - recent work has shown - underneath anomalously thin permafrost. In part, this niche hydrosphere is maintained by the presence of salts, which depress the freezing point of water to perhaps as cold as -10° Celsius. We detected widespread salty water across the MDV in lakes and at depth using a helicopter-borne Time Domain Electromagnetic (TDEM) sensor. By using the presence of brines to mark the transition from frozen permafrost (near the surface) to unfrozen ground (at depth), we have created a map of permafrost thickness in Lower Taylor Valley (LTV), a large MDV with a complex history of glaciation and occupation by lakes. Our results show that permafrost is thinner ( 200m) than would be expected based on geothermal gradient measurements (up to 1000m), a result of the freezing point depression caused by salt and potentially enhanced by an unfinished transient freezing process. Near Lake Fryxell, a large, brackish lake in the center of LTV, permafrost is very thin (about 30-40m) and notably more electrically conductive than more distal permafrost. This thin ring of conductive permafrost surrounding the lake basin most likely reflects the high presence of salts in the subsurface, preventing complete freezing. These salts may be a remnant of the salty bottom waters of a historic larger lake (LGM glacially dammed Lake Washburn) or the remnant of salty basal water from a past advance of Taylor Glacier, which now sits many km up-valley but is known to contain brines which currently flow onto the surface and directly into the subsurface aquifer.

  13. Downstream environmental impacts of dams: case study Tucurui Hydroelectric Plant, PA; Impactos ambientais a jusante de hidreletricas: o caso da usina de Tucurui, PA

    Energy Technology Data Exchange (ETDEWEB)

    Manyari, Waleska Valenca

    2007-12-15

    The hydroelectric resources of the Amazon region are considered a competitive alternative despite the structural problems they entail. Concerning the latter, plans to build large-scale dams in the region have drawn criticism mainly on account of the loss of forest cover in areas flooded by dam reservoirs and the conflicts concerning the relocation of indigenous and riverside communities in the region. This study seeks to contribute to better understanding of the environmental issue in the Amazon by focusing attention on the downstream effects of dams, which have large-scale, hitherto neglected ecological repercussions. The impact of dams extends well beyond the area surrounding the artificial lakes they create, harming rich Amazon wetland ecosystems. The morphology of dammed rivers changes in response to new inputs of energy and matter, which may in turn destroy certain biotypes. This is a remote-sensing-based case study of the Tucurui hydroelectric scheme in the Amazon state of Para. Attention is drawn to the need to take into account effects on alluvial rivers downstream from hydroelectric power plants when it comes to making planning decisions, as part of a sustainable energy policy. (author)

  14. Automatic dam concrete placing system; Dam concrete dasetsu sagyo no jidoka system

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, Y; Hori, Y; Nakayama, T; Yoshihara, K; Hironaka, T [Okumura Corp., Osaka (Japan)

    1994-11-15

    An automatic concrete placing system was developed for concrete dam construction. This system consists of the following five subsystems: a wireless data transmission system, an automatic dam concrete mixing system, a consistency determination system, an automatic dam concrete loading and transporting system, and a remote concrete bucket opening and closing system. The system includes the following features: mixing amount by mixing ratio and mixing intervals can be instructed from a concrete placing site by using a wireless handy terminal; concrete is mixed automatically in a batcher plant; a transfer car is started, and concrete is charged into a bucket automatically; the mixed concrete is determined of its properties automatically; labor cost can be reduced, the work efficiency improved, and the safety enhanced; and the system introduction has resulted in unattended operation from the aggregate draw-out to a bunker line, manpower saving of five persons, and reduction in cycle time by 10%. 11 figs., 2 tabs.

  15. Dam failure analysis/calibration using NWS models on dam failure in Alton, New Hampshire

    International Nuclear Information System (INIS)

    Capone, E.J.

    1998-01-01

    The State of New Hampshire Water Resources Board, the United States Geological Service, and private concerns have compiled data on the cause of a catastrophic failure of the Bergeron Dam in Alton, New Hampshire in March of 1996. Data collected related to the cause of the breach, the breach parameters, the soil characteristics of the failed section, and the limits of downstream flooding. Dam break modeling software was used to calibrate and verify the simulated flood-wave caused by the Bergeron Dam breach. Several scenarios were modeled, using different degrees of detail concerning the topography/channel-geometry of the affected areas. A sensitivity analysis of the important output parameters was completed. The relative importance of model parameters on the results was assessed against the background of observed historical events

  16. How big of an effect do small dams have? Using geomorphological footprints to quantify spatial impact of low-head dams and identify patterns of across-dam variation

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Costigan, Katie H.; Daniels, Melinda D.

    2015-01-01

    Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0–15.3 km) or 287 wetted widths (136–437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams.

  17. Decision Making Methodology to Mitigate Damage From Glacial Lake Outburst Floods From Imja Lake in Nepal

    Science.gov (United States)

    McKinney, D. C.; Cuellar, A. D.

    2015-12-01

    Climate change has accelerated glacial retreat in high altitude glaciated regions of Nepal leading to the growth and formation of glacier lakes. Glacial lake outburst floods (GLOF) are sudden events triggered by an earthquake, moraine failure or other shock that causes a sudden outflow of water. These floods are catastrophic because of their sudden onset, the difficulty predicting them, and enormous quantity of water and debris rapidly flooding downstream areas. Imja Lake in the Himalaya of Nepal has experienced accelerated growth since it first appeared in the 1960s. Communities threatened by a flood from Imja Lake have advocated for projects to adapt to the increasing threat of a GLOF. Nonetheless, discussions surrounding projects for Imja have not included a rigorous analysis of the potential consequences of a flood, probability of an event, or costs of mitigation projects in part because this information is unknown or uncertain. This work presents a demonstration of a decision making methodology developed to rationally analyze the risks posed by Imja Lake and the various adaptation projects proposed using available information. In this work the authors use decision analysis, data envelopement analysis (DEA), and sensitivity analysis to assess proposed adaptation measures that would mitigate damage in downstream communities from a GLOF. We use an existing hydrodynamic model of the at-risk area to determine how adaptation projects will affect downstream flooding and estimate fatalities using an empirical method developed for dam failures. The DEA methodology allows us to estimate the value of a statistical life implied by each project given the cost of the project and number of lives saved to determine which project is the most efficient. In contrast the decision analysis methodology requires fatalities to be assigned a cost but allows the inclusion of uncertainty in the decision making process. We compare the output of these two methodologies and determine the

  18. Delta /sup 13/C fractionation in Tarbela dam fish

    International Nuclear Information System (INIS)

    Latif, Z.; Sajjad, M.I.; Bilal, R.; Tasneem, M.A.; Khan, I.H.; Ali, M.

    1998-01-01

    The paper focuses on the study of naturally occurring /sup 13/C fractionation in Tarbela dam fish. Craig noted that gamma /sup 13/C values for animal tissues fall in the range as their food supply. DeNiro and Epstein demonstrated clearly that the carbon isotope composition of an animal greatly depends on its diet. The above mentioned statements were observed while studying the isotopic composition of carbon in different parts of the fish. Living fish was purchased from the Haripur side of the Tarbela lake. Different portions were separated and fish diet was collected from the fish stomach. Samples were dried in the oven at 40-50 deg. C for five days. Ground, homogenized and ignited with research grade oxygen at 900-1000 deg. C. CO and CO /sub 2/ were produced and CO was converted to CO/sub 2/ by circulation over CuO gauge furnace at 900 deg. C. CO/sub 2/ was purified using 70 deg. C slush and analyzed on Varian Mat (GD-150) mass spectrometer for gamma /sup 13/C measurements. The results show that fish flesh sup/13 C value is nearly similar to fish diet gamma /sup 13/C. gamma /sup 13/C values to different parts of the fish departed from that of the diet in the sequence: fish swim bladder (-22.04) >ribs (2-22.26)>skin (122.91)>diet (123.22)>flesh (-23.40)> vertebral column (-24.07). It is concluded that diet is easily metabolized in the fish flesh and skin tissues through blood streams without causing any pronounced fractionation. Fractionation was observed in the fish endo skeleton system due to which fish ribs become enriched in gamma /sup 13/C than vertebral column. Fractionation was also detected in visceral muscles (swim bladder) of the fish as comparison with somatic axial trunk muscle (fish flesh). (author)

  19. Potential impacts of damming the Juba Valley, western Somalia: Insights from geomorphology and alluvial history

    Science.gov (United States)

    Williams, Martin

    2014-05-01

    In 1988 plans were well advanced to dam the Juba River in western Somalia. The aims of the Baardheere Dam Project were to generate hydroelectric power for the capital Mogadishu, and to provide water for irrigation in the Juba Valley. A reconnaissance survey on foot along 500 km of the river upstream of the proposed dam site at Baardheere and detailed geomorphic mapping from air photos provided a basis for reconstructing the late Quaternary alluvial history of the river and for assessing the potential impact of the proposed dam. The Juba River rises in the Ethiopian Highlands and is the only river in Somalia that flows to the sea. Its history reflects climatic events in Ethiopia, where the Rift Valley lakes were very low during the LGM (21±2 ka), and high for about 5, 000 years before and after then. Cave deposits in Somalia indicate wetter conditions at 13, 10, 7.5 and 1.5 ka. Alluvial terraces in the Juba Valley range in age from late Pleistocene to late Holocene but only attain a few metres above the present floodplain. This is because the dry tributary valleys contain limestone caves and fissures that divert any high flows from the parent river underground, a process not known when the project was first approved. The oldest preserved terrace was cemented by calcrete by 40 ka. Alluvial gravels were deposited at the outlet of dry tributary valleys during times of episodic high-energy flow between 26 ka and 28 ka. Finely laminated shelly sands accumulated at 10 ka to form the 5 m terrace. The 2 m terrace was laid down 3.2 ka ago as a slackwater deposit. The lack of high-level alluvial terraces raises doubts over plans to dam the river, since rapid leakage would occur from side valleys and the reservoir would not attain the height needed to generate hydroelectric power. It would submerge all existing arable land along the river. Finally, the presence in the late Holocene alluvium of the sub-fossil gastropods Bulinus truncatus and Biomphalaria pfeifferi, which are

  20. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Barry; Evarts, Les [Confederated Salish and Kootenai Tribes

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research

  1. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Barry; Evarts, Les [Confederated Salish and Kootenai Tribes

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research

  2. As possíveis alterações microclimáticas devido a formação do lago artificial da hidrelétrica de Tucuruí -PA The possible impacts on the microclimate due to the artificial lake from Tucuruí's dam

    Directory of Open Access Journals (Sweden)

    Fabio Sanches

    2005-01-01

    Full Text Available Existem muitas preocupações ecológicas do impacto que a construção de grandes lagos na Amazônia podem provocar, principalmente relacionadas ao microclima. Este estudo visa aumentar o conhecimento científico sobre a distribuição de chuvas antes e depois da formação do lago artificial da UHE Tucuruí-PA. Foram utilizados dados diários de precipitação dos períodos de 1972 a 1983 (pré-enchimento e de 1984 a 1996 (pós-enchimento para as cidades de Tucuruí e Marabá-PA. Comparando-se os totais mensais (pré e pós-enchimento, não se observam diferenças estatisticamente significantes (foram aplicados os testes de Fisher e Man-Whitney. Analisando-se a ocorrência de dias com precipitação superior a 5 e 25 mm.dia-1, também não se observam diferenças estatisticamente significativas. Há um leve aumento do número de dias com chuvas leves no final período sêco após a formação do lago, talvez devido a alta evaporação do lago artificial. Também não se observou modificações do início ou final da estação chuvosa.There are a lot of ecological concern about the ecological impacts due to an artificial lake in Amazonia, especially related with the microclimate. This study aims to increase the scientific knowledge of the rainfall distribution prior and post flooding of the UHE Tucuruí-PA. Daily rainfall from 1972 until 1983 (prior inundation and from 1984 until 1996 (post inundation for Tucuruí and Marabá-PA. Comparing the monthly totals (prior and post, there is no statistical differences between the averages (using the statistical tests from Fisher and Man-Whitney. Analyzing the number of days with rainfall higher than 5 and 25 mm.day-1, there are also no statistical differences. It was observed a small increase of light rain during the end of the dry season. Also, the are no signal related to the modification of the onset or end from the rainy season.

  3. Geologic Hazards Associated With a Proposed Dam on the Yarlung-Tsangpo River in SE Tibet

    Science.gov (United States)

    Zeitler, P. K.; Meltzer, A. S.; Hallet, B.; Kidd, W. S.; Koons, P. O.

    2007-12-01

    For a decade anecdotes and media reports have been circulating about a proposed dam on the Yarlung- Tsangpo River in SE Tibet. The proposed site is in the deep canyon of the Yarlung-Tsangpo where the river leaves the Tibetan Plateau across an immense knickpoint, falling ~2000 m along an irregular U-shaped reach ~100 km in length. The fundamental purpose of the dam is generation of ~40,000 MW of hydropower, to be used in diverting a portion of the impounded river to water-starved regions of northern China. Offsetting benefits that would accrue from improved water supply in the north, debate has centered on the water-flow and sediment-flux impacts that would be felt downstream in the Brahmaputra system in northeastern India and Bangladesh, as well as the impact of a dam and large lake on the pristine, ecologically and ethnographically diverse area around the Yarlung-Tsangpo canyon, an area of great significance to Tibetan Buddhists. We have been examining the geodynamic evolution of eastern Tibet, and have gathered considerable geophysical and geological data on the knickpoint region. The knickpoint traverses the Namche Barwa-Gyala Peri massif, one of the most geologically active regions on Earth. In this region, very rapid bedrock exhumation at rates of 7 mm/yr or more has exposed granites as young as 1 Ma, and these rates have been ongoing for at least the past 3 m.y. Detrital-dating evidence shows that these high rates continue at present and that erosion within the massif contributes fully 50% of the suspended-sediment load in the Yarlung-Tsangpo at the point where it enters the Brahmaputra (this would be about 100 Mt/yr derived from the massif). The steep slopes in the massif fail by pervasive landsliding and suggest a steady-state topography where the high erosion rates are balanced by equivalent rates of rock uplift accommodated by numerous active structures. At a more regional scale, GPS results show that steep three-dimensional velocity gradients exist

  4. Towards a dams safety management system for Angola

    OpenAIRE

    Camilo, V.; Silva, A.; Costa, R.; Barateiro, J.; Portela, E. A.; Fonseca, J.

    2015-01-01

    Dams have contributed to the human development and have brought many benefits, such as delivering hydropower, irrigating agricultural fields, supplying drinking water, or just for navigational and recreational purposes. Nevertheless, dams are critical structures that raise multiple concerns and risks associated with the ecological, social and economic impact. Angola has a rich and complex network of water basins and dams that serves different strategic purposes as defined in it...

  5. Western Alaska ESI: LAKES (Lake Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains vector polygons representing lakes and land masses used in the creation of the Environmental Sensitivity Index (ESI) for Western Alaska. The...

  6. Isotope technique in JPS dam surveillance: its potential

    International Nuclear Information System (INIS)

    Sabri Hassan

    2006-01-01

    Controlling seepage is one of the most important requirements for safe dams. Any leakage at an earth embankment may be potentially dangerous since rapid internal erosion may quickly enlarge an initially minor defect. Thus dam owners need to have thorough surveillance programs that can forewarn of impending problems from seepage or other factors influencing the safety of dams. In carrying out dam surveillance works, all possible efforts should be considered and foreseeing the potential of isotope technique, JPS (Department of Irrigation and Drainage, Malaysia) and MINT (Malaysian Institute for Nuclear Technology Research) participated actively in the UNDP/RCA/IAEA program under RAS/8/093 project sponsored by the International Atomic Energy Agency (IAEA). Through these activities, it was noted that the technique demonstrated very promising potentials such as in assisting dam site selections, site investigations, watershed studies, dam and reservoir design, leakage investigations and sediments related issues, the two latter ones being relatively critical during the operational life of the dam. Establishment of baseline isotopic characteristics (or fingerprint), hydrochemistry, electrical conductivity and temperature profiles is underway for all JPS dams to be later utilized in diagnosing seepage related issues it is suggested that application of this technique be extended to other dam owners nationwide. (Author)

  7. Fish Passage Through Dams on the Upper Mississippi River

    National Research Council Canada - National Science Library

    Wilcox, Daniel

    1999-01-01

    .... I identified UMR migratory fish species, estimated current velocities through gate openings on UMR dams, compiled information on migration behavior, and estimated the swimming for north performance...

  8. Engineers find climbing techniques work well for dam inspections

    Energy Technology Data Exchange (ETDEWEB)

    O`Shea, M.; Graves, A. [Bureau of Reclamation, Denver, CO (United States)

    1996-10-01

    Climbing techniques adopted by the Bureau of Reclamation to inspect previously inaccessible or difficult to reach features at dams are described. Following the failure of the steel radial-arm gate at Folsom Dam, engineers mounted an effort to reach and inspect the dam`s seven other spillway gates. This close-up examination was performed to: (1) determine the condition of these gates; and (2) gather clues about the failure of the one gate. The access techniques described involved mountaineering techniques, as opposed to high scaling techniques, performed with dynamic and static nylon kermantle ropes.

  9. Detection of Water Leaks in Beni-Haroun Dam (Algeria)

    International Nuclear Information System (INIS)

    Hocini, N.; Mami, M.

    2011-01-01

    The main objective of this work was to detect water leakage origin combining conventional, tracing and isotope techniques. The investigation was performed by a research team from the 'Algiers Nuclear Research Centre' in collaboration with engineers from the 'National Agency for Dams'. The chemical and isotopic results have shown no influence of dam water on the water sampled at the piezometers and drains that are present in the close neighbourhood of the dam. However, the water flowing at drain D15 has exhibited the nearest quality to that dam. Dye tracing has shown a water circulation through complex pathways for the left bank. (author)

  10. MNR's role in public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, Jennifer [Ministry of Natural Resources, Peterborough, ON (Canada)

    2011-07-01

    The Ministry of Natural Resources (MNR) is the largest dam owner in Ontario with around 400 dams located all across the province. MNR works to exercise stewardship of Ontario's water resources in a context of public safety, employee safety and environmental awarenes. This presentation shows the different measures MNR implemented to reduce risks. Warning signs, safety booms, barrel buoys and pedestrian fencing have been installed around dams to alert the public to possible dangers. In addition, MNR employees receive training in how to inspect dams for safety concerns, how to identify problems which could result in hazards to the public and how to work safely.

  11. Environmental impacts of small dams on agriculture and ground water development: a case study of Khan pur Dam, Pakistan

    International Nuclear Information System (INIS)

    Ejaz, N.; Shahmim, M.A.; Elahi, A.; Khan, N.M.

    2012-01-01

    The water scarcity issues are increasing through out the world. Pakistan is also facing water crises and its water demands are increasing every day. During this research it is investigated that small dams are playing an important role for the sustainability of groundwater and agriculture. The main objective of this study was to assess the environmental impacts of small dam on agricultural and ground water. Proper planning and management of small dams may improve the sustainable agriculture in Pakistan. It is also concluded that small dams are significantly contributing towards economy, environment, local climate, recreational activities and crop production. Small dams can also be utilized for the production of electricity at local level. On the other hand, water management issues can be resolved by the involvement of local farmer's associations. Water losses through seepage, unlined channels and old irrigation methods are most critical in developing world. Considering the overall positive environmental impacts, construction of small dams must be promoted. (author)

  12. Improved water management with the development of Snake Lake Reservoir

    International Nuclear Information System (INIS)

    Kemp, P.; Miller, D.; Webber, J.

    1998-01-01

    The $10.3 million Snake Lake Reservoir which is located south of the TransCanada Highway between Bassano and Brooks, in Alberta, was completed in 1997. It provides 19.1 million cubic meters of storage to improve the water supply for the irrigation of 29,000 hectares of agricultural land in the Eastern Irrigation District. One of challenges that engineers faced during the construction of the reservoir was the extremely soft dam foundation conditions. The resolution of this and other challenges are discussed. In addition to water storage, the reservoir also provides wildlife, recreation and aquaculture opportunities. 8 refs., 5 figs

  13. Bathymetric map and area/capacity table for Castle Lake, Washington

    Science.gov (United States)

    Mosbrucker, Adam R.; Spicer, Kurt R.

    2017-11-14

    The May 18, 1980, eruption of Mount St. Helens produced a 2.5-cubic-kilometer debris avalanche that dammed South Fork Castle Creek, causing Castle Lake to form behind a 20-meter-tall blockage. Risk of a catastrophic breach of the newly impounded lake led to outlet channel stabilization work, aggressive monitoring programs, mapping efforts, and blockage stability studies. Despite relatively large uncertainty, early mapping efforts adequately supported several lake breakout models, but have limited applicability to current lake monitoring and hazard assessment. Here, we present the results of a bathymetric survey conducted in August 2012 with the purpose of (1) verifying previous volume estimates, (2) computing an area/capacity table, and (3) producing a bathymetric map. Our survey found seasonal lake volume ranges between 21.0 and 22.6 million cubic meters with a fundamental vertical accuracy representing 0.88 million cubic meters. Lake surface area ranges between 1.13 and 1.16 square kilometers. Relationships developed by our results allow the computation of lake volume from near real-time lake elevation measurements or from remotely sensed imagery.

  14. Reducing potential damages by freshet abatement in hydropower lakes. An argument for financing hydropower projects

    International Nuclear Information System (INIS)

    Ionescu, Stefan

    1996-01-01

    Dam reservoirs with significant water volumes (storage coefficients exceeding 8-10%) cause diminishing of the maximum flow downstream, especially due to the aleatory variation of the initial water level in the reservoir. Depending on the flow reduction in the dam, a methodology for determining the flow for the whole water course downstream is proposed, taking into account various potential combinations for flood generation in the catchment area. Differences between potential damages caused by floods in case of natural conditions versus those occurring in case of engineered zones result in important public financial benefits, amounting up to around 30% of the investments required for dam construction. For instance, in the case of hydropower lake Dragan on the Crisul Repede River the damages diminished down to about 50% for downstream watercourse. (authors)

  15. Pollution at Lake Mariut

    International Nuclear Information System (INIS)

    Nour ElDin, H.; Halim, S. N.; Shalby, E.

    2004-01-01

    Lake Mariut, south Alexandria, Egypt suffered in the recent decades from intensive pollution as a result of a continuous discharge of huge amounts of agriculture wastewater that contains a large concentration of the washed pesticides and fertilizers in addition to domestic and industrial untreated wastewater. The over flow from the lake is discharged directly to the sea through El-Max pumping station via EI-Umum drain. Lake Mariout is surrounded by a huge number of different industrial activities and also the desert road is cutting the lake, this means that a huge number of various pollutants cycle through the air and settle down in the lake, by the time and during different seasons these pollutants after accumulation and different chemical interactions will release again from the lake to the surrounding area affecting the surrounding zone

  16. Himalayan Lake- and River-Impacting Landslides and Ice Avalanches: Some So Deadly, Some No Problem

    Science.gov (United States)

    Kargel, J. S.; Karki, A.; Haritashya, U. K.; Shugar, D. H.; Harrison, S.

    2017-12-01

    the same area. Factors for landslide triggering of glacial lake outburst floods (GLOFs) include some of the same factors, but the mass/energy input rate into the lake, the lake's shape and length, and moraine dam properties are also important in GLOF triggering. Himalayan examples will illustrate some hazard factors.

  17. Mapping lake level changes using ICESat/GLAS satellite laser altimetry data: a case study in arid regions of central Asia

    Science.gov (United States)

    Li, JunLi; Fang, Hui; Yang, Liao

    2011-12-01

    Lakes in arid regions of Central Asia act as essential components of regional water cycles, providing sparse but valuable water resource for the fragile ecological environments and human lives. Lakes in Central Asia are sensitive to climate change and human activities, and great changes have been found since 1960s. Mapping and monitoring these inland lakes would improve our understanding of mechanism of lake dynamics and climatic impacts. ICESat/GLAS satellite laser altimetry provides an efficient tool of continuously measuring lake levels in these poorly surveyed remote areas. An automated mapping scheme of lake level changes is developed based on GLAS altimetry products, and the spatial and temporal characteristics of 9 typical lakes in Central Asia are analyzed to validate the level accuracies. The results show that ICESat/GLAS has a good performance of lake level monitoring, whose patterns of level changes are the same as those of field observation, and the max differences between GLAS and field data is 3cm. Based on the results, it is obvious that alpine lakes are increasing greatly in lake levels during 2003-2009 due to climate change, while open lakes with dams and plain endorheic lakes decrease dramatically in water levels due to human activities, which reveals the overexploitation of water resource in Central Asia.

  18. Quality of water in the White River and Lake Tapps, Pierce County, Washington, May-December 2010

    Science.gov (United States)

    Embrey, S.S.; Wagner, R.J.; Huffman, R.L.; Vanderpool-Kimura, A. M.; Foreman, J.R.

    2012-01-01

    The White River and Lake Tapps are part of a hydropower system completed in 1911–12. The system begins with a diversion dam on the White River that routes a portion of White River water into the southeastern end of Lake Tapps, which functioned as a storage reservoir for power generation. The stored water passed through the hydroelectric facilities at the northwestern end of the lake and returned to the White River through the powerhouse tailrace. Power generation ceased in January 2004, which altered the hydrology of the system by reducing volumes of water diverted out of the river, stored, and released through the powerhouse. This study conducted from May to December 2010 created a set of baseline data collected under a new flow regime for selected reaches of the White River, the White River Canal (Inflow), Lake Tapps Diversion (Tailrace) at the powerhouse, and Lake Tapps.

  19. Monitoring health in African dams : the Kamburu dam (Kenya) as a test case

    NARCIS (Netherlands)

    J.M.V. Oomen

    1981-01-01

    textabstractDams are among the obvious efforts to improve the economic situation in a developing country. They aim at using locally available natural resources. At present they are among the most popular means for promoting socio-economic development. A significant number of these programmes have

  20. Dam Design can Impede Adaptive Management of Environmental Flows: A Case Study from the Opuha Dam, New Zealand

    Science.gov (United States)

    Lessard, JoAnna; Murray Hicks, D.; Snelder, Ton H.; Arscott, David B.; Larned, Scott T.; Booker, Doug; Suren, Alastair M.

    2013-02-01

    The Opuha Dam was designed for water storage, hydropower, and to augment summer low flows. Following its commissioning in 1999, algal blooms (dominated first by Phormidium and later Didymosphenia geminata) downstream of the dam were attributed to the reduced frequency and magnitude of high-flow events. In this study, we used a 20-year monitoring dataset to quantify changes associated with the dam. We also studied the effectiveness of flushing flows to remove periphyton from the river bed. Following the completion of the dam, daily maximum flows downstream have exceeded 100 m3 s-1 only three times; two of these floods exceeded the pre-dam mean annual flood of 203 m3 s-1 (compared to 19 times >100 m3 s-1 and 6 times >203 m3 s-1 in the 8 years of record before the dam). Other changes downstream included increases in water temperature, bed armoring, frequency of algal blooms, and changes to the aquatic invertebrate community. Seven experimental flushing flows resulted in limited periphyton reductions. Flood wave attenuation, bed armoring, and a shortage of surface sand and gravel, likely limited the effectiveness of these moderate floods. Floods similar to pre-dam levels may be effective for control of periphyton downstream; however, flushing flows of that magnitude are not possible with the existing dam infrastructure. These results highlight the need for dams to be planned and built with the capacity to provide the natural range of flows for adaptive management, particularly high flows.